PEMBANGUNAN KESEHATAN
RUMAH SAKIT UMUM BAHTERAMAS PROVINSI SULAWESI TENGGARA
PEMBANGUNAN BIDANG KESEHATAN DILAKUKAN MELALUI :
PELAYANAN KESEHATAN GRATIS
PENINGKATAN KUALITAS DAN KUANTITAS TENAGA KESEHATAN
PENINGKATAN FASILITAS KESEHATAN
MENGATASI GIZI BURUK
PELAYANAN KESEHATAN IBU DAN ANAK
ANGGARAN BIDANG KESEHATAN TOTAL ANGGARAN PEMBANGUNAN BIDANG KESEHATAN PROVINSI SULAWESI DALAM KURUN WAKTU ENAM TAHUN (KURUN WAKTU TAHUN 2008 – 2013 SEBESAR RP. 518.992.053.000,BERSUMBER DARI APBD, APBN DAN BANTUAN LUAR NEGERI. JUMLAH ANGGARAN KESEHATAN TAHUN 2008-2013 (Rp. 000,-) NO 1
SUMBER DANA DANA APBD (BELANJA LANGSUNG)
2 DANA DEKONSENTRASI
2008 10,850,521
2009
2011
2012
2013
JUMLAH
7,230,756
4,103,623
1,990,000
2,058,600
4,037,300
30,270,800
7,678,278 14,245,743
12,802,333
2,647,612
20,871,.685
23,452,438
81,698,089
58,828,579
71,240,417
71.240,417
67.330.958 348,638.015
1,944,171
7,700,475
7,902,263
5,691,050
82,148,016 69,609,268
83,435,010
93.780.292
3
DANA BANSOS JAMKESMAS
33,809,046 46,188,598
4
DANA BANTUAN LUAR NEGERI
29,810,171
J U M LAH
2010
5,337,019
58,385,149
99,861,752 100,157,711 518,992,053
DERAJAT KESEHATAN TAHUN 2008 – 2013 UMUR HARAPAN HIDUP DARI 67,2 TAHUN PADA TAHUN 2008 MENJADI 71,8 TAHUN PADA TAHUN 2012 (DATA PROYEKSI BPS) KEMATIAN IBU DARI 92 KASUS PADA TAHUN 2008 MENJADI 74 KASUS PADA TAHUN 2012 JUMLAH KEMATIAN BAYI+Neonatal MENURUN DARI 518 KASUS TAHUN 2008 KASUS MENJADI 417 KASUS PADA TAHUN 2012
KASUS GIZI BURUK TURUNKAN DARI 1.137 KASUS PADA TAHUN 2008 MENJADI 333 KASUS PADA TAHUN 2013
JUMLAH TENAGA KESEHATAN TAHUN 2008-2013 NO
JENIS TENAGA
1
JUMLAH TENAGA DOKTER SPESIALIS
2
JUMLAH TENAGA DOKTER UMUM
3
JUMLAH TENAGA DOKTER GIGI
4
JUMLAH TENAGA PERAWAT DAN BIDAN
TAHUN 2008
2009
2010
2011
2012
2013
51
50
60
70
89
97
300
299
352
414
445
448
78
77
85
131
98
179
4.283
4.252
4.259
4.215
6.324
6.462
KEADAAN TENAGA KESEHATAN TAHUN 2007 - 2013 DOKTER SPESIALIS BERTAMBAH DARI 51 ORANG TAHUN 2008 MENJADI 97 ORANG PADA TAHUN 2013 DOKTER UMUM BERTAMBAH DARI 300 ORANG PADA TAHUN 2008 MENJADI 448 ORANG PADA TAHUN 2013 DOKTER GIGI BERTAMBAH DARI 78 ORANG PADA TAHUN 2008 MENJADI 179 ORANG PADA TAHUN 2013 PERAWAT DAN BIDAN BERTAMBAH DARI 4.283 ORANG PADA TAHUN 2008 MENJADI 6.462 ORANG PADA TAHUN 2013.
