KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL
Buku Acuan
K e s i a p a n
Sektor ESDM
Menjalani ik ud
.es d m
.id
AYO MUDIK
Menghadapi IDUL FITRI 1438 H
.
go
ayo m
RAMADHAN &
www.esdm.go.id
#EnergiBerkeadilan @KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
i
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
ii
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL
BUKU ACUAN KESIAPAN SEKTOR ESDM
MENJALANI RAMADHAN & MENGHADAPI IDUL FITRI 1438 H
#EnergiBerkeadilan www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
iii
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
SAMBUTAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
iv
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
S
egala puji dan syukur kami panjatkan kehadirat Tuhan Yang Maha Kuasa, karena atas berkat dan karunia-Nya kami dapat melaksanakan tugas yang diamanatkan negara di sektor Energi dan Sumber Daya Mineral hingga triwulan ke-2 di tahun 2017 ini. Pemerintah menempatkan prioritas tertinggi dalam melayani kebutuhan rakyat akan minyak bumi, gas, listrik dan dalam mengantisipasi bencana geologi, berupa kejadian gunung meletus, gerakan tanah maupun tsunami. Hal ini menjadi perhatian lagi, khususnya menghadapi hari besar keagamaan dan libur umum, yang biasanya diikuti dengan mobilitas masyarakat yang tinggi. Berkenaan hal tersebut, memasuki Bulan Ramadhan Tahun 2017 ini, Saya dan jajaran telah melakukan berbagai persiapan dalam menghadapi Ramadhan dan Idul Fitri 1438 H. Buku ini, merupakan agenda utama tahunan kami guna menyediakan acuan yang dapat menjelaskan kepada para pejabat, petugas pelayanan dan masyarakat luas mengenai data dan informasi kesiapan Sektor Energi dan Sumber Daya Mineral (ESDM) dalam penyediaan energi dan antisipasi bencana geologi untuk menghadapi Ramadhan dan Idul Fitri 1438 H, khususnya terkait stok BBM, LPG nasional, pasokan gas bumi, pasokan listrik serta potensi bencana geologi. Saya juga telah memerintahkan jajaran Kementerian ESDM bersama stakeholder di sektor ESDM, untuk membentuk posko (pos komando) yang bertugas dari tanggal 10 Juni 2017 hingga 11 Juli 2017, guna mengendalikan dan memantau kelancaran penyaluran BBM, LPG, gas bumi, kesiapan listrik dan antisipasi terjadinya gunung meletus, gerakan tanah dan bencana tsunami. Dengan persiapan yang telah dilakukan tersebut dan dengan terbitnya buku ini, Saya berharap masyarakat Indonesia dapat dengan tenang melakukan aktivitasnya di sekitar Ramadhan dan Idul Fitri 1438 H.
Jakarta, Mei 2017 Menteri Energi dan Sumber Daya Mineral, Ignasius Jonan
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
v
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
DAFTAR ISI
SAMBUTAN MENTERI ENERGI DAN SUMBER DAYA MINERAL
IV
DAFTAR ISI
VI
1.
1 2 3
UMUM 1.1. KESIAPAN SEKTOR ESDM DALAM MENGHADAPI BULAN RAMADHAN DAN HARI RAYA IDUL FITRI 1438 H 1.2. PEMBENTUKAN POSKO DAN SATGAS 1.3. KONDISI PENYEDIAAN ENERGI DAN ANTISIPASI BENCANA GEOLOGI
2. PARAMETER PENGAMANAN PASOKAN 2.1. UPAYA PERTAMINA DALAM MENGAMANKAN PASOKAN BBM DAN LPG MENGHADAPI IDUL FITRI 1438 H/2017 M 2.2. PREDIKSI STOK BBM DAN LPG PERIODE RAMADHAN DAN IDUL FITRI 1438 H 2.3. ESTIMASI PENINGKATAN KONSUMSI 2017 VS REALISASI 2016 2.4. ESTIMASI PENINGKATAN KONSUMSI AVTUR 2.5. ESTIMASI PENINGKATAN KONSUMSI BBM 2.6. ESTIMASI PENINGKATAN KONSUMSI LPG
6 7 8 9 14 15 16
3.
18 19 20 21 22 23 24 25
vi
UPAYA PENGAMANAN PASOKAN 3.1. DUKUNGAN YANG DIPERLUKAN INSTANSI DAN APARAT PEMERINTAH 3.2. PREDIKSI MASA PUNCAK MUDIK DAN BALIK LEBARAN 2017 3.3. JALUR RAWAN KEMACETAN DAN KEPADATAN LALU LINTAS 3.4. PERMASALAHAN PENYALURAN BBM PADA MASA LEBARAN 2017 3.5. UPAYA MENGAMANKAN PASOKAN BBM DAN LPG 3.6. PERMASALAHAN PENYALURAN BBM PADA MASA LEBARAN 2017 3.7. UPAYA MENGATASI KELANGKAAN LPG
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
4.
KESIAPAN PENYEDIAAN TENAGA LISTRIK 4.1. KONDISI KELISTRIKAN PADA MEI 2017 4.2. KONDISI SISTEM KELISTRIKAN NASIONAL BULAN MEI 2017 4.3. PROGNOSA KONDISI SISTEM KELISTRIKAN PADA IDUL FITRI 1438 H (25 JUNI 2017 4.4. PROGNOSA KONDISI SISTEM KELISTRIKAN PADA IDUL FITRI 1438 H (26 JUNI 2017) 4.5. KONDISI PENYEDIAAN TENAGA LISTRIK PADA IDUL FITRI 1438 H (25 JUNI 2017) 4.6. UPAYA PENGAMANAN PASOKAN LISTRIK
26 27 28 29 30 31 32
5.
KESIAPAN ANTISIPASI BENCANA GEOLOGI 5.1. ANTISIPASI BENCANA GEOLOGI 5.2. UPAYA ANTISIPASI BENCANA GEOLOGI 5.3. KLASIFIKASI GUNUNGAPI 5.4. PETA SEBARAN GUNUNGAPI INDONESIA 5.5. STATUS KEGIATAN GUNUNGAPI DI ATAS NORMAL S.D. 12 APRIL 2017
34 35 36 37 38 39
6. POSKO, WEBSITE DAN EMAIL 6.1. JADWAL POSKO H-15 S.D. H+15 RAMADHAN DAN HARI RAYA IDUL FITRI 1438 H 6.2. POSKO BERSAMA MENGHADAPI RAMADHAN DAN HARI RAYA IDUL FITRI 1438 H 6.3. POSKO SATGAS LEBARAN 2017 6.4. WEBSITE DAN EMAIL
40 41 42 43 44
LAMPIRAN A. KESIAPAN PENYEDIAAN BBM B. KESIAPAN PENYEDIAAN LPG C. KESIAPAN PASOKAN LISTRIK D. MITIGASI BENCANA GEOLOGI
45 46 68 82 86
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
vii
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
BAB I
UMUM
viii
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
1.1. KESIAPAN SEKTOR ENERGI DAN SUMBER DAYA MINERAL DALAM MENGHADAPI RAMADHAN DAN IDUL FITRI 1438 H BBM
• Premium • Kerosene • Solar • Pertamax • Pertamax Plus • Avtur
www.esdm.go.id
LPG
LPG untuk Rumah Tangga
@KementerianESDM
BBG
LISTRIK
BBG untuk Transportasi
• Kapasitas terpasang • Daya mampu Pasok • Cadangan Daya
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
ANTISIPASI BENCANA GEOLOGI
• Peta titik Rawan Gerakan Tanah • Status Gunung Merapi • Peta Rawan Gempa Bumi
@kesdm
1
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
1.2. PEMBENTUKAN POSKO DAN SATGAS 1. BBM DAN LPG PUSAT : •
POSKO KANTOR KEMENTERIAN ESDM
•
SATGAS PERTAMINA PUSAT
DAERAH :
2
•
SATGAS PERTAMINA UNIT PEMASARAN REGION I MEDAN (NAD, SUMUT, RIAU, KEPRI, SUMBAR)
•
SATGAS PERTAMINA UNIT PEMASARAN REGION II PALEMBANG (SUMSEL, JAMBI, BENGKULU, LAMPUNG, BABEL)
•
SATGAS PERTAMINA UNIT PEMASARAN REGION III JAKARTA (DKI, BANTEN, JABAR)
•
SATGAS PERTAMINA UNIT PEMASARAN REGION IV SEMARANG (JATENG, DIY)
•
SATGAS PERTAMINA UNIT PEMASARAN REGION V SURABAYA (NTB, NTT, BALI, JATIM)
•
SATGAS PERTAMINA UNIT PEMASARAN REGION VI BALIKPAPAN (KALTIM, KALSEL, KALBAR, KALTENG)
•
SATGAS PERTAMINA UNIT PEMASARAN REGIONVII MAKASAR (SELURUH SULAWESI)
•
SATGAS PERTAMINA UNIT PEMASARAN REGION VIII JAYAPURA (MALUKU, MALUKU UTARA, PAPUA BARAT)
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
2. LISTRIK
• • PUSAT : • • POSKO KANTOR KEMENTERIAN ESDM • DAERAH : • • SATGAS P2B JAWA-BALI • • SATGAS P3B SUMATERA • • SATGAS WILAYAH ACEH • • SATGAS WILAYAH SUMATERA UTARA • • SATGAS WILAYAH SUMATERA BARAT • • SATGAS WILAYAH RIAU DAN KEP. RIAU • • SATGAS WILAYAH BANGKA BELITUNG • • SATGAS WILAYAH SUMSEL, JAMBI, DAN BENGKULU • • SATGAS WILAYAH KALIMANTAN BARAT • • SATGAS WILAYAH KALSEL DAN KALTENG •
SATGAS SATGAS SATGAS SATGAS SATGAS STAGAS SATGAS SATGAS SATGAS SATGAS SATGAS SATGAS SATGAS SATGAS SATGAS
WILAYAH KALIMANTAN TIMUR DAN KALTARA WILAYAH SULUTTENGGO WILAYAH SULSELRABAR WILAYAH MALUKU DAN MALUKU UTARA WILAYAH NUSA TENGGARA BARAT WILAYAH NUSA TENGGARA TIMUR WILAYAH PAPUA DAN PAPUA BARAT DISTRIBUSI LAMPUNG DISTRIBUSI DKI JAYA DAN TENGERANG DISTRIBUSI BANTEN DISTRIBUSI JABAR DISTRIBUSI JATENG DAN DIY DISTRIBUSI JATIM DISTRIBUSI BALI PLN BATAM
3. ANTISIPASI BENCANA GEOLOGI PUSAT : • POSKO KANTOR KEMENTERIAN ESDM DAERAH : • PUSAT VULKANOLOGI DAN MITIGASI BENCANA GEOLOGI BANDUNG • SEKRETARIAT BADAN GEOLOGI, BANDUNG
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
3
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
1.3. KONDISI PENYEDIAAN ENERGI DAN ANTISIPASI BENCANA GEOLOGI Prognosa Stok BBM Nasional pada periode mudik (10 Juni 2017 s.d.11 Juli 2017) dalam kondisi Aman, dengan rata-rata stok pada periode tersebut yaitu Premium 1.253.443 KL (23 hari); Minyak Solar 1.887.540 KL (27 hari); Pertalite 1.137.822 KL (20 hari); Avtur 374.641 KL (26 hari); Pertamax 740.926 KL (22 hari); Pertamax Turbo 19.250 KL (22 hari); Dex 21.620 KL (32 hari). Pertamina telah menyiapkan SOP Tanggap Darurat di 30 titik rawan macet.
Prognosa Stok LPG Nasional Untuk periode Hari Raya Idul Fitri 1438 H/2017 M (10 Juni 2017 s.d. 11 Juli 2017) perkiraan ketahanan stock rata-rata 326.371 MT (16 hari). Pertamina telah menyiapkan SOP Tanggap Darurat selama periode mudik.
4
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
KONDISI PENYEDIAAN ENERGI DAN ANTISIPASI BENCANA GEOLOGI Prognosa Kondisi Sistem Kelistrikan pada periode saat ini secara umum dalam Kondisi Normal dan Siaga, dimana daya mampu pembangkit sebesar 39.814 MW dan beban puncak sebesar 31.139 MW sehingga masih terdapat cadangan daya sebesar 8.675 MW. Untuk kondisi kelistrikan sistem Jawa Bali dalam kondisi Normal, sedangkan untuk sistem luar Jawa Bali secara umum dalam kondisi Siaga. Namun dalam periode H-15 s.d. H+15 Idul Fitri 1438 H/2017 M diharapkan kondisi siaga berubah menjadi kondisi Cukup.
Mitigasi Bencana Geologi Intensitas curah hujan pada bulan Juni 2017 di beberapa wilayah (Sumatera Utara, Sumatera Barat, Lampung, sebagian Jawa Barat, sebagian Jawa Tengah bagian selatan, Sulawesi Selatan, dan NTT bagian Barat) menunjukkan tanda-tanda peningkatan termasuk potensi bencana geologi. Terkait potensi Letusan Gunung Berapi, Gempa bumi, tsunami, dan tanah longsor. Antisipasi yang dilakukan: disiapkan informasi peta titik rawan gerakan tanah & gempa bumi, status gunung api serta Satgas Tanggap Darurat.
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
5
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
BAB II
PARAMETER PENGAMANAN PASOKAN
6
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
2.1 UPAYA PERTAMINA DALAM MENGAMANKAN PASOKAN BBM DAN LPG
2.1 UPAYA PERTAMINA DALAM MENGAMANKAN PASOKAN BBM DAN LPG MENGHADAPI MENGHADAPI IDUL FITRI 1438 H/2017 M IDUL FITRI 1438 H/2017 M
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
8
7
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
2.2. PREDIKSI STOK BBM DAN LPG PERIODE RAMADHAN DAN IDUL FITRI 1438 H (10 Juni 2017 - 11 Juli 2017) ESTIMASI PEMAKAIAN BBM DAN LPG PADA MASA SATGAS IDUL FITRI 1438 H : •
Premium naik 5% dari rata-rata harian normal 38.231 KL menjadi 40.142 KL.
•
Pertalite naik 15% dari rata-rata harian normal 39.248 KL menjadi 45.135 KL.
