HASIL KOREKSI ARITMATIK KEGIATAN
: KEGIATAN PEMBANGUNAN JALAN DAN JEMBATAN APBD KOTA PEKANBARU TAHUN ANGGARAN 2011 PEKERJAAN : JALAN MURAI PENGASPALAN HOTMIX PJG :0,575 KM, LEBAR : 4 M PEMBUATAN PARIT COR UK. 50 CM PJG : 131 M PEMBUATAN BOX CULVERT UK. 0,8 x 0,8 M PJG : 7 M LOKASI KOTA HPS / OE
: KECAMATAN RUMBAI : PEKANBARU : Rp 976,159,000.00
NO
NAMA PERUSAHAAN
1
2
TOTAL HARGA PENAWARAN SAAT PEMBUKAAN PENAWARAN (Rp.) 3
TOTAL HARGA PERSENTASE URUTAN TERKOREKSI HARGA TERKOREKSI PERINGKAT TERHADAP VOLUME TERHADAP HPS / OE HPS/ OE (Rp.) (%) 4 5 = 4:HPS X 100 6
1
CV. BINA USAHA ABADI
956,449,000.00
956,449,000.00
97.98
1
2
CV. ARYA ABADI
965,849,000.00
965,849,000.00
98.94
2
Pekanbaru,
April 2011
TTD PANITIA PENGADAAN BARANG/JASA DILINGKUNGAN DINAS PEKERJAAN UMUM BIDANG BINAMARGA
KETERANGAN
7
HASIL KOREKSI ARITMATIK KEGIATAN
: KEGIATAN PEMBANGUNAN JALAN DAN JEMBATAN APBD KOTA PEKANBARU TAHUN ANGGARAN 2011 PEKERJAAN : JALAN ALAMANDA PENGASPALAN HOTMIX PJG : 0.330 KM, LEBAR : 4 M JALAN BUNGA RAYA I OVERLAY HOTMIX PJG : 0.170 KM, LEBAR : 4 M JALAN RAWA BENING I, PENGASPALAN HOTMIX PANJANG 0.500 KM LEBAR 4 M PEMBUATAN PARIT UK 40 CM PJG : 672 M' PEMBUATAN PARIT UK 50 CM PJG : 65 M'
LOKASI KOTA HPS / OE
: KECAMATAN BUKIT RAYA : PEKANBARU : Rp 1,680,799,000.00
NO
NAMA PERUSAHAAN
1
2
1
PT. SURYA MANDIRI PRATAMA
TOTAL HARGA PENAWARAN SAAT PEMBUKAAN PENAWARAN (Rp.) 3
1,593,730,000.00
TOTAL HARGA PERSENTASE URUTAN TERKOREKSI HARGA TERKOREKSI PERINGKAT TERHADAP VOLUME TERHADAP HPS / OE HPS/ OE (Rp.) (%) 4 5 = 4:HPS X 100 6
1,345,235,000.00
80.04
1
KETERANGAN
7
KESALAHAN VOLUME PEKERJAAN
DIV 6 SELURUHNYA
2
PT. ILHAM PANGESTU KARYA
1,637,344,000.00
1,637,344,000.00
97.41
2
3
PT. CITRA HOKKIANA TRIUTAMA
1,647,369,500.00
1,647,369,000.00
98.01
3
4
PT. PUTRA SULUNG MAS SEJAHTERA
1,658,224,000.00
1,658,224,000.00
98.66
4
PEMBULATAN HARGA
Pekanbaru, April 2011 TTD PANITIA PENGADAAN BARANG / JASA DILINGKUNGAN DINAS PEKERJAAN UMUM KOTA PEKANBARU BIDANG BINA MARGA
HASIL KOREKSI ARITMATIK
KEGIATAN
: PEMBANGUNAN JALAN KOTA PEKANBARU T.A 2011
PEKERJAAN