PENINGKATAN FASILITAS PELAYANAN KESEHATAN No 1 2 3 5 6 7 8 9 10
JENIS SARANA PELAYANAN RUMAH SAKIT UMUM (Pemerintah + Swasta) RUMAH SAKIT JIWA RUMAH SAKIT BERSALIN PUSKESMAS PERAWATAN PUSKESMAS NON PERAWATAN PUSKESMAS KELILING PUSKESMAS PEMBANTU POLINDES dan POSKESDES POSYANDU
2008
2009
2010
2011
2012
2013
20
20
16
21
21
23
1 6 66 141 129 589 414 2,701
1 7 66 157 437 410 755 2,822
1 9 68 172 107 558 902 2,876
1 16 71 177 205 437 986 2869
1 16 77 175 232 428 992 2990
1 16 79 185 283 480 956 3008
FASILITAS PELAYANAN KESEHATAN RUMAH SAKIT UMUM BERTAMBAH DARI 20 UNIT PADA TAHUN 2008 MENJADI MENJADI 23 UNIT PADA TAHUN 2013 RUMAH BERSALIN BERTAMBAN DARI 6 UNIT PADA TAHUN 2008 MENJADI 16 UNIT PADA TAHUN 2013 PUSKESMAS PERAWATAN BERTAMBAH DARI 63 UNIT PADA TAHUN 2008 MENJADI 79 UNIT PADA TAHUN 2013.
PUSKESMAS NON PERAWATAN BERTAMBAH DARI 144 UNIT PADA TAHUN 2008 MENJADI 185 UNIT PADA TAHUN 2013 PUSKESMAS KELILING BERTAMBAH DARI 129 UNIT PADA TAHUN 2008 MENJADI 283 UNIT PADA TAHUN 2013 POLINDES DAN POKESDES BERTAMBAH DARI 536 UNIT PADA TAHUN 2008 MENJADI 956 UNIT PADA TAHUN 2013 POSYANDU BERTAMBAH DARI 2.241 UNIT PADA TAHUN 2008 MENJADI 3008 UNIT PADA TAHUN 2013
RSU BAUBAU – KOTA BAUBAU
PELAKSANAAN PROGRAM PERBAIKAN GIZI URAIAN JUMLAH KASUS GIZI BURUK PERSENTASE KASUS GIZI BURUK YANG MENDAPAT PERAWATAN (%) PERSENTASE BALITA YANG DITIMBANG (D/S) (%) PENINGKATAN KAPASITAS TENAGA (ORG) RESPON CEPAT KASUS GIZI BURUK (LOKASI) PENGEMBANGAN RUMAH PEMULIHAN GIZI BERBASIS MASYARAKAT (UNIT)
2008 1137
2009 1246
2010 938
2011 508
2012 327
2013 333
100
100
100
100
100
100
48.7
45.9
66.7
70.31
67,4
70,3
48
0
0
94
96
241
72
72
60
50
60
60
6
12
24
JUMLAH ANGGARAN (RP. 000)
833.42
813.701
2.092.009
2.687.724
932.225
1.350.000
KASUS GIZI BURUK DITURUNKAN DARI 1.137 KASUS PADA TAHUN 2008 MENJADI 333 KASUS PADA TAHUN 2013
PELAKSANAAN PROGRAM KESEHATAN IBU INDIKATOR JUMLAH ANGGARAN (RP. 000)
TAHUN 2008
2009
2010
2011
2012
2013
935.015
3.099.800
2.612.100
900.000
2.06.500
2.214.750
JUMLAH BIDAN DI DESA YANG DITEMPATKAN
158
244
345
768
1212
1.411
JUMLAH DOKTER PTT YANG DITEMPATKAN
201
176
206
240
236
236
12
10
29
44
44
44
2
3
5
7
7
7
112
228
203
112
240
625
CAKUPAN K4 (%)
75.06
84.32
85.87
90
80,21
76,69
PERSALINAN NAKES (%)
75.96
80.35
86.28
89.21
79,8
90,06
JUMLAH PUSK PELAYANAN OBSTETERI NEONATAL EMERGENCY DASAR) JUMLAH RS PONEK JUMLAH TENAGA YANG DILATIH (ORG)
CAKUPAN CPR (%)
63.83
67.03
67.60
68.01
71,58
55,26
UPAYA PENINGKATAN KESEHATAN IBU DILAKUKAN MELALUI : PENEMPATAN BIDAN DI DESA SAMPAI DENGAN TAHUN 2013 SEBANYAK 1.411 ORANG
PENEMPATAN DOKTER PTT SAMPAI DENGAN TAHUN 2013 236 ORANG JUMLAH PUSKESMAS PELAYANAN OBSRTERI NEONATAL EMERGENCY DASAR 44 PUSKESMAS JUMLAH RUMAH SAKIT PONEK 7 UNIT TENAGA TERLATIH 1520 ORANG
PELAKSANAAN PROGRAM KESEHATAN ANAK TAHUN 2007 - 2013 INDIKATOR JUMLAH ANGGARAN (RP. 000) JUMLAH TENAGA YANG DILATIH (ORG) KN LENGKAP (%) PENANGANAN KN KOMPLIKASI (%) KUNJUNGAN BAYI (%) YANKES BALITA (%)
2008 2009 54,554 1,841,271
TAHUN 2010 2011 2012 2013 1,941,271 813,701 1,855,988 1,985,998
120
332
324
70
444
542
77.89 69.32 74.31 62.45
83.71 34.52 73.17 47.8
83.91 58.05 85.62 67
90.52 65.26 86,09 71.61
95,01 67 89,26 54,71
73,5 68,5 89,54 55,89
PROGRAM KESEHATAN ANAK TAHUN 2008 – 2013. TENAGA YANG DILATIH HINGGA TAHUN 2013 MENCAPAI 1.832 ORANG KUNJUNGAN BAYI MENCAPAI 89,54%
PENGEMBANGAN SDM KESEHATAN TAHUN
NO.
