ARAHAN DIREKTUR JENDERAL PKP2TRANS PADA ACARA
Rapat Persiapan Pelaksanaan Program PKP2Trans Tahun 2017 Jakarta, 6 Desember 2016 DITJEN PENYIAPAN KAWASAN DAN PEMBANGUNAN PERMUKIMAN TRANSMIGRASI
KEMENTERIAN DESA, PDT, DAN TRANSMIGRASI
I. CAPAIAN KINERJA PROGRAM PKP2TRANS TAHUN 2016 (Berdasarkan Data OM-SPAN 5 Desember 2016)
2
A. KURVA “S” RENCANA (TARGET) DAN REALISASI PENYERAPAN ANGGARAN TAHUN 2016 Posisi : 5 Desember 2016 96,0 100,0
100,0 90,0
87,0
80,0
70,0
70,0
50,0
42,0 45,91
25,0 17,0
30,0 20,0 0,0
54,2
33,0
40,0
10,0
68,03
55,0
60,0
0,4 0,7
35,00
10,0
5,5 2,0
3,6
6,17
Deviasi, 27,97%
8,5
16,8
RENCANA SERAPAN 2016
23,34
REALISASI 2016
Realisasi Pagu Efektif Rp.608.437.140.000 (78,97%) 3
B. REALISASI ANGGARAN SATKER PUSAT DAN DAERAH TAHUN ANGGARAN 2016
SATKER
PAGU (Rp. 000)
REALISASI KEUANGAN (Rp.000)
%
% Fisik
PUSAT
179.126.402
112.435.001
62,77 65,50
DAERAH
527.152.635
368.040.671
69,82 72,50
82.113.279
47.399.563
57,72
60,20
KABUPATEN
445.039.356
320.641.107
72,02
75,10
JUMLAH
706.279.037
480.475.673
PROVINSI
68,03 70,35
Sumber : OM SPAN 5 Desember 2016
4
C. REALISASI ANGGARAN BERDASARKAN KEGIATAN PAGU (Rp.000)
No. 1
2
3
4
5
6
KEGIATAN DUKUNGAN MANAJEMEN DAN DUKUNGAN TEKNIS LAINNYA DITJEN PKP2TRANS
AKHIR TOTAL
PUSAT DAERAH PENATAAN PERSEBARAN PENDUDUK TOTAL PUSAT DAERAH PEMBANGUNAN PERMUKIMAN TOTAL TRANSMIGRASI PUSAT DAERAH PENYEDIAAN TANAH TRANSMIGRASI TOTAL PUSAT DAERAH PERENCANAAN PEMBANGUNAN DAN TOTAL PENGEMBANGAN KAWASAN TRANSMIGRASI PUSAT DAERAH PEMBINAAN POTENSI KAWASAN TOTAL TRANSMIGRASI PUSAT DAERAH TOTAL PUSAT + DAERAH
101.721.586
EFEKTIF
REALISASI (Rp.000) KEUANGAN
96.987.161 81.781.679
58.895.742 42.825.844 72.345.217 60.220.482 12.812.849 59.532.368 487.106.416 411.504.928
% EFEKTIF 80,40 84,32
%
48.327.657 33.454.022 36.804.372 10.466.973 26.337.398 327.582.707
82,06 78,12 50,87 81,69 44,24 67,25
77.092.844 410.013.572 10.322.410 5.684.070 4.638.340 15.659.468
31.075.395 296.507.312 9.607.096 7.572.476 4.483.678 3.088.797 11.951.517 10.569.797
40,31 72,32 73,36 78,88 66,59 67,50
88,44
10.818.855 4.840.613 19.123.940
6.234.660 4.335.136 18.165.955 16.164.640
57,63 89,56 84,53
88,98
13.822.042 11.846.638 5.301.898 4.318.002 706.279.037 608.437.139 480.475.671
Catatan : Pagu Efektif 2016 = Pagu 2016 di kurangi Dana Blokir
85,71 81,44 68,03
61,12
79,61
0,00
78,97 5
D. PROGRES FISIK PROGRAM PKP2TRANS TAHUN 2016 Posisi : 5 Desember 2016
NO 1
2
3 4 5 6
KEGIATAN
SATUAN
Penataan Persebaran Penduduk SPP KK Penempatan KK Pembangunan Permukiman Transmigrasi RTJK Unit SAB Standar Unit Fasilitas Umum (Fasum) Unit Jalan Km Jembatan M Pembukaan Lahan Ha Penyediaan Tanah Transmigrasi (HPL) Ha Perencanaan Pembangunan dan Dokumen Pengembangan Kawasan Transmigrasi Penetapan Kawasan Transmigrasi Kawasan Dukungan Manajemen dan Teknis Ditjen Bulan PKP2Trans Layanan
PROGRAM TARGET
REALISASI
(%)
5.277 5.277
3.341 63,31 1.414 26,80
4.963 1.159 103 237,7 896 4.470,4 15.000
4.412 88,90 882 76,10 78 76,09 205,53 86,48 661,43 73,82 3.320,25 74,27 11.147,2 74,31
9
7 77,77
30
26 86,66
12
11 91,666
II. RENCANA KERJA PROGRAM PKP2TRANS TAHUN 2017
7
A. ALOKASI ANGGARAN DITJEN PKP2TRANS TAHUN 2017 Pagu Alokasi Anggaran Ditjen PKP2Trans (Surat Menteri Desa, PDT, dan Transmigrasi No. S-814/M-DPDTT/10/ 2016) sebesar Rp.373.434.149.000,- mendukung Program Pembangunan Permukiman dan Penempatan Transmigrasi sejumlah 1.270 KK.
