Kwaliteitsgarantie bij bereidingen
Een cleanroom bouwen is meer dan alleen maar een plan Mario Don Porto Carero – Senior Principal Engineer HVAC
Delivering Innovative Solutions
Is dit een goed plan ?
Is dit een goed plan ? Evaluatie adhv PIC‟s PE010-3 3 Premises and equipment 3.2 General requirements -
Appropriately designed, … ,suitable for the intended activities,… ,appropriate segregation of activities,…
-
Reduce risk of (cross-)contamination, design should enable thorough cleaning/desinfection
-
Pest control
-
Environmental conditions (temperature, humidity, light) … should be defined and monitored
Is dit een goed plan ? Wat ben je van plan ?
appropriate segregation of activities
Is dit een goed plan ? Wat ben je van plan ?
Reduce risk of contamination Reduce risk of cross contamination
PIC/S PE 010-3 : -
Adequate segregation from other activities Avoid cross-contamination
6
PIC/S PE 010-3 : Adequate segregation from other activities Avoid cross-contamination PB-OEL 1
Norms 2010 P O N
-
2
3A
3B
4
Design Group Design Group N-I N-II Design Group Design Group O-I O-II Design Group Design Group P-I P-II
7
Voorbeeld aanpassing Chemische Productie CNC lokaal -
-
Appropriately designed, … ,suitable for the intended activities,… ,appropriate segregation of activities,… Reduce risk of (cross-)contamination, design should enable thorough cleaning/desinfection
8
PIC/S PE 010-3 : guide to good practices for the preparation of medicinal products in healthcare establishments
3 Premises and equipment 3.2 General requirements -
Appropriately designed, … ,suitable for the intended activities,… ,appropriate segregation of activities,… Reduce risk of (cross-)contamination, design should enable thorough cleaning/desinfection Pest control Environmental conditions (temperature, humidity, light) … should be defined and monitored
9
PIC/S PE 010-3 : Reduce risk of (cross-)contamination, design should enable thorough cleaning/desinfection • Gowning (en PBM’s)
• Selectie materialen en afwerking - resistentie reinigingsmiddelen, oppervlaktes, naden, … -
Pest control
10
PIC/S PE 010-3 : Reduce risk of (cross-)contamination, design should enable thorough cleaning/desinfection • Contaminatie van buiten via lucht(groep) Selectie type (HEPA-) filters in pulsie (en extractie) Positie aanzuig (uitlaat motoren, gras maaien, terroristische aanval, invloed extracties…) • (cross-) Contaminatie naar buiten via lucht(groep)
Selectie type (HEPA-) filters in extractie (en pulsie) Safe change (bag in / bag out) nodig ? Afbakening zone rond uitlaat ? Hoe veilig onderhouden van bv extractie ventilatie ? 11
PIC/S PE 010-3 : Environmental conditions (temperature, humidity, light) … should be defined and monitored Te koud
Te warm
Product garanderen van kwaliteit - Garanderen van kwaliteit vermijden risico voor patiënten Process and Process equipment - Garanderen van goede werking toestellen (variaties) vermijden risico voor patiënten Environment / cleanliness level - Vermijden buitensporige groei van micro-organismen vermijden risico voor patiënten Comfort - Vermijden fouten door discomfort vermijden risico voor patiënten
12
PIC/S PE 010-3 : -
Environmental conditions (temperature, humidity, light) … should be defined and monitored
DESIGN CRITERIA CONTROL TOLERANCE ALERT LIMIT
ALERT LIMIT DESIGN LIMIT
PRODUCT LIMIT
DESIGN LIMIT
SETPOINT RANGE (DEADBAND)
PRODUCT LIMIT
ALERT (MAINT.) RANGE PRODUCT RANGE USER REQUIREMENTS
13
PIC/S PE 010-3 : -
Storage conditions (temperature, relative humidity) should be specified and monitored.
