MINISTRY OF ENERGY AND MINERAL RESOURCES OF REPUBLIC OF INDONESIA DIRECTORATE GENERAL OF NEW RENEWABLE ENERGY AND ENERGY CONSERVATION
FEED IN TARIFF & QUOTA IN RENEWABLE ENERGY IN INDONESIA By Director General of New Renewable Energy and Energy Conservation Presented at Conference of Indonesian Electrical Power Society (CIEPS) 2013 Jakarta, September 4th 2013 Energy and Mineral Resources for People’s Welfare
I.
ENERGY POLICY
3
II.
NATIONAL PRIMARY ENERGY MIX TARGET
4
III. EFFORTS TO INCREASE NRE UTILIZATION
5
IV. NRE DEVELOPMENT AND UTILIZATION STRATEGY V. NRE DEVELOPMENT CHALLENGES
Energy and Mineral Resources for People’s Welfare
7 15
1. ENERGY CONSERVATION : to increase energy efficiency on supply and demand side, e.g industrial sector, transportation, household and commercial. 2. ENERGY DIVERSIFICATION : to increase the share of new renewable energy use in the primary energy mix. e.g: NEW ENERGY a. Liqiufied Coal b. Coal Bed Methane c. Gasified Coal d. Nuclear e. Hidrogen f. Others methane
RENEWABLE ENERGY a. b. c. d. e. f.
Geothermal, Hidro, Bioenergy, Solar, Wind, Ocean wave and current.
Energy and Mineral Resources for People’s Welfare
CURRENT CONDITION 2011
2025 TARGET PRESIDENTIAL REGULATION NO. 5/2006
Biofuel 5%
ENERGY ELASTICITY= 1,65 NON FOSSIL ENERGY SHARE 5%
Energy and Mineral Resources for People’s Welfare
Nuclear, Hydro, Solar, Wind, and Other NRE 5%
Geothermal 5%
Liquified Coal 2%
ENERGY ELASTICITY LESS THAN 1 IN 2025 OPTIMIZING NEW RENEWABLE ENERGY SOURCES
1. IMPROVING POLICY AND REGULATION Some sub-sectors of renewable energy still has not been set. Therefore, the Government continues to improve the regulation of development and utilization of renewable energy, including the preparation of draft government regulations of new renewable energy. 2. CREATING MARKET through the supply and utilization of variuos NRE, obligating National Electric Company (PT PLN) to buy electricity, the application of Indonesian National Standard (SNI), etc. 3. FEED-IN TARIFF and CEILING PRICE Declared through the Minister of Energy and Mineral Resources Regulation, that regulate the FiT and ceiling price of electricity from renewable energy purchased by National Electric Company. 4. PROVIDING INCENTIVES AND FACILITIES Reduction of taxes and customs duties, licensing procedures more simple. Energy and Mineral Resources for People’s Welfare
5. THE FUNDING AND OTHER SUPPORTING Providing fund to improve energy acess in remote and isolated area 6. IMPROVING QUALITY AND QUANTITY OF HUMAN RESOURCES Education and training in the field of renewable energy Improving NRE networks, supporting the establishment of organization/association 7. INCREASING RESEARCH IN THE FIELD OF NEW RENEWABLE ENERGY Increase research cooperation; Increase kind of research 8. INCREASING COOPERATION WITH OTHER COUNTRY AND INTERNATIONAL ORGANIZATION Cooperation for capacity building and technology transfer Lessons learned for the implementation of new renewable energy policies and programs Increase new renewable energy market and technology for NRE component (small-scale turbine) abroad. Energy and Mineral Resources for People’s Welfare
1. Improvement of the national electricity supply through the development of Hydro Power Plant; 2. Improvement of the national electricity supply through the development of Bioenergy Plant; 3. Improvement of the electricity access in remote areas, small islands and border areas with Micro Hydro and Solar Power Plant; 4. Development of wind power and ocean energy plant pilot project in order to prepare the stage of commercialization.
Energy and Mineral Resources for People’s Welfare
1. CURRENT CONDITION Hydro Power Plant installed capacity: 5,711 MW Mini/Micro Hydro Power Plant installed capacity: 230 MW
2. DEVELOPMENT PROGRAM
Improving coordination with permitting authorithy; Harmonizing regulation in the field of hydropower; Providing capacity building, technical guidance, socialization and workshops in order to improve the quality of human resources To accelerate the Phase II of 10,000 MW Program To encourage investment in Micro/Mini Hydro PP through cooperative (Koperasi), private and other business enterprises in electricity supply. To encourage capability of domestic manufacturer; Providing government fund (APBN).
