PT PJB UBJ O&M PLTU PACITAN PJB INTEGRATED MANAGEMENT SYSTEM FORMULIR LAPORAN HARIAN PRODUKSI
Hari, tanggal : RABU,
6
No. Dokumen Tanggal Terbit Revisi Halaman
: FMN-17.1.1.22 : 18 April 2012 : 01 : 1
AGUST 2014
UNIT #1
UNIT I BEBAN MAX
1.2 1 0.8 0.6 0.4 0.2 0
0.0
MW
0.0
MW
######
MW
BEBAN MIN
00:00 00:30 01:00 01:30 02:00 02:30 03:00 03:30 04:00 04:30 05:00 05:30 06:00 06:30 07:00 07:30 08:00 08:30 09:00 09:30 10:00 10:30 11:00 11:30 12:00 12:30 13:00 13:30 14:00 14:30 15:00 15:30 16:00 16:30 17:00 17:30 18:00 18:30 19:00 19:30 20:00 20:30 21:00 21:30 22:00 22:30 23:00 23:59
BEBAN RATA2
ROH
MW GROSS
MVAR GROSS
coal flow
UNIT #2
UNIT II BEBAN MAX
174.8
MW
BEBAN MIN
165.9
MW
BEBAN RATA2
171.4
MW
00:00 00:30 01:00 01:30 02:00 02:30 03:00 03:30 04:00 04:30 05:00 05:30 06:00 06:30 07:00 07:30 08:00 08:30 09:00 09:30 10:00 10:30 11:00 11:30 12:00 12:30 13:00 13:30 14:00 14:30 15:00 15:30 16:00 16:30 17:00 17:30 18:00 18:30 19:00 19:30 20:00 20:30 21:00 21:30 22:00 22:30 23:00 23:59
200 150 100 50 0 -50
ROH
MW GROSS
MVAR GROSS
Coal flow
INFORMASI PRODUKSI KWH, KVARH UNIT #1 NO
PARAMETER CHECK
UNIT #2 VALUE
UNIT
00:00
NO
10:00
PARAMETER CHECK
VALUE
UNIT
00:00
1
TOTALIZER KWH GROSS
kWh
1,134,616,000
1
TOTALIZER KWH GROSS
kWh
80,972,000.00
2
TOTALIZER KVARH GROSS
kVarh
239,060,000
2
TOTALIZER KVARH GROSS
kVarh
3,234,000.00
3
PRODUKSI KWH NETTO
kWh
503,083,640
3
PRODUKSI KWH NETTO
kWh
545,717,056.00
4
PRODUKSI KVARH NETTO
kVarh
123,466,360
4
PRODUKSI KVARH NETTO
kVarh
49,831,640.00
5
TOTALIZER UAT KWH
kWh
21,542,600
5
TOTALIZER UAT KWH
kWh
5,639,700.00
6
TOTALIZER UAT KVARH
kVarh
-
6
TOTALIZER UAT KVARH
kVarh
7
TOTALIZER HSD SUPPLY
Ton
69,565.438
7
TOTALIZER HSD SUPPLY
Ton
8
TOTALIZER HSD RETURN
Ton
61,947.379
8
TOTALIZER HSD RETURN
Ton
113,969.49
9
TOTALIZER COAL FEEDER A
kg
4,025,695
9
TOTALIZER COAL FEEDER A
kg
247,493,150
10
TOTALIZER COAL FEEDER B
kg
83,584,330
10
TOTALIZER COAL FEEDER B
kg
152,192,350
11
TOTALIZER COAL FEEDER C
kg
69,684,405
11
TOTALIZER COAL FEEDER C
kg
277,091,835
12
TOTALIZER COAL FEEDER D
kg
241,121,910
12
TOTALIZER COAL FEEDER D
kg
13
TOTALIZER COAL FEEDER E
kg
206,782,540
13
TOTALIZER COAL FEEDER E
kg
240,532,280
14
COAL ACCUMULATION
kg
564,790,500
14
COAL ACCUMULATION
kg
803,987,700.0
15
TOTALIZER MAKE UP WATER
Ton
15
TOTALIZER MAKE UP WATER
Ton
TOTALIZER SST KWH
kWh
91,588,952
TOT HSD SUPPLY AUX BOILER
ton
TOTALIZER SST KVARH
kVarh
71,823,280
TOT HSD RETURN AUX BOILER
ton
10:00
104,811.29
292,624,370
15,345.50
INFORMASI STOK BAHAN BAKAR DAN AIR NO
PARAMETER CHECK
UNIT
VALUE 0:00
6:00
14:00
( mm,ton )
2
