AMENDMENT NO. 7 TO THE CONTRACT (Dated August 25, 2016)
FOR NON-CONSULTING SERVICES TIME BASED
REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) – 2 IBRD Loan 8259-ID
BETWEEN
Directorate of Water Supply Development Directorate General of Human Settlements Ministry of Public Works and Public Housing AND
PT. Prismaita Cipta Kreasi In Joint Venture with
PT. Indomas Mulia PT. Disiplan Consult
Contract Number :KU.08.08/Kontrak/Pamsimas/316/XII/ 2013 Dated : December 27th, 2013
SUMMARY OF CONTRACT 1.
Loan No.
:
Loan IBRD 8259 ID (Third Water Supply and Sanitation for Low Income Communities-WSLIC3/ PAMSIMAS II)
2.
Name of Service Providers
:
PT. Prismaita Cipta Kreasi In Joint Venture with : PT. Indomas Mulia PT. Disiplan Consult
3.
Contract Original No. and Date :
KU.08.08/Kontrak/Pamsimas/316/XII/2013 Dated : December 27th, 2013 Dated : May 30th, 2014 Dated : November 27th, 2014 Dated : April 21st, 2015 Dated : December 1st, 2015 Dated : February 29th, 2016 Dated : August 25, 2016 Dated : August 25, 2016
Amendment No. 1 Amendment No. 2 Amendment No. 3 Amendment No. 4 Amendment No. 5 Amendment No. 6 Amendment No. 7
: : : : : : :
4.
Domicile/Address of Service Providers
:
5.
Value of Contract
:
Original Contract
:
IDR 30,668,230,000 (Include VAT 10% APBN Portion)
Amendment No. 1
:
IDR 33,001,942,500 (Include VAT 10% APBN Portion)
Amendment No. 2
:
IDR 37,224,554,210 (Include VAT 10% APBN Portion)
Amendment No. 3
:
IDR 37,224,554,210 (Include VAT 10% APBN Portion)
Amendment No. 4
:
IDR 37,224,554,210 (Include VAT 10% APBN Portion)
Amendment No. 5
:
IDR 37,224,554,210 (Include VAT 10% APBN Portion)
Amendment No. 6
:
IDR 37,224,554,210 (Include VAT 10% APBN Portion)
Amendment No. 7
:
IDR 43,776,830,614 (Include VAT 10% APBN Portion)
Perkantoran Grand Palace Blok K Lt. 3 Jl. Raya Pasar Minggu KM 16 – Jakarta Selatan Telephone 021-79170261
6.
Brief Description of Services
:
7.
Percentage Eligible for IBRD Financing Original Contract Amendment No. 1 Amendment No. 2 Amendment No. 3 Amendment No. 4 Amendment No. 5 Amendment No. 6 Amendment No. 7
:
Percentage Eligible for APBN-RM Financing Original Contract Amendment No. 1 Amendment No. 2 Amendment No. 3 Amendment No. 4 Amendment No. 5 Amendment No. 6 Amendment No. 7
:
Percentage Eligible for APBN-RM Financing (Non Sharing) Original Contract Amendment No. 1 Amendment No. 2 Amendment No. 3 Amendment No. 4 Amendment No. 5 Amendment No. 6 Amendment No. 7
:
8.
9.
: : : : : : : :
: : : : : : : :
: : : : : : : :
Provision of advisory services for the Provincial Project Management Unit and District Project Management Unit in the daily operation, management and implementation of CommunityBased Water Supply Project (PAMSIMAS II) in the Provinces of Bengkulu, Jambi, Bangka Belitung, South Sumatra and Lampung.
80 % Net of VAT 80 % Net of VAT 80 % Net of VAT 80 % Net of VAT 80 % Net of VAT 80 % Net of VAT 80 % Net of VAT 80 % Net of VAT
20 % Net of VAT 20 % Net of VAT 20 % Net of VAT 20 % Net of VAT 20 % Net of VAT 20 % Net of VAT 20 % Net of VAT 20 % Net of VAT
Nil 100 % Net of VAT 100 % Net of VAT 100 % Net of VAT 100 % Net of VAT 100 % Net of VAT 100 % Net of VAT 100 % Net of VAT
10. Amount Eligible for IBRD Financing Original Contract
: : IDR 24,069,200,000
(Net of VAT)
Amendment No. 1 Amendment No. 2 Amendment No. 3 Amendment No. 4 Amendment No. 5 Amendment No. 6 Amendment No. 7
: : : : : : :
11. Amount Eligible for APBN-RM Financing
:
IDR IDR IDR IDR IDR IDR IDR
24,069,200,000 27,191,248,400 27,191,248,400 27,497,892,400 27,497,892,400 27,497,892,400 32,660,983,227
(Net of VAT) (Net of VAT) (Net of VAT) (Net of VAT) (Net of VAT) (Net of VAT) (Net of VAT)
Original Contract
: IDR IDR
6,017,300,000 601,730,000
(Net of VAT) (VAT 10%)
Amendment No. 1
: IDR IDR
6,017,300,000 601,730,000
(Net of VAT) (VAT 10%)
Amendment No. 2
: IDR IDR
6,797,812,100 679,781,210
(Net of VAT) (VAT 10%)
Amendment No. 3
: IDR IDR
6,797,812,100 679,781,210
(Net of VAT) (VAT 10%)
Amendment No. 4
: IDR IDR
6,874,473,100 687,447,310
(Net of VAT) (VAT 10%)
Amendment No. 5
: IDR IDR
6,874,473,100 687,447,310
(Net of VAT) (VAT 10%)
Amendment No. 6
: IDR IDR
6,874,473,100 687,447,310
(Net of VAT) (VAT 10%)
Amendment No. 7
: IDR IDR
8,165,245,807 816,524,581
(Net of VAT) (VAT 10%)
12. Amount Eligible for TF Financing Original Contract
: : Nil
Amendment No. 1
: Nil
Amendment No. 2
: IDR
242,000,000
(Net of VAT)
Amendment No. 3
: IDR
242,000,000
(Net of VAT)
Amendment No. 4
: IDR
242,000,000
(Net of VAT)
Amendment No. 5
: IDR
242,000,000
(Net of VAT)
Amendment No. 6
: IDR
242,000,000
(Net of VAT)
Amendment No. 7
: IDR
242,000,000
(Net of VAT)
13. Amount Eligible for IDA Credit 4204-IND Original Contract
: : Nil
Amendment No. 1
: IDR
215,644,000
(Net of VAT)
Amendment No. 2
: IDR
215,644,000
(Net of VAT)
Amendment No. 3
: IDR
215,644,000
(Net of VAT)
Amendment No. 4
: IDR
215,644,000
(Net of VAT)
Amendment No. 5
: IDR
215,644,000
(Net of VAT)
Amendment No. 6
: IDR
215,644,000
(Net of VAT)
Amendment No. 7
: IDR
215,644,000
(Net of VAT)
14. Amount Eligible for APBN-RM Financing (Non Sharing)
:
Original Contract
: Nil
Amendment No. 1
: IDR IDR
1,907,335,000 190,733,500
(Net of VAT) (VAT 10%)
Amendment No. 2
: IDR IDR
1,907,335,000 190,733,500
(Net of VAT) (VAT 10%)
Amendment No. 3
: IDR IDR
1,907,335,000 190,733,500
(Net of VAT) (VAT 10%)
Amendment No. 4
: IDR IDR
1,524,030,000 183,067,400
(Net of VAT) (VAT 10%)
Amendment No. 5
: IDR IDR
1,524,030,000 183,067,400
(Net of VAT) (VAT 10%)
Amendment No. 6
: IDR IDR
1,524,030,000 183,067,400
(Net of VAT) (VAT 10%)
Amendment No. 7
: IDR IDR
1,524,030,000 152,403,000
(Net of VAT) (VAT 10%)
Table of Contents Section I FORM OF CONTRACT Section II GENERAL CONDITIONS OF CONTRACT ( No Change ) Section III SPECIAL CONDITIONS OF CONTRACT (Amended )
APPENDIX A DESCRIPTION OF SERVICES (Amended ) APPENDIX B PERSONNEL AND STAFFING SCHEDULE (Amended) APPENDIX C SUMMARY OF COST ESTIMATE (Amended ) APPENDIX D REMUNERATION AND REIMBURSABLE COST ESTIMATE (Amended ) APPENDIX E ADVANCE PAYMENT GUARANTEE ( No. Change ) APPENDIX F PERFORMANCE BANK GUARANTEE (Amended)
Section I FORM OF CONTRACT
AMENDMENT No 7 TO THE CONTRACT Dated August 25, 2016 REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) 2 IBRD Loan 8259-ID Contract Number :KU.08.08/Kontrak/Pamsimas/316/XII/ 2013 Dated : December 27th, 2013 This Contract Amendment No. 7 (hereinafter called “Amendment No. 7”) is made on Thursda 25 of the month of August 2016 between, on the one hand, Directorate of Water Supply Development, Directorate General of Human Settlements, Ministry of Public Works and public Housing, Government of Indonesia, (hereinafter called the “Employer”) and, on the other hand, a joint venture PT. Prismaita Cipta Kreasi consisting of the following entities, each of which will be jointly and severally liable to theEmployer for all the Service Provider obligations under this Contract, namely PT. Prismaita Cipta Kreasi Joint Venture With PT. Indomas Mulia and PT. Disiplan Consult (hereinafter called the “Service Provider”). WHEREAS
(a) the Bank had issued the NOL for PAMSIMAS III Facilitator Administration Services in ROMS, on June 30, 2016. (b) the Client had officially requested the Service Provider to submit the draft contract Amendment No. 7, with letter No. UM.01.01/PAMBM/VII/427A, dated July 1, 2016. (c) the Service Provider submit the draft contract amendment No. 7 with cover letter No. 268/PCK/VII/2016, dated July 11, 2016. (d) the Client had officially requested NOL the draft contract amendment No. 7, with letter Ref. No. UM.01.16/Ca/Pamsimas/293, dated August 15, 2016, Re. Request for NOL to the Draft Contract Amendment No. 7 of Regional Oversight Management Services (ROMS) - 2. (e) the Bank had issued the NOL upon the Draft of Contract Amendment No. 7 on August 25, 2016. (f) Pursuant to Clause 2.6 of the General Conditions of Contract, it is deemed necessary to legally administer the changes in the Form of Contract Amendment NOW THEREFORE the parties hereto hereby agree as follows:
The following documents attached hereto shall be deemed to form an integral part of this Contract: 1. 2.
The General Conditions of Contract (including Attachment 1 “Bank Policy – Corrupt and Fraudulent Practices); No Change The Special Conditions of Contract ; Amended
Section II GENERAL CONDITIONS OF CONTRACT (No Change)
Section III SPECIAL CONDITIONS OF CONTRACT (Change)
Section VIII. Special Conditions of Contract Number of GC Clause 2.3 Completion Date of Contract
Amendments of, and Supplements to, Clauses in the General Conditions of Contract Currently written as : The Intended Completion Date is 36 months from the Starting Date To be amended as : The Intended Completion Date is 38 months from the Starting Date
6.1 Cost Estimate; Ceiling Amount
Currently written as : The Ceiling in Local currency is : IDR 37,224,554,210 (Include VAT 10% APBN Portion); (thirty seven billion two hundred and twenty four million, five hundred fifty four thousand and two hundred and ten rupiahs) To be amended as : The Ceiling in Local currency is : IDR 43,776,830,614 (Include VAT 10% APBN Portion); (fourty three billion seven hundred and seventy six million, eight hundred and thirty thousand six hundred and fourteen rupiahs)
APPENDIX. A DESCRIPTION OF SERVICES
( Amended )
14
Section V. Description of Services REVISION TERMS OF REFERENCE FOR REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) to the PROVINCIAL PROJECT MANAGEMENT UNITS (PPMUs) and DISTRICT PROJECT MANAGEMENT UNITS (DPMUs) Community-Based Water Supply Project (PAMSIMAS II) Regional Oversight Management Services Province [ROMS-3] No. I. 1.
1
Amendment No. 7 PROJECT OBJECTIVES and Components PAMSIMAS1 is making a significant contribution to the Indonesian government’s efforts to improve local development. It is raising the economic and health status of poor income communities and speeding up the progress of achievement for Millennium Development Goals (MDGs). The project aim is to strengthen the local governments’ capacity to fulfill their responsibilities for improving access to water and sanitation for rural villages as well as to improve community hygiene behavior. The differences between this project and the earlier projects are the commitment of resources for nationwide advocacy and coalition-building efforts. It is also aligned with institutional incentives to support the mainstreaming and scaling up of the community-driven
No. I. 1.
Amendment No. 8 PROJECT OBJECTIVES and Components No Change
Remarks
PAMSIMAS abbreviated from “Penyediaan Air Minum dan Sanitasi Berbasis Masyarakat” or Third Water Supply for Low Income Communities (in English). The project commenced in 2008 with field implementation continuing through to 2013. Based on the success of implementation the project is being extended through additional financing to support implementation in some 5000 additional villages during the period from 2013 to 2016. The extension and expansion of the project is referred to as the Community-Based Water Supply Project (PAMSIMAS II).
15
No.
2
Amendment No. 7 development (CDD) approach to water supply and sanitation (WSS) at provincial, district and village levels, involving government, civil society and the private sector. PAMSIMAS is underpinned by a national policy for WSS which has strong and broad support from various stakeholders in the Government and the donor community. The Government is using PAMSIMAS as one of the implementation mechanisms for developing a framework to support this policy and there is a very high demand from communities and districts to join the program. The original objective of PAMSIMAS was:
No.
Amendment No. 8
2
No Change
3
No Change
4
No Change
Remarks
To increase the number of low-income rural and periurban populations accessing improved water and sanitation facilities and practicing improved hygiene behaviors as part of the Recipient’s efforts to achieve WSS-MDGs, through programmatic mainstreaming and scaling-up of a nationwide community-driven approach. 3
4
For PAMSIMAS II this has been revised slightly as follows to better reflect its support for two key national programs for water supply and sanitation improvement (refer Paragraph 5): To increase the number of under-served and low income rural and peri-urban populations accessing improved and sustained water and sanitation services and practicing improved hygiene behaviors as part of the Recipient’s efforts to achieve WSS-MDGs, through programmatic mainstreaming and scaling-up of a nationwide community-driven approach. Under the initial PAMSIMAS, the World Bank provided
16
No.
5
2
Amendment No. 7 an IDA credit and AusAID provided supporting grants to finance the implementation of PAMSIMAS project for the period from 2008 to 2012. The Closing Date for the Credit was recently extended to 31 December 2014 in order to facilitate the transition to PAMSIMAS II. On completion of the initial PAMSIMAS some 6,800 communities (compared to the originally planned 5,500 communities) in 15 provinces and 110 districts will have benefited from the project2. PAMSIMAS design. These are: Under a proposed extension (PAMSIMAS II) additional financing will be provided through an IBRD loan supported by an AusAID grant to scale-up the project and enhance the development impact. PAMSIMAS II will further support Indonesia’s MDG achievement efforts. In broad terms PAMSIMAS II will support the implementation of the Government’s CDD strategy for improving WSS facilities and services and the improvement in environmental health and hygiene behavior in at least 5000 new villages across 32 provinces and in excess of 220 districts. The proposed scaling-up is consistent with the Government’s MDG strategy and is planned to support two key government programs which have been introduced since the original Program Air Bersih Untuk Rakyat (Water for All) of the Ministry of Public Works and Public Housing is one of six new programs introduced in early 2011 under an overarching program of interventions focused on poor and disadvantaged sectors of the population. The overall
No.
5
Amendment No. 8
Remarks
No Change
No Change
The total village numbers include the replication villages funded by local government.
17
No.
Amendment No. 7 program (Program Pro Rakyat) is being implemented under the guidance of the Vice President, and the overall management of the Coordinating Minister for the Coordinating Minister for the Economy. The Minister of Public Works has direct responsibility for Program Air Bersih Untuk Rakyat but is supported by other relevant Ministers.
No.
7
PAMSIMAS II extends the provincial eligibility for PAMSIMAS nationwide excluding Jakarta. However district inclusion will be based on criteria including local government commitment and willingness to participate, its capacity to sustain a multi-year investment program. A list of participating provinces and districts is contained in Annex D The lead executing agency (EA) for PAMSIMAS is the Directorate General for Human Settlements (DGCK or Cipta Karya) within the Ministry of Public Works and Public Housing. The Directorate General for Disease Control and Environmental Health (DGDCEH) within the Ministry of Health (MOH), the Directorate General for Regional Development (DGRD) and the Directorate General for Village and Community Empowerment (DGVCE) within the Ministry of Home Affairs (MOHA) will support DGCK as implementing agencies for the project. A Central Project Management Unit (CPMU) will be established to be responsible for day to
Remarks
No Change
Sanitasi Total Berbasis Masyarakat (STBM) program in accordance with the Ministerial Decree of the Minister of Health, Republic of Indonesia No 852/Menkes/SK/IX/2008, dated 9 September 2008. 6
Amendment No. 8
6
No Change
7
No Change
18
No.
8
9
10
Amendment No. 7 day implementation of the project. In the participating provinces and districts, Provincial Project Management Units and District Project Management Units will also be established with responsibility to day to day implementation in their respective provinces and districts. An experienced consultant team, the Central Management Advisory Consultant (CMAC) will support the Government at the central level in implementing the project. Regional, provincial and district level oversight technical assistance and facilitation services will also be provided to support communities, districts and provinces during implementation. Technical support for the participating provinces and districts will be provided by the regionally structured Oversight Management Services provider appointed in seven regions with responsibility for providing a range of implementation technical support services including capacity building and training, coordination and management support in their respective provinces and districts. PAMSIMAS II will be implemented under 5 components as follows. Component 1 : Community Empowerment and Sustained Local Institutional Development
No.
Amendment No. 8
8
No Change
9
No Change
10
No Change
Remarks
Component 2 : Sustained Improvement in Hygiene and Sanitation Behavior and Services Component 3 : Sustained Water Supply and Institutional Sanitation Infrastructure 19
No.
Amendment No. 7 Component 4 : District and Village Incentive Grants
No.
Amendment No. 8
Remarks
Component 5 : Implementation Support and Project Management. 11
12
While the components are substantially unchanged from the original PAMSIMAS, there are changes of detail to accommodate changes in Government policies and programs and to take account of the five years of implementation experience with PAMSIMAS to date. A description of the project components for PAMSIMAS II and a summary of the key changes is contained in Annex A. An important change is the introduction of additional access “windows” for village grants under Component 3 which will allocate some of the village grant funds to expansion of existing WSS systems and for optimization of existing WSS systems to restore their capacity. The progress of the project implementation, including progress towards the capacity building and sustainability aspects, shall be monitored and evaluated by using the key performance indicators as summarized in Annex B. Note that Annex B includes Key Performance Indicators (KPI) for the original PAMSIMAS Credit (PAMSIMAS I) as well as for PAMSIMAS II. The ROMS responsibilities will be closely related to the KPI for PAMSIMAS II as appropriate to their respective regions. The details in Annex B are for general information. Detailed and updated information on KPIs will be contained in project guidelines as updated from time to time and are available on the PAMSIMAS website.
11
No Change
12
No Change
20
No. II. 13
14
15
Amendment No. 7 PROJECT IMPLEMENTATION ARRANGEMENTS The project implementation arrangements for PAMSIMAS are evolving based on lessons learned from implementation experience with PAMSIMAS I and refinements in government policy and procedures. The details provided below summarize the current implementation arrangements and some of the anticipated changes for PAMSIMAS II but the ROMS service provider should refer to the key project guidelines and related documentation for further details and changes that may occur from time to time in future. The implementation of PAMSIMAS II will involve the close cooperation of a range of local government agencies at the central, provincial, district, and village level, civil society organizations and village stakeholders. Strengthening government coordination and improving linkages between the different stakeholders is critical for effective programmatic implementation for scaling up and mainstreaming water sanitation and health (WSH). PAMSIMAS II will assist each group to understand its roles and responsibilities within the sector and support capacity building for managing local WSH investments after the project ends. Changes to PAMSIMAS II to align with key government programs improving access to water and sanitation services and achievement of the MDGs mean that PAMSIMAS II will not explicitly target poor communities. However the implementation approach has and will continue to ensure that poor community
No. II.
Amendment No. 8
13
PROJECT IMPLEMENTATION ARRANGEMENTS No Change
14
No Change
15
No Change
Remarks
21
No.
16
Amendment No. 7 members and marginalized groups will benefit from affordable, sustainable and readily accessible water supply and sanitation facilities and services in the target areas. PAMSIMAS will be judged by the degree to which poor community members and marginalized groups have and ability to contribute to implementation and ongoing maintenance through providing a minimum of 20% of the total cost (in cash and in kind). After selection, each village will develop a Community Action Plan (CAP) for water supply and institutional sanitation and community management using a gender and poverty focused planning process facilitated by trained community facilitators (CFs) received sustainable benefits from the project. Communities will express their interest in participation in the project and show their willingness supported by village WSS volunteers (Kader AMPL). The CFs are supported by district, provincial and regional Oversight Management Services (ROMS) technical support teams, project implementation units and related government agencies to ensure the quality of the community process. Approval of the CAPS will be done by an evaluation team at the district level comprising of government and civil society representatives which is also responsible for other key decisions including village selection and the allocation of budget to individual villages. Village level community sanitation will be addressed through an innovative approach called Community Based Total Sanitation (Sanitasi Total Berbasis Masyarakat or STBM). STBM will be implemented as a district wide program under the day to day management
No.
16
Amendment No. 8
Remarks
No Change
22
No.
17
18
Amendment No. 7 of the local Health Office (Dinas Kesehatan) working through its existing resources at the district, subdistrict and village levels. The local Health Office will be supported by an STBM District Facilitator whose role will be to support local resources and build local capacity to plan and implement STBM as a district wide ongoing program. The project will be implemented by the central government working in partnership with local government in the provinces and districts. The central executing agency (EA) will be the DGCK (Human Settlements/Cipta Karya), Ministry of Public Works and Public Housing (MPW and PH). Other implementing agencies (IAs) of the central government will be: the DGDCEH (Diseases Control and Environmental Health), Ministry of Health (MOH); DGRD (Regional Development) and DG VCE (Village and Community Empowerment), both within the Ministry of Home Affairs (MOHA); and DGPSE (Primary and Secondary Education within the Ministry of National Education (MONE). The management of the project will be facilitated through structural and operational units at each level. The structural units consist of the central, provincial, district and subdistrict units representing the sectoral responsibilities of the Ministries of Public Works, Health and Public Housing, Home Affairs and Education, and
No.
Amendment No. 8
17
No Change
18
No Change
Remarks
23
No.
19
20
Amendment No. 7 are represented by the Coordination Teams or POKJA AMPL3 at each level of Government as shown in Annex C. The operational units consist of the central, provincial, and district Project Management Units (PMUs) established for project implementation which are responsible for day to day management, budgeting, financial administration, monitoring and reporting. These units will have representation from the central, provincial and district units responsible for the functions of the implementing agencies. A central level Project Management Unit (CPMU) will oversee the project implementation in all provinces. The CPMU will be supported by a Central Steering Committee (SC) providing strategic policy advice, and a Central Technical Team (TT) and Working Group (WG) providing operational policy, guidance, coordination and supervision. The SC, TT and WG shall consist of echelon representatives from MOH, MOHA, Ministry of Finance (MOF), MPW, MONE, BAPPENAS, and other relevant national agencies, that set the policy direction for, and provide technical guidance to, the project. The CPMU, under the direct supervision of the DGCK, MPW, will be responsible for overall project management, coordination and financial management. The CPMU will also be supported by Provincial and District Project Management Units (PPMUs and DPMUs) at their respective levels. The CPMU comprises of GOI staff from Executing and
No.
Amendment No. 8
19
No Change
20
No Change
Remarks
3
For PAMSIMAS II it is proposed that the POKJA AMPL formally take the role of of overall responsibility for management of the project in the participating provinces and districts. The POKJA comprises the same agencies as the Coordination teams (TKP & TKK) but is more appropriate in terms of the long term sustainable sector management role in local government that PAMSIMAS will support.
24
No.
21
Amendment No. 7 Implementing Agencies under the management of the Head of the CPMU and a GOI Project Manager from the EA. With the support of the Central Management Advisory Consultant (CMAC) CPMU will provide capacity building support, training, supervision and monitoring of the project implementation performance primarily at the province, district, and below. The CMAC team will comprise a Project Team Leader and senior technical and management experts covering the range of disciplines and skills required to support successful implementation. The CMAC is based at and has its resources located at the central level. It is primarily responsible for providing quality technical assistance in the areas of water and sanitation engineering, participatory community development, community and school health and hygiene promotion, gender mainstreaming, capacity building, project monitoring and evaluation, management information systems, financial planning and management, project accounting, audit, procurement, complaints management and media and communications. Their main counterparts will include the CPMU, SC and TT (in particular in each IA) at the central level. The CMAC will also coordinate with the PPMU and DPMUs as well as the Coordination and Technical teams in the respective provinces and districts. The CMAC will work closely with the technical teams engaged to directly support the implementation at the provincial and particularly the district level and with a number of specialist advisers (firms and individuals) who will be appointed to provide direct support to the
No.
21
Amendment No. 8
Remarks
No Change
25
No.
Amendment No. 7 executing and implementing agencies in their management of, and participation in, the project. These include the following: (a) A Training and Development Services (TDS) team will be appointed at the central level. The TDS will have overall responsibility for the planning, design, and implementation of training and capacity building activities across the project as a whole. The TDS will be directly responsible for delivery of training and capacity building events at the central level. In the regions, provinces and districts, while the direct responsibility for training delivery will rest with the ROMS, it will utilize programs, curricula, modules and training materials developed by the TDS. The TDS will also be responsible for monitoring and evaluating training undertaken by the ROMS. The key training resource persons for training implementation both centrally and in the regions, will be drawn where possible from the technical teams including the CMAC and the ROMS whose teams will include key personnel with training qualifications and experience. The TDS will also manage a number of individual advisers to be appointed to provide direct support to the EA and key IAs. (b) Regional Oversight Management Services teams will be established in each of the seven project regions and the participating provinces and districts to provide technical and project management and M&E support, capacity building, and quality
No.
Amendment No. 8
Remarks
No Change
No Change
26
No.
Amendment No. 7 assurance for field implementation activities. These teams will be contracted centrally but will be responsible to the provinces and districts in providing technical assistance in their respective regions. The ROMS teams will include resources at the regional, provincial and district level. The regional teams will focus on capacity building and training and will coordinate closely with the CMAC and report to the CPMU. The provincial teams will focus on implementation coordination between participating districts, as well as supporting capacity building and training, reporting to their respective PPMU. The district level team will provide implementation support for the CFs and coordinate with the various stakeholders in their respective districts, reporting to their respective DPMU. The nature of Regional Oversight Management Services contract is a Non-Consultant Services contract wherein the ROMS teams provide suitably skilled personnel to carry out the work in defined circumstances, laid down in recognised standards, codes of practice and guidelines prepared by the CMAC. The activities use only well-defined resources including personnel, equipment, materials, information and technologies. (c) A community facilitation team will be established in each participating district. The district CF team will generally comprise one senior community facilitator and four community facilitators of whom two will have qualifications, skills and experience in water
No.
Amendment No. 8
Remarks
No Change
27
No.
Amendment No. 7 supply and sanitation engineering, and two will have qualifications, skills and experience in community empowerment. The CFs will be contracted under seven regional packages, and will be contractually responsible to their assigned provinces, and report to the DPMUs in their assigned districts. The focus of the CFs will be to support Village Implementation Teams (VIT or KKM) with the planning and implementation of their CAPS and building community capacity initially for planning and implementation and subsequently for the sustainable operation and maintenance of the WSS facilities and services in the target villages. The senior facilitator will support the other community facilitators in their tasks, provide mentoring and on the job training. He/she will also have an increased responsibility for strengthening district stakeholder capacity to support sustainable management of community based WSS facilities and services.
No.
(d) District level STBM Facilitators will be recruited under separate contracts at the central level. The STBM Facilitators will be allocated one to each district to support the districts in building capacity for the implementation of district wide STBM program implementation. They will work directly with the local Health Office (Dinas Kesehatan) and will coordinate with the DPMUs through the ROMS District Coordinator. 22
The CF team is expected to support planning and
Amendment No. 8
Remarks
No Change
22
No Change 28
No.
23
24
25
Amendment No. 7 implementation in about 8-10 new village sub-projects at community level each year although this will vary according to a number of factors including the scale and nature of the CAP intervention, the capacity of the communities, logistical issues (transport, remoteness etc.) and the experience and capacity of the CFs themselves. CFs will be provided with extensive initial training and routine follow refresher/follow-up training according to project requirements. Mentoring will be provided by district and provincial level ROMS team members as well as the senior facilitator. At the village level there will be elected representation of Village Implementation Teams (VIT or KKM) which are responsible for managing sub-project implementation and receiving and managing village grants authorized by the EA. Coordination of the VITs will be provided by a sub-district coordination team under control of the Head for Sub-district Development and the Sanitarian. In PAMSIMAS II additional village level resources, namely village water supply and sanitation volunteers (Kader AMPL), will support the VIT through the CAP process. The project has established guidelines which detail the implementation arrangements at all levels. The key guidelines include the following documents which are and will be supported by numerous supporting documents covering various aspects of project management and implementation. (a) General project implementation guideline (“Pedoman Umum Pelaksanaan” or “Project
No.
Amendment No. 8
23
No Change
24
No Change
25
No Change
Remarks
29
No.
Amendment No. 7 Management Manual” or PMM);
No.
Amendment No. 8
Remarks
(b) Community level implementation guideline (“Petunjuk Pelaksanaan PAMSIMAS di Tingkat Masyarakat” or “Village Implementation Manual” or VIM); and (c) Standard Operating Procedures (SOP). 26
III. 27
28
IV. 29
These key documents will require revision to incorporate the specific requirements of PAMSIMAS II. These amendments are expected to be completed in advance of ROMS mobilization under this assignment. A full list of key guidelines and related documents is contained in Annex I. PROJECT LOCATIONs and ROMS PACKAGING The Project will be implemented in the provinces and districts as detailed in Annex D. These locations may change prior to and during implementation although it is expected that selected districts will participate over a minimum of 3 years (PAMSIMAS I & II). The first year implementation is likely to be slower with an increased focus on former PAMSIMAS I locations. The project implementation arrangements are structured under seven regions as outlined in Annex E. Each region, comprising up to 6 provinces and between 1 and 49 districts, will be supported by a single ROMS package. OBJECTIVES OF THE SERVICES This TOR covers the services to be provided by the Regional ROMS provider for the region nominated above.
26
No Change
III. 27
PROJECT LOCATIONs and ROMS PACKAGING No Change
28
No Change
IV. 29
OBJECTIVES OF THE SERVICES No Change
30
No. 30
31
32
Amendment No. 7 The key objectives of the ROMS are to support the PPMUs and DPMUs through the provision of technical support principally in the following key areas: (a) day to day management of project implementation including budgeting and financial administration; (b) technical support to manage, supervise, monitor and mentor the community facilitators (CFs) in the implementation of community‐driven processes, to facilitate community empowerment and institution building at the villagelevel; (c) institutional capacity building for local government including local government advocacy to institutionalize community driven water supply and sanitation with a focus on enhanced social inclusion, environmental safeguards, monitoring of implementation and sustainability of outcomes; (d) technical, financial and project M&E reporting at the provincial and district levels, and (e) adhoc support to central agencies and consultants with field supervision and monitoring activities in the respective regions. The ROMS has a key responsibility for the optimal achievement of the project goals, objectives and outputs particularly through the performance of the project activities at the village and district levels in their respective region. The ROMS responsibilities will be closely related to the KPI for PAMSIMAS II at the national level as set out in Annex B adjusted appropriately for their respective region. The ROMS will coordinate with, receive technical support from, and be monitored by the CMAC in respect of the achievements of KPIs for its respective region. While the TDS will have the key responsibility for
No. 30
Amendment No. 8 No Change
31
No Change
32
No Change
Remarks
31
No.
V. 33
Amendment No. 7 planning and development of training and capacity building across the project as a whole as well as for some direct delivery of training and capacity building services at the central level, the ROMS providers will be responsible for delivery of training and capacity building activities within their respective regions. The ROMS will provide support to the TDS in the overall planning of training and capacity building, contributing substantially to the development of training programs and materials. The ROMS team members will participate as the primary trainers and resource persons in the delivery of training in their specialized areas of expertise. The key training and capacity building events and the requirements for ROMS participation are detailed in Annex F, Annex L, and Annex M SCOPE OF SERVICES The detailed scope of services for ROMS will include the following. The ROMS will work to strengthen the capacity of local government for mainstreaming communitydriven water supply and sanitation into the local government planning process in order to encourage increased local budgets for this purpose. The ROMS will also be responsible as an administration support services for the cost of “Basic Program and Pilot Program” to District SPAMS Association. Terms of Reference and Estimate Fund for District Rural SPANS Association are detail in Annex N. The ROMS will also be responsible for administrative support services for the establishment of District Pokja AMPL/Sanitasi, DPMUs and District
No.
V. 33
Amendment No. 8
Remarks
SCOPE OF SERVICES No Change No Change
32
No.
Amendment No. 7 Partnership Committee (Pakem Kabupaten) in New District Pamsimas III are mentoring period in January 2016 up to May 2016 are detail in Annex P. The ROMS will also be responsible for technical support services to District Partnership Committee (Pakem Kabupaten) in New District Pamsimas III for the selection of target villges for the period betwent June, July and Mid-August 2016 as detailed in Annex Q. The ROMS will supply the required expertise responsible for ensuring overall performance of the program, by providing technical support to the PPMUs, DPMUs and technical teams in implementing the project components in their respective areas, and in carrying out the general project management and monitoring at province, district and village levels in accordance with the overall approach and detailed methodologies set out in the project guidelines. These guidelines include the use of MPA/PHAST and STBM as key approaches/methodologies for project implementation. Provide sufficient technical support to ensure implemetation of a range of activities including: (a) supporting and supervising the CFs; (b) undertaking community and institutional capacity building, training, coaching, mentoring, and conducting workshops as required; (c) providing technical support to the CFs in preparing the detailed designs for the CAPs and in their subsequent implementation; (d) M&E/MIS implementation at the respective levels in according with procedures
No.
Amendment No. 8
Remarks
No Change
33
No.
Amendment No. 7 established in the project operation and management manual and the system developed by the CMAC for project monitoring, evaluation and reporting and v) financial and technical management support to DPMUs and PPMU. The ROMS will be responsible for ensuring quality of recruited facilitators. The ROMS will coordinate with the Satker/Satuan Non Vertikal Tertentu (SNVT) Pengembangan Kinerja Pengelola Air Minum Propinsi to verify the long list and provide recommendations and clearance to the short list of prequalified facilitators. The ROMS will also be responsible as an administration support services for the payment of salaries and operational costs of facilitators [FK and FM] four (4) months implementation in 2014 (January – April). The ROMS will release the payment of salaries and the operational cost of the facilitator based upon the individual contract between the Facilitator and Satker Pembinaan Pamsimas//Satuan Non Vertikal Tertentu (SNVT)
The ROMS will be directly responsible for the delivery of training in their respective regions in accordance with agreed annual plans, with strategic
No.
Amendment No. 8
Remarks
The ROMS will be responsible for ensuring quality of recruited facilitators. The ROMS will coordinate with the Satker/Satuan Non Vertikal Tertentu (SNVT) Pengembangan Kinerja Pengelola Air Minum Propinsi to verify the long list and provide recommendations and clearance to the short list of prequalified facilitators. The ROMS will also be responsible as an administration support services for the payment of salaries and operational costs of facilitators [FK and FM] four (4) months implementation in 2014 (January – April). The ROMS will release the payment of salaries and the operational cost of the facilitator based upon the individual contract between the Facilitator and Satker Pembinaan Pamsimas//Satuan Non Vertikal Tertentu (SNVT). The ROMS will also be responsible as an administration support services for the payment of salaries and operational costs of facilitators [SF and FM] two (2) months implementation in 2016 (AugustSeptember). The ROMS will release the payment of salaries and the operational cost of the facilitator based upon the individual contract between the Facilitator and Satker Pembinaan Pamsimas//Satuan Non Vertikal Tertentu (SNVT) as detailed TOR in Annex R. No Change
Additional Scope for ROMS: Administration support for the payment of salaries and operational costs of facilitators [SF and FM] two (2) months implementation
34
No.
Amendment No. 7 planning support from the TDS. The ROMS will provide the required trainers and resource persons largely from within its team. The anticipated training and capacity building requirements and the specific ROMS resource requirements are detailed in Annex F, Annex L, and M. The ROMS team will support the central TDS in assessing training needs, and developing strategic plans and programs for training and capacity building activities for CFs and other stakeholders at the district and provincial level as required for effective implementation of the overall project. Periodic site visits will be required to participating villages within the project area for several purposes such as; dissemination of information including project guidelines, capacity building through direct coaching of the CFs, field observation, spot checking independently by the ROMS team as specified in Annex G, direct technical assistance, facilitation, and project implementation reviews including support for central level project personnel and consultants and World Bank missions.
No.
Amendment No. 8
Remarks
No Change
Regional team shall also periodic visits to province/ district/village, Out of spot checking Province team visits to districts/village and District team visits to communities in field supervision and monitoring, the quality control implementation processes and performance. The ROMS District team will work in close
No Change 35
No.
Amendment No. 7 coordination with their counterparts (PPMUs and DPMUs) and the respective coordination and technical teams and other related sector agencies at the provincial and district levels.
No.
Amendment No. 8
The ROMS team will support the CFs in the preparation of CAPs for target villages for each Fiscal Year as advised by the DPMUs. This will include the CAP preparation process, selection & establishment village implementation team, site survey & investigation, detailed engineering design (DED), cost estimates, community construction activities, operation and maintenance, and hygiene/behavior change in accordance with the CAPs and village agreements (SPPBs) and in line with the PMM and VIM.
No Change
The ROMS will support the facilitators and particularly the senior facilitator with the implementation of the sustainability phase of PAMSIMAS including the establishment of the Association of Village Management Organizations (SPAMS Perdesaan) at district level including participation in related workshops and training at district and provincial levels.
No Change
The ROMS shall ensure the timely printing and distribution of the socialization media including posters, leaflets and banners for the community and other stake holders. The ROMS will monitor the use of this media at the village level to ensure that the poster, leaflets and banners are appropriately
No Change
Remarks
36
No.
Amendment No. 7 displayed in prominent places and positions in full view of the general community.
No.
The ROMS shall provide project implementation reports periodically and timely as detailed in Annex H of this TOR. The ROMS will also update the information of the progress and achievement of the program in the PAMSIMAS website, including any complaints and resolution reached related to the project implementation. The systems and procedures for updating PAMSIMAS website will be provided by the CPMU and the CMAC.
Remarks
No Change
VI. 34
PERIOD OF SERVICES The ROMS services under this contract will cover PAMSIMAS II implementation during the period 2013 to 2016. There may be some follow-up activities required in the provinces and districts included in the original PAMSIMAS (PAMSIMAS I) but not included in PAMSIMAS II. It is expected that some members of the ROMS team will continue their engagement during the midle quarter of 2016 to support the CPMU and CMAC with end of project management and financial reporting. The overall assignment duration will therefore be about 36 months depending on the actual mobilization date.
VI. 34
V.
CONSULTANTS INPUTS AND WORKING ARRANGEMENTS The Regional ROMS teams will be contracted by the Satker Pembinaan Pamsimas but at the provincial and district level will work under the daily direction of the
V.
35
Amendment No. 8
35
PERIOD OF SERVICES The ROMS services under this contract will cover PAMSIMAS II implementation during the period 2013 to 2016. There may be some follow-up activities required in the provinces and districts included in the original PAMSIMAS (PAMSIMAS I) but not included in PAMSIMAS II and bridging of implementation PAMSIMAS III (including new district of 2016). It is expected that some members of the ROMS team will continue their engagement during the end quarter of 2016 to support the CPMU and CMAC with end of project management and financial reporting. The overall assignment duration will therefore be about 39 months depending on the actual mobilization date. CONSULTANTS INPUTS AND WORKING ARRANGEMENTS No Change
Additional Scope for ROMS: Extension period of services ROMS for three months (SeptemberNovember, 2016)
37
No. 36
37
Amendment No. 7 PPMUs and DPMUs respectively. The ROMS Team will include the key professional and support positions as set out in Table 1. The total number of positions and the total input is will be dependent on the region and in particular on the number of participating provinces and districts as well as the duration of their participation. The total input is indicative and will vary depending on the actual starting date of the services for each position, to be determined during the technical clarification and financial negotiation. Table 1, indicates that the ROMS is structured with a regional management group under the direction of a Project Manager. It is expected that the regional management team will be based in one of the provincial cities to be selected based on the most favorable logistics. The team will be co-located with the provincial team in that province. The regional team will include a Local Government Specialist (LGS) who will support local government capacity building focused on a sustainable community WSS sector in the respective provinces and districts. The regional Health and Sanitation Specialist will coordinate with the Dinas Kesehatan in the participating provinces and districts in relation to all aspects of Component 2 implementation. The Training Coordinator will be responsible for the detailed planning and implementation coordination for a wide range of capacity building and training events at all levels from the province to the participating communities, supported as required by members of the ROMS team at the various levels. Other members of the
No.
Amendment No. 8
36
No Change
37
No Change
Remarks
38
No.
38
Amendment No. 7 ROMS team will participate in training and capacity building as trainers and resource persons in their areas of expertise. Administrative support will be provided by an Office Manager and a Data Management Specialist will support the regional team in the data collection, verification and MIS use at the regional level. At the provincial level a Provincial Coordinator will have overall responsibility for supporting the PPMU with its implementation and capacity building coordination role in support of the participating districts. The Provincial Coordinator will be supported by a Quality Assurance Specialist who will be from a WSS technical background and a Financial Management Specialist.
39 1
Key Professional Positions [6] Regional Level
R1.
R2. R3. R4.
Project Manager (PM) [TA-A/B+] Data Management Specialist (DMS) Local Government Specialist (LGS) Training Co-ordinator (TC) [T-A]
R5.
Office Manager (OM)
R6.
Supporting Staff / Operator Computer Provincial Level
Table 1: ROMS Team Composition Input No. of Reports to (personPersons months) Per Per Reports to Region/ Region/ Package Package CPMU/PPMUs [1]; Project Director [2]
No.
38
Amendment No. 8
No Change
39 1
36
R1.
PM
1
36
R2.
PM
1
36
R3.
PM
1
36
R4.
PM
1
36
R5. R6.
1
23
Per Province
Per Province
Key Professional Positions [6] Regional Level
1
PM
Remarks
Project Manager (PM) [TA-A/B+]
Table 2: ROMS Team Composition Input No. of Reports to (personPersons months) Per Per Reports to Region/ Region/ Package Package CPMU/PPMUs [1]; Project Director [2]
1
39
PM
1
39
PM
1
39
PM
1
39
Office Manager (OM)
PM
1
39
Supporting Staff / Operator Computer
PM
1
26
Per Province
Per Province
Data Management Specialist (DMS) Local Government Specialist (LGS) Training Co-ordinator (TC) [T-A]
Provincial Level
Additional Scope for ROMS: Extension period of services ROMS for three months (SeptemberNovember, 2016) and New District Level (2016, Pamsimas III) three months (SeptemberNovember, 39
No.
Amendment No. 7 P1. P2. P3. P4. P5. P6.
Provincial Coordinator (PC) [T-A/B+] Quality Assurance (QAS) [T-A/B+] Financial Management Specialist (PFMS) [TA/B] Assistant Administration / Sekretary Assistant Provincial Coordinator (APC) -[TB-/C] Office Boy
D2. D3.
District Coordinator (DC) [T-B-/C] Financial Management Assistant (DFMA) Data Entry Operator / Administration Officer (DEAO) TOTAL
Amendment No. 8
PPMUs [1] PM [2]
1
36
P1.
PC
1
36
P2.
PC
1
36
P3.
PC
1
23
P4.
PC
1
23
P5.
PC
1
23
P6.
Per District
Per District
DPMUs [1] PC [2]
1
36
D1.
DC
1
36
D2.
DC
1
36
D3.
[4]
[5]
District Level D1.
No.
Notes: [1] Routine project reporting. [2] Contractual management reporting. [3] Total number of personnel will vary by Package/Region depending on the number of provinces and districts in each Region. Refer Annexes D & E. [4] Total input will vary by Package/Region depending on the number of provinces and districts in each Region, as well as the agreed start and finish dates for each position. Refer Annexes D & E. [5] [T-A], [T-A/B] or [T-B/C]: These positions are required to have PAMSIMAS training certification levels A, B or C as indicated. Where multiple levels are indicated the certification is expected to be upgraded to the higher level
Provincial Coordinator (PC) [T-A/B+] Quality Assurance (QAS) [T-A/B+] Financial Management Specialist (PFMS) [TA/B] Assistant Administration / Sekretary Assistant Provincial Coordinator (APC) -[TB-/C] Office Boy
PPMUs [1] PM [2]
1
39
PC
1
39
PC
1
39
PC
1
26
PC
1
26
PC
1
26
Per District
Per District
DPMUs [1] PC [2]
1
39
DC
1
39
DC
1
39
DPMUs [1] PC [2]
1
3
DC
1
3
[4]
[5]
Old District Level District Coordinator (DC) [T-B-/C] Financial Management Assistant (DFMA) Data Entry Operator / Administration Officer (DEAO)
Remarks 2016)
New District Level (2016) D4. D5.