14
Wat ben je van plan ? Documenteer je keuzes… Voorbeeld PPURS/GURS
Wat ben je van plan ? Documenteer je keuzes… Voorbeeld risico assessment
Referenties Ontwerpen van Cleanrooms EN ISO 14644-4 : cleanrooms and associated controlled environments : Design, construction and start-up
ISPE baseline guide volume 2 OSD manufacturing ISPE baseline guide volume 3 Sterile manufacturing ISPE good practice guides engineering, maintenance, HVAC, … (zie “puplications” op ISPE website)
Belgium Cleanroom Workclub www.BCW.be ISPE www.ISPE.org
Samenvatting Is dit een goed plan ? Wat ben je van plan ?
Product en Process vereisten
Systeem vereisten
• Kwaliteit product
• Veiligheid(IH&S) gebruiker
• Risico patient
• Life cycle cost • Integratie in bestaande systemen
Ontwerp conform de vereisten • Lokaalinformatie fiche • Lay out plannen (gmp zone, flows3, ..) • Schematische voorstelling systemen
Aantonen dat je doet wat je van plan was ?
Ontwerp conform de vereisten Product en Process vereisten
Systeem vereisten
• Lokaalinformatie fiche • Lay out plannen gmp zone, flows3, • Schematische voorstelling systemen
Gebouwd volgens plan?
Uitbating volgens plan ?
• Installatie verificatie specificatie identificatie certificaten veiligheid ergonomie
• • • • • • • •
Procedures Opleiding (toegang) Monitoring (data) Behandeling afwijkingen Onderhoud Trending Energie(rekening) Feed back
PIC/S PE 010-3 : guide to good practices for the preparation of medicinal products in healthcare establishments
3 Premises and equipment 3.2 General requirements -
Appropriately designed, … ,suitable for the intended activities,… ,appropriate segregation of activities,…
Identificatie producten (vermijden mix-ups, quarataine, …) Procedures
3.4 Storage Area - Sufficient capacity, various categories - Storage conditions (temperature, relative humidity) should be specified and monitored.
20
PIC/S PE 010-3 : -
Storage conditions (temperature, relative humidity) should be specified and monitored.
21
PIC/S PE 010-3 : guide to good practices for the preparation of medicinal products in healthcare establishments
4 Documentation 4.2 General requirements -
Specifications Instructions Records Procedures
22
PIC/S PE 010-3 : guide to good practices for the preparation of medicinal products in healthcare establishments
ANNEX 1 sterile preparation Monitoring -
Physical monitoring Particle counts (non viable) EN ISO 14644-1 Be aware of the small differences between actual ISO and Annex1 Be aware of the BIG differences in future particle count methodology (new revision of EN ISO 14644-1 Accepted with comments)
23
PIC/S PE 010-3 : Classification of air cleanliness
24
ISO 14644 – 1 : Cleanrooms Classification of air cleanliness (current status) ISO
Maximum Number of Particles in Air
Class
(particles in each cubic meter equal to or greater than the specified size) Particle size
25
> 0.1 μm
> 0.2 μm
> 0.3 μm
> 0.5 μm
ISO Class 1
10
2
ISO Class 2
100
ISO Class 3
> 1 μm
> 5 μm
24
10
4
1000
237
102
35
8
ISO Class 4
10,000
2,370
1,020
352
83
ISO Class 5
100,000
23,700
10,200
3,520
832
29
ISO Class 6
1,000,000
237,000
102,000
35,200
8,320
293
ISO Class 7
352,000
83,200
2930
ISO Class 8
3,520,000
832,000
29,300
ISO Class 9
35,200,000
8,320,000
293,000
Particle test for room <500m2 (proposed change) 1. Determine # of sample locations table 2. Divide room into sub-regions of the same area and measure particle at a randomly selected location within each sub-region
3. If all measured particle concentrations comply with the class limit, the classification is passed 26
PIC/S PE 010-3 : guide to good practices for the preparation of medicinal products in healthcare establishments
5 Production 5.2 General requirements -
Trained personnel
-
Equipment and material suitable for the intended use Products and materials should be protected against microbial and other contamination The operational status (e.g. cleaned, in use) of rooms should be 27 clear
-
PIC/S PE 010-3 : guide to good practices for the preparation of medicinal products in healthcare establishments
5 Production 5.3 Prevention of cross contamination -
Necessary technical and organisational measures should be taken
28
Welke extra continue kosten te verwachten ? - Aanmaak, onderhoud en training van procedures - Kledij inclusief reinigen, venietigen, vervangen (invloed desinfecteren op levensduur) - Reiniging en desinfectie lokaal, materiaal, … - Monitoring en (her-) certificatie incl afwijkingsbehandeling - Onderhoud incl. kalibratie - Hoger energieverbruik
Energieverbruik / CO2 footprint
Energie Consumptie : J&J Beerse CAMPUS 14000
35000
69%
12000
30000
10000
25000
8000
8575
85%
85%
22576
25164
15000
6000
6029
4000 2000
20000
69%
5000
3823 1064
0 k US$ elec non seasonal
10000
k US$ gas seasonal
10064 4441
0 Ton CO2 elec
Ton CO2 gas
non seasonal
seasonal
Hoe kan HVAC het energieverbruik in uw bedrijf beïnvloeden ?
