RENCANA PENGADAAN / PROCUREMENT PLAN 2009 WATER RESOURCES and IRRIGATION MANAGEMENT PROGRAM ( WISMP I ) APL I COMPONEN A, B, C ( DITJEN SDA ) KOMPONEN A & B DIPA No. SP NAMA SATKER : Dinas Pekerjaan Umum Provinsi Jawa Timur Estimasi Biaya NO
KODE
UNIT ORGANISASI, NAMA PAKET, JENIS PEKERJAAN/PENGADAAN
1
2
3
BALAI PSAWS BANGO GEDANGAN ( MALANG )
CW1
Public Disclosure Authorized
US $
Metode Pengadaan
Post / Prior Review
Pengumuman Pengadaan
Pemasukan Penawaran
Eval / Nego
Penanda tanganan kontrak
4
5
6
7
8
9
10
11
NS
Post Review
Apr-09
Apr-09
Apr-09
30 Hari
NS
Post Review
Apr-09
Apr-09
Apr-09
30 Hari
II
Penyiapan Ruangan SIM BALAI PSAWS BENGAWAN SOLO , BOJONEGORO
CW1
Penyiapan Ruangan SIM
Gd1
Gd2
Gd3
Gd4
II 1. Gd1 Gd2 Gd3
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
12,870,000 3,370,000 9,500,000
1,514.118 396.471 1,117.647
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
22,200,000 12,500,000 9,700,000
2,611.765 1,470.588 1,141.176
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
15,000,000 15,000,000
1,764.706 1,764.706
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
BALAI PSAWS BANGO GEDANGAN ( MALANG )
217,812,000
25,624.941
Kendaraan Berm otor
170,000,000 130,000,000 40,000,000
20,000.000 NS NS
Post Review Post Review
Apr-09 Apr-09
Apr-09 Apr-09
May-09 May-09
30 Hari 30 hari
22,592,000 2,000,000 600,000 1,938,000 4,200,000 5,854,000 8,000,000
2,657.882
NS
Post Review
Apr-09
Apr-09
May-09
30 hari
18,020,000 13,700,000 950,000 3,370,000
2,120.000
NS
Post Review
Apr-09
Apr-09
May-09
30 hari
847.059
NS
Post Review
Apr-09
Apr-09
May-09
30 hari
Pos Review
Mar-09
Mar-09
Apr-09
30 Hari
P eralatan Kom puter
P eralatan Kom puter
P eralatan Audio
Pengadaan kendaraan roda 4 Pick Up Pengadaan kendaraan roda 2
P eralatan Kantor / M eubelair
P eralatan Kom puter Server Cable UTP UPS
Gd5
Alat Kom unikasi Pengadaan Handy Talky BALAI PSAWS PUNCU SELODONO ( KEDIRI )
III 1.
Gd.1
10,882.353
440.000 245.882 194.118
Meja Kerja Kursi Kerja Meja Komputer Filling Kabinet Lemari Rak AC Gd4
92,500,000
2,090,000 1,650,000
- Handycam
4.
10,882.353
3,740,000
P eralatan Kantor
- Notebook - Printer Laser
3.
92,500,000
6,330.588
UPS Notebook
2.
5,853.882
53,810,000
Alat Penjilidan Buku Alat Pemotong Kertas
4
49,758,000
214,225
DINAS PU PROPINSI JAWA TIMUR
I
3
5,854
1,820,909,000
GOODS ( Category 2 )
2
49,758,000
16,736.235
P erbaikan Gedung / R uangan
1
1
142,258,000
P erbaikan Gedung / R uangan
1
Public Disclosure Authorized
Jangka Keteran gan / Waktu Kontrak Permas alahan 12 13
Rp
DINAS PU PROPINSI JAWA TIMUR WORKS (Category 1) I
losure Authorized
Status : Januari 2009
Kendaraan Berm otor Pengadaan kendaraan roda 2 PROCUREMENT WISMP I - TA. 2009 DINAS PU PENGAIRAN PROPINSI JAWA TIMUR
7,200,000 7,200,000 145,077,000
17,067.882
40,000,000 40,000,000
4,705.882 4,705.882
6,331
25,624.941
17,067.882 NS
Halaman 1 dari 10 Lembar
Estimasi Biaya NO
KODE
UNIT ORGANISASI, NAMA PAKET, JENIS PEKERJAAN/PENGADAAN
1 2.
2 Gd.2
3
3.
Gd.3
Gd.4
Gd.6
1.
3.
Gd2
Gd3
Gd4
Gd5
2
9 Mar-09
10 Mar-09
11 Apr-09
NS
Pos Review
Apr-09
Apr-09
Apr-09
30 Hari
5,877,000 510,000 2,067,000 1,800,000 1,500,000
691.412 60.000 243.176 211.765 176.471
NS
Pos Review
Apr-09
Apr-09
Apr-09
7 hari
5,854,000 2,040,000 3,074,000 740,000
688.706 240.000 361.647 87.059
NS
Pos Review
Mar-09
Mar-09
Apr-09
30 Hari
136,068,000
16,008.000
P eralatan Kom puter
Bahan Bangunan
Kendaraan Berm otor 40,000,000
4,705.882
NS
Post Review
Apr-09
Apr-09
May-09
30 hari
P eralatan Hidrologi
9,900,000
1,164.706
NS
Post Review
Apr-09
Apr-09
May-09
30 hari
Pengadaan Peralatan Penakar Hujan Alat Penakar Hujan Tiang untuk alat penakar hujan Gelas ukur
6,300,000 2,350,000 1,250,000 49,518,000 9,500,000 950,000 7,500,000 4,848,000 350,000 3,370,000 13,000,000 10,000,000
5,825.647
NS
Post Review
Apr-09
Apr-09
May-09
60 hari
21,800,000 10,800,000 1,000,000 10,000,000
2,564.706
NS
Post Review
Apr-09
Apr-09
May-09
60 hari
14,850,000
1,747.059
NS
Post Review
Apr-09
Apr-09
May-09
60 hari
183,857,000
21,630.235
P eralatan Kom puter
Alat Kom unikasi
Bahan Bangunan
BALAI PSAWS GEMBONG PEKALEN ( PASURUAN )
1
8
4,952.471 58.824 164.706 882.353 494.118 252.941 1,529.412 1,140.706 43.529 385.882
Bahan swakelola untuk perbaikan bangunan pengukur debit V
7 Pos Review
42,096,000 500,000 1,400,000 7,500,000 4,200,000 2,150,000 13,000,000 9,696,000 370,000 3,280,000
P eralatan Kantor / M eubelair
Pengadaan Handy Talky Antena Rig 5.
6 NS
Jangka Keteran gan / Waktu Kontrak Permas alahan 12 13 30 Hari
2,117.647 3,117.647 794.118
Laptop Mouse Optical PC Komputer Printer laser jet Stavolt UPS Scaner LAN 4.
Penanda tanganan kontrak
18,000,000 26,500,000 6,750,000
Pengadaan kendaraan roda 2 2.
Eval / Nego
Pengadaan Peralatan Penakar Hujan Penakar Hujan Manual Sunshine recorder Clock ARR
BALAI PSAWS BUNTUNG PAKETINGAN ( SURABAYA ) Gd1
Pemasukan Penawaran
5 6,029.412
Batu Kali PC Pasir
IV
Pengumuman Pengadaan
P eralatan Hidrologi
Swicth Hub 16 pin Wireless-G PCI Card with speed Booster Bluetootch USB Adapter Alat komunikasi Rig 5.
US $
Post / Prior Review
4 51,250,000
Kursi Lipat Filling Kabinet Komputer PC Handy cam LCD Monitor Scanner Printer Laser Speaker Active Alat Penghancur Kertas 4.
Rp
Metode Pengadaan
Kendaraan Berm otor Gd1
Pengadaan kendaraan roda 2
40,000,000
4,705.882
NS
Post Review
Apr-09
Apr-09
May-09
30 hari
Gd2
Peralatan Kantor / Meubelair Meja Komputer Filling Kabinet Lemari Rak Printer Laser
24,788,000 1,292,000 2,800,000 11,000,000 9,696,000
2,916.235 152.000 329.412 1,294.118 1,140.706
NS
Post Review
Apr-09
Apr-09
May-09
30 hari
PROCUREMENT WISMP I - TA. 2009 DINAS PU PENGAIRAN PROPINSI JAWA TIMUR
Halaman 2 dari 10 Lembar
Estimasi Biaya NO
KODE
UNIT ORGANISASI, NAMA PAKET, JENIS PEKERJAAN/PENGADAAN
1
2
3
3
Gd3
4
Gd4
Post / Prior Review
Pengumuman Pengadaan
Pemasukan Penawaran
Eval / Nego
Penanda tanganan kontrak
8
9
10
11
Rp
US $
Metode Pengadaan
4
5
6
7
Jangka Keteran gan / Waktu Kontrak Permas alahan 12 13
Peralatan Komputer Stavolt 500 VA Wireless-G PCI Card with speed Booster Bluetootch USB Adapter UPS
8,514,000 1,400,000 689,000 3,055,000 3,370,000
1,001.647 164.706 81.059 359.412 396.471
NS
Post Review
Apr-09
Apr-09
May-09
30 hari
Alat Kom unikasi
6,500,000 3,000,000 1,000,000 2,500,000
764.706 352.941 117.647 294.118
NS
Post Review
Apr-09
Apr-09
May-09
30 hari
Pengadaan Handy Talky Antena Rig 5
Gd5
Gelas Penakar Hujan, Gelas Syphon, Gembok Pengaman Penakar Hujan, Service Jam ARR, Pagar Pengaman Penakar Hujan
46,055,000
5,418.235
NS
Post Review
Apr-09
Apr-09
May-09
30 hari
6
Gd6
Pemasangan dan Pengoperasian Sistem Peringatan Dini Banjir
58,000,000
6,823.529
NS
Post Review
Apr-09
Apr-09
May-09
30 hari
BALAI PSAWS BONDOYUDO MAJANG ( LUMAJANG )
221,190,000
26,022.353
Kendaraan Berm otor
170,000,000 130,000,000 40,000,000
20,000 15,294.118 4,705.882
NS NS
Post Review Post Review
Apr-09 Apr-09
Apr-09 Apr-09
May-09 May-09
30 Hari 30 Hari
4,390,000 1,020,000 3,370,000
516 120.000 396.471
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
45,000,000 2,400,000 8,500,000 2,500,000 13,000,000 18,600,000
5,294.118 282.353 1,000.000 294.118 1,529.412 2,188.235
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
1,800,000 1,800,000
212 211.765
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
242,100,000
28,482.353
47,000,000 20,000,000 15,000,000 12,000,000
5,529.412 2,352.941 1,764.706 1,411.765
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
VI 1 Gd1 Gd2 2
Gd3
Pengadaan kendaraan roda 4 Pick Up Pengadaan kendaraan roda 2
P eralatan Kom puter Hub Network 8 port UPS
3
Gd4
P eralatan Hidrologi Cooler box for sample botles Total suspended acids Sedimen Sampler COD Reactor BOD Incubator
4
Gd5
P eralatan Laboratorium Pemeliharaan/penggantian peralatan Lab kualitas air BALAI PSAWS SAMPEAN BARU BONDOWOSO
VII 1
I Gd1
Kegiatan yang dibiayai LOAN
P eralatan Kantor / M eubelair Kursi kerja dan Meja Kerja Kursi Rapat Meja Rapat
2
Gd2
Mobil Pick Up
130,000,000
15,294.118
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
3
Gd3
Sepeda Motor
40,000,000
4,705.882
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
4
Gd4
Radio HT, Antena, Rig
11,400,000
1,341.176
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
13,700,000
1,611.765
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
122,482,000
14,409.647
Pengadaan kendaraan roda 2
40,000,000
4,705.882
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
P eralatan Kantor / M eubelair
13,196,000 1,000,000 300,000 3,250,000 646,000 8,000,000
1,552.471 117.647 35.294 382.353 76.000 941.176
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
45,761,000 7,500,000 9,500,000
5,383.647 882.353 1,117.647
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
5
Gd5
Server BALAI PSAWS MADIUN, MADIUN
VIII 1
Kendaraan Berm otor Gd1
2
P eralatan Kom puter
Gd2
Meja Kerja Kursi Kerja Almari Besi Meja Komputer AC 3
Gd3
P eralatan Kom puter Komputer PC Lap Top PROCUREMENT WISMP I - TA. 2009 DINAS PU PENGAIRAN PROPINSI JAWA TIMUR
Halaman 3 dari 10 Lembar
Estimasi Biaya NO
KODE
UNIT ORGANISASI, NAMA PAKET, JENIS PEKERJAAN/PENGADAAN
1
2
3 Scanner Printer Laser Speaker Active Jaringan LAN
4
Gd4
Alat Kom unikasi Pengadaan Handy Talky Antena Rig
5
Gd5
BALAI PSAWS BENGAWAN SOLO , BOJONEGORO
IX
Gd1
Gd2
Pengadaan kendaraan roda 2
P eralatan Kantor / M eubelair Meja Kerja
4
Pengumuman Pengadaan
Pemasukan Penawaran
Eval / Nego
Penanda tanganan kontrak
6
7
8
9
10
11
Jangka Keteran gan / Waktu Kontrak Permas alahan 12 13
4 13,000,000 1,771,000 740,000 13,250,000
5 1,529.412 208.353 87.059 1,558.824
18,000,000 12,000,000 1,500,000 4,500,000
2,117.647 1,411.765 176.471 529.412
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
5,525,000
650.000
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
93,188,000
10,963.294
40,000,000
4,705.882
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
15,947,000
1,876.118
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
1,500,000
176.471
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
450,000
52.941
Meja Komputer
1,292,000
152.000
Filling Kabinet
2,875,000
338.235
Lemari Rak
5,854,000
688.706
AC
3,976,000
467.765
Kursi Kerja
3
US $
Post / Prior Review
Kendaraan Berm otor
1
2
Peilschall
Rp
Metode Pengadaan
Gd3
Gd4
17,000,000
2,000.000
Komputer PC
7,500,000
882.353
Lap Top
9,500,000
1,117.647
3,000,000
352.941
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
7,241,000
851.882
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
10,000,000
1,176.471
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
405,325,000
47,685.294
NS
Post Review
17-Feb-09
23 Feb s.d. 02 Mar 09
10-Mar-09
15 Hari
17-Feb-09
23 Feb s.d. 02 Mar 09
10-Mar-09
15 Hari
23 Feb s.d. 02 Mar 09
10-Mar-09
60 Hari
23 Feb s.d. 02 Mar 09
10-Mar-09
15 Hari
23 Feb s.d. 02 Mar 09
10-Mar-09
15 Hari
P eralatan Kom puter
Alat Kom unikasi Radio HT
5
Gd5
Jaringan LAN
Gd5
Bahan swakelola untuk perbaikan bangunan pengukur debit
6
Bahan Bangunan
BALAI PSAWS MADURA ( PAMEKASAN )
X 1
Gd1
Kendaraan Berm otor
170,000,000
20,000.000
130,000,000
15,294.118
Pengadaan kendaraan roda 4 Pick Up Pengadaan kendaraan roda 2
40,000,000
4,705.882
NS
Post Review
Feb-09 Feb-09
17-Feb-09 2
Gd2
P eralatan Hidrologi Automatic Water Level Recordder (AWLR) Bangunan Rumah AWLR
3
4
Gd3
Gd4
120,000,000
14,117.647
59,500,000 60,500,000
7,000.000 7,117.647
P eralatan Jaringan
6,000,000
705.882
Pengadaan Jaringan LAN
6,000,000
705.882
P eralatan Hidrologi
49,825,000
5,861.765
Spectometer Desikator Labu ukur 1000 ml Gelas ukur 1000 ml Pipet mesuring Glass Pyrex 10 ml
20,000,000 3,500,000 12,750,000 3,750,000 75,000
2,352.941 411.765 1,500.000 441.176 8.824
PROCUREMENT WISMP I - TA. 2009 DINAS PU PENGAIRAN PROPINSI JAWA TIMUR
NS
Post Review
Feb-09
17-Feb-09 17-Feb-09 17-Feb-09 17-Feb-09
NS
Post Review
Feb-09
17-Feb-09 17-Feb-09 17-Feb-09
NS
Post Review
Feb-09
17-Feb-09
Halaman 4 dari 10 Lembar
Estimasi Biaya NO
KODE
UNIT ORGANISASI, NAMA PAKET, JENIS PEKERJAAN/PENGADAAN
1
2
3 Botol timbang Pyrex Botol BOD Bak pencuci peralatan
5
Gd5
8
9
10
11
NS
Post Review
Feb-09
17-Feb-09
23 Feb s.d.02 Mart 2009
10-Mar-09
Pos Pos Pos Pos Pos Pos Pos Pos Pos Pos Pos Pos Pos
May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09
May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09
May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09
Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09
90 90 90 90 90 90 90 90 90 90 90 90 90
Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari
May-09 May-09 Apr-09 Apr-09 Apr-09 Apr-09 Apr-09 Apr-09
May-09 May-09 Apr-09 Apr-09 Apr-09 Apr-09 Apr-09 Apr-09
May-09 May-09 Apr-09 Apr-09 Apr-09 Apr-09 Apr-09 Apr-09
Jun-09 Jun-09 May-09 May-09 May-09 May-09 May-09 May-09
90 90 60 60 60 60 60 60
Hari Hari Hari Hari Hari Hari Hari Hari
May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09
May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09
May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09
Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09
60 60 60 60 60 60 60 60 60 60 60 60 60
Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari
10,633,120,000
15 Hari
1,250,955.294 157,647.059 16,470.588 11,764.706 11,764.706 11,764.706 11,764.706 11,764.706 11,764.706 11,764.706 11,764.706 11,764.706 11,764.706 11,764.706 11,764.706
SW SW SW SW SW SW SW SW SW SW SW SW SW
127,058.824 29,411.765 27,058.824 11,764.706 11,764.706 11,764.706 11,764.706 11,764.706 11,764.706
NCB NCB SW SW SW SW SW SW
Pengaman Tangkis K. Kintelan Ds Balong Mojo Kec Puri Kab. Mjk Perb. K. Swideng Desa Swideng Kec Trowulan Kab. Mojokerto Perb. Afvour tinggar Ds Tinggar Kec Bangsal Kab. Mojokerto Perb. Afvour tinggar Ds Jumeneng Kec Mojoanyar Kab. Mjkto Perb. Afvour Anak sungai tekuk Ds Jumeneng Kec Mojoanyar Kab. Mjkto Pengaman tangkis Kali Gembolo Ds Jabon tegal Mojo Kec Pungging Kab. Mjk Perbaikan Kali Cemporat Desa Japan Kec Sooko Kab. Mojokerto Pengaman tanggul Kali Kambing Ds Corat Kec Gempol Kab. Pasuruan Perbaikan Kali Sumber Glogok Ds Modopuro Kec Bangsal Kab. Mojokerto Perbaikan Kali Tekuk Desa Salen Kec Bangsal Kab. Mojokerto Perbaikan Kali Tekuk Desa Tinggar Kec Bangsal Kab. Mojokerto Perbaikan Kali Sumber Kembar Ds Kebon dalem Kec Mojosari Kab. Mojokerto Perbaikan Kali Marmoyo, Ds. Smbr Nongko, Kec Ngusikan, Kab. Jombang
1,118,120,000 90,900,000 90,900,000 86,360,000 86,360,000 86,360,000 86,360,000 86,360,000 86,360,000 86,360,000 86,360,000 86,360,000 86,360,000 72,720,000
131,543.529 10,694.118 10,694.118 10,160.000 10,160.000 10,160.000 10,160.000 10,160.000 10,160.000 10,160.000 10,160.000 10,160.000 10,160.000 8,555.294
SW SW SW SW SW SW SW SW SW SW SW SW SW
BALAI PSAWS GEMBONG PEKALEN ( PASURUAN )
1,250,000,000
147,058.824
226,000,000 208,000,000 198,000,000 198,000,000 210,000,000 210,000,000
26,588.235 24,470.588 23,294.118 23,294.118 24,705.882 24,705.882
NCB SW SW SW SW SW
Prior Kontrak I Post Review Post Review Post Review Post Review Post Review
May-09 May-09 May-09 May-09 May-09 May-09
May-09 May-09 May-09 May-09 May-09 May-09
May-09 May-09 May-09 May-09 May-09 May-09
Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09
90 90 90 90 90 90
Hari Hari Hari Hari Hari Hari
875,000,000 155,000,000 160,000,000 217,000,000 215,000,000
102,941.176 18,235.294 18,823.529 25,529.412 25,294.118
SW SW NCB NCB
Post Review Post Review Prior Kontrak I Prior Kontrak I
Apr-09 Apr-09 Apr-09 Apr-09
Apr-09 Apr-09 Apr-09 Apr-09
Apr-09 Apr-09 Apr-09 Apr-09
May-09 May-09 May-09 May-09
90 90 90 90
Hari Hari Hari Hari
CW1 CW2 CW3 CW4 CW5 CW6
Perkuatan Tebing Kali Welang Ds. Kebotohan, Kec. Kraton, Kab. Pasuruan Perkuatan Tebing Kali Welang Ds. Mulyorejo, Kec. Kraton, Kab. Pasuruan Perkuatan tebing kanan K. Kedung Larangan Ds. Manarui, Kec. Bangil, Kab. Pasuruan Perkuatan tebing kiri K. Petung Ds. Sekarputih, Kec. Gondangwetan, Kab. Pasuruan Perkuatan tebing K. Gembong Ds. Purutrejo, Kec. Purworejo, Kab. Pasuruan Perkuatan tebing K. Gembong Ds. Kandang sapi, Kec. Purworejo, Kab. Pasuruan
