Future Coal Power Plant Development in Indonesia
I MADERO SAKYA
[email protected] Head of System Planning Division PT PLN (Persero)
Clean Coal Day – Tokyo 8 – 9 Sep 2014 1
PLN is a major integrated electric utility company in Indonesia
Generation
Transmission
Distribution
36,897 MW of installed 38,937 kmc of 777,962 kmc of capacity out which transmission lines distribution lines represents 83% of 77,514 MVA of 41,987 MVA of capacity in Indonesia transmission transformer transformer capacity capacity 54 millionscustomers,
with more than 15 millions using prepaid meter. 2
Generation Composition PLN controls 83% of Indonesia’s total installed generation portfolio of 46,245 MW Sumatera Hydro Geothermal Steam-turbine Combined Cycle
Sulawesi
Kalimantan 864 MW 110 MW 1,332 MW 858 MW
Hydro Steam-turbine
Gas-turbine
60 MW 179 MW
1,294 MW
Diesel
1,382 MW
Diesel
2,284 MW
Others
0 MW
0 MW
IPP
1,202 MW
Total
7,944 MW
IPP Total
Sumatera
80 MW
Steam-turbine
112 MW
Gas-turbine
183 MW
Diesel
948 MW
Others
3 MW
IPP
56 MW
INDONESIA
223 MW
Geothermal
266 MW
Combined Cycle
Gas-turbine Others
Hydro
32 MW
Papua Diesel
Hydro
266 MW
Hydro
6 MW
Total
Geothermal Steam-turbine
2,244 MW
1,975 MW
Maluku Kalimantan
Combined Cycle
8,814 MW
Gas-turbine
3,690 MW
Diesel
6,193 MW
Others
8 MW
IPP Total
Java-Bali
Hydro Geothermal
Steam-turbine
46,245MW
Diesel
295 MW
Others
1 MW
13,970 MW 7,896 MW
Gas turbine
2,034 MW
Others
NTT
375 MW
Combined Cycle Diesel
7,743MW
Maluku
NTB
2,392 MW
15,710 MW
Papua
Sulawesi
Java-Bali
568 MW
272 MW
695 MW
Total
3,519 MW
457 MW 1 MW
IPP
5,791 MW
Total
32,916MW
Total
296 MW
NTT NTB
Diesel
Steamturbine
30 MW
Diesel
324 MW
Hydro
1 MW
Others
Others
1 MW
Total
Total
237 MW
Geotherma l
3 MW
Hydro
1 MW 2 MW 243 MW
356 MW As of December 31, 2013
3
Demand Projection - 2013-2022
18 TWh
385 TWh
44 TWh
IT : 10,8% 26 TWh
66 TWh
Kalimantan: 10,7% Sulawesi: 10,8% Maluku: 10,9%
188 TWh
Sumatera: 10,6% Papua: 10% 385 144 TWh
275 TWh
Nusa Tenggara: 11,1%
JB : 7,6%
2013 2022
Indonesia: 8,4% Tahun
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
Kebutuhan (TWh)
189
207
226
246
266
287
310
334
359
386
Rasio Elektrifikasi ( % )
79.6
82.6
85.9
88.9
91.9
93.7
95.3
96.8
97.4
97.8
4
New Power Plant Capacity Addition (Incl. IPP)
• Total additional capacity until 2022 is around 60 GW..
