2015
LAPORAN STATISTIK STATISTIC REPORT
2015
LAPORAN STATISTIK STATISTIC REPORT
2015
2
LAPORAN STATISTIK STATISTIC REPORT
DAFTAR ISI
TABLE OF CONTENTS
DAFTAR ISI Table of Contents
2
Penyediaan Tenaga Listrik Electricity Supply
16
Kinerja Performance
56
Pengiriman Energi Energy Transfer
20
Kinerja Per Unit Performance Per Unit
57
DAYA TERPASANG Installed Capacity
24
KEUANGAN Financial
66
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI Production, Sales and Self Consumption
28
KEPEGAWAIAN Human Resources
70
Produksi Per Unit Production Per Unit
PENJELASAN Glossary of Terms
75
29
7
Penjualan Per Unit Sales Per Unit
33
8
36
DAFTAR SINGKATAN List of Abbreviation
76
Pemakaian Sendiri Per Unit Self Consumption Per Unit Produksi Per Jenis Pembangkit Production Per Power Plant Type
38
Penjualan Per Jenis Pembangkit Sales Per Power Plant Type
41
Pemakaian Sendiri Per Jenis Pembangkit Self Consumption Per Power Plant Type
45
PEMAKAIAN BAHAN BAKAR Fuel Consumption
48
Pemakaian Bahan Bakar Per Unit Fuel Consumption Per Unit
50
Pemakaian Bahan Bakar Per Jenis Pembangkit Fuel Consumption Per Power Plant Type
53
DAFTAR TABEL Table List
3
DAFTAR GRAFIK Graphic List
4
PENGANTAR Foreword
5
PROFIL PERUSAHAAN Company Profile Identitas Perusahaan Corporate Identity Sejarah Singkat Brief History
IKHTISAR Summary
KINERJA OPERASIONAL Operational Performance
SISTEM JAWA BALI Java Bali System
10
LAPORAN STATISTIK STATISTIC REPORT
2015
3
DAFTAR TABEL TABLE LIST
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
Penyediaan Tenaga Listrik Sistem Jawa Bali Tahun 2011-2015 Electricity Supply of Java Bali System in 2011-2015 Penyediaan Tenaga Listrik PT PJB (MW) Tahun 2015 Electricity Supply of PT PJB (MW) in 2015 Penyediaan Tenaga Listrik Tanjung Jati B dan UPJB Tahun 2015 Electricity Supply of Tanjung Jati B and UPJB in 2015 Penyediaan Tenaga Listrik IPP Tahun 2015 Electricity Supply of IPP in 2015 Pengiriman Energi ke Sistem Jawa Bali Tahun 2011-2015 Energy Transferred to Java Bali System in 2011-2015 Realisasi Pengiriman Energi ke Sistem Jawa Bali Tahun 2014-2015 dan Rencana Tahun 2016 Realization of Energy Transferred to Java Bali System in 2014-2015 and Plan of 2016 Daya Terpasang Pembangkit yang dimiliki Perusahaan Tahun 2011-2015 Installed Capacity of Units Owned by the Company in 2011-2015 Daya Terpasang Pembangkit yang Dikelola Perusahaan Tahun 2011-2015 Installed Capacity of Units Managed by the Company in 2011-2015 Daya Terpasang Pembangkit Tahun 2015 Installed Capacity of Units in 2015 Daya Terpasang Pembangkit dari Pembelian Tenaga Listrik Tahun 2011-2015 Installed Capacity of Units Owned by the Purchase of Electricity in 2011-2015 Pertumbuhan Produksi, Penjualan dan Pemakaian Sendiri Tahun 2011-2015 Production, Sales and Self Consumption Growth in 2011-2015 Realisasi Produksi Tahun 2014-2015 dan Rencana Tahun 2016 Production Realization in 2014-2015 and Plan of 2016 Produksi Per Unit Tahun 2015 Production Per Unit in 2015 Realisasi Penjualan Tahun 2014-2015 dan Rencana Tahun 2016 Sales Realization in 2014-2015 and Plan of 2016 Penjualan Per Unit Tahun 2015 Sales Per Unit in 2015 Realisasi Pemakaian Sendiri Tahun 20142015 dan Rencana Tahun 2016 Self Consumption Realization in 20142015 and Plan of 2016 Pemakaian Sendiri Per Unit Tahun 2015 Self Consumption Per Unit in 2015
16 18 18 19 19
20 19 20
22
24
21
22
23
24 25 25 26 26
28
26
27
29
28
31
29
33 30 34 36
37
31
32
Realisasi Produksi Per Jenis Pembangkit Tahun 2014-2015 dan Rencana Tahun 2016 Production Realization Per Power Plant Type in 2014-2015 and Plan of 2016 Produksi Per Jenis Pembangkit Tahun 2015 Production Per Power Plant Type in 2015 Realisasi Penjualan Per Jenis Pembangkit Tahun 2014-2015 dan Rencana Tahun 2016 Sales Realization Per Power Plant Type in 2014-2015 and Plan of 2016 Penjualan Per Jenis Pembangkit Tahun 2015 Sales Per Power Plant Type in 2015 Realisasi Pemakaian Sendiri Per Jenis Pembangkit Tahun 2014-2015 dan Rencana Tahun 2016 Self Consumption Realization Per Power Plant Type in 2014-2015 and Plan of 2016 Pemakaian Sendiri Per Jenis Pembangkit Tahun 2015 Self Consumption Per Power Plant Type in 2015 Pemakaian Bahan Bakar Tahun 2011-2015 Fuel Consumption in 2011-2015 Realisasi Pemakaian Bahan Bakar Per Unit Tahun 2014-2015 dan Rencana Tahun 2016 Fuel Consumption Realization Per Unit in 2014-2015 and Plan of 2016 Pemakaian Bahan Bakar Per Unit Tahun 2015 Fuel Consumption Per Unit in 2015 Realisasi Pemakaian Bahan Bakar Per Jenis Pembangkit Tahun 2014-2015 dan Rencana Tahun 2016 Fuel Consumption Realization Per Power Plant Type in 2014-2015 and Plan of 2016 Pemakaian Bahan Bakar Per Jenis Pembangkit Tahun 2015 Fuel Consumption Per Power Plant Type in 2015 Kinerja Unit Indonesia Power Tahun 2011-2015 Indonesia Power Unit Performance in 2011-2015 Realisasi EAF Tahun 2014-2015 dan Rencana Tahun 2016 EAF Realization in 2014-2015 and Plan of 2016 Realisasi CF Tahun 2014-2015 dan Rencana Tahun 2016 CF Realization in 2014-2015 and Plan of 2016 Kinerja Unit Pembangkitan Suralaya Tahun 2015 Suralaya Generating Unit Performance in 2015
38 33
40
41
42
44
46
48
34
35
36
37
38
39
50
40 51
53
41
42 54 43 56
44 45
57 46 57 47 58 48
Kinerja Unit Pembangkitan dan Jasa Pembangkitan Priok Tahun 2015 Priok Generating and Generating Services Unit Performance in 2015 Kinerja Unit Pembangkitan Saguling Tahun 2015 Saguling Generating Unit Performance in 2015 Kinerja Unit Pembangkitan dan Jasa Pembangkitan Kamojang Tahun 2015 Kamojang Generating and Generating Services Unit Performance in 2015 Kinerja Unit Pembangkitan Mrica Tahun 2015 Mrica Generating Unit Performance in 2015 Kinerja Unit Pembangkitan Semarang Tahun 2015 Semarang Generating Unit Performance in 2015 Kinerja Unit Pembangkitan Perak Grati Tahun 2015 Perak Grati Generating Unit Performance in 2015 Kinerja Unit Pembangkitan dan Jasa Pembangkitan Bali Tahun 2015 Bali Generating and Generating Services Unit Performance in 2015 Pertumbuhan Jumlah Aktiva, Laba Tahun Berjalan, Pendapatan Usaha dan Pendapatan Penjualan Energi Listrik Tahun 2011-2015 Growth of Total Asset, Income of the Year, Revenue and Electricity Sales Revenue in 2011-2015 Pendapatan Penjualan Energi Listrik Per Unit Tahun 2015 (dalam juta) Electricity Sales Revenue Per Unit in 2015 (in million) Pendapatan Penjualan Energi Listrik Per Jenis Pembangkit Tahun 2015 (dalam juta) Electricity Sales Revenue Per Power Plant Type in 2015 (in million) Laba Rugi Tahun 2014-2015 (dalam juta) Profit/Loss Statement in 2014-2015 (in million) Jumlah Pegawai Aktif Tahun 2011-2015 Total of Active Employees in 2011-2015 Jumlah Pegawai Berdasarkan Usia Tahun 2015 Total Employees Based on Age in 2015 Jumlah Pegawai Berdasarkan Jenjang Jabatan Tahun 2015 Total Employees Based on Position Level in 2015 Jumlah Pegawai Berdasarkan Jenis Kelamin Tahun 2015 Total Employees Based on Gender in 2015 Jumlah Pegawai Berdasarkan Pendidikan Tahun 2015 Total Employees Based on Education in 2015
58
59
60
61
62
63
64
66
67
68
68
70 71
72
73
74
2015
4
LAPORAN STATISTIK STATISTIC REPORT
DAFTAR GRAFIK GRAPHIC LIST
01
02
03
04
05
06
07
08
09 10
11
12 13
14
15
16
17
Penyediaan Tenaga Listrik Sistem Jawa Bali Tahun 2011-2015 (MW) Electricity Supply of Java Bali System in 2011-2015 (MW) Pengiriman Energi ke Sistem Jawa Bali Tahun 2011-2015 (GWh) Energy Transferred to Java Bali System in 2011-2015 (GWh) Realisasi Pengiriman Energi ke Sistem Jawa Bali Tahun 2014-2015 dan Rencana Tahun 2016 (GWh) Realization of Energy Transferred to Java Bali System in 2014-2015 and Plan of 2016 (GWh) Daya Terpasang Pembangkit yang dimiliki Perusahaan Tahun 2011-2015 Installed Capacity of Units Owned by the Company in 2011-2015 Daya Terpasang Pembangkit yang Dikelola Perusahaan Tahun 2011-2015 (MW) Installed Capacity of Units Managed by the Company in 2011-2015 (MW) Produksi dan Penjualan Tahun 2011-2015 (GWh) Production and Sales in 2011-2015 (GWh) Pertumbuhan Produksi dan Penjualan Tahun 2011-2015 (%) Growth of Production and Sales in 20112015 (%) Realisasi Produksi Tahun 2014-2015 dan Rencana Tahun 2016 (GWh) Production Realization in 2014-2015 and Plan of 2016 (GWh) Pertumbuhan Produksi Tahun 2014 dan Tahun 2015 (%) Production Growth in 2014 and 2015 (%) Produksi per Unit Tahun 2015 (GWh) Production based on Unit in 2015 (GWh) Realisasi Penjualan Tahun 2014-2015 dan Rencana Tahun 2016 (GWh) Sales Realization in 2014-2015 and Plan of 2016 (GWh) Pertumbuhan Penjualan Tahun 2014 dan Tahun 2015 (%) Sales Growth in 2014 and 2015 (%) Penjualan Per Unit Tahun 2015 (GWh) Sales Per Unit in 2015 (GWh) Realisasi Pemakaian Sendiri Tahun 20142015 dan Rencana Tahun 2016 (%) Self Consumption Realization in 2014-2015 and Plan of 2016 (%) Pemakaian Sendiri Per Unit Tahun 2015 (%) Self Consumption Per Unit in 2015 (%) Realisasi Produksi Per Jenis Pembangkit Tahun 2014-2015 dan Rencana Tahun 2016 (GWh) Production Realization Per Power Plant Type in 2014-2015 and Plan of 2016 (GWh) Pertumbuhan Produksi Per Jenis Pembangkit Tahun 2014 dan Tahun 2015 (%) Production Growth Per Power Plant Type in 2014 and 2015 (%)
16 18 20 19 22 20
24
21
25 22 28
28
30
30
32
23
24
25
26
33 27 34
35
28
36
37
29
39
30 39 31
Produksi Per Jenis Pembangkit Tahun 2015 (GWh) Production Per Power Plant Type in 2015 (GWh) Realisasi Penjualan Per Jenis Pembangkit Tahun 2014-2015 dan Rencana Tahun 2016 (GWh) Sales Realization Per Power Plant Type in 2014-2015 and Plan of 2016 (GWh) Pertumbuhan Penjualan Per jenis Pembangkit Tahun 2014-2015 (%) Sales Growth Per Power Plant Type in 2014 and 2015 (%) Penjualan Per Jenis Pembangkit Tahun 2015 (GWh) Sales Per Power Plant Type in 2015 (GWh) Realisasi Pemakaian Sendiri Per Jenis Pembangkit Tahun 2014-2015 dan Rencana Tahun 2016 (%) Self Consumption Realization Per Power Plant Type in 2014-2015 and Plan of 2016 (%) Pemakaian Sendiri Per Jenis Pembangkit Tahun 2015 (%) Self Consumption Per Power Plant Type in 2015 (%) Pemakaian Bahan Bakar HSD dan MFO Tahun 2011-2015 (kiloliter) HSD and MFO Fuel Consumption in 20112015 (kiloliter) Pertumbuhan Pemakaian Bahan Bakar HSD dan MFO Tahun 2011-2015 (%) HSD and MFO Consumption Growth in 2011-2015 (%) Pemakaian Bahan Bakar Gas (mmbtu) dan Batubara (ton) Tahun 2011-2015 Gas (mmbtu) and Coal (ton) Consumption in 2011-2015 Pertumbuhan Pemakaian Bahan Bakar Gas dan Batubara Tahun 2011-2015 (%) Gas Consumption and Coal Consumption Growth in 2011-2015 (%) Realisasi Pemakaian Bahan Bakar HSD dan MFO per Unit Tahun 2014-2015 dan Rencana Tahun 2016 (kiloliter) HSD and MFO Consumption Realization Based on Unit in 2014-2015 and Plan of 2016 (kiloliter) Realisasi Pemakaian Bahan Bakar Gas (mmbtu) dan Batubara (ton) 2014-2015 dan Rencana Tahun 2016 Gas (mmbtu) and Coal (ton) Consumption Realization in 2014-2015 and Plan of 2016 Pemakaian Bahan Bakar HSD dan MFO Tahun 2015 (kiloliter) HSD and MFO Fuel Consumption in 2015 (kiloliter) Pemakaian Bahan Bakar Gas (mmbtu) dan Batubara (ton) Tahun 2015 Gas (mmbtu) and Coal (ton) Consumption in 2015
40 32 41 33
42
43
45
34
35
36
37 46 38 48 39 49 40 49
41 49
50
42
43 51
44
45 52 46
52
47
Kinerja Unit Indonesia Power Tahun 2011-2015 (%) Indonesia Power Unit Performance in 2011-2015 (%) Kinerja Unit Pembangkitan Suralaya Tahun 2015 (%) Suralaya Generating Unit Performance in 2015 (%) Kinerja Unit Pembangkitan dan Jasa Pembangkitan Priok Tahun 2015 (%) Priok Generating and Generating Services Unit Performance in 2015 (%) Kinerja Unit Pembangkitan Saguling Tahun 2015 (%) Saguling Generating Unit Performance in 2015 (%) Kinerja Unit Pembangkitan dan Jasa Pembangkitan Kamojang Tahun 2015 (%) Kamojang Generating and Generating Services Unit Performance in 2015 (%) Kinerja Unit Pembangkitan Mrica Tahun 2015 (%) Mrica Generating Unit Performance in 2015 (%) Kinerja Unit Pembangkitan Semarang Tahun 2015 (%) Semarang Generating Unit Performance in 2015 (%) Kinerja Unit Pembangkitan Perak Grati Tahun 2015 (%) Perak Grati Generating Unit Performance in 2015 (%) Kinerja Unit Pembangkitan dan Jasa Pembangkitan Bali Tahun 2015 (%) Bali Generating and Generating Services Unit Performance in 2015 (%) Jumlah Aktiva, Laba Tahun Berjalan dan Pendapatan Usaha Tahun 2011-2015 (dalam Rp miliar) Total Asset, Income for the Year, and Revenue in 2011-2015 (in billion Rp) Pertumbuhan Jumlah Aktiva, Laba Tahun Berjalan dan Pendapatan Usaha Tahun 2011-2015 (%) Total Asset, Income for the Year, and Revenue in 2011-2015 (%) Jumlah Pegawai Aktif Tahun 2011-2015 Total of Active Employees in 2011-2015 Jumlah Pegawai Berdasarkan Usia Tahun 2015 Total Employees Based on Age in 2015 Jumlah Pegawai Berdasarkan Jenjang Jabatan Tahun 2015 Total Employees Based on Position Level in 2015 Jumlah Pegawai Berdasarkan Jenis Kelamin Tahun 2015 Total Employees Based on Gender in 2015 Jumlah Pegawai Berdasarkan Pendidikan Tahun 2015 Total Employees Based on Education in 2015
56
58
59
59
60
61
62
63
64
66
67
70 71
72
73
74
LAPORAN STATISTIK STATISTIC REPORT
2015
PENGANTAR FOREWORD
PT Indonesia Power selanjutnya disebut “Indonesia Power” atau “Perusahaan” tahun ini menerbitkan Buku Statistik Indonesia Power Tahun 2015 yang merupakan penerbitan lanjutan dari buku statistik tahun sebelumnya. Data pada buku ini disusun berdasarkan hasil data laporan Unit, konsolidasi laporan Kantor Pusat Indonesia Power dan PT PLN (Persero) dan Pusat Pengatur Beban (P2B). Buku ini dimaksudkan untuk memberikan informasi mengenai hasil kerja Perusahaan di bidang Pengusahaan Pembangkit, Niaga, Keuangan, dan SDM tahun 2015 dan perkembangannya selama 5 tahun terakhir. Sebagai sebuah perusahaan yang maju, di samping harus memiliki program-program ke depan, juga banyak meluangkan perhatian untuk melakukan analisa-analisa data perusahaan. Data statistik perusahaan yang disusun dalam buku ini, pada dasarnya adalah satu upaya dari Perusahaan untuk menampilkan data-data statistik untuk menjadi sebuah informasi yang sangat berguna bagi Perusahaan. Informasi-informasi yang diperoleh dari data analisa yang kuantitatif dan cermat akan menjadi “feedback” yang baik bagi Perusahaan. Data atau informasi dari data statistik Perusahaan akan makin memberikan “value” jika disertai data-data pembanding atau informasi “best practice” dari perusahaan sejenis.
PT Indonesia Power hereinafter called as “Indonesia Power” or “the Company” publishes the 2015 Statistic Book, which is continuous edition from the previous year. Data is classified based on Unit Report, Consolidated Report of Indonesia Power and PT PLN (Persero) and Load Control Center (P2B). Statistic Book provides information about Indonesia Power’s performance in several areas, i.e. plant utilization, Sales, Finance and Human Resource in 2015 and its development during the last 5 year. As a developed company, in addition to have future programs, it is also required to pay attention on company’s data analysis. Company’s statistic data compiled in this book is basically one of Company’s efforts to show statistical data as useful information for the Company. The information obtained from quantitative and accurate analytical data will be a good feedback for the Company. Data or information from Company’s statistical data will give added values if it is followed by comparative data or best practice information from similar company.
Analisa data/informasi perusahaan bisa dijadikan “tool” bagi Perusahaan untuk pengambilan keputusan ke depan untuk menghindarkan terjadinya risiko yang sama di masa mendatang dan menjaga hal-hal positif di masa lalu untuk tetap dijaga dan diperbaiki di masa mendatang.
Company’s information or analytical data can be used as a tool for the Company to make decision in the future and to avoid the occurrence of similar risks in the future as well as to maintain the positive things in the past and improve them in the future.
Akhir kata atas nama Direksi, kami berterimakasih kepada tim yang sudah menyusun buku ini semoga bermanfaat bagi Perusahaan ke depan. Tidak ada gading yang tidak retak, upaya perbaikan ke depan dalam penyusunan buku yang sama di masa mendatang sangat diharapkan dari Pembaca/Penyusun buku ini.
Finally, on behalf of the Board of Directors, we thank the team who has compiled this book and hope it will be useful for the Company in the future. There is no ivory that is not cracked, hence, inputs from the readers/authors for further improvement of this book are still expected.
Sripeni Inten Cahyani
PLT Direktur Utama | President Director (Acting)
5
6
2015
LAPORAN STATISTIK STATISTIC REPORT
LAPORAN STATISTIK STATISTIC REPORT
2015
7
IDENTITAS PERUSAHAAN CORPORATE IDENTITY NAMA PERUSAHAAN PT Indonesia Power
CORPORATION NAME PT Indonesia Power
BIDANG USAHA Penyediaan tenaga listrik dan penyediaan jasa Operation & Maintenance (O&M).
CORE BUSINESS Electricity power supply and Operation & Maintenance service supply.
KOMPOSISI PEMEGANG SAHAM a. PT PLN (Persero) sebanyak 1 lembar saham seri 1 dan 5.215.647.598 lembar saham seri 2 b. Yayasan Pendidikan dan Kesejahteraan PT PLN (Persero) sebanyak 1 lembar saham seri 2
COMPOSITION OF SHAREHOLDERS a. PT PLN (Persero) owns 1 share series 1 and 5,215,647,598 shares series 2 b. Yayasan Pendidikan dan Kesejahteraan PT PLN (Persero) owns 1 shares series 2
TANGGAL PENDIRIAN 3 Oktober 1995
DATE OF ESTABLISHMENT October 3rd, 1995
DASAR HUKUM PENDIRIAN a. Akte Pendirian PT PLN Pembangkitan Tenaga Listrik Jawa-Bali I (PT PLN PJB I) tanggal 3 Oktober 1995 b. Akte Perubahan Nama dari PT PLN PJB I menjadi PT Indonesia Power tanggal 8 Agustus 2000
ESTABLISHMENT LEGAL BASIS a. PT PLN Pembangkitan Tenaga Listrik Jawa-Bali I (PT PLN PJB I) deed of establishment dated on October 3rd, 1995 b. Change of name deed from PT PLN PJB I into PT Indonesia Power dated on August 8th, 2000
MODAL DASAR Rp10.000.000.000.000 (sepuluh triliun rupiah)
AUTHORIZED CAPITAL Rp10,000,000,000,000 (ten trillion rupiah)
MODAL DITEMPATKAN DAN TELAH DISETOR PENUH Rp2.607.823.800.000 (dua triliun enam ratus tujuh miliar delapan ratus dua puluh tiga juta delapan ratus ribu rupiah)
CAPITAL ISSUED AND FULLY PAID Rp2,607,823,800,000 (two trillion, six hundred and seven billion eight hundred twenty three million eight hundred thousand rupiah)
KRONOLOGIS PENCATATAN SAHAM Indonesia Power belum pernah mencatatkan saham di Bursa Efek Indonesia
CHRONOLOGICAL LISTING SHARES Indonesia Power has never been listed its shares on the Indonesia Stock Exchange
KRONOLOGIS PENCATATAN EFEK LAINNYA Indonesia Power belum mencatatkan kepemilikan efek dan surat berbagai lainnya di Bursa Efek Indonesia
CHRONOLOGICAL LISTING OF OTHER STOCK Indonesia Power has never listed the ownership of stocks and other securities in Indonesia Stock Exchange
KANTOR PUSAT Jl. Jenderal Gatot Subroto Kav. 18 Jakarta Selatan 12950 Phone : (62-21) 526 7666 (Hunting) Faximile : (62-21) 525 1923, 525 2623 E-mail :
[email protected] Website : www.indonesiapower.co.id
HEAD OFFICE Jl. Jenderal Gatot Subroto Kav.18 Jakarta Selatan 12950 Phone : (62-21) 526 7666 (Hunting) Faximile : (62-21) 525 1923, 525 2623 E-mail :
[email protected] Website : www.indonesiapower.co.id
Jaringan Kantor: 5 Unit Pembangkitan (UP), 3 Unit Pembangkitan dan Jasa Pembangkitan (UPJP), 1 Unit Jasa Pemeliharaan (UJH) serta 6 Unit Jasa Pembangkitan (UJP)
Office Network: 5 Generating Unit (GU), 3 Generating and Generating Services Unit (GGSU), 1 Maintenance Services Unit (MSU) and 6 Generating Services Unit (GSU)
Entitas Anak dan Entitas Afiliasi: 5 Anak Perusahaan, 1 Perusahaan Patungan dan 1 Perusahaan Asosiasi.
