COMPANY PROFILE PT. GRAHA SOLUSI TEKNIK
MAKE DIFFERENCE
ENGINEERING | CONSTRUCTION CONTRACTOR
TABLE OF CONTENT
Pengantar ..................................................................................................................................................................................... 2 Data Administrasi ....................................................................................................................................................................... 3 Visi dan Misi ................................................................................................................................................................................. 4 Kebijakan Perusahaan .............................................................................................................................................................. 5 Kebijakan Keselamatan dan Kesehatan dalam Pekerjaan ............................................................................................... 6 Business Organization Chart – PT. GRAHA SOLUSI TEKNIK ............................................................................................ 7 Team Management .................................................................................................................................................................... 8 1
Legalitas Perusahaan ..................................................................................................................................................... 9 1.1
Surat Pengesahan Badan Usaha .......................................................................................................................... 9
1.2
Surat Domisili Badan Usaha................................................................................................................................ 10
1.3
Surat Keterangan Terdaftar NPWP .................................................................................................................... 11
1.4
Tanda Daftar Perseroan Terbatas ...................................................................................................................... 12
1.5
Surat Izin Usaha Perdagangan (SIUP) Menengah ........................................................................................... 13
1.6
Izin Usaha Jasa Konstruksi ................................................................................................................................. 14
1.7
Angka Pengenal Importir - Umum ..................................................................................................................... 15
1.8
Angka Pengenal Importir - Umum ..................................................................................................................... 16
1.9
Nomor Identitas Kepabeanan ............................................................................................................................. 17
1.10
Sertifikat Badan Usaha Pelaksana Konstruksi Mekanik ................................................................................... 17
1.11
Sertifikat Badan Usaha Pelaksana Konstruksi Elektrik ..................................................................................... 18
1.12
Tanda Anggota PAKLINA .................................................................................................................................... 20
1.13
Sertifikat Ahli Teknik Tenaga Listrik dan Mekanik ........................................................................................... 21
2
Experience List. PT GRAHA SOLUSI TEKNIK........................................................................................................... 22
3
Customer List. PT EKSAKTA SINERGI INDONESIA ............................................................................................... 24
4
Experience List. PT EKSAKTA SINERGI INDONESIA ............................................................................................. 25
5
Total Site in Telecommunication Project................................................................................................................. 27
Service Project in Electrical & Instrumentation Field ....................................................................................................................... 29 Service Project in Telecommunication Field .................................................................................................................................... 34 Tools and Equipments ............................................................................................................................................................. 35 Tools for Installation............................................................................................................................................................. 36 Tools For Commissioning BTS & MW ................................................................................................................................. 36 Tools For Electrical Testing .................................................................................................................................................. 36 Commissioning Tools For Fire Alarm .................................................................................................................................. 36 Safety Equipments ................................................................................................................................................................ 36
1
Pengantar
Dengan mempertimbangkan
Setelah bertahun-tahun berpengalaman dalam menangani proyek-proyek mekanikal,elektrikal, instrumentasi dan sistim komunikasi untuk industri, gedung dan perkantoran.
Merekrut dan menyediakan pekerja terampil di bidang teknik
Keinginan yang kuat untuk mengembangkan kemampuan pekerja dan berkontribusi dalam pembangunan negara.
Kami memutuskan untuk mendirikan sebuah perusahaan, yang mengkhususkan diri dalam bidang konstruksi mekanik, listrik, instrumentasi dan system telekomunikasi sebagai kontraktor, yang bernama:
PT GRAHA SOLUSI TEKNIK Dengan banyaknya pengalaman yang kami miliki dan keyakinan yang kuat, kerja keras dan manajemen yang profesional, kami percaya bahwa kami dapat memenuhi kebutuhan klien kami. PT. GRAHA SOLUSI TEKNIK dikendalikan oleh tim manajemen yang berpengalaman dalam menangani proyek-proyek dalam bidang seperti tersebut diatas serta mendapat dukungan penuh dalam hal financial maupun teknikal dari PT. Eksakta Sinergi Indonesia yang dalam hal ini adalah sebagai sister company Atas dasar pengalaman dan keahlian kami, kami yakin dapat bekerja sama dengan Anda untuk memberikan kinerja terbaik dengan prinsip saling menguntungkan. Demikian yang dapat kami sampaikan.
Jakarta, 14 April 2014
Desti Relawati Direktur
2
Data Administrasi
Alamat Kantor Telepon Kantor Fax E-mail Website
: Jl. Raya Bekasi KM 19. Blok M. No. 30 Pulogadung, Jakarta Timur 13260 : +62.21 29834505 : +62.21 29834505 :
[email protected] : www.ptgst.co.id
Sertifikat dan Legalitas Nama Perusahaan Jenis Usaha Notaris No. Akta Pendirian Tanggal Akta No. Registrasi Perusahaan No. SK Domisili No. Registrasi Pajak No. NPWP No. SIUP No. TDP No. SBU No. SIUJK No. Asosiasi No. SBU No. NIK No. API
: : : : : : : : : : : : : : : : :
PT. Graha Solusi Teknik Perdagangan Umum, Konstruksi dan Jasa Kokoh Henry. SH . mKN 11 April, 14, 2014 AHU-02727.40.10.2014 032/1.842.5 S-4964KT/WPJ.20/KP.0603/2014 70.107.670.5-005.000 509/24.1PM.7/31.75/-1824/e/2016 09.04.1.46.39086 0186682 1-908040-3172-2-00069 V.00.21.VI.14/1147 0186682 01.052865 090612551-P
Rekening Perusahaan Bank No. Rekening Atas Nama
: PT. Bank Negara Indonesia (Persero) : 034 254 4282 : PT. Graha Solusi Teknik
Bank No. Rekening No. Rekening Atas Nama
: : : :
PT. Bank Rakyat Indonesia (Persero) 0230-02-000228-30-4 0230-01-002953-30-7 PT. Graha Solusi Teknik
3
Visi dan Misi
Visi
Mendukung perusahaan Nasional & Internasional di layanan dan solusi di bidang listrik instrumentasi dan telekommunikasi di Indonesia
Menjadi perusahaan yang kompetitif
Menjaga hubungan bisnis jangka panjang atas dasar saling menguntungkan dan kemitraan
Memberikan kualitas terbaik dari pekerjaan dan sesuai standar teknis yang ditentukan
Berusaha lebih baik dari kontraktor lainnya dalam bidang pekerjaan sejenis.
