PERKEMBANGAN PENGELOLAAN KEWAJIBAN KONTINJENSI TRIWULAN I TAHUN 2016 A. POSISI OUTSTANDING & EKSPOSUR KEWAJIBAN PENJAMINAN PEMERINTAH (PER 31 MARET 2016) 1. Program Penjaminan berdasarkan Jenis Penjaminan: No
Rincian Program Penjaminan
Pihak Terjamin
Penjaminan Yang Diterbitkan Jumlah Nilai Pinjaman/ Investasi (miliar) Surat Original Curr. Eq. IDR
Posisi Outstanding per 31 Des 2015 (miliar) per 31 Mar 2016 (miliar) Original Curr. Eq. IDR Original Curr. Eq. IDR
A. PENJAMINAN KREDIT 1. Coal Power Plant 10.000MW Fast Track Program (FTP 1) 2. Clean Water Availability 3. SOE's Direct Lending from International Financial Institution 4. Sumatera Toll Roads Project
PDAM
11 25 11
PT PLN (Persero)
1
USD 0.60
IDR 7,965.60
PT Hutama Karya
2
IDR 1,721.34 USD 3.96 IDR 36,007.04
IDR 1,721.34
PT PLN (Persero)
Total Penjaminan Kredit
No
50
Rincian Program Penjaminan
Pihak Terjamin
USD 3.96 IDR 35,678.74 IDR 328.30
IDR 52,572.96 IDR 35,678.74 IDR 328.30
IDR 98,266.94
Penjaminan Yang Diterbitkan Jumlah Nilai Pinjaman/ Investasi (miliar) Surat Original Curr. Eq. IDR
USD 2.74 IDR 18,975.76 IDR 163.24 USD 2.74 IDR 19,138.99
IDR 37,765.64 IDR 18,975.76 IDR 163.24
USD 2.66 IDR 17,700.55 IDR 164.04
IDR 35,306.98 IDR 17,700.55 IDR 164.04
-
USD 0.12
IDR 1,593.12
-
USD 2.78 IDR 17,864.58
IDR 56,904.63
IDR 54,764.68
Posisi Eksposur per 31 Des 2015 (miliar) per 31 Mar 2016 (miliar) Original Curr. Eq. IDR Original Curr. Eq. IDR
B. PENJAMINAN INVESTASI 1. Renewable energy, Coal and Gas Power Plant 10.000MW Fast Track Program (FTP 2) 2. Public-Private Partnerships Project (PPP)/KPBU/KPS) Total Penjaminan Investasi
PT PLN (Persero) PT PLN (Persero)
Total Penjaminan asumsi kurs (IDR/USD1)
9
USD 4.95
IDR 65,716.20
1
USD 3.20
IDR 42,483.20
10
USD 8.15
IDR 108,199.40
60
-
-
USD 0.00
IDR 206,466.34 IDR 13,276.00
-
IDR 0.00
-
USD 0.00
IDR 56,904.63 IDR 13,795.00
IDR 0.00 IDR 54,764.68 IDR 13,276.00
Keterangan: Posisi outstanding pada penjaminan kredit merupakan sisa pokok pinjaman atau (jumlah penarikan dikurangipembayaran pokok pinjaman). Posisi eksposur pada penjaminan investasi merupakan akumulasi realisasi investasi hingga periode berkenaan. Sampai dengan per 31 Maret 2016, belum terdapat eksposur dalam penjaminan investasi karena proyek belum tercapai target financial close, sebagai syarat efektifnya penjaminan
2. Komposisi Nilai Total Penjaminan Pemerintah berdasarkan Jenis Mata Uang dan Jenis Proyek IDR, 18.27%
Jenis Proyek
Jenis Mata Uang
FTP I, 42.74%
FTP II, 31.83%
KPBU, 20.58%
USD (eq. IDR), 81.73%
