PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT-MANDIRI PERKOTAAN (PNPM-MP) PROYEK PEMBINAAN KAWASAN PERMUKIMAN DI PERKOTAAN (P2KP) DIREKTORAT JENDERAL CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM & PERUMAHAN RAKYAT Nomor & Periode Invoice Realisasi Invoice Nomor Loan Nama Konsultan Alamat Konsultan Paket Pekerjaan Nomor & Tanggal Kontrak Periode Kontrak NO
KOMPOSISI BIAYA
: No. 19 Periode (November 2015) : Desember 2015 : ICDD Phase III : PT. Surya Abadi In Join Venture With PT. Laras sembada : Jl. Banyu Urip No. 217, Surabaya : Consultant Service for Oversight Consultant (OC) Regional Management NAD, Sumut, Sumbar, Riau, Kep.Riau / OC-1 : HK.02.03/OC-1/IDB-ICDD/SATKER-PKP/017/2013 - 07 Maret 2013 : 07 Maret 2013 s/d 31 Desember 2015 AMENDEMENT CONTRACT NO. 7
NVOICE LALU
INVOICE SAAT INI
INVOICE S/D SAAT INI
SISA KONTRAK
I 1.1 1.2
REMUNERATION Professional Staff Supporting Staff
39.659.708.000 33.263.665.000 6.396.043.000
36.858.352.500 30.829.616.000 6.028.736.500
1.029.600.000 846.100.000 183.500.000
37.887.952.500 31.675.716.000 6.212.236.500
1.771.755.500 1.587.949.000 183.806.500
II 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11
DIRECT REIMBURSABLE COST Mobilization/Demobilization Housing Allowance Duty Travel Expenses NAD Duty Travel Expenses Sumatera Utara Duty Travel Expenses Sumatera Barat Duty Travel Expenses Riau Duty Travel Expenses Kep. Riau Office Operational Expenses Office Equipment Expenses Rental Expenses Reporting Expenses
18.464.211.475 99.800.000 570.250.000 191.320.950 1.350.972.200 1.400.536.100 925.971.720 895.429.900 2.835.340.605 1.305.200.000 8.863.490.000 25.900.000
13.404.831.644 24.833.400 497.415.000 70.371.110 252.050.650 287.685.700 213.418.170 212.965.300 2.439.709.314 1.239.438.000 8.155.545.000 11.400.000
375.167.000 11.750.000 2.075.000 1.710.000 25.762.000 333.870.000 -
13.779.998.644 24.833.400 509.165.000 70.371.110 252.050.650 289.760.700 215.128.170 238.727.300 2.439.709.314 1.239.438.000 8.489.415.000 11.400.000
4.684.212.831 74.966.600 61.085.000 120.949.840 1.098.921.550 1.110.775.400 710.843.550 656.702.600 395.631.291 65.762.000 374.075.000 14.500.000
III 3.1 3.2 3.3
TRAINING ACTIVITY EXPENSES Training in Regional Levels Training in Provincial Levels Training in City/Regency Levels
6.734.226.625 80.929.000 4.744.428.325 1.908.869.300
3.434.253.960 65.693.910 2.970.460.255 398.099.795
-
3.434.253.960 65.693.910 2.970.460.255 398.099.795
3.299.972.665 15.235.090 1.773.968.070 1.510.769.505
IV 4.1 4.2
SOCIALIZATION ACTIVITY EXPENSES Socialization Activity in Provincial Levels Socialization Activity in City/Regency Levels
4.909.288.900 786.899.400 4.122.389.500
3.012.457.050 679.933.400 2.332.523.650
-
3.012.457.050 679.933.400 2.332.523.650
1.896.831.850 106.966.000 1.789.865.850
GRAND TOTAL ( I + II + III + IV )
69.767.435.000
56.709.895.154
1.404.767.000
58.114.662.154
11.652.772.846
ADVANCE PAYMENT
4.033.605.500
4.033.605.500
-
4.033.605.500
19.825.000
-
19.825.000
REFUND *) CLAIM THIS PAYMENT
65.733.829.500
52.656.464.654
1.404.767.000
54.061.231.654
(19.825.000) 11.672.597.846
I. REMUNERATION NO.
NAMA
POSISI
AMENDEMENT CONTRACT NO. 7 Vol
I. 1 PROFESSIONAL STAFF I.1.1 A 1 2 3
B B.1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
B.2 1
2 3 4 5 6 7
8 9 10 11 12 13
14
OC LEVEL Program Director Ferry Setyawan, S.Si, M.Si Ferry Setyawan, S.Si, M.Si Muhammad Jumhadi, S.Ag Imam Asfahani, S.Ag Kaharudin M. Usman, SH Awaluddin Siregar
Rate
Jumlah
INVOICE LALU Vol
33.263.665.000
26,5 7,0 15,7 17,8 15,2 17,8
Province Level Propinsi NAD (Banda Aceh) Drs. Benny Supriyadi Arif, SP Abu Hasan As'ari, S.Ag Muhammad Abduh, ST Heriyanto, Spd Mad Enoh, SP Ma'mun Suryana Hendra Asmen, ST Lisa Afianti Tursaman, SE Yadi Sentosa Lena Afrina Ferry Suryawan Nurhasanah Fahriansyah Dwijayanti Tedy Dermawan Hendra Saputra Hamami, S.Sos Syaifulsyah, SE Nur Wahidah, SE, M.sc Sabirin Sahputra Ary Yondra
Provincial Team Leader Monev Specialist a. Sub Spec. for Monev MIS Specialist Socialization Specialist Training Specialist Training Specialist Infrastructure Specialist Infrastructure Specialist Micro Fin & Fin.Mgmt Spec. Micro Fin & Fin.Mgmt Spec. a.1. Sub Proff. Financial (Community Grand) a.2. Sub Proff. Financial (Community Grand) a.3. Sub Proff. Financial (Community Grand) a.4. Sub Proff. Financial (Community Grand) a.5. Sub Proff. Financial (Community Grand) b.1. Sub Proff. Administration (Fix Cost) b.2. Sub Proff. Administration (Fix Cost) Local Gov & Public Policy Spec Local Gov & Public Policy Spec Livelihood & SME's Specialist Urban Planner Specialist Urban Planner Specialist
5,5 9,5 5,5 8,8 9,5 5,5 4,0 5,5 4,0 5,5 4,0 9,5 9,5 9,5 9,5 6,5 9,5 9,5 8,5 9,5 9,5
Propinsi Sumatera Utara (Medan) Estefanus Wolok, ST Drs. Bajang Achmadi Drs. Bajang Achmadi Roby Batubara, ST Roby Batubara, ST Awaluddin Siregar, SH Muliadi Torong Zulkifli Siregar, S.Kom Zulkifli Siregar, S.Kom Raziza Malindawati, SP Taufik Hidayat Nurwino Wajib, ST Nurwino Wajib, ST Dra. Roswaty M.Ed. Rd. Agus Vuttawan Rd. Agus Vuttawan Ir. Syafriadi Ma'aruf Ir. Syafriadi Ma'aruf Zulhan Hadi Lubis, ST Zulhan Hadi Lubis, ST Samuel Abel Tanta S, SE Samuel Abel Tanta S, SE Drs. Armin Lubis Drs. Armin Lubis Dewi Astuti Dewi Astuti Tri Febrianti Handayani Lilis Ernawaty Hutagaol, SE Lilis Ernawaty Hutagaol, SE Supriyadi Supriyadi
Provincial Team Leader Provincial Team Leader Provincial Team Leader Monev Specialist Monev Specialist a. Sub Spec. for Monev a. Sub Spec. for Monev MIS Specialist MIS Specialist Socialization Specialist Socialization Specialist Training Specialist Training Specialist a. Sub Spec. for Training a. Sub Spec. for Training a. Sub Spec. for Training Infrastructure Specialist Infrastructure Specialist a. Sub Spec. for Infrastructure a. Sub Spec. for Infrastructure Micro Fin & Fin.Mgmt Spec. Micro Fin & Fin.Mgmt Spec. a.1. Sub Proff. Financial (Community Grand) a.1. Sub Proff. Financial (Community Grand) a.2. Sub Proff. Financial (Community Grand) a.2. Sub Proff. Financial (Community Grand) a.3. Sub Proff. Financial (Community Grand) a.3. Sub Proff. Financial (Community Grand) a.3. Sub Proff. Financial (Community Grand) a.4. Sub Proff. Financial (Community Grand) a.4. Sub Proff. Financial (Community Grand)
7,5 18,8 7,0 26,5 7,0 15,7 16,5 26,5 7,0 15,7 17,8 26,5 7,0 22,0 7,0 26,5 7,0 26,5 7,0 26,5 7,0 26,5 7,0 26,5 7,0 3,5 14,0 7,0 26,5 7,0
INVOICE SAAT INI Jumlah
Vol
Rate
30.829.616.000
1.596.910.000 Program Director Program Director a. Assisten of PD for Consolidation & Reporting a. Assisten of PD for Consolidation & Reporting b. Assisten of PD for Legal & HCU b. Assisten of PD for Legal & HCU
Rate
31.666.755.000 2.122.690.000
Jumlah
1,0 1,0 796.900.000 -
1.195.000
1,0 1,0 1,0 1,0 1,0 1,0
1,0 1,0 1,0 1,0 1,0
1,0 1,0
Rate
49.200.000
30.128.006.000 2.122.690.000
258.700.000
1.538.749.000 -
9.225.271.000 7,50 18,80 6,00 26,50 6,00 15,72 15,50 26,50 6,00 15,72 16,77 26,50 6,00 22,00 2,65 26,50 6,00 26,50 6,00 26,50 6,00 26,50 6,00 26,50 6,00 3,50 14,00 6,00 26,50 6,00
Jumlah 1.587.949.000
1,00 1,00 1,00
5,50 9,50 5,50 8,82 9,50 5,50 4,00 5,50 4,00 5,50 4,00 9,50 9,50 9,50 9,50 6,50 9,50 9,50 8,50 9,50 9,50 8.966.571.000
SISA KONTRAK Vol
1.547.710.000 26,50 6,00 15,72 16,77 15,22 16,77
5,50 9,50 5,50 8,82 9,50 5,50 4,00 5,50 4,00 5,50 4,00 9,50 9,50 9,50 9,50 6,50 9,50 9,50 8,50 9,50 9,50
7,50 18,80 5,00 26,50 5,00 15,72 14,50 26,50 5,00 15,72 15,77 26,50 5,00 22,00 2,65 26,50 5,00 26,50 5,00 26,50 5,00 26,50 5,00 26,50 5,00 3,50 14,00 5,00 26,50 5,00
Rate
31.675.716.000
49.200.000 1,0
29.331.106.000 2.122.690.000
9.659.730.000
Vol
846.100.000
1.498.510.000 26,50 5,00 15,72 15,77 15,22 15,77
INVOICE S/D SAAT INI
Jumlah
434.459.000 1,00 1,00 1,00 1,00 1,00 1,00 4,35 1,00 1,00 1,00 1,00 1,00 1,00 1,00
Remun // 2 of 50
NO.
NAMA
POSISI
AMENDEMENT CONTRACT NO. 7 Vol
I. 115PROFESSIONAL STAFF Rita Malpinas Saragi 16 17 18 19
20 21 22
23
B.3 1 2 3 4
5 6
7 8 9 10 11
12 13 14
15 16 17 18 19 20 21
Rita Malpinas Saragi Adi Faomasi Buulolo Adi Faomasi Buulolo Nia Tesalonika Nia Tesalonika Rofiqoh Rofiqoh Erwin Yuswardin Lubis Nurhijrah, SE Nurhijrah, SE Eka Oktarina Pohan Eka Oktarina Pohan Susanti, S.Sos., M.Si Muhammad Jumhadi, S.Ag Daniel Collyn Damani, SE, MM Elly Rahayu Elly Rahayu Ary Yondra Juli Ervina, ST Andi Nazriansyah
a.5. Sub Proff. Financial (Community Grand) a.5. Sub Proff. Financial (Community Grand) a.6. Sub Proff. Financial (Community Grand) a.6. Sub Proff. Financial (Community Grand) a.7. Sub Proff. Financial (Community Grand) a.7. Sub Proff. Financial (Community Grand) a.8. Sub Proff. Financial (Community Grand) a.8. Sub Proff. Financial (Community Grand) b.1. Sub Proff. Administration (Fix Cost) b.1. Sub Proff. Administration (Fix Cost) b.1. Sub Proff. Administration (Fix Cost) b.2. Sub Proff. Administration (Fix Cost) b.2. Sub Proff. Administration (Fix Cost) Local Gov & Public Policy Spec Local Gov & Public Policy Spec Livelihood & SME's Specialist Livelihood & SME's Specialist Livelihood & SME's Specialist Urban Planner Specialist**) Urban Planner Specialist**) Urban Planner Specialist**) Urban Planner Specialist**)
26,5 7,0 24,0 7,0 26,5 7,0 26,5 7,0 9,0 17,0 7,0 26,5 7,0 15,7 17,8 25,5 7,0 15,7 16,5
Propinsi Sumatera Barat (Padang) Indro Budiono, S.Psi Afriadi, M.Si Joni Hardi, S.Pt Totok Priyanto, SE Risyanto Rahman, SH Risyanto Rahman, SH H. Zainul Mushoffie, ST M. Ali Firman Tri Wibowo, S.MB Muhammad Abduh Muhammad Abduh Robby Hotter Robby Hotter Zulfadli Muchtar, S.ThI Hendri Matias, S.Sos Zulfadli Muchtar, S.ThI Muslim, ST Muslim, ST Roza Hardeni, SE Roza Hardeni, SE Ferdiansyah Ferdiansyah Rurry Lestarie Rurry Lestarie Yulistia Fatimah Fatimah Arravanco Ascesto Arravanco Ascesto Novriyo Della Akhyar Novriyo Della Akhyar Naomi De Marcia Ibrahim Al Hadid Ibrahim Al Hadid Nuraisyah Nuraisyah Dini Yusron M. Ridwan Maulana M. Ade Fadhillah Assidiq Islah Milono Ir. Afriadi, M.Si Hendri Matias, S.Sos Fauzan, SE Fauzan, SE Lisa Risna, ST
Provincial Team Leader Provincial Team Leader Monev Specialist Monev Specialist a. Sub Spec. for Monev a. Sub Spec. for Monev MIS Specialist MIS Specialist MIS Specialist MIS Specialist Socialization Specialist Socialization Specialist Training Specialist Training Specialist Training Specialist Infrastructure Specialist Infrastructure Specialist Micro Fin & Fin.Mgmt Spec. Micro Fin & Fin.Mgmt Spec. a.1. Sub Proff. Financial (Community Grand) a.1. Sub Proff. Financial (Community Grand) a.2. Sub Proff. Financial (Community Grand) a.2. Sub Proff. Financial (Community Grand) a.3. Sub Proff. Financial (Community Grand) a.3. Sub Proff. Financial (Community Grand) a.3. Sub Proff. Financial (Community Grand) a.4. Sub Proff. Financial (Community Grand) a.4. Sub Proff. Financial (Community Grand) a.5. Sub Proff. Financial (Community Grand) a.5. Sub Proff. Financial (Community Grand) b.1. Sub Proff. Administration (Fix Cost) b.1. Sub Proff. Administration (Fix Cost) b.1. Sub Proff. Administration (Fix Cost) b.2. Sub Proff. Administration (Fix Cost) b.2. Sub Proff. Administration (Fix Cost) c.1. Sub Proff. Keuangan Mikro Syariah c.1. Sub Proff. Keuangan Mikro Syariah c.2. Sub Proff. Keuangan Mikro Syariah c.3. Sub Proff. Keuangan Mikro Syariah c.3. Sub Proff. Keuangan Mikro Syariah Local Gov & Public Policy Spec Local Gov & Public Policy Spec Livelihood & SME's Specialist Livelihood & SME's Specialist Urban Planner Specialist**)
15,7 17,8 15,7 17,8 26,5 7,0 5,0 17,0 7,0 26,5 7,0 9,5 5,6 17,8 26,5 7,0 26,5 7,0 26,5 7,0 26,5 7,0 7,5 14,0 7,0 26,5 7,0 26,5 7,0 1,0 24,0 7,0 26,5 7,0 14,0 14,0 14,0 15,7 17,8 26,5 7,0 26,5
Rate
Jumlah
INVOICE LALU Vol
Rate
INVOICE SAAT INI Jumlah
26,50 5,00 24,00 5,00 26,50 5,00 26,50 5,00 8,98 17,00 5,00 26,50 5,00 15,72 15,27 25,50 2,65 15,72 14,50 8.434.865.000
Vol
Rate
INVOICE S/D SAAT INI Vol
1,0 1,0 1,0
1,0 1,0 -
1,0 255.200.000 1,0 1,0 1,0
1,0 1,0
1,0 1,0 1,0 1,0 1,0
1,0 1,0 1,0
1,0 1,0
1,0 1,0
Rate
Jumlah
26,50 6,00 24,00 6,00 26,50 6,00 26,50 6,00 8,98 17,00 6,00 26,50 6,00 15,72 15,27 25,50 2,65 15,72 15,50
1,0
7.748.415.000 15,72 15,77 15,72 15,77 26,50 5,00 5,00 17,00 5,00 26,50 5,00 9,50 5,57 15,77 26,50 5,00 26,50 5,00 26,50 5,00 26,50 5,00 7,50 14,00 5,00 26,50 5,00 26,50 5,00 1,00 24,00 5,00 26,50 5,00 7,00 7,00 6,00 15,72 15,77 26,50 5,00 26,50
Jumlah
SISA KONTRAK Vol
Jumlah
1,00 1,00 1,00 1,00 1,00 1,00 2,50 4,35 1,00 8.003.615.000
15,72 16,77 15,72 16,77 26,50 6,00 5,00 17,00 6,00 26,50 6,00 9,50 5,57 16,77 26,50 6,00 26,50 6,00 26,50 6,00 26,50 6,00 7,50 14,00 6,00 26,50 6,00 26,50 6,00 1,00 24,00 6,00 26,50 6,00 7,00 7,00 6,00 15,72 16,77 26,50 6,00 26,50
Rate
431.250.000 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 7,00 7,00 8,00 1,00 1,00 -
Remun // 3 of 50
NO.
NAMA
POSISI
AMENDEMENT CONTRACT NO. 7 Vol
I. 1 PROFESSIONAL Lisa Risna, STSTAFF
Urban Planner Specialist**)
7,0
Rate
Jumlah
INVOICE LALU Vol 5,00
Rate
INVOICE SAAT INI Jumlah
Vol 1,0
Rate
Jumlah
INVOICE S/D SAAT INI Vol 6,00
Rate
Jumlah
SISA KONTRAK Vol
Rate
Jumlah
1,00
Remun // 4 of 50
NO.
NAMA
POSISI
AMENDEMENT CONTRACT NO. 7 Vol
Rate
INVOICE LALU
Jumlah
Vol
Rate
INVOICE SAAT INI Jumlah
Vol
Rate
Jumlah
INVOICE S/D SAAT INI Vol
Rate
Jumlah
SISA KONTRAK Vol
Rate
Jumlah
I. 1 PROFESSIONAL STAFF B.4 1
2 3 4 5 6 7 8 9 10 11 12
B.5 1 2 3
4
5 6
7
8
9 10
11 12
Propinsi Riau (Pekanbaru) Totok Priyanto, SE Muhammad Irfan, ST Muhammad Irfan, ST Drs. Sapto Nugroho Drs. Sapto Nugroho Raden Rusdianto, S.Kom Alamsyah Putra Lubis Danu Umbara, SE Danu Umbara, SE Jaja Sumantri, S.Sos Raziza Malindawati Ir. Indra Wijaya Ir. Indra Wijaya Ery Kusmedi Erfan Ashari Nora Diana Nora Diana Mad Saputra Mad Saputra Rusmani Said, SE Rusmani Said, SE Dewi Sofia To Be Name Lola Lolita, ST To Be Name
Provincial Team Leader Provincial Team Leader Provincial Team Leader Monev Specialist Monev Specialist MIS Specialist MIS Specialist Socialization Specialist Socialization Specialist Training Specialist Training Specialist Infrastructure Specialist Infrastructure Specialist Micro Fin & Fin.Mgmt Spec. Micro Fin & Fin.Mgmt Spec. a.1. Sub Proff. Financial (Community Grand) a.1. Sub Proff. Financial (Community Grand) a.2. Sub Proff. Financial (Community Grand) a.2. Sub Proff. Financial (Community Grand) Local Gov & Public Policy Spec Local Gov & Public Policy Spec Livelihood & SME's Specialist Livelihood & SME's Specialist Urban Planner Specialist**) Urban Planner Specialist**)
15,7 10,8 7,0 26,5 7,0 19,5 12,0 26,5 7,0 23,5 9,0 26,5 7,0 15,7 17,8 26,5 7,0 26,5 7,0 26,5 7,0 25,5 7,0 -
Propinsi Kepulauan Riau (Tanjung Pinang) Muhammad Irfan, ST Joni Hardi, S.Pt Danlipasko Timisela, SE Danlipasko Timisela, SE Iskandar Nasution, S.Kom. Bambang Suryono, S.Kom Bambang Suryono, S.Kom Suwisnu Rudi Rosyidi Rudi Rosyidi Imam Asfahani, S.Ag Ramdan Muhammad Ir. Ugraneta Doni Permadi Hendra Asmen Sholihul Hadi, SE Oriency P. Sitinjak, SE Ery Kusmedi, SE Romalisa Romalisa Sri Wahyuni Ali Murdani Dadan Somdani, S.Ag, MM Heru Setyo Budi, SP Heru Setyo Budi, SP M. Kasim Machmud, SE Oriency P. Sitinjak, SE Juli Ervina, ST To Be Name
Provincial Team Leader Provincial Team Leader Monev Specialist Monev Specialist MIS Specialist MIS Specialist MIS Specialist Socialization Specialist Socialization Specialist Socialization Specialist Training Specialist Training Specialist Infrastructure Specialist Infrastructure Specialist Infrastructure Specialist Micro Fin & Fin.Mgmt Spec. Micro Fin & Fin.Mgmt Spec. Micro Fin & Fin.Mgmt Spec. a.1. Sub Proff. Financial (Community Grand) a.1. Sub Proff. Financial (Community Grand) a.1. Sub Proff. Financial (Community Grand) a.2. Sub Proff. Financial (Community Grand) Local Gov & Public Policy Spec Local Gov & Public Policy Spec Local Gov & Public Policy Spec Livelihood & SME's Specialist Livelihood & SME's Specialist Urban Planner Specialist**) Urban Planner Specialist**)
15,7 17,8 26,5 7,0 25,5 7,0 6,5 19,5 7,0 15,7 17,8 13,5 16,5 5,5 9,7 17,8 26,5 7,0 16,0 25,5 7,0 15,2 17,8 -
5.829.155.000
2
3
Program Director Wedia Abdul Halim Wedia Abdul Halim Asneli Lubis Asneli Lubis Lia Syafrida Achmad Syarifudin Hamsyah Fadli
5.620.315.000
I. 2 SUPPORTING STAFF I.2.1 1
17.000.000
5.346.355.000 15,72 10,77 5,00 26,50 5,00 19,50 10,00 26,50 5,00 21,50 7,00 26,50 5,00 15,72 15,77 26,50 5,00 26,50 5,00 26,50 5,00 25,50 -
26,5 7,0 26,5 3,0 4,0 2,5 3,0
0,5 1,0 1,0 1,0 1,0 1,0 1,0 1,0
5.147.075.000
144.200.000
1,0
1,0
1,0
1,0
1,0
1,0 1,0
1,0
5.291.275.000
183.500.000 9.400.000 1,0 1,0
344.000.000 1,00 1,50 1,00 1,00 2,00 1,00 1,00 2,00 1,00 1,00 1,00 7,00 -
15,72 16,77 26,50 6,00 25,50 6,00 6,50 19,50 6,00 15,72 12,25 13,50 15,50 5,50 9,72 16,77 26,50 6,00 15,00 25,50 2,00 15,22 16,77 -
1,0
6.028.736.500 285.500.000 26,50 5,00 26,50 3,00 2,00 2,50 3,00
5.485.155.000 15,72 10,77 6,00 26,50 5,50 19,50 11,00 26,50 6,00 21,50 8,00 26,50 6,00 15,72 15,77 26,50 6,00 26,50 6,00 26,50 6,00 25,50 -
1,0
15,72 15,77 26,50 5,00 25,50 5,00 6,50 19,50 5,00 15,72 12,25 13,50 14,50 5,50 9,72 15,77 26,50 5,00 14,00 25,50 2,00 15,22 15,77 6.396.043.000 304.300.000
Office Manager Office Manager Secretary Secretary Secretary Computer Operator Computer Operator
138.800.000
329.040.000 1,00 1,00 1,00 1,00 5,52 1,00 1,00 1,00 1,00 5,00 1,00 -
6.214.536.500 294.900.000 26,50 6,00 26,50 3,00 3,00 2,50 3,00
189.556.500 9.400.000 1,00 1,00 -
Remun // 5 of 50
NO.
NAMA
POSISI
AMENDEMENT CONTRACT NO. 7 Vol
I. 1 PROFESSIONAL STAFF Erwinsyah Harahap Lia Syafrida Dinda Fakhrunnisa I.2.2 1 2 3
4
5
I.2.3 1 2 3 4 5 6 I.2.4 1
2
3
4
5 6
I.2.5 1 2
3
4
5
Computer Operator Computer Operator Computer Operator
11,0 13,0 4,0
Propinsi Sumatera Utara (Medan) Bebby Mardhani Lisa Novita Ismet Azhar Dwi Zulfauzi Pohan Nikmat Nikmat Amirul Ardh Makmur Makmur Nurhayati Ngadimin Indra Syahputra
Secretary Secretary Computer Operator 1 Computer Operator 1 Computer Operator 2 Computer Operator 2 Computer Operator 2 Office Boy Office Boy Office Boy Security Security
15,7 17,8 26,5 7,0 26,5 2,0 5,0 26,5 2,0 5,0 26,5 7,0
Propinsi NAD (Banda Aceh) Zuraida Aziz, SP Ika Fadilla Rizka Ade Putri Marfah Sari Natalia Khairiandi Syarifuddin To Be Name Nasrullah Syamsudin Hendra
Ass Office Manager Ass Office Manager Secretary Secretary Computer Operator 1 Computer Operator 1 Computer Operator 2 Computer Operator 2 Office Boy Office Boy Security
5,5 4,0 5,5 4,0 5,5 1,0 5,5 5,5 3,0 9,5
Propinsi Sumatera Barat (Padang) Rossa Leonardy Maha P Leonardy Maha P Zufniati, S.Kom Dayla May C, S.Kom Dayla May C, S.Kom Ibrahim Al Hadid Dayla May C, S.Kom Leonardy Maha P Rossa Vani Monita Daslim Leonardy Maha P Maulana Lukman Vani Monita Yeni Wasmal Vebrina Putri Risman Silus Silus Oswandi M. Fadri Anwar Febrian Hidayat Muhammad Khairil
Ass Office Manager Ass Office Manager Ass Office Manager Secretary Secretary Secretary Computer Operator 1 Computer Operator 1 Computer Operator 1 Computer Operator 1 Computer Operator 1 Computer Operator 2 Computer Operator 2 Computer Operator 2 Computer Operator 2 Computer Operator 2 Computer Operator 2 Office Boy Office Boy Security Security Security Security
13,5 13,0 7,0 9,5 17,0 7,0 2,5 7,0 4,0 2,0 18,0 2,5 7,0 1,0 5,0 1,0 17,0 26,5 7,0 7,5 19,0 3,0 4,0
Propinsi Riau (Pekanbaru) Agus Djuniar Marzarina Safri Yunita Safitri Marzarina Safri Indah Nursyiam Marzarina Safri Indah Nursyiam Sunia Anggraini Indah Nursyiam Meliswati Yuliana Pertiwi Yuliana Pertiwi
Ass Office Manager Ass Office Manager Secretary Secretary Secretary Computer Operator 1 Computer Operator 1 Computer Operator 1 Computer Operator 2 Computer Operator 2 Computer Operator 2 Office Boy
26,5 7,0 2,5 24,0 7,0 2,5 24,0 7,0 2,5 24,0 7,0 26,5
Rate
Jumlah
INVOICE LALU Vol
Rate
INVOICE SAAT INI Jumlah
11,00 13,00 2,00 286.830.000
Vol
INVOICE S/D SAAT INI
Jumlah
Vol
269.230.000
8.800.000
1,0
1,0
1,0 1,0
352.325.000
380.375.000
1,0
1,0 1,0
1,0 356.250.000
26,50 5,00 2,50 24,00 5,00 2,50 24,00 5,00 2,50 24,00 5,00 26,50
1,0
1,0
1,0
-
363.925.000
11.750.000 1,0
8.800.000
-
13,50 13,00 6,00 9,50 17,00 6,00 2,50 7,00 4,00 2,00 17,00 2,50 7,00 1,00 5,00 1,00 16,00 26,50 6,00 7,50 17,00 3,00 2,00
1,0
15.400.000 1,00 1,00 1,00 1,00 1,00 2,00 2,00
368.000.000 26,50 6,00 2,50 24,00 6,00 2,50 24,00 6,00 2,50 24,00 6,00 26,50
Jumlah
1,00 1,00 1,00 1,00 1,00 91.625.000
11.600.000
1,0
Rate
1,00
5,50 4,00 5,50 4,00 5,50 1,00 5,50 5,50 3,00 9,50
13,50 13,00 5,00 9,50 17,00 5,00 2,50 7,00 4,00 2,00 16,00 2,50 7,00 1,00 5,00 1,00 15,00 26,50 5,00 7,50 17,00 3,00 1,00
SISA KONTRAK Vol
278.030.000
-
5,50 4,00 5,50 4,00 5,50 1,00 5,50 5,50 3,00 9,50 379.325.000
Jumlah
15,72 16,77 26,50 6,00 26,50 2,00 4,00 26,50 2,00 4,00 26,50 6,00
1,0
91.625.000
Rate
11,00 13,00 3,00
1,0
15,72 15,77 26,50 5,00 26,50 2,00 3,00 26,50 2,00 3,00 26,50 5,00 91.625.000
Rate
12.375.000 1,00 1,00 1,00 1,00 -
Remun // 6 of 50
NO.
NAMA
POSISI
AMENDEMENT CONTRACT NO. 7 Vol
I. 1 PROFESSIONAL STAFF Yurlinawati
Office Boy
7,0
Rate
Jumlah
INVOICE LALU Vol 5,00
Rate
INVOICE SAAT INI Jumlah
Vol 1,0
Rate
Jumlah
INVOICE S/D SAAT INI Vol 6,00
Rate
Jumlah
SISA KONTRAK Vol
Rate
Jumlah
1,00
Remun // 7 of 50
NO.