Subsidiaries and Affliates: 5 Subsidiaries, 1 Joint Venture Company and 1 Affiliated Company
Keterangan: 1. Unit Pembangkitan (UP) sebagai penyedia fungsi operasional penyediaan tenaga listrik. 2. Unit Pembangkitan dan Jasa Pembangkitan (UPJP) sebagai penyedia fungsi operasional penyediaan tenaga listrik serta fungsi jasa pengelolaan O&M. 3. Unit Jasa Pembangkitan (UJP) sebagai penyedia fungsi jasa pengelolaan O&M. 4. Unit Jasa Pemeliharaan (UJH) sebagai penyedia fungsi kegiatan pemeliharaan.
Notice: 1. Generating Unit (GU) as the provider of electricity supply’s operational function. 2. Generating and Generating Services Unit (GGSU) as the provider of electricity supply’s operational function as well as O&M management services function. 3. Generating Services Unit (GSU) as the provider of O&M management services function. 4. Maintenance Services Unit (MSU) as the provider of maintenance function.
8
2015
LAPORAN STATISTIK STATISTIC REPORT
SEJARAH SINGKAT BRIEF HISTORY
Indonesia Power merupakan salah satu anak perusahaan PT PLN (Persero) yang didirikan pada tanggal 3 Oktober 1995 dengan nama PT PLN Pembangkitan Tenaga Listrik Jawa-Bali I (PT PLN PJB I) melalui Surat Keputusan Menteri Kehakiman Republik Indonesia No. C2-12496-HT.01.01. Th.1995.
Indonesia Power is one of the subsidiaries of PT PLN (Persero) which was established in October 3rd, 1995 and formerly known as PT PLN Pembangkitan Tenaga Listrik Jawa-Bali I (PT PLN PJB I) as stipulated on the Minister of Justice of the Republic of Indonesia’s Decree No. C2-12496-HT.01.01. Th.1995.
Pada tanggal 3 Oktober 2000 PT PLN PJB I secara resmi berganti nama menjadi PT Indonesia Power sebagai penegasan atas tujuan perusahaan yang menjadi perusahaan pembangkit tenaga listrik independen yang berorientasi bisnis murni. Kegiatan utama bisnis Perusahaan saat ini yakni fokus sebagai penyedia tenaga listrik melalui pembangkitan tenaga listrik dengan total kapasitas terpasang sebesar 9.111 MW dan sebagai penyedia jasa operasi dan pemeliharaan pembangkit listrik dengan kapasitas terpasang sebesar 5.233 MW yang mengoperasikan pembangkit yang tersebar di Indonesia. Selain mengelola unit pembangkit, Indonesia Power memiliki 5 Anak Perusahaan, 1 Perusahaan Patungan dan 1 Perusahaan Asosiasi untuk mendukung strategi dan proses Bisnis Perusahaan.
In October 3rd, 2000 PT PLN PJB I officially changed its name to PT Indonesia Power to assert the Company’s goal, being an independent power company with purely business-oriented. The current main business activity of the Company’s is to focus as a provider of electrical power through power generation with total capacity installed reached to 9,111 MW and as an operation and maintenance of power plants’ service provider with total capacity installed reached to 5,233 MW that operates power plants across Indonesia. In addition to managing the generating unit, Indonesia Power has 5 Subsidiaries, 1 Joint Venture Company and 1 Affiliated Company to support the Business strategies and processes of the Company.
“Menjadi Perusahaan energi tepercaya yang tumbuh berkelanjutan” merupakan sasaran utama Indonesia Power, sebagaimana dapat dilihat dari visi Perusahaan. Dalam upaya mewujudkan visi tersebut, Perusahaan telah menetapkan misi Indonesia Power yaitu “Menyelenggarakan bisnis pembangkitan tenaga listrik dan jasa terkait yang bersahabat dengan lingkungan”. Pada tahap selanjutnya, Perusahaan menetapkan kompetensi inti Indonesia Power yakni “Operasi dan Pemeliharaan Pembangkit serta Pengembangan Pembangkit” sebagai upaya untuk meningkatkan daya saing dan menjalankan misi Perusahaan. Guna mendukung pencapaian Visi dan Misi, Perusahaan menetapkan prinsip yang menjadi landasan dalam mengarahkan perilaku individu dan kebijakan dalam Perusahaan. Prinsip-prinsip tersebut disebut Budaya Perusahaan yang tercermin dalam “Indonesia Power Way” dengan tata nilai perusahaan yaitu “IP AkSi (Integritas, Profesional, Proaktif, Sinergi)”.
“To be a trusted energy company with sustainable growth” is the main objective of Indonesia Power, which can be observed from the Company’s vision. In an effort to realize this vision, the Company has established the mission of Indonesia Power, namely “Conducting the business of power generation and related services that are friendly to the environment”. In the next phase, the Company establishes the core competencies of Indonesia Power, namely “Operation and Maintenance of Plant as well as Plant Development” as an effort to increase competitiveness and accomplishing the mission of the Company. To support the achievement of the Vision and Mission, the Company established the principles that form the basis for directing the behavior of individuals and policies within the Company. Those principles are called the Corporate Culture that is reflected in “Indonesia Power Way” with the corporate values of “IP AkSi (Integrity, Professional, Proactive, Synergy)”
Penyempurnaan proses bisnis yang lebih efektif dan efisien dilakukan melalui integrasi sistem-sistem manajemen perusahaan dengan implementasi Indonesia Power Integrated Management System (InPower IMS) yang mengintegrasikan ISO 14001 (Sistem Manajemen Lingkungan), ISO 9001 (Sistem Manajemen Mutu), ISO 31000 (Sistem Manajemen Risiko), OHSAS 18001, ISO 28001 (Sistem Manajemen Keamanan Rantai Pasokan), Malcom Baldrige, SMP (Sistem Manajemen Pengamanan), dan SMK3 (Sistem Manajemen K3), ISO 26000 (Standar Tanggung Jawab Sosial Perusahaan), ISO 55001 (Standar Manajemen Aset).
Improvement of a more effective and efficient business processes is carried through the integration of the company’s management systems with the implementation of Indonesia Power Integrated Management System (InPower IMS) that integrates ISO 14001 (Environmental Management System), ISO 9001 (Quality Management System), ISO 31000 (Risk Management System), OHSAS 18001, ISO 28001 (Security Management System for Supply Chain), Malcolm Baldrige, SMP (Security Management System), and SMK3 (HSE Management System), ISO 26000 (Standard Corporate Social Responsibility), ISO 55001 (Assets Management Standards).
LAPORAN STATISTIK STATISTIC REPORT
2015
9
10
2015
LAPORAN STATISTIK STATISTIC REPORT
IKHTISAR SUMMARY
SISTEM JAWA BALI
JAVA BALI SYSTEM
PENYEDIAAN TENAGA LISTRIK Pada Tahun 2015, total penyediaan tenaga listrik (daya mampu netto) untuk Sistem Jawa Bali mencapai 31.663,58 MW, dengan perincian: Indonesia Power sebesar 25,99% (8.230,08 MW), UPJB sebesar 25,77% (8.161,00 MW), PT PJB sebesar 20,13% (6.374,85 MW), UB Tanjung Jati B sebesar 8,35% (2.643,80 MW) dan IPP sebesar 19,75% (6.253,85 MW).
ELECTRICITY SUPPLY In 2015, the total of Java Bali System Electricity Supply (net maximum capacity) reached 31,663.58 MW, with details as follows: Indonesia Power by 25.99% (8,230.08 MW), UPJB by 25.77% (8,161.00 MW), PT PJB by 20.13% (6,374.85 MW), UB Tanjung Jati B by 8.35% (2,643.80 MW) and IPP by 19.75% (6,253.85 MW).
PENGIRIMAN ENERGI Selama tahun 2015, jumlah energi listrik yang dikirim ke Sistem Jawa Bali sebesar 165.993 GWh meningkat 1,11% dibandingkan tahun sebelumnya yang sebesar 164.167 GWh. Dari jumlah tersebut, 26,25% (43.575 GWh) dikirim oleh UPJB, 22,97% (38.129 GWh) dikirim oleh Indonesia Power, 15,35% (25.485 GWh) dikirim oleh PT PJB, 10,55% (17.507 GWh) dikirim oleh UB Tanjung Jati B, 0,01% (22 GWh) dikirim oleh Project dan 24,87% (41.275 GWh) dikirim oleh IPP.
ENERGY TRANSFERRED During 2015, total electricity transferred to Java Bali System reached 165,993 GWh, an increase of 1.11% compared to the previous year which was 164,167 GWh. From that number, 26.25% (43,575 Gwh) was transferred by UPJB, 22.97% (38,129 GWh) was transferred by Indonesia Power, 15.35% (25,485 GWh) was transferred by PT PJB, 10.55% (17,507 GWh) was transferred by UB Tanjung Jati B, 0.01% (22 GWh) was transferred by Project and 24.87% (41,275 GWh) was transferred by IPP.
INDONESIA POWER
INDONESIA POWER
DAYA TERPASANG PEMBANGKIT Jumlah daya terpasang pembangkit yang dimiliki dan dikelola oleh Indonesia Power melalui 5 Unit Pembangkitan (UP) dan 3 Unit Pembangkitan dan Jasa Pembangkitan (UPJP) di tahun 2015 untuk Sistem Jawa Bali Grid & Embedded sebesar 9.029,72 MW meningkat dari tahun sebelumnya yang sebesar 8.901,50 MW. Kenaikan kapasitas daya terpasang dikontribusi masuknya PLTDG Pesanggaran 200 MW Bali dengan status operasi secara penuh sejak bulan Mei 2015. Selain Perusahaan memiliki dan mengelola pembangkit di Jawa Bali, Perusahaan juga memiliki 3 unit pembangkit di Sumatera yang dikelola oleh Anak Perusahaan yaitu Cogindo DayaBersama (CDB) sebesar 81 MW sama dengan tahun sebelumnya. Sehingga total kapasitas terpasang pembangkit yang dimiliki Perusahaan tahun 2015 sebesar 9.110,72 MW meningkat dari tahun sebelumnya sebesar 8.982,50 MW.
GENERATOR INSTALLED CAPACITY Total installed capacity owned and managed by Indonesia Power through its 5 Generating Units (GU) and 3 Generating and Generating Services Unit (GGSU) in 2015 for the Grid & Embedded Java Bali System reached 9,029.72 MW, an increase from previous year which reached 8,901.50 MW. The increase of installed capacity was contributed by the entrance of Pesanggaran GTDPP 200 MW Bali with the operational status was fully since May 2015. Besides owning and managing power plants in Java Bali, the Company also has 3 power plant units in Sumatra which managed by its subsidiary, Cogindo DayaBersama (CDB) reached up to 81 MW in which same as last year. Therefore, total installed capacity owned by the Company in 2015 was reached 9,110.72 MW, an increase from last year which was 8,982.50 MW.
LAPORAN STATISTIK STATISTIC REPORT
2015
Kapasitas terpasang pembangkit terbesar milik Indonesia Power adalah UP Suralaya dengan kapasitas terpasang 3.400 MW (37,32%), kemudian UP Semarang sebesar 1.408,93 MW (15,46%), UPJP Priok sebesar 1.348,08 MW (14,80%), UP Perak Grati sebesar 864,08 MW (9,48%), UP Saguling sebesar 797,37 MW (8,75%), UPJP Bali sebesar 556,51 MW (6,11%), UPJP Kamojang sebesar 345 MW (3,79%), dan UP Mrica sebesar 309,74 MW (3,40%), PLTG Indralaya sebesar 45 MW (0,49%) serta PLTG Keramasan dan PLTG Jambi masing-masing sebesar 18 MW (0,20%).
The biggest installed capacity of Indonesia Power was Suralaya GU by 3,400 MW (37.32%), followed by Semarang GU by 1,408.93 MW (15.46%), Priok GGSU by 1,348.08 MW (14.80%), Perak Grati GU by 864.08 MW (9.48%), Saguling GU by 797.37 MW (8.75%), Bali GGSU by 556.51 MW (6.11%), Kamojang GGSU by 345 MW (3.79%), Mrica GU by 309.74 MW (3.40%). Indralaya GTPP by 45 MW (0.49%) and also Keramasan GTPP and Jambi GTPP by 18 MW (0.20%) each.
Dalam kegiatan usaha pengelolaan jasa Operation & Maintenance pembangkit, Perusahaan mengelola pembangkit milik PLN dengan total kapasitas terpasang pembangkit sebesar 5.233 MW di tahun 2015. Kapasitas terpasang pembangkit terbesar yang dikelola oleh Perusahaan adalah UJP Pelabuhan Ratu sebesar 1.050 MW, kemudian UJP Lontar sebesar 945 MW, PLTGU Priok Blok 3 sebesar 740 MW, UJP Adipala sebesar 660 MW, UJP Suralaya sebesar 625 MW, UJP Labuhan sebesar 600 MW, UJP Pangkalan Susu sebesar 400 MW, PLTU Barru sebesar 100 MW, PLTU Jeranjang sebesar 75 MW, PLTU Sanggau sebesar 14 MW dan PLTP Ulumbu sebesar 10 MW.
In managing the Operation & Maintenance service of power plant, the Company managed PLN’s power plants with total installed capacity reached 5,233 MW in 2015. The biggest installed capacity managed by the Company was Pelabuhan Ratu GSU by 1,050 MW, then Lontar GSU by 945 MW, Priok Block 3 CPP by 740 MW, Adipala GSU by 660 MW, Suralaya GSU by 625 MW, Labuhan GSU by 600 MW, Pangkalan Susu GSU by 400 MW, Barru SPP by 100 MW, Jeranjang SPP by 75 MW, Sanggau SPP by 14 MW and Ulumbu GPP by 10 MW.
Sebagai fungsi pendukung, Indonesia Power juga melakukan pembelian listrik di sebagian Area Bali dengan total kapasitas terpasang sebesar 220,90 MW menurun dari tahun sebelumnya sebesar 399,29 MW. Penurunan daya kapasitas terpasang terjadi karena berakhirnya kontrak pembelian tenaga listrik PLTD Pemaron pada bulan Juli 2014.
As a support function, Indonesia Power also purchased electricity in several areas of Bali with total installed capacity was 220.90 MW, a decrease compared to previous year which was 399.29 MW. The decreasing in installed capacity was due to contract termination of electricity purchase of Pemaron DPP in July 2014.
PRODUKSI Selama tahun 2015 melalui 5 UP dan 3 UPJP di sistem Jawa Bali Grid & Embedded, Indonesia Power telah memproduksi energi listrik sebanyak 39.126,74 GWh meningkat 4,45% dari tahun sebelumnya yang sebesar 37.461,12 GWh. Peningkatan produksi listrik Jawa Bali Grid & Embedded di kotribusi oleh beroperasi PLTGU Tambaklorok dengan berbahan bakar gas.
PRODUCTION In 2015, through its 5 GU and 3 GGSU in Grid & Embedded Java Bali System, Indonesia Power has produced electricity by 39,126.74 GWh, an increase of 4.45% compared to previous year of 37,461.12 GWh. The increase in electricity production of Java Bali Grid & Embedded was contributed by the operation of Tambaklorok CPP with gas fuel.
11
12
2015
LAPORAN STATISTIK STATISTIC REPORT
Sedangkan realisasi produksi listrik dari hasil Pembelian listrik di sebagian Area Bali sebesar 603,37 GWh menurun 75,02% dari tahun sebelumnya sebesar 2.415,03 GWh. Penurunan produksi dari hasil Pembelian listrik di Area Bali terjadi karena berakhirnya kontrak pembelian tenaga listrik PLTD A, C, D Pesanggaran. Sehingga total produksi listrik yang dihasilkan Indonesia Power tahun 2015 sebesar 39.730,12 GWh menurun 0,37% dari tahun sebelumnya sebesar 39.876,15 GWh.
Meanwhile, the actual electricity production from the purchase of electricity in several areas of Bali which was 603.37 GWh experienced a decrease of 75.02% from the previous year which was 2,415.03 GWh. The decline in production from electricity purchase in Bali area occurred due to the purchase contract termination in Pesanggaran A, C, D DPP. So that the total production of electricity generated by Indonesia Power in 2015 amounted to 39,730.12 GWh, a decrease of 0.37% from the previous year at 39,876.15 GWh.
Dari total produksi energi listrik yang dihasilkan pada tahun 2015, produksi listrik terbesar dihasilkan oleh UP Suralaya sebesar 23.528,45 GWh, kemudian UPJP Priok sebesar 3.434,65 GWh, UPJP Kamojang sebesar 2.892,87 GWh, UP Semarang sebesar 2.562,61 GWh, UP Saguling sebesar 2.497,13 GWh, UP Perak Grati sebesar 2.452,32 GWh, UP Mrica sebesar 897,87 GWh, UPJP Bali sebesar 860,85 GWh dan pembelian listrik Area Bali sebesar 603,37 MW.
From the total production of electrical energy produced in 2015, the biggest electricity production was produced by Suralaya GU by 23,528.45 GWh, followed by Priok GGSU by 3,434.65 GWh, Kamojang GGSU by 2,892.87 GWh, Semarang GU by 2,562.61 GWh, Saguling GU by 2,497.13 GWh, Perak Grati GU by 2,452.32 GWh, Mrica GU by 897.87 GWh, Bali GGSU by 860.85 GWh and electricity purchase in Bali area was 603.37 MW.
Berdasarkan jenis pembangkit, PLTU mencapai produksi tertinggi sebesar 23.528,45 GWh, kemudian PLTGU sebesar 8.271,98 GWh, PLTA sebesar 3.395 GWh, PLTP sebesar 2.892,87 GWh, PLTG sebesar 615,73 GWh, PLTD sebesar 603,40 GWh dan PLTDG sebesar 422,69 GWh.
Based on power plant type, SPP has attained the biggest production by 23,528.45 GWh, followed by CPP by 8,271.98 GWh, HPP by 3,395 GWh, GPP by 2,892.87 GWh, GTPP by 615.73 GWh, DPP by 603.40 GWh and GTDPP by 422.69 GWh.
PENJUALAN Energi listrik yang telah disalurkan Indonesia Power ke Sistem Jawa Bali Grid & Embedded selama tahun 2015 sebanyak 37.408,37 GWh, meningkat 4,22% dari tahun sebelumnya sebesar 35.892,42 GWh. Kenaikan penjualan energi listrik Jawa Bali Grid & Embedded tahun 2015 dibandingkan 2014, seperti disampaikan pada penjelasan penurunan produksi energi listrik.
SALES The electricity distributed by Indonesia Power to Grid & Embedded Java Bali System in 2015 was 37,408.37 GWh, an increase of 4.22% from previous year of 35,892.42 GWh. The increase in sales of electrical energy and Java Bali Grid & Embedded in 2015 compared to 2014, was as stated in the explanation of the decline in production of electrical energy.
Sedangkan realisasi penjualan listrik dari hasil Pembelian listrik di sebagian Area Bali sebesar 602,74 GWh menurun 74,97% dari tahun sebelumnya sebesar 2.407,60 GWh. Penjelasan penurunan produksi dari hasil Pembelian listrik di Area Bali seperti disampaikan pada penjelasan penurunan produksi energi listrik.
Meanwhile, the actual electricity sales from the purchase of electricity in several areas of Bali which was 602.74 GWh experienced a decrease of 74.97% from the previous year which was 2,407.60 GWh. The explanation of the decline in production from the purchase of electricity in Bali area was referred to the explanation of the decline in production of electric energy.
LAPORAN STATISTIK STATISTIC REPORT
2015
Sehingga total penjualan listrik yang dihasilkan Indonesia Power tahun 2015 sebesar 38.011,11 GWh menurun 0,75% dari tahun sebelumnya sebesar 38.300,02 GWh.
So that the total sales of electricity generated by Indonesia Power in 2015 amounted to 38,011.11 GWh, a decrease by 0.75% from the previous year which was 38,300.02 GWh.
Dari total energi listrik yang disalurkan pada tahun 2015, UP Suralaya menyalurkan energi terbesar sebanyak 22.206,08 GWh, kemudian UPJP Priok sebesar 3.366,03 GWh, UPJP Kamojang sebesar 2.759,19 GWh, UP Saguling sebesar 2.490,67 GWh, UP Semarang sebesar 2.477,34 GWh, UP Perak Grati sebesar 2.382,01 GWh, UP Mrica sebesar 883,11 GWh, UPJP Bali sebesar 843,94 GWh dan pembelian listrik Area Bali sebesar 602,74 MW.
From the total electrical energy distributed in 2015, Suralaya GU has distributed the largest electricity by 22,206.08 GWh, followed by Priok GGSU by 3,366.03 GWh, Saguling GU by 3,150.71 GWh, Kamojang GGSU by 2,759.19 GWh, Saguling GU by 2,490.67 GWh, Semarang GU by 2,477.34 GWh, Perak Grati GU by 2,382.01 GWh, Mrica GU by 883.11 GWh, Bali GGSU by 843.94 GWh and the electricity purchase in Bali area by 602.74 MW.
