Company Profile
PT TRI STAR TECQ ENGINEERING , PROCUREMENT, CONSTRUCTION, INSTALLATION AND SERVICES
Head Office : Sentralsari RT 002 RW IV Kec Toili, Kab Banggai Sulawesi Tengah (94763) CP
: +62 8131 1553 750 (Reza Prasetia) +62 8526 3002 580 (Nofronal)
Branch Office :
+62 8121 2018 181 (Sugeng Purnomo)
Kp Buaran Utara RT 002 RW 001 Desa Lambangsari Kec Tambun Selatan
Telp/Fax : (021) 82654831
Kab Bekasi -Jawa Barat 17514
Email
(Grand Wisata Tambun)
Website : www.tristar-tecq.co.id
:
[email protected]
PT TRI STAR TECQ Engineering , Procurement , Construction Installation And Services
Office
OFFICE ADDRESS : Kp. Buaran Utara RT.002 RW. 001 Desa Lambangsari Kec. Tambun Selatan Kab. Bekasi—Jawa Barat (Grand Wisata— Tambun) Telp./Fax (021) 82654831 Email :
[email protected] Website : www.tristar-tecq.co.id
PT TRI STAR TECQ
About Us PT Tri Star TECQ is a Company which core business is in Engineering, Procurement, Construction, Installation And Services. Top management PT Tri Star TECQ will give priority to following Quality Management System, Standard Operational Procedure (SOP), safe working attitudes, professionals, and
good habits for all
employees. Employees PT Tri Star TECQ shall be have a strong motivation for achieving better productivity for High Performance. PT Tri Star TECQ has been assessed and found to conform to the requirements of : a. ISO 9001 : 2008 for Quality Management System b. ISO 14001 : 2004 for Enviromental Management System c. OHSAS 18001 : 2007 for Occupational Health And Safety Management System
PT TRI STAR TECQ
About Us Engineering PT Tri star TECQ have a capability for make a Design, Calculation And Analyze based on Code & Standard, client specification for the Oil, Gas, And Petrochemical Industries And Related Goverment Regulation. Construction PT Tri Star TECQ will finish the project on schedule from client.
PT Tri Star TECQ for productivity can
accomplish with material, capital and technology. Productivity is mainly an issue of personal manner, its in an attitude that we will continuity improved Quality PT Tri Star TECQ will keep the job according internationally accepted code & practices. QUALITY not only for reducing
Defect
but
has
become
for
TOTAL
QUALITY
MANAGEMENT SYSTEM. PT Tri Star TECQ will take the lead in emphasizing the roles all employees play in quality assurance. Includes identifying which quality standards are relevan to the project and how to satisfy those standards. Incorporating quality standards into project design And make a traceability system.
PT TRI STAR TECQ
About Us Health, Safety, and the Environment (HSE) PT TRI STAR TECQ commitment to the highest standards for the health and safety of our
employees
and
customers
and
also
protection
of
the
environment in the communities in which we live and work. HSE Management System defines the principles by which we conduct our company.
PT TRI STAR TECQ
Visi & Misi
Vision: To Be a Leading And Profesional Company engaged in the Engineering , Procurement, Construction , Installation And Services
Mission: Managing Company by priority level of safety, security, and quality to increase customer satisfaction Provide optimum added value to society and the environment Project finished with effectively , efficiently and Professional
PT TRI STAR TECQ
Commited to your project success
Project Execution Strategy
PT Tri Star TECQ
Will finishing your project on
schedule and based on Contract with Quality And HSE System based on Code & Standard, client specification And Regulation. for the Oil, Gas, And Petrochemical Industries And Related Goverment Regulation.
