Pictures of the future A selection of Sketches, Illustrations, Diagrams and Visualizations from Except's portfolio. v2.3 May 2012
1
Dear reader, All work on the following pages has been conceptualized, engineered, designed and visualized by Except. We're excited about the large variety of work our multi disciplinary team has been able to perform over the last decade. We find proof in these results that collaboration between scientists, engineers, designers and developers simply works. We use illustration and visualization to bring life to our ideas, and we love these images that continue to inspire people around the world. We hope you enjoy this small collection of our imagery. For more information on these and other projects, visit our website at www.except.nl, or give us a call. Tom Bosschaert Excecutive Director, Except Integrated sustainability +31 10 7370215
[email protected]
2
client: Wesleyan University / Richard Meier & Partners Wesleyan Teaching Museum / Rome Apartments 3
client: Catholic Sisterhood of Toronto, Canada Ecological Spiritual chapel & community Centre 4
client: Boston Development Authority 5
Fujifilm Wind Park | System Map Nuclear (2,0%) Wind Other (4,6%) (8,5%)
Total Cost of Electricity by Source (€ per GWh)
€
Coal (9,2%)
Hydro (14,3%)
Natural Gas (60%)
81,000 €
NUCLEAR
69,000 €
67,500 €
WIND
COAL
47,000 €
GAS
Development of the Fujifilm wind park required 1FTE for 2 years.
Eneco Energy Mixture Sold
21GWh installed wind power can fuel 6,000 homes
Construction of the Fujifilm wind park required 10 FTE for 1 year, including contractors.
(2010)
Fujifilm’s Energy Savings from the Electricity Grid in 1 Year
It takes 6.6 months of operation to offset the energy used to manufacture the turbine
NL
~18% of Fujifilm’s energy is from wind. The Dutch target for all renewable energy is 20% by 2020
3,161,340 m³ GAS
1,143 tons COAL
5 grams NUCLEAR
78,000 litres OIL
8,890GJ IMPORTED
Fujifilm Energy Mixture
Fujifilm is open about achieving sustainability targets 43GWh
(Cogeneration)
Tilburg is committed to 100% CO2 neutrality
CO2 by 2045. Fujifilm plans for 40% CO2 reduction
21GWh (Wind)
by 2012.
By 2010, Tilburg aimed for 10% sustainable energy. Fujifilm currently produces 15%-20% of its energy from wind
49GWh (Grid)
The Fujifilm windpark is leading the way toward implementing renewable energy in the mid-Brabant region, in cooperation with B.O.R.T.
Resources Needed for Wind Energy (21 GWh) Annual Employment Comparision of CO2 Emmisions (per 21 GWh) 27 million Kg
5,843 17 million Kg
1,075,851 kg
40,908 kg
1,596 kg
914,113 kg
WATER
FOSSIL FUELS
METALS
ROCKS & MINERALS
Wind
5 million Kg COAL FIRED
GAS FIRED
HYDRO
6 million Kg SOLAR
730
WIND
91.3
456 SOIL
0,0
WATER
SOLAR Electricity Grid (NL)
COAL
Electricity Grid (NL)
84
ENERGY & MATERIALS
820 million €
Electricity Grid (NL)
HAZARDOUS WASTE
(per year)
700 million €
625 jobs 2006
ECOSYSTEMS & SPECIES
550 million €
430 million €
Wind
181
BULK WASTE
0,11 FTE
WIND
Wind Energy Jobs & Turnover
Wind
SLAG ASHES
0,17 FTE
10,043
903
90
0,25 FTE GEOTHERMAL
12,782
819
46
0,72 FTE LANDFILL METHANE
AIR
Comparison of Atmospheric Impacts (per 21GWh)
1,145 924
0,87 FTE
3,195 1 million Kg
Comparision of Wastes From Wind and Electricity Grid (per 21GWh)
NUCLEAR WASTE
(FTE per GWh)
Human Toxicity Indicators (per 21GWh)
Jobs
850 jobs
2007
1150 jobs
1350 jobs Turnover
2008
CULTURE & ECONOMY HEALTH & HAPINESS
2009
319 91.3 GLOBAL WARMING
45.6 ACIDIFICATION
0.96
0.0 SMOG
0,01
OZONE DEPLETION
Integrated Sustainability Consulting & Design Creating the Foundation for a Sustainable Future
client: Eneco Sustainability assessment, communication and opening event of Fujifilm Windpark
6
client: Except / Innovationnetwork Polydome Sustainable Agriculture System 7
client: Gispen Plants / Innovationnetwork Redevelopment of Venlo Greenhouse park 8
client: City of Shanghai - Urban Masterplan
9
client: City of Shanghai - Urban Masterplan 10
client:
Revisioning of waste water industries and infrastructure 11
client:
Sustainable Multi-Purpose school Schiebroek 12
