PLN AREA PLN AREA
PSR PSR PSR PSR PSR PSR
TANGGAL LENGKAP dd tanggal
26 Januari 31 Januari 31 Januari 01 Februari 02 Februari 06 Februari
format tanggal mm yyyy
tgl ke-
2016 26 2016 31 2016 31 2016 01 2016 02 2016 06
bln ke-
Jan Jan Jan Feb Feb Feb
thn
2016 2016 2016 2016 2016 2016
Pier Pier Pier Pier Pier Pier
Nama GI
Nama Rayon
TRIP SWITCHING
Nama Penyulang
GARDU INDUK
RAYON
PMT-RECL/PMCB
PENYULANG
Bangil Bangil Bangil Bangil Bangil Bangil
PMT PMT PMT PMT PMT PMT
Cross Cross Cross Cross Cross Cross
field Field Field Field Field field
Nama Recloser RECLOSER
WAKTU PMT TRIP TGL PMT Trip
26-Jan-16 31-Jan-16 31-Jan-16 1-Feb-16 2-Feb-16 6-Feb-16
WAKTU PMT MASUK
JAM PMT Lepas
TGL PMT Masuk
17:20 12:20 18:56 11:05 13:10 8:44
26-Jan-16 31-Jan-16 31-Jan-16 1-Feb-16 2-Feb-16 6-Feb-16
P
PMT MASUK JAM PMT Masuk
18:04 12:30 20:02 15:54 13:37 9:13
TOTAL masuk total
5:34 13:03 20:43 16:07 14:00 9:13
GANGGUAN Lama Padam
BEBAN SBLM PADAM
LAMA PADAM
( AMPER )
0:44:00 0:04:00 0:15:00 4:49:00 0:27:00 0:29:00
111 28 22 139 154 106
LAPORAN GANGGUAN PENYULANG HARIAN PT. PLN (PERSERO) DISJATIM - AREA PASURUAN TAHUN 2016 ENS
KATEGORI
( Kwh )
KATEGORI
2,396.81 54.96 161.95 19,713.83 2,040.53 1,508.56
Permanen Temporer Permanen Permanen Permanen Permanen
JENIS RELE KERJA RELE KERJA
OCR OCR-INST OCR-INST OCR-INST OCR-INST OCR-INST
fasa
R-T R-T R-T R-T R-T R-T
CUACA cuaca
hujan-angin berangin hujan-angin berangin berangin cerah
N AN
KETERANGAN KETERANGAN
Kubikel atau komponennya rusak. PMT TM terbuka atau Pelebur TM putus karena gangguan kabel. SUTM putus. Pemutus tegangan menengah terbuka,pelebur tegangan menengah putus karena sebab lain. Rele bekerja karena ikutan (sympthetic tripping). Jumper SUTM rusak.
