Radomíra RadomíraPlíšková: Plíšková: Bicycle Bicyclepolicy policyaudits auditsin inCzech Czechregions regions
Cycling policy as a process
Bicycle policy audits in the Czech Republic •
BYPAD +
4 Czech cities – Olomouc, Pardubice, Ostrava, České Budějovice, + 2 cities – Vsetín, Plzeň
•
BYPAD Platform 7 regions planned to be audited, 3 of them already audited – Olomouc region, České Budějovice region, Zlín region
National cycling policy context • • • • •
National Cycling Strategy – coordination of regional and local actors Stimulating the regional and local cycling strategies BYPAD – a good monitoring tool for the reagional and local levels BYPAD audits speak for themselves, demonstrate the will of actors BYPAD topics fit into the overall needs for development of cycling
Bicycle policy audits - communication • • • • • •
Presentations of BYPAD scheme Creation of BYPAD group in the region (3 politicians, 3 officials, 3 users) Meeting with the group – local context, questionnaire Assesssment, scoring Meeting with the group – consensus, common reccommendations Final presentation – drawing the action plan
BYPAD Certification
Module 1 – User needs Question 1 – How does the reg.council reflect the real needs of local governments?
Olomouc region – database of problematic stretches for cycling (construction of separated cycle paths)
Czech Republic – more than 30 large cycling projects prepared for applying for EU Structural Funding (ROP),
Module 1 – User needs Umístění komunikace pro cyklisty: Začátek úseku: •začátek katastru obce •obec (ulice) •místo nebo objekt
Konec úseku: •obec (ulice) •místo nebo objekt •konec katastru obce
Kunštát, p.č. 530, konec ulice Palacké u RD č.p. 399
Újezd, odbočovací komunikace p.č. 113 a 117/3
Typ plánované komunikace včetně šířky (v m): stezka pro cyklisty – C8 stezka pro chodce a cyklisty se sloučeným provozem – C9 stezka pro chodce a cyklisty s rozděleným provozem – C10
C9 - 2,5m
Délka úseku [m]:
realizova ný
0
plánovan ý
Fáze přípravy včetně časového určení •územního rozhodnutí - ÚR •stavebního povolení - SP •ohlášení - OH •v provozu - PROVOZ
Odhad nákladů [milióny Kč]
526
Pořízeno ÚR
2,2
10 mil. Kč
Blansko, severní cíp Sportovního ostrova
Blansko, nádraží ČAD
C8, C9 - 3m
0
2052
19.4.2007 vydáno územní rozhodnutí SP – předpoklad do 30.8.2007 část Poříčí (levý břeh Svitavy)– zahájeno ÚŘ
Hodonín
Rohatec
C8 – 3m
0
1650 m
ÚR – do 11 / 2007, SP 02/2008
5 mil
Hodonín
Dubňany
C8 – 3m
0
4450 m
ÚR – do 11/2007, SP 02/2008
12 mil
Hodonín
Dolní Bojanovice
C8 – 3m
0
3000 m
ÚR – do 09 / 2007, SP 02/2008
13 mil
Hodonín
Lužice
C8 – 3m
0
1700 m
ÚR – do 11 / 2007, SP 02/2008
6 mil
Hodonín
Ratíškovice
C8 – 3m
0
4900 m
ÚR – do 11 / 2007, SP 02/2008
15 mil
Dolní Bojanovice
Starý Poddvorov
C8 – 3m
0
3000 m
ÚR – do 11 / 2007, SP 02 / 2008
13 mil
Example from the database of planned cycle paths in the cities of South Moravia
Module 1 – User needs Question 2: How does the reg.council treats the real needs of cyclists? číslo
zapsáno
změna
zanesl
úprava
SO
ulice
úsek z
úsek do
cyklotras
1
30.09.05
30.09.05
Prousek
doplnění SDZ
1
Maiselova
Široká
Břehová
A 25
1
nábřeží kpt. Jaroše
nájezd na stoupání
na Letnou
?
2
30.09.05
04.09.06
Prousek
zkosení obrubníku, úprava zábradlí, úprava SDZ
3
30.09.05
30.09.05
Prousek
doplnění VDZ a SDZ
7
Ovenecká
Veletržní
vjezd do Stromovky
A 155
4
30.09.05
30.09.05
Prousek
zkosení obrubníků
7
Ovenecká
U Studánky
vjezd do Stromovky
A 155
5
d
30.09.05
30.09.05
Prousek
doplnění VDZ a SDZ
7
cesta ve Stromovce
křižovatka
Za Císařským mlýnem
A1
5
a
30.09.05
30.09.05
Prousek
doplnění VDZ a SDZ
7
cesta ve Stromovce
Nad Královskou oborou
Výstaviště
A 16
5
b
30.09.05
30.09.05
Prousek
doplnění VDZ a SDZ
7
cesta ve Stromovce
Výstaviště
křižovatka
A 161
Example of classifying and evaluating of suggestions from users - Praha
Module 2 – Leadership Question 3 – What is the impact of key people (politicians and officials) for decision-making within the cycling policy?