Energy and Mineral Resources for People’s Welfare
MINI/MICRO HYDRO POWER PLANT FEED IN TARIFF (MEMR REGULATION NO 4 YEAR 2012) Price for Medium Voltage (Rp/kWh)
Price for Low Voltage (Rp/kWh)
INCENTIVE FACTOR (F)
Jawa and Bali
656 x F
1,004 x F
1
Sumatera and Sulawesi
787 x F
1,205 x F
1.2
Kalimantan, West and East Nusa Tenggara
853 x F
1,305 x F
1.3
Maluku and Papua
984 x F
1,506 x F
1.5
WILAYAH
Note : This regulation will be revised, target on September finished
Energy and Mineral Resources for People’s Welfare
1. CURRENT CONDITION Biomass Power Plant on-grid installed capacity: 133,7 MW
2. EBT DEVELOPMENT INCENTIVES FOR ELECTRICAL ENERGY ON-GRID
Prioritization of local renewable energy development (no need auctioned) Electricity purchase obligation of renewable energy by PT PLN (Persero) Pricing based on economic (Feed-in-Tariff for electricity from renewable energy) The GoaI have already released the ministerial regulation on biomass Power Plant Tariff (MEMR Regulation No 19 Year 2013) Income tax incentives for investment in renewable energy Remission from Import charge for EBT Lincensing procedures facility Implementation of the feasibility study by the Government Energy and Mineral Resources for People’s Welfare
No.
Energi
Kapasitas
Harga Pembelian Listrik
Pengolahan Sampah Kota (MSW) dengan teknologi Zero Waste *) 1.
Tegangan Menengah
s.d 10 MW
Rp. 1.450,- / kWh
2.
Tegangan Rendah
s.d 10 MW
Rp. 1.798,- / kWh
Pengolahan Sampah Kota (MSW) dengan teknologi Landfill **) 1.
Tegangan Menengah
s.d 10 MW
Rp. 1.250,- / kWh
2.
Tegangan Rendah
s.d 10 MW
Rp. 1.598,- / kWh
Catatan : *) Teknologi Zero Waste merupakan teknologi pengelolaan sampah sehingga terjadi penurunan volume sampah yang signifikan melalui proses terintegrasidengan gasifikasi atau insenerasi; **)Teknologi Sanitary Landfill merupakan teknologi pengolahan sampah dalam suatu kawasan tertentu yang terisolir sampai aman untuk lingkungan
Energy and Mineral Resources for People’s Welfare
1. CURRENT CONDITION Solar Power Plant installed capacity: 27.23 MW 2. DEVELOPMENT PROGRAM As an incentive to encourage development of renewable energy including solar PV. The GoaI have already released the ministerial regulation on solar PV Power Plant Tariff (MEMR Regulation No 17 Year 2013) The tariff levels will be based on ceiling price of 25 cent/kWh (using modules with local content < 40%, i.e. considered as imported modules) and 30 cent/kWh (using modules with local content ≥ 40%) The application for the ceiling price will be done through bidding process using online system based on certain quota per annum The quotas have already determined by Director General of NRE&EC Total Quota : 140 MW in 82 locations Energy and Mineral Resources for People’s Welfare
SEBARAN LOKASI KUOTA KAPASITAS PLTS FOTOVOLTAIK TAHUN 2013
SUMUT: 2 MWp, 1 PLTS Nias, 2 MWp
ACEH: 4 MWp, 3 PLTS Sabang, 1 MWp Sinabang (Simeulue), 2 MWp Singkil, 1 MWp
KALBAR: 9.5 MWp, 7 PLTS Ketapang, 2.5 MWp Ngabang, 1 MWp Sanggau, 1.5 MWp Sintang, 1.5 MWp Nanga Pinoh, 1 MWp Sekadau, 1 MWp Putussibau, 1 MWp