CW1 CW2 CW3 CW4
Perbaikan K. Asem Perbaikan K. Jatiroto Perbaikan K. Banger Perbaikan K. Banger I
BALAI PSAWS BONDOYUDO MAJANG ( LUMAJANG )
V
7
1,340,000,000 140,000,000 100,000,000 100,000,000 100,000,000 100,000,000 100,000,000 100,000,000 100,000,000 100,000,000 100,000,000 100,000,000 100,000,000 100,000,000 1,080,000,000 250,000,000 230,000,000 100,000,000 100,000,000 100,000,000 100,000,000 100,000,000 100,000,000
BALAI PSAWS BUNTUNG PAKETINGAN ( SURABAYA )
IV
6
7,000.000
CW.1 CW.2 CW.3 CW.4 CW.5 CW.6 CW.7 CW.8 CW.9 CW.10 CW.11 CW.12 CW.13
III
Jangka Keteran gan / Waktu Kontrak Permas alahan 12 13
29.412 882.353 235.294
7,000.000
BALAI PSAWS PUNCU SELODONO ( KEDIRI ) Perbaikan Kali Bangi, Kab. Kediri Perbaikan Kali Kresek, Kab. Kediri Perbaikan Kali Tawang, Kab. Kediri Perbaikan Kali Tawang, Kota Kediri Perbaikan Kali Termas Lama, Kab. Kediri Perbaikan Kali Bruno, Kota Kediri Perbaikan Kali Kedak, Kota Kediri Perbaikan Kali Kedungsoko, Kab. Nganjuk
Penanda tanganan kontrak
5
250,000 7,500,000 2,000,000 59,500,000
CW.1 CW.2 CW.3 CW.4 CW.5 CW.6 CW.7 CW.8
II
Eval / Nego
US $
59,500,000
BALAI PSAWS BANGO GEDANGAN ( MALANG ) Pemel. K. Bajal Picisan Kab. Tulungagung Pemel. K. Karang Tuwo, Kab. Tulungagung Pemel. K. Wedi Kab. Blitar Pemel. Kali Klantur Kab. Tulungagung Pemel. Kali Jari Kab. Blitar Pemel. Kali Ngasinan kanan, Kab. Trenggalek Pemel. Kali Bodo Kab. Malang Pemel. Kali Bagong Kab. Trenggalek Pemel. Kali Amprong Kab. Malang Pemel. Kali Mati Kab. Malang Pemel. Kali Kajar Kab. Malang Pemel. Kali Abab Kab. Malang Pemel. Kali Mewek , Kab. Malang
Pemasukan Penawaran
4
M onitoring Bendungan
CW.1 CW.2 CW.3 CW.4 CW.5 CW.6 CW.7 CW.8 CW.9 CW.10 CW.11 CW.12 CW.13
I
Pengumuman Pengadaan
Rp
Automatic Water Level Recordder (AWLR)
RIM A ( CATEGORY 5 )
Post / Prior Review
Metode Pengadaan
PROCUREMENT WISMP I - TA. 2009 DINAS PU PENGAIRAN PROPINSI JAWA TIMUR
Review Review Review Review Review Review Review Review Review Review Review Review Review
Prior Kontrak I Prior Kontrak I Pos Review Pos Review Pos Review Pos Review Pos Review Pos Review
Post Post Post Post Post Post Post Post Post Post Post Post Post
Review Review Review Review Review Review Review Review Review Review Review Review Review
Halaman 5 dari 10 Lembar
Estimasi Biaya NO
KODE
UNIT ORGANISASI, NAMA PAKET, JENIS PEKERJAAN/PENGADAAN
1
2 CW5
3
VI CW1
Perbaikan K. Tanggul BALAI PSAWS SAMPEAN BARU BONDOWOSO Perbaikan Tangkis K. Deluwang Desa Gunung Malang, Kec. Suboh, Kab. Situbondo
Rp
US $
Metode Pengadaan
Post / Prior Review
Pengumuman Pengadaan
Pemasukan Penawaran
Eval / Nego
Penanda tanganan kontrak
Jangka Keteran gan / Waktu Kontrak Permas alahan 12 13 90 Hari
4 128,000,000
5 15,058.824
6 SW
7 Post Review
8 Apr-09
9 Apr-09
10 Apr-09
11 May-09
1,300,000,000 200,000,000
152,941.176 23,529.412
SW
Post Review
Apr-09
Apr-09
Apr-09
May-09
90 Hari
CW2
Perbaikan Tangkis K. Bajulmati (Situbondo) Desa Wonorejo, Kec. Banyuputih,Kab Situbondo Kab. Situbondo
200,000,000
23,529.412
SW
Post Review
Apr-09
Apr-09
Apr-09
May-09
90 Hari
CW3
Perbaikan Tangkis K. Deluwang Desa Ketah, Kec. Suboh, Kab. Bondowoso
200,000,000
23,529.412
SW
Post Review
Apr-09
Apr-09
Apr-09
May-09
90 Hari
CW4
Perbaikan Tangkis K. Suger Desa Maesan, Kec. Maesan, Kab. Bondowoso
150,000,000
17,647.059
SW
Post Review
Apr-09
Apr-09
Apr-09
May-09
90 Hari
CW5
Perbaikan Tangkis K. Clangap Desa Alas Sumur, Kec. Pujer, Kab. Bondowoso
150,000,000
17,647.059
SW
Post Review
Apr-09
Apr-09
Apr-09
May-09
90 Hari
CW6
Perbaikan Tangkis K. Bajulmati Desa Bimorejo, Kec. Wongsorejo, Kab. Banyuwangi
200,000,000
23,529.412
SW
Post Review
Apr-09
Apr-09
Apr-09
May-09
90 Hari
CW7
Perbaikan Tangkis K. Bomo Desa Parijatah,Kaligung, Kec. Rogojampi, Kab. Banyuwangi
200,000,000
23,529.412
SW
Post Review
Apr-09
Apr-09
Apr-09
May-09
90 Hari
NCB
Prior Review Kontrak I
Apr-09
Apr-09
Apr-09
May-09
90 Hari
NCB
Prior Review Kontrak I
Apr-09
Apr-09
Apr-09
May-09
90 Hari
NCB
Prior Review Kontrak I
Apr-09
Apr-09
Apr-09
May-09
90 Hari
BALAI PSAWS MADIUN - MADIUN
VII CW1 CW2 CW3 CW4 CW5
Perbaikan Kali Mayong Kab.Ponorogo Perbaikan Kali Gandong Kab. Magetan + Kab.Madiun Perbaikan Kali slahung Kab.Ponorogo Perbaikan Kali Catur Kab. Madiun Perbaikan Kali Purwosari Kab. Madiun
BALAI PSAWS BENGAWAN SOLO , BOJONEGORO
VIII CW1 CW2 CW3 CW4 CW5 CW6 CW7
Perbaikan Checkdam Kali Mekuris Desa Pesen Kec. Kanor Kab. Bojonegoro Perbaikan Tebing Kanan Kali Mekuris Desa Kedungrejo Kec. Sumberejo Kab. Bojonegoro Perbaikan Tebing Kiri Kali Kening Desa Kluncing Kec. Parengan Kab. Tuban Pengerukan Kali Kedungbajul Desa Campurejo Kec. Bojonegoro Kab. Bojonegoro Perbaikan Tebing Kanan Kali Pacal Desa Senganten Kec. Gondang Kab. Bojonegoro Perbaikan Tebing Kiri Kali Pacal Desa Klepek Kec. Sukosewu Kab. Bojonegoro Perbaikan Tebing Kiri Kali Kening Desa Suciharjo Kec. Parengan Kab. Tuban BALAI PSAWS MADURA ( PAMEKASAN )
IX
Belanja Biaya P em eliharaan Jaringan CW1 CW2 CW3 CW4 CW5
Rehabilitasi bangunan ukur debit (DI Tunjung) Rehabilitasi bangunan ukur debit (DI Umbul) Rehabilitasi bangunan ukur debit (DI Klampis) Rehabilitasi bangunan ukur debit (DI Samiran) Rehabilitasi bangunan ukur debit (DI Jepun)
CW6 CW7 CW8 CW9 CW10 CW11
Pemel. dan Perb. Kali Jambu Ds. Langkap, Kec. Socah Kab. Bangkalan Pemel. dan Perb. Kali Sokrah Ds. Poreh, Kec. Lenteng, Kab. Sumenep Pemel. dan Perb. Kali Klampis Ds. Asemraja, Kec. Torjun Kab. Sampang Pemel. dan Perb. K. Pendi Ds. Konang, Kec. Konang, Kab. Pamekasan Pemel. dan Perb. K. Grujugan Ds. Grujugan, Kec. Larangan, Kab. Pamekasan Pemel. dan Perb. K. Sokrah Ds. Cangkreng, Kec. Lenteng, Kab. Sumenep
Belanja Biaya P em eliharaan Jaringan Yang Dikapitalisasi
RIM B ( CATEGORY 6 ) PROCUREMENT WISMP I - TA. 2009 DINAS PU PENGAIRAN PROPINSI JAWA TIMUR
1,230,000,000
144,706
250,000,000
29,411.765
250,000,000 250,000,000
29,411.765 29,411.765
280,000,000
32,941.176
NCB
200,000,000
23,529.412
SW
Prior Review Kontrak I Post Review
1,500,000,000 400,000,000
176,470.588 47,058.824
NCB
Prior Kontrak I
Apr-09
Apr-09
Apr-09
May-09
90 Hari
220,000,000
25,882.353
NCB
Prior Kontrak I
Apr-09
Apr-09
Apr-09
May-09
90 Hari
205,000,000
24,117.647
SW
Post Review
Apr-09
Apr-09
Apr-09
May-09
90 Hari
150,000,000
17,647.059
SW
Post Review
Apr-09
Apr-09
Apr-09
May-09
90 Hari
200,000,000
23,529.412
SW
Post Review
Apr-09
Apr-09
Apr-09
May-09
90 Hari
220,000,000
25,882.353
NCB
Prior Kontrak I
Apr-09
Apr-09
Apr-09
May-09
90 Hari
105,000,000
12,352.941
SW
Post Review
Apr-09
Apr-09
Apr-09
May-09
90 Hari
940,000,000
Apr-09
Apr-09
Apr-09
May-09
90 Hari
Apr-09
Apr-09
Apr-09
May-09
90 Hari
110,588.235
90,000,000 15,000,000 15,000,000 22,500,000 22,500,000 15,000,000
10,588.235 1,764.706 1,764.706 2,647.059 2,647.059 1,764.706
SW SW SW SW SW
Post Post Post Post Post
Review Review Review Review Review
Apr-09 Apr-09 Apr-09 Apr-09 Apr-09
Apr-09 Apr-09 Apr-09 Apr-09 Apr-09
Apr-09 Apr-09 Apr-09 Apr-09 Apr-09
May-09 May-09 May-09 May-09 May-09
60 60 60 60 60
Hari Hari Hari Hari Hari
850,000,000 200,000,000 200,000,000 150,000,000 100,000,000 100,000,000 100,000,000
100,000.000 23,529.412 23,529.412 17,647.059 11,764.706 11,764.706 11,764.706
SW SW SW SW SW SW
Post Post Post Post Post Post
Review Review Review Review Review Review
Apr-09 Apr-09 Apr-09 Apr-09 Apr-09 Apr-09
Apr-09 Apr-09 Apr-09 Apr-09 Apr-09 Apr-09
Apr-09 Apr-09 Apr-09 Apr-09 Apr-09 Apr-09
May-09 May-09 May-09 May-09 May-09 May-09
60 60 60 60 60 60
Hari Hari Hari Hari Hari Hari
2,014,392,200
236,987.318 Halaman 6 dari 10 Lembar
Estimasi Biaya NO
KODE
UNIT ORGANISASI, NAMA PAKET, JENIS PEKERJAAN/PENGADAAN
1
2
3 BALAI PSAWS BANGO GEDANGAN ( MALANG )
I CW1
Pemeliharaan Kali Putih Kab. Blitar
Post / Prior Review
Pengumuman Pengadaan
Pemasukan Penawaran
Eval / Nego
Penanda tanganan kontrak
8
9
10
11
Rp
US $
Metode Pengadaan
4
5
6
7
Jangka Keteran gan / Waktu Kontrak Permas alahan 12 13
77,222,000
9,084.941
67866000
7,984.235
NS
Pos Review
Mar-09
Mar-09
Apr-09
60 Hari
5,433,000
639.176
NS
Pos Review
Mar-09
Mar-09
Apr-09
60 Hari
3,923,000
461.529
NS
Pos Review
Mar-09
Mar-09
Apr-09
60 Hari
230,056,200
27,065.435
80,511,200
9,471.906
NS
Pos Review
Mar-09
Mar-09
Apr-09
60 Hari
73,535,000
8,651.176
NS
Pos Review
Mar-09
Mar-09
Apr-09
60 Hari
76,010,000
8,942.353
NS
Pos Review
Mar-09
Mar-09
Apr-09
60 Hari
270,492,240
31,822.616
(Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni) CW2
Normalisasi Pembuang Sobrah Kab. Trenggalek (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
CW3
Normalisasi K. Jati Kab Trenggalek (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni) BALAI PSAWS PUNCU SELODONO ( KEDIRI )
II CW.1
Pemeliharaan Kali Bendokrosok (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
CW.2
Pemeliharaan Kali Bakung (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
CW.3
Pemeliharaan Kali Kolokoso (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni) BALAI PSAWS BUNTUNG PAKETINGAN ( SURABAYA )
III CW1
Kali Bangsal Desa Ngarjo Kec. Mojoanyar Kab. Mojokerto (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
69,699,855
8,199.983
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
CW2
Kali Sadar Desa Kwatu Kec. Mojoanyar Kab. Mojokerto (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
62,227,880
7,320.927
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
CW3
Kali Kintelan Desa Banjaragung Kec. Puri Kab. Mojokerto (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
8,035.056
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
CW4
Kali Gembolo Desa Guwo Kec. Pungging Kab. Mojokerto (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
70,266,530
8,266.651
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
194,855,760
22,924.207
BALAI PSAWS GEMBONG PEKALEN ( PASURUAN )
IV
68,297,975
CW1
Pemeliharaan/Perkuatan Tebing K. Kedung Larangan (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
45,577,620
5,362.073
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
CW2
Pembuatan Parapet K. Petung (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
50,037,680
5,886.786
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
CW3
Perbaikan/Perkuatan Tebing K. Cerame (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
48,248,860
5,676.336
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
CW4
Perbaikan/Perkuatan Tebing K. Welang (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
50,991,600
5,999.012
NS
Post Review
Apr-09
Apr-09
May-09
30 Hari
PROCUREMENT WISMP I - TA. 2009 DINAS PU PENGAIRAN PROPINSI JAWA TIMUR
Halaman 7 dari 10 Lembar
Estimasi Biaya NO
KODE
1 V
2
CW1
UNIT ORGANISASI, NAMA PAKET, JENIS PEKERJAAN/PENGADAAN 3 BALAI PSAWS BONDOYUDO MAJANG ( LUMAJANG ) K. Bondoyudo
Rp
US $
Metode Pengadaan
Post / Prior Review
Pengumuman Pengadaan
Pemasukan Penawaran
Eval / Nego
Penanda tanganan kontrak
6
7
8
9
10
11
Jangka Keteran gan / Waktu Kontrak Permas alahan 12 13
4 264,650,000
5 31,135.294
49,630,000
5,838.824
NS
Post Review
Apr-09
Apr-09
May-09
60 Hari
49,630,000
5,838.824
NS
Post Review
Apr-09
Apr-09
May-09
60 Hari
49,630,000
5,838.824
NS
Post Review
Apr-09
Apr-09
May-09
60 Hari
49,630,000
5,838.824
NS
Post Review
Apr-09
Apr-09
May-09
60 Hari
49,630,000
5,838.824
NS
Post Review
Apr-09
Apr-09
May-09
60 Hari
16,500,000
1,941.176
NS
Post Review
Apr-09
Apr-09
May-09
60 Hari
272,000,000
32,000.000
(Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni) CW2
K. Bedadung (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
CW3
K. Jatiroto (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
CW4
K. Tanggul (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
CW5
K. Krai (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
CW6
Rehabiltasi bangunan pengukur debit BALAI PSAWS SAMPEAN BARU - BONDOWOSO
VI CW1
Perbaikan Tangkis Kali Bluncong (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
73,429,000
8,638.706
NS
Post Review
Apr-09
Apr-09
May-09
60 Hari
CW2
Perbaikan Tangkis K. Tlogo (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
56,595,650
6,658.312
NS
Post Review
Apr-09
Apr-09
May-09
60 Hari
CW3
Kegiatan Phisik Untuk Kali Bajulmati (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
56,595,650
6,658.312
NS
Post Review
Apr-09
Apr-09
May-09
60 Hari
CW4
Rehabiltasi bangunan pengukur debit
10,000,000
1,176.471
NS
Post Review
Apr-09
Apr-09
May-09
60 Hari
57,846,000
6,805.412
BALAI PSAWS MADIUN - MADIUN
VII
Bahan Bangunan 1
CW1
Perbaikan K. Piring Kab. Madiun (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
99,998,000
11,764.471
NS
Post Review
Apr-09
Apr-09
May-09
60 Hari
2
CW2
Perbaikan K. Piring Kota Madiun (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
99,998,000
11,764.471
NS
Post Review
Apr-09
Apr-09
May-09
60 Hari
57,846,000
6,805.412
NS
Post Review
Apr-09
Apr-09
May-09
60 Hari
280,150,000
32,958.824
92,250,000 96,400,000 91,500,000
10,852.941 11,341.176 10,764.706
NS NS NS
Post Review Post Review Post Review
Apr-09 Apr-09 Apr-09
Apr-09 Apr-09 Apr-09
May-09 May-09 May-09
90 hari 90 hari 90 hari
367,120,000
43,190.588
3
CW3
R ehabilitasi Bangunan P engukur Debit
-
(Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni) VIII 1 2 3
IX
BALAI PSAWS BENGAWAN SOLO - BOJONEGORO
CW 1 CW 2 CW 3
Belanja Biaya Pemeliharaan Lainnya Perb. Tanggul Kn K, Mekuris, Ds. Pesen, Kec Kanor Kab. Bojonegoro Perb. Tebing K. Kening, Ds Suciharjo, Kec. Parengan Kab. Tuban Per. Tebing K., Kening, Ds. Cengkong, Kec. Parengan Kab. Tuban
BALAI PSAWS MADURA ( PAMEKASAN ) PROCUREMENT WISMP I - TA. 2009 DINAS PU PENGAIRAN PROPINSI JAWA TIMUR
Halaman 8 dari 10 Lembar
Estimasi Biaya
Post / Prior Review
Pengumuman Pengadaan
Pemasukan Penawaran
Eval / Nego
Penanda tanganan kontrak
8
9
10
11
Jangka Keteran gan / Waktu Kontrak Permas alahan 12 13
Rp
US $
Metode Pengadaan
4
5
6
7
Pemeliharaan dan Perbaikan kali Asemtanto Ds. Umbul, Kec. Arosbaya Kab. Bangkalan
73,424,000
8,638.118
NS
Post Review
16-Mar-09
10-16 Mart 08
24-Mar-09
20 Hari
Batu gunung Kawat galvanize. Tabalan rumput Kayu Dolken / Jati D>10 cm L=3m
14,475,000 57,749,000 375,000 825,000
1,702.941 6,794.000 44.118 97.059
Pemeliharaan dan Perbaikan Kali Tambangan Ds. Arosbaya, Kec. Arosbaya Kab. Bangkala
73,424,000
8,638.118
NS
Post Review
16-Mar-09
10-16 Mart 08
24-Mar-09
20 Hari
Batu gunung Kawat galvanize. Tabalan rumput Kayu Dolken / Jati D>10 cm L=3m
14,475,000 57,749,000 375,000 825,000
1,702.941 6,794.000 44.118 97.059
Pemeliharaan dan Perbaikan Kali Tambangan Ds. Klampis, Kec. Arosbaya Kab. Bangkalan
73,424,000
8,638.118
NS
Post Review
16-Mar-09
10-16 Mart 08
24-Mar-09
20 Hari
Batu gunung Kawat galvanize. Tabalan rumput Kayu Dolken / Jati D>10 cm L=3m
14,475,000 57,749,000 375,000 825,000
1,702.941 6,794.000 44.118 97.059
Pemeliharaan dan Perbaikan Kali Blega Ds. Blega, Kec. Blega Kab. Bangkalan
73,424,000
8,638.118
NS
Post Review
16-Mar-09
10-16 Mart 08
24-Mar-09
20 Hari
Batu gunung Kawat galvanize. Tabalan rumput Kayu Dolken / Jati D>10 cm L=3m
14,475,000 57,749,000 375,000 825,000
1,702.941 6,794.000 44.118 97.059
Pemeliharaan dan Perbaikan Kali Klampis Ds. Kara, Kec. Torjun Kab. Sampang
73,424,000
8,638.118
NS
Post Review
16-Mar-09
10-16 Mart 08
24-Mar-09
20 Hari
Batu gunung Kawat galvanize. Tabalan rumput Kayu Dolken / Jati D>10 cm L=3m
14,475,000 57,749,000 375,000 825,000
1,702.941 6,794.000 44.118 97.059
1,397,500,000
164,412 Apr-09
May-09
May-09
May-09
90 Hari
Apr-09
May-09
May-09
May-09
90 Hari
NO
KODE
UNIT ORGANISASI, NAMA PAKET, JENIS PEKERJAAN/PENGADAAN
1
2
3
1
CW1
Belanja Biaya Pemeliharaan Jaringan Yang Dikapitalisasi
2
3
4
5
CW2
CW3
CW4
CW5
Sub Proyek A 1. ( Category 7 ) DINAS PU PROPINSI JAWA TIMUR
I
Konstruksi 1
CW1
Rehabilitasi DI Ketandan Kabupaten Kediri (1.637 Ha.)
