KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN DI LINGKUNGAN DITJEN CIPTA KARYA
STATUS : 29 JULI 2010
KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL CIPTA KARYA
REKAPITULASI LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010 DIREKTORAT JENDERAL CIPTA KARYA PAKET > RP 100 JUTA STATUS : 29 JULI 2010, JAM 08.00 WIB PAGU NO
NAMA SATUAN KERJA
RUPIAH MURNI
PLN
PAGU (Rp) TOTAL
SWAKELOLA + KONTRAKTUAL AP ≤ 100 JT
PAKET KONTRAK
KONTRAKTUAL > 100 JT RPM PHLN TOTAL
BLM
TOTAL
NON FISIK
FISIK TOTAL
JUMLAH PAKET DALAM PROSES PRA KONTRAK 1
2
3
4
5
6
7
8
9
10
NILAI KONTRAK (Rp. x 1.000)
1 Direktorat PAM
1,387,145,845
97,195,500
1,484,341,345
196,733,782
9,377,517
1,197,707,546
80,522,500
1,278,230,046
1,484,341,345
195
600
795
3
2
2
2
2
1
3
47
733
1,116,865,527
2 Direktorat PPLP
633,610,238
607,359,000
1,240,969,238
83,319,986
15,169,511
535,220,741
607,259,000
1,142,479,741
-
1,240,969,238
211
188
399
28
12
3
1
5
1
-
1
-
348
1,038,091,517
3 Direktorat Bangkim
899,323,660
24,000,000
923,323,660
87,359,847
31,515,239
780,448,574
24,000,000
804,448,574
-
923,323,660
163
532
695
21
2
-
-
21
-
11
1
6
633
452,261,725
4 Direktorat PBL
532,249,922
637,874,300
1,170,124,222
588,261,996
12,995,424
417,933,522
150,933,280
568,866,802
-
1,170,124,222
328
200
528
12
13
1
8
480
456,543,516
5 Direktorat Bina Program
540,942,532
148,471,500
689,414,032
517,450,606
1,058,900
68,866,506
102,038,020
170,904,526
-
689,414,032
110
2
112
2
95
141,264,367
78,441,953
490,143
35,334,407
1,000,000
36,334,407
14
16,244,090
6 Setditjen Cipta Karya
-
115,266,503
6
14
20
2
5
-
-
13 4
-
3 -
-
2
1 -
3 -
-
114,266,503
1,000,000
115,266,503
-
-
-
-
-
1,192,891,000
886,400,000
2,079,291,000
-
-
-
-
-
2,079,291,000
2,079,291,000
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-P2KP
817,891,000
61,800,000
879,691,000
-
-
-
-
-
879,691,000
879,691,000
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-PPIP
375,000,000
7 Pemberdayaan Masyarakat
2
-
150,000,000
525,000,000
-
-
-
-
-
525,000,000
525,000,000
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-PAMSIMAS
-
255,100,000
255,100,000
-
-
-
-
-
255,100,000
255,100,000
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-RISE
-
419,500,000
419,500,000
-
-
-
-
-
419,500,000
419,500,000
-
-
-
-
-
-
-
-
-
-
-
-
-
-
2,402,300,300
7,702,730,000
TOTAL
1 2 3 4 5 6 7 8 9 10
-
5,300,429,700
Keterangan : Penyiapan Dokumen Lelang Pengumuman Lelang/Prakualifikasi Penyusunan shortlist Undangan Pelelangan Penjelasan Pekerjaan Aanwyzing Pemasukan Penawaran Usulan Pemenang Penetapan Pemenang Penerbitan Surat Perintah Mulai Kerja Penandatangan Kontrak
1,551,568,170
70,606,734
3,035,511,296
965,752,800
4,001,264,096
2,079,291,000
7,702,730,000 1,013 1,536 2,549
66
22
23
4
41
6
13
10
61 2,303
3,221,270,742
RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010 DI LINGKUNGAN DITJEN CIPTA KARYA STATUS: 29 JULI 2010, 08.00 WIB NO.
URAIAN PERMASALAHAN
PAKET
TINDAK LANJUT
1 Persiapan Lelang
57
Percepatan Proses Lelang
2 Proses Lelang
179
Percepatan Proses Evaluasi Penawaran
3 Sanggah Banding
0
Dilakukan evaluasi ulang
4 Tender Ulang
0
Percepatan Proses Pelelangan
5 Review DED
0
Percepatan Review DED
6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran a. Loan belum efektif
10 4
Mengajukan pembukaan blokir
b. Menunggu Penandatanganan Loan Agreement
1
c. Tanggap Darurat
0
d. Revisi Kegiatan
4
e. Belum tersedia dokumen RPIJM
0
f. Menunggu persyaratan pembuktian BMN
1
7 Pemindahan Lokasi
0 TOTAL
246
Mempercepat proses revisi lokasi
KETERANGAN
DAFTAR PAKET BELUM LELANG TA.2010 DI LINGKUNGAN DITJEN CIPTA KARYA STATUS: 29 JULI 2010 NO.
DIREKTORAT
JUMLAH PAKET
NAMA PAKET BELUM LELANG
1 Dit. PAM
3
Pelaksanaan Pilot Project Corporate Social Responsibility (CSR) Bidang Air Minum Perbaikan Rumah Dinas (PKPAM Kalteng) Consultant For Bali Southtern Water Supply Project
2 Dit. PPLP
28
Pembangunan PS Sampah Terpadu 3R Kota Medan Pembangunan PS Sampah Terpadu 3R Kab. Asahan Supervisi Pembangunan PS Air Limbah Terpusat Kota Medan Pembangunan PS Sampah Terpadu 3R Kota Padang Pembangunan PS Sampah Terpadu 3R Kota Payakumbuh Pembangunan PS Sampah terpadu 3R (PPLP Sumsel) Pembangunan Prasarana Pengelolaan Sampah Terpadu 3R Kota tangerang Selatan Pembangunan Prasarana Pengelolaan sampah terpadu 3R Kab. Tangerang Pembangunan Prasarana Pengelolaan sampah Terpadu 3R Citra Gading Serang Pembangunan Prasarana Pengelolaan Sampah Terpadu 3R Sepang Serang Jakarta Urban Flood Management Project (JUFMP) Pembangunan Prasarana dan Sarana Sampah Terpadu 3R Kabupaten Garut Pembangunan Air Limbah Terpusat Skala Kawasan (RSH Tenjoresmi) Kabupaten Sukabumi Pembangunan Tempat Pengolahan Sampah Terpadu Kota Magelang Penyediaan PS Pengolah Sampah Kota Magelang Pembangunan Tempat Pengolahan Sampah Terpadu Kab Klaten
PERKIRAAN MULAI LELANG 16 Agustus 2010 Minggu II Agustus 2010 Lelang Tidak Dilaksanakan Minggu II Agustus 2010 Minggu II Agustus 2010 Awal September 2010 Minggu II Agustus 2010 Minggu II Agustus 2010 Minggu II Agustus 2010 Minggu II Agustus 2010 Minggu II Agustus 2010 Minggu II Agustus 2010 Minggu II Agustus 2010 Loan belum efektif Minggu II Agustus 2010 30 Juli 2010 Minggu II Agustus 2010 Minggu II Agustus 2010 Minggu II Agustus 2010
NO.
DIREKTORAT
JUMLAH PAKET
NAMA PAKET BELUM LELANG Penyediaan PS Pengolah Sampah Kab. Klaten Semarang Urban Drainage (Package C2: Semarang Pumping Station and Retarding Pond, Mechanical and Electrical Works) Pembangunan PS Air Limbah Terpusat Paket AL - 1
Minggu II Agustus 2010
Penyediaan Prasarana dan Sarana Pengolah Sampah Sistem 3R Kota Sanggau Kab. Sanggau
Minggu II Agustus 2010
Pembangunan PS Persampahan 3R Pupuan, kec. Pupuan Kab.Tabanan Pembangunan Pengelolaan Sampah Terpadu Skala Kawasan 3R di Besakih, Karangasem. Pembangunan Pengelolaan Sampah Terpadu Skala Kawasan (3R) di Tukad Mungga, Singaraja. Pengadaan Mobil Penyuluhan Kampanye dan Edukasi 3R Bidang PLP Pembangunan Pengelolaan Sampah Terpadu 3R Kab. Biak Pembangunan Pengelolaan Sampah Terpadu 3R Kab. Merauke 21
Minggu II Agustus 2010 Menunggu Persetujuan NOL JICA Awal September 2010
Penyediaan Prasarana dan Sarana Pengolah Sampah Sistem 3R Kota Entikong Kab. Sanggau
Pengembangan TPA Regional Mamminasata
3 Dit. Bangkim
PERKIRAAN MULAI LELANG
Pembangunan Rususnawa Lokasi Padang Pembangunan Rusunawa Lokasi Rempoa
Menunggu Proses Review Desain Minggu II Agustus 2010 Minggu II Agustus 2010 Minggu II Agustus 2010 Revisi DIPA ditolak DJA Minggu III Agustus 2010 Minggu III Agustus 2010 Akhir Juli 2010 Akhir Juli 2010
NO.
DIREKTORAT
JUMLAH PAKET
NAMA PAKET BELUM LELANG Pembangunan Rusunawa Lokasi Surabaya Perbaikan Rusunawa di Bandar Lampung Perbaikan Rusunawa di Bogor Perbaikan Rusunawa di Medan Perbaikan Rusunawa di Bandung Perbaikan Rusunawa di Sleman Perbaikan Rusunawa di Yogyakarta Perbaikan rusunawa di Cilacap Perbaikan Rusunawa di Sumsel Perbaikan Rusunawa di Bengkulu Perbaikan Rusunawa di Solo Perbaikan Rusunawa di Padang Pembangunan PSDdan Pengadaan Perlengkapan Sarana Gedung di Kws Rusunawa Kendari Sultra Pembuatan Sewage Treatmen Plant di Kws Rusunami Pulo Gebang Jakarta Timur Pembangunan PSD di Kws Rusunawa Bau-Bau Sultra Pembuatan MCK di Kws Kumuh Rel Kereta Api di Tanjung Priok Jakarta Utara Pembangunan PSD di Kws Rusunawa Pringwulung Condongcatur Kota Sleman Jogyakarta Pembangunan PSD di Kws Rusunawa Sidoarjo Ngelom Jawa Timur Pembangunan Jalan Poros Lokasi Kws.Membalong Kab.Belitung
PERKIRAAN MULAI LELANG Akhir Juli 2010 Awal Agustus 2010 Awal Agustus 2010 Awal Agustus 2010 Awal Agustus 2010 Awal Agustus 2010 Awal Agustus 2010 Awal Agustus 2010 Awal Agustus 2010 Awal Agustus 2010 Awal Agustus 2010 Awal Agustus 2010 Akhir Juli 2010 Akhir Juli 2010 Akhir Juli 2010 Akhir Juli 2010 Akhir Juli 2010 Akhir Juli 2010 Awal Agustus 2010
NO.
DIREKTORAT
4 Dit. PBL
JUMLAH NAMA PAKET BELUM LELANG PAKET 12 Supervisi Penataan dan Revitalisasi Kawasan Kota Pacitan Pelaksanaan Penataan dan Revitalisasi Kawasan Kota Pacitan Evaluation Consultant - Baseline ND Evaluation Consultant - Impact PAKET Evaluation Consultant - Kelembagaan BKM Indikator Pengukuran Kinerja Konsultan Evaluasi IDB PNPM 2 Good and Service Advance
PERKIRAAN MULAI LELANG Menunggu Arahan Menteri PU Menunggu Arahan Menteri PU Minggu I Oktober 2010 Minggu I Oktober 2010 Minggu I Oktober 2010 Minggu I Oktober 2010 21 Juli 2010 (belum update eMon) Menunggu Revisi DIPA 03 Agustus 2010
Lanjutan Revitalisasi Kompleks Perkantoran Cipta Karya Werdha Pura Sanur Bali Rehabilitasi Gedung Kantor Cipta Karya (Ruang Kerja Subdit PGRN) dan Rumah Dinas DUKUNGAN PSD KWS. TRADISIONAL KEL. KUTO PANJI KEC. BELINYU Penetapan Lokasi Diputuskan PENDAMPINGAN FISIK TRADISIONAL Bupati Bangka pada 4 Agustus DUKUNGAN PRASARANA DAN SARANA RUANG TERBUKA HIJAU KEL. SRI MENANTI KEC. 2010 SUNGAILIAT 5 Dit. Bina Program
TOTAL
2
66
Presentation Room Direktorat Bina Program LED and Business Plan
02 Agustus 2010 01 September 2010
DAFTAR PAKET PROSES LELANG TA.2010 DI LINGKUNGAN DITJEN CIPTA KARYA STATUS: 29 JULI 2010 NO.
DIREKTORAT
JUMLAH PAKET
NAMA PAKET PROSES LELANG
1 Dit. PAM
1
SPAM IKK Tanjungsiang (AM-Sbg-01) di Kec. Tanjungsiang Kab. Subang
2 Dit. Bina Program
10
TA. Program Development Advisory TA. Procurement/Safe Guard Specialist TA-MPA/PHAST and Sustainabality Specialist TA-CLTS Specialist TA-Advocacy Konsulltan NMC RIS-PNPM 2 Konsultan RMC (Lampung) RIS-PNPM 2 Konsulltan RMC (Sumatera Selatan) RIS-PNPM 2 Konsultan RMC (Jambi dan Riau) RIS-PNPM 2 Konsultan untuk Training Coach Team RIS-PNPM 2010
TOTAL
11
PERKIRAAN TERKONTRAK 05 Agustus 2010 Minggu II Agustus 2010 Minggu II Agustus 2010 Minggu II Agustus 2010 Minggu II Agustus 2010 Minggu II Agustus 2010 Minggu II Agustus 2010 Minggu II Agustus 2010 Minggu II Agustus 2010 Minggu II Agustus 2010 Minggu II Agustus 2010
REKAPITULASI LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010 DIREKTORAT JENDERAL CIPTA KARYA STATUS : 29 JULI 2010, JAM 08.00 WIB PAGU NO
NAMA SATUAN KERJA
RUPIAH MURNI
PLN
TOTAL
SWAKELOLA KONTRAKTUAL + AP ≤ 100 JT
PAGU (Rp) KONTRAKTUAL > 100 JT RPM PHLN TOTAL
PAGU TERKONTRAK BLM
TOTAL
RPM
PHLN
1,484,341,345
1,137,484,986
( x Rp. 1.000 ) SISA PAGU KONTRAK
NILAI KONTRAK TOTAL
RPM
PHLN
72,073,500
1,209,558,486
1,044,792,027
TOTAL
RPM
PHLN
72,073,500
1,116,865,527
92,692,959
-
TOTAL
1 Direktorat PAM
1,387,145,845
97,195,500
1,484,341,345
196,733,782
9,377,517
1,197,707,546
80,522,500
1,278,230,046
2 Direktorat PLP
633,610,238
607,359,000
1,240,969,238
83,319,986
15,169,511
535,220,741
607,259,000
1,142,479,741
-
1,240,969,238
502,139,403
598,259,000
1,100,398,403
439,833,097
598,258,420
1,038,091,517
62,306,306
580
62,306,886
3 Direktorat Bangkim
899,323,660
24,000,000
923,323,660
87,359,847
31,515,239
780,448,574
24,000,000
804,448,574
-
923,323,660
490,862,370
24,000,000
514,862,370
428,261,725
24,000,000
452,261,725
62,600,645
-
62,600,645
4 Direktorat PBL
532,249,922
637,874,300
1,170,124,222
588,261,996
12,995,424
417,933,522
150,933,280
568,866,802
-
1,170,124,222
357,011,397
128,544,905
485,556,302
327,998,611
128,544,905
456,543,516
29,012,786
-
29,012,786
5 Direktorat Bina Program
540,942,532
148,471,500
689,414,032
517,450,606
1,058,900
68,866,506
102,038,020
170,904,526
-
689,414,032
64,186,940
83,622,963
147,809,903
57,666,099
83,622,963
141,264,367
6,520,841
-
6,520,841
6 Setditjen
114,266,503
1,000,000
115,266,503
78,441,953
490,143
35,334,407
1,000,000
36,334,407
-
115,266,503
19,352,947
19,352,947
16,244,090
16,244,090
3,108,857
-
3,108,857
1,192,891,000
886,400,000
2,079,291,000
-
-
-
-
-
2,079,291,000
2,079,291,000
-
-
-
-
-
-
-
-
-
7 Pemberdayaan Masyarakat
-
-
-
92,692,959
-P2KP
817,891,000
61,800,000
879,691,000
-
-
-
-
-
879,691,000
879,691,000
-
-
-
-
-
-
-
-
-
-PPIP
375,000,000
150,000,000
525,000,000
-
-
-
-
-
525,000,000
525,000,000
-
-
-
-
-
-
-
-
-
-PAMSIMAS
-
255,100,000
255,100,000
-
-
-
-
-
255,100,000
255,100,000
-
-
-
-
-
-
-
-
-
-RISE
-
419,500,000
419,500,000
-
-
-
-
-
419,500,000
419,500,000
-
-
-
-
-
-
-
-
-
2,079,291,000
7,702,730,000
TOTAL
5,300,429,700
2,402,300,300
7,702,730,000 1,551,568,170
70,606,734
3,035,511,296
965,752,800
4,001,264,096
2,571,038,043
906,500,368
3,477,538,411
2,314,795,649
906,499,788
3,221,270,742 256,242,394
580 256,242,974
REKAPITULASI LAPORAN PELAKSANAAN BULANAN TA 2010 DIREKTORAT JENDERAL CIPTA KARYA STATUS : 29 JULI 2010, JAM 08.00 WIB ( x Rp. 1.000 ) RENCANA PENYERAPAN AKHIR BULAN JULI
PAGU NO
NAMA SATUAN KERJA RUPIAH MURNI
1 Direktorat Pengembangan Air Minum
PLN
TOTAL
KEUANGAN (RP)
REALISASI
DEVIASI
%
FISIK (%)
RUPIAH MURNI
PHLN
TOTAL
KEU.
FISIK
%
%
KEUANGAN (RP)
%
1,387,145,845
97,195,500
1,484,341,345
812,885,997
54.76
59.48
520,079,887
10,232,976
530,312,863
35.73
44.41
(282,573,134)
(19.04)
2 Direktorat Pengembangan PLP
633,610,238
607,359,000
1,240,969,238
590,341,362
47.57
51.55
191,110,692
236,329,906
427,440,598
34.44
35.11
(162,900,764)
(13.13)
3 Direktorat Pengembangan Permukiman
899,323,660
24,000,000
923,323,660
279,128,748
30.23
32.01
240,325,913
13,273,079
253,598,992
27.47
37.25
(25,529,756)
(2.76)
4 Direktorat Penataan Bangunan dan Lingkungan
532,249,922
637,874,300
1,170,124,222
464,526,030
39.70
60.00
150,898,753
227,378,362
378,277,115
32.33
36.33
(86,248,915)
(7.37)
5 Direktorat Bina Program
540,942,532
148,471,500
689,414,032
169,866,134
24.64
24.64
88,791,971
40,340,008
129,131,979
18.73
22.70
(40,734,155)
(5.91)
6 Sekretariat Jenderal Cipta Karya
114,266,503
1,000,000
115,266,503
62,193,118
53.96
55.96
45,840,133
-
45,840,133
39.77
40.87
(16,352,985)
(14.19)
1,192,891,000
886,400,000
2,079,291,000
754,592,000
36.29
34.90
121,867,450
234,897,859
356,765,309
17.16
13.22
(325,346,691)
(15.65)
-P2KP
817,891,000
61,800,000
879,691,000
284,380,000
32.33
32.33
121,867,450
14,780,000
136,647,450
15.53
6.10
(147,732,550)
(16.79)
-PPIP
375,000,000
150,000,000
525,000,000
219,600,000
41.83
36.31
-
-
-
-
-
(147,120,000)
(28.02)
7 Program Pemberdayaan Masyarakat
-PAMSIMAS
-
255,100,000
255,100,000
25,487,000
9.99
9.99
-
7,390,823
7,390,823
2.90
3.14
(18,096,177)
(7.09)
-RISE
-
419,500,000
419,500,000
225,125,000
53.67
53.67
-
212,727,036
212,727,036
50.71
50.85
(12,397,964)
(2.96)
2,402,300,300
7,702,730,000
3,133,533,388
40.68
45.18
1,358,914,799
762,452,190
2,121,366,989
27.54
30.41
(939,686,399)
(12.20)
Total
5,300,429,700
RENCANA DAN REALISASI PENYERAPAN DITJEN CIPTA KARYA TAHUN ANGGARAN 2010 9,000,000
8,000,000 7,702,730
7,702,720 7,184,918
7,000,000
6,538,451
DALAM JUTAAN RUPIAH
6,000,000
5,571,570
5,000,000 4,303,291
PAGU
4,000,000 RENCANA
3,133,533 3,000,000
REALISASI 2,121,673 2,121,367
2,000,000
1,690,926
1,244,885 702,454
1,000,000 -
308,139
1,458,874 1,127,995 837,038
660,025 452,196 271,230 46,845 211,344 3,947 7,89427,141 98,330 JAN FEB MAR APR MEI 28,907
132,054
JUN BULAN
JUL
AGT
SEP
OKT
NOP
DES
LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010 DIREKTORAT PENGEMBANGAN AIR MINUM PAKET > RP 100 JUTA STATUS : 29 JULI 2010, JAM 08.00 WIB NO
1 2
KODE NAMA SATUAN KERJA SATKER Satker Pusat 466178 Dit. PAM 448311 PSPAM IKK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
501380 494931 494993 495044 495364 495081 495260 495163 495302 495220 496055 495596 495684 495741 495817
Satker Propinsi Wilayah 1 PKPAM NAD PKPAM Sumut PKPAM Sumbar PKPAM Riau PKPAM Kepri PKPAM Jambi PKPAM Bengkulu PKPAM Sumsel PKPAM Babel PKPAM Lampung PKPAM Banten PKPAM Jawa Barat PKPAM Jawa Tengah PKPAM D.I.Y PKPAM Jawa Timur
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
495879 495920 495967 496002 496112 496752 496174 496240 466235 496313 496441 496539 496582 496369 496709 496642 496828
Wilayah 2 PKPAM Kalbar PKPAM Kalteng PKPAM Kalsel PKPAM Kaltim PKPAM Sulut PKPAM Gorontalo PKPAM Sulteng PKPAM Sulsel PKPAM Sulbar PKPAM Sultra PKPAM Bali PKPAM NTB PKPAM NTT PKPAM Maluku PKPAM Maluku Utara PKPAM Papua PKPAM Papua Barat TOTAL
1 2 3 4 5
Keterangan : Penyiapan Dokumen Lelang Pengumuman Lelang/Prakualifikasi Penyusunan shortlist Undangan Pelelangan Penjelasan Pekerjaan Aanwyzing
PAGU RUPIAH MURNI 159,190,845 57,090,845 102,100,000
PLN
PAGU (Rp) TOTAL
-
1,227,955,000 631,063,200 33,830,500 53,452,000 48,475,100 34,464,000 22,954,700 29,731,700 28,912,100 54,136,100 27,183,300 26,497,700 25,723,800 57,705,300 89,198,300 32,433,000 66,365,600
97,195,500 52,518,500
596,891,800 49,879,400 28,216,200 39,308,200 32,549,300 28,497,584 25,771,600 32,054,100 53,378,200 20,995,500 27,854,400 26,892,200 38,927,500 46,741,300 34,558,500 45,377,916 36,098,000 29,791,900
44,677,000
1,387,145,845
97,195,500
11,850,000 4,628,000
6,444,000
6,319,000 22,901,500 376,000
6,302,000
6,989,000 5,763,000 8,593,000
8,449,000 8,581,000
SWAKELOLA + KONTRAKTUAL AP ≤ 100 JT
159,190,845 57,090,845 102,100,000
38,081,350 33,194,936 4,886,414
1,325,150,500 683,581,700 33,830,500 53,452,000 60,325,100 39,092,000 22,954,700 29,731,700 28,912,100 60,580,100 27,183,300 26,497,700 25,723,800 64,024,300 112,099,800 32,433,000 66,741,600
158,652,432 87,573,061 1,134,550 2,365,300 14,036,538 7,067,585 1,524,500 1,116,050 1,579,460 14,815,779 1,629,435 1,614,090 3,392,600 12,205,122 20,835,977 2,153,475 2,102,600
9,377,517 7,463,462 653,050 260,000 480,000 189,400 610,050 215,920 40,422 723,218 400,000 679,202 2,970,256 241,944
1,076,598,051 552,123,677 32,042,900 51,086,700 35,258,562 26,916,415 21,240,800 28,005,600 27,116,720 45,723,899 24,830,647 24,483,610 21,651,998 51,819,178 67,552,067 30,279,525 64,115,056
641,568,800 49,879,400 28,216,200 45,610,200 32,549,300 28,497,584 32,760,600 37,817,100 61,971,200 20,995,500 27,854,400 35,341,200 38,927,500 55,322,300 34,558,500 45,377,916 36,098,000 29,791,900
71,079,371 1,875,400 1,153,770 8,874,300 2,062,330 1,885,473 4,893,290 8,400,700 9,194,045 4,543,188 1,995,975 1,960,557 1,617,500 9,774,300 3,370,234 4,876,109 1,505,600 3,096,600
1,914,055 63,780 20,000 900,000 349,425 50,000 181,000 310,000 39,850 -
1,484,341,345
196,733,782
9,377,517
6. Pemasukan Penawaran 7. Usulan Pemenang 8. Penetapan Pemenang 9. Penerbitan Surat Perintah Mulai Kerja 10. Penandatangan Kontrak
-
PAKET KONTRAK
KONTRAKTUAL > 100 JT RPM PHLN TOTAL 121,109,495 23,895,909 97,213,586
-
BLM
TOTAL
NON FISIK
FISIK TOTAL
121,109,495 23,895,909 97,213,586
-
159,190,845 57,090,845 102,100,000
24 20 4
16 3 13
40 23 17
80,522,500 36,421,500 10,770,000 4,628,000 20,741,500 282,000
1,157,120,551 588,545,177 32,042,900 51,086,700 46,028,562 31,544,415 21,240,800 28,005,600 27,116,720 45,723,899 24,830,647 24,483,610 21,651,998 51,819,178 88,293,567 30,279,525 64,397,056
-
1,325,150,500 683,581,700 33,830,500 53,452,000 60,325,100 39,092,000 22,954,700 29,731,700 28,912,100 60,580,100 27,183,300 26,497,700 25,723,800 64,024,300 112,099,800 32,433,000 66,741,600
171 80 5 6 9 1 5 3 5 4 5 2 4 5 9 5 12
584 366 10 30 16 10 12 11 17 10 11 8 19 14 89 30 79
755 446 15 36 25 11 17 14 22 14 16 10 23 19 98 35 91
524,474,374 48,004,000 26,998,650 31,009,900 30,486,970 26,612,111 20,858,310 23,653,400 43,284,155 16,452,312 25,509,000 24,881,643 37,129,000 36,657,000 31,188,266 40,501,807 34,552,550 26,695,300
44,101,000 5,726,000 6,989,000 5,763,000 8,593,000 8,449,000 8,581,000 -
568,575,374 48,004,000 26,998,650 36,735,900 30,486,970 26,612,111 27,847,310 29,416,400 51,877,155 16,452,312 25,509,000 33,330,643 37,129,000 45,238,000 31,188,266 40,501,807 34,552,550 26,695,300
-
641,568,800 49,879,400 28,216,200 45,610,200 32,549,300 28,497,584 32,760,600 37,817,100 61,971,200 20,995,500 27,854,400 35,341,200 38,927,500 55,322,300 34,558,500 45,377,916 36,098,000 29,791,900
91 5 4 4 10 2 3 12 3 6 3 11 4 11 2 5 4 2
218 27 15 9 7 12 5 8 19 6 14 10 5 14 24 17 14 12
309 32 19 13 17 14 8 20 22 12 17 21 9 25 26 22 18 14
1,197,707,546
80,522,500
1,278,230,046
-
1,484,341,345
195
600
795
JUMLAH PAKET DALAM PROSES PRA KONTRAK 1
2
3
4
5
6
7
8
9
-
-
-
-
-
-
-
1 1 -
1 1
2
1 1
2 2
1
1 1
-
-
2 2
2 2
1 1
3 3
1
10
47 40
1 1
1 2
1 3 1 2
-
-
-
-
1 -
2 26 8
-
-
7
1
1 4
-
2
1 3
2
2
-
2
2
1
3
47
NILAI KONTRAK (Rp. x 1.000)
38 21 17
114,489,181 19,066,650 95,422,531
695 395 15 36 21 9 17 14 22 13 14 10 23 16 69 35 81
1,002,376,346 496,494,331 29,262,418 49,785,083 38,877,739 29,102,905 20,052,016 26,276,327 26,465,298 43,823,832 20,985,685 23,883,442 20,782,555 38,316,109 60,064,996 20,856,546 47,959,380
300 32 17 9 17 14 6 20 22 12 17 20 9 25 26 22 18 14
505,882,015 46,583,863 24,762,250 22,918,990 29,990,971 22,439,099 23,972,790 26,731,170 45,165,353 15,721,141 25,443,363 19,740,764 31,513,615 42,564,773 29,121,915 39,364,620 33,722,658 26,124,680
733
1,116,865,527
RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010 DI LINGKUNGAN DIREKTORAT PENGEMBANGAN AIR MINUM STATUS: 29 JULI 2010 NO.
