Public Disclosure Authorized Public Disclosure Authorized
E944 Volume 1 MINISTRY OF SETTLEMENT AND REGIONAL INFRASTRUCTURE DIRECTORATE GENERAL OF URBAN AND RURAL DEVELOPMENT JI. Pattimura 20 Kebayoran Baru, Jakarta 12110, Telp. 72796588 Fax. 72796588
CONSOLIDATED
Public Disclosure Authorized
Public Disclosure Authorized
ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR PDAMs BOGOR, KAB. LEBAK, CIREBON, BANJARMASIN, PONTIANAK, MAKASSAR, KENDARI, AND JAMBI (English translation)
March 26, 2004
URBAN WATER AND SANITATION IMPROVEMENT AND EXPANSION PROJECT
EnvironmentalImpact Assessment for PDAM
LIST OF CONTENTS
I.
II.
INTRODUCTION 1.1
BACKGROUND
1.2
OBJECTIVES
PROJECT DESCRIPTION
II.
ENVIRONMENTAL SCREENING 2.1
REGULATIONS
2.2
SCREENING PROCESS
2.3
ACTIVITIES THAT CAUSE IMPACT
2.4
IMPACTS ON ENVIRONMENT
IV.
MITIGATION AND MONITORING OF ENVIRONMENTAL IMPACT
V.
EVALUATION AND RECOMMENDATION
ATTACHMENT 1. LIST OF ATTENDANCE 1.1. Kab.Lebak 1.2. Kota Cirebon 1.3. Kota Pontianak 1.4. Kota Banjarmnasin 1.5. Kota Makassar 1.6. Kota Kendari 1.7. Kota Jambi
Environmental Impact Assessment for PDAM
2
I.
INTRODUCTION
1.1
BACKGROUND
The project is to improve and expand the service delivery of water supply by strengthening the PDAM to become more operationally efficient and financially sustainable. It is a "fast track" operation for those PDAMs that have been ready and are committed to improve and expand service delivery. The schedule is to complete this assignment by end February 2004. 1.2
OBJECTIVE OF PREPARING EMP
The potential impact of project activities is limited and measures for mitigating the environment impact is relatively simple and well known. The EMP is prepared to predict special potential environmental impact. The environmental screening is carried out to find out if ANDAL or UKLIUPL is required. The review will be made in accordance with OP/BP/GP 4.01 on Environemntal assessment, as well as other relevant government regulations on environmental assessment. II.
PROJECT DESCRIPTION (taken from draft PAD)
Water supply component comprises system improvements for the participating PDAMs which are diversely located on the islands of Sumatra (Jambi), Java (Cirebon and Kabupaten Lebak), Kalimantan (Banjarmasin and Pontianak), and Sulawesi (Makassar, Manado and Kendari). The investment plans for each PDAM (in constant price) are included in Tables 2.1 to 2.8. Common physical elements of the investment program under the Bank loan in each city include: *
Distribution system construction: Planned distribution improvement works in each city includes system expansion and optimization, and an unaccounted for water (UFW) reduction program. System expansion includes laying new pipelines to increase the area coverage of the reticulation system to meet the demands in new areas and so increase revenue through increased sales. It also includes new connections for infill in areas that presently have distribution pipelines but only few house connections. A water loss program will be conducted in all cities except Cirebon where the UFW is reportedly already well below 20%. The unusually low UFW for Cirebon will be verified. The exact nature of the UTFW in the cities is unknown at this stage. Therefore, the UFW reduction program will include determining the nature of the UFW - proportion of illegal connections, physical leakage and administrative errors due to inaccurate meters and meter readings, to ascertain the most effective means of loss reduction; installing or replacing bulk water meters and eventually all older service connection meters; procurement of leak detection equipment; and prioritizing the service area by blocks for action.
*
Headworks construction: The headworks improvements generally involve upgrading of intake and or transmission pipelines and rehabilitation of the treatment facilities. Expansion will only be considered after efficiency gains have been made and implemented. New sources are required in Cirebon as the existing spring sources are fully developed, and in
Environmental Impact Assessment for PDAM
3
Lebak where the existing river intake would be eventually abandoned and moved upstream of the city. The rehabilitation of the treatment plants in four of the cities - Banjarmasin, Jambi, Kendari and Manado, will increase the treatment capacity by as much as 50%, thus providing a cost effective means of increasing supply. All of the cities, except for Kendari, will require expansion of the treatment plant capacities. Table 2.1 PDAM Banjarmasin Investment Plan Activity Total Engineering Consultants * Optimization study and corporate plan upgrade * Design and construction supervision * UFW supervision consultant * Project implemetation adviser Headworks * Raw water transmission upgrade * Optimizing Ahmad Yani WTP * WTP capacity upgrade Distribution System * Distribution system expansion * New house connections* * UFW reduction program ANNUAL TOTALS *Funding of new connectoins under the project starts in 2005
Cashflow Projection (Rp million) Year 2 Year 3 Year 4 2005 2006 2007
Year 1 2004
1,000 1,110 350 250
1,000 250 150 60
26,500 5,000 25,000
15,900
41,000 14,850 8,000 123,060
0 0
Year 5 2008
250 100 60
250 50 60
240 50 40
3,750
10,600 5,000 11,250
5,000
5,000
675 1,600 23,385
8,200 2,835 2,400 40,695
20,500 4,253 2,400 32,513
12,300 4.253 1,600 23,483
Year 6 2009
120 30
2,835 2.985
Table 2.2 PDAM Cirebon Investment Plan Activity Total Engineering Consukants * Feasibility study * Detail design and construction supervision * Project implemetation adviser Headworks * Replace older raw water transmision from Paniis* * Captation of intakes at new sources (3 springs) * Construct aeration/disinfection facilities for new source * Construct transmission main from new source Distribution System * Distribution system expansion * New house connections * UFW reduction program ANNUAL TOTALS
3,230 250
Cashflow Projection (Rp million) Year 2 Year 3 Year 4 2005 2006 2007
Year 1 2004
Being undertaken under separate budget 650 970 60 60
5,200 2,500 1,500 35,000 10,200 4,455 0 62335
2,600
0
Year 5 2008
970 60
320 40
20,000
1.500 15.000
Year 6 2009
320 30
2,600 2,500
165
2,550 165
2,550 825
2,550 1,650
2,550 1,650
3,475
8,845
24,405
21,060
4,550
*Excluding Rp2,100 million received from KIMRASWIL.
Environmental Impact Assessment for PDAM
4
Table 2.3 PDAM Jambi Investment Plan Activity Total
Cashflow Projecdon (Rp million) Year 2 Year 3 Year 4 2005 2006 2007
Year 1 2004
EngineeringConsultants * Corporate plan review 600 * Detail design and construction supervision 1,200 * Project implemetation adviser 250 Headworks * Upgrade works at intakes 1,950 * Rehabilitate and upgrade Broni WTP 3,000 * Rehabilitate and upgrade Tanjung Johor WTP 250 * Rehabilitate and upgrade Benteng WTP 10,000 * Construct new Sijinjang WTP for East Jambi 16,000 DistributionSystem * Distribution system expansion 12,000 * New house connections* 12,800 * UFW reduction program 8,300 ANNUAL TOTALS 66,350 * New connections in 2004 are financed from funds other than the project.
600 40 60
0
400 60
400 60
750 1,000 250 2,000 6,000
1,200 2,000 4,000 6,000
4,000 4,000
1,500 2,000 2,300 16,500
1,500 2,400 2,200 19,760
3,000 2,800 1,400 15,660
Year 5 2008
Year 6 2009
240 40
120 30
3,000 2,800 1,400 7,480
3,000 2,800 1,000 6,950
Year 5 2008
Year 6 2009
Table 2.4 PDAM Kendari Investment Plan Activity Total
EngineeringConsultants * Corporate plan upgrade study 600 * Detail design and construction supervision 1,250 * Project implementation adviser 250 Headworks * Upgrade pumps at intake and booster pump stations 2,000 * Rehabilitate existing WTP 5,000 DistributionSystem * Distribution system expansion 5,500 * New house connections* 5,225 * UFW reduction program 2,820 ANNUAL TOTALS 22,645 * In year 2004 assume no new connections, funded under the investment project.
Environmental Impact Assessment for PDAM
Cashflow Projecton (Rp million) Year 2 Year 3 Year 4 2005 2006 2007
Year 1 2004
0 0
600 650 60
240 60
120 60
1,200 500
800 2,500
2,000
700 550 620 4,880
600 550 600 5,350
1,400 1,375 600 5,555
120 40
120 30
1,400 1,375 600 3,535
1,400 1,375 400 3,325
5
Table 2.5 PDAM Kabupaten Lebak Investment Plan Activity Total EngineeringConsultants * Corporate plan upgrade study * Detail design and construction supervision * Detail design and construction supervision Maja system * Project implemetation adviser
Cashflow Projection (Rp million) Year 2 Year 3 Year 4 2005 2006 2007
Year 1 2004
600 1,750 750 250
600 1,150 500 60
120 130 60
240 120 60
7,750
3,750
200
600
420 1350 900 1,650 12,580
3,400 840 675 700 1,650 12,035
Year 5 2008
120
120
40
30
Headworks
* Purchase land for new WTP complex * Expand existing WTP capacity * Relocate existing WTP to new site * Construct new WTP * Reabilitate Kota Maja WTP * Integrate Rangkasbitung and Warunggunung systerms Distribution System * Construct transmission from new WTP * Distribution system expansion * Construct distribution system and connections in Maja * UFW reduction program * New house connections* ANNUAL TOTALS *Project funding of new connections commences in 2005.
1,620 0 3,500 12,500 2,000 800 3,400 4,080 2,700 3,900 6,870 44.720
Year 6 2009
1,620 3,500 1,000 2,000
1,620
300 675 900 270 7,455
1260
1260
700 1,650 7,270
700 1,650 3,760
Table 2.6 PDAM Makassar Investment Plan Activity Total Engineering Consultants * Review corporate plan * Detail design and construction supervision * Project implemetation adviser
Cashflow Projection (Rp million) Year 2 Year 3 Year 4 2005 2006 2007
Year 1 2004
0 9,000 250
4,500 60
3,300 60
Year 5 2008
400 60
400 40
27,000
30,000
15,000
20,000
6,000 5,500 3,500 57,460
6,000 5,500 3,500 65,440
Year 6 2009
400 30
Headworks
* Connect Panaikang WTP to transmission from Bili Bili * Add 50 L/s to Antang WTP * Add 500 LUs to Panaikang WTP Distribution System * Distribution system expansion * New house connections* * UFW reduction program ANNUAL TOTALS *Project starts to fund new connections in 2005
57,000 0 35,000 24,000 27,500 20,000 172,750
Environmental Impact Assessment for PDAM
0
5,500 5,500 15,560
6,000 5,500 4,000 18,860
6,000 5,500 3,500 15,430
6
Table 2.7 PDAM Manado Investment Plan Activity Total Engineering Consultants * Corporate plan review and update * Design review and construction supervision consultant * Project implemetation adviser Headworks * Upgrade raw water transmission to Lotta WTP * Rehabilitate and expand Lotta WTP * Rehabilitate transmission from Pancuran to Winangun * Rehabilitate and expand Paal 11WTP * Upgrade capacity of Malalayang WTP Distribution System * Distribution system expansion * New house connections * UFW reduction program* ANNUAL TOTALS * Funding of new house connections under the project commences in
Cashflow Projection (Rp million) Year 2 Year 3 Year 4 2005 2006 2007
Year 1 2004
600 1,760 250
600 1,040 60
2,550 1,400 750 7,500 600
2,550
11,640 17,500 13,500 58,050 2005.
770 3,500 3,600 16,120
4,000
240 60
240 60
Year 5 2008
Year 6 2009
120 40
120 30
2,350 3,500 2,100 8,110
3,140 3,500 2,100 8,890
1.400 750 3,500 600
0
2,690 3,500 3,600 15,740
2,690 3,500 2,100 9,190
Table 2.8 PDAM Pontianak Investment Plan Activity Total Engineering Consultants * Corporate plan review and update * Design review and construction supervision consultant * Project implemetation adviser Headworks * Construct raw water transmision (800 dia) * New raw water transmision from Biyung to Penepat * Extend raw water transmision Imam Bonjol to Sei Jawi * Expand Selat Panjang WTP * Expand Sei Jawi Luar WTP Distribution System * Distribution system expansion/optimization * Add distribution system reservoirs * New house connections* * UFW reduction program ANNUAL TOTALS *Funding of new connections under the project commences in 2005.
Cashflow Projection (Rp million) Year 2 Year 3 Year 4 2005 2006 2007
Year 1 2004
300 1,200 250
300 300 60
300 60
240 60
64,420 0 7,160 0 5,000
20,000
20,000
24,420
3,160
4,000
8,000 8,400 9,900 8,550 113,180
Year5 2008
180 40
Year 6 2009
180 30
5,000 2,000
0
3,950 1,650 1,600 31,020
1,650 1,800 29,810
2,000 4,450 3,300 1,800 36,270
2,000
2,000
1,650 1,800 10,670
1,650 1,550 5,410
Apart from the above general activities, the city-specific works and measures will include: *
Banjarmasin: Engaging consultants to supervise the UFW reduction program, piloting a zonal system to demonstrate the effectiveness of this approach not only to improve pressures but in facilitating the control of UFW, and the construction of a treated water transmission pipeline to provide bulk treated water to the port and peri-urban communities in the adjacent Banjar and Bariot kabupatens. These areas on the outskirts of the city currently are plagued with declining river and ground water quality, thus the need for new sources of clean water.
Environmental Impact Assessment for PDAM
7
•
Cirebon: Developing new spring sources in the adjoining Kabupaten Kuningan which will involve captation of the springs and construction of treatment facilities comprising aeration and chlorination). Although the PDAM has already purchased the land on which the springs are located, it advised that land will need to be acquired for the reservoirs and break pressure tanks along the route of the transmission pipeline. The city is also expanding its service coverage of the adjoining Kabupaten Cirebon to meet some of the demand with concurrence from the PDAM Kabupaten Cirebon.
*
Jambi: Constructing a new treatment facility to service the rapidly developing eastern part of the city. Land for the facility is owned by the PDAM so there will not be a need for acquisition.
*
Kendari: Optimizing, reconfiguring and replacing the raw water transmission main pumps at the intake and booster pumps stations. The staffing ratio will be improved to further increase the financial efficiency of the PDAM.
*
Lebak: Relocating the existing intake and treatment plant to upstream of the Ciberang River confluence to ensure there will be no influence on water quality from the abandoned gold mine in the catchment of this stream. A treated water transmission main will be extended to the nearby town of Warunggunung, which lacks reliable water sources. The partially constructed treatment facilities at Maja, another town in Kabupaten Lebak, will be rehabilitated to serve Maja town, thus making use of abandoned assets which are costing the PDAM (funded by an existing loan) without generating revenues. The staffing ratio will be improved to further increase the financial efficiency of the PDAM.
*
Makassar: Establishing a trial zonal system to demonstrate the effectiveness of this approach.
*
Manado: Putting in place some catchment protection measures at the existing Malalayang spring sources, repairing pumps in the Pancuran to Winangun reservoir transmission pipeline to increase raw water delivery and system operation to re-establish supply to areas of the city suffering from lack of supply due to low system pressures. The staffing ratio will be improved to further increase the financial efficiency of the PDAM.
*
Pontianak: Establishing a monitoring program at each treatment plant and along the river to the dry-season intake to check seasonal variations in water quality of the source, constructing distribution reservoirs in the service area to improve system pressures and security of supply in western and northern parts of the city and duplicating the transmission main from the dry season intake at Biyung.
The existing condition of the participating PDAMs and key features of the investment plans are summarized in Table 2.9.
Environmental Impact Assessment for PDAM
8
Table 2.9 Summary of Investment Proposals - Water Supply Component Item - Description
Units
Existing Status Urban population
no.
Population served Production capacity Total connections Average water use per connection UFW Staffing ratio per 1,000 connections Bill collection perod Outstanding loans Debt service arrears
% Us no. M3/month % no. days Rp million Rp million
Banjarmasin
Cirebon
Jambi
Kendari
Lebak
Makassar
Manado
Pontianak
216,300
163,999
461,344
540,621
43 218 15,536 22 40 10.2 47 14,482 14,314
30 125 8,926 20 45 10.4 76 32,004 2,230
1,177,02 0 72 2,340 120,233 25 49 6.0 100 118,934 48,822
41 650 33,913 20 59 11.0 75 19,127 19,293
67 910 60,000 23 38 6.0 54 32,004 23,000
No Yes Yes 200
Relocation Yes No 250
No Yes No 500
Yes Yes Yes 275
Yes Yes No 150
25 30 35 36,000 10,000 13,000 Yes Yes Yes W/P Optimize M/P review pumps upgrade Reservoir land No No WTP land No Yes Yes Yes 93,786 98,147 33,300 65,285 65,650 68,703 29,970 45,700 *Costsare expressed in currentprices.
25 65,000 Yes M/P review No Yes 260,278 182,195
25 37,000 Yes M/P review No Yes 85,091 59,564
30 21,000 Yes M/P review No Yes 164,664 115,265
Total (million) (Rp)
591,616
238,102
73 1,051 72,129 23 33 4.5 60 61,838 37,180
92 860 51,720 32 <20 7.1 14 2,667 None
441,40 5 53 753 43,000 22 40 7.7 25 11,482 3,465
Yes Yes Yes 500
New source Yes No 300
Yes Yes Yes 380
(US$)
292,538 148,304
Proposed Project for Financing Headworks * Intake upgrade * Raw water trunk upgrade * Rehabilitation works at ex. WTP * Expand production capacity by Distrbution System * UFW by year 2009 * Additional new connections * System expansion/optimization Additional studies/preparation requirements Social impact Loan scheduling requirement Investment cost* PDAM Loan
Yes/No Yes/No Yes/No Us % Yes/No Yes/No Action Yes/No Yes/No Rp million Rp million
25 34,500 Yes Master plan (M/P) review No Yes 180,258 126,181
EnvironmentalImpact Assessment for PDAM
<20 8,400 Yes
980,809 693,228
115.39 81.56
III.
ENVIRONMENTAL SCREENING
3.1
REGULATORY FRAMEWORK
The regulatory framework used for EMP preparation is the regulation on environmental matters issued by the Government of Indonesia, combined with the requirements as defined by the World Bank for UWSIEP: These regulations on environment of the GOI, among others are: 1. Law No 23/1997 concerning Environmental Management 2. Government Regulation No. 27/1999 regarding Environmental Impact Assessment (AMDAL) 3. Decree of Ministry of Environment No. 17/2001 regarding plan of activites that will require environmental impact assessment. 4. Decree of Ministry of Public Works No. 17/KPTS/M/2003 regarding projects that will require management and monitoring plans on environmenl (UKL/UPL) 5. Decree of Head of Agency for Environmental Impact Control (BAPEDAL) No. 105/1997 regarding Guidelines on Monitoring for Implementation of Environment Management and Environment Monitoring Plans (RKL and RPL) The requirements of the World Bank for UWSIEP are: 1. ENVIRONMENTAL ASSESSMENT (OP/BP/GP 4.01) 2. ENVIRONMENTAL SCREENING (Annex E OD 4.01) 3.2 SCREENING PROCESS The process includes review of of potential environmental impacts generated by project activities of the PDAM and raise important environmental issues, mitigation and environmental action plan to find out if environmental impact analysis (ANDAL) is required to comply with the Decree of the Ministry of Environment No 17/2001. Further, to ensure that there is no subproject in FY 2004 that falls under Category A of the World Bank. Based on Decree No 17/2001, for regional infrastructure, it is listed as No. 1 and for preliminary screening for ANDAL for water supply, listed as No 12 and 13 and for sanitation No 10. For further review, the screening complies to Decree of Ministry of Public Works No 17/2003, which defines activities that needs UKL/UPL as shown on Table 3.1 and Figure 3.1
EnvironmentalImpact Assessment for PDAM
10
Tabel 3.1. Government Environmental Screening Criteria ( by Decree of the Minister of State for the Environment of the Republic of indonesia ) Sectors and Projects 1
2
Water Supply Raw Water Intake
Units
ANDAL(*)
L/s
More than 250
Transmission (Large towns)
Km
More than 10
Distribution
Ha
More than 500
Water Treatment Plant
L/s
Wastewater & Sanitation Sludge treatment (IPLT) Ha
UKL/UPL(+) 50-250 2-10 500-100 > 50
More than 2
Less than 2
Consideration (+) Ensuring downstream availability Impacts on social, aesthetic, traffic disturbance Impacts on social, aesthetic, traffic disturbance Negative impact of sludge from sedimentation tank Impacts on social, aesthetic As above As above
Sewerage System Ha More than 500 Less than 500 IPAL (Wastewater Ha More than 3 Less than 3 treatment plant) Source: (*)Decree of Min. of Environment No. 17/2001 for ANDAL ( Concerning types of Businesses Activities Required to Complete on Environmental Impact Assesment) and (+)Decree of Min. of Public Works No. 17/2003 for UKLIUPL ( Concerning Decision on Types of Activities in the Field of Public Works that are required to Prepare UPL/UKL ) As reference, the World Bank has defined the project as Category B, where only UKLIUPL are to be prepared. To find out important impacts of the projects to the environment, screening of imortant environmental issues, mitigation and action plan on limited and well known scope. This is done through field survey on the proposed project activities that have important impact during construction and operation. For reference, the the World Bank defines the environmental-related category as follows: Category A The proposed project has significant important impacts. The impacts involve much larger areas beyond its physical works. Environmental assessment (EA) for this category A tests potential positive and negative impacts, compares it with other possible options (including option for not doing anything) and recommends measures need to avoid, mitigate, minimize or compensate negative impacts and rectify environment performance. Projects under Category A (a) Dam and reservoir (b) Production Forestry Project
Environmental Impact Assessment for PDAM
11
(c) Industrial plants (large scale) and industrial area, including major expansion, rehabilitation or modification. (d) Irrigation, drainage and flood control (large scale) (e) Aquaculture and sea culture (large scale) (f) Land clearance and leveling (g) Mineral development (including oil and natural gas) (h) Port & harbour (i) Reclamation and new area development (j) Resettlement (k) River river basin development (1) Development or expansion of hidropower and thermalpower (m)Factory, transportation and use of pesticide or hazardous materials (n) New or improvement of highway or rural road (o) Management of hazardous waste and its selling Category B Project proposal is classified as Category B if potential impacts is not good for human population or environmentally importane area is less good as compared to Category A. The impacts are specific for certain areas, small and irreversible and in many cases the mitigation can be designed more ready as compared to project under Category A. there will be environmental assessment required, but in many cases preparation of EMP without detailed assessment, or application of standard procedures of environmental protection will be fulfilled. Project under Category B (a) Agro industry (small scale) (b) Electricity transmission (c) Irigation and drainage (small scale) (d) Renewable energy (except hydroelectric dam) (e) Rural electricity (f) Tourism (g) Rural water supply and sanitation (h) Catchment area project (management or rehabilitation) (i) Protected area and biodiversity conservation (j) Rehabilitation or modifikation of industrial facility (small scale) (k) Energy efficiency and energy conservation Figure 3.1 Overall Screening Process
EnvironmentalImpact Assessment for PDAM
12
I
No I
a) b)
2 a)
b)
Type of Activity Water supply for large cities /Metropolitan Development of network, with service area Transmission line, with length
Size
'
> 500 Ha
Requires ANDAL (Environmental Impact Statement), RKL (Environmental Mangement Plan), RPL (Environmental Monitoring Plan) (Normally these project will be in CategoryA)
> 10 KM
Water abstraction from lake, river, spring or other sources, with abstraction capacity
> 250 L/det
Wastewater and sanitation Construction of sludge TP (IPLT) and/or wastewater treatment plant (IPAL) , with pond area
Size IP'fL > 2 Ha
Sewer piping system, with service area
h
Project will pass trough one or more of the following 1. Commercial/Resident Area 2. Productive Land 3. Monumental, Traditional Religious Building 4. Nature Pressure (Existing/Proposal) 5. Wild Life Reserve 7. Protected Area 8. Fauna Evacuation Area/ Wild life refugee 9. Wetland Area 10. Watershed Protection Area 11. Coastline/River Border 12. Lake/Basin Area 13. Water Resources Area 14. Marine Reserve Area Other waters 15. Mangrove Area 16. National Park 17. Forest Park 18. Nature Tourist Park 19. National Culture Reserve 20. Natural Hazard 21. Steep Slope > 40 %
IPAL> 3 Ha
> 500 Ha
YES
Potentially Significant Impact NO E
..
m................