PDAM, 0.16% Tol Sumatera, 0.83%
Direct Lending, 3.86%
Page 1 of 5
3. Komposisi Outstanding Penjaminan Kredit berdasarkan Jenis Mata Uang, Lender, Tenor dan Tingkat Bunga Jenis Tenor
Jenis Mata Uang < 10 thn, 10.42%
>= 10 thn dan <= 13 thn, 75.00%
USD (eq. IDR), 67.38%
IDR, 32.62%
> 13 thn, 14.58% Bank BPD, 20.41%
Bank Swasta (DN), 24.49%
Jenis Lender
Bank BUMN (DN), 30.61% Bank Swasta (LN), 24.49%
Jenis Tingkat Bunga
Floating 100%
4. Proyeksi Jatuh Tempo Pokok Pinjaman yang di jamin Pemerintah Pusat berdasarkan Jenis Proyek per Jenis Mata Uang
Keterangan: Maturity profile berdasarkan proyeksi pembayaran pokok pinjaman proyek FTP 1, Direct lending, dan PDAM, sedangkan Tol Sumatera belum ada penarikan. Kredit pinjaman untuk Program Direct Lending dalam masa grace period hingga 2020. Beberapa PDAM yang belum merealisasikan penarikan pinjaman Proyek Penyediaan Air Minum (PDAM Giri Menang, Cilacap, Banyumas dan Buleleng)
Page 2 of 5
B. RINCIAN PROYEK PER PROGRAM KEWAJIBAN PENJAMINAN PEMERINTAH (PER 31 MARET 2016) 1. Proyek Percepatan Pembangunan Pembangkit Tenaga Listrik Yang Menggunakan Batubara (10.000 MW Tahap 1 (Fast Track Program/FTP 1)) Proyek Pembangkit FTP 1 untuk Mata Uang Rupiah (IDR) NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
PLTU PLTU 2 Banten PLTU 1 Jabar PLTU 1 Jateng PLTU 1 Banten PLTU 2 Jatim PLTU 1 Jatim PLTU 3 Banten PLTU 2 Jabar PLTU Lampung PLTU 2 Sumut PLTU 2 NTB PLTU Gorontalo PLTU 2 Sulut PLTU 1 Kepri PLTU 1 NTT PLTU Sultra PLTU 1 Kalteng PLTU 3 Jatim PLTU NAD PLTU Sumbar PLTU 2 NTT PLTU 4 Babel PLTU 1 NTB PLTU 2 Kalbar PLTU Malut PLTU 1 Riau PLTU 2 Riau PLTU 1 Kalbar PLTU Sulsel PLTU 3 Babel PLTU 2 Papua PLTU Kalsel PLTU Kaltim PLTU Riau PLTU Maluku PLTU 1 Papua
LOKASI Labuan Indramayu Rembang Suralaya Paiton Pacitan Teluk Naga/Lontar Pelabuhan Ratu Tarahan Pangkalan Susu Lombok Anggrek Amaurang Tj Balai karimun Ende Kendari Pulang Pisau Tanjung Awar-Awar Meulaboh Teluk Sirih Kupang Belitung Bima Bengkayang Tidore Bengkalis Selat Panjang Parit Baru Barru Bangka Baru Jayapura Baru Asam-asam Teluk Balikpapan Tenayan Ambon Timika TOTAL
PROYEK KAPASITAS (MW) x 315 = 630 x 330 = 990 x 315 = 630 x 625 = 625 x 660 = 660 x 315 = 630 x 315 = 945 x 350 = 1050 x 100 = 200 x 200 = 400 x 25 = 50 x 25 = 50 x 25 = 50 x 7 = 14 x 7 = 14 x 10 = 20 x 60 = 120 x 350 = 700 x 110 = 220 x 112 = 224 x 16.5 = 33 x 16.5 = 33 x 10 = 20 x 27.5 = 55 x 7 = 14 x 10 = 20 x 7 = 14 x 50 = 100 x 50 = 100 x 30 = 60 x 10 = 20 x 65 = 130 x 110 = 220 x 110 = 200 x 15 = 30 x 7 = 14
