DAFTAR PUSTAKA Abdullah, Fawaz. 2003. Lean Manufacturing Tools and Techniques in The Process Industry with a Focus on Steel. Dissertation of Department of Industrial Engineering, University of Pittsburgh. Alex, S., Lokesh, C. A.,and Ravikumar, N. 2010. Space utilization improvement in CNC machining unit through lean layout. Sastech Journal, 9(2). Anvar, M. M., & Irannejad, P. P. 2010. Value stream mapping in chemical processes: A case study in Akzonobel Surface Chemistry, Stenungsud, Sweden. Proceedings of the Lean Advancement Initiative, Daytona Beach, Florida. Assauri S.2008. Manajemen Produksi dan Operasi. Jakarta: Lembaga Penerbit Fakultas Ekonomi Universitas Mercu Buana Batubara. S., dan Kudsiah. F. 2011. Penerapan Konsep Lean Manufacturing Untuk Meningkatkan Kapasitas Produksi (Studi Kasus : Lantai Produksi Pt.Tata Bros Sejahtera. Jurnal Teknk Industri : Universitas Trisakti. Bhat, R., & Shivakumar, S., 2011. Improving the productivity using value stream mapping and kanban approach. International Journal of Scientific & Engineering Research, 2(8), 2229-5518. Chen, L., & Meng, B. 2010. The application of value stream mapping based lean production system. International Journal of Business and Management,5(6) Erfan, M. O. 2010. Application of lean manufacturing to improve the performance of health care sector in Libya. International Journal of Engineering & Technology, 10(06), 101706-6868. Fardiansyah. I. Iridiastadi. H. 2013.” Identifikasi Dan Usulan Pengurangan Pemborosan Pada Proses Pembuatan Sandal”. Jakarta. Program Studi Magister Teknik Industri, Universitas Mercu Buana Jakarta Goriwondo, M. W., & Maunga, N. 2012. Lean six sigma application for sustainable production : A case study for margarine production in Zimbabwe. International Journal Innovative Technology and Exploring Engineering, 1 (5), 2278-3075. Ginting R.2007. Sistem Produksi. Yogyakarta: Graha Ilmu Gitosudarmono, Indriyo. 2000. Manajemen Pemasaran. Edisi II,Yogyakarta: BPFE Yogyakarta. Joochim. O., and Jungthawan. S. 2015. An Application of Value Stream Mapping in Ceramic Tile Industry A Case Study. Bangkok. Institute of Field Robotics, King Mongkut’s University of Technology Thonburi, Thailand Kadam, J. S., Shende, N., & Kamble, D. P. 2012. Value stream mapping tool for waste identification in tyre-rim assembly of tractor manufacturing. International Confrence on Emerging Frontiers in Technology for Rural Area, Nagpur, India : Yeshwantro chavan College. Liker, K. J., & Meier, D. 2006. The toyota way fieldbook a practical guide for implementing toyota’s 4Ps. New york : Mc Graw-Hill Nash, Mark A & Poling, Sheila. 2008. Mapping The Total Value Stream. A Productivity Press Book, New York. Prayogo. T., dan Octavia. T. 2013. “Identifikasi Waste dengan Menggunakan Value Stream Mapping di Gudang PT. XYZ”. Jurnal Titra, Vol. 1, No. 2, 119–126 Rother, M., & Shook, J. 2004. Learning to see : Value Stream mapping to create value and eliminate muda version 1.4. Cambridge : Lean Enterprise Institute.
81 http://digilib.mercubuana.ac.id/
Sakkung, C.V & Sinuraya, C.2011. Studi Kasus PT Indoto Tirta Mulia.“Perbandingan Metode EOQ (Economic Order Quantity) dan JIT (Just in Time) Terhadap Efisiensi Biaya Persediaan dan Kinerja Non-Keuangan. Akurat Jurnal Ilmiah Akuntansi. No. 5 Singh, G., Belokar, M. R., 2012. Lean manufacturing implementation in the assembly shop of tractor manufacturing company. International Journal Innovative Technology and Exploring Engineering,1(2), 2278-3075. Sun, S. 2011. The strategic role of lean production in SOE’s Development. The Seven Waste be lean by identifying non value added activities. Isixsigma Magazine. International Journal of Business and Management, 6(2), 1833-3850. Sutalaksana, Iftikar Z. dkk.. 2006. Teknik Perancangan Sistem Kerja Edisi Kedua. Bandung: Penerbit ITB. Sutalaksana I.Z, dkk.1979. Teknik Tata Cara Kerja. Bandung: Institut Teknologi Bandung. Womack, Jim dan Jones. (2002). Seeing The Whole Mapping The Extended Value Stream. Brookline, Massachusetts, USA.
82 http://digilib.mercubuana.ac.id/
LAMPIRAN
http://digilib.mercubuana.ac.id/
NO
MATERIAL NAME
UOM
KODE STOCK
OPENING STOCK
FILLING MATERIAL MOVEMENT 1
STAND POUCH @ 1000 ML 270 X 160 X 44 MM FORTUNE
PC
058.251.010
1.984.500 (Pcs)
2
CARTON CO-FORTUNE P-1LT
SHT
083.002.233
70.871 (box)
OPENING
PRODUCT DESCRIPTION CO – FORTUNE 1LT X 12 POUCH
CODE 7.10100203020502
http://digilib.mercubuana.ac.id/
STOCK (Box) 327
Equipment
Spesification
FILLING
Brand
: Thimmonier
36 pcs/min ( pouch 2 Liter)
Type
: THD 800 MONO
37 pcs/min (pouch 1 Liter)
MACHINE FOR POUCH
Actual
Mini pouch size: 100 x 100 mm Maxi pouch size : 220 x 350 mm Maxi mechanical speed: 55 cycles per minutes Approx. Production capacity : 30 to 38 pouches per minutes Dimension (L x W) : 2350 x 1850 mm
Case erector
Weight
: 1570 kg
Brand
: PSS
Type
: ELVS 11-3
3 sec/pcs (carton 1 liter)
Machine size : 2700mm (L) x 2200(W) x 1700(H) Weight
: 400 kg
http://digilib.mercubuana.ac.id/
Maxi mechanical speed : 15 cartons/ minute System Control : PLC Logic Feature
: Quick and easy
Size adjustment for magazine width Malfunctioning alarm
Equipment
Spesification
WEIGHT
Brand
: PSS
Type
: Excel 30
CHECKER (INSPECTION)
Actual 3 sec/box (carton 1 liter)
Case size max : 420mm (L) x 320mm (W) x300mm (H) Max case weight : 1 – 30 kg Drive motor : Standard three phase current motor Rezero
: auto and manual
Reject system : optional Accuracy : +/- 20 g Aprox. Production capacity
: 20 case/minutes
Weight
:-
http://digilib.mercubuana.ac.id/
Case Sealer
Robotic Palletizer
Brand
: PSS
Type
: PSS-22-2
Speed
: 23 meters/minute
Dimension
: 1955 mm x 890mm x 1700mm
Brand
: PSS
481 sec/pallet
Type
: IRB 660/180
8.1 sec/box
Dimension
: 2300 x 987 mm
Weight
: 180 kg
http://digilib.mercubuana.ac.id/
4 sec/box (carton 1 liter)