CONSTRUCTION BULLETIN Sample Project of The Month Software Online Untuk marketing proyek Call : 021 5790 2930
About The Publication The BCI Asia Construction Bulletin - INDONESIA R071207 is published by: BCI Asia Construction Information Pte Ltd 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email
[email protected]
Website www.bciasia.com
Other offices: 6221 5790 2930 6231 8293056 844 537 8548 662 651 8600 848 997 4220 852 2538 0011 603 7661 1380 632 884 1122 612 9432 4100
Jakarta Surabaya Bangkok Hanoi Ho Chi Minh City Hong Kong Kuala Lumpur Manila Sydney
f f f f f f f f f
6221 5790 2933/34 6231 8293057 844 537 8549 662 651 8606
848 997 4150 852 2875 0511 603 7661 1381 632 884 1121 612 9432 4111
E-mail:
[email protected] E-mail:
[email protected] E-mail:
[email protected] E-mail:
[email protected] E-mail:
[email protected] E-mail:
[email protected] E-mail:
[email protected] E-mail:
[email protected] E-mail:
[email protected]
THE PUBLICATION BCI Asia Construction Bulletin reports on building and construction projects in Southeast Asia, Hong Kong, and Macau. Projects are researched locally by highly qualified in-house research staff. Projects are monitored from their inception through various phases of planning, design, tender and contract award through to early construction. PROJECT CATEGORIES Projects are classified into 19 categories for easier reference. Categories are defined as follows: Car Parks Community Education Exhibition Health Hotel Industrial Infrastructure Landscaping Legal Mining Office Oil and Gas Recreation Residential Retail Township Transport Utilities
Major car parks, approximately 50 bays or more. Child care centres, kindergartens, churches, mosques, temples, funeral parlours and cemeteries, libraries, community halls, meeting rooms, fire stations. Universities, colleges, schools, research centres and any buildings that have an educational function. Conference centres and exhibition halls. Hospitals, medical centres, surgeries (doctor/dental), pathology centres. Hotels, serviced apartments, motels, hostels and other forms of tourist accommodation. Factories, plants, workshops, warehouses and any other manufacturing and processing facilities. Roads, bridges, civil works, waterways, marinas, piers pipelines, subdivisions and tunnels. Significant landscaping component. Law courts, police stations and prisons. Mines (e.g. coal, gold, tin, copper) excluding oil and gas. Commercial and public offices. Oil and gas exploration and production. Sporting stadiums, sporting fields with clubrooms, swimming pools, tennis courts, cinemas, theme parks, tourist attractions, clubs, pubs, museums, art galleries and gardens. Apartments, townhomes, retirement homes, residential estates and houses. Shopping centres, supermarkets, shops, restaurants and cafes. Urban development. Control towers, freight/passenger terminal buildings and bus/rail interchanges. Water and sewerage plants, pipelines, telecommunications and power plants.
PROJECT STAGES Projects are listed in order of their stage of development. Stages are defined as follows: Competition Concept Design Documentation Tender Post Tender Construction
Architectural, interior and other construction-related design competitions Concept or schematic design is underway Project plans are being drafted for planning approval Specification and working drawings are being drafted Bids are being called for Main Contractor Tender has closed Main Contractor has commenced work on site. Main Contract Awarded or Subcontract(s) Tender Or Subcontract(s) Awarded
Copyright © 2013 BCI Asia Construction Information Pte Ltd. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form, or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of the publisher. All rights reserved. Printed in Singapore by BCI Asia Construction Information Pte Ltd. MICA (P) No.045/04/2009. Disclaimer: Every effort is made to ensure that information in this publication is accurate. However, no responsibility will be taken for any errors which may inadvertently occur.
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
i
About The Publication HOW TO READ A BCI ASIA CONTRUCTION BULLETIN
A typical page from BCI Asia Construction Bulletin. Illustrating the features and benefits. The simple concise lay out is easy to read and user friendly.
1. The type of project by major category, e.g. hostel, industrial , retail, office allows the user to identify the projects most relevant to him.
3. The project code- is a unique code for each project allowing the user to track the progress of a project, to add new information overtime and to assign the project to a specific sales representative.
2. The stage of the project gives up-to-date information on how far the project has advanced. 4. The project name and address – allows quick and reliable reference at a glance
5. Details of the projectprovided in English and Indonesian – contain up-to-date and accurate information on the project – thoroughly researched and updated whenever there is a significant changed in the development
6. The construction timetable – allows the user to stage his sales priorities
7. The Developer – often the most critical decision maker when it comes to a construction contact.
8. The key contacts – participants in the decision making process. With this list of verified names, addresses and telephone numbers, the user can save countless hours of searching and can go straight to making contact to win new business 9. The next tender to be awarded, typically the main contractor, who is invited to bid. At the later stage, the appointed contractor is announced as a key contact for interested sub-contractors.
THE BCI ASIA QUALITY PROMISE
Every project presented in BCI Asia Construction Bulletin has been research and personally or orally confirmed by a member of the BCI Asia research staff features at least one key decision maker with full contact details certain jobs or contracts that are yet to be assigned No project is included in BCI Asia Construction Bulletin unless it meets these minimum requirements.
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
ii
Sample Project of The Month PROJECT CATEGORY
Hotel/ Recreation/ Retail PROJECT STAGE
Competition
GREEN GARDEN REGENCY - SANTIKA HOTEL (4 STARS) (continued...)
PROJECT CODE
138791002
GREEN GARDEN REGENCY - SANTIKA HOTEL (4 STARS) Jalan Dr. Wahidin Sudirohusodo, Kompleks Perumahan Green Garden Regency, Gresik, East Java ● ● ● ● ● ●
Architect To be appointed Bidders include: Megatika International PT - Pos Pengumben Office Contact Mr Joe Louis Widodo (Design Director) 62 21 5365 1221 f 62 21 5365 0880 Email:
[email protected] Website: www.megatika.com Komplek Apartemen Permata Eksekutif, Gedung Kantor Lantai 3, Jalan Pos Pengumben, Jakarta Barat, 11550, Jakarta, Indonesia
9 storey hotel building (approx 8,670 sq m) Up to 110 hotel rooms Hotel lobby & reception lounge Dining & restaurant Banquet & function hall Swimming pool
Please find more information at www.greengardenregency.com
Structural Engineer To be appointed
Estimated cost: undisclosed.
Mechanical & Electrical Engineer To be appointed
Construction is expected to start in early December 2017. Construction is expected to end in early December 2018.
Contractor To be appointed
Bangunan hotel 9 lantai dengan luas bangunan sekitar 8.670 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Desember 2017 dan selesai Desember 2018. Developer Raya Bumi Nusantara Permai PT Contact Mr Yahya Wahono (Director) 62 31 395 9888 / 395 f 62 31 395 9888 0999 / 397 2953 Jalan Wahidin Sudirohusodo No. 788, Gresik, 61121, East Java, Indonesia Contact Mr Benny Darulie (Finance Manager) 62 31 395 9888 / 395 f 62 31 395 9888 0999 / 397 2953 Jalan Wahidin Sudirohusodo No. 788, Gresik, 61121, East Java, Indonesia Contact Mr Sudrajat (Staff of Project Division) 62 31 395 9888 / 395 f 62 31 395 9888 0999 / 397 2953 Jalan Wahidin Sudirohusodo No. 788, Gresik, 61121, East Java, Indonesia Hotel Operator Grahawita Santika PT - Head Office Contact Mr Andi Setiadi (Business Development Officer) 62 21 270 0027 / 548 f 62 21 270 0028 3008 Email:
[email protected] Website: www.santika.com Jalan Melawai VII No. 6-8, Kebayoran Baru, Jakarta Selatan, 12160, Jakarta, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
1
Sample Project of The Month PROJECT CATEGORY
PROJECT CATEGORY
Health
Residential/ Retail/ Recreation
PROJECT STAGE
Competition
PROJECT CODE
PROJECT STAGE
139250002
RSUD LEUWILIANG BOGOR HOSPITAL - INPATIENT CARE UNIT (CLASS III) Jalan Raya Cibeber, Keracak, Leuwiliang, Bogor, West Java ● ● ● ●
PROJECT CODE
Concept
139088002
ARCAMANIK PARK SUPERBLOCK APARTMENT TOWER 1 Jalan Pacuan Kuda, Arcamanik, Bandung, West Java ● ● ●
27 storey apartment tower (approx 35,000 sq m) Up to 450 apartment units Studio type apartments, single bedroom units, 2 bedroom units & 3 bedroom units ● Apartment lobby & reception lounge ● Ground floor retail shops & restaurants ● Swimming pool
3 storey hospital (approx 2,900 sq m) Inpatient care unit (150 beds) Registration area & waiting room Nurse station
Estimated cost: undisclosed. Construction is expected to start in early September 2016. Construction is expected to end in early December 2016.
Estimated cost: Rp175.00 bn (US$12.41 mn). Construction is expected to start in early December 2016. Construction is expected to end in late December 2018.
Bangunan unit rawat inap 3 lantai, dengan luas bangunan sekitar 2.900 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai September 2016 dan selesai Desember 2016.
Apartemen 27 lantai dengan luas bangunan sekitar 35.000 meter persegi. Perkiraan biaya: Rp 175 milyar. Konstruksi diharapkan mulai Desember 2016 dan selesai Desember 2018.
Developer Rumah Sakit Umum Daerah (RSUD) Leuwiliang Bogor Contact Ms Wiwik Wahyuningsih (Director) 62 251 864 3292 / 864 f 62 251 864 3291 3290 / 864 3293 Email:
[email protected] Website: www.rsudleuwiliang.bogorkab.go.id Jalan Raya Cibeber, Keracak, Leuwiliang, Bogor, 16640, West Java, Indonesia
Master Planner Alami Intermedia PT (Alami Group) Contact Mr Farid Ramdani (Project Manager / Architect) 62 22 203 3199 f 62 22 203 3199 Email:
[email protected] Website: www.alami-group.com Jalan Boscha No. 10, Bandung, 40161, West Java, Indonesia
Contact Mr Helmi Adam (Kepala PPK - Project Coordinator) 62 251 864 3292 / 864 f 62 251 864 3291 3290 / 864 3293 Email:
[email protected] Website: www.rsudleuwiliang.bogorkab.go.id Jalan Raya Cibeber, Keracak, Leuwiliang, Bogor, 16640, West Java, Indonesia
Contact Ms Stella Aninditawati (Architect) 62 22 203 3199 f 62 22 203 3199 Email:
[email protected] Website: www.alami-group.com Jalan Boscha No. 10, Bandung, 40161, West Java, Indonesia Architect To be appointed
Supervisory Consultant To be appointed Structural Engineer To be appointed Architect To be appointed Remarks: Qualification : Non small scale business. Qualification method : Pre-qualification. The aanwijzing (tender explanation) is scheduled on 17 October 2015.
