KEMAJUAN PELAKSANAAN KEGIATAN PEMBANGUNAN DI LINGKUNGAN DITJEN CIPTA KARYA
STATUS : 18 AGUSTUS 2009
DEPARTEMEN PEKERJAAN UMUM DIREKTORAT JENDERAL CIPTA KARYA
1
PELAKSANAAN KEGIATAN DITJEN CIPTA KARYA TAHUN ANGGARAN 2009 STATUS : 18 AGUSTUS 2009 TOTAL PAGU DITJEN CIPTA KARYA TAHUN ANGGARAN 2009 SEBESAR Rp. 8,834 TRILIUN (RUPIAH MURNI Rp. 5,328 TRILIUN DAN PLN Rp. 3,506 TRILIUN) YANG TERDIRI DARI : x Rp. 1.000 PAGU NO
SUMBER DANA
RUPIAH MURNI
1
REGULER (MA 33)
2
STIMULUS FISKAL Direktorat Air Minum - Pusat - Propinsi - Kabupaten
692,970,000 449,970,000 225,000,000 25,000,000 199,970,000
Direktorat Pengembangan Permukiman - Pusat - Propinsi - Kabupaten
243,000,000 65,000,000 25,000,000 153,000,000
MATA ANGGARAN 999 Direktorat Air Minum (Insentif) Direktorat Air Minum (On-Top) Direktorat Penyehatan Lingkungan Permukiman Direktorat Pengembangan Permukiman - Pusat (On-Top) - Kabupaten/Kota (NUSSP) Direktorat Bina Program (Pembinaan)
350,296,114 202,750,000 12,500,000 107,639,760 13,461,476 13,461,476 13,944,878 5,329,396,360
3
4,286,130,246
TOTAL
PELAKSANAAN LELANG
PLN
TOTAL
3,472,450,000
JUMLAH PAKET
NILAI PAGU PAKET
PROSES LELANG
PERSIAPAN
TERKONTRAK
NILAI TERKONTRAK
7,758,580,246
4,066
3,873,024,532
138
194
3,734
3,188,500,521
-
692,970,000 449,970,000 225,000,000 25,000,000 199,970,000
691 287 146 14 127
659,317,207 419,545,369 221,076,469 198,468,900
20 15
376 145 19 14 112
295 127 127 -
304,111,426 174,439,470 174,439,470 -
-
243,000,000 65,000,000 25,000,000 153,000,000
404 106 16 282
239,771,838 64,178,790 24,632,083 150,960,965
231 231
168 106 16 46
129,671,956 56,974,712 24,164,259 48,532,985
107,261,269 107,261,269 74,000,000 33,261,269 -
457,557,383 202,750,000 12,500,000 107,639,760 120,722,745 87,461,476 33,261,269 13,944,878
226 140
-
142 85 17 40 40 -
58 46
17 65 65 4
109,806,141 20,590,139 86,396,002 86,396,002 2,820,000
4
79,860,298 76,774,936 439,300 439,300 2,646,062
3,579,711,269
8,909,107,629
4,983
4,642,147,880
175
712
4,087
3,572,472,246
15 5 5 17 17 17
8 8 -
PROGRES PELAKSANAAN KEGIATAN DITJEN CIPTA KARYA REKAPITULASI NASIONAL A.
Progres Fisik dan Keuangan pelaksanaan kegiatan dengan status 18 Agustus 2009 dari total Pagu sebesar Rp. 7,75 Trilyun (Rupiah Murni Rp. 4,28 Trilyun dan PLN Rp. 3,47 Trilyun) telah dicapai : Direktorat Jenderal Cipta Karya (x 1.000)
Progres Fisik (%) Keuangan (Rp) Keuangan (%)
Rencana penyerapan Minggu Target Penyerapan Minggu Ke-2 Bulan Agustus Ke-2 Bulan Agustus 68.68 4,694,890,166 60.51
55.40 3,670,535,416 47.31
Realisasi 40.40 2,588,576,791 33.36
Deviasi -15.00 (1,081,958,625) -13.95
REKAPITULASI LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2009 DIREKTORAT JENDERAL CIPTA KARYA STATUS: 18 AGUSTUS 2009 PAGU NO
1 2 3 4 5 6 7
NAMA SATUAN KERJA
Direktorat Pengembangan Air Minum Direktorat Pengembangan PLP Direktorat Pengembangan Permukiman Direktorat Penataan Bangunan dan Lingkungan Direktorat Bina Program Sekretariat Jenderal Cipta Karya Program Pemberdayaan Masyarakat -P2KP -PPIP -PAMSIMAS -RISE TOTAL
Keterangan : 1 Penyiapan Dokumen Lelang 2 Pengumuman Lelang/Prakualifikasi 3 Penyusunan shortlist 4 Undangan Pelelangan 5 Penjelasan Pekerjaan Aanwyzing 6 Pemasukan Penawaran 7 Usulan Pemenang 8 Penetapan Pemenang 9 Penerbitan Surat Perintah Mulai Kerja 10 Penandatangan Kontrak
RUPIAH MURNI
PLN
TOTAL
PAGU (Rp) SWAKELOLA + KONTRAKTUAL AP
PAKET KONTRAK NON FISIK TOTAL FISIK
BLM -
211 372 512 674 101 5 -
JUMLAH PAKET DALAM PROSES PRA KONTRAK 1
2
1,387,751,376 639,627,996 928,033,940 640,429,953 242,504,499 97,782,482 350,000,000 350,000,000 -
62,230,000 226,500,000 77,800,000 808,424,635 89,354,380 2,208,140,985 1,040,015,985 431,000,000 317,625,000 419,500,000
1,449,981,376 866,127,996 1,005,833,940 1,448,854,588 331,858,879 97,782,482 2,558,140,985 1,040,015,985 781,000,000 317,625,000 419,500,000
193,219,490 68,468,827 73,231,913 117,375,409 108,592,368 61,117,687 -
1,256,761,886 797,659,169 922,602,027 712,072,544 147,264,111 36,664,795 -
10,000,000 619,406,635 76,002,400 2,558,140,985 1,040,015,985 781,000,000 317,625,000 419,500,000
744 955 354 726 490 1,002 552 1,226 9 110 42 47 -
1 136 1 -
47 2 3 -
4,286,130,246
3,472,450,000
7,758,580,246
622,005,694
3,873,024,532
3,263,550,020 1,875 2,191 4,066
138
52
3
4 1 5 -
2 8
5
-
6
-
2 -
6
2
7
8
9
-
10 3 9
31 12 3 -
-
912 522 4 998 26 1,163 110 2 29 -
1,048,569,399 510,430,140 837,168,414 630,266,807 138,439,948 23,625,813 -
22
46
32 3,734
3,188,500,521
1 16 9 26
-
10
NILAI KONTRAK (Rp. x 1.000)
6
REKAPITULASI LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2009 DIREKTORAT JENDERAL CIPTA KARYA STATUS: 18 AGUSTUS 2009 ( x Rp. 1.000 ) PAGU NO
1 2 3 4 5 6 7
NAMA SATUAN KERJA
Direktorat Pengembangan Air Minum Direktorat Pengembangan PLP Direktorat Pengembangan Permukiman Direktorat Penataan Bangunan dan Lingkungan Direktorat Bina Program Sekretariat Jenderal Cipta Karya Program Pemberdayaan Masyarakat -P2KP -PPIP -PAMSIMAS -RISE TOTAL
RUPIAH MURNI
PLN
TOTAL
SWAKELOLA + AP
RPM
PAGU (Rp) KONTRAKTUAL PHLN
PAGU TERKONTRAK TOTAL
BLM
RPM
PHLN
SISA PAGU KONTRAK
NILAI KONTRAK TOTAL
RPM
PHLN
TOTAL
RPM
TOTAL
PHLN
1,387,751,376 639,627,996 928,033,940 640,429,953 242,504,499 97,782,482 350,000,000 350,000,000 -
62,230,000 226,500,000 77,800,000 808,424,635 89,354,380 2,208,140,985 1,040,015,985 431,000,000 317,625,000 419,500,000
1,449,981,376 866,127,996 1,005,833,940 1,448,854,588 331,858,879 97,782,482 2,558,140,985 1,040,015,985 781,000,000 317,625,000 419,500,000
193,219,490 68,468,827 73,231,913 117,375,409 108,592,368 61,117,687 -
1,211,579,886 571,159,169 854,802,027 523,054,544 57,909,731 36,664,795 -
45,182,000 226,500,000 67,800,000 189,018,000 89,354,380 -
1,256,761,886 797,659,169 922,602,027 712,072,544 147,264,111 36,664,795 -
10,000,000 619,406,635 76,002,400 2,558,140,985 1,040,015,985 781,000,000 317,625,000 419,500,000
1,145,896,000 490,781,184 842,348,157 493,450,459 56,801,758 27,140,037 -
9,808,000 71,353,101 67,800,000 174,543,455 89,354,380 -
1,155,704,000 562,134,285 910,148,157 667,993,914 146,156,138 27,140,037 -
1,038,761,399 439,077,039 769,368,414 455,829,281 49,832,116 23,625,813 -
9,808,000 71,353,101 67,800,000 174,437,526 88,607,832 -
1,048,569,399 510,430,140 837,168,414 630,266,807 138,439,948 23,625,813 -
107,134,601 51,704,145 72,979,743 37,621,178 6,969,642 3,514,224 -
105,929 746,548 -
107,134,601 51,704,145 72,979,743 37,727,107 7,716,190 3,514,224 -
4,286,130,246
3,472,450,000
7,758,580,246
622,005,694
3,255,170,152
617,854,380
3,873,024,532
3,263,550,020
3,056,417,595
412,858,936
3,469,276,531
2,776,494,062
412,006,459
3,188,500,521
279,923,533
852,477
280,776,010
REKAPITULASI LAPORAN PELAKSANAAN BULANAN TA 2009 DIREKTORAT JENDERAL CIPTA KARYA STATUS: 18 AGUSTUS 2009 10:43:04 PAGU NO
NAMA SATUAN KERJA RUPIAH MURNI
1 2 3 4 5 6 7
PLN
TOTAL
RENCANA PENYERAPAN TARGET PENYERAPAN MINGGU KE-2 BULAN MINGGU KE-2 BULAN AGUSTUS AGUSTUS FISIK FISIK KEUANGAN (RP) KEUANGAN (RP) (%) (%)
REALISASI RUPIAH MURNI
PHLN
( x Rp. 1.000 ) DEVIASI
TOTAL
KEU. %
FISIK %
KEUANGAN (RP) %
Direktorat Pengembangan Air Minum Direktorat Pengembangan PLP Direktorat Pengembangan Permukiman Direktorat Penataan Bangunan dan Lingkungan Direktorat Bina Program Sekretariat Jenderal Cipta Karya Program Pemberdayaan Masyarakat -P2KP -PPIP -PAMSIMAS -RISE
1,387,751,376 639,627,996 928,033,940 640,429,953 242,504,499 97,782,482 350,000,000 350,000,000 -
62,230,000 226,500,000 77,800,000 808,424,635 89,354,380 2,208,140,985 1,040,015,985 431,000,000 317,625,000 419,500,000
1,449,981,376 866,127,996 1,005,833,940 1,448,854,588 331,858,879 97,782,482 2,558,140,985 1,040,015,985 781,000,000 317,625,000 419,500,000
1,045,559,387 436,314,990 770,966,835 824,714,485 215,018,825 71,862,336 1,330,453,307 486,647,842 295,656,250 194,199,215 353,950,000
83.34 61.07 84.33 72.67 69.63 77.73 54.07 60.00 46.48 2.10 92.86
714,713,143 389,091,266 689,031,951 668,452,093 136,109,786 57,349,426 1,015,787,750 276,256,750 303,975,000 81,606,000 353,950,000
72.44 61.07 76.83 58.44 48.79 65.61 34.14 27.93 23.91 2.05 92.86
537,373,337 219,027,360 512,093,252 251,976,544 83,202,122 56,582,350 43,400,000 43,400,000 -
5,835,547 57,604,567 34,432,871 247,534,412 41,580,127 497,934,301 184,333,590 7,200,000 57,252,681 249,148,030
543,208,884 276,631,928 546,526,123 499,510,956 124,782,249 56,582,350 541,334,301 184,333,590 50,600,000 57,252,681 249,148,030
37.46 31.94 54.34 34.48 37.60 57.87 21.16 17.72 6.48 18.03 59.39
47.21 38.01 66.34 41.75 43.81 59.89 25.19 17.72 6.43 36.67 69.96
-171,504,259 -112,459,338 -142,505,829 -168,941,137 -11,327,537 -767,076 -474,453,449 -91,923,160 -253,375,000 -24,353,319 -104,801,970
(11.83) (12.98) (14.17) (11.66) (3.41) (0.78) (18.55) (8.84) (32.44) (7.67) (24.98)
Total
4,286,130,246
3,472,450,000
7,758,580,246
4,694,890,166
68.68
3,670,535,416
55.40
1,703,654,965
884,921,825
2,588,576,791
33.36
40.40
-1,081,958,625
-13.95
RENCANA DAN REALISASI PENYERAPAN DITJEN CIPTA KARYA TAHUN ANGGARAN 2009 9,000,000 8,000,000 7,758,580
7,397,430
7,758,580 7,758,580
6,797,382
7,000,000 DALAM JUTAAN RUPIAH
6,108,090 6,000,000
5,198,607
5,000,000
PAGU RENCANA
4,191,174
4,000,000
REALISASI
3,173,894
3,000,000
TARGET
2,198,838
2,000,000
1,438,446 804,713
1,000,000 98,248
-
0
JAN
385,105
2,588,577 2,218,088 1,846,830 1,631,640 1,301,681 971,582 721,346
277,498 540,736 - 58,991134,247 196,017 FEB MAR APR MEI
JUN
JUL
AGT
SEP
OKT
NOP
DES
BULAN
TARGET PENYERAPAN 6 BULAN KEDEPAN KEGIATAN PELAKSANAAN DITJEN CIPTA KARYA TA 2009 DIREKTORAT JENDERAL CIPTA KARYA
PELAKSANAAN
TOTAL PAGU
(x Rp. 1000)
JUNI
JULI
AGUSTUS
BULAN SEPTEMBER
OKTOBER
NOPEMBER
DESEMBER
85.71 6,557,634,722 1,069,012,182
95.77 7,290,304,921 732,670,200
100.00 7,692,650,147 402,345,226
7,758,580,246 FISIK % KEUANGAN (KOMULATIF) KEUANGAN (ABSOLUTE)
27.75 1,832,262,923 1,832,262,923
42.26 3,114,784,560 1,282,521,637
55.40 4,226,286,271 1,111,501,711
71.46 5,488,622,540 1,262,336,268
PROGRES PELAKSANAAN KEGIATAN DITJEN CIPTA KARYA Direktorat Pengembangan Air Minum A.
Saat ini progres pelaksanaan kegiatan yang telah dicapai yakni :
Direktorat Pengembangan Air Minum (x 1.000)
Progres Fisik (%) Keuangan (Rp) Keuangan (%)
Rencana penyerapan Minggu Target Penyerapan Minggu Ke-2 Bulan Agustus Ke-2 Bulan Agustus 83.34 1,045,559,387 72.11
72.44 714,713,143 49.29
Realisasi 47.21 543,208,884 37.46
Deviasi -25.23 (171,504,259) -11.83
LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2009 DIREKTORAT PENGEMBANGAN AIR MINUM STATUS: 18 AGUSTUS 2009 NO
1 2
KODE SATKER
PAGU (Rp)
PAGU NAMA SATUAN KERJA
Satker Pusat 466178 Direktorat Pengembangan Air Minum 448311 Pengembangan Sistem Penyediaan AM IKK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
501380 494931 494993 495044 495364 495081 495260 495163 495302 495220 496055 495596 495684 495741 495817
Satker Propinsi Wilayah 1 Pengembangan Kinerja Pengelolaan AM NAD Pengembangan Kinerja Pengelolaan AM Sumut Pengembangan Kinerja Pengelolaan AM Sumbar Pengembangan Kinerja Pengelolaan AM Riau Pengembangan Kinerja Pengelolaan AM Kepri Pengembangan Kinerja Pengelolaan AM Jambi Pengembangan Kinerja Pengelolaan AM Bengkulu Pengembangan Kinerja Pengelolaan AM Sumsel Pengembangan Kinerja Pengelolaan AM Babel Pengembangan Kinerja Pengelolaan AM Lampung Pengembangan Kinerja Pengelolaan AM Banten Pengembangan Kinerja Pengelolaan AM Jawa Barat Pengembangan Kinerja Pengelolaan AM Jawa Tengah Pengembangan Kinerja Pengelolaan AM D.I.Y Pengembangan Kinerja Pengelolaan AM Jawa Timur
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
495879 495920 495967 496002 496112 496752 496174 496240 466235 496313 496441 496539 496582 496369 496709 496642 496828
Wilayah 2 Pengembangan Kinerja Pengelolaan AM Kalbar Pengembangan Kinerja Pengelolaan AM Kalteng Pengembangan Kinerja Pengelolaan AM Kalsel Pengembangan Kinerja Pengelolaan AM Kaltim Pengembangan Kinerja Pengelolaan AM Sulut Pengembangan Kinerja Pengelolaan AM Gorontalo Pengembangan Kinerja Pengelolaan AM Sulteng Pengembangan Kinerja Pengelolaan AM Sulsel Pengembangan Kinerja Pengelolaan AM Sulbar Pengembangan Kinerja Pengelolaan AM Sultra Pengembangan Kinerja Pengelolaan AM Bali Pengembangan Kinerja Pengelolaan AM NTB Pengembangan Kinerja Pengelolaan AM NTT Pengembangan Kinerja Pengelolaan AM Maluku Pengembangan Kinerja Pengelolaan AM Maluku Utara Pengembangan Kinerja Pengelolaan AM Papua Pengembangan Kinerja Pengelolaan AM Papua Barat TOTAL
Keterangan : 1 Penyiapan Dokumen Lelang 2 Pengumuman Lelang/Prakualifikasi 3 Penyusunan shortlist 4 Undangan Pelelangan 5 Penjelasan Pekerjaan Aanwyzing 6 Pemasukan Penawaran
PAKET KONTRAK NON FISIK TOTAL FISIK
SWAKELOLA + AP
KONTRAKTUAL
223,714,376 51,864,376 171,850,000
30,640,295 23,725,201 6,915,094
193,074,081 28,139,175 164,934,906
-
61,230,000 36,746,000 7,950,000 3,308,000 4,166,000 1,251,000 2,861,000 15,210,000 2,000,000
1,226,267,000 640,875,000 32,563,000 53,036,000 55,602,000 34,945,000 25,395,000 28,158,000 27,145,000 57,106,000 24,478,000 24,891,000 18,757,000 59,426,000 102,256,000 31,023,000 66,094,000
162,579,195 76,183,848 1,689,625 2,525,875 14,127,300 6,923,060 1,195,000 1,556,659 1,101,535 8,515,543 1,377,355 1,217,331 4,628,057 9,750,345 17,127,173 2,036,890 2,412,100
1,063,687,805 564,691,152 30,873,375 50,510,125 41,474,700 28,021,940 24,200,000 26,601,341 26,043,465 48,590,457 23,100,645 23,673,669 14,128,943 49,675,655 85,128,827 28,986,110 63,681,900
-
560,908,000 48,362,000 25,332,000 37,761,000 31,095,000 27,791,000 22,016,000 26,154,000 53,610,000 18,625,000 26,099,000 25,299,000 37,409,000 44,333,000 31,866,000 45,633,000 32,532,000 26,991,000
24,484,000 4,183,000 4,968,000 3,785,000 5,906,000 5,642,000 -
585,392,000 48,362,000 25,332,000 41,944,000 31,095,000 27,791,000 26,984,000 29,939,000 59,516,000 18,625,000 26,099,000 25,299,000 37,409,000 49,975,000 31,866,000 45,633,000 32,532,000 26,991,000
86,395,347 1,704,960 1,214,780 12,544,000 1,643,000 1,041,000 9,996,271 19,447,191 10,418,280 3,390,943 1,513,692 1,300,275 609,000 13,145,004 2,931,134 3,727,161 1,537,500 231,156
498,996,653 46,657,040 24,117,220 29,400,000 29,452,000 26,750,000 16,987,729 10,491,809 49,097,720 15,234,057 24,585,308 23,998,725 36,800,000 36,829,996 28,934,866 41,905,839 30,994,500 26,759,844
-
1,387,751,376
62,230,000
1,449,981,376
193,219,490
1,256,761,886
RUPIAH MURNI
PLN
TOTAL
222,714,376 50,864,376 171,850,000
1,000,000 1,000,000 -
1,165,037,000 604,129,000 32,563,000 53,036,000 47,652,000 31,637,000 25,395,000 28,158,000 27,145,000 52,940,000 24,478,000 24,891,000 17,506,000 56,565,000 87,046,000 31,023,000 64,094,000
7. Usulan Pemenang 8. Penetapan Pemenang 9. Penerbitan Surat Perintah Mulai Kerja 10. Penandatangan Kontrak
BLM
3
1 1 -
-
-
6
7
8
9
-
-
-
-
-
-
48 23 25
158,534,969 25,068,725 133,466,244
-
10 3 1 1 1 -
31 23 2 1 20 -
-
864 530 17 28 21 22 27 33 19 11 32 24 35 26 131 44 60
890,034,430 465,455,884 28,460,149 44,524,998 29,489,967 18,477,654 21,155,496 21,478,227 24,404,896 46,548,882 21,567,256 23,633,086 13,287,782 45,357,359 43,538,143 23,234,389 60,297,600
8 3
-
-
-
334 32 17 14 15 16 11 13 73 14 16 13 18 23 22 14 11 12
424,578,546 31,255,215 23,449,879 23,388,051 27,288,515 22,746,416 16,291,830 17,032,747 36,573,290 14,463,563 18,311,513 22,415,492 25,265,069 33,630,443 27,214,859 31,438,989 29,798,991 24,013,684
31
-
912
1,048,569,399
-
183 102 4 3 6 11 14 9 4 2 10 8 3 2 20 4 2
722 454 13 25 17 12 14 25 16 9 22 16 32 24 131 40 58
905 556 17 28 23 23 28 34 20 11 32 24 35 26 151 44 60 -
-
-
-
-
81 5 2 2 6 3 2 4 26 6 3 3 2 12 1 1 1 2
268 30 15 12 9 13 9 10 48 8 15 10 16 12 21 20 10 10
349 35 17 14 15 16 11 14 74 14 18 13 18 24 22 21 11 12 -
-
-
-
-
211
744
955
-
1
-
1
5
22 5 17
1
-
1
-
-
-
-
-
-
-
7 -
1 1 2 -
1
7 10
10
NILAI KONTRAK (Rp. x 1.000)
4
28 19 9
-
50 24 26
2
-
-
-
JUMLAH PAKET DALAM PROSES PRA KONTRAK 1
LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2009 DIREKTORAT PENGEMBANGAN AIR MINUM STATUS: 18 AGUSTUS 2009 ( x Rp. 1.000 ) KODE SATKER
PAGU NAMA SATUAN KERJA
PAGU (Rp) KONTRAKTUAL PHLN
PAGU TERKONTRAK
PLN
TOTAL
222,714,376 50,864,376 171,850,000
1,000,000 1,000,000 -
223,714,376 51,864,376 171,850,000
30,640,295 23,725,201 6,915,094
192,074,081 27,139,175 164,934,906