URAIAN PERMASALAHAN
PAKET
1 Persiapan Lelang
1
2 Proses Lelang
59
3 Sanggah Banding
0
4 Tender Ulang
0
5
0
Review DED
6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran a. Loan belum efektif
b. Menunggu Penandatanganan Loan Agreement c. Tanggap Darurat d. Revisi Kegiatan e. Belum tersedia dokumen RPIJM f. Menunggu persyaratan pembuktian BMN 7 Pemindahan Lokasi
Penetapan lokasi final
CSR
1
Diusulkan untuk direvisi DIPA untuk pengurangan pagu DIPA ke DJA melalui surat Dirjen CK.
Consultant For Bali Southtern Water Supply Project
1
Mempercepat proses pelepasan tanda bintang ke DJA.
Perbaikan Rumah Dinas
0 TOTAL
KETERANGAN
TINDAK LANJUT
62
PERMASALAHAN PAKET BELUM LELANG DIREKTORAT PENGEMBANGAN AIR MINUM STATUS : 29 JULI 2010
NO
SATKER/PROVINSI
JML PAKET BELUM LELANG
PAKET KONTRAK/RINCIAN KEGIATAN
1 DIREKTORAT PENGEMBANGAN AIR MINUM
1
1 Pelaksanaan Pilot Project Corporate Social Responsibility (CSR) Bidang Air Minum
2 PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM KALIMANTAN TENGAH
1
1 Perbaikan Rumah Dinas
3 PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM BALI
1
1 Consultant For Bali Southtern Water Supply Project
TOTAL
3
PAGU (X Rp.1000)
PENJELASAN BELUM LELANG
2,552,166 Persiapan lelang.
TINDAK LANJUT
Rencana pengumuman : 16 Agustus 2010. Rencana tanda tangan kontrak : 3 Nopember 2010.
Mempercepat proses 350,000 Belum dapat ditender karena masih terdapat tanda bintang pelepasan tanda bintang dikarenakan salah peruntukan dan ke DJA. sedang dalam proses revisi pelepasan tanda bintang ke DJA. 8,449,000 Loan belum efektif.
11,351,166
Diusulkan untuk direvisi DIPA untuk pengurangan pagu DIPA ke DJA melalui surat Dirjen CK.
LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010 DIREKTORAT PENGEMBANGAN AIR MINUM STATUS : 29 JULI 2010, JAM 08.00 WIB KODE NAMA SATUAN KERJA SATKER RUPIAH MURNI Satker Pusat
PLN
TOTAL
RPM
PHLN
TOTAL
RPM
PHLN
RPM
PHLN
TOTAL
-
121,109,495
159,190,845
117,729,254
-
117,729,254
114,489,181
114,489,181
3,240,073
-
3,240,073
33,194,936
-
23,895,909
23,895,909
57,090,845
20,515,668
-
20,515,668
19,066,650
19,066,650
1,449,018
-
1,449,018
102,100,000
-
102,100,000
4,886,414
-
97,213,586
97,213,586
102,100,000
97,213,586
97,213,586
95,422,531
95,422,531
1,791,055
-
1,791,055
1,227,955,000
97,195,500
1,325,150,500
158,652,432
9,377,517
1,076,598,051
80,522,500
1,157,120,551
-
1,325,150,500
1,019,755,732
72,073,500
1,091,829,232
930,302,846
72,073,500
1,002,376,346
89,452,886
-
89,452,886
631,063,200
52,518,500
683,581,700
87,573,061
7,463,462
552,123,677
36,421,500
588,545,177
-
683,581,700
508,284,738
36,421,500
544,706,238
460,072,831
36,421,500
496,494,331
48,211,907
-
48,211,907
501380 PKPAM NAD
33,830,500
-
33,830,500
1,134,550
653,050
32,042,900
-
32,042,900
-
33,830,500
32,042,900
32,042,900
29,262,418
29,262,418
2,780,482
-
2,780,482
494931 PKPAM Sumut
53,452,000
-
53,452,000
2,365,300
51,086,700
-
51,086,700
-
53,452,000
51,086,700
51,086,700
49,785,083
49,785,083
1,301,617
-
1,301,617
494993 PKPAM Sumbar
48,475,100
11,850,000
60,325,100
14,036,538
260,000
35,258,562
10,770,000
46,028,562
-
60,325,100
33,898,562
10,770,000
44,668,562
28,107,739
10,770,000
38,877,739
5,790,823
-
5,790,823
495044 PKPAM Riau
34,464,000
4,628,000
39,092,000
7,067,585
480,000
26,916,415
4,628,000
31,544,415
39,092,000
24,742,415
4,628,000
29,370,415
24,474,905
4,628,000
29,102,905
267,510
-
267,510
495364 PKPAM Kepri
22,954,700
-
22,954,700
1,524,500
189,400
21,240,800
-
21,240,800
-
22,954,700
21,240,800
21,240,800
20,052,016
20,052,016
1,188,784
-
1,188,784
495081 PKPAM Jambi
29,731,700
-
29,731,700
1,116,050
610,050
28,005,600
-
28,005,600
-
29,731,700
28,005,600
28,005,600
26,276,327
26,276,327
1,729,273
-
1,729,273
495260 PKPAM Bengkulu
28,912,100
-
28,912,100
1,579,460
215,920
27,116,720
-
27,116,720
-
28,912,100
27,116,720
27,116,720
26,465,298
26,465,298
651,422
-
651,422
495163 PKPAM Sumsel
54,136,100
6,444,000
60,580,100
14,815,779
40,422
45,723,899
-
45,723,899
-
60,580,100
44,323,899
44,323,899
43,823,832
43,823,832
500,067
-
500,067
495302 PKPAM Babel
27,183,300
-
27,183,300
1,629,435
723,218
24,830,647
-
24,830,647
-
27,183,300
22,155,814
22,155,814
20,985,685
20,985,685
1,170,129
-
1,170,129
495220 PKPAM Lampung
26,497,700
-
26,497,700
1,614,090
400,000
24,483,610
-
24,483,610
-
26,497,700
24,483,610
24,483,610
23,883,442
23,883,442
600,168
-
600,168
496055 PKPAM Banten
25,723,800
-
25,723,800
3,392,600
679,202
21,651,998
-
21,651,998
-
25,723,800
21,651,998
21,651,998
20,782,555
20,782,555
869,443
-
869,443
495596 PKPAM Jawa Barat
57,705,300
6,319,000
64,024,300
12,205,122
51,819,178
-
51,819,178
-
64,024,300
41,160,256
41,160,256
38,316,109
38,316,109
2,844,147
-
2,844,147
495684 PKPAM Jawa Tengah
89,198,300
22,901,500
112,099,800
20,835,977
88,293,567
-
112,099,800
54,967,327
75,708,827
39,323,496
60,064,996
15,643,831
-
15,643,831
495741 PKPAM D.I.Y
32,433,000
-
32,433,000
2,153,475
30,279,525
-
32,433,000
30,279,525
30,279,525
20,856,546
20,856,546
9,422,979
-
9,422,979
495817 PKPAM Jawa Timur
66,365,600
376,000
66,741,600
2,102,600
241,944
64,115,056
282,000
64,397,056
-
66,741,600
51,128,612
282,000
51,410,612
47,677,380
282,000
47,959,380
3,451,232
-
3,451,232
Wilayah 2
1,914,055
524,474,374
44,101,000
568,575,374
35,652,000
35,652,000
2,970,256 -
67,552,067 30,279,525
20,741,500 -
20,741,500
596,891,800
44,677,000
641,568,800
71,079,371
641,568,800
511,470,994
547,122,994
470,230,015
505,882,015
41,240,979
-
41,240,979
495879 PKPAM Kalbar
49,879,400
-
49,879,400
1,875,400
-
48,004,000
-
48,004,000
-
49,879,400
48,004,000
48,004,000
46,583,863
46,583,863
1,420,137
-
1,420,137
495920 PKPAM Kalteng
28,216,200
-
28,216,200
1,153,770
63,780
26,998,650
-
26,998,650
-
28,216,200
25,348,650
25,348,650
24,762,250
24,762,250
586,400
-
586,400
495967 PKPAM Kalsel
39,308,200
6,302,000
45,610,200
8,874,300
-
31,009,900
36,735,900
-
45,610,200
23,372,900
29,098,900
17,192,990
22,918,990
6,179,910
-
6,179,910
496002 PKPAM Kaltim
32,549,300
-
32,549,300
2,062,330
-
30,486,970
-
30,486,970
-
32,549,300
30,486,970
30,486,970
29,990,971
29,990,971
495,999
-
495,999
496112 PKPAM Sulut
28,497,584
-
28,497,584
1,885,473
-
26,612,111
-
26,612,111
-
28,497,584
26,612,111
26,612,111
22,439,099
22,439,099
4,173,012
-
4,173,012
496752 PKPAM Gorontalo
25,771,600
6,989,000
32,760,600
4,893,290
20,000
20,858,310
6,989,000
27,847,310
-
32,760,600
17,141,930
6,989,000
24,130,930
16,983,790
6,989,000
23,972,790
158,140
-
158,140
496174 PKPAM Sulteng
32,054,100
5,763,000
37,817,100
8,400,700
-
23,653,400
5,763,000
29,416,400
-
37,817,100
23,653,400
5,763,000
29,416,400
20,968,170
5,763,000
26,731,170
2,685,230
-
2,685,230
496240 PKPAM Sulsel
53,378,200
8,593,000
61,971,200
9,194,045
43,284,155
8,593,000
8,593,000
8,593,000
466235 PKPAM Sulbar
20,995,500
-
20,995,500
4,543,188
496313 PKPAM Sultra
27,854,400
-
27,854,400
1,995,975
496441 PKPAM Bali
26,892,200
8,449,000
35,341,200
496539 PKPAM NTB
38,927,500
-
496582 PKPAM NTT
46,741,300
8,581,000
496369 PKPAM Maluku
34,558,500
496709 PKPAM Maluku Utara
5,726,000
5,726,000
51,877,155
-
61,971,200
43,284,155
51,877,155
36,572,353
45,165,353
6,711,802
-
6,711,802
16,452,312
-
16,452,312
-
20,995,500
16,452,312
16,452,312
15,721,141
15,721,141
731,171
-
731,171
349,425
25,509,000
-
25,509,000
-
27,854,400
25,509,000
25,509,000
25,443,363
25,443,363
65,637
-
65,637
1,960,557
50,000
24,881,643
33,330,643
-
35,341,200
24,881,643
24,881,643
19,740,764
19,740,764
5,140,879
-
5,140,879
38,927,500
1,617,500
181,000
37,129,000
37,129,000
-
38,927,500
37,129,000
37,129,000
31,513,615
31,513,615
5,615,385
-
5,615,385
55,322,300
9,774,300
310,000
36,657,000
45,238,000
-
55,322,300
36,657,000
45,238,000
33,983,773
42,564,773
2,673,227
-
2,673,227
-
34,558,500
3,370,234
-
31,188,266
-
31,188,266
-
34,558,500
31,188,266
31,188,266
29,121,915
29,121,915
2,066,351
-
2,066,351
45,377,916
-
45,377,916
4,876,109
-
40,501,807
-
40,501,807
-
45,377,916
40,501,807
40,501,807
39,364,620
39,364,620
1,137,187
-
1,137,187
496642 PKPAM Papua
36,098,000
-
36,098,000
1,505,600
39,850
34,552,550
-
34,552,550
-
36,098,000
34,552,550
34,552,550
33,722,658
33,722,658
829,892
-
829,892
496828 PKPAM Papua Barat
29,791,900
-
29,791,900
3,096,600
-
26,695,300
-
26,695,300
-
29,791,900
26,695,300
26,695,300
26,124,680
26,124,680
570,620
-
570,620
1,387,145,845
97,195,500
1,484,341,345
196,733,782
1,484,341,345
1,137,484,986
1,209,558,486
1,044,792,027
1,116,865,527
92,692,959
-
92,692,959
TOTAL
900,000
5,726,000
-
20,741,500
-
TOTAL
38,081,350
-
-
TOTAL
57,090,845
Wilayah 1
121,109,495
BLM
( x Rp. 1.000 ) SISA PAGU KONTRAK
NILAI KONTRAK
159,190,845
Satker Propinsi
-
PAGU TERKONTRAK
-
448311 PSPAM IKK
-
SWAKELOLA + KONTRAKTUAL AP ≤ 100 JT
PAGU (Rp) KONTRAKTUAL > 100 JT RPM PHLN TOTAL
57,090,845
466178 Dit. PAM
159,190,845
PAGU
-
9,377,517
1,197,707,546
8,449,000 8,581,000
80,522,500
1,278,230,046
-
8,581,000
72,073,500
8,581,000
72,073,500
RENCANA PENYERAPAN DAN PROGRES KEUANGAN DIREKTORAT PENGEMBANGAN AIR MINUM STATUS : 29 JULI 2010, JAM 08.00 WIB ( X Rp. 1000 )
NO
KODE SATKER
PAGU NAMA SATUAN KERJA RUPIAH MURNI
Satker Pusat 1 466178 Direktorat Pengembangan Air Minum 2 448311 Pengembangan Sistem Penyediaan AM IKK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
501380 494931 494993 495044 495364 495081 495260 495163 495302 495220 496055 495596 495684 495741 495817
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
495879 495920 495967 496002 496112 496752 496174 496240 466235 496313 496441 496539 496582 496369 496709 496642 496828
RENCANA PENYERAPAN AKHIR BULAN JULI
159,190,845 57,090,845 102,100,000
PLN
TOTAL
-
Satker Propinsi Wilayah 1 Pengembangan Kinerja Pengelolaan AM NAD Pengembangan Kinerja Pengelolaan AM Sumut Pengembangan Kinerja Pengelolaan AM Sumbar Pengembangan Kinerja Pengelolaan AM Riau Pengembangan Kinerja Pengelolaan AM Kepri Pengembangan Kinerja Pengelolaan AM Jambi Pengembangan Kinerja Pengelolaan AM Bengkulu Pengembangan Kinerja Pengelolaan AM Sumsel Pengembangan Kinerja Pengelolaan AM Babel Pengembangan Kinerja Pengelolaan AM Lampung Pengembangan Kinerja Pengelolaan AM Banten Pengembangan Kinerja Pengelolaan AM Jawa Barat Pengembangan Kinerja Pengelolaan AM Jawa Tengah Pengembangan Kinerja Pengelolaan AM D.I.Y Pengembangan Kinerja Pengelolaan AM Jawa Timur
1,227,955,000 631,063,200 33,830,500 53,452,000 48,475,100 34,464,000 22,954,700 29,731,700 28,912,100 54,136,100 27,183,300 26,497,700 25,723,800 57,705,300 89,198,300 32,433,000 66,365,600
97,195,500 52,518,500
Wilayah 2 Pengembangan Kinerja Pengelolaan AM Kalbar Pengembangan Kinerja Pengelolaan AM Kalteng Pengembangan Kinerja Pengelolaan AM Kalsel Pengembangan Kinerja Pengelolaan AM Kaltim Pengembangan Kinerja Pengelolaan AM Sulut Pengembangan Kinerja Pengelolaan AM Gorontalo Pengembangan Kinerja Pengelolaan AM Sulteng Pengembangan Kinerja Pengelolaan AM Sulsel Pengembangan Kinerja Pengelolaan AM Sulbar Pengembangan Kinerja Pengelolaan AM Sultra Pengembangan Kinerja Pengelolaan AM Bali Pengembangan Kinerja Pengelolaan AM NTB Pengembangan Kinerja Pengelolaan AM NTT Pengembangan Kinerja Pengelolaan AM Maluku Pengembangan Kinerja Pengelolaan AM Maluku Utara Pengembangan Kinerja Pengelolaan AM Papua Pengembangan Kinerja Pengelolaan AM Papua Barat TOTAL
596,891,800 49,879,400 28,216,200 39,308,200 32,549,300 28,497,584 25,771,600 32,054,100 53,378,200 20,995,500 27,854,400 26,892,200 38,927,500 46,741,300 34,558,500 45,377,916 36,098,000 29,791,900 1,387,145,845
44,677,000
11,850,000 4,628,000
6,444,000
6,319,000 22,901,500 376,000
6,302,000
6,989,000 5,763,000 8,593,000
8,449,000 8,581,000
97,195,500
KEUANGAN (RP)
%
FISIK (%)
REALISASI RUPIAH MURNI
159,190,845 57,090,845 102,100,000
49,954,323 25,674,943 24,279,380
31.38 44.97 23.78
31.38 44.97 23.78
66,623,099 18,453,544 48,169,555
1,325,150,500 683,581,700 33,830,500 53,452,000 60,325,100 39,092,000 22,954,700 29,731,700 28,912,100 60,580,100 27,183,300 26,497,700 25,723,800 64,024,300 112,099,800 32,433,000 66,741,600
762,931,674 381,432,035 18,473,401 24,621,497 34,734,106 21,142,310 7,987,276 9,701,858 17,124,017 19,857,851 11,248,807 16,067,117 15,757,875 32,027,264 72,702,686 26,074,722 53,911,248
57.57 55.80 54.61 46.06 57.58 54.08 34.80 32.63 59.23 32.78 41.38 60.64 61.26 50.02 64.86 80.40 80.78
62.86 63.88 27.97 45.31 53.40 88.64 23.19 69.19 71.98 59.05 68.52 60.64 67.46 73.62 66.66 80.40 80.45
453,456,788 203,381,787 10,385,200 11,082,164 12,027,193 6,256,647 7,221,396 7,378,880 15,283,604 16,480,551 6,535,251 15,924,976 8,617,076 11,543,258 35,791,104 11,038,628 27,815,859
641,568,800 49,879,400 28,216,200 45,610,200 32,549,300 28,497,584 32,760,600 37,817,100 61,971,200 20,995,500 27,854,400 35,341,200 38,927,500 55,322,300 34,558,500 45,377,916 36,098,000 29,791,900 1,484,341,345
381,499,639 31,658,455 19,438,140 29,299,992 28,080,281 15,363,048 18,889,762 22,017,116 35,565,272 5,759,066 6,150,252 25,254,822 20,635,468 37,608,100 32,585,210 24,467,772 16,056,390 12,670,495 812,885,997
59.46 63.47 68.89 64.24 86.27 53.91 57.66 58.22 57.39 27.43 22.08 71.46 53.01 67.98 94.29 53.92 44.48 42.53 54.76
61.77 40.72 89.62 64.24 83.23 69.28 57.66 67.16 62.91 25.59 20.16 72.46 53.09 80.44 94.29 56.92 49.49 44.37 59.48
250,075,001 23,315,333 12,582,652 6,037,001 12,056,073 6,545,953 5,196,121 8,550,409 26,777,007 11,982,196 19,185,276 7,626,317 12,213,834 22,753,293 20,290,150 11,098,593 24,733,188 19,131,605 520,079,887
PHLN
DEVIASI
TOTAL
-
KEU.
FISIK
%
%
KEUANGAN (RP)
%
66,623,099 18,453,544 48,169,555
41.85 32.32 47.18
46.27 34.16 53.04
16,668,776 (7,221,399) 23,890,175
10.47 (12.65) 23.40
10,232,976 6,845,252 1,046,581 1,005,676 2,037,745 42,000 2,713,250 -
463,689,764 210,227,039 10,385,200 11,082,164 13,073,774 7,262,323 7,221,396 7,378,880 15,283,604 18,518,296 6,535,251 15,924,976 8,617,076 11,585,258 38,504,354 11,038,628 27,815,859
34.99 30.75 30.70 20.73 21.67 18.58 31.46 24.82 52.86 30.57 24.04 60.10 33.50 18.10 34.35 34.04 41.68
44.19 36.75 46.57 17.91 22.65 9.67 36.21 35.46 50.29 38.18 16.89 67.05 41.05 16.24 58.11 54.95 38.40
(299,241,910) (171,204,996) (8,088,201) (13,539,333) (21,660,332) (13,879,987) (765,880) (2,322,978) (1,840,413) (1,339,555) (4,713,556) (142,141) (7,140,799) (20,442,006) (34,198,332) (15,036,094) (26,095,389)
(22.58) (25.05) (23.91) (25.33) (35.91) (35.51) (3.34) (7.81) (6.37) (2.21) (17.34) (0.54) (27.76) (31.93) (30.51) (46.36) (39.10)
3,387,724 1,952,796 144,000 1,290,928 10,232,976
253,462,725 23,315,333 12,582,652 7,989,797 12,056,073 6,545,953 5,196,121 8,694,409 26,777,007 11,982,196 19,185,276 7,626,317 12,213,834 24,044,221 20,290,150 11,098,593 24,733,188 19,131,605 530,312,863
39.51 46.74 44.59 17.52 37.04 22.97 15.86 22.99 43.21 57.07 68.88 21.58 31.38 43.46 58.71 24.46 68.52 64.22 35.73
52.12 42.92 55.12 25.32 51.76 40.84 26.81 25.20 57.02 76.42 75.77 48.05 55.84 63.26 82.14 25.44 78.24 82.81 44.41
(128,036,914) (8,343,122) (6,855,488) (21,310,195) (16,024,208) (8,817,095) (13,693,641) (13,322,707) (8,788,265) 6,223,130 13,035,024 (17,628,505) (8,421,634) (13,563,879) (12,295,060) (13,369,179) 8,676,798 6,461,110 (282,573,134)
(19.96) (16.73) (24.30) (46.72) (49.23) (30.94) (41.80) (35.23) (14.18) 29.64 46.80 (49.88) (21.63) (24.52) (35.58) (29.46) 24.04 21.69 (19.04)
PERMASALAHAN DAN RENCANA TINDAK LANJUT PERCEPATAN PROGRES DIREKTORAT PENGEMBANGAN AIR MINUM STATUS 29 JULI 2010 No
Satker PKPAM
Progres Keu (%) Fisik (%)
Permasalahan
Tindak Lanjut
1. Provinsi Sumatera Utara
20.73
17.91
Terlambat dimulainya proses tender (baru bisa dimulai bulan April 2010) Percepatan pelaksanaan melalui : dikarenakan proses review DED & RAB yang disebabkan oleh : DED - Penarikan uang muka paling lambat yang disusun oleh Pemerintah Kabupaten/Kota perlu penyesuaian sampai dengan akhir bulan Juli 2010 dengan kondisi lapangan, masalah tanah yang mengakibatkan adanya diperkirakan senilai Rp 7.812.736.572,pergeseran penempatan sarana dan prtasarana yang akan dibangun. (15.90 %) Sehingga kontrak baru ditandatangani akhir bulan Juni 2010 dan awal - Pengadaan pipa diupayakan akan bulan Juli 2010. selesai seluruhnya pada akhir bulan Agustus 2010 sehingga progres fisik mencapai 61 % dan progres keuangan sebesar Rp 22.026.010.000,- (56.92 %).
2. Provinsi Sumatera Barat
21.67
22.65
Terdapat 2 paket kontrak (Bantek : FasilitasiPerencanaan Teknis Pengembangan SPAM dan Pembuatan Profil PDAM masih dalam tahap proses lelang
3. Provinsi Riau
18.58
9.67
Percepatan proses lelang dan diperkirakan sebelum tanggal 10 Agustus 2010 sudah tanda tangan kontrak
- Provinsi Riau termasuk yang harus melaksanakan pelelangan semi eproc plus berdasarkan Surat Edaran Menteri Pekerjaan Umum nomor : 12/SE/2009 tanggal 28 Desember 2009, sehingga proses pelelangan yang semula direncanakan akan dimulai pada bulan Januari 2010 terpaksa ditunda sampai dengan awal bulan Maret 2010 dikarenakan harus menunggu pelatihan semi e-proc yang dilaksanakan tanggal 23 25 Februari 2010 di Kota Batam
Percepatan pengiriman material oleh Penyedia Jasa IPA sehingga pada akhir Agustus 2010 diharapkan progres fisik mencapai 71 % dan realisasi keuangan mencapai Rp 16.492.914.000 (66.11 %). Hal ini juga memperhatikan kemungkinan adanya larangan penyebrangan Truk mengingat waktu Hari Raya Idul Fitri tanggal 11 September 2010
- Pembebasan tanah untuk lokasi IPA IKK Tampan terkendala karena pembebasan lahan dilakukan seluas 5 Ha (termasuk lokasi untuk IPA Pekanbaru Selatan), saat ini belum ada kesepakatan harga antara Tim Pengadaan Tanah Kab. Kampar, Tim Appraisal (Independen), dan pemilik lahan dimana Tim Appraisal memperkirakan Rp 40.000/M2 sementara pemilik lahan mengajukan penawaran Rp 70.000/M2
Kepala Dinas PU Provinsi Riau menjanjikan akan segera menyelesaikan masalah ini sehingga pada akhir bulan Juli 2010 lahan tersebut sudah dapat digunakan.
Ket
No
Satker PKPAM
4. Provinsi Jawa Barat
Progres Permasalahan Keu (%) Fisik (%) 18.1 16.24 1. Terlambat proses pelelangan sehingga kontrak baru ditandatangani bulan akhir Juni dan awal Juli 2010. Keterlambatan pada umumnya terjadi karena perlu dilakukan review desain khususnya review desain IPA Beton
2. Masih terdapat 2 paket kegiatan (dengan total nilai pagu sebesar Rp.6.973.922.000) yang belum tanda tangan kontrak yaitu: a) IKK Tanjung Siang Kab. Subang Pengumuman lelang terlambat karena ada perubahan lokasi dari IKK Sindang Barang Kab. Cianjur yang tidak jadi dilaksanakan karena DDUB dan kelembagaan pengelola tidak siap sampai batas waktu yang ditetapkan. b) Konsultan Supervisi UWSSP (Kota Bogor) Pengumuman lelang terlambat karena menyesuaikan dengan jadwal proses lelang paket kegiatan fisik yang dilaksanakan APBD Kota Bogor
5. Provinsi Kalimantan Selatan
17.52
25.32
Tindak Lanjut Asisten perencanaan agar melakukan review untuk persiapan TA 2011. Konsultan supervisi sekaligus mengerjakan review DED.
Memonitor proses lelang sesuai alokasi waktu. Status lelang: masa sanggah (akhir masa sanggah: 30/7/2010). Rencana tanda tangan kontrak: Kamis, 5-Agustus-2010 Memonitor proses lelang sesuai alokasi waktu. Status lelang: pembukaan dokumen biaya. Rencana tanda tangan kontrak: Minggu II Agustus 2010.
3. Revisi POK untuk perubahan lokasi
Percepatan proses revisi POK. Status: sudah masuk ke Dit. Bina Program.
