COMPANY OVERVIEW PT. Adikari Wisesa Indonesia is a maintenance service provider. Our services are maintenance activities such as: operation and maintenance contract, corrective maintenance, predictive maintenance and maintenance optimization. We also handle troubleshooting for mechanical and electrical problems. Our company offers solutions to improve reliability with the latest technology and optimum method. All of our daily activity is carried with standard procedure which is integrated with system and could be monitored. Working with high integrity, based on the best standard, supported with experienced human resources with international certificates and supported by high capability workshop, we guarantee all our services and products will be the best in its field. Our top success parameter is the customer’s satisfaction.
Vision Becoming The Word Class Company in Maintenance Services and Equipment Provider based on latest technology.
Mission Becoming The Best Company on Its field in Indonesia by helping domestic industry reducing its dependency on foreign maintenance services and equipment supports. Facilitating our Human Resources to produce high technology and useful product for Maintenance Field.
OFFICE LOCATION
Komplek Rukan Sentra Pemuda Jl. Pemuda No. 61 Kavling 19 Jakarta 13220
ORGANIZATION CHART DIRECTOR RILLY HUTABARAT
R&D TRI WAHYUDI
ENGINEERING YULIAN ANDRE
MARKETING TUMPAL N.
GA & FINANCE TOFAN ASMORO
OUR SERVICES I. Mechanical Equipment Overhaul (Diesel Engine, Gas Engine, Compressor, Pump, Blower, etc)
II. Electric Motor Overhaul & Generator
III. Maintenance Setup RCM (Reliability Centered Maintenance) program. Plant operation and Maintenance. Predictive Maintenance (Conditioning Monitoring).
IV. Transformer Maintenance and Monitoring
Dissolved Gas Analysis (DGA) Test Breakdown Test (BDV) Test) Thermal Image Analysis Overhaul & Oil Treatment
V. Vibration Analysis
In-Situ Balancing. Laser Alignment. Bump Test. Orbital Analysis. Run-Up and Coast-Down Analysis. Advance Transient Analysis. Operational Deflection Shape (ODS). Structural & Piping Analysis. Special Measurement for Vibration Data.
VI. Training
Diesel Engine Maintenance Training. Motor Electric Maintenance Training. Basic Vibration Analysis Training. Advanced Vibration Analysis Training. RCM (Reliability Centered Maintenance) Training. Maintenance management Training.
SOME LIST OF EQUIPMENTS
Thermal Imager, Fluke Ti 10. Vibration Analyzer, IRD 258. Multi Channel Analog to Digital Converter (ADC). Low Frequency Accelerometer with Analog Integrator. Dissolved Gas Analyzer, Morgan Schaffer. Exhaust Gas Analyzer. Ultrasonic Analyzer. Pico 216 and Picoscope Software.
DGA Morgan Schaffer
Sound CTRL
Fluke Ti 10
IRD 258.
PROJECT EXPERIENCES LIST DATE November 2008 December 2008
ACTIVITY Conditioning monitoring based on vibration data (contract 6 month), PLTU 2X100 MW. Overhaul diesel engine, Caterpillar 3512.
December 2008
Training: Basic Vibration Analysis.
December 2008
Gearbox overhaul, Flender Siemens.
Januari 2009
Februari 2009 April 2009 Mei 2009
Conditioning Monitoring for transformer 20 kV based on DGA, BDV, and thermal image data. Injector Test and repair, Caterpillar 3512. Vibration analysis for commissioning test on steam turbine generator. Transformer oil purification, transformer’s brush 2500 kVA, 3300 – 440 volt.
Juni 2009
Service of transformer’s brush 2500 kVA, 3300 – 440 volt.
