Badan Rehabilitasi dan Rekonstruksi (BRR) NAD-Nias Perwakilan Nias
Jl. Diponegoro No. 439 Desa Sifalaete Tab. Kec. Gunungsitoli Kab. Nias Sumatera Utara Fax/Telp. 0639-22174
Temporary Shelter Bawolato
public hydrant in zto housing in tetesua sirombu CWS housing in Fadoro Sirombu 2
Acted housing in Muzoi Lahewa 1
Idano Gawo Bridge construction ZTOF housing in Tetesua Sirombu
Jln Sirao Gunung Sitoli after the construction
Perumahan Pengungsi Dahana
REPORT ON BUDGET & OFF BUDGET OF REHABILITATION & RECONSTRUCTION PROJECTS IN NIAS ISLAND As of December 01, 2006
CONTENT
1.
On Budget Report
2.
Off Budget Summary
3.
Top 10 of NGO Commitment
4.
Top 10 of NGO Disbursed
5.
Progress Summary of NGO Projects
6.
List of Implementer Partner in Nias Island
7.
Off Budget Report ( Detail )
8.
Progress Report of NGO in Nias Island ( Detail)
----------------------------------------
REKAPITULASI LAPORAN STATUS AKHIR PELAKSANAAN KEGIATAN SATKER ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN-P 2006 Status Bulan : 1 Desember 2006 REALISASI KEUANGAN NO
SATKER
1
2 I II
Bidang Perencanaan dan Pemprograman
PAGU DIPA
NILAI KONTRAK
3
4 -
-
REALISASI FISIK (%)
( Rp)
%Terkontrak
% Realisasi thdp Dipa
5
6
7
-
-
Thdp DIPA
-
Thdp KONTRAK 8
Bidang Kelembagaan
42,278,030,000
33,836,688,600
9,032,995,278
26.70
21.37
462196
Peningkatan Sarana dan Prasarana Kantor Pemerintahan Nias
42,278,030,000
33,836,688,600
9,032,995,278
26.70
21.37
31.48
1 2 3 4 5 6 7 8 9 10 11
III 459033 459064 459192 459203 462030 462052 464175 464162 464250 464595 440759
Bidang Perumahan,Infrastruktur & Tataguna Lahan Pembinaan Perencanaan Jalan Sumut Rehabilitasi dan Rekonstruksi Jalan Propinsi Sumut Rehabilitasi dan Rekonstruksi Jalan Kabupaten Nias Rehabilitasi dan Rekonstruksi Jalan Kabupaten NiSel Pengembangan Perumahan dan Pemukiman Nias dan Nias Selatan Pengembangan Kinerja Pengelolaan Air Minum dan Air Limbah Nias Pengembangan Daerah Rawa dan Pengamanan Pantai Wilayah Nias Pengendalian Banjir dan Pengamanan Pantai Nias Irigasi Wilayah Nias Peningkatan Kualitas Jasa Ketenaga Listrikan Nias Pemel.Rehab,Peningkatan Pembangunan SarPras Transportasi Nia
946,654,120,000 66,995,800,000 109,490,160,000 24,855,000,000 24,410,900,000 536,548,500,000 34,044,552,000 23,674,000,000 35,831,700,000 24,264,754,000 21,485,222,000 45,053,532,000
702,165,578,502 34,942,639,492 105,300,705,720 23,991,110,627 19,240,851,639 377,984,995,000 17,827,031,800 8,402,719,000 32,514,487,446 23,842,345,531 18,407,921,747 39,710,770,500
287,971,669,383 12,189,486,233 52,566,610,309 12,281,774,127 7,119,030,937 137,284,725,851 6,506,138,408 2,132,670,660 20,634,696,621 8,966,812,807 6,326,291,756 21,963,431,675
41.01 34.88 49.92 51.19 37.00 36.32 36.50 25.38 63.46 37.61 34.37 55.31
30.42 18.19 48.01 49.41 29.16 25.59 19.11 9.01 57.59 36.95 29.44 48.75
16.14 53.00 79.33 39.32 34.36 31.82 17.97 57.66 31.92 63.79 48.91
1
IV 459435
Bidang Pemberdayaan Ekonomi dan Usaha Pemberdayaan Ekonomi dan Usaha Nias
36,355,490,000 36,355,490,000
13,134,303,372 13,134,303,372
5,905,172,939 5,905,172,939
44.96 44.96
16.24 16.24
10.09
27.94 27.94
1
V 462262
Bidang Agama , Sosial dan Budaya Agama , Sosial dan Budaya Nias
39,114,726,000 39,114,726,000
24,504,871,775 24,504,871,775
19,790,463,705 19,790,463,705
80.76 80.76
50.60 50.60
45.55
72.70 72.70
1 2 3
VI 462247 462253 437880
Bidang Pendidikan dan Kesehatan Nias Pendidikan dan Kesehatan Nias Pendidikan dan Kesehatan Nias Selatan Dinas Kesehatan Sumut - ETSP
118,262,775,000 85,710,330,000 24,565,965,000 7,986,480,000
79,015,929,991 59,076,867,472 17,605,439,519 2,333,623,000
36,338,237,072 29,340,404,213 6,713,882,859 283,950,000
45.99 49.66 38.14 12.17
30.73 34.23 27.33 3.56
23.44 19.65 1.28
1
VII 464878
Bidang Sekretariat,Perwakilan Nias,Keuangan,Komunikasi dan Informasi Perwakilan Nias
17,114,600,000 17,114,600,000
11,126,701,000 11,126,701,000
5,027,318,766 5,027,318,766
45.18 45.18
29.37 29.37
29.37
1,199,779,741,000
863,784,073,240
364,065,857,143
42.15%
SISA PAGU DIPA TERHADAP KONTRAK ( 3 - 4 )
335,995,667,760
28.00%
B
SISA NILAI KONTRAK TERHADAP REALISASI ( 4 - 5 )
499,718,216,097
57.85%
C
SISA PAGU DIPA TERHADAP REALISASI KEUANGAN ( 3 - 5 )
835,713,883,857
D
Prosentase Nilai Kontrak Terhadap Nilai PAGU DIPA
72.00%
E
Prosentase Realisasi Keuangan Terhadap PAGU DIPA
30.34%
A
OC-1 Monitoring November 272006 Derin
69.66%
30.34%
9
-
1
TOTAL
KET
39.33
35.56%
39.33 51.52 30.94 55.11 Kontrak Multiyear 82.19 49.88 48.78 60.76 50.62 63.54 32.48 Kontrak Multiyear 74.46 55.49
31.66 34.01 27.42 4.37 Kontrak Multiyear
0.00 48.81
Kurva - S BRR-Perwakilan Nias RENCANA, REALISASI DAN FISIK
PAGU RP. 1.199.779.741.000,-
100.00 90.00 80.00
64.82 % (Minggu ke 4)
70.00
Progres
60.00 50.00 40.00
48.81%
30.00 20.00
30.34%
10.00 0.00 Rencana
1
2
3
4
5
6
Realisasi
6.42
9.12
11.32
14.21
19.46
30.3443911
Fisik lapangan
6.42
9.27
13.45
20.34
36.90
48.81
Bulan ( Mei - Desember ) OC-1_Des_1_06 PMCS Husmeizar
7
6.84697449 13.4736104 20.1002463 28.0555985 42.1234086 64.8214557 89.6626341
8 100
CHART ON BUDGET PER SECTOR 6
x10 600,000
500,000
400,000
300,000
200,000
100,000
-
Rehabilitasi dan Pembinaan Peningkatan Sarana perencanaan Jalan Rekonstruksi Jalan dan Prasarana Propinsi Sumut Sumut pemerintahan Nias
Rehabilitasi dan Rekonstruksi Jalan Kabupaten Nias
Pengembangan Rehabilitasi dan Pengembangan perumahan dan Rekonstruksi Jalan sistem layanan air Kabupaten Nias pemukiman Nias dan minum dan air
Pengendalian banjir Peningkatan kualitas Pemeliharaan,Rehab Pemberdayaan Pengembangan Agama, Sosial dan dan pengamanan Irigasi wilayah Nias ketenagalistrikan ,Peningk.pembangun ekonomi dan usaha daerah rawa dan Budaya Nias Nias an SarPras Trans pantai Nias Nias pengamanan pantai
Pendidikan dan Kesehatan Nias
Pendidikan dan Kesehatan Nias Selatan
Dinas Kesehatan Sumut - ETSP
Perwakilan Nias
Pagu Dipa
42,278
66,996
109,490
24,855
24,411
536,549
34,045
23,674
35,832
24,265
21,485
45,054
36,355
39,115
85,710
24,566
7,986
17,115
N.Kontrak
33,837
34,943
105,301
23,991
19,241
377,985
17,827
8,403
32,514
23,842
18,408
39,711
13,134
24,505
59,077
17,605
2,334
11,127
9,033
12,189
52,567
12,282
7,119
137,285
6,506
2,133
20,635
8,967
6,326
21,963
5,905
19,790
29,340
6,714
284
5,027
Real.Keuangan
SEKTOR
LAPORAN PELAKSANAAN KEGIATAN SATKER ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD - NIAS APBN 2006 (DANA HASIL MONATORIUM Deputi Bidang Sub Bidang Satker Ka. Satker
: Perumahan, Infrastruktur dan Tata Guna Lahan : Pembinaan Perencanaan Jalan Sumut : 459033 : Hotben Doloksaribu, ST
OC 1 STATUS : 22 NOPEMBER 2006
No
Satuan Pelaksana kegiatan / Bagian Pelaksana Kegiatan
K/S
F/N
Lokasi
Vol
Sat
1
2
3
4
5
6
7
Pagu
K/L/P
Nama Perusahaan/No/Tgl Kontrak
Nilai Kontrak (RP)
9
10
11
(Rp)
1 2
ADMINISTRASI UMUM Administrasi Proyek Pengadaan Alat Pengolahan Data
854,400,000 797,360,000 57,040,000
Pengadaan Alat Berat / Alat Bantu 1 2
K
N
Pengadaan Rangka Jembatan / Panel Bridge
K
N
Nias
2 3 4 5 6
Paket - 06, Pengawasan Ruas Jalan Kabupaten Nias Selatan Lanjutan Paket Pengawasan 2005 Paket - 6a, Pengawasan Jalan Propinsi
Paket - 6b, Pengawasan Jalan Kabupaten Nias
Paket - 6c, Pengawasan Jalan
7
20,036,500,000
1
Pkt
20,062,500,000
K
1
Pkt
30,937,500,000
P
K
-
F
Nias
1
Pkt
2,683,423,000
K
K
F
s dan Nias Sela
1
Pkt
2,326,940,000
K
K
F
s dan Nias Sela
1
Pkt
734,690,000
K
K
F
Nias Selatan
1
Pkt
1,274,295,000
K
K
F
Nias
1
Pkt
1,179,805,000
K
K
F
Nias Selatan
1
Pkt
1,089,110,000
K
K
F
Nias Selatan
1
Pkt
216,535,000
K
-
Kabupaten Nias Selatan
K
F
Nias
1
Pkt
175,000,000
K
K
F
Nias Selatan
1
Pkt
125,000,000
K
K
F
Nias
1
Pkt
1,100,000,000
K
-
Paket - 17, Perbantuan Pengawasan Perumahan Satker BRR - Pengembangan
4 5
Paket - 11, Perencanaan Jalan Simplfied Design Nias sepanjang 20.00 Km
6 7
Paket - 12, Perencanaan Jalan Simplfied Design Nias Selatan sepanjang 20.00 Km Paket - 13, Perencanaan Teknik Jembatan -
8
Paket - 14, Perencanaan Teknik Jembatan
9
Paket - 15, Rencana Tata Bangunan dan Lingkungan Kawasan Pusat Kota
10
Teluk Dalam Kabupaten Nias Selatan Paket - 16, Perencanaan Teknik Jembatan Total Jumlah Paket Kontrak Jumlah Paket Swakelola
SPKSPKSPKSPKSPKSPK-
(%)
15
16
Ket 17
20,036,500,000
4,007,300,000
-
4,007,300,000
-
-
-
-
-
-
-
10,782,235,392
5,830,946,567
2,683,423,000
1,354,125,497
50.46
51.80
2,326,940,000
662,404,460
28.47
51.62
734,690,000
334,517,699
45.53
57.04
1,274,295,000
590,519,363
46.34
65.19
1,179,805,000
931,361,156
78.94
84.05
1,089,110,000
863,962,000
79.33
82.88
214,963,106
214,963,106
100.00
100.00
98,120,000
98,120,000
100.00
100.00
97,939,286
97,939,286
100.00
100.00
1,082,950,000
683,034,000
63.07
80.00
4,123,904,100
1,844,455,150
862,990,000
487,871,600
56.53
95.00
868,490,000
173,698,000
20.00
98.00
644,017,000
364,267,200
56.56
90.00
948,502,500
189,700,500
20.00
80.00
49,996,100
49,996,100
100
100.00
49,995,000
49,995,000
100
100.00
49,912,500
49,912,500
100
100.00
49,973,000
49,973,000
100
100.00
600,028,000
429,041,250
71.50
98.00
34,942,639,492
12,189,486,233
-
KU.03.08/SKS/BRR-
PPJSU-1/05 21 Desember 2005, Adendum I PT. Dacrea Mitrayasa KU.03.08/SKS/BRRPPJSU-1/05 21 Desember 2005, Adendum I PT. Arcende KU.03.08/SKS/BRRPPJSU-1/05 21 Desember 2006, Adendum I PT. Pemetar Argeo Consultan SPK-
4,236,602,000
Paket - 07, Perencanaan Teknik Jalan di Kepulauan Nias (Full Design)Sepanjang 85.00 Km Paket - 08, Perencanaan Teknik Jalan Propinsi di kepulauan Nias (Full Design) Sepanjang 85.00 Km Paket - 09, Perencanaan Teknik Jalan Kabupaten Full Design sepanjang 40.00 Km dan Simplfied Design 85.00 Km Paket - 10, Perencanaan Teknik Jembatan Kabupaten Nias
3
(%)
14
12/BRR.459033/VI/06 28 Juni 2006
PERENCANAAN TEKNIK JALAN DAN JEMBATAN
2
PT. Herda Carter Indonesia 01/BRR.459033/VI/06, 07 Juni 2006 PT. Diantama Rekanusa 02/BRR.459033/VI/06 07 Juni 2006 PT. Esconsoil Ensan 03/BRR.459033/VI/06 07 Juni 2006 PT. Eskapindo Matra C.E 04/BRR.459033/VI/06 07 Juni 2006 PT. Dacrea Mitrayasa 05/BRR.459033/VI/06 07 Juni 2006 PT. Indah Karya (Persero) 06/BRR.459033/VI/06 07 Juni 2006 PT. Herda Carter Indonesia
-
Perumahan dan Permukiman Nias
1
PT. Equipindo Perkasa/SPK-14/BRR.459033/XI/06 '06 Nopember 2006
10,904,798,000
Paket - 01, Pengawasan Teknik Jalan Lahewa - Afulu - Sirombu Paket - 02, Pengawasan Teknik Jalan Miga - Sirombu; Miga - Lolowau Paket - 03, Pengawasan Teknik Jalan Gunungsitoli - Teluk Dlam Paket - 04, Pengawasan Teknik Jembatan Propinsi Paket - 05, Pengawasan Ruas Jalan Kabupaten Nias
(Rp) 506,784,516 506,784,516 -
51,000,000,000
Pengadaan Alat Berat STUDY PERENCANAAN TEKNIS PENGAWASAN TEKNIK JALAN DAN JEMBATAN
1
8
Fisik
Realisasi Keuangan
-
K
N
s dan Nias Sela
1
Pkt
867,348,000
K
K
N
Nias
1
Pkt
870,848,000
K
K
N
s dan Nias Sela
1
Pkt
648,406,000
K
K
N
s dan Nias Sela
1
Pkt
950,000,000
K
K
N
Nias
Pkt
50,000,000
K
K
N
Nias Selatan
Pkt
50,000,000
K
K
N
s dan Nias Sela
K
N
Nias Selatan
K
N
Nias Selatan
K 19 0 Jumlah Paket Fisik Jumlah Paket Non Fisik
N
0 19
Keterangan : S = Swakelola (K/S) : K = Kontrak N = Non Fisik (F/N) : F = Fisik (K/L/P) : K = Terkontrak (Paket Kontrak yang sudah diberikan SPMK) : L = Proses Lelang (Paket yang sedang dalam proses pelelangan : P = Persiapan (Paket yang belum melakukan pengumuman lelang)
1 1
1 -
Pkt
50,000,000
K
Pkt
50,000,000
K
Pkt
650,000,000
K
-
50,000,000 66,995,800,000 10,904,798,000 10,904,798,000 4,236,602,000
P
PT. Andalas Graha Hutama 08/BRR.459033/VI/06 23 Juni 2006 PT. Transima Citra Indo Consultan 09/BRR.459033/VI/06 28 Juni 2006 PT. Erdrant Rizki Utama 10/BRR.459033/VI/06 24 Juni 2006 PT. Tribina Matra Carya Cipta 07/BRR.459033/VI/06 23 Juni 2006 CV. Archiplan & ASS 21.a/PER/P.11/BRR/IV/06 08 April 2006 CV. Prima Rancang 22.a/PER/P.12/BRR/IV/06 08 April 2006 CV. Team Archieta 23.a/PER/P.13/BRR/IV/06 12 April 2006 CV. Perca Bangun Persada 24.a/PER./P.14/BRR/IV/06 12 April 2006 PT. Wastu Widyawan 11/BRR.459033/VI/06 28 Juni 2006 -
SPKSPKSPKSPKSPKSPKSPKSPKSPK-
34.88
% R.FISIK THDP PAGU DIPA Kuasa Pengguna Anggaran Satker. BRR - Pembinaan Perencanaan Jalan Sumut
Hotben Doloksaribu, ST NIP : 110034467
30.94
16.14
LAPORAN PELAKSANAAN KEGIATAN SATKER ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN 2006 (DANA HASIL MORATORIUM) Deputi Bidang Sub Bidang SATKER Ka SatKer No
K/S
2
3
F/N 4
LOKASI 5
VOL 6
SAT 7
ADMINISTRASI UMUM Administrasi Proyek
Pengadaan Alat Pengolahan Data 2
Status Bulan : 25 Nopember 2006
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
1 1
Format OC1
: Bidang Kelembagaan : Peningkatan SarPras Pemerintah Nias : 462196 : Hotben Doloksaribu, ST
K
4
K
- Pembangunan /Renovasi Kantor KORAMIL Pembayaran sisa Kontrak pengadilan negeri dan - pengadilan agama
K K
N
1
Paket
F
166,000,000
K
10
1
Paket
2,595,400,000
F
G. Sitoli
1
Paket
1,491,300,000
K
F
G. Sitoli
1,224,700,000
K
K
PT.Jamal Putra SPP15/PPK-AD/BRR-462196/VII/2006 4/7/2006 PT.Bina Tama Sejahtera SPP-16/PPK-AD/BRR-62196/VII/2006 29/6/2006
K
F
G. Sitoli
1
Paket
2,814,400,000
K
K
F
Pembangunan Sarana Prasarana Lingkungan Gedung Melengkapi Sarana untuk mengisi Infrastruktur - pemerintahan Wilayah terkena Bencana
K
N
G. Sitoli
1
Paket
4,000,000,000
PT.Sige Sinar Gemilang SPPO18/BRR-462196/VII/2006 07/7/2006
6,150,000,000 1,500,000,000
Konsultan Perencanaan
N
- Perencanaan Pembangunan Kantor di Kabupaten Nias
K
N
- Perencanaan Pembangunan Kantor di Kabupaten Nias
K
Perencanaan Pembangunan Gedung Kantor / Dinas - Baru Kabupaten Nias
G. Sitoli
G. Sitoli
1
Paket
100,000,000
1
Paket
N
1
Paket
K
N
1
Paket
1,000,000,000
P
Perencanaan Pembangunan Gedung Kantor di - Kabupaten Nias Selatan
K
N
1
Paket
330,000,000
K
Perencanaan Pembangunan Gedung Kantor 26 - Kecamatan di Kabupaten Nias (Pemekaran)
K
N
1
Paket
750,000,000
P
Perencanaan Pembangunan Gedung Kantor / Dinas 14 - Unit Kabupaten Nias Selatan
K
N
1
Paket
1,000,000,000
P
480,000,000
154,850,000
154,850,000
56
100
154,850,000
100
2,387,368,000
1,909,894,400
80
1,551,789,200
65
1,371,856,000
1,371,856,000
100
1,097,484,800
80
2,587,480,000
3,670,000,000
K
K
PT. Aryajasa Rekacipta 008/PPK-D-KP/BRR-462196/IV/2006 4/3/2006 CV. SitimValley Engginering 10/PPK-D.KP/BRR-462196/IV/2006 03/4/206
17
100
72
100 100
517,496,000
1,681,862,000
65
517,496,000
20
50
35
60
1,284,500,000
2,936,000,000
80
1,284,500,000 915,515,000
-
CV.Duta Mulia Persada 07/PPK-RRI/BRR 462196/IV/2006 4/3/2006
Ket.
16
5,366,785,000 2,649,274,000
-
1,450,400,000
K
(%)
(%) 15
71
1,450,400,000 P
4,650,000,000
K
1,135,848,083
3,670,000,000
K
Fisik
Keuangan 14 1,040,698,083 885,848,083
2,587,480,000 PT.Kebun Buana Abadi SPP-17/PPK-AD/BRR-462196/VI/2006 30 Juni 2006
4,000,000,000
- Pembangunan Gedung Khusus LP.Gn.Sitoli (bertahap)
1,747,310,000 1,592,460,000
Fisik 13
1,224,700,000
2,814,400,000
Pembangunan Gedung Khusus
Keu 12
11
PT.Bangun Sukses Mandiri 023/BRR.462196/IV/2006 19/4/2006
Realisasi Keuangan
Nilai Kontrak
12,761,496,000 4,983,924,000
G. Sitoli
Pembangunan Rumah Negara
- Perencanaan Rehabilitasi Stasiun RRI Gunungsitoli
9
NOMOR/TGL KONTRAK
19,270,630,000 5,311,400,000
- Pembangunan Gedung KODIM Nias
- Renovasi Rumah Dinas KODIM / KORAMIL 3
8
K/L/P
1,758,460,000 1,592,460,000
PEMBANGUNAN GEDUNG 1 Pembangunan Gedung Kantor
2
Pagu DIPA
Rencana (%)
NAMA PERUSAHAAN
915,515,000
99,800,000
99,800,000
100
84,830,000
85
100
416,000,000
416,000,000
100
208,000,000
50
100
50,700,000
50,700,000
100
43,095,000
85
100 *)
PT.Billy C onsultant KP/BRR-462196/IV/2006
007/PPK-D4/3/2006
300,000,000
300,000,000
100
150,000,000
50
100 *)
*)
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
No 1
2 Perencanaan Pembangunan Gedung Kantor 10 - Kecamatan di kabupaten Nias Selatan (Pemekaran)
Perencanaan Pembangunan Gedung Kantor dan - Prasarana Gedung KPPN Gunungsitoli
Perencanaan Pembangunan Sarana dan Operasional - LAPAS di Kabupaten Nias dan P.Tello
Perencanaan Pembangunan Kantor dan Rumah Dinas - Kodim/Koramil Nias
- Pengawasan Rehabilitasi Stasiun RRI Gunungsitoli
5
3
F/N 4
K
N
K
N
K
K
K
N
N
LOKASI 5
G. Sitoli
G. Sitoli
G. Sitoli
N
VOL 6
SAT 7
2
- Rehabilitasi Kantor Bagian depan KPPN Gunungsitoli 3
4
5
NAMA PERUSAHAAN NOMOR/TGL KONTRAK
9
10
PT.Amethys Utama 006/PPKD-KP/BRR-462196/IV/2006 4/3/2006
49,300,000
49,300,000
100
41,905,000
85
100
K
CV.Koridor Multi Gatra '06/PPK-LP/BRR-462196/IV/2006 4/3/2006
219,600,000
219,600,000
100
186,660,000
85
100
K
PT.Panca Rancang Pratama '06/PPK-AD/BRR-462196/IV/2006 4/3/2006
236,500,000
236,500,000
100
201,025,000
85
100
K
CV. Gamma '91 23/7/2006
78,500,000
23,550,000
30
CV.Duta Mulia Persada 12/7/2006
34,692,000
10,407,600
30
100
CV. Billindo Engginering Consultan 12/7/2006
35,000,000
10,500,000
30
100
1
Paket
Paket
Paket
220,000,000
240,000,000
80,000,000
69,692,000
1
Paket
370,000,000
K
N
1
Paket
260,000,000
L
K
N
1
Paket
35,000,000
K
K
N
1
Paket
180,000,000
L
K
N
1
Paket
149,830,000
L
19,838,940,000 880,320,000
336
M2
880,320,000
K
F
Pengadaan Perlengkapan Sarana Gedung - Komputer Untuk KPPN Gusit - Printer Untuk KPPN Gusit - AC SPLIT Untuk KPPN Gusit
K K K
N N N
Pengadaan Kendaraan Bermotor Roda-2 - Pengadaan kendaraan Roda-2 untuk KPPN G.Sitoli
K
N
G. Sitoli
182
70
1
M2
M2
Unit
Rehabilitasi Bangunan Gedung Negara
136,500,000
70,000,000
1,792,827,000 478,434,000
K
UD.Karya Umbu SPP-080/PPK-KP/BRR-462196/VII/206 03 Juli 2006
K
CV.Odowa SPP081/PPK-KP/BRR-462196/VII/206 03 Juli 2006
133,980,000
133,980,000
100
K
CV.Taruna Permai Jaya SPP79/PPK-KP/BRR-462196/VII/2006 03 Juli 2006
67,980,000
67,980,000
100
869,880,000
695,904,000
80
201,960,000
143,180,000 48,000,000 32,000,000 63,180,000
P P P
20,000,000 20,000,000
K
18,588,940,000
19,250,000 19,250,000
478,434,000
55
57
107,184,000
80
100
20,394,000
30
100
100
100
35
63
127,578,000
-
UD.Putra Exos
75
-
18,211,296,200 869,880,000
206,500,000
G. Sitoli
17
K
1
Ket.
16
50,000,000
N
F
Fisik (%)
(%) 15
Paket
K
K
Realisasi Keuangan Keuangan 14
1
1
G. Sitoli
11
Fisik 13
P
K
F
Keu 12
*)
994,830,000
K
Rencana (%) Nilai Kontrak
400,000,000
Pembang.Prasarana & sarana lingkungan Gedung Rehabilitasi Kantor bagian samping dan belakang KPPN - Gunungsitoli
8
K/L/P
Paket
REHABILITASI BANGUNAN GEDUNG NEGARA Pembangunan Gedung Kantor 1 Rehabilitasi / Pembangunan Gedung KPPN - Gunungsitoli
Pagu DIPA
1
Perencanaan Umum - Pengawasan Pembangunan Kantor di Kabupaten Nias Pengawasan Pembangunan Kantor di Kabupaten Nias - Selatan Pengawasan Pembangunan Gedung Kantor dan - Prasarana KPPN Gunungsitoli Pengawasan Pembangunan Sarana dan Operasi Lapas - Nias & Pulau Tello Pengawasan Pembangunan Gedung Kantor dan Rumah - Kodim / Koramil Nias
3
K/S
-
19,250,000
100
17,120,206,200
19,250,000 19,250,000 1,167,565,000
Fa.Puramot Jaya
SPP019/PPK-RRI/BRR-462196/VII/2006
- Rehabilitasi Stasiun RRI Gunungsitoli
K
F
G. Sitoli
1
Unit
- Rehabilitasi / Pembangunan Kantor di Kabupaten Nias
2,828,940,000
K
07/7/2006
9,120,000,000
2,387,500,000
1,910,000,000
80
9,066,204,000
835,625,000 331,940,000
CV.Deli Karya Indah SPP-093/PPK-KP/BRR-462196/VII/2006
- Pembangunan Kantor BPS Gunungsitoli
K
F
G. Sitoli
1
Unit
570,000,000
K
- Pembangunan Kantor Lurah Ilir Gununtsitoli - Kantor Bupati Nias (bertahap)
K K
F F
G. Sitoli G. Sitoli
1 1
Unit Unit
430,000,000 4,500,000,000
K K
07/7/2006 CV.Trimatra Usaha Konstruksi
499,000,000
399,200,000
80
219,560,000
44
65
374,600,000 4,256,504,000
299,680,000
80
112,380,000
30
65
SPP-094/PPK-KP/BRR-462196/VII/2006
07/7/2006 PT. Untaria Metalindo
SPP/SPMK Akhir Agustus
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
No 1
2 - Kantor DPRD Nias (bertahap) - Kantor Perwakilan BRR Nias (Lanjutan) - Kantor Camat Gunung Sitoli - Kantor Camat Lahewa - Rehabilitasi /Pembang.Kantor di Kabupaten Nisel - Pembang.Rung Kerja Bupati, Wakil & Sekda Nisel - Pembangunan Kantor Dinas Parawisata Kab.Nisel - Pembangunan Pasar Teluk Dalam - Pembangunan Kantor Camat Kota Teluk Dalam - Pembang.Ktr Sektariat Bersama BRR Kab. Nisel
4 1
2
3
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
NAMA PERUSAHAAN NOMOR/TGL KONTRAK
Rencana (%)
3 K K K K
4 F F F F
5 G. Sitoli G. Sitoli G. Sitoli Lahewa
6 1 1 1 1
7 Unit Unit Unit Unit
8 1,220,000,000 1,200,000,000 600,000,000 600,000,000
9 K K K K
10 PT. Devara Karya Mulia CV. Bernado CV. Gading Asia Mas CV. Welling
11 1,388,000,000 1,002,600,000 738,100,000 807,400,000
K K K K K
F F F F F
T. Dalam T. Dalam T. Dalam T. Dalam T. Dalam
1 1 1 1 1
Unit Unit Unit Unit Unit
6,640,000,000 1,600,000,000 1,876,000,000 1,586,000,000 978,000,000 600,000,000
K K K K K
CV. Risma Karya CV. Torpana PT. Sinar Teknik Baru CV. Mutiara Jaya CV. Indah Karya
5,666,502,200 1,358,500,000 1,714,000,000 1,341,265,200 871,630,000 381,107,000
PEMBINAAN SARANA DAN PRASARANA Pengadaan Perlengkapan Sarana Kantor
1,410,000,000 1,280,000,000
Realisasi Keuangan
Fisik
Keuangan 14
(%)
Nilai Kontrak Keu 12
Fisik 13
(%) 15
17 SPP/SPMK Akhir Agustus SPP/SPMK Akhir Agustus SPP/SPMK Akhir Agustus SPP/SPMK Akhir Agustus
SPP/SPMK Akhir Agustus di batalkan SPP/SPMK Akhir Agustus SPP/SPMK Akhir Agustus SPP/SPMK Akhir Agustus
1,116,586,400 1,086,586,400
832,685,195 802,685,195
- Pembangunan Sarana Operasional LAPAS Gunungsitoli
K
F
G. Sitoli
1
Pkt
630,000,000
K
CV.Perjuangan SPP-19/BRR-462196/VII/2006 5Juli 2006
553,915,000
553,915,000
100
443,132,000
80
98
Pembangunan Tembok Pagar Keliling untuk Cabang - Rutan Pulau Tello
K
F
P. Tello
1
Pkt
650,000,000
K
CV.Sahabat Baru SPP-20/BRR-462196/VII/2006 5 Juli 2006
532,671,400
532,671,400
100
359,553,195
67.5
90
Pengadaan Meubeler - Pengadaan Meubeler Cab.Rutan Pulau Tello
K
N
100,000,000
P
K
N
30,000,000
K
30,000,000
30,000,000
100
30,000,000
100
100
9,032,995,278 21.37 8,147,147,195 % Real.Fisik thdp PAGU 7,027,532,195 1,119,615,000
39.33
Pengadaan Kendaraan Bermotor Roda-2 Pengadaan Kendaraan Operasional roda 2 untuk - LAPAS Gunungsitoli dan Pulau Tello TOTAL Jumlah Paket Kontrak Jumlah Paket Swakelola
Keterangan : (K / S) : K (F / N) : F (K / L / P ) : K (K / L / P) : L (K / L / P) : P
48 Jumlah Paket Fisik Jumlah Paket Non Fisik
2
23 25
= Kontrak, S = Swakelola = Fisik, N = Non Fisik = Terkontrak (Paket Pekerjaan Yang Sudah Diberikan SPK) = Proses Lelang (Paket Yang Sudah Melakukan Pelelangan) = Persiapan (Paket Yang Belum Melakukan Pengumuman Pelelangan
Unit
UD.Putra Exos S-47/BRR.462196/SPK/2006 22 Mei 2006
42,278,030,000 40,685,570,000
33,836,688,600 32,244,228,600
33,081,560,000 7,604,010,000
30,520,036,600 1,724,192,000
Ket.
16
31.48
Ka. Satker BRR - Pnk. Sapras Kantor Pemerintahan Nias
Hotben Doloksaribu, ST Nip : 110043467
LAPORAN PELAKSANAAN KEGIATAN SATKER ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN 2006 (DANA HASIL MORATORIUM) Deputi Bidang Sub Bidang SATKER Ka SatKer No
: Bidang Perumahan,Insfrastruktur & Tataguna Lahan : Rehabilitasi dan Rekonstruksi Jalan Propinsi Sumut : 459064 : Ir.BuyungSitompul,MT PROYEK / BAGIAN PROYEK KEGIATAN PAKET
K/S
2
3
1
Format OC1 Status Bulan : 25 Nopember 2006
F/N LOKASI VOL 4
5
6
SAT 7
1 ADMINISTRASI UMUM Administrasi Proyek Pengadaan Alat Pengolahan Data
Pagu DIPA 8
K/L/P 9
NAMA PERUSAHAAN 10
88,250,000,000
1
K
F
1
Pkt
6,000,000,000
K
2
Rehabilitasi Rekonstruksi Moi - MandreheSirombu
K
F
1
Pkt
9,612,500,000
K
3
Pembangunan Jalan Gunungsitoli - Lahewa Afulu (Lanjutan)
K
F
1
Pkt
3,250,000,000
K
4
Pembangunan Jalan Gunungsitoli - Binaka
1
Pkt
3,000,000,000
K
5
Pembangunan Jalan Miga - Moi
1
Pkt
8,000,000,000
K
6
Pembangunan Jalan Lahusa -Teluk Dalam Lolowau ( Lolowau - Teluk Dalam )
K
F
1
Pkt
6,000,000,000
K
7
Rehab Rekons Jln G.Sitoli-TuhemberuaLahewa
K
F
1
Pkt
19,000,000,000
K
8
Rehab Rekons Jln.Moi-Lolowau-Sirombu
K
F
1
Pkt
22,000,000,000
K
9
Rehab Rekons Lahusa - Teluk Dalam Lolowa'u
K
F
1
Pkt
2,100,000,000
K
#
Rehab Rekons Binaka - Lahusa
K
F
1
Pkt
1,530,000,000
K
#
Rehab Rekons Gunungsitoli - Binaka 1
K
F
1
Pkt
1,657,500,000
K
#
Rehab Rekons Tuhemberua (Sp. Lotu) Lahewa
K
F
1
Pkt
1,650,000,000
K
#
Rehab Rekons Miga - Moi 1
K
F
1
Pkt
2,350,000,000
K
K
F
1
Pkt
2,100,000,000 19,908,000,000
K
PT. Cipayung SK1690/BRR-459064/VIII/2006 04 Agustus 2006 PT.AdiAnugrah Jaya Abadi SK-777/BRR-459064/V/2006 5 Mei 2006 PT. Gunung Mega Jaya SK1691/BRR-459064/VIII/2006 04 Agustus 2006 PT. Cipayung SK1811/BRR-459064/VIII/2006 23 Agustus 2006 PT. Hastatunggal Persadabhakti SK-1812/brr-459064/VIII/2006
1
Pembangunan Jembatan Siwalawa I , Siwalawa II da Lahusa
K
F
1
Pkt
10,500,000,000
K
2
Rehap / Rekon Jembatan Oyo
K
F
1
Pkt
8,608,000,000
K
K
F
1
Pkt
800,000,000 109,490,160,000
K
Rehab Rekons Jembatan Lahusa Km. 78+000 TOTAL Jumlah Paket Kontrak Jumlah Paket Swakelola Jumlah Paket Fisik Jumlah Paket Non Fisik
Keterangan : (K / S) : K (F / N) : F (K / L / P ) : K (K / L / P) : L (K / L / P) : P
Nilai Kontrak
Rencana (%)
Addendum I
Keu 13
12
1,331,600,000 1,302,600,000 29,000,000
Pembangunan Jalan Gunungsitoli-LolowauSirombu (Lanjutan)
3
11
1,332,160,000 1,302,600,000 29,560,000
2 Peningkatan Jalan Arteri
Rehab Rekons Lahewa - Afulu # 3 Pembangunan Jembatan
Nilai Kontrak Awal
NOMOR/TGL KONTRAK
Fisik 14
Realisasi Keuangan ( RP ) 15
DIPA (%) Kontrak (%) 16
582,773,935 553,773,935 29,000,000
43.75 42.51 98.11
43.76 42.51 100.00
= Kontrak, S = Swakelola = Fisik, N = Non Fisik = Terkontrak (Paket Pekerjaan Yang Sudah Diberikan SPK) = Proses Lelang (Paket Yang Sudah Melakukan Pelelangan) = Persiapan (Paket Yang Belum Melakukan Pengumuman Pelelangan
Nilai Fisik Thdp Kontrak (Rp)
Est. Penyerapan s/d 31 Desember 2006
17 43.747 42.513 98.106
582,224,544 553,773,935 28,450,609 52,272,229,173
Rencana
Sisa Anggaran
18
19
1,331,600,000 1,302,600,000 29,000,000 87,170,006,720
Ket. 20
560,000 0 560,000
309,998,166,440
87,170,006,720
44,837,756,513
50.81
51.44
5,704,689,000
5,704,689,000
3,999,534,961
66.66
70.11
84.000
4,791,938,760
5,704,689,000
295,311,000
1,079,993,280
24,264,218,000
9,612,500,000
7,426,791,844
77.26
30.61
23.984
5,819,530,045
9,612,500,000
0
3,149,106,000
3,149,106,000
1,222,478,014
37.61
38.82
71.000
2,235,865,260
3,149,106,000
100,894,000
2,846,685,000
2,846,685,000
1,129,261,604
37.64
39.67
53.000
1,508,743,050
2,846,685,000
153,315,000
7,589,709,000
7,589,709,000
1,517,941,800
18.97
20.00
24.090
1,828,360,898
7,589,709,000
410,291,000
5,879,817,720
5,879,817,720
0
0.00
0.00 100.000
5,879,817,720
5,879,817,720
120,182,280
31,044,960,000
19,000,000,000
11,067,497,167
58.25
35.65
44.000
13,659,782,400
19,000,000,000
0
34,475,398,000
22,000,000,000
18,474,251,123
83.97
53.59
48.000
16,548,191,040
22,000,000,000
0
19,840,337,000
2,100,000,000
-
0.00
0.00
0.000
0
2,100,000,000
0
14,477,209,000
1,530,000,000
-
0.00
0.00
0.000
0
1,530,000,000
0
15,868,034,000
1,657,500,000
-
0.00
0.00
0.000
0
1,657,500,000
0
15,741,141,000
1,650,000,000
-
0.00
0.00
0.000
0
1,650,000,000
0
21,954,728,000
2,350,000,000
-
0.00
0.00
0.000
0
2,350,000,000
0
19,992,128,000 18,130,699,000
2,100,000,000 18,130,699,000
7,146,079,861
0.00
0.00
0.000
0 5,753,966,706
2,100,000,000 11,274,146,500
0 8,633,853,500
9,505,536,000
9,505,536,000
2,483,104,813
23.65
26.12
14.000
1,330,775,040
5,323,100,160
5,176,899,840
7,865,049,000
7,865,049,000
4,510,952,248
52.40
57.35
54.000
4,247,126,460
5,190,932,340
3,417,067,660
760,114,000 328,128,865,440
760,114,000 105,300,705,720
152,022,800 52,566,610,309
Tahun Tunggal
Multi Year
Tahun Tunggal
Tahun Tunggal
23
Agustus 2006 PT.Subur Sari Lasdrerich 122/ BRR-RRJ-SU / XII / 2005 12 Desember 2005 PT.Duta Graha Indah SK-775/BRR-459064/V/2006 5 Mei 2006 PT.Tulung Agung SK-776/BRR-459064/V/2006 5 Mei 2006 PT.Tulung Agung SK2543/BRR-459064/XI/2006 17 Nopember 2006 PT.Tulung Agung SK2540/BRR-459064/XI/2006 17 Nopember 2006 PT. Duta Graha Indah SK2538/BRR-459064/XI/2006 17 Nopember 2006 PT. Gorip Nanda Guna SK-2541/BRR-459064/XI/2006 17 Nopember 2006 PT. Teras Bermutu SK2539/BRR-459064/XI/2006 17 Nopember 2006 PT. Triple's SK2542-BRR-459064/XI/2006 17 Nopember 2006 PT.Adhi Karya SK-778/BRR-459064/V/2006 5 Mei 2006 PT.Adhi Karya SK-779/BRR-459064/V/2006 5 Mei 2006 CV. Dua Ribu SK2083/BRR-459064/IX/2006 21 September 2006
Tahun Tunggal
Tahun Tunggal
Multi Year
Multi Year
Multi Year
Multi Year
Multi Year
Multi Year
Multi Year
Multi Year
Usulan Multi Year
Usulan Multi Year
19.00 20.00 23.163 48 49.920473 55.1052
17 0 17 0
Fisik (%)
%REALISASI FISIK THDP DIPA
52.996722
176,065,206 760,114,000 58,026,195,879 99,775,753,220.00
39886000 Tahun Tunggal 9,714,406,780
LAPORAN PELAKSANAAN KEGIATAN SATKER ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN 2006 Deputi Bidang
: Bidang Infrastruktur, Lingkungan dan Pemeliharaan
Sub Bidang
: Rehabilitasi dan Rekonstruksi Jalan Kabupaten Nias
SATKER
: 459192
Ka SatKer
: Mesachi Zebua, S.IP
No
NAMA PERUSAHAAN
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
K/S
2
3
1 1
Format OC1 Status Bulan :
F/N
LOKASI
4
5
VOL 6
SAT 7
8
ADMINISTRSI UMUM
835,400,000
Administrasi Proyek
795,340,000
Pengadaan Alat Pengolahan Data 2
Pagu DIPA
9
Pemeliharaan Periodik Jalan Ruas Awa'ai - Bogali - Lotu Kecamatan Tuhemberua/ Lotu, Pemeliharaan jalan ruas Sawö - Botombawö Kecamatan Tuhemberua (Lanjutan) Rehabilitasi jalan ruas Pasar Baru Lölömoyo dhi, dimulai dari
5
K
F
Kec. Idanögawo/ Gidö
K
F
Kec. Namöhalu/ Tuhemberua/Lotu
1.00
Pkt
1,342,650,000
K
1.00
Pkt
2,061,370,000
K
6
7
3
UD. Imbun 008/SPP/BRR/SATKER-N/I/2006 19 Januari 2006 PT. Mitra Perdana
Rencana (%)
11
Keu
Fisik
12
13
( RP )
%
(%)
14
15
16
F
Kec. Sirombu
1.00
Pkt
1,129,150,000
K
Mandrehe (Lanjutan)
K
F
Kec. Mandrehe
1.00
Pkt
416,350,000
K
F
Kec. Gunungsitoli
1.00
Pkt
236,250,000
K
Kecamatan Hiliduho/Tuhemberua (Lanjutan)
K
F
Kec. Hiliduho
1.00
Pkt
515,850,000
K
Rehabilitasi Berat Jalan Ruas Gunung Tua - Ononamölö Talafu dhi. Dimulai dari Ononamolo Talafu Kecamatan Persiapan Tugala Oyo, Pemeliharaan Periodik Jalan Ruas Larumae - Sinarikhi - Fadoro Lauru + 1 Jembatan Belly Bentang 30 m Kecamatan Hiliduho (Lanjutan)
K
F
Kec. Alasa/ Hiliduho
1.00
Pkt
1,296,500,000
K
53.18
795,340,000
404,799,500
50.90
38,800,000
38,800,000
100.000
100.000
6,997,965,027
1,109,702,190
10.098
97.383
-
100.000
25.270
100.000
1,342,623,707
100.000
2,061,363,553
100.000
-
19 Januari 2006 PT. Bintang Agung
520,909,895
19 Januari 2006 CV. Sang saka 007/SPP/BRR/SATKER-N/XII/2006 23 Desember 2005 PT. Wincom Karya Utama
1,129,129,602
100.000
-
416,301,548
100.000
-
19 Januari 2006 CV. Gading Asia Mas 006/SPP/BRR/SATKER-N/XII/2006 23 Desember 2005 PT. Sagala & SON
236,250,000
100.000
-
515,805,191
100.000
-
1,296,491,426
100.000
19 Januari 2006
17,021,480,000
16,159,005,600
1 2
Peningkatan Jalan Dalam Kota Gunungsitoli Peningkatan Jalan Ruas Hilina'a - Alasa Kecamatan
K
F
Kec. Gunungsitoli
1.00
Pkt
5,789,600,000
K
Gunungsitoli/Alasa Pemeliharaan Jalan Ruas Botombawö - Lölöana'a Kecamatan
K
F
Kec. Gunungsitoli
1.00
Pkt
3,834,880,000
K
3
Hiliduho Pemeliharaan Jalan Ruas Awa'ai - Bogali - Lotu Kecamatan
K
F
Kec. Hiliduho
1.00
Pkt
1,000,000,000
K
4
1.00
Pkt
1,000,000,000
K
Tuhemberua/Lotu
K
F
Kec. Tuhemberua/ Lotu
5
Lanjutan Pembangunan Ruas DAO - AFIA Kecamatan Lahewa
K
F
Kec. Lahewa
1.00
Pkt
1,000,000,000
K
6 7
Pembangunan Badan Jalan yang longsor ruas Lahewa - Afulu Lanjutan Rehabilitasi Jalan Ruas Dahana - Tumöri Balöhili + Gunungsitoli - Faekhu + Hiliwöria - Onozikhö Kecamatan Gunungsitoli (Ex Pemutusan Kontrak)
K
F
Kec. Lahewa
1.00
Pkt
3,000,000,000
K
K
F
Kec. Gunungsitoli
1.00
Pkt
1,397,000,000
K
24,855,000,000
TOTAL Paket Kontrak
14
Paket Swakelola
0
-
*)
Putus Kontrak Sesuai Surat Nomor: S.807/BRR.459192/IX/2006 Tanggal 11 September 2006
*)
Putus Kontrak Sesuai Surat Nomor: S.727/BRR.459192/VIII/2006 Tanggal 24 Agustus 2006
83.780
100.000
Proses Pembayara n
100.000
-
100.000
PT. Cipayung SPP.02/BRR.459192/V/2006 31 Mei 2006 PT. Cipayung SPP.03/BRR.459192/V/2006 31 Mei 2006 UD. Karya Umbu SPP.05/BRR.459192/V/2006 31 Mei 2006 UD. Karya Umbu SPP.04/BRR.459192/V/2006 31 Mei 2006 CV. Tujuh Serangkai SPP.06/BRR.459192/V/2006 12 Juni 2006 PT. BUDI GRAHA SPP.07/BRR.459192/X/2006 18 Oktober 2006 PT. BUDI GRAHA SPP.08/BRR.459192/XI/2006 03 November 2006
588,792,295
45.414
100.000
10,728,472,437
61.365
79.846
5,498,529,000
100.000
4,852,451,843
88.250
99.000
3,800,380,900
100.000
3,463,800,166
91.144
99.500
968,774,300
100.000
674,373,477
69.611
72.905
929,016,400
100.000
824,966,563
88.800
100.000
994,965,000
100.000
912,880,388
91.750
100.000
2,702,340,000
100.000
-
22.600
1,265,000,000
100.000
23,991,110,627
-
-
12,281,774,127
14
n Fisik
0 Gunungsitoli, 25 November 2006 Keterangan : N = Non Fisik
(K / L / P ) : K = Terkontrak (Paket Pekerjaan Yang Sudah Diberikan SPK) (K / L / P) : L = Proses Lelang (Paket Yang Sudah Melakukan Pelelangan) (K / L / P) : P = Persiapan (Paket Yang Belum Melakukan Pengumuman Pelelangan)
-
34.500
51.193
82.185
%R.FISIK THDP PAGU DIPA
t Fisik
: K = Kontrak, S = Swakelola
Proses Pembayara n
012/SPP/BRR/SATKER-N/I/2006
Pembangunan Jalan dan Jembatan Lokal (2006)
: F = Fisik,
17
443,599,500
011/SPP/BRR/SATKER-N/I/2006 K
(K / S)
Ket.
834,140,000
010/SPP/BRR/SATKER-N/I/2006 K
(F / N)
Fisik
Realisasi Keuangan
Nilai Kontrak
009/SPP/BRR/SATKER-N/I/2006
Onolimbu - Lölöwa'u Kecamatan Sirombu (Lanjutan) Pembangunan Jalan Ruas Lölöhia - Lasarafaga Kecamatan
Rehabilitasi Jalan Ruas Gunungsitoli - Faekhu Kecamatan Gunungsitoli, Rehabilitasi Jalan Ruas Dahana - Tumöri Balöhili Kecamatan Gunungsitoli, Lanjutan Pembangunan Jalan Ruas Hiliwöria - Onozikhö Kecamatan Gunungsitoli (Lanjutan) Lanjutan Pembangunan Jalan Ruas Alo'oa menuju Simpang Lima
10
6,998,120,000
Bawadasi Kec. Sirombu, Rehabilitasi Peningkatan Jalan Ruas 4
NOMOR/TGL KONTRAK
CV. SAHABAT SPK.07/BRR.459192/VI/2006 08 Juni 2006
40,060,000
Pembangunan Jalan dan Jembatan Lokal (2005) 1 Pemeliharaan periodik jalan ruas Tetehösi - Bozihöna, Kecamatan Idanogawo, Rehabilitasi jalan dalam Kota Gidö, Rehabilitasi Jalan ruas Sogae'adu - Sifaoro'asi Kecamatan Gidö (Lanjutan) 2 Rehabilitasi jalan ruas Hilindruria - Namöhalu Kecamatan Namöhalu,
3
K/L/P
25 November 2006
An. KEPALA SATUAN KERJA SEMENTARA
KEPALA SATUAN KERJA SEMENTARA
BRR-REHABILITASI DAN REKONSTRUKSI
BRR - REHABILITASI DAN REKONSTRUKSI
JALAN KABUPATEN NIAS Mewakili,
MESACHI ZEBUA, S. IP Penata TK. I NIP. 400029560
JALAN KABUPATEN NIAS
79.328759
LAPORAN PELAKSANAAN KEGIATAN SATKER ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN 2006 Deputi Bidang Sub Bidang SATKER Ka SatKer No 1
Format OC1
: Bidang Perumahan,Insfrastruktur & Tataguna Lahan : Rehabilitasi dan Rekonstruksi Jalan Kabupaten Nias Selatan : 459203 : Ir. Muh Insal U. Maha, MSc PROYEK / BAGIAN PROYEK KEGIATAN PAKET 2
Status Bulan : 24 November 2006 K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
3
4
5
6
7
8
1 ADMINISTRASI UMUM Administrasi Proyek Pengadaan Alat Pengolahan Data
NAMA PERUSAHAAN NOMOR/TGL KONTRAK 10
916,900,000 876,840,000 40,060,000
Nilai Kontrak (Awal ) 11.00
Nilai Kontrak 12
Sisa Tender
Rencana (%) Keu Fisik 13 14
Realisasi Keuangan ( RP ) % 15 16
916,900,000.00 876,840,000.00 40,060,000.00
476,803,410 437,103,410 39,700,000
Fisik (%) 17
Ket. 18
49.85 99.10
2 Pembangunan Jalan dan Jembatan Lokal 1
Peningkatan Jalan Ruas Jalan GOMOSAFALAGO-SUSUA-AMOROSA
2
Peningakatan Ruas Jalan BAWODABARAHILIFALAGO-SIWALAWA-HILINAWALO FAU
3
F
Kec. Gomo
2000
M
1,447,000,000
CV. LEDY
1,302,000,000.00
145,000,000
0
0
F
Kec. Teluk Dalam
3500
M2
2,100,000,000
PT. SINAR BARU UNGGULAN K74/BRR-459203/SPP/VI/2006 22 Juni 2006
1,890,000,000.00
210,000,000
36.86
40.089
Rehabilitasi dan Pelebaran dan Peningkatan Jalan Ruas Jalan Teluk Dalam-Hilimondrege
F
Kec. Teluk Dalam
1200
M
1,000,000,000
CV. MITRA JAYA
900,000,000.00
100,000,000
4
Rehabilitasi dan Pelebaran dan Peningkatan Jalan Ruas Jalan Simpang AUGEBAWOLAHUSA-MAZINGO
F
Kec. Teluk Dalam
2000
M
1,600,000,000
UD. MASA KARYA
1,465,000,000.00
135,000,000
0
5
Rehabilitasi Berat dan Peleb Jalan Kelling Pulau Tello
F
Kec. Pulau-Pulau Batu
3179
M
1,150,000,000
PT. WINDA PRATAMA KARYA
1,050,000,000.00
100,000,000
6
Peningkatan Jalan Ruas Eho - Tebolo
K
F
Kec. Hibala
2100
M
1,858,740,000
CV. SAHABAT K-074/BRR.459203/SPP/VI/2006 22 Juni 2006
1,818,691,639.26
40,048,361
7
Peningkatan Jalan Ruas SOLEDUA - TOGIZITA - BAWOSALO'O - SEMBULU
K
F
Kec. Lolowau/Lolomatua
M
2,300,000,000
CV.Ledy
8
Rehab dan Peningk. Simp Jalan KM 19 Prov.Orahili -Bawonahono
1,600,000,000
PT.Tisa Lestari K-075/BRR.459203/SPP/VI/2006
9
Rehab dan Peningk. Simp Jalan KM 28 Prov.Orahili -Bawonahono
2,000,000,000
PT.Kasih Citra Timur BELUM ADA KONTRAK
10
Rehab dan Peningkatan ruas jln dari Hilizihono Bawomataluo - Siwalawa
K
F
Kec. Teluk Dalam
2700
M
3,150,000,000
PT.Perkutut 602.2/048.1/SPP INDUK/BRRNISEL/II/2006 10 Februari 2006
3,150,000,000.00
-
73.27
100
1,358,053,200
43.11
66.59
Progress sedang dihitung oleh Konsultan PT. Indah Karya dan Kontraktor
11
Rehabilitasi Berat Jalan Ruas Helezalulu Gomo
K
F
Kec. Lahusa
7035
M
3,140,000,000
PT.JAYA MITRA KONSTRUKSI 602.2/048.2/SPP INDUK/BRRNISEL/II/2005 10 Februari 2006
3,140,000,000.00
-
85.05
100
1,992,518,400
63.46
81.31
Progress sedang dihitung oleh Konsultan PT. Indah Karya dan Kontraktor
12
Rehabilitasi dan Peningkatan Ruas Jalan Sisaraholi Oyo - Lolomatua (Lanjutan)
K
F
Kec. Lolomatua
3000
M
1,162,321,000
CV.Cahaya Baru 602.2/048.3/SPP INDUK/BRRNISEL/II/2006 10 Februari 2006
1,162,321,000.00
-
74.4
100
637,742,455
54.87
68.00
Progress sedang dihitung oleh Konsultan PT. Indah Karya dan Kontraktor
K
K
F
Kec. Teluk Dalam
3500
M
Kec. Teluk Dalam
260400000
378,000,000
20
20.00
0.00
0.00
0
0.00
0.00
0
0
210000000.00
20.00
45.48
45.275
699643398.96
38.47
14.00 Sedang dalam tahap pelaksanaan
33.83
Uang muka tidak bisa dicairkan karena belum ada persetujuan tahun jamak dari Deputi Keuangan dan Perencanaan BRRNAD NIAS dan sedang diusulkan kembali Uang muka akan diproses minggu depan karena belum ada persetujuan tahun jamak 15.03 dari deputi keuangan dan perencanaan NADNIAS tgl 13 nov'06 34.14
3.71 Sedang dalam tahap pelaksanaan Sedang dalam Test Case Show Cause 59.88 Meeting Tingkat Proyek Tender batal karena hanya ada satu penawaran
2,300,000,000 1,460,000,000.00
140,000,000
38.64
47.028
530,949,440
36.37
2,000,000,000
Menunggu diterbitkan Addendum Pekerjaan 47.50 Jembatan .Bobot jembatan 40%
42.00 BELUM ADA KONTRAK
CV.Mentari Jasa Mulia 602.2/065/SPP INDUK/BRR13
Rehabilitasi dan Pelebaran d Ruas Jalan Lagundri - Kompleks Sorake
TOTAL Jumlah Paket Kontrak Jumlah Paket Swakelola
K
F
Kec. Teluk Dalam
1650
M
985,939,000
17 Februari 2006
24,410,900,000 13 0 Jumlah Paket Fisik Jumlah Paket Non Fisik
Keterangan : (K / S) : K = Kontrak, S = Swakelola (F / N) : F = Fisik, N = Non Fisik
-
NISEL/II/2006
13 0
985,939,000.00
19,240,851,639.26
100
5,170,048,361
100
574,920,633
7,119,030,937
% Realisasi Fisik thdp DIPA (K / L / P ) : K = Terkontrak (Paket Pekerjaan Yang Sudah Diberikan SPK) (K / L / P) : L = Proses Lelang (Paket Yang Sudah Melakukan Pelelangan) (K / L / P) : P = Persiapan (Paket Yang Belum Melakukan Pengumuman Pelelangan
Sedang dalam Test Case Show Cause Meeting Tingkat Deputi
58.31
37.00
100.00
49.88
39.32
Menunggu serah terima dari TIM PEMBERESAN ke Satker yang baru sampai dengan hari ini belum ada kejelasannya sehingga tidak dapat turun TIM PHO.
