DAFTAR PUSTAKA AbuShaaban, Mohammed Sufian. 2012. Wastes Elimination as the First Step for Lean Manufacturing "An Empirical Study for Gaza Strip Manufacturing Firms". Business Administration Thesis.The Islamic University of Gaza. Andini, Ganis, 2012. Pendekatan Konsep Lean Manufaktur Dalam Peningkatan Efisiensi Pada Sistem Produksi Kaca Di PT. ASAHIMAS FLAT GLASS, Tbk. Jurnal Teknik Pomits. Vol. 1, No. 1, (2012) 1-5 Batubara, Sumiharni. 2011. Penerapan Konsep Lean Manufacturing Untuk Meningkatkan Kapasitas Produksi (Studi Kasus : Lantai Produksi PT. Tata Bros Sejahtera). Jurnal Teknik Industri. ISSN:1411-6340. Chakraborttya, Ripon Kumar. 2010. Study and Implementation of Lean Manufacturing in a Garment Manufacturing Company: Bangladesh Perspective. Journal of Optimization in Industrial Engineering. Vol. 7 pp 11-22. Edosomwan, J.A., 1995. Integriting Productivity and Quality Management., 2nd Edition. Marcel Dekker, Inc. pp 27-65 Efran, Osama.M. 2010. Application of Lean Manufacturing to Improve the Performance of Health Care Sector in Libya. International Journal of Engineering & Technology IJET-IJENS Vol:10 No:06 pp 110-120 El-Namrouty, Khalil A. 2013. Seven Wastes Elimination Targeted By Lean Manufacturing Case Study “Gaza Strip Manufacturing Firms’’. International Journal of Economics, Finance and Management Sciences. Pp 68-80 Gaspersz, Vincent., 2012. Production and Inventory Management. Vinchristo Publication. Giro, Roberto, 2013. Lean Manufacturing and Business Performance in Brazilian Firms. Journal Moori Universidade Presbiteriana Mackenzie. Kenichi Sekine, 1992, One Piece Flow : Cell Design For Transforming The Production Process, Cambridge, Mass : Productivity Press. Kumar, Naveen., Sanjay Kumar., Abid Haleem., & Pardeep Gahlot. 2013. Implementing Lean Manufacturing System. Journal of Industrial Engineering and Management. Vol. 6(4): 996-1012 – ISSN: 2013-0953. Kurniawan, Dhani, 2012, Usulan Peningkatan Produktivitas Production Line dengan Pendekatan Value Stream Mapping (VSM), Tesis (tidak diterbitkan) Universitas Mercu Buana. Jakarta. Liker, Jeff., 2004, The Toyota Way, Mc. Graw-hill Company.
75
http://digilib.mercubuana.ac.id/
76
Marudhamuthu, Ravikumar, 2011. The Development and Implementation of Lean Manufacturing Techniques in Indian Garment Industry. Jordan Journal of Mechanical and Industrial Engineering. Volume 5, ISSN 1995-6665 Pages 527 – 532. Mughni, Ahmad, 2011. Penaksiran Waste Pada Proses Produksi Sepatu dengan Waste Relationship Matrix. Tesis - Universitas Trunojoyo Madura. Nuruddin, Abdul Wahid, 2013. Implementasi Konsep Lean Manufacturing Untuk Meminimalkan Waktu Keterlambatan Penyelesaian Produk ”A” Sebagai Value Pelanggan (Studi Kasus PT. TSW (Tuban Steel Work). Jurnal Rekayasa Mesin. Vol.4, No.2 pages: 147-156 Ohno dalam Hicks et al., (2004). Just In Time dalam Sistem Produksi Toyota. Diterjemahkan oleh Edi Nugroho, Jakarta, Purtaka Binaman Pressindo Oliveira, Clênio Senra de, 2008. Lean Manufacturing Paradigm In The Foundry Industry (O Paradigma Da Manufatura Enxuta Na Indústria De Fundição), Estudos Tecnologicos Journal Vol. 4 pp 218-230. Paneru, Naresh, 2011. Implementation of Lean Manufacturing Tools in Garment Manufacturing Process Focusing Sewing Section of Men’s Shirt. Thesis. Oulu University. Rakhmawati. 2011, Identifikasi Waste pada Whole Stream Perusahaan Rokok PT. X16. Jurnal Argointek No.1. pages 16-27. Roger, Jhon., Amrik Sohal. 2013. A Conceptual Model for the successful deployment of Lean Six Sigma. International Journal of Quality & Reliability Management Vol. 29 No. 1, 2012 pp. 54-70. Slack, Nigel., Michael Lewis. 2008. Operation Strategy. Pearson Education Limited. pp 270-271. Singh, Gundeep. 2012. Lean Manufacturing Implementation in the Assembly shop of Tractor Manufacturing Company. International Journal of Innovative Technology and Exploring Engineering (IJITEE) ISSN: 2278-3075, Volume1, Issue-2. pp 71-74. Teresko, John. 2014. How to Organize for Lean/Six Sigma. Trade Journal Penton Business Media.
http://digilib.mercubuana.ac.id/
77
Lampiran 4. Data mesin yang digunakan dalam melakukan proses produksi di PT. Asia Dwimitra Industri No 1
Area
Nama Mesin
Cutting/Preparation CT. Swing Arm
Jumlah (Unit) 3
2
CT. Beam
6
3
Buffing
1
4
Matrix Skiving
2
5
Grinding
1
6
Solder
1
7
Press Fussing
2
8
Press Size Label
1
9
Roll Hot Melt
4
10
Dot Rolling
3
11
2 Side Folded
1
12
Spray M/C
1
13
Post 1 Needle
13
14
Post 2 Needle
7
15
Flat 1 Needle
9
http://digilib.mercubuana.ac.id/
78
16
Siruba
1
17
Comp.Stitching
9
18
Tbl Scr
3
19
Stitching
Post 1 Needle
20
Post 2 Needle
21
Comp.Stitching
22
Roll Hot Melt
23
Spray
24
Pounching
25
Table
8 2 2 1 1 1 11
26 Assembling
Gathering M/C
27
Heel Activator
28
Back Part Molding
29
Stroble M/C
30
Upper Conditioner
31
Toe Box Activator
32
Insert/Slip Laste
33
Heel Heater
34
Heel Last
35
Heat Setter Chamber
36
Gauge Marking
37
Hand Grinding
38
Cvy/chamber cementing
39
Press Universal
40
Chiller
41
Open Laste
http://digilib.mercubuana.ac.id/
1 2 2 2 1 1 2 1 1 1 2 3 1 1 1 1
79
42
Bruhing Laste
43
Hot Melt Roll
44
Press Sockliner
45
Metal Detector
46
Table
47
shoe Lace Tighten
1 1 1 1 6 2
129 Total Mesin (Sumber : Departemen Industrial Engineering PT. Asia Dwimitra Industri, 2104)
http://digilib.mercubuana.ac.id/