Jasa Marga Update 1Q 2017
As of 2 May 2017
List of Content 3
Company in Brief
9
Toll Road Industry in Indonesia
12
Jasa Marga’s Strategic Projects
18
Funding Strategy
22
Financial Highlights
2
I
COMPANY IN BRIEF
Proven Track Record in Indonesian Toll Road Business Leading toll road operator in Indonesia with 39 years of experience. Start Operation
1978
1983
1984
1986
1987
1988
1990
1991
1998
2001
2009
2003
2011
2013
2014
2015
2016
2017 BORR (Section 2 & 3)(2)
Jagorawi
SurabayaGempol (4)
Semarang
Padaleunyi JakartaCikampek
Belmera Jakarta-Tangerang
Palikanci
Ulujami- Bogor Outer Pondok Aren Ring Road BORR Jakarta Outer (Section 1)(2) Ring Road (JORR)
Semarang-Solo (Section 2)(2)
(1)
Semarang-Solo (Section 1)(2)
SemarangSolo(2)
SurabayaMojokerto (Section 4)(2)
GempolPandaan(2)
Surabaya-Mojokerto (Section 1A)(2)
Prof. Dr. Ir. Sedyatmo Jakarta Inner Ring Road (JIRR)
Toll Road Concessions
JORR W2 North (Section 1-4)(2)
Cipularang
Gempol-Pasuruan(2)
GempolPasuruan(2) (Section: Bagil-Rembang)
CengkarengKunciran(2) Kunciran-Serpong(2) Surabaya-Mojokerto(2) Medan-KualanamuTebing Tinggi(2)
BORR (Section 2A)(2)
Solo-Ngawi(2) Ngawi-Kertosono(2)
Cinere-Serpong(2)
Nusa Dua-Ngurah Rai-Benoa(2)
Semarang-Batang(2) Pandaan-Malang(2) Balikpapan-Samarinda(2) Manado-Bitung(2) Jakarta-Cikampek II Elevated(2)
Number of Concessions Total Length (km) under Corresponding Concessions(3) Note:
(1) (2) (3) (4) (5)
1
2
59 84
4
131
6
7
223 246
8
9
10
11
329
394
437
463
12
469
13
14 16
527
531
17
19
19
19
19
544
554
576
590
600*
Jakarta Inner Ring Road (JIRR) is comprised of the Cawang-Tomang-Pluit concession granted to Jasa Marga and Cawang-Tanjung Priok-Pluit concession granted to CMNP. Jasa Marga’s newly acquired toll road concessions. The cumulative length of road represents the current total road length that corresponds to key toll road concessions in this table, not to the year where the concession started. Porong-Gempol Section (5 km) within Surabaya-Gempol Toll Road has officially been closed due to force majeure (mud) since 2006. Legth of toll road operated as of April 2017
31
1.260
4
Asian Longest Toll Road Concessions
Granted all 13 concessions for operating toll roads for a 40-year period in 2005(1).
Executed 45-year concessions for 3 new toll roads in 2006 (Bogor Outer Ring Road, Semarang-Solo and Gempol-Pasuruan); 35year concessions for 2 new toll roads in 2008 and 2009 (Cengkareng-Kunciran and Kunciran Serpong); 42-year concessions for 1 acquired toll roads in 2009 (Surabaya-Mojokerto) and 37-year concessions in 2011 (Gempol-Pandaan); 45-year concessions for 1 new toll road in 2011 (Nusa Dua-Ngurah Rai-Benoa); 40-year concessions for 1 new toll road in 2014 (Medan-KualanamuTebing Tinggi), 35-year concessions for 3 acquired toll roads in 2015 (Solo-Ngawi, Ngawi-Kertosono and Cinere-Serpong), 4 new toll road in 2016 with 45-year concessions (Batang-Semarang and Jakarta-Cikampek II Elevated), 35-year concessions (PandaanMalang) and 40-year concession (Balikpapan-Samarinda and Manado-Bitung).
