1. CURRENT ENERGY CONDITION
ESDM for people welfare
National Energy Mix Total (2011) 2011) 1176 million BOE
The utilization of renewable energy is still low; The average of growth rate of energy consumption is 7% per year ;
NRE 5.03%
Natural Gas 24.29%
High dependence on fossil energy;
The average of growth rate of electricity demand is 9.2 % per year; Coal 23.91%
Public access to energy (modern) is still limited: Electrification ratio of year 2012 is 76,56 % (23,46 % of households not yet electrified);
Crude Oil 46.77%
Less of development of energy infrastructure particularly in rural / remote areas and outer islands. Linkage to environmental issues:
Elasticity of Energy = 1,65 Share of Non Fossil Energy ≈ 5%
Mitigation of climate change; National commitment to reducing emissions 26% by 2020.
ESDM for people welfare
RATIO OF ELECTRIFICATION until 2012 Category : NAD 87,72%
> 60 % Sumut 83,98% Riau 78.17%
Kepri 91,52%
Kalteng 67,28%
Sumbar 77,72%
Lampung 70,40%
Banten 68,18% Jabar 70,72%
Electrification Ratio
Jateng 77,31%
Kalsel 75,65%
DIY 75,19%
Bali 69,77%
Jatim 72,05%
Maluku 70,80%
Sulsel 74,18%
NTB 52,88%
Papua 29,25%
NTT 39,92%
Year 1980
1985
1990
1995
2000
2005
2006
8%
16%
28%
43%
53%
62%
63% 64,34%
ESDM for people welfare
Malut 70,34%
Sulteng 64,84% Sultra 54,46%
Jakarta 99,99%
Bengkulu 71,15%
20 - 40 %
Papua Barat 58,24%
Sulbar 64,12% Babel 82,26%
Jambi 76,54%
Sulut 73,21%
Gorontalo 54,69%
Kalbar 65,37% Sumsel 72,71%
41 - 60 %
Kaltim 63,44%
2007
2008
2009
65,10% 65,79%
2010
2011
67,15%
72,95%
2012
76,56
2. NATIONAL ENERGY POLICY
ESDM for people welfare
NATIONAL ENERGY DIRECTION
PERATURAN PRESIDEN 5/2006
BAU EBT 3%
EBT 5.03%
Gas 21%
Batubara 23.91%
EBT Lain Liquified Coal Bioenergi 8,9% 5% 3%
Minyak Bumi 20%
Minyak Bumi 42%
Gas 24.29%
Gas 30%
Batubara 34%
Minyak Bumi 46.77%
Bioenergi 5% Panas Bumi 5%
3298 Juta SBM
Batubara 33%
3200 Juta SBM
17%
20,6%
47,%
2011
32% Batubara
KONSERVASI ENERGI (15.6%)
25 % EBT 32% Batubara
30%
20% Gas
20%
23% Minyak Bumi
41.7%
24,%
Note: 1 TOE = 7,33 SBM
20% Gas
33%
5,0 % 24 %
Gas Minyak Bumi
25% EBT
2015
ESDM for people welfare
2020 2025
DIVERSIFIKASI ENERGI
1649 Juta SBM
1176 Juta SBM
EBT Batubara
34.6%
23% Minyak Bumi
2785 Juta SBM
3,1% 2419 Juta SBM
VISI 25/25
ENERGY POLICY PERATURAN PRESIDEN 5/2006
Bioenergi 5%
EBT 17%
Gas 30%
VISI 25/25 Bioenergi 8,9% EBT 25%
Minyak Bumi 20%
Gas 20%
Batubara 33%
Minyak Bumi 23%
Batubara 32%
1.
KONSERVASI ENERGI untuk meningkatkan efisiensi penggunaan energi di sisi suplai dan pemanfaatan (Demand Side), antara lain sektor industri, transportasi, rumah tangga, dan komersial.
2.
DIVERSIFIKASI ENERGI untuk meningkatkan pangsa energi baru terbarukan dalam bauran energi nasional (Supply Side), antara lain Energi Baru
Energi Terbarukan
a. b. c. d. e. f.
a. b.
Panas Bumi, Aliran dan Terjunan Air (Hidro),
c.
Bioenergi,
d. e. f.
Sinar Matahari, Angin, Gerakan dan Perbedaan Suhu Lapisan Laut.
