USAID INDONESIA URBAN WATER SANITATION AND HYGIENE
QUARTERLY PROGRESS REPORT 17 APRIL - JUNE 2015
PMP ANNEX
AUGUST 2015 This report is made possible by the support of the American People through the United States Agency for International Development (USAID). The contents of this report are the sole responsibility of DAI and do not necessarily reflect the views of USAID or the United States Government.
Mission Director of USAID Indonesia, Andrew Sisson, accompanied by representatives of Bandung District local government conducted a field visit to Panyocokan village on June 9, 2015 to meet with beneficiaries of a microfinance for sanitation program initiated under IUWASH. A collaborative effort between the local government of Bandung District and PT. Bank Perkreditan Rakyat (BPR) Kerta Raharja, the program was made possible through a local government investment of IDR 5 billion. Part of a broader and concerted effort by IUWASH to increase access to improved sanitation facilities, the program has involved (in addition to microfinance) the establishment of new local regulations and institutions related to sanitation, the training of local sanitation contractors, as well as the development of a robust program of promotion (and which involves Ministry of Helth, BPR and the women's empowerment association or PKK. Photo credit: Pryatin M. Santoso/IUWASH Jakarta
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE
QUARTERLY PROGRESS REPORT 17 APRIL – JUNE 2015
PMP ANNEX
Program Title:
USAID Indonesia Urban Water Sanitation and Hygiene
Sponsoring USAID Office: USAID/Indonesia Office of Environment Contract Number:
AID-497-C-11-00001
Contractor:
DAI
Date of Publication:
August 2015
Author:
DAI
This report is made possible by the support of the American People through the United States Agency for International Development (USAID). The contents of this report are the sole responsibility of DAI and do not necessarily reflect the views of USAID or the United States Government.
TABLE OF CONTENTS PROJECT MONITORING & EVALUATION .......................................................................................... 1 SUMMARY OF ACHIEVEMENT OF PMP OUTCOMES BY PROVINCE, STATUS MARCH 2015............................. 3 ACHIEVEMENT OF IUWASH PMP OUTCOME OF HIGH LEVEL RESULTS, STATUS OF JUNE 2015 ..................................................................................................................... 15 ACHIEVEMENT OF IUWASH PMP OUTCOME OF COMPONENT 1 (MD): DEMAND MOBILIZATION FOR IMPROVED WATER AND SANITATION SERVICES, STATUS OF JUNE 2015 ..................................................................................................................... 17 ACHIEVEMENT OF IUWASH PMP OUTCOME OF COMPONENT I1 (IC): CAPACITY IMPROVEMENTS TO PROVIDE SUSTAINABLE SAFE WATER AND SANITATION SERVICE, STATUS OF JUNE 2015 ......................................................................... 18 ACHIEVEMENT OF IUWASH PMP OUTCOME OF COMPONENT I1I (EE): CREATE ENABLING ENVIRONMENT SUPPORTING EQUITABLE WATER AND SANITATION SERVICES, STATUS OF JUNE 2015 ....................................................................... 19 TRAINING, WORKSHOP AND SEMINAR ACTIVITIES OF THIRD QUARTER OF FIFTH YEAR (PERIOD OF APRIL – JUNE 2015) ...................................................................... 34 STATUS OF IUWASH POLICY DEVELOPMENT SUPPORTED WATSAN SECTOR STATUS: JUNE 2015 .......................................................................................................................... 66
ii
Section 1
PROJECT MONITORING & EVALUATION The following presents detailed information on quarterly and cumulative progress under IUWASH targeted outcomes as defined with the project’s Performance Monitoring Plan (PMP). This report covers the third quarter of the “program year” (PY5) for IUWASH, and as such, it provides up-todate information on most, but not all, progress under targeted outcomes. Those which are not reported on are those which depend on consolidating data from multiple sources which themselves are not regularly or easily updated (such as PDAM connection data from all fifty (50) partner PDAMs, or the annual sector budget allocations from each partner LG). As opposed to quarterly, these are reported on semi-annually and will be updated and reported on next quarter. The Table below provides a comprehensive data on IUWASH progress to date. Quantitative achievements for the quarter are provided in the “Q3” column of the PY5 achievement section. A note provided at the bottom of the Table serves additional information for specific outcome that need more explanation. In addition to achievements registered this quarter and previous quarters of PY5, the table also shows quantitative achievements registered in PY1, PY2, PY3, and PY4. The table concludes with a column showing the total achievement to date, including the percentage of the project’s total target. Progress against targeted outcomes this quarter is presented under the following headings: • High Level Results/MDG Outcomes (HR) • Component 1: Mobilize Demand for Improved Water and Sanitation Services (MD) • Component 2: Improve Capacity to Provide Sustainable Safe Water and Sanitation Services (IC) • Component 3: Create an Enabling Environment Supporting Equitable Water and Sanitation Services (EE) This quarter, it can be noted that one additional outcome surpassed the life of project target (Outcome HR-4). This brings the total number of outcomes that have surpassed the life of project target to seven (7). The outcomes are: 1. Outcome HR-3 (decreasing of water cost by the poor); 2. Outcome HR-4 (people participate in IUWASH related training activities); 3. Outcome MD-2 (Government institutions and/or CSO implementing watsan program 4. Outcome IC-3 (PDAM improved credit worthiness) 5. Outcome IC-7 (satisfaction of the poor to watsan services) 6. Outcome EE-3 (percent increased of amount leveraged to support the improvement of watsan sector 7. Outcome EE-4 (households accessing microfinance for improvement of watsan services) While the value of the IUWASH PMP and monitoring system is an important requirement under the project, it is used to much effect in overall program planning, budgeting and coordination. Specifically, and based on perceived progress (or lack thereof) under certain outcomes, IUWASH adjusts the focus of its work to those deemed as “critical”. During the current period, IUWASH is tracking closely six (6) outcomes that are deemed as “critical outcomes”. In the remaining time of the project, IUWASH will give priority to these outcomes with frequent updates and by the M&E Team to ensure that appropriate adjustments in programming are made to maximize progress in these areas. The six critical outcomes are: • Outcome HR-2 (people increase access to improved sanitation facility) and Outcome MD-1 (Households have willingness to pay for sanitation improvements). Even though the achievement of this outcome is significant for the last six months, IUWASH team still needs to continue to
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
• •
•
•
give priority to all works that contributed to the achievement of this outcome. The reason for this is that IUWASH depends of the collaboration with other key stakeholders to register progress in these areas and that, as seen in the table, substantial progress was made only more recently as several contributing program activities gained significant traction. Outcome MD-3 (Civil society groups that report on PDAM operations or performance). The completion of this outcome requires series of efforts to complete all stages determined including the supporting official documents needed to prove the quality of the stages achieved. Outcome IC-4 (LG implementing CC-VAAP to support the improvement of raw water sources). Similar to Outcome HR-2, this quarter, there is much progress but requires more work. Also, progress under this outcome impacts progress under another outcome (Outcome IC-10, capacity building for LGs partner on impact of climate change). Outcome IC-8 (Development of sanitation management unit). As opposed to simply establishing sanitation management units through local regulation, IUWASH has set the bar higher and seeks to put into place not only relevant regulations, but also ensure that new or revitalized units: are appropriately staffed; are supported by local budget allocations; have relevant five-year plans; have clear staffing and capacity building targets, and are beginning to actually function and provide services. As such, the completion of this outcome requires a series of efforts and many formal LG supporting documents. So far only one city (Kota Jayapura) has completed all the stages of the sanitation unit development process. Outcome EE-5 (Development of Citizen Engagement Mechanism/CEM). The process to formally register achievements under this outcome is similar with Outcome IC-8 in that there are multiple stages and supporting documents to collect.
Based on IUWASH PMP – Third Revision, the outcomes reported on this quarter are as follow: • Outcome HR-3: Refer to the new definition of this outcome in the current IUWASH PMP, this quarter IUWASH conducted water cost survey in Kab. Sidoarjo. This survey was to get additional data to meet the requirements stated in the current PMP. The result of the survey is presented in the summary table below. • Outcome HR-4: Number of people that participated in IUWASH training activities. This quarter, IUWASH surpassed the life of project target. • Outcome MD-2: IUWASH surpassed the life of project target last quarter and the achievement of this outcome this quarter continued to contribute the high achievement of this outcome. • Outcome IC-6: The achievement of this outcome this quarter brings to a significant step for IUWASH to almost reach the life of the project target. • Outcome EE-1: As this is the combination of two fairly important and detached indicators (local policies and local budgets), IUWASH only reports the progress on “half” of the outcome (policy development) this quarter. Progress on LG budget (APBD) allocations will be reported on next quarter. It is not reported on earlier in the year due to both the difficulty of obtaining LG budget data from the project’s 54 partner LGs and, notably, the cumbersome process of determining and rechecking allocation to the water supply and sanitation sectors (as these are spread out over several budget line items). IUWASH will present the final achievement of this year for both indicators in the next quarter. • Outcome EE-3 and EE-4: IUWASH surpassed the life of project target last quarter and the achievement of this outcome this quarter continued to be substantial.. See table below for more detailed information on the outcome above.
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
2
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
SUMMARY OF ACHIEVEMENT OF PMP OUTCOMES BY PROVINCE, STATUS MARCH 2015 Note: The rows with yellow color indicate the IUWASH results and outcomes that contribute to the Operational Plan (OP) Performance indicators. Target Over the life of Project High Level Result (HR) PMP Outcome Indicator
HR.1. Number of people in urban areas gain access to improved water supply as a result of US Government assistance HR.2 Number of people in urban areas gain access to improved sanitation facilities as a result of US Government assistance
2,000,000
Achievement PY1
0
PY2
251,630
PY3
595,885
PY5 Achievement PY4
622,665
Achievements Thru PY4
Region
Q1
Q2
Q3
NS
N/A
29,645
N/A
WJDB
N/A
106,305
N/A
CJ
N/A
65,380
N/A
EJ
N/A
190,065
N/A
SSEI
N/A
36,465
N/A
0
427,860
0
NS
N/A
2,810
N/A
WJDB
N/A
5,220
N/A
CJ
N/A
62,935
N/A
EJ
N/A
17,970
N/A
SSEI
N/A
505
N/A
0
89,440
0
1,470,180 (73.5%)
Total Achievement of HR-1
250,000
0
13,615
42,610
40,425
Q4
Total up to this Quarter
96,650 (38.66%)
Total Achievement of HR-2
427,860
89,440
Total Achievements as % of total target
1,898,040 (94.9%)
186,090 (74.44%)
*) This outcome is reported semi-annually. IUWASH will report next quarter in September 2015
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
3
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Target Over the life of Project High Level Result (HR) HR.3 The per unit water cost paid by the poor in targeted communities decreases by at least 20% 20 through more participatory, transparent, accountable and financially enabled services PMP Outcome Indicator
HR.4 Number of people trained in IUWASH training type of activities
75,000
Achievement PY1
0
PY2
n.a (*)
PY3
n.a (*)
PY5 Achievement PY4
Achievements Thru PY4
n.a (*)
n.a (*)
(0%)
Region
Q1
Q2 (**)
Q3 (***)
NS
N/A
89%
N/A
WJDB
N/A
(6%)
N/A
CJ
N/A
58%
N/A
EJ
N/A
N/A
32
SSEI
N/A
N/A
N/A
0
47%
32%
NS
1,737
1,022
339
WJDB
1,671
2,715
2,857
CJ
1,975
1,513
4,027
EJ
1.734
1,093
1,871
SSEI
2,088
1,900
3,109
9,205
8,243
12,203
Total Achievement of HR-3
417
14,834
22,078
15,177
52,506 (70.01%)
Total Achievement of HR-4
Q4
Total up to this Quarter
43% (**)
29,651
Total Achievements as % of total target
43% (**) (217%)
82,157 (109.54%)
(*)Based on the project’s new PMP (Third Revision), this outcome is only measured at IUWASH Master Meter locations. As such, previous measurements are no longer valid and will be adjusted following completion of a new water cost survey. (**)This figure is the result of the new water cost survey that was implemented in Kab. Tangerang, Kota Sibolga, Kota Surakarta and Kab. Sidoarjo. (***)This figure is the result of the new water cost survey implemented in Kab. Sidoarjo. IUWASH will update this figure every time IUWASH has results of water cost survey from another IUWASH site.
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
4
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Achievement Target Over the Achievements Thru PY4 life of PY1 PY2 PY3 PY4 Project Component 1: Mobilize Demand for Improved Water and Sanitation Services (MD) MD.1 Number of 19,330 households 50,000 0 2,113 7,233 9,984 willing to pay (38.66%) for sanitation improvements PMP Outcome Indicator
PY5 Achievement Region
Q1
Q2
Q3
NS
N/A
562
N/A
N/A N/A N/A N/A 0
1,044 12,587 3,594 101 17,888
N/A N/A N/A N/A 0
NS
0
0
0
WJDB
0
0
0
CJ
0
8
0
WJDB CJ EJ SSEI Total Achievement of MD-1
MD.2 Number of Government institutions and/or civil society groups implementing programs to mobilize improved access to safe drinking water and adequate sanitation
100
MD.3. Number of civil society groups that report on PDAM operations or performance
20
0
0
6
0
36
0
40
82 (82%)
EJ
0
143
0
SSEI
0
0
6
0 0 0 0 0
151 0 0 0 0
6 0 0 0 0
0
0
0
0
0
0
Total Achievement of MD-2 NS WJDB CJ 0 0 EJ (0%) SSEI Total Achievement of MD-3
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
Q4
Total up to this Quarter
17,888
157
0
Total Achievements as % of total target
37,218 (74.44%)
239 (239%)
0 (0%)
5
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Target Achievement Over the Achievements Thru PY4 life of PY1 PY2 PY3 PY4 Project Component 1: Mobilize Demand for Improved Water and Sanitation Services (MD) PMP Outcome Indicator
MD.4. Percent increase in households adopting hygienic behavior related to improved sanitation services
20
MD.5. Number of master trainers exposed to participatory planning activities
100
N/A
N/A
N/A
27.25% (*)
27.25% (*)
PY5 Achievement Region
Q1
Q2
Q3
NS
N/A
N/A
N/A
WJDB CJ EJ
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
SSEI
N/A
N/A
N/A
Total Achievement of MD-4 NS WJDB CJ 0 0 EJ SSEI Total Achievement of MD-5
N/A
N/A
N/A
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0
0
0
0
0
0
Q4
Total up to this Quarter
Total Achievements as % of total target
0
27.25%
0
0%
(*) The figures on percent increased were the results of data analysis of Survey #1 and survey #2. These figures are the comparison between results of survey #1 and survey #2. Based on recent revised PMP, IUWASH needs to conduct new survey to meet the criteria stated in the PMP. This quarter IUWASH prepared all required tools and conduct the new survey the following quarter.
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
6
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Target Achievement Over the Achievements Thru PY4 life of PY1 PY2 PY3 PY4 Region Project Component 2: Improve Capacity to Provide Sustainable Safe Water and Sanitation Services (IC) IC.1. NS Number of WJDB PDAMs with 44 44 (cumulative) improved CJ 50 0 4 30 technical, (cumulative) EJ (88%) financial and management SSEI performance PMP Outcome Indicator
IC.2. Number of PDAMs in default of old debts are assisted in restructuring their outstanding debts IC.3. Number of PDAMs with improved credit worthiness
20
0
2*
8
Total Achievement of IC-1 NS WJDB CJ 10 EJ 0
0
0
2
Q1
Q2
Q3
N/A
9
N/A
N/A N/A N/A
7 10 9
N/A N/A N/A
N/A
10
N/A
0 N/A N/A N/A N/A
45
0 0 0 0
0 N/A N/A N/A N/A
N/A
0
N/A
0 N/A N/A N/A N/A
0 (**) 0 0 0 0 0
0 N/A N/A N/A N/A
(50%)
SSEI
20
PY5 Achievement
Total Achievement of IC-2 NS WJDB 28 CJ 26 EJ (140%) SSEI
N/A
N/A
Q4
Total up to this Quarter
45
(cumulative)
Total Achievements as % of total target
45
(cumulative)
(90%)
0
0
10 (50%)
28 (140%)
0 0 Total Achievement of IC-3 0 *) Total number of debts restructuring plans submitted to MoF was adjusted for PY3 because IUWASH support for Kota Medan was limited and focused on monitoring. The debt restructuring plan for Langkat was prepared with IUWASH assistance, but until now has not been approved by the LG and, as such, cannot be submitted to MoF. **) IUWASH is supporting MoF with monitoring progress of the implementation of debt restructuring according to previously approved plans; results will be included in the PY5 September Report.
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
7
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Target Achievement Over the Achievements Thru PY4 life of PY1 PY2 PY3 PY4 Region Project Component 2: Improve Capacity to Provide Sustainable Safe Water and Sanitation Services (IC) IC.4. NS Number of WJDB local government CJ institutions EJ implementing 0 necessary climate change 20 0 0 0 0 adaptation (0%) measures, SSEI based on preliminary raw water vulnerability assessments PMP Outcome Indicator
IC.5.
Number of local governments implementing integrated sanitation and hygiene interventions that reflect their citywide sanitation strategic plans
30
0
0
0
Total Achievement of IC-4 NS WJDB CJ EJ 0 0 (0%) SSEI
Total Achievement of IC-5
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
PY5 Achievement Q1
Q2
Q3
N/A
1
N/A
N/A N/A N/A
0 2 1
N/A N/A N/A
Q4
Total up to this Quarter
4 N/A
0
N/A
0 N/A N/A N/A N/A
4
0 N/A N/A N/A N/A
0 0
0 0
0 N/A
0
N/A
0
0
0
Total Achievements as % of total target
4 (20%)
0 (0%)
8
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Target Achievement Over the Achievements Thru PY4 life of PY1 PY2 PY3 PY4 Region Project Component 2: Improve Capacity to Provide Sustainable Safe Water and Sanitation Services (IC) PMP Outcome Indicator
IC.6. Number of small and medium business providing affordable construction and sanitation facility management services IC.7. Increased percentage (%) of poor residents in targeted communities who report greater satisfaction with water and sanitation services
30
0
0
4
6
10
Q1
Q2
Q3
NS
0
0
0
WJDB CJ EJ
3 0 1
1 0 0
0 9 0
(33.33%)
Total Achievement of IC-6 NS WJDB CJ EJ 0
0
0
0
Q4
Total up to this Quarter
19 SSEI
20
PY5 Achievement
1
2
2
5 N/A N/A N/A N/A
3 76.80% 100% 79.17% 89.72%
N/A N/A N/A N/A
81.34% (*)
(0%) N/A
61%
29 (96,67%)
11
0%
SSEI
Total Achievements as % of total target
N/A
81.34% (406.69%)
81.34% 0 (*) (*) This outcome is reported based on a survey conducted as part of water cost and improved hygiene behavior survey. This quarter, IUWASH conducted water cost survey in KabKota Sibolga, Kab. Tangerang and Kota Surakarta that also included survey on satisfaction of the poor.
Total Achievement of IC-7
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
0
9
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Target Achievement Over the Achievements Thru PY4 life of PY1 PY2 PY3 PY4 Region Project Component 2: Improve Capacity to Provide Sustainable Safe Water and Sanitation Services (IC) PMP Outcome Indicator
IC.8. Number of municipal sanitation management units established with supporting policies, budgets and personnel
IC.9. Number of “Sustainable Urban Sanitation Framework” adopted by the GOI as a key part of national sanitation programming policy IC.10. Number of people from stakeholders institutions increased capacity to adapt to the impacts of climate variability and change as a result of USG assistance
10
1
N/A
N/A
N/A
N/A
N/A
N/A
0
0 (0%)
Q1
Q2
Q3
NS
N/A
0
N/A
WJDB CJ EJ
N/A N/A N/A
0 0 0
N/A N/A N/A
SSEI
N/A
1
N/A
0 N/A N/A N/A N/A
1
N/A N/A N/A N/A
0 N/A N/A N/A N/A
Total Achievement of IC-8 NS WJDB CJ EJ 0
0
N/A
N/A
N/A
(0%)
Total Achievement of IC-9 NS WJDB CJ 0 EJ 0 (0%) SSEI Total Achievement of IC-10
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
Q4
Total up to this Quarter
1
0 SSEI
100
PY5 Achievement
N/A
N/A
N/A
0 0
0 0
0 0
0
0
0
0
0
0
0
0
0
0 0
0
0
0
0
0
Total Achievements as % of total target
1 (10%)
0 (0%)
0 (0%)
10
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Target Achievement Over the Achievements Thru PY4 life of PY1 PY2 PY3 PY4 Region Project Component 3: Create an Enabling Environment Supporting Equitable Water and Sanitation Services (EE) PMP Outcome Indicator
EE.1-a (Policy development)
NS 50
EE.1-b (LG Sector Budget Allocations Increased)
50 (Cumulative)
0
0
5
3
6
4
49
WJDB CJ (98%) EJ SSEI Total Achievement of EE-1-a NS WJDB 50 CJ 50 EJ (100%) 38
SSEI EE.1 Number of participating Local Governments that put greater priority on safe drinking water and sanitation through supportive local policies and budget allocation increases
50 (Cumulative)
0
3
4
Total Achievement of EE-1-b NS WJDB CJ EJ 35 28 (**) (70%) SSEI
Total Achievement of EE-1
PY5 Achievement Q1
Q2
Q3
5
4
0
1
1
10 N/A N/A N/A N/A
3 1 4 0 12 N/A N/A N/A N/A
N/A N/A N/A N/A
N/A
N/A
N/A
0 N/A N/A N/A N/A
0 N/A N/A N/A N/A
0 N/A N/A N/A N/A
2 1 1
0 3 0 4
Q4
Total up to this Quarter
26
0 (*)
0 (*) N/A
N/A
N/A
0
0
0
Total Achievements as % of total target
75 (150%)
50 (100%)
35 (70%)
*) This quarter IUWASH was not able to report this outcome because many LGs have not yet published their LG budget (APBD). IUWASH will to report on progress next quarter. **) These figures indicate the achievements made by all sub-indicators of EE-1 (policy development and budget increase). Since the definition of EE-1 defines that the achievement will be made if both sub indicators have been completed. Based upon this, the figure has (**) mark indicates the final results will be provided after (as above) information on LG budget allocations is also made available.
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
11
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Target Achievement Over the Achievements Thru PY4 life of PY1 PY2 PY3 PY4 Region Project Component 3: Create an Enabling Environment Supporting Equitable Water and Sanitation Services (EE) PMP Outcome Indicator
EE.2 Number of PDAMs or local government obtain access to long-term funding for water or sanitation investment plans
EE.3 Increased percentage (%) in financial resources accessed by service providers from public and private sources for expansion of improved water and sanitation services
15
0
0
0
3
3
Q1
Q2
Q3
NS
N/A
3
N/A
WJDB CJ EJ
N/A N/A N/A
1 0 0
N/A N/A N/A
(20%)
Total Achievement of EE-2 NS WJDB CJ EJ 0
3.45%
3.7%
0.75%
Q4
Total up to this Quarter
4 SSEI
10
PY5 Achievement
N/A
0
0
N/A
4
0
3,101.12
8,640
3.796,772.72
116,700.01
3,109.090.91
67,878.00
50,754.64
581,721.41
267,640.32
961,58.09
74,547.41
3665.45
7.9% 3,87%
(79%) SSEI
Total Achievement of EE-3
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
2,675,972
6,811,928.90
33,119.09
39,700.01
299,832.95
3,813,700.04
Total Achievemen ts as % of total target
7 (46.67%)
11.77% (117,7%)
12
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Target Achievement Over the Achievements Thru PY4 life of PY1 PY2 PY3 PY4 Region Project Component 3: Create an Enabling Environment Supporting Equitable Water and Sanitation Services (EE) PMP Outcome Indicator
EE.4. Number of low income households accessing micro finance for household improvements in water and sanitation
15,000 (*)
EE.5. Number of Local Governments adopt new or improved mechanisms for citizens to engage local government in water and sanitation
20
EE.6. Number of new or improved regulation to facilitate access to capital financing in the water sector
1
0
0
983
0
4,373
0
6,870
12,226 (81.51%)
Q1
Q2
Q3
NS
28
30
66
WJDB CJ EJ
145 933 169
790 792 775
0 129 580
SSEI
563
294
376
1,838 N/A N/A N/A N/A
2,681
1,151
0 0 0 0
N/A N/A N/A N/A
N/A
0
N/A
0 N/A 0 N/A N/A
0 N/A 0 N/A N/A
0 N/A 0 N/A N/A
N/A
N/A
N/A
0
0
0
Total Achievement of EE-4 NS WJDB CJ 3 3 EJ (15%) SSEI
N/A
N/A
N/A
Total Achievement of EE-5 NS WJDB CJ N/A N/A EJ SSEI Total Achievement of EE-6
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
PY5 Achievement Q4
Total up to this Quarter
5,670
0
0
Total Achievements as % of total target
17,896 (119.31%)
3 (15%)
0 (0%)
13
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Target Achievement Over the Achievements Thru PY4 life of PY1 PY2 PY3 PY4 Region Project Component 3: Create an Enabling Environment Supporting Equitable Water and Sanitation Services (EE) PMP Outcome Indicator
EE.7. Number of central government officials exposed to alternative financing options in the water sector in the US or other applicable context
12
N/A
N/A
N/A
N/A
Q1
Q2
Q3
NS
N/A
N/A
N/A
WJDB CJ EJ
0 N/A N/A
0 N/A N/A
0 N/A N/A
Q4
Total up to this Quarter
0 0
(0%) SSEI
Total Achievement of EE-7
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
PY5 Achievement
N/A
N/A
N/A
0
0
0
Total Achievements as % of total target
0 (0%)
14
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Section 2
ACHIEVEMENT OF IUWASH PMP OUTCOME OF HIGH LEVEL RESULTS, STATUS OF JUNE 2015 1. Summary of Decreasing of Water Cost by the Poor (HR-3) Water Cost Survey Province/
Master Meter Location
City
Number of Time
Water Cost (Rp/m3) Indicator (*)
Respondent
Gang Kelinci, Pelita dan Banteng of
Sumatra/
Kelurahan Simaremare, Kec. Sibolga Utara (3
After Having
PDAM Connection PDAM Connection
(HH) North
Before Having
Decreasing of Water
Remark
Cost
Clean Water
19.202
1.936
-89,9%
The Master Meter system has been operated in August
Drinking Water
26.769
3.084
-88,5%
2014.
Kota Sibolga systems)
Total
45.971
5.020
-89,1%
WJDB/ Kab Peumahan Permata Rajeg, Kel Sukamanah, Tangerang Kec. Rajeg
Clean Water
4.987
3.731
-25%
109.144
116.779
Perumahan Griya Berkah Insani, Kel.
Feb-15
144
The Master Meter system in Griya Permata Rajeg have been operated in 2013 and in Griya Berkah Insani have
Des-14
234
Drinking Water
7%
been operated in April 2014.
Mekarsari, Kec. Rajeg Total Central Java/ Kota Surakarta East Java/ Kab Sidoarjo
RT 1, 3, 5, RW 23, Kelurahan Semanggi, Kec. Pasar Kliwon Pecantingan, Karang Gayam, Celep, Lemah Putro neighborhoods (**)
Feb-15
Jul-15
98
392
114131
120510
6%
Clean Water
5881
3772
-36%
Drinking Water
24449
8873
-64%
Total
30330
12645
-58%
Clean Water
1885
3911
107%
The Master Meter system has been operated in November
Drinking Water
97612
64203
-34%
2013.
Total
99497
68114
-32%
Average of water cost decreased based on survey conducted in PY5
The Master Meter system has been operated in May 2014.
