PT. MAIRODI MANDIRI SEJAHTERA TRAINING, CONSULTING & ENGINEERING SERVICES Alamat: Gedung Dapenpos Lt.2, Jl. PH.H. Mustofa No.35 , Bandung, Indonesia, 40124 Telp/Fax: +62-22- 7215416 / 7215668 Homepage: www.mairodi-training.com
Agenda Training Bandung 2017 No.
Judul
Durasi
Jan
Feb
Mar
Apr
Mei
Jun
Juli
Aug
Sep
Okt
Nov
Des
Harga
4
23-26
20-23
21-24
24-27
02-05
12-15
24-27
31-03
25-28
23-26
21-24
18-21
7.950.000
4
17-20
14-17
14-17
18-21
30-02
06-09
18-21
28-31
19-22
17-20
14-17
11-14
7.950.000
4
17-20
14-17
14-17
18-21
16-19
05-08
18-21
21-24
19-22
17-20
14-17
19-22
7.950.000
4 4
10-13 02-05
07-10 30-02
28-31 14-17
10-13 03-06
09-12 02-05
12-15 05-08
11-14 03-06
08-11 31-03
12-15 04-07
10-13 02-05
28-01 14-17
05-08 04-07
7.950.000 7.950.000
ENGINEERING 1 2 3 4 5
SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL PRODUCTION SAFETY SYSTEM Statistical Process Control BERBASIS MINITAB 14 BASIC CIVIL CARTOGRAFI
6
CATHODIC PROTECTION CORROSION CONTROL AND PREVENTION
4
09-12
06-09
21-24
10-13
08-11
12-15
10-13
07-10
11-14
09-12
21-24
12-15
7.950.000
7
CIVIL CONSTRUCTION OBSERVATION of EXECUTION BUILDING
4
10-13
07-10
13-16
10-13
09-12
12-15
11-14
08-11
12-15
10-13
13-16
18-21
7.950.000
8
CIVIL CONSTRUCTION PENGAWASAN PELAKSANAAN BANGUNAN
4
17-20
14-17
20-23
18-21
16-19
06-09
18-21
22-25
19-22
17-20
20-23
04-07
7.950.000
9
CONTROL VALVE AND VALVE OPERATION AND SIZING
4
02-05
30-02
28-03
03-06
02-05
05-08
03-06
31-03
04-07
02-05
31-03
19-22
7.950.000
10 11 12
DOKUMEN KONTROL FUZZY LOGIC CONTROL GAS AND LIQUID FLOW MEASUREMENT
4 4 4
23-26 24-27 02-05
20-23 21-24 30-02
21-24 13-16 20-23
24-27 25-28 03-06
29-01 30-02 02-05
13-16 13-16 05-08
24-27 25-28 03-06
28-31 28-31 31-03
25-28 26-29 04-07
23-26 24-27 02-05
21-24 13-16 20-23
18-21 05-08 11-14
7.950.000 7.950.000 7.950.000
13
PROCESS CONTROL SYSTEMS APPLICATION, DESIGN, AND TUNING
4
23-26
20-23
27-02
24-27
29-01
13-16
24-27
28-31
25-28
23-26
30-02
12-15
7.950.000
14
SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA)
4
02-05
30-02
28-03
03-06
02-05
05-08
03-06
31-03
04-07
02-05
31-03
04-07
7.950.000
4
09-12
06-09
07-10
10-13
08-11
12-15
10-13
07-10
11-14
09-12
07-10
12-15
7.950.000
3
02-04
30-01
06-08
03-05
22-24
19-21
03-05
14-16
04-06
02-04
06-08
27-29
5.950.000
15 16 17
Survey & Mapping PRESSURE SAFETY VALVE SELECTION AND SIZING CHOKE AND CONTROL VALVE
4
17-20
14-17
27-02
18-21
15-18
05-08
18-21
21-24
19-22
17-20
30-02
11-14
7.950.000
18
MARINE CORROSION AND PREVENTION FOR OFFSHORE STRUCTURE
3
16-18
13-15
06-08
17-19
08-10
19-21
17-19
07-09
18-20
16-18
06-08
18-20
6.500.000
19 20 21
ADVANCED FLOW MEASUREMENT ADVANCED PID CONTROLLER CONTROL AND CHOKE VALVES
4 4 4
09-12 16-19 23-26
06-09 13-16 20-23
06-09 13-16 20-23
10-13 17-20 24-27
08-11 15-18 29-01
05-08 12-15 06-09
10-13 17-20 24-27
07-10 21-24 28-31
11-14 18-21 25-28
09-12 16-19 23-26
06-09 13-16 20-23
11-14 18-21 04-07
8.500.000 8.500.000 8.500.000
22
CONTROL SYSTEM FUNDAMENTALS
4
02-05
30-02
27-30
03-06
02-05
13-16
03-06
31-03
04-07
02-05
27-30
12-15
8.500.000
23
FIELDBUS AND INDUSTRIAL DATA COMMUNICATION
4
03-06
31-03
21-24
04-07
02-05
13-16
04-07
01-04
05-08
03-06
21-24
18-21
8.500.000
24 25
FISCAL AND CUSTODY METERING FLOW ASSURANCE IN PIPING SYSTEMS
4 4
09-12 16-19
06-09 13-16
28-31 27-02
10-13 17-20
08-11 15-18
06-09 12-15
10-13 17-20
07-10 21-24
11-14 18-21
09-12 16-19
28-01 30-02
04-07 12-15
8.500.000 8.500.000
26
FLUID FLOW – GAS METERING AND CUSTODY TRANSFER
5
23-27
20-24
06-10
24-28
29-02
05-09
24-28
31-04
25-29
23-27
06-10
18-22
9.500.000
27 28 29 30 31 32
HUMAN MACHINE INTERFACE (HMI) OPC (OPEN PROCESS CONTROL) ROOT CAUSE FAILURE ANALYSIS (RCFA) SAFETY INSTRUMENTED SYSTEMS (SIS) ISA, IEC SCADA SYSTEMS Ultrasonic Gas Flow Meter
4 4 4 4 4 5
02-05 10-13 03-06 09-12 16-19 23-27
30-02 07-10 31-03 06-09 13-16 20-24
13-16 20-23 06-09 14-17 21-24 27-31
03-06 10-13 04-07 10-13 17-20 24-28
02-05 09-12 02-05 08-11 15-18 29-02
13-16 05-08 13-16 05-08 12-15 05-09
03-06 11-14 04-07 10-13 17-20 24-28
28-31 08-11 31-03 07-10 21-24 31-04
04-07 12-15 05-08 11-14 18-21 25-29
02-05 10-13 03-06 09-12 16-19 23-27
13-16 20-23 06-09 14-17 21-24 27-01
05-08 11-14 12-15 19-22 05-08 11-15
8.500.000 8.500.000 8.500.000 8.500.000 8.500.000 9.500.000
33
WELLHEAD INSTRUMENTATION AND HYDRAULIC CONTROL SYSTEMS
4
02-05
30-02
27-02
03-06
02-05
13-16
03-06
28-31
04-07
02-05
30-02
18-21
8.500.000
34
WIRELESS LAN IN INDUSTRIAL AUTOMATION & ISA 100.11a
4
10-13
07-10
07-10
10-13
09-12
05-08
11-14
08-11
12-15
10-13
07-10
04-07
8.500.000
35
CALIBRATION ISO IEC 17025
4
17-20
14-17
13-16
18-21
16-19
12-15
18-21
22-25
19-22
17-20
13-16
11-14
8.500.000
36
DESIGN OF EXPRIMENTS (DOE) FUNDAMENTAL CONCEPT AND APPLICATION
4
16-19
13-16
13-16
17-20
15-18
05-08
17-20
21-24
18-21
16-19
13-16
18-21
8.500.000
37
Electrical Test Instrumentation dan Sistem Pengukuran (Measurements)
4
23-26
20-23
20-23
24-27
29-01
12-15
24-27
28-31
25-28
23-26
20-23
04-07
8.500.000
Instrumentation Systems Measurements Systems Energy Audit and Application STATISTIK INDUSTRI CATHODIC PROTECTION FOR MINE STEEL STRUCTURE AND MINING SUPORTING FACILITIES Cathodic Protection for Onshore and Offshore Structure
4 4 4 4
02-05 09-12 23-26 02-05
30-02 06-09 20-23 30-02
27-30 27-02 13-16 20-23
03-06 10-13 24-27 03-06
02-05 08-11 29-01 29-01
06-09 13-16 12-15 05-08
03-06 10-13 24-27 03-06
31-03 07-10 28-31 28-31
04-07 11-14 25-28 04-07
02-05 09-12 23-26 02-05
27-30 30-02 13-16 20-23
11-14 19-22 11-14 11-14
8.500.000 8.500.000 8.500.000 7.950.000
4
23-26
20-23
13-16
24-27
15-18
05-08
24-27
21-24
25-28
23-26
13-16
04-07
8.750.000
4
02-05
30-02
20-23
03-06
29-01
12-15
03-06
28-31
04-07
02-05
20-23
11-14
8.750.000
44
CORROSION AND SCALING PREVENTION
4
16-19
13-16
27-02
17-20
08-11
13-16
17-20
07-10
18-21
16-19
30-02
05-08
8.750.000
45
Corrosion Engineering for Non Corrosion Engineers
4
24-27
21-24
06-09
25-28
16-19
05-08
25-28
22-25
26-29
24-27
06-09
12-15
8.750.000
46
INTERNAL AND EXTERNAL CORROSION CONTROL AND MONITORING FOR PIPELINE AND SURFACE FACILITY
4
23-26
20-23
28-03
24-27
15-18
05-08
24-27
21-24
25-28
23-26
31-03
18-21
8.750.000
47
CCTV INSTALASI, PEMROGRAMAN DAN PERAWATAN
3
02-04
30-01
13-15
03-05
22-24
19-21
03-05
14-16
04-06
02-04
13-15
27-29
5.950.000
38 39 40 41 42 43
2
48
ADVANCED CCTV Perencanaan, Desain dan Implementasi
3
09-11
06-08
06-08
10-12
10-12
19-21
10-12
09-11
11-13
09-11
06-08
13-15
5.950.000
49 50
INSTRUMENTATION AND CONTROL SYSTEM Scale In Oilfield Water
4 4
24-27 02-05
21-24 30-02
27-30 28-31
25-28 03-06
02-05 08-11
12-15 05-08
25-28 03-06
01-04 07-10
26-29 04-07
24-27 02-05
27-30 28-01
12-15 05-08
7.950.000 7.950.000
51
SIMULASI PROSES TEKNIK KIMIA MENGGUNAKAN HYSYS
4
09-12
06-09
27-02
10-13
15-18
13-16
10-13
21-24
11-14
09-12
30-02
12-15
7.950.000
52
PERHITUNGAN KETIDAKPASTIAN HASIL PENGUKURAN DAN PENGUJIAN
3
16-18
13-15
20-22
17-19
22-24
19-21
17-19
14-16
18-20
16-18
20-22
18-20
5.950.000
53
BASIC FUZZY LOGIC CONTROL AND ITS SIMULATION WITH SPREADSHEET APPLICATION PROGRAM
4
02-05
30-02
06-09
03-06
15-18
12-15
03-06
07-10
04-07
02-05
06-09
04-07
8.500.000
54
APPLICATION STATISTIC IN ENGINEERING INDUSTRY
4
02-05
30-02
20-23
03-06
08-11
06-09
03-06
31-03
04-07
02-05
20-23
05-08
7.950.000
55
CALLIBRATION OF MEASURING TOOL
4
24-27
21-24
07-10
25-28
02-05
13-16
25-28
28-31
26-29
24-27
07-10
04-07
7.950.000
56
CONTROL VALVE OPERATION, MAINTENANCE, AND TROUBLESHOOTING
4
16-19
13-16
28-31
17-20
29-01
05-08
17-20
21-24
18-21
16-19
28-01
05-08
7.950.000
57 58 59 60 61
FINITE ELEMENT METHODS (FEM) Flow Measurement and Control Element INDUSTRIAL METROLOGY Inspeksi dan Korosi MEASUREMENT SYSTEM ANALYSIS
4 4 4 4 4
03-06 09-12 10-13 17-20 03-06
31-03 06-09 07-10 14-17 31-03
28-03 07-10 27-02 06-09 06-09
04-07 10-13 10-13 18-21 04-07
09-12 15-18 16-19 30-02 09-12
06-09 12-15 12-15 05-08 06-09
04-07 10-13 11-14 18-21 04-07
01-04 07-10 08-11 22-25 01-04
05-08 11-14 12-15 19-22 05-08
03-06 09-12 10-13 17-20 03-06
31-03 07-10 30-02 06-09 06-09
05-08 12-15 18-21 05-08 11-14
7.950.000 7.950.000 7.950.000 7.950.000 7.950.000
62
ADVANCE PROCESS CONTROL, INSTRUMENTATION AND METERING
4
23-26
20-23
27-02
24-27
08-11
05-08
24-27
31-03
25-28
23-26
30-02
11-14
8.500.000
63
OLE FOR PROCESS CONTROL (OPC) & DISTRIBUTED COMPONENT OBJECT MODEL (DCOM)
4
02-05
30-02
06-09
03-06
15-18
12-15
03-06
07-10
04-07
02-05
06-09
18-21
8.500.000
64
PROCESS CONTROL AND INSTRUMENTATION
4
09-12
06-09
13-16
10-13
29-01
06-09
10-13
21-24
11-14
09-12
13-16
04-07
8.500.000
65
SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL
4
16-19
13-16
20-23
17-20
02-05
13-16
17-20
28-31
18-21
16-19
20-23
12-15
8.500.000
66
SAFETY RELIEF VALVE FUNDAMENTAL CONCEPTS, SIZING AND SELECTION
4
24-27
21-24
27-30
25-28
09-12
05-08
25-28
01-04
26-29
24-27
27-30
19-22
8.500.000
67
FLUID FLOW MEASUREMENT AND METER PROVING IN OIL AND GAS INDUSTRY
4
24-27
21-24
14-17
25-28
09-12
06-09
25-28
01-04
26-29
24-27
14-17
11-14
7.950.000
68
GPS(Global Positioning System) for mining and Petroleum
4
02-05
30-02
27-30
03-06
02-05
12-15
03-06
28-31
04-07
02-05
27-30
18-21
8.500.000
69 70 71
INDUSTRIAL COMBUSTION AND BURNER WATER TREATMENT LIFE CYCLE COSTING
4 4 3
16-19 16-19 16-18
13-16 13-16 13-15
27-02 20-23 27-01
17-20 17-20 17-19
02-05 08-11 02-04
12-15 13-16 12-14
17-20 17-20 17-19
28-31 07-10 31-02
18-21 18-21 18-20
16-19 16-19 16-18
30-02 20-23 30-01
04-07 19-22 18-20
8.500.000 8.750.000 6.500.000
3
No.
Judul
Durasi
Jan
Feb
Mar
Apr
Mei
Jun
Juli
Aug
Sep
Okt
Nov
Des
Harga
ENGINEERING - MECHANICAL 1
Gas, Oil and Water Pipeline Design and Maintenance
4
17-20
14-17
28-31
18-21
09-12
13-16
18-21
08-11
19-22
17-20
28-01
11-14
8.750.000
2
WELDING SAFETY
2
02-03
30-31
02-03
03-04
02-03
12-13
03-04
28-29
04-05
02-03
02-03
27-28
3.950.000
3
Electric motor Operation, Maintenance & Troubleshooting
4
03-06
31-03
27-30
04-07
02-05
05-08
04-07
01-04
05-08
03-06
27-30
04-07
7.950.000
4 3
23-26 16-18
20-23 13-15
27-30 13-15
24-27 17-19
02-05 22-24
05-08 19-21
24-27 17-19
28-31 14-16
25-28 18-20
23-26 16-18
27-30 13-15
04-07 27-29
7.950.000 6.500.000
5
23-27
20-24
20-24
24-28
29-02
12-16
24-28
21-25
25-29
23-27
20-24
04-08
9.500.000
4 3
02-05 23-25
30-02 20-22
27-30 13-15
03-06 24-26
02-05 15-17
05-08 12-14
03-06 24-26
28-31 14-16
04-07 25-27
02-05 23-25
27-30 13-15
11-14 27-29
8.500.000 6.950.000
4 5 6 7 8
BOILER CONTROL SYSTEMS ENGINEERING PLUMBING SYSTEM AND MAINTENANCE SISTEM KONTROL RHVAC (REFRIGERATION HEATING VENTILATING AND AIR CONDITIONING) REFRIGERATION RETROFIT Pipeline Risk & Integrity Management
9
Piping & Pipeline System Design, Specification, Installation & Maintenance
4
02-05
30-02
20-23
03-06
29-01
05-08
03-06
21-24
04-07
02-05
20-23
04-07
8500000
10
PLANT LIFE MANAGEMENT THROUGH RELIABILITY BASED INSPECTION
5
09-13
06-10
27-31
17-21
08-12
12-16
10-14
31-04
11-15
09-13
27-01
11-15
9.500.000
11 12 13
QC for Water Network (Pipeline) Construction Risk Based Inspection Basic CNC
3 3 3
18-20 04-06 02-04
15-17 01-03 30-01
01-03 15-17 06-08
11-13 05-07 03-05
22-24 17-19 08-10
19-21 07-09 05-07
19-21 05-07 03-05
28-30 14-16 07-09
20-22 06-08 04-06
18-20 04-06 02-04
01-03 15-17 06-08
20-22 06-08 04-06
6.950.000 6.950.000 7.250.000
14
COMPRESSOR OPERATION, MAINTENANCE, TROUBLESHOOTING AND DIAGNOSTIC OF FAILURE ANALYSIS
4
09-12
06-09
13-16
10-13
15-18
12-15
10-13
21-24
11-14
09-12
13-16
11-14
7.950.000
15 16
MACHINERY FLUID MECHANICS PELUMAS DAN SISTEM PELUMASAN
4 4
16-19 23-26
13-16 20-23
20-23 27-30
17-20 24-27
29-01 02-05
05-08 13-16
17-20 24-27
28-31 31-03
18-21 25-28
16-19 23-26
20-23 27-30
18-21 04-07
7.950.000 7.950.000
17
ELECTRIC CHARGING SYSTEM AND STARTING SYSTEM OF HEAVY DUTY EQUIPMENT
4
09-12
06-09
06-09
10-13
15-18
12-15
10-13
21-24
11-14
09-12
06-09
18-21
7.950.000
18
ELECTRO-PNEUMATICS SYSTEM PRINCIPLES AND APPLICATION
4
16-19
13-16
13-16
17-20
29-01
05-08
17-20
28-31
18-21
16-19
13-16
04-07
7.950.000
19 20 21 22 23 24 25 26 27
INSTRUMENTATION AND CONTROL SYSTEM KONTROL ELEKTRIK MECHATRONICS APPLICATION IN INDUSTRY Mekatronika PNEUMATIC SYSTEM AND APPLICATION PROGRAMMABLE LOGIC CONTROLLER (PLC) REKAYASA ELEKTRO HIDROLIK AND APLIKASI REKAYASA HIDROLIK AND APLIKASI INSTRUMENTATION AND BASIC CONTROL
4 4 4 4 4 4 4 4 3
23-26 02-05 10-13 17-20 24-27 03-06 09-12 16-19 23-25
20-23 30-02 07-10 14-17 21-24 31-03 06-09 13-16 20-22
20-23 27-30 27-02 07-10 14-17 21-24 28-31 28-03 06-08
24-27 03-06 10-13 18-21 25-28 04-07 10-13 17-20 24-26
02-05 08-11 16-19 30-02 02-05 09-12 15-18 29-01 22-24
13-16 06-09 12-15 05-08 13-16 06-09 12-15 05-08 19-21
24-27 03-06 11-14 18-21 25-28 04-07 10-13 17-20 24-26
31-03 07-10 22-25 28-31 01-04 08-11 21-24 28-31 14-16
25-28 04-07 12-15 19-22 26-29 05-08 11-14 18-21 25-27
23-26 02-05 10-13 17-20 24-27 03-06 09-12 16-19 23-25
20-23 27-30 30-02 07-10 14-17 21-24 28-01 31-03 06-08
11-14 19-22 05-08 12-15 18-21 04-07 11-14 19-22 27-29
7.950.000 7.950.000 7.950.000 7.950.000 7.950.000 7.950.000 7.950.000 7.950.000 5.950.000
4
SYSTEM 28 29 30 31 32 33 34 35
BELT CONVEYOR OPERATION & MAINTENANCE MANAJEMEN MATERIAL Manajemen Perbengkelan PENGETAHUAN MATERIAL HANDLING & APLIKASI AC & REFRIGERATION PRINCIPLES, OPERATION AND TROUBLESHOOTING ADVANCED VIBRATION MONITORING TECHNIQUE BEARING TECHNOLOGY AND LUBRICATION SYSTEM CENTRIFUGAL GAS COMPRESSOR Anti Surge Control
4 4 4
02-05 16-19 23-26
30-02 13-16 20-23
27-30 06-09 13-16
03-06 17-20 24-27
29-01 08-11 15-18
12-15 13-16 06-09
03-06 17-20 24-27
28-31 07-10 21-24
04-07 18-21 25-28
02-05 16-19 23-26
27-30 06-09 13-16
04-07 18-21 05-08
7.950.000 7.950.000 7.950.000
4
03-06
31-03
20-23
04-07
30-02
12-15
04-07
28-31
05-08
03-06
20-23
12-15
7.950.000
4
02-05
30-02
27-30
03-06
02-05
05-08
03-06
31-03
04-07
02-05
27-30
11-14
7.950.000
4
16-19
13-16
06-09
17-20
15-18
06-09
17-20
21-24
18-21
16-19
06-09
04-07
7.950.000
4
24-27
21-24
07-10
25-28
30-02
13-16
25-28
28-31
26-29
24-27
07-10
18-21
7.950.000
4
16-19
13-16
27-30
17-20
15-18
06-09
17-20
21-24
18-21
16-19
27-30
19-22
7.950.000
36
CENTRIFUGAL GAS COMPRESSOR OPERATION & MAINTENANCE
4
23-26
20-23
27-02
24-27
29-01
13-16
24-27
28-31
25-28
23-26
30-02
05-08
7.950.000
37
CENTRIFUGAL PUMP OPERATION AND MAINTENANCE
4
03-06
31-03
06-09
04-07
02-05
05-08
04-07
01-04
05-08
03-06
06-09
11-14
7.950.000
4
24-27
21-24
28-31
25-28
30-02
13-16
25-28
28-31
26-29
24-27
28-01
12-15
7.950.000
4
16-19
13-16
14-17
17-20
15-18
06-09
17-20
21-24
18-21
16-19
14-17
11-14
7.950.000
4
09-12
06-09
28-31
10-13
08-11
12-15
10-13
07-10
11-14
09-12
28-01
18-21
7.950.000
38 39 40
COLD STORAGE PRINCIPLE, OPERATION & TROUBLESHOOTING DIESEL ENGINES OPERATION AND MAINTENANCE GAS TURBINE OPERATION, PERFORMANCE & TROUBLESHOOTING
41
HYDRAULICS SYSTEMS Engineering Applications
4
03-06
31-03
14-17
04-07
02-05
05-08
04-07
01-04
05-08
03-06
14-17
19-22
7.950.000
42
HYDRAULICS SYSTEMS MAINTENANCE & TROUBLESHOOTING
4
10-13
07-10
21-24
10-13
09-12
12-15
11-14
08-11
12-15
10-13
21-24
05-08
7.950.000
43 44 45
MATERIAL ATTITUDE USES AND PROBLEMS MATERIAL IDENTIFICATION METALLURGY FOR NON METALLURGIST
4 4 4
03-06 10-13 24-27
31-03 07-10 21-24
28-03 07-10 21-24
04-07 10-13 25-28
02-05 09-12 30-02
05-08 12-15 13-16
04-07 11-14 25-28
01-04 08-11 28-31
05-08 12-15 26-29
03-06 10-13 24-27
31-03 07-10 21-24
11-14 18-21 12-15
7.950.000 7.950.000 7.950.000
46
MOTOR CONTROL CENTER OPERATION & MAINTENANCE
4
02-05
30-02
27-30
03-06
02-05
05-08
03-06
31-03
04-07
02-05
27-30
19-22
7.950.000
47
OPERATING AND MAINTENANCE OF HEAVY DUTY EQUIPMENTS
4
16-19
13-16
06-09
17-20
15-18
06-09
17-20
21-24
18-21
16-19
06-09
11-14
7.950.000
48
PIPING SYSTEM MATERIAL DESIGN AND MAINTENANCE
4
10-13
07-10
28-31
10-13
09-12
12-15
11-14
08-11
12-15
10-13
28-01
12-15
7.950.000
49 50 51 52
PRACTICAL WELDING PRACTICE CONSIDERATIONS OF ARC WELDING ROTOR BALANCING AND SHAFT ALIGNMENT Welding
4 4 4 4
09-12 16-19 10-13 17-20
06-09 13-16 07-10 14-17
21-24 27-30 13-16 06-09
10-13 17-20 10-13 18-21
08-11 15-18 09-12 16-19
12-15 06-09 12-15 06-09
10-13 17-20 11-14 18-21
07-10 21-24 08-11 22-25
11-14 18-21 12-15 19-22
09-12 16-19 10-13 17-20
21-24 27-30 13-16 06-09
18-21 04-07 05-08 04-07
7.950.000 7.950.000 7.950.000 7.950.000
5
53 54 55 56 57 58 59 60
Welding Joint Inspection Welding Metallurgy Welding Oxy Acetylene MANAJEMEN BENGKEL THERMAL SPRAY COATING MATERIAL HANDLING & PACKAGING AEROENGINE BEARING INSPECTION AIR COMPRESSOR
4 4 4 4 4 4 3 3
24-27 02-05 09-12 02-05 09-12 23-26 16-18 23-25
21-24 30-02 06-09 30-02 06-09 20-23 13-15 20-22
13-16 20-23 28-31 13-16 13-16 20-23 06-08 13-15
25-28 03-06 10-13 03-06 10-13 24-27 17-19 24-26
30-02 02-05 08-11 02-05 02-05 02-05 22-24 22-24
13-16 05-08 12-15 05-08 05-08 05-08 19-21 19-21
25-28 03-06 10-13 03-06 10-13 24-27 17-19 24-26
28-31 31-03 07-10 31-03 31-03 31-03 14-16 14-16
26-29 04-07 11-14 04-07 11-14 25-28 18-20 25-27
24-27 02-05 09-12 02-05 09-12 23-26 16-18 23-25
13-16 20-23 28-01 13-16 13-16 20-23 06-08 13-15
12-15 19-22 05-08 04-07 11-14 18-21 27-29 27-29
7.950.000 7.950.000 7.950.000 7.950.000 8.500.000 7.950.000 6.500.000 5.950.000
61
ALIGNMENT AND BALANCING IN ROTATING EQUIPMENT
3
02-04
30-01
20-22
03-05
22-24
19-21
03-05
14-16
04-06
02-04
20-22
27-29
5.950.000
62
BEARING LUBRICATION TECHNOLOGY
4
09-12
06-09
27-30
10-13
08-11
12-15
10-13
07-10
11-14
09-12
27-30
04-07
7.950.000
63
Compressor and Prime Mover Operation & Maintenance
3
25-27
22-24
08-10
26-28
22-24
19-21
26-28
14-16
27-29
25-27
08-10
27-29
6.500.000
64 65
GAS TURBINE OPERATION & MAINTENANCE Machinery Diagnostic
4 4
10-13 16-19
07-10 13-16
21-24 28-31
10-13 17-20
29-01 02-05
13-16 06-09
11-14 17-20
28-31 31-03
12-15 18-21
10-13 16-19
21-24 28-01
18-21 05-08
7.950.000 7.950.000
3
23-25
20-22
01-03
24-26
22-24
19-21
24-26
14-16
25-27
23-25
01-03
27-29
6.500.000
3
02-04
30-01
06-08
03-05
22-24
19-21
03-05
14-16
04-06
02-04
06-08
27-29
5.950.000
3
11-13
08-10
08-10
11-13
22-24
19-21
12-14
14-16
13-15
11-13
08-10
27-29
6.500.000
66 67 68