Misi
Memberdayakan sumber daya manusia yang berpengalaman di bidangnya.
Berkomitmen pada perbaikan terus-menerus dalam memberikan sumber daya dan produk berkualitas tinggi.
Mendukung kebutuhan pembangunan di Indonesia .
Memberikan kesejahteraan bagi karyawan dan berkontribusi terhadap lingkungan.
Memberikan pelanggan Produk dan Layanan berkualitas tinggi.
Tumbuh menjadi perusahaan yang sehat , berkualitas tinggi dan menjunjung etika dalam berbisnis.
4
Kebijakan Perusahaan
TUJUAN PERUSAHAAN
Memberdayakan sumber daya manusia yang berpengalaman di bidangnya.
Mendukung kebutuhan pembangunan di Indonesia.
Memberikan kekayaan karyawan dan kontribusi terhadap lingkungan.
Memberikan pelanggan Produk dan Jasa berkualitas.
Tumbuh menjadi Sehat, Berkualitas dengan memegang prinsip etika bisnis
KUALITAS KEBIJAKAN
Kebijakan PT. Graha Solusi Teknik untuk memberikan kualitas yang baik
Antara produk dan layanan, yang sesuai dengan persyaratan kontrak dan peraturan untuk memenuhi kepuasan pelanggan.
Manajemen PT. Graha Solusi Teknik memiliki komitmen terhadap kualitas, oleh sumber daya alokasi yang diperlukan untuk keberhasilan pelaksanaan
BUDAYA PERUSAHAAN
Efektif dan Efisien
Rajin dan Produktif
Nilai tambah pada setiap pekerjaan
Inisiatif dan kreatif
Harmonis dan Team Work yang kuat
5
Kebijakan Keselamatan dan Kesehatan dalam Pekerjaan
PT. Graha Solusi Teknik. Bertanggung jawab secara moral dan hukum untuk menyediakan, mempromosikan dan memelihara lingkungan kerja yang aman dan sehat di seluruh area operasi perusahaan. Tujuan kami adalah untuk mengembangkan dan meningkatkan praktek kerja dan perilaku untuk mencegah cedera, penyakit atau kerusakan properti.
1 2
Keamanan dan Keselamatan sebagai elemen kunci dari tujuan manajemen bisnis
Berkonsultasi dengan karyawan, pelanggan dan pemasok untuk berbagi dan belajar dari satu sama lain pengalaman keselamatan
Memberikan informasi, pelatihan dan kepemimpinan kebutuhan untuk memungkinkan semua personil untuk bekerja dan berperilaku dengan cara yang aman
Meninjau dan memantau standar kesehatan dan keselamatan untuk menentukan efektivitas kebijakan dan program,mengidentikasi area untuk perbaikan dan memastikan kepatuhan terhadap peraturan pemerintah
Memastikan manajemen dan karyawan sepenuhnya peduli dengan tanggung jawab keselamatan mereka dan harapan perusahaan
4
Mengintegrasikan praktek keselamatan dan lingkungan kerja yang aman ke semua tingkat kegiatan perusahaan
8 9
Maksimum mencegah Kecelakaan diwilayah kerja Anda
Memenuhi kebutuhan pelanggan terutama dalam keselamatan
Mengindentifikasi dan antisipasi bahaya keamanan dan merespon segera untuk mengendalikan dan mencegah mereka