4. Revisi DIPA untuk pelatihan fasilitator PAMSIMAS
Percepatan proses revisi DIPA. Status: sudah masuk ke Dit. Bina Program
Paket Fisik: - Paket fisik (Pengadaan IPA Paket 20 l/dtk di lokasi Tanah Bumbu), tanda tangan kontrak pada tanggal 29 Juli 2010 dan penarikan uang muka senilai Rp 626 juta baru diproses. - Pake fisik (Pengadaan dan pemasangan pipa di lokasi Martapura Barat senilai Rp 1,050 M dari pagu Rp 1,5 M) baru tanda tangan kontrak tanggal 26 Juli 2010. Jaminan pelaksanaan telah selesai namun uang muka sedang proses. - Pake fisik (pekerjaan rehabilitasi sumur dalam senilai Rp 975 juta dari pagu Rp 1 M belum menarik uang muka. - Paket fisik (pekerjaan pembuatan SPAM air gambut senilai Rp 2,480 M dari pagu Rp 3,19 M belum menarik uang muka
Penarikan uang muka sebesar Rp 626 juta akan selesai pada tanggal 1 Agustus 2010 Proses jaminan pelaksanaan selesai tanggal 31 Juli 2010 sebesar 800 juta
Penarikan uang muka sebesar Rp 195 juta pada tanggal 5 Agustus 2010 Penarikan uang muka sebesar Rp 496 juta pada tanggal 5 Agustus 2010
Ket
No
Satker PKPAM
Progres Keu (%) Fisik (%)
Permasalahan - Pake fisik (Pengadaan dan pemasangan pipa di lokasi Banjar Baru, RSH senilai Rp 1,050 M dari pagu Rp 1,5 M) baru tanda tangan kontrak tanggal 26 Juni 2010. Kontraktor belum mengambil uang muka
Penarikan uang muka sebesar Rp 210 juta pada tanggal 5 Agustus 2010
- Pake fisik (Pengadaan dan pemasangan pipa di lokasi Martapura Barat senilai Rp .... M dari pagu Rp 5,197 M) baru tanda tangan kontrak tanggal 26 Juli 2010. Kontraktor belum mengambil uang muka.
Penarikan uang muka sebesar Rp 210 juta pada tanggal 5 Agustus 2010
Paket Konsultan: - 2 paket Konsultan (Rencana Induk dan Air Baku) masih pada tahap masa sanggah.
Kegiatan PAMSIMAS : Kotabaru : - DIPA Satker PPIP TA 2009 tidak cukup untuk membiayai tahap III untuk 3 desa sebesar Rp. 77 juta x 3 desa = Rp. 220 juta, sehingga dana sebesar Rp 220 juta tersebut akan dibayarkan pada TA 2010, dengan syarat harus dibuat kontrak baru dan cara pembayarannya harus dilakukan dalam 3 tahap. Akibat dari luncuran tahun 2009 ini adalah target kegiatan Pamsimas TA 2010 akan berkurang 3 desa.
Kab. Tanah Bumbu - DIPA Satker PPIP TA 2009 tidak cukup untuk membiayai tahap II dan III untuk 3 desa sebesar Rp.154 juta x 3 desa = Rp. 462 juta, sehingga dana sebesar Rp 462 juta tersebut akan dibayarkan pada TA 2010, dengan syarat harus dibuat kontrak baru dan cara pembayarannya harus dilakukan dalam 3 tahap. Akibat dari luncuran tahun 2009 ini adalah target kegiatan Pamsimas TA 2010 akan berkurang 3 desa.
6. Provinsi Gorontalo
15.86
26.81
Tindak Lanjut
Paket Fisik: Paket fisik (Pengadaan dan pemasangan IPA Paket dan pipa 5 l/dtk di lokasi desa Manano) senilai Rp 3,184 M dari pagu Rp 3,31 M baru tanda tangan kontrak pada tanggal 21 Juli 2010 akibat adanya tender ulang.
Masa sanggah selesai tanggal 30 Juli 2010 dan tanda tangan kontrak tanggal 4 Agustus 2010. Uang muka akan ditarik pada tanggal 9 Agustus sebesar Rp. 140 juta.
Pencairan tahap III untuk 3 desa pada TA 2009 tsb akan diselesaikan pada akhir bulan 9 Agustus 2010 (kesepakatan dengan KPPN). Satker PPIP harus memproses tambahan pagu dana TA 2010 untuk 3 desa sebesar 220 juta
Pencairan tahap II dan III untuk 3 desa pada TA 2009 tsb akan diselesaikan pada akhir bulan 9 Agustus 2010 (kesepakatan dengan KPPN). Satker PPIP harus memproses tambahan pagu dana TA 2010 untuk 3 desa sebesar 462 juta
Penambahan tenaga kerja dan jam kerja sampai jam 8. Sehingga pada akhir Agustus progres akan mencapai fisik 7.14 % , keuangan 20 %
Ket
No
Satker PKPAM
Progres Keu (%) Fisik (%)
Permasalahan
Tindak Lanjut
Paket Konsultan: Paket Konsultan (Pendampingan Rencana Induk SPAM senilai Rp 361 juta dari pagu Rp 400 juta) baru tanda tangan kontrak pada tanggal 21 Juli 2010 karena adanya tender ulang.
Laporan pendahuluan akan diselesaikan tanggal 28 Agustus 2010 sehingga pada tanggal 30 Agustus bisa mengadakan penarikan termin pertama sebesar 20% (Rp 72,2 juta)
Kegiatan PAMSIMAS : Progres fisik Paket PMAC baru mencapai 35% dan belum ada progres keuangan karena terdapat kesalahan pada nomer register loan dan saat ini sedang proses revisi di ditjen anggaran Kementerian Keuangan.
7.
Provinsi Bali
21.58
48.05
Revisi PAMSIMAS diperkirakan selesai tanggal 18 Agustus 2010 sehingga pada tanggal 30 Agustus bisa mencairkan dana sebesar Rp 4 M.
- Kegiatan konsultan penyusunan DED Southterm Bali Water Suply project dengan pagu sebesar Rp 8,449 M belum bisa ditenderkan karena "Loan JICA' untuk Southterm Bali Water Suply project belum ditandatangi (rencana penandatanganan tanggal 31 Maret 2011). Bobot kegiatan ini adalah sebesar 23,9 % dari pagu anggaran.
Kegiatan tersebut diusulkan direvisi dihilangkan dari DIPA .Surat usulan revisi DIPA dari Satker PK PAM Bali telah diserahkan pada tgl 5 juli 2010. Rekomendasi revisi dari Ditpam tanggal 30 Juli 2010, diharapkan revisi DIPA bisa disetujui oleh kementerian Keuangan pada tanggal 30 Agustus 2010
- Terdapat sisa lelang dari paket kontraktual sebesar Rp.5,03 M dengan bobot 14,20%.
-
Sisa dana itu diusulkan untuk dimanfaatkan dengan revisi POK. Usulan revisi dari Satker Bali direncanakan tanggal 2 Agustus 2010 dan diharapkan disetujui tanggal 15 Agustus 2010. Persiapan proses prakontrak sudah dilaksanakan.
-
Tanggal 13 Agustus diperkirakan akan menyerap dana sebesar Rp 0,803 M. Sehingga tanggal 31 Agustus progres fisik 100 % dan keuangan 95 %
Paket fisik (Banpro Penyehatan PDAM Kab. Bangli senilai Rp 0,698 M dari pagu Rp 1,071 M) yang tanda tangan kontrak tanggal 1 Juni 2010. Progres saat ini fisik 73% dan keuangan 20%.
Paket fisik (Banpro Penyehatan PDAM Kab.Jembrana senilai Rp 1,198 M dari pagu Rp 1,508 M) yang tanda tangan kontrak tanggal 1 Juni 2010. Progres saat ini fisik 65% dan keuangan 20%.
Tanggal 13 Agustus diperkirakan akan menyerap dana sebesar Rp 0,803 M. Sehingga diperkirakan tanggal 31 Agustus progres fisik 100 % dan keuangan 95 %
Ket
No
Satker PKPAM
Progres Keu (%) Fisik (%)
Permasalahan
Tindak Lanjut
Paket fisik (Pembangunan SPAM desa rawan air Desa Sibetan Kab.Karang Asem senilai Rp 3,211 M dari pagu Rp 4,953 M) yang tanda tangan kontrak tanggal 1 Juni 2010. Progres saat ini fisik 55% dan keuangan 20%.
Tanggal 13 Agustus diperkirakan akan menyerap dana sebesar Rp 1.79 M. Sehingga diperkirakan tanggal 31 Agustus progres fisik 80% dan keuangan 76 %
Paket fisik (Pembangunan SPAM kumuh nelayan Candi Dasan Kab.Karang Asem senilai Rp 1,658 M dari pagu Rp 2,448 M) yang tanda tangan kontrak tanggal 1 Juni 2010. Progres saat ini fisik 50% dan keuangan 20%.
Tanggal 13 Agustus diperkirakan akan menyerap dana sebesar Rp 1.01 M. Sehingga diperkirakan tanggal 31 Agustus progres fisik 90% dan keuangan 81 %
Paket fisik (Pembangunan SPAM Desa Kurikub Kab.Gianyar senilai Rp 1,15 M dari pagu Rp 1,49 M) yang tanda tangan kontrak tanggal 20 Mei 2010. Progres saat ini fisik 50 % dan keuangan 20%.
Tanggal 13 Agustus diperkirakan akan menyerap dana sebesar Rp 0,4025 M. Sehingga diperkirakan tanggal 31 Agustus progres fisik 65% dan keuangan 55 %
Paket fisik (Pembangunan SPAM desa Brangblang Kab.Jembrana senilai Rp 2,27 M dari pagu Rp 3,028 M) yang tanda tangan kontrak tanggal 20 Mei 2010. Progres saat ini fisik 50% dan keuangan 20%.
Tanggal 13 Agustus diperkirakan akan menyerap dana sebesar Rp0,7945 M. Sehingga diperkirakan tanggal 31 Agustus progres fisik 65% dan keuangan 55 %
Ket
RENCANA DAN REALISASI PENYERAPAN DIREKTORAT PENGEMBANGAN AIR MINUM TAHUN ANGGARAN 2010 1,600,000
1,484,341
1,484,331 1,420,536
1,400,000
1,344,747
1,193,059 1,200,000
DALAM JUTAAN RUPIAH
998,101 1,000,000 812,886 800,000
PAGU RENCANA
589,536
600,000
530,313 414,142
428,836 371,781
400,000 242,805 200,000
102,244 -
-
15,311
REALISASI
295,147 240,874 178,722
45,064
85,623 52,260 46,640 12,541 22,693 27.90 JAN FEB MAR APR MEI
JUN BULAN
JUL
AGT
SEP
OKT
NOP
DES
LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010 DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN PAKET > RP 100 JUTA STATUS : 29 JULI 2010, JAM 08.00 WIB NO
KODE SATKER
PAGU NAMA SATUAN KERJA
1
a. Satker Pusat 466190 Direktorat PPLP
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
b. 494880 494956 495007 495050 495370 495090 495276 495188 495311 495239 496061 448333 495616 495704 495750 495832 495885 495936 495973 496018 496137 496761 496180 496262 466229 496322 496472 496545 496591 496375 496715 496658 496834
Satker Propinsi PPLP NAD PPLP Sumatera Utara PPLP Sumatera Barat PPLP Riau PPLP Kepulauan Riau PPLP Jambi PPLP Bengkulu PPLP Sumatera Selatan PPLP Bangka Belitung PPLP Lampung PPLP Banten PPLP DKI PPLP Jawa Barat PPLP Jawa Tengah PPLP DIY PPLP Jawa Timur PPLP Kalimantan Barat PPLP Kalimantan Tengah PPLP Kalimantan Selatan PPLP KalimantanTimur PPLP Sulawesi Utara PPLP Gorontalo PPLP Sulawesi Tengah PPLP Sulawesi Selatan PPLP Sulawesi Barat PPLP Sulawesi Tenggara PPLP Bali PPLP NTB PPLP NTT PPLP Maluku PPLP Maluku Utara PPLP Papua PPLP Papua Barat TOTAL
1 2 3 4 5
Keterangan : Penyiapan Dokumen Lelang Pengumuman Lelang/Prakualifikasi Penyusunan shortlist Undangan Pelelangan Penjelasan Pekerjaan Aanwyzing
RUPIAH MURNI
PLN
PAGU (Rp) TOTAL
SWAKELOLA + KONTRAKTUAL AP ≤ 100 JT
PAKET KONTRAK
KONTRAKTUAL > 100 JT RPM PHLN TOTAL
BLM
TOTAL
NON FISIK
FISIK TOTAL
JUMLAH PAKET DALAM PROSES PRA KONTRAK 1
2
69,247,123 69,247,123
22,000,000 22,000,000
91,247,123 91,247,123
19,766,468 19,766,468
100,000 100,000
49,380,655 49,380,655
22,000,000 22,000,000
71,380,655 71,380,655
-
91,247,123 91,247,123
27 27
2 2
29 29
564,363,115 13,180,232 17,315,451 26,759,831 11,016,721 9,373,631 9,605,750 9,920,452 16,391,415 12,242,231 8,115,231 11,881,531 12,206,900 43,445,475 30,229,431 7,768,731 92,339,350 8,803,031 9,941,831 29,526,031 17,229,931 12,762,231 7,281,975 6,851,231 20,079,599 7,103,059 7,912,331 42,213,562 20,465,131 10,762,531 9,942,631 7,147,231 7,180,031 7,368,385
585,359,000 385,388,200 2,000,000 1,000,000 40,000,000 2,000,000 1,000,000 153,970,800 -
1,149,722,115 398,568,432 19,315,451 26,759,831 11,016,721 9,373,631 9,605,750 9,920,452 16,391,415 12,242,231 8,115,231 11,881,531 13,206,900 43,445,475 70,229,431 9,768,731 92,339,350 8,803,031 9,941,831 29,526,031 17,229,931 12,762,231 7,281,975 6,851,231 21,079,599 7,103,059 7,912,331 196,184,362 20,465,131 10,762,531 9,942,631 7,147,231 7,180,031 7,368,385
63,553,518 3,410,220 1,817,851 4,164,711 1,127,588 1,141,704 1,183,895 1,296,007 3,782,515 1,478,756 1,158,246 1,608,836 704,900 1,486,475 5,103,531 1,124,931 2,690,825 1,277,449 1,329,516 3,432,626 1,492,906 1,027,791 1,181,975 1,304,185 3,269,611 1,068,519 1,207,406 3,980,728 4,028,681 1,232,096 1,215,856 977,231 918,456 1,327,495
15,069,511 292,900 400,000 814,000 739,155 300,000 1,125,930 280,000 385,000 500,000 740,000 357,850 274,500 500,000 1,426,900 1,100,000 299,250 200,000 787,310 400,000 300,000 100,000 1,654,201 539,800 747,560 100,000 177,000 233,000 200,000 95,155
485,840,086 9,577,112 15,097,600 21,781,120 9,149,978 7,931,927 7,295,925 8,344,445 12,223,900 10,263,475 6,216,985 9,914,845 11,227,500 41,459,000 23,699,000 6,643,800 88,548,525 7,226,332 8,412,315 25,306,095 15,337,025 11,434,440 6,100,000 5,447,046 15,155,787 5,494,740 5,957,365 38,132,834 16,259,450 9,297,435 8,726,775 5,970,000 6,261,575 5,945,735
585,259,000 385,288,200 2,000,000 1,000,000 40,000,000 2,000,000 1,000,000 153,970,800 -
1,071,099,086 394,865,312 17,097,600 21,781,120 9,149,978 7,931,927 7,295,925 8,344,445 12,223,900 10,263,475 6,216,985 9,914,845 12,227,500 41,459,000 63,699,000 8,643,800 88,548,525 7,226,332 8,412,315 25,306,095 15,337,025 11,434,440 6,100,000 5,447,046 16,155,787 5,494,740 5,957,365 192,103,634 16,259,450 9,297,435 8,726,775 5,970,000 6,261,575 5,945,735
-
1,149,722,115 398,568,432 19,315,451 26,759,831 11,016,721 9,373,631 9,605,750 9,920,452 16,391,415 12,242,231 8,115,231 11,881,531 13,206,900 43,445,475 70,229,431 9,768,731 92,339,350 8,803,031 9,941,831 29,526,031 17,229,931 12,762,231 7,281,975 6,851,231 21,079,599 7,103,059 7,912,331 196,184,362 20,465,131 10,762,531 9,942,631 7,147,231 7,180,031 7,368,385
184 14 4 4 1 7 4 4 4 9 5 9 11 4 7 3 9 4 5 8 7 2 8 1 7 1 3 16 6 3 6 2 3 3
186 11 8 10 5 2 2 4 4 4 5 6 3 6 14 5 15 4 4 8 3 3 3 3 12 3 6 9 5 4 6 3 3 3
370 25 12 14 6 9 6 8 8 13 10 15 14 10 21 8 24 8 9 16 10 5 11 4 19 4 9 25 11 7 12 5 6 6
28
633,610,238
607,359,000
1,240,969,238
83,319,986
15,169,511
535,220,741
607,259,000
1,142,479,741
-
1,240,969,238
211
188
399
28
6 7 8 9 10
Pemasukan Penawaran Usulan Pemenang Penetapan Pemenang Penerbitan Surat Perintah Mulai Kerja Penandatangan Kontrak
-
1 1 11
3
4
-
-
3 1
3 2
5
6 1 1
1
4
1 1 -
8
9
-
-
-
26 26
57,197,615 57,197,615
-
322 24 8 12 5 9 6 7 7 13 10 11 13 8 16 7 18 6 9 15 10 5 6 4 16 4 9 20 11 7 12 4 4 6
980,893,902 394,237,486 14,401,787 19,586,504 4,713,617 7,069,111 6,674,557 7,735,400 11,564,476 9,812,973 6,127,263 8,120,891 9,114,788 30,532,901 54,572,105 5,910,141 66,941,881 6,621,542 8,235,957 22,800,839 13,593,929 10,920,770 3,912,950 4,235,006 13,956,473 5,337,147 5,900,253 182,011,724 12,457,422 8,374,334 8,558,031 5,703,240 5,243,757 5,914,647
-
348
1,038,091,517
-
1
1 1
1 1
4 1 2 5 1 6 2 1
1 1
2
2
2
3
2
1 2
12
3
1
5
1
-
1
10
NILAI KONTRAK (Rp. x 1.000)
7
RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010 DI LINGKUNGAN DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN STATUS: 29 JULI 2010 NO.
URAIAN PERMASALAHAN
JUMLAH PAKET
1 Persiapan Lelang
23
2 Proses Lelang
23
3 Sanggah Banding
-
4 Tender Ulang
-
5 Review DED
-
6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran a. Loan belum efektif
3
TINDAK LANJUT
21 paket 3R (pemberdayaan), sedang penyusunan RAB; 1 paket IPAL RSH (pemberdayaan)
1. Sumatera Utara: Supervisi Pembangunan PS Air Limbah Terpusat Kota Medan 2. DKI Jakarta: Jakarta Urban Flood Management Project (JUFMP) 3. Sulawesi Selatan: Pengembangan TPA Regional Mamminasata
b. Menunggu Penandatanganan Loan Agreement c. Tanggap Darurat d. Revisi Kegiatan e. Belum tersedia dokumen RPIJM f. Menunggu persyaratan pembuktian BMN
7 Pemindahan Lokasi
1 1
TOTAL
51
KETERANGAN
1. DI Yogyakarta: Pembangunan PS Air Limbah Terpusat (MSMHP)
1. Maluku Utara: Pengadaan Mobil Penyuluhan Kampanye dan Edukasi 3R Bidang PLP
PERMASALAHAN DAN TINDAK LANJUT PAKET BELUM LELANG TA. 2010 DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN STATUS: 29 JULI 2010 NO
SATKER/PROVINSI
JML PAKET BELUM LELANG
1
PPLP SUMATERA UTARA
3
2
PPLP SUMATERA BARAT
2
PAKET KONTRAK
PAGU (X Rp.1000)
PENJELASAN BELUM LELANG
TINDAK LANJUT
KETERANGAN
1. Pembangunan PS Sampah Terpadu 3R Kota Medan
204,300 Proses pemberdayaan masih berlangsung dan menunggu hasil rencana dari konsultan perencanaan
Pemberdayaan
2. Pembangunan PS Sampah Terpadu 3R Kab. Asahan
204,300 Proses pemberdayaan masih berlangsung dan menunggu hasil rencana dari konsultan perencanaan
Pemberdayaan
3. Supervisi Pembangunan PS Air Limbah Terpusat Kota Medan
109,600 Loan belum efektif
1. Pembangunan PS Sampah Terpadu 3R Kota Padang
200,000 Proses pemberdayaan masih berlangsung dan menunggu hasil rencana dari konsultan perencanaan
Pemberdayaan
2. Pembangunan PS Sampah Terpadu 3R Kota Payakumbuh
200,000 Proses pemberdayaan masih berlangsung dan menunggu hasil rencana dari konsultan perencanaan
Pemberdayaan
3
PPLP SUMATERA SELATAN
1
1. Pembangunan PS Sampah terpadu 3R
500,000 Proses pemberdayaan masih berlangsung dan menunggu hasil rencana dari konsultan perencanaan
Pemberdayaan
4
PPLP BANTEN
4
1. Pembangunan Prasarana Pengelolaan Sampah Terpadu 3R Kota tangerang Selatan
400,000 Proses pemberdayaan masih berlangsung dan menunggu hasil rencana dari konsultan perencanaan
Pemberdayaan
2. Pembangunan Prasarana Pengelolaan sampah terpadu 3R Kab. Tangerang
400,000 Proses pemberdayaan masih berlangsung dan menunggu hasil rencana dari konsultan perencanaan
Pemberdayaan
3. Pembangunan Prasarana Pengelolaan sampah Terpadu 3R Citra Gading Serang
400,000 Proses pemberdayaan masih berlangsung dan menunggu hasil rencana dari konsultan perencanaan
Pemberdayaan
4. Pembangunan Prasarana Pengelolaan Sampah Terpadu 3R Sepang Serang
400,000 Proses pemberdayaan masih berlangsung dan menunggu hasil rencana dari konsultan perencanaan
Pemberdayaan
NO
SATKER/PROVINSI
JML PAKET BELUM LELANG
5
PPLP DKI JAKARTA
1
1. Jakarta Urban Flood Management Project (JUFMP)
1,000,000 Loan belum efektif: Kelengkapan perencanaan (termasuk dokumen AMDAL) belum selesai
6
PPLP JAWA BARAT
2
1. Pembangunan Air Limbah Terpusat Skala Kawasan (RSH Tenjoresmi) Kabupaten Sukabumi
1,029,000
7
PPLP JAWA TENGAH
5
PAKET KONTRAK
PAGU (X Rp.1000)
PENJELASAN BELUM LELANG
TINDAK LANJUT
KETERANGAN
Pemberdayaan
2. Pembangunan Prasarana dan Sarana Sampah Terpadu 3R Kabupaten Garut
450,000 Proses pemberdayaan masih berlangsung dan menunggu hasil rencana dari konsultan perencanaan
Pemberdayaan
1. Pembangunan Tempat Pengolahan Sampah Terpadu Kota Magelang
130,000 Proses pemberdayaan masih berlangsung dan menunggu hasil rencana dari konsultan perencanaan
Pemberdayaan
2. Penyediaan PS Pengolah Sampah Kota Magelang
120,000 Proses pemberdayaan masih berlangsung dan menunggu hasil rencana dari konsultan perencanaan
Pemberdayaan
3. Pembangunan Tempat Pengolahan Sampah Terpadu Kab Klaten
130,000 Proses pemberdayaan masih berlangsung dan menunggu hasil rencana dari konsultan perencanaan
Pemberdayaan
4. Penyediaan PS Pengolah Sampah Kab. Klaten
120,000 Proses pemberdayaan masih berlangsung dan menunggu hasil rencana dari konsultan perencanaan
Pemberdayaan
5. Semarang Urban Drainage (Package C2: Semarang Pumping Station and Retarding Pond, Mechanical and Electrical Works)
1,000,000 Menunggu persetujuan JICA
2,000,000 Loan Agreement belum efektif
8
PPLP D.I. YOGYAKARTA
1
1. Pembangunan PS Air Limbah Terpusat Paket AL - 1
9
PPLP KALIMANTAN BARAT
2
1. Penyediaan Prasarana dan Sarana Pengolah Sampah Sistem 3R Kota Entikong Kab. Sanggau
248,380 Proses pemberdayaan masih berlangsung dan menunggu hasil rencana dari konsultan perencanaan
Pemberdayaan
2. Penyediaan Prasarana dan Sarana Pengolah Sampah Sistem 3R Kota Sanggau Kab. Sanggau
248,380 Proses pemberdayaan masih berlangsung dan menunggu hasil rencana dari konsultan perencanaan
Pemberdayaan
10
PPLP SULAWESI SELATAN
1
1. Pengembangan TPA Regional Mamminasata
Persiapan pemaketan pelelangan
1,000,000 Tanda tangan Loan Agreement pada Mempercepat proses lelang akhir Maret 2010. Rencana Pengumuman Lelang/Prakualifikasi pada tanggal 5 Juli 2010
NO
SATKER/PROVINSI
JML PAKET BELUM LELANG
11
PPLP BALI
3
PAKET KONTRAK
PAGU (X Rp.1000)
PENJELASAN BELUM LELANG
TINDAK LANJUT
KETERANGAN
1. Pembangunan PS Persampahan 3R Pupuan, kec. Pupuan Kab.Tabanan
200,000 Proses pemberdayaan masih berlangsung dan menunggu hasil rencana dari konsultan perencanaan
Pemberdayaan
2. Pembangunan Pengelolaan Sampah Terpadu Skala Kawasan 3R di Besakih, Karangasem.
500,000 Proses pemberdayaan masih berlangsung dan menunggu hasil rencana dari konsultan perencanaan