NAMA
POSISI
AMENDEMENT CONTRACT NO. 7 Vol
I. 1 6 PROFESSIONAL STAFF Rahmad
I.2.6 1 2
3
4 5
6
1.2.7 A. 1
2
3
4
5
Rahmad
Security Security
26,5 7,0
Propinsi Kepulauan Riau (Tanjung Pinang) Claudia Kristianti Hidayati Anugerah Hidayati Anugerah Diza Meyrianda Nadhia Masturina Diza Meyrianda Nadhia Masturina Sri Wahyuni Meilia Safitri Eva Kardina Yuditha Eva Kardina Yuditha Husni Rozikin Surris Muti Surris Muti Ricky Juhendra Ricky Juhendra
Ass Office Manager Ass Office Manager Secretary Secretary Secretary Computer Operator 1 Computer Operator 1 Computer Operator 1 Computer Operator 1 Computer Operator 2 Computer Operator 2 Office Boy Office Boy Office Boy Security Security
21,5 12,0 21,5 2,0 10,0 21,5 2,0 3,0 7,0 26,5 7,0 24,5 2,0 7,0 26,5 7,0
SUPPORT STAFF KORKOT + ASKOT Provinsi Sumatera Utara Korkot 1 (Kota Medan) 1. Titin Handayani Afifah Maya Sari Afifah Maya Sari 2. Maya Putri Kirana Dwi Anggriani Tarigan Dwi Anggriani Tarigan 3. Desi Purnamasari Fransta Wijaya Fransta Wijaya
Rate
Jumlah
INVOICE LALU Vol
Vol
355.375.000
Computer Operator Computer Operator Office Boy Office Boy Office Boy
13,50 13,00 5,00 13,50 13,00 5,00 1,50 25,00 5,00
Korkot 2 (Kota Tebing Tinggi) 1. Dewi Septiana Lestari Dewi Septiana Lestari 2. Muhammad Rizky Sinaga Muhammad Rizky Sinaga 3. Erna Ningsih Erna Ningsih
Secretary Secretary Computer Operator Computer Operator Office Boy Office Boy
26,5 7,0 26,5 7,0 26,5 7,0
26,50 5,00 26,50 5,00 26,50 5,00
Korkot 3 (Kab. Deli Serdang) 1. Atiya Tunnur Yane Mutia Cut Mutia Sari Dewi Purnama Sari 2. Yane Mutia Cut Mutia Sari Vinky Feronika Vinky Feronika 3. Poniem Poniem
Secretary Secretary Secretary Secretary Computer Operator Computer Operator Computer Operator Computer Operator Office Boy Office Boy
1,5 12,0 4,0 16,0 1,5 12,0 13,0 7,0 26,5 7,0
1,50 12,00 4,00 14,00 1,50 12,00 13,00 5,00 26,50 5,00
Korkot 4 (Kota Binjai) 1. Rita Damayanti Rita Damayanti 2. Susi Setianingsih Susi Setianingsih 3. Mayang Sarifani Shahnaz Hafiza R Shahnaz Hafiza R
Secretary Secretary Computer Operator Computer Operator Office Boy Office Boy Office Boy
26,5 7,0 26,5 7,0 13,5 13,0 7,0
26,50 5,00 26,50 5,00 13,50 13,00 5,00
Korkot 5 (Kota Padang Sidempuan) 1. Satila Satila
Secretary Secretary
26,5 7,0
26,50 5,00
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
Jumlah
26,00 6,00 11.450.000
1,0
1,0 1,0
1,0 1,0
SISA KONTRAK Vol
366.825.000
130.500.000 56.300.000
11.450.000
4.451.231.500 1.787.350.000
132.131.500 56.300.000 1,00 1,00 1,00
26,50 6,00 26,50 6,00 26,50 6,00
1,00 1,00 1,00
1,50 12,00 4,00 15,00 1,50 12,00 13,00 6,00 26,50 6,00
1,00 1,00 1,00
1,0
26,50 6,00 26,50 6,00 13,50 13,00 6,00
1,00 1,00 1,00
1,0
26,50 6,00
1,00
1,0
1,0
1,0 1,0 1,0
1,0
1,0 1,0
1,0 1,0
Jumlah
1,00 1,00 1,00 1,00 1,00 1,00
13,50 13,00 6,00 13,50 13,00 6,00 1,50 25,00 6,00
1,0
Rate
0,50 1,00
21,50 11,00 21,50 2,00 9,00 21,50 2,00 3,00 6,00 26,50 6,00 24,50 2,00 6,00 26,50 6,00
1,0
4.318.431.500 1.728.750.000
13,5 13,0 7,0 13,5 13,0 7,0 1,5 25,0 7,0
Rate
1,0
21,50 10,00 21,50 2,00 8,00 21,50 2,00 3,00 5,00 26,50 5,00 24,50 2,00 5,00 26,50 5,00 4.575.313.000 1.835.600.000
Secretary Secretary Computer Operator
INVOICE SAAT INI Jumlah
26,00 5,00 378.275.000
Secretary
Rate
Remun // 8 of 50
NO.
NAMA
POSISI
AMENDEMENT CONTRACT NO. 7 Vol
I. 1 PROFESSIONAL 2. Yusnidar STAFF Sabra Sabra 3. Sahroni Sahroni 6
7
8
9
10
11
12
13
14
Rate
Jumlah
INVOICE LALU Vol
Computer Operator Computer Operator Computer Operator Office Boy Office Boy
8,5 18,0 7,0 26,5 7,0
8,50 18,00 5,00 26,50 5,00
Korkot 6 (Kota Pematang Siantar) 1. Siti Latifah Siti Latifah 2. Sahril Batubara Sahril Batubara 3. Rikijin Sijabat Rikijin Sijabat
Secretary Secretary Computer Operator Computer Operator Office Boy Office Boy
26,5 7,0 26,5 7,0 26,5 7,0
26,50 5,00 26,50 5,00 26,50 5,00
Korkot 7 (Kota Tanjung Balai) 1. Juliani Wirdasari Juliani Wirdasari 2. Dewi Tika Dewi Tika 3. Ricky Yakub Sambas Dedi Rosmanto Dedi Rosmanto
Secretary Secretary Computer Operator Computer Operator Office Boy Office Boy Office Boy
26,5 7,0 26,5 7,0 7,5 19,0 7,0
26,50 5,00 26,50 5,00 7,50 19,00 5,00
Korkot 8 (Kab. Karo) 1. Sulastry Br Ginting Sulastry Br Ginting 2. Supriantho Viator Tarigan Rina Oktaviani br Purba Adelina 3. Ani Ani
Secretary Secretary Computer Operator Computer Operator Computer Operator Office Boy Office Boy
26,5 7,0 8,5 10,0 15,0 26,5 7,0
26,50 5,00 8,50 10,00 13,00 26,50 5,00
Askot 1 (Kab. Simalungun) 1. Adibah Chaerani Pane Sri Andani Era Nurhaini 2. Sri Andani Laura Marpaung Sri Wahyuni
Computer Operator Computer Operator Computer Operator Office Boy Office Boy Office Boy
13,5 5,0 15,0 13,5 5,0 15,0
13,50 5,00 13,00 13,50 5,00 13,00
Askot 2 (Kab. Langkat) 1. Halimatun Sa'diyah Halimatun Sa'diyah 2. Heriani Br Sinaga Heriani Br Sinaga
Computer Operator Computer Operator Office Boy Office Boy
26,5 7,0 26,5 7,0
26,50 5,00 26,50 5,00
Askot 3 (Kota Sibolga) 1. Suryani Suryani 2. Sihol Sihol
Computer Operator Computer Operator Office Boy Office Boy
26,5 7,0 26,5 7,0
26,50 5,00 26,50 5,00
Askot 4 (Kab. Labuhan Batu) 1. Tina Asmiani Harahap Tina Asmiani Harahap 2. Ikram Fauzi Ikram Fauzi
Computer Operator Computer Operator Office Boy Office Boy
26,5 7,0 26,5 7,0
26,50 5,00 26,50 5,00
Askot 5 (Kab. Dairi) 1. Wisti Mawarni Wisti Mawarni Wiwied Eka Putri 2. Iwan Boy Sinamo Iwan Boy Sinamo Juhran Pasi
Computer Operator Computer Operator Computer Operator Office Boy Office Boy Office Boy
26,5 4,0 3,0 26,5 2,0 5,0
26,50 4,00 1,00 26,50 2,00 3,00
Askot 6 (Kab. Asahan) 1. Meirani Situmorang Putri Afriyani NS
Computer Operator Computer Operator
13,5 13,0
13,50 13,00
Rate
INVOICE SAAT INI Jumlah
Vol
1,0 1,0
1,0 1,0 1,0
1,0 1,0
1,0
1,0
1,0 1,0
1,0
1,0
1,0 1,0
1,0 1,0
1,0 1,0
1,0
1,0
Rate
Jumlah
INVOICE S/D SAAT INI Vol
Rate
Jumlah
SISA KONTRAK Vol
Rate
8,50 18,00 6,00 26,50 6,00
1,00 1,00
26,50 6,00 26,50 6,00 26,50 6,00
1,00 1,00 1,00
26,50 6,00 26,50 6,00 7,50 19,00 6,00
1,00 1,00 1,00
26,50 6,00 8,50 10,00 14,00 26,50 6,00
1,00 1,00 1,00
13,50 5,00 14,00 13,50 5,00 14,00
1,00 1,00
26,50 6,00 26,50 6,00
1,00 1,00
26,50 6,00 26,50 6,00
1,00 1,00
26,50 6,00 26,50 6,00
1,00 1,00
26,50 4,00 2,00 26,50 2,00 4,00
1,00 1,00
13,50 13,00
-
Jumlah
Remun // 9 of 50
NO.
NAMA
POSISI
AMENDEMENT CONTRACT NO. 7 Vol
I. 1 PROFESSIONAL STAFF Putri Afriyani NS
Computer Operator
7,0
Rate
Jumlah
INVOICE LALU Vol 5,00
Rate
INVOICE SAAT INI Jumlah
Vol 1,0
Rate
Jumlah
INVOICE S/D SAAT INI Vol 6,00
Rate
Jumlah
SISA KONTRAK Vol
Rate
Jumlah
1,00
Remun // 10 of 50
NO.
NAMA
POSISI
AMENDEMENT CONTRACT NO. 7 Vol
I. 1 PROFESSIONAL 2. Siti Mariam STAFF Putri Afriyani NS Yusri Anggraini Sitorus Yusri Anggraini Sitorus B. 1
2
3
4
5
6
7
8
9
10
11
Office Boy Office Boy Office Boy Office Boy
Rate
Jumlah
1,5 12,0 13,0 7,0
INVOICE LALU Vol
Rate
INVOICE SAAT INI Jumlah
1,50 12,00 13,00 5,00
Vol
Rate
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
Jumlah
1,50 12,00 13,00 6,00
1,0
SISA KONTRAK Vol
Rate
Propinsi NAD Korkot 1 (Kota Banda Aceh) 1. Ade Vidra Puspita Sari Cut Miswari 2. Cut Miswari Nieky Sabatini 3. Yusri Yunus
Secretary Secretary Computer Operator Computer Operator Office Boy
7,5 2,0 7,5 1,0 9,5
7,50 2,00 7,50 1,00 9,50
7,50 2,00 7,50 1,00 9,50
-
Korkot 2 (Kota Langsa) 1. Ria Rosika 2. Arif Dwi Cahyo 3. Sugeng
Secretary Computer Operator Office Boy
9,5 9,5 9,5
9,50 9,50 9,50
9,50 9,50 9,50
-
Korkot 3 (Kab. Pidie) 1. Isna Dewi 2. Khairuddin 3. Abubakar
Secretary Computer Operator Office Boy
9,5 9,5 9,5
9,50 9,50 9,50
9,50 9,50 9,50
-
Secretary
9,5 2,5 2,0 5,0 9,5
9,50 2,50 2,00 5,00 9,50
9,50 2,50 2,00 5,00 9,50
-
Computer Operator Computer Operator Computer Operator Office Boy
8,0 1,0 5,0 2,0 7,0
8,00 1,00 5,00 2,00 7,00
8,00 1,00 5,00 2,00 7,00
-
Korkot 6 (Kota Lhokseumawe) 1. Weny Putri Izzati Tia Surfah 2. Tia Sufrah Andriansyah 3. Andriansyah
Secretary Secretary Computer Operator Computer Operator Office Boy
8,5 1,0 8,5 1,0 8,5
8,50 1,00 8,50 1,00 8,50
8,50 1,00 8,50 1,00 8,50
-
Korkot 7 (Kab. Aceh Barat) 1. Susan Triska Gustania Fajri 2. T. Habil Laksamana Yuni Marliana 3. Indra
Secretary Secretary Computer Operator Computer Operator Office Boy
8,5 1,0 8,5 1,0 9,5
8,50 1,00 8,50 1,00 9,50
8,50 1,00 8,50 1,00 9,50
-
Korkot 8 (Kab. Gayo Lues) 1. 2. 3.
Secretary Computer Operator Office Boy
-
-
-
-
Askot 1 (Kota Sabang) 1. Desi Fadila 2.
Computer Operator Office Boy
9,5 -
9,50 -
9,50 -
-
Askot 2 (Kab. Aceh Tengah) 1. Romy Syafrizal 2. Erwin Syahputra
Computer Operator Office Boy
9,5 5,0
9,50 5,00
9,50 5,00
-
Askot 3 (Kab. Aceh Besar) 1. Maulidar 2.
Computer Operator Office Boy
9,5 -
9,50 -
9,50 -
-
Korkot 4 (Kota Subulussalam) 1. Nevitra Isniarti 2. Maqfiroh Wahidah Meirizal Amin Nuaraini Bancin 3. Susi Solin Korkot 5 (Kab. Aceh Tenggara) 1. Nurbaiti 2. Rosiana Annida Wijaya Yusuf Azhari Basar 3. Deni Darmawan
390.175.000
Computer Operator Computer Operator Computer Operator Office Boy
Secretary
390.175.000
-
Jumlah
1,00 390.175.000
-
Remun // 11 of 50
NO.
NAMA
POSISI
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Jumlah
INVOICE LALU Vol
Rate
INVOICE SAAT INI Jumlah
Vol
Rate
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
Jumlah
SISA KONTRAK Vol
Rate
Jumlah
I. 112PROFESSIONAL Askot 4 (Kab. STAFF Aceh Tamiang)
13
C. 1
2
3
4
5
1. Wahyu Murtika Zikriatul Ulya Ida Yunita 2.
Computer Operator Computer Operator Computer Operator Office Boy
3,5 3,0 3,0 -
3,50 3,00 3,00 -
3,50 3,00 3,00 -
-
Askot 5 (Kab. Aceh Selatan) 1. Asbar Medi 2.
Computer Operator Office Boy
9,5 -
9,50 -
9,50 -
-
Propinsi Sumatera Barat Korkot 1 (Kota Padang) 1. Ryan Trika Sari Yesi Maiyulini 2. Rinaldi Rinaldi 3. Fitriyanti Fitriyanti
Secretary Secretary Computer Operator Computer Operator Office Boy Office Boy
18,5 15,0 26,5 7,0 26,5 7,0
18,50 13,00 26,50 5,00 26,50 5,00
Korkot 2 (Kota Sawahlunto) 1. Sri Wahyuni, SE Yosi Maharani Merry Septia Adhelina Ria Anggrainy 2. Maidina Yunella Putri Deo Hendryan Merry Septia Adhelina Ria Anggrainy Merry Septia Adhelina 3. Mimi Asyuarti Deniswita Deniswita
Secretary Secretary Secretary Secretary Computer Operator Computer Operator Computer Operator Computer Operator Computer Operator Office Boy Office Boy Office Boy
17,5 4,0 8,0 4,0 11,5 5,0 5,0 8,0 4,0 25,5 1,0 7,0
17,50 4,00 8,00 2,00 11,50 5,00 5,00 8,00 2,00 25,50 1,00 5,00
Korkot 3 (Kota Payakumbuh) 1. Yanuar Reviani Septia Fitri Jayanto Septia Fitri Jayanto 2. Dedi Firma Erizal Sandi Erizal Sandi 3. Lusiamitra Lusiamitra
Secretary Secretary Secretary Computer Operator Computer Operator Computer Operator Office Boy Office Boy
9,5 17,0 7,0 0,5 26,0 7,0 26,5 7,0
9,50 17,00 5,00 0,50 26,00 5,00 26,50 5,00
Korkot 4 (Kota Bukittinggi) 1. Dewi Wahyuni, S.Pd Arifah Rahmi Vely Karlina Elvina Atika 2. Maulana Lukman Yopi Ofiza Yopi Ofiza 3. Arifah Rahmi Rahma Liza Dira Sudirman Dira Sudirman
Secretary Secretary Secretary Secretary Computer Operator Computer Operator Computer Operator Office Boy Office Boy Office Boy Office Boy
2,5 19,0 2,0 10,0 9,5 17,0 7,0 2,5 9,0 15,0 7,0
2,50 19,00 2,00 8,00 9,50 17,00 5,00 2,50 9,00 15,00 5,00
Korkot 5 (Kota Pariaman) 1. Adharani Musdalifah Nofriyanti Rizky Anggi Luthfia 2. Trisno Fahrorozi, A.M.d Fitri Handayani Riko Rivaldi 3. Yuini Yuini
Secretary Secretary Secretary Computer Operator Computer Operator Computer Operator Office Boy Office Boy
14,8 15,7 3,0 17,5 12,0 4,0 26,5 7,0
14,83 15,66 1,00 17,50 12,00 2,00 26,50 5,00
1.324.563.000
1.242.131.500
40.400.000
1,0 1,0 1,0
1,0
1,0
1,0
1,0
1,0 1,0
1,0
1,0
1,0
1,0
1,0 1,0
1.282.531.500
42.031.500
18,50 14,00 26,50 6,00 26,50 6,00
1,00 1,00 1,00
17,50 4,00 8,00 3,00 11,50 5,00 5,00 8,00 3,00 25,50 1,00 6,00
1,00 1,00 1,00
9,50 17,00 6,00 0,50 26,00 6,00 26,50 6,00
1,00 1,00 1,00
2,50 19,00 2,00 9,00 9,50 17,00 6,00 2,50 9,00 15,00 6,00
1,00 1,00 1,00
14,83 15,66 2,00 17,50 12,00 3,00 26,50 6,00
0,99 1,00 1,00
Remun // 12 of 50
NO.
NAMA
POSISI
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Jumlah
INVOICE LALU Vol
Rate
INVOICE SAAT INI Jumlah
Vol
Rate
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
Jumlah
SISA KONTRAK Vol
Rate
Jumlah
I. 1 6 PROFESSIONAL Askot 1 (KotaSTAFF Solok)
7
8
9
10
11
12
D. 1
2
1. Vilka Elfia Nasrul, SE Yofanda Tessa Githa Prima Zoni Gelsy Dian Tanafa 2. Syahril Syahril
Computer Operator Computer Operator Computer Operator Computer Operator Office Boy Office Boy
3,5 13,0 6,0 11,0 22,5 7,0
3,50 13,00 6,00 9,00 21,00 5,00
Askot 2 (Kab. Sijunjung) 1. Supriadi Indrianti Indrianti Verawati, SP 2. Budi Pamel Budi Pamel
Computer Operator Computer Operator Computer Operator Computer Operator Office Boy Office Boy
6,5 20,0 2,0 5,0 26,5 7,0
6,50 20,00 2,00 3,00 26,50 5,00
Askot 3 (Kab. Lima Puluh Kota) 1. Nurhaida Fitriani Welya Fitri Intan Yulia Rekha 2. Jasminar
Computer Operator Computer Operator Computer Operator Computer Operator Office Boy
4,5 9,0 4,0 16,0 -
4,50 9,00 4,00 14,00 -
Askot 4 (Kab. Agam) 1. Rasyid Rizki Saputra Rasyid Rizki Saputra 2. Muhammad Zikri Muhammad Zikri
Computer Operator Computer Operator Office Boy Office Boy
26,5 7,0 26,0 7,0
26,50 5,00 26,00 5,00
Askot 5 (Kota Padang Panjang) 1. Sasmita Sari Sasmita Sari 2. Aryani Robbi SF Robbi SF
Computer Operator Computer Operator Office Boy Office Boy Office Boy
26,5 7,0 13,5 13,0 7,0
26,50 5,00 13,50 13,00 5,00
Askot 6 (Kab. Padang Pariaman) 1. Nola Elpedriana Nola Elpedriana 2. Indra AP Indra AP
Computer Operator Computer Operator Office Boy Office Boy
26,5 7,0 26,5 7,0
26,50 5,00 26,50 5,00
Askot 7 (Kab. Pesisir Selatan) 1. 2.
Computer Operator Office Boy
-
-
Propinsi Riau Korkot 1 (Kota Pekanbaru) 1. Samiasih Lestari Leni Suryana Leni Suryana 2. Hasrida Murtysol Nurhayati Khasanah Inah Meitasari Fhani Dwinta Sari Muharani Octavianda 3. Alan Kaslan Alan Kaslan
Secretary Secretary Secretary Computer Operator Computer Operator Computer Operator Computer Operator Computer Operator Computer Operator Office Boy Office Boy
25,5 1,0 7,0 4,5 9,0 6,0 6,0 2,0 6,0 26,5 7,0
25,50 1,00 5,00 4,50 9,00 6,00 6,00 2,00 4,00 26,50 5,00
Korkot 2 (Kota Dumai) 1. Putri Febriyani Putri Febriyani 2. Hariadi. H Rosmidah Rosmidah 3. Surbayani Juman
Secretary Secretary Computer Operator Computer Operator Computer Operator Office Boy Office Boy
26,5 7,0 9,5 17,0 7,0 18,5 15,0
26,50 5,00 9,50 17,00 5,00 18,50 13,00
516.325.000
1,0 1,0
1,0 1,0
1,0
1,0 1,0
1,0
1,0
1,0 1,0
479.725.000
3,50 13,00 6,00 10,00 21,00 6,00
1,00 1,50 1,00
6,50 20,00 2,00 4,00 26,50 6,00
1,00 1,00
4,50 9,00 4,00 15,00 -
1,00 -
26,50 6,00 26,00 6,00
1,00 1,00
26,50 6,00 13,50 13,00 6,00
1,00 1,00
26,50 6,00 26,50 6,00
1,00 1,00
-
-
18.300.000
1,0
1,0 1,0
1,0
1,0 1,0
498.025.000
18.300.000
25,50 1,00 6,00 4,50 9,00 6,00 6,00 2,00 5,00 26,50 6,00
1,00 1,00 1,00
26,50 6,00 9,50 17,00 6,00 18,50 14,00
1,00 1,00 1,00
Remun // 13 of 50
NO.
NAMA
POSISI
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Jumlah
INVOICE LALU Vol
Rate
INVOICE SAAT INI Jumlah
Vol
Rate
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
Jumlah
SISA KONTRAK Vol
Rate
Jumlah
I. 1 PROFESSIONAL STAFF 3
4
5
E. 1
2
3
4
Askot 1 (Kab. Kuantan Singingi) 1. Ety Susanti Nopa Betri Irawati Eni Nandia 2. Pegi Aprita Soni
Computer Operator Computer Operator Computer Operator Office Boy
10,5 16,0 7,0 7,0
10,50 16,00 5,00 5,00
Askot 2 (Kab. Bengkalis) 1. Yayan Diana Eva Revania Eva Revania 2. Zainuri Yurike Khrisna Febrinda
Computer Operator Computer Operator Computer Operator Office Boy Office Boy
10,5 16,0 7,0 4,0 3,0
10,50 16,00 5,00 4,00 1,00
Askot 3 (Kab. Indragiri Hilir) 1. Ani Jatmiatin Ani Jatmiatin Raja Anwar Sadat 2. Raja Anwar Sadat Salmawati
Computer Operator Computer Operator Computer Operator Office Boy Office Boy
26,5 4,0 3,0 4,0 3,0
26,50 4,00 1,00 4,00 1,00
Propinsi Kepulauan Riau Korkot 1 (Kota Batam) 1. Indah Sri Rezeky Miwirza Nindya Ananta Endi Selvi 2. Dian Indah Silvia Ratih Indriani Andi Selvi Rizki Kurnia Bahri 3. Totok Santoso Eny Anggraeni Eny Anggraeni
Secretary Secretary Secretary Computer Operator Computer Operator Computer Operator Computer Operator Office Boy Office Boy Office Boy
5,5 9,0 19,0 4,5 7,0 3,0 19,0 7,5 19,0 7,0
5,50 9,00 17,00 4,50 7,00 3,00 17,00 7,50 19,00 5,00
Korkot 2 (Kab. Karimun) 1. Shinta Fitriyani Shinta Fitriyani 2. Sabena Sabena 3. Rafli Rafli
Secretary Secretary Computer Operator Computer Operator Office Boy Office Boy
26,5 7,0 26,5 7,0 26,5 7,0
26,50 5,00 26,50 5,00 26,50 5,00
Askot 1 (Kota Tanjung Pinang) 1. Lalu Irwan Syuriani 2. Bulkaini Muhammad Riko
Computer Operator Computer Operator Office Boy Office Boy
26,5 7,0 26,5 7,0
26,50 5,00 26,50 5,00
Askot 2 (Kab. Bintan) 1. Hengki Priadi Refka Pri Valta Refka Pri Valta 2. Winarto Mardya S
Computer Operator Computer Operator Computer Operator Office Boy Office Boy
25,5 1,0 7,0 26,5 7,0
25,50 1,00 5,00 26,50 5,00
508.650.000
TOTAL REMUNERATION
39.659.708.000
1,0 1,0
10,50 16,00 6,00 6,00
1,00 1,00
1,0 1,0
10,50 16,00 6,00 4,00 2,00
1,00 1,00
26,50 4,00 2,00 4,00 2,00
1,00 1,00
1,0 1,0 477.650.000
15.500.000
1,0
1,0
1,0
1,0 1,0 1,0
1,0 1,0
1,0 1,0 36.858.352.500
1.029.600.000
493.150.000
15.500.000
5,50 9,00 18,00 4,50 7,00 3,00 18,00 7,50 19,00 6,00
1,00 1,00 1,00
26,50 6,00 26,50 6,00 26,50 6,00
1,00 1,00 1,00
26,50 6,00 26,50 6,00
1,00 1,00
25,50 1,00 6,00 26,50 6,00
1,00 1,00 37.890.252.500
1.777.505.500
Remun // 14 of 50
II DIRECT REEIMBURSABLE COST 2.1. MOBILIZATION / DEMOBILIZATION NO
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
2.1
Rate
Jumlah
INVOICE LALU Vol
Rate
INVOICE SAAT INI
Jumlah
Vol
Rate
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
Jumlah
SISA KONTRAK Vol
Rate
Jumlah
Mobilization / Demobilization
1
Original Place - Medan
Trip
11
1.800.000
19.800.000
3
1.800.000
3.022.000
1.800.000
-
3
1.800.000
3.022.000
8
1.800.000
16.778.000
2
Original Place - Banda Aceh
Trip
10
2.500.000
25.000.000
6
2.500.000
6.781.400
2.500.000
-
6
2.500.000
6.781.400
4
2.500.000
18.218.600
3
Original Place - Padang
Trip
10
1.800.000
18.000.000
3
1.800.000
3.440.000
1.800.000
-
3
1.800.000
3.440.000
7
1.800.000
14.560.000
4
Original Place - Pekanbaru
Trip
10
1.800.000
18.000.000
8
1.800.000
6.405.100
1.800.000
-
8
1.800.000
6.405.100
2
1.800.000
11.594.900
5
Original Place - Tj. Pinang/Batam
Trip
10
1.900.000
19.000.000
5
1.900.000
5.184.900
1.900.000
-
5
1.900.000
5.184.900
5
1.900.000
13.815.100
TOTAL
99.800.000
24.833.400
-
24.833.400
74.966.600
II.1 // 15 of 50
II DIRECT REEIMBURSABLE COST 2.2. HOUSING ALLOWANCE NO.
