REKAPITULASI PENAWARAN HARGA SUPERVISI PT. Intimulya Multikencana PEKERJAAN LOKASI T.A.
: SUPERVISI PEMBANGUNAN FASILITAS PELABUHAN LAUT ORANSBARI : PELABUHAN ORANSBARI, PROPINSI PAPUA BARAT : APBN 2014
URAIAN KEGIATAN
NO.
I II
TOTAL HARGA (Rp)
PERESENTASE (%)
280,000,000.00 164,750,000.00 37,500,000.00 107,750,000.00 19,500,000.00
63%
REAL COST PPn 10%
444,750,000.00 44,475,000.00
100%
TOTAL COST PEMBULATAN
489,225,000.00 489,000,000.00
BIAYA LANGSUNG PERSONIL BIAYA LANGSUNG NON PERSONIL BIAYA MOBILISASI DAN DEMOBILISASI BIAYA OPERASIONAL BIAYA LAPORAN DAN DOKUMENTASI
8% 24% 4%
Terbilang : Empat Ratus Sembilan Puluh Empat Juta Tujuh Ratus ribu Rupiah
Koreksi Aritmatik Penawaran Biaya PT. Intimulya Multikencana PEKERJAAN LOKASI T.A. NO.
URAIAN
I I.1 1 2 I.2 1 2 II A
BIAYA LANGSUNG PERSONIL TENAGA AHLI Site Engineer Ahli Kualitas & Kuantitas TENAGA PENDUKUNG Inspector CAD Operator
BIAYA LANGSUNG NON PERSONIL BIAYA MOBILISASI DAN DEMOBILISASI 1 MOBILISASI DAN DEMOBILISASI
III 1 2 3 4 5 6 7 8 9 10 C 1 2 3 4 5
: SUPERVISI PEMBANGUNAN FASILITAS PELABUHAN LAUT ORANSBARI : PELABUHAN ORANSBARI, PROPINSI PAPUA BARAT : APBN 2014
BIAYA OPERASIONAL Biaya Komunikasi Sewa Rumah/Kantor Furnitur Kantor Sewa Kendaraan Roda Empat Sewa Kendaraan Roda Dua Alat Tulis Kantor Digital Camera Laptop Printer A3 Scanner A-4 BIAYA LAPORAN DAN DOKUMENTASI LAPORAN PENDAHULUAN LAPORAN HARIAN DAN MINGGUAN LAPORAN BULANAN LAPORAN AKHIR DOKUMENTASI
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
5 5
20,000,000.00 15,000,000.00
100,000,000.00 75,000,000.00
5 5
10 5
7,500,000.00 6,000,000.00 JUMLAH
75,000,000.00 30,000,000.00 280,000,000.00
5
1
5
7,500,000.00 JUMLAH
37,500,000.00 37,500,000.00
Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit
5 1 2 1 3 1 1 3 2 1
5 5 5 5 5 5 5 5 5 5
25 5 10 5 15 5 5 15 10 5
200,000.00 2,000,000.00 1,000,000.00 4,000,000.00 1,350,000.00 1,400,000.00 500,000.00 1,500,000.00 800,000.00 500,000.00 JUMLAH
5,000,000.00 10,000,000.00 10,000,000.00 20,000,000.00 20,250,000.00 7,000,000.00 2,500,000.00 22,500,000.00 8,000,000.00 2,500,000.00 107,750,000.00
Buku Buku Buku Buku Album
1 20 5 1 1
5 5 5 5 5
5 100 25 5 5
200,000.00 100,000.00 200,000.00 300,000.00 400,000.00 JUMLAH
1,000,000.00 10,000,000.00 5,000,000.00 1,500,000.00 2,000,000.00 19,500,000.00
SATUAN
VOLUME
WAKTU (BULAN)
VOLUME TOTAL
Orang Orang
1 1
5 5
Orang Orang
2 1
Trip
REKAPITULASI PENAWARAN HARGA SUPERVISI PT. Marga Nusantara Persada PEKERJAAN LOKASI T.A.
: SUPERVISI PEMBANGUNAN FASILITAS PELABUHAN LAUT ORANSBARI : PELABUHAN ORANSBARI, PROPINSI PAPUA BARAT : APBN 2014 TOTAL HARGA (Rp)
URAIAN KEGIATAN
NO.
I II
PERESENTASE (%)
282,500,000.00 210,750,000.00 58,500,000.00 138,750,000.00 13,500,000.00
BIAYA LANGSUNG PERSONIL BIAYA LANGSUNG NON PERSONIL BIAYA MOBILISASI DAN DEMOBILISASI BIAYA OPERASIONAL BIAYA LAPORAN DAN DOKUMENTASI REAL COST PPn 10%
493,250,000.00 49,325,000.00
TOTAL COST PEMBULATAN
542,575,000.00 542,575,000.00
57% 12% 28% 3% 100%
Terbilang : lima ratus empat puluh dua juta lima ratus tujuh puluh lima ribu rupiah
Koreksi Aritmatik Penawaran Biaya PT. Marga Nusantara Persada PEKERJAAN LOKASI T.A. NO.
