ERTMS Deployment on the IVth Pan European Corridor
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
2
Corridor IV The network of railway lines:
Dresden Nürnberg
Praha
Vienna
Budapest Arad Bucharest
Constanta
Sofia Istanbul Thessaloniki
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
3
Competitive Position in 2005 Section Dresden-Budapest - Cargo Data: 2005
RAIL
ROAD
Travel time
24 hrs
16 hrs
Reliability (estimated)
80%
87%
Price (details below)
100%
20 – 100%
Market share
ca. 35%
ca. 65%
Solution: Interoperability Harmonized Operational Processes and Regulations
q Technical Incompatibilities: Common Language ØTraction system ØTrain protection system Ø Radio communication system q Operational Processes: Ø Significant procedure differences, (except Czech/Slovak) Ø Language
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
Political Issues
4
q Today persistent preference to road traffic q Changes required: Ø higher (overall) road (toll) fee in Europe Ø restructuring in rail traffic q Our requirements are: Ø efficient political support Ø financial advantages for rail transport
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
5
Present & Plans Germany:
q Due to the chosen solution of ETCS level 2, no impact on line performance during migration from LZB. q The feasibility to renew all necessary interlocking and the installation of the ETCS system within the timeframe will be possible. It will take halve of the engineering, construction and commissioning resources of the German Railway available for CCS planning and building. Therefore it is an ambitious yet realistic project. q The time schedule for the implementation of ETCS Level 2 on the corridors is determined by the ETCS migration plan in line with the financial resources. q The realization of ETCS Level 2 on the high speed lines and secondly on the conventional corridor A Rotterdam – Milan will have priority, hence the other freight corridors are planned to be equipped with ETCS Level 2 not before 2020.
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
Present & Plans
6
Czech Republic:
q The ETCS Level 2 pilot project is currently in progress in Corridor IV, section Porícany – Kolín. The project is expected to be finalized by 2008. q In 2008 the tender for subsequent ETCS Level 2 installations should be launched for the section: German border – Praha – Kolín. This section should be completed by 2010. q In 2009 the tender for subsequent ETCS Level 2 installations should be launched for section Kolín – Brno – Austrian/Slovakian border. This section should be completed by 2011.
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
7
Present & Plans Czech Republic: q ERTMS Status 2006 Pilot project GSM-R (201 km) Pilot project for GSM-R Applications of CD, a.s.
Jiríkov
Pansky Krásná Lípa Rybnište
Dol.Žleb
Dubí
Jirko
Otvice
Kraslice
Seníky Frant.Lázne
Cho
Kadan
Luby u Chebu
Merklin N.Role
Plesná
Sokolov ice Tršn
Dalovice Karlovy Vary
mut ov Pos tolo prst y
Kadanský Rohozec Kaštice
Mladá Boleslav
M.L abe Lužec
Hostivice
Jicín
Planá u Mar.L.
Hnevceves
Lysá n.L.
Svojšín
Plzen
Hradec Králové
Vel. Osek Pecky
Bošice
Vrané n. Vlt.
Zadní Trebán
Prelouc Kutná Hora
Becváry
Chrást Lochovice
Hermanova Hut Nýrany
Dobríš
Rožmitál
Stankov
Sedlcany
Olbramovice
Breznice Havlovice
Domažlice
Moravany Herman. Mestec
Ch. mesto
Chocen
Letohr
Dolní Lipka
ad
Lanškroun
C.Trebová
Tremešná ve Sl.
Vrbno p.Prad.
Kouty n.Des.
Krnov Petrov n.Des.
Štíty
Rudoltice
M.Morávka
Bludov Rýmarov
Milotice Bruntál Svob.Hermanice Valšov
Chuchelná Kravare
Zábreh Trhový Štepánov
Svetlá n. Sáz.
Blatná
Chromice
Bílovec
Dobronín
Fulnek
Olomouc
Polná
Kostelec u Jihl. Horní Cerekev
Frýdek Místek
Týn n.Vlt. Cícenice
Volary
N. Údolí
Pro
Tišnov
jov
Tovacov
Nezamyslice
Okríšky Jindr.Hr.