1,000,000 1,000,000
193,074,081 28,139,175 164,934,906
-
Satker Propinsi Wilayah 1 501380 Pengembangan Kinerja Pengelolaan AM NAD 494931 Pengembangan Kinerja Pengelolaan AM Sumut 494993 Pengembangan Kinerja Pengelolaan AM Sumbar 495044 Pengembangan Kinerja Pengelolaan AM Riau 495364 Pengembangan Kinerja Pengelolaan AM Kepri 495081 Pengembangan Kinerja Pengelolaan AM Jambi 495260 Pengembangan Kinerja Pengelolaan AM Bengkulu 495163 Pengembangan Kinerja Pengelolaan AM Sumsel 495302 Pengembangan Kinerja Pengelolaan AM Babel 495220 Pengembangan Kinerja Pengelolaan AM Lampung 496055 Pengembangan Kinerja Pengelolaan AM Banten 495596 Pengembangan Kinerja Pengelolaan AM Jawa Barat 495684 Pengembangan Kinerja Pengelolaan AM Jawa Tengah 495741 Pengembangan Kinerja Pengelolaan AM D.I.Y 495817 Pengembangan Kinerja Pengelolaan AM Jawa Timur
1,165,037,000 604,129,000 32,563,000 53,036,000 47,652,000 31,637,000 25,395,000 28,158,000 27,145,000 52,940,000 24,478,000 24,891,000 17,506,000 56,565,000 87,046,000 31,023,000 64,094,000
61,230,000 36,746,000 7,950,000 3,308,000 4,166,000 1,251,000 2,861,000 15,210,000 2,000,000
1,226,267,000 640,875,000 32,563,000 53,036,000 55,602,000 34,945,000 25,395,000 28,158,000 27,145,000 57,106,000 24,478,000 24,891,000 18,757,000 59,426,000 102,256,000 31,023,000 66,094,000
162,579,195 76,183,848 1,689,625 2,525,875 14,127,300 6,923,060 1,195,000 1,556,659 1,101,535 8,515,543 1,377,355 1,217,331 4,628,057 9,750,345 17,127,173 2,036,890 2,412,100
1,019,505,805 532,057,152 30,873,375 50,510,125 33,524,700 24,713,940 24,200,000 26,601,341 26,043,465 44,424,457 23,100,645 23,673,669 14,128,943 49,675,655 69,918,827 28,986,110 61,681,900
44,182,000 32,634,000
1,063,687,805 564,691,152 30,873,375 50,510,125 41,474,700 28,021,940 24,200,000 26,601,341 26,043,465 48,590,457 23,100,645 23,673,669 14,128,943 49,675,655 85,128,827 28,986,110 63,681,900
-
Wilayah 2 495879 Pengembangan Kinerja Pengelolaan AM Kalbar 495920 Pengembangan Kinerja Pengelolaan AM Kalteng 495967 Pengembangan Kinerja Pengelolaan AM Kalsel 496002 Pengembangan Kinerja Pengelolaan AM Kaltim 496112 Pengembangan Kinerja Pengelolaan AM Sulut 496752 Pengembangan Kinerja Pengelolaan AM Gorontalo 496174 Pengembangan Kinerja Pengelolaan AM Sulteng 496240 Pengembangan Kinerja Pengelolaan AM Sulsel 466235 Pengembangan Kinerja Pengelolaan AM Sulbar 496313 Pengembangan Kinerja Pengelolaan AM Sultra 496441 Pengembangan Kinerja Pengelolaan AM Bali 496539 Pengembangan Kinerja Pengelolaan AM NTB 496582 Pengembangan Kinerja Pengelolaan AM NTT 496369 Pengembangan Kinerja Pengelolaan AM Maluku 496709 Pengembangan Kinerja Pengelolaan AM Maluku Utara 496642 Pengembangan Kinerja Pengelolaan AM Papua 496828 Pengembangan Kinerja Pengelolaan AM Papua Barat
560,908,000 48,362,000 25,332,000 37,761,000 31,095,000 27,791,000 22,016,000 26,154,000 53,610,000 18,625,000 26,099,000 25,299,000 37,409,000 44,333,000 31,866,000 45,633,000 32,532,000 26,991,000
24,484,000 4,183,000 4,968,000 3,785,000 5,906,000 5,642,000 -
585,392,000 48,362,000 25,332,000 41,944,000 31,095,000 27,791,000 26,984,000 29,939,000 59,516,000 18,625,000 26,099,000 25,299,000 37,409,000 49,975,000 31,866,000 45,633,000 32,532,000 26,991,000
86,395,347 1,704,960 1,214,780 12,544,000 1,643,000 1,041,000 9,996,271 19,447,191 10,418,280 3,390,943 1,513,692 1,300,275 609,000 13,145,004 2,931,134 3,727,161 1,537,500 231,156
487,448,653 46,657,040 24,117,220 29,400,000 29,452,000 26,750,000 16,987,729 10,491,809 43,191,720 15,234,057 24,585,308 23,998,725 36,800,000 31,187,996 28,934,866 41,905,839 30,994,500 26,759,844
11,548,000
498,996,653 46,657,040 24,117,220 29,400,000 29,452,000 26,750,000 16,987,729 10,491,809 49,097,720 15,234,057 24,585,308 23,998,725 36,800,000 36,829,996 28,934,866 41,905,839 30,994,500 26,759,844
-
1,387,751,376
62,230,000
1,449,981,376
193,219,490
1,211,579,886
45,182,000
1,256,761,886
-
Satker Pusat 466178 Direktorat Pengembangan Air Minum 448311 Pengembangan Sistem Penyediaan AM IKK
TOTAL
RUPIAH MURNI
SWAKELOLA + AP
RPM
7,950,000 3,308,000
4,166,000
15,210,000 2,000,000
5,906,000
5,642,000
TOTAL
BLM
RPM
-
182,036,178 27,139,175 154,897,003
-
963,859,822 499,133,419 30,873,375 50,510,125 33,524,700 20,032,306 23,796,200 22,707,116 25,068,262 44,424,457 23,100,645 23,673,669 14,128,943 49,675,655 46,949,956 28,986,110 61,681,900
-
464,726,403 32,445,792 24,117,220 29,400,000 29,452,000 26,750,000 16,987,729 18,235,400 43,191,720 15,234,057 18,623,440 23,998,725 36,800,000 31,187,996 28,934,866 31,613,114 30,994,500 26,759,844 1,145,896,000
PHLN
TOTAL -
9,808,000 4,166,000
4,166,000
5,642,000
5,642,000
9,808,000
SISA PAGU KONTRAK
NILAI KONTRAK RPM
182,036,178 27,139,175 154,897,003
158,534,969 25,068,725 133,466,244
973,667,822 503,299,419 30,873,375 50,510,125 33,524,700 20,032,306 23,796,200 22,707,116 25,068,262 48,590,457 23,100,645 23,673,669 14,128,943 49,675,655 46,949,956 28,986,110 61,681,900
880,226,430 461,289,884 28,460,149 44,524,998 29,489,967 18,477,654 21,155,496 21,478,227 24,404,896 42,382,882 21,567,256 23,633,086 13,287,782 45,357,359 43,538,143 23,234,389 60,297,600
470,368,403 32,445,792 24,117,220 29,400,000 29,452,000 26,750,000 16,987,729 18,235,400 43,191,720 15,234,057 18,623,440 23,998,725 36,800,000 36,829,996 28,934,866 31,613,114 30,994,500 26,759,844
418,936,546 31,255,215 23,449,879 23,388,051 27,288,515 22,746,416 16,291,830 17,032,747 36,573,290 14,463,563 18,311,513 22,415,492 25,265,069 27,988,443 27,214,859 31,438,989 29,798,991 24,013,684
1,155,704,000
1,038,761,399
PHLN -
9,808,000 4,166,000
4,166,000
5,642,000
5,642,000
9,808,000
TOTAL
RPM
PHLN
TOTAL
158,534,969 25,068,725 133,466,244
23,501,209 2,070,450 21,430,759
-
23,501,209 2,070,450 21,430,759
890,034,430 465,455,884 28,460,149 44,524,998 29,489,967 18,477,654 21,155,496 21,478,227 24,404,896 46,548,882 21,567,256 23,633,086 13,287,782 45,357,359 43,538,143 23,234,389 60,297,600
83,633,392 37,843,535 2,413,226 5,985,127 4,034,733 1,554,652 2,640,704 1,228,889 663,366 2,041,575 1,533,389 40,583 841,161 4,318,296 3,411,813 5,751,721 1,384,300
-
83,633,392 37,843,535 2,413,226 5,985,127 4,034,733 1,554,652 2,640,704 1,228,889 663,366 2,041,575 1,533,389 40,583 841,161 4,318,296 3,411,813 5,751,721 1,384,300
424,578,546 31,255,215 23,449,879 23,388,051 27,288,515 22,746,416 16,291,830 17,032,747 36,573,290 14,463,563 18,311,513 22,415,492 25,265,069 33,630,443 27,214,859 31,438,989 29,798,991 24,013,684
45,789,857 1,190,577 667,341 6,011,949 2,163,485 4,003,584 695,899 1,202,653 6,618,430 770,494 311,927 1,583,233 11,534,931 3,199,553 1,720,007 174,125 1,195,509 2,746,160
-
45,789,857 1,190,577 667,341 6,011,949 2,163,485 4,003,584 695,899 1,202,653 6,618,430 770,494 311,927 1,583,233 11,534,931 3,199,553 1,720,007 174,125 1,195,509 2,746,160
1,048,569,399
107,134,601
-
107,134,601
PENJELASAN PAKET PEKERJAAN YANG BELUM DILELANGKAN DIREKTORAT PENGEMBANGAN AIR MINUM
NO
1
NAMA SATKER
Pengembangan Air Minum
JUMLAH PAKET 1
PAKET KONTRAK/RINCIAN KEGIATAN
Konsultan Manajemen (UWSSP)
PAGU (Rp)
PENJELASAN BELUM DILELANGKAN
1,000,000 Semula dialokasikan melalui dana dari Loan, saat ini sedang menunggu dialokasikan dana dari Sisa Anggaran Lebih (SAL)
RENCANA PELELANGAN
-
RENCANA PENYERAPAN DAN PROGRES KEUANGAN DIREKTORAT PENGEMBANGAN AIR MINUM STATUS: 18 AGUSTUS 2009 ( X Rp. 1000 )
NO
KODE SATKER
PAGU NAMA SATUAN KERJA RUPIAH MURNI
501380 494931 494993 495044 495364 495081 495260 495163 495302 495220 496055 495596 495684 495741 495817
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
495879 495920 495967 496002 496112 496752 496174 496240 466235 496313 496441 496539 496582 496369 496709 496642 496828
DEVIASI
REALISASI RUPIAH MURNI
PLN
TOTAL
222,714,376 50,864,376 171,850,000
1,000,000 1,000,000 -
223,714,376 51,864,376 171,850,000
137,197,121 32,334,251 104,862,870
66.82 67.78 66.53
72,647,538 28,533,643 44,113,895
38.97 65.00 31.12
76,550,871 22,080,010 54,470,861
Satker Propinsi Wilayah 1 Pengembangan Kinerja Pengelolaan AM NAD Pengembangan Kinerja Pengelolaan AM Sumut Pengembangan Kinerja Pengelolaan AM Sumbar Pengembangan Kinerja Pengelolaan AM Riau Pengembangan Kinerja Pengelolaan AM Kepri Pengembangan Kinerja Pengelolaan AM Jambi Pengembangan Kinerja Pengelolaan AM Bengkulu Pengembangan Kinerja Pengelolaan AM Sumsel Pengembangan Kinerja Pengelolaan AM Babel Pengembangan Kinerja Pengelolaan AM Lampung Pengembangan Kinerja Pengelolaan AM Banten Pengembangan Kinerja Pengelolaan AM Jawa Barat Pengembangan Kinerja Pengelolaan AM Jawa Tengah Pengembangan Kinerja Pengelolaan AM D.I.Y Pengembangan Kinerja Pengelolaan AM Jawa Timur
1,165,037,000 604,129,000 32,563,000 53,036,000 47,652,000 31,637,000 25,395,000 28,158,000 27,145,000 52,940,000 24,478,000 24,891,000 17,506,000 56,565,000 87,046,000 31,023,000 64,094,000
61,230,000 36,746,000 7,950,000 3,308,000 4,166,000 1,251,000 2,861,000 15,210,000 2,000,000
1,226,267,000 640,875,000 32,563,000 53,036,000 55,602,000 34,945,000 25,395,000 28,158,000 27,145,000 57,106,000 24,478,000 24,891,000 18,757,000 59,426,000 102,256,000 31,023,000 66,094,000
908,362,266 439,898,188 18,629,235 47,475,870 35,649,342 30,210,806 14,146,826 17,501,898 21,544,987 41,838,480 18,574,955 19,535,701 15,151,641 26,784,893 60,331,040 23,939,459 48,583,056
86.36 82.63 70.11 96.98 80.78 93.67 72.44 74.98 89.13 82.84 99.02 90.65 90.01 57.29 82.96 88.56 85.62
642,065,605 378,406,173 18,629,292 36,188,386 22,844,650 19,606,894 12,465,800 11,195,877 21,544,987 47,382,123 18,575,130 21,198,075 10,100,534 34,169,950 58,541,613 12,298,875 33,663,987
78.54 67.68 70.11 79.00 50.00 65.00 61.00 46.00 83.00 88.00 82.00 85.00 63.00 67.00 67.00 48.00 62.00
460,822,467 243,606,776 10,018,656 9,619,266 16,684,357 7,741,545 5,994,818 6,234,165 18,434,758 33,201,571 10,490,482 19,843,363 6,295,113 20,133,108 48,606,151 8,177,682 22,131,741
Wilayah 2 Pengembangan Kinerja Pengelolaan AM Kalbar Pengembangan Kinerja Pengelolaan AM Kalteng Pengembangan Kinerja Pengelolaan AM Kalsel Pengembangan Kinerja Pengelolaan AM Kaltim Pengembangan Kinerja Pengelolaan AM Sulut Pengembangan Kinerja Pengelolaan AM Gorontalo Pengembangan Kinerja Pengelolaan AM Sulteng Pengembangan Kinerja Pengelolaan AM Sulsel Pengembangan Kinerja Pengelolaan AM Sulbar Pengembangan Kinerja Pengelolaan AM Sultra Pengembangan Kinerja Pengelolaan AM Bali Pengembangan Kinerja Pengelolaan AM NTB Pengembangan Kinerja Pengelolaan AM NTT Pengembangan Kinerja Pengelolaan AM Maluku Pengembangan Kinerja Pengelolaan AM Maluku Utara Pengembangan Kinerja Pengelolaan AM Papua Pengembangan Kinerja Pengelolaan AM Papua Barat TOTAL
560,908,000 48,362,000 25,332,000 37,761,000 31,095,000 27,791,000 22,016,000 26,154,000 53,610,000 18,625,000 26,099,000 25,299,000 37,409,000 44,333,000 31,866,000 45,633,000 32,532,000 26,991,000 1,387,751,376
24,484,000 4,183,000 4,968,000 3,785,000 5,906,000 5,642,000 62,230,000
585,392,000 48,362,000 25,332,000 41,944,000 31,095,000 27,791,000 26,984,000 29,939,000 59,516,000 18,625,000 26,099,000 25,299,000 37,409,000 49,975,000 31,866,000 45,633,000 32,532,000 26,991,000 1,449,981,376
468,464,078 36,949,698 21,100,174 28,318,492 21,968,910 24,474,700 19,109,752 23,453,322 51,263,087 17,163,390 19,538,453 23,288,832 32,348,467 34,780,101 30,139,869 44,370,667 17,118,338 23,077,826 1,045,559,387
90.44 90.83 94.38 80.42 90.48 98.10 89.33 86.70 91.59 94.05 90.49 98.01 97.51 84.07 95.58 97.89 68.35 96.68 83.34
263,659,432 18,121,567 9,943,007 12,062,074 13,770,421 11,842,320 10,782,502 9,442,464 26,323,823 10,391,244 10,298,961 6,985,479 8,008,967 12,829,933 21,564,936 42,991,543 16,489,408 21,810,783 714,713,143
90.44 90.83 94.38 80.42 90.48 98.10 89.33 86.70 91.59 94.05 90.49 98.01 97.51 84.07 95.58 97.89 68.35 96.68 72.44
217,215,691 12,970,688 13,093,725 11,909,725 14,010,437 7,274,033 11,449,678 8,026,646 22,084,857 5,037,520 12,100,048 6,622,788 13,283,885 10,841,465 24,097,282 7,129,845 19,058,680 18,224,388 537,373,337
Satker Pusat 1 466178 Direktorat Pengembangan Air Minum 2 448311 Pengembangan Sistem Penyediaan AM IKK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
RENCANA PENYERAPAN TARGET PENYERAPAN MINGGU KE-2 BULAN MINGGU KE-2 BULAN AGUSTUS AGUSTUS FISIK FISIK KEUANGAN (RP) KEUANGAN (RP) (%) (%)
KEUANGAN
KEU.
FISIK
%
%
(RP)
%
76,550,871 22,080,010 54,470,861
34.22 42.57 31.70
36.43 43.83 34.20
3,903,332 -6,453,634 10,356,966
1.74 -12.44 6.03
5,835,547 3,807,297 872,250 342,000 2,248,347 344,700 -
466,658,014 247,414,073 10,018,656 9,619,266 17,556,607 8,083,545 5,994,818 6,234,165 18,434,758 35,449,918 10,490,482 19,843,363 6,295,113 20,133,108 48,950,851 8,177,682 22,131,741
38.06 38.61 30.77 18.14 31.58 23.13 23.61 22.14 67.91 62.08 42.86 79.72 33.56 33.88 47.87 26.36 33.49
49.18 49.31 50.46 35.54 32.98 43.78 43.11 27.34 67.46 66.22 48.77 87.06 59.05 52.74 54.16 42.57 41.91
(175,407,591) (130,992,100) -8,610,636 -26,569,120 -5,288,043 -11,523,349 -6,470,982 -4,961,712 -3,110,229 -11,932,205 -8,084,648 -1,354,712 -3,805,421 -14,036,842 -9,590,762 -4,121,193 -11,532,246
-14.30 -20.44 -26.44 -50.10 -9.51 -32.98 -25.48 -17.62 -11.46 -20.89 -33.03 -5.44 -20.29 -23.62 -9.38 -13.28 -17.45
2,028,250 306,000 1,722,250 5,835,547
219,243,941 12,970,688 13,093,725 12,215,725 14,010,437 7,274,033 11,449,678 8,026,646 22,084,857 5,037,520 12,100,048 6,622,788 13,283,885 12,563,715 24,097,282 7,129,845 19,058,680 18,224,388 543,208,884
37.45 26.82 51.69 29.12 45.06 26.17 42.43 26.81 37.11 27.05 46.36 26.18 35.51 25.14 75.62 15.62 58.58 67.52 37.46
49.03 36.78 71.13 30.47 49.43 29.31 47.73 37.17 50.29 42.29 47.02 38.06 64.91 48.00 91.82 15.75 74.87 81.96 47.21
(44,415,492) -5,150,879 3,150,718 153,651 240,016 -4,568,287 667,176 -1,415,818 -4,238,966 -5,353,724 1,801,087 -362,691 5,274,918 -266,218 2,532,346 -35,861,697 2,569,272 -3,586,395 (171,504,259)
-7.59 -10.65 12.44 0.37 0.77 -16.44 2.47 -4.73 -7.12 -28.74 6.90 -1.43 14.10 -0.53 7.95 -78.59 7.90 -13.29 -11.83
PHLN
TOTAL
-
RENCANA DAN REALISASI PENYERAPAN DIREKTORAT PENGEMBANGAN AIR MINUM TAHUN ANGGARAN 2009 1,600,000 1,449,981 1,344,672
1,400,000
1,449,981
1,254,905 1,133,826
1,200,000 DALAM JUTAAN RUPIAH
1,409,412
957,293
1,000,000
PAGU
744,566
800,000
RENCANA REALISASI
600,000
TARGET
506,235
400,000
276,561
200,000 0 -
0
2,355 0 0 JAN
21,106
67,569 27,695 103,571
0 24.463,576 6,248 FEB MAR
APR
543,209 462,830 403,682 363,764 282,365 210,902 141,280
MEI
JUN
JUL
AGT
SEP
OKT
NOP
DES
BULAN
TARGET PENYERAPAN 6 BULAN KEDEPAN KEGIATAN PELAKSANAAN DITJEN CIPTA KARYA TA 2009 Direktorat Air Minum
PELAKSANAAN
(x Rp. 1000)
TOTAL PAGU
JUNI
JULI
AGUSTUS
BULAN SEPTEMBER
OKTOBER
NOPEMBER
DESEMBER
72.44 809,920,623 190,414,958
82.84 1,029,946,391 220,025,769
92.26 1,206,812,091 176,865,700
98.31 1,325,378,247 118,566,156
100.00 1,385,985,312 60,607,065
1,449,981,376 FISIK % KEUANGAN (KOMULATIF) KEUANGAN (ABSOLUTE)
40.56 376,766,199 376,766,199
60.05 619,505,664 242,739,465
PENJELASAN KETERLAMBATAN PENYERAPAN DAN PROGRES KEUANGAN TA. 2009 DIREKTORAT PENGEMBANGAN AIR MINUM STATUS : 18 AGUSTUS 2009
PROGRESS NO
NAMA SATUAN KERJA
ALASAN KETERLAMBATAN KEU.
FISIK
%
%
18.14
35.54 1. Ada 1 SPM yang sedang dalam proses pengajuan sehingga
TINDAK LANJUT
Satker Propinsi 1 PKPAM Sumatera Utara
- Percepatan proses SPM tanggal 25 Agustus selesai
progres mejadi 28 % 2. Ada 2 paket kegiatan yang akan selesai pada tanggal 22 Agustus sehingga rekanan akan menagih pada tangal 25 Agustus 2 PKPAM Kepulauan Riau
23.61
43.11 1. Ada 2 SPM yang sedang diperbaiki karena dikembalikan oleh KPPN (ada Kesalahan)
- Percepatan proses SPM tanggal 25 Agustus selesai
2. Ada 2 paket kontrak dalam proses pengajuan termin 3. Sehingga proses keuangan akan mencapai 31,39%
3 PKPAM Riau
23.13
43.78 1. Keterlambatan proses penagihan termin oleh kontraktor
- Menegur kontraktor untuk segera mengajukan termin
4 PKPAM Jambi
22.14
27.34 1. Pekerjaan pengadaan Genset mengalami tender ulang sehingga progres mengalami keterlambatan
- Percepatan proses tender
5 PKPAM Maluku Utara
15.62
15.75 1. Ada 9 paket sanggah banding sedang dalam proses ulang
PROGRES PELAKSANAAN KEGIATAN DITJEN CIPTA KARYA Direktorat Pengemb. Penyehatan Lingkungan Permukiman A.
