Seminar ‘Energy for Industry | An Eye on the Future’
Programma Energy for Industry – deel 1 Moderator: Aldo Peeters, Head of Energy Discipline, Grontmij Belgium
2
12.30 – 13.00 u. 13.00 – 13.10 u.
13.15 – 13.35 u.
13.40 – 14.10 u.
14.15 – 14.30 u.
14.35 – 14.50 u.
14.55 – 15.10 u.
15.10 – 15.40 u.
ONTVANGST MET BROODJESLUNCH Alexander Daenen Grontmij Belgium Operational Manager Water & Energy
Verwelkoming
Pieter Verachtert Slimme netten en slimme industriële verbruikers: Smart Grids Flanders kansen voor Vlaamse bedrijven. Smart Energy Solutions Program Manager
Uw gids naar een eigen hernieuwbare energieproductie.
Michel Davidts Eneco Belgium Senior Project Manager
Industriële warmtenetten, het relaas van een concrete realisatie.
Kurt Vinck Borealis Energy Manager Belgium
Energie-efficiëntie verhoging door procesoptimalisatie.
Line Alderweireldt Grontmij Belgium Unit Manager Process
Utilization of industrial low-grade waste heat by means of new emerging high-temperature heat pumps. PAUZE
Peter Brøndum Grontmij Denmark Senior Advisor Process, Water & Energy
Energy For Industry – An Eye on the Future 3
Voorwoord
Alexander Daenen Grontmij Belgium NV Operational Manager Industry, Water & Energy
“All of the great empires of the future will be empires of the mind.” Winston Churchill
Wie we zijn | Grontmij Group 4
Derde grootste multidisciplinair advies- en ingenieursbureau in Europa
Voor duurzame infrastructuur & mobiliteit; industrie, water & energie en gebouwen
9.000 professionals
Kantoren in Nederland, Frankrijk, Denemarken, Zweden, België, het Verenigd Koninkrijk, Duitsland, Hongarije, Polen, Turkije, China , Vietnam
Grontmij België: 850 professionals
Grontmij Duurzaam ontwerpen & realiseren
Grontmij Belgium | Mobiliteit - Infrastructuur 6
Highways & roads Noord Zuidverbinding Kempen Offerte project management lopend
A11 bouwvergunning ingediend
©AWV
Oosterweelverbinding Meerwerk ondertunneling Albertkanaal & voorbereidende werken
©AWV
R4 verbindt gunning project management
Grontmij Belgium | Mobiliteit - Infrastructuur 7
Railway & Light-rail Métro Nord Projectbureau gestart in kantoor Brussel
Ligne rouge grand Paris (i.s.m. Grontmij France) offerteverdediging
Grontmij Belgium | Gebouwen – Water 8
Duurzame gebouwen
Water
Brandweer & Civiele Bescherming Hasselt administratief & logistiek nieuwbouwcomplex
Alliance engineer
Grontmij Belgium Energy 9
Elia: project HS – koppelstation Duinbergen Offshore capaciteit op net brengen
Grontmij Belgium Monitoring & Testing 10
opmeting Gewestwegen Limburg
Grontmij Belgium Industry 11
Ladle furnace: nieuw type oven inpassen in een bestaand bedrijf
Voorbereiding shut down van ethyleen/propyleen productie installatie Aeolus project, Uitbreiding Lactose en Syrup produktie
EPCm project Outside Battery Limit gedeelte van 2 nieuwe ovens op de industriële site in de Antwerpse haven
Drivers 12
In 2030 kost energie 5 % van het Belgische BNP (McKinsey) (bij 62 USD/vat…)
http://dougrobbins.blogspot.nl/2011/08/wealth-of-nations.html
Drivers 13
20% reduction in EU greenhouse gas emissions from 1990 levels; Raising the share of EU energy consumption produced from renewable resources to 20%; 20% improvement in the EU's energy efficiency. Objectives to be reached by 2020.
25/10/2012 EU EED
Source: http://geospatial.blogs.com (2012)
Evoluerend kader 14
Veranderend wettelijk kader
Weinig stabiele steunmaatregelen
Druk van publieke opinie
Gestegen prijzen
Concurrentiepositie
Bevoorradingszekerheid
Evoluerende technologie
Dito technisch en organisatorisch inzicht
Evoluerend kader 15
Evoluerend kader 16
Programma Energy for Industry – deel 1 Moderator: Aldo Peeters, Head of Energy Discipline, Grontmij Belgium 17
12.30 – 13.00 u. 13.00 – 13.10 u.
13.15 – 13.35 u.
13.40 – 14.10 u.
14.15 – 14.30 u.
14.35 – 14.50 u.
14.55 – 15.10 u.
15.10 – 15.40 u.
ONTVANGST MET BROODJESLUNCH Alexander Daenen Grontmij Belgium Operational Manager Water & Energy
Verwelkoming
Pieter Verachtert Slimme netten en slimme industriële verbruikers: Smart Grids Flanders kansen voor Vlaamse bedrijven. Smart Energy Solutions Program Manager
Uw gids naar een eigen hernieuwbare energieproductie.
Michel Davidts Eneco Belgium Senior Project Manager
Industriële warmtenetten, het relaas van een concrete realisatie.
Kurt Vinck Borealis Energy Manager Belgium
Energie-efficiëntie verhoging door procesoptimalisatie.
Line Alderweireldt Grontmij Belgium Unit Manager Process
Utilization of industrial low-grade waste heat by means of new emerging high-temperature heat pumps. PAUZE
Peter Brøndum Grontmij Denmark Senior Advisor Process, Water & Energy
Energy For Industry – An Eye on the Future 18
Slimme netten en slimme industriële verbruikers: kansen voor Vlaamse bedrijven Pieter Verachtert Smart Grids Flanders Smart Energy Solutions Program Manager “Als je de toekomst kunt inbeelden ben je al halfweg.” Milton Berle
Slimme netten en slimme industriële verbruikers Opportuniteiten voor Vlaamse bedrijven
Pieter Verachtert Program Manager Smart Energy Solutions 19 september 2013
Gegeven = netbalans is noodzakelijk, …
50Hz
AANBOD
VRAAG
… want anders:
Toename HE zorgt voor uitdagingen Bron: ELIA
Nacht van 30/07 op 31/07: 260 MW minder capaciteit o.b.v. wind dan voorzien
Nacht van 05/08 op 06/08: 633 MW méér capaciteit o.b.v. wind dan voorzien
Toename HE zorgt voor uitdagingen (2) Bron: ELIA
Namiddag van 30/7: 644 MW minder capaciteit o.b.v. zon dan voorzien dag voordien (ID = -307MW)
Late namiddag van 30/7: 540 MW meer capaciteit o.b.v. zon dan voorzien in intra-day voorspelling
Vergelijk: Doel 4 ≈ 1000 MW
Nood aan demand side management Vroeger: Productie sturen op basis van een voorspelling van de vraag.
