RENCANA PENGEMBANGAN GRID PULAU KECIL SOLAR PV DAN PV DIESEL DI PROVINSI NUSA TENGGARA TIMUR
PETA PROVINSI NUSA TENGGARA TIMUR
Kotamadya
1
Kabupaten
21
Kecamatan
306
Desa/Kelurahan
3268
Jumlah Jiwa
5.356.567
GEOGRAFIS : KEPULAUAN
NAMA PULAU TERDEPAN DI PROPINSI NUSA TENGGARA TIMUR (Perbatasan T.leste & Australia) Pulau Batek (Kab. Kupang)
Pulau Manggudu (Kab. Sumba Timur)
Pulau Dana Sabu ( Kab. Sabu Raijua)
Pulau Dana Rote (Kab. Rote Ndao)
Ikonik PROVINSI NUSA TENGGARA TIMUR
PT. PLN (Persero) Wil. NTT AREA FBT
AREA FBB
Pembangkit
Tarif
SEKTOR NTT
AREA SUMBA
AREA KUPANG
PELANGGAN
Unit Area
2008
2009
2010
2011
2012
2013
Growth (%) Flores Bagian Barat Growth (%) Sumba Growth (%) Flores Bagian Timur Growth (%) Wilayah NTT
120.595 8,9% 58.807 9,8% 21.037 11,8% 45.917 12,7% 246.356
122.331 1,4% 60.539 2,9% 21.581 2,6% 49.104 6,9% 253.555
130.331 6,5% 65.729 8,6% 24.341 12,8% 54.041 10,1% 274.442
176.808 35,7% 89.881 36,7% 31.866 30,9% 77.471 43,4% 376.026
243.029 37,5% 127.962 42,4% 57.449 80,3% 95.603 23,4% 524.043
269.821 11,0% 145.835 14,0% 48.348 -15,8% 99.842 4,4% 563.846
Growth (%)
10,0%
2,9%
8,2%
37,0%
39,4%
7,6%
Kupang
Kondisi Kelistrikan PLN Wilayah NTT 02 FEBRUARI 2016 SISTEM ADONARA
SISTEM LEMBATA
SISTEM KALABAHI
SISTEM AESESA
SISTEM LARANTUKA
D. MAMPU : 7,28 MW
D. MAMPU : 2,55 MW
D. MAMPU : 3,70 MW
D. MAMPU : 2,70 MW
D. MAMPU : 3,10 MW
D. MAMPU : 4,92 MW
B. MALAM : 8,47 MW
B. MALAM : 2,29 MW
B. MALAM : 4,17 MW
B. MALAM : 3,39 MW
B. MALAM : 2,91 MW
B. MALAM : 4,16 MW
DEFISIT
CAD.
DEFISIT
DEFISIT
CAD.
CAD.
SISTEM RUTENG
: -1,19 MW
: 0,26 MW
SISTEM LABUAN BAJO
: -0,47 MW
: -0,69 MW
: 0,19 MW
SISTEM ATAMBUA
AREA FBB
D. MAMPU : 4,40 MW
D
D. MAMPU : 7,60 MW
D
D
B. MALAM : 7,90 MW
D
B. MALAM : 4,20 MW CAD.
D
D
D
: 0,20 MW
D
DEFISIT
D D
D. MAMPU : 2,59 MW D
D. MAMPU : 5,00 MW
D
D
DEFISIT
D
D
CAD.
AREA SUMBA
D
B. MALAM : 5,00 MW CAD.
SISTEM SABU
SISTEM MAUMERE
: 0,36 MW
SISTEM SO’E D. MAMPU : 5,12 MW
D
SISTEM ENDE
: 0,20 MW
B. MALAM : 4,41 MW
: -1,20 MW
SISTEM WAINGAPU
CAD.