•
Pertamax naik 10% dari rata-rata harian normal 17.407 KL menjadi 19.147 KL.
•
Solar turun 9% dari rata-rata harian normal 35.760 KL menjadi 32.541 KL.
•
Dexlite naik 10% dari rata-rata harian normal 702 KL menjadi 842 KL.
•
Dex naik 10% dari rata-rata harian normal 455 KL menjadi 500 KL.
•
Minyak Tanah naik 3% dari rata-rata harian normal 1.609 KL menjadi 1.657 KL.
•
Avtur naik 6% dari rata-rata harian normal 14.079 KL menjadi 14.992 KL.
•
LPG naik 8% dari rata-rata harian normal 22.200 MT menjadi 23.980 MT.
PROYEKSI RATA-RATA STOK PADA PERIODE SATGAS (10 JUNI 2017 - 11 JULI 2017) YAITU : • • • • • • •
8
Premium 1.253.443 KL (23 hari), Pertalite 1.137.822 KL (20 hari), Pertamax 740.926 KL (22 hari). Minyak Solar 1.887.540 KL (27 hari). Dex 21.620 KL (32 hari), Avtur 374.641 KL (26 hari). LPG 326.371 MT (16 hari).
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
PREDIKSI STOK BBM DAN LPG PERIODE RAMADHAN DAN IDUL FITRI 1438 H
PREDIKSI STOK BBM DAN LPG PERIODE RAMADHAN DAN IDUL FITRI 1438 H (10 Juni 2017 - 11 Juli 2017) (10 Juni 2017 - 11 Juli 2017) 23.0 22.5 22.0
H A R I
21.5 21.0 20.5
Rata-rata selama masa satgas = 22 hari
20.0
Cov Days
19.5 19.0 18.5
PREMIUM IDUL FITRI
23.5 23.0
H A R I
22.5 22.0 21.5 21.0 20.5
Rata-rata selama masa satgas = 22 hari
20.0 19.5
15-Jul
14-Jul
13-Jul
12-Jul
11-Jul
10-Jul
09-Jul
08-Jul
07-Jul
06-Jul
05-Jul
04-Jul
03-Jul
02-Jul
01-Jul
30-Jun
29-Jun
28-Jun
27-Jun
26-Jun
25-Jun
24-Jun
23-Jun
22-Jun
21-Jun
20-Jun
19-Jun
18-Jun
17-Jun
16-Jun
15-Jun
14-Jun
13-Jun
12-Jun
11-Jun
10-Jun
09-Jun
08-Jun
07-Jun
06-Jun
PERTAMAX 05-Jun
19.0
Cov Day Ideal Max Min
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
10
9
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
PREDIKSI STOK BBM DAN LPG PERIODE RAMADHAN DAN IDUL FITRI 1438 H
PREDIKSI STOK BBM DAN LPG PERIODE RAMADHAN DAN IDUL FITRI 1438 H (10 Juni 2017 - 11 Juli 2017) (10 Juni 2017 - 11 Juli 2017) 76.0 74.0 72.0 70.0 68.0
64.0
IDUL FITRI
15-Jul
14-Jul
13-Jul
12-Jul
11-Jul
10-Jul
09-Jul
08-Jul
07-Jul
06-Jul
05-Jul
04-Jul
03-Jul
02-Jul
01-Jul
30-Jun
29-Jun
28-Jun
27-Jun
26-Jun
25-Jun
24-Jun
23-Jun
22-Jun
21-Jun
20-Jun
19-Jun
18-Jun
17-Jun
16-Jun
15-Jun
14-Jun
13-Jun
12-Jun
11-Jun
10-Jun
SOLAR
09-Jun
Rata-rata selama masa satgas = 28 hari
05-Jun
30.0 29.0 28.0 27.0 26.0 25.0 24.0 23.0 22.0 21.0 20.0
08-Jun
60.0
Rata-rata selama masa satgas = 68 hari
KEROSENE
07-Jun
62.0
H A R I
Cov Days
66.0
06-Jun
H A R I
Cov Day Ideal Max Min
10
11 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
PREDIKSI STOK BBM DAN LPG PERIODE RAMADHAN DAN IDUL FITRI 1438 H PREDIKSI STOK BBM DAN LPG PERIODE RAMADHAN DANJuli IDUL FITRI 1438 H (10 Juni 2017 - 11 2017) (10 Juni 2017 - 11 Juli 2017)
Cov. Days
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
11 12
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
PREDIKSI STOK BBM DAN LPG PERIODE RAMADHAN DAN IDUL FITRI 1438 H
PREDIKSI STOK BBM DAN LPG PERIODE RAMADHAN DAN IDUL FITRI 1438 H (10 Juni 2017 - 11 Juli 2017) (10 Juni 2017 - 11 Juli 2017) Rencana Mei 2017 = Coverage Days 16.87 hari; Stok harian = 333.146 MT Rencana Juni 2017 = Coverage Days 15.15 hari; Stok harian = 312.124 MT 18
Hari H Lebaran
16 14
Coverage Days
12
Stok Minimum = 11 hari
10 8 6
Rata2 Estimasi DOT Suplai Mei 2017 = 22.334 MT/day Juni 2017 = 23.322 MT/day
4 2 0 1
2
3
4
5
6
7
8
9
10
11
12
01 Juni 2017
13
14
15
16
JUNI 2017
17
18
19
20
21
22
23
24
25
26
27
28
29
30
30 Juni 2017
Catatan : - Mengacu pada Permen ESDM 26 / 2009 tentang Penyediaan dan Pendistribusian LPG ketahanan stok LPG minimum 11 (sebelas) hari - Ketahanan Stock SP(P)BE 1 – 1.5 hari
12
13 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
2.3 Estimasi Peningkatan Konsumsi 2017 vs Realisasi 2016
2.3 Estimasi Peningkatan Konsumsi 2017 vs Realisasi 2016
Prediksi realisasi BBM
Realisasi BBM
Lebaran 2017
Lebaran 2016
PREMIUM -7% N: 70.566 S:65.708
PERTALITE +40% N: 10.063 S: 14.503
PERTAMAX +30% N: 11.257 S : 14.560 DEX +40% N: 312 S: 436
AVTUR +4% N: 12.500 S: 13.000
SOLAR/BIO -16% N: 35.319 S :29.665
KEROSENE -2% N: 1.634 S :1.679
LPG +5,5% N: 20.278 S: 22.604
• Prediksi berdasarkan trend penjualan dan realisasi Jan. Maret Konsumsi Gasoline (Premium + Pertamax Series) akanmengalami kenaikan 9,7% dibanding harian normal. • Prediksi Gasoil (Solar/Bio + Pertamina Dex series) akan mengalami penurunan -8,2% dibanding harian normal, namun bila dibandingkan dengan konsumsi masa mudik 2016 terjadi kenaikan sebesar 12,7%. • Penurunan prediksi 2017 lebih rendah 2016 dikarenakan padalebaran 2016 terjadi kondisi awal peralihan konsumsi dari produk PSO ke Pertamax series sehingga kenaikan sangat signifikan. PREMIUM +5% N: 38.231 S: 40.142
PERTAMAX +10% N: 17.407 S : 19.147
AVTUR +6% N: 14.079 S: 14.992
Keterangan : N : Konsumsi Normal S : Konsumsi Satgas lebaran Angka dalam Kiloliter per hari
PERTALITE +15% N: 39.248 S: 45.135
DEX +10% N: 455 S: 500
LPG +8% N:22.200 S:23.980
SOLAR/BIO -9% N: 35.760 S :32.541
KEROSENE +3% N: 1.609 S: 1.657
DEXLITE +10% N: 702 S: 842 14
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
13
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
2.4KONSUMSI ESTIMASI PENINGKATAN KONSUMSI AVTUR 2.4 ESTIMASI PENINGKATAN AVTUR Lonjakan konsumsi avtur diperkirakan mulai terjadi pada H-15 dan H+15 lebaran. Puncaknya diperkirakan pada H-2, mengingat Idul Fitri jatuh pada hari Minggu. Estimasi Sales Idul Fitri 1438 H (H-15 s/d H+15)
14
Produk
DOT Normal
Estimasi Lebaran
Est kenaikan (%)
Avtur
14,079
14,992
106.5%
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
15
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
2.5 ESTIMASI PENINGKATAN KONSUMSI BBM
2.5 ESTIMASI PENINGKATAN KONSUMSI BBM
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
16
15
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
2.6 ESTIMASI PENINGKATAN KONSUMSI LPG
2.6 ESTIMASI PENINGKATAN KONSUMSI LPG
30,000
KETERANGAN Proyeksi konsumsi LPG selama masa satgas Ramadhan dan Idul Fitri 2017 (H-15 sd H+15): -Demand diperkirakan 23.835 MT/day (peningkatan 107.5% dari DOT Normal). Angka ini naik 5.5% dari realisasi Satgas Idul Fitri 2016. -Perkiraan puncak demand harian pada H-6 sd H-1 sebesar 25.530 MT/day (±115% dari DOT normal) -Total estimasi demand bulan Mei 2017 = 618.290 MT, Juni 2017 =617.712 MT
25,000 20,000 15,000
+5.5%
22,604
+7.5%
23,835 22,200
10,000 5,000 -
LPG Satgas 2016 Proyeksi Satgas 2017
DOT Normal 2017
17
16
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
17
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
BAB III
UPAYA PENGAMANAN PASOKAN BBM DAN LPG
18
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
3.1. DUKUNGAN YANG DIPERLUKAN DARI INSTANSI DAN APARAT PEMERINTAH 1. Dukungan dari Kepolisian terkait langkah pengamanan terhadap pelaksanaan pendistribusian BBM & LPG, dimana pada masa puncak arus mudik mengakibatkan kemacetan : • Dispensasi Terhadap Mobil Angkutan BBM dan LPG selama masa Mudik Lebaran 2. Dukungan dari Kepolisian terhadap Objek Vital penyaluran BBM & LPG a.l : Instalasi, Terminal BBM, SPBU, dan SP(P)BE termasuk Jalur Supply Kilang ke Terminal BBM dan antar Terminal BBM : • Keamanan jalur KA untuk angkutan BBM via RTW • Keamanan jalur Pipa untuk angkutan BBM via Pipa 3. Diperlukan dukungan DLLAJR dan satgas Badan Geologi untuk mengantisipasi kendala di : • Daerah-daerah rawan macet dan longsor • Daerah perbaikan jalan (jalan rusak) • Area Keluar/masuk Lokasi Terminal BBM/DPPU • Area Keluar/masuk Lokasi SPBU kantong/SPBE
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
19
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
3.2 PREDIKSI MUDIK DAN2017 BALIK LEBARAN 2017 3.2 PREDIKSI MASA PUNCAK MASA MUDIK PUNCAK DAN BALIK LEBARAN Estimasi Puncak Arus Mudik
Estimasi Puncak Arus Balik
Hari H
Senin
Selas
Rabu
Kamis Jum’at Sabtu Minggu Senin Selasa Rabu Kamis Jum’at Sabtu Minggu Senin
19-Jun 20-Jun 21-Jun 22-Jun 23-Jun 24-Jun 25-Jun 26-Jun 27-Jun 28-Jun 29-Jun 30-Jun 1-Jul 2-Jul H-6
H-5
H-4
H-3
H-2
H-1
H1
H2
H+1
H+2
H+3
H+4
H+5
H+6
3-Jul H+7
PNS Mulai Masuk kerja
20
20 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
3.3 JALUR RAWAN KEMACETAN DAN KEPADATAN LALU LINTAS Jalur WISATA
Jalur Mudik Sumatera • • • • •
Jalur Medan – Brastagi Lintastengah dan lintas Timur Lampung Jalur Baturaja – lahat – Lubuk Linggau Jalur Jambi hingga ke Padang Jalur Pekanbaru – Padang Ke Bukittinggi
• • • • •
Anyer Carita Kuningan Pelabuhan Ratu Ciater
• • • •
Lembang Pangandaran Batu/Malang Bali
Jalur Mudik Jawa • • • • • • • • • • • • •
Jalur Jakarta – Puncak Bogor Jalur Jakarta – Cikampek (Simpang Jomin) Jalur Tol Cikampek – Palimanan Jalur Loh Bener - Losari Jalur Tol Pejagan – Brebes Timur Jalur Pekalongan - Batang Jalur Limbangan – Nagrek Jalur Ciawi – Pertigaan Pamoyaman sampai Gentong Jalur Jogja – Ungaran – Semarang Jalur Malang – Madiun – Kediri Jalur Jembatan Suramadu Jalur Ketapang - Gilimanuk Jalur Merak
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
21
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
3.4 PERMASALAHAN PENYALURAN BBM PADA MASA LEBARAN 2017
1. Terjadinya Peningkatan Konsumsi BBM yang sangat signifikan pada puncak mudik Lebaran. Tahun ini diperkirakan pada puncak arus mudik mencapai 31% dari DOT 2. Terjadinya kemacetan total pada beberapa ruas jalur mudik utama seperti Jalur Tol Jakarta – Cikampek hingga Jalur Tol Pejagan - Pemalang di jalur pintu keluar tol Brebes Timur, sehingga menghambat mobilitas mobil tangki Pertamina dalam menyalurkan BBM ke SPBU. 3. Petugas Pangkalan LPG yang melakukan Mudik lebaran, sehingga beberapa pangkalan LPG tidak beroperasi. 4. Terjadinya kemacetan di beberapa jalur mudik, sehingga akan mengganggu distribusi LPG ke berbagai daerah.
22
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
3.5 UPAYA PERTAMINA DALAM MENGAMANKAN PASOKAN BBM DAN LPG
1. Membentuk Posko Satgas BBM dan LPG di kantor pusat dan daerah 2. Monitoring kelancaran distribusi BBM (penambahan armada mobil tangki, penyiapan kantong BBM, terminal BBM, penyiapan produk BBK dalam kemasan, penyiapan jalur contra flow) 3. Monitoring ketahanan stok BBM dan LPG Nasional 4. Monitoring layanan di lembaga penyalur mulai dari safety, kehandalan dan kebersihan fasilitas, pelayanan maksimal sesuai standar, serta pelayanan 24 Jam (jika diperlukan) di lembaga penyalur pada Jalur Mudik 5. Koordinasi dengan berbagai pihak dan instansi seperti TNI, POLRI, Dinas Perhubungan dan instansi lainnya dalam menjaga keamanan dan kelancaran penyaluran BBM.