Mechanical & Electrical Engineer To be appointed Contractor To be appointed
Tender opens on 15 September, 2015 and closes on 21 September, 2015. Tender Office Unit Layanan Pengadaan (ULP) Kabupaten Bogor Contact Mr Hendrik Suherman (Head of Tender Committee) 62 21 875 3355 f 62 21 875 3355 Website: www.bogorkab.go.id Jalan Nyaman No. 1, Harapan Jaya, Cibinong, Bogor, 16914, West Java, Indonesia Contractor To be appointed Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
2
Sample Project of The Month PROJECT CATEGORY
PROJECT CATEGORY
Industrial/ Office
Office
PROJECT STAGE
Concept
PROJECT CODE
PROJECT STAGE
139737002
Concept
ARTHA METAL SINERGI FACTORY Yet to be determined, Banten ● ● ●
PROJECT CODE
139356002
BANK PERKREDITAN RAKYAT BKK MUNTILAN Jalan Yasmudi No. 2 Muntilan, Magelang, Central Java ● ● ● ●
Single storey steel factory (capacity 1 mtpa) Warehouse Office
2 storey bank office building (approx 1,172 sq m) Customer counters Work stations & office space Meeting rooms
Estimated cost: undisclosed. Building elements include: ● Flooring : ceramic tile ● Ceiling : gypsum board ● Walling : brick walls ● Facade : aluminium composite cladding ● Roofing : concrete roof tile ● Roof truss : lightweight steel ● Aluminium framed doors & windows / solid wood doors
Construction timetable is to be determined. Pembangunan pabrik baja dengan kapasitas 1 juta ton per tahun. Perkiraan biaya : tidak dinyatakan. Waktu konstruksi belum ditentukan. Developer Artha Metal Sinergi PT Contact Mr Felix Effendi (Chief of Executive Officer) 62 21 5140 2381 f Not available Website: www.arthametal.com 18 Parc Place, Tower A Floor 6, Jalan Jendral Sudirman Kavling 52-53, Jakarta Selatan, 12190, Jakarta, Indonesia
Estimated cost: Rp5.09 bn (US$0.36 mn). Construction is expected to start in early June 2016. Construction is expected to end in early December 2016.
Contact Mr Heryanto (Staff of Business Development Division) 62 21 5140 2381 f Not available Website: www.arthametal.com 18 Parc Place, Tower A Floor 6, Jalan Jendral Sudirman Kavling 52-53, Jakarta Selatan, 12190, Jakarta, Indonesia
Gedung bank 2 lantai dengan luas bangunan sekitar 1.172 meter persegi. Perkiraan biaya: Rp 5,09 milyar. Konstruksi diharapkan mulai Juni 2016 dan diharapkan selesai Desember 2016. Developer Perusahaan Daerah Bank Perkreditan Rakyat (PD BPR) Bank Muntilan Contact Mr Anang Basori SP (President Director) 62 293 587 808 / 587 f 62 293 586 128 781 Email:
[email protected] Jalan Yasmudi No. 2 Muntilan, Magelang, 56411, Central Java, Indonesia
Contact Mrs Jessica Imandaris (Staff of Business Development Division) 62 21 5140 2381 f Not available Email:
[email protected] Website: www.arthametal.com 18 Parc Place, Tower A Floor 6, Jalan Jendral Sudirman Kavling 52-53, Jakarta Selatan, 12190, Jakarta, Indonesia Consulting Engineer To be appointed
Contact Mr Alaika Maddadina,SE (Director - Project Manager) 62 293 587 808 / 587 f 62 293 586 128 781 Email:
[email protected] Jalan Yasmudi No. 2 Muntilan, Magelang, 56411, Central Java, Indonesia
EPC Contractor To be appointed
Supervisory Consultant To be appointed Architect Kala Prana Konsultan PT Contact Ms Sri Hartati Wulandari (President Director) 62 274 412 563 f 62 274 412 563 Email:
[email protected] Jalan Wonocatur KD IV No. 250, RT 01 / RW 23 , Banguntapan, Bantul, 55198, DI Yogyakarta, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
3
Sample Project of The Month PROJECT CATEGORY
Residential/ Hotel/ Retail/ Recreation BANK PERKREDITAN RAKYAT BKK MUNTILAN (continued...)
PROJECT STAGE
Concept
PROJECT CODE
138923002
DIALOOG HOTEL SEMINYAK (4 STARS) Jalan Petitenget, Mangupura, Bali
Contact Mr Tarman (Director - Principal Architect) 62 274 412 563 f 62 274 412 563 Email:
[email protected] Jalan Wonocatur KD IV No. 250, RT 01 / RW 23 , Banguntapan, Bantul, 55198, DI Yogyakarta, Indonesia
● ● ● ● ● ● ● ● ●
Contractor To be appointed
3 storey apartment & hotel building (approx 8,000 sq m) Up to 120 hotel rooms Hotel lobby & reception lounge Restaurant & Coffee shop Bar club Spa & gym Commercial area Clubhouse Swimming pool
Estimated cost: undisclosed. Construction is expected to start in early June 2016. Construction is expected to end in late June 2017. Kondotel 3 lantai dengan luas bangunan sekitar 8.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Juni 2016 dan selesai Juni 2017. Developer Bukit Uluwatu Villa Tbk PT Contact Mr Hendry Utomo (Director) 62 21 759 24475 / 759 f 62 21 759 24476 24723 Email:
[email protected] Website: www.buvagroup.com Telavera Office Park 12th Floor, Jalan TB Simatupang Kavling 22 - 26, Cilandak, Jakarta Selatan, 12560, Jakarta, Indonesia Hotel Operator Bukit Uluwatu Villa Tbk PT Contact Mr Nyoman Tri Suryanegara Lingga (Hotel Operation Director) 62 21 759 24475 / 759 f 62 21 759 24476 24723 Email:
[email protected] Website: www.buvagroup.com Telavera Office Park 12th Floor, Jalan TB Simatupang Kavling 22 - 26, Cilandak, Jakarta Selatan, 12560, Jakarta, Indonesia Architect To be appointed Interior Designer To be appointed Structural Engineer To be appointed Mechanical & Electrical Engineer To be appointed Contractor To be appointed
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
4
Sample Project of The Month PROJECT CATEGORY
PROJECT CATEGORY
Residential/ Recreation/ Car Park
Hotel/ Car Park/ Retail
PROJECT STAGE
Concept
PROJECT CODE
PROJECT STAGE
139127002
Concept
EQUATOR APARTMENT NGAGEL - TOWER 1 Jalan Raya Ngagel, Surabaya, East Java ● ● ● ● ●
PROJECT CODE
139307002
GRAND ESTATE MARINA CITY - IBIS HOTEL ( 3 STARS ) Pelabuhan Manyar, Kecamatan Manyar, Gresik, East Java
40 storey apartment building on top of 4 storey shopping centre (approx 56,000 sq m) Up to 600 apartment units Car park Apartment lobby & reception lounge Swimming pool
● ● ● ● ● ●
Estimated cost: undisclosed. Construction is expected to start in early January 2018. A completion date is to be determined.
12 storey hotel building (approx 9,800 sq m) Up to 250 hotel rooms Hotel lobby & reception lounge Dining & restaurant Banquet & function hall Car park
Estimated cost: Rp80.00 bn (US$5.67 mn). Construction is expected to start in early August 2016. Construction is expected to end in early June 2018.
Apartemen 40 lantai dengan luas bangunan sekitar 56.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Januari 2018. Waktu penyelesaian belum ditentukan.
Bangunan hotel 12 lantai dengan luas bangunan sekitar 9.800 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Agustus 2016 dan selesai Juni 2018.
Developer Sinarmas Land Contact Mr Ishak Chandra (Managing Director Corporate Strategy & Services) 62 21 5036 8368 f 62 21 5038 0000 Email:
[email protected] Website: www.sinarmasland.com Sinarmas Land Plaza, Grand Boulevard, BSD Green Office Park Serpong, Tangerang Selatan, 15345, Banten, Indonesia
Developer Pelabuhan Indonesia III (Persero) PT Contact Mr Husein Latif (Technical & Information Technology Director) 62 31 329 8631 / 329 f 62 31 329 5204 / 329 8634 5207 Email:
[email protected] Website: www.pp3.co.id Jalan Tanjung Perak Timur No. 610, Surabaya, 60165, East Java, Indonesia
Architect Anggara Architeam PT Contact Mr Adri Rahadian Hanafi (Director / Project Architect) 62 21 8370 6091 / f 62 21 8370 1757 8370 5334 Email:
[email protected] Website: www.anggara.co.id Jalan Tebet Barat II No. 12 B, Jakarta Selatan, 12810, Jakarta, Indonesia
Berkah Kawasan Manyar Sejahtera PT / Berlian Manyar Sejahtera PT Contact Mr Nuki Hartanto (Staff of Planning Division ( Master Planner )) 62 31 504 4587 f 62 31 505 4006 Email:
[email protected] Website: www.jiipe.com Jalan Sumatera No. 45, Surabaya, 60281, East Java, Indonesia
Contact Mr Putu Suwirtayasa (Project Manager - Architect) 62 21 8370 6091 / f 62 21 8370 1757 8370 5334 Email:
[email protected] Website: www.anggara.co.id Jalan Tebet Barat II No. 12 B, Jakarta Selatan, 12810, Jakarta, Indonesia
AKR Land Development PT Contact Mr Widijanto (Managing Director) 62 21 531 1555 / 530 f 62 21 531 1228 8999 Email:
[email protected] Website: www.akrland.com Wisma AKR 5th Floor, Jalan Panjang No. 5 Kebun Jeruk, Jakarta Barat, 11530, Jakarta, Indonesia
Structural Engineer To be appointed Mechanical & Electrical Engineer To be appointed Quantity Surveyor To be appointed Contractor To be appointed
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
5
Sample Project of The Month PROJECT CATEGORY
Transport/ Retail/ Infrastructure GRAND ESTATE MARINA CITY - IBIS HOTEL ( 3 STARS ) (continued...)
PROJECT STAGE
Concept
PROJECT CODE
139372002
KUPANG INTERNATIONAL AIRPORT Site yet to be determined, Kupang, East Nusa Tenggara
AKR Land Development (Metafora International PT) - Cabang Surabaya Contact Mr Memed Permadi (Project Manager) 62 31 501 2999 f 62 31 503 7999 Email:
[email protected] Website: www.akrland.com Jalan Gubeng No. 44, Surabaya, 60281, East Java, Indonesia
● ● ●
2 storey passenger terminal (approx 30,000 sq m) Runway, apron, taxiway Commercial & retail space
Estimated cost: undisclosed. Construction is expected to start in early June 2018. A completion date is to be determined.
