Nationaal Studie Comité B3 Hoogspanningsstations
Topics:
1. 2. 3. 4. 5. 6.
Leden Studie Nationaal Comité B3 Actieve werkgroepen Brochures Tutorials Strategic plan B3 Thema dag B3 “Het onderstation de betrouwbare Hub” 7. Activiteiten nationaal comité 2013/2014 8. Opmerkingen
23 maart 2013
Thema dag Nationaal SC Cigré
Leden Studie Nationaal Comité B3 K.P. Knol ( voorzitter)
Liandon B.V.
F.L. Baldinger
Locamation Control Systems B.V.
H. Eleveld (secretaris)
KEMA CONSULTING
D. Boender
Stedin Netbeheer B.V.
T van Rijn
Alliander N.V.
A.J.P.M Geraerds
Essent Energie
E.C. (Bert) Wervers
TenneT
J.J.M. Langedijk
Siemens Nederland N.V.
M. van Meggelen
Alstom Grid Nederland
E de Meulemeester
KEMA CONSULTING
M.T. Rienks
TenneT
T.G. Spriensma
Eurovolt Consultancy BV.
S. J. Rotsteeg
ABB Energie B.V.
A. Visser
SBI Connectors Espana S.A
J.A. Wiersma
Stedin Netbeheer BV.
J.J Smit
TU Delft
23 maart 2013
Thema dag Nationaal SC Cigré
Actieve werkgroepen
B3.13 Reducing replacement time of HV Equipment
B3/C1/C2.14 Circuit Configuration Optimisation
B3.36 AC Collector Systems and Substations associated with HVDC connected Wind Powers Plants
B3.35 Substation earthing system design optimisation through the application of risk analysis
B3.25 SF6 analysis for AIS, GIS and MTS condition assessment
B3.29 Field test technology on UHV substation construction and operation
B3.30 Guide to minimize the use of SF6 during routine testing of electrical equipment
JWG B3/B1.27 Factors for investment decision GIL vs. Cables for AC Transmission
WG B3.24 Benefits of PD diagnosis on GIS
B3.23 Guidelines for uprating and upgrading
B3.34 Expected impact of future grid concept
of substations
on substation management
B3.31 Air insulated substations design for severe climate condition
B3.32 Saving through optimized maintenance of Air insulated Substations
B3.XX Internal arc effects in medium voltage switchgear
B3:36 Sidney Wijnbergen Piet Knol B3:32 Theo van Rijn B3:XX Yvette Peterman-Gunther
condition assessment
B1/B3.33
B3:34 Johan Smit
Feasability of a common dry type interface for GIS and Power cables of 52 kV and above
23 maart 2013
Thema dag Nationaal SC Cigré
Actieve werkgroepen Area 2 WG Nr. WG Nr. 1 B3.17 2 B3.25 3 B3.30
4 B3.29
B1.533 / B3. 33 B1.27/ 6 B3.27 7 B3.24 8 B3.37 9 Tutorial Area 2 10 meetings
2012
WG Title Title WG
2013
2014
JanFebMar AprMayJun Jul AugSep OctNovDecJanFebMar AprMayJun Jul AugSep OctNovDecJanFebMar AprMayJun Jul AugSep OctNovDec
Residual Life Aspects Applied to HV GIS Switchgear SF6 -analysis for AIS/GIS and MTS Condition Assessment Guide to minimize the use of SF 6 during routine testing of electrical equipment Field Tests Technology on UHV Substation during construction and operation Common dry type interfaces for GIS connections above 52 kV for Extruded AC cables Factors for investment decision GIL vs. Cables for AC Transmission Benefit for Partial Discharge diagnosis on GIS condition assessment
WG disbanded, Brochure No. 499 Brochure distributed for approval
Approval on publication
Internal arc defects in MV switchgears (1 – 52 kV) – mitigation technics Based on CIGRÈ brochure No. 499 residual life HV GIS
Tutorial available, see B3.17 1)
Legend WG-meeting
Area-meeting
Final meeting
Draft
Publication
1)
Next meeting in Berlin/ Germany 04/2014
Actieve werkgroepen Area 3
2013
2012
2014
1. 2.