D. MAMPU : 4,77 MW
D
AREA KUPANG
SISTEM WAIKABUBAK + WAITABULA D. MAMPU : 5,32 MW
DEFISIT
B. MALAM : 2,39 MW
SISTEM KEFAMENANU
D
: -0,60 MW
B. MALAM : 6,52 MW
: - 0,30 MW
SISTEM BETUN
AREA FBT
SISTEM BAJAWA
B. MALAM : 5,60 MW
: 0,76 MW
SISTEM ROTE
: 0,12 MW
SISTEM KUPANG D. MAMPU : 49,23 MW
D. MAMPU : 6,35 MW
D. MAMPU : 7,35 MW
D. MAMPU : 11,50 MW
D. MAMPU : 1,28 MW
D. MAMPU : 3,50 MW
B. MALAM : 5,64 MW
B. MALAM : 9,49 MW
B. MALAM : 10,95 MW
B. MALAM : 1,16 MW
B. MALAM : 3,28 MW
B. MALAM : 53,40 MW
CAD.
DEFISIT
CAD.
CAD.
CAD.
DEFISIT
: 0,71 MW
: -2,14 MW
: 0,55 MW
: 0,12 MW
: 0,22 MW
: -4,17 MW
Status Komposisi Pembangkit PLN NTT ( Desember 2015) 1. Berdasarkan Pembangkit
• Pasokan energi primer didominasi bahan bakar fosil : 59,12 % dari BBM PLTD Sewa, 20,49 % dari BBM PLTD sendiri, 13,98 % dari PLTU, 3,53 % dari PLTP, 2,80 % dari PLTM/PLTMH, 0,07 % dari PLTS 2. Berdasarkan Area Kerja
• Pasokan Energi Listrik Berdasarkan Area Kerja yang didominasi oleh : 1. Area Kupang : 58,28 % 2. Area FBB : 20,07 % 3. Area FBT : 14,44 % 4. Area Sumba : 7,21 %
2020 2019 2018 2017 2016
2013 2012
2011 2010 26,40%
41,55%
53,22%
54,77%
2014
Okt 2015
58,53%
58,44%
63,2%
65,7%
68,7%
70,9%
73,2%
PEMETAAN PER KABUPATEN Manggarai Barat 45,706 KK 2,990 plg RT 96 Desa
Nagekeo
Manggarai&Ma nggarai Timur
Sikka
27,730 KK
112,225 KK
5,299 plg RT
14,865 plg RT
Flores Timur
Alor
51,560 KK
39,549 KK
22,490 plg RT
10,354 plg RT
117 Desa
112 Desa
60,583 KK 22,400 plg RT
42 Desa
65 Desa
175 Desa
Belu
Lembata
57,051 KK 5,254 plg RT 66 Desa
95,954 KK
TTU
Sumba Barat Daya
Ngada 29,172 KK
23,210 KK
Ende
15,172 plg RT
27,154 plg RT
36 Desa
97 Desa
123 Desa
~
10,210 plg RT
8,642 plg RT
51,716 KK
11,782 plg RT
47,212 KK
72 Desa
67 Desa
Kupang&Sabu 85,509 KK
Sumba Barat&Tengah
37,361 KK 5,107 plg RT
Sumba Timur
14,625 plg RT
49,549 KK
72 Desa
~ TTS
12,259 plg RT 86 Desa
53 Desa
Rote Ndao 25,812 KK
7,604 plg RT
Desa Belum Berlistrik Proyeksi KK 2011 menurut BPS Jml plg Rumah Tangga (III-09 Juni 2011)
36 Desa
Kota Kupang
90,712 KK
63,518 KK
15,071 plg RT
56,532 plg RT
125 Desa
-
• Rasio Elektrifikasi s/d OKTOBER 2015 REALISASI
TARGET 2015 PROPINSI
KABUPATEN
1
2
Oct-15
RE (%)
JUML. PEL.
JUML. PEL.
JUML. PEL.