Hotel Operator Accor Asia Pacific Indonesia PT Contact Ms Iva Anggraini (Design & Technical Services Manager) 62 21 574 4414 / 574 f 62 21 574 4405 4415 Email:
[email protected] Website: www.accorhotels.com/Indonesia Wisma BNI 46 Lantai 14, Jalan Jendral Sudirman, Kavling 1, Jakarta Selatan, 12190, Jakarta, Indonesia
Perencanaan bandara baru meliputi: terminal penumpang 2 lantai dengan luas bangunan sekitar 30.000 meter persegi, runway, apron, taxiway dan fasilitas komersial. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Juni 2018. Waktu penyelesaian belum ditentukan. Government Implementing Agency Pemerintah Propinsi Nusa Tenggara Timur - Unit layanan Pengadaan (ULP) Contact Mr Boby L. Da Costa (Secretary of Tender Committee - Staff of Project Division) 62 380 833 341 f 62 380 829 283 Jalan Basuki Rahmat No. 1, Naikoten, Kupang, 85111, East Nusa Tenggara, Indonesia
Master Planner Indokoei International Consultant Engineering Contact Undisclosed 62 21 723 7620 f 62 21 7279 6068 Email:
[email protected] Website: www.indokoei.co.id Jalan Sultan Hasanuddin No 45, Kebayoran Baru, Jakarta Selatan, 12160, Jakarta, Indonesia
Structural Engineer To be appointed
Dinas Perhubungan Propinsi Nusa Tenggara Timur Contact Mr Arnold (Staff of General Division) 62 380 831 321 / 833 f 62 381 831 753 691 Website: www.nttprov.go.id Jalan Palapa No 17, Kupang, 85111, East Nusa Tenggara, Indonesia
Mechanical & Electrical Engineer To be appointed
Supervisory Consultant To be appointed
Quantity Surveyor To be appointed
Master Planner To be appointed Remarks: Qualification : Non small scale business. Qualification method : Post-qualification. The aanwijzing (tender explanation) is scheduled on 23 September 2015.
Architect To be appointed Interior Designer To be appointed
Piling Contractor To be appointed Earthworks Contractor Van Oord Indonesia PT Contact Undisclosed 62 21 2938 0919 f 62 21 2938 0929 Email:
[email protected] Website: www.vanoord.com Multivision Tower Building Messanine Floor Jalan Kuningan Mulia Lot 9B Guntur, Setiabudi, Jakarta Selatan, 12980, Jakarta, Indonesia
Tender opens on 21 September, 2015 and closes on 25 September, 2015. Architect To be appointed Tender Office Pemerintah Propinsi Nusa Tenggara Timur Unit layanan Pengadaan (ULP) Contact Mr S. Y. H. Touselak (Head of Tender Committee) 62 380 833 341 f 62 380 829 283 Jalan Basuki Rahmat No. 1, Naikoten, Kupang, 85111, East Nusa Tenggara, Indonesia
Contractor To be appointed
Contact Mr Benjamin M. Uly (Secretary of Tender Committee) 62 380 833 341 f 62 380 829 283 Jalan Basuki Rahmat No. 1, Naikoten, Kupang, 85111, East Nusa Tenggara, Indonesia Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
6
Sample Project of The Month PROJECT CATEGORY
Retail KUPANG INTERNATIONAL AIRPORT (continued...)
PROJECT STAGE
PROJECT CODE
Concept Contractor To be appointed
138854002
LIVING PLAZA - BOGOR Jalan H. Sholeh Iskandar, Bogor, West Java ● ● ●
4 storey shopping centre (approx 15,000 sq m) Retail shops & outlets Food court & restaurants
Building elements include: ● Flooring : ceramic tile / homogeneous tile / hardened concrete floor ● Structural : reinforced concrete ● Ceiling : gypsum board / metal ceiling ● Walling : light brick walls / precast concrete panel ● Facade : glass wall cladding / decorative cladding ● Roofing : concrete slab roof / metal sheet roof ● Roof truss : steel frame ● Aluminium framed doors & windows / automatic sliding doors ● Lifts / escalators ● Duct connected air conditioning Estimated cost: undisclosed. Construction started in early September 2015. Construction is expected to end in early May 2016. Pusat perbelanjaan 4 lantai, dengan luas bangunan sekitar 15.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai September 2015 dan selesai Mei 2016. Developer Ace Hardware Indonesia PT (Kawan Lama Group) Contact Mr Edy Awaluddin (Head of Project Management / Project Manager) 62 21 582 8282 / 582 f 62 21 582 2288 1818 Website: www.acehardware.co.id Kawan Lama Building Lantai 6, Jalan Puri Kencana No. 1 Kembangan, Jakarta Barat, 11610, Jakarta, Indonesia Local Architect Ace Hardware Indonesia PT (Kawan Lama Group) Contact Mr Krisdianto Pambagyo (Project Design Staff) 62 21 582 8282 / 582 f 62 21 582 2288 1818 Website: www.acehardware.co.id Kawan Lama Building Lantai 6, Jalan Puri Kencana No. 1 Kembangan, Jakarta Barat, 11610, Jakarta, Indonesia Foreign Architect Urban Architect Co Ltd Contact Mr Achariya Rojanapirom (Principal Architect) 662 248 4581 - 6 f 662 641 8565 Email:
[email protected] Website: www.urban.co.th 1143 Ratchadapisek 3 Dindaeng Bangkok, Bangkok, Thailand Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
7
Sample Project of The Month PROJECT CATEGORY
Residential/ Car Park/ Retail/ Recreation LIVING PLAZA - BOGOR (continued...)
PROJECT STAGE
Concept Structural Engineer To be appointed
PROJECT CODE
139225002
MADISON AVENUE - TOWER 1 Jalan Kutisari Besar, Surabaya, East Java
Mechanical & Electrical Engineer To be appointed
● ● ●
Quantity Surveyor To be appointed Contractor To be appointed
● ● ● ●
24 storey apartment building (approx 37,500 sq m) Up to 570 apartment units Studio type apartment units, 2 bedroom units, 3 bedroom units Car park Apartment lobby & reception lounge Ground floor retail shops & restaurants Integrated swimming pool
Estimated cost: undisclosed. Construction is expected to start in early January 2017. Construction is expected to end in early December 2017. Apartemen 24 lantai dengan luas bangunan sekitar 37.500 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Januari 2017 dan selesai Desember 2017. Land Owner Gala Bumiperkasa PT Contact Mr Junaedi (Project Director) 62 31 548 1666 / 568 f 62 31 548 1555 / 568 2371 2371 Jalan Panglima Sudirman No. 55, Surabaya, 60271, East Java, Indonesia Developer Kertabhakti Raharja PT Contact Mrs Iuneke Anggraeni (Director) 62 31 866 6666 f 62 31 867 0888 Email:
[email protected] Jalan Permata Juanda Blok A No. 5, Sidoarjo, 61253, East Java, Indonesia Contact Mrs Rika Kristina (General Manager) 62 31 866 6666 f 62 31 867 0888 Email:
[email protected] Jalan Permata Juanda Blok A No. 5, Sidoarjo, 61253, East Java, Indonesia Surya Inti Permata PT Contact Mr Henry J Gunawan (Managing Director) 62 31 548 1666 f 62 31 567 1618 Email:
[email protected] Website: www.siip.co.id Jalan Kombes Pol. M. Duryat 14-16 Blok B No. 16-17, Surabaya, 60271, East Java, Indonesia Contact Mr Yandi Candra (Head of Planning Division Project Manager) 62 31 568 2374 f 62 31 568 2370 Website: www.siip.co.id Jalan Putat Indah No. 1a, Surabaya, 60222, East Java, Indonesia Architect To be appointed Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
8
Sample Project of The Month PROJECT CATEGORY
Community/ Health MADISON AVENUE - TOWER 1 (continued...)
PROJECT STAGE
Concept Structural Engineer To be appointed
PROJECT CODE
138195002
RSUD CIBINONG HOSPITAL - MORTUARY BUILDING Jalan KSR Dadi Kusmayadi No. 27, Cibinong, Bogor, West Java
Mechanical & Electrical Engineer To be appointed Quantity Surveyor To be appointed
● ● ● ●
Contractor To be appointed
2 storey mortuary building (approx 900 sq m) Autopsy & embalming room Praying hall Administration office
Building elements include: ● Flooring : ceramic tile ● Structural : reinforced concrete ● Walling : light brick walls ● Roofing : concrete roof tile / metal sheet roof ● Roof truss : steel frame ● Aluminium framed doors & windows / fabricated wood doors ● Crematorium equipment ● Sanitary ware / plumbing Estimated cost: undisclosed. Construction is expected to start in early September 2016. Construction is expected to end in early December 2016. Gedung rumah sakit 2 lantai dengan luas bangunan sekitar 900 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai September 2016 dan selesai Desember 2016. Developer Rumah Sakit Umum Daerah (RSUD) Cibinong Contact Ms Tri Wahyu Harini (Director / Project Coordinator) 62 21 875 3360 / 875 f 62 21 8790 6194 348 Email:
[email protected] Website: rsudcibinong.bogorkab.go.id Jalan KSR Dadi Kusmayadi No. 27, Cibinong, Bogor, 16194, West Java, Indonesia Contact Ms Dini Susanti Hasanti, MM (PPK - Project Manager) 62 21 875 3360 / 875 f 62 21 8790 6194 348 Email:
[email protected] Website: rsudcibinong.bogorkab.go.id Jalan KSR Dadi Kusmayadi No. 27, Cibinong, Bogor, 16194, West Java, Indonesia Supervisory Consultant To be appointed
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
9
Sample Project of The Month PROJECT CATEGORY
Health RSUD CIBINONG HOSPITAL - MORTUARY BUILDING (continued...)
PROJECT STAGE
Concept
PROJECT CODE
139151002
RSUD SURADADI HOSPITAL Jalan Raya Tegal - Pemalang Km. 12, Kabupaten Tegal, Central Java
Architect Cipta Rancang Mandiri PT Contact Mr Freddy Ahadiat (Director) 62 21 786 9861 f 62 21 830 8710 Email:
[email protected] Jalan Universitas Pancasila No. 24 RT 002 / 004, Srengseng Sawah, Jagakarsa, Jakarta Selatan, 12820, Jakarta, Indonesia
● ● ● ● ● ● ● ● ●
Contact Ms Vidiana Diah (Project Coordinator / Architect) 62 21 786 9861 f 62 21 830 8710 Email:
[email protected] Jalan Universitas Pancasila No. 24 RT 002 / 004, Srengseng Sawah, Jagakarsa, Jakarta Selatan, 12820, Jakarta, Indonesia
3 storey hospital (approx 3,500 sq m) Up to 120 inpatient beds Emergency unit Polyclinic Maternity clinic Patient recovery rooms Medical consulting rooms Waiting room Pharmacy room
Estimated cost: undisclosed.