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
23
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
3.6 PERMASALAHAN PENYALURAN LPG PADA MASA LEBARAN 2017
1. Terjadinya Peningkatan Konsumsi LPG yang signifikan pada Bulan Puasa dan Lebaran. Tahun ini diperkirakan penyaluran LPG pada masa H-6 s.d H-1 menjelang lebaran mencapai 115% diatas DOT 2. Terjadinya kemacetan di beberapa jalur mudik, sehingga mengganggu distribusi LPG ke berbagai daerah. 3. Menjelang lebaran, rumah tangga seringkali mengalami kesulitan mendapatkan LPG karena toko-toko penyalur tutup akibat mudik.
24
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
3.7 UPAYA MENGATASI KELANGKAAN LPG 1.
Membentuk Posko Satgas BBM dan LPG di Kantor Pusat dan seluruh Kantor MOR (Marketing & Operation Region) Pertamina
2.
Close-Monitoring stok LPG secara nasional melalui dan menjaga ketahanan stok LPG Nasional dengan pengaturan jadwal suplai baik domestik maupun kapal impor.
3.
Menambah armada Mobil Tanki LPG dan waktu operasional Depot dan SP(P)BE jika diperlukan
4.
Menyiapkan Kantong LPG yaitu mobil skidtank (isi LPG) stand by di SPBE yang berada di jalur rawan kemacetan total yang berfungsi sebagai back up penyaluran
5.
Pertamina memastikan ketersediaan ELPIJI 3 kg sesuai kuota dan kebutuhan masyarakat, serta menyediakan produk LPG Non Subsidi yaitu ELPIJI 12 kg dan Bright Gas di lokasi dan SPBU strategis yang berpotensi mengalami peningkatan konsumsi
6.
Melakukan stock built-up di lembaga penyalur LPG (Agen dan Pangkalan), termasuk memastikan ketersediaan penebusan LPG dari lembaga penyalur serta menunjuk Agen dan Pangkalan Siaga yang tetap melayani di hari Libur.
7.
Meningkatkan pelayanan di lembaga penyalur mulai dari safety, kehandalan dan kebersihan fasilitas, pelayanan maksimal sesuai standar Pertamina Way LPG, serta pelayanan 24 Jam (jika diperlukan) di Lembaga Penyalur pada Jalur Mudik .
8.
Membentuk jalur koordinasi Satgas dengan mitra penyalur dan SPPBE melalui Hiswana Migas di tiap lokasi.
9.
Koordinasi dengan berbagai pihak dan instansi seperti POLRI, TNI, Dinas Perhubungan, Badan Geologi dan instansi lainnya dalam menjaga keamanan dan kelancaran penyaluran BBM.
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
25
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
BAB IV
KESIAPAN PENYEDIAAN TENAGA LISTRIK
26
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
4.1 KONDISI KELISTRIKAN PADA BULAN MEI 2017 1. Kondisi pasokan tenaga listrik sampai dengan bulan April 2017 pada umumnya berada pada kondisi siaga dengan beberapa subsistem berada pada kondisi normal dan beberapa subsistem masih berada pada posisi defisit daya. Pengertian sistem dalam kondisi siaga adalah tidak ada pemadaman dan cadangan operasi lebih kecil dari unit yang terbesar. 2. Berdasarkan pengalaman selama ini, beban puncak pada hari raya Lebaran pada umumnya lebih rendah dibandingkan dengan beban puncak pada kondisi hari kerja (proyeksi berkurang sekitar 10-20%, untuk Jawa Bali berkurang sekitar 30%) dikarenakan pada hari tersebut industri yang mengkonsumsi tenaga listrik yang sangat besar dan perkantoran berhenti beroperasi (libur). 3. Prakiraan kondisi pasokan tenaga listrik selama periode Lebaran 2017 (H-15 s.d. H+15) pada Sistem Kelistrikan Jawa-Bali, Sumatera dan Indonesia Timur berada pada kondisi “pasokan cukup”.
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
27
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
4.2 KONDISI SISTEM KELISTRIKAN BULAN MEI 2017 4.2 KONDISI SISTEM KELISTRIKAN NASIONAL BULAN MEINASIONAL 2017 No
Wilayah
1
P3BS
Sistem SBU Sumut Aceh SBST SBS S2B Lampung SBT
2 3 4 5 6 7 8 9 10 11 12 13 14
Sumbar Riau Jambi KEPRI Tanjung Pinang BATAM Batam Bangka BABEL Belitung KALBAR Kalbar KALTIM Kaltim KSKT Kalselteng SulutGo SULUTTENGGO Palu Sulawesi Selatan + PosoSULSELRABAR Tentena Kendari Ambon M2U Ternate + Maluku Isolated Jayapura PAPUA Sorong + Papua Isolated Lombok NTB Bima dan Sumbawa Kupang NTT NTT Isolated Jawa Bali Jawa & Bali Catatan :
28
- NORMAL - SIAGA - DEFISIT
Daya Mampu Pasok (MW) 1.833,10 1.602,80 230,30 3.056,95 1.894,23 1.310,65 583,58 1.162,72 389,80 412,40 360,52 30,40 435,90 149,96 57,66 460,9 589,10 688,05 428,13 119,71
1.822,97 1.475,09 347,88 3.041,70 1.661,43 803,85 857,58 1.380,27 537,75 558,40 284,12 57,62 288,90 114,41 34,36 371,29 476,88 574,73 334,18 118,92
1.150,15 80,90 102,35 109,07 84,00 187,85 245,79 90,20 96,31 91,06 24.580,55
Beban Puncak (MW)
Terima (MW)
Kirim (MW)
Cadangan Operasi (MW)
Keterangan
10,13 9,71 0,42 15,25 14,80 14,80 0,00 0,45 0,05 0,00 0,40 18,40 101,38 35,55 23,30 89,65 112,22 113,32 93,95 0,79
0,56 Siaga 0,66 Kirim ke Aceh dan Riau 0,12 Terima dari Sumut 0,50 Siaga 0,89 Siaga 1,84 Kirim ke Lampung dan ke Jambi 0,00 Terima dari S2B 0,03 Siaga 0,01 Terima dari Jambi dan Kirim ke Riau 0,00 Terima dari Sumbar dan Sumut 0,14 Terima dari S2B dan Kirim ke Sumbar 31,93 Normal 35,09 Normal 31,07 Normal 67,80 Normal 24,15 Normal 23,53 Normal 19,72 Normal 28,11 Normal 0,66 Siaga
934,09
216,06
23,13
Normal
74,30 52,80 94,12 69,30 166,51 209,07 78,28 70,50 81,49 22.687,47
6,60 49,55 14,95 14,70 21,34 36,72 11,92 25,81 9,57 1.893,08
8,88 93,84 15,88 21,21 12,82 17,56 15,23 36,61 11,74 8,34
Siaga Normal Normal Siaga Siaga Normal Siaga Normal Normal Normal
0,00 118,00
118,00 0,00
0,00 274,00
492,00 0,00
294,00 146,00 218,00 45,62 0,00
146,00 0,00 294,00 0,00 45,62
: tidak ada pemadaman, cadangan operasi > unit terbesar; : tidak ada pemadaman, cadangan operasi < unit terbesar; : potensi pemadaman sebagian pelanggan (secara bergilir)
www.esdm.go.id
@KementerianESDM
28
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
4.3. PROGNOSA KONDISI SISTEM KELISTRIKAN PADA IDUL FITRI 1438 H (25 JUNI 2017) 4.3. PROGNOSA KONDISI SISTEM KELISTRIKAN PADA IDUL FITRI 1438 H (25 JUNI 2017) No 1
Wilayah P3BS
Daya Mampu Beban Puncak Terima Pasok (MW) (MW) (MW)
Sistem SBU Sumut Aceh SBST SBS S2B Lampung SBT
2
KEPRI
3
BATAM
4
BABEL
5 6
KALBAR KALTIM
7
KSKT
Sumbar Riau Jambi Tanjung Pinang Batam Bangka Belitung Kalbar Kaltim Kalselteng
8
SULUTTENGGO SulutGo
9
SULSELRABAR
10
M2U
11
PAPUA
12
NTB
13
NTT
14
Jawa Bali
Sulawesi Selatan Kendari Ambon Ternate + Maluku Isolated Jayapura
1.989,10 1.711,31 277,79 3.669,69 2.266,99 1.579,57 687,42 1.402,69 430,06 603,13 369,50 49,00 477,00 168,40 65,35 684,28 814,88 670,01 458,80 1.237,30 83,50 109,73
Catatan :
255,00 90,00
90,00 0,00
570,00 320,00 450,00 100,00 420,00 35,00 0,00
300,00 55,00 450,00 0,00 35,00
302,27 924,00 78,00 56,85
Cadangan % Cadangan Operasi (MW) 741,58 659,26 82,31 956,61 571,55 299,99 271,56 385,06 125,47 179,78 79,81 34,00 158,71 46,10 31,55 280,24 244,25 92,27 156,53 313,30 5,50 52,88
118,85
99,66
19,19
90,00
68,03
21,97
187,75
166,27
21,48
283,30 112,80 126,90 99,90 28.884,45
199,70 86,78 89,57 68,25 16.462,38
83,60 26,02 37,33 31,65 12.422,07
Sorong + Papua Isolated Lombok Bima dan Sumbawa Kupang NTT Isolated Jawa & Bali
1.502,52 1.217,04 285,48 2.628,08 1.445,44 709,58 735,86 1.182,64 454,59 468,35 259,69 50,00 283,29 122,30 33,80 404,03 570,63 577,74
Kirim (MW)
- NORMAL - SIAGA - DEFISIT
Keterangan
Normal 49,36 54,17 Kirim ke Aceh dan Riau 28,83 Terima dari Sumut 36,40 Normal 39,54 42,28 Kirim ke Lampung dan ke Jambi 36,90 Terima dari S2B Normal 32,56 27,60 Terima dari Jambi dan Kirim ke Riau 38,39 Terima dari Sumbar dan Sumut 30,73 Terima dari S2B dan Kirim ke Sumbar Normal 68,00 Normal 56,02 Normal 37,69 Normal 93,34 Normal 69,36 Normal 42,80 Normal 15,97 Normal 51,78 Normal 33,91 Siaga 7,05 Normal 93,02 19,26 32,29 12,92 41,86 29,98 41,68 46,37 75,46
Normal Siaga Siaga Normal Normal Normal Normal Normal
: tidak ada pemadaman, cadangan operasi > unit terbesar; : tidak ada pemadaman, cadangan operasi < unit terbesar; : potensi pemadaman sebagian pelanggan (secara bergilir)
29
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
29
(25
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
4.4. PROGNOSA KONDISI SISTEM KELISTRIKAN PADA IDUL FITRI 1438 H (26 JUNI 2017) 4.4. PROGNOSA KONDISI SISTEM KELISTRIKAN PADA IDUL FITRI 1438 H (26 JUNI 2017) No 1
Wilayah P3BS
Sistem SBU Sumut Aceh SBST SBS S2B Lampung SBT
Sumbar Riau Jambi 2 KEPRI Tanjung Pinang 3 BATAM Batam Bangka 4 BABEL Belitung 5 KALBAR Kalbar 6 KALTIM Kaltim 7 KSKT Kalselteng 8 SULUTTENGGO SulutGo Sulawesi Selatan 9 SULSELRABAR Kendari Ambon 10 M2U Ternate + Maluku Isolated Jayapura 11 PAPUA Sorong + Papua Isolated Lombok 12 NTB Bima dan Sumbawa Kupang 13 NTT NTT Isolated 14 Jawa Bali Jawa & Bali
Daya Mampu Beban Puncak Terima Pasok (MW) (MW) (MW) 1.979,77 1.711,31 268,46 3.669,69 2.266,99 1.579,57 687,42 1.402,69 430,06 603,13 369,50 49,00 477,00 168,40 65,35 684,28 815,68 670,01 458,80 1.237,30 83,70 109,73
1.430,88 1.159,01 271,87 2.761,37 1.518,75 745,57 773,18 1.242,61 477,65 492,10 272,86 55,00 284,47 121,93 35,23 403,59 569,63 580,91 304,09 1.009,00 79,10 56,85
Kirim (MW)
255,00 90,00
www.esdm.go.id
90,00 0,00
570,00 320,00 450,00 100,00 420,00 35,00 0,00
300,00 55,00 450,00 0,00 35,00
803,90 717,30 86,60 823,32 498,24 264,00 234,24 325,08 102,41 156,03 66,64 29,00 157,53 46,47 30,12 280,68 246,05 89,10 154,71 228,30 4,60 52,88
118,85
99,66
19,19
90,00
68,03
21,97
187,75
166,27
21,48
283,30 112,80 126,90 99,90 28.990,25
199,70 79,38 79,32 65,48 16.785,18
83,60 33,42 47,58 34,42 12.205,07 Catatan :
30
Cadangan % Cadangan Operasi (MW)
@KementerianESDM
- NORMAL - SIAGA - DEFISIT
Keterangan
Normal 56,18 61,89 Kirim ke Aceh dan Riau 31,85 Terima dari Sumut 29,82 Normal 32,81 35,41 Kirim ke Lampung dan ke Jambi 30,30 Terima dari S2B Normal 26,16 21,44 Terima dari Jambi dan Kirim ke Riau 31,71 Terima dari Sumbar dan Sumut 24,42 Terima dari S2B dan Kirim ke Sumbar Normal 52,73 Normal 55,38 Normal 38,11 Normal 85,50 Normal 69,55 Normal 43,20 Normal 15,34 Normal 50,87 Normal 22,63 Siaga 5,82 Normal 93,02
19,26 32,29 12,92 41,86 42,10 59,98 52,57 72,71
Normal Siaga Siaga Normal Normal Normal Normal Normal
: tidak ada pemadaman, cadangan operasi > unit terbesar; : tidak ada pemadaman, cadangan operasi < unit terbesar; : potensi pemadaman sebagian pelanggan (secara bergilir)
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
30
@kesdm
5 JUNI 2017)
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
4.5. KONDISI PENYEDIAAN TENAGA LISTRIK PADA IDUL FITRI 1438 H (25 JUNI 2017)
No.