2 3 2 1 1 2 3 3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
PINJAMAN LOAN SIGNING TENOR GRACE PERIOD 18-Apr-08 10 3 18-Apr-08 10 3 18-Apr-08 10 3 18-Apr-08 10 4 18-Apr-08 10 4 29-Jul-08 13 5 29-Jul-08 13 4 29-Jul-08 10 4.5
TANGGAL 12-Jun-08 12-Jun-08 12-Jun-08 12-Jun-08 12-Jun-08 4-Sep-08 4-Sep-08 4-Sep-08
SURAT JAMINAN NOMOR S-291/MK.011/2008 S-293/MK.011/2008 S-289/MK.011/2008 S-285/MK.011/2008 S-287/MK.011/2008 S-471/MK.011/2008 S-473/MK.011/2008 S-475/MK.011/2008
4
28-Nov-08
S-658/MK.011/2008
IDR 345,463,103,887
IDR 287,885,919,905
10
5
28-Nov-08
S-660/MK.011/2008
IDR 586,254,429,476
IDR 488,545,357,897
30-Jan-09
10
3
16-Apr-09
S-232/MK.011/2009
IDR 536,413,652,597
IDR 495,151,063,936
ASBANDA
29-Apr-09
10
3
20-Aug-09
S-493/MK.01/2009
IDR 542,070,518,613
IDR 480,268,569,532
BCA Sindikasi
14-Dec-09
10
3
31-Dec-09
S-813/MK.01/2009
IDR 75,519,555,805
IDR 70,799,583,567
30-Jan-09
10
3
16-Apr-09
S-236/MK.011/2009
IDR 534,395,057,178
IDR 493,287,745,088
17-Dec-15 12-Nov-15
10 10
3 3
28-Dec-15 23-Nov-15 n/a
S-1048/MK.08/2015 S-940/MK.08/2015 n/a
IDR 2,082,906,490,237 IDR 1,999,060,931,597 n/a Proyek dibatalkan IDR 11,202,178,759,791
IDR 2,085,978,542,947 IDR 2,024,652,038,854 n/a Proyek dibatalkan IDR 10,496,061,745,183
NILAI PINJAMAN IDR 1,077,577,841,221 IDR 1,272,913,654,892 IDR 1,911,480,000,000 IDR 735,387,524,690 IDR 600,635,738,985 IDR 1,045,924,241,800 IDR 1,606,612,307,950 IDR 1,874,314,539,154
KREDITOR BCA BNI Bank Mandiri Bank Mega Bank Mega Bukopin Bukopin Bank Mega
IDR 1,240,660,976,852
Bank Mega
29-Jul-08
10
IDR 1,498,513,102,430
Bank Mega
29-Jul-08
IDR 1,155,352,482,512
BNI
IDR 1,805,307,699,643
IDR 392,100,494,133
IDR 1,151,004,738,528
BRI
IDR 2,449,962,746,818 Sindikasi BNI IDR 2,225,000,000,000 ASBANDA dan PT SMI n/a n/a
Proyek dibatalkan IDR 22,042,748,089,608
OUTSTANDING PINJAMAN OUTSTANDING PINJAMAN (Per Desember 2015) (Per Maret 2016) IDR 377,713,802,854 IDR 339,942,422,568 IDR 369,950,044,451 IDR 328,844,483,957 IDR 614,404,285,717 IDR 546,137,142,860 IDR 305,756,658,241 IDR 305,756,658,241 IDR 213,999,373,423 IDR 213,999,373,423 IDR 784,443,181,352 IDR 719,072,916,240 IDR 1,060,838,621,170 IDR 971,582,381,840 IDR 772,989,053,193 IDR 644,157,544,327
Proyek Pembangkit FTP1 untuk Mata Uang USD dan Eq USD NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
