PT. Insema Sunly Engineering
In 1986, Company reorganized
established at Taiwan when ten large
and registered in Indonesia by
scale of infrastructure project owned
participation of some
by the government justlaunched in
experienced engineer from one
1976. All kind of construction activies
of the biggest construction
were property in the island, our
company owned by government
company took this opportunity
in Taiwan, and set forth to step in
undertake some project especially in
the international construction
execution of pile foundation work such
market especially in Indonesia, up
as in china steel cooperation project,
to this moment, we have
Su-Oau Harbor Project, Sing-Dar Steam
successfully undertaken and
Power Plant Project, Tau-Yung
completed a number of projects,
International Airport Project, Chun-San
such as Singapore MRT project,
Expressway, City Skyway and Fei-Chei
Cilegon Steel Cooperation
Reservoir etc. We also joint venture
project,, Jakarta-Merak Tollway
with Lan Chang Churn Company to
project, Mutiara Beach
undertake construction of diaphragm
Reclamation project, etc.
wall and ground anchor of Taipei MRT Project in 1985.
Our company hold and insist on the principle below and have achieved a good reputation, those areL 1. First Priority of Safety 2. Guarantee for Quality Control 3. Responsible for Construction Management 4. Improvement of Construction Technique
1
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
PENGENALAN PERUSAHAAN
PT. Insema Sunly Engineering didirikan
Pada tahun 1986. Perusahaan mengatur
di Taiwan pada saat sepuluh proyek
susunannya kembali dan masuk di
infrastruktur skala besar milik
Indonesia dengan partisipasi para ahli
pemerintah baru saja dimulai pada
teknik berpengalaman dari salah satu
tahun 1976. Segala jenis aktifitas
perusahaan konstruksi terbasar yang
bidang konstruksi di Negara ini
dimiliki pemerintah Taiwan, dna
mempunyai prospek yang cerah oleh
melangkah maju memasuki pasar
karena itu perusahaan kami
konstruksi internasional terutama di
mengambil kesempatan ini dengan
Indonesia. Sampai pada saat ini kami
mengerjakan beberapa proyek
berhasil mengerjakan dan menyelesaikan
terutama dalam pekerjaan pondasi,
beberapa proyek, Seperti : Proyek MRT
contohnya : proyek pabrik baja kerja
Singapura, Proyek pembangunan pabrik
sama dengan R.O.C Taiwan, Proyek
baja di Cilegon, Proyek jalan tol Jakarta -
pelabuhan Su-Oau, proyek pembangkit
Merak, Proyek Reklamasi Pantai Mutiara
Tenaga Uap Sing-Dar, Proyek Bandara
dan lain lainnya.
Udara International Tau-Yung, proyek Jalan Tol Chun San Jalan Layang, bendungan Fei-Chei, dan lain lain. Selain itu kami juga bekerja sama dengan perusahaan Lan Change Churn untuk pekerjaan Diaphragm wall dan ground anchor pada proyek MRT di Taipei pada tahun 1985.