-43%
Total Target of percent decreased of water cost by the poor over the life of the project
-20%
Percent To-date Achievement of water cost by the poor
217%
Note: (*) Clean Water defines as the water use for bathing, cleaning, cooking and drinking, while the drinking water is a specific water for drinking water to add to clean water they use for drinking and cooking. Usually it is mineral water or refill water (**) The survey conducted in these areas was the second survey due to changing definition of the method on counting the outcomes from average cost per month to cost per m3
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
15
2. Summary of People Trained in IUWASH Training Activities (HR-4) Total Average Total Budget
Total People Trained based on Type of Training Quarter
Region
Course
North Sumatra
323
33
457
918
0
0
6
0
1737
West Java/DKI Jakarta/Banten
124
0
961
446
0
0
40
0
1571
0
0
5
95
0
0
0
0
100
229
0
885
823
0
0
12
26
1975
271
0
261
1102
0
0
100
0
1734
137
233
297
0
0
71
299
2088
170
2802
3681
0
0
229
325
9205
0
647
336
0
0
23
0
1022
0
1204
646
0
128
76
0
2548
0
0
5
162
0
0
0
0
167
Central Java
359
71
705
260
76
0
0
42
1513
East Java
286
0
467
340
0
0
0
0
1093
South Sulawesi/ Eastern Indonesia
870
84
230
439
0
0
277
1900
2025
155
3258
2183
76
128
99
319
8243
0
60
248
31
0
0
0
0
339
158
47
1161
894
49
0
0
468
2777
National
North Sumatra West Java/DKI Jakarta/Banten
0
0
0
80
0
0
0
0
80
Central Java
1857
39
893
805
0
0
61
372
4027
East Java
420
25
892
507
0
0
27
0
1871
National
South Sulawesi/ Eastern Indonesia Total
1051 1998 16
Total
Jun 2015)
Event
494
West Java/DKI Jakarta/Banten
Third
Advocacy
TOTAL
Trainers
North Sumatra
Quarter (Apr-
Study Tour
Discussion
South Sulawesi/ Eastern Indonesia
Mar 2015)
Conference
Training
Total
Second
Seminar
Training of
First Quarter National (Oct - Dec Central Java 14) East Java
Quarter (Jan-
Workshop
Focus Group
1379
86
163
1233
80
0
25
143
3109
3814
257
3357
3550
129
0
113
983
12203
of Women
Spent for
Participation
Training
(%)
Activities
32,84%
$261.713,00
34,70%
$202.651,00
36,49%
$212.704,76
Total achievement of people trained in the IUWASH training related activities during this quarter
12.203
Total achievement of average of women participated in the IUWASH training related activities during this quarter
36,49%
Total achievement of budget spent for the IUWASH training related activities during this quarter
$212.704,76
Total achievement of people trained in the IUWASH training related activities in PY5
29.651
Total achievement of average of women participated in the IUWASH training related activities in PY5
34,68%
Total achievement of budget spent for the IUWASH training related activities in PY5
$677.068,76
Total achievement of people trained in the IUWASH training related activities in PY4
15.177
Total achievement of average of women participated in the IUWASH training related activities in PY4
32,67%
Total achievement of budget spent for the IUWASH training related activities in PY4
$599.798,37
Total achievement of people trained in the IUWASH training related activities in PY3
22.078
Total achievement of average of women participated in the IUWASH training related activities in PY3
33,64%
Total achievement of budget spent for the IUWASH training related activities in PY3
$587.110,94
Total achievement of people trained in the IUWASH training related activities in PY2
14.834
Total achievement of average of women participated in the IUWASH training related activities in PY2
35,07%
Total achievement of budget spent for the IUWASH training related activities in PY2
$368.016,55
Total achievement of people trained in the IUWASH training related activities in PY1
417
Total achievement of average of women participated in the IUWASH training related activities in PY1
31,88%
Total achievement of budget spent for the IUWASH training related activities in PY1
$4.445,00
To-date achievement of people trained in the IUWASH training related activities
82.157
To-date achievement of average of women participated in the IUWASH training related activities
33,59%
To-date achievement of budget spent for the IUWASH training related activities
$2.236.439,62
Total Target of People Trained in the IUWASH training related activities over the life of the project Percentage of people trained in the IUWASH training related activities
75.000 109,54%
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Section 3
ACHIEVEMENT OF IUWASH PMP OUTCOME OF COMPONENT 1 (MD): DEMAND MOBILIZATION FOR IMPROVED WATER AND SANITATION SERVICES, STATUS OF JUNE 2015 1. Summary of civil society groups and/or government institution implementing programs to mobilize improved access to safe drinking water and adequate sanitation (MD-2) Number of Regional South Sulawesi/ Eastern Indonesia
City/District
Government
Civil Society
Institution
Group
Kota Makassar
2
0
Kabupaten Takalar
2
0
Kota Parepare
2
0
6
0
Total
Total government institutions and CSOs implementing program to
Remarks The government institutions are District Health and Bappeda Offices that recently provide supports to STBM Programs in Kota Makassar The government institutions are Bappeda and Public Works Offices that recently provide supports to STBM Programs in Kabupaten Takalar The government institutions are Bappeda and Public Works Offices that recently provide supports to STBM Programs in Kota Parepare 6
mobilize access to safe drinking water and adequate sanitation during this reporting period Total government institutions and CSOs implementing program to
157
mobilize access to safe drinking water and adequate sanitation in PY5 Total government institutions and CSOs implementing program to
40
mobilize access to safe drinking water and adequate sanitation during PY4 Total government institutions and CSOs implementing program to
36
mobilize access to safe drinking water and adequate sanitation during PY3 Total government institutions and CSOs implementing program to
6
mobilize access to safe drinking water and adequate sanitation during PY2 Total government institutions and CSOs implementing program to
0
mobilize access to safe drinking water and adequate sanitation during PY1 To-date achievement of government institutions and CSOs
239
implementing program to mobilize access to safe drinking water and adequate sanitation Total Target of government institutions and CSOs implementing
100
program to mobilize access to safe drinking water and adequate sanitation over the life of the project Percent To-date Achievement of government institutions and CSOs
239%
implementing program to mobilize access to safe drinking water and adequate sanitation
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
17
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Section 4
ACHIEVEMENT OF IUWASH PMP OUTCOME OF COMPONENT I1 (IC): CAPACITY IMPROVEMENTS TO PROVIDE SUSTAINABLE SAFE WATER AND SANITATION SERVICE, STATUS OF JUNE 2015 1. Summary of Achievement of Small and Medium Business Providing Affordable Construction and Sanitation Facility Management Services (IC-6)
No 1
Region
City
Central Java
Kabupaten
Wirausahawan Sutikno
Name of SME
Provide individual sanitation system marketing and promotion. Also
Type of SME Support
Kudus
"Jamban Sehat Texnoyun"
provide construction of national standard individual sanitation facility
Kabupaten
Wirausahawan Sunarti
Type of IUWASH Support Promotion & marketing support for sanitation program
in Kabupaten Kudus 2
Klaten
Provide individual sanitation system marketing and promotion. Also
Promotion & marketing support for sanitation program
provide construction of national standard individual sanitation facility in Kabupaten Klaten
3
Kabupaten
Wirausahawan Dunung
Provide individual sanitation system marketing and promotion. Also
Klaten
Sutoto
provide construction of national standard individual sanitation facility
Promotion & marketing support for sanitation program
in Kabupaten Klaten 4
Kota Semarang Wirausahawan Yuli Kurniasih Purwanti "Giga"
Provide individual sanitation system marketing and promotion. Also
Promotion & marketing support for sanitation program
provide construction of national standard individual sanitation facility in Kota Semarang
5
Kabupaten
Wirausahawan Dina Merisa Provide individual sanitation system marketing and promotion. Also
Klaten
Damanik
Kabupaten
Wirausahawan Agus
Provide individual sanitation system marketing and promotion. Also
Sukoharjo
Wiyono
provide construction of national standard individual sanitation facility
Kabupaten
Wirausahawan Ahmad Rifai Provide individual sanitation system marketing and promotion. Also
Rembang
"Usaha Sanitasi Rembang"
Kabupaten
Wirausahawan Mardiyono
Promotion & marketing support for sanitation program
provide construction of national standard individual sanitation facility in Kabupaten Klaten
6
Promotion & marketing support for sanitation program
in Kabupaten Sukoharjo 7
Promotion & marketing support for sanitation program
provide construction of national standard individual sanitation facility in Kabupaten Rembang
8
Sukoharjo
Support to the construction of individual latrine facility. Provide
Promotion & marketing support for sanitation program
individual sanitation system marketing and promotion. Also provide construction of national standard individual sanitation facility in Kabupaten Sukoharjo
9
Kabupaten
Wirausahawan Sidik
Provide individual sanitation system marketing and promotion. Also
Rembang
Darmanto "Liang"
provide construction of national standard individual sanitation facility
Kabupaten
KSU Mitra Mandiri
Promotion & marketing support for sanitation program
in Kabupaten Rembang 10
11
South
Support to the construction of individual latrine facility. Support
Promotion & marketing support-,Micro-credit for SME
Sulawesi/Eastern Maros
sanitation program on individual latrine facility construction. Also
on sanitation program
Indonesia
active in farming and financial program activity Kabupaten Maros
UD. Hariyanti
Support to the construction of individual latrine facility. Provide
Promotion & marketing support-,Micro-credit for SME
individual sanitation system marketing and promotion. Also provide
on sanitation program
construction of national standard individual sanitation facility in Kabupaten Maros Total SME Provided Affordable Construction and Sanitation Facility during this Quarter Total SME Provided Affordable Construction and Sanitation Facility during previous Quarter in PY5
11 8
Total SME Provided Affordable Construction and Sanitation Facility in PY5
19
Total SME Provided Affordable Construction and Sanitation Facility in PY4
6
Total SME Provided Affordable Construction and Sanitation Facility in PY3
4
Total SME Provided Affordable Construction and Sanitation Facility in PY2 To-date Achievement of SME Provided Affordable Construction and Sanitation Facility
0 29
Total Target over the life of the project on SME Provided Affordable Construction and Sanitation Facility
30
To-date percentage of the achievement of SME Provided Affordable Construction and Sanitation Facility
96,67%
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
18
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Section 5
ACHIEVEMENT OF IUWASH PMP OUTCOME OF COMPONENT I1I (EE): CREATE ENABLING ENVIRONMENT SUPPORTING EQUITABLE WATER AND SANITATION SERVICES, STATUS OF JUNE 2015 1. Summary of Achievement of Local Government Priority to Support Watsan Sector (EE-1-a) - Supportive Policy No
City
Subject of Policy
Type of Policy
Achievement of the Development of Improved Policy of Watsan Sector Mar-12
Sep-12
Mar-13
Sep-13
Des-13
Mar-14
Jun-14
Sep-14
Des-14
Mar-15
Jun-15
A. North Sumatra Kota Binjai 1
Kota Medan
Mar-16
Sep-16
Remarks Signed
Perwal
1
Perwal
2
Perwal
3
Domestic Waste Water Management Organization and Task Function of
N/A
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
C
C
Signed on 31
Ongoing
Ongoing
Ongoing
C
C
C
Oct 2014 Signed on 20
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
C
C
C
C
C
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Waste Management Unit (UPTD). Establishment of Citizen Engagement Mechanism. Acceleration of Offsite System
2
Sep-15
Draft alrea Ongoing
Development (Percepatan
Perwal
4
SK Walikota
5 Tirta Bulian Tebing Tinggi 2013-
Oct 2014 Cancelled Signed on 12 May 2014
Pengembangan Sistem Pengelolaan Air Limbah Terpusat)
Kota Tebing Tinggi
Pengesahan Business Plan PDAM
Perwal
6
Perwal
7
Perwal
5
Kota Pematang SK Walikota Siantar
Kota Tanjung Balai
6 7 Kota Sibolga
8
Kabupaten Asahan
9
8 9
Establishment of Citizen
N/A
N/A
Ongoing
Ongoing
Ongoing
C
C
C
C
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Ongoing
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
C
C
C
N/A
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
C
C
C
N/A
N/A
Ongoing
C
C
C
C
C
C
C
C
N/A
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
N/A
N/A
Ongoing
C
C
C
C
C
C
C
C
N/A
N/A
Ongoing
Ongoing
C
C
C
C
C
C
C
N/A
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
C
C
C
N/A
Ongoing
Ongoing
Ongoing
C
C
C
Ongoing
C
C
C
C
Ongoing
Ongoing
Signed on 26 May 2014
Engagement Mechanism. Domestic Waste Water Management Establishment of a Waste Drinking Water Tariff for Pematang
SK Walikota
11
Local Government Equity Transfer
12 Business Plan PDAM Tirta Kualo
Perwal
13 Domestic Wastewater Management. 14
Establishment of a Waste
Perwal
15
SK Bupati
16 Business Plan PDAM
Perbup
17
Perwal
18 Raw Water Protection
Perwal
19 Domestic Wastewater Management
Perbup Perbup
21
Perbup
22
Establishment of a Waste
Organisasi dan tata Kerja Pejabat
Batu
Pengelola Informasi dan
23
N/A
N/A
Signed on 28 Oct 2014
N/A
N/A
N/A
N/A
N/A
Ongoing
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
N/A
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
C
C
N/A
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Signed on 24 Sept 2014
Signed on 10 Dec 2014
N/A
N/A
N/A
N/A
N/A
Ongoing
N/A
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
C
C
N/A
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
C
C
N/A
Ongoing
Ongoing
C
C
C
C
Signed on 3 Des 2014 Signed on 20 Oct 2014
Engagement Mechanism.
Kab. Labuhan Perbup
N/A
Management Unit (UPTD) Establishment of Citizen
Signed in 28 Oct 2014
N/A
Engagement Mechanism
20 Domestic Wastewater Management
Signed on 1 Nov 2013
Engagement Mechanism
Establishment of Citizen
Signed on 12 August 2013
Management Unit (UPTD) Establishment of Citizen
Signed on 5 July 2013
to PDAM
SK Walikota
Signed on 11 Nov 2014
Siantar
10 Raw Water Protection
Signed on 11 Nov 2014
Management Unit (UPTD).
Perwal
Perwal
Kab. Langkat
N/A
2017
3
4
N/A
N/A
N/A
N/A
N/A
Signed on 24 July 2014
Dokumentasi dilingkungan Pemerintah/PPID (CEM)
B. West Java/DKI Jakarta/Banten Kota Bogor
23
Perda
Perda No. 16 Tahun 2011 tentang
C
C
C
C
C
C
C
C
C
C
C
Signed on 7
C
C
C
C
C
C
C
C
C
C
C
Signed on 7
24 Perusahaan Daerah Air Minum
December
(PDAM) Tirta Pakian Kota Bogor Perda
Perda no. 17 Tahun 2012 tentang 25
2011
Pengelolaan Perusahaan Daerah
December
Air Minum (PDAM) Tirta Pakuan
2011
Bogor Perda
Perda No. 20 Tahun 2011 tentang
10
C
C
C
C
C
C
C
C
C
C
C
Signed on 20
Perubahan atas Perda Kota Bogor
December
No. 7/2010 tentang Penyertaan
2011
26 Modal Daerah kepada PDAM Tirta Pakuan, PD BPR Bank Pasar, PD Jasa Transportasi dan PD Pasar Pakuan Jaya Kota Bogor Perda SK Walikota
27 Waste Water Management 28
Organizational Structure of the
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
PDAM
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
19
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
No
City
Type of Policy SK Bupati
11
Kab. Karawang Perbup Perwal
12 Kota Bekasi
Perwal No. 68/2014 Perwal
13 14
Kab. Bekasi Kab.
Perda SK Bupati
Purwakarta Perbup
15 Kab. Bandung Perbup Perbup
16 Kab. Serang
Kab. Lebak
29 Tariff Adjustment 30 31 32 33 34
44
Kota Selatan
Perwal Perwal
45 46
Jun-14
Sep-14
Des-14
Mar-15
Jun-15
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
C
C
C
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
C
Ongoing
Ongoing
Ongoing
C
C
Ongoing
Ongoing
C
C
Establishment of a Waste
N/A
N/A
Mar-16
Sep-16
Remarks
Signed on 4 Signed on April 2015 Signed on 31 Dec 2014 Signed on 4 Nov 2014
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
C
C
C
C
C
Signed on 16
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
C
C
Dec 2013 Signed on 15
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
N/A
N/A
N/A
N/A
N/A
Ongoing
Ongoing
C
C
C
C
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
C
C
C
C
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Management Unit (UPTD)
Establishment of a Waste
Sep-15
Aug 2014 N/A
Based Total Sanitation
Jan 2015
Management Unit (UPTD)
Establishment of a Waste
Establishment of UPTD wastewater
Signed on 30 June 2014 Signed on 11 Sept 2014
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Ongoing
C
C
C
C
C
C
C
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
N/A
Ongoing
Ongoing
Ongoing
C
C
C
C
C
Signed on 9 October 2013
Management Unit (UPTD)
42 Tariff Adjustment
Kab Tangerang Perbup
Mar-14
N/A
Implementation of Community
38 Community-Based Total Sanitation.
43
Des-13
N/A
Tirta Patriot
40 Raw Water Protection
Perbup
Sep-13
N/A
Minimum Service Standard PDAM
37 RISPAM
41
Mar-13
Susunan Organisasi UPTD kePUan
Perbup
18
19 Tangerang
Perub Perwal ttg Pembentukan dan
39 Regionalization of Water Supply
Perbup
Sep-12
Sistem Penyediaan Air Minum
35 Tariff Adjustment PDAM 36
Achievement of the Development of Improved Policy of Watsan Sector Mar-12
Rencana Induk Pengembangan
Perbup
SK Bupati 17
Subject of Policy
management Establishment of a Waste
N/A
N/A
Regionalization of Raw Water
Signed on 18 February 2014
Management Unit (UPTD) N/A
N/A
N/A
Ongoing
Ongoing
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Ongoing
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
C
C
C
C
C
C
C
C
Ongoing
C
C
C
C
C
C
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Supplies Establishment of a Waste Management Unit (UPTD)
C. Central Java Perwal
Actions Plan of the LG for Water 47 Supply and Environmental
Perwal 20 Kota Semarang Perwal Perwal Perwal
21 Kota Surakarta
SK Walikota SK Walikota Perbup
22 Kab. Kudus
48 49 50
Community Based of Water and
53 54
Perbup
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
C
C
C
Signed on 6
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
C
C
C
Signed on 13
C
C
C
C
C
C
C
C
C
C
C
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
N/A
N/A
N/A
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Signed on 24 Dec 2013
Management Unit (UPTD) Pusat Pengelolaan Pengaduan
Oct
Masyarakat
51 Sludge Management 52
2012 N/A
Ongoing
Sanitation Management. Establishment of a Waste
Signed on 28 December
Management.
Slum Area Location and City Sanitation Development Sludge Collection and Wastewater
August Signed on 8 May 2012
Tariff. Establishment of a Waste Management Unit (UPTD) Peraturan Bupati (District Head
55 Regulation) for Citizen Engagement Mechanism Perbup Perda 23
Kab. Kendal Perbub
24 Kab. Semarang
Perda Perbup
56 57 58 59
61
Kota Salatiga Perwal Perbup
Health Action Plan Local Government Equity Transfer Establishment of a Waste
26 Kab. Rembang Perda 64
Signed on 5 September
N/A
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
C
C
C
C
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Management Unit (UPTD) Penyertaan Modal Daerah pada PDAM
Establishment of a Waste
Signed on 23 April 2013
Management Unit (UPTD)
62 Raw Water Protection 63
Signed on 28 January 2013
to the PDAM
60 Raw Water Protection
Perwal 25
Water Supply and Environmental
Establishment of a Waste
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
C
C
C
C
C
N/A
N/A
N/A
N/A
C
C
C
C
C
C
C
Management Unit (UPTD) Local Government Equity Transfer
Signed on 4 April 2014
to the PDAM
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
Signed on 4 September 2013
20
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
No
City
Subject of Policy
Type of Policy Perbup 65
27 Kab. Sukoharjo Perbup Kab. Klaten 28
Perbup Perbup
Kab. Batang
Perbup Perbup
29
Perbup
66
Establishment of a Waste
Establishment of Citizen
Mar-13
Sep-13
Des-13
Mar-14
Jun-14
Sep-14
Des-14
Mar-15
Jun-15
N/A
N/A
N/A
Ongoing
Ongoing
C
C
C
C
C
C
Mar-16
Sep-16
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
C
C
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
C
C
C
C
C
C
C
C
C
C
C
Signed on 25 Signed on 20
Signed on 27 December 2013
Engagement Mechanism
68 CEM development
70
Sep-15
Remarks
Sep-12
Management Unit (UPTD)
67 PDAM customer reclassification
69
Achievement of the Development of Improved Policy of Watsan Sector Mar-12
Establishment of a Wastewater
Dec 2014
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Ongoing
C
C
C
C
C
N/A
N/A
N/A
Ongoing
Ongoing
C
C
C
C
C
C
October 2013
Management Unit (UPTD)
71 PDAM Organizational Structure
Signed on 22 August 2014
N/A
Ongoing
Management Unit (UPTD) Tupoksi of a Wastewater
Signed on 8
March 2014 Signed on 16 Dec 2013
D. East Java Kab. Sidoarjo
Perbup 72
30 Perbup Kab. Gresik
Perbup SK Bupati
31
Perbup Kab. 32
Perbup
Lamongan Perbup Kota
Perda
33 Probolinggo Perwal Kab.
74
78
Revisi Tupoksi UPTD Pengelolaan
N/A
Ongoing
Ongoing
C
C
C
C
C
C
Signed on 9 December 2013
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
C
C
N/A
N/A
N/A
Ongoing
Ongoing
C
C
C
C
C
C
C
C
C
C
C
C
C
Ongoing
Ongoing
Signed on March 2015 Signed on 31 Dec 2013
N/A
N/A
N/A
Ongoing
N/A
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
C
C
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Signed on 18 Oct 2013 03-Feb-15
Air Limbah Rencana Induk SPAM (RISPAM)
N/A
N/A
N/A
N/A
Ongoing
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
C
C
C
C
C
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
C
C
C
Kab. Lamongan
79 Pengelolaan Air Limbah Domestik 80 Raw Water Protection Perubahan atas Perbup No. 81
N/A
Management Unit (UPTD)
76 CEM development
Signed on 30 May 2014
26/2008 tentang Uraian tugas dan
Signed on 3 Nov 2014
fungsi Badan Lingkungan Hidup untuk PAL Domestik
34 Perbup Perbup 35
Establishment of a Wastewater
75 PDAM Tariff Adjustment
77
N/A
Management Unit
73 CEM development
Perbup
Probolinggo
Establishment of Waste
Kab.
Perda
Mojokerto Perbup
82 CEM development 83 Raw Water Protection 84 Raw Water Protection 85
Perbup
Establishment of a Wastewater
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
C
C
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Nop 2014
N/A
N/A
N/A
Ongoing
C
C
C
C
C
C
Signed on 6
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
C
C
C
C
C
Signed on 2
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
C
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
C
C
Management Unit (UPTD) Tupoksi Organisasi dan Tata Kerja
signed on 20
January 2014
86 Dinas Pekerjaan Umum Cipta
January 2014
Karya dan Tata Ruang Perbup No. 14/2015
Pemberdayaan Masy dalam
27-Apr-15
87 Pengelolaan Air Minum dan Sanitasi (CEM development ?) Kota
Peraturan Walikota
Mojokerto SK Walikota
36
Perwal Kab. Jombang
Perbup
37 Perbup Kota Malang
Perwal
38 Perwal Kab. Malang
40
Establishment of a Wastewater Management Unit (UPTD)
89 PDAM Business Plan
91
Establishment of a Wastewater
93
Rencana Induk SPAM (RISPAM)
N/A
Ongoing
Ongoing
Ongoing
C
C
C
C
C
C
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
N/A
N/A
N/A
N/A
N/A
N/A
Ongoing
C
C
C
C
C
C
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing Ongoing
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
N/A
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
C
Perwal
97 Raw Water Protection
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
C
C
C
C
C
Perwal
98
Establishment of a Wastewater
Signed on 2 Feb 2014
96 Raw Water Protection
95
Signed on 24 March 2014
N/A
Kota Malang
94 Raw Water Protection
Signed on 2 Jan 2015
N/A
Management Unit (UPTD)
92 Raw Water Protection
Signed on 3 Dec 2014
C
90 STBM
Perbup No. 8/2015
Perbup
39 Kota Batu
88
Management Unit (UPTD)
Establishment of a Wastewater Management Unit (UPTD)
15-Apr-15 Signed on 2 May 2014
E. South Sulawesi/Eastern Indonesia
41 Kota Makassar
42
Kab. Takalar Kab. Maros
43
44
Perda
99 Wastewater Management
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Perwal
100 Wasterwater Management
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Ongoing
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Ongoing
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
C
C
C
C
Signed on 4
Ongoing
C
C
C
C
C
C
C
August 2014 Signed on 5 Sep 2013 Signed on 7
Perwal Perbup Perbup Perbup Perbup
Kab. Jeneponto Perbup Kab. Bantaeng Perbup
45
Perbup
101 102 103 104 105
Tatacara pemberian pengurangan retribusi pelayanan air limbah SOP Penanganan Pengaduan Masyarakat (CEM) Local Government Equity Transfer
N/A
N/A
Ongoing
to PDAM Establishment of a Waste
N/A
N/A
N/A
N/A
Ongoing
Ongoing
C
C
C
C
C
Ongoing
Ongoing
Ongoing
C
C
C
C
C
C
C
C
Ongoing
Ongoing
Ongoing
Ongoing
Management Unit (UPTD) SOP Penanganan Pengaduan
108
May 2014
Masyarakat (CEM)
106 Raw Water Protection 107
Ongoing
SOP Penanganan Pengaduan
Signed on 21 May 2013
N/A
N/A
N/A
N/A
N/A
Ongoing
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
N/A
N/A
N/A
N/A
N/A
C
C
C
C
C
C
N/A
Masyarakat (CEM) Establishment of a Wastewater Management Unit (UPTD)
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
Signed on 27 March 2014
21
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
No
City
Type of Policy
Kota Parepare Perwal Perwal 46
Subject of Policy 109 Raw Water Protection 110
Perwal
Establishment of a Waste Management Unit (UPTD). Improvement of Perwalikota
Achievement of the Development of Improved Policy of Watsan Sector Mar-12
Sep-12
Mar-13
Sep-13
Des-13
Mar-14
Jun-14
Sep-14
Des-14
Mar-15
Jun-15
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Sep-15
Mar-16
Sep-16
Remarks
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
C
C
C
C
C
Signed on 7
Ongoing
Ongoing
Ongoing
C
C
C
C
C
C
C
C
May 2014 signed on 9
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
N/A
N/A
N/A
Ongoing
Ongoing
Ongoing
C
C
C
C
C
N/A
N/A
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
N/A
N/A
N/A
N/A
N/A
N/A
Ongoing
C
C
C
C
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
111 Parepare No. 52 Tahun 2011 on
Oct 2012
SOP Penanganan Keluhan Masy Kab. Enrekang Perbup 47
Perbup Perbup
48 Kab. Sidrap Kab. Pinrang 49
Perbup Perbup Perbup
50 Kota Ambon
Perwal
112 Raw Water Protection. 113
116 Raw Water Protection 117 Establishment of UPTD Air Limbah
118
119
52 Kota Jayapura Illegal Connection PDAM Jayapura Kota Jayapura Perwal
Establishment of a Waste
June 2014 N/A
N/A
N/A
N/A
N/A
N/A
Ongoing
Ongoing
C
C
C
C
C
C
Ongoing
Ongoing
Ongoing
Ongoing
C
C
C
C
C
C
C
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
C
C
C
C
C
Sept 2014
C
C
Signed on 27
Signed on 27 Dec 2013 Signed on 30 Sept 2013
pengguna/pemakai air minum
Signed on 8
secara tidak sah pada PDAM Establishment of a Waste
Signed on 30
Ongoing
Jayapura (Illegal Connection). 120
Signed on 16 May 2014
Management Unit (UPTD) Penertiban terhadap
Walikota dan Bupati Jayapura tentang
Masyarakat (CEM)
115 Drinking Water Tariff PDAM
Peraturan Bersama 51 Kab Jayapura
SOP Penanganan Pengaduan
114 Raw Water Protection
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
C
C
C
C
Management Unit (UPTD)
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
Sept 2013
22
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
2. Summary of Achievement of Local Government Priority to Support Watsan Sector (EE-1-a) – Local Government Budget Allocation WATSAN allocation of Local Government Budget/APBD (In Million IDR) No
City
A. North Sumatra
Year 2009
Year 2010
Year 2011
Year 2012
Year 2013
Remarks (**)
Year 2014
Avg Baseline *
Avg Endline Increase / **
(Decrease)
221.426
281.034
311.325
328.178
198.057
434.688
296.150
330.442
34.292
8.445
5.863
11.409
17.219
11.117
36.720
8.572
21.685
13.113
183.349
239.876
230.473
195.849
32.426
281.535
217.899
169.936
(47.963)
5.378
8.294
9.975
31.332
23.057
10.835
7.882
21.741
13.859
31.662
26.944
10.358
26.124
15.767
1
Kota Binjai
2
Kota Medan
3
Kota Pematang Siantar
4
Kota Tanjung Balai
10.828
7.403
12.843
19.767
5
Kota Tebing Tinggi
13.426
7.453
10.519
12.643
4.453
10.450
10.466
9.182
(1.284)
6
Kabupaten Langkat
-
-
12.200
17.248
19.895
36.270
14.724
28.082
13.358
7
Kabupaten Asahan
-
10.392
12.296
15.753
31.861
5.222
12.814
18.542
5.728
8
Kabupaten Labuhan Batu
-
1.754
5.264
7.576
8.015
24.126
4.864
16.071
11.206
9
Kota Sibolga
6.347
10.793
35.571
2.585
8.570
19.078
10.508
B. West Java
67.091
-
150.420
-
159.683
148.307
194.717
254.854
140.057
211.123
71.066
10 Kota Bogor
31.615
67.075
71.135
44.787
62.474
58.718
56.608
55.327
(1.282)
11 Kabupaten Karawang
23.571
25.656
20.807
14.303
16.436
28.200
23.345
19.647
(3.698)
12 Kota Bekasi
11.904
24.489
23.616
46.239
53.205
73.604
20.003
57.683
37.679
13 Kabupaten Bekasi
-
14.506
14.139
14.136
24.013
36.691
14.260
30.352
16.092
14 Kabupaten Bandung
-
10.202
17.652
17.529
20.220
34.181
15.128
27.200
12.073
15 Kabupaten Purwakarta
-
8.492
12.335
11.312
18.370
23.460
10.713
20.915
10.202
16.948
28.234
79.728
100.211
115.611
131.325
57.631
121.108
63.478
59
839
20.985
32.817
35.871
37.159
7.294
35.282
27.988
16.889
18.123
14.362
19.413
19.913
25.674
16.458
21.666
5.209
-
7.488
40.754
43.408
54.121
46.963
30.550
50.542
19.992
C. Banten 16 Kab. Tangerang 17 Kab. Serang 18 Kota Tangerang Selatan 19 Kab. Lebak D. Central Java
1.784
3.627
4.574
5.706
21.529
3.328
13.618
10.290
44.778
-
74.304
61.863
136.351
172.820
316.419
78.194
218.280
140.086
20 Kabupaten Kendal
7.905
13.215
1.330
5.582
6.124
14.403
7.483
8.703
1.220
21 Kabupaten Kudus
11.477
1.951
600
3.552
13.501
26.521
4.676
14.525
9.849
22 Kota Semarang
17.394
19.225
15.571
50.153
72.677
99.311
17.397
74.047
56.650
23 Kabupaten Semarang
2.273
2.532
3.460
16.669
6.683
29.756
2.755
17.702
14.948
24 Kota Solo
5.730
8.022
9.441
6.758
13.265
41.224
7.731
20.416
12.685
25 Kabupaten Sukoharjo
-
5.250
7.632
9.714
10.417
34.964
7.532
22.690
15.159
26 Kabupaten Klaten
-
8.682
11.175
21.979
17.791
24.720
13.946
21.256
7.310
27 Kota Salatiga
-
11.373
6.518
14.920
15.444
15.728
10.937
15.586
4.649
28 Kabupaten Rembang
-
2.585
3.380
3.239
5.424
14.998
3.068
10.211
7.143
29 Kabupaten Batang E. East Java
105.202
1.469
2.757
3.785
11.495
14.794
2.670
13.144
10.474
169.207
140.667
202.983
363.179
416.840
181.332
353.742
172.410
30 Kab. Gresik
18.938
18.876
15.185
17.354
11.338
11.210
17.667
13.301
(4.366)
31 Kab. Lamongan
33.071
19.485
18.507
26.025
70.920
85.042
23.688
60.662
36.974
32 Kab. Mojokerto
12.753
5.883
7.543
9.450
29.202
25.717
8.726
21.456
12.730
33 Kab. Sidoarjo
29.071
15.483
12.490
18.125
53.105
48.848
19.014
40.026
21.012
34 Kota Probolinggo
11.368
3.723
7.607
3.108
10.018
20.327
7.566
11.151
3.585
35 Kab. Probolinggo
-
5.388
7.133
15.132
24.306
32.095
9.218
28.201
18.983
36 Kota Mojokerto
-
6.042
10.227
8.547
7.689
18.736
8.272
13.212
4.941
37 Kab. Jombang
-
18.332
15.197
10.989
23.263
36.933
14.839
30.098
15.259
38 Kota Malang
-
20.849
10.686
29.640
21.303
49.164
20.392
35.233
14.842
39 Kab. Malang
-
15.731
17.689
8.870
11.260
18.430
14.096
14.845
749
40 Kota Batu
-
39.417
18.402
55.744
100.775
70.338
37.855
85.556
47.702 129.205
40.533
61.600
68.562
91.450
186.372
261.347
59.303
188.507
41 Kota Enrekang
F.