URAIAN
I I.1 1 2 I.2 1 2 II A
BIAYA LANGSUNG PERSONIL TENAGA AHLI Site Engineer Ahli Kualitas & Kuantitas TENAGA PENDUKUNG Inspector CAD Operator
BIAYA LANGSUNG NON PERSONIL BIAYA MOBILISASI DAN DEMOBILISASI 1 MOBILISASI DAN DEMOBILISASI
III 1 2 3 4 5 6 7 8 9 10 C 1 2 3 4 5
: SUPERVISI PEMBANGUNAN FASILITAS PELABUHAN LAUT ORANSBARI : PELABUHAN ORANSBARI, PROPINSI PAPUA BARAT : APBN 2014
BIAYA OPERASIONAL Biaya Komunikasi Sewa Rumah/Kantor Furnitur Kantor Sewa Kendaraan Roda Empat Sewa Kendaraan Roda Dua Alat Tulis Kantor Digital Camera Laptop Printer A3 Scanner A-4 BIAYA LAPORAN DAN DOKUMENTASI LAPORAN PENDAHULUAN LAPORAN HARIAN DAN MINGGUAN LAPORAN BULANAN LAPORAN AKHIR DOKUMENTASI
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
5 5
16,500,000.00 14,000,000.00
82,500,000.00 70,000,000.00
5 5
10 5
10,000,000.00 6,000,000.00 JUMLAH
100,000,000.00 30,000,000.00 282,500,000.00
5
1
5
11,700,000.00 JUMLAH
58,500,000.00 58,500,000.00
Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit
5 1 2 1 3 1 1 3 2 1
5 5 5 5 5 5 5 5 5 5
25 5 10 5 15 5 5 15 10 5
1,250,000.00 2,250,000.00 1,200,000.00 7,800,000.00 750,000.00 1,500,000.00 1,000,000.00 850,000.00 650,000.00 450,000.00 JUMLAH
31,250,000.00 11,250,000.00 12,000,000.00 39,000,000.00 11,250,000.00 7,500,000.00 5,000,000.00 12,750,000.00 6,500,000.00 2,250,000.00 138,750,000.00
Buku Buku Buku Buku Album
1 20 5 1 1
5 5 5 5 5
5 100 25 5 5
150,000.00 50,000.00 200,000.00 300,000.00 250,000.00 JUMLAH
750,000.00 5,000,000.00 5,000,000.00 1,500,000.00 1,250,000.00 13,500,000.00
SATUAN
VOLUME
WAKTU (BULAN)
VOLUME TOTAL
Orang Orang
1 1
5 5
Orang Orang
2 1
Trip
REKAPITULASI PENAWARAN HARGA SUPERVISI PT. Massuka Pratama PEKERJAAN LOKASI T.A.
: SUPERVISI PEMBANGUNAN FASILITAS PELABUHAN LAUT ORANSBARI : PELABUHAN ORANSBARI, PROPINSI PAPUA BARAT : APBN 2014 TOTAL HARGA (Rp)
URAIAN KEGIATAN
NO.
I II
PERESENTASE (%)
265,000,000.00 151,000,000.00 37,500,000.00 96,250,000.00 17,250,000.00
BIAYA LANGSUNG PERSONIL BIAYA LANGSUNG NON PERSONIL BIAYA MOBILISASI DAN DEMOBILISASI BIAYA OPERASIONAL BIAYA LAPORAN DAN DOKUMENTASI REAL COST PPn 10%
416,000,000.00 41,600,000.00
TOTAL COST PEMBULATAN
457,600,000.00 457,000,000.00
64% 9% 23% 4% 100%
Terbilang : empat ratus lima puluh tujuh juta rupiah
Koreksi Aritmatik Penawaran Biaya PT. Massuka Pratama PEKERJAAN LOKASI T.A. NO.