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7
INVOICE LALU
INVOICE SAAT INI
Vol
Rate
Jumlah
Vol
Rate
Jumlah
mth
33,5
500.000
16.750.000
31,50
500.000
15.750.000
1,0
500.000
Province Level (North Sumatera) Provincial Team Leader Monev Specialist MIS Specialist Socialization Specialist Training Specialist Infrastructure Specialist Micro Fin & Fin.Mgmt Spec. Local Gov & Public Policy Spec Livelihood & SME's Specialist Urban Planner Specialist**)
mth mth mth mth mth mth mth mth mth mth
33,5 33,5 7,0 33,5 33,5 7,0 3,0 18,0 31,5 32,5
500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000
16.750.000 16.750.000 3.500.000 16.750.000 16.750.000 3.500.000 1.500.000 9.000.000 15.750.000 16.250.000
31,50 31,50 31,45 31,50 15,25 27,10 30,20
500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000
15.750.000 15.750.000 15.725.000 15.750.000 7.625.000 13.550.000 15.100.000
1,0 1,0
1 2 3 4 5 6 7 8 9 10
Province Level (NAD) Provincial Team Leader Monev Specialist MIS Specialist Socialization Specialist Training Specialist Infrastructure Specialist Micro Fin & Fin.Mgmt Spec. Local Gov & Public Policy Spec Livelihood & SME's Specialist Urban Planner Specialist**)
mth mth mth mth mth mth mth mth mth mth
5,5 9,5 9,0 9,5 9,5 9,5 9,5 8,5 9,5 9,5
500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000
2.750.000 4.750.000 4.500.000 4.750.000 4.750.000 4.750.000 4.750.000 4.250.000 4.750.000 4.750.000
5,50 9,50 9,00 9,50 9,50 9,50 9,50 8,50 9,50 9,50
500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000
2.750.000 4.750.000 4.500.000 4.750.000 4.750.000 4.750.000 4.750.000 4.250.000 4.750.000 4.750.000
1 2 3 4 5 6 7 8 9 10
Province Level (West Sumatera) Provincial Team Leader Monev Specialist MIS Specialist Socialization Specialist Training Specialist Infrastructure Specialist Micro Fin & Fin.Mgmt Spec. Local Gov & Public Policy Spec Livelihood & SME's Specialist Urban Planner Specialist**)
mth mth mth mth mth mth mth mth mth mth
23,0 33,5 25,0 7,0 18,0 7,0 33,5 18,0 33,5 7,0
500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000
11.500.000 16.750.000 12.500.000 3.500.000 9.000.000 3.500.000 16.750.000 9.000.000 16.750.000 3.500.000
15,70 31,45 22,50 5,70 31,50 15,75 31,50 -
500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000
7.850.000 15.725.000 11.250.000 2.850.000 15.750.000 7.875.000 15.750.000 -
1 2 3 4
Province Level (Riau) Provincial Team Leader Monev Specialist MIS Specialist Socialization Specialist
mth mth mth mth
33,5 33,5 33,5 33,5
500.000 500.000 500.000 500.000
16.750.000 16.750.000 16.750.000 16.750.000
31,45 31,50 31,50 31,50
500.000 500.000 500.000 500.000
15.725.000 15.750.000 15.750.000 15.750.000
2.2 1
Housing Allowance OC Level Program Director
1 2 3 4 5 6 7 8 9 10
Vol
1,0 1,0
1,0
1,0 1,0
1,0 1,0 1,0
1,0 0,5 1,0 1,0
Rate
INVOICE S/D SAAT INI
Jumlah
SISA KONTRAK
Vol
Rate
Jumlah
Vol
Rate
Jumlah
500.000
32,50
500.000
16.250.000
1,00
500.000
500.000
500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000
500.000 500.000 500.000 500.000 500.000
32,50 32,50 32,45 32,50 15,25 27,10 31,20
500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000
16.250.000 16.250.000 16.225.000 16.250.000 7.625.000 13.550.000 15.600.000
1,00 1,00 7,00 1,05 1,00 7,00 3,00 2,75 4,40 1,30
500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000
500.000 500.000 3.500.000 525.000 500.000 3.500.000 1.500.000 1.375.000 2.200.000 650.000
500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000
-
5,50 9,50 9,00 9,50 9,50 9,50 9,50 8,50 9,50 9,50
500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000
2.750.000 4.750.000 4.500.000 4.750.000 4.750.000 4.750.000 4.750.000 4.250.000 4.750.000 4.750.000
-
500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000
-
500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000
500.000 500.000 500.000 500.000 500.000 -
15,70 32,45 23,50 5,70 32,50 16,75 32,50 -
500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000
7.850.000 16.225.000 11.750.000 2.850.000 16.250.000 8.375.000 16.250.000 -
7,30 1,05 1,50 7,00 12,30 7,00 1,00 1,25 1,00 7,00
500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000
3.650.000 525.000 750.000 3.500.000 6.150.000 3.500.000 500.000 625.000 500.000 3.500.000
500.000 500.000 500.000 500.000
500.000 250.000 500.000 500.000
32,45 32,00 32,50 32,50
500.000 500.000 500.000 500.000
16.225.000 16.000.000 16.250.000 16.250.000
1,05 1,50 1,00 1,00
500.000 500.000 500.000 500.000
525.000 750.000 500.000 500.000
II.2 // 16 of 50
NO.
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7
INVOICE LALU
INVOICE SAAT INI
Vol
Rate
Jumlah
Vol
Rate
Jumlah
Vol
Rate
Jumlah
Training Specialist Infrastructure Specialist Micro Fin & Fin.Mgmt Spec. Local Gov & Public Policy Spec Livelihood & SME's Specialist Urban Planner Specialist**)
mth mth mth mth mth mth
33,5 33,5 33,5 33,5 33,5 -
500.000 500.000 500.000 500.000 500.000 500.000
16.750.000 16.750.000 16.750.000 16.750.000 16.750.000 -
30,50 31,50 31,45 31,50 25,50 -
500.000 500.000 500.000 500.000 500.000 500.000
15.250.000 15.750.000 15.725.000 15.750.000 12.750.000 -
1,0 1,0 1,0
500.000 500.000 500.000 500.000 500.000 500.000
500.000 500.000 500.000 -
31,50 32,50 31,45 32,50 25,50 -
500.000 500.000 500.000 500.000 500.000 500.000
15.750.000 16.250.000 15.725.000 16.250.000 12.750.000 -
2,00 1,00 2,05 1,00 8,00 -
500.000 500.000 500.000 500.000 500.000 500.000
1.000.000 500.000 1.025.000 500.000 4.000.000 -
1 2 3 4 5 6 7 8 9 10
Province Level (Kep. Riau) Provincial Team Leader Monev Specialist MIS Specialist Socialization Specialist Training Specialist Infrastructure Specialist Micro Fin & Fin.Mgmt Spec. Local Gov & Public Policy Spec Livelihood & SME's Specialist Urban Planner Specialist**)
mth mth mth mth mth mth mth mth mth mth
33,5 33,5 32,5 33,5 33,5 30,5 23,5 32,5 24,5 -
500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000
16.750.000 16.750.000 16.250.000 16.750.000 16.750.000 15.250.000 11.750.000 16.250.000 12.250.000 -
31,45 31,50 30,50 31,00 27,93 28,00 21,25 27,50 15,70 -
500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000
15.725.000 15.750.000 15.250.000 15.500.000 13.965.000 14.000.000 10.625.000 13.750.000 7.850.000 -
1,0 1,0 1,0 1,0
500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000
500.000 500.000 500.000 500.000 500.000 500.000 -
32,45 32,50 31,50 32,00 27,93 29,00 22,25 27,50 15,70 -
500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000
16.225.000 16.250.000 15.750.000 16.000.000 13.965.000 14.500.000 11.125.000 13.750.000 7.850.000 -
1,05 1,00 1,00 1,50 5,57 1,50 1,25 5,00 8,80 -
500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000 500.000
525.000 500.000 500.000 750.000 2.785.000 750.000 625.000 2.500.000 4.400.000 -
570.250.000
497.415.000
1,0 1,0
Rate
Jumlah
SISA KONTRAK
5 6 7 8 9 10
TOTAL
Vol
INVOICE S/D SAAT INI
11.750.000
509.165.000
Vol
Rate
Jumlah
61.085.000
II.2 // 17 of 50
II DIRECT REEIMBURSABLE COST 2.3. DUTY TRAVEL EXPENSES PROVINCE NAD AMENDEMENT CONTRACT NO. 7 NO
URAIAN
Vol
Rate
2.1.1. IN PROVINCE 2.1.1.1 FOR SPOTCHECK PROVINCE TO KELURAHAN (3 % x Number of Kelurahan) a
b
c
d
e
f
g
h
From Banda Aceh to Sabang (18 kel x 3% = 2 kel) Sea Transport trip Tranport trip Acomodation m/d Lumpsum m/d From Banda Aceh to Aceh Besar (12 kel x 3% = 2 kel) Tranport trip Acomodation m/d Lumpsum m/d From Banda Aceh to Aceh Barat (20 kel x 3% = 3 kel) Tranport trip Acomodation m/d Lumpsum m/d From Banda Aceh to Pidie & Lhokseumawe (83 kel x 3% = 10 kel) Tranport trip Acomodation m/d Lumpsum m/d From Banda Aceh to Aceh Tengah, Aceh Tenggara & Gayo Lues (74 kel x 3% = 9 kel) Tranport trip Acomodation m/d Lumpsum m/d From Banda Aceh to Aceh Selatan & Subulussalam (88 kel x 3% = 9 kel) Tranport trip Acomodation m/d Lumpsum m/d From Banda Aceh to Langsa & Aceh Tamiang (56 kel x 3% = 7 kel) Tranport trip Acomodation m/d Lumpsum m/d From Banda Aceh to Banda Aceh (89 kel x 3% = 10 kel) Lumpsum m/d
B. For Ass. City Coordinator Infrastructure and FM in the city ((440 Kel - 65 Kel luar kota) x 50%) x 14 Cost / Day Rp. 50.000.- 1 Day cover 2 kel
1
2
3
4 5
C. For City Coordinator Infrastructure and FM out of te town From Banda Aceh to Sabang Sea Transport Transport From Banda Aceh to Aceh Besar From Pidie to Aceh Besar Transport From Subulussalam to Aceh Selatan From Aceh Barat to Aceh Selatan Transport From Aceh Tenggara to Aceh Tengah Transport From Langsa to Aceh Tamiang Transport
Jumlah
Vol
Rate
4.500.000
INVOICE SAAT INI Jumlah
Vol
Rate
INVOICE S/D SAAT INI
-
Jumlah
Vol
Rate
SISA KONTRAK
-
Jumlah
Vol
Rate
-
Jumlah 4.500.000
1 1 1
300.000 100.000 300.000 50.000
300.000 100.000 50.000
-
300.000 100.000 300.000 50.000
-
300.000 100.000 300.000 50.000
-
-
300.000 100.000 300.000 50.000
-
1 1 1
300.000 100.000 300.000 50.000
300.000 100.000 50.000
1 1
100.000 300.000 50.000
100.000 50.000
-
100.000 300.000 50.000
-
100.000 300.000 50.000
-
-
100.000 300.000 50.000
-
1 1
100.000 300.000 50.000
100.000 50.000
1 1 2
300.000 300.000 50.000
300.000 300.000 100.000
-
300.000 300.000 50.000
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
1 1 2
300.000 300.000 50.000
300.000 300.000 100.000
1 1 2
200.000 300.000 50.000
200.000 300.000 100.000
-
200.000 300.000 50.000
-
200.000 300.000 50.000
-
-
200.000 300.000 50.000
-
1 1 2
200.000 300.000 50.000
200.000 300.000 100.000
1 1 2
600.000 300.000 50.000
600.000 300.000 100.000
-
600.000 300.000 50.000
-
600.000 300.000 50.000
-
-
600.000 300.000 50.000
-
1 1 2
600.000 300.000 50.000
600.000 300.000 100.000
1 1 2
400.000 300.000 50.000
400.000 300.000 100.000
-
400.000 300.000 50.000
-
400.000 300.000 50.000
-
-
400.000 300.000 50.000
-
1 1 2
400.000 300.000 50.000
400.000 300.000 100.000
1 1 2
300.000 300.000 50.000
300.000 300.000 100.000
-
300.000 300.000 50.000
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
1 1 2
300.000 300.000 50.000
300.000 300.000 100.000
2
50.000
100.000
-
50.000
-
50.000
-
-
50.000
-
2
50.000
100.000
2.1.1.2 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM A. For City Coordinator and Assistance City Coordinator (440 Kel x 50%) x 4 Cost / Day Rp. 50.000.- 1 Day cover 2 kel
INVOICE LALU
UNIT
5.300.000
-
-
-
5.300.000
trip
24
50.000
1.200.000
-
50.000
-
50.000
-
-
50.000
-
24
50.000
1.200.000
trip
18
50.000
900.000
-
50.000
-
50.000
-
-
50.000
-
18
50.000
900.000
trip trip
2 2
300.000 100.000
600.000 200.000
-
300.000 100.000
-
300.000 100.000
-
-
300.000 100.000
-
2 2
300.000 100.000
600.000 200.000
trip
2
200.000
400.000
-
200.000
-
200.000
-
-
200.000
-
2
200.000
400.000
trip
2
300.000
600.000
-
300.000
-
300.000
-
-
300.000
-
2
300.000
600.000
trip
2
300.000
600.000
-
300.000
-
300.000
-
-
300.000
-
2
300.000
600.000
trip
4
200.000
800.000
-
200.000
-
200.000
-
-
200.000
-
4
200.000
800.000 II.3 // 18 of 50
AMENDEMENT CONTRACT NO. 7 NO
URAIAN
Vol 2.1.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL a From Banda Aceh to Sabang Sea Transport Tranport Lumpsum b From Banda Aceh to Aceh Besar From Pidie to Aceh Besar Tranport Lumpsum c From Subulussalam to Aceh Selatan From Aceh Barat to Aceh Selatan Tranport Lumpsum d From Aceh Tenggara to Aceh Tengah Tranport Lumpsum e From Langsa to Aceh Tamiang Tranport Lumpsum 2.1.1.4 FROM KAB/KOTA TO TL OFFICE FOR COORDIANTION MEETING a From Sabang to Banda Aceh Sea Transport Tranport Acomodation OSA b From Aceh Besar to Banda Aceh Tranport Acomodation OSA c From Aceh Barat to Banda Aceh Tranport Acomodation OSA d From Pidie & Lhokseumawe to Banda Aceh Tranport Acomodation OSA e From Aceh Tengah, Aceh Tenggara & Gayo Lues to Banda Aceh From Aceh Tengah, Aceh Tenggara to Banda Aceh Tranport Acomodation OSA f From Aceh Selatan & Subulussalam to Banda Aceh Tranport Acomodation OSA g From Langsa & Aceh Tamiang to Banda Aceh Tranport Acomodation OSA
Rate
Jumlah
Vol
Rate
-
INVOICE SAAT INI Jumlah
Vol
Rate
INVOICE S/D SAAT INI
-
Jumlah
Vol
Rate
SISA KONTRAK
-
Jumlah
Vol
Rate
-
Jumlah -
trip trip trip
-
300.000 100.000 50.000
-
-
300.000 100.000 50.000
-
300.000 100.000 50.000
-
-
300.000 100.000 50.000
-
-
300.000 100.000 50.000
-
trip trip
-
200.000 50.000
-
-
200.000 50.000
-
200.000 50.000
-
-
200.000 50.000
-
-
200.000 50.000
-
trip trip
-
300.000 50.000
-
-
300.000 50.000
-
300.000 50.000
-
-
300.000 50.000
-
-
300.000 50.000
-
trip trip
-
300.000 50.000
-
-
300.000 50.000
-
300.000 50.000
-
-
300.000 50.000
-
-
300.000 50.000
-
trip trip
-
200.000 50.000
-
-
200.000 50.000
-
200.000 50.000
-
-
200.000 50.000
-
-
200.000 50.000
-
55.200.000
29.400.510
trip trip m/d m/d
6 6 6 12
300.000 100.000 300.000 50.000
1.800.000 600.000 1.800.000 600.000
2 3 6
trip m/d m/d
6 6 12
100.000 300.000 50.000
600.000 1.800.000 600.000
-
trip m/d m/d
6 6 12
300.000 300.000 50.000
1.800.000 1.800.000 600.000
6 4 12
trip m/d m/d
12 12 24
200.000 300.000 50.000
2.400.000 3.600.000 1.200.000
8 12 20
trip m/d m/d
18 18 36
600.000 300.000 50.000
10.800.000 5.400.000 1.800.000
8 12 20
trip m/d m/d
12 12 24
400.000 300.000 50.000
4.800.000 3.600.000 1.200.000
8 12 20
trip m/d m/d
12 12 24
300.000 300.000 50.000
3.600.000 3.600.000 1.200.000
6 10 16
2.1.1.5 FROM PROVINCE TO REGIONAL FOR WORKSHOP & COORDINATION MEETING AT OC Workshop OC / Coordination Meeting at OC From Banda Aceh to Medan Air Transport OSA [ Fixed ] Local Transport Accomodation
INVOICE LALU
UNIT
Trip Man/D ays Trip Man/D ays
3 6 3 3
300.000 100.000 300.000 50.000 100.000 300.000 50.000 300.000 300.000 50.000 200.000 300.000 50.000 600.000 300.000 50.000 400.000 300.000 50.000 300.000 300.000 50.000
6.300.000
1.500.000 100.000 100.000 300.000
4.500.000 600.000 300.000 900.000
-
1.500.000 100.000 100.000 300.000
25.799.490
320.500 900.000 300.000
300.000 100.000 300.000 50.000
-
2 3 6
300.000 100.000 300.000 50.000
320.500 900.000 300.000
4 6 3 6
300.000 100.000 300.000 50.000
1.479.500 600.000 900.000 300.000
-
100.000 300.000 50.000
-
-
100.000 300.000 50.000
-
6 6 12
100.000 300.000 50.000
600.000 1.800.000 600.000
1.100.010 1.200.000 600.000
300.000 300.000 50.000
-
6 4 12
300.000 300.000 50.000
1.100.010 1.200.000 600.000
2 -
300.000 300.000 50.000
699.990 600.000 -
1.495.000 3.600.000 1.000.000
200.000 300.000 50.000
-
8 12 20
200.000 300.000 50.000
1.495.000 3.600.000 1.000.000
4 4
200.000 300.000 50.000
905.000 200.000
3.350.000 3.000.000 1.000.000
600.000 300.000 50.000
-
8 12 20
600.000 300.000 50.000
3.350.000 3.000.000 1.000.000
10 6 16
600.000 300.000 50.000
7.450.000 2.400.000 800.000
2.760.000 3.000.000 1.000.000
400.000 300.000 50.000
-
8 12 20
400.000 300.000 50.000
2.760.000 3.000.000 1.000.000
4 4
400.000 300.000 50.000
2.040.000 600.000 200.000
1.575.000 2.400.000 800.000
300.000 300.000 50.000
-
6 10 16
300.000 300.000 50.000
1.575.000 2.400.000 800.000
6 2 8
300.000 300.000 50.000
2.025.000 1.200.000 400.000
1.519.000
2 6 1 -
29.400.510
859.000 600.000 60.000 -
-
1.500.000 100.000 100.000 300.000
-
1.519.000
2 6 1 -
1.500.000 100.000 100.000 300.000
859.000 600.000 60.000 -
4.781.000
1 2 3
1.500.000 100.000 100.000 300.000
3.641.000 240.000 900.000 II.3 // 19 of 50
AMENDEMENT CONTRACT NO. 7 NO
URAIAN
Vol
Rate
2.1.1.6 FOR SEVERAL TRAINING & SPECIAL EVENT FROM KAB. TO BANDA ACEH
a
b c d e
f g
a
b c d e
f g
1
2
3
4
5
For Training Inland Transport for Korkot&Askot (13 Kota/Kab) on OC Consolidation From Sabang to Banda Aceh Sea Transport Inlandtranport From Aceh Besar to Banda Aceh Tranport From Aceh Barat to Banda Aceh Tranport From Pidie & Lhokseumawe to Banda Aceh Tranport From Aceh Tengah, Aceh Tenggara & Gayo Lues to Banda Aceh From Aceh Tengah, Aceh Tenggara to Banda Aceh Tranport From Aceh Selatan & Subulussalam to Banda Aceh Tranport From Langsa & Aceh Tamiang to Banda Aceh Tranport Inland Transport for SF, FT, FE, FS (13 Kota/Kab) From Sabang to Banda Aceh Sea Transport Inlandtranport From Aceh Besar to Banda Aceh Tranport From Aceh Barat to Banda Aceh Tranport From Pidie & Lhokseumawe to Banda Aceh Tranport From Aceh Tengah, Aceh Tenggara & Gayo Lues to Banda Aceh From Aceh Tengah, Aceh Tenggara to Banda Aceh Tranport From Aceh Selatan & Subulussalam to Banda Aceh Tranport From Langsa & Aceh Tamiang to Banda Aceh Tranport Special Event (by request) From Sabang to Banda Aceh Sea Transport Tranport Acomodation OSA From Aceh Besar to Banda Aceh Tranport Acomodation OSA From Aceh Barat to Banda Aceh Tranport Acomodation OSA From Pidie & Lhokseumawe to Banda Aceh Tranport Acomodation OSA From Aceh Tengah, Aceh Tenggara & Gayo Lues to Banda Aceh From Aceh Tengah, Aceh Tenggara to Banda Aceh Tranport Acomodation OSA
INVOICE LALU
INVOICE SAAT INI
INVOICE S/D SAAT INI
SISA KONTRAK
UNIT Jumlah
Vol
Rate
62.500.000
Jumlah
Vol
Rate
158.100
Jumlah
Vol
Rate
-
Jumlah
Vol
Rate
158.100
Jumlah 62.341.900
trip trip
5 5
300.000 100.000
1.500.000 500.000
-
300.000 100.000
-
300.000 100.000
-
-
300.000 100.000
-
5 5
300.000 100.000
1.500.000 500.000
trip
2
100.000
200.000
-
100.000
-
100.000
-
-
100.000
-
2
100.000
200.000
trip
14
300.000
4.200.000
1
300.000
158.100
300.000
-
1
300.000
158.100
13
300.000
4.041.900
trip
22
200.000
4.400.000
-
200.000
-
200.000
-
-
200.000
-
22
200.000
4.400.000
trip
30
600.000
18.000.000
-
600.000
-
600.000
-
-
600.000
-
30
600.000
18.000.000
trip
12
400.000
4.800.000
-
400.000
-
400.000
-
-
400.000
-
12
400.000
4.800.000
trip
12
300.000
3.600.000
-
300.000
-
300.000
-
-
300.000
-
12
300.000
3.600.000
trip trip
5 5
300.000 100.000
1.500.000 500.000
-
300.000 100.000
-
300.000 100.000
-
-
300.000 100.000
-
5 5
300.000 100.000
1.500.000 500.000
trip
3
100.000
300.000
-
100.000
-
100.000
-
-
100.000
-
3
100.000
300.000
trip
5
300.000
1.500.000
-
300.000
-
300.000
-
-
300.000
-
5
300.000
1.500.000
trip
10
200.000
2.000.000
-
200.000
-
200.000
-
-
200.000
-
10
200.000
2.000.000
trip
15
600.000
9.000.000
-
600.000
-
600.000
-
-
600.000
-
15
600.000
9.000.000
trip
15
400.000
6.000.000
-
400.000
-
400.000
-
-
400.000
-
15
400.000
6.000.000
trip
15
300.000
4.500.000
-
300.000
-
300.000
-
-
300.000
-
15
300.000
4.500.000
trip trip m/d m/d
-
300.000 100.000 300.000 50.000
-
-
300.000 100.000 300.000 50.000
-
300.000 100.000 300.000 50.000
-
-
300.000 100.000 300.000 50.000
-
-
300.000 100.000 300.000 50.000
-
trip m/d m/d
-
100.000 300.000 50.000
-
-
100.000 300.000 50.000
-
100.000 300.000 50.000
-
-
100.000 300.000 50.000
-
-
100.000 300.000 50.000
-
trip m/d m/d
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
trip m/d m/d
-
200.000 300.000 50.000
-
-
200.000 300.000 50.000
-
200.000 300.000 50.000
-
-
200.000 300.000 50.000
-
-
200.000 300.000 50.000
-
trip m/d m/d
-
600.000 300.000 50.000
-
-
600.000 300.000 50.000
-
600.000 300.000 50.000
-
-
600.000 300.000 50.000
-
-
600.000 300.000 50.000
II.3 // 20 of 50 -
AMENDEMENT CONTRACT NO. 7 NO
URAIAN
Vol 6
7
From Aceh Selatan & Subulussalam to Banda Aceh Tranport Acomodation OSA From Langsa & Aceh Tamiang to Banda Aceh Tranport Acomodation OSA
2.1.2 TO JAKARTA 2.1.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST Air Transport In land Travel in Jakarta OSA Hotel Accommodation 2.1.2.2 FOR EGM TO JAKARTA Air Transport 1 EGM TA/SubTA Training 2 EGM TA Sosialisasi 3 EGM TA/SubTA MK/Sub TA RLF 4 EGM TA/SubTA INFRA/Sub TA Safeguard 5 EGM TA/SubTA Monev /Sub TA Legal HCU 6 EGM TA/SubTA SIM 7 EGM TA Local Goverment 8 EGM TA Livelihood & SME's 9 EGM TA Urban Planner In land Transport in Jakarta OSA Hotel Accommodation 2.1.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) Air Transport In land Transport in Jakarta Hotel Accommodation OSA
Rate
TOTAL DUTY TRAVEL PROVINCE NAD
Jumlah
Vol
Rate
INVOICE SAAT INI Jumlah
Vol
Rate
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
SISA KONTRAK
Jumlah
Vol
Rate
Jumlah
trip m/d m/d
-
400.000 300.000 50.000
-
-
400.000 300.000 50.000
-
400.000 300.000 50.000
-
-
400.000 300.000 50.000
-
-
400.000 300.000 50.000
-
trip m/d m/d
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
trip trip trip trip
6 6 44 -
2.500.000 200.000 100.000 350.000
11.272.000 5.672.000 1.200.000 4.400.000 -
6 6 44 -
2.500.000 200.000 100.000 350.000
11.272.000 5.672.000 1.200.000 4.400.000 -
2.500.000 200.000 100.000 350.000
-
6 6 44 -
2.500.000 200.000 100.000 350.000
11.272.000 5.672.000 1.200.000 4.400.000 -
-
2.500.000 200.000 100.000 350.000
-
30.598.950
25.151.000
-
25.151.000
5.447.950
trip trip trip trip trip trip trip trip trip
2 2 2 2 4 2 2 2 2
2.500.000 2.500.000 2.500.000 2.500.000 2.500.000 2.500.000 2.500.000 2.500.000 2.500.000
1.523.000 2.047.950 1.523.000 3.307.000 4.497.000 1.834.000 2.480.000 1.603.000 1.784.000
2 2 2 2 4 2 2 2
2.500.000 2.500.000 2.500.000 2.500.000 2.500.000 2.500.000 2.500.000 2.500.000 2.500.000
1.523.000 80.000 1.523.000 3.307.000 3.497.000 1.834.000 1.603.000 1.784.000
2.500.000 2.500.000 2.500.000 2.500.000 2.500.000 2.500.000 2.500.000 2.500.000 2.500.000
-
2 2 2 2 4 2 2 2
2.500.000 2.500.000 2.500.000 2.500.000 2.500.000 2.500.000 2.500.000 2.500.000 2.500.000
1.523.000 80.000 1.523.000 3.307.000 3.497.000 1.834.000 1.603.000 1.784.000
2 -
2.500.000 2.500.000 2.500.000 2.500.000 2.500.000 2.500.000 2.500.000 2.500.000 2.500.000
1.967.950 1.000.000 2.480.000 -
trip m/d trip
20 80 -
200.000 100.000 350.000
2.000.000 8.000.000 -
20 80 -
200.000 100.000 350.000
2.000.000 8.000.000 -
200.000 100.000 350.000
-
20 80 -
200.000 100.000 350.000
2.000.000 8.000.000 -
-
200.000 100.000 350.000
-
trip trip m/d m/d
1 1 3 4
2.500.000 200.000 350.000 100.000
4.150.000 2.500.000 200.000 1.050.000 400.000
-
2.500.000 200.000 350.000 100.000
-
2.500.000 200.000 350.000 100.000
-
-
2.500.000 200.000 350.000 100.000
-
1 1 3 4
2.500.000 200.000 350.000 100.000
4.150.000 2.500.000 200.000 1.050.000 400.000
trip trip m/d m/d
2 2 6 8
4.000.000 300.000 350.000 100.000
11.500.000 8.000.000 600.000 2.100.000 800.000
1 1 2
4.000.000 300.000 350.000 100.000
2.870.500 2.525.500 145.000 200.000
4.000.000 300.000 350.000 100.000
-
1 1 2
4.000.000 300.000 350.000 100.000
2.870.500 2.525.500 145.000 200.000
1 1 6 6
4.000.000 300.000 350.000 100.000
8.629.500 5.474.500 455.000 2.100.000 600.000
2.1.2.4 FROM PROVINCE (KMW NAD) TO OTHER PROVINCE (by request) Air Transport In land Transport in Jakarta Hotel Accommodation OSA
INVOICE LALU
UNIT
191.320.950
70.371.110
-
70.371.110
120.949.840
II.3 // 21 of 50
II DIRECT REEIMBURSABLE COST 2.4. DUTY TRAVEL EXPENSES PROVINCE SUMATERA UTARA NO.
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Jumlah
INVOICE LALU Vol
Rate
INVOICE SAAT INI Jumlah
Vol
Rate
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
SISA KONTRAK
Jumlah
Vol
Rate
Jumlah
2.2.1. IN PROVINCE 2.2.1.1 FOR SPOTCHECK PROVINCE TO KELURAHAN (3 % x No. of Kelurahan) a From Medan to Binjai & Langkat (62 kel x 3% = 5 kel) Tranport trip Several transport to Langkat (Remote Village) trip Lumpsum m/d b From Medan to Deli Serdang & Tebing Tinggi (136 kel x 3% = 12 kel) Tranport trip Lumpsum m/d c From Medan to Asahan, Tanjung Balai & Lab. Batu (75 kel x 3% = 7 kel) Tranport trip Acomodation m/d Lumpsum m/d d From Medan to Tanah Karo & Dairi (33 kel x 3% = 3 kel) Tranport trip Acomodation m/d Lumpsum m/d e From Medan to Simalungun & Pematang Siantar (60 kel x 3% = 6 kel) Tranport trip Several transport to Simalungun (Remote Village) trip Acomodation m/d Lumpsum m/d f From Medan to Sibolga & Padang Sidempuan (96 kel x 3% = 9 kel) Tranport trip Acomodation m/d Lumpsum m/d g From Medan to Medan (149 kel x 3% = 12 kel) Lumpsum m/d
47.700.000
2
3
4
5
6
-
-
47.700.000
12 6 36
200.000 200.000 50.000
2.400.000 1.200.000 1.800.000
-
200.000 200.000 50.000
-
200.000 200.000 50.000
-
-
200.000 200.000 50.000
-
12 6 36
200.000 200.000 50.000
2.400.000 1.200.000 1.800.000
18 72
200.000 50.000
3.600.000 3.600.000
-
200.000 50.000
-
200.000 50.000
-
-
200.000 50.000
-
18 72
200.000 50.000
3.600.000 3.600.000
12 24 36
200.000 300.000 50.000
2.400.000 7.200.000 1.800.000
-
200.000 300.000 50.000
-
200.000 300.000 50.000
-
-
200.000 300.000 50.000
-
12 24 36
200.000 300.000 50.000
2.400.000 7.200.000 1.800.000
6 6 12
200.000 300.000 50.000
1.200.000 1.800.000 600.000
-
200.000 300.000 50.000
-
200.000 300.000 50.000
-
-
200.000 300.000 50.000
-
6 6 12
200.000 300.000 50.000
1.200.000 1.800.000 600.000
6 6 12 18
200.000 200.000 300.000 50.000
1.200.000 1.200.000 3.600.000 900.000
-
200.000 200.000 300.000 50.000
-
200.000 200.000 300.000 50.000
-
-
200.000 200.000 300.000 50.000
-
6 6 12 18
200.000 200.000 300.000 50.000
1.200.000 1.200.000 3.600.000 900.000
12 24 36
200.000 300.000 50.000
2.400.000 7.200.000 1.800.000
-
200.000 300.000 50.000
-
200.000 300.000 50.000
-
-
200.000 300.000 50.000
-
12 24 36
200.000 300.000 50.000
2.400.000 7.200.000 1.800.000
36
50.000
1.800.000
-
50.000
-
50.000
-
-
50.000
-
36
50.000
1.800.000
2.2.1.2 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM
1
-
124.700.000
-
-
-
124.700.000
A. For City Coordinator and Assistance City Coordinator (611 Kel x 50%) x 4 Cost / Day Rp. 50.000.- 1 Day cover 2 kel
trip
611
50.000
30.550.000
-
50.000
-
50.000
-
-
50.000
-
611
50.000
30.550.000
B. For Ass. City Coordinator Infrastructure and FM in the city (611 Kel - 114 Kel luar kota) x 50%) x 14 Cost / Day Rp. 50.000.- 1 Day cover 2 kel
trip
497
50.000
24.850.000
-
50.000
-
50.000
-
-
50.000
-
497
50.000
24.850.000
trip trip
88 88
100.000 50.000
8.800.000 4.400.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
88 88
100.000 50.000
8.800.000 4.400.000
trip trip
132 132
100.000 50.000
13.200.000 6.600.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
132 132
100.000 50.000
13.200.000 6.600.000
trip trip
66 66
100.000 50.000
6.600.000 3.300.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
66 66
100.000 50.000
6.600.000 3.300.000
trip trip
44 44
100.000 50.000
4.400.000 2.200.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
44 44
100.000 50.000
4.400.000 2.200.000
trip trip
66 66
100.000 50.000
6.600.000 3.300.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
66 66
100.000 50.000
6.600.000 3.300.000
trip trip
66 66
100.000 50.000
6.600.000 3.300.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
66 66
100.000 50.000
6.600.000 II.4 // 22 of 50 3.300.000
C. For City Coordinator Infrastructure and FM out of te town From Binjai to Langkat Transport Lumpsum From Tanjung Balai to Asahan From Deli Serdang, Tebing Tinggi to Asahan Transport Lumpsum From Tanjung Balai to Lab. Batu Transport Lumpsum From Tanah Karo to Dairi Transport Lumpsum From Pemantang Siantar to Simalungun Transport Lumpsum From Padang Sidempuan to Sibolga Transport Lumpsum
NO.
