CONSTRUCTION BULLETIN Sample Project of The Month
About The Publication The BCI Asia Construction Bulletin - INDONESIA R071207 is published by: BCI Asia Construction Information Pte Ltd 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email
[email protected]
Website www.bciasia.com
Other offices: 6221 5790 2930 6231 8293056 844 537 8548 662 651 8600 848 997 4220 852 2538 0011 603 7661 1380 632 884 1122 612 9432 4100
Jakarta Surabaya Bangkok Hanoi Ho Chi Minh City Hong Kong Kuala Lumpur Manila Sydney
f f f f f f f f f
6221 5790 2933/34 6231 8293057 844 537 8549 662 651 8606
848 997 4150 852 2875 0511 603 7661 1381 632 884 1121 612 9432 4111
E-mail:
[email protected] E-mail:
[email protected] E-mail:
[email protected] E-mail:
[email protected] E-mail:
[email protected] E-mail:
[email protected] E-mail:
[email protected] E-mail:
[email protected] E-mail:
[email protected]
THE PUBLICATION BCI Asia Construction Bulletin reports on building and construction projects in Southeast Asia, Hong Kong, and Macau. Projects are researched locally by highly qualified in-house research staff. Projects are monitored from their inception through various phases of planning, design, tender and contract award through to early construction. PROJECT CATEGORIES Projects are classified into 19 categories for easier reference. Categories are defined as follows: Car Parks Community Education Exhibition Health Hotel Industrial Infrastructure Landscaping Legal Mining Office Oil and Gas Recreation Residential Retail Township Transport Utilities
Major car parks, approximately 50 bays or more. Child care centres, kindergartens, churches, mosques, temples, funeral parlours and cemeteries, libraries, community halls, meeting rooms, fire stations. Universities, colleges, schools, research centres and any buildings that have an educational function. Conference centres and exhibition halls. Hospitals, medical centres, surgeries (doctor/dental), pathology centres. Hotels, serviced apartments, motels, hostels and other forms of tourist accommodation. Factories, plants, workshops, warehouses and any other manufacturing and processing facilities. Roads, bridges, civil works, waterways, marinas, piers pipelines, subdivisions and tunnels. Significant landscaping component. Law courts, police stations and prisons. Mines (e.g. coal, gold, tin, copper) excluding oil and gas. Commercial and public offices. Oil and gas exploration and production. Sporting stadiums, sporting fields with clubrooms, swimming pools, tennis courts, cinemas, theme parks, tourist attractions, clubs, pubs, museums, art galleries and gardens. Apartments, townhomes, retirement homes, residential estates and houses. Shopping centres, supermarkets, shops, restaurants and cafes. Urban development. Control towers, freight/passenger terminal buildings and bus/rail interchanges. Water and sewerage plants, pipelines, telecommunications and power plants.
PROJECT STAGES Projects are listed in order of their stage of development. Stages are defined as follows: Competition Concept Design Documentation Tender Post Tender Construction
Architectural, interior and other construction-related design competitions Concept or schematic design is underway Project plans are being drafted for planning approval Specification and working drawings are being drafted Bids are being called for Main Contractor Tender has closed Main Contractor has commenced work on site. Main Contract Awarded or Subcontract(s) Tender Or Subcontract(s) Awarded
Copyright © 2013 BCI Asia Construction Information Pte Ltd. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form, or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of the publisher. All rights reserved. Printed in Singapore by BCI Asia Construction Information Pte Ltd. MICA (P) No.045/04/2009. Disclaimer: Every effort is made to ensure that information in this publication is accurate. However, no responsibility will be taken for any errors which may inadvertently occur.
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
i
About The Publication HOW TO READ A BCI ASIA CONTRUCTION BULLETIN
A typical page from BCI Asia Construction Bulletin. Illustrating the features and benefits. The simple concise lay out is eas y to read and user friendly.
1. The type of project by major category, e.g. hostel, industrial , retail, office allows the user to identify the projects most relevant to him.
3. The project code- is a unique code for each project allowing the user to track the progress of a project, to add new information overtime and to assign the project to a specific sales representative.
2. The stage of the project gives up-to-date information on how far the project has advanced. 4. The project name and address – allows quick and reliable reference at a glance
5. Details of the projectprovided in English and Indonesian – contain up-to-date and accurate information on the project – thoroughly researched and updated whenever there is a significant changed in the development
6. The construction timetable – allows the user to stage his sales priorities
7. The Developer – often the most critical decision maker when it comes to a construction contact.
8. The key contacts – participants in the decision making process. With this list of verified names, addresses and telephone numbers, the user can save countless hours of searching and can go straight to making contact to win new business 9. The next tender to be awarded, typically the main contractor, who is invited to bid. At the later stage, the appointed contractor is announced as a key contact for interested sub-contractors.
THE BCI ASIA QUALITY PROMISE
Every project presented in BCI Asia Construction Bulletin has been research and personally or orally confirmed by a member of the BCI Asia research staff features at least one key decision maker with full contact details certain jobs or contracts that are yet to be assigned No project is included in BCI Asia Construction Bulletin unless it meets these minimum requirements.
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
ii
Sample Project of The Month PROJECT CATEGORY
Education and Research/ Industrial PROJECT STAGE
Competition
BALAI PENDIDIKAN DAN PELATIHAN ILMU PELAYARAN (BP2IP) SUMATERA BARAT (PHASE 5) (continued...)
PROJECT CODE
144374002
BALAI PENDIDIKAN DAN PELATIHAN ILMU PELAYARAN (BP2IP) SUMATERA BARAT (PHASE 5) Desa Nagari Tapakis, Kecamatan Ulakan, Padang Pariaman, West Sumatera
Adhika Karsa Pratama PT Contact Mr Ir. R. Hananto (Director) 62 21 314 7774 f 62 21 314 1923 Email:
[email protected] Website: adhikakarsapratama.co.id Jalan Cimandiri No. 6, Flat 1, Lantai 3, Cikini, Jakarta Pusat, 10330, Jakarta, Indonesia
●
2 x 3 storey training centre buildings (approx. 12,000 sq m) ● 30 classrooms ● Workshops ● Practical rooms
Asri Desindo Intiwidya PT Contact Mr Wahyu Kristianto (Director - Project Architect) 62 21 765 2061 / 765 f 62 21 765 2065 2064 Email:
[email protected] Website: www.pt-adi.co.id Jalan Ciputat Raya No. 12A, Pondok Pinang, Kebayoran Lama, Jakarta Selatan, 12310, Jakarta, Indonesia
Building elements include: ● Flooring : ceramic tile ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : light brick walls ● Roofing : concrete roof tile ● Roof truss : steel frame ● Aluminium framed doors & windows / solid wood doors
Desigram Reka Matra PT Contact Mr Hardi (Project Coordinator) 62 21 8370 6703 f 62 21 8370 6703 Email:
[email protected] Gedung Gajah Lantai 3A, Jalan Dr Sahardjo, Jakarta Selatan, 12840, Jakarta, Indonesia
Estimated cost: Rp50.46 bn (US$3.65 mn). Construction is expected to start in June 2016. Construction is expected to end in late December 2016.
Mitra Fitrah Alam PT Contact Mr Muhamamd Djabir Hasan (Director) 62 21 8591 7656 f Not available Rukan Business Park Kirana Cawang Blok 33 Lantai 3, Jalan Mayjen D.I. Panjaitan Kavling 48, Jakarta Timur, 13340, Jakarta, Indonesia
Pembangunan 2 gedung balai pelatihan dan pendidikan 3 lantai dengan luas bangunan sekitar 12.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Juni 2016 dan selesai Desember 2016. Government Implementing Agency Kementerian Perhubungan - Badan Pengembangan Sumber Daya Manusia (BPSDM) Perhubungan Contact Mr Wahyu Satrio Utomo, SH, M.Si (Head Officer) 62 21 386 5064 f 62 21 384 7480 Email:
[email protected] Website: www.bpsdm.dephub.go.id Jalan Medan Merdeka Timur No. 5, Jakarta Pusat, 10110, Jakarta, Indonesia
Yodya Karya (Persero) PT Contact Mr Colbert Thomas Pangaribuan (President Director) 62 21 8590 5107 / 819 f 62 21 8591 2134 3951 Email:
[email protected] Website: www.yoka.co.id Gedung STT Sapta Taruna 6th Floor, Jalan D.I. Panjaitan Kavling 12, Cawang, Jakarta Timur, 13340, Jakarta, Indonesia
Contact Mr Drs Ridwan Setiawan M.Si, M.Mar.E (Kepala Pusat Pengembangan Sumber Daya Manusia Perhubungan Laut) 62 21 386 5064 f 62 21 384 7480 Email:
[email protected] Website: www.bpsdm.dephub.go.id Jalan Medan Merdeka Timur No. 5, Jakarta Pusat, 10110, Jakarta, Indonesia
Construction Manager To be appointed Remarks: The tenderers are listed in alphabetical order. Bidders include:
Interior Designer To be appointed Remarks: The tenderers are listed in alphabetical order. Bidders include:
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
1
Sample Project of The Month PROJECT CATEGORY
Education and Research/ Recreation BALAI PENDIDIKAN DAN PELATIHAN ILMU PELAYARAN (BP2IP) SUMATERA BARAT (PHASE 5) (continued...)
PROJECT STAGE
Competition
PROJECT CODE
145057002
JATIDIRI SPORTS CENTRE - SEKOLAH KHUSUS OLAHRAGA Jalan Karangrejo, Kawasan Gelanggang Olahraga Jatidiri, Semarang, Central Java
Arkitek Team Empat PT Contact Mr Zachri Zunaid (Director) 62 21 380 4368 / 380 f 62 21 380 4369 3766 Email:
[email protected] Jalan Tanah Abang V No. 13, Petojo Selatan , Gambir, Jakarta Pusat, 10160, Jakarta, Indonesia
● ● ● ●
Arkonin PT Contact Mr Bambang Tutuko Warsokusumo (Technical Director / Project Coordinator) 62 21 736 4176 f 62 21 736 3829 Email:
[email protected] Website: www.arkonin-id.com Gedung Arkonin, Jalan Bintaro Taman Timur, Bintaro Jaya Sektor I, Jakarta Selatan, 12330, Jakarta, Indonesia
3 storey school building (approx. 4,160 sq m) Classrooms Practical rooms Sports laboratory
Estimated cost: Rp26.00 bn (US$1.88 mn). Construction is expected to start in early June 2016. Construction is expected to end in early December 2016. Gedung sekolah khusus olahraga 3 lantai dengan luas bangunan sekitar 4.160 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Juni 2016 dan selesai Desember 2016.
Artefak Arkindo PT - Construction Manager Contact Mr Agus Sutjatmiko (Project Director) 62 21 530 0137 f 62 21 530 1145 Email:
[email protected] Jalan Anggrek Cendrawasih No. 16 - 17, Jakarta Barat, 11480, Jakarta, Indonesia
Government Implementing Agency Dinas Pemuda dan Olahraga Propinsi Jawa Tengah Contact Mr Drs. Budi Santoso, M.Si (Head Officer - Kuasa Pengguna Anggaran) 62 24 841 9956 f 62 24 841 9959 Website: dinpora.jawatengah.go.id Jalan Ki Mangunsarkoro No.12, Semarang, 50241, Central Java, Indonesia
Ciriajasa Cipta Mandiri PT Contact Mr Aman Santoso (Director) 62 21 726 5320 / 726 f 62 21 725 8483 5322 Email:
[email protected] Website: www.ciriajasa.com Jalan Kerinci IX No. 14, Kebayoran Baru, Jakarta Selatan, 12120, Jakarta, Indonesia
Contact Mr Drs. Henky Sulomo MM (Project Manager Kabid Sarpras dan Kemitraan) 62 24 841 9956 f 62 24 841 9959 Website: dinpora.jawatengah.go.id Jalan Ki Mangunsarkoro No.12, Semarang, 50241, Central Java, Indonesia
Yodya Karya (Persero) PT Contact Mr Colbert Thomas Pangaribuan (President Director) 62 21 8590 5107 / 819 f 62 21 8591 2134 3951 Email:
[email protected] Website: www.yoka.co.id Gedung STT Sapta Taruna 6th Floor, Jalan D.I. Panjaitan Kavling 12, Cawang, Jakarta Timur, 13340, Jakarta, Indonesia
Supervisory Consultant To be appointed Master Planner Widha Consultant PT Contact Mr Nugroho Pudji Rahardjo (Director) 62 24 746 4680 / 7077 f 62 24 746 4683 8492 Email:
[email protected] Graha Widya Dharma Lantai 1, Jalan Prof. H. Sudarto No. 58, Tembalang, Semarang, 50269, Central Java, Indonesia
Tender Office Kementerian Perhubungan - Badan Pengembangan Sumber Daya Manusia (BPSDM) Perhubungan Contact Mr Kurnia Djuprianto (Head of Tender Committee) 62 21 384 7403 / 384 f 62 21 384 7480 7404 Email:
[email protected] Website: www.bpsdm.dephub.go.id Jalan Medan Merdeka Timur No. 5, Jakarta Pusat, 10110, Jakarta, Indonesia
Contact Mr Ronny AB Wardhana (Project Architect) 62 24 746 4680 / 7077 f 62 24 746 4683 8492 Email:
[email protected] Graha Widya Dharma Lantai 1, Jalan Prof. H. Sudarto No. 58, Tembalang, Semarang, 50269, Central Java, Indonesia
Contractor To be appointed
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
2
Sample Project of The Month PROJECT CATEGORY
Education and Research/ Office JATIDIRI SPORTS CENTRE - SEKOLAH KHUSUS OLAHRAGA (continued...)
PROJECT STAGE
Competition
PROJECT CODE
145279002
LABORATORIUM PENGUJIAN PENCEGAHAN DAN PEMBERANTASAN PENYAKIT (P2P) Dusun Karanganyar, Desa Wonosari, Kecamatan Tutur, Nongkojajar, Kabupaten Pasuruan, East Java
Architect To be appointed Remarks: Qualification : Non small scale business. Qualification method : Pre-qualification. The aanwijzing (tender explanation) is scheduled on 28 December 2015.
● ● ●
Tender opens on 23 December, 2015 and closes on 29 December, 2015. Tender Office Dinas Pemuda dan Olahraga Propinsi Jawa Tengah Contact Mr Agus Prasutio, SH (Member of Tender Committee - Pejabat Pelaksana Teknik Kegiatan (PPTK)) 62 24 841 9956 f 62 24 841 9959 Website: dinpora.jawatengah.go.id Jalan Ki Mangunsarkoro No.12, Semarang, 50241, Central Java, Indonesia
3 storey laboratory building (approx. 5,000 sq m) Equipment storage Observation room
Estimated cost: undisclosed. Construction is expected to start in early May 2016. Construction is expected to end in late September 2016. Bangunan laboratorium 3 lantai dengan luas bangunan sekitar 5.000 meter persegi. Perkiraan biaya: tidak dinyatakan . Konstruksi diharapkan mulai Mei 2016 dan selesai September 2016.
Contractor To be appointed
Government Implementing Agency Balai Besar Teknik Kesehatan Lingkungan dan Pengendalian Penyakit Surabaya Contact Mr Zainal Ilyas Nampira, SKM.,M. Kes. (Head Officer) 62 31 354 0189 / 354 f 62 31 352 8847 0191 Email:
[email protected] Website: www.btklsby.go.id Jalan Sidoluhur No. 12 (Indrapura), Surabaya, 60175, East Java, Indonesia Contact Mr Wahyu Hari Himawan (Kasubag Bina Program) 62 31 354 0189 / 354 f 62 31 352 8847 0191 Email:
[email protected] Website: www.btklsby.go.id Jalan Sidoluhur No. 12 (Indrapura), Surabaya, 60175, East Java, Indonesia Supervisory Consultant To be appointed Architect To be appointed Remarks: Qualification : Small scale business. Qualification method : Pre-qualification. The aanwijzing (tender explanation) is scheduled on 29 December 2015. Tender opens on 28 December, 2015 and closes on 04 January, 2016. Tender Office Balai Besar Teknik Kesehatan Lingkungan dan Pengendalian Penyakit Surabaya Contact Mr Ronny Koesnariyanto, ST, M.Kes. (Head of Tender Comittee) 62 31 354 0189 / 354 f 62 31 352 8847 0191 Email:
[email protected] Website: www.btklsby.go.id Jalan Sidoluhur No. 12 (Indrapura), Surabaya, 60175, East Java, Indonesia Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
3
Sample Project of The Month PROJECT CATEGORY
Residential/ Retail/ Recreation LABORATORIUM PENGUJIAN PENCEGAHAN DAN PEMBERANTASAN PENYAKIT (P2P) (continued...)
PROJECT STAGE
Concept
PROJECT CODE
144893002
BANDUNG CENTRAL PARK Site yet to be determined, Bandung, West Java
Contractor To be appointed
●
2 x 27 storey apartment buildings (approx. 50,000 sq m) ● Ground floor retail shops & restaurants ● Children playground ● Apartment lobby & reception lounge Estimated cost: undisclosed. Construction is expected to start in early June 2017. Construction is expected to end in late December 2019. Apartemen 27 lantai dengan luas bangunan sekitar 50.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Juni 2017 dan selesai Desember 2019. Developer Jabar Bumi Konstruksi PT Contact Mr Ir Wibowo (Director) 62 22 250 1426 f 62 22 250 1426 Email:
[email protected] Website: jabarbumikonstruksi.co.id Jalan Sidomulya No. 39, Bandung, 40123, West Java, Indonesia Contact Mr Hidayat Karim (Project Manager) 62 22 250 1426 f 62 22 250 1426 Email:
[email protected] Website: jabarbumikonstruksi.co.id Jalan Sidomulya No. 39, Bandung, 40123, West Java, Indonesia Conceptual Designer Jabar Bumi Konstruksi PT Contact Mr Ir Matheus (Operational Director) 62 22 250 1426 f 62 22 250 1426 Email:
[email protected] Website: jabarbumikonstruksi.co.id Jalan Sidomulya No. 39, Bandung, 40123, West Java, Indonesia Architect To be appointed Structural Engineer To be appointed Mechanical & Electrical Engineer To be appointed Contractor To be appointed
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
4
Sample Project of The Month PROJECT CATEGORY
Residential/ Hotel/ Car Park/ Retail/ Recreation PROJECT STAGE
Concept
CONDOTEL AT JALAN KOMBES POL M. DURYAT (continued...)