LAPORAN PELAKSANAAN KEGIATAN SATKER ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN 2006 (DANA HASIL MORATORIUM) Deputi Bidang Sub Bidang SATKER Ka SatKer No
: Bidang Perumahan, Insfrastruktur & Tataguna Lahan : Pengembangan Perumahan dan Pemukiman Nias : 462030 : Ir. Busmin Siagian
PROYEK / BAGIAN PROYEK PAKET
1 1
KEGIATAN
2
15218405
Form
OC.1 OC-1
15218405 Status Bulan : 11 - 18 Nopember 2006
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
3
4
5
6
7
8
9
ADMINISTRASI UMUM
NAMA PERUSAHAAN NOMOR/TGL KONTRAK 10
3,995,700,000
- Administrasi Proyek
Nilai Kontrak Awal
Nilai Kontrak
Rencana (%)
ADDENDUM I
Keu
Fisik
( RP )
%
(%)
12
13
14
15
16
11 3,589,200,000
3,573,700,000
Realisasi Keuangan
Fisik
1,502,306,511
3,529,200,000
1,268,906,511
a. Honor Pegawai dan staf
635,700,000
b. Sewa Kendaraan
344,400,000
c. Sewa Rumah
135,000,000
d. Inventaris Kantor
70,000,000
e. Lelang Panitia
37,950,800
f. Langganan Listrik, Air dan Telepon
2,892,011
g. ATK Satker dan PPK
24,686,500
h. SPPD
18,277,200
- Pengadaan Alat dan Mesin
422,000,000
CV. ASEAN UTAMA
60,000,000
60,000,000
005/SPK/BRR-N/Perkim/III/2006 20 Maret 2006 CV. ASEAN UTAMA
50,000,000
009/SPK/BRR-N/Perkim/VI/2006 19 JUNI 2006 UD MOHAGA
74,600,000
007/SPK/BRR-N/Perkim/VI/2006 Juni 2006 UD. PASCALIS
48,800,000
010/SPK/BRR-N/Perkim/VII/2006 17 Juli 2006
UANG PERSEDIAAN
2
89,520,000
PENYUSUNAN PROGRAM DAN RENCAN KERJA / TEKNIS / PROGRAM
6,659,000,000
3,995,690,000
1,155,917,900
Jasa Konsultan - Konsultan Perencana Paket 1 Kab. Nias
1
659,000,000 PT. CAIL INDONESIA
269,957,000
269,957,000
100.00
46.T/KTR/BRR.N/PPP/2006 14 Maret 2006 - Konsultan Perencana Paket 2 Kab Nias Selatan
3
3,000,000,000
- Konsultan Pengawasan Kab. Nias dan Nias Selatan
1
1,000,000,000 PT. LYDUMA INTERMAS
748,550,000
1,076,900,000
224,565,000
30
685,465,000
205,639,500
30
746,075,000
223,822,500
30
233.5/KTR/BRR-PPPN/VI/2006 12 Juni 2006 PT. MISKAT ALAM KONSULTAN 233.4/KTR/BRR-PPPN/VI/2006 12 Juni 2006 CV. GRAHA PURNA KARYA CONSULTANT 233.3/KTR/BRR-PPPN/VI/2006 12 Juni 2006 PT. DWI BINA PRAKARSA 233.2/KTR/BRR-PPPN/VI/2006
772,530,000
Ket./KONSULTAN SUPERVISI 17
No
PROYEK / BAGIAN PROYEK PAKET
1
KEGIATAN
2
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
3
4
5
6
7
8
9
NAMA PERUSAHAAN NOMOR/TGL KONTRAK 10
Nilai Kontrak Awal 11
Nilai Kontrak
Rencana (%)
ADDENDUM I
Keu
Fisik
Realisasi Keuangan ( RP )
%
(%)
12
13
14
15
16
Fisik
12 Juni 2006 PT. PUTERA DUA KONSULTAN
773,113,000
231,933,900
30
233.1/KTR/BRR-PPPN/VI/2006 12 Juni 2006
- Konsultan Pengawasan Kab. Nias dan Nias Selatan Tahap II
3
PENGADAAN TANAH
4
PENANGANAN PASCA BENCANA ALAM & KERUSUHAN
2
2,000,000,000
100000
10,000,000,000
515,893,800,000
370,400,105,000
134,626,501,440
36.35
SOSIAL 1. Belanja Barang Operasional Lainnya
2,443,300,000
Penserifikatan Tanah - Pengukuran Bidang Tanah
1,559,500,000 5000
BID
600,000,000
- Pengumpulan Data Yuridis
5000
BID
550,000,000
- Sidang Panitia dan Penyiapan SK
5000
BID
67,500,000
- Pembukuan Hak
5000
BID
87,500,000
- Penerbitan Sertipikat
5000
BID
37,500,000
1
LS
108,625,000
- Verifikasi data dan Pengumuman
5000
BID
17,500,000
- Kendali Mutu Pendaftaran tanah Sistematik
5000
BID
37,500,000
- Pengadaan Formulir / Blangko / Daftar Isian
1
PKT
5,000,000
- Penyiapan Alas hak termasuk materai
1
LS
25,000,000
- Pengadaan Patok Batas (11000 bh)
- Pencetakan Peta Bidang Untuk Pengumuman
250
lbr
875,000
- Penjilidan Warkah,Buku Tanah dan SU
300
set
22,500,000
- ATK/ Bahan Penunjang Komputer Tim
2
PKT
4,000,000
- Map, Box File @ odner
2
PKT
6,000,000
- 2 Perlengkapan Basecamp Tim Ajudikasi
2
PKT
68,600,000
- Perlengkapan Basecamp Tim Ajudikasi
1
PKT
31,600,000
- Langganan Air Minum (2 tim)
2
PKT
4,200,000
- Biaya Listrik / Operational Genset (2 tim)
10
BLN
15,000,000
- Biaya telepon / komunikasi Lainnya (2 tim)
12
BLN
24,000,000
- Pramuwisma (5 tim, 2 PIU repr, 1 PIU)
48
BLN
38,400,000
- Petugas Keamanan (5 tim, 2 PIU repr, 1 PIU x 6 bln)
48
BLN
43,200,000
- Petugas Pematokan (2 tim x 3 org x 6)
36
OB
28,800,000
Pendukung Persertipikatan
20
OB
30,000,000
- 150 Pembuatan TDT orde 3
150
TTK
570,000,000
- Pembuatan Tugu Orde 4
100
TTK
20,000,000
2. Belanja Modal, Peralatan dan Mesin
1,290,000,000
Peralatan Pengukuran dan Pemetaan
1,220,000,000
Genset
-
-
70,000,000
3. Gedung dan Bangunan
500,000,000 1
Pkt
Pembangunan Rumah Baru Kabupaten Nias
5197
UNIT
Tahun Anggaran 2006
4903
4. Lembaga Sosial Lainnya
- Pembangunan Rumah Baru ( ABT ) Nias
-
883,800,000
- Petugas Kecamatan
- Renov Gedung Kantor Pertanahan Kab Nias
-
500,000,000
443,660,500,000
370,400,105,000
134,626,501,440
259,850,000,000
242,752,900,000
66,211,413,335
30.34
Ket./KONSULTAN SUPERVISI 17
No
PROYEK / BAGIAN PROYEK PAKET
1
KEGIATAN
2
1 Olora
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
3
4
5
6
7
8
9
10
G.Sitoli
28
Unit
K
PT. Bangunan Indah Perumahan
1,400,000,000 -
G.Sitoli
109
Unit
5,450,000,000
8
Unit
400,000,000
21
Unit
1,050,000,000
10
Unit
500,000,000
11
Unit
550,000,000
10
Unit
500,000,000
6
Unit
300,000,000
17
Unit
850,000,000
20
Unit
1,000,000,000
6
Unit
300,000,000
19
Unit
950,000,000
11
Unit
550,000,000
14
Unit
700,000,000
5
Unit
250,000,000
8
Unit
400,000,000
6
Unit
300,000,000
5
Unit
250,000,000
6
Unit
300,000,000 -
100
652,339,000
70.44
78.349
CV.Benediksien
441,000,000
100
100
441,000,000
100.00
100
PT CAIL INDONESIA
CV.Poppy
485,100,000
100
100
485,100,000
100.00
100
PT CAIL INDONESIA
CV.Ceria
100
100
435,677,000
100
PT CAIL INDONESIA
264,600,000
100
100
124,362,000
47
PT CAIL INDONESIA
749,700,000
100
100
562,275,000
75.0
100
PT CAIL INDONESIA
100
100
878,117,000
100.0
100
PT CAIL INDONESIA
264,600,000
100
100
105,840,000
40.0
64
PT CAIL INDONESIA
863,000,000
100
100
768,933,000
89.1
90.241
PT CAIL INDONESIA
500,500,000
100
100
500,500,000
100
PT CAIL INDONESIA
627,200,000
100
100
313,600,000
55.1
PT CAIL INDONESIA
224,000,000
100
100
224,000,000
100
PT CAIL INDONESIA
358,400,000
100
100
358,400,000
100
PT CAIL INDONESIA
264,600,000
100
100
79,380,000
100
PT CAIL INDONESIA
226,000,000
100
100
226,000,000
100
PT CAIL INDONESIA
264,600,000
100
100
264,600,000
100
PT CAIL INDONESIA
441,000,000
435,677,000
100.0
.
47.00
CV.Sahabat Sukses Mandiri
CV.Madala Agung Perkasa
882,000,000
878,117,000
CV.Marni
CV.Tunas Muda
CV.Anugrah Putra
100.00
UD.Sinar Kasih
50.0
CV.Riwu
100.00
CV.Memori
100.0
CV.Saro Anugrah Mulia
30.00
CV.Felix
100.0
24.T/KTR/BRR.N/PPP/2006
G.Sitoli
100
14 Maret 2006 K
19 Mudik
926,100,000
32.T/KTR/BRR.N/PPP/2006
Gido
CV. Ladarith
14 Maret 2006 K
18 Bawodesolo
100
18.T/KTR/BRR.N/PPP/2006
G.Sitoli
75.0
14 Maret 2006 K
17 Sifalaete Tab
274,800,000
39.T/KTR/BRR.N/PPP/2006
G.Sitoli
100
14 Maret 2006 K
16 Luana Laraga
100
42.T/KTR/BRR.N/PPP/2006
G.Sitoli
WAKTU 366,400,000
14 Maret 2006 K
15 Hilina'a,Madolaoli
CV. Node
SUDAH DILAKSANAKAN SCM & ADA PERPANJANGAN
44.T/KTR/BRR.N/PPP/2006
G.Sitoli
11.125
14 Maret 2006 K
14 Dahana
30.35
30.T/KTR/BRR.N/PPP/2006
Bawolato
1,482,051,200
14 Maret 2006 K
13 Hiliwarokha(6),Hiliganaita(3)Sisarahili(1)Gazamanu(1)
100
28.T/KTR/BRR.N/PPP/2006
I.gawo/G
CV.Asean Utama
14 Maret 2006 K
12 Teehosi,Bozihona,Soewe,Sirete
100
11.71
23.T/KTR/BRR.N/PPP/2006
G.Sitoli
4,883,200,000
17
0.0
14 Maret 2006 K
11 Kec.Ilir
100
03.T/KTR/BRR.N/PPP/2006
G.Sitoli
100
14 Maret 2006 K
10 Kec.Ilir
1,254,400,000
Ket./KONSULTAN SUPERVISI
33.T/KTR/BRR.N/PPP/2006
G.Sitoli
16
14 Maret 2006 K
9 Kec.Ilir
15
37.T/KTR/BRR.N/PPP/2006
G.Sitoli
14
14 Maret 2006 K
8 Mudik
13
04.T/KTR/BRR.N/PPP/2006
G.Sitoli
12
Fisik
14 Maret 2006 K
7 Kec.Ilir
(%)
35.T/KTR/BRR.N/PPP/2006
G.Sitoli
%
14 Maret 2006 K
6 Kec.Ilir
( RP )
11
Realisasi Keuangan
25.T/KTR/BRR.N/PPP/2006
G.Sitoli
Fisik
14 Maret 2006 K
5 Kec.Ilir
Keu
21.T/KTR/BRR.N/PPP/2006
G.Sitoli
Rencana (%)
ADDENDUM I
14 Maret 2006 K
4 Lasara
Nilai Kontrak
45.T/KTR/BRR.N/PPP/2006
Sirombu
Nilai Kontrak Awal
14 Maret 2006 K
3 Orahili
NOMOR/TGL KONTRAK
26.T/KTR/BRR.N/PPP/2006
2 Dahana
NAMA PERUSAHAAN
K/S
14 Maret 2006 K
CV.Purnama 27.T/KTR/BRR.N/PPP/2006
100.00
PROYEK / BAGIAN PROYEK PAKET
No 1
KEGIATAN
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
3
4
5
6
7
8
9
2
20 Hiliweto
G.Sitoli
8
Unit
400,000,000
K
10
Unit
500,000,000
10
Unit
500,000,000
8
Unit
400,000,000
6
Unit
300,000,000
8
Unit
400,000,000
4
Unit
200,000,000
8
Unit
400,000,000
9
Unit
450,000,000
22
Unit
1,100,000,000
10
Unit
500,000,000
10
Unit
500,000,000
10
Unit
500,000,000
10
Unit
500,000,000
5
Unit
250,000,000
100
192,640,000
43.0
43.442
PT CAIL INDONESIA
CV.Amena
441,000,000
100
100
95
PT CAIL INDONESIA
UD. Mega Raya
357,000,000
100
100
357,000,000
100.00
100
PT CAIL INDONESIA
CV.Tiara Jaya Sakti
273,000,000
100
100
200,627,700
73.49
100
PT CAIL INDONESIA
CV.Yasen
358,400,000
100
100
358,400,000
100.00
100
PT CAIL INDONESIA
CV.Mutiara Jaya
179,200,000
100
100
179,200,000
100.0
100
PT CAIL INDONESIA
CV.Taruna Permai Jaya
358,400,000
100
100
358,400,000
100.0
100
PT CAIL INDONESIA
CV.Devianindo Binangun Persada
403,200,000
100
100
403,200,000
100.00
100
PT CAIL INDONESIA
CV.Cipta Bangun Perkasa
970,200,000
100
100
921,690,000
95.00
100
PT CAIL INDONESIA
CV.Brilyan
447,000,000
100
100
447,000,000
100.00
100
PT CAIL INDONESIA
CV.Lagundri Star
452,000,000
100
100
372,900,000
82.50
100
PT CAIL INDONESIA
CV.Mulia Utama
448,000,000
100
100
448,000,000
100.0
100
PT CAIL INDONESIA
CV.Berkat
441,000,000
100
100
441,000,000
100.0
100
PT CAIL INDONESIA
220,500,000
100
100
220,500,000
100.0
100
PT CAIL INDONESIA
95.15
5,819,731,200
20.T/KTR/BRR.N/PPP/2006
G.Sitoli
100
14 Maret 2006 K
34 Sisarahili Sisambualahe
448,000,000
31.T/KTR/BRR.N/PPP/2006
G.Sitoli
CV.Polaris Sakti Pratama
14 Maret 2006 K
33 Mudik
PT CAIL INDONESIA
07.T/KTR/BRR.N/PPP/2006
G.Sitoli
100
14 Maret 2006 K
32 Tumori Batohili
100.0
38.T/KTR/BRR.N/PPP/2006
G.Sitoli
361,600,000
14 Maret 2006 K
31 Lewuogura
100
01.T/KTR/BRR.N/PPP/2006
G.Sitoli
100
14 Maret 2006 K
30 Iraono,Lasara Sowu,Tetehosi afia,Awa'ai
361,600,000
41.T/KTR/BRR.N/PPP/2006
G.Sitoli
CV.Sararali
14 Maret 2006 K
29 Ilir
17
19.T/KTR/BRR.N/PPP/2006
G.Sitoli
Ket./KONSULTAN SUPERVISI
14 Maret 2006 K
28 Dahana
16
02.T/KTR/BRR.N/PPP/2006
G.Sitoli
15
14 Maret 2006 K
27 Dahana
14
05.T/KTR/BRR.N/PPP/2006
G.Sitoli
13
14 Maret 2006 K
26 Dahana
12
Fisik
29.T/KTR/BRR.N/PPP/2006
G.Sitoli
(%)
14 Maret 2006 K
25 Dahana
%
43.T/KTR/BRR.N/PPP/2006
I.Gawo
( RP )
14 Maret 2006 K
24 Tetehosi
Realisasi Keuangan
40.T/KTR/BRR.N/PPP/2006
G.Sitoli
Fisik
14 Maret 2006 K
23 Boya
Keu
36.T/KTR/BRR.N/PPP/2006
G.Sitoli
Rencana (%)
ADDENDUM I
14 Maret 2006 K
22 Boya
11
Nilai Kontrak
22.T/KTR/BRR.N/PPP/2006
G.Sitoli
10
Nilai Kontrak Awal
14 Maret 2006
21 Luahafaraga
NAMA PERUSAHAAN NOMOR/TGL KONTRAK
14 Maret 2006 K
CV.Karya Bersama
-
34.T/KTR/BRR.N/PPP/2006
-
14 Maret 2006
KUALIFIKASI BESAR DAN MENENGAH 1
-
Saombo, Desa Iraonogeba, Moawo, Saewe, Fadoro Lasa K
F
Nias
225
Unit
11,250,000,000
K
PT. TARA MULIA SETIA
Mudik, Sisarahili Gamo, Kelurahan Pasar, Kelurahan Ilir, Boyo
-
PRATAMA LUHUR
Kecamatan Gunungsitoli Kabupaten Nias
-
05/P2P/BRR/APBN/2006
2 Sogae'du, Hilisebua, Lauri, Tumori Sebua, Orahili Tumori,
K
F
Nias
300
Unit
15,000,000,000
53.89
57.647
PT. DWI BINA PRAKARSA (MC I, II, III) Juli, Agustus, September 06
21 Juni 2006 K
PT. ALPHA RHO DELTA
Lolowonu Nikaotano, Sihareo Siwahili, Hilina'a, Simandraolo,
-
38/P2P/BRR/APBN/2006
Sisobahili, Sisobahili Tabaloho, Hili Baruzo, Tumori Balohili
-
26 JUNI 2006
Sifalaete, Fodo, Sihareo II Tab, Fadoro Lasara, Ilir Kec. G. Sitoli
10,800,000,000
14,625,000,000
85.228
2,925,000,000
20.00
25.711
PT. DWI BINA PRAKARSA
No
PROYEK / BAGIAN PROYEK PAKET
1
KEGIATAN
NAMA PERUSAHAAN
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
3
4
5
6
7
8
9
10
K
F
Nias
225
Unit
K
PT. KARYA PUTRA MANDAILING
2
NOMOR/TGL KONTRAK
Nilai Kontrak Awal 11
Nilai Kontrak
Rencana (%)
ADDENDUM I
Keu
Fisik
Realisasi Keuangan ( RP )
%
(%)
12
13
14
15
16
Fisik
Ket./KONSULTAN SUPERVISI 17
Sisobahili, Dima Kec. Hiliduho Kabupaten Nias 3 Desa Olora, Onozitoloi Olora, Hiligodu, Hilimbowo, Teluk B
11,250,000,000
Gawu-Gawu Bouso, Afia, Tetehosi Afia, Lolomoyo Kec. G.Sitoli
-
NATAL
Kabupaten Nias
-
15/P2P/BRR/APBN/2006
4 Desa Hilimbowo Ma'u, Duria, Onombongi, Lolofaoso, Lolo
K
F
Nias
230
Unit
Hili'uso, Hilimbuasi, Ambukha Kec. Lolofitu Moi Kabupaten Nias
11,500,000,000
K
F
Nias
290
Unit
Maziaya, Fulolo, Hilidundra, Hiligodu, Hiligeo Afia, Dahadano F
Nias
225
Unit
Paket (01.01.09.001) 7 Desa Sawo, Lasara Sawo, Sisarahili, Hiliduruwa, Onozitoli S
K
F
Nias
240
Unit
11,250,000,000
PT. LINCE ROMAULI RAYA
PT. DUTA UTAMA SUMATERA
10.414
PT. DWI BINA PRAKARSA
11,615,000,000
98.023
2,323,000,000
20.00
29.477
PT. MISKAT ALAM KONSULTAN
14,790,000,000
87.59
2,958,000,000
20.00
35.93
PT. PUTERA DUA KONSULTAN
11,700,000,000
56.722
2,340,000,000
20.00
1.205
PT. MISKAT ALAM KONSULTAN
06/P2P/BRR/APBN/2006 23 JUNI 2006 K
PT ULI ARTHA
-
11/P2P/BRR/APBN/2006
-
21 JUNI 2006
12,000,000,000
20.00
23 JUNI 2006 K
K
2,160,000,000
27/P2P/BRR/APBN/2006
-
Kecamatan Lotu Kabupaten Nias 6 Mandrehe Besar kec. Mandrehe (225 rumah)
14,500,000,000
92.429
22 JUNI 2006 K
5 Desa Lolofaoso, Lawira Satua, Lawira I, Lawira II, Lolombo
10,800,000,000
K
PT. BUDI GRAHA PERKASA
Ombolata Sawo Kecamatan Sawo, desa Siheneasi, Pasar
-
16/P2P/BRR/APBN/2006
Lahewa, Muzoi, Ombolata Kec. Lahewa, desa Esiwa, Lasara,
-
23 JUNI 2006
PUTUS KONTRAK 12,480,000,000
96.654
5,033,832,960
40.34
53.087
PT. PUTERA DUA KONSULTAN (MC I, II, III) Juli, Agustus, September 06
Namohalu, Orahili Kecamatan Namohalu Kabupaten Nias 8 Desa Ononamolo Tumula, Kecamatan Alasa Kabupaten
K
F
Nias
95
Unit
4,750,000,000
K
9 Desa Fulolo, Ombolata Dahana Tugala Oyo, Fabaliwa
K
F
Nias
96
Unit
(Harefanaese) Kecamatan Alasa Kabupaten Nias
4,800,000,000 -
K
F
Nias
140
Unit
7,000,000,000
PT. BINATAMA SEJAHTERA
CV. FAISAL KONTRAKTOR 28/P2P/BRR/APBN/2006
kec. Alasa (140 rumah) Paket (01.01.01.005)
-
23 JUNI 2006
F
Nias
61
Unit
3,050,000,000
K
K
F
Nias
100
Unit
Zega, Mondrali Kec. Idanogawo kabupaten Nias
5,000,000,000 -
K
F
Nias
38
Unit
Bawolato Kabupaten Nias
1,900,000,000
F
Nias
58
Unit
Paket (01.01.03.001) 15 Desa Siwalubanua, Sifalaete, Hilimbawadesolo, Dahana
K
F
Nias
47
Unit
Humene Satua Kec. Gido Kab. Nias
2,900,000,000
F
Nias
110
Unit
F
Nias
74
Unit
Kabupaten Nias.
K
3,700,000,000
Nias
88
Unit
Hilihambawa, Hilimbawadesolo, Tuhegeo I, Siwalubanua II, F
Nias
90
Unit
4,500,000,000
K
F
Nias
65
Unit
FA. PURAMOT JAYA
PT. PERMATA ALAMSYAH
PT. MITRA PERSADA JAYA
1,470,000,000
20.00
5.06
PT. PUTERA DUA KONSULTAN PUTUS KONTRAK
3,187,250,000
54.798
637,450,000
20.00
33.459
CV. GRAHA PURNA KARYA C.
5,150,000,000
77
1,030,000,000
20.00
27.431
CV. GRAHA PURNA KARYA C.
1,843,000,000
76.921
368,600,000
20.00
56.582
CV. GRAHA PURNA KARYA C.
2,798,500,000
91.5
559,700,000
20.00
3.76
CV. GRAHA PURNA KARYA C. PUTUS KONTRAK
2,279,500,000
43.59
455,900,000
20.00
40.332
CV. GRAHA PURNA KARYA C.
5,390,000,000
63.347
1,078,000,000
20.00
41.869
CV. GRAHA PURNA KARYA C.
3,774,000,000
63.29
754,800,000
20.00
36.197
CV. GRAHA PURNA KARYA C.
4,444,000,000
57.773
888,800,000
20.00
56.656
CV. GRAHA PURNA KARYA C.
4,365,000,000
95.19
873,000,000
20.00
22.455
PT. DWI BINA PRAKARSA
3,136,250,000
92.429
627,250,000
20.00
22.932
PT. DWI BINA PRAKARSA
23 JUNI 2006 K
CV. SINONDANG 04/P2P/BRR/APBN/2006 20 JUNI 2006
K
PT. BUDI GRAHA PERKASA
-
UTAMA
-
21/P2P/BRR/APBN/2006
3,250,000,000
95.382
12/P2P/BRR/APBN/2006
20 Boyo, Hilina'a kecamatan Gunungsitoli, Desa Fadoro Lau
7,350,000,000
23 JUNI 2006 K
K
PT. PUTERA DUA KONSULTAN
20/P2P/BRR/APBN/2006
-
Simanaere Kec. Gido Kabupaten Nias 19 Faekhu, Lolofaoso, Fodo Kecamatan Gunungsitoli Kab. N
4,400,000,000
34.911
23 JUNI 2006 K
F
20.00
19/P2P/BRR/APBN/2006
-
18 Desa We'a-We'a, Bawadesolo, Dahana, Lasara Idanoi, Te K
CV. HARAPAN INSANI 23 JUNI 2006
K
PT. BENHAR JAYA MANDIRI
-
17 Desa Hiliweto, Lolozasai, Saewe, Sirete, Umbu Kecamata
PT. NAGA MAS PERMAI
29/P2P/BRR/APBN/2006
5,500,000,000
998,400,000
23 JUNI 2006 K
K
95.3
18/P2P/BRR/APBN/2006
16 Desa Somi Dusun I - IV, Kecamatan Gido Kab. Nias
PT. NUNUT KARYA
2,350,000,000
4,992,000,000
24 JUNI 2006 K
K
PT. PUTERA DUA KONSULTAN
39/P2P/BRR/APBN/2006
14 Tulumbaho sekitarnya kec. Gido (58 rumah)
10.627
21 JUNI 2006 K
13 Hiliwarokha, Tetehosi, Hilihoru, Sisobahili Iraonohura Kec.
20.00
07/P2P/BRR/APBN/2006
12 Desa Sitolu Banua, Orahili, Siofa'ewali Kec. Bawolato, Hilio
992,750,000
26 JUNI 2006 K
K
94.697
43/P2P/BRR/APBN/2006
Sibohou I, II, III, Dahana Tugalaoyo sekitarnya 11 Desa Sifaoroasi Uluhao, Siofa Banua Kec. Bawolato Kab.
4,963,750,000
23 JUNI 2006 K
10 Ononazara, Gunung Tua, Lahembowo, Fulolo, Banua
UD. MASA KARYA 17/P2P/BRR/APBN/2006
23 JUNI 2006 K
PT. MULIA PERKASA
No
PROYEK / BAGIAN PROYEK PAKET
1
KEGIATAN
2
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
3
4
5
6
7
8
9
Hiligodu Tanoseo Kec. Hiliduho Kabupaten Nias
K
F
Nias
50
Unit
Kecamatan Gunungsitoli Kab. Nias
2,500,000,000 -
K
F
Nias
80
Unit
Gunungsitoli, Simanaere Kec. Gunungsitoli Idanoi Kabupaten F
Nias
24
Unit
Kabupaten Nias.
1,200,000,000
K
F
Nias
85
Unit
F
Nias
70
Unit
Onolimbu, Tiga Serangkai, Lologundre, Sisombambowo, K
31/P2P/BRR/APBN/2006
Nias
130
Unit
La'aya, Umbubalodano, Botolakha Dsn II, Botolakha Dsn III Kec.
6,500,000,000
F
Nias
48
Unit
Kec. Tuhemberua Kabupaten Nias
2,400,000,000
(%)
12
13
14
15
16
Fisik
Ket./KONSULTAN SUPERVISI 17
2,375,000,000
95.15
475,000,000
20.00
25.398
PT. DWI BINA PRAKARSA
3,860,000,000
73.14
772,000,000
20.00
29.6
PT. DWI BINA PRAKARSA
1,170,000,000
100
4,292,500,000
53.31
3,570,000,000
-
49.099
PT. MISKAT ALAM KONSULTAN
CV. ASEAN UTAMA
858,500,000
20.00
26.618
CV. GRAHA PURNA KARYA C.
87.3
714,000,000
20.00
23.524
PT. MISKAT ALAM KONSULTAN
6,500,000,000
87.691
1,300,000,000
20.00
19.12
PT. PUTERA DUA KONSULTAN
2,436,000,000
92.398
487,200,000
20.00
16.164
PT. PUTERA DUA KONSULTAN
707,000,000
100
212,100,000
30.00
35.92
PT. MISKAT ALAM KONSULTAN
927,000,000
94.357
278,100,000
30.00
55.242
CV. GRAHA PURNA KARYA C.
23 JUNI 2006 K
PT. FARONATAMA ADI GAMANA 23/P2P/BRR/APBN/2006 23 JUNI 2006
K
CV. SARI RAYA COORPORATION 24/P2P/BRR/APBN/2006
K
%
22/P2P/BRR/APBN/2006
-
Tuhemberua Kabupaten Nias 27 Desa Botolakha Dsn I, Botolakha Dsn II, Botolakha Dusun
3,500,000,000
( RP )
24 JUNI 2006 K
F
CV. DEVIANINDO BINANGUN
-
-
Hiliadulo, Lolowau, Sitolubanua, Kecamatan Lahomi Kab. Nias 26 Desa Banua Gea, Silimabanua, Siofa Banua, Ladara, Alo
PT. MITRA PERDANA
PERSADA
K
Realisasi Keuangan
24 JUNI 2006 K
25 Desa Onowaembo, Bawozamaiwo, Sisobaoho, Iraonoga
CV. FIFO
-
4,250,000,000
Fisik
42/P2P/BRR/APBN/2006
24 Desa Siwahili Kecamatan Idanogawo Kabupaten Nias
Keu
24 JUNI 2006 K
K
Rencana (%)
ADDENDUM I
30/P2P/BRR/APBN/2006
-
Nias 23 Desa Fadoro You, Hiliduho, Lasara Tanoseo Kec. Hiliduho
4,000,000,000
11
Nilai Kontrak
23 JUNI 2006 K
22 Desa Lolomboli, Lololakha, Mazingo, Ombolata Simenari
10
Nilai Kontrak Awal
08/P2P/BRR/APBN/2006
21 Kelurahan Ilir lingk I, Ilir Lingk. III, Ilir Lingk. IV, Ilir Lingk. V
NAMA PERUSAHAAN NOMOR/TGL KONTRAK
23 JUNI 2006 K
PT. UNTARIO MENTALINDO
-
09/P2P/BRR/APBN/2006
-
23 JUNI 2006
28 Desa Hiliwaele II, Hilimbawa, Tuhegafoa I Kecamatan
K
F
Nias
14
Unit
Botomuzoi Kabupaten Nias
700,000,000
K
-
29 Desa Dahana, Kecamatan Bawolato Kab. Nias
30 Hilihoru, Kec. Bawalato Kabupaten Nias
K
K
F
F
Nias
Nias
18
18
Unit
Unit
900,000,000
30 JUNI 2006 K
90/P2P/BRR/APBN/2006
-
30 JUNI 2006
900,000,000
K
F
Nias
18
Unit
900,000,000
F
Nias
10
Unit
500,000,000
F
Nias
18
Unit
900,000,000
F
Nias
10
Unit
500,000,000
F
Nias
10
Unit
500,000,000
F
Nias
13
Unit
650,000,000
F
Nias
17
Unit
850,000,000
F
Nias
16
Unit
800,000,000
147,000,000
30.00
71.741
CV. GRAHA PURNA KARYA C.
CV. KASIH
918,000,000
92.99
275,400,000
30.00
35.338
CV. GRAHA PURNA KARYA C.
CV. DAMAI INDAH
502,500,000
94.87
150,750,000
30.00
68.356
CV. GRAHA PURNA KARYA C.
CV. KARYA BOGALI
505,000,000
95.464
151,500,000
30.00
36.393
CV. GRAHA PURNA KARYA C.
CV. MUTIARA JAYA
637,000,000
93.33
191,100,000
30.00
64.968
CV. GRAHA PURNA KARYA C.
CV. IDAPOLA
862,750,000
74.745
258,825,000
30.00
45.91
CV. GRAHA PURNA KARYA C.
808,000,000
95.464
532,422,712
65.89
64.389
CV. GRAHA PURNA KARYA C.
98/P2P/BRR/APBN/2006
K
95.663
30 JUNI 2006 K
38 Desa Binaka, Kec. Gido Kab. Nias
490,000,000
97/P2P/BRR/APBN/2006
K
CV. ANIS LESTARI
30 JUNI 2006 K
37 Binaka, Kec. Gido Kab. Nias
CV. GRAHA PURNA KARYA C.
96/P2P/BRR/APBN/2006
K
45.858
30 JUNI 2006 K
36 Somi Kecamatan Gido Kabupaten Nias
95.275
95/P2P/BRR/APBN/2006
K
CV. TIARA JAYA SAKTI
30 JUNI 2006 K
35 Desa Hiliwarokha Kec. Bawolato Kab. Nias
CV. GRAHA PURNA KARYA C.
94/P2P/BRR/APBN/2006
K
51.146
30 JUNI 2006 K
34 Desa Sisarahili Kecamatan Bawolato Kabupaten Nias
882,000,000
30.00
93/P2P/BRR/APBN/2006
K
275,400,000
30 JUNI 2006 K
33 Desa Sisarahili, Kecamatan Bawolato Kabupaten Nias
95.583
92/P2P/BRR/APBN/2006
K
918,000,000
30 JUNI 2006 K
32 Desa Hilialawa, Kecamatan Bawolato Kabupaten Nias
CV. CATUR PUTRA AGUNG PERKASA
(Uang Muka)
91/P2P/BRR/APBN/2006
K
CV. KURNIA UTAMA
-
31 Desa Hilialawa, Sisarahili Bawolato Kec. Bawolato Kab. N
UD. ALFANDI 89/P2P/BRR/APBN/2006
30 JUNI 2006 K
CV. SINAR HUMENE
No
PROYEK / BAGIAN PROYEK PAKET
1
KEGIATAN
2
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
3
4
5
6
7
8
9 -
K
F
Nias
15
Unit
750,000,000
F
Nias
18
Unit
900,000,000
42 Desa Tumori Balohili, Tumori, Dahana Kec. Gunungsitoli
K
F
F
Nias
Nias
15
18
Unit
Unit
Kab. Nias
750,000,000
F
Nias
18
Unit
Kabupaten Nias.
30 JUNI 2006 K
900,000,000
F
Nias
10
Unit
500,000,000
Kec. Gunungsitoli Kab. Nias
F
Nias
16
Unit
`
800,000,000
K
Nias
10
Unit
Kecamatan Gunungsitoli Kab. Nias
500,000,000
F
Nias
15
Unit
750,000,000
F
Nias
9
Unit
450,000,000
F
Nias
16
Unit
800,000,000
F
Nias
18
Unit
Idanogawo Kabupaten Nias 51 Tetehosi Kec. Idanogawo Kab. Nias
52 Desa Wango, Kec. Lolofitu Moi Kabupaten Nias
K
K
F
F
Nias
Nias
18
15
Unit
Unit
900,000,000
F
Nias
15
Unit
CV. FELIX
UD. MEGA RAYA
CV. ROMMY
CV. MITRA
UD. MAKMUR
CV. BETZY
CV. GRAHA PURNA KARYA C.
855,000,000
97.08
256,500,000
30.00
78.468
PT. DWI BINA PRAKARSA
712,500,000
100
534,915,075
75.08
85.189
PT. DWI BINA PRAKARSA Termin I
868,500,000
100
260,550,000
30.00
78.102
PT. DWI BINA PRAKARSA
868,500,000
100
260,550,000
30.00
78.221
PT. DWI BINA PRAKARSA
480,000,000
100
144,000,000
30.00
83.88
PT. DWI BINA PRAKARSA
772,000,000
100
231,600,000
30.00
48.124
PT. DWI BINA PRAKARSA
482,500,000
100
61.393
PT. DWI BINA PRAKARSA
723,750,000
100
217,125,000
30.00
35
PT. DWI BINA PRAKARSA
443,250,000
100
132,975,000
30.00
77.6
PT. MISKAT ALAM KONSULTAN
824,000,000
94.1
247,200,000
25.83
59.903
CV. GRAHA PURNA KARYA C.
909,000,000
96.66
432,583,101
47.59
45.689
CV. GRAHA PURNA KARYA C.
30 JUNI 2006 K
UD. MAZIAYA
-
30 JUNI 2006 K
CV. TUNAS MUDA
-
113/P2P/BRR/APBN/2006
-
30 JUNI 2006
750,000,000
82.096
111/P2P/BRR/APBN/2006
K
CV. SOGUNANIA
Termin I 909,000,000
96.739
529,822,467
58.29
64.721
CV. GRAHA PURNA KARYA C. Termin I
772,500,000
100
231,750,000
30.00
45.568
PT. MISKAT ALAM KONSULTAN
772,500,000
100
231,750,000
30.00
41.67
PT. MISKAT ALAM KONSULTAN
134.a/P2P/BRR/APBN/2006
K
CV. USAHA PULIHAN
112/P2P/BRR/APBN/2006
750,000,000
30.00
30 JUNI 2006 K
53 Desa Fadoro, Kecamatan Mandrehe Kab. Nias
CV. LOBOA
900,000,000
229,500,000
109/P2P/BRR/APBN/2006
K
95.327
30 JUNI 2006 K
50 Desa Bobozioli, Maliwa'a, Saiwahili, Tetehosi Kecamatan
765,000,000
108/P2P/BRR/APBN/2006
K
17 Termin I
30 JUNI 2006 K
49 Oladano Dsn I, Oladano Dsn II Kec. Idanogawo Kabupat
Ket./KONSULTAN SUPERVISI
107/P2P/BRR/APBN/2006
K
16
30 JUNI 2006 K
48 Desa Hilimbowo Botomuzoi Kec. Gunungsitoli Kab. Nias
15
106/P2P/BRR/APBN/2006
K
14
30 JUNI 2006 K
47 Desa Madula, Faekhu Kec. Gunungsitoli Kab. Nias
13
105/P2P/BRR/APBN/2006
F
12
Fisik
30 JUNI 2006 K
46 Desa Luaha Laraga, Ononamolo I Lot, Perumnas Eho, Sire
(%)
104/P2P/BRR/APBN/2006
K
%
30 JUNI 2006 K
45 Desa Gada Dsn I, Fadoro Dsn II, Fodo Lorong I, Tumori Ba
( RP )
103/P2P/BRR/APBN/2006
K
CV. TANIA GEMILANG PRATAMA
-
44 Desa Madula, Kec. Gunungsitoli Kab. Nias
CV. POPPY
102/P2P/BRR/APBN/2006
K
Realisasi Keuangan
30 JUNI 2006 K
43 Desa Tumori Balohili, Tumori, Dahana Kec. Gunungsitoli
CV. SARARALI
900,000,000
Fisik
101/P2P/BRR/APBN/2006
K
Keu
30 JUNI 2006 K
41 Desa Sifalaete Tabaloho, Kec. Gunungsitoli Kab. Nias
Rencana (%)
ADDENDUM I
100/P2P/BRR/APBN/2006
K
11
Nilai Kontrak
30 JUNI 2006 K
40 Kelurahan Ilir, Mudik, Kecamatan Gunungsitoli Kabupate
10
Nilai Kontrak Awal
99/P2P/BRR/APBN/2006
39 Desa Baruzo Kec. Gido Kab. Nias
NAMA PERUSAHAAN NOMOR/TGL KONTRAK
30 JUNI 2006 K
CV. RIWU
-
(Uang Muka)
54 Gunung Cahaya, Ombolata, Orahili, Togimbogi Kecama
K
F
Nias
18
Unit
Sirombu Kab. Nias
900,000,000
K
K
F
Nias
17
Unit
Kabupaten Nias
850,000,000 -
K
F
Nias
18
Unit
900,000,000
100
278,100,000
30.00
17.013
PT. MISKAT ALAM KONSULTAN
833,000,000
100
249,900,000
30.00
70.039
PT. PUTERA DUA KONSULTAN
886,500,000
100
7.679
PT. PUTERA DUA KONSULTAN
30 JUNI 2006 K
CV. NITA PRATAMA 117/P2P/BRR/APBN/2006
56 Desa Hambawa Kec. Tuhemberua Kab. Nias
927,000,000
116/P2P/BRR/APBN/2006
55 Desa-Desa Hilimbosi, Hilisalo'o, Tetehosi Maziaya Kec. Sito
CV. MURNI PEMBANGUNAN
30 JUNI 2006 K
CV. ARDIMAN JAYA
-
118/P2P/BRR/APBN/2006
-
30 JUNI 2006
No
PROYEK / BAGIAN PROYEK PAKET
1
KEGIATAN
2
57 Desa Lasara Sowu Dsn II, Lasara Sowu Dsn III, Lasara Sowu
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
3
4
5
6
7
8
9
10
K
F
Nias
18
Unit
K
CV. TATUWU
Dsn IV Kec. Tuhemberua Kab. Nias
900,000,000 -
K
F
Nias
18
Unit
900,000,000
F
Nias
14
Unit
Kabupaten Nias
700,000,000 -
K
F
Nias
18
Unit
900,000,000
62 Desa Siwalu Banua I, Tetehosi I, Awa'ai, Kecamatan Gido
K
F
F
Nias
Nias
10
10
Unit
Unit
Kabupaten Nias 63 Desa Siofabanua Kec. Bawolato Kab. Nias
K
F
Nias
12
Unit
500,000,000
F
Nias
12
Unit
K
F
Nias
12
Unit
Kecamatan Gunungsitoli Kabupaten Nias
124/P2P/BRR/APBN/2006
-
30 JUNI 2006 K
600,000,000
F
Nias
10
Unit
500,000,000
F
Nias
15
Unit
Onowaembo, Madolaoli Kecamatan Gunungsitoli Kab. Nias 68 Desa Bio'uti, Kecamatan Idanogawo Kab. Nias
K
F
Nias
10
Unit
750,000,000
F
Nias
10
Unit
Kecamatan Botomuzoi Kabupaten Nias Nias
11
Unit
K
F
Nias
10
Unit
500,000,000
F
Nias
8
Unit
400,000,000
F
Nias
10
Unit
500,000,000
F
Nias
15
Unit
Kabupaten Nias
750,000,000
Kabupaten Nias
F
Nias
18
Unit
900,000,000 -
274,050,000
30.00
67.767
PT. PUTERA DUA KONSULTAN
675,500,000
100
202,650,000
30.00
80.83
PT. DWI BINA PRAKARSA
868,500,000
100
260,550,000
30.00
83.898
PT. DWI BINA PRAKARSA
480,000,000
95.83
335,173,920
69.83
72.2
PT. DWI BINA PRAKARSA Termin I
492,500,000
93.58
147,750,000
30.00
31.88
CV. GRAHA PURNA KARYA C. (Uang Muka)
612,000,000
95.327
183,600,000
30.00
59.454
CV. GRAHA PURNA KARYA C.
588,000,000
100
176,400,000
30.00
71.859
PT. PUTERA DUA KONSULTAN
570,000,000
100
482,500,000
100
144,750,000
735,000,000
96.985
220,500,000
30.5
PT. DWI BINA PRAKARSA
30.00
56.87
PT. DWI BINA PRAKARSA
CV. FALIERA
30.00
70.625
PT. DWI BINA PRAKARSA
CV. IDANOGAWO
Uang Muka 510,000,000
95.327
502,500,000
100
150,750,000
530,750,000
100
159,225,000
482,500,000
100
402,000,000
100
505,000,000
50.62
757,500,000
51.734
864,000,000
59.6
31.711
CV. GRAHA PURNA KARYA C.
CV. SOTARO
30.00
49.93
PT. MISKAT ALAM KONSULTAN
CV. MESTIKA ABADI
30.00
81.389
PT. DWI BINA PRAKARSA
CV. MEMORI
71.832
PT. DWI BINA PRAKARSA
CV. ROTA
120,600,000
92.16
PT. MISKAT ALAM KONSULTAN
55.598
CV. GRAHA PURNA KARYA C.
47.647
CV. GRAHA PURNA KARYA C.
38.563
PT. DWI BINA PRAKARSA
30.00
133/P2P/BRR/APBN/2006 30 JUNI 2006 K
CV. CITRA BARU 288/P2P/BRR/APBN/2006 25 JULI 2006
K
K
100
30 JUNI 2006 K
CV. RELAWAN
227,250,000
30.00
333/P2P/BRR/APBN/2006
75 Desa Luaha Laraga, Miga, Ononamolo I Lot Kec. G. Sitol
913,500,000
123.a/P2P/BRR/APBN/2006
K
PT. PUTERA DUA KONSULTAN
30 JUNI 2006 K
74 Desa Ahedano Dsn I, Ahedano Dsn II, Ahedano Kec. Ida
29.63
132/P2P/BRR/APBN/2006
K
30.00
30 JUNI 2006 K
73 Hilina'a Tafuo Kecamatan Idanogawo Kabupaten Nias
272,700,000
131/P2P/BRR/APBN/2006
K
100
30 JUNI 2006 K
72 Fadoro Lauru, Hiliduho Kec. Hilidohu Kabupaten Nias
17
909,000,000
130/P2P/BRR/APBN/2006
K
CV. MITRA BINA KASIH
1 JULI 2006
71 Desa Ombolata Simenari Kecamatan Gunungsitoli Kab.
CV. OWUA
-
550,000,000
Ket./KONSULTAN SUPERVISI
30 JUNI 2006 K
F
16
128/P2P/BRR/APBN/2006
-
70 Desa Sifalaete Ulu Kecamatan Gunungsitoli Kabupaten N K
CV. ANUGRAH PRIMA PRATAMA
129/P2P/BRR/APBN/2006
500,000,000
15
30 JUNI 2006 K
K
14
127/P2P/BRR/APBN/2006
69 Desa Hilihambawa, Hiliwaete I, Hiliwaete II, Simanaere
CV. ANIS
500,000,000
13
30 JUNI 2006 K
K
12
Fisik
126/P2P/BRR/APBN/2006
67 Desa Onozitoli Siforoasi, Mudik, Pasar, Sisarahili Sisambual
(%)
30 JUNI 2006 K
K
%
125/P2P/BRR/APBN/2006
66 Mazingo Tabaloho Kecamatan Gunungsitoli Kab. Nias
CV. RATA JAYA
-
K
CV. AGNES 30 JUNI 2006
65 Kelurahan Ilir Lingk. I, Ilir Lingk. II, Ilir Lingk III, Jl. Tirta
CV. YA'AHOWU
-
600,000,000
( RP )
30 JUNI 2006 K
K
CV. MURNI JAYA
123/P2P/BRR/APBN/2006
600,000,000
Realisasi Keuangan
122/P2P/BRR/APBN/2006
64 Desa Hilindruria Kec. Lotu Kabupaten Nias
CV. SETIAWAN
500,000,000
Fisik
30 JUNI 2006 K
K
Keu
121/P2P/BRR/APBN/2006
61 Desa Lasara Bahili, Kecamatan Gunungsitoli Kabupaten
Rencana (%)
ADDENDUM I
30 JUNI 2006 K
60 Desa Madula Kecamatan Gunungsitoli Kabupaten Nias
11
Nilai Kontrak
120/P2P/BRR/APBN/2006
K
Nilai Kontrak Awal
30 JUNI 2006 K
59 Desa Fodo, Gunungsitoli, Luaha Laraga Kec. Gunungsito
NOMOR/TGL KONTRAK
119/P2P/BRR/APBN/2006
58 Desa Hilindruruwa Kecamatan Tuhemberua Kabupaten
NAMA PERUSAHAAN
K/S
25 JULI 2006 K
CV. BENEDIKSIEN
No
PROYEK / BAGIAN PROYEK PAKET
1
KEGIATAN
2
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
3
4
5
6
7
8
9
NAMA PERUSAHAAN NOMOR/TGL KONTRAK 10
Nilai Kontrak Awal 11
Nilai Kontrak
Rencana (%)
ADDENDUM I
Keu
Fisik
Realisasi Keuangan ( RP )
%
(%)
12
13
14
15
16
30.00
35.633
Fisik
Ket./KONSULTAN SUPERVISI 17
76 Desa Onowaembo Kecamatan Gunungsitoli Kabupaten
77 Desa Dahana Tabalaho Kecamatan Gunungsitoli Kab. N
K
K
F
F
Nias
Nias
12
10
Unit
Unit
600,000,000
K
306/P2P/BRR/APBN/2006
-
25 JULI 2006
500,000,000
K
K
F
Nias
10
Unit
500,000,000
F
Nias
12
Unit
Tabaloho Kecamatan Gunungsitoli Kabupaten Nias
600,000,000 -
K
F
Nias
10
Unit
500,000,000
PT. DWI BINA PRAKARSA Uang Muka
475,000,000
100
92.06
PT. DWI BINA PRAKARSA
CV. MARINA
482,500,000
88.357
12.538
PT. DWI BINA PRAKARSA
576,000,000
88.357
87.557
PT. DWI BINA PRAKARSA
477,500,000
74.417
86.246
PT. DWI BINA PRAKARSA
55.592
PT. MISKAT ALAM KONSULTAN
25 JULI 2006 K
CV. YASEN
172,800,000
30.00
318/P2P/BRR/APBN/2006
80 Desa Mudik Kecamatan Gunungsitoli Kab. Nias
173,700,000
315/P2P/BRR/APBN/2006
K
88.357
25 JULI 2006 K
79 Desa Dahana Sogawu-gawu, Perumnas Dahana, Dahan
CV. TARUNA PERMAI JAYA
579,000,000
309/P2P/BRR/APBN/2006
78 Desa Onowaembo Kecamatan Gunungsitoli Kab. Nias
CV. ANDRE
-
30 JUNI 2006 K
CV. BERKAT
K
CV. LIMA SERANGKAI
765,000,000
87.86
PT. PUTRA PANALASA
936,000,000
79.14
280,800,000
30.00
32.57
PT. MISKAT ALAM KONSULTAN
624,000,000
87.432
187,200,000
30.00
29.168
PT. PUTERA DUA KONSULTAN
81 Desa Ambukha, Kec. Lolofitu Moi Kab. Nias
K
F
Nias
15
Unit
750,000,000
26 JULI 2006
82 Desa Sisobawino I, Sisobawino II Kecamatan Lolofitu Moi
K
F
Nias
18
Unit
Kabupaten Nias
900,000,000
K
-
327/P2P/BRR/APBN/2006
83 Desa Balefadorotuho, Kec. Lahewa Kab. Nias
84 Desa Bawasalo'o, Fadoro, Orahili, Sisobandrao, Togimbo
K
K
F
F
Nias
Nias
12
10
Unit
Unit
Tugala Kecamatan Sirombu Kabupaten Nias
600,000,000
25 JULI 2006 K
CV. BINA HARAPAN
-
312/P2P/BRR/APBN/2006
-
25 JULI 2006
500,000,000
K
CV. NODE
Uang Muka 515,000,000
87.92
154,500,000
30.00
46.8
-
PT. MISKAT ALAM KONSULTAN Uang Muka
85 Desa Hilinakhe Kecamatan Gunungsitoli Kab. Nias
K
F
Nias
10
Unit
500,000,000
K
86 Desa Afia, Lasara Sowu, Hambawa Kec. Tuhemberua Ka
K
F
Nias
10
Unit
KUALIFIKASI MENENGAH (TAMBAHAN) 87 Desa Lolowua Dsn I, Lolowua Dsn II, Lolowua Dsn III, Lolow
K
F
Nias
40
Unit
F
Nias
40
Unit
339/P2P/BRR/APBN/2006
-
25 JULI 2006
2,000,000,000
K
2,000,000,000
F
Nias
44
Unit
2,200,000,000
PT. DWI BINA PRAKARSA
505,000,000
88.357
50.344
PT. PUTERA DUA KONSULTAN
K
F
Nias
40
Unit
2,000,000,000
2,020,000,000
100
404,000,000
20.00
45.3
2,020,000,000
100
404,000,000
20.00
51.453
PT. DWI BINA PRAKARSA
2,090,000,000
100
418,000,000
20.00
75.468
PT. DWI BINA PRAKARSA
1,960,000,000
97.775
392,000,000
20.00
50.188
CV. GRAHA PURNA KARYA C.
F
Nias
30
Unit
Nias
1,500,000,000
1,515,000,000
100
303,000,000
20.00
42.885
PT. PUTERA DUA KONSULTAN
Nias
35
Unit
Kabupaten Nias K
F
Nias
22
Unit
1,750,000,000
PT. SARANA ASRI HIDUP TEDUH
CV. RISMA KARYA
1,767,500,000
68.827
353,500,000
20.00
21.01
CV. GRAHA PURNA KARYA C.
86/P2P/BRR/APBN/2006 30 JUNI 2006 K
PT. PANCA KARYA MANDIRI 87/P2P/BRR/APBN/2006
F
CV. LEDY
30 JUNI 2006 K
K
30 JUNI 2006 K
PT. DWI CHINDY ABADI
-
88/P2P/BRR/APBN/2006
-
30 JUNI 2006
1,100,000,000
PT. MISKAT ALAM KONSULTAN
134/P2P/BRR/APBN/2006
K
CV. SAHABAT
30 JUNI 2006 K
-
Kecamatan Gunungsitoli Kabupaten Nias
62.271
85/P2P/BRR/APBN/2006
-
93 Kelurahan Ilir Lingk I t, Ilir Lingk II, Ilir Lingk III, Ilir Lingk IV
30.00
30 JUNI 2006 K
K
Mudik Kec. Gunungsitoli Kabupaten Nias
92 Desa Hilina'a Tafuo, Maliwa'a, Kecamatan Idanogawo
147,000,000
84/P2P/BRR/APBN/2006
-
Kabupaten Nias
91 Desa Fino, Silima Banua Kecamatan Tuhemberua Kabup
CV. KARTIKA
-
K
Dusun II, Lolomoyo Tuhemberua Dsn III, Hiliworia Kec. G. Sitoli
90 Desa Sisarahili, Lauri Kecamatan Gido Kabupaten Nias
88.357
25 JULI 2006 K
-
Kabupaten Nias
89 Desa Sifalaete Tab, Kelurahan Ilir Lorong VIII, Desa Ulumb
490,000,000
-
Dsn IV, Botombawo Dsn I, Botombawo Dsn II Kec. Hiliduho 88 Desa Lolomoyo Tuhemberua Dsn I, Lolomoyo Tuhemberu
500,000,000
CV. AMENA 321/P2P/BRR/APBN/2006
K
CV. MENTARI JASA MULIA 135.a/P2P/BRR/APBN/2006 30 JUNI 2006
Uang Muka 20% 1,045,000,000
100
209,000,000
20.00
68.319
PT. DWI BINA PRAKARSA
No
PROYEK / BAGIAN PROYEK PAKET
1
KEGIATAN
2
NAMA PERUSAHAAN
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
3
4
5
6
7
8
9
10
K
F
Nias
15
Unit
K
CV. WAHANA DARMA
NOMOR/TGL KONTRAK
Nilai Kontrak Awal 11
Nilai Kontrak
Rencana (%)
ADDENDUM I
Keu
Fisik
Realisasi Keuangan ( RP )
%
(%)
12
13
14
15
16
30.00
30.865
Fisik
Ket./KONSULTAN SUPERVISI 17
KUALIFIKASI KECIL (PERUBAHAN TGL 14 JULI 2006) 94 Desa Maliwa'a, Tetehosi Kecamatan Idanogawo Kab. Ni