MANAGING THE INTEGRITY OF GAS PIPELINE SYSTEM PIPELINE PIGGING OPERATIONS AND EQUIPMENT Vibration Monitoring & Control System
69
MANAJEMEN POST WELD HEAT TREATMENT TEORI, STANDARD PROSEDUR DAN APLIKASI
3
09-11
06-08
27-01
10-12
02-04
19-21
10-12
31-02
11-13
09-11
30-01
11-13
6.500.000
70
MATERIAL CERTIFICATION REQUIREMENT FOR OIL AND GAS INDUSTRY
3
23-25
20-22
13-15
24-26
15-17
12-14
24-26
14-16
25-27
23-25
13-15
27-29
6.500.000
71
PROTECTIVE COATING TECHNOLOGY FOR CORROSION CONTROL
3
04-06
01-03
20-22
05-07
22-24
19-21
05-07
21-23
06-08
04-06
20-22
04-06
6.500.000
72 73 74
ROTATING EQUIPMENTS ANALISIS VIBRASI PIPING SYSTEM
3 4 4
18-20 09-12 16-19
15-17 06-09 13-16
29-31 13-16 20-23
19-21 10-13 17-20
31-02 15-18 29-01
19-21 12-15 05-08
19-21 10-13 17-20
29-31 21-24 28-31
20-22 11-14 18-21
18-20 09-12 16-19
29-01 13-16 20-23
20-22 11-14 18-21
6.500.000 8.500.000 8.500.000
75
MOTOR DIESEL PRINSIP DASAR, OPERASI DAN PERAWATAN
4
09-12
06-09
06-09
10-13
08-11
05-08
10-13
07-10
11-14
09-12
06-09
11-14
7.950.000
76 77 78 79 80
PELUMASAN MESIN PEMBANGKIT UAP (BOILER) PENGGERAK MULA (PRIME MOVER) TURBIN GAS TURBIN UAP
4 4 4 4 4
16-19 23-26 02-05 10-13 17-20
13-16 20-23 30-02 07-10 14-17
13-16 20-23 27-30 27-02 07-10
17-20 24-27 03-06 10-13 18-21
15-18 29-01 02-05 09-12 16-19
12-15 06-09 13-16 05-08 12-15
17-20 24-27 03-06 11-14 18-21
21-24 28-31 31-03 08-11 22-25
18-21 25-28 04-07 12-15 19-22
16-19 23-26 02-05 10-13 17-20
13-16 20-23 27-30 30-02 07-10
18-21 04-07 12-15 19-22 05-08
7.950.000 7.950.000 7.950.000 7.950.000 7.950.000
81
PIPELINE INTERNAL CORROSION CONTROL AND MONITORING
4
09-12
06-09
13-16
10-13
02-05
06-09
10-13
31-03
11-14
09-12
13-16
12-15
8.750.000
82
Chiller and Cooling Tower Design and Operation
3
23-25
20-22
27-29
24-26
22-24
19-21
24-26
14-16
25-27
23-25
27-29
27-29
6.500.000
6
83
DESIGN OF HEATING, VENTILATION AND AIR CONDITIONING SYSTEM
5
02-06
30-03
27-03
03-07
15-19
05-09
03-07
21-25
04-08
02-06
30-03
04-08
9.500.000
84
HVAC SYSTEM Operation & Maintenance
4
09-12
06-09
06-09
10-13
29-01
12-15
10-13
28-31
11-14
09-12
06-09
11-14
8.500.000
85
PETROLEUM INDUSTRIAL REFRIGERATION OPERATION AND MAINTENANCE
4
16-19
13-16
13-16
17-20
02-05
05-08
17-20
31-03
18-21
16-19
13-16
18-21
8.500.000
86
Practical and Advanced Course on HVAC Systems
4
24-27
21-24
20-23
25-28
08-11
13-16
25-28
07-10
26-29
24-27
20-23
04-07
8.500.000
87
CENTRIFUGAL PUMP Selection, Operation, and Maintenance
5
02-06
30-03
27-31
03-07
15-19
05-09
03-07
21-25
04-08
02-06
27-01
11-15
9.500.000
88
Gas Compressor Operation, Maintenance & Troubleshooting
4
09-12
06-09
27-02
10-13
29-01
12-15
10-13
28-31
11-14
09-12
30-02
18-21
8.500.000
89
Hydraulics Power System
5
16-20
13-17
06-10
17-21
08-12
05-09
17-21
31-04
18-22
16-20
06-10
04-08
9.500.000
90
KOMPRESOR SENTRIFUGAL OPERASI, PEMELIHARAAN, DAN TROUBLESHOOTING
4
23-26
20-23
13-16
24-27
02-05
13-16
24-27
07-10
25-28
23-26
13-16
11-14
8.500.000
91
PUMP AND COMPRESSOR OPERATION, MAINTENANCE & TROUBLESHOOTING
5
02-06
30-03
20-24
03-07
15-19
05-09
03-07
21-25
04-08
02-06
20-24
18-22
9.500.000
92 93 94 95
SISTEM HIDROLIK DAN PNEUMATIK NON DESTRUCTIVE TEST(NDT) ASME PTC 4 – 1 BASIC GAS ENGINE
4 4 4 4
10-13 09-12 23-26 02-05
07-10 06-09 20-23 30-02
27-30 13-16 27-30 27-02
10-13 10-13 24-27 03-06
30-02 15-18 29-01 02-05
12-15 05-08 12-15 05-08
11-14 10-13 24-27 03-06
28-31 21-24 28-31 31-03
12-15 11-14 25-28 04-07
10-13 09-12 23-26 02-05
27-30 13-16 27-30 30-02
04-07 11-14 04-07 11-14
8.500.000 7.950.000 7.950.000 7.950.000
96
Belt Conveyor Technology, Design Cacilation and Troubleshooting
4
09-12
06-09
06-09
10-13
08-11
13-16
10-13
07-10
11-14
09-12
06-09
18-21
7.950.000
97
BOILER OPERATION, MAINTENANCE & TROUBLESHOOTING
4
16-19
13-16
13-16
17-20
15-18
06-09
17-20
21-24
18-21
16-19
13-16
05-08
7.950.000
98
COAL FIRED POWER PLANT COMBUSTION OPERATION & MAINTENANCE
4
24-27
21-24
20-23
25-28
30-02
12-15
25-28
28-31
26-29
24-27
20-23
12-15
7.950.000
4 4
03-06 10-13
31-03 07-10
28-31 28-03
04-07 10-13
02-05 09-12
05-08 13-16
04-07 11-14
01-04 08-11
05-08 12-15
03-06 10-13
28-01 31-03
19-22 04-07
7.950.000 7.950.000
99 100
DIESEL ENGINE OPERATION AND MAINTENANCE DIESEL GUNSET OPERATION AND MAINTENANCE
101
GAS TURBINE OPERATION, MAINTENANCE AND TROUBLESHOOTING
4
17-20
14-17
07-10
18-21
16-19
06-09
18-21
22-25
19-22
17-20
07-10
11-14
7.950.000
102
OPERATION & MAINTENANCE OF BOILER
4
23-26
20-23
14-17
24-27
29-01
12-15
24-27
28-31
25-28
23-26
14-17
18-21
7.950.000
103
OPERATION, MAINTENANCE AND TROUBLESHOOTING OF GAS TURBINE
4
02-05
30-02
21-24
03-06
02-05
05-08
03-06
31-03
04-07
02-05
21-24
05-08
7950000
104
Perawatan Belt Conveyor
3
09-11
06-08
27-29
10-12
22-24
19-21
10-12
14-16
11-13
09-11
27-29
27-29
5.950.000
105
STEAM GENERATOR AND TURBINE OPERATION AND MAINTENANCE
4
16-19
13-16
27-02
17-20
08-11
13-16
17-20
07-10
18-21
16-19
30-02
12-15
7.950.000
106
TRANSMISI DAYA MEKANIK (MECHANICAL POWER TRANSMISSION)
4
03-06
31-03
13-16
04-07
30-02
12-15
04-07
28-31
05-08
03-06
13-16
04-07
7.950.000
107
VALVE
4
10-13
07-10
20-23
10-13
02-05
05-08
11-14
01-04
12-15
10-13
20-23
11-14
7.950.000
108
Turbomachinery Operation, Maintenance and Troubleshooting
4
17-20
14-17
28-31
18-21
09-12
13-16
18-21
08-11
19-22
17-20
28-01
18-21
7.950.000
7
109 110 111
PRESSURE VESSEL DESIGN, OPERATION & MAINTENANCE ALIGNMENT AND VIBRATION INSPECTION SYSTEM AUTOMOTIVE (CARS) AIR CONDITIONING (AC) SYSTEM
4
23-26
20-23
28-03
24-27
16-19
06-09
24-27
22-25
25-28
23-26
31-03
05-08
7.950.000
4
16-19
13-16
20-23
17-20
29-01
12-15
17-20
21-24
18-21
16-19
20-23
18-21
7.950.000
4
23-26
20-23
27-30
24-27
02-05
05-08
24-27
28-31
25-28
23-26
27-30
04-07
7.950.000
112
BOILER (KETEL UAP) DAN TURBIN UAP OPERASI, PERAWATAN DAN TROUBLESHOOTING
4
02-05
30-02
27-02
03-06
08-11
13-16
03-06
31-03
04-07
02-05
30-02
11-14
7.950.000
113
POMPA DAN KOMPRESOR OPERASI, PERAWATAN DAN TROUBLESHOOTING
4
24-27
21-24
21-24
25-28
02-05
05-08
25-28
28-31
26-29
24-27
21-24
12-15
7.950.000
114
Pump Operation, Maintenance & Troubleshooting
4
10-13
07-10
28-03
10-13
16-19
06-09
11-14
08-11
12-15
10-13
31-03
04-07
7.950.000
4
16-19
13-16
27-02
17-20
29-01
12-15
17-20
21-24
18-21
16-19
30-02
18-21
7.950.000
3
09-11
06-08
13-15
10-12
15-17
05-07
10-12
14-16
11-13
09-11
13-15
11-13
5950000
3
16-18
13-15
20-22
17-19
22-24
12-14
17-19
21-23
18-20
16-18
20-22
18-20
5.950.000
4
02-05
30-02
27-02
03-06
02-05
12-15
03-06
31-03
04-07
02-05
30-02
11-14
8.500.000
115 116 117 118
OPERATION AND MAINTENANCE OF HEAVY DUTY EQUIPMENT ALIGNMENT, LEVELLING AND ROTOR BALANCING BEARING AND OIL LUBRICATION FOR MACHINERY BOILER OPERATION, MAINTENANCE & TROUBLESHOOTING
119
COMPRESSOR Operation, Maintenance and Troubleshooting
3
09-11
06-08
06-08
10-12
08-10
19-21
10-12
07-09
11-13
09-11
06-08
27-29
6.750.000
120
GAS AND STEAM TURBINE Operation, Maintenance And Troubleshooting
4
16-19
13-16
13-16
17-20
15-18
05-08
17-20
21-24
18-21
16-19
13-16
18-21
8.500.000
121
GAS TURBINE PRINCIPLES, INSPECTION, OPERATION, MAINTENANCE AND TROUBLESHOOTING
4
23-26
20-23
20-23
24-27
29-01
13-16
24-27
28-31
25-28
23-26
20-23
04-07
8.500.000
122
HEAT EXCHANGERS Operation, maintenance and troubleshooting
4
03-06
31-03
27-30
04-07
02-05
06-09
04-07
01-04
05-08
03-06
27-30
12-15
8.500.000
123
HIGH PRESSURE PUMP (HPP) OPERATION, MAINTENANCE AND TROUBLESHOOTING
4
10-13
07-10
28-03
10-13
09-12
12-15
11-14
08-11
12-15
10-13
31-03
19-22
8.500.000
124 125
Lubrication and Bearing Technology LUBRIKASI Prinsip Dasar dan Aplikasi
4 3
17-20 25-27
14-17 22-24
07-10 15-17
18-21 26-28
16-19 22-24
05-08 19-21
18-21 26-28
22-25 14-16
19-22 27-29
17-20 25-27
07-10 15-17
05-08 27-29
8.500.000 6.500.000
126
OIL FILM BEARING (JOURNAL DAN THRUST BEARING HYDRODYNAMIC BEARINGS)
4
02-05
30-02
21-24
03-06
30-02
13-16
03-06
28-31
04-07
02-05
21-24
11-14
8.500.000
127
PIPELINE Design, Testing, Inspection And Maintenance
4
09-12
06-09
28-31
10-13
02-05
06-09
10-13
31-03
11-14
09-12
28-01
18-21
8.500.000
128
Pressure Vessel Calculation, Codes, Production, Operation, Control & Safeties
4
16-19
13-16
27-02
17-20
08-11
12-15
17-20
07-10
18-21
16-19
30-02
04-07
8.500.000
8
129
PUMP OPERATION, MAINTENANCE AND TROUBLESHOOTING
4
23-26
20-23
06-09
24-27
15-18
05-08
24-27
21-24
25-28
23-26
06-09
12-15
8.500.000
130
PUMP AND COMPRESSOR OPERATION, MAINTENANCE AND TROUBLESHOOTING
4
03-06
31-03
13-16
04-07
29-01
13-16
04-07
28-31
05-08
03-06
13-16
19-22
8.500.000
131
Refractory and Heat Insulation
4
10-13
07-10
20-23
10-13
02-05
06-09
11-14
01-04
12-15
10-13
20-23
05-08
8.500.000
132
REFRIGERATION OPERATION, MAINTENANCE AND TROUBLESHOOTING
4
17-20
14-17
27-30
18-21
09-12
12-15
18-21
08-11
19-22
17-20
27-30
11-14
8.500.000
133
ROTATING EQUIPMENT
4
24-27
21-24
28-03
25-28
16-19
05-08
25-28
22-25
26-29
24-27
31-03
18-21
8.500.000
134
STEAM TURBINE OPERATION, MAINTENANCE AND TROUBLESHOOTING
4
02-05
30-02
07-10
03-06
30-02
13-16
03-06
28-31
04-07
02-05
07-10
04-07
8.500.000
135 136
ELECTROPLATING FAILURE ANALYSIS METHODS AND CASES
4 4
23-26 02-05
20-23 30-02
20-23 27-30
24-27 03-06
29-01 02-05
05-08 12-15
24-27 03-06
21-24 28-31
25-28 04-07
23-26 02-05
20-23 27-30
04-07 11-14
9.250.000 7.950.000
137
PROSES PENGERJAAN AKHIR DENGAN PELAPIS LOGAM (ELECTROPLATING)
4
09-12
06-09
27-02
10-13
08-11
06-09
10-13
31-03
11-14
09-12
30-02
18-21
9.250.000
138
ALAT PENUKAR KALOR (HEAT EXCHANGER) OPERASI DAN PERAWATAN
4
16-19
13-16
06-09
17-20
29-01
05-08
17-20
21-24
18-21
16-19
06-09
11-14
7.950.000
139
ANALISIS DAN PENGUKURAN GETARAN MEKANIK (ANALYSIS AND MEASURING OF VIBRATION MACHINERY)
4
23-26
20-23
13-16
24-27
02-05
13-16
24-27
28-31
25-28
23-26
13-16
18-21
7.950.000
4
10-13
07-10
27-30
10-13
16-19
12-15
11-14
08-11
12-15
10-13
27-30
12-15
7.950.000
4
03-06
31-03
14-17
04-07
09-12
06-09
04-07
01-04
05-08
03-06
14-17
11-14
7.950.000
4
23-26
20-23
27-02
24-27
02-05
13-16
24-27
28-31
25-28
23-26
30-02
12-15
7.950.000
140 141 142
BEARING AND OIL LUBRICATION FOR MACHINERY COATING SYSTEM AND PROTECTION CORROSION CONVEYOR OPERASI DAN PERAWATAN
143
DISAIN ALAT BANTU CEKAM DAN PEGANG (DESIGN OF JIGS AND FIXTURES)
4
02-05
30-02
06-09
03-06
08-11
06-09
03-06
31-03
04-07
02-05
06-09
19-22
7.950.000
144
DISAIN ALAT PENEKAN DAN PEMBENTUK
4
10-13
07-10
13-16
10-13
16-19
12-15
11-14
08-11
12-15
10-13
13-16
04-07
7.950.000
145
DISAIN KONSTRUKSI MESIN DAN PERALATAN INDUSTRI
4
17-20
14-17
20-23
18-21
30-02
05-08
18-21
22-25
19-22
17-20
20-23
11-14
7.950.000
146 147 148 149
DYNAMIC OF MACHINE TOOLS HAND TOOL UTILIZATION HEAVY DUTY EQUIPMENT HYDRAULIC CONTROL SYSTEM
4 4 4 4
24-27 16-19 23-26 02-05
21-24 13-16 20-23 30-02
27-30 14-17 21-24 28-31
25-28 17-20 24-27 03-06
02-05 29-01 02-05 08-11
13-16 05-08 13-16 06-09
25-28 17-20 24-27 03-06
28-31 21-24 28-31 31-03
26-29 18-21 25-28 04-07
24-27 16-19 23-26 02-05
27-30 14-17 21-24 28-01
18-21 19-22 04-07 11-14
7.950.000 7.950.000 7.950.000 7.950.000
150
KINEMATIKA DAN DINAMIKA MESIN (KINEMATICS AND DYNAMICS OF MACHINERIES)
4
03-06
31-03
20-23
04-07
09-12
06-09
04-07
01-04
05-08
03-06
20-23
19-22
7.950.000
151
MACHINERY NOISE AND PROBLEM SOLVING
4
09-12
06-09
27-30
10-13
15-18
12-15
10-13
07-10
11-14
09-12
27-30
04-07
7.950.000
152
MANUFACTURING PROCESS TO USE CNC MACHINING
4
10-13
07-10
21-24
10-13
16-19
12-15
11-14
08-11
12-15
10-13
21-24
12-15
7.950.000
153
MANUFACTURING PROCESSES TO USE CASTING
4
17-20
14-17
28-31
18-21
30-02
05-08
18-21
22-25
19-22
17-20
28-01
19-22
7.950.000
9
154
MANUFACTURING PROCESSES TO USE METAL FORMING
4
24-27
21-24
27-02
25-28
02-05
13-16
25-28
28-31
26-29
24-27
30-02
04-07
7.950.000
155
MEASUREMENT TECHNIQUE FOR MAINTENANCE AND OPERATION LATHE MACHINE
4
09-12
06-09
13-16
10-13
15-18
12-15
10-13
07-10
11-14
09-12
13-16
18-21
7.950.000
156 157
NON DESTRUCTIVE TEST OXY ACETYLENE WELDING
4 4
23-26 17-20
20-23 14-17
27-30 14-17
24-27 18-21
02-05 30-02
13-16 05-08
24-27 18-21
28-31 22-25
25-28 19-22
23-26 17-20
27-30 14-17
12-15 11-14
7.950.000 8.500.000
158
PEMILIHAN MATERIAL KOMPONEN MESIN (MATERIAL SELECTION)
4
24-27
21-24
21-24
25-28
02-05
13-16
25-28
28-31
26-29
24-27
21-24
18-21
7.950.000
159
PENGEMBANGAN TEKNOLOGI DAN STANDAR MATERIAL
4
03-06
31-03
28-31
04-07
09-12
06-09
04-07
01-04
05-08
03-06
28-01
05-08
7.950.000
160
PENGUJIAN MATERIAL BERSIFAT MERUSAK (DESTRUCTIVE TEST)
4
09-12
06-09
27-02
10-13
15-18
12-15
10-13
07-10
11-14
09-12
30-02
12-15
7.950.000
161
PERLAKUAN PANAS LOGAM (HEAT TREATMENT FOR METAL)
4
02-05
30-02
20-23
03-06
08-11
06-09
03-06
31-03
04-07
02-05
20-23
11-14
7.950.000
162 163 164 165 166 167
PNEUMATIC CONTROL SYSTEM PRODUCTION OF HELICAL GEAR PROSES PEMESINAN (MACHINING) PUMP OPERATION AND MAINTENANCE SISTEM PEMIPAAN (PIPING) TESTING OF MACHINE TOOLS
4 4 4 4 4 4
10-13 16-19 10-13 17-20 16-19 17-20
07-10 13-16 07-10 14-17 13-16 14-17
27-30 28-31 13-16 20-23 14-17 06-09
10-13 17-20 10-13 18-21 17-20 18-21
16-19 29-01 16-19 30-02 29-01 30-02
12-15 05-08 12-15 05-08 05-08 05-08
11-14 17-20 11-14 18-21 17-20 18-21
08-11 21-24 08-11 22-25 21-24 22-25
12-15 18-21 12-15 19-22 18-21 19-22
10-13 16-19 10-13 17-20 16-19 17-20
27-30 28-01 13-16 20-23 14-17 06-09
18-21 11-14 12-15 19-22 05-08 11-14
7.950.000 7.950.000 7.950.000 7.950.000 7.950.000 7.950.000
168
Transmisi Daya Mekanik (Mechanical Power Transmission)
4
03-06
31-03
20-23
04-07
09-12
06-09
04-07
01-04
05-08
03-06
20-23
05-08
7.950.000
169
TROUBLE SHOOTING, INSPECTION, AND MONITORING OF MACHINERY
4
09-12
06-09
27-30
10-13
15-18
12-15
10-13
07-10
11-14
09-12
27-30
12-15
7.950.000
170 171 172 173 174 175 176 177 178
BASIC WELDING GAS METAL ARC WELDING (LAS MIGMAG) GAS TUNGSTEN ARC WELDING (LAS TIG) MANUAL METAL ARC WELDING (LAS LISTRIK) OXY ACETYLENE WELDING (LAS ASETILIN) WELDING INSPECTION WELDING METALLURGY WELDING SAFETY WELDING TECHNOLOGY
4 4 4 4 4 4 4 3 4
23-26 02-05 09-12 16-19 24-27 03-06 10-13 18-20 23-26
20-23 30-02 06-09 13-16 21-24 31-03 07-10 15-17 20-23
20-23 27-30 27-02 06-09 13-16 21-24 28-31 01-03 07-10
24-27 03-06 10-13 17-20 25-28 04-07 10-13 19-21 24-27
29-01 02-05 08-11 15-18 30-02 02-05 09-12 22-24 16-19
12-15 05-08 13-16 06-09 12-15 05-08 13-16 19-21 06-09
24-27 03-06 10-13 17-20 25-28 04-07 11-14 19-21 24-27
21-24 28-31 31-03 07-10 22-25 28-31 01-04 14-16 08-11
25-28 04-07 11-14 18-21 26-29 05-08 12-15 20-22 25-28
23-26 02-05 09-12 16-19 24-27 03-06 10-13 18-20 23-26
20-23 27-30 30-02 06-09 13-16 21-24 28-01 01-03 07-10
04-07 11-14 18-21 05-08 12-15 19-22 04-07 27-29 11-14
8.950.000 8.950.000 8.950.000 8.950.000 8.950.000 9.500.000 8.950.000 6.950.000 8.950.000
179
ANALISIS GETARAN DALAM PERAWATAN ROTARY EQUIPMENT
4
02-05
30-02
27-02
03-06
15-18
12-15
03-06
07-10
04-07
02-05
30-02
04-07
7.950.000
180 181 182
BENGKEL ALAT BERAT BOILER WATER TREATMENT CENTRIFUGAL COMPRESSOR
4 4 4
09-12 16-19 23-26
06-09 13-16 20-23
06-09 13-16 20-23
10-13 17-20 24-27
29-01 02-05 08-11
05-08 13-16 06-09
10-13 17-20 24-27
21-24 28-31 31-03
11-14 18-21 25-28
09-12 16-19 23-26
06-09 13-16 20-23
11-14 18-21 05-08
7.950.000 7.950.000 7.950.000
10
183
CENTRIFUGAL COMPRESSOR & STEAM TURBINE PERFORMANCE
4
03-06
31-03
27-30
04-07
16-19
12-15
04-07
08-11
05-08
03-06
27-30
12-15
7.950.000
184 185 186
CENTRIFUGAL PUMP AND SEAL CORROSION AND CATHODIC PROTECTION HEAVY EQUIPMENT MANAGEMENT
4 4 4
10-13 17-20 02-05
07-10 14-17 30-02
28-03 07-10 21-24
10-13 18-21 03-06
30-02 02-05 15-18
05-08 13-16 12-15
11-14 18-21 03-06
22-25 28-31 07-10
12-15 19-22 04-07
10-13 17-20 02-05
31-03 07-10 21-24
19-22 04-07 18-21
7.950.000 7.950.000 7.950.000
187
HYDRAULIC PNEUMATIC & ELECTRIC CONTROL SYSTEM
4
09-12
06-09
28-31
10-13
29-01
05-08
10-13
21-24
11-14
09-12
28-01
05-08
7.950.000
188
NON DESTRUCTIVE TESTING (NDT)
4
16-19
13-16
27-02
17-20
02-05
13-16
17-20
28-31
18-21
16-19
30-02
12-15
7.950.000
189
OPERASI DAN PEMELIHARAAN TURBIN GAS DAN GENERATOR
4
23-26
20-23
06-09
24-27
08-11
06-09
24-27
31-03
25-28
23-26
06-09
19-22
7.950.000
190 191 192 193 194 195 196
POMPA OPERASI DAN PERAWATAN ROTATING EQUIPMENTS TURBIN & GENERATOR OPERATION VALVE (CHOKE & CONTROL VALVE) WELDING INSPECTION LIQUID PENETRANT TESTING MAGNETIC PARTICLE TESTING
4 4 4 4 4 5 5
03-06 24-27 16-19 23-26 03-06 16-20 23-27
31-03 21-24 13-16 20-23 31-03 13-17 20-24
13-16 28-03 21-24 28-31 27-02 06-10 13-17
04-07 25-28 17-20 24-27 04-07 17-21 24-28
16-19 09-12 02-05 08-11 16-19 08-12 15-19
12-15 06-09 13-16 06-09 12-15 05-09 12-16
04-07 25-28 17-20 24-27 04-07 17-21 24-28
08-11 01-04 28-31 31-03 08-11 31-04 07-11
05-08 26-29 18-21 25-28 05-08 18-22 25-29
03-06 24-27 16-19 23-26 03-06 16-20 23-27
13-16 31-03 21-24 28-01 30-02 06-10 13-17
04-07 05-08 04-07 11-14 18-21 04-08 11-15
7.950.000 7.950.000 7.950.000 7.950.000 7.950.000 11.500.000 11.500.000
197
PENGENDALIAN MOTOR LISTRIK SECARA ELEKTRONIK
4
23-26
20-23
13-16
24-27
29-01
13-16
24-27
28-31
25-28
23-26
13-16
18-21
7.950.000
4 4
09-12 02-05
06-09 30-02
06-09 07-10
10-13 03-06
15-18 15-18
06-09 12-15
10-13 03-06
07-10 07-10
11-14 04-07
09-12 02-05
06-09 07-10
19-22 12-15
7.950.000 7.950.000
198 199
GENSET TEKNOLOGI, PERAWATAN DAN OPERASI
SISTEM KONTROL MOTOR LISTRIK
200
TRAFO PRINCIPLES, APPLICATION AND MAINTENANCE
4
09-12
06-09
14-17
10-13
29-01
05-08
10-13
21-24
11-14
09-12
14-17
19-22
7.950.000
201
ENGINEERING MATERIAL KNOWLEDGE FOR WAREHOUSE PEOPLE
3
02-04
30-01
27-29
03-05
22-24
19-21
03-05
28-30
04-06
02-04
27-29
27-29
6.500.000
202
PETROLEUM PLANT & PIPELINE SECURITY MANAGEMENT
3
16-18
13-15
06-08
17-19
08-10
19-21
17-19
07-09
18-20
16-18
06-08
18-20
6.950.000
203
PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL (OIL FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK
4
17-20
14-17
13-16
18-21
30-02
12-15
18-21
22-25
19-22
17-20
13-16
05-08
7.950.000
204 205
Oil Transportation Piping GAS DISPERSION ANALYSIS
4 3
02-05 09-11
30-02 06-08
28-03 27-01
03-06 10-12
08-11 22-24
06-09 19-21
03-06 10-12
31-03 31-02
04-07 11-13
02-05 09-11
31-03 30-01
19-22 27-29
7.950.000 6.950.000
No.