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
2.2.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL a From Binjai to Langkat Tranport Lumpsum b From Tanjung Balai to Asahan From Tebing Tinggi to Asahan Tranport Lumpsum c From Tanjung Balai to Lab. Batu Tranport Lumpsum d From Tanah Karo to Dairi Tranport Lumpsum e From Pemantang Siantar to Simalungun Tranport Lumpsum f From Padang Sidempuan to Sibolga Tranport Lumpsum 2.2.1.4 FROM KAB/KOTA TO TL OFFICE FOR COORDIANTION MEETING a From Binjai & Langkat to Medan Tranport Acomodation OSA b From Deli Serdang & Tebing Tinggi to Medan Tranport Acomodation OSA c From Asahan, Tanjung Balai & Lab. Batu to Medan Tranport Acomodation OSA d From Tanah Karo & Dairi to Medan Tranport Acomodation OSA e From Simalungun & Pematang Siantar to Medan Tranport Acomodation OSA f From Sibolga & Padang Sidempuan to Medan Tranport Acomodation OSA
Rate
Jumlah
INVOICE LALU Vol
Rate
5.400.000
INVOICE SAAT INI Jumlah
Vol
Rate
-
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
-
SISA KONTRAK
Jumlah
Vol
Rate
-
Jumlah 5.400.000
trip m/d
6 6
100.000 50.000
600.000 300.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
6 6
100.000 50.000
600.000 300.000
trip m/d
6 6
100.000 50.000
600.000 300.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
6 6
100.000 50.000
600.000 300.000
trip m/d
6 6
100.000 50.000
600.000 300.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
6 6
100.000 50.000
600.000 300.000
trip m/d
6 6
100.000 50.000
600.000 300.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
6 6
100.000 50.000
600.000 300.000
trip m/d
6 6
100.000 50.000
600.000 300.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
6 6
100.000 50.000
600.000 300.000
trip m/d
6 6
100.000 50.000
600.000 300.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
6 6
100.000 50.000
600.000 300.000
225.900.000
16.050.000
-
16.050.000
209.850.000
trip m/d m/d
36 72 108
100.000 300.000 50.000
3.600.000 21.600.000 5.400.000
6 4 8
100.000 300.000 50.000
550.000 1.200.000 400.000
100.000 300.000 50.000
-
6 4 8
100.000 300.000 50.000
550.000 1.200.000 400.000
30 68 100
100.000 300.000 50.000
3.050.000 20.400.000 5.000.000
trip m/d m/d
36 72 108
150.000 300.000 50.000
5.400.000 21.600.000 5.400.000
4 4 8
150.000 300.000 50.000
600.000 1.200.000 400.000
150.000 300.000 50.000
-
4 4 8
150.000 300.000 50.000
600.000 1.200.000 400.000
32 68 100
150.000 300.000 50.000
4.800.000 20.400.000 5.000.000
trip m/d m/d
54 108 162
300.000 300.000 50.000
16.200.000 32.400.000 8.100.000
6 6 12
300.000 300.000 50.000
1.700.000 1.800.000 600.000
300.000 300.000 50.000
-
6 6 12
300.000 300.000 50.000
1.700.000 1.800.000 600.000
48 102 150
300.000 300.000 50.000
14.500.000 30.600.000 7.500.000
trip m/d m/d
36 72 108
200.000 300.000 50.000
7.200.000 21.600.000 5.400.000
4 4 8
200.000 300.000 50.000
800.000 1.200.000 400.000
200.000 300.000 50.000
-
4 4 8
200.000 300.000 50.000
800.000 1.200.000 400.000
32 68 100
200.000 300.000 50.000
6.400.000 20.400.000 5.000.000
trip m/d m/d
36 72 108
200.000 300.000 50.000
7.200.000 21.600.000 5.400.000
4 4 8
200.000 300.000 50.000
800.000 1.200.000 400.000
200.000 300.000 50.000
-
4 4 8
200.000 300.000 50.000
800.000 1.200.000 400.000
32 68 100
200.000 300.000 50.000
6.400.000 20.400.000 5.000.000
trip m/d m/d
36 72 108
300.000 300.000 50.000
10.800.000 21.600.000 5.400.000
4 4 8
300.000 300.000 50.000
1.200.000 1.200.000 400.000
300.000 300.000 50.000
-
4 4 8
300.000 300.000 50.000
1.200.000 1.200.000 400.000
32 68 100
300.000 300.000 50.000
9.600.000 20.400.000 5.000.000
2.2.1.5 FOR SEVERAL TRAINING & SPECIAL EVENT FROM KAB. TO MEDAN For Training Transport for Korkot &Askot (14 Kota/Kab) on OSP Consolidation a From Binjai & Langkat to Medan Tranport trip b From Deli Serdang & Tebing Tinggi to Medan Tranport trip c From Asahan, Tanjung Balai & Lab. Batu to Medan Tranport trip d From Tanah Karo & Dairi to Medan Tranport trip e From Simalungun & Pematang Siantar to Medan Tranport trip
279.450.000
-
-
-
279.450.000
16
100.000
1.600.000
-
100.000
-
100.000
-
-
100.000
-
16
100.000
1.600.000
16
150.000
2.400.000
-
150.000
-
150.000
-
-
150.000
-
16
150.000
2.400.000
24
300.000
7.200.000
-
300.000
-
300.000
-
-
300.000
-
24
300.000
7.200.000
16
200.000
3.200.000
-
200.000
-
200.000
-
-
200.000
-
16
200.000
3.200.000
16
200.000
3.200.000
-
200.000
-
200.000
-
-
200.000
-
16
200.000
II.4 // 23 of 50 3.200.000
NO.
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
f
a b c d e f
1
2
3
4
5
6
From Sibolga & Padang Sidempuan to Medan Tranport
Rate
INVOICE LALU
Jumlah
Vol
Rate
INVOICE SAAT INI Jumlah
Vol
Rate
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
SISA KONTRAK
Jumlah
Vol
Rate
Jumlah
trip
16
300.000
4.800.000
-
300.000
-
300.000
-
-
300.000
-
16
300.000
4.800.000
trip
35
100.000
3.500.000
-
100.000
-
100.000
-
-
100.000
-
35
100.000
3.500.000
trip
74
150.000
11.100.000
-
150.000
-
150.000
-
-
150.000
-
74
150.000
11.100.000
trip
41
300.000
12.300.000
-
300.000
-
300.000
-
-
300.000
-
41
300.000
12.300.000
trip
16
200.000
3.200.000
-
200.000
-
200.000
-
-
200.000
-
16
200.000
3.200.000
trip
35
200.000
7.000.000
-
200.000
-
200.000
-
-
200.000
-
35
200.000
7.000.000
trip
54
300.000
16.200.000
-
300.000
-
300.000
-
-
300.000
-
54
300.000
16.200.000
trip m/d m/d
-
100.000 300.000 50.000
-
-
100.000 300.000 50.000
-
100.000 300.000 50.000
-
-
100.000 300.000 50.000
-
-
100.000 300.000 50.000
-
trip m/d m/d
-
150.000 300.000 50.000
-
-
150.000 300.000 50.000
-
150.000 300.000 50.000
-
-
150.000 300.000 50.000
-
-
150.000 300.000 50.000
-
trip m/d m/d
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
trip m/d m/d
-
200.000 300.000 50.000
-
-
200.000 300.000 50.000
-
200.000 300.000 50.000
-
-
200.000 300.000 50.000
-
-
200.000 300.000 50.000
-
trip m/d m/d
-
200.000 300.000 50.000
-
-
200.000 300.000 50.000
-
200.000 300.000 50.000
-
-
200.000 300.000 50.000
-
-
200.000 300.000 50.000
-
trip m/d m/d
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
BRIDGING (July 2014 to April 2015) 1. Konsolidasi Pemandu Pelatihan Penguatan Pemda dan Stakeholder a. Tranport From Kab to Medan - Binjai & Langkat trip - Deli Serdang & Tebing Tinggi trip - Asahan, Tanjung Balai & Lab. Batu trip - Tanah Karo & Dairi trip - Simalungun & Pematang Siantar trip - Sibolga & Padang Sidempuan trip
-
100.000 150.000 300.000 200.000 200.000 300.000
-
-
100.000 150.000 300.000 200.000 200.000 300.000
-
100.000 150.000 300.000 200.000 200.000 300.000
-
-
100.000 150.000 300.000 200.000 200.000 300.000
-
-
100.000 150.000 300.000 200.000 200.000 300.000
-
2. Pelatihan Penguatan Pemda dan Stakeholder a. Tranport From Kab to Medan - Binjai & Langkat - Deli Serdang & Tebing Tinggi - Asahan, Tanjung Balai & Lab. Batu - Tanah Karo & Dairi - Simalungun & Pematang Siantar - Sibolga & Padang Sidempuan
-
100.000 150.000 300.000 200.000 200.000 300.000
-
-
100.000 150.000 300.000 200.000 200.000 300.000
-
100.000 150.000 300.000 200.000 200.000 300.000
-
-
100.000 150.000 300.000 200.000 200.000 300.000
-
-
100.000 150.000 300.000 200.000 200.000 300.000
Inland Transport for SF, FK, FE, FS (14 Kota/Kab) From Binjai & Langkat to Medan Tranport From Deli Serdang & Tebing Tinggi to Medan Tranport From Asahan, Tanjung Balai & Lab. Batu to Medan Tranport From Tanah Karo & Dairi to Medan Tranport From Simalungun & Pematang Siantar to Medan Tranport From Sibolga & Padang Sidempuan to Medan Tranport Special Event (by request) From Binjai & Langkat to Medan Tranport Acomodation OSA From Deli Serdang & Tebing Tinggi to Medan Tranport Acomodation OSA From Asahan, Tanjung Balai & Lab. Batu to Medan Tranport Acomodation OSA From Tanah Karo & Dairi to Medan Tranport Acomodation OSA From Simalungun & Pematang Siantar to Medan Tranport Acomodation OSA From Sibolga & Padang Sidempuan to Medan Tranport Acomodation OSA
trip trip trip trip trip trip
II.4 //- 24 of 50 -
NO.
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
INVOICE LALU
Jumlah
Vol
Rate
INVOICE SAAT INI Jumlah
Vol
Rate
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
SISA KONTRAK
Jumlah
Vol
Rate
Jumlah
3. Konsolidasi Pemandu Pelatihan Penguatan Askot dan Fasilitator a. Tranport From Kab to Medan - Binjai & Langkat - Deli Serdang & Tebing Tinggi - Asahan, Tanjung Balai & Lab. Batu - Tanah Karo & Dairi - Simalungun & Pematang Siantar - Sibolga & Padang Sidempuan
trip trip trip trip trip trip
-
100.000 150.000 300.000 200.000 200.000 300.000
-
-
100.000 150.000 300.000 200.000 200.000 300.000
-
100.000 150.000 300.000 200.000 200.000 300.000
-
-
100.000 150.000 300.000 200.000 200.000 300.000
-
-
100.000 150.000 300.000 200.000 200.000 300.000
-
4. Pelatihan Penguatan Askot dan Fasilitator a. Tranport From Kab to Medan - Binjai & Langkat - Deli Serdang & Tebing Tinggi - Asahan, Tanjung Balai & Lab. Batu - Tanah Karo & Dairi - Simalungun & Pematang Siantar - Sibolga & Padang Sidempuan
trip trip trip trip trip trip
-
100.000 150.000 300.000 200.000 200.000 300.000
-
-
100.000 150.000 300.000 200.000 200.000 300.000
-
100.000 150.000 300.000 200.000 200.000 300.000
-
-
100.000 150.000 300.000 200.000 200.000 300.000
-
-
100.000 150.000 300.000 200.000 200.000 300.000
-
100.000 150.000 300.000 200.000 200.000 300.000
-
-
100.000 150.000 300.000 200.000 200.000 300.000
-
100.000 150.000 300.000 200.000 200.000 300.000
-
-
100.000 150.000 300.000 200.000 200.000 300.000
-
-
100.000 150.000 300.000 200.000 200.000 300.000
-
150.000 300.000 200.000 200.000 200.000 300.000
300.000 4.800.000 5.200.000 2.600.000 3.400.000 4.500.000
-
150.000 300.000 200.000 200.000 200.000 300.000
-
150.000 300.000 200.000 200.000 200.000 300.000
-
-
150.000 300.000 200.000 200.000 200.000 300.000
-
2 16 26 13 17 15
150.000 300.000 200.000 200.000 200.000 300.000
300.000 4.800.000 5.200.000 2.600.000 3.400.000 4.500.000
150.000 300.000 200.000 200.000 200.000 300.000
-
-
150.000 300.000 200.000 200.000 200.000 300.000
-
150.000 300.000 200.000 200.000 200.000 300.000
-
-
150.000 300.000 200.000 200.000 200.000 300.000
-
-
150.000 300.000 200.000 200.000 200.000 300.000
-
2 6 7 6 6 6
150.000 300.000 200.000 200.000 200.000 300.000
300.000 1.800.000 1.400.000 1.200.000 1.200.000 1.800.000
-
150.000 300.000 200.000 200.000 200.000 300.000
-
150.000 300.000 200.000 200.000 200.000 300.000
-
-
150.000 300.000 200.000 200.000 200.000 300.000
-
2 6 7 6 6 6
150.000 300.000 200.000 200.000 200.000 300.000
300.000 1.800.000 1.400.000 1.200.000 1.200.000 1.800.000
221
250.000
55.250.000
-
250.000
-
250.000
-
-
250.000
-
221
250.000
55.250.000
250.000
120.000.000
-
250.000
-
250.000
-
-
250.000
-
480
250.000
5. Konsolidasi Pemandu Pelatihan PLPBK a. Tranport From Kab to Medan - Binjai & Langkat - Deli Serdang & Tebing Tinggi - Asahan, Tanjung Balai & Lab. Batu - Tanah Karo & Dairi - Simalungun & Pematang Siantar - Sibolga & Padang Sidempuan
trip trip trip trip trip trip
6. Pelatihan Dasar PLBPK a. Tranport From Kab to Medan - Binjai & Langkat - Deli Serdang & Tebing Tinggi - Asahan, Tanjung Balai & Lab. Batu - Tanah Karo & Dairi - Simalungun & Pematang Siantar - Sibolga & Padang Sidempuan
trip trip trip trip trip trip
7. Pelatihan Penguatan PLPBK a. Tranport From Kab to Medan - Binjai & Langkat - Deli Serdang & Tebing Tinggi - Asahan, Tanjung Balai & Lab. Batu - Tanah Karo & Dairi - Simalungun & Pematang Siantar - Sibolga & Padang Sidempuan
trip trip trip trip trip trip
8. Pelatihan Tim Teknis PLPBK a. Tranport From Kab to Medan - Binjai & Langkat - Deli Serdang & Tebing Tinggi - Asahan, Tanjung Balai & Lab. Batu - Tanah Karo & Dairi - Simalungun & Pematang Siantar - Sibolga & Padang Sidempuan
trip trip trip trip trip trip
2 16 26 13 17 15
9. Orientasi and Planning Training for Livelihood/PPMK (New Location FY 2014) a. Tranport From Kab to Medan
trip
10. Advance Training for Livelihood/PPMK (Location FY 2012) and (Location 2014) a. Tranport From Kab to Medan
trip
480
120.000.000 II.4 // 25 of 50
NO.
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Jumlah
INVOICE LALU Vol
Rate
INVOICE SAAT INI Jumlah
Vol
Rate
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
SISA KONTRAK
Jumlah
Vol
Rate
Jumlah
BRIDGING (Mei to Desember 2015) 1. Konsolidasi Pemandu Pelatihan Pemerintah Daerah a. Tranport From Kab to Medan
trip
24
250.000
6.000.000
-
250.000
-
250.000
-
-
250.000
-
24
250.000
6.000.000
2. Pelatihan Pemerintah Daerah a. Tranport From Kab to Medan
trip
70
250.000
17.500.000
-
250.000
-
250.000
-
-
250.000
-
70
250.000
17.500.000
3. Konsolidasi Pemandu Pelatihan Penguatan Program Lanjutan a. Tranport From Kab to Medan
trip
21
250.000
5.250.000
-
250.000
-
250.000
-
-
250.000
-
21
250.000
5.250.000
4. Pelatihan Penguatan Program Lanjutan a. Tranport From Kab to Medan
trip
430
250.000
107.500.000
-
250.000
-
250.000
-
-
250.000
-
430
250.000
107.500.000
5. Pelatihan Penguatan PLPBK a. Tranport From Kab to Medan
trip
97
250.000
24.250.000
-
250.000
-
250.000
-
-
250.000
-
97
250.000
24.250.000
trip
154
250.000
38.500.000
-
250.000
-
250.000
-
-
250.000
-
154
250.000
38.500.000
a. Tranport From Kab to Medan
trip
16
250.000
4.000.000
-
250.000
-
250.000
-
-
250.000
-
16
250.000
4.000.000
8. Pelatihan Khusus Askot MK dan Faskel Ekonomi a. Tranport From Kab to Medan
trip
84
250.000
21.000.000
-
250.000
-
250.000
-
-
250.000
-
84
250.000
21.000.000
9. Pelatihan Aplikasi Pembukuan UPK (Computerize System) a. Tranport From Kab to Medan
trip
100
250.000
25.000.000
-
250.000
-
250.000
-
-
250.000
-
100
250.000
25.000.000
trip trip trip trip
58 83 507 170
1.800.000 200.000 100.000 350.000
37 53 387 40
1.800.000 200.000 100.000 350.000
37 53 387 40
1.800.000 200.000 100.000 350.000
21 30 120 130
1.800.000 200.000 100.000 350.000
6. Pelatihan Penguatan PPMK a. Tranport From Kab to Medan 7. Pelatihan SIM
2.2.2 TO JAKARTA 2.2.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST Air Transport In land Travel in Jakarta OSA Hotel Accommodation 2.2.2.2 FOR EGM TO JAKARTA Air Transport EGM TA/SubTA Training EGM TA Sosialisasi EGM TA/SubTA MK/Sub TA RLF EGM TA/SubTA INFRA/Sub TA Safeguard EGM TA/SubTA Monev /Sub TA Legal HCU EGM TA/SubTA SIM EGM TA Local Goverment EGM TA Livelihood & SME's EGM TA Urban Planner In land Transport in Jakarta OSA Hotel Accommodation 2.2.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) Air Transport In land Transport in Jakarta Hotel Accommodation OSA
231.235.200 104.435.200 16.600.000 50.700.000 59.500.000
140.870.650
287.837.000
80.570.650 9.600.000 38.700.000 12.000.000
1.800.000 200.000 100.000 350.000
77.904.200
-
140.870.650
-
80.570.650 9.600.000 38.700.000 12.000.000
90.364.550
77.904.200
23.864.550 7.000.000 12.000.000 47.500.000 209.932.800
trip trip trip trip trip trip trip trip trip
13 7 7 13 20 7 7 7 7
1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000
22.377.100 11.577.100 11.398.200 21.471.200 33.077.800 11.299.200 11.616.100 11.577.100 11.343.200
3 3 3 3 7 3 3 3 3
1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000
4.359.100 4.359.100 4.180.200 3.453.200 9.641.800 4.081.200 4.345.300 4.359.100 4.125.200
1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000
-
3 3 3 3 7 3 3 3 3
1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000
4.359.100 4.359.100 4.180.200 3.453.200 9.641.800 4.081.200 4.345.300 4.359.100 4.125.200
10 4 4 10 13 4 4 4 4
1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000
18.018.000 7.218.000 7.218.000 18.018.000 23.436.000 7.218.000 7.270.800 7.218.000 7.218.000
trip m/d trip
88 352 264
200.000 100.000 350.000
16.000.000 35.200.000 90.900.000
31 124 60
200.000 100.000 350.000
4.600.000 12.400.000 18.000.000
200.000 100.000 350.000
-
31 124 60
200.000 100.000 350.000
4.600.000 12.400.000 18.000.000
57 228 204
200.000 100.000 350.000
11.400.000 22.800.000 72.900.000
trip trip m/d m/d
16 16 64 48
1.800.000 200.000 350.000 100.000
59.200.000 28.800.000 3.200.000 22.400.000 4.800.000
3 1 9 12
1.800.000 200.000 350.000 100.000
8.908.000 4.808.000 200.000 2.700.000 1.200.000
1.800.000 200.000 350.000 100.000
-
3 1 9 12
1.800.000 200.000 350.000 100.000
8.908.000 4.808.000 200.000 2.700.000 1.200.000
13 15 55 36
1.800.000 200.000 350.000 100.000
50.292.000 23.992.000 3.000.000 19.700.000 3.600.000
II.4 // 26 of 50
NO.