Batubara Tercairkan (Liqiufied Coal) Gas Metana Batubara (Coal Bed Methane) Batubara Tergaskan (Gasified Coal) Nuklir Hidrogen Metana yang lain
ESDM for people welfare
SECTORAL ENERGY POLICY
Master Plan for National Energy Conservation (RIKEN)
Energy Policy of Commercial Buildings Sector Energy Policy of Industrial Sector
demand side
Energy Policy of Household Sector
Energy Policy of Transportation Sector
Vision New Renewable Energy 25/25
CLUSTERAL ENERGY POLICY*) Non Renewable Energy
Master Plan for Energy Conventional/ Fossils
Energy Policy of Oil Cluster Energy Policy of Gas Cluster Energy Policy of Coal Cluster
New Energy Energy Policy of Nuclear Cluster Energy Policy of CBM Cluster
Energy Policy of Liquified Coal Cluster Energy Policy of Hydrogen Cluster
Renewable Energy
Master Plan for National Energy Diversification (RIDEN)
Energy Policy of Geothermal Cluster Energy Policy of Hydro Cluster Energy Policy of Bioenergy Cluster Energy Policy of Solar Energy Cluster
*) Cluster in accordance with Law 30/2007 on Energy
ESDM for people welfare
Energy Policy of Wind Energy Cluster Energy Policy of Ocean Cluster
supply side
Energy Policy of Gasified Coal Cluster
3. POTENCY AND DEVELOPMENT PROGRAM OF BIOENERGY
ESDM for people welfare
Indonesia as an archipelago consist of 17.000 islands (big and small islands). As
an archipelago, many of areas can not reached by national grid; or difficult to reached by modern energy; Bioenergy potential (agriculture waste, animal waste, municipal solid waste, biomass) is available throught Indonesia that prospective to be developed for both electricity and non electricity to fulfill the people’s energy demand; Many bioenergy technology has proven. Most of power plant are fossil based power plants which is release greenhouse gases emission; Climate change has been a global issue – the more use of bionergy, the more emission reduction can be achieved. The Government of Indonesia commit to reduce the National Greenhouse gases It’s time to move from fossil energy to renewable energy especially bioenergy; ESDM for people welfare
12
POTENCY OF BIOENERGY RESOURCES IN INDONESIA BIOFUELS • CPO production 21 million ton, another : Jatropha, Kemiri Sunan, & Nyamplung that can be used a raw material for Bioediesel (where the 2013 target about 30 million ton); • Molasses 1,5 million ton, cassava, 14 milliom ton, Sorghum, Nipah, Aren, & Sagu that can be use as raw material for Bioethanol. BIOGAS • Potency for biogas in Indonesia was dominated from waste fom cow dung and oraganic materials • Indonesia has potency of 16,6 million of cow, approximately 28,7 million of goat and sheep, and around 7,7 million of pigs (2011) • High potenncy of Palm Oil Mill Effluent (POME), 50 % from FFB is liquid waste which content 50-70% of of CH4 taht can be use as small biogas digester or Biogas Power Plant. BIO BRIKET • Potency of agriculture and plantation waste is big that be used as bio-briket BIOMASS- ELECTRICITY • One of the byproduct of Palm Mill is Solid waste such as oil palm shell, fiber and EFB that can be use as fuel for Biomass Power Plant • Another Biomass waste that can be use as fuel are: municipial solid waste, baggass, rice husk, sawdust and wood • Potency of Electricy generated from Biomass waste from Palm mill factory is around 500MW, bagasse 300MW,& municipial waste 1.070 MW.