South Sulawesi
10.390
28.116
5.229
18.723
10.822
16.336
14.578
15.294
716
42 Kota Makassar
7.086
12.972
14.579
46.434
83.652
130.351
11.546
86.812
75.266
43 Kota Jeneponto
4.628
4.918
8.816
2.539
9.938
22.147
6.121
11.541
5.421
44 Kota Maros
8.465
1.472
3.268
6.109
25.529
27.421
4.401
19.686
15.285
45 Kota Pare Pare
8.220
7.018
8.465
6.421
11.500
19.886
7.901
12.602
4.701
46 Kabupaten Takalar
1.745
1.694
11.433
4.012
14.481
8.529
4.957
9.007
4.050
47 Kabupaten Bantaeng
-
2.101
5.959
2.491
7.500
13.865
3.517
10.683
7.166
48 Kabupaten Pinrang
-
1.655
5.407
2.360
13.963
13.720
3.141
13.841
10.701 5.899
49 Kabupaten Sidrap
1.655
5.407
2.360
8.987
9.093
3.141
9.040
10.401
27.896
27.284
14.779
33.905
43.849
21.861
30.845
8.984
50 Kota Jayapura
3.818
1.968
6.464
4.180
14.334
17.086
4.083
11.867
7.784
51 Kota Ambon
6.583
25.928
20.820
10.599
19.571
26.763
17.777
18.978
1.200
52 Kab. Jayapura
-
-
-
-
-
-
G. Eastern Indonesia
TOTAL
-
506.380
792.696
849.112
1.022.259
1.264.662
1.859.322
no information 834.527
1.454.047
619.521 74%
(*) The baseline figures is average of last 3 years (2009, 2010 and 2011 for old cities in yellow highlight and 2010, 2011, 2012 for new cities in orange highlight) of APBD budget to support the development of watsan sector. (**) The endline figures is average of following years (2012 to 2014 for old cities in yellow highlight and 2013 to 2014 for new cities in orange highlight) of APBD budget to support the development of watsan sector.
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
23
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
3. Summary of Achievement of Financial Resources Accessed by Service Providers from PPP to Support the Expansion of Improved Watsan Services (EE-3) Type of Funding No
City
Program Description
Partners Involved
Sources (Public or Private)
A. 1
Amount
Remark
Leveraged ($)
North Sumatra Kabupaten
Micro Credit Program for Water
PDAM Kab.Langkat and Koperasi Private funding
Langkat
Connection
Karyawan PDAM
8.640,00 The signing of the MoU between PDAM Cooperative and PDAM Kab.Langkat was conducted in 28 September 2012
B.
West Java/Banten/DKI Jakarta
2
Kabupaten
Equity fund for PDAM Tirta Tarum
Karawang
PDAM Tirta Tarum
Public funding
Kab.Karawang
909.090,91 The funding is from APBD 2015 Kabupaten Karawang and used as equity fund for PDAM Tirta Tarum Kabupaten Karawang
3
Kota Bekasi
Equity fund for PDAM Tirta Patriot
PDAM Tirta Patriot and PDAM
and PDAM Tirta Bhagasasi
Tirta Bhagasi
Public funding
2.200.000,00 The funding is from APBD 2015 Kota Bekasi and used as equity fund for 2 Local Governance's Companies : PDAM Tirta Patriot and PDAM Tirta Baghasasi
C.
Central Java
4
Kabupaten Klaten Clean Water and Wastewater
Pokja AMPL Kabupaten Klaten
Public funding
188.175,36 The funding is from APBD 2015 of Kabupaten
Treatment Development Program
Klaten used as operational fund, financial support of
(Clean Water)
Community Based Environmental Sanitation Facility and Infrastructure Improvement Program for Clean Water
5
Kabupaten Klaten Clean Water and Wastewater
Pokja AMPL Kabupaten Klaten
Public funding
104.545,45 The funding is from APBD 2015 of Kabupaten
Treatment Development Program
Klaten used for sanitation facility and infrastructure
(Sanitation)
constructionan also for unhealthy houses program of Community Based Environmental Sanitation Facility and Infrastructure Improvement Program for Sanitation
6
Kota Salatiga
Construction of Sanitation Facility by
PNPM Mandiri Perkotaan Kota
PNPM Mandiri
Salatiga
Public funding
33.435,00 The funding is from APBN & APBD 2014 of Kota Salatiga and also community contribution to PNPM Mandiri Program on construction of sanitation facilities in Kota Salatiga
7
Kabupaten Batang Construction of Sanitation Facility by PNPM Mandiri
PNPM Mandiri Perkotaan
Public funding
Kabupaten Batang
155.596,27 The funding is from APBN & APBD 2014 of Kabupaten Batang and also community contribution to PNPM Mandiri Program on construction of sanitation facilities in Kabupaten Batang
5
Kota Semarang
Construction of Sanitation Facility by
PNPM Mandiri Perkotaan Kota
PNPM Mandiri
Semarang
Public funding
4.603,86 The funding is from APBD 2014 of Kota Semarang through DDUB (Dana Daerah Urusan Bersama) and also community contribution to PNPM Mandiri Program on construction of sanitation facilities in Kota Semarang
6
Kabupaten
Construction of Sanitation Facility by
PNPM Mandiri Perkotaan
Kendal
PNPM Mandiri
Kabupaten Kendal
Public funding
87.156,38 The funding is from APBD 2014 of Kabupaten Kendal, BLM and also community contribution to PNPM Mandiri Program on construction of sanitation facilities in Kabupaten Kendal
7
Kabupaten
Micro Credit Program for Water
Sukoharjo
Connection
PDAM Kabupaten Sukoharjo
East Java
8
Kabupaten
Micro Credit Program for Improved
BRI, Bank Jombang & SME of
Jombang
Sanitation Access
Sanitation Program
Kabupaten
Micro Credit Program for Improved
Hippams Banyu Urip Lamongan,
Lamongan
Sanitation Access
Kopdinkes & BRI
Kabupaten
Micro Credit Program for Improved
SME Kube Krisna & Sanitarian
Malang Kabupaten Mojokerto
Sanitation Access
Program
Kabupaten
Micro Credit Program for Improved
BRI and SME of Sanitation
Probolinggo
Sanitation Access
Program
Kabupaten
Micro Credit Program for Improved
10 11 12 13
8.209,09 The funding for the micro credit program is funded by PDAM Kabupaten Sukoharjo
D.
9
Private funding
Private funding
26.195,45 The micro credit program for sanitation is a result
Private funding
4.209,09 The micro credit program for sanitation is a result
Private funding
4.234,09 The micro credit program for sanitation is a result
Sanitation Access
Puskesmas
Micro Credit Program for Improved
BSM, PNM and SME of Sanitation Private funding
5.727,27 The micro credit program for sanitation is a result
Sidoarjo
Sanitation Access
14
Kota Mojokerto
Micro Credit Program for Improved
15
Kota Probolinggo Micro Credit Program for Improved
of the triggering program activities of the triggering program activities of the triggering program activities of the triggering program activities Private funding
3.886,36 The micro credit program for sanitation is a result
SME JM Tiga Srikandi
Private funding
12.545,45 The micro credit program for sanitation is a result
SME Sanitation Program
Private funding
BRI, CV.Wahana Tirta &
Private funding
of the triggering program activities of the triggering program activities
Sanitation Access Sanitation Access
3.677,27 The microcredit program for sanitation is a result of triggering program activities
Individual Sanitarian
14.072,73 The micro credit program for sanitation is a result of the triggering program activities
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
24
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type of Funding No
City
Program Description
Partners Involved
Sources (Public or Private)
E.
South Sulawesi/Eastern Indonesia
16
Kabupaten
Micro Credit Program for Water
PDAM Kabupaten Jeneponto &
Jeneponto
Connection
KSU Koppas Utama
Private funding
Amount
Remark
Leveraged ($)
9.409,09 The funding for the micro credit program is funded by PDAM Kabupaten Jeneponto and KSU Koppas Utama
17
Kabupaten Maros Micro Credit Program for Water
18
Kabupaten Sidrap Micro Credit Program for Water Connection
Denas 66
19
Kabupaten
Micro Credit Program for Water
Takalar
Connection
Connection
20
Kabupaten Maros Micro Credit Program for Improved
21
Kabupaten
Micro Credit Program for Improved
Pinrang
Sanitation Access
PDAM Kab.Maros, Koperasi
Private funding
2.118,18 The funding for the micro credit program is funded
Private funding
3.709,09 The funding for the micro credit program is funded
PDAM Kabupaten Takalar
Private funding
12.272,73 The funding for the micro credit program is funded
Koperasi Mitra Mandiri
Private funding
2.754,55 The micro credit program for sanitation is a result
Koperasi Denas 66
Private funding
3.454,55 The micro credit program for sanitation is a result
Koperasi Denas 66
Private funding
5.981,82 The micro credit program for sanitation is a result
Syariah BMT Al-Azhar PDAM Kabupaten Sidrap, KSU
by PDAM Kab.Maros by PDAM Kabupaten Sidrap by PDAM Kabupaten Takalar
Sanitation Access
22
Kabupaten Sidrap Micro Credit Program for Improved
of the triggering program activities of the triggering program activities
Sanitation Access Total Amount Leveraged during this quarter Total Amount Leveraged during previous quarter in PY5 Total Amount Leveraged to support the expansion of Improved Watsan Services in PY5
of the triggering program activities 3.813.700,04 7.111.761,85 10.925.461,89
Total Amount Leveraged to support the expansion of Improved Watsan Services in PY4
2.113.372,45
Total Amount Leveraged to support the expansion of Improved Watsan Services in PY3
10.448.417,22
Total Amount Leveraged to support the expansion of Improved Watsan Services in PY2 To-date of Amount Leveraged to support the expansion of Improved Watsan Services Total Baseline of FY 2012 Total Target over the life of the project (10% of the baseline) To-date percentage of the achievement of amount leveraged to support the expansion of Improved Watsan
9.732.488,56 33.219.740,12 282.270.200,00 28.227.020 11,77%
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
25
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
4. A. Summary of Achievement of Microfinance Program Supported Improved Watsan Sector (EE-4) No
City
Number of Household Increase
Number of People Increase Access to
Access to Improved Watsan
Improved Watsan
Water Supply A.
Sanitation
Water Supply
Sanitation
West Java/DKI Jakarta/Banten
1
Kab. Lebak
-
-
2
Kab.Tangerang
-
-
3
Kab.Serang
-
-
4
Kota Bekasi
-
-
5
Kab. Bandung
-
-
B.
Central Java
6
Kab. Kudus
-
-
7
Kab. Kendal
-
-
8
Kab. Klaten
-
-
9
Kab. Sukoharjo
645
-
10
Kab. Rembang
-
-
11
Kota Semarang
-
-
C.
East Java
12
Kab. Mojokerto
53
-
265
13
Kota Probolinggo
95
-
475
14
Kab. Sidoarjo
92
-
460
15
Kab. Jombang
199
-
995
16
Kota Surabaya
17
Kab. Lamongan
18
129
-
-
31
-
155
Kab. Malang
41
-
205
19
Kab. Probolinggo
48
-
240
20
Kab.Gresik
-
-
21
Kota Batu
-
-
22
Kota Mojokerto
-
105
D.
South Sulawesi/ Eastern Indonesia
23
Kab. Pinrang
24
Kab. Jeneponto
21 20 69
25
Kab.Sidrap
26
Kab.Takalar
180
27
Kab. Maros
20
28
Kab.Pare-pare
E.
North Sumatera
29
Kab.Labuhan Batu
30
Kab.Langkat
34
34 19
498
100 -
170
170
900
-
100
66 Total
345
-
-
-
330 653
95
-
2.490
Total Low Income Household Accessing Micro Finance Supported Improved Watsan during this
3.265 1.151
quarter Total Low Income Household Accessing Micro Finance Supported Improved Watsan in PY5
5.670
Total Low Income Household Accessing Micro Finance Supported Improved Watsan in PY4
6.870
Total Low Income Household Accessing Micro Finance Supported Improved Watsan in PY3
4.373
Total Low Income Household Accessing Micro Finance Supported Improved Watsan in PY2 To-date Achievement of Low Income Household Accessing Micro Finance Supported Improved Watsan Total Target of Low Income Household Accessing Micro Finance Supported Improved Watsan Percent To-date Achievement of Low Income Household Accessing Micro Finance Supported
983 17.896 15.000 119,31%
Improved Watsan
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
26
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
4. B. Summary of Achievement of Low Income Households Accessing Microfinance Supported Safe Water Services (EE-4) No
City
Name of PDAM
Name of Bank
Date of MoU Signing
Number of New PDAM Connections
Number of People Benefiting from Safe
during in FY 2015 Des-14
Mar-15
Jun-15
Water Supply during FY 2015 Sep-15
Des-14
Mar-15
Jun-15
Sep-15
Microfinance Supported New Water Connection
A. West Java 1
Kab. Serang
PDAM Kab. Serang
N/A (using PDAM funding)
N/A
0
151
0
0
755
0
2
Kota Bekasi
PDAM Kota Bekasi
N/A (using PDAM funding)
N/A
0
627
0
0
3135
0
PDAM Kab. Kudus
Bank Syariah Mandiri (BSM)
09-Jan-12
0
0
0
0
0
0 0
B. Central Java 3
Kab. Kudus
Cab.Kudus 4
Kab. Kendal
PDAM Kab. Kendal
N/A (using PDAM funding)
N/A
0
0
0
0
0
5
Kab. Klaten
PDAM Kab. Klaten
N/A (using PDAM funding)
N/A
345
7
0
1725
35
0
6
Kab. Sukoharjo
PDAM Kab. Sukoharjo
N/A (using PDAM funding)
N/A
537
785
129
2685
3925
645
7
Kab. Rembang
PDAM Kab. Rembang
N/A (using PDAM funding)
N/A
43
0
0
215
0
0
8
Kota Semarang
PDAM Kota Semarang
N/A (using PDAM funding)
N/A
8
0
0
40
0
0
PDAM Kab. Mojokerto
BSM Cabang Kab.Sidoarjo, BRI
10-Nop-11
0
166
0
0
830
0
17-Mar-09
0
139
0
0
695
0
C. East Java 9
Kab. Mojokerto
and Bank Jatim 10 Kota Surabaya
PDAM Kota Surabaya
BRI Cabang Kota Surabaya
D. South Sulawesi/ Eastern Indonesia 11 Kab. Pinrang
PDAM Kab. Pinrang
KSU Denas 66
12 Kab. Jeneponto
PDAM Kab. Jeneponto
N/A (using PDAM funding)
13 Kab. Sidrap
PDAM Kab. Sidrap
KSU Denas 66
14 Kab. Takalar
PDAM Kab.Takalar
N/A (using PDAM funding)
15 Kab. Maros
PDAM Kab.Maros
Koperasi Syariah BMT Al-Azhar
18-Jan-13
3
0
0
15
0
0
N/A
0
106
69
0
530
345
22-Apr-13
39
0
34
195
0
170
N/A
499
102
180
2495
510
900
06-Jul-13
20
0
20
100
0
100
N/A
0
30
0
0
150
0
28-Sep-12
28
0
66
140
0
330
1522 2113 Watsan during in each Quarter of this Year Total Low Income Household Accessing Micro Finance for new PDAM household connection during this quarter
498
7610
10565
2490
E. North Sumatera 16 Kab. Labuhan Batu PDAM Kab.Labuhan Batu
N/A (using PDAM funding)
17 Kab. Langkat
Kop.Karyawan PDAM
PDAM Kab.Langkat
Total Low Income Household Accessing Micro Finance for Household Improvements in 498
Total Low Income Household Accessing Micro Finance for new PDAM household connection up to previous quarter
13.854
To-date achievement of the total Low Income Household Accessing Micro Finance for new PDAM household connection
14.352
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
27
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
4. C. Summary of Achievement of Low Income Households Accessing Microfinance Number of Household Get increased Access Household Address
Name of No
City
Number of People Get increased Access to
to Improved Sanitation through Microfinance Improved Sanitation through Microfinance of of FY 2015
Institution Providing Loan
Name of Kelurahan/Village
Name of Sub-district
Des-14
Mar-15
FY 2015
Jun-15
Sep-15
Des-14
Mar-15
Jun-15
Sep-15
Microfinance Supported Improved Sanitation Services A. West Java/DKI Jakarta/Banten 1
Tambakbaya
Cibadak
0
0
0
0
0
0
2
Kaduagung Tengah
Cibadak
0
0
0
0
0
0
3
Mandala
Mandala
0
0
0
0
0
0
4
Pasir Tanjung
Rangkasbitung
0
0
0
0
0
0
Individual sanitarian, Kedaung Barat
Sepatan Timur
0
0
0
0
0
0
KPP UMKM Syariah
Jati Mulya
Sepatan Timur
3
0
0
15
0
0
7
Tanah Merah
Sepatan Timur
3
0
0
15
0
0
8
Kedaung
Sepatan Timur
10
0
0
50
0
0
9
Kelor
Sepatan Timur
1
0
0
5
0
0
10
Renged
Kresek
0
0
0
0
0
0
11
Talok
Kresek
0
0
0
0
0
0
12
Kp.Melayu Timur
Teluk Naga
1
0
0
5
0
0
13
Kebon Cau Kp.Cogrek
Teluk Naga
9
0
0
45
0
0
14
Kebon Cau Kp.Rotan
Teluk Naga
1
0
0
5
0
0
15
Kebon Cau Kp.Alang Kecil
Teluk Naga
2
0
0
10
0
0
16
Kebon Cau Kp.Kebon Cau
Teluk Naga
1
0
0
5
0
0
17
Kampung Besar
Teluk Naga
7
0
0
35
0
0
18
Lemo
Teluk Naga
1
0
0
5
0
0
19
Pangkalan Mar
Teluk Naga
1
0
0
5
0
0
20
Tanjung Burung
Teluk Naga
1
0
0
5
0
0
21
Teluk Naga
Teluk Naga
1
0
0
5
0
0
22
Sukamanah
Jambe
0
0
0
0
0
0
23
Jambe
Jambe
1
0
0
5
0
0
24
Ranca Buaya
Jambe
1
0
0
5
0
0
25
Tipar Raya
Jambe
1
0
0
5
0
0
26
Cisauk
Cisauk
0
0
0
0
0
0
27
Caringin
Cisoka
3
0
0
15
0
0
28
Cisoka
Cisoka
4
0
0
20
0
0
29
Cempaka
Cisoka
3
0
0
15
0
0
30
Sukatani Kp.Situgabug
Cisoka
3
0
0
15
0
0
31
Cibugel
Cisoka
1
0
0
5
0
0
32
Cikasungka
Cisoka
1
0
0
5
0
0
33
Jeunjing
Cisoka
1
0
0
5
0
0
34
Kadu Agung
Cisoka
1
0
0
5
0
0
35
Onyam
Gunung Kaler
0
0
0
0
0
0
36
Blukbuk
Kronjo
0
0
0
0
0
0
37
Kedung Dalem
Mauk
1
0
0
5
0
0
38
Banyu Asih
Mauk
1
0
0
5
0
0
39
Jatiwaringin
Mauk
1
0
0
5
0
0
40
Mauk Barat
Mauk
1
0
0
5
0
0
41
Sasak
Mauk
1
0
0
5
0
0
42
Tegal Kunir Kidul
Mauk
2
0
0
10
0
0
43
Kosambi Dalem
Mekar Baru
0
0
0
0
0
0
44
Mekar Baru
Mekar Baru
0
0
0
0
0
0
45
Jambu Karya
Mekar Baru
10
0
0
50
0
0
46
Pasilian
Mekar Baru
1
0
0
5
0
0
47
Ranca Ilat
Mekar Baru
2
0
0
10
0
0
48
Pakuhaji
Pakuhaji
0
0
0
0
0
0
49
Surya Bahari
Pakuhaji
5
0
0
25
0
0
50
Binong Kp.Babakan
Curug
4
0
0
20
0
0
51
Rawa Kidang
Sukadiri
2
0
0
10
0
0
52
Buaran Jati
Sukadiri
2
0
0
10
0
0
53
Karang Serang
Sukadiri
1
0
0
5
0
0
54
Kayu Bongkok
Sukadiri
2
0
0
10
0
0
55
Kosambi
Sukadiri
1
0
0
5
0
0
56
Cikuya
Jayanti
2
0
0
10
0
0
57
Merak
Jayanti
2
0
0
10
0
0
58
Sumur Bandung
Jayanti
2
0
0
10
0
0
59
Klebet
Kemiri
1
0
0
5
0
0
60
Ranca Bango
Kemiri
3
0
0
15
0
0
61
Belimbing
Kosambi
1
0
0
5
0
0
62
Dadap
Kosambi
1
0
0
5
0
0
63
Rawa Burung
Kosambi
2
0
0
10
0
0
64
Selapajang
Kosambi
1
0
0
5
0
0
5 6
Kab. Lebak
Kab.Tangerang
Individual sanitarian
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
28
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Number of Household Get increased Access Household Address
Name of No
City
Number of People Get increased Access to
to Improved Sanitation through Microfinance Improved Sanitation through Microfinance of of FY 2015
Institution Providing Loan
Name of Kelurahan/Village
Name of Sub-district
Des-14
Mar-15
FY 2015
Jun-15
Sep-15
Des-14
Mar-15
Jun-15
Sep-15
Microfinance Supported Improved Sanitation Services 65
Pangadegan
Pasar Kemis
1
0
0
5
0
0
66
Pasar Kemis
Pasar Kemis
1
0
0
5
0
0
67
Sukamantri
Pasar Kemis
1
0
0
5
0
0
68
Daon
Rajeg
5
0
0
25
0
0
69
Mekarsari
Rajeg
2
0
0
10
0
0
70
Sukasari
Rajeg
3
0
0
15
0
0
71
Tanjakan Mekar
Rajeg
8
0
0
40
0
0
72
Gempol Sari
Sepatan
1
0
0
5
0
0
73
Jati Mulya
Sepatan
1
0
0
5
0
0
74
Kelor
Sepatan
1
0
0
5
0
0
75
Pondok Jaya
Sepatan
1
0
0
5
0
0
76
Sangiang
Sepatan
1
0
0
5
0
0
77
Sepatan
Sepatan
3
0
0
15
0
0
78
Sindang Asih
Sindang Jaya
1
0
0
5
0
0
Giri Mekar
Cinunuk
1
0
0
5
0
0
80
Batu Karut
Arjasari
0
2
0
0
10
0
81
Parungserab
Soreang
0
5
0
0
25
0
82
Cileunyi Kulon
Cileunyi
0
5
0
0
25
0
Kedung Galeng
Wonoasih
0
12
2
0
60
10
Kedung Asem
Wonoasih
0
17
6
0
85
30
Wonoasih
Wonoasih
0
9
0
0
45
0
86
Jrebeng Kidul
Wonoasih
0
4
6
0
20
30
87
Pakistaji
Wonoasih
0
0
10
0
0
50
88
Sumber Taman
Wonoasih
0
14
0
0
70
0
89
Kademangan
Kademangan
0
0
14
0
0
70
90
Mangunharjo
Mayangan
0
3
2
0
15
10
91
Mayangan
Mayangan
0
0
8
0
0
40
92
Sukabumi
Mayangan
10
15
14
50
75
70
93
Jati
Mayangan
0
23
5
0
115
25
94
Wiroborang
Mayangan
0
0
3
0
0
15
95
Jrebeng Lor
Kedopok
0
16
14
0
80
70
96
Sumber Wetan
Kedopok
0
0
0
0
0
0
97
Jrebeng Kulon
Kedopok
0
0
2
0
0
10
98
Kanigaran
Kanigaran
0
0
0
0
0
0
99
Kebonsari Wetan
Kanigaran
0
1
6
0
5
30
100
Sukoharjo
Kanigaran
0
0
3
0
0
15
101 Kab.Probolinggo BRI & Individual
Leces
Leces
0
0
1
0
0
5
Sumber Kedawung
Leces
4
10
1
20
50
5
Warujinggo
Leces
0
0
0
0
0
0
104
Kramat
Leces
0
0
0
0
0
0
105
Gading
Leces
0
0
0
0
0
0
106
Rowo
Leces
0
0
0
0
0
0
107
Wonorejo
Maron
0
8
5
0
40
25
108
Brabe
Maron
0
1
0
0
5
0
109
Condong
Maron
0
0
0
0
0
0
110
Kedungsari
Maron
1
1
0
5
5
0
111
Maron Kidul
Maron
0
0
1
0
0
5
112
Maron Kulon
Maron
9
1
5
45
5
25
113
Maron Wetan
Maron
0
1
0
0
5
0
114
Ganting Kulon
Maron
7
0
0
35
0
0
115
Satreyan
Maron
1
0
0
5
0
0
116
Sukoo
Maron
2
2
0
10
10
0
117
Wonorejo
Maron
1
0
0
5
0
0
118
Brumbungan Kidul
Maron
0
5
0
0
25
0
119
Sumberdawe
Maron
0
0
11
0
0
55
120
Ambulu
Sumberasih
0
0
0
0
0
0
121
Mentor
Sumberasih
0
0
0
0
0
0
122
Sumurmati
Sumberasih
0
0
0
0
0
0
123
Jangur
Sumberasih
0
0
0
0
0
0
124
Lemah Kembar
Sumberasih
0
0
0
0
0
0
125
Muneng
Sumberasih
0
0
0
0
0
0
126
Sumberbendo
Sumberasih
0
0
0
0
0
0
127
Banjarsari
Sumberasih
0
0
0
0
0
0
128
Sumber Lele
Kraksaan
0
0
0
0
0
0
129
Jabung Sisir Ds.Bedugul
Paiton
0
0
0
0
0
0
79
Kab.Bandung
Individual sanitarian
B.
East Java
83
Kota Probolinggo BRI, CV Wahana
84
Tirta & Individual
85
102 103
Sanitarian
sanitarian, Sigap Sanitair Corp.