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
2.2.2.4 FROM PROVINCE (KMW SUMUT) TO OTHER PROVINCE (by request) Air Transport In land Transport in Jakarta Hotel Accommodation OSA 2.2.3. PROGRAME DIRECTOR 2.2.3.1 Duty Travel for Program Director to Other Province a. From Medan to KMW Air Transport OSA [ Fixed ] Local Transport Accomodation TOTAL DUTY TRAVEL PROVINCE SUMATERA UTARA
trip trip m/d m/d
5 5 15 20
4.000.000 300.000 350.000 100.000
Jumlah 28.750.000 20.000.000 1.500.000 5.250.000 2.000.000
INVOICE LALU Vol
Rate 2 2 6
4.000.000 300.000 350.000 100.000
60.800.000 Trip m/d Trip m/d
19 57 19 38
2.000.000 100.000 200.000 350.000
38.000.000 5.700.000 3.800.000 13.300.000 1.350.972.200
INVOICE SAAT INI Jumlah 7.942.800 6.942.800 400.000 600.000
Vol
Rate 4.000.000 300.000 350.000 100.000
375.000 1 3 -
2.000.000 100.000 200.000 350.000
75.000 300.000 252.050.650
INVOICE S/D SAAT INI
Jumlah
Vol -
2 2 6
Rate 4.000.000 300.000 350.000 100.000
2.000.000 100.000 200.000 350.000
-
Jumlah 7.942.800 6.942.800 400.000 600.000
SISA KONTRAK Vol 3 3 15 14
Rate 4.000.000 300.000 350.000 100.000
375.000 1 3 -
2.000.000 100.000 200.000 350.000
75.000 300.000 252.050.650
Jumlah 20.807.200 13.057.200 1.100.000 5.250.000 1.400.000
60.425.000 18 54 19 38
2.000.000 100.000 200.000 350.000
37.925.000 5.400.000 3.800.000 13.300.000 1.098.921.550
II.4 // 27 of 50
II DIRECT REEIMBURSABLE COST 2.5. DUTY TRAVEL EXPENSES PROVINCE SUMATERA BARAT NO
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
2.3.1 IN PROVINCE 2.3.1.1 FOR SPOTCHECK PROVINCE TO KELURAHAN (3 % x No. of Kelurahan) a From Padang to Agam, Bukit Tinggi & Padang Panjang (47 kel x 3% = 8 kel) Tranport trip Acomodation m/d Lumpsum m/d b From Padang to Padang Pariaman & Pariaman (81 kel x 3% = 12 kel) Tranport trip Acomodation m/d Lumpsum m/d c From Padang to Limapuluh Kota & Payakumbuh (80 kel x 3% = 11 kel) Tranport trip Acomodation m/d Lumpsum m/d d From Padang to Solok, Sawah Lunto & Sijunjung (59 kel x 3% = 9 kel) Tranport trip Several transport to Sijunjung (Remote Village) trip Acomodation m/d Lumpsum m/d e From Padang to Padang (104 kel x 3% = 14 kel) Lumpsum m/d
Rate
2
3
4
5
6
Vol
Rate
41.400.000
INVOICE SAAT INI
Jumlah
Vol
Rate
2.500.000
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
-
SISA KONTRAK
Jumlah
Vol
Rate
2.500.000
Jumlah 38.900.000
12 12 24
200.000 300.000 50.000
2.400.000 3.600.000 1.200.000
2 2 2
200.000 300.000 50.000
350.000 550.000 100.000
200.000 300.000 50.000
-
2 2 2
200.000 300.000 50.000
350.000 550.000 100.000
10 10 22
200.000 300.000 50.000
2.050.000 3.050.000 1.100.000
18 18 36
150.000 300.000 50.000
2.700.000 5.400.000 1.800.000
1 2
150.000 300.000 50.000
150.000 100.000
150.000 300.000 50.000
-
1 2
150.000 300.000 50.000
150.000 100.000
17 18 34
150.000 300.000 50.000
2.550.000 5.400.000 1.700.000
18 18 36
250.000 300.000 50.000
4.500.000 5.400.000 1.800.000
2 2 4
250.000 300.000 50.000
350.000 500.000 200.000
250.000 300.000 50.000
-
2 2 4
250.000 300.000 50.000
350.000 500.000 200.000
16 16 32
250.000 300.000 50.000
4.150.000 4.900.000 1.600.000
12 6 12 24
300.000 300.000 300.000 50.000
3.600.000 1.800.000 3.600.000 1.200.000
4
300.000 300.000 300.000 50.000
200.000
300.000 300.000 300.000 50.000
-
4
300.000 300.000 300.000 50.000
200.000
12 6 12 20
300.000 300.000 300.000 50.000
3.600.000 1.800.000 3.600.000 1.000.000
48
50.000
2.400.000
-
50.000
-
50.000
-
-
50.000
-
48
50.000
2.400.000
2.3.1.2 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM
1
Jumlah
INVOICE LALU
123.550.000
31.250.000
-
31.250.000
92.300.000
A. For City Coordinator and Assistance City Coordinator (371 Kel x 50%) x 4 Cost / Day Rp. 50.000.- 1 Day cover 2 kel
trip
557
50.000
27.850.000
183
50.000
9.150.000
50.000
-
183
50.000
9.150.000
374
50.000
18.700.000
B. For Ass. City Coordinator Infrastructure and FM in the city (371 Kel - 62 Kel luar kota) x 50%) x 14 Cost / Day Rp. 50.000.- 1 Day cover 2 kel
trip
924
50.000
46.200.000
442
50.000
22.100.000
50.000
-
442
50.000
22.100.000
482
50.000
24.100.000
trip trip
30 30
100.000 50.000
3.000.000 1.500.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
30 30
100.000 50.000
3.000.000 1.500.000
trip trip
90 90
100.000 50.000
9.000.000 4.500.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
90 90
100.000 50.000
9.000.000 4.500.000
trip trip
60 60
100.000 50.000
6.000.000 3.000.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
60 60
100.000 50.000
6.000.000 3.000.000
trip trip
30 30
100.000 50.000
3.000.000 1.500.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
30 30
100.000 50.000
3.000.000 1.500.000
trip trip
60 60
100.000 50.000
6.000.000 3.000.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
60 60
100.000 50.000
6.000.000 3.000.000
trip trip
60 60
100.000 50.000
6.000.000 3.000.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
60 60
100.000 50.000
6.000.000 3.000.000
C. For City Coordinator Infrastructure and FM out of te town From Bukit Tinggi to Agam Transport Lumpsum From Bukit Tinggi to Padang Panjang Transport Lumpsum From Pariaman to Padang Pariaman From Bukit Tinggi to Padang Pariaman Transport Lumpsum From Payakumbuh to Limapuluh Kota Transport Lumpsum From Sawah Lunto to Solok Transport Lumpsum From Sawah Lunto to Sijunjung Transport Lumpsum
II.5 // 28 of 50
NO
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
2.3.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL a From Bukit Tinggi to Agam Tranport Lumpsum b From Bukit Tinggi to Padang Panjang Tranport Lumpsum c From Pariaman to Padang Pariaman From Bukit Tinggi to Padang Pariaman Tranport Lumpsum d From Payakumbuh to Limapuluh Kota Tranport Lumpsum e From Sawah Lunto to Solok Tranport Lumpsum f From Sawah Lunto to Sijunjung Tranport Lumpsum
Rate
c d
Vol
Rate
-
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
-
SISA KONTRAK
Jumlah
Vol
Rate
-
Jumlah 9.000.000
100.000 50.000
600.000 900.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
6 18
100.000 50.000
600.000 900.000
trip m/d
6 18
100.000 50.000
600.000 900.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
6 18
100.000 50.000
600.000 900.000
trip m/d
6 18
100.000 50.000
600.000 900.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
6 18
100.000 50.000
600.000 900.000
trip m/d
6 18
100.000 50.000
600.000 900.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
6 18
100.000 50.000
600.000 900.000
trip m/d
6 18
100.000 50.000
600.000 900.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
6 18
100.000 50.000
600.000 900.000
trip m/d
6 18
100.000 50.000
600.000 900.000
-
100.000 50.000
-
100.000 50.000
-
-
100.000 50.000
-
6 18
100.000 50.000
600.000 900.000
254.800.000
5.409.000
-
5.409.000
249.391.000
trip m/d m/d
78 156 234
200.000 300.000 50.000
15.600.000 46.800.000 11.700.000
3 3 6
200.000 300.000 50.000
450.000 900.000 300.000
200.000 300.000 50.000
-
3 3 6
200.000 300.000 50.000
450.000 900.000 300.000
75 153 228
200.000 300.000 50.000
15.150.000 45.900.000 11.400.000
trip m/d m/d
52 104 156
150.000 300.000 50.000
7.800.000 31.200.000 7.800.000
2 2 4
150.000 300.000 50.000
285.000 600.000 200.000
150.000 300.000 50.000
-
2 2 4
150.000 300.000 50.000
285.000 600.000 200.000
50 102 152
150.000 300.000 50.000
7.515.000 30.600.000 7.600.000
trip m/d m/d
52 104 156
250.000 300.000 50.000
13.000.000 31.200.000 7.800.000
2 2 4
250.000 300.000 50.000
300.000 600.000 200.000
250.000 300.000 50.000
-
2 2 4
250.000 300.000 50.000
300.000 600.000 200.000
50 102 152
250.000 300.000 50.000
12.700.000 30.600.000 7.600.000
trip m/d m/d
78 156 234
300.000 300.000 50.000
23.400.000 46.800.000 11.700.000
3 3 6
300.000 300.000 50.000
374.000 900.000 300.000
300.000 300.000 50.000
-
3 3 6
300.000 300.000 50.000
374.000 900.000 300.000
75 153 228
300.000 300.000 50.000
23.026.000 45.900.000 11.400.000
Trip Man/Days Trip Man/Days
For Training Transport for Korkot &Askot (11 Kota/Kab) on OC Consolidation From Agam, Bukit Tinggi & Padang Panjang to Padang Tranport From Padang Pariaman & Pariaman to Padang Tranport From Lima Puluh Kota & Payakumbuh to Padang Tranport From Solok, Sawah Lunto & Sijunjung to Padang Tranport
INVOICE SAAT INI
Jumlah
6 18
18 36 18 18
1.500.000 100.000 100.000 300.000
2.3.1.6 FOR SEVERAL TRA. & SPE. EVENT FROM KAB. TO PADANG
b
Rate
trip m/d
2.4.1.5 FROM PROVINCE TO REGIONAL FOR WORKSHOP & COORDINATION MEETING AT OC
a
INVOICE LALU Vol
9.000.000
2.3.1.4 FROM KAB/KOTA TO TL OFFICE FOR COORDIANTION MEETING a From Agam, Bukit Tinggi & Padang Panjang to Padang Tranport Acomodation OSA b From Padang Pariaman & Pariaman to Padang Tranport Acomodation OSA c From Lima Puluh Kota & Payakumbuh to Padang Tranport Acomodation OSA d From Solok, Sawah Lunto & Sijunjung to Padang Tranport Acomodation OSA
Workshop OC / Coordination Meeting at OC From Padang to Medan Air Transport OSA [ Fixed ] Local Transport Accomodation
Jumlah
37.800.000
27.000.000 3.600.000 1.800.000 5.400.000
8.271.400
6 12 3
1.500.000 100.000 100.000 300.000
348.600.000
-
6.171.400 1.200.000 900.000
1.500.000 100.000 100.000 300.000
33.155.000
-
8.271.400
6 12 3
1.500.000 100.000 100.000 300.000
2.075.000
6.171.400 1.200.000 900.000
29.528.600
12 24 18 15
1.500.000 100.000 100.000 300.000
35.230.000
20.828.600 2.400.000 1.800.000 4.500.000 313.370.000
trip
24
200.000
4.800.000
-
200.000
-
5
200.000
550.000
5
200.000
550.000
19
200.000
4.250.000
trip
16
150.000
2.400.000
-
150.000
-
4
150.000
300.000
4
150.000
300.000
12
150.000
2.100.000
trip
16
250.000
4.000.000
-
250.000
-
4
250.000
600.000
4
250.000
600.000
12
250.000
3.400.000
300.000
II.5 // 29 of 50 6.575.000
trip
24
300.000
7.200.000
-
300.000
-
5
300.000
625.000
5
300.000
625.000
19
NO
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
a b c d
Inland Transport for SF, FK, FE, FS (11 Kota/Kab) From Agam, Bukit Tinggi & Padang Panjang to Padang Tranport From Padang Pariaman & Pariaman to Padang Tranport From Lima Puluh Kota & Payakumbuh to Padang Tranport From Solok, Sawah Lunto & Sijunjung to Padang Tranport
Rate
INVOICE LALU
Jumlah
Vol
Rate
INVOICE SAAT INI
Jumlah
Vol
Rate
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
SISA KONTRAK
Jumlah
Vol
Rate
Jumlah
trip
29
200.000
5.800.000
-
200.000
-
200.000
-
-
200.000
-
29
200.000
5.800.000
trip
45
150.000
6.750.000
-
150.000
-
150.000
-
-
150.000
-
45
150.000
6.750.000
trip
45
250.000
11.250.000
-
250.000
-
250.000
-
-
250.000
-
45
250.000
11.250.000
trip
31
300.000
9.300.000
-
300.000
-
300.000
-
-
300.000
-
31
300.000
9.300.000
Special Event (by request) From Agam, Bukit Tinggi & Padang Panjang to Padang Tranport Acomodation OSA
trip m/d m/d
-
200.000 300.000 50.000
-
-
200.000 300.000 50.000
-
200.000 300.000 50.000
-
-
200.000 300.000 50.000
-
-
200.000 300.000 50.000
-
From Padang Pariaman & Pariaman to Padang Tranport Acomodation OSA
trip m/d m/d
-
150.000 300.000 50.000
-
-
150.000 300.000 50.000
-
150.000 300.000 50.000
-
-
150.000 300.000 50.000
-
-
150.000 300.000 50.000
-
From Lima Puluh Kota & Payakumbuh to Padang Tranport Acomodation OSA
trip m/d m/d
-
250.000 300.000 50.000
-
-
250.000 300.000 50.000
-
250.000 300.000 50.000
-
-
250.000 300.000 50.000
-
-
250.000 300.000 50.000
-
From Solok, Sawah Lunto & Sijunjung to Padang Tranport Acomodation OSA
trip m/d m/d
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
BRIDGING (July 2014 to April 2015) 1. Konsolidasi Pemandu Pelatihan Penguatan Pemda dan Stakeholder a. Tranport From Kab to Padang - Agam, Bukit Tinggi & Padang Panjang trip - Padang Pariaman & Pariaman trip - Lima Puluh Kota & Payakumbuh trip - Solok, Sawah Lunto & Sijunjung trip
-
200.000 150.000 250.000 300.000
-
-
200.000 150.000 250.000 300.000
-
200.000 150.000 250.000 300.000
-
-
200.000 150.000 250.000 300.000
-
-
200.000 150.000 250.000 300.000
-
2. Pelatihan Penguatan Pemda dan Stakeholder a. Tranport From Kab to Padang - Agam, Bukit Tinggi & Padang Panjang - Padang Pariaman & Pariaman - Lima Puluh Kota & Payakumbuh - Solok, Sawah Lunto & Sijunjung
trip trip trip trip
-
200.000 150.000 250.000 300.000
-
-
200.000 150.000 250.000 300.000
-
200.000 150.000 250.000 300.000
-
-
200.000 150.000 250.000 300.000
-
-
200.000 150.000 250.000 300.000
-
3. Konsolidasi Pemandu Pelatihan Penguatan Askot dan Fasilitator a. Tranport From Kab to Padang - Agam, Bukit Tinggi & Padang Panjang - Padang Pariaman & Pariaman - Lima Puluh Kota & Payakumbuh - Solok, Sawah Lunto & Sijunjung
trip trip trip trip
-
200.000 150.000 250.000 300.000
-
-
200.000 150.000 250.000 300.000
-
200.000 150.000 250.000 300.000
-
-
200.000 150.000 250.000 300.000
-
-
200.000 150.000 250.000 300.000
-
4. Pelatihan Penguatan Askot dan Fasilitator a. Tranport From Kab to Padang - Agam, Bukit Tinggi & Padang Panjang
trip
-
200.000
-
-
200.000
-
200.000
-
-
200.000
-
-
200.000
II.5 // 30 of 50
NO
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
INVOICE LALU
Jumlah
Vol
Rate
INVOICE SAAT INI
Jumlah
Vol
Rate
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
SISA KONTRAK
Jumlah
Vol
Rate
Jumlah
- Padang Pariaman & Pariaman - Lima Puluh Kota & Payakumbuh - Solok, Sawah Lunto & Sijunjung
trip trip trip
-
150.000 250.000 300.000
-
-
150.000 250.000 300.000
-
150.000 250.000 300.000
-
-
150.000 250.000 300.000
-
-
150.000 250.000 300.000
-
5. Konsolidasi Pemandu Pelatihan PLPBK a. Tranport From Kab to Padang - Agam, Bukit Tinggi & Padang Panjang - Padang Pariaman & Pariaman - Lima Puluh Kota & Payakumbuh - Solok, Sawah Lunto & Sijunjung
trip trip trip trip
-
200.000 150.000 250.000 300.000
-
-
200.000 150.000 250.000 300.000
-
200.000 150.000 250.000 300.000
-
-
200.000 150.000 250.000 300.000
-
-
200.000 150.000 250.000 300.000
-
6. Pelatihan Dasar PLBPK a. Tranport From Kab to Padang - Agam, Bukit Tinggi & Padang Panjang - Padang Pariaman & Pariaman - Lima Puluh Kota & Payakumbuh - Solok, Sawah Lunto & Sijunjung
trip trip trip trip
10 23 23 8
200.000 150.000 250.000 300.000
2.000.000 3.450.000 5.750.000 2.400.000
-
200.000 150.000 250.000 300.000
-
200.000 150.000 250.000 300.000
-
-
200.000 150.000 250.000 300.000
-
10 23 23 8
200.000 150.000 250.000 300.000
2.000.000 3.450.000 5.750.000 2.400.000
7. Pelatihan Penguatan PLPBK a. Tranport From Kab to Padang - Agam, Bukit Tinggi & Padang Panjang - Padang Pariaman & Pariaman - Lima Puluh Kota & Payakumbuh - Solok, Sawah Lunto & Sijunjung
trip trip trip trip
-
200.000 150.000 250.000 300.000
-
-
200.000 150.000 250.000 300.000
-
200.000 150.000 250.000 300.000
-
-
200.000 150.000 250.000 300.000
-
-
200.000 150.000 250.000 300.000
-
8. Pelatihan Tim Teknis PLPBK a. Tranport From Kab to Padang - Agam, Bukit Tinggi & Padang Panjang - Padang Pariaman & Pariaman - Lima Puluh Kota & Payakumbuh - Solok, Sawah Lunto & Sijunjung
trip trip trip trip
7 6 6 7
200.000 150.000 250.000 300.000
1.400.000 900.000 1.500.000 2.100.000
-
200.000 150.000 250.000 300.000
-
200.000 150.000 250.000 300.000
-
-
200.000 150.000 250.000 300.000
-
7 6 6 7
200.000 150.000 250.000 300.000
1.400.000 900.000 1.500.000 2.100.000
9. Orientasi and Planning Training for Livelihood/PPMK (New Location FY 2014) a. Tranport From Kab to Padang trip 287
250.000
60.350.000
185
250.000
16.175.000
250.000
-
185
250.000
16.175.000
102
250.000
44.175.000
10. Advance Training for Livelihood/PPMK (Location FY 2012) and (Location 2014) a. Tranport From Kab to Padang trip 291
250.000
72.750.000
-
250.000
-
250.000
-
-
250.000
-
291
250.000
72.750.000
BRIDGING (Mei to Desember 2015) 1. Konsolidasi Pemandu Pelatihan Pemerintah Daerah a. Tranport From Kab to Padang
trip
18
250.000
4.500.000
-
250.000
-
250.000
-
-
250.000
-
18
250.000
4.500.000
2. Pelatihan Pemerintah Daerah a. Tranport From Kab to Padang
trip
55
250.000
13.750.000
-
250.000
-
250.000
-
-
250.000
-
55
250.000
13.750.000
3. Konsolidasi Pemandu Pelatihan Penguatan Program Lanjutan a. Tranport From Kab to Padang
trip
15
250.000
3.750.000
-
250.000
-
250.000
-
-
250.000
-
15
250.000
3.750.000
4. Pelatihan Penguatan Program Lanjutan a. Tranport From Kab to Padang
trip
271
250.000
67.750.000
179
250.000
16.980.000
250.000
-
179
250.000
16.980.000
92
250.000
50.770.000
5. Pelatihan Penguatan PLPBK a. Tranport From Kab to Padang
trip
61
250.000
15.250.000
-
250.000
-
250.000
-
-
250.000
-
61
250.000
15.250.000
6. Pelatihan Tim Teknis PLPBK (Sumbar) a. Tranport From Kab to Padang
trip
55
250.000
13.750.000
-
250.000
-
250.000
-
-
250.000
-
55
250.000
13.750.000 II.5 // 31 of 50
NO
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Jumlah
INVOICE LALU Vol
Rate
INVOICE SAAT INI
Jumlah
Vol
Rate
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
SISA KONTRAK
Jumlah
Vol
Rate
Jumlah
93
250.000
23.250.000
-
10
250.000
2.500.000
250.000
-
51
250.000
12.750.000
-
250.000
-
61
250.000
15.250.000
43 53 401 56
1.800.000 200.000 100.000 350.000
134.792.100 67.392.100 10.500.000 40.100.000 16.800.000
10 12 60 262
1.800.000 200.000 100.000 350.000
118.795.200 19.495.200 1.600.000 6.000.000 91.700.000
7. Pelatihan Penguatan PPMK a. Tranport From Kab to Padang
trip
93
250.000
23.250.000
-
250.000
-
250.000
-
-
250.000
-
8. Pelatihan SIM a. Tranport From Kab to Padang
trip
10
250.000
2.500.000
-
250.000
-
250.000
-
-
250.000
9. Pelatihan Khusus Askot MK dan Faskel Ekonomi a. Tranport From Kab to Padang
trip
51
250.000
12.750.000
-
250.000
-
250.000
-
-
10. Pelatihan Aplikasi Pembukuan UPK (Computerize System) a. Tranport From Kab to Padang
trip
61
250.000
15.250.000
-
250.000
-
250.000
-
trip trip trip
53 65 461
1.800.000 200.000 100.000
253.587.300 86.887.300 12.100.000 46.100.000
trip
318
350.000
108.500.000
43 53 401 56
1.800.000 200.000 100.000 350.000
134.792.100 67.392.100 10.500.000 40.100.000 16.800.000
1.800.000 200.000 100.000 350.000
-
2.3.2 TO JAKARTA 2.3.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST Air Transport In land Travel in Jakarta OSA Hotel Accommodation 2.3.2.2 FOR EGM TO JAKARTA Air Transport EGM TA/SubTA Training EGM TA Sosialisasi EGM TA/SubTA MK/Sub TA RLF EGM TA/SubTA INFRA/Sub TA Safeguard EGM TA/SubTA Monev /Sub TA Legal HCU EGM TA/SubTA SIM EGM TA Local Goverment EGM TA Livelihood & SME's EGM TA Urban Planner
258.198.800
58.443.800
-
58.443.800
199.755.000
trip trip trip trip trip trip trip trip trip
7 7 13 7 13 7 7 7 7
1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000
10.725.700 11.765.700 21.945.200 11.145.200 20.647.200 11.765.700 10.693.200 10.571.700 10.539.200
3 2 3 3 4 2 3 3 3
1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000
3.130.700 2.370.700 3.550.200 3.550.200 4.052.200 2.370.700 3.098.200 2.976.700 2.944.200
1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000
-
3 2 3 3 4 2 3 3 3
1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000
3.130.700 2.370.700 3.550.200 3.550.200 4.052.200 2.370.700 3.098.200 2.976.700 2.944.200
4 5 10 4 9 5 4 4 4
1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000
7.595.000 9.395.000 18.395.000 7.595.000 16.595.000 9.395.000 7.595.000 7.595.000 7.595.000
trip m/d trip
75 348 261
200.000 100.000 350.000
13.600.000 34.800.000 90.000.000
26 104 54
200.000 100.000 350.000
3.800.000 10.400.000 16.200.000
200.000 100.000 350.000
-
26 104 54
200.000 100.000 350.000
3.800.000 10.400.000 16.200.000
49 244 207
200.000 100.000 350.000
9.800.000 24.400.000 73.800.000
trip trip m/d m/d
13 13 52 39
1.800.000 200.000 100.000 350.000
44.850.000 23.400.000 2.600.000 5.200.000 13.650.000
2 1 8 6
1.800.000 200.000 100.000 350.000
5.412.000 2.612.000 200.000 800.000 1.800.000
1.800.000 200.000 100.000 350.000
-
2 1 8 6
1.800.000 200.000 100.000 350.000
5.412.000 2.612.000 200.000 800.000 1.800.000
11 12 44 33
1.800.000 200.000 100.000 350.000
39.438.000 20.788.000 2.400.000 4.400.000 11.850.000
2.3.2.4 FROM PROVINCE (KMW SUMBAR) TO OTHER PROVINCE (by request) Air Transport trip In land Transport in Jakarta trip Hotel Accommodation m/d OSA m/d
5 5 15 20
4.000.000 300.000 350.000 100.000
28.750.000 20.000.000 1.500.000 5.250.000 2.000.000
3 2 9
4.000.000 300.000 350.000 100.000
8.452.400 7.152.400 400.000 900.000
4.000.000 300.000 350.000 100.000
-
3 2 9
4.000.000 300.000 350.000 100.000
8.452.400 7.152.400 400.000 900.000
2 3 15 11
4.000.000 300.000 350.000 100.000
20.297.600 12.847.600 1.100.000 5.250.000 1.100.000
In land Transport in Jakarta OSA Hotel Accommodation 2.3.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) Air Transport In land Transport in Jakarta OSA Hotel Accommodation
TOTAL DUTY TRAVEL PROVINCE SUMATERA BARAT
1.400.536.100
287.685.700
2.075.000
289.760.700
1.110.775.400
II.5 // 32 of 50
II DIRECT REEIMBURSABLE COST 2.6. DUTY TRAVEL EXPENSES PROVINCE RIAU NO
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
2.4.1 IN PROVINCE 2.4.1.1 FOR SPOTCHECK PROVINCE TO KELURAHAN (3 % x No. of Kelurah a From Pekanbaru to Bengkalis (15 kel x 3% = 6 kel) Sea Transport Tranport Acomodation Lumpsum b From Pekanbaru to Dumai (32 kel x 3% = 13 kel) Tranport Several transport to Dumai (Remote Village) Acomodation Lumpsum c From Pekanbaru to Kuantan Singingi & Indragiri Hilir (19 kel x 3% = 9 kel) Tranport Several transport to Kuansing & Indragiri Hilir (Remote Village) Acomodation Lumpsum d From Pekanbaru to Pekanbaru (58 kel x 3% = 23 kel) Lumpsum
Rate
2
3
INVOICE LALU Vol
Rate
62.700.000
INVOICE SAAT INI
Jumlah
Vol
Rate
28.866.870
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
-
SISA KONTRAK
Jumlah
Vol
Rate
28.866.870
Jumlah 33.833.130
trip trip m/d m/d
12 12 24 36
350.000 200.000 300.000 50.000
4.200.000 2.400.000 7.200.000 1.800.000
7 13 22
350.000 200.000 300.000 50.000
1.420.000 3.820.000 1.100.000
-
350.000 200.000 300.000 50.000
-
7 13 22
350.000 200.000 300.000 50.000
1.420.000 3.820.000 1.100.000
12 5 11 14
350.000 200.000 300.000 50.000
4.200.000 980.000 3.380.000 700.000
trip trip m/d m/d
18 6 36 54
300.000 300.000 300.000 50.000
5.400.000 1.800.000 10.800.000 2.700.000
11 20 33
300.000 300.000 300.000 50.000
3.295.000 5.820.000 1.650.000
-
300.000 300.000 300.000 50.000
-
11 20 33
300.000 300.000 300.000 50.000
3.295.000 5.820.000 1.650.000
7 6 16 21
300.000 300.000 300.000 50.000
2.105.000 1.800.000 4.980.000 1.050.000
trip trip m/d m/d
12 12 36 48
400.000 400.000 300.000 50.000
4.800.000 4.800.000 10.800.000 2.400.000
12 22 38
400.000 400.000 300.000 50.000
3.830.870 5.881.000 1.900.000
-
400.000 400.000 300.000 50.000
-
12 22 38
400.000 400.000 300.000 50.000
3.830.870 5.881.000 1.900.000
12 14 10
400.000 400.000 300.000 50.000
969.130 4.800.000 4.919.000 500.000
m/d
72
50.000
3.600.000
3
50.000
150.000
-
50.000
-
3
50.000
150.000
69
50.000
3.450.000
2.4.1.2 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM
1
Jumlah
95.850.000
11.310.000
-
11.310.000
84.540.000
A. For City Coordinator and Assistance City Coordinator (124 Kel x 50%) x 4 Cost / Day Rp. 50.000.- 1 Day cover 2 kel
trip
186
50.000
9.300.000
46
50.000
2.300.000
-
50.000
-
46
50.000
2.300.000
140
50.000
7.000.000
B. For Ass. City Coordinator Infrastructure and FM in the city (124 Kel - 34 Kel luar kota) x 50%) x 14 Cost / Day Rp. 50.000.- 1 Day cover 2 kel
trip
299
50.000
14.950.000
74
50.000
3.700.000
-
50.000
-
74
50.000
3.700.000
225
50.000
11.250.000
trip trip m/d trip
36 36 36 72
350.000 200.000 300.000 50.000
12.600.000 7.200.000 10.800.000 3.600.000
3 3 5
350.000 200.000 300.000 50.000
650.000 750.000 250.000
-
350.000 200.000 300.000 50.000
-
3 3 5
350.000 200.000 300.000 50.000
650.000 750.000 250.000
36 33 33 67
350.000 200.000 300.000 50.000
12.600.000 6.550.000 10.050.000 3.350.000
trip m/d trip
34 34 68
300.000 300.000 50.000
10.200.000 10.200.000 3.400.000
1 2 4
300.000 300.000 50.000
300.000 585.000 200.000
-
300.000 300.000 50.000
-
1 2 4
300.000 300.000 50.000
300.000 585.000 200.000
33 32 64
300.000 300.000 50.000
9.900.000 9.615.000 3.200.000
trip m/d trip
17 17 34
400.000 300.000 50.000
6.800.000 5.100.000 1.700.000
4 4 10
400.000 300.000 50.000
1.000.000 1.075.000 500.000
-
400.000 300.000 50.000
-
4 4 10
400.000 300.000 50.000
1.000.000 1.075.000 500.000
13 13 24
400.000 300.000 50.000
5.800.000 4.025.000 1.200.000
C. For City Coordinator Infrastructure and FM out of te town From Pekanbaru to Bengkalis From Dumai to Bengkalis Sea Transport Tranport Acomodation Lumpsum From Pekanbaru to Kuantan Singingi Tranport Acomodation Lumpsum From Pekanbaru to Indragiri Hilir Tranport Acomodation Lumpsum