Judul
Durasi
Jan
Feb
Mar
Apr
Mei
Jun
Juli
Aug
Sep
Okt
Nov
Des
Harga
3
25-27
22-24
08-10
26-28
02-04
19-21
26-28
09-11
27-29
25-27
08-10
27-29
6.950.000
2
16-17
13-14
06-07
17-18
08-09
19-20
17-18
07-08
18-19
16-17
06-07
18-19
3.950.000
ENGINEERING - MAINTENANCE 1 2
RELIABILITY, AVAILABILITY & MAINTAINABILITY ANALYSIS RELIABILITY ENGINEERING (TEKNIK KEANDALAN)
11
3
ADVANCED MAINTENANCE MANAGEMENT
4
09-12
06-09
27-02
10-13
08-11
12-15
10-13
07-10
11-14
09-12
30-02
18-21
7.950.000
4
MACHINERY CONDITION MONITORING FOR PREDICTIVE AND PREVENTIVE MAINTENANCE
4
16-19
13-16
20-23
17-20
15-18
06-09
17-20
21-24
18-21
16-19
20-23
19-22
7.950.000
5
MAINTENANCE PLANNING SCHEDULING AND COORDINATING
4
23-26
20-23
28-31
24-27
29-01
13-16
24-27
28-31
25-28
23-26
28-01
05-08
7.950.000
4
23-26
20-23
06-09
24-27
29-01
12-15
24-27
28-31
25-28
23-26
06-09
18-21
7.950.000
4
09-12
06-09
06-09
10-13
15-18
05-08
10-13
21-24
11-14
09-12
06-09
04-07
7.950.000
3
04-06
01-03
15-17
05-07
22-24
19-21
05-07
14-16
06-08
04-06
15-17
27-29
6.500.000
6 7 8
MAINTENANCE MANAGEMENT SYSTEM FOR SUPERVISOR MAINTENANCE AND SPARE PART MANAGEMENT FAULT FINDING SKILLS TECHNICAL TROUBLESHOOTING
9
Production Optimization and Minimize Down Time
3
09-11
06-08
13-15
10-12
22-24
19-21
10-12
14-16
11-13
09-11
13-15
27-29
6.500.000
10
RELIABILITY CENTERED MAINTENANCE (RCM)
3
25-27
22-24
27-29
26-28
22-24
19-21
26-28
14-16
27-29
25-27
27-29
27-29
6.500.000
11
RELIABILITY CENTERED MAINTENANCE (RCM) Increasing Safety & Reliability in Gas Pipeline System
3
04-06
01-03
27-01
05-07
22-24
19-21
05-07
14-16
06-08
04-06
30-01
27-29
6.500.000
12
MAINTENANCE MANAGEMENT
3
16-18
13-15
15-17
17-19
22-24
19-21
17-19
14-16
18-20
16-18
15-17
27-29
6.500.000
13
EFFECTIVENESS DESIGN OF MAINTENANCE ORGANIZATION AND ADMINISTRATION
3
04-06
01-03
22-24
05-07
22-24
19-21
05-07
21-23
06-08
04-06
22-24
27-29
5.950.000
14
MAINTENANCE CONTROL AND MONITORING
3
02-04
30-01
15-17
03-05
17-19
19-21
03-05
14-16
04-06
02-04
15-17
27-29
6.500.000
15
THE ECONOMICS OF MAINTENANCE MANAGEMENT
3
02-04
30-01
01-03
03-05
02-04
19-21
03-05
31-02
04-06
02-04
01-03
06-08
5.950.000
3
23-25
20-22
06-08
24-26
08-10
19-21
24-26
07-09
25-27
23-25
06-08
27-29
6.500.000
4
02-05
30-02
13-16
03-06
15-18
06-09
03-06
21-24
04-07
02-05
13-16
04-07
8.500.000
18
MAINTENANCE PLANNING AND SCHEDULING PREVENTIVE & PREDICTIVE MAINTENANCE (PPM) RELIABILITY CENTERED MAINTENANCE
3
11-13
08-10
20-22
11-13
22-24
14-16
12-14
14-16
13-15
11-13
20-22
13-15
6.500.000
19
Integrated Maintenance Management
4
10-13
07-10
21-24
10-13
29-01
06-09
11-14
22-25
12-15
10-13
21-24
12-15
7.950.000
20
Effective and Efficient of Maintenance Management
3
18-20
15-17
29-31
19-21
22-24
19-21
19-21
29-31
20-22
18-20
29-01
20-22
5.950.000
21
Total Productive Maintenance (TPM)
4
24-27
21-24
06-09
25-28
15-18
06-09
25-28
21-24
26-29
24-27
06-09
19-22
7.950.000
4
03-06
31-03
28-31
04-07
09-12
13-16
04-07
01-04
05-08
03-06
28-01
18-21
7.950.000
4
23-26
20-23
14-17
24-27
02-05
05-08
24-27
28-31
25-28
23-26
14-17
19-22
7.950.000
4 4
02-05 23-26
30-02 20-23
20-23 27-30
03-06 24-27
08-11 29-01
13-16 06-09
03-06 24-27
31-03 28-31
04-07 25-28
02-05 23-26
20-23 27-30
05-08 04-07
7.950.000 7950000
4
09-12
06-09
27-02
10-13
08-11
05-08
10-13
07-10
11-14
09-12
30-02
18-21
7.950.000
16 17
22 23 24 25 26
PREVENTIVE MAINTENANCE (SCHEDULE & PREDICTIVE MAINTENANCE) TEKNIK PEMELIHARAAN KENDARAAN (PREVENTIVE MAINTENANCE UNTUK KENDARAAN) TEKNIK PERAWATAN MEKANIK MAINTENANCE OF MACHINE TOOLS COMPETITIVE MAINTENANCE & SPARE PARTS MANAGEMENT
12
27 28 29
Maintenance Strategic Planning MAINTENANCE SYSTEM AND DOCUMENTATION MANAGING MAINTENANCE RESOURCES
4 4 4
24-27 03-06 09-12
21-24 31-03 06-09
07-10 14-17 21-24
25-28 04-07 10-13
09-12 16-19 30-02
06-09 13-16 05-08
25-28 04-07 10-13
08-11 22-25 28-31
26-29 05-08 11-14
24-27 03-06 09-12
07-10 14-17 21-24
05-08 12-15 18-21
7.950.000 7.950.000 7.950.000
30
RELIABILITY CENTERED MAINTENANCE & RISK BASED INSPECTION
5
02-06
30-03
06-10
03-07
08-12
05-09
03-07
07-11
04-08
02-06
06-10
04-08
8.950.000
31 32 33
ROOT CAUSE ANALYSIS Spare Part Management ADVANCED MAINTENANCE MANAGEMENT
4 4 4
10-13 17-20 09-12
07-10 14-17 06-09
13-16 20-23 27-02
10-13 18-21 10-13
15-18 29-01 15-18
13-16 05-08 12-15
11-14 18-21 10-13
21-24 28-31 07-10
12-15 19-22 11-14
10-13 17-20 09-12
13-16 20-23 30-02
11-14 19-22 04-07
7.950.000 7.950.000 7.950.000
34
CONDITIONS BASE INSPECTION AND MAINTENANCE
4
09-12
06-09
21-24
10-13
15-18
12-15
10-13
07-10
11-14
09-12
21-24
18-21
7.950.000
4 4 4 4
16-19 23-26 02-05 16-19
13-16 20-23 30-02 13-16
28-03 07-10 14-17 20-23
17-20 24-27 03-06 17-20
29-01 02-05 08-11 29-01
05-08 13-16 06-09 05-08
17-20 24-27 03-06 17-20
21-24 28-31 31-03 21-24
18-21 25-28 04-07 18-21
16-19 23-26 02-05 16-19
31-03 07-10 14-17 20-23
11-14 18-21 05-08 05-08
7.950.000 7.950.000 7.950.000 7.950.000
4
23-26
20-23
13-16
24-27
02-05
13-16
24-27
28-31
25-28
23-26
13-16
04-07
7.950.000
4 4 4 4 4 4
17-20 09-12 10-13 24-27 10-13 17-20
14-17 06-09 07-10 21-24 07-10 14-17
28-03 07-10 27-02 13-16 20-23 27-30
18-21 10-13 10-13 25-28 10-13 18-21
30-02 15-18 16-19 02-05 30-02 02-05
05-08 12-15 12-15 13-16 05-08 13-16
18-21 10-13 11-14 25-28 11-14 18-21
22-25 07-10 08-11 28-31 22-25 28-31
19-22 11-14 12-15 26-29 12-15 19-22
17-20 09-12 10-13 24-27 10-13 17-20
31-03 07-10 30-02 13-16 20-23 27-30
05-08 18-21 04-07 18-21 11-14 18-21
7.950.000 7.950.000 7.950.000 7.950.000 7.950.000 7.950.000
3
09-11
06-08
27-29
10-12
29-31
05-07
10-12
28-30
11-13
09-11
27-29
11-13
6.500.000
Durasi
Jan
Feb
Mar
Apr
Mei
Jun
Juli
Aug
Sep
Okt
Nov
Des
Harga
4
23-26
20-23
13-16
24-27
29-01
13-16
24-27
28-31
25-28
23-26
13-16
18-21
7.950.000
4
09-12
06-09
06-09
10-13
15-18
06-09
10-13
07-10
11-14
09-12
06-09
19-22
7.950.000
35 36 37 38 39 40 41 42 43 44 45 46
No.
MAINTENANCE MANAGEMENT MAINTENANCE OF MACHINE COMPONENTS MAINTENANCE SYSTEM AND COST MODERN MAINTENANCE MANAGEMENT PERENCANAAN DAN PENJADWALAN PERAWATAN (MAINTENANCE PLANNING AND SCHEDULING) PREDICTIVE MAINTENANCE RELIABILITY CENTERED MAINTENANCE (RCM) TEKNOLOGI PERAWATAN MESIN Total Productive Maintenance (TPM) PREVENTIVE MAINTENANCE PREVENTIVE MAINTENANCE GENERATOR CULTURE CHANGE FOR MAINTENANCE AND RELIABILITY IMPROVEMENT
Judul
ENGINEERING - ELECTRICAL 1 2 3
PENGENDALIAN MOTOR LISTRIK SECARA ELEKTRONIK GENSET TEKNOLOGI, PERAWATAN DAN OPERASI SISTEM KONTROL MOTOR LISTRIK
4
02-05
30-02
07-10
03-06
15-18
12-15
03-06
07-10
04-07
02-05
07-10
12-15
7.950.000
4
TRAFO PRINCIPLES, APPLICATION AND MAINTENANCE
4
09-12
06-09
14-17
10-13
29-01
05-08
10-13
21-24
11-14
09-12
14-17
19-22
7.950.000
5 6 7
ADVANCED CONTROL FOUNDATION FLOWMETERING AND CUSTODY TRANSFER PRACTICAL PROCESS CONTROL
4 4 4
16-19 02-05 09-12
13-16 30-02 06-09
20-23 27-02 06-09
17-20 03-06 10-13
29-01 08-11 15-18
12-15 13-16 06-09
17-20 03-06 10-13
21-24 31-03 07-10
18-21 04-07 11-14
16-19 02-05 09-12
20-23 30-02 06-09
18-21 11-14 19-22
7.950.000 7.950.000 7.950.000
13
8
Implementasi DSP (digital signal processing) Dalam Sistem Komunikasi
4
02-05
30-02
13-16
03-06
02-05
12-15
03-06
31-03
04-07
02-05
13-16
04-07
7.950.000
9
INDUSTRIAL ROBOTICS SENSING, PLANNING, AND CONTROL
4
16-19
13-16
27-02
17-20
08-11
12-15
17-20
07-10
18-21
16-19
30-02
04-07
7.950.000
10
AUTOMATIC VOLTAGE REGULATOR(AVR) OPERATION AND MAINTENANCE
4
03-06
31-03
20-23
04-07
02-05
05-08
04-07
01-04
05-08
03-06
20-23
19-22
7.950.000
11
GENERATOR OPERATION, MAINTENANCE & TROUBLESHOOTING
4
16-19
13-16
28-03
17-20
15-18
06-09
17-20
21-24
18-21
16-19
31-03
04-07
7.950.000
12 13 14
PLC ( Tingkat dasar ) PLC (TINGKAT MAHIR) POWER FACTOR IMPROVEMENT
4 4 4
17-20 24-27 02-05
14-17 21-24 30-02
28-03 07-10 14-17
18-21 25-28 03-06
16-19 30-02 02-05
06-09 13-16 05-08
18-21 25-28 03-06
22-25 28-31 31-03
19-22 26-29 04-07
17-20 24-27 02-05
31-03 07-10 14-17
19-22 05-08 11-14
7.950.000 7.950.000 7.950.000
15
PROTEKSI TERHADAP GANGGUAN SAMBARAN PETIR
4
03-06
31-03
06-09
04-07
02-05
05-08
04-07
01-04
05-08
03-06
06-09
19-22
7.950.000
16
SISTEM INSTALASI DAN PROTEKSI JARINGAN TENAGA LISTRIK
4
17-20
14-17
20-23
18-21
16-19
06-09
18-21
22-25
19-22
17-20
20-23
11-14
7.950.000
17 18 19
SISTEM INSTALASI TENAGA LISTRIK TRANFORMER OPERATION & MAINTENANCE Uninterupted Power Suply
4 4 4
24-27 23-26 03-06
21-24 20-23 31-03
28-31 21-24 27-30
25-28 24-27 04-07
30-02 29-01 02-05
13-16 13-16 05-08
25-28 24-27 04-07
28-31 28-31 01-04
26-29 25-28 05-08
24-27 23-26 03-06
28-01 21-24 27-30
18-21 05-08 11-14
7.950.000 7.950.000 7.950.000
20
PERFORMANCE ANALISYS AND MAINTENANCE OF ELECTRICAL DISTRIBUTION NETWORKS FOR SUPERVISOR
4
09-12
06-09
20-23
10-13
08-11
13-16
10-13
07-10
11-14
09-12
20-23
11-14
8.500.000
21
PERFORMANCE ANALISYS AND OPERATING OF GENERATOR SET FOR SENIOR OPERATOR AND ENGINEER
4
16-19
13-16
27-30
17-20
15-18
06-09
17-20
21-24
18-21
16-19
27-30
19-22
8.500.000
22
PERFORMANCE ANALISYS AND OPERATING OF INDUCTION MOTOR FOR SENIOR OPERATOR AND JUNIOR SUPERVISOR
4
24-27
21-24
27-02
25-28
30-02
12-15
25-28
28-31
26-29
24-27
30-02
05-08
8.500.000
23
DISTRIBUTED CONTROL SYSTEM (DCS) PRINCIPLES, MAINTENANCE, OPERATION, PROGRAMMING & TROUBLESHOOTING
5
09-13
06-10
27-03
17-21
08-12
05-09
10-14
07-11
11-15
09-13
30-03
18-22
9.500.000
24
DISTRIBUTED CONTROL SYSTEMS (DCS) FUNDAMENTAL
4
17-20
14-17
07-10
10-13
16-19
12-15
18-21
22-25
19-22
17-20
07-10
05-08
8.500.000
25 26
Electrical Control Wiring PLC COMMUNICATION AND LAN
4 4
24-27 17-20
21-24 14-17
14-17 27-30
25-28 18-21
30-02 16-19
05-08 12-15
25-28 18-21
28-31 22-25
26-29 19-22
24-27 17-20
14-17 27-30
11-14 18-21
8.500.000 8.500.000
27
PLC OPERATION, PROGRAMMING, TROUBLESHOOTING AND MAINTENANCE
4
23-26
20-23
28-03
24-27
29-01
06-09
24-27
28-31
25-28
23-26
31-03
04-07
8.500.000
28 29 30
ACDC ELECTRICAL MOTOR CONTROL BASIC ELECTRICAL BASIC ELECTRICAL FOR NON ELECTRICIAN
4 3 4
23-26 02-04 09-12
20-23 30-01 06-09
20-23 27-29 27-02
24-27 03-05 10-13
29-01 22-24 02-05
05-08 19-21 12-15
24-27 03-05 10-13
21-24 28-30 31-03
25-28 04-06 11-14
23-26 02-04 09-12
20-23 27-29 30-02
04-07 27-29 11-14
7.950.000 5.950.000 7.950.000
14
31 32 33
DISTRIBUTION SYSTEM PROTECTION Electric Installation In Hazardous Area ELECTRICAL CALIBRATION
4 4 3
16-19 24-27 04-06
13-16 21-24 01-03
06-09 13-16 22-24
17-20 25-28 05-07
08-11 15-18 22-24
06-09 13-16 19-21
17-20 25-28 05-07
07-10 22-25 14-16
18-21 26-29 06-08
16-19 24-27 04-06
06-09 13-16 22-24
18-21 05-08 27-29
7.950.000 7.950.000 5.950.000
34
ELECTRICAL EQUIPMENT SYSTEM AND MAINTENANCE
4
10-13
07-10
28-31
10-13
30-02
05-08
11-14
28-31
12-15
10-13
28-01
12-15
7.950.000
35
ELECTRICAL POWER GENERATOR OPERATION, PROTECTION AND MAINTANANCE
5
16-20
13-17
27-03
17-21
08-12
12-16
17-21
31-04
18-22
16-20
30-03
18-22
8.950.000
36
ELECTRICAL POWER SYSTEM ANALYSIS
4
23-26
20-23
07-10
24-27
02-05
06-09
24-27
08-11
25-28
23-26
07-10
04-07
7.950.000
37
ELECTRICAL POWER SYSTEM ANALYSIS USING SOFTWARE APPLICATION
4
02-05
30-02
14-17
03-06
16-19
12-15
03-06
21-24
04-07
02-05
14-17
11-14
7.950.000
38 39 40 41
ELECTRICAL POWER SYSTEM PROTECTION ELECTRICAL SYSTEM GENERATORSET ELECTRONIC SHUTDOWN AND LOGIC SYSTEM GENERATOR EXCITATION SYSTEM
4 4 4 4
09-12 16-19 24-27 03-06
06-09 13-16 21-24 31-03
20-23 27-30 27-02 06-09
10-13 17-20 25-28 04-07
29-01 02-05 08-11 15-18
05-08 13-16 06-09 12-15
10-13 17-20 25-28 04-07
28-31 31-03 07-10 22-25
11-14 18-21 26-29 05-08
09-12 16-19 24-27 03-06
20-23 27-30 30-02 06-09
18-21 05-08 12-15 19-22
7.950.000 7.950.000 7.950.000 7.950.000
42
GROUNDING SYSTEM AND LIGHTNING PROTECTION
4
10-13
07-10
13-16
10-13
30-02
05-08
11-14
28-31
12-15
10-13
13-16
04-07
7.950.000
43
High Voltage Electrical Equipmment Operation, Maintenance and Repair
5
16-20
13-17
20-24
17-21
08-12
12-16
17-21
31-04
18-22
16-20
20-24
11-15
8.950.000
44
INSTRUMENTATION ELECTRIC Operation and Maintenance
4
23-26
20-23
28-31
24-27
02-05
06-09
24-27
08-11
25-28
23-26
28-01
18-21
7.950.000
45 46
LV AND MV GENERATOR LV ELECTRICAL POWER DISTRIBUTION SYSTEM
4 4
02-05 09-12
30-02 06-09
28-03 07-10
03-06 10-13
16-19 29-01
12-15 05-08
03-06 10-13
21-24 28-31
04-07 11-14
02-05 09-12
31-03 07-10
05-08 11-14
7.950.000 7.950.000
47
LV SWITCHGEAR MAINTENANCE AND COORDINATION
4
16-19
13-16
14-17
17-20
02-05
13-16
17-20
31-03
18-21
16-19
14-17
19-22
7.950.000
48 49 50 51 52
POWER ELECTRICAL INSTALLATION SYSTEM POWER ELECTRONICS POWER PROTECTION RELAY SYSTEM POWER TRANSFORMER PROGRAMMABLE LOGIC CONTROLLER(PLC)
4 4 4 4 4
24-27 03-06 10-13 17-20 23-26
21-24 31-03 07-10 14-17 20-23
20-23 27-30 27-02 06-09 13-16
25-28 04-07 10-13 18-21 24-27
08-11 15-18 30-02 02-05 09-12
06-09 12-15 05-08 13-16 06-09
25-28 04-07 11-14 18-21 24-27
07-10 22-25 28-31 01-04 08-11
26-29 05-08 12-15 19-22 25-28
24-27 03-06 10-13 17-20 23-26
20-23 27-30 30-02 06-09 13-16
04-07 12-15 18-21 05-08 11-14
7.950.000 7.950.000 7.950.000 7.950.000 7.950.000
53
Soft Starter (Operation, Protection and Maintanance)
3
02-04
30-01
22-24
03-05
22-24
19-21
03-05
14-16
04-06
02-04
22-24
27-29
5.950.000
54
TRANSMISSION AND DISTRIBUTION OPERATION AND MAINTENANCE
4
09-12
06-09
28-31
10-13
16-19
12-15
10-13
21-24
11-14
09-12
28-01
19-22
7.950.000
55
Uninterruptible Power Suply Operation and Maintenance
4
16-19
13-16
28-03
17-20
29-01
05-08
17-20
28-31
18-21
16-19
31-03
04-07
7.950.000
56 57 58 59
VARIABLE FREQUENCY DRIVES VARIABLE SPEED DRIVES POWER DISTRIBUTION TRANSFORMER PEMELIHARAAN MOTOR MOTOR LISTRIK
4 4 4 4
24-27 03-06 10-13 17-20
21-24 31-03 07-10 14-17
07-10 14-17 20-23 27-30
25-28 04-07 10-13 18-21
02-05 08-11 15-18 30-02
13-16 06-09 12-15 05-08
25-28 04-07 11-14 18-21
31-03 07-10 22-25 28-31
26-29 05-08 12-15 19-22
24-27 03-06 10-13 17-20
07-10 14-17 20-23 27-30
12-15 18-21 05-08 11-14
7.950.000 7.950.000 7.950.000 7.950.000
15
60
TRANSFORMATOR DAYA OPERASI DAN PEMELIHARAAN
3
23-25
20-22
27-01
24-26
22-24
19-21
24-26
14-16
25-27
23-25
30-01
27-29
5.950.000
61 62
ELECTRONIC SWITCHBOARD RESCUE GARDU INDUK
3 3
02-04 09-11
30-01 06-08
06-08 13-15
03-05 10-12
22-24 22-24
19-21 19-21
03-05 10-12
14-16 14-16
04-06 11-13
02-04 09-11
06-08 13-15
27-29 27-29
5.950.000 5.950.000
63
TEKNIK KONSERVASI ENERGI MELALUI AUDIT ENERGI PADA BANGUNAN GEDUNG
4
16-19
13-16
07-10
17-20
29-01
12-15
17-20
21-24
18-21
16-19
07-10
11-14
7.950.000
64
Data Akuisisi, Interfacing, dan Sistem Monitoring
3
23-25
20-22
20-22
24-26
22-24
19-21
24-26
21-23
25-27
23-25
20-22
27-29
6.750.000
65
Pemrograman Mikrokontroler AVR dengan CodeVisionAVR
3
02-04
30-01
27-29
03-05
29-31
05-07
03-05
28-30
04-06
02-04
27-29
04-06
6.750.000
66
Pemrograman Mikrokontroler untuk Robotika
3
09-11
06-08
27-01
10-12
02-04
12-14
10-12
31-02
11-13
09-11
30-01
11-13
6.750.000
67
ADVANCE COURSE ON LIGHTNING PROTECTION AND GROUNDING SYSTEM
5
16-20
13-17
27-03
17-21
08-12
12-16
17-21
31-04
18-22
16-20
30-03
18-22
9.500.000
68
Lightning Protection and Grounding System for Oil & Gas Refinery and Petrochemical Installation
3
23-25
20-22
06-08
24-26
02-04
19-21
24-26
07-09
25-27
23-25
06-08
27-29
6.950.000
69
LIGHTNING PROTECTION AND GROUNDING SYSTEM FOR POWER PLANT, TRANSMISSION, DISTRIBUTION AND LARGE INDUSTRY
3
02-04
30-01
13-15
03-05
15-17
19-21
03-05
14-16
04-06
02-04
13-15
04-06
6.950.000
4
09-12
06-09
06-09
10-13
08-11
05-08
10-13
07-10
11-14
09-12
06-09
11-14
8.500.000
4
16-19
13-16
13-16
17-20
15-18
12-15
17-20
21-24
18-21
16-19
13-16
18-21
8.500.000
4
23-26
20-23
20-23
24-27
29-01
06-09
24-27
28-31
25-28
23-26
20-23
04-07
8.500.000
70 71 72
ADVANCED PLC PROGRAMMING AND IMPLEMENTATION PLC INTEGRATION TO LOCAL AREA NETWORK (LAN) PLC (ROGRAMMABLE LOGIC CONTROLLER) PRINCIPLES, OPERATION AND PROGRAMMING
73
SCADA (SUPERVISORY CONTROL AND DATA ACQUISITION) PRINCIPLES, HARDWARE SYSTEM, OPERATION & PROGRAMMING
4
02-05
30-02
27-30
03-06
02-05
13-16
03-06
31-03
04-07
02-05
27-30
12-15
8.500.000
74 75
NUMERICAL CONTROL AND ROBOTIC PROGRAMMABLE LOGIC CONTROLLER (PLC)
4 4
16-19 02-05
13-16 30-02
06-09 06-09
17-20 03-06
15-18 08-11
12-15 06-09
17-20 03-06
07-10 31-03
18-21 04-07
16-19 02-05
06-09 06-09
04-07 05-08
7.950.000 7.950.000
4
03-06
31-03
27-30
04-07
02-05
05-08
04-07
01-04
05-08
03-06
27-30
04-07
7.950.000
3
02-04
30-01
13-15
03-05
15-17
05-07
03-05
14-16
04-06
02-04
13-15
04-06
5.950.000
76 77
Electric motor Operation, Maintenance & Troubleshooting Electrical Panel Design
78
Electrical Safety For Electrical Technician Trainer
4
09-12
06-09
20-23
10-13
29-01
12-15
10-13
21-24
11-14
09-12
20-23
11-14
7.950.000
79
Motor Rewinding
3
16-18
13-15
27-29
17-19
22-24
19-21
17-19
28-30
18-20
16-18
27-29
18-20
5.950.000
2
23-24
20-21
27-28
24-25
02-03
08-09
24-25
31-01
25-26
23-24
30-31
27-28
3.950.000
80
Perhitungan Perkiraan Biaya Proyek Mekanikal
16
Elektrikal Untuk Bangunan Gedung 81
Power Transformer (Operation, Testing, Asessment And Maintenance)
4
03-06
31-03
06-09
04-07
08-11
13-16
04-07
07-10
05-08
03-06
06-09
05-08
7.950.000
ENGINEERING - IT 1
PRESENTATION SKILL FOR PUBLIC RELATIONS & MARKETING STAFF (USING MICROSOFT POWER POINT)
2
12-13
09-10
06-07
12-13
08-09
19-20
13-14
07-08
14-15
12-13
06-07
14-15
3.950.000
2 3 4
IT AUDIT PRACTICES IT HELPDESK AUTOCAD COSTUMIZATION
3 3 4
11-13 18-20 23-26
08-10 15-17 20-23
27-29 01-03 13-16
10-12 19-21 24-27
29-31 02-04 29-01
19-21 19-21 13-16
12-14 19-21 24-27
28-30 31-02 28-31
13-15 20-22 25-28
11-13 18-20 23-26
27-29 01-03 13-16
11-13 20-22 12-15
5.950.000 5.950.000 7.950.000
5
INFORMATION TECHNOLOGY & TELECOMUNICATION
4
24-27
21-24
27-02
25-28
30-02
13-16
25-28
28-31
26-29
24-27
30-02
18-21
7.950.000
6 7 8
Holistic Information Security Information Security System OPTIMALISASI CYBER PUBLIC RELATION
3 3 3
23-25 02-04 09-11
20-22 30-01 06-08