: JALAN KAMPAR DAN JL. KAPAS MENUJU MESJID AL-HUSNI PENGASPALAN HOTMIX PJG : 0.836 KM, LEBAR : 4 M PEMBUATAN PARIT COR UK. 50 CM PANJANG = 1169 M PEMBUATAN BOX CULVERT UK. 0,8 X O,8 CM PANJANG = 18 M
LOKASI
: KECAMATAN TENAYAN RAYA
KOTA
: PEKANBARU
HPS / OE
:
1,772,289,000.00
NO
NAMA PERUSAHAAN
1
2
TOTAL HARGA PENAWARAN SAAT PEMBUKAAN PENAWARAN (Rp.) 3
TOTAL HARGA PROSENTASE URUTAN HARGA TERKOREKSI PERINGKAT TERKOREKSI TERHADAP VOLUME TERHADAP HPS / OE HPS / OE (Rp.) (%) 4 5 = 4:HPS X 100 6
1
PT. CITRA HOKIANA TRIUTAMA
1,718,848,400.00
1,718,848,000.00
96.98
1
2
PT. PUTRA SULUNG MAS SEJAHTERA
1,725,661,000.00
1,725,661,000.00
97.37
2
3
PT. ILHAM PANGESTU KARYA
1,754,972,000.00
1,754,972,000.00
99.02
3
Pekanbaru,
KETERANGAN
7
Pembulatan Harga
April 2011
TTD PANITIA PENGADAAN BARANG/JASA DILINGKUNGAN DINAS PEKERJAAN UMUM BIDANG BINAMARGA
HASIL KOREKSI ARITMATIK
KEGIATAN
: PEMBANGUNAN JALAN DAN JEMBATAN KOTA PEKANBARU T.A 2011
PEKERJAAN : JALAN MATADOR RW 25 KEL. SAIL PENGASPALAN HOTMIX PJG : 0.700 KM, LEBAR : 4 M PARIT BETON UK 50 CM, PJG : 790 M PEMBUATAN TURAP TGGI: 1-2 M PJG : 50 M BOX UK. 0.8 X 0.8, PJG : 12 M
LOKASI
: KECAMATAN TENAYAN RAYA
KOTA
: PEKANBARU
HPS / OE
:
1,562,959,000.00
NO
NAMA PERUSAHAAN
1
2
TOTAL HARGA PENAWARAN SAAT PEMBUKAAN PENAWARAN (Rp.) 3
TOTAL HARGA PROSENTASE URUTAN TERKOREKSI HARGA TERKOREKSI PERINGKAT TERHADAP VOLUME TERHADAP HPS / OE HPS / OE (Rp.) (%) 4 5 = 4:HPS X 100 6
KETERANGAN
7
1
PT. AMIZA CITRA INSANI
1,516,836,071.00
1,516,836,000.00
97.05
1
Pembulatan Harga
2
PT. SAPTA KARYA
1,521,313,349.00
1,521,313,000.00
97.34
2
Pembulatan Harga
3
PT. RANTAU PERJUANGAN
1,542,991,120.00
1,542,991,000.00
98.72
3
Pembulatan Harga
Pekanbaru,
April 2011
TTD PANITIA PENGADAAN BARANG/JASA DILINGKUNGAN DINAS PEKERJAAN UMUM BIDANG BINAMARGA
HASIL KOREKSI ARITMATIK
KEGIATAN
: PEMBANGUNAN JALAN DAN JEMBATAN KOTA PEKANBARU T.A 2011
PEKERJAAN : JALAN PINANG MERAH DAN JALAN PESANTREN DAN JALAN SELAMAT Gg. SELAMAT JALAN PINANG MERAH, OVERLAY HOTMIX PANJANG = 0,750 KM, LEBAR = 4 M JALAN PESANTREN RW. 08 KEL. TKR TIMUR, OVERLAY HOTMIX P = 0,900 KM, LEBAR = 4 M JALAN DAHLIA INDAH, OVERLAY HOTMIX P = 0,300 KM, LEBAR = 4 M JALAN SELAMAT Gg. SELAMAT, PENGASPALAN HOTMIX P = 0,200 KM, LEBAR = 4 M PEKERJAAN PARIT UK. 50 CM PANJANG = 100 M