Region of South Bohemia – the regional governor - Jan Zahradník and the reg. councillor - František Štangl, great promoters of cycling in the region
28.11.2005 – festive opening of 15 km long cycle path – all the mayors along the path participated, Zlín region
Module 2 – Leadership Question 4: What internal groups exist? Question 5: How is the coordination with external partners organised ?
The Reg.Council of South Bohemia region and the municipalities founded the Cycle paths of South Bohemia Foundation, helps to coordinate the cycling plans of municipalities, in accord with the Regional Plan for Construction of Cycling Infrastructure.
Module 2 – Leadership Question 5: How is the coordination with external partners organised ?
18.5.2007, 9:00 Velké Karlovice, „symbolic start“ launching of preparation for EU Structural Funding, in the middle: the reg.councillor for transport – Zlín region, Ing. Hradecký
18.5.2007, 9:30 Velké Karlovice, Symbolic signing of the Memorandum on support of cycling between Zlín regional council and micro-regions
Module 3 – Policy on paper Question 6 – What is the content of the regional cycling policy?
Ilustrative foto: Schade, U., Stadt Freiburg im Breisgau - Tiefbauamt (Germany)
Module 3 – Policy on paper Question 7: Jhow does the regional council verifies that the measures planned in the reg.cycling policy are also realised in practice ? Need for improvement – several Czech regions have strategic cycling policies, but some concrete measures are not realised yet 4.1.4.9
Public relations for cycling
Recommendation BYPAD: promotion campaign on benefits of cycling should be spread. Include it also during the European Mobility Week 16.-22.9. – support of cycling, walking and public transport Nositel: OŘTÚ MMP / SVSMP
rozpočet
Čas plnění: Průběžně
režie
Celkové náklady: součást akce
nesp.
Ostatní
služby
investice
Module 4 – Financing and personnel Question 8 – How is managed financing of cycling ?
Example of Olomouc region – construction of cycle paths (safety) Diversion of cyclists from the road I/46 Šternberk – Štarnov
Module 4 – Financing and personnel Question 8 – How financing of cycling is managed ?
Example of Hradec Králové region – construction of cycle paths – safety Diversion of cyclists from the road I/11 Třebechovice n.O. – Kostelec nad Orlicí
Module 4 – Financing and personnel Question 8 – How financing of cycling is managed ?
Kyselka
Velichov The example - building cyclepaths - the Karlovy Vary region - the long cycle route „Cycleroute along the river Ohře“
Module 4 – Financing and personnel Question 8 – How financing of cycling is managed ?
The example from the Pardubice region - building multifunctional routes in the valleys of the rivers Tichá Orlice a Třebovka
Module 4 – Financing and personnel Question 8 – How financing of cycling is managed ?
Systém of cycle lines for cycle buses
Cyklobuses in Šumava
The example of long-time investment of the South Bohemia region into the project „CYCLETRANS“
Module 4 – Financing and personnel Question 8 – How financing of cycling is managed ? The large reserves of regions: for example – to support measures for intermodality (Bike and Ride)
Question 9: By whom is the cycling policy prepared and implemented?
Module 5 – Regional Road Authority Question 10: What is being done to make cycling along regional roads safer, quicker and more comfortable? Question 11: How is the maintenance of the cycling infrastructure organised? Difficult to evaluate the situation in Czech regions – the Reg. Road Authority does not have the competence to maintain cycle paths. But for ex. the Olomouc region maintains signposting of on-road cycle routes and while road construction works includes cycling measures (Šumperk, reconstructed regional road)
Module 6 – Cycle tourism and recreation cycling Kraj
Question 12: How extensive is the touristrecreational bicycle route network?
Středočeský a Praha
Cyklotrasy IV. třídy (km) 3 294,5
Jihočeský
4 352
Plzeňský
3 010
Karlovarský
834,5
Ústecký
1 294
Liberecký
1 054
Královehradecký
1 377,5
Pardubický
2 803,5
Vysočina
2 157,5
Jihomoravský
2 124,5
Olomoucký
1 593
Moravskoslezský
2 128
Zlínský
1 213
Module 6 – Tourist and recreational cycling Question 13: What is the quality of the tourist-recreational bicycle route network ? Yes, we have a dense cycle network – the quality?