27-01 06-08 13-15
24-26 03-05 10-12
02-04 08-10 15-17
05-07 12-14 19-21
24-26 03-05 10-12
31-02 07-09 14-16
25-27 04-06 11-13
23-25 02-04 09-11
30-01 06-08 13-15
27-29 04-06 11-13
5.950.000 5.950.000 5.950.000
9
PENGEMBANGAN KONTEN SITUS WEB PERUSAHAAN
3
16-18
13-15
20-22
17-19
22-24
07-09
17-19
21-23
18-20
16-18
20-22
18-20
5.950.000
10 11 12 13 14
TEKNIK DESAIN GRAFIS PADA WEB TEKNIK DESAIN WEB ADVANCE MICROSOFT EXCEL ADVANCE MICROSOFT POWERPOINT ADVANCE MICROSOFT WORD
3 3 3 3 3
25-27 04-06 02-04 11-13 18-20
22-24 01-03 30-01 08-10 15-17
27-29 01-03 20-22 06-08 13-15
26-28 05-07 03-05 11-13 19-21
29-31 03-05 22-24 08-10 15-17
14-16 19-21 19-21 07-09 14-16
26-28 05-07 03-05 12-14 19-21
28-30 02-04 14-16 07-09 14-16
27-29 06-08 04-06 13-15 20-22
25-27 04-06 02-04 11-13 18-20
27-29 01-03 20-22 06-08 13-15
27-29 06-08 27-29 11-13 20-22
5.950.000 5.950.000 5.950.000 5.950.000 5.950.000
15
BASIC AUTOCAD 2D (2D TECHNICAL DRAWING WITH AUTOCAD)
5
23-27
20-24
27-03
24-28
08-12
05-09
24-28
31-04
25-29
23-27
30-03
04-08
8.950.000
16
BASIC AUTOCAD 3D (3D TECHNICAL DRAWING WITH AUTOCAD)
2
02-03
30-31
06-07
03-04
02-03
12-13
03-04
07-08
04-05
02-03
06-07
27-28
3.950.000
17 18 19
BASIC TELECOMMUNICATION PABX BASIC VSAT SYSTEM FIBER OPTIC SYSTEM
3 3 3
16-18 23-25 09-11
13-15 20-22 06-08
27-01 06-08 20-22
17-19 24-26 10-12
22-24 22-24 22-24
19-21 19-21 19-21
17-19 24-26 10-12
14-16 14-16 14-16
18-20 25-27 11-13
16-18 23-25 09-11
30-01 06-08 20-22
27-29 27-29 27-29
5.950.000 5.950.000 6.500.000
20
Fraud Management in telecommunication business
3
18-20
15-17
27-29
19-21
22-24
19-21
19-21
14-16
20-22
18-20
27-29
27-29
5.950.000
21
INTERNETWORKING DENGAN TCP IP
3
25-27
22-24
01-03
26-28
02-04
19-21
26-28
31-02
27-29
25-27
01-03
27-29
5.950.000
22
IPTV - TEKNOLOGI, PELUANG BISNIS DAN REGULASI
3
04-06
01-03
08-10
05-07
08-10
19-21
05-07
07-09
06-08
04-06
08-10
27-29
5.950.000
23
NETWORK MANAGEMENT AND OPERATIONS SUPPORT SYSTEM
3
11-13
08-10
15-17
11-13
15-17
19-21
12-14
14-16
13-15
11-13
15-17
11-13
5.950.000
24
POWER LINE CARRIER
3
16-18
13-15
22-24
17-19
22-24
19-21
17-19
21-23
18-20
16-18
22-24
18-20
5.950.000
17
25
Teknologi dan Bisnis di WiMAX dan Sub WiMAX
3
23-25
20-22
29-31
24-26
29-31
19-21
24-26
28-30
25-27
23-25
29-01
27-29
5.950.000
26
MANAJEMEN KABEL PADA JARINGAN TELEKOMUNIKASI
4
02-05
30-02
27-02
03-06
02-05
05-08
03-06
01-04
04-07
02-05
30-02
04-07
8.500.000
27 28
MIKROTIK FUNDAMENTAL FUNDAMENTAL OF RADIO COMMUNICATIONS
3 3
18-20 25-27
15-17 22-24
13-15 20-22
19-21 26-28
17-19 22-24
12-14 19-21
19-21 26-28
14-16 23-25
20-22 27-29
18-20 25-27
13-15 20-22
20-22 27-29
5.950.000 6.500.000
29
INFORMATION TECHNOLOGY INFRASTRUCTURE LIBRARY (I T I L) VERSION 3.1
4
17-20
14-17
27-02
18-21
02-05
06-09
18-21
31-03
19-22
17-20
30-02
19-22
7.950.000
30
MASTERING MICROSOFT EXCEL 2007
2
16-17
13-14
30-31
17-18
01-02
12-13
17-18
30-31
18-19
16-17
30-01
18-19
3.950.000
31
CAD BIDANG TEKNIK MESIN (CAD FOR MECHANICAL AUTOCAD OR CATIA)
4
17-20
14-17
28-03
18-21
30-02
05-08
18-21
22-25
19-22
17-20
31-03
19-22
7.950.000
32 33
Teknologi CAD CAM PENGEMBANGAN SITUS WEB
4 3
02-05 23-25
30-02 20-22
28-31 27-01
03-06 24-26
08-11 22-24
06-09 19-21
03-06 24-26
31-03 14-16
04-07 25-27
02-05 23-25
28-01 30-01
19-22 27-29
7.950.000 5.950.000
34
COLLABORATION MS Office AND EFFECTIVE PRESENTATION
3
04-06
01-03
27-01
05-07
02-04
19-21
05-07
31-02
06-08
04-06
30-01
04-06
5.950.000
ENGINEERING - MINING 1 2 3
BATUBARA COAL EXPLORATION (EKSPLORASI BATUBARA) GEOLOGY FOR NON GEOLOGIST
3 4 4
02-04 09-12 16-19
30-01 06-09 13-16
27-01 06-09 13-16
03-05 10-13 17-20
02-04 08-11 15-18
05-07 12-15 06-09
03-05 10-13 17-20
31-02 07-10 21-24
04-06 11-14 18-21
02-04 09-12 16-19
30-01 06-09 13-16
04-06 11-14 18-21
6.500.000 7.950.000 7.950.000
4
PEMBORAN DAN PELEDAKAN UNTUK PERTAMBANGAN
3
23-25
20-22
20-22
24-26
22-24
19-21
24-26
14-16
25-27
23-25
20-22
27-29
5.950.000
5 6
PEMINDAHAN TANAH MEKANIS VENTILASI TAMBANG
3 3
04-06 11-13
01-03 08-10
27-29 01-03
05-07 10-12
29-31 03-05
14-16 19-21
05-07 12-14
28-30 02-04
06-08 13-15
04-06 11-13
27-29 01-03
06-08 13-15
5.950.000 6.500.000
7
EVALUASI STUDI KELAYAKAN DALAM USAHA PERTAMBANGAN
3
18-20
15-17
08-10
19-21
10-12
05-07
19-21
09-11
20-22
18-20
08-10
20-22
5.950.000
8 9
PERENCANAAN TAMBANG TERBUKA PEMBORAN EKSPLORASI BATUBARA
3 3
25-27 02-04
22-24 30-01
15-17 22-24
26-28 03-05
17-19 22-24
12-14 19-21
26-28 03-05
14-16 23-25
27-29 04-06
25-27 02-04
15-17 22-24
27-29 04-06
5.950.000 5.950.000
Durasi
Jan
Feb
Mar
Apr
Mei
Jun
Juli
Aug
Sep
Okt
Nov
Des
Harga
No.
Judul
ENGINEERING - MIGAS 1
PETROLEUM PLANT & PIPELINE SECURITY MANAGEMENT
3
16-18
13-15
06-08
17-19
08-10
19-21
17-19
07-09
18-20
16-18
06-08
18-20
6.950.000
2
PEMBANGKITAN ALIRAN PERMUKAAN UNTUK OIL SPILL (OIL FENCE) SEBAGAI PENGUMPUL TUMPAHAN MINYAK
4
17-20
14-17
13-16
18-21
30-02
12-15
18-21
22-25
19-22
17-20
13-16
05-08
7.950.000
3 4 5
Oil Transportation Piping GAS DISPERSION ANALYSIS H2S AWARENESS
4 3 3
02-05 09-11 04-06
30-02 06-08 01-03
28-03 27-01 20-22
03-06 10-12 05-07
08-11 22-24 22-24
06-09 19-21 19-21
03-06 10-12 05-07
31-03 31-02 14-16
04-07 11-13 06-08
02-05 09-11 04-06
31-03 30-01 20-22
19-22 27-29 27-29
7.950.000 6.950.000 5.950.000
18
6
GAS PROCESSING AND EQUIPMENT
4
09-12
06-09
27-02
10-13
02-05
05-08
10-13
31-03
11-14
09-12
30-02
11-14
8.500.000
7
BASIC OF SURFACE OPERATION AND MAINTENANCE FOR OIL AND GAS INDUSTRIES
4
17-20
14-17
28-03
18-21
16-19
06-09
18-21
22-25
19-22
17-20
31-03
11-14
7.950.000
8
PENGETAHUAN TEKNIK PERMINYAKAN UNTUK MANAJERIAL
4
03-06
31-03
20-23
04-07
02-05
05-08
04-07
01-04
05-08
03-06
20-23
04-07
7.950.000
4
17-20
14-17
06-09
18-21
16-19
05-08
18-21
22-25
19-22
17-20
06-09
05-08
8.500.000
4
03-06
31-03
14-17
04-07
30-02
12-15
04-07
28-31
05-08
03-06
14-17
19-22
8.750.000
4
10-13
07-10
21-24
10-13
02-05
06-09
11-14
01-04
12-15
10-13
21-24
04-07
8.750.000
9 10 11
Oil and Gas Measurements GAS DEHYDRATION AND GLYCOL REGENERATION GAS SWEETENING H2S AND CO2 REMOVAL IN CHEMICAL, OIL AND GAS
12
GAS HANDLING, CONDITIONING, AND PROCESSING FACILITIES
4
23-26
20-23
27-02
24-27
02-05
12-15
24-27
31-03
25-28
23-26
30-02
04-07
7.950.000
13
OIL AND GAS HANDLING FACILITIES
4
03-06
31-03
28-03
04-07
09-12
05-08
04-07
08-11
05-08
03-06
31-03
19-22
7.950.000
14
OIL AND GAS PROCESSING PLANT DESIGN AND OPERATION
4
10-13
07-10
07-10
10-13
16-19
13-16
11-14
22-25
12-15
10-13
07-10
04-07
7.950.000
15
Drilling operations for operator in oil and gas industries
4
23-26
20-23
13-16
24-27
29-01
05-08
24-27
21-24
25-28
23-26
13-16
11-14
8.500.000
16
NATURAL GAS PROCESSING - FRACTINATION AND REFREGERATION
4
09-12
06-09
27-30
10-13
08-11
06-09
10-13
31-03
11-14
09-12
27-30
04-07
8.500.000
17
PETROLEUM ENGINEERING FOR NON PETROLEUM EMPLOYEE
4
16-19
13-16
27-02
17-20
15-18
13-16
17-20
07-10
18-21
16-19
30-02
12-15
8.500.000
18
PRACTICAL ASPECT OF ARTIFIAL LIFT METHODS FOR PETROLEUM PRODUCTION SYSTEM
4
03-06
31-03
14-17
04-07
02-05
12-15
04-07
28-31
05-08
03-06
14-17
05-08
8.500.000
19
PRODUCTION LOGGING
4
10-13
07-10
21-24
10-13
09-12
06-09
11-14
01-04
12-15
10-13
21-24
11-14
8.500.000
20
SUPPLY CHAIN MANAGEMENT IN THE UPSTREAM OIL & GAS INDUSTRY
3
18-20
15-17
29-31
19-21
22-24
19-21
19-21
14-16
20-22
18-20
29-01
27-29
6.500.000
21 22 23
WATER FLOODING WP&B, AFE and POD ARTIFICIAL LIFT
4 4 4
23-26 02-05 09-12
20-23 30-02 06-09
28-03 07-10 13-16
24-27 03-06 10-13
16-19 29-01 02-05
13-16 05-08 12-15
24-27 03-06 10-13
08-11 21-24 28-31
25-28 04-07 11-14
23-26 02-05 09-12
31-03 07-10 13-16
18-21 04-07 12-15
8.500.000 8.500.000 8.500.000
24
OFFSHORE WELLHEAD FUNCTION AND TROUBLESHOOTING
4
16-19
13-16
20-23
17-20
08-11
06-09
17-20
31-03
18-21
16-19
20-23
19-22
8.500.000
25
Advanced Oil and Gas Production System
4
16-19
13-16
13-16
17-20
02-05
12-15
17-20
28-31
18-21
16-19
13-16
18-21
8.950.000
26
BASIC DRILLING ENGINEERING AND HEALTH, SAFETY & ENVIRONMENTAL CONSIDERATION
4
23-26
20-23
20-23
24-27
08-11
05-08
24-27
31-03
25-28
23-26
20-23
04-07
8.950.000
27
Basic Petroleum Engineering
4
02-05
30-02
27-30
03-06
15-18
13-16
03-06
07-10
04-07
02-05
27-30
11-14
8.950.000
28
Basic Reservoir Engineering for Non Petroleum Engineer
4
09-12
06-09
27-02
10-13
29-01
06-09
10-13
21-24
11-14
09-12
30-02
19-22
8.950.000
29
ELECTRIC SUBMERSIBLE PUMP PRINCIPLES, INSTALLATION, OPERATION, MAINTENANCE AND TROUBLESHOOTING
4
24-27
21-24
14-17
25-28
09-12
05-08
25-28
01-04
26-29
24-27
14-17
12-15
8.950.000
19
30 31
FORMATION DAMAGE AND WELL STIMULATION NATURAL GAS RESERVOIR, PROCESSING AND ECONOMICS ASPECTS
4
03-06
31-03
21-24
04-07
16-19
13-16
04-07
08-11
05-08
03-06
21-24
18-21
8.950.000
4
10-13
07-10
28-31
10-13
30-02
06-09
11-14
22-25
12-15
10-13
28-01
04-07
8.950.000
32 33 34
Oil & Gas Production System OIL & GAS MEASUREMENT AND CALCULATION OIL AND GAS HANDLING FACILITIES
4 4 4
16-19 23-26 02-05
13-16 20-23 30-02
28-03 07-10 13-16
17-20 24-27 03-06
02-05 08-11 15-18
12-15 05-08 13-16
17-20 24-27 03-06
28-31 31-03 07-10
18-21 25-28 04-07
16-19 23-26 02-05
31-03 07-10 13-16
11-14 19-22 05-08
8.950.000 8.950.000 8.950.000
35
OIL AND GAS WELLS STIMULATION BY ACIDIZING AND HYDRAULIC FRACTURING
4
09-12
06-09
20-23
10-13
29-01
06-09
10-13
21-24
11-14
09-12
20-23
12-15
8.950.000
36
Oil Field, and 100 Methods to Maintain and Increase Production
4
17-20
14-17
27-30
18-21
02-05
12-15
18-21
28-31
19-22
17-20
27-30
18-21
8.950.000
37
PETROLEUM ENGINEERING FOR NON PETROLEUM ENGINEERS
4
24-27
21-24
27-02
25-28
09-12
05-08
25-28
01-04
26-29
24-27
30-02
04-07
8.950.000
38
PRODUCTION DOWNHOLE AND SUBSURFACE EQUIPMENTS
4
03-06
31-03
06-09
04-07
16-19
13-16
04-07
08-11
05-08
03-06
06-09
11-14
8.950.000
39
PRODUCTION OPERATION MANAGEMENT FOR MANAGERS
4
10-13
07-10
14-17
10-13
30-02
06-09
11-14
22-25
12-15
10-13
14-17
19-22
8.950.000
40
Pump Selection, Design and Operation for Oil and Gas Surface Production Facilities
4
16-19
13-16
21-24
17-20
02-05
12-15
17-20
28-31
18-21
16-19
21-24
05-08
8.950.000
41
SUCKER ROD PUMP DESIGN, OPERATION AND TROUBLESHOOTING
4
23-26
20-23
28-31
24-27
08-11
05-08
24-27
31-03
25-28
23-26
28-01
12-15
8.950.000
Surface Production Operation and Equipments WELL COMPLETION AND WORK OVER BLOWOUT PREVENTION AND WELL CONTROL ARUS MINYAK KORPORATE MODERN HYDROCARBON WELL PRODUCTION LOGGING DATA ANALYSIS AND INTERPRETATION OIL SPILL - OIL BOOM AND ENVIRONMENTAL MANAGEMENT
4 4 4 3
02-05 09-12 17-20 25-27
30-02 06-09 14-17 22-24
28-03 07-10 13-16 20-22
03-06 10-13 18-21 26-28
15-18 29-01 02-05 22-24
13-16 06-09 12-15 19-21
03-06 10-13 18-21 26-28
07-10 21-24 28-31 14-16
04-07 11-14 19-22 27-29
02-05 09-12 17-20 25-27
31-03 07-10 13-16 20-22
18-21 04-07 11-14 27-29
8.950.000 8.950.000 8.950.000 7.950.000
4
03-06
31-03
27-30
04-07
09-12
05-08
04-07
01-04
05-08
03-06
27-30
19-22
8.950.000
4
02-05
30-02
07-10
03-06
29-01
12-15
03-06
28-31
04-07
02-05
07-10
05-08
8.750.000
BASIC SURFACE SAFETY SYSTEM PETROLEUM FINANCE, COST CONTROL & RESERVOIR MANAJEMEN (Petroleum Economics) Gas, Oil and Water Pipeline Design and Maintenance
4
17-20
14-17
06-09
18-21
02-05
12-15
18-21
28-31
19-22
17-20
06-09
05-08
8.950.000
4
24-27
21-24
06-09
25-28
30-02
05-08
25-28
22-25
26-29
24-27
06-09
19-22
8.500.000
4
17-20
14-17
28-31
18-21
09-12
13-16
18-21
08-11
19-22
17-20
28-01
11-14
8.750.000
4
02-05
30-02
07-10
03-06
29-01
12-15
03-06
28-31
04-07
02-05
07-10
05-08
8.750.000
42 43 44 45 46 47 48 49 50
HSE 1
OIL SPILL - OIL BOOM AND ENVIRONMENTAL MANAGEMENT
20
2 3 4 5 6
BASIC SURFACE SAFETY SYSTEM GAS DISPERSION ANALYSIS WATER TREATMENT MANAJEMEN LINGKUNGAN AHLI HIGIENE INDUSTRI MADYA (HIMA)
4 3 4 4 5
17-20 09-11 16-19 02-05 16-20
14-17 06-08 13-16 30-02 13-17
06-09 27-01 20-23 27-02 06-10
18-21 10-12 17-20 03-06 17-21
02-05 22-24 08-11 08-11 08-12
12-15 19-21 13-16 05-08 12-16
18-21 10-12 17-20 03-06 17-21
28-31 31-02 07-10 07-10 07-11
19-22 11-13 18-21 04-07 18-22
17-20 09-11 16-19 02-05 16-20
06-09 30-01 20-23 30-02 06-10
05-08 27-29 19-22 11-14 18-22
8.950.000 6.950.000 8.750.000 7.950.000 8.950.000
7
AMDAL ( ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT) FOR EXECUTIVE
4
23-26
20-23
13-16
24-27
15-18
05-08
24-27
21-24
25-28
23-26
13-16
04-07
7.950.000
4 4
02-05 09-12
30-02 06-09
20-23 27-30
03-06 10-13
29-01 02-05
12-15 06-09
03-06 10-13
28-31 31-03
04-07 11-14
02-05 09-12
20-23 27-30
11-14 18-21
7.950.000 8.500.000
5
16-20
13-17
27-03
17-21
08-12
12-16
17-21
07-11
18-22
16-20
30-03
04-08
9.250.000
2
26-27
23-24
06-07
27-28
22-23
19-20
27-28
14-15
28-29
26-27
06-07
27-28
3.950.000
8 9 10 11
APPLIED ERGONOMICS AT WORKPLACE AUTHORISED GAS TESTING BASIC SAFETY ORIENTATION FOR CONTRACTORS CANTEEN HYGIENE
12
CONTRACTOR SAFETY MANAGEMENT SYSTEM (CSMS)
4
03-06
31-03
14-17
04-07
16-19
05-08
04-07
22-25
05-08
03-06
14-17
12-15
7.950.000
13 14 15
ELECTRICAL SAFETY HAZARD AND OPERABILITY STUDIES (HAZOPS) HEALTH IMPACT ASSESSMENT (HIA)
3 3 4
11-13 16-18 23-26
08-10 13-15 20-23
22-24 29-31 27-02
10-12 17-19 24-27
22-24 31-02 02-05
19-21 19-21 12-15
12-14 17-19 24-27
14-16 28-30 01-04
13-15 18-20 25-28
11-13 16-18 23-26
22-24 29-01 30-02
27-29 20-22 04-07
6.500.000 5.950.000 7.950.000
16
INCIDENT INVESTIGATION, PREVENTION AND PROACTIVE IMPROVEMENT
3
02-04
30-01
08-10
03-05
08-10
19-21
03-05
07-09
04-06
02-04
08-10
27-29
6.500.000
17 18 19 20 21 22 23 24
JOB SAFETY ANALYSIS (JSA) K3 RUMAH SAKIT LOCKOUT TAGOUT (LOTO) MANAGING SAFE WORK MATERIAL SAFETY DATA SHEETS (MSDS) MODERN SAFETY MANAGEMENT (MSM) OHSAS 180012007 AUDITOR OVERVIEW OF PROCESS SAFETY MANAGEMENT
2 2 2 4 2 4 5 2
09-10 19-20 26-27 03-06 11-12 16-19 23-27 02-03
06-07 16-17 23-24 31-03 08-09 13-16 20-24 30-31
13-14 20-21 27-28 28-03 06-07 14-17 20-24 29-30
12-13 20-21 27-28 04-07 10-11 17-20 24-28 03-04
15-16 22-23 29-30 02-05 11-12 16-19 29-02 23-24
19-20 08-09 15-16 05-08 20-21 12-15 05-09 19-20
10-11 20-21 27-28 04-07 12-13 17-20 24-28 03-04
14-15 21-22 30-31 31-03 10-11 22-25 31-04 15-16
11-12 21-22 28-29 05-08 13-14 18-21 25-29 04-05
09-10 19-20 26-27 03-06 11-12 16-19 23-27 02-03
13-14 20-21 27-28 31-03 06-07 14-17 20-24 29-30
11-12 18-19 27-28 05-08 13-14 19-22 04-08 28-29
3.950.000 3.950.000 3.950.000 7.950.000 3.950.000 7.950.000 9.250.000 3.950.000
25
PANITIA PEMBINA KESELAMATAN DAN KESEHATAN KERJA (P2K3)
4
10-13
07-10
27-02
10-13
02-05
13-16
11-14
28-31
12-15
10-13
30-02
12-15
7.950.000
26
PENERAPAN PENGENDALIAN BISING TERPADU DITEMPAT KERJA
3
18-20
15-17
08-10
19-21
08-10
19-21
19-21
07-09
20-22
18-20
08-10
18-20
6.500.000
27
PENGELOLAAN BAHAN KIMIA BERBAHAYA
3
23-25
20-22
13-15
24-26
15-17
05-07
24-26
14-16
25-27
23-25
13-15
27-29
5.950.000
28
PERLINDUNGAN LINGKUNGAN DAN PENGELOLAAN LIMBAH B3
4
03-06
31-03
20-23
04-07
29-01
12-15
04-07
21-24
05-08
03-06
20-23
04-07
7.950.000
29 30 31 32 33
PERMIT TO WORK (PTW) Process Hazard Analysis (PHA) Process Hazard Analysis (PHA) for Facilitator Process Safety Management PROJECT HSE MANAGEMENT
2 3 4 3 3
09-10 16-18 24-27 02-04 11-13
06-07 13-15 21-24 30-01 08-10
30-31 01-03 06-09 15-17 22-24
10-11 17-19 25-28 03-05 11-13
22-23 02-04 09-12 17-19 22-24
19-20 07-09 13-16 19-21 05-07
10-11 17-19 25-28 03-05 12-14
28-29 31-02 08-11 14-16 23-25
11-12 18-20 26-29 04-06 13-15
09-10 16-18 24-27 02-04 11-13
30-01 01-03 06-09 15-17 22-24
11-12 20-22 05-08 27-29 13-15
3.950.000 5.950.000 7.950.000 5.950.000 6.500.000
21
34 35 36 37 38 39 40 41
RISK ASSESSMENT AND OPTIMAL RISK MANAGEMENT BASED ON ISO 31000 SAFETY AUDITS AND SITE INSPECTION SAFETY OfficeR DEVELOPMENT PROGRAM SAFETY TRAINING FOR THE LABORATORY SELF CONTAINED BREATHING APPARATUS(SCBA) THE FUNDAMENTAL OF INDUSTRIAL HYGIENE WORKING AT HEIGHT PENERAPAN HACCP
2
19-20
16-17
27-28
20-21
01-02
12-13
20-21
30-31
21-22
19-20
27-28
18-19
3.950.000
3 5 3
23-25 02-06 09-11
20-22 30-03 06-08
27-01 06-10 13-15
24-26 03-07 10-12
03-05 08-12 15-17
19-21 05-09 14-16
24-26 03-07 10-12
02-04 07-11 14-16
25-27 04-08 11-13
23-25 02-06 09-11
30-01 06-10 13-15
27-29 04-08 11-13
5.950.000 9.250.000 6.500.000
1
16-16
13-13
20-20
17-17
22-22
19-19
17-17
21-21
18-18
16-16
20-20
20-20
2.950.000
5 2 4
23-27 12-13 17-20
20-24 09-10 14-17
27-31 06-07 14-17
24-28 12-13 18-21
29-02 08-09 16-19
05-09 20-21 05-08
24-28 13-14 18-21
31-04 07-08 22-25
25-29 14-15 19-22
23-27 12-13 17-20
27-01 06-07 14-17
04-08 14-15 19-22
9.250.000 3.950.000 7.950.000
42
IDENTIFICASI BAHAYA, PENILAIAN, PENGENDALIAN RESIKO (HIRAC) DAN ANALISA BAHAYA DIPEKERJAAN (JSA)
4
23-26
20-23
21-24
24-27
29-01
13-16
24-27
28-31
25-28
23-26
21-24
04-07
7.950.000
43 44 45 46
FIRE ALARMS & PROTECTION HAZARDOUS MATERIAL HANDLING INDUSTRIAL POLLUTION CONTROL JOB SAFETY ANALYSIS TRAINING
4 4 4 4
17-20 23-26 17-20 02-05
14-17 20-23 14-17 30-02
06-09 07-10 27-30 06-09
18-21 24-27 18-21 03-06
16-19 29-01 16-19 02-05
06-09 13-16 06-09 05-08
18-21 24-27 18-21 03-06
22-25 28-31 22-25 31-03
19-22 25-28 19-22 04-07
17-20 23-26 17-20 02-05
06-09 07-10 27-30 06-09
19-22 12-15 11-14 04-07
7.950.000 7.950.000 7.950.000 7.950.000
47
LINGKUNGAN KERJA YANG BERSIH DAN AMAN PADA INDUSTRI KIMIA
4
09-12
06-09
13-16
10-13
08-11
12-15
10-13
07-10
11-14
09-12
13-16
12-15
7.950.000
48
Water Treatment
4
10-13
07-10
27-02
10-13
09-12
12-15
11-14
08-11
12-15
10-13
30-02
18-21
7.950.000
49
AMDAL ( ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT) FOR EXECUTIVE
4
16-19
13-16
27-02
17-20
15-18
05-08
17-20
21-24
18-21
16-19
30-02
11-14
7.950.000
4
02-05
30-02
27-02
03-06
08-11
12-15
03-06
07-10
04-07
02-05
30-02
18-21
7.950.000
4
16-19
13-16
13-16
17-20
29-01
13-16
17-20
28-31
18-21
16-19
13-16
11-14
7.950.000
3 4 4
16-18 23-26 02-05
13-15 20-23 30-02
13-15 20-23 27-30
17-19 24-27 03-06
15-17 29-01 02-05
