ADENDUM DOKUMEN PENGADAAN PEKERJAAN PEMBANGUNAN GEDUNG IGD, ICU DAN OK CITO RUMAH SAKIT UMUM KABUPATEN TANGERANG Terlampir Addendum Bill of Quantity (BQ)
TANGERANG, 16 JUNI 2011 POKJA PENGADAAN BARANG, PEKERJAAN KONSTRUKSI DAN JASA KONSULTANSI PROYEK APBD DAN APBN UNIT LAYANAN PENGADAAN (ULP) RUMAH SAKIT UMUM KABUPATEN TANGERANG ttd
DAFTAR MATERIAL YANG DIGUNAKAN PROYEK
: Rumah Sakit Umum Daerah ( RSUD )
LOKASI
: Jl. Ahmad Yani No.9 - TANGERANG
PEKERJAAN : MEKANIKAL DAN ELEKTRIKAL JENIS MATERIAL
NO A
PRODUCT
1 2 3 4 a b c
PEKERJAAN LISTRIK KABEL POWER Panel TM Transformator ARMATURE LAMPU Balast vitting Tabung
5
Panel
a
Komponent panel
b
Box panel
WECO,INDUSTIRA setara
4
Kabel Tray
Tri star,AJK
5
Switch
MK,Berker
6
Flood light
7
Conduit
Clipsal,EGA
B
Penangkal petir
EF,Thomas
C
Telephone
Panasonic
D
Tata Suara
TOA setara
E
Fire Alarm
Nittan,Apron setara
F
Nurse Call
Excelomm setara
B
4 BESAR Unindo,MG Unindo,Trafindo Lucolite setara PHILIPS voslo PHILIPS
MG
PHILIPS
PEKERJAAN MEKANIKAL 1
PLUMBING
1
Pipa GIP (medium Class)
2
Pipa PVC ( AW Class)
3
Valve -valve
Toyo,Kitz
4
Fitting GIP
Top Brand
5
Fitting PVC
6
Pompa Air bersih
EBARA,VERSA
7
Pipa air panas
ATP Toro PN 20
6
Pipa tembaga
Crane,Cembla
2
TATA UDARA
1
Isolasi
2
Unit AC
3
FIRE FIGHTING Pompa Kebakaran Valve -valve
PPI,Bakrie Wavin,Rucika
Wavin,TSK
Armaflex Panasonic,Daikin,Trane
FIRE BANK EBRAY,VERSA Toyo,Kitz
Hydrant Box
Apron
Seamese connection
Ozeky
ac - 1
REKAPITULASI BIAYA
PROYEK : Pembangunan IGD, ICU dan OK CITO Rumah Sakit Umum Kabupaten Tangerang : Jl. Ahmad Yani No.9 - TANGERANG LOKASI PEKERJAAN : MEKANIKAL DAN ELEKTRIKAL
NO
I
PEKERJAAN ELEKTRIKAL A. PEKERJAAN LISTRIK 1 Pek.Instalasi TM 2 Pekerjaan Panel 3 Pekerjaan Kabel Daya 4 Pekerjaan Instalasi 5 Testing B. C. D. E. F.
II
URAIAN
JUMLAH (Rp)
Rp Rp Rp Rp Rp
PEK.PENANGKAL PETIR PEK.INSTALASI TELEPHONE PEK.INSTALASI FIRE ALARM PEK.INSTALASI TATA SUARA PEK.INSTALASI NURSE CALL TOTAL PEKERJAAN ELEKTRIKAL
PEKERJAAN MEKANIKAL A PEKERJAAN PLUMBING B PEKERJAAN INSTALASI GAS MEDIK C PEKERJAAN TATA UDARA D PEKERJAAN FIRE HYDRANT E PEKERJAAN GENSET 200KVA F PEKERJAAN LIFT/ELEVATOR TOTAL PEKERJAAN MEKANIKAL TOTAL PEK. M & E
Rp Rp Rp Rp Rp Rp Rp
-
Rp Rp Rp Rp Rp Rp
-
Rp Rp
-
BILL OF QUANTITY ( BQ ) PROYEK : Pembangunan IGD, ICU dan OK CITO Rumah Sakit Umum Kabupaten Tangerang LOKASI : Jl. Ahmad Yani No.9 - Tangerang PEKERJAAN : Elektrikal NO
URAIAN PEKERJAAN
SAT.