BABEL: 13 MWp, 2 PLTS Bangka, 2 x 5 MWp Belitung, 3 MWp
KALSEL: 2 MWp, 1 PLTS Kotabaru, 2 MWp KALTENG: 2 MWp, 2 PLTS Sukamara, 1 MWp Nanga Bulik, 1 MWp
GORONTALO: 2 MWp, 1 PLTS Gorontalo, 2 MWp
SULTENG: 2 MWp, 2 PLTS Tolitoli, 1 MWp Kep. Banggai, 1 MWp
KALTIM: 2.5 MWp, 2 PLTS Nunukan, 1.5 MWp Tj Selor, 1 MWp
SULUT: 4 MWp, 4 PLTS Tahuna, 1 MWp Siau, 1 MWp Karakelong, 1 MWp Talaud, 1 MWp MALUT: 7.5 MWp, 6 PLTS Ternate-Tidore, 2.5 MWp Jailolo-Sofifi, 1 MWp Tobelo-Malifut, 1 MWp Bula, 1 MWp Bacan, 1 MWp Sanana, 1 MWp
PAPUA: 14.5 MWp, 7 PLTS Jayapura, 6 MWp Biak, 1.5 MWp Kaimana, 1 MWp Serui, 1 MWp Merauke, 1.5 MWp Nabire, 1.5 MWp Timika, 2 MWp PAPUA BARAT: 5 MWp, 3 PLTS Manokwari, 2 MWp Fak-fak, 1 MWp Sorong, 2 MWp
RIAU: 8.5 MWp, 6 PLTS Siak, 1 MWp Bengkalis, 1.5 MWp Ranai , 1 MWp Selat Panjang, 1.5 MWp Tj Balai Karimun, 2.5 MWp Tj Batu , 1 MWp SUMBAR: 2 MWp, 1 PLTS Mentawai, 2 x 1 MWp
BENGKULU: 1 MWp, 1 PLTS Muko-Muko, 1 MWp
JATIM: 4 MWp, 4 PLTS Kangean, 1 MWp Karimunjawa , 1 MWp Raas , 1 MWp Sapudi , 1 MWp
NTB: 17 MWp, 5 PLTS Sumbawa, 3 MWp Lombok Utara, 2 MWp Lombok Timur, 4 MWp Lombok Barat, 4 MWp Sistem Bima, 4 MWp
NTT: 14 MWp, 9 PLTS Kupang, 5 MWp Atambua, 1 MWp Rote, 1 MWp Alor, 1 MWp Adonara, 1 MWp Sumba Timur, 1 MWp Larantuka, 1 MWp Maumere-Ropa-Ende, 2 MWp Bajawa-Ruteng-Labuan Bajo, 1 MWp
Energy and Mineral Resources for People’s Welfare
SULTRA: 13 MWp, 7 PLTS Bombana, 1 MWp Kendari, 2 x 3 MWp Kolaka, 2 MWp Bau-Bau, 2 MWp Raha, 1 MWp Wangi-Wangi, 1 MWp
SULSEL: 1 MWp, 1 PLTS Selayar, 1 MWp
MALUKU: 10.5 MWp, 7 PLTS Ambon, 4.5 MWp Seram, 1 MWp Namlea, 1 MWp Tual, 1 MWp Dobo, 1 MWp Saumlaki, 1 MWp Tual, 1 MWp
1. CURRENT CONDITION Wind Power Plant installed capacity : 1.4 MW. Ocean Current/waves still in pilot project, some small-scale pilot (10 kW) are built,
e.g at Baron Beach, NTT 2. DEVELOPMENT PROGRAM Conducting feasibility study and pilot project for wind and ocean currents/waves power plant in the potencial area, e.g East Nusa Tenggara. Increasing foreign partnership in terms of capacity building, technology transfer in the development of Wind and Ocean Currents / Waves Power Plant Encouraging domestic industrial competitiveness to manufacture components of wind and ocean currents/waves power plant Developing policies Feed-in Tariff for electricity from wind power plant Energy and Mineral Resources for People’s Welfare
PRODUCTION COST The production cost is relatively higher than the conventional energy, so it’s difficult to compete with the conventional energy INVESTMENT
The investment cost is quite high. However, investment in new renewable energy industry is quite in demand by domestic investors TECHNOLOGY Some of technologies have been able to developed domestically, such as small to medium-scale power plant technologies; Renewable energy technologies are still provided by the foreign. HUMAN RESOURCE Quantity and quality of human resources in the field of renewable energy is still quite limited;
People’s acceptance for new renewable energy is still relatively low, since most of people feel more comfortable using conventional energy.