Contractor To be appointed
Construction is expected to start in early March 2016. Construction is expected to end in late December 2016. Pembangunan rumah sakit umum 3 lantai dengan luas bangunan sekitar 3.500 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Maret 2016 dan selesai Desember 2016. Government Implementing Agency Dinas Pekerjaan Umum Kabupaten Tegal Contact Mr Sugiyanto ST, MT (Head Officer) 62 283 619 7503 / 619 f Not available 7673 Jalan Cut Nyak Dien No. 13, Kecamatan Slawi, Kabupaten Tegal, 52419, Central Java, Indonesia Developer Rumah Sakit Umum Daerah (RSUD) Suradadi Contact Mr Drg. Dwi Raharjo, MM (Director) 62 283 453 2151 f 62 283 453 2183 Email:
[email protected] Jalan Raya Tegal - Pemalang Km. 12, Kabupaten Tegal, 52182, Central Java, Indonesia Contact Mr Sri Harso Pamoro, SKM.MM (Pejabat Pembuat Komitmen (PPK)) 62 283 453 2151 f 62 283 453 2183 Email:
[email protected] Jalan Raya Tegal - Pemalang Km. 12, Kabupaten Tegal, 52182, Central Java, Indonesia Contact Mr Setiyo Ragil, A.Md (Member of Tender Committee) 62 283 453 2151 f 62 283 453 2183 Email:
[email protected] Jalan Raya Tegal - Pemalang Km. 12, Kabupaten Tegal, 52182, Central Java, Indonesia Supervisory Consultant To be appointed Master Planner To be appointed Bidders include:
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
10
Sample Project of The Month PROJECT CATEGORY
Residential/ Hotel/ Recreation RSUD SURADADI HOSPITAL (continued...)
PROJECT STAGE
Concept Medisain Dadi Sempurna PT Contact Ms Lies Herawati (Director - Principal Architect) 62 24 850 0237 / 7070 f 62 24 850 0237 3390 Email:
[email protected] Jalan Tumpang Raya No. 50, Semarang, 50233, Central Java, Indonesia
PROJECT CODE
139129002
SUMMARECON BALI CONDOTEL Site yet to be determined, Badung, Bali ●
4 storey apartment & hotel building (approx 20,000 sq m) ● Up to 200 apartment units & hotel rooms ● Lobby & reception lounge ● Swimming pool
Architect To be appointed
Estimated cost: undisclosed.
Tender Office Pemerintah Kabupaten Tegal - Unit Layanan Pengadaan (ULP) Contact Mr Drs Sholikhin, MM (Head of Tender Comittee) 62 283 492 088 / 491 f 62 283 491 670 764 Website: www.tegalkab.go.id Jalan Dr. Soetomo No. 01, Kecamatan Slawi, Kabupaten Tegal, 52419, Central Java, Indonesia
Construction is expected to start in early January 2018. Construction is expected to end in late July 2019. Kondotel 4 lantai dengan luas bangunan sekitar 20.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Januari 2018 dan selesai Juli 2019. Developer Summarecon Agung Tbk PT Contact Mr Dwi Putranto (Design Coordinator / Project Manager) 62 21 471 4567 f 62 21 471 4474 Email:
[email protected] Website: www.summarecon.com Jalan Perintis Kemerdekaan No 42, Summarecon Plaza Lantai 7, Kelapa Gading, Jakarta Timur, 13210, Jakarta, Indonesia
Contractor To be appointed
Contact Ms Rosalynn Wilona (Architect) 62 21 471 4567 f 62 21 471 4474 Email:
[email protected] Website: www.summarecon.com Jalan Perintis Kemerdekaan No 42, Summarecon Plaza Lantai 7, Kelapa Gading, Jakarta Timur, 13210, Jakarta, Indonesia Master Planner To be appointed Architect To be appointed Structural Engineer To be appointed Mechanical & Electrical Engineer To be appointed Contractor To be appointed
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
11
Sample Project of The Month PROJECT CATEGORY
Hotel/ Retail/ Recreation/ Car Park PROJECT STAGE
SUMMARECON BANJARMASIN - HOTEL (4 STARS) (continued...)
PROJECT CODE
Concept
138834002
SUMMARECON BANJARMASIN - HOTEL (4 STARS) Jalan Jendral Ahmad Yani, Banjarmasin, South Kalimantan ● ● ● ● ● ● ●
Contact Ms Rosalynn Wilona (Architect) 62 21 471 4567 f 62 21 471 4474 Email:
[email protected] Website: www.summarecon.com Jalan Perintis Kemerdekaan No 42, Summarecon Plaza Lantai 7, Kelapa Gading, Jakarta Timur, 13210, Jakarta, Indonesia
20 storey hotel building (approx 28,000 sq m) 300 hotel rooms Hotel lobby & reception lounge Dining & restaurant Banquet & function hall Swimming pool Car park
Hotel Operator To be appointed Architect Bias Tekno Art Kreasindo PT Contact Mr Sardjono Sani (Director) 62 21 765 9221 / 765 f 62 21 765 9220 9223 Email:
[email protected] Website: www.biasteknoart.com Rukan Fatmawati Mas Kavling 324-6, Jalan RS Fatmawati No. 20, Jakarta Selatan, 12430, Jakarta, Indonesia
Building elements include: ● Flooring : ceramic tile / homogeneous tile / wood flooring / carpet ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : light brick walls / precast concrete panels ● Facade : glass wall cladding / aluminium composite cladding ● Roofing : concrete slab roof ● Aluminium framed doors & windows / fabricated wood doors ● Lifts ● Duct connected air conditioning ● Fire protection system ● Security system ● Sanitary ware / plumbing ● Building automation system
Contact Mr Chikman Najib (Architect) 62 21 765 9221 / 765 f 62 21 765 9220 9223 Email:
[email protected] Website: www.biasteknoart.com Rukan Fatmawati Mas Kavling 324-6, Jalan RS Fatmawati No. 20, Jakarta Selatan, 12430, Jakarta, Indonesia Structural Engineer To be appointed
Estimated cost: Rp150.00 bn (US$10.63 mn).
Mechanical & Electrical Engineer To be appointed
Construction is expected to start in early March 2017. Construction is expected to end in late December 2018.
Quantity Surveyor To be appointed Contractor To be appointed
Bangunan hotel 20 lantai, dengan luas bangunan sekitar 28.000 meter persegi. Perkiraan biaya: Rp 150 milyar. Konstruksi diharapkan mulai Maret 2017 dan selesai Desember 2018. Developer Summarecon Agung Tbk PT Contact Mr Dwi Putranto (Design Coordinator / Project Manager) 62 21 471 4567 f 62 21 471 4474 Email:
[email protected] Website: www.summarecon.com Jalan Perintis Kemerdekaan No 42, Summarecon Plaza Lantai 7, Kelapa Gading, Jakarta Timur, 13210, Jakarta, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
12
Sample Project of The Month PROJECT CATEGORY
Retail/ Car Park PROJECT STAGE
Concept
SUMMARECON BANJARMASIN - SHOPPING MALL (continued...)
PROJECT CODE
138832002
SUMMARECON BANJARMASIN - SHOPPING MALL Jalan Jendral Ahmad Yani, Banjarmasin, South Kalimantan ● ● ● ●
Architect Bias Tekno Art Kreasindo PT Contact Mr Sardjono Sani (Director) 62 21 765 9221 / 765 f 62 21 765 9220 9223 Email:
[email protected] Website: www.biasteknoart.com Rukan Fatmawati Mas Kavling 324-6, Jalan RS Fatmawati No. 20, Jakarta Selatan, 12430, Jakarta, Indonesia
4 storey shopping centre (approx 40,000 sq m) Retail shops & outlets Food court & restaurants Car park
Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : light brick walls / precast concrete panels ● Facade : glass wall cladding / aluminium composite cladding ● Roofing : concrete slab roof ● Aluminium framed doors & windows / fabricated wood doors / rolling doors ● Lifts / escalators ● Duct connected air conditioning ● Fire protection system ● Security system ● Sanitary ware / plumbing ● Building automation system
Contact Mr Chikman Najib (Architect) 62 21 765 9221 / 765 f 62 21 765 9220 9223 Email:
[email protected] Website: www.biasteknoart.com Rukan Fatmawati Mas Kavling 324-6, Jalan RS Fatmawati No. 20, Jakarta Selatan, 12430, Jakarta, Indonesia Structural Engineer To be appointed Mechanical & Electrical Engineer To be appointed Quantity Surveyor To be appointed Contractor To be appointed
Estimated cost: undisclosed. Construction is expected to start in early March 2017. Construction is expected to end in late December 2018. Pusat perbelanjaan 4 lantai, dengan luas bangunan sekitar 40.000 meter persegi. Perkiraan biaya: Rp 350 milyar. Konstruksi diharapkan mulai Maret 2017 dan selesai Desember 2018. Developer Summarecon Agung Tbk PT Contact Mr Dwi Putranto (Design Coordinator / Project Manager) 62 21 471 4567 f 62 21 471 4474 Email:
[email protected] Website: www.summarecon.com Jalan Perintis Kemerdekaan No 42, Summarecon Plaza Lantai 7, Kelapa Gading, Jakarta Timur, 13210, Jakarta, Indonesia Contact Ms Rosalynn Wilona (Architect) 62 21 471 4567 f 62 21 471 4474 Email:
[email protected] Website: www.summarecon.com Jalan Perintis Kemerdekaan No 42, Summarecon Plaza Lantai 7, Kelapa Gading, Jakarta Timur, 13210, Jakarta, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
13
Sample Project of The Month PROJECT CATEGORY
Hotel/ Recreation/ Residential PROJECT STAGE
TRUMP RESORT TANAH LOT (6 STARS) (continued...)
PROJECT CODE
Concept
139024002
TRUMP RESORT TANAH LOT (6 STARS) Jalan Raya Tanah Lot, Tabanan, Bali ● ● ● ● ● ● ● ●
Contact Mr Peter Barrett (Director) 65 6734 4733 f 65 6734 6233 Email:
[email protected] Website: www.aedas.com 250 Tanjung Pagar Road, #09 Level, St Andrews Center, Singapore, Singapore 088541
4 storey hotel building (approx 16,000 sq m) Up to 200 hotel rooms Villas Condominium hotel Hotel lobby & reception lounge Dining & restaurant Fitness centre, spa Swimming pool
Architect To be appointed Interior Designer To be appointed
Estimated cost: undisclosed.