LOKASI
: KECAMATAN TENAYAN RAYA
KOTA
: PEKANBARU
HPS / OE
:
1,780,788,000.00
NO
NAMA PERUSAHAAN
1
2
TOTAL HARGA PENAWARAN SAAT PEMBUKAAN PENAWARAN (Rp.) 3
URUTAN TOTAL HARGA PROSENTASE TERKOREKSI HARGA TERKOREKSI PERINGKAT TERHADAP VOLUME TERHADAP HPS / OE HPS / OE (Rp.) (%) 4 5 = 4:HPS X 100 6
1
PT. DUTA KARYA MANDIRI PERKASA
1,727,405,000.00
1,727,405,000.00
97.00
1
2
PT. PAYUNG PUSAKA NEGERI
1,736,317,247.00
1,736,317,000.00
97.50
2
3
PT. ASKA NIAGA
1,745,172,556.00
1,745,172,000.00
98.00
3
Pekanbaru,
KETERANGAN
7
April 2011
TTD PANITIA PENGADAAN BARANG/JASA DILINGKUNGAN DINAS PEKERJAAN UMUM BIDANG BINAMARGA
HASIL KOREKSI ARITMATIK
KEGIATAN
: PEMBANGUNAN JALAN DAN JEMBATAN KOTA PEKANBARU T.A 2011
PEKERJAAN : JALAN TENAYAN JAYA TAHAP I KEL. REJOSARI PENGASPALAN HOTMIX PJG : 0.500 KM, LEBAR : 4 M OVERLAY HOTMIX PJG : 1.125 KM, LEBAR : 4 M PARIT BETON UK 50 CM, PJG : 391 M
LOKASI
: KECAMATAN TENAYAN RAYA
KOTA
: PEKANBARU
HPS / OE
:
1,774,462,000.00
NO
NAMA PERUSAHAAN
1
2
TOTAL HARGA PENAWARAN SAAT PEMBUKAAN PENAWARAN (Rp.) 3
TOTAL HARGA PROSENTASE URUTAN TERKOREKSI HARGA TERKOREKSI PERINGKAT TERHADAP VOLUME TERHADAP HPS / OE HPS / OE (%) (Rp.) 4 5 = 4:HPS X 100 6
KETERANGAN
7
1
PT. RIO INDO SEJAHTERA
1,651,840,000.00
1,651,844,000.00
93.09
1
Pembulatan Harga
2
PT. SARANA INDAH PERKASA ABADI
1,692,230,000.00
1,692,231,000.00
95.37
2
Pembulatan Harga
3
PT. CITRA HOKIANA TRIUTAMA
1,702,010,000.00
1,702,010,000.00
95.92
3
4
PT. PUTRA SULUNG MAS SEJAHTERA
1,739,266,000.00
1,739,266,000.00
98.02
4
5
PT. ILHAM PANGESTU KARYA
1,751,276,000.00
1,751,276,000.00
98.69
5
Pekanbaru,
April 2011
TTD PANITIA PENGADAAN BARANG/JASA DILINGKUNGAN DINAS PEKERJAAN UMUM BIDANG BINAMARGA
HASIL KOREKSI ARITMATIK
KEGIATAN
: PEMBANGUNAN JALAN DAN JEMBATAN KOTA PEKANBARU T.A 2011
PEKERJAAN : JALAN SWADAYA I, PERKASA, BAMBU KUNING, SATRIA JALAN SWADAYA I, JL. PERKASA, OVERLAY HOTMIX PJG : 0.830 KM, LEBAR : 4 - 5 M JALAN BAMBU KUNING, PENGASPALAN HOTMIX PJG : 0.100 KM, LEBAR : 5.6 M JALAN SATRIA, PELEBARAN HOTMIX PJG : 0.200 KM, LEBAR : 2.10 - 4.4 M
