MEMORI AKHIR TUGAS Ir. WINARNO, MEngSc DIREKTUR BINA PELAKSANAAN WILAYAH II Periode Tahun : 2011 - 2013
Jakarta, 28 Juni 2013
DAFTAR ISI hal DAFTAR ISI ............................................................................................................................................................................................... KATA PENGANTAR ................................................................................................................................................................................. I. PENDAHULUAN .............................................................................................................................................................................. II. STRUKTUR ORGANISASI DITJEN BINA MARGA ....................................................................................................................... III. STRUKTUR DAN KEGIATAN DIREKTORAT BINA PELAKSNAAN WILAYAH II ...................................................................... III.1. Kedudukan, Tugas dan Fungsi ............................................................................................................................................... III.2. Struktur Organisasi Direktorat Bina Pelaksanaan Wilayah I ................................................................................................. III.3. Sumber Daya Manusia ............................................................................................................................................................. III.4. Sub Direktorat Sistem Pengendalian Wilayah II ..................................................................................................................... III.4.1. Tugas dan Fungsi (Tusi) ............................................................................................................................................... III.4.2. Seksi Pengendalian Penyiapan Pelaksanaan Wilayah II ........................................................................................... III.4.3. Seksi Pengendalian Pelaksanaan Wilayah II .............................................................................................................. III.4.4. Sumber Daya Manusia (SDM) ...................................................................................................................................... III.5. Sub. Direktorat Wilayah II A .................................................................................................................................................... III.5.1. Tugas dan Fungsi (Tusi) ............................................................................................................................................... III.5.2. Seksi Penyiapan Pelaksanaan Wilayah II A ................................................................................................................ III.5.3. Seksi Pelaksanaan Wilayah II A .................................................................................................................................. III.5.4. Sumber Daya Manusia (SDM) ...................................................................................................................................... III.6. Sub. Direktorat Wilayah II B ...................................................................................................................................................... III.6.1. Tugas dan Fungsi (Tusi) ............................................................................................................................................... III.6.2. Seksi Penyiapan Pelaksanaan Wilayah II B ................................................................................................................ III.6.3. Seksi Pelaksanaan Wilayah II B .................................................................................................................................. III.6.4. Sumber Daya Manusia (SDM) ...................................................................................................................................... III.7. Sub. Direktorat Wilayah II C .................................................................................................................................................... III.7.1. Tugas dan Fungsi (Tusi) ............................................................................................................................................... III.7.2. Seksi Penyiapan Pelaksanaan Wilayah II C ............................................................................................................... III.7.3. Seksi Pelaksanaan Wilayah II C ................................................................................................................................. III.7.4. Sumber Daya Manusia (SDM) ..................................................................................................................................... III.8. Sub. Direktorat Wilayah II D ..................................................................................................................................................... III.8.1. Tugas dan Fungsi (Tusi) .............................................................................................................................................. III.8.2. Seksi Penyiapan Pelaksanaan Wilayah II D ...............................................................................................................
2 4 5 7 8 8 9 10 19 19 20 20 20 21 21 22 22 22 23 23 24 24 24 25 25 26 26 26 27 27 28
hal III.8.3. Seksi Pelaksanaan Wilayah II D .................................................................................................................................. III.8.4. Sumber Daya Manusia (SDM) ....................................................................................................................................... III.9. Struktur Organisasi Satuan Kerja Direktorat Bina Pelaksanaan Wilayah II ............................................................................ III.10.Kegiatan Satker Direktorat Bina Pelaksanaan Wilayah II - T.A.2013 .................................................................................... III.11.Barang Milik Negara (BMN) .................................................................................................................................................... IV. STRUKTUR ORGANISASI BALAI ................................................................................................................................................. IV.1.Struktur Organisasi Balai Besar Pelaksanaan Jalan Nasional IV ............................................................................................ IV.2 Struktur Organisasi Balai Besar Pelaksanaan Jalan Nasional V ............................................................................................. IV.3 Struktur Organisasi Balai Besar Pelaksanaan Jalan Nasional VII ........................................................................................... IV.4 Struktur Organisasi Balai Pelaksanaan Jalan Nasional VIII .................................................................................................... V. POHON ANGGARAN DIREKTORAT BINA PELAKSANAAN WILAYAH II TA.2013 ................................................................. V.1. Pohon Anggaran Balai Besar Pelaksanaan Jalan Nasional IV ............................................................................................... V.2. Pohon Anggaran Balai Besar Pelaksanaan Jalan Nasional V ................................................................................................. V.3. Pohon Anggaran Balai Besar Pelaksanaan Jalan Nasional VII ............................................................................................... V.4. Pohon Anggaran Balai Pelaksanaan Jalan Nasional VIII ........................................................................................................ VI. POHON ANGGARAN DIREKTORAT BINA PELAKSANAAN WILAYAH II TA.2012 ................................................................. V.1. Pohon Anggaran Balai Besar Pelaksanaan Jalan Nasional IV ............................................................................................... V.2. Pohon Anggaran Balai Besar Pelaksanaan Jalan Nasional V ................................................................................................ V.3. Pohon Anggaran Balai Besar Pelaksanaan Jalan Nasional VII .............................................................................................. V.4. Pohon Anggaran Balai Pelaksanaan Jalan Nasional VIII ........................................................................................................ VII. POHON ANGGARAN DIREKTORAT BINA PELAKSANAAN WILAYAH II TA.2011 ................................................................. V.1. Pohon Anggaran Balai Besar Pelaksanaan Jalan Nasional IV ............................................................................................... V.2. Pohon Anggaran Balai Besar Pelaksanaan Jalan Nasional V ................................................................................................ V.3. Pohon Anggaran Balai Besar Pelaksanaan Jalan Nasional VII .............................................................................................. V.4. Pohon Anggaran Balai Pelaksanaan Jalan Nasional VIII ....................................................................................................... VIII. PENYERAPAN DANA PER TAHUN ANGGARAN ...................................................................................................................... VII.1.Penyerapan Dana TA 2013 .................................................................................................................................................... VII.2.Penyerapan Dana TA 2012 .................................................................................................................................................... VII.3.Penyerapan Dana TA 2011 .................................................................................................................................................... IX. DATA MULTI YEAR CONTRACTS (MYC) .................................................................................................................................... X. DATA PINJAMAN DAN HIBAH LUAR NEGERI (PHLN) ............................................................................................................. XI. DATA KONDISI JALAN ................................................................................................................................................................. PENUTUP ........................................................................................................................................................................................
28 28 33 35 41 44 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 71 78 85 90 96 97
I. PENDAHULUAN Aktivitas ke-binamarga-an di Indonesia tercatat dimulai pada zaman penjajahan Belanda dengan dibangunnya Jalan Raya Pos (Groote Postweg) dari Anyer ke Panarukan atas perintah Gubernur Jenderal Herman Willem Daendles tahun 1808 -1811. Pada tahun 1811-1816, jalan jalan simpangan ke daerah kegiatan perkebunan dibangun khususnya di Jawa Barat oleh Gubernur Jenderal Thomas Stamford Raffles. Di pulau Sumatera, jalan jalan seperti di Bukit Tinggi (fort de Kock) dibangun pada zaman Gubernur Jenderal J. Van den Bosch tahun 1830 – 1834. Pada tanggal 16 September 1918, dibentuk Departemen van Burgelijke Openbare Werken (BOW) dengan salah satu tugasnya adalah pembangunan, pemeliharaan dan pengelolaan jalan raya termasuk bangunan jalan beserta kelengkapan serta jembatan tambang. Tahun 1933, BOW bergabung dengan Departement Van Gouvernements Bedrijven menjadi Depertement Van Warker en Waterstaat (Perhubungan dan Pengairan). Pada masa ini lahir peraturan tentang persyaratan pemakaian jalan raya/umum pengangkutan dan pengamanan lalu lintas jalan. Pada awal kemerdekaan RI sampai masa Orde Lama, dicatat bahwa tanggal 18 Agustus 1945 di bentuk Departemen Pekerjaan Umum, namun pada tahun 1949 berubah menjadi Departemen Perhubungan, Tenaga dan Pekerjaan Umum. Tahun 1950 – 1959 berubah lagi namanya menjadi Kementerian Pekerjaan Umum, dan yang menangani pekerjaan ke-binamarga-an disebut Jawatan jalanjalan, Jembatan dan Konstruksi. Pada tahun 1959 – 1965 terjadi lagi perubahan nama Direktorat Jalan-Jalan Umum Depertemen Pekerjaan Umum dan Tenaga Kompartemen Pembangunan. Tahun 1965 dibentuk Departemen Bina Marga dan Departemen Jalan Raya Sumatera Kompartemen Pekerjaan Umum. Pada masa Orde Baru, tahun 1966 dibentuk Direktorat Jenderal Bina Marga Otorita Jalan Raya Jagorawi Departemen Pekerjaan Umum. Saat itu pulau Sumatera diperlakukan khusus dengan adanya Direktorat Jenderal Jalan Raya Sumatera yang terdiri dari Sekretariat Direktorat Jenderal dan Otorita Jalan Raya Sumatera. Direktorat Jenderal Jalan Raya Sumatera di-likuidasi dan diganti dengan Proyek Khusus Jalan Raya Sumatera tahun 1967. Pada tahun 1975 kembali lagi digunakan Direktorat Jenderal Bina Marga Departemen Pekerjaan Umum yang terdiri dari Sekretariat Direktorat Jenderal, Direktorat Bina Program Jalan, Direktorat Pembangunan Jalan, Direktorat Pemeliharaan Jalan, Direktorat Peralatan Jalan, DPMTJ dan RBO.
Pada tahun 1994, nama Direktorat pada Direktorat Jenderal Bina Marga bersama-sama dengan Sekretariat Direktorat Jenderal, Direktorat Bina Program, Direktorat Bina Teknik, Direktorat Bina jalan Kota, Direktorat Bina Pelaksanaan Wilayah Barat, Direktorat Bina Pelaksanaan Wilayah Tengah dan Direktorat Bina Pelaksanaan Wilayah Timur. Pada tahun 1999 – 2000 terjadi perubahan nama menjadi Departemen Permukiman dan Pengembangan wilayah (Kimbangwil) dan Direktorat Jenderal Pengembangan Prasarana Wilayah. Tahun 2001 terjadi lagi perubahan nama menjadi Departemen Permukiman dan Prasarana Wilayah (Kimpraswil), Direktorat Jenderal Prasarana Wilayah (Ditjen Praswil). Pada tahun 2004 nama Direktorat Jenderal Bina Marga muncul kembali. Tahun 2010 sesuai dengan amanat UUD 1945, nama Departemen Pekerjaan Umum diganti menjadi Kementerian Pekerjaan Umum. Sejak tahun 2010 dimana Direktorat Bina Pelaksanaan Wilayah Barat terpecah menjadi dua Wilayah diantaranya, Direktorat Bina Pelaksanaan Wilayah I (Sumatera) dan Direktorat Bina Pelaksanaan Wilayah II (Jawa, Kalimatan, Bali, NTB dan NTT) sampai saat ini, Direktorat Bina Pelaksanaan Wilayah II tetap eksis. Kantor Direktorat Bina Pelaksanaan Wilayah II yang saat ini berlokasi di Gedung Bina Marga lantai VII, Jl. Pattimura No. 20 Jakarta Selatan, dimana Direktorat Bina Pelaksanaan Wilayah II terdiri dari Subdit Sistem Pengendalian Wilayah II, Subdit Wilayah II A (Banten, DKI Jakarta, Jabar), Subdit Wilayah II B (Jateng, DIY, Jatim), Subdit Wilayah II C (Bali, NTB, & NTT), Subdit Wilayah II D (Kalbar, Kalsel, Kaltim, & Kalteng) didukung oleh Sub Bagian Tata Usaha. Memori akhir tugas ini merupakan rangkaian kegiatan yang dilakukan khususnya pada tahun anggaran 2011 s/d 2013, mencakup informasi kepegawaian / SDM , kinerja dan capaian kegiatan serta Barang Milik Negara (BMN) di lingkungan Direktorat Bina Pelaksanaan Wilayah II. Dengan terbitnya SK Menteri PU Nomor : 419/KPTS/M/2010 tanggal 21 Juli 2010. Tentang Pembebasan dan Pengangkatan Pejabat Pimpinan Eselon II.a di Lingkungan Kementerian Pekerjaan Umum, maka penugasan kami di Direktorat Bina Pelaksanaan Wilayah II telah berakhir, dimana tugas tersebut telah saya jalani sejak tanggal 22 Juli 2010 yang lalu. Sebagaimana kebiasaan, agar pejabat baru mendapat masukan awal tentang Tupoksi, kondisi SDM dan Program Kerja yang sedang dilaksanakan pada Tahun Anggaran 2013 ini, maka dengan ini kami membuat Memori Akhir Tugas. Adapun Memori Tugas Akhir ini memuat antara lain : - Tupoksi dari Direktorat Bina Pelaksanaan Wilayah II - Kondisi Perangkat Penunjang Tupoksi mulai dari SDM, peralatan penunjang dll. - Program Direktorat Bina Pelaksanaan Wilayah II
II. STRUKTUR ORGANISASI DIREKTORAT JENDERAL BINA MARGA
DIREKTORAT JENDERAL BINA MARGA SEKRETARIAT DIREKTORAT JENDERAL
JABATAN FUNGSIONAL
BAGIAN KEPEGAWAIAN & ORTALA
DIREKTORAT BINA PROGRAM SUBBAG TU
BAGIAN KEUANGAN & UMUM
DIREKTORAT BINA PELAKSANAAN WILAYAH I
DIREKTORAT BINA TEKNIK SUBBAG TU
SUBBAG TU
BAGIAN HUKUM & PER-UU
BAGIAN PENGELOLAAN BARANG MILIK NEGARA
DIREKTORAT BINA PELAKSANAAN WILAYAH II SUBBAG TU
JABATAN FUNGSIONAL
DIREKTORAT BINA PELAKSANAAN WILAYAH III SUBBAG TU
SUB DIREKTORAT KEBIJAKAN & STRATEGI
SUB DIREKTORAT TEKNIK JALAN
SUB DIREKTORAT SISTEM PENGENDALIAN WILAYAH I
SUB DIREKTORAT SISTEM PENGENDALIAN WILAYAH II
SUB DIREKTORAT SISTEM PENGENDALIAN WILAYAH III
SUB DIREKTORAT PROGRAM & ANGGARAN
SUB DIREKTORAT TEKNIK JEMBATAN
SUB DIREKTORAT WILAYAH IA
SUB DIREKTORAT WILAYAH IIA (Banten, DKI & Jabar)
SUB DIREKTORAT WILAYAH IIIA
SUB DIREKTORAT PEMBIAYAAN & KERJASAMA LUAR NEGERI
SUB DIREKTORAT TEKNIK LINGKUNGAN & KESELAMATAN JALAN
SUB DIREKTORAT WILAYAH IB
SUB DIREKTORAT WILAYAH IIB (Jateng, DIY & Jatim)
SUB DIREKTORAT WILAYAH IIIB
SUB DIREKTORAT PENGEMBANGAN SISTEM & EVALUASI KINERJA
SUB DIREKTORAT TEKNIK JALAN BEBAS HAMBATAN & JALAN PERKOTAAN
SUB DIREKTORAT WILAYAH IC
SUB DIREKTORAT WILAYAH IIC (Bali, NTB & NTT)
SUB DIREKTORAT WILAYAH IIIC
SUB DIREKTORAT INFORMASI & KOMUNIKASI
SUB DIREKTORAT PENGADAAN TANAH
SUB DIREKTORAT WILAYAH ID
SUB DIREKTORAT WILAYAH IID (Kalimantan)
SUB DIREKTORAT WILAYAH IIID
JABATAN FUNGSIONAL
JABATAN FUNGSIONAL
JABATAN FUNGSIONAL
JABATAN FUNGSIONAL
JABATAN FUNGSIONAL
BALAI I S/D XI
III. STRUKTUR DAN KEGIATAN DIREKTORAT BINA PELAKSNAAN WILAYAH II III.1. Kedudukan, Tugas dan Fungsi Direktorat Bina Pelaksanaan Wilayah II merupakan salah satu Direktorat pada Direktorat Jenderal Bina Marga yang terbentuk berdasarkan Peraturan Menteri Pekerjaan Umum Nomor: 08/PRT/M/2010 tanggal 8 Juli 2010 tentang Organisasi dan Tata Kerja Kementerian Pekerjaan Umum. TUGAS :
Melaksanakan penyelenggaraan jalan nasional dan pembinaan teknik jalan provinsi, kabupaten, kota dan desa di wilayah Pulau Jawa, Bali, Kepulauan Nusa Tenggara dan Kalimantan.
FUNGSI : 1.
Penyiapan rencana kegiatan penyelenggaraan jalan nasional dan pembinaan teknik termasuk bimbingan teknis penyelenggaraan jalan provinsi, kabupaten, kota & desa; 2. Pembinaan pengadaan tanah jalan nasional; 3. Penyiapan rekomendasi laik fungsi jalan nasional; 4. Pembinaan penanggulangan darurat dan perbaikan kerusakan jalan akibat Bencana Alam; 5. Pembinaan pelaksanaan konstruksi dan penggunaan bahan dan peralatan; 6. Penilaian usulan program penanganan jalan nasional dari BBPJN/BPJN; 7. Penilaian usulan program penanganan jalan provinsi, kabupaten, kota dan desa yang dibiayai oleh Dana Alokasi Khusus (DAK) dan dana pusat lainnya; 8. Pembinaan manajemen kontrak termasuk fasilitasi perubahan dokumen anggaran; 9. Pelaksanaan bimbingan teknis pelaksanaan jalan nasional termasuk jalan bebas hambatan; 10. Pelaksanaan fasilitasi penyelenggaraan jalan provinsi, kab, kota dan desa termasuk pengaturan, pembinaan, dan pengendalian fungsi dan manfaat jalan; dan 11. Pelaksanaan tata usaha Direktorat Bina Pelaksanaan Wilayah II.
III.2. Struktur Organisasi Direktorat Bina Pelaksanaan Wilayah II
Struktur Organisasi Direktorat Bina Pelaksanaan Wilayah II di dalam menyelenggarakan tugas pokok dan fungsi-fungsi dalam Artikel 1.1. adalah sebagaimana gambar 1 berikut ini :
DIREKTORAT BINA PELAKSANAAN WILAYAH II
Ir. Winarno, M.EngSc
SUB BAGIAN TU Ir. Muftoni
SUB DIREKTORAT SISTEM PENGENDALIAN WILAYAH II Ir. Tasripin Sartiyono, MT
SUB DIREKTORAT WILAYAH IIA (DKI, Jabar & Banten) Ir. Thomas Setiabudi Aden, M.Sc.Eng
SUB DIREKTORAT WILAYAH IIB
SUB DIREKTORAT WILAYAH IIC
(JATENG, DIY & JATIM)
(BALI, NTB, & NTT)
(KALBAR, KALSEL, KALTIM, & KALTENG)
Ir. Zamharir Basuni, M.MT
Ir. Susalit Alius, CES
Ir. Solo Riyadi Limbong, MM
SUB DIREKTORAT WIL. IID
SEKSI PENGENDALIAN PENYIAPAN PELAKSANAAN WILAYAH II Ir. Yudiarmand Zulkarnain Kasim,M.Eng.Sc
SEKSI PENYIAPAN PELAKSANAAN WILAYAH II A M. Adi Sulistijono, B.Sc, SE
SEKSI PENYIAPAN PELAKSANAAN WILAYAH II B Ir. R.M. Bambang Nugoho
SEKSI PENYIAPAN PELAKSANAAN WILAYAH II C Ir. Hari Satyawan
SEKSI PENYIAPAN PELAKSANAAN WILAYAH II D
SEKSI PENGENDALIAN PELAKSANAAN WILAYAH II Sudirman, ST
SEKSI PELAKSANAAN WILAYAH II A Ir. Bambang Suryono, M.Sc
SEKSI PELAKSANAAN WILAYAH II B
SEKSI PELAKSANAAN WILAYAH II C Erna Wijayanti, ST, M.Sc
SEKSI PELAKSANAAN WILAYAH II D Ir. Bowo Sudiatmanto, MT
Ir. Beni Fariati Handayani Mrih rahayu, MT
JABATAN FUNGSIONAL Ir. Engkan Lengkana Ranu Ir. Dwi Sapto Haryanto
Ir. Birviq Ady Sanjaya, M.MT
III.3. Sumber Daya Manusia
Sumber daya manusia yang bertugas di Direktorat Bina Pelaksanaan Wilayah II berjumlah total 94 orang yang terdiri dari: Pegawai Negeri Sipil (PNS) sebayak Pegawai Harian Proyek (pusat) Pegawai menurut pangkat/golongan terdiri dari: Pembina Utama / IVe Pembina Utama Madya / IVd Pembina Utama Muda/ IVc Pembina Tk.1 / IVb Pembina / IVa Penata Tk.1 / IIId Penata / IIIc Penata Muda Tk.1 / IIIb Penata Muda / IIIa Pengatur Tk.1 / IId Pengatur / IIc Pengatur Muda Tk. 1 / IIb Pengatur Muda / IIa Juru Tk.1 / Id Juru / Ic Juru Muda Tk.1 / Ib Juru Muda / Ia
= 79 pegawai = 15 pegawai
= 1 pegawai = - pegawai = 1 pegawai = 5 pegawai = 9 pegawai = 5 pegawai = 10 pegawai = 16 pegawai = 21 pegawai = - pegawai = 4 pegawai = 1 pegawai = 1 pegawai = 2 pegawai = 2 pegawai = 2 pegawai = - pegawai
TABEL III.1. DAFTAR NOMINATIF PEGAWAI NEGERI SIPIL DIREKTORAT BINA PELAKSANAAN WILAYAH II
NO
NAMA / TGL. LAHIR
1
2
1
Ir. Winarno, M.EngSc Surakarta, 22-06-1953
NIP
GOL/
TINGKAT
RUANG TMT
PENDIDIKAN
PENDIDIKAN JURUSAN
TAHUN LULUS
STATUS ALUMNI
JABATAN
3
4
5
6
7
8
9
10
110025687 / 19530622 198202 1 001
IV/e 1-07-2013
Sarjana (S1) Pasca Sarjana (S2)
Teknik Sipil Civil Engineering
10-10-1979 16-10-1992
Univ. Diponegoro Univ. New South Wales, Australia
Direktur Binlak. Wil. II Tgl. 23-07-2010
Pusat
JAFUNG (JABATAN FUNGSIONAL) 1
Ir. Engkan Lengkana Ranu Bandung, 17-01-1955
110025520 /19550117 198201 1 001
IV/c 1-10-2009
Sarjana (S1)
T. Geodesi
27-1-1979
ITB
Jafung Teknik Jalan & Jemb Madya Tgl. 1-2-2010
Pusat
2
Ir. Dwi Sapto Haryanto Jakarta, 10-12-1955
110035565 / 19551210 198511 1 001
IV/a 1-4-2012
Sarjana (S1)
T. Geodesi
13-03-1982
ITB
Jafung Teknik Jalan & Jemb Madya Tgl. 1-1-2012
Pusat
SUB BAGIAN TATA USAHA 1
Ir. Muftoni Pemalang, 28-05-1958
110042279 / 19580528 198911 1 002
IV/a 01-10-2010
Sarjana (S1)
T. Sipil
19-07-1985
Univ. Diponegoro
Kepala Sub Bagian Tata Usaha Tgl. 12-10-2012
Pusat
2
Endang Purwati, BA Jakarta, 08-04-1962
110043823 / 19620408 199003 2 003
III/c 01-04-2008
SARMUD (DIII)
Akutansi
26-02-1987
YAI Jakarta
Penata Keuangan (Virifikasi/Penyiapan SPM)
Pusat
3
Tejo Suharto, BE Bandung, 09-01-1959
110044309 / 19590109 199003 1 001
III/c 01-04-2012
Samud (DIII)
Jalan & Jemb.
17-12-1994
LPPU - ITB
Caraka
Pusat
4
Sugito Lirig, Sumatera, '01-12-1957
110044638 / 19571201 199012 1 001
III/b 01-04-2011
SMA
IPS
17-07-1985
SMA 47 Jakarta
Sekretaris
Pusat
5
Dasa Retno Edyatun Purworejo, 12-10-1961
110044878 / 19611012 199101 2 001
III/b 01-04-2011
SMA
IPS
30-04-1982
SMAN 2 Slawi, Tegal
Analis Kepegawaian
Pusat
6
Maladi Tangerang, 29-05-1962
110046999 / 19620529 199103 1 003
III/b 01-04-2011
SPG
Sekolah Dasar
Tgl. 07-05-1982
SPG Tangerang
Penata Keuangan (Verifikasi/Penyiapan SPM)
Pusat
7
Solihin, S.Sos Purbalingga, 02-09-1967
110055640 / 19670902 200212 1 001
III/b 01-10-2012
SMEA 18 Jakarta
Analis Kepegawaian
Pusat
1.SMEA
Perdagangan
2.Sarjana (S1)
Ilmu Adm. Negara
Tgl. 24-08-2007
Tgl. 13-5-1988
STIAMI Jakarta
KET
KEPEGAWAIAN
8
Hendix Hermawan Dwilaksana, S.AP Kediri, 09-07-1987
19870709 201012 1 003
III/a 01-12-2010
Sarjana (S1)
Ilmu Adm.Publik
Tgl. 30-09-2010
Univ. Brawijaya
Analis Kepegawaian
Pusat
9
Ignatius Indra Gema Darmawijaya, S.IP Yogyakarta, 20-01-1985
19850120 201012 1 004
III/a 01-12-2010
Sarjana (S1)
Ilmu Adm. Negara
Tgl. 15-08-2007
UGM
Pengolah BMN
Pusat
10
Ichsan Sanjaya Perkasa, A.Md Blitar, 12-08-1989
19890812 201012 1 002
II/c 01-12-2010
Sarmud. (DIII)
Manajemen Informatika
Tgl. 12-08-2009
Univ. Pajajaran
Analis Kepegawaian
Pusat
11
Kerry Andy Hutagaol, A.Md Lagoboti, 18-08-1987
19870818 201012 1 002
II/c 01-12-2010
Sarmud. (DIII)
Kesekretariatan
Tgl. 29-06-2010
Univ. Sumatera Utara
Pengadministrasian Umum
Pusat
12
Suyamta Tlagalele, 18-12-1987
110053215 / 19571218 199504 1 001
II/c 01-04-2013
SMP
-
14-06-1991
SMP Jakarta
Pramubakti
Pusat
13
Magda Simatupang Marayap, 17-03-1963
110061288 / 19630317 200701 2 002
II/b 01-04-2011
SMA
IPS
01-01-1984
SMA Bina Guna Medan
Sekretaris
Pusat
14
Matsani Jakarta, 07-10-1964
110063134 / 19641007 200701 1 001
I/c 01-01-2007
SMP
-
Th. 1964
SMP Jakarta
Caraka
Pusat
15
Nisan Tangerang, 27-09-1960
110059933 / 19600927 200604 1 003
I/b 01-04-2010
SD
-
Th. 1973
SD Pondok Ranji, Tangerang
Pengadministrasian Umum
Pusat
11
NO
GOL/
TINGKAT
NAMA / TGL. LAHIR
NIP
RUANG TMT
PENDIDIKAN
JURUSAN
TAHUN LULUS
ALUMNI
JABATAN
KEPEGAWAIAN
2
3
4
5
6
7
8
9
10
110049137 / 19610302 199203 2 001
IV/a 01-10-2011
1. SMA
IPS
Tgl. 1979
Penata Keuangan (Assisten Keuangan)
Pusat
2.Sarjana (S1)
Manajemen
Tgl. 1992
Univ. Moestopo Jakarta
3.Pasca Sarjana (S2)
Magister Ilmu Adm.