Juli 2009
Overhaul 2 (two) unit Main Booster Pump Engine (Caterpillar 3512) Recondition 3 (three) unit Booster Pump Engine (Caterpillar 3516) Contract Maintenance of 13 unit Diesel Engine of Caterpillar, Cummins & Perkins Training: RCM (Reliability Centered Maintenance) Transformer DGA Analysis
Agustus 2009 July 2009 Oktober 2009 October 2009 December 2009
Control speed modifications professor
CLIENT PT. PLN (Persero) Sektor Tarahan PT. Pertamina UPms III Balongan PT. PLN (Persero) Sektor Belawan. PT. Pertamina (Persero) UPms III Balongan. PT. PLN (Persero) Jasa Sertifikasi. PT. Pertamina (Persero) UPms III Balongan. PT. Tivico, Tangerang. PT. Indofood Sukses Makmur Tbk (Bogasari Flour Mils). PT. Indofood Sukses Makmur Tbk (Bogasari Flour Mils). PT. Pertamina (Persero) S& JJB Balongan PT. Pertamina (Persero) Cikampek. PT. Pertamina (Persero) S&JJB Balongan PT. PLN (Persero) Sektor Tarahan PT. PLN (Persero) Sektor Tarahan PT. Pertamina (Persero) S& JBB Balongan
PROJECT EXPERIENCES LIST DATE Januari 2010
ACTIVITY Contract Maintenance of 13 unit Diesel Engine of Caterpillar, Cummins & Perkins Perbaikan Kebocoran Pada Engine Genset Perkins 800 kVA No. 2(Old) di Lokasi S & D Region II JBB TTU Balongan
CLIENT PT. Pertamina UPms III Balongan PT. Pertamina UPms III Balongan
April 2010
Perbaikan Compressor Air Starting No.2 Engine BLP No.1 & Perbaikan Motor Fan Radiator Gearbox MBP No. 3
PT. Pertamina UPms III Balongan
April 2010
Pek. Pemisahan Panel MBP, BLP, Compressor dan Perbaikan Soft Starter ATS 48(Altistart 48) pada Pompa Suction Booster
PT. Pertamina (Persero) UPms III Balongan
Mei 2010
Tune Up Generator Set Detroit 149 - Kohler
PT. Pertamina Bina Medika
Mei 2010
Perbaikan Turbo Charger Generator Set Detroit 149 - Kohler
PT. Pertamina Bina Medika
Juni 2010
Perbaikan / Tune Up Generator Set Cummins 350 Kva
PT. Nindya Karya
Juni 2010
Top Overhaul Engine Backloading Pump (CAT 3412) No. 3 TTU Balongan
PT. Pertamina UPms III Balongan
Juni 2010
Pengadaan Jasa Penyusunan FMEA untuk Boiler, Turbin & alat bantunya
PT. PLN (Persero) Sektor Tarahan
Juli 2010
Pekerjaan Analisa Jasa Vibrasi PLTU Tarahan Unit 3 & 4
PT. PLN (Persero) Sektor Tarahan
Juli 2010
Pengadaan Jasa Coal Fired Analysis Boiler PLTU Tarahan Unit 3
PT. PLN (Persero) Sektor Tarahan
Juli 2010
Perbaikan Turbo Charger Generator Set Detroit 149 - Kohler
PT. Pertamina Bina Medika
Pengecekan dan Perawatan Trafo 1, 2 dan 3
Ekalokasari Plaza
April 2010
Agustus 2010
PROJECT EXPERIENCES LIST DATE September 2010
ACTIVITY Pengadaan Jasa Permodelan & Simulasi Computational Fluid Dynamic (CFD)
CLIENT PT. PLN (Persero) Sektor Tarahan
Januari 2011
Pengadaan Test DGA Lanjutan Power Transformer
Januari 2011
Contract Maintenance of 13 unit Diesel Engine of Caterpillar, Cummins & Perkins
PT. PLN (Persero) Sektor Bandar Lampung PT. Pertamina UPms III Balongan
Januari 2011
Assesment Power Transformer PLTD/G Tarahan & PT. PLN (Persero) PLTA Besai Sektor Bandar Lampung
Februari 2011