Additional capacity : CFPP : 38 GW (63%) GeoPP: 6 GW ( 10 % )
CCGT :5 GW (8 % ) GT/Gas Engine : 4 GW ( 7 % ) Hidro/Mini Hidro : 6 GW ( 10 % ) Others : 1 GW ( 1 % ) 5
Indonesian Electricity Energy Mixed 2013 -2022
214 683 GWh
437 207 GWh 6
UNIT SIZE OF COAL POWER PLANT
7
Expansion Plan for Java Bali System PLTU Jawa-7 #1: 1.000 MW (2019) #2: 1.000 MW (2020)
PLTU Jawa-5 & 6 #1: 1.000 MW (2018) #2: 1.000 MW (2019) #3: 1.000 MW (2021) #4: 1.000 MW (2021)
PLTU Indramayu #4: 1.000 MW (2022) #5: 1.000 MW (2022)
PLTU Jawa-1 #2: 1.000 MW (2018)
PLTU Jawa-3 #1: 660 MW (2019) #2: 660 MW (2020) PLTU Jawa-4 #5: 1.000 MW (2019) #6: 1.000 MW (2020)
SURALAYA
NEW SURALAYA SURALAYA CILEGON HVDC
HVDC BANTEN
M.KARANG PRIOK M.TAWAR DURIKOSAMBI KEMBANGAN CIBATU-2 BEKASI NEW BLRJA CAWANG TAMBUN LENGKONG GANDUL CAWANG-2 CIBATU CIBINONG BOGOR-X DEPOK
CISOKAN
INDRAMAYU
PLTU Jawa Tengah #1: 1.000 MW (2018) #2: 1.000 MW (2019)
T.JATI B
CIRATA JAWA-1 UJUNGBERUNG SAGULING MANDIRANCAN BANDUNG SELATAN CIGERELENG
JAWA-3 PEMALANG JATENG
GRESIK T.JATI A
MATENGGENG KESUGIHAN /RAWALO CILACAP ADIPALA
NGIMBANG
UNGARAN
KRIAN
TASIKMALAYA
PLTU Banten #1: 625 MW (2016)
Upper Cisokan PS #1: 260 MW (2017) #2: 260 MW (2017) #3: 260 MW (2017) #4: 260 MW (2017)
Matenggeng PS #1: 225 MW (2020) #2: 225 MW (2020) #3: 225 MW (2021) #4: 225 MW (2021)
GITET 500 kV eksisting
GITET 500 kV rencana
Kit 500 kV eksisting
Kit 500 kV rencana
SUTET eksisting
SUTET rencana
PEDAN BANTUL
PLTGU Jawa-1 #4: 750 MW (2017)
TANDES SURABAYA SELATAN GRATI
BANGIL KEDIRI
PAITON
KAPAL
PLTU Cilacap #3: 600 MW (2016)
PLTU Adipala #1: 660 MW (2014)
AMPLA
PLTGU Jawa-2 #3: 750 MW (2018)
8
Sumatera Jawa HVDC Interconnection
9
Expansion Plan for Sumatera Sigli
Banda Aceh
Samalanga
Jantho
Bireun
C. Trueng Lhokseumawe
G
P. Labu
P Seulawah
Idie Tualang Cut
Takengon
PLTP Seulawah 110 MW-2021/22
A Meulaboh
U
PLTU Meulaboh
PLTU Langsa
Blangkjeren
Peusangan1-2 HEPP
P. Brandan
Binjai Lawe Mamas HEPP
A
Blang Pidie
Kuta Cane
PLTU Nagan Raya #1,2 : 200 MW-2013/14 #3,4 : 400 MW-2018/19
P. Susu
G
U ~
Mabar
P. Pasir P.Geli Labuhan KIM Lamhotma Namorambe Glugur Wampu Sei Sei. HEPP P. Batu RotanDenai Titi Kuning A K.Namu Perbaungan T . Morawa
Kisaran P. Siantar
Sidikalang Sabulusalam
Tele
P
Aek Kanopan
Porsea
~ Asahan I
D. Sanggul PLTP P. Bukit
Simangkok PLTP Sarulla& P Sipaholon ~
PLTU ~ L. Angin
U
Sibolga
~
Asahan III A HEPP Asahan ~ IV& V HEPP
A
K. Pinang
P
Siak Sri Indra Pura
Minas
Panyabungan
Maninjau HEPP ~ Pariaman
Pasir Putih
U Tenayan
~
Kulim
~ Kt. Panjang
Payakumbuh
P
P. Kerinci
HEPP
Tembilahan
Pd. Luar Singkarak HEPP ~
Batusangkar Pd. Panjang
Lubuk Alung
PLTP Muara Laboh 220 MW-2017/18 PLTP Bonjol 165 MW-2022
Garuda Sakti Bangkinang
Teluk Lembu
Simpang4
PLTA Batang Toru 510 MW-2022
New G.Sakti Perawang
G
Kandis
P. Pangarayan PLTP S. Merapi
U
Duri
Bagan Batu
Pd . Sidempuan
PLTP Sarulla I&II 440 MW-2017/18 PLTP Sorik Merapi 240 MW-2020/21
PIP
GIS Kota