Nu en in de toekomst: Ook vraag sturen om onvoorspelbaarheid van productie hernieuwbare energie op te vangen
Flexibiliteit = troef Het vinden van manieren om te schuiven met elektriciteitsverbruik kan bedrijven aanzienlijke voordelen opleveren. Flexibiliteit = verbruik tijdelijk verminderen/vermeerderen en later compenseren Voorbeelden van flexibiliteit Op- of afschakelen vriesinstallatie Flexibele voorraad Elektrolyse Flexibele aansturing compressoren, pompen, enz. Koeling in gebouwen Timing onderhoud
Flexibiliteit = troef De voordelen van flexibiliteit zullen in de toekomst alleen maar toenemen. Balanceringsoefening wordt groter en complexer (toename HE) Prijsschommelingen op spotmarkt worden groter. Hoe valoriseren? Via capaciteitsmarkt Op vraag aan- of afschakelen van verbruik Via ELIA, aggregator of leverancier
Via energiemarkt Profiteren van lage (soms negatieve) prijzen op energiemarkten Via ELIA, Belpex of leverancier
Valorisatie via capaciteitsmarkt Demand response
Eindverbruiker verlaagt verbruik tijdens periode van onbalans in net Of verhoogt/verlaagt zijn productie Op vraag van netbeheerder, aggregator of energieleverancier Volgens contract (Y-1) Vergoeding hangt af van aantal calls, timing DR-signaal en duur verbruikswijziging Opbrengst? Voorbeeld: Crop’s = €9000 voor 680kW
(bron: restore.eu)
Valorisatie via energiemarkt • Inspelen op prijsschommelingen op spotmarkt (DA en ID)
Valorisatie via energiemarkt • Inspelen op negatieve onbalansprijzen
Met DSM zit je in kern van smart grid Een smart grid: is een energienetwerk dat nieuwe technologieën inzet om: • de integratie van hernieuwbare energie te vergemakkelijken • het actief schuiven met de vraag naar energie mogelijk te maken • het tijdelijk opslaan van energie mogelijk te maken om zo • de betrouwbaarheid van de energievoorziening te waarborgen • de variabele pieken en dalen in stroomproductie op te vangen • de energiefactuur van gezinnen en bedrijven te verlagen • de energie-efficiëntie te verhogen Tot de onderdelen van een smart grid behoren onder meer sensoren, slimme meters, batterijen, laadpalen voor elektrische voertuigen, intelligente transformatoren, communicatiemiddelen en heel veel software.
Smart Grids Flanders
Platformorganisatie (°2010) Op initiatief van en voor industrie Ondersteund door VOKA en EnergyVille Via samenwerking competitief voordeel creëren voor Vlaamse ondernemingen in smart grid sector
Meer dan 90 leden en partners Betrokken actoren: technologiebedrijven, netbeheerders, energieleveranciers, regulatoren, overheden Betrokken sectoren: elektro-energie, ICT, e-mobility, verwarming, bouwsector, … www.smartgridsflanders.be
Smart Energy Solutions Een project in kader van het Nieuw Industrieel Beleid (Vlaanderen in Actie) met ondersteuning van het Agentschap Ondernemen.
Doel = ondernemingen die nog niet vertrouwd zijn met de energienetten van de toekomst bewust maken van de opportuniteiten die intelligente energienetten (of smart grids) voor hen kunnen inhouden. Doelpubliek = Vlaamse (industriële) bedrijven Activiteiten = informeren, samen brengen, begeleiden www.smartenergysolutions.be
Meer weten over smart grids?
Pieter Verachtert Program Manager
[email protected] Tel. +32 471 92 55 73 http://be.linkedin.com/in/pieterverachtert
Pieter Verachtert Pieter Verachtert Program Manager Program Manager
[email protected] [email protected] Tel. +32 471 92 55 73 Tel. +32 471 92 55 73 http://be.linkedin.com/in/pieterverachtert http://be.linkedin.com/in/pieterverachtert www.smartenergysolutions.be
Energy For Industry – An Eye on the Future 19
Uw gids naar een eigen hernieuwbare energieproductie Michel Davidts Eneco Belgium Senior Project Manager “De toekomst is aan hen die mogelijkheden zien voor ze vanzelfsprekend worden.” John Scully
Energiestudiedag Grontmij .............................................................................................. ... Opportuniteiten tot het ontwikkelen van hernieuwbare technieken in de industrie 19 september Michel Davidts
AGENDA
................................................................................................... • Voorstelling ENECO • Ontwikkelingstraject windturbineparken • PV op vandaag in Vlaanderen • Warmteontwikkelingen
2
........................................................................ .
Onze activiteiten in Europa ................................................................................................... België
Nederland
Duitsland
Frankrijk
UK
Solar
Solar
Solar
Solar
Solar
Wind
Wind
Hydro
Wind
Bio
Bio
Supply
Supply Installation Heating & Cool
3
........................................................................ .
ENECO STRATEGIE: Duurzaam-Decentraal-Samen
................................................................................................... Lange termijn visie: volledig gedecentraliseerde elektriciteitsproductie
4
........................................................................ .
ENECO VISIE
................................................................................................... Eneco streeft naar volledig duurzaam opgewekte elektriciteit in België tegen 2016
5
........................................................................ .
Hoe vertaalt dit zich specifiek in België? ...................................................................................................
100% duurzame, lokale productie en levering energie
300.000 particuliere contracten
6
75
windmolens
4.000 professionele contracten
64 zonnesites
407 GWh Totale jaarlijkse productie
€220 M
200
jaarlijkse omzet
medewerkers
........................................................................ .
ONTWIKKELINGSTRAJECT WINDTURBINEPARKEN
................................................................................................... Vergunningen
Politiek
Administraties
WT ontwikkeling Maatschappelijk
7
Technisch
Wetgeving ........................................................................ .
ONTWIKKELINGSTRAJECT WINDTURBINEPARKEN
................................................................................................... POLITIEK • • • • •
Federaal (offshore) Gewestelijk Provinciaal Gemeentelijk Meerderheid/minderheid
ADMINISTRATIES • • • • • • •
Instituut voor Natuur- en Bosonderzoek Departement Leefmilieu, Natuur en Energie Belgocontrol Belgisch Instituut Post en Telecommunicatie Defensie Ruimtelijke ordening Agentschap Wegen en Verkeer
WETGEVEND KADER
TECHNISCH
• VLAREM • Energiedecreet • Groene Stroomcertificaten
• • • • •
VERGUNNINGEN • Stedenbouwkundige vergunning • Milieuvergunning Omgevingsvergunning 2014? • MER – MER ontheffing
8
Geluid Slagschaduw Veiligheid Productie Netaansluiting
MAATSCHAPPELIJK • Klanten industrieel / particulier • Participatie • VWEA
........................................................................ .