PROJECT CODE
145339002
CONDOTEL AT JALAN KOMBES POL M. DURYAT Jalan Kombes Pol M. Duryat, Surabaya, East Java ● ● ● ● ● ● ●
Mechanical & Electrical Engineer To be appointed
20 storey apartment & hotel building (approx. 18,210 sq m) 6 multi storey car park (approx. 4,200 sq m) Up to 350 apartment units & hotel rooms Lobby & reception lounge Ground floor retail shops & restaurants Swimming pool Gymnasium, fitness centre
Quantity Surveyor To be appointed Contractor To be appointed
Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board / acoustical ceiling ● Walling : precast concrete panel ● Facade : glass wall cladding / decorative cladding ● Aluminium framed doors & windows / solid wood doors ● Roofing : concrete slab roof ● Lifts ● Duct connected air conditioning / split type air conditioning ● Fire protection system ● Security system ● Sanitary ware / plumbing ● Building automation system Estimated cost: Rp133.30 bn (US$9.65 mn). Construction is expected to start in early March 2017. Construction is expected to end in early December 2017. Kondotel 20 lantai dan 6 lantai gedung parkir dengan total luas bangunan sekitar 22.410 meter persegi. Perkiraan biaya: tidak dinyatakan. Waktu konstruksi belum ditentukan Hotel Operator To be appointed Architect Piter Gan Architect PT - Jakarta Contact Mr Piter Gan (Director) 62 21 765 1781 f 62 21 765 2875 Email:
[email protected] Website: www.pitergan.com/ Jalan Pangeran Antasari No. 10B, Cipete Selatan, Jakarta Selatan, 12150, Jakarta, Indonesia Contact Mr Raymond Wibisono (Architect) 62 21 765 1781 f 62 21 765 2875 Email:
[email protected] Website: www.pitergan.com/ Jalan Pangeran Antasari No. 10B, Cipete Selatan, Jakarta Selatan, 12150, Jakarta, Indonesia Structural Engineer To be appointed
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
5
Sample Project of The Month PROJECT CATEGORY
PROJECT CATEGORY
Hotel/ Recreation/ Retail
Residential/ Recreation/ Retail/ Car Park
PROJECT STAGE
Concept
PROJECT CODE
PROJECT STAGE
145474002
Concept
FAME HOTEL TEGAL (2 STARS) Site yet to be determined, Tegal, Central Java ● ● ● ● ●
PROJECT CODE
144169002
GREEN OSO CITY - APARTMENTS Jalan Metro Tanjung Bunga, Kecamatan Tamalate, Makassar, South Sulawesi
4 storey hotel building (approx. 4,000 sq m) up to 90 hotel rooms Lobby & reception lounge Dining & restaurant Swimming pool
● ● ● ● ● ● ●
Estimated cost: undisclosed. Construction timetable is to be determined.
35 storey apartment building (approx 35,000 sq m) At grade car park Apartment lobby & reception lounge Ground floor retail shops & restaurants Swimming pool Gymnasium, fitness centre, spa, sauna City walk, café, convenience store, alfresco dining
Estimated cost: undisclosed.
Hotel 4 lantai dengan luas bangunan sekitar 4.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Waktu konstruksi belum ditentukan.
Construction is expected to start in early January 2017. A completion date is to be determined.
Developer Paramount Enterprise International PT Contact Mr Norman Daulay (General Manager) 62 21 5420 0888 / f 62 21 547 4335 5420 0999 Website: www.paramount-land.com Paramount Plaza, Jalan Boulevard Raya Gading Serpong Kavling 1, Gading Serpong, Kabupaten Tangerang, 15810, Banten, Indonesia
Apartemen 35 lantai, dengan luas bangunan sekitar 35.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Januari 2017. Waktu penyelesaian belum ditentukan. Developer Citra Putra Mandiri PT (OSO Group) Contact Ms Myrani Isnaniati (President Director) 62 21 3199 6270 / f 62 21 3199 6268 / 3199 6276 3199 6231 Website: www.cpm.co.id The City Tower 18th floor, Jalan M.H. Thamrin No. 81, Jakarta Pusat, 10350, Jakarta, Indonesia
Contact Mr Mohammad Zazuli (Staff of Planning Division) 62 21 5420 0888 / f 62 21 547 4335 5420 0999 Email:
[email protected] Website: www.paramount-land.com Paramount Plaza, Jalan Boulevard Raya Gading Serpong Kavling 1, Gading Serpong, Kabupaten Tangerang, 15810, Banten, Indonesia
Contact Mr Raja Sapta Ervian (Director) 62 21 3199 6270 / f 62 21 3199 6268 / 3199 6276 3199 6231 Website: www.cpm.co.id The City Tower 18th floor, Jalan M.H. Thamrin No. 81, Jakarta Pusat, 10350, Jakarta, Indonesia
Hotel Operator Parador Hotels and Resorts Contact Ms Pramita Sari Setiawan (Corporate Marketing Communication Manager) 62 21 292 15999 / 291 f 62 21 292 16999 71111 Email:
[email protected] Website: www.parador-hotels.com Atria Residences Building, Lobby Level, CBD Gading Serpong Lot #5,Jalan Boulevard Gading Serpong, Kabupaten Tangerang, 15810, Banten, Indonesia
Contact Ms Nani Nadia (Secretary) 62 21 3199 6270 / f 62 21 3199 6268 / 3199 6276 3199 6231 Website: www.cpm.co.id The City Tower 18th floor, Jalan M.H. Thamrin No. 81, Jakarta Pusat, 10350, Jakarta, Indonesia Architect To be appointed
Architect To be appointed
Structural Engineer To be appointed
Structural Engineer To be appointed
Mechanical & Electrical Engineer To be appointed
Mechanical & Electrical Engineer To be appointed
Quantity Surveyor To be appointed
Contractor To be appointed
Contractor To be appointed
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
6
Sample Project of The Month PROJECT CATEGORY
PROJECT CATEGORY
Hotel/ Retail/ Recreation
Hotel/ Retail/ Recreation/ Car Park
PROJECT STAGE
Concept
PROJECT CODE
PROJECT STAGE
145461002
Concept
HARPER HOTEL SOLO (4 STARS) Site yet to be determined, Surakarta, Central Java ● ● ● ● ● ●
PROJECT CODE
144916002
HOTEL AT JALAN PEMUDA - SURABAYA Jalan Pemuda No. 17, Surabaya, East Java ● ● ● ● ● ● ●
10 storey hotel building (approx. 6,600 sq m) up to 150 hotel rooms Hotel lobby & reception area Dining & restaurant Swimming pool Single basement level car park
19 storey hotel (approx 26,500 sq m) Up to 180 hotel rooms Hotel lobby & reception lounge Dining & restaurant Banquet & function room Swimming pool At grade car park
Estimated cost: undisclosed. Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board / acoustical ceiling ● Walling : light brick walls ● Facade : glass wall cladding / aluminium composite cladding ● Roofing : concrete slab roof ● Aluminium framed doors & windows / fabricated wood doors ● Piling : bored pile / precast pile / tube pile ● Lifts ● Duct connected air conditioning ● Fire protection system ● Security system ● Sanitary ware ● Building automation system
Construction is expected to start in late June 2016. A completion date is to be determined. Bangunan hotel 10 lantai dan satu level basement, dengan luas bangunan sekitar 6.600 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Juni 2016. Waktu penyelesaian belum ditentukan. Hotel Operator Archipelago International (formerly Aston International Indonesia) Contact Ms Nurulita Amalia (Corporate Director of Purchasing) 62 21 831 8800 f 62 21 831 7180 Website: www.archipelagointernational.com Wisma Staco, 3rd Floor Suite 100, Jalan Casablanca Kavling 18, Jakarta Selatan, 12870, Jakarta, Indonesia Contact Mr William Cornellius (Head of Project Department - Design Coordinator) 62 21 831 8800 f 62 21 831 7180 Email:
[email protected] Website: www.archipelagointernational.com Wisma Staco, 3rd Floor Suite 100, Jalan Casablanca Kavling 18, Jakarta Selatan, 12870, Jakarta, Indonesia
Estimated cost: undisclosed. Construction is expected to start in early September 2016. Construction is expected to end in early September 2017.
Architect To be appointed
Bangunan hotel 19 lantai dengan luas bangunan sekitar 26.500 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai September 2016 dan selesai September 2017.
Structural Engineer To be appointed
Hotel Operator To be appointed
Mechanical & Electrical Engineer To be appointed
Architect Piter Gan Architect PT - Jakarta Contact Mr Piter Gan (Director) 62 21 765 1781 f 62 21 765 2875 Email:
[email protected] Website: www.pitergan.com/ Jalan Pangeran Antasari No. 10B, Cipete Selatan, Jakarta Selatan, 12150, Jakarta, Indonesia
Contractor To be appointed
Contact Mr Raymond Wibisono (Architect) 62 21 765 1781 f 62 21 765 2875 Email:
[email protected] Website: www.pitergan.com/ Jalan Pangeran Antasari No. 10B, Cipete Selatan, Jakarta Selatan, 12150, Jakarta, Indonesia Structural Engineer To be appointed Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
7
Sample Project of The Month PROJECT CATEGORY
Education and Research HOTEL AT JALAN PEMUDA - SURABAYA (continued...)
PROJECT STAGE
Concept Mechanical & Electrical Engineer To be appointed
PROJECT CODE
142564002
INSTITUT AGAMA ISLAM NEGERI (IAIN) TULUNGAGUNG - FAKULTAS SYARIAH DAN ILMU HUKUM (FASIH) Jalan Mayor Sujadi Timur No. 46, Tulungagung, East Java
Quantity Surveyor To be appointed Contractor To be appointed
● ● ● ●
4 storey campus building (approx 4,500 sq m) Classrooms Lecturer rooms Administration room
Building elements include: ● Flooring : ceramic tile ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : light brick walls ● Roofing : concrete roof tile ● Roof truss : steel frame ● Aluminium framed doors & windows / fabricated wood doors ● Sanitary ware / plumbing Estimated cost: undisclosed. Construction is expected to start in late August 2016. Construction is expected to end in late December 2016. Gedung kampus 4 lantai terdiri dengan luas bangunan sekitar 4.500 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Agustus 2016 dan selesai Desember 2016. Developer Institut Agama Islam Negeri Tulungagung Contact Mr Saifudin Zuhri (Wakil Rektor Bidang Administrasi Umum, Keuangan & Perencanaan) 62 355 321 513 f 62 355 321 656 Email:
[email protected] Website: www.iain-tulungagung.ac.id Jalan Mayor Sujadi Timur No. 46, Plosokandang, Tulungagung, 66221, East Java, Indonesia Supervisory Consultant To be appointed Architect Alco Art Studio Consultant PT Contact Mr Ir. Gunawan ,MT, IAI (Director - Principal Architect) 62 31 847 0138 / 841 f 62 31 841 0149 0149 Email:
[email protected] Jalan Sidosermo PDK VA Kavling 45, Surabaya, 60239, East Java, Indonesia Contact Mr Ir. Mohamad Sjamsul Arifin (Team Leader) 62 31 847 0138 / 841 f 62 31 841 4549 4549 Email:
[email protected] Jalan Sidosermo PDK VA Kavling 45, Surabaya, 60239, East Java, Indonesia Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
8
Sample Project of The Month PROJECT CATEGORY
Utilities/ Infrastructure INSTITUT AGAMA ISLAM NEGERI (IAIN) TULUNGAGUNG - FAKULTAS SYARIAH DAN ILMU HUKUM (FASIH) (continued...)
PROJECT STAGE
Concept
PROJECT CODE
121308002
JAWA 7 COAL POWER PLANT (2 X 1,000 MW) IPP BANTEN Desa Terate, Kecamatan Kramatwatu, Serang, Banten
Construction Manager Etika Prana PT Contact Mr Chasan Hindaroh (Director - Project Coordinator) 62 31 594 2677 / 594 f 62 31 594 1598 1598 Email:
[email protected] Jalan Mojoklanggru Wetan IV - A No. 20 - 21, Surabaya, 60285, East Java, Indonesia
● ● ● ● ● ● ● ● ● ●
Contact Mr Iqbal Ibnu Rosyid (Team Leader) 62 31 594 2677 / 594 f 62 31 594 1598 1598 Email:
[email protected] Jalan Mojoklanggru Wetan IV - A No. 20 - 21, Surabaya, 60285, East Java, Indonesia
Coal fired steam power plant (capacity of 2 x 1,000 MW) Turbine house Boiler house with steel structure Chimney Electrical system Jetty & trestle Oil tanks Seal pit Coal handling system Cooling water system
Estimated cost: undisclosed.
Contractor To be appointed
Construction is expected to start in early June 2017. Construction is expected to end in early January 2019. Pembangkit listrik tenaga uap batubara dengan kapasitas 2 x 1.000 megawatt. Perkiraan biaya : tidak dinyatakan. Konstruksi diharapkan mulai Juni 2017 dan selesai Januari 2019. Concessionaire Pembangkitan Jawa Bali PT Contact Mr Mulyo Adji (Development & Commercial Director) 62 31 828 3180 - 828 f 62 31 829 1280 3186 Email:
[email protected] Website: www.ptpjb.com Jalan Ketintang Baru No 11, Surabaya, 60231, East Java, Indonesia Regulator Perusahaan Listrik Negara (Persero) PT - Unit Induk Pembangunan VIII Contact Mr Pudjo Santoso (General Manager) 62 31 829 1377 f 62 31 828 8959 / 829 1538 Email:
[email protected] Website: www.pln.co.id/uipkitthermaljb Jalan Ketintang Baru I No. 1-3, Surabaya, 60231, East Java, Indonesia Perusahaan Listrik Negara (Persero) PT Contact Mr Iwan Purwana (Head of Strategic Procurement Division) 62 21 726 1122 / 726 f 62 21 722 7025 / 722 1875 7060 Email:
[email protected] Website: www.pln.co.id Jalan Trunojoyo Blok MI / 135, Main Building 15th floor, Kebayoran Baru, Jakarta Selatan, 12110, Jakarta, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
9
Sample Project of The Month JAWA 7 COAL POWER PLANT (2 X 1,000 MW) IPP BANTEN (continued...)
JAWA 7 COAL POWER PLANT (2 X 1,000 MW) IPP BANTEN (continued...)
Contact Mr Hernadi Buhron (Head of IPP Division) 62 21 726 1122 / 726 f 62 21 722 7025 / 722 1875 7060 Email:
[email protected] Website: www.pln.co.id Jalan Trunojoyo Blok MI / 135, Main Building 15th floor, Kebayoran Baru, Jakarta Selatan, 12110, Jakarta, Indonesia
Intimulya Multikencana PT Contact Mr Ir. H. Suhardi (Direktur Utama) 62 22 780 3787 f 62 22 783 4961 Email:
[email protected] Komplek Ujung Berung Indah Blok 7 No. 7, Bandung, 40613, West Java, Indonesia Royal Haskoning DHV Contact Mr Wybe de Jager (Director) 62 21 750 4605 f 62 21 750 4610 Email:
[email protected] Website: www.royalhaskoningdhv.com Ventura Building 2nd floor, Jalan R.A. Kartini No. 26 (Outer Ring Road) Cilandak, Jakarta Selatan, 12430, Jakarta, Indonesia
Loan Agency To be appointed Investor China Shenhua Energy Co.,Ltd Contact Mr Wang Shumin (Vice President) 86 10 5813 1088 f 86 10 5813 1804 Email:
[email protected] Website: www.csec.com No.22 Xibinhe Road Andingmen, Dongcheng District, Beijing, China
Surveyor Indonesia PT Contact Mr M. Arief Zainuddin (President Director) 62 21 526 5526 / 526 f 62 21 526 5525 3333 / 526 51591 Email:
[email protected] Website: www.ptsi.co.id Graha Surveyor Indonesia, Jalan Jendral Gatot Subroto Kavling 56, Jakarta Selatan, 12950, Jakarta, Indonesia
Environmental Impact Assessment To be appointed Remarks: The tenderers are listed in alphabetical order Bidders include: Adi Banuwa PT - Operational Office Contact Mrs Yuliana Andriani (Director) 62 31 841 2536 / 841 f 62 31 841 2517 2543 Email:
[email protected] Ruko Panji Makmur Blok C No. 11, Jalan Raya Panjang Jiwo, Surabaya, 60400, East Java, Indonesia
Tender Office Perusahaan Listrik Negara (Persero) PT Contact Mr Kuswara Harjowijaya (Secretary of Procurement Committee) 62 21 722 7049 f 62 21 722 7025 / 722 7060 Email:
[email protected] Website: www.pln.co.id Jalan Trunojoyo Blok MI / 135, Main Building 15th floor, Kebayoran Baru, Jakarta Selatan, 12110, Jakarta, Indonesia
Gelar Buana Semesta PT Contact Mr Ardi Efendi Saleh (Director) Not available f Not available Email:
[email protected] Jalan Mentor No. 62, Sukaraja, Bandung, 40172, West Java, Indonesia
EPC Contractor To be appointed
Nusa Buana Cipta PT Contact Mr Dwisatya H (Staff of Marketing Division) 62 21 830 3718 f 62 21 830 3718 Email:
[email protected] Jalan Tebet Utara IB No 3, Tebet, Jakarta Selatan, 12810, Jakarta, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
10
Sample Project of The Month PROJECT CATEGORY
PROJECT CATEGORY
Infrastructure
Education and Research
PROJECT STAGE
Concept
PROJECT CODE
PROJECT STAGE
145664002
Concept
KALI WONOKROMO RIVER NORMALIZATION SURABAYA Kali Wonokromo, Surabaya, East Java ● ● ●
PROJECT CODE
116747002
KOTA BARU PARAHYANGAN (PHASE 2) MARANATHA UNIVERSITY Kota Baru Parahyangan, Bandung, West Java ● ● ● ●
River normalization (approx. 1.5 km length) Dredging work Civil works
4 storey university building (approx 12,000 sq m) Classrooms Lecturer rooms Administration room
Estimated cost: Rp58.96 bn (US$4.27 mn). Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board / acoustical ceiling ● Walling : precast concrete panel ● Roofing : concrete slab roof ● Roof truss : steel frame ● Aluminium framed doors & windows / solid wood doors ● Split type air conditioning ● Sanitary ware / plumbing
Work is expected to start in early April 2016. Work is expected to end in late July 2016. Pekerjaan normalisasi sungai sepanjang 1,5 kilometer, meliputi: pengerukan sungai dan pelebaran sungai. Perkiraan biaya: Rp 58,96 milyar. Pekerjaan diharapkan mulai April 2016 dan selesai Juli 2016. Government Implementing Agency Kementerian Pekerjaan Umum dan Perumahan Rakyat - SNVT Pelaksanaan Jaringan Sumber Air Brantas Contact Mr Ir. Achmad Fauzi, MT (Project Manager) 62 31 752 1645 f 62 31 752 1645 Jalan Menganti No. 312, Wiyung, Surabaya, 60227, East Java, Indonesia
Estimated cost: Rp42.00 bn (US$3.23 mn). Construction is expected to start in early July 2016. Construction is expected to end in late December 2017.