LEVEL RAW WATER RESERVOIR 2
( mm,ton )
0
0
0
3
LEVEL DEMIN TANK #1
( mm,ton )
0
0
0
4
LEVEL DEMIN TANK #2
5
LEVEL HSD TANK #1
0
0
NO
21:00
LEVEL RAW WATER RESERVOIR 1
1
0
SUPLIER BATUBARA
1
PLN BB
0
2
BA
0
3
0
PENERIMAAN
PEMAKAIAN
STOCK
5,395.30
-
20,621.482
-
51,887.583
KPC
0.05
55,212.967 43,870.441
( mm,ton )
0
0
0
0
4
ART
2,668.06
(DCS)
( ton,liter )
0
0
0
0
5
DGL
-
-
SOUNDING
( mm,liter )
0
0
0
0
6
KDC
-
22,821.232
(DCS)
( ton,liter )
0
0
0
0
7
SOUNDING
( mm,liter )
0
0
0
0
TOTAL
2,668.11
194,413.705
6
LEVEL HSD TANK #2
7
LEVEL HSD EDG #1
( mm,ton )
Coal Bidding Yard #1
8
LEVEL HSD EDG #2
( mm,ton )
Cukup Untuk (x) Hari Operasi
5,395.30
45,996.85 18.46
:
KONDISI MAIN UNIT, BOP, & ALAT BERAT PARAMETER CHECK
NO
Kondisi Pembangkit #1 Beban M Steam Press;Temp;Flow 1
UNIT OF MEASUREMENT
6:00
Status
14:00
21:00
FYI
MW Mpa;°C;t/h
Mode Operasi Mill Inservice
A/B/C/D/E
Mill tidak standby
A/B/C/D/E
Oil Gun Inservice Vacuum Condensor Kondisi Pembangkit #2 Beban M Steam Press;Temp;Flow 2
Pa Status
OPERASI
MW
175
Mpa;°C;t/h
10.5 / 532 / 547 BASE MODE
Mode Operasi Mill Inservice
A/B/C/D/E
Mill tidak standby
A/B/C/D/E
A/C/D B/D
Pa
95100
-
Oil Gun Inservice Vacuum Condensor
Status
OPERASI
Unit
1/2
1
Total produksi
ton
MED 3
MIXED BED #1/#2 4
Unit Total produksi
5
Auxiliary Boiler Konsumsi HSD Aux. Boiler CHLORINATION PLANT
6
Unit
/
TSB
/
2
/
/
1
/
2
1
/
2
2
1
/
2
1
/
2
2
1
/
2
1
/
813.9
Status
STANDBY
1/2
1
STANDBY
/ 573.96
ton Status
STANDBY
ton Status
OPERASI
/
1/2
1
/
/
/
2
LAPORAN HARIAN PRODUKSI
PT PJB UBJ O&M PLTU PACITAN PJB INTEGRATED MANAGEMENT SYSTEM FORMULIR LAPORAN HARIAN PRODUKSI
Hari, tanggal : RABU, 6
t/h
Flow Current
/
TSB
Unit
1
/
2
Purrity
%
/
2
/
1
/
2
2.07/1.65/0.68
Mpa #1
LOADING KE COAL BUNKER COAL BUNKER A
meter
COAL BUNKER B
meter
COAL BUNKER C
meter
COAL BUNKER D
meter
COAL BUNKER E
meter
JENIS BB
LEVEL
KPC KPC KPC KPC KPC
2.6
JAM
#2 JENIS BB
0 0 0
06.00
0
#1 LEVEL
ART KPC ART ART KPC
ton
TOTAL
JENIS BB
LEVEL
JAM
#2 JENIS BB
#1 LEVEL
JENIS BB
LEVEL
JAM
#2 JENIS BB
LEVEL
11.5 0 10.2 11.6
14.00
21:00
2.6
1361 STANDBY
9
Ship Unloader (SU)
10
Stacker Recklaimer (SR) Fuel Oil Pump ( FOP )
Status Status
Inservice Alat Berat Excavator
A/B/C
A
Status
STANDBY
Wheel Loader
Status
11
/
1
%
Press. H2 Tank 1/2/3 COAL HANDLING SYSTEM
8
2
AGUST 2014
2065 STANDBY
1/2
O2 Containt
: FMN-17.1.1.22 : 18 April 2012 : 01 :
26/30
Ampere Status
H2 plant 7
6
No. Dokumen Tanggal Terbit Revisi Halaman
OPERASI OPERASI
jam 12
TSB
jam Buldozer
Status
13
EDG #1
Status
TSB
14
EDG #2
Status
STANDBY
STANDBY
jam
AKTIFITAS PRODUKSI UNIT #1
JAM A1( 22.30 - 07.30 )