LOKASI
: KECAMATAN TENAYAN RAYA
KOTA
: PEKANBARU
HPS / OE
:
1,033,988,000.00
NO
NAMA PERUSAHAAN
1
2
1
PT. AMIZA CITRA INSANI
2
PT. RANTAU PERJUANGAN
3
PT. SAPTA KARYA
TOTAL HARGA PENAWARAN SAAT PEMBUKAAN PENAWARAN (Rp.) 3
TOTAL HARGA PROSENTASE URUTAN TERKOREKSI HARGA TERKOREKSI PERINGKAT TERHADAP VOLUME TERHADAP HPS / OE HPS / OE (Rp.) (%) 5 = 4:HPS X 100 4 6
KETERANGAN
7
1,019,044,000.00
98.55
1
DIV. 6.1(2) Tdk Sesuai
992,840,033.00
992,852,000.00
96.02
2
DIV. 6.1(2) Tdk Sesuai
1,020,586,992.00
1,020,600,000.00
98.71
3
DIV. 6.1(2) Tdk Sesuai
1,019,030,658.00
Pekanbaru,
April 2011
TTD PANITIA PENGADAAN BARANG/JASA DILINGKUNGAN DINAS PEKERJAAN UMUM BIDANG BINAMARGA
HASIL KOREKSI ARITMATIK
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN KOTA PEKANBARU T.A 2011 PEKERJAAN : JALAN PISANG KEL. LIMBUNGAN, JALAN PUTRI AYU DAN JALAN H.M.NUR JALAN PISANG PENGASPALAN HOTMIX PJG :0,150 KM, LEBAR : 4,5 M PEMBUATAN BOX CULVERT UK. 0,8 x 0,8 PJG : 8 M JALAN PUTRI AYU PENGASPALAN HOTMIX PJG :0,350 KM, LEBAR : 4 M JALAN H.M NUR OVERLAY HOTMIX PJG :0,500 KM, LEBAR : 4 M
LOKASI KOTA
: KECAMATAN RUMBAI PESISIR : PEKANBARU
HPS / OE
:
Rp
1,239,296,000.00 TOTAL HARGA TOTAL HARGA PROSENTASE URUTAN PENAWARAN TERKOREKSI HARGA TERKOREKSI PERINGKAT SAAT PEMBUKAAN TERHADAP VOLUME TERHADAP PENAWARAN HPS / OE HPS / OE (Rp.) (Rp.) (%) 3 4 5 = 4:HPS X 100 6
NO
NAMA PERUSAHAAN
1
2
1
PT. BANGUN PURBA SATAHI
1,207,342,500.00
1,207,342,000.00
97.42
1
2
PT. SEMANGAT HASRAT JAYA
1,211,188,900.00
1,211,188,000.00
97.73
2
3
PT. HASAMA SAKTI
1,215,454,400.00
1,215,454,000.00
98.08
3
4
PT. RIVAL UTAMA
1,219,963,300.00
1,219,963,000.00
98.44
4
5
PT. AQEELA PUTERI PRATAMA
-
5
-
-
Pekanbaru,
KETERANGAN
7
Tidak mengirimkan penawaran
April 2011
TTD PANITIA PENGADAAN BARANG/JASA DILINGKUNGAN DINAS PEKERJAAN UMUM BIDANG BINAMARGA
HASIL KOREKSI ARITMATIK
KEGIATAN : PEMBANGUNAN JALAN DAN JEMBATAN KOTA PEKANBARU T.A 2011 PEKERJAAN : JALAN PRAMUKA LANJUTAN DAN JALAN SMP 15 JALAN PRAMUKA LANJUTAN PELEBARAN HOTMIX PJG :1,4000 KM, LEBAR : 6 M JALAN SMP 15 OVERLAY HOTMIX PJG :0,300 KM, LEBAR : 4,5 M
LOKASI KOTA
