9/12/2017
Waste to Energy Investment Presented on Waste to Energy National Conference Director for Infrastructure Planning
Jakarta, 12 September 2017 © Badan Koordinasi Penanaman Modal, 2017
Return of Investment on Waste to Energy Projects
Local Government
Waste Management
Power Production
Tipping Fee
Power Price
PLN
Waste to Energy Project
Benchmark: Waste volume Power capacity Power price Tipping fee
: 1.000 tons per day, : 12 – 16 MW, : 18,77 cent per kWh, : Rp 432.000 per tons of waste
The Investment Coordinating Board of the Republic of Indonesia
2
1
9/12/2017
Waste to Energy Projects Opportunities
8
Energy Infrastructure Waste to Energy Projects Waste to Energy in Large Cities
National Strategic Projects
(Jakarta, Tangerang, Bandung, Semarang, Surakarta, Surabaya, Denpasar, Makassar)
Located in Province of DKI Jakarta, Banten, West Java, Central Java, East Java, Bali and South Sulawesi Based on Presidential Regulation Number 58 Year 2017 regarding Amendment of Presidential Regulation Number 3 Year 2016 on the Acceleration of National Strategic Projects
9 Projects in RUPTL PLN
No. 1
Location South Sumatera
Project Name Sukawinatan Palembang
Capacity (MW) 0.5
Status Plan
2
DKI Jakarta
-
85
Plan
3
Banten
-
15
Plan
4
West Java
-
10
Plan
5
Central Java
-
15
Plan
6
Central Java
-
5
Plan Procurement
7
East Java
-
10
8
Bali
-
15
Plan
9
South Sulawesi
10.00
Plan
Makassar
Based on RUPTL PLN 2017-2026
The Investment Coordinating Board of the Republic of Indonesia
3
Investment on Waste to Energy Projects Principal License on Waste to Energy Projects in 2012-2017 by Number of Projects Investment value: Rp 642 billion ~US$ 47.5 million
by Country of Origin
PMDN, 1
Indonesia, 1 Various Countries, 1
PMA, 12
United Arab Emirates, 1 Malaysia, 2
Hongkong, RRT, 6
Singapore, 2
Investment value: Rp 47.6 trillion ~US$ 3.5 billion
Investment Realization* on Waste to Energy Projects in 2012-2017 by Number of Projects
by Country of Origin Indonesia, 1
Investment value: Rp 68.2 billion ~US$ 5.0 million
PMDN, 1 Hongkong, RRT, 1
PMA, 7
* Based on LKPM
Investment value: Rp 122,7 billion ~US$ 8.9 million
Singapore, 6
The Investment Coordinating Board of the Republic of Indonesia
4
2
9/12/2017
Improvement of Investment Climate
Foreign Capital Ownership for Waste to Energy Project Sector
Maximum Foreign Capital Ownership < 1 MW
Power Plant
Closed for Foreign Investor
1 – 10 MW
49 %
> 10 MW
95 % (for non PPP scheme) or 100% (for PPP scheme during concession period)
Power Transmission
95 % (for non PPP scheme) or 100% (for PPP scheme during concession period)
Power Distribution
95 % (for non PPP scheme) or 100% (for PPP scheme during concession period) 95%
Power Installation Consultation
95% (for power plant), 49% (for power transmission), Closed for Foreign Investor (for power distribution)
Construction and Installation of Electric Power
95%
Operation and Maintenance of Electric power Installation Examination and Testing of Electric Power Installation
49% (for power plant and power transmission), Closed for Foreign Investor (for power distribution)
Source: Presidential Regulation Number 44 Year 2016 The Investment Coordinating Board of the Republic of Indonesia
5
Priority Investment Service
3-hour Service
8+1 documents obtained
Available for investors with minimum (new or expansion project) investment of IDR 100 billion (USD 8 million) and/or employing 1,000 local workers. Or supplier of the existing manufacturing company with minimum investment of IDR 100 billion (USD 8 million) and/or employing 1,000 local workers. • Except for investment in infrastructure sector, including oil & gas and electricity • In accordance to MEMR Regulation No. 13/2017, 3 sectors have been determined to receive 3 hour licensing service
Certainty to start a business
• Investment license • Certificate of incorporation • NPWP / Tax registration • TDP / Company registration
Certainty to work
•RPTKA / Employment plan •IMTA / Working permit
Certainty to import capital goods
• APIP / Import identification • NIK / Customs registration
Accurate land Information
• Letter of land availability
BKPM
• Arrive at One-stop Integrated Service at BKPM directly from the airport. • Consult with Director of Investment Service. • Submit the required documents & data.
Wait at the lounge while documents are processed by BKPM, in-house notary, ministries, & other government institutions.
Obtain eight documents & letter of land availability within three hours to start your business.