8
B. ALOKASI ANGGARAN DITJEN PKP2TRANS 2017 BERDASARKAN SATKER PUSAT/DAERAH PUSAT/ DAERAH
PUSAT; 31,89%
ALOKASI
DAERAH; 68,11%
PROV; 10,70%
KAB; 89,30%
PUSAT (6 Satker) > Dit. P3KT
ANGGARAN (X Rp. 1.000.-)
119.859.990 10.086.630
> Dit. PTT
9.040.000
> Dit. PPT
15.007.360
> Dit. PPP
9.071.040
> Dit. BPKT
6.380.846
> SETDITJEN
70.274.114
DAERAH
253.574.159
> PROVINSI (23 Satker)
30.170.397
> KABUPATEN (31 Satker)
223.403.762
TOTAL
373.434.149 10
C. ALOKASI ANGGARAN DITJEN PKP2TRANS 2017 BERDASARKAN KEGIATAN No.
KEGIATAN
DUKUNGAN MANAJEMEN DAN TEKNIS LAINNYA DITJEN PKP2TRANS 2. PENATAAN PERSEBARAN PENDUDUK 1.
3. PEMBANGUNAN PERMUKIMAN TRANSMIGRASI 4. PENYEDIAAN TANAH TRANSMIGRASI
PAGU (Rp.000)
95.666.939
22.912.180 223.647.192 11.307.968
PERENCANAAN PEMBANGUNAN DAN PENGEMBANGAN KAWASAN TRANSMIGRASI
13.369.914
6. PEMBINAAN POTENSI KAWASAN TRANSMIGRASI
6.529.956
5.
JUMLAH
373.434.149 10
D. PRIORITAS PEMANFAATAN ANGGARAN TAHUN 2017 1. Penyelesaian dari carry over program akibat pelaksanaan Inpres 8 Tahun 2016, meliputi 6 satker : 1) Dinas Nakertrans Kab. Halmahera Tengah 2) Dinas Nakertrans Kab. Halmahera Timur 3) Dinas Nakertrans Kab. Kepulauan Sula 4) Dinas Nakertrans Kab. Gorontalo 5) Dinas Nakertrans Provinsi Sulawesi Barat 6) Dinas Duknakertrans Prov. Papua Barat
11
Lanjutan PRIORITAS PEMANFAATAN ANGGARAN TAHUN 2017 2. Pemenuhan Infrastruktur permukiman dan kawasan transmigrasi, meliputi 9 Satker: 1) Dinas Sosnakertrans Kab. Aceh Besar. 2) Dinas Nakertrans Kab. Banyuasin; 3) Dinas Sosnakertrans Kab. Sanggau; 4) Dinas Sosnakertrans Kab. Sintang; 5) Dinas Nakertrans Kab. Toli-Toli ; 6) Dinas Nakertrans Kab. Donggala; 7) Dinas Dukcapilsosnakertrans Kab. Morowali Utara; 8) Dinas Nakertrans Kab. Sumba Timur; 9) Dinas Nakertrans Kab. Halmahera Timur. 12
Lanjutan PRIORITAS PEMANFAATAN ANGGARAN TAHUN 2017 3. Pembangunan Permukiman dan Penempatan Transmigrasi Baru 1.270 KK sebesar, meliputi :
1) Sum-Bar, Kab. Darmasraya, lokasi Padang Hilalang SP.2 : 25 KK. 2) Sum-Sel, Kab. Banyuasin, lokasi Sriagung : 60 KK, dan Kab. Lahat, lokasi Keban Agung : 50 KK. 3) Kal-Bar, Kab. Bengkayang. Lokasi Semunying : 150 KK, Kab. Sanggau, lokasi Sungai Beruang : 50 KK, Kab. Sintang, lokasi Serawai : 75 KK. 4) Kaltara, Kab. Bulungan, lokasi Sepunggur : 100 KK 5) Gorontalo, Kab. Gorontalo, lokasi Bukit Aren : 50 KK, Kab. Gorontalo Utara, lokasi Motihelumo : 25 KK 13
Lanjutan PRIORITAS PEMANFAATAN ANGGARAN TAHUN 2017 6) Sul-Sel, Kab. Sidrap, lokasi Wala : 25 KK 7) Sul-Teng, Kab. Tojo Una-Una lokasi Uetangko/ Uematopa : 50 KK, Kab. Morowali, lokasi Kaibera : 50 KK. 8) Sul-Tera, Kab. Muna Barat, lokasi Lakabu/ Momuntu : 50 KK, Kab. Kolaka Timur, lokasi Tongauna : 50 KK, Kab. Konawe, lokasi Parudongka: 50 KK. 9) Sul-Bar, Kab. Mamasa, lokasi Rano : 50 KK, Kab. Polman, lokasi Pirantapiko : 25 KK. 10) NTT, Kab. Nagekeo, lokasi Ikeseo Gezu : 50 KK, Kab. Bellu, lokasi Sanabibi : 50 KK. 11) Maluku Utara, Kab. Sula, lokasi Modapuhi : 35 KK 14
Lanjutan PRIORITAS PEMANFAATAN ANGGARAN TAHUN 2017 12) Papua, Kab. Kerom, lokasi Senggi SP. II : 50 KK, Kab. Merauke, lokasi Muting SP. XII : 50 KK. 13) Papua Barat, Kab. Manokwari Selatan, lokasi Dembek : 50 KK, Kab. Manokwari, lokasi Meyes : 50 KK.