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
29
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Number of Household Get increased Access Household Address
Name of No
City
Number of People Get increased Access to
to Improved Sanitation through Microfinance Improved Sanitation through Microfinance of of FY 2015
Institution Providing Loan
Name of Kelurahan/Village
Name of Sub-district
Des-14
Mar-15
FY 2015
Jun-15
Sep-15
Des-14
Mar-15
Jun-15
Sep-15
Microfinance Supported Improved Sanitation Services 130
Dringu
Dringu
0
9
3
0
45
131
Randuputih
Dringu
0
6
0
0
30
15 0
132
Kalirejo
Dringu
0
0
0
0
0
0
133
Tamansari
Dringu
0
0
0
0
0
0
134
Pesisir
Dringu
0
7
0
0
35
0
135
Krajan
Dringu
0
1
2
0
5
10
136
Pabean
Dringu
0
1
0
0
5
0
137
Kacangan
Dringu
0
1
0
0
5
0
138
Grogol
Dringu
0
2
0
0
10
0
139
Kalisalam
Dringu
0
5
0
0
25
0
140
Bayeman
Tongas
0
0
0
0
0
0
141
Blado Kulon
Tegalsiwalan
0
2
0
0
10
0
142
Bulujalan Lor
Tegalsiwalan
0
2
0
0
10
0
143
Sumberbulu
Tegalsiwalan
0
11
0
0
55
0
144
Banyuanyar Tengah
Banyuanyar
0
0
6
0
0
30
145
Klenang Kidul
Banyuanyar
0
0
7
0
0
35
146
Klenang Lor
Banyuanyar
0
0
1
0
0
5
147
Liprak Wetan
Banyuanyar
0
0
3
0
0
15
148
Tarokan
Banyuanyar
0
0
1
0
0
5
149
Karongbong
Pajarakan
0
0
1
0
0
5
150 Kab. Mojokerto
BRI, CV New Vitex,
Kr. Kedawang
Sooko
0
0
11
0
0
55
151
Individual
Mojoranu
Sooko
0
0
0
0
0
0
Sooko
Sooko
0
0
0
0
0
0
Soko Ds.Ngelo Tengah
Sooko
2
0
0
10
0
0
154
Tempuran
Sooko
0
0
0
0
0
0
155
Jampirogo
Sooko
0
0
0
0
0
0
156
Gemekan Ds.Kedawung
Sooko
2
0
0
10
0
0
157
Japan Ds.Daleman Selatan
Sooko
12
0
0
60
0
0
158
Kedungmaling
Sooko
1
0
0
5
0
0
159
Klinterejo Ds. Beruh
Sooko
0
2
0
0
10
0
160
Klinterejo Ds. Ngenu
Sooko
0
1
0
0
5
0
161
Modongan Ds.Modongan
Sooko
0
1
0
0
5
0
162
Modongan Ds.Tangkil
Sooko
0
5
3
0
25
15
163
Japan
Sooko
0
0
1
0
0
5
164
Ngingas Rembyong
Sooko
0
0
10
0
0
50
165
Bangsal
Bangsal
0
0
0
0
0
0
166
Pucuk
Dawar Blandong
0
0
0
0
0
0
167
Pucuk
Dawar Blandong
0
0
0
0
0
0
168
Banyulegi
Dawar Blandong
0
0
0
0
0
0
169
Pulorejo
Dawar Blandong
0
0
0
0
0
0
170
Sumberwuluh
Dawar Blandong
0
0
0
0
0
0
171
Gunungsari
Dawar Blandong
0
0
0
0
0
0
172
Brayublandong
Dawar Blandong
0
2
2
0
10
10
173
Jelak
Pungging
0
0
0
0
0
0
174
Jiyu
Kutorejo
0
0
0
0
0
0
175
Jotangan
Mojosari
0
0
0
0
0
0
176
Pekukuhan
Mojosari
0
0
6
0
0
30
177
Trowulan
Trowulan
0
0
0
0
0
0
178
Sidoharjo
Gedeg
0
0
0
0
0
0
179
Sidoharjo Ds.Losari Timur
Gedeg
9
0
0
45
0
0
180
Sidoharjo Ds.Tumpak
Gedeg
0
1
0
0
5
0
181
Gembongan
Gedeg
0
0
0
0
0
0
182
Ngimbangan
Gedeg
0
0
0
0
0
0
183
Balongsari Ds.Sidorembuk
Gedeg
0
7
0
0
35
0
184
Gayaman
Mojoanyar
0
0
0
0
0
0
185
Punggul Ds.Jetis
Dlanggu
0
0
0
0
0
0
186
Sukoanyar
Ngoro
0
0
7
0
0
35
Kepuhanyar
65
152 153
Sanitarians, BSM, PNM
187
Puri
0
0
13
0
0
188 Kab. Sidoarjo
Revolving fund under Bareng Krajan
Krian
0
0
0
0
0
0
189
IUWASH Grant
Tempel
Krian
0
0
0
0
0
0
Watugolong
Krian
0
0
0
0
0
0
Tropodo
Krian
0
9
0
0
45
0
Krian
Krian
0
0
0
0
0
0
193
Sidomulyo
Krian
0
0
0
0
0
0
194
Sidorejo
Krian
0
0
0
0
0
0
195
Taman
Krian
0
0
0
0
0
0
196
Prambon
Krian
0
0
0
0
0
0
197
Sidomojo
Krian
0
5
0
0
25
0
198
Jeruk Gamping
Krian
0
0
0
0
0
0
199
Ngares
Sukodono
0
0
10
0
0
50
190 191 192
Program by LPPM ITS, Individual Sanitarians, JM Tiga Srikandi
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
30
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Number of Household Get increased Access Household Address
Name of No
City
Number of People Get increased Access to
to Improved Sanitation through Microfinance Improved Sanitation through Microfinance of of FY 2015
Institution Providing Loan
Name of Kelurahan/Village
Name of Sub-district
Des-14
Mar-15
FY 2015
Jun-15
Sep-15
Des-14
Mar-15
Jun-15
Sep-15
Microfinance Supported Improved Sanitation Services 200
Sambungrejo
Sukodono
0
0
0
0
0
0
201
Jogosatru
Sukodono
0
0
0
0
0
0
202
Bangsri
Sukodono
9
44
0
45
220
0
203
Jemputrejo
Sukodono
0
0
0
0
0
0
204
Kepadangan
Tulangan
0
0
0
0
0
0
205
Janti
Tulangan
0
0
0
0
0
0
206
Waru Mberon
Balong Bendo
0
0
0
0
0
0
207
Wonokupang
Balong Bendo
0
0
0
0
0
0
208
Balongbendo
Balongbendo
0
0
0
0
0
0
209
Jeruklegi
Balongbendo
0
0
0
0
0
0
210
Suwaluh
Balongbendo
0
10
0
0
50
0
211
Candinegoro
Wonoayu
0
0
0
0
0
0
212
Wonokalang
Wonoayu
0
0
0
0
0
0
213
Buduran
Buduran
0
1
0
0
5
0
214
Prambon
Prambon
0
6
0
0
30
0
215
Balunggarut
Krembung
0
0
49
0
0
245
216
Mojoruntut
Krembung
0
0
20
0
0
100
217
Tanjekwagir
Krembung
0
0
13
0
0
65
218 Kab. Jombang
BRI, Bank Jombang,
Kr. Winongan
Mojoagung
0
11
12
0
55
60
219
Koperasi Harapan
Karobelah
Mojoagung
0
0
0
0
0
0
Janti
Mojoagung
0
0
0
0
0
0
Betek
Mojoagung
0
0
0
0
0
0
222
Tanggal Rejo
Mojoagung
0
0
0
0
0
0
223
Dukuh Mojo
Mojoagung
0
0
10
0
0
50
224
Kali Bening
Mojoagung
0
0
0
0
0
0
225
Kedunglumpang
Mojoagung
0
21
5
0
105
25
226
Joho Winongan
Mojoagung
0
8
0
0
40
0
227
Murukan
Mojoagung
0
0
13
0
0
65
228
Plosogeneng
Jombang Kota
0
0
0
0
0
0
229
Banjardowo
Jombang Kota
11
14
2
55
70
10
230
Denanyar
Jombang Kota
0
0
2
0
0
10
231
Pulo Lor
Jombang Kota
0
0
2
0
0
10
232
Sambong Dukuh
Jombang Kota
7
0
0
35
0
0
233
Sengon
Jombang Kota
1
0
4
5
0
20
234
Sumberejo
Jombang Kota
0
0
7
0
0
35
235
Bulurejo
Diwek
0
0
0
0
0
0
236
Jatirejo
Diwek
0
0
0
0
0
0
237
Grogol
Diwek
0
0
0
0
0
0
238
Jatipelem
Diwek
0
0
1
0
0
5
239
Cukir
Diwek
0
0
1
0
0
5
240
Pandan Blale
Ploso
0
0
0
0
0
0
241
Rejoagung
Ploso
0
0
0
0
0
0
242
Bawangan
Ploso
9
8
0
45
40
0
243
Dadi Tunggul
Ploso
0
0
0
0
0
0
244
Tanggung Kramat
Ploso
0
0
0
0
0
0
245
Ploso
Ploso
5
0
0
25
0
0
246
Jatigedong
Ploso
0
5
0
0
25
0
247
Kebonagung
Ploso
0
1
1
0
5
5
248
Gedongombo
Ploso
0
2
0
0
10
0
249
Sepanyul
Gudo
0
6
0
0
30
0
250
Sukoiber
Gudo
0
0
0
0
0
0
251
Bekasur Kadeleman
Gudo
0
11
14
0
55
70
252
Gempul Legundi
Gudo
0
0
0
0
0
0
253
Tanggungan
Gudo
0
2
0
0
10
0
254
Mentaos
Gudo
0
2
2
0
10
10
255
Kedungturi
Gudo
0
0
3
0
0
15
256
Ketanon
Gudo
0
0
1
0
0
5
257
Pucangro
Gudo
0
0
7
0
0
35
258
Plumbon Gambang
Gudo
0
0
3
0
0
15
259
Plandaan
Karangmojo
0
0
0
0
0
0
260
Mojodanu Ds.Mojodanu
Ngusikan
0
0
0
0
0
0
261
Sidokerto
Mojowarno
0
0
9
0
0
45
262
Blawen
Mojowarno
3
0
0
15
0
0
263
Catak Gayam
Mojowarno
7
4
5
35
20
25
264
Menganto Ds.Garut
Mojowarno
3
0
0
15
0
0
265
Latsari
Mojowarno
0
22
0
0
110
0
266
Japanan
Mojowarno
0
5
8
0
25
40
267
Mojojejer
Mojowarno
0
0
22
0
0
110
268
Megaluh
Megaluh
0
0
0
0
0
0
269
Paras Megaluh
Megaluh
1
0
0
5
0
0
220 221
Kesamben & Koperasi Desa
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
31
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Number of Household Get increased Access Household Address
Name of No
City
Number of People Get increased Access to
to Improved Sanitation through Microfinance Improved Sanitation through Microfinance of of FY 2015
Institution Providing Loan
Name of Kelurahan/Village
Name of Sub-district
Des-14
Mar-15
FY 2015
Jun-15
Sep-15
Des-14
Mar-15
Jun-15
Sep-15
Microfinance Supported Improved Sanitation Services 270
Turi Pinggir
Megaluh
11
4
0
55
20
0
271
Gongseng
Megaluh
5
0
0
25
0
0
272
Sumberagung
Megaluh
1
0
0
5
0
0
273
Sumbersari
Megaluh
4
4
0
20
20
0
274
Balongsari
Megaluh
0
6
0
0
30
0
275
Brangkal
Bandar Kedung Mulyo
10
0
5
50
0
25
276
Banjarsari
Bandar Kedung Mulyo
0
2
1
0
10
5
277
Brodot
Bandar Kedung Mulyo
0
6
1
0
30
5
278
Karang Dagangan
Bandar Kedung Mulyo
0
5
4
0
25
20
279
Pucangsimo
Bandar Kedung Mulyo
0
6
1
0
30
5
280
Klaci
Bandar Kedung Mulyo
0
2
0
0
10
0
281
Tinggar
Bandar Kedung Mulyo
0
0
3
0
0
15
282
Kedung Gabus
Bandar Kedung Mulyo
0
0
3
0
0
15
283
Bareng
Bareng
9
0
1
45
0
5
284
Kedungpring
Bareng
1
0
0
5
0
0
285
Mojoanyar
Bareng
5
0
0
25
0
0
286
Banjaragung
Bareng
0
0
1
0
0
5
287
Bongkot
Peterongan
3
0
1
15
0
5
288
Kepuhkembeng
Peterongan
0
5
0
0
25
0
289
Morosunggingan
Peterongan
0
0
1
0
0
5
290
Ngrandulor
Peterongan
0
0
4
0
0
20
291
Bedahlawak
Tembalang
0
1
0
0
5
0
292
Mojokrapak
Tembalang
0
1
0
0
5
0
293
Rejosopinggir
Tembalang
0
0
12
0
0
60
294
Tampingmojo
Tembalang
0
0
1
0
0
5
295
Sumbermulyo
Jogoroto
0
1
1
0
5
5
296
Jarak
Jogoroto
0
0
11
0
0
55
297
Jogoroto
Jogoroto
0
0
1
0
0
5
298
Ngumpul
Jogoroto
0
0
3
0
0
15
299
Sawiji
Jogoroto
0
0
3
0
0
15
300
Tambar
Jogoroto
0
0
1
0
0
5
301
Watugenuk
Ngoro
0
0
1
0
0
5
302
Jatimlerek
Plandaan
0
0
5
0
0
25
303 Kota Surabaya
Revolving fund under Wonokromo
Wonokromo
0
0
0
0
0
0
304
IUWASH Grant
Warugunung
Karangpilang
0
0
0
0
0
0
Karangpilang
Karangpilang
0
0
0
0
0
0
Kedurus
Karangpilang
0
0
0
0
0
0
307
Tenggilis Mejoyo
Tenggilis Mejoyo
0
0
0
0
0
0
308
Kendangsari
Tenggilis Mejoyo
0
0
0
0
0
0
305 306
Program by LPPM ITS, Individual Sanitarians
309 Kab. Lamongan
Hippams Banyu Urip, Bedingin
Sugio
0
4
0
0
20
0
310
Kopdinkes, BRI
Supenuh
Sugio
0
0
0
0
0
0
311
Gondang Lor
Sugio
0
0
0
0
0
0
312
German
Sugio
0
0
0
0
0
0
313
Karang Sambigalih
Sugio
0
4
0
0
20
0
314
Kedung Banjar
Sugio
0
1
0
0
5
0
315
Kedungdadi
Sugio
0
0
13
0
0
65
316
Jubel Kidul
Sugio
0
0
11
0
0
55
317
Mungli
Kalitengah
0
0
0
0
0
0
318
Dlanggu
Deket
0
0
7
0
0
35
319 Kab. Malang
BPSABS Karangsuko, Talangsuko
Turen
0
0
0
0
0
0
320
SME Kube Krisna,
Tumpuk Renteng
Turen
0
0
4
0
0
20 0
321
Individual sanitarian
Karangsuko
Pagelaran
0
0
0
0
0
322
Dau
Dau
0
0
0
0
0
0
323
Putukrejo
Kalipare
0
0
9
0
0
45
324
Pait
Kasembon
0
0
12
0
0
60
325
Karangrejo Selatan
Kromengan
0
0
5
0
0
25
326
Watugede
Singosari
0
0
11
0
0
55
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
32
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Number of Household Get increased Access Household Address
Name of No
City
Number of People Get increased Access to
to Improved Sanitation through Microfinance Improved Sanitation through Microfinance of of FY 2015
Institution Providing Loan
Name of Kelurahan/Village
Name of Sub-district
Des-14
Mar-15
FY 2015
Jun-15
Sep-15
Des-14
Mar-15
Jun-15
Sep-15
Microfinance Supported Improved Sanitation Services 327 Kab. Gresik
Individual sanitarian
Sukodono
Panceng
0
0
0
0
0
0
Pangkah Kulon
Ujung Pangkah
0
0
0
0
0
0
Gunungsari
Bumiaji
0
0
0
0
0
0
330
Bulu Kerto
Bumiaji
0
0
0
0
0
0
331
Pandanrejo
Bumiaji
0
0
0
0
0
0
332
Ngaglik
Batu
0
0
0
0
0
0
333
Torongrejo
Junrejo
0
0
0
0
0
0
334
Junrejo
Junrejo
0
0
0
0
0
0
335
Junrejo
Pendem
0
0
0
0
0
0
0
10
35
328 329 Kota Batu
Individual sanitarian
336 Kota Mojokerto
HAKLI (Himpunan
Pulorejo
Prajuritkulon
0
2
7
337
Ahli Kesehatan
Miji
Prajuritkulon
0
0
6
0
0
30
338
Lingkungan)
Kedundung
Magersari
3
0
3
15
0
15
339
Gedongan
Magersari
0
10
4
0
50
20
340
Jagalan
Magersari
0
0
1
0
0
5 0
C. South Sulawesi/Eastern Indonesia 341 Kab. Jeneponto
Empoang Utara
Binamu
0
8
0
0
40
342
Koppas
Biringkasi
Binamu
0
18
0
0
90
0
343
Pabiringa
Binamu
0
4
0
0
20
0
344
Arungkeke
Arungkeke
0
16
0
0
80
0
345
Bontoramba
Bontoramba
0
0
0
0
0
0
Pallengo
Bangkala
0
0
0
0
0
0
Patallassang
0
0
0
0
0
0
346 347 Kab. Takalar
Koperasi Sukma Jaya Sabintang
348
Palleko
Polut
0
0
0
0
0
0
349
Manongkoki
Polut
0
0
0
0
0
0
350
Malewang
Polut
0
3
0
0
15
0
351
Panranuangku
Polut
0
8
0
0
40
0
Pammase
Tiroang
0
1
0
0
5
0
353
Fakkie
Tiroang
2
0
0
10
0
0
354
Tiroang
Tiroang
0
0
4
0
0
20
355
Marawi
Tiroang
0
0
1
0
0
5
356
Tellumpanua
Suppa
0
0
0
0
0
0
357
Ujung Lero
Suppa
0
2
0
0
10
0
358
Siparappe
Wattang Sawito
0
0
1
0
0
5
359
Sipatokkong
Wattang Sawito
0
0
0
0
0
0
360
Salo
Wattang Sawito
0
2
0
0
10
0
361
Maccorawali
Wattang Sawito
0
1
1
0
5
5
362
Batulappa
Kassa
0
1
0
0
5
0
363
Langnga
Mattiro Sompe
0
4
0
0
20
0
364
Pallameang
Mattiro Sompe
0
0
1
0
0
5
365
Padaidi
Mattiro Bulu
0
5
1
0
25
5
366
Malimpung
Patampanua
0
1
0
0
5
0
367
Tonyamang
Patampanua
0
1
0
0
5
0
368
Lanrisang
Lanrisang
0
0
3
0
0
15
369
Ullusaddang
Lembang
0
0
7
0
0
35
370
Betteng
Lembang
0
0
1
0
0
5
371 Kab.Pare-pare
Koperasi Aneka Jasa Lompoe
Bacukiki
0
11
0
0
55
0
372 Kab.Maros
Koperasi Mitra
Allepolea
Lau
0
0
4
0
0
20
373
Mandiri
352 Kab. Pinrang
Koperasi Denas 66
Maccini Baji
Lau
0
0
9
0
0
45
374
Baju Bodoa
Maros Baru
0
0
3
0
0
15
375
Raya
Turikale
0
0
1
0
0
5
376
Bontoa
Bontoa
0
0
1
0
0
5
377
Tuppabiring
Bontoa
0
0
1
0
0
5
Majjelling Wattang
Maritengngae
0
0
7
0
0
35
379
Lakessi
Maritengngae
0
0
7
0
0
35
380
Uluale
Watang Pulu
0
0
18
0
0
90
381
Bangkai
Watang Pulu
0
0
1
0
0
5
382
Lawowai
Watang Pulu
0
0
1
0
0
5
378 Kab.Sidrap
Koperasi Denas 66
D. Central Java 383 Kota Semarang
Individual sanitarian, Pongangan
Gunungpati
0
0
0
0
0
0
384
Usaha Sanitasi
Pedurungan
0
0
0
0
0
0
316
568
653
1580
2840
3265
Plamongsari
Jamban Sehat Giga
Total Low Income Household Accessing Micro Finance Supported Improved
0
0
Sanitation for each Quarter of this Year Total Low Income Household Accessing Micro Finance Supported Improved Sanitation during this quarter
653
Total Low Income Household Accessing Micro Finance Supported Improved Sanitation up to previous quarter
2.891
To-date achievement of the total Low Income Household Accessing Micro Finance Supported Improved Sanitation
3.544
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
33
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Section 6
TRAINING, WORKSHOP AND SEMINAR ACTIVITIES OF THIRD QUARTER OF FIFTH YEAR (PERIOD OF APRIL – JUNE 2015) Type
Province
Title
Location
Starting Date
End Date Participants % Female Budget (Rp)
Actual Cost Instruction
Trainee
Total
36,49%
3.123.362.464
Kantor Bappeda Bogor 15/01/2015 27/03/2015
13
38,46%
1.820.000
0
1.820.000
0
1.820.000
West
Audiensi Progress Pembentukan UPTD PAL DKPP Kota Tangerang 02/03/2015 02/03/2015
17
41,18%
400.000
0
400.000
0
400.000
Java/Banten/DKI
Kota Tangerang Selatan
Selatan
West
Workshop “Penilaian Asset Risk Matrixs
Soreang
10/03/2015 11/03/2015
18
33,33%
28.450.000
3.917.000
11.400.000
3.800.000
19.117.000
Java/Banten/DKI
dan Pembuatan Dokumen Rencana Adaptasi
Jakarta
Perubahan Iklim Sektor Sumberdaya Air
07/04/2015 07/04/2015
30
26,67%
8.450.000
1.811.000
2.800.000
2.200.000
6.811.000
Kota Bekasi
15/04/2015 15/04/2015
23
34,78%
4.450.000
975.000
1.250.000
2.000.000
4.225.000
Kota Bekasi
28/05/2015 28/05/2015
40
37,50%
9.950.000
1.490.000
2.365.000
5.550.000
9.405.000
West
FGD II Penyusunan Perbup Proteksi Sumber Kab. Serang
12/05/2015 12/05/2015
17
41,18%
8.850.000
0
1.200.000
0
1.200.000
Java/Banten/DKI
Air Baku di Kab. Serang 04/03/2015 04/03/2015
14
28,57%
3.100.000
560.000
1.440.000
450.000
2.450.000
09/03/2015 09/03/2015
16
6,25%
7.650.000
1.206.600
4.800.000
500.000
6.506.600
West
FGD PENYUSUNAN PETA JALAN UPTD
Java/Banten/DKI
AIR LIMBAH DOMESTIK KOTA BOGOR
512.313.438 1.162.057.069
Travel
12.203
665.381.826 2.339.752.333
Jakarta
Jakarta
PDAM Tirta Raharja Kabupaten Bandung”
Focus
West
FGD I Penyusunan Perbup tentang Proteksi Kabupaten Serang
Java/Banten/DKI
Sumber Air Baku di Kab. Serang
Jakarta
Group
West Discussion Java/Banten/DKI
FGD Pembahasan Organisasi UPTD PAL Kota Bekasi
Jakarta West
FGD Pembahasan SOP UPTD PAL Kota
Java/Banten/DKI
Bekasi
Jakarta
Jakarta Central Java
FGD PERENCANAAN PENGEMBANGAN @ Hom Hotel CEM KABUPATEN KUDUS
Central Java
Diskusi Terfokus Advokasi Peningkatan
Hotel Grand Tjokro,
Layanan Air Minum dan Sanitasi Kepada
Klaten
DPRD Kabupaten Klaten
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
34
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Title
Province Central Java
Central Java
Location
FGD Penyampaian Progress Program-
Hotel Lor Inn - jl. Adi
program Yang Mendukung SL2T2 Kota
Sucipto no.47 - Kota
Surakarta
Surakarta
Starting Date
End Date Participants % Female Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
11/03/2015 11/03/2015
17
11,76%
4.000.000
900.000
2.400.000
600.000
3.900.000
19/03/2015 19/03/2015
19
31,58%
3.530.000
800.000
1.440.000
800.000
3.040.000
RM Kebon Djati
20/03/2015 20/03/2015
22
45,45%
1.000.000
0
1.000.000
0
1.000.000
RM KafeOle Salatiga
23/03/2015 23/03/2015
9
22,22%
900.000
0
735.000
0
735.000
Focus Group Discussion Kedua Legal
Kantor Sekda
25/03/2015 25/03/2015
20
25,00%
1.650.000
682.400
660.000
0
1.342.400
Drafting Draft Final Perbup Pedoman
Kabupaten Sukoharjo
FGD PENGEMBANGAN REGULASI CEM 1 @ Hom Hotel , KABUPATEN KUDUS
Central Java
FGD Pengisian Matrix PDAM Performance Index PDAM Kabupaten Rembang
Central Java
FGD Pengisian Matrix PDAM Index PDAM Kab. Semarang & PDAM Kota Salatiga
Central Java
Penyelenggaraan Pengelolaan Pengaduan Masyarakat Kabupaten Sukoharjo
Focus Group
Central Java
Discussion
FGD REVIEW BISNIS PLAN PDAM
Balemong Resort
30/03/2015 30/03/2015
10
20,00%
2.000.000
500.000
1.500.000
0
2.000.000
KABUPATEN SEMARANG
Ungaran
FGD Pembiayaan Sambungan Baru Skema
Rumah Makan Trio G - 02/04/2015 02/04/2015
22
22,73%
4.080.000
150.000
1.920.000
1.050.000
3.120.000
Kredit Mikro Kerjasama PDAM Rembang -
Sarang Rembang 06/04/2015 06/04/2015
7
14,29%
2.650.000
700.000
1.500.000
350.000
2.550.000
10/04/2015 10/04/2015
5
0,00%
2.140.000
1.050.000
383.000
150.000
1.583.000
- cont' Central Java
PNPM Perdesaan untuk Wilayah Kecamatan Central Java
FGD Revisi Perwal UPT TPA Kota Salatiga
Kaafe Olie Kota Salatiga
Central Java
FGD Perencanaan Launching CEM "Watsan RM Banyu Mili Klaten on The Radio Dialogue"
(tentatif)
Central Java
FGD Review Business Plan PDAM Salatiga
RM Kafeole Salatiga
14/04/2015 14/04/2015
8
0,00%
1.000.000
0
778.000
0
778.000
Central Java
FGD Penguatan Kapasitas Pengelola Radio
Radio RSPD
15/04/2015 15/04/2015
26
38,46%
2.850.000
1.300.000
747.500
225.000
2.272.500
RSPD Kab Klaten
KAbupaten Klaten, Jalan Pemuda Klaten
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
35
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province Central Java
Title
Location
FGD Sinkronisasi Rencana Kerja Program
Hotel Kusuma Sahid
SL2T2 Kota Surakarta
Palace Hotel (KSPH),
Starting Date
End Date Participants % Female Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
29/04/2015 29/04/2015
18
22,22%
2.650.000
0
2.500.000
450.000
2.950.000
30/04/2015 30/04/2015
12
25,00%
3.000.000
900.000
663.000
600.000
2.163.000
Surakarta Central Java
Central Java
FGD Tindak Lanjut Revisi Perwal UPTD TPA RM Joglo Penjawi Salatiga
Salatiga
FGD Finalisasi Draf SK Walikota tentang
Hotel Solo Paragon
08/05/2015 08/05/2015
10
30,00%
4.450.000
600.000
3.000.000
450.000
4.050.000
FGD Partisipatif Penajaman Road Map
KSPH - Kusuma Sahid
11/05/2015 15/06/2015
10
40,00%
8.500.000
400.000
2.100.000
450.000
2.950.000
Pengelolaan Air Limbah Domestik Kota
Prince Hotel, Kota
Surakarta
Surakarta
Diskusi Nasional Advokasi Anggaran Untuk
Hotel AKMANI, , Jl.