750,000,000
757,500,000
23.641
227,250,000
CV. GRAHA PURNA KARYA C. Uang Muka
95 Desa Tetehosi Dusun II, Tetehosi Dusun III Kec. Idanogawo
K
F
Nias
15
Unit
750,000,000
K
F
Nias
16
Unit
K
F
Nias
15
Unit
K
CV. GUNA UTAMA
761,250,000
800,000,000
CV. GAPURA
808,000,000
59.198
750,000,000
CV. AVORA
757,500,000
23.412
Kabupaten Nias
96 Desa Bawadesolo, Fadoro, Helefanikha, Hilimbowo, Sifala
6.36
CV. GRAHA PURNA KARYA C.
21.715
CV. GRAHA PURNA KARYA C.
Kec. Gunungsitoli Idanoi Kab. Nias
97 Desa Tetehosi Kec. Idanogawo Kab. Nias
227,250,000
30.00
Uang Muka
98 Desa Fadoro, Fadoro Lauru, Kelurahan Pasar, Kelurahan
K
F
Nias
18
Unit
900,000,000
K
F
Nias
20
Unit
1,000,000,000
149
Unit
1
PKT
1
Unit
CV. OWALO
882,000,000
93.51
16.839
PT. MISKAT ALAM KONSULTAN
CV. ANUGRAH PUTRA
970,000,000
98.1
0
PT. MISKAT ALAM KONSULTAN
Ombolata Salo'o, Sifalaete Ulu, Sinarikhi Kec. Gunungsitoli Kabupaten Nias 99 Desa Lasara Siwalubanua, Kecamatan Mau Kabupaten
BANTUAN PEMBANGUNAN RUMAH TIPE C
PSD Pemukiman Nias 1 Pembangunan Parit Beton Perumnas Dahana Indah
K
F
G.Sitoli
6,705,000,000
10,308,097,000
1,800,988,513 K
Type C - D
CV.Sahabat Sukses Mandiri
135,300,000
100
100
13,530,000
100.00
100
135,850,000
100
100
13,585,000
100.00
100
212,300,000
100
100
1,615,000
100.00
100
229,900,000
100
100
Dibayar dng DIPA L 100%
100.00
100
343,750,000
100
100
343,750,000
100.00
100
291,060,000
100
100
175,645,979
70.50
90
378,015,000
100
100
74,015,337
100.00
100
819,500,000
100
100
475,310,000
58.00
58
238,260,000
100
100
204,903,600
86.00
86
1/KTR/PSD/BRR.N/PPP/2006 14 Maret 2006
2 Pembangunan Parit Beton Perumnas Dahana Indah
K
F
G.Sitoli
1
Unit
K
Type C - A
CV.Yasen 2/KTR/PSD/BRR.N/PPP/2006 14 Maret 2006
3 Pembangunan Parit Beton Perumnas Dahana Indah
K
F
G.Sitoli
1
Unit
K
Type A
CV.Sogunania 3/KTR/PSD/BRR.N/PPP/2006 14 Maret 2006
4 Pekerjaan Pembangunaan Jalan Lingkungan di Perumah K
F
G.Sitoli
1
Unit
K
Dahana Indah
UD.Sinar Kasih 5/KTR/PSD/BRR.N/PPP/2006 14 Maret 2006
5 Pembangunan Parit Beton & Jln Lingk di Ds.Tumori
K
F
G.Sitoli
1
Unit
K
CV.Setiawan 4/KTR/PSD/BRR.N/PPP/2006 22-Apr-06
6 Pekerjaan Pembangunaan Jalan Lingkungan di Perumah K
F
Lahewa
1
Unit
K
Sihene'asi Kec.Lahewa
CV.Rani Gana 7/KTR/PSD/BRR.N/PPP/2006 14 Maret 2006
7 Pembangunan Parit Beton Perumnas Dahana Indah
K
F
G.Sitoli
1
Unit
K
CV.Idapola 8/KTR/PSD/BRR.N/PPP/2006 14 Maret 2006
8 Pekerjaan Prasarana Dasar Pemukiman di desa Dahana
K
F
G.Sitoli
1
Unit
K
CV.Moroo 9/KTR/PSD/BRR.N/PPP/2006 14 Maret 2006
9 Pembangunan Jalan Setapak dan Parit Beton ( Blok B,K L,N ) di Kel.Ilir
K
F
G.Sitoli
1
Unit
K
CV.Taruna Permai Jaya 12/KTR/PSD/BRR.N/PPP/2006 14 Maret 2006
No
PROYEK / BAGIAN PROYEK PAKET
1
KEGIATAN
2
10 Pembangunan Jalan Setapak dan Parit Beton ( Blok A,C
NAMA PERUSAHAAN
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
3
4
5
6
7
8
9
10
K
F
G.Sitoli
1
Unit
K
CV.Felix
D,E,F ) di Kel.Ilir
NOMOR/TGL KONTRAK
Nilai Kontrak Awal 11
Nilai Kontrak
Rencana (%)
ADDENDUM I
Keu
Fisik
Realisasi Keuangan ( RP )
%
(%)
12
13
14
15
16
Fisik
17
152,900,000
100
100
43,871,597
100.00
100
110,110,000
100
100
Dibayar dng DIPA L 90 %
90.00
100
48,312,000
100
100
48,312,000
100.00
100
9,350,000
100
100
-
100
232,650,000
100
100
232,650,000
100.00
100
99,000,000
100
100 ibayar dng DIPA L 92,773 %
92.77
100
173,800,000
100
100
100.00
100
14/KTR/PSD/BRR.N/PPP/2006 14 Maret 2006
11 Pembangunan Jalan Setapak dan Parit Beton ( Blok G,H
K
F
G.Sitoli
1
Unit
K
I,J,M ) di Kel.Ilir
CV.Rota 13/KTR/PSD/BRR.N/PPP/2006 14 Maret 2006
12 Pembangunan Tempat Pembuangan Sampah di Perum
K
F
G.Sitoli
1
Unit
K
I,J,M ) di Kel.Ilir
CV.Yasen 15/KTR/PSD/BRR.N/PPP/2006 14 Maret 2006
13 Pembangunan Gapura di Perumnas Dahana Indah
K
F
G.Sitoli
1
Unit
K
CV.Sogunania 21/KTR/PSD/BRR.N/PPP/2006 14 Maret 2006
14 Pembangunan Jalan Setapak dan Parit Beton dikawasa
K
F
G.Sitoli
1
Unit
K
rumah pengungsi sementara di Kel.Saombo
UD.Makmur 17/KTR/PSD/BRR.N/PPP/2006 22-Apr-06
15 Pek.Pembangunan/Perbaikan Saluran Pembuangan
K
F
G.Sitoli
1
Unit
K
sepanjang 114,5 M di Kel.Ilir
CV.Mestika Abadi 18/KTR/PSD/BRR.N/PPP/2006 14 Maret 2006
16 Pembangunan Jalan Setapak dan Parit Beton didesa
K
F
G.Sitoli
1
Unit
K
Humene Kec.G.Sitoli
CV.Idapola
173,800,000
22/KTR/PSD/BRR.N/PPP/2006 14 Maret 2006
Rehabilitasi Rumah
1,136
UNIT
15,904,000,000
Pembangunan Rumah Baru Nias Selatan
2530
UNIT
126,500,000,000
Tahun Anggaran 2006
2488
Unit
350,000,000
10,201,000,000
125,574,700,000
64.14
44,648,088,820
35.56
- Pembangunan Rumah Baru ( ABT ) NiSel 1 Kel Teluk Dalam
K
F
T.Dalam
7
K
K
F
T.Dalam
15
Unit
750,000,000
F
T.Dalam
5
Unit
250,000,000
F
T.Dalam
8
Unit
400,000,000
F
olomatua
10
Unit
500,000,000
F
T.Dalam
8
Unit
400,000,000
F
T.Dalam
8
Unit
400,000,000
F
T.Dalam
12
Unit
600,000,000
100
CV.Niska
222,000,000
100
100
222,000,000
100
100
CV.Niha Raya
369,600,000
100
100
295,680,000
80
87.565
CV.Marao
466,500,000
100
100
353,934,949
75.87
100
CV.Catur Putra Agung Perkasa
355,200,000
100
100
355,200,000
100
100
CV.Nurlim
355,200,000
100
100
355,200,000
100
100
554,400,000
100
100
554,400,000
100
100
09.T/KTR/BRR.N/PPP/2006
K
89.56
14 Maret 2006 K
8 Botohilitano
620,661,888
08.T/KTR/BRR.N/PPP/2006
K
100
14 Maret 2006 K
7 Kel.Pasar
100
14.T/KTR/BRR.N/PPP/2006
K
693,000,000
14 Maret 2006 K
6 Kel.Pasar
CV.Tri Bina Sakti
12.T/KTR/BRR.N/PPP/2006
K
100
14 Maret 2006 K
5 Hilisangawola
100.0
10.T/KTR/BRR.N/PPP/2006
K
376,536,065
14 Maret 2006 K
4 Hiliganowo
100
06.T/KTR/BRR.N/PPP/2006
K
100
14 Maret 2006 K
3 Kel.Pasar
310,800,000
15.T/KTR/BRR.N/PPP/2006
2 Hilimaenamolo
CV.Mitra Utama
14 Maret 2006 K
CV.Putra Sorake
Ket./KONSULTAN SUPERVISI
No
PROYEK / BAGIAN PROYEK PAKET
1
KEGIATAN
2
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
3
4
5
6
7
8
9 -
K
F
T.Dalam
5
Unit
250,000,000
F
T.Dalam
10
Unit
500,000,000
F
T.Dalam
10
Unit
500,000,000
Fisik
Realisasi Keuangan ( RP )
%
(%)
12
13
14
15
16
Fisik
Ket./KONSULTAN SUPERVISI 17
CV.Kasih
222,000,000
100
100
222,000,000
100
100
CV.Guelna
462,000,000
100
100
462,000,000
100
100
462,000,000
100
100
462,000,000
100
100
91.749
2,788,972,200
17.T/KTR/BRR.N/PPP/2006
K
Keu
14 Maret 2006 K
11 Hiliganawa
Rencana (%)
ADDENDUM I
11.T/KTR/BRR.N/PPP/2006
K
11
Nilai Kontrak
14 Maret 2006 K
10 Bawonohono ( 5 ), Bawomataluo ( 5 )
10
Nilai Kontrak Awal
15.T/KTR/BRR.N/PPP/2006
9 Kel.Teluk Dalam
NAMA PERUSAHAAN NOMOR/TGL KONTRAK
14 Maret 2006 K
UD.Sagala
-
13.T/KTR/BRR.N/PPP/2006
-
14 Maret 2006
KUALIFIKASI BESAR DAN MENENGAH 1
Gomo A kec. Gomo (225 rumah)
K
F
NiSel
225
Unit
Paket (01.02.02.001)
11,250,000,000
K
K
F
NiSel
229
Unit
Paket (01.02.08.004)
11,450,000,000 -
K
F
NiSel
225
Unit
Paket (01.02.02.001)
11,250,000,000
F
NiSel
60
Unit
Paket (01.02.01.005)
3,000,000,000
F
NiSel
120
Unit
(120 rumah) Paket (01.02.04.007)
6,000,000,000
F
NiSel
32
Unit
Paket (01.02.02.001)
1,600,000,000
F
NiSel
84
Unit
Ulunoyo (84 rumah) Paket (01.02.05.007)
4,200,000,000
F
NiSel
32
Unit
Paket (01.02.06.004)
1,600,000,000
F
NiSel
81
Unit
Hilifadolo, Hilifadolo, Amuri, dan sekitarnya F
NiSel
32
Unit
Paket (01.02.07.001)
1,600,000,000
F
NiSel
81
Unit
Paket (01.02.08.001)
4,050,000,000
F
NiSel
45
Unit
(45 rumah) Paket (01.02.08.008)
2,250,000,000
F
NiSel
60
Unit
Hilisataro , Bawodobara, Saua, Hilinifaoso F
NiSel
61
Unit
Paket (01.02.02.001)
3,050,000,000
F
NiSel
70
Unit
3,500,000,000
PT. KARYA UTAMA SAKTI
6,060,000,000
100
2,196,434,880
36.24
27.825
PT. PEMETAR ARGEO (MC I, II, III) Juli, Agustus, September 06
CV. NIAS BARU
1,672,000,000
100
334,400,000
20.00
0
PT. PEMETAR ARGEO
PT. ANDALINDO AGROTEK NIAGA
4,410,000,000
99.298
882,000,000
20.00
0.367
PT. PEMETAR ARGEO
PT. SIGANTANG FADLI SEJATI
1,680,000,000
100
336,000,000
20.00
7.641
PT. PEMETAR ARGEO
PT. JAYA MITRA KONSTRUKSI
4,252,500,000
100
850,500,000
20.00
38.432
PT. PEMETAR ARGEO
CV. GERAK PEMBANGUNAN
1,648,000,000
100
329,600,000
20.00
87.823
PT. LYDUMA INTERMAS
PT. DUTA SELATAN CEMERLANG
3,989,250,000
97.997
797,850,000
20.00
50.4
PT. LYDUMA INTERMAS
PT. TORPANA
2,137,500,000
100
427,500,000
20.00
18.042
PT. LYDUMA INTERMAS
CV. PERINTIS
3,150,000,000
100
630,000,000
20.00
11.875
PT. LYDUMA INTERMAS
2,928,000,000
100
1,641,436,800
56.06
59.846
23 JUNI 2006 K
K
PT. PEMETAR ARGEO (MC I, II, III) Juli, Agustus, September 06
36/P2P/BRR/APBN/2006 PT. ANDALAS I JAYA UTAMA 26/P2P/BRR/APBN/2006
15 Hiliamaetaniha, Bawoganowo, Lawindra, Hilifalago
47.872
23 JUNI 2006 K
K
40.33
41/P2P/BRR/APBN/2006
-
kec. Teluk Dalam (60 rumah) Paket (01.02.08.012) 14 Hiliamaeta kec. Teluk Dalam (61 rumah)
3,000,000,000
1,222,132,320
23 JUNI 2006 K
K
98.883
40/P2P/BRR/APBN/2006
13 Hilizalootano, Bawolahusa, hilinawalo, Mazingo,
3,030,000,000
23 JUNI 2006 K
K
PT. NIASINDO DUTA CEMERLANG
34/P2P/BRR/APBN/2006
12 Bawolowalani, Hilianaa, Hiligeho kec. Teluk Dalam
PT. LYDUMA INTERMAS (MC I, II, III) Juli, Agustus, September 06
23 JUNI 2006 K
K
35
25/P2P/BRR/APBN/2006
11 Hilisimaetano kec. Teluk Dalam (81 rumah)
60.83
23 JUNI 2006 K
K
6,740,644,590
33/P2P/BRR/APBN/2006
-
(81 rumah) Paket (01.02.06.005) 10 Tello A kec. Tello (32 rumah)
4,050,000,000
100
23 JUNI 2006 K
K
11,081,250,000
37/P2P/BRR/APBN/2006
9 Tuhegafoa, Sisarahili Ekholo, Lolohowa, Tuhoowo
PT. BINTAN ATMA MANDRA SAKTI
23 JUNI 2006 K
K
PT. LYDUMA INTERMAS (MC I, II, III) Juli, Agustus, September 06
13/P2P/BRR/APBN/2006
8 Lolohowa, Tuhoowo, Hilifadolo
21.8
23 JUNI 2006 K
K
32.08
32/P2P/BRR/APBN/2006
7 Lawa-Lawa Luo, Hilisangowola, Marao dan Orahili
3,618,333,278
23 JUNI 2006 K
K
100
10/P2P/BRR/APBN/2006
6 Hiliotalua, Koendrafo kec. Lolomatua (32 rumah)
11,278,250,000
19 JUNI 2006 K
K
PT. PERKASARAYA LAOWOMARU
02/P2P/BRR/APBN/2006
5 Bawozihono, Hilisimaetano sekitarnya kec. Lahusa
PT. PEMETAR ARGEO (MC I, II, III) Juli, Agustus, September 06
19 JUNI 2006 K
K
21.604
03/P2P/BRR/APBN/2006
4 Amandraya kec. Amandraya (60 rumah)
24.07
19 JUNI 2006 K
3 Kelurahan Hiliganowo kec. Teluk Dalam (225 rumah)
11,587,500,000
01/P2P/BRR/APBN/2006
2 Teluk Dalam kec. Teluk Dalam (229 rumah)
PT. LIMBANGAN ALAMINDO PERKASA
PT. LYDUMA INTERMAS (MC I, II, III) Juli, Agustus, September 06
23 JUNI 2006 K
CV. USAHA RAYA
3,517,500,000
100
1,147,999,440
32.64
50.363
PT. LYDUMA INTERMAS
No
PROYEK / BAGIAN PROYEK PAKET
1
KEGIATAN
2
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
3
4
5
6
7
8
9
Hilinamozaua (70 rumah) Paket (01.02.08.014)
K
F
NiSel
90
Unit
Ono Hondro (90 Rumah) Paket (01.02.05.015)
4,500,000,000
10
Nilai Kontrak Awal 11
Nilai Kontrak
Rencana (%)
ADDENDUM I
Keu
Fisik
Realisasi Keuangan ( RP )
%
(%)
12
13
14
15
16
Fisik
14/P2P/BRR/APBN/2006
16 Bawomataluo, Orahili Fau, Siwalawa, Hilinawalo Fau
NAMA PERUSAHAAN NOMOR/TGL KONTRAK
Ket./KONSULTAN SUPERVISI 17 (MC I, II, III) Juli, Agustus, September 06
23 JUNI 2006 K
CV. PANAMA
-
35/P2P/BRR/APBN/2006
-
23 JUNI 2006
4,545,000,000
99.429
1,504,831,320
33.11
29.627
PT. LYDUMA INTERMAS (MC I, II, III) Juli, Agustus, September 06
KUALIFIKASI KECIL 17 Hilitatao A kec. Amandraya (16 Rumah)
K
F
NiSel
16
Unit
Paket (01.02.01.001)
800,000,000
K
-
18 Hilitotao Sekitarnya kec. Amandraya (Rumah)
K
F
NiSel
18
Unit
Paket (01.02.01.001)
900,000,000 -
K
F
NiSel
15
Unit
Paket (01.02.02.003) 20 Hibala kec. Hibala (11 Rumah)
K
F
NiSel
11
Unit
Paket (01.02.03.001)
750,000,000
F
NiSel
18
Unit
Paket (01.02.04.001) 22 Hilidohona kec. Lahusa (18 Rumah)
K
F
NiSel
18
Unit
Paket (01.02.04.002)
-
1 JULI 2006 K
F
NiSel
15
Unit
Paket (01.02.04.003) 24 Sisarahili Huruna Kec. Lolomatua (18 Rumah)
K
F
NiSel
18
Unit
Paket (01.02.05.005) 25 Hiliwaebu kec. Lolomatua (10 Rumah)
K
F
NiSel
10
Unit
Paket (01.02.05.009)
-
1 JULI 2006 K
F
NiSel
16
Unit
Paket (01.02.06.006) 27 Botohilitano kec. Teluk Dalam (7 Rumah)
K
F
NiSel
7
Unit
Paket (01.02.08.002)
-
1 JULI 2006 K
96-NS/P2P/BRR/APBN/2006
-
1 JULI 2006 K
800,000,000
F
NiSel
18
Unit
Paket (01.02.08.009)
-
1 JULI 2006 K
F
NiSel
10
Unit
Paket (01.02.08.010) 30 Hilisondrekha kec. Teluk Dalam (17 Rumah)
K
F
NiSel
17
Unit
Paket (01.02.08.011) 31 Hilizihono, Bawamataluo, Orahili kec. Teluk Dalam (12 Ru
K
F
NiSel
12
Unit
Paket (01.02.08.015)
500,000,000
Paket (01.02.08.016)
F
NiSel
12
Unit
787,500,000
100
539,437,500
68.50
82.535
PT. PEMETAR ARGEO Termin I
577,500,000
100
173,250,000
30.00
68.427
PT. LYDUMA INTERMAS
918,000,000
100
436,050,000
47.50
66.94
PT. PEMETAR ARGEO Termin I
927,000,000
98.664
278,100,000
30.00
53.463
PT. PEMETAR ARGEO
780,000,000
100
370,500,000
47.50
42.55
PT. PEMETAR ARGEO (Termin I)
945,000,000
100
448,875,000
47.50
66.554
PT. PEMETAR ARGEO (Termin I)
525,000,000
100
157,500,000
30.00
56.069
PT. PEMETAR ARGEO
816,000,000
100
558,960,000
68.50
97.397
PT. PEMETAR ARGEO (Termin I)
343,000,000
100
102,900,000
30.00
99.009
PT. LYDUMA INTERMAS
855,000,000
100
256,500,000
30.00
46.179
PT. LYDUMA INTERMAS
495,000,000
100
235,125,000
47.50
46.055
PT. LYDUMA INTERMAS
01 JULI 2006 K
CV. LUAHA GUNDE
-
01 JULI 2006 K
CV. HALIM
-
102-NS/P2P/BRR/APBN/2006
-
01 JULI 2006
600,000,000
PT. PEMETAR ARGEO
100-NS/P2P/BRR/APBN/2006
K
K
CV. ROROWA'AURI
101-NS/P2P/BRR/APBN/2006
600,000,000
44.179
01 JULI 2006 K
CV.YANI
Termin I 875,500,000
100
415,862,500
47.50
49.656
PT. LYDUMA INTERMAS (Termin I)
591,000,000
100
177,300,000
30.00
85.491
PT. LYDUMA INTERMAS
591,000,000
100
177,300,000
30.00
88.561
PT. LYDUMA INTERMAS
60-NS/P2P/BRR/APBN/2006
32 Hilinifaoso dan Sekitarnya kec. Teluk Dalam (12 Rumah)
CV. ARDIAN
850,000,000
30.00
56-NS/P2P/BRR/APBN/2006
K
CV. MISI DARMA UTAMA 98-NS/P2P/BRR/APBN/2006
900,000,000
283,500,000
1 JULI 2006 K
29 Hilitobara kec. Teluk Dalam (10 Rumah)
CV. MARAO
350,000,000
100
54-NS/P2P/BRR/APBN/2006
K
CV. FAMILI'S
-
28 Bawolowalani kec. Teluk Dalam (18 Rumah)
CV. DYAH 95-NS/P2P/BRR/APBN/2006
500,000,000
945,000,000
1 JULI 2006 K
K
CV. KHALIS
900,000,000
PT. PEMETAR ARGEO
113-NS/P2P/BRR/APBN/2006
26 Lolowau A kec. Lolowau (16 Rumah)
CV. MARCO 111-NS/P2P/BRR/APBN/2006
750,000,000
22.282
1 JULI 2006 K
K
CV. JOSUA KALEB
900,000,000
30.00
92-NS/P2P/BRR/APBN/2006
23 Lahusa kec. Lahusa (15 Rumah)
CV. SETIA KARYA 48-NS/P2P/BRR/APBN/2006
900,000,000
252,000,000
1 JULI 2006 K
K
100
90-NS/P2P/BRR/APBN/2006
21 Bawootalua kec. Lahusa (18 Rumah)
CV. FANAYAMA
550,000,000
840,000,000
1 JULI 2006 K
19 Gomo C kec. Gomo (15 Rumah)
CV. ANDA BANGUN NIAS 46-NS/P2P/BRR/APBN/2006
01 JULI 2006 K
CV. RAI
-
62-NS/P2P/BRR/APBN/2006
-
03 JULI 2006
No
PROYEK / BAGIAN PROYEK PAKET
1
KEGIATAN
2
33 Amandraya dan Sekitarnya kec. Amandraya (12 Rumah
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
3
4
5
6
7
8
9
10
K
F
NiSel
12
Unit
K
CV. BINA MAJU
Paket No. 01.02.01.006 34 Hilimaenamolo dan sekitarnya kec. Teluk Dalam (11 Rum
K
F
NiSel
11
Unit
Paket No. 01.02.08.017
600,000,000 -
106-NS/P2P/BRR/APBN/2006 03 JULI 2006
550,000,000
K
K
F
NiSel
10
Unit
Paket No. 01.02.08.018 36 Silimabanua, Sihare'e dan sekitarnya kec. Lahusa (12 Rum K
F
NiSel
12
Unit
Paket No. 01.02.04.008
500,000,000
F
NiSel
18
Unit
Paket No. 01.02.06.003 38 Tuhemberua Sekitarnya kec. Lolomatua (18 Rumah)
K
F
NiSel
18
Unit
Paket No. 01.02.05.001
108-NS/P2P/BRR/APBN/2006
-
03 JULI 2006 K
900,000,000
F
NiSel
13
Unit
Paket No. 01.02.01.004 40 Hilihoru Kec. Amandraya (18 Rumah)
K
F
NiSel
18
Unit
Paket No. 01.02.01.002 41 Lolozaria, Hilimbowo Kec. Amandraya (16 Rumah)
K
F
NiSel
16
Unit
Paket No. 01.02.01.003 42 Hiliamaetaniha Kec. TelukDalam (12 Rumah)
K
F
NiSel
12
Unit
Paket No. 01.02.08.031
-
03 JULI 2006 K
F
NiSel
15
Unit
Paket No. 01.02.04.005
-
03 JULI 2006 K
147-NS/P2P/BRR/APBN/2006
-
24 JULI 2006 K
F
NiSel
18
Unit
Paket No. 01.02.04.006
126-NS/P2P/BRR/APBN/2006
-
24 JULI 2006
600,000,000
K
750,000,000
900,000,000
F
NiSel
15
Unit
Paket No. 01.02.04.010 46 Bawolato Tetezou Kec. Lahusa (18 Rumah)
K
F
NiSel
18
Unit
Paket No. 01.02.04.011
750,000,000
F
NiSel
12
Unit
Paket No. 01.02.04.008
Paket No. 01.02.04.013
F
NiSel
18
Unit
CV. VONDRAHI
CV. MITRA UTAMA
-
25 JULI 2006
900,000,000 -
15
16
47.50
65.052
287,850,000
Ket./KONSULTAN SUPERVISI 17 PT. PEMETAR ARGEO (Termin I)
536,250,000
100
160,875,000
30.00
87.176
PT. LYDUMA INTERMAS
492,500,000
100
337,362,500
68.50
91.513
PT. LYDUMA INTERMAS Termin I
612,000,000
100
183,600,000
30.00
94.197
PT. PEMETAR ARGEO
927,000,000
100
440,325,000
47.50
69.172
PT. PEMETAR ARGEO (Termin I)
945,000,000
100
283,500,000
30.00
55.989
PT. PEMETAR ARGEO
666,250,000
100
316,468,750
47.50
72.252
PT. PEMETAR ARGEO (Termin I)
936,000,000
99.798
234,000,000
25.00
63.735
PT. PEMETAR ARGEO (Termin I)
832,000,000
100
249,600,000
30.00
65.537
PT. PEMETAR ARGEO Uang Muka
624,000,000
99.375
187,200,000
30.00
68.955
PT. LYDUMA INTERMAS
772,500,000
99.273
231,750,000
30.00
53.798
PT. PEMETAR ARGEO
927,000,000
100
278,100,000
30.00
71.282
PT. PEMETAR ARGEO
765,000,000
99.452
363,375,000
47.50
68.141
PT. PEMETAR ARGEO
25 JULI 2006 K
K
CV. NIAS MEKAR
Termin I 918,000,000
100
612,000,000
100
927,000,000
100
275,400,000
30.00
62.874
PT. PEMETAR ARGEO
51.924
PT. PEMETAR ARGEO
41.452
PT. PEMETAR ARGEO
136-NS/P2P/BRR/APBN/2006 25 JULI 2006 K
K
14
117-NS/P2P/BRR/APBN/2006
CV. DALNI MEKAR 146-NS/P2P/BRR/APBN/2006
48 Hilidohona Kec. Lahusa (18 Rumah)
CV. SAHABAT BARU
122-NS/P2P/BRR/APBN/2006
600,000,000
13
25 JULI 2006 K
K
12
Fisik
134-NS/P2P/BRR/APBN/2006
47 Tetezou, Silimabanua Kec. Lahusa (12 Rumah)
CV. AMOILANIHA
900,000,000
(%)
26 JULI 2006 K
K
%
114-NS/P2P/BRR/APBN/2006
45 Bawalato Sekitarnya Kec. Lahusa (15 Rumah)
CV. SELATAN MANDIRI
-
K
CV. FAISAL
-
44 Golambanua I B Kec. Lahusa (18 Rumah)
CV. ONODA 112-NS/P2P/BRR/APBN/2006
800,000,000
( RP )
99.144
Realisasi Keuangan
03 JULI 2006 K
K
CV. TEMAN RAYA
900,000,000
Fisik
68-NS/P2P/BRR/APBN/2006
43 Golambanua IA Kec. Lahusa (15 Rumah)
CV. RITA 110-NS/P2P/BRR/APBN/2006
650,000,000
Keu
01 JULI 2006 K
K
CV. NURLIM
900,000,000
606,000,000
Rencana (%)
ADDENDUM I
66-NS/P2P/BRR/APBN/2006
39 Tuindrao sekitarnya kec. Lolomatua (18 Rumah)
CV. HILIAMAEGILA
600,000,000
11
Nilai Kontrak
01 JULI 2006 K
K
CV. INDAH JAYA
Nilai Kontrak Awal
64-NS/P2P/BRR/APBN/2006
37 Togizita kec. Lolowau (18 Rumah)
NOMOR/TGL KONTRAK
-
35 Hilisimaetano dan sekitarnya kec. Teluk Dalam (10 Ruma
NAMA PERUSAHAAN
K/S
25 JULI 2006 K
CV. SAHABAT SELATAN 118-NS/P2P/BRR/APBN/2006
278,100,000
30.00
No
PROYEK / BAGIAN PROYEK PAKET
1
KEGIATAN
2
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
3
4
5
6
7
8
9 -
49 Hilidohona, Ulu Idanodua dan Sekitarnya Kec. Lahusa (10
K
F
NiSel
10
Unit
Paket No. 01.02.04.007 50 Bawozihono dan Sekitarnya Kec. Lahusa (15 Rumah)
K
F
NiSel
15
Unit
Paket No. 01.02.04.012 51 Bawolato, Lahusa, Hilidohona Kec. Lahusa (10 Rumah)
K
F
NiSel
10
Unit
Paket No. 01.02.04.014
500,000,000
K
F
NiSel
18
Unit
Paket No. 01.02.02.002 53 Sifaoroasi Kec. Lolomatua (17 Rumah)
K
F
NiSel
17
Unit
Paket No. 01.02.05.004 54 Lalimanawa, Tesikhori Kec. Lolomatua (12 Rumah)
K
F
NiSel
12
Unit
Paket No. 01.02.05.006
122-NS/P2P/BRR/APBN/2006
-
25 JULI 2006
750,000,000
K
120-NS/P2P/BRR/APBN/2006
-
25 JULI 2006
500,000,000
K
900,000,000
F
NiSel
12
Unit
Paket No. 01.02.05.003 56 Tundumbaho Kec. Lolomatua (6 Rumah)
K
F
NiSel
6
Unit
Paket No. 01.02.05.008 57 Lolomoyo, Sisarahili Oyo, Soledua (18 Rumah)
K
F
NiSel
18
Unit
Paket No. 01.02.05.008 58 Simandraolo Sekitarnya Kec. Lolowau (17 Rumah)
K
F
NiSel
17
Unit
Paket No. 01.02.06.002
-
25 JULI 2006 K
F
NiSel
19
Unit
Paket No. 01.02.06.007 60 Sisarahili Oyo, Sole II, Lolomoyo Kec. Lolowau (16 Rumah)
K
F
NiSel
16
Unit
Paket No. 01.02.06.008
132-NS/P2P/BRR/APBN/2006
-
26 JULI 2006 K
600,000,000
F
NiSel
12
Unit
Paket No. 01.02.06.011
-
25 JULI 2006 K
143-NS/P2P/BRR/APBN/2006
-
25 JULI 2006 K
F
NiSel
10
Unit
Paket No. 01.02.06.011
148-NS/P2P/BRR/APBN/2006
-
25 JULI 2006
850,000,000
K
950,000,000
F
NiSel
10
Unit
Paket No. 01.02.08.032 64 Orahili Fau dan Sekitarnya Kec. Teluk Dalam (9 Rumah)
K
F
NiSel
9
Unit
Paket No. 01.02.08.029 65 Bawozaua, Hilinifaoso dan Sekitarnya Kec. Teluk Dalam (
K
F
NiSel
10
Unit
Paket No. 01.02.08.023
-
25 JULI 2006 K
500,000,000
500,000,000
F
NiSel
10
Unit
Paket No. 01.02.08.027 67 Hilindrasoniha dan Sekitarnya Kec. Teluk Dalam (12 Ruma
K
F
NiSel
12
Unit
CV. ARSENDA SENTOSA
CV. MOALE INDAH
14
15
16
Ket./KONSULTAN SUPERVISI 17
515,000,000
99.273
244,625,000
47.50
40.94
PT. PEMETAR ARGEO (Termin I)
765,000,000
100
363,375,000
47.50
59.62
PT. PEMETAR ARGEO (Termin I)
515,000,000
99.273
154,500,000
30.00
48.669
PT. PEMETAR ARGEO
936,000,000
99.798
280,800,000
30.00
10.719
PT. PEMETAR ARGEO Uang Muka
879,750,000
99.275
263,925,000
30.00
10.588
PT. PEMETAR ARGEO Uang Muka
618,000,000
99.309
185,400,000
30.00
3.648
PT. PEMETAR ARGEO
618,000,000
96.452
185,400,000
30.00
23.681
PT. PEMETAR ARGEO Uang Muka
309,000,000
96.171
92,700,000
30.00
55.554
PT. PEMETAR ARGEO Uang Muka
936,000,000
99.693
280,800,000
30.00
15.452
PT. PEMETAR ARGEO Uang Muka
884,000,000
98.584
265,200,000
30.00
61.517
PT. PEMETAR ARGEO
978,500,000
99.272
293,550,000
30.00
66.03
PT. PEMETAR ARGEO Uang Muka
832,000,000
99.375
249,600,000
624,000,000
99.677
520,000,000
98.542
156,000,000
490,000,000
99.876
335,650,000
30.00
65.646
PT. PEMETAR ARGEO
75.37
PT. PEMETAR ARGEO
30.00
49.77
PT. PEMETAR ARGEO
68.50
95.704
PT. LYDUMA INTERMAS
140-NS/P2P/BRR/APBN/2006 26 JULI 2006 K
CV. KURNIAWAN JAYA 26 JULI 2006
K
CV. LISA VICTORY
-
144-NS/P2P/BRR/APBN/2006
-
26 JULI 2006 K
CV. NISKA
Termin I 459,000,000
99.552
137,700,000
30.00
68.247
PT. LYDUMA INTERMAS (Uang Muka 30%)
495,000,000
97.426
148,500,000
30.00
41.247
PT. LYDUMA INTERMAS
495,000,000
99.025
148,500,000
30.00
48.551
PT. LYDUMA INTERMAS
139-NS/P2P/BRR/APBN/2006 26 JULI 2006 K
CV. WAHANA KARYA
-
142-NS/P2P/BRR/APBN/2006
-
26 JULI 2006
600,000,000
13
26 JULI 2006 K
-
500,000,000
12
Fisik
137-NS/P2P/BRR/APBN/2006
135-NS/P2P/BRR/APBN/2006
500,000,000
(%)
25 JULI 2006 K
K
CV. VEGATON
450,000,000
%
123-NS/P2P/BRR/APBN/2006
66 Hilisondrekha Kec. Teluk Dalam (10 Rumah)
CV. WIRA SIWALAWA 133-NS/P2P/BRR/APBN/2006
600,000,000
( RP )
25 JULI 2006 K
K
CV. FANAYAMA
800,000,000
Realisasi Keuangan
150-NS/P2P/BRR/APBN/2006
63 Hilisataro sekitarnya kec. Teluk Dalam (10 Rumah)
CV. KARYA PURA
-
K
CV. CHARISMA JAYA
-
62 Hilinamazihono Kec. Lolowau (10 Rumah)
CV. RAZASA AGUNG 148-NS/P2P/BRR/APBN/2006
900,000,000
Fisik
25 JULI 2006 K
K
CV. AVOREI
300,000,000
Keu
124-NS/P2P/BRR/APBN/2006
61 Hilimbowo dan Sekitarnya Kec. Lolowau (12 Rumah)
CV. TIUS
-
K
CV. WIRA 145-NS/P2P/BRR/APBN/2006
600,000,000
Rencana (%)
ADDENDUM I
25 JULI 2006 K
59 Lolowau B Kec. Lolowau (19 Rumah)
CV. KASIH
850,000,000
11
Nilai Kontrak
115-NS/P2P/BRR/APBN/2006
K
CV. NUSA PERMAI
-
55 Sifalago Kec. Lolomatua (12 Rumah)
CV. SAHABAT SETIA
-
K
10
Nilai Kontrak Awal
25 JULI 2006
52 Gomo B Kec. Gomo (18 Rumah)
NAMA PERUSAHAAN NOMOR/TGL KONTRAK
K
CV. BERKAT JAYA
Uang Muka 603,000,000
99.552
180,900,000
30.00
73.646
PT. LYDUMA INTERMAS
No
PROYEK / BAGIAN PROYEK PAKET
1
KEGIATAN
2
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
3
4
5
6
7
8
9
Paket No. 01.02.08.025
K
F
NiSel
6
Unit
Paket No. 01.02.08.003 69 Kelurahan Pasar Kec. Teluk Dalam (9 Rumah)
K
F
NiSel
9
Unit
Paket No. 01.02.08.005
300,000,000
125-NS/P2P/BRR/APBN/2006
-
26 JULI 2006 K
K
F
NiSel
10
Unit
Paket No. 01.02.08.024
500,000,000
F
NiSel
12
Unit
Paket No. 01.02.08.028
600,000,000
F
NiSel
10
Unit
Paket No. 01.02.02.002
500,000,000
Realisasi Keuangan ( RP )
%
(%)
12
13
14
15
16
47.50
62.585
Fisik
Ket./KONSULTAN SUPERVISI 17
UD. ALNOV
294,000,000
99.878
139,650,000
PT. LYDUMA INTERMAS Termin I
432,000,000
99.844
129,600,000
30.00
36.456
PT. LYDUMA INTERMAS
CV. NISCAHYANTI
490,000,000
99.878
147,000,000
30.00
93.966
PT. LYDUMA INTERMAS
612,000,000
99.343
183,600,000
77.192
PT. LYDUMA INTERMAS
520,000,000
99.376
156,000,000
30.00
4.162
PT. PEMETAR ARGEO
1,938,000,000
100
755,199,840
38.97
30.915
26 JULI 2006 K
K
Fisik
128-NS/P2P/BRR/APBN/2006 CV. GUELNA 130-NS/P2P/BRR/APBN/2006
72 Gomo D Kec. Gomo (10 Rumah)
Keu
26 JULI 2006 K
K
Rencana (%)
ADDENDUM I
116-NS/P2P/BRR/APBN/2006
71 Orahili dan Sekitarnya Kec. Teluk Dalam (12 Rumah)
CV. SICHA WIJAYA
450,000,000
11
Nilai Kontrak
26 JULI 2006 K
70 Bawonahono Kec. Teluk Dalam (10 Rumah)
10
Nilai Kontrak Awal
129-NS/P2P/BRR/APBN/2006
68 Lagundri Kec. Teluk Dalam (6 Rumah)
NAMA PERUSAHAAN NOMOR/TGL KONTRAK
26 JULI 2006 K
CV. MOALE
-
119-NS/P2P/BRR/APBN/2006
-
26 JULI 2006
KUALIFIKASI MENENGAH (TAMBAHAN) 73 Lahusa dan sekitarnya kec. Lahusa (38 Rumah)
K
F
NiSel
38
Unit
Paket No. 01.02.04.009
1,900,000,000
K
-
74 Hiliorudua dan sekitarnya kec. Amandraya (30 Rumah)
K
F
NiSel
30
Unit
Paket no. 01.02.01.006
1,500,000,000 -
K
F
NiSel
28
Unit
1,400,000,000
PT. PEMETAR ARGEO (MC I, II, III) Juli, Agustus, September 06
03 JULI 2006 K
PT. ARTI MANGGALYA
1,575,000,000
99.931
1,372,000,000
100
520,000,000
0
315,000,000
20.00
43.885
PT. PEMETAR ARGEO
78.143
PT. LYDUMA INTERMAS
140-NS/P2P/BRR/APBN/2006
75 Bawonahono dan Sekitarnya
PT. YUDHA KARYA 74/P2P/BRR/APBN/2006
01 JULI 2006 K
Paket No. 01.02.08.018
PT. SELATAN JAYA 120-NS/P2P/BRR/APBN/2006 01 JULI 2006
KUALIFIKASI KECIL (PERUBAHAN TGL 14 JULI 2006) 76 Hili'ofona Luo Kec. Teluk Dalam (10 Rumah)
K
F
NiSel
10
Unit
500,000,000
K
CV. OIKHODA
156,000,000
30.00
0
Paket No. 01.02.08.030
Uang Muka
PSD Pemukiman Nias Selatan 1 Pek.Pembuatan Jalan Masuk Kelokasi Perum Hiliana'a
1 K
F
PKT
8,694,403,000
NiSel
2,072,505,000 K
CV.Cakrawala Beton
197,515,078
512,600,000
100
100
Dibayar dng DIPA L 82.8%
82.80
100
574,750,000
100
100
101,422,500
100.00
100
802,340,000
100
100
78,717,578
100.00
100
165,440,000
100
100
17,375,000
100
100
10/KTR/PSD/BRR.N/PPP/2006 14 Maret 2006 2 Pembangunan Jalan Ruas Desa Botohilitano-Perum BRR
K
F
NiSel
Pembanguan Tembok Penahan dan Parit
942.5
M
67
M
903
M
1.011
M
K
CV.Luaha Gunde 19/KTR/PSD/BRR.N/PPP/2006 14 Maret 2006
3 Pembangunan Tembok Penahan Tanah
K
F
NiSel
Pembangunan Parit Pas.Batu
K
CV.Putra Sorake 20/KTR/PSD/BRR.N/PPP/2006 14 Maret 2006
4 Pematangan Tanah di Botohili
K
F
NiSel
K
CV.Cakrawala Beton
-
100
23/KTR/PSD/BRR.N/PPP/2006 6 Februari 2006 4 Pematangan Lahan Untuk Pembangunan Temporary She K
F
NiSel
1
PKT
PT. MITRA KARYA 01/PSD/P2P/BRR/APBN/2006 26 Juni 2006
Rehabilitasi Rumah
1,136
UNIT
15,904,000,000
17,375,000
100.00
100
No
PROYEK / BAGIAN PROYEK PAKET
1
KEGIATAN
2
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
3
4
5
6
7
8
9
130
UNIT
23
Unit
SISA LUNCURAN Pembangunan Rumah 2005
NAMA PERUSAHAAN NOMOR/TGL KONTRAK 10
Nilai Kontrak Awal
Nilai Kontrak
Rencana (%)
ADDENDUM I
Keu
Fisik
( RP )
%
(%)
12
13
14
15
16
11
6,500,000,000
Realisasi Keuangan
Fisik
Ket./KONSULTAN SUPERVISI 17
4,862,495,694
Dibayarkan dengan DIPA T.A. 2006 KABUPATEN NIAS 1 Desa Moawo, Tuhumbalo, G. Sitoli, Gido 23 rumah
K
F
Nias
K
CV Benediksen
862,500,000
877,718,000
100
100
-
100.00
100
PT CAIL INDONESIA
375,000,000
395,280,000
100
100
-
95.66
100
PT CAIL INDONESIA
900,000,000
942,288,000
100
100
-
95.73
100
PT CAIL INDONESIA
750,000,000
783,520,000
100
100
-
85.72
91.451
PT CAIL INDONESIA
750,000,000
750,000,000
100
100
239,962,500
96.78
100
PT CAIL INDONESIA
375,000,000
375,000,000
100
100
52,507,500
100.00
100
PT CAIL INDONESIA
1,500,000,000
1,500,000,000
100
100
341,508,000
50.05
50.05
PT CAIL INDONESIA
375,000,000
397,146,000
100
100
397,146,000
100.00
100
PT CAIL INDONESIA
562,500,000
592,700,000
100
100
70,894,613
91.00
100
PT CAIL INDONESIA
1,875,000,000
1,962,000,000
100
100
319,531,320
100.00
100
PT CAIL INDONESIA
1,050,000,000
1,105,412,000
100
100
80.11
100
SUDAH PHO
562,500,000
592,700,000
100
100
90.00
100
PT CAIL INDONESIA
375,000,000
393,380,000
100
100
-
60.72
100
PT CAIL INDONESIA
750,000,000
792,220,000
100
100
-
87.70
100
PT CAIL INDONESIA
637,500,000
668,202,000
100
100
-
71.92
100
PT CAIL INDONESIA
375,000,000
394,840,000
100
100
100.00
100
PT CAIL INDONESIA
750,000,000
750,000,000
100
100
95.53
100
PT CAIL INDONESIA
02/KTR/BRR.N/PPP/2005 26 Desember 2005 2 Desa Wango, Hilimbusi, Lolofitu Moi 10 rumah
K
F
Nias
10
Unit
K
CV Wahana Darma 04/KTR/BRR.N/PPP/2005 26 Desember 2005
3 Desa Dahana, Gunung Sitoli 24 rumah
K
F
Nias
24
Unit
K
CV Romi 05/KTR/BRR.N/PPP/2005 26 Desember 2005
4 Desa Hilimbuasi, Lolofitu Moi 20 rumah
K
F
Nias
20
Unit
K
CV Gading Asia Mas 09/KTR/BRR.N/PPP/2005 26 Desember 2005
5 Desa Tiga Serangkai, Fodoro, Sirombu 20 rumah
K
F
Nias
20
Unit
K
CV Node 10/KTR/BRR.N/PPP/2005 26 Desember 2005
6 Desa Hiligawoni, Alasa 10 rumah
K
F
Nias
10
Unit
K
CV Setiawan 12/KTR/BRR.N/PPP/2005 26 Desember 2005
7 Desa Siheneasi, Lahewa 40 rumah
K
F
Nias
40
Unit
K
CV Griya Citra Murni 13/KTR/BRR.N/PPP/2005 26 Desember 2005
8 Desa Luaha Fodoro, Afulu 10 rumah
K
F
Nias
10
Unit
K
CV Tujuh Serangkai 15/KTR/BRR.N/PPP/2006 6 Januari 2006
9 Desa Tuwuna, Tetehosi, Lasara, Baguwu, Fodoro,
K
F
Nias
15
Unit
K
Lakhene, Kec. Mandrehe 15 rumah
CV Gombu 16/KTR/BRR.N/PPP/2006 6 January 2006
10 Desa Hilina'a, Boyo, Kec Gng Sitoli 50 rumah
K
F
Nias
50
Unit
K
UD Imbun 42/KTR/BRR.N/PPP/2006 9 January 2006
11 Desa Maliwa'a, Loloana'a, Hiliana, Tofuo, Oladano,
K
F
Nias
28
Unit
K
Biouti, Ahedano, Tetehosi, Saiwahili, Tuhewaebu, Hililawae, Kec Idanagawo 28 rumah 12 Desa Hiliwaele, Lasarabahili, Hilifadolo, Siduahili,
CV Bernando
-
41/KTR/BRR.N/PPP/2006 9 January 2006 K
F
Nias
15
Unit
K
Tuhemberua, Iraonogambo, Kec Mandrehe 15 rumah
CV Moroo
80,903,538
33/KTR/BRR.N/PPP/2006 9 January 2006
13 Desa Hiliduruwa, Sanawuyu, Fino, Onozitoli Sawo
K
F
Nias
10
Unit
K
Kec Tuhemberua 10 rumah
CV Riwu 50/KTR/BRR.N/PPP/2006 9 January 2006
14 Desa Botolakha, Hilimbosi, Kec Tuhemberua 20 rumah
K
F
Nias
20
Unit
K
CV Bahagia 53/KTR/BRR.N/PPP/2006 9 January 2006
15 Desa Hiiweto, Kec Gido
11 rumah Hilisebua 6 rumah
K
F
Nias
17
Unit
K
UD. Karya Umbu 51/KTR/BRR.N/PPP/2006 9 January 2006
16 Desa Hilidundra, Lawira Satua, Kec Lotu 10 rumah
K
F
Nias
10
Unit
K
CV Avora
31,109,444
23/KTR/BRR.N/PPP/2006 9 January 2006 17 Desa Hilimbowo Kare, Loloana, Hilina'a, Kec Alasa 20 rumah
K
F
Nias
20
Unit
K
CV Vegaton 34/KTR/BRR.N/PPP/2006
-
No
PROYEK / BAGIAN PROYEK PAKET
1
KEGIATAN
2
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
3
4
5
6
7
8
9
NAMA PERUSAHAAN NOMOR/TGL KONTRAK 10
Nilai Kontrak Awal
Nilai Kontrak
Rencana (%)
ADDENDUM I
Keu
Fisik
( RP )
%
(%)
12
13
14
15
16
11
Realisasi Keuangan
Fisik
Ket./KONSULTAN SUPERVISI 17
9 January 2006 18 Desa Balefadorotuho, Kec Lahewa 10 rumah
K
F
Nias
10
Unit
K
CV Bina Harapan
375,000,000
392,450,000
100
100
337,500,000
352,386,000
100
100
1,125,000,000
1,158,100,000
100
100
375,000,000
384,163,000
100
100
300,000,000
314,560,000
100
100
225,000,000
225,000,000
100
825,000,000
870,963,000
562,500,000
195,054,000
100.00
100
PT CAIL INDONESIA
-
90.10
100
PT CAIL INDONESIA
-
99.32
100
PT CAIL INDONESIA
100.00
100
PT CAIL INDONESIA
-
81.66
100
PT CAIL INDONESIA
100
-
98.08
100
PT CAIL INDONESIA
100
100
-
87.70
100
PT CAIL INDONESIA
590,355,000
100
100
100.00
100
PT CAIL INDONESIA
375,000,000
375,000,000
100
100
-
90
PT CAIL INDONESIA
375,000,000
375,000,000
100
100
-
80.25
100
PT CAIL INDONESIA
375,000,000
375,000,000
100
100
-
64.85
100
PT CAIL INDONESIA
375,000,000
375,000,000
100
100
-
76.30
100
PT CAIL INDONESIA
375,000,000
375,000,000
100
100
-
81.51
100
PT CAIL INDONESIA
375,000,000
375,000,000
100
100
171,776,250
100.00
100
PT CAIL INDONESIA
375,000,000
392,900,000
100
100
110,704,250
100.00
100
PT CAIL INDONESIA
412,500,000
431,011,900
100
100
34,450,782
100.00
100
PT CAIL INDONESIA
375,000,000
388,400,000
100
100
-
60.17
100
PT CAIL INDONESIA
375,000,000
393,300,000
100
100
-
100.00
100
PT CAIL INDONESIA
300,000,000
313,744,800
100
100
-
75.01
100
PT CAIL INDONESIA
55/KTR/BRR.N/PPP/2006 9 January 2006 19 Desa Harefanaese, Kec Alasa 9 rumah
K
F
Nias
9
Unit
K
CV Linda Permai 35/KTR/BRR.N/PPP/2006 9 January 2006
20 Desa Silimabanua, Banua Gea, Gunung Sitoli
K
F
Nias
30
Unit
K
Kec Tuhemberua 30 rumah
CV Asean Utama 36/KTR/BRR.N/PPP/2006 9 January 2006
21 Desa Mudik, Hilir, Kec Gunung Sitoli
10 rumah
K
F
Nias
10
Unit
K
CV Poppy
271,663,000
43/KTR/BRR.N/PPP/2006 9 January 2006 22 Desa Silaete Tabaloho, Kec Gunung Sitoli 8 rumah
K
F
Nias
8
Unit
K
CV Sogunania 52/KTR/BRR.N/PPP/2006 9 January 2006
23 Desa Sifalaete Tabaloho, Kec Gng Sitoli
6 rumah
K
F
Nias
6
Unit
K
CV Murni Pembangunan 54/KTR/BRR.N/PPP/2006 9 January 2006
24 Desa Silimabanua, Banua Gea, Kec Tuhemberua
K
F
Nias
22
Unit
K
22 rumah
CV Kartika 20/KTR/BRR.N/PPP/2006 9 January 2006
25 Desa Hilimbawadesolo ( 12 ) Tuhegeo( 3 )
K
F
Nias
15
Unit
K
CV.Sinar Humene
195,669,438
57/KTR/BRR.N/PPP/2006 28January 2006 26 Desa Arahili(4 ), esiwa ( 1 )
K
F
Nias
10
Unit
K
CV.Citra M 58/KTR/BRR.N/PPP/2006 28January 2006
27 Desa Sirete
K
F
Nias
10
Unit
K
CV.Rata Jaya 65/KTR/BRR.N/PPP/2006 28-Jan-06
28 Desa Sisarahili Bawolato
K
F
Nias
10
Unit
K
CV.Welling 61/KTR/BRR.N/PPP/2006 28-Jan-06
29 Desa Sirete
K
F
Nias
10
Unit
K
CV.Tania Gemilang Pratama 66/KTR/BRR.N/PPP/2006 28January 2006
30 Desa Sisarahili Bawolato
K
F
Nias
10
Unit
K
UD.Makmur 60/KTR/BRR.N/PPP/2006 28January 2006
31 Desa Tumori
K
F
Nias
10
Unit
K
CV.Kasih Beta 69/KTR/BRR.N/PPP/2006 1 Februari 2006
32 Kel.Ilir
K
F
Nias
10
Unit
K
CV.Idapola 63/KTR/BRR.N/PPP/2006 28January 2006
33 Desa Gada ( 6 ) ,Orahili ( 5 )
K
F
Nias
11
Unit
K
UD.Mega Raya 64/KTR/BRR.N/PPP/2006 1 Februari 2006
34 Desa Sisobahili Tabaloho
K
F
Nias
10
Unit
K
CV.Relinosia Panca Putra 56/KTR/BRR.N/PPP/2006 28January 2006
35 Sifalaete Ulu, kec. Gunungsitoli
K
F
Nias
10
Unit
K
CV. Hafaomasi 68/KTR/BRR.N/PPP/2006 1 Februari 2006
36 Bawolato
K
F
Nias
8
Unit
K
CV.Taruna Permai Jaya
No
PROYEK / BAGIAN PROYEK PAKET
1
KEGIATAN
2
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
3
4
5
6
7
8
9
NAMA PERUSAHAAN NOMOR/TGL KONTRAK 10
Nilai Kontrak Awal
Nilai Kontrak
Rencana (%)
ADDENDUM I
Keu
Fisik
( RP )
%
(%)
12
13
14
15
16
11
Realisasi Keuangan
Fisik
Ket./KONSULTAN SUPERVISI 17
67/KTR/BRR.N/PPP/2006 1 Februari 2006 37 G.Sitoli
K
F
Nias
10
Unit
K
CV.Polaris Sakti Pratama
375,000,000
375,000,000
100
100
975,000,000
1,024,010,000
100
100
300,000,000
300,000,000
100
100
375,000,000
392,000,000
100
100
375,000,000
375,000,000
100
100
337,500,000
337,500,000
100
100
375,000,000
375,000,000
100
100
225,000,000
236,730,000
100
375,000,000
393,000,000
975,000,000
975,000,000
-
65.01
82.65
PT CAIL INDONESIA
222,781,325
100.00
100
PT CAIL INDONESIA
210,000,000
100.00
100
PT CAIL INDONESIA
81.65
100
PT CAIL INDONESIA
100.00
100
PT CAIL INDONESIA
100.00
100
37,500,000
100.00
100
PT CAIL INDONESIA
100
53,965,200
100.00
100
PT CAIL INDONESIA
100
100
55,155,000
100.00
100
PT. JEFFRINDO CONSULTANT
1,021,800,000
100
100
-
92.34
100
SUDAH PHO
975,000,000
100
100
-
30.00
0
70/KTR/BRR.N/PPP/2006 6 Februari 2006 38 G.Sitoli
K
F
Nias
26
Unit
K
CV.Dua Ribu 72/KTR/BRR.N/PPP/2006 6 Februari 2006
39 IdanoGawo
K
F
Nias
8
Unit
K
CV.Tiara Jaya Sakti 74/KTR/BRR.N/PPP/2006 6 Februari 2006
40 Gido
K
F
Nias
10
Unit
K
CV.Tarigan Sirulo
-
77/KTR/BRR.N/PPP/2006 6 Februari 2006 41 G.Sitoli
K
F
Nias
10
Unit
K
CV.Ampera
42,934,250
76/KTR/BRR.N/PPP/2006 6 Februari 2006 42 Dahana Tabaloho
K
F
Nias
9
Unit
K
CV. Rota
-
75/KTR/BRR.N/PPP/2006 1 Februari 2006 43 G.Sitoli
K
F
Nias
10
Unit
K
CV.Mutiara Jaya 78/KTR/BRR.N/PPP/2006 6 Februari 2006
44 G.Sitoli
K
F
Nias
6
Unit
K
CV.Karya Bogali 79/KTR/BRR.N/PPP/2006 6 Februari 2006
KABUPATEN NIAS SELATAN 1 Desa Sifaoroasi, Kec Amandraya 10 rumah
K
F
NiSel
10
Unit
K
CV Selatan Mandiri 03/KTR/BRR.N/PPP/2006 26 Desember 2005
2 Desa Lagundri Lokasi I, Kec Teluk Dalam 26 rumah
K
F
NiSel
26
Unit
K
CV Cakrawala Beton 06/KTR/BRR.N/PPP/2006 26 Desember 2005
3 Desa Lagundri Lokasi II, Kec Teluk Dalam 26 rumah
K
F
NiSel
26
Unit
K
CV Sahabat Baru 07/KTR/BRR.N/PPP/2006
PT. JEFFRINDO CONSULTANT UANG MUKA
26 Desember 2005 4 Desa Botohilitano, Kec Teluk Dalam 68 rumah
K
F
NiSel
68
Unit
K
PT Sifra Kasih
2,550,000,000
2,550,000,000
100
100
806,249,200
76.32
76.32
PT. JEFFRINDO CONSULTANT
750,000,000
786,000,000
100
100
120,691,446
100.00
100
PT. JEFFRINDO CONSULTANT
375,000,000
393,000,000
100
100
-
87.61
87.61
PT. JEFFRINDO CONSULTANT
375,000,000
393,000,000
100
100
-
89.00
100
PT. JEFFRINDO CONSULTANT
375,000,000
393,000,000
100
100
30,348,819
100.00
100
PT. JEFFRINDO CONSULTANT
975,000,000
1,021,800,000
100
100
80,966,878
100.00
100
PT. JEFFRINDO CONSULTANT
975,000,000
1,021,800,000
100
100
44.30
54.769
PT. JEFFRINDO CONSULTANT
08/KTR/BRR.N/PPP/2006 26 Desember 2005 5 Desa Tuindrao, Lolomoyo, Kec Amandraya 10 rumah
K
F
NiSel
20
Unit
K
CV Kasih 11/KTR/BR.N/PPP/2006 26 Desember 2005
6 Desa Tuindrao, Kec Amandraya 10 rumah
K
F
NiSel
10
Unit
K
CV Karya Ewohu 14/KTR/BRR.N/PPP/2006 6 January 2006
7 Desa lagundri Lokasi III, Kec Teluk Dalam 10 rumah
K
F
NiSel
10
Unit
K
CV Prima Jaya 17/KTR/BRR.N/PPP/2006 6 January 2006
8 Desa Hilimbowo, Kec Lolowau 10 rumah
K
F
NiSel
10
Unit
K
CV Mitra Utama 18/KTR/BRR.N/PPP/2006 6 January 2006
9 Desa Hilimbowo,Hilimbulawa, Kec Amandraya 26 rumah
K
F
NiSel
26
Unit
K
CV Sinar Fohili 19/KTR/BRR.N/PPP/2006 9 January 2006
10 Desa Siwalawa, Kec Teluk Dalam 26 rumah
K
F
NiSel
26
Unit
K
CV Nias Indah
-
No 1
PROYEK / BAGIAN PROYEK PAKET
KEGIATAN
2
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
3
4
5
6
7
8
9
NAMA PERUSAHAAN NOMOR/TGL KONTRAK 10
Nilai Kontrak Awal
Nilai Kontrak
Rencana (%)
ADDENDUM I
Keu
Fisik
( RP )
%
(%)
12
13
14
15
16
11
Realisasi Keuangan
Fisik
Ket./KONSULTAN SUPERVISI 17
24/KTR/BRR.N/PPP/2006 9 January 2006 11 Desa Simandraolo, Kec Lolowau 10 rumah
K
F
NiSel
10
Unit
K
CV Putra Selatan
375,000,000
393,000,000
100
100
375,000,000
393,000,000
100
100
300,000,000
314,400,000
100
300,000,000
314,000,000
375,000,000
61,630,440
100.00
100
PT. JEFFRINDO CONSULTANT
-
90.24
100
PT. JEFFRINDO CONSULTANT
100
-
76.08
90
PT. JEFFRINDO CONSULTANT
100
100
-
60.71
60.79
PT. JEFFRINDO CONSULTANT
394,236,000
100
100
32,249,664
100.00
100
PT. JEFFRINDO CONSULTANT
375,000,000
393,000,000
100
100
21,980,277
100.00
100
PT. JEFFRINDO CONSULTANT
225,000,000
235,800,000
100
100
26,904,375
100.00
100
PT. JEFFRINDO CONSULTANT
337,500,000
353,700,000
100
100
25,112,862
100.00
100
PT. JEFFRINDO CONSULTANT
187,500,000
196,500,000
100
100
75.168
100
MASIH DLM PROSES PHO
412,500,000
432,300,000
100
100
35,399,150
100.00
100
PT. JEFFRINDO CONSULTANT
225,000,000
235,800,000
100
100
16,837,643
100.00
100
PT. JEFFRINDO CONSULTANT
375,000,000
393,000,000
100
100
78.06
100
SUDAH PHO
375,000,000
375,000,000
100
100
100.00
100
PT. JEFFRINDO CONSULTANT
375,000,000
395,000,000
100
100
-
72.57
90
PT. JEFFRINDO CONSULTANT
262,500,000
275,100,000
100
100
-
90.17
100
PT. JEFFRINDO CONSULTANT
21/KTR/BRR.N/PPP/2006 9 January 2006 12 Desa Siwalawa, Kec teluk Dalam 10 rumah
K
F
NiSel
10
Unit
K
CV Tahofi 30/KTR/BRR.N/PPP/2006 9 January 2006
13 Desa Tuhemberua, Kec Lolomatua 8 rumah
K
F
NiSel
8
Unit
K
CV Surya Indra 48/KTR/BRR.N/PPP/2006 9 January 2006
14 Desa Tuhemberua, Kec Lolomatua 8 rumah
K
F
NiSel
8
Unit
K
CV Puvo 49/KTR/BRR.N/PPP/2006 9 January 2006
15 Desa Lolowau, Kec Lolowau 10 rumah
K
F
NiSel
10
Unit
K
CV Fanayama 32/KTR/BRR.N/PPP/2006 9 January 2006
16 Desa Hilinamazihono, Kec Lolowau 10 rumah
K
F
NiSel
10
Unit
K
CV Moale Indah 28/KTR/BRR.N/PPP/2006 9 January 2006
17 Desa Hilisangowola, Kec Lolomatua 6 rumah
K
F
NiSel
6
Unit
K
CV Guelna 29/KTR/BRR.N/PPP/2006 9 January 2006
18 Desa Hilifalawu, Kec Amandraya 9 rumah
K
F
NiSel
9
Unit
K
CV Andre 40/KTR/BRR.N/PPP/2006 9 January 2006
19 Desa Sisarahili Ekholo, Kec Lolowau 5 rumah
K
F
NiSel
5
Unit
K
CV Win Jaya
-
39/KTR/BRR.N/PPP/2006 9 January 2006 20 Desa Hilifadolo, Kec Lolowau 11 rumah
K
F
NiSel
11
Unit
K
CV Remaja Maju 46/KTR/BRR.N/PPP/2006 9 January 2006
21 Desa Sifaoroasi, Kec Amandraya 6 rumah
K
F
NiSel
6
Unit
K
CV Tiga Serangkai 38/KTR/BRR.N/PPP/2006 9 January 2006
22 Desa Lalimanawa, Kec Lolomatua 10 rumah
K
F
NiSel
10
Unit
K
CV Sahabat Setia
-
44/KTR/BRR.N/PPP/2006 9 January 2006 23 Desa Olayama, Kec Lolowau 10 rumah
K
F
NiSel
10
Unit
K
CV Sahabat Selatan
96,761,175
45/KTR/BRR.N/PPP/2006 9 January 2006 24 Desa Tuhemberua, Kec Lolomatua 10 rumah
K
F
NiSel
10
Unit
K
CV Samuray Zato 31/KTR/BRR.N/PPP/2006 9 January 2006
25 Desa Sisobambowo, Kec Amandraya 7 rumah
K
F
NiSel
7
Unit
K
Koperasi Pasar Banuada 37/KTR/BRR.N/PPP/2006 9 January 2006
No
PROYEK / BAGIAN PROYEK PAKET
1
KEGIATAN
2
26 Desa Botohilitano, Kec Teluk Dalam 6 rumah
NAMA PERUSAHAAN
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
3
4
5
6
7
8
9
10
K
F
NiSel
6
Unit
K
CV Putra Sorake
NOMOR/TGL KONTRAK
Nilai Kontrak Awal
Nilai Kontrak
Rencana (%)
ADDENDUM I
Keu
Fisik
( RP )
%
(%)
12
13
14
15
16
11
Realisasi Keuangan
Fisik
Ket./KONSULTAN SUPERVISI 17
225,000,000
235,800,000
100
100
24,660,000
100.00
100
PT. JEFFRINDO CONSULTANT
225,000,000
235,800,000
100
100
26,001,900
100.00
100
PT. JEFFRINDO CONSULTANT
225,000,000
235,800,000
100
100
15,218,405
100.00
100
PT. JEFFRINDO CONSULTANT
375,000,000
393,000,000
100
100
32,140,000
100.00
100
PT. JEFFRINDO CONSULTANT
562,500,000
589,500,000
100
100
48,127,050
100.00
100
PT. JEFFRINDO CONSULTANT
225,000,000
235,800,000
100
100
100.00
100
PT. JEFFRINDO CONSULTANT
300,000,000
316,000,000
100
100
100.00
100
PT. JEFFRINDO CONSULTANT
937,500,000
982,500,000
100
100
-
28.137
PT. JEFFRINDO CONSULTANT
225,000,000
225,000,000
100
100
-
32.693
PT. JEFFRINDO CONSULTANT
25/KTR/BRR.N/PPP/2006 9 January 2006 27 Desa Botohili, Kec Teluk Dalam 6 rumah
K
F
NiSel
6
Unit
K
CV Luaha Gunde 26/KTR/BRR.N/PPP/2006 9 January 2006
28 Desa Lolozaria, Kec Amandraya 6 rumah
K
F
NiSel
6
Unit
K
CV Nusa Permai 47/KTR/BRR.N/PPP/2006 9 January 2006
29 Desa Sisobambowo, Kec Amandraya 10 rumah
K
F
NiSel
10
Unit
K
CV Intan 27/KTR/BRR.N/PPP/2006 9 January 2006
30 Desa Lolozaria, Kec Lolowau 15 rumah
K
F
NiSel
15
Unit
K
CV Mitra Karya 22/KTR/BRR.N/PPP/2006 9 January 2006
31 Desa Hilisangowola, kec. Lolomatua, 6 Rumah
K
F
Nisel
6
Unit
K
CV. Marao
-
62/KTR/BRRN/PPP/2005 01 Februari 2006 32 Desa Hilisangowola
K
F
NiSel
8
Unit
K
CV.RAI
226,000,000
71/KTR/BRR.N/PPP/2006 1 Februari 2006 33 Desa Koendrafo
K
F
NiSel
25
Unit
K
CV.Nias Baru 59/KTR/BRR.N/PPP/2006 28 Januari 2006
Lolomatua
K
F
NiSel
6
Unit
K
CV.Yamuna 73/KTR/BRR.N/PPP/2006 4 Februari 2006
5. Lembaga Sosial Lainnya
68,000,000,000
- Pembangunan Rumah Baru
683
Unit
34,150,000,000
- Rehabilitasi Rumah
900
Unit
18,000,000,000
- Pembangunan PSD Pemukiman
1585
Unit
15,850,000,000
TOTAL
536,548,500,000
-
377,984,995,000
Jumlah Paket Kontrak
137,284,725,851
36.32
48.78
REALISASI KEUANGAN
Jumlah Paket Swakelola
TGL 1 NOVEMBER 2006 Jumlah Paket Fisik
% Realisasi Fisik thdp DIPA
Jumlah Paket Non Fisik
Keterangan :
-
100
: SUDAH ADA BERITA ACARA TERIMA PEKERJAAN 100 % (PHO dan FHO)
(K / S) : K = Kontrak, S = Swakelola
Gunungsitoli,
November 2006
Kuasa Pengguna Anggaran,
(F / N) : F = Fisik, N = Non Fisik (K / L / P ) : K = Terkontrak (Paket Pekerjaan Yang Sudah Diberikan SPK) (K / L / P) : L = Proses Lelang (Paket Yang Sudah Melakukan Pelelangan) (K / L / P) : P = Persiapan (Paket Yang Belum Melakukan Pengumuman Pelelangan
Ir. BUSMIN SIAGIAN NIP 110036541
34.36
LAPORAN PELAKSANAAN KEGIATAN SATKER ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN 2006 (DANA HASIL MORATORIUM) Deputi Bidang Sub Bidang Satker Ka. Satker No. 1
PROYEK/ BAGIAN PROYEK KEGIATAN PAKET 2 1 Administrasi Umum Penyusunan Program dan Rencana 2 Kerja/Tenis/Program Study Perencana Rinci (DED) kegiatan TA. 2006 ABT Sektor Air Minum dan Air Limbah, Persampahan dan Drainase Nias dan Pulau Tello Supervisi pelaksanaan kegiatan sektor Air Minum, Air Limbah, Persampahan dan Drainase Nias TA. 2006 Peningkatan Prasarana dan Sarana 3 Persampahan Kabupaten Nias : Pengadaan truk sampah, Amroll truk dan kontainer di Kab. Nias TA. 2006 Kabupaten Nias Selatan : Pengadaan truk sampah, Amroll truk dan kontainer di Kab. Nias Selatan TA. 2006
: : : :
K/S
F/N
Lokasi
Volu me
Sat
3
4
5
6
7
2
Normalisasi/Rehab saluran drainase (Paket : 02) Normalisasi/Rehab saluran drainase (Paket : 03)
Pagu DIPA (Rp. ) 8 2,052,100,000
Pkt
800,000,000
Pkt
76,805,000
Status Bulan : 25 Nopember 2006
K/L/P
Nama Perusahaan/ No/Tgl. Kontrak
9
10
K
K
K
N
N
F
F
1 Kab. Nias dan Kab. Nisel
G.Sitoli
T. Dalam
11 2,052,100,000
Realisasi Keuangan
Fisik
Keu
Fisik
( Rp.)