6
Business Organization Chart – PT. GRAHA SOLUSI TEKNIK
7
Team Management Direktur
: Desti Relawati
Manager
Administrator
Engineer
1. Agus Wibowo. MT
1. Bayu Kusuma Murti
1. Mashyudi
2. Agung Ginanjar. ST
2. Safitri Laraswati
2. Agus Priyanto
2. Endah Kurniasih
3. Ashara
3. Bayu Pratomo
Supervisor
Staff & Technician
Total Technician
1. Naim Rusdiana
1. Sandy Ramadani
50 Personil
2. Zainal Arifin
2. Wagino
3. Jaya Adiputra
3. Muhamad Arief P.
4. Bambang Cahyadi
4. Mubasir
5. Yayat Hidayat
5. Khayadi
6. Rizul Chodfie
6. Sopiyauloh
8
1
Legalitas Perusahaan 1.1
Surat Pengesahan Badan Usaha
9
1.2
Surat Domisili Badan Usaha
10
1.3
Surat Keterangan Terdaftar NPWP
11
1.4
Tanda Daftar Perseroan Terbatas
12
1.5
Surat Izin Usaha Perdagangan (SIUP) Menengah
13
1.6
Izin Usaha Jasa Konstruksi
14
1.7
Angka Pengenal Importir - Umum
15
1.8
Angka Pengenal Importir - Umum
16
1.9
1.10
Nomor Identitas Kepabeanan
Sertifikat Badan Usaha Pelaksana Konstruksi Mekanik 17
1.11
Sertifikat Badan Usaha Pelaksana Konstruksi Elektrik
18
19
1.12
Tanda Anggota PAKLINA
20
1.13
Sertifikat Ahli Teknik Tenaga Listrik dan Mekanik
21
2
Experience List. PT GRAHA SOLUSI TEKNIK No 1
Description
Order No
Customer
Project Value
Pengadaan Bahan Bakar Solar untuk Genset
No. 17/0921/DLP/GPL/PL1
Bank Indonesia
216,832,000
Data Center BI, Gedung Learning Center BI,
Tgl. 19 Maret 2015 Bank Indonesia
105,403,142
Bank Indonesia
121,984,335
Bank Indonesia
220,757,240
Bank Indonesia
24,994,970
Bank Indonesia
47,250,000
Bank Indonesia
41,149,680
Bank Indonesia
80,037,410
Bank Indonesia
128,597,590
Bank Indonesia
63,460,144
Bank Indonesia
200,450,839
Bank Indonesia
152,006,250
Bank Indonesia
96,679,000
Bank Indonesia
216,832,000
Bank Indonesia
67,872,000
Gedung BI Juanda dan Museum BI Kota 2
Pengadaan Peralatan dan Instalasi Mekanikal Elektrikal Ruang Rapat Besar DLP Lantai 3
No. 17/1127/DLP/GPL/PL1 Tgl. 10 April 2015
Gedung Kebon Sirih KOPERBI Jakarta 3
Perbaikan Isolasi Pipa Lantai 2, Penarikan Kabel Power Chiller Gedung Tipikal dan KWH
No. 17/1458/DLP/GPL/PL1 Tgl. 11 Mei 2015
Meter Gedung Kebon sirih 4
Perbaikan dan Penggantian Peralatan Fire Fighting Gedung Tipikal Arsek KOPERBI
No. 17/1459/DLP/GPL/PL1 Tgl. 11 Mei 2015
Jakarta 5
Pengadaan Kabel Power san aksesorie Kabel untuk Penggantian Instalasi Kabel Power
No. 17/1506/DLP/GPL/PL1 Tgl. 15 Mei 2016
Peralatan AC Split Gedung C dan D KOPERBI Jakarta 6
Penggantian Rollingdoor No. 1 Lantai Basement 1 Gedung C KOPERBI Jakarta
7
Pengadaan dan Pemasangan AC Split Ruang ATM serta Regrouping Lampu Penerangan
No. 17/1736/DLP/GPL/PL1 Tgl. 4 Juni 2015 No. 17/1888/DLP/GPL/PL1 Tgl. 18 Juni 2015
dan Stop Kontak Lt.1 dan 2 Gedung D KOPERBI Jakarta 8
Penggantian Box Hydrant Lengkap (Selang dan Noszzel) di antara Taman Gedung C, D dan
No. 17/2202/DLP/GPL/PL1 Tgl. 13 Juli 2015
Instalasi Pipa Solar di Gedung C KOPERBI Jakarta 9
Penyediaan Power Supply Server OJK Lt.1 Gedung Tipikal KOPERBI Jakarta
10
Service AC dan Penarikan Kabel Power Pressure Fan di Area Data Center KOPERBI
No. 17/2511/DLP/GPL/PL1 Tgl. 11 Agustus 2015 No. 17/2515/DLP/DPL/PL1 Tgl. 11 Agustus 2015
Jakarta 11
Sound Attenuator, Tata Udara dan Relokasi Lampu Parkir di Gedung dan Halaman Gedung
No. 17/2548/DLP/GPL/PL1 Tgl. 13 Agustus 2015
Fasilitas Sosial KOPERBI Jakarta 12
Pengadaan Ring Basket dan Scoreboard untuk Fasilitas Olah Raga di Gedung Fasos
No. 17/2654/DLP/GPL/PL1 Tgl. 21 Agustus 2015
KOPERBI Jakarta 13
Pengadaan Battery Genset pada Menara Radius Prawiro, Menara Sjafrudiin dan
No. 17/2715/DLP/GPL/PL1 Tgl. 28 Agustus 2015
Gedung Thamrin KOPERBI Jakarta 14
Pengadaan Bahan Bakar Solar untuk Genset
No. 17/2830/DLP/GPL/PL1
Data Center, Gedung D dan Gedung Kebon
Tgl. 3 September 2015
Sirih KOPERBI Jakarta 15
Mekanikal Elektrikal Perpustakaan di Menara Sjafrudin Prawiranegara dan Pemasangan
No. 17/2872/DLP/GPL/PL1 Tgl. 7 September 2015