Contact Mr Arianto, ST. MT (Team Leader - PPK. Irigasi Rawa 2) 62 31 752 1645 f 62 31 752 1645 Jalan Menganti No. 312, Wiyung, Surabaya, 60227, East Java, Indonesia
Gedung kampus 4 lantai dengan luas bangunan sekitar 12.000 meter persegi. Perkiraan biaya: Rp 42 milyar. Konstruksi diharapkan mulai Juli 2016 dan selesai Desember 2017. Developer Belaputera Intiland PT Contact Mr Ryan Brasali (General Manager) 62 22 680 3777 / 680 f 62 22 680 7555 8022 Email:
[email protected] Website: www.kotabaruparahyangan.com Jalan Panyawangan, Kavling 66B, No. 6, Bumi Indraprasta, Home and Living Centre, Kota Baru Parahyangan, Bandung Barat, 40553, West Java, Indonesia
Contact Mr Dasniar (Project Coordinator) 62 31 752 1645 f 62 31 752 1645 Jalan Menganti No. 312, Wiyung, Surabaya, 60227, East Java, Indonesia Supervisory Consultant To be appointed Civil Engineer To be appointed Tender Office To be appointed
Contact Mr Sugiharto Subagjo (Project Coordinator / Architect) 62 22 8681 3837 / 680 f 62 22 680 7555 3333 / 680 7888 Email:
[email protected] Website: www.kotabaruparahyangan.com Jalan Panyawangan, Kavling 66B, No. 6, Bumi Indraprasta, Home and Living Centre, Kota Baru Parahyangan, Bandung Barat, 40553, West Java, Indonesia
Contractor To be appointed
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
11
Sample Project of The Month KOTA BARU PARAHYANGAN (PHASE 2) MARANATHA UNIVERSITY (continued...)
KOTA BARU PARAHYANGAN (PHASE 2) MARANATHA UNIVERSITY (continued...)
Yayasan Maranatha Bandung Contact Mr Beng Sugiharto (Ketua Yayasan) 62 22 201 2186 / 200 f 62 22 200 7916 7916 Email:
[email protected] Website: www.maranatha.edu Jalan Prof. drg. Surya Sumantri No. 65, Bandung, 40164, West Java, Indonesia
Contact Mr Mario Andreti (Project Architect & Construction Manager) 62 274 880 637 f 62 274 887 778 Email:
[email protected] Website: www.globalrancangselaras.com Jalan Apel No. 111, Nglaban, Ngaglik, Sleman, 55281, DI Yogyakarta, Indonesia
Belaputera Intiland PT Contact Mr Viki Auliya (Architect) 62 22 8681 3837 / 680 f 62 22 680 7555 3333 / 680 7888 Email:
[email protected] Website: www.kotabaruparahyangan.com Jalan Panyawangan, Kavling 66B, No. 6, Bumi Indraprasta, Home and Living Centre, Kota Baru Parahyangan, Bandung Barat, 40553, West Java, Indonesia
Contact Mrs Dian (Staff Officer) 62 274 880 637 f 62 274 887 778 Email:
[email protected] Website: www.globalrancangselaras.com Jalan Apel No. 111, Nglaban, Ngaglik, Sleman, 55281, DI Yogyakarta, Indonesia Structural Engineer To be appointed Mechanical & Electrical Engineer To be appointed
Yayasan Maranatha Bandung Contact Ms Cindy (Administrator / General Staff) 62 22 201 2186 / 200 f 62 22 200 7916 7916 Email:
[email protected] Website: www.maranatha.edu Jalan Prof. drg. Surya Sumantri No. 65, Bandung, 40164, West Java, Indonesia
Quantity Surveyor To be appointed Piling Contractor To be appointed Contractor To be appointed
Master Planner Townland International PT Contact Mr Johannes Spies (Director) 62 21 2941 0621 f 62 21 2941 0622 Email:
[email protected] Website: www.townland.com Granadi Building Lantai 7 Tipikal Utara, Jalan Rasuna Said Blok X - 1, Kavling 8 - 9, Kuningan, Jakarta Selatan, 12950, Jakarta, Indonesia Contact Ms Farida Devi Kurniati (Senior Urban Designer) 62 21 2941 0621 f 62 21 2941 0622 Email:
[email protected] Website: www.townland.com Granadi Building Lantai 7 Tipikal Utara, Jalan Rasuna Said Blok X - 1, Kavling 8 - 9, Kuningan, Jakarta Selatan, 12950, Jakarta, Indonesia Architect Global Rancang Selaras PT Contact Mr Adi Utomo Hatmoko (Principal Architect) 62 274 880 637 f 62 274 887 778 Email:
[email protected] Website: www.globalrancangselaras.com Jalan Apel No. 111, Nglaban, Ngaglik, Sleman, 55281, DI Yogyakarta, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
12
Sample Project of The Month PROJECT CATEGORY
PROJECT CATEGORY
Infrastructure
Residential/ Health
PROJECT STAGE
Concept
PROJECT CODE
PROJECT STAGE
145544002
Concept
PATIHAN MADIUN BRIDGE DEVELOPMENT Desa Patihan, Kecamatan Manguharjo, Madiun, East Java ● ● ● ● ● ●
PROJECT CODE
141195002
RSUD WATES HOSPITAL - DORMITORY Jalan Tentara Pelajar Km 1 No. 5 Wates, Kulon Progo, DI Yogyakarta ● ● ●
Bridge construct (35 m length x 10 m width) Reinforced concrete bridge Bridge abutment Girder bridge Bridge approach slab Bridge safety barriers
3 storey dormitory building (approx. 3,000 sq m) Up to 20 dormitory rooms Multipurpose room
Estimated cost: undisclosed. Construction is expected to start in early September 2016. Construction is expected to end in early December 2016.
Estimated cost: undisclosed.
Bangunan asrama 3 lantai, dengan luas bangunan sekitar 3.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai September 2016 dan selesai Desember 2016.
Work is expected to start in early July 2016. Work is expected to end in late December 2016. Pembangunan jembatan struktur beton bertulang dengan total panjang sekitar 35 meter dan lebar 10 meter. Perkiraan biaya: tidak dinyatakan. Pekerjaan diharapkan mulai Juli 2016 dan selesai Desember 2016.
Developer Rumah Sakit Umum Daerah (RSUD) Wates Contact Ms Lies Indriyati (Director - Kuasa Pengguna Anggaran) 62 274 773 169 f 62 274 773 092 Email:
[email protected] Website: www.rsud.kulonprogokab.go.id Jalan Tentara Pelajar Km. 1 No. 5 Wates, Kulonprogo, 55611, DI Yogyakarta, Indonesia
Government Implementing Agency Dinas Pekerjaan Umum Kota Madiun Contact Mr Ir. Danardono (Head Officer) 62 351 471 151 f 62 351 496 541 Website: www.portal.madiunkota.go.id Jalan D.I Panjaitan No. 17, Madiun, 63121, East Java, Indonesia
Contact Mr drg.Agung Sugiarto, M.Kes (Project Coordinator - Kabag administrasi dan Umum) 62 274 773 169 f 62 274 773 092 Email:
[email protected] Website: www.rsud.kulonprogokab.go.id Jalan Tentara Pelajar Km. 1 No. 5 Wates, Kulonprogo, 55611, DI Yogyakarta, Indonesia
Contact Mr Thariq Megah (Kepala Seksi Pemeliharaan Jalan dan Jembatan) 62 351 471 151 f 62 351 496 541 Website: www.portal.madiunkota.go.id Jalan D.I Panjaitan No. 17, Madiun, 63121, East Java, Indonesia
Supervisory Consultant To be appointed Supervisory Consultant To be appointed Master Planner Pola Data Consultant PT Contact Mr Nufrizal F Hanafi (Director - Project Manager) 62 274 433 3680 / 747 f 62 274 433 3680 8764 / 719 4529 Email:
[email protected] Jalan Ponpes Sunan Ampel No. 02 Banjeng, Maguwoharjo, Depok, Sleman, 55283, DI Yogyakarta, Indonesia
Civil Engineer To be appointed Bridge Contractor To be appointed
Contact Mr Eko Sulistiatmojo (Architect) 62 274 433 3680 / 747 f 62 274 433 3680 8764 / 719 4529 Email:
[email protected] Jalan Ponpes Sunan Ampel No. 02 Banjeng, Maguwoharjo, Depok, Sleman, 55283, DI Yogyakarta, Indonesia Architect To be appointed Structural Engineer To be appointed Contractor To be appointed Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
13
Sample Project of The Month PROJECT CATEGORY
PROJECT CATEGORY
Industrial
Industrial
PROJECT STAGE
PROJECT CODE
Concept
PROJECT STAGE
144316002
Concept
SAMPOERNA AGRO CPO FACTORY KALIMANTAN BARAT Site yet to be determined, West Kalimantan ● ● ● ●
PROJECT CODE
144541002
SIDO MUNCUL FOOD NUTRITION FACTORY SLEMAN Sleman, DI Yogyakarta ●
Crude palm oil plant (capacity of 30 tph) Mechanical work Conveyor lines Workshop
Single storey food nutrition factory (approx 25,000 sq m) ● Mechanical work ● Production lines ● Quality control room
Estimated cost: undisclosed. Estimated cost: undisclosed. Construction timetable is to be determined. Construction is expected to start in early January 2017. Construction is expected to end in late December 2017.
Pabrik pengolahan kelapa sawit dengan kapasitas produksi 30 ton buah tandan segar per jam. Perkiraan biaya: tidak dinyatakan. Waktu konstruksi belum ditentukan.
Bangunan pabrik nutrisi makanan satu lantai, dengan luas bangunan sekitar 25.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Januari 2017 dan selesai Desember 2017.
Developer Sampoerna Agro, Tbk PT Contact Mr Michael Kesuma (Head of Investor Relation) 62 21 577 1711 / 577 f 62 21 577 1712 / 577 0886 0015 Website: www.sampoernaagro.com Sampoerna Strategic Square, North Tower 28 Floor, Jalan Jendral Sudirman Kavling 45 - 46, Jakarta Selatan, 12930, Jakarta, Indonesia
Developer Sido Muncul Tbk PT - Semarang Factory Office Contact Mr Irwan Hidayat (President Director) 62 298 523 515 f 62 298 523 509 Email:
[email protected] Website: www.sidomuncul.com Jalan Soekarno Hatta Km. 28, Kelurahan Klepu, Kecamatan Bergas, Semarang, 50552, Central Java, Indonesia
Contact Mr Elman Salim (Project Head of Engineering Department) 62 21 577 1711 / 577 f 62 21 577 1712 / 577 0886 0015 Email:
[email protected] Website: www.sampoernaagro.com Sampoerna Strategic Square, North Tower 28 Floor, Jalan Jendral Sudirman Kavling 45 - 46, Jakarta Selatan, 12930, Jakarta, Indonesia
Contact Mr Stefanus Agus Triharyanto (Head of Building Division) 62 298 523 515 f 62 298 523 509 Email:
[email protected] Website: www.sidomuncul.com Jalan Soekarno Hatta Km. 28, Kelurahan Klepu, Kecamatan Bergas, Semarang, 50552, Central Java, Indonesia Architect To be appointed
Contact Mr Oke (Staff of Engineering Division) 62 21 577 1711 / 577 f 62 21 577 1712 / 577 0886 0015 Website: www.sampoernaagro.com Sampoerna Strategic Square, North Tower 28 Floor, Jalan Jendral Sudirman Kavling 45 - 46, Jakarta Selatan, 12930, Jakarta, Indonesia
Structural Engineer To be appointed Mechanical & Electrical Engineer To be appointed Piling Contractor To be appointed Contractor To be appointed
EPC Contractor To be appointed
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
14
Sample Project of The Month PROJECT CATEGORY
Hotel/ Recreation/ Retail PROJECT STAGE
Concept
THE RITZ CARLTON RESORTS AND SPA (5 STARS) - TANAH LOT (continued...)
PROJECT CODE
103509002
THE RITZ CARLTON RESORTS AND SPA (5 STARS) - TANAH LOT Jalan Tanah Lot, Tabanan, Bali ● ● ● ● ●
Hotel Operator The Ritz-Carlton Hotel Company L.L.C. Contact Mrs Ainslie Cheung (Regional Director) 852 2192 6207 f 852 2192 6073 Email:
[email protected] Website: www.ritzcarlton.com Suite 701, 7/F, 1063 King's Road, Hong Kong, Hong Kong, Hong Kong SAR
4 storey hotel building (approx 20,000 sq m) Up to 200 hotel rooms Hotel lobby & reception area Dining & restaurant Swimming pool
Architect Ground Kents Architect (GKA) Indonesia PT Contact Mr Marthin Grounds (Principal) 62 361 703 517 / 703 f 62 361 703 652 518 Email:
[email protected] Website: www.gkabali.com Kawasan Bukit Permai, Mimpi Resort, Jimbaran, Badung, 80361, Bali, Indonesia
Project deferred indefinitely Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : light brick walls ● Roofing : concrete roof tile ● Roof truss : lightweight steel ● Aluminium framed doors & windows / solid wood doors ● Lifts ● Split type air conditioning / duct connected air conditioning ● Sanitary ware / plumbing ● Fire protection system ● Security system ● Building automation system
Interior Designer Jaya Ibrahim, Jaya & Associates Contact Mrs Xaviera (Interior Designer) 65 6645 3575 f 65 6645 3599 Email:
[email protected] Website: www.jayainternational.com 115 Amoy Street #02-03, Singapore, Singapore 069935 Structural Engineer To be appointed Mechanical & Electrical Engineer To be appointed
Estimated cost: undisclosed.
Quantity Surveyor To be appointed
Construction timetable is to be determined.
Contractor To be appointed
Pembangunan hotel 4 lantai terdiri dari 200 kamar hotel, dengan luas bangunan sekitar 20.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Waktu konstruksi belum ditentukan. Developer Ciputra Property Tbk PT Contact Mr Artha Dinata Zakar (Director) 62 21 2988 8898 / f 62 21 2988 8899 5292 0982 / 2988 5858 Email:
[email protected] Website: www.ciputraproperty.com Jalan Prof Dr Satrio Kavling 3 - 5, Jakarta Selatan, 12940, Jakarta, Indonesia Contact Mr Antonius Andes (Staff of Project Division) 62 21 2988 8898 / f 62 21 2988 8899 5292 0982 / 2988 5858 Email:
[email protected] Website: www.ciputraproperty.com Jalan Prof Dr Satrio Kavling 3 - 5, Jakarta Selatan, 12940, Jakarta, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
15
Sample Project of The Month PROJECT CATEGORY
PROJECT CATEGORY
Hotel/ Recreation/ Retail
Residential
PROJECT STAGE
Concept
PROJECT CODE
PROJECT STAGE
145484002
Design
VEGA HOTEL YOGYAKARTA Site yet to be determined, Yogyakarta, DI Yogyakarta ● ● ● ● ●
PROJECT CODE
138879002
CITI ALIT VILLA RESIDENCE - RESIDENTIAL Jalan Raya Goa Gong, Mangupura, Badung, Bali ●
4 storey hotel building (approx. 4,000 sq m) Up to 90 hotel rooms Restaurant Lobby & reception lounge Swimming pool
200 x 2 storey residential houses (approx. 120 sq m each) ● Units to have 4 bedrooms ● Internal road network ● Gated entrance
Estimated cost: undisclosed.
Building elements include: ● Flooring : homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : light brick walls ● Roofing : concrete roof tile / concrete slab roof ● Roof truss : lightweight steel ● Timber framed doors & windows / solid wood doors
Construction timetable is to be determined. Hotel 4 lantai dengan luas bangunan sekitar 4.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Waktu konstruksi belum ditentukan. Hotel Operator Parador Hotels and Resorts Contact Mr Ricky Theodores (Chief Operating Officer) 62 21 292 15999 / 291 f 62 21 292 16999 71111 Email:
[email protected] Website: www.parador-hotels.com Atria Residences Building, Lobby Level, CBD Gading Serpong Lot #5,Jalan Boulevard Gading Serpong, Kabupaten Tangerang, 15810, Banten, Indonesia
Estimated cost: undisclosed. Construction is expected to start in early March 2017. Construction is expected to end in late March 2018. Kawasan perumahan meliputi 200 unit rumah 2 lantai, masing-masing dengan tipe luas bangunan sekitar 120 meter persegi. Perkiraan biaya : tidak dinyatakan. Konstruksi diharapkan mulai Maret 2017 dan selesai Maret 2018.
