KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL
PENGUMUMAN PEMENANG LELANG PENAWARAN LANGSUNG WILAYAH KERJA MIGAS TAHAP II TAHUN 2010 DAN LELANG PENAWARAN LANGSUNG WILAYAH KERJA GAS METANA BATUBARA TAHUN 2010
DIREKTORAT JENDERAL MINYAK DAN GAS BUMI Jakarta, 18 Maret 2011
PENGUMUMAN PEMENANG LELANG PENAWARAN LANGSUNG WILAYAH KERJA MIGAS TAHAP II TAHUN 2010
TATA WAKTU LELANG PENAWARAN LANGSUNG TAHAP II TAHUN 2010 PENGAMBILAN DOKUMEN LELANG
: 10 DESEMBER 2010 - 7 FEBRUARI 2011
PEMASUKAN DOKUMEN PARTISIPASI : 9 FEBRUARI 2011 PENGUMUMAN PEMENANG
: 18 MARET 2011
PENAWARAN WILAYAH KERJA MIGAS TAHAP II TAHUN 2010
TABEL T & C WILAYAH KERJA PENAWARAN LANGSUNG (DIRECT PROPOSAL)
GOVERNMENT TAKE (%) BLOCK
LOCATION
FTP 1) AFTER TAX
1
GURITA
Kepri
2
SEMBILANG
Kepri
3
MARQUISA
Sumut
4
SOUTH BETUNG
5
CONTRACTOR TAKE (%)
20% 20% 20%
AFTER TAX
MINIMUM BONUS US$
MNIMUM KOMITMEN PASTI
OIL
GAS
OIL
GAS
65
60
35
40
1,500,000
Seismik 3D
75
65
25
35
1,000,000
Re-opening Well
75
60
25
40
1,000,000
Seismik + 1 Well Seismik + 1 Well
Jambi-Sumsel
20%
70
60
30
40
1,000,000
SUMBAGSEL
Sumsel
20%
75
60
25
40
1,000,000
6
ARAFURA SEA II
Maluku
20%
65
60
35
40
1,000,000
7
INDRAGIRI HILIR
Riau
20%
65
60
35
40
Note : 1)
FTP 20 % is shared for Government and Contractor based on split
1,000,000
Seismik + 1 Well
Seismik + 1 Well (tahun ke-4)
Seismik + 1 Well
PEMBELIAN DOKUMEN LELANG & PESERTA LELANG
NO
BLOK
PERUSAHAAN PEMBELI DOKUMEN
PESERTA LELANG
1
GURITA
1
1
2
MARQUISA
1
1
3
SOUTH BETUNG
1
1
4
SUMBAGSEL
2
1
5
ARAFURA SEA II
3
TIDAK ADA
6
INDRAGIRI HILIR
TIDAK ADA
TIDAK ADA
7
SEMBILANG
1
1
9
5
JUMLAH
SOP EVALUASI DOKUMEN EVALUASI ADMINISTRASI
• Kelengkapan Dokumen sesuai persyaratan
(Lengkap/ Tidak Lengkap)
EVALUASI TEKNIS (Memenuhi/Tidak memenuhi)
EVALUASI KEUANGAN (Memenuhi/Tidak memenuhi)
EVALUASI KINERJA:
• interpretasi data harus memenuhi kaidah keteknikan • Identifikasi lead/prospect berdasarkan data yang mendukung • Komitmen sumur dan seismik harus didukung oleh hasil identifikasi prospect/lead serta resources • Strategi eksplorasi yang efektif dan beralasan (kesesuaian antara rencana kerja, target serta biaya) • Usulan Komitmen yang tidak rasional dianggap tidak valid • Kemampuan keuangan untuk mendukung rencana kerja komitmen pasti 3 tahun pertama masa eksplorasi / 2 tahun pertama produksi • Track Record perusahaan
PEMENANG LELANG NAMA BLOK 1.
GURITA
Komitmen Eksplorasi 3 Tahun Pertama G&G Seismik 2D Sesimik 3D Sumur Total
PEMENANG LELANG NATUNA VENTURES B.V
Volume
US$ 500.000
400 km2
4.600.000
Signature Bonus : US$ 1.500.000
5.100.000
PEMENANG LELANG NAMA BLOK 2.
PEMENANG LELANG
MARQUISA
Komitmen Eksplorasi 3 Tahun Pertama G&G Seismik 2D Sesimik 3D Sumur Total Komitmen
PT SCHINTAR
Volume 200 km 1 sumur
Signature Bonus : US$ 1.000.000
US$ 500.000 2.000.000 3.000.000 5.500.000
PEMENANG LELANG NAMA BLOK 3.