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
Perusahaan kami memegang dan menekankan prinsip di bawah ini dan telah memperoleh reputasi yang baik yaitu : 1. Prioritas utama adalah keselamatan 2. Jaminan akan pengawasan mutu 3. Jaminan terhadap manajemen konstruksi
E:
[email protected]
W: www.sunlyengineering.com
2
ORGANIZATION CHART
BOARD OF COMMISIONERS
PRESIDENT DIRECTOR
GENERAL MANAGER
MANAGER OF FINANCE
MANAGER OF OPERATIONS
MANAGER OF MARKETING
ADMINISTRATION DIVISION
ESTIMATION/QS DIVISION
FINANCE DIVISION
BUSINESS DEVELOPMENT
ACCOUNTING DIVISION
TECHNICAL & ENGINEERING DIVISION PROCUREMENT DIVISION WAREHOUSE DIVISION
PROJECT 1
3
A: Taman Kebon Jeruk Blok I-3 No. 9
PROJECT 2
T: (021)5870657
F: (021) 5870672
E:
[email protected]
PROJECT 3
W: www.sunlyengineering.com
1. General Construction Works
SCOPE OF SPECIALITY
2. Foundation Works - Driven Pile - Bored Pile - Secant Pile - Sheet Piling (Steel & Concrete) - Diaphragm Wall - Ground Anchor 3. Soil Improvement Works - Vertical Drains (Sand & Wick Drain) - Gravel Pile (Compacted Sand-Gravel & Stone Column) - Vacuum Preloading System - Grouting Work - DCM (Deep Cement Mixing) Piles - CFG (Cement Fly-Ash Gravel) Piles 4. Test Works - PDA and PIT Test - Static Loading Test 5. Dredging and Reclamation
1. Kontraktor Umum
BIDANG PEKERJAAN
2. Pekerjaan Pondasi - Tiang Pancang - Tiang Bor - Secant Pile - Sheet Piling (Baja & Beton) - Dinding Diapragma - Ground Anchor 3. Perbaikan Tanah - Vertical Drains (Sand Drain and Wick Drain) - Tiang Gravel (Tiang Padat Pasir-Batu & Kolom Batu) - Vacuum Preloading System - Pekerjaan Grouting - Tiang DCM - Tiang CFG 4. Kerja Uji - Tes PDA & Tes PIT - Tes Pembebanan 5. Dredging dan Reklamasi.
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
4
EXPERIENCE MAP
9
13
8 14
11
12
6 1 7
2
5
3
MAIN PROJECT AREA
5
1
INDRAMAYU – JAWA BARAT
PLTU 1 JAWA BARAT 3x330 MW
2
PELABUHAN RATU – SUKABUMI – JAWA BARAT
3x350 MW FIRED POWER PLANT
3
PACITAN – JAWA TIMUR
2x315 MW POWER PLANT
4
MAKASSAR – SULAWESI SELATAN
PLTU 2x50 MW
5
CILACAP – JAWA TENGAH
1x660 MW POWER PLANT (TEST PILING) & STONE COLUMN PILES INSTALLATION
6
KARAWANG – JAWA BARAT
INSTALLATION THE PC (SPUN) PILE WORK WITH Dia.30 cm PT DEANSHOES
7
SENTUL - BOGOR
BORED PILE INSTALLATION with Dia.60cm in P3SON
8
TANJUNG PRIOK - TIMUR
PRE-DRILLING AND PILING SPUN PILE with Dia. 60cm
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
4
9
PERAWANG - RIAU
INSTALLATION SAND DRAIN PILE WORKS with Dia. 45 & 50 cm
10
RAWAMANGUN – JAKARTA TIMUR
INSTALLATION THE BORED PILE WORKS with Dia.60cm, Dia.80cm, Dia.100cm
11
CIWANDAN - BANTEN
CONSTRUCTION WORK OF CIWANDAN GRINDING PLANT
12
TABALONG – KALIMANTAN SELATAN
HILO CEMENT PROJECT
13
KENDAWANGAN – KALIMANTAN BARAT
INSTALLATION BORED PILE with Dia. 60cm and 80cm
14
MARGONDA DEPOK – JAWA BARAT
FEMALE SANCTUARY
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
6
Driven Pile
Tiang Pancang
Driven Pile belongs to displacement pile group
Tiang pancang termasuk golongan displacement
that will displace soil mass to nearby place. In general, driven pile is selected where the soil is squeezable and dont containt boulders. If site is generally open and there is no objection to noise and vibration around the construction site. Driven pile consist of steel pile, precast concrete pile (triangular square, circular, etc) and timber pile. We have all the techniques and years of experiences in driving this type of piles, both onshore and offshore.
7
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
pile yang akan memindahkan massa tanah ke sekitarnya. Pada umumnya tiang pancang dipilih apabila keadaan tanah bersifat lunak (mudah dipancang) dan tidak mengandung batu bolders (Baulders) dan bila kebisingan dan getaran diperbolehkan oleh lingkungan sekitarnya. Tiang pancang dapat terbuat dari baja, beton, precast (segitiga, persegi, bundar, dll), kayu. kami telah menerapkan semua teknik dan kami telah memiliki pengalaman pilling di darat maupun laut selama bertahun tahun.
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
Bored Pile Driven Pile belongs to non-displacement pile group, it can be drilled by mechanical spiral plate or bucket augers, or by grabbing rigs.
