PREFACE (2nd edition September 2001) This second edition of the booklet is an effort to improve public access to information on the projects which the World Bank is supporting in Indonesia. It is intended to provide the reader with an easy-to-use, but comprehensive listing of the World Bank’s current project portfolio in Indonesia. By publishing this listing in both English and Bahasa Indonesia, we hope to increase readership – and enhance awareness of the work being undertaken with World Bank assistance. More detailed information on most of these projects – typically in the form of documents called Project Appraisal Documents (PAD) – is also available to the public. Along with a wide range of materials related to the World Bank, these additional project documents can be obtained from the Public th Information Center (PIC). The PIC is located in the Jakarta Stock Exchange Building, Tower II, 13 Floor, Jl. Jenderal Sudirman Kav. 52-53, Jakarta Pusat. (Telephone: 021-5299-3000). Our staff will be more than happy to assist you. I would also suggest you visit our web site at http://www.worldbank.or.id for more general information and a complete listing of World Bank publications. I hope this booklet will give you a better understanding about the World Bank and the work we do in Indonesia.
Mark Baird Country Director
KATA PENGANTAR (edisi kedua September 2001) Buku kecil edisi kedua ini merupakan suatu upaya untuk menambah akses publik terhadap informasi tentang proyek-proyek yang dibiayai oleh Bank Dunia di Indonesia. Buku ini diharapkan dapat menyediakan informasi kepada para pembaca tentang daftar proyek Bank Dunia yang sedang berjalan di Indonesia secara ringkas, mudah dibaca dan komprehensif. Dengan menerbitkan buku ini dalam bahasa Inggris dan bahasa Indonesia, kami berharap untuk meningkatkan jumlah pembaca--serta peningkatan pengetahuan tentang proyek-proyek yang dibiayai oleh pinjaman dari Bank Dunia. Informasi yang lebih rinci mengenai sebagian besar proyek-proyek ini--umumnya dalam bentuk berbagai dokumen yang disebut Dokumen Penilaian Proyek (PAD - Project Appraisal Document)--juga tersedia untuk umum. Dokumen Penilaian Proyek ini, bersama dengan berbagai jenis publikasi yang berkaitan dengan Bank Dunia, dapat diperoleh dari Pusat Informasi Publik (PIC - Public Information Center) kami. PIC ini terletak di Gedung Bursa Efek Jakarta (BEJ), Menara II, Lantai 13, Jl. Jendral Sudirman, Kav. 52-53, Jakarta Pusat. (Telepon: 021-5299-3000). Staf kami akan sangat senang untuk membantu anda. Saya juga ingin menyarankan anda untuk mengunjungi situs web kami di http://www.worldbank.or.id untuk mendapatkan lebih banyak informasi umum dan daftar lengkap publikasi Bank Dunia. Saya sangat berharap, buku ini akan memberikan pengertian yang lebih baik mengenai Bank Dunia dan program kami di Indonesia.
Mark Baird Country Director
HOW TO USE THIS DOCUMENT This document provides up to date information on projects currently being supported by the World Bank throughout Indonesia. It is intended to provide key data on each project. To understand the format in which the project information is presented, please refer to the following chart and the narrative descriptions of the entries for each project.
CARA MENGGUNAKAN DOKUMEN INI Dokumen ini menyediakan informasi terkini tentang proyek-proyek yang saat ini dibiayai oleh Bank Dunia di seluruh Indonesia. Buku ini dimaksudkan untuk menyediakan data penting mengenai setiap proyek. Untuk memahami format penyajian informasi proyek, silakan merujuk kepada bagan berikut dan uraiannya untuk masing-masing proyek. Areas of Coverage (Wilayah Proyek )
Project Data (Data Proyek)
12
Project Objectives (Tujuan Proyek)
14
Executing Agency (Institusi Pelaksana) 13 1.
Western Java Environment Management Project Loan 4612-IND/Credit 3519-IND/ TF-029805 Original Loan Amount: $11.7m Original Credit Amount: $5.8m. GEF Grant Amount: $2.5m. Canceled: $0 Net Commitment: $0 Approval Date: 06/01 Closing Date: 06/05 World Bank Contact in Jakarta: Suhadi Hadiwinoto
No. Pinjaman 4612-IND/ Kredit 3519-IND/TF-029805 Pagu Awal Pinjaman: $11.7 juta Pagu Awal Kredit: $5.8 juta Pagu Hibah GEF: $2.5 juta Dibatalkan: $0 Pagu Bersih: $0 Tanggal Persetujuan: Jun-01 Tanggal Akhir: June-05 Kontak di Bank Dunia, Jakarta: Suhadi Hadiwinoto
DKI Jakarta, Banten, W. Java 2
3 4 5 6 7 8 9 10 11
DKI Jakarta, Banten, Jabar
DG Urban and Rural Development, Ministry of Settlement and Regional Infrastructure
Ditjen Pengembangan Perkotaan dan Pedesaan, Departemen Permukiman dan Prasarana Wilayah
• To strengthen institutionally and economically the local, provincial and regional institutions responsible for waste management and environmental control. • To develop local environmental strategies and plans within the national strategy. • To increase community awareness and participation in environmental management both at the local government and community levels. • To improve waste collection and disposal as well as support activities directed at waste reduction, reuse and recycling. • To improve the environmental conditions of a number specific, high priority localities. • To assist in developing a commercial level composting industry through a grant from the Global Environmental Facility (GEF).
• Untuk meningkatkan secara institusi dan ekonomi, institusi daerah, propinsi dan regional yang bertanggung jawab untuk manajemen pembuangan dan pengendalian lingkungan. • Untuk meningkatkan strategi lingkungan daerah dan rencana dalam strategi nasional. • Untuk meningkatkan kesadaran masyarakat dan partisipasi dalam manajemen lingkungan, baik pemerintah daerah maupun tingkat masyarakat. • Untuk meningkatkan pengumpulan dan pembuangan sampah serta mendukung kegiatan yang ditujukan pada pengurangan sampah, penggunaan kembali dan daur ulang. • Untuk meningkatkan kondisi lingkungan dari beberapa daerah yang khusus dan berprioritas utama. • Untuk membantu dalam membangun tingkat komersial dari industri kompos melalui hibah dari Fasilitas Lingkungan Global (GEF).
1
1. Sector: This heading refers to the sector of activity of the project.
Sektor: Judul ini berhubungan dengan bidang/sektor kegiatan proyek. 2. Project Name: This is a short narrative title for identification purposes and typically describes the nature of the project.
Nama Proyek: Ini adalah judul uraian singkat untuk keperluan identifikasi nama proyek dan secara khas menguraikan kegiatan proyek ini. 3. Loan and Credit Number: This is an internal World Bank standardized code used for identification purposes. All Indonesian projects are identified with the letters “IND”.
Nomor Pinjaman dan Nomor Kredit: Ini adalah kode nomor standar internal Bank Dunia yang digunakan untuk keperluan identifikasi internal. Semua proyek Indonesia diidentifikasi dengan huruf akhir “IND”. 4. Original Loan Amount: This figures represents the amount of the loan, stated in millions of US dollars, as originally agreed in the loan between the Republic of Indonesia and the International Bank for Reconstruction and Development (for loan agreements).
Pagu Awal Pinjaman: Angka ini menunjukkan jumlah pinjaman, yang dinyatakan dalam jutaan dollar AS, sebagaimana yang telah disepakati di dalam perjanjian pinjaman antara Republik Indonesia dan Bank Internasional untuk Rekonstruksi dan Pembangunan (untuk perjanjian pinjaman). 5. Original Credit Amount: This figures represents the amount of the loan, stated in millions of US dollars equivalent, as originally agreed in the development credit agreement between the Republic of Indonesia and the International Development Association (IDA).
Pagu Awal Kredit: Angka ini menunjukkan jumlah pinjaman, yang dinyatakan setara dalam jutaan dollar AS, sebagaimana yang telah disepakati di dalam perjanjian kredit pembangunan antara Republik Indonesia dan Asosiasi Pembangunan Internasional (IDA). 6. GEF Grant Amount: This figures represents the amount of the grant, stated in millions of US dollars equivalent, as originally agreed in the grant agreement between the Republic of Indonesia and the International Bank for Reconstruction and Development acting as Implementing Agency of the Global Environment Facility (GEF).
Pagu Hibah GEF: Angka ini menunjukkan jumlah hibah, yang dinyatakan setara dalam jutaan dollar AS, sebagaimana yang telah disepakati di dalam perjanjian hibah antara Republik Indonesia dan Bank Internasional untuk Rekonstruksi dan Pembangunan selaku Institusi Pelaksana untuk Fasilitas Lingkungan Global (GEF). 7. Canceled: During regular portfolio reviews conducted jointly by the Government of Indonesia and the World Bank, portions of some loans may be canceled if they are no longer needed for the carrying out of project activities or if there are significant problems arising during project implementation. This figure shows the portion of the original loan amount that has been canceled.
Dibatalkan: Selama tinjauan portofolio yang dilakukan secara reguler bersama-sama oleh Pemerintah Indonesia dan Bank Dunia, sebagian dari jumlah pinjaman dapat dibatalkan bila tidak dibutuhkan lagi atau bila terdapat masalah-masalah signifikan yang timbul selama pelaksanaan proyek. Angka ini menunjukkan bagian dari jumlah pinjaman yang telah dibatalkan.
8. Net Commitment: This is the amount of funds (in millions of US dollars) that is available for disbursement under the project (i.e. the “original amount” less any “canceled amount”).
Pagu Bersih: Angka ini menunjukkan jumlah dana terakhir (dalam jutaan dollar AS) yang tersedia untuk proyek (yakni “pagu awal” dikurangi “jumlah yang dibatalkan”). 9. Approval Date: This shows the month and the year when the project was originally approved by the Executive Directors of the World Bank.
Tanggal Persetujuan: Ini menunjukkan bulan dan tahun ketika proyek disetujui oleh para Direktur Eksekutif Bank Dunia. 10. Closing Date: The date when the project is expected to be completed. The Government of Indonesia can propose an extension of the closing date. The extension is granted by the World Bank where justified, and then the closing date is revised.
Tanggal Akhir: Tanggal manakala proyek diharapkan akan selesai. Pemerintah Indonesia dapat mengusulkan pengunduran tanggal akhir proyek. Pengunduran akan disetujui oleh Bank Dunia apabila ada alasan yang membenarkannya dan kemudian tanggal akhir diubah. 11. World Bank Contact in Jakarta: This column identifies the contact person for the project at the World Bank Office in Jakarta.
Kontak di Bank Dunia, Jakarta: Kolom ini menyatakan orang yang dapat dihubungi mengenai proyek tersebut di Kantor Bank Dunia di Jakarta. 12. Areas of Coverage: This column provides the provincial coverage of the projects.
Wilayah Proyek: Kolom ini merinci cakupan proyek menurut propinsi. 13. Executing Agencies: This column identifies the agency within the Government of Indonesia that is responsible for the implementation/coordination of the project.
Institusi Pelaksana: Kolom ini mengidentifikasi nama instansi Pemerintah Indonesia yang bertanggung jawab terhadap pelaksanaan/koordinasi proyek tersebut. 14. Project Objectives: This column provides a brief narrative explanation of the major objectives of the project.
Tujuan Proyek: Kolom ini memberikan uraian singkat mengenai tujuan-tujuan utama proyek.
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
1.
(Tujuan Proyek)
Pelaksana)
Dam Safety Project Loan 3742-IND Original Loan Amount: $55m. Canceled: $19.8m. Net Commitment: $35.2m. Approval Date: 5/94 Closing Date: 09/02 World Bank Contact in Jakarta: Ilham Abla
No. Pinjaman 3742-IND Pagu Awal Pinjaman: $55 juta Dibatalkan: $19.8 juta Pagu Bersih: $35.2 juta Tanggal Persetujuan: Mei-94 Tanggal Akhir: Sep-02 Kontak di Bank Dunia, Jakarta: Ilham Abla 2.
Project Objectives
Proyek)
Lampung, Banten, W. Java, E. Java, Bali, West Nusa Tenggara
Lampung, Banten, Jabar, Jatim, Bali, NTB DG Water Resources, Ministry of Settlement and Regional Infrastructure
Ditjen Pengairan, Departemen Permukiman dan Prasarana Wilayah
• To reduce the risk of dam failures in Indonesia through the establishment of national dam safety institutions and carrying out a program to improve safety of existing dams.
• Untuk mengurangi resiko kerusakan bendungan di Indonesia melalui pembentukan instansi-instansi keamanan bendungan nasional dan melaksanakan suatu program untuk meningkatkan keamanan bendungan-bendungan yang ada.