650,000,000
76,470.588
NCB
2
CW2
Rehabilitasi DI Ranugrati Kab. Pasuruan (1.088 Ha.)
747,500,000
87,941.176
NCB
II
Prior Review kontrak I Prior Review kontrak I
Kegiatan Yang Dibiayai GOI (Paralel Financing/APBD)
( Category 5 ) I
DINAS PU PROPINSI JAWA TIMUR Rehabilitasi DI aposan, Kab. Pprobolinggo Rehabilitasi DI Plered Kab. Pasuruan
240,000,000 280,000,000
L L
-
Apr-09 Apr-09
Apr-09 Apr-09
Apr-09 Apr-09
May-09 May-09
90 Hari 90 Hari
II PEAN BARU - BONDOWOSO 1
Perbaikan Tangkis K. Bluncong Desa Pandak, Kec. Klabang, Kab. Bondowoso
95,000,000
PML
-
Apr-09
Apr-09
Apr-09
May-09
90 Hari
2
Perbaikan Tangkis K. Tlogo Desa Bercak, Kec. Cerme, Kab. Bondowoso
94,000,000
PML
-
Apr-09
Apr-09
Apr-09
May-09
90 Hari
3
Perbaikan Tangkis K. Deluwang Desa Dawuhan, Kec. Suboh, Kab. Situbondo
95,000,000
PML
-
Apr-09
Apr-09
Apr-09
May-09
90 Hari
4
Perbaikan Tangkis K. Deluwang Desa Dawuhan, Kec. Suboh, Kab. Situbondo
95,000,000
PML
-
Apr-09
Apr-09
Apr-09
May-09
90 Hari
90,000,000
PML
-
Apr-09
Apr-09
Apr-09
May-09
90 Hari
III 1
BALAI PSAWS BENGAWAN SOLO , BOJONEGORO Pengamanan Pos Duga Air (AWLR) Desa Kedung Jambangan Kec. Bangilan, Kab. Tuban PROCUREMENT WISMP I - TA. 2009 DINAS PU PENGAIRAN PROPINSI JAWA TIMUR
Halaman 9 dari 10 Lembar
Estimasi Biaya NO
KODE
UNIT ORGANISASI, NAMA PAKET, JENIS PEKERJAAN/PENGADAAN
1
2
3
Post / Prior Review
Pengumuman Pengadaan
Pemasukan Penawaran
Eval / Nego
Penanda tanganan kontrak
Jangka Keteran gan / Waktu Kontrak Permas alahan 12 13
Rp
US $
Metode Pengadaan
4
5
6
7
8
9
10
11
7,000,000
PL
-
Apr-09
Apr-09
Apr-09
May-09
90 Hari
2
Perbaikan Tempat Cuci Kualitas`Air
IV
BALAI PSAWS MADIUN - MADIUN Perbaikan K. Brangkal Kab. Madiun
150,000,000
L
-
May-09
May-09
May-09
Jun-09
90 Hari
Perbaikan K. Tinil Kab. Ngawi
150,000,000
L
-
May-09
May-09
May-09
Jun-09
90 Hari
Perbaikan K. Galok Kab. Ponorogo
100,000,000
PML
-
May-09
May-09
May-09
Jun-09
60 hari
95,000,000
PML
-
May-09
May-09
May-09
Jun-09
60 hari
80,000,000
PML
-
May-09
May-09
May-09
Jun-09
60 hari
95,000,000 95,000,000 95,000,000 95,000,000 80,000,000
PML PML PML PML PML
Feb-09 Feb-09 Feb-09 Feb-09 Feb-09
Feb-09 Feb-09 Feb-09 Feb-09 Feb-09
Mar-09 Mar-09 Mar-09 Mar-09 Mar-09
Mar-09 Mar-09 Mar-09 Mar-09 Mar-09
60 Hari 60 Hari 60 Hari 60 Hari 60 Hari
95,000,000 100,000,000 90,000,000 90,000,000 90,000,000
PML PML PML PML PML
Apr-09 Apr-09 Apr-09 Apr-09 Apr-09
Apr-09 Apr-09 Apr-09 Apr-09 Apr-09
Apr-09 Apr-09 Apr-09 Apr-09 Apr-09
May-09 May-09 May-09 May-09 May-09
60 Hari 60 Hari 60 Hari 60 Hari 60 Hari
100,000,000 100,000,000 100,000,000 100,000,000 90,000,000
PML PML PML PML PML
18-24 Peb. 18-24 Peb. 18-24 Peb. 18-24 Peb. 18-24 Peb.
25-Mar-09 25-Mar-09 25-Mar-09 25-Mar-09 25-Mar-09
20-Apr-09
60 Hari
25 Maret s/d 03 Mei 2009
May-09
May-09
Jun-09
30 Hari
V
BALAI PSAWS GEMBONG PEKALEN ( PASURUAN ) Perkuatan Tebing K. Sumberpinang Desa. Sidogiri, Kec Kraton Kab.Pasuruan Perkuatan Tebing K. Laweyan Desa. Wates`Tani, Kec. Nguling Kab. Pasuruan
VI
BALAI PSAWS BUNTUNG PAKETINGAN ( SURABAYA ) Kali Kali Kali Kali Kali
VII 1 2 3 4 5 VIII
Sumber Ngrayung Desa Salen Kec Bangsal Kab. Mojokerto Sumber Ngrayung Desa Ngrowo Kec Bangsal Kab. Mojokerto Janjing bawah Desa Kembang Ringgit Kec.Pungging Kab Mojokerto Sumber Glogok Desa Modopuro Kec Mojosari Kab. Mojokerto Kedung sumur Desa Terusan Kec Gedeg Kab. Mojokerto
BALAI PSAWS PUNCU SELODONO ( KEDIRI ) Pemeliharaan Kali Bakung Kab. Kediri Pemeliharaan Kali Bendokrosok Kab. Kediri Pemeliharaan Kali Kolokoso Kab. Kediri Pemeliharaan Kali Kedak Kota Kediri Pemeliharaan Kali Kresek Kota Kediri BALAI PSAWS MADURA ( PAMEKASAN )
P AR ALEL AN GGAR AN AP BD I Pemel. dan Perb. K. Pemel. dan Perb. K. Pemel. dan Perb. K. Pemel. dan Perb. K. Pemel. dan Perb. K.
Blega Ds. Blega, Kec. Blega Kab. Bangkalan Jambu Ds. Blega, Kec. Blega Kab. Bangkalan Klampis Ds. Beringin Nonggal, Kec. Torjun Kab. Sampang Panyepen Ds. Tambelangan, Kec. Tambelangan Kab. Sampang Kloang Ds. Gladak Anyar, Kec. Pamekasan, Kab. Pamekasan
2009 2009 2009 2009 2009
( Category 6 ) IX
BALAI PSAWS MADIUN - MADIUN Perbaikan K. Sono Kab. Madiun
PROCUREMENT WISMP I - TA. 2009 DINAS PU PENGAIRAN PROPINSI JAWA TIMUR
49,974,974
PL
-
May-09
Halaman 10 dari 10 Lembar
LEMBAR KERJA WISMP I TAHUN ANGGARAN 2009 DINAS PEKERJAAN UMUM PENGAIRAN PROPINSI JAWA TIMUR BALAI PSAWS GEMBONG PEKALEN , PASURUAN PERHITUNGAN URAIAN PENGELUARAN
:
KODE SATKER DIPA BAGIAN PELAKSANAAN KEGIATAN
: :
DEPARTEMEN / LEMBAGA TAHUN ANGGARAN
: Dinas Pekerjaan Umum Pengairan Propinsi Jawa Timur. : 2009
Kode Satker / Program / Kegiatan/ Sub Kegiatan/ MAK. 1
PART. A PENINGKATAN PENGELOLAAN SDA WILAYAH SUNGAI. A2. KEMAMPUAN INSTITUSI PENGELOLA SUMBERDAYA AIR WILAYAH SUNGAI A.2.3 A.2.3.1
PENGELOLAAN DAN PRASARANA SUMBERDAYA AIR WILAYAH SUNGAI PENGELOLAAN HIDROLOGI
Total Biaya
Kegiatan / Sub Kegiatan / Jenis Belanja / Rincian Belanja
Volume
Harga satuan ( Rp )
Jumlah Harga satuan ( Rp )
LOAN ( Rp )
APBD PARALLEL ( Rp )
APBD MURNI ( Rp.)
2
3
4
3
5
6
7
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
56,055,000
56,055,000
5,625,000 40,500,000 4,050,000 3,000,000 2,880,000
5,625,000 40,500,000 4,050,000 3,000,000 2,880,000
40,000,000
40,000,000
40,000,000
40,000,000
40,000,000
40,000,000
Sistem Informasi Manajemen Pengelolaan SDA Wilayah Sungai dan Irigasi Tingkat Wilayah Sungai
#REF!
S#REF! b
J#REF! li 2008
#REF!
Menyediakan Fasilitas Ruangan, dan Anggaran Operasional Unit SIM yang Telah Dibentuk berdasarkan SK, Kepala Dinas PUP
#REF!
#REF!
24,788,000
24,788,000
1,292,000 2,800,000 11,000,000 9,696,000
1,292,000 2,800,000 11,000,000 9,696,000
#REF!
#REF!
8,514,000
8,514,000
1,400,000 689,000 3,055,000 3,370,000
1,400,000 689,000 3,055,000 3,370,000
#REF! 6,500,000
S b #REF! 6,500,000
J li 2008 #REF!
#REF!
6,500,000
6,500,000
3,000,000 1,000,000 2,500,000
3,000,000 1,000,000 2,500,000
142,791,240
142,791,240
142,791,240
142,791,240
142,791,240
142,791,240 S b #REF!
J li 2008 #REF!
#REF!
S
J li 2008
A.2.3. A.2.3.1.
PENGELOLAAN DAN PRASARANA SUMBERDAYA AIR WILAYAH SUNGAI Pengelolaan Hidrologi (Subdit OP SDW)
A.2.3.1.3
Pelaksanaan rasionalisasi jaringan hidrologi termasuk perbaikan bangunan stasiun, pergantian dan pembelian peralatan hidrologi II Belanja Modal Peralatan dan Mesin (KPPN 032/05.13/REG.10705701 ) Peralatan Hidrologi ARR Hujan Gelas Penakar Hujan 100 Cm 2 Pagar Pengaman Penakar Hujan di 5 (Lima)Lokasi Syphon Glass Rain Recorder ( Gelas Syphon) Gembok dan Kunci Pengaman penakar hujan Service jam ARR
A 2.3.1.7
A.2.2.1
II Belanjan Modal Peralatan dan Mesin (KPPN 031/05.13.REG.10705701 ) Meja Komputer Filling Kabinet Lemari Rak Printer Laser A.2.2.2
125,000 900,000 270,000 30,000 480,000
=
= = = =
2 Bh
2 2 2 2
bh bh bh bh
2
2 2 2 2
20,000,000
646,000 1,400,000 5,500,000 4,848,000
= = = =
4 1 5 1
Unit Unit Unit bh
4 1 5 1
350,000 689,000 611,000 3,370,000
= = =
5 Set 2 Set 1 Set
5 2 1
600,000 500,000 2,500,000
Peningkatan dan rehabilitasi bangunan pengukur debit (rekomendasi Tim Teknis BWRM propinsi). I Belanja Biaya Pemeliharaan Jaringan (KPPN.031/05.51/Reg.10705701) Rehabiltasi bangunan pengukur debit
A.4.1 A.4.2
45 45 15 100 6
Pengelolaan dan Prasarana Sumber daya Air wilayah Sungai Pelaksanaan dan Peningkatan Alokasi Air Pada Wilayah Sungai Penyediaan peralatan sistim komunikasi untuk kebutuhan pengumpuilan data ketersediaan air yang real time I Belanja Barang Modal Peralatan dan mesin (KPPN.031/05.51/Reg.10705701) Pengadaan Handy Talky Antena Rig
A 2.3.2.6
Bh M2 Bh Set Bh
Penyediaan jaringan global berbasis perangkat keras dan perangkat lunak (rekomendasi speksifikasi teknis oleh Subdit Data dan Informasi SDA) II Belanja Modal Peralatan dan Mesin (KPPN 031/05.13.REG.10705701 ) Stavolt 500 VA Wireless-G PCI Card with speed Booster Bluetootch USB Adapter UPS
A.2.3 A.2.3.2 A 2.3.2.4
45 45 15 100 6
Pengadaan kendaraan lapangn selama APL-I terdiri dari 1 mobil pick-up dan 2 sepeda motor. I Belanja Modal Peralatan dan Mesin (KPPN 031/05.13.REG.10705701 ) Pengadaan kendaraan roda 2
A.2.2
= = = = =
Manajemen Pemeliharaan Prasarana Sungai Rehabilitasi Prasarana Sungai yang diprioritaskan
=
1 Paket
1
142,791,240
#REF!
b
halaman 1 dari 4
A.4.2.1
RIM - A Sub Projects
A. 4.2.1.4 Pelaksanaan pekerjaan perbaikan/rehabilitasi prasarana sungai yang dikontrakan, dengan mengikut sertakan staf Balai dalam pelaksanaan pekerjaan (On the Job Training)
A.4.2.2.5
IV.
#REF! 1,425,000,000
#REF! 1,250,000,000
1 Perkuata
1 Paket
1
226,000,000
226,000,000
226,000,000
2 Perkuata
1 Paket
1
208,000,000
208,000,000
208,000,000
3 Perkuata
1 Paket
1
198,000,000
198,000,000
198,000,000
4 Perkuata
1 Paket
1
198,000,000
198,000,000
198,000,000
5 Perkuata
1 Paket
1
210,000,000
210,000,000
210,000,000
6 Perkuata
1 Paket
1
210,000,000
210,000,000
210,000,000
7 Perkuata
1 Paket
1
175,000,000
175,000,000
Melaksanakan pekerjaan perbaikan/rehabilitasi prasana sungai secara swakelola ( teknis maupun bio engineering ).