2.4.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL a From Pekanbaru to Bengkalis Sea Transport Tranport Acomodation Lumpsum b From Pekanbaru to Kuantan Singingi Tranport Acomodation Lumpsum
21.000.000
-
-
21.000.000
trip trip m/d m/d
6 6 12 18
350.000 200.000 300.000 50.000
2.100.000 1.200.000 3.600.000 900.000
-
350.000 200.000 300.000 50.000
-
-
350.000 200.000 300.000 50.000
-
-
350.000 200.000 300.000 50.000
-
6 6 12 18
350.000 200.000 300.000 50.000
2.100.000 1.200.000 3.600.000 900.000
trip m/d m/d
6 12 18
300.000 300.000 50.000
1.800.000 3.600.000 900.000
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
6 12 18
300.000 300.000 50.000
1.800.000 3.600.000 900.000 II.6 // 33 of 50
NO
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
c
From Pekanbaru to Indragiri Hilir Tranport Acomodation Lumpsum
2.4.1.4 FROM KAB/KOTA TO TL OFFICE FOR COORDIANTION MEETING a From Bengkalis to Pekanbaru Sea Transport Tranport Acomodation OSA b From Dumai to Pekanbaru Tranport Acomodation OSA c From Kuantan Singingi & Indragiri Hilir to Pekanbaru Tranport Acomodation OSA
trip m/d m/d
Rate
6 12 18
400.000 300.000 50.000
2 3
1
2 3
b 1
2
Special Event (by request) From Bengkalis to Pekanbaru Sea Transport Tranport Acomodation OSA From Dumai to Pekanbaru Tranport Acomodation OSA
-
400.000 300.000 50.000
INVOICE SAAT INI
Jumlah
Vol -
Rate -
400.000 300.000 50.000
2.502.000
INVOICE S/D SAAT INI
Jumlah
Vol -
Rate -
400.000 300.000 50.000
-
SISA KONTRAK
Jumlah
Vol -
Rate
6 12 18
400.000 300.000 50.000
2.502.000
Jumlah 2.400.000 3.600.000 900.000 71.898.000
16 16 32 48
350.000 200.000 300.000 50.000
5.600.000 3.200.000 9.600.000 2.400.000
1 1 2
350.000 200.000 300.000 50.000
200.000 298.000 100.000
-
350.000 200.000 300.000 50.000
-
1 1 2
350.000 200.000 300.000 50.000
200.000 298.000 100.000
16 15 31 46
350.000 200.000 300.000 50.000
5.600.000 3.000.000 9.302.000 2.300.000
trip m/d m/d
16 32 48
300.000 300.000 50.000
4.800.000 9.600.000 2.400.000
1 1 2
300.000 300.000 50.000
200.000 298.000 100.000
-
300.000 300.000 50.000
-
1 1 2
300.000 300.000 50.000
200.000 298.000 100.000
15 31 46
300.000 300.000 50.000
4.600.000 9.302.000 2.300.000
trip m/d m/d
32 64 96
400.000 300.000 50.000
12.800.000 19.200.000 4.800.000
2 2 4
400.000 300.000 50.000
510.000 596.000 200.000
-
400.000 300.000 50.000
-
2 2 4
400.000 300.000 50.000
510.000 596.000 200.000
30 62 92
400.000 300.000 50.000
12.290.000 18.604.000 4.600.000
Trip Man/Days Trip Man/Days
For Training Inlandtransport for Korkot &Askot (5 Kota/Kab) on OSP Consolidation From Bengkalis to Pekabaru Sea Transport trip Tranport trip From Dumai to Pekanbaru Tranport trip From Kuntan Singingi & Indragiri Hilir to Pekanbaru Tranport trip Inland Transport for SF, FK, FE, FS (5 Kota/Kab) From Bengkalis to Pekanbaru Sea Transport Tranport From Dumai to Pekanbaru Tranport From Kuantan Singingi & Indragiri Hilir to Pekanbaru Tranport
2.400.000 3.600.000 900.000
Rate
trip trip m/d m/d
18 36 18 18
37.800.000
1.500.000 100.000 100.000 300.000
2.4.1.6 FOR SEVERAL TRAINING & SPECIAL EVENT FROM KAB. TO PEKANBARU
1
Vol
74.400.000
2.4.1.5 FROM PROVINCE TO REGIONAL FOR WORKSHOP & COORDINATION MEETING AT OC Workshop OC / Coordination Meeting at OC From Pekanbaru to Medan Air Transport OSA [ Fixed ] Local Transport Accomodation
INVOICE LALU
Jumlah
27.000.000 3.600.000 1.800.000 5.400.000
10.665.100
10 20 3
1.500.000 100.000 100.000 300.000
177.100.000
7.765.100 2.000.000 900.000
-
-
1.500.000 100.000 100.000 300.000
11.640.000
-
10.665.100
10 20 3
1.500.000 100.000 100.000 300.000
1.710.000
7.765.100 2.000.000 900.000
27.134.900
8 16 18 15
1.500.000 100.000 100.000 300.000
13.350.000
19.234.900 1.600.000 1.800.000 4.500.000 163.750.000
6 6
350.000 200.000
2.100.000 1.200.000
-
350.000 200.000
-
1
350.000 200.000
200.000
1
350.000 200.000
200.000
6 5
350.000 200.000
2.100.000 1.000.000
13
300.000
3.900.000
6
300.000
1.940.000
5
300.000
1.100.000
11
300.000
3.040.000
2
300.000
860.000
12
400.000
4.800.000
2
400.000
410.000
2
400.000
410.000
4
400.000
820.000
8
400.000
3.980.000
trip trip
9 9
350.000 200.000
3.150.000 1.800.000
-
350.000 200.000
-
-
350.000 200.000
-
-
350.000 200.000
-
9 9
350.000 200.000
3.150.000 1.800.000
trip
19
300.000
5.700.000
-
300.000
-
-
300.000
-
-
300.000
-
19
300.000
5.700.000
trip
10
400.000
4.000.000
-
400.000
-
-
400.000
-
-
400.000
-
10
400.000
4.000.000
trip trip m/d m/d
-
350.000 200.000 300.000 50.000
-
-
350.000 200.000 300.000 50.000
-
-
350.000 200.000 300.000 50.000
-
-
350.000 200.000 300.000 50.000
-
-
350.000 200.000 300.000 50.000
-
trip m/d m/d
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
-
-
300.000 300.000 50.000
II.6 // 34 of 50
NO
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
3
Rate
INVOICE LALU
Jumlah
Vol
Rate
INVOICE SAAT INI
Jumlah
Vol
Rate
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
SISA KONTRAK
Jumlah
Vol
Rate
Jumlah
From Kuantan Singingi & Indragiri Hilir to Pekanbaru Tranport Acomodation OSA
trip m/d m/d
-
400.000 300.000 50.000
-
-
400.000 300.000 50.000
-
-
400.000 300.000 50.000
-
-
400.000 300.000 50.000
-
-
400.000 300.000 50.000
-
BRIDGING (July 2014 to April 2015) 1. Konsolidasi Pemandu Pelatihan Penguatan Pemda dan Stakeholder a. Tranport From Kab to Pekanbaru - Bengkalis - Dumai - Kuantan Singingi & Indragiri Hilir b. OSA
trip trip trip m/d
-
550.000 300.000 400.000 50.000
-
-
550.000 300.000 400.000 50.000
-
-
550.000 300.000 400.000 50.000
-
-
550.000 300.000 400.000 50.000
-
-
550.000 300.000 400.000 50.000
-
2. Pelatihan Penguatan Pemda dan Stakeholder a. Tranport From Kab to Pekanbaru - Bengkalis - Dumai - Kuantan Singingi & Indragiri Hilir
trip trip trip
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
3. Konsolidasi Pemandu Pelatihan Penguatan Askot dan Fasilitator a. Tranport From Kab to Pekanbaru - Bengkalis - Dumai - Kuantan Singingi & Indragiri Hilir
trip trip trip
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
4. Pelatihan Penguatan Askot dan Fasilitator a. Tranport From Kab to Pekanbaru - Bengkalis - Dumai - Kuantan Singingi & Indragiri Hilir
trip trip trip
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
5. Konsolidasi Pemandu Pelatihan PLPBK a. Tranport From Kab to Pekanbaru - Bengkalis - Dumai - Kuantan Singingi & Indragiri Hilir
trip trip trip
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
6. Pelatihan Dasar PLBPK a. Tranport From Kab to Pekanbaru - Bengkalis - Dumai - Kuantan Singingi & Indragiri Hilir
trip trip trip
1 1 2
550.000 300.000 400.000
550.000 300.000 800.000
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
1 1 2
550.000 300.000 400.000
550.000 300.000 800.000
7. Pelatihan Penguatan PLPBK a. Tranport From Kab to Pekanbaru - Bengkalis - Dumai - Kuantan Singingi & Indragiri Hilir
trip trip trip
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
-
550.000 300.000 400.000
-
75
400.000
30.000.000
-
400.000
-
-
400.000
-
-
400.000
-
75
400.000
30.000.000
10. Advance Training for Livelihood/PPMK (Location FY 2012) and (Location 2014) a. Tranport From Kab to Pekanbaru trip 99
400.000
39.600.000
-
400.000
-
-
400.000
-
-
400.000
-
99
400.000
39.600.000
BRIDGING (Mei to Desember 2015) 1. Konsolidasi Pemandu Pelatihan Pemerintah Daerah a. Tranport From Kab to Pekanbaru
400.000
2.800.000
-
400.000
-
-
400.000
-
-
400.000
-
7
400.000
9. Orientasi and Planning Training for Livelihood/PPMK (New Location FY 2014) a. Tranport From Kab to Pekanbaru trip
trip
7
2.800.000 II.6 // 35 of 50
NO
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Jumlah
INVOICE LALU Vol
Rate
INVOICE SAAT INI
Jumlah
Vol
Rate
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
SISA KONTRAK
Jumlah
Vol
Rate
Jumlah
30
400.000
12.000.000
-
5
400.000
2.000.000
400.000
9.290.000
50
400.000
29.110.000
-
400.000
-
21
400.000
8.400.000
-
-
400.000
-
36
400.000
14.400.000
400.000
-
-
400.000
-
3
400.000
1.200.000
-
400.000
-
-
400.000
-
20
400.000
8.000.000
-
400.000
-
-
400.000
-
23
400.000
9.200.000
1.800.000 200.000 100.000 350.000
-
26 26 222 32
1.800.000 200.000 100.000 350.000
80.249.200 43.249.200 5.200.000 22.200.000 9.600.000
27 27 149 286
1.800.000 200.000 100.000 350.000
141.738.800 40.138.800 4.080.000 14.900.000 82.620.000
2. Pelatihan Pemerintah Daerah a. Tranport From Kab to Pekanbaru
trip
30
400.000
12.000.000
-
400.000
-
-
400.000
-
-
400.000
-
3. Konsolidasi Pemandu Pelatihan Penguatan Program Lanjutan a. Tranport From Kab to Pekanbaru
trip
5
400.000
2.000.000
-
400.000
-
-
400.000
-
-
400.000
4. Pelatihan Penguatan Program Lanjutan a. Tranport From Kab to Pekanbaru
trip
96
400.000
38.400.000
46
400.000
9.290.000
400.000
-
46
5. Pelatihan Penguatan PLPBK a. Tranport From Kab to Pekanbaru
trip
21
400.000
8.400.000
-
400.000
-
-
400.000
-
6. Pelatihan Penguatan PPMK a. Tranport From Kab to Pekanbaru
trip
36
400.000
14.400.000
-
400.000
-
-
400.000
7. Pelatihan SIM a. Tranport From Kab to Pekanbaru
trip
3
400.000
1.200.000
-
400.000
-
-
8. Pelatihan Khusus Askot MK dan Faskel Ekonomi a. Tranport From Kab to Pekanbaru
trip
20
400.000
8.000.000
-
400.000
-
9. Pelatihan Aplikasi Pembukuan UPK (Computerize System) a. Tranport From Kab to Pekanbaru
trip
23
400.000
9.200.000
-
400.000
-
trip trip trip
53 53 371
1.800.000 200.000 100.000
221.988.000 83.388.000 9.280.000 37.100.000
trip
318
350.000
92.220.000
26 26 222 32
1.800.000 200.000 100.000 350.000
80.249.200 43.249.200 5.200.000 22.200.000 9.600.000
2.4.2 TO JAKARTA 2.4.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST Air Transport In land Travel in Jakarta OSA Hotel Accommodation 2.4.2.2 FOR EGM TO JAKARTA Air Transport EGM TA/SubTA Training EGM TA Sosialisasi EGM TA/SubTA MK/Sub TA RLF EGM TA/SubTA INFRA/Sub TA Safeguard EGM TA/SubTA Monev /Sub TA Legal HCU EGM TA/SubTA SIM EGM TA Local Goverment EGM TA Livelihood & SME's EGM TA Urban Planner
161.533.720
52.908.600
-
52.908.600
108.625.120
trip trip trip trip trip trip trip trip trip
7 7 7 7 7 7 7 7 -
1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000
9.763.140 9.711.440 9.833.540 9.866.340 10.747.740 9.881.740 9.746.640 9.763.140 -
2 2 2 2 2 2 2 1 -
1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000
3.052.700 2.794.200 3.411.700 5.005.700 2.975.700 3.645.700 4.407.200 1.615.700 -
1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000
-
2 2 2 2 2 2 2 1 -
1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000
3.052.700 2.794.200 3.411.700 5.005.700 2.975.700 3.645.700 4.407.200 1.615.700 -
5 5 5 5 5 5 5 6 -
1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000 1.800.000
6.710.440 6.917.240 6.421.840 4.860.640 7.772.040 6.236.040 5.339.440 8.147.440 -
trip m/d
56 224
200.000 100.000
9.660.000 22.400.000
trip
168
350.000
50.160.000
17 92 39
200.000 100.000 350.000
3.300.000 9.200.000 13.500.000
200.000 100.000 350.000
-
17 92 39
200.000 100.000 350.000
3.300.000 9.200.000 13.500.000
40 132 129
200.000 100.000 350.000
6.360.000 13.200.000 36.660.000
2.4.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) Air Transport In land Transport in Jakarta OSA Hotel Accommodation
trip trip m/d m/d
13 13 52 39
1.800.000 200.000 100.000 350.000
44.850.000 23.400.000 2.600.000 5.200.000 13.650.000
3 2 12 6
1.800.000 200.000 100.000 350.000
5.957.500 2.757.500 200.000 1.200.000 1.800.000
1.800.000 200.000 100.000 350.000
-
3 2 12 6
1.800.000 200.000 100.000 350.000
5.957.500 2.757.500 200.000 1.200.000 1.800.000
10 11 40 33
1.800.000 200.000 100.000 350.000
38.892.500 20.642.500 2.400.000 4.000.000 11.850.000
2.4.2.4 FROM PROVINCE (KMW RIAU) TO OTHER PROVINCE (by request) Air Transport In land Transport in Jakarta Hotel Accommodation OSA
trip trip m/d m/d
5 5 15 20
4.000.000 300.000 350.000 100.000
28.750.000 20.000.000 1.500.000 5.250.000 2.000.000
2 2 9
4.000.000 300.000 350.000 100.000
9.318.900 8.018.900 400.000 900.000
4.000.000 300.000 350.000 100.000
-
2 2 9
4.000.000 300.000 350.000 100.000
9.318.900 8.018.900 400.000 900.000
3 3 15 11
4.000.000 300.000 350.000 100.000
In land Transport in Jakarta OSA Hotel Accommodation
TOTAL DUTY TRAVEL PROVINCE RIAU
925.971.720
213.418.170
-
1.710.000
215.128.170
19.431.100 11.981.100 1.100.000 5.250.000 1.100.000 II.6 // 36 of 50 710.843.550
II DIRECT REEIMBURSABLE COST 2.7. DUTY TRAVEL EXPENSES PROVINCE KEP. RIAU NO
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
2.5.1 IN PROVINCE 2.5.1.1 FOR SPOTCHECK PROVINCE TO KELURAHAN (3 % x Number of Kelurahan) a From Tanjung Pinang to Bintan (5 kel x 3% = 3 kel) Lumpsum m/d 22 b From Tanung Pinang to Batam (64 kel x 3% = 29 kel) Sea Transport trip 30 Tranport trip 30 Acomodation m/d 90 Lumpsum m/d 120 c From Tanjung Pinang to Karimun (22 kel x 3% = 10 kel) Sea Transport trip 20 Tranport trip 20 Acomodation m/d 40 Lumpsum m/d 60 d From Tanjung Pinang to Tanjung Pinang (18 kel x 3% = 10 kel) Lumpsum m/d 34
Rate
B. For Ass. City Coordinator Infrastructure and FM in the city ((109 Kel - 23 Kel luar kota) x 50%) x 14 Cost / Day Rp. 50.000.- 1 Day cover 2 kel Various Transport (21 kel x 50%) x 14
1
2
C. For City Coordinator Infrastructure and FM out of te town From Batam to Bintan Sea Transport Transport Lumpsum From Batam to Tanjung Pinang Sea Transport Transport Lumpsum
2.5.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL a From Batam to Bintan Sea Transport Tranport Lumpsum b From Batam to Tanjung Pinang Sea Transport Tranport Lumpsum 2.5.1.4 FROM KAB/KOTA TO TL OFFICE FOR COORDIANTION MEETING a From Bintan to Tanjung Pinang Tranport Acomodation OSA
INVOICE LALU Vol
Rate
75.800.000
INVOICE SAAT INI
Jumlah
Vol
Rate
35.268.500
50.000
1.100.000
14
50.000
700.000
400.000 100.000 300.000 50.000
12.000.000 3.000.000 27.000.000 6.000.000
12 15 45 60
400.000 100.000 300.000 50.000
1.498.000 1.400.000 13.500.000 3.000.000
400.000 100.000 300.000 50.000
8.000.000 2.000.000 12.000.000 3.000.000
12 13 27 41
400.000 100.000 300.000 50.000
3.360.500 1.270.000 7.790.000 2.050.000
50.000
1.700.000
14
50.000
700.000
2.5.1.2 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM A. For City Coordinator and Assistance City Coordinator (109 Kel x 50%) x 4 Cost / Day Rp. 50.000.- 1 Day cover 2 kel Various Transport (21 kel x 50%) x 4
Jumlah
113.450.000
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
-
SISA KONTRAK
Jumlah
Vol
Rate
35.268.500
Jumlah 40.531.500
50.000
-
14
50.000
700.000
8
50.000
400.000
400.000 100.000 300.000 50.000
-
12 15 45 60
400.000 100.000 300.000 50.000
1.498.000 1.400.000 13.500.000 3.000.000
18 15 45 60
400.000 100.000 300.000 50.000
10.502.000 1.600.000 13.500.000 3.000.000
-
400.000 100.000 300.000 50.000
-
12 13 27 41
400.000 100.000 300.000 50.000
3.360.500 1.270.000 7.790.000 2.050.000
8 7 13 19
400.000 100.000 300.000 50.000
4.639.500 730.000 4.210.000 950.000
-
50.000
-
14
50.000
700.000
20
50.000
1.000.000
6.600.000
-
6.600.000
106.850.000
trip
136
50.000
6.800.000
38
50.000
1.900.000
-
50.000
-
38
50.000
1.900.000
98
50.000
4.900.000
trip
55
300.000
16.500.000
-
300.000
-
-
300.000
-
-
300.000
-
55
300.000
16.500.000
trip
323
50.000
16.150.000
94
50.000
4.700.000
-
50.000
-
94
50.000
4.700.000
229
50.000
11.450.000
trip
165
300.000
49.500.000
-
300.000
-
-
300.000
-
-
300.000
-
165
300.000
49.500.000
trip trip trip
26 26 26
100.000 100.000 50.000
2.600.000 2.600.000 1.300.000
-
100.000 100.000 50.000
-
-
100.000 100.000 50.000
-
-
100.000 100.000 50.000
-
26 26 26
100.000 100.000 50.000
2.600.000 2.600.000 1.300.000
trip trip trip
72 72 72
100.000 100.000 50.000
7.200.000 7.200.000 3.600.000
-
100.000 100.000 50.000
-
-
100.000 100.000 50.000
-
-
100.000 100.000 50.000
-
72 72 72
100.000 100.000 50.000
7.200.000 7.200.000 3.600.000
3.000.000
-
-
-
3.000.000
trip trip trip
6 6 6
100.000 100.000 50.000
600.000 600.000 300.000
-
100.000 100.000 50.000
-
-
100.000 100.000 50.000
-
-
100.000 100.000 50.000
-
6 6 6
100.000 100.000 50.000
600.000 600.000 300.000
trip trip trip
6 6 6
100.000 100.000 50.000
600.000 600.000 300.000
-
100.000 100.000 50.000
-
-
100.000 100.000 50.000
-
-
100.000 100.000 50.000
-
6 6 6
100.000 100.000 50.000
600.000 600.000 300.000
38.400.000 trip m/d m/d
18 18 36
100.000 300.000 50.000
1.800.000 5.400.000 1.800.000
15.202.000 7 3 10
100.000 300.000 50.000
623.000 825.000 500.000
-
100.000 300.000 50.000
-
15.202.000 7 3 10
100.000 300.000 50.000
623.000 825.000 500.000
23.198.000 11 15 26
100.000 300.000 50.000
1.177.000 4.575.000 1.300.000
II.7 // 37 of 50
NO
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
b
c
From Batam to Tanjung Pinang Sea Transport Tranport Acomodation OSA From Karimun to Tanjung Pinang Sea Transport Tranport Acomodation OSA
Rate
b
c
a b
c
1
2
3
Special Event (by request) From Bintan to Tanjung Pinang Tranport Acomodation OSA From Batam to Tanjung Pinang Sea Transport Tranport Acomodation OSA From Karimun to Tanjung Pinang Sea Transport Tranport Acomodation OSA
INVOICE SAAT INI
Jumlah
Vol
Rate
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
SISA KONTRAK
Jumlah
Vol
Rate
Jumlah
100.000 100.000 300.000 50.000
2.200.000 2.200.000 6.600.000 2.200.000
16 12 15 28
100.000 100.000 300.000 50.000
1.600.000 1.200.000 3.950.000 1.400.000
-
100.000 100.000 300.000 50.000
-
16 12 15 28
100.000 100.000 300.000 50.000
1.600.000 1.200.000 3.950.000 1.400.000
6 10 7 16
100.000 100.000 300.000 50.000
600.000 1.000.000 2.650.000 800.000
trip m/d m/d
18 18 18 36
400.000 100.000 300.000 50.000
7.200.000 1.800.000 5.400.000 1.800.000
7 7 7 14
400.000 100.000 300.000 50.000
1.834.000 700.000 1.870.000 700.000
-
400.000 100.000 300.000 50.000
-
7 7 7 14
400.000 100.000 300.000 50.000
1.834.000 700.000 1.870.000 700.000
11 11 11 22
400.000 100.000 300.000 50.000
5.366.000 1.100.000 3.530.000 1.100.000
Trip Man/Days Trip Man/Days
For Training Inland Transport for Korkot&Askot (4 Kota/Kab) on OC Consolidation From Bintan to Tanjung Pinang Inlandtranport trip From Batam to Tanjung Pinang Sea Transport trip Tranport trip From Karimun to Tanjung Pinang Sea Transport trip Tranport trip Inland Transport for SF, FT, FE, FS (4 Kota/Kab) From Bintan to Tanjung Pinang Inlandtranport From Batam to Tanjung Pinang Sea Transport Tranport From Karimun to Tanjung Pinang Sea Transport Tranport
Rate
22 22 22 44
18 36 18 18
1.500.000 100.000 100.000 300.000
2.5.1.6 FOR SEVERAL TRAINING & SPECIAL EVENT FROM KAB. TO TANJUNG PINANG
a
Vol
trip m/d m/d
2.5.1.5 FROM PROVINCE TO REGIONAL FOR WORKSHOP & COORDINATION MEETING AT OC Workshop OC / Coordination Meeting at OC From Tanjung Pinang to Medan Air Transport OSA [ Fixed ] Local Transport Accomodation
INVOICE LALU
Jumlah
37.800.000
27.000.000 3.600.000 1.800.000 5.400.000
12.515.500
10 22 8 3
1.500.000 100.000 100.000 300.000
133.000.000
8.495.500 2.200.000 920.000 900.000
-
-
1.500.000 100.000 100.000 300.000
13.250.000
-
12.515.500
10 22 8 3
1.500.000 100.000 100.000 300.000
25.762.000
8.495.500 2.200.000 920.000 900.000
25.284.500
8 14 10 15
1.500.000 100.000 100.000 300.000
39.012.000
18.504.500 1.400.000 880.000 4.500.000 93.988.000
8
100.000
800.000
-
100.000
-
-
100.000
-
-
100.000
-
8
100.000
800.000
8 8
100.000 100.000
800.000 800.000
-
100.000 100.000
-
2
100.000 100.000
200.000 -
2 -
100.000 100.000
200.000 -
6 8
100.000 100.000
600.000 800.000
11 13
400.000 100.000
4.400.000 1.300.000
3 5
400.000 100.000
1.200.000 500.000
2 2
400.000 100.000
800.000 200.000
5 7
400.000 100.000
2.000.000 700.000
6 6
400.000 100.000
2.400.000 600.000
trip
4
100.000
400.000
-
100.000
-
-
100.000
-
-
100.000
-
4
100.000
400.000
trip trip
35 35
100.000 100.000
3.500.000 3.500.000
-
100.000 100.000
-
-
100.000 100.000
-
-
100.000 100.000
-
35 35
100.000 100.000
3.500.000 3.500.000
trip trip
11 11
400.000 100.000
4.400.000 1.100.000
-
400.000 100.000
-
-
400.000 100.000
-
-
400.000 100.000
-
11 11
400.000 100.000
4.400.000 1.100.000
trip m/d m/d
-
100.000 300.000 50.000
-
-
100.000 300.000 50.000
-
-
100.000 300.000 50.000
-
-
100.000 300.000 50.000
-
-
100.000 300.000 50.000
-
trip trip m/d m/d
-
100.000 100.000 300.000 50.000
-
-
100.000 100.000 300.000 50.000
-
-
100.000 100.000 300.000 50.000
-
-
100.000 100.000 300.000 50.000
-
-
100.000 100.000 300.000 50.000
-
trip trip m/d m/d
-
400.000 100.000 300.000 50.000
-
-
400.000 100.000 300.000 50.000
-
-
400.000 100.000 300.000 50.000
-
-
400.000 100.000 300.000 50.000
-
-
400.000 100.000 300.000 50.000
II.7 // 38 of 50
NO
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
BRIDGING (July 2014 to April 2015) 1. Konsolidasi Pemandu Pelatihan Penguatan Pemda dan Stakeholder a. Tranport From Kab to Tanjung Pinang - Bintan trip - Batam trip - Karimun trip 2. Pelatihan Penguatan Pemda dan Stakeholder a. Tranport From Kab to Tanjung Pinang - Bintan trip - Batam trip - Karimun trip 3. Konsolidasi Pemandu Pelatihan Penguatan Askot dan Fasilitator a. Tranport From Kab to Tanjung Pinang - Bintan trip - Batam trip - Karimun trip 4. Pelatihan Penguatan Askot dan Fasilitator a. Tranport From Kab to Tanjung Pinang - Bintan trip - Batam trip - Karimun trip 5. Konsolidasi Pemandu Pelatihan PLPBK a. Tranport From Kab to Tanjung Pinang - Bintan trip - Batam trip - Karimun trip 6. Pelatihan Dasar PLBPK a. Tranport From Kab to Tanjung Pinang - Bintan trip 1 - Batam trip 47 - Karimun trip 1 7. Pelatihan Penguatan PLPBK a. Tranport From Kab to Tanjung Pinang - Bintan trip - Batam trip - Karimun trip 8. Pelatihan Tim Teknis PLPBK a. Tranport From Kab to Tanjung Pinang - Bintan trip 1 - Batam trip 47 - Karimun trip 1 9. Orientasi and Planning Training for Livelihood/PPMK (New Location FY 2014) a. Tranport From Kab to Tanjung Pinang trip 82 10. Advance Training for Livelihood/PPMK (Location FY 2012) and (Location 2014) a. Tranport From Kab to Tanjung Pinang trip 92 BRIDGING (Mei to Desember 2015) 1. Konsolidasi Pemandu Pelatihan Pemerintah Daerah a. Tranport From Kab to Tanjung Pinang 2. Pelatihan Pemerintah Daerah a. Tranport From Kab to Tanjung Pinang 3. Konsolidasi Pemandu Pelatihan Penguatan Program Lanjutan a. Tranport From Kab to Tanjung Pinang 4. Pelatihan Penguatan Program Lanjutan a. Tranport From Kab to Tanjung Pinang 5. Pelatihan Penguatan PLPBK a. Tranport From Kab to Tanjung Pinang
INVOICE LALU
Jumlah
Vol
Rate
INVOICE SAAT INI
Jumlah
Vol
Rate
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
SISA KONTRAK
Jumlah
Vol
Rate
Jumlah
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
100.000 100.000 500.000
100.000 4.700.000 500.000
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
1 47 1
100.000 100.000 500.000
100.000 4.700.000 500.000
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
100.000 100.000 500.000
100.000 4.700.000 500.000
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
-
100.000 100.000 500.000
-
1 47 1
100.000 100.000 500.000
100.000 4.700.000 500.000
300.000
24.600.000
50
300.000
11.550.000
300.000
-
50
300.000
11.550.000
32
300.000
13.050.000
300.000
27.600.000
-
300.000
-
56
300.000
16.650.000
56
300.000
16.650.000
36
300.000
10.950.000
trip
4
300.000
1.200.000
-
300.000
-
-
300.000
-
-
300.000
-
4
300.000
1.200.000
trip
20
300.000
6.000.000
-
300.000
-
-
300.000
-
-
300.000
-
20
300.000
6.000.000
trip
5
300.000
1.500.000
-
300.000
-
-
300.000
-
-
300.000
-
5
300.000
1.500.000
trip
82
300.000
24.600.000
-
300.000
-
18
300.000
7.912.000
18
300.000
7.912.000
64
300.000
16.688.000
trip
19
300.000
5.700.000
-
300.000
-
-
300.000
-
-
300.000
-
19
300.000
II.7 // 39 of 50 5.700.000
NO
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
6. Pelatihan Penguatan PPMK a. Tranport From Kab to Tanjung Pinang 7. Pelatihan SIM a. Tranport From Kab to Tanjung Pinang 8. Pelatihan Khusus Askot MK dan Faskel Ekonomi a. Tranport From Kab to Tanjung Pinang 9. Pelatihan Aplikasi Pembukuan UPK (Computerize System) a. Tranport From Kab to Tanjung Pinang 2.5.2 TO JAKARTA 2.5.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST Air Transport In land Travel in Jakarta OSA Hotel Accommodation 2.5.2.2 FOR EGM TO JAKARTA Air Transport 1 EGM TA/SubTA Training 2 EGM TA Sosialisasi 3 EGM TA/SubTA MK/Sub TA RLF 4 EGM TA/SubTA INFRA/Sub TA Safeguard 5 EGM TA/SubTA Monev /Sub TA Legal HCU 6 EGM TA/SubTA SIM 7 EGM TA Local Goverment 8 EGM TA Livelihood & SME's 9 EGM TA Urban Planner
Rate
Jumlah
INVOICE LALU Vol
Rate
INVOICE SAAT INI
Jumlah
Vol
Rate
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
SISA KONTRAK
Jumlah
Vol
Rate
Jumlah
trip
31
300.000
9.300.000
-
300.000
-
-
300.000
-
-
300.000
-
31
300.000
9.300.000
trip
3
300.000
900.000
-
300.000
-
-
300.000
-
-
300.000
-
3