Java Irrigation Improvement and Water Resources Management Project Loan 3762-IND Original Loan Amount: $165.7m. Canceled: $41.2m. Net Commitment: $124.5m. Approval Date: 6/94 Closing Date: 12/01 World Bank Contact in Jakarta: Ilham Abla
Banten, DI Yogyakarta, W. Java, C. Java, E. Java
Banten, DI Yogyakarta, Jabar, Jateng, Jatim DG Water Resources, Ministry of Settlement & Regional Infrastructure
Ditjen Pengairan, Departemen Permukiman dan Prasarana Wilayah
• To support the institutional reforms and river basin-focused operations which foster integrated water resources management in Java. • To maximize coverage of efficient operation and maintenance of irrigation schemes. • To expand the Irrigation Service Fee Program for cost recovery. • To privatize less than 500 ha irrigation schemes through turning them over to non-profit Water User Associations (WUAs). • To complete technically and economically viable rehabilitation of systems larger than 500 ha. • To improve operational aspects of the Dumpil Irrigation System.
Page 1 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
(Tujuan Proyek)
Pelaksana) • Mendukung berbagai reformasi kelembagaan dan berbagai operasi yang berfokus pada daerah aliran sungai, yang mendukung pembinaan dan pengelolaan sumber daya air secara terpadu di Jawa. • Memaksimalkan cakupan operasi dan pemeliharaan berbagai proyek irigasi yang lebih efisien. • Mengembangkan Program Biaya Pelayanan Irigasi untuk pemulihan biaya. • Melaksanakan privatisasi terhadap daerah-daerah irigasi yang luasnya di bawah 500 ha dengan mengalihkannya kepada Perkumpulan Petani Pemakai Air (P3A) nirlaba. • Menyelesaikan rehabilitasi yang layak teknik dan ekonomis daerahdaerah irigasi yang luasnya di atas 500 ha. • Mengembangkan aspek operasional Sistem Irigasi Dumpil.
No. Pinjaman 3762-IND Pagu Awal Pinjaman: $165,7 juta Dibatalkan: $41.2 juta Pagu Bersih: $124.5 juta Tanggal Persetujuan: Jun-94 Tanggal Akhir: Des-01 Kontak di Bank Dunia, Jakarta: Ilham Abla
3.
Project Objectives
Proyek)
Land Administration Project Loan 3792-IND Original Loan Amount: $80m. Canceled: $33.9m. Net Commitment: $46.1m. Approval Date: 9/94 Closing Date: 12/01 World Bank Contact in Jakarta: Sumaryo Soemardjo
No. Pinjaman 3792-IND Pagu Awal Pinjaman: $80 juta Dibatalkan: $33,9 juta Pagu Bersih: $46,1 juta Tanggal Persetujuan: Sep-94 Tanggal Akhir: Des-01 Kontak di Bank Dunia, Jakarta: Sumaryo Soemardjo
Riau, Jambi, Banten, W. Java, C. Java, E. Java, DI Yogyakarta, W. Kalimantan
Riau, Jambi, Banten, Jabar, Jateng, Jatim, DI Yogyakarta, Kalbar National Land Agency (BPN)
Badan Pertanahan Nasional (BPN)
• To foster efficient and equitable land markets through systematic registration in Java, improvement of the institutional framework for land administration, and long-term increase in Badan Pertanahan Nasional (BPN's) land administration capacity. • To support GOI's efforts to develop long-term land management policies through a package of studies, workshops and seminars.
• Membina pasar tanah yang lebih efisien dan adil serta mengurangi konflik sosial, melalui pendaftaran tanah yang sistematis, perbaikan kerangka kelembagaan administrasi tanah serta peningkatan yang berkelanjutan kemampuan pengelolaan tanah Badan Pertanahan Nasional (BPN). • Mendukung upaya-upaya Pemerintah untuk mengembangkan kebijakan-kebijakan pengelolaan tanah jangka panjang melalui studi, lokakarya dan seminar.
Page 2 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
4.
(Tujuan Proyek)
Pelaksana)
Nusa Tenggara Agricultural Area Development Project Loan 3984-IND Original Loan Amount: $27m. Canceled: $4.9m. Net Commitment: $22.1m. Approval Date: 3/96 Closing Date: 9/02 World Bank Contact in Jakarta: Maria Triyani
No. Pinjaman 3984-IND Pagu Awal Pinjaman: $27 juta Dibatalkan: $4,9 juta Pagu Bersih: $22,1 juta Tanggal Persetujuan: Mar-96 Tanggal Akhir: Sep-02 Kontak di Bank Dunia, Jakarta: Maria Triyani 5.
Project Objectives
Proyek)
E. Nusa Tenggara, W. Nusa Tenggara
NTT, NTB
DG Regional Development, Ministry of Home Affairs
• To promote equitable regional development by: (a) raising smallholder incomes in a sustainable manner; (b) strengthen local level institutions; and (c) foster broad-based participation at the grassroots level.
• Membina pengembangan daerah yang adil dengan: (a) menaikkan pendapatan petani yang memiliki ladang kecil dengan cara yang berkelanjutan; (b) memantapkan instansi-instansi tingkat lokal; dan (c) membina partisipasi yang berbasis luas pada tingkatan rakyat biasa.
Ditjen Bina Pembangunan Daerah, Departemen Dalam Negeri
Sulawesi Agricultural Area Development Project Loan 4007-IND Original Loan Amount: $26.8m. Canceled: $3.7m. Net Commitment: $23.1m. Approval Date: 4/96 Closing Date: 6/03 World Bank Contact in Jakarta: Maria Triyani
No. Pinjaman 4007-IND Pagu Awal Pinjaman: $26,8 juta Dibatalkan: $3,7 juta Pagu Bersih: $23,1 juta Tanggal Persetujuan: Apr-96 Tanggal Akhir: Jun-03 Kontak di Bank Dunia, Jakarta: Maria Triyani
• To promote environmentally sustainable farming practices. • To strengthen local institutions. • To foster beneficiary participation in planning and implementation.
C. Sulawesi, S.E. Sulawesi
Sulawesi Tengah, Sulawesi Tenggara
DG Regional Development, Ministry of Home Affairs
Ditjen Bina Pembangunan Daerah, Departemen Dalam Negeri
• Meningkatkan produktivitas dan pendapatan petani. • Membina praktek-praktek bertani yang berkelanjutan dan berwawasan lingkungan. • Meningkatkan kemampuan instansi-instansi lokal dalam perencanaan dan pelaksanaan program-program pengembangan pertanian.
Page 3 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
6.
7.
Project Objectives
Proyek)
(Tujuan Proyek)
Pelaksana)
Kerinci Seblat Integrated Conservation and Development Project Loan 4008-IND/TF.28312 Original Loan Amount: $19.1m. GEF Grant Amount: $4.4m. Canceled: $9.9m. Net Commitment: $9.2m. Approval Date: 4/96 Closing Date: 9/02 World Bank Contact in Jakarta: Titie Hadiyati
W. Sumatra, S. Sumatra, Jambi, Bengkulu, Bangka-Belitung
No. Pinjaman 4008-IND/ TF.28312 Pagu Awal Pinjaman: $19,1 juta Pagu Hibah GEF: $4.4 juta Dibatalkan: $9.9 juta Pagu Bersih: $9.2 juta Tanggal Persetujuan: Apr-96 Tanggal Akhir: Sep-02 Kontak di Bank Dunia, Jakarta: Titie Hadiyati
DG Regional Development, Ministry of Home Affairs
Sumbar, Sumsel, Jambi, Bengkulu, Bangka- Belitung
Ditjen Bina Pembangunan Daerah, Departemen Dalam Negeri
• To secure the biodiversity of the Kerinci Seblat National Park and stop further fragmentation by: (a) improving park protection and management with involvement of local communities; and (b) promoting sustainable management and the maintenance of permanent forest cover in the park bufferzone and concession areas.
• Melestarikan keanekaragaman hayati Taman Nasional Kerinci Seblat dan menghentikan kerusakan lebih jauh melalui: (a) peningkatan perlindungan dan pengelolaan taman dengan melibatkan masyarakat lokal; dan (b) meningkatkan pengelolaan yang berkelanjutan dan pemeliharaan tutupan hutan permanen di daerah konsesi dan penyangga taman.
Bengkulu Regional Development Project Loan 4290-IND Original Loan Amount: $20.5m. Canceled: $5m. Net Commitment: $15.5.m. Approval Date: 3/98 Closing Date: 8/04 World Bank Contact in Jakarta: Titie Hadiyati
No. Pinjaman 4290-IND Pagu Awal Pinjaman: $20,5 juta Dibatalkan: $5 juta Pagu Bersih: $15.5 juta Tanggal Persetujuan: Mar-98 Tanggal Akhir: Agt-04 Kontak di Bank Dunia, Jakarta: Titie Hadiyati
• To alleviate poverty and generate economic growth through rural development. • To improve the quality of life for rural families
Bengkulu
Bengkulu DG Regional Development, Ministry of Home Affairs
Ditjen Bina Pembangunan Daerah, Departemen Dalam Negeri
• Mengurangi kemiskinan dan membangkitkan pertumbuhan ekonomi melalui pengembangan pedesaan. • Meningkatkan kualitas hidup bagi keluarga-keluarga pedesaan.
Page 4 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
8.
Project Objectives
Proyek)
(Tujuan Proyek)
Pelaksana)
Coral Reef Rehabilitation and Management Project Loan 4305-IND/TF-028373 Original Loan Amount: $6.9m. GEF Grant Amount: $4.1m. Approval Date: 3/98 Closing Date: 10/02 (cofinanced by ADB, Australian Aid and JICA) World Bank Contact in Jakarta: Thomas Walton
Riau, S. Sulawesi, E. Nusa Tenggara, Irian Jaya
• To establish a viable framework for a national coral reef management system.
Riau, Sulsel, NTT, Irian Jaya
• Untuk membentuk suatu kerangka praktis bagi sistem pengelolaan rangkaian terumbu karang nasional.
The Indonesian Institute of Sciences (LIPI)
Lembaga Ilmu Pengetahuan Indonesia (LIPI)
No. Pinjaman 4305-IND/ TF-028373 Pagu Awal Pinjaman: $6,9 juta Pagu Hibah GEF: $4,1 juta Tanggal Persetujuan: Mar-98 Tanggal Akhir: Okt-02(juga dibiayai oleh ADB, Australian Aid dan JICA) Kontak di Bank Dunia, Jakarta: Thomas Walton 9.
Second Agricultural Research Management Project Loan 3886-IND Original Loan Amount: $63m. Canceled: $22.9m. Net Commitment: $40.1m. Approval Date: 5/95 Closing Date: 4/02 World Bank Contact in Jakarta: Sumaryo Soemardjo
DI Aceh, N. Sumatra, Riau, Jambi, Yogyakarta, Central Java, W. Kalimantan, N. Sulawesi, Gorontalo, C. Sulawesi, S. Sulawesi, S.E. Sulawesi, N. Maluku, Maluku, E. Nusa Tenggara, W. Nusa Tenggara
DI Aceh, Sumut, Riau, Jambi, Yogyakarta, Jateng, Kalbar, Sulut, Gorontalo, Sulteng, Sulsel, Sultra, Maluku Utara, Maluku, NTT, NTB
• To strengthen regional agricultural research and development, based on local human and natural resources, by collaboratively developing and transferring locationspecific technology which is market-oriented and clientdriven to support agribusiness and agro-industry development. The project is focused on the participation of farmers groups and building partnerships with local organizations such as NGOs, producers' organizations, private entrepreneurs and extension service providers.
Page 5 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
No. Pinjaman 3886-IND Pagu Awal Pinjaman: $63 juta Dibatalkan: $22.9 juta Pagu Bersih: $40.1 juta Tanggal Persetujuan: Mei-95 Tanggal Akhir: Apr-02 Kontak di Bank Dunia, Jakarta: Sumaryo Soemardjo
10.
Project Objectives
Proyek)
(Tujuan Proyek)
Pelaksana)
Agency for Agriculture Research and Development, Ministry of Agriculture
Badan Penelitian dan Pengembangan Pertanian, Departemen Pertanian
• Memantapkan penelitian dan pengembangan pertanian di daerah,
berdasarkan sumber daya alam dan sumber daya manusia lokal, melalui kerja sama pengembangan dan alih teknologi sesuai kebutuhan spesifik lokasi yang berorientasi pasar dan berdasarkan kebutuhan pelanggan untuk mendukung pengembangan agrobisnis dan agroindustri. Proyek ini berfokus pada partisipasi kelompok-kelompok petani dan membangun kemitraan dengan berbagai organisasi lokal seperti LSM, organisasi produsen, para pengusaha swasta dan para penyedia jasa penyuluhan (dinas-dinas).