JENIS PENDIDIKAN
1
ANGGARAN (RP. 000)
2
DOKTER SPESIALIS
14
14
3
S2
29
4
S1
5 6
2012
2013
8,390,948
2.957.000
1.895.700
14
14
14
9
34
34
34
-
-
29
32
42
42
4
4
D IV
4
4
23
23
6
6
D III
40
49
89
180
91
91
102
119
188
279
115
110
TOTAL
2008
2009
2010
6,551,278
6,928,338
2011
8,053,448
TENAGA KESEHATAN YANG MENDAPAT BANTUAN HINGGA TAHUN 2013 SEBANYAK 913 ORANG TOTAL ANGGARAN YANG DISEDIAKAN DALAM TAHUN 2008 – 2013 SEBESAR RP. 34.776.712.000,-
BANTUAN KEUANGAN KEPADA DESA, KELURAHAN DAN KECAMATAN
BANTUAN KEUANGAN KEPADA DESA, KELURAHAN DAN KECAMATAN (BLOCK GRANT) NO. 1. 2. 3. 4. 5.
TAHUN 2008 2009 2010 2011 2012
PENYERAPAN DANA (RP) 82.080.000.000 52.825.000.000 111.350. 000.000 177.105.000.000 172.450.000.000
JUMLAH
% 92,50 26,42 55,64 89,45 86,13
595.810.000.000
DALAM KURUN WAKTU PEMERINTAH PROVINSI SULAWESI TENGGARA TELAH MENGANGGARKAN DANA BLOCK GRANT SEBESAR RP. 595.810.000.000,DENGAN BEBERAPA KEGIATAN YANG BERHASIL DIBANGUN YAITU : PEMBANGUNAN KANTOR DESA KELURAHAN SE SULAWESI TENGGARA MODAL USAHA EKONOMIS PRODUKTIF PEMBANGUNAN INFRASTRUKTUR DESA/KELURAHAN
DI
PENYERAHAN BLOCK GRANT OLEH GUBERNUR SULAWESI TENGGARA
BANK PERKREDITAN RAKYAT (BPR) BAHTERAMAS •
BPR BAHTERAMAS ADALAH MERUPAKAN TEROBOSAN YANG DILAKUKAN OLEH PEMERINTAH PROVINSI UNTUK MEMBERIKAN KEMUDAHAN KEPADA PETANI, NELAYAN DAN MASYARAKAT DESA DALAM MENGAKSES MODAL KERJA KURANG DARI RP. 10 JUTA.
•
BPR BAHTERAMAS ADALAH MERUPAKAN TEROBOSAN YANG DIAKUI OLEH BANK INDONESIA KARENA PEMEGANG SAHAMNYA ADALAH PARA KEPALA DESA DAN DIBANGUN SECARA SERENTAK DI SELURUH KABUPATEN/KOTA DALAM WILAYAH PROVINSI.