Pemeliharaan Trafo Common Auxiliary & Main Trafo Unit 1,2,3 dan 4 PLTU Bukit Asam
PT. PLN (Persero) Sektor Bukit Asam
Februari 2011
Ass Power Transformer PLTD Teluk Betung
PT. PLN (Persero) Sektor Bandar Lampung
PLTD Tegineneng & PLTA Batutegi Februari 2011
Pemeliharaan Engine Unit Pompa berikut Panel Power Main Booster Pump ( 3 unit ), Backloading Pump ( 3 unit ), Genset TTB-Depot ( 3 Unit), Suction Booster Pump (4 Unit ), Booster Pump Cikampek ( 3 Unit ) dan pompa depot (16 unit )
PT. Pertamina Upms III Balongan
Top Overhaul Engine Main Booster Pump # 3 (CAT 3512)
PT. Pertamina UPms III Balongan
Kontrak Pemeliharaan 2 unit genset
BPKP
Mei 2011
Pengadaan Butterfly Valve
PT. Trimitra Wisesa Abadi
Mei 2011
Overhaul 1 unit engine berikut pompa pemadam depot & penataan ulang jalur pipa suction pompa pemadam TTB, lokasi TBBM Balongan
PT. Pertamina Upms III Balongan
Juni 2011
Pengadaan Ball Valve
PT. Sulfindo Adiusaha
Maret 2011
Maret 2011
PROJECT EXPERIENCES LIST Juli 2011
Pengadaan Globe Valve
CV. Fikri Jaya Abadi
Juli 2011
Pemeliharaan Engine Unit & Pompa berikut Panel Power Main Booster Pump ( 3 unit ), Backloading Pump ( 3 unit ), Genset TTB-Depot (3unit), Suction Booster Pump ( 4 unit ), Booster Pump Cikampek (3 unit) dan pompa produk depot ( 16 unit )
PT. Pertamina Upms III Balongan
Juli 2011
Perbaikan Genset Engine Perkins
RSUD Tarakan
Overhaul 1 unit engine & pompa pemadam Merk Cummins No.2 lokasi TBBM Balongan
PT. Pertamina Upms III Balongan
November 2011 November 2011
Oil Analysis DGA Trafo Merk Trafindo 1250 KVA
Hotel Kawanua Aerotel
Jasa General Overhaul Engine Main Booster Pump No.#1 Caterpillar 2512 Kap.1380 HP
PT. Pertamina Upms III Balongan
November 2011 November 2011 November 2011
Pengadaan Valve Base Line Program for Equipment
PT. Multisarana Citra Perkasa PT. Bukaka Teknik
Pengadaan Jasa Pemodelan Dan Simulasi Computational Fluid Dynamic ( CFD )
PT. PLN Sektor Pembangkitan Tarahan
Agustus 2011
Desember 2011 Penggantian Sparepart pada pekerjaan perbaikan MBP No. 2 Caterpillar 3512 di terminal BBM Balongan
PT. Pertamina Upms III Balongan
Januari 2012
Pemeliharaan Engine Unit & Pompa Berikut Panel Power Main Booster Pump ( 3 unit ), Backloading Pump ( 3 unit ), Genset TTB Jalur 1 & Depot ( 3 unit ), Suction Booster Pump ( 3 unit ) Lokasi Terminal BBM Balongan
PT. Pertamina Upms III Balongan
Februari 2012
Oil Analysis DGA Trafo 2 Unit – 80 MVA ( Top, Middle, Bottom, Oil Main Tank )
PT. Eramas Persada Energi
PROJECT EXPERIENCES LIST Februari 2012
Pemeliharaan 3 ( tiga ) unit Trafo dan 3 ( tiga ) unit PT. Pertamina Upms III kubikal Balongan
Maret 2012
Penggantian Sparepart Kebutuhan Rutin MBP, BLP, Genset, Booster Pump Cikampek dan SBP
PT. Pertamina Upms III Balongan
Maret 2012
Pemeliharaan Panel & Trafo
PPATK
April 2012
Pengujian Minyak Transformer Unit 3,4 & 5,6
Mei 2012
Installing ACB and Proctector Under/Over Volt relay
PT. PLN Sektor Pembangkit Tarahan PT. Trakindo Utama
Mei 2012
Perbaikan Flexible Hose Untuk Generator Set
RSPP
Juni 2012