RE (%)
RE (%)
RT PLN
RT NON PLN
RT TOTAL
PLN
TOTAL
9
10
11
12=10+11
13=10/9
14=12/9
JUMLAH RUMAH TANGGA TOTAL 8=6/3
Kota Kupang
99.32
93,090
90,137
447
90,584
96.83
97.31
Kupang
55.90
69,217
33,299
2,592
35,891
48.11
51.85
Sabu Raijua
23.97
25,028
4,946
916
5,862
19.76
23.42
Timor Tengah Selatan
49.16
109,322
43,705
4,670
48,375
39.98
44.25
Timor Tengah Utara
69.25
57,132
30,309
6,600
36,909
53.05
64.60
Belu & Malaka
45.43
81,484
33,945
3,510
37,455
41.66
45.97
Alor
68.30
46,063
27,670
3,160
30,830
60.07
66.93
Rote Ndao
81.42
32,184
22,974
2,309
25,283
71.38
78.56
Ende
KENDALA : 1
• Banyaknya KK tidak sebanding dengan banyaknya rumah, misalnya : 2-3 KK dalam 1 rumah
2
• Pelanggan Tersambung untuk 1 kms SUTM sebanyak : 105 pelanggan (investasi = ± Rp. 300 jt)
3
•Pelanggan Tersambung untuk 1 kms SUTR sebanyak : 104 pelanggan (investasi = ± Rp. 200 jt)
4
•Pelanggan Tersambung untuk 1 Transformator sebanyak : 174 pelanggan (investasi = ± Rp. 125 jt)
5
•Sumber daya ekomomi masyarakat (Pertanian, pedangan tenun ikat, pabriakan es batu)
6
•Banyak daerah yang harus melintasi atau melewati kawasan hutan yang membutuhkan proses perijinan
79.28
56,436
39,986
3,119
43,105
70.85
76.38
97.87
33,247
26,068
2,015
28,083
78.41
84.47
57.37
27,122
14,445
1,613
16,058
53.26
59.21
59.49
68,790
27,576
4,312
31,888
40.09
46.36
Manggarai Timur
39.94
57,311
19,116
6,892
26,008
33.36
45.38
Manggarai Barat
46.28
53,982
14,928
6,568
21,496
27.65
39.82
Sikka
66.38
68,902
39,658
3,246
42,904
57.56
62.27
Flores Timur
92.20
56,477
43,977
7,543
51,520
77.87
91.22
Lembata
75.17
30,984
17,018
4,842
21,860
54.92
70.55
Sumba Timur
50.99
51,599
21,712
3,305
25,017
42.08
48.48
Sumba Barat
42.83
21,876
7,670
692
8,362
35.06
38.22
Sumba tengah
29.75
12,859
3,302
653
3,955
25.68
30.76
Sumba Barat Daya
29.63
51,734
13,225
953
14,178
25.56
27.41
2
TOTAL
61.81
1,104,837
575,666
69,957
645,623
52.10
58.44
3
NUSA Ngada TENGGARA Nagekeo TIMUR Manggarai
DUKUNGAN : • Penguatan / Penambahan Alokasi Anggaran 1
• Kemudahan dan percepatan perijinan • Komunikasi politik anggaran
RENCANA PENGEMBANGAN SISTEM KELISTRIKAN PLN NTT 2016 - 2025 ============================= ======= ======== ======== ======== ======== ======== ======== ============================ ========= ========= Calendar Year 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 ============================= ======= ======== ======== ======== ======== ======== ======== ============================ ========= ========= Total Population (10^3) Jumlah KK (10^3) - Growth Rate (%) Growth of Total GDP (%) Electrification Ratio (% )
5,037 1,104.51
5,120 1,131.61
5,204 1,158.70
5,287 1,185.52
5,372 1,212.34
5,456 1,238.60
5,541 1,264.87
5,627 1,291
5,713 1,317
5,799 1,343
5,885 1,369
5,971 1,394
1.3
1.7
1.6