Environmental Impact Assessment for PDAM
...
.............
.....
.........
........
..............
I
UKL (Environmental Management Plan), UPL (Environmental Monitoring Plan)
Sectors and Projects
1
Units
UKLIUPL
Considerations
Water Supply
Raw Water Intake
LIs
50-250
Transmission
Km
2-10
Ha L/s
500-100 > 50
Ensuring downstream availabilityof water
(Large towns)
Distribustion Water Treatment Plant
Impacts on social, aesthetic, traffic disturbance
As above Negative impact of sludge from sedimentationprocess
2
Wastewater & sanitation
IPLT Sewerage System
IPAL
Environmental Impact Assessment for PDAM
Ha Ha Ha
Less than 2 Less than 500 Less than 3
Impacts o social, aestethetic As above As above
3.3. ACTIVITIES THAT GENERATE IMPACT/SOURCE OF IMPACT In water supply projects, "important activities that will generate impacts" are: 1. Source and raw water transmission a) Intake works: mobilization of equipment and materials, foundation and piles for unsatble soils b) Raw water transmission pipe: Mobilzation of equipment, pipe trench and excavated materials 2. Water Treatment Plant: mobilization of equipment and materials. Foundation and piles works for unstable soil. 3. Distribution system and house connection, and reservoir: mobilization of equipment and materials, foundation and piling of excavated materials Activities under UWSIEP that could create impact/source of impact is presented in Table 3.2 Table 3.2: Activities that generate impact/source of impact I 2 3 4 5
Activity Mobilization of equipment and materials Excavation for foundation Piles construction Excavation for pipe trench Excavated materials
Impacts generated Damage to road, nuissance, traffic disturbance Landslide, erosion, discovery of antiques Nuissance, air pollution Traffic disturbance, discovery of antiques Traffic disturbance, pollution, dust, erosion, landsliding
3.4. IMPACTS TO THE ENVIRONMENT Potential impact during construction and operation can be identified as follows: *
*
*
*
Dust Dust is a small particle with very fine size that will cause problem on throat. Dust originates from the results of gas emision from motorized vehicles (S02 ,NOx,CO ,C02 and HC), project vehicles, dried soil from excavation, or from materials transported by uncovered trucks. Noise Noise originates from the use of heavy equipment or from transporting trucks, and installation of pile foundation in the intake and WTP. Noise will generate noise pollution, uncomfort to the people living in houses located around the project site. Traffic Mobilization of project vehicles passing through roads will create traffic disturbance and traffic accident. Traffic jam will occur on the trench made along the road that reduces the effective width of the road. Traffic jam will also result in complaints from the community and increase the use of gasoline. Road damages
Environmental Impact Assessment for PDAM
*
*
*
*
*
*
The use of heavy vehicles on the road will damage physical condition of the road. The heavy vehicles could worsen the already damaged road. Social impact Installation of transmission/distribution along housing area/settlement, traditional market will create disturbance that may affect/reduce the economic activity. Erosion of excavated materials Erosion is resulted from the excavation materials that are washed away by rain, or if the excavated materials are splashing over road surface, houses and polluting rivers. Erosion distrurbs traffic, transaction in traditional market, household activities and aesthetics. Landslides and Settlements Condition of unconsolidated/unstable soil. Unstable soil makes it easily slide. This condition is dangerous for workers excavating the trench for pipe laying. Aesthetics Placing excavated materials or construction materails on the road could cause disturbance and aesthetic. Discovery of historical remnants Discovery of historical remnants could occur during excavation. It could be an artifact, ancient building, and other historical remnants. Contamination to soil and groundwater. Slduge resulted from sedimentation of WTP is categorized as hazardous waste and has negative impact to human and environment. The transportation and treatment of sludge could pollute soil and water if not properly managed. Pollution occurs if the sludge spreads over during transportation of infitration of dangerious contaminant during the treatment.
Table 3.3 Sources of potential impact on water supply development No.
Type of Impact
Project stages
Operation
1. 2. 3. 4. 5. 6. 7. 8.
Dust Noise Traffic Road facility Social impact Erosion Landslide Aesthetic Discovery of historical remnants
Yes Yes Yes Yes Yes Yes Yes yes yes
no no no no yes no yes no no
Contamination to soil and water
no
yes
9
10.
Environmental Impact Assessment for PDAM
18
IV.
MITIGATION AND MONITORING OF ENVIRONMENTAL IMPACT The process of preparing the EMP matrix for EMP includes:
o o o
o o
o
Proper understanding of the water supply development proposed under UWSIEP, especialy on important subproject activities that may generate/produce impcat to the environment. Field checking on the proposed plan under UWSIEP and to obtain physical condition on the proposed sites that may gnenerat/produce potential impact to the environment. Interview with R&D staff of PDAM, understanding existing condition of PDAM especially project components and their locations, interview with WTP operator, and the people that will be affected by the project activities. Overall screening process for project activities that may have potential impacts to the environment. The information obtained from the field is processed for brief presentation, that covers potential environmental issues, mitigation and action plan (UKL/UPL). The results are discussed with PDAM or LG, Kimpraswil and the World Bank, tabulated for each important activity that has impact to the environment. The table is in the form of matrix of EMP, consisting of source of impact, mitigation and monitoring (UKL/UPL). Consultation with stakeholders include the community related with the EMP (related agencies, local universities, NGOs, LG and Perpamsi, etc)
In the screening process, an EMP matrix was prepared on "construction and operation stages" (column) and "key activities" that could cause impact to environment. For UPL and UKL for the Bank financed project, see Table 4.1 List of EMP matrix for EMP Monitoring Monitoring is carried out under agencies in-charge on the impact to the environment, such as city environmental office and other related offices (settlement and regional infrastructure, police and health). Monitoring of air quality, (noise, dust, air pollution, emision) and monitoring of sludge from sedimentation process are carried out by officers from city environmental office, whereas monitoring of raw water and treated water quality distributed to consumers is carried out by city health office. Monitoring of landslides, erison and working safety is carried out by the office of settlement and regional infrastructure. Traffic management is done by the police.
Environmental Impact Assessment for PDAM
19
Table 4.1 List of EMP matrix for UWSIEP No I
2
3
4
5
EMP for PDAMs PDAM KOTA BOGOR
ACTIVITIES POTENTIALLY GENERATE IMPACTS
TABLE
Duplication of transmision raw water pipe from Ciherang intake to WTP Dekeng
4.1.1
Extend and rehabilitate Dekeng WTP Ekspansion of distribution system
4.1.2 4.1.3
Construction of new intake and raw water transmission, Bojongleles Construction of WTP, Bojongleles Treated water transmission pipe from Bojongleles to distribution system Ekspansion of distribution system distribusi and integration of existing system in Rangkasbitung dan Warunggunung
4.2.1 4.2.2 4.2.3 4.2.4
Replace older raw water transmision from Paniis Spring capturing in three new spring sources Raw water transmission pipe from new springs (Cibulakan, Cigorowong and Cikepel)
4.3.1 4.3.2 4.3.3
Consruction of treament (aeration and desinfection) Expansion of distribution system
4.3.4 4.3.5
Installation of transmission pipe from intake, Penepat, to WTP, Iman Bonjol, eP 800 mm including three booster pump and modificatio of intake, Penepat Treated water transmission main from Imam Bojol WTP (Reservoir and Booster Pump Rambutan ) D 600 mm Upgrading of WTP Transmission main from Imam Bonjol WTP to Selat Panjang WTP and expansion of distribution system Construction new reservoirs 2 x 1000 m3 in North Potianak (JI. Budiutomo Gg.Darmaputra) and West Pontianak (JI. Yos Sudarso Kelurahan Sei Baliung)
4.4.1
Raw water transmision main from Tabuk to Pematang Panjang, increase the capacity from 900 Us to 1,275 Us. (Construction of raw water intake and installation of pumps in Tabuk)
4.5.1
PDAM KAB.LEBAK
PDAM KOTA CIREBON
PDAM KOTA PONTIANAK
4.4.2 4.4.3 4.4.4 4.4.5
PDAM KOTA BANJARMASIN
Upgrading of WTP, Pramuka 2 x 250 Us (new WTP I x 250 Us and upgrading of existing WTP from 500 LUs to 750 ULps
6
Expansion of distribution system (including conversion to establish zonal system)
4.5.3
Pembangunan Pipa Transmissi dari Somba Opu ke Panaikang
4.6.1
Pembangunan IPA Baru (2 x250 Lps) di Panaikang
4.6.2
Pengembangan system distribusi
4.6.3
PDAM KOTA MAKASSAR
EnvironmentalImpact Assessment for PDAM
7
PDAM KOTA KENDARI Upgrade pumps at Intake and booster pump stations Rehabilitate existing WTP
8
4.7.1 4.7.2
Pengembangan system distribusi
4.7.3
New Intake sinjinjang New WTP Tanjungsari
4.8.1 4.8.2
Pengembangan system distribusi Rehabilite works at Intake Pulau Pandan Rebabilite WTP Benteng and upgrade pumps Rehabilite WTP Broni
4.8.3 4.8.4 4.8.5 4.8.6
PDAM KOTA JAMBI
Note: The tables on EMP are prepared in accordance with the following GOI regulations GOI Regulation No 41/1999 concerning Standards for Air Quality and National Ambient for Noise GOI Regulation No. 85/1999 regarding National Hazardous Waste Decree of Ministry of Environment No. Kep-45/MENLHI1O/1997 on Standard Air Pollution Index Decree of Ministry of Environment No. Kep-48/MENLH/1 1/1996 on Standard Quality for Noise Level Decree of Ministry of Environment No. Kep-50/MENLH/1 1/1996 on Standard Quality for Smell Level Decree of Ministry of Environment No. Kep-51/MENLH/10/1995 on Standard Quality for Liquid Waste. Decree of Ministry of Health No 907/2002 on Quality for Raw Water and Drinking Water
EnvironmentalImpact Assessmentfor PDAM
21
Table 4.1.1. EMP Matrix for duplication of raw water transmission pipe from Ciherang intake to Dekeng WTP, PDAM Bogor
No
Phase _
I
Activity potentially generates impPhasegeracts
Component Environent affroetedb afthe Impact
~~~~~~~________________
Environmental Impact Type of
Nature of
Impact
Impact
Benchmark
Environmental Management Plan Remedial action
Institution
Environmental Monitoring Plan Location
Time and Method
Institution
CONSTRUCTION Infrastruct ure/ road
Road damaged
Permanent
Volume of damaged road
Regulation on use of heavy equipment by considering road
-PDAM Kota Bogor -Contractor
Along the transportatio n route
condition
Reguatio on heavv equiipment_
Traffic equipment
Traffic jam
Temporary
distrbanee
Temporary
National standard for air quality
A. PREPARATION A.i PREPRATAir/noise pollution
Pengglian tanal
Transportation
supervising the works according
City Public Works Dept
P
to regulation
-PDAM Kota
transportation to
Bogor
Use of equipment to reduce noise/gas emision in accordance with national standards
-PDAM Kota Bogor -Contractor
~~~~~~~~~~~~~~~~~avoid peak hour
Tmn Location with
above
-PDAM Kota Labour/wor ker
During the activity by
o
Timigfor with caution
Asabove
Tmn
o -e
Polce
City Environm ental Dept. ct
Llandslide
Tamporary
Accident
Protection wall
Bogor -Contractor
Location of excavation
Timvig frthPue actirvitysith supervision
Cit Works Dept
Traffic disturbance
Temporary
Degre of distturbance
Regulation by avoiding excavation during
-PDAM Kota Bogor -Contractor
As above
As above
Police
Ic
Environmental Impact Assessment for PDAM
I
ce
Ipeak hour
i
Transportat ion
Installationof-Labour B. WORKS
-Trafsportat Trac disturbanc e
-Landslide
Temporary
Temporary
r of ademt traffic jm
Regulate ftrench/material filling, not reduce road width
Accident at work
Construct retaining wall
-PDAM Kota Bogor
Along transmission piewith pipa
-PDAM Kota Bogor
Along the trench for transmission
During activity safeguarding
During activity with supervision
pipe
treated water transmission pipe
Air -Air
-Water
-Air pollution
Temporary
Erosion
Temporary
EnvironmentalImpact Assessment for PDAM
standard
Work method, s such as watering
Aesthetic, traffic disturbance
Fill in excavation and provide drains
-PDAM Kota Bogor
Along transmission pipe and people surrounding
-PDAM Kota Bogor
Along transmission pipe
POLICE
city Public Works
Dept. During activity w s with safeguardmg
During activity with supervision
City Envirorn ental Dept.
city Public Works Dept.
23
4.1.2. Matrik EMP Extend and rehabilitate Dekeng WTP -UWSIEP PDAM Kota. Bogor KEGIATAN BERPOTENSI
MENIMBULKAN 4O
TAHAP
DAMPAK /SUMBER DAMPAK (Activity Cause
KOMPONEN
DAMPAK YANG AKAN TERJADI
UPAYA PENGELOLAAN LINGKUNGAN
LINGKUNGAN
(Environmental Impact)
UPAYA PEMANTAUAN LINGKUNGAN
(Environmental Management Plan)
(Environmental Monitoring Plan)
YANG TERKENA DAMPAK
JENIS DAMPAK
SIFAT SIFAK
TOLAK UKUR
UPAYA
LEMBAGA
LOKASI
Environ. Impact
WAKTU DAN CARA
LEMBAGA
KONSTRUKSI
-Prasarana /Jalan
Mobilisasi alat
-Lalu Lintas
dan material
Tetap
laludintas pada Sementara rute perjalanan
Udara/Bising
A. PERSIAPAN
-Kerusakan jalan yang dilalui
-Udara
Pencemaran udara/bising
-Pencemaran udara
Sementara
Sementara
-PDAM Kota Bogor BogoRoute
-Tingkat
Pengaturan berat material material memperhatikan kondisi jalan -pengaturan
-PDAM Kota
Lokasi jalan
/gangguan lalu lintas'
menghundari
Bogor
yang
deuan -Waktu
- jam padat
padat
pengamanan
Pada lokasi tertentu yang padat lalulintas
Wan pengamanan
BAPEDALKO
LkaiPA Lkasi PA' dan sekitar proyek
-atuegan wakt kegatan dengan pengamanan
BAPEDALKO
Lokasi IPA dan masyarakat sekitar proyek
Waktu pemakaian alat berat dengan cara mengukur kebisingan
-Volume kerusakan jalan
Penkemaran BUdara Nasional
Baku mutu u ara
Sepanjang angkutan
Selama kegiatan dengan cara selalu mengawasi kegiatan sesuai
KIMPRASKO
ketentuan
Mengunakan peralatan -PDAM Kota mengeluarkan Bogor bising/gas buang dan sesuai baku mutu Nasional -Mekanisme -PDAM Kota -Bakumutu tekns Boor tehnis Bogor antara lain
DITLANTAS
penyiraman air
.Kebisinga S-Baku Pusisuaa
mutu udara
Penggalian pondasi
-Penyesuaian dengan kegiatan masyarakat dan pemilhan alat memenuhi baku mutu suara
-PDAM Kota Bogor
-PDAM Kota -Pekerja
-Longsor
Sementara
- Air
Erosi
Sementara
Environmental Impact Assessmentfor PDAM
BAPEDALKO
Wkukgaa
Kecelakaan pekeija
Membangun dinding penahan
Bogor
Lokasi pondasi IPA
Waktukegiatan dengan pengawasan
Estetika ,gangguan laluhintas
-Menutup tanah gahan dan membuat pant air
-PDAM Kota Bogor
Lokasi Gahian pondasi IPA
Waktu kegiatan dengan pengawasan
KIMPRASKO
KIMPRASKO
24
-Transportasi
B. PEKERJAAN
PANSCAUKSI KONSTRUKSI (OPERASI)
Pekerjaan jalan masuk, struktur (pagar ,saluran
Lumpur Lumpur sedimentasi
Kebisingan
-Ganngguan lalulnta
Polusi suara
Sementara Seetra
Sementara
-Tingkat kemacetan kmcea lalulintas
-Mengatur galian /timbunan bahan idak mengurangi jalan ruas yang ada -penyesuaian
-PDAM KotaatBogor
Lokasi masuk Proyek IPA
egaa Waktu dna pengamanan
-PDAM Kota
Lokasi IPA
Waktu pemakaian
Bogor Bgrdnaabetdnan
dasyarkatbera
Bising
dengan kegiatan masyarakat dan pe han alat yg sesuai
Estetika
-Menutup tanah
-PDAM Kota
Baku mutu
masyarakat sekitar
- Air
Erosi
Sementara
,gangguan laluIintas
galian dan membuat parit air
Bogor
Tanah dan air Tanah dan air
-pencemaran tanah dan air
Sementara
Baku mutu
Pengelolaan dan Pengolahan
tanah
tah
B3 Nasional
Lumpur Sementasi
Environmental Impact Assessment for PDAM
dengan
DITLANTAS ILNA
BAPEDALKO
cara mengukur kebisingan Waktu kegiatan
Lokasi IPA
dengan pengawasan
KIMPRASKO
-PDAM Kota Bogor
ProyekIPA
Sampling satu
BAPEDALKO
- bagian
P
bulan sekali
DED
tugas
25
Tabel 4.1.3. Matrik EMP KEGIATAN BERPOTENSI MENIMBULKAN 10
DAMPAK /SUMBER
TAHAP
-
UWSIEP PDAM Kota Bogor
KOMPONEN
DAMPAK YANG AKAN TERJADI
LINGKUNGAN
UPAYA PENGELOLAAN LINGKUNGAN
(Environmental Impact)
UPAYA PEMANTAUAN LINGKUNGAN
(Environmental Management Plan)
(Environmental Monitoring Plan)
YANG
DAMPAK
TERKENA
(Activity Cause
DAMPAK
Environ. Impact I
Ekspansi sistem distribusi
JENIS
SIFAT
DAMPAK
DAMPAK
TOLAK UKUR
UPAYA
LEMBAGA
LOKASI
WAKTU DAN
LEMBAGA
CARA
KONSTRUKSI
-Prasarana /Jalan
Mobilisasi alat
-Lalu Lintas dan material
-Kerusakan jalan yang dilalwti
Tetap
-Kemacetan lalulintas pada Sementara
-Volume kermasakan jalan
PegtrnbrtSelama Pengaturan berat memperhatikan kondisi jalan
-Tingkat kemacetan
-pengaturan angkutan jamg
Bogor.
Sepanjang Route angkutan
kegiatan dengan cara selalu mengawasi kegiatan sesuai
PDAM Kota
Lokasi jalan
-Waktu angkutan
padat
pnaaa
Pada lokasi tetnu ya yag lalulintas
Waktu kegiatan dengan pengamna pnaaa
Lokasi jalur pipa dan masyarakat sekitar proyek
-waktu kegiatan
Lokasi jalur pipa dan masyarakat
Waktu pemakaian alat berat dengan cara mengukur
sekitar proyek
kebisingan
Lokasi penggalian jalur pipa
Waktu kegiatan dengan pengawasan
- PDAM
Kota
~~~~~~~lalu lintas' - jam padat
rute peijalana
KIMPRASKO
Mengunakan Udara/Bising
A. PERSIAPAN
Pencemaran udara/bising
Sementara
Bakt mutu Udara Nasional
-Udara -Pencemaran udara
Penggahian galian
-ebiingnaba Pengalan -Kebisingan
-olui uar -Polusi suara
Sementara
Seentra Sementara
-Baku mutu udara
-Baku udara mutu
peralatan mengeluarkan bising/gas buang dan sesuai baku mutu Nasional
- PDAM Kota
-Mekanisme teknis pengerjaan antara lain penyiraman air
PDAM Kota
-Penyesuaian dengan kegia tan masyarakat dan pemilihan alat
Bogor. Bogor.tret
ogor.
-PDAM
Kota
Bogor. Bogor.
memenuhi baku mutu suara
-Pekerja
-Longsor
EnvironmentalImpact Assessmentfor PDAM
Sementara
Kecelakaan pekerja
Membangun dinding penahun
PDAM Kota Bogor.
BAPEDALKO
BAPEDALKO dengan pengamanan
BAPEDALKO
KIMPRASKO
26
-Mekanisme -Udara
-Udara-Pencemaran -Pencemaran udara
-Transportasi
-Ganngguan lallintas
Sementara Sementara
-Baku mutu udara
teknis pengerjaan antara lain penyiraman air -Mengatur galian
Sementara
-Tingkat kemacetan lalulintas
/timbunan bahan ,tidak mengurangi jalan ruas yang
_____________
B. PEKERJAAN
Pekerijaan pemasangan pipa
Kebisingan
-Air
Melewati pasar tradisionil)
PASCA KONSTRUKSI (OPERASI)
Kontrol Baku m talBakt MtAiMnuKnuenAir
Konsumen
Polusi suara
Sementara
Erosi
Estetika Seetr gangguan -AirErosiSementara ina
-Pedagang kclmenitrun pasar kecil
-kesehatan
Environmental Impact Assessment for PDAM
Sementara
Baku Bising
-Pendapat an peda gang
Kemmenaka Ai Mmemno mutu Mimurn
Sepanjang -PDAM
Kota
jalur pipa transmsi dan masyarakat sekitar
-waktu dengan kegiatan pengamanan
- PDAM
Kota
Lokasi masuk Proyek Reservoir
Waktu kegiatan dengan pengamanan
DITLANTAS
BAPDALKO
Bogor.