Regional
Daya Mampu (MW)
Beban Puncak (MW)
Cadangan Operasi (MW)
1
Jawa Bali
28.884,45
16.462,38
12.422,07
2
Sumatera
6.418,54
4.620,00
1.968,54
3
Indonesia Timur
5.078,00
3.691,79
1.386,21
4
Indonesia
40.380,99
24.744,17
15.776,82
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
31
31
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
4.6. UPAYA PENGAMANAN PASOKAN LISTRIK 1. Menghimbau masyarakat pelanggan PLN agar tetap menjalankan “gerakan hemat listrik”, untuk tidak berlebihan menggunakan listrik ; 2. Untuk meningkatkan kesiagaan menjaga Keandalan dan Kualitas Pasokan Listrik, semua Unit Menyiapkan Pedoman Operasi Khusus Lebaran 2017; 3. Tidak melakukan pekerjaan/pemeliharaan yang dapat mengganggu pasokan listrik pada H-15 s/d H+15 kecuali pekerjaan perbaikan yang disebabkan gangguan; 4. Meningkatkan koordinasi operasi antara Unit Pembangkit, Penyaluran dan Distribusi untuk mengoptimalkan kesiagaan dan kesiapan instalasinya, sehingga dapat memperkecil kemungkinan terjadinya gangguan pelayanan; 5. Meningkatkan koordinasi dengan aparat terkait untuk menjaga keamanan instalasi; 6. Apabila terjadi gangguan yang mengakibatkan kondisi defisit daya, akan diusahakan agar dampak sosial ke masyarakat minimum; 7. Untuk sistem kelistrikan dengan status siaga akan diupayakan dengan Captive Power.
32
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
33
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
BAB V
KESIAPAN MENGHADAPI BENCANA GEOLOGI
34
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
5.1. ANTISIPASI BENCANA GEOLOGI 1. Pada masa liburan hari besar keagamaan seperti Idul Fitri, Natal dan Tahun Baru, biasanya jumlah pengunjung ke daerah wisata alam melonjak tajam, antara lain ke daerah wisata gunungapi dan kawasan pantai; 2. Intensitas curah hujan pada bulan Juni 2017 di beberapa wilayah (Sumatera Utara, Sumatera Barat, Lampung, sebagian Jawa Barat, sebagian Jawa Tengah bagian selatan, Sulawesi Selatan dan NTT bagian barat) menunjukan adanya tanda-tanda peningkatan, oleh karena itu perlu diwaspadai potensi terjadinya gerakan tanah/longsor di jalur jalan dan zona lainnya yang termasuk ke dalam zona kerentanan gerakan tanah menengah hingga tinggi; 3. Potensi bencana geologi seperti letusan gunungapi, gempabumi, tsunami dan tanah longsor dapat terjadi di beberapa kawasan rawan bencana geologi. 4. Informasi kawasan rawan bencana geologi telah kami sampaikan kepada Pemerintah Daerah.
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
35
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
5.2. UPAYA ANTISIPASI BENCANA GEOLOGI • •
•
•
•
36
www.esdm.go.id
Upaya yang dilakukan untuk meningkatkan kewaspadaan dan kesiapsiagaan dalam kejadian bencana geologi, antara lain : Membentuk Tim Tanggap Darurat Bencana Geologi yang akan merespon dengan cepat setiap bencana yang terjadi dan siaga dalam waktu 24 jam, dan meningkatkan pemantauan gunungapi secara cermat di beberapa gunungapi aktif yang sering digunakan untuk mengisi acara liburan. Memberikan Peta Sebaran Titik Rawan Gerakan Tanah pada jalur jalan di Pulau Jawa, Pulau Sumatera dan Sulawesi Utara kepada Pemda dan Polda di wilayah tersebut. Membuat Peta Prakiraan Wilayah Potensi Terjadi Gerakan Tanah, peta ini di perbaharui tiap akhir bulan dan di sebarkan ke Pemda dan dapat juga diunduh di www.bgl.esdm.go.id atau www.magma.vsi.esdm.go.id Membuat laporan/tanggapan dan rekomendasi teknis penanggulangan bencana geologi (letusan gunungapi, gempabumi, tsunami, dan gerakan tanah). Laporan disampaikan kepada Pemerintah Pusat, Pemda, Badan Nasional Penanggulangan Bencana (BNPB) dan dinas terkait yang menangani kebencanaan geologi.
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
5.3. KLASIFIKASI GUNUNG API
5.3. KLASIFIKASI GUNUNG API Tipe gunung api 1.Tipe A
Sumatera 12
Burnitelong, Seulawah Agam, Peut Saoue, Sinabung,Sorik Marapi, Marapi, Tandikat, Talang, Kerinci, Sumbing, Kaba, Dempo, Anak-Krakatau.
2. Tipe B
Salak, Gede, Tangkuban Parahu, Cereme, Guntur, Papandayan,Galunggung, Slamet, Dieng-Butak Petarangan-Timbang, Sundoro, Sumbing, Merapi, Kelud, ArjunoWelirang, Bromo, Semeru, Lamongan, Ijen, Raung
10
6
30
Pulau Weh, Gayolesten, Helatobi-Tarutung, Marga Bayur, Pematang Bata, Hulu Belu
Jumlah Gunungapi
19
12
Bur Ni Geureudong, Sibayak, Pusuk Bukit,BualBuali, Talakmau, Kunyit, Belerang-Beriti,Bukit Daun, Lumut-Balai, Sekincau Belirang, RajaBasa, Sumbing
3. Tipe C
Jawa
Bali- Nusa Tenggara 22
Batur, Agung, Rinjani,Tambora, Sangeangapi, anak Ranakah,Inerie, Inelika, Ebulobo, Kelimutu,Rokatenda, Iya, Egon,Lewotobi laki-laki, Lewotobi Prempuan, Lereboleng, Ileboleng, Batu Tara, Lewotolo, Ile Werung, Hobal, Sirung
Sulawesi 11
Awu, Submarin 1922, Banuawuhu, Karangetang, Ruang, Tangkoko,Mahawu, Lokon-Empung, Soputan, Ambang Colo
Maluku 12
Dukono-Malupang Warirang, Ibu, Gamkonora,Gamalama, Kie Besi
jumlah 76
Banda-api, Nieuwerkerk, Wetar, Serwena Leworkawra, Legatala, Wurlali
3
3
2,
30
5
5
5
-
21
34
30
19
14
127
Pulosari,Karang, Patuha, Wayang-Windu, Talaga Bodas, Merbabu,Ungaran, Lawu, Wilis, Iyang Argopura
Kiara BeresGagak,Perbakti, Kawah Manuk, Kawah Kamojang, Kawah Karaha
, Ile Muda , Labalekan, Yersey
Wai Sano, Poco Leak, Sukaria, Ndetu Napi, Riang Kotang
Sempu, Klabat, Todoko,
Batu Kolok- Tempang, Tompasu, Lahendong, Sarongsong
Emperor of China, Manuk
Tipe-A, gunungapi yang pernah mengalami erupsi magmatik sekurang-kurangnya satu kali sesudah tahun 1600. Tipe-B, gunungapi yang sesudah tahun 1600 belum lagi mengalami erupsi magmatik, namun masih memperlihatkan gejala kegiatan seperti kegiatan solfatara. Tipe-C, gunungapi yang erupsinya tidak diketahui dalam sejarah manusia, namun masih terdapat tandatanda kegiatan masa lampau berupa lapangan solfatara/fumarola pada tingkat lemah.
36 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
37
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
5.4. PETA SEBARAN GUNUNGAPI 5.4. INDONESIA PETA SEBARAN GUNUNGAPI INDONESIA
Gunungapi Tipe A dalam tingkat aktivitas AWAS (Level IV)
38
37 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
5.5. STATUS KEGIATAN GUNUNG API DIGUNUNG ATAS NORMAL APRIL 2017 5.5. STATUS KEGIATAN API DIs/d ATAS12NORMAL s/d 12 APRIL 2017 NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
GUNUNGAPI Sinabung (Prov. Sumatera Utara) Dempo (Prov. Sumatera Selatan) Banda Api (Prov. Maluku) Bromo (Prov. Jawa Timur) Rinjani (Prov. Nusa Tenggara Barat) Lokon (Prov. Sulawesi Utara) Soputan (Prov. Sulawesi Utara) Karangetang (Prov. Sulawesi Utara) Gamalama (Prov. Maluku Utara) Sangeangapi (Prov. Nusa Tenggara Barat) Rokatenda (Prov. Nusa Tenggara Timur) Ibu (Prov. Maluku Utara) Gamkonora (Prov. Maluku Utara) Semeru (Prov. Jawa Timur) Anak Krakatau (Prov. Lampung) Marapi (Prov. Sumatera Barat) Dukono (Prov. Maluku Utara) Kerinci (Prov. Jambi)
TINGKAT AKTIVITAS
TERHITUNG TANGGAL
Awas Waspada Waspada Waspada Waspada Waspada Waspada Waspada Waspada Waspada Waspada Waspada Waspada Waspada Waspada Waspada Waspada Waspada
2 Juni 2015 5 April 2017 5 April 2017 20 Oktober 2016 27 September 2016 22 Agustus 2016 21 April 2016 16 Maret 2016 10 Maret 2015 17 Juni 2014 7 April 2014 10 Desember 2013 1 Juli 2013 2 Mei 2012 26 Januari 2012 3 Agustus 2011 15 Juni 2008 9 September 2007
URUTAN TINGKAT AKTIVITAS GUNUNGAPI DARI TERENDAH KE TERTINGGI: NORMAL (LEVEL I) – WASPADA (LEVEL II) – SIAGA (LEVEL III) – AWAS (LEVEL IV)
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
3839
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
BAB VI
POSKO, WEBSITE DAN EMAIL
40
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
6.1. JADWAL POSKO H-15 s.d. H+15 IDUL FITRI 1438 H
Kantor Pusat (08.00 S/D 20.00 WIB) • Kementerian ESDM • Kantor Pusat PT. Pertamina (Persero) Kantor Perwakilan (24 Jam) • Badan Geologi (Bandung) • BPH Migas • PT. Pertamina Pemasaran Region I – VIII • Unit PT. PLN (Persero) di 25 Wilayah Distribusi
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
41
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
6.2. POSKO BERSAMA MENGHADAPI FITRI TAHUN 2017 M /TAHUN 1438 H2017 M / 1438 H 6.2. POSKO BERSAMAIDUL MENGHADAPI IDUL FITRI POSKO KESDM KANTOR BPH MIGAS JL. KAPTEN TENDEAN NO. 28 – JAKARTA SELATAN TELP. (021) 527 6709 FAX. (021) 522 5355 EMAIL:
[email protected]
POSKO BAHAN BAKAR
SATGAS PGN Kantor Pusat:
Jl. K.H. Zainul Arifin No. 20 Jakarta 11140, Indonesia Ph: (62-21) 633300 Toll Free : 08001500645 Email :
[email protected]
SATGAS PERTAMINA Kantor Pusat:: Jln. Medan Merdeka Timur 1A Gedung Utama, Lantai 11 Jakarta Pusat
POSKO LISTRIK
POSKO GEOLOGI
SATGAS PLN
SATGAS BADAN GEOLOGI
Tersebar di 25 Unit/Wilayah/Distribusi
Kantor Pusat Vulkanologi dan Mitigasi Bencana Geologi JL. Diponegoro 57 Bandung Telp. (022) 7272 606
CONTACT PERTAMINA 1500-000 Fax: (021) 24295333 SMS: (021) 08159500000 Email:
[email protected] RUANG POSKO CRISIS CENTER Telp : (021) 3815555 Fax : Email: satgas.pusat @pertamina.com Mailist :
[email protected]
42
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm 41
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
6.3. POSKO SATGAS LEBARAN 2017 6.3. POSKO SATGAS LEBARAN 2017 Membentuk Posko Satgas BBM dan LPG di Kantor Pusat dan seluruh Kantor Region Pertamina mulai tanggal 10 Juni s.d. 11 Juli 2017, untuk memantau dan memastikan kehandalan pasokan BBM & LPG. POSKO ESDM
SATGAS PERTAMINA KANTOR PUSAT JL. MEDAN MERDEKA TIMUR 1A GEDUNG UTAMA LT. 1
Kantor BPH Migas JL. KAPTEN TENDEAN NO. 28 JAKARTA SELATAN TELP. (021) 527 6709 FAX. (021) 522 5355 EMAIL :
[email protected]
REGION I MEDAN
CONTACT PERTAMINA
• RFM REGION : AGUS TAUFIK H. (0812 542 1002) • BRANCH NAD : ADDIEB ARSELAN (08118002900) • BRANCH SUMBAR & RIAU :
RACHMAN PRAMONO W. (0811 522 201)
• BRANCH KEPRI : DONI INDRAWAN (08127208889)
REGION V SURABAYA Telp. (031) 8405111 - Facs. (031) 8405133 E-mail :
[email protected] •RFM REGION : ASEP WICAKSONO HADI (0811 430 3639) •BRANCH BALI & NTB : I KETUT PERMADI A. (0811 1771 047) •BRANCH NTT : FANDA CHRISMIANTO (08113410529)
Telp : (021) 3815555 Fax : (021) 3511919 Email: satgas.pusat @pertamina.com Mailist :
[email protected]
Fax: (021) 24295333 SMS: (021) 08159500000 Email:
[email protected]
REGION II PALEMBANG
Telp. (061) 4551950, 4552422 ext 4401/11 Facs. (061) 4553761 E-mail :
[email protected]
RUANG PUSKODAL
1-500-000
Telp. (0711) 511430 Operator : (0711) 513311 ext : 5177 Facs : (0711) 519524 E-mail :
[email protected] • RFM REGION : PUTUT A. (0813 3984 5678)
REGION VI BALIKPAPAN
REGION III JAKARTA
REGION IV SEMARANG
Telp. (021) 31992018/ 31992009
Telp. (024) 3517081 / 3545341
Facs. (021) 3926007 E-mail :
[email protected]
• RFM REGION : NURHADIYA(081125077090)
Intern : 5050 Facs. : (024) 3564518 E-mail :
[email protected]
• BRANCH JABAR : SUSI ARYANI (0811867087)
• RFM REGION : Iin Febriyan (0811 1875 818 ) • BRANCH DIY & SURAKARTA : DODY PRASETYA (081 1852 586)
REGION VII MAKASAR
REGION VIII MALUPA
Telp. (0542) 7524313 / 4567 Facs. (0542) 731902 E-mail :
[email protected]
Telp. (0411) 830186 Facs. (0411) 835428 E-mail :
[email protected]
Telp. (0967) 544179
•RFM REGION : RAMA SUHUT (0811 431051) •BRANCH KALBARTENG : EKO HARJITO (0811 341 0333)
• RFM REGION : TATA PANDAYA (0811780093) • BRANCH SULUTENGGO : GUNAWAN W (08153124343)
• RFM REGION : ZIBALI HISBUL MASIH (0811 2279 985) • BRANCH MALUKU : TIARA THESAUFI H (08114108565)
Facs. (0967) 541768 / 423 E-mail :
[email protected]
42 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
43
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
6.4. WEBSITE DAN EMAIL No. 1.
2.
