RECLAMATION AND REVEGETATION (AFTER COAL MINING OPERATION) (PROBLEMS AND SOLUTION )
Dr. Setiadi Dr.Yadi Yadi Setiadi Mined Land Rehabilitation Specialist Faculty of Forestry, Bogor Agricultural University Kampus IPB, Darmaga, Bogor
[email protected]. 08111102302
Tropical Rain Forest Function
Conserve soil and water Supporting biodiversity Natural resources Control climatic conditions Water cycle processes Carbon sequestration Genetic resources Habitat for flora and fauna
Illegal logging Forest fires Agriculture development Timber plantations Estate crops plantations Shifting cultivation Transmigration Mining Operations
Character Degraded Mined Land
Loss of vegetation Disturbed ecosystem Erosion and run-off (sedimentation, contamination) Reduce native species biodiversity Damages to wildlife habitat Damages of watershed area Changes natural landscape
Exposed Loss of root and crown function No vegetation Loss of supporting biodiversity No top soil and sub-soil Loss of land productivity Land stability Land slides and erosion Poor soil poor survival and poor growth performance
Government Regulation for Mined Land Reclamation and Revegetation FORESTRY DEPT NO change the structure and function of the forest Conduct reclamation and reforestation Protect the forest from illegal logging, and land occupancy
ENVIRONMENTAL DEPT Conduct mitigation measures for the significant impacts : (contamination of heavy metals, aggressive occupation of alien species) Minimize forest destruction (foot print) Conduct Biological conservation ENERGY AND MINERAL RESOURCES DEPT Land stability and Erosion control Develop planning for reclamation and mine closure
Successful Standard Criteria for Reclamation and Revegetation Acuan PerMenESDM No.07 Tahun 2014 No. Kegiatan Reklamasi / Obyek Kegiatan 1. Penatagunaan Lahan
Parameter
1. Luas area yang ditata (Ha) 2. Stabilitas timbunan (%) 1. Luas area yang ditimbun (Ha) b. Penimbunan kembali lahan bekas tambang 2. Stabilitas timbunan (%) 1. Luas area yang ditebar (Ha) c. Penebaran tanah zona pengakaran 2. pH tanah 1. Saluran drainase (%) d. Pengendalian erosi dan pengelolaan air 2. Bangunan pengendali erosi (%) 3. Kolam pengendap sedimen (%) 2. Revegetasi dan Pekerjaan Sipil 1. Pengelolaan material (% Volume) a. Pengelolaan material pembangkit AAT 2. Pengelolaan AAT (%) 1. Luas area penanaman (Ha) 2. Jenis tanaman - Cover crop b. Penanaman - Fast growing - Tanaman lokal 3. Pertumbuhan tanaman (%) 3. Penyelesaian Akhir a. Penutupan tajuk 1. Pemupukan b. Pemeliharaan 2. Pengendalian gulam, hama&penyakit 3. Penyulaman a. Penataan permukaan lahan
Rencana
Standar Keberhasilan Pelaksanaan > 80 % tidak ada longsoran > 80 % tidak ada longsoran > 75 % 5- 6 tidak terjadi erosi tidak terjadi alur erosi sesuai BML sesuai rencana sesuai BML > 80 % sesuai rencana sesuai rencana sesuai rencana sesuai rencana > 80 % > 80 % sesuai kebutuhan sesuai kebutuhan sesuai kebutuhan
Standard Criteria for Revegetation success No.