15
E. JADWAL PEMBANGUNAN PERMUKIMAN TRANSMIGRASI (PELAKSANAAN DI DAERAH) TAHUN 2017 SELURUH PEKERJAAN KONTRAKTUAL HARUS SUDAH DITANDATANGANI
PATAN
100% STP/ SPP
PROSES PEMBANGUNAN FISIK JAN
FEBRUARI MARET
APRIL
MEI
JUNI
JULI
AGUS
SEPT
OKT
NOV
DES
• Bulan Juni 2017 seluruh pekerjaan Kontraktual harus sudah ditandatangani Kontraknya • Bulan September seluruh pekerjaan fisik harus sudah dapat diselesaikan dan fungsional • Bulan Oktober 2017 STP/ SPP harus sudah terbit • Bulan Oktober s.d Desember 2017 Penempatan transmigrasi harus sudah selesai dilaksanakan
16
JADWAL PENEMPATAN TRANSMIGRASI (PELAKSANAAN DI DAERAH) TAHUN 2017 PENEMPATAN TRANSMIGRAN PADA RUMAH KOSONG TAHUN 2015 HARUS SUDAH SELESAI DILAKSNAKAN PATAN PENDAFTARAN SELEKSI
100 %
SOSIALISASI ANIMO CATRANS
JAN
• • • • • •
FEB
MRT
APRIL
PELATIHAN
MEI
JUNI
JULI
AGUS
STP/ SPP
SEPT
OKT
NOV
DES
Sosialisasi Animo Catrans Pendaftaran Seleksi Pelatihan STP/ SPP Bulan Oktober 2017 Penempatan pada bulan Oktober s.d. Desember 2017 17
HAL-HAL PENTING YANG PERLU MENDAPAT PERHATIAN DAN DITINDAKLANJUTI Pekerjaan Carry Over Tahun 2016, sebelum dilakukan pembayaran, perlu dilakukan audit oleh Inspektorat Jenderal Kemendesa, PDT, dan Transmigrasi. Satker harus segera berkoordinasi dengan Inspektorat Jenderal guna melakukan pengecekan pekerjaan fisik di lapangan serta menyiapkan dukungan admistratif, seperti : Kontrak, Adendum Kontrak, BA Serah Terima Pekerjaan, dll yang dipandang perlu. Satker penerima Dana Tugas Pembantuan Tahun 2017 harus menandatangani Surat Kesanggupan Menerima Hibah Barang Milik Negara (BMN) yang dibiayai APBN Program PKP2Trans. Pengendalian Program PKP2Trans Tahun 2017, sesuai Kepmen Desa, PDT, dan Transmigrasi No. 50 Tahun 2016 tentang Pelaporan Dana Tugas Pembantuan Bidang PKP2Trans Berbasis Online, agar segera menunjuk petugas penyusun pelaporan dan disampaikan ke Sesditjen PKP2Trans guna penerbitan SK Dirjen. Kepada petugas akan dilakukan Bimtek Aplikasi E-Pelaporan PKP2Trans di Jakarta pada Bulan Januari/Februari Tahun 2017. Sesuai arahan Menteri seluruh pekerjaan Bidang PKP2Trans (Fisik/Non Fisik) untuk dapat diselesaikan pada bulan September / Oktober 2017. 18
Terima Kasih DITJEN PENYIAPAN KAWASAN DAN PEMBANGUNAN PERMUKIMAN TRANSMIGRASI
KEMENTERIAN DESA, PDT, DAN TRANSMIGRASI
19
LAMPIRAN
20
LAMPIRAN 1 Realisasi Anggaran Tahun 2016
21
REALISASI ANGGARAN SATKER PUSAT TAHUN 2016 POSISI 05 DESEMBER 2016
No Satker DITJEN PKP2Trans PUSAT SEKRETARIAT DIREKTORAT JENDERAL PENYIAPAN 1 KAWASAN DAN PEMBANGUNAN PERMUKIMAN TRANSMIGRASI 2 DIREKTORAT BINA POTENSI KAWASAN TRANSMIGRASI DIREKTORAT PERENCANAAN PEMBANGUNAN DAN 3 PENGEMBANGAN KAWASAN TRANSMIGRASI 4 DIREKTORAT PENYEDIAAN TANAH TRANSMIGRASI DIREKTORAT PEMBANGUNAN PERMUKIMAN 5 TRANSMIGRASI 6 DIREKTORAT PENATAAN PERSEBARAN PENDUDUK
Pagu Total Realisasi Total Persentase 706.279.037.000 480.475.673.224 68,03% 179.126.402.000 112.435.001.744 62,77% 58.895.742.000
48.327.657.181 82,06%
13.822.042.000
11.846.638.209 85,71%
10.818.855.000
6.234.660.409 57,63%
5.684.070.000
4.483.678.215 78,88%
77.092.844.000
31.075.394.440 40,31%
12.812.849.000
10.466.973.290 81,69%
REALISASI ANGGARAN SATKER DAERAH TAHUN 2016 POSISI 05 DESEMBER 2016 No
Satker DAERAH PROVINSI KABUPATEN