Saat ini progres pelaksanaan kegiatan yang telah dicapai yakni :
Direktorat Pengembangan PLP (x 1.000)
Progres Fisik (%) Keuangan (Rp) Keuangan (%)
Rencana penyerapan Minggu Target Penyerapan Minggu Ke-2 Bulan Agustus Ke-2 Bulan Agustus 61.07 436,314,990 50.38
61.07 389,091,266 44.92
Realisasi 38.01 276,631,928 31.94
Deviasi -23.06 (112,459,338) -12.98
LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2009 DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN STATUS: 18 AGUSTUS 2009 NO
KODE SATKER
1
466190
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
494880 494956 495007 495050 495370 495090 495276 495188 495311 495239 496061 448333 495616 495704 495750 495832 495885 495936 495973 496018 496137 496761 496180 496262 466229 496322 496472 496545 496591 496375 496715 496658 496834
PAGU NAMA SATUAN KERJA Satker Pusat Direktorat Pengembangan Penyehatan Lingkungan Permukiman Satker Propinsi Pengemb.Kinerja Pengel. PLP NAD Pengemb.Kinerja Pengel. PLP Sumatera Utara Pengemb.Kinerja Pengel. PLP Sumatera Barat Pengemb.Kinerja Pengel. PLP Riau Pengemb.Kinerja Pengel. PLP Kepulauan Riau Pengemb.Kinerja Pengel. PLP Jambi Pengemb.Kinerja Pengel. PLP Bengkulu Pengemb.Kinerja Pengel. PLP Sumatera Selatan Pengemb.Kinerja Pengel. PLP Bangka Belitung Pengemb.Kinerja Pengel. PLP Lampung Pengemb.Kinerja Pengel. PLP Banten Pengembangan Infrastruktur Persampahan dan Sanitasi Jabodetabek
Pengemb.Kinerja Pengel. PLP Jawa Barat Pengemb.Kinerja Pengel. PLP Jawa Tengah Pengemb.Kinerja Pengel. PLP DI Yogyakarta Pengemb.Kinerja Pengel. PLP Jawa Timur Pengemb.Kinerja Pengel. PLP Kalimantan Barat Pengemb.Kinerja Pengel. PLP Kalimantan Tengah Pengemb.Kinerja Pengel. PLP Kalimantan Selatan Pengemb.Kinerja Pengel. PLP KalimantanTimur Pengemb.Kinerja Pengel. PLP Sulawesi Utara Pengemb.Kinerja Pengel. PLP Gorontalo Pengemb.Kinerja Pengel. PLP Sulawesi Tengah Pengemb.Kinerja Pengel. PLP Sulawesi Selatan Pengemb.Kinerja Pengel. PLP Sulawesi Barat Pengemb.Kinerja Pengel. PLP Sulawesi Tenggara Pengemb.Kinerja Pengel. PLP Bali Pengemb.Kinerja Pengel. PLP NTB Pengemb.Kinerja Pengel. PLP NTT Pengemb.Kinerja Pengel. PLP Maluku Pengemb.Kinerja Pengel. PLP Maluku Utara Pengemb.Kinerja Pengel. PLP Papua Pengemb.Kinerja Pengel. PLP Papua Barat TOTAL
1 2 3 4 5 6 7 8 9 10
Keterangan : Penyiapan Dokumen Lelang Pengumuman Lelang/Prakualifikasi Penyusunan shortlist Undangan Pelelangan Penjelasan Pekerjaan Aanwyzing Pemasukan Penawaran Usulan Pemenang Penetapan Pemenang Penerbitan Surat Perintah Mulai Kerja Penandatangan Kontrak
RUPIAH MURNI
PLN
TOTAL
PAGU (Rp) SWAKELOLA + KONTRAKTUAL AP
PAKET KONTRAK NON FISIK TOTAL FISIK
BLM
33,234,881 33,234,881
22,500,000 22,500,000
55,734,881 55,734,881
16,420,236 16,420,236
39,314,645 39,314,645
-
25 25
606,393,115 15,145,032 24,570,451 20,699,831 6,135,033 8,873,631 9,649,000 6,020,452 11,949,781 8,542,231 7,190,231 8,646,531 14,656,900 60,896,475 37,159,431 30,917,731 111,915,967 7,603,031 6,341,831 28,876,031 15,779,931 8,512,231 8,056,975 6,001,231 25,614,831 8,353,059 6,562,331 45,931,985 22,790,131 7,962,531 6,192,631 4,797,231 6,230,031 7,818,385
204,000,000 100,000,000 15,000,000 35,000,000 2,000,000 52,000,000 -
810,393,115 115,145,032 24,570,451 20,699,831 6,135,033 8,873,631 9,649,000 6,020,452 11,949,781 8,542,231 7,190,231 8,646,531 29,656,900 60,896,475 72,159,431 30,917,731 111,915,967 7,603,031 6,341,831 28,876,031 15,779,931 8,512,231 8,056,975 6,001,231 27,614,831 8,353,059 6,562,331 97,931,985 22,790,131 7,962,531 6,192,631 4,797,231 6,230,031 7,818,385
52,048,591 8,859,852 1,815,751 1,567,081 880,958 848,884 1,121,638 1,342,007 1,547,906 1,001,850 1,015,031 1,113,006 810,800 1,726,195 2,264,421 1,550,546 2,156,053 998,420 1,104,816 1,195,251 1,403,256 1,198,506 1,045,015 1,316,231 1,147,201 1,231,000 1,282,841 4,347,200 1,647,668 996,056 924,631 819,381 820,206 948,933
758,344,524 106,285,180 22,754,700 19,132,750 5,254,075 8,024,747 8,527,362 4,678,445 10,401,875 7,540,381 6,175,200 7,533,525 28,846,100 59,170,280 69,895,010 29,367,185 109,759,914 6,604,611 5,237,015 27,680,780 14,376,675 7,313,725 7,011,960 4,685,000 26,467,630 7,122,059 5,279,490 93,584,785 21,142,463 6,966,475 5,268,000 3,977,850 5,409,825 6,869,452
-
347 13 6 10 6 9 11 8 9 12 10 14 12 15 53 5 24 10 4 7 10 7 5 4 13 9 6 25 5 2 4 4 5 10
639,627,996
226,500,000
866,127,996
68,468,827
797,659,169
-
372
-
JUMLAH PAKET DALAM PROSES PRA KONTRAK 1
2
3
4
5
6
7
-
-
-
-
-
-
-
25 25
1 1
1 1
354 13 17 22 5 3 8 4 8 7 9 10 8 27 24 6 66 3 5 11 10 3 4 6 12 7 11 16 11 6 3 2 4 3
701 26 23 32 11 12 19 12 17 19 19 24 20 42 77 11 90 13 9 18 20 10 9 10 25 16 17 41 16 8 7 6 9 13
135 2 10 8
46 3 1 4
5 3
2 4 4 4 5 2 6 1 8 10 2 37 1
1
1
354
726
136
1
8
3
1 3
1 9 9
1 5 5
22 22
30,892,527 30,892,527.00
11
-
500 18 12 20 11 8 15 7 8 14 17 18 18 18 58 8 50 11 9 13 15 10 7 7 20 16 14 28 11 7 7 6 6 13
479,537,613 61,550,175 18,042,699 16,254,345 5,145,443 7,244,342 7,554,399 4,580,347 9,510,785 7,118,565 5,876,088 7,162,287 11,408,062 38,667,881 22,369,651 25,047,346 72,075,971 6,485,153 5,129,714 25,236,532 13,184,228 6,684,527 6,503,039 3,776,688 21,002,745 6,149,843 4,936,586 16,648,147 17,629,874 6,473,913 5,192,000 3,974,086 4,100,479 6,821,673
-
522
510,430,140
7
1 1
1
1 3 2 8 1
3
47
5
-
-
1
3
NILAI KONTRAK (Rp. x 1.000)
-
1 2
10
1 1
2
5 4 2 2 2
9
12
LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2009 DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN STATUS: 18 AGUSTUS 2009 ( x Rp. 1.000 ) NO
KODE SATKER
1
466190
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
494880 494956 495007 495050 495370 495090 495276 495188 495311 495239 496061 448333 495616 495704 495750 495832 495885 495936 495973 496018 496137 496761 496180 496262 466229 496322 496472 496545 496591 496375 496715 496658 496834
PAGU NAMA SATUAN KERJA Satker Pusat Direktorat Pengembangan Penyehatan Lingkungan Permukiman Satker Propinsi Pengemb.Kinerja Pengel. PLP NAD Pengemb.Kinerja Pengel. PLP Sumatera Utara Pengemb.Kinerja Pengel. PLP Sumatera Barat Pengemb.Kinerja Pengel. PLP Riau Pengemb.Kinerja Pengel. PLP Kepulauan Riau Pengemb.Kinerja Pengel. PLP Jambi Pengemb.Kinerja Pengel. PLP Bengkulu Pengemb.Kinerja Pengel. PLP Sumatera Selatan Pengemb.Kinerja Pengel. PLP Bangka Belitung Pengemb.Kinerja Pengel. PLP Lampung Pengemb.Kinerja Pengel. PLP Banten Pengembangan Infrastruktur Persampahan dan Sanitasi Jabodetabek
Pengemb.Kinerja Pengel. PLP Jawa Barat Pengemb.Kinerja Pengel. PLP Jawa Tengah Pengemb.Kinerja Pengel. PLP DI Yogyakarta Pengemb.Kinerja Pengel. PLP Jawa Timur Pengemb.Kinerja Pengel. PLP Kalimantan Barat Pengemb.Kinerja Pengel. PLP Kalimantan Tengah Pengemb.Kinerja Pengel. PLP Kalimantan Selatan Pengemb.Kinerja Pengel. PLP KalimantanTimur Pengemb.Kinerja Pengel. PLP Sulawesi Utara Pengemb.Kinerja Pengel. PLP Gorontalo Pengemb.Kinerja Pengel. PLP Sulawesi Tengah Pengemb.Kinerja Pengel. PLP Sulawesi Selatan Pengemb.Kinerja Pengel. PLP Sulawesi Barat Pengemb.Kinerja Pengel. PLP Sulawesi Tenggara Pengemb.Kinerja Pengel. PLP Bali Pengemb.Kinerja Pengel. PLP NTB Pengemb.Kinerja Pengel. PLP NTT Pengemb.Kinerja Pengel. PLP Maluku Pengemb.Kinerja Pengel. PLP Maluku Utara Pengemb.Kinerja Pengel. PLP Papua Pengemb.Kinerja Pengel. PLP Papua Barat TOTAL
RUPIAH MURNI
PLN
TOTAL
SWAKELOLA + AP
RPM
PAGU (Rp) KONTRAKTUAL PHLN
PAGU TERKONTRAK TOTAL
RPM
BLM
33,234,881 33,234,881
22,500,000 22,500,000
55,734,881 55,734,881
16,420,236 16,420,236
16,814,645 16,814,645
22,500,000 22,500,000
39,314,645 39,314,645
-
606,393,115 15,145,032 24,570,451 20,699,831 6,135,033 8,873,631 9,649,000 6,020,452 11,949,781 8,542,231 7,190,231 8,646,531 14,656,900 60,896,475 37,159,431 30,917,731 111,915,967 7,603,031 6,341,831 28,876,031 15,779,931 8,512,231 8,056,975 6,001,231 25,614,831 8,353,059 6,562,331 45,931,985 22,790,131 7,962,531 6,192,631 4,797,231 6,230,031 7,818,385
204,000,000 100,000,000 15,000,000 35,000,000 2,000,000 52,000,000 -
810,393,115 115,145,032 24,570,451 20,699,831 6,135,033 8,873,631 9,649,000 6,020,452 11,949,781 8,542,231 7,190,231 8,646,531 29,656,900 60,896,475 72,159,431 30,917,731 111,915,967 7,603,031 6,341,831 28,876,031 15,779,931 8,512,231 8,056,975 6,001,231 27,614,831 8,353,059 6,562,331 97,931,985 22,790,131 7,962,531 6,192,631 4,797,231 6,230,031 7,818,385
52,048,591 8,859,852 1,815,751 1,567,081 880,958 848,884 1,121,638 1,342,007 1,547,906 1,001,850 1,015,031 1,113,006 810,800 1,726,195 2,264,421 1,550,546 2,156,053 998,420 1,104,816 1,195,251 1,403,256 1,198,506 1,045,015 1,316,231 1,147,201 1,231,000 1,282,841 4,347,200 1,647,668 996,056 924,631 819,381 820,206 948,933
554,344,524 6,285,180 22,754,700 19,132,750 5,254,075 8,024,747 8,527,362 4,678,445 10,401,875 7,540,381 6,175,200 7,533,525 13,846,100 59,170,280 34,895,010 29,367,185 109,759,914 6,604,611 5,237,015 27,680,780 14,376,675 7,313,725 7,011,960 4,685,000 24,467,630 7,122,059 5,279,490 41,584,785 21,142,463 6,966,475 5,268,000 3,977,850 5,409,825 6,869,452
204,000,000 100,000,000 -
-
52,000,000 -
758,344,524 106,285,180 22,754,700 19,132,750 5,254,075 8,024,747 8,527,362 4,678,445 10,401,875 7,540,381 6,175,200 7,533,525 28,846,100 59,170,280 69,895,010 29,367,185 109,759,914 6,604,611 5,237,015 27,680,780 14,376,675 7,313,725 7,011,960 4,685,000 26,467,630 7,122,059 5,279,490 93,584,785 21,142,463 6,966,475 5,268,000 3,977,850 5,409,825 6,869,452
639,627,996
226,500,000
866,127,996
68,468,827
571,159,169
226,500,000
797,659,169
-
15,000,000 35,000,000 2,000,000
PHLN
SISA PAGU KONTRAK
NILAI KONTRAK TOTAL
RPM
PHLN
TOTAL
RPM
PHLN
TOTAL
-
16,717,450 16,717,450
15,500,000 15,500,000
32,217,450 32,217,450
15,392,527 15,392,527
15,500,000 15,500,000
30,892,527 30,892,527
1,324,923 1,324,923
-
1,324,923 1,324,923
-
474,063,734 6,285,180 19,383,600 17,134,750 5,254,075 8,024,747 8,132,162 4,678,445 10,335,625 7,540,381 5,975,200 7,233,525 13,739,100 50,416,440 27,663,950 29,367,185 76,056,613 6,600,136 5,237,015 26,678,364 14,076,675 7,313,725 6,515,560 4,285,000 23,667,630 7,122,059 4,979,490 22,867,385 20,255,720 6,912,095 5,268,000 3,977,850 4,216,600 6,869,452
55,853,101 55,853,101 -
529,916,835 62,138,281 19,383,600 17,134,750 5,254,075 8,024,747 8,132,162 4,678,445 10,335,625 7,540,381 5,975,200 7,233,525 13,739,100 50,416,440 27,663,950 29,367,185 76,056,613 6,600,136 5,237,015 26,678,364 14,076,675 7,313,725 6,515,560 4,285,000 23,667,630 7,122,059 4,979,490 22,867,385 20,255,720 6,912,095 5,268,000 3,977,850 4,216,600 6,869,452
423,684,512 5,697,074 18,042,699 16,254,345 5,145,443 7,244,342 7,554,399 4,580,347 9,510,785 7,118,565 5,876,088 7,162,287 11,408,062 38,667,881 22,369,651 25,047,346 72,075,971 6,485,153 5,129,714 25,236,532 13,184,228 6,684,527 6,503,039 3,776,688 21,002,745 6,149,843 4,936,586 16,648,147 17,629,874 6,473,913 5,192,000 3,974,086 4,100,479 6,821,673
55,853,101 55,853,101 -
479,537,613 61,550,175 18,042,699 16,254,345 5,145,443 7,244,342 7,554,399 4,580,347 9,510,785 7,118,565 5,876,088 7,162,287 11,408,062 38,667,881 22,369,651 25,047,346 72,075,971 6,485,153 5,129,714 25,236,532 13,184,228 6,684,527 6,503,039 3,776,688 21,002,745 6,149,843 4,936,586 16,648,147 17,629,874 6,473,913 5,192,000 3,974,086 4,100,479 6,821,673
50,379,222 588,106 1,340,901 880,405 108,632 780,405 577,763 98,098 824,840 421,816 99,112 71,238 2,331,038 11,748,559 5,294,299 4,319,839 3,980,642 114,983 107,301 1,441,832 892,447 629,198 12,521 508,312 2,664,885 972,216 42,904 6,219,238 2,625,846 438,182 76,000 3,764 116,121 47,779
-
50,379,222 588,106 1,340,901 880,405 108,632 780,405 577,763 98,098 824,840 421,816 99,112 71,238 2,331,038 11,748,559 5,294,299 4,319,839 3,980,642 114,983 107,301 1,441,832 892,447 629,198 12,521 508,312 2,664,885 972,216 42,904 6,219,238 2,625,846 438,182 76,000 3,764 116,121 47,779
490,781,184
71,353,101
562,134,285
439,077,039
71,353,101
510,430,140
51,704,145
-
51,704,145
PENJELASAN PAKET PEKERJAAN YANG BELUM DILELANG DIREKTORAT JENDERAL CIPTA KARYA DIREKTORAT PENGEMBANGAN PLP Status 18 Agustus 2009 NO
SATUAN KERJA
JUMLAH PAKET
PAKET KONTRAK/RINCIAN KEGIATAN
1 Direktorat Pengembangan Penyehatan Lingkungan Permukiman
1 Penyusunan Neraca Keuangan 2008 LOAN JICA IP 534 (1 Paket)
2 Pengemb.PLP NAD
2
3 Pengemb.PLP Sumatera Utara
10 Pengadaan Material Pembangunan Fisik Sanimas (7 Paket) Pembangunan Prasarana dan Sarana Sampah Terpadu 3R (1 Paket)
PAGU (Rp)
PENJELASAN BELUM DILELANG
51,320
RENCANA PELELANGAN
PAKET PEMBERDAYAAN 3R (Lokasi)
SANIMAS (Lokasi)
CATATAN
Bulan Mei 2009 2
2 Paket 3R Sudah Kontrak
700,000 Pemberdayaan 195,500 Pemberdayaan
Bulan Mei 2009 Bulan Mei 2009
1
7
800,000 Pemberdayaan
Bulan Mei 2009
4
8
4 Pengemb.PLP Sumatera Barat
8 Pengadaan Material Pembangunan Fisik Sanimas (8 Paket)
5 Pengemb.PLP Kepulauan Riau
2
2
2 Paket 3R Sudah Lelang
6 Pengemb.PLP Bengkulu
4
2
2 Paket 3R Sudah Lelang
7 Pengemb.PLP Jambi
4 Pembangunan Prasarana dan Sarana Sampah Terpadu 3R (Kws. Rajawali Kota Jambi) (1 Paket) Pembangunan Prasarana dan Sarana Sampah Terpadu 3R (Kws. Rajawali Kota Jambi) (1 Paket) Pembangunan Prasarana dan Sarana Sampah Terpadu 3R (Kws. Perumnas Kab. Sarolangun) (1 Paket) Pembangunan Prasarana dan Sarana Sampah Terpadu 3R (Kws. Perumnas Kab. Sarolangun) (1 Paket)
8 Pengemb.PLP Sumatera Selatan
4 Pembangunan Prasarana dan Sarana Sampah Terpadu 3R (1 Paket) Pengadaan Material Pembangunan Fisik Sanimas (3 Paket)
9 Pengemb.PLP Bangka Belitung
5
100,000 Pemberdayaan 97,600 Pemberdayaan 100,000 Pemberdayaan 97,600 Pemberdayaan
200,000 Pemberdayaan 300,000 Pemberdayaan
Bulan Juli 2009
4 Paket 3R Sudah Lelang
2
Bulan Juli 2009 Bulan Juli 2009 Bulan Juli 2009 Bulan Mei 2009 Bulan Mei 2009
1
3
2
2 Paket 3R Sudah Kontrak
10 Pengemb.PLP Lampung
2 Pengadaan Material Pembangunan Fisik Sanimas (2 Paket)
200,000 Pemberdayaan
Bulan Mei 2009
3
2
3 Paket 3R Sudah Kontrak
11 Pengemb.PLP Banten
6 Pengadaan Material Pembangunan Fisik Sanimas (3 Paket)
300,000 Pemberdayaan
Bulan Mei 2009
3
3
3 Paket 3R Sudah Lelang
12
Pengembangan Infrastruktur Persampahan dan Sanitasi Jabodetabek
13 Pengemb.PLP Jawa Barat
1 Dedging at Lower Angke (1 Paket) 8 Pembangunan Prasarana dan Sarana Sampah Terpadu 3R (6 Paket) Pengadaan Material Pembangunan Fisik Sanimas (7 Paket)
15,000,000
Menunggua Loan Agreement ditandatangani
1,500,000 Pemberdayaan 700,000 Pemberdayaan
3 Bulan Mei 2009 Bulan Juni 2009
6
3 Paket 3R Sudah Lelang 7
NO
SATUAN KERJA
14 Pengemb.PLP Jawa Tengah
15 Pengemb.PLP DIY
16 Pengemb.PLP Jawa Timur
JUMLAH PAKET
PAKET KONTRAK/RINCIAN KEGIATAN
PAGU (Rp)
PENJELASAN BELUM DILELANG
RENCANA PELELANGAN
PAKET PEMBERDAYAAN 3R (Lokasi)
SANIMAS (Lokasi)
10 Pembangunan Prasarana dan Sarana Sampah Terpadu 3R (5 Paket) Pengadaan Material Pembangunan Fisik Sanimas (20 Paket)
500,000 Pemberdayaan 2,000,000 Pemberdayaan
Bulan Mei 2009 Bulan Mei 2009
5
20
2 Pembangunan Prasarana dan Sarana Sampah Terpadu 3R (1 Paket) Pengadaan Material Pembangunan Fisik Sanimas (3 Paket)
200,000 Pemberdayaan 300,000 Pemberdayaan
Bulan Mei 2009 Bulan Mei 2009
1
3
2,900,000 Pemberdayaan
Bulan Mei 2009
8
35
Pengembangan Infrastruktur PLP 37 Pengadaan Material Pembangunan Fisik Sanimas (35 Paket)
CATATAN
5 Paket 3R sudah Kontrak 6 Paket 3R sudah Lelang
17 Pengemb.PLP Kalimantan Barat
1
18 Pengemb.PLP Kalimantan Selatan
5 Pembangunan Prasarana Sarana sampah terpadu 3R (2 Paket) Pengadaan Material Pembangunan Fisik Sanimas (3 Paket)
623,125 Pemberdayaan 300,000 Pemberdayaan
Bulan Mei 2009 Bulan Juni 2009
2
3
19 Pengemb.PLP KalimantanTimur
4 Pembangunan Prasarana Sarana sampah terpadu 3R (2 Paket) Pengadaan Material Pembangunan Fisik Sanimas (3 Paket)
200,000 Pemberdayaan 300,000 Pemberdayaan
Bulan Mei 2009 Bulan Juni 2009
1
3
20 Pengemb.PLP Gorontalo
2 Pembangunan Prasarana Sarana sampah terpadu 3R (1 Paket)
298,260 Pemberdayaan
Bulan Mei 2009
1
2
Pengadaan Material Pembangunan Fisik Sanimas (2 Paket)
198,140 Pemberdayaan
Bulan Juni 2009
21 Pengemb.PLP Sulawesi Tengah
2 Pembangunan Pasarana Sarana Sampah Terpadu 3R (2 Paket)
300,000 Pemberdayaan
Bulan Mei 2009
2
22 Pengemb.PLP Sulawesi Selatan
2 Pembangunan Prasarana Sarana sampah terpadu 3R (2 Paket) Pengadaan Material Pembangunan Fisik Sanimas (2 Paket)
200,000 Pemberdayaan 200,000 Pemberdayaan
Bulan Mei 2009 Bulan Juli 2009
2
2
23 Pengemb.PLP Sulawesi Tenggara
1 Pengadaan Material Pembangunan Fisik Sanimas(1 Paket)
300,000 Pemberdayaan
Bulan Juli 2009
1
3
1 Paket 3R Sudah Kontrak
24 Pengemb.PLP Bali
Pengembangan Infrastruktur PLP 5 Pengadaan Material Pembangunan Fisik Sanimas (2 Paket)
200,000
Bulan Juni 2009
3
2
3 Paket 3R sudah Lelang
25 Pengemb.PLP NTB
5 Pembangunan Pasarana Sarana Sampah Terpadu 3R (2 Paket) Pengadaan Material Pembangunan Fisik Sanimas (3 Paket)
586,743 Pemberdayaan 200,000 Pemberdayaan
Bulan Juli 2009 Bulan Juni 2009
2
4
1 Paket Sanimas Sudah Kontrak
26 Pengemb.PLP Papua
3 Pembangunan Pasarana Sarana Sampah Terpadu 3R (3 Paket)
291,300 Pemberdayaan
Bulan Juni 2009
2
TOTAL PAKET
136
1
60
1 Paket 3R Sudah Lelang
107
RENCANA PENYERAPAN DAN PROGRES KEUANGAN DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN STATUS: 18 AGUSTUS 2009 ( X Rp. 1000 )
NO
KODE SATKER
PAGU NAMA SATUAN KERJA RUPIAH MURNI
1
Satker Pusat 466190 Direktorat Pengembangan Penyehatan Lingkungan Permukiman
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
494880 494956 495007 495050 495370 495090 495276 495188 495311 495239 496061 448333 495616 495704 495750 495832 495885 495936 495973 496018 496137 496761 496180 496262 466229 496322 496472 496545 496591 496375 496715 496658 496834
Satker Propinsi Pengemb.Kinerja Pengel. PLP NAD Pengemb.Kinerja Pengel. PLP Sumatera Utara Pengemb.Kinerja Pengel. PLP Sumatera Barat Pengemb.Kinerja Pengel. PLP Riau Pengemb.Kinerja Pengel. PLP Kepulauan Riau Pengemb.Kinerja Pengel. PLP Jambi Pengemb.Kinerja Pengel. PLP Bengkulu Pengemb.Kinerja Pengel. PLP Sumatera Selatan Pengemb.Kinerja Pengel. PLP Bangka Belitung Pengemb.Kinerja Pengel. PLP Lampung Pengemb.Kinerja Pengel. PLP Banten Pengembangan Infrastruktur Persampahan dan Sanitasi Jabodetabek Pengemb.Kinerja Pengel. PLP Jawa Barat Pengemb.Kinerja Pengel. PLP Jawa Tengah Pengemb.Kinerja Pengel. PLP DI Yogyakarta Pengemb.Kinerja Pengel. PLP Jawa Timur Pengemb.Kinerja Pengel. PLP Kalimantan Barat Pengemb.Kinerja Pengel. PLP Kalimantan Tengah Pengemb.Kinerja Pengel. PLP Kalimantan Selatan Pengemb.Kinerja Pengel. PLP KalimantanTimur Pengemb.Kinerja Pengel. PLP Sulawesi Utara Pengemb.Kinerja Pengel. PLP Gorontalo Pengemb.Kinerja Pengel. PLP Sulawesi Tengah Pengemb.Kinerja Pengel. PLP Sulawesi Selatan Pengemb.Kinerja Pengel. PLP Sulawesi Barat Pengemb.Kinerja Pengel. PLP Sulawesi Tenggara Pengemb.Kinerja Pengel. PLP Bali Pengemb.Kinerja Pengel. PLP NTB Pengemb.Kinerja Pengel. PLP NTT Pengemb.Kinerja Pengel. PLP Maluku Pengemb.Kinerja Pengel. PLP Maluku Utara Pengemb.Kinerja Pengel. PLP Papua Pengemb.Kinerja Pengel. PLP Papua Barat TOTAL
PLN
TOTAL
RENCANA PENYERAPAN TARGET PENYERAPAN MINGGU KE-2 BULAN MINGGU KE-2 BULAN AGUSTUS AGUSTUS FISIK FISIK KEUANGAN (RP) KEUANGAN (RP) (%) (%)
REALISASI RUPIAH MURNI
PHLN
DEVIASI
TOTAL
KEU.