PLTU PLTU 2 Banten PLTU 1 Jabar PLTU 1 Jateng PLTU 1 Banten PLTU 2 Jatim PLTU 1 Jatim PLTU 2 Jabar PLTU 3 Banten PLTU Lampung PLTU 2 Sumut PLTU 3 Jatim PLTU NAD PLTU Sumbar PLTU 1 Kepri PLTU 1 Riau PLTU 2 Riau PLTU 1 Kalbar PLTU 2 NTB PLTU Gorontalo PLTU 2 Sulut PLTU 1 NTT PLTU Sultra PLTU 1 Kalteng PLTU 2 NTT PLTU 4 Babel PLTU 1 NTB PLTU 2 Kalbar PLTU Malut PLTU Sulsel PLTU 3 Babel PLTU 2 Papua PLTU Kalsel PLTU 2 Jateng PLTU Maluku PLTU 1 Papua
LOKASI Labuan Indramayu Rembang Suralaya Paiton Pacitan Pelabuhan Ratu Teluk Naga/Lontar Tarahan Pangkalan Susu Tanjung Awar-Awar Meulaboh Teluk Sirih Tj Balai karimun Bengkalis Selat Panjang Parit Baru Lombok Anggrek Amaurang Ende Kendari Pulang Pisau Kupang Belitung Bima Bengkayang Tidore Barru Bangka Baru Jayapura Baru Asam-asam Adipala Ambon Timika TOTAL
PROYEK KAPASITAS (MW) x 315 = 630 x 330 = 990 x 315 = 630 x 625 = 625 x 660 = 660 x 315 = 630 x 350 = 1050 x 315 = 945 x 100 = 200 x 200 = 400 x 350 = 700 x 110 = 220 x 112 = 224 x 7 = 14 x 10 = 20 x 7 = 14 x 50 = 100 x 25 = 50 x 25 = 50 x 25 = 50 x 7 = 14 x 10 = 20 x 60 = 120 x 16.5 = 33 x 16.5 = 33 x 10 = 20 x 27.5 = 55 x 7 = 14 x 50 = 100 x 30 = 60 x 10 = 20 x 65 = 130 x 660 = 660 x 15 = 30 x 7 = 14
2 3 2 1 1 2 3 3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 2 2
NILAI PINJAMAN IDR 2,741,298,159,500 IDR 592,224,258 IDR 261,800,000 USD 284,288,744 USD 330,825,515 USD 293,226,064 USD 481,937,182 USD 454,974,082 IDR 3,941,771,952,000
KREDITOR BNI BOC CDB+Barclays Cexim Cexim Cexim Cexim BOC
PINJAMAN LOAN SIGNING TENOR GRACE PERIOD 29-Jul-08 10 3 27-May-08 13 3 3-Dec-08 13 3 30-Jan-08 15 3 30-Jan-08 15 3 17-Jul-09 15 3 4-May-09 15 3 4-May-09 13 3
TANGGAL 4-Sep-08 15-Sep-08 5-Feb-09 23-Jun-08 23-Jun-08 19-Nov-09 1-Jul-09 1-Sep-09
SURAT JAMINAN NOMOR S-477/MK.011/2008 S-495/MK.011/2008 S-70/MK.011/2009 S-315/MK.011/2008 S-314/MK.011/2008 S-710/MK.011/2009 S-390/MK.011/2009 S-518/MK.011/2009
OUTSTANDING PINJAMAN OUTSTANDING PINJAMAN (Per Desember 2015) (Per Maret 2016) IDR 979,035,056,972 IDR 881,131,551,276 USD 300,236,691 USD 300,236,691 USD 143,990,000 USD 130,900,000 USD 188,195,785 USD 176,433,549 USD 192,881,997 USD 180,826,873 USD 238,974,950 USD 226,397,322 USD 443,018,729 USD 419,701,954 USD 280,892,249 USD 280,892,249
BRI
14-Oct-09
10
3
29-Dec-09
S-658/MK.011/2009
IDR 1,386,172,961,524
IDR 1,299,537,151,429
BoC Cexim CDB
14-Dec-09 4-May-09 14-Oct-09
13 15 13
3 3 3
31-Dec-09 1-Jul-09 9-Dec-09
S-811/MK.011/2009 S-391/MK.011/2009 S-754/MK.011/2009
USD 248,617,505 USD 96,692,046 USD 91,731,462
USD 248,617,505 USD 91,320,266 USD 91,731,462
BCA Sindikasi
14-Dec-09
10
3
31-Dec-09
S-815/MK.011/2009
IDR 323,652,746,667