(%)
(%)
12
13
14 1,046,663,318
15 51.00
16
253,253,000
35.09
721,655,000
1
P
Pkt
723,195,000
2 1
Pkt Pkt
3,160,000,000 1,580,000,000 1,580,000,000 1,580,000,000
L
1
Pkt Pkt
1 10 3
Pkt Pkt Pkt
1,580,000,000 9,485,000,000 2,512,432,600
L
1
K
749,442,700
K
K
F
G.Sitoli
590,271,600
K
K
F
G.Sitoli
1,172,718,300 2,302,082,400
K
Normalisasi/Rehab saluran drainase (Paket : 04) K
F
T. Dalam
701,145,000
K
Normalisasi/Rehab saluran drainase (Paket : 05) K
F
T. Dalam
399,388,600
K
Normalisasi/Rehab saluran drainase (Paket : 06) K
F
T. Dalam
424,301,400
K
Normalisasi/Rehab saluran drainase (Paket : 07) K
F
T. Dalam
329,670,000
K
Normalisasi/Rehab saluran drainase (Paket : 08) K
F
T. Dalam
447,577,400
2
Pkt
1,118,485,000 3,552,000,000
721,655,000
-
50.00
K
PT.Kosima Modulindo SPK-162/BRR.462052/VIII/2006/ 26 Agustus 2006 CV.Sekar Bhumi SPK-164/BRR.462052/VIII/2006/ 26 Agustus 2006 PT.Andry Karya Cipta SPK-166/BRR.462052/VIII/2006/ 26 Agustus 2006 CV.Arisandy Group SPK-150/NS/BRR.462052/VIII/2006/ 24 Agustus 2006 CV.Sekar Murni SPK-152/NS/BRR.462052/VIII/2006/ 24 Agustus 2006 CV.Dian Wira Putra SPK-172/NS/BRR.462052/VIII/2006/ 26 Agustus 2006 CV.Sekar Murni SPK-154/NS/BRR.462052/VIII/2006/ 24 Agustus 2006 CV.Duta Dolya Griya SPK-158/NS/BRR.462052/VIII/2006/ 24 Agustus 2006
-
-
253,253,000
-
-
-
-
4,414,515,000 2,362,432,600
G.Sitoli
Pkt
PT.Esconsoil Ensan SPK-99/BRR.462052/VIII/2006/ 9 Agustus 2006
-
-
F
5
-
-
K
Kabupaten Nias Selatan :
Sisa Tender untuk Pemb. Sistem Jaringan Drainase Sisa Luncuran : Pembangunan Sistem Jaringan Drainase di Kota Lahewa Pembangunan Sistem Jaringan Drainase di Kota Lahusa
Rencana (%)
Nilai Kontrak (Rp.)
Keterangan 17
Penyiapan Dok. Lelang K
4 Pembangunan Jaringan Drainase Kabupaten Nias : Normalisasi/Rehab saluran drainase (Paket : 01)
Format OC1
Bidang Perumahan,Insfrastruktur & Tataguna Lahan Pengembangan Kinerja Pengelolaan Air Minum dan Air Limbah Nias 462052 Ir. Busmin Siagian,Dipl,SE
-
35.09
-
-
-
-
-
-
1,452,256,751 526,514,680
32.90 22.29
-
Sudah pengumuman tetapi belum SPK (UD. Sumber Routin) Sudah pengumuman tetapi belum SPK (UD. Sumber Routin)
Terkontrak 699,442,700
20.00
61.09
139,888,540
20
41.58
540,271,600
30.00
47.05
162,081,480
30
45.36
1,122,718,300 2,052,082,400
20.00
95.06
224,544,660 925,742,071
20 45.11
39.41
651,145,000
30.00
69.25
195,343,500
30
60.95
349,388,600
39.25
44.25
137,135,026
39.25
68.80
374,301,400
71.91
77.35
269,160,137
71.91
77.35
279,670,000
73.24
79.17
204,830,308
73.24
78.79
397,577,400
30.00
69.79
119,273,100
30.00
63.01
Terkontrak
Terkontrak
Terkontrak
Terkontrak
Terkontrak
Terkontrak
Terkontrak
-
-
-
K
F
Kota Lahewa
1
Pkt
1,776,000,000
L
-
-
-
-
-
-
K
F
Kota Lahusa
1
Pkt
1,776,000,000
L
-
-
-
-
-
-
Sudah pengumuman tetapi belum SPK (PT. PAGAR GUNUNG) Sudah pengumuman tetapi belum SPK (PT. MARIS UTAMA JAYA)
No. 1
PROYEK/ BAGIAN PROYEK KEGIATAN PAKET 2 Pembangunan Jaringan Penyediaan Air 5 Bersih Kabupaten Nias : Rehabilitasi Jaringan Pipa Distribusi Pemasangan/Rehab. Jaringan Pipa Air Bersih (Pkt : 09)
Pembangunan Jaringan Penyediaan Air Bersih Kec. Alasa (Paket : 14) Pembangunan Jaringan Penyediaan Air Bersih Kec. Lotu (Paket : 15) Pembangunan Jaringan Penyediaan Air Bersih Kec. Gido (Paket : 16) Pembangunan Reservoir Kapasitas 100 M3 di Rumah sakit Umum Gunungsitoli (Paket 19) Rehabilitasi Jaringan Perpipaan RSU. G.Sitoli Kabupaten Nias Selatan :
Volu me
Sat
Pagu DIPA (Rp. )
K/L/P
Nama Perusahaan/ No/Tgl. Kontrak
Nilai Kontrak (Rp.)
Keu
Fisik
( Rp.)
(%)
(%)
3
4
5
6
7
8
9
10
11
12
13
14
15
16
8
Pkt
K
F
18,547,452,000 6,531,519,000
10,638,761,800 6,108,028,000
G.Sitoli
1,420,340,000
K
G.Sitoli
1,364,726,000
K
K
F
Kec. Lehewa
1
Pkt
617,644,000
K
K
F
Kec. Alasa
1
Pkt
901,331,000
K
K
F
Kec. Lotu
1
Pkt
1,173,478,000
K
K
F
Kec. Gido
1
Pkt
688,509,000
K
K
F
G.Sitoli
1
Pkt
292,000,000
K
K
F
G.Sitoli
1
Pkt
73,491,000 2,623,128,000
P
K
F
Kec. Lahusa
1
Pkt
531,380,000
K
Pembangunan Jaringan Penyediaan Air Bersih Kec. Gomo (Paket : 17) K
F
Kec. Gomo
1
Pkt
734,818,000
K
572,524,000
784,406,000
Peningkatan Prasarana dan Sarana Air Minum/Limbah (Kota Sirombu) - Paket 03
5
CV.Namora Anggareni SPK-160/NS/BRR.462052/VIII/2006/ 26 Agustus 2006
2,110,000,000
F
Kota Lahewa
1
Pkt
307,000,000
K
K
F
Kota Sirombu
1
Pkt
743,000,000
K
K
F
Kota Sirombu
1
Pkt
494,000,000
K
79.52
882,046,748
64
81.42
1,314,726,000
61.78
76.44
812,277,165
62
77.80
567,644,000
30.00
84.18
170,293,200
30
45.30
851,331,000
20.01
90.21
170,331,000
20
74.20
1,123,478,000
45.60
83.10
512,362,141
46
82.78
638,509,000
30.00
88.30
191,552,700
30
83.65
242,000,000
30.00
55.78
72,600,000
30
55.67
-
-
726,938,400
30.00
-
Terkontrak
Terkontrak
Terkontrak
Terkontrak
Terkontrak
Terkontrak Penyiapan Dokumen Lelang
Terkontrak 481,380,000
30.00
82.74
144,414,000
30
94.00
684,818,000
30.00
90.06
205,445,400
30
68.25
522,524,000
30.00
82.97
156,757,200
30
72.36
734,406,000
30.00
75.64
220,321,800
30
57.77
215,563,985
10.23
Terkontrak
Terkontrak
Terkontrak
306,069,898
100.00
100.00
-
-
100.00
742,997,645
100.00
100.00
-
-
100.00
493,241,888
100.00
100.00
-
-
100.00
CV.Andry Corporation
PT.Bina Raya Gema Reksa
K K
F F
Desa Tetehosi Maziaya Kec. Tuhemberua, Desa Hilimbowo Olora Kec. G.Sitoli Olora, Desa Fadoro Hunogoa Kec. Hiliduho Desa Helesilima/Holi Kec. Lahewa
Pkt
350,000,000
K
1 4
Pkt Pkt
216,000,000 3,947,000,000
K
CV.Auna Rahmat
Nilai Kontrak TA. 2005 2.198.778.000 Nilai Kontrak TA. 2005 1.686.676.000 Nilai Kontrak TA. 2005 1.460.938.000
Nilai Kontrak TA. 2005 1.121.944.000
CV.Pelita Jaya 1
17
Terkontrak 64.37
2,107,605,800
K
Keterangan
35.29 46.03
CV.Pelita Jaya
Peningkatan Prasarana dan Sarana Air Minum/Limbah (Paket 04) Peningkatan Prasarana dan Sarana Air Minum/Limbah (Paket 05) ABT 2006 : Penyempurnaan sarana dan Prasarana Air Bersih Kota Sirombu Penyempurnaan sarana dan Prasarana Air Bersih Kota Lahewa
Pkt
CV.Aek Ponik SPK 176/NS/BRR.462052/VIII/2006/ 26 Agustus 2006
3,753,965,339 2,811,462,954
1,370,340,000
2,423,128,000
CV.Sekar Bhumi SPK-178/NS/BRR.462052/VIII/2006/ 26 Agustus 2006
Pemasangan/Rehab. Jaringan Air Bersih (Pkt : 18) Pembayaran Sisa Kontrak DIPA TA. 2005 (Lanjutan)
PT.Mario Karya Abadi SPK-140/BRR.462052/VIII/2006/ 24 Agustus 2006 PT.Mario Karya Abadi SPK-141/BRR.462052/VIII/2006/ 24 Agustus 2006 CV.Sekar Bhumi SPK-168/BRR.462052/VIII/2006/ 26 Agustus 2006 PT.Razasa Karya SPK-170/BRR.462052/VIII/2006/ 26 Agustus 2006 PT.Gita Buana Yasa SPK-142/BRR.462052/VIII/2006/ 24 Agustus 2006 CV.Namora Anggareni SPK-158/BRR.462052/VIII/2006/ 26 Agustus 2006 CV.Gading Asia Mas SPK-146/BRR.462052/VIII/2006/ 24 Agustus 2006
CV.Galatta Jasa Utama Lestari SPK-174/NS/BRR.462052/VIII/2006/ 26 Agustus 2006
Pemasangan/Rehab. Jaringan Air Bersih (Pkt : 11)
Peningkatan Prasarana dan Sarana Air Minum/Limbah (Kota Sirombu) - Paket 02
Fisik
Lokasi
Pembangunan Jaringan Penyediaan Air Bersih Kec. Lahusa (Paket : 12)
Peningkatan Prasarana dan Sarana Air Minum/Limbah (Kota Lahewa) - Paket 01
Realisasi Keuangan
F/N
Pemasangan/Rehab. Jaringan Pipa Air Bersih (Pkt : 10) Pembangunan Jaringan Penyediaan Air Bersih Kec. Lahewa (Paket : 13)
Rencana (%)
K/S
349,732,384
100.00
100.00
215,563,985 -
100.00
100.00
215,563,985 -
-
-
F
Kota Sirombu
1
Pkt
2,499,000,000
L
-
0.00
-
-
-
K
F
Kota Lahewa
1
Pkt
988,000,000
L
-
0.00
-
-
-
Rp.
Rp.
Rp.
100.00
-
K
Rp.
Nilai Kontrak TA. 2005 Rp. 100.00 1.117.375.000 Sudah pengumuman tetapi belum SPK (PT. AUNA RAHMAT) Sudah pengumuman tetapi belum SPK (CV. DIAN WIRA PUTRA)
No. 1
PROYEK/ BAGIAN PROYEK KEGIATAN PAKET 2 Jembatan Pipa Steel Ø 150 mm di Jalan Diponegoro Gunungsitoli Pemasangan Pompa, Rumah Pompa dan Genset Sisa Tender untuk Pemb. Jaringan Penyediaan Air Bersih
Rencana (%)
Realisasi Keuangan
Fisik
K/S
F/N
Lokasi
Volu me
Sat
Pagu DIPA (Rp. )
K/L/P
Nama Perusahaan/ No/Tgl. Kontrak
Nilai Kontrak (Rp.)
Keu
Fisik
( Rp.)
(%)
(%)
3
4
5
6
7
8
9
10
11
12
13
14
15
16
K
F
G.Sitoli
1
Pkt
210,000,000
L
-
0.00
-
-
-
-
K
F
Desa Holi, Kec. Lahewa
1
Pkt
250,000,000
L
-
0.00
-
-
-
-
36.50 19.11
60.76
TOTAL Jumlah Paket Kontrak Jumlah Paket Swakelola Jumlah Paket Fisik Jumlah Paket Non Fisik Keterangan : (K / S) : K = Kontrak, S = Swakelola (F / N) : F = Fisik, N = Non Fisik (K / L / P ) : K = Terkontrak (Paket Pekerjaan Yang Sudah Diberikan SPK) (K / L / P) : L = Proses Lelang (Paket Yang Sudah Melakukan Pelelangan) (K / L / P) : P = Persiapan (Paket Yang Belum Melakukan Pengumuman Pelelangan RKA-KL Revisi ke 2 tgl. 16 Agustus 2006
Keterangan 17 Sudah pengumuman tetapi belum SPK (CV. KONSTRUKSI JAYA) Sudah pengumuman tetapi belum SPK (UD. FINIKA)
3,335,805,000 34,044,552,000
17,827,031,800
6,506,138,408 Terhadap DIPA 31.81749 % R.FISIK THDP PAGU DIPA
Gunungsitoli, 25 Nopember 2006 Kuasa Pengguna Anggaran,
Ir. Busmin Siagian, Dipl.SE
LAPORAN PELAKSANAAN KEGIATAN SATKER ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN 2006 (DANA HASIL MORATORIUM) Deputi Bidang
: Bidang Perumahan,Insfrastruktur & Tataguna Lahan
Sub Bidang
: Pengembangan Daerah Rawa dan Pengamanan Pantai Wilayah Nias
SATKER
: 464175
Ka SatKer
:A/n. Kasatker. Ir. Gunto Nababan, M.T.
No
Status Bulan : 23 November 2006
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
K/S
2
3
1
Format OC1
F/N
LOKASI
4
5
VOL 6
1 ADMINISTRASI UMUM Administrasi Proyek Pengadaan Alat Pengolahan Data
Pagu DIPA 8
K/L/P 9
Pengawasan / Supervisi Nias Selatan Pengawasan / Supervisi Konstruksi - pengaman pantai Nias Selatan
4
Fisik
( RP )
%
(%)
10
11
12
13
14
15
16
17
Rencana (%)
Realisasi Keuangan
923,960,000
580,102,760
859,000,000
515,142,760
64,960,000
64,960,000
50,000,000
50,000,000
14,960,000
14,960,000
PT.Logikreasi Utama/Nomor:002/BRRCV.Gading Asia Mas/Nomor:007/BRR.4641
Fisik
62.78
750,000,000 K
N
Kab.Nisel
1
750,000,000
L
9,000,000,000
-
Pengamanan Pantai Gunung Sitoli Tahap I
K
-
Pengamanan Pantai Moawo
K
-
Pengaman pantai Lahusa
K
F
Kab.Nisel
1
2,400,000,000
L
-
Pengaman pantai Hilisataro
K
F
Kab.Nisel
1
7,100,000,000
L
Pengaman pntai Teluk Dalam
K
F
Kab.Nisel
1
2,900,000,000
L
F
Kab.Nias
1
5,000,000,000
K
1
4,000,000,000
K
ABT
P.T. Basuki Rahmanta Putra Nomor :S05/BRR.464175/VI/2006 P.T. Basuki Rahmanta Putra Nomor :S06/BRR.464175/VI/2006
3,854,442,000
30
70.44
770,888,400
20
63.90
3,056,156,000
20
54.00
611,231,200
20
53
568,161,000
30
78.65
170,448,300
30
30
2,132,670,660
25.38
12,400,000,000
Pengawasan / Supervisi Konstruksi Pengawasan / Supervisi Konstruksi pengaman pantai di Nias -
600,000,000 K
F
Kab.Nias
1
23,674,000,000
TOTAL
P.T.Pemetar Argeo Consultant Engineering Nomor : S08/BRR.464175/VIII/2006
8,402,719,000
0
Jumlah Paket Swakelola
Jumlah Paket Fisik
5
Jumlah Paket Non Fisik
2
Keterangan : (K / S) : K = Kontrak, S = Swakelola F K L P
K
9
Jumlah Paket Kontrak
(F / N) : (K / L / P ) : (K / L / P) : (K / L / P) :
600,000,000
= Fisik, N = Non Fisik = Terkontrak (Paket Pekerjaan Yang Sudah Diberikan SPK) = Proses Lelang (Paket Yang Sudah Melakukan Pelelangan) = Persiapan (Paket Yang Belum Melakukan Pengumuman Pelelangan)
%REAL.FISIK thdp DIPA
17.97
Ket. 18
22,750,000,000
Bangunan Pengaman Pantai Kab. Nias
-
Keu
65,000,000
2 PEMBANGUNAN PRASARANA PENGAMANAN PANTAI
3
20
924,000,000
K
2
NAMA PERUSAHAAN
859,000,000
K
1
Nilai Kontrak Awal (Rp)
Nilai Kontrak
NOMOR/TGL KONTRAK
50.62
LAPORAN PELAKSANAAN KEGIATAN SATKER ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN 2006 (DANA HASIL MORATORIUM) Deputi Bidang Sub Bidang Satker Ka. Satker No
: : Bidang BidangPerumahan, Perumahan,Infrastruktur Infrastruktur&&Tata TataGuna GunaLahan Lahan : : Pengendalian PengendalianBanjir BanjirNias Nias : : 464162 464162 MM : : Ir.Ir.Siduhu SiduhuAro AroDachi, Dachi,MM PROYEK / BAGIAN PROYEK KEGIATAN PAKET
1 I
2
Format OC1 Status Bulan : 25 November 2006
K/S F/N 3
4
LOKASI 5
VOL 6
SAT 7
ADMINISTRASI UMUM Administrasi Proyek Pengadaan Alat Pengolahan Data
Pagu DIPA (Revisi 16 K/L/P Agt 2006) 8
9
NAMA PERUSAHAAN 10
Penyusunan Detail Desain 1 SID Sungai Di Kabupaten Nias ( 3 Lokasi ) : - Sungai Sui, Ds. Hili Fadolo Kec. Mandrehe - Sungai Moi, Ds. Lolofitu dan Ds. Usomo I Kec. Lolofitu Moi - Sungai Batoto Kec. Lahewa 2
SID Sungai Di Kabupaten Nias Selatan ( 2 Lokasi ) : - Sungai Zuzua Ds. Hilisaoto Kec. Lahusa - Sungai Soi Ds. Hiliorahua dan Hili Ana'a Zuzua Kec. Gomo
11
1,244,900,000 1,144,200,000 100,700,000
K
N Mandrehe L. Moi Lahewa
1
Pkt
500,000,000 270,000,000
K
N
1
Pkt
230,000,000
Lahusa Gomo
Nilai Kontrak
Rencana (%)
Addendum
Keu 13
12
Fisik 14
1,239,625,000 1,144,200,000 95,425,000 PT.Logikreasi Utama 002 /BRR-PBN/SPK/2006 9 Maret 2006 CV.Moi Mulia Perkasa 003/BRR-PBN/SPK/2006 9 Maret 2006 CV.Gading Asia Mas 053/BRR-464162/VII/2006 11 Juli 2006
II
Nilai Kontrak Awal
NOMOR/TGL KONTRAK
Realisasi Keuangan ( RP ) 15
Fisik (%)
% 16
17
18
-
46,000,000
33,425,000 S16,000,000 494,500,000 267,500,000
494,500,000 267,500,000
100
100
494,500,000 267,500,000
100
100
227,000,000
227,000,000
100
100
227,000,000
100
100
34,086,800,000
53,626,654,900
32,019,987,446
529,215,500 2,822,654,000
529,215,500 844,057,000
100
100
414,568,875 282,265,000
33
100
529,215,500
529,215,500
100
100
132,303,875
9,391,633,900 9,391,633,900
2,897,207,440 2,897,207,440
100
100
2,897,207,440 2,897,207,440
100
27,139,997,500 7,966,299,000
13,517,997,506 4,599,927,832
100
100
13,517,997,506 4,599,927,832
100
100
K
PT. ERDRANT RIZKI UTAMA No. 002g/SPK/BRR-PBN/2006 Tgl : 20 April 2006
PT. KORIDOR MULTIGATRA No. 022e/SPK/BRR-PBN/2006 Tgl : 20 April 2006
III PERAWATAN /REHAB. PRASARANA PENGENDALIAN BANJIR Sisa Luncuran Supervisi Normalisasi Sungai : 1 >> Supervisi Normalisasi Sungai (lanjutan)
K
N
Nias & Nias Selatan
1
Pkt
850,000,000 290,000,000
>> Supervisi Normalisasi Sungai Nou, Muzoi, dan Lafau
K
N
Nias
1
Pkt
560,000,000
Normalisasi Sungai di Kabupaten Nias Selatan 2 Paket Normalisasi Sungai Pengendalian Banjir Kec. Lahusa Amandraya, Teluk Dalam & Gomo, Kab Nias Selatan (Lanjutan)
K
F
Nias Selatan
1
Pkt
3,011,800,000 3,011,800,000
K
PT. ADHI KARYA (Persero) Tbk. No. HK.02.07-PBPP.N/11/2005 Tgl : 08 Des 2005
Normalisasi Sungai di Kabupaten Nias 3 Paket Rehab Pengendalian Banjir Kec. Gunung Sitoli Kabupaten Nias (Lanjutan)
K
F
Nias
1
Pkt
13,525,000,000 4,600,000,000
K
PT. FAJAR PARAHIYANGAN No. HK.02.07-PBPP.N/09/2005 Tgl : 08 Des 2005
K
Ket.
PT. PPA CONSULTANT No. HK.02.07-PBPP.N/06/2005 Tgl : 02 Des 2005 PT. DEKA KONSULTAN No. S-03/BRR-464162/IX/2006 2-Sep-06
20,140,196,621
25
63 TERMIN 1
100
4
Paket Rehab Pengendalian Banjir Kec. Tuhemberua, Lotu, Namehalu Esiwa dan Lahewa Kabupaten Nias (Lanjutan)
K
F
Nias
1
Pkt
4,970,000,000
K
PT. BASUKI RAHMANTA PUTRA No. HK.02.07-PBPP.N/10/2005 Tgl : 08 Des 2005
12,631,318,700
4,963,914,461
100
100
4,963,914,461
100
100
5
Paket Rehab Pengendalian Banjir Kec. Sirombu, Mandrehe, Gido, Silite, Idanogawo Kabupaten Nias (Lanjutan)
K
F
Nias
1
Pkt
3,955,000,000
K
PT. LEO TUNGGAL MANDIRI No. HK.02.07-PBPP.N/11/2005 Tgl : 08 Des 2005
6,542,379,800
3,954,155,213
100
100
3,954,155,213
100
100
K
F
G.Sitoli
1
Pkt
11,318,960,000 1,654,400,000
K
PT. SINAR SURYA SUMATERA No. S-01/BRR-464162/VII/2006 Tgl : 30 Agustus 2006
11,364,439,000 3,407,000,000
11,364,439,000 3,407,000,000
100
100
2,272,887,800 681,400,000
20
18.190
Uang Muka
100
100
739,400,000
20
24.35
Uang Muka
ABT Nias Perkuatan Tebing dan Normalisasi Sungai NOU 6
7
Normalisasi Sungai Muzoi dan Lafau
K
F
Lahewa
1
Pkt
1,968,000,000
K
PT. BUDI GRAHA PERKASA UTAMA No. S-02/BRR-464162/VII/2006 Tgl : 30 Agustus 2006
3,697,000,000
3,697,000,000
8
Normalisasi sungai Lahomi dan Oyo
K
F
Mandrehe
1
Pkt
2,978,400,000
K
PT. ADHI KARYA (Persero) Tbk. No. S-04/BRR-464162/X/2006 Tgl : 11 Oktober 2006
3,340,456,000
3,340,456,000
100
100
668,091,200.00
20.00
2.54
Uang Muka
9
Normalisasi sungai dan Perkuatan Tebing sungai Idanogawo
K
F
Id. Gawo
1
Pkt
974,160,000
K
CV. KARYA MITRA KONSTR. No. S-06/BRR-464162/2006
919,983,000
919,983,000
100
100
183,996,600.00
20.00
9.97
Uang Muka
Tgl : 11 Okt 2006 10
Normalisasi sungai dan Perkuatan Tebing sungai Moro'o
K
F
Mandrehe
1
Pkt
576,000,000
L
-
-
-
-
-
-
-
-
Proses Lelang
11
Normalisasi sungai dan Perkuatan Tebing sungai Gido Zebua
K
F
Gido
1
Pkt
656,000,000
L
-
-
-
-
-
-
-
-
-sda-
12
Normalisasi sungai dan Perkuatan Tebing sungai Solagasi
K
F
1
Pkt
656,000,000
L
-
-
-
-
-
-
-
-
-sda-
13
Normalisasi sungai dan Perkuatan Tebing sungai Moi
K
F
1
Pkt
480,000,000
L
-
-
-
-
-
-
-
-
-sda-
14
Normalisasi sungai dan Perkuatan Tebing sungai Sui
K
F
1
Pkt
480,000,000
L
-
-
-
-
-
-
-
-
-sda-
15
Normalisasi sungai dan Perkuatan Tebing sungai Muzoi Hulu
K
F
1
Pkt
416,000,000
L
-
-
-
-
-
-
-
-
-sda-
16
Normalisasi sungai dan Perkuatan Tebing sungai Bobatalu
K
F
1
Pkt
480,000,000
L
-
-
-
-
-
-
-
-
-sda-
ABT Nias Selatan Normalisasi dan Perkuatan Tebing Sungai Manawa Dano, Idanomi 9
K
F
Lolowa'u
1
Pkt
4,181,040,000 1,301,520,000
L
PT. IPASIN No. S-05/BRR-464162/X/2006 Tgl : 11 Oktober 2006
100
100
20.00
1.45
10
Normalisasi Sungai dan Perkuatan Tebing sungai Siwalawa
K
F
Lolowa'u
1
Pkt
640,000,000
L
-
-
-
-
-
-
-
-
Proses Lelang
11
Normalisasi Sungai dan Perkuatan Tebing sungai Soi
K
F Amandraya
1
Pkt
959,520,000
L
-
-
-
-
-
-
-
-
-sda-
12
Normalisasi Sungai dan Perkuatan Tebing sungai Susua dan Saua
K
F
T.Dlm & Lahusa
1
Pkt
640,000,000
L
-
-
-
-
-
-
-
-
-sda-
13
Normalisasi Sungai dan Perkuatan Tebing sungai Masio
K
F
Lahusa
1
Pkt
640,000,000
L
-
-
-
-
-
-
-
-
-sda-
K
N
Nias
1
Pkt
1,200,000,000 600,000,000
K
PT. KREASI CIPTA KARYA No. S-07/BRR-464162/XI/2006 Tgl : 01 NOV 2006
-
-
-
-
K
N
Nias
1
Pkt
600,000,000
K
PT. PPA CONSULTANT No. HK.02.07-PBPP.N/06/2005 Tgl : 02 Des 2005
100
100
Supervisi Supervisi Pengawasan Sungai 10
11
Supervisi Pengawasan (Lanjutan)
TOTAL Jumlah Paket Kontrak Jumlah Paket Swakelola
Keterangan : (K / S) : K (F / N) : F (K / L / P ) : K (K / L / P) : L (K / L / P) : P
Moi
35,831,700,000 13 0 Jumlah Paket Fisik 11 Jumlah Paket Non Fisik 0
Kontrak Dipa 2006
2,378,715,000 2,378,715,000
2,378,715,000 2,378,715,000
2,822,654,000 -
1,332,413,000 488,356,000
2,822,654,000
844,057,000
54,121,154,900
32,514,487,446
475,743,000.00 475,743,000.00
561,792,000.00
561,792,000
67
20,634,696,621
63.463
63.54
32,514,487,446 % REALISASI THDP DIPA
Gunungsitoli, 25 November 2006 = Kontrak, S = Swakelola = Fisik, N = Non Fisik = Terkontrak (Paket Pekerjaan Yang Sudah Diberikan SPK) = Proses Lelang (Paket Yang Sudah Melakukan Pelelangan) = Persiapan (Paket Yang Belum Melakukan Pengumuman Pelelangan
100
an. Kuasa Pengguna Anggaran Penguji SPM
Marniani Zebua, ST NIP. 400046564
57.66
Uang Muka
LAPORAN PELAKSANAAN KEGIATAN SATKER ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN 2006 (DANA HASIL MORATORIUM) Deputi Bidang Sub Bidang SATKER Ka SatKer No
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
1 I ADMINISTRASI UMUM Administrasi Proyek Pengadaan Alat Pengolahan Data
II
Format OC1
: Bidang Perumahan,Insfrastruktur & Tataguna Lahan : Irigasi Wilayah Nias : 464250 : Ir.Frenius Manik
2
Status Bulan : 25 Nopember 2006
K/S 3
F/N 4
LOKASI 5
VOL
SAT
6
7
KONSULTAN SUPERVISI
Pagu DIPA 8 1,176,500,000 1,089,900,000 86,600,000
NAMA PERUSAHAAN K/L/P NOMOR/TGL KONTRAK / ADDENDUM 9 10
250,000,000
1
Supervisi / Pengawasan Kontruksi ( tersebar )
K
F
2
Peren. dan Supervisi (Gedung)
K
F
PT. Erdrant Rizki Utama HK.02.07/BRR-IWN/16 28 Juni 2006 PT. Duta Mulia Persada KU.08.01/BRR-IWN/20 11 Juli 2006 KU.08.01/BRR-IWN/20.1 18 September 2006
250,000,000
22,838,254,000 21,888,254,000 3,000,000,000
III REHABILITASI JARINGAN IRIGASI Belanja Modal Irigasi 1 - Rehap / rekons Jaringan Irigasi di Kab Nias
PT. Nunut Karya HK.02.07/BRR-IWN/14 28 Juni 2006 PT. Pura Kencana Karya
Nilai Kontrak Nilai Kontrak 11 1,176,500,000 1,089,900,000 86,600,000
Addendum 12
Rencana (%) Keu 13
Realisasi Keuangan Fisik 14
284,211,400
287,221,500
249,221,500
249,221,500
224,299,350
90%
34,989,900
38,000,000
38,000,000
100%
27,177,446,922 26,893,235,522 2,411,285,000
22,669,536,031 2,638,303,000
1,215,519,000
1,328,430,000
1,130,432,670 93.00%
1,088,147,060 91.00%
( RP ) 15 777,648,146 693,784,146 83,864,000
Fisik
% 16 80.2 63.66 96.84
Ket.
(%) 17
18
159,501,760
159,501,760
64
93.00
231,775,995
100.00
38,000,000
8,029,662,901 7,288,474,001 1,821,386,039
- Rehab DI Dumi ( 250 Ha )
K
F
Nias
1
Pkt
1,500,000,000
K
- Rehab DI Lagundri
K
F
NiSel
1
Pkt
1,500,000,000
K
1,195,766,000
1,309,873,000
1 1
Pkt Pkt
3,767,261,000 3,467,261,000 300,000,000
3,801,535,022 3,530,748,022 270,787,000
3,801,535,022 3,530,748,022 270,787,000
1 1 1
Pkt Pkt Pkt
1,577,877,000 505,300,000 466,500,000 606,077,000
1,577,877,000 505,300,000 466,500,000 606,077,000
1,577,877,000 505,300,000 466,500,000 606,077,000
12,250,443,709
9,321,921,009
4,696,427,409
4,696,427,409
5%
2.00
292,085,000
292,085,000
0%
0.00
Menunggu Uang Muka
293,241,000
293,241,000
0%
0.00
Menunggu Uang Muka
294,517,000
294,517,000
0%
0.00
Menunggu Uang Muka
4,298,359,000
1,685,296,000
298,504,000
298,504,000
1,783,115,700
1,467,656,000
1,103,926,439
91
94.00
1,142,587,860
717,459,600
60
95.00
1,135,977,700
3,801,535,022 3,530,748,022 270,787,000
100.00 100.00
100.00 100.00
3,530,748,022 270,787,000
HK.02.07/BRR-IWN/15
- Pembayaran sisa Kontrak Dipa - L - Rehap/ Rekon Jaringan Irigasi Nias dan nias Selatan - Supervisi Pengawasan Konstruksi - Program Pendukung Kegiatan ESTP - Equipment - Community Empowerment / Training - Supervision / Management
S S S
N N N
- Rehabilitasi Irigasi di Kabupaten Nias
28 Juni 2006
8,507,916,000
-
34,274,022 diambil dari sisa tender DI. Lagundri
Revisi MAK/DIPA Revisi MAK/DIPA Revisi MAK/DIPA 1,665,552,940
PT. Candra Bumi Sentosa HK.02.07/BRR/IWN/21 - Rehab DI Gido Zebua (128 Ha)
K
F
Nias
1
Pkt
Paket I GP3A Sahabat
K
F
Nias
1
Pkt
Paket II GP3A Setia
K
F
Nias
1
Pkt
Paket III GP3A Sederhana
K
F
Nias
1
Pkt
- Rehab DI Moafoa (276 Ha)
K
F
Nias
1
Pkt
P3A Moa Foa
K
F
Nias
1
Pkt
- Rehab DI Fusi (122 Ha)
K
F
Nias
1
Pkt
P3A Fusi
K
F
Nias
1
Pkt
- Rehabilitasi Irigasi di Kabupaten Nias Selatan
2
1,685,296,000 K
1,467,656,000 K
22 Agustus 2006 HK.02.07/BRR/IWN/01 Tgl 16-10-2006 HK.02.07/BRR/IWN/02 Tgl 16-10-2006 HK.02.07/BRR/IWN/03 Tgl 16-10-2006 PT. Putrilan & Brother HK.02.07/BRR/IWN/22 22 Agustus 2006 HK.02.07/BRR/IWN/04 Tgl 16-10-2006 CV. Ledy HK.02.07/BRR/IWN/23 HK.02.07/BRR/IWN/05 Tgl 16-10-2006
5,035,200,000
- Rehab DI Lazagaramba (250 Ha)
K
F
Nisel
1
Pkt
P3A Lazagaramba
K
F
Nisel
1
Pkt
- Rehab DI Siwalawa (300 Ha)
K
F
Nisel
1
Pkt
P3A Siwalawa
K
F
Nisel
1
Pkt
Rehabilitasi Gedung
- Rehabilitasi kantor UPT / PSDA Nias dan Mess
5,354,964,000 K
1,457,685,000 K
3,577,515,000 K
PT. Torpana HK.02.07/BRR/IWN/24 22 Agustus 2006 HK.02.07/BRR/IWN/06 Tgl 16-10-2006 PT. Mitra Perdana HK.02.07/BRR/IWN/25 22 Agustus 2006 HK.02.07/BRR/IWN/07 Tgl 16-10-2006
950,000,000
K
F
Nias
1
Pkt
300,000,000 K
CV. Jimmy Clynton HK.02.07/BRR-IWN/17 07 Juli 2006 KU.08.01/BRR-IWN/17.1 18 September 2006 KU.08.01/BRR-IWN/17.2 24 Oktober 2006
294,194,600
294,194,600
6,852,094,791
5,329,900,000
2,232,489,091
1,457,685,000
294,700,000
294,700,000
4,029,405,700
3,577,515,000
234,821,370
214,917,950
89,155,785
111,624,455
201,470,285
295,500,000
5%
859,671,800
20.00
0.00
5%
1.00
0%
0.00
5%
6.00
0%
0.00
5%
805,881,140
20.00
0%
861,130,000
885,588,000
269,032,000
269,032,000
5.00
0%
1.50
93,928,548 Fiscal Years/Revisi MAK/DIPA
214,917,950 Fiscal Years/Revisi MAK/DIPA Menunggu Uang Muka 17,831,157 Fiscal Years/Revisi MAK/DIPA Menunggu Uang Muka
133,949,345 Fiscal Years/Revisi MAK/DIPA Menunggu Uang Muka
60,441,086 Fiscal Years/Revisi MAK/DIPA
0.00
Menunggu Uang Muka
741,188,900
269,032,000
100%
269,032,000
100.00
100.00
269,032,000
No
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
1
2
K/S
F/N
LOKASI
VOL
SAT
3
4
5
- Rehabilitasi kantor ranting I dan Rehabilitasi Rumah Dinas 1 unit
K
F
Nias
1
Pkt
- Rehabilitasi Rumah Dinas 2 unit
K
F
Nias
1
Pkt
TOTAL Jumlah Paket Kontrak Jumlah Paket Swakelola
6
7
NAMA PERUSAHAAN K/L/P NOMOR/TGL KONTRAK / ADDENDUM 8 9 10 CV. Dua Ribu HK.02.07/BRR-IWN/19 316,666,667 K 07 Juli 2006 KU.08.01/BRR-IWN/19.1 18 September 2006 KU.08.01/BRR-IWN/19.2 24 Oktober 2006 CV. Tania Gemilang Pratama HK.02.07/BRR-IWN/18 333,333,333 K 07 Juli 2006 KU.08.01/BRR-IWN/18.1 18 September 2006
Pagu DIPA
24,264,754,000
Jumlah Paket Fisik Jumlah Paket Non Fisik
22 3 22 3
Nilai Kontrak Nilai Kontrak 11
295,820,000
Addendum 12
309,204,000
296,278,000
307,352,000
29,239,534,922
23,842,345,531
Rencana (%) Keu 13
Realisasi Keuangan Fisik 14
( RP ) 15
% 16
Fisik Ket.
(%) 17
18
309,204,000
100%
309,204,000
100.00
100.00
309,204,000
307,352,000
100%
162,952,900
55.00
96.00
295,057,920
8,966,812,807
37.61
32.48
7,744,238,583
% Realisasi Fisik thdp DIPA
31.92
LAPORAN PELAKSANAAN KEGIATAN SATKER SI NAD-NIAS APBN 2006 (DANA HASIL MORATORIUM Deputi Bidang Sub Bidang SATKER Ka SatKer No PROYEK / BAGIAN PROYEK KEGIATAN
: Bidang Perumahan,Insfrastruktur & Tataguna Lahan : Peningkatan Kualitas Ketenaga Listrikan Nias : 464595 : HARYONO K/S F/N LOKASI
Format OC1 Status Bulan : 23 November 2006 VOL
SAT
Pagu DIPA
K/L/P
NAMA PERUSAHAAN
Nilai Kontrak Awal
NOMOR/TGL KONTRAK 1
2
3
4
5
6
7
PEMBANGUNAN PRASARANA
8
9
10
Nilai Kontrak ncana (%) Addendum I
11
Keu Fisik 12 13
21,485,222,000
ADMINISTRASI UMUM
942,500,000
237,800,000
Realisasi Keuangan ( RP ) 14
% 15
6,326,291,756
29.4
748,516,500
79.4
329,000,000
69.4
RealisasiFisik
Ket.
16
17
I Belanja Uang Honor Tidak Tetap
474,000,000
Belanja Barang Operasional lainnya
22,200,000
Belanja Barang Non Operasional
54,000,000
K
Belanja Anggaran Daya dan Jasa
24,000,000
K
258,000,000
K
Belanja Sewa - Sewa rumah / tahun
K
- Sewa mobil
K
Belanja Perjalanan Biasa
119,000,000 PT. Sejahtera Mulia Kencana PJ-001/BRR-464595/V/2006 28 April 2006
PEMBANGUNAN JARINGAN TRANSMISI
179,300,000
69.5
119,000,000
100.0
6,800,000
17.8
46,689,500
64.8
5,577,775,256
19,155,113,500
selesai
41.7
20,542,722,000
Belanja Modal, Irigasi dan Jaringan
33.8
49500000
PT. Sejahtera Mulia Kencana PJ-006/BRR-464595/V/2006 9 Agustus 2006
72,100,000
-
18,227,000
118,800,000
38,200,000
Belanja Modal Peralatan dan Mesin
II
-
27.2
18,170,121,747
1,387,608,500
1.
2.
3.
4.
5.
6. 7.
BELUM TERPAKAI Rehabilitasi dan Pemberatan Kawat HUTM AAAC 70 mm2 menjadi 150 mm2 Feeder GS01 jalur pantai dan Rehabilitasi dan Pemberatan Kawat HUTM AAAC 70 mm2 menjadi 150 mm2 Feeder GS01 jalur pantai dan penggantian tiang besi kropos Rehabilitasi dan Pemberatan Kawat HUTM AAAC 70 mm2 menjadi 150 mm2 Feeder GS01 jalur pantai dan penggantian tiang besi kropos Rehabilitasi dan Pemberatan Kawat HUTM AAAC 70 mm2 menjadi 150 mm2 Feeder GS01 jalur pantai sepanjang Perluasan jaringan distribusi HUTM, Trafo dan HUTR untuk melayani Perumahan SIROMBU dan SORAKE Penggantian tiang besi 9 mtr keropos menjadi tiang besi 9 mtr 156 Dan 247 batang, HUTR khusus kota Pemasangan trafo sisip 12 bh
K
F
Nias Selatan 12.121 Kms
2,859,989,000
K
CV. Mangun Coy PJ-001/BRR.464595/VI/2006 29 Juni 2006
2,794,803,000
100
100
1,257,661,350
45.0
100.0
Proses BA Pembayaran 100%
K
F
Nias Selatan
10.87
Km
2,358,990,300
K
PT. Mackela PJ-002/BRR.464595/VI/2006 29 Juni 2006
2,323,219,150
100
100
1,045,448,618
45.0
100.0
Proses BA Pembayaran 100%
K
F
Nias Selatan
11.6
Km
2,499,452,500
K
PT. Bina Teknika PJ-003/BRR.464595/VI/2006 29 Juni 2006
2,462,044,100
100
100
1,107,919,845
45.0
100.0
Proses BA Pembayaran 100%
K
F
Nias
17.392
Km
1,807,787,300
K
PT. Kencana Jaya PJ-004/BRR.464595/VI/2006 29 Juni 2006
1,797,553,800
45
100
808,899,210
0.5
100.0
Proses BA Pembayaran 100%
K
F
Nias Selatan
10
Set
590,566,900
K
CV. UT. Rahman PJ-005/BRR.464595/VI/2006 29 Juni 2006
573,484,392
588,298,133 100
100
588,298,133
45.0
100.0
Proses BA Pembayaran 100%
K
F
Nias
247
Btg
967,556,100
K
CV. Sidohita ETC PJ-006/BRR.464595/VI/2006 29 Juni 2006
903,430,100
100
100
100.0
Proses BA Pembayaran 100%
K
F
Nias & Nisel
12
Bh
767,679,800
K
CV. Sidohita ETC
721,768,100 100
100
728,378,000
721,768,100
45.0
100.0
Proses BA Pembayaran
No
PROYEK / BAGIAN PROYEK KEGIATAN
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
NAMA PERUSAHAAN
Nilai Kontrak Awal
NOMOR/TGL KONTRAK 1 8.
9.
10.
11.
12.
13.
14.
2 Penggeseran tiang sebanyak 15 btg akibat pelebaran drainase di JL Gomo GUNUNGSITOLI Rehabilitasi dan pemberatan kawat HUTM AAAC 70 mm2 menjadi 150 mm2 feeder GS01 jalur pantai sepanjang 8,43 kms dari desa GAJAHMAN0 Rehabilitasi dan pemberatan kawat HUTM AAAC 70 mm2 menjadi 150 mm2 feeder GS01 jalur pantai sepanjang 6,768 kms dari desa SILIMABANUA s/d TETEZOU Rehabilitasi dan pemberatan kawat HUTM AAAC 70 mm2 menjadi 150 mm2 feeder GS01 jalur pantai sepanjang 4,533 Renc penggantian LPJU di kota GUNUNGSITOLI Pembangunan jaringan distribusi HUTM sepanjang 0,187 kms (u Ktr Bupati Nias) sisip trafo distribusi sebanyak 9 bh 1030 kVA, HUTRnp sepanjang 0 208 kms HUTRk Pemasangan trafo distribusi , HUTM, dan HUTR untuk pelayanan desa
3
4
5
6
7
8
9
Nilai Kontrak ncana (%) Addendum I
11
Keu Fisik 12 13
CV. Sidohita ETC PJ-008/BRR.464595/VI/2006 29 Juni 2006
47,780,000
100
10
( RP ) 14
% 15
16
17
-
20.0
Pelaksanaan
1,160,877,820
-
20.0
Pelaksanaan
CV. Sidohita ETC PJ-12/BRR.464595/VII/2006 04 September 2006
662,657,795
-
100.0
Finishing, Proses pembayaran 100%
P
CV. Ronel Nias Teknik SPK 002/BRR.464595/2006. Tanggal 09 Oktober 2006
48,604,000
-
20.0
SPK
1,051,064,300
K
PT. Ardo Citra Mandiri PJ-14/BRR.464595/VII/2006 04 September 2006
946,500,900
-
20.0
Pelaksanaan
98,212,800
K
CV. UT. Rahman PJ-09/BRR.464595/VI/2006 10 September 2006
Nias
15
Btg
47,780,300
K
F
Nias Selatan
8.43
KMS
1,526,413,500
K
PT. Mackela PJ-10/BRR.464595/VII/2006 04 September 2006
1,340,773,600
K
F
Nias Selatan
6.768
KMS
1,351,061,700
K
PT. Mackela PJ-11/BRR.464595/VII/2006 04 September 2006
K
F
Nias Selatan
4.533
KMS
741,360,900
K
K
F
Nias
2
Set
48,629,700
K
F
Nias
K
F
Nisel
97,549,000
100
100
100
Ket.