#REF!
Belanja Biaya Pemeliharaan Jaringan yang dikapitalisasi (KPPN.031/05.51/Reg.10705701)
#REF! 175,000,000
#REF!
175,000,000
#REF!
194,855,760
194,855,760
Pemeliharaan/Perkuatan Tebing K. Kedung Larangan - Batu Kali - Pasir - Porland Cement
= = =
150 M3 67 M3 424 Zak
150 67 424
94,050 100,760 58,300
14,107,500 6,750,920 24,719,200
14,107,500 6,750,920 24,719,200
Pembuatan Parapet K. Petung - Batu Kali - Pasir - Porland Cement
= = =
160 M3 73 M3 474 Zak
160 73 474
94,050 100,760 58,300
15,048,000 7,355,480 27,634,200
15,048,000 7,355,480 27,634,200
Perbaikan/Perkuatan Tebing K. Cerame - Batu Kali - Pasir - Porland Cement
= = =
158 M3 71 M3 450 Zak
158 71 450
94,050 100,760 58,300
14,859,900 7,153,960 26,235,000
14,859,900 7,153,960 26,235,000
Perbaikan/Perkuatan Tebing K. Welang - Batu Kali - Pasir - Porland Cement
= = =
168 M3 75 M3 474 Zak
168 75 474
94,050 100,760 58,300
15,800,400 7,557,000 27,634,200
15,800,400 7,557,000 27,634,200
Surabaya, Juli 2008 Plt. Kepala Balai PSAWS Gembong Pekalen Pasuran selaku Pejabat Pembuat Komitmen
BUANG , Dipl.IV ATP, MM Pembina NIP. 510 053 313
halaman 2 dari 4
LEMBAR KERJA WISMP I TAHUN ANGGARAN 2009 DINAS PEKERJAAN UMUM PENGAIRAN PROPINSI JAWA TIMUR BALAI PSAWS GEMBONG PEKALEN , PASURUAN PERHITUNGAN URAIAN PENGELUARAN
:
KODE SATKER DIPA BAGIAN PELAKSANAAN KEGIATAN
: :
DEPARTEMEN / LEMBAGA TAHUN ANGGARAN
: Dinas Pekerjaan Umum Pengairan Propinsi Jawa Timur. : 2009
Kode Satker / Program / Kegiatan/ Sub Kegiatan/ MAK. 1 A.2.3 A.2.3.4 A 2.3.4.1
PART. A PENINGKATAN PENGELOLAAN SDA WILAYAH SUNGAI. A2. KEMAMPUAN INSTITUSI PENGELOLA SUMBERDAYA AIR WILAYAH SUNGAI A.2.3 A.2.3.4
PENGELOLAAN DAN PRASARANA SUMBERDAYA AIR WILAYAH SUNGAI PENGELOLAAN BANJIR
Total Biaya
Kegiatan / Sub Kegiatan / Jenis Belanja / Rincian Belanja
Volume
Harga satuan ( Rp )
Jumlah Harga satuan ( Rp )
LOAN ( Rp )
APBD PARALLEL ( Rp )
APBD MURNI ( Rp.)
2
3
4
3
5
6
7
Pengelolaan dan Prasarana Sumber daya Air wilayah Sungai Pengelolaan Banjir Pelatihan staf Balai PSDA mengenai permodelan HEC-RAS segmen sungai yang rawan banjir dan pembuatan peta daerah genangan banjir sesuai program pelatihan dalam APL I..
I Biaya Perjalanan Lainnya (KPPN.031/05.51/Reg.10705701) Perjalanan dinas dalam propinsi dalam rangka Pengiriman Pelatihan ke Balai Bojonegoro Golongan III 12 Uang Harian 4 org x 3 hr x 1 kl = 12 OHK 4 Transportasi 4 org x 1 kl = 4 OK A 2.3.4.2
350,000 100,000
Melaksanakan pelatihan dan praktik pengelolaan prasarana banjir sesuai program pelatihan dalam APL I. I Biaya Perjalanan Lainnya (KPPN.031/05.51/Reg.10705701) Perjalanan dinas dalam propinsi dalam rangka Pengiriman Pelatihan ke Balai Bojonegoro Golongan III 12 Uang Harian 4 org x 3 hr x 1 kl = 12 OHK 4 Transportasi 4 org x 1 kl = 4 OK
A 2.3.4.3
Pemasangan dan Pengoperasian sistem peramalan dan peringatan banjir serta mencatat dan memproses data banjir termasuk pengukuran aliran I Belanja Modal Peralatan dan Mesin (KPPN.031/05.51/Reg.10705701) Mistar Ukur Alat Peringatan Dini
A 2.3.4.5
350,000 100,000
Survei bangunan pra banjir, berkaitan dengan penanggulangan banjir..
= =
70 M 6 Unit
70 6
400,000 5,000,000
kesiagaan dan rencana
I Belanja Bahan (KPPN.031/05.51/Reg.10705701)
Kertas HVS 80 gr F4 Kertas HVS 80 gr A4 Kertas Bufalo
= = = = = = =
Plak band 2' Refill Ink (Modifikasi) Foto copy, Penggandaan Laporan, dll Dokumentasi
II. Biaya Perjalanan Lainnya (KPPN.031/05.51/Reg.10705701) Perjalanan dinas Balai - Kabupaten dalam rangka Koordinasi Golongan IV : 2 kl = Uang harian 1 org x 1 hr x Transportasi 1 org x 2 kl = Golongan III : Uang harian 2 org x 1 hr x 2 kl = Transportasi 2 org x 2 kl = Perjalanan dinas dalam rangka kegiatan survey Golongan III : Uang harian 2 org x 1 hr x Transportasi 2 org x 7 kl Golongan II : Uang harian 1 org x 1 hr x Transportasi 1 org x 8 kl
5 5 1 5 1 1 1
Rim Rim pak Bh Bh Keg Keg
5 5 1 5 1 1 1
35,000 32,000 42,000 10,800 250,000 Ls Ls
99,053,000 4,600,000
99,053,000 4,600,000
4,600,000
4,600,000
4,600,000
4,600,000
4,200,000 400,000
4,200,000 400,000
4,600,000
4,600,000
4,600,000
4,600,000
4,600,000
4,600,000
4,200,000 400,000
4,200,000 400,000
58,000,000
58,000,000
58,000,000
58,000,000
28,000,000 30,000,000
28,000,000 30,000,000
12,853,000
12,853,000
1,653,000
1,653,000
175,000 160,000 42,000 54,000 250,000 722,000 250,000
175,000 160,000 42,000 54,000 250,000 722,000 250,000
11,200,000
11,200,000
2,400,000
2,400,000
2 OHK 2 OK
2 2
350,000 50,000
700,000 100,000
700,000 100,000
4 OHK 4 OK
4 4
350,000 50,000
1,400,000 200,000
1,400,000 200,000
8,800,000
8,800,000
7 kl
= =
14 OHK 14 OK
14 14
350,000 50,000
4,900,000 700,000
4,900,000 700,000
8 kl
= =
8 OHK 8 OK
8 8
350,000 50,000
2,800,000 400,000
2,800,000 400,000
-
halaman 3 dari 4
-
Kode Satker / Program / Kegiatan/ Sub Kegiatan/ MAK. 1 A 2.3.4.6
Total Biaya
Kegiatan / Sub Kegiatan / Jenis Belanja / Rincian Belanja
Volume
Harga satuan ( Rp )
Jumlah Harga satuan ( Rp )
LOAN ( Rp )
APBD PARALLEL ( Rp )
APBD MURNI ( Rp.)
2
3
4
3
5
6
7
Survei bangunan pasca banjir, berkaitan dengan rencana pemeliharaanya , rapid flood impact assessment (penilaian dampak banjir yang segera terjadi) dan pelaporan penanggulangan banjir oleh Balai PSDA.
I Belanja Bahan (KPPN.031/05.51/Reg.10705701)
Kertas HVS 80 gr F4 Kertas HVS 80 gr A4
= = = = = = = =
Stop map Plak band 2' Catridge Canon warna Catridge Canon Black Foto Copy,Cetak dan penggandaan Dokumentasi
6 Rim 6 Rim 10 Bh 5 Bh 1 Bh 1 Bh 1 Keg 1 Keg
6 6 10 5 1 1 1 1
35,000 32,000 1,540 10,800 350,000 320,000 Ls Ls
II. Biaya Perjalanan Lainnya (KPPN.031/05.51/Reg.10705701) Perjalanan dinas ke propinsi dalam rangka Koordinasi Golongan IV : Uang Harian Transportasi Golongan III : Uang harian Transportasi (PP)
19,000,000
19,000,000
1,900,000
1,900,000
210,000 192,000 15,400 54,000 350,000 320,000 508,600 250,000
210,000 192,000 15,400 54,000 350,000 320,000 508,600 250,000
17,100,000
17,100,000
2,700,000
2,700,000
1 org 1 org
x x
1 hr 2 kl
x
2 kl
= =
2 OHK 2 OK
2 2
350,000 100,000
700,000 200,000
700,000 200,000
2 org 2 org
x x
1 hr 2 kl
x
2 kl
= =
4 OHK 4 OK
4 4
350,000 100,000
1,400,000 400,000
1,400,000 400,000
14,400,000
14,400,000
Perjalanan dinas dalam propinsi dalam rangka survey Golongan III : Uang Harian 3 org x 1 hr x 6 kl Transportasi 3 org x 6 kl Golongan II : Uang Harian 3 org x 1 hr x 6 kl Transportasi 3 org x 6 kl
= =
18 OHK 18 OK
18 18
350,000 50,000
6,300,000 900,000
6,300,000 900,000
= =
18 OHK 18 OK
18 18
350,000 50,000
6,300,000 900,000
6,300,000 900,000
Surabaya, Juli 2008 Plt. Kepala Balai PSAWS Gembong Pekalen Pasuran selaku Pejabat Pembuat Komitmen
BUANG , Dipl.IV ATP, MM Pembina NIP. 510 053 313
halaman 4 dari 4
LEMBAR KERJA ALOKASI BIAYA KOMPONEN A PENGELOLAAN SUMBERDAYA AIR WILAYAH SUNGAI UNTUK CORE BALAI RINGKASAN PROGRAM KERJA TAHUN ANGGARAN 2009 BALAI PSAWS MADURA DI PAMEKASAN Kode Satker / Program / Kegiatan/ Sub Kegiatan/ MAK 1
Total Biaya Kegiatan / Sub Kegiatan / Jenis Belanja / Rincian Belanja
2
A.2 A.2.3. A.2.3.1.
KEMAMPUAN INSTITUSI PENGELOLA SUMBERDAYA AIR WILAYAH SUNGAI PENGELOLAAN DAN PRASARANA SUMBERDAYA AIR WILAYAH SUNGAI Pengelolaan Hidrologi (Subdit OP SDW)
A.2.3.1.3
IV
A 2.3.1.6
II
A.2 A.2.2 A.2.2.2
III
A.2.3 A.2.3.2
Vol.
Harga satuan ( Rp )
Jumlah Harga satuan ( Rp )
LOAN ( Rp )
APBD PARALLEL ( Rp )
APBD MURNI ( Rp.)
4
3
5
6
7
8
290,000,000
290,000,000
Pelaksanaan rasionalisasi jaringan hidrologi termasuk perbaikan bangunan stasiun, pergantian dan pembelian peralatan hidrologi
120,000,000
120,000,000
Belanja Modal Peralatan dan Mesin (KPPN 032/05.13/REG.10705701 ) AWLR (mesin) AWLR (Konstruksi)
120,000,000
120,000,000
45,000,000 75,000,000
45,000,000 75,000,000
Pengadaan kendaraan lapangn selama APL-I terdiri dari 1 mobil pick-up dan 2 sepeda motor.
170,000,000
170,000,000
Belanja Modal Peralatan dan Mesin (KPPN 031/05.13.REG.10705701 ) Pengadaan kendaraan roda 4 Pick Up Pengadaan kendaraan roda 2
170,000,000
170,000,000
130,000,000 40,000,000
130,000,000 40,000,000
1 1
= =
1 Bh 2 Bh
1 2
45,000,000 75,000,000
130,000,000 20,000,000
KEMAMPUAN INSTITUSI PENGELOLA SUMBERDAYA AIR WILAYAH SUNGAI Sistem Informasi Manajemen Pengelolaan SDA Wilayah Sungai dan Irigasi Tingkat Wilayah Sungai Penyediaan jaringan global berbasis perangkat keras dan perangkat lunak (rekomendasi speksifikasi teknis oleh Subdit Data dan Informasi SDA) Belanja Modal Peralatan dan Mesin (KPPN 031/05.13.REG.10705701 ) Pengadaan Jaringan
=
1 Keg
145,825,000 6,000,000
1
Pengelolaan dan Prasarana Sumber daya Air wilayah Sungai Pelaksanaan dan Peningkatan Alokasi Air Pada Wilayah Sungai
A 2.3.2.4.6 Peningkatan dan rehabilitasi bangunan pengukur debit (rekomendasi Tim Teknis BWRM propinsi). IV
A.2.3 A.2.3.3. A.2.3.3.7 III
A.4
Belanja Biaya Pemeliharaan Jaringan (KPPN.031/05.51/Reg.10705701) Rehabilitasi bangunan ukur debit (DI Tunjung) Rehabilitasi bangunan ukur debit (DI Umbul) Rehabilitasi bangunan ukur debit (DI Klampis) Rehabilitasi bangunan ukur debit (DI Samiran) Rehabilitasi bangunan ukur debit (DI Jepun)
= = = = =
2 2 3 3 2
Bh Bh Bh Bh Bh
2 2 3 3 2
7,500,000 7,500,000 7,500,000 7,500,000 7,500,000
PENGELOLAAN DAN PRASARANA SUMBERDAYA AIR WILAYAH SUNGAI Pengelolaan Kualitas Air Pada Wilayah Sungai
#REF! #REF!
6,000,000
6,000,000
6,000,000 6,000,000
6,000,000
139,825,000 90,000,000
139,825,000 90,000,000
90,000,000
90,000,000
90,000,000
90,000,000
15,000,000 15,000,000 22,500,000 22,500,000 15,000,000
15,000,000 15,000,000 22,500,000 22,500,000 15,000,000
49,825,000 49,825,000
49,825,000 49,825,000
6,000,000
Penyelesaian prasarana dan peralatan laboratorium kualitas air
49,825,000
49,825,000
Belanja Modal Peralatan dan Mesin (KPPN 031/05.13.REG.10705701 ) Spectometer Desikator Labu ukur 1000 ml Gelas ukur 1000 ml Pipet mesuring Glass Pyrex 10 ml Botol timbang Pyrex Botol BOD Bak pencuci peralatan
49,825,000
49,825,000
20,000,000 3,500,000 12,750,000 3,750,000 75,000 250,000 7,500,000 2,000,000
20,000,000 3,500,000 12,750,000 3,750,000 75,000 250,000 7,500,000 2,000,000
= = = = = = = =
1 1 15 15 1 2 15 1
Bh Bh Bh Bh Bh Bh Bh Bh
1 1 15 15 1 2 15 1
20,000,000 3,500,000 850,000 250,000 75,000 125,000 500,000 2,000,000
PEMELIHARAAN PRASARANA SUNGAI
1,840,000,000
1,350,000,000
A.4.2.1.4
Pelaksanaan pekerjaan perbaikan prasarana sungai yang dikontrakan dengan mengikut sertakan staf Balai PSDA dalam pelaksanaan pekerjaan (on the job training)
1,340,000,000
850,000,000
A.4.2.1.5
Melaksanakan pekerjaan perbaikan/rehabilitasi prasana sungai secara swakelola (teknis maupun bio engineering).
500,000,000
500,000,000
Pamekasan,
Juni 2008
Kepala Balai Pengelolaan Sumberdaya Air Wilayah Sungai Madura - Pamekasan Selaku Pejabat Pembuat Komitmen
HASBULLAH, ST. MM. Pembina NIP. 510 084 894
Page 1 of 1
LEMBAR KERJA ALOKASI BIAYA KOMPONEN A PENGELOLAAN SUMBERDAYA AIR WILAYAH SUNGAI UNTUK CORE BALAI RINGKASAN PROGRAM KERJA TAHUN ANGGARAN 2009 BALAI PSAWS BENGAWAN SOLO - BOJONEGORO Total Biaya
Kode Satker / Program / Kegiatan/ Sub Kegiatan/ MAK. 1 A.2 A.2.3. A.2.3.1.
Kegiatan / Sub Kegiatan / Jenis Belanja / Rincian Belanja
2
Vol.
Harga satuan ( Rp )
Jumlah Harga satuan ( Rp )
LOAN ( Rp )
APBD PARALLEL ( Rp )
APBD MURNI ( Rp.)
4
3
5
6
7
8
#REF!
#REF!
KEMAMPUAN INSTITUSI PENGELOLA SUMBERDAYA AIR WILAYAH SUNGAI PENGELOLAAN DAN PRASARANA SUMBERDAYA AIR WILAYAH SUNGAI Pengelolaan Hidrologi (Subdit OP SDW)
A 2.3.1.7 Pengadaan kendaraan lapangn selama APL-I terdiri dari 1 mobil pick-up dan 2 sepeda motor.
170,000,000
170,000,000
170,000,000
170,000,000
130,000,000 40,000,000
130,000,000 40,000,000
KEMAMPUAN INSTITUSI PENGELOLA SUMBERDAYA AIR WILAYAH SUNGAI
132,688,000
132,688,000
Sistem Informasi Manajemen Pengelolaan SDA Wilayah Sungai dan Irigasi Tingkat Wilayah Sungai
132,688,000
132,688,000
Menyediakan Fasilitas Ruangan, dan Anggaran Operasional Unit SIM yang Telah Dibentuk berdasarkan SK, Kepala Dinas PUP
125,447,000
125,447,000
Belanjan Modal Peralatan dan Mesin (KPPN 031/05.13.REG.10705701 ) Penyiapan Ruangan SIM Meja Kerja Kursi Kerja Meja Komputer Filling Kabinet Lemari Rak AC Komputer PC Lap Top
125,447,000
125,447,000
92,500,000 1,500,000 450,000 1,292,000 2,875,000 5,854,000 3,976,000 7,500,000 9,500,000
92,500,000 1,500,000 450,000 1,292,000 2,875,000 5,854,000 3,976,000 7,500,000 9,500,000
Penyediaan jaringan global berbasis perangkat keras dan perangkat lunak (rekomendasi speksifikasi teknis oleh Subdit Data dan Informasi SDA)
7,241,000
7,241,000
Belanja Modal Peralatan dan Mesin (KPPN 031/05.13.REG.10705701 ) LAN Card
7,241,000
7,241,000
7,241,000
7,241,000
Pelaksanaan dan Peningkatan Alokasi Air Pada Wilayah Sungai
13,000,000
13,000,000
A 2.3.2.4 Penyediaan peralatan sistem komunikasi untuk kebutuhan pengumpulan data ketersediaan air yang real time
3,000,000
3,000,000
3,000,000
3,000,000
3,000,000
3,000,000
10,000,000
10,000,000
10,000,000
10,000,000
10,000,000
10,000,000
I
A.2 A.2.2
A.2.2.1
II
A.2.2.2
III
A.2.3 A.2.3.2
I
Belanja Modal Peralatan dan Mesin (KPPN 031/05.13.REG.10705701 ) Pengadaan kendaraan roda 4 Pick Up Pengadaan kendaraan roda 2
= =
1 Bh 2 Bh
= = = = = = = = =
=
1 3 3 2 2 1 1 1 1
Unit bh bh bh bh bh bh bh bh
13 Unit
1 2
1 3 3 2 2 1 1 1 1
13
130,000,000 20,000,000
49,693,500 500,000 150,000 646,000 1,437,500 5,854,000 3,976,000 7,500,000 9,500,000
557,000
Pengelolaan dan Prasarana Sumber daya Air wilayah Sungai
Belanjan Modal Peralatan dan Mesin (KPPN 031/05.13.REG.10705701 ) Radio HT
=
1 Ls
1
3,000,000
A 2.3.2.4.6 Peningkatan dan rehabilitasi bangunan pengukur debit (rekomendasi Tim Teknis BWRM propinsi). IV
Belanja Biaya Pemeliharaan Jaringan (KPPN.031/05.51/Reg.10705701) Bahan swakelola untuk perbaikan bangunan pengukur debit ( 1 Unit )
1
10,000,000
halaman 1 dari 2
Kode Satker / Program / Kegiatan/ Sub Kegiatan/ MAK. 1 A.2.3
Total Biaya
Kegiatan / Sub Kegiatan / Jenis Belanja / Rincian Belanja
2
Vol.