Decentralized Agricultural and Forestry Extension Project Loan 4510-IND/Credit 3280-IND Original Loan Amount : $13m. Original Credit Amount: $5m. Approval Date: 8/99 Closing Date: 03/04 World Bank Contact in Jakarta: Titie Hadiyati
No. Pinjaman 4510-IND/ No. Credit 3280-IND Pagu Awal Pinjaman: $13 juta Pagu Awal Kredit: $5 juta Tanggal persetujuan: Agt.-99 Tanggal Akhir: Mar-04 Kontak di Bank Dunia, Jakarta: Titie Hadiyati
DI Aceh, N. Sumatra, C. Java, Yogyakarta, E. Nusa Tenggara, S. Kalimantan, N. Sulawesi, Gorontalo, S. Sulawesi, S.E. Sulawesi
DI Aceh, Sumut, Jatim, Yogyakarta, NTT, Kalsel, Sulut, Gorontalo, Sulteng, Sultra National Center for Agricultural Extension, Ministry of Agriculture and in collaboration with the National Center for Forestry and Estate Crops Extension, Ministry of Forestry and Estate Crops
Pusat Penyuluhan Pertanian Nasional, Departemen Pertanian, bekerja sama dengan Pusat Penyuluhan Kehutanan dan Perkebunan Nasional, Departemen Kehutanan dan Perkebunan
• Enhance farmers' capacity to participate in extension activities and in strengthening the capacity of the districtlevel integrated agricultural and forestry extension system which would promote economically feasible, environmentally sustainable, and socially acceptable farming practices and increased farmers income.
• Meningkatkan kemampuan petani untuk berpartisipasi dalam kegiatan penyuluhan dan memantapkan kemampuan sistem penyuluhan pertanian dan kehutanan terpadu tingkat kabupaten/kota yang akan memajukan praktek-praktek pertanian yang praktis secara ekonomis, dapat berkelanjutan dari sudut lingkungan hidup, dan yang dapat diterima secara sosial serta meningkatkan pendapatan petani.
Page 6 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
11.
12.
Project Objectives
Proyek)
(Tujuan Proyek)
Pelaksana)
Water Resources Sector Adjustment Loan Loan 4469-IND Original Loan Amount: $300m. Approval Date: 5/99 Closing Date: 12/01 World Bank Contact in Jakarta: Ilham Abla
National
No. Pinjaman 4469-IND Pagu Awal Pinjaman: $300 juta Tanggal Persetujuan: Mei-99 Tanggal Akhir: Des-01 Kontak di Bank Dunia, Jakarta: Ilham Abla
Ditjen Pengairan, Departemen Permukiman dan Prasarana Wilayah
Nasional DG Water Resources, Ministry of Settlement and Regional Infrastructure
• To improve the national institutional framework for water resources development and management. • To improve the organizational and financial framework for river basin management. • To improve regulatory institutions and implementation instruments for regional water quality management. • To improve irrigation management performance and fiscal sustainability through farmer organization empowerment for participatory irrigation management.
• Meningkatkan kerangka kelembagaan nasional untuk pengembangan dan pengelolaan sumber daya air. • Meningkatkan kerangka organisasi dan finansial untuk pengelolaan daerah aliran sungai. • Meningkatkan instansi-instansi pengaturan dan instrumen pelaksanaan untuk pengelolaan kualitas air di daerah. • Meningkatkan kinerja pengelolaan irigasi dan keberlanjutan fiskal melalui pemberdayaan organisasi petani untuk pengelolaan irigasi partisipatif.
GEF-Biodiversity Strategy and Action Plan GEF Grant TF023957 Original Grant Amount: $0.4m. Approval Date: 09/00 Closing Date: 01/02 World Bank Contact in Jakarta: Maria Triyani
National
Nasional
• To provide support for overall project management and coordination, in order to foster both effective project implementation and long-term institutional transformation; • To restore and develop the collections associated functions of the Botany and Zoology Divisions. • To design and establish a computerized database of specimen-based data for collections management, collection plans and development, and external use. • To strengthen the capacity to coordinate and foster collaborative biological research activities and client services.
Page 7 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
Hibah GEF TF023957 Pagu Awal Hibah: $0,4 juta Tanggal Persetujuan: 09/00 Tanggal Akhir: 01/02 Kontak di Bank Dunia, Jakarta: Maria Triyani
Project Objectives
Proyek)
(Tujuan Proyek)
Pelaksana)
National Development Planning Agency
Badan Perencanaan Pembangunan Nasional (Bappenas)
• Memberikan bantuan untuk seluruh koordinasi dan manajemen proyek guna meningkatkan effektivitas pelaksanaan proyek dan transformasi institusional jangka panjang. • Memperbaiki dan mengembangkan koleksi dikaitkan dengan fungsi dari Divisi Ilmu Tumbuh-tumbuhan dan Ilmu Hewan. • Merancang dan membangun database dengan teknologi komputer berdasarkan contoh untuk manajemen koleksi, perencanaan dan pengembangan koleksi dan penggunaan keluar. • Meningkatkan kapasitas untuk mengkoordinasi dan memperkokoh kegiatan penelitian biologi yang berkolaborasi dan pelayanan pelanggan.
Page 8 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
13.
14.
Project Objectives
Proyek)
(Tujuan Proyek)
Pelaksana)
Second Professional Human Development Project Loan 3825-IND Original Loan Amount: $69m. Canceled: $12m. Net Commitment: $57m. Approval Date: 12/94 Closing Date: 10/01 World Bank contact in Jakarta: Jerry Strudwick
All provinces
No. Pinjaman 3825-IND Pagu Awal Pinjaman: $69 juta Dibatalkan: $12 juta Pagu Bersih: $57 juta Tanggal Persetujuan: Des-94 Tanggal Akhir: Okt-01 Kontak di Bank Dunia, Jakarta: Jerry Strudwick
Badan Perencanaan Pembangunan Nasional (Bappenas), Badan Pengkajian dan Penerapan Teknologi (BPPT), Badan Pendidikan dan Latihan Kepegawaian (BPLK), Departemen Keuangan
Semua propinsi National Development Planning Agency, Agency for the Assessment and Application of Technology, Education and Training Agency, Ministry of Finance
• To foster economic development and industrialization and facilitate policies of deregulation and decentralization by upgrading the quality of professional, managerial, and science and technology staff in key government ministries and agencies both at local and national levels.
• Untuk mendukung pertumbuhan ekonomi dan industrialisasi serta pelaksanaan otonomi daerah melalui pengembangan staf profesional, manajerial dan ilmuwan di berbagai instansi pemerintah pusat dan daerah.
Book and Reading Development Project Loan 3887-IND Original Loan Amount: $132.5m. Canceled: $36.5m. Net Commitment: $96m. Approval Date: 5/95 Closing Date: 12/01 World Bank contact in Jakarta: Jerry Strudwick
No. Pinjaman 3887-IND Pagu Awal Pinjaman: $132,5 juta Dibatalkan: $36,5 juta Pagu Bersih: $96 juta Tanggal Persetujuan: Mei-95 Tanggal Akhir: Des-01 Kontak di Bank Dunia, Jakarta: Jerry Strudwick
All provinces
Semua propinsi DG Primary and Secondary Education, Ministry of National Education
Ditjen Pendidikan Dasar dan Menengah, Departemen Pendidikan Nasional
• To improve the quality of education for primary and junior secondary school children through: (a) the production and distribution of more and better textbooks; (b) the increase in their availability in the classroom; and (c) the increase of their use by teachers.
• Meningkatkan mutu pendidikan siswa sekolah dasar dan menengah melalui: (a) produksi dan distribusi buku teks yang lebih baik mutunya dan lebih banyak; (b) menjamin ketersediaannya di kelas; (c) meningkatkan penggunaannya oleh para guru.
Page 9 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
15.
Project Objectives
Proyek)
(Tujuan Proyek)
Pelaksana)
Secondary School Teacher Development Project Loan 3979-IND Original Loan Amount: $60.4m. Canceled: $30m. Net Commitment: $30.4m. Approval Date: 2/96 Closing Date: 12/01 World Bank contact in Jakarta: Jerry Strudwick
• To enhance the teaching-learning process in secondary schools through the improvement of teacher education in public teacher training institutions.
All provinces
Semua propinsi DG Higher Education, Ministry of National Education
Ditjen Pendidikan Tinggi, Departemen Pendidikan Nasional
• Meningkatkan proses belajar-mengajar pada sekolah-sekolah tingkat menengah melalui peningkatan pendidikan guru dalam instansi-instansi pendidikan guru publik.
No. Pinjaman 3979-IND Pagu Awal Pinjaman: $60,4 juta Dibatalkan: $30 juta Pagu Bersih: $30,4 juta Tanggal Persetujuan: Peb-96 Tanggal Akhir: Des-01 Kontak di Bank Dunia, Jakarta: Jerry Strudwick 16.
East Java and East Nusa Tenggara Junior Secondary Education Project Loan 4042-IND Original Loan Amount: $99m. Canceled: $3.6m. Net Commitment: $95.4m. Approval Date: 6/96 Closing Date: 6/02 World Bank contact in Jakarta: Basilius Bengoteku
No. Pinjaman 4042-IND Pagu Awal Pinjaman: $99 juta Dibatalkan: $3,6 juta Pagu Bersih: $95,4 juta Tanggal Persetujuan: Jun-96 Tanggal Akhir: Jun-02 Kontak di Bank Dunia, Jakarta: Basilius Bengoteku
• To assist in addressing the quality and coverage of junior secondary education with objectives to: (a) maintain enrollments at pre-crisis levels; (b) maintain quality at precrisis levels; and (c) strengthen management capacity at all levels of the education system.
E. Java, E. Nusa Tenggara
Jatim, NTT
DG Primary and Secondary Education, Ministry of National Education
Ditjen Pendidikan Dasar dan Menengah, Departemen Pendidikan Nasional
• Meningkatkan mutu dan cakupan pendidikan tingkat menengah pertama di Jawa Timur dan NTT dengan tujuan: (a) mempertahankan angka partisipasi sekolah seperti sebelum krisis; (b) menjaga mutu pendidikan seperti sebelum krisis; (c) memantapkan kapasitas pengelolaan pada semua tingkat manajemen pendidikan.
Page 10 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
17.
(Tujuan Proyek)
Pelaksana)
Higher Education Support Project – Development of Undergraduate Education Loan 4043-IND Original Loan Amount: $65m. Canceled: $6.9m. Net Commitment: $58.1m. Approval Date: 6/96 Closing Date: 9/02 World Bank contact in Jakarta: Jerry Strudwick
No. Pinjaman 4043-IND Pagu Awal Pinjaman: $65 juta Dibatalkan: $6,9 juta Pagu Bersih: $58,1 juta Tanggal Persetujuan: Jun-96 Tanggal Akhir: Sep-02 Kontak di Bank Dunia, Jakarta: Jerry Strudwick 18.
Project Objectives
Proyek)
Riau, Jambi, Bengkulu, Lampung, C. Java, E. Java
Riau, Jambi, Bengkulu, Lampung, Jateng, Jatim DG Higher Education, Ministry of National Education
Ditjen Pendidikan Tinggi, Departemen Pendidikan Nasional
• To improve the quality of undergraduate education, by increasing in the mean score on the benchmark test and on the national university entrance examination score of students. • To improve the efficiency of the educational process, by decreasing the current average time to graduate. • To improve the relevance of the study programs offered, by decreasing the mean job search time of graduates.
• Meningkatkan mutu pendidikan tingkat sarjana dengan meningkatkan nilai rata-rata siswa pada test "benchmark" dan seleksi masuk perguruan tinggi nasional. • Meningkatkan efisiensi proses pendidikan dengan memperpendek waktu studi untuk lulus. • Meningkatkan relevansi program studi yang ditawarkan, dengan mempersingkat waktu rata-rata pencarian kerja bagi lulusan.
Central Indonesia Junior Secondary Education Project Loan 4062-IND Original Loan Amount: $104m. Approval Date: 7/96 Closing Date: 6/02 World Bank Contact in Jakarta: Jerry Strudwick
No. Pinjaman 4062-IND Pagu Awal Pinjaman: $104 juta Tanggal Persetujuan: Jul-96 Tanggal Akhir: Jun-02 Kontak di Bank Dunia, Jakarta: Jerry Strudwick
DI Yogyakarta, C. Java, W. Kalimantan, C. Kalimantan
DI Yogyakarta, Jateng, Kalbar, Kalteng
DG Primary and Secondary Education, Ministry of National Education
Ditjen Pendidikan Dasar dan Menengah, Departemen Pendidikan Nasional.
• To assist in addressing the quality and coverage of junior secondary education with the objectives to: (a) maintain enrollments at pre-crisis levels; (b) improve quality in junior secondary education; and (c) strengthen management capacity at all levels of the education system.
• Meningkatkan mutu dan cakupan pendidikan tingkat menengah pertama dengan tujuan: (a) mempertahankan angka partisipasi sekolah seperti sebelum krisis; (b) menjaga mutu pendidikan seperti sebelum krisis; (c) memantapkan kapasitas pengelolaan pada semua tingkat manajemen pendidikan.
Page 11 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
19.