Berdasarkan jenis pembangkit, PLTU mencapai penjualan tertinggi sebesar 22.201,18 GWh, kemudian PLTGU sebesar 8.054,36 GWh, PLTA sebesar 3.373,79 GWh, PLTP sebesar 2.759,19 GWh, PLTG sebesar 606,35 GWh, PLTD sebesar 602,75 GWh dan PLTDG sebesar 413,40 GWh.
Based on power plant type, SPP has attained the biggest sales by 22,201.18 GWh, followed by CPP by 8,054.36 GWh, HPP by 3,373.79 GWh, GPP by 2,759.19 GWh, GTPP by 606.35 GWh, and DPP 602.75 GWh and GTDPP by 413.40 GWh.
PEMAKAIAN SENDIRI Untuk jumlah pemakaian sendiri Jawa Bali Grid & Embedded Indonesia Power di tahun 2015 sebesar 4,39% tidak lebih baik dari tahun sebelumnya sebesar 4,19%. Realisasi PS tahun 2015 tidak lebih baik dibandingkan dengan tahun 2014 terutama dari derating di PLTU suralaya. Dari total pemakaian sendiri tahun 2015, UP Suralaya adalah unit yang paling banyak mengkonsumsi energi listrik untuk pemakaian sendiri yaitu sebesar 5,62%, kemudian UPJP Kamojang sebesar 4,62%, UP Semarang sebesar 3,33%, UP Perak Grati sebesar 2,87%, UPJP Priok sebesar 2%, UPJP Bali sebesar 1,96%, UP Mrica sebesar 1,64% dan UP Saguling sebesar 0,26%.
SELF CONSUMPTION The self-consumption of Java Bali Grid & Embedded of Indonesia Power in 2015 reached 4.39% it was not better than the previous year which was 4.19%. The realization of PS in 2015 was not better than in 2014, mainly from the derating in Suralaya SPP. From the total self-consumption in 2015, Suralaya GU was the largest self-consumption of the electricity which was 5.62%, followed by Kamojang GGSU by 4.62%, Semarang GU by 3.33%, Perak Grati GU by 2.87%, Priok GGSU by 2%, Bali GGSU by 1.96%, Mrica GU by 1.64% and Saguling GU by 0.26%.
Berdasarkan jenis pembangkit di sistem PLTU yang paling banyak mengkonsumsi energi listrik untuk pemakaian sendiri sebesar 5,64%, PLTP sebesar 4,62%, PLTGU sebesar 2,63%, PLTDG sebesar 2,20%, PLTG sebesar 1,52% dan PLTA sebesar 0,62%.
Based on the types, steam power plants consume the most electricity for own use amounted to 5.64%, DPP by 4.62%, CPP by 2.63%, GTDPP by 2.20%, GTPP by 1.52% and HPP by 0.62%.
PEMAKAIAN BAHAN BAKAR Pemakaian bahan bakar yang dihitung merupakan pemakaian bahan bakar untuk menghasilkan energi listrik. Selama tahun
FUEL CONSUMPTION Fuel consumption calculated was the usage fuel to generate electrical energy. During 2015, there was an increase in fuel
13
14
2015
LAPORAN STATISTIK STATISTIC REPORT
2015, terjadi kenaikan pemakaian bahan bakar batubara dan gas sedangkan penurunan pemakaian bahan bakar terjadi pada BBM (HSD dan MFO) dibandingkan tahun sebelumnya. Untuk pemakaian batubara mencapai 12.168.482 ton atau meningkat 5,24% dari tahun sebelumnya sebesar 11.562.704 dan, pemakaian gas mencapai 76.851.477 MMBTU atau meningkat 22,30% dari tahun sebelumnya sebesar 62.838.572 MMBTU. Peningkatan pemakaian batubara dan gas sejalan dengan program perusahaan dalam pengembangan pembangkit Non BBM dan kebijakan pemerintah terkait penghematan BBM. Sedangkan pemakaian HSD sebesar 326.944 kiloliter atau menurun 57,98% dari tahun sebelumnya sebesar 778.070 kiloliter dan pemakaian jenis MFO sebesar 100.804 kiloliter atau menurun 16,98% dari tahun sebelumnya sebesar 121.422 kiloliter.
consumption of coal and gas while a decrease occurred in fuel consumption (HSD and MFO) compared to the previous year. For coal consumption reached 12,168,482 tons or increased by 5.24% from the previous year of 11,562,704 and, the use of gas reached 76,851,477 MMBTU, an increase of 22.30% from the previous year of 62,838,572 MMBTU. The increasing usage of coal and gas was in line with the Company’s program in the development of non-fuel plants and government policy related to fuel savings. While HSD usage was amounted to 326,944 kiloliters, a decrease of 57.98% from the previous year of 778,070 kiloliters and MFO usage was amounted to 100,804 kiloliters, a decrease of 16.98% from previous year of 121,422 kiloliters.
KINERJA OPERASIONAL Faktor keandalan pembangkit Indonesia Power yang tercermin pada Equivalent Availability Factor (EAF) di tahun 2015 sebesar 90,85% atau meningkat 1,08% dari tahun sebelumnya yang sebesar 89,88%. Ketercapaian kinerja EAF disebabkan oleh keberhasilan unit-unit pembangkit, seperti UPJP Priok, UP Perak Grati dan UP Suralaya dalam menjaga keandalan pembangkit dan penerapan asset management. Faktor efisiensi pembangkit Capacity Factor (CF) selama tahun 2015 sebesar 51,89% atau meningkat 3,43% dari tahun sebelumnya sebesar 50,17%.
OPERATIONAL PERFORMANCE The reliability factor of Indonesia Power which reflected by Equivalent Availability Factor (EAF) 90.85% in 2015, increase 1.08% compared to the previous year which was 89.88%. The accomplishment of EAF was supported by the achievement of power plant units, as Priok GGSU, Perak Grati GU and Suralaya GU in maintaining plant reliability and improving asset management. The power plant efficiency of Capacity Factor (CF) in 2015 by 51.89% or increased 3.43% compared to previous year of 50.17%.
KEUANGAN Pada tahun 2015, jumlah aktiva Indonesia Power mengalami peningkatan sebesar 325,34% menjadi Rp226,49 triliun dibandingkan tahun sebelumnya sebesar Rp53,25 triliun. Peningkatan aktiva perusahaan sebagai dampak dilakukannya revaluasi aset di tahun 2015. Untuk jumlah laba tahun berjalan yang dibukukan Perusahaan tahun 2015 mengalami peningkatan 184,08% menjadi Rp4,68 triliun dari tahun sebelumnya sebesar Rp1,65 triliun. Peningkatan jumlah laba tahun berjalan disebabkan oleh adanya dampak revaluasi aset, dimana revaluasi aset diakui di tahun yang sama baik dari komersial maupun fiskal sehingga menambah pendapatan pajak tangguhan. Di sisi pendapatan usaha Perusahaan tahun 2015 mencapai Rp32,00 triliun yang sebagian besar dikontribusi dari pendapatan penjualan energi listrik yang mencapai Rp30,68 triliun. Pencapaian pendapatan usaha di tahun 2015 menurun 10,37% dari tahun sebelumnya yang sebesar Rp35,72 triliun. Penurunan pendapatan usaha selaras dengan penurunan produksi dan penjualan listrik.
REVENUE Total assets of Indonesia Power in 2015 an increase 325.34% to Rp226.49 trillion compared to previous year of Rp53.25 trillion. The increasing of Company’s asset was due to asset revaluation in 2015. Total income for the year booked in 2015 increased 184.08% by Rp4.68 trillion compared to previous year of Rp1.65 trillion. The increment of total income for the year was due to the asset revaluation impact, where asset revaluation of the year was approved, both from commercial and fiscal, which in return increase the income from deferred tax. The Company’s revenue in 2015 was Rp32.00 trillion, which mainly contributed by income from electricity sales of Rp30.68 trillion. Revenue in 2015 decreased by 10.37% compared to previous year of Rp35.72 trillion. The decrement of the revenue was in line with the decrease of electricity production and sales.
KEPEGAWAIAN Jumlah pegawai aktif Indonesia Power di tahun 2015 mencapai 3.639 pegawai, meningkat 2,42% dibandingkan tahun sebelumnya yang sebesar 3.553 pegawai. Komposisi pegawai terbanyak berada di UP Suralaya dengan prosentase 19,84% dari total pegawai, 22,51% pegawai berusia dibawah 26 tahun, 46,72% pegawai berjenjang pelaksana, 89,83% pegawai berjenis kelamin pria dan 43,45% pegawai berpendidikan SMK.
HUMAN RESOURCES The total number of Indonesia Power’s employees in 2015 reached 3,639 employees, an increase of 2.42% compared to previous year of 3,553 employees. Main composition of the employee was in Suralaya GU with the percentage of 19.84% of the total employees in which 22.51% were below 26 years old, 46.72% were in managerial level, 89.83% were men and 43.45% were High School graduate.
Sistem Jawa Bali Java Bali System
2015
16
SISTEM JAWA BALI JAVA BALI SYSTEM
LAPORAN STATISTIK STATISTIC REPORT
PENYEDIAAN TENAGA LISTRIK ELECTRICITY SUPPLY Tabel Table
01
Penyediaan Tenaga Listrik Sistem Jawa Bali Tahun 2011-2015 Electricity Supply of Java Bali System in 2011-2015
Perusahaan Company
2011
Tahun | Year 2013
2012
2015
2014
MW
(%)
MW
(%)
MW
(%)
MW
(%)
MW
(%)
PT Indonesia Power PT PJB UB Tanjung Jati B UB Cilegon * UB Lontar ** UB Indramayu * IPP *** UPJB
8.192,67 6.324,00 1.983,00 1.809,00 560,00 870,00 4.191,00 -
34,24 26,43 8,29 7,56 2,34 3,64 17,51 -
7.981,62 6.324,00 2.644,00 615,00 5.667,05 5.724,00
27,56 21,84 9,13 - 2,12 19,57 19,77
8.047,62 6.323,85 2.643,80 883,00 5.784.95 6.339,00
26,81 21,06 8,81 2,94 19,27 21,11
8.167,27 6.384,00 2.643,80 5.840,85 8.161,00
26,18 20,46 8,47 18,72 26,16
8.230,08 6.374,85 2.643,80 6.253,85 8.161,00
25,99 20,13 8,35 19,75 25,77
Sistem Jawa Bali Java Bali System
23.929,67
100
28.955,67
100
30.022,22
100
31.196,92
100
31.663,58
100
Keterangan * UB Indramayu dan UB Cilegon masuk ke UPJB pada tahun 2012 ** Pada tahun 2013, UB Lontar meliputi PLTU Pacitan, Pelabuhan ratu, dan Tanjung Awar-awar dan di tahun 2014 UB Lontar masuk ke dalam UPJB *** Tahun 2015 telah masuk PLTP Kamojang 5 dan PLTU Celukan Bawang (IPP)
2011 PT Indonesia Power
2012 PT PJB
Muara Tawar
UB Tanjung Jati
31.663,58
31.196,92 UB Indramayu
2.643,80 0 0 0
0
2015
2014 UB Lontar
6.253,85 8.161,00
8.230,08 6.374,85
5.840,85 8.161,00
2.643,80
0 0 0
0
2013 UB Cilegon
8.167,27 6.384,00
5.784,95 6.339,00 0
883,00
0
2.643,80
8.047,62 6.323,85 0
5.667,05 5.724,00 0
615,00
0
2.644,00
7.981,62 6.324,00 0
1.983,00 1.809,00 560,00 870,00 4.191,00
0
8.192,67 6.324,00
23.929,67
28.955,67
01
Penyediaan Tenaga Listrik Sistem Jawa Bali Tahun 2011-2015 (MW) Electricity Supply of Java Bali System in 2011-2015 (MW)
30.022,22
Grafik Graph
Notes * UB Indramayu and UB Cilegon were operated by UPJB in 2012 ** In 2013, UB Lontar which including Pacitan SPP, Pelabuhan ratu SPP, and Tanjung Awar-awar SPP and also in 2014 UB Lontar were operated by UPJB *** In 2015, Kamojang 5 GPP and Celukan Bawang SPP were being operated
IPP
UPJB
Sistem Jawa Bali/Java Bali System
SISTEM JAWA BALI JAVA BALI SYSTEM
LAPORAN STATISTIK STATISTIC REPORT
2015
17
2015
18
Tabel Table
02
SISTEM JAWA BALI JAVA BALI SYSTEM
LAPORAN STATISTIK STATISTIC REPORT
Penyediaan Tenaga Listrik PT PJB (MW) Tahun 2015 Electricity Supply of PT PJB (MW) in 2015 Mesin Pembangkit | Power Plant
Unit Pembangkit Generating Unit
1
2
3
4
5
6
7
8
9
10
Jumlah Unit Total of Unit
11
Jumlah Kapasitas Total of Capacity
Kapasitas (MW) | Capacity (MW) UP Muara Karang Muara Karang UP Muara Tawar 12 1.740 Muara Tawar Blok 1 Muara Tawar Blok 2 Muara Tawar Blok 3&4 UP Gresik 18 3.200 Gresik GRBRU G GRBRU S GLTMR Sutami Sutami UP Brantas 25 232 Wlingi Lodoyo Selorejo Sengguruh Tulungagung Mendalan Siman Area IV Giringan
PLTU-M SPP-F PLTU-G SPP-G PLTGU-M CPP-F PLTGU-G CPP-G PLTGU-M CPP-F PLTGU-G CPP-G PLTGU-M CPP-F PLTGU-G CPP-G PLTGU-M CPP-F PLTGU-G CPP-G PLTG-M GTPP-F PLTU-M SPP-F PLTU-G SPP-G PLTGU CPP PLTGU CPP PLTG GTPP
162,00
162,00
2
718,00 324,00
90,00
90,00
90,00
124,00
4
394,00
137,00
137,00
137,00
204,00
4
1.729,00 615,00
137,00
137,00
2
274,00
140,00
140,00
140,00
140,00
140,00
140,00
6
840,00
1.971,00
15,50
15,50
2
31,00
80,00
80,00
170,00
170,00
4
500,00
100,00
100,00
100,00
100,00
100,00
100,00
100,00
100,00
100,00
9
900,00
180,00
180,00
180,00
3
540,00
102,99
PLTA HPP
34,33
34,33
34,33
3
102,99
157,87
PLTA HPP PLTA HPP PLTA HPP PLTA HPP PLTA HPP PLTA HPP PLTA HPP PLTA | HPP
26,81
26,81
2
53,62
4,46
1
4,46
4,71
1
4,71
14,23
14,23
2
28,46
17,86
17,86
2
35,72
4,20
5,50
5,50
5,50
4
20,70
3,40
3,40
3,40
3
10,20
0,88
0,88
1,40
3
7,99 3,16
Golang
PLTA | HPP
0,89
0,89
0,89
3
2,67
Ngebel
PLTA | HPP
2,16
1
2,16
UP Cirata Cirata UP Paiton Paiton Jumlah | Total
948,00
PLTA | HPP
118,50
118,50
118,50
118,50
118,50
118,50
118,50
118,50
8
948,00
PLTU-B SPP-C PLTU-M SPP-F
370,00
370,00
2
740,00 740,00
981,02 1,024,00
657,50
495,50
218,50
218,50
100,00
-
-
6.374,85
1.344,93 1.334,90
SISTEM JAWA BALI JAVA BALI SYSTEM
Tabel Table
03
LAPORAN STATISTIK STATISTIC REPORT
2015
19
Penyediaan Tenaga Listrik Tanjung Jati B dan UPJB Tahun 2015 Electricity Supply of Tanjung Jati B and UPJB in 2015 Mesin Pembangkit | Power Plant
Unit Pembangkit Generating Unit
1
2
3
4
5
6
7
8
9
10
Jumlah Unit Total of Unit
11
Kapasitas (MW) | Capacity (MW)
Jumlah Kapasitas Total of Capacity
Tanjung Jati B PLTU-B | SPP-C 660,80 660,80 661,10 661,10 4 2.643,80 UPJB 8.161,00 Pelabuhan Ratu PLTU-B | SPP-C 323,00 323,00 323,00 3 969,00 Pacitan PLTU-B | SPP-C 280,00 280,00 2 560,00 Tanjung Awar-awar PLTU-B | SPP-C 323,00 1 323,00 Suralaya 8 PLTU-B | SPP-C 590,00 1 590,00 Labuan PLTU-B | SPP-C 280,00 280,00 2 560,00 Rembang PLTU-B | SPP-C 280,00 280,00 2 560,00 Lontar PLTU-B | SPP-C 280,00 280,00 280,00 3 840,00 Priok Blok 3 PLTGU-G | CPP-G 235,00 235,00 250,00 3 720,00 Cilegon PLTGU-G | CPP-G 212,00 212,00 236,00 3 660,00 Indramayu PLTU | SPP 290,00 290,00 290,00 3 870,00 Muara Karang PLTGU | CPP 235,00 235,00 70,00 70,00 70,00 5 680,00 Repowering Muara Tawar Blok 5 PLTGU | CPP 143,00 71,00 2 214,00 Paiton 9 PLTU-B | SPP-C 615,00 1 615,00 Jumlah | Total 2.881,00 2.486,00 1.449,00 70,00 70,00 590,00 615,00 - 10.804,80 Keterangan: Notes: * Pada tahun 2014, UB Lontar yang meliputi PLTU Pacitan, Palabuhan Ratu, dan Tanjung Awar- * In 2014, UB Lontar which including Pacitan SPP, Pelabuhan Ratu SPP, and Tanjung awar masuk ke dalam UPJB Awar-awar SPP were operated by UPJB
Tabel Table
04
Penyediaan Tenaga Listrik IPP Tahun 2015 Electricity Supply of IPP in 2015 Mesin Pembangkit | Power Plant
Unit Pembangkit Generating Unit
1
2
3
4
5
6
7
8
9
10
11
Jumlah Unit 12 Total of Unit
Kapasitas (MW) | Capacity (MW) Perum Jasa Tirta II Jatiluhur PT Geo Dipa Energy Dieng Patuha PT Dayabumi Salak Pratama Ltd Salak PT Magma Nusantara Listrindo Wayangwindu Chevron Texaco Energy Indonesia Ltd Drajat II Drajat III PT Paiton Energy (PEC) Paiton 7,8 PT Jawa Power Paiton 5,6 PT Cikarang Listrindo Power Company Cikarang PT Krakatau Daya Listrik Krakatau PT Sumberenergi Sakti Prima Cilacap PT Pertamina Kamojang IV CEP Cirebon Bekasi Power Bekasi Power PT General Energy Bali Celukan Bawang Jumlah | Total
PLTA | HPP PLTP | GPP PLTP | GPP PLTP | GPP PLTP | GPP PLTP | GPP PLTP | GPP PLTU-B | SPP-C PLTU-B | SPP-C PLTG-G I GTPP - G PLTU-B | SPP-C PLTU-B | SPP-C PLTP | GPP PLTU-B | SPP-C PLTGU | CPP PLTGU | CPP
30,00
30,00
30,00
30,00
30,00
30,00
6
180,00 180,00
45,00
1
100,00 45,00
55,00
1
55,00
112,06
113,10 90,24
105,80 815,00
61,00
61,00
61,00
610,00
610,00
3 2 1 1 3
183,00 183,00 225,16 225,16 196,04 90,24 105,80 2.035,00 2.035,00
610,00 610,00
2
1.220,00 1.220,00
300,00
60,85
1 2 2
300,00 300,00
281,00
281,00
660,00 118,80 125,00 1601,86
12,005 514,34
130,00 950,80
151,85 734,00 701,00
610,00
610,00
-
-
-
-
1 1 1
660,00 660,00 118,80 118,80 380,00 380,00 6.253,85
33,00
Jumlah Kapasitas Total of Capacity
562,00 562,00 93,85 93,85
2015
20
SISTEM JAWA BALI JAVA BALI SYSTEM
LAPORAN STATISTIK STATISTIC REPORT
PENGIRIMAN ENERGI ENERGY TRANSFER
Perusahaan Company
2011 GWh 43.227 31.940 12.594 9.905 4.341 3.229 29.225 134.461
PT Indonesia Power PT PJB UB Tanjung Jati B UB Cilegon * UB Lontar ** UB Indramayu * IPP UPJB Project *** Sistem Jawa Bali Java Bali System
(%) 32,15 23,75 9,37 7,37 3,23 2,40 21,73 100
GWh 37.936 26.672 17.011 2.036 36.655 25.600 145.910
(%) 26,00 18,28 11,66 1,40 25,12 17,55 100
Keterangan: * UB Indramayu dan UB Cilegon masuk ke UPJB pada tahun 2012 ** Pada tahun 2013, UB Lontar meliputi PLTU Pacitan, Pelabuhan Ratu, dan Tanjung Awar-awar dan di tahun 2014 UB Lontar masuk ke dalam UPJB *** Penerimaan Tanjung Awar-awar unit 2 pada saat masih project
(%) 23,10 18,12 11,04 24,10 23,64 100
2015 GWh 38.129 25.485 17.507 41.275 43.575 22 165.993
(%) 22,97 15,35 10,55 24,87 26,25 0,01 100