FISIK
%
%
KEUANGAN (RP)
%
33,234,881 33,234,881
22,500,000 22,500,000
55,734,881 55,734,881
25,002,668 25,002,668
55.00 55.00
24,007,139 24,007,139
55.00 55.00
7,579,055 7,579,055
3,126,648 3,126,648
10,705,703 10,705,703
19.21 19.21
30.07 30.07
(13,301,436) -13,301,436
-23.87 -23.87
606,393,115 15,145,032 24,570,451 20,699,831 6,135,033 8,873,631 9,649,000 6,020,452 11,949,781 8,542,231 7,190,231 8,646,531 14,656,900 60,896,475 37,159,431 30,917,731 111,915,967 7,603,031 6,341,831 28,876,031 15,779,931 8,512,231 8,056,975 6,001,231 25,614,831 8,353,059 6,562,331 45,931,985 22,790,131 7,962,531 6,192,631 4,797,231 6,230,031 7,818,385
204,000,000 100,000,000 15,000,000 35,000,000 2,000,000 52,000,000 -
810,393,115 115,145,032 24,570,451 20,699,831 6,135,033 8,873,631 9,649,000 6,020,452 11,949,781 8,542,231 7,190,231 8,646,531 29,656,900 60,896,475 72,159,431 30,917,731 111,915,967 7,603,031 6,341,831 28,876,031 15,779,931 8,512,231 8,056,975 6,001,231 27,614,831 8,353,059 6,562,331 97,931,985 22,790,131 7,962,531 6,192,631 4,797,231 6,230,031 7,818,385
411,312,323 53,707,890 11,477,867 9,468,594 2,988,203 4,007,605 4,581,130 2,881,289 5,698,319 4,159,198 3,419,464 5,985,129 13,304,085 36,568,333 41,430,337 17,406,683 63,115,010 4,648,493 3,280,946 19,011,979 6,548,671 3,745,382 3,995,857 3,672,153 14,350,047 5,010,165 4,284,546 35,069,444 11,470,273 3,088,268 3,375,913 1,687,906 3,426,829 4,446,316
61.49 58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 80.00 58.00 70.00 65.00 65.00 65.00 73.00 63.00 78.00 47.00 52.00 60.00 72.00 65.00 70.00 75.00 50.00 62.00 50.00 67.00 50.00 66.00 69.00
365,084,127 46,736,571 10,352,996 10,804,794 2,633,075 3,682,902 5,708,843 2,638,536 5,264,892 5,294,162 4,249,457 4,738,732 12,109,879 30,769,536 31,250,193 12,700,482 64,469,857 3,255,492 3,874,780 16,647,200 9,442,952 4,950,981 3,544,467 2,635,364 15,653,703 4,868,035 3,042,250 15,332,897 10,075,212 3,412,389 4,327,130 2,931,146 3,235,574 4,449,648
61.49 58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 80.00 58.00 70.00 65.00 65.00 65.00 73.00 63.00 78.00 47.00 52.00 60.00 72.00 65.00 70.00 75.00 50.00 62.00 50.00 67.00 50.00 66.00 69.00
211,448,306 1,836,245 8,341,862 9,054,191 3,160,733 5,994,818 4,667,310 1,308,720 2,510,526 3,574,605 2,637,319 3,882,085 236,376 17,774,004 15,495,920 4,648,346 45,889,726 1,630,953 3,067,481 14,765,694 8,166,680 3,541,808 835,540 1,289,063 13,763,893 1,746,882 1,928,629 9,246,512 9,165,507 1,712,323 2,786,490 1,195,865 2,577,250 3,014,948
54,477,919 54,477,919 -
265,926,225 56,314,164 8,341,862 9,054,191 3,160,733 5,994,818 4,667,310 1,308,720 2,510,526 3,574,605 2,637,319 3,882,085 236,376 17,774,004 15,495,920 4,648,346 45,889,726 1,630,953 3,067,481 14,765,694 8,166,680 3,541,808 835,540 1,289,063 13,763,893 1,746,882 1,928,629 9,246,512 9,165,507 1,712,323 2,786,490 1,195,865 2,577,250 3,014,948
32.81 48.91 33.95 43.74 51.52 67.56 48.37 21.74 21.01 41.85 36.68 44.90 0.80 29.19 21.47 15.03 41.00 21.45 48.37 51.13 51.75 41.61 10.37 21.48 49.84 20.91 29.39 9.44 40.22 21.50 45.00 24.93 41.37 38.56
38.56 40.08 48.74 54.06 53.39 67.56 56.29 27.62 23.39 65.00 61.73 52.04 0.87 55.40 22.51 31.51 44.15 20.25 85.72 66.09 67.28 46.01 29.42 13.48 67.18 54.39 37.78 11.81 40.55 14.39 56.42 45.92 49.94 40.25
(99,157,902) 9,577,594 -2,011,134 -1,750,603 527,658 2,311,915 -1,041,533 -1,329,816 -2,754,366 -1,719,557 -1,612,138 -856,647 -11,873,503 -12,995,532 -15,754,273 -8,052,136 -18,580,131 -1,624,539 -807,299 -1,881,505 -1,276,272 -1,409,173 -2,708,927 -1,346,301 -1,889,810 -3,121,153 -1,113,621 -6,086,385 -909,705 -1,700,066 -1,540,640 -1,735,281 -658,324 -1,434,701
-12.24 8.32 -8.19 -8.46 8.60 26.05 -10.79 -22.09 -23.05 -20.13 -22.42 -9.91 -40.04 -21.34 -21.83 -26.04 -16.60 -21.37 -12.73 -6.52 -8.09 -16.55 -33.62 -22.43 -6.84 -37.37 -16.97 -6.21 -3.99 -21.35 -24.88 -36.17 -10.57 -18.35
639,627,996
226,500,000
866,127,996
436,314,990
61.07
389,091,266
61.07
219,027,360
57,604,567
276,631,928
31.94
38.01
(112,459,338)
-12.98
RENCANA DAN REALISASI PENYERAPAN DIREKTORAT PENYEHATAN LINGKUNGAN DAN PERMUKIMAN TAHUN ANGGARAN 2009 1,000,000 866,128
900,000
866,128 760,528
DALAM JUTAAN RUPIAH
800,000 700,000
844,332
638,592
600,000 490,660
500,000
RENCANA
381,970
400,000
REALISASI TARGET
254,542
300,000 200,000
128,673
100,000
11,700
-
PAGU
0
0
0 JAN
25,492
49,969
79,392
276,632
184,294 134,048 117,663 89,187
15,468 57,13969,717 42,422 0 427 4,70114,955 FEB MAR APR MEI JUN
JUL
AGT
SEP
OKT
NOP
DES
BULAN
TARGET PENYERAPAN 6 BULAN KEDEPAN KEGIATAN PELAKSANAAN DITJEN CIPTA KARYA TA 2009 Direktorat PLP
PELAKSANAAN
(x Rp. 1000)
TOTAL PAGU
JUNI
JULI
AGUSTUS
BULAN SEPTEMBER
OKTOBER
NOPEMBER
DESEMBER
866,127,996 FISIK % KEUANGAN (KOMULATIF) KEUANGAN (ABSOLUTE)
32.56 175,978,410 175,978,410
47.04 317,447,176 141,468,766
61.07 460,735,357 143,288,181
77.01 602,677,666 141,942,310
90.82 721,022,520 118,344,854
97.62 810,660,387 89,637,867
100.00 866,127,996 55,467,609
PENJELASAN KETERLAMBATAN PENYERAPAN DAN PROGRES KEUANGAN TA. 2009 DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN STATUS : 18 AGUSTUS 2009
PROGRESS NO
NAMA SATUAN KERJA
ALASAN KETERLAMBATAN KEU.
FISIK
%
%
21.74
27.62 1. Pada paket TPA belum dilakukannya pemasangan geomembran
TINDAK LANJUT
Satker Propinsi 1 Pengemb. PLP Bengkulu
2 Pengemb. PLP Sumatera Selatan
21.10
- Percepatan pemasangan geomembran
2. Kesiapan RPIJM untuk revisi penghapusan tanda bintang POK
- Percepatan penyelesaian RPIJM dan revisi penghapusan tanda bintang POK
3. Pada Paket TPA, belum dilakukannya pemasangang Geomembran
- Percepatan pemasangan geomembran
23.39 1. Pada Paket TPA, belum dilakukannya pemasangang Geomembran ( sedang menunggu pipa yang belum datang)
- Percepatan pemasangan geomembran
2. Belum dilakukannya pembebasan lahan lahan pada peket pembangunan
- Percepatan proses pembebasan lahan
drainase 3. Paket yang masih dalam status persiapan lelang, yaitu paket : - Pembangunan Persampahan Terpadu 3R (1 Paket) - Pengadaan Material Pembangunan Fisik Sanimas (3 Paket) 3 Pengembangan Infrastruktur Persampahan dan Sanitasi Jabodetabek
4 Pengemb. PLP Jawa Tengah
0.80
21.47
0.87 1. Menunggu penandatanganan Loan Agreement pada paket Dedging at Lower Angke 2. Paket yang sudah kontrak , yaitu paket : - Pembangunan Persampahan Terpadu 3R (3 Paket) - Perencanaan Teknis Pembangunan Persampahan 3R (3 Paket) - Pembuatan Saluran Drainase Kolam Retensi (1 Paket) - Supervisi Pembuatan Saluran Drainase Kolam Retensi (1 Paket) - Bantek Penanganan Sampah Pada Daerah Aliran Sungai (1 Paket) - Out Plan Drainase Pada Subsistem Kali Sugutamu (1 Paket) - Bantek Penyiapan Pembangunan TPA Nambo (1 Paket) - Bantek Peningkatan Pengelolaan TPST 3R di Halim (1 Paket) - Bantek Pengelolaan Air Limbah Domestik Skala Kawasan (1 Paket) - Review MP dan DED Air Limbah Kota (1 Paket)
22.51 1. Paket Drainase Semarang dalam proses lelang (JBIC) 2. Paket yang masih dalam status persiapan lelang, yaitu paket : - Pembangunan Prasarana dan Sarana Sampah Terpadu 3R (5 Paket) - Pengadaan Material Pembangunan Fisik Sanimas (20 Paket)
- Kemungkinan besar Loan Agreement tidak bisa selesai TA. 2009 sehingga perlu revisi DIPA penghapusan pencatatan - Saat ini dalam proses penarikan uang muka termin I
- Monitoring ketat percepatan proses lelang
PROGRESS NO
NAMA SATUAN KERJA
ALASAN KETERLAMBATAN
TINDAK LANJUT
KEU.
FISIK
%
%
5 Pengemb. PLP DI Yogyakarta
15.03
31.51 1. Adanya masa sanggah banding dalam paket pengadaan bulldozer 2. Paket yang masih dalam status persiapan lelang, yaitu paket : - Pembangunan Prasarana dan Sarana Sampah Terpadu 3R (1 Paket) - Pengadaan Material Pembangunan Fisik Sanimas (3 Paket)
- Mempercepat proses retender - Monitoring ketat percepatan proses lelang
6 Pengemb.Kinerja Pengel. PLP Kalimantan Barat
21.45
20.25 - Lambatnya pihak Konsultan dalam proses administrasi penarikan
- Satker akan berusaha menekan pihak konsultan untuk segera melakukan
keuangan
7 Pengemb. PLP Gorontalo
10.37
29.42 1. Sulitnya mobilitas alat dari Depo ke lokasi TPA Regional di Ds. Talumelito
penarikan keuangan
- Monitoring ketat terhadap kontraktor TPA Regional Talumelito (multiyears 2008-2009)
2. Alat Berat Bulldozer dan Vibrator menunggu daftar antri (sewa)
- Telah dilakukan monitoring oleh Dit. PLP pada tanggal 10 Juni 2009
3. Paket yang masih dalam status persiapan lelang, yaitu paket :
- Monitoring ketat percepatan proses lelang
- Pembangunan Prasarana Sarana Sampah Terpadu 3R (1 Paket) - Pengadaan Material Pembangunan Fisik Sanimas (2 Paket) 8 Pengemb. PLP Sulawesi Tengah
21.48
13.48 - Lambatnya pihak Konsultan dalam proses administrasi penarikan keuangan
9 Pengemb. PLP Sulawesi Barat
20.91
53.39 - Adanya pergantian petugas E-Mon. Petugas E-Mon yang lama tidak mau
- Satker akan berusaha menekan pihak konsultan untuk segera melakukan penarikan keuangan - Petugas E-Mon yang baru segeran membuat User ID Sulbar yang baru
memberikan User ID E-Mon Sulbar 10 Pengemb. PLP Bali
9.44
11.81 1. Paket DSDP dalam proses lelang (sudah pemasukan penawaran)
- Monitoring ketat percepatan proses lelang ( diperkirakan akhir November 2009 sudah bisa melakukan penarikan uang)
2. Paket yang masih dalam status proses lelang, yaitu paket : - Pembangunan Prasarana Sarana Sampah Terpadu 3R (3 Paket) - Pembangunan dan Pengadaan PS Persampahan Tukad Badung - Pembangunan Drainase Tukad Mati - Uji Coba Pengelolaan TPA Regional Bangli - Perencanaan Teknis Peralatan Pembersih Pantai - Pengadaan Peralatan Laboratorium IPAL DSDP - Pengadaan Alat Bantu Kerj O & M DSDP - DSDP II - ICB 1 - DSDP II - ICB 2 3. Paket yang masih dalam status persiapan lelang, yaitu paket : - Pengadaan Material Pembangunan Fisik Sanimas (2 Paket) 11 Pengemb. PLP NTT
21.50
14.39 - Lambatnya pihak Konsultan dalam proses administrasi penarikan keuangan
12 Pengemb. PLP Maluku Utara
24.93
45.92 - Lambatnya pihak Konsultan dalam proses administrasi penarikan keuangan
- Monitoring ketat percepatan proses lelang
- Satker akan berusaha menekan pihak konsultan untuk segera melakukan penarikan keuangan - Satker akan berusaha menekan pihak konsultan untuk segera melakukan penarikan keuangan
PROGRES PELAKSANAAN KEGIATAN DITJEN CIPTA KARYA Direktorat Pengembangan Permukiman A.
Saat ini progres pelaksanaan kegiatan yang telah dicapai yakni :
Direktorat Pengembangan Permukiman (x 1.000)
Progres Fisik (%) Keuangan (Rp) Keuangan (%)
Rencana penyerapan Minggu Target Penyerapan Minggu Ke-2 Bulan Agustus Ke-2 Bulan Agustus 84.33 770,966,835 76.65
76.83 689,031,951 68.50
Realisasi 66.34 546,526,123 54.34
Deviasi -10.49 (142,505,829) -14.17
LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2009 DIREKTORAT PENGEMBANGAN PERMUKIMAN STATUS: 18 AGUSTUS 2009 PAGU
NO
KODE SATKER
1 2 3 4
452771 488822 493181 487760
Satker Pusat Pengembangan Permukiman Penyediaan PS Agropolitan Pelaksanaan Pengembangan Permukiman (Rusunawa) Pembinaan Teknis Penataan Lingkungan Permukiman (NUSSP)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
NAMA SATUAN KERJA
TOTAL
595,073,783 49,604,647 22,301,130 514,730,296 8,437,710
67,800,000 67,800,000
662,873,783 49,604,647 22,301,130 514,730,296 76,237,710
35,211,795 21,446,647 4,007,642 6,219,796 3,537,710
627,661,988 28,158,000 18,293,488 508,510,500 72,700,000
486479 486485 486491 486505 493336 486511 486686 486520 487723 486536 487732 486432 486448 486454 486460
SATKER PROPINSI 332,960,157 Wilayah 1 173,050,099 Pengembangan Kawasan Permukiman & Perbatasan Nanggroe Aceh Darussalam 10,034,684 Pengembangan Kawasan Permukiman & Perbatasan Sumatera Utara 11,590,064 Pengembangan Kawasan Permukiman Sumatera Barat 5,825,630 Pengembangan Kawasan Permukiman & Perbatasan Riau 9,921,051 Pengembangan Kawasan Permukiman & Perbatasan Kepulauan Riau 15,637,078 Pengembangan Kawasan Permukiman Jambi 4,741,532 Pengembangan Kawasan Permukiman Bengkulu 5,419,990 Pengembangan Kawasan Permukiman Sumatera Selatan 8,537,298 Pengembangan Kawasan Permukiman Bangka Belitung 4,937,372 Pengembangan Kawasan Permukiman Lampung 6,993,206 Pengembangan Kawasan Permukiman Banten 7,082,360 Pengembangan Kawasan Permukiman Jawa Barat 9,525,872 Pengembangan Kawasan Permukiman Jawa Tengah 28,137,654 Pengembangan Kawasan Permukiman D.I.Yogyakarta 32,942,140 Pengembangan Kawasan Permukiman Jawa Timur 11,724,168
10,000,000 10,000,000 10,000,000 -
342,960,157 183,050,099 20,034,684 11,590,064 5,825,630 9,921,051 15,637,078 4,741,532 5,419,990 8,537,298 4,937,372 6,993,206 7,082,360 9,525,872 28,137,654 32,942,140 11,724,168
38,020,118 16,885,141 2,377,129 1,129,139 932,236 1,529,351 1,581,950 778,253 954,245 1,048,807 694,939 858,521 863,695 798,388 1,403,458 1,041,627 893,403
294,940,039 156,164,958 7,657,555 10,460,925 4,893,394 8,391,700 14,055,128 3,963,279 4,465,745 7,488,491 4,242,433 6,134,685 6,218,665 8,727,484 26,734,196 31,900,513 10,830,765
486542 486551 486567 486573 486582 487748 486598 486602 452796 486618 486649 486655 486661 486624 486630 486670 493769
Wilayah 2 159,910,058 Pengembangan Kawasan Permukiman & Perbatasan Kalimantan Barat 17,186,303 Pengembangan Kawasan Permukiman Kalimantan Tengah 6,809,303 Pengembangan Kawasan Permukiman Kalimantan Selatan 8,837,512 Pengembangan Kawasan Permukiman & Perbatasan Kalimantan Timur 17,917,763 Pengembangan Kawasan Permukiman & Perbatasan Sulawesi Utara 15,069,984 Pengembangan Kawasan Permukiman Gorontalo 5,653,611 Pengembangan Kawasan Permukiman Sulawesi Tengah 6,483,403 Pengembangan Kawasan Permukiman Sulawesi Selatan 8,826,762 Pengembangan Kawasan Permukiman Sulawesi Barat 4,719,784 Pengembangan Kawasan Permukiman Sulawesi Tenggara 7,909,727 Pengembangan Kawasan Permukiman Bali 6,238,511 Pengembangan Kawasan Permukiman Nusa Tenggara Barat 6,950,647 Pengembangan Kawasan Permukiman & Perbatasan Nusa Tenggara Timur 10,385,540 Pengembangan Kawasan Permukiman & Perbatasan Maluku 10,784,110 Pengembangan Kawasan Permukiman & Perbatasan Maluku Utara 9,310,164 Pengembangan Kawasan Permukiman & Perbatasan Papua 9,499,508 Pengembangan Kawasan Permukiman & Perbatasan Papua Barat 7,327,426
-
159,910,058 17,186,303 6,809,303 8,837,512 17,917,763 15,069,984 5,653,611 6,483,403 8,826,762 4,719,784 7,909,727 6,238,511 6,950,647 10,385,540 10,784,110 9,310,164 9,499,508 7,327,426
21,134,977 1,238,192 787,940 787,687 1,652,800 1,435,611 902,910 2,847,453 989,367 775,410 1,229,303 836,348 883,517 1,507,120 1,335,644 1,311,590 1,369,093 1,244,992
138,775,081 15,948,111 6,021,363 8,049,825 16,264,963 13,634,373 4,750,701 3,635,950 7,837,395 3,944,374 6,680,424 5,402,163 6,067,130 8,878,420 9,448,466 7,998,574 8,130,415 6,082,434
77,800,000
1,005,833,940
73,231,913
922,602,027
TOTAL 1 2 3 4 5 6 7 8 9 10
PAGU (Rp) SWAKELOLA + KONTRAKTUAL AP
PLN
Keterangan : Penyiapan Dokumen Lelang Pengumuman Lelang/Prakualifikasi Penyusunan shortlist Undangan Pelelangan Penjelasan Pekerjaan Aanwyzing Pemasukan Penawaran Usulan Pemenang Penetapan Pemenang Penerbitan Surat Perintah Mulai Kerja Penandatangan Kontrak
RUPIAH MURNI
928,033,940
PAKET KONTRAK NON FISIK TOTAL FISIK
BLM 10,000,000 10,000,000 10,000,000 10,000,000
JUMLAH PAKET DALAM PROSES PRA KONTRAK 1
2
3
-
155 18 42 73 22
-
-
-
422 204 13 13 16 7 17 10 8 13 11 14 11 15 26 17 13
425 218 15 15 12 22 14 15 10 13 6 9 12 13 29 17 16
847 422 28 28 28 29 31 25 18 26 17 23 23 28 55 34 29
-
-
-
218 16 9 15 17 10 10 8 14 6 19 12 24 21 12 6 10 9
207 14 12 12 11 23 10 16 18 10 13 9 9 14 13 10 6 7
425 30 21 27 28 33 20 24 32 16 32 21 33 35 25 16 16 16
` -
-
512
490
1,002
-
-
90 16 17 35 22
65 2 25 38
4
5
6
7
8
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
9
10 4 4
NILAI KONTRAK (Rp. x 1.000)
-
151 14 42 73 22
574,311,226 12,659,478 16,598,737 472,758,413 72,294,598
-
-
-
-
-
847 422 28 28 28 29 31 25 18 26 17 23 23 28 55 34 29
262,857,188 137,834,257 6,234,387 9,905,650 3,796,461 6,637,495 12,775,122 3,618,530 4,431,258 7,047,800 3,455,224 6,033,787 6,192,535 6,874,969 23,765,276 29,606,043 7,459,720
-
-
-
-
-
-
425 30 21 27 28 33 20 24 32 16 32 21 33 35 25 16 16 16
125,022,931 15,367,530 5,929,220 7,551,346 12,385,282 11,401,334 4,126,376 4,956,409 6,215,394 2,939,594 6,601,007 4,593,051 4,473,045 7,701,642 8,944,775 7,890,525 7,907,982 6,038,419
-
-
-
-
-
998
837,168,414
4
LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2009 DIREKTORAT PENGEMBANGAN PERMUKIMAN STATUS: 18 AGUSTUS 2009 ( x Rp. 1.000 ) NO
KODE SATKER
PAGU NAMA SATUAN KERJA
RUPIAH MURNI
PLN
TOTAL
SWAKELOLA + AP
RPM
PAGU (Rp) KONTRAKTUAL PHLN
1 2 3 4
452771 488822 493181 487760
Satker Pusat Pengembangan Permukiman Penyediaan PS Agropolitan Pelaksanaan Pengembangan Permukiman (Rusunawa) Pembinaan Teknis Penataan Lingkungan Permukiman (NUSSP)
595,073,783 49,604,647 22,301,130 514,730,296 8,437,710
67,800,000 67,800,000
662,873,783 49,604,647 22,301,130 514,730,296 76,237,710
35,211,795 21,446,647 4,007,642 6,219,796 3,537,710
559,861,988 28,158,000 18,293,488 508,510,500 4,900,000
486479 486485 486491 486505 493336 486511 486686 486520 487723 486536 487732 486432 486448 486454 486460
SATKER PROPINSI 332,960,157 Wilayah 1 173,050,099 Pengembangan Kawasan Permukiman & Perbatasan Nanggroe Aceh Darussalam 10,034,684 Pengembangan Kawasan Permukiman & Perbatasan Sumatera Utara 11,590,064 Pengembangan Kawasan Permukiman Sumatera Barat 5,825,630 Pengembangan Kawasan Permukiman & Perbatasan Riau 9,921,051 Pengembangan Kawasan Permukiman & Perbatasan Kepulauan Riau 15,637,078 Pengembangan Kawasan Permukiman Jambi 4,741,532 Pengembangan Kawasan Permukiman Bengkulu 5,419,990 Pengembangan Kawasan Permukiman Sumatera Selatan 8,537,298 Pengembangan Kawasan Permukiman Bangka Belitung 4,937,372 Pengembangan Kawasan Permukiman Lampung 6,993,206 Pengembangan Kawasan Permukiman Banten 7,082,360 Pengembangan Kawasan Permukiman Jawa Barat 9,525,872 Pengembangan Kawasan Permukiman Jawa Tengah 28,137,654 Pengembangan Kawasan Permukiman D.I.Yogyakarta 32,942,140 Pengembangan Kawasan Permukiman Jawa Timur 11,724,168
10,000,000 10,000,000 10,000,000 -
342,960,157 183,050,099 20,034,684 11,590,064 5,825,630 9,921,051 15,637,078 4,741,532 5,419,990 8,537,298 4,937,372 6,993,206 7,082,360 9,525,872 28,137,654 32,942,140 11,724,168
38,020,118 16,885,141 2,377,129 1,129,139 932,236 1,529,351 1,581,950 778,253 954,245 1,048,807 694,939 858,521 863,695 798,388 1,403,458 1,041,627 893,403
294,940,039 156,164,958 7,657,555 10,460,925 4,893,394 8,391,700 14,055,128 3,963,279 4,465,745 7,488,491 4,242,433 6,134,685 6,218,665 8,727,484 26,734,196 31,900,513 10,830,765
-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
486542 486551 486567 486573 486582 487748 486598 486602 452796 486618 486649 486655 486661 486624 486630 486670 493769
Wilayah 2 159,910,058 Pengembangan Kawasan Permukiman & Perbatasan Kalimantan Barat 17,186,303 Pengembangan Kawasan Permukiman Kalimantan Tengah 6,809,303 Pengembangan Kawasan Permukiman Kalimantan Selatan 8,837,512 Pengembangan Kawasan Permukiman & Perbatasan Kalimantan Timur 17,917,763 Pengembangan Kawasan Permukiman & Perbatasan Sulawesi Utara 15,069,984 Pengembangan Kawasan Permukiman Gorontalo 5,653,611 Pengembangan Kawasan Permukiman Sulawesi Tengah 6,483,403 Pengembangan Kawasan Permukiman Sulawesi Selatan 8,826,762 Pengembangan Kawasan Permukiman Sulawesi Barat 4,719,784 Pengembangan Kawasan Permukiman Sulawesi Tenggara 7,909,727 Pengembangan Kawasan Permukiman Bali 6,238,511 Pengembangan Kawasan Permukiman Nusa Tenggara Barat 6,950,647 Pengembangan Kawasan Permukiman & Perbatasan Nusa Tenggara Timur 10,385,540 Pengembangan Kawasan Permukiman & Perbatasan Maluku 10,784,110 Pengembangan Kawasan Permukiman & Perbatasan Maluku Utara 9,310,164 Pengembangan Kawasan Permukiman & Perbatasan Papua 9,499,508 Pengembangan Kawasan Permukiman & Perbatasan Papua Barat 7,327,426
-
159,910,058 17,186,303 6,809,303 8,837,512 17,917,763 15,069,984 5,653,611 6,483,403 8,826,762 4,719,784 7,909,727 6,238,511 6,950,647 10,385,540 10,784,110 9,310,164 9,499,508 7,327,426
21,134,977 1,238,192 787,940 787,687 1,652,800 1,435,611 902,910 2,847,453 989,367 775,410 1,229,303 836,348 883,517 1,507,120 1,335,644 1,311,590 1,369,093 1,244,992
138,775,081 15,948,111 6,021,363 8,049,825 16,264,963 13,634,373 4,750,701 3,635,950 7,837,395 3,944,374 6,680,424 5,402,163 6,067,130 8,878,420 9,448,466 7,998,574 8,130,415 6,082,434
-
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
77,800,000
1,005,833,940
73,231,913
854,802,027
TOTAL
928,033,940
67,800,000
67,800,000
67,800,000
PAGU TERKONTRAK TOTAL 627,661,988 28,158,000 18,293,488 508,510,500 72,700,000 294,940,039 156,164,958 7,657,555 10,460,925 4,893,394 8,391,700 14,055,128 3,963,279 4,465,745 7,488,491 4,242,433 6,134,685 6,218,665 8,727,484 26,734,196 31,900,513 10,830,765 138,775,081 15,948,111 6,021,363 8,049,825 16,264,963 13,634,373 4,750,701 3,635,950 7,837,395 3,944,374 6,680,424 5,402,163 6,067,130 8,878,420 9,448,466 7,998,574 8,130,415 6,082,434 922,602,027
BLM
RPM -
10,000,000 10,000,000 10,000,000 -
545,767,988 14,005,000 18,293,488 508,569,500 4,900,000
NILAI KONTRAK
PHLN
TOTAL
67,800,000
613,567,988 14,005,000 18,293,488 508,569,500 72,700,000
506,511,226 12,659,478 16,598,737 472,758,413 4,494,598
67,800,000
RPM
SISA PAGU KONTRAK
PHLN
TOTAL
RPM
67,800,000
574,311,226 12,659,478 16,598,737 472,758,413 72,294,598
39,256,762 1,345,522 1,694,751 35,811,087 405,402
-
39,256,762 1,345,522 1,694,751 35,811,087 405,402
67,800,000
PHLN
TOTAL
-
296,580,169 155,805,098 7,657,555 10,460,925 4,893,394 8,341,700 14,055,128 3,653,429 4,465,745 7,488,491 4,242,423 6,134,685 6,218,665 8,727,484 26,734,196 31,900,513 10,830,765
262,857,188 137,834,257 6,234,387 9,905,650 3,796,461 6,637,495 12,775,122 3,618,530 4,431,258 7,047,800 3,455,224 6,033,787 6,192,535 6,874,969 23,765,276 29,606,043 7,459,720
-
-
296,580,169 155,805,098 7,657,555 10,460,925 4,893,394 8,341,700 14,055,128 3,653,429 4,465,745 7,488,491 4,242,423 6,134,685 6,218,665 8,727,484 26,734,196 31,900,513 10,830,765
262,857,188 137,834,257 6,234,387 9,905,650 3,796,461 6,637,495 12,775,122 3,618,530 4,431,258 7,047,800 3,455,224 6,033,787 6,192,535 6,874,969 23,765,276 29,606,043 7,459,720
33,722,981 17,970,841 1,423,168 555,275 1,096,933 1,704,205 1,280,006 34,899 34,487 440,691 787,199 100,898 26,130 1,852,515 2,968,920 2,294,470 3,371,045
-
33,722,981 17,970,841 1,423,168 555,275 1,096,933 1,704,205 1,280,006 34,899 34,487 440,691 787,199 100,898 26,130 1,852,515 2,968,920 2,294,470 3,371,045
140,775,071 15,948,111 6,021,363 8,049,825 16,264,953 13,634,373 4,750,701 5,635,950 7,837,395 3,944,374 6,680,424 5,402,163 6,067,130 8,878,420 9,448,466 7,998,574 8,130,415 6,082,434
-
140,775,071 15,948,111 6,021,363 8,049,825 16,264,953 13,634,373 4,750,701 5,635,950 7,837,395 3,944,374 6,680,424 5,402,163 6,067,130 8,878,420 9,448,466 7,998,574 8,130,415 6,082,434
125,022,931 15,367,530 5,929,220 7,551,346 12,385,282 11,401,334 4,126,376 4,956,409 6,215,394 2,939,594 6,601,007 4,593,051 4,473,045 7,701,642 8,944,775 7,890,525 7,907,982 6,038,419
-
-
125,022,931 15,367,530 5,929,220 7,551,346 12,385,282 11,401,334 4,126,376 4,956,409 6,215,394 2,939,594 6,601,007 4,593,051 4,473,045 7,701,642 8,944,775 7,890,525 7,907,982 6,038,419
15,752,140 580,581 92,143 498,479 3,879,671 2,233,039 624,325 679,541 1,622,001 1,004,780 79,417 809,112 1,594,085 1,176,778 503,691 108,049 222,433 44,015
-
15,752,140 580,581 92,143 498,479 3,879,671 2,233,039 624,325 679,541 1,622,001 1,004,780 79,417 809,112 1,594,085 1,176,778 503,691 108,049 222,433 44,015
10,000,000
842,348,157
910,148,157
769,368,414
837,168,414
72,979,743
-
72,979,743
-
67,800,000
67,800,000
RENCANA PENYERAPAN DAN PROGRES KEUANGAN DIREKTORAT PENGEMBANGAN PERMUKIMAN STATUS: 18 AGUSTUS 2009 ( X Rp. 1000 )
NO
KODE SATKER
PAGU NAMA SATUAN KERJA RUPIAH MURNI
PLN
TOTAL
RENCANA PENYERAPAN TARGET PENYERAPAN MINGGU KE-2 BULAN MINGGU KE-2 BULAN AGUSTUS AGUSTUS FISIK FISIK KEUANGAN (RP) KEUANGAN (RP) (%) (%)
DEVIASI
REALISASI RUPIAH MURNI
PHLN
TOTAL
KEU.