The Investment Coordinating Board of the Republic of Indonesia
6
3
9/12/2017
3 HOURS INVESMENTLICENSING SERVICE FOR ENERGYAND MINERALRESOURCESSECTOR RECEIVE Requested licensing products
BKPM
9 Type of Licensing Issued by ESDM3J service
WAITING In Priority Lounge • Director ARRIVES at Central OSS. • SUBMIT required documents.
• •
NO
TYPE OF SERVICES
REGULAR SERVICE
1.
Temporary Business License for Electricity
2.
Temporary Business License for Oil / Fuel / LPG Storage
REQUIREMENTS
3.
ESDM3J service is given if the company has fulfiiled the checklist of administrative and technical requirements as regulated on MEMR Ministrial Decree No. 15 of 2016 as revised in Ministrial Decree No. 13 of 2017.
Temporary Business License for Storage of Processed Products / CNG
4.
Temporary Business License for LNG Storage
32 Working Days
5.
Temporary Business License for Oil Refinery
32 Working Days
6.
Temporary Business License for Processing Oil Residue Industry
32 Working Days
OSS : One Stop Service (PTSP) MEMR : Minister of Energi and Mineral Resources
20 Working Days 32 Working Days 32 Working Days for Processed Products --------40 Working days for CNG
7.
Temporary Business License for Natural Gas Processing
32 Working Days
8.
Temporary Business License for General Trade of Oil/Fuel
40 Working Days
9.
Temporary Business License for General Trade of Processed Products
40 Working Days
The Investment Coordinating Board of the Republic of Indonesia
7
Incentives IMPORT DUTY FACILITY PMK No.176/PMK.011/2009 jo. PMK No. 76/PMK.011/2012 jo. PMK 188/PMK.010/2015
Import duty on Machineries and Equipments, goods, and raw materials for production
• Exemption of import duty on machineries and equipments • 2 years exemption of import duty on raw materials • Additional 2 years import duty exemption for raw materials if company using locally-produced machineries and equipments (min 30%)
CUSTOMS CLEARANCE
Import Facility for Capital Goods
Four customs checking status: •Red line is for new companies. Physical & document checks before transported from ports.
Acceleration and certainty in custom clearance process
•Yellow line
Document check before goods transported from ports.
•Green line
Document check after goods transported from ports. •Main Partner Priority for companies with proven track record. No checking required.
Faster & Certain
•Capital goods do not require screening. •Cutting the processing time from 3-5 days to only 30 minutes.
Simple requirements PMK No. 66/PMK.010/2015
Import duty on Capital Goods for Development and Expansion of Power Generation Industries for Public Purpose.
New Facility:
Status upgrade from red to green line for new companies under construction
• Projects under construction • Obliged in reporting quarterly investment activities (LKPM) • Recommendation from BKPM
The Investment Coordinating Board of the Republic of Indonesia
8
4
9/12/2017
Thank You Terima Kasih
Indonesia Investment Promotion Centre (IIPC)
Badan Koordinasi Penanaman Modal (BKPM) Indonesia Investment Coordinating Board Jln. Jend. Gatot Subroto No. 44 Jakarta 12190 - Indonesia t . +62 21 525 2008 f . +62 21 525 4945 e .
[email protected] PTSP Pusat Contact Center: 0807-100-BKPM (2576)
www.bkpm.go.id The Investment Coordinating Board of the Republic of Indonesia
9
Improvement of Investment Service
One
place
All
22 ministries integrated
3-hour
sectors 167 permits are delegated to BKPM
Service
One-Stop Services
One-Stop
Service Industry,
(PTSP) at BKPM
power,
Direct
oil & gas,
Construction
tourism at one place
91% Regional PTSP formed. 61% regional PTSP implement e-licensing.
5
9/12/2017
Incentives TAX ALLOWANCE PP No. 9/2016 jo PP No. 18/2015
30
% of investmentvalue Reduction of corporate net income tax for 6 years, 5% each year.
145
business segments Eligible for tax
allowance, expanded from 129 segments in the previous regulation.
Under certain
requirements among others: investment value or export orientation, manpower absorption, local content.
PEMBEBASAN PAJAK PENGHASILAN (TAX HOLIDAY)
IMPORT DUTY FACILITY
PMK No.159/PMK.010/2015
PMK No.176/PMK.011/2009 jo. PMK No. 76/PMK.011/2012 jo. PMK 188/PMK.010/2015
5-15years
Import duty on Machineries and Equipments, goods, and raw materials for production
IDR
• Exemption of import duty on machineries and equipments • 2 years exemption of import duty on raw materials • Additional 2 years import duty exemption for raw materials if company using locally-produced machineries and equipments (min 30%)
1
Tax relief facility, starting from the commencement of commercial production. Can be extended for Max. 20 years under certain consideration.
trillion Minimum investment plan (USD 80 million). Or Minimum IDR 500 Billion if introduce new technology
Max.100% 10-100% Reduction of corporate income tax for Pioneer Industry. Max. 50% for industry that implement high technology with investment plan IDR 500 M – less than 1 Trillion.