Keten Kippenvlees Alle waarden genormaliseerd tot het slachten van 1kg levende kip Electriciteit (0,74-1,32MJ)
Water (2,19L)
Warmte (0,13MJ)
Algemene Faciliteiten Electriciteit
Kratten Wassen
Energie (16,83MJ) Water (0.73L)
Water (0,12L)
Afvalwater Verwerking
Warm Water Ketel
Electriciteit (0,01MJ)
Electriciteit (0,02MJ)
Warmte (0,03MJ)
Warmte (0,1MJ)
Water (0,49L) Slib (0,05L) Verwarming
Verlichting
Ventilatie
Diervoeding Productie
Dagelijkse Schoonmaak
Voedsel (1,65kg)
Energie (3,46MJ)
Slachtlijn
Electriciteit (0,05MJ)
Panklaarlijn
Electriciteit (0,01MJ)
Koellijn
Electriciteit (0,001MJ)
Veeteelt
Electriciteit (0,15-0,23MJ)
Slachtproces
Transportband
Ophangen (Levend)
Water
Water Beneveling
Werkruimte Koelen
Bakken, Roken, Koken
Droge Lucht Koeling
Water (0,31L)
Brandstof (0,5MJ)
Warmte
Electriciteit (0,03MJ)
Water (0,05L)
Water (0,025L)
Electrisch Verdoven
Brandstof (1,5MJ)
Electriciteit (0,13-0,18MJ) Water (0,12L)
%
Water (0,78L)
Wassen
%
Water
40
5
Electriciteit (0,04–0,09MJ)
%
70
Transport
CO2 (8g)
Ontvangst %
Gemiddelde Kip (2kg)
Reinigings Middelen Water (0,038L)
Geïmporteerde Kip (11,7%)
Kadavers (>2,5g)
%
Broeibak
Doorsnijden Slagader Electriciteit (0,001MJ)
30
Vergassen
Onthoofding
Poten Verwijderen
Karkas Openen
Ingewanden Verwijderen
Afvalwater (0,038L)
Sproei Koeling
%
40
Snijden & Uitbenen
Gekoelde Opslag
Verpakken
Transport
15
Verwerking & bereiding
Foodservice
Retail
Gebruik
%
Bloed (30g)
Ophangen
5
Electriciteit
%
85
%
55
Inspectie
Ontveren (Mechanisch)
Electriciteit (0,3–0,7MJ)
Water (0,25L)
Afvalwater (23g)
Eetbare Organen (31g)
Poten (33g) Ingewanden (30g)
Kop (23g)
Reiniging Vrachtauto
%
55
Laatste Wasbeurt
Veren (37g)
Waterbad Koeling
Vet (60g)
Kadavers (22g)
Botten (94g) Nek / Nekvel (22g)
Bevroren Opslag Resten (5g)
Vuile Kratten
Bijproducten Overige (16g) Categorie 2
Kadavers (23g) Categorie 1
Rendac Verwerking
Categorie 3
Bloed Verwerking
Verenmeel Productie
Nertsen Fokkerijen
Food Grade
Diervoeding
Technisch Gebruik
Snack Industrie
Directe Consumptie (Menselijk)
Export naar China
Electricteit Opwekking (0,07MJ)
Veeteelt 42 dagen
Slachtlijn & Panklaarlijn 20 minuten
Koellijn 24-48 uur
Opslag 1-2 dagen
Retail & Gebruik (Vers) 0-12 dagen/ (Bevroren) 0-12 maanden
Except – Integrated Sustainability | Creative Commons 2011
13
client:
client:
Urban Ecosystem Development 14
client: World's largest ecological roof top park, on top of San Francisco's Transport Terminal. Completed in 2015.
15
client: Shrimp Farms BV
client:
Zero energy renovation of architecture faculty 16
client:
Inspiration book for energy neutral homes 17
Redevelopment of social housing neighborhood into energy neutral, water neutral, waste neutral, social programme and 80% food production.
client:
18
Systeemkaart Tapijt Sector: Visie 2030 Alle waarden op deze kaart zijn genormaliseerd naar 1 m2 geproduceerd tapijt in Nederland
X-SBR Latex (164g)
Natuurlijke vezel
Vuilstort Warmte (5,14MJ)
Huisvuil Verbranding
Cement (540g)
(Opwekking)
Electriciteit (2,17MJ)
Tuftdoek (100g)
Olie
Wol (1050g)
Bio-based
Katoen (900g)
Water (26,16L)
Afval (135,18mg)
Huidige Productie
Bio-PET (100g)
Electriciteit (16,14MJ)
Warmte (73,36MJ)
Warmte (16,88MJ)
CaCO3 (587g)
Afval (1915g)
Cementoven Verbranding (Opwekking)
Warmte (-80%)
Bio-PA 6.6 (775g)
PA 6.6 + PA 6 + PLA (540g)
Vezel (540g)
PET (100g)
Waterloze Backing
PP (700g)
Vruchtbare Grond (320g)
PA 6.6 (700g)
Vervezelen Warmte (+30%)
PLA (775g)
Warmte (afname)
Composteren
Opsmelten
Electriciteit (+50%)
Afval (+100%)
Flexibele Productie
Depolymeriseren
Water (-100%)
Afval (+100%)
Verven Naar Printen
PA 6 (775g)
Spuitgietmateriaal (540g)
Electriciteit (+150%)
Warmte (afname)
Electriciteit (afname) Water (sterke afname)
Afval (-90%)
Onderhoud & Reiniging
Sorteren & Scheiden
Electriciteit (40MJ)
Terugleveren Warmte (+30%)
Warmte (+200%)
Electriciteit (+50%)
Electriciteit (+50%)
Onderhoud & Reiniging Electriciteit 2015 (-25%)
Electriciteit (+150%MJ)
Electriciteit 2020 (-50%)
Electriciteit 2030 (-75%)
Restructuring of the Dutch Carpet Industry 19
20