Bad quality field stretches
More than 50% on road Better quality needed !!!
Module 6 – Tourist and recreational cycling Question 13: What is the quality of the tourist-recreational bicycle route network ? National Cycling Conference 15.-19.5.2007 Zlín region 18.-19.5.2007 cycling tour (180 km) – the best
Cycle path along Baťa´s canal - separated
Cycle path Velehrad – Staré Město - qood quality field routes
THIS IS A GOOD WAY !
Module 6 – Tourist and recreational cycling Question 14:¨What is being done to help cyclists to know where they are going (or to give cyclists clear directions)?
We signpost everywhere – sometimes exagerated
Module 6 – Tourist and recreational cycling Question 14:¨What is being done to help cyclists to know where they are going (or to give cyclists clear directions)?
GIS in Pardubice region
Module 6 – Tourist and recreational cycling Question 15: What is being done to promote the use of the tourist cycling routes?
Module 6 – Tourist and recreational cycling Question 15: What is being done to promote the use of the tourist cycling routes? Example: Discover the Olomouc region by bicycle
• Special info portal www.kolmo.cz events, schedule, links for micro-regional webs, articles, photogallery • Posters, leaflets • Mass media
Module 6 – Tourist and recreational cycling Question 15: What is being done to promote the use of the tourist cycling routes? Support of Greenways in South Moravia
Theme trail and 10 circuits
Module 6 – Tourist and recreational cycling Question 15: What is being done to promote the use of the tourist cycling routes? Support of Greenways – region of South Moravia
Product logos in the graphic systém
Module 7 – Support of local cycling policy and partnership Question 16: What support is given to making the bicycle infrastructure real – ie. bringing it from a policy objective to really making it happen on the ground? Example : Region of Usti nad Labem, marketing study on cycle tourism
Module 7 – Supporting local cycling policy and partnerships Question 16: What support is given to making the bicycle infrastructure real – ie. bringing it from a policy objective to really making it happen on the ground? Example: region of Ústí nad Labem - marketing study
č. 2
Název cyklotrasy
Délka v km
Cena v Kč bez DPH
Cena v Kč 19% DPH
vč.
Labská cyklostezka
55,82
247 592 593,58
294 635 186,36
Krušnohorská magistrála
26,44
108 045 075,68
128 573 640,06
204
Cyklostezka podél řeky Ohře
143,5
599 222 772,58
713 075 099,36
251
Cyklostezka po břehu řeky Ploučnice
16,2
70 443 066,69
83 827 249,36
3080
Podbořanská spojka
62,2
167 717 120,61
199 583 373,52
3095
Podřipská trasa
11,45
50 852 792,83
60 514 823,46
3097
Úštěcko - Šluknovská trasa
45,7
889 913,82
1 058 997,44
395,51
1 245 329 019,16
1 481 941 532,80
23,36
Celkem
Module 7 – Supporting local cycling policy and partnerships Question 16: What support is given to making the bicycle infrastructure real – ie. bringing it from a policy objective to make it really happen on the ground?
Cycle corridors in Praha region
Module 7 – Supporting local cycling policy and partnerships Question 17: What support is given with regard to cycling-specific knowledge, advising and training? Consulting and education is organised mainly from the national level. Suggested: • The regions will organise their training in development of cycling, according to their local needs. • The regions will establish a special working group on implementation of the total cycle route network.
Module 7 – Supporting local cycling policy and partnerships Question 18: What is being done to co-ordinate or support local campaigns (ie. generally non-infrastructural measures)?
Let´s make cycling a positive political topic Foto: Jolicoeur,M. (Vélo Québec Association, Canada)
Module 7 – Supporting local cycling policy and partnerships Question 18: What is being done to co-ordinate or support local campaigns (ie. generally non-infrastructural measures)?
Example – how we can lose our health. Racioppi, F. (WHO European Center for Environment and Health Rome)
Module 7 – Supporting local cycling policy and partnerships Question 18: What is being done to co-ordinate or support local campaigns (ie. generally non-infrastructural measures)? Example – level 4, Safe routes to schools (Montpellier) : 350 bicycles / 600 pupils
Commitments between schools and regional (municipal) governments exist – for implementation of cycling measures, for ex. agreement between primary schools and the local governments (completion of cycle paths) and school entrances, preparation of school travel plans.
Module 8 – Land-use and mobility Question 19: In what way is the current land-use planning supporting the cycling policy ?
