Gasunie, asset management Bertus Postmus EGATEC Copenhagen May 2011
Gasunie asset management Gasunie an overview Asset management approach strategy stakeholders Pas 55 Examples
The Netherlands: 50+ years Groningen gas
= natural gas fields Slochteren field (1959): approx. 3,000 billion m3 and approx. 100 other gas fields Production: NAM (mainly) Marketed: GasTerra Transported: Gasunie
An independent infrastructure provider Before 1 July 2005 One company
After 1 July 2005 Two companies Infrastructure and transport
N.V. Nederlandse Gasunie 100%
25% 25% 50%
Trade 25% 25% 50%
50 years ago: Chapter 1 of the story begins…
Gasunie strategy Mission statement: Gasunie is a European gas infrastructure company. We strive for the highest standards of safety, reliability, efficiency and sustainability. We serve the public interest in the markets on which we are active and work on creating value for our stakeholders.
Strategic pillars Operating and expanding the network
Encouraging gas flows in and towards Northwest EU
Offering supplementary services
Operational excellence is our licence to operate
Encouraging market operations by linking up infrastructure
Full service gas infrastructure company
safe and reliable
gas roundabout for NW Europe
gas storage
efficient and market-driven sustainable (footprint reduction)
realisation of new connections and participation in international supply lines strengthening of LNG position open to alliances
sustainability as a business
Gasunie network in the Netherlands and Germany
Facts & Figures (impression) Transported volume Total length Compressor stations Blending stations 11 Pressure regulation stations Export stations 14 Gas delivery stations LNG storage facility Nitrogen injection 5
125 BCM 15,000 km 18 80 1,300 1
Asset Management - present circumstances
Ageing system Performance still in line with performance indicator signal levels Possible increase in component failures EOL: limiting or ending support for components New law and regulation New standards Dynamic industry
Asset Management - key factors GU-system
Operational excellence Safety Market driven Efficient Reliable Sustainable
Asset Management – future Need for a long term and broad approach:
Focus on more than the technical system Alignment with strategic pillars Long term view Involvement of Stakeholders
Asset Management - topics to be addressed
Evaluation of market future Evaluation of economic and strategic interest View on utilization in the long run View on long term performance Environmental policy Risk based management Technical standards View on stakeholder interest NNO, public, NGO
Asset Management – Market driven Market demand first, then new infrastructure
Asset Management – market driven topics
Evaluation of NG market future Evaluation of economic and strategic interest View on utilization in the long run Environmental policy View on stakeholder interest NNO/peers, public, NGO
Asset Management – technical topics
Safety first Data complete & up-to-date View on long term performance Environmental policy Risk based management Maintenance & replacement Gasunie to day Technical standards stakeholder interest, public, NGO, people
Pigging-inspections
Bow ties risk evaluation Grondzetting 9,9%
Consequences Gas emissie boven richtlijn, niet extreem < 45 m3/h (10 g/sec) 87%
Slijtage 30%
5A 5D5A 5A
threats Externe Corrrosie 35%
Potential danger
5A 5A 5A
Gas emissie boven richtlijn, extreem > 45m3/h 1% 4B 4D4A 4A
External interf erence 25%
4B 4A 4A
Brand 1% H-01 - Omgeving (Lekt gas) 2A 2D2A 2C
Erosie 0%
Explosie 1%
Event that causes danger Falende drukbeheersing 0,1%