Tgl. 16-2-2010
STIAMI Jakarta
1. SMA-
IPA
Tgl.30-4-1980
SMAK Cilacap
Bendahara Pengeluaran
Pusat
2. Sarjana (S1)
Amd. Negara
Tgl.12-03-2007
STIAMI Jakarta
3.Pasca Sarjana (S2)
Ilmu Amd. Negara
Tgl.12-5-2009
STIAMI Jakarta Penata Keuangan (Petugas SPM)
Pusat
Pengadministrasi Umum
Pusat
1
16
17
SATKER Lampita Kristanti, SE, M.Si Medan, 02-03-1961
Suyatno, S.Sos, M.Si Cilacap, 15-07-1960
110042607 / 19600715 198912 1 001
III/b 01-04-2010
PENDIDIKAN
STATUS
18
Bondan Dwi Utomo, SE Tangerang. 02-07-1986
19860702 201012 1 001
III/a 01-12-2010
Sarjana (S1)
Ekonomi
Tgl. 30-06-2010
Univ. Sebelas Maret
19
Herry Suryodarsono Kediri, 26-05-1967
19670526 200812 1 001
II/a 01-12-2008
SMA
Fisika
tgl. 30-04-1985
20
Damiri Bogor, 12-03-1970
19700312 200911 1 001
I/c 01-11-2009
SMP
-
Tgl. 16-06-1988
SMP Bojong Gede, Bogor
Pelaksana Adiministrasi
Pusat
21
Darso Cilacap, 06-07-1960
110064238 / 19600706 200604 1 001
I/b 01-10-2011
SD
-
Tgl. 01-01-1973
SD Ciruyung, Cilacap
Pelaksana Adiministrasi
Pusat
KET
11
GOL/
TINGKAT
NO
NAMA / TGL. LAHIR
NIP
RUANG TMT
PENDIDIKAN
JURUSAN
PENDIDIKAN TAHUN LULUS
ALUMNI
JABATAN
KEPEGAWAIAN
STATUS
1
2
3
4
5
6
7
8
9
10
110037042 / 19590908 198707 1 002
IV/b 01-04-2011
1.Sarjana (S1)
T. Sipil
Tgl. 10-1-1985
Univ. Diponegoro
Kasubdit. Sisdal II Tgl. 24-1-2011
Pusat
2.Pasca Sarja (S2)
T. Sipil Jalan Raya
Tgl. 21-09-1998
ITB
1.Sarjana (S1)
T. Sipil
Tgl. 1-1-1989
Univ. Trisakti Jakarta
Kasi. Pengendalian Wil. II Tgl. 24-1-2011
Pusat
2.Sarjana (S2)
Master Of Civil Eng. Bid.Civil Engineering
Tgl. 1-1-2005
Univ. New South Wales, Australia
1.Sarjana (S1)
Ekonomi Manajemen
Tgl.22-7-1983
UPN Yogyakarta
Penelaah Kinerja
Pusat
2.Pasca Sarjana (S2)
Ilmu Amdministrasi
Tgl.12-5-2008
STIAMI Jakarta
Tgl. 26-08-2002
Univ. Indonesia
Penelaah Kinerja
Pusat
Pengadimintrasian Umum
Pusat
SUB DIREKTORAT SISTEM PENGENDALIAN WILAYAH II 1
Ir. Tasripin Sartiyono, MT Demak, 08-09-1959
A
Seksi Pengendalian Penyiapan Pelaksanaan Wilayah II
2
Ir. Yudiarmand Zulkarnain Kasim,M.Eng.Sc Jakarta, 14-05-1963
3
Dra. Hutami Suraswati, M.Si Klaten, 10-04-1964
110044317 / 19630514 199003 1 007
110050522 / 19640410 199303 2 002
IV/a 01-04-2006
IV/a 01-10-2009
4
Edwi Kusumawati, ST, MT Jakarta, 30-03-1975
110057356 / 19750330 200502 2 001
III/d 01-04-2013
Pasca Sarjana (S2)
T. Sipil
5
Ratna Yuliati, SE Solo, 08-07-1965
110047544 / 19650708 199202 2 001
III/d 01-04-2013
1.SMA
IPS
Tgl.23-4-1985
SMAK Sragen
2.Sarjana (S1)
Ek. Manajement
Tgl. 1-7-1993
Univ. Prof. Dr. Moestopo
6
Ratno Adi Setiawan, ST, MT Bogor, 14-05-1984
19840514 200912 1 002
III/b 01-12-2009
Pasca Sarjana (S2)
T. Sipil
Tgl. 25-10-2008
Univ. Parahyangan
Pengintegrasi Perencanaan Program
Pusat
7
Muhammad Rendisyah Afni, ST Jakarta, 08-08-1987
19870808 201012 1 001
III/a 01-12-2010
Sarjana (S1)
T. Sipil
Tgl. 23-10-2010
ITB
Pengintegrasi Perencanaan Program
Pusat
B
Seksi Pengendalian Pelaksanaan Wilayah II
8
Sudirman, ST Bukit Tinggi, 21-04-1960
110038268 / 19600421 198703 1 004
III/c 01-10-2010
1.SMA
IPA Teknik Jalan dan Jbt T. Sipil
Kasi. Pengendalian Pelaks. Wil.II Tgl. 24-1-2011
Pusat
Penelaah Kinerja
Pusat
Diploma III
2.Sarjana (S1) 10
Yunita Kiki Sani, ST, M.Eng.Sc Malang, 25-03-1980
110057928 / 19800325 200604 2 002
III/b 01-04-2010
Tgl. 29-4-1981 SMAN 16 Jakarta Tahun 1991 – 1993 LPPU-ITB Tgl. 30-6-2006 Univ. Mercubuana Jakarta
1.Sarjana (S1)
T. Sipil
Tgl. 28-07-2010
ATPUT Yogyakarta (UGM)
2.Pasca Sarjana (S2)
Transportation Engr. & Manajemen Ait
Tgl. 26-05-2010
Asian Institut Technologi, Thailand
10
Martina Piranti, S.Sos Jakarta 20-03-1985
19850320 201012 2 006
III/a 01-12-2010
Sarjana (S1)
Komunikasi
Tgl. 9-3-2007
Univ. Pelita Harapan
Penelaah Kinerja
Pusat
11
Dwi Wuryanti, ST Kebumen, 16-12-1986
19861216 200912 2 001
III/a 01-12-2009
Sarjana (S1)
T. Sipil
Tgl. 19-8-2009
UGM
Pengintegrasi Perencanaan Program
Pusat
12
P. Sutomo Jakarta, 18-03-1961
110041632 / 19610318 198903 1 002
II/c 1-4-2007
ST.
Mesin
Tgl. 10-12-1977
ST Jakarta
Pengadminitrasi Umum
Pusat
KET
11
GOL/
TINGKAT
PENDIDIKAN
STATUS
NO
NAMA / TGL. LAHIR
NIP
RUANG TMT
PENDIDIKAN
JURUSAN
TAHUN LULUS
ALUMNI
JABATAN
KEPEGAWAIAN
1
2
3
4
5
6
7
8
9
10
110041216 / 19640520 198903 1 020
IV/b 01-10-2009
1.Sarjana (S1)
T. Sipil
ITS
Kasubdit. Wilayah II A
Pusat
2.Pasca Sarjana (S2)
Master Of Science in Transport Planing And engineering
1.STM (B. Gedung)
B. Gedung
Tgl.09-12-1977
Kasi. Penyiapan Pelaksanaan Wilayah II A Tgl. 1-12-2012
Pusat
2.IKIP.
T. Sipil
Tgl. 19-11-1982
IKIP Semarang
3.S1. (Sarjana)
Ekonomi Majemen
Tgl. 06-04-2009
STIE Puri Purna Jakarta
SUB DIREKTORAT WILAYAH II A (BANTEN, DKI, JAWA BARAT) 1
Ir. Thomas Setiabudi Aden, M.Sc.Eng Bandung, 20-05-1964
A
Seksi Penyiapan Pelaksanaan Wilayah II A
2
M. Adi Sulistijono, B.Sc, SE Semarang, 06-08-1958
110036592 / 19580806 198603 1 006
III/d 01-04-2013
Tgl. 01-01-1987
Leedrs, Inggris
3
Jhon Frit Aldis Sitompul, ST Sorong, 04-05-1983
110063500 / 19830504 200801 1 001
III/b 01-04-2012
Sarjana (S1)
T. Sipil
Tgl. 01-01-2007
Univ. Atmajaya, Yogyakarta
Pengintegrasi Perencanaan Program
Pusat
4
Sri Waliyani Bantul, 13-12-1959
110034296 / 19591213 198503 2 000
III/b 01-04-2004
SMEA
Tata Buku
Tgl. 31-12-1977
SMEAN Bantul
Pengadministrasian Umum
Pusat
5
Muryanti Rahayu Kulon Progo, 16-02-1961
110041506 / 19610216 198903 2 001
III/b 01-04-2008
SMEA
Tata Niaga
Tgl.08-05-1980
SMEA Yogyakarta
Pengadministrasian Umum
Pusat
6
Grace Agustina Togatorop, ST Batam, 05-08-1987
19870805 200912 2 001
III/a 01-12-2009
Sarjana (S1)
T. Sipil
Tgl. 29-08-2009
Univ. Parahyangan
Pengintegrasi Perencanaan Program
Pusat
B
Seksi Pelaksanaan Wilayah II A
7
Ir. Bambang Suryono, M.Sc Malang, 17-09-1957
19570917 198603 1 007
IV/a 01-10-2003
1. Sarjana (S1)
T. Sipil
Tgl. 17-10-1984
Univ. Diponegoro
Kasi. Pelaksanaan Wil. II A
Pusat
2. Pasca Sarjana (S2)
T. Jalan Raya
Tgl. 08-11-1995
Inggris
8
Wenny Puspasari, SH Jakarta, 18-05-1960
110045467 / 19600518 199102 2 001
III/c 01-04-2010
1. SMA 2. Sarjana (S1)
IPS Hukum Pidana
5-5-1979 Tgl. 29-10-1991
SMAN 24 Jakarta Univ. Pancasila, Jakarta
Penelaah Kinerja
Pusat
9
Bintara Sukma Mulyadi, S.Sos Bandung, 11-01-1958
110049024 / 19580111 199203 1 001
III/b 01-04-2008
1. SMA 2. Sarjana (S1)
IPS Adm. Negara
SMA Kastria Jakarta STIAMI Jakarta
Pengadministrasian Umum
Pusat
Tgl. '01-01-2007
Djumakir Gunung Kidul, 08-07-1961
110042590 / 19610708 198912 1 001
III/a 01-04-2012
1.SMP
-
Tgl. 5-5-1979
SMP Wonodadi
Pengadministrasian Umum
Pusat
SMA
IPS
Tgl.14-08-1997
SMA Jakarta
10
11
Pungki Enggar Paweninggale, ST Mojokerto, 28-04-1987
19870428 201012 1 002
III/a 01-12-2010
Sarjana (S1)
T. Sipil
Tgl. 30-03-2010
Univ. Brawijaya
Penelaah Kinerja
Pusat
12
Hartono, ST Indramayu, 23-10-1983
19831023 201012 1 002
III/a 01-12-2010
Sarjana (S1)
T. Sipil
Tgl. 14-08-2006
Univ. Parahyangan
Penelaah Kinerja
Pusat
KET
11
NO
GOL/
TINGKAT
NAMA / TGL. LAHIR
NIP
RUANG TMT
PENDIDIKAN
JURUSAN
TAHUN LULUS
ALUMNI
JABATAN
KEPEGAWAIAN
2
3
4
5
6
7
8
9
10
110035063 / 19580514 198503 1 013
IV/b 01-04-2009
1. Sarjana (S1)
T. Sipil
Tgl. 26-03-1983
ITB
Kasubdit. Wilayah II B
Pusat
2.Pasca Sarjana (S2)
Magertes Teknik
Tgl. 07-07-2001
ITB
Univ. Diponegoro
Kasi. Penyiapan Pelaksanaan Wil. II B Tgl. 24-01-2011
Pusat
Pengintegrasi Prencanaan Program
Pusat
1
PENDIDIKAN
STATUS
SUB DIREKTORAT WILAYAH II B (JAWA TENGAH, DIY & JAWA TIMUR) 1
Ir. Zamharir Basuni, M.MT Palembang, 15-04-1958
A
Seksi Penyiapan Pelaksanaan Wilayah II B
2
Ir. R.M. Bambang Nugoho Jakarta, 29-04-1958
'110045735 / '19580429 199103 1 001
III/d 01-04-2002
Sarjana (S1)
T. Sipil
3
Herman Wahyudhi, S.Kom, SH, MT Balikpapan, 18-03-1974
'110056374 / 19740318 200212 1 001
III/c 01-04-2011
1.Sarjana (S1)
T. Komputer
Tgl.22-10-1999
Univ. Gunadarma Jakarta
2.Sarjana (S1)
Hukum
Tgl. 2000
Univ. Indonesia
3. Pasca Sarjana (S2)
Studi Pembangunan
Tgl. 2009
ITB
Tgl. 16-07-2004
4
Muchsinun, BE Purworejo, 20-11-1957
'110035924 19571120 198602 1 003
III/c 01-10-2006
Sarmud (D111)
Pemb. Jalan Kota
Tgl. 20-12-1986
LPPU - ITB
Pengintegrasi Prencanaan Program
Pusat
5
Mahyudin Jakarta, 12-03-1960
'110044791 / 19600312 199012 1 001
III/b 01-04-2011
SMA
IPS
Tgl. 05-10-1980
SMA Jakarta
Pengintegrasi Prencanaan Program
Pusat
6
Herianto Rammang Membia, ST Rantepao, 11-11-1984
198411111 201012 1 003
III/a 01-12-2010
Sarjana (SI)
T. Sipil
Tgl. 25-06-2006
Univ. Pelita Harapan
Pengintegrasi Prencanaan Program
Pusat
7
Eko Indrawati, ST Malang, 27-03-1984
19840327 201012 2 001
III/a 01-12-2010
Sarjana (SI)
T. Sipil
Tgl. 08-02-2007
Univ. Brawijaya
Pengintegrasi Prencanaan Program
Pusat
B
Seksi Pelaksanaan Wilayah II B
8
Ir. Beni Fariati Handayani Mrih rahayu, MT Yogyakarta, 05-10-1964
110059165 / 19641005 199502 2 001
IV/a 01-04-2011
1.Sarjana (S1)
T. Sipil
Tgl. 01-05-1992
UII - Yogyakarta
Kasi. Pelaksanaan Wilayah II B Tgl. 11-03-2013
Pusat
2.Pasca Sarjana (S2)
Magister Teknik
Tgl. 05-03-2005
ITB
9
Aditya Viko Vignata, ST Malang, 23-08-1985
198508232008121001
III/b 01-04-2013
Sarjana (S1)
T. Sipil
01-12-2006
Univ. Brawijaya
Penelaah Kinerja
Pusat
10
R.A. Astri Widyanitya, ST Semarang, 24-09-1985
19850924 200912 2 001
III/a 01-12-2009
Sarjana (SI)
T. Sipil
Tgl. '13-09-2007
Univ. Diponegoro
Penelaah Kinerja
Pusat
11
Rokib Jakarta, 05-12-1960
110059861 / 19600512 200604 1 005
I/d 01-04-2010
SMP
-
Tgl. 01-01-1981
SMP Cipulir Jakarta
Pengadministrasi Umum
Pusat
KET
11
GOL/
TINGKAT
NO
NAMA / TGL. LAHIR
NIP
RUANG TMT
PENDIDIKAN
JURUSAN
PENDIDIKAN TAHUN LULUS
ALUMNI
JABATAN
KEPEGAWAIAN
STATUS
1
2
3
4
5
6
7
8
9
10
'110041178 / 19600708 198903 1 002
IV/b 01-04-2009
Univ. Syah Kuala, Aceh
Kasubdit. Wilayah II C Tgl. 20-07-2012
Pusat
SUB DIREKTORAT WILAYAH C (BALI, NTB & NTT) 1
Ir. Susalit Alius, CES Banda Aceh, 08-07-2960
1. Sarjana (SI)
T. Sipil
2. Pascasarjana (S2)
Civil Engineering
Tgl. 28-07-1987 15-09-1993
ENTPE, Lyon Prancis
Tgl. 05-02-1985
Univ. Sebelas Maret
Kasi. Penyiapan Pelaksanaan Wil. II C
Pusat
Pengadministrasi Umum
Pusat
A
Seksi Penyiapan Pelaksanaan Wilayah II C
2
Ir. Hari Satyawan Surakarta, 24-05-1958
110036524 / 19580524 198603 1 003
III/d 01-04-1998
Sarjana (SI)
T. Sipil
3
D. Herta Parapat, S.Sos, M.Si Sidikalang, 01-01-1963
110044870 / 19630101 199101 2 001
III/c 01-10-2012
1. SMA
IPA
Tgl. 06-05-1982
SMAN 32 Jakarta
2. Sarjana (SI) 3. Pasca Sarjana (S2)
Adm. Negara Ilmu Administrasi
Tgl. 01-01-2006 Tgl. 14-04-2008
STIAMI Jakarta STIAMI Jakarta
4
Amia Sarah, ST Jakarta, 09-24-1985
19850924 200912 2 001
III/a 01-12-2009
Sarjana (SI)
T. Sipil
Tgl. 02-09-2006
Univ. Indonesia
Penelaah Informasi & Laporan
Pusat
5
Ratih Purnama Sari, ST Bandung, 18-01-1988
198801108 201012 2 003
III/a 01-12-2010
Sarjana (SI)
T. Sipil
Tgl. 29-07-2010
Univ. Parahyangan
Penelaah Anggaran & PNPB
Pusat
B
Seksi Pelaksanaan Wilayah II C
6
Erna Wijayanti, ST, M.Sc Semarang, 08-05-1980
110057342 / 19800508 200502 2 001
III/c 01-04-2013
Kasi. Pelaksanaan Wilayah II C Tgl. 1-12-2012
Pusat
Penelaah Kinerja
Pusat
7
Robedo F.H. Simanjuntak, ST, MT Jakarta, 22-07-1976
110057379 / 19760722 200502 1 001
III/c 01-04-2013
1.S1 (Sarjana)
T. Sipil
Tgl. 27-08-2004
Univ. Diponegoro
2.Pasca Sarjana (S2)
Magister Transprt.
Tgl. 30-10-2008
UGM
1.Sarjana (SI)
T. Sipil
Tgl. 18-10-2003
ITB
2. Pasca Sarjana (S2)
Magister Teknik
Tgl. 19-10-2012
ITB
8
Hoctri Efendi Hutagalung, ST Riau, 03-10-1987
19871003 201012 1 005
III/a 01-12-2010
Sarjana (SI)
T. Sipil
Tgl. 23-10-2010
ITB
Penelaah Kinerja
Pusat
9
Mahmah Dian Mahendra, ST Malang, 14-4-1983
19830414 201012 1 001
III/a 01-12-2010
Sarjana (S1)
T. Sipil
Tgl. 27-8-2009
ITS
Penelaah Kinerja
Pusat
KET
11
NO
GOL/
TINGKAT
NAMA / TGL. LAHIR
NIP
RUANG TMT
PENDIDIKAN
JURUSAN
TAHUN LULUS
ALUMNI
JABATAN
KEPEGAWAIAN
2
3
4
5
6
7
8
9
10
110037391 / 19580817 198603 1 003
IV/a 01-10-2008
1.Sarjana (S1)
T. Sipil
Tgl. 22-10-1983
ITB
Kasubdit Wilayah II D Tgl. 20-07-2012
Pusat
2.Pasca Sarjana (S2)
Manajemen
Tgl. 01-01-2008
LPMI - jakarta
1.Sarjana (S1)
T. Sipil
Tgl. 19-08-1985
Univ. Brawijaya
Kasi. Pelaksanaan Penyiapan Wil. II D
Pusat
2.Pasca Sarjana (S2)
Magister Teknik
Thn. 2004
ITS
1. Sarmut. (DIII)
Adm Negara
Tgl. 30-12-1986
AAN Jakarta
Pengadminitrasi Umum
Pusat
Tgl. 2005
Pengintegrasi Perencanaan Program
Pusat
1
PENDIDIKAN
STATUS
SUB DIREKTORAT WILAYAH II D (KALBAR, KALTENG, KALSEL & KALTIM) 1
Ir. Solo Riyadi Limbong, MM Samosir, 17-08-1958
A
Seksi Penyiapan Pelaksanaan Wilayah II D
2
Ir. Birviq Ady Sanjaya, M.MT Gresik, 07-04-1962
3
Emy Sulistyowati, S.Sos Yogyakarta, 26-5-1959
4
110041544 / 19620407 198903 1 001
IV/a 01-10-2010
110047399 / 19590526 199103 2 001
III/c 01-10-2009
2.Sarjana (S1)
Adm. Negara
Chandra Prastiya, ST Banjarnegra, 26-1983
19830126 200912 1 001
III/a 01-12-2009
Sarjana (S1)
T. Sipil
5
Akhdiat Fajar Wijaya Kusuma, ST Surakarta, 05-01-1986
19860105 201012 1 004
III/a 01-12-2010
Sarjana (S1)
T. Sipil
Tgl. 12-08-2010
ITS Pengintegrasi Perencanaan Program
Pusat
6
Fanny Novianrie Silvianna, ST, MM Bandung, 08-11-1982
19821108 201012 2 003
III/b 01-04-2013
Sarjana (S1) Pasca Sarjana (S2)
T. Spil Magister Manajemen
Tgl. 27-05-2005 Tgl. 24-03-2010
Univ. Maranata Univ. Pajajaran
Pengintegrasi Perencanaan Program
Pusat
B
Seksi Pelaksanaan Wilayah II D
7
Ir. Bowo Sudiatmanto, MT Denpasar, 23-4-1965
110051468 / '19650423 199312 1 001
IV/a 01-04-2010
Kasi. Pelaksanaan Wil. II D
Pusat
STIAMI Jakarta Univ. Sebelas Maret
1.Sarjana (S1)
T. Sipil
Tgl. 3-8-192
Univ. Pancasila Jakarta
2.Pasca Sarjana (S2)
Sistem dan Teknik Jalan Raya
Thn. 2005
ITB
8
Medi Iskandar Malang, 17-05-1964
110047509 / 19640517 199202 1 002
III/b 01-04-2011
STM
Bangunan
Tgl. 30-04-1984
STM Bandung
Penelaah Data Keuangan
Pusat
9
Agnylla Palupi Arthi, ST Surabaya, 30-10-1984
110063527 / 19841030 200801 2 016
III/b 01-04-2012
Sarjana (S1)
T. Sipil
Tgl. 27-10-2007
ITB
Penelaah Kinerja
Pusat
10
Novik Kurohman, ST Palangkarya, 19-11-1986
19861119 200812 1 001
III/a 01-12-2009
Sarjana (S1)
T. Sipil
TGl. 19-11-1986
Univ. Islam Indonesia, Yogyakarta
Penelaah Kinerja
11
Ginanjar Habib Supriyadi, ST Bandung, 09-01-1985
19850109 201012 1 002
III/a 01-12-2010
Sarjana (S1)
T. Sipil
Tgl. 21-07-2007
ITB
Penelaah Pelaksanaan
Pusat
KET
11
TABEL III.2. DAFTAR NOMINATIF PEGAWAI NON PNS (PEGAWAI HARIAN) DIREKTORAT BINA PELAKSANAAN WILAYAH II PENDIDIKAN
TINGKAT
KET
NO
NAMA
TGL. LAHIR
GOL
STATUS
PENDIDIKAN
JURUSAN
TAHUN LULUS
ALUMNI
JABATAN
1
2
3
4
5
6
7
8
9
10
11
Jakarta, 13 Juni 1981
II
1/2
1. Sarmud (D.III)
Studi Manajemen
21-11-2003
Pengadministrasi Keuangan
Kategori I
2. Sarjana (S1)
Ilmu Adm. Publik
2013
Univ. Persada Indonesia YAI - Jakarta STIAMI - Jakarta
1
Yunaeni Handayani, SAP
2
Achmad Faqih
Jakarta, 21 November 1976
II
1/3
SMA
IPS
02-06-1997
SMU Kartika X-1, Jakarta
Pengadministrasi Umum
Kategori I
3
Suparman
Ciamis, 14 Januari 1961
I
1/2
SD
-
1975
SDN Sukasari 2, Ciamis
Pengemudi
Kategori I
4
Edy Purwanto
Tangerang, 5 Desember 1974
I
1/4
SD
-
06-06-1987
SDN Ciputat V, Tangerang
Pramusaji
Kategori I
5
Dwi Putro Nagoro, SE
Jakarta, 23 April 1987
III
-
Sarjana (S1)
Manajemen
28-02-2009
STIE GICI Business School, Jakarta
Pengadministrasi Keuangan
6
Ratih Herawati, A.Md
Jakarta, 1 April 1974
II
1/4
Sarmud (D.III)
Akuntansi
09-05-1996
Akademi Akuntansi Y.A.I Jakarta
Pengadministrasi Umum
7
Desi Lestyaningrum
Jakarta, 19 Desember 1978
II
-
SMA
IPS
02-06-1997
SMU Muhammadiyah 3, Jakarta
Pengadministrasi Umum
8
Agustin Hirawati
Jakarta, 14 Agustus 1989
II
-
SMK
Akuntansi
16-06-2007
SMK Purnama 2, Jakarta
Pengadministrasi Umum
9
Putri Wulandari, S.Pd
Purworejo, 11 Juni 1987
II
-
Sarjana (S1)
Pendidikan IPS
03-04-2010
UIN-Syarief Hidayatullah, Jakarta
Pengadministrasi Umum
10
Shandra Wijaya
Bogor, 20 Juni 1979
II
-
SMK
11
Mardjuki
Jakarta, 8 Juli 1966
II
-
SMA
12
Agung Pranoto
Jakarta, 7 Juli 1986
II
-
SMK
13
Kusworo
Cilacap, 2 Februari 1981
II
1/3
SMA
14
Karyo
Cirebon, 13 Januari 1981
I
1/2
SMP
15
Ali. Mubasir
Bumi Ayu, 5 Januari 1954
I
1/2
SMP
1998
Pengemudi
PHL
Pengemudi
PHL
Pramusaji
PHL
Pramusaji
PHL
-
Pengemudi
PHL
-
Pengemudi
PHL
Sekretaris
SMKN 47 Jakarta
III.4. Sub Direktorat Sistem Pengendalian Wilayah II III.4.1. Tugas dan Fungsi (Tusi) TUGAS : 1. 2. 3. 4. 5.
Melaksanakan : Penyusunan rencana pembinaan penyiapan pelaksanaan dan pelaksanaan, pengendalian pemanfaatan jalan nasional, provinsi, kabupaten, kota dan desa, Koordinasi pelaksanaan konstruksi jalan yang bersumber dari Pinjaman dan Hibah Luar Negeri, Rencana fasilitasi penyelenggaraan jalan provinsi, kabupaten, kota dan desa di wilayah P. Jawa, Bali, Kep. Nusa Tenggara dan Kalimantan, Koordinasi penyusunan rencana kegiatan Ditbinlak Wil. II dan Koordinasi penyusunan laporan Akuntabilitas Kinerja Bina Pelaksanaan Wilayah II.
FUNGSI : 1. 2. 3. 4. 5. 6.
Penyiapan rencana pengendalian pembinaan pelaksanaan jalan nasional; Penyusunan rencana dan inventarisasi pengadaan tanah jalan nasional; Penyiapan petunjuk pelaksanaan dan sosialisasi pengadaan tanah; Pelaksanaan fungsi unit penjamin mutu Ditbinlak wilayah II; Koordinasi penyiapan bahan usulan untuk menyusun program jangka menengah dan tahunan penanganan jalan; Koordinasi pengusulan program penanganan jalan provinsi, kab, kota dan desa yang dibiayai oleh Dana Alokasi Khusus (DAK) dan dana pusat lainnya; 7. Koordinasi penyusunan rencana kegiatan Ditbinlak Wilayah II; 8. Penyusunan Laporan Akuntabilitas Kinerja Ditbinlak Wilayah II; 9. Koordinasi pelaksanaan konstruksi jalan yang bersumber dari PHLN; 10. Koordinasi rencana fasilitasi penyelenggaraan jalan provinsi, kab, kota dan desa ; dan 11. Pelaksanaan evaluasi tingkat kelaikan jalan nasional.