District Coordinator (DC) [T-B-/C] Data Entry Operator / Administration Officer (DEAO) TOTAL
Notes: [1] Routine project reporting. [2] Contractual management reporting. [3] Total number of personnel will vary by Package/Region depending on the number of provinces and districts in each Region. Refer Annexes D & E. [4] Total input will vary by Package/Region depending on the number of provinces and districts in each Region, as well as
40
No.
Amendment No. 7
No.
Amendment No. 8
within the first year of the assignment. [5]
40
41
42
VII. 43
The ROMS firm will appoint a Project Director and/or Project Coordinator to be responsible to the contractual relationship between the firm and the CPMU including all contract administration activities. This position is considered to be an overhead of the firm and will not be remunerated under the contract. Periodic site visits will be required for the key professionals within the ROMS team. This will include visits to provinces, district and villages for coordination, supervision and quality assurance, monitoring and evaluation, capacity building, technical advice, mentoring, and participation in meetings, seminars and workshops. ROMS Team at Regional, Province and District level will accopy office themselves, external to offece PPMUs and DPMUs. CONSULTANT PERFORMANCE EVALUATION The performance of the ROMS team as a whole will be subject to routine evaluation by the PPMU in consultation with the CPMU on an annual basis. The continuation of the contract will be based on the annual performance evaluation of CPMU which may recommend changes to the team structure and/or personnel or termination of the contract in the case of unacceptable performance. The CPMU assisted by the
40
No Change
41
No Change
42
No Change
VII. 43
Remarks
the agreed start and finish dates for each position. Refer Annexes D & E. [T-A], [T-A/B] or [T-B/C]: These positions are required to have PAMSIMAS training certification levels A, B or C as indicated. Where multiple levels are indicated the certification is expected to be upgraded to the higher level within the first year of the assignment.
CONSULTANT PERFORMANCE EVALUATION No Change
41
No.
Amendment No. 7 No. Amendment No. 8 CMAC will develop a system (forms and procedures) for overall performance assessment which will be made available to the PPMUs and the ROMS firm. The ROMS is required to undertake an annual review of its individual team members as well as the CFs working in the respective districts and report the outcomes to the PPMUs after counseling the individual team members. 44 Additionally, the ROMS will arrange for the evaluation 44 No Change of the performance of STBM Facilitators by the respective district health office, and report the outcomes to the PPMUs. VIII. DETAILED TASKS FOR ROMS TEAM VIII. DETAILED TASKS FOR ROMS TEAM MEMBERS MEMBERS 45 The specific terms of reference for the key ROMS team 45 No Change members are set out in below. 46 While each of the team members has specific 46 No Change responsibilities, the successful implementation of the assignment will require close coordination within the team at and between the various levels. In addition the ROMS team must develop close working relationships with the PPMUs, DPMUs and the Coordination and Technical teams at each level. It is also critically important to establish strong working relationships with the regular CFs and the senior facilitators at the district level to ensure a coordinated approach at the district level. Key ROMS team members should have well developed planning and management skills as well as good conflict management and communication skills. 47 ROMS team members will be required to undertake 47 No Change substantial field travel (particularly between regional, provincial, district, sub-district and village levels) to
Remarks
42
No.
Amendment No. 7 undertake a variety of activities including routine supervision, monitoring and evaluation, technical and facilitation support, mentoring, training and capacity building.
IX 48
49
X 50
No.
Amendment No. 8
Remarks
IX TECHNICAL, ADMINISTRATIVE AND LOGISTICAL SUPPORT The ROMS team as detailed in Table 1 includes the technical and administrative resources required to enable it to operate effectively and efficiently in providing the services. To support the ROMS activities at central and in the field, the Provider is expected to make available all necessary equipment including but not limited to: (a) transport facilities; and (b) computers, printers and other essential office equipment. Minimum transport requirements for the centrally based team are considered to be two high occupancy vehicles (SUV or similar). Provision for equipment shall include all costs for driver and other operation and maintenance commensurate with the field conditions. SPECIAL EQUIPMENT The ROMS will ensure that each regional, province and district office has adequate access to the following equipment as and when required. GPS tools, Digital Camera, Scanner, Printer, Faximale Mechine
48
TECHNICAL, ADMINISTRATIVE AND LOGISTICAL SUPPORT No Change
49
No Change
X 50
SPECIAL EQUIPMENT No Change
43
No.
51
Amendment No. 7 LCD Projector, Personal Desktop Computer (PC), Laptop/Notebook Computer. Handy Talky/HT Radio Rig Generator Set
No.
In addition the ROMS will provide a package of water test kits and/or specific instruments for every 3 districts or a minimum of one (1) package per province. The water test kit must be able to measure the following minimum parameters and be maintained complete with consumables readily available for their required use. Parameter
Unit
Allowable level
1.
Iron
mg/l
< 0.3
2.
Hardness
mg/l
< 500
3.
Chloride
mg/l
< 250
4.
pH
mg/l
6.5 – 8.5
5.
Turbidity
NTU
[1]
[1]
51
Amendment No. 8
Remarks
No Change
Dependent on proposed use and treatment method. Instrument should be capable of measuring turbidity in the range 0 – 500 NTU.
44
Table 3: Terms of Reference for Key ROMS Team Positions Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
Position: Project Manager (PM) Location: Regional Centre The PM has direct responsibility for management of the ROMS Reports to: CPMU/PPMUs & Project team in the respective region, provinces and districts, and the Director quality and timely performance of its contract obligations.
He/she should have Bachelor Degree (S1) but timely delivery of all ROMS outputs under the contract including those for which he/she is directly preferable have Advance Degree (S2) in a discipline relevant to this assignment (such as responsible as follows.
and coordinate closely with the Heads of the Regional
environmental engineering, civil engineering,
The Inception Report.
PPMUs as well as the Coordination teams and Technical
environmental health, project management,
Progress reports namely: Monthly Reports,
Teams at the provincial level. He/she will also liaise and
community/social development).
He/she should have 17 years experience in
required.
relevant technical and/or management roles.
He/she will be responsibility for the optimal achievement of
This experience should include at least 7
the project goals, objectives and outputs particularly through
years experience in team leadership/ project
the performance of the project activities at the village and
management roles for projects of similar
district levels in their respective region. The ROMS
scope and complexity.
responsibilities will be closely related to the KPI for
and/or implementing of CDD based water
adjusted appropriately for their respective region. The ROMS
supply and sanitation, environmental health
will coordinate with, receive technical support from, and be
and/or small scale infrastructure projects,
monitored by the CMAC in respect of the achievements of
preferably in rural areas.
He/she will be responsible for developing a coordinated
Quarterly Reports and Annual Reports.
The Draft Final and Final Reports.
Field visit reports, technical notes and working papers as required.
Special Reports as requested.
Implementation Support Mission inputs as requested/required.
At least 10 years experience in planning
PAMSIMAS II at the national level as set out in Annex B
KPIs for its respective region.
He/she will report to the Head of the CPMU and will liaise
coordinate closely with the CMAC Team Leader and staff as
The PM should meet the following minimum criteria: The PM will be responsible for ensuring quality and
Validated provincial and Center Regional level MIS reports.
Other relevant documents/reports as requested by the Head of the CPMU.
PAMSIMAS Training certification Level A or B+.
approach to delivery of the ROMS services by the ROMS team at the various project levels from village through district to province and region. This will include the core responsibilities of the ROMS including technical assistant for implementation, capacity building, supervision, monitoring and evaluation, and reporting.
45
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
He/she will lead the ROMS teams capacity building and training activities including planning and implementation with support from the central level TDS using ROMS team members as trainers and resource persons for the delivery of specific training and capacity building programs and events.
He/she will participate in project meetings, workshops and other events as required either the region, and/or the participating provinces/districts, and in Jakarta as appropriate.
He/she will lead the ROMS team’s participation in the Expert Group Meetings at both central and regional level in respect of the relevant region.
He/she shall also participate in other CPMU management meetings when requested by the CPMU.
He/she shall also participate in field supervision and monitoring visits within the region as required. These will include bit not be limited to Spot Checking in accordance with the specific requirements of the TOR as outlined in Section XIII.
In particular he/she will lead the ROMS efforts in support of periodic World Bank Implementation Support Missions and participate in the Mission activities as required.
He/She will supervise and provide support to Provincial Coordinator to ensure that complaint handling mechanisme be followed up with appropriate, effective and accurate.
He/she will undertake other relevant activities as requested from time to time by the Head of the CPMU and/or the PPMUs from the respective provinces.
46
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
He/she will be responsible on data validation of the provincial and regional level MIS reports.
Position: Data Management Specialist (DMS) Location: Regional Centre Reports to: Project Manager
The DMS key responsibility is ensure that: (a) the PAMSIMAS MIS The DMS shall meet the following minimum criteria: The DMS will be responsible for the following key program is well understood, particularly at the district and village
Bachelor degree (S1) in computer science, deliverables.
levels; (b) all relevant guidelines, SOPs, log books and forms for
information technology and/or statistics and/
Effective operation of the MIS systems and
data input etc., are promptly distributed to all relevant ROMS team
or other disciplines but having the relevant
reporting within the respective region.
members particularly at the district level and to the facilitators
certificate
(community, sustainability and STBM); and (c) to ensure complete, accurate and timely completion and submission of the district MIS data entry. Specific tasks of the DMS include the following:
At least eight (8) years relevant experience.
Broad capability in: (a) Implement
Provide technical support, mentoring, training and capacity building to strengthening the capacity of key MIS
Operator particularly to ensure he/she has the capacity to provide local level technical support, on the job training and
at village and district levels.
MS Office suite of programs particularly Excel
required to support the PAMSIMAS MIS application.
and MS Access.
Operating procedures and training materials related to the MIS operations particularly those
dream weaver and SQL; and (d) the use of
with the data entry, data management, analysis and reporting Provide in-depth support for the district Level Database
application with C language, Java Script, PHP
software and other related applications such
areas to ensure they are able to carry out their tasks related
databases.
Access; (c). operation of website design
district level team and the facilitators, in their respective work
Regularly maintained and accurate MIS
MIS/database applications; (b) Implement of web server, My SQL, Visual Basic and MS
stakeholders at the district level, particularly the ROMS
Some experience in training and capacity
Routine periodic and specially requested MIS reports.
Verified provincial and Center Regional level MIS reports.
Other deliverables as requested by the PM and/or PPMUs.
building for similar application.
mentoring for the facilitators in relation to their MIS data collection and data management tasks.
Ensure that a coordinated approach is used by the key MIS stakeholders so that MIS data entry, verification, uploading, analysis and reporting is undertaken correctly and in
47
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
accordance with agreed reporting schedules.
Contribute to training/capacity improvement for key MIS stakeholders directly and/or through the regional/provincial and district training programs. Provide relevant input to the planning, development and implementation of training/capacity building programs related to the MIS.
Prepare a strategy and work plan and provide implementation support for institutionalization of the MIS within relevant local government agencies in their specific areas of responsibility.
Coordinate the routine periodic MIS data entry, data management, analysis and reporting so that reporting can be done accurately and in accordance with agreed schedules at the various levels of the project.
Will be responsible on data verification of provincial and district levels MIS reports prior to data validation by the PM.
Position: Local Government Specialist (LGS) Location: Regional Centre Reports to: Project Manager
The LGS will provide facilitation, advocacy and assistance to
The LGS shall meet the following minimum criteria:
The LGS will be responsible for ensuring quality and
provincial and district governments and local stakeholders (Pokja
He/she should hold a Bachelors Degree (S1)
timely delivery of a range of programs and activities
AMPL) in promoting community-based rural water supply and
in an appropriate discipline (Finance, Public
related to the capacity building for local government
sanitation planning and budgeting at district level, including
Administration, Economics, Accounting).
planning and budgeting for community based WSS.
encouranging distsrict governments to establish institutional framework for managing rural water supply and sanitation program. The LGS will be based at the regional level and will work closely with provincial and district coordinators in the implementation, supervision and monitoring the LG component at district level.
At least 10 years working experience.
At least five years experience in providing technical assistance and/or capacity building
Specific deliverables for which the LGS will be responsible include the following.
technical assistance and advocacy at provincial
for local government (district and/or province)
and district/municipality levels.
particularly in the area of local development planning and budgeting, including significant
Program and schedule for implementation of LG
Work Plan (including indicative budget) for
48
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
Capacity building will be undertaken directly by the LGS and
experience with participatory planning and
raising awareness and commitment of local
through specific capacity building events using dedicated training
budget processes.
decision‐makers (Kepala Daerah, Sekda,
Some experience in community‐based water
Kepala Bappeda and related Kepala Dinas),
and sanitation or other social infrastructure
legislative branch and related key stakeholders.
specialists and/or teams as appropriate.
Specific activities for the LGS include the following.
support of community based WSS in each
monitoring mechanism for the implementation of RAD AMPL,
funded by the World Bank and/or other
participating district.
and establishing institution for managing district rural water
multilateral development banks would be an
supply and sanitation program.
advantage.
Provide guidance to provincial and district coordinators in
Team (Task Force) of Rencana Aksi‐AMPL is established and functioning
Work‐Plan and budget arrangement issued by
facilitationg, supervising and monitoring the provincial and
TKK for preparing the Rencana Aksi‐AMPL and
district governments in the implementation of LG component
replication.
Develop and refine a program and schedule for technical
WSS, especially community‐based WSS,
assistance and advocacy for districts (including both local
included as priority in RKPD or in other local
government and legislative branches) to support: (a)
planning/budget documents.
preparing water and sanitation Action Plan (Rencana Aksi‐
AMPL) and budget which focused on community‐based WSS; (b) addressing the specific planning and budgeting requirements for replication villages; and (c) capacity development for the TKK and Pokja AMPL focused on strengthening awareness and commitment of decision
and Pokja AMPL to develop and/or strengthen awareness and commitment of decision‐makers (Kepala Daerah, Sekda, Kepala Bappeda and related Kepala Dinas) and legislative branch for prioritizing the WSS achievement of MDGs,
Implementation of replication villages in accordance with the PAMSIMAS approach.
MIS Logbook Module 6 from all districts/municipalities recorded in website PAMSIMAS
prioritization of the MDGs in particular. Provide capacity development and technical support to TKK
Increased annual expenditure of LG on community based WSS.
makers to community based WSS in general and
POKJA AMPL is established and functioning in
Experience in the implementation of projects
including Pokja AMPL in preparing RAD AMPL, developing
programs would be an advantage.
Provide guidance to Provincial and Districts Governments,
Inputs for National Consultant (specialist who is assigned to manage Component 1 for LG) in developing advocacy tools and/or instruments for raising awareness and triggering action of local governments and legislatures to politically
49
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
including promotion of community‐based WSS in districts/municipalities and provinces.
support the community based WSS efforts.
Provide capacity development and technical support to TKK and Pokja AMPL in preparation of improved WSS‐based
planning process.
participatory planning and budgeting process, starting from identification key stakeholders, mapping of WSS programs and related local development programs in districts/ municipalities, institutional set up (including budget), developing program/ activities, targets and indicators, documentation (plans, budget documents), legalization, and
Field visit reports, technical notes and working papers as required.
Special Reports as requested.
Implementation Support Mission inputs as requested/required.
Other relevant documents/reports as requested by the PM and/or the PPMUs.
Provide technical support to TKP and Provincial Pokja AMPL in coordination, monitoring, and evaluation of TKK and
Inputs to the Draft Final and Final Reports in relation to the LGS activities.
synchronization with the local development plans (RPJMD or Renstra).
Records and documentation of participatory
Verified MIS reports related to Local
District Pokja AMPL program and activities.
Government Achievements on both provincial
Assist and facilitate the TKK, Pokja AMPL, and Team (Task
and district levels.
Force) of Rencana Aksi‐AMPL in coordinating workshops, focused group discussion, group‐meetings, and similar activities to support the implementation of Rencana Aksi‐ AMPL preparation and institutionalization.
In coordination with the Regional Data Management Assistant and the ROMS district level team (particularly the District Coordinator and Data Entry Operator / Administration Officer (DEAO)), ensure the establishment and implementation of a regular recording system on local government’s performance in PAMSIMAS scaling up, mainstreaming, and sustainability on the PAMSIMAS M&E/MIS system (Module 6: Local Government).
50
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
Provide capacity development and technical support to Team (Pokja AMPL) in the implementation of district RAD AMPL, including provision of local budget, and necessary resources.
Provide input to National Consultant (specialist who is assigned to manage Component 1 for LG) for improving the content or materials of the technical guidelines concerning the WSS‐based RKPD preparation and replication for local government.
Provide input to National Consultant (specialist who is assigned to manage Component 1 for LG) in improving the concept or strategy of programmatic technical assistance for supporting local government to accommodate WSS priority at district/municipality and provincial levels through local participatory planning and budgeting (WSS‐based RKPD).
In coordination with RDMA and the Database Operator, maintain regular recording system on the Achievement of Component 1 (LG) on the PAMSIMAS web based M&E/MIS system.
Other tasks related to the Component 1 of PAMSIMAS as requested by the CPMU, PPMU and DPMU and TKK.
Will be responsible on data verification of the MIS reports related to Local Government Achievements on both provincial and district levels prior to data validation by the PM.
Position: Training Coordinator (TC) Location:Regional Centre Reports to:Project Manager
The TC is responsible for coordination of the training development The TC should meet the following minimum criteria. The TC shall be responsible for the following team to ensure quality and timely delivery of all Pamsimas training
Bachelor/S1 degree in education/social
deliverables.
51
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
program in the Province. The TC will operate at the provincial level
science with 12 years’ experience with 8
Pamsimas training curriculums and schedules.
and report directly to the PM and to the PPMU.
years’ experience. He or she must have
Training Needs Aassessment tool.
The PTC will coordinate with their counterparts in the DPMUs as
experience in developing and implementing training preferably for CDD platform such as
Indicators for measuring results and outputs of
well as with the ROMS teams at the district level, through the District Coordinator in their respective districts. Specifically, he or
PNPM, P2DTK, WSLIC and/or Pamsimas with
she will be responsible for the following tasks:
a good understanding of awareness and
Review curriculum and schedule for all Pamsimas training;
Provide guidance for developing training curriculum and schedule;
training.
training monitoring and evaluation.
Monitoring and evaluation mechanism for Pamsimas training implementation.
motivation training and good knowledge in
Recommendations for CF training and capacity building.
PAMSIMAS Training certification Level A.
In conjunction with the CMAC and CPMU Advisory team,
Other deliverables as requested by the PM and/or the PPMU.
develop a gap analysis and training need assessment tool;
Reporting & deliverables
Maintain quality control of the team’s training deliverables and training implementation;
Special Reports as requested.
Implementation Support Mission inputs as requested/required.
Develop indicators for measuring training results and outputs;
Develop monitoring and evaluation mechanism of the implementation of all Pamsimas training.
Liaise with ROMS district level team and facilitators to develop and advise on CF training and capacity building requirements, in consultation with the DPMUs.
Share lessons learned with PMCs in other districts through routine reporting.
Undertake other relevant activities at the request of the PM or PPMU.
Position: Regional Office Manager (OM) Location: Regional Centre Reports to: Project Manager
The OM will provide administrative, bookkeeping and logistical
The OM shall meet the following minimum criteria:
support for the Regional team and particularly for the personnel
Bachelor degree (S1) in an appropriate
The OM will be responsible for the following key deliverables in accordance with specific requirements
52
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
based at the Regional level. The OM will also support the
field/discipline.
to be established by the PM.
Provincial and district level offices in establishing compatible office administration systems.
At least 5 years relevant experience.
An efficiently run Regional office.
Experience in providing similar services for
Office bookkeeping system.
major multi level and geographically diverse
Office filing system.
Travel bookings and ticketing.
Routine reports.
Support to provincial and district offices.
projects is highly desirable.
The ability to work independently during the absence of the PM in the field is essential.
Position: Regional Supporting Staff / Operator Computer (OC) Location: Regional Centre. Reports to: Project Manager
The OC will provide support for the Regional team and particularly
Diploma III (D III), at least one (1) years
The ROC will be responsible for the following key
for the personnel based at the Regional level, including:
relevant experience, or
deliverables in accordance with specific requirements
Relevan Vocation High Scool at least three
to be established by the regional team - OM.
(3) years relevant experience
Administration filling system
Broad capability in the use of MS Office suite
Office filing system.
In the administrative support function, The ROC should coordinate
of programs particularly Excel and MS
Accurate typing, consistent and reliable data
with the regional-level OM in relation to the establishment of
Access.
Training Administration
Document typing, formatting and designing
Scanning and digitization of documents
consistent systems and procedures for all aspect of the regional
Support to regional offices.
The ability to work independently during the absence of the PM in the field is essential.
office administration.
He/she shall have good attention to detail, and fast and accurate typing speeds.
The ability to work independently during the absence of the PM in the field is essential.
Position: Provincial Coordinator (PC) Location: Province Reports to: PPMUs & Project Manager
The PC will be responsible for the overall management of the
The PC should meet the following minimum criteria: The PC will be responsible for ensuring quality and
ROMS provincial based team and the provincial level support and
coordination for district level ROMS teams. The PC will directly
He/she should have a Bachelors degree (S1)
timely delivery of ROMS outputs from the respective
in a discipline relevant to this assignment
provincial level.
53
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
support the PPMU and the TKP/Pokja AMPL and Provincial
(such as environmental engineering, civil
Inputs to the Inception Report.
Technical Team building their capacity for provincial planning and
engineering, environmental health, or
Provincial level progress reports namely:
coordination for project implementation. He also will provide
community/social development).
Monthly Reports, Quarterly Reports and Annual
PAMSIMAS Training certification Level A or B+
Reports.
facilitation, advocacy and assistance to local stakeholders at the district level in relation to local participatory planning and budgeting for community based WSS. He/she will provide
direction, guidance and support to the district based ROMS teams.
outputs particularly through the performance of the
be closely related to the KPI for PAMSIMAS II at the
Significant experience in contributing to and and capacity building activities is essential.
Experience in managing small teams and coordinating activities at different levels of
capacity building programs and activities.
CAP Reviews.
Establishment of provincial and district level MIS systems.
Significant experience in project monitoring
Establishment of provincial and district level complaints systems.
Field visit reports, technical notes and working papers as required.
government is highly desirable.
appropriately for their respective region. The ROMS
Inputs to the development to training and
coordinating the implementation of training
national level as set out in Annex B adjusted will coordinate with, receive technical support from,
preferably in rural areas.
project activities at the village and district levels in their respective region. The ROMS responsibilities will
Inputs to the Draft Final and Final Reports.
and/or small scale infrastructure projects,
He/she will be responsibility for the optimal achievement of the project goals, objectives and
supply and sanitation, environmental health
Specific tasks will include the following.
At least 12 years experience in planning and/or implementing of CDD based water
Special Reports as requested.
and be monitored by the CMAC in respect of the
and evaluation including project management,
Implementation Support Mission inputs as
achievements of KPIs for its respective province.
finance, procurement and community
requested/required.
development aspects is essential.
He/she responsibility for the facilitators and particularly the senior facilitator with the
reports.
Significant experience in the implementation
implementation of the sustainability phase of
of projects funded by the World Bank and/or
PAMSIMAS including the establishment of the
other multilateral development banks.
Validatied provincial and district levels MIS
Other relevant documents/reports as requested by the PM and/or the PPMUs.
Association of Village Management Organizations (SPAMS Perdesaan) at district level including participation in related workshops and training at district and provincial levels.
Support PPMUs and DPMUs in the dissemination of Project
54
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
Management Manual (PMM) and Village Implementation Manual (VIM) to each district and relevant agency, and work in collaboration with Training Team in socialization of these documents.
Support PPMUs and DPMUs in project administration, management, planning and scheduling the project; providing in technical assistance and support and monitoring implementation progress and quality.
Support the PPMUs with the provincial consolidation of routine progress reporting to the regional level.
Manage, supervise, monitor and provide feedback to the district level implementation teams (DPMUs, ROMS district teams and facilitators) based on the village implementation progress, the district level reports and periodic field visits.
Coordinate with other related institutions in improving community empowerment in the community based WSS planning and implementation.
Support the enhancement of project implementation and monitoring and evaluation based on the CMAC feedback.
Support the related parties to conduct post review of VIT documentation for: (a) disbursement of block grant funds; (b) expenses for procurement, materials and equipment; (c) valuation of community labor and local materials contributions; and (d) financial and procurement processes and procedures.
Facilitate provincial government (PPMU/Pokja AMPL) to establish regular supervision and monitoring to districts in preparing and implementing RAD AMPL, among other
55
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
ensure increased budget at district level will be monitored regularly by provincial government.
Facilitate provincial government (Pokja AMPL) to provide support for district government in establishing institutional framework for managing rural water supply and sanitation program.
Facilitate provincial government (PPMU) for ensuring district governments will carry out transparent and accountable village selection process. Encourange Provincial Pokja AMPL to regularly monitor the quality of village selection process.
Communicate and facilitate the related parties in order to handling of complaints at the provincial level, and responsible to input data related to complaints handling at provincial level into application.
Communicate the results of the handling complaints and provide feedback to the Project Manager ROMS, CMAC Complaint Handling Specialist and District Coordinator
Ensure the updated data and information related to LG component available in Pamsimas MIS and website in timely manner
For Institutional Capacity Building tasks, the PC with support from the other provincial ROMS team members, will be responsible for coordinating the planning and delivery of capacity building activities at the provincial and district levels to enhance quality of program implementation. Specific capacity building and training activities will include the following.
Coordinate capacity building activities for the start up phase of PAMSIMAS II, including establishing systems for program
56
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
administration and financial management, safeguards strategies, community driven approaches and other priority implementation activities.
Coordinate implementation of an annual training needs assessment for provincial and district capacity building using PAMSIMAS guidelines for capacity building, and provide recommendations for provincial training plans and budget proposals and provide feedback on annual PPMU and DPMU budget proposals related to training.
For Project Implementation Support, the PC will work closely with provincial and district agencies to build institutional and facilitator capacity for effective implementation of village level activities in accordance with the PMM and the VIM. The PC will undertake the following specific tasks.
Provide support as required to the district level ROMS teams and facilitators for the planning and design of appropriate technology village water supply and institutional sanitation systems in accordance in accordance with the CAPs.
Provide support as required to the district level ROMS teams and facilitators in coordinating and facilitating PAMSIMAS inputs for schools and communities for implementation of CAPs related to hygiene and sanitation as well as for district wide STBM implementation.
Transfer knowledge to district level ROMS teams and facilitators for conducting participatory processes and improving participation of women and poor and other marginalized groups in community based decision making and management.
57
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
Work with DPMU and district ROMS teams to address and resolve any technical issues arising from the field visits.
Assess quality of work performed by the district level ROMS teams and facilitators; recommend specific technical training to improve their service delivery.
Ensure the district level ROMS teams and facilitators understand and comply with standards and evaluation criteria for environmental assessment and conduct spot checks of environmental impact assessments.
Monitoring and evaluation of the quality of CAPS (by sample) to identify areas for improvement and make recommendations to CPMU, PPMU and DPMU accordingly.
For project monitoring and evaluation the PC will conduct regular monitoring and evaluation activities of all project components at the provincial, district, and community levels by working together with other members of the ROMS provincial team. The Provider will use as a reference the approved PMM and VIM as the basis for activities to be implemented under the project as well as indicators for evaluation of implementation performance. The PC will undertake the following specific activities.
Develop detailed program monitoring and evaluation procedures at provincial and district levels, including all indicators to be monitored, and disseminate this procedure effectively to the PPMU and DPMUs, based on guidance from the CMAC.
Implement and operate the computer based MIS system (developed and enhanced by the CMAC) at the provincial and district levels (together with the district level ROMS
58
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
teams, particularly the DC.
Ensure that all data collection, processing and report production at provincial district and village levels meets procedural and quality requirements and reporting schedules, including collection and analysis of gender and socioeconomic data.
Make periodic visits to districts and communities to monitor the quality control implementation processes and outcomes.
Assess the community’s perception of the quality of services provided by the project, including assessment of training and project staff for community mobilization, preparation and training for CAP development, facilitation by the CFs for CAP planning, implementation, operations and maintenance of village level WSS facilities and services.
Coordinate six monthly quality review of sample CAPS and make recommendations for improvement to CPMU and PPMUs.
Support the PPMUs and the DPMUs with the establishment of the projects complaints systems based on guidance from the CMAC.
Monitor and report on the complaints received and resolved and action taken on un-resolved complaints.
Other tasks as requested by the PM and/or the PPMUs.
Will be responsible on data validation of the provincial and district levels MIS reports prior to data validation by the PM.
Position: Quality Assurance Specialist (QAS) Location: Province
The QAS is responsible for providing independent and objective
The QAS should meet the following minimum
The QAS shall be responsible for the following
59
Assignment location/ Direct Scope of services reporting Reports to: Propincial Coordinator monitoring of project progress at village and district levels and to and PPMU help ensure transparency and compliance with key process
Qualifications and experience criteria.
Bachelor degree (S1) in a discipline relevant
Reporting & deliverables deliverables.
Regular reports on routine monitoring and
requirements in all aspects of project implementation. The QAS
to this assignment (such as civil,
quality assurance reviews including community
will operate at the provincial level and report directly to the PM and
environmental engineering, environmental
level process assessments.
to the PPMU.
health, or community/social development).
Sustainability Monitoring data
Advance degree(S2) in social sciences,
Recommendations for CF training and capacity
The QAS will coordinate with their counterparts in the DPMUs as
well as with the ROMS teams at the district level, through the
health, education, or related field would be
District Coordinator in their respective districts. He/she will
highly regarded.
undertake the following tasks.
Through regular reviews of project documentation and regular visits to project-assisted communities, carry out quality assurance of project activities from initial road show
community based water supply and sanitation
implementation of CAPs. In particular the reviews will include
and/or rural infrastructure development and
quality assurance of project processes. Through this process implementation problems as early as possible.
Collect and analyze sustainability indicators for draft CAPs
following criteria:
Review and certify district level progress reporting prepared by the DPMU with support from the District Coordinator and the facilitators and facilitators.
papers as required.
Special Reports as requested.
Implementation Support Mission inputs as requested/required.
Verified and assured provincial and district levels MIS reports.
(RAB) for WSS and/or other rural
CAP review process prior to final acceptance by the
Experience in developing Detailed
Field visit reports, technical notes and working
Engineering Design (DED) and cost estimate
(Step 2 of Sustainability Monitoring System) as part of the community.
financing. The consultant should fulfill the
the QA will identify and seek solutions to identified
Other deliverables as requested by the PC and/or the PPMU.
10 years relevant experience including at least 6 years experience in implementation of
and village selection through to preparation and
PAMSIMAS Training certification Level A or B+.
building.
infrastructure facilities.
Some experience with direct community financing for development projects would be highly regarded.
Provide guidance and technical support to CFs through the DPMU, to improve compliance with implementation process requirements, particularly in relation to procurement and financial aspects (including village level financial
60
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
management).
Liaise with ROMS district level team and facilitators to develop and advise on CF training and capacity building requirements, in consultation with the DPMUs.
Meet with community members (from the VIT and others) to assess the communities’ satisfaction with the quality of services provided to them by the project, including their assessment of training and support provided by project staff for community mobilization, preparation and training for CAP development, WSS facility planning, operation & maintenance, management of WSS and health and sanitation services, and financial management by the VIT.
Conduct process monitoring of key community level activities and decision making processes to ensure active, gender and poverty inclusive, community participation throughout the village implementation process from initial assessment and planning through to implementation and subsequent operation and management of water and institutional environmental sanitation facilities and services.
Work closely with the ROMS district level teams and CFs to review project cost estimates and procurement processes, including review of VIT documentation of disbursement of block grant funds, expenses for procurement of materials and equipment (and civil works if required), and valuation of community labor and local material contributions.
Work with DPMUs and communities (as required) to ensure financial management is being undertaken in accordance with project requirements.
61
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
Conducting post reviews of the VITs; and review the financial and procurement processes and procedures for all project activities undertaken at DPMUs.
Share lessons learned with PMCs in other districts through routine reporting.
Undertake other relevant activities at the request of the PM or PPMU.
Will be responsible on data verification and assurance of the provincial and district levels MIS reports prior to data validation by the PC.
Position: Provincial Financial Management Specialist (PFMAS) Location: Province Reports to: Provincial Coordinator
The PFMS will be responsible for carrying out all PAMSIMAS
The PFMS should meet the following minimum
The PFMS shall be responsible for the following
provincial level program financial management tasks,
criteria.
deliverables.
strengthening of the capacity of the facilitators related to financial
management at community KKM level and carrying out the M&E of the quality of the KKM Community level book keeping through field visits and field spot checking. The PFMS shall ensure the
stakeholders. In carrying his/her tasks, the PFM will be assisted by
tasks will include the following. Ensure the proper distribution technical guidelines of activity and technical guidelines of financial management on the community level for standard bookkeeping for KKM or PAMSIMAS unit under KKM.
Provide support and technical assistance to the district‐
quality assurance reviews of village financial
Eight 8 years relevant experience including
management.
budgeting and accounting.
district‐based Financial Management Assistant (DFMA). Specific
Regular reports on routine monitoring and
accounting, or economics. substantial experience in project financial
proper and timely distribution of technical manuals, implementation guidelines and SOPs for financial management to all staff and
Bachelor degree (S1) in finance, management
Five years accounting/financial management
Inputs to ROMS progress and other reports in relation to financial management aspects.
Reports on follow up in relation to misuse of
experience related to community based
village funds.
development activities particularly those which included financial management responsibility
Recommendations for CF and village level
at the community level.
financial management aspects.
General knowledge of government structure
and budgetary procedures particularly those related to PAMSIMAS or other comparable CDD projects.
training and capacity building in relation to Other deliverables as requested by the PC and/or the PPMU.
Field visit reports, technical notes and working
62
Assignment location/ Direct reporting
Scope of services based DFMA particularly on the community book keeping
feasibility studies for rural infrastructure
Oversee the implementation of PAMSIMAS provincial and
investment would be an advantage.
papers as required.
Special Reports as requested.
Implementation Support Mission inputs as
Project financial management related to
are providing optimal support to the LKM Community level
planning, design, execution, and operation
book keeping and water tariff (BPS revenue) aspects as
and maintenance would be an advantage.
required.
Reporting & deliverables
Some experience in financial aspects for
management. district level financial management and ensure that the CFs
Qualifications and experience
requested/required.
Verified provincial and district levels MIS reports related to Financial Progress.
Take measures, give warning, sanctions and/or others necessary steps to ensure transparency and accountability in the use of the village grant funds, especially in the area of book keeping administration.
Assume full responsibility for meeting the book keeping performance indicators for KKM financial management as stipulated in the PMM and/or VIM.
Take full responsibility for errors, deviations and financial mismanagement.
To test the performance indicator measurement picking KKM financial management every month against 10% of 50% rural villages conducted by the learned trial DFMA and to input data into MIS Pamsimas financial management applications
Proactively assist the local Stakeholders in providing the required data and information for the annual project budgeting – the DIPA and DIPA Revision as required.
Provide financial input to the ROMS progress and other reports as requested.
Undertake other relevant activities at the request of the PC or PPMU.
63
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
Will be responsible on data verification of the provincial and district levels MIS reports related to Financial Progress prior to data validation by the PC.
Position: Assistance Provincial Coordinator (APC) Location: Province Reports to: Provincial Coordinator
The APC will be responsible for the overall management of the
The APC shall comply with the following minimum
The APC will be responsible for ensuring quality and
ROMS provincial based team and the provincial level support and
criteria.
timely delivery of ROMS outputs from the respective
coordination for district level ROMS teams. The APC will directly
Bachelor (S1) in Sanitary Engineering, Civil
provincial level.
support the PC, PPMU and the TKP/Pokja AMPL and Provincial
Engineering, Environmental Engineering or
Inputs to the Inception Report.
Technical Team building their capacity for provincial planning and
closely related field/discipline.
Provincial level progress reports namely:
coordination for project implementation. He also will provide facilitation, advocacy and assistance to local stakeholders at the district level in relation to local participatory planning and budgeting for community based WSS. He/she will provide
direction, guidance and support to the district based ROMS teams. Specific tasks will include the following.
He/she will be responsibility for the optimal achievement of the project goals, objectives and
or
Reports.
7 years cumulative experience in the planning,
Inputs to the Draft Final and Final Reports.
design and implementation of small scale rural WSS facilities implemented using community
Inputs to the development to training and
Complementary experience in environmental health and hygiene promotion would be highly regarded.
project activities at the village and district levels in their respective region. The ROMS responsibilities will
Solid knowledge of basic WSS engineering is
be closely related to the KPI for PAMSIMAS II at the
essential particular as relates to small scale
national level as set out in Annex B adjusted
rural systems.
appropriately for their respective region. The ROMS
Experience in mentoring, training and capacity
will coordinate with, receive technical support from,
building for project staff, district level
and be monitored by the CMAC in respect of the
institutions and communities.
achievements of KPIs for its respective province.
particularly the senior facilitator with the
Demonstrated ability and willingness to spend
capacity building programs and activities.
CAP Reviews.
Establishment of provincial and district level MIS systems.
Establishment of provincial and district level complaints systems.
Field visit reports, technical notes and working papers as required.
Special Reports as requested.
Implementation Support Mission inputs as requested/required.
Understanding of local (district) culture and language is highly desirable.
He/she responsibility for the facilitators and
Monthly Reports, Quarterly Reports and Annual
C
based approaches.
outputs particularly through the performance of the
PAMSIMAS Training certification Level
B-
Validatied provincial and district levels MIS reports.
64
Assignment location/ Direct reporting
Scope of services implementation of the sustainability phase of PAMSIMAS including the establishment of the
Qualifications and experience significant time in the field at village level.
Reporting & deliverables Other relevant documents/reports as requested by the PM and/or the PPMUs.
Association of Village Management Organizations (SPAMS Perdesaan) at district level including participation in related workshops and training at district and provincial levels.
Support PPMUs and DPMUs in the dissemination of Project Management Manual (PMM) and Village Implementation Manual (VIM) to each district and relevant agency, and work in collaboration with Training Team in socialization of these documents.
Support PPMUs and DPMUs in project administration, management, planning and scheduling the project; providing in technical assistance and support and monitoring implementation progress and quality.
Support the PPMUs with the provincial consolidation of routine progress reporting to the regional level.
Manage, supervise, monitor and provide feedback to the district level implementation teams (DPMUs, ROMS district teams and facilitators) based on the village implementation progress, the district level reports and periodic field visits.
Coordinate with other related institutions in improving community empowerment in the community based WSS planning and implementation.
Support the enhancement of project implementation and monitoring and evaluation based on the CMAC feedback.
Support the related parties to conduct post review of VIT documentation for: (a) disbursement of block grant funds; (b)
65
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
expenses for procurement, materials and equipment; (c) valuation of community labor and local materials contributions; and (d) financial and procurement processes and procedures.
Facilitate provincial government (PPMU/Pokja AMPL) to establish regular supervision and monitoring to districts in preparing and implementing RAD AMPL, among other ensure increased budget at district level will be monitored regularly by provincial government.
Facilitate provincial government (Pokja AMPL) to provide support for district government in establishing institutional framework for managing rural water supply and sanitation program.
Facilitate provincial government (PPMU) for ensuring district governments will carry out transparent and accountable village selection process. Encourange Provincial Pokja AMPL to regularly monitor the quality of village selection process.
Communicate and facilitate the related parties in order to handling of complaints at the provincial level, and responsible to input data related to complaints handling at provincial level into application.
Communicate the results of the handling complaints and provide feedback to the Project Manager ROMS, PC, CMAC Complaint Handling Specialist and District Coordinator
Ensure the updated data and information related to LG component available in Pamsimas MIS and website in timely manner
For Institutional Capacity Building tasks, the APC with support
66
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
from the other provincial ROMS team members, will be responsible for coordinating the planning and delivery of capacity building activities at the provincial and district levels to enhance quality of program implementation. Specific capacity building and training activities will include the following.
Coordinate capacity building activities for the start up phase of PAMSIMAS II, including establishing systems for program administration and financial management, safeguards strategies, community driven approaches and other priority implementation activities.
Coordinate implementation of an annual training needs assessment for provincial and district capacity building using PAMSIMAS guidelines for capacity building, and provide recommendations for provincial training plans and budget proposals and provide feedback on annual PPMU and DPMU budget proposals related to training.
For Project Implementation Support, the APC will work closely with provincial and district agencies to build institutional and facilitator capacity for effective implementation of village level activities in accordance with the PMM and the VIM. The APC will undertake the following specific tasks.
Provide support as required to the district level ROMS teams and facilitators for the planning and design of appropriate technology village water supply and institutional sanitation systems in accordance in accordance with the CAPs.
Provide support as required to the district level ROMS teams and facilitators in coordinating and facilitating PAMSIMAS inputs for schools and communities for implementation of
67
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
CAPs related to hygiene and sanitation as well as for district wide STBM implementation.
Transfer knowledge to district level ROMS teams and facilitators for conducting participatory processes and improving participation of women and poor and other marginalized groups in community based decision making and management.
Work with DPMU and district ROMS teams to address and resolve any technical issues arising from the field visits.
Assess quality of work performed by the district level ROMS teams and facilitators; recommend specific technical training to improve their service delivery.
Ensure the district level ROMS teams and facilitators understand and comply with standards and evaluation criteria for environmental assessment and conduct spot checks of environmental impact assessments.
Monitoring and evaluation of the quality of CAPS (by sample) to identify areas for improvement and make recommendations to CPMU, PPMU and DPMU accordingly.
For project monitoring and evaluation the APC will conduct regular monitoring and evaluation activities of all project components at the provincial, district, and community levels by working together with other members of the ROMS provincial team. The Provider will use as a reference the approved PMM and VIM as the basis for activities to be implemented under the project as well as indicators for evaluation of implementation performance. The APC will undertake the following specific activities.
Develop detailed program monitoring and evaluation
68
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
procedures at provincial and district levels, including all indicators to be monitored, and disseminate this procedure effectively to the PPMU and DPMUs, based on guidance from the CMAC.
Implement and operate the computer based MIS system (developed and enhanced by the CMAC) at the provincial and district levels (together with the district level ROMS teams, particularly the DC.
Ensure that all data collection, processing and report production at provincial district and village levels meets procedural and quality requirements and reporting schedules, including collection and analysis of gender and socioeconomic data.
Make periodic visits to districts and communities to monitor the quality control implementation processes and outcomes.
Assess the community’s perception of the quality of services provided by the project, including assessment of training and project staff for community mobilization, preparation and training for CAP development, facilitation by the CFs for CAP planning, implementation, operations and maintenance of village level WSS facilities and services.
Coordinate six monthly quality review of sample CAPS and make recommendations for improvement to CPMU and PPMUs.
Support the PPMUs and the DPMUs with the establishment of the projects complaints systems based on guidance from the CMAC.
Monitor and report on the complaints received and resolved
69
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
and action taken on un-resolved complaints.
Other tasks as requested by the PM, PC and/or the PPMUs.
Will be responsible on data validation of the provincial and district levels MIS reports prior to data validation by the.
Position: Provincial Assistance Administration / Sekretary (PAA) Location: Province Reports to: Provincial Coordinator
The POMS will provide administrative, bookkeeping and logistical
The POMS shall meet the following minimum
The POMS will be responsible for the following key
support for the Province team and particularly for the personnel
criteria:
deliverables in accordance with specific requirements
based at the Province level. The PAA will also support the
Diploma III (D III) in a discipline relevant to
to be established by the PC.
Province level offices in establishing compatible office
this assignment (such as economics, or
An efficiently run Provincial office.
administration systems and administration support related to
social science).
Office bookkeeping system.
At least 1 years relevant experience.
Office filing system.
Experience in providing similar services for
Travel bookings and ticketing.
Routine reports.
training/workshop event at provincial level.
major multi level and geographically diverse projects is highly desirable. The ability to work independently during the
Support to propincil offices.
absence of the PC in the field is essential.
Position: District Coordinator (DC) Location: District Reports to: DPMU/ Provincial Coordinator
The DC will be responsible for providing project management,
The DC shall comply with the following minimum
The DC will be responsible for ensuring quality and
technical support, coordination and M&E for all PAMSIMAS
criteria.
timely delivery of ROMS outputs from the respective
activities at the district level. The DC will work closely with the
Bachelor (S1) in Sanitary Engineering, Civil
district level.
DPMU and the TKK/Pokja AMPL to ensure the district level
Engineering, Environmental Engineering or
implementation proceeds as planned. He will provide facilitation,
closely related field/discipline.
advocacy and assistance to local stakeholders at the district level in relation to local participatory planning and budgeting for community based WSS. He/she will also be the key resource to backstop and build the capacity of the facilitators including the
PAMSIMAS Training certification Level B- or
District level work plans for district and village level implementation activities (annually).
District level management/progress reports
C
namely: Monthly Reports, Quarterly Reports
7 years cumulative experience in the planning,
and Annual Reports.
70
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
community facilitators, the senior facilitator and the STBM
design and implementation of small scale rural
Inputs to the Draft Final and Final Reports.
facilitator. He/she will be responsible for the ROMS district
WSS facilities implemented using community
Quality assurance reviews.
activities with technical and capacity building support from the
based approaches.
FMA and the Data Entry Operator / Administration Officer (DEAO). The DC will work closely with the facilitators in undertaking this
Inputs to the development to training and
Complementary experience in environmental
role.
regarded.
The main roles will include the following:
essential particular as relates to small scale
level;
rural systems.
Preparation of the overall plan for village level
Experience in mentoring, training and capacity
implementation plan, in consultation with the CFs and the
building for project staff, district level
DPMU and including the work plans for the community
institutions and communities.