Sanitasi Lantai 24 Menara Radius Prawiro KOPERBI Jakarta 16
Jasa Maintenance ME Rumah Bank Indonesia Periode Juni 2015 sd Mei 2017
17
Pemeliharaan dan Perawatan Peralatan Mekanikal elektrikal (ME) Data Center Bank
No. ESI-PO-1200299
PT. Eksakta Sinergi Indonesia
2,060,810,909
Tgl. 11 September 2015 No. 17/3154/DLP/GPL/PL1
Bank Indonesia
168,846,521
Bank Indonesia
111,278,497
No. 17/3829/DLP/GPL/PL1
Bank Indonesia
196,316,111
Tgl. 24 Nopember 2016 No. DMPT2L/07.12.01/SPK/2015 Tgl. 7 Desember 2015
Badan Pusat
97,570,000
Statistik Jakarta
Tgl. 29 September 2015
Indonesia di Gedung Tipikal KOPERBI Jakarta (Periode Oktober 2015 sd Maret 2016) 18
Pengadaan dan Pemasangan Lampu LED T8, Basement 2 Gedung D KOPERBI Jakarta
19
Penggantian Rollingdoor No. 5, 6 dan 7 Lt.1 Gedung C KOPERBI Jakarta
20
Waterproofing Dak dan Isolasi Ruang Genset Kantor BPS Jakarta
No. 17/3559/DLP/GPL/PL1 Tgl. 30 Oktober 2015
22
No 21
Description Perbaikan Mekanikal Elektrikal Gedung Fasos KOPERBI Jakarta
22
Order No
Customer
Project Value
No. 17/4041/DLP/GPL/PL1
Bank Indonesia
135,897,000
Bank Indonesia
38,830,000
Bank Indonesia
17,767,035
Bank Indonesia
246,961,000
Bank Indonesia
216,658,200
Bank Indonesia
149,072,000
Bank Indonesia
27,164,500
Bank Indonesia
246,961,000
Tgl. 8 Desember 2015
Penyediaan Sarana dan Prasarana Hard Material
No. 17/4089/DLP/GPL/PL1
Kegiatan Acara Peringatan Ibadah dan Perayaan
Tgl. 14 Desember 2015
Natal 2015 di Flores Ballroom, Lobby Level dan Sumba Room 3rd Level Hotel Borobudur Jakarta 23
Pengadaan Spare Part Pemeliharaan untuk Gedung C, D & Masjid KOPERBI Jakarta
24
Pengelolaan Peralatan Mekanikal dan Elektrikal di Gedung Tipikal, Arsek, Data Center
No. 17/4161/DLP/GPL/PL1 Tgl. 21 Desember 2015 No. 14/4246/DLP/GPL/PL1 Tgl. 30 desember 2015
Kebon Sirih, Fasos KOPERBI Jakarta bulan Jan'16 25
Penggantian Spare Parts AC Presisi di Data Center Bank Indonesia KOPERBI Jakarta
26
Pengadaan Bahan Bakar Solar untuk Genset Gedung D, Gedung Fasos, Museum BI Kota
No. 18/115/DLP-GPLPL1/Srt/B Tgl. 14 Januari 2016 No. 18/126/DLP-GPLPL1/Srt/B Tgl. 15 Januari 2016
dan Learning Center BI Jakarta 27
Pemindahan Tukar Unit Genset dari Rumah Jabatan Dewan Gubernur Bank Indonesia
No. 18/137/DLP-GPLPL2/Srt/B Tgl. 22 Januari 2016
Jl. Senopati 8 ke Rumah Jabatan Dewan Gubernur Bank Indonesia Jl. Panglima Polim 28
Pengelolaan Peralatan Mekanikal dan Elektrikal di Gedung Tipikal, Arsek, Data Center
No. 18/311/DLPGPL/PL1/Srt/B Tgl. 29 Januari 2016
Kebon Sirih, Fasos KOPERBI Jakarta bulan Feb'16
23
Customer List. PT EKSAKTA SINERGI INDONESIA
3
No
Customer Name
Field
1
PT. NOKIA SIEMENS NETWORKS
Telecommunication
2008 - 2012
2
PT. GRAHA USAHA TEKNIK
Telecommunication
2008 - 2011
Electrical & Instrumentation
2010 - 2011
Electrical 3
PT. SIEMENS INDONESIA
Years
2011
Electrical & Instrumentation
2008 - 2014
Building Maintenance
2013 - 2014
4
PT. SINAR REKAYASA TEKNIK
Electrical & Instrumentation
2009 - 2011
5
PT. AREVA T&D
Electrical
2009 - 2012
6
PT. HANDIJAYA SUKATAMA
Electrical
2009
7
CV. CAHAYA AGUNG SENTOSA
Electrical
2009
8
PT. STARWAY
Telecommunication
2009 - 2010
9
PT. FIRETECH PERKASA
Fire Alarm System
2010
10
PT. ALCORA MITRA PRATAMA
Electrical
2010 - 2011
11
PT. SMS ENERGY
Electrical
2011
12
PT. SARANA INSTRUMENT
Electrical
2011
13
PT. AURA MITRA GANGSA
Electrical
2011
14
PT. YASA INDUSTRI NUSANTARA
Electrical
2011
15
PT. MITRA INTI DINAMIKA
Electrical
2011
16
PT. HUAWEI TECH INVESTMENT
Telecommunication
2012
17
PT. MAKMUR SEJAHTERA WISESA
Electrical
18
PT. INTEX TELECOM SYSTEM INDONESIA
Telecommunication
2014
19
PT. NOKIA SOLUTIONS and NETWORKS INDONESIA
Telecommunication
2013 - 2014
20
PT. ABADI BANGUN PERKASA
Electrical
2014
21
PT. FITI INDONESIA
Electrical
2014
22
PT. ALSTOM
Electrical & Instrumentation
2014
23
PT. MEINDO ELANG INDAH
Electrical & Instrumentation
2014
24
PT. SAPTA INDRA SEJATI
Electrical
2015
25
PT. SEMEN PADANG