UNIT# 2
JAM A1( 22.30 - 07.30 )
22.30 Serah terima dengan shift D
fyi
COMMON / BOP
JAM A1( 22.30 - 07.30 )
22.30 Serah terima dengan shift D
22.30 Serah terima dengan shift D
Load
: 175 MW
Mode Operasi
: Manual
chcb
MS P/T/F
: 10.4 Mpa / 531 °C / 552 t/h
> patrol chek
RH P/T
: 1.9 Mpa / 533 t/h
> direct unloading
FW Flow
: 503 t/h
>unloading finish : 5395.3 ton
Mill Inservice
: A, C, D
> loading to bunker via sr ( 1065.8 ton )
Coal Flow
: 110 t/h
Air Flow
: 1166 t/h
Cond vacump
: -95 kPa
CBD
:0%
nb : coal plugh c6a ( 2#d ) masih bocor FLY ASH > patrol check dan pyrite mill
07.00 Temperature carbon brush tertinggi A5 = 109 *C
> level fly ash silo #1 : #2 : > level bottom ash #1 : #2 : MED > patrol check > pemakaian demin water 374.78 ton
02.08 > MIX BED B stop, level penuh 06.30 > MIX BED B // > H2 #1 status sb by mesin
CWP > patrol check
B2 (07.30 - 15.30)
B2 (07.30 - 15.30) 07.30 Serah terima dengan shift A Load : 175 MW Mode Operasi : Manual MS P/T/F : 12.1 Mpa / 530 °C / 559.6 t/h RH P/T : 2.09 Mpa / 526 t/h FW Flow : 521.7 t/h Mill Inservice : A, C,D Coal Flow : 111.5 t/h Air Flow : 1049 t/h Cond vacump : -95 kPa CBD :0%
B2 (07.30 - 15.30) CHCB > patrol check > alat berat operasi exca dan dozer 09.00 > Pengechekan C7 oleh M2 , rendal dan cina NB : - returt headler tail pulli tidak berputar - Beberapa rolling c7 bearingnya rusak - posisi conveyor tidak center 10.00 C7 // cleaning bb di conveyor Unloading direct to bunker ( 1126 T) Unloading sementara 4442 T
LAPORAN HARIAN PRODUKSI
PT PJB UBJ O&M PLTU PACITAN PJB INTEGRATED MANAGEMENT SYSTEM FORMULIR LAPORAN HARIAN PRODUKSI
Hari, tanggal : RABU,
6
No. Dokumen Tanggal Terbit Revisi Halaman
: FMN-17.1.1.22 : 18 April 2012 : 01 : 3
AGUST 2014
KETERANGAN/DATA/FOTO/LAIN-LAIN TTD SPV. SHIFT Shift Malam (22:30 sd. 07:30)
Shift Pagi (07:30 sd. 15:30)
Shift Sore (15:30 sd. 22:30)
LAPORAN HARIAN PRODUKSI
Unit I
00:00 00:30 01:00 01:30 02:00 02:30 03:00 03:30 04:00 04:30 05:00 05:30 06:00 06:30 07:00 07:30 08:00 08:30 09:00 09:30 10:00 10:30 11:00 11:30
MVAR
MW
ROH Gross Netto Gross
4
Netto Coal flow (t/h)
Unit I
12:00 12:30 13:00 13:30 14:00 14:30 15:00 15:30 16:00 16:30 17:00 17:30 18:00 18:30 19:00 19:30 20:00 20:30 21:00 21:30 22:00 22:30 23:00 23:30
MVAR
MW
ROH Gross Netto Gross Netto Coal flow (t/h)
Unit II
00:00 00:30 01:00 01:30 02:00 02:30 03:00 03:30 04:00 04:30 05:00 05:30 06:00 06:30 07:00 07:30 08:00 08:30 09:00 09:30 10:00 10:30 11:00 11:30
MVAR
MW
ROH Gross
174.3
170.1
Netto
163.1
158.2
Gross
-10.4
-15.8
174.1
174.6
-10.5
-16.8
Netto
-30.4
-34.9
-32.9 -36.1
Coal flow (t/h)