Bogor.
BA D LK BAPEDALKO
~~~~~
_
-penyesuaian dengan kegiatan masyarakat dan permilhan alat yg psesuai
Lokasi IPA dan masyaraat msaaa sekitar
Waktu emakaian aPa bat pengan cara mengukur aamnuu kebisingan
Jalur pi pa trans pssi
Waktu kegiatan Wkukgaa dengan
IPAK KIMPRASKO
Lokasi jalur pipa psrpoelewat
Sebelum dan saat pelaksanaan
PEMDAKO
K nan Konsumen
Sampling satu bulan sekali
~~~~ada
-Menutup tanah gafian danparit air membuat
- PDAM
Bogor.
Kota
a
_
_
_
PDAM Kota Bogor.
-Sosialisasi dan - PDAM Kota pengaturanpada Bogor. pekerjaan ~~~~~~~~~~jam-jam lenggang
dan dngan
_
PDAM Kota Bogor.
_
27
Tabel 4.2.1. Matrik EMP Pembangunan Intake baru dan Transmisi air baku IPA Bojongleles(baru) di desa Bojongleles -UWSIEP PDAM Kab.Lebak NO
TAHAP (Stage)
I
KEGIATAN BERPOTENSI MENIMBULKAN DAMPAK/SUMBER DAMPAK (Activity Cause Environ. Impact)
KOMPONEN LINGKUNGA N YANG TERKENA DAMPAK
DAMPAK YANG AKAN TERJADI (Environmental Impact) JENIS DAMPAK
SIFAT DAMPAK
TOLAK UKUR
UPAYA PENGELOLAAN LINGKUNGAN (Environmental Management Plan) UPAYA LEMBAGA
UPAYA PEMANTAUAN LINGKUNGAN (Environmental Monitoring Plan) LOKASI WAKTU DAN LEMBAGA CARA
KONSTRUKSI Pengaturan Prasarana/
Kerusakan
Pralaana
jalan yang
Jalan
dilewati
Tetap
Volume
kertusakan jalan
berat material
dengan
Selama -PDAM
Lebak
kab.
Sepanjang
Rpuengnkua
memperhatika
pengangkuta
n kondisi jalan
kegiatan
dengan selalu
KINMRASKAB
mengawasi kegiatan
Mengunakan
peralatanPaalks A. PERSIAPAN
-Mobilisasi
material
alat
~
dan
material
UdaralBsng
Pencemaran
uar/ising udara/bising
Sementara
B
Udara
t
|eP
eIakan
bising/gas
~~~~~~~~~~~Nasional buang dan
Wkt PDAM
Lebak
k
sesuai baku
tertentu
yng padat y
kegiatan
dengan
lalulintas
pengamanan
Lokasi jalan
-Waktu
BPDLA
mutu Nasional -Kemacetan -Lalu Lintas
-Udara
lalulintas dalrulntas
Sementara
-Tingkat
-pengaturan
kemacetan
angkutan
/gangguan
menghindari
peijalanan
lalu lintas'
jam
-Udara -Pencemaran -Pencemaran udara
3Baku mutu Udara Nasional
Mekanisme teknis Pengerijaan al: bila perlu
Sementara
padat
PDAM Lebak
kab.
jam
PDAM Lebak
kab.
penyiraman air B. PEERJAA Pengalian lubang tanah Intake PEEJAN dan penimbunan Intake tanah galian
PASCA KONSTRUKSI (OPERASI)
Kontrol baku mutu Air baku
dengan
padat
pengamanan
Sepanjang jalur pipa transmisi dan masyarakat
Waktu ke'atan
sekitar
pengamanan
Ganga
Menempatkan
PDAM
-Erosi
Sementara
lalulintas ,estetika
tanah gaaian jauh dan ahran air permukaan
Lebak
Membangun
PDAM
-Pekerja
-Longsor
Sementara
Kecela pekeija
dinding penahan
Lebak
Kepmen Kes Baku Mutu Air Minum
Respon Pengolahan Air dan bahan kinula
- PDAM Kab Lebak
Intake Panepat
-Konsumen
-Kesehatan Konsumen
Environmental Impact Assessment for PDAM
Sementara
kab.
kab.
Wankutan
diperkirakan
- Air
Kecelakaan
11
Loasijaa
degan dengan
Sepanj'ang
Waktu
janjpipa transmissi
kegiatan dengan pengawasan
Sepanjang
Waktu
jalur pipa transmissi
kegiatan dengan pengawasan
Penngambila n Sampel lx bulan
DITLANTAS
KIMPRASKAB
KIMRASKAB
KIMPRASKAB
DISKESKAB
4.2.2. Matrik EMP Pembangunan Instalasi Penjemihan Air Bonjongleles -UWSIEP PDAM Kab. Lebak KEGIATAN BERPOTENSI
MENIMBULKAN 0
TAHAP
DAMPAK /SUMBER DAMPAK ( Activity Cause Environ. Impact
___________
KOMPONEN
DAMPAK YANG AKAN TERJADI
UPAYA PENGELOLAAN LINGKUNGAN
UPAYA PEMANTAUAN LINGKUNGAN
LINGKUNGAN
(Environmental Impact)
(Environmental Management Plan)
(Environmental Monitoring Plan)
YANG TERKENA DAMPAK
SIFAT DAMPAK
JENIS DAMPAK
TOLAK UKUR
UPAYA
LEMBAGCA
LOKASI
W
ARA
LEMBAGA
DA
TA
KONSTRUKSI
Mobilisasi alat dan material
-Volume kerusakan jalan
Penga turan berat -PDAM kab. Pengaturan berat memperhatikan Lebak kondisi jalan
-Kemacetan lalulintas pada Sementara rute perjalanan
-Tingkat /gangguan kgalu lan
-pengaturan menghindan a aag iam padat
Pencmara/sng udara/bising
Baku mutu Udara Nainl Nasional
-Kerusakan jalan yang dilalui
-Prasarana /Jalan
-Lalu Lintas
Tetap
Sepanjang Route angkutan
~~~~~Selama
kegiatan dengan cara selalu mengawasi kegiatan sesuai ketentuan
KIMPRASKAB
-Waktu angkutan dengan pengamanan
DITLANTAS
- PDAM kab. Lebak
Lokasi jalan yaa padat
- PDAM kab. Lebak
Pada lokasi Waktu kegiatan yangentasdengan padat pnaaa lalulintas pnaaa
- PDAM
Lokasi IPA' dan sekitar proyek
-waktu kegiatan dengan pengamanan
masyarakat sekitar proyek
Waktu pemakaian alat berat dengan cara mengukur
Mengunakan Udara/Bising
-Pencemaran udara
-Udara
A. PERSIAPAN
-Polusi suara
-Kebisingan
Sementara
Sementara
-Bakumutu -Baku mutu
Sementara
-Baku mutu udara
peralatan bisimeng/eluarkan bising/gas buang ~dan sesuai baku mutu Nasional -Mekanisme teknis pengerijaan antara lain penyiraman air -Penyesuaian dengan kegia tan masyarakatdan pemilihan alat
kab.
Lebak
- PDAM
kab.
LebAk Lebak
BAPEDALKAB
BAPEDALKAB
kebisingan
memenuhi baku
Penggalian pondasi
BAPEDALKAB
mutu suara
-Pekerja
- ir A Environmental Impact9lalulintas
-Longsor
Air
Erosi
~~ ~~
Environmental Impact Assessment for PDAM
Sementara
~
Kecelakaan pekerja
Membangun dinding penahan
-- PDAM kab.
Estetika
-Menutup tanah gamban dan membuat panit air
- PDAM kab. Lebak
,gangguan ~Sementara ~~~~~lauits
Lokasi pondasi IPA
Waktu kegiatan pengawasan
Lokasi pondasi IPA
Waktu kegiatan dengan pengawsn pengawasan
KIMPRASKAB
KIMPRASKAB
2
-Mengatur galian -Transportasi
-Ganngguan laluhntas
Sementara
-Tingkat kemacetan laluhntas
___________
B. PEKERJAAN
PASCA KONSTRUKSI (OPERASI)
Pekerjaan jalan masuk, struktur
Lumpur sedimentasi
Kebisingan (pagar,saluran (pagar ,saluran)
/timbunan bahan ,tidak mengurangi jalan ruas yang
- PDAM Kab. Lebak
~ad a
Waktu kegiatan dengan pengamanan
DITLANTAS _
-penyesuaian pneuinLksIP Baku mutu dengan kegiatan - PDAM Kab. masyarakat dan Lebak ~~~~~~~Bising pmlhnatygmasyarakat p~~~~~~~~~~~~ atygsekitar
Polusi suara
Sementara
- Air
Erosi
Sementara
Estetika ,gangguan lalulintas
-Menutup tanah gahan dan membuat parit air
- PDAM kab. Lebak
Tanah dan air tanah
-pencemaran tanah dan air tanah
Sementara
Baku mutu B3 Nasional
Pengelolaan dan Pengolahan Lumpur Sementasi
-PDAM Kab. Lebak - bagian tugas DED
Environmental Impact Assessment for PDAM
Lo .si asu Poyek IPA
Watpmkin Waktu pemakaian bebasdenan cara mengukur ~~~~esuiiakebisingan
Lokasi IPA daniaaa
_
_
_
_
_
_
BAPEDALKAB
Lokasi IPA
Waktu kegiatan dengan pengawasan
KIMPRASKAB
Proyek IPA
Samphng satu bulan sekali
BAPEDALKAB
30
Tabel 4.2.3. Matrik EMP pipa transmissi air bersih Bonjoleles Ke Sistem Distribusi integrasi (Rangaksbitung & Warunggunung) UWSIEP PDAM Kab. Lebak
1TA1AP
KEGIATAN BERPOTENSI MENIMBULKAN DAMPAK /SUMBER DAMPAK
KOMPONEN LINGKUNGAN YANG TERKENA DAMPAK
(Activity Cause Environ. Impact
DAMPAK YANG AKAN TERJADI
UPAYA PENGELOLAAN LINGKUNGAN
UPAYA PEMANTAUAN LINGKUNGAN
(Environmental Impact)
(Environmental Management Plan)
(Environmental Monitoring Plan)
JENIS
SIFAT
TOLAK
DAMPAK
DAMPAK(
UKUR
UPAYA
LEMBAGA
LOKASl
CARA
LEMBAGA
CR
KONSTRUKSI -selama kegiatan Prasarana rasana
-kerusakan jalan yamg
matri-aluint
material
Mobilisasi alat Mobiisai an Lal aat Linas -LI its
Tetap
-dilewati dan -Kemacetan Kemcetn lalulints
jalan
~~~~~-Tingkat Smenara Smnaa
A. PERSIAPAN Pencemaran udara/bising
___________________
-Pekerja
Kemacetan /gangguan
~~~lalulintas
___________
Udara/Bising
-Volume kerusakan
Sementara
Baku mutu Udara Nasional
Smentra Sementara
Kcelaaan pekerja
Penggahan tanah
Sepanjang route angkutan
-Pengaturan angkutan menghidari jam -jam padat Mengunakan
PDAM Kab. Lebakdiekran
Lokasi yang
peralatan mengeluarkan bising/gas buang dan sesuai baku
PDAM Kab. Lebak
Membangun dinding penahan -Pengaturan
-Transportasi __ _ _ _ _ _ __ _ _
-PDAM Kab. Lebak
_ _ __ _ _ _ _
Gangguan lauits laluhintas _ __ _ _ _ _
Environmental Impact Assessment for PDAM
S t Sementara
pdipriat pdtpnaaa
~~~~mutu Nasional
____________
-Pekrja Longor -Longsor
-Pengaturan berat material dengan memperhatikan kondisi jalan
Tingkat kemacetan laluhintas
__ _ _ _ _ _ __ _ _ _ _ _
dengan menghindari penggalian pada
ja -jam - a p aadata
PDAM Kab. Lebak
n
dengan cara selalP mengawasi kegiaatan sesuai ketentuan Waktu angkutan egnDILNA pengamnaDnLN'A
Pada lokasi tertentu yang padat lalulintas
Waktu kegiatan dengan pengamanan pnaaa
Lokasi/Rute penggalian
Waktu kegiatan egnKlNMPRASKAB pengawasan
Lokasi/Rute pngla penggahan
Waktu kegiatan deanDITLANTAS pengawasan
BAPEDALKAB
PDAM Kab. Lebak
_ _ _ _ _ _ __ _ _ _ _ _ __ _ _
_ _ _ __ _ _ _ _
__ _ _ _ _ __jam
31
B. PEKERJAAN
-Transportasi
-Ganngguan lalulintas
Sementara
l-Pekela
-Longsor
Sementara
Pemasangan pipa transmisi air Bersih
-Mengatur galian /timbunan bahan ,tidak mengurangi jalan ruas yang ada
-Tingkat kemacetan lalulintas
pekerja
dinding penahan
- PDAM Kab. Lebak
Sepanjang pipa transmissi
Waktu kegiatan dengan pengamanan
PDAM Kab.
Sepanjang
Waktu kegiatan
Lebak
lbang aKecelakaan nMembangm pipa dengan transnmissi pengawasan
DITLANTAS
KIMPRASKAB
._
-Udara
-Pencemaran udara
Sementara
-Mekanisme -Baku munu Steknis uBakurat pengerjaan antara lain
- PDAM
kab.
Lebak
penyiraman air _
- Air
Erosi
Environmental Impact Assessment for PDAM
Sementara
Estetika ,gangguan lalunintas
-Menutup tanah -PDAM kab. gahan dan Lebak membuat parit airPDAM
Sepanjang jalur pipa transmisi dan masyarakat sekitar J1 pipa talu pengan
-waktu kegiatan dengan pengamanan
BAPEDALKAB
Waktu kegiatan KIMPRASKAB 32
32
Tabel 4.2.4. Matrik EMP ekspansi system distribusi dan intergrasi system distribusi existing Rangkasbitung dan Warunggunung KEGIATAN BERPOTENSI MENIMBULKAN DAMPAK /SUMBER
0
TAHAP
DAMPAK (Activity Cause Environ. Impact
KOMPONEN LINGKUNGAN
DAMPAK YANG AKAN TERJADI (Environmental Impact)
UPAYA PENGELOLAAN LINGKUNGAN (Environmental Management Plan)
UPAYA PEMANTAUAN LINGKUNGAN (Environmental Monitoring Plan)
YANG
TERKENA DAMPAK
JENIS DAMPAK
SIFAT DAMPAK
TOLAK UKUR LA
UPAYA
LEMBAGA
LOKASI
CARA DA
LEMBAGA
KONSTRUKSI -Prasarana /Jalan
Mobilisasi alat
-Lalu Lintas dan material dan material
-Kerusakan jalan yang dilalui
Tetap
-Kemacetan lalulintas pada Sementara rute perjalanan rute perjalana
-Volume kerusakan jalan
material memperhatikan kondisi jalan
-Tingkat -pengaturan kemacetan angkutan /gangguan mnhdaijamdiekran ~~~~~~~lalu lintas' - jam padat
-PDAM Kab. Lebak
Sepanjang Route angkutan
-PDAM Kab. Lebak
Lokasi jalan adga
Selama kegiatan dengan cara selalu mengawasi kegiatansesuai
padat
-Waktu angkutan dengan pgmnn pnaaa
KIMPRASKAB
DITLANTAS
Mengunakan UdarafBising
A. PERSIAPAN
Baku mutu
peralatan
PDAM Kab.
Padalokasi
Waktu kegiatan
Pencemaran Sementara udara/bising
Udara Nasional
mengeluarkan bising/gas buang dan sesuai baku mutu Nasional
Lebak
tertentu padat laluhintas
dengan dengamnaBPEALA
BAPEDALKAB
-Pencemaran udara
-Baku mutu udara
Lokasi jalur pipa dan masyarakat sekitar proyek
-waktu kegatan pengan
BAPEDALKAB
-Udara
Penggalian galian
-Kebisingan
-Mekanisme Sementara
-Polusi suara
L
-Pekerja 1 -Longsor EnvironmentalImpactAsessment f Longsor
EnvironmentalImpact Assessment for PDAM
Sementara
|
Sementara SPmentara
-Baku mutu udara
teis penger antara lain:Lebak penyiraman air
- PDAM
Kab.
-Penyesuaian dengan kegiatan - PDAM Kab. masyarakat dan Lebak pemtluhansalat dbmasyarakat memenuhi baku mutu suara
Kecelakaan Membangun pekerelakaan dindingpenLebak peke33anngpenahana
-PDAM
Kab.
Lokasi jalur pipa dan
BAPEDALKAB
sekitar proyek
Waktu pemakaian alat berat dengan cara mengukur kebisingan
Lokasi penggalian pipa
Waktu kegiatan dengan pen
KIMPRASKAB
33
-Udara
-Udara-Pencemaran -Pencemaran udara
-Transportasi
-Ganngguan laltintas
Sementara Sementara
-Baku mutu udara
Sementara
-Tingkat kemacetan laluhintas
______________
B. PEKERJAAN
Pekerjaan .pemasangan pipa
Kebisingan
Polusisuara
Sementara
-Mekanisme teknis pengeaan antara lain penyiraman air -Mengatur galian
- PDAM
kab.
Lebak
/timbtuan bahan ,tidak mengurangi jalan ruas yang
- PDAM
~~~~~
~~~ada_
Lebak _
_
_
Kab.
_
_
-penyesuaian Baktu mutu dengan kegiatan - PDAM Kab. Bising masutuakt dbmasyarakat dan Lebak aaapp e g P sra peniilihan alat yg Bising sesuai
-waktu kegiatan dengan pengamanan
BAPEDALKAB
Lokasi masuk Proyek Reservoir
Waktu kegiatan dengan pengamanan
DITLANTAS
Lokasi IPA dan dera sekitar
Waktu pemakaian alat berat dengan mengan kebisingan
_
_
- Air
Erosi
Sementara
Estetika ,gangguan laltdintas
-Menutup tanah galian dan membuat parit air
- PDAM kab. Lebak
Melewati pasar tradisionil)
Semenra
-Pendapata pedagang pedaugan
-oilsidan pegaturan pekerjaan pada jam-jam lenggang
- PDAM
k-Pedagang kPedaaniemntr
Environmental Impact Assessmentfor PDAM
_
Sepanjang jalur pipa jtransmsi dan masyarakat sekitar
Lebak
Kab.