Convener Jul 2.Secretary Secretary
WG Nr. WG Nr.
WG Title WG Title
1 B3.23
Guidelines for uprating and upgrading of substations
2 B3.31
Air insulated substations design for severe climate condition
1. Hiroshi Imagawa, Japan 2. Gilles Tremouille, France 1. Mark Mcvey, US 2. John Nixon, UK
3 B3.32
Saving trough optimized maintenance of Air insulated Substations
1. Hugh Cunningham, Ireland 2. Romain Migné, France
AprMayJun Jul AugSep Oct NovDecJanFebMar AprMayJun Jul AugSep OctNovDecJanFebMar AprMayJun Jul AugSep Oct NovDec JanFebMar AprMay OctNovDec Jun Jun OctNovDecJanFebMar OctNovDecJanFebMar Jun
2)
(WG has been disbanded)
4 5
Area 3 6 meetings
Legend WG-meeting
Area-meeting
Final meeting
Draft
Publication
1)
Next meeting in Berlin/ Germany 04/2014
AA4 B3.06.01 “Maintenance and organisation”-contracting • Part of overview paper at Brisbane B3/D1 Colloquium • “Integrated Substation Life management and Asset Information Strategy”
• A guide is finalized, however now waits for completion with two or more sample contracts to make it a TB • “Practical Guide for the Outsourcing of Asset Management Services”
Study Committee B3
Progress of work AA4
7 | xx
AA4 • B3.06.05 “Practical application of AM information strategies”, convener S. Läderach (CH) • Part of overview paper at Brisbane B3/D1 Colloquium • “Integrated Substation Life management and Asset Information Strategy”
• TB submitted to SC, • “Practical application of asset management information strategies”
• Closing TF5
Study Committee B3
Progress of work AA4
8 | xx
Actieve werkgroepen
23 maart 2013
Thema dag Nationaal SC Cigré
AA4 • B3.34 Expected impact of future grid concept on substation mgt • future grid impact on substation subsystem and component management • practical feasibility including reliability/availability • Evaluate technical, economical and environmental aspects • identify implications and requirements on e.g. ratings, functionality, location • impact of providing future grid intelligence, requirements on ICT
• Members from 15 countries, internationally well distributed • Part of overview paper at Brisbane B3/D1 Colloquium • “Integrated Substation Life management and Asset Information Strategy”
• EPRI document on grid transformation serves as guide • Members appointed to write sections • The survey is ready for processing
Study Committee B3
Progress of work AA4
10 | xx
Tutorials Studie Comité B3 1. Residual life aspects on GIS
(Peter Glaubitz, WG B3.17)
2. Upgrading and uprating of substations (Akira Okada, WG 3.23) 3. Obtaining value from on-line monitoring
(Arthur Mackrell, WG B3.12)
4. Standardisation vs. innovation in substation design (Terry Krieg, B3.11) 5. Application Guidelines for Turn-Key Projects 6. Circuit Configuration Optimization
(Akira Okada, Gilles Tremouille)
(Gerd Lingner)
7. Responsible Use of SF6- Challenges and Options 8. High Voltage Off Shore substations
(Peter Glaubitz)
(John Finn, WG B3:26)
9. Special Considerations for AC Collector Systems and Substations associated with HVDC connected Wind Power (Douglas Ramsay B3:36)
Study Committee B3
Progress of work AA4
11 | xx
Brochures Studie Comité B3 B3.11 B3.12 B3.15 B3.10 B3.17 B3.20 B3.18 B3.21 B3.22 B3.23 B3.26
B3.29 B3.25