PEMENANG LELANG
SOUTH BETUNG
Komitmen Eksplorasi 3 Tahun Pertama G&G Seismik 2D Sesimik 3D Sumur Total Komitmen
TECHWIN ENERGY LTD
Volume 200 km 1 sumur
Signature Bonus : US$ 1.000.000
US$ 600.000 2.000.000 3.500.000 6.100.000
PEMENANG LELANG
4.
NAMA BLOK
PEMENANG LELANG
SUMBAGSEL
COOPER ENERGY LTD
Komitmen Eksplorasi 3 Tahun Pertama Volume G&G Seismik 2D 1000 km Sesimik 3D Sumur 1 sumur Total Komitmen
Signature Bonus : US$ 1.000.000
US$ 300.000 3.500.000
2.100.000 5.900.000
PEMENANG LELANG NAMA BLOK 5.
SEMBILANG
Komitmen G&G Surface Facility Study Detail Design Surface Facility Re-Activation Wells Total Komitmen Pasti
PEMENANG LELANG PT MANDIRI PANCA USAHA
Volume
US$ 700.000 200.000
4 sumur
Signature Bonus : US$ 1.100.000
Signature Bonus : US$ 1.100.000
300.000 2.600.000 3.800.000
TOTAL SELURUH KOMITMEN
A. KOMITMEN PASTI 4 BLOK ( Gurita, Marquisa, Sumbagsel dan South Betung) Komitmen Volume US$ Sign Bonus 4.500.000 G&G 1.900.000 Seismik 2D 1400 km 7.500.000 Sesimik 3D 400 km2 4.600.000 Sumur 3 sumur 8.600.000 Total Komitmen Pasti 3 tahun pertama 22.600.000 Bonus Total Komitmen (US$) (US$) B.KOMITMEN PASTI Blok Sembilang Komitmen Volume Sign Bonus G&G Surface Facility Study Detail Design Surface Facility Re -activation wells 4 sumur Total Komitmen Pasti 2 tahun pertama
5.600.000 26.400.000 US$ 1.100.000 700.000 200.000 300.000 2.600.000 3.800.000
PAPARAN LELANG PENAWARAN LANGSUNG PEMENANG WILAYAHPENGUMUMAN KERJA GAS METANA BATUBARA TAHUN 2010
LELANG PENAWARAN LANGSUNG WILAYAH KERJA GAS METANA BATUBARA TAHUN 2010 - 2011
TERMS AND CONDITIONS PENAWARAN LANGSUNG WK GMB TAHUN 2010-2011 WORKING AREA
TERMS AND CONDITIONS Contractor Government Take (%) take (%)
Relinquishment No
1.
GMB Sijunjung
1,305
PSC
15
Remaining Area 6 Year* (%) 70
2.
GMB Kutai Timur
1,496
PSC
15
70
25
10
60
40
100%
3.
GMB Kutai Barat
1,699
PSC
20
60
25
10
60
40
100%
4.
GMB Kapuas I
1,102
PSC
10
80
25
10
55
40
100%
5.
GMB Kapuas II
1,108
PSC
10
80
25
10
55
45
100%
6.
GMB Kapuas III
977.7
PSC
10
80
25
10
55
45
100%
Blocks
Size (Km2)
Contract Model
First 3 Year (%)
DMO** * (%)
25
FTP** (%)
Cost Recovery****
Minimum Firm Commitment
G&G Study 2 corehole, 2 exploration well G&G Study 2 corehole, 2 exploration well G&G Study 2 corehole, 2 exploration well G&G Studi, 3 Corehole, 1 exploration well G&G Studi, 3 Corehole, 1 exploration well G&G Studi, 2 Corehole, 1 exploration well
After Tax Gas
After Tax Gas
10
55
45
100%
Minimum Signature Bonuss (US$)
Offering Mechanism
1,000,000
Direct Proposal Tender
2,000,000
Direct Proposal Tender
2,000,000
Direct Proposal Tender
1,000,000
Direct Proposal Tender
1,000,000
Direct Proposal Tender
1,000,000
Direct Proposal Tender
Information : * If the area of CBM found more than 80% from the total of the Original Working Area, then size of the remaining Working Area can be maintained up to 90% If the area of CBM found more than 70% from the total of the Original Working Area, then size of the remaining Working Area can be maintained up to 85% If the area of CBM found more than 60% from the total of the Original Working Area, then size of the remaining Working Area can be maintained up to 80% ** FTP 10% for Government and undivided with Contractor *** DMO since commercial production with domestic market prices ****Cost Recovery 100% from Annual Gross Revenue Generally applicable provisions in the Production Sharing Contract which will be applied to the Work Area : •Contract Period of 30 Years •Contractor are required to pay a signature bonus, production bonus and the bonus support equipment / services to the Government and the payment can not be charged as operating costs in the PSC. •Contractor are required to offer the 10% Participating Interest since POD I is approved by the Government to the Local Government Owned Company (LGOC) or private companies if LGOC are not interested.