_
_
_
_
_
Jalur pipa transmissi
Lokasi jalur pipa lewat psrpoe p
BAPEDALKO
_
Waktu kegiatan engan pengawsn
KIMPRASKAB
Sebelum dan saat pelaksanaan
PEMDAKAB
34
Tabel 4.3.1. Matrik EMP "Replace older raw water transmision from Paniis"-UWSIEP PDAM Kota Cirebon KEGIATAN BERPOTENSI MENIMBULKAN DAMPAK /SUMBER
TAHAP
DAMPAK (Activity Cause Environ. Impact
KOMPONEN LINGKUNGAN
DAMPAK YANG AKAN TERJADI (Environmental Impact)
UPAYA PENGELOLAAN LINGKUNGAN (Environmental Management Plan)
UPAYA PEMANTAUAN LINGKUNGAN (Environmental Monitoring Plan)
YANG
TERKENA DAMPAK
JENIS DAMPAK
SIFAT DAMPAK
TOLAK UKUR
UPAYA
LEMBAGA
LOKASI
WARA CR
LEMBAGA
KONSTRUKSI -selama kegiatan
Moiiateia material
altdan
A. PERSIAPAN
Prasarana /Jalan
-Kerusakan jalan yamg dilewati
-Ll its -Lalu Lntas
Tetap
-Volume kerusakan jalan
-Pengaturan berat material dengan memperhatikan kondisi jalan
-PDAM Kota Cirebon
Sepanjang route angkutan
-Kemacetan lalulintas
Smnaa Sementara
-Tingkat Kemacetan /gangguan lalutintas
-Pengaturan angkutan menghindari jam -jam padat Mengunakan
-PDAM Kota Cirebon
Lokasi yang diperkirakan d at padat
dengancara selalu mengawasi kegiatan sesuai ketentuan Waktu angkutan dengan penganan pengamanan
Udara/Bising
Pencemaran udara/bising
Sementara
Baku muPtnuearanperalatan Udara mengeluarkan Nasional bising/gas buang dan sesuai bakui mutu Nasional
-PDAM Kota Cirebon
Pada lokasi tertentu yang padat lalulintas
Waktu kegiatan dengan pengamanan pnaaa
-Pekerja
-Longsor
Sementara
-PDAM Kota
Penggalian tanah
Kecelakaan pekerja
Cirebon
_linkatGangguan Galulinan laluhintas
Environmental ImpactjAssessmen5am-jam
Environmental Impact Assessment for PDAM
STingkat Sementara
kemacetan lalulintas
dengan menghindari penggalian pada
Cirebon
DITLANTAS
BAPEDALKO
Waktu kegiatan Lokasi/Rute penggalian
~~~~~~~~~~~~~~-Pengaturan -PDAM Kota
Penggalian tanah -Transportasi -Trasporasi
Membangun dinding penahan
KIMPRASKO
Wan pengawasan
KIMPRASKO
e Wkukgaa Lokasi/Rute penggalian
Waktu kegiatan dna pengawasan
DTLANTAS ILNA
padat
35
-Transportasi
-Ganngguan lalulintas
Sementara
-Mengatur galian
-PDAM Kota
Sepanjang
Waktukegiatan
tidak mengurang jalan ruas yang
Cirebon
pipa transmissi
dengan pengamanan
DITLANTAS
Kecelakaan Membangun dMmn gun na pekeda dinding penahan
-PDAM Kota
Sepanjang lubang pipa transmissi
Waktu kegiatan dengan pengawasan
KIMPRASKO
-Mekanisme
-PDAM Kota
Sepanjang
Cirebon
jalur pipa transmsi dan masyarakat sekitar
kemacetan lalulintas
ada
-Pekeqa B. PEKERJAAN
Pemasangan transnmisi air
-Longsor
Sementara
kelak
pipa
-Udara
-Pencemaran u d a ra
Sementara a
-Baku mutu udara u- a r
teknis pengerjaan aantara lain ___penyiraman
Estetika Air
-
Air ~Erosi
Environmental Impact Assessment for PDAM
Sementara
,gangguan lalulintas
air
-Menutup tanah
~~~~~~~~~~ dan
~
membuat parit air
-waktu kegiatan dengan pengamanan
BAPEDALKO
-PDAM Kota
~~~~~galian Cirebon
Jalur pip at kgaa TdegnKIMPRASKO transmissi pengawasan
36
4.3.2. Matrik EMP Bangunan Penangkapan 3(tiga) Mata air Baru -UWSIEP PDAM Kota. Cirebon KEGIATAN BERPOTENSI MENIMBULKAN DAMPAK /SUMBER
0
TAHAP
DAMPAK (Activity Cause Environ. Impact
KOMPONEN
DAMPAK YANG AKAN TERJADI
UPAYA PENGELOLAAN LINGKUNGAN
UPAYA PEMANTAUAN LINGKUNGAN
LINGKUNGAN YANG
(Environmental Impact)
(Environmental Management Plan)
(Environmental Monitoring Plan)
TERKENA DAMPAK
JENIS DAMPAK
SIFAT DAMPAK
TOLAK UKUR UPAYA TCA KRUAALMAALKS
LEMBAGA
LOKASl
CARA AKTRAN
LEMBAGA EBG
KONSTRUKSI -Prasarana /Jalan
-Volume kerusakan
_ Pengaturanberat material memperhatikan lbRoute
dilalui
jalan
koemperhatlan
-Kemacetan
-Tingka t
-pengaturan
-PDAM Kota
Lokasi jalan
-Waktu angkutan
Sementara
kemacetan
angkutan
Cirebon
yang
dengan
menghindari jam - jam padat Mengunakan
__
diperkirakan padat
pengamanan
___
/gangguan lalu lintas'
peralatan
-PDAM Kota
Pada lokasi
Wkukgna
mengeluarkan bising/gas buang
Cirebon
tertentu yang padat
dengan pengamanan
lalulintas
pnaaa
Lokasi IPA dan masyarakat sekitar proyek
Waktu pemakaian alat berat dengan cara mengukur kebisingan
Lokasi pondasi IPA
nWaktukegiatan pengawasan
-Kerusakan jalan yang
Tetap
-PDAM Kota Cirebon
Sepanjang
Selama kegiatan dengan cara selalu mengawasi
angkutan
kegiatan sesuai
KIMPRASKO
ketentuan Mobilisasi alat
-Lalu Lintas
lalulintas pada
dan material
rute perijalanan ________ ____
______
Udara/Bising Pencemaran Udara/Bising
Pencemaran udara/bising
Sementara
~~Baku mutu Udara Nasional
_
_
_
_
dan sesuai baku A. PERSIAPAN
.Kebisingan .Polusi
suara
Sementar
-Baku mutu udara
mutu Nasional -Penyesuaian dengan kegiatan masyarakat dan pemilihan alat memenuhi baku mutu suara
Kecelakaan pekerja
Membangun dinding penahan
Cirebon
Estetika
-Menutup tanah
-PDAM Kota
Penggalian pondasi
-PDAM Kota Cirebon
_
_
DITLANTAS
p n a a a
BAPEDALKO
BAPEDALKO
-PDAM Kota -Pekerija
-Longsor
Sementara
- Air
Erosi
Sementara
Fgalian gangguan
lalulintas
Environmental Impact Assessment for PDAM
dan
membuat part air
Lokasi
Waktu kegiatan
Galia
dengan
pondasi IPA
pengawasan
KIMPRASKO
SCirebon KO
37
Tabel 4.3.3. Matrik EMP Pembangunan Transmisi utama air dar sumber Baru (Mata air Cibulakan, Cigorowong dan Cikepel) UWSLEP PDAM Kota Cirebon
0
_KEGIATAN BERPOTENSI MENIMBULKAN DAMPAK /SUMBER DAMPAK (Activity Cause Environ. ImpactDAPK
TAHAP
KOMPONEN LINGKUNGAN YANG TERKENA DAMPAK
DAMPAK YANG AKAN TERJADI
UPAYA PENGELOLAAN LINGKUNGAN
(Environmental Impact)
UPAYA PEMANTAUAN LINGKUNGAN
(Environmental Management Plan)
(Environmental Monitoring Plan)
DAMPAK
SIFAT DM K
TOLAK UURCA
UPAYA
LEMBAGA
LOKASIA
CARA
LEMBAGA
KONSTRUKSI
Mobil isasi material
alat
dan
Prasarana /Jalan
jalan yamg dilewati
Tetap
-Lalu Lintas
-Kemnacetan lalulintas
Sementara
kerusakan jalan
-Tingkat Kemacetan /gangguan lalulintas
A. PERSIAPAN Udara/Bising
-Pekerija
udaran udara/bising
-Longsor
Sementara
Bakumutu Udara Nasional
Sementara
Kecelakaan pekera
Penggalian tanah -Transportasi _______________
B. PEKERJAAN B.PEKERJAAN
-Gangguan lalulintas
Sementara
____________
Pemasangan hPeransmisi air
pipa
.
-Transportasi
-Ganngguan laluhntas
_ _ __ __ __ __ __ _ __ __ __ __ __ _ __ __ __ __ __ _ __ __ __ __ __ _ __ __ __ __ __
Environmental Impact Assessment for PDAM
Sementara _ _ __ __ _ __
-Pengaturan berat material dengan memperhatikan kondisi jalan
-PDAM Kota Cirebon
-Pengaturan angkutan menghindari jam -jam padat Mengunakan
-PDAM Kota Cirebondprian
peranPencemaran peralatan mengeluarban bising/gas buang dan sesuai baku mutu Nasional
-PDAM Kota Cirebon
-PDAM Kota Membangun Cirebon dindin enahan pekerJa penahan dmdmg -Pengaturan
-PDAM Kota
Tinmgka t kemacetan lalulintas
dengan menghindanr penggahian pada
Cirebon
____________
j___________________ -jam padat padat
-Tingkat kemacetan lalulintas
. route angkutan
Lokasi yang diperkrakan padat
Waktu angkutan degn dengan an pengamanan
Pada lokasi tertendt yang padat lalulintas
Waktu kegiatan dengan pnaaa pengamanan
Lokasi/Route penalian penggahan
Wkukgaa Waktu kegiatan dengan pengawasan
Lokasi/Route penggahan
dengan Wan pengawasan
Sepanjang pipa transmissi
Waktu kegiatan dengan pengamanan
lam
-Mengatur galian
-PDAM Kota
/timbunan bahan ,tidak mengurangi jalan ruas yang a daa
CPrebot
-selama kegiatan dengan cara selalu mengawasi kegiatan sesuai ketentuan
__ _ ___ _ ___ _ ___ _ ___
KIMRASKO
DITLANTAS
BAPEDALKO
KIMPRASKO
DkegiNTaS DITLANTAS
DIANTAS
___ _ ___ _ _
_ad
38
4.3.4. Matrik EMP
0
TAHAP
KEGIATAN BERPOTENSI MENIMBULKAN DAMPAK /SUMBER DAMPAK Environ. Impact
KONSTRUKSI
KOMPONEN LINGKUNGAN YANG TERKENA DAMPAK
Pembangunan IPA Aerasi dan disinfeksi UWSIEP PDAM Kota Cirebon DAMPAK YANG AKAN TERJADI (Environmental Impact)
JENIS
SIFAT
TOLAK UKUR
UPAYA PENGELOLAAN LINGKUNGAN (Environmental Management Plan)
UPAYA
LEMBAGA
UPAYA PEMANTAUAN LINGKUNGAN (Environmental Monitoring Plan)
LOKASI
WAKTU DAN
LEMBAGA
P
-Prasarana
-Kerusakan -Prasarana -Kerusakan
/Jalan
jalan yang dilalui
Tetap
-Volume -Volume
Pengaturan berat material
kerusakan jalan
materi a n kondisi jalan
-PDAM Kota Cirebon
kondisi -Kemacetan
Mobilisasi alat
-Lalu Lintas
dan material
lalulintas pada
Sementara
rute perjalanan
Selama kegiatan dengan cara
Route angkutan
selalu mengawasi kegiatan sesuai
KIMPRASKO
~~~~~~~ketentuan_______
-Tingkat
-pengaturan
-PDAM Kota
Lokasi jalan
-Waktu angkutan
kemacetan
angkutan
Cirebon
yang
dna
/gangguan lintas'
menghindari jam - jam padat
diperkirakan padat
pengamanan
~~lalu
____________ ____________
jalan
Sepanjang
DITLANTAS
pnaaa
Mengunakan Udara/Bising
Pencemaran udara/bising
Sementara
Baku mutu Udara Nasional
A. PERSIAPAN
Penggalian pondasi -Kebisingan
-PDAM Kota Cirebon
Pada lokasi tertentu yang padat lalulintas
Waktu kegiatan dengan
Lokasi IPA'
-waktu kegiatan
BAEAK
Lokasi IPA dan masyarakat
Waktu pemakaian alat berat dengan cara mengukur
BAPEDALKO
sekitar proyek
kebisingan
BAPEDALKO BAPgaALKa
pengamanan
~~~~mutu
__________________ ______________
-Udara
peralatan mengeluarkan bising/gas buang dan sesuai baku N asional -Mekanisme
-Udara -Pencemaran
-Pencemaran udara
. -Polusi suara
Sementara
Sementara
Sementara
Baku mutu
-Baku mutu udara
-Baku mutu udara
teknis
pengerjaan antara lain: -Penyesuaian dengan kegiatan masyarakat dan pemilihan alat
-PA
Cirebon
oa
-PDAM Kota Cirebon
memenuhi baku
dan sekitar proyek
dengan pengamanan
BAPEDALKO
mutu suara -PDAM Kota -Pekerja
-Longsor
Environmental Impact Assessment for PDAM
Sementara
KecelaRSan
pekenma
Membangun
dinding penahan
Cirebon
Wkukgaa Lokas
pondasi IPA
KO
dengawn
39
- Air
-Transportasi
Erosi
Sementara
aun
Sementara lalulintas
B. PEERJA i 5ak sWukr B. PEKERJAAN Pekerjaan jalan B. PKERAAN masuk, struktur (pagar ,saluran)
PASCA KONSTRUKSI (OPERASI)
Kontrol Kualitas air Produksi(air Minun)
4
Kbisinan
Estetika ,gangguan laluintas
-Menutup tanah galian dan membuat part air
-PDAM Kota Cirebon
-Tingka t kemacetan
-Mengatur galian tidak mengurangi jalan ruas yang
-PDAM Kota Cirebon
~~~~~ ,tida*nhmenguangi
~~~ada__
~lalulintas
_____________
alusintuas
_
_
_
-PDAM Kota otoan Cirebon
Kebisingan
Polusi suara
Sementara
akmuu Bkmuu Bising
- Air
Erosi
Sementara
Estetika gangguan lalulintas
-Menutup tanah gamban dan membuat parit air
Konsumen
-Kesehatan Konsu
Sementara
Kepmemkes Baku mutu Air Mmimum
P Pengolahanair iran dan bDAM kS
Environmental Impact Assessment for PDAM
_
-penyesuaian dengan kegia tan masyarakat dan pemilihan alat yg sesuai
Lokasi Galian pondasi IPA
Waktu kegiatan dengan pengawasan
KIMPRASKO
Wakt Lokasi masuk PrykIA __
_
_
_
_
Prye IP
_
kenganatan pengamanan _
DITLANTAS
ena
dPA iIP danaltbrat masyarakat sekitar
Wakatu bematkdenan dengan caamnur kebisingan
-PDAM Kota Cirebon
Lokasi IPA
Waktu kegiatan dengan pengawasan
-PDAM Kota Cirebon.
Outalet
BAPEDALKO
KIMPRASKO
sali
DISKESKO
40
Tabel 4.3.5. Matrik EMP KEGIATAN BERPOTENSI 0
TAHAP
MENIMBULKAN DAMPAK /SUMBER
DAMPAK
(Activity Cause
KOMPONEN LINGKUNGAN YANG
Ekspansi sistem distribusi - UWSIEP PDAM Kota Cirebon
DAMPAK YANG AKAN TERJADI (Environmental Impact)
UPAYA PEMANTAUAN LINGKUNGAN (Environmental Monitoring Plan)
UPAYA PENGELOLAAN LINGKUNGAN (Environmental Management Plan)
TERKENA
DAMPAK
Environ. Impact
JENIS DAMPAK
SIFAT DAMPAK
TOLAK UKUR
UPAYA
LEMBAGA
LOKASI
CARA
LEMBAGA
KONSTRUKSI -Prasarana /Jalan
Mobilisasi alat
dan material
-Lalu Lintas
dan material
-Kerusakan jalan yang dilalui
-Kemacetan lalulintas pada
Tetap
-Volume kerusakan
Pengaturan berat material memperhatikan
jalan
kondisi jalan
-Tingkat
-pengaturan angkutan
/gangguan lalu lintas'
-mnhdaijam jam amlalu padat
Sementara
rute rute pedalanari perialanan
- PDAM Kota Cirebon.
- PDAM Kota Cirebon.
Sepanjang Route
Selama kegiatan dengan cara selalu mengawasi
angkutan
ketentuan
Lokasi jalan dekairgan yang
-Waktu angkutan dengan
dpriaa padat
egnaa pengamanan
KIMPRASKO
DITLANTAS
Mengunakan Udara/Bising
Pencemaran udara/bising
Sementara
Bakut mutu
peralatan
Ba Nasional
mengeruarkan bising/gas buang
-PDAM
Kota
Cirebon.
dan sesuai baku
Pada lokasi
Waktu kegiatan
tertentu yang padat
dengan pengamanan
lalulintas
pnaaa
BAPEDALKO
mutu Nasional -Mekanisme
-Udara
A. PERSIAPAN
-Pencemaran udara
Sementara
-Baku mtutu udara
teknis pengerjaan antara lain :
-
PDAMnK
Lokasi
CiAMebon. ieo.
pipa dan masyaralat
-waktu kegiatan dengan
sekitar proyek
pengamanan
Lokasi jalur
Waktu pemakaian
pipa dan
alat berat dengan
penyiraman air
-Penyesuaian dengan kegia tan Penggalian galian
-Kebisingan
-Polusi suara
Sementara
-PDAM
Kota
Cirebon.
jalur
-Baku mutu
masyarakat dan
udara
pemilihan alat
msaaa
memenuhi baku
sekitar proyek
kebisingan
Lokasi penggalian
Waktu kegiatan dengan
BAPEDALKO
BAPEDALKO
aamnuu
mutu suara
Kecelakaan -PekerJa
-Longsor
Sementara
Membangu dindingupna Mekbaa
pekeviardindnngenenahaaljalur
Environmental Impact Assessment for PDAM
- PDAM Kota
Cirebon.
pipa
KIMNRASKO
pengawasan
41
-Udara
B. PEKERJAAN |Pekerjaa pemasangan pipa
-Pencemaran udara
Sementara
-Budara
-Transportasi
-Transportasi -Ganngguan lalulintas
Sementara Sementara
-Tingkat kemacetan lalulintas
Kebisingan Keiign
PolusiBsuara Pls taa
Sementara Smnaa
Baku mutu Bising
-Mekanisme teknis pengerijaan antara lain penyiraman air -Mengatur galian /timbunan bahan ,tidak mengurangi jalan ruas yang ada -penyesuaian masyaakeiatdan masy araatdn pemilihn
alt
Estetika
PASCA KONERA
Kontroh KSI)
Baku
Mutu Air linum
Erosi
Sementara
Melewati pasar
-Pedagang
Sementara
tradisionil)
kctmenutrun
K
smen
gangguan laluhintas
-Pendapat an peda gang
-kesehatan
SmKepmmkes
Konsumen
a
EnvironmentalImpact Assessment for PDAM
ir
mut
-waktu kegiatan dengan pengamanan
BAPEDALKO
Kota Cirebon.
Lokasi masuk Proyek Reservoir
Waktu kegiatan dengan pengamanan
DITLANTAS
PDAM Kta Cirebon a Crbn
Lokasi IPA dan masyarakat
Waktu pemakaian alat berat dengan cara mengukuLr
seki ta r
kebisingan
Kota Cirebon.
- PDAM
y
sesuai
-Air
Sepanjang jalur pipa transmsi dan masyarakat sekitar
- PDAM
-Menutup tanah membuat pant
-Sosialisasi dan pengaturan
_ _
_
_
_
_
_
_
_
BAE _
- PDAM
_
LK
_
_
_
_
_
Kota Cirebon.
transm ssi
Waktu kegiatan dengan pengawasan
KIMPRASKO
Kota Cirebon.
Lokasi jalur Lo lewat
Sebelum dan saat pelaksanaan
PEMII
-PDAM
pekerjaan pada jam-jam lenggang
Cieo.ppasear
Pengoeahar aa
P
dan bahan kinra
Cirebon.