Rewinding dan Overhaul 1 ( satu ) unit generator merk perkins 500 KVA di Depot Terminal BBM Balongan
PT. Pertamina Upms III Balongan
Juni 2012
Jasa Analisa Minyak Pelumas Turbin dan Bahan Bakar MInyak
PT. PLN Sektor Pembangkit Tarahan
Juli 2012
Perbaikan / Penggantian exhaust engine MBP 3 unit dan engine BLP 3 unit
PT. Pertamina Upms III Balongan
Agustus 2012
Penggantian Sparepart pada General Overhaul MBP No.3 Caterpillar 3512
PT. Pertamina Upms III Balongan
Agustus 2012
Penggantian Crankshaft yang rusak diluar paket overhaul MBP No. 3 Caterpillar 3512 Kap. 1.355 HP SN. 49Y0105
PT. Pertamina Upms III Balongan
Agustus 2012
Penggantian sparepart general overhaul MBP No.3 Catterpillar 3512 ( Paket 2 )
PT. Pertamina Upms III Balongan
Agustus 2012
Pengadaan Jasa Training Asset Management
Agustus 2012
Jasa Pengetesan Tan Delta
PT. PLN Sektor Bengkulu PT. PLN Sektor Ombilin
PROJECT EXPERIENCES LIST September 2012
Vibrasi Overal Level, Vibrasi Spectrum Analysis, Vibrasi Phase Analysis, Vibrasi Orbit Analysis
PT. Bekasi Power
Oktober 2012
Tune Up & Penggantian Filter Genset Perkins 500 KVA dan 750 KVA
Wisma & Apartemen Mitra Sunter
November 2012
Jasa Analisa RVPOT
November 2012
Pengujian Oil Analysis DGA
PT. PLN Sektor PLTGU Cilegon PT. PLN Sektor Jambi
Januari 2013
Manpower Lump Sum, 1 person of RCM Project Manager, 3 Person of RCM Engineer
PT. Pakarti Tirto Agung
Januari 2013
Pemeliharaan Panel 1 tahun
Gedung PPATK
Januari 2013
Pemeliharaan Trafo 1 tahun
Gedung PPATK
Februari 2013
Pemeliharaan Engine Unit & Pompa Berikut Panel Power MBP ( 3 unit), BLP ( 3 unit), Genset TTB Jalur 1 & Depot ( 3 unit ), SBP ( 3 unit ), Lokasi Terminal BBM Balongan dan Booster Pump Cikampek ( 3 unit )
PT. Pertamina Upms III Balongan
Februari 2013
Rewinding Stator Genetator dan Pemasangann Heater StatorGenset 800 KVA No. 1.
PT. Pertamina Upms III Balongan
Maret 2013
Rewending Stator Motor Booster Pimp No. 3 ABB 150 kW
PT. Pertamina Upms III Balongan
Maret 2013
Development of RCM Plan
PT. Pakarti Tirto Agung
Maret 2013
Pengujian New Oil Pelumas
Maret 2013
Pengadaaan Check Valve 28” dan Gate Valve 28” Ansi 150
CV. Pembangkit Jaya Jambi Cv. Balongan Bumi Ayu Persada
Maret 2013
Pengadaan Gate Valve 2”, Gate Valve 8”
PT. Patra Teknik
Maret 2013
Pengadaan Gate Valve 2”
PT. Patra Teknik
PROJECT EXPERIENCES LIST April 2013
Pengadaan Butterfly Valve
April 2013
Pengadaan gate Valve 2” dan Check Valve 2”
PT. Anugrah Cahaya Engineering PT. Patra Teknik
Mei 2013
Pengadaan Power Longer
PT. Delta Samitra Utama
Mei 2013
Anual Service Engine Perkins 4006-800 kVA
Gedung Graha RSPP
Juli 2013
Pengadaan Globe Valve 4” dan Globe Valve 6”
PT. Patra Teknik
Juli 2013
Pengadaan Ball Valve 6”, Ball Valve 4”,Ball Valve 3”, Ball valve 2”,Globe Valve 4”,Globe Valve 2”, Globe Valve 1”, Globe Valve 1 ½”
PT. Patra Teknik
Juli 2013
Pengadaan Alat PDM Technology Ultrasonic
Juli 2013
Perawatan berkala Trafo dan kubikal (Semester I)
PT. PLN (Persero) Sektor Pembangkitan Cilegon PT. Pertamina Upms III Balongan
Juli 2013