SELESAI
F
47,780,000
RealisasiFisik
100.0
K
100
Realisasi Keuangan
-
100
Finishing, Proses pembayaran 100%
100
15
Pemasangan VBOS 5 unit dan Sectionalizer 1 unit di Rtg GSITOLI dan TELUKDALAM
K
F
Nisel
1
pkt
677,904,400
16
Pengadaan MDU Gunungsitoli
K
F
Nias
1
pkt
712,601,000
K
CV. Sidohita ETC PJ-13/BRR.464595/VII/2006 04 September 2006 CV. Ronel Nias Teknik
615,924,240
-
100.0
Finishing, Proses pembayaran 100%
PJ-
016/BRR.464595/2006. Tanggal 17
711,460,300
KONTRAK
955,081,550
KONTRAK
Oktober 2006 Sidohita Electric Trading, Co. PJ17
Pengadaan MDU Nias Selatan
K
F
Nisel
1
pkt
956,063,000
015/BRR.464595/2006. Tanggal 17 Oktober 2006
18
Pembangunan Trafo 1bh 100 kVA 3 fasa dan JTM 0,1 kms untuk pelayanan kantor Perwakilan BRR Nias di
TOTAL Jumlah Paket Kontrak Jumlah Paket Swakelola Jumlah Paket Fisik Jumlah Paket Non Fisik
K
F
Nisel
1
pkt
92,000,000
21,485,222,000
18,407,921,747 1,310,066,233
6,326,291,756
34
%REAL.FISIK thdp DIPA
Keterangan : (K / S) : K (F / N) : F (K / L / P ) : K (K / L / P) : L (K / L / P) : P
= Kontrak, S = Swakelola = Fisik, N = Non Fisik = Terkontrak (Paket Pekerjaan Yang Sudah Diberikan SPK) = Proses Lelang (Paket Yang Sudah Melakukan Pelelangan) = Persiapan (Paket Yang Belum Melakukan Pengumuman Pelelangan
74.46
63.79349881
LAPORAN PELAKSANAAN KEGIATAN SATKER ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN 2006 (DANA HASIL MORATORIUM) Deputi Bidang Sub Bidang SATKER Ka Sat Ker
Format OC1
: Bidang Perumahan,Insfrastruktur & Tataguna Lahan : Pemeliharaan Rehab,Peningkatan Pembangunan SarPras Transportasi Nias : 440759 : Ir.Poltak Gordon , MSc
Status Bulan : 23 November 2006
No
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
1
2
3
4
5
6
7
8
9
S S S S S S S
N F F N F N F
10 10 10 1 12 56 -
bln bln pkt bln bln Fr
I
II
ADMINISTRASI UMUM Administrasi Proyek a. Uang honor tdk tetap b. Belanja barang operasional lainnya c. Belanja bahan d. Belanja langganan daya dan jasa e. Belanja sewa f. Belanja Perjalanan biasa g. Belanja modal peralatan dan mesin
40 40 40 40 87.5 40 40
9,635,000,000 1,305,000,000
Perencanaan Pemb. Kantor Pos di Hiliweto
K
N
50,000,000
2
Perencanaan Pemb. Kantor Pos di Tetehosi
K
N
50,000,000
3
Perencanaan Pemb. Kantor Pos di Tuhemberua
K
N
50,000,000
4
Perencanaan Pemb. Kantor Pos di Teluk Dalam
K
N
50,000,000
5
Perencanaan Pemb. Kantor Pos di Lahewa dan Sirombu
K
N
45,000,000
6
Pengawasan Pemb.Kantor Pos Lahewa dan Sirombu
K
N
50,000,000
7
Pembangunan Kantor POS Lahewa
K
F
Kab. Nias
1
Pkt
430,000,000
8
Pembangunan Kantor POS Sirombu
K
F
Kab. Nias
1
Pkt
430,000,000
9
Pengadaan Peralatan Operasional Kantor Pos
K
F
Kab. Nias
1
Pkt
150,000,000
K
F
Kab. Nias
2
unit
1,200,000,000
Pembangunan Gedung Metedologi dan Geofisika Pembangunan gedung Kantor BMG
Rencana (%) Keu Fisik 13 14
Realisasi Keuangan ( RP ) 15
Fisik (%) 17
% 16
1,841,309,135
1,178,500,000 96,000,000 150,000,000 144,000,000 960,000,000 181,400,000 332,500,000
1
1
Nilai Kontrak Awal 11
3,042,400,000 Kab. Nias Kab. Nias Kab. Nias Kab. Nias Kab. Nias Kab. Nias Kab. Nias
PEMBANGUNAN GEDUNG KANTOR
B
NAMA PERUSAHAAN NOMOR/TGL KONTRAK 10
748,000,000.00 31,764,582.00 26,082,000.00 41,467,953.00 768,000,000.00 57,960,100.00 168,034,500.00
63.47 33.09 17.39 28.80 80.00 31.95 50.54
2,726,677,450 638,034,800
1,054,815,000 CV.SUMBER ENERGI SPK -05/RKP-HL/BRR-SPTN/IX/2006 ; 27/09/06 CV.LAURA CONSULTANT SPK -06/RKP-TT/BRR-SPTN/IX/2006 ; 27/09/06 CV.PERCA BANGUN PERSADA SPK - 07/RKP-TT/BRR-SPTN/IX/2006, 27/09/2006 CV.DUTA MULIA PERSADA SPK - 08/RKP-TD/BRR-SPTN/IX/2006, 27/09/2006 CV.CITRA MANDIRI CONSULTAN SPK - 01/R-KP/BRR-SPTN/V/2006 6/5/2006
33,600,000
25
34,000,000
25
34,300,000
70
CV.IRBIE NUSA CONSULTANT SPK - 04/S-KP/BRR-SPTN/VI/2006, 12/06/2006
49,850,000
CV. OLORA INDAH SPP-11/PLH-2/BRR-SPTN/VI/2006, CV. SAMIGOR SPP-06/PSR-1/BRR-SPTN/VI/2006,
70
33,725,000
43,250,000
43,250,000
100 100
100
22/06/06
425,000,000
25
306,000,000
72 100
12/06/06
401,090,000
25
288,784,800
72 80
1,080,000,000
25
1,080,000,000
1,032,209,000
25
738,472,650
2,520,000,000
2,182,109,000 PT. GANDA RIMA SARI SPP05/BMG-1/BRR-SPTN/VI/2006, 10/06/06 CV.TITIAN BARU & CV. ARISANDI GROUP SPP-03/RD-70/MG/BRR-SPTN/VI/2006, 1/06/06 SPP-04/RD-50/MG/BRR-SPTN/VI/2006, 1/06/2006
1,818,472,650 100 100 90.00 72
2
Pembangunan rumah Dinas BMG T.70
K
F
Kab. Nias
2
unit
3
Pembangunan rumah Dinas BMG T.50
K
F
Kab. Nias
6
unit
4
Perencanaan fasilitas dan jalan masuk BMG
K
N
Kab. Nias
1
Pkt
110,000,000
5
Pembangunan Ruang Gas dan Rumah Balon BMG
K
F
Kab. Nias
1
Pkt
130,000,000
60
6
Pengawasan Pembangunan Ruang Gas dan Rumah Balon BMG
K
N
Kab. Nias
1
Pkt
40,000,000
50
Pengadaan Sarana dan Prasarana Transportasi Nias
C
1,040,000,000
CV.OKTAMA CONSULTANT
69,900,000
5,810,000,000
1
Perencanaan Pembangunan Terminal Bus di Teluk Dalam
K
N
Kab. Nias
1
Pkt
200,000,000
2
Perencanaan Pembangunan Terminal Bus di Lahewa
K
N
Kab. Nias
1
Pkt
200,000,000
3
Perencanaan Pembangunan Terminal Bus di Sirombu
K
N
Kab. Nias
1
Pkt
200,000,000
30
5,063,501,000
PT. FARA MUTIARA
4
Rehab Terminal Bus Gunungsitoli
K
F
Kab. Nias
1
Pkt
2,500,000,000
17/TBG-2/BRR-SPTN/VII/2006, PT. DARA RIZKY
5
Rehab Terminal Bus Damri - Luaha
K
F
Kab. Nias
1
Pkt
2,200,000,000
18/TBL-2/BRR-SPTN/VII/2006,
270,170,000
SPP-
12/07/06 SPP-
2,423,126,000
23
12/07/06
2,134,683,000
23
Ket. 18
No
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
1
2
3
4
5
6
7
8
9
K
N
1
Pkt
6 7
Perencanaan Terminal Bus Gunungsitoli dan Bus Damri Luaha Pengawasan Pembangunan Terminal Bus
K
N
Kab. Nias Kab. Nias
1
Pkt
III PEMBANGUNAN / PENINGKATAN LANDASAN Rehab dan Rekon Transportasi Udara
A
275,000,000 235,000,000
NAMA PERUSAHAAN NOMOR/TGL KONTRAK 10 CV. GAMMA'91 CONSULTANT
SPP-02/R-TB/BRR-SPTN/V/2006,
18/05/06
CV. HARAWANA CONSULTANT
5,620,284,040
PT. HARAN'S PRIMA JAYA KARYA 1
Pkt
6,774,132,000
2
Perpanjangan Bandara Lasondri
K
F
Kab. Nias
1
Pkt
3,300,000,000
1
Pkt
23 5,620,284,040
Kab. Nias
Kab. Nias
234,982,000
700,000,000
Fisik (%) 17
% 16
270,170,000
13,116,743,500
F
N
100
12,656,132,000
K
K
270,710,000
Realisasi Keuangan ( RP ) 15
13,116,743,500
Perpanjangan Runway Binaka
Perencanaan Fasilitas sisi darat Bandara Binaka
Rencana (%) Keu Fisik 13 14
12,656,132,000
1
3
Nilai Kontrak Awal 11
100 100
27.88
SPP-
07/BNK-1/BRR-SPTN/VI/2006, 12/06/06 PT. KARYA UTAMA SAKTI SPP-
6,577,145,000
23
1,973,143,500
30 24
08/LSD-1/BRR-SPTN/VI/2006, 12/06/06
3,290,104,000
23
2,500,479,040
76 90
698,985,000
23
349,492,500
50 85
418,962,500
23
331,395,500
79 90
23
350,230,000
50 85
115,543,500
50 80
PT. TRIDAYA PAMURTYA SPP09/RTT/BRR-SPTN/VI/2006, 22/06/06 PT. VINI VENTURA CONSULTANT
4
Pengawasan Pembangunan Bandara
K
N
Kab. Nias
1
Pkt
420,000,000
SPP-02/S-BNK/BRR-SPTN/VI/2006,
24/06/06
PT. TRIDAYA PAMURTYA SPP-15/MPB/BRR-SPTN/VI/2006, 26/06/06 5
Studi rencana induk pembangunan bandar udara Nias Selatan
K
F
Kab. Nias
1
Pkt
700,500,000
700,460,000
6
Studi AMDAL Bandara Binaka dan Pelabuhan Laut G.Sitoli
K
N
Kab. Nias
1
Pkt
500,000,000
1,200,000,000
7
Pembangunan rumah dinas T.50 Bandara Binaka (2 unit)
K
F
Kab. Nias
2
Pkt
236,500,000
CV.MAJU ELECTRIC
231,087,000
& ENGINERING
8
Pengawasan Pembangunan rumah dinas Bandara Binaka
K
N
Kab. Nias
1
Pkt
IV PEMBANGUNAN FASILITAS OPERASIONAL PELABUHAN Rehab dan Rekon Pelabuhan Laut Nias
A
1
Pembangunan Pelabuhan Lahewa I
K
F
Kab. Nias
3
Pelapisan Runway-Taxiway dan Apron dgn Hotmix tebal rata-rata 5cm termasuk marking tahap I di Bandara Binaka-Gunungsitoli (lanjutan) Pelapisan Runway-Taxiway dan Apron dgn kolakan tebal rata-rata 5cm termasuk marking tahap I di Bandara Lasondre-Nias selatan (lanjutan)
4
Pembangunan Gedung Power House seluas 100 m2 di Bandara BinakaGunungsitoli
K
F
5
Pengawasan pekerjaan pembangunan di bandara udara Binaka - Gunungsitoli (lanjutan)
K
6
Pengawasan Pekerjaan Pelapisan Runway, Taxiway dan Apron di Bandar Udara Lasondri Nias Selatan
K
7
Pembangunan Dermaga darurat dan Reklamasi di Gunungsitoli
K
F
Kab. Nias
8
Pengawasan Pembangunan Dermaga daruraat dan reklaasi di Gunungsitoli
K
N
9
Pembangunan Pelabuhan Teluk Dalam Tahap I
2
10 Pembangunan Rumah DinasT.70 Shahbandar Pelabuhan Pulau Tello
K
F
K
F
Kab. Nias Kab. Nias Selatan
1
Pkt
25,000,000
19,160,000,000
17,803,164,000
11,284,723,050
19,160,000,000
17,803,164,000
11,284,723,050
4,085,052,000
2,451,030,800
4,612,500,000
1
Pkt
2,920,000,000
1
Pkt
386,000,000
Kab. Nias
1
Pkt
67,500,000
F
Kab. Nias
1
Pkt
49,000,000
F
Kab. Nias selatan
1
Pkt
25,000,000
1
Pkt
775,000,000
1
Pkt
15,000,000
1
Pkt
6,309,400,000
1
Pkt
250,000,000
K
F
Kab. Nias Kab. Nias selatan
K
F
Kab. Nias selatan
PT. BUDI GRAHA PERKASA UTAMA SPP19/LLH-3/BRR-SPTN/VIII/2006, 05/08/06 PT. SIGE SINAR GEMILANG SPP-03/BRR-UN/2006, 05/01/06 I : 01/03/06 PT. JAMAL PUTRA SPP-06/BRR-UN/I/2006, 11/01/06
SPP-02/R-TB/BRR-SPTN/V/2006,
K
F
Kab. Nias
1
Pkt
200,000,000
12 Pengawasan Pembangunan Pelabuhan
K
F
Kab. Nias
1
Pkt
750,000,000
13 Pembangunan rumah dinas T.70 Adpel Gunungsitoli
1
Pkt
165,600,000
14 Pengawasan Pembangunan rumah dinas T.70 Adpel Gunungsitoli
1
Pkt
25,000,000
1
Pkt
2,500,000,000
18/05/06
CV. CAIL UTAMA SPK04/S-KP/BRR-SPTN/V/2006 15/05/06 CV. CAHAYA BARU SPP03/GS/BRR-LN/III/2006, 04/03/06 CV.ARANGSIBU RAYA CONSULTANT SPK-04/KGS/BRR-SPTN/III/2006, 04/03/06 PT.BINATAMA SEJAHTERA SPP-020/LTD-3/BRR-SPTN/VIII/2006 09/08/06 SPP-10/RD-70/SY/BRRSPTN/VI/2006
CV. MURNI PEMBANGUNAN SPP-12/RD70/SR/BRR-SPTN/VI/2006, 22/06/06 PT.VINI VENTURA CONSULT. SPP21/SPL/BRR-SPTN/VIII/2006 CV.KITA SPTN/X/2006,11/10/2006
63.39
60.00
59.05
ADD
CV.GADING MAS SPP-02/BRR-UN/I/2006 05/1/06 ADD I : 09/03/06 PT. GAMMA'91 CONSULTANT
CV. MEMORI
11 Pembangunan Rumah Dinas T.70 Shhbandar Pelabuhan Sirombu
15 Perkuatan dermaga Gunungsitoli
50
2,915,723,000
100
2,571,190,000
88
100
384,830,000
100
307,864,600
100
100
66,070,000
100
66,070,000
100
100
48,750,000
48,750,000
100
100
24,750,000
24,750,000
100
100
655,172,000
655,172,450
100
100
14,610,000
14,610,000
100
100
5,849,470,000
3,275,983,200
56
59.01
242,157,000
242,157,000
100
100
189,927,000
94,963,500
50
80
748,770,000
28
431,915,000
58
70
154,533,000
77,266,500
50
SPP-27/RD-ADP/BRR80 70
PT. SUMATERA INDAH INDONESIA 23/PGS-4/BRR-SPTN/IX/2006,14/09/2006
SPP2,325,000,000
1,023,000,000
44
45
Ket. 18
No
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
1
2
3
4
5
6
7
8
9
1
Pkt
16 Pengawasan pekerjaan perkuatan dermaga Gunungsitoli
360,000,000
V PENGADAAN ALAT STUDIO DAN KOMUNIKASI Pengadaan Roda -2
A
K
F
Kab. Nias
2
unit
30,000,000
Pengadaan Pemasangan Peralatan Metedologi dan Geofisika Telekomunikasi
B
PT. PUTRA EXOS SPK-10/BRR-SPTN/VII/2006
Nilai Kontrak Awal 11
Rencana (%) Keu Fisik 13 14
Realisasi Keuangan ( RP ) 15
Fisik (%) 17
% 16
98,350,000
50
292,988,000
292,988,000
28.73
29,868,000
29,868,000
100
100
133,540,000
100
100
129,580,000
100
90
330,000,000
1
Perencanaan Pembangunan Fasilitas Meterologi dan Geofisika
K
N
Kab. Nias
1
pkt
135,000,000
2
Pengawasan Pembangunan Fasilitas Meterologi dan Geofisika
K
N
Kab. Nias
1
pkt
195,000,000
CV. CITRA MANDIRI CONSULTAN SPP-01/RMG/BRR-SPTN/IV/2006, 06/04/2006 CV. KONTAK KONSULTANT SPP14/SMG/BRR-SPTN/2006, 24/06/06
200,000,000
VI PENGADAAN KEND. BERMOTOR RODA-4 / RODA-6 / RODA-10 A
110,000,000
NAMA PERUSAHAAN NOMOR/TGL KONTRAK 10 CV.RANCANG BANGUN CONSULTAN SPP-22/S-PG/BRR-SPTN/IX/2006,11/09/2006
133,540,000
100
129,580,000
43
197,450,000
197,450,000
Pengadaan Sarana dan Prasarana Transportasi Nias Pengadaan mobil Comando car Bandar Udara Binaka
K
TOTAL Jumlah Paket Kontrak Jumlah Paket Swakelola Jumlah Paket Fisik Jumlah Paket Non Fisik Keterangan : (K / S) : K = Kontrak, S = Swakelola (F / N) : F = Fisik, N = Non Fisik (K / L / P ) : K = Terkontrak (Paket Pekerjaan Yang Sudah Diberikan SPK) (K / L / P) : L = Proses Lelang (Paket Yang Sudah Melakukan Pelelangan) (K / L / P) : P = Persiapan (Paket Yang Belum Melakukan Pengumuman Pelelangan
F
Kab. Nias
1
unit
200,000,000 45,053,532,000
CV.KITA 28/MO-CO/BRR-SPTN/XI/2006,16/10/2006
SPP-
197,450,000 39,710,770,500
197,450,000 21,963,431,675
%REALISASI thdp DIPA 49 G.Sitoli, 23 November 2006
Ir. Poltak Gordon, MSc
100 41.44
55.49
Ket. 18
LAPORAN PELAKSANAAN KEGIATAN SATKER ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN 2006 (DANA HASIL MORATORIUM) Deputi Bidang Sub Bidang SATKER Ka SatKer
Format OC1
: Bidang Pemberdayaan Ekonomi dan Usaha : Pemberdayaan Ekonomi dan Usaha Nias : 459435 : Ir. IMMANUEL ZEGA
`
PROYEK / BAGIAN PROYEK KEGIATAN PAKET No
Status Bulan : 25 Nopember 2006
NAMA PERUSAHAAN K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
Rencana (%)
Nilai Kontrak NOMOR/TGL KONTRAK
1
2
3
4
5
6
7
1
ADMINISTRASI UMUM - Administrasi Proyek - Pengadaan Alat Pengolahan Data
K
F
1
- Pengadaan Inventaris Kantor
K
F
1
8
9
Pkt
1,397,600,000 1,309,600,000 58,000,000
K
Pkt
30,000,000
K
10
CV.Buku Dua Dua Nomor : S24/BRR-459435/SPP/V/2006 30 Mei 2006 CV.Butar-Butar Brothers
Keu 12
11
Fisik 13
Fisik
Realisasi Keuangan ( RP ) 14
Ket. (%)
% 15
85,500,000 57,000,000
1,003,249,939 857,749,939 57,000,000
28,500,000
28,500,000
16 1,173 100
40 100
100
100
Nomor : S-25 /BRR.459435/SPK/ V/2006 tgl 27 Mei 2006 CV.Pelita Jaya Nomor :
Pembayaran sewa Kendaraan Roda 4
60,000,000
161/BRR.459435/SPK/I 6 2
3
Penyelenggaraan Pembinaan Industri Rumah Tangga , Industri dan Industri Menengah 1. Pengembangan Uasaha Ekonomi - Bantuan Modal Kerja Industri Rumah Tangga - Bantuan Modal Usaha Industri Rumah Tangga
S S
N N
K
120,000,000
RT RT
400,000,000 400,000,000 200,000,000 200,000,000
400,000,000 400,000,000 200,000,000 200,000,000
400,000,000 400,000,000 200,000,000 200,000,000
1
Pkt
9,545,000,000 1,762,000,000 102,000,000
4,096,125,000 1,056,325,000 56,400,000
3,096,200,000 56,400,000 56,400,000
1 1 1
Pkt Pkt Pkt
600,000,000 60,000,000 1,000,000,000
100 100
Penyelenggaraan Bimbingan Perkoperasian dan Usaha Kecil 1. Pendidikan dan Pelatihan Masyarakat - Identifikasi dan Seleksi LKM Nias - Pelatihan dan Pendampingan UKM - Pelatihan Pengelola dan Pengurus LKM - Studi Pengembangan Ekonomi Nias
bln
N
V/2006 tgl 1 Mei 2006
K
Lembaga Demografi FE UI Nomor : 212/BRR.459435/PPKKOP/VI/2006 TGL 27 JUNI 2006
60,000,000
100 100 100 76 5 100
999,925,000
40
2. Pengembangan Koperasi dan Pengusaha Kecil - Bantuan Perlengkapan Kantor LKM - Design Pasar Yaahowu Gunungsitoli - Kendaraan Roda 2
- Bantuan Modal LKM - Bantuan Pengolahan Hasil Perikanan - Bantuan Peralatan Pengolahan Kelapa - Bantuan Peralatan Pengolahan Biji Kakao - Bantuan Peralatan Pembuatan Kue - Bantuan Peralatan Pengolah Hasil Tanaman Pangan dan Hortikultura - Pengadaan Gerobak Dagang Sorong - Bantuan Peralatan Usaha/Pendukung Industri Rumah Tangga Lainnya
Pkt Pkt Unt
7,783,000,000 217,000,000 556,000,000 40,000,000
P P K
7 1 1 1 1
Unt Pkt Pkt Pkt Pkt
3,500,000,000 500,000,000 700,000,000 950,000,000 150,000,000
P P P P
F F
1 37
Pkt Unit
600,000,000 222,000,000
P P
K
F
1
Pkt
348,000,000
P
K
N
1
Pkt
50,000,000 50,000,000
P
S K K
F N F
7 1
S K K K K
N F F F F
K K
2
3,039,800,000
CV. GADING ASIA MAS NOMOR : 364/BRR-459435/SPK/IX/2006 TGL 6 SEPTEMBER 2006
39,800,000
100
3,000,000,000
100
100
3,039,800,000
100
39,800,000
100
3,000,000,000
100
Pengembangan Pemanfaatan Wisata Alam 4 - Rehabilitasi Bangunan Wisata
-
100
-
17
PROYEK / BAGIAN PROYEK KEGIATAN PAKET No
NAMA PERUSAHAAN K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
Nilai Kontrak NOMOR/TGL KONTRAK
5
Rehabilitasi Hutan dan Lahan ( RHL )
1,345,000,000
Rencana (%) Keu
596,000,000
Fisik
Fisik
Realisasi Keuangan ( RP ) 178,800,000
Ket. %
(%)
PROYEK / BAGIAN PROYEK KEGIATAN PAKET No
NAMA PERUSAHAAN K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
Rencana (%)
Nilai Kontrak NOMOR/TGL KONTRAK
Keu
Fisik
Fisik
Realisasi Keuangan ( RP )
Ket. (%)
%
1. Penyelenggaraan Rehabilitasi Kawasan Hutan 172,500,000 - Penataan Akses Hutan Megoto Berorientasi Rehabilitasi dan Konservasi 2. Penyelenggaraan Rehabilitasi Kawasan Pantai - Pengadaan Bibit untuk Rehabilitasi Pantai - Pengadaan Bibit untuk Rehabilitasi Pantai - Penanaman Tanaman Pola Padat Karya - Penanaman Tanaman Pola Padat Karya - Pelatihan Teknis Budidaya Tanaman Pantai / Home Garden
6
S
N
1
Pkt
172,500,000
K K S S
F F F F
12000 18000 20 30
Btg Btg Ha Ha
572,500,000 78,000,000 117,000,000 107,000,000 160,500,000
S
N
2
Pkt
110,000,000
K
F
1
Pkt
600,000,000 300,000,000
K
PT. PLARENCO; No. S271/BRR.459435/VI/2006 tanggal 30 Juni 2006
- Transplantasi Terumbu Karang
K
F
1
Pkt
300,000,000
K
PT. PLARENCO; No. S271.a/BRR.459435/VI/2006 tanggal 30 Juni 2006
Kab Kab OH Set
1,341,000,000 666,000,000 20,000,000 16,000,000 30,000,000 600,000,000
S S S K
N N N F
2 2 120 6
2. Penguatan Modal Usaha Kelompok
-
-
-
P P
3. Pendayagunaan Sumberdaya Pesisir - Transplantasi Terumbu Karang
Penelitian dan Pengembangan Bahan Galian 1. Pengembangan Usaha Ekonomi - ATK,Bahan Komputer - Penggandaan , dokumen dan Pelaporan - Pembinaan,Monitoring dan Evaluasi - Bantuan Peralatan Kerja Kelompok Tambang
-
596,000,000 298,000,000
100
100
178,800,000 89,400,000
30 30
50
298,000,000
100
100
89,400,000
30
50
5,000,000 5,000,000 5,000,000
100 100 100
5,000,000 5,000,000 5,000,000
P
675,000,000
-
-
- Bantuan Modal Kerja Kelompok Penambangan Rakyat S
7
9
18
Klp
675,000,000
1,207,740,000
Pelatihan Keterampilan Tenaga Kerja - Pelatihan Jahit Menjahit S S S S
N N N N
2 3 3 2
Akt Akt Akt Akt
286,506,000 241,959,000 267,867,000 176,732,000
- Pelatihan Pembuatan Ragam Kue
S S
N N
1 1
Akt Akt
106,215,000 128,461,000
Peningk.Prod,Produktivitas dan Mutu Prod.Perkebunan - Pendampingan Lapangan ( 2 Org x 9 Bln ) - Penyuluh Pertanian Lapangan - Intensifikasi Tananam Karet - Pembangunan Kebun Entris Karet - Eksplotasi Kendaraan Roda 2 - Intensifikasi Tananam Kakao - Penguatan Kelembagaan Petani - Pelatihan Petani - Pengendalian OPT Melalui SLPHT - Pengadaan Roda 2
S S S S S S S S S K
N N F N N F N N N F
18 16 440 1 2 400 2 50 2
OB OB Ha Ha Unt Ha Klp Org Pkt Unt
2,501,550,000 51,200,000 6,400,000 1,122,000,000 129,750,000 1,600,000 948,100,000 50,000,000 62,500,000 100,000,000 30,000,000
- Pelatihan Instalasi Listrik - Pelatihan Pembuatan Batako dan Pemasangan - Pelatihan Coolling system - Pelatihan Tukang Kayu dan Meublair
8
N
Pembangunan Pasar / Waserda
2
2,602,200,000
CV.Mitra Bina Kasih; No. 437/BRR.459435/X/2006 tanggal 20 Okt 2006
CV.Delta Utama; No. 439/BRR.459435/X/2006 tanggal 21 Okt 2006
K
CV. GADING ASIA MAS NOMOR : 365/BRR-459435/SPK/IX/2006 TGL 6 SEPTEMBER 2006
128,739,000
128,739,000
100
48,004,000 32,150,000
48,004,000 32,150,000
100 100
48,585,000
48,585,000
100
29,500,000
54,700,000 25,200,000
100 100
29,500,000
1,695,360,000
100
100
29,500,000
100
495,408,000
29
100
PROYEK / BAGIAN PROYEK KEGIATAN PAKET No
NAMA PERUSAHAAN K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
Nilai Kontrak NOMOR/TGL KONTRAK
- Identifikasi dan Seleksi Usaha yg dpt pulih dan Pedagang Eceran Kecil - Pembangunan Pasar Tradisional
S
N
44
Unt
2,200,000 1,200,000,000
Rencana (%) Keu
1,009,770,000
Fisik
Fisik
Realisasi Keuangan ( RP )
375,858,000
Ket. (%)
%
37
PROYEK / BAGIAN PROYEK KEGIATAN PAKET No
NAMA PERUSAHAAN K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
Rencana (%)
Nilai Kontrak NOMOR/TGL KONTRAK
1. Pembangunan Pasar Tradisional Tuhemberua
K
F
Tuhemberu a
1
Unt
300,000,000
K
2. Pembangunan Pasar Tradisional Mandrehe
K
F
Mandrehe
1
Unt
300,000,000
K
3. Pembangunan Pasar Tradisional Hiliduho
K
F
Hiliduho
1
Unt
300,000,000
K
4. Pembangunan Pasar Tradisional Lahusa
K
F
Lahusa
1
Unt
300,000,000
K
- Pembangunan Pasar Penunjang Supervisi Pasar Penunjang
UD. Alfandi No : 270/BRR.459435/SPP/VII/2006 Tgl 10 Juli 2006 CV. Ayu No : 268/BRR.459435/SPP/VII/2006 Tgl 10 Juli 2006
2. Pembangunan Pasar Penunjang di Desa Amuri Kec. Lolowau Kab Nias Selatan
K
F
Lolowau
90,000,000
K
3. Pembangunan Pasar Penunjang di Desa Hilidundra Kec. Lotu Kab. Nias
K
F
Lotu
90,000,000
K
4. Pembangunan Pasar Penunjang di Desa Lasarafaga Kec. Mandrehe Barat Kab. Nias
K
F
Mandrehe Barat
90,000,000
K
5. Pembangunan Pasar Penunjang di Desa Lahusa Idanotae Kec. Gomo Kab. Nias
K
F
Gomo
90,000,000
K
6. Pembangunan Pasar Penunjang di Desa Lasara Sawo Kec. Gunungsitoli Utara Kab. Nias
K
F
Gunungsit oli Utara
90,000,000
K
7. Pembangunan Pasar Penunjang di Desa Hiliwaele II Kec. Botomuzoi Kab. Nias
K
F
Botomuzoi
90,000,000
K
8. Pembangunan Pasar Penunjang di Desa Duria Kec. Lolofitu Moi Kab. Nias
K
F
Lolofitu Moi
90,000,000
K
- Bantuan Modal Bergulir Bagi Usaha Kecil / Pedagang
K
F
600,000,000 920,000,000 147,000,000 173,000,000
685,590,000 31,750,000
119,550,000
89,750,000
89,639,000
83,050,000
89,728,000
76,572,000
80,072,000
120,000,000
38,500,000
38,500,000
100
Klp
270,000,000 270,000,000
600,000,000
-
6,045,000,000
3. Pengembangan Prasarana Perikanan - Perencanaan PPI 2
100
Akt
Pkt
N
50
1 100
3
K
118,800,000
38,500,000 38,500,000
N
15
237,600,000
5,631,303,372 38,500,000
S
N
100
9,885,000,000 120,000,000
Org Pkt
S
30
100 100
7 1
3
76,140,000
40,551,000 40,551,000
N N
N
253,800,000
40,551,000 40,551,000
S S
S
70
87,200,000
K
Unt
30
CV. Idapola, No.473/BRR.459435/SPP/XI/20 06 tgl. 18 Nop 2006 CV. Yoga Jaya Perkasa, No.466/BRR.459435/SPP/XI/20 06 tgl. 18 Nop 2006 CV. Taruna Permai Jaya, No.472/BRR.459435/SPP/XI/20 06 tgl. 18 Nop 2006 CV. Avora, No.468/BRR.459435/SPP/XI/20 06 tgl. 18 Nop 2006 CV. Milenium, No.467/BRR.459435/SPP/XI/20 06 tgl. 18 Nop 2006 CV. Taruna, No.471/BRR.459435/SPP/XI/20 06 tgl. 18 Nop 2006
90,000,000
30
79,290,000
89,579,000
Teluk Dalam
2. Bantuan Usaha Ekonomi Produktif - Bantuan Modal Bagi Kelompok Nelayan
264,300,000
Ket. (%)
%
100
CV. Kasih Sri, No.468/BRR.459435/SPP/XI/20 06 tgl. 18 Nop 2006 CV. Catur Putra Agung Perkasa, No.469/BRR.459435/SPP/XI/20 06 tgl. 18 Nop 2006
F
Fisik
40
CV. Duta Mulia Persada, No : 465/BRR.459435/XI/2006 tgl 15 Nopember 2006
K
11 Pengembangan Sumber Daya Kelautan dan Perikanan 1. Pendidikan dan Pelatihan Masyarakat - Pelatihan Penanganan Ikan dan Pengenalan terhadap Bahan Pengawet
254,070,000
K
1. Pembangunan Pasar Penunjang di Desa Siwalawa Kec. Teluk Dalam Kab. Nias Selatan
10 Monitoring dan Evaluasi - Pendidikan dan Pelatihan Amdal - Sosialisasi Kualitas Lingkungan dan Bahaya Tsunami - Studi Pengembangan Komoditi Unggulan Daerah Berbasis Nilai Ekonomi dan Pengendalian Lingkungan
CV. Amena No : 269/BRR.459435/SPP/VII/2006 Tgl 10 Juli 2006 CV. Yoga Jaya Perkasa No : 366/BRR-459435/SPP/IX/2006 Tanggal 07 Sept 2006
( RP ) 101,628,000
800,000,000
Keu
Fisik
Realisasi Keuangan
Pkt
260,000,000
5,592,803,372 CV. Hawaris, No. 371/BRR.459435/SPP/IX/2006 tgl. 11 Sept 2006 CV. Hawaris, No. 421/BRR.459435/SPP/X/2006 tgl. 11 Okt 2006
128,000,000
128,000,000
-
-
-
PROYEK / BAGIAN PROYEK KEGIATAN PAKET No
NAMA PERUSAHAAN K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
Rencana (%)
Nilai Kontrak NOMOR/TGL KONTRAK
- Pengawasan Pembangunan PPI
Keu
Fisik
Fisik
Realisasi Keuangan ( RP )
Ket. (%)
%
CV. Jasa Persada Konsultan, No. 427/BRR.459435/SPP/X/2006,
- Pembangunan Dermaga PPI Luaha Kalinou G.Sitoli - Pembangunan Gedung tempat Pelelangan Ikan - Pembangunan Docking Kapal Nelayan - Pembangunan Rumah Dinas tipe 36 - Pembangunan Pagar Keliling PPI Kuala Kalinou 4. Pengembangan Sarana Perikanan - Pengadaan Peralatan Penyimpan Ikan Fiber -Pengadaan Alat Komunikasi HT Bagi Nelayan -Pengadaan Aki Batteray Boat -Pengadaan Peralatan Echo Sounder / GPS Satelit - Pengadaan Alat Pengering Ikan - Pengadaan Alat Penyimpan/Pembeku (Freezer) - Pengadaan Alat Tangkap Jaring Layang
K
N
2
Pkt
185,000,000
K K K K K
F F F F F
1 1 1 2 1
Unt Unt Unt Unt Pkt
4,000,000,000 800,000,000 400,000,000 100,000,000 300,000,000
Buah Buah Pkt Unt Unt Pkt Unit
3,450,000,000 101,500,000 640,000,000 112,500,000 750,000,000 550,000,000 800,000,000 496,000,000
K K K K K K K
F F F F F F F
203 80 50 50 50 20 124
L L L
tgl 14 Okt 2006 CV. Sumatera Consulting Engineering, No. 428/BRR.459435/SPP/X/2006, tgl 14 Okt 2006 PT.Mitra Enginering Group CV. Dua Ribu Cv. Kumpulan jaya
L
CV. Sahabat Sukses Mandiri
90,500,000
91,000,000 3,757,414,658 749,550,000 364,781,000 283,557,714 -
-
48.21
-
13.92
-
P P P P P P P
Peningk.Prod,Produktivitas dan Mutu Prod.Tanaman Pangan 12 1. Pengembangan Usaha Tani - Penyuluh Pendampingan Kegiatan ( 2 Org x 9 Bln ) - Honor Penyuluh Pertanian Lapangan - Penggandaan , Dokumentasi dan Pelaporan - Alat Tulis Kantor dan Bahan Komputer - Penumbuhan/Pemberdayaan Kelompok Tani - Penyusunan dan Cetak Leaflet Teknologi Komoditi Padi - Penanggulangan OPT ( SL-PHT ) - Perjalanan Pendampingan Lapangan - Pengadaan Hand Traktor Bajak Singkal - Hand Sprayer - Bantuan Material dan Rehab/Pembangunan Saluran Air Pola Padat Karya - Bantuan Sarana Produksi Padi Pola BLM - Bantuan Kontribusi Biaya Pelatihan 2. Optimalisasi Pemanfaatan Lahan - Penyuluhan Pendampingan Lapangan ;- Honor Penyuluh Pertanian Lapangan - Penggandaan , Dokumentasi dan Pelaporan - Alat Tulis Kantor dan Bahan Komputer - Penumbuhan/Pemberdayaan Kelompok Tani - Pertemuan Sosialisasi Program di Tingkat Kabupaten - Pengendalian OPT ( SL-PHT ) - Penyusunan dan Cetak Leaflet - Perjalanan Petugas Penyuluh Ke Kabupaten - Bantuan Sarana Produksi Jagung Pola BPLM - Bantuan Sarana Produksi Sayur-Sayuran Pola BPLM - Bantuan Kontribusi Biaya Pelatihan 13 Pengembangan Agribisnis Peternakan - Pemberantasan Penyakit Menular Hewan dan Unggas - Pembinaan Petani - Pengadaan Obat obatan / Vaksin Untuk Pos Keswan - Rehabilitasi / Pembangunan RPH 1. Perencanaan RPH
S S S S S S S S K K
N N N N N F N N F F
16 16 1 12 10 1000 10 115 42 204
OB OB Pkt Bln Klp Lbr Klp OH Unt Unt
3,990,400,000 2,327,600,000 51,200,000 6,400,000 24,000,000 12,000,000 10,000,000 7,500,000 50,000,000 11,500,000 924,000,000 51,000,000
S S S
F F N
500 500 2
Ha Ha Org
375,000,000 800,000,000 5,000,000
S S S S S S
N N N N N N
8 8 1 1 10 2
OB OB Pkt Pkt Klp Kl
1,662,800,000 25,600,000 3,200,000 24,000,000 24,000,000 10,000,000 950,000
S S S S
N F N F
S
N
10 1500 88 250 60 1
Klp Lbr OH Ha Ha Pkt
50,000,000 11,250,000 8,800,000 1,000,000,000 450,000,000 55,000,000
S S K K
N N F F
2 4 2 1
Pkt Klp Pkt Unt
1,170,000,000 50,000,000 20,000,000 50,000,000 350,000,000
26,225,000 14,500,000
64,025,000 39,700,000 25,200,000
244 274 100
6,000,000 1,000,000
6,000,000 1,000,000
100 100
7,500,000
7,500,000
100
11,725,000
24,325,000 12,600,000
100
P P
-
475,000
100
11,250,000
11,250,000
100 -
400,000,000
400,000,000
100
P CV. Duta Mulia Persada, No :
F
1
Unt
tgl. 14 September 2006
-
475,000
379/BRR.459435/SPP/IX/2006 K
100
41,700,000
100
PROYEK / BAGIAN PROYEK KEGIATAN PAKET No
NAMA PERUSAHAAN K/S
F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
Nilai Kontrak NOMOR/TGL KONTRAK
Rencana (%) Keu
Fisik
Fisik
Realisasi Keuangan ( RP )
Ket. (%)
%
CV. Duta Mulia Persada, No : 494/BRR.459435/SPP/XI/2006 2. Supervisi RPH 3. BPLM Ternak Babi
K
F
1
Unt
S
F
4
Klp
tgl. 24 Nopember 2006 Kelompok Tani Damai, No :
11,800,000
SPK-463/BRR.459435/XI/2006, 400,000,000
4. BPLM Ternak Ayam
Tgl 6 Nop 2006 Kelompok Tani Semangat Baru,
100,000,000
100,000,000
100
50,000,000
50,000,000
100
50,000,000
50,000,000
100
50,000,000
50,000,000
100
50,000,000
50,000,000
100
50,000,000
50,000,000
50,000,000 13,134,303,372
50,000,000 5,905,172,939
No : SPK467/BRR.459435/XI/2006, S
F
6
Klp
300,000,000
Tgl 6 Nop 2006 Kelompok Tani Membawa Berkah, No : SPK466/BRR.459435/XI/2006, Tgl 6 Nop 2006 Kelompok Tani Sinar Harapan, No : SPK469/BRR.459435/XI/2006, Tgl 6 Nop 2006 Kelompok Tani Suka Maju, No : SPK-469/BRR.459435/XI/2006, Tgl 6 Nop 2006 Kelompok Tani Ingin Maju, No : SPK-465/BRR.459435/XI/2006, Tgl 6 Nop 2006 Kelompok Tani Ingin Maju, No : SPK-465/BRR.459435/XI/2006, Tgl 6 Nop 2006
TOTAL Jumlah Paket Kontrak Jumlah Paket Swakelola
36,355,490,000
Jumlah Paket Fisik Jumlah Paket Non Fisik Keterangan : (K / S) : K = Kontrak, S = Swakelola (F / N) : F = Fisik, N = Non Fisik (K / L / P ) : K = Terkontrak (Paket Pekerjaan Yang Sudah Diberikan SPK) (K / L / P) : L = Proses Lelang (Paket Yang Sudah Melakukan Pelelangan) (K / L / P) : P = Persiapan (Paket Yang Belum Melakukan Pengumuman Pelelangan
%Realisasi Fisik thdp DIPA
Gunungsitoli, 25 Nopember 2006 Kepala Satuan Kerja Sementara BRR-Pemberdayaan Ekonomi dan Usaha Nias
Ir. IMMANUEL ZEGA NIP. 110024634
100 16.24
27.94
10.09344349
LAPORAN PELAKSANAAN KEGIATAN SATKER ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN 2006 (DANA HASIL MORATORIUM) Deputi Bidang Sub Bidang SATKER Ka SatKer
No
: : : :
FORMAT OC-1
Bidang Agama, Sosial dan Budaya Agama, Sosial dan Budaya Nias 462262 Sorayana Zebua, S.E
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
-
Status Bulan : 20 November 2006
K/S F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
NAMA PERUSAHAAN
Nilai Kontrak Awal
Sisa Kontrak
NOMOR/TGL KONTRAK 1 I
2
3
ADMINISTRASI UMUM Administrasi Proyek
Pengadaan Alat Pengolahan Data
4
5
K
N
F
RRI Gunungsitoli dan Radio Suara Pulau Tello
Satker BRR-Agama, Sosial, dan Budaya Nias
36 36
10
Keg
Keg Keg
Unt
Perawatan Gedung Kantor - Rehab Kantor Pemberdayaan Perempuan dan KB Kab. Nias
3
K
K
F
Gunungsitoli
200
M2
% 15
KET
16
737,240,718 703,540,718
46% 66%
33,700,000
33,700,000
100%
1,360,163,800 134,495,000 9,000,000 27,995,000
1,353,663,800
100%
99%
2,500,000
28%
28%
17,005,000
K
RRI Gunung Sitoli 46/BRR-ASB/SPK/IV/2006 Tgl 15 April 2006
27,995,000
8,005,000
27,995,000
100%
70%
Proses Pelaksanaan
K
CV.Cipta Sentosa 072/BRR.462262/VI/2006 29 Juni 2006
97,500,000
22,500,000
97,500,000
100%
100%
Selesai
Selesai
200,000,000
0
1,525,490,000 K
* Pengadaan Susu Balita Keluarga Prasejahtera * Distribusi K * Pengadaan Susu U/ Ibu Hamil Keluarga Prasejahtera III REHABILITASI SOSIAL 1 Rehabilitasi Sosial - Honor Tidak Tetap - Belanja Bahan Belanja Sewa (Sewa tempat pelatihan Koselor Pastor & - Penginapan ) Belanja Jasa Lainnya (Penyelenggaraan Pelatihan Konseling - Pastoral) - Belanja perjalanan Lainnya (Transpotasi Peserta & Cadangan
Dinas Kesehatan Kabupaten Nias N dan Dinas Kesehatan Kab. Nias Selatan Dinas Kesehatan Kabupaten Nias N dan Dinas Kesehatan Kab. Nias Selatan
14,294 88
5,558
Bh KL
BH
1,072,050,000 8,800,000
444,640,000 2,635,000,000 1,635,000,000 112,400,000 36,000,000
N
200,000,000
S S S
S S
1,225,668,800
K
PT.Dwi ChindinAbadi 073/BRR.462262/VI/2006 30 Juni 2006
K
CV.Gading Asia Mas 074/BRR.462262/VI/2006 30 Juni 2006
859,117,600 8,800,000
212,932,400
859,117,600 8,800,000
100% 100%
100% 100%
Selesai Selesai
357,751,200
86,888,800
357,751,200
100%
100%
Selesai
-
-
1
Pkt
N N F F F N N
-
Lok Lok PK Bln Bln Pkt
1,068,600,000 110,000,000 221,100,000 14,240,000 622,160,000 86,100,000 15,000,000
-
23 22 1 154 7 1
-
1
Pkt
1,000,000,000 1,000,000,000
-
N
Unit Unit
21,751,311,000 15,956,174,000 13,162,500,000 556,875,000 12,474,000,000
F F
0%
79,800,000
N N
Pemberdayaan Sosial - Pendataan dan Perencanaan Pembangunan desa
IV Pembinaan dan Pemberian Bantuan Sosial 1 Bantuan Pembangunan / rehabilitasi Tempat Ibadah - Bantuan Sosial Lembaga Peribadatan * Bantuan Pembangunan Mesjid * Bantuan Pembangunan Gereja
120,000,000
11a
( RP ) 14
1,095,200,000 1,061,500,000 PT. Logikreasi Utama 06/BRR-ASB/III/2006 22 Maret 2006
1,899,490,000 174,000,000 9,000,000 45,000,000
36,000,000 9,000,000
11
Fisik 13
(%)
1,525,490,000
- Pelayanan Pengasuhan Anak Melalui Bina Keluarga Balita Terpadu
2
10
Keu 12
Fisik
Realisasi Keuangan
200,000,000
Pelayanan Kesehatan/Perbaikan Gizi Ibu / Anak & KB
- Belanja Bantuan Langsung (Block Gant) Sekolah / Lembaga / Guru * Bantuan Sewa 23 tempat Pusat Konseling Pastoral Healing * Bantuan Meubeler untuk 22 Unit PPKP * Bantuan Meubeler Induk PPKP * Bantuan Operasional PPKP ( 22 Unit x 7 Bln ) * Bantuan Operasioanal Induk PPKP * Bantuan Sewa satu tempat induk pusat konseling pastora
9
35,000,000
36
K
8 1,230,200,000 1,195,200,000
N
* Biaya Siaran Radio ( 4 Kl x 9 Bln ) * Pengelola Program
2
7
N
II Pembinaan Keluarga Berencana 1 Penyuluhan dan Penyebaran Informasi - Siaran Radio Penyuluhan GKBN (Honor Nara Sumber) - Siaran Radio Penyuluhan GKBN
Pengadaan Sound System Portable untuk Penyuluhan KB - (Kabupaten & Kecamatan)
6
Rencana (%)
Nias dan Nias Selatan Nias dan Nias Selatan
15 336
228,200,000 110,000,000
15,987,882,000 13,162,500,000 13,162,500,000 556,875,000 12,474,000,000
13,606,636,200
85%
83%
556,875,000 10,729,125,000
100% 86%
100% 84%
Selesai Proses Pelaksanaan
No
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
K/S F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
NAMA PERUSAHAAN
Nilai Kontrak Awal
Sisa Kontrak
NOMOR/TGL KONTRAK * Pengelola Program Pembangunan Mesjid * Pengelola Program Pembangunan Gereja - Anggaran Belanja Tambahan * Bantuan Pembangunan Mesjid ( Lanjutan Dipa Luncuran) * Bantuan Pembangunan Gereja ( Lanjutan Dipa Luncuran) * Bantuan Pembangunan Vihara ( Lanjutan Dipa Luncuran) * Pengelola Program Pembangunan Mesjid (Lanjutan Dipa Luncuran) * Pengelola Program Pembangunan Gereja (Lanjutan Dipa Luncuran) * Pengelola Program Pembangunan Vihara (Lanjutan Dipa Luncuran) 2
Bantuan Lembaga Sosial Lainnya - Biaya Makan Anak Panti ( 5 Lok x 75 Org x 360 Hari )
- Bantuan Pendidikan Anak Panti ( 1000 Org x 2 Kl x 1 Thn
- Bantuan Pembangunan Panti Asuhan ( 2 Unit x 450 M2 )
S S
N Nias dan Nias Selatan N Nias dan Nias Selatan
15 336
Pkt Pkt
5,625,000 126,000,000
S S S
F F F
15 133 1
Unit Pkt Pkt
2,793,674,000 278,430,000 2,468,746,000 18,562,000
S
N Nias dan Nias Selatan
15
Pkt
2,812,000
S
N Nias dan Nias Selatan
133
Pkt
24,937,000
S
N Nias dan Nias Selatan
1
Pkt
187,000
N Nias dan Nias Selatan 135,000 Nias PA. Yatim Piatu AL-Washliyah PA. Bowongahono PA. Kudus 02 BNKP PA. Kudus 03 BNKP PA. Bukit Kalvari PA. Kinderdorf/St. Antonius Bg. Bayi PA. Kinderdorf/St. Antonius PA. A'isyah Binti Abubakar PA. Iris Indo Podok Rahmat (Yayasan Eben Heazer Ministri) PA. Pondok Berkat Panti Jompo Betania BNKP PA. Pusat Rehabilitasi Anak Cacat Caritas PA. Tabita Nias Selatan PA. Anugerah Kasih PA. Debora PA. Cinta Kasih
OH
5,795,137,000 2,025,000,000
N Nias dan Nias Selatan Nias PA. Yatim Piatu AL-Washliyah PA. Bowongahono PA. Kudus 02 BNKP PA. Kudus 03 BNKP PA. Bukit Kalvari PA. Kinderdorf St. Antonius PA. A'isyah Binti Abubakar PA. Iris Indo Podok Rahmat PA. Pondok Berkat PA. Pst. Rhb. Anak Cacat Caritas PA. Tabita PA. Harapan Kasih PA. Bhakti Luhur Nias Selatan PA. Anugerah Kasih PA. Debora PA. Cinta Kasih
2,000
OH
F
1,290
S
S
S
Nias dan Nias Selatan Nias dan Nias Selatan Nias
Nias dan Nias Selatan
-
F
Nias dan Nias Selatan
5,625,000 126,000,000
Fisik
Fisik
KET
(%)
( RP ) 5,625,000 385,875,000
% 100% 306%
100% 100%
Selesai Selesai
1,012,500,000 891,000,000 72,900,000 56,700,000 137,700,000 153,900,000 64,800,000 18,900,000 105,300,000 27,000,000
50%
70%
Proses Pelaksanaan
45%
70%
Proses Pelaksanaan
-
2,825,382,000 2,025,000,000
64,800,000 21,600,000 48,600,000 37,800,000 121,500,000 45,900,000 27,000,000 48,600,000 300,000,000
300,000,000
135,750,000 114,750,000 6,750,000 5,250,000 15,150,000 15,900,000 12,900,000 9,150,000 2,250,000 15,600,000 10,200,000 8,400,000 6,000,000 7,200,000 21,000,000 9,000,000 2,400,000 9,600,000
M2
2,681,910,000
L
1,301,659,000
UD. MASA KARYA 130/BRR.462262/K-PPK/IX/2006 26 September 2006 CV. SANGSAKA 138/BRR.462262/KPPK/IX/2006 26 September 2006
1,380,251,000
b. Kudus 01 di Telukdalam K
Keu
Realisasi Keuangan
81,000,000
a. Kudus 03 Tohia Gunungsitoli
Bantuan Perlengkapan Panti Asuhan Baru ( 3 Unit )
Rencana (%)
3
Pkt
600,000,000
K
CV.Interdelta 075/BRR.462262/VI/2006 29 Juni 2006
2,212,723,000
Proses pelaksanaan
1,091,897,000
209,762,000
1,120,826,000
259,425,000
500,382,000 99,618,000
218,379,400
20%
0
Proses pelaksanaan
Proses pelaksanaan
224,165,200
20%
0
150,114,600
30%
100% Proses Pelaksanaan
No
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
K/S F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
NAMA PERUSAHAAN
Nilai Kontrak Awal
Sisa Kontrak
NOMOR/TGL KONTRAK Bantuan pembangunan Panti Asuhan Bowongahono Gunungsitoli
K
F
Nias
1
Unit
V Pengembangan Kebudayaan dan Pariwisata 1 Pembudayaan dan Pemasyarakatan Belanja Honor ( Penyelenggara Seminar Studi Kelembagaan Adat - dan Budaya) Belanja Barang ( Penyelenggara Seminar Studi Kelembagaan Adat - dan Budaya) - Pengadaan
8,640,855,000 4,116,000,000 S
N
35,000,000
S S
N N
31,000,000 980,000,000
Fisik
Realisasi Keuangan
KET
%
(%)
188,227,000
100%
100%
3,644,899,207
86%
64%
75,001,500
394,198,525
95%
100%
Selesai
137,396,875
37,603,125
130,527,032
95%
100%
Selesai
265,125,000
27,825,000
79,537,500
30%
50%
Proses pelaksanaan
75,000,000
50%
50%
Proses Pelaksanaan
Keu
PT.Hara Putra Utama 132/BRR-N/SOS/I/2006 Tgl. 23 Januari 2006
188,227,000
Rencana (%) Fisik
( RP )
Selesai 4,220,520,375 3,887,520,375
817,520,375
Nias dan Nias Selatan * Alat Kesenian Tradisional
K
F
2
Pkt
490,000,000
K
* Alat Olah Raga Tradisional Rago UE ( Takraw )
K
N Nias dan Nias Selatan
2
Pkt
490,000,000
K
CV.Mitra Niaga Pratama 076/BRR.462262/VI/2006 Tgl. 29 Juni 2006
414,998,500 402,521,875
PT.Multikarya Mandiri Lestari a. Rago Ue (sepak takraw)
175,000,000
b. Hombo Batu di Kab. Nias dan Nias Selatan
* Bantuan Penyelenggaraan Musyawarah Adat ( Fondako ) * Pemberdayaan Pengrajin Tradisional Nias
* Penyelenggaraan Festival dan Pameran Seni Budaya 2
S
N Nias
S S
N Nias dan Nias Selatan N Nias dan Nias Selatan
S
29 Juni 2006 CV SAHABAT SUKSES MANDIRI 177/BRR.462262/K-PPK/X/2006 Tgl 10 Oktober 2006
292,950,000
- Perencanaan Pembuatan Alat Olahraga Tradisional Hombo Batu - Pengawasan Pembuatan Alat Olahraga Tradisional Hombo Batu - Bantuan Pembentukan Pusat Studi Seni, Budaya dan Bahasa Nias di IKIP Gunungsitoli - Belanja Sosial Lainnya
077/BRR.462262/VI/2006
3,150,000
18,900,000
150,000,000 2,920,000,000
2
Pkt
N Nias dan Nias Selatan
600,000,000 1,320,000,000
150,000,000 2,920,000,000
K K
Surat Perjanjian No. S509/BRR,462262/VIII/2006 Tgl. 11 Agustus 2006
1,000,000,000
Perawatan Gedung Khusus - Jasa Konsultan
4,524,855,000 1,219,840,000
K
b. Pengawasan Pembangunan Gedung Kursus Wanita
K
N
1 Gunungsitoli, Sirombu, Telukdalam, PP. Batu
Pkt
80,000,000
K
CV. Duta Mulia Persada No. 011/BRR-ASB/SPKK/IV/2006 Tgl. 29 April 2006
CV. JASA PERSADA KONSULTAN No. 051.E/ST/JP/X/2006 tgl. 2 Oktober 2006 CV. JASA PERSADA KONSULTAN No. 051.D/ST/JP/X/2006 tgl. 2 Oktober 2006 PT. BUMI TORAN KENCANA No. 016.B/ST/BTK/X/2006 tgl. 2 Oktober 2006 PT. BUMI TORAN KENCANA No. 016.C/ST/BTK/X/2006 tgl. 2 Oktober 2006
- Desa Tugala Sirombu
- Desa Bawodobara Pulau Tello Kec. Pulau-pulau Batu Kab. Nisel
- Kec. Telukdalam Nias Selatan F N Nias
-
600,000,000 520,000,000
100% 39%
50% 50%
Proses Pelaksanaan Proses Pelaksanaan
1,000,000,000
-
1,000,000,000
100%
50%
Proses Pelaksanaan
75,667,500
95%
100%
79,650,000
350,000
64,000,000
- Kelurahan Pasar Gunungsitoli
S S
600,000,000 1,320,000,000
333,000,000 333,000,000
Gunungsitoli, Sirombu, Telukdalam, PP. Batu a. Perencanaan Pembangunan Gedung Kursus Wanita
c. Tata Ruang Penataan Lokasi Parawisata Saroke dan Lagundri d. Studi Potensi dan Pengembangan Parawisata di Nias
Surat Perjanjian No. S507/BRR,462262/VIII/2006
300,000,000 300,000,000
-
-
-
-
Selesai
No
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
K/S F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
NAMA PERUSAHAAN
Nilai Kontrak Awal
Sisa Kontrak
NOMOR/TGL KONTRAK
e. Perencanaan Rehabilitasi Bangunan Bersejarah
K
N Nias dan Nias Selatan
f. Pengawasan Rehabilitasi Bangunan Bersejarah
N Nias dan Nias Selatan
g Pengawasan Rehab Kantor Pemberd. Perempuan Kabupaten h. Perencanaan Pembangunan KUA i. Pengawasan Pembangunan KUA
- Kec. Lolowa’u Kab. Nias Selatan N Gunungsitoli N Lahewa dan desa Foa N Lahewa dan desa Foa
K K K
1 1
Pkt Pkt
160,000,000
K
- Lahewa
KONSULTAN No. 051.A/ST/JP/X/2006 tgl. 9/10/2006
-
- Desa FOA Kec. Gunungsitoli Idanoi
KONSULTAN No. 051.B/ST/JP/X/2006 tgl. 2/10/2006
-
Pkt Pkt Pkt
N Gunungsitoli dan Telukdalam
1
Pkt
93,866,000
K
N Gunungsitoli dan Telukdalam
1
Pkt
53,838,000
K
N Bawomataluo Muara Indah, Fondrako Bonioniowulu-wulu, pemandian F air panas Mbomboaukhu, dan air terjun Bahomo'awo
1
Pkt
3,305,015,000 600,000,000
3
Pkt
300,000,000
1 50
Pkt Pkt
105,015,000 1,000,000,000
K
c. Penataan Lahan Parkir dan Tempat Penjualan Souvenir Desa Bawamataluo d. Rehabilitasi Rumah Adat Nias
K K
F F
Bawomataluo Nias dan Nias Selatan
KET
%
159,850,000
100%
100%
88,825,000
95%
100%
Selesai
85,286,250
30%
0
Proses pelaksanaan
30%
30%
Proses pelaksanaan
30%
38%
Proses pelaksanaan
( RP )
8,000,000 31,217,000 8,919,000
K
K
150,000
-
1 2 2
Fisik
(%)
Selesai 159,850,000
CV. PERCA BANGUN PERSADA No. 020.C/PB/X/2006 tgl. 27-9-2006
j. Perencanaan Pembangunan Panti Asuhan
b. Penataan Lokasi Parawisata Nias
Keu
Fisik
Realisasi Keuangan
120,000,000
k. Pengawasan Pembangunan Panti Asuhan - Gedung dan Bangunan a. Rehabiliatasi Rumah Adat Bawamataluo ( Tahap I )
CV. JASA PERSADA KONSULTAN No.01/BRRASB/SPK-K/IV/2006 tgl 28 April 2006
Rencana (%)
CV. DUTA MULIA PERSADA No. 011/BRR-ASB/SPKK/IV/2006 tgl. 29 April 2006
L
93,500,000
748,189,500 CV. OWALO 176/BRR.462262/K-PPK/X/2006 10 Oktober 2006
a. Desa Sihareo Siwahili dan Desa Tumori Kec. Gunungsitoli
e. Rehabilitasi Situs Budaya Nias Selatan
K
F
300,000,000
b. Hilinakhe, Lolomoyo Tuhemberua, Lelewonu Nikootano, Tumori Balohili, Dahadano Sogawu-gawu dan Iraonogeba c. Gunungsitoli Idanoi, Desa Oladano Kec. Idanogawo dan Desa Sisobahili Kec. Ulugawo
120,000,000
d. Kec. Lahomi dan Kec. Sirombu e. Tugala Oyo f. Hiliduho g. Mandrehe h. Alasa
240,000,000 L 40,000,000 PL 40,000,000 PL 100,000,000 PML 40,000,000 PL
Nias Selatan a. Desa Sifaoro’asi, Lahusa Idanotae, Orahili Gomo, Lahusa I, Idanotae Kecamatan Gomo
K
F
Bawomataluo dan Hilisimaetano
a. Bawomataluo, Kec. Telukdalam
b. Hilisimaetano, Kec. Telukdalam
284,287,500
CV. OWALO 133/BRR.462262/K-PPK/IX/2006 26 September 2006 120,000,000
10
Pkt
200,000,000
L
L
CV. TATUWU 134/BRR.46262/K-PPK/IX/2006 26 September 2006 CV. BETZY 135/BRR.462262/K-PPK/IX/2006 26 September 2006
L
116,400,000
3,600,000
34,920,000
119,502,000
498,000
228,000,000
12,000,000
68,400,000
30%
20%
Proses pelaksanaan Penunjukan Langsung Penunjukan Langsung Pemilihan Langsung Penunjukan Langsung
10,400,000
44,880,000
30%
0
Proses pelaksanaan
35,850,600
149,600,000 CV. BUAKHE INDAH No. 141/BRR.462262/KPPK/IX/2006 Tgl. 26 Sept. 2006
160,000,000
b. Lolowa'u f. Rehabilitasi Rumah Adat Nias Selatan
284,287,500
L
149,600,000
Penunjukan Langsung
40,000,000 50
Pkt
1,000,000,000
600,000,000
400,000,000
CV. PUTRA SELATAN 142/BRR.462262/K-PPK/IX/2006 26 September 2006 L
L
CV. TUNAS JAYA No. 143/BRR.462262/K-PPK/IX/2006 Tgl, 26 Sept. 2006
839,856,000
496,646,000
103,354,000
148,993,800
30%
0
Proses pelaksanaan
343,210,000
56,790,000
102,963,000
30%
0
Proses pelaksanaan
No
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
K/S F/N
LOKASI
VOL
SAT
Pagu DIPA
K/L/P
NAMA PERUSAHAAN
Nilai Kontrak Awal
Sisa Kontrak
NOMOR/TGL KONTRAK g. Penataan lahan parkir di tempat penjualan Soevenir Desa Lagundri VI Penguatan Kelembagaan Pengarustamaan Gender dan Anak 1 Pembinaan Peranan Wanita - Dukungan Pengelolaan - Pembelian Inventaris Kantor - Biaya Operasional Konseling - Biaya Sewa - Gedung dan Bangunan * Bantuan gedung kursus wanita ( 4 lokasi x 200 m2) di Gedung Sitoli, Sirombu, Telukdalam, Pulau-Pulau Batu
* Bantuan Pembangunan KUA ( 2 unit x 100 m)
S
N Lagundri
N N N N
K
K
F
F
Nias dan Nias Selatan
1
Pkt
2
Pkt
800
M2
2,957,870,000 2,557,870,000 316,800,000 42,000,000 70,000,000 20,000,000 2,109,070,000
%
(%)
448,023,780
24%
27%
( RP )
KET
1,663,200,000 CV. FELIX No. 131/BRR.462262/KPPK/IX/2006 26 September 2006 L
b. Gunungsitoli
413,700,000
L
c. Telukdalam
416,900,000
L
416,900,000 445,870,000
L
m2
Fisik
1,841,105,600
415,700,000
200
Keu
Fisik
Realisasi Keuangan
100,000,000
a. Tugalalahomi
d. Pulau Tello Kab. Nias
Rencana (%)
CV. MANDALA AGUNG PERKASA 132/BRR.462262/K-PPK/IX/2006 26 September 2006 CV. ROROWA’AURI 139/BRR.462262/K-PPK/IX/2006 26 September 2006 CV. ROMI 140/BRR.462262/K-PPK/IX/2006 26 September 2006
395,647,000
20,053,000
118,694,100
30%
38%
Proses pelaksanaan
374,319,600
39,380,400
112,295,880
30%
32%
Proses pelaksanaan
347,693,000
69,207,000
104,307,900
15%
Proses pelaksanaan
354,046,000
62,854,000
106,213,800
30%
3%
Proses pelaksanaan Proses pelaksanaan
184,364,000
38,571,000
30%
50%
Proses pelaksanaan
185,036,000
37,899,000
30%
38%
Proses pelaksanaan
CV. TUJUH SERANGKAI 136/BRR.462262/KPPK/IX/2006 26 September 2006 a. Kec. Lahewa
222,935,000
b. Desa Foa 2
Pembinaan dan Perlindungan Kesos Anak Terlantar - Belanja Honor Tidak Tetap ( Hnr Petugas 4 org x 8 bln x 5 cc) - Fasilitas Children Centre * Pembuatan Play Group * Pengadaan Buku Pelajaran / Iqra' * Bantuan Sarana Perpustakaan Anak * Bantuan Sarana Bermain * Sewa Tempat * Pembelian barang / Administrasi CC TOTAL Jumlah Paket Kontrak Jumlah Paket Swakelola Jumlah Paket Fisik Jumlah Paket Non Fisik
S S
N N N N N N
160 5 5 5 5 5 5 5
OB Pkt Pkt Pkt Pkt Pkt Pkt Pkt
222,935,000 400,000,000 153,000,000 247,000,000
22 49
Keterangan : (K / S) : K = Kontrak, S = Swakelola (F / N) : F = Fisik, N = Non Fisik (K / L / P ) : K = Terkontrak (Paket Pekerjaan Yang Sudah Diberikan SPK) (K / L / P) : L = Proses Lelang (Paket Yang Sudah Melakukan Pelelangan) (K / L / P) : P = Persiapan (Paket Yang Belum Melakukan Pengumuman Pelelangan
L
CV. OLORA INDAH 137/BRR.462262/KPPK/IX/2006 Tgl. 26 September
55,309,200
55,510,800 -
50,000,000 25,000,000 25,000,000 25,000,000 50,000,000 72,000,000
39,114,726,000 25 29
L
24,504,871,775
1,778,954,725 % Real.Fisik terhadap pagu % Real.Kontrak terhadap pagu
19,790,463,705
81%
72.70305 45.55 40.35
ANGGARAN REHABILITASI DAN REKONTRUKSI NAD - NIAS APBN 2006 LAPORAN STATUS PELAKSANAAN KEGIATAN SATKER ` SATUAN KERJA : 094.06.462247) BRR - PENDIDIKAN DAN KESEHATAN NIAS LOKASI : (07.11) KABUPATEN NIAS PROGRAM : (01.90.0415) PROGRAM REHABILITASI DAN REKONSTRUKSI NAD DAN NIAS KODE
KEGIATAN / SUB KEGIATAN / JENIS BELANJA / RINCIAN BELANJA K/S
1
2
0415.4597 KESIAPSIAGAAN BENCANA 0062 PAMERAN/VISUALISASI/PUBLIKASI DAN PROMOSI 521119Belanja Barang Operasional Lainnya PERENCANAAN PROGRAM Perencanaan Program Promosi Kesehatan untuk kesiapsiagaan bencana PELAKSANAAN PROMOSI KESEHATAN - Pelatihan Gerak Cepat dalam Penanggulangan Bencana - Promosi kesiap-siagaan Bencana kepada Masyarakat EVALUASI PROMOSI KESEHATAN - Pelaksanaan Evaluasi kesiap-siagaan Bencana 521219Belanja Barang Non Operasional Lainnya PENGADAAN PERALATAN DAN OBAT - Pengadaan peralatan dan obat penanggulangan bencana - Biaya Distribusi dan Operasional Lapangan 0275 PENGADAAN ALAT KEDOKTERAN, KESEHATAN DAN KB 532111Belanja Modal Peralatan Dan Mesin - Peralatan Kamar Operasi - Fasilitas Rawat jalan dan rawat Inap 0415.4617 PEMELIHARAAN DAN PEMULIHAN KESEHATAN 0233 OPERASIONAL DAN PEMELIHARAAN RUMAH SAKIT 521119Belanja Barang Operasional Lainnya - Perlengkapan / Peralatan Recam Medik - Bahan dan Pemeriksaan Laboratorium - Pengadaan pakaian kerja Kamar Operasi - Alat Rumah Tangga 521211Belanja Bahan - Pangadaan ATK RSU Gunungsitoli 523112Belanja Biaya Pemeliharaan Gedung dan Bangunan Lainnya - Pemeliharaan Gedung & Sarana Gedung Rumah Sakit 0415.4640 PELAYANAN KEFARMASIAN DAN ALAT KESEHATAN 0160 PENGADAAN OBAT-OBATAN/VAKSIN 521211Belanja Bahan - Pengadaan obat-obatan 522119Belanja Jasa Lainnya - Biaya Distribusi Obat 0415.4654 PENINGKATAN KESEHATAN MASYARAKAT 0164 PEMBANGUNAN GEDUNG KESEHATAN 533111Belanja Modal Gedung dan Bangunan BIAYA KONSTRUKSI PEMBANGUNAN BARU PENGGANTI - Puskesmas Rawat Inap Plus NAMA PAKET PEKERJAAN : Puskesmas Rawat Inap Plus Lahewa -
-
-
-
Puskesmas Rawat Jalan Type 135 M2 (2 Unit x 135 m2) NAMA PAKET PEKERJAAN : Puskesmas Rawat Jalan Type 135 M2 Afulu Puskesmas Rawat Jalan Type 135 M2 Ulugawo
3
Format : OC-1
F/N
LOKASI
VOL
SAT
PAGU DIPA (Rp)
K/L/P
4
5
6
7
8
9
S
N
Kab. Nias
S S
N N
S
N Kab. Nias
Kab. Nias Kab. Nias
K S
F Dinas Kesehatan N
K K
F F
RSU. Gunungsitoli RSU. Gunungsitoli
K K K K
F F F F
RSU. Gunungsitoli RSU. Gunungsitoli RSU. Gunungsitoli RSU. Gunungsitoli
1.00 KEG 1.00 KEG 1.00 KEG 1.00 KEG
1.00 KEG 1.00 KEG
1.00 1.00
pt pt
1.00 1.00 1.00 1.00
pt pt pt pt
K
F
RSU. Gunungsitoli
1.00
pt
S
F
RSU. Gunungsitoli
1.00
pt
K
F
S
N
K
K K
F
F F
Dinas Kesehatan
1.00
pkt
1.00
pt
Kec. Lahewa
Kec. Afulu Kec. Idanogawo
25,000,000 375,000,000 172,700,000 202,300,000 25,000,000 25,000,000 225,000,000 225,000,000 150,000,000 75,000,000 4,689,498,000 4,689,498,000 4,000,000,000 689,498,000 971,753,000 971,753,000 698,387,000 338,709,000 100,000,000 84,678,000 175,000,000 84,657,000 84,657,000 188,709,000 188,709,000 620,324,000 620,324,000 580,324,000 580,324,000 40,000,000 40,000,000 12,159,192,000 7,407,058,000 7,407,058,000 4,325,500,000 1,203,500,000 1,203,500,000
135 M2 135 M2
783,000,000 783,000,000 391,500,000 391,500,000
K K K K K K
F F F F F F
Kec. Afulu Kec. Afulu Kec. Lahewa Kec. Lotu Kec. Tuhemberua kec. Alasa
80 80 80 80 80 80
M2 M2 M2 M2 M2 M2
1,440,000,000 1,440,000,000 240,000,000 240,000,000 240,000,000 240,000,000 240,000,000 240,000,000
Rumah Dokter (3 Unit x 70 m2) NAMA PAKET PEKERJAAN : Rumah Dinas Dokter Bawolato Rumah Dinas Dokter Mandrehe Rumah Dinas Dokter Lahewa
K K K
F F F
Kec. Bawolato Kec. Mandrehe Kec. Lahewa
70 M2 70 M2 70 M2
203,000,000 203,000,000 203,000,000
BIAYA KONSULTAN - Pengadaan Jasa Konsultan Perencanaan Bidang Kesehatan - Pengadaan Jasa Konsultan Pengawasan Bidang Kesehatan - Biaya Pengelolaan/Administrasi Proyek Bidang Kesehatan
NOMOR/TGL.KONTRAK 10
NILAI KONTRAK 11
Keu 12
Fisik 13
Rp. 14
5,339,498,000 650,000,000 425,000,000 25,000,000
Puskesmas Pembantu ( 6 Unit x 80 m2) NAMA PAKET PEKERJAAN : Puskesmas Pembantu Lauru Fadoro (Pusk. Afulu) Puskesmas Pembantu Faekhu Na'a (Puks. Afulu) Puskesmas Pembantu Idanondrawa Tefao (Puks. Lahewa) Puskesmas Pembantu Hiligeo Afia (Pusk. Lotu) Puskesmas Pembantu Simpang Lima (Pusk. Awa'ai) Puskesmas Pembantu Hiligawoni (Pusk. Alasa)
Rumah Para Medis (2 Unit x 50 m2) NAMA PAKET PEKERJAAN : Rumah Dinas Paramedis Tuhemberua
NAMA PERUSAHAAN
Status Bulan : 23 November 2006 Rencana (%) Realisasi Keuangan
K K S
Kec. Tuhemberua
F Nias F Nias N Nias
50 M2
290,000,000 3,081,558,000 471,765,000 697,641,000 126,717,000
Ket
16
17
-
K
No. M-199/BRR.462247/VII/2006
25000000
K K
No. M-199/BRR.462247/VII/2006 No. M-199/BRR.462247/VII/2006
172700000 202300000
K
No. M-199/BRR.462247/VII/2006
25000000 -
K P
CV. RAJAWALI KARUNIA ABADI NO. M-717/BRR-462247/X/2006, Tgl 17-Okt-2006.
100,049,703
#REF!
K K
CV. MEFALTI KARUNIA ABADI CV. RAJAWALI KARUNIA ABADI
NO. M-734/BRR-462247/X/2006, Tgl 27-Okt-2006. NO. M-626/BRR-462247/X/2006, Tgl 11-Okt-2006.
3,507,796,501 618,008,827
149,178,270
K K K L
CV. CV. CV. CV.
NO. M-627/BRR-462247/X/2006, Tgl 11-Okt-2006. NO. M-569/BRR-462247/X/2006, Tgl 10-Okt-2006. NO. M-566/BRR-462247/X/2006, Tgl 10-Okt-2006. No. M-765a/BRR-462247/XI/2006, tgl 3 Nop. 2006
323,451,000 95,500,000 84,500,000 173,809,900
K
CV. LASER
NO. M-565/BRR-462247/X/2006, Tgl 10-Okt-2006.
84,500,000
CIPTA SENTOSA MITRA MEDICA SOGUNANIA MOI MULIA PERKASA
149,178,270 149,178,270 97,035,300
52,142,970 -
L
PT. ABAD ARTA MEDICA
NO. M-766a/BRR-462247/XI/2006, Tgl 3 Nop. 2006
575,131,100 -
P
K
L K
CV. ASEAN UTAMA
CV. SUKA KARYA CV. ANUGRAH PUTRA
NO. M-621/BRR-462247/X/2006, Tgl 11-Okt-2006.
NO. M-623/BRR-462247/X/2006, Tgl 11-Okt-2006. M-289/BRR.462247/VIII/2006, Tgl. 4 Agustus 2006
K K K K K K
CV. APRIL CV. SETIAWAN CV. SUDIRMAN CV. GADING ASIA MAS CV. SOGUNANIA CV. BETZY
M-290/BRR.462247/VIII/2006, Tgl. 4 Agustus 2006 M-291/BRR.462247/VIII/2006, Tgl. 4 Agustus 2006 M-292/BRR.462247/VIII/2006, Tgl. 4 Agustus 2006 M-293/BRR.462247/VIII/2006, Tgl. 4 Agustus 2006 M-294/BRR.462247/VIII/2006, Tgl. 4 Agustus 2006 M-295/BRR.462247/VIII/2006, Tgl. 4 Agustus 2006
K K K
CV. SENTRAL M-296/BRR.462247/VIII/2006, Tgl. 4 Agustus 2006 CV. RELLINOSIA PANCA PUTRA M-297/BRR.462247/VIII/2006, Tgl. 4 Agustus 2006 CV. FAISAL NO. M-622/BRR-462247/X/2006, Tgl 11-Okt-2006.