3.
4.
5.
6.
7.
44
Instansi
Instansi Alamat Website dan e-mail
Kementerian ESDM Website www.esdm.go.id e-mail
[email protected] Direktorat Jenderal Minyak dan Gas Bumi Website www.migas.esdm.go.id e-mail
[email protected] Direktorat Jenderal Ketenagalistrikan Website www.djk.esdm.go.id e-mail
[email protected] BPH Migas Website www.bphmigas.go.id e-mail
[email protected] Badan Geologi Website www.bgl.esdm.go.id dan www.magma.vsi.esdm.go.id e-mail
[email protected] PT. Pertamina (Persero) Website www.pertamina.com e-mail
[email protected] dan
[email protected] PT. PLN (Persero) Website www.pln.co.id
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
LAMPIRAN B. KESIAPAN PENYEDIAAN LPG
A. KESIAPAN PENYEDIAAN BBM
D. MITIGASI BENCANA GEOLOGI
C. KESIAPAN LISTRIK
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
45
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
A. KESIAPAN PENYEDIAAN BBM
46
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
PETA KENAIKAN KONSUMSI BBM MASA IDUL FITRI 1437 H / 2016 M
PETA KENAIKAN KONSUMSI BBM MASA IDUL FITRI 1437 H / 2016 M
52 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
47
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
KESIAPAN SPBU JALUR LINTAS SUMATERA : SUMATERA KESIAPAN SPBU JALUR LINTAS SUMATERA : SUMATERA UTARA UTARA
Terdapat 328 SPBU, termasuk 211 SPBU Pertamax di Jalur Lintas dan wisata yang akan disiagakan
RENCANA SPBU POSKO ARUS MUDIK Kab/Kota NO SPBU ALAMAT : BATAS PROVINSI : JALUR LINTAS : SPBU PERTAMAX SPBU KANTUNG : SPBU POSKO ARUS MUDIK
Kab. Karo Kodya Tebing Tinggi Kab. Batu Bara Kab. Asahan Kab. Labuhan Batu Utara Kab. Labuhan Batu Selatan
14.221.248
Jl. Raya Brastagi - Sibolangit
14.206.162
Jl. K.L. Yos Sudarso – Tebing Tinggi
14.212.216 14.212.268
Desa Petatal – Lima Puluh Desa Hessa Air Genting – Simpang Kawat
14.214.234
Jl. Raya Aek Kanopan – Labuhan Batu
14.214.287
Jl. Lintas Sumatera Kec. Kota Pinang
Total
6 SPBU 57
48
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
KESIAPAN SPBU JALUR LINTAS : SUMATERA BARATBARAT KESIAPAN SPBU JALURSUMATERA LINTAS SUMATERA : SUMATERA
Terdapat 117 SPBU, termasuk 96 SPBU Pertamax di Jalur Lintas dan wisata yang RENCANA SPBU POSKO ARUS MUDIK akan disiagakan Kab/Kota
NO SPBU 14.261.580
ALAMAT
: BATAS PROVINSI
Kab. Agam
JL.RY.BUKIT TINGGI PAYAKUMBUH KM.15
: JALUR LINTAS
Kab, Lima Puluh Koto 14.262.544
: SPBU PERTAMAX SPBU KANTUNG : SPBU POSKO ARUS MUDIK
Kab. Sawah Lunto
14.275.555
JL.LINTAS SUMATERA MUARA KELABAN
Kab. Dharmasraya
14.275.5104
JL.LINTAS SUMATERA KM.10 JORONG SIAPI-API
JL. LINTAS RIAU DS. SARI LAMAK ARAU
Total
4 SPBU 58
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
49
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
KEPADATAN LALU LINTAS –(BAKAUHENI – BDR. LAMPUNG) KEPADATAN LALU LINTAS (BAKAUHENI BDR. LAMPUNG)
Rawan Kemacetan
SPBU Jual Pertalite SPBU Jual Pertamax SPBU Jual Solar Non Subsidi SPBU Jual Subsidi AKR
50
59 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
PETA SEBARAN SPBU JALUR MUDIK & WISATA JAWA TENGAH
PETA SEBARAN SPBU JALUR MUDIK & WISATA JAWA TENGAH Jalur Mudik
Jumlah ( SPBU)
wilayah
Jalur utara
Pantura
108
Jalur tengah
banyumas-banjarnegara, semarang-blora-cepu, jogja-klaten-gunungkidul, klaten-wonogiri, surakarta-karanganyar-sragen
180
Jalur Selatan pantai selatan, gunungkidul-wonogiri-ponorogo
41
63 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
51
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
PETA RENCANA SPBU TRANSIT SEPEDA MOTOR PETA RENCANA SPBU TRANSIT SEPEDA MOTOR Wilayah INDRAMAYU 1 3445212 2 3445214 Wilayah CIREBON 3 3445141 4 3445138 5 3445103 Wilayah KARAWANG 6 3441344 7 3441304 8 3441311 9 3441305 10 3441318 11 3441329 12 3441322 13 3441326 14 3441330 15 3441334 16 3441309 17 3441307 Wilayah SUBANG 18 3441208 19 3441213 20 3441222 21 3441217 22 3441201 23 34-41203 WILAYAH BOGOR 24 3416706 25 3416713 26 3416935 27 3416901 28 3416805 29 3416802 WILAYAH BEKASI 30 3417509 31 3417506 32 3417540
52
www.esdm.go.id
JL.RY.SUKRA WETAN,IDR KANDANGHAUR, INDAMAYU DS.KASUGENGAN LOR, KEC.DEPOK, CIREBON JL. RY. DS.ASTANA MUKTI KEC.PANGENAN CRB JL.RY.DS BENDUNGAN.CRB JL.RY.KARAWANG TANJUNG PURA, KEL.PAWITAN KEC.KARANG BRT JL.RY.PANCAWATI KMP.BABAKAN MAJA,DS JOMIN JL.PURWASARI,CIKAMPEK JL.RAYA JATISARI DS PANGULAH JATISARI TALAGASARI JL.SYEHQURO PALAWAD JL. RY. CIKALONGSARI CILAMAYA JL.RY.JATISARI-SBG DS.JATISARI JL.RY PAMANUKAN JL.RY CIKAMPEK,DAWUAN Jl. Raya cibanggala patokbeusi Jl. Raya warungnangka ciasem Jl. Raya mundusari Jl.raya sukasari Jl..raya kebon danas pusaka Jl.Raya Batangsari JL. RAYA CIBOGO, PUNCAK JL.MAYJEN HE.SUKMA KMP.CIKERETEG DS.CIDERUM KEC.CARINGIN JL.RY.BOGOR KEL.CIBINONG KEC.CIBINONG JL.RY.CIBINONG KM 12 JL.RY JONGGOL,CILEUNGSI JL. RY. JONGGOL.CILEUNGSI, BOGOR JL.RY.LEMAH ABANG CIKARANG JL.RY HASANUDDIN TAMBUN JL.RENGAS BANDUNG DS.BOJONGSARI KEDUNGWARINGIN
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
65
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
RENCANA MOBIL TANGKI DAN SPBU KANTONG BBM www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
53
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
KESIAPAN MOBIL TANGKI KESIAPAN MOBIL TANGKI WILAYAH JAWA -WILAYAH MADURAJAWA - MADURA Plumpang
Tg. Gerem MERAK
SERANG
JAKARTA
TANGERANG
BEKASI
Balongan
Cikampek KARAWANG CIKAMPEK
PANIMBANG
BOGOR
KDG. HALANG
Pengapon
Tegal
DAWUAN
PURWAKARTA
CIREBON
CIAWI
BANDUNG
TEGAL
PEMALANG
BATANG
SEMARANG
TEMANGGUNG
MAGELANG
Tasikmalaya
WANGON
CILACAP
KEBUMEN
PURWEREJO
54
Terminal BBM
Jumlah (Unit)
Total Kap. (KL)
Tanjung Gerem Plumpang Cikampek Balongan Bandung Group Tasikmalaya Tegal Maos Rewulu
66 257 87 68 141 42 36 67 67
1576 6280 2024 1400 2848 728 752 1312 1536
SURABAYA
GRESIK
SALATIGA NGAWI SRAGEN
BOYOLALI
SURAKARTA
SLEMAN
KLATEN
Maos
LAMONGAN
TUBAN
Boyolali
UNGARAN
CIAMIS
Surabaya
BULU
KUDUS
KENDAL
CILEUNYI
REMBANG
DEMAK
SUKABUMI
Bandung Grp
Tuban PATI
BREBES SUMEDANG
MOJOKERTO
SIDOARJO
NGANJUK
Madiun
KERTOSONO
Camplong
GEMPOL
JOMBANG
PANARUKAN
PROBOLINGGO PASURUAN
YOGYAKARTA
Rewulu
MALANG
BANYUWANGI
Malang
Tg. Wangi
Terminal BBM
Jumlah (Unit)
Total Kap. (KL)
Pengapon Boyolali Camplong Madiun Tuban Malang Surabaya Group Tanjung Wangi
139 93 20 43 50 31 192 52
3112 2152 280 904 1144 680 5048 1312
Total
831
18456
67 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
KESIAPAN MOBIL TANGKI WILAYAH KESIAPAN MOBILSUMATERA TANGKI WILAYAH SUMATERA Terminal BBM Jumlah (Unit)
Total Kap. (KL)
Krueng Raya Lhokseumawe Meulaboh Medan Kisaran P. Siantar Sibolga Dumai Siak Teluk Kabung Batam Bintan Jambi Kertapati Pangkal Balam Lubuk Linggau Lahat Baturaja Pulau Baai Panjang
18 27 22 130 8 12 41 138 90 174 14 8 77 51 26 10 16 21 26 90
408 600 368 2472 150 216 672 2522 1526 2706 276 74 1240 1000 400 160 153 181 416 1904
Total
999
17444
68 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
55
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
KESIAPAN MOBIL TANGKI WILAYAH BALI - NTB KESIAPAN MOBIL TANGKI WILAYAH BALI - NTB
56
www.esdm.go.id
Terminal BBM
Jumlah (Unit)
Total Kap. (KL)
Manggis
56
1000
Sanggaran
24
496
Ampenan
21
392
Bima
6
110
Badas
10
153
Total
117
2151
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
69
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
PENAMBAHAN TONNAGE TANKER
PENAMBAHAN TONNAGE TANKER
Rencana Penambahan Tonnage: • Tongkang : 1 Unit • Small 2 : 1 Unit • Small 1 : 7 Unit • Tug & Barge : 1 Unit
70 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
57
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
RENCANA KIOS PERTAMAX/SERAMBI PERTAMAX SEBANYAK 30 OUTLET RENCANA KIOS PERTAMAX/SERAMBI PERTAMAX SEBANYAK 30 OUTLET (MASA 23 JUNI – 2 JULI 2017) (MASA LAYANAN TGL 23 JUNILAYANAN – 2 JULI TGL 2017) MERAK
SERANG
Fungsional Juni JAKARTA 2017 TANGERANG
Fungsional Juni 2017
Fungsional Juni 2017
BEKASI
KARAWANG CIKAMPEK
PANIMBANG
BOGOR
KDG. HALANG
PURWAKARTA
DAWUAN
CIREBON
CIAWI
BANDUNG
PATI
BREBES TEGAL
SUMEDANG
PEMALANG
BATANG
SEMARANG
DEMAK
REMBANG
BULU
KUDUS
SUKABUMI
LAMONGAN
TUBAN
KENDAL
CILEUNYI
UNGARAN
CIAMIS
TEMANGGUNG
MAGELANG WANGON
CILACAP
KEBUMEN
PURWEREJO
GRESIK SALATIGA NGAWI SRAGEN
BOYOLALI
SURAKARTA
SLEMAN
MOJOKERTO NGANJUK KERTOSONO
JOMBANG
SURABAYA SIDOARJO GEMPOL PROBOLINGGO
KLATEN
PANARUKAN
PASURUAN
YOGYAKARTA MALANG
BANYUWANGI
• Jalur Pantura & Toll Jakarta – Cirebon (Jawa Barat) 11 Outlet • Jalur Pantura & Toll Cirebon – Semarang & Jalur Selatan Jateng 18 Outlet • Jalur Area Tol Sidomulyo - Kotabaru Bandarlampung 1 Outlet
58
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
71 @kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
DETAIL 30 KIOS PERTAMAX - PERTAMINA LIST DETAIL 30 KIOSLIST PERTAMAX - PERTAMINA •
Jalur Pantura & Toll Jakarta – Cirebon (Jawa Barat) 11 Outlet
No 1 2 3 4 5 6 7 8 9 10 11
Lokasi Kios Pertamax Gudang Beras Jl Cibitung Simpang Jomin Kantor Desa Cikalong, Cilamaya Dawuan Cirebon Pantura Cijinjing RM Sari Rasa Limbangan Toll Cipali KM 86 Toll Cipali KM 130 Tol Cipali KM 228
•
Jalur Sumatera Tol Sidomulyo – Kotabaru 1 Outlet No 1
Lokasi Kios Pertamax Area Tol Sidomulyo - Kotabaru
Kab / Kota Bekasi Karawang Karawang Karawang Cirebon Cilacap Tasikmalaya Garut Subang Subang Cirebon
Kab/Kota Bandar Lampung
•
Jalur Pantura & Toll Cirebon – Semarang & Jalur Selatan Jateng 18 Outlet