Ceské Budejovice
Verovice Hodslavice
Jemnice Slavonice
Kromeríž Zborovice Morkovice
Holubice
Brno
Mor. Bránice Hrušovany Pohorelice
Vsetín
Hulín Zlín stred
St. Mesto
Šatov H.Dvorište
Lúky p.M. ŽSR
Luhacovice Kunovice
Kyjov
Hustopece u B. Hrušovany n.Jev.
Hor.Lidec
Korycany
Cejc
Bylnice
Mor. Písek Veselí n.Mor.
Šakvice
C.Velenice
Vizovice
Otrokovice
Nemotice
Ždánice
Židlochovice Vranovice
Rybník
Mosty u Jablunkova
Vel. Karlovice
Strelice
Mor.Budejovice dopravna JED
Ostravice
Rožnov p.Radh.
Oslavany N. Bystrice
Frýdlant n. O.
Prerov
Studenec
Rakšice
Lipno n.Vlt.
ste
Dluhonice Drahotuše
Veselí n.L.
Dívcice
DEUTSCHLAND
Nový Jicín
Kostelec na Hané
Skalice n.S.
Križanov
Ko jetín
Železná Ruda
Bechyne Putim Protivín
C.Tešín
Studénka
Obratan Písek
Ražice
Petrovice u Karv.
Karviná mesto Kuncice
Senice na Hané
Tábor
e ovic mar Det
O.Svinov
Litovel predmestí
Ždár n.Sáz.
umín
Budišov n.Budiš.
Ce rve nka Mladec
Humpolec
Janovice n. Ú.
Boh
Hlucín
Ostrava
Svitavy
Havlíckuv Brod
Horaždovice
Osoblaha
Zlaté Hory
Lipová Lázne
Sobotím Ústí n. Orl.
Prachovice Žleby Tremošnice
Nepomuk
Ceská Kubice
Ha St. Mesto p. S. nu šo vic e
Lichkov
Zruc Pobežovice
Jindr.ve Sl. Rokytnice v O.h.
Pardubice
Cáslav Ledecko
Benešov u Prahy
Nezvestice
Solnice
Chrudim
Cercany
Rokycany
Vidnava Velká Kraš Mikulovice
Chlumec Záborí n. L.
Kourim
Javorník ve Sl. Dobruška
ište Týn . n.O
Kolín
Zdice
Stupno
Bor
Jaromer Smirice Opocno
Nymburk
Rudná u Prahy Radnice
Václavice
Milovice
Celákovice Mochov P. Bechovice Porícany
Beroun Pnovany
Starkoc
Kopidlno
P. Holešovice
Nucice
Pilot project ETCS Level 2 (22 km)
Otovice
Dol.Bousov
Krinec
e vic rato Ne
Podlešín
Mladotice
Mezimestí Tepli ce n. M et .
Všetaty
Kra lup y
Praha
ík vn ko Ra
Kolešovice Blatno u Jesenice
Protivec
Královec
Libun
Ostromer Krupá Lužná
Mar. Lázne
Tachov
Žaclér Vrchlabí Svoboda n. Ú. Kuncice
St.Paka
Krásný Jez
Becov n.Teplou
Bezdružice
Žel. Brod
Bakov
Vranany Velvary
Zlonice
POLSKA
Harrachov
Tanvald Rokytnice n.Jiz.
Turnov Ro udn ice
Straškov
Bochov
Cheb
Dul fuv Jose
a vk ržo Sm
Mimon st.nádraží
Lovosice Cížkovice
Lou ny pre d.
C.
Raspenava Bílý Potok p. S.
Úštek hor.n.
Libochovice Louny
Žatec
Vilémov
Chodov N.Sedlo
Aš
Obrnice
Jedlová
Me lník
Vejprty
Potucky
v lant Frýd
Hrádek n.N.