9,118,785,000 7,060,051,000 7,060,051,000
2,804,646,200 2,465,155,200 2,465,155,200 -
1,184,240,000
236,848,000
20
765,600,000.00 380,000,000.00 385,600,000 100.00
100.00
422,480,000 114,000,000 308,480,000
30 80.000
100.00 100.00 100.00 100.00 100.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00
427,074,960 71,206,200 71,639,400 71,424,900 69,740,160 71,497,500 71,566,800
30.00 57.780 30.00 37.840 30.00 100.000 30.00 43.360 30.00 53.480 30.000 61.260
100.00 100.00
100.00 100.00
264,675,740 54,018,300 151,281,440 59,376,000
30.000 80.000 30.000
69.530 86.227 5
1,423,583,200 237,354,000 238,798,000 238,083,000 232,467,200 238,325,000 238,556,000
567,082,800 180,061,000 189,101,800 197,920,000
5
86.893
-
290,000,000 F
Fisik (%)
-
609,000,000
K
(%) 15
K
K K P
CV. MILLENIUM
CV. Biramos Konsultan CV. Duta Mulia Persada
M-298/BRR.462247/VIII/2006, Tgl. 4 Agustus 2006
M-031/BRR.462247/IV/2006, Tgl. 25 April 2006 M-286/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006
288,750,000 2,830,795,000 697,000,000 430,925,000
100
100 100
100
86,625,000
30.000
100
100 100
1,027,451,500 557,600,000 129,277,500 -
80.000 30.000
80
KODE
KEGIATAN / SUB KEGIATAN / JENIS BELANJA / RINCIAN BELANJA K/S
1
2 -
0231
Pengadaan Jasa Konsultan Perencanaan Paket Puskesmas Untuk Pembangunan Sarana Kesehatan Tahun 2007-2009 Pengadaan Jasa Konsultan Perencanaan Kantor Dinkes, GFK dan SPK/AKPER untuk Pembangunan Fisik Tahun 2007
OPERASIONAL PUSKESMAS 512112Belanja Uang Honor Tidak Tetap TUNJANGAN DAERAH TERPENCIL DAN TENAGA HARIAN LEPAS - Dokter/Dokter Gigi di Daerah Terpencil (2Org x 12 Bln) - Tenaga Kesehatan di Daerah terpencil (10 Org x 12 Bln) - Tenaga Harian Lepas / Paramedis Sukarela (100 Org x 12 Bln) - Tenaga Harian Lepas Dinas Kesehatan (37 Org x 12 Bln) HONORARIUM TIM TEKNIS - Ketua Tim Teknis ( 2 Org x 9 Bln ) - Anggota Tim Teknis ( 6 Org x 9 Bln ) - Cadangan 521119Belanja Barang Operasional Lainnya DUKUNGAN OPERASIONAL PUSKESMAS - Operasional Puskesmas (18 Pusk x 12 Bln) - Operasional Puskemas Keliling (12 Pusk x 12 Bln) - Operasional Puskesmas Pembantu (101 Pustu x 12 Bln)
PENGADAAN ALAT KEDOKTERAN, KESEHATAN DAN KB 532111Belanja Modal Peralatan dan Mesin PERALATAN KESEHATAN DASAR - Peralatan Puskesmas Pembantu - Emergency Kit - Sarana Non Medis (Meja, Kursi, Lemari, Tempat Tidur, dll) 1035 DUKUNGAN PENYELENGGARAAN PELAYANAN KESEHATAN 573119Belanja Lembaga Sosial Lainnya REVITALISASI POSYANDU - Sosialisasi dan Penyegaran Pengurus Posyandu TK Kabupaten - Sosialisasi dan Penyegaran Pengurus Posyandu TK Kecamatan - Pembentukan Lembaga Pembina Posyandu (LPP) TK Desa/Kel - Pelatihan Kader Posyandu - Insentif Kader Posyandu (7 org x 487xRp 15000 x 12 bln) PEMBINAAN DAN TELAAH KEMANDIRIAN POSYANDU - Kontak Kader (4 kw x 1 Kl) - Lomba Posyandu
F/N
LOKASI
VOL
SAT
PAGU DIPA (Rp)
K/L/P
3
4
5
6
7
8
9
10
K
F
Nias
1,220,122,000
L
PT. PEMETAR ARGEO CONSULT NO. M-708/BRR-462247/X/2006, Tgl 14-Okt-2006.
K
F
Nias
565,313,000
L
CV. TRICONE ENGINEERING
S S S S
N N N N
S S
N Satker Pend & Kes N Satker Pend & Kes
S S S
N Puskesmas N Puskesmas N Puskesmas Pembantu
2,006,399,000 1,650,000,000 1,650,000,000 1,395,000,000 45,000,000 210,000,000 67,500,000 135,000,000 7,500,000 356,399,000 356,399,000 156,600,000 78,480,000 121,319,000
Puskesmas Puskesmas Puskesmas D.Kesehatan
0275
9305. 9305 PERBAIKAN GIZI MASYARAKAT 0232 PELAYANAN KESEHATAN/PERBAIKAN GIZI IBU/ANAK & KB 521119Belanja Barang Operasional Lainnya PENGADAAN ANTROPOMETRI KIT - Timbangan Berat Badan - Alat Ukur Panjang Badan - Alat Ukur Tinggi Badan PELAKSANAAN - Pelay. Tata Laksana Pasca Perawatan Kasus Gizi Buruk di Rum - Sosialisasi Tata Laksana Pel. Anak Gizi Buruk di Tingkat Puskes
K K K
Puskesmas Puskesmas Puskesmas
S S S S S
N N N N N
S S
N Kab. Nias N Kab. Nias
Kab. Nias Kab. Nias Kab. Nias Kab. Nias Kab. Nias
D.Kesehatan K K K
F F F
S S
N Puskesmas N Puskesmas
0415.9307 PENY. KEBIJAKAN DAN MANAJEMEN PEMBANGUNAN KESEHATAN 0012 PENDIDIKAN DAN PELATIHAN TEKNIS 521119Belanja Barang Operasional Lainnya PENDIDIKAN DAN PELATIHAN TENAGA KESEHATAN - Pelatihan Manajemen Puskemas S - Pelatihan dan Pendidikan Kesehatan S - Cadangan - Program Beasiswa Dokter Umum, Dokter Spesialis dan Magiste S 0277
F F F
PENGADAAN ALAT PENGOLAH DATA 532111Belanja Modal Peralatan dan Mesin - Pengadaan Perlengkapan Sistem Informasi Kesehatan Puskesm K Pengadaan Perlengkapan Sistem Informasi Kesehatan Kantor K Dinas Kesehatan - Pengadaan Jaringan Sistem Informasi Managemen Rumah Sak K
0415.9469 PENGEMBANGAN PENDIDIKAN UNTUK SEMUA 0001 ADMINISTRASI UMUM 512112Belanja Uang Honor Tidak Tetap S 521119Belanja Barang Operasional Lainnya S 521211Belanja Bahan S 522111Belanja Langganan Daya dan Jasa S 522116Belanja Sewa S 522119Belanja Jasa Lainnya S 524119Belanja perjalanan lainnya S 532111Belanja Modal Peralatan dan Mesin S 0051 PENYUSUNAN PROGRAM DAN RENCANA KERJA/TEKNIS/PROGRAM 522115Belanja Jasa Konsultan - Pengadaan Konsultan Perencana Program Pendidikan Nias S
N D.Kesehatan N D.Kesehatan N UGM
NAMA PERUSAHAAN
12 set 12 set 12 set
1,200,000,000 1,200,000,000 1,200,000,000 600,000,000 240,000,000 360,000,000 1,545,735,000 1,545,735,000 1,365,735,000 84,575,000 160,000,000 345,540,000 162,000,000 613,620,000 180,000,000 80,000,000 100,000,000 976,600,000 976,600,000 976,600,000 21,000,000 12,000,000 4,500,000 4,500,000 955,600,000 710,600,000 245,000,000
NOMOR/TGL.KONTRAK
NO. M-709/BRR-462247/X/2006, Tgl 14-Okt-2006.
NILAI KONTRAK 11
545,000,000
109,000,000
20
157,500,000 157,500,000 -
157,500,000 52,500,000 105,000,000
M-199/BRR.462247/VII/2006, Tgl. M-199/BRR.462247/VII/2006, Tgl. M-199/BRR.462247/VII/2006, Tgl.
356399000 356399000 156600000 78480000 121319000
9.55
75.00
-
97,416,000 97,416,000
K K K
CV. MITRA MEDICA PT. NIAGA MANDIRI LESTARI CV. CIPTA SENTOSA
NO. M-625/BRR-462247/X/2006, Tgl 11-Okt-2006. NO. M-718/BRR-462247/X/2006, Tgl 17-Okt-2006. NO. M-719/BRR-462247/X/2006, Tgl 17-Okt-2006.
M-236/BRR.462247/VII/2006, Tgl. M-236/BRR.462247/VII/2006, Tgl. M-236/BRR.462247/VII/2006, Tgl. M-236/BRR.462247/VII/2006, Tgl. M-236/BRR.462247/VII/2006, Tgl. M-236/BRR.462247/VII/2006, Tgl. M-236/BRR.462247/VII/2006, Tgl.
K
CV. LASER
Dinas Kesehatan Kab.Nias
NO. M-767a/BRR-462247/XI/2006, Tgl 3 Nop.2006
M-119/BRR.462247/VII/2006, Tgl.
568,896,372 225,935,345 324,720,000
1545735000 1545735000 1365735000 84575000 160000000 345540000 162000000 613620000 180000000 80000000 100000000 21,000,000 21,000,000 21,000,000 21,000,000
97,416,000 84,575,000 84,575,000
30
84,575,000
-
245000000 5,097,785,600 5,000,000,000
M-119/BRR.4622447/VII/2006, Tgl.
S-402/BRR.4622447/VIII/2006, Tgl.
10236000000 10236000000 236000000
5,000,000,000
10,000,000,000
5,000,000,000 97,785,600
K
CV. BER£IN SIM@NDE
NO. M-629/BRR-462247/X/2006, Tgl 11-Okt-2006.
325,952,000
F
195,400,000
K
CV. OLORA INDAH
NO. M-628/BRR-462247/X/2006, Tgl 11-Okt-2006.
180,549,000
766,250,000
K
CV. LASER
NO. M-624/BRR-462247/X/2006, Tgl 11-Okt-2006.
N
(%) 15 20
1,301,250,000 1,301,250,000 339,600,000
N N N N N N N N
Rp. 14 231,574,000
512999000
11,820,035,000 10,518,785,000 10,518,785,000 10,518,785,000 236,000,000 162,785,000 120,000,000 10,000,000,000
53,822,928,000 1,389,270,000 748,000,000 117,970,000 45,000,000 43,980,000 210,000,000 27,000,000 124,320,000 73,000,000 1,225,460,000 1,225,460,000 538,780,000
Fisik 13
1,157,870,000
F
F
Keu 12
1,265,088,500
758,587,500
49,937,082,472 -
669,760,000 669,760,000 P
97,785,600
30
227,576,250 21,288,794,143 831,711,958 551,000,000 60,000,000 27,920,500 6,142,181 104,700,000 849,277 38,600,000 42,500,000 468,832,000 468832000
30 39.55 59.87 73.66 50.86 62.05 13.97 49.86 3.15 31.05 58.22 38.26
Fisik (%)
Ket
16
17
KODE
KEGIATAN / SUB KEGIATAN / JENIS BELANJA / RINCIAN BELANJA K/S
1
2
- Pemetaan Kondisi Pendidikan Nias dan Nias Selatan PENINGKATAN MUTU PENDIDIKAN 573119Belanja Lembaga Sosial Lainnya - Diagnotis test pra UAN - Remidial Teaching/Bimbingan Belajar Pra UAN 0165 PEMBANGUNAN GEDUNG PENDIDIKAN 522115Belanja Jasa Konsultan PENGADAAN JASA KONSULTAN PERENCANA - Gedung SD, SMP dan SMA - Gedung Perguruan Tinggi KONSULTAN PENGAWAS - Gedung TK, SD, SMP dan SMA (Tahap I) - Gedung Perguruan tinggi - Gedung SD, SMP dan SMA (Lanjutan) - Gedung TK, SD, SMP dan SMA (Tahap II) NAMA PAKET PENGAWASAN TAHAP II : Pengawasan Paket 1-15 Tahap II Pengawasan Paket 16-29 Tahap II Pengawasan Paket 30-45 Tahap II 533111Belanja Modal Gedung dan Bangunan PEMBANGUNAN UNIT GEDUNG BARU - RKB Sekolah Dasar (95 kls x 56 m2) NAMA PAKET PEKERJAAN : ## RKB SD No.070980 Mo'awo ## RKB SD No.070994 Tabaloho Dahana ## RKB SD No .075019 Dahana Tabaloho ## RKB SD No.074046 Lolomoyo ## RKB SD No. 071060 Lasara Idanoi ## RKB SD No. 076695 Saita Garamba ## RKB SD No. 071019 Tuhemberua ## RKB SD No.075026 Alo'oa ## RKB SD No. 071041 Hunosihare'o ## RKB SD No. 071014 Dima ## RKB SD No. 071001 Fadoro Tanose'o ## RKB SD No. 071013 Sisobahili I Tanose'o ## RKB SD No. 070995 Hiligodu Tanose'o ## RKB SD No. 077289 Mida Lolomoyo ## RKB SD No.076076 Banua Sibohou I ## RKB SD No. 077288 Hilisoromi ## RKB SD No. 071088 Mazingo ## RKB SD No.078138 Hilimburune ## RKB SD No.071082 Lawelu ## RKB SD No. 071089 Sisarahili ## RKB SD No.071086 Iraonogambo ## RKB SD No. 076093 Hilisangawola ## RKB SD No. 071176 Sitolu Banua ## RKB SD No. 071179 Sisobandrao ## RKB SD No. 075046 Lolofitu Moi ## RKB SD No.071139 Dima Muzoi ## RKB SD No. 075085 Iraonolase ## RKB SD No.075082 Marafala ## RKB SD No. 077964 Fadoro Hilimbowo ## RKB SD No. 074067 Onozalukhu ## RKB SD No. 075110 Lasara Berua ## RKB SD No. 076678 Fadoro Fulolo ## RKB SD No. 075086 Lauru Afulu ## RKB SD No. 071143 Afulu ## RKB SD No.074060 Bozihona ## RKB SD No. 071054 Bio'uti ## RKB SD No. 076085 Sindrondro RKB SD No.075041 Dahana
F/N
LOKASI
VOL
SAT
3 S
4 N
5
6
7
S S
N N
K K
N N
K K K K
N N N N
K K K
N N N
0154
RKB Sekolah Menengah Pertama (3 kls x 63 m2) NAMA PAKET PEKERJAAN ## RKB SMPN 2 Afulu
NAMA PERUSAHAAN
NOMOR/TGL.KONTRAK 10
9 P
PT. Wacana Tata Akademika
M-036/BRR.462247/V/2006, 5 Mei 2006
K
BT/BS BIMA
029.B/BRR-PKN/06/07/2006
K K
PT. Jefrindo Consultan CV. Duta Mulia Persada
M-035/BRR.462247/IV/2006, Tgl. 25 April 2006 M-036/BRR.462247/IV/2006, Tgl. 25 April 2006
K L K P
PT. Billindo Engineering C. PT. Ametys Utama CV. Gamma ' 91 Consultant
M- 285/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 M- /BRR.462247/VII/2006, Tgl. 28 Juli 2006 M-042/BRR.462247/V/2006, Tgl 05 Mei 2006
CV. Sitim Valley Engineering CV. Citra Pramatra CV. Citra Pramatra
Kec. Gunungsitoli Kec. Gunungsitoli Kec. Gunungsitoli Kec. Gunungsitoli Kec. Gido Kec. Gido Kec. Tuhemberua Kec. Tuhemberua Kec. Tuhemberua Kec. Hiliduho Kec. Hiliduho Kec. Hiliduho Kec. Hiliduho Kec. Alasa Kec. Alasa Kec. Alasa Kec. Mandrehe Kec. Mandrehe Kec. Mandrehe Kec. Mandrehe Kec. Mandrehe Kec. Mandrehe Kec. Sirombu Kec. Sirombu Kec. Lolofitu Moi Kec. Lahewa Kec. Lahewa Kec. Lahewa Kec. Lahewa Kec. Lahewa Kec. Namohalu Esiwa Kec. Lotu Kec. Afulu Kec. Afulu Kec. Idanogawo Kec. Idanogawo Kec. Bawolato Kec. Bawolato
168 168 168 168 224 168 168 168 168 168 168 168 168 168 168 168 168 168 168 168 168 168 224 168 168 168 168 168 168 168 168 168 168 168 168 168 168 168
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
K
F
Kec. Afulu
189
m2
564,943,000 K
K K K K K K K K K K K K K K K K K L K K K K K K K K K K K K K K K K K K K
K
F
Kec. Gunungsitoli
432
m2
1,099,337,000 K
CV. CATUR PUTRA AGUNG P. CV. ISTANA GROUP CV. BERKAT CV. TARUNA PERMAI JAYA CV. MURNI JAYA CV. FAHMIN T.S CV. IDA POLA CV. KURNIA UTAMA CV. MEDIUM CV. PERJUANGAN CV. GAPURA CV. SOGUNANIA CV. NISCAHYANTI CV. YA'AHOWU CV. LINDA PERMAI CV. MILENIUM CS. CV. SAHABAT SETIA CV. GOMBU CV. SIAP SEDIA CV. YOGA JAYA PERKASA CV. CIPTA BANGUN PERKASA CV. TUNAS HARAPAN CV. BETZY CV. TUNAS HARAPAN CV. GADING ASIA MAS CV. KURNIA UTAMA CV. CENTRAL CV. BAHAGIA CV. ONODA CV. GAPURA CV. ROTA CV. TARUNA CV. APRIL CV. KARYA UMBU CV. BAHAGIA CV. MEMORI CV. SAMIGOR UD. MAKMUR
M-245/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-246/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-247/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-248/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-249/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-250/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-251/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-252/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-253/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-254/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-255/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-256/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-257/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-258/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-259/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-260/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-261/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-685/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-262/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-263/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-264/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-265/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-266/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-267/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-268/BRR.462247/VIII/2006, Tgl. 2 Agustus 2006 M-269/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 M-270/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 M-271/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 M-272/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 M-273/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 M-274/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 M-275/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 M-276/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 M-277/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 M-278/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 M-279/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 M-281/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006 M-282/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006
CV. TARUNA PERMAI JAYA
M-283/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006
CV. BIDURI
M-284/BRR.462247/VIII/2006, Tgl. 3 Agustus 2006
506,520,000
NILAI KONTRAK 11 669,760,000 397,980,000 397,980,000 100,000,000 297,980,000 36,568,312,500 2,837,303,600 1,213,945,000 1,160,445,000 53,500,000 1,623,358,600 649,396,000 43,962,600 100,000,000 830,000,000 830,000,000 262,000,000 259,000,000 309,000,000 33,731,008,900 15,409,932,100 13,946,307,100 351,668,000 340,868,000 344,724,000 321,000,000 405,208,000 363,897,000 357,607,000 370,317,000 357,222,000 356,017,000 350,165,000 311,472,600 359,194,000 349,333,000 360,551,000 365,352,000 454,161,500 358,554,000 367,657,000 362,199,000 376,715,000 541,148,000 368,276,000 365,616,000 362,444,000 386,649,000 361,623,000 349,301,000 448,308,000 356,552,000 305,399,000 310,384,000 397,865,000 399,343,000 361,041,000 355,204,000 336,199,000 357,073,000
Keu 12
Fisik 13
100.00 100.00 37.368
100 100
100 100
100 100
100 100 100
100 100 100
Rp. 14
(%) 15
468832000 397,980,000 397,980,000 100,000,000 297,980,000 13,664,848,700 1,551,121,120 971,156,000 928,356,000
Fisik (%)
Ket
16
17
70 99.50 100.00 99.33 37.37 54.67
100.00 99.33
80.0
100
42,800,000
80.0
100
579,965,120 467,565,120
72.0
60.000
60,000,000
60.0
100.00
72.0 30.0 30.0 30.0 30.0 30.0 30.0 51.0 86.0 51.0 72.0 30.0 60.0 30.0 86.0 30.0 30.0 60.0 51.0 72.0 72.0 30.0 72.0 72.0 30.0 30.0 30.0 51.0 51.0 72.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0
68.797 49.652 50.181 54.862 44.387 64.152 52.659 54.154 97.211 50.166 72.485 39.91 78.11 48.88 86.137 51.75 44.274 15.57 74.945 50.176 52.953 72.335 50.011 61.004 64.027 48.64 51.518 50.047 41.138 50.778 80.056 67.585 50.072 62.397 48.627 29.372 32.42 61.574
52400000
12,113,727,580
6,315,837,940 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
87.92 86.56 86.74 87.54 87.54 85.32 87.59 87.35 87.46 86.53 87.78 88.27 86.91 86.98 87.33 87.36 89.90
30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
87.38 87.25 88.03 88.60 86.50 87.41 87.15 88.77 87.14 86.88 90.35 86.89 86.74 87.17 89.85 91.12 86.63 87.35 86.74 87.76
253,200,960 102,260,400 103,417,200 96,300,000 121,562,400 109,169,100 107,282,100 188,861,670 307,210,920 181,568,670 252,118,800 93,441,780 215,516,400 104,799,900 310,073,860 109,605,600 136,248,450 107,566,200 220,594,200 184,721,490 271,234,800 389,626,560 110,482,800 263,243,520 260,959,680 115,994,700 108,486,900 104,790,300 228,637,080 181,841,520 219,887,280 93,115,200 119,359,500 119,802,900 108,312,300 106,561,200 100,859,700 107,121,900
100
100
164,014,500
30.0
38.367
100
100
275,073,000
30.0
40.011
30.00 30.00 30.00 30.00
8.26 6.75 14.22 20.61
546,715,000
1,157,760,000
Cadangan
546,715,000 916,910,000 916,910,000
95,080,000
ABT - RKB Sekolah Dasar (96 Lkl x 56 m2) NAMA PAKET PEKERJAAN : RKB SDN 071016 Ononamolo II Lot RKB SDN 074041 Lolomboli RKB MIS NU Gunungsitoli RKB SDN 071060 Lasara Idanoi
K/L/P
F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F
-
1 2 3 4
8 686,680,000 400,000,000 400,000,000 100,000,000 300,000,000 37,832,578,000 2,945,738,000 1,213,945,000 1,160,445,000 53,500,000 1,731,793,000 687,793,000 44,000,000 100,000,000 900,000,000 896,000,000 284,600,000 280,000,000 331,400,000 34,886,840,000 16,016,960,000 14,257,600,000 14,407,680,000 351,668,000 352,362,000 351,116,000 351,880,000 455,844,000 367,206,000 361,172,000 375,034,000 360,199,000 358,638,000 356,276,000 349,835,000 359,678,000 364,693,000 366,654,000 369,753,000 457,456,000 362,602,000 368,082,000 363,071,000 378,174,000 542,700,000 368,326,000 366,297,000 363,382,000 387254000 378,087,000 365,599,000 449,866,000 376,706,000 367,227,000 360,383,000 398,905,000 445,678,000 361,883,000 358,408,000 366,159,000 369,427,000
K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K
-
RKB STT Sunderman (6 kls x 72 m2) NAMA PAKET PEKERJAAN : (lebih Rp 58,423,000) ## RKB STT Sudermann
PAGU DIPA (Rp)
18,321,076,800.00
18,869,880,000 14,407,680,000
K K K K
F F F F
Kec. Gunungsitoli Kec. Gunungsitoli Kec. Gunungsitoli Kec. Gido
15,964,718,000 467,783,000.00 465,156,000.00 372,965,000.00 460,554,000.00
K K K K
CV. TIORIDA M-686/BRR.462247/X/2006, Tgl. 12 Oktober 2006 CV. DUA RIBU M-641/BRR.462247/X/2006, Tgl. 12 Oktober 2006 CV. FOVOLA INDAH PERMATA A M-642/BRR.462247/X/2006, Tgl. 12 Oktober 2006 CV. BINA MAJU M-645/BRR.462247/X/2006, Tgl. 12 Oktober 2006
15,004,582,800.00 465,722,000.00 385,008,800.00 371,763,000.00 387,040,000.00
4501374840 139716600 115502640 111528900 116112000
KODE
KEGIATAN / SUB KEGIATAN / JENIS BELANJA / RINCIAN BELANJA K/S
1
2 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 -
1 2 3 4
NAMA PAKET PEKERJAAN : RKB SMPS BNKP Hilimajiaya RKB SMPN 2 Lahewa RKB SMPN 2 Lolofitu Moi RKB SMPS Faomasi Lahomi
LOKASI
VOL
SAT
4 F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F
5 Kec. Gido Kec. Gido Kec. Gido Kec. Bawolato Kec. Bawolato Kec. Idanogawo Kec. Idanogawo Kec. Idanogawo Kec. Lotu Kec. Tuhemberua Kec. Tuhemberua Kec. Tuhemberua Kec. Alasa Kec. Alasa Kec. Nahohalu Esiwa Kec. Nahohalu Esiwa Kec. Lahewa Kec. Lahewa Kec. Afulu Kec. Afulu Kec. Hiliduho Kec. Hiliduho Kec. Hiliduho Kec. Lolofitu Moi Kec. Lolofitu Moi Kec. Sirombu Kec. Sirombu Kec. Sirombu Kec. Mandrehe Kec. Mandrehe Kec. Mandrehe Kec. Mandrehe Kec. Mandrehe
6
7
1 2 3 4
PAGU DIPA (Rp) 8 539,253,000.00 263,271,000.00 365,158,000.00 372,030,000.00 430,810,000.00 350,113,000.00 371,602,000.00 462,079,000.00 463,010,000.00 468,061,000.00 499,787,000.00 496,784,000.00 384,229,000.00 433,651,000.00 373,116,000.00 368,861,000.00 477,717,000.00 386,453,000.00 369,995,000.00 462,899,000.00 365,531,000.00 555,484,000.00 465,304,000.00 561,845,000.00 371,254,000.00 380,527,000.00 470,094,000.00 463,856,000.00 464,183,000.00 482,339,000.00 485,349,000.00 468,465,000.00 325,150,000.00
1,737,360,000 428,736,000 455,019,000 421,745,000 431,860,000
RKB Sekolah Menengah Umum (10 Lkl x 72 m2)
1,929,600,000
NAMA PAKET PEKERJAAN : RKB SMAN 1 Gunungsitoli RKB SMAN 3 Gunungsitoli RKB SMAN 2 Gido RKB SMAN 1 Hiliduho
Kec. Gunungsitoli Kec. Gunungsitoli Kec. Gido Kec. Hiliduho
1,715,306,000 325,879,000 468,251,000 459,260,000 461,916,000
PENGADAAN MEUBELAIR 535111Belanja Modal Fisik Lainnya PENGADAAN MEUBALAIR - Meubelair RKB TK - Meubelair RKB SD/MI - Meubelair RKB SMP/MTs - Meubelair RKB SMU/MA - Meubelair RKB SMK - Meubelair RKB STT - Meubelair IKIP Gunung Sitoli ABT - Meubelair SD - Meubelair SMP NAMA PAKET Meubelair Meubelair Meubelair Meubelair Meubelair Meubelair
K K K K
K K K K
F F F F
F F F F
K K K K K K K
F F F F F F F
K K
F F
TK SD/MI SMP SMA/SMK STT IKIP Gunung Sitoli
REHABILITASI GEDUNG 533111Belanja Modal Gedung dan Bangunan - Rehab Sekolah Dasar (Lanjutan Thn. 2005) NAMA PAKET PEKERJAAN : ## - Rehab. Total SD No. 077285 AFIA Lahewa ## - Rehab Total SD No. 071059 Hilibadalu Gido
K/L/P
NAMA PERUSAHAAN
NOMOR/TGL.KONTRAK 10
NILAI KONTRAK 11
Keu 12
Fisik 13
Rp. 14
9 K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K
CV. ANUGERAH SAKTI CV. POPPY CV. FELIX CV. SAHABAT BARU CV. FAMIN T.S CV. ANUGERAH PUTRA CV. JIMMY CLINTON CV. YA'AHOWO CV. SETIAWAN CV. TUJUH SERANGKAI CV. SUDIRMAN CV. KARYA BOGALI CV. TELLY CV. SAHABAT SUKSES MANDRI CV. AVORA CV. FALIERA CV. BINA HARAPAN CV. TITIAN BARU CV. MEDIUM CV. IDAPOLA CV. BUAKHE INDAH CV. MEMORI CV. TELLY CV. FAMIN T.S CV. BUDI CV. MARCO CV. CAHAYA SETIA CV. WELLING CV. PRIBUMI ABDI CV. YOGA JAYA PERKASA CV. PELITA NUSA CV. CIPSA CV. PRIBUMI ABDI
M-646/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-647/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-648/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-650/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-651/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-652/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-653/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-654/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-655/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-657/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-658/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-659/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-660/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-661/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-662/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-663/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-664/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-665/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-667/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-668/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-669/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-670/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-671/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-673/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-674/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-676/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-677/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-678/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-680/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-681/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-682/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-683/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-684/BRR.462247/X/2006, Tgl. 12 Oktober 2006
522,012,000.00 254,187,000.00 302,118,000.00 371,128,000.00 408,224,000.00 336,252,000.00 362,085,000.00 447,064,000.00 443,048,000.00 416,450,000.00 471,940,000.00 430,373,000.00 382,562,000.00 432,955,000.00 315,113,000.00 338,898,000.00 444,406,000.00 385,615,000.00 368,921,000.00 461,949,000.00 356,392,000.00 490,279,000.00 400,877,000.00 464,436,000.00 370,556,000.00 379,529,000.00 466,934,000.00 463,238,000.00 454,257,000.00 480,818,000.00 380,514,000.00 467,517,000.00 324,402,000.00
156603600 76256100 90635400 111338400 122467200 100875600 108625500 134119200 132914400 124935000 141582000 129111900 114768600 129886500 94533900 101669400 133321800 115684500 110676300 138584700 106917600 147083700 120263100 139330800 111166800 113858700 140080200 138971400 136277100 144245400 114154200 140255100 97320600
K K K K
CV. KARYA USADA CV. SUDIRMAN CV. LINDA PERMAI CV. CHAIRANI
M-656/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-666/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-675/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-679/BRR.462247/X/2006, Tgl. 12 Oktober 2006
1,666,719,000.00 392,194,000.00 451,134,000.00 406,678,000.00 416,713,000.00
500015700 117658200 135340200 122003400 125013900
K K K K
CV. BERKAT SYUKUR CV. MESTIKA ABADI CV. EDGARD CV. SETIAWAN
M-643/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-644/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-649/BRR.462247/X/2006, Tgl. 12 Oktober 2006 M-672/BRR.462247/X/2006, Tgl. 12 Oktober 2006
1,649,775,000.00 325,182,000.00 423,896,000.00 458,403,000.00 442,294,000.00
357411600 97554600 127168800
(%) 15 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Fisik (%)
Ket
16
17
10.97 20.57 20.83 14.74 12.67 16.84 25.48 25.19 17.80 14.93 15.63 18.90 13.80 12.18 15.49 15.22 13.94 15.27 16.98 13.79 14.33 11.67 13.05 5.87 14.00 18.17 14.02 10.72 34.27 19.37 16.48 14.15 29.48
2,532,600,000
Kec. Lotu Kec. Lahewa Kec. Lolofitu Moi Kec. Sirombu
Pengadaan Pengadaan Pengadaan Pengadaan Pengadaan Pengadaan
1139
F/N
RKB Sekolah Menengah Pertama (15 Lkl x 63 m2)
-
0273
RKB SDN 071068 Dekha Lahemo RKB MIS Muhammadiyah Foa RKB SDN 075044 Saewe RKB SDN 075034 Siofabanua RKB SDN 077786 Tuhembaruzo RKB SDN 074058 Saiwahili RKB SDN 075040 Awoni La'uso RKB SDN 075043 Oladano RKB SDN 076068 Botombawo RKB SDN 071022 Simpang Lima Las. RKB SDN 076682 Hilimbowo RKB SDN 071024 Tanayao RKB SDN 076073 Ononazara RKB SDN 076688 Hiligawoni RKB SDN 071162 Esiwa RKB SDN 071163 Siwalubanua RKB SDN 071144 Toiwo RKB SDN 077284 Lafau Fadoro Zai RKB SDN 075089 Sisobahili RKB SDN 071153 Sifaoro'asi RKB SDN 076058 Simpang Tiga Balohili RKB SDN 071018 Sinarikhi RKB SDN 075024 Duria Balaki RKB SDN 071085 Ambukha RKB SDN 071070 Onowaembo RKB SDN 071182 Ombolata RKB SDN 071177 Onolimbu RKB SDN 078434 Sisobaoho RKB SDN 076715 Siana'a RKB SDN 076713 Zuzundrao RKB SDN 071092 Hiliduho RKB SDN 071095 Fukagambo RKB SDN 071091 Sisobambowo
3 K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K
6,780,620,000 6,780,620,000 4,081,700,000 65,200,000 2,385,000,000 1,000,200,000 333,400,000 166,700,000 65,600,000 65,600,000 2,698,920,000 2,098,800,000 600,120,000 Sekolah Sekolah Sekolah
K K
F F
Kec. Lahewa Kec. Gido
4 141 30 33 5 5
4.00 5.00
Ruang Ruang Ruang Ruang Ruang Ruang
ruang ruang
22.49 28.44 5.12 13.92
132688200
6106875572
K K K K K K K K K K K K K K K K
6,195,000,000 6,195,000,000 3,750,000,000 2,679,682,110 138,368,160 176,228,500
15.57 13.92 14.20 16.14
K K
CV. KARYA BERSAMA PT. TRITANIA NUSANTARA PT. TRITANIA NUSANTARA PT. TRITANIA NUSANTARA CV. SOGUNANIA CV. SAHABAT SUKSES MANDIRI
CV. WIDYA LESTARINDO CV. BATUARA JAYA
M-757/BRR.462247/XI/2006, Tgl. 1 Nopember 2006 M-736/BRR.462247/X/2006, Tgl. 28 Oktober 2006 M-737/BRR.462247/X/2006, Tgl. 28 Oktober 2006 M-738/BRR.462247/X/2006, Tgl. 28 Oktober 2006 M-758/BRR.462247/XI/2006, Tgl. 1 Nopember 2006 M-759/BRR.462247/XI/2006, Tgl. 1 Nopember 2006
369/BRR-PPN/06/07/2006, 18 April 2006 382/BRR-PPN/06/07/2006, 18 April 2006
6106875572 65000000 4036474398 892952940 982248234 65200000 65000000
6,194,154,400 6,194,154,400
5,925,421,485 5,925,421,485
3,828,117,300 197,668,800 251,755,000
3,559,384,385
100 100
100 100
95.65
187,785,360
100.00
100
251,755,000
100.00
100
KODE
KEGIATAN / SUB KEGIATAN / JENIS BELANJA / RINCIAN BELANJA K/S
1
2 ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
- Rehab Total SD No. 077782 Higawalo Lahewa - Rehab Total SD No. 075039 Hiliwarokha Bawolato - Rehab Total SD No. 071032 Lakha Tuhemberua - Rehab Total SD No. 075046 Lolofitumoi LolofituMoi - Rehab Total SD No. 071150 Ombolata Alasa - Rehab Total SD No. 076094 Onozalukhu Raya Mandrehe - Rehab Total SD No. 071151 Onowaembo Sirombu - Rehab Total SD No. 071149 Lahewa Lahewa - Rehab Total SD No. 078131 Niko'otano Dao Hiliduho - Rehab Total SD No.078013 Turenamohesa Afulu - Rehab Total SD No.071091 Sisobambowo Mandrehe - Rehab Berat/Total SD No. 071063 Soroma'asi lolofitu Moi - Rehab Berat/Total SD No. 071154 Anaoma Alasa - Rehab Total SD No. 075021 Ombolata Salo'o Hiliduho - Rehab Berat/Total SD No. 070988 Hilinakhe G. Sitoli - Rehab Berat/Total SD No. 071012 Hiligodu G. Sitoli - Rehab Berat SD No. 070981 Fodo G. Sitoli - Rehab Berat SD No. 077285 Sisobahili Namohalu - Rehab Berat SD No. 071064 Helefanikha Gido - Rehab Berat SD No. 076398 Lasara Tanose'o Hiliduho - Rehab Berat SD No. 077272 Lolofaoso Tab G. Sitoli - Rehab Berat SD No. 071047 Bawolato bawolato
-
Rehab Sekolah Menengah Pertama (Lanjutan Thn. 2005) NAMA PAKET PEKERJAAN : - Rehab Berat/Total SMP Neg 2 Sirombu - Rehab Total SMP Neg 1 Afulu - Rehab Total SMP Neg 1 Lotu - Rehab Berat/Total SMP Neg 2 Mandrehe - Rehab Ringan/Total SMP Neg 3 Hiliduho - Rehab Berat/Total SMP Neg 2 Gido - Rehab Berat/Total SMP Neg 3 Mandrehe - Rehab Berat/Total SMP Neg 1 Hiliduho - Rehab Berat/Total SMP Neg 1 Hiliduho - Rehab Berat SMP Neg 2 Hiliduho
## ## ## ## ## ## ## ## ## ##
Rehab Sekolah Menengah Umum (Lanjutan Thn. 2005) NAMA PAKET PEKERJAAN ## - Rehab Total SMKS/STMK Gunungsitoli ## - Rehab Berat SMA Neg 1 Alasa ## - Rehab Berat SMA Neg 1 Idanogawo TOTAL Jumlah Paket Kontrak (K) Jumlah Paket Swakelola (S) Jumlah Paket Fisik (F) Jumlah Paket Non Fisik (N)
3 K K K K K K K K K K K K K K K K K K K K K K
K K K K K K K K K K
F/N 4 F F F F F F F F F F F F F F F F F F F F F F
F F F F F F F F F F
LOKASI 5 Kec. Lahewa Kec. Bawolato Kec. Tuhemberua Kec. Lolofitumoi Kec. Alasa Kec. Mandrehe Kec. Sirombu Kec. Lahewa Kec. Hiliduho Kec. Afulu Kec. Mandrehe Kec. Lolofitumoi Kec. Alasa Kec. Hiliduho Gunungsitoli Gunungsitoli Gunungsitoli Kec. Namohalu Kec. Gido Kec. Hiliduho Gunungsitoli Kec. Bawolato
Kec. Sirombu Kec. Afulu Kec. Lotu Kec. Mandrehe Kec. Hiliduho Kec. Mandrehe Kec. Gido Kec. Mandrehe Kec. Hiliduho Kec. Hiliduho
VOL 6 4.00 4.00 3.00 2.00 2.00 4.00 6.00 4.00 4.00 5.00 4.00 3.00 6.00 4.00 6.00 6.00 3.00 4.00 3.00 3.00 5.00 7.00
SAT
PAGU DIPA (Rp)
7 ruang ruang ruang ruang ruang ruang ruang ruang ruang ruang ruang ruang ruang ruang ruang ruang ruang ruang ruang ruang ruang ruang
4.00 4.00 3.00 5.00 7.00 4.00 4.00 4.00 3.00 4.00
ruang ruang ruang ruang ruang ruang ruang ruang ruang ruang
2.00 6.00 5.00
ruang ruang ruang
1,875,000,000 1,286,541,060 117,453,000 194,828,410 117,457,900 186,151,980 125,493,900 90,608,840 124,179,230 132,177,500 105,212,800 92,977,500
-
K F Gunungsitoli K F Kec. Alasa K F Kec. Idanogawo 214 214 172 42 167 47
Realisai Penggunaan Anggaran Bidang Kesehatan dan Pendidikan 90000000000
K/L/P
8 138,506,340 139,454,000 102,753,000 73,377,500 73,402,000 139,503,000 213,027,500 138,779,760 138,308,870 175,313,670 139,527,500 61,691,000 115,003,000 66,003,000 115,015,250 114,990,750 51,327,500 65,718,310 51,364,250 51,327,500 83,177,500 117,514,250
570,000,000 369,684,910 114,001,440 138,218,220 117,465,250 85,710,330,000 65,557,067,080 18,896,675,000
NOMOR/TGL.KONTRAK
NILAI KONTRAK
398/BRR-PPN/06/07/2006, 18 April 2006 399/BRR-PPN/06/07/2006, 18 April 2006 400/BRR-PPN/06/07/2006, 18 April 2006 401/BRR-PPN/06/07/2006, 18 April 2006
11 197,866,200 199,220,000 146,790,000 104,825,000 104,860,000 199,290,000 304,325,000 198,256,800 197,584,100 250,448,100 199,325,000 88,130,000 164,290,000 94,290,000 164,307,500 164,272,500 73,325,000 93,883,300 73,377,500 73,325,000 118,825,000 167,877,500
Keu 12 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
Fisik 13 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
CV. AMPERA UD. RUMONDANG CV. HUTANAGODANG CV. SINAR GOMO CV. BINTANG TIMUR BARU CV. SINAR GOMO CV. SRI DELI CV. DOA IBU CV. TATHA MANDIRI CV. BAHAGIA
402/BRR-PPN/06/07/2006, 18 April 2006 403/BRR-PPN/06/07/2006, 18 April 2006 404/BRR-PPN/06/07/2006, 18 April 2006 405/BRR-PPN/06/07/2006, 18 April 2006 406/BRR-PPN/06/07/2006, 18 April 2006 407/BRR-PPN/06/07/2006, 18 April 2006 408/BRR-PPN/06/07/2006, 18 April 2006 409/BRR-PPN/06/07/2006, 18 April 2006 410/BRR-PPN/06/07/2006, 18 April 2006 415/BRR-PPN/06/07/2006, 18 April 2006
1,837,915,800 167,790,000 278,326,300 167,797,000 265,931,400 179,277,000 129,441,200 177,398,900 188,825,000 150,304,000 132,825,000
100 100 100 100 100 100 100 100 100 100
100 100 100 100 100 100 100 100 100 100
CV. SRI DELI CV. PRATAMA KARYA AGUNG CV. PUTRA UTAMA
416/BRR-PPN/06/07/2006, 18 April 2006 417/BRR-PPN/06/07/2006, 18 April 2006 418/BRR-PPN/06/07/2006, 18 April 2006
100 100 100
100 100 100
10 CV. AIDA CAHAYA LESTARI CV. SINAR HUMENE CV. ARGANA UD. YOMAS SAKTIE UD. DEDI KUIRNIA CV. ANUGERAH SEJAHTERA CV. RAZASA KARYA CV. WAHANA GRAHA PERKASA CV. MILLENIUM 2001 CV. SERENA CV. RIGO UTAMA CV. BAHAGIA CV. DOLOK ZION KONSTRUKSI CV. BAHAGIA CV. ANGGI PUTRA CV. ABDISYAH PUTRA CV. MULTI KONSTRUKSI CV. BUMBURAI INDAH CV. IDA POLA CV. AMPERA CV. BUDI CV. IDA POLA
383/BRR-PPN/06/07/2006, 18 April 2006
K K K K K K K K K K
K K K
Realisasi Penggunaan Anggaran Satker Sementara BRRPendidikan dan Kesehatan
85000000000
NAMA PERUSAHAAN
9 K K K K K K K K K K K K K K K K K K K K K K
84,453,742,080 1,256,587,920
384/BRR-PPN/06/07/2006, 18 April 2006 385/BRR-PPN/06/07/2006, 18 April 2006 386/BRR-PPN/06/07/2006, 18 April 2006 387/BRR-PPN/06/07/2006, 18 April 2006 388/BRR-PPN/06/07/2006, 18 April 2006 389/BRR-PPN/06/07/2006, 18 April 2006 391/BRR-PPN/06/07/2006, 18 April 2006 392/BRR-PPN/06/07/2006, 18 April 2006 393/BRR-PPN/06/07/2006, 18 April 2006 395/BRR-PPN/06/07/2006, 18 April 2006 398/BRR-PPN/06/07/2006, 18 April 2006 399/BRR-PPN/06/07/2006, 18 April 2006 400/BRR-PPN/06/07/2006, 18 April 2006 401/BRR-PPN/06/07/2006, 18 April 2006 402/BRR-PPN/06/07/2006, 18 April 2006 403/BRR-PPN/06/07/2006, 18 April 2006 404/BRR-PPN/06/07/2006, 18 April 2006
528,121,300 162,859,200 197,454,600 167,807,500 59,076,867,472 54,326,573,175 12,849,475,000 47,085,264,003 15,017,018,600
Gunungsitoli, 23 November 2006 Kepala Satuan Kerja Sementara BRR - Pendidikan dan Kesehatan Nias
80000000000 75000000000 70000000000 65000000000
Sisa Dana 78.393%
Dana (Rupiah)
60000000000 55000000000 50000000000 45000000000 40000000000 35000000000 30000000000
Pendidikan 14.093%
25000000000 20000000000 15000000000 10000000000 5000000000 0
Kesehatan
Pendidikan
Pendidikan & Kesehatan
Pagu Dana (Rp)
31887402000
53822928000
85710330000
Realisasi (Rp)
6440785500
12079048888
18519834388
Kesehatan 7.515%
YASOKHI HIA, SE NIP. 131956319
Rp. 14
(%) 15
Fisik (%)
Ket
16
17
197,866,200
100.00
100
199,220,000
100.00
100
146,790,000
100.00
100
104,825,000
100.00
100
104,860,000
100.00
100
199,290,000
100.00
100
304,325,000
100.00
100
198,256,800
100.00
197,584,100
100.00
100
-
100
199,325,000
100
100.00
100
88,130,000
100.00
100
164,290,000
100.00
100
94,290,000
100.00
100
164,307,500
100.00
100
164,272,500
100.00
100
73,325,000
100.00
100
93,883,300
100.00
100
73,370,000
100.00
100
73,325,000
100.00
100
118,825,000
100.00
100
159,483,625
95.00
100
1,837,915,800 167,790,000
100.00
100
278,326,300
100.00
100.00
167,797,000
100.00
100
265,931,400
100.00
100
179,277,000
100.00
100
129,441,200
100.00
100
177,398,900
100.00
100
188,825,000
100.00
100
150,304,000
100.00
100
132,825,000
100.00
100
162,859,200
100.00
100
197,454,600
100.00
167,807,500
100.00
29,340,404,213
34.23
528,121,300
%REALISASI FISIK thdp DIPA
23.44
100 100
34.01
LAPORAN PELAKSANAAN KEGIATAN SATKER ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN 2006 (DANA HASIL MORATORIUM) Deputi Bidang Sub Bidang SATKER Ka SatKer No
Format OC-1
: Bidang Pendidikan dan Kesehatan : Pendidikan dan Kesehatan Nias Selatan : 462253 : Dr.Idaman Zega
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
1
2
Status Bulan : 25 November 2006
K/S F/N LOKASI 3
1 ADMINISTRASI UMUM - Belanja Honorarium - Pengadaan Peralatan dan Mesin
4
5
VOL 6
SAT 7
Pagu DIPA 8
K/L/P 9
N F
1,656,520,000 823,000,000 295,200,000
- Pengadaan Meubeler
F
30,000,000
- Belanja Barang Operasional - Belanja Barang Non Operasional
N N
48,000,000 120,000,000 240,000,000
- Belanja Jasa
F
10
PT.LOGIKREASI MEDAN 023/BRR-N/PK/III/2006 22 MARET 2006 UD KSU TOKOSA GUNUNG SITOLI 032/BRR-N/PK/III/2006
Y.BERKATI SARUMAHA 01/BRR-N/PK/III/2006 06 MARET 2006 CV.GADING ASIA MAS 013/BRR-N/PK/III/2006 25 MARET 2006
- Belanja Perjalanan I KESEHATAN Kesiapsiagaan Bencana 1 Pameran/Visualisasi/Publikasi dan Promosi - Pengadaan Peralatan dan Obat penanggulang bencana - Biaya Distribusi dan Operasional
S S
N N
1 1
Keg Keg
150,000,000 75,000,000 75,000,000
P P
2 Operasional dan Pemeliharaan Rumah Sakit - Perlengkapan Catatan Medis - Bahan dan Alat Pemeriksa Laboratorium
S S
N N
1 1
Pkt Pkt
400,000,000 200,000,000 200,000,000
P P
3 Pengadaan Obat - obatan / Vaksin - Pengadaan Obat - obatan - Biaya Distribusi Obat
S S
N N
1 1
PT PT
482,404,000 452,404,000 30,000,000
P P
4 Peningkatan Kesehatan Masyarakat 1. Pembangunan Gedung Kesehatan Pembangunan PUSKESMAS - Puskesmas Perawatan ( 1 Unit x 250 m2 )
NAMA PERUSAHAAN NOMOR/TGL KONTRAK
N
100,320,000 5,146,006,000
Realisasi Keuangan
Fisik
Nilai Kontrak ( RP ) 12
11
(%)
% 13
14
1,195,020,000 823,000,000 33,700,000
1,173,200,000 599,500,000 129,700,000
64,50%
28,000,000
28,000,000
93,33%
210,000,000 60,000,000
195,000,000 60,000,000
76,92%
150,000,000
135,000,000
100,320,000 2,746,720,939
26,000,000 1,029,802,814
Ket. 17
25,92%
-
-
3,019,250,000
2,746,720,939
1,029,802,814
K
2,003,184,300 571,220,300
581,052,990 171,367,890
30%
80.89 Uang Muaka / DP
307,532,800
92,259,840
30%
42.99 Uang Muaka / DP
59,479,200
17,843,760
30%
100 Uang Muaka / DP
K
F
Gomo
250
M2
2,243,404,875 627,515,625
- Puskesmas ( 1 Unit x 135 m2 )
K
F
Amandray 135
M2
332,305,875
K
- Polindes ( 1 Unit x 45 m2 )
K
F
Lolowau
45
M2
68,055,750
K
- Polindes ( 1 Unit x 45 m2 )
K
F
T.Dalam
45
M2
68,055,750
L
UD.RASAZA KARYA SP.01/BRR-462253/VII/2006 24 JULI 2006 CV.NISKA SP.02/BRR-462253/VII/2006 24 JULI 2006 CV.EVONS SP.05/BRR-462253/VII/2006 29 JULI 2006
CV.SAHABAT SETIA /BRR-462253/VII/2006 15-Sep-06 CV.RIDHO KASIH SP.09/BRR-462253/VII/2006 15-Sep-06
66,347,000
0
87.01 Uang Muaka / DP
SP. - Puskesmas Perawatan Inap Plus ( 1 Unit x 450 m2 )
K
F
T.Dalam
450
M2
1,147,471,875
L
Rehabilitasi Berat - Rehab Total Puskesmas Lahusa ( Lanjutan )
K
F
Lahusa
135
M2
518,417,600 238,254,764
K
- Puskesmas Pembantu( 1 Unit x 80 m2 )
K
F
PP.Batu
80
M2
78,642,200
K
- Polindes ( 1 Unit x 45 m2 )
K
F
Lolowau
45
M2
44,236,237
K
- Polindes ( 1 Unit x 45 m2 )
K
F
PP.Batu
45
M2
44,236,237
K
CV.RANE 251/BRR/N/III/2006 13 MARET 2006 CV.SAHABAT BARU SP.03/BRR-462253/VII/2006 29 JULI 2006 CV.MISI DARMA SP.06/BRR-462253/VII/2006 29 JULI 2006 CV. PONO INDAH
998,605,000
299,581,500
30%
26.03
498,884,764 238,254,764
303,219,824 238,254,764
100%
100
69,707,600
20,912,280
30%
100 Uang Muka / DP
0%
100 Uang Muka / DP
30%
100 Uang Muka / DP
44,079,800
44,000,000
-
13,200,000
No
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
1
2
K/S F/N LOKASI 3
4
- Polindes ( 1 Unit x 45 m2 )
K
F
- Rumah Dokter ( 1 Unit x 70 M2 )
K
F
5
VOL
SAT
Pagu DIPA
6
7
Lahusa
45
M2
44,236,237
K
Lolowau
70
M2
68,811,925
K
257,427,525 151,012,381
K
- Jasa Konsultan Perencanaan
8
K/L/P 9
NAMA PERUSAHAAN NOMOR/TGL KONTRAK 10 SP.07/BRR-462253/VII/2006 29 JULI 2006 CV. OIKHODA SP.08/BRR-462253/VII/2006 29 JULI 2006 CV. FANAYAMA SP.04/BRR-462253/VII/2006 29 JULI 2006 CV. ADIWARNA CONSULTANT
Realisasi Keuangan
Fisik
Nilai Kontrak ( RP ) 12
11
Ket.
(%)
% 13
14
17
44,000,000
13,200,000
30%
69 Uang Muka / DP
58,842,600
17,652,780
30%
100 Uang Muaka /DP
244,651,875 145,530,000
145,530,000 145,530,000
100%
100 Bayar 100 %
031.a/BRR-PKNS/IV/2006 25-Apr-06 - Jasa Konsultan Pengawasan 1. Jasa Konsultan Pengawasan
106,415,144
P
2. Jasa Konsultan Pengawasan
5 Perbaikan Gizi Masyarakat - Pengadaan ANTROPOMETRI Kit - Pelayanan Tata Laksana Perawatan Kasus Gizi Buruk - Pelacakan KLB Kasus Gizi Buruk - Pelatihan Tatalaksana Gizi
S S S S
N N N N
6 Pendidikan dan Pelatihan Teknis - Pengadan Alat Keterampilan Belanja Jasa Konsultan TA.2007. II PENDIDIKAN 1 Pengembangan Pendidikan untuk Semua Pengadaan Buku - buku Perpustakaan - Perpustakaan SD - Perpustakaan SMP - Perpustakaan SMU - Perpustakaan SMK Bantuan Beasiswa - Beasiswa Anak SD ( 300 Org x 12 Bln ) - Beasiswa Anak SMP ( 200 Org x 12 Bln ) - Beasiswa Anak SMU / SMK ( 100 Org x 12 Bln )
CV. JEFRINDO CONSULT.
99,121,875 49,731,250
CV.BILLINDO CONSULT.
49,390,625
45 1 1 1
Bh Pkt Pkt Pkt
571,852,000 10,500,000 449,352,000 75,000,000 37,000,000
1
Pkt
172,500,000 172,500,000
1
Pkt
350,000,000
20 15 4 1
Pkt Pkt Pkt Pkt
17,763,440,000 12,419,000,000 625,000,000 300,000,000 225,000,000 80,000,000 20,000,000
3600 2400 1200
OB OB OB
264,000,000 108,000,000 96,000,000 60,000,000
K
CV.LUAHA GUNDE S-194/BRR-462253/IX/2006 28-Sep-06 PT.SELATAN JAYA S-190/BRR-462253/IX/2006 28-Sep-06 CV.ARIKO PRATAMA S-191/BRR-462253/IX/2006 28-Sep-06 PT.YUDHA KARYA
-
-
-
-
P P P P
13,663,698,580 10,752,274,880 -
-
Pembangunan Gedung Pendidikan Modal Gedung & Pendidikan Pembangunan Unit Gedung Baru - UGB TK KASIH BNKP Hilisimaetano
K
F
T.Dalam
231
M2
11,530,000,000 10,880,000,000 4,957,342,500 375,952,500
- UGB Sekolah Dasar Hilisalo'o
K
F
T.Dalam
482
M2
2,040,306,000 1,020,153,000
K
- UGB Sekolah Dasar Baruyu
K
F
PP.Batu
482
M2
1,020,153,000
K
- UGB SMPS Citra Sakti Hilisimaetano
K
F
T.Dalam
546
M2
1,270,542,000
P
- UGB SMUN 3 Soledua/Sisarahili
K
F
Lolowau
546
M2
1,270,542,000
K
CV.GERAK PEMBANGUNAN S-193/BRR-462253/IX/2006 28-Sep-06
Pembangunan Ruang Laboratorium - Lab. Bahasa SMK Bhati Luhur
K
F
T.Dalam
1
Ruang
1,994,848,000 104,992,000
L
CV.BAWORAI
- Lab. Bahasa SMKN 1 P. Tello
K
F
PP.Batu
1
Ruang
104,992,000
K
- Lab. Bahasa SMKN 1 Gomo
K
F
Gomo
1
Ruang
104,992,000
L
UD.SUKMA JAYA S-195/BRR-462253/IX/2006 28-Sep-06 CV. SOPHAN
3,870,880,045 1,410,124,245 -
-
4,391,370,300 342,478,000
792,101,700
1,886,195,000 938,062,000
565,858,500 281,418,600
4
948,133,000
284,439,900
0.34
4.47
1,031,481,300
4
1,131,216,000
226,243,200
13.44
2,654,758,400 92,783,900
227,640,960
92,404,200
27,721,260
43.17
94,222,000
28,266,600
15.75
20.79
No
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
1
2
K/S F/N LOKASI
VOL
SAT
3
4
5
6
7
- Lab. Bahasa SMUN 3 Bawomataluo
K
F
T.Dalam
1
Ruang
- Lab. Bahasa SMUN 2 Hilisataro
K
F
T.Dalam
1
- Lab. Bahasa SMUN 1 Lahusa
K
F
Lahusa
- Lab. Bahasa SMUN 1 Amandraya
K
- Lab. Sains SMPS Citra Hilisimaetano
Pagu DIPA 8
K/L/P
NAMA PERUSAHAAN NOMOR/TGL KONTRAK
Realisasi Keuangan
Fisik
Nilai Kontrak % 13
Ket.
(%)
9
10
104,992,000
P
CV.PUTRI
Ruang
104,992,000
L
CV.ANDIKA
1
Ruang
104,992,000
L
CV.KASIH
95,659,000
F Amandraya
1
Ruang
104,992,000
K
99,217,000
K
F
T.Dalam
1
Ruang
104,992,000
L
CV.ONODA S-196/BRR-462253/IX/2006 28-Sep-06 CV. REFORMASI
93,788,000
36.04
- Lab. Sains SMPN 1 Lolomatua
K
F
Lolomatua
1
Ruang
104,992,000
L
CV. SURYA BARU
99,117,000
1.24
- Lab. Sains SMPN 3 Lolowau
K
F
Lolowau
1
Ruang
104,992,000
K
96,431,000
38.02
- Lab. Sains SMPN 3 Gomo
K
F
Gomo
1
Ruang
104,992,000
L
CV. MARAO S-197/BRR-462253/IX/2006 28-Sep-06 CV.IDAPOLA
97,229,000
29,168,700
0
- Lab. Sains SMPN 3 Lahusa
K
F
Lahusa
1
Ruang
104,992,000
K
92,624,000
27,787,200
52
- Lab. Sains SMPN 2 Amandraya
K
F
Amandray
1
Ruang
104,992,000
L
CV.KARYA SAPUTRA S-198/BRR-462253/IX/2006 28-Sep-06 CV.TEMAN RAYA
94,403,000
28,320,900
0
- Lab. Sains SMPS BNKP Hilisimaetano
K
F
T.Dalam
1
Ruang
104,992,000
L
CV. PUTRA SELATAN
90,797,300
9.88
- Lab. Sains SMPN 2 Lolowau
K
F
Lolowau
1
Ruang
104,992,000
L
CV. HILIMEGAI
89,905,000
12.57
- Lab. Sains SMUN 3 Bawomataluo
K
F
T.Dalam
1
Ruang
104,992,000
L
CV. SAHABAT SETIA
96,685,000
0
- Lab. Sains SMUN 2 Hilisataro
K
F
T.Dalam
1
Ruang
104,992,000
P
104,000,000
0
- Lab. Sains SMUN 1 Lahusa
K
F
Lahusa
1
Ruang
104,992,000
L
CV.LOGISANORAYA
93,670,000
28,101,000
0
- Lab. Sains SMUN 1 Amandraya
K
F
Amandray
1
Ruang
104,992,000
K
CV.SAONIGEHO S-199/BRR-462253/IX/2006 28-Sep-06
95,034,000
28,510,200
35.63
Pembangunan Ruang Kelas Baru - RKB SDN Saua
K
F
T.Dalam
2
Ruang
3,927,809,500 195,200,880
L
CV. TOENE
3,706,146,180 194,677,650
390,381,585 58,403,295
9.23
- RKB SDN Botohilitano
K
F
T.Dalam
2
Ruang
195,200,880
K
181,487,400
54,446,220
9.08
- RKB SDN Sisobahili
K
F
Amandray
2
Ruang
195,200,880
K
CV.NUSA PERMAI S-200/BRR-462253/IX/2006 28-Sep-06 CV.HILIMAGAI S-201/BRR-462253/IX/2006 28-Sep-06
180,117,000
54,035,100
0
- RKB SDN Baruzo
K
F
Gomo
2
Ruang
195,200,880
P
- RKB SDN Sifaoroasi Mola
K
F
Gomo
2
Ruang
195,200,880
K
- RKB SDN Hilimbowo Idano Tae
K
F
Gomo
2
Ruang
195,200,880
K
- RKB SDN Olayama
K
F
Lolowau
2
Ruang
195,200,880
K
CV.PRIBUMI ABDI S-202/BRR-462253/IX/2006 28-Sep-06 CV.BINTANG RAYA S-205/BRR-462253/IX/2006 28-Sep-06 CV.TUNAS HARAPAN
11
( RP ) 12
103,450,000
14
17
0
933339000
0
0
29,765,100
30.00
52
194,050,000
12.82
183,511,000
0
183,894,900
186,775,000
55,168,470
8.67
10.56
No
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
1
2
K/S F/N LOKASI
VOL
SAT
Pagu DIPA 8
K/L/P
3
4
5
6
7
9
- RKB SDN Orahili
K
F
Lolomatua
2
Ruang
195,200,880
K
- RKB SDN Hilitobara
K
F
T.Dalam
2
Ruang
195,200,880
K
- RKB SDN Hilisataro
K
F
T.Dalam
2
Ruang
195,200,880
P
- RKB SMPS Bhakti Luhur
K
F
T.Dalam
2
Ruang
223,086,720
K
- RKB SMPS BNKP P.Tello
K
F
PP.Batu
2
Ruang
223,086,720
K
- RKB SMUN 1 Lolomatua
K
F
Lolomatua
2
Ruang
223,086,720
K
- RKB SMUN 3 Bawomataluo
K
F
Lolomatua
2
Ruang
223,086,720
K
- Jasa Konsultan Perencanaan - Jasa Konsultan Perencanaan
K
F
K
- Jasa Konsultan Perencanaan
K
F
K
- Jasa Konsultan Perencanaan
K
F
K
Jasa Konsultan Pengawasan
K
F
10 S-203/BRR-462253/IX/2006 28-Sep-06 CV.MAKMUR S-204/BRR-462253/IX/2006 28-Sep-06 CV.RAHMAT SAPUTRA S-206/BRR-462253/IX/2006 28-Sep-06
4. Konsultan Pengawas
5. Konsultan Pengawas
6. Konsultan Pengawas
7. Konsultan Pengawas
8. Konsultan Pengawas
9. Konsultan Pengawas
10. Konsultan Pengawas
Belanja Jasa Konsultan utk TA. 2007
11
N
1
Pkt
1,758,724,000 45,000,000
17
57,864,300
10.47
159,900,000
47,970,000
17.85
194,250,000
23.96
176,647,000
30.83
CV.OYO S-210/BRR-462253/IX/2006 28-Sep-06 CV.PUTRI S-211/BRR-462253/IX/2006 28-Sep-06
207,081,230
15.52
CV. INAMA CIPTA 032.a/BRR-PKNS/IV/2006 25-Apr-06 CV. E R G E G E 0333.a/BRR-PKNS/IV/2006 25-Apr-06 CV. TEAM ARCHIETHA 034.a/BRR-PKNS/IV/2006 25-Apr-06
208,314,000
62,494,200
640,000,000 240,000,000
640,000,000 240,000,000
100%
100 Bayar 100 %
200,000,000
200,000,000
100%
100 Bayar 100 %
200,000,000
200,000,000
100%
100 Bayar 100 %
428,760,000
90,150,000
48,650,000
14,595,000
30.00
40,050,000
12,015,000
30.00
40,750,000
12,225,000
30.00
45,850,000
13,755,000
30.00
45,850,000
13,755,000
30.00
33,450,000
10,035,000
30.00
45,900,000
13,770,000
30.00
27.43
43,010,000
-
0%
40,150,000
-
0.00
45,100,000
-
0.00
P
Ket.