IDR 303,424,450,000
ASBANDA
24-Apr-09
10
3
20-Aug-09
S-494/MK.01/2009
IDR 972,262,996,005
IDR 867,738,270,992
IDR 2,074,739,748,000
BRI
30-Jan-09
10
3
16-Apr-09
S-234/MK.011/2009
IDR 581,708,865,197
IDR 533,233,126,431
USD 625,256,803 n/a
CDB n/a
14-Oct-09
13
3
9-Dec-09 n/a
S-752/MK.011/2009 n/a
USD 512,401,156 n/a Proyek dibatalkan USD 2,293,405,879 IDR 4,242,832,626,365
USD 512,401,156 n/a Proyek dibatalkan USD 2,228,322,336 IDR 3,885,064,550,127
USD 371,509,145 USD 124,339,936 USD 138,336,845 IDR 688,497,080,000
IDR 2,926,692,300,357
Proyek dibatalkan USD 3,104,694,316 IDR 12,372,999,239,857
Page 3 of 5
Proyek Transmisi FTP1 untuk Mata Uang Rupiah (IDR) dan Eq USD NO
NAMA PROYEK 1 Paket 1 : proyek pembangunan transmisi terkait dengan PLTU NAD, meulaboh koneksi 1; PLTU 2 Sumut, pangkalan susu koneksi 2; PLTU Sumbar, Teluk sirih koneksi 1 dan koneksi 2; PLTU Lampung Tarahan koneksi 2; PLTU Kalsel, Asamasam koneksi 1 dan koneksi 2; PLTU 1 Kalteng, pulang pisau koneksi 2; PLTU 2 Sulut, Amurang koneksi 2
2 Paket 2 : proyek pembangunan transmisi terkait dengan PLTU 1 banten, suralaya koneksi 1 dan 2; PLTU 2 banten, labuan koneksi 1; PLTU 3 banten, teluk naga koneksi 1 dan 2; PLTU 2 jabar, pelabuhan ratu koneksi 1; PLTU 1 jateng, rembang koneksi 2; PLTU 2 jateng, adipala koneksi 2; PLTU 2 jatim, paiton baru koneksi 2; PLTU 3 jatim, tanjung awar-awar koneksi 1
3 Paket 3 : PLTU 1 di banten (suralaya) koneksi 2, PLTU 2 di banten (labuan) koneksi 2, PLTU 3 di banten (lontar) koneksi 2, PLTU 1 di jabar (indramayu) koneksi 2, PLTU 2 di jabar (p. ratu) koneksi 2, PLTU 1 jatim (pacitan) koneksi 2, PLTU 2 di jatim (paiton) koneksi 2, PLTU 3 di jatim (tj.awar-awar) koneksi 2
PROYEK TRANSMISI LOKASI T/L 275 KV Meulaboh - Sigli T/L 275 KV PLTP Sarulla - Padang Sidempuan T/L 275 KV Simangkuk - PLTP Sarulla T/L 275 KV Asahan 1 - Simangkuk T/L 275 KV Galang - Simangkuk T/L 275 KV Galang - Binjai T/L 150 KV Indarung - Bungus T/L 150 KV Bungus - Kambang T/L 150 KV Menggala - Gumawang T/L 150 KV Merangin - Sungai Penuh GI Maninjau, Simpang Empat, Sungai Penuh dan Gumawang T/L 150 KV Asam-asam - Mantul T/L 150 KV Barikin - Amuntai T/L 150 KV Amuntai - Buntok T/L 150 KV Sampit - Pangkalan Bun T/L 150 KV Lopana - Kotamobagu Transmisi 150 KV terkait PLTU 2 Banten Teluk Naga - New Tangerang Transmisi 150 KV PLTU 1 Jawa Barat Kosambi Baru - Sukamandi GITET 500 KV Kesugihan (New Rawalo) Transmisi 150 KV GITET Kesugihan Lomanis GI 150 KV Pacitan Transmisi 150 KV PLTU 1 Jawa Timur (Pacitan)-TX Pacitan dan TX Wonogiri Transmisi 150 KV Celukan Bawang Kapal (Bali) GI & T/L terkait PLTU 1 Banten Suralaya unit 8 (1x616 MW) GI & T/L terkait PLTU 2 Banten 2x300 MW Labuan GI & T/L terkait PLTU 3 Banten 3x300 MW Teluk Naga/ Lontar GI & T/L terkait PLTU 1 Jabar 3x300 MW Indramayu GI & T/L terkait PLTU 2 Jabar 3x300 MW Pelabuhan Ratu GI & T/L terkait PLTU 1 Jateng 2x300 MW Rembang GI & T/L terkait PLTU 1 Jatim 2x300 MW Pacitan GI & T/L terkait PLTU 3 Jatim 2x300MW Tj. Awar-awar Perkuatan Jakarta dan Banten Perkuatan Jawa Timur dan Bali Package 1 : 150 KV Gas Insulated Switchgear & Under Ground Cable for Jakarta & West Java Package 2 : 150 KV Gas Insulated Switchgear & Under Ground Cable for West Java & East Java Package 3 : 150 KV Conventional Substation for Java
PINJAMAN SURAT JAMINAN OUTSTANDING PINJAMAN OUTSTANDING PINJAMAN LOAN SIGNING TENOR GRACE PERIOD TANGGAL NOMOR (Per Desember 2015) (Per Maret 2016) 14-Dec-09 10 3 1-Feb-10 S-39/MK.011/2010 IDR 1,102,893,314,852 IDR 1,033,962,482,673
NILAI PINJAMAN IDR 1,930,063,301,490
KREDITOR Sindikasi Bank BNI dan Bank BRI
IDR 2,613,011,648,159
Sindikasi Bank Mandiri dan Bank BCA
14-Dec-09
10
3
1-Feb-10
S-41/MK.011/2010
IDR 1,493,149,513,148
IDR 1,399,827,668,577
IDR 327,195,149,528
Bank BCA
14-Dec-09
10
3
1-Feb-10
S-43/MK.011/2010
IDR 186,968,656,873
IDR 175,283,115,819
IDR 1,067,683,579,600
Sindikasi BRI
27-Dec-10
10
3
24-Mar-11 S-158/MK.01/2011
IDR 747,733,795,002
IDR 710,347,105,251
IDR 3,530,745,279,875
IDR 3,319,420,372,320
TOTAL PAKET 1 - 3
2. Proyek Percepatan Pembangunan Pembangkit Tenaga Listrik Yang Menggunakan Energi Terbarukan, Batubara dan Gas (10.000 MW Tahap 2 (FTP 2)) NO 1
PLTU PLTP Rajabasa
2
PLTP Muaralaboh
3
PLTA Wampu
PROYEK LOKASI KAPASITAS (MW) Daerah Gunung Rajabasa Kabupaten Lampung 2 x 110 = 220 Selatan, Provinsi Lampung Liki Pinangawan Muaralaboh 2 x 110 = 220 3 x
6
Sungai Wampu, Kabupaten Karo, Sumatera Utara PLTP Rantau Dedap Kabupaten Muara Enim, Lahat dan Kota Pagar Alam, Sumatera Selatan PLTP Sarulla Kabupaten Tapanuli Utara dan Tapanuli Selatan PLTA Semangka Kabupaten Tanggamus, Provinsi Lampung
7
PLTU Kalsel
Tanjung-Kalimantan Selatan
2 x 100 = 200
8 9
PLTU Kaltim PLTP Ijen
Kabupaten Bontang, Kalimantan Timur 2 x 100 = 200 Blawan-Ijen, Kabupaten Bondowoso, 2 x 55 = 110 Kabupaten Banyuwangi, Kabupaten Situbondo
4 5
15 =
45
SURAT JAMINAN TANGGAL NOMOR 2-Mar-12 S-151/MK.011/2012
PENERIMA JAMINAN NILAI PROYEK USD 663,328,250 PT Supreme Energy Rajabasa USD 602,669,500 PT Supreme Energy Muaralaboh USD 174,168,238 PT Wampu Electric Power