Harga satuan ( Rp )
Jumlah Harga satuan ( Rp )
4
3
5
LOAN ( Rp )
APBD PARALLEL ( Rp )
APBD MURNI ( Rp.)
6
7
8
PENGELOLAAN DAN PRASARANA SUMBERDAYA AIR WILAYAH SUNGAI
A.2.3.3.
Pengelolaan Kualitas Air Pada Wilayah Sungai
A.2.3.3.7 Penyelesaian prasarana dan peralatan laboratorium kualitas air III
7,000,000
7,000,000
7,000,000
7,000,000
7,000,000
7,000,000
PEMELIHARAAN PRASARANA SUNGAI
2,175,800,000
2,175,800,000
Rehabilitasi Prasarana Sungai yang diprioritaskan
2,175,800,000
2,175,800,000
Belanja Biaya Pemeliharaan Lainnya (KPPN 031/05.13.REG.10705701 ) Pemeliharaan/penggantian peralatan kualitas air Perbaikan Tempat Pencucian Peralatan Kualitas Air
A.4
=
1 Unit
1
7,000,000
PEMELIHARAAN PRASARANA SUNGAI
A.4.1
Manajemen Pemeliharaan Prasarana Sungai
A.4 A.4.2 A.4.2.1
RIM - A Sub Projects
A.4.2.1.4 Pelaksanaan pekerjaan perbaikan prasarana sungai yang dikontrakan dengan mengikut sertakan staf Balai PSDA dalam pelaksanaan pekerjaan (on the job training)
2,175,800,000
2,175,800,000
2,175,800,000
2,175,800,000
Belanja Gedung Peralatan dan Bangunan (KPPN.031/05.51/Reg.10705701) 1 Perbaikan Checkdam Kali Mekuris
1 Paket
1
400,000,000
400,000,000
400,000,000
2
1 Paket
1
220,000,000
220,000,000
220,000,000
1 Paket
1
205,000,000
205,000,000
205,000,000
1 Paket
1
150,000,000
150,000,000
150,000,000
1 Paket
1
200,000,000
200,000,000
200,000,000
1 Paket
1
190,000,000
190,000,000
190,000,000
3 4 5 6 7 8 9 10
= Desa Pesen Kec. Kanor Kab. Bojonegoro Perbaikan Tebing Kanan Kali Mekuris = Desa Kedungrejo Kec. Sumberejo Kab. Bojonegoro Perbaikan Tebing Kiri Kali Kening = Desa Kluncing Kec. Parengan Kab. Tuban Pengerukan Kali Kedungbajul = Desa Campurejo Kec. Bojonegoro Kab. Bojonegoro Perbaikan Tebing Kanan Kali Pacal = Desa Senganten Kec. Gondang Kab. Bojonegoro Perbaikan Tebing Kiri Kali Pacal = Desa Klepek Kec. Sukosewu Kab. Bojonegoro Perbaikan Tebing Kiri Kali Kening = Desa Suciharjo Kec. Parengan Kab. Tuban Perbaikan Tebing Kanan Kali Kening = Desa Kumpulrejo Kec. Parengan Kab. Tuban Perbaikan Tebing Kanan Kali Pacal = Desa Padang Mentoyo Kec. Temayang Kab. Bojonegoro Perbaikan Tebing Kanan Kali Kening = Desa Margorejo Kec. Parengan Kab. Tuban
1 Paket
1
190,000,000
190,000,000
190,000,000
1 Paket
1
210,800,000
210,800,000
210,800,000
1 Paket
1
215,000,000
215,000,000
215,000,000
1 Paket
1
195,000,000
195,000,000
195,000,000
Bojonegoro,
Juni 2008
Kepala Balai Pengelolaan Sumberdaya Air Wilayah Sungai Bengawan Solo - Bojonegoro Selaku Pejabat Pembuat Komitmen
Ir. PUDJO BUNTORO, ME. Pembina NIP. 110 035 725
halaman 2 dari 2
LEMBAR KERJA ALOKASI BIAYA KOMPONEN A PENGELOLAAN SUMBERDAYA AIR WILAYAH SUNGAI UNTUK CORE BALAI RINGKASAN PROGRAM KERJA TAHUN ANGGARAN 2009 BALAI PSAWS MADIUN - MADIUN Kode Satker / Program / Kegiatan/ Sub Kegiatan/ MAK. 1 A.2 A.2.3. A.2.3.1.
Total Biaya
Kegiatan / Sub Kegiatan / Jenis Belanja / Rincian Belanja
2
Vol.
Harga satuan ( Rp )
Jumlah Harga satuan ( Rp )
4
3
5
A.2 A.2.2
A.2.2.1 II
A.2.2.2
I
A.2.3 A.2.3.2
PENGELOLAAN DAN PRASARANA SUMBERDAYA AIR WILAYAH SUNGAI Pengelolaan Hidrologi (Subdit OP SDW)
6
7
8
170,000,000
170,000,000
170,000,000
170,000,000
170,000,000
130,000,000 40,000,000
130,000,000 40,000,000
Sistem Informasi Manajemen Pengelolaan SDA Wilayah Sungai dan Irigasi Tingkat Wilayah Sungai
46,276,000
46,276,000
Menyediakan Fasilitas Ruangan, dan Anggaran Operasional Unit SIM yang Telah Dibentuk berdasarkan SK, Kepala Dinas PUP
46,276,000
46,276,000
Belanjan Modal Peralatan dan Mesin (KPPN 031/05.13.REG.10705701 ) Meja Kerja Kursi Kerja Kursi Eselon Almari Besi Meja Komputer AC Komputer PC Lap Top Scanner Printer Laser (HP Laser Jet, 1020) Speaker Active Simbadda Keyboard Logitech
46,276,000
46,276,000
1,000,000 300,000 5,496,000 9,750,000 1,292,000 7,952,000 7,500,000 9,500,000 751,000 1,771,000 774,000 190,000
1,000,000 300,000 5,496,000 9,750,000 1,292,000 7,952,000 7,500,000 9,500,000 751,000 1,771,000 774,000 190,000
13,250,000
13,250,000
13,250,000
13,250,000
8,250,000 5,000,000
8,250,000 5,000,000
Pengelolaan dan Prasarana Sumber daya Air wilayah Sungai
57,846,000
57,846,000
Pelaksanaan dan Peningkatan Alokasi Air Pada Wilayah Sungai
57,846,000
57,846,000
18,000,000
18,000,000
18,000,000
18,000,000
12,000,000 1,500,000 4,500,000
12,000,000 1,500,000 4,500,000
57,846,000
57,846,000
57,846,000
57,846,000
17,025,000 31,416,000 9,405,000
17,025,000 31,416,000 9,405,000
Belanja Modal Peralatan dan Mesin (KPPN 031/05.13.REG.10705701 ) Pengadaan kendaraan roda 4 Pick Up Pengadaan kendaraan roda 2
= =
1 Bh 2 Bh
1 2
130,000,000 20,000,000
KEMAMPUAN INSTITUSI PENGELOLA SUMBERDAYA AIR WILAYAH SUNGAI
= = = = = = = = = = = =
2 2 3 3 2 2 1 1 1 1 2 1
bh bh bh bh bh bh bh bh bh bh bh bh
2 2 3 3 2 2 1 1 1 1 2 1
500,000 150,000 1,832,000 3,250,000 646,000 3,976,000 7,500,000 9,500,000 751,000 1,771,000 387,000 190,000
Penyediaan jaringan global berbasis perangkat keras dan perangkat lunak ( rekomendasi spesifikasi teknis oleh NPIU/ Subdit . Data dan Informasi ) Belanja Modal Peralatan dan mesin (KPPN.031/05.51/Reg.10705701) Komputer PC Printer laserjet
= =
1 bh 1 bh
1 1
8,250,000 5,000,000
Belanja Barang Modal Peralatan dan mesin (KPPN.031/05.51/Reg.10705701) Pengadaan Handy Talky Antena Rig
= = =
3 Set 3 Bh 3 Bh
3 3 3
4,000,000 500,000 1,500,000
A 2.3.2.6 Peningkatan dan rehabilitasi bangunan pengukur debit (rekomendasi Tim Teknis BWRM propinsi). IV
APBD MURNI ( Rp.)
170,000,000
A 2.3.2.4 Penyediaan peralatan sistim komunikasi untuk kebutuhan pengumpuilan data ketersediaan air yang real time I
APBD PARALLEL ( Rp )
KEMAMPUAN INSTITUSI PENGELOLA SUMBERDAYA AIR WILAYAH SUNGAI
A 2.3.1.7 Pengadaan kendaraan lapangn selama APL-I terdiri dari 1 mobil pick-up dan 2 sepeda motor. I
LOAN ( Rp )
Belanja Biaya Pemeliharaan Jaringan (KPPN.031/05.51/Reg.10705701) Batu Kali PC Pasir
= = =
227 M3 616 Zak 99 M3
227 616 99
75,000 51,000 95,000
A.4
PEMELIHARAAN PRASARANA SUNGAI
1,960,142,673
1,960,142,673
A.4.2
Rehabilitasi Prasarana Sungai yang diprioritaskan
1,960,142,673
1,960,142,673
A.4.2.1
RIM - A Sub Projects
1,960,142,673
1,960,142,673
halaman 1 dari 2
A.4.2.1.4 Pelaksanaan Pekerjaan Perbaikan / Rehabilitasi Prasarana Sungai yang dikontrakkan dengan mengikut sertakan staf Balai PSDA dalam pelaksanaan Pekerjaan ( On The Job ) I 1 2 3 4 5
1,760,146,673
1,760,146,673
1,760,146,673
1,760,146,673
500,000,000 500,000,000 300,000,000 200,000,000 260,146,673
500,000,000 500,000,000 300,000,000 200,000,000 260,146,673
199,996,000
199,996,000
205,101,663
99,998,000 99,998,000
99,998,000 99,998,000
75,000 95,000 51,000
60,000,000 28,880,000 11,118,000
60,000,000 28,880,000 11,118,000
99,998,000 99,998,000
99,998,000 99,998,000
60,000,000 28,880,000 11,118,000
60,000,000 28,880,000 11,118,000
KEMAMPUAN INSTITUSI PENGELOLA SUMBER DAYA AIR WILAYAH SUNGAI
5,525,000
5,525,000
Pengelolaan dan Prasarana Sumber daya Air wilayah Sungai
5,525,000
5,525,000
Pengelolaan Banjir
5,525,000
5,525,000
5,525,000
5,525,000
5,525,000 5,525,000
5,525,000 5,525,000
Belanja Modal Bangunan (KPPN 032/05.13/REG.10705701 ) Perbaikan Kali Mayong Kab.Ponorogo Perbaikan Kali Gandong Kab. Magetan + Kab.Madiun Perbaikan Kali slahung Kab.Ponorogo Perbaikan Kali Catur Kab. Madiun Perbaikan Kali Purwosari Kab. Madiun
= = = = =
1 1 1 1 1
Paket Paket Paket Paket Paket
1 1 1 1 1
500,000,000 500,000,000 300,000,000 200,000,000 260,146,673
A.4.2.1.5 Melaksanakan pekerjaan perbaikan/rehabilitasi prasarana sungai secara swakelola (teknis maupun bio engineering)
IV
IV
A.2 A.2.3 A.2.3.4
Perbaikan K. Piring Kab. Madiun Belanja Modal bahan baku bangunan (KPPN 032/05.13/REG.10705701 ) - Batu Kali - Pasir - Porland Cement Perbaikan K. Piring Kota Madiun Belanja Modal bahan baku bangunan (KPPN 032/05.13/REG.10705701 ) - Batu Kali - Pasir - Porland Cement
= = =
= = =
800 M3 304 M3 218 Zak
800 M3 304 M3 218 Zak
800 304 218
800 304 218
75,000 95,000 51,000
A. 2.3.4.4 Pemasangan dan pemeliharaan flood gauges sesuai rekomendasi Tim Teknis BWRM Propinsi setelah dilakukan study rasional jaringan serta mencatat dan memproses data banjir termasuk pengukuran aliran III
Belanja Pemeliharaan Lainnya Peil schaal
=
13 M
13
425,000
Madiun,
Juni 2008
Kepala Balai Pengelolaan Sumberdaya Air Wilayah Sungai Madiun - Madiun Selaku Pejabat Pembuat Komitmen
Ir. HARIADI, Sp Pembina NIP.110 035 726
halaman 2 dari 2
LEMBAR KERJA ALOKASI BIAYA KOMPONEN A PENGELOLAAN SUMBERDAYA AIR WILAYAH SUNGAI UNTUK CORE BALAI RINGKASAN PROGRAM KERJA TAHUN ANGGARAN 2009 BALAI PSAWS SAMPEAN BARU - BONDOWOSO Kode Satker / Program / Kegiatan/ Sub Kegiatan/ MAK. 1 A.2
Total Biaya
Kegiatan / Sub Kegiatan / Jenis Belanja / Rincian Belanja
2
Vol.
Harga satuan ( Rp )
Jumlah Harga satuan ( Rp )
4
3
5
LOAN ( Rp )
APBD PARALLEL ( Rp )
APBD MURNI ( Rp.)
6
7
8
KEMAMPUAN INSTITUSI PENGELOLA SUMBERDAYA AIR WILAYAH SUNGAI
A.2.3.
PENGELOLAAN DAN PRASARANA SUMBERDAYA AIR WILAYAH SUNGAI
A.2.3.1. Pengelolaan Hidrologi (Subdit OP SDW) A 2.3.1.7 Pengadaan kendaraan lapangn selama APL-I terdiri dari 1 mobil pick-up dan 2 sepeda motor. I
Belanja Modal Peralatan dan Mesin (KPPN 031/05.13.REG.10705701 ) Pengadaan kendaraan roda 4 Pick Up Pengadaan kendaraan roda 2
= =
1 Bh 2 Bh
1 2
130,000,000 20,000,000
170,000,000
170,000,000
170,000,000
170,000,000
130,000,000 40,000,000
130,000,000 40,000,000
A.2
KEMAMPUAN INSTITUSI PENGELOLA SUMBERDAYA AIR WILAYAH SUNGAI
85,500,000
85,500,000
A.2.2
Sistem Informasi Manajemen Pengelolaan SDA Wilayah Sungai dan Irigasi Tingkat Wilayah Sungai
59,500,000
59,500,000
A.2.2.1
Menyediakan Fasilitas Ruangan, dan Anggaran Operasional Unit SIM yang Telah Dibentuk berdasarkan SK, Kepala Dinas PUP
47,000,000
47,000,000
Belanja Modal (KPPN.031/05.51/Reg.10705701) Kursi kerja dan Meja Kerja Kursi Rapat Meja Rapat
47,000,000
47,000,000
20,000,000 15,000,000 12,000,000
20,000,000 15,000,000 12,000,000
Penyediaan jaringan global berbasis perangkat keras dan perangkat lunak (rekomendasi speksifikasi teknis oleh Subdit Data dan Informasi SDA)
12,500,000
12,500,000
Belanja Modal Peralatan dan Mesin (KPPN 031/05.13.REG.10705701 ) Server
12,500,000
12,500,000
12,500,000
12,500,000
Pengelolaan dan Prasarana Sumber daya Air wilayah Sungai
26,000,000
26,000,000
Pelaksanaan dan Peningkatan Alokasi Air Pada Wilayah Sungai
26,000,000
26,000,000
16,000,000
16,000,000
16,000,000
16,000,000
16,000,000
16,000,000
10,000,000
10,000,000
10,000,000
10,000,000
10,000,000
10,000,000
PEMELIHARAAN PRASARANA SUNGAI
2,003,264,150
2,003,264,150
Rehabilitasi Prasarana Sungai yang diprioritaskan
2,003,264,150
2,003,264,150
RIM - A Sub Projects
2,003,264,150
2,003,264,150
1,816,643,200
1,816,643,200
II
A.2.2.2 III
A.2.3 A.2.3.2
= = =
=
10 unit 60 unit 10 unit
1 Bh
10 60 10
1
2,000,000 250,000 1,200,000
12,500,000
A 2.3.2.4 Penyediaan peralatan sistim komunikasi untuk kebutuhan pengumpuilan data ketersediaan air yang real time III
Belanja Barang Modal Peralatan dan mesin (KPPN.031/05.51/Reg.10705701) Pengadaan Handy Talky Antena
= =
5 Set
5
3,200,000
A 2.3.2.6 Peningkatan dan rehabilitasi bangunan pengukur debit (rekomendasi Tim Teknis BWRM propinsi). IV
Belanja Biaya Pemeliharaan Jaringan (KPPN.031/05.51/Reg.10705701) Rehabiltasi bangunan pengukur debit
A.4 A.4.2 A.4.2.1
=
2 Bh
2
5,000,000
A.4.2.1.4 Pelaksanaan pekerjaan perbaikan prasarana sungai yang dikontrakan dengan mengikut sertakan staf Balai PSDA dalam pelaksanaan pekerjaan (on the job training) 1 Perbaikan Tangkis Kali Deluwang Desa Gunung Malang, Kec. Suboh, Kab. Situbondo
=
1 Paket
1
200,000,000
200,000,000
200,000,000
2 Perbaikan Tangkis Kali Bajulmati (Situbondo) Desa Wonorejo, Kec. Banyuputih, Kab. Situbondo
=
1 Paket
1
200,000,000
200,000,000
200,000,000
3 Perbaikan Tangkis Kali Deluwang Desa Ketah, Kec. Suboh, Kab. Situbondo
=
1 Paket
1
200,000,000
200,000,000
200,000,000
4 Perbaikan Tangkis Kali Suger
=
1 Paket
1
200,000,000
200,000,000
200,000,000
#REF!
halaman 1 dari 2
Kode Satker / Program / Kegiatan/ Sub Kegiatan/ MAK. 1
Total Biaya
Kegiatan / Sub Kegiatan / Jenis Belanja / Rincian Belanja
2
Vol.