Kriteria / Indikator / Parameter
Checklist : M = Memenuhi ; TM = Tidak Memenuhi 1 Penataaan Permukaan Lahan a. Pengisian kembali lubang bekas tambang b. Luas areal yang ditata c. Kestabilan d. Penaburan tanah pucuk e. pH Tanah 2 Pengendalian Erosi dan Sedimentasi a. Bangunan konservasi tanah - Jumlah fisik bangunan - Kondisi bangunan b. Penanaman cover crop c. Erosi dan sedimentasi d. Pengelolaan Material Pembangkit AAT - Pengelolaan Material - Kolam Pengendap Sedimen 3 Revegetasi a. Luas penanaman b. Persentase tumbuh c. Jumlah tanaman d. Komposisi jenis - Tanaman fast growing - Tanaman lokal e. Kesehatan tanaman f. Penutupan tajuk g. Pemeliharaan
PerMenHut No. 60 Tahun 2009 Standar keberhasilan
M
TM
PerMenESDM N0. 07 Tahun 2014 Standar keberhasilan
M
TM
Keterangan
> 80% > 80% longsor (< 5%)
sesuai rencana sesuai rencana
sesuai document sesuai document
tidak ada longsoran
presentase kejadian longsor
> 80% -
-
> 75% > 5-6
sesuai document sesuai analisis tanah
-
tidak terjadi erosi sesuai rencana tidak terjadi erosi sesuai rencana kualitas air sesuai BML
Saluran drainase, checkdam, beronjong, turap, dll. (Kesesuaian dalam jumlah dan spesifikasi) & fungsi sesuai document persentase luas erosi sesuai document pH, TSS, Al, Fe, Mn
≥ 90% sesuai document berfungsi > 80% erosi ≤ 5% -
-
-
> 80 % > 80 % ≥ 625 phn/Ha jenis lokal ≥ 40% > 80 % -
-
-
-
-
> 80 % > 80% sesuai document Tanaman lokal ≥ 40% sesuai rencana sesuai rencana > 80% > 80%
-
-
-
sesuai kebutuhan
-
-
-
-
sesuai document secara sampling sesuai document sesuai document Model 1 {hanya Pioner (Lokal Potensial)} Model 2 {Pioneer dan Primer (lokal)} secara sampling secara sampling pemupukan ; pengendalian gulma, hama&penyakit ; penyulaman
Planning Consideration Land conditions (derelict) Status of forest function (Forestry or APL )
Government regulations (Revegetation Planning, Guide line, Criteria)
Post mining land use (multi stakeholde, AMDAL)
Planting strategies
Setiadi.Yadi. 2012
FIELD SURVEY Trees species selection and propagation • Suitable, potential local species, regulasi
Soil amendments • Balance nutrients, improve CEC, Bioorganic, control toxic
Nursery and Planting stock
Land-reconstruction and site preparation
• Planting size, seedling quality, compacted and activated root
• Land stabilization, leveling , top soiling, and prevent erosion,
Planting techniques
Maintenance • Re-panting, refertilizer, weeding, Lateral root manipulation
• Timing , root ball position • Planting
Model
Monitoring and Evaluation • Schedule, data collection, reporting, frequency and improvement • Practical-Guideline and SOP
Setiadi.Yadi. 2012
01) Species Selection Complying Regulation • Composition : Shaded trees, Main tress, MPTS, Conservation tress and endanger (protected tress)
Planting Design • To minimize the competition effect • To arrange for beauty performance
Adapted on soil and environmental Conditions • Approved can be survive on certain condition
The planting stocks • The number of species are available • Seedling planting stock available
02) Nursery, Seedling Quality and Transportation Nursery conditions affected on seedling quality : • Light intensity • Temperature , Humidity, and air circulation • Water quality
Seedling quality • Medium composition • Healthy performance • Root ball compaction
Seedling Transportation • Transfer from nursery to field • Seedling placement in the field • Planting operation
Nursery 03) Potential Gully Erosion and Exposed OB
Potential Impact : Exposed OB and Generated AMD Physically destroying plants
Control gully erosion : • Filled up top soil • Establish trenching • Planting LCC
Nursery 04). Soil Compaction and Water Log
Content silt and clay Water permeability Root not well develop Tress performance : Yellowish, stagnant
Solution :
Pre-soil analysis Vertical ripping, LRM (Lateral Root Manipulation) Select adaptive species
05)Top Soiling Problems Top soil thickness <10cm
Soil compacted Eroded • Accelerate gully development • Exposed to compacted clay and toxic materials • Plant performances – – – –
Stagnant Dying Costly for repairing Can not meet standard
Nursery
06) Over Shaded Condition
Effect over shaded : Main tress meranti are dying Condition is not condusive for natural colonization Lack for biodiversity development
Improvement : Improve light condition by teres treaments
5) Better Shading Condition for Shorea
6) Species Selection Complying Regulation • Composition : Shaded trees, Main tress, MPTS, Conservation tress and endanger (protected tress)
Planting Design • To minimize the competition effect • To arrange for beauty performance
Adapted on soil and environmental Conditions • Approved can be survive on certain condition
The planting stocks • The number of species are available • Seedling planting stock available
8) Soil Problems
Soil compaction Water log Low in pH and Soil toxic • (Al and Phyrite)
Lack of soil macro and micro Un-balance nutrients ( Ca and Mg)
9) Planting Operation and Maitenance Seedling transportation • Sources of plant failure • Temporary seedling nurse
Planting operation • Ensure seedling healthy • Step Planting operation – Planting hole – Based fertilizer – Planting – Maintenance
10) Tress Maintenance and Monitoring Maintenance • • • •
Re-planting Weeding Fertilizer Pest-control
Monitoring • Evaluate plant survival • Evaluate plant performance
Thank you !!
PT. Akar Langitbumi Cyber 2 Tower, 18th Floor JL.H.R Rasuna Said Blok x-5 kav 13 Jakarta 12950 Indonesia EMAIL :
[email protected] Phone : +62-2170521925, 08111102302
T Good and Responsible Mine Closure