FISIK
%
%
KEUANGAN (RP)
%
452771 488822 493181 487760
Satker Pusat Pengembangan Permukiman Penyediaan PS Agropolitan Pelaksanaan Pengembangan Permukiman (Rusunawa) Pembinaan Teknis Penataan Lingkungan Permukiman (NUSSP)
595,073,783 49,604,647 22,301,130 514,730,296 8,437,710
67,800,000 67,800,000
662,873,783 49,604,647 22,301,130 514,730,296 76,237,710
546,410,211 18,600,000 9,554,074 476,606,137 41,650,000
88.74 75.71 50.92 94.98 66.11
491,030,023 18,600,000 8,075,673 422,704,350 41,650,000
82.21 75.71 47.43 86.72 66.11
334,266,618 15,075,004 5,554,006 309,952,514 3,685,094
28,505,127 28,505,127
362,771,745 15,075,004 5,554,006 309,952,514 32,190,221
54.73 30.39 24.90 60.22 42.22
64.13 33.40 26.89 71.81 43.15
(128,258,277) -3,524,996 -2,521,667 -112,751,835 -9,459,779
-19.35 -7.11 -11.31 -21.91 -12.41
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
486479 486485 486491 486505 493336 486511 486686 486520 487723 486536 487732 486432 486448 486454 486460
SATKER PROPINSI 332,960,157 Wilayah 1 173,050,099 Pengembangan Kawasan Permukiman & Perbatasan Nanggroe Aceh Darussalam 10,034,684 Pengembangan Kawasan Permukiman & Perbatasan Sumatera Utara 11,590,064 Pengembangan Kawasan Permukiman Sumatera Barat 5,825,630 Pengembangan Kawasan Permukiman & Perbatasan Riau 9,921,051 Pengembangan Kawasan Permukiman & Perbatasan Kepulauan Riau 15,637,078 Pengembangan Kawasan Permukiman Jambi 4,741,532 Pengembangan Kawasan Permukiman Bengkulu 5,419,990 Pengembangan Kawasan Permukiman Sumatera Selatan 8,537,298 Pengembangan Kawasan Permukiman Bangka Belitung 4,937,372 Pengembangan Kawasan Permukiman Lampung 6,993,206 Pengembangan Kawasan Permukiman Banten 7,082,360 Pengembangan Kawasan Permukiman Jawa Barat 9,525,872 Pengembangan Kawasan Permukiman Jawa Tengah 28,137,654 Pengembangan Kawasan Permukiman D.I.Yogyakarta 32,942,140 Pengembangan Kawasan Permukiman Jawa Timur 11,724,168
10,000,000 10,000,000 10,000,000 -
342,960,157 183,050,099 20,034,684 11,590,064 5,825,630 9,921,051 15,637,078 4,741,532 5,419,990 8,537,298 4,937,372 6,993,206 7,082,360 9,525,872 28,137,654 32,942,140 11,724,168
224,556,624 114,626,380 10,175,094 7,930,000 4,450,000 4,984,832 10,225,000 3,125,000 4,185,000 5,742,066 4,035,000 5,565,000 5,890,000 7,528,295 14,138,811 20,750,000 5,902,282
75.80 72.68 53.15 75.58 81.71 59.51 75.59 73.60 83.21 73.47 87.29 84.80 86.84 88.50 78.42 69.82 59.71
198,001,929 104,616,196 9,450,000 5,880,000 2,590,000 6,000,000 8,155,000 3,351,471 3,866,530 4,425,000 3,100,000 4,973,123 5,830,073 4,570,000 13,600,000 23,100,000 5,725,000
66.45 65.60 53.41 64.11 49.44 68.14 65.49 79.25 79.76 65.24 68.46 79.95 87.27 53.54 56.51 76.80 59.36
177,826,634 88,744,975 2,548,803 6,730,784 1,803,142 5,736,412 6,247,567 3,290,808 4,604,578 3,871,494 4,284,449 5,552,955 5,784,991 3,930,127 11,020,867 19,596,795 3,741,203
5,927,744 5,927,744 5,927,744 -
183,754,378 94,672,719 8,476,547 6,730,784 1,803,142 5,736,412 6,247,567 3,290,808 4,604,578 3,871,494 4,284,449 5,552,955 5,784,991 3,930,127 11,020,867 19,596,795 3,741,203
53.58 51.72 42.31 58.07 30.95 57.82 39.95 69.40 84.96 45.35 86.78 79.41 81.68 41.26 39.17 59.49 31.91
70.62 65.63 51.39 75.91 59.77 77.46 64.93 78.42 94.13 66.13 74.08 89.19 86.17 81.56 51.36 58.34 66.76
(14,247,551) (9,943,477) -973,453 850,784 -786,858 -263,588 -1,907,433 -60,663 738,049 -553,506 1,184,449 579,833 -45,082 -639,873 -2,579,133 -3,503,205 -1,983,797
-4.15 -5.43 -4.86 7.34 -13.51 -2.66 -12.20 -1.28 13.62 -6.48 23.99 8.29 -0.64 -6.72 -9.17 -10.63 -16.92
486542 486551 486567 486573 486582 487748 486598 486602 452796 486618 486649 486655 486661 486624 486630 486670 493769
Wilayah 2 Pengembangan Kawasan Permukiman & Perbatasan Kalimantan Barat Pengembangan Kawasan Permukiman Kalimantan Tengah Pengembangan Kawasan Permukiman Kalimantan Selatan Pengembangan Kawasan Permukiman & Perbatasan Kalimantan Timur Pengembangan Kawasan Permukiman & Perbatasan Sulawesi Utara Pengembangan Kawasan Permukiman Gorontalo Pengembangan Kawasan Permukiman Sulawesi Tengah Pengembangan Kawasan Permukiman Sulawesi Selatan Pengembangan Kawasan Permukiman Sulawesi Barat Pengembangan Kawasan Permukiman Sulawesi Tenggara Pengembangan Kawasan Permukiman Bali Pengembangan Kawasan Permukiman Nusa Tenggara Barat Pengembangan Kawasan Permukiman & Perbatasan Nusa Tenggara Timur Pengembangan Kawasan Permukiman & Perbatasan Maluku Pengembangan Kawasan Permukiman & Perbatasan Maluku Utara Pengembangan Kawasan Permukiman & Perbatasan Papua Pengembangan Kawasan Permukiman & Perbatasan Papua Barat
159,910,058 17,186,303 6,809,303 8,837,512 17,917,763 15,069,984 5,653,611 6,483,403 8,826,762 4,719,784 7,909,727 6,238,511 6,950,647 10,385,540 10,784,110 9,310,164 9,499,508 7,327,426
-
159,910,058 17,186,303 6,809,303 8,837,512 17,917,763 15,069,984 5,653,611 6,483,403 8,826,762 4,719,784 7,909,727 6,238,511 6,950,647 10,385,540 10,784,110 9,310,164 9,499,508 7,327,426
109,930,244 9,990,980 5,703,941 6,082,300 10,861,352 10,531,630 3,944,495 4,847,243 7,072,382 2,371,455 6,743,145 4,831,916 6,205,000 5,218,215 8,600,000 7,610,000 4,626,449 4,689,741
79.37 66.31 93.34 75.29 63.74 96.82 94.14 96.09 98.44 59.51 95.83 84.31 93.95 59.51 84.29 86.14 56.42 74.11
93,385,733 8,163,280 4,738,560 4,099,110 10,570,411 9,218,960 3,604,470 3,963,650 5,560,168 2,368,252 5,103,873 3,923,820 4,505,486 4,991,649 6,700,122 5,787,500 5,689,683 4,396,740
67.42 59.21 77.71 51.74 66.38 71.11 71.38 71.07 73.05 58.07 75.21 72.87 75.84 56.67 71.56 72.23 64.55 69.71
89,081,658 6,180,260 5,607,806 5,184,199 10,373,086 8,227,468 3,743,037 4,029,526 5,124,412 1,682,169 4,770,647 4,613,407 3,604,029 4,656,250 5,650,509 5,159,042 5,560,981 4,914,831
-
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
89,081,658 6,180,260 5,607,806 5,184,199 10,373,086 8,227,468 3,743,037 4,029,526 5,124,412 1,682,169 4,770,647 4,613,407 3,604,029 4,656,250 5,650,509 5,159,042 5,560,981 4,914,831
55.71 35.96 82.36 58.66 57.89 54.60 66.21 62.15 58.06 35.64 60.31 73.95 51.85 44.83 52.40 55.41 58.54 67.07
76.33 49.46 90.44 86.89 76.45 74.60 84.07 77.92 94.10 81.74 74.53 88.82 90.72 68.55 85.10 64.42 76.78 74.88
(4,304,075) -1,983,021 869,246 1,085,090 -197,325 -991,492 138,568 65,876 -435,756 -686,083 -333,226 689,587 -901,457 -335,399 -1,049,613 -628,458 -128,702 518,091
-2.69 -11.54 12.77 12.28 -1.10 -6.58 2.45 1.02 -4.94 -14.54 -4.21 11.05 -12.97 -3.23 -9.73 -6.75 -1.35 7.07
928,033,940
77,800,000
1,005,833,940
770,966,835
84.33
689,031,951
76.83
512,093,252
34,432,871
546,526,123
54.34
66.34
(142,505,829)
-14.17
1 2 3 4
TOTAL
-
RENCANA DAN REALISASI PENYERAPAN DIREKTORAT PENGEMBANGAN PERMUKIMAN TAHUN ANGGARAN 2009 1,200,000 1,005,834 943,599
1,000,000
982,278
1,005,834
890,801 DALAM JUTAAN RUPIAH
820,900 800,000
721,034 624,221
PAGU RENCANA REALISASI TARGET
600,000 546,526 517,167 427,728 403,753 327,006
461,263 356,171
400,000 210,330
252,038 214,649
200,000 64,303 12,274
0 -
0
0 0 JAN
84,179 152,023
54,57959,360 65,637 0 FEB MAR
APR
MEI
JUN
JUL
AGT
SEP
OKT
NOP
DES
BULAN
TARGET PENYERAPAN 6 BULAN KEDEPAN KEGIATAN PELAKSANAAN DITJEN CIPTA KARYA TA 2009 Direktorat BANGKIM
PELAKSANAAN
(x Rp. 1000)
TOTAL PAGU
JUNI
JULI
AGUSTUS
BULAN SEPTEMBER
OKTOBER
NOPEMBER
DESEMBER
1,005,833,940 FISIK % KEUANGAN (KOMULATIF) KEUANGAN (ABSOLUTE)
42.40 412,121,172 412,121,172
63.35 621,400,061 209,278,889
76.83 756,663,842 135,263,780
88.40 873,308,513 116,644,671
93.84 933,357,265 60,048,752
97.02 973,243,226 39,885,961
100.00 1,005,833,940 32,590,714
PENJELASAN KETERLAMBATAN PROGRESS PENYERAPAN DANA DIREKTORAT PENGEMBANGAN PERMUKIMAN STATUS 18 AGUSTUS 2009
NO
SATKER 1 Agropolitan
PROGRESS KEUANGAN 24.90%
ALASAN KETERLAMBATAN Satker-satker yang mendapatkan SKPA masih dalam penyiapan administrasi untuk pengajuan termin.
TINDAK LANJUT Memerintahkan kepada kontraktor agar segera menyiapkan kelengkapan administrasi pengajuan termin.
PERMASALAHAN DAN TINDAK LANJUT PROGRES KEGIATAN MA 999 TA 2009 DIREKTORAT PENGEMBANGAN PERMUKIMAN STATUS 18 AGUSTUS 2009
NO
SATKER 1 NUSSP Kota Surabaya
ALASAN KETERLAMBATAN Kota Surabaya tidak menyediakan dana APBD sehingga dana yang sudah teralokasi dalam DIPA tidak akan dilaksanakan.
TINDAK LANJUT
PROGRES PELAKSANAAN KEGIATAN DITJEN CIPTA KARYA Direktorat Penataan Bangunan dan Lingkungan A.
Saat ini progres pelaksanaan kegiatan yang telah dicapai yakni :
Direktorat Penataan Bangunan & Lingkungan (x 1.000)
Progres Fisik (%) Keuangan (Rp) Keuangan (%)
Rencana penyerapan Minggu Target Penyerapan Minggu Ke-2 Bulan Agustus Ke-2 Bulan Agustus 72.67 824,714,485 56.92
58.44 668,452,093 46.14
Realisasi 41.75 499,510,956 34.48
Deviasi -16.70 (168,941,137) -11.66
LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2009 DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN STATUS: 18 AGUSTUS 2009 PAGU
PAGU (Rp) SWAKELOLA + KONTRAKTUAL AP
NO
KODE SATKER
1 2 3 4 5
452780 483690 493217 505137 449582
Satker Pusat Direktorat Penataan Bangunan & Lingkungan Penataan & Revitalisasi Kawasan Penanggulangan Kemiskinan di Perkotaan (P2KP-PNPM) Rehabilitasi dan Pembangunan Gedung Negara Rehab./Rekonstruksi Rumah Pasca Gempa Bumi DIY & Jateng
130,065,993 28,556,682 39,032,866 13,844,800 43,850,000 4,781,645
189,018,000 177,112,000 11,906,000
319,083,993 28,556,682 39,032,866 190,956,800 43,850,000 16,687,645
41,639,048 18,331,932 3,820,212 13,744,800 2,308,384 3,433,720
277,444,945 10,224,750 35,212,654 177,212,000 41,541,616 13,253,925
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
493342 493351 493367 493373 493382 493398 493424 493482 493418 493430 493552 493543 493568 493574 493580 493599
Satker Propinsi Penataan Bangunan dan Lingkungan Wilayah I Penataan Bangunan & Lingkungan NAD Penataan Bangunan & Lingkungan Sumatera Utara Penataan Bangunan & Lingkungan Sumatera Barat Penataan Bangunan & Lingkungan Riau Penataan Bangunan & Lingkungan Kepulauan Riau Penataan Bangunan & Lingkungan Jambi Penataan Bangunan & Lingkungan Bengkulu Penataan Bangunan & Lingkungan Sumatera Selatan Penataan Bangunan & Lingkungan Bangka Belitung Penataan Bangunan & Lingkungan Lampung Penataan Bangunan & Lingkungan Banten Penataan Bangunan & Lingkungan DKI Jakarta Penataan Bangunan & Lingkungan Jawa Barat Penataan Bangunan & Lingkungan Jawa Tengah Penataan Bangunan & Lingkungan D.I.Yogyakarta Penataan Bangunan & Lingkungan Jawa Timur
252,369,592 11,955,802 23,409,531 14,242,104 19,045,490 11,089,076 14,312,940 14,643,285 12,369,350 17,630,064 12,760,862 15,601,966 4,269,009 22,385,173 24,042,518 12,197,746 22,414,676
451,693,090 28,713,810 32,901,990 26,803,820 3,923,840 3,542,830 5,538,620 12,383,780 13,693,690 6,182,460 10,409,540 28,761,500 8,611,170 76,620,510 96,018,880 19,176,980 78,409,670
704,062,682 40,669,612 56,311,521 41,045,924 22,969,330 14,631,906 19,851,560 27,027,065 26,063,040 23,812,524 23,170,402 44,363,466 12,880,179 99,005,683 120,061,398 31,374,726 100,824,346
36,918,113 2,596,160 3,057,710 2,545,377 2,066,700 2,013,637 1,942,347 1,799,812 2,256,498 2,078,422 1,912,122 2,314,546 1,650,313 2,714,691 2,900,567 2,147,444 2,921,767
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
493600 493625 493619 493631 493775 493781 493790 493801 452800 493810 493826 493832 493841 493857 493863 493872 493888
Penataan Bangunan dan Lingkungan Wilayah II Penataan Bangunan & Lingkungan Kalimantan Barat Penataan Bangunan & Lingkungan Kalimantan Tengah Penataan Bangunan & Lingkungan Kalimantan Selatan Penataan Bangunan & Lingkungan Kalimantan Timur Penataan Bangunan & Lingkungan Sulawesi Utara Penataan Bangunan & Lingkungan Gorontalo Penataan Bangunan & Lingkungan Sulawesi Tengah Penataan Bangunan & Lingkungan Sulawesi Selatan Penataan Bangunan & Lingkungan Sulawesi Barat Penataan Bangunan & Lingkungan Sulawesi Tenggara Penataan Bangunan & Lingkungan Bali Penataan Bangunan & Lingkungan NTB Penataan Bangunan & Lingkungan NTT Penataan Bangunan & Lingkungan Maluku Penataan Bangunan & Lingkungan Maluku Utara Penataan Bangunan & Lingkungan Papua Penataan Bangunan & Lingkungan Papua Barat
257,994,368 16,385,230 15,062,049 19,172,782 18,217,328 12,313,474 14,479,201 12,553,265 19,983,894 10,755,108 16,804,681 13,524,707 15,636,676 15,153,489 12,467,579 12,711,409 18,312,762 14,460,734
167,713,545 12,691,800 3,019,000 19,746,150 11,052,970 12,613,780 5,479,350 4,168,470 24,979,110 2,710,600 20,922,955 4,300,400 21,831,040 8,199,380 4,698,550 5,613,260 3,141,310 2,545,420
425,707,913 29,077,030 18,081,049 38,918,932 29,270,298 24,927,254 19,958,551 16,721,735 44,963,004 13,465,708 37,727,636 17,825,107 37,467,716 23,352,869 17,166,129 18,324,669 21,454,072 17,006,154
640,429,953
808,424,635
1,448,854,588
NAMA SATUAN KERJA
TOTAL
1 2 3 4 5 6 7 8 9 10
Keterangan : Penyiapan Dokumen Lelang Pengumuman Lelang/Prakualifikasi Penyusunan shortlist Undangan Pelelangan Penjelasan Pekerjaan Aanwyzing Pemasukan Penawaran Usulan Pemenang Penetapan Pemenang Penerbitan Surat Perintah Mulai Kerja Penandatangan Kontrak
RUPIAH MURNI
PLN
TOTAL
PAKET KONTRAK NON FISIK TOTAL FISIK
BLM -
115 16 3 64 25 7
215,451,479 9,359,642 20,351,821 11,696,727 16,978,790 9,075,439 12,370,593 12,843,473 10,112,852 15,551,642 10,848,740 13,287,420 2,618,696 19,670,482 21,141,951 10,050,302 19,492,909
451,693,090 28,713,810 32,901,990 26,803,820 3,923,840 3,542,830 5,538,620 12,383,780 13,693,690 6,182,460 10,409,540 28,761,500 8,611,170 76,620,510 96,018,880 19,176,980 78,409,670
38,818,248 2,307,929 2,123,371 2,286,808 2,349,284 2,255,759 1,936,408 2,061,456 2,785,493 1,854,462 2,432,562 2,009,381 2,098,254 2,591,461 2,363,775 2,091,288 2,831,476 2,439,081
219,176,120 14,077,301 12,938,678 16,885,974 15,868,044 10,057,715 12,542,793 10,491,809 17,198,401 8,900,646 14,372,119 11,515,326 13,538,422 12,562,028 10,103,804 10,620,121 15,481,286 12,021,653
117,375,409
712,072,544
23 4 2
JUMLAH PAKET DALAM PROSES PRA KONTRAK 1
14 3
138 20 5 64 39 10
-
265 15 19 15 12 18 13 15 13 23 12 19 7 18 24 13 29
260 16 38 11 18 9 9 20 8 9 9 39 4 11 27 13 19
525 31 57 26 30 27 22 35 21 32 21 58 11 29 51 26 48
-
167,713,545 12,691,800 3,019,000 19,746,150 11,052,970 12,613,780 5,479,350 4,168,470 24,979,110 2,710,600 20,922,955 4,300,400 21,831,040 8,199,380 4,698,550 5,613,260 3,141,310 2,545,420
294 20 15 25 16 12 13 15 16 9 22 19 27 21 11 11 23 19
269 11 11 20 11 16 16 34 39 11 25 11 10 9 9 17 11 8
563 31 26 45 27 28 29 49 55 20 47 30 37 30 20 28 34 27
619,406,635
674
552
1,226
-
2
-
-
-
2
2 1
1 1
-
2
-
-
5 1 -
4 -
6
6
3
12 2
8 1 1 -
-
-
6 -
13
118 20 5 57 27 9
256,272,269 9,250,682 34,790,092 164,682,105 34,566,295 12,983,095
505 29 57 26 30 27 22 35 12 32 21 58 10 21 51 26 48
177,759,080 7,290,135 19,366,336 9,747,863 14,821,158 8,044,329 11,959,724 12,400,712 7,556,910 13,951,876 10,687,993 13,182,112 1,932,602 4,837,155 17,869,371 7,411,063 16,699,741
540 31 26 43 27 28 29 47 44 15 47 28 37 30 20 27 34 27
196,235,459 13,608,714 12,735,297 15,548,647 14,289,475 9,441,917 11,487,837 7,866,968 11,965,414 6,454,823 14,294,965 9,032,477 11,066,512 11,083,542 9,898,216 10,454,280 15,145,120 11,861,255
3 9 1 6 1 5 3
-
7 2 2 -
3 9
10
-
6
1 2 -
3
NILAI KONTRAK (Rp. x 1.000)
9
-
-
-
16
-
-
-
8
3 -
-
-
7
4 -
-
-
6
-
-
-
5
-
-
-
4
-
-
-
3
26
1,163
630,266,807
LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2009 DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN STATUS: 18 AGUSTUS 2009 ( x Rp. 1.000 ) NO
KODE SATKER
PAGU NAMA SATUAN KERJA
RUPIAH MURNI
PLN
TOTAL
SWAKELOLA + AP
RPM
1 2 3 4 5
452780 483690 493217 505137 449582
Satker Pusat Direktorat Penataan Bangunan & Lingkungan Penataan & Revitalisasi Kawasan Penanggulangan Kemiskinan di Perkotaan (P2KP-PNPM) Rehabilitasi dan Pembangunan Gedung Negara Rehab./Rekonstruksi Rumah Pasca Gempa Bumi DIY & Jateng
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
493342 493351 493367 493373 493382 493398 493424 493482 493418 493430 493552 493543 493568 493574 493580 493599
Satker Propinsi Penataan Bangunan dan Lingkungan Wilayah I Penataan Bangunan & Lingkungan NAD Penataan Bangunan & Lingkungan Sumatera Utara Penataan Bangunan & Lingkungan Sumatera Barat Penataan Bangunan & Lingkungan Riau Penataan Bangunan & Lingkungan Kepulauan Riau Penataan Bangunan & Lingkungan Jambi Penataan Bangunan & Lingkungan Bengkulu Penataan Bangunan & Lingkungan Sumatera Selatan Penataan Bangunan & Lingkungan Bangka Belitung Penataan Bangunan & Lingkungan Lampung Penataan Bangunan & Lingkungan Banten Penataan Bangunan & Lingkungan DKI Jakarta Penataan Bangunan & Lingkungan Jawa Barat Penataan Bangunan & Lingkungan Jawa Tengah Penataan Bangunan & Lingkungan D.I.Yogyakarta Penataan Bangunan & Lingkungan Jawa Timur
252,369,592 11,955,802 23,409,531 14,242,104 19,045,490 11,089,076 14,312,940 14,643,285 12,369,350 17,630,064 12,760,862 15,601,966 4,269,009 22,385,173 24,042,518 12,197,746 22,414,676
451,693,090 28,713,810 32,901,990 26,803,820 3,923,840 3,542,830 5,538,620 12,383,780 13,693,690 6,182,460 10,409,540 28,761,500 8,611,170 76,620,510 96,018,880 19,176,980 78,409,670
704,062,682 40,669,612 56,311,521 41,045,924 22,969,330 14,631,906 19,851,560 27,027,065 26,063,040 23,812,524 23,170,402 44,363,466 12,880,179 99,005,683 120,061,398 31,374,726 100,824,346
36,918,113 2,596,160 3,057,710 2,545,377 2,066,700 2,013,637 1,942,347 1,799,812 2,256,498 2,078,422 1,912,122 2,314,546 1,650,313 2,714,691 2,900,567 2,147,444 2,921,767
215,451,479 9,359,642 20,351,821 11,696,727 16,978,790 9,075,439 12,370,593 12,843,473 10,112,852 15,551,642 10,848,740 13,287,420 2,618,696 19,670,482 21,141,951 10,050,302 19,492,909
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
493600 493625 493619 493631 493775 493781 493790 493801 452800 493810 493826 493832 493841 493857 493863 493872 493888
Penataan Bangunan dan Lingkungan Wilayah II Penataan Bangunan & Lingkungan Kalimantan Barat Penataan Bangunan & Lingkungan Kalimantan Tengah Penataan Bangunan & Lingkungan Kalimantan Selatan Penataan Bangunan & Lingkungan Kalimantan Timur Penataan Bangunan & Lingkungan Sulawesi Utara Penataan Bangunan & Lingkungan Gorontalo Penataan Bangunan & Lingkungan Sulawesi Tengah Penataan Bangunan & Lingkungan Sulawesi Selatan Penataan Bangunan & Lingkungan Sulawesi Barat Penataan Bangunan & Lingkungan Sulawesi Tenggara Penataan Bangunan & Lingkungan Bali Penataan Bangunan & Lingkungan NTB Penataan Bangunan & Lingkungan NTT Penataan Bangunan & Lingkungan Maluku Penataan Bangunan & Lingkungan Maluku Utara Penataan Bangunan & Lingkungan Papua Penataan Bangunan & Lingkungan Papua Barat