ESDM for people welfare
25 POMs 980 ton FFB/Hour
92 POMs 3815 ton FFB/Hour 140 POMs 6660 ton FFB/Hour
26 POMs 1645 ton FFB/Hour
1 POMs 40 ton FFB/Hour
29 POMs 1545 ton FFB/Hour
42 POMs 2245 ton FFB/Hour
65 POMs 5475 ton FFB/Hour
7 POMs 590 ton FFB/Hour
4 POMs 360 ton FFB/Hour
6 POMs 260 ton FFB/Hour
3 POMs 140 TPH
16 POMs 1235 ton FFB/Hour 58 POMs 3555 ton FFB/Hour
19 POMs 990 ton FFB/Hour 10 POMs 375 ton FFB/Hour 1 POMs 60 ton FFB/Hour
3 POMs 260 ton FFB/Hour
43 POMs 3100 ton FFB/Hour 1 POMs 30 ton FFB/Hour
ESDM for people welfare
15 POMs 770 ton FFB/Hour
2 POMs 150 ton FFB/Hour
14
Source : BPS (Badan Pusat Statistik) Indonesia and Ministry of Agriculture 2009
Sumber : data diolah dari BPS dan Kemtan
Implementation of Bioenergy Program 1. DEVELOPMENT OF BIOFUEL (BIODIESEL & BIOETHANOL) as SUBTITUTE FOR GASOLINE
There are 23 manufacturers of biodiesel and 7 bioethanol producers with commercially licensed Installed capacity of biodiesel is 4.8 million KL / year and bioethanol installed capacity is 365,000 KL / year. Utilization of biofuels in the transport sector (7.5% biofuel blend in gasoline , by 2% non-PSO on fuel), industrial sector (particularly in the mineral and coal mining industries), and the power generation sector 2. HOUSE HOLD BIOGAS PROGRAM Implemented through the government budget with energy self-sufficient village program, through private investment, and a semi-commercial basis through the National Domestic Biogas Programme / Home Biogas Program. The program is implemented by HIVOS, a Dutch NGO and funded by the Dutch Government. Status until april 30, 2013, total biogas digesters have been built as many as 8740 units of the total target of 10,000 units at the end of 2013. 3. BIOENERGY BASE POWER PLANT PROGRAM • Total installed capacity of bioenergy based power plants such as biomass, biogas, municipal solid waste which is connected to the grid through the month of February 2013 amounted to 75.5 MW 4. SELF SUFFICIENT ENERGY VILLAGE PROGRAM • Use of bioenergy development for the villages especially in remote areas that have not gain energy access. DME Bioenergy development is intended to allow a village in districts to meet its own energy needs of local energy sources.
ESDM for people welfare
1.Energy Security • Improve the NRE energy accesibility • Reduce the use of fossil energy.. • Reduce dependence on imported fuel. • Diversification of energy sources • Maintain the sustainability of energy reserves
2.Economic impact • Job creation and enterprenuer development. • To increasei the incestment in industries.. • Increase economic development through manufacturing products and components, assembly and installation, operation and / or service equipment.
ESDM for people welfare
3. Environment Impact: • Reduction of greenhouse gas emission. • Reduction in air pollution levels. • Easily biodegradable (biodegradable). Improve air quality and improve public health and public welfare
BIOENERGY SECTOR
BIOENERGY CONVERSION INSTALLATION Bio-Refinery
Raw Materials/ Feedstock
BioGassification BioBriquettes BioCook Stove
Integrated Generator
Distribution
Biofuel Oil
Distribution
Biofuel Gas
Distribution
Biofuel Solid
Gas
Solid
Biomass- Electromagnetic Electricity (Green Electricity)
(1) Bioenergy products consist of: (2) Biofuels in point 1.1. consist of: 1. Bio Fuel (Green Fuels) 1. Liquid Biofuel / Green Gasoline 2. Biomass-Electricity (Green Electricity) 2. Gas Biofuel, or Gas Plant / Green Gas 3. Solid Biofuel, or Bio-Briquette
ESDM for people welfare
Liquid
4. BIOGAS & BIOMASS POLICIES
ESDM for people welfare
BIOMASSA, BIO GAS AND MUNICIPIAL SOLIDWASTE (MSW)
INDEPENDENT POWER PRODUCERS (IPP) INDEPENDENT BIOEFUEL PRODUCERS
ELECTRICITY & BIOFUEL
MINI GRID/MINI PRODUCERSS OFF GRID/PILOT PROJECTS
Pola 1 : INDEPENDENT POWER PRODUCERS/ INDEPENDENT BIOEFUEL PRODUCERS electiricity producers that sells electricity to PLN / Biofuel Producers sells ele Pola 2 : MINI PRODUCERS/MINI GRID electiricity producers that sells electricity through decentralized distributions Pola 3 : PILOT PROJECTS Government/non Government organization/entity that build power plant and donate it’s assets to another organization/community : Self Sufficient Energy Village (DME)
ESDM for people welfare
19
LAW NO 30 TAHUN 2007 CONCERNING ENERGY LAW NO 30 YEAR 2009 CONCERNING ELECTICITY GOVERNMENT REGULATION NO 14 YEAR 2012 CONCERNING ACTIVITIES OF POWER SUPPLY PRESIDENT REGULATION NO. 5 YEAR 2006 ON NATIONAL ENERGY POLICY MINISTER of Energy Regulation No. 32 of 2008 CONCERNING THE PROVISION, USE, AND PROCEDURES FOR COMMERCIAL VEGETABLE FUEL (BIOFUELS) AS OTHER FUELS MINISTE OF ENERGY AND MINERAL RESOURCES REGULATION NO. 4 YEAR 2012 on the Purchase Price of Electricity by PT PLN (Persero) from the Power Plant That Uses Renewable Energy In Small and Medium Scale or Excess Power. MINISTRY OF FINANCE REGULATION NUMBER 21/PMK.011/2010 Regulation of tax and customs facility for renewable energy resources utilization activities . MINISTRY OF FINANCE REGULATION NUMBER 130/PMK.011/2011 CONCERNING ON PROVISION OF EXEMPTION FACILITIES OR REDUCTION OF INCOME TAX
ESDM for people welfare
1) Law No. 30 year 2007 on Energy
> Provision and utilization shall be increased by the Government and local government > Given incentives and facilities Government Regulation No. 14 Year 2012 on Electricity Supply Enterprises 2) Law No.30 year 2009 on Electricity 3) Government Regulation No. 14 Year 2012 on Electricity Supply Enterprises > No Need Tender Mechanism > Appointments can be made directly ESDM for people welfare
21
MINISTRY OF ENERGY AND MINERAL RESOURCES NUMBER 4 YEAR 2012 Concerning On Electricity Price Purchased by PT. PLN from Small Scale and Medium Scale Renewable Energy Electricity Generation or Excess Power No.