Combining Innovation with Standardisation Obtaining value from Substation Condition Monitoring Cost Reductions of Air Insulated Substations Primary /Secondary system interface modelling for total asset performance optimization Residual Life Concepts Applied to HV GIS Mixed Technologies Switchgear MTS SF6 Tightness Guide Turnkey Substations Tech. requirements for substations exceeding 800kV Guidelines for uprating and upgrading of substations Guidelines For The Design And Construction Of AC Offshore Substations For Wind Farms
389 462 354 472 499 390 430 439 400 532 483
Field Tests for UHV Substations (with CIGRE) SF6 Analysis for AIS, GIS and MTS Condition Assessment
B3-C1-C2.14 Circuit Configuration Optimisation (JWG) B3.06
IT Strategies for AM of Substations-General principles
Study Committee B3
Progress of work AA4
12 | xx
SC B3 and SC D1 Colloquium Brisbane Australia 9-11 September 2013 © Cigre Australia
Slide 13
International Situation on SF6 Regional Issues Peter Glaubitz SC B3 AA2 GIS, GIL, SF6 September 11, 2013
[email protected]
Greenhouse Gases Emissions from greenhouse gases* in [%]
Kyoto target, worldwide (issue 1997): Reduction of greenhouse gas emissions by 5.2% in the period 2008-2012*
EU
-8
Luxembourg Denmark Germany
Kyoto target, Europe (issue 1997): Reduction of greenhouse gas emissions in the EU by 20% in the period 2013-2020** and 80-95% until 2050
Austria United Kingdom Belgium Italy
Reduction
Netherlands Finland France
Kyoto target extended to 2020 (“provisional”) Next (19th) Conference of the Parties (COP) in Warsaw/ Poland in 2013 Till 2015 (21st) COP decision about targets starting 2020 * 28 substances including SF6
Increase
Sweden Ireland Spain
Greece Portugal
** Based on the emission level of 1990
Study Committee B3
Progress of work AA4
14 | xx
0,9 0.9
350000
0,8 0.8
300000
0,7 0.7 0,6 0.6
250000
0,5 0.5
200000
0.4 0,4 150000
0.3 0,3
100000
03
04
Study Committee B3
05
06 Purchase
07
08 Year Emission
09
10
11
505
375
665
1044
659
591
0
655
2144
1655
50000
0,2 0.2
Emission rate (%)
400000
1661
SF6 banked (kg)
Switzerland SF6 bank and emission
0.15%
0.1 0,1 0.0 0,0
12
Emission rateof work AA4 Progress
15 | xx
Source: SF6 balance of SwissMEM
France SF6 bank and emission (2) 2,0%
500
400
128
129
132
132
1,5%
127
124
1.1%
300
1,0% 0.8%
200 324
323
2007
2008
358
364
383
380
0,5%
Emission rate
Installed amount of SF6 (t)
600
100
0
0,0% GIS
2009 Circuit Breakers
2010 GIS
2011 Circuit Breakers
2012
Source: SF6 balance of the French TSO Study Committee B3
Progress of work AA4
16 | xx
Japan SF6 bank and emission (2)
Emission rate (%)
SF6 storage in field, Emission (ton)
SF6 Gas Emission during operating stage in Electrical industry (Japan)
0.17%
Study Committee B3
Progress of work AA4
17 | xx
Quoted from METI data concernig SF6 Gas emission in Electrical Industry in 2012
Strategic plan B3
Review processes: • Strategic Plan 2005 - 2014 • Annually reviewed by SAG, last formal revision in 2009 • SC members invited to identify issues in February 2013 • SAG final review in April 2013 Introduction to revisions: • Introduction of grid UHV AC and DC for substation design • Smart Grids and increased grid automation impacts • Higher awareness of risk of ownership, issues. • New Materials and technologies • On-going issues with existing assets: uprating, extensions 23 maart 2013
Thema dag Nationaal SC Cigré
Strategic plan B3
New Technical Directions: • • • •
Impact of new materials & plant technologies UHV experience – operations and design Safety, security, risk and environment Constructability and maintainability, economic aspects