257,994,368 16,385,230 15,062,049 19,172,782 18,217,328 12,313,474 14,479,201 12,553,265 19,983,894 10,755,108 16,804,681 13,524,707 15,636,676 15,153,489 12,467,579 12,711,409 18,312,762 14,460,734
167,713,545 12,691,800 3,019,000 19,746,150 11,052,970 12,613,780 5,479,350 4,168,470 24,979,110 2,710,600 20,922,955 4,300,400 21,831,040 8,199,380 4,698,550 5,613,260 3,141,310 2,545,420
425,707,913 29,077,030 18,081,049 38,918,932 29,270,298 24,927,254 19,958,551 16,721,735 44,963,004 13,465,708 37,727,636 17,825,107 37,467,716 23,352,869 17,166,129 18,324,669 21,454,072 17,006,154
38,818,248 2,307,929 2,123,371 2,286,808 2,349,284 2,255,759 1,936,408 2,061,456 2,785,493 1,854,462 2,432,562 2,009,381 2,098,254 2,591,461 2,363,775 2,091,288 2,831,476 2,439,081
640,429,953
808,424,635
1,448,854,588
117,375,409
TOTAL
130,065,993 28,556,682 39,032,866 13,844,800 43,850,000 4,781,645
189,018,000 177,112,000 11,906,000
319,083,993 28,556,682 39,032,866 190,956,800 43,850,000 16,687,645
41,639,048 18,331,932 3,820,212 13,744,800 2,308,384 3,433,720
88,426,945 10,224,750 35,212,654 100,000 41,541,616 1,347,925
PAGU (Rp) KONTRAKTUAL PHLN 189,018,000 177,112,000 11,906,000 -
PAGU TERKONTRAK TOTAL 277,444,945 10,224,750 35,212,654 177,212,000 41,541,616 13,253,925
BLM
RPM -
84,876,974 10,224,750 35,212,654 2,146,572 35,994,273 1,298,725
PHLN
TOTAL
RPM
174,543,455 162,637,455 11,906,000
259,420,429 10,224,750 35,212,654 164,784,027 35,994,273 13,204,725
81,834,743 9,250,682 34,790,092 2,044,650 34,566,295 1,183,024
-
197,731,324 8,938,874 20,351,821 11,696,727 16,978,790 9,075,439 12,370,593 12,581,473 7,985,144 15,551,642 10,848,740 13,287,420 2,018,696 5,360,803 21,141,951 10,050,302 19,492,909
177,759,080 7,290,135 19,366,336 9,747,863 14,821,158 8,044,329 11,959,724 12,400,712 7,556,910 13,951,876 10,687,993 13,182,112 1,932,602 4,837,155 17,869,371 7,411,063 16,699,741
-
-
210,842,161 14,077,301 12,938,678 16,385,974 15,868,044 10,057,715 12,542,793 8,122,790 14,683,460 6,940,646 14,372,119 10,540,326 13,538,422 12,622,028 10,103,804 10,545,122 15,481,286 12,021,653
196,235,459 13,608,714 12,735,297 15,548,647 14,289,475 9,441,917 11,487,837 7,866,968 11,965,414 6,454,823 14,294,965 9,032,477 11,066,512 11,083,542 9,898,216 10,454,280 15,145,120 11,861,255
-
667,993,914
455,829,281
-
215,451,479 9,359,642 20,351,821 11,696,727 16,978,790 9,075,439 12,370,593 12,843,473 10,112,852 15,551,642 10,848,740 13,287,420 2,618,696 19,670,482 21,141,951 10,050,302 19,492,909
451,693,090 28,713,810 32,901,990 26,803,820 3,923,840 3,542,830 5,538,620 12,383,780 13,693,690 6,182,460 10,409,540 28,761,500 8,611,170 76,620,510 96,018,880 19,176,980 78,409,670
197,731,324 8,938,874 20,351,821 11,696,727 16,978,790 9,075,439 12,370,593 12,581,473 7,985,144 15,551,642 10,848,740 13,287,420 2,018,696 5,360,803 21,141,951 10,050,302 19,492,909
-
219,176,120 14,077,301 12,938,678 16,885,974 15,868,044 10,057,715 12,542,793 10,491,809 17,198,401 8,900,646 14,372,119 11,515,326 13,538,422 12,562,028 10,103,804 10,620,121 15,481,286 12,021,653
-
219,176,120 14,077,301 12,938,678 16,885,974 15,868,044 10,057,715 12,542,793 10,491,809 17,198,401 8,900,646 14,372,119 11,515,326 13,538,422 12,562,028 10,103,804 10,620,121 15,481,286 12,021,653
167,713,545 12,691,800 3,019,000 19,746,150 11,052,970 12,613,780 5,479,350 4,168,470 24,979,110 2,710,600 20,922,955 4,300,400 21,831,040 8,199,380 4,698,550 5,613,260 3,141,310 2,545,420
210,842,161 14,077,301 12,938,678 16,385,974 15,868,044 10,057,715 12,542,793 8,122,790 14,683,460 6,940,646 14,372,119 10,540,326 13,538,422 12,622,028 10,103,804 10,545,122 15,481,286 12,021,653
-
523,054,544
189,018,000
712,072,544
619,406,635
493,450,459
174,543,455
SISA PAGU KONTRAK
NILAI KONTRAK TOTAL
RPM
174,437,526 162,637,455 11,800,071
PHLN
256,272,269 9,250,682 34,790,092 164,682,105 34,566,295 12,983,095
3,042,231 974,068 422,562 101,922 1,427,978 115,701
PHLN 105,929 0 0 0 0 105,929
TOTAL 3,148,160 974,068 422,562 101,922 1,427,978 221,630
-
177,759,080 7,290,135 19,366,336 9,747,863 14,821,158 8,044,329 11,959,724 12,400,712 7,556,910 13,951,876 10,687,993 13,182,112 1,932,602 4,837,155 17,869,371 7,411,063 16,699,741
19,972,244 1,648,739 985,485 1,948,864 2,157,632 1,031,110 410,869 180,761 428,234 1,599,766 160,747 105,308 86,094 523,648 3,272,580 2,639,239 2,793,168
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
19,972,244 1,648,739 985,485 1,948,864 2,157,632 1,031,110 410,869 180,761 428,234 1,599,766 160,747 105,308 86,094 523,648 3,272,580 2,639,239 2,793,168
-
196,235,459 13,608,714 12,735,297 15,548,647 14,289,475 9,441,917 11,487,837 7,866,968 11,965,414 6,454,823 14,294,965 9,032,477 11,066,512 11,083,542 9,898,216 10,454,280 15,145,120 11,861,255
14,606,703 468,587 203,381 837,327 1,578,569 615,798 1,054,957 255,822 2,718,046 485,823 77,154 1,507,849 2,471,910 1,538,486 205,588 90,842 336,166 160,398
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
14,606,703 468,587 203,381 837,327 1,578,569 615,798 1,054,957 255,822 2,718,046 485,823 77,154 1,507,849 2,471,910 1,538,486 205,588 90,842 336,166 160,398
174,437,526
630,266,807
37,621,178
105,929
37,727,107
DAFTAR PAKET PEKERJAAN YANG BELUM DILELANGKAN DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN STATUS : 18 AGUSTUS 2009
NO
SATKER
1 PBL Propinsi Maluku Utara
TOTAL
PAKET DLM PERSIAPAN LELANG 1
1
PAKET PEKERJAAN
SUPERVISI PENATAAN DAN REVITALISASI KAWASAN JAILOLO
PAGU (Rp)
PENJELASAN BELUM DILELANGKAN
75,000 Sebenarnya pekerjaan Supervisi ini tidak ada karena pekerjaan fisiknya tidak ada, sekarang sedang proses revisi POK. 75,000
RENCANA PELELANGAN
RENCANA PENYERAPAN DAN PROGRES KEUANGAN DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN STATUS: 18 AGUSTUS 2009 ( X Rp. 1000 )
NO
KODE SATKER
PAGU NAMA SATUAN KERJA RUPIAH MURNI
PLN
TOTAL
RENCANA PENYERAPAN TARGET PENYERAPAN MINGGU KE-2 BULAN MINGGU KE-2 BULAN AGUSTUS AGUSTUS FISIK FISIK KEUANGAN (RP) KEUANGAN (RP) (%) (%)
REALISASI RUPIAH MURNI
PHLN
TOTAL
DEVIASI KEU.
FISIK
%
%
KEUANGAN (RP)
%
452780 483690 493217 505137 449582
Satker Pusat Direktorat Penataan Bangunan & Lingkungan Penataan & Revitalisasi Kawasan Penanggulangan Kemiskinan di Perkotaan (P2KP-PNPM) Rehabilitasi dan Pembangunan Gedung Negara Rehab./Rekonstruksi Rumah Pasca Gempa Bumi DIY & Jateng
130,065,993 28,556,682 39,032,866 13,844,800 43,850,000 4,781,645
189,018,000 177,112,000 11,906,000
319,083,993 28,556,682 39,032,866 190,956,800 43,850,000 16,687,645
214,709,923 19,154,656 21,075,275 144,428,400 23,676,223 6,375,369
71.49 73.00 73.00 73.00 73.00 44.20
130,437,218 15,613,898 27,122,106 59,578,522 21,280,758 6,841,935
53.25 60.78 74.00 42.80 77.79 47.00
49,511,889 7,929,122 26,498,830 3,960,206 10,038,365 1,085,366
61,742,486 55,315,168 6,427,318
111,254,375 7,929,122 26,498,830 59,275,374 10,038,365 7,512,684
34.87 27.77 67.89 31.04 22.89 45.02
37.38 31.30 80.71 30.66 26.60 51.72
(19,182,843) -7,684,776 -623,276 -303,148 -11,242,393 670,750
-6.01 -26.91 -1.60 -0.16 -25.64 4.02
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
493342 493351 493367 493373 493382 493398 493424 493482 493418 493430 493552 493543 493568 493574 493580 493599
Satker Propinsi Penataan Bangunan dan Lingkungan Wilayah I Penataan Bangunan & Lingkungan NAD Penataan Bangunan & Lingkungan Sumatera Utara Penataan Bangunan & Lingkungan Sumatera Barat Penataan Bangunan & Lingkungan Riau Penataan Bangunan & Lingkungan Kepulauan Riau Penataan Bangunan & Lingkungan Jambi Penataan Bangunan & Lingkungan Bengkulu Penataan Bangunan & Lingkungan Sumatera Selatan Penataan Bangunan & Lingkungan Bangka Belitung Penataan Bangunan & Lingkungan Lampung Penataan Bangunan & Lingkungan Banten Penataan Bangunan & Lingkungan DKI Jakarta Penataan Bangunan & Lingkungan Jawa Barat Penataan Bangunan & Lingkungan Jawa Tengah Penataan Bangunan & Lingkungan D.I.Yogyakarta Penataan Bangunan & Lingkungan Jawa Timur
252,369,592 11,955,802 23,409,531 14,242,104 19,045,490 11,089,076 14,312,940 14,643,285 12,369,350 17,630,064 12,760,862 15,601,966 4,269,009 22,385,173 24,042,518 12,197,746 22,414,676
451,693,090 28,713,810 32,901,990 26,803,820 3,923,840 3,542,830 5,538,620 12,383,780 13,693,690 6,182,460 10,409,540 28,761,500 8,611,170 76,620,510 96,018,880 19,176,980 78,409,670
704,062,682 40,669,612 56,311,521 41,045,924 22,969,330 14,631,906 19,851,560 27,027,065 26,063,040 23,812,524 23,170,402 44,363,466 12,880,179 99,005,683 120,061,398 31,374,726 100,824,346
380,149,253 21,959,014 30,404,655 22,162,199 12,401,983 7,900,302 10,718,585 14,592,903 14,072,391 12,857,255 12,510,549 23,953,462 6,954,481 53,456,798 64,825,550 16,940,365 54,438,761
73.00 73.00 73.00 73.00 73.00 73.00 73.00 73.00 73.00 73.00 73.00 73.00 73.00 73.00 73.00 73.00 73.00
337,820,019 17,315,087 30,404,655 22,162,200 12,401,983 6,840,043 10,620,585 12,297,315 14,072,738 12,857,572 12,510,549 16,839,705 6,954,481 53,456,798 51,137,301 16,157,984 41,791,024
61.73 48.95 73.00 73.00 73.00 58.56 75.50 52.00 73.00 66.00 73.00 47.56 73.00 73.00 47.80 69.00 55.34
91,612,006 2,592,857 14,056,858 3,789,314 8,564,770 4,963,689 7,404,075 6,500,608 2,785,860 7,642,451 5,842,386 4,591,663 1,437,050 2,326,482 6,061,128 4,432,216 8,620,599
142,801,645 17,717,190 11,828,008 6,470,669 1,598,950 1,335,900 1,101,550 1,722,300 4,386,256 1,399,600 2,561,200 5,562,769 3,856,880 19,611,529 32,430,427 6,420,200 24,798,217
234,413,651 20,310,047 25,884,866 10,259,983 10,163,720 6,299,589 8,505,625 8,222,908 7,172,116 9,042,051 8,403,586 10,154,432 5,293,930 21,938,011 38,491,555 10,852,416 33,418,816
33.29 49.94 45.97 25.00 44.25 43.05 42.85 30.42 27.52 37.97 36.27 22.89 41.10 22.16 32.06 34.59 33.15
40.90 52.11 53.93 58.37 56.37 53.05 54.20 44.64 42.39 53.90 45.59 28.58 40.82 24.18 33.85 47.21 36.86
(103,406,368) 2,994,960 -4,519,789 -11,902,217 -2,238,263 -540,454 -2,114,960 -4,074,407 -6,900,622 -3,815,521 -4,106,963 -6,685,273 -1,660,551 -31,518,787 -12,645,746 -5,305,568 -8,372,208
-14.69 7.36 -8.03 -29.00 -9.74 -3.69 -10.65 -15.08 -26.48 -16.02 -17.73 -15.07 -12.89 -31.84 -10.53 -16.91 -8.30
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
493600 493625 493619 493631 493775 493781 493790 493801 452800 493810 493826 493832 493841 493857 493863 493872 493888
Penataan Bangunan dan Lingkungan Wilayah II Penataan Bangunan & Lingkungan Kalimantan Barat Penataan Bangunan & Lingkungan Kalimantan Tengah Penataan Bangunan & Lingkungan Kalimantan Selatan Penataan Bangunan & Lingkungan Kalimantan Timur Penataan Bangunan & Lingkungan Sulawesi Utara Penataan Bangunan & Lingkungan Gorontalo Penataan Bangunan & Lingkungan Sulawesi Tengah Penataan Bangunan & Lingkungan Sulawesi Selatan Penataan Bangunan & Lingkungan Sulawesi Barat Penataan Bangunan & Lingkungan Sulawesi Tenggara Penataan Bangunan & Lingkungan Bali Penataan Bangunan & Lingkungan NTB Penataan Bangunan & Lingkungan NTT Penataan Bangunan & Lingkungan Maluku Penataan Bangunan & Lingkungan Maluku Utara Penataan Bangunan & Lingkungan Papua Penataan Bangunan & Lingkungan Papua Barat
257,994,368 16,385,230 15,062,049 19,172,782 18,217,328 12,313,474 14,479,201 12,553,265 19,983,894 10,755,108 16,804,681 13,524,707 15,636,676 15,153,489 12,467,579 12,711,409 18,312,762 14,460,734
167,713,545 12,691,800 3,019,000 19,746,150 11,052,970 12,613,780 5,479,350 4,168,470 24,979,110 2,710,600 20,922,955 4,300,400 21,831,040 8,199,380 4,698,550 5,613,260 3,141,310 2,545,420
425,707,913 29,077,030 18,081,049 38,918,932 29,270,298 24,927,254 19,958,551 16,721,735 44,963,004 13,465,708 37,727,636 17,825,107 37,467,716 23,352,869 17,166,129 18,324,669 21,454,072 17,006,154
229,855,309 15,699,754 9,762,621 21,013,758 15,804,107 13,459,138 10,776,353 9,028,678 24,277,174 7,270,629 20,370,534 9,624,429 20,230,193 12,609,070 9,268,622 9,894,161 11,583,840 9,182,246
73.00 73.00 73.00 73.00 73.00 73.00 73.00 73.00 73.00 73.00 73.00 73.00 73.00 73.00 73.00 73.00 73.00 73.00
200,194,855 11,706,883 9,762,621 22,189,921 15,804,107 8,553,787 10,776,353 8,317,833 22,031,872 7,100,468 11,884,205 8,523,075 18,533,206 9,971,675 10,038,752 7,713,424 10,162,794 7,123,878
56.90 45.00 73.00 64.16 73.00 34.66 73.00 53.60 56.41 59.04 55.00 53.61 57.89 47.81 71.53 48.74 52.37 50.14
110,852,649 5,507,689 8,029,813 8,620,155 4,485,664 5,842,650 7,801,720 4,534,148 6,819,914 2,984,061 5,839,720 4,697,889 5,017,957 4,257,287 7,854,947 6,429,227 10,480,758 11,649,050
42,990,281 1,548,374 638,312 5,348,643 1,952,810 3,594,872 1,402,135 1,178,088 10,496,861 1,543,274 2,220,518 1,317,000 4,664,602 1,597,515 1,052,730 2,880,447 897,800 656,300
153,842,930 7,056,063 8,668,125 13,968,798 6,438,474 9,437,522 9,203,855 5,712,236 17,316,775 4,527,335 8,060,238 6,014,889 9,682,559 5,854,802 8,907,677 9,309,674 11,378,558 12,305,350
36.14 24.27 47.94 35.89 22.00 37.86 46.11 34.16 38.51 33.62 21.36 33.74 25.84 25.07 51.89 50.80 53.04 72.36
46.42 35.71 64.12 63.20 25.35 40.60 49.60 36.31 47.90 35.29 30.80 58.59 27.61 36.14 63.75 56.73 74.62 76.64
(46,351,925) -4,650,820 -1,094,496 -8,221,123 -9,365,633 883,735 -1,572,498 -2,605,597 -4,715,097 -2,573,133 -3,823,967 -2,508,186 -8,850,647 -4,116,873 -1,131,075 1,596,250 1,215,764 5,181,472
-10.89 -15.99 -6.05 -21.12 -32.00 3.55 -7.88 -15.58 -10.49 -19.11 -10.14 -14.07 -23.62 -17.63 -6.59 8.71 5.67 30.47
640,429,953
808,424,635
1,448,854,588
824,714,485
72.67
668,452,093
58.44
251,976,544
247,534,412
499,510,956
34.48
41.75
(168,941,137)
-11.66
1 2 3 4 5
TOTAL
RENCANA DAN REALISASI PENYERAPAN DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN TAHUN ANGGARAN 2009 1,600,000 1,448,855
1,400,812
1,448,855
1,400,000 1,223,473
DALAM JUTAAN RUPIAH
1,200,000
1,067,674
1,000,000
905,990 PAGU RENCANA
743,439
800,000
REALISASI
582,136
600,000
TARGET
444,677 400,000
319,002 189,981
200,000
103,993 24,369
0 -
0
0 0 JAN
499,511 443,733 382,153 319,914 272,604 214,101 158,369
114,242 129,990 73,265 0 1,08652,037 FEB MAR APR MEI
JUN
JUL
AGT
SEP
OKT
NOP
DES
BULAN
TARGET PENYERAPAN 6 BULAN KEDEPAN KEGIATAN PELAKSANAAN DITJEN CIPTA KARYA TA 2009 Direktorat PBL
PELAKSANAAN
(x Rp. 1000)
TOTAL PAGU
JUNI
JULI
AGUSTUS
BULAN SEPTEMBER
OKTOBER
NOPEMBER
DESEMBER
84.17 1,180,444,887 191,546,490
93.09 1,344,551,517 164,106,630
100.00 1,446,921,038 102,369,521
1,448,854,588 FISIK % KEUANGAN (KOMULATIF) KEUANGAN (ABSOLUTE)
30.84 390,471,978 390,471,978
42.55 559,755,577 169,283,598
58.44 777,148,609 217,393,032
72.77 988,898,397 211,749,788
PENJELASAN KETERLAMBATAN PROGRES PENYERAPAN DANA (< 25%) DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN STATUS : 18 AGUSTUS 2009 NO
PROVINSI
1 Rehabilitasi dan Pembangunan Gedung Negara
2 Penataan Bangunan & Lingkungan Banten
PROGRES KEUANGAN
ALASAN KETERLAMBATAN
TINDAK LANJUT
22.89 1 Keterlambatan dikarenakan adanya kegiatan kenegaraan yang dilaksanakan di Istana Bogor sampai dengan tanggal 2 Agustus 2009, setelah tanggal tersebut baru diperbolehkan ada kegiatan fisik lagi. 2 Untuk Lokasi Cibodas, ada kebijakan pekerjaan ditunda sampai dengan tanggal 19 Agustus 2009 nerkenaan dengan adanya kegiatan HUT RI, setelah tanggal tersebut baru diperbolehkan melakukan kegiatan di Cibodas. 3 Pejabat Penerbit SPM meninggal dunia. 3 Sedang menunggu pergantian Pejabat Penerbit SPM. 22.89 1 Status PAKET Kota Cilegon difasilitasi dalam satu tahun (2008) 2 tahap : tahap.2 dan 3 1 Dilakukan pendampingan secara intens baik kepihak PEMDA dimana tahap 2 status progres penyerapan sudah 100% , oleh karena itu pada tahun yang Kota Cilegon dan POKJA PAKET , sudah disepakati oleh sama juga kota Cilegon mengakses PAKET tahap 3 yang diawali terlebih dahulu dilakukan KORKOT dan POKJA PAKET pada ahir bulan Juni 2009 fasilitasi fasilitasi SIKLUS PAKET untuk tahap 3 dan status progres penyerapan DANA PAKET tahap penyerapan DANA PAKET Termin 2 (50%) tahap 3 sudah siap 3 termin 1 ( 50 % ) sudah terserap , keterlambatan untuk termin 2 (50) tahap 3 hal ini untuk dilaksanakan. Jadwal Penyerapan ( Tanggal & Nilai ) : Rp. dikarenakan PAKET dilakukan terlebih dahulu dengan menjalankan siklus tahap 3 dan 186.215.500.evaluasi paket tahap 2 untuk memastikan kesiapan fasilitasi PAKET Tahap selanjutnya
CILEGON, PAKET Tahap 3 Termin 2 (NILAI PAGU : 3.000.000.000.-) 2 Dana PAKET tahap 3 tidak terserap secara maksimal dikarenakan : 1 Pengajuan Pencairan Dana PAKET tanggal 24 Juni 2009 a. Pihak Pem.Kota Cilegon tidak mengalokasikan pendamping PAKET dalam bentuk dana 2 Pencairan Dana PAKET ke Rekening Panitia Kemitraan tanggal Dana tunai. 29 Juni 2009. b. Terbatasnya cost sharring program dari APBD di lokasi BKM yang Berdaya sementara sebagian di lokasi terseleksi hanya di 4 BKM Berdaya. LEBAK, PAKET Tahap 2 Termin 1 (NILAI PAGU : 2.000.000.000.-) 1 Kegiatan PAKET di kabupaten Lebak juga telah dilakukan pada tahun 2008 dua tahap : tahap 1 ( termin 1 & 2 ) dan tahap 2 termin 1, keterlambatan penyerapan dana PAKET tahap 2 termin 2 di karenakan : Penyelesaian Laporan Ahir & Audit Pelaksanaan PAKET tahap1 sehingga dana PAKET yang sudah cair terlambat pemanfaatanya harus menunggu selesai kegiatan Laporan Ahir POKJA & Audit serta evaluasi PAKET tingkat kota serta tejadinya pengalihan leading sektor yang pada tahun 2008 di BAPPEDA pada tahun 2009 sudah di Dinas Cipta Karya PU Kab.Lebak
Sudah difasilitasi oleh Leading Sektor (PU CK) dan POKJA PAKET serta Askot Tim Advance untuk penyerapan Dana PAKET Tahap 2 termin 2 pada ahir bulan Juni 2009. Jadwal Penyerapan ( Tanggal & Nilai ) : Rp. 393.500.000.-
NO
PROVINSI
PROGRES KEUANGAN
ALASAN KETERLAMBATAN 2 Dana PAKET tahap 2 tidak terserap secara maksimal dikarenakan : a. Fasilitasi untuk PAKET tahap 2 posisi psudah penetapan anggaran maka Pihak Pem.Kab.Lebak tidak mengalokasikan pendamping PAKET dalam bentuk dana Dana tunai akan tetapi menagolkasikan bentuk program / kegiatan di lokasi kelurahan BKM.