Pemberdayaan
3. Pembangunan Pengelolaan Sampah Terpadu Skala Kawasan (3R) di Tukad Mungga, Singaraja.
200,000 Proses pemberdayaan masih berlangsung dan menunggu hasil rencana dari konsultan perencanaan
Pemberdayaan
12
PPLP MALUKU UTARA
1
1. Pengadaan Mobil Penyuluhan Kampanye dan Edukasi 3R Bidang PLP
250,000 Bintang pada DIPA
13
PPLP PAPUA
2
1. Pembangunan Pengelolaan Sampah Terpadu 3R Kab. Biak
416,800 Proses pemberdayaan masih berlangsung dan menunggu hasil rencana dari konsultan perencanaan
Pemberdayaan
2. Pembangunan Pengelolaan Sampah Terpadu 3R Kab. Merauke
476,800 Proses pemberdayaan masih berlangsung dan menunggu hasil rencana dari konsultan perencanaan
Pemberdayaan
TOTAL
28
12,537,560
Revisi DIPA
Revisi DIPA ditolak DJA
LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010 DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN STATUS : 29 JULI 2010, JAM 08.00 WIB PAGU
NO
KODE SATKER
1
466190
Satker Pusat Direktorat PPLP
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
494880 494956 495007 495050 495370 495090 495276 495188 495311 495239 496061 448333 495616 495704 495750 495832 495885 495936 495973 496018 496137 496761 496180 496262 466229 496322 496472 496545 496591 496375 496715 496658 496834
Satker Propinsi PPLP NAD PPLP Sumatera Utara PPLP Sumatera Barat PPLP Riau PPLP Kepulauan Riau PPLP Jambi PPLP Bengkulu PPLP Sumatera Selatan PPLP Bangka Belitung PPLP Lampung PPLP Banten PPLP DKI PPLP Jawa Barat PPLP Jawa Tengah PPLP DIY PPLP Jawa Timur PPLP Kalimantan Barat PPLP Kalimantan Tengah PPLP Kalimantan Selatan PPLP KalimantanTimur PPLP Sulawesi Utara PPLP Gorontalo PPLP Sulawesi Tengah PPLP Sulawesi Selatan PPLP Sulawesi Barat PPLP Sulawesi Tenggara PPLP Bali PPLP NTB PPLP NTT PPLP Maluku PPLP Maluku Utara PPLP Papua PPLP Papua Barat
NAMA SATUAN KERJA
TOTAL
RUPIAH MURNI
PLN
TOTAL
SWAKELOLA + AP
KONTRAKTUAL ≤ 100 JT
PAGU (Rp) KONTRAKTUAL > 100 JT RPM PHLN TOTAL
PAGU TERKONTRAK BLM
TOTAL
RPM
( x Rp. 1.000 ) SISA PAGU KONTRAK
NILAI KONTRAK
PHLN
TOTAL
RPM
PHLN
TOTAL
RPM
PHLN
TOTAL
69,247,123 69,247,123
22,000,000 22,000,000
91,247,123 91,247,123
19,766,468 19,766,468
100,000 100,000
49,380,655 49,380,655
22,000,000 22,000,000
71,380,655 71,380,655
-
91,247,123 91,247,123
47,280,655 47,280,655
20,000,000 20,000,000
67,280,655 67,280,655
37,197,615 37,197,615
20,000,000 20,000,000
57,197,615 57,197,615
10,083,040 10,083,040
-
10,083,040 10,083,040
564,363,115 13,180,232 17,315,451 26,759,831 11,016,721 9,373,631 9,605,750 9,920,452 16,391,415 12,242,231 8,115,231 11,881,531 12,206,900 43,445,475 30,229,431 7,768,731 92,339,350 8,803,031 9,941,831 29,526,031 17,229,931 12,762,231 7,281,975 6,851,231 20,079,599 7,103,059 7,912,331 42,213,562 20,465,131 10,762,531 9,942,631 7,147,231 7,180,031 7,368,385
585,359,000 385,388,200 2,000,000 1,000,000 40,000,000 2,000,000 1,000,000 153,970,800 -
1,149,722,115 398,568,432 19,315,451 26,759,831 11,016,721 9,373,631 9,605,750 9,920,452 16,391,415 12,242,231 8,115,231 11,881,531 13,206,900 43,445,475 70,229,431 9,768,731 92,339,350 8,803,031 9,941,831 29,526,031 17,229,931 12,762,231 7,281,975 6,851,231 21,079,599 7,103,059 7,912,331 196,184,362 20,465,131 10,762,531 9,942,631 7,147,231 7,180,031 7,368,385
63,553,518 3,410,220 1,817,851 4,164,711 1,127,588 1,141,704 1,183,895 1,296,007 3,782,515 1,478,756 1,158,246 1,608,836 704,900 1,486,475 5,103,531 1,124,931 2,690,825 1,277,449 1,329,516 3,432,626 1,492,906 1,027,791 1,181,975 1,304,185 3,269,611 1,068,519 1,207,406 3,980,728 4,028,681 1,232,096 1,215,856 977,231 918,456 1,327,495
15,069,511 292,900 400,000 814,000 739,155 300,000 1,125,930 280,000 385,000 500,000 740,000 357,850 274,500 500,000 1,426,900 1,100,000 299,250 200,000 787,310 400,000 300,000 100,000 1,654,201 539,800 747,560 100,000 177,000 233,000 200,000 95,155
485,840,086 9,577,112 15,097,600 21,781,120 9,149,978 7,931,927 7,295,925 8,344,445 12,223,900 10,263,475 6,216,985 9,914,845 11,227,500 41,459,000 23,699,000 6,643,800 88,548,525 7,226,332 8,412,315 25,306,095 15,337,025 11,434,440 6,100,000 5,447,046 15,155,787 5,494,740 5,957,365 38,132,834 16,259,450 9,297,435 8,726,775 5,970,000 6,261,575 5,945,735
585,259,000 385,288,200 2,000,000 1,000,000 40,000,000 2,000,000 1,000,000 153,970,800 -
1,071,099,086 394,865,312 17,097,600 21,781,120 9,149,978 7,931,927 7,295,925 8,344,445 12,223,900 10,263,475 6,216,985 9,914,845 12,227,500 41,459,000 63,699,000 8,643,800 88,548,525 7,226,332 8,412,315 25,306,095 15,337,025 11,434,440 6,100,000 5,447,046 16,155,787 5,494,740 5,957,365 192,103,634 16,259,450 9,297,435 8,726,775 5,970,000 6,261,575 5,945,735
-
1,149,722,115 398,568,432 19,315,451 26,759,831 11,016,721 9,373,631 9,605,750 9,920,452 16,391,415 12,242,231 8,115,231 11,881,531 13,206,900 43,445,475 70,229,431 9,768,731 92,339,350 8,803,031 9,941,831 29,526,031 17,229,931 12,762,231 7,281,975 6,851,231 21,079,599 7,103,059 7,912,331 196,184,362 20,465,131 10,762,531 9,942,631 7,147,231 7,180,031 7,368,385
454,858,748 9,342,112 14,689,000 21,381,120 5,247,000 7,931,927 7,295,925 7,944,445 11,723,900 10,263,475 6,216,985 8,314,845 11,227,500 39,980,000 23,199,000 6,643,800 79,548,525 6,729,572 8,412,315 25,010,695 15,337,025 11,434,440 4,580,000 5,447,046 14,755,787 5,494,740 5,957,365 29,432,834 16,259,450 9,297,435 8,726,775 5,720,000 5,367,975 5,945,735
578,259,000 385,288,200 39,000,000 153,970,800 -
1,033,117,748 394,630,312 14,689,000 21,381,120 5,247,000 7,931,927 7,295,925 7,944,445 11,723,900 10,263,475 6,216,985 8,314,845 11,227,500 39,980,000 62,199,000 6,643,800 79,548,525 6,729,572 8,412,315 25,010,695 15,337,025 11,434,440 4,580,000 5,447,046 14,755,787 5,494,740 5,957,365 183,403,634 16,259,450 9,297,435 8,726,775 5,720,000 5,367,975 5,945,735
402,635,482 8,949,866 14,401,787 19,586,504 4,713,617 7,069,111 6,674,557 7,735,400 11,564,476 9,812,973 6,127,263 8,120,891 9,114,788 30,532,901 15,572,105 5,910,141 66,941,881 6,621,542 8,235,957 22,800,839 13,593,929 10,920,770 3,912,950 4,235,006 13,956,473 5,337,147 5,900,253 28,040,924 12,457,422 8,374,334 8,558,031 5,703,240 5,243,757 5,914,647
578,258,420 385,287,620 39,000,000 153,970,800 -
980,893,902 394,237,486 14,401,787 19,586,504 4,713,617 7,069,111 6,674,557 7,735,400 11,564,476 9,812,973 6,127,263 8,120,891 9,114,788 30,532,901 54,572,105 5,910,141 66,941,881 6,621,542 8,235,957 22,800,839 13,593,929 10,920,770 3,912,950 4,235,006 13,956,473 5,337,147 5,900,253 182,011,724 12,457,422 8,374,334 8,558,031 5,703,240 5,243,757 5,914,647
52,223,266 392,246 287,213 1,794,616 533,383 862,816 621,368 209,045 159,424 450,502 89,722 193,954 2,112,712 9,447,099 7,626,895 733,659 12,606,644 108,030 176,358 2,209,856 1,743,096 513,670 667,050 1,212,040 799,314 157,593 57,112 1,391,910 3,802,028 923,101 168,744 16,760 124,218 31,088
580 580 -
52,223,846 392,826 287,213 1,794,616 533,383 862,816 621,368 209,045 159,424 450,502 89,722 193,954 2,112,712 9,447,099 7,626,895 733,659 12,606,644 108,030 176,358 2,209,856 1,743,096 513,670 667,050 1,212,040 799,314 157,593 57,112 1,391,910 3,802,028 923,101 168,744 16,760 124,218 31,088
633,610,238
607,359,000
1,240,969,238
83,319,986
15,169,511
535,220,741
607,259,000
1,142,479,741
-
1,240,969,238
502,139,403
598,259,000
1,100,398,403
439,833,097
598,258,420
1,038,091,517
62,306,306
580
62,306,886
RENCANA PENYERAPAN DAN PROGRES KEUANGAN DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN STATUS : 29 JULI 2010, JAM 08.00 WIB ( X Rp. 1000 )
KODE NO SATKER
RENCANA PENYERAPAN AKHIR BULAN JULI
PAGU NAMA SATUAN KERJA RUPIAH MURNI
1
Satker Pusat 466190 Direktorat Pengembangan Penyehatan Lingkungan Permukiman
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
494880 494956 495007 495050 495370 495090 495276 495188 495311 495239 496061 448333 495616 495704 495750 495832 495885 495936 495973 496018 496137 496761 496180 496262 466229 496322 496472 496545 496591 496375 496715 496658 496834
Satker Propinsi Pengembangan PLP NAD Pengembangan PLP Sumatera Utara Pengembangan PLP Sumatera Barat Pengembangan PLP Riau Pengembangan PLP Kepulauan Riau Pengembangan PLP Jambi Pengembangan PLP Bengkulu Pengembangan PLP Sumatera Selatan Pengembangan PLP Bangka Belitung Pengembangan PLP Lampung Pengembangan PLP Banten Pengembangan PLP DKI Pengembangan PLP Jawa Barat Pengembangan PLP Jawa Tengah Pengembangan PLP DIY Pengembangan PLP Jawa Timur Pengembangan PLP Kalimantan Barat Pengembangan PLP Kalimantan Tengah Pengembangan PLP Kalimantan Selatan Pengembangan PLP KalimantanTimur Pengembangan PLP Sulawesi Utara Pengembangan PLP Gorontalo Pengembangan PLP Sulawesi Tengah Pengembangan PLP Sulawesi Selatan Pengembangan PLP Sulawesi Barat Pengembangan PLP Sulawesi Tenggara Pengembangan PLP Bali Pengembangan PLP NTB Pengembangan PLP NTT Pengembangan PLP Maluku Pengembangan PLP Maluku Utara Pengembangan PLP Papua Pengembangan PLP Papua Barat TOTAL
PLN
TOTAL
KEUANGAN (RP)
%
FISIK (%)
REALISASI RUPIAH MURNI
PHLN
DEVIASI
TOTAL
KEU.
FISIK
%
%
KEUANGAN (RP)
%
69,247,123 69,247,123
22,000,000 22,000,000
91,247,123 91,247,123
33,811,730 33,811,730
37.06 37.06
40.56 40.56
11,097,699 11,097,699
3,011,365 3,011,365
14,109,064 14,109,064
15.46 15.46
24.00 24.00
(19,702,666) (19,702,666)
(21.59) (21.59)
564,363,115 13,180,232 17,315,451 26,759,831 11,016,721 9,373,631 9,605,750 9,920,452 16,391,415 12,242,231 8,115,231 11,881,531 12,206,900 43,445,475 30,229,431 7,768,731 92,339,350 8,803,031 9,941,831 29,526,031 17,229,931 12,762,231 7,281,975 6,851,231 20,079,599 7,103,059 7,912,331 42,213,562 20,465,131 10,762,531 9,942,631 7,147,231 7,180,031 7,368,385 633,610,238
585,359,000 385,388,200 2,000,000 1,000,000 40,000,000 2,000,000 1,000,000 153,970,800 607,359,000
1,149,722,115 398,568,432 19,315,451 26,759,831 11,016,721 9,373,631 9,605,750 9,920,452 16,391,415 12,242,231 8,115,231 11,881,531 13,206,900 43,445,475 70,229,431 9,768,731 92,339,350 8,803,031 9,941,831 29,526,031 17,229,931 12,762,231 7,281,975 6,851,231 21,079,599 7,103,059 7,912,331 196,184,362 20,465,131 10,762,531 9,942,631 7,147,231 7,180,031 7,368,385 1,240,969,238
556,529,632 173,327,803 7,015,197 9,935,303 4,030,433 3,442,131 3,577,532 3,644,095 6,196,904 4,469,353 2,998,072 5,504,744 7,362,949 22,751,147 38,686,004 6,087,990 64,296,129 6,116,320 5,561,746 19,730,005 9,850,476 8,654,637 5,005,448 2,045,624 14,130,899 4,784,554 5,434,157 74,717,479 12,373,887 5,841,455 7,740,006 2,252,364 3,892,833 5,071,957 590,341,362
48.41 43.49 36.32 37.13 36.58 36.72 37.24 36.73 37.81 36.51 36.94 46.33 55.75 52.37 55.09 62.32 69.63 69.48 55.94 66.82 57.17 67.81 68.74 29.86 67.04 67.36 68.68 38.09 60.46 54.28 77.85 31.51 54.22 68.83 47.57
52.43 48.49 39.82 40.63 40.08 40.22 40.74 40.23 41.31 40.01 40.44 49.83 59.25 55.87 58.59 65.82 73.13 72.98 59.44 70.32 60.67 71.31 72.24 33.36 70.54 70.86 72.18 41.59 63.96 57.78 81.35 35.01 57.72 72.33 51.55
180,012,993 3,204,037 7,164,418 14,631,069 3,211,175 2,161,874 2,806,692 4,217,940 4,606,074 5,401,518 4,432,832 2,919,481 1,482,746 6,599,770 8,384,589 1,284,704 21,345,548 3,491,368 4,448,360 9,985,623 7,770,713 4,037,731 1,436,338 1,388,069 10,210,697 1,448,785 3,295,995 17,087,597 7,157,688 2,499,886 3,545,567 1,525,772 3,163,507 3,664,830 191,110,692
233,318,541 190,738,973 10,607,627 31,971,941 236,329,906
413,331,534 193,943,010 7,164,418 14,631,069 3,211,175 2,161,874 2,806,692 4,217,940 4,606,074 5,401,518 4,432,832 2,919,481 1,482,746 6,599,770 18,992,216 1,284,704 21,345,548 3,491,368 4,448,360 9,985,623 7,770,713 4,037,731 1,436,338 1,388,069 10,210,697 1,448,785 3,295,995 49,059,538 7,157,688 2,499,886 3,545,567 1,525,772 3,163,507 3,664,830 427,440,598
35.95 48.66 37.09 54.68 29.15 23.06 29.22 42.52 28.10 44.12 54.62 24.57 11.23 15.19 27.04 13.15 23.12 39.66 44.74 33.82 45.10 31.64 19.72 20.26 48.44 20.40 41.66 25.01 34.98 23.23 35.66 21.35 44.06 49.74 34.44
35.99 40.74 42.74 58.05 34.34 34.60 23.97 37.25 28.88 47.41 60.77 23.31 13.00 2.93 48.21 15.97 15.56 50.59 74.05 42.96 56.67 30.20 21.71 60.05 54.85 29.40 53.47 29.60 49.50 21.50 47.51 30.52 62.07 51.97 35.11
(143,198,098) 20,615,207 149,221 4,695,766 (819,258) (1,280,257) (770,840) 573,845 (1,590,830) 932,165 1,434,760 (2,585,263) (5,880,203) (16,151,377) (19,693,788) (4,803,286) (42,950,581) (2,624,952) (1,113,386) (9,744,382) (2,079,763) (4,616,906) (3,569,110) (657,555) (3,920,202) (3,335,769) (2,138,162) (25,657,941) (5,216,199) (3,341,569) (4,194,439) (726,592) (729,326) (1,407,127) (162,900,764)
(12.46) 5.17 0.77 17.55 (7.44) (13.66) (8.02) 5.78 (9.71) 7.61 17.68 (21.76) (44.52) (37.18) (28.04) (49.17) (46.51) (29.82) (11.20) (33.00) (12.07) (36.18) (49.01) (9.60) (18.60) (46.96) (27.02) (13.08) (25.49) (31.05) (42.19) (10.17) (10.16) (19.10) (13.13)
PERMASALAHAN DAN TINDAK LANJUT PROGRES KEGIATAN TA. 2010 DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN STATUS: 29 JULI 2010 NO
SATKER/PROVINSI
PROGRES KEU FISIK (%) (%)
ALASAN KETERLAMBATAN
TINDAK LANJUT
KETERANGAN
1 Dit. PPLP (Pusat)
15.46
24.00 1. 3 paket pendampingan penyusunan Strategi Sanitasi Kota (SSK) terlambat menarik Percepatan proses penagihan termin I uang muka 2. Paket penyusunan Masterplan Air Limbah Kota Balikpapan gagal tender Usulan revisi DIPA (bersama dana sisa lelang) untuk kegiatan sosialisasi DAK SLBM, Pelatihan TFL DAK/Sanimas, Operasional PMU/PIU/Satgas 3. Supervisi Semarang Urban Drainage belum ada penyerapan menunggu addendum Penyelesaian addendum kontrak dan proses Saat ini sedang kontrak penagihan pengajuan ke KPPN menunggu Withdrawal Aplication 4 Pekerjaan Peningkatan Kapasitas SDM/Outbond (Swakelola) belum dilaksanakan. Penyediaan dokumen lelang untuk Penyedian akomodasi harus melalui pelelangan penyediaan akomodasi (hotel) 5. WASAP-D masih dalam proses lelang Revisi DIPA untuk pencantuman nomor register
2 DKI Jakarta
11.23
13.00 1. Ada sanggah banding untuk pembangunan Tempat Pengolahan Sampah Terpadu Rencana penarikan uang muka + 600 Juta (TPST). Kontrak minggu ke 3 Juli 2010. Rupiah (SPM 30/07/2010) 2. Jakarta Urgent Flood & Mitigation Project (JUFMP) Loan belum efektif
3 Jawa Barat
15.19
2.93
1. DED yang ada tidak sesuai dengan kondisi lapangan dan Evaluasi lelang bertambah 2 bulan untuk paket pembangunan Land Fill TPA Regional Nambo Kabupaten Bogor
Review DED dengan berkoordinasi dengan Sudah dalam masa BPSR (Badan Pengelola Sampah Regional) pelaksanaan kontrak
2. DED yang ada tidak sesuai dengan lapangan untuk paket peningkatan Prasarana dan Sarana TPA Pecuk Kabupaten Indramayu
Review DED dikerjakan oleh Dinas Sudah dalam masa Kebersihan dan Pertamanan Kab. Indramayu pelaksanaan TA. 2010 kontrak
NO
SATKER/PROVINSI
3 Jawa Barat
PROGRES ALASAN KETERLAMBATAN KEU FISIK (%) (%) 15.19 2.93 3. Perlu Koordinasi dan Pembahasan dengan Pemeritah Kota Depok dalam pembuatan TOR dan evaluasi lelang lama (5 bulan) untuk paket penyusunan Master Plan dan DED Drainase Perkotaan Kota Depok
TINDAK LANJUT Dilakukan koordinasi dengan Walikota dan unsur terkait dalam penyusunan TOR
KETERANGAN Sudah dalam masa pelaksanaan kontrak
4. Dana yang ada tidak cukup untuk satu kota (perlu foto udara) dan evaluasi untuk Dilaksanakan 1/2 kota penyusunan Master Plan dan DED Drainase Perkotaan Kota Bekasi lelang lama (5 bulan)
Sudah dalam masa pelaksanaan kontrak
5. Perpindahan lokasi pada paket pembangunan Air Limbah Terpusat Skala Kawasan Dilakukan survey ulang muli tg 8 Juli 2010 (RSH Tenjoresmi ) Kabupaten Sukabumi dan akan dibuatkan DED oleh satker PLP
Pengumuman lelang 30 Juli 2010
6. Pada paket pembangunan PS. Air Limbah Terpusat Kota Bandung (Lanjutan) : - DED belum siap dilelang (waktu pengumuman lelang mundur 2 bln)
Diperbaiki/direview oleh PDAM Kota Bandung Sudah dalam masa pelaksanaan kontrak
- Proses perijinan pelintasan sungai terlambat
Tgl 23 Juli 2010 kordinasi dengan BBWS Citarum/Dirjen SDA. Tanggal 30 Juli 2010 Pembahasan Rekomendasi Teknis
- Ijin penggunaan rumija dari Dirjen Bina Marga sudah ada th 2008, Untuk pelaksanaan TA 2010 menunggu persetujuan Balai Besar Pelaksana Jalan Nasional IV
- Ada Pengaduan dari Masyarakat yang perlu dikonsultasikan ke BPKSDM dan dikonfirmasi ke KPPU
- Kepolisian minta untuk lokasi Jl. Soekarno Hatta dikerjakan setelah lebaran
Ada permintaan rekomendasi teknis dari Dirjen SDA kepada BBWS Citarum Tgl. 26 Juli 2010 kordinasi dan mengirim Ada permintaan surat perihal permohonan percepatan rekomendasi teknis perijinan dari BBPJN IV. Tanggal 31 juli 2010 dari Dirjen SDA Peninjauan Lapangan kepada BBWS Citarum Dilakukan konsultasi ke BPKSDM dan sudah Menunggu surat melayangkan surat ke KPPU balasan dari KPPU sebagai dasar dalam menandatangani kontrak Penyesuain jadwal, dan penambahan alat
NO
SATKER/PROVINSI
3 Jawa Barat
4 D.I. Yogyakarta
PROGRES ALASAN KETERLAMBATAN KEU FISIK (%) (%) 15.19 2.93 7. Pada paket pembangunan PS. Air Limbah Terpusat Kota Cirebon : - DED dari PDAM Kota Cirebon belum siap dilelang
13.15
15.97 1. 2 3
5 Gorontalo
19.72
4 21.71 1. 2.
3
TINDAK LANJUT
Pembuatan DED oleh PDAM Kota Cirebon
KETERANGAN
Sudah dalam pelaksanaan kontrak - Perijinan pelintasan rel Kereta Api dan surat pernyataan dari Dinas LH Kt. Cirebon Perijinan pelintasan rel Kereta Api diproses Menunggu (tgl. 2 Agustus 2010) oleh PDAM Kota Cirebon persetujuan dari Direktora Perkeretaapian Kementrian Perhubungan - Perlu proses perijinan jalan Nasional Tgl. 26 Juli 2010 koordinasi dengan BBPJN Menunggu IV dan menyampaikan surat permohonan ijin perijinan dan dari Satker PPLP Rekomendasi Teknis dari BBPJN IV Menunggu penyelesaian DED untuk pekerjaan pembangunan TPST UGM Penyelesaian DED Sudah dilaksanakan Tender ulang dan dan menunggu kesepakatan Pemkab dan masyarakat untuk Percepatan proses tender ulang ujicoba pengelolaan TPA Kulonprogo Pembangunan PS Air Limbah Terpusat (MSMHP) belum ditanda tangani Loan Persiapan pemaketan pelelangan Agreementnya (Loan belum efektif) Tender ulang untuk pekerjaan masterplan dan DED TPA Gunung Kidul Percepatan proses tender ulang 2 paket pembangunan 3R dalam proses lelang (Kab. Pahuwato & Kab. Gorontalo Akan mempercepat proses evaluasi lelang Utara) Tender ulang pada paket bantuan perencanaan PS sampah terpadu 3R Kab. Akan mempercepat proses tender ulang Status lelang Gorontalo Utara dan Kab. Pohuwato sudah sampai evaluasi penawaran usulan teknis Ada sanggah pada paket pembangunan TPA sampah Polohungo Kab. Boalemo Penyelesaiaan sanggahan Tidak ada sanggah banding, paket sudah terkontrak
NO
SATKER/PROVINSI
PROGRES KEU FISIK (%) (%)
ALASAN KETERLAMBATAN
TINDAK LANJUT
4 MoU antara Kota, Kab. dan Provinsi Gorontalo baru selesai, dan tender ulang pada Akan mempercepat proses tender ulang paket bantuan teknis penyiapan kelembagaan UPTD yang akan menerapkan PPK BLUD pada TPA Regional Talumelito
6 Sulawesi Tengah
20.26 60.05
Keterlambatan kontraktor melakukan penagihan untuk pekerjaan peningkaan kinerja TPA Kota Palu
7 Sulawesi Barat
20.40 29.40 1. Paket pemberdayaan, pembangunan 3R belum lelang
Mempercepat penyusunan DED
8 Maluku Utara
21.35 30.52 1. Bintang di DIPA pada paket pengadaan mobil penyuluhan kampanye dan edukasi 3R bidang PLP 2. DED TPA Marabose yang belum valid 3. Perubahan lokasi pembangunan PS Sampah Terpadu 3R 4. Terlambatnya menemukan lokasi untuk pembangunan PS Sampah Terpadu 3R
Revisi DIPA
KETERANGAN Status lelang sudah sampai penetapan hasil prakualifikasi
Akan mempercepat proses penagihan
Mereview kembali DED TPA Marabose Koordinasi dengan Pemda setempat Penambahan Tenaga Kerja untuk pembangunan PS Sampah Terpadu 3R
Revisi DIPA ditolak DJA
RENCANA DAN REALISASI PENYERAPAN DIREKTORAT PENYEHATAN LINGKUNGAN DAN PERMUKIMAN TAHUN ANGGARAN 2010 1,400,000 1,240,969
1,240,969 1,179,442
1,200,000 1,104,924
977,078
DALAM JUTAAN RUPIAH
1,000,000
788,455
800,000
PAGU
590,341
600,000
RENCANA REALISASI
398,758
427,441
400,000
219,814 200,000
198,635 105,066 19,316
4,054
-
-
295,132 281,632
-
JAN
38,158 54,688 109,724
46,627 4,458 199 FEB868 MAR
APR
145,087155,717
MEI
JUN BULAN
JUL
AGT
SEP
OKT
NOP
DES
LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010 DIREKTORAT PENGEMBANGAN PERMUKIMAN PAKET > RP 100 JUTA STATUS : 29 JULI 2010, JAM 08.00 WIB NO
1 2 3 4
PAGU
KODE SATKER
NAMA SATUAN KERJA
a. 452771 488822 493181 487760
Satker Pusat Dit. Bangkim Penyediaan PS Agropolitan Pelak. Bangkim (Rusunawa) NUSSP
345,524,135 36,263,947 6,791,452 300,468,736 2,000,000
b.