Structural Engineer To be appointed
Construction is expected to start in early October 2016. Construction is expected to end in late June 2018.
Mechanical & Electrical Engineer To be appointed Construction Manager To be appointed
Kawasan resort yang terdiri dari hotel 4 lantai, villa, condotel & fasilitas pendukung lainnya, dengan luas bangunan sekitar 16.000 meter persegi. Perkiraan biaya : tidak dinyatakan. Konstruksi diharapkan mulai Oktober 2016 dan selesai Juni 2018.
Contractor To be appointed
Developer MNC Land Tbk PT Contact Ms Tintin Marlina (Project Manager) 62 21 392 7471 f 62 21 392 1227 Email:
[email protected] Website: www.mncland.com MNC Tower Lantai 17 Suite 1703, Jalan Kebon Sirih No. 17-19, Jakarta Pusat, 10340, Jakarta, Indonesia Contact Mr Michael S. Dharmajaya (Director) 62 21 392 9828 / 392 f 62 21 392 1227 7471 Email:
[email protected] Website: www.mncland.com MNC Tower Lantai 17 Suite 1703, Jalan Kebon Sirih No. 17-19, Jakarta Pusat, 10340, Jakarta, Indonesia Hotel Operator Trump Hotel Collection Contact Mr Donald Trump Jr. (Executive Vice President of Development and Acquisitions) 1 855 878 6700 f Not available Email:
[email protected] Website: www.trumphotelcollection.com 725 Fifth Avenue, New York, 10022, U.S.A. Master Planner Aedas Pte Ltd Contact Mr Tonny Ang Kong Siong (Managing Director) 65 6734 4733 f 65 6734 6233 Email:
[email protected] Website: www.aedas.com 250 Tanjung Pagar Road, #09 Level, St Andrews Center, Singapore, Singapore 088541
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
14
Sample Project of The Month PROJECT CATEGORY
Recreation/ Education and Research PROJECT STAGE
Concept
UNIVERSITAS PENDIDIKAN INDONESIA (UPI) BANDUNG - GYMNASIUM BUILDING (PHASE 2) (continued...)
PROJECT CODE
139118002
UNIVERSITAS PENDIDIKAN INDONESIA (UPI) BANDUNG - GYMNASIUM BUILDING (PHASE 2) Jalan Dr. Setiabudhi No. 229, Bandung, West Java
Architect Kreasi Cemerlang Nusantara PT Contact Ms Ami Sutisna (Director) 62 22 662 7899 / 662 f 62 22 662 7899 6671 Email:
[email protected] Website: www.kcnconsultant.co.id Jalan Tutwuri Handayani No 2, Citeureup, Bandung, 16810, West Java, Indonesia
●
Single storey gymnasium building (approx. 1,700 sq m) ● Hockey court ● Tribune ● Locker room Building elements include: ● Flooring : synthetic floor / hardened floor ● Structural : concrete construction ● Ceiling : gypsum board / metal ceiling ● Walling : brick walls ● Roofing : metal sheet roofing ● Roof truss : steel frame ● Timber framed doors & windows / solid wood doors / folding gate ● Sanitary ware / plumbing
Contact Mr Widiawan (Project Coordinator) 62 22 662 7899 / 662 f 62 22 662 7899 6671 Email:
[email protected] Website: www.kcnconsultant.co.id Jalan Tutwuri Handayani No 2, Citeureup, Bandung, 16810, West Java, Indonesia Contact Mr Reza Azhari (Project Administrator) 62 22 662 7899 / 662 f 62 22 662 7899 6671 Email:
[email protected] Website: www.kcnconsultant.co.id Jalan Tutwuri Handayani No 2, Citeureup, Bandung, 16810, West Java, Indonesia
Estimated cost: Rp6.80 bn (US$0.48 mn). Construction is expected to start in early June 2016. Construction is expected to end in late December 2016. Gedung gedung olahraga satu lantai dengan luas bangunan sekitar 1.700 meter persegi. Perkiraan biaya: Rp 6,80 milyar. Konstruksi diharapkan mulai Juni 2016 dan selesai Desember 2016.
Contractor To be appointed
Developer Universitas Pendidikan Indonesia (UPI) Bandung Contact Mr H. Adang Fauzi (Kepala PPK - Project Coordinator) 62 22 201 3163 / 201 f 62 22 201 3651 / 202 3161 0215 Email:
[email protected] Website: www.upi.edu Jalan Dr Setiabudhi No. 229, Bandung, 40154, West Java, Indonesia Contact Mr Aep Suherlan (Building Development Staff) 62 22 201 3163 / 201 f 62 22 201 3651 / 202 3161 0215 Email:
[email protected] Website: www.upi.edu Jalan Dr Setiabudhi No. 229, Bandung, 40154, West Java, Indonesia Supervisory Consultant To be appointed
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
15
Sample Project of The Month PROJECT CATEGORY
Hotel/ Retail/ Recreation/ Car Park PROJECT STAGE
Design
ASTON HOTEL TASIK (4 STARS) (continued...)
PROJECT CODE
139530002
ASTON HOTEL TASIK (4 STARS) Jalan R. E. Martadinata, Tasikmalaya, West Java ● ● ● ● ● ● ●
Contact Mr Erik Setiawan (Project Manager) 62 22 7070 0366 f 62 22 7070 0366 Email:
[email protected] Website: www.farchitect.com Jalan Dharma Sakti No. 47, Kompleks Singgasana Pradana, Bandung, 40236, West Java, Indonesia
7 storey hotel building (approx 19,000 sq m) Up to 165 hotel rooms Single basement level car park Hotel lobby & reception lounge Dining & restaurant Banquet & function hall Swimming pool
Structural Engineer To be appointed Mechanical & Electrical Engineer To be appointed
Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board / acoustical ceiling ● Walling : light brick walls ● Facade : glass wall cladding / aluminium composite cladding ● Roofing : concrete slab roof ● Aluminium framed doors & windows / fabricated wood doors ● Lifts ● Split type air conditioning / duct connected air conditioning ● Fire protection system ● Security system ● Sanitary ware ● Building automation system
Contractor To be appointed
Estimated cost: Rp76.00 bn (US$5.39 mn). Construction is expected to start in early September 2016. Construction is expected to end in late September 2017. Bangunan hotel 7 lantai dan satu level basement dengan luas bangunan sekitar 19.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai September 2016 dan selesai September 2017. Hotel Operator Archipelago International d/h Aston International Indonesia Contact Mr William Cornellius (Head of Project Department - Design Coordinator) 62 21 831 8800 f 62 21 831 7180 Email:
[email protected] Website: www.archipelagointernational.com Wisma Staco, 3rd Floor Suite 100, Jalan Casablanca Kavling 18, Jakarta Selatan, 12870, Jakarta, Indonesia Architect Farchitect PT Contact Mr Fardian Susanto (Director / Architect) 62 22 7070 0366 f 62 22 7070 0366 Email:
[email protected] Website: www.farchitect.com Jalan Dharma Sakti No. 47, Kompleks Singgasana Pradana, Bandung, 40236, West Java, Indonesia Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
16
Sample Project of The Month PROJECT CATEGORY
Residential/ Hotel/ Recreation/ Car Park PROJECT STAGE
Design
CITI ALIT VILLA RESIDENCE - RETIREMENT APARTMENT (continued...)
PROJECT CODE
138872002
CITI ALIT VILLA RESIDENCE - RETIREMENT APARTMENT Jalan Raya Goa Gong, Mangupura, Bali ● ● ● ● ● ● ●
Architect Johannes_Architects Contact Mr Dipl. Ing. Johanes A Kurnia (Director) 62 21 5890 3517 / f 62 21 5890 3517 / 587 9826 5429 2482 Email:
[email protected] Website: www.johanesarchitects.com Jalan Rubi Garden I/16 (Permata Mediterania), Pos pengumben, Srengseng, Kembangan, Jakarta Barat, 12250, Jakarta, Indonesia
4 storey retirement apartment building (approx 9,000 sq m) Up to 99 apartment units Studio type apartment units, 2 bedroom units Car park Apartment lobby & reception lounge Retail shops & restaurants Swimming pool
Contact Mr Agung R (Senior Architect) 62 21 5890 3517 / f 62 21 5890 3517 / 587 9826 5429 2482 Email:
[email protected] Website: www.johanesarchitects.com Jalan Rubi Garden I/16 (Permata Mediterania), Pos pengumben, Srengseng, Kembangan, Jakarta Barat, 12250, Jakarta, Indonesia
Building elements include: ● Flooring : homogeneous tile / wood flooring ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : light brick walls ● Roofing : concrete roof tile / concrete slab roof ● Roof truss : lightweight steel ● Aluminium framed doors & windows / fabricated wood doors ● Lifts ● Split type air conditioning ● Fire protection system ● Security system ● Sanitary ware / plumbing ● Building automation system
Structural Engineer To be appointed Mechanical & Electrical Engineer To be appointed Contractor To be appointed
Estimated cost: undisclosed. Construction is expected to start in early March 2017. Construction is expected to end in late March 2018. Apartemen 4 lantai, dengan luas bangunan sekitar 9.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Maret 2017 dan selesai Maret 2018. Master Planner Johannes_Architects Contact Mr Dipl. Ing. Johanes A Kurnia (Director) 62 21 5890 3517 / f 62 21 5890 3517 / 587 9826 5429 2482 Email:
[email protected] Website: www.johanesarchitects.com Jalan Rubi Garden I/16 (Permata Mediterania), Pos pengumben, Srengseng, Kembangan, Jakarta Barat, 12250, Jakarta, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
17
Sample Project of The Month PROJECT CATEGORY
Residential/ Hotel PROJECT STAGE
CITI ALIT VILLA RESIDENCE - VILLAS (continued...)