Harga satuan ( Rp )
Jumlah Harga satuan ( Rp )
4
3
5
LOAN ( Rp )
APBD PARALLEL ( Rp )
APBD MURNI ( Rp.)
6
7
8
#REF!
#REF!
Desa Maesan, Kec. Maesan, Kab. Bondowoso 5 Perbaikan Tangkis Kali Clangap Desa Alas sumur, Kec. Pujer, Kab. Bondowoso
=
1 Paket
1
200,000,000
200,000,000
200,000,000
6 Perbaikan Tangkis Kali Bajulmati (Banyuwangi) Desa Bimorejo, Kec. Wongsorejo, Kab. Banyuwangi
=
1 Paket
1
200,000,000
200,000,000
200,000,000
7 Perbaikan Tangkis Kali Bomo Desa Parijatah, Kaligung, Kec. Rogojampi, Kab. Banyuwangi
=
1 Paket
1
200,000,000
200,000,000
200,000,000
8 Perbaikan Tangkis Kali Kalibaru Desa Kedungdoro, Kec. Egalsari, Kab. Banyuwangi
=
1 Paket
1
93,643,200
93,643,200
93,643,200
9 Perbaikan Tangkis Kali Bluncong Desa Leprak, Kec. Klabang, Kab. Bondowoso
=
1 Paket
1
173,000,000
173,000,000
173,000,000
=
1 Paket
1
150,000,000
150,000,000
150,000,000
186,620,950
186,620,950
186,620,950
186,620,950
10 Perbaikan Tangkis Kali Arjasa Desa Suger Lor, Kec. Maesan, Kab. Bondowoso
A.4.2.1.5 Melaksanakan pekerjaan perbaikan/rehabilitasi prasana sungai secara swakelola (teknis maupun bio engineering). IV
A.2.6.4
III
Belanja Modal Bahan Bangunan Perbaikan Tangkis Kali Bluncong - Batu Kali - Pasir pasang - Portland cement (50 kg) - Paku - Patok kayu tahun - Cat meni
= = = = = =
329 145 543 0.5 0.01 0.5
M3 M3 Kg Kg M3 Kg
329 145 543 1 0 1
86,000 90,000 59,000 11,000 3,000,000 26,300
28,294,000 13,050,000 32,037,000 5,500 30,000 13,150
28,294,000 13,050,000 32,037,000 5,500 30,000 13,150
Kegiatan Phisik Untuk Kali Tlogo - Batu Kali - Pasir pasang - Portland cement (50 kg) - Paku - Patok kayu tahun - Cat meni
= = = = = =
195 86 543 0.5 0.01 0.5
M3 M3 Kg Kg M3 Kg
195 86 543 1 0 1
86,000 90,000 59,000 11,000 3,000,000 26,300
16,770,000 7,740,000 32,037,000 5,500 30,000 13,150
16,770,000 7,740,000 32,037,000 5,500 30,000 13,150
Kegiatan Phisik Untuk Kali Bajulmati - Batu Kali - Pasir pasang - Portland cement (50 kg) - Paku - Patok kayu tahun - Cat meni
= = = = = =
195 86 543 0.5 0.01 0.5
M3 M3 Kg Kg M3 Kg
195 86 543 1 0 1
86,000 90,000 59,000 11,000 3,000,000 26,300
16,770,000 7,740,000 32,037,000 5,500 30,000 13,150
16,770,000 7,740,000 32,037,000 5,500 30,000 13,150
Inspeksi dan pemasangan peralatan / instrumen keamanan bendungan (bagi 14 bendungan)
25,411,800
25,411,800
Belanja Biaya Pemeliharaan lainnya (KPPN 032/05.13/REG.10705701 ) Cat pintu air Cat bronz Minyak cat Kuas Vet Lampu jalan TL 20 watt Accu kering Lampu emergency Lampu Mercury Lampu Tl 40 watt Lampu Tl 40 watt (double)
25,411,800
25,411,800
1,375,000 1,375,000 3,080,000 66,000 880,000 3,750,000 6,250,000 1,125,000 3,220,800 1,650,000 2,640,000
1,375,000 1,375,000 3,080,000 66,000 880,000 3,750,000 6,250,000 1,125,000 3,220,800 1,650,000 2,640,000
= = = = = = = = = = =
50 50 280 25 100 75 25 15 60 25 20
Kg Kg Kg Bh Kg Bh Bh Bh Bh Bh Bh
50 50 280 25 100 75 25 15 60 25 20
27,500 27,500 11,000 2,640 8,800 50,000 250,000 75,000 53,680 66,000 132,000
halaman 2 dari 2
LEMBAR KERJA ALOKASI BIAYA KOMPONEN A PENGELOLAAN SUMBERDAYA AIR WILAYAH SUNGAI UNTUK CORE BALAI RINGKASAN PROGRAM KERJA TAHUN ANGGARAN 2009 BALAI PSAWS BONDOYUDO MAYANG Kode Satker / Program / Kegiatan/ Sub Kegiatan/ 1 A.2 A.2.3.
Total Biaya
Kegiatan / Sub Kegiatan / Jenis Belanja / Rincian Belanja
2
Vol.
Harga satuan ( Rp )
4
3
Jumlah satuan
Harga ( Rp )
5
LOAN ( Rp )
APBD PARALLEL ( Rp )
APBD MURNI ( Rp.)
6
7
8
KEMAMPUAN INSTITUSI PENGELOLA SUMBERDAYA AIR WILAYAH SUNGAI PENGELOLAAN DAN PRASARANA SUMBERDAYA AIR WILAYAH SUNGAI
A.2.3.1. Pengelolaan Hidrologi (Subdit OP SDW) A 2.3.1.7 Pengadaan kendaraan lapangn selama APL-I terdiri dari 1 mobil pick-up dan 2 sepeda motor. I
A.2
Belanja Modal Peralatan dan Mesin (KPPN 031/05.13.REG.10705701 ) Pengadaan kendaraan roda 4 Pick Up Pengadaan kendaraan roda 2
= =
1 Bh 2 Bh
1 2
130,000,000 20,000,000
KEMAMPUAN INSTITUSI PENGELOLA SUMBERDAYA AIR WILAYAH SUNGAI
170,000,000
170,000,000
170,000,000
170,000,000
130,000,000 40,000,000
130,000,000 40,000,000
67,700,000
67,700,000
A.2.2
Sistem Informasi Manajemen Pengelolaan SDA Wilayah Sungai dan Irigasi Tingkat Wilayah Sungai
4,400,000
4,400,000
A.2.2.2
Penyediaan jaringan global berbasis perangkat keras dan perangkat lunak (rekomendasi speksifikasi teknis oleh Subdit Data dan Informasi SDA)
4,400,000
4,400,000
Belanja Modal Peralatan dan Mesin (KPPN 031/05.13.REG.10705701 ) Hub Network 16 port UPS
4,400,000
4,400,000
900,000 3,500,000
900,000 3,500,000
Pengelolaan dan Prasarana Sumber daya Air wilayah Sungai
63,300,000
63,300,000
Pelaksanaan dan Peningkatan Alokasi Air Pada Wilayah Sungai
16,500,000
16,500,000
16,500,000
16,500,000
16,500,000
16,500,000
16,500,000
16,500,000
II
A.2.3 A.2.3.2
= =
1 Bh 1 Bh
1 1
900,000 3,500,000
A 2.3.2.4.6 Peningkatan dan rehabilitasi bangunan pengukur debit (rekomendasi Tim Teknis BWRM propinsi). III
A.2.3
Belanja Biaya Pemeliharaan Jaringan (KPPN.031/05.51/Reg.10705701) Rehabiltasi bangunan pengukur debit
=
3 Paket
3
5,500,000
46,800,000
46,800,000
A.2.3.3. Pengelolaan Kualitas Air Pada Wilayah Sungai
46,800,000
46,800,000
A.2.3.3.7 Penyelesaian prasarana dan peralatan laboratorium kualitas air
46,800,000
46,800,000
45,000,000
45,000,000
2,400,000 8,500,000 2,500,000 13,000,000 18,600,000
2,400,000 8,500,000 2,500,000 13,000,000 18,600,000
1,800,000
1,800,000
1,800,000
1,800,000
PEMELIHARAAN PRASARANA SUNGAI
2,274,060,000
2,274,060,000
Rehabilitasi Prasarana Sungai yang diprioritaskan
2,274,060,000
2,274,060,000
III
IV
A.4 A.4.2 A.4.2.1
PENGELOLAAN DAN PRASARANA SUMBERDAYA AIR WILAYAH SUNGAI
Belanja Modal Peralatan dan Mesin (KPPN 031/05.13.REG.10705701 ) Cooler box for sample botles Total suspended acids Sedimen Sampler COD Reactor BOD Incubator
= = = = =
2 1 1 1 1
Belanja Biaya Pemeliharaan Lainnya (KPPN 031/05.13.REG.10705701 ) Pemeliharaan/penggantian peralatan kualitas air
=
1 Unit
Bh Bh Bh Bh Bh
2 1 1 1 1
1,200,000 8,500,000 2,500,000 13,000,000 18,600,000
1
1,800,000
RIM - A Sub Projects
A.4.2.1.4 Pelaksanaan pekerjaan perbaikan prasarana sungai yang dikontrakan dengan mengikut sertakan staf Balai PSDA dalam pelaksanaan pekerjaan (on the job training) Belanja Gedung Peralatan dan Bangunan (KPPN.031/05.51/Reg.10705701) Konstruksi WISMP Perbaikan K. Curahmenjangan Perbaikan K. Curah Menjangan I Perbaikan K. Banger Perbaikan K. Banger I Perbaikan K. Tanggul Perbaikan K. Tanggul I Perbaikan K. Asem I Perbaikan K. Jatiroto Perbaikan K. Jatiroto I
= = = = = = = = =
1 1 1 1 1 1 1 1 1
Paket Paket Paket Paket Paket Paket Paket Paket Paket
1 1 1 1 1 1 1 1 1
205,000,000 210,000,000 217,000,000 215,000,000 213,000,000 120,050,000 119,090,000 375,000,000 200,000,000
2,274,060,000
2,274,060,000
1,874,140,000
1,874,140,000
1,874,140,000
1,874,140,000
205,000,000 210,000,000 217,000,000 215,000,000 213,000,000 120,050,000 119,090,000 375,000,000 200,000,000
205,000,000 210,000,000 217,000,000 215,000,000 213,000,000 120,050,000 119,090,000 375,000,000 200,000,000
halaman 1 dari 2
Kode Satker / Program / Kegiatan/ Sub Kegiatan/ 1
Total Biaya
Kegiatan / Sub Kegiatan / Jenis Belanja / Rincian Belanja
2
Vol.
Harga satuan ( Rp )
4
3
A.4.2.1.5 Melaksanakan pekerjaan perbaikan/rehabilitasi prasana sungai secara swakelola (teknis maupun bio engineering). IV.
Belanja Modal Gedung Perumahan dan Bangunan (KPPN.031/05.51/Reg.10705701)
Jumlah satuan
Harga ( Rp )
5
LOAN ( Rp )
6
399,920,000
399,920,000
399,920,000
399,920,000
APBD PARALLEL ( Rp )
APBD MURNI ( Rp.)
7
8
#REF!
K. Bondoyudo - Batu Kali - Pasir - Porland Cement - Kayu bouplank - Tabalan rumput
= = = = =
174 74 500 0.20 82
M3 M3 Zak M3 M2
174 74 500 0.20 82
90,000 80,000 55,000 2,500,000 5,000
15,660,000 5,920,000 27,500,000 500,000 410,000
15,660,000 5,920,000 27,500,000 500,000 410,000
= = = = =
174 74 500 0.20 82
M3 M3 Zak M3 M2
174 74 500 0.20 82
90,000 80,000 55,000 2,500,000 5,000
15,660,000 5,920,000 27,500,000 500,000 410,000
15,660,000 5,920,000 27,500,000 500,000 410,000
= = = = =
174 74 500 0.20 82
M3 M3 Zak M3 M2
174 74 500 0.20 82
90,000 80,000 55,000 2,500,000 5,000
15,660,000 5,920,000 27,500,000 500,000 410,000
15,660,000 5,920,000 27,500,000 500,000 410,000
= = = = =
174 74 500 0.20 82
M3 M3 Zak M3 M2
174 74 500 0.20 82
90,000 80,000 55,000 2,500,000 5,000
15,660,000 5,920,000 27,500,000 500,000 410,000
15,660,000 5,920,000 27,500,000 500,000 410,000
= = = = =
174 74 500 0.20 82
M3 M3 Zak M3 M2
174 74 500 0.20 82
90,000 80,000 55,000 2,500,000 5,000
15,660,000 5,920,000 27,500,000 500,000 410,000
15,660,000 5,920,000 27,500,000 500,000 410,000
= = = = =
174 74 500 0.20 82
M3 M3 Zak M3 M2
174 74 500 0.20 82
90,000 80,000 55,000 2,500,000 5,000
15,660,000 5,920,000 27,500,000 500,000 410,000
15,660,000 5,920,000 27,500,000 500,000 410,000
= = = = =
174 74 500 0.20 82
M3 M3 Zak M3 M2
174 74 500 0.20 82
90,000 80,000 55,000 2,500,000 5,000
15,660,000 5,920,000 27,500,000 500,000 410,000
15,660,000 5,920,000 27,500,000 500,000 410,000
= = = = =
174 74 500 0.20 82
M3 M3 Zak M3 M2
174 74 500 0.20 82
90,000 80,000 55,000 2,500,000 5,000
15,660,000 5,920,000 27,500,000 500,000 410,000
15,660,000 5,920,000 27,500,000 500,000 410,000
50,000,000
50,000,000
K. Bedadung - Batu Kali - Pasir - Porland Cement - Kayu bouplank - Tabalan rumput K. Jatiroto - Batu Kali - Pasir - Porland Cement - Kayu bouplank - Tabalan rumput K. Tanggul - Batu Kali - Pasir - Porland Cement - Kayu bouplank - Tabalan rumput K. Krai - Batu Kali - Pasir - Porland Cement - Kayu bouplank - Tabalan rumput K. Curah Menjangan - Batu Kali - Pasir - Porland Cement - Kayu bouplank - Tabalan rumput K. Asem - Batu Kali - Pasir - Porland Cement - Kayu bouplank - Tabalan rumput K. Celeng Mati - Batu Kali - Pasir - Porland Cement - Kayu bouplank - Tabalan rumput A.2 A.2.3 A.2.3.4
KEMAMPUAN INSTITUSI PENGELOLA SUMBER DAYA AIR WILAYAH SUNGAI Pengelolaan dan Prasarana Sumber daya Air wilayah Sungai
50,000,000
50,000,000
Pengelolaan Banjir
50,000,000
50,000,000
50,000,000
50,000,000
50,000,000
50,000,000
38,000,000 2,000,000 4,500,000 5,500,000
38,000,000 2,000,000 4,500,000 5,500,000
A 2.3.4.3 Pemasangan dan Pengoperasian sistem peramalan dan peringatan banjir serta mencatat dan memproses data banjir termasuk pengukuran aliran
III
Belanja Modal Peralatan dan Mesin (KPPN.031/05.51/Reg.10705701) Tower Facsimile Hand set radio (movable radio) Rig base station
= = = =
1 1 3 2
Unit Unit Unit Unit
1 1 3 2
38,000,000 2,000,000 1,500,000 2,750,000
halaman 2 dari 2
RENCANA PENGADAAN / PROCUREMENT PLAN 2009 WATER RESOURCES and IRRIGATION MANAGEMENT PROGRAM ( WISMP I ) APL I COMPONEN A, B, C ( DITJEN SDA ) DIPA No. SP NAMA SATKER Estimasi Biaya NO
KODE
UNIT ORGANISASI, NAMA PAKET, JENIS PEKERJAAN/PENGADAAN
1
2
3
1
Rp
US $
Metode Pengadaan
Post / Prior Review
4
5
6
7
Pengumuman Pemasukan Penawaran Pengadaan 8
9
Eval / Nego
Penanda tanganan kontrak
Jangka Waktu Kontrak
Keterangan / Permasalahan
10
11
12
13
DINAS PU PROPINSI JAWA TIMUR
WORKS (Category 1) I
BALAI PSAWS BANGO GEDANGAN ( MALANG )
Penyiapan Ruangan SIM II 1
-
P erbaik an Gedung / R uangan
1
1 Unit
49,693,500
7,058.824
1 Unit
92,500,000
10.882.35
BALAI PSAWS BENGAWAN SOLO , BOJONEGORO
P erbaik an Gedung / R uangan CW1
Penyiapan Ruangan SIM
April 09
NS
Post Review
NS
-
15 Hari
-
NS
-
15 Hari
-
April 09
April 09
Mei 09
GOODS ( Category 2 ) I
DINAS PU PROPINSI JAWA TIMUR 1
P eralatan Kantor Alat Penjilidan Buku Alat Pemotong Kertas
2
1.
1 Unit 1 Unit
12,500,000 9,700,000
1 Unit
15,000,000
Kendaraan Berm otor 1 bh 2 bh
130,000,000 40,000,000
P eralatan Kantor / M eubelair Meja Kerja Kursi Kerja Meja Komputer Filling Kabinet Lemari Rak AC
3.
3,370,000 9,500,000
BALAI PSAWS BANGO GEDANGAN ( MALANG )
Pengadaan kendaraan roda 4 Pick Up Pengadaan kendaraan roda 2 2.
1 Bh 1 Unit
P eralatan Audio - Handycam
II
2,090,000 1,650,000
P eralatan Kom puter - Notebook - Printer Laser
4
16,000,000 1 Bh 2 Bh
#REF!
P eralatan Kom puter UPS Notebook
3
#REF!
4 4 3 3 1 2
bh bh bh bh bh bh
2,000,000 600,000 1,938,000 4,312,500 5,854,000 7,952,000
P eralatan Kom puter Server Switch hub D link 8 port Cable + Soket LAN Card Stavolt 500 VA
PROCUREMENT WISMP I - TA. 2007 DINAS PU PENGAIRAN PROPINSI JAWA TIMUR
1 5 465 5 3
Bh Bh meter Unit Unit
12,500,000 1,380,000 2,092,500 2,785,000 967,500
Halaman 1 dari 10 Lembar
Estimasi Biaya NO
KODE
1
2
UNIT ORGANISASI, NAMA PAKET, JENIS PEKERJAAN/PENGADAAN 3
Pengadaan Handy Talky III Gd.1
Kendaraan Berm otor
Gd.2
Gd.3
Gd.4
20 bh 1 bh 1 bh
P eralatan Kantor / M eubelair Kursi Lipat Filling Kabinet Komputer PC Handy cam LCD Monitor Scanner Printer Laser Speaker Active Simbadda Alat Penghancur Kertas
4.
2 bh
P eralatan Hidrologi Pengadaan Peralatan Penakar Hujan Penakar Hujan Manual Sunshine recorder Clock ARR
3.
3 Set
BALAI PSAWS PUNCU SELODONO ( KEDIRI )
Pengadaan kendaraan roda 2 2.