: KECAMATAN RUMBAI PESISIR : PEKANBARU
HPS / OE
:
Rp
2,279,252,000.00
NO
NAMA PERUSAHAAN
1
2
TOTAL HARGA TOTAL HARGA PROSENTASE URUTAN PENAWARAN TERKOREKSI HARGA TERKOREKSI PERINGKAT SAAT PEMBUKAAN TERHADAP VOLUME TERHADAP PENAWARAN HPS / OE HPS / OE (Rp.) (Rp.) (%) 3 4 5 = 4:HPS X 100 6
KETERANGAN
7
1
PT. HASRAT TATA JAYA
2,233,334,800.00
2,233,334,000.00
97.99
1
Pembulatan penawaran
2
PT. SEMANGAT HASRAT JAYA
2,240,754,600.00
2,240,754,000.00
98.31
2
Pembulatan penawaran
3
PT. BANGUN PURBA SATAHI
2,241,350,900.00
2,241,350,000.00
98.34
3
Pembulatan penawaran
4
PT. HASAMA SAKTI
2,247,045,100.00
2,247,045,000.00
98.59
4
Pembulatan penawaran
5
PT. KARYA GUMPALA SEJATI
0.00
5
Penawaran tidak dikirimkan
-
-
Pekanbaru,
April 2011
TTD PANITIA PENGADAAN BARANG/JASA DILINGKUNGAN DINAS PEKERJAAN UMUM BIDANG BINAMARGA
HASIL KOREKSI ARITMATIK
KEGIATAN
: PEMBANGUNAN JALAN KOTA PEKANBARU T.A 2011
PEKERJAAN : JALAN SIDODADI DAN JALAN SENANTIASA JALAN SIDODADI OVERLAY HOTMIX PJG : 0,250 KM, LEBAR : 4 M JALAN SIDODADI PENGERASAN PJG : 0,500 KM, LEBAR : 5 M PEMBUATAN PARIT COR UK. 50 CM PJG : 194 M PEMBUATAN BOX CULVERT UK. 0,8 x 0,8 CM PJG : 7 M JALAN SENANTIASA PENGASPALAN HOTMIX PJG : 0,200 KM, LEBAR : 4 M
LOKASI
: KECAMATAN PAYUNG SEKAKI
KOTA
: PEKANBARU
HPS / OE
:
1,058,305,000.00
NO
NAMA PERUSAHAAN
1
2
TOTAL HARGA PENAWARAN SAAT PEMBUKAAN PENAWARAN (Rp.) 3
URUTAN TOTAL HARGA PROSENTASE TERKOREKSI HARGA TERKOREKSI PERINGKAT TERHADAP VOLUME TERHADAP HPS / OE HPS / OE (Rp.) (%) 4 5 = 4:HPS X 100 6
1
PT. CITRA HOKIANA TRIUTAMA
1,029,182,700.00
1,029,182,000.00
97.25
1
2
PT. ILHAM PANGESTU KARYA
1,034,526,000.00
1,034,526,000.00
97.75
2
3
PT. PUTRA SULUNG MAS SEJAHTERA
1,047,868,000.00
1,047,868,000.00
99.01
3
Pekanbaru,
KETERANGAN
7
Pembulatan Harga
April 2011
TTD PANITIA PENGADAAN BARANG/JASA DILINGKUNGAN DINAS PEKERJAAN UMUM BIDANG BINAMARGA
HASIL KOREKSI ARITMATIK
KEGIATAN
: PEMBANGUNAN JALAN DAN JEMBATAN KOTA PEKANBARU T.A 2011 : APBD KOTA PEKANBARU TAHUN ANGGARAN 2011
PEKERJAAN
: JL. MELEM LANJUTAN OVERLAY HOTMIX PANJANG : 0,400 KM, LEBAR : 4 M PENGERASAN PANJANG : 0,500 KM, LEBAR : 5 M PARIT BETON UK, 60 CM, PJG : 1,000 M' BOX UK, 0,8 X 0,8 M, PJG : 12 M'