Concession years exhausted
Concession years remaining
5
Company Structure Government of Indonesia (“GOI”)
Shareholding Structure
Regulatory Framework
Foreign 15% Individual 4% Domestic Institution 8%
Ministry of StateOwned Enterprises (“MSOE”)
Government 70%
70% Ownership
Mutual Fund 3%
Granting & Supervising Toll Road concessions
Directorate General of Highways Indonesian Toll Road Authority (“BPJT”)
30% Ownership Since 12 Nov 2007 Public
Ministry of Public Works (“MPW”)
Minister of Public Works
Concession Agreement
Road Network Planning & Setting of Technical Specifications
Concession Agreement
Private Toll Road Investors Private Toll Road Investors
6
The Largest Toll Road Operator in Indonesia Strait of NORTH SUMATERA Malacca Belmera: 42.70 km
: in Operation
Medan-Kualanamu-Tebing Tinggi: 61.70 km EAST KALIMANTAN Balikpapan-Samarinda: 99.35 km
GREATER JAKARTA & WEST JAVA SUMATRA Jagorawi: 59.00 km Jakarta-Tangerang: 33.00 km Ulujami-Pondok Aren: 5.55 km Jakarta Inner Ring Road: 23.55 km Prof. Dr. Ir. Sedyatmo: 14.30 km Jakarta-Cikampek: 83.00 km JORR: 28.3 km Cikampek-Padalarang: 58.50 km Padalarang-Cileunyi: 64.40 km Palikanci: 26.30 km JORR W2 North: 7.70 km Bogor Outer Ring Road: 11.00 km Cengkareng-Kunciran: 14.19 km Kunciran-Serpong: 11.19 km Cinere-Serpong: 10.14 km Jakarta-Cikampek II Elevated: 36.4 km
MALUKU
KALIMANTAN
PAPUA
2012
2013
EAST JAVA Surabaya-Gempol: 49.00 km Banda Sea Gempol-Pandaan: 13.61 km Gempol-Pasuruan: 34.15 km Surabaya-Mojokerto: 36.27 km Sea Pandaan-Malang: 37.62 km Timor
Java Sea
JAVA BALI
CENTRAL Indian Ocean JAVA
BALI Nusa Dua-Ngurah Rai-Benoa: 10.00 km
Semarang: 24.75 km Semarang-Solo: 72.64 km Solo-Ngawi: 90.1 km Ngawi-Kertosono: 87.02 km Semarang-Batang: 75 km
MARKET SHARE
1,260 987
738
61%
799
2014
NORTH SULAWESI Manado-Bitung: 39.9 km
SULAWESI
Concession Rights (km) 738
: in land acquisition and construction
2015
2016
600 km Toll Road in Operation* *as of April 2017
80% Transactions volume
7
Transaction Volume and Toll Revenues TOP 5 Contributor 2017
GREATER JAKARTA AND WEST JAVA
Revenue
6,891 5,907
18.5%
6,282
16.4%
5,268
15.0%
13.8%
275 279
2013
2014
2015
2016
1Q2016 1Q2017
Jagorawi
1,692
5.1%
4.7%
JakartaTangerang
1,674
PT Jalantol Lingkarluar Jakarta
1,127
Jakarta Outer Ring Road
1,095
Purbaleunyi
1,054
Jakarta-Cikampek
1,021
Cawang-TomangCengkareng
8.9%
NON GREATER JAKARTA AND WEST JAVA 1,036
Traffic 7.4%
839
7.7%
7.4%
739
216
234
239 55
261 58
2013
2014
2015
2016
1Q2016 1Q2017
Jagorawi
198
Jakarta Inner Ring Road
176
JakartaCikampek
534
8
II
TOLL ROAD INDUSTRY IN INDONESIA
Toll Road Development Target in Indonesia Factor of Development
Government’s Priority Program
Indonesia population will be grow rapidly
Car sales increase
No connectivity
10
Regulation Tariff Initial toll tariff is calculated based on investment feasibility, toll road user’s ability to pay and vehicle operating cost saving. Investment feasibility is calculated based on estimated investment cost and projected revenue during term of the concession.
Initial toll tariff is stipulated in concession agreement prior to start of construction. Tariff adjustment is regulated by law, is calculated based on CPI and is adjusted once every two years. Initial toll tariff setup and subsequent adjustment is decided by Minister of Public Works decree.
Land Acquisition Land acquisition is Government’s responsibility, is undertaken by Land National Agency Price is determined by independent appraiser based on fair market price. For some projects, Government takes over the land cost. The new land acquisition law carries the following main points: • Fair price is determined through independent appraisal. • Land owner may choose to reject through court, yet court has to decide in 30 days (final). • After transaction process (normal) or by court verdict, project can commence. • Re-settlement is also an option. • The Government should carry out socialization far in advance (transparent). • BPN (National Land Agency) is the only body responsible for land acquisition for public interests.