III.4.2. Seksi Pengendalian Penyiapan Pelaksanaan Wilayah II Seksi Pengendalian Penyiapan Pelaksanaan Wilayah II mempunyai tugas melakukan penyiapan bahan penyusunan rencana pembinaan penyiapan pelaksanaan mulai dari penyusunan program sampai dengan penandatanganan kontrak konstruksi untuk jalan nasional, provinsi, kabupaten, kota, dan desa, bahan koordinasi penyusunan rencana kegiatan Direktorat Bina Pelaksanaan Wilayah II, dan bahan koordinasi penyusunan Laporan Akuntabilitas Kinerja Direktorat Bina Pelaksanaan Wilayah II. (berdasarkan pasal 494). III.4.3. Seksi Pengendalian Pelaksanaan Wilayah II Mempunyai tugas melakukan penyiapan bahan penyusunan rencana pembinaan pelaksanaan setelah penandatanganan kontrak konstruksi dan pembinaan pengendalian pemanfaatan jalan nasional, provinsi, kabupaten, kota, dan desa, bahan koordinasi pelaksanaan konstruksi jalan yang bersumber dari Pinjaman dan Hibah Luar Negeri di wilayah Pulau Jawa, Bali, Kepulauan Nusa Tenggara dan Kalimantan, serta bahan rencana fasilitasi penyelenggaraan jalan provinsi, kabupaten, kota, dan desa di wilayah Pulau Jawa, Bali, Kepulauan Nusa Tenggara dan Kalimantan (berdasarkan pasal 494). III.4.4. Sumber Daya Manusia (SDM) Sumber daya manusia (SDM) yang mendukung kegiatan Sub. Direktorat Sistem Pengendalian Wilayah II berjumlah 12 (dua belas) orang yang terdiri dari : Berdasarkan Tingkat Pendidikan (orang) S3
S2
S1
D3
SLTA
SLTP
SD
JUMLAH
-
6
5
-
-
-
-
12 Orang
Berdasarkan Tingkat Golongan (orang) GOL. IV
GOL. III
GOL. II
GOL. I
JUMLAH
3
8
1
-
12 Orang
III.5. Sub. Direktorat Wilayah II A III.5.1. Tugas dan Fungsi (Tusi) TUGAS : Subdirektorat Wilayah II mempunyai tugas melaksanakan pembinaan penyiapan pelaksanaan dan pelaksanaan, pengendalian pemanfaatan jalan nasional, provinsi, kabupaten, kota, dan desa meliputi wilayah Provinsi Banten, DKI Jakarta, dan Jawa Barat. Dalam melaksanakan tugas sebagaimana dimaksud pada Pasal 496, Subdirektorat Wilayah II A menyelenggarakan fungsi : FUNGSI : 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15.
Penyiapan bahan usulan untuk menyusun program jangka menengah dan tahunan penanganan jalan; Penilaian usulan program penanganan jalan nasional dari balai besar pelaksanaan jalan nasional; Penilaian usulan program penanganan jalan provinsi, kabupaten, kota, dan desa yang dibiayai oleh Dana Alokasi Khusus dan dana pusat lainnya; Fasilitasi penyusunan program jalan provinsi, kabupaten, kota, dan desa; Fasilitasi penyiapan pelaksanaan dan pelaksanaan jalan provinsi, kabupaten, kota, dan desa termasuk bimbingan teknis; Pembinaan dan bimbingan teknis penyiapan pelaksanaan dan pelaksanaan pekerjaan jalan nasional termasuk jalan bebas hambatan; Pemantauan pelaksanaan pengadaan tanah jalan nasional; Fasilitasi penyesuaian kontrak yang merubah target DIPA; Fasilitasi pengendalian pemanfaatan bagian-bagian jalan; Pemantauan dan evaluasi pemanfaatan bahan dan peralatan jalan; Penyiapan penetapan laik fungsi jalan nasional; Pembinaan penanggulangan darurat, dan pemantauan dan evaluasi Penanganan Bencana Alam; Pemantauan dan penyiapan bahan evaluasi kinerja penyedia jasa; Fasilitasi penyusunan leger jalan provinsi, kabupaten, kota, dan desa; dan Koordinasi penyelesaian laporan hasil pemeriksaan.
III.5.2. Seksi Penyiapan Pelaksanaan Wilayah II A Seksi Penyiapan Pelaksanaan Wilayah II A mempunyai tugas melakukan penyiapan bahan pembinaan penyiapan pelaksanaan mulai dari penyusunan program sampai dengan penandatanganan kontrak konstruksi untuk jalan nasional, dan bahan fasilitasi penyiapan pelaksanaan jalan provinsi, kabupaten, kota, dan desa di Provinsi Banten, DKI Jakarta, dan Jawa Barat (berdasarkan pasal 498). III.5.3. Seksi Pelaksanaan Wilayah II A Seksi Pelaksanaan Wilayah II A mempunyai tugas melakukan penyiapan bahan pembinaan pelaksanaan setelah penandatanganan kontrak konstruksi dan bahan pembinaan pengendalian pemanfaatan jalan nasional, dan bahan fasilitasi pelaksanaan jalan dan bahan pengendalian pemanfaatan jalan provinsi, kabupaten, kota, dan desa di Provinsi Banten, DKI Jakarta, dan Jawa Barat (berdasarkan pasal 498). III.5.4. Sumber Daya Manusia (SDM) Sumber Daya Manusia yang mendukung kegiatan Sub. Direktorat Wilayah II A berjumlah 12 (dua belas) orang yang terdiri dari: Berdasarkan Tingkat Pendidikan (orang) S3
S2
S1
D3
SLTA
SLTP
SD
Jumlah
-
2
7
-
3
-
-
12 Orang
Berdasarkan Tingkat Golongan (orang) GOL.IV
GOL.III
GOL.II
GOL.I
Jumlah
2
10
-
-
12 Orang
III.6. Sub. Direktorat Wilayah II B III.6.1. Tugas dan Fungsi (Tusi) TUGAS : Subdirektorat Wilayah II mempunyai tugas melaksanakan pembinaan penyiapan pelaksanaan dan pelaksanaan, pengendalian pemanfaatan jalan nasional, provinsi, kabupaten, kota, dan desa meliputi meliputi wilayah Provinsi Jawa Tengah, DI.Yogyakarta, dan Jawa Timur. Dalam melaksanakan tugas sebagaimana dimaksud pada Pasal 499, Subdirektorat Wilayah II B menyelenggarakan fungsi : FUNGSI : 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15.
Penyiapan bahan usulan untuk menyusun program jangka menengah dan tahunan penanganan jalan; Penilaian usulan program penanganan jalan nasional dari balai besar pelaksanaan jalan nasional; Penilaian usulan program penanganan jalan provinsi, kabupaten, kota, dan desa yang dibiayai oleh Dana Alokasi Khusus dan dana pusat lainnya; Fasilitasi penyusunan program jalan provinsi, kabupaten, kota, dan desa; Fasilitasi penyiapan pelaksanaan dan pelaksanaan jalan provinsi, kabupaten, kota, dan desa termasuk bimbingan teknis; Pembinaan dan bimbingan teknis penyiapan pelaksanaan dan pelaksanaan pekerjaan jalan nasional termasuk jalan bebas hambatan; Pemantauan pelaksanaan pengadaan tanah jalan nasional; Fasilitasi penyesuaian kontrak yang merubah target DIPA; Fasilitasi pengendalian pemanfaatan bagian-bagian jalan; Pemantauan dan evaluasi pemanfaatan bahan dan peralatan jalan; Penyiapan penetapan laik fungsi jalan nasional; Pembinaan penanggulangan darurat, dan pemantauan dan evaluasi Penanganan Bencana Alam; Pemantauan dan penyiapan bahan evaluasi kinerja penyedia jasa; Fasilitasi penyusunan leger jalan provinsi, kabupaten, kota, dan desa; dan Koordinasi penyelesaian laporan hasil pemeriksaan.
III.6.2. Seksi Penyiapan Pelaksanaan Wilayah II B Seksi Penyiapan Pelaksanaan Wilayah II B mempunyai tugas melakukan penyiapan bahan pembinaan penyiapan pelaksanaan mulai dari penyusunan program sampai dengan penandatanganan kontrak konstruksi untuk jalan nasional, dan bahan fasilitasi penyiapan pelaksanaan jalan provinsi, kabupaten, kota, dan desa di Provinsi Jawa Tengah, DI.Yogyakarta, dan Jawa Timur (sesuai pasal 502).
III.6.3. Seksi Pelaksanaan Wilayah II B Seksi Pelaksanaan Wilayah II B mempunyai tugas melakukan penyiapan bahan pembinaan pelaksanaan setelah penandatanganan kontrak konstruksi dan bahan pembinaan pengendalian pemanfaatan jalan nasional, dan bahan fasilitasi pelaksanaan jalan dan bahan pengendalian pemanfaatan jalan provinsi, kabupaten, kota, dan desa di Provinsi Jawa Tengah, DI.Yogyakarta, dan Jawa Timur (sesuai pasal 502).
III.6.4. Sumber Daya Manusia (SDM) Sumber Daya Manusia yang mendukung kegiatan Sub. Direktorat Wilayah II B berjumlah 11 (sebelas) orang terdiri dari : Berdasarkan Tingkat Pendidikan (orang) S3 -
S2 3
S1 5
D3 1
SLTA 1
Berdasarkan Tingkat Golongan (orang) Gol. IV
Gol. III
Gol. II
Gol. I
Jumlah
2
8
-
1
11 Orang
SLTP 1
SD -
Jumlah 11 Orang
III.7. Sub. Direktorat Wilayah II C III.7.1. Tugas dan Fungsi (Tusi) TUGAS : Subdirektorat Wilayah II mempunyai tugas melaksanakan pembinaan penyiapan pelaksanaan dan pelaksanaan, pengendalian pemanfaatan jalan nasional, provinsi, kabupaten, kota, dan desa meliputi wilayah Provinsi Bali, Nusa Tenggara Barat dan Nusa Tenggara Timur, dalam melaksanakan tugas sebagaimana dimaksud di atas berdasarkan pasal 503, Sub.direktorat Wilayah II C menyelenggara kan fungsi : FUNGSI : 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15.
Penyiapan bahan usulan untuk menyusun program jangka menengah dan tahunan penanganan jalan; Penilaian usulan program penanganan jalan nasional dari balai besar pelaksanaan jalan nasional; Penilaian usulan program penanganan jalan provinsi, kabupaten, kota, dan desa yang dibiayai oleh Dana Alokasi Khusus dan dana pusat lainnya; Fasilitasi penyusunan program jalan provinsi, kabupaten, kota, dan desa; Fasilitasi penyiapan pelaksanaan dan pelaksanaan jalan provinsi, kabupaten, kota, dan desa termasuk bimbingan teknis; Pembinaan dan bimbingan teknis penyiapan pelaksanaan dan pelaksanaan pekerjaan jalan nasional termasuk jalan bebas hambatan; Pemantauan pelaksanaan pengadaan tanah jalan nasional; Fasilitasi penyesuaian kontrak yang merubah target DIPA; Fasilitasi pengendalian pemanfaatan bagian-bagian jalan; Pemantauan dan evaluasi pemanfaatan bahan dan peralatan jalan; Penyiapan penetapan laik fungsi jalan nasional; Pembinaan penanggulangan darurat, dan pemantauan dan evaluasi Penanganan Bencana Alam; Pemantauan dan penyiapan bahan evaluasi kinerja penyedia jasa; Fasilitasi penyusunan leger jalan provinsi, kabupaten, kota, dan desa; dan Koordinasi penyelesaian laporan hasil pemeriksaan.
III.7.2. Seksi Penyiapan Pelaksanaan Wilayah II C Seksi Penyiapan Pelaksanaan Wilayah II C mempunyai tugas melakukan penyiapan bahan pembinaan penyiapan pelaksanaan mulai dari penyusunan program sampai dengan penandatanganan kontrak konstruksi untuk jalan nasional, dan bahan fasilitasi penyiapan pelaksanaan jalan provinsi, kabupaten, kota, dan desa di Provinsi Bali, Nusa Tenggara Barat dan Nusa Tenggara Timur (berdasarkan pasal 506). III.7.3. Seksi Pelaksanaan Wilayah II C Seksi Pelaksanaan Wilayah II C mempunyai tugas melakukan penyiapan bahan pembinaan pelaksanaan setelah penandatanganan kontrak konstruksi dan bahan pembinaan pengendalian pemanfaatan jalan nasional, dan bahan fasilitasi pelaksanaan jalan dan bahan pengendalian pemanfaatan jalan provinsi, kabupaten, kota, dan desa di Provinsi Bali, Nusa Tenggara Barat dan Nusa Tenggara Timur. (berdasarkan pasal 506).
III.7.4. Sumber Daya Manusia (SDM) Sumber Daya Manusia yang mendukung kegiatan Sub. Direktorat Wilayah II C berjumlah 9 (sembilan) orang terdiri dari :
Berdasarkan Tingkat Pendidikan (orang) S3
S2
S1
D3
SLTA
SLTP
SD
Jumlah
-
4
5
-
-
-
-
9 Orang
Berdasarkan Tingkat Golongan (orang) Gol. IV
Gol. III
Gol. II
Gol. I
Jumlah
1
8
-
-
9 Orang
III.8. Sub. Direktorat Wilayah II D III.8.1. Tugas dan Fungsi (Tusi) TUGAS : Subdirektorat Wilayah II mempunyai tugas melaksanakan pembinaan penyiapan pelaksanaan dan pelaksanaan, pengendalian pemanfaatan jalan nasional, provinsi, kabupaten, kota, dan desa meliputi wilayah Provinsi Kalimantan Barat, Kalimantan Tengah, Kalimantan Timur, dan Kalimantan Selatan. sebagaimana dimaksud pasal 508, Sub Direktorat Wilayah II D menyelenggarakan fungsi : FUNGSI : 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15.
Penyiapan bahan usulan untuk menyusun program jangka menengah dan tahunan penanganan jalan; Penilaian usulan program penanganan jalan nasional dari balai besar pelaksanaan jalan nasional; Penilaian usulan program penanganan jalan provinsi, kabupaten, kota, dan desa yang dibiayai oleh Dana Alokasi Khusus dan dana pusat lainnya; Fasilitasi penyusunan program jalan provinsi, kabupaten, kota, dan desa; Fasilitasi penyiapan pelaksanaan dan pelaksanaan jalan provinsi, kabupaten, kota, dan desa termasuk bimbingan teknis; Pembinaan dan bimbingan teknis penyiapan pelaksanaan dan pelaksanaan pekerjaan jalan nasional termasuk jalan bebas hambatan; Pemantauan pelaksanaan pengadaan tanah jalan nasional; Fasilitasi penyesuaian kontrak yang merubah target DIPA; Fasilitasi pengendalian pemanfaatan bagian-bagian jalan; Pemantauan dan evaluasi pemanfaatan bahan dan peralatan jalan; Penyiapan penetapan laik fungsi jalan nasional; Pembinaan penanggulangan darurat, dan pemantauan dan evaluasi Penanganan Bencana Alam; Pemantauan dan penyiapan bahan evaluasi kinerja penyedia jasa; Fasilitasi penyusunan leger jalan provinsi, kabupaten, kota, dan desa; dan Koordinasi penyelesaian laporan hasil pemeriksaan.
III.8.2. Seksi Penyiapan Pelaksanaan Wilayah II D Seksi Penyiapan Pelaksanaan Wilayah II D mempunyai tugas melakukan penyiapan bahan pembinaan penyiapan pelaksanaan mulai dari penyusunan program sampai dengan penandatanganan kontrak konstruksi untuk jalan nasional, dan bahan fasilitasi penyiapan pelaksanaan jalan provinsi, kabupaten, kota, dan desa di Provinsi Kalimantan Barat, Kalimantan Tengah, Kalimantan Timur, dan Kalimantan Selatan. (berdasarkan pasal 510). III.8.3. Seksi Pelaksanaan Wilayah II D Seksi Pelaksanaan Wilayah II D mempunyai tugas melakukan penyiapan bahan pembinaan pelaksanaan setelah penandatanganan kontrak konstruksi dan bahan pembinaan pengendalian pemanfaatan jalan nasional, dan bahan fasilitasi pelaksanaan jalan dan bahan pengendalian pemanfaatan jalan provinsi, kabupaten, kota, dan desa di Provinsi Kalimantan Barat, Kalimantan Tengah, Kalimantan Timur, dan Kalimantan Selatan. (berdasarkan pasal 501)
III.8.4. Sumber Daya Manusia (SDM) Sumber Daya Manusia yang mendukung kegiatan Sub. Direktorat Wilayah II D berjumlah 11 (sebelas) orang terdiri dari :
Berdasarkan Tingkat Pendidikan (orang) S3
S2
S1
D3
SLTA
SMP
SD
Jumlah
-
3
7
-
1
-
-
11 Orang
Berdasarkan Tingkat Golongan (orang) Gol. IV
Gol. III
Gol. II
Gol. I
Jumlah
3
8
-
-
11 Orang
TABEL III.3. KAITAN FUNGSI DIREKTORAT WILAYAH DENGAN SUBDIREKTORAT DAN KEGIATAN No
FUNGSI DIREKTORAT WILAYAH
1.
Penyiapan rencana kegiatan penyelenggaraan jalan nasional dan pembinaan teknik termasuk bimbingan teknis penyelenggaraan jalan provinsi, kabupaten, kota & desa;
2.
Pembinaan pengadaan tanah jalan nasional;
SUBDIT SISDAL
SUBDIT WILAYAH
KEGIATAN YANG MENDAPAT DUKUNGAN SATKER DITWIL
(1) Penyiapan rencana pengendalian pembinaan pelaksanaan jalan nasional; (5) Koordinasi penyiapan bahan usulan (untuk menyusun program jangka menengah dan tahunan penanganan jalan; (4) Pelaksanaan fungsi unit penjamin mutu Ditbinlak wilayah II; (7) Koordinasi penyusunan rencana kegiatan Ditbinlak Wilayah II;
(1) Penyiapan bahan usulan untuk menyusun program jangka menengah dan tahunan penanganan jalan; (5) Fasilitasi penyiapan pelaksanaan dan pelaksanaan jalan provinsi, kabupaten, kota, dan desa termasuk bimbingan teknis;
1.Raker antara Ditwill.II dan Balai dlm penyiapan bahan usulan program (Pra Konreg & Penajaman program) utk Dana APBN Pusat
(2) Penyusunan rencana dan inventarisasi pengadaan tanah jalan nasional; (3) Penyiapan petunjuk pelaksanaan dan sosialisasi pengadaan tanah;
(7) Pemantauan pelaksanaan pengadaan tanah jalan nasional;
2.Konsultasi Program dan Penyiapan data /index Teknis untuk DAK, serta Monitoring hasil kegiatan/laporan pelaksanaan DAK di 12 Prov 3.Pembinaan teknik berupa sosialisasi NSPK untuk Jalan daerah;
TER-PROGRAM TAHUN
• Tahun 2011, 2012 & 2013. • Akan diprogramkan setiap tahun.
• Tahun 2011, 2012 & 2013. • Akan diprogramkan setiap tahun.
OUTPUT • Dokumen Program penanganan Jalan & Jbt dg APBN, utk 1 tahun ke depan; • Dokumen Program DAK (tahunan); • Laporan hasil pelaksanaan DAK di 12 Provinsi. • Data teknis DAK.
• Tahun 2011, 2012 & 2013. • Akan diprogramkan setiap tahun.
1.Sosialisasi pengadaan tanah untuk Pemerintah Daerah, Balai dan Satker P2JN dan satker Fisik;
• Sosialisasi : tahun 2012 & 2013.
2.Inventarisasi kebutuhan lahan jalan Nasional/SNR.
• Inventarisasi keb lahan Lintas Selatan Kalimantan & JJLS Jateng-Jatim : 2012; • Inventarisasi keb lahan Pantura & JJLS JabarBanten: 2013; • Inventarisasi keb lahan JJLS Jabar & Banten: 2013;
3.Pemantauan pelaksanaan pengadaan tanah untuk jalan Nasional.
• Monev pengadaan tanah tahun 2012 – 2013.
• Lap Sosialisasi 2012 utk : Kalbar, Kaltim, Jateng, DIY, Jatim, DKI, Banten & Jabar • Lap Sosialisasi 2013 utk : Kalsel, Kalteng, Jateng, Jatim, Bali, NTB & NTT; • Laporan 2012 : Inventarisasi keb JLS Kalimantan & JJLS Jateng & Jatim; • Laporan 2013 : Inventarisasi keb lahan Pantura, JJLS Jabar & Banten.
• Laporan Monev pengadaan tanah • Monev LARAP RRDP (2012 & 2013);
KAITAN FUNGSI DIREKTORAT WILAYAH DG SUBDIREKTORAT DAN KEGIATAN No
FUNGSI DIREKTORAT WILAYAH
3.
Penyiapan rekomendasi laik fungsi jalan nasional;
SUBDIT SISDAL (11) Pelaksanaan evaluasi tingkat kelaikan jalan nasional.
SUBDIT WILAYAH
KEGIATAN YANG MENDAPAT DUKUNGAN SATKER DITWIL
TER-PROGRAM TAHUN
OUTPUT
1.Penyusunan Pedoman/modul pelaksanaan Uji Laik Fungsi Jalan Nasional;
• Tahun 2011
• Buku Pedoman/Modul
2.Sosialisasi Tata Cara /Pelaksanaan Uji Laik Fungsi jalan Nasional utk Calon Tim ULFJ dari Ditwil II, Balai, Satker, pihak Perhubungan/LLAJ dan Kepolisian/POLRI.
• Tahun 2012
• Laporan Sosialisasi
3. Penyiapan dan Evaluasi Hasil pelaksanaan ULFJ dan penyiapan Sertifikat Laik Fungsi dari Penyelenggara Jalan.
• Tahun 2012 & 2013;
• Sertifikat Laik Fungsi Jalan.
4.Sosialisasi Keselamatan Jalan dan Monitoring hasil pelaksanaan Rekomendasi Tim ULFJ.
• Tahun 2013
(12) Pembinaan penanggulangan darurat dan Pemantauan dan evaluasi Penanganan Bencana Alam;
1.Penyusunan metigasi bencana
• Tahun 2011;
• Laporan
2.Monev penanganan bencana alam
• Tahun 2011 – 2013;
• Laporan
(6) Pembinaan dan bimbingan teknis penyiapan pelaksanaan dan pelaksanaan pekerjaan jalan nasional termasuk jalan bebas hambatan;
1.Pengawasan paket-paket Loan SRIP di Pulau Jawa dan Sumatera;
• Tahun 2008 – 2014;
• Laporan
2.Bantuan Teknik untuk mendukung Pembinaan Pelaksanaan Konstruksi;
• Tahun 2011 – 2012;
• Laporan
3.Monitoring dan Evaluasi Pelaksanaan Konstruksi Jalan Nasional;
• Laporan
(10) Pemantauan dan evaluasi pemanfaatan bahan dan peralatan jalan;
4.Monev LARAP paket Loan RRDP .
• Tahun 20112013 (dan berlanjut setiap tahun); • Tahun 2013
5.Penyusunan Pedoman untuk Pemantauan dan evaluasi pemanfaatan bahan dan peralatan.
• Tahun 2011;
• Buku Pedoman
6.Inventarisasi dan evaluasi bagianbagian jalan di Prov Bali.
• Tahun 2013
• Laporan
(11) Penyiapan penetapan laik fungsi jalan nasional;
• Laporan
4.
5.
Pembinaan penanggulangan darurat dan perbaikan kerusakan jalan akibat Bencana Alam;
Pembinaan pelaksanaan konstruksi dan penggunaan bahan dan peralatan;
(9) Koordinasi pelaksanaan konstruksi jalan yang bersumber dari PHLN;
• Laporan
KAITAN FUNGSI DIREKTORAT WILAYAH DG SUBDIREKTORAT DAN KEGIATAN No
FUNGSI DIREKTORAT WILAYAH
SUBDIT SISDAL
SUBDIT WILAYAH
KEGIATAN YANG MENDAPAT DUKUNGAN SATKER DITWIL
6.
Penilaian usulan program penanganan jalan nasional dari BBPJN/BPJN;
(5) Koordinasi penyiapan bahan usulan (untuk menyusun program jangka menengah dan tahunan penanganan jalan);
(1) Penyiapan bahan usulan untuk menyusun program jangka menengah dan tahunan penanganan jalan; (2) Penilaian usulan program penanganan jalan nasional dari BBPJN/BPJN;
1.Raker antara Ditwill.II dan Balai dlm penyiapan bahan usulan program 1 tahun ke depan (Pra Konreg & Penajaman program);
• Tahun 2011, 2012, 2013
• Dokumen Program penanganan Jalan & Jbt utk 1 tahun ke depan;
7.
Penilaian usulan program penanganan jalan provinsi, kabupaten, kota dan desa yang dibiayai oleh Dana Alokasi Khusus (DAK) dan dana pusat lainnya;
(6) Koordinasi pengusulan program penanganan jalan provinsi, kab, kota dan desa yang dibiayai oleh Dana Alokasi Khusus (DAK) dan dana pusat lainnya;
(3) Penilaian usulan program penanganan jalan provinsi, kabupaten, kota, dan desa yang dibiayai oleh DAK dan dana pusat lainnya;
1. Konsultasi Program dan Penyiapan data /index Teknis untuk DAK, serta Monitoring hasil kegiatan/laporan pelaksanaan DAK di 12 Prov
• Tahun 2011, 2012 & 2013. • Akan diprogramkan setiap tahun.
• Dokumen Program DAK (tahunan); • Laporan hasil pelaksanaan DAK di 12 Provinsi. • Data teknis DAK.
8.
Pembinaan manajemen kontrak termasuk fasilitasi perubahan dokumen anggaran;
(1) Penyiapan rencana pengendalian pembinaan pelaksanaan jalan nasional; (8) Penyusunan Laporan Akuntabilitas Kinerja Ditbinlak Wilayah II;
(8) Fasilitasi penyesuaian kontrak yang merubah target DIPA;
9.
Pelaksanaan bimbingan teknis pelaksanaan jalan nasional termasuk jalan bebas hambatan;
(1) Penyiapan rencana pengendalian pembinaan pelaksanaan jalan nasional; (9) Koordinasi pelaksanaan konstruksi jalan yang bersumber dari PHLN;
(6) Pembinaan dan bimbingan teknis penyiapan pelaksanaan dan pelaksanaan pekerjaan jalan nasional termasuk jalan bebas hambatan; (13) Pemantauan dan penyiapan bahan evaluasi kinerja penyedia jasa; (15) Koordinasi penyelesaian laporan hasil pemeriksaan.
• Tahun 2011 – 2013 dst
• Laporan
• Tahun 2011 – 2013 dst
• Laporan
• Tahun 2011-2013 dst
• Laporan
• Tahun 20112012.
• Pedoman dan Laporan
• Tahun 2011 – 2013 dst.
• Laporan
1.Sosialisasi NSPK dan Bimbingan Teknis untuk Jalan Nasional. 2.Monev pelaksanaan konstruksi jalan & Jembatan (Prakontrak sd Serah Terima). 3.Sampling utk Pengecekan kepatuhan kasatkker/PPK.
4.Pemantauan dan evaluasi utk penyedia Jasa. 5.Koordinasi penyelesaian LHP
TER-PROGRAM TAHUN
OUTPUT
KAITAN FUNGSI DIREKTORAT WILAYAH DG SUBDIREKTORAT DAN KEGIATAN No
FUNGSI DIREKTORAT WILAYAH
10.
Pelaksanaan fasilitasi penyelenggaraan jalan provinsi, kab, kota dan desa termasuk pengaturan, pembinaan, dan pengendalian fungsi dan manfaat jalan;
11.
Pelaksanaan tata usaha Direktorat Bina Pelaksanaan Wilayah II.
SUBDIT SISDAL
SUBDIT WILAYAH
(10) Koordinasi rencana fasilitasi penyelenggaraan jalan provinsi, kab, kota dan desa ;
(4) Fasilitasi penyusunan program jalan provinsi, kabupaten, kota, dan desa; (5) Fasilitasi penyiapan pelaksanaan dan pelaksanaan jalan provinsi, kabupaten, kota, dan desa termasuk bimbingan teknis; (14) Fasilitasi penyusunan leger jalan provinsi, kabupaten, kota, dan desa; (9) Fasilitasi pengendalian pemanfaatan bagianbagian jalan;
KEGIATAN YANG MENDAPAT DUKUNGAN SATKER DITWIL
TER-PROGRAM TAHUN
1.Sosialisasi dan bimbingan teknis untuk peningkatan kinerja jalan daerah. 2.Bimbingan teknis Laik fungsi Jalan, leger jalan dsb.
• Tahun 2011 – 2013 dst.
1.Kegiatan administrasi Satker untuk mendukung kegiatan keTU-an, Pemeliharaan Kantor dan Peralatan Kantor
• Tahun 2011 – seterusnya.