(Tujuan Proyek)
Pelaksana)
Sumatra Junior Secondary Education Project Loan 4095-IND Original Loan Amount: $98m. Approval Date: 9/96 Closing Date: 9/02 World Bank Contact in Jakarta: Susiana Iskandar
No. Pinjaman 4095-IND Pagu Awal Pinjaman: $98 juta Tanggal Persetujuan: Sep-96 Tanggal Akhir: Sep-02 Kontak di Bank Dunia, Jakarta: Susiana Iskandar 20.
Project Objectives
Proyek)
DI Aceh, W. Sumatra, S. Sumatra, Jambi, Lampung, Bangka-Belitung
DI Aceh, Sumbar, Sumsel, Jambi, Lampung, BangkaBelitung DG Primary and Secondary Education, Ministry of National Education
Ditjen Pendidikan Dasar dan Menengah, Departemen Pendidikan Nasional
• To assist in addressing the quality and coverage of junior secondary education with the objectives to: (a) expand access to junior secondary education in a cost effective and equitable way; (b) improve quality in junior secondary education; and (c) strengthen management capacity at all levels of the education system.
• Meningkatkan mutu dan cakupan pendidikan tingkat menengah pertama dengan tujuan: (a) mempertahankan angka partisipasi sekolah seperti sebelum krisis; (b) menjaga mutu pendidikan seperti sebelum krisis; (c) memantapkan kapasitas pengelolaan pada semua tingkat manajemen pendidikan.
Quality of Undergraduate Education Project Loan 4193-IND Original Loan Amount: $71.2m. Canceled: $9.9m. Net Commitment: $61.3m. Approval Date: 6/97 Closing Date: 3/04 World Bank Contact in Jakarta: Jerry Strudwick
No. Pinjaman 4193-IND Pagu Awal Pinjaman: $71,2 juta Dibatalkan: $9,9 juta Pagu Bersih: $61,3 juta Tanggal Persetujuan: Jun-97 Tanggal Akhir: Mar-04 Kontak di Bank Dunia, Jakarta: Jerry Strudwick
Riau, W. Sumatera, Jambi, Bengkulu, Lampung, DKI Jakarta, Banten, W. Java, C. Java, E. Java, DI Yogyakarta, E. Nusa Tenggara
Riau, Sumbar, Jambi, Bengkulu, Lampung, DKI Jakarta, Banten, Jabar, Jateng, Jatim, DI Yogyakarta, NTT DG Higher Education, Ministry of National Education
Ditjen Pendidikan Tinggi, Departemen Pendidikan Nasional
• To improve the quality of undergraduate study programs in national priority fields. • To promote a more cost effective allocation of public funds by directing resources to high priority fields at both public and private universities.
• Meningkatkan mutu pendidikan dasar (kelas 1-9) dan akses yang lebih luas ke pendidikan menengah pertama pada tingkat kabupaten/kota yang berfokus pada daerah pedesaan dan terpencil. • Meningkatkan perencanaan dan pengelolaan pendidikan pada tingkat kabupaten/kota, propinsi, dan pusat; dan mengembangkan kapasitas kelembagaan maupun antar-instansi pada tingkat kabupaten/kota dan propinsi untuk menyediakan program pendidikan dasar.
Page 12 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
21.
22.
Project Objectives
Proyek)
(Tujuan Proyek)
Pelaksana)
West Java Basic Education Project • To improve quality of basic education (grades 1-9) and expanded access to junior secondary education at the district level focusing on rural and remote areas. • To improve educational planning and management at district, provincial, and central levels; and develop institutional and inter-agency capacity at district and provincial levels for the delivery of the basic education program.
Loan 4308-IND Original Loan Amount: $103.5m. Canceled: $3.8m. Net Commitment: $99.7m. Approval Date: 3/98 Closing Date: 12/04 Contact Person in Jakarta: Basilius Bengoteku
Banten, West Java
No. Pinjaman 4308-IND Pagu Awal Pinjaman: $103.5 juta Dibatalkan: 3.8 juta Pagu Bersih: $99.7 juta Tanggal Persetujuan: Mar-98 Tanggal Akhir: Des-04 Kontak di Bank Dunia, Jakarta : Basilius Bengoteku
DG Primary and Secondary Education, Ministry of National Education
Banten, Jabar
Ditjen Pendidikan Dasar dan Menengah, Departemen Pendidikan Nasional
• Meningkatkan mutu pendidikan dasar (kelas 1-9) dan akses yang lebih luas ke pendidikan menengah pertama pada tingkat kabupaten/kota yang berfokus pada daerah pedesaan dan terpencil. • Meningkatkan perencanaan dan pengelolaan pendidikan pada tingkat kabupaten/kota, propinsi, dan pusat; dan mengembangkan kapasitas kelembagaan maupun antar-instansi pada tingkat kabupaten/kota dan propinsi untuk menyediakan program pendidikan dasar.
Early Child Development Project Loan 4378-IND Original Loan Amount: $21.5m. Approval Date: 7/98 Closing Date: 3/05 Contact Person in Jakarta: Susiana Iskandar
Banten, W. Java, S. Sulawesi, Bali
No. Pinjaman 4378-IND Pagu Awal Pinjaman: $21.5 juta Tanggal Persetujuan: Jul-98 Tanggal Akhir: Mar-05 Kontak di Bank Dunia, Jakarta: Susiana Iskandar
Direktorat Pendidikan Non-Formal, Departemen Pendidikan Nasional
Banten, Jabar, Sulsel, Bali Directorate of Non-Formal Education, Ministry of National Education
• To support the short and long-term early child development needs of poor children between the ages 0-6 in Inpres Desa Tertinggal (IDT) villages in selected provinces with the objectives of providing emergency complementary food to infants between 6 and 24 months and increase access, quality and utilization of early child development programs targeted to the poor children respectively.
• Mendukung pengembangan anak usia dini (0-6 tahun) di daerah miskin/desa IDT di sejumlah propinsi dengan menyediakan makanan tambahan bagi anak usia 6-24 bulan dan meningkatkan akses, mutu dan pemanfaatan program-program pengembangan anak usia dini yang ditujukan pada kelompok miskin.
Page 13 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
23.
(Tujuan Proyek)
Pelaksana)
Sulawesi and Eastern Islands Basic Education Project Loan 4455-IND/Credit 3188-IND Original Loan Amount: $47.9m. Original Credit Amount: $15.9m. Approval Date: 4/99 Closing Date: 4/06 World Bank Contact in Jakarta: Rosfita Roesli
No. Pinjaman 4455-IND/ Kredit No.3188-IND Pagu Awal Pinjaman: $47.9 juta Pagu Awal Kredit: 15.9 juta Tanggal Persetujuan: Apr-99 Tanggal Akhir: Apr-06 Kontak di Bank Dunia, Jakarta: Rosfita Roesli
24.
Project Objectives
Proyek)
S. Sulawesi, Maluku, North Maluku
Sulsel, Maluku, Maluku Utara
DG Primary and Secondary Education, Ministry of National Education
Ditjen Pendidikan Dasar dan Menengah, Departemen Pendidikan Nasional
• To mitigate the effect of the economic crisis by maintaining primary and junior secondary enrollment and transition rates from primary to junior secondary for the poor, preventing quality from deteriorating by ensuring that schools can meet essential operational and maintenance costs, and realizing efficiency gains wherever possible. • To support recovery and return to the medium-term education strategy of improving the quality of basic education (grades 1-9) and decentralizing educational planning, management and implementation effectively to districts and below.
• Mengurangi dampak dari krisis ekonomi dengan mempertahankan angka pendaftaran masuk pendidikan dasar dan menengah dan angka peralihan dari pendidikan dasar ke menengah bagi kalangan miskin, mencegah kemerosotan kualitas dengan memastikan bahwa sekolah mampu memenuhi biaya-biaya operasional dan pemeliharaan, dan mewujudkan keuntungan-keuntungan efisiensi sejauh mungkin. • Mendukung pelaksanaan berkelanjutan dari strategi pendidikan jangka-menengah dalam meningkatkan mutu pendidikan dasar dan mendesentralisasikan perencanaan, pengelolaan, dan pelaksanaan pendidikan secara efektif ke tingkat kabupaten/kota ke bawah.
Sumatera Basic Education Project Loan 4456-IND/Credit 3189-IND Original Loan Amount: $54.5m. Original Credit Amount: $20.1m. Approval Date: 4/99 Closing Date: 4/06 World Bank Contact in Jakarta: Rosfita Roesli
N. Sumatra, Riau, Bengkulu
Sumut, Riau, Bengkulu
• To mitigate the effect of the economic crisis by maintaining from primary to junior secondary for the poor, preventing quality from deteriorating by ensuring that schools can meet essential operational and maintenance costs, and realizing primary and junior secondary enrollment and transition rates efficiency gains wherever possible.
Page 14 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
No. Pinjaman 4456-IND/ Kredit 3189-IND Pagu Awal Pinjaman: $54.5 juta Pagu Awal Kredit:$20.1 juta Tanggal Persetujuan: Apr-99 Tanggal Akhir: Apr-06 Kontak di Bank Dunia, Jakarta: Rosfita Roesli
25.
No. Kredit: 3526-IND Pagu Awal Kredit: $4.2 juta Tanggal Persetujuan: Jun-01 Tanggal Akhir: Des-04 Kontak di Bank Dunia, Jakarta: Susiana Iskandar
(Tujuan Proyek)
Pelaksana)
DG Primary and Secondary Education, Ministry of National Education
Ditjen Pendidikan Dasar dan Menengah, Departemen Pendidikan Nasional
• To support recovery and return to the medium-term education strategy of improving the quality of basic education (grades 1-9) and decentralizing educational planning, management and implementation effectively to districts and below.
• Mengurangi dampak dari krisis ekonomi dengan mempertahankan angka pendaftaran masuk pendidikan dasar dan menengah dan angka peralihan dari pendidikan dasar ke menengah bagi kalangan miskin, mencegah kemerosotan kualitas dengan memastikan bahwa sekolah mampu memenuhi biaya-biaya operasional dan pemeliharaan, dan mewujudkan keuntungan-keuntungan efisiensi sejauh mungkin. • Mendukung pelaksanaan berkelanjutan dari strategi pendidikan jangka menengah dalam meningkatkan mutu pendidikan dasar dan mendesentralisasikan perencanaan, pengelolaan, dan pelaksanaan pendidikan secara efektif ke tingkat kabupaten/kota ke bawah.
Library Development Project Credit 3526-IND Original Credit Amount: $4.2m. Approval Date: 06/01 Closing Date: 12/04 World Bank Contact in Jakarta: Susiana Iskandar
Project Objectives
Proyek)
South Sumatera, Bangka-Belitung, Central Java, West Nusa Tenggara
Sumsel, Bangka-Belitung, Jateng, NTB
National Library
Perpustakaan Nasional
• To deliver better public services to the poor. • To improve learning for children and adults. • To develop innovative approaches to increase the use of reading materials in community libraries and SD libraries. • To motivate students and communities to use, enjoy and value books for recreational and informational purposes. • To develop a strategy for community and SD library support in the rest of the participating districts, involving local community support, non governmental organizations and local government.
• Memberikan pelayanan yang lebih baik kepada masyarakat miskin. • Meningkatkan kegiatan belajar untuk anak-anak dan dewasa. • Meningkatkan pendekatan-pendekatan inovatif untuk meningkatkan penggunaan bahan bacaan di perpustakaan masyarakat dan perpustakaan SD. • Memotivasi pelajar dan masyarakat untuk menggunakan, menyukai dan menghargai buku-buku dengan tujuan rekreasi dan informasi. • Membangun strategi untuk membantu perpustakaan masyarakat dan perpustakaan SD pada kabupaten/kota-kabupaten/kota yang berpartisipasi, melibatkan masyarakat local, NGO, dan Pemda.
Page 15 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
26.
(Tujuan Proyek)
Pelaksana)
Intensified Iodine Deficiency Control Project Loan 4125-IND Original Loan Amount: $28.5m. Canceled: $9m. Net Commitment: $19.5m. Approval Date: 12/96 Closing Date: 6/02 World Bank Contact in Jakarta: Juliawati Untoro
No. Pinjaman 4125-IND Pagu Awal Pinjaman: $28,5 juta Dibatalkan: $9 juta Pagu Bersih: $19,5 juta Tanggal Persetujuan: Des-96 Tanggal Akhir: Jul-02 Kontak di Bank Dunia, Jakarta: Juliawati Untoro
27.
Project Objectives
Proyek)
• To reduce the prevalence of iodine deficiency through: (a) monitoring the iodine status of community; (b) increasing the supply and consumption of iodized salt; (c) targeting distribution of capsules; and (d) improved coordination of activities.
All provinces
Semua propinsi Directorate General of Community Health Ministry of Health
Direktorat Jenderal Kesehatan Masyarakat, Departemen Kesehatan
• Mengurangi prevalensi kekurangan zat yodium dengan: (a) memantau keadaan yodium masyarakat; (b) meningkatkan pemasokan dan konsumsi garam beryodium; (c) menetapkan target distribusi kapsul; dan (d) memperbaiki koordinasi kegiatan.