A. 1 a
PEKERJAAN LISTRIK PEKERJAAN INSTALASI TEGANGAN MENENGAH Panel Tegangan Menengah Incoming Outgoing
Unit
1.00
-
b
Transformator 20 KV- 380/220V indoor type Kapasitas : 315 KVA lengkap elastmolt & acc Kabel N2SEBY 3x50mm2 Kabel N2XSY 3x1x50mm2 Instalasi Tegangan menengah Kabel tray 50cm Testing Tegangan Menengah Grounding Material bantu Total pekerjaan Instalasi TM
Unit
1.00
-
8.00 12.00 1.00 10.00 1.00 4.00 1.00
-
Unit
1.00
-
unit unit unit unit unit unit unit unit unit unit unit unit unit unit ls
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
-
c d e f g h i
2
Pekerjaan Panel Tegangan Rendah
a
Panel LVMDP dan Capasitor Bank 200 KVAR Panel bekerja Automatic dan berfungsi dengan baik Panel LP.01 Panel LP.02 Panel LP.03 Panel LP.04 Panel LP.PH Panel PP.AC 01 Panel PP.AC 02 Panel PP.AC 03 Panel PP.AC 04 Panel PP.Lift 1 Panel PP.Lift 2 Panel PP.Pump Panel Kontrol Genset Panel Elektronik Grounding
b c d e f g h i j k l m n o
m m ls m ls bh ls
VOL
Total pekerjaan Panel 3 3.1 a b c
Pekerjaan Kabel Daya Kabel daya dari Panel LVMDP ke : Panel LP.01 NYY 4x25mm2+BC 16mm2 Panel LP.02 NYY 4x25mm2+BC 10mm2 Panel LP.03 NYY 4x25mm2+BC 16mm2
HARGA SAT.
JUMLAH
-
m m m
25.00 35.00 37.00
-
Panel PP.AC.Bsmt NYY 4x35 mm2+BC 25mm2 e Panel PP.AC.01 NYY 4x35 mm2+BC 25mm2 f Panel PP.AC.02 NYY 4x35 mm2+BC 25mm2 g Panel PP.AC.03 NYY 4x50 mm2+BC 35mm2 k Panel PP.Lift.1 NYY 4x16 mm2+BC 10mm2 Panel PP.Lift.2 NYY 4x16 mm2+BC 10mm2 l Panel PP.Pompa NYY 4x6 mm2 m Panel Pompa Jockey FRC 4x1x6mm2 n Panel PP.Booster NYY 4x4 mm2 o Transformator NYY 4x1x300mm2 p Panel Genset NYY 4x1x300mm2 3.2 Kabel NYY 4x4mm2 dari Panel Pompa ke Pompa Kabel NYY 4x6mm2 dari Panel LP.03 ke LP.PH 3.3 grounding 3.4 Material bantu Total Pekerjaan Kabel daya
m m m m m m m m m m m m m ttk ls
10.00 27.00 37.00 40.00 65.00 64.00 60.00 60.00 70.00 14.00 18.00 20.00 45.00 2.00 1.00
-
INSTALASI. PENERANGAN & STK Lantai - 1 Instalasi Penerangan Instalasi Stopkontak TL 2x36 w TKI RM 300 Lampu Barret Exhaust fan type Ceilling Lampu EXIT 8W +Battery Down Light PLC 13 w TL 1x36w GMS+Batt Schakelar Tunggal Schakelar Double Stop kontak material bantu
ttk ttk bh bh bh bh bh bh bh bh bh ls
105.00 106.00 58.00 2.00 14.00 3.00 18.00 3.00 12.00 23.00 106.00 1.00
-
a b d e g h k l m n o p q
Lantai - 2 Instalasi Penerangan Instalasi Stopkontak TL 2x36 w TKI RM 300 Down Light PLC 13 w TL 2x36 W Mirror louvre M5 Lampu EXIT 8W +Battery Lampu Baca 10W +Wall Head TL 1x36w GMS+Batt Exhaust fan type Ceilling Schakelar Tunggal Schakelar Double Stop kontak material bantu
ttk ttk bh bh bh bh bh bh bh bh bh bh ls
117.00 79.00 60.00 16.00 10.00 3.00 15.00 3.00 8.00 22.00 26.00 79.00 1.00
-
a b d e g
Lantai - 3 Instalasi Penerangan Instalasi Stopkontak TL 2x36W TKI RM 300 Down Light PLC 13 w Lampu EXIT 8W +Battery
ttk ttk bh bh bh
87.00 51.00 48.00 14.00 2.00
-
4 4.1 a b c d e f g h i j k l
h i j k l m n o p q
Lampu Baca 10W +Wall Head TL 1x36w GMS+Batt Exhaust fan type Ceilling TL 2x36 W Mirror louvre M5 Schakelar Tunggal Schakelar Double Stop kontak dinding Stop kontak untuk TV Stop kontak untuk WH material bantu
bh bh bh bh bh bh bh bh bh ls
5.00 2.00 6.00 6.00 40.00 30.00 69.00 21.00 7.00 1.00
-
a b c d e f g h i j k