Šenov Benešov
Ústí n. L.
e L o u k a u L i t v í n o v a Teplic Litvínov Duchcov Most Bilina v
Rumburk Varnsdorf
C.Kamenice
Decín
Moldava v Kr.h.
Hranice v C.
Cernousy
Mikulášovice
Martinice
DEUTSCHLAND
Újezdec
Vlárský Prusmyk
Rohatec Zajecí Lednice
Hevlín Borí Les
Mutenice Hodonín Sudomerice
Breclav
Vrbovce
SLOVENSKO
ÖSTERREICH
Corridor X
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
8
Present & Plans Czech Republic: q ERTMS Status 2006 Pilot project GSM-R (201 km)
GSM-R Pilot in trial operation
Pilot project for GSM-R • Length: DEUTSCHLAND 201 km in Corridor IV Applications of CD, a.s. Decín – Decín – Praha – Kolín, • Double track section:Ústí[DE] n. L. POLSKA • Technology: Nortel, 37 BTS, 10 cab radios Kapsch, Pilot project ETCS Level 2 (22 km) 100 mobiles SAGEM (20 OPH, 80 GPH) Jiríkov
Cernousy
Mikulášovice
Pansky Krásná Lípa Rybnište
Dol.Žleb
Merklin
N.Role
Seníky
Sokolov ice Tršn
Dalovice
Karlovy Vary
Obrnice
mut ov Pos tolo prst y
Lovosice Cížkovice
Lou ny pre d.
Kadanský Rohozec
Kaštice
Vranany Velvary
Zlonice
Žaclér Vrchlabí Svoboda n. Ú. Kuncice
Mladá Boleslav
Jicín
Starkoc
Kolešovice Blatno u Jesenice
Všetaty
Kra lup y
Podlešín
Otovice
Dol.Bousov
Ostromer
Krupá Lužná
Mezimestí
Tepli ce n. M et .
Libun
M.L abe Lužec
Krásný Jez
Becov n.Teplou
Královec
St.Paka
Václavice
Kopidlno
Krinec
e vic rato Ne
Cheb
Žel. Brod
Bakov
Straškov
Bochov
Harrachov
Tanvald Rokytnice n.Jiz.
Turnov
Ro udn ice
Libochovice Louny
Žatec
Vilémov
Chodov N.Sedlo
Aš
Frant.Lázne
Cho
Kadan
Luby u Chebu
Plesná
Dul fuv Jose
a vk ržo Sm
Mimon st.nádraží
Úštek hor.n.
Martinice
Otvice
Kraslice
Hranice v C.
Šenov Benešov
e L o u k a u L i t v í n o v a Teplic Litvínov Duchcov Most Bilina v
Me lník
Jirko
C.
Raspenava
Bílý Potok p. S.
Dubí
Vejprty
v lant Frýd
Hrádek n.N.
Jedlová
C.Kamenice
Moldava v Kr.h.
Potucky
Rumburk Varnsdorf
Hnevceves
Milovice
Jaromer
Javorník ve Sl.
In realization – Pilot project for GSM-R applications Plzen of CD Protivec
Bezdružice
Praha
ík vn ko Ra
Mar. Lázne
Mladotice
Lysá n.L.
Celákovice Mochov P. Bechovice Porícany
Pecky
Rudná u Prahy
Bošice
Vrané n. Vlt.
Zadní Trebán
Prelouc
Kutná Hora
Becváry
Chrást
Lochovice
Hermanova Hut Nýrany
Dobríš
Benešov u Prahy
Nezvestice Rožmitál
Stankov
Sedlcany
Jindr.ve Sl.
Rokytnice v O.h.
Ha St. Mesto p. S. nu šo vic e
Pardubice
Lichkov
Moravany
Herman. Mestec
Ch. mesto
Chocen
Letohr
Dolní Lipka
ad
Ústí n. Orl.