Pioneer Industry 1. 2. 3. 4.
PMK No. 66/PMK.010/2015
5.
Import duty on Capital Goods for Development and Expansion of Power Generation Industries for Public Purpose.
6. 7. 8.
Upstream metal; Oil refinery; Basic organic-chemical from oil and gas; Machinery industry that manufacture industrial machine; Processing industry based on commodity from agriculture, forestry and fishery; Telecommunication, information and communication; Sea transport; Processing industry as main industry located in Special Economic Zone (SEZ); and or
9.Infrastructure (economical, nonPPP scheme)
The Investment Coordinating Board of the Republic of Indonesia
11
Incentives IMPORT DUTY FACILITY
TAX HOLIDAY PMK No.159/PMK.010/2015
PMK No.176/PMK.011/2009 jo. PMK No. 76/PMK.011/2012 jo. PMK 188/PMK.010/2015
5-15years
Tax relief facility, starting from the commencement of commercial production. Can be extended for Max. 20 years under certain consideration.
Import duty on Machineries and Equipments, goods, and raw materials for production
• Exemption of import duty on machineries and equipments • 2 years exemption of import duty on raw materials • Additional 2 years import duty exemption for raw materials if company using locally-produced machineries and equipments (min 30%) PMK No. 66/PMK.010/2015
Import duty on Capital Goods for Development and Expansion of Power Generation Industries for Public Purpose.
IDR
1
trillion Minimum investment plan (USD 80 million). Or Minimum IDR 500 Billion if introduce new technology
Max.100% 10-100% Reduction of corporate income tax for Pioneer Industry. Max. 50% for industry that implement high technology with investment plan IDR 500 M – less than 1 Trillion.
Pioneer Industry 1. 2. 3. 4. 5.
Upstream metal; Oil refinery; Basic organic-chemical from oil and gas; Machinery industry that manufacture industrial machine; Processing industry based on commodity from agriculture, forestry and fishery; 6. Telecommunication, information and communication; 7. Sea transport; 8. Processing industry as main industry located in Special Economic Zone (SEZ); and or
9.Infrastructure (economical, non-PPP scheme) The Investment Coordinating Board of the Republic of Indonesia
12
6
9/12/2017
Improvement of Investment Climate
CUSTOMS CLEARANCE Four customs checking status: •Red line is for new companies. Physical & document checks before transported from ports.
•Yellow line
Document check before goods transported from ports.
•Green line
Document check after goods transported from ports. •Main Partner Priority for companies with proven track record. No checking required. New Facility:
Status upgrade
Import Facility for Capital Goods Acceleration and certainty in custom clearance process Faster & Certain
•Capital goods do not require screening. •Cutting the processing time from 35 days to only 30 minutes. Simple requirements
• Projects under construction • Obliged in reporting quarterly investment activities (LKPM) • Recommendation from BKPM
from red to green line for new companies under construction The Investment Coordinating Board of the Republic of Indonesia
13
Issues on Waste to Energy Projects
Tipping Fee Deskripsi Pengembalian investasi untuk proyek pembangkit listrik berbasis sampah (PLTSa) harus didukung oleh pendapatan dari biaya pengelolaan sampah (Tipping Fee) dari Pemkab/kota terkait. Namun sebagian besar Pemerintah Kota tidak dapat memenuhi kewajibannya menyediakan anggaran tipping fee yang layak. Usulan Solusi Penetapan kembali harga pembelian listrik khusus untuk PLTSa sesuai dengan Permen ESDM No 44 Tahun 2015. Diharapkan dengan harga listrik yang lebih baik walaupun Tipping Fee yang kurang dari target, sehingga investasi proyek PLTSa tetap menarik.
Power Price Deskripsi Harga pembelian tenaga listrik untuk PLTSa di luar 8 provinsi/kota masih tergolong rendah sehingga tidak menarik minat investasi. Usulan Solusi 1) Menaikkan harga pembelian tenaga listrik sesuai dengan kelayakannya 2) Meningkatkan dukungan pemerintah dalam bentuk insentif
The Investment Coordinating Board of the Republic of Indonesia
14
7
9/12/2017
Lampiran I PP 9/2016 Tax Allowance – Bidang Usaha Tertentu (1/2) KBLI Tahun 2009 Cetakan III
Bidang Usaha
Cakupan Produk
Persyaratan
PERTAMBANGAN BATU BARA DAN LIGNIT Gasifikasi batubara di lokasi penambangan
05102
Coal gasification.