LADM concept (Levering Achter De Meter)
................................................................................................... Kostprijs van stroom geleverd vanuit het net is functie van 2 elementen: – Volume – Profiel of de voorspelbaarheid van het verbruik.
Door decentrale productie zal het volume van de stroom niet alleen verminderen maar zal ook het profiel minder gunstig worden. Deze additionele onbalanspremies kunnen hoog zijn en een deel van de besparing op vlak van distributie kosten teniet doen.
M3
Public grid
M1
Injection
9
M2
Supply
Om deze bijkomende kosten te vermijden heeft Eneco, als enige op de markt, het concept LADM ontwikkeld.
........................................................................ .
Project Zeebrugge achterhaven
................................................................................................... Project van 4 Turbines met een vermogen van elk 3MW. Eneco draagt de volledige investering en coördineert hierin het volledige traject van projectontwikkeling tot realisatie en exploitatie voor zijn rekening.
10
........................................................................ .
Project Zeebrugge achterhaven
................................................................................................... chronologie:
- 2009-2010 MER studie voor de ganse haven in samenwerking met Grontmij - 2010 Localisatienota (met Grontmij) - 2010-2011 onderhandelingen met concessiehouders Toyota en Wallenius - 2010-2011 opstellen van vergunningsdossiers (met Grontmij) - 2011-2013 onderhandelingen met de verschillende overheden - 2012 voorstudie netkoppeling (met Grontmij) - 2012 voorstudie parkbekabeling (met Grontmij) - 2013 verkrijgen van de bouw- en milieuvergunning - 2014 Q2: bouw van 4 turbines 11
........................................................................ .
PV op vandaag in Vlaanderen
................................................................................................... Waarom investeren in photovoltaïsche panelen?
– Strategische keuze:
lange termijn kennis m.b.t. beheersen v.d. kosten voor elektriciteit
– Technologisch risico: beperkt indien samenwerking met financieel stabiele en professionele partners – Rendement:
streefdoel is 5%
– Imago:
12
........................................................................ .
PV op vandaag in Vlaanderen
................................................................................................... Steunmechanisme – Is een complex gegeven geworden, streefdoel is rendement 5% op 15 jaar – Iedere 6 maanden wordt een nieuw tarief vastgelegd. Dit tarief wordt berekend op basis van het onrendabele topmodel. – Bandingfactor: 0,72 (functie vermogen) – 1 GSC = 93€ (gegarandeerd door de netbeheerder) – Steun: bandingfactor * waarde v/d GSC = 0,72*93 = 66,96€/MWh – Een injectie taks van +/- 3€/MWh – Steun gedurende 15 jaar
Het uiteindelijke doel is grid-parity: zonder ondersteuning rendabel kunnen investeren.
13
........................................................................ .
Praktische realisatie
................................................................................................... Voorbereiding: – – – – –
Netstudie bij de netbeheerder (mogelijkheden van het net) Stabiliteitsstudie (draagkracht van het dak) Opstellen van financieel plan (investerings- en onderhoudskosten) Prijsaanvragen Contracting met garantiebepalingen op: - Panelen - Omvormers - Structuren - Opbrengstgaranties
Bouwfase: – Werfopvolging
Exploitatiefase: - Opvolgen van de werking en de opbrengsten van de installatie - Onderhoud (o.a. reinigen van panelen, jaarlijkse inspectie)
14
........................................................................ .
warmteontwikkelingen
................................................................................................... Kader Restwarmtegebruik maakt grote CO2 reductie mogelijk aan relatief lage kostprijs. Tot 1/14 t.o.v. andere bronnen om rendabel te zijn. Dit inzicht heeft ertoe geleid dat de EU restwarmtegebruik wil stimuleren. Deze visie vertaald zich in lokale wetgeving en ondersteuning. In Vlaanderen schat het Vito dat, om te voldoen aan de vereiste 13% hernieuwbare energie tegen 2020, deze voor 50% zou kunnen ingevuld worden door groene warmte. Hiervoor dient het huidige volume aan groene warmte x 3. Het steunmechanisme bestaat uit een 6 maandelijkse oproep voor projecten >1MW. Projecten die met het minste steun kunnen gerealiseerd worden krijgen steun. 15
........................................................................ .
Warmteontwikkelingen
................................................................................................... Als gevolg van de wetgevende evolutie en de technologische maturiteit beweegt de markt in Vlaanderen. Bestaande projecten, zoals Mirom in Roeselare, breiden voor het eerst in jaren uit. Tal van nieuwe projecten dienen zich aan projecten die zich enerzijds richten op stadverwarming anderzijds op industriële schaal. Antwerpen Zuid (stadkernvernieuwing) Haven van Antwerpen, Haven van Gent, POM-Limburg, POM-WestVlaanderen,….. Eneco heeft, als marktleider in Nederland, ambities op de Belgische markt dit als investeerder en als service verlener. 16
........................................................................ .
VRAGEN?
................................................................................................... Michel Davidts Eneco België Battelsesteenweg 455i 2800 Mechelen Tel.: 0476/72 10 71 015/40.41.40
17
........................................................................ .
Energy For Industry – An Eye on the Future 20
Industriële warmtenetten, het relaas van een concrete realisatie
Kurt Vinck Borealis Energy Manager Belgium “Geïnspireerd worden betekent: zich de toekomst herinneren.” Eric van der Steen
Borealis – Bionerga Heat and power integration Vinck Kurt
Borealis site Beringen
2|
Polypropyleenfabrieken
Verpakkingsafdeling
Compounding
Labo
Nutsvoorzieningen Technische dienst
Energy consumption Borealis Polymers Borealis Beringen makes part of the Flemish Benchmarking Covenant (> 0,5 PetaJoule / year ) and strives towards energy efficient production of polypropylene Beringen site : •CO2 emission of +/- 60 kton /year . •Heat demand of +/- 300 GWh / year. •Approx 20 MW electrical .
• Energy efficiency Borealis
•Lowering CO2 emissions. •Competitive Energy cost
Opportunity to integrate with Bionerga
Who? New WtE-installation (BREF / R1) 200.000 ton non-recyclable waste a year
- Electricity 20 MWe (max) or 160,000 MWhe / year
Energetic output: 100 t/h steam of 50 bar(a) and 410 °C = 75 MWth
delivery
- Steam (superheated) max 43 bar(a) – up to 25 MWth
- Hot water Ca. 120 °C at 6 bar(a) – up to 20 MWth District Heating
Company owned by local public shareholders (communities of Limburg)
Company owned by international shareholders
Specialized in waste management Locally oriented
World leader in chemical and innovative plastics
“Warmtenet Ravenshout” Local Heat Grid
Project considerations − Availability of heat and power are essential for Borealis – Steam needed for safety purposes − Optimum balance between steam production and steam import. − Commercial agreement between 2 companies for extended time. − Considering all possible scenarios as result to economical conditions !