Prachovice Žleby Tremošnice
Ledecko
Osoblaha
Zlaté Hory
Lipová Lázne
Tremešná ve Sl.
Vrbno p.Prad.
Kouty n.Des.
Krnov
Sobotím
Cáslav
Lanškroun
C.Trebová
Zruc Pobežovice
Solnice
Chrudim
Cercany
Rokycany
Velká Kraš
Mikulovice
Chlumec
Záborí n. L.
Kourim
Vidnava
Dobruška
ište Týn . n.O
Kolín
Zdice
Stupno
Svojšín
Bor
Hradec Králové
Vel. Osek
Beroun
Radnice
Pnovany
Smirice Opocno
Nymburk
P. Holešovice
Nucice
Planá u Mar.L.
Tachov
Hostivice
Petrov n.Des.
Štíty
Rudoltice
M.Morávka
Bludov Rýmarov
Milotice Bruntál Svob.Hermanice Valšov
Chuchelná Kravare
Zábreh
Boh
Hlucín
umín
e ovic mar Det
• Will be equipped: 102 RS*, 25 operational points, 200 mobiles Olbramovice
Breznice
Havlovice
Domažlice
Trhový Štepánov
Svetlá n. Sáz.
Havlíckuv Brod
Blatná
Ceská Kubice
Budišov n.Budiš.
Ce rve nka Mladec
Chromice
Humpolec
Janovice n. Ú.
Kuncice
Bílovec
Dobronín
Fulnek
Olomouc
Polná
Frýdek Místek
Obratan
Železná Ruda
Bechyne
Kostelec u Jihl.
Putim Protivín
Horní Cerekev
Týn n.Vlt. Cícenice
Pro
ste
Dluhonice Drahotuše
jov
Tovacov
Verovice Hodslavice
Frýdlant n. O. Ostravice
ETCS Level 2 Pilot in realization Tišnov
Veselí n.L.
Nezamyslice
Okríšky
Dívcice
DEUTSCHLAND
Nový Jicín
Kostelec na Hané
Skalice n.S.
Križanov
Jindr.Hr.
Ceské Budejovice
Prerov
Ko jetín
Písek
Ražice
Petrovice u Karv.
C.Tešín
Studénka
Senice na Hané
Tábor
Karviná mesto
O.Svinov
Litovel predmestí
Ždár n.Sáz. Horaždovice
Ostrava
Svitavy
Nepomuk
Rožnov p.Radh.
Studenec
Mosty u Jablunkova
Vel. Karlovice
Kromeríž Zborovice Morkovice
Holubice
Strelice
Vsetín
Hulín
Zlín stred
Oslavany
Vizovice
• Length: 22 km in Corridor IV • Double track section: Porícany – Kolín covered by Breclav As of 1.1.2006 : 29 GSM-R Cab Radios (CR) in total 1RBC and balise GSM-R, technology from Ansaldo SLOVENSKO 16 CR for cross-border operation in the DB GSM-R ÖSTERREICH • 4x on-board by CSEE Transport, national STM for Network 7 CR – series 680 (Pendolino) ATP system Corridor LS X Volary
N. Údolí
N. Bystrice
Jemnice
Mor.Budejovice dopravna JED
Slavonice
Rakšice
Brno
Mor. Bránice
Hrušovany Pohorelice
Kyjov
Hustopece u B.
Hrušovany n.Jev.
Šatov
Lúky p.M. ŽSR
Luhacovice
Cejc
Bylnice
Mor. Písek
Veselí n.Mor.
Šakvice
C.Velenice
Rybník
H.Dvorište
St. Mesto
Kunovice
Vranovice
Lipno n.Vlt.
Hor.Lidec
Korycany
Ždánice
Židlochovice
Otrokovice
Nemotice
Újezdec
Vlárský Prusmyk
Rohatec
Zajecí
Lednice
Hevlín
Mutenice Hodonín
Sudomerice
Vrbovce
Borí Les
6 CR within GSM-R pilot
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
9
Present & Plans Czech Republic: q10 year ERTMS Network Extension Plan Pan-European Corridors Lines Connecting European Corridors AGTC Other Major Lines
GSM-R in 2013: DEUTSCHLAND • 2539 km of main lines Decín • 1535 cab radios Ústí n. L.