11
III
JASA MARGA’S PROJECT
Jasa Marga’s New Projects as of 31 March 2017
Section
Length
Investment Cost
(km)
(Rp trillion)
JSMR Ownership (%)
2057
10
2.01
55.0%
2044
7.7
2.01
65.0%
2049
13.61
1.31
92.2%
2054
11
4
55.0%
2055
72.6
7.3
73.9%
2049
36.3
4.03
55.0%
2058
34.15
4.17
98.8%
Concession Period
A. Fully Operated
1 2
Nusa Dua-Ngurah Rai-Benoa (4) JORR W2 North (part of JORR)
(5)
B. Half Operated 3 4 5
Gempol-Pandaan(6) Bogor Outer Ring Road
(1)
Semarang-Solo (part of Trans Java)
(2)
6
Surabaya-Mojokerto (part of Trans Java)
7
Gempol-Pasuruan (part of Trans Java) (7)
(3)
C. In Land Acquisition and Construction 8
JORR2 (Cengkareng-Kunciran)
35 years form effective date
14.19
4.98
76.2%
9
JORR2 (Kunciran-Serpong)
35 years form effective date
11.19
2.86
60.0%
10
Medan-Kualanamu-Tebing Tinggi
40 years form effective date
61.7
4.71
55.0%
11
Solo-Ngawi (part of Trans Java)
35 years form effective date
90.1
9.21
60.0%
12
Ngawi-Kertosono (part of Trans Java)
35 years form effective date
87.02
7.05
60.0%
13
JORR2 (Serpong-Cinere)
35 years form effective date
10.14
2.57
55.0%
14
Batang-Semarang (part of Trans Java)
45 years form effective date
75
11.04
60.0%
15
Pandaan-Malang
35 years form effective date
37.62
5.97
60.0%
16
Balikpapan-Samarinda
40 years form effective date
99.35
9.97
55.0%
17
Manado-Bitung
40 years form effective date
39.9
5.12
65.0%
18
Jakarta-Cikampek II Elevated
45 years form effective date
36.4
16.23
80.0%
747.97
104.54
TOTAL
Notes: (1) Section 1: Sentul-Kedung Halang (3.85 km) is operated since 23 November 2009; Section 2A: Kedung Halang-Kedung Badak (1.95 km) is operated since 04 June 2014. (2) Section 1: Semarang-Ungaran (10.80 km) is operated since 17 November 2011; Section 2: Ungaran-Bawen (12.30 km) is operated since 04 April 2014. (3) Section 1A: Waru-SeLength (2.30 km) is operated since 05 September 2011, Section 4: Kriyan-Mojokerto is operated since 19 March 2016 (4) Operated since 01 October 2013. (5) Section Kebon Jeruk-Cileduk (5.70 km) is operated since 04 January 2014; Section Cileduk-Ulujami (2.00 km) is operated since 22 July 2014. (6) Section Gempol-Pandaan (13.61 km) is operated since 12 June 2015. 13 (7) Gempol-Pasuruan: Section Bangil-Rembang (7 km) is operated since 13 April 2017.