7|
Project Specifics − (European) Public tender was not known by Borealis. − Steam connection and integration. − Connection to the CDS of Borealis – 150 kV Connection. − Engineering standards. − Operational agreements (Shut downs – Consumption nominations ). − Measuring and data exchange. − Safety integration
9|
Integration Elia 150 kV Net +/- 15 MW Thermal Medium pressure Steam
+/- 16 MWe
Future possibilities
Non-used land
Eco2Profit – POM
Thank you
Unless otherwise specifically stated, this presentation, any part of it, or any information contained herein may only be copied, disclosed or used within the Borealis group of companies. Borealis AG and its affiliates give no warranty and make no representation as to the accuracy, completeness or fitness for any particular use of the information contained herein.
13 |
Businesses can only grow in a healthy environment and in a stable and wealthy society
14 | Company Presentation | 2013
Energy For Industry – An Eye on the Future 21
Energie-efficiëntie verhoging door procesoptimalisatie
Line Alderweireldt Grontmij Belgium NV Unit Manager Process “De toekomst kun je het best voorspellen als je er zelf vorm aan geeft.” Alan Kay
Grontmij Sustainable design & engineering
Case | Optimalisatie energiestromen in het spanningsveld Product-Batch-Energie
Product
Energie Batch
Case| Fructose/proteïne productie 3
Grondstof
Fructose 3 11 t /jaar
Proteïne 39 t/jaar
Fructose 1
Fructose 2
32 t/jaar
8 t/jaar
Case | Voedingsconcern
Fructose:
Proteïne:
Bijna clean room productie
Bijna clean room productie
Equipment lijst – 10 indampers – 10 buffer tanks – 2 crystallizer – 8 decanter – 5 centrisieve – 6 mengtanks – 4 drogers
Equipment lijst – 4 mixing tanks – 12 storage tanks – 1 filter met 4 recirculatie tanks – 3 decolorisatie units – 2 Evaporators + 4 recirculatie tanks
Target: 37 % uitbreiding
Target: 50 % uitbreiding
4
Case | Voedingsconcern Fructose 5
Kristallisatie Scheiding Decantatie Centrisieve
Oplossen Filtratie Droging
Case | Voedingsconcern Proteïne 6
Indampen Stockage
Filtratie Decolorisatie
Indampen stockage
Grontmij | Utilities nieuw ontwerp opstellen 7
Startgegevens: Utilities Realiteit is discontinu
100 99 98 97 96 95 94 93 92 91 90 89 88 87 86 85 84 83 82 81 80
Steam 19bar Steam 12 bar Chilled Water Cooling water Well Water Compr.Air Wastewater Solid Waste Electricity HVAC
Pic Consumption
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47
t/h t/h m3/h kW kt/y m3/min kt/y kt/y MW
43 27 400 8500 1080 130 ?, te warm varia 8 tbc
Grontmij | Utilities nieuw ontwerp opstellen 8
Plan van aanpak: 1. Batch recept, actueel utilities verbruik per process stap 2. Productieplan opstellen 3. Nieuwe utilities massa balans per process stap bepalen 4. Globale utilities consumption in de tijd 5. Challenge investering productie utilities
Aanpak | 1. Batch recept opstellen 9
Aanpak | 2. Productieplan opstellen
Leerproces:
Snelheden Gelijktijdigheid Prioriteiten Productieritme
.. 10
Aanpak | 3. Nieuw Batch recept uitwerken 11
• Per receptstap: • capaciteit nieuw equipment • benodigde tijd • utilities
Aanpak | 4. Nieuw globaal utilities verbruik 12
• Verbruik per medium per uur • Vergelijk piek verbruik met gemiddeld benodigd verbruik
Aanpak | 5. Challenge investering productie utilities 13
Ter herinnering: Fructose: 37 % uitbreiding Proteïne: 50 % uitbreiding
Steam 19bar
t/h
43
1 nieuwe stoomketel, dus zes totaal
Steam 12 bar
t/h
27
niet uitgebreid
Chilled Water
m3/h
400
1 koelgroep extra
Cooling water
kW
8500
2 MW koeltoren extra
Well Water
kt/y
1080
Niet uitgebreid
Compr.Air
m3/min
130
Niet uitgebreid
Wastewater
kt/y
?, te warm
aparte studie en meetcampagne
Solid Waste
kt/y
varia
varia
Electricity
MW
8
8
Danku !
100 99 98 97 96 95 94 93 92 91 90 89 88 87 86 85 84 83 82 81 80
Pic Consumption
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47
Energy For Industry – An Eye on the Future 22
Utilization of industrial low-grade waste heat by means of new emerging high-temperature heat pumps
Peter Brøndum Grontmij Denmark Senior Advisor Process, Water & Energy
“The best way to predict the future is to invent it.” Alan Kay
Utilization of industrial low grade waste energy ….
Energy for Industry – An Eye on the Future, 19. september 2013
Peter Brøndum, Grontmij, Aarhus, Denmark
Copyright © 2013 Grontmij A/S | CVR 48233511
1
Refrigeration plant vs. Heat pump
Refrigeration plant
Heat pump
Copyright © 2013 Grontmij A/S | CVR 48233511
2
Principle for Heat Pump 3
Sink
Elektricity
Source
60 – 130°C
10 – 60°C
Energy in
+
1
=
4
Copyright © 2013 Grontmij A/S | CVR 48233511
3
Energy out
The abridged edition
•
Heat pump > 500kW
•
High temperature > 85°C
•
Natural refrigerant
Copyright © 2013 Grontmij A/S | CVR 48233511
4
Philosophy 5
1. Minimize the energy consumption 3. Consider what is the suitable energy source for the remaining demand.
Copyright © 2013 Grontmij A/S | CVR 48233511
2. Use heat exchange
Technologies 6
− High pressure heat pump with ammonia. Normal circuit – just higher pressure.
− Transcritical CO2 – temperature glide on the hot side − Hybrid energy (Norway, 6 plants installed, Denmark 1 plant) –temperature glide on both sides. − Water vapour – few taylor made plants installed Normal circuit – low pressure.
Copyright © 2013 Grontmij A/S | CVR 48233511
− HC - solution, normal circuit
Copyright © 2013 Grontmij A/S | CVR 48233511
Arla – in Danish 7
1,2 MW HP Arla, Milk Powder
Pre heating Heat pump heating Totale Energy saving
6.435.150 kWh 9.964.550 kWh 16.399.700 kWh
Heat pump Utility Total electricity
-2.065.022 kWh 658.600 kWh -1.406.422 kWh
Total saving
14.993.778 kWh
Copyright © 2013 Grontmij A/S | CVR 48233511
8
Heat Pumps
We can add value to the process: • Screening tools • Selection tools • Standardize And make sure that the next train is running faster and safer.