Jiríkov Cernousy
Mikulášovice Pansky Krásná Lípa Rybnište
Dol.Žleb
Seníky Frant.Lázne
Cho
Kadan
Luby u Chebu
Merklin N.Role
Plesná
Sokolov ice Tršn
Dalovice Karlovy Vary
mut ov Pos tolo prst y
Kaštice
Vranany Velvary
M.L abe Lužec
Mladotice
Hostivice
Jicín
Planá u Mar.L.
Hnevceves
Lysá n.L.
Svojšín
Radnice
Pecky
Zadní Trebán
Bošice
Prelouc Kutná Hora
Becváry
Lochovice
Hermanova Hut Nýrany
Dobríš Benešov u Prahy
Nezvestice
Mikulovice
Rožmitál
Stankov
Sedlcany
Olbramovice
Breznice Havlovice
Domažlice
Jindr.ve Sl. Rokytnice v O.h.
Lichkov Moravany
Herman. Mestec
Ch. mesto
Chocen
Letohr
Dolní Lipka
Žleby
ad
Ústí n. Orl.
Prachovice Tremošnice
Lanškroun
C.Trebová
Tremešná ve Sl.
Vrbno p.Prad.
Krnov Petrov n.Des.
Štíty
Rudoltice
M.Morávka
Bludov Rýmarov
Milotice Bruntál Svob.Hermanice Valšov
Chuchelná Kravare
Zábreh Trhový Štepánov
Svetlá n. Sáz.
Blatná
Chromice
Bílovec
Dobronín
Fulnek
Polná
Frýdek Místek
Obratan
Železná Ruda
Bechyne
Kostelec u Jihl.
Putim Protivín
Horní Cerekev
Týn n.Vlt. Cícenice
Volary
N. Údolí
Pro
Tišnov
Verovice Hodslavice
Kromeríž Zborovice Morkovice
Holubice
Strelice
Jemnice
Mor.Budejovice dopravna JED
Slavonice
Brno
Mor. Bránice Hrušovany Pohorelice
Židlochovice
Zlín stred
ETCS L2 within the next ÖSTERREICH 10 years
Hevlín
Budapest April 6th, 2006
Hor.Lidec
St. Mesto
Lúky p.M. ŽSR
Luhacovice Kunovice
Cejc
Bylnice
Mor. Písek Veselí n.Mor.
Újezdec
Vlárský Prusmyk
Rohatec Zajecí Lednice
• 1446 km of Corridor lines • 317 on-board for locos and VIX X Corridors IV Corridor Corridorin
Vizovice
Otrokovice
Korycany
Kyjov
Hustopece u B. Hrušovany n.Jev. Šatov
Mosty u Jablunkova
Vsetín
Hulín
Nemotice
Ždánice
Šakvice
C.Velenice Rybník
Ostravice
Rožnov p.Radh.
Oslavany N. Bystrice
Frýdlant n. O.
Prerov Vel. Karlovice
Vranovice
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Tovacov
Studenec
Rakšice
H.Dvorište
Dluhonice Drahotuše
jov
Nezamyslice
Okríšky Jindr.Hr.
Ceské Budejovice Lipno n.Vlt.
ste
Veselí n.L.
Dívcice
DEUTSCHLAND
Nový Jicín
Kostelec na Hané
Skalice n.S.
Križanov
Ko jetín
Písek
Ražice
C.Tešín
Studénka
Olomouc
Petrovice u Karv.
Karviná mesto Kuncice
Senice na Hané
Tábor
e ovic mar Det
O.Svinov
Litovel predmestí
Ždár n.Sáz.
umín
Budišov n.Budiš.
Ce rve nka Mladec
Humpolec
Janovice n. Ú.