1.6
1.6
1.6
1.6
1.5
1.5
1.5
1.5
1.5
5.0 55.5
5.8 57.8
6.6 63.2
7.1 65.7
7.5 68.7
8.0 70.9
6.4 73.2
6.4 76.3
6.4 79.3
6.4 82.4
6.4 85.5
6.4 88.6
Energy Sales (GWh)
702.3
772.1
851.0
941.4
1,044.2
1,156.9
1,259.3
1,369.0
1,485.2
1,608.3
1,738.6
1,876.7
9.8
9.9
10.2
10.6
10.9
10.8
8.8
8.7
8.5
8.3
8.1
7.9
424.6 178.9 73.4 25.4
466.9 196.8 80.3 28.0
511.4 217.6 89.3 32.7
560.7 240.8 100.1 39.8
617.1 266.5 112.7 47.9
676.5 295.5 127.6 57.3
730.2 321.2 140.3 67.6
790.1 348.3 154.0 76.5
853.1 377.0 168.9 86.2
919.4 407.3 185.1 96.5
989.3 439.2 202.6 107.6
1,062.9 473.0 221.4 119.4
613.6
683.6
754.1
831.6
921.3
1,012.3
1,095.9
1,191.9
1,292.7
1,398.5
1,509.8
1,626.8
437.1 107.5 54.1 15.0
492.7 116.1 57.8 17.1
545.5 125.6 62.3 20.6
603.3 136.0 67.6 24.6
671.0 147.2 73.7 29.4
737.2 159.4 80.8 34.9
798.8 170.7 86.9 39.5
871.6 182.4 93.5 44.4
947.9 194.6 100.5 49.6
1,027.7 207.3 108.1 55.3
1,111.5 220.6 116.3 61.4
1,199.4 234.5 125.0 67.9
16.6 730,287
11.4 778,656
10.3 864,864
10.3 919,568
10.8 982,097
9.9 1,035,550
8.3 1,090,571
8.8 1,157,658
8.5 1,226,200
8.2 1,296,153
8.0 1,367,729
7.8 1,440,939
613,354 30,104 86,692 137
653,818 31,616 93,084 137
732,100 33,132 99,492 140
778,839 34,655 105,931 143
833,364 36,186 112,400 147
878,767 37,725 118,907 151
925,688 39,274 125,453 156
984,649 40,828 132,022 159
1,045,035 42,388 138,615 163
1,106,822 43,949 145,214 167
1,170,224 45,512 151,822 171
1,235,241 47,079 158,445 175
- Growth Rate (%) -- Residential -- Commercial -- Public -- Industrial
Power Contracted (MVA) -- Residential PLN -- Commercial -- Public -- Industrial - Growth Rate (%)
Number of Customer -- Total Residential
-- Commercial -- Public -- Industrial - Growth Rate (%)
Total Production (GWh)
15.2
6.6
11.1
6.3
6.8
5.4
5.3
6.2
5.9
5.7
5.5
5.4
783.8
873.6
975.4
1,088.1
1,215.0
1,346.9
1,453.0
1,566.8
1,701.9
1,844.4
1,980.1
2,132.6
Energy Requirement (GWh) 749.5 820.6 903.6 998.6 1,106.7 1,224.9 1,332.0 1,446.7 1,568.1 1,697.1 1,833.7 1,979.4 Station Use (%) 3.3 6.1 7.4 8.2 8.9 9.1 8.3 7.7 7.9 8.0 7.4 7.2 T & D Losses (%) +) 6.30 5.91 5.82 5.73 5.65 5.55 5.46 5.37 5.29 5.24 5.19 5.19 Load Factor (%) 55.4 55.1 55.2 55.3 55.3 55.4 55.5 55.5 55.6 55.7 55.7 55.8 Peak Load (MW) 161.4 180.8 201.7 224.71 250.6 277.5 299.0 322.02 349.4 378.2 405.5 436.21 ============================= ======= ======== ======== ======== ======== ======== ======== ============================ ========= =========
PERKEMBANGAN DAN TARGET ENERGY MIX PEMBANGKIT TENAGA LISTRIK PLN WILAYAH NTT TAHUN 2015 – 2020 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 2013
URAIAN BBM
2013
2014
2015
2014
2016
2015
2017
2016
2018
2017
2019
2020
2018
2019
2020
96%
83%
80%
72%
54%
27%
16%
17%
Batubara
0%
10%
14%
16%
24%
42%
42%
38%
PLTMG
0%
0%
0%
0%
6%
11%