19-21 05-08 12-15
17-19 24-27 03-06
14-16 21-24 28-31
18-20 25-28 04-07
16-18 23-26 02-05
13-15 20-23 27-30
18-20 04-07 11-14
6.500.000 8.500.000 8.500.000
50 51 52 53 54
HUMAN RELIABILITY ASSESSMENT & ANALYSIS SYSTEM SAFETY ENGINEERING AND MANAGEMENT BEHAVIOR BASED SAFETY (BBS) HAZARD AND OPERABILITY STUDY ( HAZOPS ) HAZARDOUS MATERIALS SAFE HANDLING
55
HEALTH, SAFETY & ENVIRONMENT (HSE) ASPECTS IN LOGISTICS ACTIVITIES
4
09-12
06-09
27-02
10-13
08-11
06-09
10-13
31-03
11-14
09-12
30-02
19-22
8.500.000
56 57 58
Hot Works HSE MANAGEMENT SYSTEM HSE WORK PRACTICES AT CONFINED SPACE
3 4 3
18-20 24-27 04-06
15-17 21-24 01-03
06-08 14-17 22-24
19-21 25-28 05-07
22-24 16-19 22-24
19-21 13-16 19-21
19-21 25-28 05-07
07-09 22-25 14-16
20-22 26-29 06-08
18-20 24-27 04-06
06-08 14-17 22-24
27-29 05-08 27-29
6.500.000 8.500.000 6.500.000
59
JOB SAFETY ANALYSIS (JSA) ANALISA KESELAMATAN PEKERJAAN
3
11-13
08-10
29-31
10-12
31-02
19-21
12-14
28-30
13-15
11-13
29-01
13-15
6.500.000
60
MANAGING CONTRACTOR SAFETY
3
16-18
13-15
01-03
17-19
02-04
19-21
17-19
02-04
18-20
16-18
01-03
18-20
6.500.000
61
MODERN SAFETY AND LOSS CONTROL MANAGEMENT
4
23-26
20-23
07-10
24-27
09-12
05-08
24-27
08-11
25-28
23-26
07-10
04-07
8.500.000
62
OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENT (HSE) AUDITING
5
02-06
30-03
13-17
03-07
15-19
12-16
03-07
21-25
04-08
02-06
13-17
11-15
9.250.000
22
63
Occupational Health, Safety and Environment (HSE) on Paper and Pulp Industry
4
09-12
06-09
20-23
10-13
29-01
06-09
10-13
28-31
11-14
09-12
20-23
19-22
8.500.000
64
ONSHORE DRILLING SAFETY OPERATIONS HSE ASPECTS IN ONSHORE DRILLING OPERATIONS
4
17-20
14-17
27-30
18-21
02-05
12-15
18-21
31-03
19-22
17-20
27-30
05-08
8.500.000
65
ONSHORE DRILLING SAFETY OPERATIONS HSE ASPECTS IN ONSHORE DRILLING OPERATIONS FOR MANAGERS AND SUPERINTENDENTS
3
25-27
22-24
27-01
26-28
22-24
19-21
26-28
14-16
27-29
25-27
30-01
27-29
6.500.000
66
PENCEGAHAN DAN PENANGGULANGAN KEBAKARAN (FIRE PREVENTION & PROTECTION)
3
02-04
30-01
06-08
03-05
08-10
19-21
03-05
07-09
04-06
02-04
06-08
27-29
6.500.000
67
PRODUCTION SAFETY SYSTEM
5
09-13
06-10
13-17
17-21
15-19
05-09
10-14
21-25
11-15
09-13
13-17
11-15
8.500.000
68
PROFESSIONAL ACCIDENT INCIDENT INVESTIGATION
3
16-18
13-15
22-24
10-12
22-24
19-21
17-19
14-16
18-20
16-18
22-24
18-20
6.500.000
4
23-26
20-23
28-31
24-27
30-02
13-16
24-27
28-31
25-28
23-26
28-01
04-07
8.500.000
4
03-06
31-03
28-03
04-07
02-05
05-08
04-07
01-04
05-08
03-06
31-03
11-14
8.500.000
4 3 4
09-12 18-20 24-27
06-09 15-17 21-24
07-10 13-15 20-23
10-13 17-19 25-28
09-12 15-17 29-01
12-15 19-21 06-09
10-13 19-21 25-28
08-11 14-16 21-24
11-14 20-22 26-29
09-12 18-20 24-27
07-10 13-15 20-23
19-22 27-29 05-08
8.500.000 6.500.000 8.500.000
69 70 71 72 73
SAFETY MANAGEMENT FOR SUPERVISORS AND MANAGERS TRANSPORTATION SAFETY MANAGEMENT SYSTEM WAREHOUSE SAFETY MANAGEMENT HIRADC PROCESS SAFETY MANAGEMENT
74
Chemical Hazard Safety in Mining and Workplace
4
09-12
06-09
27-30
10-13
02-05
06-09
10-13
31-03
11-14
09-12
27-30
18-21
8.750.000
75 76 77 78 79 80 81 82
HAZARDOUS MATERIAL HANDLING HAZID (HAZARD IDENTIFICATON) HAZOPS(HAZARD AND OPERABILITY STUDIES) WASTE WATER TREATMENT & MANAGEMENT Water Treating and Chemicals PENGENDALIAN PENCEMARAN AIR PENGENDALIAN PENCEMARAN UDARA DUKUNGAN TEKNOLOGI BARU DAN MODERN
4 4 4 4 4 3 3 4
02-05 09-12 16-19 16-19 24-27 11-13 18-20 02-05
30-02 06-09 13-16 13-16 21-24 08-10 15-17 30-02
06-09 13-16 20-23 06-09 13-16 27-29 01-03 13-16
03-06 10-13 17-20 17-20 25-28 10-12 19-21 03-06
08-11 15-18 29-01 29-01 02-05 22-24 22-24 15-18
05-08 13-16 06-09 06-09 12-15 19-21 19-21 12-15
03-06 10-13 17-20 17-20 25-28 12-14 19-21 03-06
07-10 21-24 28-31 28-31 01-04 14-16 14-16 07-10
04-07 11-14 18-21 18-21 26-29 13-15 20-22 04-07
02-05 09-12 16-19 16-19 24-27 11-13 18-20 02-05
06-09 13-16 20-23 06-09 13-16 27-29 01-03 13-16
11-14 18-21 05-08 19-22 04-07 27-29 27-29 18-21
7.950.000 7.950.000 7.950.000 7.950.000 7.950.000 6.500.000 6.500.000 7.950.000
83
ISU PEMENUHAN KUALITAS DAN KEAMANAN PANGAN
4
09-12
06-09
20-23
10-13
29-01
05-08
10-13
21-24
11-14
09-12
20-23
04-07
7.950.000
4
16-19
13-16
27-30
17-20
02-05
13-16
17-20
28-31
18-21
16-19
27-30
11-14
7.950.000
4
23-26
20-23
27-02
24-27
08-11
06-09
24-27
31-03
25-28
23-26
30-02
19-22
7.950.000
4
02-05
30-02
20-23
03-06
02-05
12-15
03-06
28-31
04-07
02-05
20-23
18-21
8.500.000
4 2 2 2
23-26 09-10 16-17 23-24
20-23 06-07 13-14 20-21
27-02 06-07 13-14 20-21
24-27 10-11 17-18 24-25
02-05 22-23 23-24 22-23
13-16 19-20 20-21 19-20
24-27 10-11 17-18 24-25
28-31 14-15 15-16 14-15
25-28 11-12 18-19 25-26
23-26 09-10 16-17 23-24
30-02 06-07 13-14 20-21
18-21 27-28 28-29 27-28
7.950.000 3.950.000 3.950.000 4.500.000
84 85 86 87 88 89 90
PEMENUHAN PERSYARATAN PERIZINAN POTENSI DAN PERKEMBANGAN INDUSTRI PANGAN HSE MANAGEMENT SYSTEM INTERNAL AUDITOR PRODUCTION SYSTEM SAFETY FIT FOR DUTY SURVEILANS KESEHATAN PEKERJA APLIKASI PROGRAM PERLINDUNGAN
23
PERNAFASAN 91 92 93
FOOD HYGIENE SANITATION AND MONITORING HEARING CONSERVATION PROGRAM MENGELOLA KESEHATAN DI TEMPAT KERJA
2 2 2
02-03 11-12 18-19
30-31 08-09 15-16
27-28 27-28 08-09
03-04 12-13 19-20
23-24 22-23 23-24
20-21 19-20 20-21
03-04 12-13 19-20
15-16 14-15 15-16
04-05 13-14 20-21
02-03 11-12 18-19
27-28 30-31 08-09
28-29 27-28 28-29
4.500.000 4.500.000 4.500.000
94
CATERING SERVICE, HYGIENE & SANITATION (INCLUDING PERSONAL HYGIENE)
3
02-04
30-01
20-22
03-05
22-24
19-21
03-05
14-16
04-06
02-04
20-22
27-29
6.500.000
95
Penerapan Hazard Analysis Critical Control Point (HACCP) pada Pengelolaan Makanan
3
04-06
01-03
15-17
05-07
22-24
19-21
05-07
14-16
06-08
04-06
15-17
27-29
5.950.000
96 97 98 99
BEHAVIOR BASED SAFETY CSMS AWARENESS HSE LEADERSHIP INCIDENT INVESTIGATION
2 2 2 3
23-24 02-03 09-10 16-18
20-21 30-31 06-07 13-15
27-28 27-28 06-07 13-15
24-25 03-04 10-11 17-19
22-23 02-03 08-09 15-17
19-20 20-21 19-20 19-21
24-25 03-04 10-11 17-19
14-15 31-01 07-08 14-16
25-26 04-05 11-12 18-20
23-24 02-03 09-10 16-18
27-28 30-31 06-07 13-15
27-28 28-29 27-28 27-29
4.500.000 4.500.000 4.500.000 6.500.000
100
AMDAL (ENVIRONMENTAL IMPACT ASSESMENT) FOR EXECUTIVES
3
02-04
30-01
06-08
03-05
22-24
19-21
03-05
14-16
04-06
02-04
06-08
27-29
6.500.000
101
EMERGENCY PREPAREDNESS
3
09-11
06-08
13-15
10-12
22-24
19-21
10-12
14-16
11-13
09-11
13-15
27-29
6.500.000
102
ENVIRONMENTAL LEGISLATION (ANTICIPATING CONFLICS)
3
16-18
13-15
20-22
17-19
22-24
19-21
17-19
14-16
18-20
16-18
20-22
27-29
6.500.000
103
ENVIRONMENTAL MONITORING KEY TO POLUTION FREE
3
23-25
20-22
27-29
24-26
22-24
19-21
24-26
14-16
25-27
23-25
27-29
27-29
6.500.000
104
HSE AUDIT TECHNIQUES
3
04-06
01-03
27-01
05-07
22-24
19-21
05-07
14-16
06-08
04-06
30-01
27-29
6.500.000
105
OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENTAL IN THE OIL & GAS INDUSTRY
3
11-13
08-10
08-10
11-13
22-24
19-21
12-14
14-16
13-15
11-13
08-10
27-29
6.500.000
106
WASTE HANDLING & TREATMENT IN THE OIL & GAS INDUSTRIES
3
18-20
15-17
15-17
19-21
22-24
19-21
19-21
14-16
20-22
18-20
15-17
27-29
6.500.000
107
INDUSTRIAL HYGIENE (HIGIENE INDUSTRI)
3
23-25
20-22
20-22
24-26
22-24
19-21
24-26
14-16
25-27
23-25
20-22
27-29
6.950.000
108
HANDLING OF DANGEROUS GOODS IN AIR TRANSPORT
3
09-11
06-08
27-01
10-12
22-24
19-21
10-12
14-16
11-13
09-11
30-01
27-29
5.950.000
109
PRODUCTION SAFETY SYSTEM
4
17-20
14-17
14-17
18-21
30-02
06-09
18-21
28-31
19-22
17-20
14-17
11-14
7.950.000
110
SAFETY INSTRUMENTED SYSTEM (SIS) AND CONTROL
4
23-26
20-23
21-24
24-27
02-05
12-15
24-27
31-03
25-28
23-26
21-24
18-21
7.950.000
111
CATERING & ACCOMMODATION MANAGEMENT (INCLUDING TABLE MANNER)
4
23-26
20-23
13-16
24-27
29-01
05-08
24-27
21-24
25-28
23-26
13-16
04-07
7.950.000
WELDING SAFETY H2S AWARENESS Higiene Sanitasi Makanan Berbasis HACCP
2 3 2
02-03 04-06 09-10
30-31 01-03 06-07
02-03 20-22 27-28
03-04 05-07 10-11
02-03 22-24 29-30
12-13 19-21 05-06
03-04 05-07 10-11
28-29 14-16 28-29
04-05 06-08 11-12
02-03 04-06 09-10
02-03 20-22 27-28
27-28 27-29 11-12
3.950.000 5.950.000 4.500.000
3
16-18
13-15
20-22
17-19
22-24
19-21
17-19
21-23
18-20
16-18
20-22
18-20
5.950.000
112 113 114
MANAJEMEN 1
STRESS & CONFLICT MANAGEMENT
24
2
BAHAGIA DAN PRODUKTIF SAAT PURNA BAKTI
5
02-06
30-03
27-31
03-07
08-12
05-09
03-07
31-04
04-08
02-06
27-01
11-15
8.950.000
3
CORPORATE BUILIDNG DALAM MEMBANGUN KULTUR DAN ETIKA INTERNAL ORGANISASI
4
16-19
13-16
06-09
17-20
02-05
13-16
17-20
07-10
18-21
16-19
06-09
18-21
7.950.000
4
MODEL PEMBINAAN ANGGOTA YANG EXCELLENT DALAM DUNIA KERJA PERUSAHAAN
3
16-18
13-15
27-29
17-19
31-02
19-21
17-19
29-31
18-20
16-18
27-29
18-20
5.950.000
5
Office COMMUNICATION AND BEHAVIOR ETHIC
3
04-06
01-03
06-08
05-07
08-10
19-21
05-07
07-09
06-08
04-06
06-08
04-06
5.950.000
6
CHANGE & CONFLICT MANAGEMENT AND DEALING WITH DIFFICULT PEOPLE
2
16-17
13-14
20-21
17-18
22-23
19-20
17-18
14-15
18-19
16-17
20-21
27-28
3.950.000
7
SPEED AND INNOVATION
3
09-11
06-08
15-17
10-12
17-19
12-14
10-12
14-16
11-13
09-11
15-17
11-13
5.950.000
8
HYPNOTIC SELLING TECHNIQUE Menjual Tanpa Hambatan dengan Aplikasi Hypnosis dan NLP
2
09-10
06-07
27-28
10-11
23-24
20-21
10-11
15-16
11-12
09-10
30-31
28-29
3.950.000
9
CONTEMPORARY COMMUNICATION & LEADERSHIP
3
02-04
30-01
27-29
03-05
22-24
19-21
03-05
14-16
04-06
02-04
27-29
27-29
5.950.000
10
TALENT MANAGEMENT
4
03-06
31-03
28-31
04-07
29-01
05-08
04-07
28-31
05-08
03-06
28-01
05-08
7.950.000
11
COMMUNICATION, ASSERTIVENESS AND CONFLICT MANAGEMENT
2
12-13
09-10
29-30
12-13
22-23
19-20
13-14
30-31
14-15
12-13
29-30
14-15
3.950.000
4
23-26
20-23
13-16
24-27
15-18
12-15
24-27
21-24
25-28
23-26
13-16
04-07
7.950.000
4
24-27
21-24
06-09
25-28
30-02
05-08
25-28
22-25
26-29
24-27
06-09
19-22
8.500.000
3
02-04
30-01
27-29
03-05
22-24
19-21
03-05
28-30
04-06
02-04
27-29
27-29
6.500.000
12 13 14
INNER SUCCESS TRAINING PETROLEUM FINANCE, COST CONTROL & RESERVOIR MANAJEMEN (Petroleum Economics) ENGINEERING MATERIAL KNOWLEDGE FOR WAREHOUSE PEOPLE
15
CULTURE CHANGE FOR MAINTENANCE AND RELIABILITY IMPROVEMENT
3
09-11
06-08
27-29
10-12
29-31
05-07
10-12
28-30
11-13
09-11
27-29
11-13
6.500.000
16
CATERING & ACCOMMODATION MANAGEMENT (INCLUDING TABLE MANNER)
4
23-26
20-23
13-16
24-27
29-01
05-08
24-27
21-24
25-28
23-26
13-16
04-07
7.950.000
17 18 19 20
LIFE CYCLE COSTING ACCOUNT RECEIVABLE MANAGEMENT Accounting Information Systems Asset Management
3 2 3 3
16-18 09-10 16-18 23-25
13-15 06-07 13-15 20-22
27-01 27-28 27-01 06-08
17-19 10-11 17-19 24-26
02-04 29-30 02-04 08-10
12-14 05-06 12-14 19-21
17-19 10-11 17-19 24-26
31-02 28-29 31-02 07-09
18-20 11-12 18-20 25-27
16-18 09-10 16-18 23-25
30-01 27-28 30-01 06-08
18-20 11-12 18-20 27-29
6.500.000 3.950.000 5.950.000 5.950.000
21
BALANCED SCORECARD (BSC) CONCEPT AND IMPLEMENTATION
2
02-03
30-31
13-14
03-04
15-16
07-08
03-04
14-15
04-05
02-03
13-14
04-05
3.950.000
22 23
BASIC ACCOUNTING BASIC AUDIT FINANCE
3 3
11-13 18-20
08-10 15-17
20-22 29-31
11-13 19-21
22-24 31-02
14-16 19-21
12-14 19-21
21-23 29-31
13-15 20-22
11-13 18-20
20-22 29-01
13-15 20-22
5.950.000 5.950.000
3
25-27
22-24
01-03
26-28
03-05
07-09
26-28
02-04
27-29
25-27
01-03
27-29
5.950.000
3
04-06
01-03
08-10
05-07
10-12
12-14
05-07
09-11
06-08
04-06
08-10
06-08
5.950.000
3 3
09-11 16-18
06-08 13-15
15-17 22-24
10-12 17-19
17-19 22-24
19-21 05-07
10-12 17-19
14-16 23-25
11-13 18-20
09-11 16-18
15-17 22-24
11-13 18-20
5.950.000 5.950.000
24 25 26 27
BASIC KNOWLEDGE ABOUT FINANCIAL MANAGEMENT BUDGET PLANNING, CONTROLLING & ANALYSING BUDGETING AND PROJECT COST CONTROL BUDGETING AND REPORTING
25
28 29 30
CASH MANAGEMENT CUSTOMER RELATION MANAGEMENT(CRM) Export import
2 3 3
23-24 18-20 16-18
20-21 15-17 13-15
27-28 13-15 08-10
24-25 19-21 17-19
29-30 15-17 10-12
15-16 12-14 19-21
24-25 19-21 17-19
28-29 14-16 09-11
25-26 20-22 18-20
23-24 18-20 16-18
27-28 13-15 08-10
27-28 20-22 18-20
3.950.000 5.950.000 5.950.000
31
FINANCE FOR NON FINANCE FOR OIL & GAS INDUSTRY
3
25-27
22-24
15-17
26-28
17-19
07-09
26-28
14-16
27-29
25-27
15-17
27-29
5.950.000
32 33
FINANCE FOR NON FINANCE MANAGER Financial Planning and Budgeting for Banking
3 3
04-06 11-13
01-03 08-10
22-24 29-31
05-07 11-13
22-24 31-02
12-14 19-21
05-07 12-14
23-25 28-30
06-08 13-15
04-06 11-13
22-24 29-01
06-08 13-15
5.950.000 5.950.000
34
Holistic CSR and Sustainable Community Development
2
19-20
16-17
02-03
20-21
02-03
05-06
20-21
03-04
21-22
19-20
02-03
21-22
3.950.000
35 36 37
HR Based On Competency for Recruitment INTERMEDIATE ACCOUNTING Key Account Management
2 3 2
02-03 09-11 16-17
30-31 06-08 13-14
13-14 20-22 27-28
03-04 10-12 17-18
15-16 22-24 29-30
19-20 07-09 12-13
03-04 10-12 17-18
14-15 21-23 30-31
04-05 11-13 18-19
02-03 09-11 16-17
13-14 20-22 27-28
04-05 11-13 18-19
3.950.000 5.950.000 3.950.000
38
LAPORAN KEUANGAN PEMAHAMAN DAN PENGGUNAANNYA
3
25-27
22-24
27-01
26-28
03-05
19-21
26-28
31-02
27-29
25-27
30-01
27-29
5.950.000
3 3
04-06 11-13
01-03 08-10
08-10 15-17
05-07 11-13
10-12 17-19
05-07 14-16
05-07 12-14
09-11 14-16
06-08 13-15
04-06 11-13
08-10 15-17
06-08 13-15
5.950.000 5.950.000
2
18-19
15-16
23-24
19-20
22-23
19-20
19-20
24-25
20-21
18-19
23-24
20-21
3.950.000
4
02-05
30-02
28-03
03-06
02-05
12-15
03-06
01-04
04-07
02-05
31-03
04-07
7.950.000
39 40 41 42
Managing Training Function OUTSOURCING MANAGEMENT PETTY CASH MANAGEMENT & ADMINISTRATION PROBLEM SOLVING AND DECISION MAKING
43
PROFIT PLANNING COST - VOLUME - PROFIT RELATIONSHIP ANALYSIS
3
09-11
06-08
06-08
10-12
08-10
19-21
10-12
07-09
11-13
09-11
06-08
11-13
5.950.000
44
Project Cost Estimation & Cost Control
3
18-20
15-17
13-15
19-21
15-17
05-07
19-21
14-16
20-22
18-20
13-15
20-22
5.950.000
45
Standard Operational Procedure, Accounting & Finance
3
25-27
22-24
20-22
26-28
22-24
14-16
26-28
21-23
27-29
25-27
20-22
27-29
5.950.000
46
Total Quality Management
3
16-18
13-15
08-10
17-19
10-12
12-14
17-19
09-11
18-20
16-18
08-10
18-20
5.950.000
47
TRAINING EVALUATION AND MEASUREMENT METHOD
2
23-24
20-21
16-17
24-25
18-19
20-21
24-25
14-15
25-26
23-24
16-17
27-28
3.950.000
48
TRAINING NEED ANALYSIS
2
02-03
30-31
23-24
03-04
22-23
05-06
03-04
24-25
04-05
02-03
23-24
04-05
3.950.000
49
Training untuk pegawai persiapan masa pensiun (training pra-purnabakti)
5
09-13
06-10
27-31
17-21
29-02
12-16
10-14
31-04
11-15
09-13
27-01
11-15
8.950.000
2 3 3 3
19-20 25-27 04-06 09-11
16-17 22-24 01-03 06-08
01-02 06-08 13-15 20-22
10-11 26-28 05-07 11-13
04-05 08-10 15-17 22-24
19-20 07-09 12-14 19-21
20-21 26-28 05-07 10-12
28-29 07-09 14-16 21-23
21-22 27-29 06-08 11-13
19-20 25-27 04-06 09-11
01-02 06-08 13-15 20-22
21-22 27-29 06-08 11-13
3.950.000 5.950.000 5.950.000 5.950.000
3
16-18
13-15
27-29
17-19
29-31
05-07
17-19
29-31
18-20
16-18
27-29
18-20
5.950.000
3
23-25
20-22
01-03
24-26
02-04
14-16
24-26
31-02
25-27
23-25
01-03
27-29
5.950.000
50 51 52 53 54 55
ACCOUNT PAYABLE MANAGEMENT COST ACCOUNTING FIXED ASSET ANALISIS KEEKONOMISAN PROYEK SISTEM INFORMASI MANAJEMEN DAN AKUNTANSI COST VOLUME PROFIT ANALYSIS
56
INTERNATIONAL FINANCIAL REPORTING STANDARD (IFRS)
2
02-03
30-31
09-10
03-04
11-12
19-20
03-04
10-11
04-05
02-03
09-10
04-05
4.500.000
57
TREASURY AND CASH FLOW MANAGEMENT
2
12-13
09-10
16-17
10-11
18-19
08-09
13-14
14-15
14-15
12-13
16-17
14-15
4.500.000
26
58 59 60 61 62 63 64 65 66 67 68 69 70 71 72
ADVANCE SECURITY MANAGEMENT ANALISIS BEBAN KERJA ANALITYCAL HIERARCHY PROCESS IMPLEMENTASI BALANCED SCORE CARD (BSC) SEBAGAI ALAT UKUR PERFORMANSI KARYAWAN KESEIMBANGAN LINTAS PRODUKSI (LINE BALANCING)
4 2 2
09-12 09-10 16-17
06-09 06-07 13-14
13-16 20-21 27-28
10-13 10-11 17-18
29-01 22-23 29-30
05-08 12-13 19-20
10-13 10-11 17-18
21-24 21-22 28-29
11-14 11-12 18-19
09-12 09-10 16-17
13-16 20-21 27-28
11-14 11-12 18-19
7.950.000 3.950.000 3.950.000
3
02-04
30-01
06-08
03-05
08-10
14-16
03-05
07-09
04-06
02-04
06-08
04-06
5.950.000
2
11-12
08-09
13-14
12-13
15-16
20-21
12-13
14-15
13-14
11-12
13-14
13-14
3.950.000
LIFE CYCLE COSTING (WHOLE LIFE COSTING) MANAJEMEN KOMPENSASI BERBASIS KINERJA MANAJEMEN LOGISTIK MANAJEMEN PENGEMBANGAN PRODUK MANAJEMEN PERGUDANGAN DAN PERSEDIAAN MANAJEMEN PROYEK OPERATION MANAGEMENT PEMILIHAN PEMASOK (VENDOR) STANDARD OPERATING PROCEDURE STUDI KELAYAKAN PROYEK
2 2 3 3
18-19 25-26 04-06 11-13
15-16 22-23 01-03 08-10
22-23 29-30 01-03 08-10
19-20 26-27 05-07 10-12
23-24 31-01 03-05 10-12
07-08 12-13 19-21 07-09
19-20 26-27 05-07 12-14
23-24 30-31 02-04 09-11
20-21 27-28 06-08 13-15
18-19 25-26 04-06 11-13
22-23 29-30 01-03 08-10
20-21 28-29 06-08 13-15
3.950.000 3.950.000 5.950.000 5.950.000
2
19-20
16-17
15-16
20-21
17-18
14-15
20-21
15-16
21-22
19-20
15-16
21-22
3.950.000
3 2 2 2 2
25-27 02-03 09-10 23-24 04-05
22-24 30-31 06-07 20-21 01-02
22-24 30-31 27-28 16-17 20-21
26-28 03-04 12-13 24-25 05-06
22-24 01-02 02-03 18-19 22-23
19-21 05-06 15-16 07-08 12-13
26-28 03-04 10-11 24-25 05-06
23-25 28-29 31-01 14-15 21-22
27-29 04-05 11-12 25-26 06-07
25-27 02-03 09-10 23-24 04-05
22-24 30-01 30-31 16-17 20-21
27-29 04-05 11-12 27-28 06-07
5.950.000 3.950.000 3.950.000 3.950.000 3.950.000
73
TANGGUNG JAWAB SOSIAL PERUSAHAAN (CORPORATE SOCIAL RESPONSIBILITY)
2
11-12
08-09
27-28
10-11
29-30
20-21
12-13
30-31
13-14
11-12
27-28
13-14
3.950.000
74 75 76 77 78 79 80
VALUE ENGINEERING (REKAYASA NILAI) Sistem Informasi manajemen Pergudangan Sistem Life Cycle Costing ANALISIS KEPUTUSAN MANAJEMEN PRODUKSI METODE PENGAMBILAN KEPUTUSAN BUSINESS PROCESS REENGINEERING
2 2 2 2 2 2 2
18-19 25-26 05-06 12-13 19-20 26-27 16-17
15-16 22-23 02-03 09-10 16-17 23-24 13-14
01-02 08-09 13-14 22-23 29-30 02-03 27-28
19-20 26-27 06-07 12-13 20-21 27-28 17-18
04-05 10-11 15-16 23-24 31-01 02-03 23-24