2 x 110 = 220
2-Mar-12
S-152/MK.011/2012
15-Jun-12
S-438/MK.011/2012
USD 664,049,500 PT Supreme Energy Rantau Dedap 3 x 110 = 330 USD 1,399,486,000 PT Sarulla Operation Ltd
21-Nov-12 S-833/MK.011/2012
2 x
17-Oct-14 S-722/MK.011/2014
28 =
Total
56
USD 172,000,000 PT. Tanggamus Electric Power USD 390,000,000 PT. Tanjung Power Indonesia USD 314,478,000 PT. Graha Power Kaltim USD 568,985,030 PT. Medco Cahaya Geothermal
10-Apr-13 S-285/MK.011/2013
17-Oct-14 S-720/MK.011/2014 25-May-15 25-May-15
S-391/MK.08/2015 S-387/MK.08/2015
USD 4,949,164,518
3. Proyek Kerjasama Pemerintah dengan Badan Usaha (KPBU) melalui Badan Usaha Penjaminan Infrastruktur (BUPI) NO 1
PLTU PLTU Jawa Tengah
PROYEK LOKASI KAPASITAS (MW) Kab. Batang - Jawa Tengah 2 x 1000 = 2000
PENERIMA JAMINAN NILAI INVESTASI USD 3,200,000,000 PT Bhimasena Power Indonesia
PERJANJIAN JAMINAN TANGGAL 6-Oct-11
Page 4 of 5
4. Proyek percepatan penyediaan air minum yang dilaksanakan oleh PDAM NO 1 2 3 4 5 6 7 8 9 10 11
PROYEK NAMA PDAM LOKASI NILAI PINJAMAN KREDITOR LOAN SIGNING TENOR GRACE PERIOD PDAM Tirta Kahuripan Kab. Bogor Bogor 24,312,000,000 Bank BRI 11-Oct-11 8 1 PDAM Tirta Galuh Kab. Ciamis Ciamis 14,700,000,000 Bank Jabar-Banten 11-Oct-11 8 0 PDAM Lombok Timur Lombok 11,175,000,000 Bank BNI 11-Oct-11 13 1 PDAM Kota Malang Malang 44,974,000,000 Bank BNI 18-Sep-12 9 2.5 PDAM Bandarmasih Banjarmasin 110,000,000,000 BPD Kalsel 21-Sep-12 10 1.5 PDAM Kota Denpasar Denpasar 32,350,000,000 BPD Bali 30-Dec-14 10 1 PDAM Giri Menang Mataram 45,000,000,000 Sindikasi BPD Bali, NTB, Kalsel 31-Dec-14 9 2 PDAM Tirta Satria Kab. Banyumas Banyumas 16,870,000,000 BPD Jateng 31-Dec-14 10 1 PDAM Kab. Cilacap Cilacap 8,126,000,000 BPD Jateng 31-Dec-14 10 1 PDAM Kota Palopo Palopo 17,294,000,000 Bank BRI 31-Dec-14 10 2 PDAM Kab. Buleleng Denpasar 3,500,000,000 BPD Bali 31-Dec-14 6 1
SURAT JAMINAN OUTSTANDING PINJAMAN OUTSTANDING PINJAMAN (Per Desember 2015) (Per Maret 2016) TANGGAL NOMOR 12-Dec-11 S-015/MK.11/2011 13,109,505,082 13,109,505,082 12-Dec-11 S-016/MK.11/2011 8,554,063,180 7,484,805,282 30-Dec-11 S-017/MK.11/2011 2,071,352,000 2,071,352,000 3-Dec-12 S-034/MK.11/2012 17,795,281,000 15,996,331,000 25-Feb-13 S-07/MK.11/2013 90,588,235,292 84,117,647,056 12-Mar-15 S-05/MK.10/2015 20,988,130,000 20,988,130,000 4-Feb-15 S-01/MK.11/2015 4-Feb-15 S-03/MK.11/2015 10,137,481,920 4-Feb-15 S-02/MK.11/2015 12-Mar-15 S-06/MK.10/2015 10,129,856,000 10,129,856,000 12-Mar-15 S-04/MK.10/2015 163,236,422,554 164,035,108,340