12/05/2015 12/05/2015
1
100,00%
4.550.000
750.000
1.300.000
1.175.000
3.225.000
Sanitasi
KH. Wahid Hasyim Resto Merapi
13/05/2015 13/05/2015
7
0,00%
2.300.000
650.000
708.400
1.025.000
2.383.400
Hotel Solo paragon
18/05/2015 18/05/2015
53
3,77%
12.600.000
850.000
9.000.000
2.450.000
12.300.000
Diskusi Implementasi P3M sebagai Ruang
Hotel DAFAM, Jalan
19/05/2015 19/05/2015
46
30,43%
12.000.000
2.456.250
6.000.000
2.100.000
10.556.250
Pengaduan Masyarakat Isu Air Bersih dan
Imam Bonjol No 188
Sanitasi
Semarang
Evaluasi ‘Program Hibah’ Jawa Tengah
Kantor IUWASH Jawa 19/05/2015 21/05/2015
10
70,00%
14.528.000
2.400.000
4.706.850
4.013.000
11.119.850
Bersama 2 Lembaga (PT. SCM Tirta Utama
Tengah
Tarif Air Limbah dan SL2T2 Kota Surakarta Central Java
Central Java
No.91, Jakarta Pusat, Focus
Central Java
ADVOKASI ANGGARAN SANITASI OPTIMALISASI SR PROGRAM KOMUNAL
Group
MENDUKUNG PROGRAM LAYANAN
Discussin
SANITASI KABUPATEN KLATEN
(cont') Central Java
FGD Pembahasan Reklasifikasi Pelanggan PDAM Surakarta
Central Java
Central Java
dan Gita Pertiwi) Central Java
FGD Finalisasi Review Business Plan PDAM
RM Kafeole Salatiga
21/05/2015 21/05/2015
6
0,00%
1.000.000
0
716.000
0
716.000
Hotel Indah Palace
22/05/2015 22/05/2015
12
25,00%
3.500.000
650.000
2.000.000
500.000
3.150.000
Salatiga Central Java
Perencanaan Peresmian (Launching) Pengelolaan Pengaduan Masyarakat (CEM) Kabupaten Sukoharjo
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
36
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province
Title
End Date Participants % Female Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
10
50,00%
1.450.000
600.000
199.000
75.000
874.000
Jomblang
06/11/2013 06/11/2013
6
66,67%
1.200.000
0
400.000
0
400.000
Monev Pelaksanaan Progran Hibah Septic
Sekretariat Gita
30/12/2013 30/12/2013
29
62,07%
250.000
0
300.000
0
300.000
Tank Komunal
Pertiwi Jomblang
Pemetaan dan Pembentukan KSM
Sekretariat Gita
10/01/2014 10/01/2014
27
59,26%
1.025.000
25.000
300.000
0
325.000
31/03/2014 31/03/2014
21
47,62%
250.000
0
200.000
0
200.000
01/04/2014 01/04/2014
8
62,50%
900.000
0
100.000
0
100.000
12/04/2014 12/04/2014
11
63,64%
900.000
100.000
823.000
0
923.000
31/05/2014 31/05/2014
21
47,62%
250.000
0
300.000
0
300.000
12/06/2014 12/06/2014
17
58,82%
900.000
100.500
250.000
0
350.500
30/06/2014 30/06/2014
22
50,00%
250.000
0
300.000
0
300.000
18/08/2014 18/08/2014
12
58,33%
900.000
0
250.000
0
250.000
22/09/2014 22/09/2014
15
46,67%
1.612.500
693.000
1.057.500
400.000
2.150.500
28/10/2014 28/10/2014
16
43,75%
1.612.500
1.108.000
1.150.000
350.000
2.608.000
06/11/2014 06/11/2014
21
57,14%
900.000
0
800.000
0
800.000
21/11/2014 21/11/2014
19
57,89%
1.612.500
0
220.000
0
220.000
05/01/2015 05/01/2015
18
33,33%
1.612.500
903.200
1.055.000
250.000
2.208.200
12/06/2014 12/06/2014
29
44,83%
4.650.000
150.000
1.750.000
2.000.000
3.900.000
13/06/2014 13/06/2014
29
31,03%
5.950.000
0
2.986.000
2.450.000
5.436.000
PERTIWI (Grantee)
Rumah Tangga
Central Java-GITA
Assesment Pemetaan Jaringan Perpipaan
PERTIWI (Grantee)
(Pengukuran)
Central Java-GITA PERTIWI (Grantee) Central Java-GITA
Pertiwi Jomblang
Central Java-GITA
Monev Pelaksanaan Program Hibah Septic
Sekretariat Gita
PERTIWI (Grantee)
Tank Jomblang
Pertiwi Jomblang
Central Java-GITA
Forum Pendampingan KSM Sehat Lestari
Sekretariat Gita
PERTIWI (Grantee)
Pertiwi Jomblang Forum Pendampingan KSM Sehat Lestari
PERTIWI (Grantee)
Sekretariat Gita Pertiwi Jomblang
Central Java-GITA
Monev Pelaksanaan Program Hibah Septic
Sekretariat Gita
PERTIWI (Grantee)
Tank Komunal di Jomblang
Pertiwi Jomblang
Central Java-GITA
Forum Pendampingan KSM Sehat Lestari
Sekretariat Gita
PERTIWI (Grantee)
Group Central Java-GITA Discussin PERTIWI (Grantee) (cont') Central Java-GITA
Date
05/11/2013 05/11/2013
Assesment Pemetaan Lokasi Sambungan
Central Java-GITA
Starting
Jomblang, Semarang
Central Java-GITA
PERTIWI (Grantee)
Focus
Location
Pertiwi Jomblang Monev Pelaksanaan Program Hibah Septic
Sekretariat Gita
Tank Komunal
Pertiwi Semarang
Forum Pendampingan KSM Sehat Lestari
Sekretariat Gita
PERTIWI (Grantee)
Pertiwi Jomblang
Central Java-GITA
Forum Stakeholder Program Hibah Septic
Sekretariat Gita
PERTIWI (Grantee)
Tank Komunal
Pertiwi Jomblang
Central Java-GITA
Forum Stakeholder Pelaksanaan Program
Sekretariat Gita
PERTIWI (Grantee)
Hibah Septic Tank Komunal
Pertiwi Jomblang
Central Java-GITA
Forum Pendampingan KSM Sehat Lestari
Sekretariat Gita
PERTIWI (Grantee)
Pertiwi Jomblang
Central Java-GITA
Forum Stakeholder Program Hibah Septic
Sekretariat Gita
PERTIWI (Grantee)
Tank Komunal
Pertiwi Jomblang
Central Java-GITA
Forum Stakeholder Program Hibah Septic
Sekretariat Gita
PERTIWI (Grantee)
Tank Komunal
Pertiwi Jomblang
Central Java-
Kick Off Meeting Untuk Launcging dan
Hotel The Margangsa
SPEKHAM (Grantee) Sosialisasi Projek
Surakarta
Central Java-
Hotel Dalu Semarang
Kick Off Meeting untuk Launching dan
SPEKHAM (Grantee) Sosialisasi Program
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
37
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province Central Java-
Title Pendampingan KPP/KSM Untuk Melakukan
Location Mangunharjo, Kota
Starting Date
End Date Participants % Female Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
06/12/2014 06/12/2014
25
0,00%
225.000
150.000
0
0
150.000
06/12/2014 06/12/2014
21
0,00%
225.000
150.000
0
0
150.000
Gondosari, Kudus
11/12/2014 11/12/2014
31
64,52%
225.000
150.000
0
0
150.000
Banget, Kudus
20/12/2014 20/12/2014
30
53,33%
225.000
150.000
0
0
150.000
Setrokalangan,
21/12/2014 21/12/2014
30
100,00%
225.000
150.000
0
0
150.000
Papringan, Semarang
02/01/2015 02/01/2015
30
40,00%
225.000
150.000
0
0
150.000
Ngerangan Bayat,
03/01/2015 03/01/2015
15
20,00%
225.000
150.000
0
0
150.000
03/01/2015 03/01/2015
27
14,81%
225.000
150.000
0
0
150.000
Jerakah, Semarang
04/01/2015 04/01/2015
24
0,00%
225.000
150.000
0
0
150.000
Mutihan, Sondakan,
SPEKHAM (Grantee) Penyambungan SR di Mangunharjo, Semarang Semarang
Central Java-
Pendampingan KPP/KSM Untuk Melakukan
Kendeng Getasan
SPEKHAM (Grantee) Penyambungan SR di Getasan Gebog, Kudus Gebog, Kudus Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Gondosari, Kudus Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Banget, Kudus Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Setrokalangan,
Semarang
Semarang Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Papringan, Semarang Focus Group
Central JavaPendampingan KPP/KSM Untuk Melakukan Discussin SPEKHAM (Grantee) Penyambungan SR di Ngerangan Bayat (cont') Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Palir Padarejo,
Klaten Palir Pondorejo, Semarang
Semarang Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Jerakah, Semarang Central Java-
05/01/2015 05/01/2015
36
8,33%
225.000
150.000
0
0
150.000
SPEKHAM (Grantee) Penyambungan SR
Pendampingan KPP/KSM Untuk Melakukan
Laweyan, Surakarta
Central Java-
Singopuran, Sukoharjo 11/01/2015 11/01/2015
13
0,00%
225.000
150.000
0
0
150.000
Karangasem Laweyan,
25/01/2015 25/01/2015
25
8,00%
225.000
150.000
0
0
150.000
31/01/2015 31/01/2015
17
0,00%
225.000
150.000
0
0
150.000
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Singopuran Sukoharjo Central Java-
Pendampingan KSM/KPP Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR
Surakarta
Central Java-
Poganga, Semarang
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Pogangan Semarang
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
38
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province Central Java-
Title Pendampingan KPP/KSM Untuk Melakukan
Location Mangunharjo,
Starting Date
End Date Participants % Female Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
31/01/2015 31/01/2015
23
0,00%
225.000
150.000
0
0
150.000
03/02/2015 03/02/2015
18
33,33%
225.000
150.000
0
0
150.000
Cepoko, Semarang
03/02/2015 03/02/2015
22
31,82%
225.000
150.000
0
0
150.000
Ngembalrejo, Kudus
05/02/2015 05/02/2015
27
14,81%
225.000
150.000
0
0
150.000
Mranggen Delanggu,
SPEKHAM (Grantee) Penyambungan SR di Mangunharjo, Semarang Semarang
Central Java-
Pendampingan KPP/KSM Untuk Melakukan Keprabon Banjarsari,
SPEKHAM (Grantee) Penyambungan SR di Keprabon Banjarsari
Surakarta
Surakarta Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Cepoko, Semarang Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Ngambal Rejo, Kudus Central Java-
Focus Group Discussion (cont')
11/02/2015 11/02/2015
29
24,14%
225.000
150.000
0
0
150.000
SPEKHAM (Grantee) Penyambungan SR di Delanggu Klaten
Pendampingan KPP/KSM Untuk Melakukan
Klaten
Central Java-
Balong, Trunuh, Klaten 15/02/2015 15/02/2015
19
57,89%
225.000
150.000
0
0
150.000
Singopuran, Sukoharjo 15/02/2015 15/02/2015
12
25,00%
225.000
150.000
0
0
150.000
Soropadan
16/02/2015 16/02/2015
57
100,00%
225.000
150.000
0
0
150.000
Kalipancur, Semarang
19/02/2015 19/02/2015
14
14,29%
225.000
150.000
0
0
150.000
Karangasem Laweyan,
22/02/2015 22/02/2015
42
0,00%
225.000
150.000
0
0
150.000
22/02/2015 22/02/2015
14
28,57%
225.000
150.000
0
0
150.000
24/02/2015 24/02/2015
6
0,00%
225.000
150.000
0
0
150.000
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Klaten Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Sukoharjo Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Soropadan Karangasem, Karangasem, Surakarta Surakarta Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Kalipancur, Semarang Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR Di Karangasem, Laweyan
Surakarta
Central Java-
Purbayan Singopuran,
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Singopuran, Sukoharjo Sukoharjo Central Java-
Pendampingan KPP/KSM Untuk Melakukan
Purbayan Singopuran,
SPEKHAM (Grantee) Penyambungan SR di Ngerangan Bayat Klaten Sukoharjo
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
39
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Title
Province Central Java-
Pendampingan KPP/KSM Untuk Melakukan
Location
Starting Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
Gajahan, Surakarta
27/02/2015
27/02/2015
16
18,75%
225.000
150.000
0
0
150.000
Tapen Sumber,
28/02/2015
28/02/2015
24
20,83%
225.000
150.000
0
0
150.000
Jerakah, Semarang
01/03/2015
01/03/2015
25
0,00%
225.000
150.000
0
0
150.000
Palir Podorejo,
01/03/2015
01/03/2015
6
33,33%
225.000
150.000
0
0
150.000
02/03/2015
02/03/2015
18
5,56%
225.000
150.000
0
0
150.000
Ngijo, Semarang
03/03/2015
03/03/2015
15
0,00%
225.000
150.000
0
0
150.000
Sumber, Surakarta
05/03/2015
05/03/2015
11
45,45%
225.000
150.000
0
0
150.000
Pogangan, Semarang
06/03/2015
06/03/2015
22
45,45%
225.000
150.000
0
0
150.000
Plalangan, Semarang
07/03/2015
07/03/2015
20
10,00%
225.000
150.000
0
0
150.000
Mangunharjo,
07/03/2015
07/03/2015
34
0,00%
225.000
150.000
0
0
150.000
Besito, Kudus
08/03/2015
08/03/2015
18
5,56%
225.000
150.000
0
0
150.000
Gumulan, Klaten
08/03/2015
08/03/2015
22
36,36%
225.000
150.000
0
0
150.000
Kampung Baru,
11/03/2015
11/03/2015
15
0,00%
225.000
150.000
0
0
150.000
14/03/2015
14/03/2015
35
0,00%
225.000
150.000
0
0
150.000
SPEKHAM (Grantee) Penyambungan SR di Gajahan, Surakarta Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Tapen Sumber,
Surakarta
Surakarta Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR diJerakah, Semarang Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Palir Podorejo,
Semarang
Semarang Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Palir Podorejo,
Palir Podorejo, Semarang
Semarang Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Ngijo, Semarang Central JavaFocus
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Sumber, Surakarta
Group Discussion Central JavaPendampingan KPP/KSM Untuk Melakukan (cont') SPEKHAM (Grantee) Penyambungan SR di Pogangan, Semarang Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Plalangan, Semarang Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Mangunharjo, Semarang Semarang Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Besito, Kudus Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Gumulan Klaten Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Kampung Baru,
Surakarta
Surakarta Central Java-
Pendampingan KPP/KSM Untuk Melakukan
Mnagunharjo,
SPEKHAM (Grantee) Penyambungan SR di Mangunharjo, Semarang Semarang
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
40
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province Central Java-
Title Pendampingan KPP/KSM Untuk Melakukan
Location
Starting Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
Singopuran, Sukoharjo 14/03/2015
14/03/2015
20
10,00%
225.000
150.000
0
0
150.000
Gumulan, Klaten
15/03/2015
15/03/2015
8
0,00%
225.000
150.000
0
0
150.000
Mranggen Delanggu,
15/03/2015
15/03/2015
9
44,44%
225.000
150.000
0
0
150.000
SPEKHAM (Grantee) Penyambungan SR di Singopuran, Sukoharjo Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Gumulan Klaten Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Delanggu Klaten
Klaten
Central Java-
Gajahan, Surakarta
16/03/2015
16/03/2015
36
97,22%
225.000
150.000
0
0
150.000
Jetis Cepoko,
16/03/2015
16/03/2015
16
12,50%
225.000
150.000
0
0
150.000
Pajang, Surakarta
17/03/2015
17/03/2015
31
100,00%
225.000
150.000
0
0
150.000
Bayat, Klaten
20/03/2015
20/03/2015
15
33,33%
225.000
150.000
0
0
150.000
Bentakan, Sukoharjo
21/03/2015
21/03/2015
13
38,46%
225.000
150.000
0
0
150.000
Kesambi, Kudus
22/03/2015
22/03/2015
27
0,00%
225.000
150.000
0
0
150.000
Mancasan Sukoharjo
22/03/2015
22/03/2015
21
9,52%
225.000
150.000
0
0
150.000
Cepoko, Semarang
22/03/2015
22/03/2015
9
22,22%
225.000
150.000
0
0
150.000
Cepoko, Semarang
22/03/2015
22/03/2015
11
27,27%
225.000
150.000
0
0
150.000
Kalipancur, Semarang
22/03/2015
22/03/2015
9
22,22%
225.000
150.000
0
0
150.000
Jetis, Semarang
25/03/2015
25/03/2015
15
100,00%
225.000
150.000
0
0
150.000
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Gejahan Surakarta Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Jetis Cepoko, Semarang Semarang Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Pajang, Surakarta Central JavaFocus
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Bayat Klaten
Group Discussion Central JavaPendampingan KPP/KSM Untuk Melakukan (cont') SPEKHAM (Grantee) Penyambungan SR di Bentakan Sukoharjo Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Kesambi, Kudus Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Mancasan, Sukoharjo Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Cepoko, Semarang Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Cepoko, Semarang Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Kalipancur, Semarang Central Java-
Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Jetis, Semarang
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
41
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province Central Java-
Title Pendampingan KPP/KSM Untuk Melakukan
SPEKHAM (Grantee) Penyambungan SR di Kampung Baru
Location Kampung Baru,
Starting Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
31/03/2015
31/03/2015
18
22,22%
225.000
150.000
0
0
150.000
04/03/2015
04/03/2015
14
14,29%
4.640.000
107.000
1.880.000
900.000
2.887.000
Surakarta
Surakarta East Java
FGD Penyempurnaan Roadmap Pengelolaan
Ruang Pertemuan RM
Air Limbah Domestik Kota Probolinggo
ORIN, Kota Probolinggo
East Java
East Java
East Java
FGD dan Monitoring IPAL Komunal di Kota RM Orin, Jl. Panjaitan
05/03/2015
09/03/2015
19
31,58%
11.730.000
2.043.000
2.430.000
4.050.000
8.523.000
Probolinggo
no. 1A, Probolinggo.
FGD pembahasan Ranperbup Perlindungan
Ruang Rapat Satya Bina 13/03/2015
13/03/2015
13
23,08%
3.100.000
1.000.000
753.000
750.000
2.503.000
dan Penambahan Debit Mata Air melalui
Karya
Sumur Resapan Kabupaten Mojokerto
Jl. A. Yani Mojokerto
FGD Finalisasi Perbup Pengelolaan Sumur
Ruang Rapat Satya Bina 20/03/2015
20/03/2015
15
33,33%
3.130.000
1.081.800
909.800
975.000
2.966.600
Resapan Kabupaten Mojokerto
Karya 06/04/2015
06/04/2015
24
29,17%
6.300.000
875.300
1.601.600
1.800.000
4.276.900
07/04/2015
07/04/2015
19
5,26%
6.800.000
200.000
3.217.300
1.425.000
4.842.300
09/04/2015
09/04/2015
21
47,62%
4.000.000
104.000
1.200.000
0
1.304.000
09/04/2015
09/04/2015
47
23,40%
10.055.000
952.000
3.434.000
3.150.000
7.536.000
16/04/2015
16/04/2015
20
15,00%
9.213.000
2.501.000
5.200.000
1.350.000
9.051.000
27/04/2015
28/04/2015
39
35,90%
17.625.000
1.465.500
9.096.000
5.325.000
15.886.500
08/05/2015
08/05/2015
24
41,67%
5.625.000
987.500
2.067.200
1.800.000
4.854.700
12/05/2015
13/05/2015
38
31,58%
19.880.000
1.444.000
11.950.000
5.325.000
18.719.000
Jl. A. Yani Mojokerto East Java
Workshop Kesepakatan dengan Pokja AMPL Ruang meeting Rumah untuk Program CEM di Radio 98,6 Wika FM Makan Jimbaran dibidang Air Minum dan Sanitasi Kabupaten Jl. By Pass 48 Km
Focus Group
East Java
Discussion (cont')
East Java
East Java
East Java
Mojokerto Provinsi Jawa Timur
Mojokerto
FGD Identifikasi Kebutuhan Pendampingan
Rm Warung Legend,
UPTD PAL Kabupaten Gresik
Gresik
FGD Pembahasan Penyelesaian Roadmap
RM. Zam-Zam
Sanitasi dan UPTD Kabupaten Jombang,
Jl. Raya Ceweng No.46
Provinsi Jawa Timur
Diwek Jombang
FGD Promosi Sanitasi Sistem Individu
RM Orin, Jl. Panjaitan
Kepada BKM Kota Probolinggo
no. 1A, Probolinggo.
Focus Group Discustion (FGD) RanperWal Ruang Meeting Klub Konservasi Sumber Daya Air Kota Batu,
Bunga Kota Batu
Provinsi Jawa Timur East Java
FGD Promosi IPAL Komunal Kepada
Hotel Filadelfia, Jl.
Sanitarian di Kota Batu
Bukit Berbunga no. 46, Kota Batu
East Java
Finalisasi Jadwal Siaran Program Air Minum
: RM. Majatama
dan Sanitasi Melalui Media CEM Di Radio
Jl. A. Yani Mojokerto
98,6 Wika FM Kabupaten Mojokerto Provinsi Jawa Timur East Java
FGD Promosi IPAL Komunal kepada
Hotel Montana, Jl.
Sanitarian Kota Malang
Kahuripan, Malang
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
42
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province East Java
Title
Location
Focus Group Disscussion Finalisasi Program Meeting Room Hotel
Starting Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
13/05/2015 13/05/2015
13
15,38%
5.924.000
775.000
2.606.000
825.000
4.206.000
FGD Penguatan KPP dalam Pengelolaan IPAL Hotel Sahid Montana, 19/05/2015 19/05/2015
36
27,78%
10.825.000
844.000
0
2.400.000
3.244.000
20/05/2015 20/05/2015
16
37,50%
4.610.000
2.281.700
740.000
975.000
3.996.700
22/05/2015 22/05/2015
33
27,27%
10.135.000
1.149.000
0
2.325.000
3.474.000
26/05/2015 26/05/2015
29
6,90%
10.428.000
2.101.000
3.060.000
1.875.000
7.036.000
16/12/2014 17/12/2014
68
61,76%
10.005.000
2.770.000
2.409.000
3.200.000
8.379.000
02/03/2015 03/03/2015
100
62,00%
6.700.000
1.240.000
3.090.000
1.650.000
5.980.000
05/03/2015 13/03/2015
10
70,00%
2.550.000
943.000
353.000
700.000
1.996.000
10/03/2015 10/03/2015
42
85,71%
14.775.000
5.085.000
1.675.000
3.900.000
10.660.000
11/03/2015 11/03/2015
50
76,00%
8.612.500
3.084.000
2.035.000
1.450.000
6.569.000
Siaran Bidang Air Minum dan Sanitasi
Alliya
Jl.
Melalui Media Lokal Radio Bromo FM
Mayjen Sutoyo No.
Bersama SKPD Kab Probolinggo
115 Kraksaan – Kabupaten Probolinggo
East Java
Komunal di Kota Malang
Jl. Kahuripan, Kota Malang
East Java
Focus Group Discussion (FGD) Pembahasan Ruang Rapat Ranperwal PSDA Kota Batu, Provinsi Jawa
Sekretariat Daerah
Timur
Kota Batu Jl. Panglima Sudirman Kota Batu.
East Java
FGD Penguatan KPP dalam Pengelolaan IPAL Hotel Filadelfia, Jl. Komunal di Kota Batu
Bukit Berbungan no 46, Kota Batu
Focus
East Java
Focus Group Discustion (FGD) RanperBup Ruang Pertemuan Pengelolaan Sumber Daya Air (PSAD) Sumur Hotel Alliya.
Group
Resapan dan Biopori Kabupaten Probolinggo, Jl. Mayjen Sutoyo, No.
Discussion
Provinsi Jawa Timur
(cont')
115, Kraksaan, Probolinggo.
South
Promosi Pemasaran Mikro Finance Sarana
Kelurahan Lakessi dan
Sulawesi/Eastern
Sanitasi Jamban Jamban Bagi Masyarakat
Kelurahan Majjelling
Indonesia
Berpenghasilan Rendah (MBR) di Kabupaten Wattang Sidrap
South
Promosi & Pemasaran Kredit Jamban Sehat
Kelurahan Padaidi &
Sulawesi/Eastern
oleh Koperasi Denas 66 dengan Masyarakat
Kelurahan Tiroang
Indonesia
di Kabupaten Pinrang
South
Diskusi Pendalaman dan Penyempurnaan
Sulawesi/Eastern
Draft Ranperda Pengelolaan Air Limbah
Kota Makassar
Indonesia
Domestik Kota Makassar
South
Sosialisasi Mekanisme dan Harga Baru Jamban Aula Panti Asuhan
Sulawesi/Eastern
Sehat kepada kader & Sanitarian oleh KSU
Indonesia
Denas 66 untuk 13 Puskesmas di Kabupaten Pangkajenne
Muhammadiyah-
Sidrap South
Promosi & Pemasaran Kredit Jamban Sehat
Kantor Kelurahan
Sulawesi/Eastern
oleh Koperasi Denas 66 dengan Masyarakat
Lanrisang
Indonesia
Kelurahan Lanrisang di Kabupaten Pinrang
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
43
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province
Title
Location
South
Promosi & Pemasaran Kredit Jamban Sehat
Kelurahan Benteng,
Sulawesi/Eastern
oleh Koperasi Denas 66 dengan Masyarakat
Kelurahan Betteng,
Indonesia
di Lima Kelurahan - Kabupaten Pinrang
Kelurahan Ulu
Starting Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
17/03/2015
19/03/2015
211
51,18%
17.950.000
1.718.000
8.000.000
3.650.000
13.368.000
Kab. Maros
02/04/2015
02/04/2015
14
64,29%
3.350.000
325.000
765.000
1.300.000
2.390.000
Kota Parepare
07/04/2015
07/04/2015
18
27,78%
3.700.000
1.000.000
937.500
1.600.000
3.537.500
Takalar
08/04/2015
08/04/2015
22
22,73%
3.700.000
800.000
1.100.000
1.500.000
3.400.000
09/04/2015
13
23,08%
3.100.000
750.000
777.600
850.000
2.377.600
10/04/2015
14
50,00%
2.600.000
200.000
208.000
1.300.000
1.708.000
20/04/2015
23/04/2015
228
65,35%
19.725.000
4.595.000
2.800.000
4.600.000
11.995.000
22/04/2015
22/04/2015
19
52,63%
3.205.000
350.000
1.080.000
1.425.000
2.855.000
Saddang Kelurahan Pacongang, dan Kelurahan Maminasa’e South
FGD PEMECAHAN PERMASALAHAN
Sulawesi/Eastern
DALAM PERCEPATAN SKEMA KREDIT
Indonesia
MIKRO SAMBUNGAN AIR (KMSA) PDAM KABUPATEN MAROS dan BMT. AL. AZHAR
South
FGD Monitoring Citizen Engagement
Sulawesi/Eastern
Mechanism (CEM) di Kota Parepare
Indonesia South
FGD Monitoring Citizen Engagement
Sulawesi/Eastern
Mechanism (CEM) di Kabupaten Takalar
Indonesia
Focus Group Discussion (cont')
South
FGD Sosialisasi Pembuatan GIS untuk
Ruang Rapat Balai Kota 09/04/2015
Sulawesi/Eastern
Pengumpulan Data Konsulmen UPTD PAL
Jayapura
Indonesia
Kota Jayapura
South
FGD Tim Prosinta Persiapan ToT Kader dan Kantor IUWASH Kota 10/04/2015
Sulawesi/Eastern
Sanitarian program sAIIG Kota Makassar
Makassar
South
Promosi & Pemasaran Kredit Jamban Sehat
Kelurahan Cipotakari,
Sulawesi/Eastern
oleh KSU Denas 66 dengan Masyarakat di
Kelurahan Bulo
Indonesia
Empat Puskesmas - Kabupaten Sidrap
Wattang, Kelurahan
Indonesia
Toddang Pulu, Kelurahan Massepe, Kelurahan Rijang Pittu, Kelurahan Lautang Benteng, Kelurahan Manisa, dan Kelurahan Benteng South
FGD Tim Sanrima Persiapan ToT Kader dan Ruang Rapat Kantor
Sulawesi/Eastern
Sanitarian program sAIIG Kab. Maros
Bupati Maros
South
Promosi & Pemasaran Kredit Jamban Sehat
Kelurahan Kassa
24/04/2015
24/04/2015
40
77,50%
4.275.000
300.000
1.850.000
750.000
2.900.000
Sulawesi/Eastern
oleh KSU Denas 66 dengan Masyarakat di Jeneponto
06/05/2015
06/05/2015
16
31,25%
3.325.000
300.000
750.000
1.400.000
2.450.000
Indonesia
Indonesia
Kelurahan Kassa – Pinrang
South
FGD Penyempurnaan Feedback Mechanism
Sulawesi/Eastern
(CEM) untuk Pelayanan Publik di Kabupaten
Indonesia
Jeneponto
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
44
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Title
Province South
FGD Lanjutan Citizen Engagement
Sulawesi/Eastern
Mechanism di Kabupaten Bantaeng
Location
Starting Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
Kab. Bantaeng
07/05/2015
07/05/2015
17
41,18%
3.325.000
550.000
675.000
1.300.000
2.525.000
08/05/2015
11/05/2015
147
66,67%
9.425.000
1.034.000
1.422.500
5.375.000
7.831.500
10/05/2015
25
84,00%
2.550.000
519.500
800.000
400.000
1.719.500
11/05/2015
18/05/2015
98
57,14%
16.325.000
2.475.000
1.400.000
1.700.000
5.575.000
13/05/2015
13/05/2015
69
56,52%
7.900.000
3.804.000
2.450.000
1.150.000
7.404.000
14/05/2015
14/05/2015
62
38,71%
7.350.000
1.450.000
840.000
1.400.000
3.690.000
19/05/2015
19/05/2015
55
74,55%
11.350.000
1.800.000
5.376.000
2.600.000
9.776.000
Indonesia South
FGD Pemanfaatan IPAL Komunal Kawasan
Rumah Ketua RT -
Sulawesi/Eastern
untuk Kader dan Tomas di Lembah Agro
Lembah Agro
Indonesia
Desa Passo Kota Ambon
South
Promosi Sanitasi untuk Masyarakat di Lokasi Kelurahan Rappokaling 10/05/2015
Sulawesi/Eastern
IPAL Komunal Kawasan program sAIIG
Indonesia
Kelurahan Rappokaling Kota Makassar
South
Promosi & Pemasaran Kredit Jamban Sehat
Kelurahan Uluale,
Sulawesi/Eastern
oleh KSU Denas 66 dengan Masyarakat di
Kelurahan Lawawoi,
Indonesia
Enam Kelurahan - Kabupaten Sidrap
Kelurahan Talumae Luar, Desa Mojong Luar, Kelurahan Sidenreng, and Kelurahan Empagae
Focus
South
Promosi & Pemasaran Kredit Jamban Sehat
Kelurahan Tadang
Group
Sulawesi/Eastern
oleh KSU Denas 66 dengan Masyarakat di
Palie & Kelurahan
Discussion Indonesia (cont')
Kelurahan Tadang Palie & Kelurahan Cempa Cempa
South
Promosi Sanitasi untuk Masyarakat di Lokasi Ruang Rapat SMP
Sulawesi/Eastern
IPAL Komunal Kawasan program sAIIG
Indonesia
Kelurahan Manggala Kota Makassar
South
FGD Evaluasi Proses Pemasaran Sanitasi di
Hotel Atiqa Syariah
Sulawesi/Eastern
Kabupaten Pinrang
Pinrang
South
FGD Revisi dan Penyempurnaan SOP
Jeneponto
20/05/2015
20/05/2015
16
6,25%
5.450.000
300.000
900.000
2.700.000
3.900.000
Sulawesi/Eastern
Feedback Mechanism (CEM) untuk
Indonesia
Pelayanan Publik di Kabupaten Jeneponto
South
Diskusi Draft Road Map Sanitation Untuk
Hotel Ibis Kota
22/05/2015
22/05/2015
19
31,58%
13.690.000
592.100
3.750.000
1.700.000
6.042.100
Sulawesi/Eastern
UPTD PAL dan Pokja AMPL untuk Persiapan Makassar
Indonesia
Penandatangan Dokumen Road Map Sanitasi Kantor IUWASH SSEI
27/05/2015
27/05/2015
6
16,67%
1.300.000
300.000
60.000
500.000
860.000
18/11/2014
20/11/2014
45
42,22%
65.636.000
3.202.400
9.652.400
9.600.000
22.454.800
19/04/2015
28/04/2015
15
0,00%
7.375.000
4.110.000
276.000
1.125.000
5.511.000
Negeri 1 Kel. Manggala
Indonesia
Kota Makassar South
FGD Perumusan Draft Peraturan Walikota
Sulawesi/Eastern
Tentang Mekanisme Penyedotan Lumpur
Indonesia
Tinja Terjadwal Kota Makassar
North Sumatra
Scope of Work Training of Trainers
Sapadia Hotel
“Pemicuan dan Pemasaran Sanitasi
Jl.Diponegoro Kota
Perkotaan” Pematangsiantar, 18-20
Pematangsiantar
Pengamatan Tekanan Air (NRW), Analisa
Stabat
Training of Trainers
North Sumatra
Hasil dan SOP
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
45
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province
Title
West
Monitoring dan Supervisi serta On the Job
Java/Banten/DKI
Training Lanjutan Bagi KWS (Kelompok
Jakarta
Wirausaha Sanitasi) Mendorong Investasi
Location
Starting Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
kab bandung
26/03/2015
10/04/2015
47
53,19%
32.795.000
1.000.000
726.000
200.000
1.926.000
Kecamatan Rembang
09/04/2015
10/04/2015
21
9,52%
10.420.000
6.853.500
2.016.000
1.100.000
9.969.500
ToT Pemicuan Paska Konstruksi
Hotel Proliman Kudus
27/10/2014
29/10/2014
18
66,67%
12.300.000
0
10.057.300
2.600.000
12.657.300
Pelatihan Penyiapan Masyarakat dalam
Meeting Room,
23/04/2015
24/04/2015
25
48,00%
14.595.000
3.135.300
8.340.000
3.300.000
14.775.300
Mendukung Program sAIIG Kab Gresik
Warung Legend,
South
ToT Kader dan Sanitarian untuk Promosi
Hotel Santika Kota
15/04/2015
16/04/2015
44
40,91%
19.700.000
2.840.000
11.775.000
5.200.000
19.815.000
Sulawesi/Eastern
Sanitasi IPAL Komunal program sAIIG Kota Makassar
Indonesia
Makassar
South
Lanjutan ToT Kader dan Sanitarian untuk
Hotel Santika Kota
24/04/2015
24/04/2015
42
35,71%
19.975.000
1.989.000
8.600.000
4.225.000
14.814.000
Sulawesi/Eastern
Promosi Sanitasi IPAL Komunal Kawasan
Makassar
Indonesia
mendukung Program sAIIG
North Sumatra
Pelatihan Promosi Cicilan WC Sehat dengan Hotel Sapadia
13/08/2014
15/08/2014
43
67,44%
34.100.000
3.372.740
150.000
0
3.522.740
21/01/2015
22/01/2015
19
0,00%
30.960.000
3.202.400
9.652.400
9.600.000
22.454.800
Kota Stabat
16/03/2015
19/03/2015
22
31,82%
19.535.000
3.655.300
3.000.000
4.080.000
10.735.300
Stabat
20/03/2015
20/03/2015
7
57,14%
2.300.000
0
0
0
0
Tebing Tinggi
25/03/2015
26/03/2015
24
0,00%
19.620.000
3.364.900
12.040.400
3.730.000
19.135.300
Berastagi
30/03/2015
01/04/2015
18
5,56%
42.500.000
2.598.850
33.300.000
5.900.000
41.798.850
Rumah Tangga untuk Peningkatan Akses Sanitasi individu melalui Kredit MIkro IUWASH - Dinkes Kab Bandung – BPR Kab Bandung Central Java
UJI COBA DAN PENGENALAN ALAT CETAK (MOLDING) TANGKI SEPTIK SNI ANTARA IUWASH DAN STAKEHOLDER
Training of Trainers (cont')
DI KAB. REMBANG Central JavaSPEKHAM (Grantee) East Java
Gresik
tim marketing Credit Union North Sumatra
On The Job Training - Pelatihan Pembuatan
Kelurahan Martoba
Septik Tank Berstandard SNI bagi Tukang
Kota Pematangsiantar
CU Mandiri dan CU Saroha Kota Pematangsiantar 21-22 Januari 2015 North Sumatra
Pelatihan Non Revenue Water di Kota Stabat PDAM Tirta Wampu Kab. Langkat
Training Course
North Sumatra
Training dan Review Penyusunan SOP (Standard Operating Procedure) Di PDAM Tirta Wampu Kabupaten Langkat
North Sumatra
WORKSHOP STRATEGI PEMASARAN BAGI PENGUSAHA SANITASI KOTA PEMATANG SIANTAR DAN TEBING TINGGI
North Sumatra
Training For Capacity Building Forum Komunikasi Pelanggan (Fkp) Of 4 Pdam’s Sumatra Utara
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
46
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province North Sumatra
Title
Location ruang bagian Humas
Konten dan SOP CEM kab. Labuhanbatui
Sekdakab Labuhanbatu
Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
31/03/2015
01/04/2015
46
21,74%
8.400.000
2.910.000
1.430.000
2.200.000
6.540.000
19/04/2015
28/04/2015
36
2,78%
18.650.000
60.000
3.733.400
6.600.000
10.393.400
27/05/2015
28/05/2015
33
57,58%
9.800.000
0
1.689.000
1.800.000
3.489.000
Pelatihan Kader dan Tomas program JUCBSS Kantor PD PAL Jaya
11/02/2015
04/04/2015
57
42,11%
18.650.000
3.359.500
3.704.392
7.570.000
14.633.892
West
Pelatihan Wirausaha Sanitasi Meningkatkan Kabupaten Bandung
03/12/2014
06/12/2014
39
74,36%
1.978.000
600.000
378.000
400.000
1.378.000
Java/Banten/DKI
Akses Sanitasi Individu Melalui
Jakarta
Pengembangan Wirausaha Sanitasi
26/01/2015
31/03/2015
374
37,70%
19.900.000
4.651.500
6.183.000
0
10.834.500
14/03/2015
15/03/2015
21
9,52%
9.460.000
600.000
7.426.000
0
8.026.000
Kabupaten Bekasi
18/03/2015
20/03/2015
37
29,73%
18.825.000
1.816.250
9.050.000
7.950.000
18.816.250
Serang
09/04/2015
10/04/2015
98
54,08%
11.875.000
4.515.375
3.000.000
5.000.000
12.515.375
11/04/2015
11/04/2015
99
64,65%
6.600.000
3.135.000
3.000.000
900.000
7.035.000
Kabupaten Serang
13/04/2015
14/04/2015
93
30,11%
11.875.000
3.099.500
3.000.000
5.000.000
11.099.500
15/04/2015
30/04/2015
85
1,18%
8.965.000
5.428.700
2.065.000
1.100.000
8.593.700
North Sumatra
Training Penyusunan Perbaikan WEB
Starting
Survey & Workshop Energy Efficiency Audit WTP PDAM Tirta for 2PDAMs
Bulian & PDAM Tirta Wampu
North Sumatra
Training Pembangunan Septictank Setara SNI Kelurahan Pondok Model Mono Chamber
West
Sayur
Java/Banten/DKI Jakarta
IUWASH – Dinas Kesehatan Kabupaten Bandung
Training
“Capacity Building KSM SANIMAS”
Java/Banten/DKI
Peningkatan Kapasitas Kelompok Pengguna
Jakarta
dan Pemanfaat serta Promosi PHBS bagi pengguna Sarana Sanitasi di Kabupaten
Course (cont')
3 - 6 Desember 2014
West
Serang (tahap I) West
Suport Capacity building KSM Margasana
Lenteng Agung, Kab.