Lantai - 4 Instalasi Penerangan Instalasi Stopkontak TL 2x36W TKI RM 300 Down Light PLC 13 w Lampu EXIT 8W +Battery TL 1x36w GMS+Batt Schakelar Tunggal Schakelar Double Stop kontak dinding Stop kontak untuk WH material bantu
ttk ttk bh bh bh bh bh bh bh bh ls
33.00 21.00 27.00 4.00 2.00 2.00 4.00 4.00 13.00 8.00 1.00
-
a b d e f g h
R.Mesin Liff Instalasi Penerangan Instalasi Stopkontak TL 2x36W V.Shape Schakelar Tunggal Schakelar Double Stop kontak material bantu
ttk ttk bh bh bh bh ls
5.00 2.00 3.00 1.00 1.00 2.00 1.00
-
m m ls ls
394.00 20.00 1.00 1.00
-
ls
1.00
-
1.00 1.00 40.00 1.00 1.00 2.00 1.00
-
3.1 Kabel Tray 1 Kabel Tray lebar 30 cm Kabel Ladder 30cm 2 accerssories 3 Support,Hanger Total Pekerjaan Instalasi 5
Testing Commissionig
B a b c d e f g
INST. PENANGKAL PETIR Air Terminal Non Radio Active Radius 150m lengkap Tiang penyangga pipa GIP dia 3",2". Tinggi 4m NYY 1x70 mm2 Grounding & bak kontrol Ijin Depnaker Pipa PVC dia 1" Material bantu Total Pek. Penangkal Petir
bh bh m ls ls btg ls
C 1
2 3 4 5 6 7 8
D 1 2 3 a b c d e f g h i
PEKERJAAN TELEPHONE PABX capasitas 8/64 , lengkap UPS,montor,pc 1 Operator consule Peralatan bantu dan accessories MDF 200 pair Grounding Instalasi Outlet Telephone Outlet telephone Pesawat telephone exlusive Display Terminal box Tlp Kabel reiser dari MDF keTBTP ITC 40x2x0,6mm2 MDF Telekom Testing Total Pek. Telephone PEKERJAAN FIRE ALARM MCFA 20 Zone lengkap Battery charger Annunciator 20 zone Instalasi Fire Alarm Ioniztion Smoke Detector Rate of Rise Heat Detector Alarm Bell Indicator Lamp Manual push button Instalasi fire alarm Terminal box Material bantu Kabel reiser TBFA NYA 10x1x2,5mm2 Testing commissioning
Unit
1.00
-
bh ttk ttk ttk bh bh
1.00 1.00 47.00 24.00 2.00 4.00
-
m m ls
80.00 50.00 1.00
-
1.00 1.00
-
bh bh bh bh bh ttk bh ls
90.00 90.00 12.00 12.00 12.00 114.00 4.00 1.00
-
m ls
168.00 1.00
-
Unit Unit
Total Pek. Fire Alarm E 1
PEKERJAAN INSTALASI TATA SUARA Peralatan Utama Tata suara a)Back ground musik - Power Amplifier 240W - Mixer Amplifier - Radio Tuner AM/FM termasuk antena - CD Player - Paging Microphone - Cabinet Rack & Accessories - Speaker selector 3chanel - Emergency power suply - MDF - Kabel microphone dan accessories b) Peralatan Car call - Power Amplifier 100W - Paging Microphone + chimie - Horn speaker + tiang Supervisi
-
Unit
1.00
-
Unit
1.00
-
bh
4.00
-
2 3 4 5 6 7
Ceilling speaker Volume control Instalasi Tata suara Terminal box TS Kabel Reiser NYMHY 3x1,5mm2 dlm coduit Testing commissioning
bh bh ttk bh m ls
47.00 47.00 47.00 3.00 172.00 1.00
Total Pek. Tata Suara F 1 a b c d
PEKERJAAN INSTALASI NURSE CALL Master Control Nurse Call Annunciator 1way 24 signal monitor Power suply unit 24V dc 5A Chemne Priority with speaker Material bantu
2 3 4 5 6 7
Dome Light indicator w 2 lamp Nurse Presence monitor Bed call socket w/pendent Toilet Emergency call w/reset Instalasi Nurse Call Sub Panel
8 9
Kabel ITC 4x2x0,6mm2 Testing commissioning Total Pek. Nurse Call
-
Unit Unit Unit ls
2.00 2.00 2.00 1.00
-
bh bh bh bh ttk bh
19.00 19.00 35.00 20.00 93.00 20.00
-
m ls
520.00 1.00
-
BILL OF QUANTITY ( BQ ) PROYEK LOKASI PEKERJAAN
NO A
: Pembangunan IGD, ICU dan OK CITO Rumah Sakit Umum Kabupaten Tangerang : Jl. Ahmad Yani No.9 - TANGERANG : PLUMBING
URAIAN PEKERJAAN
SAT.