Energy
Capacity
Tariff
information
Medium Voltage 1.
Biomassa
s.d 10 MW
Rp. 975,- / kWh X F
2.
Biogas
s.d 10 MW
Rp. 975,- / kWh X F
3.
Sampah Kota (MSW)
s.d 10 MW
Rp. 1050,- / kWh
Zero waste *) MSW
4.
Sampah Kota (MSW)
s.d 10 MW
Rp. 850,- / kWh
Landfill *) MSW
Low Voltage 1
Biomassa
s.d 10 MW
Rp. 1.325,- / kWh X F
2
Biogas
s.d 10 MW
Rp. 1.325,- / kWh X F
3
Sampah Kota (MSW)
s.d 10 MW
Rp. 1.398,- / kWh
Zero waste *) MSW
4
Sampah Kota (MSW)
s.d 10 MW
Rp. 1.198,- / kWh
Landfill *) MSW
F is incentive factor based on the region where the power plant installed, as follows: Jawa, Bali, and Sumatera region :F=1 Kalimantan, Sulawesi , NTB and NTT region : F = 1,2 Maluku and Papua region : F = 1,3 *Based on Law No. 18 Year 2008 concerning to Waste Management. - For municipal solid waste, tipping fee applied at minimum Rp. 100.000, - / ton of waste (tipping fee is fee given by local government to waste management institution).
ESDM for people welfare
1. 2. 3. 4. 5. 6. 7.
Giving priority for locally available renewable energy resources (no need for tender) Mandatory for electric utility to purchase electricity generated from renewable energy Regulated Purchasing Price (Feed-in Tariff) Tax investment credit for electricity generated from renewable energy (currently applies for geothermal) Reduced or exempted custom tax for renewable energy technologies Simple permit procedure Support from the government for selected FS
ESDM for people welfare
23
FINANCIAL INSTRUMENTS SUPPORT FOR BIOENERGY DEVELOPMENT FINANCIAL INSTRUMENTS SUPPORT *)
Income Tax
• Reduced net income for 30% of total investment • accelerated depreciation • Imposition of Income Tax on dividend paid to Foreign Taxable at 10% • compensation for losses in certain circumstances
Value Added Tax
Exemptions of VAT for Taxable Goods, machinery and equipment for RE utilization (not included spare parts)
ESDM for people welfare
Import Duty
Exemptions for Import Duty of Goods and Machinery for development and capital investment Capital Goods Imports for construction and development of electricity industry
Tax Borne by Government
Regulated in State Annual Budget Law and its implementing regulations
CORPORATE TAXPAYERS
can get facilities:
• PIONEER INDUSTRIES • Having a new investment plan min. IDR 1 trillion • Placing funds in the Indonesian banking min 10% from the total capital investment plan • Existed as ENTITY INDONESIA
EXEMPTION OR REDUCTION OF CORPORATE INCOME TAX EXEMPTION OF CORPORATE INCOME TAX 5 - 10 tax year
After the end of Corporate Income Tax exemption facility
• Industry of Basic Metals Manufacutre • Industry of Oil Refining and / or Basic Organic Chemicals sourced from Oil and Natural Gas • Industry of Machinery
REDUCTION OF CORPORATE INCOME TAX
• INDUSTRY OF RENEWABLE RESOURCES FIELD
50% of Income Tax Payable for 2 tax yearh
• Industry of Communications Equipment Minister of Finance may provide facilities Corporate Income Tax exemption or reduction for a period EXCEED predetermined period of time *)
PIONEER INDUSTRIES