Contact Ms Pramita Sari Setiawan (Corporate Marketing Communication Manager) 62 21 292 15999 / 291 f 62 21 292 16999 71111 Email:
[email protected] Website: www.parador-hotels.com Atria Residences Building, Lobby Level, CBD Gading Serpong Lot #5,Jalan Boulevard Gading Serpong, Kabupaten Tangerang, 15810, Banten, Indonesia
Developer Citi Alits Cipta PT Contact Mr Samuel (Staff of Project Division) 62 361 474 3060 / 474 f Not available 3062 Email:
[email protected] Website: www.citialitswisata.com Jalan Letda Tantular No. 90, Renon, Denpasar, 80226, Bali, Indonesia
Architect To be appointed
Master Planner Johanes Architects Contact Mr Dipl. Ing. Johanes A Kurnia (Director) 62 21 5890 3517 / f 62 21 5890 3517 / 587 9826 5429 2482 Email:
[email protected] Website: www.johanesarchitects.com Jalan Rubi Garden I/16 (Permata Mediterania), Pos pengumben, Srengseng, Kembangan, Jakarta Barat, 11630, Jakarta, Indonesia
Structural Engineer To be appointed Mechanical & Electrical Engineer To be appointed Contractor To be appointed
Architect Johanes Architects Contact Mr Dipl. Ing. Johanes A Kurnia (Director) 62 21 5890 3517 / f 62 21 5890 3517 / 587 9826 5429 2482 Email:
[email protected] Website: www.johanesarchitects.com Jalan Rubi Garden I/16 (Permata Mediterania), Pos pengumben, Srengseng, Kembangan, Jakarta Barat, 11630, Jakarta, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
16
Sample Project of The Month PROJECT CATEGORY
Residential CITI ALIT VILLA RESIDENCE - RESIDENTIAL (continued...)
PROJECT STAGE
Design
PROJECT CODE
136313002
CITRALAND CITY LOSARI MAKASSAR - SUNSET COVE CLUSTER Centre Point of Indonesia, Losari, Makassar, South Sulawesi
Contact Mr Agung R (Senior Architect) 62 21 5890 3517 / f 62 21 5890 3517 / 587 9826 5429 2482 Email:
[email protected] Website: www.johanesarchitects.com Jalan Rubi Garden I/16 (Permata Mediterania), Pos pengumben, Srengseng, Kembangan, Jakarta Barat, 11630, Jakarta, Indonesia
● ● ● ● ● ●
Structural Engineer To be appointed Mechanical & Electrical Engineer To be appointed
139 x 2 storey residential houses (3 types of houses : 120 sq m, 200 sq m & 240 sq m) Units to have 3 & 4 bedrooms Internal road network Gated entrance Communal garden Perimeter fence walls
Please find more information at www.citralandcitymakassar.com
Contractor To be appointed
Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : light brick walls ● Roofing : concrete slab roof / metal sheet roofing ● Roof truss : lightweight steel ● Aluminium framed doors & windows / fabricated wood doors ● Sanitary ware / plumbing Estimated cost: undisclosed. Construction is expected to start in early June 2016. Construction is expected to end in late December 2017. Kawasan perumahan meliputi 139 unit rumah 2 lantai, dengan 3 tipe luas bangunan sekitar 120, 200 dan 240 meter persegi. Perkiraan biaya : tidak dinyatakan. Konstruksi diharapkan mulai Juni 2016 dan selesai Desember 2017. Developer Ciputra Fajar Mitra PT (aka Ciputra Group) Contact Mr Tony Kustono (General Manager - Joint Operation Ciputra Fajar Mitra PT - Yasmin Bumi Asri PT) 62 411 822 2288 / 822 f 62 411 822 2299 2299 Jalan Tun Abdul Razak (Hertasning Baru), Gowa, 90232, South Sulawesi, Indonesia Contact Mr Abdul Hakim (Inhouse Architect - Staf of Planning Division) 62 411 822 2288 / 822 f 62 411 822 2299 2299 Jalan Tun Abdul Razak (Hertasning Baru), Gowa, 90232, South Sulawesi, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
17
Sample Project of The Month PROJECT CATEGORY
Hotel/ Recreation/ Retail CITRALAND CITY LOSARI MAKASSAR - SUNSET COVE CLUSTER (continued...)
PROJECT STAGE
Design
PROJECT CODE
135317002
LOMBOK EPICENTRUM - HOTEL (4 STARS) Jalan Sriwijaya, Mataram, West Nusa Tenggara
Yasmin Bumi Asri PT Contact Mr Adityawarman M Kouwagam (Director) Not available f Not available Jalan Kakatua II, Makassar, 90133, South Sulawesi, Indonesia (For enquiry, please contact by Mail.)
● ● ● ● ●
Citraland City Makassar Contact Mr Cipta Harun (Manager - Citraland City Makassar Project) 62 411 873 625 f 62 411 873 625 Email:
[email protected] Website: www.citralandcitymakassar.com Jalan Citraland Boulevard No. 6 , Centre Point of Indonesia, Makassar, 90224, South Sulawesi, Indonesia
16 storey hotel (approx 15,000 sq m) 400 hotel rooms Hotel lobby & reception lounge Dining & restaurant Swimming pool
Project deferred indefinitely Building elements include: ● Flooring : homogeneous tile / wood flooring ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : light brick walls ● Roofing : concrete slab roof ● Aluminium framed doors & windows / fabricated wood doors ● Piling : bored pile / precast pile ● Lifts ● Duct connected air conditioning ● Fire protection system / security system ● Sanitary ware / plumbing ● Building automation system
Land Development Consultant Witteveen + Bos Consulting Engineers Contact Mr Sawarendro (Master Planner Engineer) 62 21 719 1282 f 62 21 719 1283 Email:
[email protected] Website: www.witteveenbos.com Park View Plaza 6th Floor JalanTaman Kemang No. 27, Jakarta Selatan, 12730, Jakarta, Indonesia Architect DP Architects Pte Ltd Contact Mr Wu Tzu Chiang (Project Director - Principal Architect) 65 6338 3988 f 65 6337 9989 Email:
[email protected] Website: www.dpa.com.sg 6 Raffles Boulevard #04-100 Marina Square, Singapore 039594
Estimated cost: undisclosed. Construction timetable is to be determined. Bangunan hotel 16 lantai, dengan luas bangunan sekitar 15.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Waktu konstruksi tidak ditentukan. Developer Sriwijaya Propindo Utama PT Contact Mr Adi Putra (Project Coordinator) 62 370 631 777 / 631 f 62 370 648 129 888 Email:
[email protected] Jalan Sriwijaya, Mataram, 83121, West Nusa Tenggara, Indonesia
Quantity Surveyor To be appointed Earthworks Contractor Pembangunan Perumahan (Persero) Tbk PT - Kantor Cabang VIII - Makassar Contact Mr Fatchul Birri (Branch Manager) 62 411 887 879 / 868 f 62 411 868 692 701 Email:
[email protected] Website: www.pt-pp.com Jalan Letjen Hertasning Blok II No. 1, Makassar, 90222, South Sulawesi, Indonesia
Hotel Operator To be appointed Investor Varindo Lombok Inti PT Contact Mr Gede Agus Surya Primayadi (Managing Director) 62 370 635 421 / 626 f 62 370 622 5333 620 / 661 1111 Email:
[email protected] Jalan Langko No 36A, Mataram, 83114, West Nusa Tenggara, Indonesia
Contact Mr Muliadi (Staff of Procurement Division) 62 411 887 879 / 868 f 62 411 868 692 701 Email:
[email protected] Website: www.pt-pp.com Jalan Letjen Hertasning Blok II No. 1, Makassar, 90222, South Sulawesi, Indonesia
Contact Mrs Fauza (Architect / Technical Manager) 62 370 635 421 / 626 f 62 370 622 5333 620 / 661 1111 Email:
[email protected] Jalan Langko No 36A, Mataram, 83114, West Nusa Tenggara, Indonesia
Contractor To be appointed
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
18
Sample Project of The Month PROJECT CATEGORY
Residential/ Recreation/ Retail/ Car Park LOMBOK EPICENTRUM - HOTEL (4 STARS) (continued...)
PROJECT STAGE
PROJECT CODE
Design
129469002
SENTUL CITY - SENTUL GARDEN APARTMENT (TOWER A) Jalan M.H. Thamrin, Komplek Sentul City, Bogor, West Java
Master Planner ¿¿McKingley Team Architects Contact Mr Sahlan Mckingley (Director - Principal Architect) 612 9299 9779 f 612 9299 9779 Email:
[email protected] Website: www.mt-architect.com 72 Erskine St, Sydney, New South Wales NSW 2000, Australia
● ● ●
Architect ¿¿McKingley Team Architects Contact Mr Sahlan Mckingley (Director - Principal Architect) 612 9299 9779 f 612 9299 9779 Email:
[email protected] Website: www.mt-architect.com 72 Erskine St, Sydney, New South Wales NSW 2000, Australia
● ● ● ● ● ● ●
16 storey apartment tower (approx 25,100 sq m) Up to 448 apartment units Studio type apartments (approx. 23 sq m), single bedroom units (approx. 27 sq m), & 2 bedroom units (approx. 48 sq m) 2 basement levels car park Apartment lobby & reception area Ground floor retail shops & restaurants Swimming pool Rooftop garden Gym & fitness centre Citywalk, café & convenience store
Building elements include: ● Flooring : ceramic tile / homogeneous tile / hardened concrete floor ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : precast concrete panel / gypsum board ● Facade : glass wall cladding / decorative cladding ● Aluminium framed doors & windows / fabricated doors ● 5 ifts ● Split type air conditioning / duct connected air conditioning ● Pilling : bored pile ● Sanitary ware / plumbing ● Fire protection system ● Security system ● Building automation system
Contact Mrs Cory Elisabeth (Architect - Project Division) 612 9299 9779 f 612 9299 9779 Email:
[email protected] Website: www.mt-architect.com 72 Erskine St, Sydney, New South Wales NSW 2000, Australia Interior Designer To be appointed Mechanical & Electrical Engineer To be appointed Contractor To be appointed
Estimated cost: Rp150.60 bn (US$10.90 mn). Construction is expected to start in early August 2016. Construction is expected to end in late August 2018. Apartemen 16 lantai dan 2 level basement, dengan luas bangunan sekitar 25.100 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Agustus 2016 dan selesai Agustus 2018. Developer Sentul City Tbk PT Contact Mr Adi Dharmawan (Project Manager) 62 21 8792 6555 f 62 21 8792 6555 Email:
[email protected] Website: www.sentulcity.co.id Jalan M H Thamrin Kav.8, Sentul City, Bogor, 16810, West Java, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
19
Sample Project of The Month PROJECT CATEGORY
Community/ Education and Research SENTUL CITY - SENTUL GARDEN APARTMENT (TOWER A) (continued...)
PROJECT STAGE
Design
PROJECT CODE
145235002
UNIVERSITAS SAMUDRA - AUDITORIUM Gampong Meurandeh, Kecamatan Langsa Lama, Langsa, Aceh
Contact Mr Petra Firman Pakpahan (Planning Division Staff) 62 21 8792 6555 / f 62 21 8796 0778 / 8796 1889 8796 1777 Email:
[email protected] Website: www.sentulcity.co.id Gedung Graha Utama, Jalan M.H. Thamrin No. 1 Kavling 8, Sentul City, Bogor, 16810, West Java, Indonesia
● ● ● ●
Architect Kind Indonesia Architects Contact Mr Adjie Negara (Principal Architect) 62 21 2995 9825 f 62 21 8771 0575 Email:
[email protected] Website: www.kind.id Citylofts Sudirman Suite 1516, Jalan K.H. Mas Mansyur No. 121, Jakarta Pusat, 10220, Jakarta, Indonesia
3 storey auditorium building (approx 9,000 sq m) Lobby lounge Auditorium balcony Equipment room
Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : light brick walls ● Roofing : concrete roof tile ● Roof truss : steel frame ● Aluminium framed doors & windows / fabricated wood doors ● Sanitary ware / plumbing
Contact Ms Siti Aisah Ghani (Team Leader / Architect) 62 21 8771 6431 f 62 21 8771 6431 Email:
[email protected] Website: www.kind.id Jalan Komjen Polisi M. Yasin, Cimanggis, Depok, 16452, West Java, Indonesia
Estimated cost: undisclosed. Construction is expected to start in early April 2016. Construction is expected to end in late November 2016.
Structural Engineer To be appointed
Gedung auditorium 3 lantai dengan luas bangunan sekitar 9.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai April 2016 dan selesai November 2016.
Mechanical & Electrical Engineer To be appointed Piling Contractor To be appointed Contractor To be appointed
Developer Universitas Samudra Contact Mr Drs. Bachtiar Akob, M.Pd (Rector) 62 641 426 534 f 62 641 426 535 Email:
[email protected] Website: www.unsam.ac.id Gampong Meurandeh, Kecamatan Langsa Lama, Langsa, 24416, Aceh, Indonesia Contact Mr Tuti Israyani, SP (Kasubbag Perencanaan) 62 641 426 534 f 62 641 426 535 Email:
[email protected] Website: www.unsam.ac.id Gampong Meurandeh, Kecamatan Langsa Lama, Langsa, 24416, Aceh, Indonesia Supervisory Consultant To be appointed Architect Inochi Konsultan PT Contact Mr Rickie Andre (Director) 62 651 29602 f Not available Email:
[email protected] Jalan Teuku Panglima Nyak Makam No. 5, Gampong Kota Baru, Kecamatan Kuta Alam, Banda Aceh, 23125, Aceh, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
20
Sample Project of The Month PROJECT CATEGORY
Hotel/ Retail/ Recreation/ Car Park UNIVERSITAS SAMUDRA - AUDITORIUM (continued...)
PROJECT STAGE
Design Contact Ms Cut Sri Sukma (Project Coordinator) 62 651 29602 f Not available Email:
[email protected] Jalan Teuku Panglima Nyak Makam No. 5, Gampong Kota Baru, Kecamatan Kuta Alam, Banda Aceh, 23125, Aceh, Indonesia
PROJECT CODE
144877002
YELLO HOTEL (3 STARS) - RUNGKUT SURABAYA Jalan Raya Rungkut, Surabaya, East Java ● ● ● ● ● ●
Contractor To be appointed
13 storey hotel building (approx 9,000 sq m) Single basement level car park Hotel lobby & reception area Dining & restaurant Banquet & function hall Swimming pool
Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board / acoustical ceiling ● Walling : precast concrete panel / gypsum board / light brick walls ● Facade : glass wall cladding / decorative cladding ● Aluminium framed doors & windows / solid wood doors ● Lifts ● Split type air conditioning / duct connected air conditioning ● Sanitary ware / plumbing ● Fire protection system / security system ● Building automation system Estimated cost: undisclosed. Construction is expected to start in early October 2016. Construction is expected to end in late December 2017. Pembangunan hotel 13 lantai dan satu level basement, dengan luas bangunan sekitar 9.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Oktober 2016 dan selesai Desember 2017. Hotel Operator Tauzia Hotel Management Contact Mr Armand Steinmeyer (Head of Business Development) 62 21 526 5223 / 5296 f 62 21 526 5213 0490 ext 104 Email:
[email protected] Website: www.tauzia.com K-link Tower 25th Floor - Suite B, Jalan Jendral Gatot Subroto Kavling 59A, Jakarta Selatan, 12950, Jakarta, Indonesia Architect Urbane Indonesia PT Contact Mr Irvan P Darwis (Senior Architect) 62 22 253 1004 f 62 22 253 1024 Email:
[email protected] Website: www.urbane.co.id Jalan Cigadung Raya Barat No. 5, RT 005 / RW 002, Cipaheut Kelurahan Cigadung, Bandung, 40191, West Java, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
21
Sample Project of The Month PROJECT CATEGORY
Residential/ Hotel/ Exhibition/ Recreation/ Retail YELLO HOTEL (3 STARS) - RUNGKUT SURABAYA (continued...)
PROJECT STAGE
PROJECT CODE
Documentation
116611002
AMARSVATI RESORT & CONDOTEL (5 STARS) AVANI TOWER Jalan Raya Malimbu, Lombok Utara, West Nusa Tenggara
Contact Mr Angga Latief (Architect) 62 22 253 1004 f 62 22 253 1024 Email:
[email protected] Website: www.urbane.co.id Jalan Cigadung Raya Barat No. 5, RT 005 / RW 002, Cipaheut Kelurahan Cigadung, Bandung, 40191, West Java, Indonesia
● ● ●
Structural Engineer To be appointed
● ● ● ● ●
Mechanical & Electrical Engineer To be appointed Quantity Surveyor To be appointed Piling Contractor To be appointed Contractor To be appointed
14 storey apartment & hotel building (approx 18,250 sq m) 150 apartment units & hotel rooms Studio type units, 1 bedroom units (type of units: approx 45.43 sq m each) Cafe & restaurant Fitness centre & spa Banquet & function room Lobby & reception area Swimming pool
Please find more information at www.amarsvati.com Building elements include: ● Flooring : marble tile / granite flooring / parquet / carpet ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : light brick walls / precast concrete panel ● Roofing : concrete slab roof ● Aluminium framed windows / solid wood doors ● Piling : bored pile ● Lifts ● Split type air conditioning / duct connected air conditioning ● Fire protection system ● Security system ● Sanitary ware / plumbing ● Building automation system Estimated cost: undisclosed. Construction is expected to start in early May 2016. Construction is expected to end in late December 2017. Kondotel 14 lantai dengan luas bangunan sekitar 18.250 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Mei 2016 dan selesai Desember 2017. Developer North Pacific Development PT (aka Pollux Properties Indonesia) Contact Mr Nico Purnomo Po (Chief Executive Officer) 62 21 515 1036 f 62 21 515 1037 Email:
[email protected] Website: www.pollux.co.id Sudirman Central Business District, Jalan Jendral Sudirman Kavling 52-53, Indonesia Stock Exchange Building Tower II #28-01, Jakarta Selatan, 12190, Jakarta, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
22
Sample Project of The Month AMARSVATI RESORT & CONDOTEL (5 STARS) AVANI TOWER (continued...)