PROJECT CODE
Design
138870002
CITI ALIT VILLA RESIDENCE - VILLAS Jalan Raya Goa Gong, Mangupura, Bali ● ● ● ●
Contact Mr Agung R (Senior Architect) 62 21 5890 3517 / f 62 21 5890 3517 / 587 9826 5429 2482 Email:
[email protected] Website: www.johanesarchitects.com Jalan Rubi Garden I/16 (Permata Mediterania), Pos pengumben, Srengseng, Kembangan, Jakarta Barat, 12250, Jakarta, Indonesia
100 x 2 storey villas (type of house : 120 sq m) Units to have 3 bedrooms Internal road network Gated entrance
Building elements include: ● Flooring : homogeneous tile / wood flooring ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : light brick walls ● Roofing : concrete roof tile / concrete slab roof ● Roof truss : lightweight steel ● Aluminium framed doors & windows / fabricated wood doors ● Split type air conditioning
Interior Designer To be appointed Mechanical & Electrical Engineer To be appointed Contractor To be appointed
Estimated cost: undisclosed. Construction is expected to start in early March 2017. Construction is expected to end in late March 2018. Kawasan villa meliputi 100 unit villa 2 lantai, dengan tipe luas bangunan sekitar 120 meter persegi. Perkiraan biaya : tidak dinyatakan. Konstruksi diharapkan mulai Maret 2017 dan selesai Maret 2018. Master Planner Johannes_Architects Contact Mr Dipl. Ing. Johanes A Kurnia (Director) 62 21 5890 3517 / f 62 21 5890 3517 / 587 9826 5429 2482 Email:
[email protected] Website: www.johanesarchitects.com Jalan Rubi Garden I/16 (Permata Mediterania), Pos pengumben, Srengseng, Kembangan, Jakarta Barat, 12250, Jakarta, Indonesia Architect Johannes_Architects Contact Mr Dipl. Ing. Johanes A Kurnia (Director) 62 21 5890 3517 / f 62 21 5890 3517 / 587 9826 5429 2482 Email:
[email protected] Website: www.johanesarchitects.com Jalan Rubi Garden I/16 (Permata Mediterania), Pos pengumben, Srengseng, Kembangan, Jakarta Barat, 12250, Jakarta, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
18
Sample Project of The Month PROJECT CATEGORY
Residential/ Recreation/ Car Park PROJECT STAGE
Design
THE GREEN KOSAMBI (continued...)
PROJECT CODE
122502002
THE GREEN KOSAMBI Jalan Jendral Ahmad Yani No. 136, Bandung, West Java ● ● ● ● ●
Environmental Impact Assessment Teisar Cipta Sarana PT / Denisa Purnama CV Contact Mr Ahmad Dani (Director & Team Leader) 62 22 540 5602 / 543 f 62 22 540 5602 3946 / 541 6631 Email:
[email protected] Website: www.teisarciptasarana.hostoi.com Jalan Manglid No. 25, Kopo Sayati, Bandung, 40226, West Java, Indonesia
15 storey apartment tower on top of 5 storey shopping centre (approx 25,000 sq m) 259 apartment units Studio type apartment units, studio + units, 2 bedroom units, 3 bedroom units 3 basement levels car park Swimming pool
Contact Ms Yunita Pusparini (Ririn) (Project Division Staff) 62 22 540 5602 / 543 f 62 22 540 5602 3946 / 541 6631 Email:
[email protected] Website: www.teisarciptasarana.hostoi.com Jalan Manglid No. 25, Kopo Sayati, Bandung, 40226, West Java, Indonesia
Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : precast concrete panel / gypsum board / light brick walls ● Facade : glass wall cladding / decorative cladding ● Aluminium framed doors & windows / automatic sliding doors / fabricated doors ● 6 lifts ● Split type air conditioning / duct connected air conditioning ● Pilling : bored pile ● Sanitary ware / plumbing ● Fire protection system ● Building automation system
Architect Looksmart Design & Build Contact Mr Rendi Kurniawan (Principal Architect & Project Manager) 62 22 203 8924 f Not available Email:
[email protected] Website: www.looksmart.co.id Jalan Cisatu No. 21, Ciumbuleuit, Bandung, 40142, West Java, Indonesia Structural Engineer To be appointed
Estimated cost: Rp125.00 bn (US$8.86 mn).
Mechanical & Electrical Engineer To be appointed
Construction is expected to start in early August 2016. Construction is expected to end in late January 2018.
Piling Contractor To be appointed
Bangunan apartemen 15 lantai dan 3 level basement, dengan luas bangunan sekitar 25.000 meter persegi. Perkiraan biaya: Rp 125 milyar. Konstruksi diharapkan mulai Agustus 2016 dan diharapkan selesai Januari 2018.
Contractor To be appointed
Developer Maju Makmur Usaha Bersama PT Contact Mr Francis Dima (Director) 62 22 731 4307 f 62 22 731 4307 Email:
[email protected] Jalan Jendral Ahmad Yani No. 136, Bandung, 40262, West Java, Indonesia Contact Mr Timothy Hutama (Marketing Manager) 62 22 731 4307 f 62 22 731 4307 Email:
[email protected] Jalan Jendral Ahmad Yani No. 136, Bandung, 40262, West Java, Indonesia Contact Ms Nancy (Project Division Staff) 62 22 731 4307 f 62 22 731 4307 Email:
[email protected] Jalan Jendral Ahmad Yani No. 136, Bandung, 40262, West Java, Indonesia Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
19
Sample Project of The Month PROJECT CATEGORY
Hotel/ Retail/ Recreation/ Car Park PROJECT STAGE
PROJECT CODE
Documentation
96018002
ASTON HOTEL KARAWANG (4 STARS) (continued...)
ASTON HOTEL KARAWANG (4 STARS) Kawasan Industri KIIC, Karawang, West Java ● ● ● ● ● ● ●
Contact Mr J. Anto (Team Leader & Project Coordinator) 62 22 421 3678 f 62 22 421 3677 Email:
[email protected] Website: www.karyamandiri.co.id Komplek Ruko ITC Kosambi Blok G, No. 6, Jalan Baranangsiang, Bandung, 40112, West Java, Indonesia
9 storey hotel tower (approx 15,560 sq m) 154 hotel rooms Single basement level car park Hotel lobby & reception Dining & restaurant Banquet & function hall Swimming pool
Contact Ms Santi Trilina (Project Division Staff) 62 22 421 3678 f 62 22 421 3677 Email:
[email protected] Website: www.karyamandiri.co.id Komplek Ruko ITC Kosambi Blok G, No. 6, Jalan Baranangsiang, Bandung, 40112, West Java, Indonesia
Building elements include: ● Flooring : ceramic tile / homogeneous tile / hardened floor ● Structural : reinforced concrete ● Ceiling : gypsum board / decorative ceiling ● Walling : light brick walls / precast concrete panel ● Facade : glass wall cladding / decorative cladding ● Roofing : concrete slab roof ● Aluminium framed doors & windows / solid wood doors ● Piling : bored pile / precast pile ● Lifts ● Duct connected air conditioning ● Sanitary ware / plumbing ● Building automation system
Architect Tetra Desain Indonesia PT Contact Mr Andri Rusli (Planning Manager) 62 21 351 8910 f 62 21 351 8935 Email:
[email protected] Website: www.tetra.co.id Jalan Tanah Abang IV No. 1, Jakarta Pusat, 10160, Jakarta, Indonesia Contact Ms Mella Angelia (Architect) 62 21 351 8910 f 62 21 351 8935 Email:
[email protected] Website: www.tetra.co.id Jalan Tanah Abang IV No. 1, Jakarta Pusat, 10160, Jakarta, Indonesia
Estimated cost: Rp124.48 bn (US$8.83 mn). Construction is expected to start in early June 2016. Construction is expected to end in late July 2017.
Contact Mr Dwi Utomo (Architect) 62 21 351 8910 f 62 21 351 8935 Email:
[email protected] Website: www.tetra.co.id Jalan Tanah Abang IV No. 1, Jakarta Pusat, 10160, Jakarta, Indonesia
Hotel 9 lantai dan satu level basement, dengan luas bangunan sekitar 15.560 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Juni 2016 dan selesai Juli 2017. Hotel Operator Archipelago International d/h Aston International Indonesia Contact Mr William Cornellius (Head of Project Department - Design Coordinator) 62 21 831 8800 f 62 21 831 7180 Email:
[email protected] Website: www.archipelagointernational.com Wisma Staco, 3rd Floor Suite 100, Jalan Casablanca Kavling 18, Jakarta Selatan, 12870, Jakarta, Indonesia
Interior Designer To be appointed Structural Engineer Rayakonsult PT - Directorate 3 Contact Mr Oentojo Ciptobusono (Structural Engineer) 62 22 201 5181 f 62 22 201 5181 Email:
[email protected] Website: www.direga-rayakonsult.com Jalan Babakan Jeruk III B No. 2, Bandung, 40163, West Java, Indonesia
Environmental Impact Assessment Karya Mandiri Environment PT Contact Mr Dadan Sudana Wijaya (Director) 62 22 421 3678 f 62 22 421 3677 Email:
[email protected] Website: www.karyamandiri.co.id Komplek Ruko ITC Kosambi Blok G, No. 6, Jalan Baranangsiang, Bandung, 40112, West Java, Indonesia
Mechanical & Electrical Engineer Meraya PT Contact Mr Herdiayana (Director / Project Coordinator) 62 21 7345 4457 f 62 21 7345 4457 Email:
[email protected] Jalan Buana Perkasa IV Blok C6 /18, Komplek Buana Gardenia, Tangerang, 15343, Banten, Indonesia Quantity Surveyor To be appointed Lowest bidders are:
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
20
Sample Project of The Month PROJECT CATEGORY
Residential/ Retail/ Recreation/ Car Park ASTON HOTEL KARAWANG (4 STARS) (continued...)
Total Citra Indonesia PT Contact Mr Andy Siahaan (Director) 62 21 5694 4259 / 565 f 62 21 5694 4259 5980 / 565 5981 Email:
[email protected] Website: totalcitraindonesia.com Jalan Greenville Raya Blok A No. 10 - 12, Duri Kelapa, Kebon Jeruk, Jakarta Barat, 11510, Jakarta, Indonesia
PROJECT STAGE
PROJECT CODE
Documentation
101381002
BEVERLY HILLS APARTMENT - TOWER A Jalan Dr. Wahidin Sudirohusodo, Semarang, Central Java ● ● ● ● ● ●
Piling Contractor To be appointed Contractor To be appointed
12 storey apartment building (approx 16,100 sq m) Up to 200 apartment units Swimming pool At grade car park Apartment lobby & reception area Ground floor retail shops & restaurants
Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board / acoustical ceiling ● Walling : light brick walls / precast concrete panel ● Facade : glass wall cladding / aluminium composite cladding ● Roofing : concrete slab roof ● Aluminium framed doors & windows / fabricated wood doors ● Lifts ● Duct connected air conditioning / split type air conditioning ● Fire protection system ● Security system ● Sanitary ware ● Building automation system Estimated cost: undisclosed. Construction is expected to start in early December 2017. Construction is expected to end in late December 2018. Apartemen 12 lantai, dengan luas bangunan sekitar 16.100 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Desember 2017 dan selesai Desember 2018. Developer Hotel Danau Sunter (Sunlake Hotel) Contact Mrs Maya Lelani (General Manager) 62 21 650 9969 f 62 21 650 9970 Email:
[email protected] Website: www.sunlakehotel.com Jalan Danau Permai Raya Blok C1 Sunter, Jakarta Utara, 14350, Jakarta, Indonesia Contact Mr Maryadi (Engineer) 62 21 650 9969 f 62 21 650 9970 Email:
[email protected] Website: www.sunlakehotel.com Jalan Danau Permai Raya Blok C1 Sunter, Jakarta Utara, 14350, Jakarta, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
21
Sample Project of The Month PROJECT CATEGORY
Hotel/ Retail/ Car Park BEVERLY HILLS APARTMENT - TOWER A (continued...)