No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Lokasi Kios Pertamax Rest Area Km 252 (Tol Pejagan Pemalang) Rest Area Temporary Km 303 (Tol Pejagan Pemalang) Rest Area Temporary Km 311 (Tol Pejagan Pemalang) Exit Toll Km327 - Pemalang (Tol Pejagan Pemalang) Rest Area Temporary Km 345 - Pekalongan (Tol Pemalang - Batang) Rest Area Temporary Km 367 - Batang (Tol Pemalang - Batang) Rest Area Temporary Km 402 - Batang (Toll Batang - Weleri) Rest Area Temporary Km 438 - Kaliwungu (Toll Batang - Weleri) Check Point Polda - Rest Area / Resto Pring Jajar - Pemalang Check Point Polda - Rest Area Pekalongan Simpang Wangon - Banyumas Jln Daendels I - Kebumen Jln Daendels II ( Kondisional ) - Kebumen Jln Daendels III ( Purworejo ) SPBU Rest Area KM 22 Tol Bawen Rest Area Temporary Km49 - Salatiga (Tol Bawen - Salatiga) Area Pintu Tol Klodran Colomadu (Tol Solo - Sragen) Area Exit Tol taraman Sragen (Tol Solo - Sragen)
Kab / Kota TOL - ( Pejagan Pemalang ) TOL - ( Pejagan Pemalang ) TOL - ( Pejagan Pemalang ) TOL - ( Pejagan Pemalang ) Kab. Pekalongan TOL - ( Pemalang - Batang ) TOL - ( Batang - Weleri ) TOL - ( Batang - Weleri ) Reguler PANTURA Non Toll Pekalongan Reguler Selatan Non Toll Jalur Selatan - Kebumen Non Toll Jalur Selatan - Kebumen Non Toll Jalur Selatan - Purworejo TOL - ( Semarang - Bawen ) TOL - ( Bawen - Salatiga ) TOL - ( Solo Sragen ) TOL - ( Solo Sragen )
72 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
59
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
KIOSK PERTAMAX
60
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
MT FLOWMETER
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
61
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
RENCANA KANTONG BBM SUMATERA UTARA RENCANA KANTONG BBM SUMATERA UTARA
Kab/Kota
62
NO SPBU
ALAMAT
Kab. Langkat
14.208.167
Jl. Lintas Aceh Kec. Tanjung Pura
Kodya Tebing Tinggi
14.2061124
MEDAN-P.SIANTAR, DS. MORULAK, RAMBU
Kab. Tapanuli Selata
14.227312
KM.9 JL.RAYA P. SIDEMPUAN PENYABUNG
Kab. Labuhan Batu Selatan
14.214215
Jl. Lintas Sumatera DesaCikampak
Kab. Karo
14.221286
JL. RAYA BERASTAGI - KABAN JAHE
Total
www.esdm.go.id
@KementerianESDM
5 SPBU
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
75
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
RENCANA KANTONG BBM SUMATERA BARAT RENCANA KANTONG BBM SUMATERA BARAT
Kab/Kota
NO SPBU
Kab. Pariaman ,Kab. Agam Kab. Agam Kodya Bukit Tinggi Kota Payakumbuh Kab. Pes-Sel
14.255.577 14.264.566 14.261.580 14.261.537 14.262.543 14.256.561
ALAMAT Kayu Tanam, Pariaman Jl Padang-Bukittinggi, Ds Ladang Jl Raya Bukittinggi – Payakumbuh, Baso Jl Raya Jenderal Sudirman Jln Raya Payakumbuh Salido – Painan
Total
www.esdm.go.id
@KementerianESDM
6 SPBU
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
76 63
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
RENCANA KANTONG BBM SUMBAGSEL RENCANA KANTONG BBM SUMBAGSEL Penyempitan dan kerusakan jalan di Pangkalan Balai Penyempitan dan kerusakan Jalan di Perbatasan Kota Palembang dan Banyuasin
8 Jalur Lintas :
Lintas Timur Lintas Tengah Lintas Barat Lintas Pantai Timur Lintas Sumatera
Pelebaran Jalan Indralaya s.d KM 32
4 Provinsi
64
Jlh SPBU
Pertamax
Dex Bulk
Pertalite
Lampung
142
116
33
119
Sumsel
135
112
33
65
SPBU Kantong: No.
No. SPBU
3 Kabupaten
1
21.101.02
Lampung Selatan
2
24.341.12
Lampung Tengah
Bengkulu
38
32
12
21
Jambi
70
54
21
33
Babel
58
39
15
28
3
24.345.82
Lampung Utara
TOTAL
443
353
112
266
4
24.345.72
Tulang Bawang
Pasar Tumpah Indralaya Tanjung Raja
2
Antrian Keluar Pelabuhan Bakauheni
1
1
77 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
RENCANA KANTONG RENCANA KANTONG BBM JAWA BARATBBM JAWA BARAT
78 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
65
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
RENCANA KANTONG BBM JAWA TENGAH RENCANA KANTONG BBM JAWA TENGAH
79
66
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
RENCANA KANTONG BBM JAWA TIMUR RENCANA KANTONG BBM JAWA TIMUR
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
80
67
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
B. KESIAPAN PENYEDIAAN LPG
68
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
KESIAPAN PASOKAN LPG
Pertamina menyiapkan Kantong SPPBE dan menambah ketersediaan LPG di SPBU untuk mengamankan pasokan selama Lebaran
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
69
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
POLA DISTRIBUSI LPG
POLA DISTRIBUSI LPG
Refrigerated RETESTER
DEPOT TG. UBAN
IMPOR Refrigerated/P ressurized
Kapal Pressurized
Pemeliharaan Tabung
Cargo Balance
Kapal Pressurized
Refrigerated FLOATING STORAGE
KKKS Refrigerated/ Pressurized
DEPOT/ TERMINAL
-Skidtank -Pipa
SP(P)BE/ SPPEK PSO/NPSO
AGEN
Kapal Pressurized Pipa
REFINERY
INDUSTRI
Kapal Pressurized Pipa Skidtank
Kilang PERTAMINA/ Swasta LPG Pressurized Musicool
112
70
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
Sebaran Jaringan Suplai & Distribusi LPG
Sebaran Jaringan Suplai & Distribusi LPG
LPG Distribution Facilities
Pkl. Susu
Region I Sumatera Bag. Utara Depot LPG : 4 Jumlah Skidtank = 200 unit; cap 2912 MT AGEN PSO / NPSO : 441/ 145 SP(P)BE PSO / NPSO : 49 / 15 Pangkalan 3 kg: 15.283
Medan
MEULABOH
LPG Depo milik & Swasta SPPBE/SPBE 3 kg SPPBE/SPBE/SPPEK 12&50 kg LPG 3 kg agents LPG Non PSO agents Pangkalan Skidtank Total cap Floating storage
Region VI Kalimantan Depot LPG : 3 Skidtank : 61 unit ; cap 712 MT AGEN PSO / NPSO : 195 / 54 SP(P)BE PSO / NPSO : 19 / 4 Pangkalan 3 kg: 5.323
P. NATUNA
Natuna
TARAKAN
SIBOLGA G. SITOLI
P. BATAM
Dumai
Tj. Santan
Tj.P. SAMBU Uban
BONTANG
SINTANG
JAMBI
BALIKPAPAN
SAMPIT
BENGKULU
Region II Palembang Sumatera Bag. Selatan Plaju PANJANG Depot LPG : 2 Skidtank = 118unit; cap 1671 MT AGEN PSO / NPSO : 284/ 56 SP(P)BE PSO / NPSO : 32 / 9 Pangkalan 3 kg: 8.870
DONGGALA
Balikpapan
POSO
P. PISANG
PARE - PARE
KOTA BARU UJ. PANDANG
Makasar PLUMPANG
FAK - FAK
MERAUKE
CAMPLONG
SEMARANG
6 10 16
MANOKWARI
LUWUK
Region VII BULA BANGGAI KENDARI Sulawesi NAMLEA MASOHI Depot LPG : 2 KOLEKA RAHA Skidtank =122 unit; cap 1559 MT -BAU AGENBAU PSO / NPSO : 229 / 57 SP(P)BE PSO / NPSO : 24 / 11 TUAL Pangkalan 3 kg: 16.338
KOLONDALE PALOPO
BANJARMASIN
SURABAYA
Surabaya
MENENG
MAUMERE
BADUNG AMPENAN
Region III Jawa Bagian Barat Depot LPG : 4 Skidtank = 374 unit ; cap 5457 MT AGEN PSO / NPSO : 1107/ 147 SP(P)BE PSO / NPSO : 168 / 31 Pangkalan 3 kg: 20.233
SUBUNG
PARIGI
CILIK RIWUT
PKL.BUN
GORONTALO
MOUTONG
SAMARINDA
PONTIANAK
Jabung
Jumlah Kapal/Tanker LPG Tanker VLGC (@44,000 MT) : Tanker semi-ref. (@10,000 MT) : Tanker pressurized (@1,700 MT ) :
TOLI - TOLI
Bontang
SIAK
: 20 : 497 : 101 : 3333 : 677 : 127.397 : 1328 unit : 19.321 MT :6 unit total cap 264.000 MT
TT. Manggis
KALABAHI
REO BIMA
ENDE WAINGAPU
Region IV Jawa Tengah dan DIY Depot LPG : 2 Skidtank : 182 unit; cap 2883 MT AGEN PSO / NPSO : 405/ 84 SP(P)BE PSO / NPSO : 90 / 12 Pangkalan 3 kg: 35.343
Depot Mini masih dalam proses tender : Depot Mini Sulteng, Sultra dan Lombok
L. TUKA
DILI
Region VIII Maluku Papua SAUMLAKI AGEN NPSO : 14
ATAPUPU
KUPANG
Region V Jawa Timur, Bali dan Nusa Tenggara Depot LPG : 3 Skidtank = 271 unit; cap 4127 MT AGEN PSO / NPSO : 672 / 110 SP(P)BE PSO / NPSO : 115 / 19 Pangkalan 3 kg: 26.007
113 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
71
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
POLA SUPLAI NASIONAL POLA SUPLAI LPGLPGNASIONAL Floating Storage Pangkalan Susu
SPPEK
Pkl. Susu Tandem
MEULABOH
Depot
Kilang
Natuna P. NATUNA TARAKAN
SIBOLGA G. SITOLI
P. BATAM
Dumai
Tj.P. SAMBU Uban
SAMARINDA
JAMBI
BALIKPAPAN
Palembang Jabung Plaju
BENGKULU
TOLI - TOLI
BONTANG
SINTANG PONTIANAK
SAMPIT
Pertasamtan
Pulau Layang
Tj. Santan
Bontang
SIAK
PKL.BUN
DONGGALA
Balikpapan
SUBUNG POSO
PARIGI
CILIK RIWUT
P. PISANG
PARE - PARE
MANOKWARI
LUWUK
KOLONDALE PALOPO
BANJARMASIN
STS Gorontalo/ Bitung
GORONTALO
MOUTONG
BULA
BANGGAI
NAMLEA
KENDARI
MASOHI
FAK - FAK
KOLEKA PANJANG
Floating Storage Teluk Semangka
RAHA
KOTA BARU
Panjang
BAU -BAU
Floating Storage Bosowa Tg. Priok Makassar Kalbut - Situbondo Tg.PLUMPANG Sekong Eretan Balongan CAMPLONG SEMARANG SURABAYA Maspion CPO MAUMERE BADUNG Surabaya MENENG REO UJ. PANDANG
Cilacap
AMPENAN
TT. Manggis
BIMA
ENDE WAINGAPU
TUAL
MERAUKE
KALABAHI SAUMLAKI
L. TUKA
DILI ATAPUPU
KUPANG
Keterangan : • Suplai Depot/Terminal LPG berasal dari Depot LPG Tg. Uban/ Refinery Unit/ Floating Storage yang diangkut menggunakan kapal pressurized/ refrigerated. • Untuk remote area, suplai LPG menggunakan kapal dengan kapasitas sekitar 300 – 1000 MT sehingga dapat melalui laut/sungai draft dangkal • Untuk Refinery Unit/Kilang Swasta mensuplai SP(P)BE dengan moda transportasi darat, yaitu mobil tangki LPG. 114
72
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
REGION III – SPPBE Kantong Supply LPG
REGION III – SPPBE Kantong Supply LPG
115 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
73
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
SUPPLY LPG REGULER DAN EMERGENCY DI REGION III
SUPPLY LPG REGULER DAN EMERGENCY DI REGION III Reguler Alternatif
Depot Sekong Kap : 10.000 MT DOT: 1500 MT/day Depot Tg.Priok Kap : 16.0000 MT DOT: 2700 MT/day STS Tlk. Semangka Kap : 180.000 MT DOT: 8.000 MT/day
Kilang Pondok Tengah Kap : 1000MT DOT: 95MT/day Kilang Cilamaya Kap : 1000MT DOT: 40MT/day Terminal Eretan Kap : 10.000MT DOT: 1300MT/day
Depot Balongan Kap : 3000 MT DOT: 700 MT/day RU VI Balongan Kap : 5.500 MT DOT: 650MT/day
RAE • Supply Reguler - Wilayah Jabodetabek di Suplai dari Depot Priok,Sekong - Wilayah Bandung di Supply dari Terminal Eretan dan RU VI Balongan - Wilayah Tasikmalaya di Supply dari Terminal Eretan dan Depot Cilacap • Supply Alternatif pada saat Arus Mudik dan Balik - Wilayah Jabodetabek maksimalkan pengambilan dari Depot Sekong via jalur alternatif Bojanegara - Wilayah Bandung penambahan jalur suplai dari Depot Tg. Priok - Wilayah Tasikmalaya jalur suplai dialihkan ke Depot Cilacap
116
74
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
REGION IV - SPPBE Kantong Supply LPG PSO PT. Rejeki Berkah Empat Putra RU VI Balongan
PT. Mitha Jaya Kusuma
PT. Amanah Data Reka
MEM Gresik
PT. Puri Sakti Energi Perkasa
Opsico
PT. Tunas Sejati