Understanding of local (district) culture and
He/she responsibility for the facilitators and particularly the
language is highly desirable.
senior facilitator with the implementation of the sustainability phase of PAMSIMAS including the establishment of the
Demonstrated ability and willingness to spend
capacity building programs and activities.
High level technical inputs and reviews of CAPs and DEDs.
Overall management of the district level MIS (with support from the Data Entry Operator / Administration Officer (DEAO)).
Maintenance of district level complaints system.
Field visit reports, technical notes and working papers as required.
Special Reports as requested.
Implementation Support Mission inputs as requested/required.
significant time in the field at village level.
Association of Village Management Organizations (SPAMS
Verified and validated district level MIS reports.
Perdesaan) at district level including participation in related
Other relevant documents/reports as requested
workshops and training at district levels for sustanibilty
Solid knowledge of basic WSS engineering is
Program management implementation support at district
facilitators at district and village levels;
health and hygiene promotion would be highly
by the PM and/or the PPMUs.
Routine monitoring and management reporting on district level project implementation; and reporting management and monitoring report of project implementation at districts level;
Capacity building for DPMU, Pokja AMPL/TKK, facilitators and communities through on the job training and mentoring as well as through participation in formal training and capacity building programs and events.
The district and village implementation plan for each fiscal year should be approved by the PPMU prior the
71
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
implementation. The annual work plan of provincial / district level will be consolidated at the national level.
Provide capacity development and technical support to DPMU and TKK in implementation of replication program in accordance to the PAMSIMAS approach.
Facilitate local governments in preparing and implementing RAD AMPL, including assist district government in implementing LG workshops and related capacity building activities and provide regular monitoring and consultation for local governments to ensure annual increased budget of AMPL
Facilitate local governments in establishing institution for managing rural water supply and sanitation management, including developing local monitoring mechanism.
Assist district to ensure transparent and accountable village selection process, including ensuring establishment of Pakem and inclusion of civil society in critical stages of village selection process.
Communicate and facilitate the related parties in order to handling of complaints at the district and village level, and responsible to input data related to complaints handling at the district and village level into the CH application
Coordinate with Community Facilitator, monitoring and proactively follow up the handling of complaints, and ensure that complaint handling mechanisme be followed up with appropriate, effective and accurate, and provide feedback to Provincial Coordinator.
Ensure update of data and information concerning the LG
72
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
Component is carried out timely, accurate and in regular manner. More detailed scope of service includes the following.
Carry out strategic planning, coordinating and facilitating of project activities for (a) water supply and sanitation infrastructure and services; and (b) the project health promotion activities for schools and communities; with the Dinas PU (Public Works), Dinkes (District Health Office), Dinas PMD, District Education Office (Dinas Pendidikan), and other relevant local government agencies and NGOs.
Provide high level technical support and work together with CFs to carry out the Rapid Technical Assessment for water supply, develop a set of technology options (where possible), estimate the cost of each option, and assist the VIT to choose the best option of their circumstances (e.g. water demand, level of service, and ability to pay for construction and subsequent O&M).
Undertake quality assurance reviews to ensure compliance with project guidelines for the preliminary design for water supply and sanitation facilities, initial environmental evaluation, cost estimates, economic and financial analysis, the initial tariff estimates, financial management and procurement process.
Provide high level technical inputs and work together with CFs in the presentation of Rapid Technical Assessments (RTA) results and Detailed Engineering Designs (DEDs) to communities.
73
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
Undertake quality assurance review of CAPs, including the DEDs (included cost estimates, environtmental and social safeguard ), before their submission to the DPMU head, and facilitate the community to modify or revise (if needed).
Ensure that activities proposed and implemented as part of the CAP to support health and sanitation meet the project criteria and are aimed at reducing the incidence of water borne disease, through regular review of all CAP activities relating to health promotion, disease prevention and sanitation.
Liaise and work with District Education Office in carry out the school based health promotion to ensure the quality of school health activities.
Liaise and work with District Health Office in carry out community based health promotion activities to ensure the quality of the community health activities
Liaise and work with the District Health Office in the implementation of the district wide STBM program and through the CFs ensure that CAP activities are coordinated with STBM activities which are planned for PAMSIMAS target villages.
Provide technical assistance to CFs in supervising construction, and verify the appropriate quantity and quality of work is performed.
Review and approve any proposed design changes which may have performance implications.
Support the CFs in establishing effective operation and maintenance of water and sanitation systems and undertake
74
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
quality assurance reviews through periodic visits to completed systems.
Review and evaluate the CF reports and consolidated them at the district level.
Monitor implementation of Sustainability Monitoring and ensure accuracy of data in the field book in accordance with the MIS Guideline.
Undertake other relevant activities at the request of the PC or DPMU.
Will be responsible on data verification and validation of the district level MIS reports prior to data verification and assurance by the QAS.
Position: District Financial Management Assistant (DFMA) Location: District. Reports to: District Coordinator
The DFMA will be responsible for carrying out all PAMSIMAS
The DFMA should meet the following minimum
district level program financial management tasks, strengthening of criteria. the capacity of the facilitators related to financial management at
community/ KKM level and carrying out the monitoring of the quality of the LKM Community-level book-keeping through field visits and field spot checking. The DFMA shall ensure the proper
guidelines and SOPs for financial management to all staff and stakeholders. In carrying his/her tasks, the DFMA will be assisted
Specific tasks will include the following. Ensure the proper distribution of technical guidelines for activities and technical guidelines for financial management on the community level for standard bookkeeping for KKM
Regular reports on routine monitoring and
accounting, or economics.
quality assurance reviews of village financial
Five (5) years relevant experience including
management.
budgeting and accounting.
by the provincial‐based Financial Management Specialist (PFMS).
deliverables.
Bachelor degree (S1) in finance, management
substantial experience in project financial
and timely distribution of technical manuals, implementation
The DFMA shall be responsible for the following
Five years accounting/financial management
Inputs to ROMS progress and other reports in relation to financial management aspects.
Reports on follow up in relation to misuse of
experience related to community based
village funds.
development activities particularly those which included financial management responsibility
Recommendations for CF and village level
at the community level.
financial management aspects.
General knowledge of government structure
training and capacity building in relation to Other deliverables as requested by the PM
and budgetary procedures particularly those
75
Assignment location/ Direct reporting
Scope of services
or PAMSIMAS unit under KKM.
related to PAMSIMAS or other comparable
Provide support and technical assistance to the provincial‐
CDD projects.
based PFMS particularly on the community book keeping
feasibility studies for rural infrastructure
Provide guidance and technical assistance to BPSPAM
investment would be an advantage.
Reporting & deliverables and/or the PPMU.
Some experience in financial aspects for
management. particularly on accounting management, sustainability and
Qualifications and experience
papers as required.
Special Reports as requested.
Implementation Support Mission inputs as
Project financial management related to
tariffs.
planning, design, execution, and operation
Provide guidance and technical assistance to KKM primarily
and maintenance would be an advantage.
Field visit reports, technical notes and working
requested/required.
Verified and validated district level MIS reports related to Financial Progress.
on completion of the audit in FY. 2015.
Oversee the implementation of PAMSIMAS district level financial management and ensure that the CFs are providing optimal support to the LKM Community level book keeping and water tariff (BPS revenue) aspects as required.
Take measures, give warning, sanctions and/or others necessary steps to ensure transparency and accountability in the use of the village grant funds, especially in the area of book keeping administration.
Assume full responsibility for meeting the book keeping performance indicators for KKM financial management as stipulated in the PMM and/or VIM.
Take full responsibility for errors, deviations and financial mismanagement.
To test the performance indicator measurement picking KKM financial management every month against 50% of 100% rural villages conducted by the learned trial Facilitator and perform data input into MIS Pamsimas financial management applications.
76
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Reporting & deliverables
Actively monitor and follow up misuse of village grant fund cases in coordination with the CFs and DC. Regularly report on these issues to the DC and Provincial Financial Management Specialist.
Proactively facilitate the efficient management of village/community grant/BLM and expedite the compilation of SPM and SP2D documents for financial reconciliation in coordination with the Provincial Financial Management Specialist.
Proactively assist the local Stakeholders in providing the required data and information for the annual project budgeting – the DIPA and DIPA Revision as required.
Provide financial input to the ROMS progress and other reports as requested.
Undertake other relevant activities at the request of the PC or PPMU.
Will be responsible on data verification and validation of the district level MIS reports related to Financial Progress prior to data verification and assurance by the QAS.
Position: Data Entry Operator / Administration Officer (DEAO) Location: District. Reports to: District Coordinator
The DEAO will provide data entry support for the District team and The DEAO shall meet the following minimum
The DEAO will be responsible for the following key
particularly for the personnel based at the District level. The DEAO criteria:
deliverables in accordance with specific requirements
shall coordinate with the Data Management Specialist (DMS) in relation to the establishment of consistent systems and procedures
Bachelor degree (S1), at least one (1) years
to be established by the PM and the DMS:
relevant experience, or Diploma III (D III), at
for all aspects of the district office data entry and data
least three (3) years relevant experience, or
management function, including
Relevan Vocation High Scool at least five (5)
Data Entry, document typing, formatting and designing
years relevant experience
Effective operation of the MIS systems and reporting within the respective district.
Regularly maintained and accurate MIS databases.
77
Assignment location/ Direct reporting
Scope of services
Qualifications and experience
Scanning and digitization of documents Day to day maintenance of computers and maintain data storage and record keeping In analysis of data (requires a more sophisticated person to carry out this task). Perform other organizational activities as assigned from time to time. Keeping close coordination with Senior Facilitator and District Coordinator on more technical data that requires accuracy and consistency to maintain correct and reliable reports.
In the administrative support function, the DEAO will provide administrative, bookkeeping and logistical support for the District team and particularly for the personnel based at the District level. The DEAO should coordinate with the regional-level OM in relation to the establishment of consistent systems and procedures for all
Broad capability in: (a) Implement
Reporting & deliverables
Routine periodic and specially requested MIS
MIS/database applications; (b) application of
reports.
implement with C language, (c) the use of MS Office suite of programs particularly Excel and
Other deliverables as requested by the DC or
MS Access.
DMS.
The DEAO will be responsible for the following key
The ability to work independently during the
deliverables in accordance with specific requirements
absence of the DC in the field is essential.
to be established by the PM and the regional-level
He/she shall have good attention to detail, and OM. fast and accurate typing speeds.
An efficiently run ROMS District office.
The ability to work independently during the
Office bookkeeping system.
Office filing system.
Travel bookings and ticketing.
Provide accurate, consistent and reliable data to
absence of the DC in the field is essential.
be verified, analyzed and validated correctly by
aspect of the provincial office administration.
higher levels stake holders.
Routine reports.
78
No. XII 52
Amendment No. 7
No.
EXPERT GROUP MEETING XII To allow effective sharing of the lessonlearned, 52 discussion on best practices for program implementation, quarterly progress review and strategy realignment, the CPMU will facilitate a periodic expert group meeting at national level. The expert group meeting will be conducted maximum three (3) times annually. The duration of each meeting will be three (3) days with the following main agenda: Year End‐ to evaluate the previous year program implementation, preparation of work plan and milestone for the upcoming years.
Amendment No. 8
Remarks
EXPERT GROUP MEETING No Change
Mid Quarter 2‐ to review of the current progress and formulation of the realignment strategy. Mid Quarter 3‐ to review of the current progress and formulation of the realignment strategy. 53
The expert group meeting is to be attended by the following members of the ROMS teams: Regional level: Project Manager, Financial Management Specialist, and Data Management Specialist;
53
No Change
Provincial level: Provincial Coordinator, Quality Assurance Specialist and Financial Management Assistant.
79
No. 54
Amendment No. 7 At the regional level, three bi‐monthly expert group meetings will be held after the national meeting but timed to coincide with a Monthly coordination meeting. The regional meeting will disseminate outcomes from the National Meeting and consider implications for proposed changes going forward. The regional meeting is to be attended by the following members of the ROMS teams: Regional level: Project Manager, Financial Management Specialist, and Data Management Specialist;
No.
Amendment No. 8
Remarks
No Change 54
Provincial level: Provincial Coordinator, Quality Assurance Specialist and Financial Management Assistant; District level:
55
District Coordinator, Financial Management Assistant and Data Entry Operator / Administration Officer.
At national level, the national meeting will be held by the CPMU Pamsimas in order to discuss issues related to project implementation addressing follow up action required after joint supervision meeting between the CPMU and the World Bank. The national meeting is to attended by the follow members of the ROMS teams: Regional level : Project Manager Provincial level: Provincial Coordinator.
XIII. SPOT CHECKING
No Change
XIII. SPOT CHECKING
80
No. 56.
Amendment No. 7 Program sustainability. For quality assurance and control purposes, the ROMS team will independently conduct periodic spot‐checking in accordance with the PMM and VIG (as detailed in Annex G), to ensure that the quality and due processes of each of the following key community‐based activities have been complied with. Socialization process in Village (Kelurahan) Level
No.
Amendment No. 8
Remarks
No Change 56.
and Verification Election - Selection and Verification of Village (Kelurahan) Problem identification and analysis (IMAS), Community Led Total Sanitation (CLTS) Establishment of KKM, Preparation of PJM ProAksi CAP and BPSPAM, Quality Planning of CAP Procurement of Goods-Services at Community level Infrastructure of SAM & S Results triggering (pemicuan) and Promkes Completion of Infrastructure and O & M Sustainability process
81
No. 57
58
XIV 59
Amendment No. 7 The province‐based Provincial Coordinator, Quality Assurance Specialist and Provincial Financial Management Specialist shall conduct spot‐checks on treatment villages in their respective provinces while the District Coordinator and District Financial Management Assistant shall undertake spot‐checks of the treatment villages in their respective districts. Additionally, District Coordinator and District Financial Management Assistant will conduct spot-checks each month after grant disbursement. The results of the spot checking, satisfactory or otherwise shall be used to carry out corrective action and improve the conduct of the ongoing and or future processes. Through early detection of quality problems and the various lessons‐learned and best practice principles, the spot‐checking activities are designed to support long‐term program sustainability.
No.
Amendment No. 8
57
No Change
58
No Change
FACILITATOR TRAINING XIV The PAMSIMAS program uses a number of types of 59 facilitators. These include: (a) Regular community facilitators (CFs) who are tasked with providing assistance on implementation program in the PAMSIMAS program villages;
Remarks
FACILITATOR TRAINING No Change
82
No. (b)
(c)
60 61
XV
Amendment No. 7 Senior facilitators who mentor and support the regular CFs and in addition are tasked to provide assistance to the village communities once they have entered the post program phase to ensure sustainability of the facilities and services implemented under the PAMSIMAS program; and
No.
Amendment No. 8
Remarks
STBM facilitators who are tasked to support the local health office with the district wide implementation of the national STBM program.
An outline Terms of Reference for the facilitators is contained in Annex I To improve the knowledge and skills of the facilitators, each year the PAMSIMAS program implement training for community facilitators. Under PAMSIMAS II the training for all facilitators will be provided by the ROMS in their respective regions. The training will be provided by separate training teams engaged by the ROMS on an as needed basis. The training teams will use training framework (approaches, curricula and materials etc.) developed by PAMSIMAS at the central level and applied in this manner since 2011. The central level Training and Development Services provider will provide support to the ROMS with planning and implementation of the training activities.
60
No Change
61
No Change
EXPECTED OUTPUT AND DELIVERABLES
XV
EXPECTED OUTPUT AND DELIVERABLES 83
No. 62
Amendment No. 7 The reports and other deliverables to be prepared by ROMS are listed below. Specific requirements in terms of responsibility, submission timing where appropriate are contained in Annex H. General Deliverables
No. 62
Amendment No. 8
Remarks
No Change
Village Grant technical assistance including:
Management oversight and support to the CFs during the CAP preparation, associated school and community health activities, and establishing the water supply and sanitation management unit to ensure post project sustainability, including the preparation of community agreements in the selected villages.
Technical support to the CFs and VITs with preparation of detailed engineering designs (DED) for water and institutional sanitation facilities for participating villages.
Technical support to the CFs and the community with the construction works in accordance with the approved CAP. STBM coordination and liaison with key stakeholders in relation to activities implemented by the local health offices with support from the STBM district facilitators. Village reporting: supervision guidance to the VITs and CFs in the preparation of the
84
No.
Amendment No. 7 village reports and other relevant documentation.
No.
Amendment No. 8
Remarks
Certification of the performance of CFs based on the progress of work done by CFs as a team or individuals prior each payment of the facilitators. Consultant team member performance evaluations in accordance with guidelines provided by the CMAC. Sustainability Monitoring: Timely completion of the for all villages assessed by accurate and complete data provided in the Field Books as required in accordance with the MIS Guidelines for the DPMUs. Implementation Support Mission Inputs which will comprise specific inputs on request including data, analysis, field reports and feedback on specific issues during the missions.
85
No.
Amendment No. 7 Reports Inception Report: The Inception Report will, subject to discussions with the PPMUs, DPMUs, TKPs and TKKs, establish an agreed ROMS work program which is also synchronized with the overall project requirements and importantly with the activities of separately contracted facilitator teams (CFs, senior facilitators and STBM facilitators) and the project’s capacity building agenda.
No.
Amendment No. 8
Remarks
No Change
Monthly Reports: The Monthly Reports are expected to include an overview of implementation progress against KPIs, key activities undertaken, summary details in relation to procurement, financial management, M&E/MIS status, key technical and project management issues required to be addressed for the coming month. The Monthly Report will be consolidated at the ROMS Region level but should be structured to enable them to be used by the relevant PPMUs and DPMUs. Quarterly Reports: The Quarterly Reports will consolidate the information from the Monthly Reports. The structure and content will be established by the CMAC/CPMU in order that it can be utilized as input for the Project Management Report. 86
No.
Amendment No. 7 Annual Reports: The Annual Report will be prepared consolidating information from the Monthly Reports over the Fiscal Year. The structure and content will be established by the CMAC/CPMU in order that it can be utilized as input for the Annual Consolidation of the Project Management Report.
No.
Amendment No. 8
Remarks
MIS inputs: MIS inputs will be provided in formats agreed with the CPMU/PPMU/ DPMU. Uniformity across provinces and regions is important to enable project level analysis and reporting to be completed. Special reports: As requested by the PPMUs and/or DPMUs. Draft Final Report & Final Reports: The Final Reports will be prepared at the district level and will include the completion, operation and maintenance, and exit strategy report for each district and village. The structure and format for this report will be agreed with the CPMU/CMAC and will include the specific requirements for the presentation, analysis and consolidation of data for Borrower’s Completion Report.
87
No.
Amendment No. 7
No.
63
An outline Terms of Reference for the facilitators is contained in Annex I To improve the knowledge and skills of the facilitators, each year the PAMSIMAS program implement training for community facilitators. Under PAMSIMAS II the training for all facilitators will be provided by the ROMS in their respective regions. The training will be provided by separate training teams engaged by the ROMS on an as needed basis. The training teams will use training framework (approaches, curricula and materials etc.) developed by PAMSIMAS at the central level and applied in this manner since 2011. The central level Training and Development Services provider will provide support to the ROMS with planning and implementation of the training activities.
63
No Change
64
No Change
64
Amendment No. 8
Remarks
88
AMENDMENT NO. 6 ANNEX A : PAMSIMAS II Project Components
AMENDMENT NO. 7 ANNEX A : PAMSIMAS II Project Components
REMARKS Fixed
ANNEX B : Key Performance Indicators for PAMSIMAS I ANNEX B : Key Performance Indicators for PAMSIMAS I Fixed and II and II ANNEX C : PAMSIMAS II Organization Structure
ANNEX C : PAMSIMAS II Organization Structure
Fixed
ANNEX D : PAMSIMAS II Project Locations
ANNEX D : PAMSIMAS II Project Locations
Fixed
ANNEX E : Regional Organization for Implementation Support ANNEX F : Requirements for ROMS Participation in Meetings, Workshops, Seminars and Training/Capacity Building Events
ANNEX E : Regional Organization for Implementation Support ANNEX F : Requirements for ROMS Participation in Meetings, Workshops, Seminars and Training/Capacity Building Events
Fixed
ANNEX G : Requirements for ROMS Participation in Spot Checks and CAP Reviews
ANNEX G : Requirements for ROMS Participation in Spot Checks and CAP Reviews
Fixed
ANNEX H : Key Reports and other Deliverables
ANNEX H : Key Reports and other Deliverables
Fixed
ANNEX I : Outline Terms of Reference for Facilitators
ANNEX I : Outline Terms of Reference for Facilitators
Fixed
ANNEX J : List of Key Project Documents
ANNEX J : List of Key Project Documents
Fixed
ANNEX K : Technical Requirements for Reimbursable
ANNEX K : Technical Requirements for Reimbursable
Change
ANNEX L : Terms of Reference for STBM Training
ANNEX L : Terms of Reference for STBM Training
Fixed
ANNEX M : Terms of Reference for Provincial Training for District Associations ANNEX N : Terms of Reference and Estimate Allocation Fund for “Basic Program and Pilot Program” to District SPAMS Association. ANNEX O : Terms of Reference Training Activity
ANNEX M : Terms of Reference for Provincial Training for District Associations ANNEX N : Terms of Reference and Estimate Allocation Fund for “Basic Program and Pilot Program” to District SPAMS Association. ANNEX O : Terms of Reference Training Activity
Fixed
Change
Fixed
Fixed 89
of “Badan Pengelola Sistem Penyediaan Air of “Badan Pengelola Sistem Penyediaan Air Minum Dan Sanitasi (BP-SPAMS)” to support Minum Dan Sanitasi (BP-SPAMS)” to Sustainable Management of SPAMS support Sustainable Management of SPAMS Pamsimas Program II – Year of 2015 Pamsimas II Program – Year of 2015 ANNEX P : Terms of Reference mentoring the ANNEX P : Terms of Reference mentoring the establishment of Pakem and DPMUs in the new establishment of Pakem and DPMUs in the district Pamsimas III Program - Fiscal Year of new district Pamsimas III Program - Fiscal 2016 Year of 2016 ANNEX Q : Terms of Reference for Technical Support for ANNEX Q : Terms of Reference for Technical Support the Selection of target Villges in The New for the Selection of target Villges in The District of Pamsimas III in Fiscal Year of New District of Pamsimas III in Fiscal 2016 Year of 2016 ANNEX R : Terms of Reference Senior Facilitator and Community Facilitator of Pamsimas III Program in Fiscal Year of 2016
ANNEX S : Terms of Reference Extension for Regional Oversight Management Services (ROMS) to The Provincial Project Management Units (PPMU) and District Project Management Units (DPMU) Community-Based Water Supply Project (PAMSIMAS III Program in Fiscal Year Of 2016 )
ROMS: Administration support for the payment of salaries and operational costs of facilitators [FK and FM] two (2) months implementation Additional Scope for ROMS: Extension period of services ROMS for three months (SeptemberNovember, 2016)
90
ANNEX A: PAMSIMAS II PROJECT COMPONENTS [FIXED]
91
ANNEX B: KEY PERFORMANCE INDICATORS [FIXED]
92
ANNEX C: PAMSIMAS II MANAGEMENT ORGANIZATION STRUCTURE [FIXED]
93
ANNEX D: PAMSIMAS II LOCATIONS [FIXED]
94
ANNEX E: REGIONAL PACKAGING FOR IMPLEMENTATION SUPPORT [FIXED]
95
ANNEX F: REQUIREMENTS FOR ROMS PARTICIPATION IN MEETINGS, WORKSHOPS, SEMINARS AND TRAINING/CAPACITY BUILDING EVENTS (ATTACHED)
96
ANNEX F: REQUIREMENTS FOR ROMS PARTICIPATION IN MEETINGS, WORKSHOPS, SEMINARS AND TRAINING/CAPACITY BUILDING EVENTS Annex F is provided as a basis for preparing a Bid and is subject to change over time. Annex F indicates likely requirements for ROMS participation in meetings, workshops, seminars and training/capacity building events and the likely timing of their participation. The increasingly programmatic nature of PAMSIMAS II means that there are likely to be changes to project locations and the need for training going forward. These will be confirmed as part of the annual budget process. Table F1: Indicative Training / Capacity Building Program No.
Je nis Pe latihan
TAHUN 1 Training/Event 1 Pelatihan DFMA Kab + Data Entry Operator (hanya di Tahun 1) 2 Expert Group Meeting (EGM) 3 Training/Coaching/OJT DMAC ke Fasilitator 4 Pelatihan Penguatan BPSPAMS 5 Pelatihan Kader AMPL Printing/Media 1 Spanduk (2) - per Desa (2) 2 Poster (10) - per Desa (5), per kab/kota (5), per prop (5) 3 Leaflet (4) - per Desa (25), per kab/kota (5), per prop (5) TAHUN 2 Training/Event 1 Expert Group Meeting (EGM) 2 Training/Coaching/OJT DMAC ke Fasilitator 3 Pelatihan Penguatan BPSPAMS di Kabupaten 4 Pelatihan Kader AMPL 5
Pelatihan STBM
6
Pelatihan Asosiasi SPAM Perdesaan
Printing/Media 1 Spanduk (2) - per Desa (2) 2 Poster (10) - per Desa (5), per kab/kota (5), per prop (5) 3 Leaflet (4) - per Desa (25), per kab/kota (5), per prop (5) TAHUN 3 Training/Event 1 Expert Group Meeting (EGM) 2 Training/Coaching/OJT DMAC ke Fasilitator 3 Pelatihan Penguatan BPSPAMS di Kabupaten 4 Pelatihan Kader AMPL Printing/Media 1 Spanduk (2) - per Desa (2) 2 Poster (10) - per Desa (5), per kab/kota (5), per prop (5) 3 Leaflet (4) - per Desa (25), per kab/kota (5), per prop (5) TAHUN 4 Training/Event 1 Expert Group Meeting (EGM) 2 Training/Coaching/OJT DMAC ke Fasilitator 3 Pelatihan Penguatan BPSPAMS di Kabupaten 4 Pelatihan Kader AMPL Printing/Media 1 Spanduk (2) - per Desa (2) 2 Poster (10) - per Desa (5), per kab/kota (5), per prop (5) 3 Leaflet (4) - per Desa (25), per kab/kota (5), per prop (5)
Target Audience
Frekuensi/ Tahun
FMS dan Operator (2) DMIC (3) All Fasilitator (6) BPSPAMS Kader AMPL
1 2 6 1 0
Not Implemented
2 6 0 0
Not Implemented Not Implemented
1
Additional Scope
1
Additional Scope
2 6 0 0
Not Implemented Not Implemented
2 6 0 0
Not Implemented Not Implemented
Re marks
Desa Desa+kab+prov Desa+kab+prov
DMIC (3) All Fasilitator (6) BPSPAMS Kader AMPL Sanitarian, Kader, Natural Leader, Bidan Asosiasi, FK, DC, Pemda Desa Desa+kab+prov Desa+kab+prov
DMIC (3) All Fasilitator (6) BPSPAMS Kader AMPL Desa Desa+kab+prov Desa+kab+prov
DMIC (3) All Fasilitator (6) BPSPAMS Kader AMPL Desa Desa+kab+prov Desa+kab+prov
97
ANNEX G: REQUIREMENTS FOR ROMS PARTICIPATION IN SPOT CHECKS AND CAP REVIEWS
[FIXED]
98
ANNEX H: KEY REPORTS AND DELIVERABLES [FIXED]
99
ANNEX I: OUTLINE TERMS OF REFERENCE FOR FACILITATORS
[FIXED]
100
ANNEX J.
LIST OF KEY PROJECT DOCUMENTS
[FIXED]
101
ANNEX K :
TECHNICAL REQUIREMENTS FOR DIRECT REIMBURSABLE EXPENSES (ATTACHED)
102
ANNEX K : TECHNICAL REQUIREMENTS FOR DIRECT REIMBURSABLE EXPENSES Air Transport May be used to purchase Economy Class air travel tickets by the most direct route.
Inland Transport Duty Travel May be used to purchase fuel for duty outside the City if using operational car; to pay for public transport tickets (bus) at cost. Various modes of transport provided the transport link is the most direct route utilized by commercial operators (i.e aircraft, vessels, speed boats, etc.)
Hotel Accommodation
Office Running Cost
Utilities Expenses
Communication Cost
Reporting
May be used to purchase accommodation in class melati hotel at Provincial and District Level
Office Running Cost be merged with Office Supply and Consumable
Office Running Cost, Office Supply and Consumable:
May be used for payment of telephone account, postage and internet subscription fee and Instalation for Telephone and Internet Connection
May be used for the cost of reproduction and binding of reports required in accordance with the schedule in the TOR with the following provisions:
May be used for payment of: Subscription Electricity, Water Supply, Purchase of Equipment and Materials for cleaning and sanitation of office. Purchasing materials for appropriate snacks, Buying lighting Equipment, Security Instruments, at cost.
include the purchase of ‘pulsa’ (pre-paid cellular phone vouchers). the evidence of purchase pulse can with vouchers or receipts [nota/kwitansi].
- Monthly, Quarterly, and Special Reports shall be printed on A4 80 gsm paper with soft cover binding; accompanied by a digital file (CD).
Poster & Leaflet
Poster
Leaflet
Paper
:
Size Finishing
: :
Paper
:
Size
:
Artpaper 150 gram 49 x 70 cm Laminating glossy Artpaper 150 gram A4 is folded in half (A4 dilipat dua)
- Annual Report & Final Report shall be printed on A4, 80 gsm paper with hard cover binding; accompanied by a digital file (CD).
Purchase of Office Consumable materials, materials for Computers &
103
Printer, Copy Costs excluding copying routine reports and Activity Report is done at cost
Desktop Computer (Purchase) International Branded Personal Desktop Computer (PC) with minimum specification: Core i3, 500 GB HDD, 2 GB DDR3, 512 MB VGA card, DVD RW, Original Microsoft Windows 7 Operating System (OS) with antivirus tool kit, Monitor 19"-21" LED, covering service & spare parts. Additional for Regional / Province: International Branded Personal Desktop Computer (PC) with minimum specification: Dual Core, 500 GB HDD, 2 GB DDR3 Memory, DVD RW, USB Keyboard,
Laptop/Notebook (Purchase) Notebook with minimum specification: Pentium Core i5, 500 GB HDD, 2 GB DDR3, 512 MB VGA card, DVD RW, Original Microsoft Windows 7 Operating System (OS) with antivirus tool kit, 12"-14" WXGA monitor, covering service & spare parts. Additional for District FMA: Notebook with minimum specification: Pentium Core i3, 500 GB SATA, 2 GB DDR3, 3 MB L3, DVD RW, Original Microsoft Windows 7 Operating System (OS) with antivirus tool kit, 12"14" WXGA LED, covering
Printer Laser Jet (Purchase)
Printer Colour A3 (Purchase)
International Branded Printer Laser Jet A4, 600 x 600 dpi, 30 ppm print, 2 x 250 Tray, USB port, covering service & warranty.
International Branded Printer Colour Inkjet A3, 5760 x 1440 optimised dpi, 15/15 ppm, USB, covering service & warranty.
LCD Projector (Purchase) LCD Projector with minimum specification: XGA 1024 x 768, Lumens 300 ANSI, VGA (HD15) × 2, S-Video × 1, Composite Video × 1, Audio × 2, LCD/DLP Technology, covering service & spare parts. Additional for Regional / Province: LCD Projector with minimum specification: XGA 1024 x 768, Lumens 2700 ANSI , VGA (HD15) × 2, S-Video, Composite Video, DLP Technology, covering service & Warranty.
Scanner (Purchase) International Branded Scanner with minimum specification: Flatbed colour scanner, A4 4800 x 9600 dpi, Scan 3-D Object & Photo, Hi-speed USB 2.0, covering service & spare parts. Additional for District: International Branded Scanner with minimum specification: Destop Colour Flatbed Scanner, A4 2400 x 4800 dpi, Hi-speed USB 2.0, covering service & warranty.
104
Mouse Optical, Original Microsoft Windows 7 Operating System (OS) with antivirus tool kit, Monitor 17"-19" LCD, covering service & warranty.
service & warranty.
105
Digital Camera (Purchasel)
GPS tools (Purchase)
“Point-and-shoot” digital camera with minimum specification: 10 Mega Pixel CCD sensor, 5x wide angle with optical image stabilizer, up to 4x digital zoom, RAW image recording, 2.8" LCD monitor, covering service & spare parts.
Outdoor GPS with minimum specification: - High sensitivity GPS receiver - Barometric altimeter - Electronic compass - Waterproof case - Built in base maps with ability to add maps - Display resolution 160x240 pixels, 256 level colour TFT - Interface: serial & USB - including 64 MB micro SD card - Automatic routing - 10.000 track log points & 20 saved track - Warranty covering service & spare parts . Additional for District:
Additional for District: Digital Pocket Camera with minimum specification: 14 Mega Pixel CCD sensor, up to 6x digital zoom, 3x optical zoom, External Memori minimum 8 Gb, 2-3" LCD monitor, covering service & warranty.
Outdoor GPS with minimum specification: - High sensitivity GPS receiver - Barometric altimeter - Electronic compass - Waterproof case - Display resolution 176x220 pixels, TFT transflektif, 65K colour - Memori Internal 1,7 GB, USB. - Navigasi foto - Covering service & warranty.
Theodolite (Purchase) Theodolitewith minimum specification:
Digital measurement Auto alignment Digital slope display Laser plummet to simplify setting up over a point Tripod Complete with battery, AC adapter, battery charger and adjustment wrench. Packed in a robust toolbox. covering service & warranty.
Water Test Kit (Purchase) Water test kit must be able to measure the following minimum parameters: Iron Hardness Chloride pH Turbidity
Faximale Mechine (Purchase) Ficimili laser mechine with minimum specification: 4800 x 9600 dpi, 14.4 kbps, A4, 600dpi,
Equipment Maintenance) May be used for payment of maintenance for 6 months for all project equipment at cost.
covering service & warranty.
Minimum features:
LCD display Able to operate on both 220 V mains and rechargeable battery power Fitted in a robust weather proof ABS plastic briefcase Sufficient consumables for 1 year operation. covering service & warranty.
106
Handy Talky /HT (Purchase Handy Talky minimum specification: - Frequensy VHF and UHF
Radio Rig (Purchase) Radio Rig minimum specification: -
Generator Set minimum specification:
Frequency Range: TX 144148 MHz, RX: 136-174 MHz
-
Daya Output: 1000 Watt
-
Sistem Pemanasan: Electric Start
-
Antenna Impedance: 45-50 ohms
-
Bahan Bakar: Pure Gasoline
-
Kapasitas Tangki: 13-15 Liter
-
RF Output Power
-
Lama Operasi: 13-15 Hours
-
Reactance Modulation
- LiIon battery life (stanby up to 11 hours) - Keypad Yes
Generator Set (Rent)
- Display Yes
-
Circuitry, Doble Conversion Susperheterodyne Sensitivity, less than 0.1µV
Laptop/Notebook (Rent)
Printer Desk Jet (Rent)
Additional for New District year of 2016:
Additional for New District year of 2016:
Notebook with minimum specification:
Printer deskjet with minimum specification:
Dual Core, 500 GB HDD, 2 GB DDR3, 512 MB VGA card, DVD RW, Original Microsoft Windows 7 Operating System (OS) with antivirus tool kit, 14" display, USB Porst and standard accessories.
Size A4, 600 x 600 dpi, 15 ppm print, 1 x 150 Tray, USB Porst, covering service.
107
FOR OFFICE and VEHICLE RENTAL Office Space (Rental) Vehicle (Rental) Space : 6 m2 for each person, Vehicle: 40 m2 for meeting rooms, living Region and Province : room, toilet, kitchen, warehouse, Minimum MPV 1300 CC not praying, service rooms, and older than 2012, including driver, circulation space at regional office maintenance & insurance, and provincial office, including operations cost (BBM) & furniture, Air Conditioning (AC). overhead 2 40 m for meeting rooms, living District : room, toilet, kitchen, warehouse, praying, service rooms, and circulation space at district office, including furniture
Minimum MPV 1300 CC not older than 2010, including driver, maintenance & insurance, operations cost (BBM) & overhead Additional for District: Motorcycle Type: Trail in minimum engine type: 4 stroke, SOHC, 2 valve air-cooled. Transmission: 5 speed Frame Type: semi-double-cradle tubular, length [panjang] 1800 mm, distances to the ground [jarak ke tanah] 240 mm Not older than 2011, including maintenance & insurance, operations cost (BBM) & overhead.
At Regional Level Expert Group Meeting (EGM): full board Package in minimum class melati hotel or diklat. Kits consist of writing pad, pen, copy of speaker materials, ID card for each participant.
FOR TRAINING ACTIVITY At Province Level Training for district manager program (DPMU+TKK+Satker)
At DistrictLevel Training for FM Ass. and Data Entry Operator:
full board Package in minimum class melati hotel or diklat.
full board Package in minimum class melati hotel or diklat..
Kits consist of writing pad, pen, copy of speaker materials, ID card for each participant.
Kits consist of writing pad, pen, copy of speaker materials, ID card for each participant.
Workshop forum/Asssiasi BPSPAM
Training Streghtening BPSPAM:
full board Package in minimum class melati hotel or diklat.
full board Package in minimum class melati hotel or diklat.Kits consist of writing pad, pen, copy of speaker materials, ID card for each participant.
Kits consist of writing pad, pen, copy of speaker materials, ID card for each participant.
Transportation for participant given once a training Training Kader AMPL : full board Package in minimum class melati hotel or diklat. Kits consist of writing pad, pen, copy of speaker materials, ID card for each participant. Transportation for participant given once a training OJT Fasilitator : Kits consist of writing pad, pen, copy of speaker materials, meals and snacks Workrshop RAD AMPL: Peserta ; Staff Pemda (tim penyusun RAD AMPL), DPRD,
108
pemerhati AMPL tingkat kabupaten, LSM yang beroperasi di tingkat kabupaten. Tempat ; Kantor Pemda Biaya IDR 5,000,000 lumpsum , tidak diperbolehhkan adanya uang saku dan transportasi untuk peserta
109
DAFTAR KABUPATEN PAMSIMAS III DAN RENCANA PENDAMPINGAN KAB TAHUN 2016 ROMS-2
1
Kabupaten (49) SUMATERA SELATAN
1 2 3 4 5 6 7 8 9 10 11 12 13
OGAN KOMERING ULU OGAN KOMERING ILIR MUARA ENIM LAHAT MUSI RAWAS MUSI BANYUASIN OGAN KOMERING ULU SELATAN OGAN KOMERING ULU TIMUR OGAN ILIR EMPAT LAWANG BANYU ASIN MUSI RAWAS UTARA PENUKAL ABAB PEMATANG ILIR
14 15 16 17 18 19 20 21 22
KERINCI MERANGIN SAROLANGUN BUNGO BATANG HARI MUARO JAMBI TANJUNG JABUNG BARAT TANJUNG JABUNG TIMUR TEBO
2
JAMBI
3
BENGKULU 23 24 25 26 27 28 29 30 31
BENGKULU SELATAN REJANG LEBONG KAUR KEPAHIANG BENGKULU TENGAH LEBONG MUKOMUKO SELUMA BENGKULU UTARA
32
TANGGAMUS
4
LAMPUNG
Rencana Pendamping
Jumlah Kab
Provinsi (5) No
Lama
Baru
Total
22 10 √ √ √ √ √ √ √ √ √ √
27 3
49 13
4 √ √ √ √
4 √ √ √ √
2 √
√ √ √ 5
√ √ √ √ √ 5
Tim ROMS Prov
DC ROMS
Keterangan
Sri Hartati Hendrawangsa Andri Ismadi Husein Ichwan Zamrini Andi Fai Ki Agus Lukman Ismail Helmi Soemarsono
DC OKU DC OKI DC Muara Enim DC Lahat DC Musi Rawas DC Musi Banyuasin DC OKU Selatan DC OKU Timur DC OI DC Empat Lawang PC. Sumsel FMS. Sumsel QAS. Sumsel
Sri Rubiyatul Aini Abdiun Bintara Herry Exto Tentri Sri Rubiyatul Aini Exto Tentri Abdiun Bintara Herry
DC. Kerinci DC. Bungo DC. Merangin DC. Sarolangun DC. Kerinci DC. Bungo DC. Merangin DC. Sarolangun PM. ROMS 2
Meding Mahadana Yanuar Afriadi Welisan Hendri 9
Sofiarman Pito 9 M. Sattar Nofrizen Lelly Asmiatuti Andi Yusita
√ √ √ √ √ 10
Pendamping Non ROMS
Robert Natakusuma Robert Natakusuma Rullyansyah Sridesi Altriyanti Sridesi Altriyanti
DC DC DC DC PC. Bengkulu Jambi PC. Bengkulu Jambi QAS. Bengkulu Jambi FMS. Bengkulu Jambi FMS. Bengkulu Jambi
12 Wahiduddin
DC Tanggamus
33 34 35 36 37 38 39 40 41 42 43
LAMPUNG SELATAN LAMPUNG BARAT LAMPUNG TENGAH LAMPUNG TIMUR LAMPUNG UTARA MESUJI PESAWARAN PRINGSEWU TULANG BAWANG BARAT TULANGBAWANG WAY KANAN
√
KEPULAUAN BANGKA BELITUNG 44 45 46 47 48 49
BANGKA BANGKA TENGAH BANGKA BARAT BANGKA SELATAN BELITUNG BELITUNG TIMUR
2 √ √
5
Yedi Andryansah √ √ √ √ √ √ √ √ √ √ 4
√ √ √ √
Nurhidayat Wiharnastyono Armel Wiharnastyono Meding Mahadana Yedi Andryansah Wahiduddin Welisan Hendri Armel Nurhidayat
DC Lampung Selatan FMS. Babel Lampung LGS. ROMS 2 QAS. Babel Lampung LGS. ROMS 2 PC. Sumsel DC. Lampung Selatan DC. Tanggamus QAS. Sumsel QAS. Babel Lampung FMS. Babel Lampung
6 Herman Yanti Sarmila Herman Yanti Sarmila Sawaluddin Sawaluddin
DC Bangka DC Bangka Tengah DC. Bangka DC. Bangka Tengah PC. Babel Lampung PC. Babel Lampung
ANNEX L :
TERMS OF REFERENCE FOR STBM TRAINING [FIXED]
110
ANNEX M : TERMS OF REFERENCE FOR DISTRICT ASSOCIATIONS
PROVINCE TRAINING FOR
[FIXED]
111
ANNEX N :
STANDARD OPERATIOANAL PROCEDURE FINANCIAL MANAGEMENT OF RURAL DISTRICT RURAL SPAMS ASSOCIATION, FY 2014
[FIXED]
112
ANNEX O : TERMS OF REFERENCE TRAINING ACTIVITY OF “BADAN PENGELOLA SISTEM PENYEDIAAN AIR MINUM DAN SANITASI (BP-SPAMS)” TO SUPPORT SUSTAINABLE MANAGEMENT OF SPAMS PAMSIMAS PROGRAM II – YEAR OF 2015 [FIXED]
113
ANNEX P : TERMS OF REFERENCE MENTORING THE ESTABLISHMENT OF PAKEM, DPMUs IN THE NEW DISTRICT PAMSIMAS III PROGRAM - FISCAL YEAR OF 2016 [FIXED]
114
ANNEX Q : TERMS OF REFERENCE FOR TECHNICAL SUPPORT FOR THE SELECTION OF TARGET VILLGES IN THE NEW DISTRICT OF PAMSIMAS III IN FISCAL YEAR OF 2016 [FIXED]
115
ANNEX R : TERMS OF REFERENCE SENIOR FACILITATOR AND COMMUNITY FACILITATOR OF PAMSIMAS III PROGRAM IN FISCAL YEAR OF 2016
117
KERANGKA ACUAN KERJA FASILITATOR SENIOR DAN FASILITATOR MASYARAKAT PROGRAM PAMSIMAS III Program Penyediaan Air Minum dan Sanitasi Berbasis Masyarakat (PAMSIMAS) 1. Latar Belakang Program Penyediaan Air Minum dan Sanitasi Berbasis Masyarakat (Pamsimas) telah menjadi salah satu program berbasis masyarakat untuk meningkatkan akses masyarakat perdesaan kepada air minum aman dan sanitasi layak. Program ini merupakan kolaborasi antara pemerintah pusat dan daerah, pemerintah desa, dan masyarakat. Antara Tahun 2008-2015, Pamsimas telah berhasil meningkatkan jumlah warga miskin perdesaan dan pinggiran kota yang mengakses air minum aman dan sanitasi layak, serta meningkatkan nilai dan perilaku hidup bersih dan sehat pada sekitar 12.000 desa yang tersebar di 219 kabupaten/kota. Pamsimas mendukung dua agenda nasional untuk meningkatkan cakupan penduduk terhadap pelayanan air minum dan sanitasi yang layak dan berkelanjutan, yaitu: (1) Air bersih untuk rakyat, dan (2) Sanitasi Total Berbasis Masyarakat (STBM). RPJMN 2015-2019 mengamanatkan pencapaian akses universal air minum dan sanitasi pada Tahun 2019. Dengan demikian, Pamsimas dikembangkan menjadi program nasional untuk penyediaan air minum dan sanitasi dalam rangka pencapaian target akses universal air minum dan sanitasi di wilayah perdesaan (Program 100-0-100). Mulai Tahun 2016, Pamsimas akan menjangkau tambahan 15.000 desa di lebih dari 350 kabupaten. Dukungan Pamsimas diberikan melalui pemberdayaan dan penguatan kelembagaan daerah dan desa, peningkatan perilaku hidup bersih dan sehat serta pelayanan sanitasi, penyediaan infrastruktur air minum dan sanitasi, hibah insentif tingkat desa dan kabupaten, serta dukungan pelaksanaan dan pengelolaan program. Penyediaan infrastruktur diberikan melalui tiga kegiatan, yaitu pengembangan SPAM untuk desa yang belum pernah mendapatkan bantuan Pamsimas atau bantuan SPAM lainnya, perluasan SPAM untuk pengembangan pelayanan, dan peningkatan kinerja SPAM. Pendekatan program Pamsimas di tingkat masyarakat adalah Berbasis Masyarakat, artinya program Pamsimas menempatkan masyarakat sebagai salah satu pengambil keputusan utama dan penanggung jawab kegiatan dan pengelolaan sarana air minum dan sanitasi. Untuk memastikan bahwa seluruh proses implementasi program di tingkat masyarakatdapat berjalan dengan kualitas yang baik serta mewujudkan masyarakat yang mandiri untuk mendukung keberlanjutan program, makaakan ditugaskan tenaga fasilitator dimasing-masing kabupaten peserta program Pamsimas. 2. Tenaga Pendamping Masyarakat Tenaga pendamping masyarakat Program Pamsimas terdiri dari Tim Fasilitator Masyarakat (TFM), yang dipimpin oleh 1 (satu) Fasilitator Senior (SF) dan beranggotakan maksimum 9 (sembilan) orang Fasilitator Masyarakat (FM). Khusus untuk bidang kesehatan, masyarakat dan pemerintah desa didampingi oleh Fasilitator STBM dan Sanitarian. a)
Tim Fasilitator Masyarakat (TFM). TFM mempunyai beberapa tugas utama, yaitu mendampingi masyarakat dan pemerintah desa dalam: 1.