PROJECT STAGE
PROJECT CODE
Documentation
85934002
FAVE HOTEL MEDAN (2 STARS) Jalan Letjen S Parman, Medan, North Sumatera
Architect Lawang Arsitek Contact Mr Patricius Marvin Dalimartha (Principal Architect) Not available f Not available Email:
[email protected] Website: www.studiolawang.com Menteng, Jakarta Pusat, 10310, Jakarta, Indonesia (For enquiry, please contact by Email)
● ● ● ● ● ●
Structural Engineer Grand Optima Design PT Contact Mr Hendro Mudjono (Director) 62 878 8613 8320 f Not available Email:
[email protected] Website: www.konsultanstruktur.com Green Garden Blok N2 No.15, Jakarta Barat, 11520, Jakarta, Indonesia
10 storey hotel tower (approx 12,600 sq m) 220 hotel rooms Single basement level car park Hotel lobby & reception lounge Dining & restaurant Banquet & function hall
Building elements include: ● Flooring : ceramic tile / homogeneous tile / carpet ● Structural : reinforced concrete ● Ceiling : gypsum board / decorative ceiling ● Walling : light brick walls ● Facade : glass wall cladding / aluminium composite cladding ● Roofing : concrete slab roof ● Aluminium framed doors & windows / fabricated wood doors / automatic sliding doors ● Piling : precast pile ● 2 lifts ● Split type air conditioning ● Sanitary ware / plumbing ● Building automation system
Mechanical & Electrical Engineer Arnan Pratama Consultants PT Contact Mr Herry Zebua (Design Engineer) 62 21 581 7202 f 62 21 582 6041 Email:
[email protected] Website: www.arnanpc.com Ruko Sentra Niaga Puri Indah Blok T 4 No. 9, Kembangan Selatan, Jakarta Barat, 11610, Jakarta, Indonesia Quantity Surveyor To be appointed
Estimated cost: Rp75.60 bn (US$5.36 mn).
Piling Contractor To be appointed
Construction is expected to start in early February 2016. Construction is expected to end in late January 2017.
Contractor To be appointed
Hotel 10 lantai dan satu level basement, dengan luas bangunan sekitar 12.600 meter persegi. Perkiraan biaya: Rp 75,6 milyar. Konstruksi diharapkan mulai Februari 2016 dan selesai Januari 2017. Hotel Operator Archipelago International d/h Aston International Indonesia Contact Ms Zita Hana Mariska (Business Development Manager) 62 21 831 8800 f 62 21 831 7180 Email:
[email protected] Website: www.archipelagointernational.com Wisma Staco, 3rd Floor Suite 100, Jalan Casablanca Kavling 18, Jakarta Selatan, 12870, Jakarta, Indonesia Architect MAT Architect Team Contact Mr Tony Kho (Director - Architect) 62 852 6128 8818 f Not available Email:
[email protected] Website: www.medanarchitect.com Jalan Karakatau Gang VIII No. 88B, Medan Timur, Medan, 20238, North Sumatera, Indonesia Interior Designer To be appointed
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
22
Sample Project of The Month PROJECT CATEGORY
Residential/ Car Park/ Retail/ Recreation FAVE HOTEL MEDAN (2 STARS) (continued...)
Structural Engineer Maxim Gritama PT Contact Mr Muhammad Nuh (Structural Engineer) 62 61 457 0516 / 452 f 62 61 452 5574 2532 Email:
[email protected] Jalan Majapahit Dalam No. 14 / 12A, Medan, 20112, North Sumatera, Indonesia
PROJECT STAGE
PROJECT CODE
Documentation
135721002
KOLEZA 9 - WHARTON TOWER Jalan Kapten B Sihombing, Medan Estate, Medan, North Sumatera ● ● ●
Mechanical & Electrical Engineer Maxim Gritama PT Contact Mr Ong Gim Seng (Project Coordinator - Engineer) 62 61 457 0516 / 452 f 62 61 452 5574 2532 Email:
[email protected] Jalan Majapahit Dalam No. 14 / 12A, Medan, 20112, North Sumatera, Indonesia
● ● ● ● ● ●
Piling Contractor Geoteknik Lestari Utama PT Contact Mr Andi (Project Coordinator) 62 61 457 0516 / 452 f 62 61 452 5574 2532 Email:
[email protected] Jalan Majapahit Dalam No. 14 / 12A, Medan, 20112, North Sumatera, Indonesia
23 storey apartment tower on top of 2 storey retail podium (approx 19,200 sq m) 481 apartment units Studio type apartment units, 1 bedroom units, 2 bedroom units Single basement level car park Apartment lobby & reception lounge Podium swimming pool Community garden Children playground City walk, café, alfresco dining
Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : light brick walls / precast concrete panels ● Roofing : concrete slab roof ● Facade : glass wall cladding / aluminium composite cladding ● Aluminium framed doors & windows / solid wood doors ● Piling : precast pile ● 3 lifts ● Split type air conditioning / duct connected air conditioning ● Sanitary ware / plumbing ● Fire protection system ● Security system ● Building automation system
Contractor To be appointed
Estimated cost: Rp115.20 bn (US$8.17 mn). Construction is expected to start in early March 2016. Construction is expected to end in late December 2017. Pembangunan apartemen 23 lantai dan satu level basement, dengan luas bangunan sekitar 19.200 meter persegi. Perkiraan biaya: Rp 115,2 milyar. Konstruksi diharapkan mulai Maret 2016 dan selesai Desember 2017. Developer Graha Kencana Abadi PT (Wilmar Group) Contact Mr Martua Sitorus (Director) 62 21 2188 9999 ext f Not available 1230 Website: www.koleza9.com GAMA Tower 47th Floor, Jalan Rasuna Said Kavling C 22, Kuningan, Jakarta Selatan, 12970, Jakarta, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
23
Sample Project of The Month KOLEZA 9 - WHARTON TOWER (continued...)
KOLEZA 9 - WHARTON TOWER (continued...)
Graha Kencana Abadi PT (Wilmar Group) - Medan Contact Mr Sihol Panjaitan (Engineer - Technical Division) 62 61 8001 1112 / f 62 61 80011 100 / 415 4102 7777 / 4102 4203 4891 Email:
[email protected] Website: www.koleza9.com B&G Tower, Lantai 15, Jalan Putri Hijau No. 10, Kesawan , Medan Kota, Medan, 20111, North Sumatera, Indonesia
Piling Contractor Remarks: Joint operation Pilaren PT (Pilaren Property) Contact Mr M Saimin (Project Manager) 62 61 846 1909 / 844 f 62 61 844 4132 3535 Email:
[email protected] Website: www.pilaren.com Jalan Asrama No. 26 A, Pondok Kelapa, Sei Sikambing C2, Medan Helvetia, Medan, 20217, North Sumatera, Indonesia
Architect Megatika International PT - Pos Pengumben Office Contact Mr Henry Pang (Project Director) 62 21 5365 1221 f 62 21 5365 0880 Email:
[email protected] Website: www.megatika.com Komplek Apartemen Permata Eksekutif, Gedung Kantor Lantai 3, Jalan Pos Pengumben, Jakarta Barat, 11550, Jakarta, Indonesia
Geoteknik Lestari Utama PT Contact Mr Ong Gim Seng (Project Manager - Structural Engineer) 62 61 457 0516 / 452 f 62 61 452 5574 2532 Email:
[email protected] Jalan Majapahit Dalam No. 14 / 12A, Medan, 20112, North Sumatera, Indonesia
Contact Mr Chandranikko Darnaedi (Architect) 62 21 5365 1221 f 62 21 5365 0880 Email:
[email protected] Website: www.megatika.com Komplek Apartemen Permata Eksekutif, Gedung Kantor Lantai 3, Jalan Pos Pengumben, Jakarta Barat, 11550, Jakarta, Indonesia
Contractor To be appointed
Structural Engineer Sinergi Pandu Dinamika PT Contact Mr Edi Prayitno (Director) 62 21 797 5339 f 62 21 797 5339 Email:
[email protected] Wisma Aldiron, Lantai 3 Suite #317, Jalan Jendral Gatot Subroto No. 72, Pancoran, Jakarta Selatan, 12780, Jakarta, Indonesia Mechanical & Electrical Engineer Metakom Pranata PT Contact Mr Eko Prasetyo (Project Coordinator) 62 21 582 3167 / 582 f 62 21 582 3168 6178 Email:
[email protected] Website: www.metakom-pranata.com Puri Kencana Blok K7 No. 2 E - F, Kembangan, Jakarta Barat, 11610, Jakarta, Indonesia Quantity Surveyor Quantity Surveyor Indonesia PT Contact Ms Fatimah (Quantity Surveyor for Architecture) 62 21 744 2495 / 7026 f 62 21 744 2495 4020 / 742 3982 Email:
[email protected] Website: www.qsi.co.id Jalan Gunung Indah 2 No. 8, Cirendeu, Ciputat, Tangerang Selatan, 15416, Banten, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
24
Sample Project of The Month PROJECT CATEGORY
Residential/ Car Park/ Retail/ Recreation PROJECT STAGE
PROJECT CODE
Documentation
116299002
MONACO BAY MANADO RESORT CITY - MONACO SUITE (continued...)