08-09 14-15 19-20 05-06 15-16 20-21 20-21
19-20 26-27 06-07 13-14 20-21 27-28 17-18
02-03 09-10 15-16 23-24 28-29 03-04 15-16
20-21 27-28 07-08 14-15 21-22 28-29 18-19
18-19 25-26 05-06 12-13 19-20 26-27 16-17
01-02 08-09 13-14 22-23 29-30 02-03 27-28
20-21 28-29 07-08 14-15 21-22 27-28 28-29
3.950.000 3950000 3950000 3.950.000 3.950.000 3.950.000 3.950.000
81
LOGISTICS AND SUPPLY CHAIN MANAGEMENT CONCEPT, STRATEGY AND IMPLEMENTATION
4
02-05
30-02
06-09
03-06
08-11
05-08
03-06
07-10
04-07
02-05
06-09
11-14
7.950.000
3
11-13
08-10
13-15
11-13
15-17
19-21
12-14
14-16
13-15
11-13
13-15
27-29
5.950.000
2
18-19
15-16
22-23
19-20
23-24
19-20
19-20
21-22
20-21
18-19
22-23
18-19
3.950.000
82 83
MANAJEMEN STRATEGI PRACTICAL PROJECT EVALUATION AND FINANCING
84
PROJECT MANAGEMENT WITH MICROSOFT PROJECT APPLICATION,Win QSB & MONTE CARLO SIMULATION
3
25-27
22-24
29-31
26-28
29-31
19-21
26-28
28-30
27-29
25-27
29-01
27-29
5.950.000
85 86 87 88
RISK-BASED MANAGEMENT STRATEGI PENGEMBANGAN BISNIS SUPPLY CHAIN MANAGEMENT LOGISTIC AND SUPPLY CHAIN MANAGEMENT
3 3 3 4
04-06 09-11 18-20 09-12
01-03 06-08 15-17 06-09
01-03 08-10 15-17 27-02
05-07 10-12 19-21 10-13
02-04 10-12 17-19 02-05
19-21 12-14 19-21 05-08
05-07 10-12 19-21 10-13
31-02 09-11 14-16 31-03
06-08 11-13 20-22 11-14
04-06 09-11 18-20 09-12
01-03 08-10 15-17 30-02
04-06 13-15 20-22 11-14
5.950.000 5.950.000 5.950.000 7.950.000
27
89 90 91 92 93
PROJECT MANAGEMENT ACCOUNT OfficeR AUDITING SDM BUSINESS STRATEGY FOR MANAGERS COSTUMER SERVICE(CS)
4 3 3 3 3
10-13 23-25 09-11 25-27 18-20
07-10 20-22 06-08 22-24 15-17
28-31 06-08 20-22 27-01 22-24
10-13 24-26 10-12 26-28 19-21
02-05 22-24 22-24 02-04 22-24
05-08 19-21 19-21 05-07 07-09
11-14 24-26 10-12 26-28 19-21
01-04 14-16 21-23 31-02 23-25
12-15 25-27 11-13 27-29 20-22
10-13 23-25 09-11 25-27 18-20
28-01 06-08 20-22 30-01 22-24
19-22 27-29 11-13 27-29 20-22
7.950.000 5.950.000 5.950.000 5.950.000 5.950.000
94
KEPEMIMPINAN (LEADERSHIP HIGH LEVEL MANAGER)
5
09-13
06-10
06-10
17-21
08-12
05-09
10-14
07-11
11-15
09-13
06-10
11-15
8.950.000
95
KEPEMIMPINAN (LEADERSHIP LOWER LEVEL MANAGER)
3
16-18
13-15
13-15
10-12
15-17
12-14
17-19
14-16
18-20
16-18
13-15
18-20
5.950.000
96
KEPEMIMPINAN (LEADERSHIP MIDDLE LEVEL MANAGER)
4
24-27
21-24
20-23
25-28
29-01
05-08
25-28
21-24
26-29
24-27
20-23
04-07
7.950.000
97
KEWIRANIAGAAN (SALESMANSHIP)
3
04-06
01-03
27-29
05-07
22-24
19-21
05-07
28-30
06-08
04-06
27-29
27-29
5.950.000
98
MANAJEMEN PERUBAHAN (CHANGE MANAGEMENT)
3
09-11
06-08
27-01
11-13
02-04
14-16
10-12
31-02
11-13
09-11
30-01
11-13
5.950.000
99
MANAJEMEN SDM (PERSONALIA ATAU TENAGA KERJA)
5
16-20
13-17
06-10
17-21
08-12
05-09
17-21
07-11
18-22
16-20
06-10
18-22
8.950.000
100
MANAJEMEN PERILAKU DALAM ORGANISASI(MANAGEMENT OF ORGANIZATION BEHAVIOR)
4
23-26
20-23
14-17
24-27
16-19
12-15
24-27
22-25
25-28
23-26
14-17
05-08
7.950.000
101 102
MANAJEMEN STRATEGI MANUSIA DALAM KERJA (MEN IN WORK)
5 2
02-06 12-13
30-03 09-10
20-24 30-31
03-07 10-11
29-02 22-23
05-09 19-20
03-07 13-14
31-04 14-15
04-08 14-15
02-06 12-13
20-24 30-01
11-15 27-28
8.950.000 3.950.000
4
16-19
13-16
28-03
17-20
02-05
13-16
17-20
28-31
18-21
16-19
31-03
18-21
7.950.000
4
24-27
21-24
06-09
25-28
08-11
05-08
25-28
07-10
26-29
24-27
06-09
04-07
7.950.000
2
23-24
20-21
27-28
24-25
02-03
20-21
24-25
31-01
25-26
23-24
30-31
27-28
3.950.000
3 3 4 3 3 5
25-27 02-04 24-27 23-25 04-06 16-20
22-24 30-01 21-24 20-22 01-03 13-17
29-31 01-03 13-16 08-10 15-17 27-31
26-28 03-05 25-28 24-26 05-07 17-21
29-31 03-05 15-18 08-10 17-19 29-02
05-07 14-16 05-08 07-09 14-16 05-09
26-28 03-05 25-28 24-26 05-07 17-21
29-31 02-04 22-25 09-11 14-16 31-04
27-29 04-06 26-29 25-27 06-08 18-22
25-27 02-04 24-27 23-25 04-06 16-20
29-01 01-03 13-16 08-10 15-17 27-01
27-29 04-06 05-08 27-29 04-06 18-22
5.950.000 5.950.000 7.950.000 5.950.000 5.950.000 8.500.000
103 104 105 106 107 108 109 110 111
MENINGKATKAN EFEKTIVITAS FUNGSI SUPERVISOR(SUPERVISORY MANAGEMENT) PENGANTAR KONSEP MANAJEMEN(INTRODUCTION TO MANAGEMENT) RAPAT YANG PRODUKTIF (PRODUCTIVE MEETING) TEAM DEVELOPMENT TEKNIK NEGOSIASI CUSTOMER SERVICE EXCELLENCE STRATEGY GOOD CORPORATE GOVERNANCE HOW TO IMPROVE BUSINESS PERFORMANCE KEMADYAAN
112
MANAGEMENT PROJECT STRATEGI DAN IMPLEMENTASI
4
24-27
21-24
27-02
25-28
02-05
12-15
25-28
28-31
26-29
24-27
30-02
05-08
7.950.000
113 114 115 116
MANAJEMEN OPERASI – PRODUKSI PERFORMANCE MANAGEMENT SIX SIGMA CHAMPIONS HANDLING CUSTOMER COMPLAINT
3 3 4 2
02-04 11-13 16-19 05-06
30-01 08-10 13-16 02-03
06-08 13-15 21-24 02-03
03-05 11-13 17-20 06-07
10-12 15-17 29-01 02-03
19-21 05-07 13-16 08-09
03-05 12-14 17-20 06-07
07-09 14-16 22-25 31-01
04-06 13-15 18-21 07-08
02-04 11-13 16-19 05-06
06-08 13-15 21-24 02-03
27-29 11-13 18-21 04-05
5.950.000 5.950.000 7.950.000 3.950.000
28
117
PELAYANAN PRIMA BAGI APARATUR PEMERINTAHAN
3
09-11
06-08
08-10
10-12
08-10
12-14
10-12
09-11
11-13
09-11
08-10
13-15
5.950.000
118 119 120 121 122 123 124 125 126 127 128 129 130 131
MARKETING MANAGEMENT MANAJEMEN PERPUSTAKAAN COST CONTROL AND ESTIMATING FEASIBILITY STUDY & PROJECT EVALUATION MATERIAL MANAGEMENT Office MANAGEMENT AND FILING SYSTEM QA & QC Inspection Program CONTEMPORARY LEADERSHIP CUSTOMER SERVICE IN CREDIT UNION KEWIRAUSAHAAN PRA PURNA BAKTI MOSSAD STRATEGY ON BUSINESS PERSUASIVE MARKETING PSYCHO-SPIRITUALITY IN ENTREPRENEURSHIP MANAJEMEN PERPAJAKAN
4 3 4 4 4 4 3 3 3 4 3 3 3 3
24-27 02-04 09-12 10-13 17-20 09-12 18-20 09-11 16-18 23-26 25-27 18-20 23-25 02-04
21-24 30-01 06-09 07-10 14-17 06-09 15-17 06-08 13-15 20-23 22-24 15-17 20-22 30-01
20-23 29-31 07-10 27-02 14-17 27-02 20-22 27-01 06-08 07-10 27-01 22-24 29-31 27-01
25-28 03-05 10-13 10-13 18-21 10-13 19-21 10-12 17-19 24-27 26-28 19-21 24-26 03-05
30-02 22-24 08-11 09-12 16-19 08-11 22-24 22-24 08-10 09-12 03-05 22-24 29-31 22-24
13-16 19-21 12-15 12-15 06-09 12-15 19-21 19-21 19-21 12-15 19-21 19-21 19-21 19-21
25-28 03-05 10-13 11-14 18-21 10-13 19-21 10-12 17-19 24-27 26-28 19-21 24-26 03-05
28-31 14-16 07-10 08-11 22-25 07-10 14-16 14-16 07-09 08-11 02-04 21-23 28-30 14-16
26-29 04-06 11-14 12-15 19-22 11-14 20-22 11-13 18-20 25-28 27-29 20-22 25-27 04-06
24-27 02-04 09-12 10-13 17-20 09-12 18-20 09-11 16-18 23-26 25-27 18-20 23-25 02-04
20-23 29-01 07-10 30-02 14-17 30-02 20-22 30-01 06-08 07-10 30-01 22-24 29-01 30-01
05-08 27-29 05-08 12-15 04-07 05-08 27-29 27-29 27-29 11-14 27-29 20-22 27-29 27-29
7.950.000 5.950.000 7.950.000 7.950.000 7.950.000 7.950.000 6.500.000 5.950.000 5.950.000 8.500.000 5.950.000 5.950.000 5.950.000 5.950.000
132
INDONESIA TAX OUTLOOK 2015-2016 DAN TAX AMNESTY
2
09-10
06-07
06-07
10-11
22-23
19-20
10-11
14-15
11-12
09-10
06-07
27-28
4.500.000
133 134
CUSTOMER LOYALITY STRATEGY Crisis Management
3 3
23-25 23-25
20-22 20-22
20-22 20-22
24-26 24-26
22-24 22-24
19-21 19-21
24-26 24-26
14-16 14-16
25-27 25-27
23-25 23-25
20-22 20-22
27-29 27-29
5950000 5.950.000
135
INTERVIEWING SKILL FOR RECRUITMENT PROMOTION
3
02-04
30-01
27-29
03-05
22-24
19-21
03-05
14-16
04-06
02-04
27-29
27-29
5.950.000
136
QUALITY MANAGEMENT SYSTEM ISO 9001 2008 STANDARD (SISTEM MANAJEMEN MUTU)
3
09-11
06-08
27-01
10-12
22-24
19-21
10-12
14-16
11-13
09-11
30-01
27-29
5.950.000
3 3
16-18 25-27
13-15 22-24
06-08 13-15
17-19 26-28
22-24 22-24
19-21 19-21
17-19 26-28
14-16 14-16
18-20 27-29
16-18 25-27
06-08 13-15
27-29 27-29
5.950.000 5.950.000
2
05-06
02-03
23-24
06-07
22-23
19-20
06-07
14-15
07-08
05-06
23-24
27-28
3.950.000
3 3
11-13 18-20
08-10 15-17
29-31 01-03
11-13 19-21
29-31 02-04
19-21 19-21
12-14 19-21
28-30 31-02
13-15 20-22
11-13 18-20
29-01 01-03
27-29 18-20
5.950.000 5.950.000
137 138 139 140 141
SECURITY MANAGEMENT SYSTEM BASIC LEADERSHIP DINAMIKA SERIKAT PEKERJA DALAM PERUSAHAAN TERKAIT MENGHADAPI ERA GLOBALISASI HOUR OF CHANGE MANAGEMENT HUBUNGAN INDUSTRIAL KEPEGAWAIAN
142
HUKUM KEIMIGRASIAN TERKAIT PEMBERIAN IJIN MEMPERKERJAKAN TENAGA KERJA ASING
3
23-25
20-22
08-10
24-26
08-10
19-21
24-26
07-09
25-27
23-25
08-10
27-29
5.950.000
143 144 145 146 147 148 149
LOBBYING AND SCHEDULLING MAN POWER PLANNING PROBLEM SOLVING & DECISION MAKING STRATEGI MEMBANGUN IMAGE CORPORATE TRANSFORMATION LEADERSHIP MANAJEMEN RESIKO INTELLIGENT AND INVESTIGATION SKILLS
3 3 3 3 3 3 3
02-04 09-11 16-18 25-27 04-06 11-13 18-20
30-01 06-08 13-15 22-24 01-03 08-10 15-17
15-17 20-22 27-29 27-01 06-08 13-15 22-24
03-05 10-12 17-19 26-28 05-07 11-13 19-21
15-17 22-24 31-02 03-05 10-12 17-19 22-24
19-21 19-21 05-07 12-14 19-21 07-09 14-16
03-05 10-12 17-19 26-28 05-07 12-14 19-21
14-16 21-23 29-31 02-04 09-11 14-16 23-25
04-06 11-13 18-20 27-29 06-08 13-15 20-22
02-04 09-11 16-18 25-27 04-06 11-13 18-20
15-17 20-22 27-29 30-01 06-08 13-15 22-24
04-06 11-13 20-22 27-29 06-08 13-15 18-20
5.950.000 5.950.000 5.950.000 5.950.000 5.950.000 5.950.000 5.950.000
29
150 151 152 153 154 155 156
ASSET SECURITY MANAGEMENT GENERAL AFFAIRS MANAGEMENT SYSTEM MEASURING CUSTOMER SATISFACTION CREATIVE ACCOUNTING DAN DISCLOSURE PENCEGAHAN FRAUD DAN INVESTIGATIF ASSET MANAGEMENT ASSET MANAGEMENT BERBASIS ICT
3 3 3 3 3 3 3
23-25 02-04 09-11 16-18 23-25 09-11 16-18
20-22 30-01 06-08 13-15 20-22 06-08 13-15
29-31 01-03 08-10 20-22 27-29 27-29 27-01
24-26 03-05 10-12 17-19 24-26 10-12 17-19
29-31 02-04 08-10 22-24 22-24 22-24 02-04
19-21 05-07 12-14 19-21 19-21 19-21 19-21
24-26 03-05 10-12 17-19 24-26 10-12 17-19
28-30 31-02 07-09 14-16 14-16 14-16 31-02
25-27 04-06 11-13 18-20 25-27 11-13 18-20
23-25 02-04 09-11 16-18 23-25 09-11 16-18
29-01 01-03 08-10 20-22 27-29 27-29 30-01
27-29 04-06 11-13 27-29 27-29 27-29 18-20
5.950.000 5.950.000 5.950.000 5.950.000 5.950.000 5.950.000 5.950.000
157
DOCUMENT CONTROL ( VERIFICATION AND CLASSIFICATION )
3
23-25
20-22
06-08
24-26
08-10
19-21
24-26
07-09
25-27
23-25
06-08
27-29
5.950.000
158
DOCUMENT MANAGEMENT SYSTEM AND ELECTRONIC FILING
3
04-06
01-03
13-15
05-07
15-17
05-07
05-07
14-16
06-08
04-06
13-15
04-06
5.950.000
159
MANAGEMENT INFORMATION SYSTEM
3
11-13
08-10
22-24
11-13
22-24
12-14
12-14
21-23
13-15
11-13
22-24
11-13
5.950.000
160
MANAGEMENT OF DOCUMENT CONTROL & MODERN LIBRARY
3
18-20
15-17
29-31
19-21
29-31
19-21
19-21
28-30
20-22
18-20
29-01
20-22
5.950.000
161
Office MANAGEMENT AND ELECTRONIC FILING SYSTEM
3
25-27
22-24
01-03
26-28
03-05
07-09
26-28
02-04
27-29
25-27
01-03
27-29
5.950.000
162 163 164 165
Office MODERN FILING MANAGEMENT EFFECTIVE REPORT WRITING TECHNIQUE Office AUTOMATION SKILL TATACARA PENYUSUNAN SILABUS DIKLAT
3 3 3 3
02-04 09-11 16-18 23-25
30-01 06-08 13-15 20-22
08-10 15-17 20-22 27-29
03-05 10-12 17-19 24-26
10-12 17-19 22-24 31-02
14-16 19-21 05-07 12-14
03-05 10-12 17-19 24-26
09-11 14-16 23-25 29-31
04-06 11-13 18-20 25-27
02-04 09-11 16-18 23-25
08-10 15-17 20-22 27-29
06-08 13-15 18-20 27-29
5.950.000 5.950.000 5.950.000 5.950.000
166
COMERCIAL CONTRACT DRAFTING AND MANAGEMENT
3
23-25
20-22
27-29
24-26
22-24
19-21
24-26
14-16
25-27
23-25
27-29
27-29
5.950.000
167 168 169 170
CONTRACT MANAGEMENT Cost control Creative Problem Solving Effective Business Letters Writing
3 3 4 3
09-11 18-20 24-27 04-06
06-08 15-17 21-24 01-03
06-08 13-15 21-24 29-31
10-12 19-21 25-28 05-07
08-10 15-17 29-01 22-24
19-21 19-21 05-08 19-21
10-12 19-21 25-28 05-07
07-09 14-16 21-24 28-30
11-13 20-22 26-29 06-08
09-11 18-20 24-27 04-06
06-08 13-15 21-24 29-01
27-29 27-29 04-07 27-29
5.950.000 5.950.000 7.950.000 5.950.000
171
Effective Inventory Management and Modern Warehousing for Support Personal
4
10-13
07-10
28-03
10-13
02-05
13-16
11-14
01-04
12-15
10-13
31-03
11-14
7.950.000
172 173
Excellent Supervisory Integrated and Effective Logistic Management
4 4
02-05 17-20
30-02 14-17
20-23 27-02
03-06 18-21
30-02 02-05
06-09 12-15
03-06 18-21
22-25 31-03
04-07 19-22
02-05 17-20
20-23 30-02
05-08 18-21
7.950.000 7.950.000
3
25-27
22-24
06-08
26-28
08-10
19-21
26-28
07-09
27-29
25-27
06-08
27-29
5.950.000
4
16-19
13-16
28-31
17-20
29-01
05-08
17-20
28-31
18-21
16-19
28-01
19-22
7.950.000
4
02-05
30-02
07-10
03-06
09-12
13-16
03-06
08-11
04-07
02-05
07-10
05-08
7.950.000
3
09-11
06-08
15-17
10-12
17-19
19-21
10-12
14-16
11-13
09-11
15-17
13-15
5.950.000
174 175 176 177
Leadership Skill How Become a More Effective Leader Modern Office Administration and Filling System PROJECT MANAGEMENT DARI KONSEPTUAL SAMPAI OPERASIONAL PRODUCTION PLANNING AND INVENTORY CONTROL (PPIC)
30
178
TRAINING NEEDS ANALYSIS(TNA),TRAINING PLAN, TRAINING BUDGET AND TRAINING IMPACT EVALUATION(TIE)
3
04-06
01-03
27-01
05-07
03-05
19-21
05-07
31-02
06-08
04-06
30-01
04-06
5.950.000
179
MANAJEMEN ARSIP DINAMIS DAN PERPUSTAKAAN BERBASIS TI
2
23-24
20-21
27-28
24-25
02-03
19-20
24-25
31-01
25-26
23-24
30-31
27-28
3.950.000
180 181 182
OTOMASI PERPUSTAKAAN BERBASIS SLIMS KEWIRAUSAHAAN ENTERPRENEURSHIP CAREER MANAGEMENT
3 3 3
02-04 23-25 23-25
30-01 20-22 20-22
06-08 13-15 06-08
03-05 24-26 24-26
08-10 22-24 08-10
19-21 19-21 12-14
03-05 24-26 24-26
07-09 14-16 07-09
04-06 25-27 25-27
02-04 23-25 23-25
06-08 13-15 06-08
27-29 27-29 27-29
5.950.000 5.950.000 5.950.000
183
COMPREHENSIVE TRAINING MANAGEMENT SYSTEM
3
02-04
30-01
13-15
03-05
15-17
19-21
03-05
14-16
04-06
02-04
13-15
04-06
5.950.000
4
17-20
14-17
28-31
18-21
29-01
13-16
18-21
28-31
19-22
17-20
28-01
19-22
7.950.000
3
16-18
13-15
22-24
17-19
22-24
19-21
17-19
23-25
18-20
16-18
22-24
18-20
5.950.000
184 185 186
ESSENTIAL SKILL FOR SECRETARY AND ADMINISTRATION PROFESSIONAL INTEGRATED HUMAN RESOURCES MANAGEMENT LEADERSHIP AND EFFECTIVE SUPERVISORY
4
23-26
20-23
27-30
24-27
30-02
05-08
24-27
28-31
25-28
23-26
27-30
04-07
7.950.000
187
PELAKSANAAN DAN PERMASALAHAN PENGADAAN TANAH PEMBEBASAN LAHAN
3
02-04
30-01
27-01
03-05
02-04
14-16
03-05
31-02
04-06
02-04
30-01
27-29
5.950.000
188
PENERAPAN EKONOMI TEKNIK DALAM PROSES PENGAMBILAN KEPUTUSAN BISNIS
4
10-13
07-10
06-09
10-13
08-11
06-09
11-14
07-10
12-15
10-13
06-09
11-14
7.950.000
PLANNING AND ORGANIZE TRAINING TRAINING DEVELOPMENT MANAGEMENT Salesmanship Skills BASIC RELATIONSHIP MANAGEMENT FOR LEADERS COMPREHENSIVE MANAGERIAL SKILLS & LEADERSHIP TRAINING
3 3 2
18-20 09-11 16-17
15-17 06-08 13-14
13-15 01-03 09-10
19-21 10-12 17-18
15-17 03-05 11-12
19-21 19-21 15-16
19-21 10-12 17-18
14-16 02-04 10-11
20-22 11-13 18-19
18-20 09-11 16-17
13-15 01-03 09-10
20-22 13-15 18-19
5.950.000 5.950.000 4.500.000
3
23-25
20-22
13-15
24-26
15-17
07-09
24-26
14-16
25-27
23-25
13-15
27-29
5.950.000
3
18-20
15-17
01-03
19-21
03-05
05-07
19-21
02-04
20-22
18-20
01-03
20-22
5.950.000
194 195 196 197 198
DEVELOVING HIGH PERFORMANCE TEAMS EFFECTIVE EXECUTIVE SECRETARY FILLING SYSTEM FOR SECRETARY HR MANAGEMENT HR MANAGEMENT OF CHANGE
2 2 3 2 3
26-27 02-03 16-18 04-05 11-13
23-24 30-31 13-15 01-02 08-10
09-10 16-17 29-31 06-07 13-15
27-28 03-04 17-19 05-06 11-13
11-12 18-19 29-31 08-09 15-17
12-13 20-21 14-16 05-06 12-14
27-28 03-04 17-19 05-06 12-14
10-11 14-15 28-30 07-08 14-16
28-29 04-05 18-20 06-07 13-15
26-27 02-03 16-18 04-05 11-13
09-10 16-17 29-01 06-07 13-15
27-28 04-05 18-20 06-07 13-15
3.950.000 3.950.000 5.950.000 3.950.000 5.950.000
199
INTEGRATED DOCUMENT & ELECTRONIC FILING SYSTEM
2
19-20
16-17
20-21
20-21
22-23
19-20
20-21
21-22
21-22
19-20
20-21
21-22
3.950.000
200
INVENTORY MANAGEMENT AND COST INVESTMENT RECOVERY
4
03-06
31-03
28-03
04-07
02-05
13-16
04-07
01-04
05-08
03-06
31-03
05-08
7.950.000
201
Logistic Management
2
09-10
06-07
08-09
10-11
10-11
20-21
10-11
09-10
11-12
09-10
08-09
11-12
3.950.000
202
LOGISTIC MANAGEMENT & SUPPLY CHAIN MANAGEMENT
3
16-18
13-15
15-17
17-19
17-19
07-09
17-19
14-16
18-20
16-18
15-17
18-20
5.950.000
203 204
MAN POWER PLANNING MANAJEMEN PRODUKSI DAN OPERASI (MPO)
3 4
23-25 02-05
20-22 30-02
22-24 28-31
24-26 03-06
22-24 29-01
12-14 05-08
24-26 03-06
23-25 28-31
25-27 04-07
23-25 02-05
22-24 28-01
27-29 04-07
5.950.000 7.950.000
189 190 191 192 193
31
205 206 207 208
MATERIAL MANAGEMENT FOR PROJECT MENINGKATKAN EFEKTIVITAS FUNGSI SUPERVISOR PLAN LAY OUT Office SERVICE EXCELLENT
4
10-13
07-10
27-02
10-13
02-05
13-16
11-14
31-03
12-15
10-13
30-02
12-15
7.950.000
2
19-20
16-17
09-10
20-21
11-12
19-20
20-21
10-11
21-22
19-20
09-10
21-22
3.950.000
3 3
25-27 04-06
22-24 01-03
13-15 20-22
26-28 05-07
15-17 22-24
19-21 07-09
26-28 05-07
14-16 21-23
27-29 06-08
25-27 04-06
13-15 20-22
27-29 06-08
5.950.000 5.950.000
209
SUPERVISORY LEADERSHIP AND DECISSION MAKING
3
09-11
06-08
27-29
10-12
31-02
12-14
10-12
28-30
11-13
09-11
27-29
11-13
5.950.000
210
WAREHOUSE MANAGEMENT OPERATION AND CONTROL
2
23-24
20-21
06-07
24-25
08-09
19-20
24-25
07-08
25-26
23-24
06-07
27-28
3.950.000
211 212
Warehousing & Distribution Management TAX ACCOUNTING
3 3
02-04 23-25
30-01 20-22
15-17 06-08
03-05 24-26
17-19 08-10
14-16 19-21
03-05 24-26
14-16 07-09
04-06 25-27
02-04 23-25
15-17 06-08
04-06 27-29
5.950.000 5.950.000
213
RESTITUSI PAJAK, PEMERIKSAAN PAJAK, KEBERATAN, BANDING DAN GUGATAN
3
02-04
30-01
13-15
03-05
15-17
19-21
03-05
14-16
04-06
02-04
13-15
27-29
5.950.000
214
MANAJEMEN MUTU TERPADU
2
09-10
06-07
20-21
10-11
22-23
19-20
10-11
21-22
11-12
09-10
20-21
11-12
3.950.000
215
TOTAL QUALITY MANAGEMENT SERIES MANAJEMEN MUTU TERPADU
2
16-17
13-14
27-28
17-18
29-30
20-21
17-18
28-29
18-19
16-17
27-28
18-19
3.950.000
216 217 218
BUILDING A TEAM CAREER PLANNING SYSTEM COMPENSATION SYSTEM DEVELOPMENT
2 2 2
02-03 09-10 23-24
30-31 06-07 20-21
06-07 13-14 27-28
03-04 10-11 24-25
22-23 23-24 29-30
19-20 20-21 20-21
03-04 10-11 24-25
14-15 15-16 28-29
04-05 11-12 25-26
02-03 09-10 23-24
06-07 13-14 27-28
27-28 28-29 28-29
3.950.000 3.950.000 3.950.000
219
COMPETENCY-BASED HUMAN RESOURCES MANAGEMENT
2
04-05
01-02
27-28
05-06
02-03
19-20