Note: * UB Indramayu and UB Cilegon was operated by UPJB in 2012 ** In 2013, UB Lontar including Pacitan SPP, Pelabuhan Ratu SPP and Tanjung Awar-awar SPP and also UB Lontar in 2014 were operated by UPJB *** The acceptance of Tanjung Awar-awar unit 2 while in project period
2012 PT PJB
UB Tanjung Jati
UB Cilegon
UB Lontar
IPP
UPJB
165.993
41.275 43.575
2015
2014 UB Indramayu
22
0 0 0
39.563 38.801
38.129 25.485 17.507
164.167
2013
0
0 0 0
37.928 29.742 18.132
156.398
0 2.957 0
40.608 27.549 18.549
145.910
0
0 2.036 0
2011 PT Indonesia Power
36.655 25.600
37.936 26.672 17.011
29.225
0 0
43.227 31.940
12.594 9.905 4.341 3.229
02
2014 GWh 37.928 29.742 18.132 39.563 38.801 164.167
Pengiriman Energi ke Sistem Jawa Bali Tahun 2011-2015 (GWh) Energy Transferred to Java Bali System in 2011-2015 (GWh)
134.461
Grafik Graph
Tahun | Year 2013 GWh (%) 40.608 25,96 27.549 17,61 18.549 11,86 2.957 1,89 38.461 24,59 28.274 18,08 156.398 100
2012
38.461 28.274
05
Pengiriman Energi ke Sistem Jawa Bali Tahun 2011-2015 Energy Transferred to Java Bali System in 2011-2015
0
Tabel Table
Project
Sistem Jawa Bali | Java Bali System
SISTEM JAWA BALI JAVA BALI SYSTEM
LAPORAN STATISTIK STATISTIC REPORT
2015
21
2015
22
Tabel Table
06
SISTEM JAWA BALI JAVA BALI SYSTEM
LAPORAN STATISTIK STATISTIC REPORT
Realisasi Pengiriman Energi ke Sistem Jawa Bali Tahun 2014-2015 dan Rencana Tahun 2016 Realization of Energy Transferred to Java Bali System in 2014-2015 and Plan of 2016 Realisasi Realization (GWh)
Perusahaan Company
Rencana Plan (GWh)
Realisasi Realization (GWh)
2014
Pencapaian Achievement (%)
Rencana** Plan (GWh)
2015
Pertumbuhan (%) Growth
2016
2014
2015
PT Indonesia Power
37.928
39.701
38.129
104,12
36.215
(6,60)
0,53
PT PJB
29.742
28.638
25.485
112,37
23.462
7,96
(14,31)
UB Tanjung Jati B
18.132
19.477
17.507
111,25
19.208
(2,25)
(3,45)
IPP
39.563
43.260
41.275
104,81
45.344
2,87
4,33
UPJB
38.801
46.541
43.575
106,81
51.460
37,23
12,30
-
-
22
-
-
-
-
164.167
177.617
165.993
107,00
175.692
4,97
1,11
Project* Sistem Jawa Bali | Java Bali System Keterangan: * Penerimaan Tanjung Awar-awar unit 2 pada saat masih project ** Data Rencana menggunakan Rencana Operasi Tahunan (ROT)
PT PJB
175.692 36.215 23.462 19.208 45.344
UB Tanjung Jati
IPP
0
22
0 PT Indonesia Power
51.460
165.993
Realisasi | Realization 2015
38.129 25.485 17.507 41.275 43.575
164.167
Realisasi | Realization 2014
37.928
03
Realisasi Pengiriman Energi ke Sistem Jawa Bali Tahun 2014-2015 dan Rencana Tahun 2016 (GWh) Realization of Energy Transferred to Java Bali System in 2014-2015 and Plan of 2016 (GWh)
29.742 18.132 39.563 38.801
Grafik Graph
Note: * The acceptance of Tanjung Awar-awar unit 2 while in project period ** Data Plan based on Annual Operating Plan
Rencana | Plan 2016 UPJB
Project
Sistem Jawa Bali | Java Bali System
Daya Terpasang Installed Capacity
2015
24
LAPORAN STATISTIK STATISTIC REPORT
DAYA TERPASANG INSTALLED CAPACITY
DAYA TERPASANG INSTALLED CAPACITY Tabel Table
Daya Terpasang Pembangkit yang dimiliki Perusahaan Tahun 2011-2015 Installed Capacity of Units Owned by the Company in 2011-2015
07
Unit Pembangkit Generating Unit
2011 MW % 3.400,00 37,37 1.348,08 14,82 797,36 8,76 375,00 4,12 309,75 3,40 1.469,16 16,15 864,08 9,50 432,67 4,76 20,10 0,22 20,10 0,22 48,80 0,54 13,00 0,14 9.098,10 100,00
UP | GU SURALAYA *) UPJP | GGSU PRIOK *) UP | GU SAGULING *) UPJP | GGSU KAMOJANG *) UP | GU MRICA *) UP | GU SEMARANG *) UP | GU PERAK GRATI *) UPJP | GGSU BALI *) PLTG | GTPP KERAMASAN **) PLTG | GTPP JAMBI **) PLTG | GTPP INDRALAYA 1 **) PLTD | DPP PONTIANAK TOTAL
2012 MW % 3.400,00 37,62 1.348,08 14,92 797,36 8,82 375,00 4,15 309,74 3,43 1.408,93 15,59 864,08 9,56 432,67 4,79 20,10 0,22 20,10 0,22 48,80 0,54 13,00 0,14 9.037,86 100,00
*) Indonesia Power bertindak sebagai pemilik aset (asset owner) dan pengelola aset (asset manager dan asset operator) pembangkit tersebut **) Indonesia Power bertindak sebagai pemilik aset (asset owner) pembangkit tersebut sedangkan pengelola aset (asset manager dan asset operator) pembangkit dilakukan oleh Anak Perusahaan yaitu PT Cogindo DayaBersama Grafik Graph
2014 MW % 3.400,00 37,85 1.348,08 15,01 797,36 8,88 375,00 4,17 309,74 3,45 1.408,93 15,69 864,08 9,62 398.31 4,43 18,00 0,20 18,00 0,20 45,00 0,50 8.982,50 100,00
2015 MW 3.400,00 1.348,08 797,37 345,00 309,75 1.408,93 864,08 556,51 18,00 18,00 45,00 9.110,72
Daya Terpasang Pembangkit yang dimiliki Perusahaan Tahun 2011-2015 Installed Capacity of Units Owned by the Company in 2011-2015
2011
2012
UP | GU PERAK GRATI
2013
UPJP | GGSU BALI
2014
13,00 13,00 0 0 0
UP | GU SEMARANG
48,80 48,80 45,00 45,00 45,00
UP | GU MRICA
20,10 20,10 18,00 18,00 18,00
864,08 864,08 864,08 864,08 864,08 UPJP | GGSU KAMOJANG
20,10 20,10 18,00 18,00 18,00 UP | GU SAGULING
309,75 309,74 309,74 309,74 309,75
375,00 375,00 375,00 375,00 345,00
797,36 797,36 797,36 797,36 797,37 UPJP | GGSU PRIOK
432,67 432,67 432,67 398,31 556,51
1.469,16 1.408,93 1.408,93 1.408,93 1.408,93
1.348,08 1.348,08 1.348,08 1.348,08 1.348,08 UP | GU SURALAYA
% 37,32 14,80 8,75 3,79 3,40 15,46 9,48 6,11 0,20 0,20 0,49 100,00
*) Indonesia Power acted as the asset owner, asset manager and asset operator of the power plant **) Indonesia Power acted as the asset owner of the power plant while asset manager and asset operator of the power plant were conducted by subsidiaries namely PT Cogindo DayaBersama
3.400,00 3.400,00 3.400,00 3.400,00 3.400,00
04
2013 MW % 3.400,00 37,71 1.348,08 14,95 797,36 8,84 375,00 4,16 309,74 3,44 1.408,93 15,63 864,08 9,58 432.67 4,80 18,00 0,20 18,00 0,20 45,00 0,50 9.016,86 100,00
PLTG | GTPP KERAMASAN
PLTG | GTPP JAMBI
PLTG | GTPP INDRALAYA 1
PLTD | DPP PONTIANAK
2015
DAYA TERPASANG INSTALLED CAPACITY
2011
Unit Pembangkit Generating Unit UJP PLTU | SPP GSU BANTEN 1 SURALAYA UJP PLTU | SPP GSU BANTEN 2 LABUHAN UJP PLTU | SPP GSU BANTEN 3 LONTAR UJP PLTU | SPP GSU JAWA BARAT 2 PELABUHAN RATU UJP PLTU | SPP GSU JAWA TENGAH 2 ADIPALA PLTGU | CPP PRIOK BLOK 3 UJP PLTU | SPP GSU PANGKALAN SUSU PLTU | SPP SANGGAU PLTU | SPP BARRU PLTU | SPP JERANJANG PLTP | GPP ULUMBU TOTAL
MW 625,00 600,00 945,00 1.050,00 660,00 740,00 4.620,00
2012 % 13,53 12,99 20,45 22,73 14,29 16,02 100,00
MW 625,00 600,00 945,00 1.050,00 660,00 740,00 4.620,00
Indonesia Power bertindak sebagai pengelola aset (asset manager dan asset operator) pembangkit dimana pemilik aset (asset owner) pembangkit adalah PLN
% 13,53 12,99 20,45 22,73 14,29 16,02 100,00
2014
MW 625,00 600,00 945,00 1.050,00 660,00 740,00 400,00 14,00 100,00 25,00 5,00 5.178,00
% 12,07 11,59 18,25 20,28 12,75 14,29 7,72 0,27 1,93 0,48 0,10 100,00
MW 625,00 600,00 945,00 1.050,00 660,00 740,00 400,00 14,00 100,00 75,00 10,00 5.233,00
2015 % 11,94 11,47 18,06 20,06 12,61 14,14 7,64 0,27 1,91 1,43 0,19 100,00
MW 625,00 600,00 945,00 1.050,00 660,00 740,00 400,00 14,00 100,00 75,00 10,00 5.233,00
1.050,00 1.050,00 1.050,00 1.050,00 1.050,00 660,00 660,00 660,00 660,00 660,00
740,00 740,00 740,00 740,00 740,00 UJP PLTU | SPP GSU BANTEN 2 LABUHAN
UJP PLTU | SPP GSU BANTEN 3 LONTAR
UJP PLTU | SPP GSU JAWA BARAT 2 | WEST JAVA 2 PELABUHAN RATU
2011
UJP PLTU | SPP GSU JAWA TENGAH 2 CENTRAL JAVA 2 ADIPALA
2012
PLTGU | CPP PRIOK BLOK 3
2013
UJP PLTU | SPP GSU PANGKALAN SUSU
2014
PLTU | SPP SANGGAU
PLTU | SPP BARRU
2015
PLTU J | SPP J ERANJANG
5,00 10,00 10,00
0 0
0 0
14,00 14,00 14,00
25,00 75,00 75,00
100,00 100,00 100,00
400,00 400,00 400,00 0 0 UJP PLTU | SPP GSU BANTEN 1 SURALAYA
% 11,94 11,47 18,06 20,06 12,61 14,14 7,64 0,27 1,91 1,43 0,19 100,00
Indonesia Power acted as the asset manager and asset operator of the power plant while the asset owner of the power plant was PLN
945,00 945,00 945,00 945,00 945,00 600,00 600,00 600,00 600,00 600,00
05
25
Daya Terpasang Pembangkit yang Dikelola Perusahaan Tahun 2011-2015 (MW) Installed Capacity of Units Managed by the Company in 2011-2015 (MW)
625,00 625,00 625,00 625,00 625,00
Grafik Graph
2013
0 0
08
2015
Daya Terpasang Pembangkit yang Dikelola Perusahaan Tahun 2011-2015 Installed Capacity of Units Managed by the Company in 2011-2015
0 0
Tabel Table
LAPORAN STATISTIK STATISTIC REPORT
PLTP | GPP ULUMBU
2015
26
Tabel Table
09
DAYA TERPASANG INSTALLED CAPACITY
LAPORAN STATISTIK STATISTIC REPORT
Daya Terpasang Pembangkit Tahun 2015 Installed Capacity of Units in 2015 Mesin Pembangkit | Power Plant Unit Pembangkit Generating Unit
1
2
3
4
5
6
7
8
Jumlah | Total 9
10
11
12
Mesin Power
Kapasitas (MW) | Capacity (MW) Suralaya PLTU-B | SPP-C PLTU-B | SPP-C Priok PLTD-M | DPP-F PLTG-M | GTPP-F PLTGU-G | CPP-G PLTU-M | SPP-F Saguling PLTA | HPP PLTA | HPP PLTA | HPP PLTA | HPP PLTA | HPP PLTA | HPP PLTA | HPP PLTA | HPP Kamojang PLTP | GPP PLTP | GPP PLTP | GPP Mrica PLTA | HPP PLTA | HPP PLTA | HPP PLTA | HPP PLTA | HPP PLTA | HPP PLTA | HPP PLTA | HPP PLTA | HPP PLTA | HPP PLTA | HPP PLTA | HPP PLTA | HPP PLTA | HPP PLTA | HPP Semarang PLTGU-M | CPP-F PLTGU-G | CPP-G PLTU-M | SPP-F PLTG-M | GTPP-F PLTG-G | GTPP-G Perak Grati PLTGU-G | CPP-G PLTG-G | GTPP-G PLTU-M | SPP-F Bali PLTDG | GTDPP PLTG-M | GTPP-F PLTG-M | GTPP-F PLTG-M | GTPP-F JAWA BALI GRID & EMBEDDED
Tabel Table
10
PESANGGARAN TOTAL
400,00 400,00 400,00 400,00 600,00 600,00 600,00
Kebayoran Priok Priok Priok
2,52 3,00 2,52 2,52 2,52 3,00 26,00 26,00 130,00 130,00 130,00 200,00 130,00 130,00 130,00 200,00 50,00 50,00
Saguling Bengkok Plengan Lamajan Cikalong Ubrug Kracak Parakan Kondang
175,18 175,18 175,18 175,18 1,05 1,05 1,05 0,70 1,08 1,08 1,08 2,02 6,52 6,52 6,52 6,40 6,40 6,40 5,94 5,94 6,48 6,30 6,30 6,30 2,49 2,49 2,46 2,46
Kamojang Gunung Salak Darajad
60,00 55,00
PB. Sudirman Jelok Timo Wonogiri Garung Sempor Ketenger Wadaslintang Kedungombo Kelambu Pejengkolan Sidorejo Tapen Siteki Plumbungan
60,30 5,12 4,00 6,20 13,20 1,00 3,52 9,00 22,50 1,17 1,40 1,40 0,75 1,20 1,60
55,00 60,00
55,00 60,00
60,30 5,12 4,00 6,20 13,20
60,30 5,12 4,00
5,12
3,52 9,00
1,00
0,50
Tambaklorok Tambaklorok Tambaklorok Cilacap Sunyaragi
109,65 109,65 109,65 188,00 109,65 109,65 109,65 188,00 50,00 50,00 200,00 29,00 26,00 20,03
Grati Grati Perak
100,75 100,75 100,75 159,58 100,75 100,75 100,75 50,00 50,00
Pesanggaran Pesanggaran Gilimanuk Pemaron
16,64 21,35 133,80 48,80
16,64 20,10
16,64 42,00
16,64 42,00
1,61
16,64
16,64
16,64
16,64
16,64
16,64
16,64
16,64
48,80
7 4 3 18 6 2 8 2 29 4 4 5 3 3 3 3 4 6 2 3 1 28 3 4 3 2 2 1 4 2 1 1 1 1 1 1 1 14 4 4 3 2 1 9 4 3 2 19 12 4 1 2 130
3.400,00 1.600,00 1.800,00 1.348,08 16,08 52,00 1.180,00 100,00 797,37 700,72 3,85 6,87 19,56 19,20 18,36 18,90 9,90 345,00 110,00 180,00 55,00 309,75 180,90 20,49 12,00 12,40 26,40 1,00 8,54 18,00 22,50 1,17 1,40 1,40 0,75 1,20 1,60 1.408,93 516,95 516,95 300,00 55,00 20,03 864,08 461,83 302,25 100,00 556,51 199,66 125,45 133,80 97,60 9.029,72
Daya Terpasang Pembangkit dari Pembelian Tenaga Listrik Tahun 2011–2015 Installed Capacity of Units Owned by the Purchase of Electricity in 2011–2015
Unit Pembangkit Generating Unit
PEMARON
Suralaya 1 -4 Suralaya 5 -7
Daya Terpasang Installed Capacity
2011 MW 80,00
2012 %
MW
64,00
80,00
45,00
36,00
125,00
100,00
2013 %
MW
39,02
205,10
125,00
60,98
205,00
100,00
2014 %
MW
2015 % 66,74
MW
%
60,70
266,49
220,90
100,00
132,80
39,30
132,80
33,26
-
-
337,90
100,00
399,29
100,00
220,90
100,00
DAYA TERPASANG INSTALLED CAPACITY
LAPORAN STATISTIK STATISTIC REPORT
2015
27
Produksi, Penjualan dan Pemakaian Sendiri Production, Sales and Self Consumption
2015
28
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI PRODUCTION, SALES AND SELF CONSUMPTION
LAPORAN STATISTIK STATISTIC REPORT
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI PRODUCTION, SALES AND SELF CONSUMPTION
Realisasi | Realization
Uraian | Description
2011
Produksi | Production (GWh) Pertumbuhan Produksi | Production Growth (%) Penjualan | Sales (GWh) Pertumbuhan Penjualan | Sales Growth (%) Pemakaian Sendiri | Self Consumption (GWh)
2011
07
2015
45.446,57
39.954,76
42.624,17
39.876,15
39.730,12
(4,07)
(12,08)
6,68
(6,45)
(0,37)
43.553,96
38.314,55
40.917,38
38.300,02
38.011,11
(4,14)
(12,03)
6,79
(6,40)
(0,75)
1.892,61
1.632,21
1.698,97
1.568,70
1.718,37
2012
2013 Produksi/Production
Grafik Graph
2014
2014
39.730,12 38.011,11
39.954,76 38.314,55
06
2013
Produksi dan Penjualan Tahun 2011-2015 (GWh) Production and Sales in 2011-2015 (GWh) 45.446,57 43.553,96
Grafik Graph
2012
39.876,15 38.300,02
11
Pertumbuhan Produksi, Penjualan dan Pemakaian Sendiri Tahun 2011-2015 Production, Sales and Self Consumption Growth in 2011-2015
42.624,17 40.917,38
Tabel Table
2015
Penjualan/Sales
Pertumbuhan Produksi dan Penjualan Tahun 2011-2015 (%) Growth of Production and Sales in 2011-2015 (%)
9 6 3 0 -3 -6 -9 -12 -15
2011
2012
2013
Pertumbuhan Produksi | Production Growth
2014
2015
Pertumbuhan Penjualan | Sales Growth
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI PRODUCTION, SALES AND SELF CONSUMPTION
LAPORAN STATISTIK STATISTIC REPORT
2015
29
PRODUKSI PER UNIT PRODUCTION PER UNIT Tabel Table
12
Realisasi Produksi Tahun 2014-2015 dan Rencana Tahun 2016 Production Realization in 2014-2015 and Plan of 2016
Unit
Realisasi Realization (GWh)
Rencana Plan (GWh)
Realisasi Realization (GWh) 2015
2014 A. JAWA BALI GRID & EMBEDDED Suralaya
Pencapaian Achievement (%)
Rencana Plan (GWh)
Pertumbuhan Growth (%)
2016
2014
37.461,12
42.530,16
39.126,74
92,00
42.862,52
(1,70)
2015 4,45
22.596,76
23.208,00
23.528,45
101,38
22.336,07
1,08
4,12
Priok
3.819,14
4.346,59
3.434,65
79,02
3.528,81
(15,61)
(10,07)
Saguling
3.157,96
3.277,17
2.497,13
76,20
2.646,77
28,30
(20,93)
Kamojang
2.842,56
2.576,03
2.892,87
112,30
2.686,63
(2,64)
1,77
Semarang
346,71
3.340,30
2.562,61
76,72
5.553,68
14,37
639,12
Mrica
882,42
1.069,85
897,87
83,92
1.011,46
(8,37)
1,75
2.953,00
3.565,27
2.452,32
68,78
3.779,04
(14,08)
(16,96)
862,56
1.146,96
860,85
75,05
1.320,07
(24,65)
(0,20)
2.415,03
435,76
603,37
138,47
459,97
30,94
(75,02)
1.549,38
429,24
580,46
135,23
424,45
171,16
(62,54)
363,15
-
-
-
-
(52,69)
(100,00)
-
-
22,91
-
28,11
(100,00)
-
Keramasan
130,94
-
-
-
-
14,35
(100,00)
Jambi
115,88
-
-
-
-
(7,83)
(100,00)
Indralaya 1
255,68
-
-
-
-
3,32
(100,00)
-
6,52
-
-
7,42
-
-
39.876,15
42.965,92
39.730,12
92,47
43.322,50
(0,20)
(0,37)
Perak Grati Bali B. PEMBELIAN LISTRIK PURCHASE OF ELECTRICITY Pesanggaran Pemaron Nusa Penida
Karimunjawa INDONESIA POWER
2015
30
08
Realisasi Produksi Tahun 2014-2015 dan Rencana Tahun 2016 (GWh) Production Realization in 2014-2015 and Plan of 2016 (GWh)
PEMBELIAN LISTRIK | PURCHASE OF ELECTRICITY
0 22,91 28,11
130,94 0 0
115,88 0 0
255,68 0 0
0 0 7,42
Mrica
363,15 0 0
Semarang
1.549,38 580,46 424,45
Kamojang
862,56 860,85 1.320,07
882,42 897,87 1.011,46
Saguling
2.953,00 2.452,32 3.779,04
346,71 2.562,61 5.553,68
Priok
2.842,56 2.892,87 2.686,63
Suralaya
3.157,96 2.497,13 2.646,77
3.819,14 3.434,65 3.528,81
22.596,76 23.528,45 22.336,07
JAWA BALI GRID & EMBEDDED
39.876,15 39.730,12 43.322,50
Grafik Graph
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI PRODUCTION, SALES AND SELF CONSUMPTION
LAPORAN STATISTIK STATISTIC REPORT
Bali
Pesanggaran
Pemaron
Nusa Penida
Keramasan
Jambi
Indralaya 1
Karimunjawa
Perak Grati
Realisasi | Realization 2014
Grafik Graph
09
Realisasi | Realization 2015
INDONESIA POWER
Rencana| Plan 2016
Pertumbuhan Produksi Tahun 2014 dan Tahun 2015 (%) Production Growth in 2014 and 2015 (%)
JAWA BALI GRID & EMBEDDED
PEMBELIAN LISTRIK | PURCHASE OF ELECTRICITY
800 700 600 500 400 300 200 100 0 -100
Suralaya
Priok
Saguling
Kamojang Semarang
Mrica
Perak Grati
Bali
Pertumbuhan Produksi 2014 | Production Growth 2014
Pesanggaran Pemaron Nusa Penida Keramasan
Jambi
Indralaya 1 Karimunjawa INDONESIA POWER
Pertumbuhan Produksi 2015 | Production Growth 2015