OUTPUT • Laporan
III.9. STRUKTUR ORGANISASI SATUAN KERJA DIREKTORAT BINA PELAKSANAAN WILAYAH II
SATUAN KERJA DIREKTORAT BINA PELAKSANAAN WILAYAH II (DIREKTUR) Ir. Winarno, M.EngSc
PPK SISTEM PENGENDALIAN (KSD SISDAL) Ir. Tasripin Sartiyono, MT
PPK PEMBINAAN WILAYAH (KSD WILAYAH) Ir. Zamharir Basuni, M.MT
PEJABAT YANG MELAKUKAN PENGUJIAN & PERINTAH PEMBAYARAN Sudirman, ST
BENDAHARA PENGELUARAN Suyatno, S.Sos, M.Si
PETUGAS VERIF UAKPA Dwi Wuryanti, ST
ASISTEN UMUM, Edwi Kusumawati,ST.MT
ASISTEN UMUM, Yulia Ramadhani,ST,MT
PETUGAS ADM SPP Maladi
PETUGAS PEMBUKUAN Suyatno, S.Sos, M.Si
ASISTEN KEUANGAN Ratno Adi Setiawan, ST,MT
ASISTEN KEUANGAN Lampita Kristani,SE,M.Si
PETUGAS VERIFIKASI SPP Endang Purwati, BA
PETUGAS SPP/SPJ/UP Martina Piranti,S.Sos
ASISTEN TEKNIK
ASISTEN TEKNIK
Yuanita Kiki Sani, ST,M.Eng.M.Sc
Aditya Viko Vignata,ST
PETUG. PENERBIT PENY.SPM Bondan Dwi Utomo,SE
PETUGAS VERIFIKASI Bondan Dwi Utomo,SE
PELAKSANA SWAKELOLA & PO KONTRAKTUAL Pkt.1. Sudirman, ST Pkt.2. Ir. Dwi Sapto Haryanto Pkt.3. Adi Sulistiono,B.Sc,SE Pkt.4. Ir. Bowo Sudiatmanto, MT Pkt.5. Ir. Bambang Suryono,M.Sc Pkt.9. Yuanita Kiki S.ST,M.EngMSc Pkt.10.Ir.Yudiarmand Z.K.M.EngSc Pkt.11.Ratno Adi Setiawan,ST,MT Pkt.12.Ir.Engkan Lengkana Ranu Pkt.13.Muh.Rendisyah Afni,ST Pkt.14.Ir.Yudiarmand Z.K.M.EngSc Pkt.15.Ir.Muftoni
PELAKSANA SWAKELOLA & PO KONTRAKTUAL Pkt.6. Ir.Birviq Ady Sanjaya,M.MT Pkt.7. R.M.Bambang Nugroho Pkt.8. Ir. Hari Setiawan Pkt.16.Yulia Ramadhani,ST.MT Pkt.17.Hoctri Efendi Hutagalung,ST Pkt.18.Eko Indrawati,ST Pkt.19.Ir.Dwi Sapto Haryanto Pkt.20.Herman W.,S.Kom,SH.MT Pkt.21.Ir.R.M.Bamabang Nugroho Pkt.22.Ir.Muftoni Pkt.23.Ir.Faizal,M.Si
PETUGAS ADM UAKPA Dwi Wuryanti, ST
PETUGAS ADM UAKPB Ignatius Indra Gema D.SIP PETUGAS VERIF UAKPB Ignatius Indra Gema D.SIP
KRITERIA PEMBAGIAN TUGAS DAN KEGIATAN UNTUK KASATKER DAN PPK PADA SATUAN KERJA DIREKTORAT BINA PELAKSANAAN WILAYAH II
I.
KEGIATAN SATKER *): a) Administrasi kegiatan Satuan Kerja; b) Pembayaran Gaji Upah, tunjangan dan honor panitia pengadaan; c) Pengadaan Barang, pemeliharaan kantor dan peralatan kantor.
II. KEGIATAN PPK PEMBINAAN SISTEM PENGENDALIAN a) Kegiatan yang mendukung Tugas dan Fungsi (TUSI) Ditbinlak Wilayah II dan Tusi Subdit Sistem Pengendalian serta Ke-TU-an; b) Kegiatan lain yang perlu koordinasi antara Subdit Sistem Pengendalian dan Subdit Wilayah IIA, IIB, IIC dan IID dalam mendukung Tusi Direktorat Bina Pelaksanaan Wilayah II.
III. KEGIATAN PPK PEMBINAAN WILAYAH a) Kegiatan yang mendukung tugas dan fungsi Ditbinlak Wilayah II dan Tusi Subdit Wilayah IIA, IIB, IIC dan IID.
Keterangan : *) Kegiatan Kasatker dikuasakan kepada PPK Pembinaan Sistem Pengendalian.
III.10. KEGIATAN SATKER DIREKTORAT BINA PELAKSANAAN WILAYAH II - T.A. 2013
Satker Direktorat Bina Pelaksanaan Wilayah II, pada TA 2013 dengan Alokasi Anggaran sebesar Rp. 51.525.902.000,- dan melaksanakan beberapa paket-paket konsultans dan swakelola, terdiri dari dua PPK pada Satker Direktorat Bina Pelaksanaan Wilayah II antara lain :
III.10.1. PPK Pembinaan Sistem Pengendalian Wilayah II Pada Tahun Anggaran 2013 PPK Pembinaan Sistem Pengendalian Wilayah II melakukan kegiatan dengan alokasi anggaran sebesar Rp. 33.195.003.000,- (tiga puluh tiga milyar seratus sembilan puluh lima juta tiga ribu rupiah) dan melaksanakan beberapa kegiatan paket - paket kontrak dan swakelola adapun paket-paket tersebut terdapat pada halaman berikutnya termasuk alokasi dana tahun 2012 dan 2011.
III.10.2. PPK Pembinaan Wilayah II Pada Tahun Anggaran 2013 PPK Pembinaan Wilayah II melakukan Alokasi Anggaran sebesar Rp.18.330.899.000,- (delapan belas milyar tiga ratus tiga puluh juta delapan ratus sembilan puluh sembilan ribu rupiah) dan melaksanakan beberapa kegiatan paket - paket kontrak dan swakelola adapun paket-paket tersebut terdapat pada halaman berikutnya termasuk alokasi dana tahun 2012 dan 2011.
TABEL III.4. KEGIATAN SATKER DIREKTORAT BINA PELAKSANAAN WILAYAH II - T.A 2013
Unit Eselon II : Direktorat Bina Pelaksanaan Wilayah II Unit Eselon III : SATKER INDUK
No
l.
Nama Kegiatan
Sumber Dana
Anggaran Biaya RPM
Jenis Pekerjaan Total
PLN
S
K
Layanan Perkantoran KEGIATAN :
1
Administrasi Kegiatan
APBN
1.236.000
1.236.000
2
Pembayaran Gaji dan Tunjangan
APBN
826.574
826.574
3
Penyelenggaraan Operasional dan Pemeliharaan Kantor
APBN
2.229.349
2.229.349
4
Sistem Pelaporan Elektronik
APBN
22.750
22.750
5
Biaya Lelang
APBN
135.730
135.730
6
Honor Output Kegiatan Panitia Pengadaan dan Penerima Hasil Pekerjaan
APBN
13.325
13.325
7
Perangkat Pengolah Data dan Komunikasi
APBN
290.320
290.320
8
Peralatan dan Fasilitas Perkantoran
APBN
97.900
97.900
√
9
Gedung/Bangunan
APBN
191.250
191.250
√
5.043.198
2
SUB TOTAL - 1 (SATKER INDUK)
5.043.198
-
√
1
Unit Eselon II : Direktorat Bina Pelaksanaan Wilayah II Unit Eselon III : Subdt Sistem Pengendalian Wilayah II (PPK PEMBINAAN SISTEM PENGENDALIAN)
Anggaran Biaya No
RPM 1
2
3
Total
S
K
a. Evaluasi Pelaksanaan Jalan Nasional di lingkungan Ditbinlak Wilayah II
3.000.000
3.000.000
√
b. Penyiapan Data Informasi dan evaluasi Jalur Lebaran di Ditbinlak Wilayah II
1.200.000
1.200.000
√
c . Monitoring dan Evaluasi Pelaksanaan Quick Wins Pantura Jawa
1.008.838
1.008.838
a. Inventarisasi Kebutuhan lahan Jalan Nasional/SNR di Pantai Selatan Jawa Barat dan Banten
1.100.000
1.100.000
√
b. Inventarisasi Kebutuhan lahan Jalan Nasional di Lintas Pantura
1.200.000
1.200.000
√
800.000
800.000
√
700.000
700.000
√
2.000.000
2.000.000
√
b. Pembuatan sistem pengendalian usulan program tahunan dan
372.000
372.000
√
c. Pembuatan program e-office
228.000
228.000
√
√
Penyusunan rencana dan inventarisasi pengadaan tanah jalan nasional
Penyiapan petunjuk pelaksanaan dan sosialisasi pengadaan tanah
Pelaksanaan fungsi unit penjamin mutu Direktorat Bina Pelaksanaan Wilayah II a. Penerapan Sistem Manajemen Mutu di Ditbinlak Wilayah II
5
PLN
Penyiapan rencana pengendalian pembinaan pelaksanaan jalan nasional
a. Sosialisasi Pengadaan Tanah 4
Jenis Pekerjaan
TUSI DAN KEGIATAN
Koordinasi penyiapan bahan usulan untuk menyusun program jangka menengah dan tahunan penanganan jalan a. Pembinaan dan Penilaian Bahan Usulan Program 5 tahunan dan tahunan
Unit Eselon II : Direktorat Bina Pelaksanaan Wilayah II Unit Eselon III : Subdt Sistem Pengendalian Wilayah II (PPK PEMBINAAN SISTEM PENGENDALIAN) Anggaran Biaya No
RPM
6
7
8
Total
S
a. Monev penanganan jalan yang dibiayai DAK di Subdit Sisdal Wilayah II
453.476
453.476
√
Koordinasi penyusunan rencana kegiatan Direktorat Bina Pelaksanaan Wilayah II a. Monev Pelaks Prakontrak, Pelaksanaan Kontrak dan Serah terima pekerjaan utk jalan Nasional dan Bebas Hambatan Subdit Pengendalian Penyusunan Laporan Akuntabilitas Kinerja Direktorat Bina Pelaksanaan Wilayah II
455.464
455.464
√
2.000.000
2.000.000
√
K
Koordinasi pelaksanaan konstruksi jalan yang bersumber dari Pinjaman dan Hibah Luar Negeri a. Paket SRIP (CSC-1)/Pengawasan
10.734.027
10.734.027
√
b. Paket SRIP (CSC-2)/Pengawasan
1.000.000
1.000.000
√
900.000
900.000
√
1.000.000
1.000.000
√
28.151.805
10
c. Monev Pelaksanaan LARAP Paket-paket RRDP (lanjutan) 10
PLN
Koordinasi pengusulan program penanganan jalan provinsi, kabupaten, kota, dan desa yang dibiayai oleh Dana Alokasi Khusus dan dana pusat lainnya
a. Sinkronisasi dan konsolidasi Laporan Hasil Kinerja 9
Jenis Pekerjaan
TUSI DAN KEGIATAN
Penyiapan rencana fasilitasi penyelenggaraan jalan provinsi, kabupaten, kota, dan desa a. Sosialisasi dan Diseminasi Pedoman-Pedoman tentang Jalan Daerah
11
Pelasanaan evaluasi tingkat kelaikan jalan nasional a. Sosialisasi Keselamatan jalan dan monitoring rekomendasi laik fungsi jalan Nasional SUB TOTAL - 2 ( PPK PEMBINAAN SISDAL)
16.417.778
11.734.027
7
Unit Eselon II : Direktorat Bina Pelaksanaan Wilayah II Unit Eselon III : Sub Direktorat Wilayah II (PPK PEMBINAAN WILAYAH) No
1
TUSI DAN KEGIATAN
Sumber Dana
Anggaran Biaya
Jenis Pekerjaan Keterangan
RPM
PLN
Total
S
Penyiapan bahan usulan untuk m enyusun program jangka m enengah dan tahunan penanganan jalan a. Pembinaan dan Penilaian Bahan Usulan Program Tahunan dan lima Tahunan
2
Koord Sisdal
Penilaian usulan program penanganan jalan nasional dari balai besar pelaksanaan jalan nasional a. Pembinaan dan Penilaian Bahan Usulan Program Tahunan dan lima Tahunan
3
Penilaian usulan program penanganan jalan provinsi, kabupaten, kota dan desa yang dibiayai oleh Dana Alokasi Khusus dan dana pusat lainnya
4
Fasilitasi penyusunan program jalan provinsi, kabupaten, kota, dan desa
5
Fasilitasi penyiapan pelaksanaan dan pelaksanaan jalan provinsi, kabupaten, kota, dan desa term asuk bim bingan teknis
Koord Sisdal
a. Penilaian/Konsultasi Program Penanganan DAK
6
K
Koord Sisdal
b. Bimbingan Teknis Pedoman-pedoman tentang Jalan Daerah daan DAK
APBN
2.000.000
2.000.000
√
c. Bimbingan Teknis Uji Laik Fungsi Jalan Provinsi/Kabupaten/Kota
APBN
2.000.000
2.000.000
√
d. Monev Penanganan Jalan yang diayai DAK di Wilayah IIA
APBN
226.714
226.714
√
e. Monev Penanganan Jalan yang diayai DAK di Wilayah IIB
APBN
249.158
249.158
√
f. Monev Penanganan Jalan yang diayai DAK di Wilayah IIC
APBN
249.158
249.158
√
g. Monev Penanganan Jalan yang diayai DAK di Wilayah IID
APBN
260.799
260.799
√
APBN
507.428
507.428
√
APBN
555.237
555.237
√
APBN
632.970
632.970
√
APBN
699.790
699.790
√
f. Manajemen Pengendalian Kepatuhan
APBN
1.800.000
1.800.000
√
g. Sosialisasi dan Diseminasi Pedoman-pedoman Jalan Nasional
APBN
2.500.000
2.500.000
√
Pem binaan dan bim bingan teknis penyiapan pelaksanaan dan pelaksanaan pekerjaan jalan nasional term asuk jalan bebas ham batan a. Monev Pelaks Pra Kontrak, Pelaks Kontrak dan Serah Terima Pek untuk Jalan Nasional dan Bebas Hambatan Wilayah IIA b. Monev Pelaks Pra Kontrak, Pelaks Kontrak dan Serah Terima Pek untuk Jalan Nasional dan Bebas Hambatan Wilayah IIB c. Monev Pelaks Pra Kontrak, Pelaks Kontrak dan Serah Terima Pek untuk Jalan Nasional dan Bebas Hambatan Wilayah IIC e. Monev Pelaks Pra Kontrak, Pelaks Kontrak dan Serah Terima Pek untuk Jalan Nasional dan Bebas Hambatan Wilayah IID
Unit Eselon II : Direktorat Bina Pelaksanaan Wilayah II Unit Eselon III : Sub Direktorat Wilayah II (PPK PEMBINAAN WILAYAH) No
7
TUSI DAN KEGIATAN
Anggaran Biaya
Jenis Pekerjaan Keterangan
RPM
PLN
Total
S
K
Pe m antauan pe lak s anaan pe ngadaan tanah jalan nas ional a Monitoring dan Evaluasi Pelaksanaan Pembebasan Tanah
8
Sumber Dana
APBN
335.092
335.092
√
Fas ilitas i pe nye s uaian k ontrak yang m e rubah targe t DIPA Termasuk kegiatan Tusi 6
a. Monev Pelaksanaan 9
Fas ilitas i pe nge ndalian pe m anfaatan bagian-bagian jalan a. Inventarisasi dan evaluasi bagian-bagian jalan di Prov Bali
10
APBN
1.100.000
√
1.100.000
Pe m antauan dan e valuas i pe m anfaatan bahan dan pe ralatan jalan Termasuk kegiatan Tusi 6
a. Monev TUSI: 11
Pe nyiapan pe ne tapan laik fungs i jalan nas ional a. Penyiapan Tim uji laik f ungsi jalan
12
Pe m antauan dan e valuas i Pe nananganan Be ncana Alam a. Pelaksanaan Penanggulangan Bencana Alam b. Monitoring dan Evaluasi Penanganan Daerah Raw an Bencana Jalan Nasional di Kalimantan Timur c. Monitoring dan Evaluasi Penanganan Daerah Raw an Bencana Jalan Nasional di Pulau Jaw a
13
Keg Rutin
√
APBN
344.501
344.501
APBN
1.500.000
1.500.000
√
APBN
1.200.000
1.200.000
√
Pe m antauan dan Pe nyiapan bahan e valuas i k ine rja pe nye dia jas a Termasuk kegiatan Tusi 6
a. Monev 14
Fas ilitas i pe nyus unan le ge r jalan provins i, k abupate n, k ota, dan de s a a. Bimbingan Teknis Penyusunan Leger Jalan Provinsi, Kabupaten, Kota dan Desa
15
APBN
2.000.000
2.000.000
√
APBN
250.000
250.000
√
Koordinas i pe nye le s aian laporan has il pe m e rik s aan a. Koordinasi Penyelesaian Hasil Pemeriksaan (LHP) SUB TOTAL - 3 (PPK PEMBINAAN WILAYAH) SUB TOTAL - 1 (SATKER INDUK)
18.410.847
-
18.410.847
16
3
5.043.198
-
5.043.198
2
1
SUB TOTAL-2 (PPK PEMBINAAN SISDAL)
16.417.778
11.734.027
28.151.805
10
7
SUB TOTAL - 3 (PPK PEMBINAAN WILAYAH)
18.410.847
-
18.410.847
16
3
39.871.823
11.734.027
51.605.850
28
11
TOTAL SATKER
III.11. Barang Milik Negara (BMN) Sebagai pelaksanaan dari ketentuan Pasal 48 ayat (2) dan Pasal 49 ayat (6) Undang Undang Nomor 1 Tahun 2004 tentang Perbendaharaan Negara dan untuk menjamin terlaksananya tertib administrasi dan tertib pengelolaan BMN/D, telah diterbitkan Peraturan Pemerintah (PP) Nomor 6 Tahun 2006 tentang Pengelolaan BMN/D. Ruang lingkup pengelolaan BMN/D dalam PP Nomor 6 Tahun 2006 adalah meliputi semua aktivitas yang berkaitan dengan BMN/D terdiri dari perencanaan kebutuhan dan penganggaran, pengadaan, penggunaan, pemanfaatan (meliputi sewa, pinjam pakai, kerjasama pemanfaatan, dan bangun guna serah/bangun serah guna), pengamanan (meliputi administrasi, fisik dan hukum) dan pemeliharaan, penilaian, penghapusan, pemindahtanganan (meliputi penjualan, tukar menukar, hibah, dan PMP), penatausahaan (meliputi pembukuan, inventarisasi, dan pelaporan), pembinaan, pengawasan dan pengendalian. II.11.1. BMN SATUAN KERJA DIREKTORAT BINA PELAKSANAAN WILAYAH II a. Total BMN Intrakomptable yang yang dikelola Satuan Kerja Direktorat Bina Pelaksanaan Wilayah II per Semester I tahun 2013 senilai Rp. 7.997.612.555,00 dengan rincian sebagai berikut : Akun Neraca Peralatan dan Mesin Aset Tetap Dalam Renovasi Aset Tetap Lainnya
Saldo Awal
Mutasi Tambah
Mutasi Kurang
Saldo
7.022.047.895
821.264.000
177.070.000
7.666.241.895
322.880.460
0
0
322.880.460
8.490.200
0
0
8.490.200
b. Total BMN Ekstrakomptable yang yang dikelola Satuan Kerja Direktorat Bina Pelaksanaan Wilayah II per Semester I tahun 2013 senilai Rp. 127.403.055,00 dengan rincian sebagai berikut : Akun Neraca
Saldo awal
Mutasi Tambah
Mutasi Kurang
Saldo
Peralatan dan Mesin
36.384.055
1.500.000
1.500.000
36.384.055
Gedung dan Bangunan
91.019.000
0
0
91.019.000
III.11.2. REKAPITULASI CATATAN RINGKAS BARANG MILIK NEGARA UNTUK BARANG DIREKTORAT BINA PELAKSANAAN WILAYAH II III.12.1. INTRAKOMPTABEL Akun Neraca
Mutasi +
Saldo
No.
Kode
Mutasi -
1
132111
Peralatan dan Mesin
821.264.000
177.070.000
7.666.241.895
1.a
132111
Alat Angkutan Darat Bermotor (3.02.01)
688.185.000
152.320.000
2.916.444.000
1.b
132111
Alat Ukur (3.03.03)
0
0
40.700.000
1.c
132111
Alat Kantor (3.05.01)
2.250.000
2.250.000
766.658.350
1.d
132111
Alat Rumah Tangga (3.05.02)
12.500.000
12.500.000
1.085.723.860
1.e
132111
Alat Studio (3.06.01)
4.379.000
0
487.390.000
1.f
132111
Alat Komunikasi (3.06.02)
0
0
92.100.500
1.g
132111
Unit Alat Laboratorium (3.08.01)
0
0
29.893.000
1.h
132111
Komputer Unit (3.10.01)
110.950.000
10.000.000
1.800.403.159
1.i
132111
Peralatan Komputer (3.10.02)
3.000.000
0
450.599.026
2
135111
Gedung dan Bangunan Dalam Renovasi (6.07.03)
0
0
322.880.460
3
135121
Bahan Perpustakaan Tercetak (6.01.01)
0
0
8.490.200
4
136111
Jalan, Irigasi dan Jembatan (7.01.01)
41.264.164.642
32.966.084.685
5
162171
Hasil Kajian Penelitian
0
0
9.546.741.600
6
162191
Aset Tak Berwujud Lainnya
41.880.735.572
1.765.110.430
70.536.868.856
7
117111
Persediaan/Barang Konsumsi
0
0
28.519.300
0
30-Jun-13
III.11.3. REKAPITULASI CATATAN RINGKAS BARANG MILIK NEGARA
III.11.3. INTRAKOMPTABEL No.
Kode
Akun Neraca
Mutasi +
Saldo
Mutasi -
30-Jun-13 1.a
131211
Alat Kantor (3.05.01)
0
0
5.963.700
1.b
131211
Alat Rumah Tangga (3.05.02)
1.500.000
1.500.000
21.260.640
1.c
131211
Alat Studio (3.06.01)
0
0
3.670.000
1.d
131211
Alat Komunikasi (3.06.02)
0
0
80.000
1.e
131211
Alat Laboratorium (3.08.01)
0
0
2.295.000
1.f
131211
Peralatan Komputer (3.10.02)
0
0
3.114.715
1.g
133111
Bangunan Gedung Tempat Tinggal (4.01.02)
0
0
91.019.000
IV. STRUKTUR ORGANISASI BALAI IV.1. Struktur Organisasi Balai Besar Pelaksanaan Jalan Nasional IV KEPALA BALAI BESAR PELAKSANAAN JALAN NASIONAL IV Ir. BAMBANG HARTADI, MPM NIP. : 19570222 198602 1 001 GOL. IV/b, 01-04-2012 Bandung, 22-02-1957 01/KPTS/M/2013, 02-01-2013 TMT. 11-01-2013, Islam. KEPALA BAGIAN TATA USAHA Ir. PADI SUSETYO, MCM NIP. : 19570419 198603 1 001 GOL.: III/A, 01-04-2007
Islam.
KEPALA SUB BAGIAN KEPEGAWAIAN HJ. RULIA KUSWIDATI, ST, MM NIP. : 19691223 199703 2 003 GOL.: III/d, 01-04-2007 Solo, 23-12-1969 236/KPTS/M/2011, 18-08-2011 TMT. 10-10-2011, Islam.
KEPALA SUB BAGIAN KEUANGAN DAN UMUM DJADJAT DJATNIKA, SE NIP. : 19751223 200701 1 003 GOL.: III/b, 01-04-2012 Bandung, 23-12-1975 63.1/KPTS/M/2013, 15-02-2013 TMT. 11-03-2013, Islam.
KEPALA SUB BAGIAN PENGELOLAAN BARANG MILIK NEGARA Ir. MEI LIANA, M.Si NIP. : 19660502 199603 2 001 GOL.: III/d, 01-04-2009 Jakarta, 02-05-1966 02/KPTS/Db/2011, 21-01-2011 TMT. 24-01-2011, Islam.
KEPALA BIDANG PERENCANAAN DR. Ir. DIDIK RUDJITO, M.Sc NIP. : 19630830 199303 1 002 GOL.: IV/a, 01-10-2009 Surabaya, 30-08-1963 07/KPTS/M/2011, 14-01-2011 TMT. 19-01-2011, Islam.
KEPALA BIDANG PELAKSANAAN I Ir. YUDO MUKTIARTO, M.Eng.Sc NIP. : 19600219 198903 1 002 GOL.: IV/a, 01-04-2005 Bandung, 19-02-1960 57/KPTS/M/2012, 19-03-2012 TMT. 22-03-2012, Islam.
KEPALA BIDANG PELAKSANAAN II DR. Ir. TRIONO JUNOASMONO, MT NIP. : 19710604 199904 1 006 GOL.: IV/a, 01-10-2012 Jakarta, 04-06-1971 07/KPTS/M/2011, 14-01-2011 TMT. 19-01-2011, Islam.
KEPALA BIDANG PENGENDALIAN SISTEM PELAKSANAAN, Ir. SUBAIHA KIPLI, MT NIP. : 19661002 199103 2 002 GOL.: IV/a, 01-04-2008 Sungai Liat Bangka, 02-10-1966 07/KPTS/M/2011, 14-01-2011 TMT. 19-01-2011, Islam.
KEPALA SEKSI PROGRAM DAN DATA MADIA GUNAWAN, ST, MM. NIP. : 19760311 200003 1 001 GOL.: III/c, 01-04-2010 Semarang, 11-3-1978 02/KPTS/Db/2011, 21-01-2011 TMT. 24-01-2011, Islam.
KEPALA SEKSI PENINGKATAN KAPASITAS I BENNY YANTO, ST NIP. : 19580614 198903 1 002 GOL.: III/d, 01-04-2012 Padang, 14-06-1958 304/KPTS/M/2012, 24-09-2012 TMT. 12-10-2012, Islam.
KEPALA SEKSI PENINGKATAN KAPASITAS II TRI BUDAYANTI, ST NIP. : 19621107 198803 2 002 GOL.: III/c, 01-04-2011 Bandung, 07-11-1962 304/KPTS/M/2012, 24-09-2012 TMT. 12-10-2012, Islam.
KEPALA SEKSI PENGENDALIAN SISTEM PELAKSANAAN MARUNTUNG STAALIANTO, ST, MUM NIP. : 19671212 199603 1 001 GOL.: IV/a, 01-04-2012 Banda Aceh,12-12-1967 02/KPTS/Db/2011, 21-01-2011 TMT. 24-01-2011, Kristen.
KEPALA SEKSI PRESERVASI I Ir. BUDI WALUYO NIP. : 19621211 199502 1 001 GOL.: III/d, 01-04-2007 Sidoarjo, 11-12-1962 02/KPTS/Db/2011, 21-01-2011 TMT. 24-01-2011, Islam.
KEPALA SEKSI PRESERVASI II FATURROKHMAN, S.ST NIP. : 19630613 198903 1 003 GOL.: III/c, 01-10-2010 Banyumas, 13-06-1963 304/KPTS/M/2012, 24-09-2012 TMT. 12-10-2012, Islam.
KEPALA SEKSI PENGUJIAN DAN PERALATAN Ir. ROBY ABIPRAMONO, MT NIP. :19660608 199903 1 001 GOL.: III/d, 01-04-2009 Bandung, 08-06-1966 397/KPTS/M/2011, 12-12-2011 TMT. 20-12-2011, Islam
KEPALA SEKSI PERENCANAAN TEKNIS DAN LINGKUNGAN BAMBANG FITRIYANTO ST, MT NIP. : 19691221 199003 1 001 GOL.: III/d, 01-04-2009 Pekalongan, 21-12-1969 63.1/KPTS/M/2013, 15-02-2013 TMT. 11-03-2013, Islam.
IV.2. Struktur Organisasi Balai Besar Pelaksanaan Jalan Nasional V KEPALA BALAI BESAR PELAKSANAAN JALAN NASIONAL V DR. Ir. MASRIANTO, MT NIP. : 19590716 198503 1 003 GOL.: IV/c, 01-04-2012 Semarang, 16-07-1959 01/KPTS/M/2013, 02-01-2013 TMT. 11-01-2013, Islam. KEPALA BAGIAN TATA USAHA Ir. TRI INDIANTO, M.Sc NIP. : 19590528 198603 1 008 GOL.: IV/a, 01-10-2002 Sukabumi, 28-05-1959 03/KPTS/M/2013, 09-01-2013 TMT. 11-01-2013, Islam.