AMARSVATI RESORT & CONDOTEL (5 STARS) AVANI TOWER (continued...)
Contact Ms Andriana Neysa Sutanto (Project Manager / Architect) 62 21 515 1036 f 62 21 515 1037 Email:
[email protected] Website: www.pollux.co.id Sudirman Central Business District, Jalan Jendral Sudirman Kavling 52-53, Indonesia Stock Exchange Building Tower II #28-01, Jakarta Selatan, 12190, Jakarta, Indonesia
Interior Designer Dreammetal Contact Mr Raymon Cheng (Principal Architect) 65 9878 8687 / 9764 f Not available 0206 Email:
[email protected] Website: www.dreammetal.net 4B Boon Tiong Road #07 - 33, Singapore, Singapore 165004
Mega Citra Prima PT Contact Undisclosed 62 21 2992 8020 f 62 21 2992 0060 Email:
[email protected] Jalan M. H. Thamrin Kavling 20 - 30, The Plaza Indonesia #45 - 1A, Jakarta Pusat, 10350, Jakarta, Indonesia
Structural Engineer Rekacipta Kinematika PT Contact Mr Sugia Mulyana (Project Director) 62 21 8430 6407 f 62 21 8430 6407 Email:
[email protected] Website: www.kinematika.com Kawasan Niaga Citragrand, Blok R12 No. 3, Jalan Alternatif Cibubur - Cileungsi Km. 4, Jatisampurna, Bekasi, 17435, West Java, Indonesia
Consultant Remarks: Furniture Consultant & Supplier Mahakarya Warisan Nusantara PT (aka Arbor & Troy) Contact Mr Kemal (Staff of Project Division) 62 21 719 9070 f 62 21 721 0529 Website: www.mahakarya-indonesia.com The Papilion Kemang, Jalan Kemang Raya No. 45 AA, Jakarta Selatan, 12730, Jakarta, Indonesia
Contact Mr Leonardi Kawidjaja (Project Manager) 62 21 8430 6407 f 62 21 8430 6407 Email:
[email protected] Website: www.kinematika.com Kawasan Niaga Citragrand, Blok R12 No. 3, Jalan Alternatif Cibubur - Cileungsi Km. 4, Jatisampurna, Bekasi, 17435, West Java, Indonesia
Hotel Operator Ariva Hospitality Contact Mr Cameron Ong (Director) 65 6848 5029 f 65 6848 1083 Email:
[email protected] Website: www.stayariva.com 12 Tannery Road 02 - 05 HB Centre 1, Singapore, Singapore 347722
Mechanical & Electrical Engineer Metakom Pranata PT Contact Mr Agus Joko Triyanto (Project Coordinator) 62 21 582 3167 / 582 f 62 21 582 3168 6178 Email:
[email protected] Website: www.metakom-pranata.com Puri Kencana Blok K7 No. 2 E - F, Kembangan, Jakarta Barat, 11610, Jakarta, Indonesia
Contact Mr Stanley Ling (Chief Executive Officer) 65 6848 5029 f 65 6848 1083 Email:
[email protected] Website: www.stayariva.com 12 Tannery Road 02 - 05 HB Centre 1, Singapore, Singapore 347722
Piling Contractor Satria Cipta Astakencana PT Contact Mr Rudy Setyawan (Director & Project Manager) 62 361 463 451 f 62 361 462 773 Email:
[email protected] Jalan Sekar Jepun No 4 Gatot Subroto Timur, Denpasar, 80237, Bali, Indonesia
Architect Arkonin PT Contact Mrs Sita Budi Saptawati (Architect) 62 21 736 4176 f 62 21 736 3829 Email:
[email protected] Website: www.arkonin-id.com Gedung Arkonin, Jalan Bintaro Taman Timur, Bintaro Jaya Sektor I, Jakarta Selatan, 12330, Jakarta, Indonesia
Contractor To be appointed
Contact Ms Nadya Karina (Architect) 62 21 736 4176 f 62 21 736 3829 Email:
[email protected] Website: www.arkonin-id.com Gedung Arkonin, Jalan Bintaro Taman Timur, Bintaro Jaya Sektor I, Jakarta Selatan, 12330, Jakarta, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
23
Sample Project of The Month PROJECT CATEGORY
Residential/ Recreation/ Car Park PROJECT STAGE
PROJECT CODE
Documentation
131227002
BANDUNG NASUTION SUPERBLOCK - APARTMENT TOWER A (continued...)
BANDUNG NASUTION SUPERBLOCK APARTMENT TOWER A Jalan A H. Nasution, Bandung, West Java ● ● ● ● ● ● ●
Contact Mr Ahmad Dani (Director & Team Leader) 62 22 540 5602 / 543 f 62 22 540 5602 3946 / 541 6631 Email:
[email protected] Jalan Manglid No. 25, Kopo Sayati, Bandung, 40226, West Java, Indonesia
27 storey apartment tower (approx. 30,000 sq m) 900 apartment units Studio type apartments, single bedroom units & 2 bedroom units Single basement level car park Apartment lobby & reception lounge Ground floor retail shops & restaurants Swimming pool
Contact Mr Radi (Team Leader) 62 22 540 5602 / 543 f 62 22 540 5602 3946 / 541 6631 Email:
[email protected] Jalan Manglid No. 25, Kopo Sayati, Bandung, 40226, West Java, Indonesia
Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : precast concrete panels / light brick wall ● Facade : glass wall cladding ● Roofing : concrete roof tile / concrete slab roof ● Aluminium framed doors & windows / fabricated wood doors ● Piling : mini pile / bored pile ● Lifts ● Sanitary ware / plumbing ● Fire protection system ● Security system ● Building automation system
Architect Recta Optima PT Contact Mr Hansen Setiawan (Team Leader / Architect) 62 22 727 2052 f 62 22 727 2052 Email:
[email protected] Jalan Pratista Raya No. 49, Bandung, 40291, West Java, Indonesia Contact Mr Rovi (Architect) 62 22 727 2052 f 62 22 727 2052 Email:
[email protected] Jalan Pratista Raya No. 49, Bandung, 40291, West Java, Indonesia
Estimated cost: Rp152.00 bn (US$11.26 mn).
Structural Engineer Recta Optima PT Contact Ms Paulina Jacintha (Structural Engineer) 62 22 727 2052 f 62 22 727 2052 Email:
[email protected] Jalan Pratista Raya No. 49, Bandung, 40291, West Java, Indonesia
Construction is expected to start in early December 2016. Construction is expected to end in late December 2018. Apartemen 27 lantai dan satu level basement, dengan luas bangunan sekitar 30.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Desember 2016 dan selesai Desember 2018.
Mechanical & Electrical Engineer To be appointed Piling Contractor To be appointed
Developer Robben Graha Mandiri PT Contact Mr Benny Yoshawirja (Director / Project Coordinator) 62 22 423 7518 / 422 f 62 22 423 9688 3237 Email:
[email protected] Pecinan Lama No. 9, Bandung, 40111, West Java, Indonesia
Contractor To be appointed
Environmental Impact Assessment Teisar Cipta Sarana PT (aka Denisa Purnama CV) Contact Ms Yunita Pusparini (Ririn) (Project Division Staff) 62 22 540 5602 / 543 f 62 22 540 5602 3946 / 541 6631 Email:
[email protected] Jalan Manglid No. 25, Kopo Sayati, Bandung, 40226, West Java, Indonesia Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
24
Sample Project of The Month PROJECT CATEGORY
Health/ Education and Research/ Car Park PROJECT STAGE
PROJECT CODE
Documentation
140714002
HOSPITAL - JALAN RAYA SOLO - SRAGEN (continued...)
HOSPITAL - JALAN RAYA SOLO - SRAGEN Jalan Raya Solo - Sragen (eks PT Palur Raya), Jaten, Karanganyar, Central Java ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ●
Developer Gapura Mas Asri PT Contact Mr Arya Wiryawan (Project Director) 62 271 821 363 / 821 f 62 271 821 363 / 825 800 / 825 888 405 Email:
[email protected] Jalan Raya Palur Km 9,1, Karanganyar, 57771, Central Java, Indonesia
4 storey hospital (approx. 12,000 sq m) Inpatient care unit Emergency unit Polyclinic unit Surgical unit Medical laboratory Medical consulting rooms Patient medical record room Patient recovery rooms Obstetrics & gynaecology unit Registration area & waiting room Observation room Pharmacy room Neonatal Intensive Care Unit (NICU) Medical equipment storage room At grade car park
Contact Mr Yudi (Project Manager) 62 271 821 363 / 821 f 62 271 821 363 / 825 800 / 825 888 405 Email:
[email protected] Jalan Raya Palur Km 9,1, Karanganyar, 57771, Central Java, Indonesia Architect Megatika International PT - Pos Pengumben Office Contact Mr Joe Louis Widodo (Design Director) 62 21 5365 1221 f 62 21 5365 0880 Email:
[email protected] Website: www.megatika.com Komplek Apartemen Permata Eksekutif, Gedung Kantor Lantai 3, Jalan Pos Pengumben, Jakarta Barat, 11550, Jakarta, Indonesia
Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board / acoustical ceiling ● Walling : light brick walls ● Facade : glass wall cladding / aluminium composite cladding ● Roofing : concrete slab roof ● Aluminium framed doors & windows / fabricated wood doors ● Lifts ● Split type air conditioning / duct connected air conditioning ● Fire protection system ● Security system ● Sanitary ware ● Building automation system
Contact Mr Frendy Martin Sudewo (Architect) 62 21 5365 1221 f 62 21 5365 0880 Email:
[email protected] Website: www.megatika.com Komplek Apartemen Permata Eksekutif, Gedung Kantor Lantai 3, Jalan Pos Pengumben, Jakarta Barat, 11550, Jakarta, Indonesia Structural Engineer Cipta Sukses PT Contact Mr Anwar Susanto (Director / Project Coordinator) 62 21 5596 3655 f 62 21 5595 8211 Email:
[email protected] Ruko Pelangi Blok H No. 11, Taman Palem Lestari, Cengkareng, Jakarta Barat, 11730, Jakarta, Indonesia
Estimated cost: undisclosed.
Mechanical & Electrical Engineer To be appointed
Construction is expected to start in early January 2017. A completion date is to be determined.
Quantity Surveyor To be appointed
Bangunan rumah sakit 4 lantai dengan luas bangunan sekitar 12.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Januari 2017. Waktu penyelesaian belum ditentukan.
Contractor To be appointed
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
25
Sample Project of The Month PROJECT CATEGORY
Hotel/ Car Park/ Retail PROJECT STAGE
PROJECT CODE
Documentation
140180002
HOTEL - JALAN SUMATERA GRESIK (3 STARS) (continued...)
HOTEL - JALAN SUMATERA GRESIK (3 STARS) Jalan Sumatera, Kebomas, Gresik, East Java ● ● ● ● ●
Architect Megatika International PT - Pos Pengumben Office Contact Mr Joe Louis Widodo (Design Director) 62 21 5365 1221 f 62 21 5365 0880 Email:
[email protected] Website: www.megatika.com Komplek Apartemen Permata Eksekutif, Gedung Kantor Lantai 3, Jalan Pos Pengumben, Jakarta Barat, 11550, Jakarta, Indonesia
11 storey hotel building (approx 7,800 sq m) Up to 140 hotel rooms Hotel lobby & reception lounge Dining & restaurant At grade car park
Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board / acoustical ceiling ● Walling : light brick walls ● Facade : glass wall cladding / aluminium composite cladding ● Roofing : concrete slab roof ● Aluminium framed doors & windows / fabricated wood doors ● Piling : bored pile / precast pile ● Lifts ● Split type air conditioning / duct connected air conditioning ● Fire protection system ● Security system ● Sanitary ware / plumbing ● Building automation system
Contact Mr Hadijanto (Architect) 62 21 5365 1221 f 62 21 5365 0880 Email:
[email protected] Website: www.megatika.com Komplek Apartemen Permata Eksekutif, Gedung Kantor Lantai 3, Jalan Pos Pengumben, Jakarta Barat, 11550, Jakarta, Indonesia Structural Engineer To be appointed Mechanical & Electrical Engineer Tritunggal Global Mahakarya PT Contact Mr Indra Pranaka (Project Director) 62 21 7888 1457 f 62 21 7888 1457 Email:
[email protected] Jalan Raya Lenteng Agung No. 26 A, RT 05 / RW 08, Lenteng Agung, Jakarta Selatan, 12610, Jakarta, Indonesia
Estimated cost: undisclosed.
Quantity Surveyor To be appointed
Construction is expected to start in early December 2016. Construction is expected to end in early November 2017.
Contractor To be appointed
Bangunan hotel 11 lantai dengan luas bangunan sekitar 7.800 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Desember 2016 dan selesai Desember 2017. Developer Bumi Lingga Pertiwi PT Contact Mr Ir. Rahmat Ridho MBA (Director) 62 31 393 0777 / 349 f 62 31 393 0666 30777 Email:
[email protected] Website: www.blp-property.com Jalan Jawa No. 99, Gresik Kota Baru, Gresik, 61114, East Java, Indonesia Contact Mr Yanto (Project Manager) 62 31 393 0777 / 349 f 62 31 393 0666 30777 Email:
[email protected] Website: www.blp-property.com Jalan Jawa No. 99, Gresik Kota Baru, Gresik, 61114, East Java, Indonesia Hotel Operator To be appointed Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
26
Sample Project of The Month PROJECT CATEGORY
Residential/ Infrastructure/ Recreation PROJECT STAGE
PROJECT CODE
Documentation
137759002
PARAMOUNT HILLS MANADO - RESIDENCES (continued...)
PARAMOUNT HILLS MANADO - RESIDENCES Malalayang, Manado, North Sulawesi ● ● ● ● ● ●
Paramount Hills Manado Contact Mr Nawawi (Associate Director) 62 813 1123 0188 f Not available Jalan Wolter Monginsidi, Malalayang, Manado, 95115, North Sulawesi, Indonesia
754 x 2 storey residential houses (4 types of houses : 103 sq m, 110 sq m, 161 sq m & 182 sq m) Units to have 3 & 4 bedrooms Internal road network Gated entrance Communal garden Perimeter fence walls
Architect Paramount Enterprise International PT Contact Mr Pramudya Djati Asmoro (Architect) 62 21 5420 0888 / f 62 21 547 4335 5420 0999 Website: www.paramount-land.com Paramount Plaza, Jalan Boulevard Raya Gading Serpong Kavling 1, Gading Serpong, Kabupaten Tangerang, 15810, Banten, Indonesia
Please find more information at www.paramountland.com/project/residential/335/paramount-hills-manado/ Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : light brick walls ● Roofing : concrete roof tile / concrete slab roof ● Roof truss : lightweight steel ● Aluminium framed doors & windows / fabricated wood doors ● Sanitary ware / plumbing
Quantity Surveyor Paramount Enterprise International PT Contact Mr Sutikno (Staff of Purchasing Division) 62 21 5420 0888 / f 62 21 547 4335 5420 0999 Website: www.paramount-land.com Paramount Plaza, Jalan Boulevard Raya Gading Serpong Kavling 1, Gading Serpong, Kabupaten Tangerang, 15810, Banten, Indonesia
Estimated cost: undisclosed.
Contractor To be appointed
Construction is expected to start in early July 2016. Construction is expected to end in early December 2018. Kawasan perumahan meliputi 754 unit rumah 2 lantai, dengan 4 tipe luas bangunan sekitar 103, 110, 161 dan 182 meter persegi. Perkiraan biaya : tidak dinyatakan. Konstruksi diharapkan mulai Juli 2016 dan selesai Desember 2018. Developer Paramount Enterprise International PT Contact Mr Aryo Tri Ananto (Technical Director) 62 21 5420 0888 / f 62 21 547 4335 5420 0999 Website: www.paramount-land.com Paramount Plaza, Jalan Boulevard Raya Gading Serpong Kavling 1, Gading Serpong, Kabupaten Tangerang, 15810, Banten, Indonesia Contact Ms Esther Yuanita (Corporate Secretary / Corporate Communication) 62 21 5420 0888 / f 62 21 547 4335 5420 0999 Email:
[email protected] Website: www.paramount-land.com Paramount Plaza, Jalan Boulevard Raya Gading Serpong Kavling 1, Gading Serpong, Kabupaten Tangerang, 15810, Banten, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
27
Sample Project of The Month PROJECT CATEGORY
Education and Research PROJECT STAGE
PROJECT CODE
Documentation
135128002
PELITA HARAPAN SCHOOL (continued...)