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI PRODUCTION, SALES AND SELF CONSUMPTION
Tabel Table
2015
LAPORAN STATISTIK STATISTIC REPORT
31
Produksi Per Unit Tahun 2015 Production Per Unit in 2015
13
Triwulan | Quarterly Unit
TW I
TW II
TW III
2015
TW IV
Produksi (GWh) | Production (GWh) A. JAWA BALI GRID & EMBEDDED Suralaya
9.035,99
9.943,04
9.608,69
10.539,02
39.126,74
5.057,38
5.967,31
6.247,05
6.256,71
23.528,45
883,13
936,04
705,14
910,35
3.434,65
Priok Saguling
936,78
703,57
347,06
509,71
2.497,13
Kamojang
737,12
713,95
759,55
682,25
2.892,87
Semarang
300,26
281,23
677,25
1.303,87
2.562,61
Mrica
351,71
306,97
83,77
155,42
897,87 2.452,32
Perak Grati
521,11
647,56
662,85
620,80
Bali
248,51
386,41
126,02
99,91
860,85
308,34
202,79
73,07
19,18
603,37
Pesanggaran
308,34
192,19
67,16
12,78
580,46
Nusa Penida
-
10,60
5,91
6,40
22,91
B. PEMBELIAN LISTRIK | ELECTRICITY PURCHASE
Karimunjawa INDONESIA POWER
-
-
-
-
-
9.344,33
10.145,83
9.681,76
10.558,20
39.730,12
Produksi Per Unit Tahun 2015 Production Per Unit in 2015
60,13%
8,78%
Suralaya
Priok
6,55%
2,29%
Semarang
Mrica
6,38%
7,39%
6,27%
2,20%
Saguling
Perak Grati
Kamojang
Bali
2015
32
PEMBELIAN LISTRIK PURCHASE OF ELECTRICITY
JAWA BALI GRID & EMBEDDED
9.344,33 10.145,83 9.681,76 10.558,20
Produksi Per Unit Tahun 2015 (GWh) Production Per Unit in 2015 (GWh)
Mrica
TW I
TW II
Perak Grati
TW III
Bali
0 0 0 0
Semarang
0 10,60 5,91 6,40
351,71 306,97 83,77 155,42
Kamojang
308,34 192,19 67,16 12,78
300,26 281,23 677,25 1.303,87
Saguling
248,51 386,41 126,02 99,91
737,12 713,95 759,55 682,25
Priok
521,11 647,56 662,85 620,80
936,78 703,57 347,06 509,71
Suralaya
883,13 936,04 705,14 910,35
10
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI PRODUCTION, SALES AND SELF CONSUMPTION
5.057,38 5.967,31 6.247,05 6.256,71
Grafik Graph
LAPORAN STATISTIK STATISTIC REPORT
Pesanggaran Nusa Penida Karimunjawa INDONESIA POWER
TW IV
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI PRODUCTION, SALES AND SELF CONSUMPTION
LAPORAN STATISTIK STATISTIC REPORT
2015
33
PENJUALAN PER UNIT SALES PER UNIT
14
Realisasi Penjualan Tahun 2014-2015 dan Rencana Tahun 2016 Sales Realization in 2014-2015 and Plan of 2016 Realisasi Realization (GWh)
Unit
Rencana Plan (GWh)
Grafik Graph
11
Pencapaian Achievement (%)
Rencana Plan (GWh)
2015
2014 A. JAWA BALI GRID & EMBEDDED Suralaya Priok Saguling Kamojang Semarang Mrica Perak Grati Bali B. PEMBELIAN LISTRIK | PURCHASE OF ELECTRICITY Pesanggaran Pemaron Nusa Penida Keramasan Jambi Indralaya 1 Karimunjawa INDONESIA POWER
Realisasi Realization (GWh)
35.892,42 21.374,64 3.743,78 3.150,71 2.709,00 323,03 868,66 2.872,48 850,11 2.407,60 1.549,38 363,15 129,73 113,66 251,69 38.300,02
40.668,55 21.916,78 4.242,24 3.265,70 2.451,54 3.188,06 1.052,59 3.462,70 1,088,95 435,76 429,24 6,52 41.104,31
Pertumbuhan Growth (%)
2016
37.408,37 22.206,08 3.366,03 2.490,67 2.759,19 2.477,34 883,11 2.382,01 843,94 602,74 579,83 22,91 38.011,11
91,98 101,32 79,35 76,27 112,55 77,71 83,90 68,79 77,50 138,32 135,08 92,47
2014
40.944,38 21.076,25 3.450,38 2.637,34 2.556,18 5.303,15 993,63 3.667,45 1.260,00 459,97 424,45 28,11 7,42 41.404,35
(1,61) 1,20 (15,49) 28,34 (2,84) 21,29 (8,29) (14,18) (24,37) 31,10 171,16 (52,69) 14,52 (7,89) 3,56 (0,04)
Realisasi Penjualan Tahun 2014-2015 dan Rencana Tahun 2016 (GWh) Sales Realization in 2014-2015 and Plan of 2016 (GWh)
38.300,02 38.011,11 41.404,35
Tabel Table
PEMBELIAN LISTRIK | PURCHASE OF ELECTRICITY
Realisasi | Realization 2014
Perak Grati
Realisasi | Realization 2015
Nusa Penida Keramasan
Jambi
Rencana | Plan 2016
0 0 7,42
251,69 0 0
Pemaron
113,66 0 0
Pesanggaran
129,73 0 0
Bali
0 22,91 28,11
Mrica
363,15 0 0
Semarang
1.549,38 579,83 424,45
Kamojang
850,11 843,94 1.260,00
868,66 883,11 993,63
Saguling
2.872,48 2.382,01 3.667,45
323,03 2.477,34 5.303,15
Priok
2.709,00 2.759,19 2.556,18
Suralaya
3.150,71 2.490,67 2.637,34
3.743,78 3.366,03 3.450,38
21.374,64 22.206,08 21.076,25
JAWA BALI GRID & EMBEDDED
Indralaya 1 Karimunjawa INDONESIA POWER
2015 4,22 3,89 (10,09) (20,95) 1,85 666,91 1,66 (17,07) (0,73) (74,97) (62,58) (100,00) (100,00) (100,00) (100,00) (0,75)
2015
34
Grafik Graph
12
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI PRODUCTION, SALES AND SELF CONSUMPTION
LAPORAN STATISTIK STATISTIC REPORT
Pertumbuhan Penjualan Tahun 2014 dan Tahun 2015 (%) Sales Growth in 2014 and 2015 (%) JAWA BALI GRID & EMBEDDED
PEMBELIAN LISTRIK | PURCHASE OF ELECTRICITY
800 700 600 500 400 300 200 100 0 -100 Suralaya
Priok
Saguling
Kamojang
Semarang
Mrica
Perak Grati
Bali
Pesanggaran Pemaron Nusa Penida Keramasan
Pertumbuhan Produksi 2014 | Production Growth 2014
Tabel Table
15
Jambi
Indralaya 1 Karimunjawa INDONESIA POWER
Pertumbuhan Produksi 2015 | Production Growth 2015
Penjualan Per Unit Tahun 2015 Sales Per Unit in 2015 Triwulan | Quarterly Unit
TW I
TW II
TW III
2015
TW IV
Penjualan (GWh) | Sales (GWh) A. JAWA BALI GRID & EMBEDDED Suralaya
8.637,90
9.507,65
9.172,43
10.090,39
37.408,37
4.747,35
5.624,54
5.908,27
5.925,92
22.206,08
Priok
865,90
917,49
688,74
893,91
3.366,03
Saguling
934,83
701,89
345,76
508,19
2.490,67
Kamojang
702,90
681,13
724,84
650,32
2.759,19
Semarang
291,67
271,55
658,13
1.255,99
2.477,34
Mrica
346,06
302,07
82,09
152,90
883,11
Perak Grati
502,94
628,25
643,74
607,08
2.382,01
Bali
246,26
380,73
120,86
96,09
843,94
B. PEMBELIAN LISTRIK | PURCHASE OF ELECTRICITY Pesanggaran Nusa Penida INDONESIA POWER
308,33
213,38
68,15
12,88
602,74
308,33
202,78
62,24
6,48
579,83
-
10,60
5,91
6,40
22,91
8.946,23
9.721,03
9.240,58
10.103,27
38.011,11
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI PRODUCTION, SALES AND SELF CONSUMPTION
13
2015
35
Penjualan Per Unit Tahun 2015 (GWh) Sales Per Unit in 2015 (GWh) PEMBELIAN LISTRIK PURCHASE OF ELECTRICITY
Perak Grati
TW I
TW II
0 10,60 5,91 6,40
Mrica
308,33 202,78 62,24 6,48
Semarang
246,26 380,73 120,86 96,09
Kamojang
502,94 628,25 643,74 607,08
702,90 681,13 724,84 650,32
Saguling
346,06 302,07 82,09 152,90
934,83 701,89 345,76 508,19
Priok
Suralaya
291,67 271,55 658,13 1.255,99
865,90 917,49 688,74 893,91
4.747,35 5.624,54 5.908,27 5.925,92
JAWA BALI GRID & EMBEDDED
8.946,23 9.721,03 9.240,58 10.103,27
Grafik Graph
LAPORAN STATISTIK STATISTIC REPORT
Bali
Pesanggaran
Nusa Penida
TW III
TW IV
INDONESIA POWER
Penjualan Per Unit Tahun 2015 Sales Based on Unit in 2015
59,36%
9,00%
Suralaya
Priok
6,62%
2,36%
Semarang
Mrica
6,66%
7,38%
6,37%
2,26%
Saguling
Perak Grati
Kamojang
Bali
2015
36
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI PRODUCTION, SALES AND SELF CONSUMPTION
LAPORAN STATISTIK STATISTIC REPORT
PEMAKAIAN SENDIRI PER UNIT SELF CONSUMPTION PER UNIT Tabel Table
16
Realisasi Pemakaian Sendiri Tahun 2014-2015 dan Rencana Tahun 2016 Self Consumption Realization in 2014-2015 and Plan of 2016 Realisasi Realization
Unit
(GWh)
Rencana Plan
(%)
(GWh)
Realisasi Realization (%)
(GWh)
Pencapaian Achievement (%)
(%)
Rencana Plan (GWh)
2015
2014
(%) 2016
JAWA BALI GRID & EMBEDDED
1.568,70
4,19
1.861,61
4,38
1.718,37
4,39
92,31
1.918,15
4,53
Suralaya
1.222,12
5,41
1.291,22
5,56
1.322,37
5,62
102,41
1.259,83
5,64
75,36
1,97
104,35
2,40
68,62
2,00
65,76
78,43
2,22
7,24
0,23
11,47
0,35
6,46
0,26
56,32
9,42
0,36
Kamojang
133,57
4,70
124,49
4,83
133,68
4,62
107,39
130,44
4,86
Semarang
23,69
6,83
152,24
4,56
85,27
3,33
56,01
250,53
4,51
Mrica
13,76
1,56
17,26
1,61
14,75
1,64
85,50
17,83
1,76
Perak Grati
80,52
2,73
102,58
2,88
70,31
2,87
68,54
111,59
2,95
Bali
12,45
1,44
58,01
5,06
16,91
1,96
29,14
60,08
4,55
1.568,70
4,19
1.861,61
4,38
1.718,37
4,39
92,31
1.918,15
4,53
Priok Saguling
INDONESIA POWER
6,83 Suralaya
Priok
4,53
4,39
4,19
4,55 2,95
2,87
1,96 1,44
1,76
1,64
0,36
0,26
0,23
1,56
2,22
2,00
1,97
2,73
3,33
4,51
4,86
4,70
4,62
5,62
5,64
14
Realisasi Pemakaian Sendiri Tahun 2014-2015 dan Rencana Tahun 2016 (%) Self Consumption Realization in 2014-2015 and Plan of 2016 (%)
5,41
Grafik Graph
Saguling
Kamojang
Realisasi | Realization 2014
Semarang
Mrica
Realisasi Realization 2015
Perak Grati
Bali
Rencana | Plan 2016
INDONESIA POWER
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI PRODUCTION, SALES AND SELF CONSUMPTION
Tabel Table
17
LAPORAN STATISTIK STATISTIC REPORT
2015
37
Pemakaian Sendiri Per Unit Tahun 2015 Self Consumption Per Unit in 2015 Triwulan | Quarterly Unit
TW I (GWh)
JAWA BALI GRID & EMBEDED
398,09
Suralaya
TW II (%)
(GWh)
(%)
4,41
435,39
310,03
6,13
17,23
1,95
Saguling
1,96
Kamojang Semarang
Priok
Mrica Perak Grati Bali INDONESIA POWER
(%)
(GWh)
4,38
436,26
342,77
5,74
18,55
1,98
0,21
1,68
0,24
34,22
4,64
32,81
4,60
34,71
4,57
8,59
2,86
9,68
3,44
19,12
2,82
(%)
4,54
448,63
338,78
5,42
16,39
2,32
1,30
0,37
(GWh) 1.718,37
330,79
5,29
1.322,37
5,62
16,44
1,81
68,62
2,00
1,52
0,30
6,46
0,26
31,93
4,68
133,68
4,62
47,88
3,67
85,27
3,33
5,65
1,61
4,90
1,60
1,68
2,01
2,52
1,62
14,75
1,64
3,49
19,31
2,98
19,11
2,88
13,72
2,21
70,31
2,87
2,24
0,90
5,68
1,47
5,16
4,09
3,82
3,82
16,91
1,96
398,09
4,41
435,39
4,38
436,26
4,54
448,63
4,26
1.718,37
4,39
4,41 4,38 4,54 4,26
4,09 3,82 2,88 2,21 0,90
1,47
1,62
1,61 1,60 2,01
3,49 2,98
2,86 3,44 2,82 3,67
4,64
4,60 4,57 4,68
0,21 0,24 0,37 0,30 Priok
Saguling
Kamojang
TW I
Semarang
TW II
Mrica
TW III
Perak Grati
Bali
INDONESIA POWER
TW IV
Pemakaian Sendiri Per Unit Tahun 2015 Self Consumption Per Unit in 2015
76,96% Suralaya
4,96% Semarang
4,39
18,17
1,81
1,95 1,98 2,32 Suralaya
(%)
4,26
5,29
15
(GWh)
2015
TW IV
Pemakaian Sendiri Per Unit Tahun 2015 (%) Self Consumption Per Unit in 2015 (%) 6,13 5,74 5,42
Grafik Graph
TW III
3,99%
0,38% Saguling
7,78%
Priok
0,86%
4,09%
0,98%
Mrica
Perak Grati
Kamojang
Bali
2015
38
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI PRODUCTION, SALES AND SELF CONSUMPTION
LAPORAN STATISTIK STATISTIC REPORT
PRODUKSI PER JENIS PEMBANGKIT PRODUCTION PER POWER PLANT TYPE
Realisasi Realization (GWh)
Jenis Pembangkitan Power Plant Type
Realisasi Realization (GWh)
Rencana Plan (GWh)
37.461,12 22.596,76 22.596,76 1.085,79 222,74 863,06 6.887,14 6.605,99 281,15 8,48 2.842,56 4.040,38 2.415,03 1.912,53 502,50 39.876,15
42.530,16 23.816,86 23.208,00 205,24 403,62 717,51 373,58 343,93 10.251,80 9.270,04 981,76 2.576,03 4.347,02 820,95 820,95 435,76 429,24 6,52 42.965,92
39.126,74 23.528,45 23.528,45 615,73 172,05 443,68 8.271,98 8.242,04 29,94 0,02 2.892,87 3.395,00 422,69 120,13 302,55 603,37 603,37 39.730,12
92,00 98,79 101,38 85,81 46,05 129,00 80,69 88,91 3,05 112,30 78,10 51,49 14,63 138,47 140,57 92,47
Pertumbuhan Growth (%)
2016
2014
2015
42.862,52 22.948,75 22.336,07 612,67 405,35 383,04 22,31 11.862,48 11.815,11 47,37 2.686,63 3.658,23 1.301,10 1.258,34 42,75 459,97 452,55 7,42 43.322,50
(1,70) 0,56 1,08 (100,00) (7,41) 70,11 (17,15) (13,93) 3,11 (82,37) (92,99) (2,64) 17,98 (100,00) (100,00) 30,94 40,97 3,03 (0,20)
4,45 4,12 4,12 (43,29) (22,76) (48,59) 20,11 24,77 (89,35) (99,74) 1,77 (15,97) (75,02) (68,45) (100,00) (0,37)
43.322,50
39.876,15 PLTG GTPP
PLTD DPP
Realisasi | Realization 2014
PLTA HPP
PLTDG GTDPP
Realisasi | Realization 2015
PLTD DPP
PLTG GTPP Rencana | Plan 2016
0 0 7,42
502,50 0 0
1.301,10
0 PLTP GPP
422,69
3.658,23
4.040,38 3.395,00
2.842,56
8,48 0,02 0 PLTGU CPP
2.892,87 2.686,63
11.862,48
8.271,98
6.887,14
1.085,79 PLTU SPP
615,73 405,35
23.528,45
39.730,12
PEMBELIAN LISTRIK PURCHASE OF ELECTRICITY
JAWA BALI GRID & EMBEDDED
22.948,75
16
Rencana Plan (GWh)
Realisasi Produksi Per Jenis Pembangkit Tahun 2014-2015 dan Rencana Tahun 2016 (GWh) Production Realization Per Power Plant Type in 2014-2015 and Plan of 2016 (GWh)
22.596,76
Grafik Graph
Pencapaian Achievement (%)
2015
2014 A. JAWA BALI GRID & EMBEDDED PLTU | SPP PLTU (batu bara) | Coal-fired SPP PLTU (Gas) | Gas SPP PLTU (MFO) | MFO SPP PLTG | GTPP PLTG (Gas) | Gas GTPP PLTG (HSD) | HSD GTPP PLTGU | CPP PLTGU (Gas) | Gas CPP PLTGU (HSD) | HSD CPP PLTD | DPP PLTP | GPP PLTA | HPP PLTDG | GTDPP PLTDG (Gas) | Gas GTDPP PLTDG (MFO) | MFO GTDPP PLTDG (HSD) | HSD GTDPP B. PEMBELIAN LISTRIK | PURCHASE OF ELECTRICITY PLTD | DPP PLTG | GTPP PLTMG | GTMPP INDONESIA POWER
1.912,53
18
Realisasi Produksi Per Jenis Pembangkit Tahun 2014-2015 dan Rencana Tahun 2016 Production Realization Per Power Plant Type in 2014-2015 and Plan of 2016
603,37 452,55
Tabel Table
PLTMG GTMPP
INDONESIA POWER
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI PRODUCTION, SALES AND SELF CONSUMPTION
Grafik Graph
17
LAPORAN STATISTIK STATISTIC REPORT
2015
39
Pertumbuhan Produksi Per Jenis Pembangkit Tahun 2014 dan Tahun 2015 (%) Production Growth Per Power Plant Type in 2014 and 2015 (%) PEMBELIAN LISTRIK PURCHASE OF ELECTRICITY
JAWA BALI GRID & EMBEDDED 60 40 20
PLTD DPP
PLTGU CPP
PLTU SPP
PLTP| GPP
0
PLTG GTPP
PLTA HPP
PLTMG GTMPP
INDONESIA POWER
-20 -40 -60
PLTD DPP
PLTG GTPP
-80
PLTD DPP
-100
GTDPP
Pertumbuhan Produksi 2014 | Production Growth 2014
Tabel Table
19
PLTG GTPP
PLTDG
Pertumbuhan Produksi 2015 | Production Growth 2015
Produksi Per Jenis Pembangkit Tahun 2015 Production Per Power Plant Type in 2015
Jenis Pembangkitan Power Plant Type A. JAWA BALI GRID & EMBEDDED PLTU | SPP PLTU (batu bara) | Coal-fired SPP PLTG | GTPP PLTG (Gas) | Gas GTPP PLTG (HSD) | HSD GTPP PLTGU | CPP PLTGU (Gas) | Gas CPP PLTGU (HSD) | HSD CPP PLTD | DPP PLTP | GPP PLTA | HPP PLTDG | GTDPP PLTDG (MFO) | MFO GTDPP PLTDG (HSD) | HSD GTDPP B. PEMBELIAN LISTRIK | PURCHASE OF ELECTRICITY PLTD | DPP INDONESIA POWER
Triwulan | Quarterly TW I
TW II
TW III
TW IV
2015
Produksi (GWh) | Production (GWh) 9.035,99 5.057,38 5.057,38 254,78 8,99 245,79 1.695,47 1.694,44 1,03 0,004 737,12 1.288,49 2,74 2,74 308,34 308,34 9.344,33
9.943,04 5.967,31 5.967,31 186,55 30,95 155,59 1.833,87 1.831,46 2,41 0,01 713,95 1.010,54 230,82 58,39 172,43 202,79 202,79 10.145,83
9.608,69 6.247,05 6.247,05 61,10 49,62 11,48 1.995,61 1.989,43 6,18 759,55 430,84 114,54 5,95 108,59 62,47 62,47 9.671,16
10.539,02 6.256,71 6.256,71 113,30 82,48 30,81 2.747,04 2.726,71 20,33 0,01 682,25 665,13 74,59 53,05 21,53 29,78 29,78 10.568,80
39.126,74 23.528,45 23.528,45 615,73 172,05 443,68 8.271,98 8.242,04 29,94 0,02 2.892,87 3.395,00 422,69 120,13 302,55 603,37 603,37 39.730,12
2015
40
10.145,83
9.344,33
TW I
TW II
PLTA HPP
TW III
665,13
430,84
1.288,49 1.010,54
682,25
PLTP GPP
308,34 202,79 62,47 29,78
PLTD DPP
737,12 713,95 759,55
0,004 0,01 0 0,01 PLTGU CPP
2,74 230,82 114,54 74,59
PLTG GTPP
2.747,04
1.833,87 1.995,61
61,10 113,30
254,78 186,55
1.695,47
6.247,05
PLTU SPP
9.671,16 10.568,80
PEMBELIAN LISTRIK PURCHASE OF ELECTRICITY
JAWA BALI GRID & EMBEDDED
6.256,71
18
Produksi Per Jenis Pembangkit Tahun 2015 (GWh) Production Per Power Plant Type in 2015 (GWh)
5.057,38 5.967,31
Grafik Graph
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI PRODUCTION, SALES AND SELF CONSUMPTION
LAPORAN STATISTIK STATISTIC REPORT
PLTDG
PLTD DPP
GTDPP
INDONESIA POWER
TW IV
Produksi Per Jenis Pembangkit Tahun 2015 Production Per Power Plant Type in 2015
8,77% PLTA HPP
7,47% PLTP GPP
0%
1,59%
60,79%
21,37%
PLTD DPP
PLTU SPP
PLTG GTPP
PLTGU CPP
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI PRODUCTION, SALES AND SELF CONSUMPTION
LAPORAN STATISTIK STATISTIC REPORT
2015
41
PENJUALAN PER JENIS PEMBANGKIT SALES PER POWER PLANT TYPE
Realisasi Realization (GWh)
Jenis Pembangkitan Power Plant Type
Rencana Plan (GWh)
Realisasi Realization (GWh)
40.668,55 22.483,02 21.916,78 190,87 375,37 705,87 369,84 336,02 9.939,70 8.994,07 945,64 2.451,54 4.318,29 770,13 770,13 435,76 429,24 6,52 41.104,31
2016
37.408,37 22.201,18 22.206,08 (4,90) 606,35 171,00 435,36 8.054,36 8.028,26 26,10 0,01 2.759,19 3.373,79 413,40 117,27 296,13 602,74 602.74 38.011,11
91,98 98,75 101,32 85,90 46,23 129,56 81,03 89,26 2,76 112,55 78,13 53,68 15,23 138,32 140,42 92,47