Toll Road Network and Jasa Marga’s Project in Greater Jakarta
Kunciran-Serpong (10.14 km)
Serpong-Kunciran (11.19 km) Cinere-Serpong (10.14 km)
Jakarta Cikampek II Elevated (36.4 km)
BORR (11 km)
Project
Length
Jasa Marga Ownership
Investment Cost
Concession Period
Land Acquisition As of 31 Mar 2017
Construction As of 31 Mar 2017
Bogor Outer Ring Road
11 km
55%
Rp 4.00 trillion
2054
Section 2B Kd. Badak-Yasmin: 84%
6.37%
Cinere-Serpong
10.14 km
55%
Rp 2.57 trillion
35.79%
-
Kunciran-Serpong
11.19 km
60%
Rp 2.86 trillion
75.94%
-
Cengkareng-Kunciran
14.19 km
76.2%
Rp 4.98 trillion
26.10%
-
80%
Rp 16.23 trillion
-
-
Jakarta-Cikampek II Elevated 36.4 km
35 years from effective date 35 years from effective date 35 years from effective date 45 years from effective date
14
Toll Road Network and Jasa Marga’s Project in Java
15
Toll Road Network and Jasa Marga’s Project in Java Project
BatangSemarang
Length
75 km
Jasa Marga Ownership
60%
Investment Concession Period Cost
Rp 11.05 trillion
Semarang-Solo
72.64 km
73.91%
Rp 7.3 trillion
Solo-Ngawi
90.1 km
59.99%
Rp 5.14 trillion
NgawiKertosono
87.02 km
59.99%
Rp 3.83 trillion
SurabayaMojokerto
36.3 km
55%
Rp 3.8 trillion
PandaanMalang
37.62 km
GempolPasuruan
34.20 km
60%
Rp 5.97 trillion
98.60%
Rp 4.17 trillion
45 years from effective date
2055 35 years from effective date
35 years from effective date
2049
Section Section 1 Batang –Batang Timur (3.2 km) Section 2 Batang Timur-Weleri (36.35 km) Section 3 Weleri-Kendal (11.05 km) Section 4 Kendal-Kaliwungu (13.50 km) Section 5 Kaliwungu-Krapyak (10.9 km)
Land Acquisition As of 31 Mar 2017
Construction As of 31 Mar 2017
100% 94.09% 47.94% 52.35% 80.61%
Section 1&2: 15.47% Section 3: 13.15% Section 4&5: 23.59%
Section Bawen-Salatiga (17.5 km) Section Salatiga-Kartasuro (29.02km)
100%; 97.80%
Section 3: Package 3.1: 90.41% Package 3.2: 100% Package 3.3 B: 100% Package 3.3 D 97.74%
Section I : Solo-Mantingan (35.15 km) Section II : Mantingan - Ngawi (34.2 km)
91.74% 92.06%
75.49% 51.70%
Section I : Ngawi - Magetan (20 km) Section II : Magetan - Madiun (8.45 km) Section III : Madiun - Saradan (21.06 km)
97.86% 95.05% 98.41%
54.04% 58.00% 67.25%
100% 100% 100%
82.51% 33.85% 39.99%
41.40% 88.28% 68.12% 84.31%
Section I-V: 4.27%
98.59% 92.09% 34.23%
93.70% 2.28% -
Section 1B: Sepanjang-WRR (4.3 km) Section 2: WRR-Driyorejo (5.1 km) Section 3: Driyorejo-Kriyan (6.1 km)
35 years from effective date
Section I : Purwodadi- Pandaan (14.92 km) Section II : Lawang-Purwodadi (8 km) Section III : Pakis I - Lawang (7.5 km) Section IV : Pakis II – Pakis I (4.10 km) Section V : Malang-Pakis II (3.10 km)
45 years from effective date
Section1: Gempol-Rembang (13.9 km) Section 2: Rembang-Pasuruan (6.6 km) Section 3: Pasuruan-Grati (13.65 km)
16
Toll Road Projects in Sumatera, Kalimantan and Sulawesi Strait of NORTH SUMATERA Malacca
Medan-Kualanamu-Tebing Tinggi: 61.70 km EAST KALIMANTAN Balikpapan-Samarinda: 99.35 km MALUKU
SUMATRA
SULAWESI KALIMANTAN
NORTH SULAWESI Manado-Bitung: 39.9 km
Java Sea
Project
Medan Kualanamu Tebing Tinggi
BalikpapanSamarinda
Manado-Bitung
Length
61.7 km
99.35 km
39.9 km
Jasa Marga Investment Concessio Cost n Period Ownership
Section
Land Acquisition As of 31 Mar 2017
Construction As of 31 Mar 2017
Rp 4.71 trillion
• • 40 years • from • effective • date • •
Tj. Morowa-Parbarakan-Kualanamu (17.8 km) Parbarakan-Lubuk Pakam (4.85 km) Lubuk Pakam-Adolina Adolina-Perbaungan Perbaungan-Teluk Mengkudu Teluk Mengkudu-Sei Rampah Sei Rampah-Tebing Tinggi
99.03% 100% 98.39% 96.19% 99.32% 91.13% 43.76%;
66.32% 100% 91.02% 79.23% 69.17% 68.41% -
55%
Rp 9.97 trillion
• 40 years • from • effective • date •
Balikpapan-Samboja (22 km) Samboja-Muarajawa (31 km) Muarajawa-Palaran (17.3 km) Palaran-Samarinda (18 km) Sepinggan-Km 13 Balikpapan (11.1 km)
98.93% 98.96% 93.49% 55.32% 67.87%
section 2, 3, 4 : 3.61%
65%
Rp 5.12 trillion
40 years • from • effective • date
Ring Road Manado-Sukur (7.9 km) Sukur-Airmadidi (7 km) Airmadidi-Bitung (25 km)
55%
93% 45.00% 31.79%
-
17
III
FUNDING STRATEGY
Capital Expenditure Plan 2017 (billion Rupiah)
No.