TINDAK LANJUT
1 Pengajuan Pencairan Dana PAKET tanggal 24 Juni 2009. 2 Pencairan Dana PAKET ke Rekening Panitia Kemitraan tanggal 29 Juni 2009.
b. Terbatasnya cost sharring program dari APBD II di lokasi BKM yang Berdaya, sehingga Pagu Paket terserap tidak optimal. PAKET Tahap 3 (NILAI PAGU : 2.500.000.000.-) Dana PAKET tahap 3 tidak terserap secara makisimal (100 %) dikarenakan devisit * anggaran / APBD kabupaten Lebak.
Penyerapan dana PAKET tahap 3 termin 1. Bulan Oktober 2009. Dan termin bulan Nopember 2009. Fasilitasi SIKLUS PAKET tahap 3
* Pemda Mengalokasikan secara tunai / cash sebesar Rp. 1.000.000.000.KAB. TANGERANG, Tahap 2 Tahun 2009 (NILAI PAGU : 2.500.000.000.-) Dana PAKET terserap 100 %, Proses pelaksanaan Silkus Tahap 2 Pemda mengalokasdikan Fasilitasi SIKLUS PAKET tahap 2. Jadwal dana Sharring sebesar Rp.2.500.000.000.Penyerapan : 1. Termin 1 (50%) September 2009 2. Termin 2 (50%) Oktober 2009 KAB. PANDEGLANG, Tahap 3 tahun 2009 (NILAI PAGU : 3.000.000.000.-) Dana PAKET tidak dapat terserap maksimal dikarenakan tahun 2009 terjadi devisit Anggaran Fasilitasi SIKLUS PAKET tahap 3. Jadwal Pemda Mengalokasikan secara tunai / cash sebesar Rp. 1.400.000.000.Penyerapan : 1. Termin 1 (50%) Oktober 2009 2. Termin2 (50%) Nopember 2009 KOTA SERANG, Tahap 2 tahun 2009 ( NILAI PAGU : 2.500.000.000.-) Pemerintahan baru terbentuk pemekaran dari pemerinthan kabupaten Serang PAD kota Fasilitasi SIKLUS PAKET tahap 2. Jadwal Serang hanya 12 Milyar dan sisa anggaran hanya 3 M dan dibagi untuk kegiatan SKPD , Penyerapan : 1. Termin 1 (50%) Oktober 2009 sehingga Dana PAKET tidak dapat terserap maksimal dikarenakan tahun 2009 pihak 2. Termin2 (50%) Nopember 2009 Pemda Mengalokasikan secara tunai / cash sebesar Rp. 1.000.000.000.3 Penataan Bangunan & Lingkungan Jawa Barat 4 Penataan Bangunan & Lingkungan Kalimantan Barat
5 Penataan Bangunan & Lingkungan Kalimantan Timur 6 Penataan Bangunan & Lingkungan Sulawesi Tenggara
22.16 Permaslahan terkait dengan Surat Dirjen Perbendaharaan mengenai P2KP. 24.27 Ada 3 paket pekerjaan PIP2B yang masih dalam proses penentuan lokasi oleh Gubernur. Biro Perlengkapan sudah mengusulkan 2 alternatif kepada Gubernur. 22.00 Untuk kegiatan PAKET, ada permintaan revisi dana PAKET dikarenakan ada kelebihan dana 2,5 Miliar. 21.36
Sudah dikeluarkan surat dari Direktur PBL. Sudah dikirimkan surat kepada Gubernur untuk secepatnya menentukan loaksi. direncanakan dalam minggu ke-3 Bulan Juli 2009.
PROGRES PELAKSANAAN KEGIATAN DITJEN CIPTA KARYA Direktorat Bina Program A.
Saat ini progres pelaksanaan kegiatan yang telah dicapai yakni :
Direktorat Bina Program (x 1.000)
Progres Fisik (%) Keuangan (Rp) Keuangan (%)
Rencana penyerapan Minggu Target Penyerapan Minggu Ke-2 Bulan Agustus Ke-2 Bulan Agustus 69.63 215,018,825 64.79
48.79 136,109,786 41.01
Realisasi
Deviasi
43.81 124,782,249 37.60
-4.98 (11,327,537) -3.41
PERMASALAHAN UMUM : PERMASALAHAN DAN TINDAK LANJUT PROGRES KEGIATAN TA 2009 DIREKTORAT BINA PROGRAM STATUS : 18 Agustus 2009
NO
NAMA SATUAN KERJA
1 Pembinaan Pembangunan Infrastruktur Perdesaan
PERMASALAHAN
TINDAK LANJUT
1. Masih Terdapat proses revisi DIPA sebesar Rp. 25.000.000.000,- untuk cadangan BLM pada PPK PPIP yang belum disetujui oleh Ditjen Perbendaharaan, Departemen Keuangan
1 Menunggu persetujuan revisi Ditjen Perbendaharaan, Departemen Keuangan
2. Terdapat deviasi penyerapan sebesar 4.00 (Rp. 5.078.063.000)
1. Memproses pembayaran Termin 2 paket Konsultan KMT PPK PISEW sebesar ± Rp. 2.000.000.000,2. Memproses pembayaran uang muka dan pengadaan kendaraan roda 4 PPK PAMSIMAS sebesar ± Rp. 222.657.000,- serta uang muka 1 paket konsultan PPK PPIP sebesar ±Rp. 270.000.000
LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2009 DIREKTORAT BINA PROGRAM STATUS: 18 AGUSTUS 2009 NO
KODE SATKER a.
1 2
PLN
TOTAL
PAGU (Rp) SWAKELOLA + KONTRAKTUAL AP
BLM
PAKET KONTRAK NON FISIK TOTAL FISIK
JUMLAH PAKET DALAM PROSES PRA KONTRAK 1
2
3
4
5
6
7
8
Satker Pusat Direktorat Bina Program Pembinaan Pembangunan Infrastruktur Perdesaan
111,876,913 60,281,772 51,595,141
89,354,380 14,000,000 75,354,380
201,231,293 74,281,772 126,949,521
55,700,052 40,863,252 14,836,800
120,531,241 33,418,520 87,112,721
25,000,000 25,000,000
60 24 36
9 9
69 24 45
-
-
-
-
-
-
-
505730 505749 505755 505761 505812 505786 505806 505770 505792 505821 505840 505837 505843 505868 505852 505971 505993 505987 505874 505880 505899 505900 505962 505940 505931 505919 505956 505925 506007 506013 506022 506038
Satker Propinsi Pembangunan IP Nanggroe Aceh Darussalam Pembangunan IP Sumatera Utara Pembangunan IP Sumatera Barat Pembangunan IP Riau Pembangunan IP Kepri Pembangunan IP Sumatera Selatan Pembangunan IP Bangka Belitung Pembangunan IP Jambi Pembangunan IP Bengkulu Pembangunan IP Lampung Pembangunan IP Banten Pembangunan IP Jawa Barat Pembangunan IP Jawa Tengah Pembangunan IP Jawa Timur Pembangunan IP DI Yogyakarta Pembangunan IP Bali Pembangunan IP Nusa Tenggara Timur Pembangunan IP Nusa Tenggara Barat Pembangunan IP Kalimantan Barat Pembangunan IP Kalimantan Tengah Pembangunan IP Kalimantan Selatan Pembangunan IP Kalimantan Timur Pembangunan IP Sulawesi Barat Pembangunan IP Sulawesi Selatan Pembangunan IP Sulawesi Tengah Pembangunan IP Sulawesi Utara Pembangunan IP Sulawesi Tenggara Pembangunan IP Gorontalo Pembangunan IP Maluku Pembangunan IP Maluku Utara Pembangunan IP Papua Pembangunan IP Papua Barat
130,627,586 3,065,762 1,954,100 3,193,309 12,395,925 945,100 13,783,745 925,900 5,649,409 2,120,675 11,472,027 2,147,798 7,652,828 6,333,213 8,794,703 852,300 1,006,900 4,738,888 2,722,256 2,813,126 3,006,540 3,467,687 2,927,303 2,046,030 7,142,943 2,370,641 2,818,790 2,995,086 2,185,136 2,961,162 1,091,200 3,947,604 1,099,500
-
-
130,627,586 3,065,762 1,954,100 3,193,309 12,395,925 945,100 13,783,745 925,900 5,649,409 2,120,675 11,472,027 2,147,798 7,652,828 6,333,213 8,794,703 852,300 1,006,900 4,738,888 2,722,256 2,813,126 3,006,540 3,467,687 2,927,303 2,046,030 7,142,943 2,370,641 2,818,790 2,995,086 2,185,136 2,961,162 1,091,200 3,947,604 1,099,500
52,892,316 2,102,869 1,954,100 1,550,070 2,865,525 945,100 3,144,545 925,900 2,006,209 1,266,195 1,974,977 1,272,846 2,726,930 2,207,776 3,096,773 852,300 1,006,900 2,230,888 1,399,487 1,536,608 1,534,732 1,318,528 858,715 1,180,913 2,435,859 910,027 1,451,530 1,537,286 1,311,808 1,480,590 1,091,200 1,615,630 1,099,500
26,732,870 617,293 1,105,639 585,680 785,050 567,752 2,583,498 2,512,637 2,664,330 1,628,000 785,169 700,518 1,087,808 1,189,159 1,540,588 596,317 1,942,284 1,115,014 868,060 805,000 604,528 820,572 1,627,974 -
51,002,400 345,600 537,600 9,530,400 10,639,200 3,643,200 268,800 8,712,000 307,200 2,342,400 1,612,800 3,033,600 880,000 537,600 576,000 384,000 960,000 528,000 268,800 2,764,800 345,600 499,200 652,800 268,800 660,000 704,000 -
41 1 1 8 1 4 1 3 2 3 2 1 1 1 1 1 1 3 1 1 1 1 1 1 -
-
41 1 1 8 1 4 1 3 2 3 2 1 1 1 1 1 1 3 1 1 1 1 1 1 -
-
-
-
-
-
-
-
89,354,380
331,858,879
108,592,368
147,264,111
76,002,400
101
9
110
TOTAL
1 2 3 4 5 6 7 8 9 10
RUPIAH MURNI
466162 505138 b.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
PAGU NAMA SATUAN KERJA
Keterangan : Penyiapan Dokumen Lelang Pengumuman Lelang/Prakualifikasi Penyusunan shortlist Undangan Pelelangan Penjelasan Pekerjaan Aanwyzing Pemasukan Penawaran Usulan Pemenang Penetapan Pemenang Penerbitan Surat Perintah Mulai Kerja Penandatangan Kontrak
242,504,499
-
-
-
-
-
-
-
-
9 -
NILAI KONTRAK (Rp. x 1.000)
-
-
69 24 45
116,497,293 31,587,139 84,910,154
-
-
41 1 1 8 1 4 1 3 2 3 2 1 1 1 1 1 1 3 1 1 1 1 1 1 -
21,942,655 575,623 1,074,990 428,330 579,843 776,292 553,575 2,300,169 1,674,222 2,183,473 1,535,237 653,371 677,985 683,507 1,018,876 761,321 580,140 1,748,010 605,330 687,500 803,982 390,730 744,244 905,905 -
110
138,439,948
-
-
10
-
LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2009 DIREKTORAT BINA PROGRAM STATUS: 18 AGUSTUS 2009 ( x Rp. 1.000 ) KODE NO SATKER a. 1 2
NAMA SATUAN KERJA
Satker Pusat 466162 Direktorat Bina Program 505138 Pembinaan Pembangunan Infrastruktur Perdesaan
b. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
PAGU
505730 505749 505755 505761 505812 505786 505806 505770 505792 505821 505840 505837 505843 505868 505852 505971 505993 505987 505874 505880 505899 505900 505962 505940 505931 505919 505956 505925 506007 506013 506022 506038
Satker Propinsi Pembangunan IP Nanggroe Aceh Darussalam Pembangunan IP Sumatera Utara Pembangunan IP Sumatera Barat Pembangunan IP Riau Pembangunan IP Kepri Pembangunan IP Sumatera Selatan Pembangunan IP Bangka Belitung Pembangunan IP Jambi Pembangunan IP Bengkulu Pembangunan IP Lampung Pembangunan IP Banten Pembangunan IP Jawa Barat Pembangunan IP Jawa Tengah Pembangunan IP Jawa Timur Pembangunan IP DI Yogyakarta Pembangunan IP Bali Pembangunan IP Nusa Tenggara Timur Pembangunan IP Nusa Tenggara Barat Pembangunan IP Kalimantan Barat Pembangunan IP Kalimantan Tengah Pembangunan IP Kalimantan Selatan Pembangunan IP Kalimantan Timur Pembangunan IP Sulawesi Barat Pembangunan IP Sulawesi Selatan Pembangunan IP Sulawesi Tengah Pembangunan IP Sulawesi Utara Pembangunan IP Sulawesi Tenggara Pembangunan IP Gorontalo Pembangunan IP Maluku Pembangunan IP Maluku Utara Pembangunan IP Papua Pembangunan IP Papua Barat TOTAL
RUPIAH MURNI
SWAKELOLA + AP
PAGU (Rp) KONTRAKTUAL PHLN
PAGU TERKONTRAK
SISA PAGU KONTRAK
NILAI KONTRAK
PLN
TOTAL
BLM
RPM
PHLN
TOTAL
RPM
PHLN
TOTAL
111,876,913 60,281,772 51,595,141
89,354,380 14,000,000 75,354,380
201,231,293 74,281,772 126,949,521
55,700,052 40,863,252 14,836,800
31,176,861 19,418,520 11,758,341
89,354,380 14,000,000 75,354,380
120,531,241 33,418,520 87,112,721
25,000,000 25,000,000
31,176,861 19,418,520 11,758,341
89,354,380 14,000,000 75,354,380
120,531,241 33,418,520 87,112,721
27,889,461 17,587,139 10,302,322
88,607,832 14,000,000 74,607,832
116,497,293 31,587,139 84,910,154
3,287,400 1,831,381 1,456,019
130,627,586 3,065,762 1,954,100 3,193,309 12,395,925 945,100 13,783,745 925,900 5,649,409 2,120,675 11,472,027 2,147,798 7,652,828 6,333,213 8,794,703 852,300 1,006,900 4,738,888 2,722,256 2,813,126 3,006,540 3,467,687 2,927,303 2,046,030 7,142,943 2,370,641 2,818,790 2,995,086 2,185,136 2,961,162 1,091,200 3,947,604 1,099,500
-
130,627,586 3,065,762 1,954,100 3,193,309 12,395,925 945,100 13,783,745 925,900 5,649,409 2,120,675 11,472,027 2,147,798 7,652,828 6,333,213 8,794,703 852,300 1,006,900 4,738,888 2,722,256 2,813,126 3,006,540 3,467,687 2,927,303 2,046,030 7,142,943 2,370,641 2,818,790 2,995,086 2,185,136 2,961,162 1,091,200 3,947,604 1,099,500
52,892,316 2,102,869 1,954,100 1,550,070 2,865,525 945,100 3,144,545 925,900 2,006,209 1,266,195 1,974,977 1,272,846 2,726,930 2,207,776 3,096,773 852,300 1,006,900 2,230,888 1,399,487 1,536,608 1,534,732 1,318,528 858,715 1,180,913 2,435,859 910,027 1,451,530 1,537,286 1,311,808 1,480,590 1,091,200 1,615,630 1,099,500
26,732,870 617,293 1,105,639 585,680 785,050 567,752 2,583,498 2,512,637 2,664,330 1,628,000 785,169 700,518 1,087,808 1,189,159 1,540,588 596,317 1,942,284 1,115,014 868,060 805,000 604,528 820,572 1,627,974 -
-
26,732,870 617,293 1,105,639 585,680 785,050 567,752 2,583,498 2,512,637 2,664,330 1,628,000 785,169 700,518 1,087,808 1,189,159 1,540,588 596,317 1,942,284 1,115,014 868,060 805,000 604,528 820,572 1,627,974 -
51,002,400 345,600 537,600 9,530,400 10,639,200 3,643,200 268,800 8,712,000 307,200 2,342,400 1,612,800 3,033,600 880,000 537,600 576,000 384,000 960,000 528,000 268,800 2,764,800 345,600 499,200 652,800 268,800 660,000 704,000 -
25,624,897 617,293 1,105,639 436,000 585,680 785,050 567,752 2,583,498 1,840,637 2,664,330 1,628,000 785,169 700,518 1,087,808 1,189,159 1,540,588 596,317 1,942,284 1,115,041 700,060 805,000 604,528 820,572 923,974
-
25,624,897 617,293
-
21,942,655 575,623 1,074,990 428,330 579,843 776,292 553,575 2,300,169 1,674,222 2,183,473 1,535,237 653,371 677,985 683,507 1,018,876 761,321 580,140 1,748,010 605,330 687,500 803,982 390,730 744,244 905,905 -
3,682,242 41,670
1,105,639 436,000 585,680 785,050 567,752 2,583,498 1,840,637 2,664,330 1,628,000 785,169 700,518 1,087,808 1,189,159 1,540,588 596,317 1,942,284 1,115,041 700,060 805,000 604,528 820,572 923,974 -
21,942,655 575,623 1,074,990 428,330 579,843 776,292 553,575 2,300,169 1,674,222 2,183,473 1,535,237 653,371 677,985 683,507 1,018,876 761,321 580,140 1,748,010 605,330 687,500 803,982 390,730 744,244 905,905 -
242,504,499
89,354,380
331,858,879
108,592,368
57,909,731
89,354,380
147,264,111
76,002,400
56,801,758
89,354,380
146,156,138
49,832,116
138,439,948
6,969,642
RPM
TOTAL
88,607,832
RPM
30,649 7,670 5,837 8,758 14,177 283,329 166,415 480,857 92,763 131,798 22,533 404,301 170,283 779,267 16,177 194,274 509,711 12,560 1,018 213,798 76,328 18,069 -
PHLN
TOTAL
746,548 746,548
4,033,948 1,831,381 2,202,567
-
3,682,242 41,670 30,649 7,670 5,837 8,758 14,177 283,329 166,415 480,857 92,763 131,798 22,533 404,301 170,283 779,267 16,177 194,274 509,711 12,560 1,018 213,798 76,328 18,069 -
746,548
7,716,190
-
RENCANA PENYERAPAN DAN PROGRES KEUANGAN DIREKTORAT BINA PROGRAM STATUS: 18 AGUSTUS 2009 ( X Rp. 1000 )
NO
KODE SATKER
PAGU NAMA SATUAN KERJA RUPIAH MURNI
1 2
Satker Pusat 466162 Direktorat Bina Program 505138 Pembinaan Pembangunan Infrastruktur Perdesaan
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
505730 505749 505755 505761 505812 505786 505806 505770 505792 505821 505840 505837 505843 505868 505852 505971 505993 505987 505874 505880 505899 505900 505962 505940 505931 505919 505956 505925 506007 506013 506022 506038
Satuan Propinsi Pembangunan IP Nanggroe Aceh Darussalam Pembangunan IP Sumatera Utara Pembangunan IP Sumatera Barat Pembangunan IP Riau Pembangunan IP Kepri Pembangunan IP Sumatera Selatan Pembangunan IP Bangka Belitung Pembangunan IP Jambi Pembangunan IP Bengkulu Pembangunan IP Lampung Pembangunan IP Banten Pembangunan IP Jawa Barat Pembangunan IP Jawa Tengah Pembangunan IP Jawa Timur Pembangunan IP DI Yogyakarta Pembangunan IP Bali Pembangunan IP Nusa Tenggara Timur Pembangunan IP Nusa Tenggara Barat Pembangunan IP Kalimantan Barat Pembangunan IP Kalimantan Tengah Pembangunan IP Kalimantan Selatan Pembangunan IP Kalimantan Timur Pembangunan IP Sulawesi Barat Pembangunan IP Sulawesi Selatan Pembangunan IP Sulawesi Tengah Pembangunan IP Sulawesi Utara Pembangunan IP Sulawesi Tenggara Pembangunan IP Gorontalo Pembangunan IP Maluku Pembangunan IP Maluku Utara Pembangunan IP Papua Pembangunan IP Papua Barat TOTAL
111,876,913 60,281,772 51,595,141 130,627,586 3,065,762 1,954,100 3,193,309 12,395,925 945,100 13,783,745 925,900 5,649,409 2,120,675 11,472,027 2,147,798 7,652,828 6,333,213 8,794,703 852,300 1,006,900 4,738,888 2,722,256 2,813,126 3,006,540 3,467,687 2,927,303 2,046,030 7,142,943 2,370,641 2,818,790 2,995,086 2,185,136 2,961,162 1,091,200 3,947,604 1,099,500 242,504,499
RENCANA PENYERAPAN TARGET PENYERAPAN MINGGU KE-2 BULAN MINGGU KE-2 BULAN AGUSTUS AGUSTUS FISIK FISIK KEUANGAN (RP) KEUANGAN (RP) (%) (%)
PLN
TOTAL
89,354,380 14,000,000 75,354,380
201,231,293 74,281,772 126,949,521
131,957,804 47,399,975 84,557,829
69.40 70.53 68.73
79,016,069 39,293,142 39,722,928
46.05 55.57 40.48
130,627,586 3,065,762 1,954,100 3,193,309 12,395,925 945,100 13,783,745 925,900 5,649,409 2,120,675 11,472,027 2,147,798 7,652,828 6,333,213 8,794,703 852,300 1,006,900 4,738,888 2,722,256 2,813,126 3,006,540 3,467,687 2,927,303 2,046,030 7,142,943 2,370,641 2,818,790 2,995,086 2,185,136 2,961,162 1,091,200 3,947,604 1,099,500 331,858,879
83,061,020 1,961,787 1,307,996 1,925,162 8,334,647 631,083 9,265,719 609,636 3,779,869 1,279,883 7,711,542 1,290,210 4,961,939 3,970,802 5,347,089 554,128 701,021 2,795,829 1,613,591 1,677,842 1,781,123 2,030,487 1,738,495 1,226,248 4,559,898 1,597,700 1,680,813 1,781,311 1,304,006 1,730,115 762,582 2,378,450 770,019 215,018,825
69.99 69.27 72.93 66.25 74.63 72.37 74.61 71.92 74.20 66.01 74.61 65.47 70.92 67.84 67.17 71.19 75.19 64.44 64.79 65.71 65.34 64.69 65.48 65.56 70.59 73.51 65.68 65.01 65.80 64.61 75.39 65.90 75.52 69.63
57,093,717 1,348,935 859,804 1,405,056 5,454,207 392,217 6,064,848 384,249 2,485,740 933,097 5,047,692 945,031 3,367,244 2,786,614 3,869,669 375,012 443,036 2,085,111 1,197,793 1,237,775 1,247,714 1,525,782 1,288,013 900,253 2,964,321 1,043,082 1,240,268 1,317,838 906,831 1,302,911 452,848 1,736,946 483,780 136,109,786
53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00 48.79
89,354,380
REALISASI
DEVIASI
PHLN
TOTAL
KEU. %
40,281,683 29,950,818 10,330,865
41,580,127 7,110,002 34,470,125
81,861,810 37,060,820 44,800,990
40.68 49.89 35.29
48.23 50.97 46.63
2,845,741 -2,232,322 5,078,063
1.41 -3.01 4.00
42,920,439 1,143,957 976,095 1,210,184 2,804,363 501,648 4,746,534 522,642 1,863,689 629,336 3,284,010 468,990 2,162,734 1,532,501 2,872,934 370,066 282,335 1,527,119 953,257 903,267 1,055,793 1,090,159 967,791 629,953 3,704,971 884,462 1,214,889 1,153,579 906,934 1,031,205 451,529 597,008 476,505 83,202,122
41,580,127
42,920,439 1,143,957 976,095 1,210,184 2,804,363 501,648 4,746,534 522,642 1,863,689 629,336 3,284,010 468,990 2,162,734 1,532,501 2,872,934 370,066 282,335 1,527,119 953,257 903,267 1,055,793 1,090,159 967,791 629,953 3,704,971 884,462 1,214,889 1,153,579 906,934 1,031,205 451,529 597,008 476,505 124,782,249
32.86 37.31 49.95 37.90 22.62 53.08 34.44 56.45 32.99 29.68 28.63 21.84 28.26 24.20 32.67 43.42 28.04 32.23 35.02 32.11 35.12 31.44 33.06 30.79 51.87 37.31 43.10 38.52 41.50 34.82 41.38 15.12 43.34 37.60
36.99 37.41 49.95 38.27 22.68 53.08 36.99 56.45 34.84 42.46 28.64 25.05 38.68 30.58 42.45 43.43 74.29 32.22 36.45 36.79 44.30 33.63 41.21 34.33 53.32 37.31 56.22 38.53 46.01 46.26 41.38 22.99 43.34 43.81
(14,173,278) -204,978 116,291 -194,872 -2,649,844 109,432 -1,318,314 138,394 -622,051 -303,761 -1,763,682 -476,041 -1,204,510 -1,254,113 -996,735 -4,946 -160,701 -557,992 -244,536 -334,508 -191,921 -435,623 -320,222 -270,300 740,650 -158,620 -25,379 -164,259 103 -271,706 -1,319 -1,139,938 -7,275 (11,327,537)
-10.85 -6.69 5.95 -6.10 -21.38 11.58 -9.56 14.95 -11.01 -14.32 -15.37 -22.16 -15.74 -19.80 -11.33 -0.58 -15.96 -11.77 -8.98 -11.89 -6.38 -12.56 -10.94 -13.21 10.37 -6.69 -0.90 -5.48 0.00 -9.18 -0.12 -28.88 -0.66 -3.41
RUPIAH MURNI
FISIK %
KEUANGAN (RP) %
RENCANA DAN REALISASI PENYERAPAN DIREKTORAT BINA PROGRAM TAHUN ANGGARAN 2009 331,859
350,000
321,380
331,859
300,587 300,000
271,943 236,024
DALAM JUTAAN RUPIAH
250,000 194,014
200,000
PAGU
154,988
RENCANA
150,000
REALISASI
112,258 100,000
76,919 47,215
50,000
22,439 6,716
0 -
0
0
0 JAN
0 1,409 FEB
124,782 105,102
TARGET
81,042 73,233 60,779 47,600 40,125
14,242 32,058 3,29514,242 MAR
APR
MEI
JUN
JUL
AGT
SEP
OKT
NOP
DES
BULAN
TARGET PENYERAPAN 6 BULAN KEDEPAN KEGIATAN PELAKSANAAN DITJEN CIPTA KARYA TA 2009 Direktorat BP
PELAKSANAAN
(x Rp. 1000)
TOTAL PAGU
JUNI
JULI
AGUSTUS
BULAN SEPTEMBER
OKTOBER
NOPEMBER
DESEMBER
331,858,879 FISIK % KEUANGAN (KOMULATIF) KEUANGAN (ABSOLUTE)
22.94 79,002,374 79,002,374
32.26 109,725,336 30,722,962
48.79 162,494,237 52,768,900
65.88 219,679,531 57,185,294
81.03 269,483,043 49,803,512
89.91 298,267,235 28,784,192
100.00 331,858,879 33,591,644
PENJELASAN KETERLAMBATAN PROGRES PENYERAPAN DANA DIREKTORAT BINA PROGRAM STATUS : 18 Agustus 2009
No
1
2
Propinsi
Riau
Banten
Progress
22.62%
21.84%
Permasalahan
Tindak Lanjut
Telah dilaporkan kepada Kasatker Bendaharawan dan Penguji kurang sinkronisasi untuk segera disinkronisasi dan dengan PPK sehingga memperlambat pencairan. diharapkan proses pencairan dapat dipercepat. - Pencairan biaya konsultan randal - Ada pergantian konsultan pendamping Randal sedang diproses di KPPN. Akhir karena konsultan yang sebelumnya bulan ini diperkirakan sudah dapat mengundurkan diri. Sehingga harus melakukan dicairkan. tandatangan kontrak dengan konsultan yang baru. Ditambah dengan adanya kendala administrasi yang membuat pengajuan pencairan terlambat. - Minggu depan kegiatan monitoring - Belum ada kegiatan monitoring ke lapangan, baik ke lapangan akan dimulai, untuk PPIP dan Randal. Sehingga alokasi diharapkan akhir bulan sudah bisa perjalanan dinas belum diserap. terserap.