The facility can be utilized if: 1. Had executed the entire capital investment 2. Has been produced commercially
ESDM for people welfare
25
5. IMPLENTATION OF BIOGAS AND BIOMASS
ESDM for people welfare
ACCHIEVEMENT OF BIOENERGY IN YEAR 2012 SASARAN STRATEGIS
INDIKATOR SASARAN
REALISASI
TINGKAT CAPAIAN
Meningkatnya kemampuan
Jumlahproduksi
pasokan energi untuk domestik
-
Bioethanol (Kilo Liter)
0
0%
-
Biodiesel (Kilo Liter))
700.000
77,77 %
-
Biogas (M3)
9.305 10
93,05 % 157,14
52
104 %
Kapasitas terpasang Total PLT
21
210%
Biomassa (MW)
7,5
100%
Meningkatnya pembangunan
Jumlah lokasi pembangunan infrastruktur
infrastruktur energy
bidang Digester Biogas (Lokasi)
Terwujudnya peningkatan peran Jumlah Desa Mandiri Energi sub sektor EBTKE dalam
(DME) berbasis Bahan
pembangunan daerah
Bakar Nabati dan non Bahan Bakar Nabati
Meningkatnya pengembangan berbagai sumber energi dalam rangka diversifikasi energi
-
- Persentase Pemanfaatan BBN pada BBM Transportasi (%)
ESDM for people welfare
DEVELOPMENT PROGRAM OF BIOENERGI BASED ELECTRICITY (BIOMASS, BIOGAS AND MUNICIPAL SOLID WASTE POWER GENERATION) “ON-GRID” YEAR 2012-2014 Total capacity existing Bioenergy Based Electricity “on-grid” year
2012 : 75,5 MW Planning of development Bioenergy Based Power Generation 2013 “on-grid” until end 2013 : 58,2 MW Planning of development Bioenergy Based Power Generation 2013 “on-grid” until end 2014 : 90 MW
ESDM for people welfare
EBTKE KESDM - 2013
KAPASITAS TERPASANG “on-grid” PEMBANGKIT TENAGA LISTRIK BERBASIS BIOMASA, BIOGAS & SAMPAH KOTA s.d TAHUN 2012 No
Nama Perusahaan
COD
Jenis kontrak
Lokasi
PLN Wilayah
Kapasitas Jenis biomasa Kontrak (MW) palm waste 5
1
PT Riau Prima Energy
2001 Excess power
Riau
PLN Wilayah Riau
2
PT Listrindo Kencana
2006 IPP
Bangka
PLN Wilayah Bangka
Palm waste
5
3
PT Growth Sumatra
2006 Excess power
Sumatera Utara
PLN Wilayah Sumut
Palm waste
6
4
2006 Excess power
Riau
PLN Wilayah Riau
palm waste
2
7 8
PT Indah Kiat Pulp & Paper PT Belitung Energy PT Growth Sumatra
2010 IPP 2010 Excess power
Belitung Sumatera Utara
PLN Wilayah Babel PLN Wilayah Sumut
Palm waste Palm waste
7 9
9
PT Pelita Agung
2010 Excess power
Riau
PLN Wilayah Riau
Palm waste
5
10
Permata Hijau Sawit
2010 Excess power
Riau
PLN Wilayah Riau
Palm waste
2
11 12 13
PT Navigat Organic PT Navigat Organic PT Growth Asia
2011 IPP 2011 IPP 2011 Excess power
Bali Bekasi Sumatera Utara
PLN Dist Bali PLN Dist Jabar PLN Wilayah Sumut
MSW MSW Palm waste
2 6 10
14
PT Growth Asia
2012 Excess power
Sumatera Utara
PLN Wilayah Sumut
Palm waste
10
15
PT Navigat Organic
2012 IPP
Bekasi
PLN Dist Jabar
MSW
6,5
TOTAL KAPASITAS “ONGRID”
ESDM for people welfare
75,5 EBTKE KESDM - 2013
RENCANA PENGEMBANGAN “on-grid” PEMBANGKIT TENAGA LISTRIK BERBASIS BIOMASA, BIOGAS & SAMPAH KOTA di TAHUN 2013 No Nama Pengembang 1 2
Navigat Organic Growth Steel Group
COD 2013 2013
3
Growth Steel Group
2013
4
Growth Steel Group
2013
5 6 7 8 9
Growth Steel Group PT Nubika Jaya PT. Austindo Aufwind PT. Bioenergi Hijau PT. Canang Indah
10 PT Victorindo
2013 2013 2013 2013 2013 2013