Safe Motherhood Project: A Partnership and Family Approach Loan 4207-IND Original Loan Amount: $42.5m. Canceled: $8m. Net Commitment: $34.5m. Approval Date: 7/97 Closing Date: 5/03 World Bank Contact in Jakarta: Puti Marzoeki
C. Java, E. Java
Jateng, Jatim
• To improve demand for and utilization of quality maternal health services. • To strengthen the sustainability of maternal health services at the village level. • To improve quality of family planning services and prepare adolescents to lead a healthy reproductive life.
Page 16 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
No. Pinjaman 4207-IND Pagu Awal Pinjaman: $42,5 juta Dibatalkan: $8 juta Pagu Bersih: $34,5 juta Tanggal Persetujuan: Jun-97 Tanggal Akhir: Mei-03 Kontak di Bank Dunia, Jakarta: Puti Marzoeki 28.
(Tujuan Proyek)
Pelaksana)
National Coordinating Board for Family Planning (BKKBN) and Ministry of Health
Badan Koordinasi Keluarga Berencana Nasional (BKKBN) dan Departemen Kesehatan
• Memperbaiki permintaan dan pemanfaatan pelayanan kesehatan ibu yang bermutu. • Memperkuat kelestarian pelayanan kesehatan ibu di tingkat pedesaan. • Memperbaiki kualitas pelayanan keluarga berencana dan mempersiapkan kaum remaja menempuh kehidupan reproduktif yang sehat.
Fifth Health Project Loan 4374-IND Original Loan Amount: $44.7m. Canceled: $5m. Net Commitment: $39.7m. Approval Date: 7/98 Closing Date: 3/04 World Bank Contact in Jakarta: Puti Marzoeki
C. Java, C. Kalimantan, S. Sulawesi
Jateng, Kalteng, Sulsel Secretary General, Ministry of Health
Sekretaris Jenderal, Departemen Kesehatan
No. Pinjaman 4374-IND Pagu Awal Pinjaman: $44,7 juta Dibatalkan: $5 juta Pagu Bersih: $39,7 juta Tanggal Persetujuan: Jul-98 Tanggal Akhir: Mar-04 Kontak di Bank Dunia, Jakarta: Puti Marzoeki
29.
Project Objectives
Proyek)
• Increase the decentralization of training, planning, and deployment of health personnel. • Improve the quality of health professional services and quality of pre-service and in-service training.
• Meningkatkan desentralisasi pelatihan, perencanaan dan nempatan tenaga kesehatan. • Memperbaiki pelayanan profesional kesehatan dan mutu pendidikan tenaga kesehatan dan pelatihan pegawai kesehatan.
Second Water and Sanitation for Low Income Communities Project Credit 3382-IND Original Credit Amount: $77.4m. Approval Date: 6/00 Closing Date: 06/09 (Co-financed by AusAid Grant: $6.5m) World Bank Contact in Jakarta: Richard Pollard
E. Java, W. Sumatra, S. Sumatra, W. Nusa Tenggara, Bangka-Belitung
Jatim, Sumbar, Sumsel, NTB, Bangka-Belitung
• To improve the health status, productivity and quality of life of poor communities in underserved rural villages in the project provinces. This will be done by improving the health behavior and health services of the communities related to water borne diseases; providing safe, adequate, cost effective, and easily accessible water supply and sanitation services; and developing sustainability and effectiveness through community participation.
Page 17 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
No. Kredit 3382-IND Pagu Awal Kredit: $77,4 juta Tanggal Persetujuan: Jun-00 Tanggal Akhir: Jun-09 (Pembiayaan gabungan oleh hibah Ausaid: $6,5 juta) Kontak di Bank Dunia, Jakarta: Richard Pollard 30.
(Tujuan Proyek)
Pelaksana)
Directorate General of Communicable Diseases Control, Ministry of Health
Direktorat Jenderal Pengendalian Penyakit Menular, Departemen Kesehatan
• Memperbaiki kesehatan, produktivitas dan mutu kehidupan
masyarakat miskin di desa-desa pedalaman yang kurang terlayani dalam propinsi-propinsi proyek. Ini dilakukan dengan memperbaiki perilaku kesehatan dan pelayanan kesehatan masyarakat yang terkait dengan penyakit yang ditularkan melalui air; menyediakan pelayanan air bersih dan sanitasi yang aman, murah dan mudah; mengembangkan kelanggengan/pelestarian dan efektivitas melalui peran-serta masyarakat.
Provincial Health Project Credit 3381-IND Original Credit Amount: $38m. Approval Date: 6/00 Closing Date: 6/06 World Bank Contact in Jakarta: Puti Marzoeki
No. Kredit 3381-IND Pagu Awal Kredit: $38 juta Tanggal Persetujuan: Jun-00 Tanggal Akhir: Jun-06 Kontak di Bank Dunia, Jakarta: Puti Marzoeki 31.
Project Objectives
Proyek)
• To bring about effective health decentralization. • To help the central health ministry carry out its new role in a decentralized system.
Lampung, Yogyakarta
Lampung, Yogyakarta
Secretary General, Ministry of Health
• Mengadakan desentralisasi kesehatan dengan efektif. • Membantu departemen kesehatan pusat melaksanakan peranan barunya dalam sistem yang telah didesentralisasi.
Sekretaris Jenderal, Departemen Kesehatan
Second Provincial Health Project Loan 4629-IND/Credit 3537-IND Original Loan Amount: $63.2m. Original Credit Amount: $40m. Approval Date: 6/01 Closing Date: 6/07 World Bank Contact in Jakarta: Puti Marzoeki
Banten, North Sumatera, West Java
Banten, Sumut, Jabar
• To bring about effective health sector decentralization in the provinces by initiating key sector reforms and putting health financing on a firm footing, while protecting health services which are essential for the poor and the public at large. • To help the Ministry of Health and Social Welfare carry out its roles in a decentralized system. These responsibilities involve providing sectoral leadership, analysis, and policy follow up of health needs, and advocacy of best practice.
Page 18 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
No. Pinjaman 4629-IND Pagu Awal Pinjaman: $63,2 juta Pagu Awal Credit: $40 juta Tanggal Persetujuan: Jun-01 Tanggal Akhir: Jun-07 Kontak di Bank Dunia, Jakarta: Puti Marzoeki
Project Objectives
Proyek)
(Tujuan Proyek)
Pelaksana)
Secretary General, Ministry of Health
Sekretaris Jenderal, Departemen Kesehatan
• Untuk membangun desentralisasi sektor kesehatan yang efektif di propinsi-propinsi dengan memulai reformasi sektor utama dan menempatkan pembiayaan kesehatan pada dasar yang kokoh sambil melindungi pelayanan kesehatan yang penting untuk masyarakat miskin dan masyarakat keseluruhan. • Untuk membantu Departemen Kesehatan dan Kesejahteraan Sosial dalam melaksanakan perannya dalam sistem desentralisasi. Tanggung jawab ini termasuk menyediakan kepemimpinan sektoral, analisa, dan kebijakan tindak lanjut dari kebutuhan kesehatan, dan anjuran praktek terbaik.
Page 19 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
32.
(Tujuan Proyek)
Pelaksana)
Second Highway Sector Investment Project Loan 3712-IND Original Loan Amount: $350m. Canceled: $46m. Net Commitment: $304m. Approval Date: 3/94 Closing Date: 12/01 World Bank Contact in Jakarta: Robert Scouller
No. Pinjaman 3712-IND Pagu Awal Pinjaman: $350 juta Dibatalkan: $46 juta Pagu Bersih: $304 juta Tanggal Persetujuan: Mar-94 Tanggal Akhir: Des-01 Kontak di Bank Dunia, Jakarta: Robert Scouller
33.
Project Objectives
Proyek)
All provinces
Semua propinsi
DG Regional Infrastructure, Ministry Of Settlement and Regional Infrastructure
Direktorat Jenderal Prasarana Wilayah, Departemen Pemukiman dan Prasarana Wilayah
• Help GOI in meeting the rapid growth in road traffic and to reduce road transport system costs through: (a) improvements in the service quality of the road network; (b) expansion of the capacity of the road network with due regard to environmental and social impacts; (c) improvements in the quality of execution of road works; (d) strengthening of the institutional capacity of the DG Regional Infrastructure Development in planning, programming and execution of road works; (e) improvements in road sector policies and strengthening of the capacity of Ministry of Communication and Directorate General of Land Communication.
• Membantu GOI dalam menghadapi pertumbuhan lalu lintas jalan yang pesat dan mengurangi biaya sistem transportasi jalan dengan: (a) memperbaiki kualitas pelayanan jaringan jalan; (b) memperluas kapasitas jaringan jalan dengan mengindahkan dampak lingkungan dan sosial; (c) memperbaiki kualitas pelaksanaan pekerjaan jalan; (d) meningkatkan kapasitas kelembagaan Direktorat Jenderal Pembangunan Infrastruktur Daerah dalam perencanaan, pemrograman dan pelaksanaan pekerjaan jalan; (e) memperbaiki kebijakan sektor jalan dan meningkatkan kapasitas Departemen Perhubungan dan Direktorat Jenderal Perhubungan Darat.
Strategic Urban Roads Infrastructure Project Loan 4054-IND Original Loan Amount: $86.9m. Canceled: $10m. Net Commitment: $76.9m. Approval Date: 6/96 Closing Date: 09/02 World Bank Contact in Jakarta: Robert Scouller
Banten, West Java, Central Java
Banten, Jabar, Jateng DG Regional Infrastructure, Ministry Of Settlement and Regional Infrastructure
Direktur Jenderal Prasarana Wilayah, Departemen Pemukiman dan Prasarana Wilayah
• Reduce traffic bottlenecks on the national road network in selected urban areas in the North Java corridor. • Address the environmental, quality of life, and social issues associated with the use of the national road network. • Strengthen capabilities of GOI's central and local government agencies involved in urban road development and management. • Assist GOI in the articulation and implementation of an urban transport policy.
Page 20 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
(Tujuan Proyek)
Pelaksana) • Mengurangi kemacetan lalulintas pada jaringan jalan nasional di daerah-daerah perkotaan tertentu di bagian utara pulau Jawa. • Menangani persoalan lingkungan dan sosial yang terkait dengan penggunaan jaringan jalan nasional. • Memperkuat kemampuan pemerintah daerah dan pemerintah pusat yang terlibat dalam pembangunan dan pengelolaan jalan perkotaan • Membantu pemerintah Indonesia menginterpretasikan dan mengimplementasikan kebijakan transportasi perkotaan.
No. Pinjaman 4054-IND Pagu Awal Pinjaman: $86,9 juta Dibatalkan: $10 juta Pagu Bersih: $76,9 juta Tanggal Persetujuan: Jun-96 Tanggal Akhir: Sep-02 Kontak di Bank Dunia, Jakarta: Robert Scouller
34.
Project Objectives
Proyek)
Railway Efficiency Project Loan 4106-IND Original Loan Amount: $105m. Canceled: $20m. Net Commitment: $85m. Approval Date: 11/96 Closing Date: 09/02 World Bank Contact in Jakarta: Robert Scouller
No. Pinjaman 4106-IND Pagu Awal Pinjaman: $105 juta Dibatalkan: $20 juta Pagu Bersih: $85 juta Tanggal Persetujuan: Nov-96 Tanggal Akhir: Sep-02 Kontak di Bank Dunia, Jakarta: Robert Scouller
DKI Jakarta, W. Java, DI Yogyakarta
DKI Jakarta, Jabar, DI Yogyakarta
PT. Kereta Api Indonesia
• To improve the economic efficiency and service quality of Indonesia's railway subsector, focusing on policy reform by restructuring the railway corporation, reforming the relationship between it and government, and creating the foundations for expanded private participation; rationalizing railway subsector capital investments; improving railway subsector management and operations. • Increasing the physical capacity of an important railway corridor by double tracking sections of track between Jakarta-Bandung.
• Memperbaiki efisiensi ekonomi dan kualitas pelayanan subsektor angkutan kereta api di Indonesia, yang berfokus pada reformasi kebijakan dengan merestrukturisasi perusahaan angkutan kereta api, mereformasi hubungan antara perusahaan dengan pemerintah, dan menciptakan dasar untuk mengembangkan partisipasi sektor swasta; merasionalisasi investasi modal subsektor angkutan kereta api ; memperbaiki pengelolaan dan pengoperasian subsektor angkutan kereta api. • Meningkatkan kapasitas fisik angkutan kereta api dengan rel ganda untuk jalur rel antara Jakarta-Bandung.
Page 21 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
35.