Kota
psrpoe
proeakannPE
KBak
Sa
Konsume2
bulan sekati
AK
ingseat
42
_
Tabel 4.4.1. Matrik EMP Pengembangan Pipa Transmissi dari Intake Penepat - IPA Iman Bonjol 'D 800 mm termasuk 3 stasiun pompa & modifikasi intake Penepat ,UWSIEP PDAM Pontianak NO
TAHAP (Sltage)
I
KEGIATAN BERPOTENSI MENIMBULKAN DAMPAK/SUMBER DAMPAK (Activity Cause Environ. Impact)
KOMPONEN LINGKUNGA N YANG TERKENA DAMPAK
DAMPAK YANG AKAN TERJADI (Environmental Impact) JENIS DAMPAK
SIFAT DAMPAK
TOLAK UKUR
UPAYA PENGELOLAAN LINGKUNGAN (Environmental Management Plan) UPAYA LEMBAGA
UPAYA PEMANTAUAN LINGKUNGAN (Environmental Monitoring Plan) LOKASI WAKTU DAN LEMBAGA CARA
KONSTRUKSI
Pengaturan Prasarana/ Jalan
Kerusakan jalan yang dilewati
Voliume kerusakan jalan
Tetap
berat material dengan memperhatika n kondisi jalan
-PDAM Kota Pontianak
Sepanjang
Selama
Roue utedengan pengangkuta
kegiatan selalu mengawasi kegiatan
KIMPRASKO
Mengunakan
A. PERSIAPAN
-Mobilisasi
alat dan
material
Pencemaran Udara/Bising
udara/bisin
Sementara
udara/bising
Bakumutu pengeluartan BauBuuAPEDALkn
P MPada PDMKetetO
Udara
Pontianak
~~~Nasional
bising/gas
buang dan
lokasi ryangpdat
Waktu eiaa degan
yangl pada
dengamna
Loangjaa diperkirakan
Wkt -ankutun denganDIATA
padat
pengamanan
Sepanjang jalur pipa
Wakt k atu
transmisi dan masyarakat
egiatan dengan
BAPEDALKO
sesuai baku mutu Nasional
-Lalu Lintas
-Udara
-Kemacetan lalulintas -ada Sementara pada rute ~
-Tingkat kemacetan /gangguan
perjalanan
lalu lintas'
-pengatuanLoaijln angkutan menghindari ja -. a padat
-Pencemaran udara
Baku mutu Udara Nasional
Mekanisme teknis Pengeijaan al: bila perlu
Sementara
- PDAM
Pontianak
-PDAM Kota Pontianak
penyiraman air - Pengalian lubang tanah
tanah gahian
~tanah
B. PEKERJAAN PIPA
-Erosi
~
~
Sementara
~
~
laluhntas esetka
tanahdari galian jauh aliran
Membangun
TRANSMISSI
-Pekerja
-Longsor
Sementara
pekerja pekerja
-Pemasangan tiang pancang pondasi
-kebisingan
Waktu Pontianak
jalur rasl pipa
air permukaan
__________,
Te adi kebisingan
Sementara
Baku mutu udara Nasional
Sepanjang
Waktu Watan
penahan
tas-si
dna pengawasan
Penyesuaian
Seapanjang
Wakt
jalur a syar
pemakaian alat berat dengan cara
dan pemilihan bising yang
KIMPRASKO
pengawasan
-PDAM kota
tnPontanak Supdean
sesuai
EnvironmentalImpact Assessmentfor PDAM
kegiaan dengan
dinding
dengan masyarakat dasyaran
KIMPRASKO
sekitar
Menempatkan -Jalan, air galian ~ ~
DITLANTAS
-PDAM Kota Ponanak
sekitar
mnuu keisnganu mengan
KIMPRASKO
BAPEDALDA KOTA
E
PASCA KONSTRUKSI (OPERASI)
Kontrol baku mutu Air baku
-Konsuen
-Kesehatan Konsmen
Environmental Impact Assessment for PDAM
Sementara
Kepmen Kes Baku Mutu Air Minum
Respon Pengolahan Air dan bahan kimia
-PDAM Kota Pontianak
Intake Panepat
Penngambila n Sampel lx buan
DISKESKO
45
4.4.2. Matrik EMP Pengembangan pipa transmissi air minum dari Imam Bonjol ke Sei Jawi ( Reservoir Booster Pump Rambutan ) 4) 600 mm
UWSIEP -
KEGIATAN BERPOTENSI MENIMBULKAN DAMPAK /SUMBER
JO
TAIIAP
I
KOMPONEN LINGKUNGAN YANG
DAMPAK
TERKENA
(Activity Cause Environ. Impact
DAMPAK
PDAM Pontianak
DAMPAK YANG AKAN TERJADI (Environmental Impact)
JENIS
SIFAT
DAMPAK
DAMPAK
UPAYA PENGELOLAAN LINGKUNGAN (Environmental Management Plan)
TOLAK UKUR
UPAYA
LEMBAGA
UPAYA PEMANTAUAN LINGKUNGAN (Environmental Monitoring Plan)
LOKASI
WAKTU DAN
LEMBAGA
CARA
KONSTRUKSI______
____
Pengaturanberat -Prasarana /Jalan
-Kerusakan jalan yang dilaltui
Tetap
-Volume kerusakan jalan
Pengaturan berat memperhatikan kondisi jalan
-Tingkat
-pengaturan
kemacetan
angkutan
/gangguan
- iam padat
Selama kegiatan -PDAM Pontianak
Sepanjang Route angkutan
Mobilisasi alat
-Lalu Lintas
dan material
lalulintas pada rute peijalanan
Sementara
KIMPRASKO
~~~~~~~ketentuan
kondisi jalan -Kemacetan
dengan cara selalu mengawasi kegiatan sesuai
- PDAM Kota Ponjeanak
Lokasi jalan
-Waktu angkutan
yang
dengan pengamanan
padat
DITLANTAS
Mengunakan Udara/Bising
Pencemaran
udara/bising
Sementara
Baku mutu Udara
Nasional
peralatan mengeluarkan
bising/gas buang
PDAM Pontianak
dan sesuai baku mutht Nasional -Mekanisme
-Bakumutu A. PERSIAPAN
Pend ahan tanah
-Udara
-Pencemaran udara
Sementara
-Baku mubu
-Kebisingan -Kebisingan
-Polusi suara -Polusi suaa
Sementara emntra
-Baku mutu udara
teknis
-PDA
dengan kegiatan
- PDAM
masyarakat dan pemilihan alat memenuhi baku
dan timbunan
mt
tanah galian
mutu suara -Pekerja
- Air
-Longsor
Erosi
Environmental Impact Assessment for PDAM
Sementara
dMndbng penahan
-Longsor pekeija
dinding penahan
Estetika ,gangguan lalulintas
Kota ak
Kota
Pontianak
Waktu kegiatan
padat
pengamna
lalulintas
pengamanan
jaurppandang
-waktu kegiatan
msyrka Iat sekitar proyek
dengan pengamanan
Sepanjang
Waktu pemakaian
jalur pipa dan masyarakat sekitar proyek
alat berat dengan cara mengukur kebisingan
Sepanjang jalur pipa
Waktu kegiatan dengan
BAPEDALKO
BAE
LK
BAPEDALKO
ur
pekeea
Sementara
- PDAM
pengeraaan antara lain penyiraman air -Penyesuaian
Pada lokasi tertentu yang
-Menutup tanah gatian dan membuat part air
-PDAM kota Pontianak
KIMPRASKO
~~~~~~~yang digali pengawasan PDAM kota Pontianak
Sepanjang jalur pipa yang digali
Waktu kegiatan dengan pengawasan
KIMPRASKO
46
-Transportasi B. PEKERJAAN
-Ganngguan lalulintas Sementara B.aPEKERJAaN
-Tingkat kemacetan lalulintas
-Mengatur galian /timbunan bahan ,tidak mengurangi jalan ruas yang
-PDAM Kota Pontianak
Sepanjang jalur papa
Waktu kegiatan dengan pengamanan
ada
Pemasangan pipa transnmisi Baku mutu Kebisingan
Polusi suara
Sementara Bising
ada -pneuinWaktu dengan kegiatan masyarakat dan pemilihan alat yg sesuai
Environmental Impact Assessment for PDAM
DITLANTAS ______
-PDAM Kota Pontianak
Sepanjang jalur pipa transmissi
pemakaian alat berat dengan cara mengukur kebasmngun
BAPEDALDA KO
kebisingan
47
Tabel 4.4.3. Matrik EMP dari Peningkatan kapasitas IPA Sei Jawi Luar 50 lps - UWSIEP PDAM Pontianak
4O
I
TAHAP
KEGIATAN BERPOTENSI MENIMBULKAN DAMPAK /SUMBER DAMPAK (Activity Cause Environ. Impact
KOMPONEN LINGKUNGAN YANG TERKENA DAMPAK
DAMPAK YANG AKAN TERJADI (Environmental Impact)
JENIS
SIFAT
DAMPAK
DAMPAK
UPAYA PENGELOLAAN LINGKUNGAN (Environmental Management Plan)
TOLAK UKUR
UPAYA
UPAYA PEMANTAUAN LINGKUNGAN (Environmental Monitoring Plan)
LEMBAGA
LOKASI
WAKTU DAN
LEMBAGA
CARA
KONSTRUKSI -Prasarana
-Kerusakan
/Jalan
jalan yang dilalui
Penga turan Tetap
-Kemncean Mobilisasi alat dan material
-Lalu Lintas
lalutntas jala menujtu IPA
kemacea Sementara
t
-Volume
Penaterian
kerusakan jalan
memperhatikan kondisi jalan
-Tingkat
-pengaturan
ert
auits/gangguan lalu lintas'
-
Selama kegiatan
- PDAM
Kota
Sepanjang
dengan cara
jalan menuju IPA
selalu mengawasi kegiatansesuai
Lokasi jalan
-Waktu angkutan
Pontianak Kontraktor
yang padat
dengan pengamanan
Pontianak
PDAM Kota
laluhinda jam padat
yn
KIMPRASKO
Wkuagua
DITLANTAS
Mengunakan
Pencemaran Udara/Bising
Pencemaran
udara/bising
Sementara
~~~~Baku mutu
peralatan
PDAM
Pada lokasi
Waktu kegiatan
Udara
mengeluarkan
Pontianak
tertentu yang
dengan
PDAM
Lks P dLoasi PA
-waktu kegiatan
BAE
Pontianak
masyarakat
dengan pengamanan
BAPEDALKO
Nasional
A. PERSIAPAN
-Mekanisme -Baku teknis mutu -Pencemaran udara
a-Baku -Kebisingan
Sementara
udara SK
mutu -Polusi suara
Sementara
udara
peknigsaan antara lain
r
-Penyesuaian dengan kegiatan masyarakat dan pemilihan alant
sekitar proyek - PDAM
. Pontanak
memenuhi baku mutu suara -Pekeda
padat lalulintas
BAPEDALKO
dengamna pnaaa
mutu Nasional
-Udara
Penggalian tanah dan timbunng tanah galian
bising/gas buang dan sesuai baku
-Longsor
Sementara
Lokasi IPA dan masyarakat
Waktu pemakaian alat berat dengan cara mengukur
sekitar proyek
kebisingan
Kecelakaan
Membangun
-PDAM
pekerja
Lokasi
dinding penahan
pontianak
Waktu kegiatan
penggalian di
dengan
intake
pengawasan
LK
BAPEDALKO
KMPA
O
-Mengatur galian B. PEKERJAAN
Pekeraan jalan
masuk, struktur
-Ganngguan
-Transportasi
(pagar ,saluran) __ __ _ __ _ __ __ _ __ _
lGanuintan laluhntas
_ __ __ __ __ __ __
Environmental Impact Assessment for PDAM
Sementara
-Tingkat
/timbunan bahan
kemacetan
,tidak mengurangi
lalulintas
jalan ruas yang a d aa_
_ __ _ __ __ __ _ _
- PDAM
Pontiank
Lokasi masu
Proyek IPA
Waktu kegiatan
dengan
DITLANTAS
pengamanan _ _ ___ _ ___ _ ___ _ ___ _ ___ _ ___ _ ___
__ _ __ _ __ __a
48
PASCA KONSTRUKSI (OPERASI)
Lumpur sedimentasi
Tanah dan air tanah
peemrnPengelolaan tpenmaran tanah tanab
Environmental Impact Assessment for PDAM
dan Baku mutu B3 Nasional
Pengolahan Lumpur
-PDAM
Pontianak bagian tugas ~~~~~~~~~Sementasi DED
ProyekIPA
Sampling satu bulan sekali
BAPEDALKO
49
Tabel 4.4.4. Matrik EMP Optimasi pipa transmissi air bersih imam Bonjol - selat Panjang dan Ekspansi/optimasi sistem distribusi) UWSIEP PDAM Kota Pontianak
0
KEGIATAN BERPOTENSI MENIMBULKAN DAMPAK /SUMBER DAMPAK
TAHAP
Activity Cause Environ. Impact
KOMPONEN LINGKUNGAN YANG TERKENA DAMPAK
DAMPAK YANG AKAN TERJADI (Environmental Impact)
JENIS DAMPAK
SIFAT DAMPAK
TOLAK UKUR
UPAYA PENGELOLAAN LINGKUNGAN (Environmental Management Plan)
UPAYA
LEMBAGA
UPAYA PEMANTAUAN LINGKUNGAN (Environmental Monitoring Plan)
LOKASI
CARA CR
LEMBAGA
KONSTRUKSI -selama kegiatan Prasarana /jalan
-kerusakan jalan yamg dilewati
Tetap
-Volurne keruIakan jalan
-Pengaturan berat -PDAMSeajn menerisaik an Pontianakroute kompdisaikaan kondisi jalan
-Tingkat Kemacetan /gangguan
-Pengaturan angkutan menghindari jam -jam padat Mengunakan
-PDAM Pontianak
peralatan mengeluarkan bising/gas buang dan sesuai baku
angkutan
dngncr selalu KIMPRASKO mengawasi ~~~~~~~~kegiatan sesuai ketentuan
Mobilisasi material
alat
dan
-Lalu Lintas
-Kemacetan lalulintas
Sementara
lalulintas
Udara/Bising A. PERSIAPAN
Pencemaran Pencemaran Sementara udara/bising
~~~Baku mutu Udara Nasional
Lokasi yang diperkirakan padat
Waktu angkutan dengan an pengamanan
PDAM Pontianak
Pada lokasi tertentu yang padat lalulintas
Waktu kegiatan dengan pnaaa
BAPEDALKO
-PDAM Pontianak
Lokasi/Rute Lokan
Waktu kegiatan dengan pengawasan
KIMPRASKO
Waktu kegiatan dengan pengawasan
mutu Nasional
-Pekerja
-Longsor
-Transportasi
-Gangguan - lalulintas
Sementara
Kecelakaan pekerja
Sementara
-Tigkat kemacetan laluhintas
dengan menghindari penggalian pada jam-jam padat
-PDAM Pontianak
Lokasi/Rute penggaian
-Pendapat an pedagang menurun
-Sosialisasi dan pengaturan pekerjaart pada jam-jam lenggang
-PDAM -PDAn Ponalke-asar
-Pasar yang yange
Membangun dinding penahan -Pengaturan
Penggalian tanah
- Pedagang
kecil kaki lima
-Aktivitas perdagangan terganggu
EnvironmentalImpact Assessment for PDAM
Sementara
-Sebelum dan saat pelaksanaan
DTLNA DITLANTAS
PEMDAKO
proyek
50
B. PEKERJAAN
PASCA KONSTRUKSI (OPERASI)
Pemasangan distribusi
Mtitu Kualitas Minum
pipa -Pekerja
-Longsor
Sementara
Kesehatan masyarakat
S
Konsumen
air
EnvironmentalImpact Assessment for PDAM
t
Kecelakaan peke
Kepmen Kesehatan
Membangun | didig p ha
Respon treatment air dan bahan kimia
-PDAM Pontianak
Lokasi/Rute |eLgkaian
-PDAM Pontianak
Kran air konsumen
Waktu kegiatan dengan pengawasan
KIMPRASKO
Pengambilan sample air 1 bulan sekali
DIS KES KO
51
Tabel 4.4.5. Matrik EMP dari
pembangunan reservoar sistem distribusi reservoar baru 2 x 1000 m3 , Reservoir X (pontianak Utara) lokasi j1.*Budiutomc
Gg.Darmaputra dan reservoir VII ( Pontianak Barat ) di Ji. Yos Sudarso Kelurahan sei Baliung- UWSIEP PDAM Kota Pontianak
iO
KEGIATAN BERPOTENSI MENIMBULKAN DAMPAK /SUMBER DAMPAK
TAIIAP
( Activity Cause Environ. Impact _
KOMPONEN LINGKUNGAN
DAMPAK YANG AKAN TERJADI (Environmental Impact)
UPAYA PEMANTAUAN LINGKUNGAN (Environmental Monitoring Plan)
UPAYA PENGELOLAAN LINGKUNGAN (Environmental Management Plan)
YANG
____________
TERKENA DAMPAK
DAMPAK
SIFAT
TOLAK UKUR
UPAYA
LEMBAGA
LOKASI
CARA
LEMBAGA
KONSTRUKSI -Prasarana /Jalan
-Kerusakan jalan yang dilalui
Tetap
Mobilisasi alat dan material -Kemacetan -Lalu Lintas
-Udara
lalulintas pada rute perjalanail
-Pencemraran
~~~~~udara
A. PERSIAPAN
Sementara
Sementara
-Volume kerusakan
Pengaturan berat memperhatikan
jalan
kondisi jalan
-Tingkat
-pengaturan
kemacetan /gangguan
angkutan menghindari jam
lalu lintas'
-
-Baku mutu
-Mekanisme
udara
jam padat
IMkrd
- PDAM
Pontianak
- PDAM
Pontianak
PDA
Sepanjang Route
Selama kegiatan dengan cara selalu mengawasi
angkutan
ketentuansesuai
Lokasi jalan
-Waktu angkutan
yang diperkirakan
dengan pengamanan
padat
pnaaa
Loas
- PDAM
Reservoir dan
KIMPRASKO
DITLANTAS
akegiatan
antara lain :Pnaak
masyarakat
dna
penyiraman air
sekitar proyek
pengamanan
Lokasi
Waktu pemakaian
sekitar proyek
kebisingan
Waktu kegiatan
BAPEDALKO
-Penyesuaian
Penggalian galian Penbisingan -Kebisingan
galiani suara -Polusi suara
Sementara Sementara
-Baku mutu udara
dengan kegiatan masyarakat dan pemilihan alat
-PDAM
Pontianak
memenuhi baku mutu suara
Kecelakaan -Pekerja
B. PEKERJAAN
Pekerjaan jalan
-Longsor
-Transportasi
lanuginas _____________
PASCA
Knue Baku
KONSTRUKSI
Kontrol
(OPERASI)
Mutu Air Minul
Sementara
Mebanun
-PDAM
Lokasi
dinding eekerak penahan
Pontianak
penggalian di
-Mengatur galian /ltimbunan bahan
- PDAM
pekeria dinding penahan
-Gngun-Tingkat
masuk, struktur (pagar ,saluran)
11
Sementara
kemacetan lalulintas
,tidak mengurangi jalan ruas yang ada
Baku mutu
Pengolahan air
Air Mimum
dan bahan kinia
___________
ksatnKepmemkes tkwhatan
Konsumen
Rservoir dan masyarakat
Pontianak
~~~reservoir
alat berat dengan cara mengukur
BAPEDALKO
KIMPRASKO
dengan
pengawasan
Lokasi masuk
Waktu kegiatan
Proyek Reservoir
dengan pengamanan
DITLANTAS
Lokasi
Sampling satu
BAPEDALKO
Reservoir
bulan sekali
-PA SKonsmen Sementara
Pontianak - bagian
tugas
DED
EnvironmentalImpact Assessment for PDAM
52
Tabel4.5.1. Matrik EMP dari Pengembangan Pipa Transmissi air baku di Tabuk Pemiatang Panjang: dari kapasitas 900 L/det. ineijadi 127S.L/det. ( Pembangunan Intake Air baku dan penambahan pompa di tabuk Pematang panjang )- UWSIEP PDAM Banjarmasin KEGIATAN BERPOTENSI MENIMBULKAN NO
TAHAP
(Stage)
KOMPONEN LINGKUNGAN
UPAYA PENGELOLAAN LINGKUNGAN (Environmental Management Plan)
UPAYA PEMANTAUAN LINGKUNGAN (Environmental Monitoring Plan)
TERKENG
DAMPAK /SUMBER
DAMPAK ( Activity Cause
TERKENA DAMPAK
Environ. Impact) I
DAMPAK YANG AKAN TERJADI (Environmental Impact) JENIS
SIFAT
TOLAK
DAMPAK
DAMPAK
UKUR
UPAYA
LEMBAGA
LOKASI
WAKTU DAN
LEMBAGA
KONSTRUKSI
Prasarana/ Jalan
Kerusakan jalan yang dilewati
Volume kerusakan jalan
Tetap
_______________
A. PERSIAPAN
- Mobilisasi
alat dan
material
-Udara/Bising
matenal
Pencemaran udara/bising udara /bising
-Udara
-Pengalian Pondasi -Pengalian Pondasi -Air B. PEKERJAAN INTAKE & POMNA
-Pekerja
lalulintas pada rute perjalanan
udara
~~~~Selamia Sepanjang Rute pengangkutan
kegatan dengan selalu megawan kegatan
peralatan mBaku mesngegasarkang bising/gas buang dan sesuai baku mutu Nasional
PDam Banjarmasin
Pada kang tertentu yang padat lalulintas
kegiatan denganBAE dna pengamanan
-Tingkat
-pengaturan
- PDAM
Lokasi jalan
-Waktu
Sementara
kemacetan /gangguan lalu lintas'
angkutan menghindari jam - jam padat
yang diperkirakan padat
angkutan dengan pengamanan
Baku mutu
Mekanisme
Lokasi Intake
Waktu
Sementara
Udara Naioal
Banjarmasin teknis Pengerlaan al: bila perlumayrka penyiraman air
masyarakta
degiatan dnn pengamanan
udara~
~
-Erosi
Sementara
-Longsor
Sementara
Udara ~~~~Nasional
~~~~~~~~~~~Kekeruhan Menempatkan air ermukaan
tanah galian jauh dari aliran air permukaan
Kecelakaan
Membangun
Banjarmasin
-PDAM
sekitar
-PDAM BanjarMasin
Lokasi intake
-PDAM BanM
Lokasi penggalian di
Waktu kegiatan dengan pengawasan Waktu kegan
intake
dengan
pekeda dinding penahan
KIMPRASKO
~~~~~~k egiatan
_________________
Mengunakan mutu
Sementara
-Kemacetan -Lalu Lintas
_____________
Pengaturan berat -PDAM Pengaan berat material dengan Banjarmasin memperhatikan kondisi jalan
BAPEDALKO LK
DITLANTAS
BAPEDALKO
BAPEDALKO
KIMPRASKO
pengawasan
- eaagntag Pmansangan tand pancang pondasi
11
KONSTRUKSI (OPERASI)
PASCA Baku mutu air baku
-kebisingan
kebisingan
.. Terjadi Sementara
~~~~~~~~~Ke-sehatan Konsumen
konsumen konsumen
Environmental Impact Assessment for PDAM
Sementara
-PDAM
Lokasi intake dan
Waktu pemakaian
Baku Mutu
Penyesuaian
Nasa Nasional
jarmasin masyarakat dan pemilihan bising yang sesuai yang sesual
masyarakat sekitar
alat berat dengan cara mengukur kebisingan
Kepmen Kesehatan Kesehatan
tReatenp irdn breatment air dan bahan kimia
Air sungai i intake Intake
Pengambilan sample a I bulan sekali
-PDAM -PDAM BanJarmasin
BAPEDALKO
DISKES KO
53
Tabel 4.6.1. Matrik EMP Pembangunan pipa transmisi air baku dari Kran induk Somba opu ke IPA Baru Panaikang UWSIEP PDAM Kota Makassar KEGIATAN BERPOTENSI MENIMBULKAN DAMPAK /SUMBER DAMPAK (Activity Cause Environ. Impact
TAHAP
KOMPONEN LINGKUNGAN YANG TERKENA DAMPAK
DAMPAK YANG AKAN TERJADI (Environmental Impact)
DENIS
SIFAT
TOLAK
UPAYA PENGELOLAAN LINGKUNGAN (Environmental Management Plan)
UPAYA
LEMBAGA
UPAYA PEMANTAUAN LINGKUNGAN (Environmental Monitoring Plan)
LOKASI
CARA
LEMBAGA
KONSTRUKSI -selama kegiatan Prasarana IJalan
Mobilisasi material
alat
A. PERSIAPAN ~
~
dan-Lalu Lintas
~
~
Udara/Bising
-Pekerja Penggalian tanah -Transportasi
-kerusakan jalan yamg dilewt dilewati
-Volume kerusakan. jala jalan
-Pengaturan berat materiatikan memperhatikan kondisi jalan
-PDAM Kota Makassar
Sepanjang route anktn angkutan
-Tingkat Kemacetan /gangguan lalulintas
-Pengaturan angkutan menghindan jam -jam padat Mengunakan
-PDAM Kota Makassar
Lks ag Lokasiryang padat pdtpnaaa
Sementara
mutu Udara Nasional
peralatan mengeluarkan bising!gas buang dan sesuai baku mutu Nasional
-PDAM Kota Makassar
Pada lokasi tertentu yang padat lalulintas
Waktu kegiatan Wan pengamanan pnaaa
Sementara
Keclakan pekeija
Membangun dinding penahan
Lokasi/Rute penggasian
Wkukgaa WaktuPRgSKta Wan
Lokasi/Rute penggaian
Waktu kegiatan dengan pengawasan
Tetap
-Kemacetan lalulintas
PncmaanBaku Pencemaran udara/bising
L -Longsor
-Gengaimtni angguanhs | lauingua Sementara lalulintas
Environmental Impact Assessment for PDAM
_Tingkat kemacetan
~~~lalulintas
-PDAM Kota Makasar
-Pengaturan
-PDAM Kota
dengan menghindani penggalian pada
Makassar
dengan cara selalu mengawasi kegiatan sesuai
KIMPRASKO
ketentuan Wkuagua Waktu angkutan dengan an
BAPEDALKO
KIMPRASKO
DITLANTAS
54
-Transportasi
-Ganngguan { lalulintas
Sementara
-Tingkat kemacetan lalulintas
-Mengatur gahan /timbuman bahan* ,tidak mengurangi jalan ruas yang
-PDAM Kota Maar Makassa
Sepanjang epaipan pipa transmissi
Waktu kegiatan dWngan dengan pengamanan
DkTiNTAn DITLANTAS
ada
-Pekerja B. PEKERJAAN
-Longsor
Sementara
Kecelakaan pekerja
Pemasangan pipa transmisi air Bersih -Udara
Air
-Pencemaran ud a r a
Erosi
Environmental Impact Assessment for PDAM
Sementara a
-Baku mutu u u- a r
Estetika |gangguan aSementaa lalulintas
-PDAM Kota
Sepanjang
Waktu kegiatan
Membangun dinding penahan
Makassar
lubang pipa transnmissi
dengan pengawasan
KIMPRASKO
-Mekanisme
-PDAM Kota
Sepanjang
Makassar
jalur pipa transmsi dan masyarakat sekitar
-waktu kegiatan dengan pengamanan
BAPEDALKO
teknis pengerjaan aantara lain penyiraman air -Menutup tanah galian dan membuat pait air
-PDAM Kota Makassar
Jalur p ipa transPAssi
Waktu kegiatan dengat enga sn
KeMPRASKO
55
4.6.2. Matrik EMP IPA Baru Panaikang(2 x 250 Lps) -UWSIEP PDAM Kota. Makassar
JO
I
TAHAP
KEGIATAN BERPOTENSI MENIMBULKAN DAMPAK /SUMBER DAMPAK (Activity Cause Environ. Impact
KOMPONEN LINGKUNGAN YANG TERKENA DAMPAK
DAMPAK YANG AKAN TERJADI (Environmental Impact)
JENIS DAMPAK
SIFAT DAMPAK
TOLA K UKUR
UPAYA PENGELOLAAN LINGKUNGAN (Environmental Management Plan)
UPAYA
LEMBAGDA
UPAYA PEMANTAUAN LINGKUNGAN (Environmental Monitoring Plan)
LOKASI
C AN CARA
LEMBAGA
KONSTRUKSI -Prasarana /Jalan
-Kerusakan jalan yang
dilalui
Tetap
dilalui
_______________ ____________
-Kemacetan Mobilisasi alat
-Lalu Lintas
lal-mintas pada
Mobiisasi
dan material
Sementara
rute perjalanan
Pengaturan berat material memperhatika n
-PDAM Kota Makassar MakRoute
Sepanjang
-Tingkat
-pengaturan
-PDAM Kota
Lokasi jalan
kemacetan
angkutan
Makassar
yang
lalu lintas'
- jam padat
-Volume kerusakan
jalan jalan
~~~memperhatikan kondisi jalan
angkutan agua
Selama kegiatan dengan cara selalu mengawasi
KIMPRASKO
kegenatan eitnssa ssa
~keten tuan
______________ ______________
~~~~~~~~~~ ~~~~~~/gangguan menghindari jam
-Waktu angkutan dengan
diperkirakan
dna
padat
pengamanan
DITLANTAS
Mengunakan
Peneemaran Udara/Bising
A. PERSIAPAN
-Udara
-Kebisingan
Pencemaran udara/bising
-Pencemaran udara
-Polusi suara
Sementara
Sementara
Sementara
~~~~Baku mutu Udara Nasional
-Baku mutu u
-Baku mutu udara
Penggalian pondasi
peralatan
-PDAM Kota
Pada lokasi
Waktu kegiatan
mengeluarkan bising/gas buang dan sesuai baku mutu Nasional
Makassar
tertentu yang padat lalulintas
dengan pengamanan
-Mekanisme
-POAM Kota
LoaiPA
-atukgtn
ekanise antara lain penyiraman air -Penyesuaian dengan kegiatan masyarakat dan pemilihan alat
Makassar
dan setar proyek
deBAPEDALKO pengamanan
-PDAM Kota Makassar
Lokasi IPA dan masyarakat
Waktu pemakaian alat berat dengan cara mengukur
sekitar proyek
kebisingan
memenuhi baku mutu suara
-POAM Kota t-Pekerja
Air
-Longsor
Sementara
Erosi
Sementara
-Pekerja -Longsor
EnvironmentalImpact Assessment for PDAM
Sementara
|Kecelakaan
~pekerja
Estetika ,gangguan lalulintas
Membangum
Makassar
-Menutup tanah b . membuat pant air
-PDAM Kota Makassar
dinding penahan
BAPEDALKO
BAPEDALKO
Wkukgaa Lokasi
pondasi IPA
Lokasi Galian pondasi IPA
dean
KIkiRASaO
Waktu kegiatan dengan pengawasan
KIMPRASKO
dengawsn
MPAK
56
-Transportasi
-Ganngguan lalulintas
Sementara
-Tingkat |nengurangi kemacetan lalulintas
-Mengatur galian /timnbunan bahan Jtidak jalan ruas yang
_DMKt Mkassar
LDokaKotamLsa k Waktu kegiatan Pok IPA dengan Y pengamanan
D
Lokasi IPA dan masyarakcat sekitar
Waktu pemakaian alat berat dengan cara mengukur kebisingan
BAPEDALKO BAE LK
A
ada B. PEKERJAAN
Pekerjaanujala
P.kerjaan Kebisingan masuk,strukur
Polusi suara Keisingn Poluisuar
Sementara Semetara
(pagar ,saluran
PASCA K ONSTRUKSI (OPERASI)
Lumpur sedimentasi
-Air
Erosi
Tanah dan air tanah
-pencemaran penchedma r a tanah tanah
Environmental Impact Assessment for PDAM
Sementara
mentara
.alan -penyesuaian Baku mutu dengan kegiatan isingmasyarakat dan g pemilihan alat yg sesuai
-PDAM Kota Makassar
Estetika ganggua lalulintas
-Menutup tanah gahman dan
-PDAM Kota Makassar
Lokasi IPA
Waktu kegiatan dengan pengawasan
KIMPRASKO
Pengelolaan dan Pengotahan
-PDAM Kota Makassar
P
Sampling satu
BAPEDALKO
Baku mutu B3 Nasional
Lumpur
bagian tugas ~~~~~~~~~~Sementasi DED
k IPA
bulan sekali
57
Tabel 4.6.3. Matrik EMP Ekspansi sistem distribusi - UWSIEP PDAM Kota Makassar
iO
TAHAP
KEGIATAN BERPOTENSI MENIMBULKAN DAMPAK /SUMBER DAMPAK (Activity Cause Environ. Impact
KONSTRUKSI
KOMPONEN LINGKUNGAN YANG TERKENA DAMPAK
DAMPAK YANG AKAN TERJADI (Environmental Impact)
JENIS DAMPAK
SIFAT DAMPAK
UPAYA PENGELOLAAN LINGKUNGAN (Environmental Management Plan)
TOLAK UKUR
UPAYA
LEMBAGA
UPAYA PEMANTAUAN LINGKUNGAN (Environmental Monitoring Plan)
LOKASI
WAKTU DAN CARA
LEMBAGA
_
Mobilisasi alat
-Prasarana
-Kerusakan
/Jalan
jalan yang dilalui
-Lalu Lintas
dan material
Peg ua Tetap
-Kemacetan lalulintas pada
Sementara
rute perjalanan
eatSelama
kegiatan
-Volume kermsakan jalan
Pengaturan berat matenral memperhatikan kondisi jalan
-PDAM Kota Makassar.