1 2 3 4 5 6 7 8 9 10
DINAS TENAGA KERJA DAN TRANSMIGRASI PROVINSI JAWA BARAT DINAS TENAGA KERJA DAN TRANSMIGRASI PROVINSI JAWA TENGAH DINAS TENAGA KERJA DAN TRANSMIGRASI PROVINSI YOGYAKARTA DINAS TENAGA KERJA, TRANSMIGRASI DAN KEPENDUDUKAN PROVINSI JAWA TIMUR DINAS SOSIAL, TENAGA KERJA DAN TRANSMIGRASI KABUPATEN ACEH BESAR DINAS SOSIAL, TENAGA KERJA DAN MOBILITAS PENDUDUK KAB. ACEH UTARA DINAS SOSIAL, TENAGA KERJA DAN TRANSMIGRASI KAB. ACEH SELATAN DINAS SOSIAL, TENAGA KERJA DAN TRANSMIGRASI KAB. BIREUN DINAS SOSIAL, TENAGA KERJA, DAN MOBILITAS PENDUDUK KAB. ACEH JAYA DINAS SOSIAL , TENAGA KERJA DAN TRANSMIGRASI KAB. NAGAN RAYA
Pagu Total
Realisasi Total
%
527.152.635.000
368.040.671.480
69,82%
82.113.279.000
47.399.563.598
57,72%
445.039.356.000
320.641.107.882
72,05%
4.471.375.000
2.165.004.693
48,42%
5.971.000.000
2.354.603.934
39,43%
3.176.448.000
1.982.183.600
62,40%
5.589.670.000
1.851.780.800
33,13%
5.579.514.000
3.983.101.660
71,39%
4.883.444.000
4.806.003.900
98,41%
3.401.311.000
2.004.478.019
58,93%
3.607.270.000
2.295.532.000
63,64%
4.373.180.000
3.331.145.412
76,17%
2.891.430.000
2.111.491.234
73,03%
No
Satker
Pagu Total
Realisasi Total Persentase
11
DINAS SOSIAL, TENAGA KERJA DAN TRANSMIGRASI KAB. PIDIE JAYA
4.033.820.000
3.863.449.500
95,78%
12
DINAS TENAGA KERJA DAN MOBILITAS PENDUDUK PROVINSI NAD
4.823.675.000
3.516.189.000
72,89%
13 DINAS SOSIAL DAN TENAGA KERJA KAB. PIDIE
2.609.943.000
1.711.050.490
65,56%
14
DINAS SOSIAL DAN TENAGA KERJA KAB. ACEH BARAT
3.919.171.000
3.581.500.657
91,38%
15
DINAS SOSIAL, TENAGA KERJA DAN TRANSMIGRASI KAB. ACEH TENGAH
3.770.701.000
3.430.866.718
90,99%
16
DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. BENER MERIAH
3.303.558.000
1.937.710.514
58,66%
17
DINAS SOSIAL TENAGA KERJA DAN TRANSMIGRASI KOTA SUBULUSSALAM
2.972.416.000
2.673.298.000
89,94%
18
DINAS TENAGA KERJA DAN TRANSMIGRASI PROVINSI SUMATERA UTARA
289.024.000
221.842.000
76,76%
19
DINAS TENAGA KERJA DAN TRANSMIGRASI PROVINSI SUMATERA BARAT
1.529.845.000
686.105.250
44,85%
20
DINAS SOSIAL, TENAGA KERJA DAN TRANSMIGRASI KAB. SIJUNJUNG
3.266.900.000
1.131.816.690
34,64%
No
Satker
Pagu Total
21
DINAS TENAGA KERJA DAN TRANSMIGRASI DAN KEPENDUDUKAN PROVINSI RIAU
2.656.700.000
1.395.112.100
52,51%
22
DINAS SOSIAL, TENAGA KERJA DAN TRANSMIGRASI PROVINSI JAMBI
864.424.000
608.180.000
70,36%
23
DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. LAHAT
6.083.448.000
5.526.242.250
90,84%
24
DINAS TENAGA KERJA DAN TRANSMIGRASI KABUPATEN OGAN KOMERING ILIR
7.374.649.000
6.681.348.233
90,60%
25 DINAS NAKER TRANS KABUPATEN BANYUASIN
7.199.021.000
6.618.219.900
91,93%
26
DINAS TENAGA KERJA DAN TRANSMIGRASI PROVINSI SUMATERA SELATAN
3.136.305.000
1.857.227.600
59,22%
27
DINAS TENAGA KERJA DAN TRANSMIGRASI PROVINSI LAMPUNG
1.891.481.000
1.023.964.800
54,14%
3.630.609.000
563.509.300
15,52%
5.878.888.000
3.645.475.100
62,01%
151.512.000
130.752.000
86,30%
DINAS TENAGA KERJA DAN TRANSMIGRASI PROVINSI KALIMANTAN BARAT DINAS SOSIAL, TENAGA KERJA DAN 29 TRANSMIGRASI KAB. SAMBAS DINAS SOSIAL, TENAGA KERJA DAN 30 TRANSMIGRASI KAB. KETAPANG 28
Realisasi Total Persentase
No
Satker