•
POSISI PENDAPATAN SAMPAI DESEMBER 2013 RP. 10.789.798.328
•
JUMLAH ASET SAMPAI DESEMBER 2013 RP. 56,859 MILYAR
•
TOTAL KREDIT YANG DISALURKAN PADA TAHUN 2013 RP. 40.485.579.501
•
TOTAL NASABAH PADA TAHUN 2013 6.711 ORANG
45
REVITALISASI PEMERINTAHAN
PENYELENGGARAAN PEMERINTAHAN MENGGUNAKAN : • PRINSIP-PRINSIP MANAJEMEN MODEREN
• PRINSIP – PRINSIP GOOD GOVERNANCE • PRINSIP-PRINSIP CORPORATE GOVERNANCE • KREASI, INOVASI DAN KEBERANIAN
PEMERINTAH PROVINSI SULAWESI TENGGARA TERUS MENINGKATKAN KUALITAS PERENCANAAN DAN PENGANGGARAN UNTUK PENINGKATAN KESEJAHTERAAN MASYARAKAT.
LAYANAN PENGADAAN SECARA ELEKTRONIK (LPSE) MENJAMIN TRANSPARANSI DAN MENCIPTAKAN AKUNTABILTAS DAN EFISIENSI INVESTASI LPSE RP. 823.680.000,
SEBESAR
PADA TAHUN 2013 SEBANYAK 18 SKPD TELAH MELAKUKAN PENGUMUMAN LELANG MELALUI LPSE TERDIRI DARI 356 PAKET DENGAN TOTAL ANGGARAN RP. 493.929.041.635. EFISIENSI LELANG PAKET-PAKET PEKERJAAN TERSEBUT MENCAPAI RP. 11.491.887.23 PADA TAHUN 2014 SELURUH SKPD TELAH MENYAMPAIKAN RUP TOTAL 4.191 PAKET, DENGAN ANGGARAN RP. 739.869.416.983 TAHUN 2014 PELELANGAN SEPENUHNYA DILAKUKAN PADA BIRO LAYANAN PENGADAAN SETDA PROVINSI SULAWESI TENGGARA
PELUNCURAN BIRO LAYANAN PENGADAAN SETDA PROVINSI SULAWESI TENGGARA TANGGAL 3 FEBRUARI 2014
PEMBENTUKAN BIRO LAYANAN PENGADAAN PERTAMA DI INDONESIA
ANGGARAN PENDAPATAN DAN BELANJA DAERAH (APBD) TAHUN ANGGARAN 2007-2013 PEMERINTAH PROV. SULTRA APBD T.A 2007 RP. 759.061.059.090 APBD T.A 2013 RP. 2.176.892.463.186,87 PENINGKATAN APBD PROVINSI SULAWESI TENGGARA TAHUN 2008 – 2013 SEBESAR RP. 1.417.831.404.097.- ATAU TERJADI PERTAMBAHAN SEBESAR 286 %
2007
2008
2009
2010
2011
2012
2013
BELANJA TIDAK LANGSUNG
287.754.917.288
475.991.280.580
586.596.933.949
629.489.866.289
768.634.977.109 1.263.318.613.706,47 1.204.401.909.158,87
BELANJA LANGSUNG
471.306.141.802
601.463.007.946
773.940.254.621
691.087.222.390
799.188.949.214
TOTAL (Rp)
759.061.059.090 1.077.454.288.526 1.360.537.188.570 1.320.577.088.679 1.567.823.926.323 2.056.564.248.649,47 2.176.892.463.186,87
793.245.634.943
972.490.554.028
PERKEMBANGAN DARI HASIL PEMERIKSAAN BPK-RI PERWAKILAN PROV. SULTRA TERHADAP LKPD PROV. SULTRA SEJAK TAHUN 2008-2013 TAHUN ANGGARAN 2008 2009 2010 2011 2012
NO. LAPORAN HASIL PEMERIKSAAN /TANGGAL
O P I N I
DISCLAIMER OF OPINION DISCLAIMER OF 23.A/HP/XIX/KDR/06/2010, TANGGAL 19 JUNI 2010 OPINION WAJAR DENGAN 20.A/LHP/XIX.KDR/06/2011, TANGGAL 7 JUNI 2011 PENGECUALIAN WAJAR DENGAN 16.A/LHP/XIX.KDR/05/2012 PENGECUALIAN WAJAR DENGAN 04.C/LHP/XIX.KDR/O4/2013 PENGECUALIAN 29.A/HP/XIX/KDR/07/2009, TANGGAL 31 JULI 2009