URAIAN
I I.1 1 2 I.2 1 2 II A
BIAYA LANGSUNG PERSONIL TENAGA AHLI Site Engineer Ahli Kualitas & Kuantitas TENAGA PENDUKUNG Inspector CAD Operator
BIAYA LANGSUNG NON PERSONIL BIAYA MOBILISASI DAN DEMOBILISASI 1 MOBILISASI DAN DEMOBILISASI
III 1 2 3 4 5 6 7 8 9 10 C 1 2 3 4 5
: SUPERVISI PEMBANGUNAN FASILITAS PELABUHAN LAUT ORANSBARI : PELABUHAN ORANSBARI, PROPINSI PAPUA BARAT : APBN 2014
BIAYA OPERASIONAL Biaya Komunikasi Sewa Rumah/Kantor Furnitur Kantor Sewa Kendaraan Roda Empat Sewa Kendaraan Roda Dua Alat Tulis Kantor Digital Camera Laptop Printer A3 Scanner A-4 BIAYA LAPORAN DAN DOKUMENTASI LAPORAN PENDAHULUAN LAPORAN HARIAN DAN MINGGUAN LAPORAN BULANAN LAPORAN AKHIR DOKUMENTASI
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
5 5
19,000,000.00 15,000,000.00
95,000,000.00 75,000,000.00
5 5
10 5
7,000,000.00 5,000,000.00 JUMLAH
70,000,000.00 25,000,000.00 265,000,000.00
5
1
5
7,500,000.00 JUMLAH
37,500,000.00 37,500,000.00
Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit
5 1 2 1 3 1 1 3 2 1
5 5 5 5 5 5 5 5 5 5
25 5 10 5 15 5 5 15 10 5
250,000.00 1,850,000.00 1,000,000.00 3,000,000.00 1,250,000.00 1,200,000.00 500,000.00 1,200,000.00 800,000.00 500,000.00 JUMLAH
6,250,000.00 9,250,000.00 10,000,000.00 15,000,000.00 18,750,000.00 6,000,000.00 2,500,000.00 18,000,000.00 8,000,000.00 2,500,000.00 96,250,000.00
Buku Buku Buku Buku Album
1 20 5 1 1
5 5 5 5 5
5 100 25 5 5
200,000.00 90,000.00 150,000.00 300,000.00 400,000.00 JUMLAH
1,000,000.00 9,000,000.00 3,750,000.00 1,500,000.00 2,000,000.00 17,250,000.00
SATUAN
VOLUME
WAKTU (BULAN)
VOLUME TOTAL
Orang Orang
1 1
5 5
Orang Orang
2 1
Trip
REKAPITULASI PENAWARAN HARGA SUPERVISI PT. Pariagraha PEKERJAAN LOKASI T.A.
: SUPERVISI PEMBANGUNAN FASILITAS PELABUHAN LAUT ORANSBARI : PELABUHAN ORANSBARI, PROPINSI PAPUA BARAT : APBN 2014 TOTAL HARGA (Rp)
URAIAN KEGIATAN
NO.
I II
PERESENTASE (%)
357,500,000.00 163,250,000.00 17,500,000.00 122,500,000.00 23,250,000.00
BIAYA LANGSUNG PERSONIL BIAYA LANGSUNG NON PERSONIL BIAYA MOBILISASI DAN DEMOBILISASI BIAYA OPERASIONAL BIAYA LAPORAN DAN DOKUMENTASI REAL COST PPn 10%
520,750,000.00 52,075,000.00
TOTAL COST PEMBULATAN
572,825,000.00 572,825,000.00
69% 3% 24% 4% 100%
Terbilang : lima ratus tujuh puluh dua juta delapan ratus dua puluh lima ribu rupiah
Koreksi Aritmatik Penawaran Biaya PT. Pariagraha PEKERJAAN LOKASI T.A. NO.
URAIAN
I I.1 1 2 I.2 1 2 II A
BIAYA LANGSUNG PERSONIL TENAGA AHLI Site Engineer Ahli Kualitas & Kuantitas TENAGA PENDUKUNG Inspector CAD Operator
BIAYA LANGSUNG NON PERSONIL BIAYA MOBILISASI DAN DEMOBILISASI 1 MOBILISASI DAN DEMOBILISASI
III 1 2 3 4 5 6 7 8 9 10 C 1 2 3 4 5
: SUPERVISI PEMBANGUNAN FASILITAS PELABUHAN LAUT ORANSBARI : PELABUHAN ORANSBARI, PROPINSI PAPUA BARAT : APBN 2014
BIAYA OPERASIONAL Biaya Komunikasi Sewa Rumah/Kantor Furnitur Kantor Sewa Kendaraan Roda Empat Sewa Kendaraan Roda Dua Alat Tulis Kantor Digital Camera Laptop Printer A3 Scanner A-4 BIAYA LAPORAN DAN DOKUMENTASI LAPORAN PENDAHULUAN LAPORAN HARIAN DAN MINGGUAN LAPORAN BULANAN LAPORAN AKHIR DOKUMENTASI
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
5 5
25,000,000.00 20,000,000.00
125,000,000.00 100,000,000.00
5 5
10 5
10,000,000.00 6,500,000.00 JUMLAH
100,000,000.00 32,500,000.00 357,500,000.00
5
1
5
3,500,000.00 JUMLAH
17,500,000.00 17,500,000.00
Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit
5 1 2 1 3 1 1 3 2 1
5 5 5 5 5 5 5 5 5 5
25 5 10 5 15 5 5 15 10 5
500,000.00 3,000,000.00 1,000,000.00 7,500,000.00 1,500,000.00 500,000.00 250,000.00 1,000,000.00 500,000.00 250,000.00 JUMLAH
12,500,000.00 15,000,000.00 10,000,000.00 37,500,000.00 22,500,000.00 2,500,000.00 1,250,000.00 15,000,000.00 5,000,000.00 1,250,000.00 122,500,000.00
Buku Buku Buku Buku Album
1 20 5 1 1
5 5 5 5 5
5 100 25 5 5
100,000.00 150,000.00 200,000.00 300,000.00 250,000.00 JUMLAH
500,000.00 15,000,000.00 5,000,000.00 1,500,000.00 1,250,000.00 23,250,000.00
SATUAN
VOLUME
WAKTU (BULAN)
VOLUME TOTAL
Orang Orang
1 1
5 5
Orang Orang
2 1
Trip
REKAPITULASI PENAWARAN HARGA SUPERVISI PT. Jasakons PEKERJAAN LOKASI T.A.