553,799,525
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
486479 486485 486491 486505 493336 486511 486686 486520 487723 486536 487732 486432 486448 486454 486460
Satker Propinsi Wilayah 1 Bangkim NAD Bangkim Sumatera Utara Bangkim Sumatera Barat Bangkim Riau Bangkim Kepulauan Riau Bangkim Jambi Bangkim Bengkulu Bangkim Sumatera Selatan Bangkim Bangka Belitung Bangkim Lampung Bangkim Banten Bangkim Jawa Barat Bangkim Jawa Tengah Bangkim D.I.Yogyakarta Bangkim Jawa Timur
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
486542 486551 486567 486573 486582 487748 486598 486602 452796 486618 486649 486655 486661 486624 486630 486670 493769
1 2 3 4 5
RUPIAH MURNI
PAGU (Rp)
PLN
TOTAL
24,000,000
24,000,000 -
SWAKELOLA + KONTRAKTUAL AP ≤ 100 JT
369,524,135 36,263,947 6,791,452 300,468,736 26,000,000
35,334,980 24,030,573 3,641,452 5,662,955 2,000,000
899,000 899,000 -
553,799,525
52,024,867
30,616,239
PAKET KONTRAK
KONTRAKTUAL > 100 JT RPM PHLN TOTAL
BLM
TOTAL
309,290,155 24,000,000 12,233,374 3,150,000 293,906,781 24,000,000
333,290,155 12,233,374 3,150,000 293,906,781 24,000,000
-
369,524,135 36,263,947 6,791,452 300,468,736 26,000,000
47 14 4 28 1
471,158,419
471,158,419
-
553,799,525
116 62 5 3 3 4 3 3 2 3 6 3 4 5 9 2 7 54 2 5 2 3
-
16,015,681 19,694,531 19,807,195 17,695,426 17,666,453 12,400,907 14,506,843 19,016,673 12,343,747 14,831,581 15,064,735 21,344,247 27,775,972 13,543,216 26,324,870
16,015,681 19,694,531 19,807,195 17,695,426 17,666,453 12,400,907 14,506,843 19,016,673 12,343,747 14,831,581 15,064,735 21,344,247 27,775,972 13,543,216 26,324,870
1,397,256 1,361,167 1,397,360 1,511,311 2,201,583 1,181,327 2,456,323 1,353,908 1,309,487 1,157,926 1,242,175 1,321,234 1,752,852 1,119,560 2,393,500
910,000 1,026,259 1,369,580 1,257,000 1,946,000 605,700 780,805 1,409,500 1,181,380 1,945,031 883,125 935,000 1,185,000 900,000 2,730
13,708,425 17,307,105 17,040,255 14,927,115 13,518,870 10,613,880 11,269,715 16,253,265 9,852,880 11,728,624 12,939,435 19,088,013 24,838,120 11,523,656 23,928,640
-
13,708,425 17,307,105 17,040,255 14,927,115 13,518,870 10,613,880 11,269,715 16,253,265 9,852,880 11,728,624 12,939,435 19,088,013 24,838,120 11,523,656 23,928,640
-
16,015,681 19,694,531 19,807,195 17,695,426 17,666,453 12,400,907 14,506,843 19,016,673 12,343,747 14,831,581 15,064,735 21,344,247 27,775,972 13,543,216 26,324,870
Wilayah 2 Bangkim Kalimantan Barat Bangkim Kalimantan Tengah Bangkim Kalimantan Selatan Bangkim Kalimantan Timur Bangkim Sulawesi Utara Bangkim Gorontalo Bangkim Sulawesi Tengah Bangkim Sulawesi Selatan Bangkim Sulawesi Barat Bangkim Sulawesi Tenggara Bangkim Bali Bangkim Nusa Tenggara Barat Bangkim Nusa Tenggara Timur Bangkim Maluku Bangkim Maluku Utara Bangkim Papua Bangkim Papua Barat
28,503,078 16,187,052 16,309,887 15,987,138 17,405,359 12,910,704 15,364,778 23,813,207 13,778,243 18,469,102 20,534,704 17,595,022 14,757,214 15,863,485 12,259,539 13,326,883 12,702,053
28,503,078 16,187,052 16,309,887 15,987,138 17,405,359 12,910,704 15,364,778 23,813,207 13,778,243 18,469,102 20,534,704 17,595,022 14,757,214 15,863,485 12,259,539 13,326,883 12,702,053
2,010,848 1,069,593 1,222,642 1,645,258 1,740,969 2,069,254 1,389,378 2,933,302 1,376,384 2,357,802 1,113,289 1,615,022 2,436,839 1,541,470 1,438,329 1,501,443 1,406,076
1,525,000 450,000 1,328,500 850,000 855,000 147,282 1,223,867 219,930 1,650,000 375,000 825,000 2,125,000 (700,000) 914,550 300,000 885,000 1,305,000
24,967,230 14,667,459 13,758,745 13,491,880 14,809,390 10,694,168 12,751,533 20,659,975 10,751,859 15,736,300 18,596,415 13,855,000 13,020,375 13,407,465 10,521,210 10,940,440 9,990,977
-
24,967,230 14,667,459 13,758,745 13,491,880 14,809,390 10,694,168 12,751,533 20,659,975 10,751,859 15,736,300 18,596,415 13,855,000 13,020,375 13,407,465 10,521,210 10,940,440 9,990,977
-
28,503,078 16,187,052 16,309,887 15,987,138 17,405,359 12,910,704 15,364,778 23,813,207 13,778,243 18,469,102 20,534,704 17,595,022 14,757,214 15,863,485 12,259,539 13,326,883 12,702,053
TOTAL
899,323,660
923,323,660
87,359,847
31,515,239
780,448,574
804,448,574
-
923,323,660
Keterangan : Penyiapan Dokumen Lelang Pengumuman Lelang/Prakualifikasi Penyusunan shortlist Undangan Pelelangan Penjelasan Pekerjaan Aanwyzing
6 7 8 9 10
24,000,000
Pemasukan Penawaran Usulan Pemenang Penetapan Pemenang Penerbitan Surat Perintah Mulai Kerja Penandatangan Kontrak
NON FISIK
24,000,000
FISIK TOTAL
1
2
97 14 4 78 1
20
482 206 14 19 17 13 7 12 18 14 5 9 12 15 26 10 15
598 268 19 22 20 17 10 15 20 17 11 12 16 20 35 12 22
1 1
2 2 4 1 2 12 2 9 2 2 3 1
276 22 17 14 8 25 11 30 35 15 13 18 16 8 12 11 8 13
330 24 22 16 11 25 13 32 39 16 15 30 18 17 14 13 11 14
163
532
695
-
50
JUMLAH PAKET DALAM PROSES PRA KONTRAK
50 -
3 2
-
20
2
-
4
5
6
-
18
-
-
-
18
-
3 2
7 7
8
9
-
-
-
-
7
-
4 3
394,962,966 189,016,732 11,521,634 16,013,960 11,345,172 11,199,467 11,849,816 10,283,675 11,106,928 13,955,095 7,858,885 11,467,575 12,699,735 14,830,044 18,215,434 8,315,310 18,354,002
1
3
324 24 22 13 11 25 11 32 39 16 15 30 18 16 14 13 11 14
205,946,234 23,567,969 14,507,267 6,652,536 11,324,458 12,995,146 6,626,379 11,810,747 17,265,193 9,377,969 15,569,109 13,410,328 8,846,499 10,085,656 13,243,588 10,090,263 10,654,223 9,918,904
633
452,261,725
3
-
1
-
1
3
1
1
1
21
2
-
-
21
-
11
57,298,759 11,187,149 2,927,883 19,183,727 24,000,000
583 259 19 22 2 18 1 16 10 15 20 16 10 12 16 19 32 12 22
1
-
50 14 4 31 1 6 3
1
-
NILAI KONTRAK (Rp. x 1.000)
1 -
1
-
10
1
6
RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010 DIREKTORAT PENGEMBANGAN PERMUKIMAN STATUS : 29 JULI 2010 NO.
URAIAN PERMASALAHAN
JUMLAH PAKET
1
Persiapan Lelang
21
2
Proses Lelang
41
3
Proses Sanggah Banding
-
4
Proses Tender Ulang
-
5
Review DED
-
6
Diblokir (Tanda Bintang) oleh Ditjen Anggaran a. Loan belum efektif b. Menunggu Penandatanganan Loan Agreement c. Tanggap Darurat d. Revisi Kegiatan e. Belum tersedia dokumen RPIJM f. Menunggu persyaratan pembuktian BMN
-
7
Pemindahan Lokasi
TOTAL
62
TINDAK LANJUT
KETERANGAN
Perincian paket terlampir.
PERMASALAHAN PAKET BELUM LELANG DIREKTORAT PENGEMBANGAN PERMUKIMAN STATUS : 29 JULI 2010 NO
1
SATKER/PROVINSI
RUSUNAWA
JML PAKET BELUM LELANG
PAKET KONTRAK/RINCIAN KEGIATAN
Dilelang pada awal Agustus
2 Perbaikan Rusunawa di Bandar Lampung
400,000
Dilelang pada awal Agustus
3 Perbaikan Rusunawa di Bogor
400,000
Dilelang pada awal Agustus
4 Perbaikan Rusunawa di Jogja
400,000
Dilelang pada awal Agustus
5 Perbaikan Rusunawa di Sumsel
200,000
Dilelang pada awal Agustus
6 Perbaikan Rusunawa di Bengkulu
300,000
Dilelang pada awal Agustus
7 Perbaikan rusunawa di Padang
500,000
Dilelang pada awal Agustus
8 Perbaikan Rusunawa di Cingised, Bandung
900,000
Dilelang pada awal Agustus
9 Perbaikan Rusunawa di Solo
400,000
Dilelang pada awal Agustus
10 Perbaikan Rusunawa di Sleman
300,000
Dilelang pada awal Agustus
11 Perbaikan Rusunawa di Cilacap
400,000
Dilelang pada awal Agustus
12 Pembuatan Sewage Treatmen Plant di Kws Rusunami Pulo Gebang Jakarta Timur
3,600,000
Dilelang pada akhir Juli
13 Pembangunan PSD di Kawasan Rusunawa Sidoarjo Ngelom, Jawa Timur
1,000,000
Dilelang pada akhir Juli
Menginventarisir lahan-lahan yang siap & Persiapan Dok. Lelang
550,000
Dilelang pada akhir Juli
1,000,000
Dilelang pada akhir Juli
Menginventarisir lahan-lahan yang siap & Persiapan Dok. Lelang Menginventarisir lahan-lahan yang siap & Persiapan Dok. Lelang
578,252
Dilelang pada akhir Juli
Menginventarisir lahan-lahan yang siap & Persiapan Dok. Lelang
1,000,000
Dilelang pada akhir Juli
Menginventarisir lahan-lahan yang siap & Persiapan Dok. Lelang
17 Pembangunan PSD di Kws Rusunawa Bau Bau, Sulawesi Tenggara 18 Pembangunan Rusunawa Lokasi Rempoa 19 Pembangunan Rusunawa Lokasi Surabaya 20 Pembangunan Rusunawa Lokasi Padang 1 - Pembangunan Jalan Poros Lokasi Kws.Salepliat Kabupaten Bangka Selatan
21
Menginventarisir data-data Kerusakan Pasca Gempa & Persiapan Dok. Lelang Menginventarisir data-data Kerusakan Pasca Gempa & Persiapan Dok. Lelang Menginventarisir data-data Kerusakan Pasca Gempa & Persiapan Dok. Lelang Menginventarisir data-data Kerusakan Pasca Gempa & Persiapan Dok. Lelang Menginventarisir data-data Kerusakan Pasca Gempa & Persiapan Dok. Lelang Menginventarisir data-data Kerusakan Pasca Gempa & Persiapan Dok. Lelang Menginventarisir data-data Kerusakan Pasca Gempa & Persiapan Dok. Lelang Menginventarisir data-data Kerusakan Pasca Gempa & Persiapan Dok. Lelang Menginventarisir data-data Kerusakan Pasca Gempa & Persiapan Dok. Lelang Menginventarisir data-data Kerusakan Pasca Gempa & Persiapan Dok. Lelang Menginventarisir data-data Kerusakan Pasca Gempa & Persiapan Dok. Lelang Menginventarisir lahan-lahan yang siap & Persiapan Dok. Lelang
600,000
16 Pembangunan PSD dan Pengadaan Perlengkapan Sarana Gedung di Kws Rusunawa Kendari, Sulawesi Tenggara
TOTAL
TINDAK LANJUT
1 Perbaikan Rusunawa di Medan
15 Pembuatan PSD di Kws Rusunawa Pringwulung Condongcatur Kota Sleman Jogyakarta
BANGKA BELITUNG
PENJELASAN BELUM DILELANGKAN
45,756,781
20
14 Pembuatan MCK di Kws Kumuh Rel Kereta Api di Tanjung Priok Jakarta Utara
2
PAGU (X Rp.1000)
13,628,529 5,950,000 13,650,000 1,474,505 1,474,505 Revisi ulang POK sudah selesai, tetapi belum dilelangkan karena sedang dalam proses exofficio 47,231,286
KETERANGAN
LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010 DIREKTORAT PENGEMBANGAN PERMUKIMAN STATUS : 29 JULI 2010, JAM 08.00 WIB PAGU
NO
KODE SATKER
1 2 3 4
452771 488822 493181 487760
Satker Pusat Dit. Bangkim Penyediaan PS Agropolitan Pelak. Bangkim (Rusunawa) NUSSP
345,524,135 36,263,947 6,791,452 300,468,736 2,000,000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
486479 486485 486491 486505 493336 486511 486686 486520 487723 486536 487732 486432 486448 486454 486460
SATKER PROPINSI Wilayah 1 Bangkim NAD Bangkim Sumatera Utara Bangkim Sumatera Barat Bangkim Riau Bangkim Kepulauan Riau Bangkim Jambi Bangkim Bengkulu Bangkim Sumatera Selatan Bangkim Bangka Belitung Bangkim Lampung Bangkim Banten Bangkim Jawa Barat Bangkim Jawa Tengah Bangkim D.I.Yogyakarta Bangkim Jawa Timur
553,799,525 268,032,077 16,015,681 19,694,531 19,807,195 17,695,426 17,666,453 12,400,907 14,506,843 19,016,673 12,343,747 14,831,581 15,064,735 21,344,247 27,775,972 13,543,216 26,324,870
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
486542 486551 486567 486573 486582 487748 486598 486602 452796 486618 486649 486655 486661 486624 486630 486670 493769
Wilayah 2 Bangkim Kalimantan Barat Bangkim Kalimantan Tengah Bangkim Kalimantan Selatan Bangkim Kalimantan Timur Bangkim Sulawesi Utara Bangkim Gorontalo Bangkim Sulawesi Tengah Bangkim Sulawesi Selatan Bangkim Sulawesi Barat Bangkim Sulawesi Tenggara Bangkim Bali Bangkim Nusa Tenggara Barat Bangkim Nusa Tenggara Timur Bangkim Maluku Bangkim Maluku Utara Bangkim Papua Bangkim Papua Barat
NAMA SATUAN KERJA
TOTAL
PAGU (Rp) KONTRAKTUAL > 100 JT RPM PHLN TOTAL
SWAKELOLA + AP
KONTRAKTUAL ≤ 100 JT
369,524,135 36,263,947 6,791,452 300,468,736 26,000,000
35,334,980 24,030,573 3,641,452 5,662,955 2,000,000
899,000 899,000 -
309,290,155 12,233,374 3,150,000 293,906,781
-
553,799,525 268,032,077 16,015,681 19,694,531 19,807,195 17,695,426 17,666,453 12,400,907 14,506,843 19,016,673 12,343,747 14,831,581 15,064,735 21,344,247 27,775,972 13,543,216 26,324,870
52,024,867 23,156,969 1,397,256 1,361,167 1,397,360 1,511,311 2,201,583 1,181,327 2,456,323 1,353,908 1,309,487 1,157,926 1,242,175 1,321,234 1,752,852 1,119,560 2,393,500
30,616,239 16,337,110 910,000 1,026,259 1,369,580 1,257,000 1,946,000 605,700 780,805 1,409,500 1,181,380 1,945,031 883,125 935,000 1,185,000 900,000 2,730
471,158,419 228,537,998 13,708,425 17,307,105 17,040,255 14,927,115 13,518,870 10,613,880 11,269,715 16,253,265 9,852,880 11,728,624 12,939,435 19,088,013 24,838,120 11,523,656 23,928,640
285,767,448 28,503,078 16,187,052 16,309,887 15,987,138 17,405,359 12,910,704 15,364,778 23,813,207 13,778,243 18,469,102 20,534,704 17,595,022 14,757,214 15,863,485 12,259,539 13,326,883 12,702,053
-
285,767,448 28,503,078 16,187,052 16,309,887 15,987,138 17,405,359 12,910,704 15,364,778 23,813,207 13,778,243 18,469,102 20,534,704 17,595,022 14,757,214 15,863,485 12,259,539 13,326,883 12,702,053
28,867,898 2,010,848 1,069,593 1,222,642 1,645,258 1,740,969 2,069,254 1,389,378 2,933,302 1,376,384 2,357,802 1,113,289 1,615,022 2,436,839 1,541,470 1,438,329 1,501,443 1,406,076
14,279,129 1,525,000 450,000 1,328,500 850,000 855,000 147,282 1,223,867 219,930 1,650,000 375,000 825,000 2,125,000 (700,000) 914,550 300,000 885,000 1,305,000
242,620,421 24,967,230 14,667,459 13,758,745 13,491,880 14,809,390 10,694,168 12,751,533 20,659,975 10,751,859 15,736,300 18,596,415 13,855,000 13,020,375 13,407,465 10,521,210 10,940,440 9,990,977
899,323,660
24,000,000
923,323,660
87,359,847
31,515,239
780,448,574
RUPIAH MURNI
PLN
TOTAL
24,000,000 24,000,000 -
PAGU TERKONTRAK BLM
TOTAL
333,290,155 12,233,374 3,150,000 293,906,781 24,000,000
-
369,524,135 36,263,947 6,791,452 300,468,736 26,000,000
35,483,374 12,233,374 3,150,000 20,100,000 -
-
471,158,419 228,537,998 13,708,425 17,307,105 17,040,255 14,927,115 13,518,870 10,613,880 11,269,715 16,253,265 9,852,880 11,728,624 12,939,435 19,088,013 24,838,120 11,523,656 23,928,640
-
553,799,525 268,032,077 16,015,681 19,694,531 19,807,195 17,695,426 17,666,453 12,400,907 14,506,843 19,016,673 12,343,747 14,831,581 15,064,735 21,344,247 27,775,972 13,543,216 26,324,870
455,378,996 221,393,493 13,708,425 17,307,105 15,090,255 13,977,115 13,518,870 10,613,880 11,269,715 14,303,265 8,378,375 11,728,624 12,939,435 18,818,013 24,288,120 11,523,656 23,928,640
-
242,620,421 24,967,230 14,667,459 13,758,745 13,491,880 14,809,390 10,694,168 12,751,533 20,659,975 10,751,859 15,736,300 18,596,415 13,855,000 13,020,375 13,407,465 10,521,210 10,940,440 9,990,977
-
285,767,448 28,503,078 16,187,052 16,309,887 15,987,138 17,405,359 12,910,704 15,364,778 23,813,207 13,778,243 18,469,102 20,534,704 17,595,022 14,757,214 15,863,485 12,259,539 13,326,883 12,702,053
233,985,503 24,967,230 14,667,459 8,585,745 13,491,880 14,809,390 8,082,250 12,751,533 20,659,975 10,751,859 15,736,300 18,596,415 13,855,000 12,170,375 13,407,465 10,521,210 10,940,440 9,990,977
804,448,574
-
923,323,660
490,862,370
24,000,000
24,000,000
24,000,000
RPM
PHLN
TOTAL
24,000,000 24,000,000
( x Rp. 1.000 ) SISA PAGU KONTRAK
NILAI KONTRAK RPM
PHLN
RPM
PHLN
TOTAL
57,298,759 11,187,149 2,927,883 19,183,727 24,000,000
2,184,615 1,046,225 222,117 916,273 -
-
2,184,615 1,046,225 222,117 916,273 -
59,483,374 12,233,374 3,150,000 20,100,000 24,000,000
33,298,759 11,187,149 2,927,883 19,183,727 -
-
455,378,996 221,393,493 13,708,425 17,307,105 15,090,255 13,977,115 13,518,870 10,613,880 11,269,715 14,303,265 8,378,375 11,728,624 12,939,435 18,818,013 24,288,120 11,523,656 23,928,640
394,962,966 189,016,732 11,521,634 16,013,960 11,345,172 11,199,467 11,849,816 10,283,675 11,106,928 13,955,095 7,858,885 11,467,575 12,699,735 14,830,044 18,215,434 8,315,310 18,354,002
-
394,962,966 189,016,732 11,521,634 16,013,960 11,345,172 11,199,467 11,849,816 10,283,675 11,106,928 13,955,095 7,858,885 11,467,575 12,699,735 14,830,044 18,215,434 8,315,310 18,354,002
60,416,030 32,376,761 2,186,791 1,293,145 3,745,083 2,777,648 1,669,054 330,205 162,787 348,170 519,490 261,049 239,700 3,987,969 6,072,686 3,208,346 5,574,638
-
60,416,030 32,376,761 2,186,791 1,293,145 3,745,083 2,777,648 1,669,054 330,205 162,787 348,170 519,490 261,049 239,700 3,987,969 6,072,686 3,208,346 5,574,638
-
233,985,503 24,967,230 14,667,459 8,585,745 13,491,880 14,809,390 8,082,250 12,751,533 20,659,975 10,751,859 15,736,300 18,596,415 13,855,000 12,170,375 13,407,465 10,521,210 10,940,440 9,990,977
205,946,234 23,567,969 14,507,267 6,652,536 11,324,458 12,995,146 6,626,379 11,810,747 17,265,193 9,377,969 15,569,109 13,410,328 8,846,499 10,085,656 13,243,588 10,090,263 10,654,223 9,918,904
-
205,946,234 23,567,969 14,507,267 6,652,536 11,324,458 12,995,146 6,626,379 11,810,747 17,265,193 9,377,969 15,569,109 13,410,328 8,846,499 10,085,656 13,243,588 10,090,263 10,654,223 9,918,904
28,039,269 1,399,261 160,192 1,933,209 2,167,422 1,814,244 1,455,871 940,786 3,394,782 1,373,890 167,191 5,186,087 5,008,501 2,084,719 163,877 430,947 286,217 72,073
-
28,039,269 1,399,261 160,192 1,933,209 2,167,422 1,814,244 1,455,871 940,786 3,394,782 1,373,890 167,191 5,186,087 5,008,501 2,084,719 163,877 430,947 286,217 72,073
514,862,370
428,261,725
452,261,725
62,600,645
-
62,600,645
24,000,000
24,000,000 24,000,000
TOTAL
24,000,000
RENCANA PENYERAPAN DAN PROGRES KEUANGAN DIREKTORAT PENGEMBANGAN PERMUKIMAN STATUS : 29 JULI 2010, JAM 08.00 WIB ( X Rp. 1000 )
NO
KODE SATKER
RENCANA PENYERAPAN AKHIR BULAN JULI
PAGU NAMA SATUAN KERJA RUPIAH MURNI
RUPIAH MURNI
TOTAL
24,000,000
369,524,135 36,263,947 6,791,452 300,468,736 26,000,000
66,792,183 15,493,298 2,733,916 33,395,959 15,169,010
18.08 42.72 40.26 11.11 58.34
20.68 42.74 27.45 15.26 50.73
21,432,455 15,384,033 1,754,686 3,385,473 908,263
553,799,525 268,032,077 16,015,681 19,694,531 19,807,195 17,695,426 17,666,453 12,400,907 14,506,843 19,016,673 12,343,747 14,831,581 15,064,735 21,344,247 27,775,972 13,543,216 26,324,870
212,336,565 93,142,762 5,449,927 6,543,451 6,727,433 6,075,988 6,943,196 4,134,798 5,005,836 6,418,728 4,630,361 5,813,702 5,189,103 7,708,800 9,546,559 4,728,377 8,226,505
38.34 34.75 34.03 33.22 33.96 34.34 39.30 33.34 34.51 33.75 37.51 39.20 34.45 36.12 34.37 34.91 31.25
39.57 35.56 34.53 33.72 34.46 34.84 39.80 33.84 38.62 34.25 38.01 39.70 34.95 36.62 34.87 35.41 32.87
218,893,458 104,239,842 5,223,223 7,808,290 5,141,839 5,582,090 6,493,706 6,801,391 6,296,130 3,778,992 3,851,077 10,903,152 10,557,964 10,760,767 8,266,826 6,830,988 5,943,407
-
285,767,448 28,503,078 16,187,052 16,309,887 15,987,138 17,405,359 12,910,704 15,364,778 23,813,207 13,778,243 18,469,102 20,534,704 17,595,022 14,757,214 15,863,485 12,259,539 13,326,883 12,702,053
119,193,802 7,502,909 9,440,507 5,999,033 8,247,552 6,075,949 7,159,937 7,603,013 11,501,108 4,480,862 6,174,611 10,850,060 6,665,090 5,949,671 6,287,052 3,368,858 6,908,432 4,979,156
41.71 26.32 58.32 36.78 51.59 34.91 55.46 49.48 48.30 32.52 33.43 52.84 37.88 40.32 39.63 27.48 51.84 39.20
43.34 26.92 59.65 37.62 52.76 35.70 60.23 50.61 52.82 33.26 35.69 54.04 38.74 43.91 40.53 28.10 53.02 40.09
114,653,616 7,717,342 10,173,372 2,207,761 4,904,919 9,693,346 1,910,219 6,240,306 14,462,643 745,705 9,583,396 6,963,535 4,871,604 3,513,580 11,936,159 4,884,885 8,593,168 6,251,676
-
923,323,660
279,128,748
30.23
32.01
240,325,913
Satker Pusat Pengembangan Permukiman Penyediaan PS Agropolitan Pelaksanaan Pengembangan Permukiman (Rusunawa) Pembinaan Teknis Penataan Lingkungan Permukiman (NUSSP)
345,524,135 36,263,947 6,791,452 300,468,736 2,000,000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
486479 486485 486491 486505 493336 486511 486686 486520 487723 486536 487732 486432 486448 486454 486460
SATKER PROPINSI Wilayah 1 Pengembangan Kawasan Permukiman & Perbatasan NAD Pengembangan Kawasan Permukiman & Perbatasan Sumatera Utara Pengembangan Kawasan Permukiman Sumatera Barat Pengembangan Kawasan Permukiman & Perbatasan Riau Pengembangan Kawasan Permukiman & Perbatasan Kepulauan Riau Pengembangan Kawasan Permukiman Jambi Pengembangan Kawasan Permukiman Bengkulu Pengembangan Kawasan Permukiman Sumatera Selatan Pengembangan Kawasan Permukiman Bangka Belitung Pengembangan Kawasan Permukiman Lampung Pengembangan Kawasan Permukiman Banten Pengembangan Kawasan Permukiman Jawa Barat Pengembangan Kawasan Permukiman Jawa Tengah Pengembangan Kawasan Permukiman D.I.Yogyakarta Pengembangan Kawasan Permukiman Jawa Timur
553,799,525 268,032,077 16,015,681 19,694,531 19,807,195 17,695,426 17,666,453 12,400,907 14,506,843 19,016,673 12,343,747 14,831,581 15,064,735 21,344,247 27,775,972 13,543,216 26,324,870
486542 486551 486567 486573 486582 487748 486598 486602 452796 486618 486649 486655 486661 486624 486630 486670 493769
Wilayah 2 Pengembangan Kawasan Permukiman & Perbatasan Kalimantan Barat Pengembangan Kawasan Permukiman Kalimantan Tengah Pengembangan Kawasan Permukiman Kalimantan Selatan Pengembangan Kawasan Permukiman & Perbatasan Kalimantan Timur Pengembangan Kawasan Permukiman & Perbatasan Sulawesi Utara Pengembangan Kawasan Permukiman Gorontalo Pengembangan Kawasan Permukiman Sulawesi Tengah Pengembangan Kawasan Permukiman Sulawesi Selatan Pengembangan Kawasan Permukiman Sulawesi Barat Pengembangan Kawasan Permukiman Sulawesi Tenggara Pengembangan Kawasan Permukiman Bali Pengembangan Kawasan Permukiman Nusa Tenggara Barat Pengembangan Kawasan Permukiman & Perbatasan NTT Pengembangan Kawasan Permukiman & Perbatasan Maluku Pengembangan Kawasan Permukiman & Perbatasan Maluku Utara Pengembangan Kawasan Permukiman & Perbatasan Papua Pengembangan Kawasan Permukiman & Perbatasan Papua Barat
285,767,448 28,503,078 16,187,052 16,309,887 15,987,138 17,405,359 12,910,704 15,364,778 23,813,207 13,778,243 18,469,102 20,534,704 17,595,022 14,757,214 15,863,485 12,259,539 13,326,883 12,702,053
-
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
899,323,660
24,000,000
TOTAL
FISIK (%)
PLN
452771 488822 493181 487760
1 2 3 4
KEUANGAN
REALISASI
24,000,000 -
(RP)
%
DEVIASI KEU.
FISIK
%
%
KEUANGAN
PHLN
TOTAL
13,273,079 13,273,079
34,705,534 15,384,033 1,754,686 3,385,473 14,181,342
9.39 42.42 25.84 1.13 54.54
9.11 46.83 26.71 0.22 54.63
(32,086,649) (109,265) (979,230) (30,010,486) (987,668)
(8.68) (0.30) (14.42) (9.99) (3.80)
218,893,458 104,239,842 5,223,223 7,808,290 5,141,839 5,582,090 6,493,706 6,801,391 6,296,130 3,778,992 3,851,077 10,903,152 10,557,964 10,760,767 8,266,826 6,830,988 5,943,407
39.53 38.89 32.61 39.65 25.96 31.55 36.76 54.85 43.40 19.87 31.20 73.51 70.08 50.42 29.76 50.44 22.58
56.03 55.80 66.20 45.09 37.62 32.24 56.62 63.80 70.34 38.17 46.46 86.03 74.26 67.36 48.17 86.35 47.10
6,556,893 11,097,080 (226,704) 1,264,839 (1,585,594) (493,898) (449,490) 2,666,593 1,290,294 (2,639,736) (779,284) 5,089,450 5,368,861 3,051,967 (1,279,733) 2,102,611 (2,283,098)
1.18 4.14 (1.42) 6.42 (8.01) (2.79) (2.54) 21.50 8.89 (13.88) (6.31) 34.31 35.64 14.30 (4.61) 15.53 (8.67)
-
114,653,616 7,717,342 10,173,372 2,207,761 4,904,919 9,693,346 1,910,219 6,240,306 14,462,643 745,705 9,583,396 6,963,535 4,871,604 3,513,580 11,936,159 4,884,885 8,593,168 6,251,676
40.12 27.08 62.85 13.54 30.68 55.69 14.80 40.61 60.73 5.41 51.89 33.91 27.69 23.81 75.24 39.85 64.48 49.22
56.25 47.61 86.94 15.99 48.49 73.73 21.62 61.02 78.24 61.39 65.37 61.18 30.79 91.27 32.67 70.93 87.45
(4,540,186) 214,433 732,865 (3,791,272) (3,342,633) 3,617,397 (5,249,718) (1,362,707) 2,961,535 (3,735,157) 3,408,785 (3,886,525) (1,793,486) (2,436,091) 5,649,107 1,516,027 1,684,736 1,272,520
(2) 0.75 4.53 (23.25) (20.91) 20.78 (40.66) (8.87) 12.44 (27.11) 18.46 (18.93) (10.19) (16.51) 35.61 12.37 12.64 10.02
13,273,079
253,598,992
27.47
37.25
(25,529,756)
(2.76)
(RP)
%
PERMASALAHAN DAN TINDAK LANJUT PROGRES KEGIATAN TA 2010 DIREKTORAT PENGEMBANGAN PERMUKIMAN STATUS : 29 JULI 2010 PROGRES NO.