PELITA HARAPAN SCHOOL Jalan Honggowongso, Surakarta, Central Java ● ● ● ● ● ●
Local Architect Prima Detailindo PT (aka Detail Studio Engineering Consultant) Contact Mr Erwin Cahyadi (Director / Project Coordinator) 62 21 5596 3206 f 62 21 5596 3206 Email:
[email protected] Website: www.primadetailindo.com Ruko Taman Palem Lestari, Ruko Pelangi Blok J No. 9, Cengkareng Barat, Jakarta Barat, 11730, Jakarta, Indonesia
5 storey school building (approx 2,300 sq m) 12 classrooms Administration office Library room Practical room Teacher rooms
Foreign Architect DP Architects Pte Ltd Contact Mr Wu Tzu Chiang (Project Director - Principal Architect) 65 6338 3988 f 65 6337 9989 Email:
[email protected] Website: www.dpa.com.sg 6 Raffles Boulevard #04-100 Marina Square, Singapore 039594
Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : light brick walls ● Facade : glass wall cladding / aluminium composite cladding ● Roofing : concrete slab roof ● Aluminium framed doors & windows / fabricated wood doors ● Lifts ● Split type air conditioning ● Fire protection system ● Sanitary ware
Structural Engineer Satu Rekayasa Optima PT Contact Mr Yoas Yuniananta (Team Leader / Structural Engineer) 62 21 2903 4281 f 62 21 2903 4281 Email:
[email protected] APL Tower Lantai 18 Suite P3 Central Park, Jakarta Barat, 11470, Jakarta, Indonesia
Estimated cost: undisclosed.
Contact Mrs Jennifer Khoo (Civil Engineer) 62 21 2903 4281 f 62 21 2903 4281 Email:
[email protected] APL Tower Lantai 18 Suite P3 Central Park, Jakarta Barat, 11470, Jakarta, Indonesia
Construction is expected to start in early December 2016. Construction is expected to end in early July 2017. Gedung sekolah 5 lantai terdiri dari 12 kelas dengan luas bangunan sekitar 2.300 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Desember 2016 dan selesai Juli 2017.
Mechanical & Electrical Engineer Meco Systech Internusa PT Contact Mr Bartholomeus Brajaguna Aritonang (Project Engineer) 62 21 726 0817 / 726 f 62 21 726 0249 0841 Email:
[email protected] Jalan Kebayoran Lama No. 194 A, Blok B7-8, Kebayoran Lama, Jakarta Selatan, 12220, Jakarta, Indonesia
Developer Lippo Karawaci Tbk PT Contact Mr Eko Wahyudi (Design Manager) 62 21 5579 0190 / f 62 21 5579 7109 5577 7808 / 5579 0191 Email:
[email protected] Website: www.lippokarawaci.co.id 2112 Boulevard Gajah Mada #01- 01, Lippo Cyber Park, Lippo Karawaci Utara, Tangerang, 15811, Banten, Indonesia
Contractor To be appointed
Architect Lippo Karawaci Tbk PT Contact Mr Eko Wahyudi (Design Manager) 62 21 5579 0190 / f 62 21 5579 7109 5577 7808 / 5579 0191 Email:
[email protected] Website: www.lippokarawaci.co.id 2112 Boulevard Gajah Mada #01- 01, Lippo Cyber Park, Lippo Karawaci Utara, Tangerang, 15811, Banten, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
28
Sample Project of The Month PROJECT CATEGORY
Residential/ Car Park/ Hotel/ Retail/ Recreation PROJECT STAGE
PROJECT CODE
Documentation
109233002
PREMIERE CLASSE CONDOTEL (3 STARS) (continued...)
PREMIERE CLASSE CONDOTEL (3 STARS) Jalan HMS Mitaredja, Exit tol Baros 2, Cimahi, West Java ● ● ● ● ● ●
Triputra Karya Agung PT - Bandung Contact Mr Anto (Estimator) 62 22 8888 4145 / f 62 8888 4148 8888 4148 Jalan HMS Mitadiredja, Exit tol Baros 2, Cimahi, 40521, West Java, Indonesia
15 storey apartment & hotel tower (approx 21,000 sq m) 440 apartment units & hotel rooms 2 basement levels car park Lobby & reception lounge Ground floor retail shops & restaurants Swimming pool
Hotel Operator Golden Tulip Hotel Indonesia Contact Mr Mark Van Ogtrop (Managing Director - Golden Tulip South East Asia) 62 21 527 0215 f 62 21 527 0216 Email:
[email protected] Website: www.goldentulip.com/id/asia-and-pacific/indonesia Menara Global Lantai 12, Jalan Jendral Gatot Subroto Kavling 27, Jakarta Selatan, 12950, Jakarta, Indonesia
Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structures : reinforced concrete ● Ceiling : gypsum board ● Walling : precast concrete panels / light brick walls ● Facade : glass wall cladding / aluminium composite cladding ● Roofing : concrete roof tile / concrete slab roof ● Aluminium framed doors & windows / solid wood doors ● Duct connected air conditioning / split air conditioning ● Sanitary ware / plumbing ● Fire protection system ● Building automation system
Contact Mr Erick Herlangga (Operational Director) 62 21 527 0215 f 62 21 527 0216 Email:
[email protected] Website: www.goldentulip.com/id/asia-and-pacific/indonesia Menara Global Lantai 12, Jalan Jendral Gatot Subroto Kavling 27, Jakarta Selatan, 12950, Jakarta, Indonesia Architect Triputra Karya Agung PT - Bandung Contact Mr Deni Ishadinoto (Head of Planning Division) 62 22 8888 4145 / f 62 8888 4148 8888 4148 Jalan HMS Mitadiredja, Exit tol Baros 2, Cimahi, 40521, West Java, Indonesia
Estimated cost: Rp84.00 bn (US$6.22 mn). Construction is expected to start in early March 2016. Construction is expected to end in late December 2017. Pembangunan kondotel 15 lantai dan 2 level basement dengan luas bangunan sekitar 21.000 meter persegi. Perkiraan biaya : tidak dinyatakan. Konstruksi diharapkan mulai Maret 2016 dan selesai Desember 2017.
Contact Mr Eko Suwarno (Drafter) 62 22 8888 4145 / f 62 8888 4148 8888 4148 Jalan HMS Mitadiredja, Exit tol Baros 2, Cimahi, 40521, West Java, Indonesia
Developer Triputra Karya Agung PT - Head Office Contact Mr Adrianto Trisnadi (Director) 62 21 2903 9988 / f 62 21 2903 9983 2903 9984 Jalan Arjuna Utara, Kavling 16, Blok F, Ruko Office, Menara Apartment, Kebon Jeruk, Jakarta Barat, 10260, Jakarta, Indonesia
Structural Engineer Junaedi Masil & Associates Contact Mr Junaedi Masil (Director / Structural Engineer) 62 21 585 6244 f 62 21 585 6244 Email:
[email protected] Jalan Menara II No. 19, Meruya Selatan, Jakarta Barat, 11650, Jakarta, Indonesia
Contact Mr Darmawanto (Project Administration) 62 21 2903 9988 / f 62 21 2903 9983 2903 9984 Jalan Arjuna Utara, Kavling 16, Blok F, Ruko Office, Menara Apartment, Kebon Jeruk, Jakarta Barat, 10260, Jakarta, Indonesia
Mechanical & Electrical Consultant Policipta Multidesain PT Contact Mr Jajap Tanudjaja (Project Director) 62 21 5365 1481 / f 62 21 532 1385 5365 1525 Email:
[email protected] Jalan H. Domang No. 31 B, Kelapa Dua, Kebon Jeruk, Jakarta Barat, 11550, Jakarta, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
29
Sample Project of The Month PROJECT CATEGORY
Residential/ Hotel/ Recreation/ Car Park PREMIERE CLASSE CONDOTEL (3 STARS) (continued...)
PROJECT STAGE
PROJECT CODE
Documentation
111076002
PURI MENESA CONDOTEL Jalan Raya Dharmawangsa, Nusa Dua, Badung, Bali
Contact Mr Arya (Mechanical & Electrical Engineer) 62 21 5365 1481 / f 62 21 532 1385 5365 1525 Email:
[email protected] Jalan H. Domang No. 31 B, Kelapa Dua, Kebon Jeruk, Jakarta Barat, 11550, Jakarta, Indonesia
● ● ● ● ●
Construction Manager Dinamika Teknik Selaras PT Contact Mr Victor H Sianipar (Director) 62 21 4786 9373 f 62 21 4786 9372 Email:
[email protected] Jalan Ahmad Yani No. 2 Perkantoran Pulo Mas Gedung IV 2nd Floor # 6-7, Jakarta, 13220, Jakarta, Indonesia
4 storey condotel (approx 15,000 sq m) Up to 120 rooms Single basement levels car park Lobby & reception area Swimming pool
Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board ● Roofing : concrete roof tile ● Roof truss : lightweight steel ● Aluminium framed doors & windows/ solid wood doors ● Piling : mini pile / bored pile ● Lifts ● Split type air conditioning ● Sanitary ware / plumbing ● Building automation system
Piling Contractor To be appointed Contractor To be appointed
Estimated cost: undisclosed. Construction timetable is to be determined. Kondotel 4 lantai terdiri 120 kamar, dengan luas bangunan sekitar 15.000 meter persegi. Perkiraan biaya: tidak dinyatakan. Waktu konstruksi tidak ditentukan. Developer Citra Mutiara Bestari PT Contact Mr Harso Utomo Suwito (Director) 62 21 5826856 f 62 21 5826857 Kompleks Puri Niaga II, Jalan Puri Kencana J1 No. 2J, Jakarta, Jakarta, Indonesia Contact Mr Erik Setiawan (Architect - Project Division) 62 21 5826856 f 62 21 5826857 Kompleks Puri Niaga II, Jalan Puri Kencana J1 No. 2J, Jakarta, Jakarta, Indonesia Landscape Consultant Studio Hijau Lumut Contact Mr Jungyat (Landscape Designer) 62 361 366 6991 f 62 361 366 6991 Email:
[email protected] Website: www.shl.asia Jalan Sedap Malam Gang Pakis No. 14, Denpasar, 80237, Bali, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
30
Sample Project of The Month PROJECT CATEGORY
Residential PURI MENESA CONDOTEL (continued...)
Hotel Operator Metropolitan Golden Management PT MGM Centre Contact Mr Basari Bachri (Operational Director) 62 21 7581 8999 / 766 f 62 21 766 4922 4921 Email:
[email protected] Website: www.horisonhotels.com MGM Centre, Jalan Rumah Sakit Fatmawati Raya No. 100 F, Jakarta Selatan, 12430, Jakarta, Indonesia
PROJECT STAGE
PROJECT CODE
Documentation
143186002
ROYAL TAJUR BY RANCAMAYA - THE PROMINENCE CLUSTER PHASE I Jalan Raya Boulevard, Tajur, Bogor, West Java ●
12 x 3 storey residential houses (approx. 191 sq m each) ● Units to have 3 + 1 bedrooms ● Internal road network ● Gated entrance
Architect A2 Associates Architects Contact Mr Khoirul Ummam (Architect) 62 21 7279 0136 / 720 f 62 21 7279 6816 4938 / 7279 6816 Email:
[email protected] Ruko Duta Fatmawati Blok B2 No. 12, Jalan Fatmawati Raya No. 39, Jakarta Selatan, 12420, Jakarta, Indonesia
Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced construction ● Ceiling : gypsum board ● Roofing : concrete roof tile ● Roof truss : lightweight steel ● Aluminium framed doors & windows / solid wood doors ● Piling : mini pile ● Sanitary ware / plumbing
Contact Mr Agus Prihananto (Architect) 62 21 7279 0136 / 720 f 62 21 7279 6816 4938 / 7279 6816 Email:
[email protected] Ruko Duta Fatmawati Blok B2 No. 12, Jalan Fatmawati Raya No. 39, Jakarta Selatan, 12420, Jakarta, Indonesia
Estimated cost: undisclosed. Construction is expected to start in early April 2016. Construction is expected to end in late December 2016.
Structural Engineer To be appointed
Kawasan hunian terdiri dari 12 unit rumah 3 lantai, dengan masing - masing luas bangunan sekitar 191 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi dimulai April 2016 dan diharapkan selesai Desember 2016.
Mechanical & Electrical Engineer To be appointed Contractor To be appointed
Developer Tajur Surya Abadi PT ( member of Suryamas Dutamakmur Group) Contact Ms Riska (Project Administrator) 62 251 880 0123 / 880 f 62 251 880 0123/ 880 0234 0234 Website: www.royaltajur.com Jalan Raya Boulevard No.1, Tajur, Bogor, 16710, West Java, Indonesia Architect Suryamas Dutamakmur Tbk PT - Jakarta Contact Mr Ricky Eman Syafarius (Head of Planning Division) 62 21 5793 6733 f 62 21 5793 6730 Email:
[email protected] Sudirman Plaza Business Complex Plaza Marein, 16th floor Jalan Jend. Sudirman kav 76-78, Jakarta Selatan, 12910, Jakarta, Indonesia Engineer Tajur Surya Abadi PT ( member of Suryamas Dutamakmur Group) Contact Mr Rian Reza (Architect & Engineer) 62 251 880 0123 / 880 f 62 251 880 0123/ 880 0234 0234 Website: www.royaltajur.com Jalan Raya Boulevard No.1, Tajur, Bogor, 16710, West Java, Indonesia Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
31
Sample Project of The Month PROJECT CATEGORY
Health ROYAL TAJUR BY RANCAMAYA - THE PROMINENCE CLUSTER PHASE I (continued...)
PROJECT STAGE
PROJECT CODE
Documentation
137035002
RSUD PROPINSI SULAWESI BARAT (TYPE B) Jalan R. E. Marthadinata, Mamuju, West Sulawesi
Earthworks Contractor Bumi Casa Manggala Utama PT Contact Mr Rio Agustinus (Project Director) 62 21 538 8343 f 62 21 538 8343 Email:
[email protected] Jalan Gunung Rinjani RE No 54, Sektor IV BSD Serpong, Tangerang, 15310, Jakarta, Indonesia
● ● ● ● ● ● ●
Contact Mr Furqon (Project Division Staff) 62 21 538 8343 f 62 21 538 8343 Email:
[email protected] Jalan Gunung Rinjani RE No 54, Sektor IV BSD Serpong, Tangerang, 15310, Jakarta, Indonesia
4 x 3 storey hospital buildings (approx 17,500 sq m) Medical consulting rooms Patient medical record room Patient recovery rooms Registration area & waiting room Observation room Pharmacy room
Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board / fibre cement board ● Walling : light brick walls ● Facade : glass wall cladding ● Roofing : concrete slab roof ● Roof truss : steel frame ● Aluminium framed doors & windows / fabricated wood doors ● Piling : mini pile ● Lifts ● Sanitary ware / plumbing
Contact Ms Mervin Oktaviana (Purchasing Staff) 62 21 538 8343 f 62 21 538 8343 Email:
[email protected] Jalan Gunung Rinjani RE No 54, Sektor IV BSD Serpong, Tangerang, 15310, Jakarta, Indonesia Contractor To be appointed
Estimated cost: undisclosed. Construction is expected to start in early August 2016. Construction is expected to end in late December 2017. Pembangunan 4 gedung rumah sakit 3 lantai dengan total luas bangunan sekitar 17.500 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Agustus 2016 dan selesai Desember 2017. Developer Rumah Sakit Umum Daerah (RSUD) Propinsi Sulawesi Barat Contact Mr Andi Munatsir (Project Coordinator) 62 426 270 3259 f 62 426 22320 Jalan R. E. Marthadinata, Mamuju, 91511, West Sulawesi, Indonesia Supervisory Consultant To be appointed Feasibility Consultant Dinamika Raya CV Contact Mr Muhammad Zuhri (Director - Project Manager) 62 31 829 2043 f 62 31 829 2043 Email:
[email protected] Jalan Ketintang Baru II Kavling 45, Surabaya, 60231, East Java, Indonesia Contact Mr Agung Setyawan (Team Leader) 62 31 829 2043 f 62 31 829 2043 Email:
[email protected] Jalan Ketintang Baru II Kavling 45, Surabaya, 60231, East Java, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
32
Sample Project of The Month PROJECT CATEGORY
Health/ Car Park RSUD PROPINSI SULAWESI BARAT (TYPE B) (continued...)
PROJECT STAGE
PROJECT CODE
Documentation
143254002
UNGGUL KARSA MEDIKA HOSPITAL Taman Kopo Indah III, Bandung, West Java
Architect Rancang Persada PT Contact Mr Agung Setiawan, ST (Director) 62 31 829 2044 f 62 31 829 2044 Email:
[email protected] Jalan Krukah Selatan No. 110, Ngagel Rejo, Wonokromo, Surabaya, 60245, East Java, Indonesia
● ● ● ● ● ● ● ● ● ● ● ● ● ● ●
Contact Mr Achmad Ismangil (Architect) 62 31 829 2044 f 62 31 829 2044 Email:
[email protected] Jalan Krukah Selatan No. 110, Ngagel Rejo, Wonokromo, Surabaya, 60245, East Java, Indonesia Construction Manager Delta Buana PT Contact Mr Ir. Ahmad Kusaeri (Director) 62 31 829 3425 / 829 f 62 31 829 3425 / 829 2043 7261 Email:
[email protected] Jalan Krukah Selatan No. 98, Ngagelrejo, Wonokromo, Surabaya, 60245, East Java, Indonesia
4 storey hospital (approx 24,122 sq m) Inpatient care unit (182 beds) Emergency unit Polyclinic unit Surgical unit Medical laboratory Medical consulting rooms Patient medical record room Patient recovery rooms Obstetrics & gynecology unit Registration area & waiting room Observation room Pharmacy room Medical equipment storage room At grade car park
Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : light brick walls ● Facade : glass wall cladding / aluminium composite cladding ● Roofing : concrete slab roof ● Aluminium framed doors & windows / fabricated wood doors / UPVC framed doors & windows ● Piling : bored pile ● Lifts ● Split type air conditioning ● Fire protection system ● Sanitary ware / plumbing ● Building automation system
Contact Ms Atik Ragil Saputry (Administration Staff) 62 31 829 3425 / 829 f 62 31 829 3425 / 829 2043 7261 Email:
[email protected] Jalan Krukah Selatan No. 98, Ngagelrejo, Wonokromo, Surabaya, 60245, East Java, Indonesia Contractor To be appointed
Estimated cost: undisclosed. Construction is expected to start in early June 2016. Construction is expected to end in late December 2017. Bangunan rumah sakit 4 lantai, dengan luas bangunan sekitar 24.122 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Juni 2016 dan selesai Desember 2017. Developer Yayasan Maranatha Bandung Contact Mr Beng Sugiharto (Ketua Yayasan) 62 22 201 2186 / 200 f 62 22 200 7916 7916 Email:
[email protected] Website: www.maranatha.edu Jalan Prof. drg. Surya Sumantri No. 65, Bandung, 40164, West Java, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
33
Sample Project of The Month PROJECT CATEGORY
Residential/ Retail/ Recreation UNGGUL KARSA MEDIKA HOSPITAL (continued...)