Electrical & Instrumentation
2016
2012 - 2013
24
4
Experience List. PT EKSAKTA SINERGI INDONESIA SUBSTATION PROJECT
END USER
ORDER
YEAR
PLN
PT. Siemens Indonesia - PTD
2012
Gardu Induk PLN. Padang Sambian BALI Installation, Test and Commissioning : 150kV (5 Line bay : 2 Transformer bays, 1 Bus coupler bay, 2 Outgoing bays ) Gardu Induk PLN. Krembangan SURABAYA Installation, Test and Commissioning Relay Control Panel : 150kV (5 Line bay : 2 Transformer bays, 1 Bus coupler bay, 2 Outgoing bays )
PLN
PT. Siemens Indonesia - PTD
2012
PLN
PT. Siemens Indonesia - PTD
2013
PLN
PT. Siemens Indonesia - PTD
2013
END USER
ORDER
YEAR
PT. Newmont Nusa Tenggara
PT. Siemens Indonesia. PG
2008
CHEVRON
AREVA. T&D
2009
GOLAR FSRU Offshore West JAVA
PT. Siemens Indonesia. PG-OG
2013
CHEVRON
Torishima Guna Engineering
2014
Meindo Elang Sakti
2014
Gardu Induk PLN. Cibabat BANDUNG Installation, Test and Commissioning Relay Control Panel : 150kV (5 Line bay : 2 Transformer bays, 1 Bus coupler bay, 2 Outgoing bays Gardu Induk PLN. Marunda JAKARTA Installation, Test and Commissioning Relay Control Panel : 150kV (5 Line bay : 2 Transformer bays, 1 Bus coupler bay, 2 Outgoing bays
MINING, OIL & GAS PROJECT Unit-52 Major Outage 2008, PT. Newmont Benete Field Electrical & Instrumentation Combustion Inspection : Check electrical device relay protection and control system, Instrument calibration and setting. : TAR 2009 Chevron Geothermal Indonesia, Drajat Garut Installation, Test and Commissioning : Dismantle, re-install & commissioning 13,8kV and 6,3kV Auxiliary bus-duct, Auxiliary Transformer 10 MVA, 6.3 kV Medium Voltage, 380 Volt Switchboard and 380 Volt Motor Control Center GOLAR FSRU Offshore West JAVA Modification, setting and test : Modification & relay setting for Sea water pump, transformer, bus coupler steam generator and diesel generator. Chevron Geothermal Indonesia, Salak-Sukabumi Installation, Test and Commissioning : Dismantle, re-install & commissioning, 380 Volt Switchboard and 380 Volt Motor Control Center Pertamina Refinery Unit VI Balongan Installation, Test and Commissioning
INDUSTRIAL PROJECT Installation Network system, lighting and small power Installation and test : Installation and test network system, distribution panel, lighting and small power. Installation and test lighting and small power Installation and test : Installation and test distribution panel, lighting and small power. Sengkang EMO GT-21 South Sulawesi Electrical and Instrument : Dismantle Siemens Turbine Electrical & Instrument Equipments. Sengkang EMO GT-21 Emergency Outage South Sulawesi Electrical and Instrument : Inspection and verify for Electrical & Instrument Equipments
PERTAMINA
END USER
ORDER
YEAR
NSN Regional Office, Palembang
PT. Nokia Siemens network
2009
Honda Showroom Danau Sunter, Jakarta
PT. Handijaya Sukatama
2009
Power Plant Sengkang South Sulawesi
PT. Siemens Indonesia. PG
2009
Power Plant Sengkang South Sulawesi
PT. Siemens Indonesia. PG
2010
END USER
ORDER
YEAR
Installation and Commissioning : Installation and Commissioning of Automation Genset
INDUSTRIAL PROJECT
25
Wiring and testing PLC/HMI panel Workshop Duren Sawit, Jakarta
PT. Alcora Mitra Pratama
Building A & B, Pulomas Jakarta
PT. Siemens Indonesia BA
2010
Bontang, Kalimantan Timur
PT. Firetech Perkasa
2010
PT, Krakatau Steel (SSP-1)
PT. Siemens Indonesia. A&C
2010
PT, Krakatau Steel (HMS)
PT. Siemens Indonesia. A&C
2010
Pulomas, Jakarta
PT. Siemens Indonesia.
2010
PT. Guna Nusa Fabricators
PT. Graha Usaha Teknik
PT. Pertamina Tanjung Priok, Jakarta
PT. Alcora Mitra Pratama
2011
PT. Pertamina Tanjung Priok, Jakarta
PT. Yasa Industri Nusantara
2011
Arkadia, Jakarta
PT. Siemens Indonesia.
2011
Daihatsu Sunter, Jakarta
PT. SMS Energy
Installation, test and Commissioning : Installation, test and Commissioning CCTV 6 units for Furnace EAF-6, EAF-7 and EAF-8.