Project Objectives
Proyek)
(Tujuan Proyek)
Pelaksana)
Sumatra Regional Road Project Loan 4307-IND Original Loan Amount: $234m. Canceled: $50m. Net Commitment: $184m. Approval Date: 03/98 Closing Date: 12/03 World Bank Contact in Jakarta: Robert Scouller
No. Pinjaman 4307-IND Pagu Awal Pinjaman: $234 juta Dibatalkan: $50 juta Pagu Bersih: $184 juta Tanggal Persetujuan: Mar-98 Tanggal Akhir: Des-03 Kontak di Bank Dunia, Jakarta: Robert Scouller
DI Aceh, N. Sumatra, Riau, W. Sumatera, Jambi, Bengkulu, S. Sumatera, Lampung, Bangka-Belitung
DI Aceh, Sumut, Riau, Sumbar, Jambi, Bengkulu, Sumsel, Lampung, Bangka-Belitung DG Regional Infrastructure, Ministry Of Settlement and Regional Infrastructure
Direktorat Jenderal Prasarana Wilayah, Departemen Pemukiman dan Prasarana Wilayah
• Improve transport efficiency and accessibility within the nine provinces of the Sumatra region by: (a) planning and management of transport infrastructure; (b) development and preservation of the road networks in the project area; (c) improvements in resource use and service delivery through gains in policy implementation and technical efficiency.
• Memperbaiki efisiensi dan aksesibilitas dari sembilan propinsi di wilayah Sumatera melalui: (a) perencanaan dan pengelolaan infrastruktur transportasi; (b) pembangunan dan pelestarian jaringan jalan di daerah proyek; (c) perbaikan dalam penggunaan sumber daya dan pemberian pelayanan melalui hasil dari implementasi kebijakan dan efisiensi di bidang teknis.
Page 22 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
36.
(Tujuan Proyek)
Pelaksana)
Semarang-Surakarta Urban Development Project Loan 3749-IND Original Loan Amount: $174m. Canceled: $41.4m. Net Commitment: $132.6m. Approval Date: 6/94 Closing Date: 9/01 World Bank Contact in Jakarta: Risyana Sukarma
No. Pinjaman 3749-IND Pagu Awal Pinjaman: $174 juta Dibatalkan: $41,4 juta Pagu Bersih: $132,6 juta Tanggal Persetujuan: Jun-94 Tanggal Akhir: Sep-01 Kontak di Bank Dunia, Jakarta: Risyana Sukarma
37.
Project Objectives
Proyek)
Semarang and Surakarta (C. Java)
Semarang, Surakarta (Jateng) Directorate General of Urban and Rural Development, Ministry of Settlement and Regional Infrastructure
Direktorat Jenderal Pengembangan Perkotaan dan Pedesaan, Departemen Pemukiman dan Prasarana Wilayah
• To increase the provision of urban infrastructure services and the efficiency of urban investments. • To promote stronger, more autonomous, and financially more independent municipal governments. • To contribute towards urban poverty alleviation, mainly through better access to essential services and an improved urban environment
• Meningkatkan penyediaan pelayanan infrastruktur kota dan efisiensi investasi perkotaan. • Mengembangkan pemerintah-pemerintah kotamadya yang lebih kuat, lebih mandiri dan secara keuangan lebih independen. • Menyumbang kepada pengentasan kemiskinan kota, terutama melalui akses yang lebih baik ke pelayanan dasar dan lingkungan perkotaan yang baik.
Kalimantan Urban Development Project Loan 3854-IND Original Loan Amount: $136m. Canceled: $18m. Net Commitment: $118m. Approval Date: 3/95 Closing Date: 12/01 World Bank Contact in Jakarta: George Soraya
No. Pinjaman 3854-IND Pagu Awal Pinjaman: $136 juta Dibatalkan: $18 juta Pagu Bersih: $118 juta Tanggal Persetujuan: Mar-95 Tanggal Akhir: Des-01 Kontak di Bank Dunia, Jakarta: George Soraya
W. Kalimantan, C. Kalimantan, S. Kalimantan, E. Kalimantan
Kalbar, Kalteng, Kalsel, Kaltim
Directorate General of Urban and Rural Development, Ministry of Settlement & Regional Infrastructure
Direktorat Jenderal Pembangunan Perkotaan dan Pedesaan, Departemen Pemukiman dan Prasarana Wilayah
• To increase the provision of urban infrastructure services and the efficiency of urban investments. • To promote stronger, more autonomous, and financially more independent municipal governments. • To contribute towards urban poverty alleviation, mainly through better access to essential services and an improved urban environment.
• Meningkatkan penyediaan pelayanan infrastruktur kota dan efisiensi investasi perkotaan. • Mengembangkan pemerintah-pemerintah kotamadya yang lebih kuat, lebih mandiri dan secara keuangan lebih independen. • Menyumbang kepada pengentasan kemiskinan kota, terutama melalui akses yang lebih baik dengan penyediaan pelayanan yang utama dan lingkungan perkotaan yang diperbaiki.
Page 23 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
38.
(Tujuan Proyek)
Pelaksana)
Second Technical Assistance Project for Public and Private Provision of Infrastructure Loan 3913-IND Original Loan Amount: $28m. Canceled: $3m. Net Commitment: $25m. Approval Date: 6/95 Closing Date: 12/01 World Bank Contact in Jakarta: Aniruddha Dasgupta
No. Pinjaman 3913-IND Pagu Awal Pinjaman: $28 juta Dibatalkan: $3 juta Pagu Bersih: $25 juta Tanggal Persetujuan: Jun-95 Tanggal Akhir: Des-01 Kontak di Bank Dunia, Jakarta: Aniruddha Dasgupta
39.
Project Objectives
Proyek)
All provinces
Semua propinsi National Development Planning Agency
Badan Perencanaan Pembangunan Nasional (Bappenas)
• To assess strategic priorities for reducing infrastructure bottlenecks and develop an updated strategy for publicprivate partnerships and suitable frameworks for private participation in the provision of infrastructure services. • To redefine the relative roles of the central and local authorities in the identification, preparation and implementation of infrastructure projects and enhance program evaluation capability within Bappenas and regional planning bodies and project preparation and implementation capabilities in line agencies and local governments responsible for various infrastructure investments.
• Menilai prioritas strategis untuk mengurangi kemacetan infrastruktur dan mengembangkan strategi mutakhir untuk kemitraan pemerintahswasta, dan kerangka-kerangka yang cocok untuk partisipasi swasta dalam penyediaan pelayanan infrastruktur. • Mendefinisi ulang kewenangan otoritas pusat dan daerah dalam pengidentifikasian, penyusunan dan pelaksanaan proyek-proyek infrastruktur dan meningkatkan kemampuan pengevaluasian program dalam Bappenas dan badan-badan perencana daerah dan kemampuan penyusunan dan pelaksanaan dalam instansi/badan terkait dan pemerintah-pemerintah daerah yang bertanggung jawab atas berbagai investasi infrastruktur.
Second East Java Urban Development Project Loan 4017-IND Original Loan Amount: $142.7m. Canceled: $60.5m. Net Commitment: $82.2m. Approval Date: 5/96 Closing Date: 12/01 World Bank Contact in Jakarta: George Soraya
E. Java
Jatim
• To improve the provision of urban services to residential communities and economic activities with priority to poor and underserved neighborhoods. • To strengthen local capacities for operation and maintenance of urban service systems, and increase the effectiveness of local resource mobilization and management in continuation of the East Java Bali Urban Development Project.
Page 24 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
No. Pinjaman 4017-IND Pagu Awal: $142,7 juta Dibatalkan: $60,5 juta Pagu Bersih: $89,2 juta Tanggal Persetujuan: Mei-96 Tanggal Akhir: Des-01 Kontak di Bank Dunia, Jakarta: George Soraya
40.
Project Objectives
Proyek)
(Tujuan Proyek)
Pelaksana)
Directorate General of Urban and Rural Development, Ministry of Settlement and Regional Infrastructure
Direktorat Jenderal Pengembangan Perkotaan dan Pedesaan, Departemen Pemukiman dan Prasarana Wilayah
• To support the efforts to operationally define the Repelita VII urban/regional development strategy to include environmental management, land development controls, and private sector participation by supporting the preparation of an East Java Strategic Regional Development Program.
• Meningkatkan penyediaan pelayanan kota kepada masyarakat perumahan dan aktivitas-aktivitas ekonomi dengan prioritas kepada lingkungan yang miskin dan kurang terlayani. • Memperkuat kapasitas lokal untuk O&M sistem-sistem pelayanan kota, dan meningkatkan keefektifan mobilisasi dan pengelolaan sumber daya lokal dalam melanjutkan Proyek Pembangunan perkotaan Jawa Timur-Bali. • Mendukung upaya-upaya untuk mendefinisikan secara operasional strategi pembangunan kota/daerah Repelita VII, termasuk pengelolaan lingkungan, pengendalian pengembangan tanah dan partisipasi sektor swasta dengan mendukung penyusunan Program Meningkatkan Pembangunan Daerah Strategis Jawa Timur.
Second Sulawesi Urban Development Project Loan 4105-IND Original Loan Amount: $155m. Canceled: $67.1m. Net Commitment: $88m. Approval Date: 11/96 Closing Date: 12/01 World Bank Contact in Jakarta: Risyana Sukarma
N. Sulawesi, Gorontalo, C. Sulawesi, S. Sulawesi, S.E. Sulawesi
Sulut, Gorontalo, Sulteng, Sulsel, Sultra
• To improve the provision of urban services through appropriate economic investments in physical infrastructure (roads, water supply, sanitation, drainage, solid waste management, markets, and transport terminals). • To strengthen operations and maintenance activities for urban services, and support improved planning, programming, budgeting, financial management and local revenue generation by local governments. • To improve urban environmental management and to reduce local environmental impacts.
Page 25 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
No. Pinjaman 4105-IND Pagu Awal: $155 juta Dibatalkan: $67,1 juta Pagu Bersih: $88 juta Tanggal Persetujuan: Nov-96 Tanggal Akhir: Des-01 Kontak di Bank Dunia, Jakarta: Risyana Sukarma
41.
Project Objectives
Proyek)
(Tujuan Proyek)
Pelaksana)
Directorate General of Urban and Rural Development, Ministry of Settlement & Regional Infrastructure
Direktorat Jenderal Pengembangan Perkotaan and Pedesaan, Departemen Pemukiman dan Prasarana Wilayah
• Meningkatkan penyediaan pelayanan kota melalui investasi ekonomi yang tepat dalam infrastruktur fisik (jalan, instalasi air bersih, sanitasi, drainase, pengelolaan limbah padat, pasar dan terminal angkutan). • Memperkuat aktivitas-aktivitas operasi dan pemeliharaan untuk pelayanan kota, dan mendukung peningkatan perencanaan, pemrograman, penganggaran, pengelolaan keuangan dan perolehan pendapatan daerah oleh pemerintah-pemerintah daerah. • Meningkatkan pengelolaan lingkungan kota dan mengurangi dampak lingkungan di daerah.
Bali Urban Infrastructure Project • To improve urban infrastructure services in order to meet the basic needs of important urban centers and growing urbanization.
Loan 4155-IND Original Loan Amount: $110m. Canceled: $30.1m. Net Commitment: $79.9m. Approval Date: 5/97 Closing Date: 12/02 World Bank Contact in Jakarta: George Soraya
Bali
No. Pinjaman 4155-IND Pagu Awal Pinjaman: $110 juta Dibatalkan: $30,1 juta Pagu Bersih: $79,9 juta Tanggal Persetujuan: Mei-97 Tanggal Akhir: Des-02 Kontak di Bank Dunia, Jakarta: George Soraya
Direktorat Jenderal Pengembangan Perkotaan dan Pedesaan, Departemen Pemukiman dan Prasarana Wilayah
Directorate General of Urban and Rural Development, Ministry of Settlement & Regional Infrastructure
• Meningkatkan pelayanan infrastruktur kota guna memenuhi kebutuhan dasar dari pusat-pusat kota utama dan urbanisasi yang semakin meningkat.
Page 26 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
42.
Project Objectives
Proyek)
(Tujuan Proyek)
Pelaksana)
Municipal Innovation Project Loan 4440-IND Original Loan Amount: $5m. Approval Date: 2/99 Closing Date: 12/01 World Bank Contact in Jakarta: Dharmapatni Dayu
No. Pinjaman 4440-IND Pagu Awal Pinjaman: $5 juta Tanggal Persetujuan: Peb-99 Tanggal Akhir: Des-01 Kontak di Bank Dunia, Jakarta: Dharmapatni Dayu
DI Aceh, N. Sumatera, Riau, Bengkulu, S. Sumatera, Lampung, Bangka-Belitung, DKI Jakarta, Banten, W. Java, C. Java, E. Java, DI Yogyakarta, Bali, E. Nusa Tenggara, W. Kalimantan, S. Kalimantan, E. Kalimantan, N. Sulawesi, Gorontalo, S. Sulawesi, S.E. Sulawesi
DI Aceh, Sumut, Riau, Bengkulu, Sumsel, Lampung, Bangka-Belitung, DKI Jakarta, Banten, Jabar, Jateng, Jatim, DI Yogyakarta, Bali, NTT, Kalbar, Kalsel, Kaltim, Sulut, Gorontalo, Sulsel, Sultra Directorate General of Regional Autonomy, Ministry of Home Affairs
• To promote institutional reform and demonstrate that clientresponsive municipal service improvements can be stimulated through small efforts and funded on a competitive basis. In particular, to encourage efficient municipal innovation projects, dissemination of successes and improving central government practices.