05-06
31-01
06-07
04-05
30-31
27-28
3.950.000
220 221
EFFECTIVE PERFORMANCE APPRAISAL EFFECTIVE TRAINING MANAGEMENT
2 3
18-19 25-27
15-16 22-24
15-16 22-24
19-20 26-28
15-16 22-24
19-20 12-14
19-20 26-28
15-16 21-23
20-21 27-29
18-19 25-27
15-16 22-24
18-19 27-29
3.950.000 5.950.000
222
HUMAN RESOURCES MANAGEMENT FOR NONHR MANAGER
2
05-06
02-03
29-30
06-07
31-01
20-21
06-07
30-31
07-08
05-06
29-30
04-05
3.950.000
2 2 2
12-13 19-20 23-24
09-10 16-17 20-21
01-02 09-10 16-17
10-11 20-21 24-25
04-05 10-11 17-18
05-06 15-16 19-20
13-14 20-21 24-25
02-03 09-10 14-15
14-15 21-22 25-26
12-13 19-20 23-24
01-02 09-10 16-17
13-14 20-21 27-28
3.950.000 3.950.000 3.950.000
2
09-10
06-07
30-31
12-13
01-02
12-13
10-11
28-29
11-12
09-10
30-01
14-15
3.950.000
2 2
16-17 23-24
13-14 20-21
02-03 06-07
17-18 24-25
02-03 08-09
20-21 05-06
17-18 24-25
03-04 07-08
18-19 25-26
16-17 23-24
02-03 06-07
21-22 27-28
3.950.000 3.950.000
223 224 225 226 227 228
JOB COMPETENCY PROFILING MEASURING TRAINING IMPACT PERFORMANCE BASED PAY STRATEGIC HUMAN RESOURCES MANAGEMENT FOR GLOBAL COMPETITIVE ADVANTAGE WORKLOAD ANALYSIS ACTIVITY BASED MANAGEMENT
229
NEGOTIATION IMPROVE YOUR NEGOTIATING SKILLS AND MAKE YOU MORE EFFECTIVE NEGOTIATOR
2
02-03
30-31
13-14
03-04
15-16
12-13
03-04
14-15
04-05
02-03
13-14
04-05
3.950.000
230 231 232 233
STRATEGIC MANAGEMENT Supply Chain Management (SCM) Supplier Management ELECTRONIC FILLING SYSTEM MANAGEMENT
3 2 2 4
25-27 04-05 11-12 09-12
22-24 01-02 08-09 06-09
27-01 08-09 15-16 27-30
26-28 05-06 12-13 10-13
02-04 10-11 17-18 15-18
14-16 20-21 08-09 05-08
26-28 05-06 12-13 10-13
31-02 09-10 15-16 07-10
27-29 06-07 13-14 11-14
25-27 04-05 11-12 09-12
30-01 08-09 15-16 27-30
27-29 06-07 13-14 11-14
5.950.000 3.950.000 3.950.000 7.950.000
32
234
ASPEK HUKUM DAN PENYELESAIAN KONFLIK PERTANAHAN
3
23-25
20-22
06-08
24-26
22-24
19-21
24-26
14-16
25-27
23-25
06-08
27-29
5.950.000
235 236
ANTI MONOPOLI HUKUM KEPAILITAN
3 3
02-04 09-11
30-01 06-08
13-15 20-22
03-05 10-12
22-24 22-24
19-21 19-21
03-05 10-12
14-16 14-16
04-06 11-13
02-04 09-11
13-15 20-22
27-29 27-29
5.950.000 5.950.000
237
HUKUM KETENAGAKERJAAN & HUBUNGAN INDUSTRIAL
3
16-18
13-15
27-29
17-19
22-24
19-21
17-19
28-30
18-20
16-18
27-29
27-29
5.950.000
238
HUKUM PERLINDUNGAN KONSUMEN DAN PERSAINGAN BISNIS
3
25-27
22-24
27-01
26-28
02-04
19-21
26-28
31-02
27-29
25-27
30-01
27-29
5.950.000
239
HUKUM TINDAK PIDANA KORUPSI
3
04-06
01-03
08-10
05-07
08-10
19-21
05-07
07-09
06-08
04-06
08-10
04-06
5.950.000
240
STRATEGI MENGANTISIPASI RISIKO TINDAK PIDANA (KORUPSI)
3
11-13
08-10
15-17
11-13
15-17
19-21
12-14
14-16
13-15
11-13
15-17
11-13
5.950.000
241
TINDAK PIDANA PENCUCIAN UANG DAN PERANAN BANK UNTUK MENCEGAHNYA
3
18-20
15-17
22-24
19-21
22-24
05-07
19-21
21-23
20-22
18-20
22-24
18-20
5.950.000
242
TIPIKOR DALAM PENGELOLAAN KEUANGAN PERUSAHAAN & PERBANKAN
3
23-25
20-22
29-31
24-26
29-31
12-14
24-26
29-31
25-27
23-25
29-01
27-29
5.950.000
243 244 245 246 247
BERITA ACARA PEMERIKSAAN MARITIME & SHIPPING LAW IN INDONESIA HUKUM DAN KONTRAK KONSTRUKSI BASIC OF SUPPLY CHAIN MANAGEMENT EFFECTIVE LINE BALANCING
3 3 3 2 2
02-04 09-11 16-18 16-17 23-24
30-01 06-08 13-15 13-14 20-21
01-03 06-08 13-15 06-07 13-14
03-05 10-12 17-19 17-18 24-25
03-05 10-12 17-19 08-09 15-16
19-21 07-09 14-16 19-20 05-06
03-05 10-12 17-19 17-18 24-25
02-04 09-11 14-16 07-08 14-15
04-06 11-13 18-20 18-19 25-26
02-04 09-11 16-18 16-17 23-24
01-03 06-08 13-15 06-07 13-14
06-08 13-15 20-22 18-19 27-28
5.950.000 5.950.000 5.950.000 3.950.000 3.950.000
3
02-04
30-01
20-22
03-05
22-24
12-14
03-05
21-23
04-06
02-04
20-22
04-06
5.950.000
3
09-11
06-08
27-29
10-12
29-31
19-21
10-12
28-30
11-13
09-11
27-29
11-13
5.950.000
2 2
25-26 05-06
22-23 02-03
08-09 15-16
26-27 06-07
10-11 17-18
15-16 19-20
26-27 06-07
09-10 15-16
27-28 07-08
25-26 05-06
08-09 15-16
28-29 07-08
3.950.000 3.950.000
248 249 250 251
FILLING MANAGEMENT FOR SECRETARY AND ADMINISTRATION STAFF INFORMATION SYSTEMS AND INFORMATION TECHNOLOGIES FOR SUPPLY CHAIN MANAGEMENT ISO WAREHOUSING KOMPUTERISASI PERGUDANGAN
252
MAINTENANCE MANAGEMENT (FOR MANUFACTURE AND OIL & GAS COMPANY)
3
11-13
08-10
22-24
11-13
22-24
05-07
12-14
23-25
13-15
11-13
22-24
13-15
6.500.000
253
MEASURING AND MANAGING COST ESCALATION IN PROJECT
2
26-27
23-24
02-03
27-28
02-03
20-21
27-28
03-04
28-29
26-27
02-03
27-28
3.950.000
254 255
MODERN WAREHOUSE DESIGN NEGOTIATION SKILL FOR PURCHASING STAFF
2 3
02-03 09-11
30-31 06-08
09-10 15-17
03-04 10-12
11-12 17-19
08-09 14-16
03-04 10-12
10-11 14-16
04-05 11-13
02-03 09-11
09-10 15-17
04-05 11-13
3.950.000 5.950.000
256
OPERATING SYSTEMS TECHNOLOGIES AND INSTALLATION PROCEDURES
3
18-20
15-17
20-22
19-21
22-24
19-21
19-21
21-23
20-22
18-20
20-22
20-22
5.950.000
257
PLANNING AND MANAGING INVENTORIES IN A SUPPLY CHAIN
3
23-25
20-22
27-29
24-26
29-31
05-07
24-26
28-30
25-27
23-25
27-29
27-29
5.950.000
258
PLANNING DEMAND AND SUPPLY IN A SUPPLY CHAIN
3
04-06
01-03
27-01
05-07
03-05
12-14
05-07
31-02
06-08
04-06
30-01
06-08
5.950.000
259
PROJECT EVALUATION AND FINANCING
3
16-18
13-15
13-15
17-19
15-17
07-09
17-19
14-16
18-20
16-18
13-15
18-20
5.950.000
33
260
PROJECT MANAGEMENT USING MICROSOFT PROJECT
3
25-27
22-24
22-24
26-28
22-24
14-16
26-28
23-25
27-29
25-27
22-24
27-29
5.950.000
261
PROJECT MANAGEMENT(PM) WITH PRIMAVERA V6
3
02-04
30-01
29-31
03-05
31-02
19-21
03-05
29-31
04-06
02-04
29-01
04-06
5.950.000
262
RFID for WAREHOUSE
2
09-10
06-07
02-03
10-11
02-03
05-06
10-11
03-04
11-12
09-10
02-03
11-12
3.950.000
263
STRATEGI SISTEM INFORMASI KESEHATAN DI RUMAH SAKIT
3
18-20
15-17
08-10
19-21
10-12
12-14
19-21
09-11
20-22
18-20
08-10
20-22
5.950.000
264
STUDI KELAYAKAN INVESTASI MENGGUNAKAN APLIKASI MICROSOFT EXCEL
3
23-25
20-22
15-17
24-26
17-19
19-21
24-26
14-16
25-27
23-25
15-17
27-29
5.950.000
265
TRANSPORTATION AND FACILITY DECISIONS IN A SUPPLY CHAIN
3
04-06
01-03
20-22
05-07
22-24
07-09
05-07
21-23
06-08
04-06
20-22
06-08
5.950.000
266 267 268 269 270
VENDOR MANAGED INVENTORY Workload Analysis ENTERPRISE RESOURCES PLANNING (ERP) ANALISA KEBUTUHAN BARANG PERSEDIAAN PROJECT COST MANAGEMENT
2 2 4 3 3
11-12 16-17 24-27 02-04 11-13
08-09 13-14 21-24 30-01 08-10
27-28 27-28 06-09 13-15 22-24
12-13 17-18 25-28 03-05 10-12
29-30 04-05 08-11 15-17 22-24
15-16 19-20 05-08 12-14 19-21
12-13 17-18 25-28 03-05 12-14
28-29 31-01 07-10 14-16 23-25
13-14 18-19 26-29 04-06 13-15
11-12 16-17 24-27 02-04 11-13
27-28 30-31 06-09 13-15 22-24
13-14 18-19 04-07 27-29 13-15
3.950.000 3.950.000 7950000 5.950.000 5.950.000
271
PROJECT MANAGEMENT IN ENGINEERING, PROCUREMENT & CONSTRUCTION
3
18-20
15-17
29-31
19-21
31-02
07-09
19-21
29-31
20-22
18-20
29-01
20-22
5.950.000
ADVANCED LAND TRANSPORT HUMAN RESOURCE PLANNING AND PRODUCTIVITY JOB DESCRIPTION ANALYSIS, DEVELOPMENT, AND DESIGN
3
23-25
20-22
01-03
24-26
02-04
14-16
24-26
02-04
25-27
23-25
01-03
27-29
5.950.000
3
09-11
06-08
13-15
10-12
22-24
19-21
10-12
14-16
11-13
09-11
13-15
27-29
6500000
2
16-17
13-14
20-21
17-18
22-23
19-20
17-18
14-15
18-19
16-17
20-21
27-28
3.950.000
275 276 277
Project Management (3 Hr) PROJECT MANAGEMENT (PM) (5Hr) STRATEGIC HUMAN RESOURCE MANAGEMENT
3 5 3
23-25 02-06 11-13
20-22 30-03 08-10
27-29 27-03 06-08
24-26 03-07 11-13
22-24 08-12 02-04
19-21 05-09 19-21
24-26 03-07 12-14
14-16 31-04 07-09
25-27 04-08 13-15
23-25 02-06 11-13
27-29 30-03 06-08
27-29 11-15 27-29
6500000 9500000 6500000
278
STRATEGIC HUMAN RESOURCE MANAGEMENT AND ORGANIZATION DEVELOPMENT
3
18-20
15-17
15-17
19-21
15-17
19-21
19-21
14-16
20-22
18-20
15-17
18-20
6500000
279 280 281
Strategic Performance Management Strategic Planning CRYSTALL BALL
3 5 4
25-27 02-06 09-12
22-24 30-03 06-09
22-24 27-31 27-02
26-28 03-07 10-13
22-24 29-02 02-05
19-21 12-16 05-08
26-28 03-07 10-13
21-23 31-04 28-31
27-29 04-08 11-14
25-27 02-06 09-12
22-24 27-01 30-02
27-29 04-08 11-14
6500000 9500000 7.950.000
282
DECISION MAKING BY USING STRATEGIC THINKING (PENDEKATAN SISTEMIK DAN NEW 7 TOOLS APPROACH)
2
16-17
13-14
06-07
17-18
08-09
19-20
17-18
07-08
18-19
16-17
06-07
18-19
3.950.000
283
INOVASI DAN KREATIFITAS MENUJU ORGANISASI PEMBELAJARAN
2
02-03
30-31
20-21
03-04
22-23
20-21
03-04
14-15
04-05
02-03
20-21
27-28
3.950.000
284 285
LEADERSHIP FOR MANAGER ADMINISTRASI KEPABEANAN
4 4
10-13 09-12
07-10 06-09
27-30 20-23
10-13 10-13
29-01 29-01
06-09 05-08
11-14 10-13
28-31 21-24
12-15 11-14
10-13 09-12
27-30 20-23
12-15 11-14
7.950.000 7.950.000
286
Custom facility, Shipping Documents & Export Import Procedure
2
16-17
13-14
27-28
17-18
22-23
12-13
17-18
28-29
18-19
16-17
27-28
18-19
3.950.000
272 273 274
34
287 288 289 290 291
EFFECTIVE PUBLIC RELATIONS SKILL Export-Import Export-Import and Incoterm FREIGHT FORWARDING Incoterm 2010
3 3 3 2 2
23-25 02-04 11-13 18-19 26-27
20-22 30-01 08-10 15-16 23-24
27-01 06-08 13-15 23-24 29-30
24-26 03-05 10-12 19-20 27-28
02-04 08-10 15-17 23-24 01-02
19-21 07-09 14-16 19-20 05-06
24-26 03-05 12-14 19-20 27-28
31-02 07-09 14-16 24-25 30-31
25-27 04-06 13-15 20-21 28-29
23-25 02-04 11-13 18-19 26-27
30-01 06-08 13-15 23-24 29-30
27-29 04-06 13-15 20-21 27-28
5.950.000 5.950.000 5.950.000 3.950.000 3.950.000
292
PEMAHAMAN SHIPPING DOCUMENT & PROSEDUR KEPABEANAN
3
04-06
01-03
01-03
05-07
03-05
12-14
05-07
02-04
06-08
04-06
01-03
06-08
5.950.000
4
23-26
20-23
13-16
24-27
15-18
12-15
24-27
21-24
25-28
23-26
13-16
04-07
7.950.000
3
02-04
30-01
20-22
03-05
22-24
19-21
03-05
14-16
04-06
02-04
20-22
27-29
5.950.000
2 3
16-17 23-25
13-14 20-22
30-31 27-01
17-18 24-26
22-23 03-05
19-20 12-14
17-18 24-26
14-15 02-04
18-19 25-27
16-17 23-25
30-01 30-01
27-28 27-29
3.950.000 5.950.000
293 294 295 296
INFORMATION TECHNOLOGY PROJECT MANAGEMENT INVENTORY MANAGEMENT FOR RAW MATERIAL Office Automation PROBLEM SOLVING & DECISION MAKING
297
STRATEGIC PLANNING FOR INFORMATION SYSTEMS
3
25-27
22-24
27-29
26-28
22-24
19-21
26-28
14-16
27-29
25-27
27-29
27-29
5.950.000
298 299 300 301 302 303 304 305 306 307
SUPPLY MARKET ANALYSIS TOTAL COST OF OWNERSHIP ANALYSIS CONTRACT MANAGEMENT PAJAK DAN PROSEDUR IMPLEMENTASI TAX AND FINANCIAL CONTROL Inventory Management Manufacturing Industry OPTIMIZATION FOR PRODUCTION SYSTEM Perancangan Tata Letak Pabrik PRODUCTION AND OPERATION MANAGEMENT PRODUCTION AND PLANNING CONTROL
4 3 4 4 3 4 4 4 4 4
02-05 16-18 23-26 02-05 09-11 24-27 10-13 16-19 24-27 03-06
30-02 13-15 20-23 30-02 06-08 21-24 07-10 13-16 21-24 31-03
28-03 15-17 27-30 27-02 06-08 13-16 07-10 06-09 07-10 14-17
03-06 17-19 24-27 03-06 10-12 25-28 10-13 17-20 25-28 04-07
02-05 17-19 15-18 29-01 22-24 02-05 16-19 29-01 02-05 09-12
12-15 19-21 12-15 05-08 19-21 13-16 12-15 05-08 13-16 06-09
03-06 17-19 24-27 03-06 10-12 25-28 11-14 17-20 25-28 04-07
31-03 14-16 07-10 21-24 14-16 28-31 08-11 21-24 28-31 01-04
04-07 18-20 25-28 04-07 11-13 26-29 12-15 18-21 26-29 05-08
02-05 16-18 23-26 02-05 09-11 24-27 10-13 16-19 24-27 03-06
31-03 15-17 27-30 30-02 06-08 13-16 07-10 06-09 07-10 14-17
04-07 18-20 04-07 11-14 27-29 12-15 04-07 19-22 12-15 19-22
7.950.000 5.950.000 7.950.000 7.950.000 5.950.000 7.950.000 7.950.000 7.950.000 7.950.000 7.950.000
308
Production Handling Separation and Measurement
4
09-12
06-09
21-24
10-13
15-18
12-15
10-13
07-10
11-14
09-12
21-24
04-07
7.950.000
309 310 311 312
QUALITY CONTROL OF PRODUCT QUALITY SYSTEM ENGINEERING SYSTEM AND COST PRODUCTION ANALISA KEUANGAN
4 4 4 2
24-27 03-06 23-26 09-10
21-24 31-03 20-23 06-07
27-30 28-03 21-24 27-28
25-28 04-07 24-27 10-11
02-05 09-12 02-05 22-23
13-16 06-09 13-16 19-20
25-28 04-07 24-27 10-11
28-31 01-04 28-31 14-15
26-29 05-08 25-28 11-12
24-27 03-06 23-26 09-10
27-30 31-03 21-24 30-31
04-07 11-14 12-15 27-28
7.950.000 7.950.000 7.950.000 4.500.000
313
ANALISA KREDIT MODAL KERJA KONTRAKTOR DAN STANDBY KREDIT
2
16-17
13-14
06-07
17-18
23-24
20-21
17-18
15-16
18-19
16-17
06-07
28-29
4.500.000
314 315
ANALISA PERKREDITAN BASIC ACCOUNTING
4 4
23-26 02-05
20-23 30-02
13-16 20-23
24-27 03-06
02-05 08-11
12-15 05-08
24-27 03-06
28-31 31-03
25-28 04-07
23-26 02-05
13-16 20-23
18-21 04-07
7.950.000 7.950.000
316
PEMBERIAN KREDIT DENGAN PENDEKATAN LAPORAN ARUS KAS_CASH FLOW
2
11-12
08-09
27-28
12-13
22-23
19-20
12-13
14-15
13-14
11-12
27-28
27-28
4.500.000
317
PENILAIAN KELAYAKAN PROYEK (FEASIBILITY STUDY)
2
18-19
15-16
01-02
19-20
23-24
20-21
19-20
15-16
20-21
18-19
01-02
28-29
4.500.000
35
318 319
PENYELESAIAN KREDIT BERMASALAH PENYUSUNAN DAN ANALISA SCORING RATING
2 2
26-27 05-06
23-24 02-03
08-09 16-17
27-28 06-07
22-23 15-16
19-20 20-21
27-28 06-07
07-08 14-15
28-29 07-08
26-27 05-06
08-09 16-17
27-28 28-29
4.500.000 4.500.000
320
PENYUSUNAN PERATURAN INTERNAL PERKREDITAN BANK
3
11-13
08-10
22-24
10-12
22-24
19-21
12-14
21-23
13-15
11-13
22-24
27-29
5.950.000
321 322 323 324
GOOD CORPORATE GOVERNANCE COST MANAGEMENT DASAR-DASAR PERBENDAHARAAN MANAJEMEN RISIKO INVESTASI
3 3 4 4
18-20 16-18 23-26 02-05
15-17 13-15 20-23 30-02
29-31 27-01 06-09 13-16
19-21 17-19 24-27 03-06
29-31 22-24 29-01 02-05
19-21 19-21 05-08 12-15
19-21 17-19 24-27 03-06
28-30 14-16 21-24 28-31
20-22 18-20 25-28 04-07
18-20 16-18 23-26 02-05
29-01 30-01 06-09 13-16
27-29 27-29 18-21 04-07
5.950.000 5.950.000 7.950.000 7.950.000
325
MANAJEMEN KEUANGAN UNTUK NON MANAJER KEUANGAN
2
09-10
06-07
20-21
10-11
22-23
19-20
10-11
14-15
11-12
09-10
20-21
27-28
3.950.000
2
16-17
13-14
27-28
17-18
23-24
20-21
17-18
15-16
18-19
16-17
27-28
28-29
3.950.000
4
09-12
06-09
27-30
10-13
02-05
12-15
10-13
28-31
11-14
09-12
27-30
11-14
7.950.000
4
16-19
13-16
27-02
17-20
08-11
06-09
17-20
31-03
18-21
16-19
30-02
18-21
7.950.000
4
24-27
21-24
06-09
25-28
15-18
13-16
25-28
07-10
26-29
24-27
06-09
05-08
7.950.000
3
11-13
08-10
22-24
10-12
22-24
19-21
12-14
14-16
13-15
11-13
22-24
27-29
5.950.000
4
09-12
06-09
27-30
10-13
29-01
05-08
10-13
21-24
11-14
09-12
27-30
18-21
7.950.000
326 327 328 329 330 331
STUDY KELAYAKAN BISNIS CUSTOMER RELATIONSHIP MANAGEMENT (CRM) FINANCING CONDOTEL HOTEL OPERATION MANAGEMENT OF OUTSOURCE STAFF HOUSING AND CATERING SERVICES Service Recovery Create Loyal Customers for Life MEMBEDAH PROFESI SEKRETARIS PROFESSIONAL
332
PRESENTATION SKILL FOR PUBLIC RELATIONS & MARKETING STAFF (USING MICROSOFT POWER POINT)
2
12-13
09-10
06-07
12-13
08-09
19-20
13-14
07-08
14-15
12-13
06-07
14-15
3.950.000
333 334
IT AUDIT PRACTICES IT HELPDESK
3 3
11-13 18-20
08-10 15-17
27-29 01-03
10-12 19-21
29-31 02-04
19-21 19-21
12-14 19-21
28-30 31-02
13-15 20-22
11-13 18-20
27-29 01-03
11-13 20-22
5.950.000 5.950.000
335
Change & conflict management and dealing with difficult people
2
02-03
30-31
27-28
03-04
02-03
19-20
03-04
31-01
04-05
02-03
30-31
04-05
3.950.000
2 2 3 3 2
05-06 12-13 11-13 09-11 02-03
02-03 09-10 08-10 06-08 30-31
27-28 27-28 15-17 27-01 27-28
06-07 12-13 11-13 10-12 03-04
29-30 02-03 17-19 22-24 22-23
19-20 08-09 19-21 19-21 19-20
06-07 13-14 12-14 10-12 03-04
30-31 31-01 14-16 28-30 14-15
07-08 14-15 13-15 11-13 04-05
05-06 12-13 11-13 09-11 02-03
27-28 30-31 15-17 30-01 27-28
07-08 14-15 13-15 27-29 27-28
3.950.000 3.950.000 5.950.000 5.950.000 3.950.000
3
16-18
13-15
08-10
17-19
10-12
19-21
17-19
09-11
18-20
16-18
08-10
20-22
5.950.000
336 337 338 339 340 341 342
Strategic and Systematic Thinking THE LEADERSHIP CHALLENGE COACHING & CONSELING DI PERUSAHAAN COACHING AND COUNSELING ( MONITORING) PERFORMANCE COACHING FOR MANAGER EFFECTIVE PRESENTATION AND REPORT WRITING Effective Time Management
3
23-25
20-22
15-17
24-26
17-19
19-21
24-26
14-16
25-27
23-25
15-17
27-29
5.950.000
343
HANDLING CONFLICT AND COMPLAINT EFFECTIVELY
3
09-11
06-08
27-29
10-12
22-24
19-21
10-12
29-31
11-13
09-11
27-29
13-15
5.950.000
344 345 346
Strategic Time Management TIME MANAGEMENT HOW TO HANDLE CRITICISM AND COMPLAIN
3 4 2
18-20 16-19 23-24
15-17 13-16 20-21
20-22 28-03 06-07
19-21 17-20 24-25
22-24 02-05 08-09
07-09 05-08 15-16
19-21 17-20 24-25
23-25 01-04 07-08
20-22 18-21 25-26
18-20 16-19 23-24
20-22 31-03 06-07
18-20 18-21 27-28
5.950.000 7.950.000 3.950.000
36
4
02-05
30-02
27-02
03-06
02-05
05-08
03-06
31-03
04-07
02-05
30-02
04-07
7.950.000
Akuntansi Perpajakan pada Badan Usaha Milik Negara (BUMN)
3
02-04
30-01
27-01
03-05
02-04
05-07
03-05
31-02
04-06
02-04
30-01
04-06
5.950.000
Fraud Prevention, Detection And Investigation Audit
3
09-11
06-08
06-08
10-12
08-10
12-14
10-12
07-09
11-13
09-11
06-08
11-13
5.950.000
General Affairs Management
3
16-18
13-15
13-15
17-19
15-17
19-21
17-19
14-16
18-20
16-18
13-15
18-20
5.950.000
Hubungan Industrial Dan Tenaga Kerja
3
23-25
20-22
20-22
24-26
22-24
07-09
24-26
21-23
25-27
23-25
20-22
27-29
5.950.000
ISO 26000 UNDERSTANDING AND IMPLEMENTING CSR
3
04-06
01-03
27-29
05-07
29-31
14-16
05-07
28-30
06-08
04-06
27-29
06-08
5.950.000
Legal Due Diligence (LC Perdagangan)
3
11-13
08-10
01-03
11-13
03-05
19-21
12-14
02-04
13-15
11-13
01-03
13-15
5.950.000
Keterampilan Pengelolaan Hubungan Industrial Sampai Dengan Penyelesaian Perselisihan
3
18-20
15-17
08-10
19-21
10-12
05-07
19-21
09-11
20-22
18-20
08-10
20-22
5.950.000
Merger Dan Akuisisi
2
26-27
23-24
16-17
27-28
18-19
12-13
27-28
14-15
28-29
26-27
16-17
27-28
3.950.000
Pengendalian Kinerja Bisnis Dan Aliran Kas
3
02-04
30-01
22-24
03-05
22-24
19-21
03-05
23-25
04-06
02-04
22-24
04-06
5.950.000
Rekonsiliasi Fiskal & Penyusunan SPT Tahunan PPH Badan
3
16-18
13-15
27-01
17-19
02-04
12-14
17-19
31-02
18-20
16-18
30-01
18-20
5.950.000
Training Analysis Program
3
23-25
20-22
06-08
24-26
08-10
19-21
24-26
07-09
25-27
23-25
06-08
27-29
5.950.000
Durasi
Jan
Feb
Mar
Apr
Mei
Jun
Juli
Aug
Sep
Okt
Nov
Des
Harga
347
Pengendalian Dokumen ISO 9001 2015
348
349 350 351 352 353 354 355 356 357 358
No.