LOKASI
: KECAMATAN MARPOYAN DAMAI
KOTA
: PEKANBARU
HPS / OE
:
1,287,275,000.00
NO
NAMA PERUSAHAAN
1
2
TOTAL HARGA PENAWARAN SAAT PEMBUKAAN PENAWARAN (Rp.) 3
TOTAL HARGA TERKOREKSI TERHADAP VOLUME HPS / OE (Rp.) 4
PROSENTASE URUTAN HARGA TERKOREKSI PERINGKAT TERHADAP HPS / OE (%) 5 = 4:HPS X 100 6
1
PT. VIRAJAYA RIAUPUTRA
1,249,362,439.00
1,249,362,000.00
97.05
1
2
PT. TIGA PILAR SEJATI
1,255,378,000.00
1,255,378,000.00
97.52
2
3
CV. PUTRA LANCANG KUNING
1,275,702,741.00
1,275,702,000.00
99.10
3
4
CV. GAMANA PRATAMA
1,280,522,000.00
1,280,522,000.00
99.48
4
Pekanbaru,
KETERANGAN
April 2011
TTD PANITIA PENGADAAN BARANG/JASA DILINGKUNGAN DINAS PEKERJAAN UMUM BIDANG BINAMARGA
7
HASIL KOREKSI ARITMATIK
KEGIATAN
: PEMBANGUNAN JALAN DAN JEMBATAN KOTA PEKANBARU T.A 2011 : APBD KOTA PEKANBARU TAHUN ANGGARAN 2011
PEKERJAAN
: JL. GARUDA UJUNG OVERLAY DAN PELEBARAN HOTMIX PANJANG : 1,000 KM, LEBAR : 5 M
LOKASI
: KECAMATAN MARPOYAN DAMAI
KOTA
: PEKANBARU
HPS / OE
:
1,192,084,000.00
NO
NAMA PERUSAHAAN
1
2
TOTAL HARGA PENAWARAN SAAT PEMBUKAAN PENAWARAN (Rp.) 3
TOTAL HARGA TERKOREKSI TERHADAP VOLUME HPS / OE (Rp.) 4
PROSENTASE URUTAN HARGA TERKOREKSI PERINGKAT TERHADAP HPS / OE (%) 5 = 4:HPS X 100 6
1
PT. SARANA INDAH PERKASA ABADI
1,150,358,000.00
1,150,358,000.00
96.50
1
2
PT. SURYA MANDIRI PRATAMA
1,156,514,000.00
1,156,514,000.00
97.02
2
3
PT. RIO INDO SEJAHTERA
1,162,322,000.00
1,162,322,000.00
97.50
3
4
PT. SURYA SINDO SEJAHTERA
1,168,382,000.00
1,168,382,000.00
98.01
4
Pekanbaru,
KETERANGAN
April 2011
TTD PANITIA PENGADAAN BARANG/JASA DILINGKUNGAN DINAS PEKERJAAN UMUM BIDANG BINAMARGA
7
HASIL KOREKSI ARITMATIK
KEGIATAN
: PEMBANGUNAN JALAN DAN JEMBATAN KOTA PEKANBARU T.A 2011 : APBD KOTA PEKANBARU TAHUN ANGGARAN 2011
PEKERJAAN
: JL. PAUS LANJUTAN OVERLAY DAN PELEBARAN HOTMIX PANJANG : 0,600 KM, LEBAR : 8 M PARIT BETON UK, 150 CM, PJG : 600 M'
LOKASI
: KECAMATAN MARPOYAN DAMAI
KOTA
: PEKANBARU
HPS / OE
:
1,948,309,000.00
NO
NAMA PERUSAHAAN
1
2
TOTAL HARGA PENAWARAN SAAT PEMBUKAAN PENAWARAN (Rp.) 3
TOTAL HARGA TERKOREKSI TERHADAP VOLUME HPS / OE (Rp.) 4