Java/Banten/DKI
Kab. Serang ke IPAL Lenteng Agung dan
Sukabumi
Jakarta
IPAL Sukabumi 14 - 15 Maret 2015
West
Pelatihan Wirausaha Sanitasi dan praktek
Java/Banten/DKI
pembuatan septik tank SNI Kab. Bekasi 18 -
Jakarta
20 Maret 2015
West
Kegiatan Pelatihan PHBS dan O/M bagi
Java/Banten/DKI
penerima manfaat, Kader dan TOMAS
Jakarta
Program IPAL sAIIG di Desa Baros, Desa Ciruas, Kabupaten Serang
West
Conduct training, promotion, marketing and Kota Bekasi
Java/Banten/DKI
Survey/Sosialisasi Program Pelayanan Air
Jakarta
Minum (WS 5)
West
Kegiatan Pelatihan PHBS dan O/M bagi
Java/Banten/DKI
penerima manfaat, Kader dan TOMAS
Jakarta
Program IPAL sAIIG di Desa Curug goong, Desa Sentul, Kabupaten Serang
West
Capacity Building for KSM Sindang Mekar
Kecamatan Rajeg
Java/Banten/DKI
(Subur Makmur) Kabupaten Tangerang
Kabupaten Tangerang
Jakarta
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
47
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province
Title
Location
West
“Capacity Building KSM SANIMAS” Evaluasi Kabupaten Bandung
Java/Banten/DKI
dan Pembekalan teknis KSM dan AKSANSI
Jakarta
untuk kegiatan optimalisasi sistem SANIMAS
Starting Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
16/04/2015
23/04/2015
28
35,71%
7.000.000
450.000
3.128.550
2.900.000
6.478.550
Kabupaten Purwakarta 16/04/2015
23/04/2015
23
78,26%
6.800.000
3.880.000
0
1.600.000
5.480.000
04/05/2015
07/05/2015
166
50,00%
19.680.000
11.435.500
4.376.250
3.700.000
19.511.750
11/05/2015
13/05/2015
41
48,78%
17.650.000
8.227.000
1.645.100
4.200.000
14.072.100
25/03/2015
27/03/2015
23
60,87%
8.150.000
4.540.600
2.115.000
0
6.655.600
30/03/2015
01/04/2015
23
0,00%
8.650.000
7.500
1.110.000
3.750.000
4.867.500
13/04/2015
18/05/2015
34
23,53%
8.978.750
5.890.000
1.300.000
1.600.000
8.790.000
14/04/2015
16/04/2015
21
4,76%
4.000.000
0
2.065.000
0
2.065.000
15/04/2015
17/04/2015
13
69,23%
8.450.000
4.653.500
2.070.000
0
6.723.500
22/04/2015
23/04/2015
28
42,86%
11.300.000
2.550.000
7.175.000
2.575.000
12.300.000
29/04/2015
30/04/2015
28
25,00%
9.925.000
1.380.000
2.450.000
2.780.000
6.610.000
29/04/2015
29/04/2015
9
44,44%
3.275.000
1.532.400
434.500
525.000
2.491.900
dan SLBM di Kabupaten Bandung West
Penyempurnaan Web PDAM Purwakarta
Java/Banten/DKI Jakarta West
On The Job Training Pembuatan Septik Tank Wilayah Kabupaten
Java/Banten/DKI
SNI Peningkatan Akses Sanitasi Individu
Jakarta
IUWASH - Kab. Bekasi
West
Pelatihan Wirausaha Sanitasi dan Praktek
Java/Banten/DKI
Pembuatan Septiktank “Peningkatan Akses
Jakarta
Sanitasi Individu melalui Program 1000
Bekasi Kab Tangerang
Jamban” Central Java
Training Pengenalan dan Penyadaran Gender Balai RT 4 RW I untuk Program Pilot Gender untuk
Kelurahan Karang
Mendukung Program USRI 25 – 27 Maret
Asem Kecamatan
2015
Laweyan kota
Pelatihan Tukang Sumur Resapan Batang
Agrowisata Pagilaran
Surakarta Training Central Java
dan Desa Bismo
Course
Kecamatan Blado -
(cont') Central Java
Survey Verifikasi Sarana Sanitasi Individu
Rumah makan Kebon
Kerjasama IUWASH dan PNPM Mandiri
Djati
Perkotaan Kabupaten Rembang Central Java
Survey and Traning of Energy Efficiency
Kantor PDAM dan
Audit at 2 PDAMs, Step 1 (PDAM
lokasi IPA PDAM
Kabupaten Rembang) Central Java
Training Pengenalan dan Penyadaran Gender Balai Pertemuan RT 4 untuk Program Pilot Gender untuk
RW I Kelurahan
Mendukung Program USRI 15 – 17 April
Karangasem
2015
Kecamatan Laweyan
Training Produksi Talkshow Radio Isu Air
RM New Merapi
Kota Surakarta Central Java
Minum dan Sanitasi RSPD Kabupaten Klaten Klaten Central Java
Central Java
Pelatihan Membuat Desain Media Promosi
PDAM Klaten, dan
untuk FKP PDAM Kabupaten Klaten dan
Candi Resto Solo Baru
Kabupaten Sukoharjo
Sukoharjo
Training Intensif Teknik Wawancara
RM Banyu Mili, Klaten
Talkshow Radio Isu Air Minum dan Sanitasi RSPD Kabupaten Klaten
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
48
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province Central Java
Title
Location
Training Penulisan dan Presentasi Naskah
Studi Radio Siaran
serta Uji Coba Talkshow Radio Isu Air
Publik Daerah (RSPD)
Starting Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
07/05/2015
12/05/2015
16
37,50%
7.900.000
5.350.000
1.445.400
1.250.000
8.045.400
12/05/2015
12/05/2015
40
72,50%
2.250.000
250.000
700.000
1.000.000
1.950.000
26/05/2015
27/05/2015
38
10,53%
12.600.000
4.282.500
2.675.000
3.450.000
10.407.500
29/05/2015
15/06/2015
21
19,05%
7.970.000
1.862.000
2.945.000
2.100.000
6.907.000
07/11/2013
08/11/2013
9
66,67%
1.180.000
0
1.182.500
0
1.182.500
23/01/2014
23/01/2014
25
88,00%
3.250.000
1.225.000
1.200.000
500.000
2.925.000
12/03/2014
12/03/2014
17
88,24%
3.250.000
1.287.000
800.000
325.000
2.412.000
05/11/2014
05/11/2014
21
61,90%
4.500.000
1.960.000
800.000
375.000
3.135.000
29/12/2014
29/12/2014
66
57,58%
14.250.000
5.577.300
2.945.000
1.300.000
9.822.300
28/10/2014
29/10/2014
19
73,68%
9.750.000
3.770.400
2.550.000
2.185.000
8.505.400
05/11/2014
06/11/2014
24
50,00%
10.850.000
2.992.900
3.343.700
2.800.000
9.136.600
10/11/2014
11/11/2014
17
64,71%
10.850.000
3.381.100
3.638.300
2.100.000
9.119.400
11/11/2014
12/11/2014
25
60,00%
9.350.000
3.077.000
2.550.000
2.875.000
8.502.000
11/11/2014
12/11/2014
30
46,67%
9.350.000
2.714.950
2.550.000
3.250.000
8.514.950
Plalangan, Semarang
11/11/2014
12/11/2014
36
83,33%
12.750.000
3.104.300
3.919.600
3.960.000
10.983.900
Aula Kecamatan
15/11/2014
16/11/2014
28
67,86%
12.750.000
4.730.400
3.150.000
3.220.000
11.100.400
Minum dan Sanitasi RSPD Kabupaten Klaten Kabupaten Klaten Central Java
Training Manajemen KSM dan Tehnik
Sekretariat KSM
Perawatan Sarana Jamban dan Septic Tank
Dabagsari
Komunal kampung dabagsari Semanggi Central Java
Pelatihan Teknik Membangun Jamban
Balai Desa Bismo,
Keluarga Program CSR
Kecamatan Blado Kab. Batang
Central Java
Survey Verifikasi Sarana Sanitasi Individu
Lokasi PNPM
Kerjasama IUWASH dan PNPM Mandiri
Kabupaten Kudus
Perkotaan Kabupaten Kudus Central Java-GITA
Diskusi Persiapan Pelaksanaan Hibah Septic
Kantor Gita Pertiwi
PERTIWI (Grantee)
Tank Komunal di Jomblang
Surakarta
Central Java-GITA
Pelatihan PHBS (Perilaku Hidup Bersih dan
Sekretariat Gita
PERTIWI (Grantee)
Sehat) Progam Hibah Septic Tank Komunal
Pertiwi Jomblang
Central Java-GITA
Pelatihan Perilaku Hidup Bersih dan Sehat
Sekretariat Gita
PERTIWI (Grantee) Central Java-GITA Training Course (cont')
Pertiwi Jomblang Pelatihan Manajemen Organisasi Masyarakat
PERTIWI (Grantee)
Rumah Warga RT12 RW11
Central Java-GITA
Pelatihan Perawatan Septic Tank Komunal
Rumah Warga RT12
PERTIWI (Grantee)
dan Perawatan Sambungan Rumah
RW11
Central Java-
Pelatihan Pemicuan Bagi Masyarakat
Puskesmas Purwodiningratan
SPEKHAM (Grantee)
Jebres Central Java-
Pelatihan Pemicuan Bagi Masyarakat Desa
Balai Desa Babagan
SPEKHAM (Grantee) Babagan, Rembang
Rembang
Central Java-
Desa Tasiksono,
Pelatihan Pemicuan Bagi Masyarat Desa
SPEKHAM (Grantee) Tasiksono Lasem Rembang
Lasem, Rembang
Central Java-
Puskesmas Gajahan
Pelatihan Pemicuan Bagi Masyarakat
SPEKHAM (Grantee) Central Java-
Pasar Kliwon Pelatihan Pemicuan Bagi Masyarakat
SPEKHAM (Grantee) Central Java-
Balai Desa Mancasan Baki Sukoharjo
Pelatihan Pemicuan Bagi Masyarakat
SPEKHAM (Grantee) Plalangan, Semarang Central Java-
Pelatihan Pemicuan Bagi Masyarakat
SPEKHAM (Grantee) Kelurahan Ngaliyan, Semarang
Ngaliyan, Semarang
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
49
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province Central Java-
Title Pelatihan Pemicuan Bagi Masyarakat
Pelatihan Pemicuan Bagi Masyarakat
SPEKHAM (Grantee) Central Java-
Course (cont')
Pajang Laweyan,
Pelatihan Pemicuan Bagi Masyarakat Pandean Pandean Lamper,
SPEKHAM (Grantee) Lamper, Semarang
Semarang
Central Java-
Balai Desa Ngotet,
Pelatihan Pemicuan Bagi Masyarakat Desa
SPEKHAM (Grantee) Ngotet, Rembang
Rembang
Central Java-
Puskesmas Pudak
Pelatihan Pemicuan Bagi Masyarakat Pudak
SPEKHAM (Grantee) Payung, Semarang
Payung, Semarang
Central Java-
Desa Ngerangan
Central Java-
Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
18/11/2014
19/11/2014
31
45,16%
10.250.000
3.350.700
2.550.000
3.450.000
9.350.700
18/11/2014
19/11/2014
29
58,62%
9.350.000
2.895.000
2.557.000
3.075.000
8.527.000
18/11/2014
19/11/2014
16
93,75%
7.950.000
2.000.000
2.563.000
1.760.000
6.323.000
19/11/2014
20/11/2014
20
55,00%
10.850.000
3.403.500
2.550.000
2.400.000
8.353.500
22/11/2014
23/11/2014
14
64,29%
7.950.000
2.400.000
1.950.000
1.610.000
5.960.000
25/11/2014
26/11/2014
30
46,67%
10.250.000
3.227.100
2.550.000
3.450.000
9.227.100
Surakarta
Pelatihan Pemicuan Bagi Masyarakat
SPEKHAM (Grantee)
Training
Puskesmas Klaten
Starting
Tengah
SPEKHAM (Grantee) Central Java-
Location
Klaten 25/11/2014
26/11/2014
29
58,62%
10.850.000
3.351.000
2.550.000
3.350.000
9.251.000
SPEKHAM (Grantee) Tireman, Rembang
Pelatihan Pemicuan Bagi Masyarakat Desa
Rembang
Central Java-
Puskesmas Banyuanyar 26/11/2014
27/11/2014
27
51,85%
9.350.000
3.003.200
2.550.000
2.975.000
8.528.200
26/11/2014
27/11/2014
28
64,29%
10.450.000
3.489.900
3.167.500
3.130.000
9.787.400
03/12/2014
04/12/2014
30
56,67%
10.450.000
3.201.200
2.550.000
3.450.000
9.201.200
05/12/2014
06/12/2014
28
57,14%
10.450.000
3.825.200
3.249.000
3.205.000
10.279.200
05/06/2014
05/06/2014
20
10,00%
0
0
0
0
0
Pelatihan Pemicuan Bagi Masyarakat
SPEKHAM (Grantee) Central Java-
Balai Desa Tireman,
Banjarsari Surakarta Pelatihan Pemicuan Bagi Masyarakat Desa
Balai Desa Besito,
SPEKHAM (Grantee) Besito, Kudus
Kudus
Central Java-
Balai Desa
Pelatihan Pemicuan Bagi Masyarakat Desa
SPEKHAM (Grantee) Kedungdowo, Kudus
Kedungdowo, Kudus
Central Java-
Kelurahan Wergu
Pelatihan Pemicuan Bagi Masyarakat
SPEKHAM (Grantee) Kelurahan Wergu Wetan, Semarang
Wetan, Semarang
East Java
Serial Training Penyusunan SOP Keuangan
PDAM Kab Lamongan
dan Hubungan Pelanggan PDAM Kab
Office
Lamongan East Java
East Java
Serial Training Business Plan PDAM Kab
PDAM Kab Sidoarjo
02/12/2014
02/12/2014
8
25,00%
0
0
0
0
0
Sidoarjo Parts 2nd
Office
Pemicuan Sanitasi Perkotaan Berbasis
Balai Rw/RT Kelurahan 12/02/2015
25/03/2015
212
77,36%
11.550.000
950.000
4.500.000
4.950.000
10.400.000
Masyarakat (SPBM Mendukung Program
Patokan, Kecamatan
sAIIG di Kabupaten Probolinggo
Kraksaan
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
50
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province East Java
East Java
East Java
Title
Location
Serial Training (OJT) SOP PDAM Kab
PDAM Kab Jombang
Jombang Parts 4th
Office
Serial Training Business Plan PDAM
Kantor PDAM
Kabupaten Sidoarjo Part 3
Sidoarjo
Pelatihan Perencanaan dan Penganggaran
Ruang Pertemuan
Responsif Gender Bagi Staf BAPPEDA
Asisten Setda Jombang
Starting Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
11/02/2015
11/02/2015
6
50,00%
0
0
0
0
0
04/03/2015
04/03/2015
5
20,00%
0
0
0
0
0
09/03/2015
09/03/2015
26
50,00%
3.500.000
1.700.000
0
600.000
2.300.000
10/03/2015
11/03/2015
6
50,00%
0
0
0
0
0
16/03/2015
17/03/2015
26
80,77%
16.225.000
2.504.000
7.500.000
5.000.000
15.004.000
16/03/2015
16/03/2015
10
40,00%
850.000
100.000
544.000
0
644.000
17/03/2015
17/03/2015
12
41,67%
1.450.000
226.000
882.100
0
1.108.100
18/03/2015
18/03/2015
147
94,56%
10.100.000
2.777.650
4.500.000
2.300.000
9.577.650
ORIN Restaurant
24/03/2015
25/03/2015
26
69,23%
12.710.000
1.349.300
5.215.000
3.525.000
10.089.300
Pelatihan Pemasaran Sanitasi – Promosi
RM Sri Kedaton
07/04/2015
08/04/2015
41
90,24%
15.790.000
921.700
6.700.000
5.850.000
13.471.700
Tingkat Rumah Tangga Gel. 2 Kab Jombang
Mojoagung
Serial Training Business Plan PDAM
PDAM Kab Sidoarjo
10/04/2015
10/04/2015
4
50,00%
0
0
0
0
0
14/04/2015
14/04/2015
38
28,95%
3.675.000
744.000
2.400.000
0
3.144.000
16/04/2015
16/04/2015
10
50,00%
1.010.000
100.000
663.200
0
763.200
20/04/2015
21/04/2015
43
44,19%
17.450.000
3.521.200
6.024.000
6.150.000
15.695.200
Kabupaten Jombang East Java
East Java
Serial Training 4th (Continued) SOP Non
PDAM Kab Jombang
Technic PDAM Kab Jombang -
Office
Pelatihan Sanitasi Total Berbasis Masyarakat
Hotel Sahid Montana,
(STBM) bagi Sanitarian dan Kader Kesehatan Jl. Kahuripan no. 9, Puskesmas Lawang, Pakis Aji, Pakis, Turen
Malang
dan Tumpang East Java
East Java Training
Pendampingan Penyusunan Tarif PDAM
PDAM Kota
Kota Mojokerto
Mojokerto
Serial Traning SOP Non Teknik PDAM Kota PDAM Kota Mojokerto ke 4 Lanjutan
Mojokerto
Praktek Pemicuan dan Promosi Sanitasi Kab
Hotel Montana,
Malang
Puskesmas Lawang,
Course (cont')
East Java
Puskesmas Pakis, East Java
Pelatihan Pemasaran Sanitasi – Promosi Tingkat Rumah Tangga Kota Probolinggo
East Java
East Java
Kabupaten Sidoarjo Part 4th East Java
East Java
East Java
Pelatihan Marketing dan Promosi Pembiayaan PDAM Kabupaten Mikro PDAM Kabupaten Malang
Malang
Pendampingan Penyusunan Tarif PDAM
PDAM Kota
Kota Mojokerto ke 2
Mojokerto
Pelatihan dan Praktek Pembuatan Septictank Restoran Zam-Zam UpFlow Filter Kabupaten Jombang, 20-21
dan Kelurahan Pulo
April 2015
Lor
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
51
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province East Java
East Java
East Java
Title
Location
Pendampingan Penyusunan Tarif PDAM
PDAM Kota
Kota Mojokerto ke 3
Mojokerto
Pelatihan SOP Teknik dan Non Teknik
PDAM Kab
PDAM Kabupaten Probolinggo
Probolinggo office
Serial Training Penyusunan SOP UPTD PAL Meeting Room, RM Gresik (part 1)
Starting Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
22/04/2015
22/04/2015
12
41,67%
1.010.000
122.500
618.600
0
741.100
24/04/2015
24/04/2015
32
21,87%
0
0
0
0
0
27/04/2015
28/04/2015
15
13,33%
9.140.000
150.000
6.507.100
2.100.000
8.757.100
05/05/2015
06/05/2015
31
38,71%
18.310.000
1.344.000
6.330.000
3.675.000
11.349.000
05/05/2015
05/05/2015
6
33,33%
0
0
0
0
0
06/05/2015
06/05/2015
5
40,00%
0
0
0
0
0
11/05/2015
11/05/2015
9
11,11%
1.000.000
175.000
433.400
0
608.400
12/05/2015
13/05/2015
16
18,75%
9.190.000
450.000
6.172.500
2.100.000
8.722.500
12/05/2015
12/05/2015
16
31,25%
5.170.000
744.000
2.700.000
1.125.000
4.569.000
12/05/2015
12/05/2015
9
33,33%
4.350.000
294.000
1.439.000
525.000
2.258.000
Warung Legend, Gresik
East Java
Pelatihan Peningkatan Kapasitas KPP dan
RM Heny, Jombang
Sanitarian dalam Pemeliharaan dan Operasional IPAL Komunal di Kab. Jombang East Java
East Java
East Java Training Course (cont')
East Java
Serial Training Business Plan Part 5th PDAM PDAM Kab Sidoarjo Kab Sidoarjo
office
Serial Training Business Plan 2015 - 2019
PDAM Kab Gresik
Part 1st PDAM Kab Gresik
Office
Pelatihan Penyusunan SOP Teknik PDAM
PDAM Kota
Kota Mojokerto
Mojokerto
Serial Pelatihan Penyusunan SOP untuk
Ruang Pertemuan RM
UPTD PAL Kabupaten Gresik (Part 2)
Warung Legend, Gresik
East Java
East Java
East Java
FGD Identifikasi Kebutuhan Pendampingan
Ruang Pertemuan RM
UPTD PSL Kota Probolinggo
ORIN, Probolinggo
FGD Persiapan Pembuatan WEB Air Limbah Ruang meeting Rumah Domestik Media CEM Kabupaten Gresik,
Makan Warung
Provinsi Jawa Timur
Legend kabupaten
Pelatihan Peningkatan Kapasitas SME untuk
Kota Batu
19/05/2015
21/05/2015
36
41,67%
82.250.000
1.359.700
0
16.000.000
17.359.700
Serial Pelatihan Penyusunan SOP untuk
Ruang Pertemuan,
21/05/2015
21/05/2015
22
31,82%
8.690.000
569.000
5.100.000
2.200.000
7.869.000
UPTD PSL Kota Probolinggo (bagian 1)
Kampung Kita, Bremi, 22/05/2015
22/05/2015
21
19,05%
0
0
0
0
0
23/05/2015
23/05/2015
7
28,57%
0
0
0
0
0
Manajemen dan Kelembagaan East Java
Kab Probolinggo East Java
East Java
Pelatihan Penyusunan SOP Teknik dan Non PDAM Kab Teknik PDAM Kab Probolinggo Parts 2
Probolinggo
Serial Training Business Plan PDAM
PDAM Kabupaten
Kabupaten Gresik 2015-2019 Parts 2
Gresik office
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
52
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province East Java
Title
Location
Serial Pelatihan Penyusunan SOP untuk
Ruang Pertemuan RM
UPTD PAL Kabupaten Gresik (part 3)
Warung Legend,
Starting Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
25/05/2015 26/05/2015
15
26,67%
9.140.000
45.000
7.489.500
1.875.000
9.409.500
16/03/2015 17/03/2015
23
30,43%
44.209.000
2.371.800
27.460.000
6.400.000
36.231.800
18/03/2015 20/03/2015
20
45,00%
6.820.000
600.000
1.539.500
0
2.139.500
Kabupaten Bantaeng
23/04/2015 24/04/2015
28
25,00%
10.215.000
900.000
2.070.000
4.800.000
7.770.000
Horison Hotel Kota
29/04/2015 01/05/2015
19
5,26%
19.975.000
2.850.000
7.120.013
5.400.000
15.370.013
12/05/2015 12/05/2015
16
18,75%
7.200.000
75.000
3.150.000
1.600.000
4.825.000
17/3/2015
17/3/2015
13
76,92%
2.100.000
0
700.000
600.000
1.300.000
22/3/2015
22/3/2015
20
30,00%
1.900.000
0
875.000
1.000.000
1.875.000
25/3/2015
25/3/2015
14
28,57%
1.400.000
0
700.000
700.000
1.400.000
25/3/2015
25/3/2015
10
0,00%
1.000.000
0
525.000
500.000
1.025.000
Gresik South
Pelatihan Advokasi dan Komunikasi Berbasis Hotel Ibis Makassar
Sulawesi/Eastern
Gender
Indonesia South
Pelatihan Lanjutan SOP & Road Map untuk
Ruang Rapat Dinas
Sulawesi/Eastern
UPTD PAL dan Kunjugan ke IPLT di Koya
Kebersihan dan
Indonesia
Koso Kota Jayapura
Pemakaman Kota Jayapura dan IPLT Koya Koso
South
Pemetaan Kondisi Air Bersih dan Sanitasi
Sulawesi/Eastern
di Kabupaten Bantaeng
Indonesia
Training Course (cont')
South
Pelatihan SOP Pengelolaan Instalasi
Sulawesi/Eastern
Pengolahan Lumpur Tinja (IPLT) Koya Koso Jayapura
Indonesia
untuk UPTD PAL KOTA JAYAPURA
South
Kick of Meeting Accounting System
Sulawesi/Eastern
Improvement PDAM Parepare Parepare, 12 Parepare
Indonesia
Mei 2015
South
Praktek Lapangan Pelatihan Teknis
Sulawesi/Eastern
Konstruksi KSM Pengelolaan Sanitasi Tingkat Desa Soreang Kab.
Indonesia-DKM
Kab. Takalar
Takalar
South
Praktek Lapangan Pelatihan Teknis
Lokasi MCK ++ di Kel.
Sulawesi/Eastern
Konstruksi KSM Pengelolaan Sanitasi Tingkat Lakessi Kota Parepare
Indonesia-DKM
Kota Parepare
Hotel Permatasari
Lokasi MCK + SR di
(Grantee)
(Grantee) South
Praktek Lapangan Pelatihan Teknis
Sulawesi/Eastern
Konstruksi KSM Pengelolaan Sanitasi Tingkat Bentenge Kab. Pinrang
Lokasi MCK ++ di Kel.
Indonesia-DKM
Kab. Pinrang
(Grantee) South
Praktek Lapangan Pelatihan Teknis
Sulawesi/Eastern
Konstruksi KSM Pengelolaan Sanitasi Tingkat Pangkajene Kab. Sidrap
Lokasi MCK ++ di Kel.
Indonesia-DKM
Kab. Sidrap
(Grantee)
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
53
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Title
Province North Sumatra
Location
Workshop Pembahasan Perjanjian Kerja
IUWASH Medan
Sama (PKS) Penyelenggaraan Sistem
Office
Starting Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
03/03/2015
12/03/2015
7
28,57%
19.950.000
10.876.000
1.959.600
1.150.000
13.985.600
04/03/2015
05/03/2015
6
0,00%
3.400.000
0
2.480.000
0
2.480.000
11/03/2015
11/03/2015
18
22,22%
17.250.000
2.012.500
2.883.000
8.788.720
13.684.220
DKI Jakarta
07/01/2015
30/01/2015
168
39,88%
8.000.000
0
6.080.000
0
6.080.000
Kabupaten Bandung
20/01/2015
20/01/2015
35
42,86%
10.087.500
1.169.000
3.687.500
1.400.000
6.256.500
Serang
06/03/2015
06/03/2015
32
68,75%
8.475.000
1.310.000
2.775.000
2.700.000
6.785.000
09/03/2015
11/03/2015
5
20,00%
3.120.000
0
991.300
0
991.300
Kelurahan Kapuk
17/03/2015
17/03/2015
48
56,25%
2.500.000
0
1.675.000
0
1.675.000
Tangerang Selatan
24/03/2015
24/03/2015
22
54,55%
2.050.000
800.000
1.250.000
0
2.050.000
Kota Bekasi
31/03/2015
31/03/2015
145
35,17%
25.710.000
7.506.500
6.845.000
3.600.000
17.951.500
06/04/2015
06/04/2015
32
28,13%
9.700.000
1.365.000
466.000
3.100.000
4.931.000
06/04/2015
06/04/2015
25
28,00%
4.000.000
0
1.350.000
1.300.000
2.650.000
Pengelolaan Air Limbah (SPAL) Kota Medan North Sumatra
Workshop Pengenalan dan Pelatihan
Golden Flower Hotel,
Management Information System (MIS)
Jl. Asia Afrika 15-17,
Penyediaan Air Bersih untuk PDAM Mitra
Bandung, Jawa Barat.