SATKER/PROVINSI
KEU %
FISIK %
1
Pelaksanaan Pengembangan Permukiman
1.13
0.22
ALASAN KETERLAMBATAN
TINDAK LANJUT
- Pekerjaan Fisik Rusunawa Kupang (1TB) mengalami - Satker melakukan percepatan dan reschedule ulang rencana ketelambatan dalam proses kontrak sehingga mengalami deviasi penyerapan. dari rencana penyerapan.
KETERANGAN
Sudah Terkontrak
- Pekerjaan Fisik Rusunawa Padang (2TB) mengalami - Satker melakukan percepatan dan reschedule ulang rencana ketelambatan dalam proses kontrak sehingga mengalami deviasi penyerapan. dari rencana penyerapan. - Proses Multiyears dari Ditjen Anggaran yang memakan waktu lama
- Dalam proses pengajuan kembali untuk proses Multiyears
2
Sumatera Selatan
19.87
38.17
- Terdapat 1 paket kegiatan fisik (kumuh perkotaan) yang belum terkontrak: Pembangunan jalan poros dan saluran kawasan kumuh Kel. 3-4, kec. Sebrang Ulu 1, Palembang pagu Rp 1.950.000
- Mempercepat proses kontrak dan pengambilan uang muka
3
Kalimantan Selatan
13.54
15.99
- Dari 14 paket fisik, 11 paket baru terkontrak (sudah mengambil uang muka) dan 3 paket fisik (kumuh perkotaan) masih proses lelang.
- Mempercepat proses kontrak dan pengambilan uang muka
- 20 paket non fisik (DED & Supervisi) sudah kontrak tetapi belum ada penyerapan (termin)
- Segera melakukan pengambilan uang muka dan termin
4
Gorontalo
14.80
21.62
- 1 Paket fisik (kumuh Perkotaan) belum terkontrak: pembangunan jalan lingkungan dan MCK di Desa Moluo, Kec. Kwandang, Kab. Gorontalo Utara, pagu Rp 1.909.200.000
11 Paket fisik sudah terkontrak 2 Juli 2010 (selesai masa sanggah per 25 Juni 2010 surat BPKSDM Tanggal 25 Juni 2010 ; Nomor : HK.0202-KK/960)
Lelang ulang karena peserta tidak memenuhi syarat (hanya 2 peserta)
- 1 Paket fisik Agropolitan sedang proses SKPA: peningkatan jalan usaha tani Ds. Tolango Kws. Anggrek Kab. Gorontalo Utara, pagu Rp 902.918.000 5
Sulawesi Barat
5.41
0.00
Proses "Evaluasi Ulang" sudah selesai dan 15 paket fisik sudah terkontrak
13 paket sudah mengambil uang muka.
RENCANA DAN REALISASI PENYERAPAN DIREKTORAT PENGEMBANGAN PERMUKIMAN TAHUN ANGGARAN 2010 1,000,000
923,324
923,324
900,000 802,035 800,000 695,250
DALAM JUTAAN RUPIAH
700,000 587,157
600,000
PAGU
500,000 424,591
RENCANA
400,000 REALISASI 279,129
300,000
253,599 215,805 168,293192,259 154,348
200,000
100,000
-
39,713 22,77937,958 62,468 9,453 574 1,499 1,76618,333 287 JAN FEB MAR APR 1,023
-
86,530 107,498 89,929
6,464
MEI
JUN BULAN
JUL
AGT
SEP
OKT
NOP
DES
LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010 DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN PAKET > RP 100 JUTA STATUS : 29 JULI 2010, JAM 08.00 WIB PAGU NO
KODE SATKER
NAMA SATUAN KERJA
452780 483690 493217 505137 449582
Satker Pusat Dit PBL Penataan & Revitalisasi Kawasan P2KP-PNPM Rehab. Bangunan Gedung Negara Rehab./Rekon DIY & Jateng
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
1 2 3 4 5
PLN
15,565,000
38,297,556 22,152,599 3,648,212 7,748,600 1,381,500 3,366,645
1,412,500 500,000 400,000 412,500 100,000
216,204,253 10,036,964 11,585,680 15,000,156 16,350,616 9,131,613 15,655,301 17,690,241 11,583,567 11,124,789 8,448,092 8,275,863 10,309,066 19,712,853 21,058,483 15,306,616 14,934,353
376,395,260 19,746,710 23,038,700 21,657,500 3,951,580 3,450,830 2,449,650 6,551,010 8,763,520 5,748,420 6,767,480 14,750,500 4,336,990 57,050,300 110,179,660 39,445,200 48,507,210
592,599,513 29,783,674 34,624,380 36,657,656 20,302,196 12,582,443 18,104,951 24,241,251 20,347,087 16,873,209 15,215,572 23,026,363 14,646,056 76,763,153 131,238,143 54,751,816 63,441,563
407,454,718 21,813,565 25,154,271 23,834,987 5,810,087 5,312,334 4,284,842 8,586,142 10,626,978 7,403,100 8,535,463 16,556,254 5,631,056 59,193,044 112,666,780 41,344,361 50,701,454
5,680,200 170,109 140,000 240,000 420,000 320,000 315,000 220,000 45,000 243,000 505,109 1,500,000 683,246 362,736 516,000
179,464,595 7,800,000 9,330,109 12,582,669 14,072,109 7,270,109 13,500,109 15,340,109 9,500,109 9,425,109 6,437,109 5,965,000 9,015,000 16,070,109 17,888,117 13,044,719 12,224,109
228,042,513 13,949,149 18,152,334 15,447,817 12,088,156 10,417,304 11,923,411 12,939,961 15,322,796 9,156,627 14,796,317 13,757,857 12,854,000 14,821,959 8,907,780 9,724,390 19,286,865 14,495,790
110,545,760 6,305,340 2,103,550 13,329,120 9,715,010 9,385,380 3,667,430 3,212,900 18,836,370 1,952,430 10,266,910 4,212,900 13,010,960 4,107,330 3,026,570 4,915,900 1,280,650 1,217,010
338,588,273 20,254,489 20,255,884 28,776,937 21,803,166 19,802,684 15,590,841 16,152,861 34,159,166 11,109,057 25,063,227 17,970,757 25,864,960 18,929,289 11,934,350 14,640,290 20,567,515 15,712,800
142,509,722 8,284,380 3,906,815 15,014,828 11,583,057 11,332,575 5,473,471 5,075,752 20,939,057 3,638,948 12,001,598 5,933,648 14,894,851 6,201,223 4,964,241 6,670,181 3,402,406 3,192,691
5,902,724 345,000 280,000 533,000 595,109 1,009,311 270,109 170,109 360,000 179,109 403,759 787,000 245,000 260,000 170,109 170,109 125,000
532,249,922
637,874,300
1,170,124,222
588,261,996
12,995,424
493342 493351 493367 493373 493382 493398 493424 493482 493418 493430 493552 493543 493568 493574 493580 493599
Satker Propinsi PBL Wilayah I PBL NAD PBL Sumatera Utara PBL Sumatera Barat PBL Riau PBL Kepulauan Riau PBL Jambi PBL Bengkulu PBL Sumatera Selatan PBL Bangka Belitung PBL Lampung PBL Banten PBL DKI Jakarta PBL Jawa Barat PBL Jawa Tengah PBL D.I.Yogyakarta PBL Jawa Timur
493600 493625 493619 493631 493775 493781 493790 493801 452800 493810 493826 493832 493841 493857 493863 493872 493888
PBL Wilayah II PBL Kalimantan Barat PBL Kalimantan Tengah PBL Kalimantan Selatan PBL Kalimantan Timur PBL Sulawesi Utara PBL Gorontalo PBL Sulawesi Tengah PBL Sulawesi Selatan PBL Sulawesi Barat PBL Sulawesi Tenggara PBL Bali PBL NTB PBL NTT PBL Maluku PBL Maluku Utara PBL Papua PBL Papua Barat
6 7 8 9 10
135,368,280
Pemasukan Penawaran Usulan Pemenang Penetapan Pemenang Penerbitan Surat Perintah Mulai Kerja Penandatangan Kontrak
PAKET KONTRAK
KONTRAKTUAL > 100 JT
238,936,436 40,754,374 22,493,537 145,056,880 10,350,000 20,281,645
150,933,280 -
Keterangan : Penyiapan Dokumen Lelang Pengumuman Lelang/Prakualifikasi Penyusunan shortlist Undangan Pelelangan Penjelasan Pekerjaan Aanwyzing
TOTAL
SWAKELOLA + KONTRAKTUAL AP ≤ 100 JT
RPM 48,293,100 18,101,775 18,445,325 1,940,000 8,556,000 1,250,000
88,003,156 40,754,374 22,493,537 9,688,600 10,350,000 4,716,645
TOTAL
1 2 3 4 5
RUPIAH MURNI
PAGU (Rp)
PHLN 150,933,280 135,368,280 15,565,000 -
TOTAL 199,226,380 18,101,775 18,445,325 137,308,280 8,556,000 16,815,000
-
179,464,595 7,800,000 9,330,109 12,582,669 14,072,109 7,270,109 13,500,109 15,340,109 9,500,109 9,425,109 6,437,109 5,965,000 9,015,000 16,070,109 17,888,117 13,044,719 12,224,109
190,175,827 11,625,109 16,069,069 13,229,109 9,625,000 7,460,798 9,847,261 10,907,000 12,860,109 7,291,000 12,657,870 11,250,109 10,725,109 12,468,066 6,800,000 7,800,000 17,165,109 12,395,109
-
190,175,827 11,625,109 16,069,069 13,229,109 9,625,000 7,460,798 9,847,261 10,907,000 12,860,109 7,291,000 12,657,870 11,250,109 10,725,109 12,468,066 6,800,000 7,800,000 17,165,109 12,395,109
417,933,522
150,933,280
568,866,802
BLM -
FISIK TOTAL 7
1
2
79 27 11 30 4 7
9
1
2 5 2
1
1
-
238,936,436 40,754,374 22,493,537 145,056,880 10,350,000 20,281,645
72 27 7 30 1 7
592,599,513 29,783,674 34,624,380 36,657,656 20,302,196 12,582,443 18,104,951 24,241,251 20,347,087 16,873,209 15,215,572 23,026,363 14,646,056 76,763,153 131,238,143 54,751,816 63,441,563
129 5 9 9 7 8 8 8 9 9 7 7 4 11 9 9 10
101 4 8 6 5 4 6 12 6 3 3 4 4 9 12 8 7
230 9 17 15 12 12 14 20 15 12 10 11 8 20 21 17 17
3
-
338,588,273 20,254,489 20,255,884 28,776,937 21,803,166 19,802,684 15,590,841 16,152,861 34,159,166 11,109,057 25,063,227 17,970,757 25,864,960 18,929,289 11,934,350 14,640,290 20,567,515 15,712,800
127 7 10 8 8 7 7 7 9 7 7 5 7 8 7 7 8 8
92 5 6 6 4 10 5 4 5 5 6 6 5 5 4 4 8 4
219 12 16 14 12 17 12 11 14 12 13 11 12 13 11 11 16 12
-
1,170,124,222
328
200
528
12
-
-
TOTAL
NON FISIK
JUMLAH PAKET DALAM PROSES PRA KONTRAK
4 3 -
3 -
5
4
5
6
2
2
1
2
2
1
1
11
-
7 -
1
8
9
1
1
1
1
-
3
1
1
1
1
1
3 4 3 7
2
1 -
-
-
-
-
-
2
4
1
2 3
2
5
3
13
1
1
3
8
NILAI KONTRAK 10 (Rp. x 1.000) 62 27 3 23 2 7
155,512,639 16,559,221 1,353,200 114,919,905 5,865,313 16,815,000
205 9 17 13 10 11 14 20 15 9 10 11 4 15 14 17 16
132,569,780 6,779,706 9,092,056 7,584,310 9,307,111 5,829,976 13,053,431 15,178,929 9,312,948 6,051,128 6,301,061 5,735,683 1,413,434 7,098,381 8,717,997 10,371,625 10,742,004
213 12 16 14 12 17 11 11 14 12 13 11 10 13 11 8 16 12
168,461,097 11,471,907 15,178,089 10,339,176 8,982,705 7,255,385 8,374,072 10,618,034 11,176,898 6,912,158 12,514,833 8,498,766 6,068,948 12,002,231 6,704,912 3,256,269 16,786,523 12,320,191
480
456,543,516
RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010 DI LINGKUNGAN DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN STATUS : 29 JULI 2010, JAM 08.00 NO.
URAIAN PERMASALAHAN
TINDAK LANJUT
PAKET > 100 Juta
1 Persiapan Lelang
10
-
2 Proses Lelang
35
-
3 Sanggah Banding
0
-
4 Tender Ulang
0
-
5
0
-
Review DED
6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran a. Loan belum efektif b. Menunggu Penandatanganan Loan Agreement c. Tanggap Darurat d. Revisi Kegiatan
e. Belum tersedia dokumen RPIJM f. Menunggu persyaratan pembuktian BMN 7 Pemindahan Lokasi TOTAL
0 0 0 3
Penataan dan Revitalisasi Kawasan : 1 Supervisi Penataan dan Revitalisasi Kawasan Kota Pacitan 2 Pelaksanaan Penataan dan Revitalisasi Kawasan Kota Pacitan 3 Penataan dan Revitalisasi Kawasan Kota Lama Sawahlunto
0 0
-
0
-
48
KETERANGAN
No 1 dan 2 : Menunggu arahan Menteri Pekerjaan No. 3 : Sedang dalam proses lelang, posisi aanwizjin (no.5).
PERMASALAHAN PAKET BELUM LELANG DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN > 100 JUTA STATUS : 29 JULI 2010, JAM 08.00 NO
1
SATKER/PROVINSI
PENATAAN DAN REVITALISASI KAWASAN
JML PAKET BELUM LELANG
2
PAKET KONTRAK/RINCIAN KEGIATAN
1 Supervisi Penataan dan Revitalisasi Kawasan Kota Pacitan
2 Pelaksanaan Penataan dan Revitalisasi Kawasan Kota Pacitan 2
PENANGGULANGAN KEMISKINAN DI PERKOTAAN
5
1 Evaluation Consultant - Baseline ND 2 Evaluation Consultant - Impact PAKET 3 Evaluation Consultant - Kelembagaan BKM Indikator Pengukuran Kinerja 4 Konsultan Evaluasi IDB PNPM 2
5 Good and Service Advance
3
PENATAAN BANGUNAN DAN LINGKUNGAN BANGKA BELITUNG
3
1 DUKUNGAN PSD KWS. TRADISIONAL KEL. KUTO PANJI KEC. BELINYU
2 DUKUNGAN PRASARANA DAN SARANA RUANG TERBUKA HIJAU KEL. SRI MENANTI KEC. SUNGAILIAT
3 PENDAMPINGAN FISIK TRADISIONAL
PAGU (X Rp.1000)
PENJELASAN BELUM LELANG
TINDAK LANJUT
160.000 No. 1 s/d 2 : telah dikirimkan memo dinas Direktur Jenderal Cipta Karya kepada Menteri Pekerjaan Umum perihal Galeri Kota Pacitan, Nomor : 46/MDDC/2010, tanggal 7 Juli 2010. 5,220.000
Menunggu arahan Menteri Pekerjaan Umum.
1,150.402 No. 1 s/d 3 :Berdasarkan hasil diskusi dengan WB, 3 kajian evaluasi ini akan menggunakan perusahaan 1,134.568 survey untuk pengumpulan data dan konsultan individual untuk analisa sampai pelaporan lelang 2,347.371 hanya untuk perusahaan survey dengan rencana lelang di bulan Oktober.
No. 1 s/d 3 :Percepatan penyelesaian dan pembahasan TOR dan dokumen lelang dengan WB.
500.000 No. 4 : Berdasarkan midterm yang baru akan No.4 : Berdasarkan hasil dilaksanakan setelah 6 bulan masa pelaksanaan, supervisi IDB, disepakati diperkirakan lelang dilaksanakan di bulan November kegiatan ini masuk dalam 2010. lingkup pekerjaan baseline survey yang statusnya saat ini adalah penetapan pemenang (no.8). 10,000.000 No. 5 : Menunggu WB mengumumkan di UNDP dan No. 5 : Sudah DG's Market. pengumuman lelang, tinggal update emonitoring (masuk no.2)
2.000.000 No. 1 dan 2 : Masih menunggu kesepakatan lokasi dengan Pemda (Bappeda Kab. Bangka), dimana lokasi yang ditetapkan oleh Bappeda kab. Bangka tidak masuk dalam 4 pilihan lokasi perencanaan RTH 750.000 dan tidak memenuhi kriteria kawasan tradisional.
125.109 Mengikuti pekerjaan fisik
Pada tanggal 13 Juli 2010, Kepala Dinas Pekerjaan Umum Prov. Bangka Belitung telah melayangkan surat ke Bupati Bangka untuk menjelaskan permasalahan tersebut.
NO
SATKER/PROVINSI
4 REHABILITASI DAN PEMBANGUNAN GEDUNG NEGARA
TOTAL
JML PAKET BELUM LELANG 2
12
PAKET KONTRAK/RINCIAN KEGIATAN
1 Lanjutan Revitalisasi Kompleks Perkantoran Cipta Karya Werdha Pura Sanur Bali 2 Rehabilitasi Gedung Kantor Cipta Karya (Ruang Kerja Subdit PGRN) dan Rumah Dinas
PAGU (X Rp.1000)
PENJELASAN BELUM LELANG
2.200.000 No. 1 : Menunggu revisi DIPA 489.500 No. 2 : Minggu ke-4 Juni akan dilakukan pengumuman lelang. 21,876.950
TINDAK LANJUT
LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010 DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN STATUS : 29 JULI 2010, JAM 08.00 WIB PAGU
NO
KODE SATKER
1 2 3 4 5
452780 483690 493217 505137 449582
Satker Pusat Dit PBL Penataan & Revitalisasi Kawasan P2KP-PNPM Rehab. Bangunan Gedung Negara Rehab./Rekon DIY & Jateng
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
NAMA SATUAN KERJA
RUPIAH MURNI
PLN
TOTAL
SWAKELOLA + KONTRAKTUAL AP ≤ 100 JT
PAGU (Rp) KONTRAKTUAL > 100 JT RPM PHLN TOTAL
88,003,156 40,754,374 22,493,537 9,688,600 10,350,000 4,716,645
150,933,280 135,368,280 15,565,000
238,936,436 40,754,374 22,493,537 145,056,880 10,350,000 20,281,645
38,297,556 22,152,599 3,648,212 7,748,600 1,381,500 3,366,645
1,412,500 500,000 400,000 412,500 100,000
48,293,100 18,101,775 18,445,325 1,940,000 8,556,000 1,250,000
493342 493351 493367 493373 493382 493398 493424 493482 493418 493430 493552 493543 493568 493574 493580 493599
Satker Propinsi PBL Wilayah I PBL NAD PBL Sumatera Utara PBL Sumatera Barat PBL Riau PBL Kepulauan Riau PBL Jambi PBL Bengkulu PBL Sumatera Selatan PBL Bangka Belitung PBL Lampung PBL Banten PBL DKI Jakarta PBL Jawa Barat PBL Jawa Tengah PBL D.I.Yogyakarta PBL Jawa Timur
216,204,253 10,036,964 11,585,680 15,000,156 16,350,616 9,131,613 15,655,301 17,690,241 11,583,567 11,124,789 8,448,092 8,275,863 10,309,066 19,712,853 21,058,483 15,306,616 14,934,353
376,395,260 19,746,710 23,038,700 21,657,500 3,951,580 3,450,830 2,449,650 6,551,010 8,763,520 5,748,420 6,767,480 14,750,500 4,336,990 57,050,300 110,179,660 39,445,200 48,507,210
592,599,513 29,783,674 34,624,380 36,657,656 20,302,196 12,582,443 18,104,951 24,241,251 20,347,087 16,873,209 15,215,572 23,026,363 14,646,056 76,763,153 131,238,143 54,751,816 63,441,563
407,454,718 21,813,565 25,154,271 23,834,987 5,810,087 5,312,334 4,284,842 8,586,142 10,626,978 7,403,100 8,535,463 16,556,254 5,631,056 59,193,044 112,666,780 41,344,361 50,701,454
5,680,200 170,109 140,000 240,000 420,000 320,000 315,000 220,000 45,000 243,000 505,109 1,500,000 683,246 362,736 516,000
179,464,595 7,800,000 9,330,109 12,582,669 14,072,109 7,270,109 13,500,109 15,340,109 9,500,109 9,425,109 6,437,109 5,965,000 9,015,000 16,070,109 17,888,117 13,044,719 12,224,109
493600 493625 493619 493631 493775 493781 493790 493801 452800 493810 493826 493832 493841 493857 493863 493872 493888
PBL Wilayah II PBL Kalimantan Barat PBL Kalimantan Tengah PBL Kalimantan Selatan PBL Kalimantan Timur PBL Sulawesi Utara PBL Gorontalo PBL Sulawesi Tengah PBL Sulawesi Selatan PBL Sulawesi Barat PBL Sulawesi Tenggara PBL Bali PBL NTB PBL NTT PBL Maluku PBL Maluku Utara PBL Papua PBL Papua Barat
228,042,513 13,949,149 18,152,334 15,447,817 12,088,156 10,417,304 11,923,411 12,939,961 15,322,796 9,156,627 14,796,317 13,757,857 12,854,000 14,821,959 8,907,780 9,724,390 19,286,865 14,495,790
110,545,760 6,305,340 2,103,550 13,329,120 9,715,010 9,385,380 3,667,430 3,212,900 18,836,370 1,952,430 10,266,910 4,212,900 13,010,960 4,107,330 3,026,570 4,915,900 1,280,650 1,217,010
338,588,273 20,254,489 20,255,884 28,776,937 21,803,166 19,802,684 15,590,841 16,152,861 34,159,166 11,109,057 25,063,227 17,970,757 25,864,960 18,929,289 11,934,350 14,640,290 20,567,515 15,712,800
142,509,722 8,284,380 3,906,815 15,014,828 11,583,057 11,332,575 5,473,471 5,075,752 20,939,057 3,638,948 12,001,598 5,933,648 14,894,851 6,201,223 4,964,241 6,670,181 3,402,406 3,192,691
5,902,724 345,000 280,000 533,000 595,109 1,009,311 270,109 170,109 360,000 179,109 403,759 787,000 245,000 260,000 170,109 170,109 125,000
532,249,922
637,874,300
1,170,124,222
588,261,996
12,995,424
TOTAL
150,933,280 135,368,280 15,565,000
PAGU TERKONTRAK BLM
199,226,380 18,101,775 18,445,325 137,308,280 8,556,000 16,815,000
-
179,464,595 7,800,000 9,330,109 12,582,669 14,072,109 7,270,109 13,500,109 15,340,109 9,500,109 9,425,109 6,437,109 5,965,000 9,015,000 16,070,109 17,888,117 13,044,719 12,224,109
-
-
190,175,827 11,625,109 16,069,069 13,229,109 9,625,000 7,460,798 9,847,261 10,907,000 12,860,109 7,291,000 12,657,870 11,250,109 10,725,109 12,468,066 6,800,000 7,800,000 17,165,109 12,395,109
-
190,175,827 11,625,109 16,069,069 13,229,109 9,625,000 7,460,798 9,847,261 10,907,000 12,860,109 7,291,000 12,657,870 11,250,109 10,725,109 12,468,066 6,800,000 7,800,000 17,165,109 12,395,109
417,933,522
150,933,280
568,866,802
-
-
TOTAL
RPM
PHLN
TOTAL
128,544,905 112,979,905 15,565,000
157,393,005 18,101,775 1,525,325 114,919,905 6,031,000 16,815,000
26,967,734 16,559,221 1,353,200 1,940,000 5,865,313 1,250,000
-
145,996,470 7,800,000 9,330,109 9,148,812 10,650,109 6,770,109 13,500,109 15,340,109 9,500,109 6,550,000 6,437,109 5,865,000 1,550,000 8,036,000 10,450,067 13,044,719 12,024,109
132,569,780 6,779,706 9,092,056 7,584,310 9,307,111 5,829,976 13,053,431 15,178,929 9,312,948 6,051,128 6,301,061 5,735,683 1,413,434 7,098,381 8,717,997 10,371,625 10,742,004
-
182,166,827 11,625,109 16,069,069 13,229,109 9,625,000 7,360,798 9,347,261 10,907,000 12,860,109 7,291,000 12,657,870 11,250,109 7,975,109 12,468,066 6,800,000 3,300,000 17,006,109 12,395,109
168,461,097 11,471,907 15,178,089 10,339,176 8,982,705 7,255,385 8,374,072 10,618,034 11,176,898 6,912,158 12,514,833 8,498,766 6,068,948 12,002,231 6,704,912 3,256,269 16,786,523 12,320,191
-
485,556,302
327,998,611
-
238,936,436 40,754,374 22,493,537 145,056,880 10,350,000 20,281,645
28,848,100 18,101,775 1,525,325 1,940,000 6,031,000 1,250,000
-
592,599,513 29,783,674 34,624,380 36,657,656 20,302,196 12,582,443 18,104,951 24,241,251 20,347,087 16,873,209 15,215,572 23,026,363 14,646,056 76,763,153 131,238,143 54,751,816 63,441,563
145,996,470 7,800,000 9,330,109 9,148,812 10,650,109 6,770,109 13,500,109 15,340,109 9,500,109 6,550,000 6,437,109 5,865,000 1,550,000 8,036,000 10,450,067 13,044,719 12,024,109
-
-
338,588,273 20,254,489 20,255,884 28,776,937 21,803,166 19,802,684 15,590,841 16,152,861 34,159,166 11,109,057 25,063,227 17,970,757 25,864,960 18,929,289 11,934,350 14,640,290 20,567,515 15,712,800
182,166,827 11,625,109 16,069,069 13,229,109 9,625,000 7,360,798 9,347,261 10,907,000 12,860,109 7,291,000 12,657,870 11,250,109 7,975,109 12,468,066 6,800,000 3,300,000 17,006,109 12,395,109
-
1,170,124,222
357,011,397
-
128,544,905
( x Rp. 1.000 ) SISA PAGU KONTRAK
NILAI KONTRAK RPM
PHLN
TOTAL
RPM
PHLN
TOTAL
128,544,905 112,979,905 15,565,000
155,512,639 16,559,221 1,353,200 114,919,905 5,865,313 16,815,000
1,880,366 1,542,554 172,125 165,687 -
-
1,880,366 1,542,554 172,125 165,687 -
-
132,569,780 6,779,706 9,092,056 7,584,310 9,307,111 5,829,976 13,053,431 15,178,929 9,312,948 6,051,128 6,301,061 5,735,683 1,413,434 7,098,381 8,717,997 10,371,625 10,742,004
13,426,690 1,020,294 238,053 1,564,502 1,342,998 940,133 446,678 161,180 187,161 498,872 136,048 129,317 136,566 937,619 1,732,070 2,673,094 1,282,105
-
13,426,690 1,020,294 238,053 1,564,502 1,342,998 940,133 446,678 161,180 187,161 498,872 136,048 129,317 136,566 937,619 1,732,070 2,673,094 1,282,105
-
168,461,097 11,471,907 15,178,089 10,339,176 8,982,705 7,255,385 8,374,072 10,618,034 11,176,898 6,912,158 12,514,833 8,498,766 6,068,948 12,002,231 6,704,912 3,256,269 16,786,523 12,320,191
13,705,730 153,202 890,980 2,889,933 642,295 105,413 973,189 288,966 1,683,211 378,842 143,037 2,751,343 1,906,161 465,835 95,088 43,731 219,586 74,918
-
13,705,730 153,202 890,980 2,889,933 642,295 105,413 973,189 288,966 1,683,211 378,842 143,037 2,751,343 1,906,161 465,835 95,088 43,731 219,586 74,918
128,544,905
456,543,516
29,012,786
-
29,012,786
RENCANA PENYERAPAN DAN PROGRES KEUANGAN DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN STATUS : 29 JULI 2010, JAM 08.00 WIB ( X Rp. 1000 )
NO
KODE SATKER
PAGU NAMA SATUAN KERJA RUPIAH MURNI
452780 483690 493217 505137 449582
Satker Pusat Direktorat Penataan Bangunan & Lingkungan Penataan & Revitalisasi Kawasan Penanggulangan Kemiskinan di Perkotaan (P2KP-PNPM) Rehabilitasi dan Pembangunan Gedung Negara Rehab./Rekon Rumah Pasca Gempa Bumi DIY & Jateng
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
1 2 3 4 5
RENCANA PENYERAPAN AKHIR BULAN JULI
PLN
88,003,156 40,754,374 22,493,537 9,688,600 10,350,000 4,716,645
150,933,280 -
493342 493351 493367 493373 493382 493398 493424 493482 493418 493430 493552 493543 493568 493574 493580 493599
Satker Propinsi PBL Wilayah I Penataan Bangunan & Lingkungan NAD Penataan Bangunan & Lingkungan Sumatera Utara Penataan Bangunan & Lingkungan Sumatera Barat Penataan Bangunan & Lingkungan Riau Penataan Bangunan & Lingkungan Kepulauan Riau Penataan Bangunan & Lingkungan Jambi Penataan Bangunan & Lingkungan Bengkulu Penataan Bangunan & Lingkungan Sumatera Selatan Penataan Bangunan & Lingkungan Bangka Belitung Penataan Bangunan & Lingkungan Lampung Penataan Bangunan & Lingkungan Banten Penataan Bangunan & Lingkungan DKI Jakarta Penataan Bangunan & Lingkungan Jawa Barat Penataan Bangunan & Lingkungan Jawa Tengah Penataan Bangunan & Lingkungan D.I.Yogyakarta Penataan Bangunan & Lingkungan Jawa Timur
493600 493625 493619 493631 493775 493781 493790 493801 452800 493810 493826 493832 493841 493857 493863 493872 493888
PBL Wilayah II Penataan Bangunan & Lingkungan Kalimantan Barat Penataan Bangunan & Lingkungan Kalimantan Tengah Penataan Bangunan & Lingkungan Kalimantan Selatan Penataan Bangunan & Lingkungan Kalimantan Timur Penataan Bangunan & Lingkungan Sulawesi Utara Penataan Bangunan & Lingkungan Gorontalo Penataan Bangunan & Lingkungan Sulawesi Tengah Penataan Bangunan & Lingkungan Sulawesi Selatan Penataan Bangunan & Lingkungan Sulawesi Barat Penataan Bangunan & Lingkungan Sulawesi Tenggara Penataan Bangunan & Lingkungan Bali Penataan Bangunan & Lingkungan NTB Penataan Bangunan & Lingkungan NTT Penataan Bangunan & Lingkungan Maluku Penataan Bangunan & Lingkungan Maluku Utara Penataan Bangunan & Lingkungan Papua Penataan Bangunan & Lingkungan Papua Barat TOTAL
TOTAL
KEUANGAN (RP)
%
FISIK (%)
REALISASI RUPIAH MURNI
DEVIASI
PHLN
TOTAL
KEU.