VOL
HARGA SAT.
JUMLAH
1
PEKERJAAN PLUMBING Instalasi Pipa Air Bersih Ruang Pompa & atap Pengadaan & pemasangan pompa air limbah/ slump
unit
2.00
-
2
Kapasitas : 400 liter/menit Head : 15 meter Putaran : 2900 rpm Panel Pompa lengkap WLC
unit
1.00
-
3
Package Booster pump (2 pompa) lengkap Panel
unit
1.00
-
4
Kapasitas : 100 liter/menit tiap pompa Roof tank 24 m3 Fiber glass 2 cell lengkap pondasi
bh
1.00
-
m m m ls set bh bh bh bh bh bh bh bh
35.00 52.00 36.00 1.00 1.00 5.00 4.00 6.00 2.00 2.00 2.00 2.00 2.00
-
set
1.00
-
bh bh bh bh bh bh
3.00 4.00 2.00 2.00 2.00 2.00
-
m m m m
246.00 60.00 96.00 709.00
-
5
Pemipaan Ruang Pompa & Roof Tank Pipa GIP 1,5" (pipa Transfer dari R.Pompa ke Roof Pipa GIP dia 2,5" (Reiser) Pipa GIP dia 2" (Reiser) Fitting Header pipa GIP 3"lengkap Fitting utk pompa Transfer Gate Valve dia 2,5" Gate Valve dia 2" Gate Valve dia 1,5" Check Valve dia 1,5" Strainer dia 2,5" Flexible Joint dia 2" Flexible Joint dia 2,5" Foot Valve dia 2,5"
6 7
8
Header pipa GIP 3"lengkap Fitting utk pompa Booster Valve - valve Gate valve dia 2" Gate Valve dia 1,5" Strainer dia 2" Flexible Joint dia 2" Flexible Joint dia 1,5" Foot Valve dia 2" Instalasi Pipa Air Bersih KM/WC Pipa GIP dia 2" Pipa GIP dia 1" Pipa GIP dia 3/4" Pipa GIP dia1/2"
Fitting- fitting 9
10
11 13
B 1 2 3 4 6 7 8 9 10 11 12
Valve2 Gate valve dia 2" Gate valve dia 1,5" Gate valve dia 1" Gate valve dia 3/4" Instalasi Pipa Air Kotor,Bekas,vent KM/WC Pipa PVC Ø 10" AW class Pipa PVC Ø 6" AW class Pipa PVC Ø 4" AW class Pipa PVC Ø 3" AW class Pipa PVC Ø 2,5" AW class Pipa PVC Ø 2" AW class Pipa PVC Ø 1" AW class (vent) Fitting- fitting Bak Kontrol Instalasi Pipa Air Panas Pipa ATP Toro PN 20 Ø 3/4" Pipa ATP Toro PN 20 Ø 1/2" Electric Water Heater 15 liter Gate valve dia 3/4" Total pek. Plumbing PEKERJAAN PIPA GAS MEDIK Wall point Outlet (vacum) Wall point Outlet (O2) Zone valve box Zone box Pipa tembaga dia 1" Pipa tembaga dia 1/2" Pipa tembaga dia 3/4" Pipa tembaga dia 3/8" Sistem Alarm Fitting -fiting Hanger,bracket Total pek. Gas Medik
ls
1.00
-
bh bh bh bh
5.00 2.00 5.00 37.00
-
m m m m m m m ls bh
62.00 240.00 280.00 160.00 48.00 260.00 80.00 1.00 8.00
-
m m bh bh
30.00 256.00 15.00 15.00
-
bh bh bh bh m m m m ls ls ls
57.00 57.00 5.00 5.00 350.00 740.00 175.00 275.00 1.00 1.00 1.00
-
BILL OF QUANTITY ( BQ ) PROYEK : Pembangunan IGD, ICU dan OK CITO Rumah Sakit Umum Kabupaten Tangerang LOKASI : Jl. Ahmad Yani No.9 - Tangerang PEKERJAAN : Fire Hydrant
NO
SAT.