Jenis Lokasi kontrak IPP Bantar Gebang, Bekasi Excess Simalungun, power Sumut Excess Jambi power Excess power Excess power Excess power IPP IPP Excess power Excess power
Bekasi
PLN Dist Jabar
Jenis Biomassa Kapasitas MSW (sampah)
Status
2 Konstruksi
PLN Wilayah Sumut PLN Wilayah Sumsel
Palm waste ( limbah sawit) Palm waste
10
PLN DisJabar
rice husk
10
10
Konstruksi Konstruksi dan PPA Negosiasi Konstruksi
Pontianak Sumatera Utara Belitung Probolinggo Medan Sumatera Utara
TOTAL KAPASITAS “On Grid”
ESDM for people welfare
PPA Kontrak
PLN Wilayah Kalbar PLN Wilayah Sumut PLN Babel
PLN Wilayah Sumut PLN Wilayah Sumut
Palm waste
10 Konstruksi
Palm waste
6 Konstruksi
POME Kotoran Sapi Palm waste Palm waste
1,2 1 3 5
Konstruksi Konstruksi Konstruksi PPA dengan PLN Wilayah Sumut
58,2
EBTKE KESDM - 2013
RENCANA PENGEMBANGAN “on-grid” PEMBANGKIT TENAGA LISTRIK BERBASIS BIOMASA, BIOGAS & SAMPAH KOTA di TAHUN 2014 No
Nama Pengembang
COD
Jenis kontrak
Lokasi
PPA Kontrak
Jenis Biomassa
Kapasitas
Status
Riau
PLN Wil Riau
POME
8
PLN Wil Riau
Palm waste
10
PPA dan Administrasi PPA dan Administrasi PPA dan Administrasi PPA dan Administrasi PPA dan Administrasi PPA dan Administrasi PPA dan Administrasi
1
PTPN 5
2014 Excess power
2
Growth Steel Group
2014 Excess power Pekan Baru Unit 1
3
Growth Steel Group
2014 Excess power Palembang unit 1
4
Palm waste
10
Growth Steel Group
PLN Wil Sumsel Jambi Bengkulu 2014 Excess power Simalungun, Sumut PLN Wilayah Sumut
Palm waste
10
5
Growth Steel Group
2014 Excess power
Jambi
PLN Wilayah Sumsel
Palm waste
10
6
Growth Steel Group
2014 Excess power
Bekasi
PLN DisJabar
rice husk
10
7
Growth Steel Group
2014 Excess power
Pontianak
PLN Wilayah Kalbar
Palm waste
10
8
PT.Maluku Biomass
2014
9 10
PT. Global Green Lestari Private
IPP
Maluku
2014
IPP
Bengkulu
2014
IPP
Gorontalo
11
Private
2014
IPP
Sumut
12
Green Energy Specialist
2014
IPP
Aceh, Langsa
Maluku dan Maluku wood chip Utara PLN Wil Sumsel Palm waste Jambi Bengkulu PLN Wilayah Corn Cob Gorontalo PLN Sumut Biogas POME PLN Wilayah Aceh
Biogass POME
2 6
Proposal PPA dan Administrasi
10 1
Proposal PPA dan Administrasi
3 Planning
TOTAL KAPASITAS on Grid
ESDM for people welfare
90
6. CLOSING REMARKS ESDM for people welfare
Indonesia is the right place to develop business of bioenergy based
power plant due to the availability of huge of bioenergy potential and high growth demand of electricity. Bioenergy is a clean energy, carbon neutral and renewable Government has issued some regulations to make the bioenergy business more conducive. Government will continue to up date or revise the regulations to attract the investors to come. It’s time to move from fossil energy to renewable energy particularly Bioenergy. Indonesia welcome discussion, investment, and research in bioenergy sector ESDM for people welfare
33
TERIMA KASIH
Go Green Indonesia ! energi hijau, energi masa depan
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
DIREKTORAT JENDERAL ENERGI BARU, TERBARUKAN, DAN KONSERVASI ENERGI
ESDM for people welfare www.ebtke.esdm.go.id
www.esdm.go.id
ESDM for people welfare