IUWASH di Regional Jawa Barat, DKI dan Banten North Sumatra
PEMBAHASAN DRAFT PERJANJIAN
Kantor Dinas
KERJASAMA PENGEMBANGAN
Perumahan dan
PENYELENGARAAN SISTEM
Permukiman Kota
PENGELOLAAN AIR LIMBAH KOTA
Medan
MEDAN - BERSAMA TIM DARI DIRJEN CIPTA KARYA KEMEN PU&PR West
Socialization of Master Meter Program and
Java/Banten/DKI
Selection of CBOs DKI Jakarta (Pademangan,
Jakarta
Tanah Merah, Pulo Gebang & Rawa Buaya)
West
WORKSHOP STUDI KERENTANAN
Java/Banten/DKI
SUMBERDAYA AIR (CCVA) KABUPATEN
Jakarta
BANDUNG
Workshop West Java/Banten/DKI
CC 3 - Workshop Citizen Engagement Mechanism (Mekanisme Keterlibatan Warga)
Jakarta
dalam Pembangunan Air Minum dan Sanitasi
West
Training Finance,Grant Management, PMP,
IUWASH NAtional
Java/Banten/DKI
Environmental Compliance, TraiNet,
Meeting Room
Jakarta
Gender, Grant Program SSS Bekasi
West
Socialization of Master Meter Program and
Java/Banten/DKI
Selection of CBOs DKI Jakarta in Kel.
Jakarta
Peternakan-Jakarta Barat
West
Mini Workshop Pembentukan UPTD PAL
Java/Banten/DKI
Kota Tangerang Selatan
Kab. Serang
Jakarta West
Launching and Socialization Perwal STBM
Java/Banten/DKI
Kota Bekasi
Jakarta West
Pelatihan Forum Komunikasi Pelanggan (FKP) Serang
Java/Banten/DKI
PDAM Tirta Albantani Kabupaten Serang
Jakarta West
workshop penyusunan perbub STBM;
Meeting room dinas
Java/Banten/DKI
Payung Hukum pelaksanaan program 1000
kesehatan
Jakarta
jamba, Kab Tangerrang
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
54
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province
Title
Location
West
Pelatihan Forum Komunikasi Pelanggan (FKP) PDAM Tirta Patriot
Java/Banten/DKI
PDAM Tirta Patriot Kota Bekasi
Kota Bekasi
Workshop III CEM Kab. Serang
West
Penyusunan petunjuk tehnis dan RAB serta
Java/Banten/DKI
design program 1000 jamban
Starting Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
28/04/2015 28/04/2015
53
13,21%
8.200.000
1.245.000
2.100.000
4.700.000
8.045.000
Kabupaten Serang
14/04/2015 14/04/2015
25
20,00%
8.475.000
750.000
2.373.000
2.500.000
5.623.000
Kabupaten Tangerang
15/04/2015 15/04/2015
28
42,86%
4.100.000
0
1.105.000
1.300.000
2.405.000
Kelurahan
07/05/2015 07/05/2015
47
78,72%
6.930.000
70.000
1.750.000
4.300.000
6.120.000
20/04/2015 20/04/2015
26
3,85%
1.400.000
0
966.000
0
966.000
20/05/2015 20/05/2015
67
13,43%
19.000.000
4.005.000
7.300.000
5.400.000
16.705.000
19/05/2015 19/05/2015
76
14,47%
19.000.000
4.022.000
7.920.000
6.200.000
18.142.000
19/05/2015 19/05/2015
22
54,55%
2.065.464
800.000
1.250.000
0
2.050.000
Jakarta West Java/Banten/DKI Jakarta
Jakarta West
Pertemuan PKK: Berbagi Pengalaman
Java/Banten/DKI
Mempromosikan Sanitasi di Perkotaan Dalam Kemanggisan office
Jakarta
Rangka Mendukung Sedot Lumpur Tinja
West
Workshop Peningkatan Kapasitas dan
Java/Banten/DKI
Evaluasi Mitra Konstruksi
Terjadwal Kantor Koperasi KPP
Jakarta West
Capacity Building KSM SANIMAS Monitoring Kabupaten Lebak
Java/Banten/DKI
dan evaluasi penggunaan sarana SANIMAS
Jakarta
dan SLBM serta pembentukan Asosiasi KSM
Workshop
Sanitasi seluruh Indonesia (AKSANSI) di
(cont')
Kabupaten Lebak West
Capacity Building KSM SANIMAS Monitoring Kab. Serang
Java/Banten/DKI
dan evaluasi penggunaan sarana SANIMAS
Jakarta
dan SLBM serta pembentukan Asosiasi KSM Sanitasi seluruh Indonesia (AKSANSI) di Kabupaten Serang
West
Workshop Pembentukan UPTD PAL Kota
Kota Tangerang
Java/Banten/DKI
Tangerang Selatan
Selatan
West
Pelatihan Public Relation for PDAM Tirta
Lebak, Banten
26/05/2015 27/05/2015
24
37,50%
14.300.000
5.018.150
4.400.880
4.900.000
14.319.030
Java/Banten/DKI
Multatuli Kabupaten Lebak 29/05/2015 29/05/2015
14
50,00%
2.850.000
0
1.500.000
1.300.000
2.800.000
05/03/2015 06/03/2015
20
25,00%
7.700.000
337.800
3.034.400
1.000.000
4.372.200
Jakarta
Jakarta West
Sosialisasi tata cara pencairan dana hibah
Kecamatan Sukatani
Java/Banten/DKI
jamban sehat dan cara pengisian format
Kabupaten Bekasi
Jakarta
monitoring individual sistem
kab. Bekasi 29
Mei 2015 Central Java
WORKSHOP PENDATAAN
Sendang Sari Kab
PEMBANGUNAN JAMBAN KELUARGA
Batang
KERJASAMA PROGRAM PNPM MANDIRI PERKOTAAN KABUPATEN BATANG
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
55
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province Central Java
Title
Fasilitasi Workshop Sosialisasi SL2T2 Tingkat Balai Kota Surakarta Kota Kota Surakarta
Central Java
Central Java
Central Java
Location
Starting Date
End Date Participants % Female Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
10/03/2015 10/03/2015
85
30,59%
12.587.500
2.440.000
0
1.750.000
4.190.000
ruang Manganti Projo
Lokakarya Dukungan Anggaran Daerah untuk Hotel The Sunan Jalan
11/03/2015 12/03/2015
24
25,00%
44.000.000
1.190.000
21.700.000
8.600.000
31.490.000
Sektor Air Minum dan Sanitasi
Ahmad Yani Surakarta
Workshop Uji Coba Perdes Tata Kelola
Agrowisata Salib Putih - 12/03/2015 12/03/2015
41
19,51%
10.270.000
1.438.000
4.000.000
2.625.000
8.063.000
Sumber Daya Air
Salatiga
WORKSHOP PENDATAAN
Hotel Dafam,
12/03/2015 12/03/2015
33
39,39%
9.250.000
850.000
3.900.000
1.600.000
6.350.000
PEMBANGUNAN JAMBAN KELUARGA
Sukoharjo
16/03/2015 16/03/2015
15
33,33%
8.940.000
450.000
4.400.000
1.450.000
6.300.000
25/03/2015 27/03/2015
16
43,75%
19.500.000
1.655.000
13.750.000
2.200.000
17.605.000
25/03/2015 26/03/2015
25
16,00%
60.740.000
6.226.500
40.560.000
7.551.500
54.338.000
31/03/2015 01/04/2015
46
19,57%
31.200.000
3.600.000
22.495.000
2.000.000
28.095.000
01/04/2015 20/05/2015
117
14,53%
12.000.000
1.800.000
1.350.000
550.000
3.700.000
KERJASAMA PROGRAM PNPM MANDIRI PERKOTAAN KABUPATEN SUKOHARJO Central Java
WORKSHOP PENDATAAN
Hotel Grand Wahid
PEMBANGUNAN JAMBAN KELUARGA
Salatiga
KERJASAMA PROGRAM PNPM MANDIRI Workshop
PERKOTAAN KOTA SALATIGA dan
(cont')
KABUPATEN SEMARANG Central Java
(Revisi 1) Lokakarya Partisipatif Penyusunan Hotel Paragon, Kota Road Map Pengelolaan Air Limbah Domestik Surakarta Kota Surakarta
Central Java
Workshop Pengenalan dan Pelatihan Management Information System (MIS) Penyediaan Air Bersih untuk PDAM Mitra
Central Java
Central Java
Workshop Regional Forum Komunikasi
Agrowisata Pagilaran,
Pelanggan PDAM Mitra IUWASH Jawa
Mata Air Bismo, Desa
Tengah
Bismo, Resto Gubug
Fasilitasi (3) Workshop Sosialisasi SL2T2
Kantor Kelurahan:
Tingkat Kelurahan (Jebres, Mojosongo,
(Jebres, Mojosongo,
Tegalharjo – Kec.Jebres ; Kadipiro, Nusukan, Tegalharjo – Banyuanyar, Sumber, Manahan –
Kec.Jebres ; Kadipiro,
Kec.Banjarsari) di Kota Surakarta
Nusukan, Banyuanyar, Sumber, Manahan – Kec.Banjarsari) Kota Surakarta
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
56
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province Central Java
Title
Location
Fasilitasi (2) Workshop Sosialisasi SL2T2
Kantor Kelurahan:
Tingkat Kelurahan (Kestalan, Ketelan,
(Kestalan, Ketelan,
Gilingan, Setabelan, Timuran, Keprabon,
Gilingan, Setabelan,
Starting Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
03/04/2015 22/05/2015
86
22,09%
12.000.000
1.950.000
1.350.000
300.000
3.600.000
22/04/2015 23/04/2015
33
0,00%
13.200.000
195.000
4.834.000
3.000.000
8.029.000
Hotel Solo Paragon
06/05/2015 06/05/2015
19
21,05%
4.550.000
700.000
3.000.000
600.000
4.300.000
Hotel Solo paragon
07/05/2015 07/05/2015
25
16,00%
9.696.250
522.500
5.250.000
1.050.000
6.822.500
WORKSHOP PENDATAAN
BAlemong Resort
11/05/2015 11/05/2015
17
35,29%
5.300.000
860.000
3.450.000
850.000
5.160.000
PEMBANGUNAN JAMBAN KELUARGA
Ungaran
18/05/2015 18/05/2015
55
30,91%
5.500.000
633.600
3.465.000
2.000.000
6.098.600
25
52,00%
4.025.000
1.018.400
690.000
525.000
2.233.400
28/05/2015 29/05/2015
34
0,00%
10.000.000
697.000
5.392.000
3.100.000
9.189.000
Workshop hasil Survey Pembiayaan Air Bagi Hotel Sunan Surakarta 29/05/2015 29/05/2015
14
14,29%
4.750.000
630.400
2.800.000
650.000
4.080.400
29/01/2014 29/01/2014
20
75,00%
3.500.000
502.000
2.404.500
750.000
3.656.500
21/07/2014 21/07/2014
42
19,05%
19.725.000
2.000.000
11.550.000
6.735.300
20.285.300
Punggawan, Mangkubumen – Kec.Banjarsari) Timuran, Keprabon, di Kota Surakarta
Punggawan, Mangkubumen – Kec.Banjarsari) Kota Surakarta
Central Java
EVALUASI FORMATIF PEMBANGUNAN
Restoran Gubug
SUMUR RESAPAN BATANG
Silengkong Blado Batang
Central Java
FGD Pembahasan Potensi Pinjaman Bank untuk Program IPA Semanggi PDAM Kota Surakarta
Central Java
Workshop Sensus Septic tank kepada pelanggan PDAM Surakarta
Central Java Workshop
KERJASAMA PROGRAM PNPM MANDIRI
(cont')
PERKOTAAN KABUPATEN SEMARANG Central Java
Central Java
Workshop: Menyusun STrategi Implementasi Balai Desa Patemon RPJMDes/Perdes Desa Patemon - Kab.
Kecamatan Tengaran -
Semarang
Kabupaten Semarang
Sosialisasi aksi perawatan sarana sanitasi
SDN Karangasem Solo 20/05/2015 20/05/2015
keluarga dan komunal tingkat masyarakat Pilot Program Gendder Karangasem RT 4 RW I Kecamatan Laweyan Surakarta 20 Mei 2015 Central Java
Evaluasi Formatif tahap Kedua Pembangunan Balai Desa Sumur Resapan Batang
Tambakboyo Kecamatan Reban -
Central Java
Masyarakat Berpenghasilan Rendah dari Program Master Meter di Kelurahan Semanggi Kota Surakarta Central Java-GITA
Lokakarya Pembentukan/Penguatan KSM
PERTIWI (Grantee)
Pertiwi Jomblang
Central Java-KOMPIP Kick Off Meeting dan Sosialisasi Program (Grantee)
Sekretariat Gita
Forum Pelanggan di Jawa Tengah
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
57
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Title
Province Central Java-
Workshop Penyusunan Modul TOT
Location
Starting Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
Hotel Sarila Solo
08/12/2014 09/12/2014
13
53,85%
2.000.000
0
1.950.000
0
1.950.000
Kota Batu
10/03/2015 11/03/2015
36
16,67%
19.800.000
2.745.165
12.400.000
2.700.000
17.845.165
Workshop on Climate Change Adaptation
Hotel Harris - Kota
12/03/2015 13/03/2015
33
30,30%
19.840.000
3.190.965
13.440.000
2.025.000
18.655.965
Planning for Water Supply System of Kota
malang 24/03/2015 24/03/2015
39
25,64%
11.795.000
5.570.462
4.500.000
0
10.070.462
24/03/2015 24/03/2015
30
33,33%
19.400.000
2.931.000
5.261.770
8.566.378
16.759.148
24/03/2015 24/03/2015
63
30,16%
19.080.000
4.937.000
3.706.100
4.150.000
12.793.100
24/03/2015 24/03/2015
28
21,43%
12.675.000
1.632.000
5.500.000
2.025.000
9.157.000
25/03/2015 26/03/2015
28
14,29%
19.945.000
6.135.656
7.920.000
4.600.000
18.655.656
25/03/2015 25/03/2015
17
23,53%
6.375.000
644.000
3.207.000
1.972.500
5.823.500
14/04/2015 16/04/2015
23
52,17%
22.835.000
4.129.200
12.000.000
4.800.000
20.929.200
SPEKHAM (Grantee) Penguatan KPP East Java
Workshop on Climate Change Adaptation Planning for Water Supply System of Kota Batu
East Java
Malang East Java
Visioning Workshop Program Air Bersih dan Ruang Pertemuan Sanitasi Bagi Penentu Kebijakan Kabupaten
Sasana Nayaka Pemda
Lamongan
Kabupaten Lamongan Jalan
: Jl. Basuki
Rahmat No. 02 Lamongan East Java
East Java Workshop (cont')
East Java
Workshop Berbagi Pengalaman dalam
Ruang Pertemuan
Pengelolaan Air Limbah Domestik Bagi Kota
Kantor PDAM Kota
Malang
Malang
Workshop Koordinasi Pengelolaan Sarana
Ruang Pertemuan
Sanitasi Komunal Secara Terpadu di Kota
Bappeko, Jl. Pacar,
Surabaya 24 Maret 2015
Surabaya
Workshop on Climate Change Adaptation
Hotel Bromo View-
Planning for Water Supply System and
Kota Probolinggo
regulatory role of Kabupaten/ Kota Probolinggo East Java East Java
Workshop ARM-CCA for Water Supply
Hotel Bromo View,
System of Kabupaten/ Kota Probolinggo
Kota Probolinggo
Pelatihan Kapasitas Penyiar Bromo FM
Ruang Pertemuan
untuk mendukung CEM program Air minum Hotel Alliya dan Sanitasi Kabupaten Probolinggo
Kabupaten Probolinggo. Jalan Mayjen Sutoyo No. 115 Kraksaan Probolinggo 0335841999
East Java
Workshop Peningkatan Kapasitas Pokja
Hotel Bromo View,
Sanitasi dan UPTD Berkelanjutan (tahap 2)
Kota Probolinggo. Jln.
Kota Probolinggo, Provinsi Jawa Timur
Raya Bromo KM. 05 Triwung Lor, Probolinggo, Jawa Timur
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
58
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province East Java
Title
Location
Launching Peraturan Bupati Revitalisasi P3M Tempat : Ruang
Starting Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
15/04/2015 15/04/2015
55
50,91%
11.425.000
1.663.000
2.940.000
3.750.000
8.353.000
05/05/2015 05/05/2015
30
80,00%
14.600.000
2.660.000
7.200.000
2.375.000
12.235.000
19/05/2015 19/05/2015
31
22,58%
12.242.500
2.950.000
5.775.000
2.000.000
10.725.000
RM Jimbaran
25/05/2015 25/05/2015
16
18,75%
6.140.000
1.603.800
2.940.700
1.200.000
5.744.500
Workshop SOP Non Teknik PDAM Djobel
162 Chit Chat Resto
26/05/2015 26/05/2015
46
6,52%
12.300.000
2.489.500
5.643.000
2.850.000
10.982.500
Tirta Kabupaten Mojokerto
& Lounge
Workshop SOP Non Teknik PDAM
RM Henni Jombang
27/05/2015 27/05/2015
32
31,25%
9.500.000
1.465.000
4.045.000
2.175.000
7.685.000
09/03/2015 09/03/2015
22
27,27%
17.570.000
1.075.000
6.450.000
1.800.000
9.325.000
41
34,15%
21.540.000
1.919.000
11.856.000
8.300.000
22.075.000
Kabupaten Sidoarjo, Provinsi Jawa Timur
Pertemuan Delta Karya Kabupaten Sidoarjo Jalan : Jl. Sultan Agung, Kabupaten Sidoarjo
East Java
Lokakarya Audit PPRG Kabupaten Malang
Swiss Belin Hotel, Malang
East Java
Sosialisasi Perbup No 8 Tahun 2015 tentang Ruang Pertemuan Pengelolaan Resapan dan Tangkapan Air
Gajahmada Hotel
Berkelanjutan Kabupaten Malang Provinsi
Jl.dr. Sucipto No: 17
Jawa Timur
Kota Malang. Telp : 0341 – 331 331
East Java
Workshop SOP Non Teknik PDAM Kota Mojokerto
East Java
Workshop East Java (cont')
Kabupaten Jombang
South
Workshop Advokasi Pokja AMPL dan
Hotel Santika Kota
Sulawesi/Eastern
PROSINTA untuk Pengenalan DED IPAL
Makassar
Indonesia
Komunal Skala Kawasan program sAIIG SAN 3
South
Workshop Monitoring Kemajauan
Hotel Delima Sari Kota 24/03/2015 25/03/2015
Sulawesi/Eastern
Pembangunan IPAL-Komunal dan
Parepare
Indonesia
Penyusunan Strategi & Rencana Aksi Promosi Sanitasi Bagi Para Pihak di Tingkat Kota dan PuskesmasTahun Anggaran 20112014 Di Kota Pare-pare
South
WORKSHOP STUDI KERENTANAN
Sulawesi/Eastern
SUMBERDAYA AIR (CCVA) WILAYAH
Indonesia
KABUPATEN ENREKANG, SIDRAP,
Kota Parepare
24/03/2015 25/03/2015
59
28,81%
32.750.000
363.000
11.200.000
5.350.000
16.913.000
Kantor Desa Nania
06/04/2015 06/04/2015
36
47,22%
6.100.000
150.000
2.009.000
1.750.000
3.909.000
PAREPARE DAN PINRANG, PROPINSI SULAWESI SELATAN South
Pelatihan Kader & Tokoh Masyarakat di
Sulawesi/Eastern
Nania
Indonesia
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
59
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province
Title
Location
South
WORKSHOP PENILAIAN RESIKO
Sulawesi/Eastern
TERHADAP ASET (ARM) DAN
Indonesia
PENYUSUNAN DOKUMEN RENCANA
Starting Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
Aula Pemda Enrekang
07/04/2015 08/04/2015
34
32,35%
5.146.000
492.000
2.160.000
2.000.000
4.652.000
Aula Pemda Pinrang
09/04/2015 10/04/2015
35
48,57%
5.940.000
291.000
2.940.000
2.500.000
5.731.000
13/04/2015 14/04/2015
21
42,86%
5.346.000
875.000
1.998.000
1.800.000
4.673.000
Kabupaten Enrekang
14/04/2015 14/04/2015
29
34,48%
5.295.000
350.000
1.240.000
1.450.000
3.040.000
14/04/2015 14/04/2015
21
28,57%
8.440.000
1.075.000
1.795.500
3.150.000
6.020.500
15/04/2015 15/04/2015
45
28,89%
7.635.000
1.702.700
2.695.000
2.300.000
6.697.700
15/04/2015 16/04/2015
23
47,83%
5.346.000
875.000
2.700.000
1.900.000
5.475.000
17/04/2015 17/04/2015
96
28,13%
19.500.000
2.500.000
4.500.000
8.300.000
15.300.000
26/04/2015 26/04/2015
52
48,08%
2.000.000
150.000
1.020.000
1.300.000
2.470.000
30/04/2015 30/04/2015
46
15,22%
33.564.000
3.536.000
18.200.000
5.400.000
27.136.000
ADAPTASI PERUBAHAN IKLIM SUMBERDAYA AIR PDAM KABUPATEN ENREKANG South
WORKSHOP PENILAIAN RESIKO
Sulawesi/Eastern
TERHADAP ASET (ARM) DAN
Indonesia
PENYUSUNAN DOKUMEN RENCANA ADAPTASI PERUBAHAN IKLIM SUMBERDAYA AIR PDAM KABUPATEN Pinrang
South
Workshop Penilaian Resiko Terhadap Aset ( Ruang Rapat Bappeda
Sulawesi/Eastern
ARM ) dan penyusunan Adaptasi Perubahan Kabupaten Sidrap
Indonesia
Iklim Sumber Daya Air PDAM
Kabupaten
Sidrap South
Workshop Dalam Rangka Monitoring
Sulawesi/Eastern
Pelaksanaan Pembangunan IPAl-Komunal
Indonesia Workshop (cont')
South
Workshop PENGUATAN POKJA AMPL
Ruang Rapat Kantor
Sulawesi/Eastern
dan UPTD Pengelolaan Air Limbah untuk
Bappeda Kabupaten
Indonesia
Peningkatan Akses Air Limbah Kabupaten
Pinrang
Pinrang South
Workshop Dalam Rangka Monitoring
Sulawesi/Eastern
Pelaksanaan Pembangunan IPAl-Komunal Di Kabupaten Pinrang
Kantor Bappeda
Indonesia
Kabupaten Pinrang Tahun Anggaran 20112014
South
Workshop Penilaian Resiko Terhadap Aset ( Aula Rapat Bappeda
Sulawesi/Eastern
ARM ) dan penyusunan Adaptasi Perubahan Kota Parepare
Indonesia
Iklim Sumber Daya Air PDAM
Kota
Parepare South
Launching, Kampanye dan Sosialisasi
Sulawesi/Eastern
Mekanisme Keterlibatan Masyarakat (Citizen
Indonesia
Engagement Mechanism – CEM) di
Enrekang
Kabupaten Enrekang South
Promosi Sanitasi untuk Masyarakat di Lokasi Mesjid Kelurahan Kasi
Sulawesi/Eastern
IPAL Komunal Kawasan program sAIIG
Indonesia
Kelurahan Kasi-Kasi Kota Makassar
South
Visioning Workshop Program Air Bersih dan Jayapura
Sulawesi/Eastern
Sanitasi Bagi Penentu Kebijakan Kabupaten
Indonesia
Jayapura
Kasi Kota Makassar
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
60
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province
Title
Location
South
Promosi Sanitasi untuk Masyarakat di Lokasi Masjid Kel.
Sulawesi/Eastern
IPAL Komunal Kawasan program sAIIG
Panambungan Kota
Indonesia
Kelurahan Panambungan Kota Makassar
Makassar
South
ToT Kader, Sanitarian Promkes dan UPTD
Hotel SwissBell
Sulawesi/Eastern
PAL untuk Promosi Sanitasi IPAL Komunal
Panakukang makassar
Indonesia
program sAIIG
South
Workshop tentang Studi Kerentanan
Ruang Pertemuan
Sulawesi/Eastern
Sumberdaya Air (CCVA study) dan
PEMDA Kab.
Indonesia
Workshop Penilaian Resiko terhadap Aset
Jeneponto
Starting Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
05/05/2015 05/05/2015
98
33,67%
2.500.000
150.000
1.000.000
700.000
1.850.000
13/05/2015 13/05/2015
51
58,82%
19.900.000
2.208.800
10.250.000
4.300.000
16.758.800
19/05/2015 26/05/2015
18
22,22%
9.980.000
600.000
3.780.000
4.500.000
8.880.000
19/05/2015 21/05/2015
28
78,57%
10.430.000
700.000
3.780.000
3.300.000
7.780.000
Makassasr
26/05/2015 26/05/2015
49
63,27%
19.215.000
1.822.500
7.500.000
4.300.000
13.622.500
28/05/2015 28/05/2015
55
27,27%
19.975.000
951.000
11.900.023
5.100.000
17.951.023
16/3/2015
16/3/2015
20
60,00%
6.384.000
2.248.500
1.680.000
700.000
4.628.500
16/3/2015
16/3/2015
54
29,63%
7.470.000
2.108.500
2.360.000
2.250.000
6.718.500
20/3/2015
20/3/2015
18
33,33%
4.188.000
1.446.500
1.287.000
650.000
3.383.500
(ARM) dan Pembuatan Dokumen Rencana Adaptasi Perubahan Iklim Sumberdaya Air PDAM Untuk wilayah Kabupaten Jeneponto South
Workshop tentang Studi Kerentanan
Ruang Pertemuan
Sulawesi/Eastern
Sumberdaya Air (CCVA study) dan
PEMDA Kab. Bantaeng
Indonesia
Workshop Penilaian Resiko terhadap Aset (ARM) dan Pembuatan Dokumen Rencana Adaptasi Perubahan Iklim Sumberdaya Air PDAM Untuk wilayah Kabupaten Bantaeng
Workshop South (cont') Sulawesi/Eastern
Workshop Monitoring Kemajauan Pelaksanaan Pembangunan IPAL-Komunal
Indonesia
SLBM 2011-2013 Kota Makassar
South
Workshop Evaluasi dan Rencana Tindak
Hotel Clarion Kota
Sulawesi/Eastern
Lanjut Promosi Sanitasi di lokasi IPAL
Makassar
Indonesia
Komunal Kawasan mendukung Program sAIIG bersama Tim Prosinta, Sanitarian, Promkes dan Kader Lingkungan di Kota Makassar
South
Workshop Refreshing dan Sinergi Peran
Sulawesi/Eastern
Keberlanjutan Promosi Sanitasi Kab. Takalar
Indonesia-DKM (Grantee) South
Workshop Sinergi Peran Keberlanjutan
Sulawesi/Eastern
Pengelolaan IPAL Komunal dan MCK ++
Indonesia-DKM
Kab. Takalar
(Grantee) South
Workshop Refreshing dan Sinergi Peran
Sulawesi/Eastern
Keberlanjutan Promosi Sanitasi Kab.
Indonesia-DKM
Bantaeng
(Grantee)
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
61
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province
Title
South
Workshop Sinergi Peran Keberlanjutan
Sulawesi/Eastern
Pengelolaan IPAL Komunal dan MCK ++
Indonesia-DKM
Kab. Bantaeng
Location
Starting Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
20/3/2015
20/3/2015
30
13,33%
5.274.000
1.066.500
1.599.000
900.000
3.565.500
23/3/2015
23/3/2015
34
47,06%
5.896.000
1.185.500
1.880.000
600.000
3.665.500
23/3/2015
23/3/2015
61
27,87%
6.582.000
2.159.500
2.200.000
2.150.000
6.509.500
24/3/2015
24/3/2015
13
61,54%
5.408.000
1.109.500
1.720.000
450.000
3.279.500
24/3/2015
24/3/2015
48
45,83%
6.494.000
1.456.500
2.040.000
1.600.000
5.096.500
04/01/2015 04/01/2015
14
50,00%
3.700.000
843.500
1.160.000
850.000
2.853.500
04/01/2015 04/01/2015
34
26,47%
4.786.000
990.500
1.480.000
1.250.000
3.720.500
04/02/2015 04/02/2015
9
44,44%
3.944.000
881.500
1.240.000
400.000
2.521.500
04/02/2015 04/02/2015
39
41,03%
5.030.000
1.228.500
1.560.000
1.300.000
4.088.500
31/03/2015 31/03/2015
80
45,00%
1.500.000
0
1.350.000
0
1.350.000
(Grantee) South
Workshop Refreshing dan Sinergi Peran
Sulawesi/Eastern
Keberlanjutan Promosi Sanitasi Kota
Indonesia-DKM
Parepare
(Grantee) South
Workshop Sinergi Peran Keberlanjutan
Sulawesi/Eastern
Pengelolaan IPAL Komunal dan MCK ++
Indonesia-DKM
Kota Parepare
(Grantee) South
Workshop Refreshing dan Sinergi Peran
Sulawesi/Eastern
Keberlanjutan Promosi Sanitasi Kab. Pinrang
Indonesia-DKM (Grantee)
Workshop (cont')
South
Workshop Sinergi Peran Keberlanjutan
Sulawesi/Eastern
Pengelolaan IPAL Komunal dan MCK ++
Indonesia-DKM
Kab. Pinrang
(Grantee) South
Workshop Refreshing dan Sinergi Peran
Sulawesi/Eastern
Keberlanjutan Promosi Sanitasi Kab. Sidrap
Indonesia-DKM (Grantee) South
Workshop Sinergi Peran Keberlanjutan
Sulawesi/Eastern
Pengelolaan IPAL Komunal dan MCK ++
Indonesia-DKM
Kab. Sidrap
(Grantee) South
Workshop Refreshing dan Sinergi Peran
Sulawesi/Eastern
Keberlanjutan Promosi Sanitasi Kab.