Sepanjang Route angkutan
-Tingkat kemacetan
-pengaturan angkutan
-PDAM Kota Makassar.
Lokasi jalan yang
/gangguan
menghindari jam
lalu lintas'
- jam padat
dengan cara selalu mengawasi kegiatan sesuai
KIMPRASKO
ketentuan
Makassar.a
yangmana
-Waktu angkutan dengan
padat
pengamanan
Pada lokasi tertentu yang padat
Waktu kegiatan dengan pengamanan
lalulintas
pnaaa
DITLANTAS
Mengunakan Udara/Bising
Pencemaran udara/bising
Sementara
Baku mutu Udara Nasional
peralatan mengeluarkan bising/gas buang
- PDAM Kota Makassar.
dan sesuai baku
BAPEDALKO
mutu Nasional
A. PERSIAPAN
-Udara
-Mekanisme -Pencemaran udara
Sementara
-Baku mutu udara
teknis pengerjaan antara lain : penyiraman air
Lokasi Makassar.
jalur
pipa dan masyarakat sekitar proyek
dengan pengamanan
BAPEDALKO
-Penyesuaian
dengan kegia tan Penggalian galian -Kebisingan
-Polusi suara -Polusi suara
Sementara Sementara
-Baku mutu udara
masyarakat dan pemilihan alat memenuhi baku
Koa
Lokasi jalur
Waktu pemakaian
PDAM Kota
pipa dan masyarakat sekitar proyck
alat berat dengan cara mengukur kebisingan
PDAM Kota Makassar.
Lokasi penggacan
Waktu kegiatan dengan
jalur pipa
pengawasan
-PA
BAPEDALKO
mutu suara
-Pekerja |
-Longsor
EnvironmentalImpact Assessment for PDAM
2 Sementara
-Pekeaonor pekerja
Sementara Membangun Kecelakaan dinding penahan
KIMPRASKO
58
Sepanjang
-Mekanisme -Udara
-Udara-Pencemaran Pencdmaran udara
-Transportasi
anngguan lal ulintas
Sementara Sementara
-Baku mutu udara
Sementara
-Tingkat kemacetan lalulintas
Pekerjaan pemasangnnpipa
Kebisingan
Polusisuara
Kota Makassar.
-PDAM
- PDAM
Kota Makassar.
jalur pipa transmsi dan masyarakat sekitar
-waktu kegiatan dengan pengamanan
BAPEDALKO
Lokasi masuk Proyek Reservoir
Waktu kegiatan dengan pengamanan
DITLANTAS
~~~~~
_____________
B. PEKERJAAN
teknis pengerjaan antara lain penyirman ar -Mengatur galian /timbunan bahan tidak mengurangi jalan ruas yang
Sementara
Bkmuu B'sg Baktt
~~~~ada_ _
_
_
_
_
_
_
-penyesuaian dengan kegiatan -PDAM Kota masyarakat dan Makassar. Bising pmilihanalat ygmasyaraat
Lokasi IPA doan i waar
Waktu pemakaian aPAaktu peaaa caraberat denggan caramengukur
sesuai
sekitar
kebisingan
Jalur pipa transmissi
Waktu kegiatan dengan pengawasan
KIMPRASKO IPAK
PDAM Kota Makassar.
Lokasi jalur pipa psrpoelewat
Sebelum dan saat pelaksanaan
PEMDAKO
Kota Makassar. in-
Kran Sampling satu KoIumnKbEaSseaO bulan sekali
-Air
Erosi
Sementara
Estetika Igangguan laluLintas
-Menutup tanah galian dan membuat parit air
Melewati pasartradisonfl
kPeciagag - edaaniemlt
Sementara
-Pendapata -Penda gangt pedaugan
Soilsi da n pengaturan pekerjaan pada
Kota Makassar.
-PDAM
BAPEDALKO
jam-jam lenggang PASCA KONSTRUKSI (OPERASI)
Kontrol
Baku
Mutu Air Minum
Kosmn KosmnSmnaa
-keseha tan Konsumen
Environmental Impact Assessmentfor PDAM
Smnaa
Kepmemkes Baku mutu Air Mmimutu
Pengolahan air dnbankra da bahan kimma
-PDAM
DSEK
59
Tabel 4.7.1. Matrik EMP Upgrade pump at intake and booster pumps stations UWSIEP PDAM Kota Kendari KEGIATAN BERPOTENSI MENIMBULKAN DAMPAK /SUMBER DAMPAK (Activity Cause
TAHAP
Environ.
KOMPONEN LINGKUNGAN YANG TERKENA DAMPAK
Impact
DAMPAK YANG AKAN TERJADI (Environmental Impact)
JENIS
DAMPAK
SIFAT
DAMPAK
TOLAK
UKUR
UPAYA PENGELOLAAN LINGKUNGAN (Environmental Management Plan)
UPAYA
UPAYA PEMANTAUAN LINGKUNGAN (Environmental Monitoring Plan)
LEMBAGA
LOKASI
WAKTU DAN
LEMBAGA
CARA
KONSTRUKSI -selama kegiatan Prasarana
/jalan
-kerusakan jalan yamg
Tetap
dilewati
-Volume kerusakan
-Pengaturan berat memperhaksan
jalan
kempdrhaikaan
-Tingkat
-Pengaturan
-PDAM Kota
Lokasi yang
Waktu angkutan
Kemacetan /gangguan
angkutan menghindari jam
Kendari
diperkirakan padat
dengan pengamanan
lalulintas
-jam padat
padat
pengamanan
Pada lokasi
Waktu kegiatan
-PDAM Kota
. Sroute
dengan cara selalu
angkutan
mengawasi
_______________
Mobilisasi material
alat
dan
. -Lalu Litas
-Kemacetan lalulintas
Sementara
KIMPRASKO
~ketentuan DITLANTAS
Mengunakan
A. PERSIAPAN ~
~
~
~
Udara/Bising
PncmaanBaku Pencemaran
udara/bising
Sementara
mutu
Udara
Nasional
peralatan
mengeluarkan
bising/gas buang
-PDAM Kota Kendari
padat
dan sesuai baku mutu Nasional
-Pekeja Pemasangan pompa pipa
dan
pipa
tapak
-Pekerja
-Longsor
-ongso Semntara Sementara
Kecelakaan Membangun Keceakaan Membngun pekerja
sistem -Transportasi
_Gangguan Semetara G~~-Taspras alintgan eetr laluhintas -Transportasi
tertentu yang
-PDAM Kota Makasar
dinding penahan -Pengaturan
-PDAM Kota
_Tingkat eaea
dengan menghindari
Kendari
lalulintas
penggahian pada
dengan
BAPEDALKO
BAPEDAanKn
lalulintas
pengaranan
L Rt LokasiRute
Waktu kegiatan dengan
penggalian
pengawasan
Lokasi/Rute penaanan
Waktu dengan kegiatan
penggahan
pengawasan
KIMPRASKO
DITLANTAS
jam-jam padat
EnvironmentalImpact Assessment for PDAM
6
-Transportasi
-Ganrtgguan ~ Sementara lalulintas
-Tingkat kemacetan lalulintas
-Mengatur galian /timbunan bahan Jidak mengurangi jalan ruas yang
-PDAM Kota Kendari
Sepanjang Spnag pipa transmissi
Waktu kegiatan Wkukgaa dengan pengamanan
Sepanjang lubang pipa transmissi tasii Sepanjang jalur pipa transmsi dan masyarakat sekitar
Waktu kegiatan denganKI pengawasan pegwa
KIMRAS RA O
-waktu kegiatan dengan pengamanan
BAPEDALKO
DITLANTAS
ada
-Pekerja B. PEKERJAAN
Sementara
Kecelakaan pekeda
-Pencemaran udara
Sementara
-Baku mutu udara
Erosi
Sementara
-Longsor
Pemasangan pompa dan perpipaan -Udara
Air
Environmental Impact Assessment for PDAM
Estetika ,gangguan lalulintas
Membangun dinding penahan pekerJa dinding penahan -Mekanisme teknis pengerjaan antara lain penyiraman air -Menutup tanah gmenuldan t ai membuat pat air
-PDAM Kota Kendari
-PDAM Kota Kendari
-PDAM Kota Kendari
Jalpal transmissi
Waktu kegiatan dengan dengawn
KIMPRASKO
61
Tabel 4.7.3. Matrik EMP Ekspansi sistem distribusi - UWSIEP PDAM Kota Kendari
Jo
TAHAP
KEGIATAN BERPOTENSI MENIMBULKAN DAMPAK /SUMBER DAMPAK ( Activity Cause Environ. Impact
____________
KOMPONEN LINGKUNGAN YANG TERKENA DAMPAK
DAMPAK YANG AKAN TERJADI (Environmental Impact)
UPAYA PENGELOLAAN LINGKUNGAN (Environmental Management Plan)
UPAYA PEMANTAUAN LINGKUNGAN (Environmental Monitoring Plan) W
JENIS
SIFAT
DAMPAK
DAMPAK
TOLAK UKUR
UPAYA
LEMBAGA
LOKASI
CARA
LEMBAGA
KONSTRUKSI -Prasarana /Jalan
-Kerusakan jalan yang dilaltui
Tetap
-Kemacetan alat Mobilisasi
Mobilisasi dan material
-LalulLintas Lintas
-Kemacetan e-Lau rute perjalanan
Sementara
-Volume kerusakan jalan
~~~~-Tingkat kemacetan /gangguan lalu lintas'
b Pegmaterial materi a n kondisi jalan
-pengaturan angkutan menghindan jam - jam padat
Kendari.
Sepanjang Route angkutan
Selama kegiatan dengan cara selalu mengawasi kegiatan sesuai ketentuan
DMKb
Lokasi jalan
-atungun
PDAM Kota
yang diperkirakan padat
-Waktu angkutan denganan pengamanan
Pada lokasi tertentu yang padat lalulintas
Waktu kegiatan dengan pengamanan
BAPEDALKO
Lokasi jalur pipa dan
-waktu kegiatan
BAPEDALKO
meadsry masyarakat sekitar proyek
dengan pengamanan
- PDAM Kota
-
KIMPRASKO
DITLANTAS
Mengunakan
Udara/Bising
A. PERSIAPAN
Pencemaran udara/bising
Sementara
Baku mutu Udara Nasional
-Udara -Pencemaran udara
-Baku mutu Sementara
udara
peralatan mengeluarkan bising/gas buang dan sesuai baku mutu Nasional -Mekanisme teknis pengerjaan
- PDAM Kota
Kendari.
- PDAM Kota
antara lain : penyiraman air -Penyesuaian dengan kegiatan
Lokasi jalur
Waktu pemakaian
Sementara Sementara
-Baku mutu udara
masyarakat dan pemilihan alat memenuhi baku mutu suara
-PDAM Kota
-Kebisingan
-Polusi suara -Polusi suara
pipa dan masyarakat sekitar proyek
alat berat dengan cara mengukur kebisingan
-Pekerja _Pekeria
-Longsor -Longsor
Sementara Sementara
Kecelakaan pekerja pekerja
Membangun dinding penahan dinding penahan
- PDAM Kota Kendari.
Lokasi penggahan jalur pipa
Waktu kegiatan dengan pengawasan
Penggalian galian
Environmental Impact Assessment for PDAM
BAPEDALKO
KIMPRASKO
62
0-Udara
-Udara-Pencemaran i -Pencemaran uaaudara
-Transportasi
lalulintas
Sementara Sementara
-Baku muitu udakurautu
Sementara
-Tingkat kemacetan lalulintas
__ _ _ __ _
B. PEKERJAAN
PASCA KONSTRUKSI (OPERASI)
Pekerjaan pemasangan pipa
Baku Kontrol Mutu Air Minum ImpacAir
__ __ _
_ __ __
-Mekan.isme teknis pengerjaan antara lain penyiraman air -Mengatur galian /timbunan bahan ,tidak mengurangi jalan ruas yang -penyesuaian engan kegiatan masyarakat dan ~pemilihan alat yg sesuai
Kebisingan
Polusi suara
Sementara
-Air
Erosi
Sementara
Estetika ,gangguan lalulintas
Melewati pasar tradisionil)
kecildgag kecl
Sementara
-Sosialisasi dan -Pendapat an pengaturan pedagang dlpekerjaanngad menurun jam-jam lenggang
-kesehatan Konsumen
Sementara
Environmental Impact Assessment for PDAM
Kepmemkes Baku mutu Momum
Kota Kendari.
- PDAM
Sepanjang jalur pipa transmsi dan masyarakat sekitar
-waktu kegiatan dengan pengamanan
BAPEDALKO
Lokasi masuk Proyek Reservoir
Waktu kegiatan dengan pengamanan
DITLANTAS
ad a_
Baku mutu Bising Bising
Konsumen
Kota Kendari.
-PDAM
-Menutup tanah gamian dan membuat pant air
Pengolahan air dan bahan ia
_
- PDAM Kota
Kendari.
Kota Kendari.
Lks P Lokasi IPA masyarakat sktrkbsna sktrkbsna
- PDAM
Jalur pipa transmissi
_
_
_
_
_
eaaa at alat berat dengan cara mengkur
KIMPRASKO
PEMDAKO
Lokasi jalur pipa lewat pasar psrpoe
Sebelum dan saat pelaksanaan proyek
Kota Kendai.
Kran Konsumen
Sampling satu bulan sekali
- PDAM
BAPEDALKO
Waktu kegiatan dengan pengawasan
Kota Kendari.
- PDAM
_
DISKESKO
63
Tabel 4.8.1. Matrik EMP Pembangunan Intake baru Sijinjang S. Batanghari UWSIEP PDAM Kota Jambi KEGIATAN BERPOTENSI TAHAP TAHAP
MENIMBULKAN DAMPAK /SUMBER DAMPAK (Activity Cause
KOMPONEN
DAMPAK YANG AKAN TERJADI
UPAYA PENGELOLAAN LINGKUNGAN
UPAYA PEMANTAUAN LINGKUNGAN
LINGKUNGAN
(Environmental Impact)
(Environmental Management Plan)
(Environmental Monitoring Plan)
YANG TERKENA DAMPAK
DAMPA
DAMPA
K
UPAYA
LEMBAGA
LOKASI
CARA
LEMBAGA
Environ. Impact KONSTRUKSI -selama kegiatan Prasarana /Jalan /jalan
Mobilisasi
alat
dan
mobiisateriaalatda material
-Lalu Lintas
-kerusakan jalan alnyamg dilewati
-Kemacetan
eal etan lalulintas
Tetap
Sementara
-Volume -Volume kerusakan jalan
Pencemaran udara/bising
Sementara
Baku mutu Udara Nasional
-Pekerja
-Longsor
Sementara
Kecelakaan pada pekerija
Penggalian pondasi -Transportasi
-Transportasi lalulguas
.
Environmental Impact Assessment for PDAM
Se _Gangguan a Sementara
_Tingkat kemacetan lalulintas
angkutanmegws
dengan cara selalu mnaai
Dinas PU Kota Da UKt
-PDAM Kota
Lokasi yang
Jambi
diperkirakan padat
dengan pengamanan
DLLAJ
peralatan mengeluarkan bising/gas buang dan sesuai baku mutu Nasional
-PDAM Kota Jambi
Pada lokasi tertentu yang padat lalulintas
Waktu kegiatan dengan pengamanan pnaaa
BAPEDALKO
Lokasi intake
Waktu kegiatan dengan pengawasan
Dinas PU Kota
Waktu kegiatan dengan pengawasan
DLLAJ
-Pengaturan angkutan..
Udara/Bising
Sepanjang Se
angkan menghindari jam -jam padat Mengunakan
Kemacetan
Kganetan /gangguan
-PDAM Kota Jambi
kegiatan sesuai ketentuan Waktu angkutan
-Tingkat
lalulintas
A. PERSIAPAN
-Pengaturan berat material dengan m pehtknroute memperhatikan kondisi jalan
Membangun dindmig penahan
-PDAM Kota Jambi
-Pengaturan
-PDAM Kota
dengan menghindari penggalian pada
Jambi
Lokasi/Rute penggLoasi/at
~~~~~~~~~~~~~~~~~~~~~~~~~jam-jam padat
-Transportasi
lalulintas
Sementara
-timbunan bahan ,tidak mengurangi jalan ruas yang
-Tingkat kemacetan lalulintas
-Pekerja B. PEKERJAAN
-Longsor
Sementara
Lokasi Intake
~ad a_
__ __ _ _ _ _
Mebangun Kecelaaan dinding penahan Kecelakaan
_
-PDAM Kota Jambi
_
_
_
_
Lokasi Intake
DLLAJ _
__
Waktu kegiatan dengan
_
_
_
_
Dinas PU Kota
pengawasan
I
Pembangunan Intake
Waktu kegiatan dengan pengamanan
-PDAM Kob
-Mekanisme -Udara
-Pencemaran udara
Sementara .___________
-Air
Erosi
Environmental Impact Assessment for PDAM
Sementara
____________
teknis antara lain: penyiram an air
a Pencemara Penair
-Menutup tumpukan tanah
sungai
galian
Baku mutu
Jambi
Lokasi Intake
-PDAM Kota Jambi
Lokasi Intake
dengan pengamanan
Waktu kegiatan dengan
BAPEDALKO
Dinas PU Kota
pengawasan
65
_
Tabel 4.8.3. Matrik EMP Ekspansi sistem distribusi - UWSIEP PDAM Kota Jambi KEGIATAN BERPOTENSI
MENIMBULKAN JO
DAMPAK /SUMBER DAMPAK ( Activity Cause
TAHAP
KOMPONEN
DAMPAK YANG AKAN TERJADI
UPAYA PENGELOLAAN LINGKUNGAN
UPAYA PEMANTAUAN LINGKUNGAN
LINGKUNGAN
(Environmental Impact)
(Environmental Management Plan)
(Environmental Monitoring Plan)
YANG TERKENA DAMPAK
_______
Environ. Impact I
JENIS
SIFAT
DAMPAK
DAMPAK
TOLAK UKUR
UPAYA
LEMBAGA
LOKASI
WAKTU DAN
LEMBAGA
CARA
KONSTRUKSI
-Kerusakan jalan yang dilaluli
-Prasarana IJalan
Mobilisasi alat dan material
-Volume kerusakan jalan
angatran matperhal .an kmopdiialan
-Tingkat kemutu U /gangguan Nlalu lintas'
-pengaturan angkm menghindari jam -jlam padat Mengunakan
PeA.emaran drPencemaran Sementara udarabisinaNasional
Baku mutu Udara
peralatan mengeluarkan bising/gas buang dan sesuai baku mutu Nasional
-Pencemaran
Sementara
pekeumntu
-Mekanisme teknisbi. g
udara
Seventaantara
Tetap
-Kemacetan lalulintas pada Sementara rute perjalanan
-Lalu Lintas
udara/bisig
Udara/Bising
A. PERSIAPAN
-Udara
- PDAM Kota
Jambi.