Sosialisasi tingkat desa dan penyusunan proposal, termasuk di dalamnya adalah pendampingan kegiatan IMAS Tahap I, pembentukkan tim penyusun proposal dan kader AMPL, serta penyusunan dokumen proposal program bantuan air minum dan sanitasi yang siap diajukan kepada Pemerintah Kabupaten melalui Pokja AMPL;
2.
Perencanaan PJM ProAKSI dan perencanaan dan pelaksanaan rencana kerja masyarakat (RKM), termasuk pendampingan dalam kegiatan musyawarah masyarakat desa, pengembangan rancangan teknis SPAM, penyusunan rencana pengelolaan SPAM serta pembentukkan dan penguatan kelembagaan; 118
3.
Pendampingan dalam masa operasional dan pemeliharaan SPAM, termasuk di dalamnya adalah pemantauan dan penguatan kinerja kelembagaan, teknis dan keuangan, termasuk fasilitasi musyawarah dalam rangka peningkatan kapasitas pengelolaan, hands-on training, dan peningkatan peran dan kinerja Asosiasi BPSPAMS;
4.
Advokasi kepada pemerintah desa dan kecamatan untuk pemanfaatan APBDesa dalam rangka peningkatan kinerja dan pengembangan SPAM dalam rangka pencapaian target akses universal air minum dan sanitasi tingkat desa (100% pelayanan tingkat desa). Dalam pelaksanaan tugas ini, TFM diharapkan untuk dapat memaksimalkan kerjasama dengan Tim Pendamping Desa.
TFM mendampingi desa lama dan baru peserta Program Pamsimas. Satu TFM dapat mengkombinasikan desa-desa binaannya baik terdiri dari yang diatur berdasarkan kapasitas atau kekuatan individu fasilitator. Kinerja TFM dinilai dari: (a) Keberhasilan pendampingan pemerintah desa dan masyarakat (kualitas proses), misalnya tingkat partisipasi masyarakat, transparansi (bahwa seluruh proses dapat diakses oleh masyarakat yang lebih luas); keterlibatan perempuan dalam pengambilan keputusan, rancangan ramah anak dan difabel, serta dapat dipertanggung-jawabkan (kebenaran data dan informasi yang disampaikan); (b) Tersedianya dokumen PJM ProAKSI, RKM untuk pembangunan baru, peningkatan (atau RKM perbaikan kinerja), dan perluasan (pengembangan dalam rangka pencapaian akses aman dan sanitasi layak 100% atau RKM 100%) yang baik dan akurat; (c) Terbangunnya SPAM desa secara tepat waktu dengan kualitas teknis yang baik dan dapat dipertanggungjawabkan; (d) Terdapatnya jumlah pengguna aktual sesuai dengan target dalam RKM, dan konsisten dengan proposal desa; (e) Terdapatnya sejumlah desa yang dapat melaksanakan RKM 100% atau pengembangan dan peningkatan kualitas layanan dengan menggunakan sumber dana selain Pamsimas (misalnya APBDesa, APBD, Hibah Air Minum Perdesaan); (f) Kelembagaan tingkat desa dengan kinerja baik (KKM, Satlak, Tim Penyusun Proposal, BPSPAMS, Kader AMPL)dapat melaksanakan peran dan fungsinya. b)
Jenis Tenaga Pendamping. Jenis tenaga pendamping masyarakat terdiri dari: 1) Fasilitator Senior (FS). FS berperan sebagai koordinator TFM yang menjamin seluruh proses pendampingan dan kualitas hasil di tingkat masyarakat, menyediakan dukungan atau support kepada FM (termasuk menyediakan coaching dan bimbingan dalam pelaksanaan tugas), fasilitasi penyelesaian masalah dan koordinasi antar FM, memandu pembelajaran dan peningkatan kapasitas FM, melakukan evaluasi kinerja FM, serta mengkomunikasikan kebutuhan dan kebijakan program dari dan kepada DPMU melalui Koordinator Kabupaten ROMS. Di tingkat kabupaten, Fasilitator Senior bertugas membantu Koordinator Kabupaten dalam mengawal Asosiasi SPAMS Perdesaan, memfasilitasi dukungan dari pemda, serta memfasilitasi kemitraan. 2) Fasilitator Masyarakat (FM). FM berperan dalam membantu masyarakat untuk mengembangkan pengetahuan dan keterampilannya dalam hal teknis dan 119
kelembagaan yang dibutuhkan untuk merencanakan dan melaksanakan kegiatan program, serta pengelolaan dan pengoperasian sarana air minum, termasuk: penerapan tarif, integrasi PJM ProAKSI dengan RPJM Desa, dan RKM 100% dengan RKP Desa, dan memfasilitasi akses masyarakat kepada sumber-sumber pendanaan lain untuk membiayai RKM 100%. Untuk menjamin terjadinya pendampingan yang baik terhadap masyarakat maka TFM dibagi menjadi 3 (tiga) sub tim FM, dimana satu sub-tim FM harus terdiri dari minimal 1 (satu) orang FM-WSS dan minimal satu orang FM perempuan. Adapun jumlah dan lokasi desa yang akan didampingi oleh masing-masing sub-tim akan ditentukan oleh DPMU, DC dan FS dengan mempertimbangkan: (a) total jumlah desa baru dan desa lama di kabupaten; (b) rasio yang memadai antara jumlah sub tim dengan jumlah desa dampingan; serta (c) jarak antar desa yang akan didampingi. Secara umum satu sub-tim akan mendampingi minimal 15 desa per tahun (desa baru, desa perluasan, dan peningkatan kinerja). 3. Kualifikasi dan Lingkup Tugas Fasilitator Posisi D ur asi K o nt rak L o k a si K erj a K u al i fi k asi
Fasilitator Senior (FS) 2 Bulan Desa
Sarjana/S-1 Jurusan Teknik Lingkungan/TeknikSipil
Li ng k u p T ug as
1.
Pengalaman kerja minimal 2 tahun dalam program Pamsimas dan program pemberdayaan sejenis Usia maksimal pada saat pendaftaran adalah 50 tahun Mengendalikan pelaksanaan tugas TFM dalam pencapaian tujuan program, termasuk memberikan peningkatan kapasitas bagi TFM melalui mentoring/coaching dan bimbingan teknis serta penilaian kinerja TFM.
2.
Melakukan review dan penjaminan kualitas teknis terhadap penyusunan PJM ProAKSi, RKM (RKM desa baru, peningkatan kinerja, dan pengembangan menuju akses air minum aman 100%).
3.
Memastikan pelaksanaan RKM dan pekerjaan konstruksi SPAM di tingkat masyarakat desa berkualitas tinggi.
4.
Menjamin konstruksi SPAMS berfungsi sesuai dengan umur perencanaan teknis.
5.
Mendukung TFM dalam memfasilitasi Pemerintah Desa untuk memprioritaskan kegiatan Pembangunan AMPL (berdasarkan RKM 100%) untuk diintegrasikan kedalam RPJMDes/RKPDesdan didanai dari APBDes.
6.
Mendukung TFM dalam melakukan survei calon penerima manfaat program hibah air minum perdesaan, memverifikasi pemenuhan standar pembangunan SR, dan memastikan bahwa penerima manfaat program sesuai dengan baseline data.
7.
Mendampingi Asosiasi Pengelola SPAMS Perdesaan Tingkat Kabupaten terutama dalam peningkatan kinerja BPSPAMS dan capaian pembangunan air minum dan sanitasi (untuk kabupaten yang sudah mempunyai Asosiasi Pengelola SPAMS Perdesaan).
8.
Memastikan bahwa desa-desa Pamsimas mempunyai tingkat keberfungsian tinggi dan penerapan iuran untuk menjamin keberlanjutan SPAMS. 120
9.
Melakukan verifikasi data SIM yang dikumpulkan oleh TFM dan Asosiasi Pengelolan SPAMS, serta memeriksa laporan pekerjaan TFM.
10. Memberikan input kepada DC dan DPMU terkait dengan perencanaan, pelaksanaan dan monev program di wilayah kabupaten. 11. Membantu District Coordinator (DC) dalam mengadvokasi Pemerintah Daerah untuk memfasilitasi Pemerintah Desa guna memprioritaskan kegiatan Pembangunan AMPL. 12. Membantu DC dalam mengadvokasi Pemerintah Daerah untuk pengembangan pembangunan AMPL tingkat desa (di desa yang sudah tersusun RKM100%) melalui berbagai pembiayaan daerah, seperti DAK bidang infrastruktur air minum, DAK bidang infrastruktur sanitasi, DAK kesehatan dan DAK Infrastruktur Pembangunan Daerah, dsbnya 13. Mendorong akuntabilitas pelaksanaan pendampingan dan pelaksanaan kegiatan masyarakat melalui aplikasi PPM, serta kegiatan supervisi dan monitoring. 14. Melaporkan secara rutin seluruh hasil pekerjaan kepada DC, DPMU dan Satker PSPAM Provinsi. 15. Melaksanakan penugasan lain yang relevan sesuai permintaan dari Satker PSPAM Provinsi, DPMU dan DC. O ut pu t da n L a po r an
Hu bu ng an K erj a
Rencana Kerja Tahunanyang disetujui oleh DC dan DPMU 100% desa baru tersusun PJM ProAksi dan RKM Setiap tahunnya minimal terdapat sejumlah desa tersusun RKM 100% dan sekian desa terbiayai pengembangan SPAM PAMSIMAS melalui Dana Desa/Hibah Air Minum/DAK (Lihat di Tabel Perhitungan Target Desa dan Jumlah Fasilitator) 100% data SIM desa terisi dan terverifikasi secara tepat waktu 100% SPAM desa di desa baru berfungsi baik dan secara bertahap seluruh desa lama juga berfungsi baik 90% SPAM desadikelola dengan baik dan menerapkan tarif Jumlah laporan atau pengaduan masyarakat dalam aplikasi PPM Pamsimas yang terselesaikan Hasil verifikasi PJM ProAKSi, RKM, dan Rancangan Teknis Pengembangan SPAM 100%. Laporan bulanan, tahunan, dan khusus mencakup hasil pendampingan kepada masyarakat, pemerintah desa dan asosiasi serta pengendalian TFM Satker PSPAM Provinsi, DPMU, Satker PIP, Asosiasi, DC ROMS, Faskab STBM, Sanitarian, Pemdes, KKM, BPSPAMS, FM
Posisi D ur asi K o nt rak L o k a si K erj a K u al i fi k asi
Li ng k u p T ug as
Fasilitator Masyarakat Bidang Pemberdayaan Masyarakat (FM-CD) 2 Bulan Desa
Diploma 3 (D3), diutamakan Sarjana/S-1 Jurusan Ilmu Sosial/Ekonomi/ Kesehatan dan jurusan sejenis
Usia Maksimal pada saat pendaftaran adalah 45 tahun
Pengalaman kerja dalam program Pamsimas akan diutamakan
1. Mendampingi masyarakat dan pemerintah desa (desa baru dan lama) melakukan proses IMAS, pembentukan/revitaliasi KKM, Satlak, dan BPSPAMS, penyusunan PJM ProAksi, dan RKM (desa baru dan lama) serta 121
kajian dampak lingkungan/sosial dan rencana mitigasi yang diperlukan. 2. Mendampingi masyarakat dan pemerintah desa dalam penyusunan proposal desa, RKM, dan RKM 100% untuk dapat ikut-serta dalam program hibah air minum, atau pengembangan pelayanan SPAM menuju 100% untuk didanai melalui APBD/DAK, APBDes dan sumber dana lainnya. 3. Melakukan survei calon penerima manfaat program hibah air minum perdesaan di tingkat desa yang telah diusulkan oleh KKM kepada Pemerintah Daerah (berdasarkan baseline data) sebelum dilaksanakan pembangunan SR, melakukan verifikasi terhadap pemenuhan standar pembangunan SR, dan memastikan bahwa penerima manfaat program sesuai dengan baseline data. 4. Memastikan kehadiran dan keterwakilan warga miskin, disabilitas, perempuan dan orang tua dalam setiap rembug warga dan tindak lanjutnya 5. Melakukan peningkatan kapasitas masyarakat dan lembaga pengelola program (Pemdes, KKM, Satlak, dan BPSPAMS) dalam implementasi maupun keberlanjutan program. 6. Meningkatkan pemahaman masyarakat tentang kontribusi untuk kegiatan program, termasuk mendorong mobilisasi kontribusi masyarakat baik in-cash maupun in-kind. 7. Bersama sanitarian, memfasilitasi masyarakat terkait dengan kegiatan promosi kesehatan dan pemicuan perubahan perilaku hidup bersih untuk pencapaian SBS dan CTPS. 8. Mendampingi KKM dan pemerintah desa dalam pengawasan pelaksanaan kegiatan RKM, termasuk pelaksanaan kegiatan pelelangan, pelatihan, dan lainnya 9. Mendampingi Pemdes, KKM, Satlak, dan BPSPAMS dalam penyusunan pelaporan pelaksanaan kegiatan dan keuangan secara transparan dan akuntabel. 10. Melakukan pembinaan kepada BPSPAMS terutama dalam penyusunan rencana kerja, penguatan kelembagaan, penerapan iuran dan pengembangan serta peningkatan layanan 11. Melakukan pengumpulan data pengisian logbook SIM dan informasi terkait implementasi program, dan bertanggung jawab terhadap kelengkapan dan keakuratan data SIM. 12. Menjelaskan kepada masyarakat mengenai PPM (nomor pengaduan) serta isi dari media komunikasi secara benar dalam setiap rembug warga atau warga lainnya 13. Melaporkan setiap kemajuan pelaksanaan pendampingan kepada FS dan Satker PSPAM Provinsi 14. Penugasan lain-lain yang relevan sesuai permintaan dari Satker PSPAM Provinsi, DPMU, DC dan FS O ut pu t da n L a po r an
Rencana Kerja Pendampingan yang disetujui oleh FS dan DC Meningkatkan jumlah laporan atau pengaduan warga dalam PPM Jumlah perempuan yang terlibat dalam rembug warga minimal 30% PJM ProAKsi dan RKM tersusun pada 100% desa yang didampingi Minimal sejumlahdesa yang didampingi tersusun RKM 100%(Lihat di Tabel 122
Perhitungan Terget Desa dan Jumlah Fasilitator) Laporan hasil dan kegiatan bulanan sesuai target dalam Rencana Kerja yang disusun bersama FS Laporan hasil IMAS Laporan hasil pembentukan KKM, Satlak,danBPSPAMS Dokumen PJM ProAksi dan RKM (reguler dan 100%) Laporan hasil pemicuan CLTS dan CTPS Laporan pembinaan BPSPAMS Logbook Data SIM Satker PSPAM Provinsi, DPMU, Satker PIP, Asosiasi, DC ROMS, Faskab STBM, Sanitarian, Pemdes, KKM, BPSPAMS, FS, FM-WSS
H u bu ng a n K e rj a Posisi D ur asi K o nt rak
Fasilitator Masyarakat Bidang Pengembangan Air Minum dan Sanitasi (FM-WSS) 2 Bulan
L o k a si K erj a
Desa
Diploma 3 (D3), diutamakan Sarjana/S-1
K u al i fi k asi
Jurusan Teknik Lingkungan/ Teknik Sipil
Usia Maksimal pada saat pendaftaran adalah 45 tahun
Pengalaman kerja dalam program Pamsimas dan atau program pemberdayaan sejenis akan diutamakan Li ng k u p T ug as
1.
Mendampingimasyarakat dan pemerintah desa (desa baru dan lama) melakukan proses IMAS, pembentukan/revitaliasi KKM, Satlak, dan BPSPAMS, penyusunan PJM ProAksi, dan RKM (desa baru dan lama) serta kajian dampak lingkungan/social dan rencana mitigasi yang diperlukan.
2.
Mendampingi masyarakat dan pemerintah desa dalam penyusunan proposal desa, RKM, dan RKM 100% untuk dapat ikut-serta dalam program hibah air minum, atau pengembangan pelayanan SPAM menuju 100% untuk didanai melalui APBD/DAK, APBDes dan sumber dana lainnya.
3.
Melakukan survei calon penerima manfaat program hibah air minum perdesaan di tingkat desa yang telah diusulkan oleh KKM kepada Pemerintah Daerah (berdasarkan baseline data) sebelum dilaksanakan pembangunan SR, melakukan verifikasi terhadap pemenuhan standar pembangunan SR, dan memastikan bahwa penerima manfaat program sesuai dengan baseline data.
4.
Melakukan peningkatan kapasitas masyarakat dan lembaga pengelola program (Pemdes, KKM, Satlak, dan BPSPAMS) dalam implementasi maupun keberlanjutan program melalui pelatihan teknis WSS.
5.
Memfasilitasi masyarakat untuk memilih opsi SPAM terbaik sesuai dengan k o n d i s i setempat (kapasitas sumber air, perhitungan kebutuhan air, skala pelayanan, dan tingkat kemampuan membayar untuk biaya konstruksi, pengoperasian, dan pemeliharaan).
6.
Mendampingi KKM dan Satlak dalam penyusunan Rancangan Teknis Pengembangan SPAM menuju akses air minum aman 100% dan memenuhi aspek 4K.
7.
Mendampingi KKM dan pemerintah desa dalam pengawasan pelaksanaan kegiatan RKM, terutama dalam kegiatan konstruksi agar terjamin kualitas konstruksi SPAM di desa.
8.
Mendampingi KKM dan Satlak dalam proses pengadaan barang dan jasa di tingkat masyarakat terkait dengan konstruksi SPAMS yang akan dibangun agar sesuai dengan prosedur program, transparan dan akuntabel . 123
9.
Menjamin pelayanan air minum memenuhi aspek: kualitas, kuantitas, kontinuitas, dan keterjangkauan (4K), serta jaminan pengembangan layanan menuju 100% menggunakan Sambungan Rumah (SR).
10. Melakukan pembinaan kepada BPSPAMS terutama dalam penyusunan rencana kerja, peningkatan keberfungsian SPAMS terbangun, penyesuaian penetapan iuran dan pengembangan layanan menuju akses 100%. 11. Melakukan pengumpulan data SIM dan informasi terkait implementasi program, dan bertanggungjawab terhadap kelengkapan dan kebenaran data SIM. O ut pu t da n L a po r an
H u bu ng a n K e rj a
Rencana Kerja Pendampingan yang disetujui oleh FS dan DC Konstruksi SPAM terbangun berfungsi 100% dan memenuhi aspek kualitas, kuantitas, kontinuitas, dan keterjangkauan (4K) secara berkelanjutan Konstruksi SPAM yang berkualitas terkait dengan pemilihan material, bangunan produksi hinggan pelayanan, pemasangan dan penyambungan pipa Ketersediaan sumber air yang berkelanjutan di SPAM terbangun sesuai perencanaan teknis dan rencana pengembangan menuju 100% SPAM yang mudah dalam operasi dan pemeliharaan, serta pengembangan menuju 100% menggunakan Sambungan Rumah (SR) Rencana Anggaran Biaya yang efektif dan efisien (cost per kapita) yang mengacu pada target penerima manfaat Perhitungan biaya operasi dan pemeliharaan yang dapat diimplementasikan langsung pasca konstruksi Minimal sejumlah desa yang didampingi tersusun RKM 100% (Lihat di Tabel Perhitungan Terget Desa dan Jumlah Fasilitator) Laporan hasil dan kegiatan bulanan sesuai target dalam Rencana Kerja yang disusun bersama FS Dokumen PJM ProAKsi dan RKM tersusun pada 100% desa yang didampingi dengan kualitas tinggi Laporan hasil IMAS,KKM, Satlak,danBPSPAMS Dokumen Rancangan Teknis Pengembangan SPAM 100%. Laporan pembinaan BPSPAMS Logbook Data SIM Satker PSPAM Provinsi, DPMU, Satker PIP, Asosiasi, DC ROMS, Faskab STBM, Sanitarian, Pemdes, KKM, BPSPAMS, FS, FM-CD
4. Pengendalian Pekerjaan dan Ketentuan Kerja Fasilitator 1. Terkait dengan pengendalian dan ketentuan umum kontrak fasilitator diuraikan sebagai berikut: a. FS dan FM akan dikontrak oleh program Pamsimas melalui perusahaan Facilitator Administration Service (FAS) sesuai jangka waktu yang tertulis dalam kontrak. b. Pengendali kinerja FS dan FM adalah Satker PSPAM Provinsi, PPMU, DPMU, dan ROMS. Dasar pembayaran gaji FS dan FM adalah : (i) Time sheet FS dan FM ditandatangani oleh DPMU dan DC ROMSdan (ii) laporan bulanan yang telah diperiksa oleh DPMU dan DCROMS. c. Laporan bulanan yang berisi hasil pekerjaan FS dan FM disusun berdasarkan realisasi hasil (ouput) kegiatan pendampingan sesuai rencana kerja fasilitator yang telah disetujui oleh DPMU dan DC ROMS. Tim Fasilitator harus menyerahkan laporan bulanan kepada DC ROMS maksimal tanggal 3 pada bulan berikutnya, untuk kemudian disampaikan sebagai laporan tim pendamping kabupaten (ROMS) kepada DPMU. d. Honorarium FS dan FM meliputi gaji dasar dan biaya umum (operasional untuk bahan/ATK, komunikasi, dan transport). 124
e. Kinerja FS dan FM dievaluasi secara rutin olehSatker PSPAM Provinsi, DPMU dan DC ROMS. Pengaturan lebih lanjut mengenai tatacara evaluasi kinerja fasilitator akan mengacu pada Panduan Evaluasi Kinerja Fasilitator. f. Evaluasi kinerja FS dan FM tingkat kabupaten yang dilakukan oleh DPMU dan Koordinator Kabupaten ROMS (DC ROMS)disampaikan oleh DPMU kepada PPMU dan Satker PSPAM Provinsi. Selanjutnya PPMU menyampaikan hasil evaluasi kinerja kepada CPMU (cq. HRD TDS) sebagai dasar pertimbangan perpanjangan atau pemberhentian penugasan FS dan FM.
125
ANNEX S : TERMS OF REFERENCE EXTENSION FOR REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) to The Provincial Project Management Units (PPMU) and District Project Management Units (DPMU) Community-Based Water Supply Project (PAMSIMAS III Program in Fiscal Year Of 2016 )
126
KERANGKA ACUAN KERJA PERPANJANGAN KONTRAK KERJA UNTUK REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) PROGRAM PAMSIMAS III TA 2016 I. Latar belakang 1. Pelaksanaan program Pamsimas 2 semakin dekat selesai, status kemajuan proyek per akhir Mei 2016 dalam penyelesaian 97,10% menunjukkan intensitas perlambatan sisa kegiatan untuk Pamsimas 2. Untuk itu diperlukan upaya khusus untuk menjamin penyelesaian desa yang tersisa yaitu: 1 desa reguler untuk 2013, 17 desa reguler 2014 dan 42 desa reguler untuk 2015 (Quick status per 30 Mei 2016). 2. Program Pamsimas 3 khususnya lelang pengadaan ROMS mengalami keterlambatan, dan kemungkinan besar lelang akan dimulai pertengahan Agustus 2016. Sambil menunggu untuk tanggal penyelesaian resmi dari Program Pamsimas 2 dan target paling realistis dari lelang pengadaan ROMS program Pamimas 3 yang diperkirakan akan selesai pada akhir Oktober 2016, sedangkan berdasarkan rencana program tahunan (AWP 2016) penyelesaian Rencana Kerja Masyarakat (RKM) bulan Agustus 2016, Evaluasi RKM bulan September 2016 dan diharapkan penetapan desa sasaran bulan Oktober 2016. 3. Salah satu unsur yang terlibat dan memastikan desa terpilih adalah desa-desa yang membutuhkan bantuan program air minum dan sanitasi dan siap mengoperasikan, memelihara, dan mengembangkan sarana terbangun secara mandiri di tingkat kabupaten adalah Panitia Kemitraan (Pakem). Pakem merupakan salah satu unsur di bawah Pokja AMPL Kabupaten yang bertanggungjawab dalam pemilihan desa, dengan tujuan untuk mendapatkan daftar desa yang sesuai dengan target Pamsimas, serta memberikan rekomendasi kepada Pokja AMPL untuk mensinkronkan program dan anggaran bidang air minum dan sanitasi guna mendukung pelaksanaan Pamsimas di tingkat kabupaten. 4. Sementara Program Pamsimas 2 perlahan-lahan dapat diselesaikan, kegiatan yang berhubungan dengan Program Pamsimas 3 secara bertahap sudah mulai dilaksanakan. tentunya untuk menjamin kualitas program, tidak boleh ada kekosongan pendampingan terhadap program di lapangan. Oleh karena itu layanan ruang lingkup (Term of Reference) dari ROMS harus disesuaikan (termasuk perpanjangan layanan jasa). II. Penerapan Penyesuaian Layanan dan Lokasi Tambahan 5. Program ini akan mencakup kabupaten tambahan dan desa-desa. sejumlah besar daerah baru akan masuk dalam program, di saat Program Pamsimas 2, proyek ditargetkan 5.000 desa yang tersebar di 219 kabupaten di 32 provinsi, sedangkan di Pamsimas 3 mendatang target desa total memperluas untuk menutupi 15.000 desa di 412 kabupaten dan 33 provinsi. 6. CPMU akan terkena beban cakupan tambahan, baik dalam hal geografis dan 127
organisasi. Kabupaten baru dan desa baru dalam hal organisasi proyek dirancang dikelola oleh Satker PK PAM pada masing-masing provinsi, ini akan mengakibatkan beban kerja tambahan untuk CPMU, sebagai kabupaten baru dan atau desa baru berada di luar cakupan ROMS, saat bersamaan paket dan Satker provinsi PK PAM harus mengelola jumlah fasilitator kontrak individu dan atau konsultan kabupaten.
7. Lokasi proyek saat ini di bawah Pamsimas 2 meliput 5000 desa yang tersebar di 219 kabupaten di 32 provinsi. Untuk Pamsimas 3, desa sasaran akan diperluas untuk 15.000 desa di 413 kecamatan yang berpartisipasi yang mencakup 33 provinsi. Target pelaksanaan proyek tahunan pertama dari Pamsimas 3 adalah penyelesaian tahap review RKM. Hal ini menunjujan bahwa kabupaten baru khususnya diperlukan dukungan tertentu untuk menjamin kualitas proyek pada periode tahunan pertama Pamsimas 3. III. Lingkup Layanan (Scope of Services) 8. TOR untuk Pamsimas 2 tetap relevan, namun untuk kegiatan fase transisi (bridging) ke Pamsimas 3 harus benar-benar diperhatikan. Dalam perspektif ini, deskripsi cakupan layanan untuk ROM akan diperluas; antara lain mencakup layanan pendampingan untuk penetapan desa sasaran Pamsimas 3 (2016), pengawalan terhadap kegiatan keberlanjutan (kualitas pendampingan dan hasil kegiatan keberlanjutan tingkat desa, seperti penerapan tarif, kinerja BPSPAMS dll). IV. Periode Layanan Layanan jasa ROMS di dalam kontrak ini akan mencakup pelaksanaan PAMSIMAS III dalam waktu sekitar 39 bulan atau (perpanjangan dua setengah bulan mulai September 2016 sampai dengan akhir Nopember 2016). V. Ruang Lingkup dan Komposisi Tim ROMS (Bridging) ROMS adalah Tim Pelaksana Pamsimas Tingkat Regional, Propinsi dan Kabupaten yang salah satu fungsinya adalah mengawal pelaksanaan Pamsimas agar sesuai dengan Pedoman dan Juknis; memastikan kualitas pendampingan dan hasil di tingkat masyarakat maupun pemda; memastikan pencapaian jumlah target pemanfaat tingkat provinsi dan kabupaten; dan peningkatan kapasitas pemda dalam pengelolaan program air minum dan sanitasi berbasis masyarakat. A. Ruang Lingkup (perpanjangan kontrak) Tim ROMS memberikan dukungan kepada Unit Pengelola Program Pamsimas Tingkat Provinsi (PPMU) dan Pengelola Program Pamsimas Tingkat Kabupaten (DPMU) diantaranya adalah, namun tidak terbatas kepada: 1. Pengawalan kegiatan seleksi desa, termasuk di dalamnya penyediaan pendampingan teknis bagi Pakem serta dukungan bagi Tim Fasilitator Masyarakat (TFM), termasuk didalamnya adalah pendampingan terhadap kualitas pekerjaan fasilitator di tingkat masyarakat dan desa; 2. Dukungan teknis terhadap pelaksanaan program tingkat desa untuk menjamin kesesuaian target dan spesifikasi teknis, seperti pengawalan kegiatan tingkat desa untuk dapat dilaksanakan secara baik dan tepat waktu, evaluasi teknis terhadap RKM (termasuk kajian keuangan), pengawasan terhadap kualitas pendampingan masyarakat, pengawalan terhadap pelaksanaan pengamanan 128
sosial dan lingkungan serta gender, pengawalan terhadap kegiatan keberlanjutan (kualitas pendampingan dan hasil kegiatan keberlanjutan tingkat desa, seperti penerapan tarif, kinerja/pembinaan BPSPAMS, keberfungsian teknis, fasilitasi dana desa, dan lainnya), pendampingan terhadap KKM untuk penyelesaian Audit 2015, mendorong penambahan jumlah pengaduan dalam website Pamsimas; 3. Pengawalan terhadap sinkronisasi program dan anggaran air minum dan sanitasi perdesaan di tingkat propinsi dan kebupaten serta desa dengan Pamsimas (kebijakan dan alokasi anggaran), termasuk diantaranya adalah kepesertaan kabupaten dalam program hibah air minum perdesaan, pemanfaatan DAK PAM STBM/Kesehatan, APBDesa, serta program APBD reguler untuk air minum dan sanitasi; 4. Memberikan dukungan (back-stop) dalam rangka penyelesaian masalah terkait pelaksanaan tingkat desa, masyarakat dan kabupaten serta provinsi, termasuk di dalamnya adalah advokasi kebijakan, fasilitasi koordinasi lintas lembaga, coaching kepada TFM dan masyarakat, dan lainnya; B.
Komposisi dan Tim ROMS dapat dilihat dalam table 1 dibawah ini Table 4: ROMS Team Composition 1
Key Professional Positions [6] Regional Level
Reports to
No. of Persons
Input (personmonths)
Reports to
Per Region/ Package
Per Region/ Package
CPMU/PPMUs [1]; Project Director [2]
1
39
R1.
Project Manager (PM) [TA-A/B+]
R2.
Data Management Specialist (DMS)
PM
1
39
R3.
Local Government Specialist (LGS)
PM
1
39
R4.
Training Co-ordinator (TC) [T-A]
PM
1
39
R5.
Office Manager (OM)
PM
1
39
R6.
Supporting Staff / Operator Computer
PM
1
26
Per Province
Per Province
PPMUs [1] PM [2]
1
39
Provincial Level P1.
Provincial Coordinator (PC) [TA/B+]
P2.
Quality Assurance (QAS) [T-A/B+]
PC
1
39
P3.
Financial Management Specialist (PFMS) [T-A/B]
PC
1
39
P4.
Assistant Administration / Sekretary
PC
1
26
P5.
Assistant Provincial Coordinator (APC) -[T-B-/C]
PC
1
26
P6.
Office Boy
PC
1
26
Per District
Per District
DPMUs [1] PC [2]
1
39
DC
1
39
DC
1
39
Old District Level D1. D2. D3.
District Coordinator (DC) [T-B-/C] Financial Management Assistant (DFMA) Data Entry Operator / Administration Officer (DEAO)
129
New District Level (2016) D4.
District Coordinator (DC) [T-B-/C]
D5.
Data Entry Operator / Administration Officer (DEAO)
DPMUs [1] PC [2]
1
3
DC
1
3
130
APPENDIX. B PERSONNEL AND STAFFING SCHEDULE
(Change )
131
APPENDIX - B STAFFING SCHEDULE REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) - 2 NAME OF PERSONNEL NO
LOCATION AND POSITION
AMENDMENT No. 6
AMENDMENT No. 7
FISCAL YEAR - 2014
INPUT (MONTH)