MONACO BAY MANADO RESORT CITY - MONACO SUITE Jalan Piere Tendean, Boulevard, Manado, North Sulawesi
Contact Mr Agus Bianto (Staff of Planning Division) 62 21 5579 0190 / f 62 21 5579 7109 5577 7808 / 5579 0191 Website: www.lippokarawaci.co.id 2112 Boulevard Gajah Mada #01- 01, Lippo Cyber Park, Lippo Karawaci Utara, Kota Tangerang, 15811, Banten, Indonesia
● ● ●
48 storey apartment tower (approx 48,000 sq m) 400 apartment units Studio type apartment units, 2 bedroom units & 3 bedroom units ● Single level basement car park ● Retail shops & restaurants ● Swimming pool
Lippo Karawaci Tbk PT - Manado (Project Monaco Bay) Contact Ms Diana Kawatu (Regional Head Lippo Group Zona Sulawesi) 62 431 844 888 f 62 431 844 888 Website: www.monaco-bay.com Hotel Aryaduta Manado, Jalan Piere Tendean, Manado, 95111, North Sulawesi, Indonesia
Please find more information at www.monaco-bay.com Building elements include: ● Flooring : ceramic tile / homogeneous tile / hardened concrete floor ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : precast concrete panels / light brick walls ● Facade : glass wall cladding ● Roofing : concrete slab roof ● Aluminium framed doors & windows / fabricated wood doors ● Piling : bored pile / precast pile ● Lifts ● Split type air conditioning / duct connected air conditioning ● Sanitary ware / plumbing ● Fire protection system ● Security system ● Building automation system
Contact Ms Vonny Manoi (Marketing Officer) 62 431 844 888 f 62 431 844 888 Email:
[email protected] Website: www.monaco-bay.com Hotel Aryaduta Manado, Jalan Piere Tendean, Manado, 95111, North Sulawesi, Indonesia Contact Ms Deta (Administration Staff) 62 431 844 888 f 62 431 844 888 Website: www.monaco-bay.com Hotel Aryaduta Manado, Jalan Piere Tendean, Manado, 95111, North Sulawesi, Indonesia Infrastructure Consultant Aramsa Infrayasa PT Contact Mr Ferry L Santosa (Project Director) 62 21 532 1706 / 549 f 62 21 532 1706 2767 Email:
[email protected] Website: www.aramsa.co.id Jalan Olahraga I No. 5, Kemanggisan, Jakarta Barat, 11480, Jakarta, Indonesia
Estimated cost: undisclosed. Construction is expected to start in early January 2018. Construction is expected to end in late December 2020. Apartemen 48 lantai dan satu level basement, dengan luas bangunan sekitar 48.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Januari 2018 dan selesai Desember 2020.
Contact Mr Ahmad Chakim (Project Manager / Engineer) 62 21 532 1706 / 549 f 62 21 532 1706 2767 Email:
[email protected] Website: www.aramsa.co.id Jalan Olahraga I No. 5, Kemanggisan, Jakarta Barat, 11480, Jakarta, Indonesia
Developer Lippo Karawaci Tbk PT - Lippo Homes Contact Mr Eko Wahyudi (Design Manager) 62 21 5579 0190 / f 62 21 5579 7109 5577 7808 / 5579 0191 Website: www.lippokarawaci.co.id 2112 Boulevard Gajah Mada #01- 01, Lippo Cyber Park, Lippo Karawaci Utara, Kota Tangerang, 15811, Banten, Indonesia
Local Architect Quadratura Indonesia PT Contact Mrs Doti Windajani (Director - Principal Architect) 62 21 5296 1052 / f 62 21 2902 6824 5296 1053 Email:
[email protected] K Link Office Tower, 11th Floor Suite A, Jalan Jendral Gatot Subroto, Kavling 59, Jakarta Selatan, 12950, Jakarta, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
25
Sample Project of The Month PROJECT CATEGORY
Residential MONACO BAY MANADO RESORT CITY - MONACO SUITE (continued...)
PROJECT STAGE
PROJECT CODE
Documentation
139280002
MUKTI SENDANGADI RESIDENCE Jalan Sendangadi 2, Mlati, Sleman, DI Yogyakarta
Contact Mr Riski Renando (Assosiate / Project Architect) 62 21 5296 1052 / f 62 21 2902 6824 5296 1053 Email:
[email protected] K Link Office Tower, 11th Floor Suite A, Jalan Jendral Gatot Subroto, Kavling 59, Jakarta Selatan, 12950, Jakarta, Indonesia
●
39 x 2 storey residential houses (2 types of houses : 102 sq m & 125 sq m) ● Units to have 3 & 4 bedrooms ● Internal road network ● Gated entrance Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : brick walls ● Roofing : concrete roof tile ● Roof truss : lightweight steel ● Aluminium framed doors & windows / solid wood doors ● Sanitary ware
Foreign Architect DP Architects Pte Ltd Contact Mr Wu Tzu Chiang (Project Director - Principal Architect) 65 6338 3988 f 65 6337 9989 Email:
[email protected] Website: www.dpa.com.sg 6 Raffles Boulevard #04-100 Marina Square, Singapore 039594 Structural Engineer Ketira Engineering Consultants PT Contact Mr Paul Retika (Director) 62 21 380 0052 f 62 21 344 6386 Email:
[email protected] Website: www.ketira.com Jalan Tanah Abang V No. 55 - 56 A, Jakarta Pusat, 10160, Jakarta, Indonesia
Estimated cost: undisclosed. Construction is expected to start in early November 2015. Construction is expected to end in late June 2016. Kawasan perumahan meliputi 39 unit rumah 2 lantai, dengan 2 tipe luas bangunan sekitar 102 dan 125 meter persegi. Perkiraan biaya : tidak dinyatakan. Konstruksi diharapkan mulai November 2015 dan selesai Juni 2016.
Mechanical & Electrical Engineer Meltech Consultindo Nusa PT - Bekasi Office Contact Mr M. Hasan (Mechanical Engineer) 62 21 862 3398 f Not available Email:
[email protected] Website: www.meltech-cn.com Bumi Malaka Asri, Jalan Melati IX No 6, Buaran, Bekasi, 17124, West Java, Indonesia
Developer Mugi Mukti Mulia PT Contact Mr Sigit Subagio (Director) 62 274 433 2857 f Not available Email:
[email protected] Website: www.mugimuktimulia.com Gedung Mugi Mukti Mulia Ringin Sari, (Selatan Ditlantas Polda DIY), Maguwoharjo, Sleman, 55711, DI Yogyakarta, Indonesia
Contact Ms Nia Kurniawati (Electrical Engineer) 62 21 862 3398 f Not available Email:
[email protected] Website: www.meltech-cn.com Bumi Malaka Asri, Jalan Melati IX No 6, Buaran, Bekasi, 17124, West Java, Indonesia
Contact Mr Nanang Herna Wiyanto (Project Manager) 62 274 433 2857 f Not available Email:
[email protected] Website: www.mugimuktimulia.com Gedung Mugi Mukti Mulia Ringin Sari, (Selatan Ditlantas Polda DIY), Maguwoharjo, Sleman, 55711, DI Yogyakarta, Indonesia
Piling Contractor To be appointed Contractor To be appointed
Architect Mugi Mukti Mulia PT Contact Mr Arif (Architect & Site Manager) 62 274 433 2857 f Not available Email:
[email protected] Website: www.mugimuktimulia.com Gedung Mugi Mukti Mulia Ringin Sari, (Selatan Ditlantas Polda DIY), Maguwoharjo, Sleman, 55711, DI Yogyakarta, Indonesia Contractor To be appointed Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
26
Sample Project of The Month PROJECT CATEGORY
Hotel/ Recreation/ Retail PROJECT STAGE
PROJECT CODE
Documentation
139278002
NEW WORLD GRAND BALI RESORT (5 STARS) GRAND SUITES (continued...)
NEW WORLD GRAND BALI RESORT (5 STARS) GRAND SUITES Kawasan Pecatu Graha Indah, Badung, Bali ● ● ● ● ● ●
Hotel Operator Rosewood Hotel Group Contact Mr Kip Townsend (Vice President Design and Project Services) 852 2138 2222 f 852 2138 2233 Email:
[email protected] Website: www.rosewoodhotelgroup.com 36/F, New World Tower 1, 18 Queen’s Road Central, Central, Hong Kong 999077, Hong Kong SAR
Single storey hotel building (approx 9,072 sq m) 108 hotel rooms Hotel lobby & reception lounge Dining & restaurant Fitness centre , spa Swimming pool
Architect OLSA Design International PT - Jakarta Contact Mr Syarief Santoso (Director / Principal Architect) 62 21 769 3343 f 62 21 769 3343 Email:
[email protected] Website: www.olsadesign.com Komplex Golden Plaza Blok B - 42, Dbest Fatmawati, Jalan Rumah Sakit Fatmawati No. 15, Jakarta Selatan, 12420, Jakarta, Indonesia
Building elements include: ● Flooring : homogeneous tile / wood flooring / marble ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : light brick walls ● Facade : decorative cladding ● Roofing : concrete slab roof / roof garden ● Aluminium framed doors & windows / solid wood doors ● Lifts ● Split type air conditioning / duct connected air conditioning ● Fire protection system ● Security system ● Sanitary ware / plumbing ● Building automation system
Contact Mr Wisnu (Architect) 62 21 769 3343 f 62 21 769 3343 Email:
[email protected] Website: www.olsadesign.com Komplex Golden Plaza Blok B - 42, Dbest Fatmawati, Jalan Rumah Sakit Fatmawati No. 15, Jakarta Selatan, 12420, Jakarta, Indonesia Foreign Architect WOW Architects Pte Ltd (Warner Wong Design) Contact Mr Wong Chiu Man (Managing Director) 65 6333 3312 f 65 6333 3350 Email:
[email protected] Website: www.wow.sg 30 Hill Street #01-04, Singapore 179360
Estimated cost: undisclosed. Construction is expected to start in early January 2016. Construction is expected to end in late December 2017. Bangunan hotel satu lantai, dengan luas bangunan sekitar 9.072 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Januari 2016 dan selesai Desember 2017.
Interior Designer Hirsch Bedner Associates Pte Ltd Contact Mr H Bedner (Director) 65 6337 2511 f 65 6337 2460 Email:
[email protected] Website: www.hba.com 46 Kim Yam Road The Herencia, #01-10, Singapore 239351
Developer Maxima Realty Group - Mugie Bali Indah PT Contact Mr Djoni Hasjim (President Director) 62 21 7278 1886 / f 62 21 7278 1869 2952 9286 Email:
[email protected] Panin Tower 21st Floor, Senayan City, Jalan Asia Afrika Lot 19, Jakarta Pusat, 10270, Jakarta, Indonesia
Landscape Designer Belt Collins International (Singapore) Pte. Ltd Contact Mr Allen Kerton BA Dip (Managing Director) 65 6223 8133 f 65 6222 9602 Email:
[email protected] Website: www.beltcollins.com No. 4 & 6 Ann Siang Hill, Singapore, Singapore 069791
Contact Mrs Lisa (Staff of Purchasing Division) 62 21 7278 1886 / f 62 21 7278 1869 2952 9286 Email:
[email protected] Panin Tower 21st Floor, Senayan City, Jalan Asia Afrika Lot 19, Jakarta Pusat, 10270, Jakarta, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
27