Copyright © 2013 Grontmij A/S | CVR 48233511
The heat pump train is on the track– even without Grontmij Denmark.
5. 3.
6. 4. 1.
2. Copyright © 2013 Grontmij A/S | CVR 48233511
Six simple questions 10
What do we need to know? 11
Starting point: •
A pilot project should not take one year, but a month.
•
It should not cost 100.000, but 10.000…
•
Which COP can we expect?
•
Which technology is suitable?
•
What is the investment?
•
What is the saving?
Copyright © 2013 Grontmij A/S | CVR 48233511
What do we want to know:
Which COP can we expect? Carnots efficiency: COPc = T2/(T2-T1)
Source temperature 22⁰→ evaporating temperature = 19⁰
T2
Water out 85⁰→ condensing temperature = 88⁰ COPc = T2/(T2-T1) = (273+88)/(88-19) = 5,2 T1
Realistic approach: COP 3,5
Copyright © 2013 Grontmij A/S | CVR 48233511
Peters’ rule of thumb: Max achievable COP = 2/3 of COPc
Is it possible 13
•
Engineering, design, erection, commissioning and operation of a heat pump plant is similar to an ordinary refrigeration plant.
•
The question is not whether you need a heat pump – but whether a heat pump fits into you energy supply.
•
The three commandments:
1. save 2. exchange 3. and then consider ….
Copyright © 2013 Grontmij A/S | CVR 48233511
Is there any barriers for heat pumps?
Content of a tool
Reference Heat demand Surplus energy Heat pump Prices and taxes Economy
Input
Output
Copyright © 2013 Grontmij A/S | CVR 48233511
• • • • • •
Thank you 15
Peter Brøndum
[email protected]
Copyright © 2013 Grontmij A/S | CVR 48233511
www.grontmij.dk
Programma Energy for Industry – deel 2 Moderator: Aldo Peeters, Head of Energy Discipline, Grontmij Belgium 15.45 – 16.00 u.
16.05 – 16.20 u.
16.25 – 16.40 u.
16.45 – 17.15 u.
17.15 u.
Vanaf 17.30 u.
Sustainable industrial buildings: Is BREEAM of LEED een piste voor u?
Michaël Dierickx Grontmij Belgium Teamleader Bouwteam
Wereldtop dankzij vooruitstrevende warmte-integratie en procesaanpassingen.
Steven Vermeulen Kuraray – Eval Europe Process development manager
Goodbye convenanten! Welcome energiebeleidsovereenkomst?! Wat te verwachten van de nieuwe EBO?
Carolien Pouleyn VOKA Lid van de commissies Auditconvenant en Benchmarking
Wereldwijde ontwikkelingen op het vlak van energie en klimaat, met hun impact op de Belgische industriële verbruiker. Wrap-up en Outlook.
Peter Claes Febeliec General Manager Patrick Van de Velde Grontmij Belgium NV Business Line Director
RECEPTIE & NETWERKMOMENT
23
Energy For Industry – An Eye on the Future 24
Sustainable industrial buildings: Is BREEAM of LEED een piste voor u?
Michaël Dierickx Grontmij Belgium NV Teamleader Bouwteam
“Wie de jeugd heeft, heeft de toekomst, zegt men. Het zou eerlijker zijn die toekomst aan de jeugd te geven.” Alexander Pola
BREEAM of LEED Hoe duurzaamheid van een gebouw meetbaar maken ? Energy for Industry – An Eye on the Future Westerlo, 19 september 2013 ir. Michaël Dierickx
1
Agenda Waarom certificeren? BREEAM LEED Plan van aanpak Aandachtspunten Referenties
2
Waarom certificeren? Doelstellingen Beperken van impact gebouwen op omgeving In vergelijkbare eenheden beoordelen van duurzame gebouwen Geloofwaardig label, i.o.m. hun ecologische impact Vraag naar duurzame gebouwen stimuleren Criteria vastleggen die wetgeving overstijgen Bewustmaking van/uitdaging voor gebouweigenaars, -gebruikers, ontwerpers en aannemers 3
Waarom certificeren? Voordelen voor gebouweigenaar Waarde van gebouw neemt toe (tot 8,5%) Vlottere verkoop of verhuur (tot 3,5%) Vermindering van operationele kosten: onderhoud, … (tot 9,5%) Commerciële meerwaarde
4
Waarom certificeren? Voordelen voor gebouwgebruikers Verbetering van werkomstandigheden Toename productiviteit Kantoren: 2 tot 4% (16%) Retail: stijging verkoop per m² Scholen: 10 tot 15% betere resultaten
Vermindering van operationele kosten: energie (tot 32%), … Commerciële meerwaarde Bewustmaking 5
BREEAM Definitie Building Research Establishment’s Environmental Assessment Method Wereldwijd beschikbaar én vergelijkbaar 15.600 projecten gecertificeerd 44.200 projecten geregistreerd
Gebaseerd op Europese wetgeving en normen Aanpasbaar per land
6
BREEAM BREEAM schemes
Duitsland Nederland Noorwegen Spanje UK Zweden
International
7
BREEAM BREEAM scheme: International BREEAM Europe Commercial (nieuwbouw en zware renovaties)
Kantoren Retail Industrie
BREEAM International Bespoke (nieuwbouw en zware renovaties)
BREEAM Communities BREEAM In-Use (bestaande gebouwen)
8
BREEAM BREEAM International: verantwoordelijkheden (!) BREEAM New Build Accredited Professional: Grontmij Assessor: Grontmij Auditor: BRE
BREEAM In-Use Assessor: opdrachtgever Auditor: Grontmij
9
BREEAM – score-systeem Prestatiecriteria - credits
Management (12%) Health and Wellbeing (15%) Energy (19%) Transport (8%) Water (6%) Materials (12,5%) Waste (7,5%) Land Use and Ecology (10%) Pollution (10%) 10
BREEAM – score-systeem Globale score Minimum prestatie-eisen Bonuspunten voor innovatie Ratings:
<30% >30% >45% >55% >70% >85%
UNCLASSIFIED PASS GOOD VERY GOOD EXCELLENT OUTSTANDING
11
BREEAM – score-systeem
12
LEED Definitie Leadership in Energy and Environmental Design Wereldwijd beschikbaar én vergelijkbaar 51.700 projecten geregistreerd en gecertificeerd
Gebaseerd op Amerikaanse wetgeving en normen Niet aanpasbaar per land
13
LEED LEED schemes
New Construction & Major Renovations Existing Buildings, Operations and Maintenance Commercial Interiors Core and Shell Development Retail Schools Homes Neighbourhood Development Healthcare 14
LEED LEED schemes: verantwoordelijkheden (!) Accredited Professional: Grontmij Assessor: US Green Building Council
15
LEED – score-systeem Prestatiecriteria - credits
Sustainable Sites (23,5%) Water Efficiency (9%) Energy and Atmosphere (32%) Material and Resources (12,5%) Indoor Environmental Quality (13,5%) Innovation (5,5%) Regional Priority (4%)
16
LEED – score-systeem Globale score Minimum prestatie-eisen Ratings:
<40% >40% >50% >60% >80%
UNCLASSIFIED CERTIFIED SILVER GOLD PLATINUM
17
Plan van aanpak BREEAM/LEED-assessor Pre-assessment (voorontwerp) Vereenvoudigde beoordeling Niet verplicht, wel aanbevolen
Assessment na definitief ontwerp Volledige beoordeling van ontwerp, incl. bewijsvoering Interim certificaat
Assessment as-built Controle van score na oplevering, incl. bewijsvoering Finaal certificaat
18
Plan van aanpak Mogelijk extra studiewerk en bewijsvoering
Architectuur Stabiliteit Technieken Omgevingsaanleg
Aannemers In functie van de beoogde score ! Geen bewijs = geen credit !