UPAYA PENINGKATAN OPINI BPK DARI DISCLAIMER MENJADI WAJAR DENGAN PENGECUALIAAN (WDP) DILAKUKAN MELALUI : SENSUS ASET PENYUSUNAN RENCANA TINDAK-LANJUT
PENEGAKKAN & KEPASTIAN HUKUM TOTAL PRODUK HUKUM YANG DIHASILKAN SELAMA KURUN WAKTU TAHUN
2008 – 2013 ADALAH SEBANYAK 5.144 KEPUTUSAN YANG
MELIPUTI : 64 PERATURAN DAERAH 414 PERATURAN GUBERNUR 4.439 SURAT KEPUTUSAN DAN 227 MEMORANDUM OF UNDERSTANDING SEJAK TAHUN
2008 HINGGA TAHUN
2013, TELAH
BERHASIL
DISELESAIKAN 35 KASUS YANG TERKATUNG-KATUNG LEBIH DARI 25 TAHUN, TERMASUK LAHAN ASET PEMERINTAH PROVINSI
PEMBANGUNAN KAWASAN KANTOR GUBERNUR PEMBANGUNAN INFRASTRUKTUR SEKTRETARIAT DAERAH NO
URAIAN
1 PEMBANGUNAN RUJAB WAGUB SULTRA (FINISHING) 2 PEMBANGUNAN GEDUNG III KTR. GUBERNUR SULTRA 3 PEMBANGUNAN GAZEBO DAN TAMAN KTR. GUBERNUR 4 PEMBANGUNAN GEDUNG GUEST HOUSE 5 PEMBANGUNAN GEDUNG POL PP 6 REHAB RUANG POLA KANTOR GUBERNUR SULTRA 7
PENGADAAN DAN PEMBANGUNAN GEDUNG SENTRAL PLTD KANTOR GUBERNUR
8 PENGADAAN INFRASTRUKTUR JARINGAN PENDUKUNG SIPKD 9 REHAB RUANG KERJA SEKDA 10 PEMASANGAN ALKOPAN KANTOR INDUK 11 PEMBANGUNAN MESJID RAYA NURUSSHALIHIN 12
PENGADAAN PENDINGIN RUANGAN GEDUNG III KANTOR GUBERNUR
13 PEMASANGAN INSTALASI LISTRIK, TAMAN DAN GAZEBO 14 PENYELESAIAN GEDUNG III 15 PEMASANGAN PLAFON GRC GEDUNG INDUK (LUAR) 16 INTERIOR RUANG KERJA SEKDA PROV. SULTRA
RAPAT KOORDINASI PARA BUPATI DAN WALIKOTA DI KANTOR PENGHUBUNGAN MENARA GLOBAL JAKARTA
RAPAT DENGAN PENDAPAT ANTARA KOMISI II DPR R.I DENGAN MENTERI DALAM NEGERI DAN GUBERNUR SULAWESI TENGGARA SERTA BUPATI BUTON, BUPATI MUNA DAN WALIKOTA BAUBAU DALAM RANGKA PEMBENTUKAN DOB
SEMINAR NASIONAL REFORMASI BIROKRASI DI SULAWESI TENGGARA, TANGGAL 11 OKTOBER 2012
PENGEMBANGAN KOMPETENSI PEGAWAI DILAKUKAN MELALUI :
DIKLAT PIM ; PRAJABATAN GOL II, III, IV : 3.840 ORANG (BELUM MASUK TAHUN 2012)
DIKLAT TEKNIS FUNGSIONAL 260 ORANG (BELUM MASUK TAHUN 2012)
SERTIFIKASI LEMBAGA PENGADAAN SECARA ELEKTRONIK 198 ORANG ( BELUM MASUK TAHUN 2012)
SERTIFIKASI PELAYANAN TERPADU 30 ORANG
SELEKSI PENYETARAAN IJAZAH 500 ORANG
SELEKSI UJIAN DINAS TK I DAN TK II 450 ORANG
PENATAAN SISTEM ADMINISTRASI KENAIKAN PANGKAT PNS 6000 ORANG
SELEKSI PENERIMAAN CALON PNS KATEGORI II 500 ORANG
PENATAAN SISTEM ADMINISTRASI KENAIKAN PENSIUN 272 ORANG
PENGHARGAAN BIROKRAT PROFESIONAL MEMBERIKAN PENGHARGAAN
KATEGORI
PENGHARGAAN BIROKRAT INOVATIF 2012