Item
1 Capex of Jasa Marga (Parent) a. Operational b. New Toll Road Development c. Other Business Investments d. Investments in Non-Operational Supporting Facilities
2 Capex of Subsidiaries
3 Capex of Subsidiaries for Other Business
4 Equity Contribution to Subsidiaries Total Consolidated Capex
2016
2017 Plan
2,975.6
8,261.8
1,139.2
2,161.2
1,287.8
4,375.1
416.5
1,486.6
132.1
238.9
7,985.9
14,189.4
243.8
1,15.2
(1,628.4)
(3,912.3)
9,577.0
19,554.2 19
Financial Capacity EBITDA & EBITDA Margin 6.00 5.00
ICR, DER
5.23 59% 4.01
4.29
4.00
59%
3.50
58%
4.00
57%
3.00 2.00
60%
56%
56%
55%
55%
2.50 1.50 1.00 0.50
-
53%
0.00
EBITDA
2016
2014
EBITDA Margin
2014
2015
ICR
2015
2.27
1.97
1.89
2.00
54% 2015
3.05
3.00
1.00 2014
3.44
3.30
2016
2016
DER
1Q2017
20
Funding Strategy Asset Recycling • Securitization planned from future revenue at mature section and targeted Rp 1-3 trillion
Debt Recycling • Planed to issue Bond/ Sukuk through Sustainable Bond II (2017 – 2019) Rp 19.8 trillion (In 2017 -Trace I up to Rp7 Trillion) • Planed to issue Project Bond in Operated Subsidiaries
• Current Status : Legal and Accounting Study
Bond/Sukuk Securitization Fund Rising • Divestment stock ownership in Kebon Jeruk-Penjaringan Toll Road (PT Jakarta Lingkar Barat Satu) up to 19,1% • Divestment stock ownership in SemarangSolo Toll Road (PT Trans Marga Jateng) minimum 55% from 73,91%
Divestment
• Jasa Marga planed to establish Trans Java Sub holding To simplify operational activity 15 toll road owned by Jasa Marga & Waskita Toll Road and planed to go public at 2018 • Current Status : Valuation Study
Trans Java Sub holding 21
IV
FINANCIAL HIGHLIGHTS
Positive Growth in 2016 Revenue 6,311
2013
7,228
7,631
2015
Toll Revenue 5,803
8,832
5,229 3,399
2014
6,646
7,121
2016
2,049
2,140
1Q2016
1Q2017
2013
2014
2015
2013
581
2014
Operating Income 3,073
2015
2016
1,379
1Q2016
1Q2017
64%
2016
1,914
1,953
1Q2016
1Q2017
2013
36%
2016
55%
56%
2014
2015
59%
60%
2016
1Q2016
1Q2017
Operating Margin
510
2015
2014
1,234
7,926
Other Business Revenue906 508
4,007
4,285
EBITDA Margin
54%
2013
(Rp billion)
EBITDA
135
187
1Q2016
1Q2017
2013
57%
43%
46%
47%
48%
2014
2015
2016
1Q2016
Net Income Margin
4,166
3,478
20%
19%
2014
2015
21%
1Q2017 24%
20%
16%
2,259
2013
2014
2015
2016
978
1,211
1Q2016
1Q2017
2013
2016
1Q2016
1Q2017
23
Summary of Income Statements (billion Rupiah)
(FYE 31 Dec) REVENUE Toll and Other Operating Expenses General and Administrative Expenses Other Expenses Others Income OPERATING INCOME Operating Income Margin EBITDA EBITDA Margin Interest Expenses INCOME BEFORE TAX Income Tax Expense NET INCOME Net Income Margin