PT, Krakatau Steel (SSP-1)
PT. Siemens Indonesia. A&C
2011
IKPP 20kV GIS & Cables Installation, Test and Commissioning : Installation, termination and commissioning Medium-Voltage Switchgear Type 8DA Extendable FixedMounted Circuit-Breaker Switchgear up to 40.5 kV, Single Bus-bar, SinglePole Metal-Enclosed, Gas-Insulated
PT. Indah Kiat Pulp & Paper Serang, Banten
PT. Siemens Indonesia. A&C
2012
PT. Sunrise Textile, Bekasi
PT. Siemens Indonesia. A&C
2012
Maintenance & Purifying Transformer 550kVA Maintenance, purifying, Test and Commissioning : Transformer 550kV
Arkadia
PT. Siemens Indonesia. A&C
2013
ITP Simoprime world 20kV Panel Finish Mill Installation, Test and Commissioning : Installation & Commissioning of Simoprime World Panel 20kV Finish Mill
ITP Cibinong, Bogor
PT. Siemens Indonesia. PTD
2013
ITP Simoprime world 20kV Panel Raw Mill Installation, Test and Commissioning : Installation & Commissioning of Simoprime World Panel 20kV Raw Mill P3&P4
ITP Cibinong, Bogor
PT. Siemens Indonesia. PTD
Wiring and testing : Wiring and testing Control system PLC/HMI Allen Bradley for 94 cubicle
2009 & 2010
Installation network system, lighting and small power Installation and test : Installation and test network system, distribution panel, lighting and small power. Maintenance and repair Fire Alarm System Maintenance, setting and repair : Maintenance, setting and repair fire alarm system, re-set and testing equipment KS, Steelelting Shop (SSP1) Revitalization Project. Installation, Test and Assistance Commissioning : Erection & termination GIS MV Switchgear type 8DA10 Extendable Fixed-Mounted Circuit-Breaker Switchgear up to 40.5 kV, Assistance Commissioning 6kV, 20kV Switchgear & 400V LV cubicle at Furnace Breaker 7 & 8, Termination 24kV KS_HSM Retrofit Project, Cilegon Installation, Test and Assistance Commissioning : Installation, pulling, termination and test control device system, PLC/HMI Maintenance of Billboard Maintenance and repair : Maintenance and repair billboard Siemens OFFSHORE Phase II (Fabrication CPP & AUP Platform) Project, HESS Ujung Pangkah Instrument, Electrical and Telecom Installation : Instrument & telecom : Cable pulling, termination, Installation Instrument equipment, JB, Paging, CCTV, Microwave transmission, alarm, telecommunication system, Electrical : Cable pulling, termination LV, MV, small power, lighting, 20 kV / 400V MCC Switchgear, Generator, Transformer & UPS system.
2010-2011
Supply 400 VAC power system for MCC Pertamina Installation, pulling and termination : Installation MCC panel, puling and termination cables 2x 4x300sqmm from Generator to MCC panel Installation and test instrument system Installation and calibration : Installation and calibration pressure valve, pressure switch etc. Maintenance of SIEMENS Sign Maintenance and repair : Maintenance and repair of SIEMENS Sign Installation Automation Genset Installation and Commissioning : Installation and Commissioning of Automation Genset
2011
Installation CCTV SSP-1
Dismantling & re-install of 8DJH 20kV panel L type Dismantle, Installation, test & commissioning : Dismantle, Installation, test & commissioning of 8DJH 20 kV panel
MAINTENANCE PROJECT
END USER
ORDER
2013
YEAR
26
North Duri Cogeneration Plant, Chevron, Riau Electrical Protection, switchgear, MCC, Transformer & Instrumentation Inspection and test Hot Gas Path Inspection (HGPI) & Combustion Inspection (CI) : Inspection electrical and test : Transformer Protection, Inspect & verify of transformer, oil temperature, buchkholz, pressure relief device, tank conservator oil level, tap changer, sudden pressure relay. General electric MDP relay (MDP-OI), voltage & Frequency transducer, auto synchrocheck relay busler and auxiliary contact from corrosion & replace if necessary.
MCTN CHEVRON
PT. Siemens Indonesia. PG
2008 & 2009
MCTN CHEVRON
PT. Sinar Rekayasa Teknik
2009 & 2011
2014 - 2015
North Duri Cogeneration Plant, Chevron, Riau Electrical Protection, switchgear, MCC, Transformer & Instrumentation Inspection and test Hot Gas Path Inspection (HGPI) & Combustion Inspection (CI) : Inspection electrical and test : Trafo Protection, Inspect & verify of trafo, oil temperature, buchkholz, pressure relief device, tank conservator oil level, tap changer, sudden pressure relay. General electric MDP relay (MDP-OI), voltage & Frequency transducer, auto syncrhron check relay busler and auxiliary contact from corrosion & replace if necessary. Building Maintenance
*Pulomas Factory
Electrical, Mechanical and Civil
*Arkadia Office
PT. Siemens
*Cilegon Factory
Indonesia `
Perawatan Elektrikal dan Mekanikal Rumah Dinas Jabatan Dewan Gubernur
TRANSMISION PROJECT
Bank Indonesia
Bank Indonesia
2015 - 2017
END USER
ORDER
YEAR
PT ADARO Tanjung Tabalong, South Kalimantan.