Penggantian Bearing Pulley Fan Radiator MBP PT. Pertamina Upms III No. 2 Balongan
Agustus 2013
Overhaul Gearbox BLP No. 1 Flender H1SH50
Agustus 2013
Pemeliharaan Engine Unit & Pompa Berikut Panel Pompa MBP (3 Unit), BLP (3 Unit), Genset TTB jalur 1 & Depot (3 Unit), SBP (3 Unit)
Agustus 2013
Penggantian Spapepart Pompa Jalur I dan Genset
PT. Pertamina Upms III Balongan PT. Pertamina Upms III Balongan
PT. Pertamina Upms III Balongan
Agustus 2013
Perbaikan Radiator dan dan penggantian materai engine MBP No. 2Cat 3514
PT. Pertamina Upms III Balongan
Agustus 2013
Penggantian Sparepart Engine Main Booster Pomp No.2 Cat 3512
PT. Pertamina Upms III Balongan
PROJECT EXPERIENCES LIST Agustus 2013
Overhaul Unit Engine Main Booster No. 2, Cat PT. Pertamina Upms III 3512, Kap. 1355HP .SN Balongan
September 2013
Pengadaan Jasa Pengujian Oli Transformer (DGA Test)
September 2013
Repair Screen Wash Pump 1B, Merk : Ingersol PT. PJB (Persero) Desseer, Model : 12JKH-3, Head : 49 M, Flow Pembangkitan Muara : 120 m3/h. MotorDrive 30 kWn1450 Rpm Karang
September 2013
Pengadaan Globe Valve 4” dan Globe Valve 6”
PT. Patra Teknik
September 2013
Pengadaan Gate Valve 2”
PT. Patra Teknik
Oktober 2013
Pemasangan Panel ATS dan Syncron 2 (Dua) Unit Genset 800 KVA dan Engine Cikampek Booster Pump
PT. Pertamina Upms III Balongan
Oktober 2013
Pekerjaan Jasa Predictive Maintenance Transformer
PT. PLN (Persero) Sektor Pembangkitan Bandar Lampung PT. Purnapenas Agung
November 2013
Februari 2014
Pengadaan Gate Valve 20” Ansi 150 Manual Gear Box, Merk Crane
PT. PLN (Persero) Sektor Pembangkitan Bengkulu
Supply Of RCM Engineer
PT. Skefindo Primatama
Maret 2014
Jasa Training Analisa Vibrasi On Site Bagi Pemula
Maret 2014
Pemeliharaan Engit Unit dan Pompa BLP Periode Jan – Des 2014
PT. PLN (Persero) Sektor Pembangkitan Bandar Lampung PT. Pertamina Upms III Balongan
Maret 2014
Pemeliharaan Engine Unit & Pomp Berikut Panel Power MBP (3 Unit) Genset TTB Jalur 1 & Depot (3 Unit), SBP (3 Unit)Lokasi Terminal BBM Balongan dan Booster Pump Cikampek (3 Unit)Periode Jan – Jun 2014
PT. Pertamina Upms III Balongan
PROJECT EXPERIENCES LIST April 2014
Pengadaan Globe Valve , Carbon Steel, Class 150, DN 50MM, PN 4 MPA, 425°C, Flange (Crane USA)
PT. PJB UBJOM Indramayu
April 2014
Pengadaan Check Valve, 425℃, DN 100MM, Butt Weld, 2500 (Crane USA)
PT. PJB UBJOM Indramayu
April 2014
Pengadaan Globe Valve, F22, Class 2500, 425℃, Butt Weld, DN 40MM, PN 32 MPA
PT. PJB UBJOM Indramayu
April 2014
Pengadaan Engine Perkins Type 403D-11G, generator Stamford (PI004E/PI004F)
PT. Kuala Gruentech Energia
Juni 2014
Pengadaan Check, Duo Check Dual Plate, Size 12 Ansi 125#
PT. Sentratek International
Juni 2014
Perbaikan Cylinder Head Genset Perkins 3012 PT. Pertamina Upms III 800 KVA Balongan
Juni 2014
Minor Overhaul Genset Perkins 800 Kva No. 1 PT. Pertamina Upms III Balongan
CONTACT US PT. ADIKARI WISESA INDONESIA Komplek Rukan Sentra Pemuda. Jl. Pemuda No. 61 Kavling 19, Jakarta 13220 Phone : +62-21-4786 4302 Fax : +62-21-4786 5069 www.extreme-maintenance.com