19
Aandachtspunten Gemotiveerde bouwheer is essentieel Zo vroeg mogelijk deskundigen bij ontwerp betrekken Duidelijke afspraken maken (wie-wat-hoe-wanneer)
Bouwheer Architect Studiebureau Aannemer
20
Aandachtspunten Niet steeds noodzakelijk om ingreep door te voeren, soms volstaat haalbaarheidsstudie voor credit Meerkosten, functie van beoogde score Studiekost fees deskundigen bijkomend studiewerk
Bouwkost
Administratie en bewijsvoering niet onderschatten
21
Referenties BREEAM New Build
Hoofdkwartier Grontmij, Mechelen GlaxoSmithKline, Waver Zwin Natuurcentrum, Knokke-Heist Tramstelplaats Marconi, Brussel British School of Brussels
22
Referenties BREEAM In-Use Belgacom Torens, Brussel Belfius Tower, Brussel Belfius Galilée, Brussel
LEED Logistiek centrum Kuehne+Nagel, Geel
23
Bedankt voor jullie aandacht ! Contactgegevens Michaël Dierickx
[email protected] 015/45 13 00
Meer informatie www.grontmij.be www.breeam.org www.usgbc.org/leed
24
Energy For Industry – An Eye on the Future 25
Wereldtop dankzij vooruitstrevende warmteintegratie en procesaanpassingen
Steven Vermeulen Kuraray – Eval Europe Process development manager “Het risico van succes is de arrogante veronderstelling dat hetgeen je in het verleden hebt gedaan ook in de toekomst zal werken.” C. William Pollard
Energy for industry AN EYE ON THE FUTURE 19 September 2013 Steven Vermeulen
KURARAY CO., LTD. • Japans concern (est. 1926) • Werknemers: +/- 7000 (1500 buiten Japan) • Hoofdkantoor: Tokyo • Nadruk op ontwikkeling van nieuwe producten met hoge toegevoegde waarde Eval Europe NV: • 100% dochteronderneming van Kuraray • Werknemers: +/- 100 • Opstart: 1999 • Merknaam EVAL • Productie van Ethyleen Vinyl Alcohol (EVOH) barière polymeer
Zuurstofdoorlaatbaarheid PA PET
Toepassingen:
•Voedselverpakking • Brandstof tanks • Vloerverwarming • Landbouwfolie • ....
OPP Oriented polypropylene
LDPE low density polyethylene CONFIDENTIALbij gelijke dikte & condities Zuurstofdoorlaatbaarheid
A global company
EVAL™ resin production in Okayama, Japan – Houston, Texas – Antwerp, Belgium
EVAL Productieplatforms
Pasadena Texas - USA 35 000 T 47 000 T (2013)
Zwijndrecht Belgium 24 000 T
Okayama Japan 10 000 T
Kuraray EVAL Europe – Ineos site - Zwijndrecht
← Schelde River
EVAL™ EVOH production site and Technical Centre
Line 1 Line 2 Control Room, Lab ETC
Packaging
EVAL productieproces Energie-intensief proces : 1. Grondstofkringlopen in het process 2. Verschillende KWS-mengsels dienen dmv (extractieve) destillatie opgezuiverd te worden 3. Verschillende droogstappen in het proces
EVAL Europe en benchmarking Ingestapt in het Benchmarkingconvenant in 2004:
EVAL Europe en benchmarking Ingestapt in het Benchmarkingconvenant in 2004: 1. Consultant stelt benchmark rapport op om te bepalen waar de wereldtop zich bevond. 2. Energieplan opgesteld gebaseerd op 4 peilers: a. Pinch analyse b. Distillation Efficiency Improvement c. Electricity Saving d. Operational Excellence 3. Meerjaren inversteringsprogramma ingediend om dit plan uit te voeren – implementatie ism Grontmij (inhouse contractor)
EVAL Europe Energieplan Peiler 1 Pinchanalyse: 1. Overhead – bodem heat recovery projecten in destillatiekolommen 2. Condensaat warmte recuperatieprojecten 3. Feed preheat projecten in destillatiekolommen
EVAL Europe Voorbeeldproject Drukverhoging in C-xxx4 om voldoende dT beschikbaar te hebben om op kolommen C-xxx1,2 en 3 stoom als warmtebron te vervangen
Druk verhoging
C-xxx4
C-xxx1
C-xxx2
C-xxx3
EVAL Europe Energieplan Peiler 2 Destillatie efficienctie verbeteringen: 1. Trays vervangen door andere types 2. Voedingspunt optimalisaties 3. APC
EVAL Europe Energieplan Peilers 3 en 4 Electriciteitsbesparing: 1. Grote blower uit dienst nemen 2. Ethylene compressor capaciteitssturing Operational excellence: 1. Energieverbruiken tijdens productwissels screenen en efficienter laten verlopen 2. KPI monitoring om energie-efficientie te bewaken 3. Trainingsprogramma voor operators
Energieplan – resultaat (Q) Steam KPI (Ton / Ton EVOH)
Voedingspunt optimalisatie Lijn 2 Optimalisatie
SU Lijn 2 Lijn 1 Optimalisatie
Destillatie warmte recuperatie Inline GC in destillatie OVHD
2001
2002
Destillatie warmte recup. Feed Preheat High Eff Trays Destillatie warmte recup. Feed Preheat High Eff Trays Condensaat recup. Destillatie warmte recup. High Eff. Trays APC Voedingspunt optimalisatie Feed Preheat Directe voeding ipv via tankfarm Condensaat warmte recup.
Deze reductie is enkel mogelijk door
2003
2004
2005
2006
2007
2008
2009
2010
Operationele focus/bewustzijn + Management Focus!