300.000
900.000
trip
18
300.000
5.400.000
-
300.000
-
-
300.000
-
-
300.000
-
18
300.000
5.400.000
trip
21
300.000
6.300.000
-
300.000
-
-
300.000
-
-
300.000
-
21
300.000
6.300.000
trip trip trip trip
53 53 371 318
1.900.000 200.000 100.000 350.000
238.382.700 81.782.700 9.800.000 37.100.000 109.700.000
27 29 158 32
1.900.000 200.000 100.000 350.000
59.158.200 28.758.200 5.000.000 15.800.000 9.600.000
1.900.000 200.000 100.000 350.000
-
27 29 158 32
1.900.000 200.000 100.000 350.000
59.158.200 28.758.200 5.000.000 15.800.000 9.600.000
26 24 213 286
1.900.000 200.000 100.000 350.000
179.224.500 53.024.500 4.800.000 21.300.000 100.100.000
180.447.200
55.974.000
-
55.974.000
124.473.200
trip trip trip trip trip trip trip trip trip
7 7 7 7 7 7 7 7 -
1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000
11.050.400 11.045.400 12.073.800 11.869.200 12.067.700 10.376.300 10.907.800 11.056.600 -
3 3 3 3 3 4 3 3 -
1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000
3.012.500 3.062.500 4.035.900 3.886.300 4.084.800 4.293.400 2.924.900 3.073.700 -
1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000
-
3 3 3 3 3 4 3 3 -
1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000
3.012.500 3.062.500 4.035.900 3.886.300 4.084.800 4.293.400 2.924.900 3.073.700 -
4 4 4 4 4 3 4 4 -
1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000 1.900.000
8.037.900 7.982.900 8.037.900 7.982.900 7.982.900 6.082.900 7.982.900 7.982.900 -
trip m/d
56 224
200.000 100.000
10.000.000 22.400.000
trip
168
350.000
57.600.000
24 96 48
200.000 100.000 350.000
3.600.000 9.600.000 14.400.000
200.000 100.000 350.000
-
24 96 48
200.000 100.000 350.000
3.600.000 9.600.000 14.400.000
32 128 120
200.000 100.000 350.000
6.400.000 12.800.000 43.200.000
trip trip m/d m/d
13 13 40 51
1.900.000 200.000 350.000 100.000
46.400.000 24.700.000 2.600.000 14.000.000 5.100.000
2 2 6 8
1.900.000 200.000 350.000 100.000
5.727.400 2.817.400 310.000 1.800.000 800.000
1.900.000 200.000 350.000 100.000
-
2 2 6 8
1.900.000 200.000 350.000 100.000
5.727.400 2.817.400 310.000 1.800.000 800.000
11 11 34 43
1.900.000 200.000 350.000 100.000
40.672.600 21.882.600 2.290.000 12.200.000 4.300.000
2.5.2.4 FROM PROVINCE (KMW KEPRI) TO OTHER PROVINCE (by request) Air Transport trip In land Transport in Jakarta trip Hotel Accommodation m/d OSA m/d
5 5 15 20
4.000.000 300.000 350.000 100.000
28.750.000 20.000.000 1.500.000 5.250.000 2.000.000
2 2 9
4.000.000 300.000 350.000 100.000
9.269.700 7.969.700 400.000 900.000
4.000.000 300.000 350.000 100.000
-
2 2 9
4.000.000 300.000 350.000 100.000
9.269.700 7.969.700 400.000 900.000
3 3 15 11
4.000.000 300.000 350.000 100.000
19.480.300 12.030.300 1.100.000 5.250.000 1.100.000
In land Transport in Jakarta OSA Hotel Accommodation 2.5.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) Air Transport In land Transport in Jakarta Hotel Accommodation OSA
TOTAL DUTY TRAVEL PROVINCE KEP. RIAU
895.429.900
212.965.300
-
25.762.000
238.727.300
656.702.600
II.7 // 40 of 50
II DIRECT REIMBURSABLE COST 2.8. OFFICE OPERATIONAL EXPENSES NO
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
2.2.1 2.2.1.1 a b c d e
OFFICE RUNNING COST OC Office Propinsi NAD (Banda Aceh) Propinsi Sumatera Utara (Medan) including PD Propinsi Sumatera Barat (Padang) Propinsi Riau (Pekanbaru) Propinsi Kep. Riau (Tanjung Pinang)
2.2.1.2 a
City Coordinator Office Propinsi NAD (8 Kota/Kab) Propinsi Sumatera Utara (8 Kota/Kab) Propinsi Sumatera Barat (5 Kota/Kab) Propinsi Riau (2 Kota/Kab) Propinsi Kep. Riau (2 Kota/Kab)
b c d e
2.2.1.3 a b c d
e
Assitant CD City Coordinator Office Propinsi NAD (5 Kota/Kab) Propinsi Sumatera Utara (6 Kota/Kab) Propinsi Sumatera Barat (7 Kota/Kab) Propinsi Riau (3 Kota/Kab) (Kab. Rokan Hulu), Kab. Non P2KP Propinsi Kep. Riau (2 Kota/Kab)
2.2.2 2.2.2.1 a b c d e
OFFICE SUPPLY & CONSUMABLE OC Office Propinsi NAD (Banda Aceh) Propinsi Sumatera Utara (Medan) including PD Propinsi Sumatera Barat (Padang) Propinsi Riau (Pekanbaru) Propinsi Kep. Riau (Tanjung Pinang)
2.2.2.2 a
City Coordinator Office Propinsi NAD (8 Kota/Kab) Propinsi Sumatera Utara (8 Kota/Kab) Propinsi Sumatera Barat (5 Kota/Kab) Propinsi Riau (2 Kota/Kab) Propinsi Kep. Riau (2 Kota/Kab)
b c d e
mth mth mth mth mth
9,5 33,5 33,5 33,5 33,5
Rate
2.000.000 2.500.000 2.000.000 2.000.000 2.000.000
Jumlah 778.547.580 292.890.497 18.516.780 81.240.118 62.833.364 65.167.006 65.133.229
INVOICE LALU Vol
9,5 30,5 30,5 31,5 31,5
Rate
2.000.000 2.500.000 2.000.000 2.000.000 2.000.000
304.624.728
INVOICE SAAT INI Jumlah 716.159.026 269.491.080 18.516.780 72.941.166 56.320.945 60.940.866 60.771.323
Vol
Rate
2.000.000 2.500.000 2.000.000 2.000.000 2.000.000
281.494.364
INVOICE S/D SAAT INI
Jumlah
Vol -
9,5 30,5 30,5 31,5 31,5
Rate
2.000.000 2.500.000 2.000.000 2.000.000 2.000.000
-
Jumlah 716.159.026 269.491.080 18.516.780 72.941.166 56.320.945 60.940.866 60.771.323
SISA KONTRAK Vol
Rate
3,0 3,0 2,0 2,0
2.000.000 2.500.000 2.000.000 2.000.000 2.000.000
281.494.364
Jumlah 62.388.554 23.399.417 8.298.952 6.512.419 4.226.140 4.361.906 23.130.364
mth
63,0
500.000
30.374.307
63,0
500.000
30.374.307
500.000
-
63,0
500.000
30.374.307
-
500.000
-
mth
264,0
500.000
128.074.828
240,0
500.000
115.306.424
500.000
-
240,0
500.000
115.306.424
24,0
500.000
12.768.404
mth
165,0
500.000
80.889.188
154,0
500.000
75.077.528
500.000
-
154,0
500.000
75.077.528
11,0
500.000
5.811.660
mth
66,0
500.000
32.548.902
62,0
500.000
30.500.902
500.000
-
62,0
500.000
30.500.902
4,0
500.000
2.048.000
mth
66,0
500.000
32.737.503
62,0
500.000
30.235.203
500.000
-
62,0
500.000
30.235.203
4,0
500.000
2.502.300
181.032.355
165.173.582
-
165.173.582
15.858.773
mth
45,0
300.000
13.097.370
45,0
300.000
13.097.370
300.000
-
45,0
300.000
13.097.370
-
300.000
-
mth
198,0
300.000
58.099.350
180,0
300.000
52.663.319
300.000
-
180,0
300.000
52.663.319
18,0
300.000
5.436.031
mth
198,0
300.000
58.642.352
185,0
300.000
53.744.529
300.000
-
185,0
300.000
53.744.529
13,0
300.000
4.897.823
mth mth
99,0 7,0
300.000 300.000
29.470.285 2.100.000
93,0 -
300.000 300.000
27.501.729 -
300.000 300.000
-
93,0 -
300.000 300.000
27.501.729 -
6,0 7,0
300.000 300.000
1.968.556 2.100.000
mth
66,0
300.000
19.622.998
62,0
300.000
18.166.635
300.000
-
62,0
300.000
18.166.635
4,0
300.000
1.456.363
3.000.000 4.000.000 3.000.000 2.500.000 2.500.000
1.333.795.208 424.985.360 28.389.200 132.192.125 99.420.585 82.062.550 82.920.900
3.000.000 4.000.000 3.000.000 2.500.000 2.500.000
1.232.029.219 391.586.410 28.389.200 120.192.125 88.541.635 77.062.550 77.400.900
3.000.000 4.000.000 3.000.000 2.500.000 2.500.000
-
3.000.000 4.000.000 3.000.000 2.500.000 2.500.000
1.232.029.219 391.586.410 28.389.200 120.192.125 88.541.635 77.062.550 77.400.900
3.000.000 4.000.000 3.000.000 2.500.000 2.500.000
101.765.989 33.398.950 12.000.000 10.878.950 5.000.000 5.520.000
mth mth mth mth mth
9,5 33,5 33,5 33,5 33,5
9,5 30,5 30,5 31,5 31,5
607.246.473
563.392.473
9,5 30,5 30,5 31,5 31,5
-
3,0 3,0 2,0 2,0
563.392.473
43.854.000
mth
63,0
1.000.000
61.597.700
63,0
1.000.000
61.597.700
1.000.000
-
63,0
1.000.000
61.597.700
-
1.000.000
-
mth
264,0
1.000.000
253.998.153
240,0
1.000.000
229.638.003
1.000.000
-
240,0
1.000.000
229.638.003
24,0
1.000.000
24.360.150
mth
165,0
1.000.000
161.815.770
154,0
1.000.000
150.356.770
1.000.000
-
154,0
1.000.000
150.356.770
11,0
1.000.000
11.459.000
mth
66,0
1.000.000
65.190.800
62,0
1.000.000
61.190.800
1.000.000
-
62,0
1.000.000
61.190.800
4,0
1.000.000
4.000.000
mth
66,0
1.000.000
64.644.050
62,0
1.000.000
60.609.200
1.000.000
-
62,0
1.000.000
60.609.200
4,0
1.000.000
4.034.850
II.8 // 41 of 50
NO
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
2.2.2.3 a b c d
e
2.2.3 2.2.3.1 a b c d e
2.2.3.2 a b c d e
2.2.3.3 a b c d
e
Assitant CD City Coordinator Office Propinsi NAD (5 Kota/Kab) Propinsi Sumatera Utara (6 Kota/Kab) Propinsi Sumatera Barat (7 Kota/Kab) Propinsi Riau (3 Kota/Kab) (Kab. Rokan Hulu), Kab. Non P2KP Propinsi Kep. Riau (2 Kota/Kab) COMMUNICATION COST OC Office Propinsi NAD (Banda Aceh) Propinsi Sumatera Utara (Medan) including PD Internet for Prov. Sumatera Utara (Medan) including PD Propinsi Sumatera Barat (Padang) Internet for Prov. Sumatera Barat (Padang) Propinsi Riau (Pekanbaru) Internet for Prov. (Pekanbaru) Propinsi Kep. Riau (Tanjung Pinang) Internet for Prov. Kep. Riau (Tanjung Pinang) City Coordinator Office Propinsi NAD (8 Kota/Kab) Propinsi Sumatera Utara (8 Kota/Kab) Propinsi Sumatera Barat (5 Kota/Kab) Propinsi Riau (2 Kota/Kab) Propinsi Kep. Riau (2 Kota/Kab) Assitant CD City Coordinator Office Propinsi NAD (5 Kota/Kab) Propinsi Sumatera Utara (6 Kota/Kab) Propinsi Sumatera Barat (7 Kota/Kab) Propinsi Riau (3 Kota/Kab) (Kab. Rokan Hulu), Kab. Non P2KP Propinsi Kep. Riau (2 Kota/Kab) TOTAL OF OFFICE OPERATIONAL EXPENSES
Rate
Jumlah
INVOICE LALU Vol
Rate
301.563.375
INVOICE SAAT INI Jumlah
Vol
Rate
277.050.336
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
-
Jumlah
SISA KONTRAK Vol
Rate
277.050.336
Jumlah 24.513.039
mth
45,0
500.000
21.931.950
45,0
500.000
21.931.950
500.000
-
45,0
500.000
21.931.950
-
500.000
-
mth
198,0
500.000
98.177.900
180,0
500.000
89.095.100
500.000
-
180,0
500.000
89.095.100
18,0
500.000
9.082.800
mth
198,0
500.000
96.316.725
185,0
500.000
89.612.786
500.000
-
185,0
500.000
89.612.786
13,0
500.000
6.703.939
mth mth
99,0 7,0
500.000 500.000
49.187.800 3.500.000
93,0 -
500.000 500.000
46.169.800 -
500.000 500.000
-
93,0 -
500.000 500.000
46.169.800 -
6,0 7,0
500.000 500.000
3.018.000 3.500.000
mth
66,0
500.000
32.449.000
62,0
500.000
30.240.700
500.000
-
62,0
500.000
30.240.700
4,0
500.000
2.208.300
2.000.000 3.000.000 1.000.000 2.000.000 1.000.000 1.500.000 1.000.000 1.500.000 1.000.000
722.997.817 354.040.854 9.838.035 96.593.240 24.000.000 61.895.406 23.000.000 46.866.584 23.000.000 46.847.589 22.000.000
2.000.000 3.000.000 1.000.000 2.000.000 1.000.000 1.500.000 1.000.000 1.500.000 1.000.000
491.521.069 194.514.569 9.838.035 50.117.906 20.209.759 27.032.385 8.259.617 25.939.923 17.046.518 26.557.426 9.513.000
2.000.000 3.000.000 1.000.000 2.000.000 1.000.000 1.500.000 1.000.000 1.500.000 1.000.000
-
2.000.000 3.000.000 1.000.000 2.000.000 1.000.000 1.500.000 1.000.000 1.500.000 1.000.000
491.521.069 194.514.569 9.838.035 50.117.906 20.209.759 27.032.385 8.259.617 25.939.923 17.046.518 26.557.426 9.513.000
2.000.000 3.000.000 1.000.000 2.000.000 1.000.000 1.500.000 1.000.000 1.500.000 1.000.000
231.476.748 159.526.285 46.475.334 3.790.241 34.863.021 14.740.383 20.926.661 5.953.482 20.290.163 12.487.000
mth mth mth mth mth mth mth mth mth
9,5 33,5 24,0 33,5 23,0 33,5 23,0 33,5 22,0
9,5 30,5 21,0 29,5 17,0 31,5 19,0 30,5 14,0
269.585.084
231.951.505
9,5 30,5 21,0 29,5 17,0 31,5 19,0 30,5 14,0
-
3,0 3,0 4,0 6,0 2,0 4,0 3,0 8,0
231.951.505
37.633.579
mth
63,0
500.000
18.876.881
63,0
500.000
18.876.881
500.000
-
63,0
500.000
18.876.881
-
500.000
-
mth
264,0
500.000
131.194.650
240,0
500.000
119.105.655
500.000
-
240,0
500.000
119.105.655
24,0
500.000
12.088.995
mth
165,0
500.000
64.191.276
151,0
500.000
47.877.307
500.000
-
151,0
500.000
47.877.307
14,0
500.000
16.313.969
mth
66,0
500.000
27.852.722
61,5
500.000
21.684.483
500.000
-
61,5
500.000
21.684.483
4,5
500.000
6.168.239
mth
66,0
500.000
27.469.555
60,0
500.000
24.407.179
500.000
-
60,0
500.000
24.407.179
6,0
500.000
3.062.376
99.371.879
65.054.995
-
65.054.995
34.316.884
mth
45,0
250.000
5.064.451
33,0
250.000
5.064.451
250.000
-
33,0
250.000
5.064.451
12,0
250.000
-
mth
198,0
250.000
49.470.430
180,0
250.000
44.970.430
250.000
-
180,0
250.000
44.970.430
18,0
250.000
4.500.000
mth
113,0
250.000
20.479.358
44,0
250.000
2.519.358
250.000
-
44,0
250.000
2.519.358
69,0
250.000
17.960.000
mth mth
55,0 7,0
250.000 250.000
9.510.500 1.750.000
29,0 -
250.000 250.000
693.056 -
250.000 250.000
-
29,0 -
250.000 250.000
693.056 -
26,0 7,0
250.000 250.000
8.817.444 1.750.000
mth
53,0
250.000
13.097.140
48,0
250.000
11.807.700
250.000
-
48,0
250.000
11.807.700
5,0
250.000
1.289.440
2.835.340.605
2.439.709.314
-
2.439.709.314
395.631.291
II.8 // 42 of 50
II DIRECT REEIMBURSABLE COST 2.9. OFFICE EQUIPMENT EXPENSES NO
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
2.6 2.6.1.1 a b c d e f g h i
OC OFFICE Propinsi Sumatera Utara (Medan) Desktop Computer (Purchase) Laptop/Notebook (Purchase) Printer Laser Jet (Purchase) Printer Color A3 (Purchase) Digital Camera (Purchase) GPS tools (Purchase) LCD Projector (Purchase) Scanner (Purchase) Equipment Maintenance (Include existing equipment)
Unit Unit Unit Unit Unit Unit Unit Unit Atcost
9 11 3 1 1 1 1 2 1
2.6.1.2 a b c d e f g h i
Propinsi NAD (Banda Aceh) Desktop Computer (Purchase) Laptop/Notebook (Purchase) Printer Laser Jet (Purchase) Printer Color A3 (Purchase) Digital Camera (Purchase) GPS tools (Purchase) LCD Projector (Purchase) Scanner (Purchase) Equipment Maintenance (Include existing equipment)
Unit Unit Unit Unit Unit Unit Unit Unit Atcost
2.6.1.3 a b c d e f g h i
Propinsi Sumatera Barat (Padang) Desktop Computer (Purchase) Laptop/Notebook (Purchase) Printer Laser Jet (Purchase) Printer Color A3 (Purchase) Digital Camera (Purchase) GPS tools (Purchase) LCD Projector (Purchase) Scanner (Purchase) Equipment Maintenance (Include existing equipment)
2.6.1.4 a b c d e f g h i
Propinsi Riau (Pekanbaru) Desktop Computer (Purchase) Laptop/Notebook (Purchase) Printer Laser Jet (Purchase) Printer Color A3 (Purchase) Digital Camera (Purchase) GPS tools (Purchase) LCD Projector (Purchase) Scanner (Purchase) Equipment Maintenance (Include existing equipment)
2.6.1.5 a b c d e f g
Propinsi Kep. Riau (Tanjung Pinang) Desktop Computer (Purchase) Laptop/Notebook (Purchase) Printer Laser Jet (Purchase) Printer Color A3 (Purchase) Digital Camera (Purchase) GPS tools (Purchase) LCD Projector (Purchase)
Rate
Jumlah
INVOICE LALU Vol
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000 1.200.000 15.000.000
704.800.000 171.600.000 56.700.000 79.750.000 4.800.000 2.650.000 2.500.000 3.250.000 4.750.000 2.200.000 15.000.000
9 11 3 1 1 1 1 2 0,14
5 10 2 1 1 1 1 1 1
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000 1.200.000 15.000.000
136.450.000 31.500.000 72.500.000 3.200.000 2.650.000 2.500.000 3.250.000 4.750.000 1.100.000 15.000.000
Unit Unit Unit Unit Unit Unit Unit Unit Atcost
5 10 2 1 1 1 1 1 1
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000 1.200.000 15.000.000
Unit Unit Unit Unit Unit Unit Unit Unit Atcost
4 10 2 1 1 1 1 1 1
Unit Unit Unit Unit Unit Unit Unit
4 10 2 1 1 1 1
Rate
Jumlah
INVOICE SAAT INI Vol
Rate
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000 1.200.000 15.000.000
639.038.000 158.695.000 56.700.000 79.750.000 4.800.000 2.650.000 2.500.000 3.250.000 4.750.000 2.200.000 2.095.000
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000 1.200.000 15.000.000
5 10 2 1 1 1 1 1 -
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000 1.200.000 15.000.000
121.450.000 31.500.000 72.500.000 3.200.000 2.650.000 2.500.000 3.250.000 4.750.000 1.100.000 -
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000 1.200.000 15.000.000
136.450.000 31.500.000 72.500.000 3.200.000 2.650.000 2.500.000 3.250.000 4.750.000 1.100.000 15.000.000
5 10 2 1 1 1 1 1 0,08
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000 1.200.000 15.000.000
122.658.000 31.500.000 72.500.000 3.200.000 2.650.000 2.500.000 3.250.000 4.750.000 1.100.000 1.208.000
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000 1.200.000 15.000.000
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000 1.200.000 15.000.000
130.150.000 25.200.000 72.500.000 3.200.000 2.650.000 2.500.000 3.250.000 4.750.000 1.100.000 15.000.000
4 10 2 1 1 1 1 1 0,33
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000 1.200.000 15.000.000
120.105.000 25.200.000 72.500.000 3.200.000 2.650.000 2.500.000 3.250.000 4.750.000 1.100.000 4.955.000
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000 1.200.000 15.000.000
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000
130.150.000 25.200.000 72.500.000 3.200.000 2.650.000 2.500.000 3.250.000 4.750.000
4 10 2 1 1 1 1
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000
116.130.000 25.200.000 72.500.000 3.200.000 2.650.000 2.500.000 3.250.000 4.750.000
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
-
-
Jumlah
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000 1.200.000 15.000.000
5 10 2 1 1 1 1 1 -
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000 1.200.000 15.000.000
121.450.000 31.500.000 72.500.000 3.200.000 2.650.000 2.500.000 3.250.000 4.750.000 1.100.000 -
1
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000 1.200.000 15.000.000
15.000.000 15.000.000
5 10 2 1 1 1 1 1 0,08
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000 1.200.000 15.000.000
122.658.000 31.500.000 72.500.000 3.200.000 2.650.000 2.500.000 3.250.000 4.750.000 1.100.000 1.208.000
0,92
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000 1.200.000 15.000.000
13.792.000 13.792.000
4 10 2 1 1 1 1 1 0,33
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000 1.200.000 15.000.000
120.105.000 25.200.000 72.500.000 3.200.000 2.650.000 2.500.000 3.250.000 4.750.000 1.100.000 4.955.000
0,67
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000 1.200.000 15.000.000
10.045.000 10.045.000
4 10 2 1 1 1 1
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000
116.130.000 25.200.000 72.500.000 3.200.000 2.650.000 2.500.000 3.250.000 4.750.000
-
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000
-
-
Rate
9 11 3 1 1 1 1 2 0,14
-
-
Vol
639.038.000 158.695.000 56.700.000 79.750.000 4.800.000 2.650.000 2.500.000 3.250.000 4.750.000 2.200.000 2.095.000
-
-
Jumlah
SISA KONTRAK
-
0,86
6.500.000 7.500.000 1.750.000 2.750.000 2.500.000 3.500.000 5.000.000 1.200.000 15.000.000
65.762.000 12.905.000 12.905.000
14.020.000 II.9 // 43 of 50
NO
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
h i
Scanner (Purchase) Equipment Maintenance (Include existing equipment)
Unit Atcost
1 1
Rate
Jumlah
1.200.000 15.000.000
1.100.000 15.000.000
INVOICE LALU Vol 1 0
Rate
INVOICE SAAT INI
Jumlah
1.200.000 15.000.000
1.100.000 980.000
8 8 8 8
Vol
Rate
INVOICE S/D SAAT INI
Jumlah
Vol
1.200.000 15.000.000
-
7.500.000 6.500.000 2.750.000 1.200.000
432.500.000 138.400.000 58.000.000 50.400.000 21.200.000 8.800.000
7.500.000 6.500.000 2.750.000 1.200.000
-
1 0
Rate
Jumlah
1.200.000 15.000.000
1.100.000 980.000
8 8 8 8
7.500.000 6.500.000 2.750.000 1.200.000
432.500.000 138.400.000 58.000.000 50.400.000 21.200.000 8.800.000
SISA KONTRAK Vol
Rate
1
Jumlah
1.200.000 15.000.000
14.020.000
-
7.500.000 6.500.000 2.750.000 1.200.000
-
2.6.2 2.6.2.1 a b c d
CITY COORDINATOR OFFICE Propinsi NAD (8 Korkot) Laptop/Notebook (Purchase) Desktop Computer (Purchase) Printer Color A3 (Purchase) Scanner (Purchase)
Unit Unit Unit Unit
8 8 8 8
7.500.000 6.500.000 2.750.000 1.200.000
432.500.000 138.400.000 58.000.000 50.400.000 21.200.000 8.800.000
2.6.2.2 a b c d
Propinsi Sumatera Utara (8 Korkot) Laptop/Notebook (Purchase) Desktop Computer (Purchase) Printer Color A3 (Purchase) Scanner (Purchase)
Unit Unit Unit Unit
8 8 8 8
7.500.000 6.500.000 2.750.000 1.200.000
138.400.000 58.000.000 50.400.000 21.200.000 8.800.000
8 8 8 8
7.500.000 6.500.000 2.750.000 1.200.000
138.400.000 58.000.000 50.400.000 21.200.000 8.800.000
7.500.000 6.500.000 2.750.000 1.200.000
-
8 8 8 8
7.500.000 6.500.000 2.750.000 1.200.000
138.400.000 58.000.000 50.400.000 21.200.000 8.800.000
-
7.500.000 6.500.000 2.750.000 1.200.000
-
2.6.2.3 a b c d
Propinsi Sumatera Barat (5 Korkot) Laptop/Notebook (Purchase) Desktop Computer (Purchase) Printer Color A3 (Purchase) Scanner (Purchase)
Unit Unit Unit Unit
5 5 5 5
7.500.000 6.500.000 2.750.000 1.200.000
86.500.000 36.250.000 31.500.000 13.250.000 5.500.000
5 5 5 5
7.500.000 6.500.000 2.750.000 1.200.000
86.500.000 36.250.000 31.500.000 13.250.000 5.500.000
7.500.000 6.500.000 2.750.000 1.200.000
-
5 5 5 5
7.500.000 6.500.000 2.750.000 1.200.000
86.500.000 36.250.000 31.500.000 13.250.000 5.500.000
-
7.500.000 6.500.000 2.750.000 1.200.000
-
2.6.2.4 a b c d
Propinsi Riau (2 Korkot) Laptop/Notebook (Purchase) Desktop Computer (Purchase) Printer Color A3 (Purchase) Scanner (Purchase)
Unit Unit Unit Unit
2 2 2 2
7.500.000 6.500.000 2.750.000 1.200.000
34.600.000 14.500.000 12.600.000 5.300.000 2.200.000
2 2 2 2
7.500.000 6.500.000 2.750.000 1.200.000
34.600.000 14.500.000 12.600.000 5.300.000 2.200.000
7.500.000 6.500.000 2.750.000 1.200.000
-
2 2 2 2
7.500.000 6.500.000 2.750.000 1.200.000
34.600.000 14.500.000 12.600.000 5.300.000 2.200.000
-
7.500.000 6.500.000 2.750.000 1.200.000
-
2.6.2.5 a b c d
Propinsi Kep. Riau (2 Korkot) Laptop/Notebook (Purchase) Desktop Computer (Purchase) Printer Color A3 (Purchase) Scanner (Purchase)
Unit Unit Unit Unit
2 2 2 2
7.500.000 6.500.000 2.750.000 1.200.000
34.600.000 14.500.000 12.600.000 5.300.000 2.200.000
2 2 2 2
7.500.000 6.500.000 2.750.000 1.200.000
34.600.000 14.500.000 12.600.000 5.300.000 2.200.000
7.500.000 6.500.000 2.750.000 1.200.000
-
2 2 2 2
7.500.000 6.500.000 2.750.000 1.200.000
34.600.000 14.500.000 12.600.000 5.300.000 2.200.000
-
7.500.000 6.500.000 2.750.000 1.200.000
-
2.6.3 2.6.3.1 a b
ASSISTAN CD MANDIRI OFFICE Propinsi NAD (5 AsKorkot CD MAndiri) Desktop Computer (Purchase) Printer InkJet (Purchase)
Unit Unit
5 5
6.500.000 1.300.000
167.900.000 36.500.000 31.500.000 5.000.000
5 5
6.500.000 1.300.000
167.900.000 36.500.000 31.500.000 5.000.000
6.500.000 1.300.000
-
5 5
6.500.000 1.300.000
167.900.000 36.500.000 31.500.000 5.000.000
-
6.500.000 1.300.000
-
2.6.3.2 a b
Propinsi Sumatera Utara ( 6 AsKorkot CD MAndiri) Desktop Computer (Purchase) Printer InkJet (Purchase)
Unit Unit
6 6
6.500.000 1.300.000
43.800.000 37.800.000 6.000.000
6 6
6.500.000 1.300.000
43.800.000 37.800.000 6.000.000
6.500.000 1.300.000
-
6 6
6.500.000 1.300.000
43.800.000 37.800.000 6.000.000
-
6.500.000 1.300.000
-
2.6.3.3 a b
Propinsi Sumatera Barat ( 7 AsKorkot CD MAndiri) Desktop Computer (Purchase) Printer InkJet (Purchase)
Unit Unit
7 7
6.500.000 1.300.000
51.100.000 44.100.000 7.000.000
7 7
6.500.000 1.300.000
51.100.000 44.100.000 7.000.000
6.500.000 1.300.000
-
7 7
6.500.000 1.300.000
51.100.000 44.100.000 7.000.000
-
6.500.000 1.300.000
-
2.6.3.4 a b
Propinsi Riau ( 3 AsKorkot CD Mandiri) Desktop Computer (Purchase) Printer InkJet (Purchase)
Unit Unit
3 3
6.500.000 1.300.000
21.900.000 18.900.000 3.000.000
3 3
6.500.000 1.300.000
21.900.000 18.900.000 3.000.000
6.500.000 1.300.000
-
3 3
6.500.000 1.300.000
21.900.000 18.900.000 3.000.000
-
6.500.000 1.300.000
-
2.6.3.5 a b
Propinsi Kep. Riau ( 2 AsKorkot CD Mandiri) Desktop Computer (Purchase) Printer InkJet (Purchase)
Unit Unit
2 2
6.500.000 1.300.000
14.600.000 12.600.000 2.000.000
2 2
6.500.000 1.300.000
14.600.000 12.600.000 2.000.000
6.500.000 1.300.000
-
2 2
6.500.000 1.300.000
14.600.000 12.600.000 2.000.000
-
6.500.000 1.300.000
-
TOTAL OF OFFICE EQUIPMENT EXPENSES
1.305.200.000
1.239.438.000
-
1.239.438.000
II.9 // 44 of 50 65.762.000
II DIRECT REEIMBURSABLE COST 2.10. RENTAL EXPENSES NO
URAIAN
AMENDEMENT CONTRACT NO. 7 Vol
2.7.1 2.7.1.1 2.7.1.2 2.7.1.3 2.7.1.4 2.7.1.5 2.7.1.6
2.7.2 2.7.2.1 2.7.2.2 2.7.2.3 2.7.2.4 2.7.2.5
2.7.3 2.7.3.1 2.7.3.2 2.7.3.3 2.7.3.4 2.7.3.5
2.7.4 2.7.4.1 2.7.4.2 2.7.4.3 2.7.4.4
2.7.4.5
OC OFFICE SPACE (including furniture, AC etc) NAD (Banda Aceh) Sumatera Utara (Medan) Sumatera Barat (Padang) Riau (Pekanbaru) Kep. Riau (Tanjung Pinang) For City Coordinator (48) VEHICLES (Minimun Y 2010 - Included driver, O & M, Insurance etc) for OC Office NAD (Banda Aceh) Sumatera Utara (Medan) Sumatera Barat (Padang) Riau (Pekanbaru) Kep. Riau (Tanjung Pinang) VEHICLES (Minimun Year 2010 - Included driver, O & M, Insurance etc) for City Coordinator Office NAD (8 Kota/Kab) Sumatera Utara (8 Kota/Kab) Sumatera Barat (5 Kota/Kab) Riau (2 Kota/Kab) Kep. Riau (2 Kota/Kab)
Rate
3.328 9.520 7.072 5.610 5.372 22.248
45.000 45.000 45.000 45.000 45.000 25.000
18,5 100,0 66,5 66,5 67,0
7.000.000 7.000.000 7.000.000 7.000.000 7.000.000
TOTAL OF RENTAL EXPENSES
Vol
Rate
3.328 7.840 5.824 4.620 4.424 20.628
45.000 45.000 45.000 45.000 45.000 25.000
18,5 94,0 62,5 62,5 63,0
7.000.000 7.000.000 7.000.000 7.000.000 7.000.000
2.229.500.000 129.500.000 700.000.000 465.500.000 465.500.000 469.000.000
INVOICE SAAT INI Jumlah