Indonesia-DKM
Jeneponto
(Grantee) South
Workshop Sinergi Peran Keberlanjutan
Sulawesi/Eastern
Pengelolaan IPAL Komunal dan MCK ++
Indonesia-DKM
Kab. Jeneponto
(Grantee) National
Sosialisasi Ketentuan program Master Meter Pulogebang di Pulogebang-Jakarta Timur
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
62
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province
Title
West
Kearifan Lokal dalam Adaftasi Iklim. Serta
Java/Banten/DKI
Manfaatnya untuk Masyarakat, Dunia Usaha,
Jakarta
dan Pemerintah” KERJASAMA TIM TSP KAB
Location
Starting Date
End Date Participants % Female Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
kab Serang
07/05/2015 07/05/2015
49
55,10%
46.956.000
0
20.559.991
0
20.559.991
Hotel Grand Imawan,
31/3/2015
31/3/2015
80
35,00%
21.622.000
2.936.300
13.135.000
11.700.000
27.771.300
19/12/2013 19/12/2013
51
43,14%
9.800.000
3.050.000
3.400.000
150.000
6.600.000
SERANG, PEMKAB DAN IUWASH Seminar South
Multi Cities Seminar (Closing Program in
Sulawesi/Eastern
Bantaeng, Jeneponto, Takalar, Makassar, Pare- Makassar
Indonesia-DKM
pare, Pinrang and Sidrap)
(Grantee)
Study
Central Java-GITA
Studi Banding Program Septic Tank Komunal Desa Cepoko, Sawit,
PERTIWI (Grantee)
Desa Cepoko, Sawit, Boyolali
Boyolali
Central Java-GITA
Studi Banding Pembangunan Septic Tank
Kabupaten Kendal
30/01/2014 30/01/2014
10
20,00%
0
1.450.000
384.000
0
1.834.000
PERTIWI (Grantee)
Komunal di Kendal
East Java
Comparative Study on reduction of water
Kota Malang
18/03/2015 18/03/2015
27
7,41%
8.600.000
4.970.000
3.788.500
0
8.758.500
22/02/2015 26/02/2015
25
20,00%
143.330.000
9.775.000
87.061.050
25.090.428
121.926.478
Kab. Lebak
09/03/2015 13/03/2015
309
60,84%
17.400.000
1.994.500
4.648.000
2.600.000
9.242.500
Kota Bekasi
28/03/2015 28/03/2015
104
60,58%
7.940.000
2.534.125
2.325.000
1.800.000
6.659.125
Kabupaten Purwakarta 23/04/2015 23/04/2015
12
33,33%
24.150.000
0
800.000
0
800.000
Kota Bekasi
43
11,63%
9.225.000
2.100.000
970.000
5.550.000
8.620.000
lossess and management of water meters
Tour
PDAM Sidoarjo to PDAM iKota Malang South
Kunjungan Kerja Komisi Watsan dan Badan
Kota Solo, Kota
Sulawesi/Eastern
Legislasi Daerah - Balegda DPRD untuk
Denpasar, Kabupaten
Indonesia
Percepatan Regulasi Air Limbah Domestik
Tabanan
Kota Makassar West
“Capacity Building KSM SANIMAS”
Java/Banten/DKI
Peningkatan Kapasitas Kelompok Pengguna
Jakarta
dan Pemanfaat serta Promosi Hygiene bagi pengguna Sarana Sanitasi di Kabupaten Lebak (tahap I)
Advocacy Event
West
“Capacity Building KSM SANIMAS”
Java/Banten/DKI
Peningkatan Kapasitas Kelompok Pengguna
Jakarta
dan Pemanfaat serta Promosi Hygiene bagi pengguna Sarana Sanitasi di Kota Bekasi
West
Peresmian Website PDAM Kabupaten
Java/Banten/DKI
Purwakarta
Jakarta West
Sosialisasi Perwal UPTD PALD kepada Staff
Java/Banten/DKI
UPTD IPLT
23/04/2015 23/04/2015
Jakarta
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
63
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province Central Java
Title
Location
Dokumentasi Kunjungan Duta Besar Amerika Desa Patemon, Serikat Dalam Rangka Peresmian Sumur
Starting Date
End Date Participants % Female Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
19/03/2015 19/03/2015
9
55,56%
4.000.000
2.000.000
2.000.000
0
4.000.000
31/03/2015 31/03/2015
210
22,38%
6.100.000
350.000
4.106.250
3.100.000
7.556.250
Kabupaten Semarang
Resapan Central Java
Advocacy Event (cont')
Peletakan Batu Pertama Pembangunan Sumur Desa Bismo Resapan dan Penyerahan Program CSR
Kecamatan Blado -
Batang
Batang
Central Java-GITA
Sosialisasi Program Hibah Septic Tank
Balai Desa Jomblang
24/10/2013 24/10/2013
10
30,00%
2.600.000
600.000
317.000
100.000
1.017.000
PERTIWI (Grantee)
Komunal dengan Satkeholder
Central Java-GITA
Sosialisasi Program Hibah Septic Tank
Kantor RW XI
01/11/2013 01/11/2013
11
45,45%
450.000
600.000
507.650
0
1.107.650
PERTIWI (Grantee)
Komunal dengan Masyarakat
Jomblang
Central Java-GITA
Sosialisasi Program Hibah Septic Tank
Kantor RW XI
09/12/2013 09/12/2013
17
23,53%
450.000
2.500
250.000
0
252.500
PERTIWI (Grantee)
Komunal Tingkat RW
Jomblang
Central Java-GITA
Sosialisasi Program Hibah Septic Tank
Kantor RW XI
09/12/2013 09/12/2013
24
16,67%
450.000
32.500
600.000
0
632.500
PERTIWI (Grantee)
Komunal Tingkat RW
Jomblang
Central Java-GITA
Sosialisasi Teknis Program Hibah Septic Tank Kantor RW XI
02/04/2014 02/04/2014
48
35,42%
2.700.000
205.000
2.000.000
0
2.205.000
PERTIWI (Grantee)
Komunal
22/04/2014 22/04/2014
11
27,27%
1.450.000
753.200
0
550.000
1.303.200
23/04/2014 23/04/2014
13
23,08%
2.650.000
224.900
400.000
634.000
1.258.900
09/05/2014 09/05/2014
19
21,05%
2.650.000
530.750
0
550.000
1.080.750
07/04/2015 07/04/2015
47
29,79%
14.340.000
1.325.000
5.940.000
5.650.000
12.915.000
Jomblang
Central Java-KOMPIP Konsultatif Meeting dengan PDAM Kab.
Kantor PDAM
(Grantee)
Kab.Sukoharjo
Sukoharjo
Central Java-KOMPIP Konsultatif Meeting dengan PDAM Kab.
Kantor PDAM
(Grantee)
Kab.Batang
Batang
Central Java-KOMPIP Konsultatif Meeting dengan PDAM Kab.
Kantor PDAM
(Grantee)
Klaten
Kab.Klaten
South
Workshop Advokasi Pemerintah Kota dan
Hotel Amaris Ambon
Sulawesi/Eastern
UPTD PAL untuk mengetahui Progres
Indonesia
Pembangunan dan Pengelolaan IPAL Komunal Skala Kawasan
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
64
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Type
Province Central Java
Title
Location
Dokumentasi Kunjungan Duta Besar Amerika Desa Patemon, Serikat Dalam Rangka Peresmian Sumur
Starting Date
End Date
Participants % Female
Budget (Rp)
Actual Cost Instruction
Trainee
Travel
Total
19/03/2015 19/03/2015
9
55,56%
4.000.000
2.000.000
2.000.000
0
4.000.000
31/03/2015 31/03/2015
210
22,38%
6.100.000
350.000
4.106.250
3.100.000
7.556.250
Kabupaten Semarang
Resapan Central Java
Peletakan Batu Pertama Pembangunan Sumur Desa Bismo Resapan dan Penyerahan Program CSR
Kecamatan Blado -
Batang
Batang
Central Java-GITA
Sosialisasi Program Hibah Septic Tank
Balai Desa Jomblang
24/10/2013 24/10/2013
10
30,00%
2.600.000
600.000
317.000
100.000
1.017.000
PERTIWI (Grantee)
Komunal dengan Satkeholder
Central Java-GITA
Sosialisasi Program Hibah Septic Tank
Kantor RW XI
01/11/2013 01/11/2013
11
45,45%
450.000
600.000
507.650
0
1.107.650
PERTIWI (Grantee)
Komunal dengan Masyarakat
Jomblang
Central Java-GITA
Sosialisasi Program Hibah Septic Tank
Kantor RW XI
09/12/2013 09/12/2013
17
23,53%
450.000
2.500
250.000
0
252.500
PERTIWI (Grantee)
Komunal Tingkat RW
Jomblang
Central Java-GITA
Sosialisasi Program Hibah Septic Tank
Kantor RW XI
09/12/2013 09/12/2013
24
16,67%
450.000
32.500
600.000
0
632.500
PERTIWI (Grantee)
Komunal Tingkat RW
Jomblang
Central Java-GITA
Sosialisasi Teknis Program Hibah Septic Tank Kantor RW XI
02/04/2014 02/04/2014
48
35,42%
2.700.000
205.000
2.000.000
0
2.205.000
PERTIWI (Grantee)
Komunal
22/04/2014 22/04/2014
11
27,27%
1.450.000
753.200
0
550.000
1.303.200
23/04/2014 23/04/2014
13
23,08%
2.650.000
224.900
400.000
634.000
1.258.900
09/05/2014 09/05/2014
19
21,05%
2.650.000
530.750
0
550.000
1.080.750
Jomblang
Central Java-KOMPIP Konsultatif Meeting dengan PDAM Kab.
Kantor PDAM
(Grantee)
Kab.Sukoharjo
Sukoharjo
Advocacy Central Java-KOMPIP Konsultatif Meeting dengan PDAM Kab. Batang Event (Grantee)
Kantor PDAM
Central Java-KOMPIP Konsultatif Meeting dengan PDAM Kab.
Kantor PDAM
(Grantee)
Klaten
Kab.Klaten
South
Workshop Advokasi Pemerintah Kota dan
Hotel Amaris Ambon
07/04/2015 07/04/2015
47
29,79%
14.340.000
1.325.000
5.940.000
5.650.000
12.915.000
Sulawesi/Eastern
UPTD PAL untuk mengetahui Progres
Indonesia
Pembangunan dan Pengelolaan IPAL 09/04/2015 09/04/2015
36
41,67%
14.790.000
2.025.000
7.050.000
2.650.000
11.725.000
20/04/2015 21/04/2015
29
44,83%
12.625.000
75.000
1.600.000
400.000
2.075.000
26/05/2015 26/05/2015
31
32,26%
9.700.000
6.500.000
300.000
1.450.000
8.250.000
(cont')
Kab.Batang
Komunal Skala Kawasan South
Workshop Advokasi Pemerintah Kota dan
Hotel Santika Kota
Sulawesi/Eastern
UPTD PAL untuk mengetahui Progres
Makassar
Indonesia
Pembangunan dan Pengelolaan IPAL Komunal Skala Kawasan & Sosialisasi DED IPLT Kabupaten Maros
South
PROMOSI DAN PEMASARAN
Sulawesi/Eastern
PERCEPATAN SAMBUNGAN AIR BERSIH Sidrap
Kelurahan Amparitta,
Indonesia
SKEMA KREDIT MIKRO PDAM Sidrap, Forum Komunikasi Pelanggan dan Koperasi Denas 66 Sidrap, 20-21 April 2015
South
Talk Show Program Kredit “Murah” Jamban
Ruang Rapat Bupati
Sulawesi/Eastern
Sehat
Pinrang
Indonesia
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
65
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
Section 7
STATUS OF IUWASH POLICY DEVELOPMENT SUPPORTED WATSAN SECTOR STATUS: JUNE 2015 1.1 = 1.2 = 1.3 =
No Location
Policy Name
2.1 = 3.1= 3.2 = 3.3 = 4.1 = 4.2 =
1.1
1
2
3
Kota Binjai
Kota Medan
Kota Tebing Tinggi
Steps of Framework of Policy Development
Policy identification on watsan (existing) Compare the existing policies on watsan and improvement needed if any Facilitate stakeholders on potential policy amendment or having new policy and determine the priority Coordinate with LG to form a team (LG agencies, POKJA AMPL, PDAM) to develop new policy/ improve policy Facilitate the team to process the policy amendment/develop new policy – conduct problem analysis supported policy development Prepare the outline of the new/amended policy Present the final draft to relevant stakeholders Conduct socialization of new policy to LG agencies Approval and signing the new/amended policy by Bupati/Mayor
1.2
1.3
Peraturan Walikota (Mayor Regulation) on Domestic Wastewater Management Peraturan Walikota No. 32/2014 on Organisasi dan Tata Kerja UPT TPA/Pengelolaan Sampah (which also cover wastewater management task) Peraturan Walikota (Mayor Regulation) for Establishment of Citizen Engagement Mechanism Peraturan Walikota on Acceleration of Offsite System Development (Percepatan Pengembangan Sistem Pengelolaan Air Limbah Terpusat) SK Walikota on Pengesahan Business Plan PDAM Tirta Bulian Tebing Tinggi 2013-2017 Peraturan Walikota on Citizen Engagement Mechanism
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
2.1
3.1
3.2
3.3
4.1
Remark
4.2
Signed on 31 Oct 2014, reported on 16 Feb 2015 Signed on 20 Oct 2014
Signed on 12 May 2014.
Already signed on 26 May 2014
New proposed policy by NSRO Team
66
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
4
5
Kota Pematang Siantar
Kota Tanjungbalai
6
Kab. Langkat
7.
Kota Sibolga
Peraturan Walikota No. 28/2014 on second revision onto Perwal No. 16/2009 on UPTD (which include Domestic Wastewater Management task) Peraturan Walikota No. 29/2014 on Diomestic Wastewater Management Surat Keputusan Walikota (Mayor Decree) on Drinking Water Tariff for Pematang Siantar Peraturan Walikota Tentang CCVA (Raw Water Protection) Surat Keputusan Walikota (Mayor Decree) of Local Government Equity Transfer to PDAM Surat Keputusan Walikota (Mayor Decree) of Business Plan PDAM Peraturan Walikota No. 18/2014 on Domestic Wastewater Management Peraturan Walikota No. 19/2014 on the Establishment of a Waste Management Unit (UPTD) Peraturan Walikota (Mayor Regulation) for Establishment of Citizen Engagement Mechanism. Surat Keputusan Bupati (District Head Decree) of Business Plan. Peraturan Bupati (District Head Regulation) for Establishment of Citizen Engagement Mechanism. Peraturan Walikota Tentang CCVA (Raw Water Protection) Peraturan Walikota on Domestic Wastewater Management
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
Signed on 11 Nov 2014
Signed on 11 Nov 2014 Policy formally issued on 5 July 2013
The regulation was signed on 12 August 2013 Signed on 1 November 2013 Already signed on 28 October 2014 Already signed on 28 October 2014
Already signed on 24 Sept 2014
Policy substance (Business Plan) is in process. Policy drafting will be started in early PY 5 Signed on 10 Dec 2014, reported on 19 March 2015
67
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
8.
9.
10.
11
Kab. Asahan
Kab. Labuhanbatu
Kota Bogor
Kab. Karawang
Peraturan Bupati (District Head Regulation) on Domestic Wastewater Management Peraturan Bupati (Head District Regulation) on the Establishment of a Waste Management Unit (UPTD) Peraturan Bupati (District Head Regulation) for Establishment of Citizen Engagement Mechanism. Peraturan Bupati No. 24/2014 on Organisasi dan Tata Kerja Pejabat (Organization and Work Procedure of responsible Authorities for Information and Documentation) Perda No. 16 Tahun 2011 tentang Perusahaan Daerah Air Minum (PDAM) Tirta Pakian Kota Bogor Perda no. 17 Tahun 2012 tentang Pengelolaan Perusahaan Daerah Air Minum (PDAM) Tirta Pakuan Bogor Perda No. 20 Tahun 2011 tentang Perubahan atas Perda Kota Bogor No. 7 Tahun 2010 tentang Penyertaan Modal Daerah kepada PDAM Tirta Pakuan, PD BPR Bank Pasar, PD Jasa Transportasi dan PD Pasar Pakuan Jaya Kota Bogor Peraturan Daerah on Waste Water Management Surat Keputusan Walikota (Mayor decree) on the Organizational Structure of the PDAM. Surat Keputusan Bupati (District Head Decree) on Tariff Adjustment.
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
Waiting for signing from the Mayor
Signed on 3 Dec 2014, reported on 6 Feb 2015 Signed on 20 Oct 2014, reported on 18 feb 2015 Already signed on 24 July 2014
Signed on 7 December 2011
Signed on 7 December 2011
Signed on 20 December 2011
Academic paper and draft Ranperda have been discussed with related SKPDs Waiting for the signed document
Waiting for the result of Census of Customer classification conducted in 2014.
68
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
12
Kota Bekasi
13
Kab. Bekasi
14
Kab. Purwakarta
15
16
17
Kab. Bandung
Kab. Serang
Kab. Lebak
Peraturan Bupati No. 30/2014 on Rencana Induk SPAM (RISPAM) Revision of Mayor Regulation on Establishment and Organization Structure of UPTD within Public Work sector Mayor Regulation on Community Based Total Sanitation Mayor Regulation on Minimum Service Standard PDAM Tirta Patriot Peraturan Bupati (District Head Regulation) on the Establishment of a Waste Management Unit (UPTD). Surat Keputusan Bupati (District head decree) for Tariff Adjustment PDAM. Peraturan Bupati (District Head Regulation) on the Establishment of a Waste Management Unit (UPTD). Peraturan Bupati on Rencana Induk SPAM (RISPAM). Peraturan Bupati (District Head Regulation) on Community-Based Total Sanitation Peraturan Bupati (District Head Regulation) on the Regionalization of Water Supply. Raw Water Protection
Already signed on 4 August 2014
Peraturan Bupati (District Head Regulation) on the Establishment of a Waste Management Unit (UPTD). SK Bupati on Tariff Adjustment Peraturan Bupati on UPTD Pengelolaan Air Limbah
The regulation was signed on 9 October 2013
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
Signed on April 2015
Signed on 4 Nov 2014, reported on 15 Jan 2015 Signed on 31 Dec 2014, reported on March 2015 Final, signed on 16 Dec 2013
Signed on 15 Jan 2015, reported on 12 Feb 2015. Delayed. Still waiting for PERBUB drafter formation and Dispertasih as responsible authorities. Signed on 30 June 2014 Signed on 11 September 2014
Preliminary discussion with local government for need of regulation. Postponed. .
Ongoing Process Waiting for signing Bupati
69
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
18
19
20
21
Kab. Tangerang
Kota Tangerang Selatan
Kota Semarang
Kota Surakarta
Peraturan Bupati No. 28/2014 on the Establishment of a Waste Management Unit (UPTD). Peraturan Walikota (Mayor Regulation) of Regionalization of Raw Water Supplies. Peraturan Walikota (Mayor Regulation) on the Establishment of a Waste Management Unit (UPTD). Peraturan Walikota (Mayor Regulation) on the Actions Plan of the LG for Water Supply and Environmental Management. Peraturan Walikota (Mayor Regulation) for Community Based of Water and Sanitation Management. Peraturan Walikota (Mayor Regulation) on the Establishment of a Waste Management Unit (UPTD). Peraturan Walikota No. 31/2014 (Mayor Regulation) on Pusat Pengelolaan Pengaduan Masyarakat (CEM). Surat Keputusan Walikota (Mayor decree) for Sludge Collection and Wastewater Tariff.
Surat Keputusan Walikota (Mayor decree) for Slum Area Location and City Sanitation Development. Peraturan Walikota No. 16A/2014 (Mayor Regulation) on Sludge Management
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
Signed on 18 Feb 2014
Discussion for need of regulation was conducted in PY3. Postponed. Draft final will be discussed
Policy completed and issued on 28 December 2012.
Policy complete and issued December 2013 Postponed till revision of Perda SOTK in 2015 Already signed on 6 Oct 2014
Intensive discussions with local stakeholders were conducted. Tariff formulation is in the process. Final by Mayor approval to be completed in June 2014. Policy completed and issued on 28 May 2012 Already signed on 13 August 2014
70
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
22
23
24
25
26
27
Kab. Kudus
Kab. Kendal
Kab Semarang
Kota Salatiga
Kab. Rembang
Kab. Sukoharjo
Peraturan Bupati (District Head Regulation) on the Establishment of a Waste Management Unit (UPTD). Peraturan Bupati (District Head Regulation) for Citizen Engagement Mechanism. Peraturan Bupati (District Head Regulation) for Water Supply and Environmental Health Action Plan. Peraturan Daerah (Perda) for Local Government Equity Transfer to the PDAM. Peraturan Bupati (District Head Regulation) on the Establishment of a Waste Management Unit (UPTD). Perda Penyertaan Modal Daerah pada PDAM Raw Water Protection Peraturan Bupati (District Head Regulation) on the Establishment of a Waste Management Unit (UPTD). Raw Water Protection Peraturan Bupati (District Head Regulation) on the Establishment of a Waste Management Unit (UPTD). Peraturan Daerah (Perda) for Local Government Equity Transfer to the PDAM Peraturan Bupati (District Head Regulation) on the Establishment of a Waste Management Unit (UPTD). Peraturan Bupati (District Head Regulation) for Establishment of Citizen Engagement Mechanism.
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
Waiting for signing from the Regent
Policy completed and issued in January 2013. Final and issued in September 2012.
Already signed on 23 April 2013 Waiting from the initial result of CCVA study Final draft submitted to Bagian Hukum
Newly proposed. Final by Bupati approval on 4 April 2014
Final by Bupati approval on 4 September 2013. Final. Approved by Bupati on 27 December 2013. Waiting for signing Bupati
71
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
28
29
30
31
32
Kab. Klaten
Kab. Batang
Kab. Sidoarjo
Kab. Gresik
Kab. Lamongan
Peraturan Bupati (District Head Regulation) for PDAM customer reclassification. Peraturan Bupati (District Head Regulation) for Citizen Engagement Mechanism. Peraturan Bupati (District Head Regulation) on the Establishment of a Wastewater Management Unit (UPTD). Peraturan Bupati (District Head Regulation) on Tupoksi of a Wastewater Management Unit (UPTD). Peraturan Bupati (District Head Regulation) for PDAM Organizational Structure. Peraturan Bupati (District Head Regulation) for Establishment of Waste Management Unit. Peraturan Bupati (District Head Regulation) of CEM development Peraturan Bupati (District Head Regulation) on the Establishment of a Wastewater Management Unit (UPTD). Surat Keputusann Bupati (District head decree) on PDAM Tariff Adjustment. Peraturan Bupati (District Head Regulation) of CEM development Peraturan Bupati (District Head Regulation) on the Establishment of a Wastewater Management Unit (UPTD).
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
Signed on 8 Dec 2014, reported on 12 Jan 2015 Signed on 22 August 2014
Final. Approved by Bupati on 25 October 2013.
Final. Signed in March 2014.
Final. Approved by Bupati on 16 December 2013. Final Approval by Bupati on 9 December 2013 Signed on March 2015 Final, approved by Bupati on 31 December 2013.
Final, approved by Bupati on 18 October 2013. Draft final of Perbup is being revised and sub,itted to bagian Hukum Signed on 3 Feb 2015, reported on 8 March 2015
72
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
33
34
35
36
Kota Probolinggo
Kab. Probolinggo
Kab. Mojokerto
Kota Mojokerto
Peraturan Bupati for Rencana Induk SPAM (RISPAM) Kabupaten Lamongan. Peraturan Daerah No. 4/2014 on Pengelolaan Air Limbah Domestik Peraturan Walikota (Mayor Regulation) on raw water protection Peraturan Bupati (District Head Regulation) on Revision of Old Perbup on Uraian Tugas dan Fungsi BLH (wastewater management) Peraturan Bupati (District Head Regulation) of CEM development Peraturan Bupati on Raw water Protection Peraturan Daerah on Raw Water Protection. Peraturan Bupati (District Head Regulation) on the Establishment of a Wastewater Management Unit (UPTD). Peraturan Bupati on Tupoksi Organisasi dan Tata Kerja Dinas Pekerjaan Umum Cipta Karya dan Tata Ruang Peraturan Bupati (District Head Regulation) of CEM development Peraturan Walikota (Mayor Regulation) on the Establishment of a Wastewater Management Unit (UPTD). Surat Keputusan Walikota (Mayor Regulation) on PDAM Business Plan STBM
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
Final. Signed on 30 May 2014. Preliminary by discussion with local government for a need to develop regulation. CCVA study is completed. Signed on 3 November 2014
Signed 20 Nov 2014, reported on 23 Jan 2015 Estimate final Approval , March 2015 Waiting for sigining Bupati Final, approved by Bupati in on 6 January 2014.
Final, approved by Bupati in on 2 January 2014.
Signed on 27 April 2015 Just decided the nomenclature of institution
Signed on 3 Dec 2014, reported on 22 Jan 2015 Signed on 2 Jan 2015, reported on April 2015
73
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
37
38
39
40
41
Kab. Jombang
Kota Malang
Kab. Malang
Peraturan Bupati (District Head Regulation) on the Establishment of a Wastewater Management Unit (UPTD). Peraturan Walikota (Mayor Regulation) for Raw Water Protection. Peraturan Walikota (Mayor Regulation) of Rencana Induk SPAM (RISPAM) Kota Malang Peraturan Walikota (Mayor Regulation) for Raw Water Protection. Peraturan Bupati (District Head Regulation) on the Establishment of a Wastewater Management Unit (UPTD). Peraturan Bupati (District Head Regulation) for Raw Water Protection. Peraturan Daerah (Local Law) on Raw Water Protection.
Kota Batu
Kota Makassar
Peraturan Walikota (Mayor Regulation) on the Establishment of a Waste Management Unit (UPTD). Peraturan Perda (Perda) on the Establishment of a Waste Management Unit (UPTD). Mayor regulation on Domestic Wastewater Management Mayor Regulation on Procedures for Granting Waivers Levy Reduction and Management Services for wastewater services
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
Signed and released in March 2014
Preliminary by discussion with local government for a need to develop regulation. CCVA is in underway for preparation. April 2015 Already signed on 2 February 2014
CCVA is completed, ready for policy formulation Technical review of the preliminary draft by local authorities
Signed on 15 April 2015
Preliminary stage by discussion with local government for a need to develop regulation. CCVA is in underway for preparation. April 2015 Formally issued in May 2014.
Draft final of ranperda has been discussed and submitted to Bagian Hukum for final review New policy (just reported) New policy (just reported)
74
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
42
43
44
45
46
47
Kab. Takalar
Kab. Maros
Kab. Jeneponto
Kab. Bantaeng
Kota Parepare
Kab. Enrekang
Peraturan Bupati (District Head Regulation) for Citizen Engagement Mechanism. Peraturan Bupati (District Head Regulation) of Local Government Equity Transfer to PDAM. Peraturan Bupati (District Head Regulation) on the Establishment of a Waste Management Unit (UPTD). Peraturan Bupati (District Head Regulation) for Citizen Engagement Mechanism. Perbup on Raw Water Protection Peraturan Bupati (District Head Regulation) for Citizen Engagement Mechanism. Peraturan Bupati (District Head Regulation) on the Establishment of a Wastewater Management Unit (UPTD). Peraturan Walikota (Mayor Regulation) on Raw Water Protection. Peraturan Walikota (Mayor Regulation) on the Establishment of a Waste Management Unit (UPTD). Peraturan Walikota (Mayor Regulation) for Citizen Engagement Mechanism. Peraturan Bupati (District Head Regulation) on Raw Water Protection. Peraturan Bupati (District Head Regulation) for Citizen Engagement Mechanism.
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
Signed already on 4 August 2014
Policy completed and issued on 5 September 2013. Policy issued in May 2014.
Policy completed and issued on 21 May 2013. Will start in PY 5 CEM option has been selected. Start to draft the regulation The regulation was signed on 27 March 2014
Preliminary steps conducted awaiting CCVA study. Signed in May 2014.
Policy completed and issued on 9 October 2012. Preliminary steps conducted awaiting CCVA study. Policy completed and issued in May 2014.
75
IUWASH PMP ANNEX OF QPR 17 APRIL - JUNE 2015
48
Kab. Sidrap
59
Kab. Pinrang
50
Kota Ambon
51
52
Kab. Jayapura
Kota Jayapura
Peraturan Bupati (District Head Regulation) on Raw Water Protection. Peraturan Bupati Drinking water Tariff PDAM Peraturan Bupati (District Head Regulation) on Raw Water Protection. Peraturan Bupati (District Head Regulation) on the Establishment of a Wastewater Management Unit (UPTD). Peraturan Walikota (Mayor Regulation) on the Establishment of a Waste Management Unit (UPTD). Peraturan Bersama Bupati Jayapura No. 46/2014 dan Walikota Jayapura No. 3/2014 (Mutual District Heads Regulation) on penertiban terhadap pengguna/pemakai air minum secara tidak sah pada PDAM Jayapura (Illegal Connection). Peraturan Bersama Bupati Jayapura No. 46/2014 dan Walikota Jayapura No. 3/2014 (Mutual District Heads Regulation) on penertiban terhadap pengguna/pemakai air minum secara tidak sah pada PDAM Jayapura (Illegal Connection). Peraturan Walikota (Mayor Regulation) on the Establishment of a Waste Management Unit (UPTD).
USAID INDONESIA URBAN WATER SANITATION AND HYGIENE WWW.IUWASH.OR.ID
Preliminary steps conducted awaiting CCVA study. New, just reported. Signed on 30 June 2014 Preliminary steps conducted awaiting CCVA study. Policy completed and issued on 27 December 2013.
Policy completed and issued on 30 September 2013. Signed on 8 Sept 2014
Signed on 8 Sept 2014
Signed on 27 September 2013
76