Energy and Mineral Resources for People’s Welfare
1. The national energy supply is still dominated by fossil
energy, while the new and renewable energy has not been widely utilized. 2. Development of New Renewable Energy and Energy Conservation in Indonesia need effort and hardly
Energy and Mineral Resources for People’s Welfare
support
MINISTRY OF ENERGY AND MINERAL RESOURCES
DIRECTORATE GENERAL OF NEW RENEWABLE ENERGY AND ENERGY CONSERVATION Pegangsaan Timur Street No. 1A Cikini, Jakarta 10320; Phone/Fax : +6221-31924540 e-mail:
[email protected]
Energy and Mineral Resourceswww.ebtke.esdm.go.id for People’s Welfare
PERKEMBANGAN KAPASITAS TERPASANG “on-grid” PEMBANGKIT TENAGA LISTRIK BERBASIS BIOMASA, BIOGAS & SAMPAH KOTA s.d TAHUN 2012 No
Nama Perusahaan
COD
Jenis kontrak
Lokasi
PLN Wilayah
Kapasitas Jenis biomasa Kontrak (MW) palm waste 5
1
PT Riau Prima Energy
2001 Excess power
Riau
PLN Wilayah Riau
2
PT Listrindo Kencana
2006 IPP
Bangka
PLN Wilayah Bangka
Palm waste
5
3
PT Growth Sumatra
2006 Excess power
Sumatera Utara
PLN Wilayah Sumut
Palm waste
6
4
2006 Excess power
Riau
PLN Wilayah Riau
palm waste
2
7 8
PT Indah Kiat Pulp & Paper PT Belitung Energy PT Growth Sumatra
2010 IPP 2010 Excess power
Belitung Sumatera Utara
PLN Wilayah Babel PLN Wilayah Sumut
Palm waste Palm waste
7 9
9
PT Pelita Agung
2010 Excess power
Riau
PLN Wilayah Riau
Palm waste
5
10
Permata Hijau Sawit
2010 Excess power
Riau
PLN Wilayah Riau
Palm waste
2
11 12 13
PT Navigat Organic PT Navigat Organic PT Growth Asia
2011 IPP 2011 IPP 2011 Excess power
Bali Bekasi Sumatera Utara
PLN Dist Bali PLN Dist Jabar PLN Wilayah Sumut
MSW MSW Palm waste
2 6 10
14
PT Growth Asia
2012 Excess power
Sumatera Utara
PLN Wilayah Sumut
Palm waste
10
15
PT Navigat Organic
2012 IPP
Bekasi
PLN Dist Jabar
MSW
6,5
TOTAL KAPASITAS “ONGRID”
Energy and Mineral Resources for People’s Welfare
75,5
No Nama Pengembang COD 1
Navigat Organic
2
Growth Steel Group 2013
3 4 5 6 7 8 9
2013
Growth Steel Group 2013 Growth Steel Group 2013 Growth Steel Group 2013 PT Nubika Jaya PT. Austindo Aufwind PT. Bioenergi Hijau PT. Canang Indah
10 PT Victorindo
2013 2013 2013 2013 2013
Jenis Lokasi kontrak IPP Bantar Gebang, Bekasi Excess Simalungun, power Sumut Excess Jambi power Excess Bekasi power Excess Pontianak power Excess Sumatera Utara power IPP Belitung IPP Excess power Excess power
Probolinggo Medan Sumatera Utara
TOTAL KAPASITAS “On Grid”
Energy and Mineral Resources for People’s Welfare
PPA Kontrak PLN Dist Jabar PLN Wilayah Sumut PLN Wilayah Sumsel PLN DisJabar
Jenis Biomassa Kapasitas MSW (sampah)
2
Palm waste ( limbah sawit) Palm waste
10
Status Konstruksi Konstruksi
10 Konstruksi
rice husk
10 Konstruksi
PLN Wilayah Kalbar PLN Wilayah Sumut PLN Babel
PLN Wilayah Sumut PLN Wilayah Sumut
Palm waste
10 Konstruksi
Palm waste
6 Konstruksi
POME Kotoran Sapi Palm waste Palm waste
1,2 1 3 5
58,2
Konstruksi Konstruksi Konstruksi PPA dengan PLN Wilayah Sumut