Sepanjang Route angkutan
PDAM Kota Jambi.
Lokasi jalan yang lWaktu angdengan diperkirakan
Selama kegiatan dengan cara selalu mengawasi kegiatansesuai angiatan
DA
padat
dengamnanLA pengamanan
PDAM Kota Jambi.
Pada lokasi pa dan p.tere e lalulintas
Waktu kegiatan dengan pengamanan kengan
PDAM Kota JambiM Ka
Lokasi jalur penggahan
Waktu kegiatan dengan
masyarakat sekitar proyek
dengamn pnaaa
Lokasi jaIur pipa dan masyarakat sekitar proyek
Waktu pemakaian alat berat dengan cara mengukur kebisingan
Lokasi penggalian jalur pipa
Waktu kegiatan dengan pengawasan
lain : penyiraman air
DINAS P KOTA
BAPEDALKO
BAPEDALKO
-Penyesuaian Penggalian pipa
jalur -Keisigan -Pousisuaa Pls saa
Smenara Smnaa
-Baudara u udbsna ut -ara
-Pekerja -Longsor -Pekera -Lonsor
Sementara Seentara
Kecelakaan pekerja
Environmental Impact Assessment for PDAM
dengan kegia tan emihanyaraatda pmihasyaraatda memenuhi baku mutu suara
Membangun dinding penahan
-PDAM
Kota
Jambi.
-PDAM
Jambi.
Kota
BAPEDALKO
DINAS PU KOTA
66
-Udara
-Transportasi
-Pencemaran uaaudara
Sementara
lanngguan
Sementara
-Baku mutu -ungar
-Tingkat kemacetan lalulintas
-Mekanisme teknis a nlaa antara lain penyiraman air -Mengatur galian /timbunan bahan ,tidak mengurangi jalan ruas yang ada
B. PEKERJAAN
PASCA __OINSTARUKSI (OPERASI)
Pekerjaan pemasangan pipa
.penyesuaian dengan kegiatan masyarakat dan pemilihan alat yg sesuai
- PDAM Kota
Jambi.
- PDAM
Kota
Jambi. _
_
_
_
_
_
PDAM Kota Jambi.
Sepanjang jalur pipa transmsi dan masyarak~at sekitar
-waktu kegiatan dengan penganianan
Lokasi masuk Proyek Reservoir
Waktu kegiatan dengan pengamanan
Lks Lokasi IPA msyaralt msaaa sekitar
Waktu pemakaian cara mengkur aamnuu kebisingan
Jalur pipa transmissi
Waktu kegiatan Wenaktnegaa pengawasan
BAPEDALKO
DLLAJ
_
Kebisingan
Polusi suara
Sementara
Baku mutu Bu Bising
- Air
Erosi
Sementara
Estetika ,gangguan lalulintas
-Menutup tanah galian dan membuat parit air
PDAM Kota PambKot J
Melewati pasar tradisionil)
Smnaa Sementara
-Pendapat an pdgng menurun men_run
pengaturasi-
kPedagan kecilagng
PDAM Kota Jambi.
Lokasi jalur pipa lewat pasar
Sebelum dan saat pelaksanaan proyek
PEMDAKO
Sementara
Kepmemkes Baku mt Air Mnimum
Peglaa ar dan bahan kiia
PDAM Kota
Konsumen
Kran Konsumen
Sampling satu bulan sekali
DSEK D
Konnrumenku-kesehatan Konsumen Mutu Air Minum
Environmental Impact Assessment for PDAM
pengaturan pekerjaan pada jam-jam lenggang
Jbi
BAPEDALKO
DINAS PU KOTA
67
Tabel 4.8.4. Matrik EMP upgrade works at intakes Pulau Pandan S. Batanghari UWSIEP PDAM Kota Jambi KEGIATAN BERPOTENSI MENIMBULKAN DAMPAK /SUMBER DAMPAK (Activity Cause Environ. Impact
TAHAP
KOMPONEN LINGKUNGAN YANG TERKENA DAMPAK
DAMPAK YANG AKAN TERJADI (Environmental Impact)
TOLAKU
DAMPAT
UPAYA PEMANTAUAN LINGKUNGAN (Environmental Monitoring Plan)
UPAYA PENGELOLAAN LINGKUNGAN (Environmental Management Plan)
LEMBAGA
UPAYA
LOKASIA
CARA
LEMBAGA
KONSTRUKSI -selama kegiatan Prasarana /Jalan
-Lalu Lintas
material
-kerusakan yamg dilewati
lalulintan
Tetap
Sementara
-Pengaturan berat material dengan memperhatikan kondisi jalan
-PDAM Kota Jambi
Sepanjang route ankuta
-Tingkat
-Pengaturan
-PDAM Kota
Lokasi yang
Waktu angkutan
Kemacetan
jam angkutan -jam padat Mengunakan
Jambi
diperkirakan
dengan
peralatan mengeluarkan bising/gas buang dan sesuai baku mutu Nasional
-PDAM Kota Jambi
Pada lokasi tertenui yang padat lalulintas
Waktu kegiatan dengan pengamanan pnaaa
BAPEDALKO
Lokasi/Rute penggalian
Waktu kegiatan dengan pnaaa
DINAS PU KOTA
lalulintas
Udara/Bising
P Pengr udara/bisitng
Sementara
Baku mutu Udara Nasional
-Pekerja
-Longsor
Sementara
Kecelakaan Keeaan Memb~angun dinding penahan pekerja
-Transportasi
-Gangguan
A. PERSIAPAN
Pemasangan
dengan cara selalu mengawasi kegiatan sesuai ketentuan
-Volume kerusakan jalan
~~~~-PDAM
Kota
Makasar
DINAS PU KOTA
DLLAJ
sheet
Pile darat &sungai
laluLintas
eetaa
Sementara
Tingkat
-Pengaturan
gangguan
denganJabLosiWkuegtn
lalulintas . meningkat Eneironmenat
Environmental Impact Assessment for PDAM
-PDAMLokasi
pemancangan pada jam tidak
Isibuk
Jambi
Waktukegiatan pemancangan /route jalan
Assessment
dengan pengawasan
DLLAJ
for_PDAM_68
68
B. PEKERJAAN
Pemasangan pile
- Mengatur pelaksanaan pemancangan
-PDAM Kota Jambi
Waktu kegiatan dengan pengamanan
-Transportasi
a sanngguan lalulntas sungai
Sementara
-Pekerja
-Longsor
Sementara
-a Kecelakaan pekerja
-PDAM Kota Membangun Jambi dinding penahan dundung pekeria penahan
-Udaralbising
-Pencemaran udara
Sementara
-Baku mutu udara
-Menggunakan peralatan sesuai standart
-PDAM Kota Jambi
Lokasi Intake
-waktu kegiatan dengan pengamanan
-Air
Erosi
Sementara
Pencemara n air sungai
-Menutup tumpukan tanah galian
-PDAM Kota Jambi
Lokasi Intake
Waktu kegiatan dengan pengawasan
-gangguan laluhintas
Lokasi Intake
Lokasi Intake
Waktu kegiatan dengan
~~~pengawasan
DLLAJ
DINAS PU KOTP
sheet
EnvironmentalImpact Assessment for PDAM
BAPEDALKO
DINAS PU KOTP
69
4.8.5. Matrik EMP
4O
I
TAIIAP
KEGIATAN BERPOTENSI MENIMBULKAN DAMPAK /SUMBER DAMPAK (Activity Cause Environ. Impact
KOMPONEN LINGKUNGAN YANG TERKENA DAMPAK
Rehabilitate and upgrade Existing WTP Benteng-UWSIEP PDAM Kota. Jambi DAMPAK YANG AKAN TERJADI (Environmental Impact)
DAMPAK
SIFAT
TOLAK UKUR
UPAYA PENGELOLAAN LINGKUNGAN (Environmental Management Plan)
UPAYA
LEMBAGA
UPAYA PEMANTAUAN LINGKUNGAN (Environmental Monitoring Plan)
LOKASl
LEMBAGA
Selama kegiatan
KONSTRUKSI -Prasarana /Jalan
-Kerusakan jalan yang
Tetap
dilaiLu
-Volume kerusakan
jalan
Penigatturanberat
material memperhatikan lgRoute
-PDAM KotaSeaakgtn
Jambi
koemperhatian
Sepanjang
dengan cara selalu mengawasi
angkutan
kegiatan sesuai
.kondisi jalan
A. PERSIAPAN
CARA
Mobilisasi alat -Lalu Lintas dnmtraruepalan/gangguan dan material
-Kemacetan lalulintas pada Sementara rute pejalanan
-Tingkat keacgtandengan lalu lintas'
-pengaturan
DINAS PU KOTA
ketentuan -PDAM Kota
menghindari jam - jam padat
Lokasi jalan
-Waktu angkutan
diperkirakan padat
dengamnanLA pengamanan
Pada lokasi tertentu yang
Waktu kegiatan dega
padat lalulintas
pengamn pnaaa
DLLAJ
Mengunakan
Udara/Bising
cudara/bnsg
Sementara
udaraonmentglNasioial
Environmental Impact Assessment for PDAM
Baku mutu Udara
peralatan mengeluarkan
bising/gas buang dan sesuai baku mutu Nasional
-PDAM Kota Jambi
BAPEDALKO
70
-Transportasi
-Ganngguan Sementara lalulintas lalulintas
-Tingkat -Tingkat kemacetan
~~~lalulintas
-Mengatur galian /timbunan bahan tidak menga angi jalan ruas yang penyesuaian
B. PEKERJAAN
Retupgrade
Kebisingan upgrade
-Udara
PASCA KONSTRUKSI (OPERASI)
Lmpur sedimentasi
Tanahir t tanah
Polusi suara
Sementara
Baku mutu
-penyesuaian ~ ~ -PDAM Kota
enamna Waktu pemakaian
dan masyarakat sekitar
alat berat dengan cara mengukur kebisingan
BAPEDALKO
-PDAM Kota Jambi
Lokasi IPA
dengan pnaaa
Bapedalko
-DMKt Jambi
Proyek IPA
Sampling satu
BAPEDALKO
pecmrnPengelolaan Sementara anahpencemaran
Baku mutu
Pengolahan
Environmental Impact Assessment for PDAM
~
Lokasi IPA
DLLAJ
- Menggunakan peralatan sesuai standart
B3 Nasional
~
Waktu kegiatan Wkukgaa dengan
Jambi
Baku mutu udara
tanah
Lokasi mastk Proye A ProyekanaA
masyarakat dan yg
~~~~~~~~~~Bising pe-lhnalat pemsuhan
Sementara
Polusi udara
-PDAM Kota Jambi
Sementasi
dan
Waktu kegiatan
bulan seka
71
Tabel 4.8.5 a. Matrik EMP Rehabilitasi sistem distribusi & transmissi ke Jelutung UWSIEP PDAM Kota Jambi KEGIATAN BERPOTENSI MENIMBULKAN
YANG
DAMPAK /SUMBER
iO
I
TAHAP
UPAYA PEMANTAUAN LINGKUNGAN (Environmental Monitoring Plan)
UPAYA PENGELOLAAN LINGKUNGAN (Environmental Management Plan)
DAMPAK YANG AKAN TERJADI (Environmental Impact)
KOMPONEN LINGKUNGAN
DAMPAK (Activity Cause Environ. Impact
TERKENA DAMPAK
JENIS DAMPAK
SIFAT DAMPAK
TOLAK UKUR
UPAYA
LEMBAGA
LOKASI
WAKTU DAN CARA
LEMBAGA
KONSTRUKSI -Kerusa kan jalan yang
-Prasarana /Jalan
dilalhii
Mobilisasi alat dan material
-Kemacetan lalulintas pada
-Lalu Lintas
dan material
rute perjalanan
Tetap
Sementara
rute perjalanan
-Volume
Pengaturn bert
keruisakan jalan
matperial ikn kondieihalian kondisi
-Tingkat /gacetan /gangguan lalu lintas'
-pengaturan angkutan menghindani jam - jam padat
PDAM Kota
ambi.
Sepanjang
Selama kegiatan dengan cara
Route angkutan
selalu mengawasi kegiatan sesuai
jalan
DfNAS P
KOTA
~~~~~~~ketentuan
_______
- PDAM Kota
Jambi.
Lokasi jalan yang diperkirakan padat
-Waktu angkutan dengan dengamnanLA pengamanan
Pada lokasi
Waktu kegiatan
tertentu yang padat
dengan pengamanan
lalulintas
pna~a
DLLAJ
Mengunakan Udara/Bising
Pencemaran udara/bising
Sementara
Baku mutu
peralatan
Ba Nasional
mengeluarkan bising/gas buang
-PDAM
Kota
Jambi.
dan sesuai baku
BAPEDALKO
mutu Nasional -Udara
A. PERSIAPAN
-Pencemaran udara
-Baku mutu Sementara
udara
-Mekanisme
PDAMKota
Lokasi
jalur
tekrnis penDge
Kota
Lokai
janu
antara lain
Jambi.
wkukgaa
sekitar proyek
pengamanan
Lokasi jalur
Waktu pemakaian
pipa dan
alat berat dengan
pemilihan alat dan
masyarakat
cara mengukur
memenuhi baku mutu suara
seki tar proyek
kebisingan
Lokasi
Waktu kegiatan
penyiraman air
BAPEDALKO
masyarakat aengan
-Penyesuaian Penggalian pipa
dengan kegiatan
jalur -Kebisingan
Pekerja
Kebsinan Poluisura
emenara
-Baudara
-Polusi suara
Sementara
udara
-Longsor
Sementara
Kecelakaan
EnvironmentngsoraSementaralpekerja
Environmental Impact Assessment for PDAM
u
pmihasyalaatda
Membangun
dinding penahan
- PDAM Kota
Jambi.
PDAM Kota
Jambi.
penggalian jalur pipa
BAPEDALKO
DINAS P
dengan pengawasan
KOTA
72
-Udara
-Transportasi
B. PEKERJAAN
PASCA KONSTRUKSI (OPERASI)
Pekerjaan pemasangan pipa
Baku Kontrol Mut Air M um
Kebisingan
-Baku mutu -Ba
-Pencemaran udara
Sementara
lanngguan
Sementara
-Tingkat kemacetan lalulintas
Sementara
Baku mutu Bmasyarakat Bising
Polusi suara
Sepanjang jalur pipa transmsi dan masyarakat sekitar
-waktu kegiatan dengan pengamanan
Lokasi masuk Proyek Reservoir
Waktu kegiatan dengan pengamanan
Lokasi IPA dan masyarakat sekitca
Waktu pemakaian alat berat dengan cara mengukur mengan
sesuai
sekitar
kebisingan
Jalur p.ipa transmissi
Waktu kegiatan denantegaa pengawasan
Lokasi jalur pipa lewat pasar
Sebelum dan saat pelaksanaan proyek
PEMDAKO
Kran Konsumen
Sampling satu bulan sekali
DSEK D
-Mekanisme teknis pengerjaan antara lain penyiraman air -Mengatur galian /timbunan bahan ,tidak mengurangi jalan ruas yang ada -penyesuaian dengan kegiatan dan pemilihan alat yg
- PDAM
Kota
Jambi.
- PDAM
Kota
Jambi.
- PDAM
Kota
Jambi.
- Air
Erosi
Sementara
Estetika ,gangguan lAintas
PDAM Kota -Menutup tanah Jambi. Koa galian dan membuat air parit
Melewati pasar tradisioail)
-Pedagang kecil
Sementara
-Pendapat an peda gang menurun
-Sosialisasi dan pengaturan pekerjaan pada jam-jam lenggang
Konsumen
-kesehatan Konsumen
Sementara
Kepmemkes Baku mutu Air Mnimum
Pengolahan air dan bahan ki
Environmental Imnpact Assessment for PDAM
- PDAM
Kota
Jambi.
-PDAM
Jambi.
Kota
BAPEDALKO
DLLAJ
BAPEDALKO
DINAS PU KOTA
73
4.8.6. Matrik EMP
4O
TAIIAP
KEGIATAN BERPOTENSI MENIMBULKAN DAMPAK /SUMBER DAMPAK
(Activity Cause Environ. ImpactDAPK I
KONSTRUKSI
KOMPONEN LINGKUNGAN YANG TERKENA DAMPAK
DAMPAK YANG AKAN TERJADI (Environmental Impact)
DAMPAK
SIFAT AMA
TOLAK UKUR
UPAYA PENGELOLAAN LINGKUNGAN (Environmental Management Plan)
UPAYA
LEMBAGA
UPAYA PEMANTAUAN LINGKUNGAN (Environmental Monitoring Plan)
LOKASI
CARA
LEMBAGA
P
-Prasarana /jalan
A. PERSIAPAN
Rehabilitate and upgrade Existing WTP Broni-UWSIEP PDAM Kota. Jambi
Mobilisasi alat -Lalu Lintas matrial PERSIAPAN dan dan A. material
-Kerusakan jalan yang dilalui
Tetap
-Kemacetan lalulintas pada Sementara rute rote pedalanan/gangguan perjalana
-Volume kerusakan jalan -Tingkat kemacetan lalu lintas'
_Penga turan berat material matperialti memperhai kan kondisi ialan
-PDAM Kota Jambi amniRoute
-pengaturan angkutan menghindari jam - jam padat d
-PDAM Kota Jambi
Sepanjang angkutan
Selama kegiatan dengan cara selalu mengawasi kegiatan sesuai
DINAS PU KOTA
ketentuan
.__________linja
Lokasi jalan yang diperkirakan padat
-Waktu angkutan dengan pengmana pengamanan
Pada lokasi tertentu yang padat lalulintas
Waktu kegiatan dengan pengamanan
DLLAJ
Mengunakan Udara/Bising
Pencemaran Pencemaran Sementara udara/bising
Environmental Impact Assessment for PDAM
~~~Baku mutu Udara Nasional
peralatan mengeluarkan bising/gas buang dan sesuai baku mutu Nasional
-PDAM Kota Jambi
BAPEDALKO
74
-Ganngguan laluhntas
Sementara Sementara
-Tingkat kemacetan lalulintas
Polusisuara Penggantian
Sementara
Bakuimu Bising
-Transportasi
and
Rehabilitasi B. PEKERJAAN
uPegranti
a
n Kebisingan
pompa)
- Udara
PASCA KONSTRUKSI
Tanah dan air Lumpur (OPERASI)sedimentasi tanah (OPERASI) sedimentasi tanab
Polusi udara
Sementara
pecmrnPengelolaan tanahdarn aBr Semaentara tanah tanah
EnvironmentalImpact Assessment for PDAM
Baku mutu udara
Bku mutu Nasional
~B3
-Mengatur galian ,tidak mengurangi jalan ruas yang
-PDAM Kob
-penyesuaian
-PDAM Kota
Jambi masyarakat dan pemiliban alat sesuai ygsekitar - Menggunakan
-PDAM Kota
peralatan sesuai standart
Jambi
Pengolahan Lumpur
dan
-DMKt JPDAm Koa
~~~~~~~~~Sementasi
Lokasi masuk Proyek IPA
Waktu kegiatan dengan pengamanan
Lokasi IPA
Waktu pemakaian
dan
alat berat dengan
~~~~~~~~~~masyarakat cara mengukur
DLLAJ
BAPEDALKO
kebisingan Waktu kegiatan Lokasi IPA
|
dengan pengawasan
Bapedalko
Sampling satu blnskt
BAPEDALKO
75
Tabel 4.8.6.a Matrik EMP dari KEGIATAN BERPOTENSI MENIMBULKAN DAMPAK /SUMBER
40
TAHAP
pembangunan reservoar sistem distribusi reservoar baru 1 x 750 m3, R- UWSIEP PDAM Kota Jambi DAMPAK YANG AKAN TERJADI (Environmental Impact)
KOMPONEN LINGKUNGAN YANG
DAMPAK
TERKENA
(Activity Cause
DAMPAK
JENTS DAMPAK
Environ. Impact I
SIFAT DAMPAK
UPAYA PEMANTAUAN LINGKUNGAN (Environmental Monitoring Plan)
UPAYA PENGELOLAAN LINGKUNGAN (Environmental Management Plan)
TOLAK UKUR
UPAYA
LEMBAGA
LOKASI
WAKTU DAN CARA
LEMBAGA
KONSTRUKSI
-Prasarana
-Kerusakan
_;Pralanrjana
-Kerukang dilalui
kegiatan
PegtrnbrtSelama Tetap
Mobilisasi alat
-Volume kerusakan
material memperhatikan
jalan
kondisi alan
-Tingkat kemacetan /gangguan lalu lintas'
-pengaturan angkutan menghindari jam - jam padat
-Baku mutu
-Mekanisme teknis pengerjaan
- PDAM Jambi
Sepanjang Route
dengan cara selalu mengawasi
angkutan
kegiatan sesuai
Lokasi jalan yang diperkirakan padat
-Waktu angkutan dengan
DINAS PU KOTA
dan materialkenta -Lalu Lintas
-Kemacetan -LauKLimal tas lalulintas pada rute perjalanan
Sementara Sementara
-Pencemaran
Smnaa
udara
Sementara
-Udara udara
A. PERSIAPAN
- PDAM Jambi
PDMJmi
antara lain : penyiraman air
Lokasi Reservoir dan
DLLAJ
pengamanan
wkuegan kegnaan
BAPEDALKO
masyarakat sekitar proyek
penganianan
Lokasi
Waktu pemakaian
Rservoir dan masyarakat sekitar proyek
alat berat dengan cara mengukur kebisingan
BAPEDALKO
Waktu kegiatan dengan
DINAS PU KOTA
-Penyesuaian
dengan kegia tan Penggalian galian
-Kebisingan -Polusi suara Penggahangan
-Pekera
|-Longsor
EnvirenmentalImpact
Sementara
-Baku mutu udara
Kecelakaan Sementara| pekerja
Membangun |dinding penahan
AsLessmensfor SPmentaraDAMdindngpenahanreseor
EnvironmentalImpact Assessment for PDAM
-PDAM
Jambi
masyarakat dan pemilihan alat memenuhi baku mutu suara
. PDAM Jambi
Lokasi ^ penggalian di
pengaia
76
-Transportasi
-Transportasi lGanngguan laluhintas _
_ _
_
_ _
_
_
-Tingkat kemacetan lalulintas
Sementara
_ _
~~~~~~~~~-Mengatur bahan /timbunan galian ,tidak mengurangi jalan ruas yang
~~ad a_
__ __ _ __ ___ _ _ _ _ _
- PDAM Jambi _
_
_
_
_
_
Lokasi masuk Proyek Reservoir
Waktu kegiatan dengan pengamanan
Pada lokasi tertentu yang padat lalulintas
Waktu kegiatan dengan pengamanan pnaaa
Lokasi reservoir
Wkukgaa Waktu kegiatan pengawasan
DINAS PU KOTA
Lokasi
Sampling satu
BAPEDALKO
Reservoir
bulan sekali
DLLAJ
_
Mengunakan B. PEKERJAAN
Pneaa Pencemaran udara/bising
Sementara
Baku mutu Udara Nasional
peralatan mengeluarkan bising/gas buang dan sesuai baku mutu Nasional
-PDAM Kota Jambi
- Air
Erosi
Sementara
Estetika igangguan aktivitas
-Menutup tanah galian dan membuat pat air
-PDAM Kota Jambi
Konsumen
-kesehatan
Sementara
Kepmemkes
Pengolahan air
- PDAM Jambi
dan bahan kimia
- ba
Konstruksi Bising /udara RePEKERJAANKostrukoir Reservoir
Baku
PASCA
Kontrol
K(OPERASI)
Mutu Air Minum
Konsumen
Environmental Impact Assessment for PDAM
A
ir
mum
BAPEDALKO
77
V.