PT Makmur Sejahtera Wisesa
2012 & 2013
PT. Sapta Indra Sejati Tanjung Tabalong Kalimantan
PT. Sapta Indra Sejati
2015
Overhead Line 20kV power distribution for WTP & WIP Electrical and Civil Installation, test and Commissioning : Installation of 20kV concrete pole included accessories and OHL / underground cables, soil test investigation, WTP & WIP Gardu compact erection, additional high for concrete pole by pedestal up to 4 m, test and Commissioning Overhead Line 20kV power distribution for TR1 & TR2 Electrical and Civil Installation, Test and Commissioning Installation of 20kV concrete pole included accessories and OHL / underground cables, soil test investigation, TR1 & TR2 Gardu. test and Commissioning
5
Total Site in Telecommunication Project
27
Region Jabodetabek
Customer
Scope of Work
Total
Huawei Huawei Huawei Huawei Huawei
MW MW MW MW MW
Dismantle and Packing Installation and Commissioning Upgrade Upgrade Upgrade
Antenna MW (0.3m - 1.2m) Ip Migration Capacity: Below tower Capacity Upgrade: Exclude antenna MW PDH (0.3m - 1.2m)
95 27 24 50 111
NSN NSN NSN NSN NSN
MW SDH SDH SDH SDH
Upgrade Installation Upgrade Installation Installation
Cell Max GSM Antenna HiT 7035/7050/7070/7300 Capacity Waveguide SRA4 (2.4m - 3.0m)
Huawei Huawei
MW MW
Installation and Commissioning Upgrade
CE & WRFU Expansion Capacity & Protection
67 15 4 2 15 410 205 86
NSN NSN
SDH SDH
Installation Installation
Rectification Capacity SRA4 (2.4m - 3.0m)
East Java
NSN NSN NSN NSN NSN
SDH SDH SDH SDH MW
Installation Installation Installation Installation Installation and Commissioning
HiT 7035/7050,7070/7300 Rectification Capacity SRA4 (2.4m - 3.0m) Waveguide Cell Max GSM Antenna
West Java
Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei
BTS MW MW MW MW MW MW MW MW MW
Installation and Commissioning Installation and Commissioning Installation and Commissioning Installation and Commissioning Dismantle and Packing Upgrade Upgrade Upgrade Upgrade Upgrade
Total BTS/NodeB Colo Sub-system/Cabinet PDH-MW (0.3m - 1.2m) PDH-MW (1.2m - 1.8m) PDH-MW (0.3m - 1.2m) Changes ODU / IDU Capacity: Below tower Capacity: MW PDH (0.3m - 1.2m) Capacity & Protection Capacity (Upgrade Software)
NSN NSN NSN NSN NSN NSN
BTS MW SDH SDH SDH SDH
Installation and Commissioning Installation and Commissioning Installation Installation Installation Installation
BS241 Indoor/Outdoor 2G BS1 PDH-MW (0.3m - 1.2m) HiT 7035/7050/7070/7300 Rectification Capacity SRA4 (2.4m - 3.0m) Waveguide
Huawei Huawei Huawei Huawei Huawei Huawei
BTS BTS BTS MW MW MW
Installation and Commissioning Installation Installation and Commissioning Survey Dismantle and Packing Installation and Commissioning
Total BTS/NodeB: Antenna Mounting Hardware Installation Macro BTS/NodeB Engineering & Design (BTS+MW) PDH-MW (0.3m - 1.2m) PDH-MW (0.3m - 1.2m)
NSN NSN
SDH SDH
Installation Installation
HiT 7035/7050/7070/7300 SRA4 (2.4m - 3.0m)
Total Central Java
Total
Bali-Lombok
North Sumatra
South Sumatra
TOTAL
NSN NSN NSN NSN NSN NSN NSN NSN NSN NSN
NSN NSN NSN NSN
BTS BTS MW MW MW SDH SDH SDH SDH SDH
SDH SDH SDH SDH
Installation Dismantle and Packing Dismantle and Packing Installation and Commissioning Installation and Commissioning Installation Installation Installation Upgrade Installation
Installation Installation Installation Installation
6 4 301 5 11 29 8 3 56 294 123 156 5 14 42 18 38 12 153 42 42 6 12 19 7 983 11 3 18 232 5 25
Total
2 4 300
Total
160 29 29 207 7 8 12 31 6 17 506
Total
2 17 17 9 45
BS241 Indoor/Outdoor 2G BS1 BS241 Indoor/Outdoor 2G BS1 PDH-MW (0.3m - 1.2m) PDH-MW (0.3m - 1.2m) Cell Max GSM Antenna HiT 7035/7050/7070/7300 Rectification Capacity SRA4 (2.4m - 3.0m) Capacity Waveguide
HiT 7035/7050/7070/7300 Rectification Capacity SRT1F (2.4m - 3.0m) Waveguide
2,621
Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Site/Hop Hop Hop Hop Hop Site/Hop Hop Hop Hop Hop Hop Site/Hop Sites Sites Hop Hop Hop Hop Hop Hop Hop Hop Sites Hop Hop Hop Hop Hop Site/Hop Sites Sites Sites Sites Hop Hop Hop Hop Site/Hop Sites Sites Hop Hop Hop Hop Hop Hop Hop Hop Site/Hop Hop Hop Hop Hop Site/Hop
Site/Hop
28
Service Project in Electrical & Instrumentation Field UJUNG PANGKAH DEVELOPMENT OFFSHORE PHASE II CPP & AUP EPCC PROJECT. PT. EKSAKTA SINERGI INDONESIA, working on HESS platform construction under the customer PT. Graha Usaha Teknik with located at PT Gunanusa Fabricator, Bojonegara Cilegon which consists of 4 platform modules, namely: Compression & Production Platform (CPP), Compression Module(CM), Accommodation & Utilities Platform(AUP) & Living Quarter (LQ).
The job description consist installation of Electrical, Telecom system, Instrumentation & Hook up Instrumentation. 1.