TATA WAKTU LELANG PENAWARAN LANGSUNG WILAYAH KERJA GAS METANA BATUBARA TAHUN 2010-2011
• • • • •
AKSES BID DOCUMEN FORUM KLARIFIKASI PEMASUKAN DOCUMEN PARTISIPASI EVALUASI DAN PENILAIAN PENGUMUMAN PEMENANG
: 10 JANUARI,2011 - 23 FEBRUARI 011 : 14 PEBRUARI 2011 – 22 FEBRUARI 2011 : 24 PEBRUARI 2011, PUKUL : 09.30– 14.30 WIB : 3 - 11 MARET 2011 : 18 MARET 2011
PETA LELANG PENAWARAN LANGSUNG WILAYAH KERJA GMB AHUN 2010-2011
PESERTA LELANG PENAWARAN LANGSUNG WK GMB TAHUN 2010-2011
No
1
2
3
4
5
6
NAMA BLOK
PERUSAHAAN PELAKSANA STUDI AKSES BID DOCUMEN BERSAMA
MENYERAHKAN DOKUMEN PARTISIPASI
GMB Kapuas I
1. BP Exploration Indonesia PT TransAsia Resources Ltd. 2. PT. TransAsia Resources
1. Konsorsium PT. TransAsia Resources – BP Exploration Indonesia Ltd.
GMB Kapuas II
1. BP Exploration Indonesia PT TransAsia Resources Ltd. 2. PT. TransAsia Resources
1. Konsorsium PT. TransAsia Resources – BP Exploration Indonesia Ltd.
GMB Kapuas III
1. BP Exploration Indonesia PT TransAsia Resources Ltd. 2. PT. TransAsia Resources
1. Konsorsium PT. TransAsia Resources – BP Exploration Indonesia Ltd.
GMB Kutai Timur
GMB Kutai Barat
Konsorsium Ephindo 1. Konsorsium Senyiur CBM Inc. – Ilthabi CBM Holding Inc.- 1. Total E&P Indonesie Total E&P Kutai Timur Total E&P Indonesie 2. Ephindo Ilthabi CBM Holding Inc. Konsorsium PT. Sugico Graha - Exxon Mobile
1. PT. Sugico Graha
1. PT. Sugico Graha
2. Total E&P Indonesie
GMB Sijunjung
Konsorsium PT. Lion 1. PT. Lion Global Energi Global Energi - PT. Bukit 2. PT. Bukit Asam (Persero) Asam (Persero) Tbk. Tbk.
1. Konsorsium PT. Lion Global Energi – PT. Bukit Asam (Persero) Tbk.
KRITERIA PENILAIAN • Kriteria penilaian oleh Tim adalah sebagai berikut : – – – – – –
Pembukaan dokumen partisipasi dan evaluasi kelengkapan administrasi Evaluasi dan penilaian dokumen teknis Evaluasi dan penilaian dokumen keuangan 3 (tiga) tahun terakhir dan Evaluasi dan penilaian kinerja. Klarifikasi kepada peserta lelang terhadap Dokumen Lelang yang masuk. Pemeringkatan calon pemenang lelang
• Ke-6 peserta lelang memenuhi syarat kelengkapan administrasi dan layak untuk dinilai oleh Tim Penilai Wilayah Kerja GMB. • Hasil evaluasi dan penilaian teknis terhadap ke-6 peserta lelang memenuhi minimum komitmen yang ditetapkan dalam Bid Dokumen • Hasil evaluasi penilaian finansial ke-6 peserta lelang memenuhi karena memiliki kemampuan finansial untuk melaksanakan komitmen dan penawaran bonus tandatangan memenuhi minimum bonus tandatangan pada Bid Dokumen • Hasil evaluasi dan penilaian kinerja terhadap ke-6 perusahaan/konsorsium peserta lelang bernilai baik karena umunya memiliki pengalaman dan reputasi yang baik di industri migas maupun non migas.