Tiang Bor Tiang bor merupakan golongan non displacement pile. Yang dapat dikerjakan dengan menggunakan mechanical spiral plate atau bucket augers atau grabbing rigs.
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
8
Secant Pile Secant pile is the manufacture of bored piles constructed in such meetings so as to form a watertight wall.
Secant Pile Secant Pile adalah pembuatan beberapa tiang bor yang dikonstruksi secara rapat sehingga membentuk seperti dinding kedap air
9
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
Sheet Pile (Steel & Concrete) Sheet Pile (Baja & Beton) Sheet piles are designed to compose a temporary or
Sheet pile mempunyai fungsi sebagai dinding
permanent retaining wall to resist soil and water pressure.
penahan tanah sementara atau permanen untuk
It is wildly applied for construction of foundation,
menahan tekan horizontal tanah dan air. Biasa
basement, jetty, dock, intake and channel etc. In general it
digunakan untuk konstruksi pondasi, struktur bawah
is made of steel, reinforced concrete or wood and is
tanah, jetty, dok kapal, kanal pengmbilan air (intake
installed by driving hammer or vibrating hammer.
chanel). Dapat terbuat dari baja, beton bertulang
There are two types of sheet pile is :
atau kayu dan dipasang dengan cara dipasang
1. Steel Sheet Pile
dengan pukulan hammer atau getaran hammer
2. Concrete Sheet Pile
(vibrator hammer). Ada dua jenis Sheet Pile yaitu: 1. Steel Sheet Pile 2. Concrete Sheet Pile
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
10
Diaphragm Wall
Diaphragm Wall
Diaphragm wall is a cast in place reinforced or
Diaphragm Wall adalah dinding penahan tanah
plain concrete retaining wall constructed by a
yang terbuat dari beton bertulang yang dicor
special designed trench equipment with
di tempat atau dibeton, dibangun dengan
multiple drill head or clamshell bucket. The
menggunakan alat penggalian parit untuk
speciality in this method is to apply stabilizing
Diaphragm Wall yang didesain khusus dengan
fluid (bentonite slurry or polymer slurry) for
multiple drill head atau clamshell bucket,
preventing collapse of excavated trench.
kekhususan dari metode ini adalah dengan menggunakan cairan penstabil. (Bentonite atau polymer) untuk mencegah dari penggalian parit tersebut.
11
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
Ground Anchor Ground anchor is used for temporary earth retaining work and For Permanent Structure. The steel tendon left underground will become on obstacle affecting the construction of foundation works of the adjacent building, so it seems necessary to remove
Ground Anchor Ground anchor biasanya digunakan untuk pekerjaan dinding penahan tanah sementara untuk struktur permanen. Tendon baja yang ditanam dalam tanah akan menjadi halangan yang mempengaruhi konstruksi pekerjaan pondasi dari bangunan yang berdekatan, sehingga perlu dipindahkan.
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
12
13
Vertical Drain
Vertikal Drain
Vertical Drains are artificially created drainage paths which
Vertical Drains merupakan jalan pengeluaran air pori
can be installed by one of several methods and which can
secara buatan, dapat dipasang dengan beberapa
have variety of characteristics. The use of vertical drains
metode dan mempunyai beberapa macam
along with precompressions has the sole purpose of
karakteristik. Penggunaan vertikal drains dapat
shorting the drainage path of the pore water, there by
dikombinasikan dengan prakompresi dengan tujuan
accelerating the rate of primary consolidation.
untuk memperpendek jalan pengeluaran air pori
There are two types of vertical drain work:
sehingga mempercepat proses konsolidasi primer.
1. Sand Drain
Ada dua tipe dari vertical drain yaitu:
A sand draind is a asimple process employing column of at
1. Sand Drain
least 10 inches in width augered into ground to be
Sand Draind adalah kolom pasir yang dibuat dengan
surcharged & consolidated. The column is then filled with
alat preboring yaitu auger dengan diameter kurang
sand and connected to a free, draining blanket of granular
lebih 10 inchi. Tanah asli yang dipindahkan, diganti
soil.
dengan pasir sehingga tanah bisa lebih padat.