VOL
HARGA SAT.
JUMLAH
PEKERJAAN HYDRANT 1
Pengadaan dan pemasangan pompa Hydrant lengkap, Panel Kontrol, Wiring & Pondasi
a
Electric Hydrant Pump unit Kap:500 GPM Total Head : 70 m Centrifugal end section Lengkap dengan tanki bahan bakar.Panel kontrol Putaran : 2900 RPM
1.00
-
b
Diesel Hydrant Pump unit Kap:500 GPM Total Head : 80 m Centrifugal end section Penggerrak diesel 4 langkah 60 PK Lengkap dengan tanki bahan bakar.Panel kontrol Putaran : 2900 RPM
1.00
-
1.00
-
10.00 75.00 192.00 8.00 2.00 2.00 3.00 6.00
-
c
Jockey Fire Pump lengkap dengan Panel kontrol dan wiring
unit
Kapasitas : 50 GPM Total Head : 90 m Putaran : 2900 RPM 2 a b c d e f g h
Instalasi Hydrant Ruang Pompa dan luar bangunan BS sch 40 Ø 6" m' BS sch 40 Ø 4" m' BS sch 40 Ø 2 1/2" m' BS sch 40 Ø 1 1/2" m' Header sch 40 Ø 8" set Gate Valve Ø 6" bh Gate Valve Ø 4" bh Gate Valve Ø 2 1/2" bh
i j k l m n o p q r s t u v w x y z aa ab ac ad ae
Check Valve Ø 2 1/2" Check Valve Ø 6" Flexible joint Ø 2 1/2" Flexible joint Ø 6" Strainer Ø 2 1/2" Strainer Ø 6" Foot Valve Ø 2 1/2" Foot Valve Ø 6" Pressure switch + gate valve Pressure gauge + gate valve AAV (Automatic air vent) Primink tank dan instalasi Safety Valve 2 1/2" Pressure Tank 1000 l Floating Valve dia. 3" Fitting Perijinan Material bantu, support,hanger Automatic air vent Hydrant Box dalam bangunan Hydrant Box luar bangunan Siammese Connection + Check Valve 4" Hydrant Pilar + Gate Valve dia 4" Total Pek. Fire Hydrant
bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh ls ls ls bh bh bh bh bh
1.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 12.00 2.00 1.00 2.00
-
DAFTAR HARGA BAHAN DAN UPAH NO A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
JENIS MATERIAL HARGA BAHAN Alkasit Amplas Bak fibreglass 0.3 m³ Bata merah Batu Alam Andesit batu pecah 1/2 beton Batu pecah/split 2/3 Besi beton polos besi plat strip P = 6 mm Calsiboard t = 10 mm Cat Duco Nippe 2000 Cat kayu/besi KW 2 (cat dasar) Cat kayu/besi KW 2 (cat penutup) Cat meni kayu Cat tembok Dulux/ICI Weathershield Cat tembok KW 2 (cat dasar) Cat tembok KW 2 (cat penutup) Compound gypsum Conduit pipa PVC dia ⅝" C Cornice gypsum lebar 5 s/d 10 cm Cornice gypsum lebih dari 10 cm Dolken kayu φ 8-10/4 m Door Closer downlight + SL 18 watt Phillips Elbow Engsel SS 3" Engsel SS 4" Flexible pipe Floor Drain SS - TOTO Genteng plentong kecil natural Granito tile 40x40 cm Grendel Jendela SS Gypsumboard Jaya t = 9 mm Gypsumboard Jaya t = 12 mm Gyptile t = 10 mm Haak Angin Jdl SS Handle Pintu Swing SS handle Pintu tarik L = 30 cm SS Hollow 2x4 cm tbl 0.35 mm Hollow 4x4 cm tbl 0.35 mm
SAT
kg lbr bh bh m2 m3 m3 kg kg lbr kg kg kg kg kg kg kg 20kg/zak m' m' m' btg set bh bh psg psg m' bh bh bh bh lbr lbr lbr bh psg psg btg btg
HARGA SATUAN
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
-
41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87