21%
22%
Panas Bumi
2%
4%
4%
5%
6%
7%
8%
10%
PLTA / PLTMH
2%
3%
3%
7%
8%
12%
12%
11%
0.02%
0.05%
0.07%
0.5%
1.0%
1.3%
1.5%
1.8%
PLTS
PERENCANAAN DAN PENGEMBANGAN PLTS
5 PLTS IPP On grid
6 PLTS Off grid 1 PLTS smart grid (Bilacenge) s/d s/d
1 PLTS on grid (Lembata)
s/d s/d s/d
2 PLTS hybrid (BPPT& PEMDA)
2008
2009
2011
2013
2015
94 PLTS Off grid
PENGEMBANGAN PLTS DI PLN WILAYAH NTT PLTS IPP ON GRID MAUMERE KAP. 1 MWp
PLTS IPP ON GRID ENDE KAP. 1 MWp
PLTS OFF GRID SOLOR BARAT KAP. 275 KWp
PLTS OFF GRID NULE - ALOR KAP. 250 KWp
PLTS ON GRID LEMBATA KAP. 200 KWp
PLTS IPP ON GRID LABUAN BAJO KAP. 1 MWp
PLTS OFF GRID PURA - ALOR KAP. 175 KWp
S S
S S S S
S
S
BEROPERASI
PLTS ON GRID BILACENGE KAP. 500 KWp
S
PLTS IPP ON GRID ATAMBUA KAP. 1 MWp
S
S
RENCANA S S
S
PLTS ON GRID SALURA KAP. 150 KWp
PLTS OFF GRID WINI KAP. 60 KWp
S
PLTS IPP ON GRID SUMBA TIMUR KAP. 1 MWp
S
PLTS OFF GRID RAIJUA KAP. 150 KWp
PLTS OFF GRID NEMBERALA KAP. 50 KWp
PLTS OFF GRID SEMAU KAP. 450 KWp
PLTS IPP ON GRID KUPANG KAP. 5 MWp
L/O/G/O EVALUASI PENGOPERASIAN PLTS IPP KUPANG 5 MWp
PT PLN (PERSERO) WILAYAH NTT
LATAR BELAKANG 1
PROSES PEMBANGUNAN PLTS IPP KUPANG 5 MWP
2 HAL-HAL YANG DIPERHATIKAN PENGOPERASIAN PLTS 3 EVALUASI PEMBEBANAN PLTS IPP KUPANG 4
HASIL PRODUKSI PLTS IPP KUPANG
5
KESIMPULAN DAN SARAN
6
IMPLEMENTASI P2MS
www.themegallery.com
Proses Pembangunan PLTS IPP Kupang 5 MWp No 1 2 3 4 5 6 7 8
9 10 11
Kegiatan
Pelaksana
EBTKE Penetapan pemenang Penugasan Pembelian Tenaga Listrik Kepada PT MESDM PLN (Persero) Pengurusan Izin-izin yang dibutuhkan (Status Tanah, PT LEN Izin Lokasi, Izin Lingkungan, dll) PT LEN Studi Interkoneksi PLTS IPP Kupang 5 MWp Rekomendasi Studi Interkoneksi PLTS IPP Kupang PT PLN Wil NTT 5 MWp Izin Usaha Penyedian Tenaga Listrik Sementara DJK untuk PT Len Izin Prinsip Pembelian Tenaga Listrik PLTS IPP DIREKSI PLN Kupang 5 MWp PT LEN Penyerahan Jaminan Pelaksanaan Tahap I PT PLN NTT – TTD Perjanjian Pembelian Energi Listrik PT LEN PT PLN NTT – Ujicoba Operasi dengan Sistem Kupang PT LEN Presiden RI Peresmian PLTS IPP Kupang 5 MWp
www.themegallery.com
Aktual 24-Jan-14 20-Okt-14
21-Nov-14 03-Des-14 22-Des-14 22-Des-14
09-Jan-15 08-Des-15 27-Des-15
Ket
Hal-hal yang harus diperhatikan Pada Pengoperasian PLTS IPP Kupang 5 MWp 1. Asumsi Interpolasi Dari 20 kW Menjadi 5 MW Perbedaan output daya selama 1 menit dapat mencapai 44.4% Pada sistem 5 MW, perbedaan ini setara dengan fluktuasi sebesar 2,22 MW dalam waktu 1 menit
Dimungkinkan adanya perubahan yang lebih besar
2. Pembahasan Standard Operating Procedure (SOP)
www.themegallery.com
BEBAN SISTEM KUPANG pada TANGGAL 19 DESEMBER 2015 DM : 46,1 MW BP Siang : 43,9 MW BT Siang : 37,2 MW
PLTD SEWA
PLTU
PLTS
Beban Waktu
PLTU BOLOK PLTD KUANINO PLTS TENAU PLTD SEWA PLTS IPP KUPANG TOTAL BEBAN FREKUENSI (HZ)