DINAS SOSIAL, TENAGA KERJA DAN TRANSMIGRASI KAB. KAYONG UTARA DINAS SOSIAL, TENAGA KERJA DAN 32 TRANSMIGRASI KAB. KUBU RAYA DINAS TENAGA KERJA, TRANSMIGRASI DAN 33 SOSIAL KAB. KAPUAS HULU 31
Pagu Total
Realisasi Total Persentase
10.817.604.000
6.790.305.914
62,77%
159.032.000
69.242.000
43,54%
7.088.706.000
5.343.418.600
75,38%
34 DINAS TRANSMIGRASI KAB. KAPUAS
9.486.729.000
8.906.564.452
93,88%
35
DINAS SOSIAL, TENAGA KERJA DAN TRANSMIGRASI KAB. BARITO TIMUR
157.558.000
114.714.000
72,81%
36
DINAS TENAGA KERJA DAN TRANSMIGRASI PROVINSI KALIMANTAN TENGAH
1.453.141.000
671.425.000
46,21%
37
DINAS TENAGA KERJA DAN TRANSMIGRASI PROVINSI KALIMANTAN SELATAN
1.143.296.000
641.959.968
56,15%
38
DINAS SOSIAL TENAGA KERJA DAN TRANSMIGRASI KAB.BARITO KUALA
156.460.000
122.778.000
78,47%
39
DINAS TENAGA KERJA DAN TRANSMIGRASI PROVINSI KALIMANTAN TIMUR
693.274.000
597.793.000
86,23%
24.837.553.000
23.693.388.000
95,39%
40 DINAS NAKERTRANS KAB. BULUNGAN
No 41
42
43 44
Satker DINAS TENAGA KERJA DAN TRANSMIGRASI PROPINSI SULAWESI UTARA DINAS SOSIAL, TENAGA KERJA DAN TRANSMIGRASI KABUPATEN BANGGAI KEPULAUAN DINAS TENAGA KERJA DAN TRANSMIGRASI PROVINSI SULAWESI TENGAH DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. POSO
Pagu Total
Realisasi Total Persentase
968.699.000
770.494.686
79,54%
2.521.010.000
2.227.216.400
88,35%
3.464.036.000
2.176.831.100
62,84%
166.402.000
126.711.800
76,15%
166.282.000
136.695.200
82,21%
45
DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. DONGGALA
46
DINAS SOSIAL, TENAGA KERJA DAN TRANSMIGRASI KAB. MOROWALI
9.377.494.000
6.907.491.000
73,66%
47
DINAS NAKERTRANS KAB. PARIGI MOUTONG
4.701.058.000
4.450.484.800
94,67%
3.629.607.000
2.068.980.900
57,00%
2.866.928.000
2.369.340.500
82,64%
155.788.000
99.039.000
63,57%
DINAS TENAGA KERJA, TRANSMIGRASI, 48 KEPENDUDUKAN DAN CAPIL KAB. TAKALAR DINAS TENAGA KERJA DAN 49 TRANSMIGRASI PROPINSI SULAWESI SELATAN DINAS SOSIAL, TENAGA KERJA DAN 50 TRANSMIGRASI KABUPATEN WAJO
No 51 52 53 54 55 56 57 58 59 60
Satker DINAS SOSIAL, TENAGA KERJA DAN TRANSMIGRASI KAB. LUWU UTARA DINAS TENAGA KERJA, TRANSMIGRASI DAN SOSIAL KAB. LUWU TIMUR DINAS SOSIAL, TENAGA KERJA DAN TRANSMIGRASI KABUPATEN TORAJA UTARA DINAS SOSIAL, TENAGA KERJA DAN TRANSMIGRASI KAB. BUTON DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. KOLAKA DINAS TENAGA KERJA DAN TRANSMIGRASI PROVINSI SULAWESI TENGGARA DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. MUNA DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. KONAWE SELATAN DINAS TENAGA KERJA DAN TRANSMIGRASI KABUPATEN KONAWE Dinas Tenaga Kerja dan Transmigrasi Kab. Konawe Utara
Pagu Total
Realisasi Total Persentase
155.788.000
108.116.000
69,40%
155.788.000
128.335.100
82,38%
158.668.000
116.320.000
73,31%
5.377.316.000
4.277.476.350
79,55%
4.704.930.000
4.464.728.780
94,89%
4.504.312.000
2.770.257.700
61,50%
3.826.094.000
3.627.446.200
94,81%
9.770.748.000
7.442.887.250
76,18%
6.839.862.000
6.721.211.500
98,27%
7.263.043.000
7.053.002.000
97,11%
No 61
Satker DINAS SOSIAL, TENAGA KERJA DAN TRANSMIGRASI KAB. BUTON UTARA
62 DINAS NAKERTRANS PROVINSI MALUKU DINAS TENAGA KERJA DAN TRANSMIGRASI PROVINSI BALI DINAS TENAGA KERJA DAN TRANSMIGRASI 64 PROV. NUSA TENGGARA BARAT DINAS TENAGA KERJA DAN TRANSMIGRASI 65 PROV. NUSA TENGGARA TIMUR DINAS SOSIAL, TENAGA KERJA DAN 66 TRANSMIGRASI KAB. BELLU 63