The land use planning and strategic documents integrate all modes of transport, but mainly on the level of „policy on paper“, than in concrete activities Example – Integrated transport system in South Moravia Region
Module 8 – Land-use and mobility Question 19: In what way is the current land-use planning supporting the cycling policy ? In CR – the level 2 is max. by now, reccomendations to revitalise the railway stations and integrate all modes of transport (example Nordhein-Westfalen, Germany)
Nordrhein-Westfalen, Germany: Programme ‚100 cycle stations‘ at railway stations
Module 8 – Land-use and mobility Question 19: In what way is the current land-use planning supporting the cycling policy ? Další inspirativní příklad
Leiden: new underground bicycle parking – 2000pls
Module 8 – Land-use and mobility Question 19: In what way is the current land-use planning supporting the cycling policy ? Bicycle traffic as a system
Source: Nationaler Radverkehrsplan 2002-2012 FahrRad!
Tax office Corporate Identity
Reward system by the retail trader
City hall
Repair Mobile Service
Infrastructure
Accomodation guard
Mobility center
bike rental outlet Bicycle guard
Velo courier
Safe-deposit boxes
ADFC VCD Bicycle station
Gas stations with -Service Washing plant
Company bikes and maintenance service
Luggage service + Delivery service
compensation for travelling Road administration Care Clearance
Business bicycles Fa. Data-Com
Sales – Leasing – Rental outlet - Maintenance
Zdroj: Technische Universität Dresden Verkehrs- und Infrastrukturplanung (vip)Prof. Dr.-Ing. Gerd-Axel Ahrens
Module 8 – Land-use and mobility Question 19: In what way is the current land-use planning supporting the cycling policy ?
Cycling in land use and transport planning, up to 5 km the bicycle is as fast as the car (cycling is free of congestions etc.)
Module 9 – Evaluation and effect Example : regular monitoring of cycle traffic in South Bohemia Region Úsek
cyklisté
bruslaři
pěší
ostatní
Celkem
KČT č. 12
České Budějovice – Hluboká nad Vltavou (6.7.2005)
1 235
313
102
1
1 651
KČT č. 12
Hluboká nad Vltavou – České Budějovice (7.7.2005)
1 150
313
87
3
1 553
U Krumlovského mostu – České Budějovice
636
3
241
1
881
KČT č. 33
Nová Pec – Stožec (17.7.2005)
442
23
127
10
602
KČT č. 33
Nová Pec – Stožec (18.7.2005)
418
13
105
5
541
KČT č. 33
Nová Pec – Horní Planá (17.7.2005)
532
10
125
11
678
KČT č. 34
Frymburk – Lipno nad Vltavou (3.7.2005)
440
0
458
2
900
KČT č. 34
Lipno nad Vltavou – Frymburk (4.7.2005)
373
3
368
0
744
Trasa
KČT č. 1018
Module 9 – Evaluation and effect Question 21: How does the region collect and use safety-related data? Příčiny dopravních nehod s cyklisty (v období od 1.1.1990 do 31.12.1999) celkem nehod 300 nehody zaviněné cyklisty
počet nehod
250
nehody zaviněné ostatními účastníky provozu
200 150 100 50
nesprávná strana
předjíždění
jiné
rychlost
alkohol
nepozornost
způsob jízdy
přednost
0
příčina nehody
Similar situation in the whole country (just the level 1): The reg.governments have the analysis of accident rates (Police, statistic data).
Module 9 – Evaluation and effect Question 22: How is information about the development and improvement of local bicycle policy collected and used? Podíl cyklistické dopravy na dělbě přepravní práce, Olomoucký kraj TOP10 45% 42% 40% 36% 35% 30%
30%
25% 22% 20%
20%
20% 17% 15%
15%
14%
13%
10%
5%
0% Uničov
Litovel
Prostějov
Kojetín
Šumperk
Přerov
Mohelnice
Lipník nad Bečvou
Hranice
Šternberk
Selected positive factors : – The interest of tourists and local citizens in cycling is increasing (cycle transport, cycle tourism), healthy life style – Good supply of interesting destinations – natural and cultural heritage – Local governments interested – Existence of a dense network of routes suitable for cycling – Dense network of signposted local cycle routes, plans for development exist (planned cycle plans in urban and rural areas) – Cooperation with public transport operators, railways and bus companies for intermodality with cycling
Selected negative factors: • Bad surface quality of some cycle routes • Missing or damaged cycle signs • Lack of space for construction of separated cycle paths in cities and municipalities • Lack of financing • Additional services to be completed – bicycle rentals and repair services, catering and accommodation in small municipalities, cycling equipment needed etc. • High intensity of car traffic in big cities