New Organisational Directions: • • • • • • •
Maximising international profile, venue selection for meetings Maximise Distribution involvement in WG Maximise use and features of SC B3 website Increasing communication opportunities using new technologies Two green book projects: Substations and Guidebook to SF6 Using the two Green book projects to identify missing study areas. Enhancing the business value of CIGRE for customers go 23 maart 2013
Thema dag Nationaal SC Cigré
Thema dag B3 “Het onderstation de betrouwbare Hub”
23 maart 2013
Thema dag Nationaal SC Cigré
Thema dag B3 “Het onderstation de betrouwbare Hub” 5
10
15
20
25
30
162
TenneT / Alliander / Enexis / Stedin / DNWB / WEI / Netbeheer NL
Netbeheerders
29
ABB / Alstom / Siemens / Hapam / Eaton / Elspec / SBI / ELEQ / MetaCom-SBC / VSL / Jazo
Leveranciers
26
Joulz / Liandon / Spie / Cofely / Cegelec / BAM /
Service Providers
26
DNV Kema/ Eurovolt/ Ensol/ Movares/ HaskoningDHV/ Fluor/ Ecofy /D-Cision/ TNO/ Mott MacDonald/ Jacobs/ Arcadis/ ReimElekt
Ingenieurs-/adviesbureau's
26
Essent Energie Prod/ ProRail / NEN / Cigré /
Diversen
10
Haagsche Hogeschool (Power Minor)
19
TU Delft / studenten
13
TU Delft / Eindhoven
13
5
10
23 maart 2013
15
20
25
Thema dag Nationaal SC Cigré
30
Thema dag B3 “Het onderstation de betrouwbare Hub” Top dag. ik zou zeggen ga maar lekker mee door. Goede locatie, goede verzorging en prima tijdstip. Duidelijke en bondige presentaties. Locatie, gekozen sprekers, gekozen onderwerpen, voedsel Strak programma met interessante onderwerpen en sprekers. Programma van een middag. Lunch en diner uitstekend. Locatie hoogspanningslab perfect; collegazaal iets minder confortabel. Inhoud en opzet van de presentaties prima. De combinatie van lezingen, demonstratie gelegenheid om elkaar te ontmoeten. Het bij elkaar zetten van een aantal producenten van HS componenten -Duur presentaties (3x 25 min presentaties achter elkaar) -Mogelijkheid om als deelnemer vragen te mogen stellen (met microfoon) -Lunch/avondeten Als ontwerper van MS netten zeker bruikbare raakvlakken
23 maart 2013
Thema dag Nationaal SC Cigré
Thema dag B3 “Het onderstation de betrouwbare Hub” Powerpoint presentatie korter kunnen. "Graag zou ik de presentaties bij aanvang lezing digitaal of op papier beschikbaar willen. PDF voldoet Vragen via de microfoon is wat traag. Misschien gewoon vraag stellen zonder Meer ruimte voor vragen en discussie met de zaal. Teveel presentaties in het programma, waardoor iets teveel uitloop. De presentaties waren in het algemeen erg oppervlakkig. Meer diepgang is m.i. gewenst. Voorstellen voor toekomstvaste concepten (30 jaar) aangaande E-infra's en de daarop af te stemmmen inrichtingen / configuraties van onderstations. "Ik miste technische diepgang in de onderwerpen. Veel van de onderwerpen zijn z.g. open deuren, Ik miste echte oplossingen of een path foreward om problemen aan te pakken. De gedachte achter CIGRE is het uitwisselen van kennis om samen tot een hoger niveau te komen.
23 maart 2013
Thema dag Nationaal SC Cigré
Activiteiten nationaal comité 2013/2014 • SAC/CAG/TAG Meeting 7 t/m 9 may 2014 Holland evt. Workshop//Tutorial
• • • •
Voorbereidingsdag // Evaluatie dag Paris session Participanten comités // commitment management Certificaten workshops Cigre promotie => industrie
Opmerkingen
23 maart 2013
Thema dag Nationaal SC Cigré