111.7
110.9
111.5
Unit II
169.6
169.7
169.5
169.6
169.7
165.9
170.6
170.7
174.8
172.4
174.7
162.6 163.2 157.9 158.1 157.9 157.8 158.4 154.5 158.9 159.6 162.9 160.5 163.1
109.1
-21.3
-25.7
-24.7
-25.1
-24.6
-17.6
-3.3
8.6
4.5
-14.9
-17.2
-40 -45.2 -44.8 -45.8 -43.6 -35.9 -23.9 -10.4 -15.8 -34.2 -37.1 110.2
109.8
110.0
110.0
109.5
109.1
109.6
108.4
109.3
109.6
109.4
12:00 12:30 13:00 13:30 14:00 14:30 15:00 15:30 16:00 16:30 17:00 17:30 18:00 18:30 19:00 19:30 20:00 20:30 21:00 21:30 22:00 22:30 23:00 23:30
MVAR
MW
ROH Gross Netto Gross Netto Coal flow (t/h)
LAPORAN HARIAN PRODUKSI
PT PJB UBJ O&M PLTU PACITAN PJB INTEGRATED MANAGEMENT SYSTEM FORMULIR IKHTISAR LAPORAN PENGUSAHAAN
No. Dokumen
: FMN-17.1.1.23
Tanggal Terbit
: 18 April 2012
Revisi
: 00
Halaman
: 5
Hari, tanggal :
UNIT
KAPASITAS MW
Produksi Gross Mwh Harian komulatif 0.0 0.0 4177.0 21092.0 4177.0 21092.0
Gross DMN #1 315.0 280.0 #2 315.0 280.0 TOTAL 630 560
Produksi Netto Mwh Harian komulatif 0.0 0.0 3859.4 19543.7 3859.4 19543.7
Harian 0.0 307.0 307.0
Daya Terakhir Load (MW) (06:00 WIB) Coal Flow (T/H) Mill Operasi Mill tidak stand by A B C D E
Operasi Dengan Batubara
UNIT
PH
PLTU #1 PLTU #2 Total
0 175 0 109 A/C/D 0 B/D MRC LRC MRC MRC MRC LRC MRC LRC MRC MRC
120.0 120.0 240
Harian 24.0 24
AGUST
28.8
2014
Pemakaian HSD Harian komulatif 0.0 0.0 0.0 0.0 0.0 0.0
132.3
Pemakaian Batubara Harian komulatif 0.0 0.0 2668.1 13135.9 2668.1 13135.9
Harian 0.00 0.00 0.00
SFC HSD komulatif 0.0 0.0 0.0
Harian 0.00 0.64 0.64
SFC BB komulatif 0.00 0.62 0.62
PARAMETER OPERASI UNTUK PERHITUNGAN INDIKATOR OPERASI (KOMULATIF 1 SAMPAI HARI INI) Jam OMC Jam tidak Tersedia Jam Derating FO_OMC FOH MOH POH EFDH EMDH EPDH komulatif Harian komulatif Harian komulatif Harian komulatif Harian komulatif Harian komulatif Harian komulatif Harian - 24.0 24.0 96.0 120.0 - 10.1 49.5 120 24 96 49 24 10 -
Jam Tersedia
#2 175.0 169.2 174.0
5
PRODUKSI SST Mwh Harian komulatif
PS Mwh komulatif 0.0 1543.1 1543.1
KONDISI MAIN UNIT #1 Load Max (MW) 0.0 Daya Load Min (MW) 0.0 Load Average (MW) 0.0 Make-up Water (m3)
SELASA,
SH komulatif
INDIKATOR-INDIKATOR OPERASI SESUAI KONTRAK KINERJA TAHUN 2014 (KOMULATIF 1 SAMPAI HARI INI) NPHR (kCal/kg) Harian komulatif #DIV/0! #DIV/0! 2,903.60 1,136.38 2,903.60 1,136.38
UNIT PLTU #1 PLTU #2 Total
GPHR Net Capacity Net Output Faktor (kCal/kg) (%) (%) Harian komulatif Harian komulatif Harian komulatif #DIV/0! #DIV/0! - ##### #DIV/0! 2,682.81 1,052.96 57.4 58.17 57.43 58.17 2,682.81 1,052.96 28.7 14.54 29.08 28.7
sDof (kali) KONKIN : 5 kali komulatif
Harian