Hoe kan HVAC het energieverbruik in uw faciliteit beïnvloeden ? Luchtbehandeling
Filtratie (Free) Cooling Ontvochtiging Bevochtiging (Na) Verwarming Energie recuperatie
Ruimtecondities
Veilig afvoeren
Temp. & Vochtigheid Luchtwisselingen drukhiërarchie stromingspatroon Deeltjestellingen Micro.tellingen
HEPA filters (safe change) Aktief kool filters Afvoer, verdunning, vermijden van kortsluitstromen
Enorme impact op het energieverbruik (van uw HVAC)
Waarom hebben we energie nodig ? 100% verse lucht 2000 m3/h
Winter
Mid
Zomer
Jaar
ROOM
-10'C/90%
10'C/90%
32'C/50%
24/7
21’C/50%
kW
kW
kW
kWh
voorverwarming
18.76
3.52
0.00
42800
koeling
0.00
0.00
-26.25
-12900
fan
1.37
1.37
1.37
12000
naverwarming
0.68
0.00
2.79
4900
stoom
13.57 kg
0.96 kg
0.00 kg
34800kg
+
+
-
Hebben we al deze energie nodig ?
URS/SRS
PID en functies
Filter filosofie
Setpunten voor T, RV en luchtwissels
freq. omvorner
LCC gebaseerd op aankoop + onderhoud
Droogwiel+ warmte recuperatie
Selectie kanalen Verlagen van drukvallen
lokale koeling
STAP 5 ?
Hebben we al deze energie nodig ? Stap 1:Bepalen van correcte gebruikersvereisten DESIGN CRITERIA CONTROL TOLERANCE ALERT LIMIT
ALERT LIMIT DESIGN LIMIT
PRODUCT LIMIT
DESIGN LIMIT PRODUCT LIMIT
SETPOINT RANGE (DEADBAND) ALERT (MAINT.) RANGE PRODUCT RANGE USER REQUIREMENTS
100%
Geïnstalleerde koelcapaciteit
totale koeling/j
100%
85% 63%
58% 33%
21°C / 50%
21°C / 60%
21°C 70%
21°C / 50%
21°C / 60%
21°C 70%
Hebben we al deze energie nodig ? Stap 2 : gebruik historische data ter bepaling van systeemvereisten
Deeltjestellingen Microbiologische data EH&S Data (VOC, geur, comfort,
GMP
MAC, PB-OEL,…)
Comfort parameters Echte warmtelast equipement LWPH : luchtwisselingen per uur VOC : volatile organic compound MAC : maximum allowable concentration PB-OEL : performance based occupational exposure limit
Luchtafvoer
LWPH
Koeling
EH&S
Hebben we al deze energie nodig ? Stap 3: More technology is Less Energy Technische Oplossingen : Warmte recuperatie (24/7 – 1j - ruimtecondities 21°C 50% - gematigd zeeklimaat ) Euro/1000m3/h 3500
3000
100% Fresh Air
2500
+heat • recov
E R
2000
1000
500
0
cost cost cost elec cost cost total heating cooling fan steam
-
+
•
E R
+
1500
Hebben we al deze energie nodig ? Stap 4: Energie simulaties (*1)
Virtuele Cleanroom Afmetingen : 5 m x 10 m x 3,3m Box in box Bezetting : 6.00 – 20.00 ; Maandag – Vrijdag Warmtelast tijdens bezetting : 80 W/m² Luchtdebiet : 2.000 m³/h Locatie : België (Beerse) Methodata *1 data gegenereerd door VLG in opdracht van Janssen Pharmaceutica
Hebben we al deze energie nodig ? Step 4 : Energie simulaties 15% Verse lucht
Optie A
+
RV 45-55% T= 21°C Geen nachtverlaging
-
+
Cleanroom T= 21°C Geen nachtverlaging
RV= 45-55%