KODE GGN KODE GGN
23 51 44a 41d 56 44b
< PENYEBAB HARUS D
Terdapat Terdapat Terdapat Terdapat Terdapat Terdapat
PT 20 kv cubikel lembah industri daya 555 kva pecah atau rusak phasa S di jl ry rembang industri kabel antar phasa bertabrakan R-T Sehingga phasa T lepas dari pin isolator nempel di ground PT.NE konduktor jatuh phasa S di depanPT. Purba mega GTT. 170 kawasan Pier konduktor blengket phasa RST di depan PT. Gracia kawasan Pier konduktor P Crossfield dan P UTP bersentuhan di Purbamega jamperan IN CO putus phasa RST di depan PT. Dupont kawasan Pier
PLN AREA PLN AREA
PSR PSR PSR PSR
TANGGAL LENGKAP dd tanggal
24 Februari 17 Maret 28 Agustus 21 Desember
tgl ke-
2015 24 2015 17 2015 28 2015 21
format tanggal mm yyyy bln ke-
Feb Mar Agust Des
thn
2015 2015 2015 2015
Pier Pier Pier Pier
Nama GI
Nama Rayon
TRIP SWITCHING
Nama Penyulang
GARDU INDUK
RAYON
PMT-RECL/PMCB
PENYULANG
Bangil Bangil Bangil Bangil
PMT PMT PMT PMT
Cross Cross Cross Cross
field field field field
Nama Recloser RECLOSER
WAKTU PMT TRIP TGL PMT Trip
24-Feb-15 17-Mar-15 28-Aug-15 21-Dec-15
WAKTU PMT MASUK
JAM PMT Lepas
TGL PMT Masuk
15:21 13:25 9:56 14:11
24-Feb-15 17-Mar-15 28-Aug-15 21-Dec-15
PT. P
PMT MASUK JAM PMT Masuk
16:05 13:37 10:05 15:20
TOTAL masuk total
16:31 15:02 10:30 15:25
GANGGUAN Lama Padam
BEBAN SBLM PADAM
LAMA PADAM
( AMPER )
0:00:00 0:20:00 0:24:00 0:07:00
90 107 140 141
LAPORAN GANGGUAN PENYULANG HARIAN PT. PLN (PERSERO) DISJATIM - AREA SURABAYA UTARA TAHUN 2015 ENS
KATEGORI
( Kwh )
KATEGORI
1,050.20 1,648.91 484.37
Temporer Permanen Permanen Permanen
JENIS RELE KERJA RELE KERJA
OCR OCR-INST OCR-INST OCR-INST
fasa
R-T T R-T
CUACA cuaca
hujan-angin cerah cerah hujan
N UTARA
KETERANGAN KETERANGAN
Pemutus tegangan menengah terbuka,pelebur tegangan menengah putus karena sebab lain. Jumper SUTM rusak. Pemutus tegangan menengah terbuka, pelebur tegangan menengah putus karena pohon/dahan. Pemutus tegangan menengah terbuka, pelebur tegangan menengah putus karena pohon/dahan.
KODE GGN KODE GGN
41d 44b 41a 41a
< PENYEBAB HARUS D
Tidak diketemukan Terdapat jumperan TM10 A1 putus phasa T di gudang RPX Ds rembang Terdapat orang dinas pertanahan potong pohon palem jatuh ke jaringan SUTM di Depan PT.SARI ROTI Kawas Terdapat bambu roboh mengenai jaringan di ds bale panjang
0
HARI NIHIL GANGGUAN AREA PASURUAN 2014 =
TANGGAL
18-06-2014 15-08-2014 12-11-2014 29-12-2014
HARI
JURNAL GANGGUAN JAM LEPAS
PMT MASUK
MASUK TOTAL
LAMA PADAM
0:53 10:53 10:08 20:23
1:23 11:01 10:34 20:39
3:37 11:01 10:34 22:02
164 8 16 16
MONITO
N TEMPORER
RELE KERJA
PERMANEN Permanen Permanen Permanen Permanen
DGR DGR OCR DGR
KV - NOL
20 Cross 18 Cross Cross 17 Cross
PENYULANG
Field Field Field field
MONITORING PENYEBAB GANGGUAN PENYULANG PERIODE : 1 JANUARI 2014 S.D 31 Desem
GARDU INDUK
PIER PIER PIER PIER
RAYON
Bangil Bangil Bangil Bangil
CUACA
Hujan Cerah Cerah Angin Kencang
NGGUAN PENYULANG AREA PASURUAN I 2014 S.D 31 Desember 2014
< PENYEBAB
Terdapat Terdapat Terdapat Terdapat
incoming PMCB Isolasinya rusak phasa RS sehingga flash over sampai tembus dengan body pekerja bangunan membawa besi menyangkut ke jaringan SUTM di PT. Katunia Sentosa timu VCB Rusak ( Pecah ) dan CT Pecah pada phasa S rumah CO Pecah phasa RST di PT. Eka Nobe CT dan CB di PT Aksanobel mengalami kerusakan di gardu PLN karena Flash over di kawasan
KODE
503 202 200 503
6 8 11 12