PROJECT STAGE
PROJECT CODE
Documentation
136594002
WONDERLAND APARTMENT - TOWER 1 Jalan Sersan Bajuri Km. 3,8, Bandung, West Java
Contact Ms Cindy (Administrator / General Staff) 62 22 201 2186 / 200 f 62 22 200 7916 7916 Email:
[email protected] Website: www.maranatha.edu Jalan Prof. drg. Surya Sumantri No. 65, Bandung, 40164, West Java, Indonesia
● ●
26 storey apartment tower (approx 34,384 sq m) Studio type apartments, single bedroom units & 2 bedroom units ● Apartment lobby & reception lounge ● Ground floor retail shops & restaurants ● Swimming pool
Architect Global Rancang Selaras PT Contact Mr Adi Utomo Hatmoko (Principal Architect) 62 274 880 637 f 62 274 887 778 Email:
[email protected] Website: www.globalrancangselaras.com Jalan Apel No. 111, Nglaban, Ngaglik, Sleman, 55281, DI Yogyakarta, Indonesia
Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : precast concrete panels / light brick wall ● Facade : glass wall cladding ● Roofing : concrete roof tile / concrete slab roof ● Aluminium framed doors & windows / fabricated wood doors ● Piling : mini pile / bored pile ● Lifts ● Sanitary ware / plumbing ● Fire protection system ● Security system ● Building automation system
Contact Mr Mario Andreti (Project Architect & Construction Manager) 62 274 880 637 f 62 274 887 778 Email:
[email protected] Website: www.globalrancangselaras.com Jalan Apel No. 111, Nglaban, Ngaglik, Sleman, 55281, DI Yogyakarta, Indonesia Structural Engineer Anugrah Multi Cipta Karya PT Bandung Contact Mr Natan Madutujuh (Director / Project Coordinator) 62 22 604 1685 f 62 22 600 3595 Email:
[email protected] Jalan Situ Aksan No. 29, Bandung, 40182, West Java, Indonesia
Estimated cost: Rp171.92 bn (US$12.44 mn). Construction is expected to start in early June 2016. Construction is expected to end in late December 2018. Apartemen 26 lantai dengan luas bangunan sekitar 34.384 meter persegi. Perkiraan biaya: Rp 171,92 milyar. Konstruksi diharapkan mulai Juni 2016 dan selesai Desember 2018.
Contact Mr Daud (Project Manager) 62 22 604 1685 f 62 22 600 3595 Email:
[email protected] Jalan Situ Aksan No. 29, Bandung, 40182, West Java, Indonesia
Developer Kurnia Cipta Wahana PT (aka Wisata Kampung Gajah Wonderland) Contact Mr Jeffry Kurniawan (Director / Owner) 62 22 8888 4011 / f Not available 8888 4012 Email:
[email protected] Website: www.kampunggajah.com Jalan Sersan Bajuri Km. 3,8, Bandung, 40154, West Java, Indonesia
Mechanical & Electrical Engineer Malmass Mitra Teknik (Matrik) PT Contact Mr Mas'ud Dohim (Project Director) 62 21 799 4609 / 798 f 62 21 799 3093 9775 Email:
[email protected] Website: www.malmass.co.id Jalan Rawajati Barat II No. 33, Kalibata, Jakarta Selatan, 12750, Jakarta, Indonesia
Architect Farchitect PT Contact Mr Fardian Susanto (Director / Architect) 62 22 5441 0406 f 62 22 5441 0406 Email:
[email protected] Website: www.farchitect.com Jalan Kuta Maya No. 8, Kompleks Singgasana Pradana, Bandung, 40236, West Java, Indonesia
Piling Contractor To be appointed Contractor To be appointed
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
34
Sample Project of The Month PROJECT CATEGORY
Infrastructure WONDERLAND APARTMENT - TOWER 1 (continued...)
PROJECT STAGE
PROJECT CODE
Post tender Contact Mr Erik Setiawan (Project Manager) 62 22 5441 0406 f 62 22 5441 0406 Email:
[email protected] Website: www.farchitect.com Jalan Kuta Maya No. 8, Kompleks Singgasana Pradana, Bandung, 40236, West Java, Indonesia
145435002
BANJAR CAHYANA IRRIGATION SYSTEM KABUPATEN BANJARNEGARA Banjar Cahyana, Kelurahan Rejasa, Madukara, Banjarnegara, Central Java ● ● ● ● ●
Structural Engineer Anugrah Multi Cipta Karya PT Bandung Contact Mr Natan Madutujuh (Director / Project Coordinator) 62 22 604 1685 f 62 22 600 3595 Email:
[email protected] Jalan Situ Aksan No. 29, Bandung, 40182, West Java, Indonesia
Irrigation system (covering of 500 ha) Primary irrigation channel Secondary irrigation channel Water control & irrigation gates Civil works
Estimated cost: Rp5.49 bn (US$0.40 mn). Work is expected to start in early April 2016. Work is expected to end in early December 2016.
Mechanical & Electrical Engineer To be appointed
Jaringan irigasi dengan cakupan seluas 500 hektar, saluran irigasi primer, saluran irigasi sekunder, pengontrol air dan pintu irigasi dan pekerjaan sipil terkait. Perkiraan biaya: Rp 5,49 milyar. Pekerjaan diharapkan mulai April 2016 dan selesai Desember 2016.
Piling Contractor To be appointed Contractor To be appointed
Government Implementing Agency Kementerian Pekerjaan Umum dan Perumahan Rakyat - Direktorat Jenderal Sumber Daya Air Propinsi DI Yogyakarta - Satuan Non Vertikal Tertentu Pelaksanaan Jaringan Pemanfaatan Air Serayu - Opak Contact Mr Ir. Singgih Nurcahya, Sp.1 (Project Coordinator - SNVT PJPA Serayu - Opak) 62 274 446 2838 f 62 274 446 2838 Website: www.pu.go.id Jalan Solo Km.6, Sleman, 55281, DI Yogyakarta, Indonesia Contact Mr Antyarsa Ikanadani, ST. M.Eng (Project Coordinator - PPK Irigasi dan Rawa I) 62 274 446 2838 f 62 274 446 2838 Website: www.pu.go.id Jalan Solo Km.6, Sleman, 55281, DI Yogyakarta, Indonesia Kementerian Pekerjaan Umum dan Perumahan Rakyat Direktorat Jenderal Sumber Daya Air Propinsi DI Yogyakarta Balai Besar Wilayah Sungai Serayu Opak Contact Mr Ir. Tri Bayu Adji, MA (Project Manager- BBWS Serayu Opak) 62 274 489 172 f 62 274 489 552 Jalan Solo Km. 6, Yogyakarta, 55281, DI Yogyakarta, Indonesia Contact Mr Untung Samiaji, Dipl.ATP (Project Coordinator - PPK Perencanaan dan Program) 62 274 489 172 f 62 274 489 552 Jalan Solo Km. 6, Yogyakarta, 55281, DI Yogyakarta, Indonesia Supervisory Consultant To be appointed
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
35
Sample Project of The Month PROJECT CATEGORY
Industrial BANJAR CAHYANA IRRIGATION SYSTEM KABUPATEN BANJARNEGARA (continued...)
PROJECT STAGE
Post tender
PROJECT CODE
144319002
COMBIPHAR DONGA INDONESIA BIOSIMILAR FACTORY Jalan Raya Science Boulevard, Jaya Mukti Cikarang, Kawasan Industri Jababeka 5, Bekasi, Jakarta
Civil Engineer Putra Pertiwi Perkasa PT / Cahaya Persada CV Contact Mr Muhammad Rohim (Director - Senior Engineer) 62 24 671 0387 f 62 24 671 0387 Email:
[email protected] Jalan Mahesa Raya No. 409, Semarang, 50192, Central Java, Indonesia
●
2 storey biosimilar pharmacy factory (approx. 4,400 sq m) ● Production lines ● Quality control room ● Storage area
Contact Mr Mulyadi (Engineer) 62 24 671 0387 f 62 24 671 0387 Email:
[email protected] Jalan Mahesa Raya No. 409, Semarang, 50192, Central Java, Indonesia
Building elements include : ● Flooring : ceramic tile / epoxy flooring ● Structural : steel construction ● Ceiling : gypsum board / metal ceiling ● Walling : light brick walls / metal walling ● Facade : metal panel cladding ● Roofing : metal sheet roof ● Roof truss : steel frame ● Aluminium framed doors & windows / metal doors ● Fire protection system ● Security system
Tender Office Kementerian Pekerjaan Umum dan Perumahan Rakyat - Direktorat Jenderal Sumber Daya Air Propinsi DI Yogyakarta - Balai Besar Wilayah Sungai Serayu Opak Contact Ms Ir. Tuti Sutiarsih, MT (Secretary of BBWS Member of Tender Committee) 62 274 489 172 f 62 274 489 552 Jalan Solo Km. 6, Yogyakarta, 55281, DI Yogyakarta, Indonesia
Estimated cost: undisclosed.
Contractor To be appointed Remarks: Administrative & technical evaluation in progress.
Construction is expected to start in early February 2016. Construction is expected to end in late October 2016. Pabrik obat 2 lantai dengan luas bangunan sekitar 4.400 meter persegi. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Februari 2016 dan selesai Oktober 2016. Developer Combiphar Donga Indonesia PT Contact Mr Raymond (Project Manager) 62 21 2933 3031 f 62 21 2933 3053 Website: www.combiphar.com Office 8 Building 26th Floor Jalan Jendral Sudirman Kavling 52-53 Sudirman Central Business District (SCBD) Lot. 28, Jakarta Selatan, 12190, Jakarta, Indonesia Contact Mr Ucok Tendi (Project Manager) 62 21 2933 3031 f 62 21 2933 3053 Email:
[email protected] Website: www.combiphar.com Office 8 Building 26th Floor Jalan Jendral Sudirman Kavling 52-53 Sudirman Central Business District (SCBD) Lot. 28, Jakarta Selatan, 12190, Jakarta, Indonesia Architect U-IL architect & engineer Contact Undisclosed 82 2 3484 8700 f 82 2 3484 8710 Website: www.u-il.com Geopyeong Town Building 2F 139, Bongeunsa-ro, Gangnam-gu, Seoul 06121, South Korea
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
36
Sample Project of The Month PROJECT CATEGORY
Industrial COMBIPHAR DONGA INDONESIA BIOSIMILAR FACTORY (continued...)
PROJECT STAGE
PROJECT CODE
Post tender
144299002
INDONUSA AGROMULIA CPO FACTORY - MUSI BANYUASIN Kebun Air Tenggulang, Kecamatan Sungai Lilin, Musi Banyuasin, South Sumatera
Construction Manager TeamworX Indonesia PT Contact Undisclosed 62 21 780 0940 f 62 21 789 2151 Email:
[email protected] Website: www.teamworx.co.id Beltway Office Park, Building C, Ground floor Jalan T.B. Simatupang No. 41, Cilandak, Jakarta Selatan, 12550, Jakarta, Indonesia
● ● ● ●
Piling Contractor To be appointed
Crude palm oil plant (capacity of 60 tph) Mechanical work Conveyor lines Workshop
Building elements include: ● Flooring : hardened floor ● Structural : steel construction ● Ceiling : metal ceiling ● Walling : metal walling ● Roofing : metal sheet roofing ● Roof truss : steel frame ● Fire protection system ● Security system ● Aluminium framed doors / folding gates
Contractor To be appointed Bidders include: Taiyo Sinar Raya Teknik PT - Cibitung Contact Mr Hikmah D. (Section Head of Purchasing Division - Civil) 62 21 8832 9435 f 62 21 8832 9439 / 8832 0959 Email:
[email protected] Website: www.taiyosinar.com Jalan K.H. Noer Alie RT 007 / RW 003, Desa Cibuntu, Cibitung, Bekasi, 17520, West Java, Indonesia
Estimated cost: undisclosed. Construction started in early January 2016. Construction is expected to end in early March 2017.
Citra Karsa Dinamika PT Contact Mr Kuncoro (Supervisor of Purchasing and Logistic Division) 62 21 8261 0121 f 62 21 8261 0120 Email:
[email protected] Website: www.citrakd.com Jalan Pangkalan II No. 36 RT 04 / RW 02 Cikiwul, Bantar Gebang, Sebelah Pasar Bantar Gebang, Bekasi, 17310, West Java, Indonesia
Pabrik pengolahan kelapa sawit dengan kapasitas produksi 60 ton buah tandan segar per jam. Perkiraan biaya: tidak dinyatakan. Konstruksi diharapkan mulai Januari 2016 dan selesai Maret 2017. Developer Indonusa Agromulia PT - Head Office Contact Mr Bagus Setiawan (Manager of Engineering Division) 62 21 8378 0791 f 62 21 8378 0792 Email:
[email protected] Website: www.indonusaagromulia.com Gedung Permata Kuningan lantai 19, Jalan Kuningan Mulia Kavling 9C, Kelurahan Setiabudi, Jakarta Selatan, 12980, Jakarta, Indonesia
Nusa Raya Cipta Tbk PT - Head Office Contact Mr Tjoe Pardal (Estimator Manager) 62 21 819 3526 / 819 f 62 21 819 3471 / 819 3508 3544 Email:
[email protected] Website: www.nusarayacipta.com Gedung Graha Cipta, Jalan D.I. Panjaitan No. 40, Jakarta Timur, 13350, Jakarta, Indonesia
Contact Mr Haris Munandar (Manager of Procurement Division) 62 21 8378 0791 f 62 21 8378 0792 Website: www.indonusaagromulia.com Gedung Permata Kuningan lantai 19, Jalan Kuningan Mulia Kavling 9C, Kelurahan Setiabudi, Jakarta Selatan, 12980, Jakarta, Indonesia
Harjaguna Kurniamitra PT Contact Mr Darman (Estimator) 62 21 452 8415 / 452 f 62 21 453 2983 0976 / 451 3791 Email:
[email protected] Website: www.harjaguna.com Kelapa Gading Bukit Indah Jalan Gading Bukit Raya Blok K 02-03, Jakarta Utara, 14240, Jakarta, Indonesia
Tender Office Indonusa Agromulia PT - Head Office Contact Mr Bagus Setiawan (Manager of Engineering Division) 62 21 8378 0791 f 62 21 8378 0792 Email:
[email protected] Website: www.indonusaagromulia.com Gedung Permata Kuningan lantai 19, Jalan Kuningan Mulia Kavling 9C, Kelurahan Setiabudi, Jakarta Selatan, 12980, Jakarta, Indonesia
Mechanical & Electrical Sub-Contractor To be appointed
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
37
Sample Project of The Month PROJECT CATEGORY
Office INDONUSA AGROMULIA CPO FACTORY - MUSI BANYUASIN (continued...)
PROJECT STAGE
Post tender
PROJECT CODE
132072002
KANTOR PELAYANAN PAJAK (KPP) PRATAMA PRABUMULIH (PHASE 1) Jalan Jendral Sudirman No. 19, Prabumulih, South Sumatera
EPC Contractor To be appointed Remarks: Administrative & technical evaluation in progress
● ● ● ●
3 storey tax office building (approx. 5,100 sq m) Work stations & office space Public service counters Waiting room
Building elements include: ● Flooring : ceramic tile ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : light brick walls ● Roofing : concrete roof tile ● Roof truss : lightweight steel ● Aluminium framed doors & windows / fabricated wood doors Estimated cost: Rp28.68 bn (US$2.08 mn). Construction is expected to start in early February 2016. Construction is expected to end in late June 2016. Bangunan kantor pajak 3 lantai dengan luas bangunan sekitar 5.100 meter persegi. Perkiraan biaya: Rp 28,68 milyar. Konstruksi diharapkan mulai Februari 2016 dan selesai Juni 2016. Government Implementing Agency Kantor Pelayanan Pajak (KPP) Pratama Kota Prabumulih Contact Mr Ramdanu Martis (Head Officer) 62 713 323 611 f 62 713 323 188 Jalan Jendral Sudirman No. 19, Prabumulih, 31121, South Sumatera, Indonesia Contact Mr Isanul Akbar (Kepala Bagian Umum - Project Coordinator) 62 713 323 611 f 62 713 323 188 Jalan Jendral Sudirman No. 19, Prabumulih, 31121, South Sumatera, Indonesia Supervisory Consultant To be appointed Remarks: The tenderers are listed in alphabetical order. Bidders include: Abdi Kriasy Konsultant CV Contact Mr Said Hadi (Director - Project Coordinator) 62 61 820 1249 f 62 61 820 1249 Email:
[email protected] Jalan Setiabudi No. 11 B, Kelurahan Tanjung Rejo, Kecamatan Medan Sunggal, Medan, 20122, North Sumatera, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
38
Sample Project of The Month KANTOR PELAYANAN PAJAK (KPP) PRATAMA PRABUMULIH (PHASE 1) (continued...)
KANTOR PELAYANAN PAJAK (KPP) PRATAMA PRABUMULIH (PHASE 1) (continued...)
Detail Merbang Seulawah CV Contact Undisclosed Not available f Not available Jalan Sukabangun I No. 160 A RT 022 / RW 003, Kelurahan Sukabangun, Kecamatan Sukarami, Palembang, 30151, South Sumatera, Indonesia (For enquiry, please contact by Mail.)