FIRST YEAR 1
1 Regional Team 1.1 Project Manager
Sofiarman Pito
Sofiarman Pito
35
1.2 Data management
Damanuri
Damanuri
35
1.3 LG Specialist
Wiharnastiyono
Wiharnastiyono
32
Gusti Fajrianto, SE
Gusti Fajrianto, SE
21
Ainal Ikroem
Ainal Ikroem
16
Heny Kurniawati
Heny Kurniawati
26
Meding Mahadana
Meding Mahadana
25
2.1.2 Bengkulu, Jambi
Robert Irawan Natakusumah
Robert Irawan Natakusumah
35
2.1.3 Babel, Lampung
Sawaluddin
Sawaluddin
35
2.2.1 Sumatera Selatan
Yanuar Afreadi
Yanuar Afreadi
35
2.2.2 Bengkulu, Jambi
Sridesi Altryanti
Sridesi Altryanti
35
2.2.3 Babel, Lampung
Nurhidayat
Nurhidayat
35
Welisan Hendri
Welisan Hendri
35
Rullyansyah
Rullyansyah
Armel
Armel
22
Oktariani
Oktariani
26
Fitrianti
Fitrianti
20
Aldriani Putri
Aldriani Putri
26
1.4 Trainer Coordinator
8
Supporting Staff : 1.5 Office Manager 1.6 Computer Operator
16
2 Provincial Team 2.1 Provincial Coordinator 2.1.1 Sumatera Selatan
6
2.2 Financial Management Spec.
2.3 Quality Assurance Spec. 2.3.1 Sumatera Selatan 2.3.2 Bengkulu, Jambi
18
2.3.3 Babel, Lampung
14 10
2,4 Supporting Staff Provice 2.4.1 Assistant Administration South Sumatera Bengkulu - Jambi Babel - Lampung
5
2.4.2 Office Boy South Sumatera
6 2 Romadhon
Romadhon
18
FISCAL YEAR - 2015
2
3
4
5
6
7
FISCAL YEAR - 2016
SECOND YEAR 8
9
10
11
12
13
14
15
16
17
18
19
THIRD YEAR 20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
APPENDIX - B STAFFING SCHEDULE REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) - 2 NAME OF PERSONNEL NO
LOCATION AND POSITION
AMENDMENT No. 6
AMENDMENT No. 7
FISCAL YEAR - 2014
INPUT (MONTH)
FIRST YEAR 1
Bengkulu - Jambi
9 mahmudin siregar
mahmudin siregar
Babel - Lampung
16 4.5
Alexander
Alexander
20,5
M. Husain
M. Husain
Kiagus Lukman
Kiagus Lukman
Helmi
Helmi
Ikhwan Zamroni
Ikhwan Zamroni
Andri Ismadi
Andri Ismadi
Andi Fai Saputra
Andi Fai Saputra
Hendrawansa
Hendrawansa
19
Ismail Fauzi
Ismail Fauzi
35
3 District Team 3.1 District Coordinator : 3.1.1 Lahat
12
3.1.2 Ogan Komering Ulu Selatan
15
3.1.3 Ogan Ilir
20 13
3.1.4 Musi Rawas
20 15
3.1.5 Muara Enim
20 15
3.1.6 Musi Banyuasin
20 10
3.1.7 Ogan Komering Ilir 3.1.8 Ogan Komering Ulu Timur
20
25 15
3.1.9 Empat Lawang
9 5
3.1.10 Ogan Komering Ulu
Soemarsono
Soemarsono
14
Sri Hartaty
Sri Hartaty
35
3.1.11 Banyu Asin
TBN
3
3.1.12 Musi Rawas Utara
TBN
3
3.1.13 Penukal Abab Pematang Ilir
TBN
3.1.11 Kepahiang
3 16
Andi Jusita
Andi Jusita
Nofrizen
Nofrizen
Lelly Armiastuti
Lelly Armiastuti
3.1.12 Rejang Lebong
19 16
3.1.13 Kaur
19 16
3.1.14 Bengkulu Selatan
19 16 1
M Sattar
M Sattar
14
FISCAL YEAR - 2015
2
3
4
5
6
7
FISCAL YEAR - 2016
SECOND YEAR 8
9
10
11
12
13
14
15
16
17
18
19
THIRD YEAR 20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
APPENDIX - B STAFFING SCHEDULE REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) - 2 NAME OF PERSONNEL NO
LOCATION AND POSITION
AMENDMENT No. 6
AMENDMENT No. 7
FISCAL YEAR - 2014
INPUT (MONTH)
FIRST YEAR 1
3.1.15 Bengkulu Tengah
TBN
3
3.1.16 Lebong
TBN
3
3.1.17 Mukomuko
TBN
3
3.1.18 Seluma
TBN
3
3.1.19 Bengkulu Utara
TBN
3.1.20 Merangin
3 16
Abdiun Bintara
Abdiun Bintara
3.1.21 Sarolangun
19 7 7
Herri Irawan
Herri Irawan
Exto Tentri
Exto Tentri
Sri Rubiatul Aini
Sri Rubiatul Aini
19
3.1.24 Batang Hari
TBN
3
3.1.25 Muaro Jambi
TBN
3
3.1.26 Tanjung Jabung Barat
TBN
3
3.1.27 Tanjung Jabung Timur
TBN
3
3.1.28 Tebo
TBN
3.1.22 Bungo
19 13
3.1.23 Kerinci
20 13
3.1.29 Bangka Tengah
3 32
Yanti Sarmila
Yanti Sarmila
14
Irfa Jaya
Irfa Jaya
35
3.1.31 Bangka Barat
TBN
3
3.1.32 Bangka Selatan
TBN
3
3.1.33 Belitung
TBN
3
3.1.34 Belitung Timur
TBN
3
Yeddy Ardiansyah
Yeddy Ardiansyah
25
Wahiduddin
Wahiduddin
25
3.1.37 Lampung Barat
TBN
3
3.1.38 Lampung Tengah
TBN
3
3.1.39 Lampung Timur
TBN
3
3.1.40 Lampung Utara
TBN
3
3.1.41 Mesuji
TBN
3
3.1.30 Bangka
3.1.35 Lampung Selatan
9
3.1.36 Tanggamus
9
FISCAL YEAR - 2015
2
3
4
5
6
7
FISCAL YEAR - 2016
SECOND YEAR 8
9
10
11
12
13
14
15
16
17
18
19
THIRD YEAR 20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
APPENDIX - B STAFFING SCHEDULE REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) - 2 NAME OF PERSONNEL NO
LOCATION AND POSITION
AMENDMENT No. 6
AMENDMENT No. 7
FISCAL YEAR - 2014
INPUT (MONTH)
FIRST YEAR 1
3.1.42 Pesawaran
TBN
3
3.1.43 Pringsewu
TBN
3
3.1.44 Tulang Bawang Barat
TBN
3
3.1.45 Tulang Bawang
TBN
3
3.1.46 Way Kanan
TBN
3
FISCAL YEAR - 2015
2
3
4
5
6
7
FISCAL YEAR - 2016
SECOND YEAR 8
9
10
11
12
13
14
15
16
17
18
19
THIRD YEAR 20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
APPENDIX - B STAFFING SCHEDULE REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) - 2 NAME OF PERSONNEL NO
LOCATION AND POSITION
AMENDMENT No. 6
AMENDMENT No. 7
FISCAL YEAR - 2014
INPUT (MONTH)
FIRST YEAR 1
3.2 Financial Management Ass. 3.2.1 Lahat
18 Supandiansyah
Supandiansyah
15
3.2.2 Ogan Komering Ulu Selatan
Henki Irawan
Henki Irawan
35
3.2.3 Ogan Ilir
Alfishari
Alfishari
35
3.2.4 Musi Rawas
Fitri Yanti
Fitri Yanti
35
3.2.5 Muara Enim
Heni Yunisia
Heni Yunisia
35
3.2.6 Musi Banyuasin
M Ali Ridho
M Ali Ridho
35
3.2.7 Ogan Komering Ilir
Syahrul Azis
Syahrul Azis
35
3.2.8 Ogan Komering Ulu Timur
Mirawati
Mirawati
35
Mirza Heriyandi
Mirza Heriyandi
26
Ahmad Baiquni
Ahmad Baiquni
35
Yetti Afrida Indra
Yetti Afrida Indra
26
Alamsyah
Alamsyah
35
Fahrur Anam
Fahrur Anam
17
Suryaningsih
Suryaningsih
35
Sodri Renjani
Sodri Renjani
Salman Alfarisi
Salman Alfarisi
20
Fay Budi Utomo
Fay Budi Utomo
35
3.2.9 Empat Lawang 3.2.10 Ogan Komering Ulu
9
3.2.11 Kepahiang 3.2.12 Rejang Lebong
9
3.2.13 Kaur 3.2.14 Bengkulu Selatan
18
3.2.15 Bungo
18
3.2.16 Sarolangun 3.2.17 Merangin
15 15
3.2.18 Kerinci
1 3
3.2.19 Bangka Tengah
Ivan Heriyansen
Ivan Heriyansen
27
A Sony Nopian
A Sony Nopian
28
H. Herman
H. Herman
30
Julianas
Julianas
Ali Wardhana
Ali Wardhana
3.2.20 Bangka
5
3.2.21 Lampung Selatan
23
3.2.22 Tanggamus
12 18 17
FISCAL YEAR - 2015
2
3
4
5
6
7
FISCAL YEAR - 2016
SECOND YEAR 8
9
10
11
12
13
14
15
16
17
18
19
THIRD YEAR 20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
APPENDIX - B STAFFING SCHEDULE REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) - 2 NAME OF PERSONNEL NO
LOCATION AND POSITION
AMENDMENT No. 6
AMENDMENT No. 7
FISCAL YEAR - 2014
INPUT (MONTH)
FIRST YEAR 1
Data Entry Operator & 3.3 Adiministration Officer 3.3.1 Lahat
16 R.A.Fauzi Perdana
R.A.Fauzi Perdana
19
3.3.2 Ogan Komering Ulu Selatan
Abdul Harris
Abdul Harris
35
3.3.3 Ogan Ilir
Anugrah Fajar M
Anugrah Fajar M
35
3.3.4 Musi Rawas
Waka Herwandi
Waka Herwandi
35
3.3.5 Muara Enim
Herry Juliando
Herry Juliando
35
Riza Liana
Riza Liana
26
3.3.7 Ogan Komering Ilir
M Bunyamin
M Bunyamin
35
3.3.8 Ogan Komering Ulu Timur
Yudho Ariobowo
Yudho Ariobowo
35
3.3.6 Musi Banyuasin
9
3.3.9 Empat Lawang
9 10 Lisnawati
Lisnawati
14
Azwan Fiqri
Azwan Fiqri
35
3.3.11 Banyu Asin
TBN
3
3.3.12 Musi Rawas Utara
TBN
3
3.3.13 Penukal Abab Pematang Ilir
TBN
3
Yulian Susanto
Yulian Susanto
35
Nur'aini
Nur'aini
30
Sipda Juliarti
Sipda Juliarti
3.3.10 Ogan Komering Ulu
3.3.11 Kepahiang 3.3.12 Rejang Lebong
5
3.3.13 Kaur
19
3.3.14 Bengkulu Selatan
16 4 2
Hery Septawan
Hery Septawan
29
3.3.15 Bengkulu Tengah
TBN
3
3.3.16 Lebong
TBN
3
3.3.17 Mukomuko
TBN
3
3.3.18 Seluma
TBN
3
3.3.19 Bengkulu Utara
TBN
3
Nofirmansyah
Nofirmansyah
30
Padli Syahli
Padli Syahli
20
Rahmatia Putri
Rahmatia Putri
35
3.3.20 Merangin
5
3.3.21 Sarolangun 3.3.22 Bungo
9
FISCAL YEAR - 2015
2
3
4
5
6
7
FISCAL YEAR - 2016
SECOND YEAR 8
9
10
11
12
13
14
15
16
17
18
19
THIRD YEAR 20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
APPENDIX - B STAFFING SCHEDULE REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) - 2 NAME OF PERSONNEL NO
LOCATION AND POSITION
AMENDMENT No. 6
AMENDMENT No. 7
FISCAL YEAR - 2014
INPUT (MONTH)
FIRST YEAR 1
3.3.23 Kerinci
2 Sri rahayu
33
3.3.24 Batang Hari
Sri rahayu
TBN
3
3.3.25 Muaro Jambi
TBN
3
3.3.26 Tanjung Jabung Barat
TBN
3
3.3.27 Tanjung Jabung Timur
TBN
3
3.3.28 Tebo
TBN
3
Darwin
Darwin
27
Risna Ningrum
3.3.29 Bangka Tengah 3.3.30 Bangka
8 Risna Ningrum
35
3.3.31 Bangka Barat
TBN
3
3.3.32 Bangka Selatan
TBN
3
3.3.33 Belitung
TBN
3
3.3.34 Belitung Timur
TBN
3
3.3.35 Lampung Selatan
Yanita Puspitasari
Yanita Puspitasari
35
3.3.36 Tanggamus
Shella Nirmala
Shella Nirmala
35
3.3.37 Lampung Barat
TBN
3
3.3.38 Lampung Tengah
TBN
3
3.3.39 Lampung Timur
TBN
3
3.3.40 Lampung Utara
TBN
3
3.3.41 Mesuji
TBN
3
3.3.42 Pesawaran
TBN
3
3.3.43 Pringsewu
TBN
3
3.3.44 Tulang Bawang Barat
TBN
3
3.3.45 Tulang Bawang
TBN
3
3.3.46 Way Kanan
TBN
3
FISCAL YEAR - 2015
2
3
4
5
6
7
FISCAL YEAR - 2016
SECOND YEAR 8
9
10
11
12
13
14
15
16
17
18
19
THIRD YEAR 20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
APPENDIX. C SUMMARY OF COST ESTIMATE
( Amended )
132
APPENDIX. D REMUNERATION AND REIMBURSABLE COST ESTIMATES
( Amended )
133
REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) - 2 COMMUNITY BASED WATER SUPPLY PROJECT (PAMSIMAS II) ORIGINAL CONTRACT
POSITION
NO. 1
2
A
REMUNERATION
1
Regional Team
NAME
Input
Remuneration Rate [IDR]
Amount [IDR]
3
4
5
6=[4*5]
AMENDMENT No. 6
NAME
Input
Remuneration Rate [IDR]
1.584.000.000
Variant
Amount [IDR]
Varian Input
AMENDMENT No. 7
Amount [IDR]
1.662.000.000
Minimun Take Home Pay (IDR)
NAME
Input
Remuneration Rate [IDR]
32
13.800.000
441.600.000
157.500.000
Amount [IDR]
1.662.000.000
1,1 Project Manager
1
pers
x
32
month Ir. Sofiarman Pito,MM
32
Rp 13.800.000
441.600.000
Ir. Sofiarman Pito,MM
32
13.800.000
441.600.000
3
41.400.000
1,2 Data Management
1
pers
x
32
month Damanuri, S.Si
32
Rp 10.000.000
320.000.000
Damanuri, S.Si
32
10.000.000
320.000.000
3
30.000.000
8.000.000 Damanuri, S.Si
32
10.000.000
320.000.000
1,3 LG Specialist
1
pers
x
32
month Wiharnastyono, SE.Ak
32
Rp 10.000.000
320.000.000
Wiharnastyono, SE.Ak
32
10.000.000
320.000.000
3
30.000.000
8.000.000 Wiharnastyono, SE.Ak
32
10.000.000
320.000.000
1,4 Trainer Coordinator
1
pers
x
32
month Aan Juansah, ST
32
Rp 10.000.000
320.000.000
Gusti Fajrianto, SE
32
10.000.000
320.000.000
3
30.000.000
8.000.000 Gusti Fajrianto, SE
32
10.000.000
320.000.000
1
pers
x
32
month Febriyanti, SE
32
Rp
182.400.000
Febriyanti, SE
18
5.700.000
102.600.000
4.500.000 Febriyanti, SE
18
5.700.000
102.600.000
Ainal, SE
14
5.700.000
79.800.000
3
17.100.000
4.500.000 Ainal, SE
14
5.700.000
79.800.000
Heny Kurniawati
26
3.000.000
78.000.000
3
2.500.000 Heny Kurniawati
26
3.000.000
11.000.000 Ir. Sofiarman Pito,MM
Supporting Staff : 1,5 Office Manager
1,6 Computer Operator
2
1
pers
x
26
5.700.000
month
Provincial Team
3.060.000.000
3.370.500.000
9.000.000 327.375.000
78.000.000 3.370.500.000
2,1 Provincial Coordinator / LG South Sumatera
old district
1
pers
x
32
month Teddy Sister, ST. MPSDA
32
Rp 11.250.000
360.000.000
Ir. Meding Mahadana
32
11.250.000
360.000.000
3
33.750.000
9.000.000 Ir. Meding Mahadana
32
11.250.000
360.000.000
Bengkulu - Jambi
new district
1
pers
x
32
month Ir. Robert Irwan. N, M.Si
32
Rp 11.250.000
360.000.000
Ir. Robert Irawan. N, M.Si
32
11.250.000
360.000.000
3
33.750.000
9.000.000 Ir. Robert Irawan. N, M.Si
32
11.250.000
360.000.000
Babel - Lampung
new district
1
pers
x
32
month Sawaludin L. BM, S.Pd
32
Rp 11.250.000
360.000.000
Sawaludin L. BM, S.Pd
32
11.250.000
360.000.000
3
33.750.000
9.000.000 Sawaludin L. BM, S.Pd
32
11.250.000
360.000.000
2,2 Financial Management Specialist South Sumatera
old district
1
pers
x
32
month Yanuar Afreadi, SE
32
Rp
9.375.000
300.000.000
Yanuar Afreadi, SE
32
9.375.000
300.000.000
3
28.125.000
7.500.000 Yanuar Afreadi, SE
32
9.375.000
300.000.000
Bengkulu - Jambi
new district
1
pers
x
32
month Sridesi Altryanti
32
Rp
9.375.000
300.000.000
Sridesi Altryanti
32
9.375.000
300.000.000
3
28.125.000
7.500.000 Sridesi Altryanti
32
9.375.000
300.000.000
Babel - Lampung
new district
1
pers
x
32
month Nurhidayat, SE
32
Rp
9.375.000
300.000.000
Nurhidayat, SE
32
9.375.000
300.000.000
3
28.125.000
7.500.000 Nurhidayat, SE
32
9.375.000
300.000.000
South Sumatera
old district
1
pers
x
32
month Welisan Hendri, SE,Ak
32
Rp 11.250.000
360.000.000
Welisan Hendri, SE,Ak
32
11.250.000
360.000.000
3
33.750.000
9.000.000 Welisan Hendri, SE,Ak
32
11.250.000
360.000.000
Bengkulu - Jambi
new district
1
pers
x
32
month Febri Fauza, SP, MM
32
Rp 11.250.000
360.000.000
Febri Fauza, SP, MM
21
11.250.000
236.250.000
9.000.000 Febri Fauza, SP, MM
21
11.250.000
236.250.000
Rullyansyah
11
11.250.000
123.750.000
9.000.000 Rullyansyah
11
11.250.000
123.750.000
Gusti Fajrianto, SE
13
11.250.000
146.250.000
9.000.000 Gusti Fajrianto, SE
13
11.250.000
146.250.000
Armel, ST
19
11.250.000
213.750.000
3
33.750.000
9.000.000 Armel, ST
19
11.250.000
213.750.000
2,3 Quality Assurance Specialist
Babel - Lampung
new district
1
pers
x
32
month Gusti Fajrianto, SE
32
Rp 11.250.000
360.000.000
3
33.750.000
2,4 Supporting Staff Province : Assistant Administration South Sumatera
old district
1
pers
x
26
month
Oktariani
23
3.000.000
69.000.000
3
9.000.000
2.500.000 Oktariani
23
3.000.000
69.000.000
Bengkulu - Jambi
new district
1
pers
x
26
month
Fitrianti
23
3.000.000
69.000.000
3
9.000.000
2.500.000 Fitrianti
23
3.000.000
69.000.000
Babel - Lampung
new district
1
pers
x
26
month
Aldriani Putri
23
3.000.000
69.000.000
3
9.000.000
2.500.000 Aldriani Putri
23
3.000.000
69.000.000
old district
1
pers
x
26
month
Muhamad Ali
3
4.500.000
Office Boy South Sumatera
Bengkulu - Jambi
Babel - Lampung
new district
new district
1
1
pers
pers
x
x
26
26
month
month
8
1.500.000
12.000.000
Romadhon
15
1.500.000
22.500.000
Emi Juwit
10
1.500.000
15.000.000
Mahdmudin Siregar
13
1.500.000
19.500.000
6
1.500.000
8.250.000
18
1.500.000
26.250.000
3
4.500.000
12.167.200.000
327
1.650.750.000
3
25.350.000
Sandro Alexander
3
District Team
12.302.400.000
1.250.000 Muhamad Ali
3
4.500.000
8
1.500.000
12.000.000
1.250.000 Romadhon
15
1.500.000
22.500.000
1.250.000 Emi Juwit
10
1.500.000
15.000.000
1.250.000 Mahdmudin Siregar
13
1.500.000
19.500.000
6
1.500.000
8.250.000
18
1.500.000
26.250.000
1.250.000 Sandro 1.250.000 Alexander
12.811.525.000
3,1 District Coordinator 1 Lahat
old district
1
pers
x
32
month Ikhwan Zamroni, ST
32
Rp
8.450.000
270.400.000
Iwan Zamroni
15
8.450.000
126.750.000
M Husain
17
8.450.000
143.650.000
7.000.000 Iwan Zamroni
15
8.450.000
126.750.000
7.000.000 M Husain
17
8.450.000
143.650.000
REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) - 2 COMMUNITY BASED WATER SUPPLY PROJECT (PAMSIMAS II) ORIGINAL CONTRACT
POSITION
NO. 1 A
NAME
Input
Remuneration Rate [IDR]
Amount [IDR]
3
4
5
6=[4*5]
2
AMENDMENT No. 6
Variant
Input
Remuneration Rate [IDR]
Helmi
15
8.450.000
126.750.000
Ki Agus Lukman
17
8.450.000
143.650.000
Ryan Junaedi, ST
15
8.450.000
126.750.000
Helmi, ST
17
8.450.000
143.650.000
Ruliansyah, ST
15
8.450.000
126.750.000
Ikhwan Zamroni, ST
17
8.450.000
143.650.000
Hendrawansa, ST
15
8.450.000
126.750.000
Andri Ismadi
17
8.450.000
143.650.000
Ir. Meding Mahadana
10
8.450.000
84.500.000
Andi Fay Saputra
22
8.450.000
185.900.000
Kiagus Lukman, ST
16
8.450.000
135.200.000
Hendrawansa, ST
16
8.450.000
NAME
Amount [IDR]
Varian Input
AMENDMENT No. 7
Amount [IDR]
Minimun Take Home Pay (IDR)
Input
Remuneration Rate [IDR]
7.000.000 Helmi
15
8.450.000
126.750.000
7.000.000 Ki Agus Lukman
17
8.450.000
143.650.000
7.000.000 Ryan Junaedi, ST
15
8.450.000
126.750.000
7.000.000 Helmi, ST
17
8.450.000
143.650.000
7.000.000 Ruliansyah, ST
15
8.450.000
126.750.000
7.000.000 Ikhwan Zamroni, ST
17
8.450.000
143.650.000
7.000.000 Hendrawansa, ST
15
8.450.000
126.750.000
7.000.000 Andri Ismadi
17
8.450.000
143.650.000
7.000.000 Ir. Meding Mahadana
10
8.450.000
84.500.000
7.000.000 Andi Fay Saputra
22
8.450.000
185.900.000
NAME
Amount [IDR]
REMUNERATION 2 Ogan Komering Ulu Selatan
3 Ogan Ilir
4 Musi Rawas
5 Muara Enim
6 Musi Banyuasin
7 Ogan Komering Ilir
old district
old district
old district
old district
old district
old district
1
1
1
1
1
1
pers
pers
pers
pers
pers
pers
x
x
x
x
x
x
32
32
32
32
32
32
month Helmi, ST
month Ryan Junaedi, ST
month Ruliansyah, ST
month Hendrawansa, ST
month Ir. Meding Mahadana
month Kiagus Lukman, ST
32
32
32
32
32
32
Rp
Rp
Rp
Rp
Rp
Rp
8.450.000
8.450.000
8.450.000
8.450.000
8.450.000
8.450.000
270.400.000
270.400.000
270.400.000
270.400.000
270.400.000
270.400.000
3
3
3
3
25.350.000
25.350.000
25.350.000
25.350.000
3
25.350.000
7.000.000 Kiagus Lukman, ST
16
8.450.000
135.200.000
135.200.000
3
25.350.000
7.000.000 Hendrawansa, ST
16
8.450.000
135.200.000
3
25.350.000
7.000.000 Ir. Ismail Fauzi
32
8.450.000
270.400.000
7.000.000 Ruliansyah, ST
21
8.450.000
177.450.000
8 Ogan Komering Ulu Timur
old district
1
pers
x
32
month Ir. Ismail Fauzi
32
Rp
8.450.000
270.400.000
Ir. Ismail Fauzi
32
8.450.000
270.400.000
9 Empat Lawang
new district
1
pers
x
32
month Fauzi Denhas, ST
32
Rp
8.450.000
270.400.000
Ruliansyah, ST
21
8.450.000
177.450.000
Soemarsono, ST
11
8.450.000
92.950.000
3
25.350.000
7.000.000 Soemarsono, ST
11
8.450.000
92.950.000
Sri Hartaty, ST
32
8.450.000
270.400.000
3
25.350.000
7.000.000 Sri Hartaty, ST
32
8.450.000
270.400.000
10 Ogan Komering Ulu
new district
1
pers
x
32
month Sri Hartaty, ST
Banyu Asin
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Musi Rawas Utara
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Penukal Abab Pematang Ilir
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
11 Kepahiang
new district
1
pers
x
32
month Herry Irawan, ST
32
Rp
8.450.000
270.400.000
Herry Irawan, ST
16
8.450.000
135.200.000
7.000.000 Herry Irawan, ST
16
8.450.000
135.200.000
12 Rejang Lebong
new district
1
pers
x
32
month Lely Armiastuty, ST
32
Rp
8.450.000
270.400.000
Lely Armiastuty, ST
16
8.450.000
135.200.000
7.000.000 Lely Armiastuty, ST
16
8.450.000
135.200.000
Nofrizen, ST
16
8.450.000
135.200.000
7.000.000 Nofrizen, ST
16
8.450.000
135.200.000
Sri Rubiatul Aini, ST
16
8.450.000
135.200.000
7.000.000 Sri Rubiatul Aini, ST
16
8.450.000
135.200.000
Lely Armiatuty, ST
16
8.450.000
135.200.000
7.000.000 Lely Armiatuty, ST
16
8.450.000
135.200.000
Amran, ST
21
8.450.000
177.450.000
7.000.000 Amran, ST
21
8.450.000
177.450.000
M Sattar, ST
11
8.450.000
92.950.000
11
8.450.000
92.950.000
13 Kaur
14 Bengkulu Selatan
new district
new district
1
1
pers
pers
x
x
32
32
month Sri Rubiatul Aini, ST
month Abdiun Bintara, ST
32
32
32
Rp
Rp
Rp
8.450.000
8.450.000
8.450.000
270.400.000
270.400.000
270.400.000
3
3
25.350.000
25.350.000
3
25.350.000
7.000.000 M Sattar, ST
Bengkulu Tengah
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Lebong
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Mukomuko
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Seluma
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Bengkulu Utara
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
15 Merangin
new district
1
pers
x
32
month Andy Jusita, ST
32
Rp
8.450.000
270.400.000
Abdiun Bintara, ST
32
8.450.000
270.400.000
3
25.350.000
7.000.000 Abdiun Bintara, ST
32
8.450.000
270.400.000
16 Sorolangun
new district
1
pers
x
32
month Alpian Sulaiman, ST
32
Rp
8.450.000
270.400.000
Alpian Sulaiman, ST
16
8.450.000
135.200.000
7.000.000 Alpian Sulaiman, ST
16
8.450.000
135.200.000
Herry Irawan, ST
16
8.450.000
135.200.000
3
25.350.000
7.000.000 Herry Irawan, ST
16
8.450.000
135.200.000
Dhandy Hartito, ST
15
8.450.000
126.750.000
7.000.000 Dhandy Hartito, ST
15
8.450.000
126.750.000
Exto Tentri, ST
17
8.450.000
143.650.000
7.000.000 Exto Tentri, ST
17
8.450.000
143.650.000
Amran, ST
16
8.450.000
135.200.000
7.000.000 Amran, ST
16
8.450.000
135.200.000
Sri Rubiatul Aini, ST
16
8.450.000
135.200.000
7.000.000 Sri Rubiatul Aini, ST
16
8.450.000
135.200.000
Ir. Khairul Zanzibar
21
8.450.000
177.450.000
7.000.000 Ir. Khairul Zanzibar
21
8.450.000
177.450.000
Yanti Sarmila, ST
11
8.450.000
92.950.000
3
25.350.000
7.000.000 Yanti Sarmila, ST
11
8.450.000
92.950.000
3
25.350.000
7.000.000 Ir. Irfa Jaya
32
8.450.000
270.400.000
7.000.000 Munawar Sukohati, ST
10
8.450.000
84.500.000
17 Bungo
18 Kerinci
19 Bangka Tengah
new district
new district
new district
1
1
1
pers
pers
pers
x
x
x
32
32
32
month Dhandy Hartito, ST
month Amran, ST
month Ir. Khairul Zanzibar
32
32
32
Rp
Rp
Rp
8.450.000
8.450.000
8.450.000
270.400.000
270.400.000
270.400.000
20 Bangka
new district
1
pers
x
32
month Ir. Irfa Jaya
32
Rp
8.450.000
270.400.000
Ir. Irfa Jaya
32
8.450.000
270.400.000
21 Lampung Selatan
new district
1
pers
x
32
month Munawar Sukohati, ST
32
Rp
8.450.000
270.400.000
Munawar Sukohati, ST
10
8.450.000
84.500.000
3
3
25.350.000
25.350.000
REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) - 2 COMMUNITY BASED WATER SUPPLY PROJECT (PAMSIMAS II) ORIGINAL CONTRACT
POSITION
NO. 1 A
NAME
Input
Remuneration Rate [IDR]
Amount [IDR]
3
4
5
6=[4*5]
2
AMENDMENT No. 6
Variant
NAME
Input
Remuneration Rate [IDR]
Yeddy Ardiansyah
22
8.450.000
185.900.000
Sumarsono
10
8.450.000
84.500.000
Wahiduddin
22
8.450.000
185.900.000
Pendra Dwipa
19
5.525.000
104.975.000
Supandiansyah
13
5.525.000
Amount [IDR]
Varian Input
AMENDMENT No. 7
Amount [IDR]
Minimun Take Home Pay (IDR)
NAME
Input
Remuneration Rate [IDR]
7.000.000 Yeddy Ardiansyah
22
8.450.000
7.000.000 Sumarsono
10
8.450.000
84.500.000
7.000.000 Wahiduddin
22
8.450.000
185.900.000
104.975.000
Amount [IDR]
REMUNERATION
22 Tanggamus
new district
1
pers
x
32
month M. Azhar, ST
32
Rp
8.450.000
270.400.000
3
25.350.000
185.900.000
3
25.350.000
4.500.000 Pendra Dwipa
19
5.525.000
71.825.000
3
16.575.000
4.500.000 Supandiansyah
13
5.525.000
71.825.000
3,2 Financial Management Assistant 1 Lahat
old district
1
pers
x
32
month Pendra Dwipa
32
Rp
5.525.000
176.800.000
2 Ogan Komering Ulu Selatan
old district
1
pers
x
32
month Hengki Irawan
32
Rp
5.525.000
176.800.000
Hengki Irawan
32
5.525.000
176.800.000
3
16.575.000
4.500.000 Hengki Irawan
32
5.525.000
176.800.000
3 Ogan Ilir
old district
1
pers
x
32
month Alfisyahri
32
Rp
5.525.000
176.800.000
Alfisyahri
32
5.525.000
176.800.000
3
16.575.000
4.500.000 Alfisyahri
32
5.525.000
176.800.000
4 Musi Rawas
old district
1
pers
x
32
month Fitriyanti
32
Rp
5.525.000
176.800.000
Fitriyanti
32
5.525.000
176.800.000
3
16.575.000
4.500.000 Fitriyanti
32
5.525.000
176.800.000
5 Muara Enim
old district
1
pers
x
32
month Heni Yunisa
32
Rp
5.525.000
176.800.000
Heni Yunisa
32
5.525.000
176.800.000
3
16.575.000
4.500.000 Heni Yunisa
32
5.525.000
176.800.000
6 Musi Banyuasin
old district
1
pers
x
32
month M. Ali Ridho
32
Rp
5.525.000
176.800.000
M. Ali Ridho
32
5.525.000
176.800.000
3
16.575.000
4.500.000 M. Ali Ridho
32
5.525.000
176.800.000
7 Ogan Komering Ilir
old district
1
pers
x
32
month Syahrul Aziz
32
Rp
5.525.000
176.800.000
Syahrul Aziz
32
5.525.000
176.800.000
3
16.575.000
4.500.000 Syahrul Aziz
32
5.525.000
176.800.000
8 Ogan Komering Ulu Timur
old district
1
pers
x
32
month Mirawati
32
Rp
5.525.000
176.800.000
Mirawati
32
5.525.000
176.800.000
3
16.575.000
4.500.000 Mirawati
32
5.525.000
176.800.000
9 Empat Lawang
new district
1
pers
x
32
month M. Sudharmono
32
Rp
5.525.000
176.800.000
M. Sudharmono
9
5.525.000
49.725.000
4.500.000 M. Sudharmono
9
5.525.000
49.725.000
Mirza Heriyandi
23
5.525.000
127.075.000
3
16.575.000
4.500.000 Mirza Heriyandi
23
5.525.000
127.075.000
10 Ogan Komering Ulu
new district
1
pers
x
32
month Katri Gentari
32
Rp
5.525.000
176.800.000
Ahmad Baiquni, SE
32
5.525.000
176.800.000
3
16.575.000
4.500.000 Ahmad Baiquni, SE
32
5.525.000
176.800.000
11 Kepahiang
new district
1
pers
x
32
month Ali Makruf
32
Rp
5.525.000
176.800.000
Yetti Aprida
32
5.525.000
176.800.000
3
16.575.000
4.500.000 Yetti Aprida
32
5.525.000
176.800.000
12 Rejang Lebong
new district
1
pers
x
32
month Suryaningsih. SE
32
Rp
5.525.000
176.800.000
Alamsyah
32
5.525.000
176.800.000
3
16.575.000
4.500.000 Alamsyah
32
5.525.000
176.800.000
13 Kaur
new district
1
pers
x
32
month Alamsyah
32
Rp
5.525.000
176.800.000
Alamsyah
18
5.525.000
99.450.000
4.500.000 Alamsyah
18
5.525.000
99.450.000
Fahrul Anam
14
5.525.000
77.350.000
3
16.575.000
4.500.000 Fahrul Anam
14
5.525.000
77.350.000
14 Bengkulu Selatan
new district
1
pers
x
32
month Akhmad Marwansyah
32
Rp
5.525.000
176.800.000
Suryaningsih. SE
32
5.525.000
176.800.000
3
16.575.000
4.500.000 Suryaningsih. SE
32
5.525.000
176.800.000
15 Merangin
new district
1
pers
x
32
month Darsin
32
Rp
5.525.000
176.800.000
Fay Budi Utomo
32
5.525.000
176.800.000
3
16.575.000
4.500.000 Fay Budi Utomo
32
5.525.000
176.800.000
16 Sorolangun
new district
1
pers
x
32
month Dodi Indrianto
32
Rp
5.525.000
176.800.000
Irawan Usman
15
5.525.000
82.875.000
4.500.000 Irawan Usman
15
5.525.000
82.875.000
Salman Farizi
17
5.525.000
93.925.000
4.500.000 Salman Farizi
17
5.525.000
93.925.000
Eni setyaningrum
20
5.525.000
110.500.000
4.500.000 Eni setyaningrum
20
5.525.000
110.500.000
Sodri Renjani
12
5.525.000
66.300.000
4.500.000 Sodri Renjani
12
5.525.000
66.300.000
8
5.525.000
44.200.000
8
5.525.000
44.200.000
24
5.525.000
132.600.000
24
5.525.000
132.600.000
17 Bungo
new district
1
pers
x
32
month Eni setyaningrum
32
Rp
5.525.000
176.800.000
18 Kerinci
new district
1
pers
x
32
month Achriza Himawan
32
Rp
5.525.000
176.800.000
Achriza Himawan Ivan Heriyansen
3
3
16.575.000
16.575.000
4.500.000 Achriza Himawan 3
16.575.000
4.500.000 Ivan Heriyansen
Batang Hari
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Muaro Jambi
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Tanjung Jabung Barat
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Tanjung Jabung Timur
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Tebo
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
new district
1
pers
x
32
month Nining Wahidah
4.500.000 Nining Wahidah
7
5.525.000
38.675.000
25
5.525.000
138.125.000
19 Bangka Tengah
32
Rp
5.525.000
176.800.000
Nining Wahidah Sonny Nopian
20 Bangka
new district
1
pers
x
32
month Reni Maryuni
32
Rp
5.525.000
176.800.000
Reni Maryuni H Herman
7
5.525.000
38.675.000
25
5.525.000
138.125.000
5
5.525.000
27.625.000
27
5.525.000
149.175.000
3
16.575.000
4.500.000 Sonny Nopian
3
16.575.000
4.500.000 H Herman
4.500.000 Reni Maryuni
5
5.525.000
27.625.000
27
5.525.000
149.175.000
Bangka Barat
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Bangka Selatan
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Belitung
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Belitung Timur
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) - 2 COMMUNITY BASED WATER SUPPLY PROJECT (PAMSIMAS II) ORIGINAL CONTRACT
POSITION
NO. 1 A
NAME
Input
Remuneration Rate [IDR]
Amount [IDR]
3
4
5
6=[4*5]
2
AMENDMENT No. 6
NAME
Input
Remuneration Rate [IDR]
Variant
Amount [IDR]
Varian Input
AMENDMENT No. 7
Amount [IDR]
Minimun Take Home Pay (IDR)
Input
Remuneration Rate [IDR]
4.500.000 Didik Hariyanto
23
5.525.000
127.075.000
4.500.000 Lufianas
12
5.525.000
66.300.000
4.500.000 Sofyan
18
5.525.000
99.450.000
4.500.000 Ali Wardhana
14
5.525.000
77.350.000
NAME
Amount [IDR]
REMUNERATION
21 Lampung Selatan
22 Tanggamus
new district
new district
1
1
pers
pers
x
x
32
32
month Didik Hariyanto
month Sofyan
32
32
Rp
Rp
5.525.000
5.525.000
176.800.000
176.800.000
Didik Hariyanto
23
5.525.000
127.075.000
Lufianas
9
5.525.000
49.725.000
Sofyan
18
5.525.000
99.450.000
Ali Wardhana
14
5.525.000
77.350.000
3
16.575.000
3
16.575.000
Lampung Barat
new district
1
pers
x
3
month
3
16.575.000
TBN
3
5.525.000
16.575.000
Lampung Tengah
new district
1
pers
x
3
month
3
16.575.000
TBN
3
5.525.000
16.575.000
Lampung Timur
new district
1
pers
x
3
month
3
16.575.000
TBN
3
5.525.000
16.575.000
Lampung Utara
new district
1
pers
x
3
month
3
16.575.000
TBN
3
5.525.000
16.575.000
Mesuji
new district
1
pers
x
3
month
3
16.575.000
TBN
3
5.525.000
16.575.000
Pesawaran
new district
1
pers
x
3
month
3
16.575.000
TBN
3
5.525.000
16.575.000
Pringsewu
new district
1
pers
x
3
month
3
16.575.000
TBN
3
5.525.000
16.575.000
Tulang Bawang Barat
new district
1
pers
x
3
month
3
16.575.000
TBN
3
5.525.000
16.575.000
Tulang Bawang
new district
1
pers
x
3
month
3
16.575.000
TBN
3
5.525.000
16.575.000
Way Kanan
new district
1
pers
x
3
month
3
16.575.000
TBN
3
5.525.000
16.575.000
1
pers
x
32
month Agung Rizky
56.000.000
3,3 Supporting Staff Data Entry Operator / Administration Officer 1 Lahat
old district
32
Rp
3.500.000
112.000.000
Agung Rizky
16
3.500.000
56.000.000
2.750.000 Agung Rizky
16
3.500.000
Fauzi Perdana
16
3.500.000
56.000.000
3
10.500.000
2.750.000 Fauzi Perdana
16
3.500.000
56.000.000
2 Ogan Komering Ulu Selatan
old district
1
pers
x
32
month Abdul Haris
32
Rp
3.500.000
112.000.000
Abdul Haris
32
3.500.000
112.000.000
3
10.500.000
2.750.000 Abdul Haris
32
3.500.000
112.000.000
3 Ogan Ilir
old district
1
pers
x
32
month Anugrah Fajar
32
Rp
3.500.000
112.000.000
Anugrah Fajar
32
3.500.000
112.000.000
3
10.500.000
2.750.000 Anugrah Fajar
32
3.500.000
112.000.000
4 Musi Rawas
old district
1
pers
x
32
month Waka Herwandi
32
Rp
3.500.000
112.000.000
Waka Herwandi
32
3.500.000
112.000.000
3
10.500.000
2.750.000 Waka Herwandi
32
3.500.000
112.000.000
5 Muara Enim
old district
1
pers
x
32
month Heri Julianto
32
Rp
3.500.000
112.000.000
Heri Julianto
32
3.500.000
112.000.000
3
10.500.000
2.750.000 Heri Julianto
32
3.500.000
112.000.000
6 Musi Banyuasin
old district
1
pers
x
32
month Nurdin
32
Rp
3.500.000
112.000.000
Nurdin
9
3.500.000
31.500.000
9
3.500.000
31.500.000
Riza Liana
23
3.500.000
80.500.000
3
10.500.000
2.750.000 Riza Liana
23
3.500.000
80.500.000
2.750.000 Nurdin
7 Ogan Komering Ilir
old district
1
pers
x
32
month M. Bunyamin
32
Rp
3.500.000
112.000.000
M. Bunyamin
32
3.500.000
112.000.000
3
10.500.000
2.750.000 M. Bunyamin
32
3.500.000
112.000.000
8 Ogan Komering Ulu Timur
old district
1
pers
x
32
month Yudho Ariwibowo
32
Rp
3.500.000
112.000.000
Yudho Ariwibowo
32
3.500.000
112.000.000
3
10.500.000
2.750.000 Yudho Ariwibowo
32
3.500.000
112.000.000
9 Empat Lawang
new district
1
pers
x
32
month Muhamad faisal
32
Rp
3.500.000
112.000.000
Muhamad faisal
21
3.500.000
73.500.000
2.750.000 Muhamad faisal
21
3.500.000
73.500.000
Lisnawati
11
3.500.000
38.500.000
3
10.500.000
2.750.000 Lisnawati
11
3.500.000
38.500.000
Junaidi
32
3.500.000
112.000.000
3
10.500.000
2.750.000 Junaidi
32
3.500.000
112.000.000
10 Ogan Komering Ulu
new district
1
pers
x
32
month Junaidi
Banyu Asin
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Musi Rawas Utara
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Penukal Abab Pematang Ilir
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
11 Kepahiang
new district
1
pers
x
32
month Benny Adriansyah
32
Rp
3.500.000
112.000.000
Benny Adriansyah
3
10.500.000
2.750.000 Benny Adriansyah
32
3.500.000
112.000.000
12 Rejang Lebong
new district
1
pers
x
32
month Suhermansah
32
Rp
3.500.000
112.000.000
Suhermansah
3
10.500.000
13 Kaur
14 Bengkulu Selatan
new district
new district
1
1
pers
pers
x
x
32
32
month Syehdani Thamrin
month Yeni Yusnidar
32
32
32
Rp
Rp
Rp
3.500.000
3.500.000
3.500.000
112.000.000
112.000.000
112.000.000
32
3.500.000
112.000.000
5
3.500.000
17.500.000
Nuraeni
27
3.500.000
94.500.000
Syehdani Thamrin
19
3.500.000
66.500.000
Sipda Juliarti
13
3.500.000
45.500.000
Yeni Yusnidar
6
3.500.000
21.000.000
26
3.500.000
91.000.000
Herry Septawan
2.750.000 Suhermansah
3
10.500.000
5
3.500.000
17.500.000
2.750.000 Nuraeni
27
3.500.000
94.500.000
2.750.000 Syehdani Thamrin
19
3.500.000
66.500.000
2.750.000 Sipda Juliarti
13
3.500.000
45.500.000
2.750.000 Yeni Yusnidar
6
3.500.000
21.000.000
26
3.500.000
91.000.000
3
10.500.000
2.750.000 Herry Septawan
Bengkulu Tengah
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Lebong
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) - 2 COMMUNITY BASED WATER SUPPLY PROJECT (PAMSIMAS II) ORIGINAL CONTRACT
POSITION
NO. 1 A
2
NAME
Input
Remuneration Rate [IDR]
Amount [IDR]
3
4
5
6=[4*5]
AMENDMENT No. 6
NAME
Input
Remuneration Rate [IDR]
Variant
Amount [IDR]
Varian Input
AMENDMENT No. 7
Amount [IDR]
Minimun Take Home Pay (IDR)
NAME
Input
Remuneration Rate [IDR]
Amount [IDR]
REMUNERATION Mukomuko
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Seluma
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Bengkulu Utara
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
new district
1
pers
x
32
month Neny Wahyuni
2.750.000 Neny Wahyuni
5
3.500.000
17.500.000
2.750.000 Nofirmansyah
27
3.500.000
94.500.000
2.750.000 Nopian Bhakti
15
3.500.000
52.500.000
2.750.000 Padli Syahli
17
3.500.000
59.500.000
2.750.000 Denok Wahtuni
21
3.500.000
73.500.000
2.750.000 Sodri
11
3.500.000
38.500.000
2.750.000 Antoni
2
3.500.000
7.000.000
30
3.500.000
105.000.000
15 Merangin
16 Sorolangun
17 Bungo
18 Kerinci
new district
new district
new district
1
1
1
pers
pers
pers
x
x
x
32
32
32
month Nopian Bhakti
month Denok Wahtuni
month Antoni
32
32
32
32
Rp
Rp
Rp
Rp
3.500.000
3.500.000
3.500.000
3.500.000
112.000.000
112.000.000
112.000.000
112.000.000
Neny Wahyuni
5
3.500.000
17.500.000
Nofirmansyah
27
3.500.000
94.500.000
Nopian Bhakti
15
3.500.000
52.500.000
Padli Syahli
17
3.500.000
59.500.000
Denok Wahtuni
21
3.500.000
73.500.000
Sodri
11
3.500.000
38.500.000
Antoni
2
3.500.000
7.000.000
30
3.500.000
105.000.000
Sri Rahayu
3
3
3
10.500.000
10.500.000
10.500.000
3
10.500.000
2.750.000 Sri Rahayu
Batang Hari
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Muaro Jambi
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Tanjung Jabung Barat
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Tanjung Jabung Timur
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Tebo
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
new district
1
pers
x
32
month Yuyun Yulianti
2.750.000 Yuyun Yulianti
8
3.500.000
28.000.000
19 Bangka Tengah
20 Bangka
32
32
Rp
Rp
3.500.000
3.500.000
112.000.000
112.000.000
Yuyun Yulianti
8
3.500.000
28.000.000
Darwin
24
3.500.000
84.000.000
3
10.500.000
2.750.000 Darwin
24
3.500.000
84.000.000
Risna Ningrum
32
3.500.000
112.000.000
3
10.500.000
2.750.000 Risna Ningrum
32
3.500.000
112.000.000
new district
1
pers
x
32
month Oksri Rakhmadi
Bangka Barat
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Bangka Selatan
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Belitung
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Belitung Timur
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
21 Lampung Selatan
new district
1
pers
x
32
month Fitria Susanti
32
Rp
3.500.000
112.000.000
Yanita Puspitasari
32
3.500.000
112.000.000
3
10.500.000
2.750.000 Yanita Puspitasari
32
3.500.000
112.000.000
22 Tanggamus
32
Rp
3.500.000
112.000.000
Shella Nurmala
32
3.500.000
112.000.000
new district
1
pers
x
32
month Muhamad Asmuni
3
10.500.000
2.750.000 Shella Nurmala
32
3.500.000
112.000.000
Lampung Barat
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Lampung Tengah
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Lampung Timur
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Lampung Utara
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Mesuji
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Pesawaran
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Pringsewu
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Tulang Bawang Barat
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Tulang Bawang
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
Way Kanan
new district
1
pers
x
3
month
3
10.500.000
2.750.000 TBN
3
3.500.000
10.500.000
TOTAL REMUNERATION [1+2+3]
16.946.400.000
17.199.700.000
17.844.025.000
REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) - 2 COMMUNITY BASED WATER SUPPLY PROJECT (PAMSIMAS II) CONTRACT DESCRIPTION
NO.
B
DUTY TRAVEL (TARGETED VILLAGE 2014)
1.1 Spot Checking 1.1.1 Provincial Team - Province to District to Village (targeted village 2014) Province Bengkulu & Jambi Inland Transport Accomodation OSA
1.1.2
Unit Rate [IDR]
AMENDMENT NO. 6
Amount [IDR]
Vol.
Unit Rate [IDR]
Amount [IDR]
VARIANT Vol
Unit Rate [IDR]
AMENDMENT NO. 7
Amount [IDR]
Vol.
Unit Rate [IDR]
Remarks Amount [IDR]
2
REIMBURSABLE COST 1
Vol.
996.840.000
3 3 3
person person person
72 72 72
village village village
10% 10% 10%
3 3 3
years years years
2 time 2 time 2 time
x x
2 3
days days
130 259 389
Spot Checking for Jan - October 2014 Inland Transport Accomodation OSA
3 3 3
person person person
72 72 72
village village village
10% 10% 10%
10 10 10
months months months
2 time 2 time 2 time
x x
2 3
days days
60 120 180
Spot Checking for Nopember 2014 Inland Transport Accomodation OSA
3 3 3
person person person
72 72 72
village village village
10% 10% 10%
1 1 1
months months months
2 time 2 time 2 time
x x
2 3
days days
Province Babel & Lampung Inland Transport Accomodation OSA
3 3 3
person person person
32 32 32
village village village
10% 10% 10%
3 3 3
years years years
2 time 2 time 2 time
x x
2 3
days days
58 115 173
Spot Checking for Jan - October 2014 Inland Transport Accomodation OSA
3 3 3
person person person
32 32 32
village village village
10% 10% 10%
10 10 10
months months months
2 time 2 time 2 time
x x
2 3
days days
60 120 180
Spot Checking for Nopember 2014 Inland Transport Accomodation OSA
3 3 3
person person person
32 32 32
village village village
10% 10% 10%
1 1 1
months months months
2 time 2 time 2 time
x x
2 3
days days
Province Sumatera Selatan Inland Transport Accomodation OSA
3 3 3
person person person
180 180 180
village village village
10% 10% 10%
3 3 3
years years years
2 time 2 time 2 time
x x
2 3
days days
324 648 972
Spot Checking for Jan - October 2014 Inland Transport Accomodation OSA
3 3 3
person person person
180 180 180
village village village
10% 10% 10%
10 10 10
months months months
2 time 2 time 2 time
x x
2 3
days days
60 120 180
Spot Checking for Nopember 2014 Inland Transport Accomodation OSA
3 3 3
person person person
180 180 180
village village village
10% 10% 10%
1 1 1
months months months
2 time 2 time 2 time
x x
2 3
days days
District Team - District to Village (targeted vallage 2014) District Coordinator Provincial Bengkulu District Coordinator Provincial Jambi District Coordinator Provincial Babel District Coordinator Provincial Sumatera Selatan District Coordinator Provincial Lampung Financial Management Ass. Provincial Bengkulu Financial Management Ass. Provincial Jambi Financial Management Ass. Provincial Babel Financial Management Ass. Provincial Sumatera Selatan Financial Management Ass. Provincial Lampung
3 6 3 10 1 3 10 9 2 10
district district district district district district district district district district
24 48 24 180 8 24 48 24 180 8
village village village village village village village village village village
50% 50% 50% 50% 50% 50% 50% 50% 50% 50%
3 3 3 3 3 3 3 3 3 3
years years years years years years years years years years
10 10 10 10 10 8 8 8 8 8
time time time time time time time time time time
360 720 360 2.700 120 288 576 288 2.160 96
Spot Checking for Jan - October 2014 District Coordinator Provincial Bengkulu District Coordinator Provincial Jambi District Coordinator Provincial Babel District Coordinator Provincial Sumatera Selatan District Coordinator Provincial Lampung Financial Management Ass. Provincial Bengkulu Financial Management Ass. Provincial Jambi Financial Management Ass. Provincial Babel
4 4 2 10 2 4 4 2
district district district district district district district district
24 48 24 180 8 24 48 24
village village village village village village village village
50% 50% 50% 50% 50% 50% 50% 50%
10 10 10 10 10 10 10 10
months months months months months months months months
5 5 5 5 5 3 3 3
time time time time time time time time
200 200 100 500 100 120 120 60
200.000 200.000 200.000
200.000 200.000 200.000
200.000 200.000 200.000
50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000
334.400.000
-
334.400.000
25.920.000 51.840.000 77.760.000
Fixed Rate
60 120 180
200.000 200.000 200.000
12.000.000 24.000.000 36.000.000
60 120 180
200.000 200.000 200.000
12.000.000 24.000.000 36.000.000
6 12 18
200.000 200.000 200.000
1.200.000 2.400.000 3.600.000
6 12 18
200.000 200.000 200.000
1.200.000 2.400.000 3.600.000
60 120 180
200.000 200.000 200.000
12.000.000 24.000.000 36.000.000
60 120 180
200.000 200.000 200.000
12.000.000 24.000.000 36.000.000
6 12 18
200.000 200.000 200.000
1.200.000 2.400.000 3.600.000
6 12 18
200.000 200.000 200.000
1.200.000 2.400.000 3.600.000
60 120 180
200.000 200.000 200.000
12.000.000 24.000.000 36.000.000
60 120 180
200.000 200.000 200.000
12.000.000 24.000.000 36.000.000
6 12 18
200.000 200.000 200.000
1.200.000 2.400.000 3.600.000
6 12 18
200.000 200.000 200.000
1.200.000 2.400.000 3.600.000
200 200 100 500 100 120 120 60
50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000
10.000.000 10.000.000 5.000.000 25.000.000 5.000.000 6.000.000 6.000.000 3.000.000
200 200 100 500 100 120 120 60
50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000
10.000.000 10.000.000 5.000.000 25.000.000 5.000.000 6.000.000 6.000.000 3.000.000
11.520.000 23.040.000 34.560.000
64.800.000 129.600.000 194.400.000
18.000.000 36.000.000 18.000.000 135.000.000 6.000.000 14.400.000 28.800.000 14.400.000 108.000.000 4.800.000
Fixed Rate
CONTRACT DESCRIPTION
NO.
Vol.
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 6 Vol.
Unit Rate [IDR]
Amount [IDR]
300 60
50.000 50.000
20 20 10 50 10 12 12 6 30 6
50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000
VARIANT
AMENDMENT NO. 7 Remarks
Vol.