Hanya untuk memenuhi kebutuhan dalam negeri.
Pengusahaan tenaga panas bumi
06202
Industri pemurnian dan pengilangan minyak bumi
19211
Pemurnian pengilangan minyak bumi yang menghasilkan gas/LPG, avtur, avigas, naphtha, minyak solar, minyak tanah atau kerosin, minyak diesel, minyak bakar atau bensin, lubricant, waz, solvent/pelarut, residu dan aspal.
Industri pemurnian dan pengolahan gas alam
19212
Kelompok ini mencakup usaha pemurnian dan pengolahan gas bumi menjadi Liquified Natural Gas (LNG) dan Liquified Petroleum Gas (LPG).
Industri pembuatan minyak pelumas
19213
Semua cakupan produk yang termasuk dalam KBLI ini.
Industri kimia dasar organik yang bersumber dari minyak bumi, gas alam, dan batubara
20117
PERTAMBANGAN MINYAK BUMI DAN GAS ALAM DAN PANAS BUMI - Pencarian - Pengeboran - Pengubahan tenaga panas bumi menjadi tenaga listrik. INDUSTRI PRODUK DARI BATU BARA DAN PENGILANGAN MINYAK BUMI Prioritas untuk memenuhi kebutuhan dalam negeri.
INDUSTRI BAHAN KIMIA DAN BARANG DARI BAHAN KIMIA - Hulu kelompok olefin: ethylene, propylene, crylic acid, butadien, buthane, butene-I, Ethyl Tert Butyl Ether, ethylene dichloride, vinyl chloride monomer, raffinate, pyrolisis gasoline, crude C-4. - Hulu kelompok aromatik: purified terephthalic acid (PTA), paraxylene, benzene, toluene, orthoxylene. - Hulu berbasis synthesis gas: methanol, ammonia. - Lainnya: carbon black IndonesiaInvestment Coordinating Board
15
Lampiran I PP 9/2016 Tax Allowance – Bidang Usaha Tertentu (2/2) Bidang Usaha
KBLI Tahun 2009 Cetakan III
Cakupan Produk
Persyaratan
INDUSTRI PERALATAN LISTRIK Industri pengubah tegangan (transformator), pengubah arus (rectifier) dan pengontrol tegangan (voltage stabilizer)
27113
Industri transformator di atas 500 (lima ratus) kV.
Melakukan alih teknologi.
INDUSTRI MESIN DAN PERLENGKAPAN YTDL (Yang Tidak Dapat Diklasifikasikan di Tempat Lain) Industri mesin uap, turbin, dan kincir
28111
Industri turbin uap, turbin gas.
PENGADAAN LISTRIK, GAS, UAP/AIR PANAS DAN UDARA DINGIN Pembangkitan tenaga listrik
35101
Pengubahan tenaga energi baru (hidrogen, CBM, batubara tercairkan atau batubara tergaskan) dan energi terbarukan (tenaga air dan terjunan air, tenaga surya, angin atau arus laut) menjadi tenaga listrik.
Pengadaan gas alam dan buatan
35201
- Regasifikasi LNG menjadi gas dengan menggunakan Floating Storage Regasification Unit (FSRU). - Coalbed Methana (Non PSC)gas metana batubara, shale gas, tight gas sand dan methane hydrate.
IndonesiaInvestment Coordinating Board
16
8
9/12/2017
Lampiran I PP 9/2016 Tax Allowance – Bidang Usaha Tertentu dan Daerah Tertentu Bidang Usaha
KBLI Tahun 2009 Cetakan III
Cakupan Produk
Daerah/Provinsi
Persyaratan
PERTAMBANGAN BATU BARA DAN LIGNIT Pertambangan Batubara
05101
Pemanfaatan batubara untuk energi liquifaction.
Pengelolaan dan Pembuangan Sampah yang Tidak Berbahaya
38211
Listrik, uap, bahan bakar substitusi, dan/atau biogas, yang dihasilkan dari pengolahan limbah organik (Sludge dan POME (Palm Oil Mill Effluent) pabrik kelapa sawit.
Kalimantan Selatan, Kalimantan Timur, Kalimantan Utara, Kalimantan Tengah, Jambi, Bengkulu, Sumatera Selatan, Sumatera Barat, Riau, Aceh.
PENGELOLAAN LIMBAH Jakarta, Jawa Barat, Banten, Jawa Tengah, DI Yogyakarta, Jawa Timur (tidak termasuk Kabupaten di Pulau Madura), Sulawesi Utara, Sulawesi Barat, Sulawesi Tenggara, Sulawesi Tengah, Sulawesi Selatan, Gorontalo, Bali, Nusa Tenggara Barat, Nusa Tenggara Timur.
IndonesiaInvestment Coordinating Board
17
9