US $
Metode Pengadaan
Post / Prior Review
Penanda tanganan kontrak
Jangka Waktu Kontrak
Keterangan / Permasalahan
4
5
6
7
8
9
10
11
12
13
Alat Kom unik asi
4.
1.
Eval / Nego
Pengumuman Pemasukan Penawaran Pengadaan
Rp
#REF!
#REF!
40,000,000 40,000,000
4,706 4706.
NS
Pos Review
Maret 2009
Maret 2009
Maret 2009
April 2009
1 bln
51,250,000
6,029
NS
Pos Review
Maret 2009
Maret 2009
Maret 2009
April 2009
1 bln
18,000,000 26,500,000 6,750,000
2118. 3118. 794. 4,952 59. 165. 882. 494. 253. 1529. 1141. 44. 386.
Pos Review
April 2009
April 2009
April 2009
April 2009
1 bln
Bh Bh Bh Bh Bh Bh Bh Bh Bh
42,096,000 500,000 1,400,000 7,500,000 4,200,000 2,150,000 13,000,000 9,696,000 370,000 3,280,000
NS
5 1 1 1 1 1 2 1 1
515 60. 243. 212. 176.
Pos Review
April 2009
April 2009
April 2009
April 2009
7 hari
Bh Bh Bh Bh
5,877,000 510,000 2,067,000 1,800,000 1,500,000
NS
1 3 3 1
5,854,000 2,040,000 3,074,000 740,000
689 240. 362. 87.
NS
Pos Review
Maret 2009
Maret 2009
Maret 2009
April 2009
1 bln
#REF!
#REF!
40,000,000
4,705.882
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
30 hari
9,900,000
1,164.706
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
30 hari
P eralatan Kom puter Swicth Hub 16 pin Wireless-G PCI Card with speed Booster Bluetootch USB Adapter Alat komunikasi Rig
6,750,000
5. Gd.6
Bahan Bangunan
6
Batu Kali PC Pasir
IV
BALAI PSAWS BUNTUNG PAKETINGAN ( SURABAYA )
1.
Gd1
Kendaraan Berm otor Pengadaan kendaraan roda 2
2.
Gd2
Gd3
Gd4
7 bh 5 bh 10 bh
P eralatan Kom puter Laptop Mouse Optical PC Komputer Printer laser jet Stavolt UPS Scaner LAN
4.
2 bh
P eralatan Hidrologi Pengadaan Peralatan Penakar Hujan Alat Penakar Hujan Tiang untuk alat penakar hujan Gelas ukur
3.
90 M3 252 Zak 39.5 M3
49,518,000 9,500,000 950,000 7,500,000 4,848,000 350,000 3,370,000 13,000,000 10,000,000
5,825.647
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
60 hari
Bh Bh Bh Bh Bh Bh Bh Unit
21,800,000 10,800,000 1,000,000 10,000,000
2,564.706
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
60 hari
18 Set 2 Bh 4 Bh
1 5 1 1 1 1 1 1
Alat Kom unik asi Pengadaan Handy Talky Antena Rig
PROCUREMENT WISMP I - TA. 2007 DINAS PU PENGAIRAN PROPINSI JAWA TIMUR
6,300,000 2,350,000 1,250,000
Halaman 2 dari 10 Lembar
Estimasi Biaya NO
KODE
UNIT ORGANISASI, NAMA PAKET, JENIS PEKERJAAN/PENGADAAN
1
2
3
5.
Gd5
2
3
4
9
10
11
12
13
Apr-09
Apr-09
Apr-09
May-09
60 hari
4
5
6
7
8
NS
Post Review
14,850,000
1,747.059
#REF!
#REF!
Kendaraan Berm otor 2 Bh
40,000,000
4,705.882
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
30 hari
Gd2
Peralatan Kantor / Meubelair Meja Komputer Filling Kabinet Lemari Rak Printer Laser
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
30 hari
bh bh bh bh
24,788,000 1,292,000 2,800,000 11,000,000 9,696,000
2,916.235
2 2 2 2
Peralatan Komputer Stavolt 500 VA Wireless-G PCI Card with speed Booster Bluetootch USB Adapter UPS
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
30 hari
Unit Unit Unit bh
8,514,000 1,400,000 689,000 3,055,000 3,370,000
1,001.647
4 1 5 1
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
30 hari
5 Set 2 Set 1 Set
6,500,000 3,000,000 1,000,000 2,500,000
764.706
Pengadaan Handy Talky Antena Rig Gd5
Gelas Penakar Hujan, Gelas Syphon, Gembok Pengaman Penakar Hujan, Service Jam ARR, Pagar Pengaman Penakar Hujan
1 Pkt
46,055,000
5,418.235
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
30 hari
Gd6
Pemasangan dan Pengoperasian Sistem Peringatan Dini Banjir
1 Pkt
58,000,000
6,823.529
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
30 hari
#REF!
#REF!
1 Bh 2 Bh
130,000,000 40,000,000
15,294.118 4,705.882
NS NS
Post Review Post Review
Apr-09 Apr-09
Apr-09 Apr-09
Apr-09 Apr-09
May-09 May-09
Jun-09 Jun-09
4,390,000 1,020,000 3,370,000
516.471
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Jun-09
1 Bh 1 Bh
45,000,000 2,400,000 8,500,000 2,500,000 13,000,000 18,600,000
5,294.118
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Jun-09
2 1 1 1 1
1,800,000
211.765
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Jun-09
#REF!
#REF!
47,000,000 20,000,000 15,000,000 12,000,000
5,529.41 2,352.941 1,764.706 1,411.765
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Jun-09
130,000,000
15,294.118
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Jun-09
4,705.882
NS
Apr-09
Apr-09
May-09
Jun-09
Gd3
Gd4
Alat Kom unik asi
BALAI PSAWS BONDOYUDO MAJANG ( LUMAJANG )
Kendaraan Berm otor Gd1 Gd2 Gd3
Pengadaan kendaraan roda 4 Pick Up Pengadaan kendaraan roda 2
P eralatan Kom puter Hub Network 8 port UPS
Gd4
P eralatan Hidrologi Cooler box for sample botles Total suspended acids Sedimen Sampler COD Reactor BOD Incubator
Bh Bh Bh Bh Bh
P eralatan Laboratorium
4
Pemeliharaan/penggantian peralatan Lab kualitas air VII 1
Keterangan / Permasalahan
Post / Prior Review
Pengadaan kendaraan roda 2
1
3
Jangka Waktu Kontrak
Metode Pengadaan
Gd1
VI
2
1 Bh
BALAI PSAWS GEMBONG PEKALEN ( PASURUAN )
1
Penanda tanganan kontrak
US $
Bahan Bangunan Bahan swakelola untuk perbaikan bangunan pengukur debit
V
Eval / Nego
Pengumuman Pemasukan Penawaran Pengadaan
Rp
1 Unit
BALAI PSAWS SAMPEAN BARU BONDOWOSO I Gd1
Kegiatan yang dibiayai LOAN
P eralatan Kantor / M eubelair Kursi kerja dan Meja Kerja Kursi Rapat Meja Rapat
Gd2 Gd3
Mobil Pick Up Sepeda Motor
PROCUREMENT WISMP I - TA. 2007 DINAS PU PENGAIRAN PROPINSI JAWA TIMUR
10 unit 60 unit 10 unit 1 Bh 2 Bh
40,000,000
Post Review
Apr-09
Halaman 3 dari 10 Lembar
Estimasi Biaya NO 1
KODE
UNIT ORGANISASI, NAMA PAKET, JENIS PEKERJAAN/PENGADAAN
2
3
Gd4
Radio HT, Antena, Rig
Gd5
Server
Rp
US $
4
5
Metode Pengadaan 6
Gd2
Pengadaan kendaraan roda 2
Gd3
Gd4
IX
8
9
12
Apr-09
Apr-09
11
Apr-09
May-09
Jun-09
1 Bh
13,700,000
1,611.765
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Jun-09
#REF!
#REF!
2 Bh
40,000,000
4,705.882
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Jun-09
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Jun-09
bh bh bh bh bh
13,196,000 1,000,000 300,000 3,250,000 646,000 8,000,000
1,552.471
2 2 1 1 2
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Jun-09
bh bh bh bh bh
32,511,000 7,500,000 9,500,000 13,000,000 1,771,000 740,000
3,824.824
1 1 1 1 2
18,000,000 12,000,000 1,500,000 4,500,000
2,117.647
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Jun-09
#REF!
#REF!
40,000,000
4,705.882
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
15,947,000
1,876.118
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
2,000.000
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
Kendaraan Berm otor Gd1
4
20 Set 3 Bh 3 Bh
BALAI PSAWS BENGAWAN SOLO , BOJONEGORO
1
3
13
7
Post Review
Alat Kom unik asi Pengadaan Handy Talky Antena Rig
2
Keterangan / Permasalahan
NS
P eralatan Kom puter Komputer PC Lap Top Scanner Printer Laser (HP Laser Jet, 1020) Speaker Active Simbadda
4
Jangka Waktu Kontrak
1,341.176
P eralatan Kantor / M eubelair Meja Kerja Kursi Kerja Almari Besi Meja Komputer AC
3
10
Penanda tanganan kontrak
Kendaraan Berm otor Gd1
2
Eval / Nego
11,400,000
BALAI PSAWS MADIUN, MADIUN
1
Pengumuman Pemasukan Penawaran Pengadaan
1 Unit
P eralatan Kom puter
VIII
Post / Prior Review
Gd2
Gd3
Gd3
Pengadaan kendaraan roda 2
2 Bh
P eralatan Kantor / M eubelair
1,500,000
Meja Kerja
3 bh
Kursi Kerja
3 bh
450,000
Meja Komputer
2 bh
1,292,000
Filling Kabinet
2 bh
2,875,000
Lemari Rak
1 bh
5,854,000
AC
1 bh
3,976,000 17,000,000
P eralatan Kom puter Komputer PC
1 bh
7,500,000
Lap Top
1 bh
9,500,000
Alat Kom unik asi
5 Bh
3,000,000
352.941
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
13 Unit
7,241,000
851.882
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
1 Unit
10,000,000
1,176.471
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
Radio HT Gd4
Jaringan LAN
Gd5
Bahan swakelola untuk perbaikan bangunan pengukur debit
6
X
Bahan Bangunan
BALAI PSAWS MADURA ( PAMEKASAN )
PROCUREMENT WISMP I - TA. 2007 DINAS PU PENGAIRAN PROPINSI JAWA TIMUR
Halaman 4 dari 10 Lembar
Estimasi Biaya NO
KODE
UNIT ORGANISASI, NAMA PAKET, JENIS PEKERJAAN/PENGADAAN
1
2
3
1
Eval / Nego
Penanda tanganan kontrak
Jangka Waktu Kontrak
Keterangan / Permasalahan
9
10
11
12
13
Mei 2009 Mei 2009 April 2009 April 2009 April 2009 April 2009 April 2009 April 2009
Mei 2009 Mei 2009 April 2009 April 2009 April 2009 April 2009 April 2009 April 2009
Mei 2009 Mei 2009 April 2009 April 2009 April 2009 April 2009 April 2009 April 2009
Juni 2009 Juni 2009 Mei 2009 Mei 2009 Mei 2009 Mei 2009 Mei 2009 Mei 2009
3 bln 3 bln 2 bln 2 bln 2 bln 2 bln 2 bln 2 bln
May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09
May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09
May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09 May-09
Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09
Pengumuman Pemasukan Penawaran Pengadaan
Rp
US $
Metode Pengadaan
Post / Prior Review
4
5
6
7
8
Kendaraan Berm otor Pengadaan kendaraan roda 4 Pick Up Pengadaan kendaraan roda 2
1 Bh 2 Bh
130,000,000 40,000,000
1 Unit 1 Unit
45,000,000 75,000,000
1 Keg
6,000,000
P eralatan Hidrologi
2
AWLR (mesin) AWLR (Konstruksi) 3
P eralatan Jaringan Pengadaan Jaringan LAN
P eralatan Hidrologi
4
Spectometer Desikator Labu ukur 1000 ml Gelas ukur 1000 ml Pipet mesuring Glass Pyrex 10 ml Botol timbang Pyrex Botol BOD Bak pencuci peralatan
1 1 15 15 1 2 15 1
Bh Bh Bh Bh Bh Bh Bh Bh
20,000,000 3,500,000 12,750,000 3,750,000 75,000 250,000 7,500,000 2,000,000
1 1 1 1 1 1 1 1 1 1 1 1 1
pkt pkt pkt pkt pkt pkt pkt pkt pkt pkt pkt pkt pkt
140,000,000 100,000,000 100,000,000 100,000,000 100,000,000 100,000,000 100,000,000 100,000,000 100,000,000 100,000,000 100,000,000 100,000,000 100,000,000 -
Paket Paket Paket Paket Paket Paket Paket Paket
250,000,000 230,000,000 100,000,000 100,000,000 100,000,000 100,000,000 100,000,000 100,000,000
29412. 27059. 11765. 11765. 11765. 11765. 11765. 11765.
NCB NCB SW SW SW SW SW SW
Prior Review Prior Review Pos Review Pos Review Pos Review Pos Review Pos Review Pos Review
90,900,000 90,900,000 86,360,000 86,360,000 86,360,000 86,360,000 86,360,000 86,360,000 86,360,000
10,694.118 10,694.118 10,160.000 10,160.000 10,160.000 10,160.000 10,160.000 10,160.000 10,160.000
SW SW SW SW SW SW SW SW SW
Post Post Post Post Post Post Post Post Post
RIM A ( CATEGORY 5 ) I
BALAI PSAWS BANGO GEDANGAN ( MALANG ) Pemel. K. Bajal Picisan Kab. Tulungagung Pemel. K. Karang Tuwo, Kab. Tulungagung Pemel. K. Karang Tuwo, Kab. Tulungagung Pemel. Kali Klantur Kab. Tulungagung Pemel. Kali Klantur Kab. Tulungagung Pemel. Kali Ngasinan kanan, Kab. Tulungagung Pemel. Kali Bodo Kab. Malang Pemel. Kali Bodo Kab. Malang Pemel. Kali Amprong Kab. Malang Pemel. Kali Amprong Kab. Malang Pemel. Kali Kajar Kab. Malang Pemel. Kali Kajar Kab. Malang Pemel. Kali Mewek , Kab. Malang
2 CW.1 CW.2 CW.3 CW.4 CW.5 CW.6 CW.7 CW.8 3
BALAI PSAWS PUNCU SELODONO ( KEDIRI ) Perbaikan Kali Bangi, Kab. Kediri Perbaikan Kali Kresek, Kab. Kediri Perbaikan Kali Tawang, Kab. Kediri Perbaikan Kali Tawang, Kota Kediri Perbaikan Kali Termas Lama, Kab. Kediri Perbaikan Kali Bruno, Kota Kediri Perbaikan Kali Kedak, Kota Kediri Perbaikan Kali Kedungsoko, Kab. Nganjuk
1 1 1 1 1 1 1 1
BALAI PSAWS BUNTUNG PAKETINGAN ( SURABAYA ) Pengaman Tangkis K. Kintelan Ds Balong Mojo Kec Puri Kab. Mjk Perb. K. Swideng Desa Swideng Kec Trowulan Kab. Mojokerto Perb. Afvour tinggar Ds Tinggar Kec Bangsal Kab. Mojokerto Perb. Afvour tinggar Ds Jumeneng Kec Mojoanyar Kab. Mjkto Perb. Afvour Anak sungai tekuk Ds Jumeneng Kec Mojoanyar Kab. Mjkto Pengaman tangkis Kali Gembolo Ds Jabon tegal Mojo Kec Pungging Kab. Mjk Perbaikan Kali Cemporat Desa Japan Kec Sooko Kab. Mojokerto Pengaman tanggul Kali Kambing Ds Corat Kec Gempol Kab. Pasuruan Perbaikan Kali Sumber Glogok Ds Modopuro Kec Bangsal Kab. Mojokerto
PROCUREMENT WISMP I - TA. 2007 DINAS PU PENGAIRAN PROPINSI JAWA TIMUR
1 1 1 1 1 1 1 1 1
pkt pkt pkt pkt pkt pkt pkt pkt pkt
Review Review Review Review Review Review Review Review Review
60 60 60 60 60 60 60 60 60
Hari Hari Hari Hari Hari Hari Hari Hari Hari
Halaman 5 dari 10 Lembar
Estimasi Biaya NO
KODE
1
2
UNIT ORGANISASI, NAMA PAKET, JENIS PEKERJAAN/PENGADAAN 3
Perbaikan Kali Tekuk Desa Salen Kec Bangsal Kab. Mojokerto Perbaikan Kali Tekuk Desa Tinggar Kec Bangsal Kab. Mojokerto Perbaikan Kali Sumber Kembar Ds Kebon dalem Kec Mojosari Kab. Mojokerto Perbaikan Kali Marmoyo, Ds. Smbr Nongko, Kec Ngusikan, Kab. Jombang 4
4
1 1 1 1
pkt pkt pkt pkt
US $ 5
Metode Pengadaan
Post / Prior Review
6
7
Pengumuman Pemasukan Penawaran Pengadaan
Eval / Nego
Penanda tanganan kontrak
Jangka Waktu Kontrak
Keterangan / Permasalahan
12
13
8
9
10
11
86,360,000 86,360,000 86,360,000 72,720,000
10,160.000 10,160.000 10,160.000 8,555.294
SW SW SW SW
Post Post Post Post
Review Review Review Review
May-09 May-09 May-09 May-09
May-09 May-09 May-09 May-09
May-09 May-09 May-09 May-09
Jun-09 Jun-09 Jun-09 Jun-09
60 60 60 60
Hari Hari Hari Hari
Hari Hari Hari Hari Hari Hari
BALAI PSAWS GEMBONG PEKALEN ( PASURUAN ) CW1 CW2 CW3 CW4 CW5 CW6
Perkuatan Tebing Kali Welang Ds. Kebotohan, Kec. Kraton, Kab. Pasuruan Perkuatan Tebing Kali Welang Ds. Mulyorejo, Kec. Kraton, Kab. Pasuruan Perkuatan tebing kanan K. Kedung Larangan Ds. Manarui, Kec. Bangil, Kab. Pasuruan Perkuatan tebing kiri K. Petung Ds. Sekarputih, Kec. Gondangwetan, Kab. Pasuruan Perkuatan tebing K. Gembong Ds. Purutrejo, Kec. Purworejo, Kab. Pasuruan Perkuatan tebing K. Gembong Ds. Kandang sapi, Kec. Purworejo, Kab. Pasuruan
CW1 CW2 CW3 CW4 CW5
Perbaikan K. Asem Perbaikan K. Jatiroto Perbaikan K. Banger Perbaikan K. Banger I Perbaikan K. Tanggul
CW1
BALAI PSAWS SAMPEAN BARU BONDOWOSO Perbaikan Tangkis K. Deluwang Desa Gunung Malang, Kec. Suboh, Kab. Situbondo
5
1 1 1 1 1 1
Paket Paket Paket Paket Paket Paket
226,000,000 208,000,000 198,000,000 198,000,000 210,000,000 210,000,000
26,588.235 24,470.588 23,294.118 23,294.118 24,705.882 24,705.882
NCB SW SW SW SW SW
Prior Review Post Review Post Review Post Review Post Review Post Review
May-09 May-09 May-09 May-09 May-09 May-09
May-09 May-09 May-09 May-09 May-09 May-09