Unit Rate [IDR]
Amount [IDR]
15.000.000 3.000.000
300 60
50.000 50.000
15.000.000 3.000.000
1.000.000 1.000.000 500.000 2.500.000 500.000 600.000 600.000 300.000 1.500.000 300.000
20 20 10 50 10 12 12 6 30 6
50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000
1.000.000 1.000.000 500.000 2.500.000 500.000 600.000 600.000 300.000 1.500.000 300.000
Vol
Unit Rate [IDR]
Amount [IDR]
2
1.1.1 a. 1
2
b. 1
2
c. 1
d. 1
e. 1
2
3
Financial Management Ass. Provincial Sumatera Selatan Financial Management Ass. Provincial Lampung
10 2
district district
180 8
village village
50% 50%
Spot Checking for Nopember 2014 District Coordinator Provincial Bengkulu District Coordinator Provincial Jambi District Coordinator Provincial Babel District Coordinator Provincial Sumatera Selatan District Coordinator Provincial Lampung Financial Management Ass. Provincial Bengkulu Financial Management Ass. Provincial Jambi Financial Management Ass. Provincial Babel Financial Management Ass. Provincial Sumatera Selatan Financial Management Ass. Provincial Lampung
4 4 2 10 2 4 4 2 10 2
district district district district district district district district district district
24 48 24 180 8 24 48 24 180 8
village village village village village village village village village village
50% 50% 50% 50% 50% 50% 50% 50% 50% 50%
10 months 10 months
1 1 1 1 1 1 1 1 1 1
months months months months months months months months months months
3 time 3 time
5 5 5 5 5 3 3 3 3 3
300 60
time time time time time time time time time time
Management Fee 10 % of [1.1]
33.440.000
Spot Checking Provincial Team (PC/QAS) to District to Village (Regular 6 Cycle) Provinsi Bengkulu (4 siklus tersisa disebar ke 2 cluster) 40 desa x 10% = 4 desa from Bengkulu to District Kepahiang and Rejang Lebong Inland Transport Accomodation OSA (fixed)
207.080.000
4 4 4
village village village
1 1 1
years years years
x x x
2 time 2 time 2 time
x x
2 3 day(s)
2 4 6
485.000 300.000 200.000
970.000 1.200.000 1.200.000
2 4 6
485.000 300.000 200.000
970.000 1.200.000 1.200.000
fixed rate ceiling rate fixed rate
from Bengkulu to District Bengkulu Selatan and Kaur Inland Transport Accomodation OSA (Fixed)
4 4 4
village village village
1 1 1
years years years
x x x
2 time 2 time 2 time
x x
2 day(s) 3 day(s)
2 4 6
620.000 300.000 200.000
1.240.000 1.200.000 1.200.000
2 4 6
620.000 300.000 200.000
1.240.000 1.200.000 1.200.000
fixed rate ceiling rate fixed rate
Provinsi Jambi (4 siklus tersisa disebar ke 2 cluster) 33 desa x 10% = 4 desa from Bengkulu to District Merangin and Sorolangun Air Transport Inland Transport Accomodation OSA (Fixed)
4 4 4 4
village village village village
1 1 1 1
years years years years
x x x x
2 2 2 2
time time time time
x x
day(s) 2 day(s) 3 day(s)
2 2 4 6
4.480.000 1.095.000 300.000 200.000
8.960.000 2.190.000 1.200.000 1.200.000
2 2 4 6
4.480.000 1.095.000 300.000 200.000
8.960.000 2.190.000 1.200.000 1.200.000
ceiling rate fixed rate ceiling rate fixed rate
from Bengkulu to District Bungo and Kerinci Air Transport Inland Transport Accomodation OSA (Fixed)
4 4 4 4
village village village village
1 1 1 1
years years years years
x x x x
2 2 2 2
time time time time
x x
2 day(s) 3 day(s)
2 2 4 6
4.480.000 940.000 300.000 200.000
8.960.000 1.880.000 1.200.000 1.200.000
2 2 4 6
4.480.000 940.000 300.000 200.000
8.960.000 1.880.000 1.200.000 1.200.000
ceiling rate fixed rate ceiling rate fixed rate
Province Bangka Belitung (4 siklus tersisa disebar ke 1 cluster) 20 desa x 10% = 2 desa from Pangkal Pinang to District Bangka dan Bangka Tengah Inland Transport OSA (Fixed)
2 2
village village
1 1
years years
x x
4 time 4 time
x
2 day(s)
4 8
700.000 200.000
2.800.000 1.600.000
4 8
700.000 200.000
2.800.000 1.600.000
fixed rate fixed rate
Province Lampung (4 siklus tersisa disebar ke 1 cluster) 20 desa x 10% = 2 desa from Pangkal Pinang to District Tanggamus and Lampung Selatan Air Transport Inland Transport Accomodation OSA (Fixed)
2 2 2 2
village village village village
1 1 1 1
years years years years
x x x x
4 4 4 4
time time time time
x x
2 day(s) 3 day(s)
4 4 8 12
3.480.000 1.520.000 300.000 200.000
13.920.000 6.080.000 2.400.000 2.400.000
4 4 8 12
3.480.000 1.520.000 300.000 200.000
13.920.000 6.080.000 2.400.000 2.400.000
ceiling rate fixed rate ceiling rate fixed rate
Province Sumatera Selatan (4 siklus tersisa disebar ke 4 cluster) 95 desa x 10% = 10 desa from Palembang to District Ogan Ilir, OKI and MUBA Inland Transport Accomodation OSA (Fixed)
10 10 10
village village village
1 1 1
years years years
x x x
1 time 1 time 1 time
x x
5 day(s) 6 day(s)
1 5 6
1.450.000 300.000 200.000
1.450.000 1.500.000 1.200.000
1 5 6
1.450.000 300.000 200.000
1.450.000 1.500.000 1.200.000
fixed rate ceiling rate fixed rate
from Palembang to District OKU , OKUT and OKUS Inland Transport Accomodation OSA (Fixed)
10 10 10
village village village
1 1 1
years years years
x x x
1 time 1 time 1 time
x x
5 day(s) 6 day(s)
1 5 6
1.020.000 300.000 200.000
1.020.000 1.500.000 1.200.000
1 5 6
1.020.000 300.000 200.000
1.020.000 1.500.000 1.200.000
fixed rate ceiling rate fixed rate
from Palembang to District Muara Enim and Lahat Inland Transport Accomodation OSA (Fixed)
10 10 10
village village village
1 1 1
years years years
x x x
1 time 1 time 1 time
x x
5 day(s) 6 day(s)
1 5 6
900.000 300.000 200.000
900.000 1.500.000 1.200.000
1 5 6
900.000 300.000 200.000
900.000 1.500.000 1.200.000
fixed rate ceiling rate fixed rate
16.000.000
-
33.440.000 92.080.000
(115.000.000)
CONTRACT DESCRIPTION
NO.
Vol.
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 6
VARIANT
Vol.
Unit Rate [IDR]
Amount [IDR]
Vol
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 7 Remarks
Vol.
Unit Rate [IDR]
Amount [IDR]
2 4
1.1.2 a. 1
2
b. 1
2
c. 1
d. 1
e. 1
2
3
4
1.1.3 a. 1
2
from Palembang to District Musi Rawas and Empat Lawang Inland Transport Accomodation OSA (Fixed)
years years years
x x x
1 time 1 time 1 time
x x
5 day(s) 6 day(s)
1 5 6
850.000 300.000 200.000
850.000 1.500.000 1.200.000
1 5 6
850.000 300.000 200.000
850.000 1.500.000 1.200.000
fixed rate ceiling rate fixed rate
village village village
years years years
x x x
- time - time - time
x x
2 day(s) 3 day(s)
-
485.000 300.000 200.000
-
-
485.000 300.000 200.000
-
fixed rate ceiling rate fixed rate
4 4 4
village village village
years years years
x x x
- time - time - time
x x
2 day(s) 3 day(s)
-
620.000 300.000 200.000
-
-
620.000 300.000 200.000
-
fixed rate ceiling rate fixed rate
Provinsi Jambi (4 kabupaten x 2 = 8 desa) from Bengkulu to District Merangin and Sorolangun Air Transport Inland Transport Accomodation OSA (Fixed)
4 4 4 4
village village village village
years years years years
x x x x
-
time time time time
x x
2 day(s) 3 day(s)
-
4.480.000 1.095.000 300.000 200.000
-
-
4.480.000 1.095.000 300.000 200.000
-
ceiling rate fixed rate ceiling rate fixed rate
from Bengkulu to District Bungo and Kerinci Air Transport Inland Transport Accomodation OSA (Fixed)
4 4 4 4
village village village village
years years years years
x x x x
-
time time time time
x x
2 day(s) 3 day(s)
-
4.480.000 940.000 300.000 200.000
-
-
4.480.000 940.000 300.000 200.000
-
ceiling rate fixed rate ceiling rate fixed rate
Provinsi Bangka Belitung (2 kabupaten x 2 = 4 desa) from Pangkal Pinang to District Bangka dan Bangka Tengah Inland Transport OSA (Fixed)
4 4 4
village village village
years years years
x x x
- time - time - time
x x
2 day(s) 3 day(s)
-
550.000 200.000
-
-
550.000 200.000
-
fixed rate fixed rate
Provinsi Lampung (2 kabupaten x 2 = 4 desa) from Pangkal Pinang to District Tanggamus and Lampung Selatan Air Transport Inland Transport Accomodation OSA (Fixed)
4 4 4 4
village village village village
years years years years
x x x x
-
time time time time
x x
2 day(s) 3 day(s)
-
3.480.000 1.520.000 300.000 200.000
-
-
3.480.000 1.520.000 300.000 200.000
-
ceiling rate fixed rate ceiling rate fixed rate
Provinsi Sumatera Selatan (10 kabupaten x 2 = 20 desa) from Palembang to District Ogan Ilir, OKI and MUBA Inland Transport Accomodation OSA (Fixed)
6 6 6
village village village
years years years
x x x
1 time 1 time 1 time
x x
3 day(s) 4 day(s)
1 3 4
1.450.000 300.000 200.000
1.450.000 900.000 800.000
1 3 4
1.450.000 300.000 200.000
1.450.000 900.000 800.000
fixed rate ceiling rate fixed rate
from Palembang to District OKU , OKUT and OKUS Inland Transport Accomodation OSA (Fixed)
4 4 4
village village village
years years years
x x x
1 time 1 time 1 time
x x
2 day(s) 3 day(s)
1 2 3
1.020.000 300.000 200.000
1.020.000 600.000 600.000
1 2 3
1.020.000 300.000 200.000
1.020.000 600.000 600.000
fixed rate ceiling rate fixed rate
from Palembang to District Muara Enim and Lahat Inland Transport Accomodation OSA (Fixed)
4 4 4
village village village
years years years
x x x
1 time 1 time 1 time
x x
2 day(s) 3 day(s)
1 2 3
900.000 300.000 200.000
900.000 600.000 600.000
1 2 3
900.000 300.000 200.000
900.000 600.000 600.000
fixed rate ceiling rate fixed rate
from Palembang to District Musi Rawas and Empat Lawang Inland Transport Accomodation OSA (Fixed)
2 2 2
village village village
years years years
x x x
1 time 1 time 1 time
x x
1 day(s) 2 day(s)
1 1 2
850.000 300.000 200.000
850.000 300.000 400.000
1 1 2
850.000 300.000 200.000
850.000 300.000 400.000
fixed rate ceiling rate fixed rate
10 10 10
village village village
Spot Checking Provincial Team (PC/QAS) to District to Village (Sustainability 1 cycle) Provinsi Bengkulu (4 kabupaten x 2 = 8 desa) from Bengkulu to District Kepahiang and Rejang Lebong Inland Transport Accomodation OSA (Fixed)
4 4 4
from Bengkulu to District Bengkulu Selatan and Kaur Inland Transport Accomodation OSA (Fixed)
Spot Checking Provincial Team - Financial Management Specialist (FMS) to District/ Village (regular Provinsi Bengkulu (4 siklus tersisa disebar ke 2 cluster) 40 desa x 10% = 4 desa from Bengkulu to District Kepahiang and Rejang Lebong Inland Transport Accomodation OSA (fixed) from Bengkulu to District Bengkulu Selatan and Kaur Inland Transport Accomodation OSA (Fixed)
1 1 1
6 cycle)
4 4 4
village village village
1 1 1
years years years
x x x
2 time 2 time 2 time
x
2 day(s) 3 day(s)
2 4 6
485.000 300.000 200.000
970.000 1.200.000 1.200.000
2 4 6
485.000 300.000 200.000
970.000 1.200.000 1.200.000
fixed rate ceiling rate fixed rate
4 4 4
village village village
1 1 1
years years years
x x x
2 time 2 time 2 time
x x
2 day(s) 3 day(s)
2 4 6
620.000 300.000 200.000
1.240.000 1.200.000 1.200.000
2 4 6
620.000 300.000 200.000
1.240.000 1.200.000 1.200.000
fixed rate ceiling rate fixed rate
CONTRACT DESCRIPTION
NO.
Vol.
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 6
VARIANT
Vol.
Unit Rate [IDR]
Amount [IDR]
4.480.000 1.095.000 300.000 200.000
AMENDMENT NO. 7 Remarks
Vol.
Unit Rate [IDR]
Amount [IDR]
8.960.000 2.190.000 1.200.000 1.200.000
2 2 4 6
4.480.000 1.095.000 300.000 200.000
8.960.000 2.190.000 1.200.000 1.200.000
ceiling rate fixed rate ceiling rate fixed rate
Vol
Unit Rate [IDR]
Amount [IDR]
2 b. 1
2
c. 1
d. 1
e. 1
2
3
4
1.1.4 a. 1
2
b. 1
2
c. 1
Provinsi Jambi (4 siklus tersisa disebar ke 2 cluster) 33 desa x 10% = 4 desa from Bengkulu to District Merangin and Sorolangun Air Transport Inland Transport Accomodation OSA (Fixed)
4 4 4 4
village village village village
1 1 1 1
years years years years
x x x x
2 2 2 2
time time time time
x x
2 day(s) 3 day(s)
2 2 4 6
from Bengkulu to District Bungo and Kerinci Air Transport Inland Transport Accomodation OSA (Fixed)
4 4 4 4
village village village village
1 1 1 1
years years years years
x x x x
2 2 2 2
time time time time
x x
2 day(s) 3 day(s)
2 2 4 6
4.480.000 940.000 300.000 200.000
8.960.000 1.880.000 1.200.000 1.200.000
2 2 4 6
4.480.000 940.000 300.000 200.000
8.960.000 1.880.000 1.200.000 1.200.000
ceiling rate fixed rate ceiling rate fixed rate
Province Bangka Belitung (4 siklus tersisa disebar ke 1 cluster) 20 desa x 10% = 2 desa from Pangkal Pinang to District Bangka dan Bangka Tengah Inland Transport OSA (Fixed)
2 2
village village
1 1
years years
x x
4 time 4 time
x
2 day(s)
4 8
700.000 200.000
2.800.000 1.600.000
4 8
700.000 200.000
2.800.000 1.600.000
fixed rate fixed rate
Province Lampung (4 siklus tersisa disebar ke 1 cluster) 20 desa x 10% = 2 desa from Pangkal Pinang to District Tanggamus and Lampung Selatan Air Transport Inland Transport Accomodation OSA (Fixed)
2 2 2 2
village village village village
1 1 1 1
years years years years
x x x x
4 4 4 4
x x
2 day(s) 3 day(s)
4 4 8 12
3.480.000 1.520.000 300.000 200.000
13.920.000 6.080.000 2.400.000 2.400.000
4 4 8 12
3.480.000 1.520.000 300.000 200.000
13.920.000 6.080.000 2.400.000 2.400.000
ceiling rate fixed rate ceiling rate fixed rate
Province Sumatera Selatan (4 siklus tersisa disebar ke 4 cluster) 95 desa x 10% = 10 desa from Palembang to District Ogan Ilir, OKI and MUBA Inland Transport Accomodation OSA (Fixed)
10 10 10
village village village
1 1 1
years years years
x x x
1 time 1 time 1 time
x
5 day(s) 6 day(s)
1 5 6
1.450.000 300.000 200.000
1.450.000 1.500.000 1.200.000
1 5 6
1.450.000 300.000 200.000
1.450.000 1.500.000 1.200.000
fixed rate ceiling rate fixed rate
from Palembang to District OKU , OKUT and OKUS Inland Transport Accomodation OSA (Fixed)
10 10 10
village village village
1 1 1
years years years
x x x
1 time 1 time 1 time
x x
5 day(s) 6 day(s)
1 5 6
1.020.000 300.000 200.000
1.020.000 1.500.000 1.200.000
1 5 6
1.020.000 300.000 200.000
1.020.000 1.500.000 1.200.000
fixed rate ceiling rate fixed rate
from Palembang to District Muara Enim and Lahat Inland Transport Accomodation OSA (Fixed)
10 10 10
village village village
1 1 1
years years years
x x x
1 time 1 time 1 time
x x
5 day(s) 6 day(s)
1 5 6
900.000 300.000 200.000
900.000 1.500.000 1.200.000
1 5 6
900.000 300.000 200.000
900.000 1.500.000 1.200.000
fixed rate ceiling rate fixed rate
from Palembang to District Musi Rawas and Empat Lawang Inland Transport Accomodation OSA (Fixed)
10 10 10
village village village
1 1 1
years years years
x x x
1 time 1 time 1 time
x x
5 day(s) 6 day(s)
1 5 6
850.000 300.000 200.000
850.000 1.500.000 1.200.000
1 5 6
850.000 300.000 200.000
850.000 1.500.000 1.200.000
fixed rate ceiling rate fixed rate
Spot Checking Provincial Team - Financial Management Specialist (FMS) to District / Village (Sustainability 1 Cycle) Provinsi Bengkulu (4 kabupaten x 2 = 8 desa) from Bengkulu to District Kepahiang and Rejang Lebong Inland Transport 4 village Accomodation 4 village OSA (Fixed) 4 village
years years years
x x x
- time - time - time
x x
2 day(s) 3 day(s)
-
485.000 300.000 200.000
-
-
485.000 300.000 200.000
-
fixed rate ceiling rate fixed rate
from Bengkulu to District Bengkulu Selatan and Kaur Inland Transport Accomodation OSA (Fixed)
4 4 4
village village village
years years years
x x x
- time - time - time
x x
2 day(s) 3 day(s)
-
620.000 300.000 200.000
-
-
620.000 300.000 200.000
-
fixed rate ceiling rate fixed rate
Provinsi Jambi (4 kabupaten x 2 = 8 desa) from Bengkulu to District Merangin and Sorolangun Air Transport Inland Transport Accomodation OSA (Fixed)
4 4 4 4
village village village village
years years years years
x x x x
-
time time time time
x x
2 day(s) 3 day(s)
-
4.480.000 1.095.000 300.000 200.000
-
-
4.480.000 1.095.000 300.000 200.000
-
ceiling rate fixed rate ceiling rate fixed rate
from Bengkulu to District Bungo and Kerinci Air Transport Inland Transport Accomodation OSA (Fixed)
4 4 4 4
village village village village
years years years years
x x x x
-
time time time time
x x
2 day(s) 3 day(s)
-
4.480.000 940.000 300.000 200.000
-
-
4.480.000 940.000 300.000 200.000
-
fixed rate ceiling rate fixed rate
Provinsi Bangka Belitung (2 kabupaten x 2 = 4 desa) from Pangkal Pinang to District Bangka dan Bangka Tengah
4
village
years
x
- time
time time time time
CONTRACT DESCRIPTION
NO.
Vol.
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 6
VARIANT
Vol.
Unit Rate [IDR]
Amount [IDR]
Vol
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 7 Remarks
Vol.
Unit Rate [IDR]
Amount [IDR]
2
d. 1
e. 1
2
3
4
1.1.5 a. 1
2
3
4
b. 1
Inland Transport OSA (Fixed)
4 4
village village
years years
x x
- time - time
x x
2 day(s) 3 day(s)
-
550.000 200.000
-
-
550.000 200.000
-
fixed rate fixed rate
Provinsi Lampung (2 kabupaten x 2 = 4 desa) from Pangkal Pinang to District Tanggamus and Lampung Selatan Air Transport Inland Transport Accomodation OSA (Fixed)
4 4 4 4
village village village village
years years years years
x x x x
-
time time time time
x x
day(s) 2 day(s) 3 day(s)
-
3.480.000 1.520.000 300.000 200.000
-
-
3.480.000 1.520.000 300.000 200.000
-
ceiling rate fixed rate ceiling rate fixed rate
Provinsi Sumatera Selatan (10 kabupaten x 2 = 20 desa) from Palembang to District Ogan Ilir, OKI and MUBA Inland Transport Accomodation OSA (Fixed)
6 6 6
village village village
years years years
x x x
1 time 1 time 1 time
x x
3 day(s) 4 day(s)
1 3 4
1.450.000 300.000 200.000
1.450.000 900.000 800.000
1 3 4
1.450.000 300.000 200.000
1.450.000 900.000 800.000
fixed rate ceiling rate fixed rate
from Palembang to District OKU , OKUT and OKUS Inland Transport Accomodation OSA (Fixed)
4 4 4
village village village
years years years
x x x
1 time 1 time 1 time
x x
2 day(s) 3 day(s)
1 2 3
1.020.000 300.000 200.000
1.020.000 600.000 600.000
1 2 3
1.020.000 300.000 200.000
1.020.000 600.000 600.000
fixed rate ceiling rate fixed rate
from Palembang to District Muara Enim and Lahat Inland Transport Accomodation OSA (Fixed)
4 4 4
village village village
years years years
x x x
1 time 1 time 1 time
x x
2 day(s) 3 day(s)
1 2 3
900.000 300.000 200.000
900.000 600.000 600.000
1 2 3
900.000 300.000 200.000
900.000 600.000 600.000
fixed rate ceiling rate fixed rate
from Palembang to District Musi Rawas and Empat Lawang Inland Transport Accomodation OSA (Fixed)
2 2 2
village village village
years years years
x x x
1 time 1 time 1 time
x x
1 day(s) 2 day(s)
1 1 2
850.000 300.000 200.000
850.000 300.000 400.000
1 1 2
850.000 300.000 200.000
850.000 300.000 400.000
fixed rate ceiling rate fixed rate
person person
5 5
village village
1 1
years years
x x
3 time 3 time
x
3 day(s)
6 18
200.000 50.000
1.200.000 900.000
6 18
200.000 50.000
1.200.000 900.000
fixed rate fixed rate
person person
1 1
village village
5 5
years years
x x
- time - time
x
1 day(s)
-
200.000 50.000
-
-
200.000 50.000
-
fixed rate fixed rate
2 2
person person
5 5
village village
1 1
years years
x x
3 time 3 time
x
3 day(s)
6 18
100.000 50.000
600.000 900.000
6 18
100.000 50.000
600.000 900.000
fixed rate fixed rate
1 1
person person
1 1
village village
5 5
years years
x x
- time - time
x
1 day(s)
-
100.000 50.000
-
-
100.000 50.000
-
fixed rate fixed rate
2 2
person person
5 5
village village
1 1
years years
x x
3 time 3 time
x
3 day(s)
6 18
100.000 50.000
600.000 900.000
6 18
100.000 50.000
600.000 900.000
fixed rate fixed rate
1 1
person person
1 1
village village
5 5
years years
x x
- time - time
x
1 day(s)
-
100.000 50.000
-
-
100.000 50.000
-
fixed rate fixed rate
2 2
person person
5 5
village village
1 1
years years
x x
3 time 3 time
x
3 day(s)
6 18
100.000 50.000
600.000 900.000
6 18
100.000 50.000
600.000 900.000
fixed rate fixed rate
1 1
person person
1 1
village village
5 5
years years
x x
- time - time
x
1 day(s)
-
100.000 50.000
-
-
100.000 50.000
-
fixed rate fixed rate
2 2
person person
5 5
village village
1 1
years years
x x
3 time 3 time
x
3 day(s)
6 18
100.000 50.000
600.000 900.000
6 18
100.000 50.000
600.000 900.000
fixed rate fixed rate
1 1
person person
1 1
village village
5 5
years years
x x
- time - time
x
1 day(s)
-
100.000 50.000
-
-
100.000 50.000
-
fixed rate fixed rate
Spot Checking District Team (DC and DFMA) to 50% Village (6 cycle) Bengkulu Province (3 siklus tersisa) Kepahiang (10 village) Spot Checking for Regular (6 Phase) Inland Transport (remote) 2 OSA 2 Spot Checking for Sustainability (1 Phase) Inland Transport 1 OSA 1 Rejang Lebong (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Kaur (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Bengkulu Selatan (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Jambi Province Merangin (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA
CONTRACT DESCRIPTION
NO.
Vol.
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 6
VARIANT
Vol.
Unit Rate [IDR]
Amount [IDR]
Vol
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 7 Remarks
Vol.
Unit Rate [IDR]
Amount [IDR]
2 2
3
4
c. 1
2
d. 1
2
3
4
Sorolangun (5 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Bungo (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Kerinci (8 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Bangka Belitung Province Bangka (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Bangka Tengah (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Sumatera Selatan Province Ogan Ilir (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Ogan Komering Ilir (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA OKU Timur (8 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA OKU Selatan (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA
2 2
person person
3 3
village village
1 1
years years
x x
3 time 3 time
x
2 day(s)
6 12
100.000 50.000
600.000 600.000
6 12
100.000 50.000
600.000 600.000
fixed rate fixed rate
1 1
person person
1 1
village village
5 5
years years
x x
- time - time
x
1 day(s)
-
100.000 50.000
-
-
100.000 50.000
-
fixed rate fixed rate
2 2
person person
5 5
village village
1 1
years years
x x
3 time 3 time
x
3 day(s)
6 18
100.000 50.000
600.000 900.000
6 18
100.000 50.000
600.000 900.000
fixed rate fixed rate
1 1
person person
1 1
village village
5 5
years years
x x
- time - time
x
1 day(s)
-
100.000 50.000
-
-
100.000 50.000
-
fixed rate fixed rate
2 2
person person
4 4
village village
1 1
years years
x x
3 time 3 time
x
2 day(s)
6 12
100.000 50.000
600.000 600.000
6 12
100.000 50.000
600.000 600.000
fixed rate fixed rate
1 1
person person
1 1
village village
5 5
years years
x x
- time - time
x
1 day(s)
-
100.000 50.000
-
-
100.000 50.000
-
fixed rate fixed rate
2 2
person person
5 5
village village
1 1
years years
x x
3 time 3 time
x
3 day(s)
6 18
100.000 50.000
600.000 900.000
6 18
100.000 50.000
600.000 900.000
fixed rate fixed rate
1 1
person person
1 1
village village
5 5
years years
x x
- time - time
x
1 day(s)
-
100.000 50.000
-
-
100.000 50.000
-
fixed rate fixed rate
2 2
person person
5 5
village village
1 1
years years
x x
3 time 3 time
x
3 day(s)
6 18
100.000 50.000
600.000 900.000
6 18
100.000 50.000
600.000 900.000
fixed rate fixed rate
1 1
person person
1 1
village village
5 5
years years
x x
- time - time
x
1 day(s)
-
100.000 50.000
-
-
100.000 50.000
-
fixed rate fixed rate
2 2
person person
5 5
village village
1 1
years years
x x
3 time 3 time
x
3 day(s)
6 18
100.000 50.000
600.000 900.000
6 18
100.000 50.000
600.000 900.000
fixed rate fixed rate
1 1
person person
1 1
village village
5 5
years years
x x
1 time 1 time
x
1 day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
fixed rate fixed rate
2 2
person person
5 5
village village
1 1
years years
x x
3 time 3 time
x
3 day(s)
6 18
100.000 50.000
600.000 900.000
6 18
100.000 50.000
600.000 900.000
fixed rate fixed rate
1 1
person person
1 1
village village
5 5
years years
x x
1 time 1 time
x
1 day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
fixed rate fixed rate
2 2
person person
4 4
village village
1 1
years years
x x
3 time 3 time
x
2 day(s)
3 6
100.000 50.000
300.000 300.000
3 6
100.000 50.000
300.000 300.000
fixed rate fixed rate
1 1
person person
1 1
village village
5 5
years years
x x
1 time 1 time
x
1 day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
fixed rate fixed rate
2 2
person person
5 5
village village
1 1
years years
x x
3 time 3 time
x
3 day(s)
6 18
100.000 50.000
600.000 900.000
6 18
100.000 50.000
600.000 900.000
fixed rate fixed rate
1 1
person person
1 1
village village
5 5
years years
x x
1 time 1 time
x
1 day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
fixed rate fixed rate
CONTRACT DESCRIPTION
NO.
Vol.
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 6
VARIANT
Vol.
Unit Rate [IDR]
Amount [IDR]
Vol
Unit Rate [IDR]
AMENDMENT NO. 7
Amount [IDR]
Remarks
Vol.
Unit Rate [IDR]
Amount [IDR]
2 5
6
7
8
9
10
e. 1
2
Muara Enim (9 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Lahat (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Musi Rawas (8 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Musi Banyuasin (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Empat Lawang (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Ogan Komering Ulu (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Lampung Province Lampung Selatan (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Tanggamus (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Management Fee 10 % of [1.1]
2 2
person person
5 5
village village
1 1
years years
x x
3 time 3 time
x
3 day(s)
6 18
100.000 50.000
600.000 900.000
6 18
100.000 50.000
600.000 900.000
fixed rate fixed rate
1 1
person person
1 1
village village
5 5
years years
x x
1 time 1 time
x
1 day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
fixed rate fixed rate
2 2
person person
5 5
village village
1 1
years years
x x
3 time 3 time
x
3 day(s)
6 18
100.000 50.000
600.000 900.000
6 18
100.000 50.000
600.000 900.000
fixed rate fixed rate
1 1
person person
1 1
village village
5 5
years years
x x
1 time 1 time
x
1 day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
fixed rate fixed rate
2 2
person person
4 4
village village
1 1
years years
x x
3 time 3 time
x
2 day(s)
6 12
100.000 50.000
600.000 600.000
6 12
100.000 50.000
600.000 600.000
fixed rate fixed rate
1 1
person person
1 1
village village
5 5
years years
x x
1 time 1 time
x
1 day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
fixed rate fixed rate
2 2
person person
5 5
village village
1 1
years years
x x
3 time 3 time
x
3 day(s)
6 18
100.000 50.000
600.000 900.000
6 18
100.000 50.000
600.000 900.000
fixed rate fixed rate
1 1
person person
1 1
village village
5 5
years years
x x
1 time 1 time
x
1 day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
fixed rate fixed rate
2 2
person person
5 5
village village
1 1
years years
x x
3 time 3 time
x
3 day(s)
6 18
100.000 50.000
600.000 900.000
6 18
100.000 50.000
600.000 900.000
fixed rate fixed rate
1 1
person person
1 1
village village
5 5
years years
x x
- time - time
x
1 day(s)
-
100.000 50.000
-
-
100.000 50.000
-
fixed rate fixed rate
2 2
person person
5 5
village village
1 1
years years
x x
3 time 3 time
x
3 day(s)
6 18
100.000 50.000
600.000 900.000
6 18
100.000 50.000
600.000 900.000
fixed rate fixed rate
1 1
person person
1 1
village village
5 5
years years
x x
- time - time
x
1 day(s)
-
100.000 50.000
-
-
100.000 50.000
-
fixed rate fixed rate
2 2
person person
5 5
village village
1 1
years years
x x
3 time 3 time
x
3 day(s)
6 18
100.000 50.000
600.000 900.000
6 18
100.000 50.000
600.000 900.000
fixed rate fixed rate
1 1
person person
1 1
village village
5 5
years years
x x
- time - time
x
1 day(s)
-
100.000 50.000
-
-
100.000 50.000
-
fixed rate fixed rate
2 2
person person
5 5
village village
1 1
years years
x x
3 time 3 time
x
3 day(s)
6 18
100.000 50.000
600.000 900.000
6 18
100.000 50.000
600.000 900.000
fixed rate fixed rate
1 1
person person
1 1
village village
5 5
years years
x x
- time - time
x
1 day(s)
-
100.000 50.000
-
-
100.000 50.000
-
fixed rate fixed rate
20.708.000
(11.500.000)
9.208.000
CONTRACT DESCRIPTION
NO.
Vol.
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 6 Vol.
Unit Rate [IDR]
Amount [IDR]
VARIANT Vol
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 7 Vol.
Unit Rate [IDR]
Remarks Amount [IDR]
2 1.2 1.2.1 a 1
2
3
4
5
b 1
2
3
4
5
c 1
2
Monitoring Evaluation Regional Team to Province and District (targeted 2014) From Regional to Province/District/Vilage Project Manager (PM) to Province Bengkulu : Transport to Bengkulu 1 person Inland Transport 1 person Acocomodation 1 person OSA 1 person
176.050.000
(100.000.000)
76.050.000
x x x x
1 1 1 1
years years years years
x x x x
1 1 1 1
time time time time
x x
4 5
days days
1 1 4 5
1 1 4 5
2.500.000 620.000 300.000 200.000
2.500.000 620.000 1.200.000 1.000.000
1 1 4 5
2.500.000 620.000 300.000 200.000
2.500.000 620.000 1.200.000 1.000.000
ceiling rate fixed rate ceiling rate fixed rate
to Provinsi Jambi : Transport to Jambi Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
1 1 1 1
time time time time
x x
4 5
days days
1 1 4 5
1 1 4 5
1.500.000 1.095.000 300.000 200.000
1.500.000 1.095.000 1.200.000 1.000.000
1 1 4 5
1.500.000 1.095.000 300.000 200.000
1.500.000 1.095.000 1.200.000 1.000.000
ceiling rate fixed rate ceiling rate fixed rate
to Province Babel : Transport to Pangkal Pinang Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
1 1 1 1
time time time time
x x
4 5
days days
1 1 4 5
1 1 4 5
1.500.000 700.000 300.000 200.000
1.500.000 700.000 1.200.000 1.000.000
1 1 4 5
1.500.000 700.000 300.000 200.000
1.500.000 700.000 1.200.000 1.000.000
ceiling rate fixed rate ceiling rate fixed rate
to Province Lampung Transport to Lampung Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
1 1 1 1
time time time time
x x
4 5
days days
1 1 4 5
1 1 4 5
1.500.000 1.520.000 300.000 200.000
1.500.000 1.520.000 1.200.000 1.000.000
1 1 4 5
1.500.000 1.520.000 300.000 200.000
1.500.000 1.520.000 1.200.000 1.000.000
ceiling rate fixed rate ceiling rate fixed rate
to Province Sumatera Selatan Inland Transport Acocomodation OSA
1 1 1
person person person
x x x
1 1 1
years years years
x x x
1 1 1
time time time
x x
4 5
days days
1 4 5
1 4 5
1.020.000 300.000 200.000
1.020.000 1.200.000 1.000.000
1 4 5
1.020.000 300.000 200.000
1.020.000 1.200.000 1.000.000
fixed rate ceiling rate fixed rate
Legal Government Specialist ( LGS ) to Province Bengkulu : Transport to Bengkulu Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
1 1 1 1
time time time time
x x
2 3
days days
1 1 2 3
1 1 2 3
2.500.000 620.000 300.000 200.000
2.500.000 620.000 600.000 600.000
1 1 2 3
2.500.000 620.000 300.000 200.000
2.500.000 620.000 600.000 600.000
ceiling rate fixed rate ceiling rate fixed rate
to Provinsi Jambi : Transport to Jambi Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
1 1 1 1
time time time time
x x
2 3
days days
1 1 2 3
1 1 2 3
1.500.000 1.095.000 300.000 200.000
1.500.000 1.095.000 600.000 600.000
1 1 2 3
1.500.000 1.095.000 300.000 200.000
1.500.000 1.095.000 600.000 600.000
ceiling rate fixed rate ceiling rate fixed rate
to Province Babel : Transport to Pangkal Pinang Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
1 1 1 1
time time time time
x x
2 3
days days
1 1 2 3
1 1 2 3
1.500.000 700.000 300.000 200.000
1.500.000 700.000 600.000 600.000
1 1 2 3
1.500.000 700.000 300.000 200.000
1.500.000 700.000 600.000 600.000
ceiling rate fixed rate ceiling rate fixed rate
to Province Lampung Transport to Lampung Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
1 1 1 1
time time time time
x x
2 3
days days
1 1 2 3
1 1 2 3
1.500.000 1.520.000 300.000 200.000
1.500.000 1.520.000 600.000 600.000
1 1 2 3
1.500.000 1.520.000 300.000 200.000
1.500.000 1.520.000 600.000 600.000
ceiling rate fixed rate ceiling rate fixed rate
to Province Sumatera Selatan Inland Transport Acocomodation OSA
1 1 1
person person person
x x x
1 1 1
years years years
x x x
1 1 1
time time time
x x
2 3
days days
1 2 3
1 2 3
1.020.000 300.000 200.000
1.020.000 600.000 600.000
1 2 3
1.020.000 300.000 200.000
1.020.000 600.000 600.000
fixed rate ceiling rate fixed rate
Training Coordinator ( TC ) to Province Bengkulu : Transport to Bengkulu Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
1 1 1 1
time time time time
x x
2 3
days days
1 1 2 3
1 1 2 3
2.500.000 620.000 300.000 200.000
2.500.000 620.000 600.000 600.000
1 1 2 3
2.500.000 620.000 300.000 200.000
2.500.000 620.000 600.000 600.000
ceiling rate fixed rate ceiling rate fixed rate
to Provinsi Jambi : Transport to Jambi Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
1 1 1 1
time time time time
x x
2 3
days days
1 1 2 3
1 1 2 3
1.500.000 1.095.000 300.000 200.000
1.500.000 1.095.000 600.000 600.000
1 1 2 3
1.500.000 1.095.000 300.000 200.000
1.500.000 1.095.000 600.000 600.000
ceiling rate fixed rate ceiling rate fixed rate
CONTRACT DESCRIPTION
NO.
Vol.
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 6 Vol.
Unit Rate [IDR]
Amount [IDR]
VARIANT Vol
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 7 Remarks
Vol.
Unit Rate [IDR]
Amount [IDR]
2 3
4
5
6
d 1
2
3
4
5
5
to Province Babel : Transport to Pangkal Pinang Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
1 1 1 1
time time time time
to Province Lampung Transport to Lampung Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
1 1 1 1
time time time time
x x
to Province Sumatera Selatan Inland Transport Acocomodation OSA
1 1 1
person person person
x x x
1 1 1
years years years
x x x
1 1 1
time time time
22 kabupaten x 20% = 4 time Transport to province (average) Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
2 2 2 2
Data Management Specialist ( DMS ) to Province Bengkulu : Transport to Bengkulu Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
to Provinsi Jambi : Transport to Jambi Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
to Province Babel : Transport to Pangkal Pinang Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
to Province Lampung Transport to Lampung Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
to Province Sumatera Selatan Inland Transport Acocomodation OSA
1 1 1
person person person
22 kabupaten x 20% = 4 time Inland Transport Acocomodation OSA
1 1 1
person person person
1.2.2 Monitoring Evaluation Provincial Team (PC/QAS) to District and Village (targeted village 2014) 1 Province Bengkulu & Jambi Bengkulu to District and Village Inland Transport 1 person Acocomodation 1 person OSA 1 person 2
3
Bengkulu To Jambi and District and Village Transport to Jambi Inland Transport Acocomodation OSA Province Babel & Lampung Pangkal Pinang to District and Village
1 1 1 1
person person person person
days days
1 1 2 3
1 1 2 3
1.500.000 700.000 300.000 200.000
1.500.000 700.000 600.000 600.000
1 1 2 3
1.500.000 700.000 300.000 200.000
1.500.000 700.000 600.000 600.000
ceiling rate fixed rate ceiling rate fixed rate
2 3
days days
1 1 2 3
1 1 2 3
1.500.000 1.520.000 300.000 200.000
1.500.000 1.520.000 600.000 600.000
1 1 2 3
1.500.000 1.520.000 300.000 200.000
1.500.000 1.520.000 600.000 600.000
ceiling rate fixed rate ceiling rate fixed rate
x x
2 3
days days
1 2 3
1 2 3
1.020.000 300.000 200.000
1.020.000 600.000 600.000
1 2 3
1.020.000 300.000 200.000
1.020.000 600.000 600.000
fixed rate ceiling rate fixed rate
time time time time
x x
2 3
days days
2 2 4 6
2 2 4 6
1.500.000 1.520.000 300.000 200.000
3.000.000 3.040.000 1.200.000 1.200.000
2 2 4 6
1.500.000 1.520.000 300.000 200.000
3.000.000 3.040.000 1.200.000 1.200.000
ceiling rate fixed rate ceiling rate fixed rate
1 1 1 1
time time time time
x x
2 3
days days
1 1 2 3
1 1 2 3
2.500.000 620.000 300.000 200.000
2.500.000 620.000 600.000 600.000
1 1 2 3
2.500.000 620.000 300.000 200.000
2.500.000 620.000 600.000 600.000
ceiling rate fixed rate ceiling rate fixed rate
x x x x
1 1 1 1
time time time time
x x
2 3
days days
1 1 2 3
1 1 2 3
1.500.000 1.095.000 300.000 200.000
1.500.000 1.095.000 600.000 600.000
1 1 2 3
1.500.000 1.095.000 300.000 200.000
1.500.000 1.095.000 600.000 600.000
ceiling rate fixed rate ceiling rate fixed rate
years years years years
x x x x
1 1 1 1
time time time time
x x
2 3
days days
1 1 2 3
1 1 2 3
1.500.000 700.000 300.000 200.000
1.500.000 700.000 600.000 600.000
1 1 2 3
1.500.000 700.000 300.000 200.000
1.500.000 700.000 600.000 600.000
ceiling rate fixed rate ceiling rate fixed rate
1 1 1 1
years years years years
x x x x
1 1 1 1
time time time time
x x
2 3
days days
1 1 2 3
1 1 2 3
1.500.000 1.520.000 300.000 200.000
1.500.000 1.520.000 600.000 600.000
1 1 2 3
1.500.000 1.520.000 300.000 200.000
1.500.000 1.520.000 600.000 600.000
ceiling rate fixed rate ceiling rate fixed rate
x x x
1 1 1
years years years
x x x
1 1 1
time time time
x x
2 3
days days
1 2 3
1 2 3
1.020.000 300.000 200.000
1.020.000 600.000 600.000
1 2 3
1.020.000 300.000 200.000
1.020.000 600.000 600.000
fixed rate ceiling rate fixed rate
x x x
1 1 1
years years years
x x x
2 2 2
time time time
x x
2 3
days days
2 4 6
2 4 6
1.520.000 300.000 200.000
3.040.000 1.200.000 1.200.000
2 4 6
1.520.000 300.000 200.000
3.040.000 1.200.000 1.200.000
fixed rate ceiling rate fixed rate
x x x x
1 1 1 1
years years years years
x x x x
2 2 2 2
time time time time
x x
4 5
days days
2 8 10
2 8 10
620.000 300.000 200.000
1.240.000 2.400.000 2.000.000
2 8 10
620.000 300.000 200.000
1.240.000 2.400.000 2.000.000
fixed rate ceiling rate fixed rate
x x x x x
1 1 1 1 1
years years years years years
x x x x x
2 2 2 2 2
time time time time time
x x
4 5
days days
2 2 8 10
2 2 8 10
4.480.000 1.095.000 300.000 200.000
8.960.000 2.190.000 2.400.000 2.000.000
2 2 8 10
4.480.000 1.095.000 300.000 200.000
8.960.000 2.190.000 2.400.000 2.000.000
ceiling rate fixed rate ceiling rate fixed rate
x
1
years
x
2
time
x x
2 3
CONTRACT DESCRIPTION
NO.
Vol.
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 6 Vol.
Unit Rate [IDR]
Amount [IDR]
VARIANT Vol
Unit Rate [IDR]
AMENDMENT NO. 7
Amount [IDR]
Remarks
Vol.
Unit Rate [IDR]
Amount [IDR]
2
4
5
Inland Transport Acocomodation OSA
1 1 1
person person person
x x x
1 1 1
years years years
x x x
2 2 2
time time time
x x
4 5
days days
2 8 10
2 8 10
700.000 300.000 200.000
1.400.000 2.400.000 2.000.000
2 8 10
700.000 300.000 200.000
1.400.000 2.400.000 2.000.000
fixed rate ceiling rate fixed rate
Pangkal Pinang to Lampung and District and Village Air Transport Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x x
1 1 1 1 1
years years years years years
x x x x x
2 2 2 2 2
time time time time time
x x
4 5
days days
2 2 8 10
2 2 8 10
3.480.000 1.520.000 300.000 200.000
6.960.000 3.040.000 2.400.000 2.000.000
2 2 8 10
3.480.000 1.520.000 300.000 200.000
6.960.000 3.040.000 2.400.000 2.000.000
ceiling rate fixed rate ceiling rate fixed rate
Province Sumatera selatan Palembang to District and Village Inland Transport Acocomodation OSA
1 1 1
person person person
x x x x
1 1 1 1
years years years years
x x x x
2 2 2 2
time time time time
x x
4 5
days days
2 8 10
2 8 10
1.020.000 300.000 200.000
2.040.000 2.400.000 2.000.000
2 8 10
1.020.000 300.000 200.000
2.040.000 2.400.000 2.000.000
fixed rate ceiling rate fixed rate
x x x x
0,5 0,5 0,5 0,5
years years years years
x x x x
1 1 1 1
time time time time
x x
1 2
days days
1 1 1 2
2 2 2 4
4.480.000 250.000 300.000 200.000
8.960.000 500.000 600.000 800.000
2 2 2 4
4.480.000 250.000 300.000 200.000
8.960.000 500.000 600.000 800.000
ceiling rate fixed rate ceiling rate fixed rate
x x x x
0,5 0,5 0,5 0,5
years years years years
x x x x
1 1 1 1
time time time time
x x
1 2
days days
1 1 1 2
2 2 2 4
3.480.000 250.000 300.000 200.000
6.960.000 500.000 600.000 800.000
2 2 2 4
3.480.000 250.000 300.000 200.000
6.960.000 500.000 600.000 800.000
ceiling rate fixed rate ceiling rate fixed rate
1.2.3 Monitoring Evaluation Provincial Team (PC/QAS and FMS) to Other Province (2014) 1 Provincial Team Bengkulu & Jambi to Provinsi Jambi : Transport to Jambi 2 person Inland Transport 2 person Acocomodation 2 person OSA 2 person 2
Provincial Team Babel & Lampung to Province Lampung Transport to Lampung Inland Transport Acocomodation OSA
2 2 2 2
person person person person
1.2.4 Monitoring Evaluation District Team (DC) to Village (targeted village 2014) 1 District Coordinator Provincial Bengkulu Bengkulu 4 district Inland Transport 4 person Acocomodation 4 person OSA 4 person 2
3
4
5
District Coordinator Provincial Jambi Inland Transport Acocomodation OSA
Jambi
District Coordinator Provincial Babel Inland Transport Acocomodation OSA
Babel
District Coordinator Provincial Sumsel Inland Transport Acocomodation OSA
Sumsel
District Coordinator Provincial Lampung Inland Transport Acocomodation OSA
Lampung
32 32 32 32
village village village village
x x x x
50% 50% 50% 50%
x x x x
0,5 0,5 0,5 0,5
years years years years
x x x x
1 1 1 1
time time time time
x x
1 2
days days
4 4 8
4 4 8
250.000 300.000 50.000
1.000.000 1.200.000 400.000
4 4 8
250.000 300.000 50.000
1.000.000 1.200.000 400.000
fixed rate ceiling rate fixed rate
4 4 4 4
district person person person
26 26 26 26
village village village village
x x x x
50% 50% 50% 50%
x x x x
0,5 0,5 0,5 0,5
years years years years
x x x x
1 1 1 1
time time time time
x x
1 2
days days
4 4 8
4 4 8
250.000 300.000 50.000
1.000.000 1.200.000 400.000
4 4 8
250.000 300.000 50.000
1.000.000 1.200.000 400.000
fixed rate ceiling rate fixed rate
2 2 2 2
district person person person
16 16 16 16
village village village village
x x x x
50% 50% 50% 50%
x x x x
0,5 0,5 0,5 0,5
years years years years
x x x x
1 1 1 1
time time time time
x x
1 2
days days
2 2 4
2 2 4
250.000 300.000 50.000
500.000 600.000 200.000
2 2 4
250.000 300.000 50.000
500.000 600.000 200.000
fixed rate ceiling rate fixed rate
10 10 10 10
district person person person
75 75 75 75
village village village village
x x x x
50% 50% 50% 50%
x x x x
0,5 0,5 0,5 0,5
years years years years
x x x x
1 1 1 1
time time time time
x x
2 3
days days
10 20 30
10 20 30
250.000 300.000 50.000
2.500.000 6.000.000 1.500.000
10 20 30
250.000 300.000 50.000
2.500.000 6.000.000 1.500.000
fixed rate ceiling rate fixed rate
2 2 2 2
district person person person
16 16 16 16
village village village village
x x x x
50% 50% 50% 50%
x x x x
0,5 0,5 0,5 0,5
years years years years
x x x x
1 1 1 1
time time time time
x x
1 2
days days
2 2 4
2 2 4
250.000 300.000 50.000
500.000 600.000 200.000
2 2 4
250.000 300.000 50.000
500.000 600.000 200.000
fixed rate ceiling rate fixed rate
Management Fee 10 % of [1.2] 1.3 1.3.1 1
2
1.3.2 1
17.605.000
(10.000.000)
7.605.000
164.600.000
(150.000.000)
164.600.000
Coordination Meeting Province to Regional (in Regional) - 4 time From Bengkulu to Palembang Transport to Palembang Acocomodation OSA
1 1 1 1
person person person person
x x x x
0,5 0,5 0,5 0,5
years years years years
x x x x
4 4 4 4
time time time time
x x
1 2
days days
4 4 8
2.500.000 300.000 200.000
10.000.000 1.200.000 1.600.000
4 4 8
2.500.000 300.000 200.000
10.000.000 1.200.000 1.600.000
ceiling rate ceiling rate fixed rate
From Bangka Belitung to Palembang Transport to Palembang Acocomodation OSA
1 1 1 1
person person person person
x x x x
0,5 0,5 0,5 0,5
years years years years
x x x x
4 4 4 4
time time time time
x x
1 2
days days
4 4 8
1.500.000 300.000 200.000
6.000.000 1.200.000 1.600.000
4 4 8
1.500.000 300.000 200.000
6.000.000 1.200.000 1.600.000
ceiling rate ceiling rate fixed rate
District Team (DC and DFMA) to Province (in Province) - 4 time District Team (DC and DFMA) Provincial Bengkulu Transport to Bengkulu
8 8
person person
x x
0,5 0,5
years years
x x
4 4
time time
32
250.000
8.000.000
32
250.000
8.000.000
fixed rate
CONTRACT DESCRIPTION
NO.