KEPALA SUB BAGIAN KEPEGAWAIAN WAHYU WIDODO, SH, MM NIP.: 19641101 198801 1 001 GOL.: III/c, 01-04-2010 Banyuwangi, 01-11-1964 02/KPTS/Db/2011, 21-01-2011 TMT. 24-01-2011, Islam.
KEPALA BIDANG PERENCANAAN Ir. CHRISTIAN KORNEL M.T.S,M.Eng.Sc
NIP. : 19580701 198303 1 001 GOL.: IV/a, 01-04-2009 Situngkir II (Tapanuli Utara), 01-07-1958 07/KPTS/M/2011, 14-01-2011 TMT. 19-01-2011, Kristen.
KEPALA SEKSI PROGRAM DAN DATA ROESLANTO, ST NIP. : 19571113 199204 1 001 GOL.: III/d, 01-10-2008 Solo, 13-11-1957 304/KPTS/M/2012, 24-09-2012 TMT. 12-10-2012, Islam. KEPALA SEKSI PERENCANAAN TEKNIS DAN LINGKUNGAN Ir. YUDHI WIDARGO, M.Eng.Sc NIP. : 19620825 199703 1 003 GOL.: III/d, 01-04-2009 Nganjuk, 25-08-1962 02/KPTS/Db/2011, 21-01-2011 TMT. 24-01-2011, Islam
KEPALA BIDANG PELAKSANAAN I Ir. HERMAN SUROYO, MT NIP. : 19630714 199203 1 010 GOL.: IV/a, 01-04-2008 Jakarta, 14-07-1963 03/KPTS/M/2013, 09-01-2013 TMT. 11-01-2013, Islam.
KEPALA SEKSI PENINGKATAN KAPASITAS I Ir. H. KHAIRUL TAMAMI, MT NIP. : 19641126 198903 1 001 GOL.: IV/a, 01-04-2011 TJ. Karang, 26-11-1964 02/KPTS/Db/2011, 21-01-2011 TMT. 24-01-2011, Islam. KEPALA SEKSI PRESERVASI I Ir. M. ALI ARIFIN, M.Si NIP. : 19620411 199003 1 006 GOL.: IV/a, 01-04-2005 Surabaya, 11-04-1962 304/KPTS/M/2012, 24-09-2012 TMT. 12-10-2012, Islam.
KEPALA SUB BAGIAN KEUANGAN DAN UMUM SUNARYO, SE, MM NIP.: 19620512 199002 1 001 GOL.: III/b, 01-04-2010 Sidoarjo, 12-05-1962 397/KPTS/M/2011, 12-12-2011 TMT. 20-12-2011, Islam
KEPALA BIDANG PELAKSANAAN II Ir. HARI SUKO SETIONO, M.Eng.Sc NIP. : 19630515 199312 1 001 GOL.: IV/a, 01-04-2010 Blitar, 16-05-1963 03/KPTS/M/2013, 09-01-2013 TMT. 11-01-2013, Islam.
KEPALA SEKSI PENINGKATAN KAPASITAS II Ir. NANANG HANDONO P, MT NIP. : 19620804 198310 1 001 GOL.: III/d, 01-04-2010 Mojokerto,- 04/08/1962 02/KPTS/Db/2011, 21-01-2011 TMT. 24-01-2011, Islam. KEPALA SEKSI PRESERVASI II PURNYOTO, ST NIP. : 19650620 199403 1 014 GOL.: III/b, 01-10-2010 Jember, 20-06-1965 63.1/KPTS/M/2013, 15-02-2013 TMT. 11-03-2013, Islam.
KEPALA SUB BAGIAN PENGELOLAAN BARANG MILIK NEGARA HARIANI, S.ST, MT NIP.: 19741108 199903 2 006 GOL.: III/c, 01-10-2011 Madining, 08-11-1974 397/KPTS/M/2011, 12-12-2011 TMT. 20-12-2011, Islam
KEPALA BIDANG PENGENDALIAN SISTEM PELAKSANAAN, Ir. I KETUT DARMAWAHANA, M.MT NIP. : 19590729 198903 1 002 GOL.: IV/a, 01-04-2005 Tabanan, 29-07-1959 07/KPTS/M/2011, 14-01-2011 TMT. 19-01-2011, Hindu Dharma.
KEPALA SEKSI PENGENDALIAN SISTEM PELAKSANAAN Ir. RIDOLF ADAM, M.Sc NIP. : 19620216 198907 1 001 GOL.: IV/b, 01-04-2009 Waingapu, 16-02-1962 397/KPTS/M/2011, 12-12-2011 TMT. 20-12-2011, Kristen KEPALA SEKSI PENGUJIAN DAN PERALATAN ALIEF AKBARI NIP. : 19681110 199003 1 007 GOL.: III/d, , 10-11-1968 63.1/KPTS/M/2013, 15-02-2013 TMT. 11-03-2013, Islam.
IV.3. Struktur Organisasi Balai Besar Pelaksanaan Jalan Nasional VII KEPALA BALAI BESAR PELAKSANAAN JALAN NASIONAL VII Ir. ADRIANANDA, M.Eng.Sc NIP. : 19570205 198303 1 004 GOL.: IV/c, 01-10-2012 Medan, 05-02-1957 178/KPTS/M/2012, 16-07-2012 TMT. 20-07-2012, Islam. KEPALA BAGIAN TATA USAHA Ir. Racman Tarigan. MM NIP.: 19570227 198602 1 001 GOL.: IV/a, Bangun Purba, 27 -02-1957 Kristen
KEPALA SUB BAGIAN KEPEGAWAIAN Ir. SYAHRANSYAH NIP.: 19610102 199903 1 001 GOL.: III/c, 01-04-2010 Banjarmasin, 02-01-1961 02/KPTS/Db/2011, 21-01-2011 TMT. 24-01-2011, Islam.
KEPALA BIDANG PERENCANAAN Ir. Yanhar, CES NIP. : 19570222 198603 1 001 GOL.: IV/a Rantau Prapat, 22-02-1957
KEPALA SUB BAGIAN PENGELOLAAN BARANG MILIK NEGARA Ir. BUDIARTO PURWONUGROHO NIP. : 19611209 199303 1 009 GOL.: III/d, 01-04-2010 Banjarmasin, 09-12-1961 02/KPTS/Db/2011, 21-01-2011 TMT. 24-01-2011, Islam
Islam.
KEPALA BIDANG PELAKSANAAN I Ir. ERVAN EFFENDIE, MT NIP. : 19591121 198603 1 007 GOL.: IV/a, 01-04-2001 Palembang, 21-11-1959 07/KPTS/M/2011, 14-01-2011 TMT. 19-01-2011, Islam.
KEPALA SEKSI PROGRAM DAN DATA Ir. IFANSYAH SUPRIADI, MT NIP. : 19640505 199803 1 005 GOL.: III/c, 01-04-2010, Banjarmasin, 05-05-1964 02/KPTS/Db/2011, 21-01-2011 TMT. 24-01-2011, Islam.
KEPALA SEKSI PENINGKATAN KAPASITAS I KURNIA HALOMOAN, ST, MT NIP. : 19750713 200501 1 005 GOL.: III/b, 01-04-2009 Palangkaraya, 13-07-1975 304/KPTS/M/2012, 24-09-2012 TMT. 12-10-2012, Islam.
KEPALA SEKSI PENINGKATAN KAPASITAS II Ir. BACHTIAR PANSURI, MAP NIP. : 19590216 198903 1 004 GOL.: IV/a, 01-04-2009 Banjarmasin,16-2-1959 02/KPTS/Db/2011, 21-01-2011 TMT. 24-01-2011,
KEPALA SEKSI PENGENDALIAN SISTEM PELAKSANAAN SAPRIL MASHUD, BE NIP. : 19590406 198910 1 001 GOL.: III/d, 01-04-2012 Pogatan, 06-04-1959 02/KPTS/Db/2011, 21-01-2011 TMT. 24-01-2011, Islam.
KEPALA SEKSI PRESERVASI I Ir. ABDUL LATIEF, MT NIP. : 19580712 198903 1 007 GOL.: IV/a, 01-04-2008 Banjarmasin, 12/07/1958 02/KPTS/Db/2011, 21-01-2011 TMT. 24-01-2011, Islam.
KEPALA SEKSI PRESERVASI II H. SYAHRILLIANSYAH, ST, MT NIP. : 19650426 200312 1 003 GOL.: III/c, 01-04-2012 Banjarmasin, 26-04-1965 02/KPTS/Db/2011, 21-01-2011 TMT. 24-01-2011, Islam.
KEPALA SEKSI PENGUJIAN DAN PERALATAN Amirhan, ST, MT NIP. : 1957505 198011 1 003 GOL.: IV/a Amiuntai, 05-05-1957
KEPALA SEKSI PERENCANAAN TEKNIS DAN LINGKUNGAN DEDDY JUNAIDI, ST NIP. : 19750120 200502 1 001 GOL.: III/b, 01-04-2009 Banjarmasin, 20-01-1975 397/KPTS/M/2011, 12-12-2011 TMT. 20-12-2011, Islam
KEPALA BIDANG PELAKSANAAN II Ir. SELAMAT RASIDI, M.Sc NIP.: 19630613 199203 1 002 GOL.: IV/b, 01-10-2010 Medan, 13-06-1963 57/KPTS/M/2012, 19-03-2012 TMT. 22-03-2012, Kristen.
KEPALA SUB BAGIAN KEUANGAN DAN UMUM SITI SYAMSIAH, SE, M.AP NIP.: 19661115 200604 2 003 GOL.: III/b, 01-04-2010 Kandangan, 15-11-1966 63.1/KPTS/M/2013, 15-02-2013 TMT. 11-03-2013, Islam.
KEPALA BIDANG PENGENDALIAN SISTEM PELAKSANAAN, Ir. AGNI BUDI SATRIO, M.Eng.Sc NIP. : 19620706 198803 1 003 GOL.: IV/a, 01-10-2005 Surabaya, 06-07-1962 07/KPTS/M/2011, 14-01-2011 TMT. 19-01-2011, Islam.
Islam
IV.4. STRUKTUR ORGANISASI BALAI PELAKSANAAN JALAN NASIONAL VIII
KEPALA BALAI PELAKSANAAN JALAN NASIONAL VIII Ir. MIFTACHUL MUNIR, MT NIP.: 19630506 199703 1 001 GOL.: III/d, 01-04-2009 Malang, 06-05-1963 178/KPTS/M/2012, 16-07-2012 TMT. 20-07-2012, Islam. KEPALA SUB BAGIAN TATA USAHA Ir. MUHAMMAD HIDAYAT, MT NIP. : 19651103 199203 1 010 GOL.: IV/a, 01-04-2009 Karumbu-Bima, 03-11-1965 02/KPTS/Db/2011, 21-01-2011 TMT. 24-01-2011, Islam.
KEPALA SEKSI PERENCANAAN TINO SURIADI, ST, MT NIP. : 19580727 198303 1 027 GOL.: IV/a, 01-04-2010 Jakarta, 27-07-1958 02/KPTS/Db/2011, 21-01-2011 TMT. 24-01-2011, Islam.
KEPALA SEKSI PELAKSANAAN NUSAKTI YASA WEDHA, ST, MT NIP. : 19671001 199703 1 003 GOL.: III/d, 01-04-2009 Bengkulu, 01-10-1967 63.1/KPTS/M/2013, 15-02-2013 TMT. 11-03-2013, Hindu.
KEPALA SEKSI PENGENDALIAN SISTEM PELAKSANAAN PENGUJIAN DAN PERALATAN Ir. ALFIAN, MT NIP. : 19631222 199303 1 005 GOL.: IV/a, 01-04-2009 Solok, 22-12-1963 63.1/KPTS/M/2013, 15-02-2013 TMT. 11-03-2013, Islam.
V. POHON ANGGARAN DIREKTORAT BINA PELAKSANAAN WILAYAH II TA.2013
ALOKASI ANGGARAN Rp 16.101.614.337.000,-
BINA PELAKSANAAN WILAYAH II
BALAI BPJN IV (DKI, BANTEN, JABAR)
BALAI BPJN V (JATENG, DIY, JATIM)
BALAI BPJN VIII (BALI, NTB, NTT)
BALAI BPJN VII BANJARMASIN
Rp. 51.525.902.000,-
Rp. 3,782,719,801.000,-
Rp. 3.675.206.182.000,-
Rp. 2.481.798.000.000,-
Rp 6.112,878,163.000,-
PPK I Pembinaan Sistem Pengendalian Rp. 33.195.003.000,PPK II Pembinaan Wilayah II Rp. 18.330.899.000,-
DKI Jakarta
Jawa Tengah
Bali
Rp. 1.713.285,491.000,-
Rp. 2.044.304.999.000,-
Rp . 751.798.000.000,-
Banten Rp. 484.423.304.000,-
Jawa Barat Rp 2.161.011.006.000,-
D.I. Yogyakarta
NTB
Rp 364.308.184.000,-
Rp. 750.000.000.000,
Jawa Timur Rp 1.266.592.999.000,-
Kalbar Rp. 1,564,175,181.000,-
Kalteng Rp. 1.268.621.584.000,-
NTT
Kalsel
Rp . 980.000.000.000,-
Rp. 897.428.068.000,-
Kaltim Rp. 2.382.653.330.000,-
V.1. Pohon Anggaran Balai Besar Pelaksanaan Jalan Nasional IV TA.2013 BALAI BESAR PELAKSANAAN JALAN NASIONAL IV (DKI, BANTEN, JABAR) Rp. 3,782,719.000,-
DKI JAKARTA Rp. 1.137,285,491.000,-
BALAI BESAR PELAKSANAAN JALAN NASIONAL IV Rp. 225.991.549.000,PELAKSANAAN JALAN NASIONAL METROPOLITAN I JKT Rp. 253.392.670.000,PELAKSANAAN JALAN NASIONAL METROPOLITAN II JKT Rp 306.738.765.000,PELAKSANAAN JALAN NASIONAL METROPOLITAN III JKT Rp. 320.168.900.000,PERENCANAAN DAN PENGAWASAN JALAN NASIONAL KOTA METROPOLITAN Rp. 30.993.607.000,PELAKSANAAN JALAN BEBAS HAMBATAN TANJUNG PRIOK Rp. 576.515.848.000,-
BANTEN Rp. 484.423.304.000,-
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BANTEN Rp. 153.510.114.000,-
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BANTEN Rp. 256.447.208.000,-
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI BANTEN Rp. 35.886.682.000,-
SKPD DINAS BINA MARGA DAN TATA RUANG PROV. BANTEN Rp. 38.579.300.000
JAWA BARAT Rp. 2.161.011.006.000,PELAKSANAAN JALAN NASIONAL WILAYAH I PROV. JABAR Rp. 371.824.425.000,PELAKSANAAN JALAN NASIONAL WILAYAH II PROV JABAR Rp 1.019.885.148.000,PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG Rp. 97.378.929.000,PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JABAR Rp. 79.245.108.000,-
UNIT PERALATAN DAN PENGUJIAN CIKAMPEK Rp. 10.242.750.000,-
PELAKSANAAN JBH CISUMDAWU Rp. 491.762.800.000,SKPD DINAS BINA MARGA PROV JAWA BARAT Rp. 90.671.846.000,-
V.2. Pohon Anggaran Balai Besar Pelaksanaan Jalan Nasional V TA.2013
BALAI BESAR PELAKSANAAN JALAN NASIONAL V (JATENG, DIY, JATIM) Rp. 3.675.206.182.000,-
JAWA TENGAH Rp. 2.044.304,999.000,-
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATENG Rp. 601.172.342.000,PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JATENG Rp. 509.030.783.000,PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JATENG Rp. 41.557.166.000,PELAKSANAAN JALAN NASIONAL METROPOLITAN SEMARANG Rp. 315.936.517.000,PELAKSANAAN JALAN BEBAS HAMBATAN SOLO - KERTOSONO Rp. 485.778.989.000,SKPD DINAS BINA MARGA PROV JATENG Rp. 90.829.202.000,-
D.I. YOGYAKARTA Rp. 364.308.184.000,-
PELAKSANAAN JALAN NASIONAL WIL. PROVINSI D.I. YOGYAKARTA Rp. 321.904.042.000,PERENC. & PENGAWASAN JALAN NASIONAL PROV. D. I. YOGYA Rp. 12.960.682.000,SKPD DINAS PU, PERUMAHAN DAN ESDM PROV. DI. YOGYAKARTA Rp. 29.443.460.000,-
JAWA TIMUR Rp . 1.266.592.999.000,BALAI BESAR PELAKSANAAN JALAN NASIONAL V Rp. 165.656.436.000,PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATIM Rp. 217.672.860.000,PELAKSANAAN JALAN NASIONAL WILAYAH II PROV. JATIM Rp. 279.141.589.000,PPELAKSANAAN JALAN NASIONAL METROPOLITAN II SURABAYA Rp. 331.467.453.000,PERANCANAAN DAN PENGAWASAN JALAN NASIONAL PROV. JATIM Rp. 40,314,103.000,PELAKSANAAN JALAN NASIONAL METROPOLITAN I SURABAYA Rp. 142.340.558.000,SKPD DINAS PU BINA MARGA JAWA TIMUR Rp. 90,000.000.000,-
V.3. Pohon Anggaran Balai Besar Pelaksanaan Jalan Nasional VII TA.2013 BALAI BESAR PELAKSANAAN JALAN NASIONAL VII (KALBAR, KALTENG, KALSEL, KALTIM) Rp. 6.112,878,163.000,-
KALIMANTAN BARAT Rp. 1.564,175.181.000,-
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALBAR Rp. 494.824.070.000 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALBAR Rp. 224,122,613.000
KALIMANTAN TENGAH Rp. 1.268.621.584.000,-
KALIMANTAN TIMUR Rp. 2.382.653.330.000
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALTENG
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALTIM
Rp. 326.839.418.000
Rp. 864.125.977.000,-
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALTENG
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALTIM
Rp. 397.455.998.000,PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALBAR Rp. 413.425.994.000,-
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALTENG
PELAKSANAAN JEMBATAN TAYAN Rp. 364.769.417.000,-
Rp. 440.291.841.000,-
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROV. KALBAR Rp. 45,677.186.000,-
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROV. KALTENG Rp. 45.074.761.000,-
SKPD DINAS PU PROV. KALIMANTAN BARAT Rp . 21.355.901.000,-
SKPD DINAS PU PROV. KALIMANTAN TENGAH Rp. 58.959.566.000,-
Rp. 572.526.738.000,-
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALTIM
Rp . 774.919.276.000,PERENC DAN PENGAWASAN JALAN NASIONAL PROV KALTIM
KALIMANTAN SELATAN Rp. 897.428.068.000,-
BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
Rp. 89.566.799.000,PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALSEL Rp. 350.301.918.000,-
PELAKSANAAN JALAN NASIONAL WILAYAH II PROV KALSEL Rp. 376.631.143.000,-
Rp . 89.830.307.000,-
PERENC DAN PENGAWASAN JALAN NASIONAL PROV KALSEL Rp. 51.660.541.000,-
DINAS PEKERJAAN UMUM PROP. KALIMANTAN TIMUR Rp. 81.251.032.000,-
DINAS PEKERJAAN UMUM PROP. KALIMANTAN SELATAN Rp. 29.267.667.000,-
V.4. Pohon Anggaran Balai Pelaksanaan Jalan Nasional VIII TA.2013 BALAI BESAR PELAKSANAAN JALAN NASIONAL VIII (BALI, NTB, NTT) Rp. 2.479,284,289.000,-
BALI Rp. 749,284,289.000,-
NUSA TENGGARA BARAT Rp. 750.000.000.000,-
NUSA TENGGARA TIMUR Rp. 980.000.000.000,-
BALAI PELAKSANAAN JALAN NASIONAL VIII Rp. 100.005.825.000,-
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI NTB Rp. 205.064.375.000,-
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI NTT Rp. 263.674.151.000,-
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BALI Rp. 302.346.561.000,-
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI NTB Rp. 271.772.883.000,-
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI NTT Rp. 317.779.829.000,-
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BALI Rp. 85.952.695.000,-
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTB Rp. 210.008.153.000,-
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTT Rp. 152.419.203.000,-
PELAKSANAAN JALAN NASIONAL METROPOLITAN DENPASAR Rp. 225.350.333.000,-
PERENC. & PENGAWASAN JALAN NASIONAL PROV NUSA TENGGARA BARAT
Rp. 49.472.752.000,-
PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI NTT Rp. 179.072.107.000,-
SKPD DINAS PEKERJAAN UMUM PROVINSI NTB Rp. 13.681.837.000,-
PERENC. & PENGAWASAN JLN NAS PROV NUSA TENGGARA TIMUR Rp 57.967.906.000,-
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI BALI Rp. 26.658.423.000,DINAS PEKERJAAN UMUM PROVINSI BALI Rp. 8.970.452.000,-
DINAS PEKERJAAN UMUM PROP. NUSA TENGGARA TIMUR Rp. 9.086.804.000,-
VI. POHON ANGGARAN DIREKTORAT BINA PELAKSANAAN WILAYAH II TA.2012
ALOKASI ANGGARAN Rp 11.982.974.795.000
BINA PELAKSANAAN WILAYAH II
BALAI BPJN IV (DKI, BANTEN, JABAR)
Rp. 65.017.703.000
BALAI BPJN V (JATENG, DIY, JATIM)
Rp. 3.567.189.803.000
Rp. 3.622.117.761.000
PPK I Pembinaan Sistem Pengendalian Rp. 447.023.632.000 PPK II Pembinaan Wilayah II Rp. 17.994.071.000
DKI Jakarta
Jawa Tengah
Rp 1.886.981.963.000
Rp.1.839.618943.000
Banten Rp. 430.662.404.000
D.I. Yogyakarta Rp.281.106.134.000
BALAI BPJN VIII (BALI, NTB, NTT) Rp. 728.649.528.000
Bali Rp . 777.161.162.000
NTB Rp. 1.459.150.029.000
BALAI BPJN VII BANJARMASIN Rp 4.557.550.884.000
Kalbar Rp. 1.149.500.669.000
Kalteng Rp. 953.330.604.000
Jawa Barat
Jawa Timur
NTT
Kalsel
Rp . 1.249.545.436.000
Rp 1.501.392.684.000
Rp . 2.492.338.337.000
Rp. 549,499,182.000
Kaltim Rp. 1.905.220.429.000
Catatan : DIPA revisi
VI.1. Pohon Anggaran Balai Besar Pelaksanaan Jalan Nasional IV TA.2012
BALAI BESAR PELAKSANAAN JALAN NASIONAL IV (DKI, BANTEN, JABAR) Rp. 3.567.189.803.000
DKI JAKARTA Rp. 1.886.981.963.000
BALAI BESAR PELAKSANAAN JALAN NASIONAL IV Rp. 1.145.878.677.000 PELAKSANAAN JALAN NASIONAL METROPOLITAN I JKT Rp. 157.985.770.000
BANTEN Rp. 430.662.404.000
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BANTEN Rp. 147.851.263.000
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BANTEN Rp. 215.731.083.000
PELAKSANAAN JALAN NASIONAL METROPOLITAN II JKT Rp. 245.428.046.000 PELAKSANAAN JALAN NASIONAL METROPOLITAN III JKT Rp. 167.609.019.000 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL KOTA METROPOLITAN Rp. 28.657.923.000
PELAKSANAAN JALAN BEBAS HAMBATAN TANJUNG PRIOK Rp. 1.145.878.677.000
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI BANTEN Rp. 30.730.915.000
SKPD DINAS BINA MARGA DAN TATA RUANG PROV. BANTEN Rp. 36.349.143.000
JAWA BARAT Rp. 1.249.545.436.000 PELAKSANAAN JALAN NASIONAL WILAYAH I PROV. JABAR Rp. 326.906.782.000 PELAKSANAAN JALAN NASIONAL WILAYAH II PROV JABAR Rp. 200.227.727.000 PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG Rp. 104.975.582.000 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JABAR Rp. 46.730.395.000
UNIT PERALATAN DAN PENGUJIAN CIKAMPEK Rp. 7.400.500.000
PELAKSANAAN JBH CISUMDAWU Rp. 437.754.642.000 SKPD DINAS BINA MARGA PROV JAWA BARAT Rp. 132.950.308.000
VI.2. Pohon Anggaran Balai Besar Pelaksanaan Jalan Nasional V TA.2012
BALAI BESAR PELAKSANAAN JALAN NASIONAL V (JATENG, DIY, JATIM) Rp. 3.622.117.761.000
JAWA TENGAH Rp.1.839.618.943.000
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATENG Rp. 437.049.333.000 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JATENG Rp. 473.228.191.000 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JATENG Rp. 32.230.411.000 PELAKSANAAN JALAN NASIONAL METROPOLITAN SEMARANG Rp. 199.587.864.000 PELAKSANAAN JALAN BEBAS HAMBATAN SOLO - KERTOSONO Rp. 608.809.732.000 SKPD DINAS BINA MARGA PROV JATENG Rp. 88.713.412.000
D.I. YOGYAKARTA Rp. 281.106.134.000
PELAKSANAAN JALAN NASIONAL WIL. PROVINSI D.I. YOGYAKARTA Rp. .243.113.340.000 PERENC. & PENGAWASAN JALAN NASIONAL PROV. D. I. YOGYA Rp. 9.658.818.000 SKPD DINAS PU, PERUMAHAN DAN ESDM PROV. DI. YOGYAKARTA Rp. 28.333.976.000
JAWA TIMUR Rp . 1.501.392.684.000 BALAI BESAR PELAKSANAAN JALAN NASIONAL V Rp.153.132.969.000 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATIM Rp.253.993.558.000 PELAKSANAAN JALAN NASIONAL WILAYAH II PROV. JATIM Rp. 284.681.090.000 PPELAKSANAAN JALAN NASIONAL METROPOLITAN II SURABAYA Rp. 377.981.210.000 PERANCANAAN DAN PENGAWASAN JALAN NASIONAL PROV. JATIM Rp. 41,205,135.000
PELAKSANAAN JALAN NASIONAL METROPOLITAN I SURABAYA Rp. 277.369.530.000 SKPD DINAS PU BINA MARGA JAWA TIMUR Rp. 113.029.192.000
VI.3. Pohon Anggaran Balai Besar Pelaksanaan Jalan Nasional VII TA.2012
BALAI BESAR PELAKSANAAN JALAN NASIONAL VII (KALBAR, KALTENG, KALSEL, KALTIM)
Rp. 4.557.550.884.000
KALIMANTAN BARAT Rp. 902.441.000.000
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALBAR Rp. 237.343.304.000 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALBAR Rp. 261.682.150.000 PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALBAR Rp. 212.066.994.000
KALIMANTAN TENGAH Rp. 989.328.759.000
KALIMANTAN TIMUR Rp. 1.365.581.437.000
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALTENG
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALTIM
Rp. 215.390.651.000
Rp. 421.981.857.000
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALTENG
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALTIM
Rp. 331.680.329.000
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALTENG
PELAKSANAAN JEMBATAN TAYAN Rp. 135.559.714.000
Rp. 336.835.877.000
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROV. KALBAR Rp. 28.313.001.000
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROV. KALTENG
SKPD DINAS PU PROV. KALIMANTAN BARAT Rp . 27.475.837.000
SKPD DINAS PU PROV. KALIMANTAN TENGAH Rp.70.000.000.000
Rp. 35.421.902.000
Rp. 470.483.802.000
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALTIM
Rp . 357.885.152.000 PERENC DAN PENGAWASAN JALAN NASIONAL PROV KALTIM
Rp . 55.230.626.000
DINAS PEKERJAAN UMUM PROP. KALIMANTAN TIMUR Rp. 60.000.000.000
KALIMANTAN SELATAN Rp. 560.000.000.000
BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
Rp. 64.912.500.000 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALSEL
Rp. 182.589.175.000 PELAKSANAAN JALAN NASIONAL WILAYAH II PROV KALSEL
Rp. 240.408.229.000
PERENC DAN PENGAWASAN JALAN NASIONAL PROV KALSEL
Rp. 41.519.996.000
DINAS PEKERJAAN UMUM PROP. KALIMANTAN SELATAN
Rp. 30.570.100.000
VI.4. Pohon Anggaran Balai Pelaksanaan Jalan Nasional VIII TA.2012 BALAI BESAR PELAKSANAAN JALAN NASIONAL VIII (BALI, NTB, NTT) Rp. 2.668.177.043.000
BALI Rp. 792.736.215.000
NUSA TENGGARA BARAT Rp. 682.818.828.000
NUSA TENGGARA TIMUR Rp. 1.192.622.000.000
BALAI PELAKSANAAN JALAN NASIONAL VIII Rp. 136.083.315.000
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI NTB Rp. 141.701.123.000
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI NTT Rp. 338.244.411.000
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BALI Rp. 248.815.733.000
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI NTB Rp. 291.590.693 .000
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI NTT Rp. 215.322.279.000
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BALI Rp. 88.629.827.000
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTB Rp. 212.639.422 .000
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTT Rp .233.533.916.000
PELAKSANAAN JALAN NASIONAL METROPOLITAN DENPASAR Rp. 281.390.007.000
PERENC. & PENGAWASAN JALAN NASIONAL PROV NUSA TENGGARA BARAT
Rp. 22.465.230.000
PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI NTT Rp. 360.201.131.000
SKPD DINAS PEKERJAAN UMUM PROVINSI NTB Rp. 14.222.360.000
PERENC. & PENGAWASAN JLN NAS PROV NUSA TENGGARA TIMUR Rp 38.414.553.000
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI BALI Rp. 28.138.019.000 DINAS PEKERJAAN UMUM PROVINSI BALI Rp. .9.679.314..000
DINAS PEKERJAAN UMUM PROP. NUSA TENGGARA TIMUR Rp. 6.905.710.000
VII. POHON ANGGARAN DIREKTORAT BINA PELAKSANAAN WILAYAH II TA.2011
ALOKASI ANGGARAN Rp. 12.126.952.317.000
Bina Pelaksanaan Wilayah II Rp. 74.238.230.000