S.Haru
Pauh
T. Kuantan Ombilin
U
Salak Indarung Solok P PLTP G. Talang Bungus
PLTA Merangin 350 MW-2021 PLTP Sungai Penuh 110 MW-2022
Kiliranjao
PLTU Riau Kemitraan
Muara Bungo
Kambang
Payo Selincah
~
Muara Bulian
G
Sarolangun
S. Penuh
B. Lincir
Bangko
A
Muara Rupit
Merangin HEPP
U
PLTU Jambi (KPS)
U
S. Lilin
U T.Api-api
~ Betung
Tl. Kelapa
Mukomuko
Lubuk Linggau
~
PLTU K. Agung
U
T. Tinggi
~
PLTP Danau Ranau 110 MW-2022 PLTP Suoh Sekincau 220 MW-2021/22 PLTP Ulubelu 220 MW-2012 & 16/17 PLTP Rajabasa 220 MW-2021/22
6 Mariana
~
PLTG G. Megang
Kayu Agung
Lahat Gumawang
Musi HEPP
Mesuji
PLTP
P.Baai
PLTP Lumut Balai 220 MW-2017/18/19 PLTP Rantau Dedap 220 MW-2019/20
5
7
Simpang3 Prabumulih
~
M. ENIM
Pagar Alam
P L. Balai
Manna
PLTG/MG Peaking Lampung 200 MW-2016
Dipasena Baturaja
P
PLTP R. Dedap
G
Borang
1
~
U
PLTU Banjarsari
2
1 . PLTG Apung 2. PLTG Ex Pulo Gadung 3 . IPP Palembang Timur
4
GIS Kota I
Bukit Asam
U
U Pekalongan Argamakmur
~
Keramasan
PLTU S. Belimbing
P
Sukamerindu
3
Sekayu
PLTP Hulu Lais
Tes HEPP
PLTP Hulu Lais 110 MW-2018/19 PLTP Kepahiyang 220 MW-2020
K. Tungkal Aur Duri
S. Rumbai
P
Sumbar Pessel
PLTU Teluk Sirih 224 MW-2013/14
Rengat
~
~ Limo
U
275 kV AC 500 kV AC HVDC
• PLTU Banjarsari 230 MW-2014 • PLTU Keban Agung 227 MW-2014 • PLTU Sumsel-1 MT 600 MW-2020/21 • PLTU Sumsel-6 600 MW-2019/20 • PLTU Sumsel-8,9,10 3000 MW-2018/19
Dumai KID
G.Tua
PLTA B. Toru
PLTU Sumsel 5 & 7 600 MW-2015/16/17
Malaka
Bagan Siapi- api
R. Prapat
HEPP
Tarutung
PLTU Jambi 800 MW-2019/20
TNB Malaysia
G.Para
Renun HEPP ~
PLTU Riau Kemitraan (PLN-TNB-PTBA) 1200 MW-2018
PLTG/MG Peaking Riau & Jambi 300 MW-2016
K. Tanjung
T. Tinggi
Galang
Brastagi Tapak Tuan
PLTA Asahan III 174 MW-2017
PLTU Pangkalan Susu #1,2 : 440 MW-2014/15 #3,4 : 400 MW-2016/17 PLTU Sumut-1:300 MW-2017 PLTU Sumut-2:600 MW-2020/21
PLTG/MG Arun & Sumbagut-1 400 MW-2015/16
Ulee Kareng
D
P. Ratu Menggala
Muara Dua
B. Umpu
PLTP P D. Ranau
Sp.Banyak
Bukit Kemuning
Kotabumi
Metro G Sribawono Adijaya Tegineneng B. Tegi Natar Gd. Tataan HEPP Sutami ~ Pagelaran Langkapura PLTP Suka UluBelu~ New Tlk . rame Tarahan K.Agung Betung
~
Besai HEPP
P
PLTP S. Sekincau
Liwa Bengkunat
P
PLTP Wai Ratai
Tlk. Ratai
~
Tarahan PLTPP Rajabasa
U Kalianda
Sistem Sistem JAWA JAWA
10
Expansion Plan for Kalimantan SABAH (MALAYSIA)
PLTG/MG Pontianak 100 MW-2017
PLTA Kelai 55 MW-2022
PLTU Parit Baru 100 MW-2015 PLTU Kalbar-2 2x200 MW-2020/21
PLTU Kaltim-2 200 MW-2017/18 • PLTU Embalut (Eksp.) 50 MW-2014 SERAWAK • (MALAYSIA) PLTG Kaltim Peaking 100 MW-2013 • PLTG Kaltim Peaker 2 100 MW-2016 • PLTG Kaltim Peaker 3 50 MW-2021
PLTA Nanga Pinoh 98 MW-2022
11
Sambas
U
Singkawang Bengkayang
Putussibau
U
U
Ngabang Mempawah
U G
Parit BaruU
Sanggau
Siantan
Tj. Redep
U
U
A A
Maloi
PLTG/MG Bangkanai 280 MW-2015/16/17
Sangatta
Sintang U
U
Bontang
G G
Tayan
Melak
Nanga Pinoh
Sei Raya
U
Kota Bangun
U
U
A
A
GG
Puruk Cahu
U
U
D
U
Kuala Kurun