PEMENANG LELANG PENAWARAN LANGSUNG WK GMB TAHUN 2010-2011 1. BLOK GMB KAPUAS I (Kalteng) Firm Commitment
G&G Corehole Sumur Eksplorasi Total
Konsorsium PT. TransAsia Resources – BP Exploration Indonesia Ltd. Aktivitas Budget US$ 600,000 3 US$ 3,000,000 1 US$ 1,250,000 US$ 4.850,000
Bonus-Bonus Tanda Tangan Equipment & Services Bonus Produksi : 250 BCF 500 BCF 1000 BCF
US$ 1,100,000 US$ 100,000 US$ 500,000 US$ 750,000 US$ 1,000,000
PEMENANG 2. BLOK GMB KAPUAS II (Kalteng) Firm Commitment
G&G Corehole Sumur Eksplorasi Total
Konsorsium PT. TransAsia Resources – BP Exploration Indonesia Ltd. Aktivitas Budget US$ 600,000 3 US$ 3,000,000 1 US$ 1,250,000 US$ 4.850,000
Bonus-Bonus Tanda Tangan Equipment & Services Bonus Produksi : 250 BCF 500 BCF 1000 BCF
US$ 1,100,000 US$ 100,000 US$ 500,000 US$ 750,000 US$ 1,000,000
PEMENANG 3. BLOK GMB KAPUAS III (Kalteng) Firm Commitment
G&G Corehole Sumur Eksplorasi Total
Konsorsium PT. TransAsia Resources – BP Exploration Indonesia Ltd. Aktivitas Budget US$ 600,000 2 US$ 2,000,000 1 US$ 1,250,000 US$ 3.850,000
Bonus-Bonus Tanda Tangan Equipment & Services Bonus Produksi : 250 BCF 500 BCF 1000 BCF
US$ 1,100,000 US$ 100,000 US$ 500,000 US$ 750,000 US$ 1,000,000
PEMENANG 4. BLOK GMB KUTAI TIMUR (Kaltim) Firm Commitment
Konsorsium Senyiur CBM Inc. – Total E&P Kutai Timur Aktivitas
G&G Corehole Sumur Eksplorasi Total Bonus-Bonus Tanda Tangan Equipment & Services Bonus Produksi : 250 BCF 500 BCF 1000 BCF
2 2
US$ US$ US$ US$
Budget 300,000 1,400,000 2,600,000 4.300,000
US$ 2,000,000 US$ 25,000 US$ 500,000 US$ 750,000 US$ 1,000,000
PEMENANG 5. BLOK GMB KUTAI BARAT (Kaltim) Firm Commitment
PT. Sugico Graha Aktivitas
G&G Corehole Sumur Eksplorasi Total
3 3
Budget US$ 600,000 US$ 2,250,000 US$ 3,900,000 US$ 6.750,000
Bonus-Bonus Tanda Tangan Equipment & Services Bonus Produksi : 250 BCF 500 BCF 1000 BCF
US$ 2,000,000 US$ 100,000 US$ 500,000 US$ 750,000 US$ 1,000,000
PEMENANG 6. BLOK GMB SIJUNJUNG (Sumbar) Firm Commitment
G&G Corehole Sumur Eksplorasi Total
Konsorsium PT. Lion Gobal Energi – PT. Bukit Asam (Persero) Tbk. Aktivitas Budget US$ 600,000 2 US$ 1,400,000 2 US$ 3,000,000 US$ 5.000,000
Bonus-Bonus Tanda Tangan Equipment & Services Bonus Produksi : 250 BCF 500 BCF 1000 BCF
US$ 1,000,000 US$ 100,000 US$ 500,000 US$ 750,000 US$ 1,000,000
PERKIRAAN INVESTASI DAN BONUS-BONUS HASIL LELANG PENAWARAN LANGSUNG WK GMB Firm Commitment
Total Komitmen Pasti dan bonus-bonus Aktivitas
G&G Corehole Sumur Eksplorasi Total Firm Commitment Bonus-Bonus Tanda Tangan Equipment & Services Bonus Produksi : 250 BCF 500 BCF 1000 BCF
15 10
US$ US$ US$ US$
Budget 3,300,000 13,050,000 13,250,000 29,600,000
US$ 8,300,000 US$ 525,000 US$ 3,000,000 US$ 4,500,000 US$ 6,000,000