PT TRI STAR TECQ
Services PT TRI STAR TECQ
ENGINEERING
Basic Design engineering, Detail Engineering and Drawing
Mechanical and Piping System (Static and rotating Equipment) Calculation And Design
Calculation & Pipe Stress Analyses For Piping And Pipeline
System Design, cost estimation, review and optimization
Developed Mechanical and piping Specification, Data Sheet and Material Take Off
PROCUREMENT
Electrode AWS E7010-P1, size : Dia 3,2 mm, Dia 4.0 mm, Dia 4,8 mm
Welding Tools And Consumable
HSS for Mainline Area And HDD Area (DIRAX ), Repair Patch , Epoxy ,Melt Stick
Canusa Onshore Wrapid Sleeve , installation and Equipment
Jotun
Pipe And Accessories
Hydrotest Equipment
Precomisioning & Comisioning tolls
CONSTRUCTION
Piping or Pipeline
Mechanical
Structure
Fabrication
Site Erection
Painting and Field Joint Coating
Concrete For Supporting Pipe
Horizontal Directional Drilling (HDD)
Trust Boring
Auger Boring
PT TRI STAR TECQ
Services PT TRI STAR TECQ
CONSTRUCTION
Civil Work (highways, bridges, buildings)
Electrical and Instrument
Perform data processing with engineering in reporting the results of the work order
Conducting joint surveyors, with the main contractor before and after the work is done
SURVEY
Determine of Center Line Based on Alignment Sheet Drawing
Operating Total Station, Auto Level, Geodetic GPS
Review Data Survey Report
Perform installation and Determination Center Line Pipe Bending pipe along the pipeline area
Mapping Area
Pre-Comisioning And Commisioning
Cleaning
Hydrostatic Test
Dewatering
Swabbing
Drying
Nitrogen Purging
Commisioning
Tightening
PT TRI STAR TECQ
Services PT TRI STAR TECQ
Project Management And Technical Support Project Management Planning And Schedulling Plant Operations and maintenance Quality Assurance And Control Quality HSE Management System
PT TRI STAR TECQ
List Experience Company PT TRI STAR TECQ
No
Description
Main Contractor
Client
Year
1
Integrated Agro—Industrial Farm Sukabumi Jawa Barat
PT Tri Esamokan Jaya PT Simboel Jagaabaya On Going
2
Intallation Catodic Protection
PT Rekayasa Industri
PT Pertamina Gas
On Going
3
Pekerjaan Pembangunan Pipa Pendukung SPBG Bekasi (Structure)
PT Rekayasa Industri
PT Pertamina Gas
On Going
4
Pekerjaan Pembangunan Pipa Pendukung SPBG Bekasi (Fabrication & PT Rekayasa Industri Installation of Above Ground Piping)
PT Pertamina Gas
On Going
5
Survey and Engineering "Project Pengembangan Gas Matindok (PPGM) Pembangunan Fasilitas Produksi Gas Donggi" Sales Gas Trunkline 16 Inch
PT Lagawico Pratama
PT Pertamina EP
20142016
6
Pipeline & Horizontal Directional Drilling ( HDD ) Dia 12 Inch And 16 Inch Medan Project “Pekerjaan Horizontal Directional Drilling Pipa Gas Belawan KIM—KEK ”
PT Farrel Internusa Pratama
PT Pertamina Gas
20152016
7
Tie In string HDD To Mainline Medan Project “Pekerjaan Horizontal Directional Drilling Pipa Gas Belawan KIM—KEK ”
PT Farrel Internusa Pratama
PT Pertamina Gas
2016
8
Hydrotest Test Package Senoro And Flowline Project Pengembangan PT Eptco Dian Persada Gas Matindok (PPGM) Pembangunan Fasilitas Produksi Gas Donggi"
PT Pertamina EP
20152016
9
HDD Project dan bore pile ( Angkur Bore Project)
CV Geotech Mandiri
PT Waskita Beton Precast
2016
Pipeline Dia 14 Inch Semarang Project " Pekerjaan Pemasangan Pipa 10 Offshore Dan Onshore Sehubungan Dengan Pembangunan Jaringan Pipa Transmisi Gas Bumi Kalija 1 Ruas Kepodang-Tambak Lorok “