: SUPERVISI PEMBANGUNAN FASILITAS PELABUHAN LAUT ORANSBARI : PELABUHAN ORANSBARI, PROPINSI PAPUA BARAT : APBN 2014 TOTAL HARGA (Rp)
URAIAN KEGIATAN
NO.
I II
PERESENTASE (%)
320,000,000.00 174,500,000.00 39,000,000.00 118,000,000.00 17,500,000.00
BIAYA LANGSUNG PERSONIL BIAYA LANGSUNG NON PERSONIL BIAYA MOBILISASI DAN DEMOBILISASI BIAYA OPERASIONAL BIAYA LAPORAN DAN DOKUMENTASI REAL COST PPn 10%
494,500,000.00 49,450,000.00
TOTAL COST PEMBULATAN
543,950,000.00 543,900,000.00
65% 8% 24% 4% 100%
Terbilang : lima puluh empat puluh tiga juta sembilan ratus ribu rupiah
Koreksi Aritmatik Penawaran Biaya PT. Jasakons PEKERJAAN LOKASI T.A. NO.
URAIAN
I I.1 1 2 I.2 1 2 II A
BIAYA LANGSUNG PERSONIL TENAGA AHLI Site Engineer Ahli Kualitas & Kuantitas TENAGA PENDUKUNG Inspector CAD Operator
BIAYA LANGSUNG NON PERSONIL BIAYA MOBILISASI DAN DEMOBILISASI 1 MOBILISASI DAN DEMOBILISASI
III 1 2 3 4 5 6 7 8 9 10 C 1 2 3 4 5
: SUPERVISI PEMBANGUNAN FASILITAS PELABUHAN LAUT ORANSBARI : PELABUHAN ORANSBARI, PROPINSI PAPUA BARAT : APBN 2014
BIAYA OPERASIONAL Biaya Komunikasi Sewa Rumah/Kantor Furnitur Kantor Sewa Kendaraan Roda Empat Sewa Kendaraan Roda Dua Alat Tulis Kantor Digital Camera Laptop Printer A3 Scanner A-4 BIAYA LAPORAN DAN DOKUMENTASI LAPORAN PENDAHULUAN LAPORAN HARIAN DAN MINGGUAN LAPORAN BULANAN LAPORAN AKHIR DOKUMENTASI
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
5 5
21,000,000.00 18,000,000.00
105,000,000.00 90,000,000.00
5 5
10 5
9,000,000.00 7,000,000.00 JUMLAH
90,000,000.00 35,000,000.00 320,000,000.00
5
1
5
7,800,000.00 JUMLAH
39,000,000.00 39,000,000.00
Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit
5 1 2 1 3 1 1 3 2 1
5 5 5 5 5 5 5 5 5 5
25 5 10 5 15 5 5 15 10 5
400,000.00 2,000,000.00 1,000,000.00 4,500,000.00 1,500,000.00 1,500,000.00 500,000.00 1,500,000.00 800,000.00 500,000.00 JUMLAH
10,000,000.00 10,000,000.00 10,000,000.00 22,500,000.00 22,500,000.00 7,500,000.00 2,500,000.00 22,500,000.00 8,000,000.00 2,500,000.00 118,000,000.00
Buku Buku Buku Buku Album
1 20 5 1 1
5 5 5 5 5
5 100 25 5 5
200,000.00 80,000.00 200,000.00 300,000.00 400,000.00 JUMLAH
1,000,000.00 8,000,000.00 5,000,000.00 1,500,000.00 2,000,000.00 17,500,000.00
SATUAN
VOLUME
WAKTU (BULAN)
VOLUME TOTAL
Orang Orang
1 1
5 5
Orang Orang
2 1
Trip