PPK I Pembinaan Sistem Pengendalian Rp. 51.844.282.000
PPK II Pembinaan Wilayah II Rp. 22.393.948.000
BALAI IV (DKI, BANTEN, JABAR) Rp. 3.121.840.078.000
BALAI V (JATENG, DIY, JATIM) Rp. 3.159.596.000.000
BALAI VIIII (BALI, NTB, NTT) Rp. 2.518.347.817.000
BALAI VII KALIMANTAN Rp. 3.252.930.192.000
DKI Jakarta Rp. 1.701.000.000.000
Jawa Tengah Rp. 1.152.000.000.000
Bali Rp. 983.447.817.000
Kalbar Rp. 935.000.000.000
Banten Rp. 420.856.000.000
D.I. Yogyakarta Rp. 225.000.000.000
NTB Rp. 757.500.000.000
Kalteng Rp. 800.000.000.000
NTT Rp. 777.400.000.000
Kalsel Rp. 558.189.440.000
Jawa Barat Rp. 999.984.078.000
Jawa Timur Rp. 1.782.596.000.000
Kaltim Rp. 959.740.752.000
VII.1. Pohon Anggaran Balai Besar Pelaksanaan Jalan Nasional IV TA.2011
BALAI BESAR PJN - IV (DKI, BANTEN, JABAR) Rp. 3.121.840.078.000
DKI JAKARTA Rp. 1.701.000.000
BALAI BESAR PELAKSANAAN JALAN NASIONAL IV
Rp 148.113.696.000 PELAKSANAAN JALAN NASIONAL METROPOLITAN I JKT
Rp. 143.512.121.000 PELAKSANAAN JALAN NASIONAL METROPOLITAN II JKT
Rp. 126.719.201.000 PELAKSANAAN JALAN NASIONAL METROPOLITAN III JKT
Rp 117.170.149.000 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL KOTA METROPOLITAN
Rp. 25.325.588.000 PELAKSANAAN JALAN BEBAS HAMBATAN TANJUNG PRIOK
Rp. 1.140.159.245.000
BANTEN Rp. 420.856.000.000 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BANTEN
Rp. 177.090.354.000
JAWA BARAT Rp. 999.984.078.000 PELAKSANAAN JALAN NASIONAL WILAYAH I PROV. JABAR
Rp. 392.186.757.000
PELAKSANAAN JALAN NASIONAL WILAYAH II PROV JABAR PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BANTEN
Rp. 199.517.673.000
Rp. 246.664.875.000
PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG
Rp. 89.027.690.000
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI BANTEN
Rp. 14.332.519.000
SKPD DINAS BINA MARGA DAN TATA RUANG PROV. BANTEN
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JABAR
Rp. 37.639.032.000
UNIT PERALATAN DAN PENGUJIAN CIKAMPEK
Rp. 11.398.435.000
Rp. 29.925.454.000
PELAKSANAAN JBH CISUMDAWU
Rp. 132.655.420.000
SKPD DINAS BINA MARGA PROV JAWA BARAT
Rp. 132.655.420.000
VII.2. Pohon Anggaran Balai Besar Pelaksanaan Jalan Nasional V TA.2011 BALAI BESAR PJN - V (JATENG, DIY, JATIM) Rp. 3.159.596.000.000
JAWA TENGAH Rp. 1.152.000.000.000
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATENG Rp. 320.028.548.000 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JATENG Rp. 407.446.098.000 PELAKSANAAN JALAN NASIONAL METROPOLITAN SEMARANG Rp. 142.738.524.000 PELAKSANAAN JALAN BEBAS HAMBATAN SOLO - KERTOSONO Rp. 158.268.721.000 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JATENG Rp 32.579.378.000 SKPD DINAS BINA MARGA PROV JATENG Rp 90.938.731.000
D.I. YOGYAKARTA Rp. 225.000.000.000
PELAKSANAAN JALAN NASIONAL WIL. PROVINSI D.I. YOGYAKARTA Rp. 187.800.581.000 PERENC. & PENGAWASAN JALAN NASIONAL PROV. D. I. YOGYA Rp. 7.758.744.000 SKPD DINAS PU, PERUMAHAN DAN ESDM PROV. DI. YOGYAKARTA Rp. 29.440.675.000
JAWA TIMUR Rp. 1.782.596.000.000 BALAI BESAR PELAKSANAAN JALAN NASIONAL V Rp. 152.634.036.000 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATIM Rp. 272.868.381.000 PELAKSANAAN JALAN NASIONAL WILAYAH II PROV. JATIM Rp. 115.410.446.000 PELAKSANAAN JALAN NASIONAL METROPOLITAN I SURABAYA Rp. 244.215.625.000 PPELAKSANAAN JALAN NASIONAL METROPOLITAN II SURABAYA Rp. 279.493.825.000 PEMBANGUNAN JBT NASIONAL SURAMADU BENTANG TENGAH Rp. 551.366.846.000
PERENCANAAN JALAN NASIONAL JALAN NASIONAL PROV. JATIM Rp. 49.929.887.000 SKPD DINAS PU BINA MARGA JAWA TIMUR Rp. 116.676.954.000
VII.3. Pohon Anggaran Balai Besar Pelaksanaan Jalan Nasional V II TA.2011
BALAI BESAR PJN VII (KALBAR, KALTENG, KALSEL, KALTIM)
Rp. 3.252.930.192.000
KALIMANTAN BARAT Rp. 935.000.000.000
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALBAR Rp. 570.00.419.000 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALBAR Rp 158.470.216.000 PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALBAR Rp. 137.251.231.000 PELAKSANAAN JEMBATAN TAYAN Rp. 21.484.450.000 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROV. KALBAR Rp. 20.316.847.000 SKPD DINAS PU PROV. KALIMANTAN BARAT Rp 27.475.837.000
KALIMANTAN TENGAH Rp. 800.000.000.000
KALIMANTAN TIMUR Rp. 959.740.752.000
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALTENG
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALTIM
Rp. 240.576.627.000
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALTENG
Rp. 236.428.445.000
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALTENG
Rp. 222.773.449.000 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROV. KALTENG
Rp. 30.221.479.000 SKPD DINAS PU PROV. KALIMANTAN TENGAH Rp. 70.000.000.000
Rp. 242.705.247.000
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALTIM
Rp. 222.352.230.000
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALTIM
Rp 393.107.146.000 PERENC DAN PENGAWASAN JALAN NASIONAL PROV KALTIM
Rp 41.576.129.000
SKPD DINAS PEKERJAAN UMUM PROP. KALIMANTAN TIMUR
Rp. 60.000.000.000
KALIMANTAN SELATAN Rp. 558.189.440.000
BALAI BESAR PELAKSANAAN JALAN NASIONAL VII
Rp. 70.849.559.000 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALSEL
Rp. 121.188.654.000 PELAKSANAAN JALAN NASIONAL WILAYAH II PROV KALSEL
Rp. 307.028.699
PERENC DAN PENGAWASAN JALAN NASIONAL PROV KALSEL
Rp 28.552.428.000
SKPD DINAS PEKERJAAN UMUM PROP. KALIMANTAN SELATAN
Rp. 30.570.100.000
VII.4. Pohon Anggaran Balai Pelaksanaan Jalan Nasional VIII TA.2011
BALAI PJN VIII (BALI, NTB, NTT) Rp. 2.518.347.817.000
BALI Rp. 983.447.817.000
BALAI PELAKSANAAN JALAN NASIONAL VIII Rp 87.271.854.000 PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BALI Rp. 65.864.568.000 PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BALI Rp. 149.393.945.000 PELAKSANAAN JALAN NASIONAL METROPOLITAN DENPASAR Rp 646.466.524.000 PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI BALI Rp. 24.771.612.000 SKPD DINAS PEKERJAAN UMUM PROV BALI Rp. 9.679.314.000
NUSA TENGGARA BARAT Rp. 757.500.000.000
NUSA TENGGARA TIMUR Rp. 777.400.000.000
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI NTB Rp. 253.943.666.000z
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI NTT Rp. 172.979.298.000
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI NTB Rp. 210.838.057.000
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI NTT Rp. 143.505.738.000
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTB Rp. 260.864.521.000
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTT Rp 184.606.037.000
PERENC. & PENGAWASAN JALAN NASIONAL PROV NUSA TENGGARA BARAT
Rp. 17.631.396.000
P2JN PROVINSI NUSA TENGGARA TIMUR Rp 31.388.226.000
SKPD DINAS PEKERJAAN UMUM PROVINSI NTB Rp. 14.222.360.000
PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI NTT Rp. 238.014.946.000
SKPD DINAS PEKERJAAN UMUM PROP. NUSA TENGGARA TIMUR Rp. 6.905.710.000
VIII. PENYERAPAN DANA PER TAHUN ANGGARAN VII.1. Penyerapan Dana TA 2013
Status, 28 Juni 2013 Pagu (Rp Ribu)
No
Kode
Nam a Satuan Kerja
BALAI IV
BANTEN
Dokum en DIPA
Realisasi SP2D
eMonitoring
Paket
(Akun)
(Pengadaan)
(Rp Ribu)
4.675.282.714 4.675.282.714 7.814.607.455 1.020.878.421
484.423.304
484.423.304
548.602.540
114.825.160
%
Realisasi SPM (Rp Ribu)
%
Progres
Tanggal
Fisik (%)
Kirim
25,62 1.182.770.503
27,73
35,45
28,72
28,72
45,02
114.825.160
1
4299030
DINAS BINA MARGA DAN TATA RUANG PROVINSI BANTEN
38.579.300
38.579.300
38.579.300
7.995.312
20,72
7.995.312
20,72
78,28 20/06/2013 18:10
2
4487522
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI BANTEN
35.886.682
35.886.682
35.886.682
17.938.246
49,99
17.938.246
49,99
52,64 25/06/2013 21:44
3
4498603
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BANTEN
153.510.114
153.510.114
156.010.114
36.359.615
23,69
36.359.615
23,69
27,71
4
4498604
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BANTEN
256.447.208
256.447.208
318.126.444
52.531.987
20,48
52.531.987
20,48
21,46 26/06/2013 16:24
31,51
34,04
DKI
1.713.801.339 1.713.801.339 4.151.809.762
453.274.543
27,01
602.762.700
28/06/2013 9:29
1
BALAI BESAR PELAKSANAAN JALAN 4447956 NASIONAL IV (BANTEN, DKI, DAN JABAR) DI DKI JAKARTA
225.991.549
225.991.549
228.027.549
25.926.288
11,47
25.933.666
11,48
11,31 17/06/2013 14:25
2
4495421
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL KOTA METROPOLITAN JAKARTA
30.993.607
30.993.607
33.704.607
11.472.798
37,02
11.472.798
37,02
43,11 19/06/2013 22:56
3
4498597
PELAKSANAAN JALAN NASIONAL METROPOLITAN I JAKARTA
253.392.670
253.392.670
253.392.670
91.274.649
36,02
91.274.649
36,02
47,41 20/06/2013 10:42
4
4498781
PELAKSANAAN JALAN NASIONAL METROPOLITAN II JAKARTA
306.738.765
306.738.765
306.738.765
62.608.373
20,41
62.608.373
20,41
39,64 24/06/2013 15:30
5
4498600
PELAKSANAAN JALAN NASIONAL METROPOLITAN III JAKARTA
320.168.900
320.168.900
320.168.900
84.318.023
26,34
91.591.490
28,61
31,96 27/06/2013 13:31
VII.1. Penyerapan Dana TA 2013 (lanjutan) Pagu (Rp Ribu) No
6
Kode
4447919
Nama Satuan Kerja
PELAKSANAAN JALAN BEBAS HAMBATAN TANJUNG PRIOK JABAR
1
4029515 DINAS BINA MARGA PROV. JAWA BARAT
2
4471662
3
Dokumen DIPA 576.515.848
Realisasi SP2D
eMonitoring
Paket
(Akun)
(Pengadaan)
576.515.848 3.009.777.271
2.477.058.071 2.477.058.071 3.114.195.153
Realisasi SPM
Progres
Tanggal
Fisik (%)
Kirim
(Rp Ribu)
%
(Rp Ribu)
%
177.674.412
30,82
319.881.724
55,49
30,78 25/06/2013 19:06
22,97
27,28
452.778.718
21,13
465.182.643
90.671.846
90.671.846
90.671.846
33.772.568
37,25
33.772.568
37,25
38,7 12/06/2013 11:10
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JABAR
79.245.108
79.245.108
86.494.353
10.119.065
12,77
19.689.952
24,85
35,35 20/06/2013 14:38
4498605
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JABAR
371.824.425
371.824.425
446.812.667
120.246.425
32,34
123.079.463
33,1
48,09 28/06/2013 13:40
4
4498606
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JABAR
1.019.885.148 1.019.885.148 1.019.885.148
197.666.835
19,38
197.666.835
19,38
16,04 25/06/2013 16:08
5
4498634
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALBAR
413.425.994
413.425.994
413.425.994
86.927.355
21,03
86.927.355
21,03
18,2 27/06/2013 13:54
6
4498619
PELAKSANAAN JALAN BEBAS HAMBATAN CISUMDAWU
491.762.800
491.762.800 1.046.662.395
1.499.738
0,3
1.499.738
0,3
9,85 25/06/2013 11:19
7
4648080
UNIT PERALATAN DAN PENGUJIAN CIKAMPEK
2.546.732
24,86
2.546.732
24,86
24,72
1
10.242.750
10.242.750
10.242.750
26/06/2013 1:10
BALAI V
3.189.427.193 3.189.427.193 4.383.094.781
659.355.236
25,63
678.486.933
26,09
41,24
JATENG
1.558.526.010 1.558.526.010 2.055.646.991
286.598.223
20,59
293.800.035
21,44
31,32
21,12
33,18 20/06/2013 11:59
4039664 DINAS BINA MARGA PROV. JAWA TENGAH
90.829.202
90.829.202
90.829.202
16.017.081
17,63
19.178.717
VII.1. Penyerapan Dana TA 2013 (lanjutan) Pagu (Rp Ribu) No
Kode
Nama Satuan Kerja
2
4485355
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JAWA TENGAH
3
4488119
4
5
Dokumen DIPA
Realisasi SP2D
eMonitoring
Paket
(Akun)
(Pengadaan)
(Rp Ribu)
%
Realisasi SPM (Rp Ribu)
%
Progres
Tanggal
Fisik (%)
Kirim
41.557.166
41.557.166
41.557.166
11.527.568
27,74
11.527.568
27,74
43,05 21/06/2013 12:57
PELAKSANAAN JALAN NASIONAL METROPOLITAN SEMARANG
315.936.517
315.936.517
315.936.517
77.903.210
24,66
77.903.210
24,66
37,37 28/06/2013 11:57
4498620
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATENG
601.172.342
601.172.342
992.978.695
89.176.044
14,83
89.176.044
14,83
15,74
4474981
PELAKSANAAN JALAN NASIONAL WILAYAH II PROPINSI JAWA TENGAH
509.030.783
509.030.783
614.345.411
91.974.320
18,07
96.014.496
18,86
27,26 28/06/2013 14:04
20,74
36,68
JATIM
1
4059698 DINAS BINA MARGA PROV. JAWA TIMUR
2
BALAI BESAR PELAKSANAAN JALAN 4447962 NASIONAL V (JATENG, DIY, JATIM) DI SURABAYA
3
4471735
4
1.266.592.999 1.266.592.999 1.894.151.011
261.544.234
20,23
273.474.119
28/06/2013 6:22
90.000.000
90.000.000
90.000.000
35.336.683
39,26
35.336.683
39,26
47,33 28/06/2013 14:16
165.656.436
165.656.436
165.656.436
20.309.653
12,26
20.309.653
12,26
11,76 28/06/2013 10:14
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JAWATIMUR
40.314.103
40.314.103
54.996.742
5.545.459
13,76
5.545.459
13,76
44,63 27/06/2013 23:32
4498623
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATIM
217.672.860
217.672.860
217.672.860
31.366.423
14,41
31.366.423
14,41
20,58 27/06/2013 14:49
5
4498625
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JATIM
279.141.589
279.141.589
279.173.989
69.574.079
24,92
69.574.079
24,92
34,4 27/06/2013 11:15
6
4488131
PELAKSANAAN JALAN NASIONAL METROPOLITAN I SURABAYA
142.340.558
142.340.558
417.165.561
17.469.443
12,27
17.469.443
12,27
34,36 24/06/2013 11:34
7
4498631
PELAKSANAAN JALAN NASIONAL METROPOLITAN II SURABAYA
331.467.453
331.467.453
669.485.423
81.942.494
24,72
93.872.379
28,32
63,71
25/06/2013 8:46
VII.1. Penyerapan Dana TA 2013 (lanjutan) Pagu (Rp Ribu) No
Kode
Nama Satuan Kerja
DIY
1
DINAS PEKERJAAN UMUM, PERUMAHAN 4049029 DAN ENERGI SUMBER DAYA MINERAL PROVINSI D.I. YOGYAKARTA
2
4485361
3
4498622
Realisasi SP2D
Dokumen DIPA
eMonitoring
Paket
(Akun)
(Pengadaan)
364.308.184
364.308.184
433.296.779
(Rp Ribu)
111.212.779
Realisasi SPM
%
36,07
(Rp Ribu)
111.212.779
%
Progres
Tanggal
Fisik (%)
Kirim
36,07
55,73
29.443.460
29.443.460
29.443.460
13.343.148
45,32
13.343.148
45,32
78,24
18/06/2013 8:17
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI DI. JOGYAKARTA
12.960.682
12.960.682
13.581.640
4.388.434
33,86
4.388.434
33,86
45,94
28/06/2013 8:59
PELAKSANAAN JALAN NASIONAL WILAYAH PROVINSI D.I. YOGYAKARTA
321.904.042
321.904.042
390.271.679
93.481.197
29,04
93.481.197
29,04
43 26/06/2013 16:06
BALAI VII
5.699.452.169 5.699.452.169 8.133.127.902 1.618.511.030
29,19 1.658.894.648
29,67
41,19
KALBAR
1.150.749.187 1.150.749.187 1.706.034.387
22,52
22,54
32,11
206.912.745
207.112.733
4139034
DINAS PEKERJAAN UMUM PROVINSI KALIMANTAN BARAT
21.355.901
21.355.901
21.355.901
7.621.174
35,69
7.621.174
35,69
45,73
2
4485412
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN BARAT
45.677.186
45.677.186
47.927.186
11.862.651
25,97
11.862.651
25,97
50,14 21/06/2013 10:24
3
4498632
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALBAR
494.824.070
494.824.070
494.824.100
132.285.338
26,73
132.285.338
26,73
22,68 27/06/2013 12:09
4
4498633
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALBAR
224.122.613
224.122.613
224.122.613
52.853.989
23,58
53.053.977
23,67
32,03 28/06/2013 11:00
5
4498635 PELAKSANAAN JEMBATAN TAYAN
364.769.417
364.769.417
917.804.587
2.289.593
0,63
2.289.593
0,63
9,96
28/06/2013 9:07
27/06/2013 9:27
VII.1. Penyerapan Dana TA 2013 (lanjutan) Pagu (Rp Ribu) No
Kode
Nama Satuan Kerja
KALTENG
Dokumen DIPA
Realisasi SP2D
eMonitoring
Paket
(Akun)
(Pengadaan)
1.268.621.584 1.268.621.584 1.567.265.025
(Rp Ribu)
444.430.684
Realisasi SPM
%
(Rp Ribu)
36,06
457.574.091
%
Progres
Tanggal
Fisik (%)
Kirim
36,66
44,81
1
4149027
DINAS PEKERJAAN UMUM PROV. KALIMANTAN TENGAH
58.959.566
58.959.566
58.959.570
20.112.443
34,11
20.112.443
34,11
48,62
2
4485421
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN TENGAH
45.074.761
45.074.761
50.834.808
18.365.292
40,74
18.365.292
40,74
46,01 28/06/2013 13:29
3
4498636
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALTENG
326.839.418
326.839.418
326.839.418
125.016.544
38,25
125.016.544
38,25
48,46 27/06/2013 14:09
4
4498638
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALTENG
397.455.998
397.455.998
690.339.388
138.502.925
34,85
138.502.925
34,85
40,26 27/06/2013 15:32
5
4498639
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALTENG
440.291.841
440.291.841
440.291.841
142.433.480
32,35
155.576.887
35,33
40,71 28/06/2013 14:05
27,61
39,74
KALSEL
897.428.068
897.428.068
1.118.284.232
274.022.592
26,83
277.506.827
28/06/2013 9:58
1
4159034 DINAS PEKERJAAN UMUM PROV. KALSEL
29.267.667
29.267.667
29.267.667
4.634.833
15,84
4.634.833
15,84
35,73 28/06/2013 11:25
2
BALAI BESAR PELAKSANAAN JALAN 4447971 NASIONAL VII (KALBAR, KALTENG, KALSEL DAN KALTIM) DI BANJARMASIN
89.566.799
89.566.799
137.258.383
22.218.466
24,81
25.702.701
28,7
36,71 28/06/2013 11:02
3
4472231
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN SELATAN
51.660.541
51.660.541
56.460.330
15.496.300
30
15.496.300
30
45,57 26/06/2013 12:36
4
4498643
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALSEL
350.301.918
350.301.918
454.439.783
100.972.794
28,82
100.972.794
28,82
44,04 28/06/2013 13:45
5
4498644
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALSEL
376.631.143
376.631.143
440.858.069
130.700.199
34,7
130.700.199
34,7
36,65 19/06/2013 14:14
VII.1. Penyerapan Dana TA 2013 (lanjutan) Pagu (Rp Ribu) No
Kode
Nama Satuan Kerja
KALTIM
1
DINAS PEKERJAAN UMUM DAN 4169031 KIMPRASWIL PROVINSI KALIMANTAN TIMUR
2
4485437
3
Dokumen DIPA
Realisasi SP2D
eMonitoring
Paket
(Akun)
(Pengadaan)
2.382.653.330 2.382.653.330 3.741.544.258
(Rp Ribu)
693.145.009
Realisasi SPM
%
31,34
(Rp Ribu)
716.700.997
%
Progres
Tanggal
Fisik (%)
Kirim
31,88
48,09
81.251.032
81.251.032
81.251.032
29.145.212
35,87
29.145.212
35,87
44,37
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN TIMUR
89.830.307
89.830.307
105.880.128
27.734.031
30,87
27.734.031
30,87
57,01 28/06/2013 13:57
4498640
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALTIM
864.125.977
864.125.977
937.370.147
233.390.909
27,01
256.946.897
29,73
50,74 28/06/2013 13:41
4
4498641
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALTIM
572.526.738
572.526.738
987.726.738
239.770.338
41,88
239.770.338
41,88
58,43 28/06/2013 12:11
5
4498642
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALTIM
774.919.276
774.919.276 1.629.316.213
163.104.519
21,05
163.104.519
21,05
29,92 25/06/2013 10:40
BALAI VIII
BALI
1
4229032 DINAS PEKERJAAN UMUM PROV. BALI
2
4485370
3
4
2.479.284.289 2.479.284.289 2.690.839.490
749.284.289
749.284.289
858.618.275
698.275.063
87,36
734.188.162
91,01
123,56
163.369.094
24,27
166.524.093
24,50
36,99
26/06/2013 8:22
8.970.452
8.970.452
15.127.550
2.699.997
30,1
2.699.997
30,1
70,4 27/06/2013 12:26
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI BALI
26.658.423
26.658.423
31.474.141
6.419.823
24,08
6.419.823
24,08
40,62 27/06/2013 15:48
4447993
BALAI PELAKSANAAN JALAN NASIONAL VIII (BALI,NTB,NTT) DI DENPASAR
100.005.825
100.005.825
100.005.825
24.757.417
24,76
24.757.417
24,76
25,87
28/06/2013 8:48
4488301
PELAKSANAAN JALAN NASIONAL METROPOLITAN DENPASAR
225.350.333
225.350.333
323.697.130
57.316.291
25,43
60.471.290
26,83
46,97
26/06/2013 9:29
VII.1. Penyerapan Dana TA 2013 (lanjutan) Pagu (Rp Ribu) No
Kode
Nama Satuan Kerja
Dokumen DIPA
Realisasi SP2D
eMonitoring
Paket
(Akun)
(Pengadaan)
(Rp Ribu)
%
Realisasi SPM (Rp Ribu)
%
Progres
Tanggal
Fisik (%)
Kirim
5
4498645
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BALI
302.346.561
302.346.561
302.360.934
51.306.190
16,97
51.306.190
16,97
6,63 28/06/2013 12:06
6
4498646
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BALI
85.952.695
85.952.695
85.952.695
20.869.376
24,28
20.869.376
24,28
31,42 24/06/2013 13:25
36,28
50,27
NTB
750.000.000
750.000.000
750.000.000
281.354.616
34,91
295.420.207
1
4239237 DINAS PEKERJAAN UMUM PROVINSI NTB
13.681.837
13.681.837
13.681.837
4.185.443
30,59
4.185.443
30,59
48,77
2
PERENCANAAN DAN PENGAWASAN JALAN 4485386 NASIONAL PROVINSI NUSA TENGGARA BARAT
49.472.752
49.472.752
49.472.752
15.396.975
31,12
15.396.975
31,12
54,02 28/06/2013 14:16
3
4498650
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI NTB
205.064.375
205.064.375
205.064.375
55.608.273
27,12
69.574.202
33,93
46,66 28/06/2013 14:35
4
4498651
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI NTB
271.772.883
271.772.883
271.772.883
114.904.545
42,28
114.904.545
42,28
43,9 27/06/2013 11:20
5
4498652
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTB
210.008.153
210.008.153
210.008.153
91.259.380
43,46
91.359.042
43,5
57,99 19/06/2013 11:11
NTT DINAS PEKERJAAN UMUM PROP. NUSA TENGGARA TIMUR
1
4249016
2
PERENCANAAN DAN PENGAWASAN JALAN 4485392 NASIONAL PROVINSI NUSA TENGGARA TIMUR
3
4498653
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI NTT
980.000.000
980.000.000
1.082.221.215
253.551.353
28,18
272.243.862
30,22
36,31
18/06/2013 9:47
9.086.804
9.086.804
9.086.804
2.136.771
23,52
2.136.771
23,52
60,99 27/06/2013 10:49
57.967.906
57.967.906
57.967.906
27.922.579
48,17
27.922.579
48,17
49,19
263.674.151
263.674.151
263.674.151
55.407.782
21,01
55.407.782
21,01
19,41 27/06/2013 14:44
27/06/2013 8:43
VII.1. Penyerapan Dana TA 2013 (lanjutan) Pagu (Rp Ribu) No
Kode
Nama Satuan Kerja Dokumen DIPA
Realisasi SP2D
eMonitoring
Paket
(Akun)
(Pengadaan)
(Rp Ribu)
%
Realisasi SPM (Rp Ribu)
%
Progres
Tanggal
Fisik (%)
Kirim
4
4498654
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI NTT
317.779.829
317.779.829
317.779.829
84.670.176
26,64
84.670.176
26,64
30,17 27/06/2013 15:10
5
4498657
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTT
152.419.203
152.419.203
152.419.203
32.114.390
21,07
50.806.899
33,33
27,98 28/06/2013 14:22
6
4498656
PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI NTT
179.072.107
179.072.107
281.293.322
51.299.655
28,65
51.299.655
28,65
30,11
40,26
42,10
20.745.717
40,26
42,1
37,94 4.275.085.963
42,95
56,71
DITBINLAK WIL II
1
4498708
DIREKTORAT BINA PELAKSANAAN WILAYAH II T O T A L ....................