Y2013 Restated
Y2014 Restated
(Audited)
(Audited)
Y2015
Y2016
1Q2016
1Q2017
∆Rp
∆%
(Audited)
(Audited)
(Unaudited)
(Unaudited)
(YoY)
(YoY)
6,310.9
7,227.8
7,630.7
8,832.3
(3,231.3)
(3,562.8)
(3,518.0)
(4,022.9)
(908.7)
(1,087.8) (33.5) 254.7 2,259.2 35.8% 3,398.5 53.9% (944.2) 1,310.6 (381.9) 1,027.7 16.3%
(884.8) (20.3) 287.9 3,072.7 42.5% 4,006.8 55.4% (1,215.3) 1,850.7 (613.7) 1,421.7 19.7%
(893.3) (29.8) 272.9 3,477.7 45.6% 4,285.0 56.2% (1,405.0) 2,068.3 (749.1) 1,466.4 19.2%
(949.0) (99.0) 357.1 4,165.5
47.2% 5,228.5 59.2% (1,509.0) 2,649.7 (846.6) 1,889.3 21.4%
2,049.0
91.4
4.5%
(932.8)
(24.1)
2.6%
(209.3) (16.7)
(210.2) (35.5)
59.1 978.5 47.8% 1,233.8 60.2%
232.2
(0.9) (18.7) 173.2 232.4 N/A 145.03 N/A (76.37) 106.04 (17.58) 98.68 N/A
0.4% 111.9% 293.2% 23.8% 8.8% 11.8% 4.2% 21.1% 17.2% 7.6% 24.2% 3.8%
(361.2)
616.2 (231.8)
408.5 19.9%
2,140.4
1,210.9
56.6% 1,378.9 64.4% (437.6) 722.3 (249.4) 507.2
23.7%
24
Summary of Balance Sheets (billion Rupiah)
(FYE 31 Dec) Cash and Cash Equivalent Other Current Assets Non Current Assets TOTAL ASSETS Current Liabilities Non Current Liabilities TOTAL LIABILITIES Equity TOTAL LIABILITIES AND EQUITY
Y2013 Restated
Y2014 Restated
(Audited)
(Audited)
Y2015
Y2016
1Q2017
(Audited)
(Audited)
(Unaudited)
∆Rp
∆%
3,514.1
3,290.8
3,323.2
4,124.9
4,319.8
194.9
4.7%
274.2 24,276.2 28,064.5 4,870.8 13,004.4 17,875.2 10,189.3
255.0 28,314.2 31,860.0 4,301.0 16,538.2 20,839.2 11,020.7
405.8 32,995.9 36,725.0 7,743.8 16,612.5 24,356.3 12,368.7
8,841.0 40,534.4 53,500.3 18,627.0 18,534.5 37,161.5 16,338.8
11,934.7 43,027.2 59,281.7 19,368.9 23,502.1 42,871.0 16,410.7
3,093.7 2,492.8 5,781.4 741.9 4,967.6 5,709.5 71.9
35.0% 6.1% 10.8% 4.0% 26.8% 15.4% 0.4%
28,064.5
31,860.0
36,725.0
53,500.3
59,281.7
5,781.4
10.8%
25
Forward Looking 2017 (billion Rupiah)
Financial & Operational Performance
2016 Audited
2017 Plan
∆(YoY)
CAPEX (Rp)
9,577.0
19,554.2*
104%
Revenue (Rp) (excluding construction revenue)
8,832.3
10,286.5
16%
1.36
1.36**
Traffic (billion vehicle transactions)
Kinerja Keuangan dan Operasional
2016 Audited
Total Asset (Rp)
2017 Plan
∆(YoY)
53,500.3
74,818.7
40%
Interest Coverage Ratio
3.44
2.56
-26%
Debt to Equity Ratio
2.27
2.79
23%
*There are changes in operating system and the integration system of transactions
26
Toll Road Operation Plan 2017
Medan-Kulanamu-Tebing Tinggi Section Perbarakan - Sei Rampah