67
DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. SUMBA TIMUR
68
DINAS TENAGA KERJA DAN TRANSMIGRASI KABUPATEN ROTE NDAO
69
DINAS SOSIAL, TENAGA KERJA DAN TRANSMIGRASI KAB. MANGGARAI BARAT
70
DINAS TENAGA KERJA DAN KEPENDUDUKAN PROVINSI PAPUA
Pagu Total
Realisasi Total Persentase
2.374.956.000
2.075.420.050
87,39%
426.408.000
328.027.600
76,93%
1.927.913.000
1.155.768.300
59,95%
2.620.918.000
1.719.677.908
65,61%
3.368.713.000
2.235.856.250
66,37%
4.694.960.000
4.166.392.950
88,74%
17.350.465.000
15.857.005.088
91,39%
3.945.529.000
3.729.816.900
94,53%
152.142.000
99.062.000
65,11%
1.912.943.000
443.337.000
23,18%
No 71 72 73 74 75 76 77 78 79 80
Satker 350375 | DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. MERAUKE 350377 | DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. KEEROM 350382 | DINAS TENAGA KERJA DAN TRANSMIGRASI PROVINSI BENGKULU 350383 | DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. BENGKULU UTARA 350384 | DINAS SOSIAL, TENAGA KERJA DAN TRNASMIGRASI KAB. REJANG LEBONG 350386 | DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. KAUR 350391 | DINAS TENAGA KERJA DAN TRASMIGRASI PROPINSI MALUKU UTARA 350393 | DINAS NAKERTRANS KAB. HALMAHERA TENGAH 350396 | DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. HALMAHERA TIMUR 350404 | DINAS TENAGA KERJA DAN TRANSMIGRASI PROVINSI BANTEN
Pagu Total
Realisasi Total Persentase
9.743.565.000
9.230.553.300
94,73%
8.352.800.000
3.777.071.000
45,22%
1.524.925.000
835.212.230
54,77%
3.919.583.000
3.442.707.300
87,83%
2.079.574.000
1.495.085.600
71,89%
143.472.000
121.192.000
84,47%
2.642.339.000
1.924.507.000
72,83%
6.494.440.000
348.882.000
5,37%
5.698.881.000
1.982.609.400
34,79%
2.182.338.000
1.311.780.000
60,11%
No 81 82 83 84 85 86 87 88 89 90
Satker DINAS TENAGA KERJA DAN TRANSMIGRASI PROVINSI BANGKA BELITUNG DINAS TENAGA KERJA DAN TRANSMIGRASI PROV. GORONTALO DINAS TENAGA KERJA DAN TRANSMIGRASI KABUPATEN GORONTALO DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. BOALEMO DINAS KEPENDUDUKAN, TENAGA KERJA DAN TRANSMIGRASI PROVINSI PAPUA BARAT DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. MANOKWARI DINAS TENAGA KERJA DAN TRANSMIGRASI KABUPATEN FAK-FAK DINAS TENAGA KERJA DAN TRANSMIGRASI PROVINSI SULAWESI BARAT DINAS SOSIAL TENAGA KERJA DAN TRANSMIGRASI KAB. MAMUJU DINAS SOSIAL, TENAGA KERJA DAN TRANSMIGRASI PROVINSI KALIMANTAN UTARA
Pagu Total
Realisasi Total Persentase
526.003.000
473.654.100
90,05%
2.931.266.000
2.730.783.300
93,16%
8.314.742.000
4.942.870.710
59,45%
9.027.041.000
7.786.255.900
86,25%
2.603.749.000
1.847.758.700
70,97%
4.846.164.000
1.759.074.450
36,30%
15.761.704.000
14.006.275.649
88,86%
1.978.541.000
1.613.401.520
81,55%
4.281.192.000
1.041.885.200
24,34%
3.281.256.000
1.916.011.775
58,39%
No 91 92 93 94 95 96 97 98 99 100
Satker DINAS KELUARGA SEJAHTERA, MOBDUK DAN TRANSMIGRASI KABUPATEN SIMEULEU DINAS KEPENDUDUKAN DAN PENCATATAN SIPIL, SOSNAKERTRANS KABUPATEN MOROWALI UTARA DINAS TENAGA KERJA DAN TRANSMIGRASI PROVINSI DKI JAKARTA DINAS NAKER DAN TRANS KAB. GORONTALO UTARA DINAS SOSIAL TENAGA KERJA DAN TRANSMIGRASI KAB. ACEH BARAT DAYA DINAS SOSIAL TENAGA KERJA DAN TRANSMIGRASI KAB. ACEH SINGKIL DINAS SOSIAL TENAGA KERJA DAN TRANSMIGRASI KAB. ACEH TAMIANG DINAS SOSIAL TENAGA KERJA DAN TRANSMIGRASI KAB. DHARMAS RAYA DINAS TENAGA KERJA DAN TRANSMIGRASI PROV. KEPULAUAN RIAU DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. MUSI BANYUASIN