2. Wick Drain
2. Wick Drain
By entering band synthetic form as a way to drain the
Dengan memasukkan band berbetuk drain sintetis
water into the ground, so there are no empty pores in the
sebagai jalan untuk air menuju permukaan tanah,
soil and the soil becomes solid.
sehingga tidak ada pori pori kosong dalam tanah.
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
Gravel Pile
(Compaction Sand-Gravel Pile and Stone Column Pile) Stone column is one method of soil improvement both on clay and sandy soils. On clay, the use of stone column can enhance and improve soil bearing capacity problems. Material sand-gravel can be used but depend on type of soil.
Tiang Gravel
(Tiang Pasir-Batu Padat dan Tiang Kolom Batu) Stone column merupakan salah satu metode perbaikan tanah baik pada tanah lempung maupun tanah berpasir. Pada tanah lempung, penggunaan stone column dapat meningkatkan dan memperbaiki masalah daya dukung tanah. Material Pasir-Batu dapat digunakan tetapi bergantung akan jenis tanah dasar.
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
14
Vacuum Preloading System
Vacuum Preloading System
Soil improvement methods that accelerate the
Metode perbaikan tanah yang mempercepat proses
consolidation process without disturbing the surrounding
konsolidasi tanpa mengganggu lingkungan sekitar. Sistem
environment. The system uses vacuum load of 80 kPa as a
ini menggunakan beban vakum sebesar 80 kPa sebagai
substitute for conventional preloading. Nevertheless, if
pengganti prabeban konvensional. Meskipun begitu, jika
the load required to achieve the target soil improvement
beban yang dibutuhkan untuk mencapai target perbaikan
is greater than the vacuum load, the additional load can
tanah lebih besar daripada beban vakum, beban
be placed on a pile of the vacuum system.
tambahan berupa timbunan bisa ditempatkan di atas sistem vakum ini.
15
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
Grouting Work
Grouting Work
Grouting is one of techniques of soil
Grouting adalah salah satu teknik dalam
improvement, the main function are to achieve
perbaikan tanah. Fungsi utamanya adalah
a stronger, denser and less permeable soil or
untuk menambah kekuatan, kepadatan dan
rock, reduce settlement of stratum and fill the
mengurangi sifat permeable dari tanah atau
void aroud lower ground structure. This
batu, mengurangi penurunan pada lapisan
technique is to insert some kind of stabilizing
tanah dan mengisi pori-pori di sekeliling
agent into the ground by pressure grouting
struktur bawah tanah. Grouting adalah teknik
machine, the pressure forces the agent onto
menginjeksikan semacam larutan penstabil ke
the soil void around the injection tube, then
dalam tanah dengan tekanan dari mesin
the chemical agent or cement mortar reacts
grouting, tekanan tersebut mendesak larutan
with the soil to form a stable mass as we
ke dalam pori-pori tanah dalam ruangan yang
desired.
void di sekitar pipa injeksi. Larutan tersebut, semen atau kimiawi, bereaksi dengan tanah dan membentuk massa yang stabil.
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
16
Deep Cement Mixing Piles
Deep Cement Mixing Piles
Deep Soil Mixing (DSM) is a soil remediation technology
Deep Soil Mixing (DSM) adalah teknologi perbaikan tanah
that is used to build a retaining wall and a cutoff or treat
yang digunakan untuk membangun cutoff atau dinding
the groud. The land where the soil is mixed with cement
penahan dan memperlakukan tanah. Tanah dicampur
reagents or others. Reagent is injected through the
dengan bahan reagen semen lainnya. Reagen disuntikkan
hollow rotating kelly bar, with some types of cutting
melalui kelly bar berongga yang berputar, dengan
equipment on the bottom. Kelly bar at the top of the
beberapa jenis peralatan pemotong di bagian bawah.
apparatus may have additional auger discontinuous and/
Kelly bar di atas alat dapat memiliki auger tambahan
or mixing paddles or blades.
diskontinu dan / atau paddles pencampur atau pisau.