C. ALOKASI ANGGARAN KEWAJIBAN PENJAMINAN DALAM APBN No
Rincian Program Penjaminan
LKPP 2008 (Audited)
LKPP 2009 (Audited)
LKPP 2010 (Audited)
Alokasi Anggaran Kewajiban Penjaminan (miliar rupiah) LKPP 2011 LKPP 2012 LKPP 2013 LKPP 2014 APBN 2015 (Audited) (Audited) (Audited) (Audited)
APBN-P 2015
APBN 2016
RAPBN-P 2016
A. PENJAMINAN KREDIT 1. Coal Power Plant 10.000MW Fast Track Program (FTP 1) 2. Clean Water Availability 3. SOE's Direct Lending from International Financial Institution 4. Sumatera Toll Roads Project Total Penjaminan Kredit
No
Rincian Program Penjaminan
IDR 283.00
IDR 1,000.00
IDR 1,000.00
IDR 889.00
IDR 623.30
IDR 611.22
IDR 913.65
IDR 833.20
IDR 792.00
IDR 593.89
IDR 570.53
IDR 50.00
IDR 15.00
IDR 10.00
IDR 35.00
IDR 2.23
IDR 1.90
IDR 1.80
IDR 0.89
IDR 0.59
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
IDR 283.00
IDR 1,000.00
IDR 1,050.00
IDR 904.00
IDR 633.30
IDR 646.22
IDR 915.89
IDR 835.10
Alokasi Anggaran Kewajiban Penjaminan (miliar rupiah) LKPP 2011 LKPP 2012 LKPP 2013 LKPP 2014 APBN 2015 (Audited) (Audited) (Audited) (Audited)
LKPP 2008 (Audited)
LKPP 2009 (Audited)
LKPP 2010 (Audited)
-
-
-
-
-
-
-
-
-
-
IDR 793.80
APBN-P 2015
-
IDR 594.78
APBN 2016
IDR 571.12
Usulan RAPBN-P
B. PENJAMINAN INVESTASI 1. Renewable energy, Coal and Gas Power Plant 10.000MW Fast Track Program (FTP 2) 2. Public-Private Partnerships Project (PPP)/KPBU/KPS) Total Penjaminan Investasi Total Penjaminan
IDR 0.00 IDR 283.00
IDR 0.00 IDR 1,000.00
IDR 0.00 IDR 1,050.00
IDR 59.82
IDR 48.18
IDR 296.50
-
-
-
IDR 49.70
IDR 323.23 IDR 323.23
IDR 0.00
IDR 0.00
IDR 59.82
IDR 48.18
IDR 296.50
IDR 49.70
IDR 904.00
IDR 633.30
IDR 706.04
IDR 964.07
IDR 1,131.60
IDR 843.50
IDR 918.01
IDR 80.56 IDR 80.56 IDR 651.67
Keterangan: Mulai tahun 2013, sesuai dengan ketentuan dalam Peraturan menteri keuangan Nomor 30 tahun 2012 tentang Tata Cara Pengelolaan Dana Cadangan Penjaminan Dalam Rangka Pelaksanaan Anggaran Kewajiban Penjaminan Pemerintah, alokasi anggaran kewajiban penjaminan Pemerintah yang tidak terealisasi sampai dengan akhir triwulan III dapat dipindahbukukan ke dalam rekening dana cadangan penjaminan Pemerintah. Sampai dengan 31 Maret 2016, posisi saldo rekening dana cadangan penjaminan Pemerintah sebesar Rp1.670,1 miliar yang merupakan akumulasi pemindahbukuan anggaran kewajiban penjaminan berdasarkan alokasi APBN 2013 dan 2014 (alokasi TA 2015 tidak dapat dipindahbukukan karena kebutuhan kapasitas fiskal APBN).