Tender Office Kantor Pelayanan Pajak (KPP) Pratama Kota Prabumulih Contact Ms Kana (Secretary of Tender Committee) 62 713 323 611 f 62 713 323 188 Jalan Jendral Sudirman No. 19, Prabumulih, 31121, South Sumatera, Indonesia Contractor To be appointed Remarks: The tenderers are listed in bid price order. Lowest bidders are:
Khalimal Consultant CV Contact Mr Afandi Amran (Director - Architect) 62 61 847 0986 f 62 61 847 0986 Email:
[email protected] Komplek Pondok Surya Blok VI No. 225, Kelurahan Helvetia Timur, Kecamatan Medan Helvetia, Medan, 20124, North Sumatera, Indonesia
Mitra Gusnita Nanda PT (bids: Rp26,424 mn) Contact Mr Tandanan Daulay (Director) 62 21 870 1390 f 62 21 877 2168 Email:
[email protected] Jalan Sawo Indah No. 24, Kelurahan Baru Cijantung III, Kcamatan Pasar Baru, Jakarta Timur, 13780, Jakarta, Indonesia
Kingstom Tekniktama CV Contact Mr Tommy Bokings (Director) 62 435 829 261 f Not available Email:
[email protected] Jalan Kijang No.186 Kelurahan Tanggilingo Kecamatan Kabila, Bone Bolango, 96583, Gorontalo, Indonesia
Andi Syam Putra Perkasa PT (bids: Rp27,765 mn) Contact Mr Iswahyudi (Project Director) 62 21 438 00281 f 62 21 438 00281 Jalan Bugis No. 124, Kelurahan Kebon Bawang, Kecamatan Tanjung Priok, Jakarta Utara, 14270, Jakarta, Indonesia
Rancang Bangun Consultant CV Contact Mr Bangun Pasaribu (Director) 62 61 786 3706 f 62 61 786 3706 Email:
[email protected] Jalan Turi, Gang Salim No. 22, Timbang Deli, Medan Amplas, Medan, 20148, North Sumatera, Indonesia
Sejahtera Intercon PT (bids: Rp28,575 mn) Contact Mr Idrus (Director) 62 711 310 884 f 62 711 311 483 Email:
[email protected] Jalan Veteran No. 7093 C / A, Kelurahan 20 Ilir I, Kecamatan Ilir Timur I, Palembang, 30126, South Sumatera, Indonesia
Architect Gubahlaras Arsitek dan Perencana PT Contact Mr Bambang Hudiyanto (Director - Principal Architect) 62 21 781 5281 / 781 f 62 21 781 5243 5249 Email:
[email protected] Website: www.gubahlaras.co.id Jalan Raya Jatipadang No. 63, Kelurahan Jatipadang, Kecamatan Pasar Minggu, Jakarta Selatan, 12540, Jakarta, Indonesia Contact Mr Agus Setyasaroso (Senior Architect) 62 21 781 5281 / 781 f 62 21 781 5243 5249 Email:
[email protected] Website: www.gubahlaras.co.id Jalan Raya Jatipadang No. 63, Kelurahan Jatipadang, Kecamatan Pasar Minggu, Jakarta Selatan, 12540, Jakarta, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
39
Sample Project of The Month PROJECT CATEGORY
Oil and Gas/ Infrastructure PROJECT STAGE
Post tender
LENGO GAS DEVELOPMENT PROJECT (continued...)
PROJECT CODE
144581002
LENGO GAS DEVELOPMENT PROJECT Bulu A Area, Bulu PSC, Offshore East Java, East Java ●
●
● ● ●
Conceptual Designer Remarks: Concept Development Study & RAM Study
Unmanned minimum facilities 4-leg / 8-wellslot fixed structure wellhead platform installation (water depth of 60 m) 66 km long of offshore / 7.8 km long of onshore & 20" OD carbon steel export pipeline to transport the gas to an onshore gas receiving facility Onshore Receiving Facility (ORF) completed with separated system, dehydration & metering sales Engineering, procurement & construction Tender Number : KE/BUL/15/0030
Synergy Engineering PT Contact Mrs Hasta Nurullita (Electrical Engineer) 62 21 5315 0464 / f 62 21 5315 0466 5315 0465 Email:
[email protected] Website: www.ptsynergy.co.id Nusa Loka, Blok C1 No. 03, Sektor XIV - 4, BSD City, Serpong, Tangerang Selatan, 15318, Banten, Indonesia Design Consultant Remarks: Front-End Engineering Design
Estimated cost: undisclosed.
Synergy Engineering PT Contact Mr Arwin (Project Engineer) 62 21 5315 0464 / f 62 21 5315 0466 5315 0465 Email:
[email protected] Website: www.ptsynergy.co.id Nusa Loka, Blok C1 No. 03, Sektor XIV - 4, BSD City, Serpong, Tangerang Selatan, 15318, Banten, Indonesia
Construction is expected to start in early September 2016. Construction is expected to end in early September 2018. Developer KrisEnergy Ltd. Contact Mr Kusmutarto Basuki (General Manager) 62 21 2934 2700 f 62 21 2934 2710 Website: www.krisenergy.com Talavera Office Park, 3rd Floor, Jalan Letjen T.B. Simatupang, Kavling 22-26, Cilandak, Jakarta Selatan, 12430, Jakarta, Indonesia
Contact Mr Lutfi Indra (Process Engineer) 62 21 5315 0464 / f 62 21 5315 0466 5315 0465 Email:
[email protected] Website: www.ptsynergy.co.id Nusa Loka, Blok C1 No. 03, Sektor XIV - 4, BSD City, Serpong, Tangerang Selatan, 15318, Banten, Indonesia
Contact Mrs Ratih Hupudio (Senior Commercial Manager) 62 21 2934 2700 f 62 21 2934 2710 Website: www.krisenergy.com Talavera Office Park, 3rd Floor, Jalan Letjen T.B. Simatupang, Kavling 22-26, Cilandak, Jakarta Selatan, 12430, Jakarta, Indonesia
Pre-Qualification Office KrisEnergy Ltd. Contact Mr Andi (Staff of Procurement Division) 62 21 2934 2700 f 62 21 2934 2710 Website: www.krisenergy.com Talavera Office Park, 3rd Floor, Jalan Letjen T.B. Simatupang, Kavling 22-26, Cilandak, Jakarta Selatan, 12430, Jakarta, Indonesia
Contact Mr Neil Maclean (Project Manager) 62 21 2934 2700 f 62 21 2934 2710 Website: www.krisenergy.com Talavera Office Park, 3rd Floor, Jalan Letjen T.B. Simatupang, Kavling 22-26, Cilandak, Jakarta Selatan, 12430, Jakarta, Indonesia
EPC Contractor To be appointed Remarks: Qualification : Non small scale business. Qualification method : Pre-qualification. Classification : 01.d.01.02 Production facility of oil, gas & energy
Surveyor Remarks: Geophysical & Geotechnical Surveys Offshore Works Indonesia PT Contact Mr Faisal (Geophysicist) 62 21 722 1690 f 62 21 722 5454 Email:
[email protected] Website: www.javaoffshore.com Jalan Mahakam 1 No. 11B, Kramat Pela, Kebayoran Baru, Jakarta Selatan, 12130, Jakarta, Indonesia
Tender opens on 05 January, 2016 and closes on 08 January, 2016.
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
40
Sample Project of The Month PROJECT CATEGORY
PROJECT CATEGORY
Infrastructure
Transport/ Infrastructure/ Retail/ Car Park
PROJECT STAGE
PROJECT CODE
Post tender
PROJECT STAGE
144674002
Post tender
MAKASSAR NEW PORT (PHASE B) Jalan Pelabuhan, Makassar, South Sulawesi ● ● ● ● ● ● ●
PROJECT CODE
144680002
NUNUKAN SEAPORT - PASSENGER TERMINAL Jalan Pelabuhan Baru, Nunukan, North Kalimantan ●
Breakwater construct (approx. 350 m length) Road construct (approx. 8,000 m length x 18 m width) Hotmix asphalt overlay Rock revetment wall Tetrahedral concrete structure Reclamation work Civil works
3 storey domestic passenger terminal (approx 10,000 sq m) ● Ticketing hall ● Commercial & retail area ● At grade car park Building elements include: ● Flooring : ceramic tile / homogeneous tile ● Structural : reinforced concrete ● Ceiling : gypsum board / decorative ceiling ● Walling : light brick walls / precast concrete panels ● Facade : glass wall cladding / aluminium composite cladding ● Roofing : concrete slab roof / metal sheet roofing ● Roof truss : steel frame ● Aluminium framed doors & windows / fabricated wood doors ● Lifts / escalators ● Duct connected air conditioning ● Fire protection system / security system ● Sanitary ware / plumbing ● Building automation system
Estimated cost: Rp1280.00 bn (US$92.65 mn). Work is expected to start in early May 2016. Work is expected to end in late December 2016. Pekerjaan pelabuhan meliputi reklamasi, akses jalan ke lapangan penumpukan, pengerukan dan pemecah gelombang sepanjang 350 meter dan pekerjaan sipil terkait. Perkiraan biaya: Rp 1,28 trilyun. Pekerjaan diharapkan mulai Mei 2016 dan selesai Desember 2018. Developer Pelabuhan Indonesia IV (Persero) PT Contact Mr Doso Agung (President Director) 62 411 361 6549 ext. f 62 411 361 9044 1008 Email:
[email protected] Website: www.inaport4.co.id Jalan Soekarno No. 1, Makassar, 90173, South Sulawesi, Indonesia
Estimated cost: Rp110.00 bn (US$7.96 mn). Construction started in late December 2015. Construction is expected to end in late October 2017.
Supervisory Consultant To be appointed
Bangunan terminal penumpang 3 lantai, dengan luas bangunan sekitar 10.000 meter persegi. Perkiraan biaya: Rp 110,00 milyar. Konstruksi diharapkan mulai Desember 2015 dan selesai Oktober 2017.
Tender Office Pelabuhan Indonesia IV (Persero) PT Contact Mr Bambang Warsito (Head of Tender Committee) 62 411 361 6549 ext. f 62 411 361 9044 1008 Email:
[email protected] Website: www.inaport4.co.id Jalan Soekarno No. 1, Makassar, 90173, South Sulawesi, Indonesia
Developer Pelabuhan Indonesia IV (Persero) PT Contact Mr Doso Agung (President Director) 62 411 361 6549 ext. f 62 411 361 9044 1008 Email:
[email protected] Website: www.inaport4.co.id Jalan Soekarno No. 1, Makassar, 90173, South Sulawesi, Indonesia
Contact Ms Fitri (Logistics Division Staff) 62 411 361 6549 ext. f 62 411 361 9044 1008 Email:
[email protected] Website: www.inaport4.co.id Jalan Soekarno No. 1, Makassar, 90173, South Sulawesi, Indonesia
Pelabuhan Indonesia IV (Persero) PT - Nunukan Contact Mr Marihot Sigala (Operational Manager) 62 556 214 95 f 62 556 210 77 Jalan Pelabuhan Baru No. 10, Nunukan, 77182, North Kalimantan, Indonesia (For enquiry, please contact by Mail.)
Contractor To be appointed Remarks: Qualification : Non small scale business. Qualification method : Pre-qualification.
Supervisory Consultant To be appointed
Tender opens on 16 December, 2015 and closes on 31 December, 2015.
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
41
Sample Project of The Month PROJECT CATEGORY
Transport/ Retail NUNUKAN SEAPORT - PASSENGER TERMINAL (continued...)
PROJECT STAGE
Post tender
PROJECT CODE
132307002
RADIN INTEN II AIRPORT - PASSENGER TERMINAL Jalan H. Alamsyah Ratu Prawira Negara Km 28 Branti Raya, Kecamatan Natar, Bandar Lampung, Lampung
Tender Office Pelabuhan Indonesia IV (Persero) PT Contact Mr Bambang Warsito (Head of Tender Committee) 62 411 361 6549 ext. f 62 411 361 9044 1008 Email:
[email protected] Website: www.inaport4.co.id Jalan Soekarno No. 1, Makassar, 90173, South Sulawesi, Indonesia
●
2 storey domestic passenger terminal (approx. 15,000 sq m) ● Check-in hall with 6 counters ● Waiting lounge ● Commercial & retail area
Contact Ms Fitri (Logistics Division Staff) 62 411 361 6549 ext. f 62 411 361 9044 1008 Email:
[email protected] Website: www.inaport4.co.id Jalan Soekarno No. 1, Makassar, 90173, South Sulawesi, Indonesia (For enquiry, please contact by Mail.)
Building elements include: ● Flooring : ceramic tile ● Structural : reinforced concrete ● Ceiling : gypsum board ● Walling : light brick walls ● Roofing : concrete roof tile ● Roof truss : steel frame ● Aluminium framed doors & windows / solid wood doors
Contractor To be appointed Remarks: Qualification : Non small scale business. Qualification method : Pre-qualification.
Estimated cost: Rp99.70 bn (US$7.22 mn).
Tender opens on 17 December, 2015 and closes on 31 December, 2015.
Construction is expected to start in late January 2016. Construction is expected to end in late October 2016. Pembangunan terminal penumpang 2 lantai dengan luas bangunan sekitar 15.000 meter persegi. Perkiraan biaya: Rp 99,70 milyar. Konstruksi diharapkan mulai Januari 2016 dan selesai Oktober 2016. Government Implementing Agency Dinas Perhubungan Propinsi Lampung Contact Mr Albar Hasan Tanjung (Head Officer) 62 721 470 209 f 62 721 470 210 Website: www.dishub.lampungprov.go.id Jalan Cut Mutia No. 76, Teluk Betung, Bandar Lampung, 35214, Lampung, Indonesia Contact Mr Bambang Subogo (Head of Air Transportation Sub Division) 62 721 470 209 f 62 721 470 210 Website: www.dishub.lampungprov.go.id Jalan Cut Mutia No. 76, Teluk Betung, Bandar Lampung, 35214, Lampung, Indonesia Developer Kantor Pengelola Bandar Udara Radin Inten II Contact Mr Satimin (Head Officer) 62 721 769 7114 f 62 721 769 7115 Bandar Udara Radin Inten II, Jalan H. Alamsyah Ratu Prawira Negara Km 28 Branti Raya, Kecamatan Natar, Bandar Lampung, 35362, Lampung, Indonesia Contact Mr Muhammad Yamin (PPK - Project Coordinator) 62 721 769 7114 f 62 721 769 7115 Bandar Udara Radin Inten II, Jalan H. Alamsyah Ratu Prawira Negara Km 28 Branti Raya, Kecamatan Natar, Bandar Lampung, 35362, Lampung, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
42
Sample Project of The Month RADIN INTEN II AIRPORT - PASSENGER TERMINAL (continued...)
RADIN INTEN II AIRPORT - PASSENGER TERMINAL (continued...)
Contact Ms Rahayu (General Division Staff) 62 721 769 7114 f 62 721 769 7115 Bandar Udara Radin Inten II, Jalan H. Alamsyah Ratu Prawira Negara Km 28 Branti Raya, Kecamatan Natar, Bandar Lampung, 35362, Lampung, Indonesia
Tender Office Kantor Pengelola Bandar Udara Radin Inten II Contact Mr Didi Santoso (Head of Tender Committee) 62 721 769 7114 f 62 721 769 7115 Bandar Udara Radin Inten II, Jalan H. Alamsyah Ratu Prawira Negara Km 28 Branti Raya, Kecamatan Natar, Bandar Lampung, 35362, Lampung, Indonesia
Supervisory Consultant To be appointed Remarks: Administrative & technical evaluation in progress.
Contractor To be appointed Bidders include:
Environmental Impact Assessment Gelar Buana Semesta PT Contact Mr Ardi Efendi Saleh (Director) Not available f Not available Email:
[email protected] Jalan Mentor No. 62, Sukaraja, Bandung, 40172, West Java, Indonesia
Pembangunan Perumahan (Persero) Tbk PT - Jakarta Contact Mr Ir. Ketut Darmawan (Operational Director) 62 21 840 3883 f 62 21 840 3936 / 841 3890 Email:
[email protected] Website: www.pt-pp.com Plaza PP - Wisma Subiyanto, Jalan Letjen T.B. Simatupang No. 57, Pasar Rebo, Jakarta Timur, 13760, Jakarta, Indonesia
Contact Mr Achmad Ridwan (Project Coordinator) Not available f Not available Email:
[email protected] Jalan Mentor No. 62, Sukaraja, Bandung, 40172, West Java, Indonesia Master Planner Akbar Jaya Consultant PT Contact Mr Mulyono ST MT (Director - Project Coordinator) 62 721 261 118 / 769 f Not available 1142 Email:
[email protected] Perum Bumi Puspa Kencana Blok EE No. 14, Gedong Meneng, Bandar Lampung, 35213, Lampung, Indonesia Contact Mr Suharyanto (Project Coordinator) 62 721 261 118 / 769 f Not available 1142 Email:
[email protected] Perum Bumi Puspa Kencana Blok EE No. 14, Gedong Meneng, Bandar Lampung, 35213, Lampung, Indonesia Architect Bennatin Surya Cipta PT Contact Mr Pensong Benny (Director) 62 21 798 1546 / 798 f 62 21 798 1047 1047 Email:
[email protected] Jalan Raya Pasar Minggu Km. 18 No. 1, Pejaten Barat, Pasar Minggu, Jakarta Selatan, 12740, Jakarta, Indonesia Contact Mr Endang Herawan (Project Coordinator) 62 21 798 1546 / 798 f 62 21 798 1047 1047 Email:
[email protected] Jalan Raya Pasar Minggu Km. 18 No. 1, Pejaten Barat, Pasar Minggu, Jakarta Selatan, 12740, Jakarta, Indonesia
Published by BCI Asia Construction Information Pte Ltd, 371 Beach Road, KeyPoint #02-25, Singapore 199597 65 6538 6836 f 65 6538 6896 Email:
[email protected] Website: www.bciasia.com
BCI Asia Construction Bulletin
43