METHODOLOGY OF ENERGY ANALYSIS Tasks to be elaborated: 1. Compiling the set of operative regulations of the Hungarian side 2. Defining questions and scope of required data for the joint questionnaire of building selections 3. Surveying public buildings of involved 9 municipalities to select 16 buildings for energy performance analyses 4. Working on joint questionnaire of energy performance analyses 5. Analysing 16 selected buildings' energy performance in details 6. Expert taking part in 16 site visits to make on site measurements and checks about insulation, building engineering, location 7. Preparing 16 project fiches to describe the necessary investments and match them with potential funding sources
SELECTION OF PUBLIC BUILDINGS Data analysis – Village of Magyarszék Annual Anual heating electricity Annual Annual energy costs costs amount of amount of [HUF] [HUF] heating electricity energy [GJ] [kWh] TOTAL TOTAL [HUF] [HUF]
Floorplace (m2)
Airspace (m3)
In case of gas heating: annual amount of gas [m3]
2 350
11 550
24 969
839,957
2 630 458
19 666
497
1 850
4 662
156,830
501 151
124
372
0
112
336
450
15,138
490
2 340
7 697
Ifjúsági szállás
372
1 116
Német Klub
312
936
Institution
Primary Primary Primary energy energy energy consumption - consumption - consumption gas electricity TOTAL (kWh / m2) (kWh / m2) (kWh / m2)
Heating energy consumption [GJ/m2]
Electricity energy consumption [kWh/m2]
757 930
0,36
8,37
99
23
123
9 389
362 656
0,32
18,89
88
53
141
1 600
63 075
0,00
12,90
0
36
36
59 497
1 415
55 960
0,14
12,63
38
35
73
258,927
819 387
8 527
329 501
0,53
17,40
147
49
196
2 610
87,800
285 985
1 995
78 268
0,24
5,36
66
15
81
2 015
67,785
223 598
1 855
72 883
0,22
5,95
60
17
77
Primary,- and Secondary Schools: Magyarszéki Általános Iskola Nursery schools: Magyarszéki Óvoda Social Institutions: Nyugdíjasház Sport, culture: Sportöltöző és kiállító tér Mayor's Office: Faluház és polgármesteri hivatal Others:
SELECTION OF PUBLIC BUILDINGS Data analysis – City of Mohács Institution
Floorplace (m2)
Airspace (m3)
In case of gas heating: annual amount of gas [m3]
Annual amount of heating energy [GJ]
Annual heating energy costs [HUF] TOTAL [HUF]
Annual amount of electricity [kWh]
Anual electricity costs [HUF] TOTAL [HUF]
Heating energy consumption [GJ/m2]
Electricity energy consumption [kWh/m2]
Primary energy consumption gas (kWh / m2)
Primary energy consumption electricity (kWh / m2)
Primary energy consumption TOTAL (kWh / m2)
Nursery schools: Brodarics tér 1.
1 062
2 867
622
3 330 169
3 574
254 258
0,59
3,37
163
9
172
Szőlőhegy, Bári út 1.
280
952
4 135
138
456 284
2 625
93 045
0,49
9,38
137
26
163
Rókus u. 28.
626
1 690
10 900
364
1 344 772
7 200
284 723
0,58
11,50
162
32
194
Eötvös u. 26.
535
1 445
8 710
291
960 108
10 488
384 833
0,54
19,60
151
55
206
889
3 023
10 532
352
1 668 886
23 287
957 924
0,40
26,19
110
73
183
3 573
9 165
64 108
2 142
12 426 438
50 500
2 020 000
0,60
14,13
167
40
206
Kórház u. létesítmény
1 028
3 084
10 445
349
12 312
12 096
7 334
0,34
11,77
94
33
127
Újvárosi létesítmény
324
875
5 918
198
12 312
14 637
1 696
0,61
45,18
170
126
296
Csónakház
320
864
4 022
134
12 312
8 094
1 696
0,42
25,29
117
71
188
Ifjúsági Centrum
2 798
9 513
24 721
826
3 457 500
42 269
728 590
0,30
15,11
82
42
124
Mohácsi Jenő Könyvtár
1 012
2 732
12 142
406
1 004 413
14 591
185 495
0,40
14,42
111
40
152
MTE, Kórház u. 11. Sportpálya
1 028
3 000
13 156
440
2 550 106
13 000
520 000
0,43
12,65
119
35
154
0
0
29 000
1 696
0,00
0,00
0
0
0
1561
4293
73 526
2 457
14 251 986
71 900
2 876 000
1,57
46,06
438
129
567
1 395
4 883
28 277
945
5 030 931
80 294
2 701 218
0,68
57,56
188
161
349
143
Crèches: Bölcsőde, Dózsa Gy. U. 9. Social Institutions: Pándy Kálmán Otthon Sport, culture:
Public health: Egészségügyi Alapellátó Intézmény ESZI, Gólya u. 42. Mayor's Office: Főépület Others: Duna Irodaház
2 339
7 017
24 130
806
3 645 292
39 633
1 344 914
0,34
16,94
96
47
Közhasznú Kiszolgáló Épület, Baross u. 25.