Jalan Tol Semarang-Solo Section Bawen - Salatiga
210 Km New Operation Toll Road
Solo-Ngawi
25.0 KM Ngawi - Kertosono Section Ngawi - Saradan
Surabaya - Mojekerto Section Sepanjang - Krian Gempol - Pasuruan
27
Other Business Developmet (Rp billion) 1Q 2016
Chart Title
7%
187
1Q 2017 9%
906
135
38.6%
93%
Toll Revenue
91% 7,927
Other Business
1Q 2016
1Q 2017
Toll Operation Services
Maintenance Services
Property
To give operation services for Jasa Marga and other toll road investor
To give maintenance services for Jasa Marga and other toll road investor
Manage rest area and property on the toll road coridor 28
Traffic Volume by Section (million vehicle transactions) ∆% Section
Branch/Subsidiary
2012
2013
2014
2015
2016
1Q2016
1Q2017
1Q17 vs. 1Q16
CAGR 2012-2016
1
Jagorawi
Jagorawi
189.9
199.6
201.3
204.2
207.7
50.9
51.3
0.9%
2.3%
2
Jakarta-Cikampek
Jakarta-Cikampek
194.9
202.2
206.1
215.0
221.7
54.7
53.8
-1.5%
3.3%
3
Jakarta-Tangerang
Jakarta-Tangerang
107.9
113.0
119.8
127.4
130.9
31.9
32.7
2.3%
5.0%
4
Prof. Dr. Ir. Sedyatmo
72.1
74.8
76.4
76.2
79.6
18.9
20.4
8.1%
2.5%
205.4
208.3
206.4
208.5
215.3
52.2
53.5
2.6%
1.2%
60.3
58.0
60.0
60.0
61.0
14.8
17.0
14.2%
0.3%
5.3
5.9
6.3
6.3
6.5
1.5
-100.0%
5.0%
82.9
89.6
97.7
23.6
24.2
2.5%
6.6%
48.1
50.4
12.2
1.4%
3.4%
Cawang-Tomang-Cengkareng 5
Jakarta Inner Ring Road
6
Padaleunyi Purbaleunyi
7
Cipularang
8
Surabaya-Gempol
Surabaya-Gempol
75.5
81.7
9
Semarang
Semarang
45.3
48.9
10 Belmera
Belmera
21.7
24.0
25.4
24.8
25.8
6.2
6.9
10.2%
4.4%
11 Palikanci
Palikanci
19.3
20.2
19.9
23.0
19.0
6.1
3.4
-45.2%
-0.4%
76.1
79.6
84.5
90.7
95.8
22.9
24.1
5.2%
5.9%
44.3
46.9
45.1
43.7
46.1
11.0
11.8
6.9%
1.0%
11.2
12.5
13.7
15.3
16.5
3.9
3.9
0.6%
10.1%
12 Jakarta Outer Ring Road
13 Ulujami-Pondok Aren
PT Jalantol Lingkarluar Jakarta
51.8
12.1
14 Bogor Outer Ring Road
PT Marga Sarana Jabar
15 Surabaya-Mojokerto
PT Marga Nujyasumo Agung
8.6
11.3
12.1
13.0
15.4
3.5
4.0
15.2%
15.5%
16 Semarang-Solo
PT Trans Marga Jateng
5.0
6.6
15.6
18.7
20.5
4.6
4.8
4.9%
42.6%
PT Jasamarga Bali Tol
-
3.3
14.3
16.5
17.5
3.9
4.4
12.4%
N/A
18 JORR W2 Utara
PT Marga Lingkar Jakarta
-
-
14.5
24.7
26.9
6.4
7.2
11.9%
N/A
19 Gempol-Pandaan
PT Jasamarga Pandaan Tol
-
-
-
2.8
5.8
1.4
1.6 15.17%
1,142.8
1,196.8
1,252.4
1,310.8
1,361.3
330.5
17
Nusa Dua-Ngurah RaiBenoa
TOTAL
Note: JORR S has been taken off from JORR traffic since March 2016
337.2
2.0%
N/A 4.5%
29
Toll Revenue by Branch/Subsidiary (billion Rupiah)
Cabang/Anak Perusahaan
2013
2014
2015
2016
1Q2016