Vol.
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 6
VARIANT
Vol.
Unit Rate [IDR]
Amount [IDR]
Vol
Unit Rate [IDR]
AMENDMENT NO. 7
Amount [IDR]
Remarks
Vol.
Unit Rate [IDR]
Amount [IDR]
2
2
3
4
5
1.3.3 1
2
3
4
5
Acocomodation OSA
8 8
person person
x x
0,5 0,5
years years
x x
4 4
time time
x x
1 2
days days
32 64
300.000 50.000
9.600.000 3.200.000
32 64
300.000 50.000
9.600.000 3.200.000
ceiling rate fixed rate
District Team (DC and DFMA) Provincial Jambi Transport to Jambi Acocomodation OSA
8 8 8 8
person person person person
x x x x
0,5 0,5 0,5 0,5
years years years years
x x x x
4 4 4 4
time time time time
x x
1 2
days days
32 32 64
250.000 300.000 50.000
8.000.000 9.600.000 3.200.000
32 32 64
250.000 300.000 50.000
8.000.000 9.600.000 3.200.000
fixed rate ceiling rate fixed rate
District Team (DC and DFMA) Provincial Babel Transport to Pangkalpinang Acocomodation OSA
4 4 4 4
person person person person
x x x x
0,5 0,5 0,5 0,5
years years years years
x x x x
4 4 4 4
time time time time
x x
1 2
days days
16 16 32
250.000 300.000 50.000
4.000.000 4.800.000 1.600.000
16 16 32
250.000 300.000 50.000
4.000.000 4.800.000 1.600.000
fixed rate ceiling rate fixed rate
20 20 20 20
person person person person
x x x x
0,5 0,5 0,5 0,5
years years years years
x x x x
4 4 4 4
time time time time
x x
1 2
days days
80 80 160
250.000 300.000 50.000
20.000.000 24.000.000 8.000.000
80 80 160
250.000 300.000 50.000
20.000.000 24.000.000 8.000.000
fixed rate ceiling rate fixed rate
District Team (DC and DFMA) Provincial Lampung Transport to Lampung Acocomodation OSA
4 4 4 4
person person person person
x x x x
0,5 0,5 0,5 0,5
years years years years
x x x x
4 4 4 4
time time time time
x x
1 2
days days
16 16 32
250.000 300.000 50.000
4.000.000 4.800.000 1.600.000
16 16 32
250.000 300.000 50.000
4.000.000 4.800.000 1.600.000
fixed rate ceiling rate fixed rate
District Team (DEAO) to Province (in Province) - 2 time District Team (DEAO) Provincial Bengkulu Transport to Bengkulu Acocomodation OSA
4 4 4 4
person person person person
x x x x
0,5 0,5 0,5 0,5
years years years years
x x x x
2 2 2 2
time time time time
x x
1 2
days days
8 8 16
250.000 300.000 50.000
2.000.000 2.400.000 800.000
8 8 16
250.000 300.000 50.000
2.000.000 2.400.000 800.000
fixed rate ceiling rate fixed rate
District Team (DEAO) Provincial Jambi Transport to Jambi Acocomodation OSA
4 4 4 4
person person person person
x x x x
0,5 0,5 0,5 0,5
years years years years
x x x x
2 2 2 2
time time time time
x x
1 2
days days
2 2 2 2
person person person person
x x x x
0,5 0,5 0,5 0,5
years years years years
x x x x
2 2 2 2
time time time time
x x
1 2
days days
10 10 10 10
person person person person
x x x x
0,5 0,5 0,5 0,5
years years years years
x x x x
2 2 2 2
time time time time
x x
1 2
days days
250.000 300.000 50.000 250.000 300.000 50.000 250.000 300.000 50.000 -
2.000.000 2.400.000 800.000 1.000.000 1.200.000 400.000 5.000.000 6.000.000 2.000.000 -
8 8 16 4 4 8 20 20 40 -
250.000 300.000 50.000 250.000 300.000 50.000 250.000 300.000 50.000 -
2.000.000 2.400.000 800.000 1.000.000 1.200.000 400.000 5.000.000 6.000.000 2.000.000 -
fixed rate ceiling rate fixed rate
District Team (DEAO) Provincial Babel Transport to Pangkalpinang Acocomodation OSA
8 8 16 4 4 8 20 20 40 -
District Team (DEAO) Provincial Lampung
2
person
x
0,5
years
x
2
time
Transport to Lampung Acocomodation OSA
2 2 2
person person person
x x x
0,5 0,5 0,5
years years years
x x x
2 2 2
time time time
x x
1 2
days days
4 4 8
250.000 300.000 50.000
1.000.000 1.200.000 400.000
4 4 8
250.000 300.000 50.000
1.000.000 1.200.000 400.000
District Team (DC and DFMA) Provincial Sumsel Transport to Palembang Acocomodation OSA
District Team (DEAO) Provincial Sumsel Transport to Palembang Acocomodation OSA
Management Fee 10 % of [1.3] 1.4 1.4.1
16.460.000
Coordination Meeting For Several Event By Request Regional Team to Province to District/Village
-
to Province Bengkulu : Transport to Bengkulu Inland Transport Acocomodation OSA
2 2 2 2
person person person person
x x x x
0,5 0,5 0,5 0,5
years years years years
x x x x
2 2 2 2
time time time time
to Provinsi Jambi : Transport to Jambi Inland Transport Acocomodation OSA
2 2 2 2
person person person person
x x x x
0,5 0,5 0,5 0,5
years years years years
x x x x
2 2 2 2
time time time time
x x
to Province Babel : Transport to Pangkal Pinang Inland Transport Acocomodation OSA
2 2 2 2
person person person person
x x x x
0,5 0,5 0,5 0,5
years years years years
x x x x
2 2 2 2
time time time time
x x
to Province Lampung Transport to Lampung
2
person
x
0,5
years
x
2
time
x x
days days
2 2 8 10
4 5
days days
2 2 8 10
4 5
days days
2 2 8 10
4 5
2
4 4 16 20 4 4 16 20 4 4 16 20 4
2.500.000 620.000 300.000 200.000 1.500.000 300.000 300.000 200.000 1.500.000 700.000 300.000 200.000 1.500.000
10.000.000 2.480.000 4.800.000 4.000.000 6.000.000 1.200.000 4.800.000 4.000.000 6.000.000 2.800.000 4.800.000 4.000.000 6.000.000
(15.000.000)
fixed rate ceiling rate fixed rate
fixed rate ceiling rate fixed rate
fixed rate ceiling rate fixed rate
1.460.000
-
88.640.000
4 4 16 20 4 4 16 20 4 4 16 20 4
2.500.000 620.000 300.000 200.000 1.500.000 300.000 300.000 200.000 1.500.000 700.000 300.000 200.000 1.500.000
10.000.000 2.480.000 4.800.000 4.000.000 6.000.000 1.200.000 4.800.000 4.000.000 6.000.000 2.800.000 4.800.000 4.000.000 6.000.000
ceiling rate fixed rate ceiling rate fixed rate
ceiling rate fixed rate ceiling rate fixed rate
ceiling rate fixed rate ceiling rate fixed rate
ceiling rate
CONTRACT DESCRIPTION
NO.
Unit Rate [IDR]
Vol.
AMENDMENT NO. 6
Amount [IDR]
Vol.
Unit Rate [IDR]
Amount [IDR]
4 16 20 4 16 20
1.520.000 300.000 200.000 1.020.000 300.000 200.000
6.080.000 4.800.000 4.000.000 4.080.000 4.800.000 4.000.000
VARIANT Vol
Unit Rate [IDR]
AMENDMENT NO. 7
Amount [IDR]
Remarks
Vol.
Unit Rate [IDR]
Amount [IDR]
4 16 20 4 16 20
1.520.000 300.000 200.000 1.020.000 300.000 200.000
6.080.000 4.800.000 4.000.000 4.080.000 4.800.000 4.000.000
2 Inland Transport Acocomodation OSA
2 2 2
person person person
x x x
0,5 0,5 0,5
years years years
x x x
2 2 2
time time time
x x
4 5
days days
2 8 10
to Province Sumatera Selatan Inland Transport Acocomodation OSA
2 2 2
person person person
x x x
0,5 0,5 0,5
years years years
x x x
2 2 2
time time time
x x
4 5
days days
2 8 10
Management Fee 10 % of [1.4] 1.5 National Meeting in Jakarta (by Request), targeted 2014 1 Regional [PM] to Jakarta Air Transport Inland Transport Acocomodation OSA 2
3
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
3 3 3 3
time time time time
x x
2 3
days days
3 3 6 9
Provincial [PC] to Jakarta Air Transport Inland Transport Acocomodation OSA
3 3 3 3
person person person person
x x x x
1 1 1 1
years years years years
x x x x
3 3 3 3
time time time time
x x
2 3
days days
9 9 18 27
District to Jakarta Air Transport Inland Transport Acocomodation OSA
-
person person person person
x x x x
1 1 1 1
years years years years
x x x x
2 2 2 2
time time time time
x x
2 3
days days
-
Management Fee 10 % of [1.5]
3 3 6 9 9 9 18 27 99.684.000
2.120.000 400.000 300.000 200.000 2.120.000 400.000 300.000 200.000 2.120.000 400.000 300.000 200.000
8.864.000
-
8.864.000
44.640.000
-
44.640.000
6.360.000 1.200.000 1.800.000 1.800.000 19.080.000 3.600.000 5.400.000 5.400.000 4.464.000
3 3 6 9 9 9 18 27 -
2.120.000 400.000 300.000 200.000 2.120.000 400.000 300.000 200.000 2.120.000 400.000 300.000 200.000
6.360.000 1.200.000 1.800.000 1.800.000 19.080.000 3.600.000 5.400.000 5.400.000 4.464.000
fixed rate ceiling rate fixed rate
ceiling rate ceiling rate fixed rate
ceiling rate fixed rate ceiling rate fixed rate
ceiling rate fixed rate ceiling rate fixed rate
ceiling rate fixed rate ceiling rate fixed rate
REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) - 2 COMMUNITY BASED WATER SUPPLY PROJECT (PAMSIMAS II) ORIGINAL CONTRACT NO.
DESCRIPTION
Vol.
Unit Rate [IDR]
1
2
3
4
B
REIMBURSABLE COST 1
Amount [IDR] 5
AMENDMENT NO. 6 Unit Rate [IDR]
Vol.
DUTY TRAVEL (TARGETED VILLAGE 2015)
VARIANT
Amount [IDR]
Unit Rate [IDR]
Vol.
AMENDMENT NO. 7
Amount [IDR]
Unit Rate [IDR]
Vol.
Amount [IDR]
1.661.810.000
(656.000.000)
1.265.810.000
501.360.000
(131.000.000)
370.360.000
1.1 Spot Checking 1.1.1 a. 1
Spot Checking Provincial Team (PC/QAS) to District to Village (Regular 6 Cycle) Provinsi Bengkulu (6 siklus disebar ke 2 cluster) 35 desa x 10% = 4 desa from Bengkulu to District Kepahiang and Rejang Lebong Inland Transport
4 4 4 4 4 4
village village village village village village
1 1 1 1 1 1
years years years years years years
x x x x x x
3 8 3 8 3 8
time time time time time time
x x x x
2 2 3 3
day(s) day(s) day(s) day(s)
4 4 4 4 4 4
village village village village village village
1 1 1 1 1 1
years years years years years years
x x x x x x
3 5 3 5 3 5
time time time time time time
x x x x
2 2 3 3
day(s) day(s) day(s) day(s)
4 4 4 4 4 4 4 4 4 4
village village village village village village village village village village
1 1 1 1 1 1 1 1 1 1
years years years years years years years years years years
x x x x x x x x x x
3 4 3 4 3 3 4 3 3 4
time time time time time time time time time time
4 4 4 4 4 4 4 4
village village village village village village village village
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
3 4 3 4 3 4 3 4
time time time time time time time time
x x x x
2 2 3 3
day(s) day(s) day(s) day(s)
Provinsi Bangka Belitung (6 siklus disebar ke 1 cluster) 20 desa x 10% = 2 desa from Pangkal Pinang to District Bangka dan Bangka Tengah Inland Transport OSA (Fixed)
2 2
village village
1 1
years years
x x
6 6
time time
x
2
day(s)
Provinsi Lampung (6 siklus disebar ke 1 cluster) 20 desa x 10% = 2 desa from Pangkal Pinang to District Tanggamus and Lampung Selatan Air Transport Inland Transport Accomodation Accomodation OSA (Fixed) OSA (Fixed)
2 2 2 2 2 2
village village village village village village
1 1 1 1 1 1
years years years years years years
x x x x x x
6 6 6 6 6 6
time time time time time time
x x x x
2 3 3 4
day(s) day(s) day(s) day(s)
10 10 10 10 10 10
village village village village village village
1 1 1 1 1 1
years years years years years years
x x x x x x
2 3 2 3 2 3
time time time time time time
x x x x
5 5 6 6
day(s) day(s) day(s) day(s)
Accomodation OSA (fixed)
2
from Bengkulu to District Bengkulu Selatan and Kaur Inland Transport Accomodation OSA (Fixed)
b. 1
Provinsi Jambi (6 siklus disebar ke 2 cluster) 33 desa x 10% = 4 desa from Bengkulu to District Merangin and Sorolangun Air Transport Inland Transport Accomodation Accomodation OSA (Fixed) OSA (Fixed)
2
from Bengkulu to District Bungo and Kerinci Air Transport Inland Transport Accomodation OSA (Fixed)
c. 1
d. 1
e. 1
Provinsi Sumatera Selatan (6 siklus disebar ke 4 cluster) 97 desa x 10% = 10 desa from Palembang to District Ogan Ilir, OKI and MUBA Inland Transport Accomodation OSA (Fixed)
2
from Palembang to District OKU , OKUT and OKUS
x x x x x x
2 3 3 3 4 4
day(s) day(s) day(s) day(s) day(s) day(s)
8
485.000
3.880.000
8
485.000
3.880.000
16
300.000
4.800.000
16
300.000
4.800.000
24
200.000
4.800.000
24
200.000
4.800.000
5
620.000
10
300.000
15
200.000
3.100.000 3.000.000 3.000.000
5
620.000
10
300.000
15
200.000
3.100.000 3.000.000 3.000.000
4
4.480.000
17.920.000
4
4.480.000
17.920.000
4
1.095.000
4.380.000
4
1.095.000
4.380.000
12
300.000
3.600.000
12
300.000
3.600.000
16
200.000
3.200.000
16
200.000
3.200.000
4
4.480.000
17.920.000
4
4.480.000
17.920.000
4
940.000
3.760.000
4
940.000
3.760.000
8
300.000
2.400.000
8
300.000
2.400.000
12
200.000
2.400.000
12
200.000
2.400.000
6 12
700.000 200.000
4.200.000 2.400.000
6 12
700.000 200.000
4.200.000 2.400.000
6 6
3.480.000 1.520.000
20.880.000 9.120.000
6 6
3.480.000 1.520.000
20.880.000 9.120.000
18
300.000
5.400.000
18
300.000
5.400.000
24
200.000
4.800.000
24
200.000
4.800.000
3
1.450.000
15
300.000
4.350.000 4.500.000
18
200.000
3.600.000
-
-
-
3
1.450.000
15
300.000
4.350.000 4.500.000
18
200.000
3.600.000
ORIGINAL CONTRACT NO.
DESCRIPTION
Vol.
Unit Rate [IDR]
Amount [IDR]
1
2
3
4
5
Inland Transport
10 10 10 10 10 10
village village village village village village
1 1 1 1 1 1
years years years years years years
x x x x x x
2 3 2 3 2 3
time time time time time time
x x x x
5 5 6 6
day(s) day(s) day(s) day(s)
from Palembang to District Muara Enim and Lahat Inland Transport Accomodation OSA (Fixed)
10 10 10
village village village
1 1 1
years years years
x x x
1 1 1
time time time
x x
5 6
from Palembang to District Musi Rawas and Empat Lawang Inland Transport Accomodation OSA (Fixed)
10 10 10
village village village
1 1 1
years years years
x x x
1 1 1
time time time
x x
4 4 4 4 4 4
village village village village village village
years years years years years years
x x x x x x
1 2 1 2 1 2
time time time time time time
4 4 4 4 4 4
village village village village village village
years years years years years years
x x x x x x
1 2 1 2 1 2
time time time time time time
4 4 4 4 4 4 4 4
village village village village village village village village
years years years years years years years years
x x x x x x x x
1 2 1 2 1 2 1 2
time time time time time time time time
4 4 4 4 4 4 4 4
village village village village village village village village
years years years years years years years years
x x x x x x x x
1 2 1 2 1 2 1 2
time time time time time time time time
x x x x
2 2 3 3
day(s) day(s) day(s) day(s)
Provinsi Bangka Belitung (2 kabupaten x 2 = 4 desa) from Pangkal Pinang to District Bangka dan Bangka Tengah Inland Transport OSA (Fixed)
4 4
village village
years years
x x
1 1
time time
x
2
Provinsi Lampung (2 kabupaten x 2 = 4 desa) from Pangkal Pinang to District Tanggamus and Lampung Selatan Air Transport Inland Transport Accomodation OSA (Fixed)
4 4 4 4
village village village village
years years years years
x x x x
1 1 1 1
time time time time
x x
Provinsi Sumatera Selatan (10 kabupaten x 2 = 20 desa) from Palembang to District Ogan Ilir, OKI and MUBA Inland Transport Accomodation OSA (Fixed)
6 6 6
village village village
years years years
x x x
1 1 1
time time time
x x
Accomodation OSA (Fixed)
3
4
1.1.2 a. 1
Spot Checking Provincial Team (PC/QAS) to District to Village (Sustainability 1 cycle) Provinsi Bengkulu (4 kabupaten x 2 = 8 desa) from Bengkulu to District Kepahiang and Rejang Lebong Inland Transport Accomodation OSA (Fixed)
2
from Bengkulu to District Bengkulu Selatan and Kaur Inland Transport Accomodation OSA (Fixed)
b. 1
Provinsi Jambi (4 kabupaten x 2 = 8 desa) from Bengkulu to District Merangin and Sorolangun Air Transport Inland Transport Accomodation OSA (Fixed)
2
from Bengkulu to District Bungo and Kerinci Air Transport Inland Transport Accomodation OSA (Fixed)
c. 1
d. 1
e. 1
AMENDMENT NO. 6 Unit Rate [IDR]
Vol.
VARIANT
Amount [IDR]
3
1.020.000
3.060.000
15
300.000
4.500.000
18
200.000
3.600.000
day(s) day(s)
1 5 6
900.000 300.000 200.000
5 6
day(s) day(s)
1 5 6
850.000 300.000 200.000
2 x x x x
2 2 3 3
day(s) day(s) day(s) day(s)
4
x x x x
2 2 3 3
day(s) day(s) day(s) day(s)
x x x x
Unit Rate [IDR]
Vol.
-
-
AMENDMENT NO. 7
Amount [IDR]
Unit Rate [IDR]
Vol.
-
Amount [IDR]
3
1.020.000
3.060.000
15
300.000
4.500.000
18
200.000
3.600.000
900.000 1.500.000 1.200.000
1 5 6
900.000 300.000 200.000
900.000 1.500.000 1.200.000
850.000 1.500.000 1.200.000
1 5 6
850.000 300.000 200.000
850.000 1.500.000 1.200.000
485.000
970.000
2
485.000
970.000
300.000
1.200.000
4
300.000
1.200.000
6
200.000
1.200.000
6
200.000
1.200.000
2
620.000
1.240.000
2
620.000
1.240.000
4
620.000
2.480.000
4
620.000
2.480.000
6
620.000
3.720.000
6
620.000
3.720.000
2
4.480.000
8.960.000
2
4.480.000
8.960.000
2
1.095.000
1.095.000
300.000
2.190.000 1.200.000
2
4
4
300.000
2.190.000 1.200.000
6
200.000
1.200.000
6
200.000
1.200.000
2
4.480.000
8.960.000
2
4.480.000
8.960.000
2
940.000
1.880.000
2
940.000
1.880.000
4
300.000
1.200.000
4
300.000
1.200.000
6
200.000
1.200.000
6
200.000
1.200.000
day(s)
1 2
550.000 200.000
550.000 400.000
1 2
550.000 200.000
550.000 400.000
2 3
day(s) day(s)
1 1 2 3
3.480.000 1.520.000 300.000 200.000
3.480.000 1.520.000 600.000 600.000
1 1 2 3
3.480.000 1.520.000 300.000 200.000
3.480.000 1.520.000 600.000 600.000
3 4
day(s) day(s)
1 3 4
1.450.000 300.000 200.000
1.450.000 900.000 800.000
1 3 4
1.450.000 300.000 200.000
1.450.000 900.000 800.000
2 2 3 3
day(s) day(s) day(s) day(s)
-
-
-
-
-
-
ORIGINAL CONTRACT NO.
DESCRIPTION
Vol.
Unit Rate [IDR]
Amount [IDR]
1
2
3
4
5
2
3
4
1.1.3 a. 1
2
b. 1
2
2
Vol.
Unit Rate [IDR]
Amount [IDR]
Unit Rate [IDR]
Vol.
Amount [IDR]
village village village
years years years
x x x
1 1 1
time time time
x x
2 3
day(s) day(s)
1 2 3
1.020.000 300.000 200.000
1.020.000 600.000 600.000
1 2 3
1.020.000 300.000 200.000
1.020.000 600.000 600.000
from Palembang to District Muara Enim and Lahat Inland Transport Accomodation OSA (Fixed)
4 4 4
village village village
years years years
x x x
1 1 1
time time time
x x
2 3
day(s) day(s)
1 2 3
900.000 300.000 200.000
900.000 600.000 600.000
1 2 3
900.000 300.000 200.000
900.000 600.000 600.000
from Palembang to District Musi Rawas and Empat Lawang Inland Transport Accomodation OSA (Fixed)
2 2 2
village village village
years years years
x x x
1 1 1
time time time
x x
1 2
day(s) day(s)
1 1 2
850.000 300.000 200.000
850.000 300.000 400.000
1 1 2
850.000 300.000 200.000
850.000 300.000 400.000
4
Spot Checking Provincial Team - Financial Management Specialist (FMS) to District/ Village (regular 6 cycle) Provinsi Bengkulu (6 siklus disebar ke 2 cluster) 35 desa x 10% = 4 desa from Bengkulu to District Kepahiang and Rejang Lebong Inland Transport 4 village 4 village Accomodation 4 village 4 village OSA (fixed) 4 village 4 village
1 1 1 1 1 1
years years years years years years
x x x x x x
3 4 3 4 3 4
time time time time time time
485.000
1.940.000
4
485.000
1.940.000
x x x x
2 2 3 3
day(s) day(s) day(s) day(s)
8
300.000
2.400.000
8
300.000
2.400.000
12
200.000
2.400.000
12
200.000
2.400.000
from Bengkulu to District Bengkulu Selatan and Kaur Inland Transport Accomodation OSA (Fixed)
4 4 4
village village village
1 1 1
years years years
x x x
3 3 3
time time time
x x
2 3
day(s) day(s)
3 6 9
620.000 300.000 200.000
1.860.000 1.800.000 1.800.000
3 6 9
620.000 300.000 200.000
1.860.000 1.800.000 1.800.000
Provinsi Jambi (6 siklus disebar ke 2 cluster) 33 desa x 10% = 4 desa from Bengkulu to District Merangin and Sorolangun Air Transport Inland Transport Accomodation Accomodation OSA (Fixed) OSA (Fixed)
4 4 4 4 4 4
village village village village village village
1 1 1 1 1 1
years years years years years years
x x x x x x
3 3 3 3 3 3
time time time time time time
3 3
4.480.000 1.095.000
13.440.000 3.285.000
3 3
4.480.000 1.095.000
13.440.000 3.285.000
-
300.000
-
-
300.000
-
-
-
-
-
-
-
4 4 4 4 4 4 4 4 4 4
village village village village village village village village village village
1 1 1 1 1 1 1 1 1 1
years years years years years years years years years years
x x x x x x x x x x
3 4 3 4 3 3 4 3 3 4
time time time time time time time time time time
4
4.480.000
17.920.000
4
4.480.000
17.920.000
4
940.000
3.760.000
4
940.000
3.760.000
x x x x x x
2 4 4 3 5 5
day(s) day(s) day(s) day(s) day(s) day(s)
16
300.000
4.800.000
16
300.000
4.800.000
20
200.000
4.000.000
20
200.000
4.000.000
Provinsi Bangka Belitung (6 siklus disebar ke 1 cluster) 20 desa x 10% = 2 desa from Pangkal Pinang to District Bangka dan Bangka Tengah Inland Transport OSA (Fixed)
2 2
village village
1 1
years years
x x
6 6
time time
x
2
day(s)
6 12
700.000 200.000
4.200.000 2.400.000
6 12
700.000 200.000
4.200.000 2.400.000
Provinsi Lampung (6 siklus disebar ke 1 cluster) 20 desa x 10% = 2 desa from Pangkal Pinang to District Tanggamus and Lampung Selatan Air Transport Inland Transport Accomodation Accomodation OSA (Fixed) OSA (Fixed)
2 2 2 2 2 2
village village village village village village
1 1 1 1 1 1
years years years years years years
x x x x x x
6 6 6 6 6 6
time time time time time time
6 6
3.480.000 1.520.000
20.880.000 9.120.000
6 6
3.480.000 1.520.000
20.880.000 9.120.000
x x x x
2 4 3 5
day(s) day(s) day(s) day(s)
-
300.000
-
-
300.000
-
-
200.000
-
-
200.000
-
10 10 10
village village village
1 1 1
years years years
x x x
2 2 2
time time time
x x
5 6
day(s) day(s)
2 10 12
1.450.000 300.000 200.000
2.900.000 3.000.000 2.400.000
2 10 12
1.450.000 300.000 200.000
2.900.000 3.000.000 2.400.000
from Bengkulu to District Bungo and Kerinci Air Transport
OSA (Fixed) OSA (Fixed)
e. 1
Amount [IDR]
AMENDMENT NO. 7
4 4 4
Accomodation Accomodation
d. 1
Unit Rate [IDR]
Vol.
VARIANT
from Palembang to District OKU , OKUT and OKUS Inland Transport Accomodation OSA (Fixed)
Inland Transport
c. 1
AMENDMENT NO. 6
Provinsi Sumatera Selatan (6 siklus disebar ke 4 cluster) 97 desa x 10% = 10 desa from Palembang to District Ogan Ilir, OKI and MUBA Inland Transport Accomodation OSA (Fixed) from Palembang to District OKU , OKUT and OKUS
x x x x
2 4 3 5
day(s) day(s) day(s) day(s)
ORIGINAL CONTRACT NO.
DESCRIPTION
Vol.
Unit Rate [IDR]
Amount [IDR]
1
2
3
4
5
Inland Transport Accomodation OSA (Fixed) 3
10 10 10
village village village
1 1 1
years years years
x x x
2 2 2
time time time
x x
5 6
day(s) day(s)
10 10 10 10 10 10
village village village village village village
1 1 1 1 1 1
years years years years years years
x x x x x x
1 2 1 2 1 2
time time time time time time
x x x x
5 5 6 6
day(s) day(s) day(s) day(s)
10 10 10 10 10 10
village village village village village village
1 1 1 1 1 1
years years years years years years
x x x x x x
1 2 1 2 1 2
time time time time time time
x x x x
5 5 6 6
day(s) day(s) day(s) day(s)
Spot Checking Provincial Team - Financial Management Specialist (FMS) to District / Village (Sustainability 1 Cycle) Provinsi Bengkulu (4 kabupaten x 2 = 8 desa) from Bengkulu to District Kepahiang and Rejang Lebong Inland Transport 4 village 4 village Accomodation 4 village 4 village OSA (Fixed) 4 village 4 village
years years years years years years
x x x x x x
1 5 1 5 1 5
time time time time time time
x x x x
2 2 3 3
day(s) day(s) day(s) day(s)
from Bengkulu to District Bengkulu Selatan and Kaur Inland Transport Accomodation OSA (Fixed)
x x
2 3
day(s) day(s)
from Palembang to District Muara Enim and Lahat Inland Transport Accomodation OSA (Fixed)
4
from Palembang to District Musi Rawas and Empat Lawang Inland Transport Accomodation OSA (Fixed)
1.1.4 a. 1
2
b. 1
4 4 4
village village village
years years years
x x x
1 1 1
time time time
4 4 4 4 4 4 4 4 4 4
village village village village village village village village village village
years years years years years years years years years years
x x x x x x x x x x
1 2 1 2 1 1 2 1 1 2
time time time time time time time time time time
4 4 4 4 4 4 4 4
village village village village village village village village
years years years years years years years years
x x x x x x x x
1 3 1 3 1 3 1 3
time time time time time time time time
x x x x
2 2 3 3
day(s) day(s) day(s) day(s)
Provinsi Bangka Belitung (2 kabupaten x 2 = 4 desa) from Pangkal Pinang to District Bangka dan Bangka Tengah Inland Transport OSA (Fixed)
4 4
village village
years years
x x
1 1
time time
x
3
day(s)
Provinsi Lampung (2 kabupaten x 2 = 4 desa) from Pangkal Pinang to District Tanggamus and Lampung Selatan Air Transport Inland Transport Accomodation Accomodation OSA (Fixed) OSA (Fixed)
4 4 4 4 4 4
village village village village village village
years years years years years years
x x x x x x
1 1 1 1 1 1
time time time time time time
x x x x
2 4 3 5
day(s) day(s) day(s) day(s)
Provinsi Jambi (4 kabupaten x 2 = 8 desa) from Bengkulu to District Merangin and Sorolangun Air Transport Inland Transport Accomodation Accomodation
`
2
OSA (Fixed) OSA (Fixed)
from Bengkulu to District Bungo and Kerinci Air Transport Inland Transport Accomodation OSA (Fixed)
c. 1
d. 1
e.
Provinsi Sumatera Selatan (10 kabupaten x 2 = 20 desa)
x x x x x x
2 4 4 3 5 5
day(s) day(s) day(s) day(s) day(s) day(s)
AMENDMENT NO. 6 Unit Rate [IDR]
Vol.
VARIANT
Amount [IDR]
2 10 12
1.020.000 300.000 200.000
2.040.000 3.000.000 2.400.000
Vol.
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 7 Unit Rate [IDR]
Vol.
Amount [IDR]
2 10 12
1.020.000 300.000 200.000
2.040.000 3.000.000 2.400.000
2
900.000
1.800.000
2
900.000
1.800.000
10
300.000
3.000.000
10
300.000
3.000.000
12
200.000
2.400.000
12
200.000
2.400.000
2
850.000
1.700.000
2
850.000
1.700.000
10
300.000
3.000.000
10
300.000
3.000.000
12
200.000
2.400.000
12
200.000
2.400.000
5
485.000
2.425.000
5
485.000
2.425.000
10
300.000
3.000.000
10
300.000
3.000.000
15
200.000
3.000.000
15
200.000
3.000.000
1 2 3
620.000 300.000 200.000
620.000 600.000 600.000
1 2 3
620.000 300.000 200.000
620.000 600.000 600.000
2
4.480.000
8.960.000
2
4.480.000
8.960.000
2
1.095.000
2.190.000
2
1.095.000
2.190.000
8
300.000
2.400.000
8
300.000
2.400.000
10
200.000
2.000.000
10
200.000
2.000.000
3
4.480.000
13.440.000
3
4.480.000
13.440.000
3
940.000
2.820.000
3
940.000
2.820.000
6
300.000
1.800.000
6
300.000
1.800.000
9
200.000
1.800.000
9
200.000
1.800.000
1 3
550.000 200.000
550.000 600.000
1 3
550.000 200.000
550.000 600.000
1 1
3.480.000 1.520.000
3.480.000 1.520.000
1 1
3.480.000 1.520.000
3.480.000 1.520.000
ORIGINAL CONTRACT NO.
DESCRIPTION
Vol.
Unit Rate [IDR]
Amount [IDR]
1
2
3
4
5
1
2
3
4
1.1.5 a. 1
2
Unit Rate [IDR]
Amount [IDR]
Unit Rate [IDR]
Vol.
Amount [IDR]
years years years
x x x
1 1 1
time time time
x x
3 4
day(s) day(s)
1 3 4
1.450.000 300.000 200.000
1.450.000 900.000 800.000
1 3 4
1.450.000 300.000 200.000
1.450.000 900.000 800.000
from Palembang to District OKU , OKUT and OKUS Inland Transport Accomodation OSA (Fixed)
4 4 4
village village village
years years years
x x x
1 1 1
time time time
x x
2 3
day(s) day(s)
1 2 3
1.020.000 300.000 200.000
1.020.000 600.000 600.000
1 2 3
1.020.000 300.000 200.000
1.020.000 600.000 600.000
from Palembang to District Muara Enim and Lahat Inland Transport Accomodation OSA (Fixed)
4 4 4
village village village
years years years
x x x
1 1 1
time time time
x x
2 3
day(s) day(s)
1 2 3
900.000 300.000 200.000
900.000 600.000 600.000
1 2 3
900.000 300.000 200.000
900.000 600.000 600.000
from Palembang to District Musi Rawas and Empat Lawang Inland Transport Accomodation OSA (Fixed)
2 2 2
village village village
years years years
x x x
1 1 1
time time time
x x
1 2
day(s) day(s)
1 1 2
850.000 300.000 200.000
850.000 300.000 400.000
1 1 2
850.000 300.000 200.000
850.000 300.000 400.000
person person
5 5
village village
1 1
years years
x x
6 6
time time
x
3
day(s)
12 36
200.000 50.000
2.400.000 1.800.000
12 36
200.000 50.000
2.400.000 1.800.000
person person person
1 1 1
village village village
6 6 6
years years years
x x x
1 1 1
time time time
x x x
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
5 5 5 5 5
village village village village village
1 1 1 1 1
years years years years years
x x x x x
6 6 8 6 8
time time time time time
16
200.000
3.200.000
16
200.000
3.200.000
x x
3 3
day(s) day(s)
48
50.000
2.400.000
48
50.000
2.400.000
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
Spot Checking District Team (DC and DFMA) to 50% Village (6 cycle) Bengkulu Province (6 siklus) Kepahiang (10 village) - remote Spot Checking for Regular (6 Phase) Inland Transport 2 OSA 2 Spot Checking for Sustainability (1 Phase) Inland Transport 1 Inland Transport 1 OSA 1 Rejang Lebong (10 village) Spot Checking for Regular (6 Phase) Inland Transport Inland Transport
Kaur (10 village) Spot Checking for Regular (6 Phase) Inland Transport Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Bengkulu Selatan (10 village) Spot Checking for Regular (6 Phase) Inland Transport Inland Transport
Spot Checking for Sustainability (1 Phase) Inland Transport OSA
2
Vol.
village village village
OSA
b. 1
Amount [IDR]
AMENDMENT NO. 7
6 6 6
Spot Checking for Sustainability (1 Phase) Inland Transport OSA
4
Unit Rate [IDR]
Vol.
VARIANT
from Palembang to District Ogan Ilir, OKI and MUBA Inland Transport Accomodation OSA (Fixed)
OSA
3
AMENDMENT NO. 6
Jambi Province Merangin (10 village) Spot Checking for Regular (6 Phase) Inland Transport Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Sorolangun (5 village)
2 2 2 2 2
person person person person person
1 1
person person
1 1
village village
6 6
years years
x x
1 1
time time
x
1
day(s)
1 1
2 2 2
person person person
5 5 5
village village village
1 1 1
years years years
x x x
6 6 6
time time time
x
3
day(s)
12 36
200.000 50.000
2.400.000 1.800.000
12 36
200.000 50.000
2.400.000 1.800.000
1 1
person person
1 1
village village
6 6
years years
x x
1 1
time time
x
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
2 2 2 2 2
person person person person person
5 5 5 5 5
village village village village village
1 1 1 1 1
years years years years years
x x x x x
6 6 8 6 8
time time time time time
16
200.000
3.200.000
16
200.000
3.200.000
x x
3 3
day(s) day(s)
48
50.000
2.400.000
48
50.000
2.400.000
1 1
person person
1 1
village village
6 6
years years
x x
1 1
time time
x
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
2 2 2
person person person
5 5 5
village village village
1 1 1
years years years
x x x
6 6 6
time time time
x
3
day(s)
12 36
200.000 50.000
2.400.000 1.800.000
12 36
200.000 50.000
2.400.000 1.800.000
1 1
person person
1 1
village village
6 6
years years
x x
1 1
time time
x x
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
x x x x
x x
ORIGINAL CONTRACT NO.
DESCRIPTION
Vol.
Unit Rate [IDR]
Amount [IDR]
1
2
3
4
5
Spot Checking for Regular (6 Phase) Inland Transport Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA 3
4
Bungo (10 village) Spot Checking for Regular (6 Phase) Inland Transport Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Kerinci (8 village) Spot Checking for Regular (6 Phase) Inland Transport Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA
c. 1
2
Bangka Belitung Province Bangka (10 village) Spot Checking for Regular (6 Phase) Inland Transport Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Bangka Tengah (10 village) Spot Checking for Regular (6 Phase) Inland Transport Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA
d. 1
Sumatera Selatan Province Ogan Ilir (10 village) Spot Checking for Regular (6 Phase) Inland Transport Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA
2
3
Ogan Komering Ilir (10 village) Spot Checking for Regular (6 Phase) Inland Transport Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA OKU Timur (8 village) Spot Checking for Regular (6 Phase) Inland Transport
AMENDMENT NO. 6 Unit Rate [IDR]
Vol.
VARIANT
Amount [IDR]
Vol.
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 7 Unit Rate [IDR]
Vol.
Amount [IDR]
2 2 2
person person person
3 3 3
village village village
1 1 1
years years years
x x x
6 6 6
time time time
x
2
day(s)
12 24
200.000 50.000
2.400.000 1.200.000
12 24
200.000 50.000
2.400.000 1.200.000
1 1
person person
1 1
village village
6 6
years years
x x
1 1
time time
x
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
2 2 2
person person person
5 5 5
village village village
1 1 1
years years years
x x x
6 6 6
time time time
x
3
day(s)
12 36
200.000 50.000
2.400.000 1.800.000
12 36
200.000 50.000
2.400.000 1.800.000
1 1
person person
1 1
village village
6 6
years years
x x
1 1
time time
x
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
2 2 2 2 2
person person person person person
4 4 4 4 4
village village village village village
1 1 1 1 1
years years years years years
x x x x x
6 6 8 6 8
time time time time time
16
200.000
3.200.000
16
200.000
3.200.000
x x
2 2
day(s) day(s)
32
50.000
1.600.000
32
50.000
1.600.000
1 1
person person
1 1
village village
6 6
years years
x x
1 1
time time
x x
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
2 2 2
person person person
5 5 5
village village village
1 1 1
years years years
x x x
6 6 6
time time time
x
3
day(s)
12 36
200.000 50.000
2.400.000 1.800.000
12 36
200.000 50.000
2.400.000 1.800.000
1 1
person person
1 1
village village
6 6
years years
x x
1 1
time time
x
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
2 2 2 2 2
person person person person person
5 5 5 5 5
village village village village village
1 1 1 1 1
years years years years years
x x x x x
6 6 8 6 8
time time time time time
16
200.000
3.200.000
16
200.000
3.200.000
x x
3 3
day(s) day(s)
48
50.000
2.400.000
48
50.000
2.400.000
1 1
person person
1 1
village village
6 6
years years
x x
1 1
time time
x
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
2 2 2 2 2
person person person person person
5 5 5 5 5
village village village village village
1 1 1 1 1
years years years years years
x x x x x
6 6 8 6 8
time time time time time
16
200.000
3.200.000
16
200.000
3.200.000
x x
3 3
day(s) day(s)
48
50.000
2.400.000
48
50.000
2.400.000
1 1
person person
1 1
village village
6 6
years years
x x
1 1
time time
x
1
day(s)
1 1
100.000 -
100.000 -
1 1
100.000 -
100.000 -
2 2 2
person person person
5 5 5
village village village
1 1 1
years years years
x x x
6 6 6
time time time
x
3
day(s)
12 36
200.000 50.000
2.400.000 1.800.000
12 36
200.000 50.000
2.400.000 1.800.000
1 1
person person
1 1
village village
6 6
years years
x x
1 1
time time
x
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
2
person
4
village
1
years
x
6
time
ORIGINAL CONTRACT NO.
DESCRIPTION
Vol.
Unit Rate [IDR]
Amount [IDR]
1
2
3
4
5
Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA 4
5
OKU Selatan (10 village) Spot Checking for Regular (6 Phase) Inland Transport Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Muara Enim (9 village) Spot Checking for Regular (6 Phase) Inland Transport Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA
6
7
Lahat (10 village) Spot Checking for Regular (6 Phase) Inland Transport Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Musi Rawas (8 village) Spot Checking for Regular (6 Phase) Inland Transport Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA
8
Musi Banyuasin (10 village) Spot Checking for Regular (6 Phase) Inland Transport Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA
9
10
Empat Lawang (10 village) Spot Checking for Regular (6 Phase) Inland Transport Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Ogan Komering Ulu (10 village) Spot Checking for Regular (6 Phase) Inland Transport Inland Transport OSA
AMENDMENT NO. 6 Unit Rate [IDR]
Vol.
VARIANT
Amount [IDR]
Vol.
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 7 Unit Rate [IDR]
Vol.