40.944,38 21.646,03 21.076,25 569,79 400,95 379,21 21,75 11.468,78 11.423,71 45,06 2.556,18 3.630,97 1.241,46 1.200,66 40,79 459,97 452,55 7,42 41.404,35
Pertumbuhan Growth (%) 2014
2015
(1,61) 0,73 1,20 (106,20) (6,36) 70,38 (16,21) (14,10) 2,90 (82,93) (93,45) (2,84) 18,14 (100,00) (100,00) 31,10 40,97 3,20 (0,04)
4,22 3,89 3,89 0,00 (43,38) (22,86) (48,73) 19,91 24,42 (90,13) (99,89) 1,85 (16,06) (74,97) (68,48) (100,00) (0,75)
38.300,02 38.011,11
Realisasi | Realization 2014
PLTA HPP
0 0 7,42
0
3.373,79 3.630,97
4.019,37
2.556,18
2.759,19
PLTP GPP
495,08 0 0
PLTD DPP
2.709,00
7,31 0,01 0
8.054,36 11.468,78
PLTGU CPP
1.912,53 602,74 452,55
PLTG GTPP
6.716,87
400,95
1.070,86
606,35
22.201,18
PLTU SPP
41.404,35
PEMBELIAN LISTRIK PURCHASE OF ELECTRICITY
JAWA BALI GRID & EMBEDDED
21.646,03
19
35.892,42 21.368,90 21.374,64 (5,74) 1.070,86 221,67 849,18 6.716,87 6.452,45 264,42 7,31 2.709,00 4.019,37 2.407,60 1.912,53 495,08 38.300,02
Rencana Plan (GWh)
Realisasi Penjualan Per Jenis Pembangkit Tahun 2014-2015 dan Rencana Tahun 2016 (GWh) Sales Realization Per Power Plant Type in 2014-2015 and Plan of 2016 (GWh)
21.368,90
Grafik Graph
Pencapaian Achievement (%)
2015
2014 A. JAWA BALI GRID & EMBEDDED PLTU | SPP PLTU (batu bara) | Coal-fired SPP PLTU (Gas) | Gas SPP PLTU (MFO) | MFO SPP PLTG | GTPP PLTG (Gas) | Gas GTPP PLTG (HSD) | HSD GTPP PLTGU | CPP PLTGU (Gas) | Gas CPP PLTGU (HSD) | HSD CPP PLTD | DPP PLTP | GPP PLTA | HPP PLTDG | GTDPP PLTDG (Gas) | Gas GTDPP PLTDG (MFO) | MFO GTDPP PLTDG (HSD) | HSD GTDPP B. PEMBELIAN LISTRIK | PURCHASE OF ELECTRICITY PLTD | DPP PLTG | GTPP PLTMG | GTMPP INDONESIA POWER
1,241,46
20
Realisasi Penjualan Per Jenis Pembangkit Tahun 2014-2015 dan Rencana Tahun 2016 Sales Realization Per Power Plant Type in 2014-2015 and Plan of 2016
413,40
Tabel Table
PLTD DPP
PLTG GTPP
PLTMG GTMPP
PLTDG GTDPP
Realisasi | Realization 2015
Rencana | Plan 2016
INDONESIA POWER
2015
42
Grafik Graph
20
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI PRODUCTION, SALES AND SELF CONSUMPTION
LAPORAN STATISTIK STATISTIC REPORT
Pertumbuhan Penjualan Per jenis Pembangkit Tahun 2014-2015 (%) Sales Growth Per Power Plant Type in 2014 and 2015 (%) PEMBELIAN LISTRIK PURCHASE OF ELECTRICITY
JAWA BALI GRID & EMBEDDED 60
PLTD DPP
40 20 0 -20
PLTGU CPP PLTP GPP
PLTU SPP
PLTMG GTMPP
PLTA HPP PLTG GTPP
PLTGU CPP
-40
PLTD DPP
-60
PLTG GTPP
-80 PLTD DPP
-100
PLTDG GTDPP
Pertumbuhan Produksi 2014 | Production Growth 2014
Tabel Table
21
INDONESIA POWER
PLTG GTPP
Pertumbuhan Produksi 2015 | Production Growth 2015
Penjualan Per Jenis Pembangkit Tahun 2015 Sales Per Power Plant Type in 2015
Jenis Pembangkitan Power Plant Type A. JAWA BALI GRID & EMBEDDED PLTU | SPP PLTU (batu bara) | Coal-fired SPP PLTU (Gas) | Gas SPP PLTU (MFO) | MFO SPP PLTG | GTPP PLTG (Gas) | Gas GTPP PLTG (HSD) | HSD GTPP PLTGU | CPP PLTGU (Gas) | Gas CPP PLTGU (HSD) | HSD CPP PLTD | DPP PLTP | GPP PLTA | HPP PLTDG | GTDPP PLTDG (MFO) | MFO GTDPP PLTDG (HSD) | HSD GTDPP B. PEMBELIAN LISTRIK | PURCHASE OF ELECTRICITY PLTD | DPP INDONESIA POWER
Triwulan | Quarterly TW I
TW II
TW III
TW IV
2015
Produksi (GWh) | Production (GWh) 8.637,90 4.746,29 4.747,35 (1,05) 252,35 8,72 243,63 1.652,97 1.653,94 (0,96) 0,001 702,90 1.280,89 2,48 2,48 308,33 308,33 8.946,23
9.507,65 5.623,43 5.624,54 (1,11) 183,99 30,67 153,32 1.787,85 1.785,98 1,87 0,002 681,13 1.003,95 227,26 57,61 169,65 202,78 202,78 9.710,43
9.172,43 5.906,98 5.908,27 (1,29) 58,91 49,35 9,56 1.942,68 1.937,11 5,57 724,84 427,86 111,15 5,46 105,69 62,24 62,24 9.234,68
10.090,39 5.924,47 5.925,92 (1,44) 111,11 82,26 28,85 2.670,86 2.651,24 19,62 0,00 650,32 661,09 72,52 51,73 20,79 29,39 29,39 10.119,77
37.408,37 22.201,18 22.206,08 (4,90) 606,35 171,00 435,36 8.054,36 8.028,26 26,10 0,008 2,759,19 3.373,79 413,40 117,27 296,13 602,74 602,74 38.011,11
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI PRODUCTION, SALES AND SELF CONSUMPTION
43
8.946,23 9.710,43
TW I
PLTP GPP
PLTA HPP
TW II
TW III
308,33 202,78 62,24 29,39
PLTD DPP
2,48 227,26 111,15 72,52
0,001 0,002 0 0,002 PLTGU CPP
1.280,89 1.003,95 427,86 661,09
PLTG GTPP
702,90 681,13 724,84 650,32
1.787,85 1.942,68 2.670,86
1.652,97
5.924,47 252,35 183,99 58,91 111,11
PLTU SPP
9.234,68 10.119,77
PEMBELIAN LISTRIK PURCHASE OF ELECTRICITY
JAWA BALI GRID & EMBEDDED
5.623,43 5.906,98
21
2015
Penjualan Per Jenis Pembangkit Tahun 2015 (GWh) Sales Per Power Plant Type in 2015 (GWh)
4.746,29
Grafik Graph
LAPORAN STATISTIK STATISTIC REPORT
PLTDG GTDPP
PLTD DPP
INDONESIA POWER
TW IV
Penjualan Per Jenis Pembangkit Tahun 2015 Sales Per Power Plant Type in 2015
9,12%
0%
PLTA HPP
PLTD DPP
7,46%
60,01%
PLTP GPP
PLTU SPP
1,64% PLTG GTPP
21,77% PLTGU CPP
2015
44
LAPORAN STATISTIK STATISTIC REPORT
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI PRODUCTION, SALES AND SELF CONSUMPTION
PEMAKAIAN SENDIRI PER JENIS PEMBANGKIT SELF CONSUMPTION PER POWER PLANT TYPE Tabel Table
22
Realisasi Pemakaian Sendiri Per Jenis Pembangkit Tahun 2014-2015 dan Rencana Tahun 2016 Self Consumption Realization Per Power Plant Type in 2014-2015 and Plan of 2016
Jenis Pembangkitan Power Plant Type
Realisasi Realization (GWh) (%)
Rencana Plan (GWh) (%) 2015
2014 A. JAWA BALI GRID & EMBEDDED PLTU | SPP PLTU (batu bara) | Coal-fired SPP PLTU (Gas) | Gas SPP PLTU (MFO) | MFO SPP PLTG | GTPP PLTG (Gas) | Gas GTPP PLTG (HSD) | HSD GTPP PLTGU | CPP PLTGU (Gas) | Gas CPP PLTGU (HSD) | HSD CPP PLTD | DPP PLTP | GPP PLTA | HPP PLTDG | GTDPP PLTDG (Gas) | Gas GTDPP PLTDG (MFO) | MFO GTDPP PLTDG (HSD) | HSD GTDPP INDONESIA POWER
1.568,70 1.227,86 1.222,12 5,74 14,94 1,06 13,88 170,27 153,55 16,73 1,17 133,57 21,00 1.568,70
Realisasi Realization (GWh) (%)
4,19 5,43 5,41 1,38 0,48 1,61 2,47 2,32 5,95 13,84 4,70 0,52 4,19
1.861,61 1.333,84 1.291,22 14,37 28,25 11,65 3,74 7,91 312,10 275,98 36,12 124,49 28,72 50,82 50,82 1.861,61
4,38 5,60 5,56 7,00 1,62 1,00 2,30 3,04 2,98 3,68 4,83 0,66 6,19 6,19 4,38
1.718,37 1.327,27 1.322,37 4,90 9,38 1,05 8,32 217,63 213,78 3,85 0,01 133,68 21,21 9,28 2,86 6,42 1.718,37
4,39 5,64 5,62 1,52 0,61 1,88 2,63 2,59 12,84 62,71 4,62 0,62 2,20 2,38 2,12 4,39
Pencapaian Achievement (%) 92,31 99,51 102,41 80,51 28,20 105,22 69,73 77,46 10,65 107,39 73,85 18,27 5,63 92,31
Rencana | Plan (GWh)
(%)
2016 1.918,15 1.302,71 1.259,83 42,89 4,39 3,83 0,56 393,70 391,40 2,31 130,44 27,26 59,64 57,68 1,96 1.918,15
4,53 5,68 5,64 7,00 1,08 1,00 2,53 3,32 3,31 4,87 4,86 0,75 4,58 4,58 4,58 4,53
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI PRODUCTION, SALES AND SELF CONSUMPTION
45
62,71 PLTG GTPP
PLTGU CPP
Realisasi | Realization 2014
PLTD DPP
PLTP GPP
Realisasi | Realization 2015
PLTA HPP
4,53
4,19
4,39
4,58
2,20 o
0,75
0,62
0,52
4,86
4,62
4,70 o
3,32
2,63
2,47
1,08
1,38
1,52
13,84 PLTU SPP
5,68
5,64
22
2015
Realisasi Pemakaian Sendiri Per Jenis Pembangkit Tahun 2014-2015 dan Rencana Tahun 2016 (%) Self Consumption Realization Per Power Plant Type in 2014-2015 and Plan of 2016 (%)
5,43
Grafik Graph
LAPORAN STATISTIK STATISTIC REPORT
PLTDG GTDPP
Rencana | Plan 2016
INDONESIA POWER
2015
46
TW I (%)
398,09 311,08 310,03 1,05 2,44 0,27 2,16 42,50 40,50 1,99 0,00 34,22 7,60 0,27 0,27 398,09
(GWh)
4,41 6,15 6,13 0,96 3,06 0,88 2,51 2,39 193,39 72,79 4,64 0,59 9,69 9,69 4,41
TW III (%)
435,39 343,88 342,77 1,11 2,55 0,28 2,27 46,02 45,49 0,53 0,00 32,81 6,59 3,56 0,78 2,78 435,39
TW IV
(GWh)
4,38 5,76 5,74 1,37 0,90 1,46 2,51 2,48 22,21 4,60 0,65 1,54 1,33 1,61 4,38
(%)
436,26 340,07 338,78 1,29 2,20 0,28 1,92 52,93 52,32 0,61 34,71 2,98 3,39 0,49 2,90 436,26
(GWh)
4,54 5,44 5,42 3,60 0,55 16,75 2,65 2,63 9,83 54,83 4,57 0,69 2,96 8,29 2,67 4,54
(GWh)
(%)
1.718,37 1.327,27 1.322,37 4,90 9,38 1,05 8,32 217,63 213,78 3,85 0,01 133,68 21,21 9,28 2,86 6,42 1.718,37
4,39 5,64 5,62 1,52 0,61 1,88 2,63 2,59 12,84 62,71 4,62 0,62 2,20 2,38 2,12 4,39
(%)
448,63 332,24 330,79 1,44 2,19 0,23 1,97 76,18 75,47 0,71 31,93 4,04 2,07 1,33 0,74 448,63
4,26 5,31 5,29 1,93 0,27 6,38 2,77 2,77 3,49 66,27 4,68 0,61 2,77 2,50 3,43 4,26
PLTU SPP
TW I
PLTD DPP
TW II
PLTP GPP
TW III
PLTA HPP
TW IV
4,26
4,54
4,38
4,41
2,96
PLTDG GTDPP
2,77
1,54
0,69
0,61
0,65
0,59
4,68
4,57
4,64
4,60
9,69 PLTGU CPP
0
2,77
2,51
3,60
PLTG GTPP
1,93
1,37
0,96
5,31
5,44
5,76
54,83
66,27
72,79
Pemakaian Sendiri Per Jenis Pembangkit Tahun 2015 (%) Self Consumption Per Power Plant Type in 2015 (%)
6,15
23
TW II
(GWh)
A. JAWA BALI GRID & EMBEDDED PLTU | SPP PLTU (batu bara) | Coal-fired SPP PLTU (Gas) | Gas SPP PLTU (MFO) | MFO SPP PLTG | GTPP PLTG (Gas) | Gas GTPP PLTG (HSD) | HSD GTPP PLTGU | CPP PLTGU (Gas) | Gas CPP PLTGU (HSD) | HSD CPP PLTD | DPP PLTP | GPP PLTA | HPP PLTDG | GTDPP PLTDG (MFO) | MFO GTDPP PLTDG (HSD) | HSD GTDPP INDONESIA POWER
Grafik Graph
2015
Triwulan | Quarterly
Jenis Pembangkitan Generating Unit
2,65
23
Pemakaian Sendiri Per Jenis Pembangkit Tahun 2015 Self Consumption Per Power Plant Type in 2015
2,51
Tabel Table
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI PRODUCTION, SALES AND SELF CONSUMPTION
LAPORAN STATISTIK STATISTIC REPORT
INDONESIA POWER
PRODUKSI, PENJUALAN DAN PEMAKAIAN SENDIRI PRODUCTION, SALES AND SELF CONSUMPTION
LAPORAN STATISTIK STATISTIC REPORT
2015
47
Pemakaian Bahan Bakar Fuel Consumption
2015
48
PEMAKAIAN BAHAN BAKAR FUEL CONSUMPTION
LAPORAN STATISTIK STATISTIC REPORT
PEMAKAIAN BAHAN BAKAR FUEL CONSUMPTION
2011 Batu bara | Coal (ton) Pertumbuhan Pemakaian Batubara | Coal Consumption Growth HSD (kiloliter) MFO (kiloliter)
9,70
(4,82)
5,24
915.700,03
778.070,12
326.944,37
3,99
(54,05)
(11,88)
(15,03)
(57,98)
545.631,87
198.953,28
132.096,78
121.422,19
100.803,69
(14,58)
(63,54)
(33,60)
(8,08)
(16,98)
34.883.625,00
57.648.169,95
65.226.077,55
62.838.572,47
76.851.476,82
45,23
65,26
13,15
(3,66)
22,30
778.070,12
915.700,03
1.039.142,73
2.261.263,36
2013 HSD (kiloliter)
121.422,19
132.096,78
198.953,28
545.631,87
2012
12.168.481,74
(5,89)
Pemakaian Bahan Bakar HSD dan MFO Tahun 2011-2015 (kiloliter) HSD and MFO Fuel Consumption in 2011-2015 (kiloliter)
2011
11.562.703,83
1.039.142,73
Pertumbuhan Pemakaian Gas | Gas Consumption Growth (%)
24
2015
2014
12.147.717,11
(0,58)
Pertumbuhan Pemakaian MFO | MFO Consumption Growth (%) Gas (mmbtu)
2013
11.073.637,92
2.261.263,36
Pertumbuhan Pemakaian HSD | HSD Consumption Growth (%)
Grafik Graph
2012
11.766.489,00
2014 MFO (kiloliter)
326.944,37
24
Pemakaian Bahan Bakar Tahun 2011-2015 Fuel Consumption in 2011-2015
100.803,69
Tabel Table
2015
PEMAKAIAN BAHAN BAKAR FUEL CONSUMPTION
Grafik Graph
25
LAPORAN STATISTIK STATISTIC REPORT
2015
49
Pertumbuhan Pemakaian Bahan Bakar HSD dan MFO Tahun 2011-2015 (%) HSD and MFO Consumption Growth in 2011-2015 (%)
10 0
2011
2012
2013
2014
2015
-10 -20 -30 -40 -50 -60 -70 -80 Pertumbuhan Pemakaian HSD | HSD Consumption Growth (%)
Grafik Graph
Pemakaian Bahan Bakar Gas (mmbtu) dan Batubara (ton) Tahun 2011-2015 Gas (mmbtu) and Coal (ton) Consumption in 2011-2015
2012
2013 Gas (mmbtu)
Grafik Graph
27
2014
76.851.476,82
12.168.481,74
62.838.572,47
11.562.703,83
12.147.717,11
11.073.637,92
11.766.489
2011
65.226.077,55
34.883.625,00
57.648.169,95
26
Pertumbuhan Pemakaian MFO | MFO Consumption Growth (%)
2015
Batu bara | Coal (ton)
Pertumbuhan Pemakaian Bahan Bakar Gas dan Batubara Tahun 2011-2015 (%) Gas Consumption and Coal Consumption Growth in 2011-2015 (%)
80 70 60 50 40 30 20 10 0 -10
2011
2012
Pertumbuhan Pemakaian Gas | Gas Consumption Growth (%)
2013
2014
2015
Pertumbuhan Pemakaian Batubara | Coal Consumption Growth (%)
2015
50
PEMAKAIAN BAHAN BAKAR FUEL CONSUMPTION
LAPORAN STATISTIK STATISTIC REPORT
PEMAKAIAN BAHAN BAKAR PER UNIT FUEL CONSUMPTION PER UNIT Tabel Table
Realisasi Pemakaian Bahan Bakar Per Unit Tahun 2014-2015 dan Rencana Tahun 2016 Fuel Consumption Realization Per Unit in 2014-2015 and Plan of 2016
25
Unit
Realisasi Realization
Jenis Bahan Bakar Fuel Type
Rencana Plan
Realisasi Realization 2015
2014
Pencapaian Achievement (%)
Rencana Plan 2016
Pertumbuhan Growth (%) 2014 2015
A. JAWA BALI GRID & EMBEDDED Suralaya
Batubara | Coal (ton) HSD (kiloliter) HSD (kiloliter) Gas (mmbtu) HSD (kiloliter) MFO (kiloliter) Gas (mmbtu) HSD (kiloliter) MFO (kiloliter) Gas (mmbtu) HSD (kiloliter) MFO (kiloliter) Gas (mmbtu) Batubara | Coal (ton) HSD (kiloliter) MFO (kiloliter) Gas (mmbtu)
Priok Semarang
Perak Grati
Bali Total
11.562.703,83 6.288,40 44.768,69 31.763.849,44 32.498,54 2.097,51 2.946.034,78 3.485,96 28.128.688,25 327.295,37 11.562.703,83 414.336,96 2.097,51 62.838.572,47
12.184.200,00 172.904,03 32.040,000,00 110.893,98 84.344,38 24.591.416,67 24.632,70 33.061.806,73 136.497,99 213.446,45 12.184.200,00 430.296,00 322.423,53 89.693.223,39
12.168.481,74 6.856,20 7.245,11 29.333.742,50 656,36 23.690.310,75 2.423,46 23.827.423,57 242.109,79 25.817,20 12.168.481,74 259.290,91 25.817,20 76.851.476,82
99,87 4,19 91,55 0,59 96,34 72,07 177,37 12,10 99,87 60,26 8,01 85,68
11.726.437,54 8.145,00 30.260,000 7.200,00 51.027,000 36.276,400 19.927,81 11.209,728 11.726.437,54 45.272,81 128.773,128
4,42 (56,83) (86,93) 13,25 (49,22) (93,10) 662,29 (66,95) (100,00) (3,72) (19,17) 4,42 (50,47) (96,96) 9,00
5,24 9,03 (83,82) (7,65) (97,98) (100,00) 704,14 (30,48) (15,29) (26,03) 5,24 (37,42) 1.130,85 22,30
74,85 101.867,00 89,000,00 99,87 11.726.437,54 75,98 45.272,81 23,85 101.867,00 42,47 128.862.128,00
(8,22) 21,611,25 (52,48) 4,42 (25,12) (38,97) 9,00
62,84 25,24 5,24 (57,98) (16,98) 22,30
B. PEMBELIAN LISTRIK | PURCHASE OF ELECTRICITY Pesanggaran Pemaron Nusa Penida Karimunjawa INDONESIA POWER
Realisasi Pemakaian Bahan Bakar HSD dan MFO Per Unit Tahun 2014-2015 dan Rencana Tahun 2016 (kiloliter) HSD and MFO Consumption Realization Per Unit in 2014-2015 and Plan of 2016 (kiloliter)
326.944,37
778.070,12
45.272,81 101.867,00
Realisasi | Realization 2014
100.803,69
28
Gas (mmbtu) Batubara | Coal (ton) HSD (kiloliter) MFO (kiloliter) Gas (mmbtu)
119.324,68 100.179,00 74.986,49 268.071,86 67.653,46 95.661,30 - 91.250,000,00 11.562.703,83 12.184.200,00 12.168.481,74 778.070,12 430.296,00 326.944,37 121.422,19 422.602,53 100.803,69 62.838.572,47 180.943.223,39 76.851.476,82
121.422,19
Grafik Graph
MFO (kiloliter) HSD (kiloliter) HSD (kiloliter)
Realisasi | Realization 2015
Rencana | Plan 2016
HSD (kiloliter)
MFO (kiloliter)
PEMAKAIAN BAHAN BAKAR FUEL CONSUMPTION
128.862.128.00
Realisasi | Realization 2015
Realisasi | Realization 2014
Gas (mmbtu)
Tabel Table
26 Unit
51
11.726.437.54
11.562.703.83
12.168.481.74
62.838.572.47
29
2015
Realisasi Pemakaian Bahan Bakar Gas (mmbtu) dan Batubara (ton) 2014-2015 dan Rencana Tahun 2016 Gas (mmbtu) and Coal (ton) Consumption Realization in 2014-2015 and Plan of 2016
76.851.476.82
Grafik Graph
LAPORAN STATISTIK STATISTIC REPORT
Rencana | Plan 2016
Batu bara | Coal
Pemakaian Bahan Bakar Per Unit Tahun 2015 Fuel Consumption Per Unit in 2015 Jenis Bahan Bakar Fuel Type
TW I
A. JAWA BALI GRID & EMBEDDED Suralaya Batubara | Coal (ton) 2.650.916,97 HSD (kiloliter) 2.622,70 Priok HSD (kiloliter) 75.52 Gas (mmbtu) 7.474.458,76 Semarang HSD (kiloliter) 349,11 MFO (kiloliter) Gas (mmbtu) 2.930.673,89 Perak Grati HSD (kiloliter) 33,68 Gas (mmbtu) 4.762.157,47 Bali HSD (kiloliter) 95.461,05 MFO (kiloliter) Gas (mmbtu) Total Batubara | Coal (ton) 2.650.916,97 HSD (kiloliter) 98.542,06 MFO (kiloliter) Gas (mmbtu) 15.167.290,11 B. PEMBELIAN LISTRIK | PURCHASE OF ELECTRICITY Pesanggaran HSD (kiloliter) 40.542,72 MFO (kiloliter) 34.712,16 Nusa Penida INDONESIA POWER Batubara | Coal (ton) 2.650.916,97 HSD (kiloliter) 139.084,78 MFO (kiloliter) 34.712,16 Gas (mmbtu) 15.167.290,11
Triwulan | Quarterly TW II TW III
TW IV
2015
3.217.413,50 1.418,10 563,71 7.903.472,38 30,07 2.749.541,89 5.926.425,22 101.166,63 13.159,50 3.217.413,50 103.178,51 13.159,50 16.579.439,49