PT Mulia Tehnik Toolsindo
PT PGN Solution
2015
Preparation, Excavation, Backfill And Anode Installation Project " Pekerjaan Pemasangan Pipa Offshore Dan Onshore Sehubungan 11 Dengan Pembangunan Jaringan Pipa Transmisi Gas Bumi Kalija 1 Ruas Kepodang-Tambak Lorok “
PT Mulia Tehnik Toolsindo
PT PGN Solution
2015
PT TRI STAR TECQ PT TRI STAR TECQ
List Experience Company Main
Description
Client
Year
No
Contractor
Preparation And Joint Tie In Onshore to Nearshore Project " Pekerjaan 12 Pemasangan Pipa Offshore Dan Onshore Sehubungan Dengan Pembangunan Jaringan Pipa Transmisi Gas Bumi Kalija 1 Ruas Kepodang-Tambak Lorok “
PT Mulia Tehnik Toolsindo
PT PGN Solution
2015
Gauging Plate Project " Pekerjaan Pemasangan Pipa Offshore Dan Onshore 13 Sehubungan Dengan Pembangunan Jaringan Pipa Transmisi Gas Bumi Kalija 1 Ruas Kepodang-Tambak Lorok “
PT Mulia Tehnik Toolsindo
PT PGN Solution
2015
Slab Concrete Project " Pekerjaan Pemasangan Pipa Offshore Dan Onshore 14 Sehubungan Dengan Pembangunan Jaringan Pipa Transmisi Gas Bumi Kalija 1 Ruas Kepodang-Tambak Lorok “
PT Mulia Tehnik Toolsindo
PT PGN Solution
2015
Cathodic Protection Project " Pekerjaan Pemasangan Pipa Offshore Dan 15 Onshore Sehubungan Dengan Pembangunan Jaringan Pipa Transmisi Gas Bumi Kalija 1 Ruas Kepodang-Tambak Lorok “
PT Mulia Tehnik Toolsindo
PT PGN Solution
2015
Anchor Block Project " Pekerjaan Pemasangan Pipa Offshore Dan Onshore 16 Sehubungan Dengan Pembangunan Jaringan Pipa Transmisi Gas Bumi Kalija 1 Ruas Kepodang-Tambak Lorok “
PT Mulia Tehnik Toolsindo
PT PGN Solution
2015
17 Pembangunan Poned Kecamatan Margaasih PEMDA Bandung
-
Pemda
2015
16 Concrete core drill Senoro Gas Development Project Owner
PT Tripatra Engineers
Pertamina Medco
20142015
17 Pembuatan Core Drill Beam Bare Senoro Gas Development Project
PT Tripatra Engineers
Pertamina Medco
20142015
PT TRI STAR TECQ
EXPERIENCE PT TRI STAR TECQ
Survey & Engineering
1. Survey & Engineering Project “Pengembangan
Gas Matindok (PPGM)
Pembangunan Fasilitas Produksi Gas Donggi” Sales Gas Trunkline 16 Inch PT LAGAWICO PRATAMA, Main Contractor PT REKAYASA INDUSTRI Toili, Banggai Sulawesi Tengah For Polygon BM, Stack-out, Topografi, Survey Centerline, Determine of Pipe Bending, Trenching, Lowering, Backfilling, Pre-Construction Drawing And As-Built Drawing. 2. Survey & Engineering Project Dia 14 Inch Kepodang Tambak Lorok-Semarang Project “Pembangunan dan Pengoperasian Ruas Transmisi Kalimantan Jawa (KALIJA) 1 Kepodang Tambak Lorok” Owner PT Perusahaan Gas Negara (PGN) PT Bakrie Tbk
For Polygon BM, Stack-out, Topografi, Survey Centerline,
Determine of Pipe Bending, Trenching, Lowering, Backfilling, Pre-Construction Drawing And As-Built Drawing. 3. Survey & Engineering Pipeline Dia 12 Inch And 16 Inch Medan Project “Kontrak On Call Basic Pekerjaan Horizontal Directional Drilling Pipa Gas Belawan KIM— KEK
Medan” Owner PT PERTAMINA GAS
PRATAMA, Main Contractor PT
REKAYASA INDUSTRI Toili, Banggai Sulawesi Tengah For Polygon BM, Stack-
PT TRI STAR TECQ
EXPERIENCE PT TRI STAR TECQ
Pipeline
I. Stringing, Trenching, Welding Work, Field Joint Coating, Lowering, Non Destructive Examination, Holiday Test, And Hydrotest for Pipeline Dia 14 Inch Kepodang Tambak Lorok - Semarang
Project “Pembangunan dan Pengoperasian Ruas Transmisi
Kalimantan Jawa (KALIJA) 1 Kepodang Tambak Lorok” Owner PT Perusahaan Gas Negara (PGN) - PT Bakrie Tbk.