17
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
Cement Fly-Ash Gravel Piles CFG (Cement Fly-Ash Gravel) Pile is consisted with gravel, sand, fly ash mixed with cement and water, and the typical characteristic is its variable strength, In different cement content and mix proportion condition, the strength grade of CFG is between C15 to C25. Working principle of CFG Pile.
Cement Fly-Ash Gravel Piles CFG (Cement Fly-Ash Gravel) juga dikenal sebagai CFG Pile terdiri dari kerikil, pasir, fly-ash dan dicampur dengan air dan semen. CFG pile mempunyai karakteristik kuat tekan yang bervariasi, tergantung dari kadar semen dan kondisi proporsi campurannya yaitu antara C15-C25. Prinsip Kerja dasar CFG pile adalah sebagai pondasi komposit dimana CFG pile sendiri dan tanah berada diantaranya.
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
18
Pile Driving Analyzer
Pengujian Dinamis Tiang
A Pile Dynamic test is based on one dimension
Pengujian dinamis tiang ini didasarkan pada
wave analysis which occur when the pile is
analisis gelombang satu dimensi yang terjadi
being blowed by a hammer. A measurement
ketika tiang dipukul oleh palu. Pengukuran ini
recorder by PDA and analyzed by case method
direkam oleh PDA dan dianalisis dengan case
that generally has been known based on one
method yang sudah umum dikenal
dimension wave theory. PDA result can be
berdasarkan teori gelombang satu dimensi.
analyzed further by using CAP-WAP
Hasil PDA dapat dianalisis lebih lanjut
programmer.
menggunakan program CAPWAP
Pile Integrity Test
Pengujian PIT
The Pile Integrity Tester make sure that a pile
The Pile Integrity Tester memberikan kepastian
of shaft is free of major cracks and voids, prior
bahwa poros bebas dari retakan besar atau
to construction of the superstructure/upper
lubang, sebelum pembangunan struktur
structure. It may be used on most concrete or
atasnya. Ini dapat digunakan pada beton atau
wood foundations. The PIT May also be used to
kayu yang paling dasar. PIT juga dapat
test piles integral in the structure, such as
digunakan untuk menguji tumpukan integral
those supporting existing bridges or towers,
dalam struktur, seperti yang mendukung
and may assess their length.
jembatan atau menara yang ada, dan kepastian panjangnya sampai dasar.
19
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
Static Loading Test
Static pile loading test is executed on experiment pile to
determine the settlement under working load, and the
ultimate bearing capacity caused by the maintained load.
Tes Pembebanan Statis
Tes pembebanan statis tiang dilaksanakan terhadap tiang
percobaan, untuk menentukan besarnya penurunan akibat
beban bekerja dan daya duung tiang akibat beban statis.
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
20
WORKING EXPERIENCE 1981 - Present Bored Pile Work with RCD (Reverse Circulating Drilling) Method and Diaphargm Wall; MRT Taipei City Project, RSEA - Taipei – Taiwan. 1990 - 1995 Bridge Work and Material Suppply; Tangerang – Merak Highway Project, West Java – Indonesia. 1992 - 1995 Reclamation & Vertical Drain Work; Pantai Mutiara Phase II Project, Jakarta – Indonesia. 1992 - 1995 Compaction Stone Piles Work; Suralaya Coal Fired Power Plant (4000 MW Unit 4, 5, 6); Indonesia. 1995 - 1996 PC Piles; Pasar Ikan Highway Project, HUTAMA KARYA; Jakarta – Indonesia. 1996 - 1997 Piling Work; Kalimalang Flyover Project, HUTAMA KARYA; Jakarta – Indonesia. 