Homogenous 30 x 60 cm Inbow doos jendela nako Jet Washer Toto Kabel NYM 3x2,5 mm² Kabel NYM 3x4 mm² kaca es t = 5 mm kaca polos 5 mm kaca polos 8 mm Kawat beton Kayu Kamper Samarinda oven balok Kayu Kamper Samarinda oven papan Kayu Meranti Palembang balok Kayu Meranti Palembang kaso Kayu Meranti Palembang papan Kayu kaso 5/7 Kayu klas II Kayu klas III Kayu Terentang balok Keramik Dinding 20 x 20 cm setara Masterina Keramik Dinding 20 x 25 cm Keramik Dinding 30 x 30 cm setara Masterina Keramik Lantai 20 x 20 cm Keramik Lantai 30 x 30 cm Keramik Lantai 33 x 33 cm kitchen zinc 1 lubzng, 1 sayap Klem conduit Kloset duduk CW 421 Toto lengkap Kloset jongkok CE-7 Toto Kotak kontak khusus (KKK) Kran Dinding - ex.Lokal Kran Panas-Dingin - ex.San Ei Kran Wastafel - ex.San Ei kuas kuas roll kunci tanam kunci pelor pintu Kusen Aluminium 4" Lampu barret Lampu Ring 18 watt - Phillips Lampu SL 18 watt - Phillips Lampu TL 2x18 watt Balk Lastdop Lem kayu MCB 10 A MCB box isi 4 Meni besi
bh bh daun bh m' m' m2 m2 m2 kg m3 m3 m3 m3 m3 m3 m3 m3 m3 bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh m' bh bh bh bh bh kg bh bh kg
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
-
88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134
Minyak begesting Minyak cat/ thinner Nok Gtg plentong kecil natural Outlet Box Metal Paku 2 s/d 5 cm Paku 5 s/d 7 cm Paku beton Paku peluru ramset Paku Sekrup 6x1-1,5 Pasir beton pasir pasang Pasir urug Pipa PVC dia 1/2" AW Pipa PVC dia 2" AW Pipa PVC dia 2" D Pipa PVC dia 3" AW Pipa PVC dia 3/4" AW Pipa PVC dia 4" AW Pipa PVC dia 4" D Plamir kayu Plamir tembok plywood 4 mm Rangka Jendela Aluminium Rangka Pintu aluminium Rumput Jepang Saklar ganda Broco Gracia Saklar tunggal Broco Gracia Seal tape Sekatan Urinoir semen portland Semen warna Seng gelombang 3"-5" Sloot Pintu SS Sock Stop Kontak Broco Tee dos Thinner (High Class) - ex. Cobra / setara Triplek Sungkai Super t = 3 mm Triplek 4x8 ft 9 mm Triplek 4x8 ft 12 mm Ubin keramik 20 x 20 cm Roman Urinoir U-57 Vinyl 30 x 30 cm Vinyl karet ( plint ) Wall sealer Dulux/ICI Wastafel Toto lengkap waterproofing aquaproof/setara
kg kg bh bh kg kg kg bh bh m3 m3 m3 m' m' m' m' m' m' m' kg kg lbr m' m' m2 bh bh bh bh kg kg lbr set bh bh bh kg lbr lbr lbr bh bh bh m' kg bh kg
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
-
B 1 2 3 4 5 6 7 8 9 10 11 12
HARGA UPAH Pekerja Tukang gali Tukang kayu Tukang batu Tukang besi Kepala tukang Tukang cat Tukang pasang pipa Tukang gypsum Tukang alumunium Instalator Mandor
Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
-
BILL OF QUANTITY (BQ) PROYEK JENIS PEKERJAAN LOKASI
NO
: Pembangunan IGD, ICU dan OK CITO Rumah Sakit Umum Kabupaten Tangerang : STRUKTURAL : Jl. Ahmad Yani No.9 Tangerang - Banten URAIAN PEKERJAAN