May-09 May-09 May-09 May-09 May-09 May-09
Jun-09 Jun-09 Jun-09 Jun-09 Jun-09 Jun-09
90 90 90 90 90 90
1 1 1 1 1
Paket Paket Paket Paket Paket
155,000,000 160,000,000 217,000,000 215,000,000 128,000,000
18,235.294 18,823.529 25,529.412 25,294.118 15,058.824
SW SW SW SW SW
Post Post Post Post Post
Review Review Review Review Review
Apr-09 Apr-09 Apr-09 Apr-09 Apr-09
Apr-09 Apr-09 Apr-09 Apr-09 Apr-09
Apr-09 Apr-09 Apr-09 Apr-09 Apr-09
May-09 May-09 May-09 May-09 May-09
Aug-09 Aug-09 Aug-09 Aug-09 Aug-09
1 pkt
200,000,000
23,529.412
SW
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
BALAI PSAWS BONDOYUDO MAJANG ( LUMAJANG )
6
CW2
Perbaikan Tangkis K. Bajulmati (Situbondo) Desa Wonorejo, Kec. Banyuputih,Kab Situbondo Kab. Situbondo
1 pkt
200,000,000
23,529.412
SW
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
CW3
Perbaikan Tangkis K. Deluwang Desa Ketah, Kec. Suboh, Kab. Bondowoso
1 pkt
200,000,000
23,529.412
SW
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
CW4
Perbaikan Tangkis K. Suger Desa Maesan, Kec. Maesan, Kab. Bondowoso
1 pkt
150,000,000
17,647.059
SW
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
CW5
Perbaikan Tangkis K. Clangap Desa Alas Sumur, Kec. Pujer, Kab. Bondowoso
1 pkt
150,000,000
17,647.059
SW
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
CW6
Perbaikan Tangkis K. Bajulmati Desa Bimorejo, Kec. Wongsorejo, Kab. Banyuwangi
1 pkt
200,000,000
23,529.412
SW
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
CW7
Perbaikan Tangkis K. Bomo Desa Parijatah,Kaligung, Kec. Rogojampi, Kab. Banyuwangi
1 pkt
200,000,000
23,529.412
SW
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
Paket Paket Paket Paket Paket
1,230,000,000 250,000,000 250,000,000 250,000,000 280,000,000 200,000,000
29,411.765 29,411.765 29,411.765 32,941.176 23,529.412
NCB NCB NCB NCB SW
Prior Review Prior Review Prior Review Prior Review Post Review
Apr-09 Apr-09 Apr-09 Apr-09 Apr-09
Apr-09 Apr-09 Apr-09 Apr-09 Apr-09
Apr-09 Apr-09 Apr-09 Apr-09 Apr-09
May-09 May-09 May-09 May-09 May-09
Aug-09 Aug-09 Aug-09 Aug-09 Aug-09
1 Paket
400,000,000
1 Paket
220,000,000
1 Paket
205,000,000
1 Paket
150,000,000
1 Paket
200,000,000
1 Paket
220,000,000
7
BALAI PSAWS MADIUN - MADIUN CW1 CW2 CW3 CW4 CW5
8
Rp
Perbaikan Kali Mayong Kab.Ponorogo Perbaikan Kali Gandong Kab. Magetan + Kab.Madiun Perbaikan Kali slahung Kab.Ponorogo Perbaikan Kali Catur Kab. Madiun Perbaikan Kali Purwosari Kab. Madiun
1 1 1 1 1
BALAI PSAWS BENGAWAN SOLO , BOJONEGORO Perbaikan Checkdam Kali Mekuris Desa Pesen Kec. Kanor Kab. Bojonegoro Perbaikan Tebing Kanan Kali Mekuris Desa Kedungrejo Kec. Sumberejo Kab. Bojonegoro Perbaikan Tebing Kiri Kali Kening Desa Kluncing Kec. Parengan Kab. Tuban Pengerukan Kali Kedungbajul Desa Campurejo Kec. Bojonegoro Kab. Bojonegoro Perbaikan Tebing Kanan Kali Pacal Desa Senganten Kec. Gondang Kab. Bojonegoro Perbaikan Tebing Kiri Kali Pacal Desa Klepek Kec. Sukosewu Kab. Bojonegoro
PROCUREMENT WISMP I - TA. 2007 DINAS PU PENGAIRAN PROPINSI JAWA TIMUR
Halaman 6 dari 10 Lembar
Estimasi Biaya NO
KODE
1
2
UNIT ORGANISASI, NAMA PAKET, JENIS PEKERJAAN/PENGADAAN 3
Perbaikan Tebing Kiri Kali Kening Desa Suciharjo Kec. Parengan Kab. Tuban
1 Paket
Eval / Nego
Penanda tanganan kontrak
Jangka Waktu Kontrak
Keterangan / Permasalahan
9
10
11
12
13
Pengumuman Pemasukan Penawaran Pengadaan
Rp
US $
Metode Pengadaan
Post / Prior Review
4
5
6
7
8
105,000,000
RIM B ( CATEGORY 6 ) I
BALAI PSAWS BANGO GEDANGAN ( MALANG )
II
CW.2
CW.3
IV
214 579 92.8 4
Normalisasi Pembuang Sobrah Kab. Trenggalek Gebalan Rumput Bongkotan bambu Patok Kayu
346 M2 32 bh 0.2 M3
Normalisasi K. Jati Kab Trenggalek Gebalan Rumput Bongkotan bambu Patok Kayu
244 M2 20 bh 0.2 M3
25,620,000 33,582,000 8,584,000 80,000 4,325,000 608,000 500,000 3,043,750 380,000 500,000
Pemeliharaan Kali Bendokrosok - Batu Kali - Pasir - Porland Cement
80,511,200 26,730,000 9,240,000 44,541,200
9,472 3145. 1087. 5240.
SW
Pos Review
Maret 2009
Maret 2009
Maret 2009
April 2009
2 bln
270 M3 120 M3 764 Zak
Pemeliharaan Kali Bakung - Batu Kali - Pasir - Porland Cement
73,535,000 24,255,000 8,470,000 40,810,000
8,651 2854. 996. 4801.
SW
Pos Review
Maret 2009
Maret 2009
Maret 2009
April 2009
2 bln
245 M3 110 M3 700 Zak
Pemeliharaan Kali Kolokoso - Batu Kali - Pasir - Porland Cement
76,010,000 26,730,000 8,470,000 40,810,000
8,942 3145. 996. 4801.
SW
Pos Review
Maret 2009
Maret 2009
Maret 2009
April 2009
2 bln
270 M3 110 M3 700 Zak
M3 Zak M3 Ljr
BALAI PSAWS PUNCU SELODONO ( KEDIRI ) CW.1
III
Pemeliharaan Kali Putih Kab. Blitar Batu Kali PC Pasir Pipa PVC 2 "
BALAI PSAWS BUNTUNG PAKETINGAN ( SURABAYA ) Kali Bangsal Desa Ngarjo Kec. Mojoanyar Kab. Mojokerto (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
1
Keg
69,699,855
8,199.983
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
30 Hari
Kali Sadar Desa Kwatu Kec. Mojoanyar Kab. Mojokerto (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
1
Keg
62,227,880
7,320.927
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
30 Hari
Kali Kintelan Desa Banjaragung Kec. Puri Kab. Mojokerto (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
1
Keg
68,297,975
8,035.056
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
30 Hari
Kali Gembolo Desa Guwo Kec. Pungging Kab. Mojokerto (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
1
Keg
70,266,530
8,266.651
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
30 Hari
BALAI PSAWS GEMBONG PEKALEN ( PASURUAN )
PROCUREMENT WISMP I - TA. 2007 DINAS PU PENGAIRAN PROPINSI JAWA TIMUR
Halaman 7 dari 10 Lembar
Estimasi Biaya NO
KODE
UNIT ORGANISASI, NAMA PAKET, JENIS PEKERJAAN/PENGADAAN
1
2
3
Eval / Nego
Penanda tanganan kontrak
Jangka Waktu Kontrak
Keterangan / Permasalahan
9
10
11
12
13
Pengumuman Pemasukan Penawaran Pengadaan
Rp
US $
Metode Pengadaan
Post / Prior Review
4
5
6
7
8
CW1
Pemeliharaan/Perkuatan Tebing K. Kedung Larangan (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
1 keg
45,577,620
5,362.073
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
30 Hari
CW2
Pembuatan Parapet K. Petung (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
1 keg
50,037,680
5,886.786
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
30 Hari
CW3
Perbaikan/Perkuatan Tebing K. Cerame (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
1 keg
48,248,860
5,676.336
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
30 Hari
CW4
Perbaikan/Perkuatan Tebing K. Welang (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
1 keg
50,991,600
5,999.012
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
30 Hari
1 keg
49,630,000
5,838.824
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
1 keg
49,630,000
5,838.824
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
1 keg
49,630,000
5,838.824
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
1 keg
49,630,000
5,838.824
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
1 keg
49,630,000
5,838.824
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
3 Lok
16,500,000
1,941.176
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
272,000,000
32,000.000
V CW1
BALAI PSAWS BONDOYUDO MAJANG ( LUMAJANG ) K. Bondoyudo (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
CW2
K. Bedadung (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
CW3
K. Jatiroto (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
CW4
K. Tanggul (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
CW5
K. Krai (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
CW6 VI
VII
Rehabiltasi bangunan pengukur debit BALAI PSAWS SAMPEAN BARU - BONDOWOSO
CW1
Perbaikan Tangkis Kali Bluncong (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
1 keg
73,429,000
8,638.706
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
CW2
Perbaikan Tangkis K. Tlogo (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
1 keg
56,595,650
6,658.312
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
CW3
Kegiatan Phisik Untuk Kali Bajulmati (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
1 keg
56,595,650
6,658.312
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
CW4
Rehabiltasi bangunan pengukur debit
2 Bh
10,000,000
1,176.471
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
57,846,000
6,805.412
BALAI PSAWS MADIUN - MADIUN
PROCUREMENT WISMP I - TA. 2007 DINAS PU PENGAIRAN PROPINSI JAWA TIMUR
Halaman 8 dari 10 Lembar
Estimasi Biaya NO
KODE
UNIT ORGANISASI, NAMA PAKET, JENIS PEKERJAAN/PENGADAAN
1
2
3
Eval / Nego
Penanda tanganan kontrak
Jangka Waktu Kontrak
Keterangan / Permasalahan
9
10
11
12
13
Pengumuman Pemasukan Penawaran Pengadaan
Rp
US $
Metode Pengadaan
Post / Prior Review
4
5
6
7
8
Bahan Bangunan
1
CW1
Perbaikan K. Piring Kab. Madiun (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
1 keg
99,998,000
11,764.471
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
CW2
Perbaikan K. Piring Kota Madiun (Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni)
1 keg
99,998,000
11,764.471
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
NS
Post Review
Apr-09
Apr-09
Apr-09
May-09
Aug-09
CW3
-
R ehabilitasi Bangunan P enguk ur Debit
57,846,000
6,805.412
280,150,000
32,958.824
280,150,000 92,250,000
32,958.824 10,852.941
NS
-
90 Hari
-
96,400,000
11,341.176
NS
-
90 Hari
-
91,500,000
10,764.706
NS
-
90 Hari
-
1,677,600,000
197,364.706
1,677,600,000
197,364.706
(Bahan, PC, Batu Kali, Pasir Pasang, Paku, Patok Kayu, Cat meni) III
BALAI PSAWS BENGAWAN SOLO - BOJONEGORO
1
Belanja biaya Pemeliharaan Lainnya 1. Perb.Tanggul Kn K. Mekuris , Ds. Pesen, Kec Kanor Kab. Bojonegoro 2. Perb. Tebing K. Kening, Ds. Suciharjo, Kec. Parengan Kab. Tuban. 2. Perb. Tebing K. Kening, Ds. Cengkong, Kec. Parengan Kab. Tuban.
Sub Proyek A 1. ( Category 7 ) I
DINAS PU PROPINSI JAWA TIMUR
Konstruk si
1
II
Rehabilitasi Jaringan Irigasi Sbr.Gayam Kab.T.Agung,T.Galek
233,000,000
27,411.765
NS
-
90 Hari
-
Rehabilitasi Jaringan Irigasi Jatimlerek Kab. Jombang Rehabilitasi Jaringan Irigasi Penewon Kab. & Kota Mojokerto
209,700,000
24,670.588
NS
-
90 Hari
-
139,800,000
16,447.059
NS
-
90 Hari
-
Rehabilitasi Jaringan Irigasi Sewu Kab. Madiun Rehabilitasi Jaringan Irigasi Cawak Kab. Bojonegoro
186,400,000 233,000,000
21,929.412 27,411.765
NS NS
-
90 Hari 90 Hari
-
Rehabilitasi Jaringan Irigasi Curah Menjangan, Kab.Lumajang
209,700,000
24,670.588
NS
-
90 Hari
-
Rehabilitasi Jaringan Irigasi Jaruk Taman, Kab. Probolinggo
233,000,000
27,411.765
NS
-
90 Hari
-
Rehabilitasi Jaringan Irigasi Tunjung , Kab.Bangkalan
233,000,000
27,411.765
NS
-
90 Hari
-
Kegiatan Yang Dibiayai GOI (Paralel Financing/APBD)
( Category 5 ) VI. BALAI PSAWS SAMPEAN BARU - BONDOWOSO 1
CW1
Perbaikan Tangkis K. Bluncong Desa Pandak, Kec. Klabang, Kab. Bondowoso
1 pkt
95,000,000
11,176.471
PML
-
Apr-09
Apr-09
Apr-09
May-09
Aug-09
2
CW2
Perbaikan Tangkis K. Tlogo Desa Bercak, Kec. Cerme, Kab. Bondowoso
1 pkt
94,000,000
11,058.824
PML
-
Apr-09
Apr-09
Apr-09
May-09
Aug-09
3
CW3
Perbaikan Tangkis K. Deluwang Desa Dawuhan, Kec. Suboh, Kab. Situbondo
1 pkt
95,000,000
11,176.471
PML
-
Apr-09
Apr-09
Apr-09
May-09
Aug-09
4
CW4
Perbaikan Tangkis K. Deluwang Desa Dawuhan, Kec. Suboh, Kab. Situbondo
1 pkt
95,000,000
11,176.471
PML
-
Apr-09
Apr-09
Apr-09
May-09
Aug-09
1 pkt
90,000,000
10,588.235
PML
-
Apr-09
Apr-09
Apr-09
May-09
Aug-09
IX 1
BALAI PSAWS BENGAWAN SOLO , BOJONEGORO CW1
Pengamanan Pos Duga Air (AWLR) Desa Kedung Jambangan Kec. Bangilan, Kab. Tuban
PROCUREMENT WISMP I - TA. 2007 DINAS PU PENGAIRAN PROPINSI JAWA TIMUR
Halaman 9 dari 10 Lembar
Estimasi Biaya
Eval / Nego
Penanda tanganan kontrak
Jangka Waktu Kontrak
Keterangan / Permasalahan
9
10
11
12
13
Apr-09
Apr-09
Apr-09
May-09
Aug-09
-
May-09
May-09
May-09
Jun-09
Aug-09
L
-
May-09
May-09
May-09
Jun-09
Aug-09
11,764.706
PML
-
May-09
May-09
May-09
Jun-09
Aug-09
95,000,000
11,176.471
PML
-
May-09
May-09
May-09
Jun-09
60 hari
1 pkt
80,000,000
9,411.765
PML
-
May-09
May-09
May-09
Jun-09
60 hari
1 1 1 1 1
95,000,000 95,000,000 95,000,000 95,000,000 80,000,000
Feb-09 Feb-09 Feb-09 Feb-09 Feb-09
Feb-09 Feb-09 Feb-09 Feb-09 Feb-09
Mar-09 Mar-09 Mar-09 Mar-09 Mar-09
Mar-09 Mar-09 Mar-09 Mar-09 Mar-09
60 Hari 60 Hari 60 Hari 60 Hari 60 Hari
US $
Metode Pengadaan
Post / Prior Review
4
5
6
7
8
823.529
PL
-
150,000,000
17,647.059
L
1 pkt
150,000,000
17,647.059
Perbaikan K. Galok Kab. Ponorogo
1 pkt
100,000,000
BALAI PSAWS GEMBONG PEKALEN ( PASURUAN ) Perkuatan Tebing K. Sumberpinang Desa. Sidogiri, Kec Kraton Kab.Pasuruan
1 pkt
KODE
UNIT ORGANISASI, NAMA PAKET, JENIS PEKERJAAN/PENGADAAN
1
2
3
2
CW2
Perbaikan Tempat Cuci Kualitas`Air
1 pkt
7,000,000
CW1
BALAI PSAWS MADIUN - MADIUN Perbaikan K. Brangkal Kab. Madiun
1 pkt
CW2
Perbaikan K. Tinil Kab. Ngawi
CW3
CW1
VII
V
CW2
III
Pengumuman Pemasukan Penawaran Pengadaan
Rp
NO
Perkuatan Tebing K. Laweyan Desa. Wates`Tani, Kec. Nguling Kab. Pasuruan BALAI PSAWS BUNTUNG PAKETINGAN ( SURABAYA )
CW1 CW2 CW3 CW4 CW5
Kali Kali Kali Kali Kali
Sumber Ngrayung Desa Salen Kec Bangsal Kab. Mojokerto Sumber Ngrayung Desa Ngrowo Kec Bangsal Kab. Mojokerto Janjing bawah Desa Kembang Ringgit Kec.Pungging Kab Mojokerto Sumber Glogok Desa Modopuro Kec Mojosari Kab. Mojokerto Kedung sumur Desa Terusan Kec Gedeg Kab. Mojokerto
II
BALAI PSAWS PUNCU SELODONO ( KEDIRI )
1 2 3 4 5
Pemeliharaan Kali Bakung Kab. Kediri Pemeliharaan Kali Bendokrosok Kab. Kediri Pemeliharaan Kali Kolokoso Kab. Kediri Pemeliharaan Kali Kedak Kota Kediri Pemeliharaan Kali Kresek Kota Kediri
1 1 1 1 1
pkt pkt pkt pkt pkt
Paket Paket Paket Paket Paket
PML PML PML PML PML
95,000,000 100,000,000 90,000,000 90,000,000 90,000,000
-
77,115,474
9,072.409
April April April April April
PML PML PML PML PML
2009 2009 2009 2009 2009
April April April April April
2009 2009 2009 2009 2009
April April April April April
2009 2009 2009 2009 2009
Mei Mei Mei Mei Mei
2009 2009 2009 2009 2009
2 2 2 2 2
bln bln bln bln bln
( Category 6 ) VII
BALAI PSAWS MADIUN - MADIUN CW1
Perbaikan K. Sono Kab. Madiun
PROCUREMENT WISMP I - TA. 2007 DINAS PU PENGAIRAN PROPINSI JAWA TIMUR
1 pkt
PL
-
May-09
May-09
May-09
Jun-09
Jul-09