FISIK
%
%
KEUANGAN (RP)
%
15,565,000
238,936,436 40,754,374 22,493,537 145,056,880 10,350,000 20,281,645
83,084,732 13,815,965 5,629,644 53,232,560 2,416,990 7,989,573
34.77 33.90 25.03 36.70 23.35 39.39
48.74 44.90 60.03 46.73 56.35 54.40
18,978,974 10,986,100 701,484 3,738,419 2,046,305 1,506,666
58,669,852 53,235,490 5,434,362
77,648,826 10,986,100 701,484 56,973,909 2,046,305 6,941,028
32.50 26.96 3.12 39.28 19.77 34.22
33.36 29.41 6.25 39.28 20.10 35.79
(5,435,906) (2,829,865) (4,928,160) 3,741,349 (370,685) (1,048,545)
(2.28) (6.94) (21.91) 2.58 (3.58) (5.17)
216,204,253 10,036,964 11,585,680 15,000,156 16,350,616 9,131,613 15,655,301 17,690,241 11,583,567 11,124,789 8,448,092 8,275,863 10,309,066 19,712,853 21,058,483 15,306,616 14,934,353
376,395,260 19,746,710 23,038,700 21,657,500 3,951,580 3,450,830 2,449,650 6,551,010 8,763,520 5,748,420 6,767,480 14,750,500 4,336,990 57,050,300 110,179,660 39,445,200 48,507,210
592,599,513 29,783,674 34,624,380 36,657,656 20,302,196 12,582,443 18,104,951 24,241,251 20,347,087 16,873,209 15,215,572 23,026,363 14,646,056 76,763,153 131,238,143 54,751,816 63,441,563
236,719,794 10,928,149 16,667,783 13,150,149 9,147,358 5,296,701 8,235,243 10,562,096 8,482,110 6,583,762 5,757,675 8,352,463 6,567,943 34,239,691 46,179,273 17,285,499 29,283,898
39.95 36.69 48.14 35.87 45.06 42.10 45.49 43.57 41.69 39.02 37.84 36.27 44.84 44.60 35.19 31.57 46.16
64.11 61.69 64.79 61.05 70.06 67.10 70.49 68.49 66.69 64.02 62.84 61.28 69.85 58.94 64.14 69.87 61.11
57,338,776 2,046,136 6,898,346 2,831,974 3,143,239 2,060,151 6,074,605 6,536,398 3,201,381 2,275,398 3,988,245 2,579,263 265,805 2,318,824 2,862,476 4,010,439 6,246,096
135,444,704 5,853,714 8,608,535 4,814,234 1,657,300 1,459,800 918,013 1,670,400 3,275,144 1,078,394 1,756,050 5,070,976 3,990,786 19,625,812 28,733,025 23,201,164 23,731,357
192,783,480 7,899,850 15,506,881 7,646,208 4,800,539 3,519,951 6,992,618 8,206,798 6,476,525 3,353,792 5,744,295 7,650,239 4,256,591 21,944,636 31,595,501 27,211,603 29,977,453
32.53 26.52 44.79 20.86 23.65 27.98 38.62 33.85 31.83 19.88 37.75 33.22 29.06 28.59 24.07 49.70 47.25
35.50 32.59 45.20 21.30 23.96 30.23 43.74 40.90 32.13 20.62 54.34 47.94 29.35 29.01 25.27 55.16 49.61
(43,936,314) (3,028,299) (1,160,902) (5,503,941) (4,346,819) (1,776,750) (1,242,625) (2,355,298) (2,005,585) (3,229,970) (13,380) (702,224) (2,311,352) (12,295,055) (14,583,772) 9,926,104 693,555
(7.41) (10.17) (3.35) (15.01) (21.41) (14.12) (6.86) (9.72) (9.86) (19.14) (0.09) (3.05) (15.78) (16.02) (11.11) 18.13 1.09
228,042,513 13,949,149 18,152,334 15,447,817 12,088,156 10,417,304 11,923,411 12,939,961 15,322,796 9,156,627 14,796,317 13,757,857 12,854,000 14,821,959 8,907,780 9,724,390 19,286,865 14,495,790
110,545,760 6,305,340 2,103,550 13,329,120 9,715,010 9,385,380 3,667,430 3,212,900 18,836,370 1,952,430 10,266,910 4,212,900 13,010,960 4,107,330 3,026,570 4,915,900 1,280,650 1,217,010
338,588,273 20,254,489 20,255,884 28,776,937 21,803,166 19,802,684 15,590,841 16,152,861 34,159,166 11,109,057 25,063,227 17,970,757 25,864,960 18,929,289 11,934,350 14,640,290 20,567,515 15,712,800
144,721,504 8,157,456 9,103,443 10,713,058 8,362,790 9,592,750 6,396,613 6,746,331 14,525,432 4,792,034 9,446,261 8,155,994 10,814,462 8,336,404 4,983,341 6,169,625 10,466,467 7,959,043
42.74 40.27 44.94 37.23 38.36 48.44 41.03 41.77 42.52 43.14 37.69 45.38 41.81 44.04 41.76 42.14 50.89 50.65
60.74 60.28 64.94 47.23 58.36 59.39 61.03 61.77 51.12 63.14 57.69 65.44 56.08 64.04 61.76 62.14 66.74 96.87
74,581,003 4,751,530 6,025,032 2,962,691 2,749,766 4,232,714 2,772,349 4,547,177 3,451,719 2,328,187 3,546,870 3,494,625 3,170,506 2,982,048 3,663,623 1,506,589 8,928,626 13,466,951
33,263,806 2,679,900 606,720 3,345,326 1,779,887 4,380,916 899,032 911,950 5,600,058 502,400 1,816,015 1,345,200 3,490,988 1,569,321 1,229,858 2,059,785 566,000 480,450
107,844,809 7,431,430 6,631,752 6,308,017 4,529,653 8,613,630 3,671,381 5,459,127 9,051,777 2,830,587 5,362,885 4,839,825 6,661,494 4,551,369 4,893,481 3,566,374 9,494,626 13,947,401
31.85 36.69 32.74 21.92 20.78 43.50 23.55 33.80 26.50 25.48 21.40 26.93 25.75 24.04 41.00 24.36 46.16 88.76
39.87 39.06 58.96 33.12 23.34 50.19 27.74 31.28 27.15 33.08 31.62 47.49 27.81 26.05 66.67 25.13 66.54 91.24
(36,876,695) (726,026) (2,471,691) (4,405,041) (3,833,137) (979,120) (2,725,232) (1,287,204) (5,473,655) (1,961,447) (4,083,376) (3,316,169) (4,152,968) (3,785,035) (89,860) (2,603,251) (971,841) 5,988,358
(10.89) (3.58) (12.20) (15.31) (17.58) (4.94) (17.48) (7.97) (16.02) (17.66) (16.29) (18.45) (16.06) (20.00) (0.75) (17.78) (4.73) 38.11
532,249,922
637,874,300
1,170,124,222
464,526,030
39.70
60.00
150,898,753
227,378,362
378,277,115
32.33
36.33
(86,248,915)
(7.37)
135,368,280
PERMASALAHAN DAN TINDAK LANJUT PROGRES KEGIATAN TA 2010 DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN STATUS : 29 JULI 2010, JAM 08.00 WIB NO
SATKER
1 Penataan dan Revitalisasi Kawasan
PROGRES KEU FISIK % % 3.12
ALASAN KETERLAMBATAN
6.25 1 3 paket pekerjaan DED Sawahlunto, Design Kawasan Pacitan dan Fisik Masjid Surabaya lelang ulang.
TINDAK LANJUT
KETERANGAN
Dokumen tagihan siap, setalah revisi POK, langsung proses.
2 Revisi POK sudah di Dit. Bina Program. 2 Rehabilitasi dan Pembangunan Gedung Negara
19.77
20.10
3
Penataan Bangunan & Lingkungan Bangka Belitung
19.88
20.62 Penetapan Lokasi RTH dan Tradisional masih mengalami Akan diadakan rapat dengan pihak hambatan, belum adanya kesepakatan dengan pemerintah Pemda, jika masih mengalami daerah (Bappeda) kendala kemungkinan akan ada pemindahan lokasi
4
Penataan Bangunan & Lingkungan Kalimantan Selatan
21.92
33.12 Dana P2KP untuk PAKET dan ND baru bisa cair bulan November (lebih kurang 6,8M)
20.78
23.34
5 Penataan Bangunan & Lingkungan Kalimantan Timur
Status tanggal 29 Juli 2010 jam , keuangan
DDUB untuk PAKET dalam proses ABT di kab/Kota-nya.
1 Status per tanggal 29 Juli 2010 jam 11.26 sudah mencapai keuangan 29,18, dan fisik 31,04. 2 Pembayaran Fixed cost P2KP yang direncanakan cair Menunggu proses inventarisasi pada bulan Juli 2010 terkendala dengan belum laporan fixed cost. terbitnya SK yang memuat perhitungan dana fixed cost. Fixed Cost akan diproses setelah infentarisasi laporan fixed cost 2009 diselesaikan.
6
Penataan Bangunan & Lingkungan Sulawesi Tenggara
21.40
31.62 PAKET dan ND P2KP belum cair. Khusus untuk ND, pencairan baru bisa dilaksanakan bulan September.
Untuk PAKET, menunggu rekomendasi pencairan dari Satker P2KP Pusat.
RENCANA DAN REALISASI PENYERAPAN DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN TAHUN ANGGARAN 2010 1,400,000
1,170,124
1,170,124 1,200,000 1,110,097
954,704
DALAM JUTAAN RUPIAH
1,000,000
809,843 800,000 654,685
PAGU
600,000
RENCANA 464,526
REALISASI 400,000
334,251
200,000
130,482
378,277 331,015 286,090 217,864 258,717 206,967 160,172
72,030
-
96,536 128,269 47,03773,717 21,219 17,998 418 837 JAN FEB MAR APR -
30,072
MEI
JUN BULAN
JUL
AGT
SEP
OKT
NOP
DES
LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010 DIREKTORAT BINA PROGRAM PAKET > RP 100 JUTA STATUS : 29 JULI 2010, JAM 08.00 WIB NO
KODE SATKER
PLN
TOTAL
466162 505138
Satker Pusat Dit Bina Program Pembinaan Infrastruktur Perdesaan
397,375,532 66,532,332 330,843,200
148,471,500 10,000,000 138,471,500
545,847,032 76,532,332 469,314,700
397,857,324 42,289,224 355,568,100
467,500 300,000 167,500
45,484,188 24,043,108 21,441,080
102,038,020 9,900,000 92,138,020
147,522,208 33,943,108 113,579,100
505730 505749 505755 505761 505097 505786 505100 505770 505792 505821 505840 505837 505843 505868 505101 505106 505993 505107 505874 505880 505899 505900 505104 505940 505931 505102 505105 505103 505108 505110 506022 506038
Satker Propinsi PIP Nanggroe Aceh Darussalam PIP Sumatera Utara PIP Sumatera Barat PIP Riau PIP Kepri PIP Sumatera Selatan PIP Bangka Belitung PIP Jambi PIP Bengkulu PIP Lampung PIP Banten PIP Jawa Barat PIP Jawa Tengah PIP Jawa Timur PIP DI Yogyakarta PIP Bali PIP Nusa Tenggara Timur PIP NTB PIP Kalimantan Barat PIP Kalimantan Tengah PIP Kalimantan Selatan PIP Kalimantan Timur PIP Sulawesi Barat PIP Sulawesi Selatan PIP Sulawesi Tengah PIP Sulawesi Utara PIP Sulawesi Tenggara PIP Gorontalo PIP Maluku PIP Maluku Utara PIP Papua PIP Papua Barat
143,567,000 2,916,000 1,910,000 3,649,152 16,343,000 1,036,000 14,612,288 1,213,000 7,263,000 2,917,000 12,503,000 2,442,000 6,823,000 5,941,000 7,545,000 941,000 1,077,000 5,676,000 2,806,000 3,844,000 3,036,424 3,738,136 3,753,000 2,294,000 6,851,000 2,718,000 3,243,000 3,353,000 2,434,000 3,612,000 1,120,000 4,518,000 1,439,000
-
143,567,000 2,916,000 1,910,000 3,649,152 16,343,000 1,036,000 14,612,288 1,213,000 7,263,000 2,917,000 12,503,000 2,442,000 6,823,000 5,941,000 7,545,000 941,000 1,077,000 5,676,000 2,806,000 3,844,000 3,036,424 3,738,136 3,753,000 2,294,000 6,851,000 2,718,000 3,243,000 3,353,000 2,434,000 3,612,000 1,120,000 4,518,000 1,439,000
119,593,282 2,316,000 1,870,000 2,832,912 16,303,000 1,036,000 14,612,288 1,213,000 7,223,000 2,067,000 12,503,000 1,804,000 4,461,350 4,181,000 5,030,000 941,000 1,037,000 4,031,600 2,046,000 2,960,800 2,316,424 2,599,216 2,825,000 1,613,000 4,656,300 1,624,000 2,443,000 2,533,000 1,794,000 2,638,392 1,120,000 3,523,000 1,439,000
591,400 40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 191,400 40,000 40,000 -
23,382,318 600,000 816,240 810,000 638,000 2,361,650 1,760,000 2,475,000 1,604,400 720,000 883,200 720,000 947,520 928,000 641,000 2,194,700 1,094,000 800,000 820,000 600,000 973,608 995,000 -
-
TOTAL
540,942,532
148,471,500
689,414,032
517,450,606
1,058,900
68,866,506
102,038,020
Keterangan : Penyiapan Dokumen Lelang Pengumuman Lelang/Prakualifikasi Penyusunan shortlist Undangan Pelelangan Penjelasan Pekerjaan Aanwyzing
6 7 8 9 10
a.
b.
1 2 3 4 5
PAGU (Rp) KONTRAKTUAL > 100 JT RPM PHLN TOTAL
RUPIAH MURNI
1 2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
PAGU NAMA SATUAN KERJA
SWAKELOLA KONTRAKTUAL + AP ≤ 100 JT
Pemasukan Penawaran Usulan Pemenang Penetapan Pemenang Penerbitan Surat Perintah Mulai Kerja Penandatangan Kontrak
PAKET KONTRAK NON FISIK TOTAL FISIK
BLM
TOTAL
-
545,847,032 76,532,332 469,314,700
80 32 48
2 1 1
82 33 49
23,382,318 600,000 816,240 810,000 638,000 2,361,650 1,760,000 2,475,000 1,604,400 720,000 883,200 720,000 947,520 928,000 641,000 2,194,700 1,094,000 800,000 820,000 600,000 973,608 995,000 -
-
143,567,000 2,916,000 1,910,000 3,649,152 16,343,000 1,036,000 14,612,288 1,213,000 7,263,000 2,917,000 12,503,000 2,442,000 6,823,000 5,941,000 7,545,000 941,000 1,077,000 5,676,000 2,806,000 3,844,000 3,036,424 3,738,136 3,753,000 2,294,000 6,851,000 2,718,000 3,243,000 3,353,000 2,434,000 3,612,000 1,120,000 4,518,000 1,439,000
30 1 1 1 1 3 2 3 2 1 1 1 1 1 1 3 1 1 1 1 2 1 -
-
30 1 1 1 1 3 2 3 2 1 1 1 1 1 1 3 1 1 1 1 2 1 -
170,904,526
-
689,414,032
110
2
112
JUMLAH PAKET DALAM PROSES PRA KONTRAK 1
2 2 2 -
4
13 13
-
-
-
-
2
3
-
13
-
5
6
-
-
-
-
7 2 2 -
-
2
8
-
9
-
10
-
-
-
-
-
-
-
-
-
NILAI KONTRAK (Rp. x 1.000)
65 29 36
119,943,595 26,516,954 93,426,641
30 1 1 1 1 3 2 3 2 1 1 1 1 1 1 3 1 1 1 1 2 1 -
21,320,772 572,950 815,914 769,835 576,605 2,260,315 1,351,933 2,215,994 1,582,845 496,719 769,037 715,864 911,190 887,480 612,500 2,030,386 665,070 766,590 816,750 562,170 959,400 981,225 -
95
141,264,367
RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010 DI LINGKUNGAN DIREKTORAT BINA PROGRAM STATUS: 29 JULI 2010 NO.