Boh
Hlucín
Ostrava
Svitavy
Havlíckuv Brod
Horaždovice
Warszawa Corridor II
Osoblaha
Zlaté Hory
Lipová Lázne Kouty n.Des.
Sobotím
Cáslav Ledecko
Nepomuk
Ceská Kubice
Ha St. Mesto p. S. nu šo vic e
Pardubice
Zruc Pobežovice
Vidnava Velká Kraš
Solnice
Chrudim
Cercany
Rokycany
Javorník ve Sl. Dobruška
ište Týn . n.O
Chlumec Záborí n. L.
Kourim Vrané n. Vlt.
Chrást
Bor
Hradec Králové
Vel. Osek Kolín
Zdice
Stupno
Jaromer Smirice Opocno
Nymburk
Rudná u Prahy
Plzen
Václavice
Milovice
Celákovice Mochov P. Bechovice Porícany
Beroun Pnovany
Starkoc
Kopidlno
P. Holešovice
Nucice
Otovice
Dol.Bousov
Krinec
e vic rato Ne
Podlešín
Praha
ík vn ko Ra
Kolešovice Blatno u Jesenice
Protivec
Mezimestí Tepli ce n. M et .
Všetaty
Kra lup y
POLSKA
Královec
Libun Mladá Boleslav
Ostromer Krupá Lužná
Mar. Lázne
Tachov
Žaclér Vrchlabí Svoboda n. Ú. Kuncice
St.Paka
Krásný Jez
Becov n.Teplou
Bezdružice
Žel. Brod
Bakov
Straškov Zlonice
MoU for GSM-R – CZ+SK+HU
Harrachov
Tanvald Rokytnice n.Jiz.
Turnov Ro udn ice
Lou ny pre d.
Kadanský Rohozec
Bochov
Cheb
Nürnberg
Lovosice Cížkovice
Libochovice Louny
Žatec
Vilémov
Chodov N.Sedlo
Aš
Obrnice
Dul fuv Jose
a vk ržo Sm
Mimon st.nádraží
Úštek hor.n.
Martinice
Otvice
Kraslice
Hranice v C.
Šenov Benešov
Me lník
Vejprty
C.
Raspenava Bílý Potok p. S.
Dubí
Potucky
v lant Frýd
Hrádek n.N.
Jedlová
C.Kamenice
Moldava v Kr.h.
e L o u k a u L i t v í n o v a Teplic Litvínov Duchcov Most Bilina Jirkov
Rumburk Varnsdorf
Borí Les
Mutenice Hodonín Sudomerice
Breclav
Vrbovce
SLOVENSKO
Bratislava Corridor V
dr. László Mosóczi Chief Director
10
Present & Plans Slovakia ZSR ERTMS Deployment qGSM-R :
staged implementation plan in Corridor IV, section from (CZ) – Kuty through Bratislava to Nove Zamky – Sturovo – (Szob)
q Currently in installation:
GSM-R pilot from Bratislava to Nove Zamky (approx. 90 km double track), the rail sections to Austria (Dévinska Nova Ves – Marchegg, double/single track) and to Hungary (Rusovce – Rajka, single track), and all rail stations in the Bratislava area, totaling 128 km
q Equipment Supplier:
Kapsch (Nortel technology)
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
10
Present & Plans Slovakia ZSR ERTMS Deployment q Equipment in installation:
1 MSC, 1 BSC, 18 BTS, terminals including cab radios, OPH, GPH and dispatcher terminals
q Radio Planning:
RF coverage planning and installation to EIRENE requirements for ETCS Level 2/3
q GSM-R extensions:
in planning
q ETCS Level 2 deployment:
in planning
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
10
Present & Plans Austria: q ETCS Level 1 installed on the section of the Vienna - Budapest line from Vienna to the Austrian border at Nickelsdorf q European Union call for tender in December 2001 q Contract awarded to a consortium of Alcatel Austria and Siemens q Contract signed in May 2002. q Austrian ETCS level 1 section of 65 km. q Three different types of interlocking systems in 9 stations, with 220 signals equipped. q A total of 550 Eurobalises and 64 loops with a total length of 14,4 km are installed q For the control of Infill balises approx. 80 km interface C cable were attached to the foot of the rail.