2B 2A 2A
1A 1D1A 1C
1B 1C 1A
Desintegratie 10%
4A 4D 4C 4D
V andalisme 0%
Vandalisme: kwaadwillend handelen
4C 4D 4A
Determine priority order with PIMS software
Strategy: Position RTS valve stations in risk matrix and formulate scenarios Risk of valve stations presently categorized as high/critical, therefore action is needed. Risicomatrix ten behoeve van de beoordeling van projecten/managementbeslissingen Gevolgen
Ernst/
Duurzaamheid IV
Zwaarte
Kans op incident of het voorkomen van een situatie
Operational III
Betrouwbaarheid II
Veiligheid I
1
2
3
4
5
Leverings-
Wet- en
Persoonlijke
Niet bekend
Bekend
zekerheid
Regelgeving
Veiligheid
binnen de
binnen de
plaatsge-
Gasunie of
branche/
branche/
vonden bij
in de branche
Gebeurt bij
Gebeurt vaker
nooit van
niet
GU of in
gehoord
ondenkbaar
Exellence Milieu
Ethiek
Footprint
Financiele
reductie
Schade
Reputatie
Externe
per jaar bij Gasunie of in de branche
de branch
Veiligheid p<10-6
Geen effect
Heeft
Geen verstoring
-4
10-6
10-4
10-2
p>1
L
M
H
Geen verzuim
bedrijfsfunctie A
Forse emissie reductie, meer dan 50%
Geen Schade
Geen effecten
L
L
L
L
L
Gewonden
t.o.v. uitgangspunt Zeer klein gaslek of
beperkte verstoring
kleine bodemvervuiling
ondersteunende
B
Verzuim
bedrijfsfunctie Emissie reductie tot
kleine schade (< 5k)
50% t.o.v. uitgangspunt
lokaal bewustzijn
Zeer ernstig
lokale media-attentie
gewonden Ernstig gewonde
Klein gaslek of
ernstige verstoring
Diefstal, privegebruik bedrijfs-
kleine bodemvervuiling
secundaire bedrijfsfunctie
middelen, onjuiste informatie
Emissies neutraal
middelgrote schade
lokale en regionale onrust
t.o.v. uitgangspunt
5k<S<50k
geringe nationale Media-att.
Beperkt Gaslek of
beperkte verstoring
C
Bodemvervuiling D
L
M
H
C
M
H
C
C
M
H
C
C
C
H
C
C
C
C
1 tot 10 doden
Dode of blijvend
primaire
arbeidsongeschikt
bedrijfsfunctie
Nationale onrust, veel
Tot 10% meer emissie
grote schade
nationale en enige
als uitgangspunt
50k<S<500k
internat. Media-attentie
Zeer groot gaslek of
Ernstige verstoring
ernstige fraude, misleid.
bodemvervuiling
primaire bedrijfsfunctie
contractbreuk, privacy inbr.
E
tientallen doden
Meerdere doden
misbr. com. gevoelige info Meer dan 10% emissie
Zeer grote schade
Internationale onrust en
dan uitgangspunt
S>500k
media attentie
honderden doden
Acceptabel zonder verdere voorwaarden, managen op basis van continue verbetering
Acceptabel onder toepassing van ALARA, (inclusief een RIE studie) en op voorwaarde van performance monitoring en een periodieke evaluatie van de LOD's of beheersings
M
Strategy: lower risk
maatregelen door middel van audits of veiligheidsstudies. Risicoacceptatie op afdelingschefniveau. Managen op basis van continue monitoring van de performance
Niet gewenst, binnen 3 tot 6 maanden risicoreducerende maatregelen aanbrengen tot niveau M bereikt is, plan van aanpak + risicostudie noodzakelijk, alleen met instemming van
H
unitmanager B&B mag een H situatie blijven bestaan.
C
veiligheid) kan men besluiten tot handhaving C risico. Identificeer en implementeer barrieres en effect beperkende maatregelen om het risico te beheersen en toon ALARA aan.
Niet acceptabel, direct door maatregelen in ontwerp en bedrijfsvoering terugbrengen tot minimaal H, alleen met instemming RvB en OR (in het kader van een C op gebied van
Structure in line with PAS 55
Asset Management – conclusions
Integrated approach needed Many stakeholders involved Complex systems/evaluations Data is essential Long term view
Result: balance –safety - economy - performance
Asset management is balance
SAFETY
COSTS
PERFORMANCE
Thank you for your attention!