1996 - 1998 Piling Work; IKPP Perawang Unit 4 x 50 MW Extension Riau Power Plan Project; Riau – Indonesia. 1996 - 2001 Boring & Grouting Work; Batutegi Dam Project, Lampung - Indonesia. 1999 - 2001 Bored Pile Work with RCD (Reverse Circulating Drilling) Method; 101 Building Taipei City Project; RSEA Taipei - Taiwan. 2002 - 2003 Bridge Work Sadang Pedestrian Bridge (Cipularang) Highway Project, West Java - Indonesia. 2003 - 2004 PC Piles; Suprapto & Pasar Rebo Flyover Project; HUTAMA KARYA; Jakarta - Indonesia. 2003 - 2004 Piling & Bored Pile (For Harbour Project); Semblok - Kabil & Batu Ampar Jetty Project; HUTAMA KARYA; Batam - Indonesia. 2004 - 2005 PC Piles; Jati Asih Under Pass (JORR) Project; NINDYA KARYA; Jakarta - Indonesia. 2004 - 2005 Piling Work; Darangdan, Cileunca, Cikubang, (Cipularang) Highhway Project; West Java - Indoesia. 2004 - 2005 Bored Pile Work (With Full Casing Methode); Cisomang, Cilame Bridge, (Cipularang) Tol Way Project; West Java - Indonesia. 2005 - 2006 Bored Pile Work (With Full Casing Methode); TPK Kodja Tj, Priok, Dermaga 3 & 4 Project; WASKITA KARYA; Jakarta - Indonesia. 2005 - 2006 Piling & Bored Pile Work (With Full Casing Methode); Optimum Facility Terminal B Tj. Priok Project; HUTAMA KARYA; Jakarta - Indonesia. 2005 - 2006 Steel Pipe Piles; Tarahan (2x200 MW) Coal Fired Power Plant; ADHI KARYA - TOA Joint Operation; Indonesia. 2006
Concrete Sheet Piles(ø 1 m, L=17 m); Cilaja Coal Fired Power Plant; Chen Dar - China.
2006
Concrete Sheet Piles(ø 1 m, L=16 m); Bojonegoro Coal Fired Power Plant; SUMITOMO - WIJAYA KARYA Joint Operation; Indonesia.
2006 - 2007 Piling Work; Indralaya - Palembang Coal Power Plant Piling Work. 2006 - 2007 Bored Pile Work (With Full Casing Method, L=34 m); Pekanbaru - Riau Government Building; HUTAMA KARYA; Riau - Indonesia. 2007 - 2008 Concrete Sheet Pile & Driving Spun Pile Work for Bridge Work (Jembatan Sungai Siak, Riau); HUTAMA KARYA; Riau - Indonesia.
21
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
WORKING EXPERIENCE 2007 - 2009 Vertical Sand Drain Piles Work and Material Supply, PLTU 1 Jawa Barat, 3x330 MW Coal Fired Power Plant Project; BUT CNEEC; West Java - Indonesia. 2009 - 2010 Compaction Stone Column Piles Work; PLTU 2 Jawa Barat 3x350 MW Coal Fired Power Plant; BUT SHANGHAI ELECTRIC; West Java - Indonesia. 2009 - 2010 Compaction Stone Column Piles Work; PLTU 1 Jatim - Pacitan 2x315 MW Coal Fired Power Plant Project; BUT HUBEI HINGYUAN; East Java - Indonesia. 2009 - 2011 Road & Drainage System Construction Works; PLTU 1 Jawa Barat, 3x330 MW Coal Fired Power Plant Project; BUT CNEEC; West Java - Indonesia. 2010
Test Piling of Bore Pile, Driven PHC and Steel Pipe Pile Works; PLTU 2 Jateng 1x660 MW Coal Fired Power
2011
Compaction Stone Column Piles Work; PLTU 2 Sulawesi Selatan, 2 x50 MW Coal Fired Steam Power Plant
2011
Installation the Bored Pile Works; P3SON hambalang Sentul. Bogor, West Java - Indonesia.
2011
Installation the Bored Pile Works; RSUP PERSAHABATAN; WIJAYA KARYA; Bogor West Java - Indonesia.
2012
Pre-Drilling and Piling Spun Pile; Strengthening and Deepening of Pier sec. 303, 304 & 305 Tanjung Priok
2012
Compacted Sand Drain Pile and Piling Spun Pile Works at Coal Yard Area IKPP perawang; Pekanbaru, Riau -
2012
DCM (Deep Cement Mixing) Pile at Coal Yard Area IKPP Perawang; pekanbaru, Riau - Indonesia.