3.145.119,68 1.426,50 1.462,88 6.148.424,58 40,04 6.163.671,92 6.228.890,37 30.465,70 1.232,00 3.145.119,68 33.395,13 1.232,00 18.540.986.87
3.155.031,59 1.388,90 5.142,99 7.807.386,79 237,13 11.846.423,04 2.389,78 6.909.950,51 15.016,41 11.425,70 3.155.031,59 24.175,22 11.425,70 26.563.760,34
12.168.481,74 6.856,20 7.245,11 29.333.742,50 656,36 23.690.310,75 2.423,46 23.827.423,57 242.109,79 25.817,20 12.168.481,74 259.290,91 25.817,20 76.851.476,82
24.195,31 24.487,72 3.217.413,50 127.373,82 37.647,21 16.579.439,49
2.419,49 10.776,63 3.145.119,68 35.814,62 12.008,63 18.540.986,87
495,93 5.009,99 3.155.031,59 24.671,15 16.435,69 26.563.760,34
67.653,46 74.986,49 12.168.481,74 326.944,37 100.803,69 76.851.476,82
2015
Pemakaian Bahan Bakar HSD dan MFO Tahun 2015 (kiloliter) HSD and MFO Fuel Consumption in 2015 (kiloliter)
TW II HSD (kiloliter)
MFO (kiloliter)
26.563.760,34 18.540.986,87 3.145.119,68
3.155.031,59
16.579.439,49
TW I
3.217.413,50
15.167.290,11
31
TW IV
Pemakaian Bahan Bakar Gas (mmbtu) dan Batubara (ton) Tahun 2015 Gas (mmbtu) and Coal (ton) Consumption in 2015
2.650.916,97
Grafik Graph
TW III
16.435,69
34.712,16 TW I
24.671,15
127.373,82
139.084,78
30
PEMAKAIAN BAHAN BAKAR FUEL CONSUMPTION
35.814,62 12.008,63
Grafik Graph
LAPORAN STATISTIK STATISTIC REPORT
37.647,21
52
TW II
TW III
TW IV
Gas (mmbtu)
Batu bara | Coal (ton)
PEMAKAIAN BAHAN BAKAR FUEL CONSUMPTION
2015
LAPORAN STATISTIK STATISTIC REPORT
53
PEMAKAIAN BAHAN BAKAR PER JENIS PEMBANGKIT
FUEL CONSUMPTION PER POWER PLANT TYPE Tabel Table
27
Realisasi Pemakaian Bahan Bakar Per Jenis Pembangkit Tahun 2014-2015 dan Rencana Tahun 2016 Fuel Consumption Realization Per Power Plant Type in 2014-2015 and Plan of 2016
Jenis Pembangkitan Power Plant Type
Jenis Bahan Bakar Fuel Type
Realisasi Realization
Rencana Plan
Pencapaian Achievement (%)
Realisasi Realization 2015
2014
Pertumbuhan Growth (%)
Rencana Plan 2016
2014
2015
A. JAWA BALI GRID & EMBEDDED PLTU | SPP
Batubara Coal (ton) HSD (kiloliter)
PLTG | GTPP
12.184.200,00
12.168.481,74
99,87
11.726.437,54
4,42
5,24
6.289,24
-
6.856.20
-
-
(57,85)
9,01
MFO (kiloliter)
-
108.977,08
-
-
-
(100,00)
-
Gas (mmbtu)
-
2.355.139,33
-
-
6.739.406,90
-
-
HSD (kiloliter)
328.299,02
142.483,50
171.748,49
120,54
8.160,14
(13,46)
(47,69)
3.753.427,20
6.052.000,00
2.655.552,66
43,88
6.052.000,00
98,37
(29,25)
HSD (kiloliter)
77.383,08
277.812,50
7.740,60
2,79
14.345,00
(81,09)
(90,00)
MFO (kiloliter)
2.097,51
-
-
-
-
358,09
(100,00)
Gas (mmbtu) PLTGU | CPP
11.562.703,83
59.085.145,27
81.286.084,06
74.195.924,16
91,28
104.771.993,10
5,97
25,57
PLTD | DPP
HSD (kiloliter)
Gas (mmbtu)
2.365,63
-
-
-
-
(92,85)
(100,00)
PLTDG | GTDPP
HSD (kiloliter)
-
-
72.945,63
12.767,68
-
-
MFO (kiloliter)
-
213.446,45
25.817,20
12,10
-
-
-
Gas (mmbtu)
-
-
-
-
11.209.728,00
11.562.703,83
12.184.200,00
12.168.481,74
99,87
11.726.437,54
4,42
5,24
Total
Batubara Coal (ton) HSD (kiloliter)
414.336,96
430.296,00
259.290,91
60,26
45.272,81
(51,06)
(37,42)
MFO (kiloliter)
2.097,51
322.423,53
25.817,20
8,01
-
(96,96)
1,130,85
62.838.572,47
89.693.223,39
76.851.476,82
85,68
128.773.128,00
9,00
22,30
-
67.653,46
-
-
79,57
(81,40)
Gas (mmbtu)
B. PEMBELIAN LISTRIK | PURCHASE OF ELECTRICITY PLTD | DPP
HSD (kiloliter)
363.733,16
MFO (kiloliter)
119.324,68
100.179,00
74.986,49
74,85
101.867,00
(8,22)
(37,16)
PLTMG | GTMPP
Gas (mmbtu)
-
91.250.000,00
-
-
89.000,00
-
-
11.562.703,83
12.184.200,00
12.168.481,74
99,87
11.726.437,54
4,42
5,24
INDONESIA POWER
Batubara Coal (ton) HSD (kiloliter)
778.070,12
430.296,00
326.944,37
75,98
45.272,81
(25,84)
(57,98)
MFO (kiloliter)
121.422,19
422.602,53
100.803,69
23,85
101.867,00
(38,97)
(16,98)
62.838.572,47
180.943.223,39
76.851.476,82
42,47
128.862.128,00
9,00
22,30
Gas (mmbtu)
2015
54
Tabel Table
28
LAPORAN STATISTIK STATISTIC REPORT
PEMAKAIAN BAHAN BAKAR FUEL CONSUMPTION
Pemakaian Bahan Bakar Per Jenis Pembangkit Tahun 2015 Fuel Consumption Per Power Plant Type in 2015
Jenis Pembangkitan Power Plant Type
Jenis Bahan Bakar Fuel Type
Triwulan | Quarterly TW I
2015
TW II
TW III
TW IV
2.650.916,97
3.217.413,50
3.145.119,68
3.155.031,59
12.168.481,74
2.622,70
1.418,10
1.426,50
1.388,90
6.856,20
A. JAWA BALI GRID & EMBEDDED PLTU | SPP
Batubara | Coal (ton) HSD (kiloliter)
-
-
-
-
-
PLTG | GTPP
HSD (kiloliter)
MFO (kiloliter)
95.477,95
60.029,09
4.578,71
11.662,74
171.748,49
Gas (mmbtu)
159.770,37
489.250,46
771.098,76
1.235.433,07
2.655.552,66
PLTGU | CPP
HSD (kiloliter)
439,96
592,16
1.501,09
5.207,39
7.740,60
MFO (kiloliter) Gas (mmbtu) PLTDG | GTDPP
HSD (kiloliter)
Total
Batubara | Coal (ton)
MFO (kiloliter)
-
-
-
-
-
15.007.519,74
16.090.189,04
17.769.888,11
25.328.327,27
74.195.924,16
1,46
41.139,15
25.888,83
5.916,18
72.945,63
-
13.159,50
1.232,00
11.425,70
25.817,20
2.650.916,97
3.217.413,50
3.145.119,68
3.155.031,59
12.168.481,74
HSD (kiloliter)
98.542,06
103.178,51
33.395,13
24.175,22
259.290,91
MFO (kiloliter)
-
13.159,50
1.232,00
11.425,70
25.817,20
15.167.290,11
16.579.439,49
18.540.986,87
26.563.760.34
76.851.476,82
Gas (mmbtu) B. PEMBELIAN LISTRIK | PURCHASE OF ELECTRICITY PLTD | DPP INDONESIA POWER
HSD (kiloliter)
40.542,72
24.195,31
2.419,49
495,93
67.653,46
MFO (kiloliter)
34.712,16
24.487,72
10.776,63
5.009,99
74.986,49 12.168.481,74
2.650.916,97
3.217.413,50
3.145.119,68
3.155.031,59
HSD (kiloliter)
Batubara | Coal (ton)
139.084,78
127.373,82
35.814,62
24.671,15
326.944,37
MFO (kiloliter)
34.712,16
37.647,21
12.008,63
16.435,69
100.803,69
15.167.290,11
16.579.439,49
18.540.986,87
26.563.760,34
76.851.476,82
Gas (mmbtu)
Kinerja Operasional Operational Performance
2015
56
KINERJA OPERASIONAL OPERATIONAL PERFORMANCE
LAPORAN STATISTIK STATISTIC REPORT
KINERJA
PERFORMANCE Tabel Table
29
Kinerja Unit Indonesia Power Tahun 2011-2015 Indonesia Power Unit Performance in 2011-2015 Unsur Kinerja Performance Factor
Tahun | Year 2011
2012
2013
2014
2015
60,39
51,88
55,30
50,17
51,89
91,09
92,33
93,04
89,88
90,85
Faktor Efisiensi | Efficiency Factor CF (%) Faktor Keandalan | Reliability Factor EAF (%)
Grafik Graph
32
Kinerja Unit Indonesia Power Tahun 2011-2015 (%) Indonesia Power Unit Performance in 2011-2015 (%)
100
80
60
40
2011
2012
2013 CF (%)
2014 EAF (%)
2015
KINERJA OPERASIONAL OPERATIONAL PERFORMANCE
Tabel Table
30
LAPORAN STATISTIK STATISTIC REPORT
2015
57
Realisasi EAF Tahun 2014-2015 dan Rencana Tahun 2016 EAF Realization in 2014-2015 and Plan of 2016
Unit
Realisasi Realization
Rencana Plan
Realisasi Realization
Pencapaian Achievement (%)
2015
2014
Rencana Plan 2016
Suralaya
84,05
90,44
91,41
101,07
90,00
Priok
87,48
92,27
90,81
98,42
89,40
Saguling
97,30
93,30
92,26
98,89
91,21
Kamojang
91,97
96,33
96,61
100,29
92,91
Semarang
96,77
90,59
84,09
92,83
88,48
Mrica
97,90
97,39
98,09
100,71
96,55
Perak Grati
95,78
93,01
93,44
100,47
92,51
Bali
91,78
91,06
87,19
95,75
88,10
INDONESIA POWER
89,88
91,70
90,85
99,07
90,32
Pencapaian Achievement (%)
Rencana Plan
Tabel Table
31
Realisasi CF Tahun 2014-2015 dan Rencana Tahun 2016 CF Realization in 2014-2015 and Plan of 2016
Unit
Realisasi Realization
Rencana Plan
Realisasi Realization 2015
2014 Suralaya Priok Saguling Kamojang Semarang Mrica Perak Grati Bali INDONESIA POWER
75,98 35,66 45,31 87,36 3,25 32,24 39,59 28,75 50,17
77,90 43,84 46,97 85,69 32,04 39,06 47,73 23,83 56,41
2016 78,93 34,79 35,82 96,44 24,89 32,77 32,83 18,47 51,89
101,32 79,35 76,27 112,55 77,71 83,90 68,79 77,50 91,98
74,91 35,66 37,93 89,35 53,29 36,88 50,55 27,57 56,79
2015
58
LAPORAN STATISTIK STATISTIC REPORT
KINERJA OPERASIONAL OPERATIONAL PERFORMANCE
KINERJA PER UNIT PERFORMANCE PER UNIT Tabel Table
32
Kinerja Unit Pembangkitan Suralaya Tahun 2015 Suralaya Generating Unit Performance in 2015
Unsur Kinerja Performance Factor Faktor Efisiensi | Efficiency Factor CF (%) Faktor Keandalan | Reliability Factor EAF (%)
Grafik Graph
33
Triwulan I Quarter s/d September Until September
s/d Maret Until March
s/d Juni Until June
s/d Desember Until December
68,43
74,34
77,37
78,93
87,72
89,54
91,33
91,41
Kinerja Unit Pembangkitan Suralaya Tahun 2015 (%) Suralaya Generating Unit Performance in 2015 (%)
100
80
60
s/d Maret/Until March
s/d Juni/Until June
s/d September/Until September
CF (%)
Tabel Table
33
s/d Desember/Until December
EAF (%)
Kinerja Unit Pembangkitan dan Jasa Pembangkitan Priok Tahun 2015 Priok Generating and Generating Services Unit Performance in 2015
Unsur Kinerja Performance Factor
Triwulan I Quarter s/d Maret Until March
s/d Juni Until June
s/d September Until September
s/d Desember Until December
36,29
37,17
34,16
34,79
94,41
91,77
92,30
90,81
Faktor Efisiensi | Efficiency Factor CF (%) Faktor Keandalan | Reliability Factor EAF (%)
KINERJA OPERASIONAL OPERATIONAL PERFORMANCE
Grafik Graph
34
LAPORAN STATISTIK STATISTIC REPORT
2015
59
Kinerja Unit Pembangkitan dan Jasa Pembangkitan Priok Tahun 2015 (%) Priok Generating and Generating Services Unit Performance in 2015 (%)
100
80
60
40
20
s/d Maret/Until March
s/d Juni/Until June
s/d September/Until September
CF (%) Tabel Table
34
s/d Desember/Until December
EAF (%)
Kinerja Unit Pembangkitan Saguling Tahun 2015 Saguling Generating Unit Performance in 2015
Unsur Kinerja Performance Factor
Triwulan I Quarter s/d Maret Until March
s/d Juni Until June
s/d September Until September
s/d Desember Until December
54,52
47,47
38,12
35,82
99,29
98,61
93,71
92,26
Faktor Efisiensi | Efficiency Factor CF (%) Faktor Keandalan | Reliability Factor EAF (%) Grafik Graph
35
Kinerja Unit Pembangkitan Saguling Tahun 2015 (%) Saguling Generating Unit Performance in 2015 (%)
100
80
60
40
20
s/d Maret/Until March
s/d Juni/Until June CF (%)
s/d September/Until September EAF (%)
s/d Desember/Until December
2015
60
Tabel Table
35
LAPORAN STATISTIK STATISTIC REPORT
KINERJA OPERASIONAL OPERATIONAL PERFORMANCE
Kinerja Unit Pembangkitan dan Jasa Pembangkitan Kamojang Tahun 2015 Kamojang Generating and Generating Services Unit Performance in 2015
Unsur Kinerja Performance Factor
Triwulan I Quarter s/d Maret Until March
s/d Juni Until June
s/d September Until September
s/d Desember Until December
99,64
97,55
98,55
96,44
99,12
96,88
97,71
96,61
Faktor Efisiensi | Efficiency Factor CF (%) Faktor Keandalan | Reliability Factor EAF (%)
Grafik Graph
36
Kinerja Unit Pembangkitan dan Jasa Pembangkitan Kamojang Tahun 2015 (%) Kamojang Generating and Generating Services Unit Performance in 2015 (%)
100
80
60
40
20
s/d Maret/Until March
s/d Juni/Until June CF (%)
s/d September/Until September EAF (%)
s/d Desember/Until December
KINERJA OPERASIONAL OPERATIONAL PERFORMANCE
Tabel Table
36
LAPORAN STATISTIK STATISTIC REPORT
2015
61
Kinerja Unit Pembangkitan Mrica Tahun 2015 Mrica Generating Unit Performance in 2015
Unsur Kinerja Performance Factor
Tahun | Year s/d Maret Until March
s/d Juni Until June
s/d September Until September
s/d Desember Until December
52,09
48,51
36,23
32,77
99,68
99,67
97,68
98,09
Faktor Efisiensi | Efficiency Factor CF (%) Faktor Keandalan | Reliability Factor EAF (%)
Grafik Graph
37
Kinerja Unit Pembangkitan Mrica Tahun 2015 (%) Mrica Generating Unit Performance in 2015 (%)
100
80
60
40
20
s/d Maret/Until March
s/d Juni/Until June CF (%)
s/d September/Until September EAF (%)
s/d Desember/Until December
2015
62
Tabel Table
37
LAPORAN STATISTIK STATISTIC REPORT
KINERJA OPERASIONAL OPERATIONAL PERFORMANCE
Kinerja Unit Pembangkitan Semarang Tahun 2015 Semarang Generating Unit Performance in 2015
Unsur Kinerja Performance Factor
Triwulan I Quarter s/d Maret Until March
s/d Juni Until June
s/d September Until September
s/d Desember Until December
11,89
11,41
16,41
24,89
95,90
88,68
85,70
84,09
Faktor Efisiensi | Efficiency Factor CF (%) Faktor Keandalan | Reliability Factor EAF (%)
Grafik Graph
38
Kinerja Unit Pembangkitan Semarang Tahun 2015 (%) Semarang Generating Unit Performance in 2015 (%)
100
80
60
40
20
0
s/d Maret/Until March
s/d Juni/Until June CF (%)
s/d September/Until September EAF (%)
s/d Desember/Until December
KINERJA OPERASIONAL OPERATIONAL PERFORMANCE
Tabel Table
38
LAPORAN STATISTIK STATISTIC REPORT
2015
63
Kinerja Unit Pembangkitan Perak Grati Tahun 2015 Perak Grati Generating Unit Performance in 2015
Unsur Kinerja Performance Factor
Triwulan I Quarter s/d Maret Until March
s/d Juni Until June
s/d September Until September
s/d Desember Until December
28,11
31,44
32,71
32,83
99,58
97,49
97,96
93,44
Faktor Efisiensi | Efficiency Factor CF (%) Faktor Keandalan | Reliability Factor EAF (%)
Grafik Graph
39
Kinerja Unit Pembangkitan Perak Grati Tahun 2015 (%) Perak Grati Generating Unit Performance in 2015 (%)
100
80
60
40
20
s/d Mar | Until Mar
s/d Jun | Until June CF (%)
s/d Sept | Until Sept EAF (%)
s/d Des | Until Dec
2015
64
Tabel Table
39
LAPORAN STATISTIK STATISTIC REPORT
KINERJA OPERASIONAL OPERATIONAL PERFORMANCE
Kinerja Unit Pembangkitan dan Jasa Pembangkitan Bali Tahun 2015 Bali Generating and Generating Services Unit Performance in 2015
Unsur Kinerja Performance Factor
Triwulan I Quarter s/d Maret Until March
s/d Juni Until June
s/d September Until September
s/d Desember Until December
21,85
27,67
21,88
18,47
96,91
84,74
88,59
87,19
Faktor Efisiensi | Efficiency Factor CF (%) Faktor Keandalan | Reliability Factor EAF (%)
Grafik Graph
40
Kinerja Unit Pembangkitan dan Jasa Pembangkitan Bali Tahun 2015 (%) Bali Generating and Generating Services Unit Performance in 2015 (%)
100
80
60
40
100
20 0
s/d Maret/Until March
s/d Juni/Until June CF (%)
s/d September/Until September EAF (%)
s/d Desember/Until December
KINERJA OPERASIONAL OPERATIONAL PERFORMANCE
LAPORAN STATISTIK STATISTIC REPORT
2015
65
Keuangan Financial
2015
66
KEUANGAN FINANCIAL
LAPORAN STATISTIK STATISTIC REPORT
KEUANGAN FINANCIAL
Tahun | Year
Uraian Description
2011
2012
53.485,11
Jumlah Aktiva (dalam Rp miliar) Total Asset (in billion Rp) Pertumbuhan | Growth (%) Jumlah Laba Tahun Berjalan (dalam Rp miliar) Total Income for The Year (in billion Rp) Pertumbuhan | Growth (%) Pendapatan Usaha (dalam Rp miliar) Electricity Sales Revenue (in billion Rp) Pertumbuhan | Growth (%) Pendapatan Penjualan Energi Listrik (dalam Rp miliar) Electricity Sales Revenue (in billion Rp) Pertumbuhan | Growth (%)
2015*)
53.248,06
226.486,56
2,19
0,14
(0,14)
(0,43)
325,34
1.266,74
1.242,47
1.647,23
4.679,53
10,10
9,43
(1,92)
32,58
184,08
43.416,12
32.472,48
33.531,49
35.723,62
32.020,19
25,80
(25,21)
3,26
6,54
(10,37)
42.917,04
31.852,55
32.933,05
34.828,75
30.680,91
(25,78)
3,39
5,76
(11,91)
25,70
*) Data after asset revaluation **) 2014 Financial data - restated
2011
2012
Jumlah Aktiva (dalam Rp miliar) Total Assets (in billion Rp)
2013 Jumlah Laba Tahun Berjalan (dalam Rp miliar) Total Income for the Year (in billion Rp)
2014
32.020,19
4.679,53
35.723,62
53.248,06
53.480,49 1.242,47
32.472,48
53.557,38 1.266,74
43.416,12
53.485,11
226.486,56
Jumlah Aktiva, Laba Tahun Berjalan dan Pendapatan Usaha Tahun 2011-2015 (dalam Rp miliar) Total Asset, Income for the Year and Revenue in 2011-2015 (in billion Rp)
1.157,63
41
2014**)
53.480,49
1.157,63
*) Data setelah revaluasi aset **) Data keuangan tahun 2014 restated
Grafik Graph
2013
53,557,38
1.647,23
40
Pertumbuhan Jumlah Aktiva, Laba Tahun Berjalan, Pendapatan Usaha dan Pendapatan Penjualan Energi Listrik Tahun 2011-2015 Growth of Total Asset, Income of the Year, Revenue and Electricity Sales Revenue in 2011-2015
33.531,49
Tabel Table
2015 Pendapatan Usaha (dalam Rp miliar) Electricity Sales Revenue (in billion Rp)
KEUANGAN FINANCIAL
Grafik Graph
42
LAPORAN STATISTIK STATISTIC REPORT
2015
67
Pertumbuhan Jumlah Aktiva, Laba Tahun Berjalan dan Pendapatan Usaha Tahun 2011-2015 (%) Total Asset, Income for the Year and Revenue Growth in 2011-2015 (%)