EAF (%) EFOR (%) SOF (%) KONKIN : 83.27 % KONKIN :4.26 % KONKIN : 12.60 % komulatif Harian komulatif Harian komulatif (60.0) 400.0 58.8 42.0 41.2 (0.6) 42.0 41.2 400.0 -
Harian 100 58 29
REALISASI PEMBEBANAN UNIT ROH #1 ROH #2
1:00 0 0 175 175
PLTU #1 PLTU #2 Total
2:00 0 0 174 174
3:00 0 0 175 175
4:00 0 0 170 170
5:00 0 0 170 170
6:00 0 0 174 174
7:00 0 0 175 175
8:00 0 0 175 175
9:00 0 0 174 174
INFORMASI STOCK BAHAN BAKAR Jenis Batubara
Penerimaan
PLN BB BA KPC ART DGL KDC
Stock
5,395.30 -
Raw Water Reservoir 1 Reservoir 2
level
Stock
INFORMASI STOCK AIR Volume (m3) Demin Water 4892.6952 Tank 1 4950.2691 Tank 2 9842.9643 Total
level (m) 4504 4557 Total
Level (m) 11038 0
Drt ke-
604 180
1 2 3 4 4 5 6 7 TOTAL DERATING
Volume (m3) 1464.35627 0 1464.35627
UNIT
#1
OPERASI
#1
#2
STANDBY
#2 - #2
#1
TSB 2,287.44
m3 STANDBY m3 399.75
EFOR
Total Drt Ke Jam Beban 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
NCF
24 24
DERATING #2 Equip ment
Drt 0 0 0 0 0 0 0 0 0
Type Drt
Drt ke-
Jam awal
Jam akhir
1 2 3 4 4 5 6 7 TOTAL DERATING
Total Drt Ke Jam Beban 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Equip ment
Drt 0 0 0 0 0 0 0 0 0
EVALUASI PENCAPAIAN NPHR (HARIAN & KUMULATIF 1 SAMPAI HARI INI) ALASAN
PENCAPAIAN
PLTU #2 SOF
24 24
#2
Aux Boiler STANDBY EDG #1 TSB #2 STANDBY H2 #1 STANDBY #2 TSB 2.07/1.65/0.68 Press Ves 1/2/3 Chlorint#1 #2
PLTU #1 EAF
Jam akhir
Shutdown (jam)
#1
UNIT COMMON MED Total Produksi WTP Total Produksi Total Konsumsi
Jam awal
Type Drt
Operasi
174 174
DERATING #1
HSD Tank
20,621.48 Tank 1 4253 51,887.58 Tank 2 1270 55,212.97 Penerimaan 43,870.44 Total stock - cukup untuk (x) kali cold start up 22,821.23 cukup untuk (x) kali Warm start up 46,000 cukup untuk (x) kali Hot start up 148,413.71 cukup untuk (x) kali Very Hot start up 18.46
COAL BEDDING TOTAL STOCK EFEKTIFE CUKUP UNTUK (X) HARI OPERASI
rata-rata
10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 24:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 175 175 175 174 175 175 175 175 175 174 174 174 175 175 175 175 175 175 174 175 175 175 175 175 174 174 174 175 175 175
EAF
EFOR
SOF
NCF
58.78 41.22
58.17
PLTU Pacitan EAF
EFOR
SOF
NCF
100.00
0.00 - 0.00
Hari ini
0.00
57.98 42.02
0.00
Kumulatif Bulanan
Hari ini
-60.00
No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Unit
Peralatan
57.43
Jenis Kerusakan
Kumulatif Bulanan
42.02 28.99
41.22 28.72 14.54 -
Hari ini
PERALATAN YANG PERLU MENDAPATKAN PERHATIAN KHUSUS (POTENSI TRIP ATAU DERATING) Penyebab Status No. Service Request
-0.61 Kumulatif Bulanan
Keterangan
LAPORAN HARIAN PRODUKSI
: FMN-17.1.1.23 : 18 April 2012