14
192,881,000
650,000,000
S
Fisik (%)
% 13
CV.SICHA WIJAYA S-208/BRR-462253/IX/2006 28-Sep-06 CV.PONO INDAH S-209/BRR-462253/IX/2006 28-Sep-06
PT. GALA HONORA KONSULTANT ST.156.F/BRR-462253/IX/2006 12-Sep-06 PT. KONSULINDO CITRA ERNALA ST.156/BRR-462253/IX/2006 12-Sep-06 PT. BUMI TORAN KENCANA ST.156.D/BRR-462253/IX/2006 12-Sep-06 CV. PEMBANGUNAN BARU CONSULTAN ST.156.E/BRR-462253/IX/2006 12-Sep-06 CV. PERCA BANGUN PERSADA ST.156.A/BRR-462253/IX/2006 12-Sep-06 CV. NINTA ST.156.G/BRR-462253/IX/2006 12-Sep-06 CV. JASA PERSADA KONSULTAN ST.156.B/BRR-462253/IX/2006 12-Sep-06 CV. SUMBER ENERGI ST.169/BRR-462253/IX/2006 20-Sep-06 PT. BIRO BANGUN SELARAS ST.170/BRR-462253/IX/2006 20-Sep-06 CV. DWIWARNA KONSULTAN ST.171/BRR-462253/IX/2006 20-Sep-06
3. Konsultan Pengawas
( RP ) 12
0
430,446,820
2. Konsultan Pengawas
Realisasi Keuangan Nilai Kontrak
193,800,000
653,007,000
1. Konsultan Pengawas
2 Pengadaan Meubeler - Meubeler TK
NAMA PERUSAHAAN NOMOR/TGL KONTRAK
-
No
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
1
2 - Meubeler SD - Meubeler SMP - Meubeler SMU / SMK
K/S F/N LOKASI 3 S S S
4 N N N
5
VOL 6 1 1 1
SAT 7 Pkt Pkt Pkt
3 Monitoring dan Pengawasan Pelaksanaan Program dan Kegiatan - Honor tidak tetap - ATK Penyusunan Instrument - Cadangan - ATK Penyusunan Laporan - Penggandaan Instrument Monitoring - Konsumsi Penyusunan Instrument ( 4 Org x 5 Hr x 2 Keg ) - Transportasi Pemantauan ( 2 Org x 4Keg x 1 KL ) - Lumsum Pemantauan ( 2 Org x 3 Hr x 4 Keg )
4 Rehabilitasi Gedung - Rehab Sekolah TA 2006 - RKS SD ( 3 x 2 Lokal x 56 m2 ) - RKS SD ( 1 x 3 Lokal x 56 m2 ) - RKS SMP ( 2 x 2 Lokal x 64 m2 ) Dana Cadangan
S S S
Pagu DIPA 8 813,724,000 450,000,000 450,000,000
K/L/P 9 P P P
NAMA PERUSAHAAN NOMOR/TGL KONTRAK 10
12,864,000 2,000,000 1,000,000 324,000 1,000,000 500,000 1,800,000 960,000 5,280,000
( RP ) 12
11
-
3,572,852,000 1,395,000,000 585,602,640 292,801,320 446,173,440 70,422,600
F F F
Realisasi Keuangan
Fisik
Nilai Kontrak % 13
Ket.
(%) 14
17
-
2,271,423,700 -
1,820,755,800 -
1,638,039,000 149,166,500
1,638,039,000 149,166,500
,100%
100
197,750,000
197,750,000
30 %
32
93,256,800
93,256,800
,100%
100
184,558,500
184,558,500
,100%
100
337,085,000
337,085,000
,100%
100
197,512,000
197,512,000
,100%
100
92,472,100
92,472,100
,100%
100
143,325,000
143,325,000
,100%
100
90,636,000
90,636,000
,100%
100
152,277,100
152,277,100
,94%
94
533,384,700 99,220,100
182,716,800 -
,100%
100
,81%
81
2,177,852,000 T.Dalam
49 3
Ruang
149,166,000
K
F
T.Dalam
4
Ruang
197,750,000
K
K
F
Amandray
2
Ruang
93,256,000
4. Rehab Total SDN 071103 Hilinawalo
K
F
T.Dalam
4
Ruang
184,558,000
K
5. Rehab Total SDN 074078 Lawa - lawa
K
F
Gomo
7
Ruang
337,085,000
K
6. Rehab Total SDN 071221 Mazo
K
F
Gomo
4
Ruang
197,512,000
K
7. Rehab Berat SDN 078015 Bawasalo'o Dao 2
K
F
Lolowau
4
Ruang
92,472,000
K
8. Rehab Berat SDN 071114 Amandraya
K
F
Amandray
6
Ruang
143,325,000
K
9. Rehab Berat dan Ringan SDN 071122 Telukdalam
K
F
T.Dalam
8
Ruang
90,636,000
K
10. Rehab Berat SDN 076106 Hilisimaetano
K
F
T.Dalam
7
Ruang
156,277,000
K
. Rehab Total/Berat/Ringan Ruang Kelas SMP 11. Rehab Total & Berat SMPN 4 Lolowau
K
F
Lolowau
15 3
Ruang
99,220,000
K
12. Rehab Berat SMPN 1 Teluk Dalam
K
F
T.Dalam
5
Ruang
151,447,000
K
13. Rehab Berat SMP Swasta BNKP Teluk Dalam.
K
F
T.Dalam
4
Ruang
103,029,000
K
14. Rehab Berat SMPN 4 Gomo.
K
F
Gomo
3
Ruang
79,687,000
K
. Rehab Total/Berat/Ringan Ruang Kelas SD 1. Rehab Total SDN 071101 Bawomataluo
K
F
2. Rehab Total SDN 076727 Hilimaetaluo
K
3. Rehab Total SDN 079730 Hilimbulawa
CV.ANDIKA 370/BRR-PPN/06/07/2006 18 April 2006 CV.LAGUNDRI STAR 371/BRR-PPN/06/07/2006 18 April 2006 CV.SAONIGEHO 374/BRR-PPN/06/07/2006 18-Apr-06 CV.CARAKA KENCANA CV.UNDUT 143/BRR-PPN/06/07/2006 07 Maret 2006 CV.MUARA KASIH 379/BRR-PPN/06/07/2006 18 April 2006 CV.MUSTIKA NIAS 390/BRR-PPN/06/07/2006 18 April 2006 CV.NURLIM 394/BRR-PPN/06/07/2006 18 April 2006 CV.MITRA UTAMA 396/BRR-PPN/06/07/2006 18 April 2006 CV.CARAKA KENCANA 397/BRR-PPN/06/07/2006 18 April 2006
CV.NIAS INDAH 411/BRR-PPN/06/07/2006 18 April 2006 CV.NIAS INDAH 412/BRR-PPN/06/07/2006 18 April 2006 CV.MITRA UTAMA 413/BRR-PPN/06/07/2006 18 April 2006
CV.SEJAHTERA BERSAMA 414/BRR-PPN/06/07/2006
151,447,800
-
103,029,500
103,029,500
,86%
86
79,687,300
79,687,300
,100%
100
No
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
1
2
K/S F/N LOKASI 3
Konsultan Pengawasan
4
5
F
VOL 6
SAT 7
Pagu DIPA 8
9 102,432,000
24,565,965,000
TOTAL
K/L/P
K
NAMA PERUSAHAAN NOMOR/TGL KONTRAK 10 18 April 2006 CV.GAMMA'91 M-042/BRR-462247/V/2006 5-May-06
Realisasi Keuangan
Fisik
Nilai Kontrak 11
( RP ) 12
% 13
(%)
38
27.42
14
100,000,000
17,605,439,519
6,713,882,859
Jumlah Paket Kontrak Jumlah Paket Swakelola 19.65245
Jumlah Paket Fisik Jumlah Paket Non Fisik Teluk Dalam, 25 November 2006 Keterangan : (K / S) : (F / N) : (K / L / P ) : (K / L / P) : (K / L / P) :
K F K L P
= Kontrak, S = Swakelola = Fisik, N = Non Fisik = Terkontrak (Paket Pekerjaan Yang Sudah Diberikan SPK) = Proses Lelang (Paket Yang Sudah Melakukan Pelelangan) = Persiapan (Paket Yang Belum Melakukan Pengumuman Pelelangan)
Ket. 17
LAPORAN PELAKSANAAN KEGIATAN SATKER ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN 2006 (DANA HASIL MORATORIUM) Deputi Bidang Sub Bidang SATKER Ka SatKer
Format OC1
: Bidang Pendidikan dan Kesehatan : Dinas Kesehatan Sumut - ETESP : 437880 : FENCE LASE
Status Bulan : 25 November 2006 NAMA PERUSAHAAN
No
K/S
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
1
2
I
ADMINISTRASI UMUM
II
PEMBUATAN LEAFLET / POSTER Pengadaan Media Sekolah berupa Poster, booket, komik 1 Pengadaan Media Sekolah (Poster, Booklet, Komik) 2
3
C
D
E
F G
V
5
VOL
SAT
6
7
Pagu DIPA 8
9
Satker
318,000,000 120,000,000 60,000,000 60,000,000
PT PT
K/L/P
1 1
S S
N N
Nias Nisel
1 1
PT PT
547,680,000 56,020,000 28,010,000 28,010,000
Pelatihan Admnistrasi dan Keuangan untuk Desa Proyek 1 Pelaksanaan Pelatihan Administrasi Keuangan (Ketua TKM, Bendahara) 2 Pelaksanaan Pelatihan Administrasi Keuangan (Ketua TKM, Bendahara)
S S
N N
Nias Nisel
1 1
PT PT
58,660,000 29,330,000 29,330,000
P P
Pelatihan Kontruksi SAB Desa 1 Pelaksanaan Pelatihan Konstruksi SAB desa (Ketua, Bagian Teknis TKM) 2 Pelaksanaan Pelatihan Konstruksi SAB desa (Ketua, Bagian Teknis TKM)
S S
N N
Nias Nisel
1 1
PT PT
98,680,000 49,340,000 49,340,000
P P
Pelatihan O & M 1 Pelaksanaan Pelatihan (Ketua, Bagian Teknis TKM) 2 Pelaksanaan Pelatihan (Ketua, Bagian Teknis TKM)
S S
N N
Nias Nisel
1 1
PT PT
54,460,000 27,230,000 27,230,000
P P
Promosi Kesehatan di Sekolah 1 Promosi Kesehatan di sekolah (ORT, Kecacingan,PHBS) 2 Promosi Kesehatan di sekolah (ORT, Kecacingan,PHBS)
S S
N N
Nias Nisel
66,640,000 33,320,000 33,320,000
P P
Pelatihan Promkes untuk Bidan, posyandu dan Kader Desa 1 Pelaksanaan Pelatihan Promkes Bidan, Posyandu dan Kader Desa 2 Pelaksanaan Pelatihan Promkes Bidan, Posyandu dan Kader Desa
Penyusunan Program 1 Transport 2 Uan Saku
Peningkatan Prasarana dan Sarana Air Bersih / Limbah 1 Pengadaan ATK 2 Langganan LTGA 3 Sewa Kendaraan Roda-4 4 Sewa Kantor 5 Sewa Notebook 6 Sewa PC 7 Bantuan Langsung (Bangunan / Konstruksi air minum pedesaan) 8 Bantuan Langsung (Bangunan / Konstruksi air minum pedesaan)
11
S S
N N
Nias Nisel
1 1
P P
P P P
P P
N N
Satker Satker
27 27
OR OR
S S
N N
Satker Satker
9 27
OT OH
28,350,000 27,000,000 1,350,000
S S K K K K K K
F N F F F F F F
Satker Satker Satker Satker Satker Satker Nias Nisel
6 9 6 6 150 150 17 17
OB BLn BLn BLn Hr Hr Desa Desa
6,963,000,000 9,000,000 27,000,000 72,000,000 30,000,000 16,500,000 8,500,000 3,400,000,000 3,400,000,000
7,986,480,000
Jumlah Paket Fisik Jumlah Paket Non Fisik
= Kontrak, S = Swakelola = Fisik, N = Non Fisik = Terkontrak (Paket Pekerjaan Yang Sudah Diberikan SPK) = Proses Lelang (Paket Yang Sudah Melakukan Pelelangan) = Persiapan (Paket Yang Belum Melakukan Pengumuman Pelelangan
Fisik % 15
181,950,000
Ket.
(%) 16
17
100% 100%
Real.keu.dlm proses Real.keu.dlm proses
100%
Real.keu.dlm proses
100%
Real.keu.dlm proses
57,21%
-
-
120,000,000 60,000,000 60,000,000
S S
( RP ) 14
-
Pkt Pkt
37,800,000 9,450,000 8,100,000 1,350,000
Realisasi Keuangan
Fisik 13
P P
-
-
93,220,000
TOTAL Jumlah Paket Kontrak Jumlah Paket Swakelola
Keterangan : (K / S) : K (F / N) : F (K / L / P ) : K (K / L / P) : L (K / L / P) : P
10
Rencana (%) Keu 12
Nilai Kontrak
-
Nias Nisel
Pelatihan Promosi Kesehatan untuk uru Sekolah
NOMOR/TGL KONTRAK
181,950,000
F F
IV Penyusunan Program dan Rencana Kerja / Teknis / Program Belanja Sewa A 1 Akomondasi 2 Komsumsi B
4
LOKASI
K K
III Pendidikan dan Pelatihan Teknis Deseminasi A 2 Pelaksanaan Diseminasi 3 Pelaksanaan Diseminasi B
F/N
-
-
-
-
-
-
-
-
-
-
-
-
30%
Real.keu.dlm proses
-
-
40%
Real.keu.dlm proses
30% 40% 100 100
Real.keu.dlm proses Real.keu.dlm proses
2,333,623,000 P P CV. Gading Asia Mas Drs. Yosafati Hia P P P P
72,000,000 30,000,000
72,000,000 30,000,000
100% 100%
1,138,007,000 1,093,616,000
Dlm proses RKM Dlm proses RKM
2,333,623,000
% REALISASI thdp DIPA
Keterangan V.7&8 : Proses kontrak (RKM) dng, masyarakat di Kab. Nias Selatan sebanyak ( 3 desa) sebesar : Proses kontrak (RKM) dng, masyarakat di Kab. Nias sebanyak ( 5 desa) sebesar :
283,950,000
1.27716
Rp. 1.093.616.000,-
Rp. 1.138.007.000,Rp. 2.231.623.000,-
12.17
4.37
LAPORAN PELAKSANAAN KEGIATAN SATKER ANGGARAN REHABILITASI DAN REKONSTRUKSI NAD-NIAS APBN 2006 (DANA HASIL MORATORIUM) Deputi Bidang
: Bidang Sekretariat,Perwakilan Nias ,Keuangan,Komunikasi dan Informasi
` Status Bulan : 23 November 2006
PROYEK / BAGIAN PROYEK KEGIATAN PAKET
K/S
F/N
LOKASI VOL
SAT
Pagu DIPA
K/L/P
NO 2
3
4
5
6
7
1 ADMINISTRASI UMUM Administrasi Umum - Belanja Uang Honor Tidak Tetap - Belanja Keperluan Sehari-hari Perkantoran - Belanja Barang Operasional Lainnya - Belanja Barang Non Operasional Lainnya - Belanja Langganan Daya dan Jasa - Belanja Sewa - Belanja Jasa Lainnya - Belanja Biaya Pemeliharaan Peralatan dan Mesin - Belanja Perjalanan Lainnya - Belanja Modal Peralatan dan Mesin - Belanja Jasa Konsultan 2 Pembinaan /Koordinasi dan Konsultasi Pengawasan - Belanja Uang Honor Tidak Tetap [Jasa konsultan Individual]
3
8
9
- Belanja Perjalanan tetap
162,000,000
- Belanja Modal Peralatan dan Mesin
250,000,000
Pembangunan Gedung Kantor - Belanja Modal Gedung dan Bangunan - Pembangunan gedung Kantor BRR - Nias ( Lanjutan )
- Pengawasan gedung Kantor BRR - Nias ( Lanjutan )
5
Perawatan Gedung Kantor - Belanja Biaya Pemeliharaan Gedung dan Bangunan Lainnya - Perawatan Gedung Kantor
10
9,870,200,000 1,656,200,000 230,000,000 181,000,000 82,000,000 156,000,000 6,150,000,000 290,000,000 132,500,000 636,500,000 6,000,000 350,000,000 1,132,000,000 720,000,000
Nilai Kontrak
Realisasi Keuangan
11
( RP ) 14
9,870,200,000 1,656,200,000 230,000,000 181,000,000 82,000,000 156,000,000 6,150,000,000 290,000,000 132,500,000 636,500,000 6,000,000 350,000,000
F
G.Sitoli
200
m2
945,000,000
K
N
1
Pkt
75,000,000
435,000,000
Rencana
% 15 27
359,237,301 242,533,950
32 34 72 -
776,500,000
898,813,000
88
CV.Moro'o 262/BRR-N/VI/2006 14 Juni 2006
740,000,000
703,000,000
95
CV.Tricone Engineering 262a/BRR/N/VI/2006 14 Juni 2006
36,500,000
32,850,000
90 Rp 4,838,114,266
CV.Moro'o 121b/BRR-N/II/2006 13 Februari 2006
151,620,000
CV.Tricone Engineering 121a/BRR/N/VI/2006 13 Februari 2006
11,343,000
CV.Moro'o 154a/BRR-N/SPK/2006 24-Apr-06
4,421,785,863
Rp
39,001,000
39,001,000
8.97
39,001,000
39.00
1000
m2
100,000,000
- Pemeliharaan Gedung kantor/pagar dan taman
500
m2
185,000,000
-
- Pemeliharaan Halaman Kantor
1500
m2
150,000,000
-
1
pkt
175,000,000
Pengadaan Meubeler - Belanja Modal Peralatan dan Mesin - Pengadaan Meubelair, Interior dan dekorasi (Kantor baru)
309,900,000
- Pengadaan Alat Olahraga - Pengadaan Filing Cabinet
2 8
set bh
25,000,000 12,000,000
- Pengadaan Meja kerja 16 buah - Pengadaan Meja dan Kursi lipat - Pengadaan Kursi Kerja - Pengadaan Kursi Lipat - Pengadaan Lemari Arsip - Pengadaan Mesin Fax
16 4 12 40 4 1
bh set bh bh bh bh
20,000,000 40,000,000 4,200,000 10,000,000 6,000,000 3,000,000
Sisa Anggaran 17
2,691,540,598 543,205,400 189,579,493 215,243,741 81,821,500 65,273,294 1,085,365,264 56,205,700 35,658,250 419,187,956 -
-
1,020,000,000 K
Est Penyerapan S / D 31 Des 2006
116,703,351
K
4
NAMA PERUSAHAAN NOMOR/TGL KONTRAK
335,030,700 CV. Asian Utama 531/BRR-N/SPK/2006 11 September 2006 CV. Ganumba 547/BRR-NSPK/2006 04 Oktober 2006
49,956,500
PT. Logikreasi Utama Medan 268A/BRR-N/SPK/2006 20 Juni 2006
59,400,000
CV. Usaha Terang 290/BRR-N/SPK/2006 05 Juli 2006 [Pengadaan Inventaris]
47,520,000 15,000,000
49,634,200
108
416,328,403
- Pengadaan White Board - Pengadaan Penyulingan Air Minum - Pengadaan AC Split
2 2 16
Pengadaan Alat Pengolahan Data - Belanja Modal dan Peralatan dan Mesin - Pengadaan Komputer, Printer, dan UPS - Pengadaan Kamera Digital - Pengadaan Handy Cam - Pengadaan In-Focus Projector - Pengadaan Note Book - Pengadaan Mesin Foto Copy - Pengadaan Printer A4 - Pengadaan Printer A3 Color Hp - Pengadaan Printer utk kantor distrik - Pengadaan AC Split utk kantor - Pengadaan penyulingan Air minum
K
Pengadaan Kendaraan - Belanja Modal Peralatan dan Mesin - Pengadaan Kendaraan Roda 2
K
N
1
bh bh bh
Pkt
5,100,000 7,500,000 2,100,000
843,500,000 180,000,000 40,000,000 15,000,000 20,000,000 200,000,000 100,000,000 36,000,000 98,000,000 24,000,000 115,500,000 15,000,000
N
4
Unit
6
CV. Asian Utama 137/BRR-N/SPK/2006 03 April 2006 [2 unit AC] CV.Gading Asia Mas 546a/BRR-N/SPK/2006 09 Oktober 2006 [6 unit AC] CV. Moi Mulia Perkasa 619a/BRR-N/SPK/2006 12 Oktober 2006 [6 unit AC]
CV.Gading Asia Mas 321/BRR-N/SPK/2006 3 Juli 2006 PT.Logikreasi Utama 386/BRR-N/SPK/2006 18 Juli 2006 PT.Logikreasi Utama 428/BRR-N/SPK/2006 3 Agustus 2006 CV. Pelita Jaya 602/BRR-N/SPK/2006 2-Nov-06
3
-Pengadaan Genset/Generator
2
108,000,000
unit
49,500,000 49,500,000
295,400,000 98,000,000
262,325,000 98,000,000
31
66,000,000
66,000,000
72,000,000
72,000,000
59,400,000
26,325,000
108,000,000 72,000,000
108,000,000 72,000,000
100
36,000,000
36,000,000
100
1,168,000,000
CV.Putra Exos 191/BRR-N/SPK/2006 8 Mei 2006 CV.Putra Exos 1011/BRR-N/SPK/2006 30 Agustus 2006 -Pengadaan kendaraan roda 4
14,520,000
900,000,000 160,000,000
Pemantauan dan Evaluasi - Belanja Barang dan Barang Operasional lainnya - Belanja Perjalanan Biasa
168,000,000 63,000,000 105,000,000
85,889,000
51
85,889,000
82
103,315,500 68,642,500
8
PEMBINAAN INFORMASI PUBLIK Optimalisasi Jaringan Informasi dan Komunikasi Penanggulangan Bencana - Belanja Barang Operasional lainnya
####
Exp
1,334,000,000 109,000,000
37,600,000 37,600,000 CV. Prima Jaya 392/BRR-N/SPK/2006 2 Juli 2006
- Belanja Jasa lainnya - Belanja Bantuan Langsung (Block Grant) Sekolah/Lembaga/Guru
PEMBINAAN ADMINISTRASI DAN PENGELOLAAN KEUANGAN Pembinaan Administrasi dan Pengelolaan Keuangan - Belanja Uang Honor Tidak Tetap
125,000,000
34,673,000
1,100,000,000
-
834,000,000 834,000,000
-
17,114,600,000
-
144,166,667 144,166,667
11,126,701,000
5,027,318,766
%R.FISIK tdp DIPA %R.FISIK
Keterangan : (K / S) : (F / N) : (K / L / P ) : (K / L / P) : (K / L / P) :
K = Kontrak, S = Swakelola F = Fisik, N = Non Fisik K = Terkontrak (Paket Pekerjaan Yang Sudah Diberikan SPK) L = Proses Lelang (Paket Yang Sudah Melakukan Pelelangan) P = Persiapan (Paket Yang Belum Melakukan Pengumuman Pelelangan
28 -
17
29.37 29.37445 45.18247
OFF BUDGET SUMMARY As of December 01, 2006
DISTRICT
COMMITTED
NIAS DISTRICT SOUTH NIAS DISTRICT TOTAL
DISBURSED
116,405,831
44,888,745
39,215,188
14,288,059
155,621,019
59,176,804
140,000,000
BUDGET (USD)
120,000,000 100,000,000 80,000,000
COMMITTED
60,000,000
DISBURSED
40,000,000 20,000,000 0 NIAS DISTRICT
SOUTH NIAS DISTRICT DISTRICT
SUMBER BUDGET TERBESAR
NO
Sumber Budget
Disbursed (USD)
Committed (USD)
1
INTERNATIONAL NGO's
71,655,390
27,706,266
2
UNITED NATIONS
37,404,479
18,221,018
3
MULTILATERAL
19,190,947
6,489,918
4
BILATERAL
10,131,136
3,876,640
5
GOVERNMENT INSTITUTION
8,555,549
298,696
6
LOCAL NGO'S
8,683,518
2,584,266
59,176,804
155,621,019
TOTAL
DISBURSED TERBESAR
COMMITTED TERBESAR
NO
Sumber Budget
Committed (USD)
NO
Sumber Budget
Disbursed (USD)
1
INTERNATIONAL NGO's
71,655,390
1
INTERNATIONAL NGO's
27,706,266
2
UNITED NATIONS
37,404,479
2
UNITED NATIONS
18,221,018
3
MULTILATERAL
19,190,947
3
MULTILATERAL
6,489,918
4
BILATERAL
10,131,136
4
BILATERAL
3,876,640
5
LOCAL NGO'S
8,683,518
5
LOCAL NGO'S
2,584,266
6
GOVERNMENT INSTITUTION
8,555,549
6
GOVERNMENT INSTITUTION
TOTAL
155,621,019
TOTAL
298,696
59,176,804
SUMBER BUDGET TERBESAR
NO
Sumber Budget
Committed (USD)
Disbursed (USD)
1
INTERNATIONAL NGO's
71,655,390
27,706,266
2
UNITED NATIONS
37,404,479
18,221,018
3
MULTILATERAL
19,190,947
6,489,918
4
BILATERAL
10,131,136
3,876,640
6
GOVERNMENT INSTITUTION
8,555,549
298,696
5
LOCAL NGO'S
8,683,518
2,584,266
155,621,019
TOTAL
59,176,804
80,000,000 70,000,000 60,000,000
USD
50,000,000 40,000,000 30,000,000 20,000,000 10,000,000 0
INTERNATIONAL NGO's
UNITED NATIONS
MULTILATERAL
BILATERAL
GOVERNMENT INSTITUTION
LOCAL NGO'S
Committed(USD)
71,655,390
37,404,479
19,190,947
10,131,136
8,555,549
8,683,518
Disbursed(USD)
27,706,266
18,221,018
6,489,918
3,876,640
298,696
2,584,266
Sumber Budget
COMMITTED TERBESAR
NO
Committed (USD)
Sumber Budget
1
INTERNATIONAL NGO's
71,655,390
2
UNITED NATIONS
37,404,479
3
MULTILATERAL
19,190,947
4
BILATERAL
10,131,136
5
LOCAL NGO'S
8,683,518
6
GOVERNMENT INSTITUTION
8,555,549
155,621,019
TOTAL
6%
5%
7%
46%
12%
24%
INTERNATIONAL NGO's
UNITED NATIONS
MULTILATERAL
BILATERAL
LOCAL NGO'S
GOVERNMENT INSTITUTION
DISBURSED TERBESAR
NO
Sumber Budget
Disbursed (USD)
1
INTERNATIONAL NGO's
27,706,266
2
UNITED NATIONS
18,221,018
3
MULTILATERAL
6,489,918
4
BILATERAL
3,876,640
5
LOCAL NGO'S
2,584,266
6
GOVERNMENT INSTITUTION
298,696
59,176,804
TOTAL
7%
4%1%
11% 46%
31% INTERNATIONAL NGO's
UNITED NATIONS
MULTILATERAL
BILATERAL
LOCAL NGO'S
GOVERNMENT INSTITUTION
10 ORGANISASI COMMITTED TERBESAR
NO
ORGANIZATION
COMMITTED (USD)
1
Canadian Red Cross
17,500,000
2
UNICEF
16,640,963
3
UNHCR
12,900,000
4
WORLD VISION
12,082,000
5
ACH
7,688,203
6
Asian Development Bank
6,708,000
7
Istituto Agronomico per l'Oltremare;
5,812,572
8
OXFAM
3,949,857
9
FAO (Food Agriculture Organization);
3,600,000
10
AMDA
2,941,833
4%
3%
4%
20%
6%
7%
20%
9%
13% 14%
Canadian Red Cross
UNICEF
UNHCR
WORLD VISION
ACH
Asian Development Bank
Istituto Agronomico per l'Oltremare;
OXFAM
FAO (Food Agriculture Organization);
AMDA
10 ORGANISASI DISBURSED TERBESAR
NO
ORGANIZATION
DISBURSED (USD)
1
UNHCR
12,900,000
2
World Vision;
9,957,000
3
OXFAM;
3,703,571
4
IFRC (International Federation of Red Cross & Red Crescent Societies);
2,576,000
5
ILO (International Labour Organization);
2,570,982
6
United Diversity Forum
1,851,852
7
ZTOF ( Zero to One Foundation )
1,500,000
8
ACTED (Agency for Technical Cooperation and Development);
1,303,798
9
YTBI (Yayasan Tanggul Bencana di Indonesia);
1,215,275
10
CWS
827,334
5%
5% 3%
6% 39% 7%
10% 10%
15%
UNHCR World Vision; OXFAM; IFRC (International Federation of Red Cross & Red Crescent Societies); ILO (International Labour Organization); United Diversity Forum ZTOF ( Zero to One Foundation ) ACTED (Agency for Technical Cooperation and Development); YTBI (Yayasan Tanggul Bencana di Indonesia);
PROGRESS SUMMARY OF NON GOVERNMENT ORGANIZATIONS IN NIAS ISLAND As of December 01, 2006
DISTRICT NIAS DISTRICT SOUTH NIAS DISTRICT TOTAL
PROJECT
IMPLEMENTING PARTNER
DESIGN
ONGOING
COMPLETE
SUSPENDED
PROCUREMENT
104
88
5
64
31
0
0
41
37
2
28
8
0
0
145
125
7
92
39
0
0
IMPLEMENTER PARTNER IN NIAS ISLAND TOTAL IMPLEMENTER PARTNER : 64
I. UNITED NATIONS NO
IMPLEMENTER PARTNER
1
FAO (Food Agriculture Organization);
2
ILO (International Labour Organization);
3
IOM (International Organization of Migration);
4
UNDP;
5
UN-HABITAT;
6
UNHCR;
7
UNICEF;
8
UNIDO (United Nations Industrial Development Organization);
II. INTERNATIONAL NGO NO
IMPLEMENTER PARTNER
1
ACE (Association for Community Empowerment);
2
ACTED (Agency for Technical Cooperation and Development);
3
ADB ( Asian Development Bank );
4
AMDA (Association of Medical Doctors of Asia);
5
Canadian International Development Agency (CIDA);
6
Canadian Red Cross;
7
Caritas Sibolga;
8
CWS (Church World Service);
9
Diocese;
10 FHI (Food for The Hungry International); 11 French Red Cross; 12
GTZ (Deutsche Gesellschaft für Technische Zusammenarbeit - German Technical Cooperation) / KfW (Kreditanstalt für Wiederaufbau - German Financial Cooperation);
13 Helen Keller International; 14 Help e.V. - Hilfe zur Selbsthilfe; 15 IFRC (International Federation of Red Cross & Red Crescent Societies);
NO
IMPLEMENTER PARTNER
16 IMC (International Medical Corps); 17 International AID; 18 Istituto Agronomico per l'Oltremare; 19 JICS; 20 Johanniter-International Assistance / The Johanniter 21 LAZARUS HILFSWERK; 22 Mercy Malaysia; 23 Ministry of Health/ADB; Canadian International Development Agency (CIDA) 24 OXFAM; 25 PUM (Netherlands Senior Experts); 26 SAB-SAS; 27 Samaritan's Purse; 28 Solidarites; 29 Soluziona S.A; 30 Swisscontact; 31 Tearfund UK; 32 The Saudi Charity Campaign; 33 TNO Built Environment and Geosciences; 34 Tomorrow’s Hope; 35 Tuscany Region; 36 United Diversity Forum; 37 Wetlands International- Indonesia / NOVIB 38 WISH (Water Initiative for Securing Health); 39 World Harvest; 40 World Vision; 41 YEU (YAKKUM Emergency Unit); 42 ZTOF (Zero to One Foundation);
III. NATIONAL NGO NO
IMPLEMENTER PARTNER
1
ACH (Aceh Concern on Humanity);
2
FKP-Indonesia (Forum Kemanusiaan & Persaudaraan Indonesia);
3
KOTIB NAD-SUMUT/ Dina Kartika Sari;
4
LPAM-Nias (Lembaga Pencerahan & Advokasi Masyarakat - Nias);
5
Pelmas BNKP;
6
Perkumpulan Keluarga Berencana Indonesia;
7
PESADA;
8
PKPA (Pusat Kajian dan Perlindungan Anak)/Christian Aid; ILO (International Labour Organization); KNH (Kindernothilfe)
9
PUSAKA;
10 Yayasan Holi'ana'a; 11 Yayasan Sheikh Eid Bin Mohammad Al Thani; 12 Yayasan Solidaritas Sesama Indonesia; 13 YPFP (Yayasan Pelayanan Fajar Harapan); 14 YTBI (Yayasan Tanggul Bencana di Indonesia);
REPORT OFF BUDGET OF REHABILITATION & RECONSTRUCTION PROJECT IN NIAS DISTRICT As of December 01, 2006
SUMMARY : Total of Budget Commitment
: USD
116,405,831
Total of Budget Disbursed
: USD
44,888,745
Sector Date Total of Project Total of Organization Total of Commitment Total of Disbursed
: : : : : :
Infrastructure,Housing & Land December 01, 2006 37 31 USD 65,725,793 USD 27,613,276
Organization
NO 1
LPAM-Nias (Lembaga Pencerahan & Advokasi Masyarakat - Nias);
2
Committed (USD)
Disbursed (USD)
55,000
55,000
CWS (Church World Service);
277,334
277,334
3
CWS (Church World Service);
878,906
550,000
4
Help e.V. - Hilfe zur Selbsthilfe;
22,785
22,785
5
World Vision;
2,500,000
2,500,000
6
YEU (YAKKUM Emergency Unit);
5,198
5,774
7
Yayasan Holi'ana'a;
394,960
394,960
8
TNO Built Environment and Geosciences;
617,284
0
9
UN-HABITAT;
639,463
476,019
10
Soluziona S.A;
379,747
0
11
YEU (YAKKUM Emergency Unit);
956,852
1,890
12
United Diversity Forum;
1,851,852
1,851,852
13
Samaritan's Purse;
35,588
3,862
14
ZTOF (Zero to One Foundation);
1,500,000
1,500,000
15
UNDP;
600,029
600,029
16
AMDA (Association of Medical Doctors of Asia);
1,061,833
862,949
17
BRR SATKER - 464862 - SEKRETARIAT, KEUANGAN, KOMUNIKASI DAN INFORMASI; Canadian Red Cross;
17,500,000
163,402
18
Caritas Sibolga;
300,000
300,000
19
ACH (Aceh Concern on Humanity); BRR (Badan Rehabilitasi dan Rekonstruksi);
2,500,000
0
20
World Harvest;
15,000
15,000
21
OXFAM;
3,949,857
3,703,571
22
UNHCR;
5,550,000
5,550,000
23
IFRC (International Federation of Red Cross & Red Crescent Societies);
2,576,000
2,576,000
24
Wish ( Water Initiative for Securing Health )
47,762
47,762
25
ACH (Aceh Concern on Humanity); BRR (Badan Rehabilitasi dan Rekonstruksi);
8,703
0
26
Solidarites;
132,000
0
27
UNICEF;
1,599,167
0
28
Caritas Sibolga;
987,655
5,136
29
ACTED (Agency for Technical Cooperation and Development);
1,303,798
1,303,798
30
SAB-SAS;
1,358,025
123,457
31
ACTED (Agency for Technical Cooperation and Development);
651,899
0
32
AMDA (Association of Medical Doctors of Asia);
1,880,000
0
33
FHI (Food for The Hungry International);
3,000
3,000
34
YTBI (Yayasan Tanggul Bencana di Indonesia);
595,350
336,787
35
Ministry of Health/ADB; Canadian International Development Agency (CIDA)
3,376,101
3,375,000
36
ADB ( Asian Development Bank )
6,708,000
0
Organization
NO 37
Diocese;
38
Committed (USD)
Disbursed (USD)
1,898,736
0
Caritas Sibolga/Caritas Italy; IFRC (International Federation of Red Cross and Red Crescent
171,721
171,721
39
Help e.V. - Hilfe zur Selbsthilfe/ADH (Aktion Deutschland Hilft); ADRA (Adventist Development and Relief Agency) - Australia
638,338
638,338
40
Yayasan Holi'ana'a/Heks - Swiss
194,850
194,850
65,722,793
27,610,276
Sector Date Total of Project Total of Organization Total of Commitment Total of Disbursed
: : : : : :
Economy December 01, 2006 20 18 USD 13,890,593 USD 3,258,401 Organization
NO 1
IOM (International Organization of Migration);
2
YEU (YAKKUM Emergency Unit);
3
Perkumpulan Keluarga Berencana Indonesia;
4
Swisscontact;
5
ACE (Association for Community Empowerment);
6
FAO (Food Agriculture Organization);
7
Yayasan Solidaritas Sesama Indonesia;
8
Istituto Agronomico per l'Oltremare;
9
PUM (Netherlands Senior Experts);
10
Pelmas BNKP;
11
JICS;
12
Committed (USD)
Disbursed (USD)
148,696
148,696
21,879
20,413
106,492
106,492
2,935,107
634,921
158,926
62,145
1,800,000
0
166,670
0
2,906,286
20,000
175,000
160,714
149.58
0
7,156
7,156
ILO (International Labour Organization);
1,594,000
1,594,000
13
ILO (International Labour Organization);
68,113
68,113
14
French Red Cross;
189,873
0
15
ILO (International Labour Organization);
200,000
200,000
16
YTBI (Yayasan Tanggul Bencana di Indonesia);
426,748
235,751
17
Ministry of Settlement and Regional Infrastructure;
708,572
0
18
BRR SATKER - 459011 - PEMBINAAN TEKNIS PERUMAHAN INFRASTRUKTUR DAN PENATAGUNAAN LAHAN NAD DAN NIAS; Ministry of Agriculture (MOA);
375,325
0
19
Ministry of Marine Affairs and Fisheries (MMAF);
1,868,600
0
20
Wetlands International- Indonesia / OXFAM
33,000
0
13,890,593
3,258,401
Sector Date Total of Project Total of Organization Total of Commitment Total of Disbursed
: : : : : :
Education December 01, 2006 13 11 USD 23,600,589 USD 10,318,568 Organization
NO
Committed (USD)
Disbursed (USD)
1
French Red Cross;
993,671
0
2
YTBI (Yayasan Tanggul Bencana di Indonesia);
975,423
492,400
3
LAZARUS HILFSWERK;
52,490
52,490
4
LAZARUS HILFSWERK;
54,500
54,500
5
Johanniter - International Assistance;
247,000
0
6
World Vision;
9,500,000
7,375,000
7
PKPA (Pusat Kajian dan Perlindungan Anak)/Christian Aid; ILO (International Labour Organization); KNH (Kindernothilfe)
639,797
116,411
8
Tuscany Region;
924,051
0
9
UNICEF;
440,496
440,496
10
UNICEF;
6,285,714
0
11
KfW; PEM GmbH Duesseldorf Germany;
1,625,000
481,481
12
Tomorrow’s Hope;
852,941
700,000
13
GTZ (Deutsche Gesellschaft für Technische Zusammenarbeit - German Technical Cooperation); KfW (Kreditanstalt für Wiederaufbau - German Financial Cooperation);
1,009,506
605,790
23,600,589
10,318,568
Sector Date Total of Project Total of Organization Total of Commitment Total of Disbursed
: : : : : :
Health December 01, 2006 13 11 USD 6,497,362 USD 1,724,903 Organization
NO 1
Tearfund UK;
2
Committed (USD)
Disbursed (USD)
1,486,101
0
YEU (YAKKUM Emergency Unit);
101,925
106,244
3
YEU (YAKKUM Emergency Unit);
117,600
5,521
4
YTBI (Yayasan Tanggul Bencana di Indonesia);
609,640
33,856
5
YPFP (Yayasan Pelayanan Fajar Harapan);
14,400
14,400
6
PESADA;
140,859
0
7
IMC (International Medical Corps);
645,749
645,749
8
Mercy Malaysia;
90,000
90,000
9
Mercy Malaysia;
90,000
0
10
ACH (Aceh Concern on Humanity); BRR (Badan Rehabilitasi dan Rekonstruksi); Mercy Malaysia;
2,500,000
150,000
11
International AID;
300,000
300,000
12
Helen Keller International;
257,338
235,383
13
Johanniter-International Assistance / The Johanniter
143,750
143,750
6,497,362
1,724,903
Sector Date Total of Project Total of Organization Total of Commitment Total of Disbursed
: : : : : :
Social December 01, 2006 12 11 USD 3,542,307 USD 1,412,242 Organization
NO 1
ACH (Aceh Concern on Humanity); BRR (Badan Rehabilitasi dan Rekonstruksi); The Saudi Charity Campaign;
2
ACH (Aceh Concern on Humanity); BRR (Badan Rehabilitasi dan Rekonstruksi);
3
World Vision;
4
UNICEF;
5
Committed (USD)
Disbursed (USD)
32,000
32,000
100,000
0
82,000
82,000
1,589,375
0
FKP-Indonesia (Forum Kemanusiaan & Persaudaraan Indonesia);
31,594
11,000
6
KOTIB NAD-SUMUT/ Dina Kartika Sari;
61,175
15,746
7
PUSAKA;
54,000
20,250
8
Helping Hands Foundation;
3,051
291
9
Yayasan Sheikh Eid Bin Mohammad Al Thani;
10,000
10,000
10
UNHCR;
900,000
900,000
11
YTBI (Yayasan Tanggul Bencana di Indonesia);
487,712
46,368
12
HelpAge International;
191,400
294,587
3,542,307
1,412,242
Sector Date Total of Project Total of Organization Total of Commitment Total of Disbursed
: : : : : :
Institution December 01, 2006 5 5 USD 3,152,187 USD 564,355 Organization
NO
Committed (USD)
Disbursed (USD)
1
UNDP;
198,920
99,518
2
YTBI (Yayasan Tanggul Bencana di Indonesia);
100,000
56,570
3
UNIDO (United Nations Industrial Development Organization);
325,000
325,000
4
LAZARUS HILFSWERK;
83,267
83,267
5
Ministry for Development of Disadvantaged Areas;
2,445,000
0
3,152,187
564,355
REPORT OFF BUDGET OF REHABILITATION & RECONSTRUCTION PROJECT IN SOUTH NIAS DISTRICT As of December 01, 2006
SUMMARY : Total of Budget Commitment
:
USD
39,215,188
Total of Budget Disbursed
:
USD
14,288,059
Sector Date Total of Project Total of Organization Total of Commitment Total of Disbursed
: : : : : :
Infrastructure,Housing & Land December 01, 2006 12 12 USD 19,510,377 USD 9,729,523 Organization
NO
Committed (USD)
Disbursed (USD)
1
LPAM-Nias (Lembaga Pencerahan & Advokasi Masyarakat - Nias);
864,400
576,000
2
TNO Built Environment and Geosciences;
617,284
0
3
UN-HABITAT;
366,238
283,775
4
ACH (Aceh Concern on Humanity); BRR (Badan Rehabilitasi dan Rekonstruksi);
2,500,000
0
5
World Harvest;
15,000
15,000
6
UNHCR;
5,550,000
5,550,000
7
Caritas Sibolga;
15,271
0
8
WISH (Water Initiative for Securing Health);
11,940
11,940
9
Kerkinactie-Holland;
617,284
43,210
10
PMI (Palang Merah Indonesia - Indonesian Red Cross);
4,095,376
0
11
SAB-SAS;
1,481,482
134,680
12
Ministry of Health / ADB;
3,376,102
3,114,918
19,510,377
9,729,523
Sector Date Total of Project Total of Organization Total of Commitment Total of Disbursed
: : : : : :
Economy December 01, 2006 10 9 USD 7,090,661 USD 1,170,207
NO
Organization
1
ACE (Association for Community Empowerment);
2
Istituto Agronomico per l'Oltremare;
3
Committed (USD)
Disbursed (USD)
87,811
39,702
2,906,286
20,000
PUM (Netherlands Senior Experts);
380,000
206,340
4
ICMC (International Catholic Migration Commission );
854,834
195,296
5
ILO (International Labour Organization);
1,284,000
458,856
6
ILO (International Labour Organization);
278,833
250,013
7
Ministry of Settlement and Regional
708,572
0
8
Earthquake & Tsunami emergency Support Project (ETESP) Agriculture Component
375,325
0
9
Wetlands International- Indonesia / OXFAM
5,000
0
10
UNDP/UN Flash Appeal
210,000
0
7,090,661
1,170,207
Sector Date Total of Project Total of Organization Total of Commitment Total of Disbursed
: : : : : :
Education December 01, 2006 8 7 USD 9,985,108 USD 1,917,229 Organization
NO
Committed (USD)
Disbursed (USD)
1
Caritas Sibolga;
213,793
175,309
2
PKPA (Pusat Kajian dan Perlindungan Anak);
201,606
52,674
3
Yayasan Bina Mandiri Indonesia;
11,864
11,864
4
UNICEF;
440,496
440,496
5
UNICEF;
6,285,715
0
6
KfW; PEM GmbH Duesseldorf Germany;
1,750,000
518,519
7
Rehabilitation and Reconstruction of Senior Secondary Vocational Schools (SMK)
837,778
595,267
8
Program penanggulangan bencana gempa bumi dan tsunami Aceh dan Nias
243,856
123,100
9,985,108
1,917,229
Sector Date Total of Project Total of Organization Total of Commitment Total of Disbursed
: : : : : :
Health December 01, 2006 5 5 USD 1,138,766 USD 472,854 Organization
NO
Committed (USD)
Disbursed (USD)
1
PESADA;
140,858
0
2
GBI Medan; MAP International;
503,100
0
3
LDSC (Latter-Day Saint Charities);
93,725
93,725
4
Helen Keller International
257,333
235,379
5
Johanniter-International Assistance / The Johanniter
143,750
143,750
1,138,766
472,854
Sector Date Total of Project Total of Organization Total of Commitment Total of Disbursed
: : : : : :
Social December 01, 2006 3 3 USD 1,191,356 USD 913,543 Organization
NO 1
ACH (Aceh Concern on Humanity); BRR (Badan Rehabilitasi dan Rekonstruksi);
2 3
Committed (USD)
Disbursed (USD)
47,500
0
YTBI (Yayasan Tanggul Bencana di Indonesia);
243,856
13,543
UNHCR;
900,000
900,000
1,191,356
913,543
Sector Date Total of Project Total of Organization Total of Commitment Total of Disbursed
: : : : : :
Institution December 01, 2006 2 1 USD 298,920 USD 84,703 Organization
NO
Committed (USD)
Disbursed (USD)
1
UNDP
198,920
84,703
2
UNDP
100,000
0
298,920
84,703
PROGRESS REPORT OF NON GOVERMENT ORGANIZATIONS IN NIAS DISTRICT As of December 01, 2006
SUMMARY : Total of Project
:
103
Total of Implementer Partner in Nias
:
88
Project Status Design
:
5
Ongoing
:
64
Completed
:
30
Suspended
:
0
Procurement
:
0
Sector Date Total of Project Total of Organization
NO
1
2
3
4
5
Project
: Infrastructure,Housing & Land : December 01, 2006 : 40 : 31
Kecamatan
Desa/Village
Project Title
:2 : 24 : 10 :0
Sector
Partner (1st Level)
ALASA;
OMBOLATA
School and House Reconstruction
Education; Infrastructure, Housing & Land
GUNUNG SITOLI MANDREHE SIROMBO
MADULA LASARA BAGAWU SIROMBU
Nias Emergency And Recovery Program – Cws Indonesia
Health ; Infrastructure, CWS (Church World Housing & Land Service);
INFRA 103 LN
LPAM-Nias (Lembaga Pencerahan & Advokasi Masyarakat - Nias);
Start Date
End Date
GUNUNG SITOLI;
LOLOMBOLI ; MADULA;
SIROMBO
FADORO;TOGIDEU; TUGALA
BUILD A VILLAGE IN NIAS EMERGENCY AND RECOVERY PROGRAM – CWS INDONESIA
Education; Health ; Infrastructure, Housing & Land; Social
CWS (Church World Service);
21-Dec-07
(EDUC) Number of elementary schools built/repaired;
1-Apr-05
1-Jan-07
(HEAL) Training-Environmental HealthService (Number of Personnel Trained); (INFRA) Human Waste Management Number of toilet constructed/rehabilitated; (INFRA) Water Supply - Number of (smallscale) water points rehabilitated or constructed
1-Apr-05
1-Jan-07
INFRA 114 IN
INFRA 131 IN
7
INFRA 150 IN
DAHANA
Construction temporary market Economic Development
Help e.V. - Hilfe zur Selbsthilfe;
14 Aug 2005
14 Oct 2005
(ECON) Number of traditional markets established
GIDO;
HILIWETO GIDO; SISARAHILI SOGEADU;TETEHOSI I;
Nias Water, Sanitation and Education Rehabilitation Project
World Vision;
1-Jul-05
01 Oct 2007
HILIDUHO
ONONAMOLO I BOTOMUZOI;FADORO LAURU;FULOLO BOTOMUZOI;HILIWAELE II; LOLOFAOSO LALAI;
LOLOFITU MOI
EHOSAKHOZI; LEWUOMBANUA;OMBOLATA ; ONOMBONGI;SIHAERO III
MANDREHE LAHEWA
HAYO;HILI MOAWO (LAHEWA)
ALASA
HILIGAWONI;
Kecamatan to be Moawo Defined - Kab. NIAS INFRA 153 IN
(EDUC) Number of schools equipped with sanitation facilities; (HEAL) Service-Health Promotion-Program (Number of Beneficiaries); (HEAL) Service-Nutrition-Program (Number of Beneficiaries); (INFRA) Number of houses built; (INFRA) Number of land titles issued; (INFRA) Water Supply - Number of water distribution facilities rehabilitated; (SOCIAL) Number of community initiative
GUNUNG SITOLI
INFRA 137 IN
INFRA 138 LN
Key Performance Indicator
1-Jul-05
INFRA 109 IN
6
8
Design Status Ongoing Status Completed Status Suspended Status
Project ASRE 51: Emergency Response in Banda Aceh, Aceh Barat, Nagan Raya, and Aceh Utara: Shelter Sector.
Infrastructure, Housing & Land
Infrastructure, Housing & Land
Reconstruction Desa Infrastructure, Hiligawoni, Bitaya, Ononamolo Housing & Land Kecamatan Lahewa, Nias COASTPLAN Aceh-Nias – using risk maps for strategic planning and sustainable development, increasing geohazard preparedness and awareness
YEU (YAKKUM Emergency Unit);
26-Jun-06
26-Jun-08
(INFRA) Human Waste Management Number of sanitation schemes restored; (INFRA) Human Waste Management Number of toilet constructed/rehabilitated; (INFRA) Water Supply - Number of (smallscale) water points rehabilitated or constructed; (INFRA) Water Supply - Number of ground water wells purified; (INFRA) Water Supply - Number of water distribution facilities rehabilitated (INFRA) Number of houses built
Yayasan Holi'ana'a;
13/des/2005
30-Mar-07
11 May 2006
11 May 2008
TNO Built Environment Institutional Development - Public and Geosciences; Order and Safety; Spatial planning
Page 2 of 16
KPI Target KPI Progress 1
Project Status
1 Completed
5000
0 Ongoing
1000
0
1000
0
0
0 Ongoing
0
0
0
0
235 0 0
39 0 0
0
0
1
1 Completed
895
314 Ongoing
883
353
28
9
4
4
25 70
12 35 Ongoing
(INFRA) Number of houses built
93
33 Ongoing
(INST) Number of civil servants who have received training; (SPAT) maps have been proceed (percentage)
55
0 Design
100
0
NO
Project
Kecamatan TUHEMBERUA
9
10
Sector
Aceh-Nias Settlements Infrastructure, Support Programme (ANSSP). Housing & Land
Partner (1st Level) UN-HABITAT;
Start Date 1-Apr-05
End Date 21 Dec 2006
12
INFRA 190 IN
INFRA 197 IN
15
INFRA 198 UN
200 10
0 Ongoing 0
2
1 Ongoing
41
41 Completed
Economic Development; Infrastructure, Housing & Land
Soluziona S.A;
10 Aug 2006
10 Dec 2007
(ECON) Number of people served; (INFRA) Number of electrical distribution facilities rehabilitated
SIROMBO
SITOLU BANUA
Project ASRE 51: Emergency Response in Aceh Besar, Aceh Barat, Nagan Raya, Aceh Utara and Nias: Clean Water and Sanitation Sector
Infrastructure, Housing & Land
YEU (YAKKUM Emergency Unit);
28 Dec 2004
28 Dec 2006
(INFRA) Water Supply - Number of (smallscale) water points rehabilitated or constructed; (INFRA) Human Waste Management Number of toilet constructed/rehabilitated;
SIROMBO
SIROMBU
Sirombu Village House and Boat Project
Economic Development; Infrastructure,
United Diversity Forum;
1-Feb-05
1-Feb-06
(ECON) Number of fishing vessels provided/replaced; (INFRA) Number of houses built
HILIDUHO
D I M A; DAHADANO BOTOMBAWO; FADORO Permanent Housing Program HILIMBOWO (HILIDUHO); FADORO for Nias in the subdistricts of HUNOGOA; FADORO LAURU; FADORO YOU; Hiliduho and Gunung Sitoli FULOLO BOTOMUZOI; FULOLO LALAI; HILIDUHO; HILIGADU BOTOMUZOI; HILIMBOWO BOTOMUZOI; HILIWAELE I; LASARA TANOSEO; LAWA LAWA; LOLOFAOSO LALAI; LOLOWUA; MAZINGO TANOSEO; NAZALOU ALOOA; OMBOLATA SALOO; ONONAMOLO I BOTOMUZOI; ONONAMOLO TALAFU; SIMANAERE BOTOMUZOI; SINARIKHI; SISOBAHILI I TANOSEO; SISOBALAURU; TARAKHAINI;
Infrastructure, Samaritan's Purse; Housing & Land; Institutional Development - Public Order and Safety
01 Nov 2005
1-Nov-07
(INFRA) Human Waste Management Number of sanitation schemes restored; (INFRA) Number of houses built
SIROMBU
ZOTF Sirombu Village community reconstruction project
Education; Infrastructure, Housing & Land
ZTOF (Zero to One Foundation);
1-Feb-05
Infrastructure, Housing & Land
UNDP;
01 Dec 2005
31-Mar-07
(INFRA) Number of ports/harbours redeveloped
AMDA (Association of Medical Doctors of Asia)/UNHCR (United Nations High Commissioner
16-Sep-05
31-Dec-06
(INFRA) Number of houses built; (INFRA) Number of lightly damaged house(s) repaired; (INFRA) Number of heavily damaged houses repaired; (INFRA) Physical progress for houses built (%); (INFRA) Physical progress for mayor/heavy damaged houses repaired (%); (INFRA) Physical progress for minor damaged houses repaired (%)
GUNUNG SITOLI
MOAWO
Port Development
BAWOLATO; IDANO GAWO
BOTOHAENGA;TAGAULE BOZIHONA;
Community-Based Emergency Infrastructure, Shelter Rehabilitation in Nias Housing & Land Island, North Sumatra, Indonesia
INFRA 206 IN
Page 3 of 16
1-Feb-06
Project Status
109 0
Feasibility study for the development of wind energy in Nias regency, Nias Island, North Sumatra
SIROMBO
KPI Target KPI Progress
(INFRA) Number of houses built; (INFRA) Length of roads rebuilt/constructed (Km); (INFRA) Number of bridges rebuilt; (INFRA) Number of public buildings built/repaired; (INFRA) Water Supply - number of deep water well rehabilitated/drilled
All Desas - LAHEWA
INFRA 192 IN
14
Key Performance Indicator
LAHEWA INFRA 173 IN
INFRA 174 LN
16
HILIMBOSI
Project Title
INFRA 165 UN
11
13
Desa/Village
(EDUC) Number of elementary schools built/repaired; (INFRA) Number of bridges rebuilt; (INFRA) Number of houses built; (INFRA) Water Supply - Number of (largescale) water systems restored
79 Ongoing 0
5 1
0 0
0
0
239
239
250
250 Ongoing
350
2 9 254 3
80
2 Completed 9 254 3
1
0 Ongoing
248 25
139 Ongoing 0
300
0
300
82.54
300
0
0
0
NO
Project
17
INFRA 235 IN
18
INFRA 274 LN
19
INFRA 276 GI
20
INFRA 289 IN
Kecamatan
Desa/Village
Project Title
AFULU
AFULU;FAEKHUNAA;HAREWAKHE;LAURU FADORO; LAURU I AFULU; LAURU LAHEWA;SIFAOROASI ;OMBOLATA AFULU
LAHEWA
FADORO HILIHAMBAWA; FADORO HILIMBOWO ; FADORO SITOLU HILI; HILI GAWOLO; HILI GODUHOYA; HILI HATI; HILINA'A ; HILIZUKHU; HOLI ; IRAONO LASE ; LAHEWA; LAOWOWAGA; LASARA; MOAWO ; MUZOI; OMBOLATA ; ONOZALUKHU;; SIFAOROASI ; SIHENEASI; SITOLU BANUA ; SULEUE; TEFAO; TETEHOSI SOROWI; TUGALA LAURU AFIA Desa to be Defined - MANDREHE; LASARA Sirombu Housing BAGAWU; SISARAHILI II
MANDREHE
Housing, reconstruction and rehabilitation in Aceh Besar, Aceh Jaya and Nias Utara (CPR 21&42)
Sector
End Date
Infrastructure, Housing & Land
BRR SATKER - 464862 - 01 Aug 2005 SEKRETARIAT, KEUANGAN, KOMUNIKASI DAN INFORMASI; Canadian Red Cross;
01 Aug 2008
(INFRA) Number of houses built; (INFRA) Physical progress (%)
579 1,488
Infrastructure, Housing & Land
Caritas Sibolga;
1-Mar-05
30-Jun-06
(INFRA) Number of houses built
33 8 9
33 Completed 8 9
ACH (Aceh Concern on Humanity); BRR (Badan Rehabilitasi dan Rekonstruksi); World Harvest;
3-Jan-06
28-Feb-09
(INFRA) Number of land titles issued (INFRA) Length of roads rebuilt/constructed (Km);
1
0 Ongoing
1-Mar-05
31 Dec 2006
(INFRA) Number of public buildings built/repaired
1
1 Completed
OXFAM;
24-Mar-05
1-Jan-08
(ECON) Number of loans provided to micro business (loan < 5 million); (ECON) Number of micro business developed; (ECON) Number of sets of fish processing equipment provided; (ECON) Number of worker for cash work programme; (INFRA) Human Waste Management Number of toilet constructed/rehabilitated; (INFRA) Water Supply - Number of (smallscale) water points rehabilitated or constructed
All Desas
Nias Roads, Transport & City Development Planning and Design.
Infrastructure, Housing & Land
TUHEMBERUA
TELUK BELUKAR
Multi-Purpose Buildings as Community Centers in Tsunami and Earthquake Affected Communities
Infrastructure, Housing & Land
BAWOLATO
BOTOHAENGA; SIFOARASI ULUHOU;SIOFABANUA;SISARAHILI BAWOLATO;TAGAULE;
Nias Earthquake Humanitarian Economic Response Development; Infrastructure, Housing & Land
GIDO
BARUZO; FOWA;HILIWETO IDANOI;HUMENE; LAURI;SISARAHILI SOGEADU;SIWALUBANUA II;SOMI; TETEHOSI I; TETEHOSI II;TUHEGEO I; UMBU
GUNUNG SITOLI
21
INFRA 303 IN
IDANO GAWO
LAHEWA
TUHEMBERUA
22
INFRA 310 UN
All Kecamatans Kab. NIAS
HILINA'A ; ILIR;LASARA BAHILI ; MIGA;MOAWO; OLORA;ONOZITOLI SIFOROASI;PASAR GUNUNG SITOLI
Key Performance Indicator
KPI Target KPI Progress
Project Status
Start Date
All Kecamatans Kab. NIAS
Partner (1st Level)
0 Ongoing 0
77
77 Ongoing
67
54
8
4
200
200
755
721
242
236
HOLI ;TETEHOSI; MALIWAA;BIOUTI; BOZIHONA;HILILAWAE;OLADANO; ONODALINGA;SAIWAHILI; SISOBAHILI IRAONOHURA HOLI ;LAHEWA;LUKHU LASE;MOAWO; MUZOI; OMBOLATA ;ONOZALUKHU;SIHENEASI; TEFAO;TETEHOSI SOROWI; TUGALA LAURU; BALEFADORO TUHO;HILI GAWOLO; AFIA AHEDANO ALOOA BANUAGEA All Desas
Collaborative Rehabilitation Infrastructure, Nias (CRN) - Timber Supply for Housing & Land Rehabilitation in Nias Island
Page 4 of 16
UNHCR;
20 Aug 2005
31 Dec 2006
(INFRA) Number of building material supplied (USD)
5,550,000
5,550,000 Completed
NO
Project
Kecamatan AFULU; ALASA; BAWOLATO; GIDO;
Desa/Village Desa to be Defined Desa to be Defined;HILIMBOWO KARE;OMBOLATA SISARAHILI BAWOLATO Desa to be Defined - GIDO;BINAKA
Project Title
Sector
IFRC - Integrated Water, Infrastructure, Sanitation and Hygiene Housing & Land Promotion - Community Reconstruction Project - Nias Island District (CPW46 PW93)
Partner (1st Level) IFRC (International Federation of Red Cross & Red Crescent Societies);
Start Date 30 Aug 2005
End Date 30-Sep-08
GUNUNG SITOLI;
HILIDUHO;
23
INFRA 330 IN
IDANO GAWO; LAHEWA; LOLOFITU MOI;
BOYO;HILI HAO;LASARA BAHILI ;LOLOMOYO TUHEMBERUA;OLORA; SAOMBO;TUHEMBERUA ULU;TUMORI Desa to be Defined - HILIDUHO;FADORO HUNOGOA;LASARA BOTOMUZOI;LASARA TANOSEO
OLADANO; TETEHOSI AFIA; HILI GAWOLO;HOLI ;MUZOI; MOAWO;SIHENEASI; All Desas - LOLOFITU MOI; AMBUKHA ; LOTU; HILIMBOWO MAU;HILIUSO; SAMASI ; MANDREHE; TUHEMBERUA;SALOO;SISARAHILI II; TUHEMBERUA;TUWUNA NAMOHALU ESIWA; Desa to be Defined - LOTU SIROMBO; BALODANO; FADORO ;HILISANGAWOLA; TUHEMBERUA LAWELU; LOLOGOLU Desa to be Defined - NAMOHALU ESIWA GUNUNG CAHAYA;HILIADULO ; TIGA LOTU HILIGODU 24
INFRA 331 IN
25
INFRA 342 GI
INFRA 35 UN
30-Jun-06
Bantuan Operasional PDAM Infrastructure, Tirta Umbu Gunung Sitoli, Kab. Housing & Land Nias
ACH (Aceh Concern on Humanity); BRR (Badan Rehabilitasi dan Rekonstruksi);
01 May 2006
01 Aug 2006
(INFRA) Water Supply - Number of water distribution facilities rehabilitated
HILIDUHO;
D I M A;OMBOLATA SALOO; ONOZITOLI DULU; SINARIKHI;SISOBAHILI I TANOSEO;TUHEGAFOA II
Water and sanitation program Infrastructure, for vulnerable people of Housing & Land Lolofitu-Moï, Mandrehe, Hiliduo sub-districts of Nias Island and Aceh Barat, Nagan Raya and Pïdie Districts in the Aceh Province.