350 300 250 200 150 100 50 0 -50 2011
2012 Pertumbuhan Aktiva Growth of Assets (%)
Tabel Table
41
2013
2014
Pertumbuhan Laba Tahun Berjalan Growth of Income for The Year (%)
2015 Pertumbuhan Pendapatan Usaha Growth of Revenue (%)
Pendapatan Penjualan Energi Listrik Per Unit Tahun 2015 (dalam juta) Electricity Sales Revenue Per Unit in 2015 (in million)
Unit
Triwulan | Quarter TW I
TW II
TW III
TW IV
Jumlah | Total
Suralaya
2.955.624,93
3.366.080,57
3.514.798,56
3.478.951,31
13.315.455,38
Priok
1.277.939,21
1.331.925,30
1.204.289,50
1.261.173,83
5.075.327,85
Saguling
194.367,63
187.634,99
153.989,94
167.420,19
703.412,75
Kamojang
631.154,40
608.429,54
691.509,85
656.571,06
2.587.664,85
Semarang
507.968,59
470.192,99
833.074,43
1.343.838,43
3.155.074,45
74.823,78
72.858,75
56.338,94
57.184,78
261.206,26
526.736,03
546.449,57
711.051,24
769.848,49
2.554.085,33
Mrica Perak Grati Bali
1.194.158,71
1.183.856,38
401.901,01
248.766,09
3.028.682,18
INDONESIA POWER
7.362.773,29
7.767.428,10
7.566.953,48
7.983.754,19
30.680.909,05
2015
68
Tabel Table
42
LAPORAN STATISTIK STATISTIC REPORT
KEUANGAN FINANCIAL
Pendapatan Penjualan Energi Listrik Per Jenis Pembangkit Tahun 2015 (dalam juta) Electricity Sales Revenue Per Power Plant Type in 2015 (in million)
Jenis Pembangkit Power Plant Type
Triwulan | Quarter TW I
PLTG | GTPP PLTU | SPP PLTU-B | SPP-C
TW III
TW IV
Jumlah | Total
741.950,43
532.992,06
201.940,70
303.519,41
1.780.402,59
2.991.522,88
3.402.574,24
3.547.939,90
3.515.811,15
13.457.848,18
2.955.624,93
3.366.080,57
3.514.798,56
3.478.951,31
13.315.455,38
PLTU-M | SPP-F PLTGU | CPP
TW II
35.897,95
36.493,67
33.141,34
36.859,85
142.392,80
2.210.488,47
2.227.554,51
2.580.612,14
3.135.117,87
10.153.773,00
PLTA | HPP
269.191,41
260.493,74
210.328,88
224.604,98
964.619,01
PLTP | GPP
631.154,40
608.429,54
691.509,85
656.571,06
2.587.664,85
PLTD | DPP
518.465,70
353.574,45
86.807,99
16.295,93
975.144,07
-
381.809,55
247.814,01
131.833,79
761.457,36
7.362.773,29
7.767.428,10
7.566.953,48
7.983.754,19
30.680.909,05
PLTDG | GTDPP INDONESIA POWER Tabel Table
43
Laba Rugi Tahun 2014-2015 (dalam juta) Profit/Loss Statement in 2014-2015 (in million) Uraian | Description
2015
2014
Pendapatan Usaha | Revenue
32.020.186
35.723.617
Penjualan Tenaga Listrik | Electricity Sales
30.680.909
34.828.754
1.339.277
894.863
Beban Usaha | Operational Cost
29.929.498
33.527.047
Bahan Bakar dan Minyak Pelumas | Fuel and Lubricant
Pendapatan Jasa | Service Revenue
22.431.963
26.543.914
Pemeliharaan | Maintenance
2.405.605
2.080.842
Kepegawaian | Human Resource
1.760.602
1.337.719
Penyusutan aset tetap | Depreciation of Fixed Asset
2.728.472
2.674.160
Pembelian Tenaga Listrik dan Sewa | Electricity Purchase and Lease
244.555
612.366
Lain-lain | Others
358.301
278.046
2.090.688
2.196.570
8.198
73.881
Laba Usaha | Operating Income Pendapatan (Beban) Lain-lain | Other Income (Cost) Penghasilan bunga | Interest Income
31.383
28.718
Kerugian kurs mata uang asing-bersih | Foreign Exchange Loss - nett
(5.358)
(35.077)
Beban bunga | Interest Expense
(238)
(342)
(17.589)
80.582
Laba Sebelum Pajak Penghasilan | Income before tax
2.098.886
2.270.451
Manfaat (Beban) Pajak | Tax Benefit (Expense)
2.580.643
(623.219)
Penghasilan lain-lain bersih | Other Income - nett
Pajak Kini | Current Tax
(689.947)
(687.753)
Manfaat Pajak Tangguhan | Deferred Tax Benefit
3.270.590
64.534
Laba tahun berjalan | Income of the Year
4.679.529
1.647.232
KEUANGAN FINANCIAL
LAPORAN STATISTIK STATISTIC REPORT
2015
69
Kepegawaian Human Resources
2015
70
LAPORAN STATISTIK STATISTIC REPORT
KEPEGAWAIAN HUMAN RESOURCES
KEPEGAWAIAN HUMAN RESOURCES Tabel Table
44
Jumlah Pegawai Aktif Tahun 2011-2015 Total of Active Employees in 2011-2015 Tahun | Year
Unit
2011
Kantor Pusat | Head Office UP Suralaya | Suralaya GU UPJP Priok | Priok GGSU UP Saguling | Saguling GU UPJP Kamojang | Kamojang GGSU UP Semarang | Semarang GU UP Mrica | Mrica GU UP Perak Grati | Perak Grati GU UPJP Bali | Bali GGSU UJH | MSU UJP Banten 1 Suralaya | Banten 1 Suralaya GSU UJP Banten 2 Labuan | Banten 2 Labuan GSU UJP Banten 3 Lontar | UJP Banten 3 Lontar GSU UJP Jabar 2 Pel. Ratu | Jabar 2 Pel. Ratu GSU UJP Jateng 2 Adipala | Jateng 2 Adipala GSU UJP Pangkalan Susu | Pangkalan Susu GSU Jumlah Pegawai Aktif | Total of Active Employees
Grafik Graph
43
2012 336 759 314 351 307 356 300 226 245 137 65 93 113 57 3.659
2013 346 723 301 302 289 335 274 231 238 129 66 88 114 62 3.498
374 703 315 232 254 298 196 203 292 207 71 75 119 97 46 71 3.553
Jumlah Pegawai Aktif Tahun 2011-2015 Total of Active Employees in 2011-2015
3.659
3.639 3.553 3.498
2011
2012
3.462
2013
2014
Jumlah Pegawai Aktif | Total of Active Employees
2015
2014 374 696 304 271 271 319 223 217 231 160 74 79 117 93 33 3.462
2015
356 722 308 209 247 298 180 210 351 210 77 69 124 115 81 82 3.639
KEPEGAWAIAN HUMAN RESOURCES
Tabel Table
45
2015
LAPORAN STATISTIK STATISTIC REPORT
71
Jumlah Pegawai Berdasarkan Usia Tahun 2015 Total Employees Based on Age in 2015 Umur (Tahun) | Age (Year) Unit
< 26
26 - 30
31 - 35
36 - 40
41 - 45
Jumlah Pegawai Total of Employees
51-55
46 - 50
51 - 54
≥ 55
Usia Rata-Rata Average Age
Kantor Pusat | Head Office
8
82
31
78
48
50
58
1
356
40
UP Suralaya | Suralaya GU
202
88
61
13
91
113
153
1
722
38
UPJP Priok | Priok GGSU
83
48
31
11
68
34
33
0
308
37
UP Saguling | Saguling GU
36
20
13
7
18
30
83
2
209
43
UPJP Kamojang | Kamojang GGSU
36
27
8
6
96
21
53
0
247
41
UP Semarang | Semarang GU
63
56
33
17
43
21
61
4
298
38
UP Mrica | Mrica GU
17
22
9
5
29
29
69
0
180
44
UP Perak Grati | Perak Grati GU
41
54
37
11
35
10
20
2
210
35
109
69
48
16
55
27
26
1
351
34
UJH | MSU
UPJP Bali | Bali GGSU
76
35
15
15
37
11
21
0
210
34
UJP Banten 1 Suralaya | Banten 1 Suralaya GSU
15
30
9
5
2
5
11
0
77
35
8
17
17
2
12
8
5
0
69
37
UJP Banten 2 Labuan | Banten 2 Labuan GSU UJP Banten 3 Lontar | UJP Banten 3 Lontar GSU
35
50
8
2
7
9
13
0
124
33
UJP Jabar 2 Pel. Ratu | Jabar 2 Pel. Ratu GSU
33
50
2
2
10
6
12
0
115
33
UJP Jateng 2 Adipala | Jateng 2 Adipala GSU
24
25
11
6
5
8
2
0
81
33
UJP Pangkalan Susu | Pangkalan Susu GSU
33
25
7
6
10
1
0
0
82
30 38
Jumlah Pegawai Aktif | Total of Active Employees Prosentase | Percentage (%)
Grafik Graph
44
819
698
340
202
566
383
620
11
3.639
22,51
19,18
9,34
5,55
15,55
10,52
17,04
0,30
100
Jumlah Pegawai Berdasarkan Usia Tahun 2015 Total Employees Based on Age in 2015
22,51%
19,18%
9,34%
5,55%
31 - 35 Tahun | Year
36 - 40 Tahun | Year
15,55%
10,52%
17,04%
0,30%
< 26 Tahun | Year
41 - 45 Tahun | Year
26 - 30 Tahun | Year
46 - 50 Tahun | Year
51- 55 Tahun | Year
≥ 55 Tahun | Year
2015
72
Tabel Table
46
LAPORAN STATISTIK STATISTIC REPORT
KEPEGAWAIAN HUMAN RESOURCES
Jumlah Pegawai Berdasarkan Jenjang Jabatan Tahun 2015 Total Employees Based on Position Level in 2015 Jenjang Jabatan | Position Level Penyelia Atas | Senior Supervisor
Eksekutif Senior | Senior Executive
Kantor Pusat | Head Office
4
53
121
68
98
12
356
UP Suralaya | Suralaya GU
1
3
16
86
179
437
722
Eksekutif Executive
Penyelia Dasar | Junior Supervisor
Jumlah Pegawai Total Employees
Eksekutif Utama First Executive
Unit
Pelaksana Officer
UPJP Priok | Priok GGSU
-
1
6
36
69
196
308
UP Saguling | Saguling GU
-
1
6
39
62
101
209
UPJP Kamojang | Kamojang GGSU
-
1
5
43
63
135
247
UP Semarang | Semarang GU
-
1
6
43
64
184
298
UP Mrica | Mrica GU
-
1
4
38
52
85
180
UP Perak Grati | Perak Grati GU
-
1
6
39
51
113
210
UPJP Bali | Bali GGSU
-
1
13
49
105
183
351
UJH | MSU
1
4
32
47
37
89
210
UJP Banten 1 Suralaya | Banten 1 Suralaya GSU
-
1
5
22
35
14
77
UJP Banten 2 Labuan | Banten 2 Labuan GSU
-
1
5
24
33
6
69
UJP Banten 3 Lontar | UJP Banten 3 Lontar GSU
-
1
5
33
49
36
124
UJP Jabar 2 Pel. Ratu | Jabar 2 Pel. Ratu GSU
-
1
5
23
32
54
115
UJP Jateng 2 Adipala | Jateng 2 Adipala GSU
-
1
5
22
27
26
81
UJP Pangkalan Susu | Pangkalan Susu GSU
-
1
5
17
30
29
82
Jumlah Pegawai Aktif | Total of Active Employees Prosentase | Percentage (%)
Grafik Graph
45
6
73
245
629
986
1700
3.639
0,16
2,01
6,73
17,28
27,10
46,72
100
Jumlah Pegawai Berdasarkan Jenjang Jabatan Tahun 2015 Total Employees Based on Position Level in 2015
0,16%
2,01%
Eksekutif Utama First Executive
Eksekutif Senior Senior Executive
17,28%
27,10%
Penyelia Atas Senior Supervisor
Penyelia Dasar Junior Supervisor
6,73% Eksekutif Executive
46,72% Pelaksana Officier
KEPEGAWAIAN HUMAN RESOURCES
Tabel Table
47
LAPORAN STATISTIK STATISTIC REPORT
2015
73
Jumlah Pegawai Berdasarkan Jenis Kelamin Tahun 2015 Total Employees Based on Gender in 2015 Desember | December 2015
Unit
Pria | Male
Wanita | Female
Jumlah | Total
Kantor Pusat | Head Office
244
112
356
UP Suralaya | Suralaya GU
678
44
722
UPJP Priok | Priok GGSU
279
29
308
UP Saguling | Saguling GU
191
18
209
UPJP Kamojang | Kamojang GGSU
229
18
247
UP Semarang | Semarang GU
268
30
298
UP Mrica | Mrica GU
160
20
180
UP Perak Grati | Perak Grati GU
187
23
210
UPJP Bali | Bali GGSU
325
26
351
UJH | MSU
185
25
210
69
8
77
UJP Banten 1 Suralaya | Banten 1 Suralaya GSU
66
3
69
UJP Banten 3 Lontar | UJP Banten 3 Lontar GSU
118
6
124
UJP Jabar 2 Pel. Ratu | Jabar 2 Pel. Ratu GSU
114
1
115
UJP Jateng 2 Adipala | Jateng 2 Adipala GSU
78
3
81
UJP Banten 2 Labuan | Banten 2 Labuan GSU
UJP Pangkalan Susu | Pangkalan Susu GSU Jumlah Pegawai Aktif | Total of Active Employees
Grafik Graph
46
78
4
82
3.269
370
3.639
Jumlah Pegawai Berdasarkan Jenis Kelamin Tahun 2015 Total Employees Based on Gender in 2015
10,17% Wanita Female
89,83% Pria Male
2015
74
Tabel Table
LAPORAN STATISTIK STATISTIC REPORT
Jumlah Pegawai Berdasarkan Pendidikan Tahun 2015 Total Employees Based on Education in 2015
48
Unit
SD Primary School
Kantor Pusat | Head Office UP Suralaya | Suralaya GU UPJP Priok | Priok GGSU UP Saguling | Saguling GU UPJP Kamojang | Kamojang GGSU UP Semarang | Semarang GU UP Mrica | Mrica GU UP Perak Grati | Perak Grati GU UPJP Bali | Bali GGSU UJH | MSU UJP Banten 1 Suralaya | Banten 1 Suralaya GSU UJP Banten 2 Labuan | Banten 2 Labuan GSU UJP Banten 3 Lontar | UJP Banten 3 Lontar GSU UJP Jabar 2 Pel. Ratu | Jabar 2 Pel. Ratu GSU UJP Jateng 2 Adipala | Jateng 2 Adipala GSU UJP Pangkalan Susu | Pangkalan Susu GSU Jumlah Pegawai Aktif | Total of Active Employees Grafik Graph
47
KEPEGAWAIAN HUMAN RESOURCES
1 1 3 4 9
Pendidikan | Education SMP SMU SMK D3 Junior High Senior High Vocational Diploma School School High School Degree 2 20 25 42 10 45 418 134 5 12 169 69 15 27 118 23 5 22 147 44 6 18 147 58 9 17 85 30 9 96 39 1 8 156 93 1 11 82 43 1 14 9 2 19 17 2 41 33 2 25 25 19 32 1 20 29 54 197 1.581 720
S1 Bachelor Degree 213 110 48 24 28 62 33 65 91 67 52 29 47 62 28 31 990
Jumlah Pegawai S2 Total Master Employees Degree 54 356 5 722 5 308 1 209 247 4 298 2 180 1 210 2 351 6 210 1 77 2 69 1 124 1 115 2 81 1 82 88 3.639
Jumlah Pegawai Berdasarkan Pendidikan Tahun 2015 Total Employees Based on Education in 2015
0,25%
1,48%
SD Primary School
SMP Junior High School
5,41%
19,79%
27,21%
2,42%
D3 Diploma Degree
S1 Bachelor Degree
SMU Senior High School
S2 Master Degree
43,45% SMK Vocational High School
LAPORAN STATISTIK STATISTIC REPORT
2015
75
PENJELASAN
GLOSSARY OF TERMS
Istilah, definisi dan rumus-rumus yang digunakan adalah sebagai berikut:
Term, definitions and formulas used in this report as follow:
1. FAKTOR KAPASITAS yaitu kWh produksi bruto, adalah energi yang dibangkitkan oleh generator sebelum dikurangi energi pemakaian sendiri (untuk peralatan bantu, penerangan sentral, dan lain-lain), atau produksi energi listrik yang diukur pada terminal generator.
1. CAPACITY FACTOR kWh gross production is the amount of power generated before being subtracted by self consumption energy (for assisting machinery, central lighting,etc.), or production of energy as measured by terminal generator.
2. KAPASITAS TERPASANG adalah kapasitas suatu unit pembangkit sebagaimana tertera pada papan nama (name plate) dari generator atau mesin penggerak utama, dipilih mana yang lebih kecil. Khusus untuk PLTG, kapasitas terpasangnya adalah sebagaimana tertera pada papan nama berdasarkan base-load, bukan berdasarkan peak load.
2. INSTALLED CAPACITY is the capacity of a generating unit, as it shown on generator’s name plate of prime mover, whichever is smaller. Especially GTPP, the installed capacity is whatever shown on the name plate based on base load, not based on peak load.
3. EQUIVALENT AVAILABILITY FACTOR (EAF) Equivalent Availability Factor (EAF) yaitu faktor ketersediaan mesin pembangkit untuk beroperasi pada Daya Mampu Nettonya; dengan perhitungan = (jumlah jam unit pembangkit siap dioperasikan - (derating permanen + derating tidak permanen)) dibagi dengan jumlah jam dalam periode tertentu. Untuk PLTA yang dihitungkan adalah unit mesinnya, bukan ketersediaan debit air. Jam tersedia: jumlah jam dimana unit dalam keadaan operasi dan atau siap operasi.
3. EQUIVALENT AVAILABILITY FACTOR (EAF) Equivalent Availability Factor (EAF) is the availability factor of power plant engine to operate the Net Maximum Capacity the calculation is (number of hours the generating unit is ready to operate - (permanent derating + non-permanent derating)) divided by the number of hours in a given period. For HPP the derivative is the number of machine (unit), not the water volume. Availability hours: total hours of operation and/ or running hours.
4. PEMAKAIAN SENDIRI (PS) Perhitungan pemakaian sendiri (PS), merupakan selisih antara produksi bruto dengan penjualan (MWh) yang disalurkan ke sistem transmisi.
4. SELF CONSUMPTION Measurement for self consumption is the difference between gross production value and sales (MWh) delivered to the transmission system.
76
2015
LAPORAN STATISTIK STATISTIC REPORT
DAFTAR SINGKATAN LIST OF ABBREVIATION
CF : Capacity Factor EAF : Equivalent Available Factor GWh : Giga Watt-hour HSD : High Speed Diesel IPP : Independent Power Producer KW : Kilo Watt KWh : Kilo Watt-hour MFO : Marine Fuel Oil MW : Mega Watt MWh : Mega Watt-hour PJB : Pembangkitan Jawa-Bali PLTA : Pusat Listrik Tenaga Air PLTD : Pusat Listrik Tenaga Diesel PLTDG : Pusat Listrik Tenaga Diesel Gas PLTG : Pusat Listrik Tenaga Gas PLTGU : Pusat Listrik Tenaga Gas dan Uap PLTMG : Pusat Listrik Tenaga Mesin Gas PLTP : Pusat Listrik Tenaga Panas Bumi PLTU : Pusat Listrik Tenaga Uap P3B : Penyaluran dan Pusat Pengatur Beban Jawa-Bali UP : Unit Pembangkitan UJH : Unit Jasa Pemeliharaan UJP : Unit Jasa Pembangkitan UPJP : Unit Pembangkitan dan Jasa Pembangkitan MMBTU : 106 British Thermal Unit (MM=106) British Thermal Unit (BTU) adalah jumlah kalori yang diperlukan untuk menaikan 1 pound air 1 derajat Fahrenheit pada temperatur 60 derajat Fahrenheit, pada tekanan absolute 14,7 pound per square inch.
British Thermal Unit (BTU) is the total calories needed to raise 1 pound of water 1 Fahrenheit degree from temperature 60 Fahrenheit degrees with pressure 14.7 pound per square inc absolute.
Standard Cubic Foot (SCF) adalah sejumlah gas yang diperlukan untuk mengisi ruangan 1 Cubic Foot, dengan tekanan sebesar 14,7 pounds per square inch absolute dan pada temperatur 60 derajat Fahrenheit, dalam kondisi kering.
Standard Cubic Foot (SCF) is the total gas which needed to fit 1 Cubic Foot room, with pressure 14.7 pounds per square inch absolute and in temperature of 60 Fahrenheit degrees in dry condition.
1.000 BTU Gas adalah gas yang mempunyai Gross Heating Value sebesar 1.000 BTU tiap SCF.
1,000 BTU Gas is gas which has Gross Heating Value 1,000 BTU per SCF.
2015
LAPORAN STATISTIK STATISTIC REPORT PT INDONESIA POWER Jl. Jend Gatot Subroto Kav. 18 Jakarta 12950 Tel. (62-21) 526 7666 (hunting) Fax. (62-21) 525 1923, 525 2623 www.indonesiapower.co.id