358
967
1 977
66
237 905
2 732
106 539
0,18
7,63
51
21
73
Közétkeztetési Ellátó Szervezet
505
1 364
19 952
667
4 903 300
27 800
972 462
1,32
55,05
367
154
521
SELECTION OF PUBLIC BUILDINGS 16 public buildings: Institution
Művelődési ház (Kadarkút) Faluház és polgármesteri hivatal (Magyarszék) Hársvirág Óvoda Mázai Telephelye (Máza) Pándy Kálmán Otthon (Mohács) MTE, Kórház u. 11. Sportpálya (Mohács) ESZI, Gólya u. 42. (Mohács) Árpád Fejedelem Általános Iskola (Nagyatád) Polgármesteri Hivatal (Nagyatád) Irodaház Baross G. u 1 (Nagyatád) Alapszolgáltatási központ + könyvtár + városgazdálkodás (Nagybajom) Sportcsarnok (Nagybajom) volt Egészségügyi központ (Sellye) Sellyei Közös Önkormányzati Hivatal (Sellye) Faluház (Szászvár) SZTK Új épület (Barcs) Polgármesteri Hivatal (Barcs)
Floorplace (m2)
Airspace (m3)
In case of gas heating: annual amount of gas [m3]
Annual amount of heating energy [GJ]
Annual heating energy costs [HUF] TOTAL [HUF]
Annual amount of electricity [kWh]
Anual electricity costs [HUF] TOTAL [HUF]
Heating energy consumption [GJ/m2]
Electricity energy consumption [kWh/m2]
Primary energy consumption gas (kWh / m2)
Primary Primary energy energy consumption - consumption electricity TOTAL (kWh / m2) (kWh / m2)
926
2 777
10 452
357,000
1 609 080
13 188
254 460
0,39
14,24
107
40
147
490
2 340
7 697
258,927
819 387
8 527
329 501
0,53
17,40
147
49
196
255
714
7 601
254
611 611
8 477
204 104
1,00
33,24
277
93
370
3 573
9 165
64 108
2 142
12 426 438
50 500
2 020 000
0,60
14,13
167
40
206
1 028
3 000
13 156
440
2 550 106
13 000
520 000
0,43
12,65
119
35
154
1561
4293
73 526
2 457
14 251 986
71 900
2 876 000
1,57
46,06
438
129
567
3 300
9 900
1 828
8 924
63 930
2 916
0,55
19,37
154
54
208
1 559
4 677
22 910
802
4 969
45 650
1 987
0,51
29,28
143
82
225
1 257
3 771
22 040
771
4 527
13 500
526
0,61
10,74
171
30
201
5 779
194
902 114
7 104
349 391
0,27
9,87
75
28
103
0
156 589
9 192 298
0,00
63,94
0
179
179
720 2 449,15 778
2 100
22 572
751
3 368 004
440
246 904
0,97
0,57
268
2
270
829
3 067
13 572
464
2 095 104
31 620
1 473 252
0,56
38,14
156
107
262
550
1 480
7 620
255
909 362
0
0,46
0,00
129
0
129
1 013
3 039
155 273
764
7 686 000
47 415
2 063 522
0,75
46,81
210
131
341
2 398
8 153
62 106
4 563
8 590 053
62 908
2 953 598
1,90
26,23
529
73
602
DETAILED ANALYSIS Analysis of data provided by the municipalities – Village Center, Magyarszék Existing U value 2 [W/m K]
Requirement 2 U value [W/m K] (from 01.01.2015)
Adequacy
Facade wall
0.569-1.49
0.24
does not comply
Windows and doors
1.40-5.00
1.15
does not comply
Roofs
0.30-2.76
0.17
does not comply
Floor
2.85
0.30
does not comply
Name of the structure
Conclusions on proposed refurbishments: • Outside wall – thermal insulation • Some of outside windows (above U=2 values) - replacement • Attic slab and the roof slab – thermal insulation (needs further examination) • Ground touching floor – thermal insulation • Thermal technique development and modernization of building engineering systems
DETAILED ANALYSIS Analysis of data provided by the municipalities – Sport building, Mohács Existing U value [W/m2K]
Requirement 2 U value [W/m K] (from 01.01.2015)
Adequacy
1.38
0.24
does not comply
2.60-3.00
1.15
does not comply
Slab under attic
1.11
0.17
does not comply
Arcade slab
2.52
0.17
does not comply
Floor
1.07
0.30
does not comply
Name of the structure
Solid brick facade walls Windows and doors
Conclusions on proposed refurbishments: • Outside wall – thermal insulation • Outside doors and windows - replacement • Closing, attic and arcade slab – thermal insulation • Ground touching floor – thermal insulation • Thermal technique development and modernization of building engineering systems
SITE VISITS Village Center, Magyarszék
SITE VISITS Sport building, Mohács
PROJECT FICHES Structure of project fiches • •
• •
•
•
General information about the building Existing condition − Boundary structures − Heat production system − Heating system Energy analysis Proposed energy efficiency measures, estimated costs − Proposed refurbishments − Energy performance of the building after the proposed refurbishments − Estimated costs of the refurbishment Financial analysis − Estimate savings (GJ/yr, kWh/yr, tCO2/yr, HUF/yr) − Payback time (without and with EU funding) − Net present value calculation (without and with EU funding) Conclusions and recommendations
PROJECT FICHES Main findings • • • • • •
Average size of buildings: 1337 m2, 5115 m3. High heat transfer coefficients at outside walls, windows, doors, roofs, slabs, floors Gas heating with outdated thermal technique and of building engineering systems Complex refurbishment is needed at most of public buildings Present E performance levels: D – G Achievable E performance levels: B – A+
Averages of 16 public buildings: • Total investment cost: 76.4 million HUF (254.7 thousand EUR) • Estimated saving of total energy cost: 4,36 million HUF (14,55 thousand EUR) • Payback time - IRR: 19.8 yrs – 4.3% • Payback time – IRR (with 85% EU funding): 3.0 yrs – 60.9%
Investments are generally proposed to be implemented with EU funding.
Thank you! György MÁRTON managing director Logframe Consulting Office www.logframe.hu