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
Present & Plans
11
Austria: q Typical applications in Austria:
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
Present & Plans
12
Austria:
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
13
Present & Plans Hungary: q European Rationale:
Ø European Rail Deregulation increases need for railway operators to dramatically improve their competitiveness
Ø Opportunity for railway operators to play a new and pivotal role role within the transport value chain
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
Present & Plans
13
Hungary: q MÁV Rationale: Ø Legacy from past 4 decades (basically no investment in new Information Information and Communication Technologies) need to be compensated very fast Ø Hungary joining the European Union increased considerably the need need to dramatically improve on competitiveness for International Freight and Passenger (Tourism!) (Tourism!) Traffic and to equally improve on Commuter Traffic capacities and resources to offset the negative impact of individual road traffic Ø Increasing the current commercial speed on some sections to 160 km/h, mainly on the PanPanEuropean corridor sections Ø The existing interlocking system (EVM) is obsolete, as trains may may not be halted safely before a dangerous point Ø In some short block sections (<1300 m) the braking distance is longer than the block Ø Monitoring the correct operation of the level crossings at increased increased commercial speed
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
14
Present & Plans Hungary: q Current European ERTMS Deployment (GSM-R, ETCS Level 2) and the deployment by its neighbors and major business partners force MÁV to leapfrog intermediate technologies and to move straight forward to deploy GSM-R and ETCS L2 at a considerably accelerated pace q Although being extremely successful, MÁV needs to convert ETCS Level 1 projects to ETCS Level 2 q Pilot Lines for GSM-R and ETCS L2 will concentrate primarily on the assessment of the applicability of current national railway operation procedures than to test technology. q Define implementation priorities and reclassify railway network q Assess financial resources and funds required for the accelerated introduction of ERTMS Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
15
Present & Plans Hungary:
Kiev, Moscow
Hungarian Railway Network and Corridors
Vienna, Munich, Zurich
Berlin, Prague
IV.
IV. ETCS Level 1
V.
Venezia, Tieste
V.
IV.
XB.
VB. Fiume
Belgrade
Thessaloniki, Constanta, Istanbul
Vc. Sarajevo, Ploce
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
Present & Plans
16
Hungary:
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
17
Present & Plans Romania: q Northern branch (830 km) and southern branch (490 km) q Each tender for rehabilitation of the corridor lines will include mandatory the implementation of ETCS; q Activities: Ø Ø Ø Ø
Bucharest-Constantza line – 225 km; contracted by Siemens and Alcatel Bucharest-Campina line: 90 km; commissioned by Siemens Campina-Predeal: 50 km; tender will be open on 1 February 2006 Predeal-Brasov: 26 km; foreseen to be equipped until 2012
q Pilot BEAR (Békéscsaba-Arad) project: Ø prepare for tender Ø with loop and GSM-R voice tests Ø 2 locos
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
Present & Plans
18
Romania:
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
Present & Plans
19
ERTMS is spreading, but today’s deployment is far from being optimal:
until 2020 after 2020 ETCS L1 ETCS L2 Dresden Dresden Nürnberg
Praha
Vienna Vienna
Budapest Arad Bucharest Bucharest
Constanta
Sofia Istanbul Thessaloniki
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
20
For a brighter future Suggested Actions :
q Financial decisions (scheduling, prices of onboard equipment and trackside) q Closer coordination between the corridor operators q Acceleration of the specification update process q Proactive Political assistance and support
Hungarian State Railway Co. Ltd. Infrastructure Business Unit
Budapest April 6th, 2006
dr. László Mosóczi Chief Director
21
Towards Thank you a Masterplan for your attention ! For Deployment Hungarian State Railway Co. Ltd. Infrastructure Business Unit