2011
EVAL Europe – Wereldtop Opstart
2e
lijn
Lager productievolume (crisis)
EVAL Europe – projecten in uitvoering 2013: • 2 feed preheat projecten op destillatiekolommen lijn 1 (heat exchangers, piping, controls) • Efficientere layout condensaatnet lijn 1 (piping) • Aanpassingen regelkleppen in warmterecuperatie toepassingen = verder bouwen op eerdere projecten (controls, piping) 2014: • 2 feed preheat projecten op destillatiekolommen lijn 2 • Nieuwe technologiën worden gescreend ism Kuraray process development department, Japan
EVAL Europe – Energieplanning anno 2013 •
•
Warmte: nieuwe Energiestudie gestart om te zoeken naar verdere besparingen. Drivers hiervoor: • Verzwakte concurrentiepositie met US • Stijgende energieprijzen in Europa • Energieaudit - EBO (?) • Rolmodelpositie mbt energie-efficientie binnen Kuraray versterken • Nieuwe technologiën uittesten die later in andere productieprocessen binnen Kuraray kunnen worden overgenomen. Electriciteit: niet in detail uitgewerkt tijdens benchmarkperiode studie gestart met Grontmij
Energy For Industry – An Eye on the Future 26
Goodbye convenanten! Welcome energiebeleidsovereenkomst ?! Wat te verwachten van de nieuwe EBO? “Ik ben niet geïnteresseerd in het verleden. Ik ben geïnteresseerd in de toekomst want daar verwacht ik de rest van mijn leven in te vertoeven.” Charles F. Kettering
Carolien Pouleyn VOKA Lid van de commissies Auditconvenant en Benchmarking
Goodbye convenanten! Welcome energiebeleidsovereenkomst?! Wat te verwachten van de nieuwe EBO? Jo luistert_111108 1
Carolien Pouleyn Adviseur Milieu en Energie
Goodbye convenanten?
Convenanten • 88% van het industrieel energieverbruik van Vlaanderen • Doelstelling: energie-efficiëntie van de energie-intensieve industrie verbeteren (vanaf 0,1PJ) • Benchmarkconvenant (2012): wereldtop op gebied van energieefficiëntie = Resultaatsverbintenis • Auditconvenant (2013): uitvoeren rendabele maatregelen volgend uit Jo luistert_111108 2
energieaudit = Actieverbintenis
Goodbye convenanten?
Tegenprestaties • Verlaagde heffingen qua accijnzen • Vrijwaren van bijkomende energie- of CO2-taksen • Korting op federale bijdrage op energie • Reservatie Vlaamse steun tot bevordering van energie-efficiëntie
Jo luistert_111108 3
Welcome EBO?!
Convenanten
EBO
Jo luistert_111108 4
- Absolute targets: doelstelling van X% energiebesparing
- Inspanningsverbintenis: blijvend verbeteren op maat van de onderneming
- Benchmarking (wereldtop, 15% IRR) - Audit (13,5% IRR)
- VER (14% IRR) - niet-VER (12.5% IRR)
- Eng energieplan
- Flexibele maatregelen - Economische pardonnabiliteit - Energiebeheermaatregelen
Wat te verwachten van de nieuwe EBO? Engagement van de onderneming
• Audit door interne of externe energiedeskundige • Identificatie studiemaatregelen, rendabele en potentieel rendabele maatregelen • Chronologisch stappenplan met timing rendabele + studiemaatregelen + energiebeheermaatregelen
Energieaudit en -plan
• Verslag: uitgevoerde maatregelen, studies en herrekeningen van potentieel rendabele maatregelen, inzet flexibele maatregelen • Energieverbruik en CO2-eq-emissies + evoluties
Verslaggeving
Jo luistert_111108 5
Nieuwe engagementen
• • • •
Studie economisch potentieel kw. WKK en bijdrage warmte- en koudenetwerken Toelichting + voortgang energieplan aan CPBW Koppeling EBO en steunmaatregelen (EP-plus, GSC,…) Energiebeheermaatregelen / ISO 50001
Wat te verwachten van de nieuwe EBO?!
Vlaamse Regering
Commissie
• Geen bijkomende maatregelen inzake CO2-reducties • Nodige informatie voorzien voor aanmelding bij EC als steunmaatregel (accijnsvrijstelling- of verlaging) • Communicatie rond energie-efficiëntie
• Toelichtingen schrijven over: flexibele maatregelen, energiebeheermaatregelen, potentieelstudie WKK • Opstellen jaarlijks rapport
Jo luistert_111108 6
Wanneer te verwachten?
Jo luistert_111108 7
2011: start onderhandelingen EBO
Nov. 2012: verlenging BC
20 dec. 2012: 1ste principiële goedkeuring door VlaReg
2 mei 2013: hoorzitting in Vlaams Parlement
Apr. 2013: vragen van de EC over staatssteun
Jan. 2013: prenotificatie bij Europese Commissie
Sept. 2013: overleg met de EC?
Dec. 2013: verlenging AC
Start nieuwe EBO??
Energy For Industry – An Eye on the Future 27
Wereldwijde ontwikkelingen op het vlak van energie en klimaat, met hun impact op de Belgische industriële verbruiker
Peter Claes Febeliec General manager of Febeliec
“If you do not think about the future, you cannot have one.” John Galsworthy
Energy Nr. 1 theme for the 21st century…
September 2013 Peter Claes 1
Energy in perspective Key Challenges • • • •
Increased world population Increased per capita energy consumption Environmental impacts Fossil fuel supply limitations (?)
Please note : “it is tough to make predictions, especially about the future” (Niels Bohr) 2
Growth in per capita consumption 1970-2030
Note : 1 tep = 1 ton equivalent petroleum = 11.6 MWh
3
Evolution energy consumption per fuel
Source : World Energy Outlook 2012 – OECD/IEA 4
CO2-emissions per region
Source : World Energy Outlook 2012 – OECD/IEA 5
Where is the solution ?
6
Energy – what does the world need ?
Key criteria • Reliable access (1,3 Bio people still have no electricity access) = security of supply • Affordable pricing (energy is a necessity for economic and social development) • Efficiency and manage CO2 emissions (try to stay in the 450 scenario) • Safety (quid nuclear ?) 7
Energy – what is coming at us What will be important • The sun !
8
Incoming solar energy
Note : 1 PW = 1015 W
9
Energy – what is coming at us What will be important • The sun ! … and there is plenty of it, but how do we catch it ? • Other renewables
10
Renewables don’t come cheap …
Source : World Energy Outlook 2012 – OECD/IEA 11
Is Germany the most sunny country in the world ?