Electrical System. Installation of LV & MV cubicle. Installation of Transformer. Installation of Emergency diesel. Installation of Fire water pump. Installation of Gas Turbine Generator. Pulling & termination of Control, LV & MV cables. Pre-commissioning & Commissioning
2.
3.
Telecom System. Installation of Digital Microwave Radio (DMR). Installation of VHF & UHF system. Installation of Public Address / General Alarm (PAGA system). Installation of Closed Circuit Television (CCTV system). Installation of Telephone, Private Automatic Branches Exchange (PABX) & Local Area Network (LAN) system. Installation of Entertainment system. Pulling & termination of Telecom cable.
Instrumenttation System. Installation of Emergency Shutdown (ESD) System. Installation of Process System (PCS). Installation of Fire & Gas System (FGS). Installation of Instrument equipment (PT, LT, FT, TT, SDV) Hook up & Tubing installation. Calibration test. Loop check.
After 6 months fabrication process is carried out at PT Gunanusa, these modules are delivered to its destination in Ujung Pangkah (offshore, 40km from Gresik ) using a barge.
29
COMBUSTION TURBINE HOT GAS PATH INSPECTION AND COMBUSTION INSPECTION NORTH DURI COGENERATION PLANT, RIAU
PT EKSAKTA SINERGI INDONESIA performed an Electrical & Instrumentation Inspection services during Hot Gas Path Inspection (HGPI) & Combustion Inspection (CI) of Combustion Turbine North Duri Cogeneration Plant, Riau. The Services is lump-sump for planned maintenance schedule during contract period and be performed in prudent manners and shall comply with Safety, Health & Environmental regulation and procedures.
The Electrical Inspection scope of work included the following:
30
1. 2. 3. 4. 5. 6. 7. 8. 9. 10.
Protection Cabinet Main Transformer Station Service Transformer Generator Insulated Phase Bus MV Switchgear LV Switchgear LV Motor Control Center Starting Motor Grounding System
The Instrumentation Inspection scope of work included the following: 1. 2. 3.
Combustion Turbine Instrumentation System Heat Recovery System Generators Instrumentation System Generator Instrumentation System
Fig.2_Measurement of voltage residue after shutdown plant
Fig.1_Wear proper PPE before & during activity Our Client is very concern about Safety, Health & Environmental regulation and procedures. Before starting every activity we have to submit Standard Repair Procedure & Job Safety Analysis as the completeness of permit to work. Personal Protective Equipment related to the job has to be worn as a mandatory.
Fig.3_Install grounding stick on MV Switchgear
31
Fig.4_ Verifying transformer protection relay function
Fig.5_ Replace gasket of transformer bushing HV side 230kV
Fig.6_ 20kV GIS Cable Arrangement at IKPP Serang
Fig.7_ 20kV GIS Cable & Relay HV test at IKPP Serang
Fig.8_ Move the Post Insulator into its Support install
Fig.9_ Disconnection Switch function test
Overhead Line 20kV Power Distribution for WTP & WIP
32
Fig.1_ 20kV Transmission
Fig.2_ 20kV End Pole
Fig.3_Safety talk / briefing
Fig.4_Commissioning 20kV panel.
Fig.5_ Energize 20kV panel transmission
Fig. 6_Energize 20kV panel transmission
33
Service Project in Telecommunication Field
View of telecom tower
PDH & SDH Microwave that have been Implemented
View of completed BTS/Node B & service Rack Enclosure that have been Implemented.
34
Toolbox meeting conducted and documented
Personnel to pray before starting work
Tools
First aid kit available on site
Personnel Protection Equipment such as function of work team
Tools and Equipments
35
Tools for Installation 1. Standard Electrical Tool : 10 boxes 2. Standard Mechanical Tool : 10 boxes Tools For Commissioning BTS & MW 1. 2. 3. 5. 6. 7.
Digital Multimeter BER Test Noted book Site Master (Anritsu) Compass Shuunto Halca : 5 sets
: : : : :
5pcs 1 pcs 5 pcs 1 units 3 sets
: : : : : : : : : : :
2 4 2 2 1 1 1 1 1 1 1
Tools For Electrical Testing 1. AC/DC Clamp Meter 2. Digital Multi Tester 3. Phase Sequence 4. Digital Insulation Tester 5. DC HIPOT Tester 6. Digital Earth Tester 7. Temperature Tester 8. Omicron CPC 100 9. Omicron CMC 256 10.CB Analyzer 11.Michroohmmeter
sets sets sets sets set sets sets set set set set
Commissioning Tools For Fire Alarm 1. 2. 3. 4. 5. 6. 7. 8. 9.
Standard tool set for technician Dual rs232 ITF box B3D 021 ST key SWE11 M3C011 Laptop w/ Software Algoworks Smoke Detector Test (RE6 O.H.ST) Heat Detector Test (RE6T O.H.ST) Telescope rod 1,6m/4m FDUM 291 Test gas can REF 8 (Aerosol) Grounding Tester
: : : : : : : : :
2 1 1 1 1 1 1 1 1
boxes pc pc Unit pc pc pc pc pc
: : : : :
20 pcs 10 pcs 30 pcs 6 pcs 6 pcs
Safety Equipments 1. 2. 3. 4. 5.
Safety Helmet with Chin Strap Safety Helmet for Climber Full Body Safety Harness w/ lanyard Rubber Safety Gloves 10kV Fire Extinguisher
36
Address
: Jl. Bekasi Raya KM 19 No 30M, Pulogadung Jakarta Timur
Phone
: +62 21 29834505
Fax
: +62 21 29834505