Solidarites;
1-Feb-06
30-Apr-07
(INFRA) Water Supply - Number of (smallscale) water points rehabilitated or constructed (INFRA) Human Waste Management Number of toilet constructed/rehabilitated (HEAL) Service- Environmental HealthHealth Care Waste Management-Program (Number of Beneficiaries) (INFRA) Human Waste Management Number of public toilet facilities constructed/rehabilitated
MANDREHE SIMAEASI ; TETEHOSI ; TUHO OWO
Kecamatan to be Desa to be Defined Defined - Kab. NIAS 27
WISH (Water Initiative for 1-Apr-06 Securing Health);
Desa to be Defined
ONOWAEMBO ;WANGO; INFRA 346 IN
Infrastructure, Housing & Land
(INFRA) Human Waste Management Number of toilet constructed/rehabilitated; (INFRA) Water Supply - Number of (smallscale) water points rehabilitated or constructed; (INFRA) Water Supply - Number of houses supplied with water; (INFRA) Water Supply - Number of water distribution facilities rehabilitated
GUNUNG SITOLI
LOLOFITU MOI;
26
Potable Water for Tsunami Victims
Key Performance Indicator
Emergency Water and Environmental Sanitation for Nangnroe Aceh Darrussalam and North Sumatra Provinces
Infrastructure, Housing & Land
Page 5 of 16
UNICEF;
(INFRA) Water Supply - Number of (smallscale) water points rehabilitated or constructed
KPI Target KPI Progress 206
Project Status
10 Ongoing
5
5
4
0
24.331
26
8
0 Completed
1
0 Ongoing
123
21 Ongoing
730
327
4284
1918
160
35
0
0 Ongoing
NO
Project
Kecamatan MANDREHE; SIROMBO
28
INFRA 360 LN
Desa/Village IRAONO GAMBO; IRAONOGEBA ;LASARA BAENE; LASARA BAGAWU; ONOLIMBURAYA; ONONAMOLO III; SISARAHILI II; SISOBAMBOWO ;SISOBANDRAO
Project Title
Sector
Partner (1st Level)
Start Date
End Date
Key Performance Indicator
KPI Target KPI Progress
Project Status
Earthquake Relief Housing Mandrehe
Infrastructure, Housing & Land
Caritas Sibolga;
1-Jul-06
31 Dec 2006
(INFRA) Number of houses built; (INFRA) Number of houses occupied; (INFRA) Physical progress for houses built (%)
129 129 900
129 Ongoing 0 0
520 Completed
Desa to be Defined - SIROMBO;SIROMBU
29
30
31
32
33
LAHEWA
Desa to be Defined - LAHEWA; LAHEWA; MUZOI; SIHENEASI; SITOLU BANUA
Emergency assistance to shelter and water and sanitation systems rehabilitation in Kec. Lahewa, Kab. Nias
Infrastructure, Housing & Land
ACTED (Agency for Technical Cooperation and Development);
1-Apr-05
01 Nov 2005
(INFRA) Number of houses built; (INFRA) Water Supply - Number of (smallscale) water points rehabilitated or constructed
520
GUNUNG SITOLI
SAOMBO
Sektor Air Belanda dukung Sektor Air Sumatera Wilayah Utara (SAB-SAS)
Infrastructure, Housing & Land
SAB-SAS;
1-Apr-05
1-Apr-07
(INFRA) Water Supply - Number of water distribution facilities rehabilitated; (INFRA) Number of study report; (INFRA) Human Waste Management Number of public toilet facilities constructed/rehabilitated; (INFRA) Water Supply - Length of primary or secondary water mains rehabilitated/provided (km); (INFRA) water supply - Number of houses supplied with water '-- KPI to be Defined
1
0 Ongoing
1 3
0 0
1
0
INFRA 50 Bilat
INFRA 99 Bilat
Kecamatan to be Desa to be Defined Defined - Kab. NIAS
Emergency assistance to shelter and water and sanitation systems rehabilitation in Kec. Lahewa, Kab. Nias
BAWOLATO; IDANO GAWO
Botohaenga,Tagaule ; Bozihona
AFULU
LAURU FADORO
Community-Based Emergency Infrastructure, Shelter Rehabilitation Housing & Land ; (CBESR) for IDPs in Nias Institutional Development General Public S i Dusun Fadoro & Dusun Saua Infrastructure,
INFRA 93 Bilat
INFRA 158 IN
35
36
None
AMDA (Association of Medical Doctors of Asia);
(INFRA) Number of temporary houses built; (INST-GPS) Number of monitoring arrangements developed to ensure compliance with relevant standards and guidelines 15 Dec 05
(INFRA) Number of water distribution facilities rehabilitated
PROGRAM Infrastructure, PENANGGULANGAN Housing & Land BENCANA GEMPA BUMI DAN TSUNAMI ACEH DAN NIAS_1
YTBI (Yayasan Tanggul Bencana di Indonesia);
22-Apr-06
22-Apr-08
None
Kecamatan to be To be Defined Defined - Kab. NIAS
Community Water Services and Health Aceh/Nias-North Sumatra Project
Ministry of Health/ADB; Canadian International Development Agency (CIDA)
1-May-05
1-May-09
(HEAL) Service-Environmental HealthHealth Care Waste Management-Program (Number of Beneficiaries); (INFRA) Number of latrines built
Tobe defined Kab Nias
Earthquake and Tsunami Emergency Spport project ( ETESP ) , Housing component
ADB ( Asian Development Bank )
1-Apr-06
1-Apr-07
( INFRA ) Number of heavily demaged houses repaired ( INFRA ) Number of houses built
INFRA 170 IN
Onolimburaya,Onolimbu You,Onozalukhu You,Sisarahili II,Tumori
INFRA 191 LN
INFRA 1 Multi
INFRA 34 Multi
None
FHI (Food for The Hungry 15-Sep-05 International);
Water Treatment System Implementation Project – Nias Island MANDREHE
34
Economic ACTED (Agency for Development; Health ; Technical Cooperation Infrastructure, and Development); Housing & Land; Unallocated
Desa tobe defined
Housing & Land
Health ; Infrastructure, Housing & Land; Institutional Development General Public Services Infrastructure, Housing and Land
Page 6 of 16
143
0
0
0 Ongoing
254 9902
0 Ongoing 0
1
1 Completed
None
None Ongoing
0
0 Ongoing
900
0 Design
NO
37
38
Project
CROSS 13 IN
Kecamatan
Sector
Partner (1st Level)
Start Date
End Date
All Desas - LAHEWA; All Desas - MANDREHE; Economic Development; Reconstruction All Desas - SIROMBO; Unallocated Health ; Infrastructure, Housing Program Nias & Land
Diocese;
1-Feb-05
1-Feb-07
GUNUNG SITOLI
LASARA BAHILI (GUNUNG SITOLI) Kab. NIAS GUNUNG SITOLI SIFALAETE TABALOHO
Caritas Sibolga/Caritas Italy; IFRC (International Federation of Red Cross and Red Crescent
29/03/2006
14/09/2006
The Report of Transitional Shelter's Per Implementing Partners
Infrastructure, Housing & Land
INFRA 411 IN
MUZOI
Reconstruction of houses in Muzoi
Infrastructure, Housing & Land
INFRA 430 IN
ALASA
40
Project Title
LAHEWA; MANDREHE; SIROMBO; Unallocated
LAHEWA
39
Desa/Village
ONONAMOLO TUMULA, HILIGAWONI, BITAYA
Infrastructure Program
Infrastructure, Housing & Land
INFRA 396 LN
Page 7 of 16
Help e.V. - Hilfe zur 4-Jan-06 Selbsthilfe/ADH (Aktion Deutschland Hilft); ADRA (Adventist Development and Relief Agency) Australia
Yayasan Holi'ana'a/Heks - 1-Apr-06 Swiss
31/12/2006
30-Oct-08
Key Performance Indicator (ECON) Number of worker for cash work programme; (HEAL) Capacity Building-Other-program (Number of Beneficiaries); (INFRA) Number of people served; (INST) Number of civil servants who have received t i i (INFRA) Number of houses occupied (INFRA) Number of temporary houses built (INFRA) Physical progress for temporary houses buil
(INFRA) Number of houses built (INFRA) Number of houses occupied (INFRA) Number of heavily damaged houses repaired (INFRA) Physical progress for houses built (%) (INFRA) Physical progress for mayor/heavy damaged houses Repaired (%) (INFRA) Water Supply Number of Deep Water Well Rehabilitated/Drilled (INFRA) Human Waste ManagementNumber of Public Toilet facilities constructed/Rehabilitated (INFRA) Water Supply Number of Water Distribution Facilities rehabilitated (INFRA) Water Suplply Number of (Small Scale) water points rehabilitated or constructed (INFRA) Panjang jalan lingkungan
KPI Target KPI Progress
Project Status
0
0 Ongoing
52
52 Completed
42
42
200
200
70 73 34
23 Ongoing 0 0
100
30
100
0
1
0 Ongoing
36
0
9
0
25
0
5000
0
Sector Date Total of Project Total of Organization
NO
1
2
Project
ECON 100 IG
: Economy : December 01, 2006 : 20 : 19
Kecamatan GUNUNG SITOLI;BAWOLATO; IDANO GAWO; LOLOFITU MOI; SIROMBO;HILIDUHO LAHEWA GUNUNG SITOLI SIROMBO
Desa/Village Desa to be Defined
:1 :15 :4 :0
Project Title
Sector
Partner (1st Level)
Start Date
End Date
3
ECON 156 Bilat
4
ECON 165 IN
6
ECON 218 UN
7
ECON 273 LN
KPI Target
KPI Progress
Project Status
IOM (International Organization 1-Apr-05 of Migration);
31 Aug 2005
(ECON) Number of traditional markets established
500
500 Completed
BALOHILI BOTOMUZOI
ILIR LAHEWA; MOAWO ; MUZOI ONO LIMBU; SIROMBU
Project ASRE 51: Emergency Response in Economic Aceh Besar, Nagan Raya, Aceh Utara, Development and Nias: Livelihood Recovery Sector
YEU (YAKKUM Emergency Unit);
28-Dec-06
(ECON) Number of business developed; (ECON) Number of loans provided to micro business (loan < 5 million); (ECON) Number of loans provided to small business (loan IDR 5-50 million); (ECON) Number of micro business developed; (ECON) Number of extention, training, information and testing programmes established; (ECON) Number of fishing vessels provided/replaced
121
121 Completed
Desa to be Defined
28 Dec 2004
26
26
86
86
14
14
30
30 Completed
30
30
Supporting Program for the Fishery Community by Providing Motorboat and Training the Community for Productivity Improvement in Afulu and Lahew Subdistric, Nias District North Sumatra Province
Economic Development
Swiss Project for Business Recovery in Aceh and North Sumatra (SPAN)
Economic Development
Swisscontact;
1-Jul-05
1-Jun-08
(ECON) Number of worker for cash work programme
5000
0 Ongoing
Economic Development
ACE (Association for Community Empowerment);
25 Oct 2005
25 Dec 2006
(ECON) Number of micro business developed
528
217 Ongoing
Economic Development
FAO (Food Agriculture Organization);
1-Jul-06
30-Jun-07
(ECON) Amount of seeds and fertilizer provided (Kg); (ECON) Number of participants of vocational training
All Kecamatans - Kab. NIAS
All Desas
GUNUNG SITOLI;
BAWADESOLO; Delivering a Sustainable Livelihood Small BOYO;DAHANA;BOYO;FADORO Grant Programme in Aceh & Nias LASARA; HILIMBOWO OLORA;HILINA'A; SAOMBO; PASAR GUNUNG SITOLI;SISARAHILI SISAMBALAHE
IDANO GAWO;
HILIMBOWO;FATODANO
SIROMBO;
SITOLU BANUA
TUHEMBERUA
TETEHOSI AFIA; BOTOLAKHA;
AFULU; BAWOLATO; IDANO GAWO; TUHEMBERUA
All Desas
MANDREHE
GUNUNG BARU; HILIDAURA; LASARA FAGA; MAZINGO ONOZALUKHU YOU; ORAHILI BADALU; SIDUA HILI
ECON 181 IN
Key Performance Indicator
Immediate Emergency Relief in Nias and Economic Simeulue Islands in Indonesia(IOM ECHO Development Phase 1 Emergency response)
ECON 145 LN
AFULU LAHEWA
5
Design Status Ongoing Status Completed Status Suspended Status
Rehabilitation assistance for agricultural and fisheries based livelihoods on Nias Island through supply of primary production inputs, training and marketing support.(OSRO/INS/602/EC) Income Generating and Education Support Project for IDPs in Banda Aceh and Nias
Economic Development; Education
Page 8 of 16
Perkumpulan Keluarga Berencana Indonesia;
Yayasan Solidaritas Sesama Indonesia;
01 May 2005
6-Jan-06
31-Mar-06
4-Jan-08
(ECON) Number of micro business developed; (EDUC) Number of scholarships provided
950.000 11.100
0 Design 0
116
0 Ongoing
308
0
NO
Kecamatan
Project
BAWOLATO MANDREHE TUHEMBERUA
8
SAOMBO
ECON 287 IN ALASA; NAMOHALU ESIWA
10
HILIALAWA ONOLIMBURAYA SAWO
Project Title
Sector
Sustainable tourism – Eliminating poverty in Nias (Indonesia) - Coastal, agriculture and tourism project (CAT)
Economic Development
Partner (1st Level) Istituto Agronomico per l'Oltremare;
Start Date 8-Jan-07
End Date 31 Dec 2009
ECON 280 IN
GUNUNG SITOLI 9
Desa/Village
ECON 300 LN
BANUA SIBOHOU I ; BANUA SIBOHOU II ; ESIWA; FULOLO; HILISEBUA SIWALUBANUA; LOLOANA'A; NAMOHALU; OMBOLATA
Upgrading program for small and medium enterprises (SME)
Economic Development
PUM (Netherlands Senior Experts);
1-Jun-05
Pelmas-BNKP and World Relief Partnership in Livelihood Recovery
Economic Development
Pelmas BNKP;
15 Aug 2005
1-Jun-10
Key Performance Indicator (ECON) Area of agricultural land rehabilitated (Hectares); (ECON) Area of coastal (inshore, beach, corals) restored (Hectares); (ECON) Area of fishponds/tambak restored (Hectares); (ECON) Area of forest protected/rehabilitated (Hectares); (ECON) Area of mangrove restored (Hectares); (ECON) Employment programme implemented (Number of beneficiaries); (ECON) Number of participants of vocational training; (ECON) Number of people served; (ECON) Number of study/survey report; (ECON) Number N b off loansti provided l (ECON)
31-Mar-08
(ECON) Amount of seeds and fertilizer provided (Kg); (ECON) Area of agricultural land rehabilitated (Hectares); (ECON) Employment programme implemented (Number of beneficiaries); (ECON) Number of participants of vocational training; (ECON) Number of vocational
11
ECON 72 Bilat ECON 82 UN
Kecamatan to be Defined - Desa to be Defined Kab. NIAS
ILO Aceh programme: Labour Based Rural Infrastructure, Housing ILO (International Labour Infrastructure Rehabilitaiton & Land Organization);
03 May 2005
30-Mar-08
12
(INFRA) Length of roads rebuilt/constructed (Km)
MANDREHE
All Desas
ILO Aceh Programme: Prevention of Child Education Labour Among Vulnerable Children in Aceh and Nias Providing Education Initiatives
ILO (International Labour Organization);
1-Mar-05
31-Mar-07
(ECON) Number of participants of vocational training;
GIDO
HILIMBOWO DESOLO; HILIWETO GIDO; LAWA-LAWA LUO (GIDO); SOGAEADU; SOMI; TETEHOSI I; TUHEMBUASI All desas
Market Rehabilitation
French Red Cross;
1-Dec-06
31-Jan-07
(ECON) Number of traditional markets established
ILO Aceh Programme: Local Economic Economic Recovery and Development to Rebuild Development Livelihoods and Employment Opportunities
ILO (International Labour Organization);
23-Jun-05
5-Nov-06
13
ECON 83 UN
14
ECON 85 IN
15
ECON 84 UN
16
ECON 154 IN
17
ECON 6 Multi
All Kecamatans - Kab. NIAS
Rehabilitation of Local Market Places
Economic Development
Economic Development
JICS;
MANDREHE
Onolimburaya, Onolimbuyou, Onozalukhu You, Sisarahili II, Tumori
PROGRAM PENANGGULANGAN Economic BENCANA GEMPA BUMI DAN TSUNAMI Development ACEH DAN NIAS
YTBI (Yayasan Tanggul Bencana di Indonesia);
GIDO
Desa to be defined
Overall Asian Development Bank Project: Economic Development Earthquake and Tsunami Emergency Support Project (ETESP); Sector: Irrigation
Ministry of Settlement and Regional Infrastructure;
Page 9 of 16
Project Status
60
0 Ongoing
30
0
30
0
30
0
30
0
30
0 0
30 1500 90
0 0
180 4
0 3 Ongoing
922.740
156.000 Ongoing
to micro business (loan < 5 million)
All Kecamatans - Kab. NIAS
All Desas
KPI Progress
KPI Target
1-Jul-05
1-Jul-06
(ECON) Number of traditional markets established
01 May 2006
1-Nov-08
303
50
1.150
681
1.200
425
24
10
2
2 Completed
27
7 Ongoing
1200
0 Ongoing
5
0 Ongoing
None
None
None Ongoing
None
None
None Ongoing
(ECON) Length of irrigation canal new/rehabilitated (Km)
0
0 Design
NO
18
19
20
21
Project
Kecamatan
Desa/Village
Earthquake & Tsunami emergency Support Project (ETESP) Agriculture Component
Economic Development; Institutional Development General Public Services
AFULU; GUNUNG SITOLI; Desa to be defined LAHEWA; SIROMBO; TUHEMBERUA
Earthquake and Tsunami Emergency Support Project (ETESP-Fisheries) Fisheries sector rehabilitation and reconstruction in Nias district of Nias Island, North Sumatera.
Economic Development; Institutional Development General Public Services
ECON 160 Multi
ECON 210 IN
Sector
Kecamatan to be Defined - All desas Kab ECON 93 GI
ECON 123 IN
Project Title
Partner (1st Level) BRR SATKER - 459011 PEMBINAAN TEKNIS PERUMAHAN INFRASTRUKTUR DAN PENATAGUNAAN LAHAN NAD DAN NIAS; Ministry of Agriculture (MOA); Ministry of Marine Affairs and Fisheries (MMAF);
Start Date
End Date
Key Performance Indicator
1-Jun-08
(ECON) Number of industrial/agricultural machines provided
6
0 Ongoing
1-Nov-05
1-May-08
(ECON) Equipment & supplies provided (Value USD); (ECON) Number of fishing vessels provided/replaced; (ECON) Number of traditional markets established; (INST-GPS) Number of civil servants who have received training; (INST-GPS) Number of government
0
0 Ongoing
MOAWO; MUZOI; SAWO
Green Coast Project Nature and People after the Tsunami
Economic Development;
Wetlands InternationalIndonesia / Oxfam
7-Oct-06
30-Apr-07
None
Gunung Sitoli
All Desas
Aceh TRADE UNION VOCATIONAL EDUCATION AND LIVELIHOOD SECURITY Project
Education
UAA-APHEDA/ Donors to be identified; TUC (Trade Union Centre, UK); UAA-APHEDA
14/11/2005
14/01/2008
(EDUC) Number of teachers trained (ECON) Number of participants of vocational training
Page 10 of 16
Project Status
1-Jul-05
LAHEWA; TUHEMBERUA
Economic Development
KPI Progress
KPI Target
30
0
2
0
0
0
1
0
None
None Ongoing
80
0 Ongoing
80
0
Sector Date Total of Project Total of Organization
NO
: Education : December 01, 2006 : 13 : 11
Kecamatan
Project
AFULU HILIDUHO 1
EDUC 110 LN
3
EDUC 124 IN
4
EDUC 125 IN
5
EDUC 136 IN
HAREWAKHE HILIWAELE I
Reconstruction of 3 schools in Tetehosi village, Idano Gawo sub district
ONOLIMBURAYA; ONOLIMBUYOU; ONOZALUKHU YOU; SISARAHILI II; TUMORI
PROGRAM PENANGGULANGAN BENCANA GEMPA BUMI DAN TSUNAMI ACEH DAN NIAS
LAHEWA
LAHEWA
MANDREHE
:1 :8 :4 :0
Sector Education
Partner (1st Level) French Red Cross;
01 Oct 2005
End Date 1-Jul-06
Key Performance Indicator (EDUC) Number of elementary schools built/repaired; (EDUC) Number of junior high schools built/repaired
KPI Target
KPI Progress
Project Status
2
0 Design
1
0
1-Jan-05
1-Jan-07
(EDUC) School equipment & supplies (Value USD);
Lazarus-HW Lahewa Junior High Education School
LAZARUS HILFSWERK;
01 Aug 2005
31-Mar-06
(EDUC) Number of junior high schools built/repaired
4
4 Completed
DOLI DOLI
Lazarus-HW (Batch 12) Mandrehe Senior High School
LAZARUS HILFSWERK;
01 Aug 2005
01 Dec 2005
(EDUC) Number of senior high schools built/repaired
1
1 Completed
GUNUNG SITOLI
MADULA
Johanniter - International Assistance;
16-Jan-06
31 Oct 2006
(EDUC) Number of elementary schools built/repaired
1
0 Ongoing
GIDO;
HILIWETO GIDO; SISARAHILI SOGEADU;TETEHOSI I; TETEHOSI II;TULUMBAHO
Education Reconstruction of the Primary School (SD) No 074040, Madula, Gunung Sitoli Subdistrict, Nias District Nias: Education Project Education; Social
World Vision;
1-Jun-05
01 Oct 2009
(EDUC) Number of elementary schools built/repaired; (EDUC) Number of junior high schools built/repaired; (EDUC) Number of schools equipped with sanitation facilities; (SOCIAL) Number of people trained (e.g. community leadership, peace education, social research methodology)
24
24 Completed
(EDUC) Number of beneficiaries/participants on vocational training; (EDUC) Number of books provided; (EDUC) Number of kindergarten built/repaired; (EDUC) Number of scholarships provided; (EDUC) Number of teachers trained; (HEAL) Number of people served; (HEAL) Service-MCH-Child and AdolescentProgram (Number of Beneficiaries); (HEAL) Service-MCH-Reproductive HealthProgram (Number of Beneficiaries); (HEAL) Service-Nutrition-Program (Number of Beneficiaries); (HEAL) Training-Health Promotion (Number of
450
Education
FADORO LAURU; FULOLO BOTOMUZOI;HILIWAELE II;LOLOFAOSO LALAI;ONONAMOLO I BOTOMUZOI;
LOLOFITU MOI;
EHOSAKHOZI (LOLOFITU MOI); OMBOLATA (LOLOFITU MOI); ONOMBONGI;LEWUOMBANUA
MANDREHE GUNUNG SITOLI;
FADORO; HAYO ; HILI WAELE; DEALING WITH THE FUTURE ILIR; MOAWO (GUNUNG OF CHILDREN POST THE SITOLI); MUDIK EARTHQUAKE IN NIAS LAHEWA; MOAWO (LAHEWA);
LAHEWA
Education;Social
Start Date
YTBI (Yayasan Tanggul Bencana di Indonesia);
EDUC 15 IN
EDUC 150 LN
Project Title
MANDREHE
HILIDUHO;
7
Desa/Village
EDUC 102 IN
2
6
Design Status Ongoing Status Completed Status Suspended Status
SIROMBO
All Desas - SIROMBO;
TUHEMBERUA
AFIA (TUHEMBERUA) GAWU GAWU BOUSO; HILIDURUWA; SAWO;
Economic PKPA (Pusat Kajian dan 01 Nov 2005 Development;Education; Perlindungan Anak)/Christian Health Aid; ILO (International Labour Organization); KNH (Kindernothilfe)
Page 11 of 16
01 Nov 2007
295,226
0 Ongoing
4
4
4
4
10
10
100 Ongoing
15000 1 400 510 400 4000
8500 1 194 260 150 1200
5000
2400
200
30
110
96
NO
Project
Kecamatan GUNUNG SITOLI
8
EDUC 188 UN
10
EDUC 23 UN
11
EDUC 70 Bilat
Sector
Difussion of sustainable and Earthquake-resistant Building Techniques and Best Practices for the Reconstruction of Nias Island
Education
Partner (1st Level) Tuscany Region;
Start Date 31-Jul-06
End Date 31-Jan-09
Key Performance Indicator
Emergency Support for Basic Education
Education
UNICEF;
1-Jan-05
1-Jan-10
(EDUC) Number of people served; (EDUC) Number of temporary schools built; (EDUC) School equipment & supplies (Value USD)
Kecamatan to be Defined - Kab. NIAS
Desa to be Defined
Basic Education
Education
UNICEF;
None
None
GIDO GUNUNG SITOLI
All Desas
Rehabilitation and Reconstruction of General Senior Secondary Schools (SMA)
Education
KfW; PEM GmbH Duesseldorf Germany;
15-Sep-05
GUNUNG SITOLI
All Desas
Project Tomorrow’s Hope (Nias) Education;Health; Infrastructure, Housing&Land; Social
Tomorrow’s Hope;
1-Jul-05
Rehabilitation and Education Reconstruction of Senior Secondary Vocational Schools (SMK) Rehabilitation and Modernization of Vocational Education in NAD and Nias
GTZ (Deutsche Gesellschaft 1/Jul/2005 für Technische Zusammenarbeit - German Technical Cooperation); KfW 1/Jul/2006 (Kreditanstalt für Wiederaufbau - German Financial Cooperation);
MOAWO
Page 12 of 16
KPI Target
(EDUC) Number of beneficiaries/participants on vocational training; (EDUC) Number of elementary schools built/repaired; (EDUC) Physical progress (%)
All Desas
EDUC 90 IN
EDUC 60 Bilat
Project Title
All Kecamatans - Kab. NIAS
GUNUNG SITOLI
13
HILINA'A (GUNUNG SITOLI)
EDUC 182 IN
9
12
Desa/Village
KPI Progress
300
Project Status 0 Ongoing
1
0
100
0
86,328 31 183,792
86,328 Ongoing 14 183,792
(EDUC) Number of elementary schools built/repaired;
0
0 Ongoing
31 Dec 2007
(EDUC) Number of senior high schools built/repaired
1
1 Completed
29-Jun-07
(EDUC) Number of elementary schools built/repaired; (EDUC) Number of senior high schools built/repaired; (SOCIAL) Number of dormitory rebuilt/new
1
0 Ongoing
1
0
1/1/2009
30/Juni/2009
None
0
10 None
None
Ongoing
Sector Date Total of Project Total of Organization
NO
Project
1
HEAL 100 IN
2
3
HEAL 104 LN
HEAL 117 LN
5
HEAL 118 LN
6
HEAL 121 LN
8
9
HEAL 144 IN
Design Status Ongoing Status Completed Status Suspended Status
Kecamatan
Desa/Village
:0 :7 :6 :0
Project Title
Sector
Partner (1st Level)
Start Date
End Date
Key Performance Indicator
KPI Target
KPI Progress
Project Status
MANDREHE; SIROMBO
All Desas
Tsunami Health Recovery Program in Nias
Health
Tearfund UK;
01 Nov 2005
01 Nov 2008
(HEAL) Training-Health Promotion (Number of Personnel Trained)
72000
0 Ongoing
GUNUNG SITOLI
ILIR; MUDIK;
Health
YEU (YAKKUM Emergency Unit);
25-Jun-06
25-Jun-08
14,232 Ongoing 4,188
LAHEWA;MOAWO;MUZOI
SIROMBO
SIROMBU;LOLOGUNDRE; SISOBANDRAO ; SITOLU BANUA TETEHOSI ; TOGIM BOGI;
73,012
25,660
6,500
3,899
TUHEMBERUA
TUGALAGAWU;ONO LIMBU AFIA
(HEAL) Number of people served; (HEAL) Rehabilitation & Reconstruction-Others (Number built/repaired); (HEAL) Rehabilitation & Reconstruction-Polindes (Number built/repaired); (HEAL) Service-Nutrition-Program (Number of Beneficiaries); (HEAL) Training-Health Promotion (Number of Personnel Trained) (ECON) Number of participants of vocational training; (EDUC) Number of people served; (HEAL) Service-Mental HealthProgram (Number of Beneficiaries)
26,502 24,003
LAHEWA
Project ASRE 51: Emergency Response in Aceh Besar, Aceh Barat, Nagan Raya, Aceh Utara and Nias: Health Sector
7,513
3,575
HEAL 103 IN
4
7
: Health : December 01, 2006 :13 :11
GUNUNG SITOLI;
ILIR;MUDIK
LAHEWA;
LAHEWA;MUZOI
SIROMBO;
SIROMBU;TOGIM BOGI
Project ASRE 51: Emergency Response in Aceh Besar,Aceh Utara, Aceh Barat and Nias for Tsunami and Earthquake: Psychosocial Sector
Economic Development; Education; Health
YEU (YAKKUM Emergency Unit);
YTBI (Yayasan Tanggul Bencana di Indonesia);
28 Dec 2004
TUHEMBERUA
AFIA
MANDREHE
ONOLIMBURAYA; ONOLIMBUYOU; ONOZALUKHU YOU; SISARAHILI II; TUMORI
PROGRAM PENANGGULANGAN BENCANA GEMPA BUMI DAN TSUNAMI ACEH DAN NIAS
Health
GUNUNG SITOLI
Desa to be Defined
Pemberian makanan tambahan anak Aceh dan Nias korban gempa/tsunami
Health
YPFP (Yayasan Pelayanan Fajar Harapan);
1-Apr-05
GUNUNG SITOLI MANDREHE
MADULA SISARAHILI II
Proyek Pendidikan dan Kesehatan Keluarga Masyarakat Nias
Health
PESADA;
AFULU
All Desas ;
GUNUNG SITOLI
SISOBAHILI;FAEKHUNAA; ; LAURU FADORO;ORAHILI TUMORI
1-Jan-05
28 Dec 2006
1-Jan-07
90 250 1.700
20 Ongoing 100 327
(HEAL) Equipment & SuppliesMedical - Consumable (Value USD); (HEAL) Rehabilitation & Reconstruction-Satellite Health Posts (Number provided)
0
0 Ongoing
0
0
01 Oct 2005
(HEAL) Equipment & SuppliesMedical - Consumable (Value USD)
0
0 Completed
01 Nov 2005
31 Dec 2008
(HEAL) Service-Health PromotionProgram (Number of Beneficiaries)
200
Health Emergency Assistance and Economic IMC (International Medical Relief for Tsunami-Affected Populations Development; Health ; Corps); (HEART) Infrastructure, Housing & Land
1-Jan-05
1-Jul-06
-- KPI to be Defined; (HEAL) Service-Others-Program (Number of Beneficiaries); (HEAL) Capacity Building-Otherprogram (Number of Beneficiaries);
16 10.350 40
0 Ongoing
16 Completed 10.305 40
HILIDUHO TUHEMBERUA
Desa to be Defined
PUSKESMAS Rawat Inap Awa'ai
Health
Mercy Malaysia;
1-Mar-06
28/Agus/2006
(HEAL) Physical progress (%); (HEAL) Rehabilitation & Reconstruction-Puskesmas (Number built/repaired)
100 1
100 Completed 1
GIDO
HILIWETO GIDO
PUSKESMAS Rawat Inap Hiliweto Gido Health
Mercy Malaysia;
01 May 2006
30-Nov-06
(HEAL) Physical progress (%); (HEAL) Rehabilitation & Reconstruction-Puskesmas (Number built/repaired)
100 1
10 Ongoing 0
HEAL 169 IN
HEAL 171 IN
Page 13 of 16
NO
Project
Kecamatan GUNUNG SITOLI
10
Desa/Village PASAR GUNUNG SITOLI
Project Title
Sector
REVITALIZATION OF RSU GUNUNGSITOLI, NIAS
Health
All Kecamatans - Kab. NIAS All Desas
Community Base Health Program, Lolofitu Moi Subdistrict, District of Nias, N.Sumatra
All Kecamatans - Kab. NIAS All desas
(PO#4304) Supplementation with Vitamins and Minerals (SUM)
Health ; Infrastructure, International AID; Housing & Land; Institutional Development General Public Services Health Helen Keller International;
All Kecamatan
First Aid Training (Latihan Pertolongan Pertama)
Health
HEAL 200 GI
11
HEAL 81 IN
12
HEAL 74 IN
13
HEAL 91 IN
Partner (1st Level)
All Desas
Page 14 of 16
Mercy Malaysia; ACH (Aceh Concern on Humanity); BRR (Badan Rehabilitasi dan Rekonstruksi);
Johanniter-International Assistance / The Johanniter
Start Date
End Date
Key Performance Indicator
1-Mar-06
31 May 2007
(HEAL) Physical progress (%); (HEAL) Rehabilitation & Reconstruction-Hospitals (Number built/repaired)
1-Jun-05
1-Jun-07
(INFRA) Number of land titles issued
13-Jan-05
30-Apr-07
None
1-Jan-06
12/31/2007
(HEAL) Training health promotion (Number of personnel trained)
KPI Target
KPI Progress
100 1
Project Status
50 Ongoing 0
7
7 Completed
None
None Completed
250
250 Completed
Sector Date Total of Project Total of Organization
NO
1
2
3
4
5
: Social : December 01, 2006 : 12 : 11
Project
Design Status Ongoing Status Completed Status Suspended Status
Kecamatan
Desa/Village
:0 :7 :5 :0
Project Title
Sector
Partner (1st Level)
Start Date
End Date
Bantuan Sembako Untuk Masyarakat Aceh-Nias.
Social
ACH (Aceh Concern on Humanity); BRR (Badan Rehabilitasi dan Rekonstruksi); The Saudi Charity Campaign;
24 Oct 2005
24 Dec 2005
(SOCIAL) Number of people served
2
2 Completed
GUNUNG SITOLI LAHEWA
MUDIK; PASAR GUNUNG SITOLI LAHEWA;
Bantuan Pembangunan Tempat Ibadah
Religion
ACH (Aceh Concern on Humanity); BRR (Badan Rehabilitasi dan Rekonstruksi);
18 May 2006
18-Sep-06
(RELIG) Number of churchs built/repaired; (RELIG) Number of mosques built/repaired; (RELIG) Number of temple rebuilt/repaired; (RELIG) Physical progress (%) (SOCIAL) Number of people served
2
0 Ongoing
1
0
1
0
GIDO; LOLOFITU MOI; MANDREHE
Desa to be Defined
Nias: General Food Distribution
Kecamatan to be Defined - Kab. NIAS
Desa to be Defined
GUNUNG SITOLI
SAOMBO
Social
SOCI 39 IN
7
SOCI 64 LN
8
SOCI 68 IN
9
SOCI 73 IN
10
SOCI 92 UN
11
SOCI 58 LN
12
SOCI 77 IN
300 26.292
0 26.292 Completed
World Vision;
01 May 2005
1-Jul-05
Child Protection for Nangroe Social Aceh Darrussalam and North Sumatra Provinces
UNICEF;
1-Jan-05
1-Jan-06
(SOCIAL) Number of people trained (e.g. community leadership, peace education, social research methodology)
0
0 Ongoing
FK&P Trauma Healing Banda Education; Health Aceh & Nias IN-16-02
FKP-Indonesia (Forum Kemanusiaan & Persaudaraan Indonesia);
1-Mar-05
1-Mar-06
(EDUC) Number of beneficiaries/participants on vocational training; (HEAL) Training-Mental Health Service (Number of Personnel Trained) (HEAL) Service-Mental HealthProgram (Number of Beneficiaries); (SOCIAL) Number of people trained (e.g. community leadership, peace education, social research methodology) '-- KPI to be Defined
2
2 Completed
SOCI 37 IN
6
Project Status
KPI Progress
AFULU
SOCI 116 GI
SOCI 13 UN
KPI Target
AFULU SOCI 103 LN
SOCI 12 IN
Key Performance Indicator
GUNUNG SITOLI
MUDIK
Support Programme for the Health;Social Tsunami Victims in Aceh and Nias
KOTIB NAD-SUMUT/ Dina Kartika 1-Feb-05 Sari;
1-Feb-06
GUNUNG SITOLI
Desa to be Defined
CHILD ABUSE & EXPLOITATION (PUSAKA)
PUSAKA;
16 Aug 2005
16 Aug 2006
All Kecamatans - Kab. NIAS
All Desas
Recovery trauma counseling, Education;Health education and psychosocial children, youth and parents.
Helping Hands Foundation;
1-Jun-05
1-Jun-07
(HEAL) Assessment activities (Number);
GUNUNG SITOLI LAHEWA
PASAR GUNUNG SITOLI LAHEWA
Proyek bantuan kebutuhan sandang pangan
Social
Yayasan Sheikh Eid Bin Mohammad Al Thani;
4-Apr-05
29 May 2009
(SOCIAL) Number of people served
All Kecamatans - Kab. NIAS
All Desas
Emergency Distribution of Tents and Relief Items
Social
UNHCR;
4-Apr-05
31 Dec 2005
(SOCIAL) Equipment & supplies provided (Value USD)
MANDREHE
Onolimburaya, Onozalukhu You, Sisarahili II, Tumori
Institutional Development General Public Services
YTBI (Yayasan Tanggul Bencana 1-Jan-05 di Indonesia);
1-Jan-07
(INST-GPS) Number of compliance guidelines developed for local government
Kecamatan to be Defined - Kab. NIAS
Kecamatan to be defined
PROGRAM PENANGGULANGAN BENCANA GEMPA BUMI DAN TSUNAMI ACEH DAN NIAS A focus on older people: rehabilitation and development programme for Aceh and Nias Island
Health ; Social
HelpAge International;
29 May 2008
(SOCIAL) Number of people trained (e.g. community leadership, peace education, social research methodology)
Education; Social
Page 15 of 16
29-Apr-06
1,44
1,44
8
0 Ongoing
0
0 Ongoing
18
18 Completed
1000
1000 Completed
900,000
900,000 Completed
None
None Ongoing
20,000
0 Ongoing
Sector Date Total of Project Total of Organization
NO
1
2
Project
: Institution : December 01, 2006 :5 :5
Kecamatan
Desa/Village
INST 30 Multi
Partner (1st Level)
Start Date
End Date
Key Performance Indicator
Administrative and Other Costs; Institutional Development - General Public Services
UNDP;
1-Jan-06
31 Dec 2009
'-- KPI to be Defined
MANDREHE
All Desas
PROGRAM PENANGGULANGAN BENCANA GEMPA BUMI DAN TSUNAMI ACEH DAN NIAS
Institutional Development Public Order and Safety
YTBI (Yayasan Tanggul Bencana di Indonesia);
1-Jan-05
1-Jan-07
All Desas
INST 36 UN
5
Sector
Support to Strengthen the Capacity and Role of Civil Society Organizations in the Recovery of Communities in Aceh and Nias
INST 33 LN
INST 41 IN
Project Title
Desa to be Defined
INST 26 UN
4
:1 :3 :1 :0
Kecamatan to be Defined Kab. NIAS
Kecamatan to be Defined Kab. NIAS 3
Design Status Ongoing Status Completed Status Suspended Status
Poverty alleviation and restoring Infrastructure, Housing & livelihoods in the island of Nias through Land Micro Hydro based Community Development Centre (CDC) for common facilities
UNIDO (United Nations 01 Oct 2005 Industrial Development Organization);
GUNUNG SITOLI
All Desas
Gunung Sitoli public aula (town hall)
Institutional Development General Public Services; Unallocated
LAZARUS HILFSWERK;
Kecamatan to be Defined Kab. NIAS
All desas
Support for Poor and Disadvantaged Areas Project, Aceh and Nias
Institutional Development General Public Services; Institutional Development Public Order and Safety
Ministry for 26-Apr-06 Development of Disadvantaged Areas;
Page 16 of 16
01 Aug 2005
1-Jan-07
6-Sep-06
26-May-06
KPI Progress
KPI Target
Project Status
5
0 Ongoing
(INST) Number of civil servants training courses assessed and strengthened; (INST) Number of civil servants who have received training
2.010
0 Ongoing
(INFRA) Number of communication distribution facilities rehabilitated; (INFRA) Number of electrical distribution facilities rehabilitated; (INFRA) Number of public buildings built/repaired (INST) Number of civil servants who have received training
5
0 Ongoing
1
0
None
707
0
1
0
1
1 Completed
None
None Design
PROGRESS REPORT OF NON GOVERNMENT ORGANIZATIONS IN SOUTH NIAS DISTRICT As of December 01, 2006
SUMMARY : Total of Project
:
41
Total of Implementer Partner in Nisel
:
37
Project Status Design
:
2
Ongoing
:
28
Completed
:
8
Suspended
:
0
Procurement
:
0
Sector Date Total of Project Total of Organization
NO
Project
: Infrastructure,Housing & Land : December 01, 2006 : 12 : 12 Kecamatan
Design Status Ongoing Status Completed Status Suspended Status Desa/Village
Partner (1st Level)
Start Date
End Date
Project Status
Spatial planning
11 May 2006 11 May 2008
Aceh-Nias Settlements Support Programme (ANSSP).
Infrastructure, Housing & Land
UN-HABITAT;
1-Apr-05
21 Dec 2006
(INFRA) Number of houses built;
All Kecamatans All Desas Kab. NIAS SELATAN
Nias Roads, Transport & City Development Planning and Design.
Infrastructure, Housing & Land
ACH (Aceh Concern on Humanity); BRR (Badan Rehabilitasi dan Rekonstruksi);
3-Jan-06
28-Feb-09
LAHUSA
Multi-Purpose Buildings as Community Centers in Tsunami and Earthquake Affected Communities
Infrastructure, Housing & Land
World Harvest;
1-Mar-05
31 Dec 2006
All Kecamatans All Desas Kab. NIAS SELATAN
Collaborative Rehabilitation Nias (CRN) - Timber Supply for Rehabilitation in Nias Island
Infrastructure, Housing & Land
UNHCR;
20 Aug 2005 31 Dec 2006
(INFRA) Number of building material supplied (USD)
TELUK DALAM
HILISIMAETANO
Hili''aurifa Bridge
Infrastructure, Housing & Land
Caritas Sibolga;
16-Mar-06
31/Des/2006
(INFRA) Number of bridges rebuilt
1
1 Ongoing
AMANDRAYA
HILIFADOLO
Potable Water for Tsunami Victims
Infrastructure, Housing & Land
WISH (Water Initiative for Securing Health);
1-Apr-06
30-Jun-06
(INFRA) Water Supply - Number of water distribution facilities rehabilitated (EDUC) Number of teachers trained;
2
0 Ongoing
0
0
LOLOMATUA
HILISIMAETANO HILIGANOWO
2
INFRA 153 IN
TELUK DALAM ORAHILI FAU Kecamatan to be Desa to be Defined Defined - Kab. NIAS SELATAN
3
INFRA 165 UN
4
INFRA 276 GI
5
INFRA 289 IN
6
INFRA 310 UN
7
INFRA 318 IN
8
INFRA 331 IN
9
INFRA 335 IN
TELUK DALAM
PASAR T. DALAM
LAHUSA
TNO Built Environment and Geosciences;
TELUK DALAM
All Desas
HOME & LIVELYHOOD .
GOMO
All Desas - GOMO; Desa to be Defined GOMO;HILIANAA GOMO; LAWA-LAWALUO GOMO; ORAHILI GOMO; SIFAROASI GOMO;
Nias Rehabilitation and Education; Health ; Development Programme (CPR15 Infrastructure, Housing & - PR91) Land
INFRA 344 IN LAHUSA
Economic Development; Infrastructure, Housing & Land
(INFRA) Number of houses built (EDUC) Number of elementary schools built/repaired;
KPI Progress
KPI Target
COASTPLAN Aceh-Nias – using risk maps for strategic planning and sustainable development, increasing geohazard preparedness and awareness
INFRA 103 LN
21-Dec-07
Key Performance Indicator
1-Jul-05
SISOBAHILI HURUNA TUHEMBERUA
10
Sector
School and House Reconstruction Education; Infrastructure, LPAM-Nias (Lembaga Pencerahan Housing & Land & Advokasi Masyarakat - Nias);
LOLO WA'U
1
Project Title
:1 :8 :3 :0
(INST) Number of civil servants who have received training; (SPAT) maps have been proceed (percentage)
55
0 Design
100
0
0 Ongoing
(INFRA) Length of roads rebuilt/constructed (Km);
1
0 Ongoing
(INFRA) Number of public buildings built/repaired
1
1 Completed
5,550,000
5,550,000 Completed
7-Feb-05
30-Jul-10
(ECON) Number of fishing vessels provided/replaced; (INFRA) Number of houses built
PMI (Palang Merah Indonesia Indonesian Red Cross);
1-Jul-05
31 Dec 2007
(EDUC) Number of elementary schools built/repaired; (HEAL) Service-Health Promotion-Program (Number of Beneficiaries); (INFRA) Number of houses built; (INFRA) Number of houses occupied; (INFRA) Physical progress for houses built (%)
Page 2 of 9
38 Ongoing 4
63
Kerkinactie-Holland;
Desa to be Defined LAHUSA; FETEZOU; LAHUSA ;SIHAREO;
125 4
165 44 5
120 Ongoing 33 0 Ongoing
16.300
0
730 677 700
40 0 75
NO
Project
Kecamatan
Desa/Village
Project Title
Sector
Partner (1st Level)
All Kecamatan - Kab. All Desas - All Kecamatans; Sektor Air Belanda dukung Sektor Infrastructure, Housing & Nias Selatan; HILISIMAETANO Air Sumatera Wilayah Utara (SAB- Land TELUK DALAM SAS)
11
Desa to be defined
INFRA 1 Multi
GOMO 13
1-Apr-05
End Date 1-Apr-07
INFRA 99 Bilat
Kecamatan to be Defined 12
SAB-SAS;
Start Date
INFRA 385 LN
HILIMBARUZO (GOMO)
Community Water Services and Health Aceh/Nias-North Sumatra Project
Health ; Infrastructure, Housing & Land
Road Construction in Hilimbaruzo Infrastructure, Housing & Land
Ministry of Health / ADB;
Caritas Sibolga/Caritas Network
Page 3 of 9
01 May 2005 01 May 2009
1/4/2006
31/12/2006
Key Performance Indicator
KPI Progress
KPI Target
Project Status
(INFRA) Water Supply - Number of houses supplied with water; (INFRA) Number of government buildings built/repaired; (INFRA) Length of bridges built (m); (INFRA) Human Waste Management - Number of public toilet facilities constructed/rehabilitated; (INFRA) Water Supply - Length of primary or secondary water mains rehabilitated/provided
0
0 Ongoing
0
0
0 0
0 0
0
0
(HEAL) Service-Environmental Health-Health Care Waste Management-Program (Number of Beneficiaries);
0
0 Ongoing
(INFRA) Number of latrines built
0
0
(INFRA) Length of roads rebuilt/constructed
1
1 Completed
Sector Date Total of Project Total of Organization
NO
Project
: Economy : December 01, 2006 : 10 :9
Kecamatan TELUK DALAM
1
ECON 181 IN
AMANDRAYA; LAHUSA; TELUK DALAM
2
3
Design Status Ongoing Status Completed Status Suspended Status
Desa/Village BAWODOBARA; BAWOLOWALANI; BAWOMATALUO; BOTOHILITANO; HILIALAWA; HILIGEHO; LAGUNDRI; PASAR T. DALAM; LOLOMOYO (AMANDRAYA); SILIMABANUA; LAGUNDRI
Project Title
:1 :7 :0 :0
Sector
Partner (1st Level)
Start Date
End Date
Delivering a Sustainable Livelihood Small Grant Programme in Aceh & Nias
Economic Development
ACE (Association for Community Empowerment);
25 Oct 2005
25 Dec 2006
(ECON) Number of micro business developed
Sustainable tourism – Eliminating poverty in Nias (Indonesia) - Coastal, agriculture and tourism project (CAT)
Economic Development
Istituto Agronomico per l'Oltremare;
8-Jan-07
31 Dec 2009
(ECON) Area of agricultural land rehabilitated (Hectares); (ECON) Area of coastal (inshore, beach, corals) restored (Hectares); (ECON) Area of fishponds/tambak restored (Hectares); (ECON) Area of forest protected/rehabilitated (Hectares); (ECON) Area of mangrove restored (Hectares); (ECON) Employment programme implemented (Number of beneficiaries); (ECON) Number of participants of vocational training; (ECON) Number of people served; (ECON) Number of study/survey report; (ECON) Number of vocational (ECON) Number of loans provided to micro business (loan < 5 million)
ECON 280 IN
TELUK DALAM
BAWODOBARA;
Upgrading program for small Economic and medium enterprises (SME) Development
PUM (Netherlands Senior Experts);
1-Jun-05
1-Jun-10
AMANDRAYA; GOMO; TELUK DALAM
HILITOTAO; PASAR T. DALAM; SIFAROASI GOMO
Nias Recovery Program: An Integrated Community Based Approach.
ICMC (International Catholic Migration Commission );
1-Jan-06
30-Apr-07
ECON 287 IN
4
ECON 292 IN
5
ECON 82 UN
Kecamatan to be Defined Kab. NIAS SELATAN
Desa to be Defined
Key Performance Indicator
ILO Aceh programme: Labour Based Rural Infrastructure Rehabilitation
Economic Development; Social
Infrastructure, Housing & Land
ILO (International Labour Organization);
Page 4 of 9
03 May 2005
30-Mar-08
(ECON) Amount of seeds and fertilizer provided (Kg); (ECON) Boat building facilities completed (unit); (ECON) Equipment and supplies provided (Value USD); (ECON) Number of business developed; (ECON) Number of livestock provided; (ECON) Number of people served; (ECON) Number of sets of fish processing equipment provided; (ECON) Number of traditional markets established; (SOCIAL) Number of people served; (SOCIAL) Number of Women and Children or Community Receiving Psychosocial Program (INFRA) Length of roads rebuilt/constructed (Km)
KPI Target KPI Progress
Project Status
378
0 Ongoing
60
0 Ongoing
30
0
30
0
30
0
30
0
30
0
90
0
1.500 9
0 0
90 8
0 4 Ongoing
210
0 Ongoing
15
0
301.000
0
20 50 60 80 50 1000 9000
0 0 0 0 0 0 2500
22
0 Ongoing
NO
6
Project
Desa/Village
ECON 6 Multi
8
ECON 93 GI
9
ECON 123 IN
Project Title
Sector
Partner (1st Level) ILO (International Labour Organization);
TELUK DALAM
All Desas
ILO Aceh Programme: Local Economic Recovery and Development to Rebuild Livelihoods and Employment Opportunities
Economic Development
TELUK DALAM
Siwalawa
Economic Development
Ministry of Settlement and Regional Infrastructure;
Kecamatan to be Defined
All desas
Economic Development
Ministry of Agriculture (MOA);
TELUK DALAM
HILIZIHONO
Green Coast Project Nature and People after the Tsunami
TELUK DALAM
BAWOMATALUO; BOTOHILITANO; LAGUNDRI
Support to Redevelopment of Tourism whilst Protecting the Cultural Heritage
ECON 84 UN
7
10
Kecamatan
Start Date
End Date
Key Performance Indicator
KPI Target KPI Progress
23-Jun-05
31 Dec 2006
(ECON) Number of micro business developed
01 May 2006
1-Nov-08
(ECON) Length of irrigation canal new/rehabilitated (Km)
0
0 Design
Earthquake & Tsunami emergency Support Project (ETESP) Agriculture Component
1-Jul-05
1-Jun-08
(ECON) Number of agricultural machines provided
6
0 Ongoing
Economic Development;
Wetlands InternationalIndonesia / NOVIB
7-Oct-06
1-Oct-08
None
None
None Ongoing
Economic Development;
UNDP/UN Flash Appeal
7-Jun-06
31-Dec-06
(ECON) Number of participants of vocational training; (ECON) Employment programme implemented (Number of beneficiaries); (ECON) Number of study/survey report;
150
0 Ongoing
150
0
50
0
ECON 312 UN
Page 5 of 9
50
Project Status
0 Ongoing
Sector Date Total of Project Total of Organization
NO
Project
1
EDUC 146 LN
2
3
4
5
6
7
8
9
EDUC 150 LN
Kecamatan
EDUC 23 UN
Desa/Village
Project Title
Sector
Partner (1st Level)
Start Date
TUINDRAO
Reconstruction of the Parish Complex in Amandraya (phase I)
LAHUSA;
LAHUSA SILIMABANUA
PKPA (Pusat Kajian dan Perlindungan Anak); 01 Nov 2005
LOLOMATUA;
AMOROSA TUHEMBERUA
DEALING WITH THE Education; Health FUTURE OF CHILDREN POST THE EARTHQUAKE IN NIAS
Education; Social
Caritas Sibolga;
End Date
01/Maret/2006 30-Nov-06
01 Nov 2007
Key Performance Indicator (EDUC) Number of kindergarten built/repaired; (SOCIAL) Number of dormitory rebuilt/new (EDUC) Number of beneficiaries/participants on vocational training; (EDUC) Number of people served; (EDUC) Number of teachers trained;
KPI Target
KPI Progress 1 1
850 2000 30
Project Status
1 Completed 1 335 Ongoing 1200 25
TELUK DALAM
HILIGEHO
TELUK DALAM
BAWODOBARA; BAWOMATALUO; BAWOZAUA; BOTOHILITANO
raise up the future generation
Education
Yayasan Bina Mandiri Indonesia;
2-Mar-06
31 May 2006
(EDUC) Number of classrooms provided with furniture
31
0 Ongoing
All Kecamatans Kab. NIAS SELATAN
All Desas
Emergency Support for Basic Education
Education
UNICEF;
1-Jan-05
1-Jan-10
(EDUC) Number of temporary schools built; (EDUC) School equipment & supplies (Value USD); (EDUC) Number of people served;
10 120.960
0 Ongoing 120.960
Kecamatan to be Defined - Kab. NIAS SELATAN
Desa to be Defined
Basic Education
Education
UNICEF;
GOMO TELUK DALAM
All Desas
Rehabilitation and Reconstruction of General Senior Secondary Schools (SMA)
Education
KfW; PEM GmbH Duesseldorf Germany;
15-Sep-05
TELUK DALAM
Desa to be Defined
Education
Rehabilitation and Reconstruction of Senior Secondary Vocational Schools (SMK)
GTZ/KFW
Lahusa; Teluk Dalam
Bawozihono; Lagundri
Education
Program penanggulangan bencana gempa bumi dan tsunami Aceh dan Nias
GOMO
SIFALAGO SUSUA
Reconstruction of an elementary school in Hilizamurugo (SDN 075105)
Education
EDUC 70 Bilat
EDUC 60 Bilat
EDUC 110 LN
EDUC 199 LN
:0 :6 :2 :0
AMANDRAYA
EDUC 177 LN
EDUC 188 UN
Design Status Ongoing Status Completed Status Suspended Status
: Education : December 01, 2006 :9 :7
58.560
58.560
(EDUC) Number of elementary schools built/repaired; (EDUC) Number of teachers trained
0
0 Ongoing
31 Dec 2007
(EDUC) Number of senior high schools built/repaired
1
0 Ongoing
1-Jul-05
1-Jan-09
None
None
None Ongoing
YTBI / ACT
1-Jan-05
1-Jan-07
None
None
None Ongoing
Caritas Sibolga/Kindermissionwerk
01/Mei/2006
29-Sep-06
(EDUC) Number of elementary schools built/repaired (EDUC) Physical progress (%)
Page 6 of 9
1
1 Completed
1
1
Sector Date Total of Project Total of Organization
NO
Project
1
HEAL 121 LN
2
: Health : December 01, 2006 :5 :5 Kecamatan
Design Status Ongoing Status Completed Status Suspended Status Desa/Village
Project Title
:0 :3 :2 :0 Sector
Partner (1st Level)
Start Date
End Date
LAHUSA TELUK DALAM
LAHUSA Proyek Pendidikan dan Kesehatan BOTOHILITANO; Keluarga Masyarakat Nias MADULA; SISARAHILI II
Health
PESADA;
01 Nov 2005
31 Dec 2008
(HEAL) Service-Health PromotionProgram (Number of Beneficiaries)
PULAU-PULAU BATU
PASAR PULAU TELLO
Health
GBI Medan; MAP International;
22-Feb-06
22-Feb-08
(HEAL) Rehabilitation & ReconstructionHospitals (Number built/repaired); (HEAL) Service-Health PromotionProgram (Number of Beneficiaries); (HEAL) Service-Other CurativeProgram (Number of Beneficiaries) (HEAL) Physical progress (%)
Tello Hospital, Mobile Clinic and Community Health Program
HEAL 179 LN
3
HEAL 89 IN
4
HEAL 74 IN
5
HEAL 91 IN
Key Performance Indicator
TELUK DALAM
HILISIMAETANO
NIAS-LUKAS Teluk Dalam Hospital Project
Health
LDSC (Latter-Day Saint Charities);
1-Apr-05
1-Jul-05
(HEAL) Equipment & Supplies- Others (Value USD)
All Kecamatan
All desas
Supplementation with vitamins and minerals (SUM)
Health
Helen Keller International
13-Jan-05
30-Apr-07
None
All Kecamatan
All Desas
First Aid Training (Latihan Pertolongan Pertama)
Health
JohanniterInternational Assistance / The Johanniter
1-Jan-06
12/31/2007
(HEAL) Training health promotion (Number of personnel trained)
Page 7 of 9
KPI Target
KPI Progress
Project Status
200
0 Ongoing
1
0 Ongoing
400
10
4000
100
100 93.725
None
250
80 93.725 Completed
None Ongoing
250 Completed
Sector Date Total of Project Total of Organization
NO
Project
: Social : December 01, 2006 :3 :3 Kecamatan TELUK DALAM
1
Design Status Ongoing Status Completed Status Suspended Status Desa/Village LAGUNDRI; PASAR T. DALAM
Project Title Bantuan Pembangunan Tempat Ibadah
:0 :2 :1 :0 Sector Religion
SOCI 116 GI
2
SOCI 53 LN
3
SOCI 92 UN
Partner (1st Level) ACH (Aceh Concern on Humanity); BRR (Badan Rehabilitasi dan Rekonstruksi);
Start Date
End Date
Key Performance Indicator
18 May 2006
18-Sep-06
(RELIG) Number of churchs built/repaired; (RELIG) Number of mosques built/repaired; (RELIG) Number of temple rebuilt/repaired; (RELIG) Physical progress (%)
LAHUSA; TELUK DALAM
BAWOZIHONO; LAGUNDRI
PROGRAM Religion PENANGGULANGAN BENCANA GEMPA BUMI DAN TSUNAMI ACEH DAN NIAS
YTBI (Yayasan Tanggul Bencana di Indonesia);
1-Jan-05
1-Jan-07
All Kecamatans - Kab. NIAS SELATAN
All Desas
Emergency Distribution of Tents and Relief Items
UNHCR;
4-Apr-05
31 Dec 2005
Social
Page 8 of 9
'-- KPI to be Defined
(SOCIAL) Equipment & supplies provided (Value USD)
KPI Target
KPI Progress
Project Status
1
0 Ongoing
1
0
1
0
200
0
0
900,000
0 Ongoing
900,000 Completed
Sector Date Total of Project Total of Organization
NO
Project
1
INST 26 UN
2
INST 66 UN
: Institutional : December 01, 2006 :2 :1 Kecamatan
Design Status Ongoing Status Completed Status Suspended Status Desa/Village
:0 :2 :0 :0
Project Title
Sector
Partner (1st Level)
Start Date
End Date
Key Performance Indicator
Kecamatan to be Defined
Desa to be Defined
Support to Strengthen the Capacity and Role of Civil Society Organizations in the Recovery of Communities in Aceh and Nias
Institutional Development - General UNDP; Public Services
1-Jan-06
31 Dec 2009
'-- KPI to be Defined
TELUK DALAM
All Desas
Teluk Dalam Village-based Disaster Preparedness Project under the UN Joint Programming
Institutional Development
8-Jan-06
31-Dec-06
(INST) Number of facilitators recruited for community participation and empowerment
Page 9 of 9
UNDP;
KPI Target
Project Status 0 Ongoing
KPI Progress 5
200
0 Ongoing