51.525.902
51.525.902
51.525.902
51.525.902
16.094.972.267
16.094.972.267
51.525.902
51.525.902
11.290.476
11.290.476
23.073.195.530 4.008.310.226
21,91
21,91
20.745.717
27/06/2013 7:32
19/06/2013 9:32
VII.2. Penyerapan Dana TA 2012 PAGU e-Monitoring NO
REALISASI
PROGRES
NAMA SATUAN KERJA RPM
PLN
TOTAL
RPM
PLN
TOTAL
Keu
Fis
BALAI IV
2.169.260.024
1.397.929.779
3.567.189.803
2.069.862.217
460.333.831
2.530.196.048
89,32
91,02
BANTEN
403.869.220
26.793.184
430.662.404
396.984.201
26.582.724
423.566.926
98,84
100
1
SATUAN KERJA DINAS BINA MARGA DAN TATA RUANG PROVINSI BANTEN
36.349.143
0
36.349.143
36.067.609
0
36.067.609
99,23
100
2
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI BANTEN
30.730.915
0
30.730.915
30.533.088
0
30.533.088
99,36
99,39
3
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BANTEN
147.851.263
0
147.851.263
146.980.176
0
146.980.176
99,41
99,41
4
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BANTEN
188.937.899
26.793.184
215.731.083
183.403.328
26.582.724
209.986.053
97,34
99,95
82,67
85,41
DKI
858.958.363
1.020.623.100
1.879.581.463
781.429.072
410.930.553
1.192.359.624
1
BALAI BESAR PELAKSANAAN JALAN NASIONAL IV (BANTEN, DKI, DAN JABAR) DI DKI JAKARTA
95.997.028
38.025.000
134.022.028
85.867.854
0
85.867.854
64,07
60,5
2
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL KOTA METROPOLITAN JAKARTA
28.657.923
0
28.657.923
26.213.712
0
26.213.712
91,47
97,81
3
PELAKSANAAN JALAN NASIONAL METROPOLITAN I JAKARTA
157.985.770
0
157.985.770
156.593.436
0
156.593.436
99,12
99,99
4
PELAKSANAAN JALAN NASIONAL METROPOLITAN II JAKARTA
245.428.046
0
245.428.046
244.614.499
0
244.614.499
99,67
99,99
5
PELAKSANAAN JALAN NASIONAL METROPOLITAN III JAKARTA
167.609.019
0
167.609.019
161.877.982
0
161.877.982
96,58
98,96
6
PELAKSANAAN JALAN BEBAS HAMBATAN TANJUNG PRIOK
163.280.577
982.598.100
1.145.878.677
106.261.589
410.930.553
517.192.141
45,13
55,2
VII.2. Penyerapan Dana TA 2012 (lanjutan) PAGU e-Monitoring NO
REALISASI
PROGRES
NAMA SATUAN KERJA
JAWA BARAT
RPM
PLN
TOTAL
RPM
PLN
TOTAL
906.432.441
350.513.495
1.256.945.936
891.448.944
22.820.554
914.269.498
Keu
Fis
86,45
87,97
1
SKPD-TP DINAS BINA MARGA PROV. JAWA BARAT
132.950.308
0
132.950.308
132.930.463
0
132.930.463
99,99
100
2
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JABAR
46.630.395
100.000
46.730.395
43.844.620
0
43.844.620
93,82
98,56
3
PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG
102.925.932
2.049.650
104.975.582
100.963.322
0
100.963.322
96,18
97,91
4
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JAWA BARAT
326.906.782
0
326.906.782
326.626.157
0
326.626.157
99,91
100
5
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JABAR
174.552.672
25.675.055
200.227.727
172.135.233
22.820.554
194.955.787
97,37
94,61
6
PELAKSANAAN JALAN BEBAS HAMBATAN CISUMDAWU
115.065.852
322.688.790
437.754.642
108.049.426
0
108.049.426
24,68
24,71
7
UNIT PERALATAN DAN PENGUJIAN CIKAMPEK
7.400.500
0
7.400.500
6.899.723
0
6.899.723
93,23
100
BALAI V
3.355.361.233
266.756.528
3.622.117.761
3.145.369.120
181.775.558
3.327.144.679
93,54
97,24
JATENG
1.644.141.242
195.477.701
1.839.618.943
1.528.406.931
120.683.591
1.649.090.523
92,20
94,08
1
DINAS BINA MARGA PROV. JAWA TENGAH
88.713.412
0
88.713.412
86.478.832
0
86.478.832
97,48
100
2
SATUAN KERJA PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JAWA TENGAH
32.230.411
0
32.230.411
30.555.431
0
30.555.431
94,8
100
3
PELAKSANAAN JALAN NASIONAL WILAYAH II PROPINSI JAWA TENGAH
394.079.014
79.149.177
473.228.191
375.114.756
61.263.056
436.377.813
92,21
95,7
4
PELAKSANAAN JALAN NASIONAL METROPOLITAN SEMARANG
199.587.864
0
199.587.864
199.516.296
0
199.516.296
99,96
100
VII.2. Penyerapan Dana TA 2012 (lanjutan) PAGU e-Monitoring NO
REALISASI
PROGRES
NAMA SATUAN KERJA RPM
PLN
TOTAL
RPM
PLN
TOTAL
Keu
Fis
5
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATENG
321.720.809
115.328.524
437.049.333
274.134.526
59.420.535
333.555.061
76,32
77,37
6
PELAKSANAAN JALAN BEBAS HAMBATAN SOLO - KERTOSONO
607.809.732
1.000.000
608.809.732
562.607.090
0
562.607.090
92,41
91,39
D.I. YOGYAKARTA
281.106.134
0
281.106.134
278.687.991
0
278.687.991
96,80
100
28.333.976
0
28.333.976
28.330.539
0
28.330.539
99,99
100
1
DINAS PEKERJAAN UMUM, PERUMAHAN DAN ENERGI SUMBER DAYA MINERAL PROVINSI D.I. YOGYAKARTA
2
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI DI. JOGYAKARTA
9.658.818
0
9.658.818
8.794.020
0
8.794.020
91,05
100
3
PELAKSANAAN JALAN NASIONAL WILAYAH PROVINSI D.I. YOGYAKARTA
243.113.340
0
243.113.340
241.563.432
0
241.563.432
99,36
100
1.430.113.857
71.278.827
1.501.392.684
1.338.274.198
61.091.967
1.399.366.165
91,62
97,64
JAWA TIMUR 1
DINAS BINA MARGA PROV. JAWA TIMUR
113.029.192
0
113.029.192
113.005.975
0
113.005.975
99,98
100
2
BALAI BESAR PELAKSANAAN JALAN NASIONAL V (JATENG, DIY, JATIM) DI SURABAYA
152.049.219
1.083.750
153.132.969
136.618.932
0
136.618.932
89,22
91,09
3
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JAWA TIMUR
41.205.135
0
41.205.135
33.334.679
0
33.334.679
80,9
99,68
4
PELAKSANAAN JALAN NASIONAL METROPOLITAN I SURABAYA
277.369.530
0
277.369.530
272.961.686
0
272.961.686
98,41
100
5
PELAKSANAAN JALAN NASIONAL METROPOLITAN II SURABAYA
377.981.210
0
377.981.210
373.848.942
0
373.848.942
98,91
99,86
6
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATIM
183.798.481
70.195.077
253.993.558
149.890.114
61.091.967
210.982.081
83,07
93,97
7
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JATIM
284.681.090
0
284.681.090
258.613.870
0
258.613.870
90,84
98,87
VII.2. Penyerapan Dana TA 2012 (lanjutan) PAGU e-Monitoring NO
REALISASI
PROGRES
NAMA SATUAN KERJA RPM
PLN
TOTAL
RPM
PLN
TOTAL
Keu
Fis
BALAI VII
4.310.764.084
246.786.800
4.557.550.884
4.200.951.584
67.890.442
4.268.842.027
94,53
95,43
KALBAR
1.010.324.616
139.176.053
1.149.500.669
959.056.552
42.848.960
1.001.905.513
88,99
90,35
1
DINAS PEKERJAAN UMUM PROVINSI KALIMANTAN BARAT
27.475.837
0
27.475.837
26.631.273
0
26.631.273
96,93
98,44
2
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN BARAT
32.608.357
0
32.608.357
29.070.486
0
29.070.486
89,15
100
3
PELAKSANAAN JALAN NASIONAL WILAYAH I PROV.KALBAR
377.951.198
30.895.200
408.846.398
364.449.322
10.000.000
374.449.322
91,59
91,85
4
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALBAR
259.361.956
30.086.897
289.448.853
245.750.483
0
245.750.483
84,9
80,41
5
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALBAR
217.820.069
37.741.441
255.561.510
199.606.058
0
199.606.058
78,1
78,18
6
PELAKSANAAN JEMBATAN TAYAN
95.107.199
40.452.515
135.559.714
93.548.930
32.848.960
126.397.891
93,24
93,24
507.041.460
42.457.722
549.499.182
486.602.746
25.041.482
511.644.228
94,30
96,12
KALSEL 1
DINAS PEKERJAAN UMUM PROV. KALSEL
29.835.795
0
29.835.795
29.601.831
0
29.601.831
99,22
100
2
BALAI BESAR PELAKSANAAN JALAN NASIONAL VII (KALBAR, KALTENG, KALSEL DAN KALTIM) DI BANJARMASIN
68.623.301
1.912.500
70.535.801
60.441.277
0
60.441.277
85,69
96,65
3
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN SELATAN
39.249.996
0
39.249.996
39.024.495
0
39.024.495
99,43
100
4
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALSEL
157.996.048
19.526.040
177.522.088
150.190.637
19.100.546
169.291.183
95,36
85,02
5
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALSEL
211.336.320
21.019.182
232.355.502
207.344.506
5.940.936
213.285.442
91,79
98,92
VII.2. Penyerapan Dana TA 2012 (lanjutan) PAGU e-Monitoring NO
REALISASI
PROGRES
NAMA SATUAN KERJA RPM
KALTENG
PLN
TOTAL
RPM
PLN
TOTAL
Keu
Fis
953.330.604
0
953.330.604
946.620.591
0
946.620.591
98,61
98,26
1
DINAS PEKERJAAN UMUM PROV. KALIMANTAN TENGAH
70.000.000
0
70.000.000
68.261.596
0
68.261.596
97,52
98,21
2
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN TENGAH
33.223.240
0
33.223.240
32.337.074
0
32.337.074
97,33
98,88
3
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALTENG
210.812.253
0
210.812.253
207.430.624
0
207.430.624
98,4
99,04
4
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALTENG
318.570.837
0
318.570.837
318.269.730
0
318.269.730
99,91
100
5
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALIMANTAN TENGAH
320.724.274
0
320.724.274
320.321.567
0
320.321.567
99,87
95,15
1.840.067.404
65.153.025
1.905.220.429
1.808.671.695
0
1.808.671.695
96,24
97,01
KALTIM 1
DINAS PEKERJAAN UMUM DAN KIMPRASWIL PROVINSI KALIMANTAN TIMUR
56.882.241
0
56.882.241
56.868.868
0
56.868.868
99,98
100
2
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN TIMUR
65.446.675
0
65.446.675
64.071.309
0
64.071.309
97,9
100
3
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALTIM
501.920.493
0
501.920.493
500.535.251
0
500.535.251
99,72
100
4
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALTIM
712.479.927
0
712.479.927
709.560.516
0
709.560.516
99,59
98,88
5
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALTIM
503.338.068
65.153.025
568.491.093
477.635.751
0
477.635.751
84,02
86,18
VII.2. Penyerapan Dana TA 2012 (lanjutan) PAGU e-Monitoring NO
REALISASI
PROGRES
NAMA SATUAN KERJA RPM
BALAI VIII BALI
PLN
TOTAL
RPM
PLN
TOTAL
Keu
Fis
4.458.429.344
270.220.184
4.728.649.528
4.417.267.265
202.619.076
4.619.886.340
96,78
99,04
730.508.010
46.653.152
777.161.162
710.506.320
38.006.525
748.512.845
95,39
99,94
9.530.471
0
9.530.471
9.507.506
0
9.507.506
99,76
99,79
1
DINAS PEKERJAAN UMUM PROV. BALI
2
BALAI PELAKSANAAN JALAN NASIONAL VIII (BALI,NTB,NTT) DI DENPASAR
122.451.863
0
122.451.863
105.672.791
0
105.672.791
86,3
100
3
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI BALI
24.353.961
0
24.353.961
21.829.383
0
21.829.383
89,63
100
4
PELAKSANAAN JALAN NASIONAL METROPOLITAN DENPASAR
251.095.983
46.653.152
297.749.135
252.025.677
38.006.525
290.032.202
97,41
100
5
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BALI
236.959.904
0
236.959.904
235.447.543
0
235.447.543
99,36
99,85
6
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BALI
86.115.828
0
86.115.828
86.023.420
0
86.023.420
99,89
100
1.297.749.222
161.400.807
1.459.150.029
1.291.114.378
141.934.634
1.433.049.012
97,12
99,27
NTB 1
DINAS PEKERJAAN UMUM PROVINSI NTB
12.885.302
0
12.885.302
12.483.978
0
12.483.978
96,89
98,43
2
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI NUSA TENGGARA BARAT
39.407.549
0
39.407.549
36.696.711
0
36.696.711
93,12
100
3
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI NTB
413.055.458
0
413.055.458
412.927.190
0
412.927.190
99,97
100
4
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI NTB
458.869.924
101.734.276
560.604.200
456.672.002
86.813.987
543.485.989
96,95
97,91
5
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTB
373.530.989
59.666.531
433.197.520
372.334.497
55.120.647
427.455.144
98,67
100
VII.2. Penyerapan Dana TA 2012 (lanjutan) PAGU e-Monitoring NO
REALISASI
PROGRES
NAMA SATUAN KERJA RPM NTT
PLN
TOTAL
RPM
PLN
TOTAL
Keu
Fis
2.430.172.112
62.166.225
2.492.338.337
2.415.646.567
22.677.917
2.438.324.483
97,82
97,91
6.868.631
0
6.868.631
6.562.714
0
6.562.714
95,55
97,17
85.627.125
0
85.627.125
85.594.673
0
85.594.673
99,96
100
1
DINAS PEKERJAAN UMUM PROP. NUSA TENGGARA TIMUR
2
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI NUSA TENGGARA TIMUR
3
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI NTT
598.183.055
0
598.183.055
598.075.802
0
598.075.802
99,98
99,18
4
Pelaksanaan Jalan Nasional Wilayah II Provinsi NTT
654.470.102
0
654.470.102
654.092.479
0
654.092.479
99,94
99,45
5
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTT
513.085.057
0
513.085.057
509.182.180
0
509.182.180
99,24
99,4
6
PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI NTT
571.938.142
62.166.225
634.104.367
562.138.719
22.677.917
584.816.635
92,23
92,25
912.618.907 14.746.069.094
93,54
95,68
TOTAL DITBINLAK WIL II ..........
14.293.814.685
2.181.693.291 16.475.507.976 13.833.450.186
VII.3. Penyerapan Dana TA 2011 PAGU e-Monitoring NO
REALISASI
PROGRES
NAMA SATUAN KERJA RPM
PLN
TOTAL
RPM
PLN
TOTAL
Keu
Fis
BALAI IV
2.149.975.421
1.107.160.164
3.257.135.585
2.028.211.448
865.820.207
2.894.031.657
93,15
91,51
BANTEN
398.220.764
76.510.746
474.731.510
378.864.605
59.326.998
438.191.604
95,75
95,98
1
DINAS BINA MARGA DAN TATA RUANG PROVINSI BANTEN
47.868.406
0
47.868.406
47.780.659
0
47.780.659
99,82
100
2
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI BANTEN
14.322.519
0
14.322.519
14.151.358
0
14.151.358
98,8
99,54
3
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BANTEN
177.234.354
0
177.234.354
175.886.573
0
175.886.573
99,24
99,36
4
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BANTEN
158.795.485
76.510.746
235.306.231
141.046.015
59.326.998
200.373.014
85,15
85,01
92,33
88,23
DKI 1
P2JN KOTA METROPOLITAN JAKARTA
2
602.948.452
117.000
603.065.452
569.878.884
0
569.878.884
23.572.666
0
23.572.666
19.289.623
0
19.289.623
81,83
81,76
BALAI IV (BANTEN, DKI, DAN JABAR) DI DKI JAKARTA
144.800.615
117.000
144.917.615
126.258.732
0
126.258.732
87,12
74,2
3
PELAKSANAAN JALAN NASIONAL METROPOLITAN I JAKARTA
128.835.849
0
128.835.849
125.156.656
0
125.156.656
97,14
98,28
4
PELAKSANAAN JALAN NASIONAL METROPOLITAN II JAKARTA
186.432.282
0
186.432.282
182.995.716
0
182.995.716
98,16
88,82
5
PELAKSANAAN JALAN NASIONAL METROPOLITAN III JAKARTA
119.307.040
0
119.307.040
116.178.157
0
116.178.157
97,38
98,09
VII.3. Penyerapan Dana TA 2011 (lanjutan) PAGU e-Monitoring NO
REALISASI
PROGRES
NAMA SATUAN KERJA
JABAR
RPM
PLN
TOTAL
RPM
PLN
TOTAL
1.148.806.205
1.030.532.418
2.179.338.623
1.079.467.959
806.493.209
1.885.961.169
Keu
Fis
91,38
90,32
1
SKPD-TP DINAS BINA MARGA PROVINSI JAWA BARAT
99.944.779
0
99.944.779
99.726.083
0
99.726.083
99,78
99,67
2
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JABAR
34.771.772
0
34.771.772
31.597.891
0
31.597.891
90,87
100
3
PELAKSANAAN JALAN NASIONAL METROPOLITAN BANDUNG
67.062.690
27.365.000
94.427.690
64.540.380
24.781.458
89.321.838
94,59
99,98
4
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JAWA BARAT
385.031.563
39.620.165
424.651.728
371.050.073
29.512.163
400.562.236
94,33
98,4
5
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JABAR
241.704.121
27.578.253
269.282.374
237.753.436
26.804.151
264.557.587
98,25
98,57
6
PELAKSANAAN JALAN BEBAS HAMBATAN TANJUNG PRIOK
202.637.425
935.884.000
1.138.521.425
170.918.596
725.395.437
896.314.034
78,73
56,16
7
PELAKSANAAN JALAN BEBAS HAMBATAN CISUMDAWU
106.255.420
85.000
106.340.420
94.076.762
0
94.076.762
88,47
82,83
8
UNIT PERALATAN DAN PENGUJIAN CIKAMPEK
11.398.435
0
11.398.435
9.804.738
0
9.804.738
86,02
86,94
BALAI V
2.897.017.756
224.273.565
3.121.291.321
2.598.353.642
211.134.246
2.809.487.888
89,82
91,41
JATENG
985.388.996
150.870.140
1.136.259.136
941.037.542
140.863.419
1.081.900.961
94,20
93,10
1
DINAS BINA MARGA PROV. JAWA TENGAH
90.938.731
0
90.938.731
86.232.912
0
86.232.912
94,83
99,24
2
SNVT. PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI JAWA TENGAH
30.981.121
0
30.981.121
29.055.059
0
29.055.059
93,78
97,49
3
PELAKSANAAN JALAN NASIONAL METROPOLITAN SEMARANG
142.738.524
0
142.738.524
123.205.452
0
123.205.452
86,32
86,57
VII.3. Penyerapan Dana TA 2011 (lanjutan) PAGU e-Monitoring NO
REALISASI
PROGRES
NAMA SATUAN KERJA RPM
PLN
TOTAL
RPM
PLN
TOTAL
Keu
Fis
4
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATENG
238.661.113
30.726.960
269.388.073
227.731.732
25.942.509
253.674.241
94,17
77,31
5
PELAKSANAAN JALAN NASIONAL WILAYAH II PROPINSI JAWA TENGAH
324.800.786
119.143.180
443.943.966
319.202.954
114.920.910
434.123.864
97,79
98,68
6
PELAKSANAAN JALAN BEBAS HAMBATAN SOLO - KERTOSONO
157.268.721
1.000.000
158.268.721
155.609.433
0
155.609.433
98,32
99,32
84,12
87,60
JATIM
1.687.040.115
73.403.425
1.760.443.540
1.453.107.623
70.270.827
1.523.378.450
1
SKPD-TP DINAS BINA MARGA PROV. JAWA TIMUR
116.676.954
0
116.676.954
110.679.815
0
110.679.815
94,86
100
2
BALAI BESAR PELAKSANAAN JALAN NASIONAL V (JATENG, DIY, JATIM) DI SURABAYA
151.011.483
40.000
151.051.483
130.923.673
0
130.923.673
86,67
92,83
3
P2JN PROVINSI JAWATIMUR
43.169.477
0
43.169.477
30.869.442
0
30.869.442
71,51
87,57
4
PELAKSANAAN JALAN NASIONAL METROPOLITAN I SURABAYA
188.204.764
0
188.204.764
104.100.362
0
104.100.362
55,31
50,75
5
PELAKSANAAN JALAN NASIONAL METROPOLITAN II SURABAYA
285.784.096
16.209.729
301.993.825
253.554.063
13.187.131
266.741.194
88,33
85,04
6
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATIM
219.648.049
57.153.696
276.801.745
208.004.154
57.083.696
265.087.850
95,77
99,96
7
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JATIM
131.178.446
0
131.178.446
118.690.085
0
118.690.085
90,48
84,65
8
PEMBANGUNAN JEMBATAN NASIONAL SURAMADU BENTANG TENGAH
551.366.846
0
551.366.846
496.286.029
0
496.286.029
90,01
100
91,13
93,52
99,03
97,92
DIY 1
DINAS PEKERJAAN UMUM, PERUMAHAN DAN ENERGI SUMBER DAYA MINERAL PROVINSI D.I. YOGYAKARTA
224.588.645 29.440.675
0
224.588.645 0
29.440.675
204.208.477 29.156.013
0
204.208.477 0
29.156.013
VII.3. Penyerapan Dana TA 2011 (lanjutan) PAGU e-Monitoring NO
REALISASI
PROGRES
NAMA SATUAN KERJA RPM
2
P2JNL PROVINSI D. I. YOGYAKARTA
3
PELAKSANAAN JALAN NASIONAL WILAYAH PROVINSI D.I. YOGYAKARTA
PLN
TOTAL
RPM
PLN
TOTAL
Keu
Fis
7.347.389
0
7.347.389
6.203.992
0
6.203.992
84,44
84,85
187.800.581
0
187.800.581
168.848.472
0
168.848.472
89,91
97,78
BALAI VII
2.951.304.753
114.098.942
3.065.403.695
2.857.129.549
55.946.454
2.913.076.004
91,79
92,13
KALBAR
845.117.858
50.291.100
895.408.958
828.317.045
25.349.631
853.666.676
84,47
84,14
1
DINAS PEKERJAAN UMUM PROVINSI KALIMANTAN BARAT
29.975.837
0
29.975.837
29.709.581
0
29.709.581
99,11
99,53
2
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN BARAT
20.316.847
0
20.316.847
18.730.039
0
18.730.039
92,19
99
3
SNVT PELAKSANAAN JALAN NASIONAL WILAYAH I KALBAR
514.347.339
50.066.100
564.413.439
507.071.074
25.349.631
532.420.705
94,33
96,05
4
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALBAR
147.592.154
70.000
147.662.154
142.753.999
0
142.753.999
96,68
85,61
5
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALBAR
129.401.231
70.000
129.471.231
129.169.381
0
129.169.381
99,77
99,88
6
SKS. PELAKSANAAN JEMBATAN TAYAN
3.484.450
85.000
3.569.450
882.971
0
882.971
24,74
24,74
94,04
95,11
KALTENG
795.483.388
2.073.992
797.557.380
761.426.138
2.073.992
763.500.130
1
DINAS PEKERJAAN UMUM PROV. KALIMANTAN TENGAH
67.635.700
0
67.635.700
63.509.877
0
63.509.877
93,9
96,63
2
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN TENGAH
28.069.167
0
28.069.167
24.553.600
0
24.553.600
87,48
95,45
3
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALTENG
240.576.627
2.073.992
242.650.619
224.162.376
2.073.992
226.236.368
93,24
95,53
VII.3. Penyerapan Dana TA 2011 (lanjutan) PAGU e-Monitoring NO
REALISASI
PROGRES
NAMA SATUAN KERJA RPM
PLN
TOTAL
RPM
PLN
TOTAL
Keu
Fis
4
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALTENG
236.428.445
0
236.428.445
234.537.230
0
234.537.230
99,2
95,92
5
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALTENG
222.773.449
0
222.773.449
214.663.055
0
214.663.055
96,36
92,02
92,04
93,99
KALSEL
486.572.398
61.453.850
548.026.248
472.773.974
28.522.831
501.296.806
1
DINAS PEKERJAAN UMUM PROVINSI KALIMANTAN SELATAN
29.737.179
0
29.737.179
29.198.648
0
29.198.648
98,19
98,43
2
BALAI BESAR PELAKSANAAN JALAN NASIONAL VII (KALBAR, KALTENG, KALSEL DAN KALTIM) DI BANJARMASIN
62.313.966
37.000
62.350.966
56.884.109
0
56.884.109
91,23
95,51
3
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN SELATAN
28.562.988
0
28.562.988
28.147.827
0
28.147.827
98,55
99,91
4
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALSEL
89.120.346
33.674.810
122.795.156
84.996.718
7.853.118
92.849.837
75,61
76,09
5
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALSEL
276.837.919
27.742.040
304.579.959
273.546.672
20.669.713
294.216.385
96,6
100
96,63
95,30
KALTIM
824.131.109
280.000
824.411.109
794.612.392
0
794.612.392
1
DINAS PEKERJAAN UMUM PROV.KALIMANTAN TIMUR
60.000.000
0
60.000.000
59.952.233
0
59.952.233
99,92
100
2
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN TIMUR
40.481.129
0
40.481.129
38.672.299
0
38.672.299
95,53
99,88
3
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI KALTIM
248.705.247
0
248.705.247
245.321.793
0
245.321.793
98,64
90,96
4
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALTIM
253.378.723
0
253.378.723
250.745.241
0
250.745.241
98,96
95,54
5
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI KALTIM
221.566.010
280.000
221.846.010
199.920.826
0
199.920.826
90,12
90,1
VII.3. Penyerapan Dana TA 2011 (lanjutan) PAGU e-Monitoring NO
REALISASI
PROGRES
NAMA SATUAN KERJA
BALAI VIII BALI
RPM
PLN
TOTAL
RPM
PLN
TOTAL
Keu
Fis
2.249.774.430
325.017.093
2.574.791.523
2.201.948.256
271.748.275
2.473.696.530
95,21
97,82
862.086.086
124.805.437
986.891.523
830.241.721
113.042.058
943.283.779
92,01
98,92
1
DINAS PEKERJAAN UMUM PROV. BALI
9.679.314
0
9.679.314
9.475.219
0
9.475.219
97,89
99,4
2
BALAI PELAKSANAAN JALAN NASIONAL VIII (BALI,NTB,NTT) DI DENPASAR
89.215.560
0
89.215.560
83.503.320
0
83.503.320
93,6
95,24
3
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI BALI
24.771.612
0
24.771.612
16.576.744
0
16.576.744
66,92
99,37
4
PELAKSANAAN JALAN NASIONAL METROPOLITAN DENPASAR
521.661.087
124.805.437
646.466.524
506.152.694
113.042.058
619.194.752
95,78
100
5
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI BALI
65.864.568
0
65.864.568
65.128.527
0
65.128.527
98,88
100
6
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BALI
150.893.945
0
150.893.945
149.405.217
0
149.405.217
99,01
99,52
95,44
99,96
NTB
574.010.896
181.989.104
756.000.000
565.959.806
152.087.983
718.047.788
1
SKPD DINAS PEKERJAAN UMUM PROVINSI NTB
14.222.360
0
14.222.360
13.647.315
0
13.647.315
95,96
100
2
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI NUSA TENGGARA BARAT
16.131.396
0
16.131.396
15.400.219
0
15.400.219
95,47
100
3
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI NTB
253.943.666
0
253.943.666
253.203.820
0
253.203.820
99,71
100
4
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI NTB
101.782.888
109.055.169
210.838.057
99.964.891
109.054.866
209.019.756
99,14
99,86
5
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTB
187.930.586
72.933.935
260.864.521
183.743.561
43.033.117
226.776.678
86,93
99,92
VII.3. Penyerapan Dana TA 2011 (lanjutan) PAGU e-Monitoring NO
REALISASI
PROGRES
NAMA SATUAN KERJA
NTT
RPM
PLN
TOTAL
RPM
PLN
TOTAL
813.677.448
18.222.552
831.900.000
805.746.729
6.618.234
812.364.963
Keu
Fis
98,16
94,59
1
DINAS PEKERJAAN UMUM PROP. NUSA TENGGARA TIMUR
11.905.710
0
11.905.710
11.735.340
0
11.735.340
98,57
70,16
2
PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI NUSA TENGGARA TIMUR
31.388.226
0
31.388.226
30.961.864
0
30.961.864
98,64
98,44
3
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI NTT
182.979.298
0
182.979.298
182.547.678
0
182.547.678
99,76
99,81
4
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI NTT
168.505.783
0
168.505.783
167.477.277
0
167.477.277
99,39
99,76
5
PELAKSANAAN JALAN NASIONAL WILAYAH IV PROVINSI NTT
221.292.394
18.222.552
239.514.946
216.570.818
6.618.234
223.189.052
93,18
99,92
6
PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI NTT
197.606.037
0
197.606.037
196.453.752
0
196.453.752
99,42
99,46
10.248.072.360
1.770.549.764
12.018.622.124
9.685.642.895 1.404.649.182
11.090.292.079
92,49
93,22
TOTAL DITBINLAK WIL II
IX. DATA MULTIYEARS CONTRACTS (MYC)
No
Propinsi / Satker/ Paket
TOTAL KEBUTUHAN (Rp)
1
2
3
BALAI IV
A
TA 2013 (Rp)
TA 2014 (Rp)
TA 2015 (Rp)
4
5
6
7
8.000.000
58.368.279
63.344.316
21.571.000
133.330.000
0
49.619.000
62.140.000
21.571.000
SATKER : PELAKSANAAN JALAN NASIONAL METROPOLITAN II JAKARTA
130.000.000
0
49.000.000
60.000.000
21.000.000
49.000.000
60.000.000
21.000.000
619.000
2.140.000
571.000
619.000
2.140.000
571.000
130.000.000
SATKER : PERENCANAAN DAN PENGAWASAN JALAN NASIONAL KOTA METROLPOLITAN JAKARTA 1 Pengaw asan Pembangunan FO Gaplek JAWA BARAT
A
TA 2012 (Rp)
DKI JAKARTA
1 Pembangunan FO Gaplek B
151.283.595
Alokasi Kebutuhan Dana Per Tahun
3.330.000
0
3.330.000 17.953.595
8.000.000
8.749.279
1.204.316
17.953.595
8.000.000
8.749.279
1.204.316
-
SATKER : PELAKSANAAN JALAN BEBAS HAMBATAN CISUMDAWU 1 Supervisi / Pengaw asan Pembangunan Jalan Bebas Hambatan Cisumdaw u BALAI V D.I. YOGYAKARTA
A
SATKER : PELAKSANAAN JALAN NASIONAL WILAYAH PROVINSI D.I. YOGYAKARTA
1
Pembangunan Fly Over Jombor
B
SATKER : PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROV. DI. YOGYAKARTA
1
Pengaw asan Pembangunan Fly Over Jombor
1.338.043.990
299.368.374
558.119.650
438.883.943
42.072.023
122.381.750
56.931.609
52.617.363
12.832.778
-
119.981.750
56.639.609
51.317.363
12.024.778
2.400.000
292.000
1.300.000
808.000
DATA MYC (LANJUTAN) No
Propinsi / Satker/ Paket
TOTAL KEBUTUHAN (Rp)
Alokasi Kebutuhan Dana Per Tahun TA 2012 (Rp)
TA 2013 (Rp)
TA 2014 (Rp)
TA 2015 (Rp)
PROVINSI JAWA TENGAH
476.582.240
56.265.000
200.341.637
191.653.580
A
SATKER : PELAKSANAAN JALAN NASIONAL WILAYAH I PROV. JAWA TENGAH
150.000.000
25.984.000
70.000.000
54.016.000
1
Pelebaran jalan Wangon- Kr. Pucung- Batas Jabar
150.000.000
25.984.000
70.000.000
54.016.000
B
SATKER : PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JAWA TENGAH
31.233.710
37.479.900
16.068.630
31.233.710
37.479.900
16.068.630
1 Pembangunan FO Palur
84.782.240
-
84.782.240
28.322.023
C
SATKER : PELAKSANAAN JALAN NASIONAL METROPOLITAN SEMARANG
230.000.000
30.081.000
94.209.500
94.209.500
11.500.000
1
Pelebaran Jalan Semarang - Baw en (PBC)
230.000.000
30.081.000
94.209.500
94.209.500
11.500.000
D
SATKER : PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROV. JAWA TENGAH
11.800.000
200.000
4.898.427
5.948.180
753.393
1
Pengaw asan teknik jalan dan jembatan Wangon-Bts.Jabar
3.600.000
100.000
2.200.000
1.300.000
2
Pengaw asan Teknik Jalan Semarang - Baw en (PBC)
4.600.000
100.000
2.100.000
2.400.000
3
Pengaw asan Pembangunan FO Palur
3.600.000
598.427
2.248.180
JAWA TIMUR
739.080.000
186.171.765
305.160.650
234.397.585
A
SATKER : PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI JAWA TIMUR
231.600.000
59.249.543
111.365.882
60.984.575
1
Pembangunan Jembatan Damas
60.000.000
8.634.118
51.365.882
2
Pelebaran Jalan Bts. Kab. Pacitan - Jarakan (Trenggalek)
171.600.000
50.615.425
60.000.000
60.984.575
753.393 13.750.000
DATA MYC (LANJUTAN)
No
Propinsi / Satker/ Paket
TOTAL KEBUTUHAN (Rp)
Alokasi Kebutuhan Dana Per Tahun TA 2012 (Rp)
TA 2013 (Rp)
TA 2014 (Rp)
TA 2015 (Rp)
B
SATKER : PELAKSANAAN JALAN NASIONAL METROPOLITAN II SURABAYA
493.970.000
122.712.222
188.494.768
169.413.010
1
Pelebaran Jalan Bulu (Bts. Prov. Jateng) - Bts. Kota Tuban
184.250.000
50.755.232
73.494.768
60.000.000
Peningkatan Struktur Jalan Bojonegoro - Padangan (PBC)
159.500.000
35.978.495
55.000.000
61.646.505
6.875.000
Peningkatan Struktur Jalan Padangan - Ngaw i (PBC)
150.220.000
35.978.495
60.000.000
47.766.505
6.875.000
13.510.000,00
4.210.000,00
5.300.000,00
4.000.000,00
D
SATKER : PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROV. JAWA TIMUR
1
Pengaw asan Teknis Pelebaran Bulu (Bts. Jateng) - Bts. Kota Tuban
3.700.000
1.300.000
1.500.000
900.000
2
Supervisi Peningkatan Struktur Jalan Bojonegoro - Padangan (PBC)
3.230.000
830.000
1.200.000
1.200.000
3
Supervisi Peningkatan Struktur Jalan Padangan - Ngaw i (PBC)
3.030.000
830.000
1.200.000
1.000.000
4
Pengaw asan Teknis Pelebaran Jalan Bts. Kab. Pacitan-Jarakan (Trenggalek)
3.550.000
1.250.000
1.400.000
900.000
1.127.031.626
271.251.053
428.556.542
369.870.400
BALAI VII KALIMANTAN SELATAN
320.799.799
60.459.360
87.908.625
115.078.183
A
SATKER : PELAKSANAAN JALAN NASIONAL METROPOLITAN BANJARMASIN
150.000.000
60.000.000
50.000.000
40.000.000
1
Pembangunan Jembatan Fly Over Gatot Soebroto (Jln A. Yani - Bts. Kota Banjarmasin)
150.000.000
60.000.000
50.000.000
40.000.000
B
SATKER : PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALIMANTAN SELATAN
160.000.000
1 Pembangunan Jembatan Sei Basirih
160.000.000
-
35.000.000 35.000.000
70.000.000 70.000.000
13.750.000
57.353.631 57.353.631
55.000.000 55.000.000
DATA MYC (LANJUTAN) TOTAL KEBUTUHAN (Rp)
No
Propinsi / Satker/ Paket
C
SATKER : PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROVINSI KALIMANTAN SELATAN
10.799.799
1
Pengaw asan Teknis Fly Over Gatot Soebroto (Jln. Ahmad Yani - Bts Kota (Banjarmasin)) MYC
5.400.010
2
Pengaw asan Pembangunan Jembatan Sei Basirih
5.399.789
Alokasi Kebutuhan Dana Per Tahun TA 2012 (Rp)
459.360 459.360
TA 2013 (Rp)
2.908.625
TA 2014 (Rp)
5.078.183
2.308.625
2.632.025
600.000
2.446.158
KALIMANTAN BARAT
164.420.547
19.310.293
83.842.797
61.267.457
A
SATKER : PELAKSANAAN JEMBATAN TAYAN
164.420.547
19.310.293
83.842.797
61.267.457
1
Pembangunan Jalan Akses Jembatan Tayan
142.420.547
14.332.868
74.969.537
53.118.142
2
Supervisi Pembangunan Jembatan Tayan
22.000.000
4.977.425
8.873.260
8.149.315
KALIMANTAN TIMUR
641.811.280
191.481.400
256.805.120
193.524.760
A
SATKER : PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI KALTIM
627.000.000
188.100.000
250.800.000
188.100.000
1
Pelebaran Ruas Sp. Perdau - Batu Ampar I
159.500.000
47.850.000
63.800.000
47.850.000
2
Pelebaran Ruas Sp. Perdau - Batu Ampar II
165.000.000
49.500.000
66.000.000
49.500.000
3
Pelebaran Ruas Batu Ampar - Ma. Wahau
137.500.000
41.250.000
55.000.000
41.250.000
4
Pelebaran Ruas Sp. Perdau – Sp.3 Sangkulirang - Maloi
165.000.000
49.500.000
66.000.000
49.500.000
B
SATKER : PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROV. KALIMANTAN TIMUR
14.811.280
3.381.400
6.005.120
5.424.760
1
Pengaw asan Ruas Sp. Perdau - Batu Ampar I
3.702.820
845.350
1.501.280
1.356.190
TA 2015 (Rp)
2.353.631
2.353.631
DATA MYC (LANJUTAN)
No
Propinsi / Satker/ Paket
TOTAL KEBUTUHAN (Rp)
Alokasi Kebutuhan Dana Per Tahun TA 2012 (Rp)
TA 2013 (Rp)
TA 2014 (Rp)
2
Pengaw asan Ruas Sp. Perdau - Batu Ampar II
3.702.820
845.350
1.501.280
1.356.190
3
Pengaw asan Ruas Batu Ampar - Ma. Wahau
3.702.820
845.350
1.501.280
1.356.190
4
Pengaw asan Ruas Sp. Perdau – Sp.3 Sangkulirang - Maloi
3.702.820
845.350
1.501.280
1.356.190
3.202.500
2.295.800
906.700
PROVINSI BALI
3.202.500
2.295.800
906.700
A
SATKER : PERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROV. BALI
3.202.500
2.295.800
906.700
1
Pengaw asan MULTIYEARS Pembangunan Simp. Tak Sebidang / Underpass Dew a Ruci
3.202.500
2.295.800
906.700
2.619.561.711
580.915.227
1.045.951.171
BALAI VII
TOTAL DITBIN LAK WIL II ............... :
872.098.659
TA 2015 (Rp)
120.996.654
X. DATA PINJAMAN DAN HIBAH LUAR NEGERI (PHLN) SUMBER DANA 48340-IND TAHUN ANGGARAN 2013 DIREKTORAT BINA PELAKSANAAN WILAYAH 2 ALOKASI NO
SATKER
2 3
PELAKSANAAN JALAN NASIONAL WILAYAH II PROPINSI JAWA TENGAH PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JAMBI PELAKSANAAN JALAN METROPOLITAN PALEMBANG
4
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI LAMPUNG
5
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI LAMPUNG
6 7
8 9 10
11
12
PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI BANTEN PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JABAR PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATENG
FISIK PER T.A. %
PDP 1
REALISASI
PAKET
LINGKAR AMBARAWA ( SRIP ) Pal Merah Ring Road Jambi (SRIP) Eskalasi Palembang Western Ring Road PELEBARAN JALAN SP. TJ. KARANG/JLN. SOEKARNO HATTA (B. LAMPUNG) - SP. PUGUNG (Bandar Lampung ByPass A) PELEBARAN JALAN SP. TJ. KARANG/JLN. SOEKARNO HATTA (B. LAMPUNG) - SP.PUGUNG (Bandar Lampung ByPass B) PEMBANGUNAN JALAN BTS. KOTA CILEGON-PASAURAN (MYC/SRIP) CIANJUR RING ROAD SRIP IBRD (ESKALASI) PENINGKATAN STRUKTUR JALAN KABUYUTAN BRIDGE/LOSARIPEJAGAN SECTION I PEMBANGUNAN JALAN BREBES TEGAL BYPASS ESKALASI JALAN WIDANG LAMONGAN
PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JATENG PELAKSANAAN JALAN NASIONAL METROPOLITAN II SURABAYA PEMBINAAN ADMINSITRASI DAN PELAKSANAAN PENGENDALIAN PMU SRIP PHLN PEMBINAAN ADMINSITRASI DAN PELAKSANAAN PENGENDALIAN CTC SRIP IBRD 4834-IND PHLN
TOTAL .........................
PLN
TOTAL
PDP
PLN
TOTAL
RENC.(%)
REAL.(%)
2.416.000.000
7.350.000.000
9.766.000.000
0
0
0
0
0
0
11.403.560.000
13.535.000.000
24.938.560.000
0
2.568.335.680
2.568.335.680
10.3
0
0
600.000.000
1.400.000.000
2.000.000.000
0
0
0
0
0
0
24.459.280.000
26.286.600.000
50.745.880.000
0
9.599.864.320
9.599.864.320
18.92
0
0
17.838.720.000
19.171.400.000
37.010.120.000
0
0
0
0
0
0
3.000.000.000
14.464.000.000
17.464.000.000
0
2.762.423.175
2.762.423.175
15.82
0
0
90.000.000
10.000.000
100.000.000
0
0
0
0
0
0
1.882.000.000
4.391.000.000
6.273.000.000
0
0
0
0
0
0
10.448.000.000
25.893.000.000
36.341.000.000
0
462.978.156
462.978.156
1.27
0
0
149.280.000
771.360.000
920.640.000
0
72.141.662
72.141.662
7.84
0
0
197.562.600
1.086.707.400
1.284.270.000
0
23.391.000
23.391.000
1.82
0
0
0
6.900.000.000
6.900.000.000
0
0
0
0
0
0
72,484,402,600 121,259,067,400 193,743,470,000
0
15,489,133,993
15,489,133,993
7.995
0
0
SUMBER DANA AIPRD L - 002 TAHUN ANGGARAN 2013 DIREKTORAT BINA PELAKSANAAN WILAYAH 2 ALOKASI NO
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH I PROV.KALBAR
2
3
PENINGKATAN STRUKTUR JALAN ANJIR PASAR (BTS.PROV.KALTENG )- SERAPAT -
PROVINSI KALSEL
BTS.KOTA BANJARMASIN (EKS-02)
NASIONAL WILAYAH II
NASIONAL WILAYAH II PROVINSI NTB PELAKSANAAN JALAN
5
NASIONAL WILAYAH II PROVINSI NTB PELAKSANAAN JALAN
6
NASIONAL WILAYAH IV PROVINSI NTT
7
Eskalasi)
NASIONAL WILAYAH I
PELAKSANAAN JALAN 4
001. Pontianak - Tay an (EKB-01) (Pembay aran
PELAKSANAAN JALAN
PELAKSANAAN JALAN
FISIK PER T.A. %
PDP 1
REALISASI
PAKET PLN
TOTAL
3.000.000.000
5.000.000.000
8.000.000.000
6.326.358.000
39.553.000.000
4.937.438.000
PDP
PLN 0
TOTAL
5.679.775.280
RENC(%) REAL(%)
5.679.775.280
71
0
0
45.879.358.000
0 19.017.031.801 19.017.031.801
41.45
0
0
30.869.000.000
35.806.438.000
0 10.737.206.568 10.737.206.568
29.99
0
0
900.000.000
100.000.000
1.000.000.000
0
0
0
0
0
0
500.000.000
100.000.000
600.000.000
0
0
0
0
0
0
9.327.000.000
30.673.000.000
40.000.000.000
0
9.126.360.719
9.126.360.719
22.82
0
0
0
10.000.000.000
10.000.000.000
0
0
0
0
0
0
0 44.560.374.368 44.560.374.368
17,8
0
0
REKONSTRUKSI DAN PENINGKATAN JALAN MARTAPURA - DS. TUNGKAP (BTS. KAB. TAPIN) (EKS-01) PELEBARAN JALAN PAL. IV - KM 70 ENB 01C( MY ) (07) PELEBARAN JALAN KM. 70 - BTS CABDIN DOMPU ENB 02 ( MY ) (07) Peningkatan Kapasitas Jalan Aegela - Bts. Kota Ende (PHLN - EINRIP) no. ruas 009(PPK 12)
DIREKTORAT BINA
EINRIP REGIONAL SUPERVISION
PELAKSANAAN WILAYAH III
CONSULTANT TOTAL .....................
24.990.796.000 116.295.000.000 141.285.796.000
SUMBER DANA EON 25102002 TAHUN ANGGARAN 2013 DIREKTORAT BINA PELAKSANAAN WILAYAH 2
ALOKASI NO
SATKER
PERENCANAAN DAN
Paket 28, Pengaw asan
PENGAWASAN JALAN
Teknis Jalan dan Jembatan
NASIONAL PROVINSI
Tebelian-Sintang-Ng. Silat
KALIMANTAN BARAT
(Grant Jepang)
PELAKSANAAN JALAN 2
NASIONAL WILAYAH II PROVINSI KALBAR
PELAKSANAAN JALAN 3
NASIONAL WILAYAH II PROVINSI KALBAR
FISIK PER T.A. %
PDP
1
REALISASI
PAKET
Pelebaran Jalan Tebelian Sintang ( Grand Jepang )
Pelebaran Jalan Tebelian Sintang ( Grand Jepang )
TOTAL ...................
PLN
TOTAL
PDP
PLN
TOTAL
RENC.(%)
REAL.(%)
0
750.000.000
750.000.000
0
0
0
0
0
0
0
35.000.000
35.000.000
0
0
0
0
0
0
0
35.000.000.000
35.000.000.000
0
0
0
0
0
0
0
35,785,000,000
35,785,000,000
0
0
0
0
0
0
SUMBER DANA IP-529 TAHUN ANGGARAN 2013 DIREKTORAT BINA PELAKSANAAN WILAYAH 2
ALOKASI NO
SATKER
REALISASI
FISIK PER T.A.
PAKET
% PDP
PLN
TOTAL
0
170.000.000.000
170.000.000.000
0
4.043.937.000
4.043.937.000
0
174,043,937,000
174,043,937,000
PDP
PLN
TOTAL
RENC (%)
REAL (%)
PELAKSANAAN JALAN Pembangunan Jalan 1
BEBAS HAMBATAN
Tol Akses Tanjung
TANJUNG PRIOK
Priok Seksi E2
PELAKSANAAN JALAN 2
BEBAS HAMBATAN TANJUNG PRIOK
0 63.220.651.446 63.220.651.446
37.19
0
0
0
3.706.579.383
91.66
0
0
0 66,927,230,829 66,927,230,829
38.454
0
0
001. Perenc anaan dan Pengaw asan Jalan Tol Akses Tanjung Priok
3.706.579.383
Phase I TOTAL ..............
SUMBER DANA IP-531 TAHUN ANGGARAN 2013 DIREKTORAT BINA PELAKSANAAN WILAYAH 2 ALOKASI NO
SATKER
REALISASI
FISIK PER T.A.
PAKET
% PDP
PLN
TOTAL
PDP
PLN
TOTAL
RENC.(%)
REAL.(%)
001. Pembangunan PELAKSANAAN JALAN Jalan Tol Akses 1
BEBAS HAMBATAN
Tanjung Priok
TANJUNG PRIOK
Seksi E2 A (1,92
0
222.278.744.000
222.278.744.000
0 72.385.417.347 72.385.417.347
32.57
0
0
0
25.000.000.000
25.000.000.000
0 17.887.265.015 17.887.265.015
71.55
0
0
0
90.000.000
90.000.000
0
0
0
0
0
0
0
30.527.566.000
30.527.566.000
0
7.662.722.027
7.662.722.027
25.1
0
0
0
277,896,310,000
277,896,310,000
0 97,935,404,389 97,935,404,389
35.242
0
0
Km) 001. Pembangunan PELAKSANAAN JALAN Jalan Tol Akses 2
BEBAS HAMBATAN
Tanjung Priok
TANJUNG PRIOK
Seksi NS Link (2,24 Km) 002. Pembangunan
PELAKSANAAN JALAN Jalan Tol Akses 3
BEBAS HAMBATAN
Tanjung Priok
TANJUNG PRIOK
Seksi NS Direc t Ramp (1,10 Km) 001. Perenc anaan
PELAKSANAAN JALAN dan Pengaw asan 4
BEBAS HAMBATAN
Jalan Tol Akses
TANJUNG PRIOK
Tanjung Priok Phase II
TOTAL ...............
SUMBER DANA LOAN BELUM EFEKTIF TAHUN ANGGARAN 2013 DIREKTORAT BINA PELAKSANAAN WILAYAH 2 ALOKASI NO
SATKER
REALISASI
FISIK PER T.A.
PAKET
% PDP
PLN
TOTAL
PDP
PLN
TOTAL
RENC.(%) REAL.(%)
BALAI BESAR PELAKSANAAN 1
JALAN NASIONAL IV
PENGADAAN RANGKA
(BANTEN, DKI, DAN JABAR)
BAJA
0
100.000.000.000
100.000.000.000
0
0
0
0
0
0
0
479.990.000.000
479.990.000.000
0
0
0
0
0
0
0
800.000.000
800.000.000
0
0
0
0
0
0
16,000,000,000
824,790,000,000
840,790,000,000
0
0
0
0
0
0
DI DKI JAKARTA
4
PELAKSANAAN JALAN BEBAS HAMBATAN CISUMDAWU PELAKSANAAN JALAN BEBAS
5
HAMBATAN SOLO KERTOSONO
PEMBANGUNAN JALAN BEBAS HAMBATAN CISUMDAW U PHASE 1 PEMBANGUNAN TOL SOLO - KERTOSONO
TOTAL .................
IX. DATA KONDISI JALAN IX.1. Akhir Tahun 2011 dan Akhir Tahun 2012 IRMS SEMESTER II 2011 NO.
PROVINSI / SATKER
PANJANG JALAN NAS (SK)
PERSENTASE (%) MANTAP
TIDAK MANTAP
BAIK KM
Km
HASIL IRMS TAHUN 2012 SEMESTER 2
Target RENSTRA IRMS TA 2012
KONDISI JALAN
KONDISI JALAN
RUSAK RINGAN
RUSAK BERAT
Km
Km
Km
SEDANG
MANTAP
TIDAK MANTAP
PERSENTASE (%) MANTAP
TIDAK MANTAP
PERSENTASE (%) MANTAP
TIDAK MANTAP
DIREKTORAT WILAYAH II
92.03
7.97
14,548.73
8,739.29
4,782.34
720.65
306.37
13,521.63
1,027.02
92.94
7.06
92.05
7.95
BALAI IV
94.78
5.22
1,970.27
1,114.63
784.00
66.19
5.37
1,898.63
71.56
96.37
3.63
89.63
10.37
A BANTEN
89.14
10.86
476.49
183.23
264.03
24.77
4.47
447.26
29.24
93.86
6.14
100.00
-
B DKI JAKARTA
94.24
5.76
142.65
49.51
89.34
3.80
-
138.85
3.80
97.34
2.66
100.00
-
C JAWA BARAT
96.83
3.17
1,351.13
881.89
430.64
37.62
0.90
1,312.53
38.52
97.15
2.85
84.47
15.53
BALAI V
92.25
7.75
3,640.74
1,265.79
2,110.82
168.89
95.23
3,376.61
264.13
92.75
7.25
95.47
4.53
D JAWA TENGAH
93.17
6.83
1,390.57
432.00
865.47
93.00
0.10
1,297.47
93.10
93.30
6.70
89.21
10.79
E D.I.Y.
97.29
2.71
223.16
204.82
16.24
2.10
-
221.06
2.10
99.06
0.94
100.00
-
F JAWA TIMUR
91.07 89.66
8.93 10.34
2,027.01 6,363.64
628.97
1,229.11
73.79
95.13
1,858.08
168.93
BALAI VII
4,537.64
1,200.30
439.37
186.33
5,737.94
625.70
91.67 90.17
8.33 9.83
99.26 90.58
0.74 9.42
G KALIMANTAN BARAT
95.69
4.31
1,664.55
1,419.80
113.96
114.78
16.01
1,533.76
130.79
92.14
7.86
98.00
2.00
H KALIMANTAN TENGAH
84.98
15.02
1,714.83
1,112.79
398.89
122.98
80.18
1,511.67
203.16
88.15
11.85
87.30
12.70
I
97.26
2.74
866.09
790.99
63.23
8.95
2.91
854.22
11.87
98.63
1.37
96.28
3.72
J KALIMANTAN TIMUR
85.61
14.39
2,118.17
1,214.07
624.22
192.65
87.23
1,838.29
279.88
86.79
13.21
85.08
14.92
BALAI VIII
95.47
4.53
2,574.08
1,821.22
687.22
46.20
19.44
2,508.44
65.64
97.45
2.55
92.67
7.33
G BALI
99.67
0.33
535.23
448.77
85.65
0.80
-
534.43
0.80
99.85
0.15
99.25
0.75
H NTB
94.09
5.91
632.17
477.16
146.63
8.05
0.34
623.78
8.39
98.67
1.33
96.84
3.16
I
94.49
5.51
1,406.68
895.29
454.94
37.34
19.11
1,350.23
56.45
95.99
4.01
88.30
11.70
KALIMANTAN SELATAN
NTT
PENUTUP
Dengan mencermati semua penjelasan diatas baik dari mulai visi & misi, tupoksi, SDM program dan pencapaiannya, kami sebagai pejabat lama yang akan memberikan estafet kepemimpinan kepada pejabat baru, berpendapat bahwa capaian tersebut belum optimal. Namun kami sebagai satu tim kerja yang solid telah melaksanakan Tupoksi Direktorat Bina Bina Pelaksanaan Wilayah II secara kompak, saling mendukung dan saling percaya sehingga tercipta atmisfir yang kondusif dalam mengembangkan bakat dan kemampuan seluruh SDM dalam mengemban Tupoksi Direktorat Bina Pelaksanaan Wilayah II. Harapan kami pada pejabat baru dengan semangat dan pikiran yang lebih segar akan semakin meningkatkan kinerja Direktorat Bina Pelaksanaan Wilayah II dalam rangka mendukung pencapaian visi & misi Direktorat Jenderal Bina Marga.