12
Energy – what is coming at us What will be important • The sun ! … and there is plenty of it, but how do we catch it ? • Through renewable energy production ! … so it’s expensive but possible - but we need something in addition for power generation: • What about coal ? 13
Incremental world primary energy demand 2001-2011 - Coal is the big winner !
Source : World Energy Outlook 2012 – OECD/IEA
14
Coal contributes most to CO2 emissions
Source : World Energy Outlook 2012 – OECD/IEA
15
Energy – what is coming at us What will be important • The sun ! … and there is plenty of it, but how do we catch it ? • Through renewable energy production ! … so it’s expensive although possible – but we need something in addition for power generation: • What about coal ? Most CO2 generating technology wins … what about : • Natural gas ? 16
(Shale) Gas replacing coal in USA
Source : World Energy Outlook 2012 – OECD/IEA
17
18
Shale gas doesn’t come automatic … Shale (unconventional) gas drivers : • • • • •
Directional drilling Hydraulic fractioning Economic incentive (gas & fuel price) Who owns what is under the ground ? Societal culture … 19
Energy – what is coming at us What will be important • The sun ! … and there is plenty of it, but how do we catch it ? • Through renewable energy production ! … so it’s expensive although possible – but we need something in addition for power generation: • What about coal ? Most CO2 generating technology wins … what about … • Natural gas ? Likely a (r)evolution in fossil fuel use .. • Is nuclear dead ?
20
Nuclear is not static
21
Nuclear development
Source : World Energy Outlook 2012 – OECD/IEA
22
So what do we do ?
Are there any other issues ? It would seem so … • • • •
Economics Complexity Uncertainty (International) politics
24
Economics
• Price of energy will determine economic competitiveness - see USA re-industrialization • Electricity at the core of the discussions ! • Most “expensive” electricity is power interruption • Market models unclear – free market disrupted through massive subsidies for renewables • Base fuel prices have significant impact on technology selection
25
Complexity & uncertainty
• Climate impact remains a debate • The matters at hand are quite “technical/scientific”… • Situation varies strongly from one region / country to another • Economic crisis blurs reality in energy consumption evolution • End consumer energy pricing is complicated 26
Energy mix in EU major economies
27
(International ) politics • Long term thinking has never been a particular strength of politicians – neither is thinking beyond the local constituency • We are dealing with global issues, but we lack the international political instruments to tackle them • Need more international cooperation, but even at EU level there is no aligned energy policy • Energy is power to those who have it • Political “coloring” of energy issues (nuclear !) 28
Power generation in Belgium : all lights out ?
Ref : studie 2011 CREG (F)110616-CDC-1074
29
But what does the market expect ? €/MWh
55
Forward quotations Baseload - 10/09/2013
50
45
B D NL
40
F
35
30
Oct 13
Q4 2013
Cal 2014
Cal 2015
Cal 2016 Source: Platts 30
Surcharges for industry (Flanders – distribution)
31
Surcharges for industry (Flanders - transmission)
32
Plan Wathelet Plan Wathelet – major components • Nuclear phase-out • Tender for new capacity (CCGT / OCGT) • Lower charges for gas powered plants • Balancing reserves • Strategic reserve – “permit for closure” – Demand response
Febeliec position: tender for new capacity is “the bridge too far”: • Is combination gas / renewables the best choice ? • (additional) market distortion • discriminative • no European context 33
The way out … ?
34
The way out ? • There will not be “one solution” : it will be a combination of several existing and to be developed technologies / approaches • The core of the matter is technical, scientific and economic : a rational approach should prevail based on thorough research and analysis • Take it step by step, rather than setting long term not validated targets (continuous improvement) • Give priority to the most efficient steps - maintain a consistent strategy ( n° 1 : don’t waste energy) 35
The way out ? cont. • The challenge is world-wide – tackle with the appropriate means and at the right scale • It won’t come cheap and it won’t be easy : better intensify communication to gain public acceptance But … • Climate change will happen, better prepare for it • Power plays around energy will need containment
36
The way out ? cont. In practice this could mean, most likely … • Switching coal for (shale) gas, where possible • Reviewing mechanisms for CO2 reduction – needs to be global though … • Telling the truth, rather than setting irrational targets • It’s all in or all out : the EU in particular will not avoid climate change on its own ! Closing note : unfortunately the speaker is not able to give guarantees for the proposed remedies … but likes to thank the audience for their attendance and attention
37
Energy For Industry – An Eye on the Future 28
Wrap-up
Aldo Peeters Grontmij Belgium NV Head of Energy Discipline
“Beroep met toekomst: futuroloog” Kamagurka
Wrap Up 29
Cost of Climate Change
Wat als de roep om actie sterker wordt?
Wrap Up 30
Shale gas is game changer Maar
Waterverbruik
Milieurisico’s
Hoge depletion rate
De gemakkelijkste stukken eerst aangeboord
Prijsvoorspellingen zitten er doorgaans naast…
Wrap Up 31
A Review of EIA’s Annual Energy Outlook 2008Revised to Reflect Energy Independence & Security Act of 2007 Bill Hudson, March 7, 2008
Wrap Up 32
Wrap Up 33
Al belangrijke stappen gezet op het vlak van energie-efficiëntie… verder verbeteren vraagt vaak een andere kijk en doorgedreven benadering, met een bredere blik dan louter eenheid energie per geproduceerde hoeveelheid product
Wrap Up: Energiestudie van morgen 34
Geïntegreerde en gepersonaliseerde aanpak
Doorgedreven Efficiëntie − Nieuwe technieken en technologie − Grondige en kritische proces-analyse − Expertise
Flexibiliteit
Hernieuwbare energie
Samenwerking over de bedrijfsgrenzen
Energiemanagement in alle lagen
Samen met niet-energievectoren/aspecten
Oog voor duurzaamheid in functie van bedrijfsstrategie
Wrap Up 35
Smart Grids Flanders – 3 oktober 2013 36
Flexibiliteit moet je willen zien! (Joeri Uyttendaele, partner, EnerFlexy)
Beyond the common cold storage example: demand response in the US industry (Todd Krause, EnerNOC) Locatie: Grontmij Belgium, Stationsstraat 51, 2800 Mechelen
Energy For Industry – An Eye on the Future 37
Outlook
Patrick Van de Velde Grontmij Belgium NV Business Line Director Industry, Water & Energy “Als er iets is dat het verleden leert is het dit: ga door. Ga door en maak van de toekomst nog meer verleden.” Herman Brusselmans
Grontmij | innovaties 38
Grontmij, de eerste BREEAM-assessor en -adviseur in Europa
Winnaar Industrie Technisch Management Award 2010, DuPont, inventieve Transportsystemen
Grontmij hoofdkantoor wint Belgische Prijs voor Energie
Winnaar Industrie Technisch Management Award 2011, EVAL Europe, meest energie-efficiënte EVOH-kunsthars productiesite ter wereld
BEDANKT 39