• Memajukan reformasi kelembagaan dan membuktikan bahwa perbaikan pelayanan kotamadya yang bersifat responsif kepada pelanggan dapat dirangsang melalui upaya-upaya kecil dan didanai atas dasar yang kompetitif. Secara khusus, mendorong proyek-proyek inovasi kotamadya yang efisien, menyebar luaskan keberhasilan dan memperbaiki praktek-praktek pemerintah pusat.
Direktorat Jenderal Otonomi Daerah (PUOD), Departemen Dalam Negeri 43.
Urban Poverty Project Credit 3210-IND Original Credit Amount: $95.8m. Approval Date: 5/99 Closing Date: 6/02 World Bank Contact in Jakarta: George Soraya
No. Kredit 3210-IND Pagu Awal Kredit: $95,8juta. Tanggal Persetujuan: Mei-99 Tanggal Akhir: Jun-02 Kontak di Bank Dunia, Jakarta: George Soraya
DKI Jakarta, Banten, W. Java, C. Java, E. Java, DI Yogyakarta
DKI Jakarta, Banten, Jabar, Jateng, Jatim, DI Yogyakarta
Directorate General of Urban and Rural Development, Ministry of Settlement & Regional Infrastructure
Direktorat Jenderal Pengembangan Perkotaan dan Pedesaan, Departemen Pemukiman dan Prasarana Wilayah
• To improve basic infrastructure in poor urban neighborhoods and promote sustainable income generation for urban poor with a bottom up approach. • To strengthen the capability of local agencies to assist poor communities.
• Meningkatkan infrastruktur dasar di lingkungan perkotaan yang miskin dan memajukan perolehan penghasilan secara berkesinambungan untuk orang-orang miskin perkotaan dengan pendekatan dari bawah ke atas (bottom up). • Memperkuat kemampuan institusi lokal untuk membantu masyarakat miskin.
Page 27 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
44.
Project Objectives
Proyek)
(Tujuan Proyek)
Pelaksana)
Western Java Environment Management Project Loan 4612-IND/Credit 3519-IND/ TF-029805 Original Loan Amount: $11.7m. Original Credit Amount: $5.8m. GEF Grant Amount: $2.5m. Approval Date: 06/01 Closing Date: 06/05 World Bank Contact in Jakarta: Suhadi Hadiwinoto
No. Pinjaman 4612-IND/Kredit 3519-IND/TF-029805 Pagu Awal Pinjaman: $11,7 juta Pagu Awal Kredit: $5,8 juta Pagu Hibah GEF: $2,5 juta Tanggal Persetujuan: Jun-01 Tanggal Akhir: Jun-05 Kontak di Bank Dunia Jakarta: Suhadi Hadiwinoto
DKI Jakarta, Banten, West Java
DKI Jakarta, Banten, Jabar
Director General of Urban and Rural Development, Ministry of Settlement and Regional Infrastructure
Direktorat Jenderal Pengembangan Perkotaan dan Pedesaan, Departemen Permukiman dan Prasarana Wilayah
• To strengthen institutionally and economically the local, provincial and regional institutions responsible for waste management and environmental control. • To develop local environmental strategies and plans within the national strategy. • To increase community awareness and participation in environmental management both at the local government and community levels. • To improve waste collection and disposal as well as support activities directed at waste reduction, reuse and recycling. • To improve the environmental conditions of a number specific, high priority localities. • To assist in developing a commercial level composting industry through a grant from the Global Environmental Facility (GEF).
• Untuk meningkatkan secara institusi dan ekonomi, institusi daerah, propinsi dan regional yang bertanggung jawab untuk manajemen pembuangan dan pengendalian lingkungan. • Untuk meningkatkan strategi lingkungan daerah dan rencana dalam strategi nasional. • Untuk meningkatkan kesadaran masyarakat dan partisipasi dalam manajemen lingkungan, baik pemerintah daerah maupun tingkat masyarakat. • Untuk memperbaiki pengumpulan dan pembuangan sampah serta mendukung kegiatan yang ditujukan pada pengurangan, penggunaan kembali dan daur ulang sampah. • Untuk meningkatkan kondisi lingkungan dari beberapa daerah yang khusus dan berprioritas utama. • Untuk membantu dalam membangun tingkat komersial dari industri kompos melalui hibah dari Fasilitas Lingkungan Global (GEF).
Page 28 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
45.
(Tujuan Proyek)
Pelaksana)
Second Power Transmission and Distribution Project Loan 3978-IND Original Loan Amount: $373m. Canceled: $163.7m. Net Commitment: $209.3m. Approval Date: 2/96 Closing Date: 05/02 World Bank Contact in Jakarta: David M. Hawes
DKI Jakarta, Banten, W. Java, C. Java, E. Java, DI Yogyakarta
DKI Jakarta, Banten, Jabar, Jateng, Jatim, DI Yogyakarta
• To increase the physical capacity, efficiency and reliability of the Java-Bali transmission system and distribution network. • To promote sector efficiency, competition and private sector participation by implementing functional decentralization of PLN operations in Java-Bali and developing regulatory oversight and institutions.
PT. PLN (Persero)
• Meningkatkan kapasitas, efisiensi dan keterandalan fisik sistem transmisi dan jaringan distribusi Jawa-Bali. • Memajukan efisiensi sektor, persaingan dan partisipasi sektor swasta dengan mengimplementasikan desentralisasi fungsional dari operasi PLN di Jawa-Bali serta mengembangkan pengawasan peraturan dan instansi-instansi.
Lampung, Banten, W. Java, S. Sulawesi
• To provide modern energy form of electricity to rural
No. Pinjaman 3978-IND Pagu Awal Pinjaman: $373 juta Dibatalkan: $163,7 juta Pagu Bersih: $209,3 juta Tanggal Persetujuan: Peb-96 Tanggal Akhir: Mei-02 Kontak di Bank Dunia, Jakarta: David M. Hawes 46.
Project Objectives
Proyek)
Solar Home Systems Project GEF Grant TF028488 Original Grant Amount: $24.3m. Canceled: $13.3m. Approval Date: 03/97 Closing Date: 04/04 World Bank Contact in Jakarta: David M. Hawes
Lampung, Banten, Jabar, Sulsel • • • •
consumers who cannot be served economically or in a timely manner by conventional rural electrification. To facilitate participation by the private sector in advancing renewable energy commercialization. To promote environmentally sound energy development in Indonesia and reduce the energy sector’s dependence on fossil fuel. To strengthen Indonesia’s institutional capacity to support and sustain decentralized rural electrification using solar photovoltaics. The global environment objective is to mitigate emissions of carbon dioxide in Indonesia.
Page 29 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
Hibah GEF TF028488 Pagu Awal Hibah: $24.3 juta Dibatalkan: $13.3 juta Tanggal Persetujuan: 03/97 Tanggal Akhir: 04/04 World Bank Contact in Jakarta: David M. Hawes
Project Objectives
Proyek)
(Tujuan Proyek)
Pelaksana)
Agency for Application and Assessment of Technology (BPPT), Directorate General for Electricity and Energy Utilization, Ministry of Energy and Mineral Resources
Badan Pengkajian dan Penerapan Teknologi (BPPT), Dirjen Listrik dan Pemanfaatan Energi, Departemen Energi dan Sumber Daya Mineral
• Menyediakan bentuk energi listrik modern yang ramah lingkungan, kepada pelanggan pedesaan yang tidak dapat dilayani secara ekonomis dan tepat waktu melalui penyaluran listrik pedesaan yang konvensional. • Memfasilitasi partisipasi sektor swasta dalam memajukan komersialisasi energi yang dapat diperbaharui. • Mempromosikan pengembangan sumber daya energi yang sehat di Indonesia dan mengurangi ketergantungan sektor energi pada bahan bakar fosil. • Memperkuat kapasitas kelembagaan di Indonesia untuk mendukung dan melestarikan penyaluran listrik pedesaan yang telah didesentralisasikan dengan menggunakan tenaga surya photovoltaics. • Tujuan lingkungan global adalah untuk mengurangi emisi CO2 di Indonesia.
Page 30 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
47.
(Tujuan Proyek)
Pelaksana)
Telecommunication Sector Modernization Project Loan 3904-IND Original Loan Amount: $325m. Canceled: $69.7m. Net Commitment: $255.3m. Approval Date: 6/95 Closing Date: 6/02 World Bank Contact in Jakarta: Bernard Drum
No. Pinjaman 3904-IND Pagu Awal Pinjaman: $325 juta Dibatalkan: $69,7 juta Pagu Bersih: $255,3 juta Tanggal Persetujuan: Jun-95 Tanggal Akhir: Jun-02 Kontak di Bank Dunia, Jakarta: Bernard Drum 48.
Project Objectives
Proyek)
DKI Jakarta, E. Java, W. Kalimantan, C. Kalimantan, S. Kalimantan, E. Kalimantan, N. Sulawesi, Gorontalo, C. Sulawesi, S. Sulawesi, S.E. Sulawesi
• To support the government's telecommunication sector reform program based on: (a) entry of world class operators; (b) competition in all segments of the sector; and (c) reorganization of PT. Telkom.
DKI Jakarta, Jatim, Kalbar, Kalteng, Kalsel, Kaltim, Sulut, Gorontalo, Sulteng, Sulut, Sultra
• Mendukung program reformasi sektor telekomunikasi pemerintah dengan: (a) masuknya operator kelas dunia, (b) persaingan dalam segala segmen sektor; dan (c) reorganisasi PT. Telkom.
PT. Telkom, Indonesia
Industrial Technology Development Project Loan 3972-IND Original Loan Amount: $47m. Canceled: $8.5m. Net Commitment: $38.5m. Approval Date: 12/95 Closing Date: 12/01 World Bank Contact in Jakarta: Bernard Drum
No. Pinjaman 3972-IND Pagu Awal Pinjaman: $47 juta Dibatalkan: $8,5 juta Pagu Bersih: $38,5 juta Tanggal Persetujuan: Des-95 Tanggal Akhir: Des-01 Kontak di Bank Dunia, Jakarta: Bernard Drum
All provinces
Semua propinsi Ministry of Trade and Industry, BPPT, Ministry of State for Research and Technology and Indonesian Institute of Sciences
Departemen Perdagangan dan Industri, BPPT, Menteri Negara Riset dan Teknologi serta Lembaga Ilmu Pengetahuan Indonesia
• To enhance competitiveness of small and medium industries by: (a) providing public and private technology support services; (b) facilitating the access to public and private technology service providers; (c) strengthening public technology support institutions; and (d) improving the formulation and coordination of industrial technology policies
• Meningkatkan daya saing industri-industri kecil dan menengah dengan: (a) menyediakan pelayanan pendukung teknologi publik dan swasta; (b) memfasilitasi akses ke penyedia jasa teknologi publik dan swasta; (c) memperkuat instansi-instansi pendukung teknologi publik; dan (d) memperbaiki perumusan dan koordinasi kebijakan-kebijakan teknologi industri.
Page 31 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
49.
Project Objectives
Proyek)
(Tujuan Proyek)
Pelaksana)
Information Infrastructure Development Project Loan 4244-IND Original Loan Amount: $34.5m. Canceled: $8.5m. Net Commitment: $26m. Approval Date: 11/97 Closing Date: 6/03 World Bank Contact in Jakarta: Bernard Drum
• To enhance private sector participation in the provision of information technology, post and tourism services through the removal of barriers to entry.
National
Nasional Ministry of Tourism, Post and Telecommunication
Departemen Pariwisata, Pos dan Telekomunikasi
• Meningkatkan partisipasi sektor swasta dalam menyediakan jasa pelayanan teknologi informasi, pos dan pariwisata melalui pencabutan rintangan-rintangan untuk memasuki industri.
No. Pinjaman 4244-IND Pagu Awal Pinjaman: $34,5 juta Dibatalkan: $8,5 juta Pagu Bersih: $26 juta Tanggal Persetujuan: Nov-97 Tanggal Akhir: Jun-03 Kontak di Bank Dunia, Jakarta: Bernard Drum 50.
Corporate Restructuring Technical Assistance Project Loan 4448-IND Original Loan Amount: $31.5m. Canceled: $21.5m. Net Commitment: $10m. Approval Date: 3/99 Closing Date: 12/02 World Bank Contact in Jakarta: Bernard Drum
No. Pinjaman 4448-IND Pagu Awal Pinjaman: $31,5 juta Dibatalkan: $21,5 juta Pagu Bersih: $10 juta Tanggal Persetujuan: Mar-99 Tanggal Akhir: Des-02 Kontak di Bank Dunia, Jakarta: Bernard Drum
All provinces
Semua propinsi
Jakarta Initiative Task Force
Satuan Tugas Prakarsa Jakarta
• To assist the government in implementing key elements of the Jakarta Initiative that establishes a voluntary framework for corporate and debt restructuring and seeks to remove legal, regulatory and administrative obstacles to the approval of restructuring agreed between debtors and creditors, strengthen the bankruptcy system and achieve legal reforms to improve the competitiveness and efficiency of the corporate sector.