1.00 13,410 2,000 25,823 41,233 50.07
www.themegallery.com
2.00 13,400 2,300 25,289 40,989 50.13
3.00 13,500 2,300 22,401 38,201 50.11
4.00 13,700 2,500 21,262 37,462 50.03
5.00 13,420 2,300 21,285 37,005 50.03
6.00 13,520 2,300 20,085 35,905 50.10
7.00 13,340 2,300 20,048 1,000 36,688 50.18
8.00 13,500 2,500 20,425 1,200 37,625 50.22
9.00 13,550 2,300 23,030 900 39,780 50.11
10.00 13,650 2,500 23,176 1,800 41,126 50.00
11.00 13,500 2,100 23,150 2,600 41,350 50.23
12.00 13,240 3,300 23,090 2,300 41,930 50.31
13.00 13,500 2,100 23,663 4,300 43,563 50.11
14.00 13,500 3,200 23,591 3,400 43,691 50.17
15.00 13,200 1,200 2,200 24,650 2,900 44,150 50.21
16.00 13,200 1,200 2,000 25,900 1,200 43,500 49.81
17.00 13,100 2,300 27,110 700 43,210 50.22
18.00 13,050 4,400 28,565 46,015 49.99
19.00 13,200 2,200 4,500 30,750 50,650 49.81
20.00 13,380 2,200 4,500 30,750 50,830 50.00
21.00 13,500 2,200 4,500 30,750 50,950 49.88
22.00 13,300 2,200 4,500 30,750 50,750 50.01
23.00 13,000 2,200 4,100 26,647 45,947 50.01
24.00 13,420 4,300 26,359 44,079 49.83
Evaluasi Pembebanan PLTS IPP KUPANG 5 MWp Tanggal, 19 Desember 2015 Waktu 6:00 6:15 6:30 6:45 7:00 7:15 7:30 7:45 8:00 8:15 8:30 8:45 9:00 9:15 9:30 9:45 10:00 10:15 10:30 10:45 11:00 11:15 11:30 11:45 12:00 12:15 12:30 12:45 13:00 13:15 13:30 13:45 14:00 14:15 14:30 14:45 15:00 15:15 15:30 15:45 16:00 16:15 16:30 16:45 17:00 17:15 17:30
P ( KW ) 278 352 690 1,003 1,300 914 2,210 1,800 1,300 1,200 900 635 937 1,700 2,100 2,100 2,600 2,600 2,600 4,000 4,200 4,600 4,200 4,200 3,500 4,100 4,100 4,200 4,200 3,900 3,900 3,800 3,400 2,000 1,500 2,520 3,300 2,130 1,850 1,210 1,820 936 916 880 705 418 278
F ( Hz )
KET
50.10 50.10 50.10 50.10 50.20 50.20 50.20 50.20 50.20 50.20 50.10 50.10 50.10 50.10 50.10 50.10 50.10 50.20 50.00 50.00 50.20 50.20 50.30 50.10 50.20 50.10 50.20 50.20 50.20 50.10 50.10 50.20 50.30 50.10 49.80 50.20 50.30 50.20 50.10 50.20 50.30 49.90 50.00 50.00 50.10 50.20 50.10
5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp 5 MWp
www.themegallery.com
Catatan : - DM : 46,1 MW - BP Siang : 43,9 MW - BT Siang : 37,2 MW
Evaluasi Produksi kWh dalam 1 Tahun Sesuai Data Tgl 19 Des. 2015 - Total Produksi : 27.540 kWh - Radiasi Matahari : 5,5 kWh/m2/hari - Jadi dalam setahun : 9,914 MWh
Evaluasi Pembebanan PLTS IPP KUPANG 2 MWp Tanggal, 20 Januari 2016 Waktu 6:00 6:15 6:30 6:45 7:00 7:15 7:30 7:45 8:00 8:15 8:30 8:45 9:00 9:15 9:30 9:45 10:00 10:15 10:30 10:45 11:00 11:15 11:30 11:45 12:00 12:15 12:30 12:45 13:00 13:15 13:30 13:45 14:00 14:15 14:30 14:45 15:00 15:15
P ( KW )
150 232 350 450 572 789 907 988 1,079 1,167 1,234 1,337 1,339 1,371 1,448 1,482 1,529 1,584 1,590 1,604 1,620 1,648 1,629 1,653 1,653 1,576 1,595 1,546 1,512 1,449 1,393 1,313 1,308 1,256 1,220