Pagu Total
Realisasi Total Persentase
3.552.015.000
3.331.831.000
93,80%
7.884.353.000
7.608.013.000
96,50%
596.763.000
289.352.884
48,49%
4.370.665.000
2.262.509.330
51,77%
3.832.269.000
795.764.250
20,76%
4.482.877.000
2.709.196.010
60,43%
4.045.797.000
2.121.172.000
52,43%
3.637.860.000
156.353.040
4,30%
464.962.000
350.630.000
75,41%
5.826.445.000
3.971.752.381
68,17%
No 101 102 103 104 105 106 107 108 109 110
Satker DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. OGAN ILIR DINAS SOSIAL TENAGA KERJA DAN TRANSMIGRASI KAB. BENGKULU SELATAN DINAS SOSIAL TENAGA KERJA DAN TRANSMIGRASI KAB. SANGGAU DINAS SOSIAL TENAGA KERJA DAN TRANSMIGRASI KAB. BENGKAYANG DINAS SOSIAL TENAGA KERJA DAN TRANSMIGRASI KAB. SINTANG DINAS SOSIAL TENAGA KERJA DAN TRANSMIGRASI KAB. TANAH BUMBU DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. KUTAI TIMUR DINAS TENAGA KERJA PERINDAGKOP DAN TRANSMIGRASI KAB. TANA TIDUNG DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. BOLAANG MONGONDOW TIMUR DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. POHUWATO
Pagu Total
Realisasi Total Persentase
3.758.146.000
3.304.045.200
87,92%
5.190.190.000
245.460.000
4,73%
9.567.565.000
3.887.100.050
40,63%
11.667.330.000
274.150.000
2,35%
4.805.754.000
2.957.452.500
61,54%
7.109.831.000
1.573.846.210
22,14%
4.193.542.000
3.901.926.000
93,05%
2.296.236.000
1.999.498.773
87,08%
4.278.621.000
3.435.113.917
80,29%
10.074.573.000
9.467.689.500
93,98%
No 111 112 113 114 115 116 117 118 119 120
Satker DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. TOJO UNA-UNA DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. MUNA BARAT DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. KOLAKA TIMUR DINAS SOSIAL TENAGA KERJA DAN TRANSMIGRASI KAB. POLEWALI MANDAR DINAS SOSIAL TENAGA KERJA DAN TRANSMIGRASI KAB. MAMASA DINAS TENAGA KERJA TRANSMIGRASI DAN SOSIAL KAB. PULAU MOROTAI DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. KEPULAUAN SULA DINAS TENAGA KERJA DAN TRANSMIGRASI KAB. MALUKU TENGAH DINAS SOSIAL TENAGA KERJA DAN TRANSMIGRASI KAB. MANOKWARI SELATAN DINAS TENAGA KERJA TRANSMIGRASI DAN PERUMAHAN RAKYAT KAB. MAYBRAT
Pagu Total
Realisasi Total Persentase
403.782.000
310.250.500
76,84%
7.096.664.000
354.594.300
5,00%
6.521.403.000
5.473.551.620
83,93%
6.774.898.000
4.963.033.899
73,26%
8.693.752.000
8.421.162.000
96,86%
273.190.000
245.178.000
89,75%
7.209.601.000
4.935.824.581
68,46%
295.060.000
23.100.000
7,83%
6.020.780.000
5.080.056.800
84,38%
7.021.251.000
6.509.288.001
92,71%
LAMPIRAN 2 Program PKP2Trans Tahun 2017
35
Program PKP2Trans Tahun 2017 NTB
NTT
JUMLAH
6
16
17
18
19
20
21
22
23
24
25
26
27
25
25
-
25
25
-
-
-
-
-
-
-
-
-
-
-
25
25
-
25
25
-
25
25
-
-
-
-
-
-
-
-
-
-
-
25
110
-
110
60
50
110
60
5
-
15
-
10
10
10
-
-
-
50
110
60
-
60
30
30
60
30
5
-
5
-
10
-
10
-
-
-
30
60
50
-
50
30
20
50
30
-
-
10
-
-
10
-
-
-
-
20
50
275
-
275
275
-
275
275
-
-
-
-
-
-
-
-
-
-
-
275
150
-
150
150
-
150
150
-
-
-
-
-
-
-
-
-
-
-
150
Sanggau 5 Sungai Beruang (SP