EVALUATION AND RECOMMENDATION
The results from the evaluation of main activities of the project and from the matrix on EMP from each PDAM presented in Chapter IV, in accordance with Decrees of Ministry of Environment No. 17 /2001 and Ministry of Public Works No. 17/2003 regarding environmental management plan and environmental monitoring plan is summarized as seen in the following tables on evaluation and recommendation:
Table 5.1: Recommendation of EMP for PDAM Kota Bogor (UWSIEP) Project activity Source development Downstream use
Activity during construction (Duplicating raw transmission to Dekeng) Control of raw water quality Production processes (WTP) Activity during construction (Extend and rehabitate Dekeng WTP)
Sludge from treatment processes Service delivery to customers Activity during installation of distribution pipes and service connections Control of raw water quality
Main potential impacts and suggested mitigations
Quality of Cisadane river is relatively sufficient, need for reliable yield during drought, if additional raw water is needed in the future catchment protection will be reqired. Cisadane river is potentially developed for raw water source for Kab/kota Tangerang. Temporary disturbance (traffic, air and noise pollution, landslide, erison, aesthetic and social). Mitigation under the task of contractor, PDAM (under DED consultant supervision) and supervision by Environmental office and other related agencies PDAM Kota Bogor under supervision of City Health Dept. Temporary disturbance (traffic, air and noise pollution, landslide, erosion, aesthetic aand social). Mitigation under the task of PDAM, contractor under DED consultant supervision. Supervision by Environmental office and other related agencies Potential source of pollution (facilities for sludge treatment is needed and included in the DED) under supervision of Environmental office As above
PDAM Kota Bogor under supervision of City Health Dept.
Environmental Impact Assessment for PDAM
Tabel 5.2.: Rekomendasi Kajian Lingkunagan PDAM Kab. Lebak/ Kota Rangkasbitung (UWSIEP) Project activity
Main potential Impacts and suggested mitigations
Source development
Downstream use
Kuantitas air s. Ciujung cukup perlu keandalan air baku musim kering (termasuk tugas konsultan). DAS cukup terlindungi,tetapi jangka panjang diperlukanproteksi DAS
Activity during construction (Intake , transmissi pipe)
Gangguan temporel (traffic, polusi udara,bising ,lonsor ,erosi , estitika dan sosial ). Mitigasi tugas kontraktor, PDAM (dibawah supervisi konsultan DED ) dan pengawasan pelaksana BapedalKab dan instansi terkait lainnya. PDAM Kab. Lebak dibawah pengawasan Dinas Kesehatan Kab.
Kontrol Baku Mutu Air Baku Production processes (WTP) Activity during construction
(WTP Bojongleles) Sludge from treatment processes Perlindungan instrumen dan
Kestabilan proses water treatment Service delivery to customers Activity during installation of distribution pipes and service connections Kontrol baku Mutu Air Minum
Gangguan temporel (traffic, polusi udara,bising
,Ionsor ,erosi , estitika
dan sosial ). Mitigasi tugas PDAM,Kontraktor dibawah supervisi konsultan DED dan pengawasan BapedalKab dan instansi terkait Sumber potensial pencemaran diolah(Fasilitas Pengolahan Lumpur diperlukan dan termasuk dalam proyek DED) dan dibawah pengawasan BapedalKab Proteksi terhadap cuaca (panas dan hujan ) bahan atap transparan dan
dinding terbuka Gangguan temporel (traffic, polusi udara,bising ,Jonsor ,erosi , estitika dan sosial ). Mitigasi tugas PDAM ,Kontraktor dibawah supervisi konsultan DED dan pengawasan BapedalKab dan instansi terkait PDAM Kab. Lebak dibawah Pengawasan Dinas Kesehatan Kab.
Environmental Impact Assessment for PDAM
79
Tabel 5.3.: Rekomendasi Kajian Lingkunagan PDAM Kota Cirebon Project activity
Main potential impacts and suggested mitigations
Source development Downstream use
Kuantitas Mata air relatif cukup perlu analisa kuantitatif mata air pada akhir musim kemarau, perhitungan pemakaian air di hilir telah diperhitungkan kebutuhannya, perlindungan kontaminasi thd mata air Cikepel (tugas konsultan Teknik) .
Activity during construction (Brontcaptering , transmissi pipe)
Gangguan temporel (traffic, polusi udara,bising ,lonsor ,erosi , estitika dan sosial ). Mitigasi tugas kontraktor, PDAM (dibawah supervisi konsultan DED ) dan pengawasan pelaksana BapedalKo dan instansi terkait lainnya. PDAM Kota Cirebon dibawah pengawasan Dinas Kesehatan Kota
Kontrol Baku Mutu Air Baku
Production processes (WTP) Activity durng construction (Aeration and disinfection) Sludge from treatment processes
Gangguan temporel (polusi udara,bising). Mitigasi tugas PDAM ,Kontraktor dibawah supervisi konsultan DED dan pengawasan Bapedalko dan instansi terkait Sumber potensial pencemaran diolah(Fasilitas Pengolahan Lumpur
Perlindungan instrumen dan
diperlukan dan termasuk dalam proyek DED) dan dibawah pengawasan Bapedaldako Proteksi terhadap cuaca (panas dan hujan ) bahan atap transparan dan
Kestabilan proses water treatment
dinding terbuka
Service delivery to customers Activity during installation of
distribution pipes and service connections Kontrol baku Mutu Air Minum
Gangguan temporel (traffic, polusi udara,bising ,jonsor ,erosi , estitika dan sosial ). Mitigasi tugas PDAM,Kontraktor dibawah supervise konsultan DED dan Pengawasan Bapedalko dan instansi terkait PDAM Kota Cirebon dibawah Pengawasan Dinas Kesehatan kota
EnvironmentalImpact Assessment for PDAM
80
Rekomendasi Kajian ,ingkungan PDAM Kota Pontianak (UWSIEP) Main potential impacts and suggested mitigations Project activity Source development
TABLE 5..4.:
Downstream use
Activity during construction (Construct raw water Transmission)
Kontrol Baku Mutu Air Baku
Kuantitas air S.Landak cukup .Tdk diperlukan mitigasi ,meskipun demikian jangka panjang intrusi air laut mempergaruhi ketersediaan sumber air baku ,perlu proteksi DAS Gangguan temporel (traffic, polusi udara,bising ,lonsor ,erosi, estitika dan sosial ). Mitigasi tugas kontraktor, PDAM (dibawah supervisi konsultan DED ) dan pengawasan pelaksana Bapedaldako dan instansi terkait lainnya. PDAM Kota Pontianak dibawah pengawasan Dinas Kesehatan Kota
Production processes (WTP) Activity during construction Sludge from treatment Processes Perlindungan
instrumen dan Kestabilan
proses water treatment Service delivery to customers Activity during instalation of distribution pipes and service connections Kontrol baku Mutu Air Minum
Gangguan temporel (traffic, polusi udara,bising ,lonsor ,erosi, estitika dan sosial ) Mitigasi tugas kontraktor,PDAM dibawah supervisi konsultan DED dan pengawasan BapedalKo dan Instansi terkait Sumber potensial pencemaran diolah(Fasilitas Pengolahan Lumpur diperlukan dan termasuk dalam proyek DED) dan dibawah pengawasan Bapedaldako Proteksi terhadap cuaca (panas dan hujan ) bahan atap transparan
dan dinding terbuka Gangguan temporel (traffic, polusi udara,bising ,Ionsor ,erosi ). Mitigasi tugas kontraktor, PDAM (dibawah supervisi konsultan DED ) dan pengawasan pelaksana Bapedaldako dan instansi terkait lainnya.
estitika dan sosial
PDAM Pontianak dibawa Pengawasan Dinas Kesehatan kota
Environmental Impact Assessment for PDAM
81
Tabel 5.5.: Rekomendasi Ka-ian Lingkungan PDAM Kota Banjarinasin (UWSIEP) Project activity
Main potential impacts and suggested mitigations
Sumber Air dan transmissi Downstream use
Activity during construction Expansion Intake & pompa)
Kontrol Baku Mutu Air Baku Production processes (WTP) Activity during construction (WTP Pramuka)
Sludge from treatment processes
Perlindungan instrumen dan Kestabilan proses water treatment Service delivery to customers Activity during installation of distribution pipes and service connections Kontrol baku Mutu Air Minum
Kuantitas air S. Martapura cukup . Di hilir penggunaan air tidak signifikan ,Tdk diperlukan mitigasi ,meskipun demikian jangka panjang intrusi air laut mempergaruhi ketersediaan sumber air baku, jangka panjang perlu proteksi DAS Gangguan temporel (traffic, polusi udara,bising ,lonsor ,erosi, estitika dan sosial ). Mitigasi tugas kontraktor, PDAM (dibawah supervisi konsultan DED ) dan pengawasan pelaksana Bapedaldako dan instansi terkait lainnya. PDAM kota Banjarmasin dibawah pengawasan Dinas Kesehatan Kota Gangguan temporel (traffic, polusi udara,bising ,lonsor ,erosi, estitika dan sosial ). Mitigasi tugas kontraktor, PDAM (dibawah supervisi konsultan DED ) dan pengawasan pelaksana Bapedaldako dan instansi terkait lainnya. Sumber potensial pencemaran diolah(Fasilitas Pengolahan Lumpur diperlukan dan termasuk dalam proyek DED) dan dibawah pengawasan Bapedaldako Proteksi terhadap cuaca (panas dan hujan ) bahan atap transparan
dan dinding terbuka Gangguan temporel (traffic, polusi udara,bising ,lonsor ,erosi, estitika dan sosial ). Mitigasi tugas kontraktor, PDAM (dibawah supervisi konsultan DED ) dan pengawasan pelaksana Bapedaldako dan instansi terkait lainnya. PDAM Banjarmasin dibawa Pengawasan Dinas Kesehatan kota
EnvironmentalImpact Assessment for PDAM
82
Tabel 5.6: Rekomendasi EMP PDAM Kota Makassar (UWSIEP) Project activity Source development Downstream use
Activity during construction raw transmission from Somba Opu to Panaikang) Kontrol Baku Mutu Air Baku
Production processes (WTP) Activity during construction Construit New WTP Panaikang) Perlindungan instrumen dan Kestabilan proses water treatment Sludge from treatment processes
Main potential impacts and suggested mitigations Peruntukan air baku Waduk Bili-Bili 3000 Lps . yg terpakai baru 1000 Lps untuk IPA Sombu Opu, pada musim penghujan kekeruhan tinggi , untuk masa yg akan datang diperlukan proteksi DAS . Gangguan temporel (traffic, polusi udara,bising ,lonsor ,erosi, estitika dan sosial ). Mitigasi tugas PDAM (dibawah supervisi konsultan DED ) dan pengawasan pelaksana BapedalKo dan instansi terkait lainnya. PDAM Kota Makassar dibawah pengawasan Dinas Kesehatan Kota ( pengambilan sampling)
Gangguan temporel(traffic, polusi udara,bising ,lonsor ,erosi, estitika dan sosial ). Mitigasi tugas PDAM , dibawah supervisi konsultan DED dan Pengawasan Bapedalko dan instansi terkait Proteksi terhadap cuaca (panas dan hujan ) bahan atap transparan dan dinding terbuka Fasilitas Pengolahan Lumpur diperlukan dan termasuk dalam proyek DED) dan dibawah pengawasan BapedalKo dan harus dikelola dengan semestinya.
Service delivery to customers Activity during installation of distribution pipes and service connections Kontrol baku Mutu Air Minum
Gangguan temporel (traffic, polusi udara,bising ,lonsor ,erosi, estitika dan sosial gangguan aktivitas sehari- hari ). Mitigasi tugas PDAM , dibawah supervise konsultan DED dan Pengawasan Bapedalko dan instasi terkait. PDAM Kota Makassar dibawah Pengawasan Dinas Kesehatan Kota termasuk sampling ditempat.
Environmental Impact Assessment for PDAM
83
Tabel 5.7: Rekomendasi EMP PDAM Kota Kendari (UWSIEP) Project activity Source development Downstream use
Activity during construction Upgrade pumps at intake and Booster pump ) Kontrol Baku Mutu Air Baku Production processes (WTP) Activity during construction (Rehabilitate WTP)
Perlindungan instrumen dan Kestabilan proses water treatment Sludge from treatment processes
Service delivery to customers Activity during installation of
Main potential impacts and suggested mitigations Kapasitas debit air sungai Pohari cukup besar , perlu analisa ketersedian air baku musim, pada musim penghujan relatif sedikit kekeruhan meningkat, kemarau untuk masa yg akan datang diperlukan proteksi DAS . Gangguan temporel (traffic, polusi udara,bising, estitika dan aktivitas sehari-hari terganggu ). Mitigasi tugas PDAM (dibawah supervisi konsultan DED ) dan pengawasan pelaksana BapedalKo dan instansi terkait lainnya. Sampling DinkesKo Kendari sebulan sekali Gangguan temporel(traffic, polusi udara,bising ,lonsor ,erosi, estitika dan gangguan aktivitas sehari-hari ).
Mitigasi tugas PDAM , dibawah supervisi konsultan DED dan Pengawasan Bapedalko dan instansi terkait Proteksi terhadap cuaca (panas dan hujan ) bahan atap transparan dan dinding terbuka Fasilitas Pengolahan Lumpur diperlukan dan termasuk dalam proyek DED) dan harus dikelola dengan semestinya dibawah pengawasan BapedalKo
Gangguan temporel (traffic, polusi udara,bising ,Jonsor ,erosi
distribution pipes and service
estitika dan sosial gangguan aktivitas sehari- hari ).
connections
Mitigasi tugas PDAM, dibawah supervise konsultan DED dan Pengawasan Bapedalko dan instasi terkait. Sampling Dinas Kesehatan Kota sebulan sekali
Kontrol baku Mutu Air Minum
Environmental Impact Assessment for PDAM
84
Tabel 5.8: Rekomendasi EMP PDAM Kota Jambi (UWSIEP) Project activity Source development Downstream use
Activity during construction (New Intake Sijinjang and upgrade works at intake Pulau Pandan) Kontrol Baku Mutu Air Baku Production processes (WTP) Activity during construction ( New WTP Sijinjang & Rehabilitate WTP dan upgrade pompa) Perlindungan instrumen dan Kestabilan proses water treatment Sludge from treatment processes
Service delivery to customers Activity during installation of distribution pipes and service connections Kontrol baku Mutu Air Minum
Main potential impacts and suggested mitigations
Kapasitas debit air sungai Batanghari cukup besar , pada musim penghujan kekeruhan sedikit meningkat, untuk masa yg akan datang diperlukan proteksi DAS . Gangguan temporel (traffic, polusi udara,bising, estitika dan aktivitas sehari-hari terganggu ). Mitigasi tugas PDAM (dibawah supervisi konsultan DED ) dan pengawasan pelaksana BapedalKo dan instansi terkait lainnya. Sampling Bapedalko
sebulan sekali
Gangguan temporel(traffic, polusi udara,bising ,lonsor ,erosi , estitika dan gangguan aktivitas sehari-hari ). Mitigasi tugas PDAM , dibawah supervisi konsultan DED dan Pengawasan Bapedalko dan instansi terkait Proteksi terhadap cuaca (panas dan hujan ) bahan atap transparan dan dinding terbuka Fasilitas Pengolahan Lumpur diperlukan dan termasuk dalarn proyek DED) dan harus dikelola dengan semestinya dibawah pengawasan BapedalKo Gangguan temporel (traffic, polusi udara,bising ,Jonsor ,erosi , estitika dan sosial gangguan aktivitas sehari- hari ). Mitigasi tugas PDAM , dibawah supervise konsultan DED dan Pengawasan Bapedalko dan instasi terkait. Sampling Dinas Kesehatan Kota sebulan sekali
Environmental Impact Assessment for PDAM
85
Attachments: List of Attendance Lamp. 1.1: Daftar Hadir Konsultasi/Presentasi EMP PDAM Kabupaten Lebak No Nama Jabatan/Perwakilan 1 H.Odih Ch.P Wakil Bupati Lebak 2 H.Mulyadi J (*) Bupati Lebak 3 H.Muslich Ilyas Asda II 4 Hikmat Syadli BP-PDAM 5 Isman K PDAM 6 Alan S PDAM 7 Heri A PDAM 8 Itong A PDAM 9 Kadirudin PDAM 10 H.Ridwan PDAM 11 Lili S PDAM 12 R.Chandra Kabid Ek Bappeda 13 Yosep M.Holis Staff Bappeda 14 TB Lili S Pa Binmaret 15 MABasyid Asisten konsultan 16 DR. Arwin (+) Konsultan EMP 17 H. Wiryadinata ASDA I 18 Anik Anifah PDAM Lebak 19 Tatang S 20 Risyana Sukarma World Bank 21 Iman Solichin PDAM Note: Konsultasi di lingkungan PDAM Kab .Lebak dilakukan 23/1 -2004 (*)Pemrimpin Sidang: Bupati dan (+)Person presentasi Tim EMP
EnvironmentalImpact Assessment for PDAM
86
Lamp. No 1 2 3 4 5 6 7 8 9 Note:
1.2 :Daftar Hadir Konsultasi Tim EMP UWSIEP dengan PDAM Cirebon Jabatan/ Perwakilan Nama Kabag Perenc.Teknik Hender Yogiyana Kabag Keu Moh.Asikki Dir. Tek Sri Supanti Keuangan Agus Salim Staf PDAM Dadang Hadi WB Jakarta Risyana Konsultan EMP WB Arwin Ass Kons MA Basyid Dirut PDAM Kota Cirebon Santoso Konsultasi di lingkungan PDAM Kota Cirebon dilakukan 4/2 -2004
Environmental Impact Assessment for PDAM
87
Lampiran 1.3:Daftar Hadir Konsultasi Tim EMP UWSIEP dengan PDAM Pontianak No Nama Jabatan/ Perwakilan 1 Rakhmat Konsultan 2 Henky Konsultan 3 Lajito PDAM 4 Abdullah PDAM 5 Petrus K PDAM/ Dir Um 6 Arwin S Konsultan WB 7 Basyid Ass Konsultan Note: Konsultasi di lingkungan PDAM Potianak dilakukan 11/2 -2004
EnvironmentalImpact Assessment for PDAM
88
Lamp. 1.4: Daftar Hadir Konsultasi Tim EMP UWSIEP dengan PDAM Banjarmasin No 1 2 3 4 5 5
Nama Zainal Hesly Fadjar Muhidin Abdurrahman Muslih
Jabatan/ Perwakilan Dirut PDAM Kota Banjarmasin Kepala Bapedalda kota Banjarmasin Dirtek PDAM Ka Unit IPAL PDAM Dirum PDAM Banjarmasin Kabag Perencanaan Teknik
Staf UPT PAL(IPAL) Farida 6 Konsultan EMP World Bank Arwin 7 Asisten konsultan 8 Bayu Note: Konsultasi di lingkungan PDAM Banjarmasin dilakukan 2/3 -2004
Environmental Impact Assessment for PDAM
89
Lamp. 1.5: Daftar Hadir Konsultasi Tim EMP UWSIEP dengan PDAM Makassar No 1 2 3 4 5 6
Nama DR. Arwin Sabar Rachmansyah Taufiq Amri Justinus Semba Abdul Wahid M. Katia
Jabatan/ Perwakilan Konsultan EMP World Bank Ka. Bagian Rentek PDAM Bagian Keuangan PDAM Staf Bagian Rentek PDAM Staf Bagian Perlatek PDAM Ka. Bagian Produksi PDAM
7 Teddy Prasetiawan Asisten Konsultan Note: Konsultasi di lingkungan PDAM Makassar dilakukan 18 /3 -2004
EnvironmentalImpact Assessment for PDAM
90
Lamp. 1.6. Daftar hadir Konsultasi dengan PDAM Kota Kendari No Nama Keterangan 1 2 3 4
Edi Sudiro Andi Solihin Jasman L. Idrus
Dirut PDAM Dirtek Kabag Produksi Kabag Perencanaan Teknik
5 Sugito Kabag Perawatan 6 Ruslan H. Kabag Distribusi 7 Samsul Kasubag Pengawaian 8 Arwin Konsultan WB 9 Teddy Asisten Konsultan Konsultasikan, sabtu tgl 20 Maret 2004 di PDAM Kota Kendari
Environmental Impact Assessment for PDAM
91
Lamp. 1.7 Daftar hadir Konsultasi dengan PDAM Kota Jambi Keterangan No Nama 1 2 3 4
Ir. Agus Sunara Drs. Mahudi Ir. Firdaus Drs. Yulianto
5 Denny Hardi, BAc 6 Arief Sutanto, BBA 7 Sumidjan Sugianto 8 9 Asnawi 10 Arwin 11 Bayu Konsultasikan , jumat tgl 26 Maret 2004
Direktur Utama PDAM Jambi Dir. Adm & Keuangan Dir. Teknik Kabag Umum Kabag Keuangan Kabag Hubungan Pelanggan Kabag Transmisi & Distribusi Kabag Perencanaan Kepala Litbang-PDE Konsultan Bank Dunia Ass. Konsultan di PDAM Kota JAM3BI
Environmental Impact Assessment for PDAM
92