1Q2017
∆%
CAGR
1Q17 vs. 1Q16
2012-2016
1 Jagorawi
548.2
607.5
620.2
697.0
167.1
173.0
3.5%
8.2%
2 Jakarta-Cikampek
976.6
1,023.4
1,137.8
1,232.5
300.4
319.8
6.4%
8.3%
3 Jakarta-Tangerang
408.0
467.1
507.5
580.7
141.8
145.0
2.2%
11.2%
4 Cawang-Tomang-Cengkareng
1,110.0
1,212.3
1,247.0
1,412.7
334.5
360.9
7.9%
7.4%
5 Purbaleunyi
1,017.4
1,175.9
1,197.5
1,350.6
325.9
293.2
-10.0%
9.9%
6 Surabaya-Gempol
270.5
309.0
335.8
402.0
96.9
103.0
6.4%
13.7%
7 Semarang
104.8
106.5
113.2
136.6
31.9
32.4
1.5%
8.9%
8 Belmera
81.6
91.3
90.2
105.5
25.5
27.3
6.9%
9.6%
9 Palikanci
107.5
112.4
133.0
169.5
38.5
39.9
3.8%
13.9%
1,055.0
1,182.4
1,163.7
1,010.2
298.2
269.9
-9.5%
-4.5%
5,679.5
6,288.0
6,545.9
7,097.3
1,760.6
1,764.4
0.2%
6.6%
11 PT Marga Sarana Jabar
45.6
67.2
86.9
100.2
22.6
24.5
8.6%
25.0%
12 PT Marga Nujyasumo Agung
17.6
18.8
20.1
36.0
5.6
10.2
82.0%
28.0%
13 PT Trans Marga Jateng
36.5
107.3
129.5
152.8
33.5
36.6
9.3%
53.6%
14 PT Jasamarga Bali Tol
10 PT Jalantol Lingkarluar Jakarta TOTAL PARENT LEVEL
23.7
106.1
122.7
143.3
32.1
35.6
10.8%
N/A
15 PT Marga Lingkar Jakarta
-
59.0
188.0
337.3
45.6
65.7
44.1%
N/A
16 PT Jasamarga Pandaan Tol
-
-
27.8
59.7
13.8
16.0
15.8%
N/A
123.2
358.4
575.1
829.3
153.2
188.7
23.1%
78.4%
5,802.7
6,646.4
7,121.0
7,926.6
1,913.9
1,953.0
2.0%
9.2%
TOTAL SUBSIDIARY LEVEL TOTAL
30
e-Toll Card Implementation Plan No.
1
Toll Road Section Cawang-Tomang-Pluit
2009
2010
2011
2012
2013
2014
2015
2016
1Q 2017
2.46%
5.57%
7.36%
11.69%
13.32%
14.72%
23.54%
36.25%
37.49%
14.45% 16.35%
23.95%
36.30%
37.09%
0.67%
7.36%
17.97%
19.84%
(Jakarta Inner Ring Road) 2
Prof. Dr. Ir. Sedyatmo (Airport)
2.32%
6.21%
3
Purbaleunyi
4
Jakarta-Cikampek
5
Palikanci
6
Jagorawi
7
Surabaya-Gempol
3.54%
3.30%
8
Semarang
1.59%
1.32%
9
Jakarta Outer Ring Road
10
1.13%
8.11%
0.46%
12.26%
6.78%
8.53%
9.01%
9.31%
17.10%
21.34%
0.78%
0.68%
0.75%
2.80%
4.68%
4.25%
11.80% 14.90%
12.57%
18.83%
21.32%
3.05%
7.51%
12.45%
16.17%
2.13%
10.27%
18.87%
25.91%
11.78%
14.25% 16.04%
22.33%
30.09%
35.37%
Jakarta-Tangerang
8.42%
13.51% 14.72%
20.77%
33.97%
39.19%
11
Belmera
2.29%
12
Bogor Outer Ring Road
13
Semarang-Bawen
14
Nusa Dua-Ngurah Rai-Benoa
15
JORR W2 North
3.22%
TOTAL
9.97%
2.52%
3.35%
4.36%
16.61%
22.60%
5.06%
6.57%
17.25%
22.96%
24.25%
2.44%
12.82%
20.12%
25.29%
1.95%
3.91%
9.86%
11.41%
30.99%
33.33%
24.20%
28.15%
2.93%
2.42%
5.55%
5.17%
9.25%
10.92% 11.57%
15.61%
On 21 March 2016, e-Toll payment was applicable for all SOE Bank cards in JORR, Jakarta-Tangerang and BORR.
31
THANK YOU