1.620.045.000 149.600.000 352.800.000 259.800.000 207.200.000 198.920.000 451.725.000
129.500.000 658.000.000 437.500.000 437.500.000 441.000.000
Rate
1.248 990 948
45.000 45.000 45.000 45.000 45.000 25.000
7.000.000
441.000.000
63,0
7.000.000
441.000.000
264,0
7.000.000
1.848.000.000
248,0
7.000.000
1.736.000.000
165,0
7.000.000
1.155.000.000
155,0
7.000.000
66,5
7.000.000
465.500.000
62,5
67,0
7.000.000
469.000.000
63,0
INVOICE S/D SAAT INI
Jumlah
Vol
143.370.000 56.160.000 44.550.000 42.660.000 -
Rate
3.328 7.840 7.072 5.610 5.372 20.628
45.000 45.000 45.000 45.000 45.000 25.000
18,5 97,0 64,5 64,5 65,0
7.000.000 7.000.000 7.000.000 7.000.000 7.000.000
63.000.000
3,0 2,0 2,0 2,0
7.000.000 7.000.000 7.000.000 7.000.000 7.000.000
4.140.500.000
63,0
21.000.000 14.000.000 14.000.000 14.000.000
Jumlah 1.763.415.000 149.600.000 352.800.000 315.960.000 251.750.000 241.580.000 451.725.000
SISA KONTRAK Vol
Rate
1.680 1.620
45.000 45.000 45.000 45.000 45.000 25.000
3 2 2 2
7.000.000 7.000.000 7.000.000 7.000.000 7.000.000
2.166.500.000
119.000.000
129.500.000 679.000.000 451.500.000 451.500.000 455.000.000
Jumlah 180.075.000 75.600.000 104.475.000
63.000.000
4.259.500.000
21.000.000 14.000.000 14.000.000 14.000.000
119.000.000
7.000.000
-
63,0
7.000.000
441.000.000
-
7.000.000
-
8
7.000.000
56.000.000
256,0
7.000.000
1.792.000.000
8
7.000.000
56.000.000
1.085.000.000
5
7.000.000
35.000.000
160,0
7.000.000
1.120.000.000
5
7.000.000
35.000.000
7.000.000
437.500.000
2
7.000.000
14.000.000
64,5
7.000.000
451.500.000
2
7.000.000
14.000.000
7.000.000
441.000.000
2
7.000.000
14.000.000
65,0
7.000.000
455.000.000
2
7.000.000
14.000.000
312.000.000
291.500.000
47,5
500.000
23.750.000
47,5
500.000
23.750.000
201,0
500.000
100.500.000
189,0
500.000
94.500.000
201,0
500.000
100.500.000
189,0
500.000
100,5 7,0
500.000 500.000
50.250.000 3.500.000
94,5 -
67,0
500.000
33.500.000
63,0
8.863.490.000
Vol
2.103.500.000
4.378.500.000
MOTORCYCLE (Minimun Year 2010 - Included O & M, Insurance etc)For Assistant CD Mnandiri of City Coordinators NAD (5 Kota/Kab) Sumatera Utara (6 Kota/Kab) Sumatera Barat (7 Kota/Kab) Riau (3 Kota/Kab) (Kab. Rokan Hulu), Kab. Non P2KP Kep. Riau (2 Kota/Kab)
Jumlah 1.943.490.000 149.600.000 428.400.000 315.960.000 251.750.000 241.580.000 556.200.000
INVOICE LALU
8.500.000
300.000.000
12.000.000
500.000
-
47,5
500.000
23.750.000
-
500.000
-
6
500.000
3.000.000
195,0
500.000
97.500.000
6
500.000
3.000.000
94.500.000
6
500.000
3.000.000
195,0
500.000
97.500.000
6
500.000
3.000.000
500.000 500.000
47.250.000 -
3
500.000 500.000
1.500.000 -
97,5 -
500.000 500.000
48.750.000 -
3 7
500.000 500.000
1.500.000 3.500.000
500.000
31.500.000
2
500.000
1.000.000
65,0
500.000
32.500.000
2
500.000
1.000.000
8.155.545.000
333.870.000
8.489.415.000
374.075.000
II.10 // 45of 50
II DIRECT REEIMBURSABLE COST 2.11. REPORTING EXPENSES NO
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
2.5.1
Rate
REGULAR REPORT
Jumlah
INVOICE LALU Vol
Rate
20.000.000
INVOICE SAAT INI
Jumlah
Vol
Rate
11.400.000
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
-
SISA KONTRAK
Jumlah
Vol
Rate
11.400.000
Jumlah 8.600.000
a
Inception Report
Ekp
15
50.000
750.000
15
50.000
750.000
50.000
-
15
50.000
750.000
-
50.000
-
b
Monthly Report
Ekp
315
25.000
7.875.000
240
25.000
6.000.000
25.000
-
240
25.000
6.000.000
75
25.000
1.875.000 1.575.000
c
Quarterly Report
Ekp
135
35.000
4.725.000
90
35.000
3.150.000
35.000
-
90
35.000
3.150.000
45
35.000
d
Annual Report
Ekp
45
50.000
2.250.000
30
50.000
1.500.000
50.000
-
30
50.000
1.500.000
15
50.000
750.000
e
Draft Final Report
Ekp
20
50.000
1.000.000
-
50.000
-
50.000
-
-
50.000
-
20
50.000
1.000.000
f
Final Report (Indonesia & English)
Ekp
40
50.000
2.000.000
-
50.000
-
50.000
-
-
50.000
-
40
50.000
2.000.000
g
Executive Summary (Indonesia & English)
Ekp
40
35.000
1.400.000
-
35.000
-
35.000
-
-
35.000
-
40
35.000
1.400.000
2.5.2
SPECIAL REPORT
5.900.000
-
-
-
5.900.000
a
Performance Evaluation of OC
Ekp
60
35.000
2.100.000
-
35.000
-
35.000
-
-
35.000
-
60
35.000
2.100.000
b
Complaint Resolution Follow-up Report
Ekp
80
30.000
2.400.000
-
30.000
-
30.000
-
-
30.000
-
80
30.000
2.400.000
c
Workshop Findings and Results
Ekp
40
35.000
1.400.000
-
35.000
-
35.000
-
-
35.000
-
40
35.000
1.400.000
TOTAL REPORTING EXPENSES
25.900.000
11.400.000
-
11.400.000
14.500.000
II.11 // 46 of 50
3. BREAKDOWN OF TRAINING ACTIVITY NO
URAIAN
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
3.3.1 a
IN REGIONAL LEVELS Rakor OC (4 kali dalam 1 tahun) - Kits - Speaker honorarium
3.3.2 a
IN PROVINCIAL LEVELS OC Consolidation : OC Consolidation Sumatera Utara OC Consolidation NAD OC Consolidation Sumatera Barat OC Consolidation Riau OC Consolidation Kep. Riau Pelatihan Penguatan PLPBK : - Propinsi Sumatera Utara - Propinsi NAD - Propinsi Sumatera Barat - Propinsi Riau - Propinsi Kep. Riau Advance Training/Couching PLPBK for City Coordinator Training for City Coordinators Assistants (Infrastructure, Economic, Community Dev, MIS, Urban Planner) Special Training for Kelurahan Facilitators (Technic) Special Training for Kelurahan Facilitators (Economic) Special Training for Kelurahan Facilitators (Social) Special Training for Senior Facilitators Pelatihan Dasar Pemda Pelatihan Dasar Pemda Training of AKP & Planning for Local Goverment Training of AKP & Planning for Local Goverment Special Training for Technical Team of PLPBK Training of Poverty Budgeting for Local Government Training of Poverty Budgeting for Local Government Speaker honorarium Training for Local Auditor Prov. Sumut - Kits (Training Material) - Honorarium (Narasumber & Pemandu)
b
c d e f g h i j k l m n
3.3.3 a b
In City/Regency Levels Diskusi/refleksi tematik KBP Konsolidasi Faskel, Askot, Korkot
m/d piece pers
Rate
152 56 -
250.000 50.000 500.000
3.3.2 a
BRIDGING PERIODE JULI 2014 up to APRIL 2015 IN REGIONAL LEVELS Rakor OC (4 kali dalam 1 tahun) - Kits - Speaker honorarium
Vol
40.629.000 37.900.000 2.729.000 -
Rate
152 56 -
250.000 50.000 500.000
777.760.825
INVOICE SAAT INI Jumlah
Vol
40.629.000 37.900.000 2.729.000 -
Rate 250.000 50.000 500.000
744.660.825
INVOICE S/D SAAT INI
Jumlah
Vol -
Rate
152 56 -
250.000 50.000 500.000
-
SISA KONTRAK
Jumlah
Vol
40.629.000 37.900.000 2.729.000 -
Rate -
250.000 50.000 500.000
744.660.825
Jumlah 33.100.000
m/d m/d m/d m/d m/d
368 148 258 128 114
100.000 100.000 100.000 100.000 100.000
36.800.000 14.677.400 25.725.625 12.630.000 11.271.600
266 148 258 128 114
100.000 100.000 100.000 100.000 100.000
26.575.000 14.677.400 25.725.625 12.630.000 11.271.600
100.000 100.000 100.000 100.000 100.000
-
266 148 258 128 114
100.000 100.000 100.000 100.000 100.000
26.575.000 14.677.400 25.725.625 12.630.000 11.271.600
102 -
100.000 100.000 100.000 100.000 100.000
10.225.000 -
m/d m/d m/d m/d m/d m/d
305 410 545 108 65 -
75.000 75.000 75.000 75.000 75.000 175.000
22.875.000 30.750.000 40.881.000 8.078.500 4.851.000 -
410 545 108 65 -
75.000 75.000 75.000 75.000 75.000 175.000
30.750.000 40.881.000 8.078.500 4.851.000 -
75.000 75.000 75.000 75.000 75.000 175.000
-
410 545 108 65 -
75.000 75.000 75.000 75.000 75.000 175.000
30.750.000 40.881.000 8.078.500 4.851.000 -
305 -
75.000 75.000 75.000 75.000 75.000 175.000
22.875.000 -
m/d
481
175.000
83.992.000
481
175.000
83.992.000
175.000
-
481
175.000
83.992.000
-
175.000
-
m/d m/d m/d m/d m/d m/d m/d m/d m/d h h pers m/d piece pers
981 581 696 524 -
175.000 175.000 175.000 175.000 175.000 350.000 175.000 350.000 175.000 175.000 350.000 500.000 350.000 75.000 500.000
170.515.400 101.500.700 121.696.850 91.515.750 -
981 581 696 524 -
175.000 175.000 175.000 175.000 175.000 350.000 175.000 350.000 175.000 175.000 350.000 500.000 350.000 75.000 500.000
170.515.400 101.500.700 121.696.850 91.515.750 -
175.000 175.000 175.000 175.000 175.000 350.000 175.000 350.000 175.000 175.000 350.000 500.000 350.000 75.000 500.000
-
981 581 696 524 -
175.000 175.000 175.000 175.000 175.000 350.000 175.000 350.000 175.000 175.000 350.000 500.000 350.000 75.000 500.000
170.515.400 101.500.700 121.696.850 91.515.750 -
-
175.000 175.000 175.000 175.000 175.000 350.000 175.000 350.000 175.000 175.000 350.000 500.000 350.000 75.000 500.000
-
582 3.424
75.000 50.000
214.669.300 43.523.800 171.145.500
582 3.424
75.000 50.000
214.669.300 43.523.800 171.145.500
75.000 50.000
-
582 3.424
75.000 50.000
214.669.300 43.523.800 171.145.500
-
75.000 50.000
-
m/d m/d
TOTAL OF TRAINING ACTIVITY 2013
3.3.1 a
INVOICE LALU
Jumlah
1.033.059.125
m/d piece pers
52 26 4
250.000 50.000 500.000
16.300.000 13.000.000 1.300.000 2.000.000
999.959.125
31 22 -
250.000 50.000 500.000
2.089.767.500
8.497.610 7.600.000 897.610 -
-
250.000 50.000 500.000
1.393.346.750
-
999.959.125
31 22 -
250.000 50.000 500.000
-
8.497.610 7.600.000 897.610 -
33.100.000
21 4 4
250.000 50.000 500.000
1.393.346.750
7.802.390 5.400.000 402.390 2.000.000
IN PROVINCIAL LEVELS OC Consolidation : - OC Consolidation Sumatera Utara - OC Consolidation Sumatera Barat - OC Consolidation Riau - OC Consolidation Kep. Riau
696.420.750
m/d m/d m/d m/d
42 34 21 20
100.000 100.000 100.000 100.000
4.200.000 3.400.000 2.100.000 2.000.000
34 21 20
100.000 100.000 100.000 100.000
3.400.000 2.050.000 2.000.000
100.000 100.000 100.000 100.000
-
34 21 20
100.000 100.000 100.000 100.000
3.400.000 2.050.000 2.000.000
42 -
100.000 100.000 100.000 100.000
4.200.000 50.000 -
b
Konsolidasi Pemandu Pelatihan Penguatan Pemda dan Stakeholder
m/d
-
350.000
-
-
350.000
-
350.000
-
-
350.000
-
-
350.000
-
c d e f
Pelatihan Penguatan Pemda dan Stakeholder Konsolidasi Pemandu Pelatihan Penguatan Askot dan Fasilitator Pelatihan Penguatan Askot dan Fasilitator Konsolidasi Pemandu Pelatihan PLPBK
m/d m/d m/d m/d
-
350.000 175.000 175.000 175.000
-
-
350.000 175.000 175.000 175.000
-
350.000 175.000 175.000 175.000
-
-
350.000 175.000 175.000 175.000
-
-
350.000 175.000 175.000 175.000
III.3 // 47 of 50
NO g h i j k
3.3.3 a b c d e
URAIAN Pelatihan Dasar PLBPK Pelatihan Penguatan PLPBK Pelatihan Tim Teknis PLPBK Orientasi and Planning Training for Livelihood/PPMK (New Location FY 2014) Advance Training for Livelihood/PPMK (Location FY 2012) and (Location 2014) In City/Regency Levels Pelatihan Aplikasi Pembukuan UPK (computerize system) Diskusi/refleksi tematik KBP Konsolidasi Faskel, Askot, Korkot Pelatihan Pegembangan Federasi UPK Pelatihan Pengelolaan BDC
UNIT
AMENDEMENT CONTRACT NO. 7
3.3.2 a
BRIDGING PERIODE MEI up to DESEMBER 2015 IN REGIONAL LEVELS Rakor OC (4 kali dalam 1 tahun) - Kits - Speaker honorarium
INVOICE SAAT INI
Rate
Jumlah
Vol
Rate
Jumlah
m/d m/d m/d
1.224 208
175.000 175.000 175.000
214.142.500 36.400.000
1.224 94
175.000 175.000 175.000
214.142.500 16.376.900
175.000 175.000 175.000
m/d
4.935
175.000
863.625.000
2.530
175.000
510.177.400
m/d
5.508
175.000
963.900.000
3.686
175.000
645.199.950
m/d m/d m/d m/d m/d
1.360 1.026 -
175.000 75.000 50.000 175.000 175.000
153.300.000 102.000.000 51.300.000 -
1.339 870 -
175.000 75.000 50.000 175.000 175.000
142.354.375 98.871.625 43.482.750 -
TOTAL TRAINING ACTIVITY (BRIDGING)
3.3.1 a
INVOICE LALU
Vol
2.259.367.500
m/d piece pers
80 40 4
250.000 50.000 500.000
24.000.000 20.000.000 2.000.000 2.000.000
Vol
Rate
250.000 50.000 500.000
Rate
-
1.224 94
175.000 175.000 175.000
214.142.500 16.376.900
114
175.000 175.000 175.000
20.023.100
175.000
-
2.530
175.000
510.177.400
2.405
175.000
353.447.600
175.000
-
3.686
175.000
645.199.950
1.822
175.000
318.700.050
175.000 75.000 50.000 175.000 175.000
-
1.339 870 -
175.000 75.000 50.000 175.000 175.000
142.354.375 98.871.625 43.482.750 -
21 156 -
175.000 75.000 50.000 175.000 175.000
10.945.625 3.128.375 7.817.250 -
-
250.000 50.000 500.000
Vol
Rate
1.544.198.735
62 26 -
250.000 50.000 500.000
715.168.765
18 14 4
250.000 50.000 500.000
100.000 100.000 100.000 100.000
8.600.000 7.200.000 4.200.000 4.000.000
43 36 21 20
100.000 100.000 100.000 100.000
4.300.000 3.600.000 3.158.580 2.038.000
100.000 100.000 100.000 100.000
-
43 36 21 20
100.000 100.000 100.000 100.000
4.300.000 3.600.000 3.158.580 2.038.000
43 36 21 20
100.000 100.000 100.000 100.000
4.300.000 3.600.000 1.041.420 1.962.000
b c
Konsolidasi Pemandu Pelatihan Pemerintah Daerah Pelatihan Pemerintah Daerah
m/d m/d
57 600
350.000 350.000
19.950.000 210.000.000
-
350.000 350.000
-
350.000 350.000
-
-
350.000 350.000
-
57 600
350.000 350.000
19.950.000 210.000.000
d
Konsolidasi Pemandu Pelatihan Penguatan Program Lanjutan
m/d
49
175.000
8.575.000
45
175.000
7.730.000
175.000
-
45
175.000
7.730.000
4
175.000
845.000
e f g h i j k
Pelatihan Penguatan Program Lanjutan Pelatihan Penguatan PLPBK Pelatihan Tim Teknis PLPBK (Sumbar) Pelatihan Penguatan PPMK Pelatihan SIM Pelatihan Khusus Askot MK dan Faskel Ekonomi Pelatihan Aplikasi Pembukuan UPK (Computerize System)
m/d m/d m/d m/d m/d m/d m/d
4.695 636 236 1.670 102 555 1.095
175.000 175.000 350.000 175.000 175.000 175.000 175.000
821.625.000 111.300.000 82.600.000 292.250.000 17.850.000 97.125.000 191.625.000
4.542 97 -
175.000 175.000 350.000 175.000 175.000 175.000 175.000
794.748.250 16.877.850 -
175.000 175.000 350.000 175.000 175.000 175.000 175.000
-
4.542 97 -
175.000 175.000 350.000 175.000 175.000 175.000 175.000
794.748.250 16.877.850 -
153 636 236 1.670 5 555 1.095
175.000 175.000 350.000 175.000 175.000 175.000 175.000
26.876.750 111.300.000 82.600.000 292.250.000 972.150 97.125.000 191.625.000
41.076.120
832.452.680
7.432.700 4.700.000 732.700 2.000.000
86 72 42 40
1.540.900.000
-
16.567.300 15.300.000 1.267.300 -
Jumlah
m/d m/d m/d m/d
In City/Regency Levels
832.452.680
-
Jumlah
IN PROVINCIAL LEVELS OC Consolidation : - OC Consolidation Sumatera Utara - OC Consolidation Sumatera Barat - OC Consolidation Riau - OC Consolidation Kep. Riau
3.3.3
1.876.900.000
16.567.300 15.300.000 1.267.300 -
SISA KONTRAK
Vol
1.544.198.735
62 26 -
INVOICE S/D SAAT INI
Jumlah
-
1.044.447.320
41.076.120
1.499.823.880
a
Thematic Discussion / Reflection of KBP, City Changer, Forum BKM
m/d
1.492
75.000
111.900.000
-
75.000
-
75.000
-
-
75.000
-
1.492
75.000
111.900.000
b
Consolidation of Kelurahan Facilitator, City Coordinator, Assistentc & City Coordinators
m/d
2.811
50.000
140.550.000
822
50.000
41.076.120
50.000
-
822
50.000
41.076.120
1.989
50.000
99.473.880
c
Pelatihan Aplikasi Pembukuan UPK (computerize system)
m/d
6.755
175.000
1.182.125.000
-
175.000
-
175.000
-
-
175.000
-
6.755
175.000
1.182.125.000
d e
Pelatihan Pegembangan Federasi UPK Pelatihan Pengelolaan BDC (3 Kab/Kota) Speaker Honorarium
m/d m/d pers
384 215 3
175.000 175.000 500.000
67.200.000 37.625.000 1.500.000
-
175.000 175.000 500.000
-
175.000 175.000 500.000
-
-
175.000 175.000 500.000
-
384 215 3
175.000 175.000 500.000
67.200.000 37.625.000 1.500.000
TOTAL TRAINING ACTIVITY (BRIDGING MEI up to DESEMBER 2015)
3.441.800.000
890.096.100
-
890.096.100
2.551.703.900
TOTAL TRAINING ACTIVITY
6.734.226.625
3.434.253.960
-
3.434.253.960
3.299.972.665
III.3 // 48 of 50
IV. SOCIALIZATION ACTIVITY EXPENSES [ FIXED ] No
URAIAN
Unit
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Jumlah
INVOICE LALU Vol
Rate
INVOICE SAAT INI Jumlah
Vol
Rate
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
Jumlah
SISA KONTRAK Vol
Rate
Jumlah
4.1.
PROVINCIAL LEVELS (Prov. Sumatera Utara, NAD, Sumatera Barat, Riau & Kep. Riau)
229.199.400
199.449.400
-
199.449.400
29.750.000
4.1.1.
Lokakarya Review Propinsi/midterm
118.011.900
88.261.900
-
88.261.900
29.750.000
a
Kegiatan Lokakarya 100 92 88
250.000 250.000 250.000
25.000.000 23.000.000 22.000.000
92 88
250.000 250.000 250.000
23.000.000 22.000.000
-
250.000 250.000 250.000
-
92 88
250.000 250.000 250.000
23.000.000 22.000.000
100 -
250.000 250.000 250.000
25.000.000 -
49 60 23
250.000 250.000 250.000
12.250.000 15.000.000
49 60
250.000 250.000
12.250.000 15.000.000
-
250.000 250.000
-
49 60
250.000 250.000
12.250.000 15.000.000
-
250.000 250.000
-
m/d pcs
10 212
500.000 50.000
5.550.000 4.700.000 10.511.900
21 7 157
250.000 500.000 50.000
5.050.000 3.200.000 7.761.900
-
250.000 500.000 50.000
-
21 7 157
250.000 500.000 50.000
5.050.000 3.200.000 7.761.900
2 3 55
250.000 500.000 50.000
500.000 1.500.000 2.750.000
- Propinsi Sumatera Utara - Propinsi NAD
m/d m/d
b
- Propinsi Sumatera Barat - Propinsi Riau - Propinsi Kep. Riau Press Conference
m/d m/d m/d m/d
c d
Nara Sumber Provinsi Kits Lokakarya
4.1.2
53.687.500
Workshop Media
53.687.500
-
53.687.500
-
a b
Kegiatan Workshop Narasumber Workshop
m/d m/d
195 6
250.000 500.000
48.503.000 2.700.000
195 6
250.000 500.000
48.503.000 2.700.000
-
250.000 500.000
-
195 6
250.000 500.000
48.503.000 2.700.000
-
250.000 500.000
-
c
Kits Workshop
pcs
51
50.000
2.484.500
51
50.000
2.484.500
-
50.000
-
51
50.000
2.484.500
-
50.000
-
4.1.3
Penulisan Artikel / Berita
time
5
1.000.000
5.000.000
5
1.000.000
5.000.000
-
1.000.000
-
5
1.000.000
5.000.000
-
1.000.000
-
4.1.4.
TV Talkshow
time
7
7.500.000
52.500.000
7
7.500.000
52.500.000
-
7.500.000
-
7
7.500.000
52.500.000
-
7.500.000
-
4.2. 4.2.1
CITY/REGENCY LEVELS Lokakarya Review /midterm
661.189.500
661.189.500
-
661.189.500
-
- Kegiatan Lokakarya - Press Conference - Nara Sumber Provinsi
m/d m/d m/d
3.220 199 48
125.000 125.000 300.000
402.429.300 24.645.700 14.200.000
3.220 199 48
125.000 125.000 300.000
402.429.300 24.645.700 14.200.000
-
125.000 125.000 300.000
-
3.220 199 48
125.000 125.000 300.000
402.429.300 24.645.700 14.200.000
-
125.000 125.000 300.000
-
4.2.2 4.2.3 4.2.4
Radio Talkshow Media Field Visit Penulisan Artikel / Berita
time time time
144 45
500.000 500.000
71.900.000 22.500.000
144 45
500.000 500.000
71.900.000 22.500.000
-
500.000 500.000
-
144 45
500.000 500.000
71.900.000 22.500.000
-
500.000 500.000
-
4.2.5
Exibithion
time
122 14
500.000 5.000.000
61.000.000 64.514.500
122 14
500.000 5.000.000
61.000.000 64.514.500
-
500.000 5.000.000
-
122 14
500.000 5.000.000
61.000.000 64.514.500
-
500.000 5.000.000
-
TOTAL OF SOCIAL ACTIVITY
4.1. 4.1.1. a
BRIDGING PERIODE JULI 2014 up to APRIL 2015 PROVINCIAL LEVELS (Prov. Sumatera Utara, NAD, Sumatera Lokakarya Review Propinsi/midterm Kegiatan Lokakarya
890.388.900
860.638.900
-
860.638.900
29.750.000
205.700.000
192.410.000
-
192.410.000
13.290.000
90.700.000
78.660.000
-
78.660.000
12.040.000
- Propinsi Sumatera Utara
m/d
150
250.000
37.500.000
132
250.000
32.910.000
-
250.000
-
132
250.000
32.910.000
18
250.000
4.590.000
m/d m/d m/d m/d
150 20
250.000 250.000 250.000 250.000
37.500.000 -
150 -
250.000 250.000 250.000
37.500.000 -
-
250.000 250.000 250.000
-
150 -
250.000 250.000 250.000
37.500.000 -
-
250.000 250.000 250.000
-
b
- Propinsi Sumatera Barat - Propinsi Riau - Propinsi Kep. Riau Press Conference
c
Nara Sumber Provinsi
m/d
4
500.000
5.000.000 2.000.000
15 1
250.000 500.000
3.750.000 600.000
-
250.000 500.000
-
15 1
250.000 500.000
3.750.000 600.000
5 3
250.000 500.000
1.250.000 1.400.000
d
Kits Lokakarya
pcs
174
50.000
8.700.000
78
50.000
3.900.000
-
50.000
-
78
50.000
3.900.000
96
50.000
4.800.000
4.1.2 a b
Workshop Media Kegiatan Workshop Narasumber Workshop
m/d m/d
156 8
250.000 500.000
c
Kits Workshop
pcs
80
50.000
47.000.000 39.000.000 4.000.000 4.000.000
156 8 80
250.000 500.000 50.000
47.000.000 39.000.000 4.000.000 4.000.000
-
250.000 500.000 50.000
-
156 8 80
250.000 500.000 50.000
47.000.000 39.000.000 4.000.000 4.000.000
-
250.000 500.000 50.000
-
4.1.3 4.1.4.
Penulisan Artikel / Berita TV Talkshow
time time
8 8
1.000.000 7.500.000
8.000.000 60.000.000
8 8
1.000.000 7.500.000
8.000.000 58.750.000
-
1.000.000 7.500.000
-
8 8
1.000.000 7.500.000
8.000.000 58.750.000
-
1.000.000 7.500.000
1.250.000
IV // 49 of 50
No
URAIAN
Unit
AMENDEMENT CONTRACT NO. 7 Vol
Rate
INVOICE LALU
Jumlah
Vol
Rate
INVOICE SAAT INI Jumlah
Vol
Rate
INVOICE S/D SAAT INI
Jumlah
Vol
Rate
SISA KONTRAK
Jumlah
Vol
Rate
Jumlah
PROVINCIAL LEVELS (Prov. Sumatera Utara, NAD, CITY/REGENCY LEVELS Sumatera Lokakarya Review /midterm Barat, Riau & Kep. Riau) - Kegiatan Lokakarya - Press Conference - Nara Sumber Provinsi
m/d m/d m/d
3.840 320 64
125.000 125.000 300.000
480.000.000 40.000.000
3.812 320
125.000 125.000
476.460.000 40.000.000
-
125.000 125.000
-
3.812 320
125.000 125.000
476.460.000 40.000.000
28 -
125.000 125.000
3.540.000 -
19.200.000
64
300.000
19.200.000
-
300.000
-
64
300.000
19.200.000
-
300.000
-
4.2.2
Radio Talkshow
time
87
500.000
4.2.3 4.2.4 4.2.5
Media Field Visit Penulisan Artikel / Berita Exibithion
time time time
67 85 5
500.000 500.000 5.000.000
43.500.000 33.500.000
87 67
500.000 500.000
43.500.000 33.500.000
-
500.000 500.000
-
87 67
500.000 500.000
43.500.000 33.500.000
-
500.000 500.000
-
42.500.000 25.000.000
85 5
500.000 5.000.000
42.500.000 25.000.000
-
500.000 5.000.000
-
85 5
500.000 5.000.000
42.500.000 25.000.000
-
500.000 5.000.000
-
4.2.6
Workshop "BDC" di 15 Kab/Kota m/d m/d m/d pcs
-
225.000 250.000 300.000 50.000
-
-
225.000
-
-
225.000
-
-
225.000
-
-
225.000
-
-
-
250.000 300.000
-
-
250.000 300.000
-
-
250.000 300.000
-
-
250.000 300.000
-
-
-
50.000
-
-
50.000
-
-
50.000
-
-
50.000
-
- Kegiatan Lokakarya
m/d
-
225.000
- Press Conference - Nara Sumber
m/d m/d
-
250.000 300.000
- Kits Lokakarya
pcs
-
50.000
-
-
225.000 250.000 300.000 50.000
-
-
225.000 250.000 300.000 50.000
-
-
225.000 250.000 300.000 50.000
-
-
225.000 250.000 300.000 50.000
-
4.2. 4.2.1
- Kegiatan Lokakarya - Press Conference - Nara Sumber - Kits Lokakarya 4.2.7
683.700.000
680.160.000
-
680.160.000
3.540.000
Workshop Federasi UPK di 3 Kab/Kota
TOTAL SOCIAL ACTIVITY (BRIDGING)
889.400.000
872.570.000
-
872.570.000
16.830.000
352.000.000
288.074.000
-
288.074.000
63.926.000
BRIDGING PERIODE MEI up to DESEMBER 2015 1 1,1 a b c d 1,2
PROVINCIAL LEVELS Lokakarya Sosialisasi Kumuh Kegiatan Lokakarya Press Conference
m/d m/d
800 20
250.000 200.000
200.000.000 4.000.000
690 20
250.000 200.000
172.500.000 4.000.000
-
250.000 200.000
-
690 20
250.000 200.000
172.500.000 4.000.000
110 -
250.000 200.000
27.500.000 -
Nara Sumber Provinsi Kits Lokakarya
m/d Pc
12 500
500.000 50.000
6.000.000 25.000.000
10 500
500.000 50.000
5.000.000 25.000.000
-
500.000 50.000
-
10 500
500.000 50.000
5.000.000 25.000.000
2 -
500.000 50.000
1.000.000 -
40.000.000 4.000.000 5.000.000
141 8 100
250.000 500.000 50.000
35.074.000 4.000.000 5.000.000
-
250.000 500.000 50.000
-
141 8 100
250.000 500.000 50.000
35.074.000 4.000.000 5.000.000
19 -
250.000 500.000 50.000
4.926.000 -
5 4
1.000.000 7.500.000
5.000.000 32.500.000
-
1.000.000 7.500.000
-
5 4
1.000.000 7.500.000
5.000.000 32.500.000
3 4
1.000.000 7.500.000
3.000.000 27.500.000
Workshop Media
a b c
Kegiatan Workshop Narasumber Workshop Kits Workshop
m/d m/d Pc
160 8 100
250.000 500.000 50.000
1,3
Penulisan Artikel / Berita
time
8
1.000.000
8.000.000
1,4
TV Talkshow
time
8
7.500.000
60.000.000
2 2,1
2.777.500.000
CITY/REGENCY LEVELS Lokakarya Sosialisasi Kumuh - Kegiatan Lokakarya - Press Conference
m/d m/d
4.200 350
250.000 100.000
1.050.000.000 35.000.000
- Nara Sumber Provinsi
m/d
175
300.000
m/d
991.174.150
-
991.174.150
1.786.325.850
52.500.000
3.273 348 152
250.000 100.000 300.000
818.253.150 34.750.000 45.600.000
-
250.000 100.000 300.000
-
3.273 348 152
250.000 100.000 300.000
818.253.150 34.750.000 45.600.000
927 3 23
250.000 100.000 300.000
231.746.850 250.000 6.900.000
360
250.000
90.000.000
96
250.000
24.071.000
-
250.000
-
96
250.000
24.071.000
264
250.000
65.929.000
m/d
600
250.000
150.000.000
-
250.000
-
-
250.000
-
-
250.000
-
600
250.000
150.000.000
2,4 2,5 2,5
Workshop "BDC" di 15 Kab/Kota (OC1=3, OC2=5, OC3=2, OC4=5) Workshop Federasi UPK di 3 Kab/Kota (OC-1; OC-3 dan OC4) Lokakarya PLPBK Radio Talkshow Media Field Visit
m/d time time
4.200 140 70
250.000 500.000 500.000
1.050.000.000 70.000.000 35.000.000
-
250.000
-
-
250.000
-
-
250.000
-
4.200
250.000
1.050.000.000
35 30
500.000 500.000
17.500.000 15.000.000
-
500.000 500.000
-
35 30
500.000 500.000
17.500.000 15.000.000
105 40
500.000 500.000
52.500.000 20.000.000
2,6
Penulisan Berita
time
140
500.000
70.000.000
42
500.000
21.000.000
-
500.000
-
42
500.000
21.000.000
98
500.000
49.000.000
2,5
Exhibition
time
35
5.000.000
175.000.000
3
5.000.000
15.000.000
-
5.000.000
-
3
5.000.000
15.000.000
32
5.000.000
160.000.000
2,2 2,3
TOTAL SOCIAL ACTIVITY (BRIDGING)
3.129.500.000
1.279.248.150
-
1.279.248.150
TOTAL OF SOCIAL ACTIVITY
4.909.288.900
3.012.457.050
-
3.012.457.050
1.850.251.850 IV // 50 of 50 1.896.831.850