URAIAN PERMASALAHAN
1 Persiapan Lelang
PAKET
2
2 Proses Lelang
15
3 Sanggah Banding
-
4 Tender Ulang
-
5
-
Review DED
6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran a. Loan belum efektif b. Menunggu Penandatanganan Loan Agreement c. Tanggap Darurat d. Revisi Kegiatan e. Belum tersedia dokumen RPIJM f. Menunggu persyaratan pembuktian BMN
-
7 Pemindahan Lokasi
TOTAL
17
TINDAK LANJUT
Satker Bina Program 1. Paket Persentation Room, Adanya perubahan layout desain ruangan 2. Paket LED and Business Plan, KAK baru saja disetujui oleh World Bank
KETERANGAN
Saat ini sedang proses akan memasuki pengumuman lelang Saat ini sedang mengajukan Draft Pengumuman untuk lelang
PERMASALAHAN PAKET BELUM LELANG DIREKTORAT BINA PROGRAM STATUS : 29 JULI 2010
NO
SATKER/PROVINSI
1. DIREKTORAT BINA PROGRAM
JML PAKET BELUM LELANG 2
PAKET KONTRAK/RINCIAN KEGIATAN
1. Paket Persentation Room, 2. Paket LED and Business Plan,
TOTAL
2
PAGU (X Rp.1000)
PERMASALAHAN
350,000 Adanya perubahan layout desain ruangan 350,000 Baru mendapatkan persetujuan KAK dari Worldbank
700,000
TINDAK LANJUT
Saat ini sedang proses akan memasuki pengumuman lelang Sekarang sedang mengajukan draft pengumuman untuk lelang
LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010 DIREKTORAT BINA PROGRAM STATUS : 29 JULI 2010, JAM 08.00 WIB KODE NO SATKER a. 1 2
NAMA SATUAN KERJA
Satker Pusat 466162 Dit Bina Program 505138 Pembinaan Infrastruktur Perdesaan
b. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
PAGU
505730 505749 505755 505761 505097 505786 505100 505770 505792 505821 505840 505837 505843 505868 505101 505106 505993 505107 505874 505880 505899 505900 505104 505940 505931 505102 505105 505103 505108 505110 506022 506038
Satker Propinsi PIP Nanggroe Aceh Darussalam PIP Sumatera Utara PIP Sumatera Barat PIP Riau PIP Kepri PIP Sumatera Selatan PIP Bangka Belitung PIP Jambi PIP Bengkulu PIP Lampung PIP Banten PIP Jawa Barat PIP Jawa Tengah PIP Jawa Timur PIP DI Yogyakarta PIP Bali PIP Nusa Tenggara Timur PIP NTB PIP Kalimantan Barat PIP Kalimantan Tengah PIP Kalimantan Selatan PIP Kalimantan Timur PIP Sulawesi Barat PIP Sulawesi Selatan PIP Sulawesi Tengah PIP Sulawesi Utara PIP Sulawesi Tenggara PIP Gorontalo PIP Maluku PIP Maluku Utara PIP Papua PIP Papua Barat TOTAL
RUPIAH MURNI
PLN
TOTAL
397,375,532 66,532,332 330,843,200
148,471,500 10,000,000 138,471,500
545,847,032 76,532,332 469,314,700
397,857,324 42,289,224 355,568,100
467,500 300,000 167,500
45,484,188 24,043,108 21,441,080
102,038,020 9,900,000 92,138,020
147,522,208 33,943,108 113,579,100
143,567,000 2,916,000 1,910,000 3,649,152 16,343,000 1,036,000 14,612,288 1,213,000 7,263,000 2,917,000 12,503,000 2,442,000 6,823,000 5,941,000 7,545,000 941,000 1,077,000 5,676,000 2,806,000 3,844,000 3,036,424 3,738,136 3,753,000 2,294,000 6,851,000 2,718,000 3,243,000 3,353,000 2,434,000 3,612,000 1,120,000 4,518,000 1,439,000
119,593,282 2,316,000 1,870,000 2,832,912 16,303,000 1,036,000 14,612,288 1,213,000 7,223,000 2,067,000 12,503,000 1,804,000 4,461,350 4,181,000 5,030,000 941,000 1,037,000 4,031,600 2,046,000 2,960,800 2,316,424 2,599,216 2,825,000 1,613,000 4,656,300 1,624,000 2,443,000 2,533,000 1,794,000 2,638,392 1,120,000 3,523,000 1,439,000
591,400
-
40,000 40,000 40,000 40,000 40,000 40,000 40,000 40,000 191,400 40,000 40,000 -
23,382,318 600,000 816,240 810,000 638,000 2,361,650 1,760,000 2,475,000 1,604,400 720,000 883,200 720,000 947,520 928,000 641,000 2,194,700 1,094,000 800,000 820,000 600,000 973,608 995,000 -
-
148,471,500
689,414,032
517,450,606
1,058,900
68,866,506
102,038,020
143,567,000 2,916,000 1,910,000 3,649,152 16,343,000 1,036,000 14,612,288 1,213,000 7,263,000 2,917,000 12,503,000 2,442,000 6,823,000 5,941,000 7,545,000 941,000 1,077,000 5,676,000 2,806,000 3,844,000 3,036,424 3,738,136 3,753,000 2,294,000 6,851,000 2,718,000 3,243,000 3,353,000 2,434,000 3,612,000 1,120,000 4,518,000 1,439,000 540,942,532
-
SWAKELOLA + KONTRAKTUAL AP ≤ 100 JT
PAGU (Rp) KONTRAKTUAL > 100 JT RPM PHLN TOTAL
PAGU TERKONTRAK BLM
TOTAL
RPM
-
545,847,032 76,532,332 469,314,700
40,804,622 19,363,542 21,441,080
23,382,318 600,000 816,240 810,000 638,000 2,361,650 1,760,000 2,475,000 1,604,400 720,000 883,200 720,000 947,520 928,000 641,000 2,194,700 1,094,000 800,000 820,000 600,000 973,608 995,000 -
-
143,567,000 2,916,000 1,910,000 3,649,152 16,343,000 1,036,000 14,612,288 1,213,000 7,263,000 2,917,000 12,503,000 2,442,000 6,823,000 5,941,000 7,545,000 941,000 1,077,000 5,676,000 2,806,000 3,844,000 3,036,424 3,738,136 3,753,000 2,294,000 6,851,000 2,718,000 3,243,000 3,353,000 2,434,000 3,612,000 1,120,000 4,518,000 1,439,000
23,382,318 600,000 816,240 810,000 638,000 2,361,650 1,760,000 2,475,000 1,604,400 720,000 883,200 720,000 947,520 928,000 641,000 2,194,700 1,094,000 800,000 820,000 600,000 973,608 995,000 -
170,904,526
-
689,414,032
64,186,940
PHLN
TOTAL
83,622,963 124,427,585 9,550,000 28,913,542 74,072,963 95,514,043
( x Rp. 1.000 ) SISA PAGU KONTRAK
NILAI KONTRAK RPM
PHLN
TOTAL
83,622,963 119,943,595 9,550,000 26,516,954 74,072,963 93,426,641
816,240 810,000 638,000 2,361,650 1,760,000 2,475,000 1,604,400 720,000 883,200 720,000 947,520 928,000 641,000 2,194,700 1,094,000 800,000 820,000 600,000 973,608 995,000 -
36,320,632 16,966,954 19,353,678 21,345,467 572,950 815,914 769,835 576,605 2,260,315 1,376,628 2,215,994 1,582,845 496,719 769,037 715,864 911,190 887,480 612,500 2,030,386 665,070 766,590 816,750 562,170 959,400 981,225 -
83,622,963 147,809,903
57,666,099
-
23,382,318 600,000
RPM
PHLN
4,483,990 2,396,588 2,087,402
-
21,320,772 572,950 815,914 769,835 576,605 2,260,315 1,351,933 2,215,994 1,582,845 496,719 769,037 715,864 911,190 887,480 612,500 2,030,386 665,070 766,590 816,750 562,170 959,400 981,225 -
2,036,851 27,050 326 40,165 61,395 101,335 383,372 259,006 21,555 223,281 114,163 4,136 36,330 40,520 28,500 164,314 428,930 33,410 3,250 37,830 14,208 13,775 -
83,622,963 141,264,367
6,520,841
-
TOTAL -
4,483,990 2,396,588 2,087,402
-
2,036,851 27,050 326 40,165 61,395 101,335 383,372 259,006 21,555 223,281 114,163 4,136 36,330 40,520 28,500 164,314 428,930 33,410 3,250 37,830 14,208 13,775 -
-
6,520,841
RENCANA PENYERAPAN DAN PROGRES KEUANGAN DIREKTORAT BINA PROGRAM STATUS : 29 JULI 2010, JAM 08.00 WIB ( X Rp. 1000 )
NO
KODE SATKER
RENCANA PENYERAPAN AKHIR BULAN JULI
PAGU NAMA SATUAN KERJA RUPIAH MURNI
1 2
Satker Pusat 466162 Direktorat Bina Program 505138 Pembinaan Pembangunan Infrastruktur Perdesaan
397,375,532 66,532,332 330,843,200
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
505730 505749 505755 505761 505097 505786 505100 505770 505792 505821 505840 505837 505843 505868 505101 505106 505993 505107 505874 505880 505899 505900 505104 505940 505931 505102 505105 505103 505108 505110 506022 506038
Satuan Propinsi Pembangunan IP Nanggroe Aceh Darussalam Pembangunan IP Sumatera Utara Pembangunan IP Sumatera Barat Pembangunan IP Riau Pembangunan IP Kepri Pembangunan IP Sumatera Selatan Pembangunan IP Bangka Belitung Pembangunan IP Jambi Pembangunan IP Bengkulu Pembangunan IP Lampung Pembangunan IP Banten Pembangunan IP Jawa Barat Pembangunan IP Jawa Tengah Pembangunan IP Jawa Timur Pembangunan IP DI Yogyakarta Pembangunan IP Bali Pembangunan IP Nusa Tenggara Timur Pembangunan IP Nusa Tenggara Barat Pembangunan IP Kalimantan Barat Pembangunan IP Kalimantan Tengah Pembangunan IP Kalimantan Selatan Pembangunan IP Kalimantan Timur Pembangunan IP Sulawesi Barat Pembangunan IP Sulawesi Selatan Pembangunan IP Sulawesi Tengah Pembangunan IP Sulawesi Utara Pembangunan IP Sulawesi Tenggara Pembangunan IP Gorontalo Pembangunan IP Maluku Pembangunan IP Maluku Utara Pembangunan IP Papua Pembangunan IP Papua Barat TOTAL
143,567,000 2,916,000 1,910,000 3,649,152 16,343,000 1,036,000 14,612,288 1,213,000 7,263,000 2,917,000 12,503,000 2,442,000 6,823,000 5,941,000 7,545,000 941,000 1,077,000 5,676,000 2,806,000 3,844,000 3,036,424 3,738,136 3,753,000 2,294,000 6,851,000 2,718,000 3,243,000 3,353,000 2,434,000 3,612,000 1,120,000 4,518,000 1,439,000 540,942,532
PLN
TOTAL
148,471,500 10,000,000 138,471,500 148,471,500
KEUANGAN % (RP)
FISIK (%)
REALISASI RUPIAH MURNI
DEVIASI
PHLN
TOTAL
KEU. %
FISIK %
KEUANGAN % (RP)
545,847,032 76,532,332 469,314,700
120,172,897 37,815,529 82,357,368
22.02 49.41 17.55
22.02 49.41 17.55
41,672,177 25,667,984 16,004,193
40,340,008 3,645,758 36,694,250
82,012,185 29,313,742 52,698,443
15.02 38.30 11.23
19.19 38.69 16.01
(38,160,712) (8,501,787) (29,658,925)
(6.99) (11.11) (6.32)
143,567,000 2,916,000 1,910,000 3,649,152 16,343,000 1,036,000 14,612,288 1,213,000 7,263,000 2,917,000 12,503,000 2,442,000 6,823,000 5,941,000 7,545,000 941,000 1,077,000 5,676,000 2,806,000 3,844,000 3,036,424 3,738,136 3,753,000 2,294,000 6,851,000 2,718,000 3,243,000 3,353,000 2,434,000 3,612,000 1,120,000 4,518,000 1,439,000 689,414,032
49,693,237 1,020,600 668,500 1,277,203 5,556,620 362,600 4,968,178 424,550 2,542,050 1,020,950 4,251,020 854,700 2,388,050 2,079,350 2,565,300 329,350 376,950 1,986,600 982,100 1,345,400 1,062,748 1,308,348 1,313,550 802,900 2,397,850 951,300 1,135,050 1,173,550 851,900 1,264,200 392,000 1,536,120 503,650 169,866,134
34.61 35.00 35.00 35.00 34.00 35.00 34.00 35.00 35.00 35.00 34.00 35.00 35.00 35.00 34.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 34.00 35.00 24.64
34.61 35.00 35.00 35.00 34.00 35.00 34.00 35.00 35.00 35.00 34.00 35.00 35.00 35.00 34.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 34.00 35.00 24.64
47,119,794 1,315,230 409,343 1,173,622 3,426,298 495,868 2,692,964 581,624 2,087,309 1,358,453 3,558,084 592,262 3,076,786 2,666,650 2,087,461 440,904 335,652 2,507,776 852,347 1,167,967 1,077,527 1,163,217 908,899 1,052,067 2,573,835 1,197,439 1,620,350 1,346,492 1,097,171 1,622,935 435,548 1,208,386 989,328 88,791,971
40,340,008
47,119,794 1,315,230 409,343 1,173,622 3,426,298 495,868 2,692,964 581,624 2,087,309 1,358,453 3,558,084 592,262 3,076,786 2,666,650 2,087,461 440,904 335,652 2,507,776 852,347 1,167,967 1,077,527 1,163,217 908,899 1,052,067 2,573,835 1,197,439 1,620,350 1,346,492 1,097,171 1,622,935 435,548 1,208,386 989,328 129,131,979
32.82 45.10 21.43 32.16 20.96 47.86 18.43 47.95 28.74 46.57 28.46 24.25 45.09 44.89 27.67 46.85 31.17 44.18 30.38 30.38 35.49 31.12 24.22 45.86 37.57 44.06 49.96 40.16 45.08 44.93 38.89 26.75 68.75 18.73
36.06 45.53 21.43 33.12 20.97 47.87 20.32 47.95 28.94 49.07 28.46 24.88 48.27 52.53 42.19 46.85 43.50 47.37 33.00 45.48 37.91 32.93 23.65 46.44 38.50 52.31 50.48 40.20 45.14 52.92 38.89 43.66 68.75 22.70
(2,573,443) 294,630 (259,157) (103,581) (2,130,322) 133,268 (2,275,214) 157,074 (454,741) 337,503 (692,936) (262,438) 688,736 587,300 (477,839) 111,554 (41,298) 521,176 (129,753) (177,433) 14,779 (145,131) (404,651) 249,167 175,985 246,139 485,300 172,942 245,271 358,735 43,548 (327,734) 485,678 (40,734,155)
(1.79) 10.10 (13.57) (2.84) (13.04) 12.86 (15.57) 12.95 (6.26) 11.57 (5.54) (10.75) 10.09 9.89 (6.33) 11.85 (3.83) 9.18 (4.62) (4.62) 0.49 (3.88) (10.78) 10.86 2.57 9.06 14.96 5.16 10.08 9.93 3.89 (7.25) 33.75 (5.91)
PERMASALAHAN DAN TINDAK LANJUT PROGRES KEGIATAN TA 2010 DI LINGKUNGAN DITJEN CIPTA KARYA STATUS : 29 JULI 2010 BINA PROGRAM NO.
SATKER
PROGRES KEU FISIK % %
ALASAN KETERLAMBATAN
TINDAK LANJUT
1 Pembinaan Pembangunan Infrastruktur Perdesaan
11.23 16.01 Kegiatan penyerapan dana BLM yang dialokasikan pada Mempercepat persetujuan penerbitan SKPA, DIPA Satker PPIP Pusat baru saja selesai pembukan tanda sehingga akan meningkatkan penyerapan (*), dan saat ini masih menunggu proses SKPA yang saat ini masih berada di Ditjen Anggaran sebesar : - PAMSIMAS Rp. 6.308.000.000,- PPIP Rp. 225.000.000.000,mengakibatkan tertundanya pelaksanaan Bantuan Langsung Masyarakat pada desa-desa sasaran
2 Pembangunan IP Sumatera Utara
21.43 21.43 Baru selesai melaksanakan Workshop Perencanaan dan pengendalian
3 Pembangunan IP Riau
20.96 20.97 Fasilitator baru di Kontrak fasilitator awal Mei 2010, dan baru Pertengahan Agustus akan terserap gaji fasilitator dibayarkan gaji 1 bulan. sebesar 1 Milyar.
4 Pembangunan IP Sumatera Selatan
18.43 20.32 Baru direkrut sebanyak 206 org dari total 390 orang Fasilitator Masyarakat (FM). yang terkontrak 1 Juni 2010. sisanya akan terkontrak 1 Agustus 2010
sedang di proses penyerapannya, akan terserap kurang lebih Rp. 200 juta di akhir juli
Akan terserap dari gaji Fasilitator Masyarakat (FM) sebesar Rp 571 Juta pada pertengahan Agustus 2010.
KETERANGAN
RENCANA DAN REALISASI PENYERAPAN DIREKTORAT BINA PROGRAM TAHUN ANGGARAN 2010 800,000 689,414
689,414
700,000
661,096 617,223
DALAM JUTAAN RUPIAH
600,000
487,093
500,000
400,000
PAGU
361,951
RENCANA 300,000 REALISASI 200,000
169,866 123,128 86,865
100,000
-
-
84,263
56,109 2,484
11,702
916 1,850 458 JAN FEB
31,016 15,295 5,171 11,733 2,090 MAR APR
39,17245,114 MEI
99,560
129,132 111,338
61,493
JUN BULAN
JUL
AGT
SEP
OKT
NOP
DES
LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010 SEKRETARIAT JENDERAL CIPTA KARYA PAKET > RP 100 JUTA STATUS : 29 JULI 2010, JAM 08.00 WIB NO
KODE SATKER
1
622213
NAMA SATUAN KERJA SETDITJEN TOTAL
Keterangan : 1 Penyiapan Dokumen Lelang 2 Pengumuman Lelang/Prakualifikasi 3 Penyusunan shortlist 4 Undangan Pelelangan 5 Penjelasan Pekerjaan Aanwyzing 6 Pemasukan Penawaran 7 Usulan Pemenang 8 Penetapan Pemenang 9 Penerbitan Surat Perintah Mulai Kerja 10 Penandatangan Kontrak
PAGU
PAGU (Rp) SWAKELOLA + KONTRAKTUAL AP ≤ 100 JT
PAKET KONTRAK
PLN
TOTAL
114,266,503
1,000,000
115,266,503
78,441,953
490,143
35,334,407
1,000,000
36,334,407
-
115,266,503
6
14
20
114,266,503
1,000,000
115,266,503
78,441,953
490,143
35,334,407
1,000,000
36,334,407
-
115,266,503
6
14
20
KONTRAKTUAL > 100 JT RPM PHLN TOTAL
BLM
TOTAL
NON FISIK
JUMLAH PAKET DALAM PROSES PRA KONTRAK
RUPIAH MURNI
FISIK TOTAL
1
2
3
4
5
6
7
8
4 -
4
9
10
2 -
-
-
-
-
2
-
NILAI KONTRAK (Rp. x 1.000)
14
16,244,090
14
16,244,090
RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010 DI LINGKUNGAN SEKRETARIAT DIREKTORAT JENDERAL CIPTA KARYA STATUS: 29 JULI 2010 NO.
URAIAN PERMASALAHAN
JUMLAH PAKET
1 Persiapan Lelang
-
2 Proses Lelang
6
3 Sanggah Banding
-
4 Tender Ulang
-
5 Review DED
-
6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran a. Loan belum efektif b. Menunggu Penandatanganan Loan Agreement c. Tanggap Darurat d. Revisi Kegiatan e. Belum tersedia dokumen RPIJM f. Menunggu persyaratan pembuktian BMN
-
7 Pemindahan Lokasi
TOTAL
6
TINDAK LANJUT
KETERANGAN
LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010 SEKRETARIAT JENDERAL CIPTA KARYA STATUS : 29 JULI 2010, JAM 08.00 WIB NO
1
KODE SATKER
NAMA SATUAN KERJA
622213 SETDITJEN TOTAL
PAGU SWAKELOLA + KONTRAKTUAL AP ≤ 100 JT
PAGU (Rp) KONTRAKTUAL > 100 JT RPM PHLN TOTAL
RUPIAH MURNI
PLN
TOTAL
114,266,503
1,000,000
115,266,503
78,441,953
490,143
35,334,407 1,000,000
36,334,407
114,266,503
1,000,000
115,266,503
78,441,953
490,143
35,334,407 1,000,000
36,334,407
PAGU TERKONTRAK BLM
TOTAL
RPM
-
115,266,503
-
115,266,503
PHLN
NILAI KONTRAK
TOTAL
RPM
19,352,947
19,352,947
19,352,947
- 19,352,947
PHLN
( x Rp. 1.000 ) SISA PAGU KONTRAK
TOTAL
RPM
PHLN
TOTAL
16,244,090
16,244,090
3,108,857
-
3,108,857
16,244,090
- 16,244,090
3,108,857
-
3,108,857
RENCANA PENYERAPAN DAN PROGRES KEUANGAN SEKRETARIAT JENDERAL CIPTA KARYA STATUS : 29 JULI 2010, JAM 08.00 WIB ( X Rp. 1000 )
NO
KODE SATKER
RENCANA PENYERAPAN AKHIR BULAN JULI
PAGU NAMA SATUAN KERJA RUPIAH MURNI
Satker Pusat 1 622213 Sekretariat Direktorat Jenderal Cipta Karya TOTAL
KEUANGAN
REALISASI
%
45,840,133
39.77
40.87
(16,352,985) (14.19)
-
45,840,133
39.77
40.87
(16,352,985) (14.19)
-
45,840,133
39.77
40.87
(16,352,985) (14.19)
FISIK (%)
115,266,503
62,193,118
53.96
55.96
45,840,133
-
1,000,000
115,266,503
62,193,118
53.96
55.96
45,840,133
1,000,000
115,266,503
62,193,118
53.96
55.96
45,840,133
114,266,503
1,000,000
114,266,503 114,266,503
KEUANGAN
FISIK
%
%
TOTAL
RUPIAH MURNI
KEU.
(RP)
PLN
DEVIASI
PHLN
TOTAL
(RP)
%
RENCANA DAN REALISASI PENYERAPAN SETDITJEN TAHUN ANGGARAN 2010 140,000
115,267
120,000
115,267
110,612 102,659 100,000
DALAM JUTAAN RUPIAH
88,468
76,616
80,000
PAGU
62,193
60,000 RENCANA
47,666 40,000
41,949
33,719
20,000 9,696 4,302
8,3629,518
-
-
2,783
5,566 JAN
REALISASI
39,362 30,326
24,562 16,426
45,840
22,798
24,912
14,494 20,759
14,293
5,566 FEB
MAR
APR
MEI
JUN BULAN
JUL
AGT
SEP
OKT
NOP
DES
RENCANA PENYERAPAN DAN PROGRES KEUANGAN SATKER KABUPATEN/KOTA STATUS : 29 JULI 2010, JAM 08.00 WIB ( X Rp. 1000 ) RENCANA PENYERAPAN AKHIR BULAN JULI
PAGU NO
NAMA SATUAN KERJA RUPIAH MURNI
PLN
TOTAL
1 P2KP
817,891,000
61,800,000
879,691,000
2 PPIP
375,000,000
150,000,000
3 PAMSIMAS
-
4 RISE
TOTAL
KEUANGAN
REALISASI
DEVIASI KEUANGAN
KEU.
FISIK
%
%
15.53
6.10
(147,732,550)
(16.79)
-
-
(147,120,000)
(28.02)
7,390,823
2.90
3.14
(18,096,177)
(7.09)
212,727,036
212,727,036
50.71
50.85
(12,397,964)
(2.96)
234,897,859
356,765,309
17.16
13.22
(325,346,691)
(15.65)
%
FISIK (%)
RUPIAH MURNI
PHLN
TOTAL
284,380,000
32.33
32.33
121,867,450
14,780,000
136,647,450
525,000,000
219,600,000
41.83
36.31
-
-
-
255,100,000
255,100,000
25,487,000
9.99
9.99
-
7,390,823
-
419,500,000
419,500,000
225,125,000
53.67
53.67
-
1,192,891,000
886,400,000
2,079,291,000
754,592,000
36.29
34.90
121,867,450
(RP)
(RP)
%
RENCANA DAN REALISASI PENYERAPAN SATKER KABUPATEN/KOTA TAHUN ANGGARAN 2009 2,500,000
2,079,291
2,079,291
2,000,000
1,901,100
DALAM JUTAAN RUPIAH
1,718,944
1,428,872
1,500,000
PAGU 998,892 1,000,000
RENCANA 754,592 REALISASI 460,042
500,000
185,952 103,717 9,741
1,733
-
-
-
-
JAN
25,487
-
FEB
-
MAR
-
6,182 18,202 APR MEI
356,765 266,850 188,190 106,558
39,576 JUN BULAN
JUL
AGT
SEP
OKT
NOP
DES
RENCANA DAN REALISASI PENYERAPAN PROGRAM PPIP KABUPATEN/KOTA TAHUN ANGGARAN 2010 600,000 525,000
525,000
525,000
525,000
500,000
420,000
DALAM JUTAAN RUPIAH
400,000
282,680
300,000
PAGU
219,600
RENCANA
200,000 REALISASI
147,180
100,000
-
-
-
-
JAN
-
FEB
- 0 -
0MAR
9,600
0 0 APR
0 MEI
0
0 JUN
BULAN
0
0 JUL
AGT
SEP
OKT
NOP
DES
RENCANA DAN REALISASI PENYERAPAN PROGRAM P2KP KABUPATEN/KOTA TAHUN ANGGARAN 2010 1,000,000 879,691
879,691 900,000
838,266 800,000
752,691
DALAM JUTAAN RUPIAH
700,000
658,700
600,000 505,180 500,000
PAGU
400,000
RENCANA
342,940
300,000
REALISASI 219,040
200,000 121,095 70,485
100,000 -
-
-
-
-
JAN
-
FEB
-
26,240 - 0 0 MAR
8,055 100 1,705 MEI APR
136,647
97,180 65,764 37,550 JUN BULAN
JUL
AGT
SEP
OKT
NOP
DES
RENCANA DAN REALISASI PENYERAPAN PROGRAM PAMSIMAS KABUPATEN/KOTA TAHUN ANGGARAN 2010 300,000
255,100 255,100
250,000
207,430
DALAM JUTAAN RUPIAH
200,000
159,759 150,000
PAGU RENCANA 112,832
100,000
REALISASI
65,904 50,000
-
45,696
-
5,737 866 -1,733 JAN FEB
9,741 -
17,614 MAR
25,487 193 APR
25,487
25,487
988 3,545 3,822 4,872 193 MEI JUN JUL BULAN
25,487
25,487 25,487
7,391 AGT
SEP
OKT
NOP
DES
RENCANA DAN REALISASI PENYERAPAN PROGRAM RISE KABUPATEN/KOTA TAHUN ANGGARAN 2010 450,000
419,500
419,500 397,013
400,000
374,525
350,000
331,875
289,225
300,000 DALAM JUTAAN RUPIAH
419,500419,500
257,175 250,000
225,125 PAGU
212,727
200,000
179,400
RENCANA
164,798 150,000
REALISASI
133,675 118,604
98,025 100,000 62,375
65,463
44,063
50,000
25,750 -
-
-
-
-
JAN
-
FEB
-
MAR
12,875 -
30,532 16,305
5,889 APR
MEI
JUN BULAN
JUL
AGT
SEP
OKT
NOP
DES
Pelaksanaan Kegiatan Inpres No. 1 Tahun 2010 PROGRAM PRIORITAS DITJEN CIPTA KARYA (4 Program Prioritas, 5 Rencana Aksi, dan 10 Sub Rencana Aksi) RENCANA AKSI Program Prioritas 3 (N3): Bidang Kesehatan • (N3P12A5) Peningkatan Pelayanan Air Minum dan Sanitasi a. 314 Lokasi SPAM Perdesaan b. 9 Kab/Kota Pemb. Sanitasi dan 10 Kab/Kota Pemb. Drainase Program Prioritas 4 (N4): Bidang Penanggulangan Kemiskinan • (N4P19A2) Pemantapan pelaksanaan PNPM Inti a. 8,230 Kelurahan P2KP b. 237 Kecamatan PISEW • (N4P19A3) Peningkatan integrasi PNPM Penguatan a. 23 Kawasan Sanimas b. 1,320 Desa Pamsimas Program Prioritas 6 (N6): Bidang Infrastruktur • (N6P30A1) Pembangunan rumah susun sederhana sewa a. Rusunawa 37 TB selesai 40% Program Prioritas 9 (N9): Bidang Lingkungan Hidup dan Pengelolaan Bencana • (N9P49A1) Peningkatan pembangunan Tempat Pembuangan Akhir (TPA) dengan menerapkan sanitary land fill dan mengoptimalkan program 3R (reduce, reuse, recycle) a. 6 TPA Regional di 17 Kabupaten b. 49 Kabupaten Sanitary Landfill c. 50 Lokasi 3R
PENANGGUNG JAWAB
INSTANSI TERKAIT
Kementerian Pekerjaan Umum
Kab/Kota Terkait
Kementerian Pekerjaan Umum
Daerah terkait
Kementerian Pekerjaan Umum
Daerah terkait
Kementerian Pekerjaan Umum
Kementerian Perumahan
Kementerian Pekerjaan Umum
Kab/Kota Terkait, Daerah terkait
(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)
(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)
(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)
(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)
(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)
(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)
(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)
(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)
Pelaksanaan Kegiatan Inpres No.3 Tahun 2010 Program Pembangunan yang Berkeadilan Direktorat Jenderal Cipta Karya RENCANA AKSI D3P39 : Program Pembinaan dan Pengembangan Infrastruktur Permukiman • D3P39A95: Pengaturan, pembinaan, pengawasan, pengembangan sumber pembiayaan dan pola investasi, serta pengembangan sistem penyediaan air minum a. 314 Lokasi SPAM Perkotaan dan Perdesaan b. 1320 desa PAMSIMAS
PENANGGUNG JAWAB
INSTANSI TERKAIT
Kementerian Pekerjaan Umum
Pemda Terkait
• D3P39A96: Pengaturan, pembinaan, pengawasan, pengembangan sumber Kementerian Pekerjaan pembiayaan dan pola investasi, serta pengelolaan pengembangan infrastruktur Umum sanitasi dan persampahan a. 9 Kab/Kota infrastruktur air limbah off-site b. 23 Kab/Kota infratstruktur air limbah on-site
Pemda Terkait
(Status 22 Juli 2010
D3 - PENCAPAIAN MILLENIUM DEVELOPMENT GOALS RENCANA AKSI
PENANGGUNG JAWAB
INSTANSI TERKAIT
1
2
3
KRITERIA KEBERHASILAN 4
UKURAN KEBERHASILAN 5
UKURAN KEBERHASILAN B07, B08, B10, B12
% CAPAIAN
KETERANGAN
6
7
8
D3P39 : Program Pembinaan dan Pengembangan Infrastruktur Permukiman D3P39A95: Pengaturan, pembinaan, pengawasan, pengembangan sumber pembiayaan dan pola investasi, serta pengembangan sistem penyediaan air minum
Kementerian Pekerjaan Umum
Pemerintah Daerah Provinsi Terkait
Terfasilitasinya kawasan perkotaan dan perdesaan yang terlayani air minum
TARGET: Terfasilitasinya 314 kawasan perkotaan dan perdesaan yang terlayani air minum
B07: > 100% TARGET B07: Penandatanganan kontrak 306 lokasi dan pembangunan fisik telah mencapai 5% pada 94 lokasi
Penandatanganan kontrak telah seselasi untuk 306 lokasi dan pembangunan fisik telah mencapai ratarata 62,48% pada 232 lokasi
B08: XX% TARGET B08: Penandatanganan kontrak 314 lokasi dan pembangunan fisik telah mencapai 20% pada 300 lokasi
TARGET: Terfasilitasinya 1.320 desa yang terlayani air minum berbasis masyarakat
TARGET B10: Pembangunan fisik telah mencapai 60% pada 314 lokasi
B10: XX%
TARGET B12: Pembangunan fisik telah mencapai 100% pada 314 lokasi
B12: XX%
TARGET B07: Penyusunan Rencana Kerja Masyarakat (RKM) pada 654 desa
B07: > 100%
B08: XX% TARGET B08: Pembayaran Tahap I pada 654 desa
TARGET B10: Pembayaran Tahap II pada 1.220 desa
B10: XX%
TARGET B12: Pembayaran Tahap III pada 1.320 desa
B12: XX%
RKM telah tersusun untuk 658 desa
D3 - PENCAPAIAN MILLENIUM DEVELOPMENT GOALS RENCANA AKSI
PENANGGUNG JAWAB
INSTANSI TERKAIT
1
2
3
(Status 22 Juli 2010
KRITERIA KEBERHASILAN 4
UKURAN KEBERHASILAN 5
UKURAN KEBERHASILAN B07, B08, B10, B12
% CAPAIAN
KETERANGAN
6
7
8
D3P39 : Program Pembinaan dan Pengembangan Infrastruktur Permukiman D3P39A96: Pengaturan, pembinaan, pengawasan, pengembangan sumber pembiayaan dan pola investasi, serta pengelolaan pengembangan infrastruktur sanitasi dan persampahan
Kementerian Pekerjaan Umum
Pemerintah Daerah Provinsi: Sumbar, Riau, Kepri, Bengkulu, Sumsel, Babel, Banten, Jabar, Jateng, Jatim, Kalteng, Sulsel, Sultra, Maluku, Papua Barat, Sumut, Yogyakarta, Kalsel, Kaltim, Sulteng, Bali
Terlayaninya kawasan dengan infrastruktur air limbah melalui sistem off-site
Terlayaninya kawasan dengan infrastruktur air limbah melalui sistem on-site
TARGET: 9 kabupaten/kota
TARGET: 23 kabupaten/kota
TARGET B07: Penandatanganan kontrak pada 5 lokasi/ kawasan dan penyiapan dokumen lelang pada 4 lokasi/kawasan yang dibiayai Pinjaman Luar Negeri
B07: 100%
TARGET B08: Pembangunan fisik telah mencapai 10% pada 5 lokasi/kawasan dan proses pelelangan pada 4 lokasi/kawasan yang dibiayai Pinjaman Luar Negeri
B08: XX%
TARGET B10: Pembangunan fisik telah mencapai 50% pada 5 lokasi/kawasan, dan proses pelelangan pada 4 lokasi/kawasan yang dibiayai Pinjaman Luar Negeri
B10: XX%
TARGET B12: Pembangunan fisik telah mencapai 100% sesuai target 2010 pada 5 lokasi/kawasan dan penandatanganan kontrak pada 4 lokasi/kawasan yang dibiayai Pinjaman Luar Negeri
B12: XX% Penandatanganan kontrak selesai apabila persetujuan donor sesuai dengan jadwal
B07: 100% TARGET B07: Proses pemberdayaan selesai 100% pada 22 lokasi/kawasan TARGET B08: Penandatanganan kontrak 100% pada 23 lokasi/kawasan
B08: XX%
TARGET B10: Pembangunan fisik mencapai 50% pada 23 lokasi/kawasan
B10: XX%
TARGET B12: Pembangunan fisik mencapai 100% pada 23 lokasi/kawasan
B12: XX%