Kota Baru Sukadana
G G
D
Sukadana
GU
Manggarsari Petung
UU
Buntok
U
U
PLTU Kaltim-3 300 MW-2020/21 PLTGU Senipah 117 MW-2013/17
U
Karangjoang
Muara Teweh
D
PLTU Tj. Redep 14 MW-2014
G
Sekadau U
PLTU Ketapang PLN : 20 MW-2015 IPP : 14 MW-2015
U
U
Tj. Selor
U
G
Kota Baru
Tidang Pale Malinau
PLTU Pantai Kura-Kura 55 MW-2015 PLTU Parit Baru Loan China 100 MW-2016 PLTU Kalbar-1 200 MW-2018/19
• PLTG/MG Tj. Selor 15 MW-2015 • PLTU Tj. Selor 14 MW-2014
Industri
SULAWESI TENGAH PLTU Muara Jawa 220 MW-2014
Kuaro
D
U Ketapang U
Kasongan
Parenggean Nangabulik
PLTU Kalselteng-1 200 MW-2018/19 PLTU Kalselteng-3 100 MW-2019 PLTU Sampit 50 MW-2016 PLTU Pulang Pisau 120 MW-2015
Pangkalan Banteng
U
New Palangkaraya
D
Sampit
U U Sukamara
Palangkaraya
D
Amuntai
UU
D
SULAWESI PLTU Kalsel-1 SELATAN 65 MW-2019
Tanjung
D
UU
Barikin
Selat
Pangkalan Bun
U
U
Rantau Kayutangi
Kuala Pambuang
Seberang Barito Trisakti Mantuil
G
PLTG Kalsel Peaker 1 200 MW-2016
Ulin
A Cempaka Bandara
Pelaihari
UU
U
A
Batu Licin
A
Kotabaru
PLTA Kusan 65 MW-2022
D Satui
PLTU Asam-Asam 130 MW-2013 PLTU Kalselteng-2 200 MW-2017 11
Transmission Expansion Plan for Sulawesi 2
Likupang
Paniki
Teling Ranomut Bitung D A Tasik Ria Kema Sawangan
10
Tolitoli
GORONTALO
8 24
U
Buroko
U
Moutong
Bintauna
Marisa Botupingge
G
Otam
7
SULAWESI UTARA
U
Molibagu
P
Bunta
Silae
12
Ampana Luwuk
U
Palu Baru
Poso
Toili
G
Pasangkayu
A
SULAWESI BARAT
A
13
Tentena Kolonedale
Topoyo
14
15
A
Mamuju Baru U
SULAWESI TENGAH Malili Wotu
Mamuju
32 16 17 A
18
Palopo
SULAWESI TENGGARA
Makale
A A A
Polman Majene
Bakaru
Lasusua
Enrekang Siwa
SULAWESI SELATAN
Pinrang Pare
D
Sidrap
19 G
U
U
A
U
U
Kendari
27
P
28 U
Barru
Tonasa
Pangkep
26
25
Soppeng
U U
11
A
Unaaha
GU
20
23
Kolaka
Sengkang
Bone
29 U
Maros Bosowa
Tello D
Raha
Kajuara
G
Sinjai
Sungguminasa A
U U
Punagaya Tallasa
21 22 U U
U
Bantaeng Jeneponto
30
Bau-Bau Bulukumba
5
Lolak
U
9
Siboa
6
U
P
Isimu
Talise
Tomohon
U Lopana U
Leok
U
KALIMANTAN TIMUR
U
4
3
31
U
1
GU
P P
Tonsealama
Kawangkoan P
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32.
PLTU Sulut 3 PLTG/MG Minahasa PLTA Sawangan PLTU Sewa Amurang PLTP Lahendong V & VI PLTU Sulut I PLTU TLG PLTU Gorontalo PLTG Gorontalo PLTU Tolitoli PLTGU Makassar peaker PLTU Palu 3 PLTA Poso 2 PLTA Karama PLTU Mamuju PLTA Malea PLTA Bonto Batu PLTA Bakaru II PLTGU Sengkang PLTU Sulsel Barru 2 PLTU Punagaya PLTU Jeneponto 2 PLTA Wotunohu 1 PLTU Sulbagut 1 PLTA Konawe PLTU Kendari 4 PLTP Laenia PLTU Kendari PLTU Raha PLTU Bau-Bau PLTU Wangi PLTA Poko
100 MW-2018 150 MW-2016 12 MW-2019 50 MW-2016 40 MW-2017/18 50 MW-2016/17 20 MW-2013 50 MW-2015 100 MW-2017 45 MW-2017 450 MW-2016/17/18 100 MW-2018 130 MW-2021/22 450 MW-2020/21 50 MW-2016 90 MW-2020 110 MW-2019 126 MW-2020 180 MW-2013 100 MW-2018 200 MW-2016 200 MW-2018 15 MW-2021 100 MW-2019/20 50 MW-2021 100 MW-2024 20 MW-2022 50 MW-2016 6 MW-2016 20 MW & 14 MW-2014 6 MW-2015/16 234 MW-2020/21 12
Thank You
13