PT. Sarigas Prima Abadi PT. Nisiha Biru Abadi
PT. Jatirata Mitra Mulya
Depot LPG Cilacap
117
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
75
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
SUPPLY LPG REGULER DAN EMERGENCY DI REGION IV MEM Gresik
ZONA 2
RU VI Balongan
ZONA 1 Kabupaten Batang, Pekalongan , Pemalang dan Tegal Disupply dari Balongan Opsico
Daerah Demak, Jepara , Kudus, Pati, Rembang, Blora dan Purwodadi Disupply dari Tj Mas
Daerah Brebes Disupply Dari Balongan Daerah Temanggung Disupply Dari Tj Mas
Banyumas Dan Sekitarnya sampai tegal Disupply Dari Cilacap
ZONABanjar 4 negara, Wonosobo
ZONA 3
Disupply Dari Cilacap
Depot LPG Cilacap
Jogjakarta Disupply Dari Cilacap
Zona
Reguler
RAE
Zona 1
Depot & RU VI Balongan
T.Eretan & T Tj Mas
Zona 2
T. Tanjung Mas
MEM Gresik
Zona 3
Depot Cilacap
T. Tanjung Mas
Zona 4
Depot LPG Cilacap
Balongan dan T. Tj Mas
Solo ,sragen , wonogiri Surakarta Disupply dari Cilacap
118
76
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
REGION IV - SPPBE Kantong Supply LPG Non PSO PT. Nusa Pradipta Sentosa
PT. Dirgantara Bakti Sentausa
RU VI Balongan
MEM Gresik
PT. Manggala Puri Sakti
Opsico
PT. Cental Gasindo Mulia
PT. Indah Sri Rejeki PT. Patra Trading Cilacap PT. Bakti Bunga Ananda
Depot LPG Cilacap
119
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
77
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
REGION V Kantong – SPPBE Kantong Supply JawaTimur Timur REGION V – SPPBE Supply LPGLPG Jawa SPPBE Sumber Bina U.M Kap : 100 MT S/T : 50 MT
MKS Kap : 3.000 MT P.Bawean DOT : 360 MT/day COD: *7 days
SPPBE Profil Sukses Ab. Kap : 50 MT S/T : 21 MT
SPPBE Gas Bumi N.J Kap : 100 MT S/T : 45 MT
SPPBE Cahaya Negeri Kap : 50 MT S/T : 20 MT
Tuban
Bangkalan
Depot Tj. Perak Kap : 8.000 MT DOT :1600 MT/day COD : 5 days
SPPBE Gas Madura P. Kap : 50 MT S/T : 45 MT
Sumenep Sampang
Pamekasan
P.Sapudadi
Lamongan
SPPBE Madiuni Elpiji Kap : 100 MT S/T : 35 MT
Bojonegoro
Madiun
Jombang
Nganjuk
SPPBE Mahkota Migas Kap : 100 MT S/T : 25 MT
SPPBE Anugerah S.B. Kap : 100 MT S/T : 30 MT
Sidoarjo
Magetan SPPBE Gas Alam Bumi R. Kap : 100 MT S/T : 25 MT
Surabaya
Gresik
Ngawi Mojokerto
SPPBE Hakamindo Kap : 90 MT S/T : 45 MT
Pasuruan
Kediri Ponorogo
Situbondo
Probolinggo Tulungagung
SPPBE Argopuro M.S Kap : 100 MT S/T : 85 MT
Bondowoso
Blitar
Pacitan
Lumajang Trenggalek SPPBE Sinar Wahana Kap : 100 MT S/T : 50 MT
Note:
Terminal MEM Kap : 10.000 MT DOT:1550 MT/day COD: 6.5 days
Depot/Terminal SPPBE PSO Operasi SPPBE NPSO Operasi & Pemisahan
Malang
Jember Banyuwangi
SPPBE Sinar Hasil B. Kap : 130 MT S/T : 107 MT SPPBE Agam Seulawah Kap : 100 MT S/T : 30 MT
SPPBE Trien Gasmiku Kap : 50 MT S/T : 45 MT
SPPBE Permata E.B.I Kap : 100 MT S/T : 50 MT SPPBE Tri Tunggal A.M Kap : 100 MT S/T : 65 MT
120
78
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
REGION VI Kantong – SPPBE Kantong SupplyLPG LPG Bali REGION V – SPPBE Supply Bali
Bangli
Buleleng Jembrana
Gianyar
Tabanan
Terminal LPG Manggis Kap : 3.000 MT DOT : 750 MT/day Karang Asem COD: 4 days
Klungkung Bandung
Pel. Padang Bay
Denpasar
Note:
Klungkung
Depot/Terminal LPG SP(P)BE Belum Pemisahan SP(P)BE PSO Operasi SP(P)BE PSO Belum Operasi SP(P)BE NPSO Operasi
121 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
79
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
REGION VII – SPPBE Kantong Supply REGION VII – SPPBE Kantong Supply 1.
Lokasi Potensi Stock Kritis pada H-10 & H+10 yaitu sebagai berikut : SPPBE – SPPBE wilayah pelayanan SPPEK Bitung dan atau SPPEK Gorontalo
2.
PETA KANTONG LOKASI SP(P)BE STOCK BUFFER UNTUK SUPLAI KE SP(P)BE STOCK KRITIS PADA SAAT SPPEK Bitung (H-10 DAN H+10) Kap : 600 MT DOT : 105,67 MT/day
SPPEK Gorontalo Kap : 500 MT DOT : 40 MT/day
Kantong Suplai Skid Tank LPG
3.
Reguler Alternative
Skid tank stand by sebanyak 10 unit @ 13 MT (include Skid Tank Transportir)
122
80
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
81
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
C. KESIAPAN LISTRIK
82
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
PROYEKSI KONDISI TENAGA PROYEKSI KONDISIPENYEDIAAN PENYEDIAAN TENAGA LISTRIKLISTRIK IDUL FITRI IDUL 1438 HFITRI 1438 H H+15 //2222 JuniJuni 20172017 s.d 24 Juni (H-15(H-15 s.ds.dH+15 s.d2017) 24 Juni 2017) No.
Wilayah
1
P3BS
Sistem SBU Sumut Aceh SBST SBS S2B Lampung SBT
2 3 4 5 6 7 8 9 10 11 12 13 14
Sumbar Riau Jambi KEPRI Tanjung Pinang BATAM Batam Bangka BABEL Belitung KALBAR Kalbar KALTIM Kaltim KSKT Kalselteng SULUTTENGGO SulutGo Sulawesi Selatan SULSELRABAR Kendari Ambon M2U Ternate + Maluku Isolated Jayapura PAPUA Sorong + Papua Isolated Lombok NTB Bima dan Sumbawa Kupang NTT NTT Isolated Jawa Bali Jawa & Bali
DM (MW) 1979,74 1711,31 268,44 3759,69 2266,99 1579,57 687,42 1492,69 520,06 603,13 369,50 84,00 477,00 168,40 65,35 677,63 809,78 670,01 458,80
1237,30 83,10 109,73 118,85 90,00 187,75 278,30 112,80
126,90 99,90 28589,25
22 Juni 2017 23 Juni 2017 24 Juni 2017 BP (MW) Cad. (MW) DM (MW) BP (MW) Cad. (MW) DM (MW) BP (MW) Cad. (MW) 1827,15 407,59 1989,10 1809,01 435,09 1989,10 1620,41 623,69 1479,99 366,31 1711,31 1465,30 381,01 1711,31 1312,53 533,78 347,16 41,28 277,79 343,71 54,08 277,79 307,88 89,91 3188,62 316,06 3759,69 3192,10 312,59 3669,69 2726,05 688,63 1753,74 263,25 2266,99 1755,66 261,34 2266,99 1499,33 517,66 860,93 148,64 1579,57 861,87 147,71 1579,57 736,03 273,54 892,81 114,61 687,42 893,79 113,63 687,42 763,30 244,13 1434,88 222,81 1492,69 1436,45 221,25 1402,69 1226,72 340,97 551,55 118,51 520,06 552,16 117,91 430,06 471,54 108,52 568,25 79,88 603,13 568,87 79,26 603,13 485,81 162,32 315,08 24,42 369,50 315,42 24,08 369,50 269,37 70,13 67,00 17,00 84,00 66,00 18,00 84,00 60,00 24,00 325,62 116,38 477,00 313,85 128,15 490,00 303,30 151,70 127,63 40,77 168,40 116,50 51,91 168,40 115,85 52,55 36,90 28,45 65,35 37,10 28,25 65,35 36,00 29,35 401,83 275,79 653,03 402,48 250,55 653,03 402,48 250,55 569,63 240,15 808,18 567,53 240,65 815,08 570,03 245,05 573,81 96,21 670,01 577,29 92,73 670,01 579,86 90,16 351,52 107,28 458,80 352,41 106,39 458,80 320,48 138,32 1013,00 1237,30 998,00 955,00 224,30 239,30 1237,30 282,30 78,90 4,20 84,90 80,40 4,50 81,70 78,70 3,00 56,85 52,88 109,73 56,85 52,88 109,73 56,85 52,88 99,66 19,19 118,85 99,66 19,19 118,85 99,66 19,19 68,03 21,97 90,00 68,03 21,97 90,00 68,03 21,97 166,27 21,48 187,75 166,27 21,48 187,75 166,27 21,48 219,00 59,30 283,30 219,00 64,30 283,30 216,00 67,30 82,49 30,31 112,80 81,38 31,42 112,80 80,73 32,07 41,88 40,55 46,14 85,02 126,90 86,35 126,90 80,76 32,10 31,96 32,40 67,80 99,90 67,94 99,90 67,50 19010,90 9578,36 28589,25 17304,79 11284,46 28884,45 17304,79 11579,66
131 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
83
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
PROYEKSI KONDISI PENYEDIAAN TENAGA LISTRIK IDUL FITRI 1438 H PROYEKSI KONDISI PENYEDIAAN TENAGA LISTRIK IDUL FITRI 1438 H (H-15 H+15 25 2017 Junis.d2017 27 Juni 2017) (H-15s.d s.d H+15 / 25/Juni 27 Junis.d 2017) No. 1
2 3 4 5 6 7 8 9 10 11 12 13 14
84
25 Juni 2017 26 Juni 2017 27 Juni 2017 DM (MW) BP (MW) Cad. (MW) DM (MW) BP (MW) Cad. (MW) DM (MW) BP (MW) Cad. (MW) P3BS SBU 1989,10 1502,52 741,58 1979,77 1430,88 803,90 1979,77 1931,75 303,03 Sumut 1711,31 1217,04 659,26 1711,31 1159,01 717,30 1711,31 1564,71 281,59 Aceh 277,79 285,48 82,31 268,46 271,87 86,60 268,46 367,03 21,43 SBST 3669,69 2628,08 786,61 3669,69 2761,37 653,32 3669,69 2835,00 579,69 SBS 2266,99 1445,44 571,55 2266,99 1518,75 498,24 2266,99 1559,25 457,74 S2B 1579,57 709,58 299,99 1579,57 745,57 264,00 1579,57 765,45 244,12 Lampung 687,42 735,86 271,56 687,42 773,18 234,24 687,42 793,80 213,62 SBT 1402,69 1182,64 385,06 1402,69 1242,61 325,08 1402,69 1275,75 291,94 Sumbar 430,06 454,59 125,47 430,06 477,65 102,41 430,06 490,39 89,68 Riau 603,13 468,35 179,78 603,13 492,10 156,03 603,13 505,23 142,90 Jambi 369,50 259,69 79,81 369,50 272,86 66,64 369,50 280,14 59,36 KEPRI Tanjung Pinang 84,00 50,00 34,00 84,00 55,00 29,00 84,00 58,00 26,00 BATAM Batam 477,00 283,29 158,71 477,00 284,47 157,53 477,00 312,12 129,88 Bangka 168,40 122,30 46,10 168,40 121,93 46,47 168,40 120,56 47,84 BABEL Belitung 65,35 33,80 31,55 65,35 35,23 30,12 65,35 36,40 28,95 KALBAR Kalbar 684,28 404,03 280,24 684,28 403,59 280,68 654,31 402,48 251,83 KALTIM Kaltim 814,88 570,63 244,25 815,68 569,63 246,05 797,24 566,63 230,61 KSKT Kalselteng 670,01 577,74 92,27 670,01 580,91 89,10 670,01 578,44 91,57 SULUTTENGGO SulutGo 458,80 302,27 156,53 458,80 304,09 154,71 458,80 320,48 138,32 Sulawesi Selatan 1237,30 924,00 1237,30 1009,00 313,30 228,30 1237,30 1016,00 221,30 SULSELRABAR Kendari 83,50 78,00 5,50 83,70 79,10 4,60 83,90 80,30 3,60 Ambon 109,73 56,85 52,88 109,73 56,85 52,88 109,73 56,85 52,88 M2U Ternate + Maluku Isolated 118,85 99,66 19,19 118,85 99,66 19,19 118,85 99,66 19,19 Jayapura 90,00 68,03 21,97 90,00 68,03 21,97 90,00 68,03 21,97 PAPUA Sorong + Papua Isolated 187,75 166,27 21,48 187,75 166,27 21,48 187,75 166,27 21,48 283,30 199,70 83,60 283,30 199,70 83,60 283,30 208,00 75,30 Lombok NTB 26,02 33,42 112,80 80,45 32,35 Bima dan Sumbawa 112,80 86,78 112,80 79,38 37,33 47,58 126,90 47,81 Kupang 126,90 89,57 126,90 79,32 79,09 NTT NTT Isolated 31,65 34,42 29,75 99,90 68,25 99,90 65,48 99,90 70,15 Jawa Bali Jawa & Bali 28884,45 16462,38 12422,07 28990,25 16785,18 12205,07 28990,25 17215,56 11774,68 Wilayah
Sistem
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
132
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
PROYEKSI KONDISI TENAGA IDULH FITRI 1438 H PROYEKSI KONDISIPENYEDIAAN PENYEDIAAN TENAGA LISTRIK LISTRIK IDUL FITRI 1438 (H-15(H-15 s.ds.dH+15 2017 11 Juli 2017) H+15 //1010 JuliJuli 2017 s.d 11 Julis.d 2017) No.