Plant Project; Adipala - Cilacap; BUT CNTIC; Central Java - Indonesia. project; BUT HUBEI HONGYUAN; South Sulawesi - Indonesia.
harbor; ADHI KARYA; North Jakarta - Indonesia. Indonesia. 2012 - 2013 Installation the Stone Column Piles Work at RFCC - PERTAMINA; ADHI KARYA; Cilacap, Central java Indonesia. 2012 - 2013 Loading Test Works and Piling Spun Pile Works of Ciwandan Grinding Plant; FUTAI ENGINEERING; Cilegon Indonesia. 2013
Installation the Bored pile Works; HILO CEMENT PROJECT; PT. SINO GANSU NO.1 CONST; Tanjung Tabalong - South Kalimantan.
2013
Installation the Compaction Gravel Column; Cilacap 1x660 MW Coal Fired Steam Power Plant Project; BUT SINOHYDRO; Central Java.
2014
Compacted Sand Drain Pile and Piling Spun Pile Works at Container Yard area and Tissue Block Area IKPP perawang; Pekanbaru - Riau.
2014 - 2015 Installation the Bored pile Works; WEI QIAO INDONESIA ALUMUNIUM OXIDE BORED PILE PROJECT; BUT HEBEI; Kediuk, Kendawangan - West Borneo. 2015
Installation the Bored Pile Works; HILO CEMENT PROJECT; PT. MCC17 KONSTRUKSI INDONESIA; Tanjung Tabalaong Phase 2 - South Kalimantan.
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
22
License Name
: PT. INSEMA SUNLY ENGINEERING
Company Registration
: PEM-0048 / WPJ.07 / KP.0903 / 2009
Taxpayer Registration Number
: 01.071.872.4-059.000
Trade Business License
: 932/T/PU/2008
Special Member Certificate
: GAPENSI (National Contractors Association of Indonesia) Nomor 09.74.34.1161.08.14419
Certificate of Quality
: ISO 9001:2008 - Certificate No. 1015QBV80
Certificate of SBU
: SBU Jasa Pelaksana Konstruksi
Telephone
: (021) 587 0657
No Reg. 0-3174-16-002-2-09-909131
23
Fax
: (021) 587 0672
Homepage
: www.sunlyengineering.com
E-mail
:
[email protected]
Address
: Taman Kebon Jeruk Blok I-3 No. 9 West Jakarta 11630, Indonesia
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
24
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
25
26
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
27
OUR PAST PROJECT 28
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
OUR PAST PROJECT
Compaction Stone Column Piles Works Stone Column Piles Work, Pelabuhan Ratu 3x350 MW Fired Power Plant Project BUT Shanghai Electric. Location: Pelabuhan Ratu - Sukabumi, West Java, Indonesia
Vertical Sand Drain Works Sand Drain Piles Work, PLTU 1 Jawa Barat 3x330 MW Power Plant Project BUT CNEEC/Sinomach, Location: Indramayu-West Java-Indonesia
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
29
OUR PAST PROJECT
Bore Pile Works Bored Pile Works, PLTU 2 Jateng 1x660 MW Power Plant Project (Test Piling) BUT CNTIC. Location : Adipala-Cilacap, Central Java, Indonesia
Pre-Drilling and Piling Spun Pile Works Pre-Drilling and Piling Works, Tanjung Priok Harbour Sec.303,304,305 PT. Adhi Karya (Persero) Tbk. Location: Tanjung Priok-North Jakarta, Indonesia
30
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
OUR PAST PROJECT
Piling Spun Pile Works Piling Spun Pile Works, Sand Drain Work At Coal Yard Area (Soil Improvement) PT. Pindo Deli Pulp & Paper Mills. Location : Perawang-Pekan Baru, RIau, Indonesia
Vacuum PreLoading System
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
31
OUR PAST PROJECT
Dredging & Reclamation
Dredging Work, Vertical Drain Work at Pantai Mutiara Phase II Project, RSEA Engineering Corporation Location :
Pantai mutiara, north Jakarta, Indonesia
32
A: Taman Kebon Jeruk Blok I-3 No. 9
T: (021)5870657
F: (021) 5870672
E:
[email protected]
W: www.sunlyengineering.com
OUR PAST PROJECT
Offshore Piling Method
Piling PC Spun Pile Work and Supply Material PC Spun Pile Work at Zun - Shu Bridge