• Membantu pemerintah dalam mengimplementasikan unsur-unsur utama Inisiatif Jakarta yang menetapkan dasar sukarela untuk melakukan restrukturisasi perusahaan dan utang serta berupaya mencabut hambatan-hambatan hukum, peraturan dan administrasi terhadap persetujuan restrukturisasi yang telah disepakati antara debitur dengan kreditur, memperkuat sistem kepailitan dan mencapai reformasi hukum untuk memperbaiki daya saing dan efisiensi sektor perusahaan.
Page 32 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
51.
Project Objectives
Proyek)
(Tujuan Proyek)
Pelaksana)
BEPEKA Audit Modernization Project Loan 4194-IND Original Loan Amount: $16.4m. Canceled: $0.9m. Net Commitment: $15.5m. Approval Date: 6/97 Closing Date: 12/02 World Bank Contact in Jakarta: Unggul Suprayitno
No. Pinjaman 4194-IND Pagu Awal Pinjaman: $16,4 juta Dibatalkan: $0,9 juta Pagu Bersih: $15,5 juta Tanggal Persetujuan: Jun-97 Tanggal Akhir: Des-02 Kontak di Bank Dunia, Jakarta: Unggul Suprayitno
All provinces
Semua propinsi Supreme Audit Agency
Badan Pemeriksa Keuangan (BEPEKA)
• To assist BEPEKA to better assess the accountability of public finances through the enhancement of its financial and performance audit capabilities by: (a) supporting BEPEKA's efforts to remove existing audit scope limitations and other regulatory constraints and carry out full-fledged financial and performance audits; (b) promoting user demand for such audits; (c) reducing internal supply constraints by upgrading technical and managerial skills; (d) building up the audit management information system; and (e) institutionalizing international best practices.
• Membantu BEPEKA menilai dengan lebih baik pertanggung-jawaban keuangan publik melalui peningkatan kemampuan audit keuangan dan kinerjanya dengan: (a) mendukung upaya-upaya BEPEKA untuk mencabut pembatasan-pembatasan ruang lingkup audit yang berlaku serta pembatasan-pembatasan lain dan melaksanakan audit keuangan dan kinerja yang menyeluruh; (b) memajukan permintaan pengguna untuk audit; (c) mengurangi keterbatasan sumber daya internal dengan meningkatkan keahlian teknik dan pengelolaan; (d) membangun sistem informasi pengelolaan audit; dan (e) melembagakan praktek-praktek terbaik internasional.
Page 33 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
52.
53.
Project Objectives
Proyek)
(Tujuan Proyek)
Pelaksana)
Kecamatan Development Project Loan 4330-IND/Credit 3453-IND Original Loan Amount: $225m. Original Credit Amount: $48.2m. Approval Date: 6/98 Closing Date: 12/02 World Bank Contact in Jakarta: Scott Guggenheim
DI Aceh, N. Sumatera, Riau, W. Sumatera, S. Sumatera, Lampung, Bangka-Belitung, Banten, W. Java, C. Java, DI Yogyakarta, E. Java, E. Nusa Tenggara, C. Kalimantan, S. Kalimantan, N. Sulawesi, Gorontalo, C. Sulawesi, S. Sulawesi, S.E. Sulawesi, N. Maluku, Maluku, Irian Jaya
No. Pinjaman 4330-IND/ Kredit 3453-IND Pagu Awal Pinjaman: $225 juta Pagu Awal Kredit: $48,2 juta Tanggal Persetujuan: Jun-98 Tanggal Akhir: Des-02 Kontak di Bank Dunia, Jakarta: Scott Guggenheim
DI Aceh, Sumut, Riau, Sumbar, Sumsel, Lampung, Bangka-Belitung, Banten, Jabar, Jateng, DI Yogyakarta, Jatim, NTT, Kaltim, Kalsel, Sulut, Gorontalo, Sulteng, Sulsel, Sultra, Maluku Utara, Maluku, Irian Jaya
• To raise incomes, strengthen kecamatan and village government and community institutions and to build infrastructure through labor intensive methods.
• Menambah penghasilan, memperkuat pemerintah tingkat kecamatan dan pedesaan serta instansi-instansi masyarakat dan membangun infrastruktur melalui metode-metode padat karya.
Directorate General of Community Empowerment, Ministry of Home Affairs
Direktorat Jenderal Bina Pemberdayaan Masyarakat, Departemen Dalam Negeri
Second Kecamatan Development Project Loan 4627-IND/Credit 3537-IND Original Loan Amount: $208.9m. Original Credit Amount: $111.3m. Approval Date: 06/01 Closing Date: 12/06 World Bank Contact in Jakarta: Scott Guggenheim
All provinces except DKI Jakarta and Bali
Semua propinsi, kecuali DKI Jakarta dan Bali
• To support participatory planning and development management in villages. • To support a broad based construction program of social and economic infrastructure in poor villages. • To strengthen local formal and informal institutions by making them more inclusive, accountable, and effective at meeting villagers’ self-identified development needs. The project is a continuation of a longer-term participatory program for poverty alleviation that includes the two Village Infrastructure Projects and the first Kecamatan Development Project.
Page 34 of 36 pages
Project Data
(Data Proyek)
Areas of Coverage (Wilayah Executing Agency (Institusi
No. Pinjaman 4627-IND/ Kredit 3537-IND Pagu Awal Pinjaman: $208.9 juta Pagu Awal Kredit: $111.3 juta (IDA) Tanggal Persetujuan: Jun-01 Tanggal Akhir: Des-06 Kontak di Bank Dunia, Jakarta: Scott Guggenheim
54.
Project Objectives
Proyek)
(Tujuan Proyek)
Pelaksana)
Directorate General of Community Empowerment, Ministry of Home Affairs
Direktorat Jenderal Bina Pemberdayaan Masyarakat, Departemen Dalam Negeri
• Mendukung rencana partisipasi dan manajemen pembangunan di pedesaan. • Mendukung program konstruksi yang luas untuk infrastruktur sosial dan ekonomi di pedesaan miskin. • Memperkokoh institusi lokal baik formal dan informal dengan menjadikan mereka lebih terlibat, bertanggung jawab, dan efektif dalam memenuhi kebutuhan pembangunan desa yang diidentifikasi sendiri. Proyek ini adalah kelanjutan dari program partisipasi dalam jangka yang lebih panjang dalam mengurangi kemiskinan, dimana termasuk dua proyek infrastruktur pedesaan dan Proyek Pengembangan Kecamatan pertama.
Ozone Depleting Substance Phase Out Investment TF-021982 Original Grant Amount: $27m. Approval Date: 11/94 Closing Date: 12/01 World Bank Contact in Jakarta: Thomas Walton
National
No. Hibah TF-021982 Pagu Awal Hibah: $27 juta Tanggal Persetujuan: Tanggal Akhir: Des-01 Kontak di Bank Dunia, Jakarta: Thomas Walton
Menteri Negara Lingkungan Hidup
Nasional
• To support the government of Indonesia’s proposed program to phase out Ozone Depleting Substance (ODS).
• Menunjang program Pemerintah Indonesia untuk penghapusan ODS secara bertahap.
State Minister of Environment
Page 35 of 36 pages
PROVINCIAL COVERAGE OF WORLD BANK FINANCED PROJECTS
C. Irian Jaya
E. Irian Jaya
27
28
29
30
31
32
S.Sulawesi
S.E.Sulawesi
Maluku Utara
Maluku
W. Irian Jaya
C. Irian Jaya
E. Irian Jaya
W. Irian Jaya
Maluku Utara
26
C.Sulawesi
Maluku
S.E.Sulawesi
25
Gorontalo
S.Sulawesi
24
N.Sulawesi
C.Sulawesi
23
E.Kalimantan
Gorontalo
22
S.Kalimantan
N.Sulawesi
21
C.Kalimantan
E.Kalimantan
20
W. Kalimantan
S.Kalimantan
19
E. Nusa Tenggara
C.Kalimantan
18
W.Nusa Tenggara
W. Kalimantan
17
Bali
E. Nusa Tenggara
16
E.Java
W.Nusa Tenggara
15
DI Jogja
Bali
DI Jogja 14
E.Java
C.Java 13
C.Java
W.java 12
W.java
Banten 11
Banten
DKI Jakarta 10
DKI Jakarta
Bangka + Belitung 9
Bangka + Belitung
Lampung 8
Lampung
S.Sumatra 7
S.Sumatra
Bengkulu 6
Bengkulu
Jambi
W.Sumatra
5
Riau
N.Sumatra
DI Aceh
Jambi
No.
4
52 53 54
W.Sumatra
51
3
47 48 49 50
2
45 46
Riau
36 37 38 39 40 41 42 43 44
N.Sumatra
32 33 34 35
Project Name
1
13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
FY Sector
RURAL DEV. & NATURAL RESOURCES Ln.3742 94 RD Dam Safety Project Ln.3762 94 RD Java Irrig.Imp. & Water Management Ln.3792 95 RD Land Administration Ln.3886 95 RD Agr. Research Management II Ln.3984 96 RD Nusa Tenggara Agric. Area Dev't. Ln.4007 96 RD Sulawesi Agric. Area Development Ln.4008/+GEF 96 RD Kerinci Seblat ICDP Ln.4290 98 RD Bengkulu Regional Development Ln.4305/+GEF 98 RD Coral Reef Rehab. & Management Ln.4469 99 RD Water Resources Sector Adj. Loan Ln.4510/Cr. 3280 00 RD Decentralized Agr. & Forestry Ext. TF-23957 0 RD GEF-Biodiversity Strategy & Action Plan HUMAN DEVELOPMENT Cr. 3381 00 HD Provincial Health Project Cr. 3382 00 HD WSSLIC II Ln. 4456/Cr.3189 99 HD Sumatra Basic Education Ln.3825 95 HD Professional HRD II Ln.3887 95 HD Book & Reading Development Ln.3979 96 HD Secondary School Teachers Dev't Ln.4042 96 HD E.Java & NTT Jr. Secondary Educ. Ln.4043 96 HD Higher Education Support-DUE Ln.4062 97 HD Central Indonesia Jr. Second. Educ. Ln.4095 97 HD Sumatera Jr. Second. Education Ln.4125 97 HD Intensified Iodine Def. Control Ln.4193 97 HD Quality of Undergraduate Educ. Ln.4207 98 HD Safe Motherhood Project Ln.4308 98 HD West Java Basic Education Ln.4374 99 HD Health V Ln.4378 99 HD Early Child Development Ln.4455/Cr. 3188 99 HD Sulawesi & E. Island Basic Educ. Ln.4629/Cr.3537 01 HD Provincial Health Project II Cr. 3526 01 HD Library Development Project TRANSPORT Ln.3712 94 TR Highway Sector Investment II Ln.4054 96 TR Strategic Urban Rd. Improv. Prog. Ln.4106 97 TR Railway Efficiency Project Ln.4307 98 TR Sumatra Region Roads URBAN DEVELOPMENT Cr.3210 99 UR Urban Poverty Ln. 4440 99 UR Municipal Innovation Ln.3749 94 UR Semarang-Surakarta Urban Dev. Ln.3854 95 UR Kalimantan Urban Development Ln.3913 95 UR Infrastructure Development TA II Ln.4017 96 UR East Java UDP II Ln.4105 97 UR Sulawesi Unban Dev't II Ln.4155 97 UR Bali Urban Infrastructure Project Ln.4612/TF. 01 UR Western Java Env. Mgt. Project ENERGY & MINING DEVELOPMENT Ln.3978 96 EG Power Transmission & Distrib. II TF-28488 97 RD GEF-Solar Home System Project PRIVATE SECTOR DEVELOPMENT Ln.3904 95 PS Telecommunication V Ln.3972 96 PS Industrial Techn. Dev't Project Ln.4244 98 PS Information Infrastructure Devel'nt Ln.4448 99 PS Corporate Restructuring TA FINANCIAL SECTOR DEVELOPMENT Ln.4194 97 FS BEPEKA Audit Modernization ENVIRONMENT & SOCIAL DEV. Ln.4330/Cr.3453 98 ES Kecamatan Development Project Ln.4627/Cr.3535 01 ES Kecamatan Development Project II TF-21982 95 ES OTF-ODS Phase Out Investment
Credit/Loan
FY Sector
Project Name
NATIONAL
1 2 3 4 5 6 7 8 9 10 11 12
Credit/Loan
DI Aceh
No.
NATIONAL
06-Nov-01
Page 36 of 36 pages