Wilayah
1
P3BS
Sistem SBU Sumut Aceh SBST SBS S2B Lampung SBT
10 Juli 2017 DM BP (MW) (MW) 1963,09 1654,50 1726,21 1340,14 236,88 314,35 3644,81 3189,41 2072,39 1754,18 1412,19 861,14 660,20 893,04 1572,42 1435,24 512,84 551,69 547,30 568,39 512,28 315,16 84,00 72,00 477,00 355,66 168,40 121,38 64,35 36,20 653,92 406,09 771,41 568,39 670,01 610,47 458,80 353,73 1245,10 1009,00 83,70 79,10 109,73 56,85
Cad. (MW) 563,60 521,07 42,53 130,40 68,21 21,05 47,16 232,18 111,15 23,91 97,12 12,00 86,34 47,02 28,15 247,83 203,03 59,54 105,07
11 Juli 2017 DM BP Cad. (MW) (MW) (MW) 1963,09 1687,58 530,51 1726,21 1366,94 494,27 236,88 320,64 36,24 3644,81 3188,69 131,12 2090,89 1753,78 87,11 1438,09 860,95 47,14 652,80 892,83 39,97 1553,92 1434,91 214,01 505,44 551,57 103,87 543,60 568,26 20,34 504,88 315,09 89,79 84,00 72,00 12,00 477,00 360,00 82,00 168,40 125,02 43,38 64,35 35,10 29,25 653,92 406,09 247,83 771,41 567,69 203,73 670,01 606,57 63,44 458,80 347,60 111,20 1246,10 1010,00 236,10 83,90 80,30 3,60 109,73 56,85 52,88
Sumbar Riau Jambi 2 KEPRI Tanjung Pinang 3 BATAM Batam Bangka 4 BABEL Belitung 5 KALBAR Kalbar 6 KALTIM Kaltim 7 KSKT Kalselteng 8 SULUTTENGGO SulutGo Sulawesi Selatan 236,10 9 SULSELRABAR 4,60 Kendari Ambon 52,88 10 M2U Ternate + Maluku 118,85 99,66 19,19 118,85 99,66 19,19 Isolated Jayapura 90,00 68,03 21,97 90,00 68,03 21,97 11 PAPUA Sorong + Papua Isolated 187,75 166,27 21,48 187,75 166,27 21,48 283,30 225,00 58,30 283,30 225,00 58,30 Lombok 12 NTB 112,80 80,74 32,06 112,80 80,67 32,13 Bima dan Sumbawa 33,22 Kupang 126,90 80,65 46,25 126,90 93,68 13 NTT NTT Isolated 26,56 99,90 71,25 28,65 99,90 73,34 14 Jawa Bali Jawa & Bali 27318,15 24619,08 2699,07 27523,15 24738,52 2784,63
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
137
85
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
D. MITIGASI BENCANA GEOLOGI
86
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
DAFTAR GUNUNG API YANG PERLU DAFTAR GUNUNG APIDIWASPADAI YANG PERLU DIWASPADAI Provinsi Sumatera Utara NAMA GUNUNGAPI
SINABUNG (2460 m)
POSISI GEOGRAFIS dan ADMINISTRATIF
03° 10’ LU 98° 23,5’ BT Desa Surbakti Kecamatan Simpang Empat Kabupaten Karo Provinsi Sumatera Utara
NO. TELP. POS PGA/PENGAMAT
087891423084 (Armen Putra) 082242006670 (Deri Alhidayat) 085643599934 (Arif Cahyo Purnomo) 081947395394 (M. Asrori)* 081334140654 (Rudra Wibowo)* 087838580456 (Budi Marwanto)*
STATUS KEGIATAN
Level IV (Awas)
* = Pengamat dari Gunung Burni Telong, Kerinci, dan Gede
REKOMENDASI
KETERANGAN
• Masyarakat dan pengunjung atau wisatawan untuk tidak mendaki dan melakukan aktifitas pada radius 3 km dari puncak. • Masyarakat dalam jarak 7 km untuk sektor Selatan-Tenggara G. Sinabung, yang berada di bukaan lembah yang berpotensi terlanda agar dievakuasi ke lokasi yang aman dan tidak melakukan aktivitas di sektor tersebut. • Masyarakat di dalam jarak 6 km untuk sektor Tenggara-Timur G. Sinabung yang berada di bukaan lembah yang berpotensi terlanda aliran awan panas agar dievakuasi ke lokasi yang aman. • Masyarakat di dalam jarak 4 km yaitu sektor Utara – Timurlaut di dalam KRB III berpotensi terkena hujan abu lebat, yaitu desa Kutarayat dan Kutagugung agar dievakuasi ke lokasi yang aman.
•Tidak terdeteksi gasgas yang berbahaya bagi kehidupan pada jarak sekitar 2 km dari puncak G. Sinabung. •Ancaman bahaya erupsi G. Sinabung berupa abu vulkanik yang menyebar bergantung arah dan kecepatan angin, lontaran lava pijar dalam radius kurang dari 3 Km dari titik erupsi. •Penumpukan material hasil erupsi di lereng dan di lembah sungai yang berhulu di puncak berpotensi terjadinya lahar.
140
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
87
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
PETA RAWAN GEMPA BUMI
PETA RAWAN GEMPA BUMI PADA WILAYAH INDONESIA
88
201 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
TABEL KAWASAN RAWAN GEMPABUMI INDONESIA
TABEL KAWASAN RAWAN GEMPABUMI INDONESIA WILAYAH
SEJARAH GEMPABUMI MERUSAK
ACEH
1983, 1990, 2003, 2004, 2013, 2016
SUMATERA UTARA SIMEULUE
1941, 1965, 1984, 1987, 2003, 2005, 2017
SUMATERA BARAT - JAMBI
1904, 1926, 1943, 1977, 1995, 2004, 2007, 2009
SUMBER GEMPABUMI Subduksi (Sebelah Barat), Sesar Besar Sumatera (Segmen Aceh, Seulimeum dan Tripa), Sesar Lhokseumawe, Segmen Gempang-Takengon, Segmen Pidie Jaya Subduksi (Sebelah Barat), Sesar Besar Sumatera (Segmen Renun, Toru, Angkola, Barumun dan Sumpur), dan Sesar Lokal Berastagi Subduksi (Sebelah Barat)Sesar Besar Sumatera (Segmen Sianuk, Sumani, Suliti, Siulak dan Dikit) Subduksi (Sebelah Barat),Sesar Besar Sumatera (Segmen Dikit, Ketaun, Musi, Manna, dan Kumering)
BENGKULU
1833, 1914, 1952, 1979, 1991, 1997, 2000, 2007
LAMPUNG
1780, 1933, 1994
Subduksi (Sebelah Barat), Sesar Besar Sumatera (Segmen Kumering dan Semangko)
BANTEN - PANDEGLANG
1974, 1999
Subduksi (Sebelah Barat - Barat Daya), Sesar Sunda (Selat Sunda)
JAWA BARAT - BANTAR KAWUNG YOGYAKARTA LASEM JAWA TIMUR BALI
1974, 1979, 1982, 1990, 1992, 2000, 2001, 2006, 2009, 2012 1867, 1943, 1976, 2006,2014 1939 1958, 1967, 1972, 1976, 1994, 2013 1976, 1979, 2004, 2011
Subduksi (Sebelah Selatan), Sesar Opak Sesar Pati dan Sesar Lasem Subduksi (Sebelah Selatan) Subduksi (Sebelah Selatan), Flores Back-arc
Subduksi (Sebelah Selatan), Sesar Cimandiri dan Sesar Lembang
NUSA TENGGARA BARAT
1954, 1977, 1979, 2004, 2016
Subduksi (Sebelah Selatan), Sesar Normal Sumba dan Flores Back-arc
NUSA TENGGARA TIMUR
1896, 1975, 1982, 1987, 1991, 1992, 2004, 2012
Subduksi (Sebelah Selatan), Flores Back Arc,Timor Back-arc dan Wetar Back-arc
KALIMANTAN TIMUR
1921, 1923, 1926, 1975
Subduksi (Sebelah Timur / Utara Sulawesi)
SANGIHE TALAUD
1936, 1974, 1983
Sulu Thrust, Sesar Laut Maluku Barat dan Sesar Laut Maluku Timur
SULAWESI UTARA
1845, 1932, 1980, 1990
Subduksi (Utara Sulawesi), Sesar Gorontalo dan Sesar Laut Maluku Barat
GORONTALO
1941, 1990, 1991
Subduksi (Utara Sulawesi), Sesar Gorontalo
SULAWESI TENGAH
1927, 1938, 1983, 2000, 2005
Subduksi (Utara Sulawesi), Batui thrust, Sesar Palu-Koro, Poso, Matano dan Lawanopo
SULAWESI SELATAN SULAWESI TENGGARA
1828, 1969 1967, 2011
MALUKU UTARA
1936, 1975, 1994, 2003, 2013, 2015
Makasar Thrust dan Sesar Walanae Sesar Lawanopo dan Tolo Thrust Subduksi (sebelah Timur), Sesar Laut Maluku Timur, Sesar Sorong Barat, dan Sesar Lokal Jailolo
MALUKU SELATAN
1852, 1932, 1983
Subduksi (sebelah Utara), Sesar Sorong Barat dan Seram Selatan Thrust
KEPULAUAN ARU KEPALA BURUNG - PAPUA UTARA NABIRE JAYAPURA WAMENA
1920, 1938, 1975
Subduksi (Sebelah Tenggara), Wetar Back-arc
1914, 1919, 1979, 1996, 2002, 2010
Papua Utara Thrust, Manokwari Trench dan Sesar Sorong Timur, Ransiki dan Yapen
1989, 1994, 2004 1971, 1976 1976, 2000, 2002
Subduksi (sebelah Barat), Sesar Tarera-Aidun dan Waipago Papua Utara Thrust dan Membrano Thrust Belt Highland Thrust Belt
202 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
89
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
PETA RAWAN TSUNAMI
PETA RAWAN TSUNAMI
90
203 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
TABELTSUNAMI KAWASANINDONESIA RAWAN TSUNAMI INDONESIA TABEL KAWASAN RAWAN WILAYAH NANGGROE ACEH DARUSSALAM SUMATERA UTARA SUMATERA BARAT BENGKULU LAMPUNG - BANTEN JAWA BARAT-TENGAH BAGIAN SELATAN JAWA TIMUR BAGIAN SELATAN
SEJARAH TSUNAMI 1837, 1861, 1885, 1886, 1907, 1922, 1948, 1967, 2004
DAERAH TERLANDA P. Simeulue, Pantai Barat NAD (Lhok Nga, Calang, Meulaboh), Lhokseumawe
1852, 1861, 1907, 1935, 2004
Pulau Nias, Pantai Barat Sumatera Utara (Singkil, Sibolga)
1797, 1799, 1833, 1861, 2010
Kep. Mentawai, Pantai Barat Sumatera Barat (termasuk Siri Sori) Pulau Enggano, Pantai Barat Bengkulu (termasuk Kota Bengkulu dan Manna) Pantai Selatan Lampung, Pantai Barat Banten Pantai Selatan Jawa Barat – Tengah Pantai Selatan Jawa Timur Pantai Selatan Bali Pantai Selatan Lombok, Sumbawa , dan Pantai utara Bima Pantai Utara Flores, Pulau Babi, Pantai Utara P. Timor (Atapupu), dan Pantai Selatan Sumba. Manado, Bitung, Sangihe, dan Talaud.
1833, 1851, 1931, 1958, 2007
BALI NUSA TENGGARA BARAT
1861, 1883, 1930, 1963 1840, 1883, 1904, 1957, 2006 1818, 1859, 1921, 1925, 1994 1818, 1848, 1917, 1925, 1930, 1985, 1994 1618, 1815, 1818, 1836, 1977
NUSA TENGGARA TIMUR
1814, 1820, 1857, 1903, 1975, 1979, 1982, 1992
SULAWESI UTARA
1845, 1857, 1858, 1859, 1871, 1883, 1917, 1936
SULAWESI TENGAH-PALU SULAWESI SELATAN SULAWESI TENGGARA
1928, 1968, 1996, 2000, 1927, 1928, 1938, 1968, 1996 Pulau Peleng, Banggai Kepulauan, Luwuk, Palu, Teluk Tomini, Tambu, Mupaga, Toli-toli, Donggala, dan Tojo 1820, 1967, 1969 Bulukumba, Tinambung, dan Majene 1889, 1907, 1910, 1936, 1820 Pantai Kendari
MALUKU UTARA
1673, 1771, 1846, 1848, 1854, 1859, 1860, 1900, 1994 Sanana, Ternate, Tidore, Halmahera, dan Pulau Obi
MALUKU SELATAN PAPUA UTARA KALIMANTAN SELATAN BAGIAN TIMUR SANGATA
1629, 1657, 1659, 1673, 1674, 1708, 1763, 1775, 1802, 1841, 1851, 1852, 1861, 1876, 1899, 1950, 1966, 1983, 1996 1900, 1914, 1957, 1979, 1996 1957, 1994 1921
Bandanaira, P. Seram, P. Buru, Pantai Talaga, P. Banda, P. Kai, P. Tual Yapen, Biak, Supiori, Oranbari, dan Ransiki Langadai danLoeri Daerah Sekuran
204 www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
91
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL
MENGUCAPKAN
SELAMAT HARI RAYA
Idul Fitri
MOHON MAAF LAHIR DAN BATHIN 92
#EnergiBerkeadilan www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
#EnergiBerkeadilan
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm
93
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA
Buku Acuan Kesiapan Sektor ESDM MenJALANI RAMADHAN dan Menghadapi IDUL FITRI 1438 H
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL Sekretariat Jenderal Biro Perencanaan Jl. Medan Merdeka Selatan 18 Jakarta Email :
[email protected]
94
www.esdm.go.id
@KementerianESDM
Kementerian Energi dan Sumber Daya Mineral
Kementerian ESDM
@kesdm