I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Pekerjaan Pondasi Mobilisasi dan demobilisasi alat pancang Biaya pemancangan, D = 6 m Hydrolic Tiang pancang mini pile 32x32 cm Pemotongan kepala tiang pancang Pile Cap Beton K-350, (PC-1) Pile Cap Beton K-350, (PC-2) Pile Cap Beton K-350, (PC-3) Pile Cap Beton K-350, (PC-4) Tapak Beton Teras Tapak Beton Tangga as A-B Tapak Beton Tangga RAM Sloof Beton 15/20 Sloof Beton 25/40 Sloof Beton 30/40 Pondasi Batu Kali Turap Batu Kali Pek. urugan pasir bawah pile cap, sloof & bt kali Lt Kerja ad. 1:3:5 t=5cm bawah pile cap & sloof Dinding Beton Lift Sub Total - I :
II 1 2 3 4 5 6 7 8 9 10 11 12 13
Pekerjaan Lantai 1 Kolom Beton K-1 40/60 Kolom Beton K-2 30/30 Kolom Beton K-3 11/11 Balok Beton TB 15/20 Balok Beton TB 15/25 Balok Beton TB 20/30 Balok Beton TB 25/35 Balok Beton TB 20/40 Balok Beton TG-1 25/50 Plat Lantai Beton t = 12 cm Tangga Beton Lt.1 ke Lt.2 Beton RAM Lt.1 ke Lt.2 Listplank Beton Void Tangga+Teras
VOL
SAT
Pekerjaan Lantai 2 Kolom Beton K-1 40/60 Kolom Beton K-3 11/11 Balok Beton TB 15/20 Balok Beton TB 15/25 Balok Beton TB 20/30 Balok Beton TB 25/35 Balok Beton TB 20/40 Balok Beton TG-1 25/50 Plat Lantai Beton t = 12 cm Tangga Beton Lt.2 ke Lt.3 Beton RAM Lt.2 ke Lt.3
JUMLAH HARGA
1.00 792.00 792.00 132.00 1.82 8.51 16.56 53.46 1.28 1.12 6.50 9.55 37.80 19.56 136.03 24.61 44.21 22.11 12.92
ls m' m' ttk m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3
-
43.20 4.46 8.60 11.28 1.56 0.45 2.10 18.76 44.50 101.46 3.25 23.86 5.66
m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3
-
Sub Total - II : III 1 2 3 4 5 6 7 8 9 10 11
HARGA SATUAN
38.40 6.40 8.07 2.01 0.45 2.10 12.24 39.75 79.20 2.78 22.93
m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3
-
NO 12
URAIAN PEKERJAAN Listplank Beton Void Tangga Sub Total - III :
VOL 0.68
SAT m3
HARGA SATUAN
JUMLAH HARGA -
NO
URAIAN PEKERJAAN
IV 1 2 3 4 5 6 7 8 9 10 11 12
Pekerjaan Lantai 3 Kolom Beton K-1 40/60 Kolom Beton K-3 11/11 Balok Beton TB 15/20 Balok Beton TB 15/25 Balok Beton TB 20/30 Balok Beton TB 25/35 Balok Beton TB 20/40 Balok Beton TG-1 25/50 Plat Lantai Beton t = 12 cm Tangga Beton Lt.3 ke Lt.4 ( 2 unit ) Listplank Beton Void Tangga Talang Beton
VOL
SAT
38.40 5.91 8.07 2.01 0.45 2.10 12.24 39.75 91.32 4.93 0.68 24.23
m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3
Sub Total - IV : V 1 2 3 4 5 6 7 8
Pekerjaan Lantai 4 Kolom Beton K-1 40/60 Kolom Beton K-3 11/11 Balok Beton TB 15/25 Balok Beton TB 20/40 Balok Beton TG-1 25/50 Plat Lantai Beton t = 12 cm Tangga Beton Lt.4 ke Lt.5 Listplank Beton Void Tangga
Pekerjaan Lantai Ruang Mesin Kolom Beton K-1 40/60 Kolom Beton K-2 30/30 Balok Beton TB 20/40 Plate Beton Mesin Lift t = 20 cm Sub Total - V :
JUMLAH HARGA
-
23.52 0.33 1.56 8.80 37.50 6.30 2.78 0.68
m3 m3 m3 m3 m3 m3 m3 m3
Sub Total - IV : VI 1 2 3 4
HARGA SATUAN
-
6.62 2.16 1.80 4.20
m3 m3 m3 m3
-
BILL OF QUANTITY (BQ)
PROYEK
: Pembangunan IGD, ICU dan OK CITO Rumah Sakit Umum Kabupaten Tangerang
LOKASI
: Jl. Ahmad Yani No.9 - TANGERANG