II. Stringing, Welding Work, Field Joint Coating, Lowering, Non Destructive Examination, and Holiday Test For Pipeline Dia 12 Inch And 16 Inch Medan Project “Tie In String HDD To Mainline for Pekerjaan Horizontal Directional Drilling Pipa Gas Belawan KIM KEK Medan” Owner PT PERTAMINA GAS
PT TRI STAR TECQ
EXPERIENCE PT TRI STAR TECQ
Piping
Fabrication & Installation of Above Ground Piping Project Owner Kementrian ESDM & PT Pertamina Contractor PT Rekayara Industri Pembangunan Pipa Pendukung SPBG Bekasi ”
PT TRI STAR TECQ
EXPERIENCE PT TRI STAR TECQ
Pipeline Tie In Work
I. Welding Joint Tie in Mainline to HDD for Pipeline Dia 12 Inch And 16 Inch Medan Project “Tie In String HDD To Mainline for Pekerjaan Horizontal Directional Drilling Pipa Gas Belawan KIM - KEK Medan” Owner PT PERTAMINA GAS .
II. Welding Joint Tie in On - shore to Off - shore Pipeline Dia 14 Inch Kepodang Tambak Lorok - Semarang
Project “Pembangunan dan Pengoperasian Ruas Transmisi
Kalimantan Jawa (KALIJA) 1 Kepodang Tambak Lorok” Owner PT Perusahaan Gas Negara (PGN) - PT Bakrie Tbk.
PT TRI STAR TECQ
EXPERIENCE PT TRI STAR TECQ
HDD (Horizontal Directional Drilling)
I. HDD (Horizontal Directional Drilling) Pipeline Dia 12 Inch And 16 Inch Medan Project “Kontrak On Call Basic Pekerjaan Horizontal Directional Drilling Pipa Gas Belawan KIM - KEK Medan” Owner PT PERTAMINA GAS
II. HDD (Horizontal Directional Drilling) Pipeline Dia 14 Inch Kepodang Tambak Lorok - Semarang
Project “Pembangunan dan Pengoperasian Ruas Transmisi
Kalimantan Jawa (KALIJA) 1 Kepodang Tambak Lorok” Owner PT Perusahaan Gas Negara (PGN) - PT Bakrie Tbk.
PT TRI STAR TECQ
EXPERIENCE PT TRI STAR TECQ
HDD Project dan bore pile (Angkur Bore Project).
HDD Project dan bore pile ( Angkur Bore Project) PT Waskita Beton Precast
PT TRI STAR TECQ PT TRI STAR TECQ
EXPERIENCE Painting, And Sandblasting
Painting & Sandblasting Project Owner Kementrian ESDM & PT Pertamina Contractor PT Rekayara Industri Pembangunan Pipa Pendukung SPBG Bekasi ”
PT TRI STAR TECQ
PT TRI STAR TECQ
EXPERIENCE Anchor Block
Anchor Block Civil Work for Pipeline Dia 14 Inch Kepodang Tambak LorokSemarang Project “Pembangunan dan Pengoperasian Ruas Transmisi Kalimantan Jawa (KALIJA) 1 Kepodang Tambak Lorok” Owner PT Perusahaan Gas Negara (PGN) - PT Bakrie Tbk.