50
-
50
50
-
50
50
-
-
-
-
-
-
-
-
-
-
-
50
Sintang 6 Serawai
75
-
75
75
-
75
75
-
-
-
-
-
-
-
-
-
-
-
75
100
-
100
-
100
100
-
-
-
-
-
100
-
-
-
-
-
100
100
100
-
100
-
100
100
-
-
-
-
-
100
-
-
-
-
-
100
100
75
-
75
35
40
75
35
-
10
10
5
5
10
-
-
-
-
40
75
50
-
50
25
25
50
25
-
-
10
-
5
10
-
-
-
-
25
50
25
-
25
10
15
25
10
-
10
-
5
-
-
-
-
-
-
15
25
25
-
25
15
10
25
15
-
-
-
-
-
-
10
-
-
-
10
25
25
-
25
15
10
25
15
-
-
-
-
-
-
10
-
-
-
10
25
Lahat 3 Keban Agung
KALIMANTAN UTARA 7 Bulungan 7 Sepunggur GORONTALO 8 Gorontalo 8 Bukit Aren 9
15
BALI
5
14
JATIM
4
13
DIY
6
12
-
KALIMANTAN BARAT 4 Bengkayang 4 Semunying/ Sahan 5
11
JATENG
3
10
TOTAL
25
SUMATERA SELATAN 2 Banyuasin 2 Sri Agung 3
9
JML
DKI
2
SUMATERA BARAT 1 Dharmasraya 1 Padang Hilalang SP.2
JML
TPA
JABAR
1
C
TPS TPS
BANTEN
2
1
M
KOMPOSISI PENEMPATAN TRANSMIGRASI (KK) TPA
PENEMPATAN TRANSMIGRASI (KK)
LAMPUNG
PROVINSI/ KABUPATEN /LOKASI
NO
PEMBANGUNAN PERMUKIMAN (UNIT) TOTAL
Gorontalo Utara 9 Motihelumo (Tunda 2016)
SULAWESI SELATAN 10 Sidrap 10 Wala/ Lagading
16
17
18
19
JUMLAH
15
NTT
14
NTB
13
BALI
12
JATIM
11
DIY
10
JATENG
9
9
20
21
22
23
24
25
26
TOTAL
27
100
-
100
45
55
100
45
-
-
10
-
-
15
10
15
5
-
55
100
50
-
50
20
30
50
20
-
-
-
-
-
10
-
15
5
-
30
50
50
-
50
25
25
50
25
-
-
10
-
-
5
10
-
-
-
25
50
150
-
150
85
65
150
85
-
-
20
5
15
5
15
-
5
-
65
150
50
-
50
25
25
50
25
-
-
10
-
-
-
15
-
-
-
25
50
13 Kolaka Timur 13 Tongauna
50
-
50
30
20
50
30
-
-
5
5
5
-
-
-
5
-
20
50
14 Konawe 14 Parudongka
50
-
50
30
20
50
30
-
-
5
-
10
5
-
-
-
-
20
50
75
-
75
40
35
75
40
-
-
-
-
-
-
15
20
-
-
35
75
50
-
50
25
25
50
25
-
-
-
-
-
-
5
20
-
-
25
50
25
-
25
15
10
25
15
-
-
-
-
-
-
10
-
-
-
10
25
100
-
100
100
-
100
100
-
-
-
-
-
-
-
-
-
-
-
100
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
50
-
50
50
-
50
50
-
-
-
-
-
-
-
-
-
-
-
50
12 Morowali 12 Kaibera 8
JML
JML
DKI
SULAWESI TENGAH 11 Tojo Una Una 11 Uetangko/ Uematopa SP.1
C
TPA
JABAR
7
2
M
TPS TPS
BANTEN
1
PROVINSI/ KABUPATEN /LOKASI
KOMPOSISI PENEMPATAN TRANSMIGRASI (KK) TPA
PENEMPATAN TRANSMIGRASI (KK)
LAMPUNG
NO
PEMBANGUNAN PERMUKIMAN (UNIT) TOTAL
SULAWESI TENGGARA 12 Muna Barat Lakabu dan 12 Momunt u
SULAWESI BARAT 15 Mamasa 15 Rano 16 Polewali Mandar 16 Piriantapiko
10 NUSA TENGGARA TIMUR 17 Sumba Timur 17 Kotakawaw 18 Nagekeo 18 Ikiseo Gezu
15
16
17
18
19
JUMLAH
14
NTT
13
NTB
JUMLAH TOTAL
12
BALI
24 Manokwari 24 Meyes
11
JATIM
13 PAPUA BARAT 23 Manokwari Selatan 23 Desa Dembek
10
DIY
22 Merauke 22 Muting SP.XII
9
JATENG
12 PAPUA 21 Keerom 21 Senggi SP.2
JML
JML
DKI
11 MALUKU UTARA 20 Kepulauan Sula 20 Modapuhi
C
TPA
JABAR
2
M
TPS TPS
BANTEN
1
PROVINSI/ KABUPATEN /LOKASI
KOMPOSISI PENEMPATAN TRANSMIGRASI (KK) TPA
PENEMPATAN TRANSMIGRASI (KK)
LAMPUNG
NO
PEMBANGUNAN PERMUKIMAN (UNIT) TOTAL
20
21
22
23
24
25
26
TOTAL
27
35
-
35
20
15
35
20
5
-
-
-
-
-
10
-
-
-
15
35
35
-
35
20
15
35
20
5
-
-
-
-
-
10
-
-
-
15
35
100
-
100
100
-
100
100
-
-
-
-
-
-
-
-
-
-
-
100
50
-
50
50
-
50
50
-
-
-
-
-
-
-
-
-
-
-
50
50
-
50
50
-
50
50
-
-
-
-
-
-
-
-
-
-
-
50
100
-
100
100
-
100
100
-
-
-
-
-
-
-
-
-
-
-
100
50
-
50
50
-
50
50
-
-
-
-
-
-
-
-
-
-
-
50
50
-
50
50
-
50
50
-
-
-
-
-
-
-
-
-
-
-
50
1.270
-
1.270
900
370
1.270
900
10
10
55
10
130
40
70
35
10
-
370
1.270