Optie B RV 45-55% T= 21-23°C nachtverlaging 18-25°C
Optie C RV 50% T= 21-23°C nachtverlaging 18-25°C
Hebben we al deze energie nodig ? Step 4 : Energie simulaties Optie D
-
+
15% Make-Up air 12°C
+
-
+
Cleanroom T= 21-23°C nachtverlaging 18-25°C
RV= 45-55%
Hebben we al deze energie nodig ? Step 4 : Energie simulaties
Optie E
Min 15% Max 100% free cooling
+
+
Cleanroom T= 21-23°C nachtverlaging 18-25’C
RV= 45 55%
Hebben we al deze energie nodig ? Step 4 : Energie simulaties 2000m3/h
Verse lucht
T lokaal
RV lokaal
Koeling
Verwarming
bevochtiging
kWh/j
kWh/j
kg/j
A
15%
21'C
45-55%
34168
19863
3911
B
15%
18/21-23/25'C
45-55%
28447
11182
2327
C
15%
18/21-23/25'C
50%
35854
18239
2924
D
15%
18/21-23/25'C
45-55%
16127
6531
4508
E
15-100%
18/21-23/25'C
45-55%
12739
4900
5736
40000 30000 cooling kWh/y heating kWh/y humidification kg/Y
20000 10000 0 A
B
C
D
E
Hebben we al deze energie nodig ? Step 5 : Verificatie en opvolging van het HVAC systeem lessons learned Technisch eigenaar wijzigt energievriendelijk “floating setpoint” terug in „energie vretende dauwpuntsregeling‟ “zie je, de regeling werkt nu weer stabiel” opleiding is nodig Perfecte sturingen voor zomerregime kunnen problemen opleveren tijdens winter testen ifv de seizoenen Doet de regeling wat je verwacht had ? T= 21-23°C nachtverlaging 18-25°C
T= 21°C Geen nachtverlaging
Aantonen dat je doet wat je van plan was ?
Ontwerp conform de vereisten Product en Process vereisten
Systeem vereisten
• Lokaalinformatie fiche • Lay out plannen gmp zone, flows3, • Schematische voorstelling systemen
Gebouwd volgens plan?
Uitbating volgens plan ?
• Installatie verificatie specificatie identificatie certificaten veiligheid ergonomie
• • • • • • • •
Procedures Opleiding (toegang) Monitoring (data) Behandeling afwijkingen Onderhoud Trending Energie(rekening) Feed back
Veilig werken met een BSC en LAF-kasten
PIC/S PE 010-3 : guide to good practices for the preparation of medicinal products in healthcare establishments
ANNEX 1 sterile preparation Cytotoxins
-
-
High level of hazard to the operator AND high risk to the product Biohazard safety cabinets (BSCs) Working env.
Background env.
LFC/BSC
Grade A
Grade B
Isolators
Grade A
Grade D
46
PIC/S PE 010-3 : guide to good practices for the preparation of medicinal products in healthcare establishments
ANNEX 1 sterile preparation Cytotoxins BSC
47
Beïnvloeding “avoid contamination” tijdens het gebruik van LAF kasten
Beïnvloeding “avoid contamination” tijdens het gebruik van LAF kasten
Beïnvloeding “avoid cross-contamination”
Aansluiting BSC aan HVAC
Aansluiting BSC aan HVAC
Veilig werken met BSC en LAF kasten
MENS EN MENSELIJK GEDRAG = MEEST BEPALENDE FACTOR VOOR KWALITEIT EN VEILIGHEID
Vragen ?