PT. DAHLIA BIRU COAL MINING BUSINESS ADDRESS : JL PANGLIMA SUDIRMAN 55, SURABAYA 60271, EAST JAVA, INDONESIA TELEPHONE : +62 31 5481 666, +62 31 7001 7652 FAX : +62 31 5481 555 EMAIL :
[email protected]
PT DAHLIA BIRU, established in 1990 owns a coal mining lease located within the administrative jurisdiction of South Barito Regency in Central Kalimantan Province. PT. DAHLIA BIRU currently holds an exploitation permit as well as a coal hauling and selling permit.
Vision Statement To be a world class coal mining company .
Mission Statement To provide most economical fuel for power generation namely steam coal for the domestic and international market by deploying most efficient and best mining practices by utilizing latest technologies available in the industry.
Values The JORC resources of PT. Dahlia Biru approximately 108 million tonnes of coal.
The optimized reserves of the Dahlia Biru’s coal project at approximately 85.6 million tonnes with the average stripping ratio of 3.07.
Growth Strategy PT. DAHLIA BIRU continually seek new resources for sustainable growth and its affiliated company owns a coal mining lease of 5,000 Ha.
Coal quality : 1. Total Moisture
: 62% (ar)
2. Inherent Moisture : 14% (adb)
3. Ash
: 6% (adb)
4. Volatile Matter
: 44% (adb)
5. Fixed Carbon
: 36% (adb)
6. Total Sulphur
: 0.2% (adb)
7. GCV
: 5270 kcal/kg (adb)
JORC Code Coal Resources from surface down to elevation – 50m on explored 1,105 Ha area :
Tonnage
Units
Measured
Indicated
Inferred
Subtotal
Million tonnes
57.3
50.7
48
108
Coal Reserves : 85,600,000 Tonnes
PLANNED COAL UP GRADING
Upgraded TM_20%
Upgraded TM_20%
Upgraded TM_20%
Surface Miners 2200 SM The Wirtgen 2200 SM is the “all-rounder” for soft and medium hard rock. The cut material is either loaded to the front via a large conveyor system consisting of primary and discharge conveyor or is windrowed behind the machine. With an operating weight of almost 53 short tons, the Surface Miner 2200 SM can achieve a cutting depth of 11 inches over a total width of 7.2 feet in soft to medium hard rock
PRODUCTIVITY: - Per Hour : 500 tonnes - Per Day : 20 hours X 500 MT = 10,000 tonnes - Per Year : 340 days X 10,000 MT = 3,400,000 tonnes Note: Per Hour = 384.6 MT X 1.3 = 500 tonnes
WIRTGEN 2200 SM Surface Miner
Mercedes Benz (Actros 4054 S/33) Specification :
Engine Power : 395 kW (537 HP) Wheelbase : 3300 mm Gross Vehicle Combination : 200 ton
PRODUCTIVITY (8 Units): Hauling distance Average speed loaded Average speed return Average speed Total cycle time Loading & unloading time Total cycle time Operating hours per day Cycles per day Average to Productivity per days: 8 trips X (91 MT X 2 Tandems)
: 26 Km : 30 Km/hr : 40 Km/hr : 35 Km/hr : 1.49 hr : 1 hr : 2.49 hr : 20 hr : 8.05 days : 8 trips X 8 Units = 11,648 MT
Location : Tamparak village, Dusun Utara sub district, Barito Selatan Regency, Central Kalimantan Province. Area of concession : 5,000 Ha Hauling road (Mines to jetty) : Distance : ± 26 Km Width : 40 m Stockpile and jetty area: ± 40 Ha The coal will be trasported via Barito river towards Taboneo Anchorage, distance 380 Km (205 nautical miles)
Keputusan Bupati Barito Selatan No. 527 Tahun 2009 tentang Persetujuan Kuasa Pertambangan Eksploitasi menjadi Izin Usaha Pertambangan Operasi Produksi kepada PT. Dahlia Biru (Production Operation Permit) for 19 years.
Keputusan Bupati Barito Selatan No. 316 Tahun 2011 tentang Pemberian Perpanjangan Izin Lokasi kepada PT. Dahlia Biru untuk Lokasi Terminal Khusus Batubara, Sarana Penunjang dan Infrastruktur Tambang beserta Jalan Tambang Batubara (Location, Hauling Road and Stockpile Permit).
Izin Prinsip MenHut No. S.491/Menhut-VII/2012 Tanggal: 18 Oktober 2012 Persetujuan Prinsip Penggunaan Kawasan Hutan untuk Kegiatan Operasi Produksi Batubara dan Sarana Penunjangnya Pada Kawasan Hutan Produksi Tetap dan Kawasan Hutan yang dapat dikonversi a/n PT. Dahlia Biru di Kab. Barito Selatan Prop. Kalimantan Tengah.
ORGANIZATIONAL STRUCTURE GENERAL MEETING OF SHAREHOLDERS
BOARD OF COMMISIONERS Alim Markus (President Commissioner) Iuneke Anggraini (Commissioner)
Henry J Gunawan PRESIDENT DIRECTOR
Bambang Raya Saputra DIRECTOR 1
David Gunawan DIRECTOR 2
Agus S Tjiptowardojo DIRECTOR 3
SHAREHOLDERS
PT. Permata Murni
PT. Permata Sumber Investindo
65 %
15 % PT. DAHLIA BIRU
PT. Bintang Harapan Desa
Alim Markus
10 %
10 %
AFFIRMATIVE ACTION INITIATIVES
To date some 1,105 Ha at the south eastern portion of this lease had been the subject of exploration activities involving outcrop mapping, borehole drilling, quality sampling. Data collected was validated, encoded for computer-aided design and processing, and correlated to come up with a seam geometry and quality model. The volume and quality of the data are found to be sufficient to allow a resources estimation compliant with the requirements of the JORC Code and the Australian Guidelines for Reporting and estimating Inventory Coal, Coal Resources and Coal Reserves.
PT. DAHLIA BIRU has completed land acquisition for stockpile and jetty measuring 40 Ha and 98 Ha for hauling road.