PT TRI STAR TECQ
EXPERIENCE PT TRI STAR TECQ
Steel Structure
Structure for Fabrication & Installation of Above Ground Piping Work. Contractor PT REKAYASA
INDUSTRI.
Owner
Kementrian
ESDM
Pembangunan Pipa Pendukung SPBG” Bekasi, Jawa Barat.
&
PT
Pertamina
“Pekerjaan
PT TRI STAR TECQ
EXPERIENCE PT TRI STAR TECQ
Coredrill & Substation
Coredrill Tangki Foundation And Coredrill Substation Bulding Project “Senoro Gas Development Project” Contractor PT TRIPATRA SAMSUNG CONSORTIUM, Banggai Sulawesi Tengah For Drilling, Installation And Installation Chemical.
PT TRI STAR TECQ
EXPERIENCE PT TRI STAR TECQ
I.
Cathodic
“Pembangunan Ruas
Transmisi
Electrical
Protection dan
Project
Pengoperasian
Kalimantan
Jawa
(KALIJA) 1 Kepodang Tambak Lorok” Owner PT Perusahaan Gas Negara (PGN) - PT Bakrie Tbk
I. Cathodic Protection Project Owner Kementrian ESDM & PT Pertamina Contractor PT Rekayara Industri Pembangunan Pipa Pendukung SPBG Bekasi ”
PT TRI STAR TECQ
EXPERIENCE PT TRI STAR TECQ
Pre-Comisioning
I. Hydrotest for Pipeline Dia 12 Inch And 16 Inch Medan Project “Kontrak On Call Basic Pekerjaan Horizontal Directional Drilling Pipa Gas Belawan KIM - KEK Medan” Owner PT PERTAMINA GAS.
II. Hydrotest for Oil And GAS Services for “Pekerjaan Hydrotest Test Package Senoro dan Flowline PPGM” Owner PT PERTAMINA E&P, Toili-Banggai, Sulawesi Tengah.
PT TRI STAR TECQ
EXPERIENCE
PT TRI STAR TECQ
Pre-Comisioning
III. Hydrotest for
Project " Pekerjaan Pemasangan Pipa Offshore Dan Onshore
Sehubungan Dengan Pembangunan Jaringan Pipa Transmisi Gas Bumi Kalija 1 Ruas KepodangTambak Lorok “ Owner PT PGN Solution
PT TRI STAR TECQ
EXPERIENCE PT TRI STAR TECQ
Reinstatement
Reinstatement Civil Work for Pipeline Dia 14 Inch Kepodang Tambak Lorok — Semarang
Project “Pembangunan dan Pengoperasian Ruas Transmisi Kalimantan
Jawa (KALIJA) 1 Kepodang Tambak Lorok” Owner PT Perusahaan Gas Negara (PGN) PT Bakrie Tbk.
PT TRI STAR TECQ
EXPERIENCE PT TRI STAR TECQ
Building
Perencanaan, Pengadaan, dan Pelaksanaan Pekerjaan Pembangunan PONED (PUSKESMAS) MARGAASIH Bandung untuk Pemerintah Daerah Bandung.
PT TRI STAR TECQ PT TRI STAR TECQ
Resources PT Tri Star TECQ have team with highly dedicated with great knowledge and supported the great team work. TECQ Services Include : 1) Project Reporting 2) Logistics Planning and Implementation 3) Technical back up services 4) Engineering Input 5) Quality HSE Management System 6) Safety Health And Enviroment
PT TRI STAR TECQ
PT TRI STAR TECQ
PT TRI STAR TECQ
PT TRI STAR TECQ
Equipment
Filling Pump
Filling Pump
PT TRI STAR TECQ
Equipment
compressor 750 CFM 12 BAR
PT TRI STAR TECQ
Equipment
Sand Pot
PT TRI STAR TECQ
Equipment
Auger Boring Machine
Horizontal Directional Drilling Machine
PT TRI STAR TECQ
Equipment
Deepwell Drilling