PROSENTASE URUTAN HARGA TERKOREKSI PERINGKAT TERHADAP HPS / OE (%) 5 = 4:HPS X 100 6
1
PT. VIRAJAYA RIAUPUTRA
1,895,562,398.00
1,895,562,000.00
97.29
1
2
PT. TIGA PILAR SEJATI
1,907,863,000.00
1,907,863,000.00
97.92
2
3
CV. PUTRA LANCANG KUNING
1,934,212,766.00
1,934,212,000.00
99.28
3
4
CV. GAMANA PRATAMA
1,943,559,000.00
1,943,559,000.00
99.76
4
Pekanbaru,
KETERANGAN
April 2011
TTD PANITIA PENGADAAN BARANG/JASA DILINGKUNGAN DINAS PEKERJAAN UMUM BIDANG BINAMARGA
7
HASIL KOREKSI ARITMATIK
KEGIATAN
: KEGIATAN PEMBANGUNAN JALAN APBD KOTA PEKANBARU TAHUN ANGGARAN 2011
PEKERJAAN : JALAN DWIKORA OVERLAY HOTMIX PJG : 0,225 KM, LEBAR : 4,5 M
LOKASI
: KECAMATAN SAIL
KOTA
: PEKANBARU
HPS / OE
:
378,171,000.00
NO
NAMA PERUSAHAAN
1
2
TOTAL HARGA PENAWARAN SAAT PEMBUKAAN PENAWARAN (Rp.) 3
TOTAL HARGA TERKOREKSI TERHADAP VOLUME HPS / OE (Rp.) 4
PROSENTASE URUTAN HARGA TERKOREKSI PERINGKAT TERHADAP HPS / OE (%) 5 = 4:HPS X 100 6
KETERANGAN
7
1
PT. KARYA GUMPALA SEJATI
361,928,347.82
361,928,000.00
95.70
1
Pembulatan Angka
2
PT. AQEELA PUTERI PRATAMA
364,102,504.84
364,102,000.00
96.28
2
Pembulatan Angka
3
CV. MULIA ABDI PERDANA
366,596,595.76
366,596,000.00
96.94
3
Pembulatan Angka
Pekanbaru,
April 2011
TTD PANITIA PENGADAAN BARANG/JASA DILINGKUNGAN DINAS PU BIDANG BINA MARGA
HASIL KOREKSI ARITMATIK
KEGIATAN
: KEGIATAN PEMBANGUNAN JALAN APBD KOTA PEKANBARU TAHUN ANGGARAN 2011
PEKERJAAN : JALAN MANGGA I, II DAN III OVERLAY HOTMIX PJG : 0,636 KM, LEBAR : 3,75 M
LOKASI
: KECAMATAN SUKAJADI
KOTA
: PEKANBARU
HPS / OE
:
398,679,000.00
NO
NAMA PERUSAHAAN
1
2
TOTAL HARGA PENAWARAN SAAT PEMBUKAAN PENAWARAN (Rp.) 3
TOTAL HARGA TERKOREKSI TERHADAP VOLUME HPS / OE (Rp.) 4
URUTAN PROSENTASE HARGA TERKOREKSI PERINGKAT TERHADAP HPS / OE (%) 5 = 4:HPS X 100 6
KETERANGAN
7
1
PT. KARYA GUMPALA SEJATI
388,851,786.53
388,851,000.00
97.53
1
Pembulatan Angka
2
PT. AQEELA PUTERI PRATAMA
389,819,742.34
389,819,000.00
97.78
2
Pembulatan Angka
3
CV. MULIA ABDI PERDANA
392,594,318.46
392,594,000.00
98.47
3
Pembulatan Angka
Pekanbaru,
April 2011
TTD PANITIA PENGADAAN BARANG/JASA DILINGKUNGAN DINAS PU BIDANG BINA MARGA