6
PRODUKSI SFC BB komulatif 0.00 0.62 0.62 PARAMETER OPERASI UNTUK PERHITUNGAN INDIKATOR OPERASI (KOMULATIF 1 SAMPAI HARI INI) Jam Derating EPDH komulatif INDIKATOR-INDIKATOR OPERASI SESUAI KONTRAK KINERJA TAHUN 2014 (KOMULATIF 1 SAMPAI HARI INI) SOF (%) KONKIN : 12.60 % komulatif 400.0 400.0
EVALUASI PENCAPAIAN NPHR (HARIAN & KUMULATIF 1 SAMPAI HARI INI) ALASAN
PERALATAN YANG PERLU MENDAPATKAN PERHATIAN KHUSUS (POTENSI TRIP ATAU DERATING) Keterangan
LAPORAN HARIAN PRODUKSI
PT. PEMBANGKITAN JAWA BALI
No. Dokumen : LR-FM-AD-407
UBJ O&M PACITAN MANAGEMENT SYSTEM
Tanggal Terbit : 1 April 2011
MONITORING HARIAN PEMBANGKIT Hari, tanggal :
SELASA,
5 AGUST
KONDISI MAIN UNIT PLTU PACITAN Daya
Unit 1
Unit 2
315.0
315.0
Mampu (Netto)
280.0
280.0
Load (MW)
0
Coal Flow (T/H)
0
109 -
Mill Tidak Stanby Operasi Dengan Batubara
PEMAKAIAN BAHAN BAKAR HSD Pemakaian Unit 1 Unit 2 -
STOCK AIR Raw Water Reservoir 1 Reservoir 2 Total EAF 100.00
SOF
0.00 - 0.00 Hari ini
0
B/D
MRC
LRC
-
Tank 1 Tank 2
Stock (Level) 4,253.00 1,270.00 Stock Gross
Stock Efektife
194,413.71
148,413.71
SFC HSD Unit 1 Unit 2
NCF
EFOR
28.72 -
Hari ini
NO 1 2 3 4 5
NO 1 2 3 4 5
UNIT
Keterangan Stock Total (L) : 1,077,025.63
46,000
PLTU #1
EAF
EFOR
PERALATAN
Level (m) 11038 0
SOF
Cukup untuk 18.46
SFC BATUBARA Unit 1 Unit 2 0.64
-
Volume (m3) Demin Water 4892.6952 Tank 1 4950.2691 Tank 2 9842.9643 Total
NCF
Volume (m3) 1464.35627 0 1464.35627
PLTU #2
58.17 57.98 57.43 58.78 42.02 41.22
0.00 0.00
42.02
4177.0 21092.0 3859.4 19543.7
Coal Beading
-
Hari ini
28.99
Unit 2
0.0 0.0 0.0 0.0
5,395
Kumulatif Bulanan -60.00
EAF
Unit 1
Penerimaan
level (m) 4504 4557
EFOR
7
A/C/D
Penerimaan
Batubara Pemakaian Unit 1 Unit 2 2,668.11 Suplier Batubara Pakai Unit 1 Unit 2 ART, PLN BB
: 1 dari 1
Produksi Gross Komulatif Netto Komulatif
175
Mill Operasi
:0
Halaman
2014
Terpasang (MW)
Daya Terakhir (06:00)
Revisi
SOF
-
Kumulatif Bulanan
PLTU Pacitan
NCF
41.22 14.54 -0.61 Kumulatif Bulanan
JENIS KERUSAKAN
PERALATAN YANG PERLU MENDAPATKAN PERHATIAN KHUSUS (POTENSI TRIP ATAU DERATING) PERALATAN JENIS KERUSAKAN UNIT
LAPORAN HARIAN PRODUKSI
8
COAL FEEDER
0:00 UNIT 1
6:00 UNIT 2
UNIT 1
14:00 UNIT 2
A (MT)
4,025.695
247,493
4,025.695
247,613.920
B (MT)
83,584.330
152,192
83,584.330
152,192.350
C (MT)
69,684.405
277,092
69,684.405
277,358.300
D (MT)
241,121.910
292,624
241,121.910
292,898.915
E (MT)
206,782.540
240,532
206,782.540
240,532
TOTAL PEMAKAIAN STOCK
662
UNIT 1
18:00 UNIT 2
(1,815,795) 147,755.077
UNIT 1
21:00 UNIT 2
0 1,963,549.722
UNIT 1
UNIT 2
0 1,963,549.722
1,963,549.722
LAPORAN HARIAN PRODUKSI