3
Jawa Tengah
24.20%
Konsultan Randal yang direkrut untuk tahun 2009 hanya 4 orang dari 12 orang yang dianggarkan. Hal ini dikarenakan kegiatan randal telah diselesaikan di 2008 dengan anggaran yang ada. Saat ini hanya tinggal kegiatan penyempurnaan dan perbaikan.
4
Papua
15.12%
Gaji fasilitator PPIP (4 bulan) belum dicairkan, Saat ini sudah di KPPN, diperkirakan dikarenakan fasilitator kesulitan membuka 20 Agustus 2009 seluruh gaji fasilitator PPIP (4 bulan) akan cair. rekening di daerah pelosok.
Akan ada pagu Randal yang tidak akan terserap (kurang lebih sebesar 400 juta), dan membuat progress keuangan Randal selalu kecil.
PROGRES PELAKSANAAN KEGIATAN DITJEN CIPTA KARYA SetDitjen Cipta Karya A.
Saat ini progres pelaksanaan kegiatan yang telah dicapai yakni :
Sekretariat Direktorat Jenderal (x 1.000)
Progres Fisik (%) Keuangan (Rp) Keuangan (%)
Rencana penyerapan Minggu Target Penyerapan Minggu Ke-2 Bulan Agustus Ke-2 Bulan Agustus 77.73 71,862,336 73.49
65.61 57,349,426 58.65
Realisasi 59.89 56,582,350 57.87
Deviasi -5.72 (767,076) -0.78
LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2009 SEKRETARIAT JENDERAL CIPTA KARYA STATUS: 18 AGUSTUS 2009 NO
KODE SATKER
1
622213
PAGU (Rp)
PAGU NAMA SATUAN KERJA
RUPIAH MURNI
PLN
TOTAL
SWAKELOLA + AP
KONTRAKTUAL
Direktorat Jenderal Cipta Karya
97,782,482
-
97,782,482
61,117,687
36,664,795
TOTAL
97,782,482
-
97,782,482
61,117,687
36,664,795
Keterangan : 1 Penyiapan Dokumen Lelang 2 Pengumuman Lelang/Prakualifikasi 3 Penyusunan shortlist 4 Undangan Pelelangan 5 Penjelasan Pekerjaan Aanwyzing 6 Pemasukan Penawaran 7 Usulan Pemenang 8 Penetapan Pemenang 9 Penerbitan Surat Perintah Mulai Kerja 10 Penandatangan Kontrak
PAKET KONTRAK NON FISIK TOTAL FISIK
BLM
-
JUMLAH PAKET DALAM PROSES PRA KONTRAK 1
2
3
4
5
6
7
8
9
10
NILAI KONTRAK (Rp. x 1.000)
5
42
47
-
3
2
-
2
9
-
-
2
29
23,625,813
5
42
47
-
3
2
-
2
9
-
-
2
29
23,625,813
LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2009 SEKRETARIAT JENDERAL CIPTA KARYA STATUS: 18 AGUSTUS 2009 NO 1
KODE SATKER 622213
PAGU NAMA SATUAN KERJA
RUPIAH MURNI
PLN
TOTAL
SWAKELOLA + AP
RPM
Direktorat Jenderal Cipta Karya
97,782,482
-
97,782,482
61,117,687
36,664,795
TOTAL
97,782,482
-
97,782,482
61,117,687
36,664,795
PAGU (Rp) KONTRAKTUAL PHLN
-
( x Rp. 1.000 ) PAGU TERKONTRAK
TOTAL
BLM
RPM
36,664,795
-
27,140,037
36,664,795
-
27,140,037
PHLN
-
SISA PAGU KONTRAK
NILAI KONTRAK TOTAL
RPM
27,140,037
23,625,813
27,140,037
23,625,813
PHLN
-
TOTAL
RPM
23,625,813
3,514,224
23,625,813
3,514,224
PHLN
TOTAL -
3,514,224 -
3,514,224
RENCANA PENYERAPAN DAN PROGRES KEUANGAN SEKRETARIAT JENDERAL CIPTA KARYA STATUS: 18 AGUSTUS 2009
NO
KODE SATKER
PAGU NAMA SATUAN KERJA RUPIAH MURNI
Satker Pusat 1 622213 Direktorat Jenderal Cipta Karya TOTAL
PLN
TOTAL
RENCANA PENYERAPAN TARGET PENYERAPAN MINGGU KE-2 BULAN MINGGU KE-2 BULAN AGUSTUS AGUSTUS FISIK FISIK KEUANGAN (RP) KEUANGAN (RP) (%) (%)
( X Rp. 1000 ) REALISASI
RUPIAH MURNI
DEVIASI
TOTAL
PHLN
KEU.
FISIK
%
%
KEUANGAN (RP)
%
97,782,482
-
97,782,482
71,862,336
77.73
57,349,426
65.61
56,582,350
-
56,582,350
57.87
59.89
(767,076)
-0.78
97,782,482
-
97,782,482
71,862,336
77.73
57,349,426
65.61
56,582,350
-
56,582,350
57.87
59.89
-767,076
-0.78
97,782,482
-
97,782,482
71,862,336
77.73
57,349,426
65.61
56,582,350
-
56,582,350
57.87
59.89
(767,076)
-0.78
RENCANA DAN REALISASI PENYERAPAN SETDITJEN TAHUN ANGGARAN 2009 120,000 97,782 100,000
89,491
94,083
97,782
DALAM JUTAAN RUPIAH
82,812 75,989
80,000 67,735 60,000
40,000 21,385 20,000 4,825
0 -
PAGU
53,712
0
0
0 JAN
8,807 0 1,467 FEB
56,582.4 51,566.2
RENCANA REALISASI
44,286.1 42,171.0 38,744 31,126 33,167 28,010
TARGET
14,450 14,128 21,521 11,27814,128 MAR
APR
MEI
JUN
JUL
AGT
SEP
OKT
NOP
DES
BULAN
TARGET PENYERAPAN 6 BULAN KEDEPAN KEGIATAN PELAKSANAAN DITJEN CIPTA KARYA TA 2009 SEKRETARIAT JENDERAL CIPTA KARYA
PELAKSANAAN
TOTAL PAGU
(x Rp. 1000)
JUNI
JULI
AGUSTUS
BULAN SEPTEMBER
OKTOBER
NOPEMBER
DESEMBER
97,782,482 FISIK % KEUANGAN (KOMULATIF) KEUANGAN (ABSOLUTE)
46.15 44,148,790 44,148,790
53.59 51,316,246 7,167,456
65.61 63,382,605 12,066,359
75.69 72,447,041 9,064,436
88.09 84,865,415 12,418,374
97.54 93,049,809 8,184,394
100.00 97,782,482 4,732,673
PROGRES PELAKSANAAN KEGIATAN DITJEN CIPTA KARYA Pembangunan Infrastruktur Permukiman Kabupaten/Kota A.
Saat ini progres pelaksanaan kegiatan yang telah dicapai yakni :
Satker Kabupaten/Kota Program Pemberdayaan Masyarakat (x 1.000)
Progres Fisik (%) Keuangan (Rp) Keuangan (%)
Rencana penyerapan Minggu Target Penyerapan Minggu Ke-2 Bulan Agustus Ke-2 Bulan Agustus 54.07 1,330,453,307 52.01
34.14 1,015,787,750 39.71
Realisasi 25.19 541,334,301 21.16
Deviasi -8.95 (474,453,449) -18.55
RENCANA PENYERAPAN DAN PROGRES KEUANGAN SATKER KABUPATEN/KOTA STATUS: 18 AGUSTUS 2009 ( X Rp. 1000 ) PAGU NO
NAMA SATUAN KERJA RUPIAH MURNI
PLN
TOTAL
RENCANA PENYERAPAN TARGET PENYERAPAN MINGGU KE-2 BULAN MINGGU KE-2 BULAN AGUSTUS AGUSTUS FISIK FISIK KEUANGAN (RP) KEUANGAN (RP) (%) (%)
DEVIASI
REALISASI RUPIAH MURNI
PHLN
TOTAL
KEU.
FISIK
%
%
1 P2KP
-
1,040,015,985
1,040,015,985
486,647,842
60.00
276,256,750
27.93
-
184,333,590
184,333,590
17.72
17.72
2 PPIP
350,000,000
431,000,000
781,000,000
295,656,250
46.48
303,975,000
23.91
43,400,000
7,200,000
50,600,000
6.48
6.43
KEUANGAN (RP)
(91,923,160)
%
(8.84)
(253,375,000) (32.44)
3 PAMSIMAS
-
317,625,000
317,625,000
194,199,215
2.10
81,606,000
2.05
-
57,252,681
57,252,681
18.03
36.67
4 RISE
-
419,500,000
419,500,000
353,950,000
92.86
353,950,000
92.86
-
249,148,030
249,148,030
59.39
69.96
(104,801,970) (24.98)
350,000,000
2,208,140,985
2,558,140,985
1,330,453,307
54.07
1,015,787,750
34.14
43,400,000
497,934,301
541,334,301
21.16
25.19
(474,453,449)
TOTAL
(24,353,319)
(7.67)
-18.55
RENCANA DAN REALISASI PENYERAPAN SATKER KABUPATEN/KOTA TAHUN ANGGARAN 2009 3,000,000 2,558,141
2,558,141 2,366,929
2,500,000
DALAM JUTAAN RUPIAH
2,135,033 1,901,363
2,000,000 1,535,217
PAGU
1,500,000
RENCANA
1,125,689 1,000,000
REALISASI TARGET
759,729 514,606
500,000 36,010
0 -
0
-
JAN
225,199
138,966 -FEB
309,017
7,542 -
7,542 MAR
59,151 APR
541,334 453,395 373,891 311,143 230,996 144,057 81,774 MEI
JUN
JUL
AGT
SEP
OKT
NOP
DES
BULAN
TARGET PENYERAPAN 6 BULAN KEDEPAN KEGIATAN PELAKSANAAN DITJEN CIPTA KARYA TA 2009 PEMBERDAYAAN
PELAKSANAAN
(x Rp. 1000)
TOTAL PAGU
JUNI
JULI
AGUSTUS
BULAN SEPTEMBER
OKTOBER
NOPEMBER
DESEMBER
34.13 1,195,941,000 360,306,500
56.30 1,701,665,000 505,724,000
78.47 2,161,649,500 459,984,500
95.42 2,445,154,500 283,505,000
100.00 2,558,140,500 112,986,000
2,558,140,985 FISIK % KEUANGAN (KOMULATIF) KEUANGAN (ABSOLUTE)
11.28 353,774,000 353,774,000
22.98 835,634,500 481,860,500
vPPIP
REKAPITULASI PERMASALAHAN PPIP 2009 PER KABUPATEN / KOTA STATUS 18 Agustus 2009
NO. 1
2
PROPINSI KALIMANTAN TIMUR
PAPUA
KABUPATEN / KOTA Kutai Timur
Nduga
Tolikara
PERMASALAHAN 1
TINDAK LANJUT
Catatan : Perubahan Nama berdasarkan surat Plt.Kepala Dinas PU Kab. KUTIM No.600/444/DPU-KT/V/2009 Tanggal 12 Mei 2009. mengenai tidak adanya desa Makmur Raya di Kecamatan Kongbeng dan desa Suka Makmur yg seharusnya berada di Kecamatan Long Mesangat, dan perubahan Desa Makmur Raya di Kec.Kombeng menjadi Desa Muara Pantun Kec.Telen.
KETERANGAN
Catatan : Perubahan nama desa yang semula desa Ba Muang Diganti menjadi Be Nuang
1
Letak geografis Kabupaten Nduga yang sangat sulit sehingga susah untuk dijangkau maka transportasi satu-satunya digunakan adalah pesat terbang yang dimana sekali penerbangan memerlukan biaya antara Rp. 25.000.000 smp Rp. 30.000.000.
Meminta agar Satker PPIP Kabupaten Nduga untuk membuat surat resmi secepatnya kepada Bupati mengingat tahapan kegiatan udah berjalan dan sangat mendesak sebelum tahapan pelaksanaan berjalan.
2
Kabupaten Nduga merupakan kabupaten baru dimana saat ini belum memiliki Bank baik pemerintah maupun swasta sehingga pada saat pencairan untuk 11 kampung pencairanya dilakukan di Kabupaten Jayawija sehingga memerlukan biaya yang tinggi.
Mengingat dalam pedoman pelaksanaan tidak terdapat Satker menandatangani pesimen pada rekening OMS maka diperlukan surat penegasan dari Satker PPIP, agar Satker Kabupaten dapat mengambil dana OMS ke Bank yang ada diwamena dan selanjutnya dana tersebut diserahkan Satker Kabupaten ke masing-masing OMS di ibu kota Kabupaten Nduga.
3
Mengingat 11 desa yang mendapatkan kegiatan PPIP di Kabupaten Nduga yang dimana lokasi 11 desa ini harus dilalui dengan berjalan kaki tanpa kendaraan bermotor maka mengamanan yang baik agar dana PPIP dapat terserap didesa masing-masing.
Meminta surat dari Satker PPIP Pusat perihal persetujuan pelaksanaan pencairan dana PPIP Kabupaten Nduga untuk dua kali tahapan yaitu 40% dan 60%.
1
Kabupaten Tolikara mendapatkan 20 desa sararan dan 10 desa terdapat diKecamatan Melawi dan sisanya di 4 Kecamatan. Permasalahan yang dihadapai dilapangan adalah desa-desa tersebut sulit dijangkau oleh kendaraan karena jalan baru berupa jalan tanah, diKecamatan Wina terdapat 3 desa harus dilalui dengan pesawat terbang yang memerlukan biaya yang besar.
Mengingat 20 desa yang ada di Kabupaten Tolikara hampir semua lokasi sulit dijangkau maka meminta agar Satker PIP Pusat untuk membantu penambahan biaya operasional bagi Fasilitator mengingat biaya transportasi yang begitu mahal. Meminta perhatian pemerintahan Tolikara agar dapat membantu biaya operasional buat OMS.
2
Kabupaten Tolikara telah melaksanakan pencairan tahap I kendala utama sekarang masyarakat kesulitan untuk pulang desa masing-masing karena sulitnya transportasi dan belum adanya perhatian pemerintah daerah sehingga menghambat pelaksanaan.
3
Banyak masalah yang dihadapi dilapangan yang belum terselesaikan diakibatkan kurangnya pertemuan pengambil keputusan didaerah dan tidak tersedianya dana pendamping yang dialokasi dari APBD Kabupaten.
Mengingat dalam pedoman pelaksanaan tidak terdapat Satker menandatangani pesimen pada rekening OMS maka diperlukan surat penegasan dari Satker PIP Pusat, agar Satker Kabupaten dapat mencairkan dana masyarakat mengingat besarnya biaya transportasi dan mengantisipasi penyimpangan dana masyarakat. Untuk pencairan tahap II melalui Satker Kabupaten dapat mencaikan di Bank selanjutkan diserahkan ke lokasi masingmasing desa sehingga OMS tidak perlu lagi datang ke Wamena mengingat mahalnya biaya transport.
NO.
PROPINSI
KABUPATEN / KOTA Yahukimo
Yapen Waropen
PERMASALAHAN
TINDAK LANJUT
1
Lokasi yang mendapatkan dana PPIP 2009 untuk Kabupaten Yahukimo di Kecamatan Ubalihi sebanyak 5 desa dan lokasi desa-desa tersebut harus dijangkau dengan pesawat terbang atau melewati jalan darat dari Wamena tapi dengan syarat tidak hujan.
Meminta keseriusan pemerintahan daerah untuk membantu memfasilitasi agar permasalahan cepat terselesaikan mengingat waktu yang semakin sempit. Memintah Satker PIP Pusat untuk membuat surat penekanan untuk membantu pelaksanaan kegiatan.
2
Kabupaten Yahukimo mendapatkan 5 desa dimana semua desa tersebut lokasinya sangat sulit tranportasi dan rawan pada saat pencairan karena apabila dana tersebut cair di bank belum tentu hari itu juga OMS bisa membawa ke desanya karena masalah transportasi ke lokasi masingmasing.
Sebelum tahapan pencairan dilakukan kami minta surat dari Satker PIP Pusat perihal persetujuan pelaksanaan pencairan dana PPIP Kabupaten Yahukimo untuk dua kali tahapan yaitu 40% dan 60% agar kami dapat mensosilisakan kepada masyarakat. Agar biaya yang menjadi tangungan OMS tidak terbeban lagi.
3
Akibat dari cuaca yang tidak bersahabat akhir-akhir ini maka pencairan untuk Untuk pencairan tahap II melalui Satker Kabupaten dapat tahap I belum bisa dilaksanakan meskipun realisasi fisik telah berjalan 60%. mencaikan di Bank selanjutkan diserahkan ke lokasi masingmasing desa sehingga OMS tidak perlu lagi datang ke Wamena mengingat mahalnya biaya transport.
1
Kabupaten Yapen Waropen dari 11 Desa 5 dari desa tersebut letak desanya Meminta kepada Satker PIP Pusat untuk penambahan dana transporasi bagi Fasilitator mengingat lokasi alam yang sangat normal sedang 6 desa yang lainya adalah sanggat sulit karena harus sulit dijangkau. menyembrang pulau yang dimana bisa dilalui dengan mengunakan motor tempel saja tapi harus memperhitungkan cuaca.
2
Dari 11 Desa yang ada`6 diantaranya dalam tahap pelaksanaan penyerapan dana akan terkendala oleh alam dimana cuaca yang kurang bersahabat dan mahalnya biaya transportasi bagi masyarakat untuk mencaikan dana di Kota Serui.
Mengingat dalam pedoman pelaksanaan tidak terdapat Satker menandatangani psimen pada rekening OMS maka diperlukan surat penegasan dari Satker PPIP, agar Satker Kabupaten membantu mencairkan dana tersebut mengingat kesulitan yang dihadapi oleh masyarakat.
KETERANGAN
vPPIP-RIS PERMASALAHAN DAN TINDAK LANJUT RIS-PNPM TA. 2009 Status 18 Agustus 2009 No Propinsi 1 Jambi
2
Sumatera Selatan
Kabupaten / Kota Bungo dan Tebo
Isu Pokok Uraian Permasalahan Rencana Tindak Lanjut PJM Pronangkis dan RKM untuk OMS tidak mendapatkan dukungan yang Tim NPMC telah ke lapangan dari tanggal 30 2 desa contoh di Propinsi Jambi cukup dari FM dan RPMC untuk menyusun Juli sampai dengan tanggal 3 Agustus 2009 belum selesai PJM Pronangkis dan RKM tersebut untuk memberikan bimbingan dan fasilitasi penyusunan PJM Pronangkis dan RKM
Keterangan PCMU segera menghubungi satker kabupaten Bungo dan Tebo propinsi Jambi untuk segera memberikan dukungan kepada OMS agar menyelesaikan PJM Pronangkis dan RKM sampai akhir minggu ke 2 bulan agustus 2009
PJM Pronangkis dan RKM untuk Masih banyak dokumen pendukung PJM Pronangkis dan RKM yang harus 2 desa contoh di Propinsi Sumatera Selatan belum selesai dikumpulkan oleh FM dan RPMC
1. PCMU segera menghubungi Satker Propinsi Sumatera Selatan agar menegur RPMC sehubungan dengan keterlambatan penyusunan PJM Pronangkis dan RKM
Telah dilakukan koordinasi dengan RPMC untuk segera memberikan bimbingan atau bantuan kepada OMS untuk segera menyelesaikan PJM Pronangkis dan RKM
2. NPMC akan memberikan bantuan asistensi dalam penyusunan PJM Pronangkis dan RKM yang diharapkan bisa selesai dalam minggu ke 2 bulan Agustus 3
Riau
Sorolangun, Tebo, Bungo, Kerinci Kinerja FM kurang maksimal pada Cluster IV (Sarolangun, Tebo, Bungo dan Kerinci) di Propinsi Riau
Konsultan RPMC kurang memberikan dukungan dan bimbingan kepada FM sehingga kerja FM kurang optimal
PCMU mendorong RPMC untuk lebih intensif dalam melakukan koordinasi, komunikasi, dan bimbingan kepada FM
NPMC akan membantu memfasilitasi penguatan koordinasi dan komunikasi antara RPMC dan FM