Judul
MANAJEMEN - PROCUREMENT 1
Prinsip dasar dan prosedur pengadaan barang & jasa
3
23-25
20-22
29-31
24-26
31-02
07-09
24-26
28-30
25-27
23-25
29-01
27-29
5.950.000
2 3 4
HARGA PERKIRAAN SENDIRI (HPS) ASPEK TKDN INTEGRATED PROCUREMENT MANAGEMENT
2 2 2
23-24 09-10 23-24
20-21 06-07 20-21
27-28 20-21 27-28
24-25 10-11 24-25
02-03 22-23 22-23
05-06 19-20 19-20
24-25 10-11 24-25
31-01 14-15 14-15
25-26 11-12 25-26
23-24 09-10 23-24
30-31 20-21 30-31
27-28 27-28 27-28
3.950.000 3.950.000 3.950.000
5
TEKNIK DAN METODE PENYUSUNAN HPS OE (HARGA PERKIRAAN SENDIRI) ATAS PENGADAAN BARANG DAN JASA
3
23-25
20-22
22-24
24-26
22-24
07-09
24-26
23-25
25-27
23-25
22-24
27-29
5.950.000
6 7
BASIC PROCUREMENT & PURCHASING PROCUREMENT MANAGEMENT
3 2
16-18 09-10
13-15 06-07
06-08 20-21
17-19 10-11
08-10 22-23
19-21 19-20
17-19 10-11
07-09 21-22
18-20 11-12
16-18 09-10
06-08 20-21
18-20 11-12
5.950.000 3.950.000
37
8 9 10 11
PROCUREMENT STRATEGY PRINCIPLES OF PROCUREMENT MANAGEMENT E-PROCUREMENT (E-Proc) TEKNIK HARGA PERHITUNGAN SENDIRI (HPS)
2 3 3 3
16-17 04-06 16-18 09-11
13-14 01-03 13-15 06-08
27-28 08-10 06-08 06-08
17-18 05-07 17-19 10-12
29-30 10-12 22-24 08-10
07-08 19-21 19-21 19-21
17-18 05-07 17-19 10-12
28-29 09-11 14-16 07-09
18-19 06-08 18-20 11-13
16-17 04-06 16-18 09-11
27-28 08-10 06-08 06-08
18-19 06-08 27-29 13-15
3.950.000 5.950.000 5.950.000 5.950.000
12
SUSTAINABLE PROCUREMENT IN RELATION WITH QUALITY ASSURANCE
4
17-20
14-17
28-31
18-21
30-02
05-08
18-21
22-25
19-22
17-20
28-01
12-15
7.950.000
Communication SKILL Dynamic Interpersonal & Comunication Skills EFFECTIVE PRESENTATION & NEGOTIATION SKILLS Effective public speaking and business presentation CARA MENYENANGKAN MEMBANGUN TIM IMPIAN Constructive Anger Management Menjadi pribadi yang asertif Menjadi pribadi yang berpengaruh Motivating staff for excellent performance BOOST YOUR CREATIVITY IN THINKING MIND MAP BRAIN DEVELOPMENT FOR PERSONAL ASSISTANT & SECRETARY
2 2
12-13 25-26
09-10 22-23
06-07 20-21
12-13 26-27
08-09 22-23
08-09 20-21
13-14 26-27
07-08 21-22
14-15 27-28
12-13 25-26
06-07 20-21
14-15 28-29
3.950.000 3.950.000
2
04-05
01-02
29-30
05-06
31-01
05-06
05-06
30-31
06-07
04-05
29-30
06-07
3.950.000
2
09-10
06-07
01-02
10-11
04-05
15-16
10-11
02-03
11-12
09-10
01-02
11-12
3.950.000
4
16-19
13-16
20-23
17-20
02-05
12-15
17-20
31-03
18-21
16-19
20-23
18-21
7.950.000
3 3 3 3
02-04 04-06 11-13 23-25
30-01 01-03 08-10 20-22
27-01 13-15 22-24 01-03
03-05 05-07 11-13 24-26
22-24 15-17 22-24 02-04
19-21 19-21 19-21 19-21
03-05 05-07 12-14 24-26
14-16 14-16 21-23 02-04
04-06 06-08 13-15 25-27
02-04 04-06 11-13 23-25
30-01 13-15 22-24 01-03
27-29 04-06 11-13 27-29
5.950.000 5.950.000 5.950.000 5.950.000
2
09-10
06-07
27-28
10-11
22-23
19-20
10-11
14-15
11-12
09-10
27-28
27-28
3.950.000
3
16-18
13-15
27-01
17-19
02-04
19-21
17-19
31-02
18-20
16-18
30-01
18-20
5.950.000
12 13 14 15 16
EFFECTIVE MASTER OF CEREMONY (MC) ACHIEVEMENT MOTIVATION Advance Negotiation Skill CHANGE YOUR MINDSET MC (MASTER OF CEREMONY)
3 2 3 4 3
11-13 02-03 09-11 03-06 02-04
08-10 30-31 06-08 31-03 30-01
20-22 27-28 27-01 20-23 20-22
11-13 03-04 10-12 04-07 03-05
22-24 29-30 02-04 30-02 22-24
05-07 05-06 12-14 13-16 19-21
12-14 03-04 10-12 04-07 03-05
21-23 28-29 31-02 21-24 14-16
13-15 04-05 11-13 05-08 04-06
11-13 02-03 09-11 03-06 02-04
20-22 27-28 30-01 20-23 20-22
11-13 04-05 11-13 05-08 27-29
5.950.000 3.950.000 5.950.000 7.950.000 5.950.000
17
COMMUNICATION, ASSERTIVENESS AND CONFLICT MANAGEMENT
2
12-13
09-10
29-30
12-13
22-23
19-20
13-14
30-31
14-15
12-13
29-30
14-15
3.950.000
18 19 20
INNER SUCCESS TRAINING TOTOK AURA MENUJU TOTAL BEAUTY SPEED AND INNOVATION
4 3 3
23-26 09-11 09-11
20-23 06-08 06-08
13-16 08-10 15-17
24-27 10-12 10-12
15-18 10-12 17-19
12-15 19-21 12-14
24-27 10-12 10-12
21-24 09-11 14-16
25-28 11-13 11-13
23-26 09-11 09-11
13-16 08-10 15-17
04-07 11-13 11-13
7.950.000 5.950.000 5.950.000
21
HYPNOTIC SELLING TECHNIQUE Menjual Tanpa Hambatan dengan Aplikasi Hypnosis dan NLP
2
09-10
06-07
27-28
10-11
23-24
20-21
10-11
15-16
11-12
09-10
30-31
28-29
3.950.000
22
CONTEMPORARY COMMUNICATION & LEADERSHIP
3
02-04
30-01
27-29
03-05
22-24
19-21
03-05
14-16
04-06
02-04
27-29
27-29
5.950.000
MOTIVASI DAN PERSONAL DEVELOPMENT 1 2 3 4 5 6 7 8 9 10 11
38
23 24 25 26
TALENT MANAGEMENT WOMENS PRIME POWER, BEAUTY AND BRAIN ASSERTIVE TRAINING BRAIN POWER
4 2 3 3
03-06 16-17 02-04 16-18
31-03 13-14 30-01 13-15
28-31 13-14 13-15 27-29
04-07 17-18 03-05 17-19
29-01 22-23 15-17 29-31
05-08 19-20 19-21 19-21
04-07 17-18 03-05 17-19
28-31 14-15 14-16 28-30
05-08 18-19 04-06 18-20
03-06 16-17 02-04 16-18
28-01 13-14 13-15 27-29
05-08 27-28 27-29 18-20
7.950.000 3.950.000 5.950.000 5.950.000
27
CAPACITY BUILDING(MEMBANGUN KAPASITAS DAN KEMAMPUAN)
3
04-06
01-03
08-10
05-07
08-10
12-14
05-07
07-09
06-08
04-06
08-10
04-06
5.950.000
3
23-25
20-22
29-31
24-26
31-02
14-16
24-26
29-31
25-27
23-25
29-01
27-29
5.950.000
3
02-04
30-01
01-03
03-05
03-05
19-21
03-05
02-04
04-06
02-04
01-03
06-08
5.950.000
28 29
HUMAN QUOTIENS (IQ, EQ, AQ, SQ) INDIVIDUAL DEVELOPMENT (SERVICE PRODUCT)
30
PENINGKATAN MOTIVASI BERPRESTASI(ACHIEVEMENT MOTIVATION TRAINING)
3
02-04
30-01
13-15
03-05
15-17
19-21
03-05
14-16
04-06
02-04
13-15
27-29
5.950.000
31 32
PEOPLE SKILL PRIBADI EFEKTIF
5 2
09-13 19-20
06-10 16-17
20-24 27-28
17-21 12-13
29-02 23-24
12-16 19-20
10-14 20-21
21-25 28-29
11-15 21-22
09-13 19-20
20-24 27-28
11-15 21-22
8.950.000 3.950.000
33
SENSITIVITY TRAINING (TURNING POINT ATAU NEW BORN)
3
04-06
01-03
08-10
05-07
10-12
07-09
05-07
09-11
06-08
04-06
08-10
06-08
5.950.000
34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
TEKNIK PRESENTASI TRAINING OF TRAINER ACHIEVEMENT MOTIVATION EFFECTIVE COMMUNICATION SKILL EFFECTIVE PRESENTATION SKILLS EMOTIONAL QUETIENTS ICE BREAKING AND ENERGIZERS TRAINING OF TRAINER (TOT) Train the trainers ACHIEVEMENT MOTIVATION TRAINING CAPACITY BUILDING SOFT SKILL PROGRAM BREATHING ARTS FOR CREATIVE THINKING EFFECTIVE STRATEGY TO CONTROL STRESS ESQ FOR PEAK PERFORMANCE HUMAN PERFORMANCE AND LIMITATION
2 3 4 4 3 3 3 3 4 2 3 3 3 3 3
12-13 18-20 23-26 02-05 11-13 18-20 09-11 23-25 16-19 16-17 23-25 23-25 25-27 11-13 18-20
09-10 15-17 20-23 30-02 08-10 15-17 06-08 20-22 13-16 13-14 20-22 20-22 22-24 08-10 15-17
06-07 13-15 20-23 21-24 27-29 01-03 20-22 27-29 14-17 20-21 27-29 20-22 13-15 29-31 01-03
12-13 19-21 24-27 03-06 11-13 19-21 10-12 24-26 17-20 17-18 24-26 24-26 26-28 11-13 19-21
08-09 15-17 29-01 30-02 22-24 02-04 22-24 22-24 15-18 22-23 22-24 22-24 15-17 29-31 02-04
19-20 07-09 12-15 12-15 19-21 19-21 19-21 19-21 06-09 19-20 19-21 19-21 19-21 19-21 19-21
13-14 19-21 24-27 03-06 12-14 19-21 10-12 24-26 17-20 17-18 24-26 24-26 26-28 12-14 19-21
07-08 14-16 21-24 28-31 14-16 31-02 21-23 28-30 21-24 14-15 14-16 14-16 14-16 28-30 31-02
14-15 20-22 25-28 04-07 13-15 20-22 11-13 25-27 18-21 18-19 25-27 25-27 27-29 13-15 20-22
12-13 18-20 23-26 02-05 11-13 18-20 09-11 23-25 16-19 16-17 23-25 23-25 25-27 11-13 18-20
06-07 13-15 20-23 21-24 27-29 01-03 20-22 27-29 14-17 20-21 27-29 20-22 13-15 29-01 01-03
14-15 20-22 04-07 11-14 27-29 20-22 13-15 27-29 19-22 27-28 27-29 27-29 27-29 27-29 27-29
3.950.000 5.950.000 7.950.000 7.950.000 5.950.000 5.950.000 5.950.000 5.950.000 7.950.000 3.950.000 5.950.000 5.950.000 5.950.000 5.950.000 5.950.000
49
MENGGALI POTENSI DIRI UNTUK MENCAPAI PRIBADI YANG UNGGUL
2
09-10
06-07
20-21
10-11
22-23
19-20
10-11
24-25
11-12
09-10
20-21
27-28
3.950.000
3
11-13
08-10
13-15
11-13
15-17
19-21
12-14
14-16
13-15
11-13
13-15
13-15
5.950.000
3
02-04
30-01
27-29
03-05
22-24
19-21
03-05
14-16
04-06
02-04
27-29
27-29
5950000
3
25-27
22-24
27-29
26-28
31-02
12-14
26-28
28-30
27-29
25-27
27-29
27-29
5.950.000
3
25-27
22-24
01-03
26-28
03-05
19-21
26-28
02-04
27-29
25-27
01-03
27-29
5.950.000
50 51 52 53
PERFORMANCE, BEHAVIOR AND STRESS MANAGEMENT MANAGING PRESSURE FOR PEAK PERFORMANCE Stress Management Strategies HYPNO-PRESENTATION SKILL UNLOCKING YOUR POTENTIAL POWER
39
54 55 56 57 58 59
ICE BREAKER FOR EFFECTIVE TRAINING DELIVERY IMPROVING PERSONAL SKILL FOR SECRETARY & ADMINISTRATIVE ASSISTANT SEVEN HABITS WITH NLP APPROACH EMOTIONAL INTELLIGENCE FOR MENTAL ATTITUDE FINDING YOUR ESSENTIAL SELF INTERPERSONAL COMMUNICATION SKILL
3
04-06
01-03
08-10
05-07
10-12
07-09
05-07
09-11
06-08
04-06
08-10
06-08
5.950.000
3
09-11
06-08
15-17
10-12
17-19
12-14
10-12
14-16
11-13
09-11
15-17
13-15
5.950.000
3
25-27
22-24
20-22
26-28
22-24
12-14
26-28
21-23
27-29
25-27
20-22
27-29
5.950.000
3
09-11
06-08
22-24
10-12
22-24
07-09
10-12
23-25
11-13
09-11
22-24
11-13
5.950.000
3 2
23-25 26-27
20-22 23-24
27-01 27-28
24-26 27-28
02-04 01-02
19-21 07-08
24-26 27-28
31-02 30-31
25-27 28-29
23-25 26-27
30-01 27-28
27-29 27-28
5.950.000 3.950.000
60
DYNAMIC INTERPERSONAL & COMMUNICATION SKILLS
2
11-12
08-09
08-09
12-13
08-09
20-21
12-13
07-08
13-14
11-12
08-09
11-12
3.950.000
61
SELF-EFFECTIVENESS & DEVELOPMENT
2
02-03
30-31
20-21
03-04
22-23
07-08
03-04
24-25
04-05
02-03
20-21
06-07
3.950.000
62
PERSONALITY DEVELOPMENT BERBASIS EMOTIONAL AND SPRITUAL QUETIENTS
4
23-26
20-23
06-09
24-27
08-11
05-08
24-27
31-03
25-28
23-26
06-09
11-14
7.950.000
63 64
STRESS & CONFLICT MANAGEMENT BAHAGIA DAN PRODUKTIF SAAT PURNA BAKTI
3 5
16-18 02-06
13-15 30-03
20-22 27-31
17-19 03-07
22-24 08-12
19-21 05-09
17-19 03-07
21-23 31-04
18-20 04-08
16-18 02-06
20-22 27-01
18-20 11-15
5.950.000 8.950.000
65
CORPORATE BUILIDNG DALAM MEMBANGUN KULTUR DAN ETIKA INTERNAL ORGANISASI
4
16-19
13-16
06-09
17-20
02-05
13-16
17-20
07-10
18-21
16-19
06-09
18-21
7.950.000
66
MODEL PEMBINAAN ANGGOTA YANG EXCELLENT DALAM DUNIA KERJA PERUSAHAAN
3
16-18
13-15
27-29
17-19
31-02
19-21
17-19
29-31
18-20
16-18
27-29
18-20
5.950.000
67
Office COMMUNICATION AND BEHAVIOR ETHIC
3
04-06
01-03
06-08
05-07
08-10
19-21
05-07
07-09
06-08
04-06
06-08
04-06
5.950.000
68
CHANGE & CONFLICT MANAGEMENT AND DEALING WITH DIFFICULT PEOPLE
2
16-17
13-14
20-21
17-18
22-23
19-20
17-18
14-15
18-19
16-17
20-21
27-28
3.950.000
69
COLLABORATION MS Office AND EFFECTIVE PRESENTATION
3
04-06
01-03
27-01
05-07
02-04
19-21
05-07
31-02
06-08
04-06
30-01
04-06
5.950.000
70
Change & conflict management and dealing with difficult people
2
02-03
30-31
27-28
03-04
02-03
19-20
03-04
31-01
04-05
02-03
30-31
04-05
3.950.000
2 2 3 3 2
05-06 12-13 11-13 09-11 02-03
02-03 09-10 08-10 06-08 30-31
27-28 27-28 15-17 27-01 27-28
06-07 12-13 11-13 10-12 03-04
29-30 02-03 17-19 22-24 22-23
19-20 08-09 19-21 19-21 19-20
06-07 13-14 12-14 10-12 03-04
30-31 31-01 14-16 28-30 14-15
07-08 14-15 13-15 11-13 04-05
05-06 12-13 11-13 09-11 02-03
27-28 30-31 15-17 30-01 27-28
07-08 14-15 13-15 27-29 27-28
3.950.000 3.950.000 5.950.000 5.950.000 3.950.000
3
16-18
13-15
08-10
17-19
10-12
19-21
17-19
09-11
18-20
16-18
08-10
20-22
5.950.000
3
23-25
20-22
15-17
24-26
17-19
19-21
24-26
14-16
25-27
23-25
15-17
27-29
5.950.000
71 72 73 74 75 76 77
Strategic and Systematic Thinking THE LEADERSHIP CHALLENGE COACHING & CONSELING DI PERUSAHAAN COACHING AND COUNSELING ( MONITORING) PERFORMANCE COACHING FOR MANAGER EFFECTIVE PRESENTATION AND REPORT WRITING Effective Time Management
78
HANDLING CONFLICT AND COMPLAINT EFFECTIVELY
3
09-11
06-08
27-29
10-12
22-24
19-21
10-12
29-31
11-13
09-11
27-29
13-15
5.950.000
79 80 81
Strategic Time Management TIME MANAGEMENT HOW TO HANDLE CRITICISM AND COMPLAIN
3 4 2
18-20 16-19 23-24
15-17 13-16 20-21
20-22 28-03 06-07
19-21 17-20 24-25
22-24 02-05 08-09
07-09 05-08 15-16
19-21 17-20 24-25
23-25 01-04 07-08
20-22 18-21 25-26
18-20 16-19 23-24
20-22 31-03 06-07
18-20 18-21 27-28
5.950.000 7.950.000 3.950.000
40
Keterangan :
Seluruh judul training yang ada, apabila ada permintaan dapat kami selenggarakan sebagai Inhouse Training Jadwal terupdate dapat dilihat di website kami di http://www.mairodi-training.com atau di www.pelatihan-indonesia.com atau di www.training-bandung.com Venue Training : Kagum Group Hotel Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci, dll), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll Untuk korespondensi bisa dikirimkan via email :
[email protected] atau
[email protected]
41