PEKERJAAN
: TATA UDARA
NO
Qty
SAT
2.0
unit
Rp
-
Unit Fan Coil Unit ( FCU ) Merk : York Model / Type : Duct Split Kapasitas / TR : 10 TR Unit Fan Coil Unit ( FCU ) Merk : York Model / Type : Duct Split Kapasitas / TR : 8,3 TR Unit Fan Coil Unit ( FCU ) Merk : York Model / Type : Duct Split Kapasitas / TR : 5 TR Unit Fan Coil Unit ( FCU ) Merk : York Model / Type : Duct Split Kapasitas / TR : 4,16 TR Unit Fan Coil Unit ( FCU ) Merk : York Model / Type : Duct Split Kapasitas / TR : 2 TR Air Conditioning Merk : York Model / Type : Duct Split Kapasitas / TR : 4,16 TR
9.0
unit
Rp
-
4.0
unit
Rp
-
1.0
unit
Rp
-
2.0
unit
Rp
-
3.0
unit
Rp
-
1.0
unit
Rp
-
3
POMPA Merk : Torishima / Ebara Model / Type : Horisontal and Suction Kapasitas / Gpm : 400 Gpm
2.0
bh
Rp
-
4
Pekerjaan pemipaan & Aksessories
1.0
lot
Rp
-
5
Pekerjaan Ducting AC & Aksessories
1.0
lot
Rp
-
6
Pekerjaan Fresh Air & Exhaust
1.0
lot
Rp
-
7
Transportasi & Akomodasi
1.0
lot
Rp
-
8
Pekerjaan Finishing
1.0
lot
Rp
-
9
Pekerjaan testing & Commisioning
1.0
lot
Rp
-
Rp
-
I 1
2.a
b
c
d
d
e
URAIAN PEKERJAAN PEKERJAAN AIR CONDITIONING PERALATAN UTAMA Air Conditioning Merk : York Model / Type : Air Colled Chiller Kapasitas / TR : 165 TR
Rp.
HARGA SATUAN
JUMLAH
BILL OF QUANTITY (BQ) PROYEK LOKASI PEKERJAAN NO 1
: Pembangunan IGD, ICU dan OK CITO Rumah Sakit Umum Kabupaten Tangeran : Jl. Ahmad Yani No.9 - TANGERANG : ELEVATOR URAIAN PEKERJAAN
LIFT ( PASSENGER ELEVATOR ) Clear Hoistway 2100 x 2150 mm Load 900 - 1000 kg - Sistem Nudging & Buzzer
Qty
SAT
HARGA SATUAN
JUMLAH
1.0
Unit
-
1.0
Unit
-
- Sistem By Pass ( Automatic Bypass & Overload Non-Start ) -
Safety Shoe - Ultrasonic Sensor Interphone & Electric Chime Automatic Rescue Device (ARD/optional) Light & Fan Automatic Shuf Off Variable Voltage Variable Frequency Inverter Drive Inverter Voltage & Frequency
- Distribution Board Complete with Lighting sw. & Receptacle Interior Specification : - Celling : Smooth Shape - Lighting : Flash Concealed Lighting - Transom : Hairline Stainless Steel - Front Wall : Hairline Stainless Steel - Enclosure : Etched Stainless Steel - Door Panel : Etched Stainless steel - Floor : Vinyl - Skirting : Hairline Stainless Steel 2
LIFT ( BED ELEVATOR ) Clear Hoistway 2050 x 2900 mm - Sistem Nudging & Buzzer - Sistem By Pass ( Automatic Bypass & Overload Non-Start ) - Safety Shoe - Ultrasonic Sensor - Interphone & Electric Chime - Automatic Rescue Device (ARD/optional) - Light & Fan Automatic Shuf Off - Variable Voltage Variable Frequency - Inverter Drive - Inverter Voltage & Frequency - Distribution Board Complete with Lighting Interior Specification : - Celling : Smooth Shape - Lighting : Flash Concealed Lighting - Transom : Hairline Stainless Steel - Front Wall : Hairline Stainless Steel - Enclosure : Etched Stainless Steel - Door Panel : Etched Stainless steel - Floor : Vinyl - Skirting : Hairline Stainless Steel TOTAL :
Rp
-