F ( Hz )
KET
50.20 50.30 50.30 50.20 50.00 50.10 50.10 49.90 50.20 50.00 50.10 50.10 50.10 50.00 50.20 50.10 50.10 50.10 50.10 50.00 50.00 50.00 50.20 50.20 50.10 50.10 50.10 50.10 50.10 50.00 50.00 50.00 50.00 49.90 50.00
2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp
www.themegallery.com
Catatan : - DM : 52,25 MW - BP Siang : 50,60 MW - BT Siang : 40,11 MW
Evaluasi Produksi kWh dalam 1 Tahun Sesuai Data Tgl 20 Jan. 2016 - Total Produksi : 10.261 kWh - Radiasi Matahari : 5,12 kWh/m2/hari - Jadi dalam setahun : 3,687 MWh
Evaluasi Pembebanan PLTS IPP KUPANG 2 MWp Tanggal, 21 Januari 2016 Waktu 6:00 6:15 6:30 6:45 7:00 7:15 7:30 7:45 8:00 8:15 8:30 8:45 9:00 9:15 9:30 9:45 10:00 10:15 10:30 10:45 11:00 11:15 11:30 11:45 12:00 12:15 12:30 12:45 13:00 13:15 13:30 13:45 14:00 14:15 14:30 14:45 15:00
P ( KW )
164 229 317 450 583 688 800 900 1,010 1,100 1,176 1,258 1,336 1,423 1,486 1,806 1,853 1,827 1,750 596 1,820 1,010 1,902 1,823 1,822 1,829 649 450 1,543 640 1,553 1,470 1,796 1,495
F ( Hz )
KET
50.40 50.30 50.20 50.00 49.90 50.10 50.00 50.10 50.00 50.00 50.00 50.00 50.10 50.20 50.10 50.30 50.20 50.00 50.10 50.10 50.30 50.20 50.10 50.00 50.00 50.20 50.20 50.00 50.10 49.80 50.00 49.90 50.00 49.90
2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp 2 MWp
www.themegallery.com
Catatan : - DM : 52,25 MW - BP Siang : 50,60 MW - BT Siang : 40,11 MW
Evaluasi Produksi kWh dalam 1 Tahun Sesuai Data Tgl 21 Jan. 2016 - Total Produksi : 10.261 kWh - Radiasi Matahari : 5,12 kWh/m2/hari - Jadi dalam setahun : 3,687 MWh
Proyeksi Produksi PLTS KUPANG 5 MWp Evaluasi Produksi kWh dalam 1 Tahun Sesuai Data Tgl 19 Des. 2015 - Total Produksi : 27.540 kWh - Radiasi Matahari : 5,5 kWh/m2/hari - Jadi dalam setahun : 9,914 MWh Evaluasi Produksi kWh dalam 1 Tahun Sesuai Data Tgl 20 Jan. 2016 - Total Produksi : 11.027 kWh - Radiasi Matahari : 5,54 kWh/m2/hari - Jadi dalam setahun : 3,986 MWh Evaluasi Produksi kWh dalam 1 Tahun Sesuai Data Tgl 21 Jan. 2016 - Total Produksi : 10.261 kWh - Radiasi Matahari : 5,12 kWh/m2/hari - Jadi dalam setahun : 3,687 MWh
www.themegallery.com
Hasil Produksi PLTS KUPANG 5 MWp untuk Operasi 2 MWp
PRODUKSI 20000 18000
16000 14000 12000 10000 8000 6000 4000 2000 0
Total Produksi Bulan Januari 2016 : 231,834 KWH www.themegallery.com
Kesimpulan dan Saran PLTS IPP Kupang 5 MWp Pengoperasian PLTS IPP Kupang 5 MWp tercapai apa bila sistem Kupang pada siang hari tidak mengalami pemadaman bergilir. Pembangkit pada sistem Kupang harus memenuhi N-1, sehingga PLTS 5 MWp dapat dioperasikan secara optimal. Diusulkan untuk menjaga keandalan sistem Kupang pada saat cuaca mendung harus mempunyai back up daya (batere)
www.themegallery.com
IMPLEMENTASI P2MS
www.themegallery.com
TERIMA KASIH