Amount [IDR]
2 2
person person
4 4
village village
1 1
years years
x x
6 6
time time
x
2
day(s)
12 24
200.000 50.000
2.400.000 1.200.000
12 24
200.000 50.000
2.400.000 1.200.000
2 2
person person
1 1
village village
6 6
years years
x x
1 1
time time
x
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
2 2 2
person person person
5 5 5
village village village
1 1 1
years years years
x x x
6 6 6
time time time
x
3
day(s)
12 36
200.000 50.000
2.400.000 1.800.000
12 36
200.000 50.000
2.400.000 1.800.000
2 2
person person
1 1
village village
6 6
years years
x x
1 1
time time
x
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
2 2 2 2 2
person person person person person
5 5 5 5 5
village village village village village
1 1 1 1 1
years years years years years
x x x x x
6 6 9 6 9
time time time time time
18
200.000
3.600.000
18
200.000
3.600.000
2 2
person person
1 1
village village
6 6
years years
x x
1 1
time time
x
2 2 2
person person person
5 5 5
village village village
1 1 1
years years years
x x x
6 6 6
time time time
2 2
person person
1 1
village village
6 6
years years
x x
1 1
2 2 2 2 2
person person person person person
4 4 4 4 4
village village village village village
1 1 1 1 1
years years years years years
x x x x x
2 2
person person
1 1
village village
6 6
years years
2 2 2 2 2
person person person person person
5 5 5 5 5
village village village village village
1 1 1 1 1
2 2
person person
1 1
village village
2 2 2
person person person
5 5 5
2 2
person person
2 2 2 2 2
person person person person person
x x
x x
3 3
day(s) day(s)
54
50.000
2.700.000
54
50.000
2.700.000
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
x
3
day(s)
12 36
200.000 50.000
2.400.000 1.800.000
12 36
200.000 50.000
2.400.000 1.800.000
time time
x
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
6 6 9 6 9
time time time time time
18
200.000
3.600.000
18
200.000
3.600.000
x x
2 2
day(s) day(s)
36
50.000
1.800.000
36
50.000
1.800.000
x x
1 1
time time
x
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
years years years years years
x x x x x
6 6 9 6 9
time time time time time
18
200.000
3.600.000
18
200.000
3.600.000
x x
3 3
day(s) day(s)
54
50.000
2.700.000
54
50.000
2.700.000
6 6
years years
x x
1 1
time time
x
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
village village village
1 1 1
years years years
x x x
6 6 6
time time time
x
3
day(s)
12 36
200.000 50.000
2.400.000 1.800.000
12 36
200.000 50.000
2.400.000 1.800.000
1 1
village village
6 6
years years
x x
1 1
time time
x
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
5 5 5 5 5
village village village village village
1 1 1 1 1
years years years years years
x x x x x
6 6 7 6 7
time time time time time
14
200.000
2.800.000
14
200.000
2.800.000
x x
3 3
day(s) day(s)
42
50.000
2.100.000
42
50.000
2.100.000
ORIGINAL CONTRACT NO.
DESCRIPTION
Vol.
Unit Rate [IDR]
Amount [IDR]
1
2
3
4
5
Spot Checking for Sustainability (1 Phase) Inland Transport OSA e. 1
2
Lampung Province Lampung Selatan (10 village) Spot Checking for Regular (6 Phase) Inland Transport Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Tanggamus (10 village) Spot Checking for Regular (6 Phase) Inland Transport Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA
AMENDMENT NO. 6 Unit Rate [IDR]
Vol.
2
Inland Transport Acocomodation OSA
3
to Province Babel : Transport to Pangkal Pinang Inland Transport Acocomodation OSA
4
to Province Lampung Transport to Lampung Inland Transport Acocomodation OSA
Vol.
Unit Rate [IDR]
Amount [IDR]
Unit Rate [IDR]
Vol.
Amount [IDR]
person person
1 1
village village
6 6
years years
x x
1 1
time time
x
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
2 2 2
person person person
5 5 5
village village village
1 1 1
years years years
x x x
6 6 6
time time time
x
3
day(s)
12 36
200.000 50.000
2.400.000 1.800.000
12 36
200.000 50.000
2.400.000 1.800.000
2 2
person person
1 1
village village
6 6
years years
x x
1 1
time time
x
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
2 2 2
person person person
5 5 5
village village village
1 1 1
years years years
x x x
6 6 6
time time time
12
200.000
2.400.000
12
200.000
2.400.000
x
3
day(s)
2 2
person person
1 1
village village
6 6
years years
x x
1 1
time time
x
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
Monitoring Evaluation Regional Team to Province and District (targeted 2015) From Regional to Province/District/Vilage Project Manager (PM) to Province Bengkulu : Transport to Bengkulu 1 person 1 person Inland Transport 1 person 1 person Acocomodation 1 person 1 person OSA 1 person 1 person to Provinsi Jambi : Transport to Jambi
Amount [IDR]
AMENDMENT NO. 7
2 2
Management Fee 10 % of [1.1] 1.2 1.2.1 a 1
VARIANT
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
1 2 1 2 1 2 1 2
time time time time time time time time
x x x x
4 4 5 5
days days days days
50.136.000
(13.100.000)
37.036.000
519.570.000
(125.000.000)
394.570.000
2
2.500.000
2
620.000
5.000.000 1.240.000
2
2.500.000
2
620.000
5.000.000 1.240.000
8
300.000
2.400.000
8
300.000
2.400.000
10
200.000
2.000.000
10
200.000
2.000.000
2
1.500.000
3.000.000
2
1.500.000
3.000.000
2
1.095.000
2.190.000
2
1.095.000
2.190.000
8
300.000
2.400.000
8
300.000
2.400.000
10
200.000
2.000.000
10
200.000
2.000.000
2
1.500.000
2
1.500.000
2
700.000
2
700.000
1 1 1 1 1 1 1 1
person person person person person person person person
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
1 2 1 2 1 2 1 2
time time time time time time time time
1 1 1 1 1 1 1 1
person person person person person person person person
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
1 2 1 2 1 2 1 2
time time time time time time time time
x x x x
4 4 5 5
days days days days
8
300.000
3.000.000 1.400.000 2.400.000
8
300.000
3.000.000 1.400.000 2.400.000
10
200.000
2.000.000
10
200.000
2.000.000
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
1 1 1 1
time time time time
x x
4 5
days days
1 1 4 5
1.500.000 1.520.000 300.000 200.000
1.500.000 1.520.000 1.200.000 1.000.000
1 1 4 5
1.500.000 1.520.000 300.000 200.000
1.500.000 1.520.000 1.200.000 1.000.000
x x x x
4 4 5 5
days days days days
ORIGINAL CONTRACT NO.
DESCRIPTION
Vol.
Unit Rate [IDR]
Amount [IDR]
1
2
3
4
5
5
b 1
2
3
4
5
to Province Sumatera Selatan Inland Transport Acocomodation OSA
1 1 1
person person person
x x x
1 1 1
years years years
x x x
1 1 1
time time time
Legal Government Specialist ( LGS ) to Province Bengkulu : Transport to Bengkulu Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
1 1 1 1
time time time time
x x
2 3
to Provinsi Jambi : Transport to Jambi Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
1 1 1 1
time time time time
x x
to Province Babel : Transport to Pangkal Pinang Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
1 1 1 1
time time time time
to Province Lampung Transport to Lampung Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
1 1 1 1
1 1 1 1 1 1
person person person person person person
x x x x x x
1 1 1 1 1 1
years years years years years years
x x x x x x
Training Coordinator ( TC ) to Province Bengkulu : Transport to Bengkulu Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
to Provinsi Jambi : Transport to Jambi Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
1 1 1 1 1 1 1 1
person person person person person person person person
x x x x x x x x
1 1 1 1
person person person person
1 1 1 1 1
person person person person person
to Province Sumatera Selatan Inland Transport to District Acocomodation OSA
c 1
2
3
to Province Babel : Transport to Pangkal Pinang Inland Transport Acocomodation OSA
4
5
to Province Lampung Transport to Lampung Inland Transport Acocomodation OSA to Province Sumatera Selatan Inland Transport Acocomodation OSA
AMENDMENT NO. 6 Unit Rate [IDR]
Vol.
VARIANT
Amount [IDR]
Vol.
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 7 Unit Rate [IDR]
Vol.
Amount [IDR]
1 4 5 -
1.020.000 300.000 200.000 -
1.020.000 1.200.000 1.000.000 -
1 4 5 -
1.020.000 300.000 200.000 -
1.020.000 1.200.000 1.000.000 -
days days
1 1 2 3
2.500.000 620.000 300.000 200.000
2.500.000 620.000 600.000 600.000
1 1 2 3
2.500.000 620.000 300.000 200.000
2.500.000 620.000 600.000 600.000
2 3
days days
1 1 2 3
1.500.000 1.095.000 300.000 200.000
1.500.000 1.095.000 600.000 600.000
1 1 2 3
1.500.000 1.095.000 300.000 200.000
1.500.000 1.095.000 600.000 600.000
x x
2 3
days days
1 1 2 3
1.500.000 700.000 300.000 200.000
1.500.000 700.000 600.000 600.000
1 1 2 3
1.500.000 700.000 300.000 200.000
1.500.000 700.000 600.000 600.000
time time time time
x x
2 3
days days
1 1 2 3
1.500.000 1.520.000 300.000 200.000
1.500.000 1.520.000 600.000 600.000
1 1 2 3
1.500.000 1.520.000 300.000 200.000
1.500.000 1.520.000 600.000 600.000
1 2 1 2 1 2
time time time time time time
2
1.020.000
2.040.000
2
1.020.000
2.040.000
x x x x
2 2 3 3
days days days days
4
300.000
1.200.000
4
300.000
1.200.000
6 -
200.000 -
1.200.000 -
6 -
200.000 -
1.200.000 -
x x x x
1 1 1 1
time time time time
x x
2 3
days days
1 1 2 3
2.500.000 620.000 300.000 200.000
2.500.000 620.000 600.000 600.000
1 1 2 3
2.500.000 620.000 300.000 200.000
2.500.000 620.000 600.000 600.000
years years years years
x x x x
1 1 1 1
time time time time
x x
2 3
days days
1 1 2 3
1.500.000 1.095.000 300.000 200.000
1.500.000 1.095.000 600.000 600.000
1 1 2 3
1.500.000 1.095.000 300.000 200.000
1.500.000 1.095.000 600.000 600.000
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
1 2 1 2 1 2 1 2
time time time time time time time time
2
1.500.000
3.000.000
2
1.500.000
3.000.000
2
700.000
1.400.000
2
700.000
1.400.000
4
300.000
1.200.000
4
300.000
1.200.000
6
200.000
1.200.000
6
200.000
1.200.000
x x x x
1 1 1 1
years years years years
x x x x
1 1 1 1
time time time time
x x
2 3
days days
1 1 2 3
1.500.000 1.520.000 300.000 200.000
1.500.000 1.520.000 600.000 600.000
1 1 2 3
1.500.000 1.520.000 300.000 200.000
1.500.000 1.520.000 600.000 600.000
x x x x x
1 1 1 1 1
years years years years years
x x x x x
1 2 1 2 1
time time time time time
2
1.020.000
2.040.000
2
1.020.000
2.040.000
x x x
2 2 3
days days days
4
300.000
1.200.000 -
4
300.000
1.200.000 -
x x
x x x x
4 5
2 2 3 3
days days
days days days days
ORIGINAL CONTRACT NO.
DESCRIPTION
Vol.
Unit Rate [IDR]
Amount [IDR]
1
2
3
4
5
6
d 1
2
1
person
x
1
years
x
2
time
x
3
days
22 kabupaten x 20% = 4 time Transport to District Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
4 4 4 4
time time time time
x x
2 3
Data Management Specialist ( DMS ) to Province Bengkulu : Transport to Bengkulu Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
1 1 1 1
time time time time
1 1 1 1 1 1 1 1
person person person person person person person person
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
1 2 1 2 1 2 1 2
time time time time time time time time
x x x x
2 2 3 3
days days days days
to Province Babel : Transport to Pangkal Pinang Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
1 1 1 1
time time time time
x x
2 3
to Province Lampung Transport to Lampung Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
1 1 1 1
time time time time
x x
to Province Sumatera Selatan Inland Transport Acocomodation OSA
1 1 1
person person person
x x x
1 1 1
years years years
x x x
1 1 1
time time time
22 kabupaten x 20% = 4 time Inland Transport to District Acocomodation OSA
1 1 1
person person person
x x x
1 1 1
years years years
x x x
4 4 4
x x x
1 1 1
years years years
x x x
to Provinsi Jambi : Transport to Jambi Inland Transport Acocomodation OSA
3
4
5
1.2.2 Monitoring Evaluation Provincial Team (PC/QAS) to District and Village (targeted village 2015) 1 Province Bengkulu & Jambi Bengkulu to District and Village Inland Transport 1 person Acocomodation 1 person OSA 1 person 2
Bengkulu To Jambi and District and Village Transport to Jambi Inland Transport Acocomodation Acocomodation OSA OSA
3
4
Province Babel & Lampung Pangkal Pinang to District and Village Inland Transport Acocomodation OSA Pangkal Pinang to Lampung and District and Village
AMENDMENT NO. 6 Unit Rate [IDR]
Vol.
VARIANT
Amount [IDR]
Vol.
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 7 Unit Rate [IDR]
Vol.
Amount [IDR]
6 -
200.000 -
1.200.000 -
6 -
200.000 -
1.200.000 -
days days
4 4 8 12
1.500.000 1.520.000 300.000 200.000
6.000.000 6.080.000 2.400.000 2.400.000 -
4 4 8 12
1.500.000 1.520.000 300.000 200.000
6.000.000 6.080.000 2.400.000 2.400.000 -
days days
1 1 2 3
2.500.000 620.000 300.000 200.000
2.500.000 620.000 600.000 600.000
1 1 2 3
2.500.000 620.000 300.000 200.000
2.500.000 620.000 600.000 600.000
2
1.500.000
3.000.000
2
1.500.000
3.000.000
2
1.095.000
2.190.000
2
1.095.000
2.190.000
4
300.000
1.200.000
4
300.000
1.200.000
6
200.000
1.200.000
6
200.000
1.200.000
days days
1 1 2 3
1.500.000 700.000 300.000 200.000
1.500.000 700.000 600.000 600.000
1 1 2 3
1.500.000 700.000 300.000 200.000
1.500.000 700.000 600.000 600.000
2 3
days days
1 1 2 3
1.500.000 1.520.000 300.000 200.000
1.500.000 1.520.000 600.000 600.000
1 1 2 3
1.500.000 1.520.000 300.000 200.000
1.500.000 1.520.000 600.000 600.000
x x
2 3
days days
1 2 3 -
1.020.000 300.000 200.000 -
1.020.000 600.000 600.000
1 2 3 -
1.020.000 300.000 200.000 -
1.020.000 600.000 600.000
time time time
x x
1 2
days days
4 4 8 -
1.500.000 300.000 200.000 -
6.000.000 1.200.000 1.600.000
4 4 8 -
1.500.000 300.000 200.000 -
6.000.000 1.200.000 1.600.000
10 10 10
time time time
x x
1 2
days days
10 10 20 -
620.000 300.000 200.000 -
6.200.000 3.000.000 4.000.000
10 10 20 -
620.000 300.000 200.000 -
6.200.000 3.000.000 4.000.000
20
300.000
6.000.000
20
300.000
6.000.000
30
200.000
6.000.000
30
200.000
6.000.000
10 10 20
700.000 300.000 200.000
7.000.000 3.000.000 4.000.000
10 10 20
700.000 300.000 200.000
7.000.000 3.000.000 4.000.000
x x
2 3
1 1 1 1 1 1 1 1 1 1
person person person person person person person person person person
x x x x x x x x x x
1 1 1 1 1 1 1 1 1 1
years years years years years years years years years years
x x x x x x x x x x
10 10 10 10 10 10 10 10 10 10
time time time time time time time time time time
x x x x x x
1 4 2 2 5 3
days days days days days days
1 1 1
person person person
x x x
1 1 1
years years years
x x x
10 10 10
time time time
x x
1 2
days days
ORIGINAL CONTRACT NO.
DESCRIPTION
Vol.
Unit Rate [IDR]
Amount [IDR]
1
2
3
4
5
Air Transport Inland Transport Acocomodation Acocomodation OSA OSA
5
Province Sumatera selatan Palembang to District and Village Inland Transport Acocomodation OSA
1 1 1 1 1 1 1 1
person person person person person person person person
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
10 10 10 10 10 10 10 10
time time time time time time time time
x x x x x x
1 4 2 2 5 3
days days days days days days
1 1 1
person person person
x x x
1 1 1
years years years
x x x
10 10 10
time time time
x x
1 2
days days
x x x x x x
1 1 1 1 1 1
years years years years years years
x x x x x x
6 6 6 3 6 3
time time time time time time
x x x x
1 4 2 5
days days days days
x x x x x x
1 1 1 1 1 1
years years years years years years
x x x x x x
6 6 6 3 6 3
time time time time time time
x x x x
1 4 2 5
days days days days
1.2.3 Monitoring Evaluation Provincial Team (PC/QAS and FMS) to Other Province FY 2015 1 Provincial Team Bengkulu & Jambi to Provinsi Jambi : Transport to Jambi 2 person Inland Transport 2 person Acocomodation 2 person Acocomodation 2 person OSA 2 person OSA 2 person 2
Provincial Team Babel & Lampung to Province Lampung Transport to Lampung Inland Transport Acocomodation Acocomodation OSA OSA
2 2 2 2 2 2
person person person person person person
1.2.4 Monitoring Evaluation District Team (DC) to Village (targeted village 2015) District Coordinator Bengkulu 4 district Inland Transport 4 person Acocomodation 4 person OSA 4 person District Coordinator Inland Transport Acocomodation OSA
Jambi
District Coordinator Inland Transport Acocomodation OSA
Babel
District Coordinator Inland Transport
Sumsel
Acocomodation OSA
District Coordinator Inland Transport Acocomodation OSA
Lampung
AMENDMENT NO. 6 Unit Rate [IDR]
Vol.
2
Amount [IDR]
Vol.
Unit Rate [IDR]
AMENDMENT NO. 7
Amount [IDR]
Unit Rate [IDR]
Vol.
Amount [IDR]
10 10
3.480.000 1.520.000
34.800.000 15.200.000
10 10
3.480.000 1.520.000
34.800.000 15.200.000
20
300.000
6.000.000
20
300.000
6.000.000
30
200.000
6.000.000
30
200.000
6.000.000
10 10 20
1.020.000 300.000 200.000
10.200.000 3.000.000 4.000.000
10 10 20
1.020.000 300.000 200.000
10.200.000 3.000.000 4.000.000
12 12
4.480.000 250.000
53.760.000 3.000.000
12 12
4.480.000 250.000
53.760.000 3.000.000
24
300.000
7.200.000
24
300.000
7.200.000
30
200.000
6.000.000
30
200.000
6.000.000
12 12
3.480.000 250.000
41.760.000 3.000.000
12 12
3.480.000 250.000
41.760.000 3.000.000
24
300.000
7.200.000
24
300.000
7.200.000
30
200.000
6.000.000
30
200.000
6.000.000
28 28 28 28
village village village village
x x x x
50% 50% 50% 50%
x x x x
1 1 1 1
years years years years
x x x x
7 7 7 7
time time time time
x x
1 2
days days
28 28 56
250.000 300.000 50.000
7.000.000 8.400.000 2.800.000
28 28 56
250.000 300.000 50.000
7.000.000 8.400.000 2.800.000
4 4 4 4
district person person person
26 26 26 26
village village village village
x x x x
50% 50% 50% 50%
x x x x
1 1 1 1
years years years years
x x x x
7 7 7 7
time time time time
x x
1 2
days days
28 28 56
250.000 300.000 50.000
7.000.000 8.400.000 2.800.000
28 28 56
250.000 300.000 50.000
7.000.000 8.400.000 2.800.000
2 2 2 2
district person person person
16 16 16 16
village village village village
x x x x
50% 50% 50% 50%
x x x x
1 1 1 1
years years years years
x x x x
7 7 7 7
time time time time
x x
1 2
days days
14 14 28
250.000 300.000 50.000
3.500.000 4.200.000 1.400.000
14 14 28
250.000 300.000 50.000
3.500.000 4.200.000 1.400.000
10 10 10 10 10 10 10
district person person person person person person
77 77 77 77 77 77 77
village village village village village village village
x x x x x x x
50% 50% 50% 50% 50% 50% 50%
x x x x x x x
1 1 1 1 1 1 1
years years years years years years years
x x x x x x x
7 7 9 7 9 7 9
time time time time time time time
x x x x
2 2 3 3
days days days days
2 2 2 2
district person person person
16 16 16 16
village village village village
x x x x
50% 50% 50% 50%
x x x x
1 1 1 1
years years years years
x x x x
7 7 7 7
time time time time
x x
1 2
days days
90
250.000
22.500.000
90
250.000
22.500.000
180
300.000
54.000.000
180
300.000
54.000.000
270
50.000
13.500.000
270
50.000
13.500.000
14 14 28
250.000 300.000 50.000
3.500.000 4.200.000 1.400.000
14 14 28
250.000 300.000 50.000
3.500.000 4.200.000 1.400.000
Management Fee 10 % of [1.2] 1.3 1.3.1 1
VARIANT
Coordination Meeting Province to Regional (in Regional) - 4 time From Bengkulu to Palembang Transport to Palembang Acommodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
4 4 4 4
time time time time
From Bangka Belitung to Palembang
1
person
x
1
years
x
4
time
x x
1 2
days days
4 4 8
2.500.000 300.000 200.000
51.957.000
(12.500.000)
39.457.000
436.560.000
(300.000.000)
136.560.000
10.000.000 1.200.000 1.600.000
4 4 8
2.500.000 300.000 200.000
10.000.000 1.200.000 1.600.000
ORIGINAL CONTRACT NO.
DESCRIPTION
Vol.
Unit Rate [IDR]
Amount [IDR]
1
2
3
4
5
1.3.2 1
2
1.3.3
Unit Rate [IDR]
Vol.
VARIANT
Amount [IDR]
Vol.
Unit Rate [IDR]
AMENDMENT NO. 7
Amount [IDR]
Unit Rate [IDR]
Vol.
Amount [IDR]
Transport to Palembang Acommodation OSA
1 1 1
person person person
x x x
1 1 1
years years years
x x x
4 4 4
time time time
x x
1 2
days days
4 4 8
1.500.000 300.000 200.000
6.000.000 1.200.000 1.600.000
4 4 8
1.500.000 300.000 200.000
6.000.000 1.200.000 1.600.000
fullboard meeting di regional (ROMS dan PMS)
7
person
x
1
years
x
4
time
x
1
days
28
350.000
9.800.000
28
350.000
9.800.000
Province Team to Other Province - 4 time From Bengkulu to Jambi Transport to Jambi Acommodation OSA
3 3 3 3
person person person person
x x x x
1 1 1 1
years years years years
x x x x
7 7 7 7
time time time time
x x
4 5
days days
21 84 105
4.480.000 300.000 200.000
94.080.000 25.200.000 21.000.000
21 84 105
4.480.000 300.000 200.000
94.080.000 25.200.000 21.000.000
From Bangka Belitung to Lampung Transport to Lampung Acommodation OSA
3 3 3 3
person person person person
x x x x
1 1 1 1
years years years years
x x x x
7 7 7 7
time time time time
x x
4 5
days days
21 84 105
3.480.000 300.000 200.000
73.080.000 25.200.000 21.000.000
21 84 105
3.480.000 300.000 200.000
73.080.000 25.200.000 21.000.000
District Team (DC and DFMA) to Province (in Province) - 4 time District Team (DC and DFMA) Provincial Bengkulu Transport to Bengkulu Acocomodation OSA
8 8 8 8
person person person person
x x x x
1 1 1 1
years years years years
x x x x
4 4 4 4
time time time time
x x
1 2
days days
32 32 64
250.000 300.000 50.000
8.000.000 9.600.000 3.200.000
32 32 64
250.000 300.000 50.000
8.000.000 9.600.000 3.200.000
District Team (DC and DFMA) Provincial Jambi Transport to Jambi Acocomodation OSA
8 8 8 8
person person person person
x x x x
1 1 1 1
years years years years
x x x x
4 4 4 4
time time time time
x x
1 2
days days
32 32 64
250.000 300.000 50.000
8.000.000 9.600.000 3.200.000
32 32 64
250.000 300.000 50.000
8.000.000 9.600.000 3.200.000
District Team (DC and DFMA) Provincial Babel Transport to Pangkalpinang Acocomodation OSA
4 4 4 4
person person person person
x x x x
1 1 1 1
years years years years
x x x x
4 4 4 4
time time time time
x x
1 2
days days
16 16 32
250.000 300.000 50.000
4.000.000 4.800.000 1.600.000
16 16 32
250.000 300.000 50.000
4.000.000 4.800.000 1.600.000
20 20 20 20
person person person person
x x x x
1 1 1 1
years years years years
x x x x
4 4 4 4
time time time time
x x
1 2
days days
80 80 160
250.000 300.000 50.000
20.000.000 24.000.000 8.000.000
80 80 160
250.000 300.000 50.000
20.000.000 24.000.000 8.000.000
District Team (DC and DFMA) Provincial Lampung Transport to Lampung Acocomodation OSA
4 4 4 4
person person person person
x x x x
1 1 1 1
years years years years
x x x x
4 4 4 4
time time time time
x x
1 2
days days
16 16 32
250.000 300.000 50.000
4.000.000 4.800.000 1.600.000
16 16 32
250.000 300.000 50.000
4.000.000 4.800.000 1.600.000
District Team (DEAO) to Province (in Province) - 2 time District Team (DEAO) Provincial Bengkulu Transport to Bengkulu Acocomodation OSA
4 4 4 4
person person person person
x x x x
1 1 1 1
years years years years
x x x x
2 2 2 2
time time time time
x x
1 2
days days
8 8 16
250.000 300.000 50.000
2.000.000 2.400.000 800.000
8 8 16
250.000 300.000 50.000
2.000.000 2.400.000 800.000
4 4 4 4 4 4 4
person person person person person person person
x x x x x x x
1 1 1 1 1 1 1
years years years years years years years
x x x x x x x
2 2 3 2 3 2 3
time time time time time time time
12
250.000
3.000.000
12
250.000
3.000.000
x x x x
1 1 2 2
days days days days
12
300.000
3.600.000
12
300.000
3.600.000
24
50.000
1.200.000
24
50.000
1.200.000
2 2 2 2
person person person person
x x x x
1 1 1 1
years years years years
x x x x
2 2 2 2
time time time time
x x
1 2
days days
4 4 8
250.000 300.000 50.000
1.000.000 1.200.000 400.000
4 4 8
250.000 300.000 50.000
1.000.000 1.200.000 400.000
10 10 10 10
person person person person
x x x x
1 1 1 1
years years years years
x x x x
2 2 2 2
time time time time
x x
1 2
days days
20 20 40
250.000 300.000 50.000
5.000.000 6.000.000 2.000.000
20 20 40
250.000 300.000 50.000
5.000.000 6.000.000 2.000.000
2 2 2 2
person person person person
x x x x
1 1 1 1
years years years years
x x x x
2 2 2 2
time time time time
x x
1 2
days days
4 4 8
250.000 300.000 50.000
1.000.000 1.200.000 400.000
4 4 8
250.000 300.000 50.000
1.000.000 1.200.000 400.000
District Team (DC and DFMA) Provincial Sumsel Transport to Palembang Acocomodation OSA
1.3.4
AMENDMENT NO. 6
District Team (DEAO) Provincial Jambi Transport to Jambi Acocomodation OSA
District Team (DEAO) Provincial Babel Transport to Pangkalpinang Acocomodation OSA District Team (DEAO) Provincial Sumsel Transport to Palembang Acocomodation OSA District Team (DEAO) Provincial Lampung Transport to Lampung Acocomodation OSA Management Fee 10 % of [1.3]
43.656.000
(30.000.000)
13.656.000
ORIGINAL CONTRACT NO.
DESCRIPTION
Vol.
Unit Rate [IDR]
Amount [IDR]
1
2
3
4
5
1.4 1.4.1
Coordination Meeting For Several Event By Request Regional Team to Province to District/Village to Province Bengkulu : Transport to Bengkulu Transport to Bengkulu Inland Transport Inland Transport Acocomodation Acocomodation OSA OSA
2 4 2 4 2 4 2 4
person person person person person person person person
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
4 4 4 4 4 4 4 4
time time time time time time time time
to Provinsi Jambi : Transport to Jambi Transport to Jambi Inland Transport Inland Transport Acocomodation Acocomodation OSA OSA
2 4 2 4 2 4 2 4
person person person person person person person person
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
4 4 4 4 4 4 4 4
time time time time time time time time
to Province Babel : Transport to Pangkal Pinang Transport to Pangkal Pinang Inland Transport Inland Transport Acocomodation Acocomodation OSA OSA
2 4 2 4 2 4 2 4
person person person person person person person person
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
4 4 4 4 4 4 4 4
time time time time time time time time
to Province Lampung Transport to Lampung Transport to Lampung Inland Transport Inland Transport Acocomodation Acocomodation OSA OSA
2 4 2 4 2 4 2 4
person person person person person person person person
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
4 4 4 4 4 4 4 4
time time time time time time time time
x x x x
4 4 5 5
days days days days
to Province Sumatera Selatan Inland Transport Inland Transport Acocomodation Acocomodation OSA OSA
2 4 2 4 2 4
person person person person person person
x x x x x x
1 1 1 1 1 1
years years years years years years
x x x x x x
4 4 4 4 4 4
time time time time time time
x x x x
4 4 5 5
days days days days
AMENDMENT NO. 6 Vol.
Unit Rate [IDR]
VARIANT
Amount [IDR]
174.560.000
x x x x
x x x x
x x x x
4 4 5 5
4 4 5 5
4 4 5 5
days days days days
days days days days
days days days days
Amount [IDR]
Vol.
Unit Rate [IDR]
(100.000.000)
Amount [IDR]
334.560.000
2.500.000
40.000.000
16
2.500.000
16
620.000
9.920.000
16
620.000
9.920.000
64
300.000
19.200.000
64
300.000
19.200.000
80
200.000
16.000.000
80
200.000
16.000.000
16
1.500.000
24.000.000
16
1.500.000
24.000.000
16
50.000
800.000
16
50.000
800.000
64
300.000
19.200.000
64
300.000
19.200.000
16
1.500.000
24.000.000
16
1.500.000
24.000.000
16
700.000
11.200.000
16
700.000
11.200.000
64
300.000
19.200.000
64
300.000
19.200.000
80
200.000
16.000.000
80
200.000
16.000.000
16
1.500.000
24.000.000
16
1.500.000
24.000.000
16
1.520.000
24.320.000
16
1.520.000
24.320.000
64
300.000
19.200.000
64
300.000
19.200.000
80
200.000
16.000.000
80
200.000
16.000.000
16
1.020.000
16.320.000
16
1.020.000
16.320.000
64
300.000
19.200.000
64
300.000
19.200.000
80
200.000
16.000.000
80
200.000
33.456.000
1.5 National Meeting in Jakarta (by Request) 2015 1 Regional to Jakarta [PM] Air Transport Inland Transport Acocomodation OSA
29.760.000
3
Unit Rate [IDR]
16
Management Fee 10 % of [1.4]
2
Vol.
AMENDMENT NO. 7
(10.000.000)
40.000.000
16.000.000 23.456.000 29.760.000
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
4 4 4 4
time time time time
x x
2 3
days days
4 4 8 12
2.120.000 400.000 300.000 200.000
8.480.000 1.600.000 2.400.000 2.400.000
4 4 8 12
2.120.000 400.000 300.000 200.000
8.480.000 1.600.000 2.400.000 2.400.000
Provincial to Jakarta [PC] Air Transport Inland Transport Acocomodation OSA
1 1 1 1
person person person person
x x x x
1 1 1 1
years years years years
x x x x
4 4 4 4
time time time time
x x
2 3
days days
4 4 8 12
2.120.000 400.000 300.000 200.000
8.480.000 1.600.000 2.400.000 2.400.000
4 4 8 12
2.120.000 400.000 300.000 200.000
8.480.000 1.600.000 2.400.000 2.400.000
District to Jakarta Air Transport Inland Transport Acocomodation OSA
-
person person person person
x x x x
1 1 1 1
years years years years
x x x x
2 2 2 2
time time time time
x x
2 3
days days
Management Fee 10 % of [1.5]
2.976.000
2.976.000
REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) - 2 COMMUNITY BASED WATER SUPPLY PROJECT (PAMSIMAS II) CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
B
REIMBURSABLE COST 1
1.1 1.1.1 a. 1
2
b. 1
2
c. 1
d. 1
DUTY TRAVEL (TARGETEd VILLAGE 2016)
village village village village village village
1 1 1 1 1 1
years years years years years years
x x x x x x
2 5 2 5 2 5
time time time time time time
x x x x
2 2 3 3
day(s) day(s) day(s) day(s)
from Bengkulu to District Bengkulu Selatan and Kaur Inland Transport Accomodation OSA (Fixed)
village village village
1 1 1 1
years years years years
x x x x
2 2 2 5
time time time time
x x x
2 3 3
day(s) day(s) day(s)
Vol.
Unit Rate [IDR]
AMENDMENT NO. 7
Amount [IDR]
Vol.
Unit Rate [IDR]
Amount [IDR]
Remarks 6
1.891.775.000 258.950.000 72.195.000
113.766.667
2.003.141.667
(200.000.000) -
58.950.000 72.195.000
5
485.000
2.425.000
5
485.000
2.425.000
fixed rate
10
300.000
3.000.000
10
300.000
3.000.000
celling rate
15
200.000
3.000.000
15
200.000
3.000.000
fixed rate
2 4 6
620.000 300.000 200.000
1.240.000 1.200.000 1.200.000
2 4 6 -
620.000 300.000 200.000 -
1.240.000 1.200.000 1.200.000 -
fixed rate
4 4 4 4
village village village village village
1 1 1 1 1
years years years years years
x x x x x
2 1 2 2 2
time time time time time
x x
4 5
day(s) day(s)
1 2 8 10
4.480.000 1.095.000 300.000 200.000
4.480.000 2.190.000 2.400.000 2.000.000
1 2 8 10
4.480.000 1.095.000 300.000 200.000
4.480.000 2.190.000 2.400.000 2.000.000
from Bengkulu to District Bungo and Kerinci Air Transport Inland Transport Accomodation OSA (Fixed)
-
village village village village
1 1 1 1
years years years years
x x x x
2 2 2 2
time time time time
x x
4 5
day(s) day(s)
2 2 8 10
4.480.000 940.000 300.000 200.000
8.960.000 1.880.000 2.400.000 2.000.000
2 2 8 10
4.480.000 940.000 300.000 200.000
8.960.000 1.880.000 2.400.000 2.000.000
Provinsi Bangka Belitung (4 siklus disebar ke 1 cluster) 20 desa x 10% = 2 desa from Pangkal Pinang to District Bangka dan Bangka Tengah Inland Transport OSA (Fixed)
-
village village
1 1
years years
x x
4 4
time time
x
2
day(s)
4 8
700.000 200.000
2.800.000 1.600.000
4 8
700.000 200.000
2.800.000 1.600.000
-
village village village village village village village village
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
4 2 4 2 4 2 4 2
time time time time time time time time
2
3.480.000
6.960.000
2
3.480.000
6.960.000
2
1.520.000
3.040.000
2
1.520.000
3.040.000
x x x x
4 4 5 5
day(s) day(s) day(s) day(s)
8
300.000
2.400.000
8
300.000
2.400.000
10
200.000
2.000.000
10
200.000
2.000.000
fixed rate
Provinsi Sumatera Selatan (4 siklus disebar ke 4 cluster) 97 desa x 10% = 10 desa from Palembang to District Ogan Ilir, OKI and MUBA Inland Transport Accomodation OSA (Fixed) -
village village village
1 1 1
years years years
x x x
1 1 1
time time time
x x
5 6
day(s) day(s)
1 5 6
1.450.000 300.000 200.000
1.450.000 1.500.000 1.200.000
1 5 6
1.450.000 300.000 200.000
1.450.000 1.500.000 1.200.000
fixed rate celling rate fixed rate
from Palembang to District OKU , OKUT and OKUS Inland Transport Accomodation OSA (Fixed)
-
village village village
1 1 1
years years years
x x x
1 1 1
time time time
x x
5 6
day(s) day(s)
1 5 6
1.020.000 300.000 200.000
1.020.000 1.500.000 1.200.000
1 5 6
1.020.000 300.000 200.000
1.020.000 1.500.000 1.200.000
fixed rate celling rate fixed rate
from Palembang to District Muara Enim and Lahat Inland Transport Accomodation OSA (Fixed)
-
village village village
1 1 1
years years years
x x x
1 1 1
time time time
x x
5 6
day(s) day(s)
1 5 6
900.000 300.000 200.000
900.000 1.500.000 1.200.000
1 5 6
900.000 300.000 200.000
900.000 1.500.000 1.200.000
fixed rate celling rate fixed rate
Provinsi Lampung (4 siklus disebar ke 1 cluster) 20 desa x 10% = 2 desa from Pangkal Pinang to District Tanggamus and Lampung Selatan Air Transport
OSA (Fixed)
3
4 4 -
VARIANT
Amount [IDR]
Provinsi Jambi (4 siklus disebar ke 2 cluster) 33 desa x 10% = 4 desa from Bengkulu to District Merangin and Sorolangun Air Transport Tranport Inland Transport Accomodation OSA (Fixed)
Accomodation
2
Unit Rate [IDR]
Vol.
-
Spot Checking Spot Checking Provincial Team (PC/QAS) to District to Village (Regular 6 Cycle) Provinsi Bengkulu (4 siklus disebar ke 2 cluster) 35 desa x 10% = 4 desa from Bengkulu to District Kepahiang and Rejang Lebong Inland Transport inlad transport 4 Accomodation accomodation 4 OSA (fixed) OSA (fixed) 4
Inland Transport
e. 1
AMENDMENT NO. 6
Unit Rate Amount [IDR] [IDR] 4 5
CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
4
1.1.2 a. 1
2
from Palembang to District Musi Rawas and Empat Lawang Inland Transport Accomodation OSA (Fixed)
from Bengkulu to District Bengkulu Selatan and Kaur Inland Transport
d. 1
2
3
4
x x x
1 1 1
time time time
x x
5 6
day(s) day(s)
Vol.
VARIANT
Amount [IDR]
Unit Rate [IDR]
Vol.
years years years years years years
x x x x x x
1 2 1 2 1 2
time time time time time time
x x x x
2 2 3 3
day(s) day(s) day(s) day(s)
Amount [IDR]
Vol.
Amount [IDR]
Remarks 6
1 5 6
850.000 300.000 200.000
850.000 1.500.000 1.200.000
1 5 6
49.645.000
1 1 1
AMENDMENT NO. 7 Unit Rate [IDR]
850.000 300.000 200.000
-
850.000 1.500.000 1.200.000
fixed rate celling rate fixed rate
49.645.000
fixed rate
2
485.000
970.000
2
485.000
970.000
4
300.000
1.200.000
4
300.000
1.200.000
celling rate
6
200.000
1.200.000
6
200.000
1.200.000
fixed rate
2
620.000
1.240.000
2
620.000
1.240.000
fixed rate
4
300.000
1.200.000
4
300.000
1.200.000
celling rate
6
200.000
1.200.000
6
200.000
1.200.000
fixed rate
1 1 4 5
4.480.000 1.095.000 300.000 300.000 200.000 200.000
4.480.000 1.095.000 1.200.000 1.000.000
1 1
4.480.000 1.095.000 1.200.000 1.000.000
celling rate fixed rate
5
4.480.000 1.095.000 300.000 200.000
2
4.480.000
8.960.000
2
4.480.000
8.960.000
celling rate
2
940.000
1.880.000
2
940.000
1.880.000
fixed rate
1 1 1
years years years years years years
x x x x x x
1 2 1 2 1 2
time time time time time time
x x x x
2 2 3 3
day(s) day(s) day(s) day(s)
4 4 4 4 4 4
village village village village village village
-
years years years years years years
x x x x x x
1 1 1 1 1 1
time time time time time time
x x x x
4 4 5 5
day(s) day(s) day(s) day(s)
from Bengkulu to District Bungo and Kerinci Air Transport transport Inland Transport Inland Transport Accomodation accomodation OSA (Fixed) OSA (Fixed)
4 4 4 4 4 4 4 4
village village village village village village village village
-
years years years years years years years years
x x x x x x x x
1 2 1 2 1 2 1 2
time time time time time time time time
x x x x
2 4 3 5
day(s) day(s) day(s) day(s)
8
300.000
2.400.000
8
300.000
2.400.000
celling rate
10
200.000
2.000.000
10
200.000
2.000.000
fixed rate
Provinsi Bangka Belitung (2 kabupaten x 2 = 4 desa) from Pangkal Pinang to District Bangka dan Bangka Tengah Inland Transport OSA (Fixed)
4 4 4
village village village
-
years years years
x x x
1 1 1
time time time
x x
2 3
day(s) day(s)
1 2 3
700.000 550.000 200.000
700.000 1.100.000 600.000
1 2 3
700.000 550.000 200.000
700.000 1.100.000 600.000
fixed rate celling rate fixed rate
4 4 4 4 4 4
village village village village village village
-
years years years years years years
x x x x x x
1 1 1 1 1 1
time time time time time time
day(s) day(s) day(s) day(s)
3.480.000 1.520.000 300.000 300.000 200.000 200.000
3.480.000 1.520.000 1.200.000 1.000.000
5
3.480.000 1.520.000 300.000 200.000
3.480.000 1.520.000 1.200.000 1.000.000
celling rate fixed rate
4 4 5 5
1 1 4 5
1 1
x x x x
Provinsi Sumatera Selatan (10 kabupaten x 2 = 20 desa) from Palembang to District Ogan Ilir, OKI and MUBA Inland Transport Accomodation OSA (Fixed)
6 6 6
village village village
-
years years years
x x x
1 1 1
time time time
x x
3 4
day(s) day(s)
1 3 4
1.450.000 300.000 200.000
1.450.000 900.000 800.000
1 3 4
1.450.000 300.000 200.000
1.450.000 900.000 800.000
fixed rate celling rate fixed rate
from Palembang to District OKU , OKUT and OKUS Inland Transport Accomodation OSA (Fixed)
6 6 6
village village village
-
years years years
x x x
1 1 1
time time time
x x
3 4
day(s) day(s)
1 3 4
1.020.000 300.000 200.000
1.020.000 900.000 800.000
1 3 4
1.020.000 300.000 200.000
1.020.000 900.000 800.000
fixed rate celling rate fixed rate
from Palembang to District Muara Enim and Lahat Inland Transport Accomodation OSA (Fixed)
4 4 4
village village village
-
years years years
x x x
1 1 1
time time time
x x
2 3
day(s) day(s)
1 2 3
900.000 300.000 200.000
900.000 600.000 600.000
1 2 3
900.000 300.000 200.000
900.000 600.000 600.000
fixed rate celling rate fixed rate
Provinsi Jambi (4 kabupaten x 2 = 8 desa) from Bengkulu to District Merangin and Sorolangun Air Transport Inland Transport Accomodation
Provinsi Lampung (2 kabupaten x 2 = 4 desa) from Pangkal Pinang to District Tanggamus and Lampung Selatan Air Transport Inland Transport Accomodation OSA (Fixed)
e. 1
years years years
Unit Rate [IDR]
village village village village village village
OSA (Fixed)
c. 1
1 1 1
AMENDMENT NO. 6
4 4 4 4 4 4
OSA (Fixed)
2
village village village
Spot Checking Provincial Team (PC/QAS) to District to Village (Sustainability 1 cycle) Provinsi Bengkulu (4 kabupaten x 2 = 8 desa) from Bengkulu to District Kepahiang and Rejang Lebong Inland Transport 4 village 4 village Accomodation 4 village 4 village OSA (Fixed) 4 village 4 village
Accomodation
b. 1
-
Unit Rate Amount [IDR] [IDR] 4 5
from Palembang to District Musi Rawas and Empat Lawang
-
-
-
-
-
4
4
celling rate fixed rate
celling rate fixed rate
CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
Inland Transport Accomodation OSA (Fixed) 1.1.3 a. 1
2
b. 1
2
c. 1
d. 1
e. 1
2
3
4 4 4
village village village
-
years years years
x x x
1 1 1
time time time
x x
2 3
day(s) day(s)
Spot Checking Provincial Team - Financial Management Specialist (FMS) to District/ Village (regular 6 cycle) Provinsi Bengkulu (4 siklus disebar ke 2 cluster) 35 desa x 10% = 4 desa from Bengkulu to District Kepahiang and Rejang Lebong Inland Transport village 4 village Accomodation village 4 village OSA (fixed) village 4 village
1 1 1 1 1 1
years years years years years years
x x x x x x
2 1 2 1 2 1
time time time time time time
x x x x
2 2 3 3
day(s) day(s) day(s) day(s)
from Bengkulu to District Bengkulu Selatan and Kaur Inland Transport Accomodation OSA (Fixed)
4 4 4
village village village
1 1 1
years years years
x x x
2 2 2
time time time
x x
2 3
Provinsi Jambi (4 siklus disebar ke 2 cluster) 33 desa x 10% = 4 desa from Bengkulu to District Merangin and Sorolangun Air Transport Inland Transport Accomodation OSA (Fixed)
-
village village village village
1 1 1 1
years years years years
x x x x
2 2 2 2
time time time time
x x
4 5
from Bengkulu to District Bungo and Kerinci Air Transport transport Inland Transport Inland Transport Accomodation accomodation OSA (Fixed) OSA (fixed)
4 4 4 4
village village village village village village village village
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
2 1 2 1 2 1 2 1
time time time time time time time time
x x x x
4 2 5 3
day(s) day(s) day(s) day(s)
Provinsi Bangka Belitung (4 siklus disebar ke 1 cluster) 20 desa x 10% = 2 desa from Pangkal Pinang to District Bangka dan Bangka Tengah Inland Transport OSA (Fixed)
4 4
village village
1 1
years years
x x
4 4
time time
x
2
day(s)
Provinsi Lampung (4 siklus disebar ke 1 cluster) 20 desa x 10% = 2 desa from Pangkal Pinang to District Tanggamus and Lampung Selatan Air Transport Air Transport Inland Transport Inland Transport Accomodation Accomodation OSA (Fixed) OSA (Fixed)
-
village village village village village village village village
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
4 4 4 4 4 4 4 4
time time time time time time time time
x x x x
4 4 5 5
day(s) day(s) day(s) day(s)
Provinsi Sumatera Selatan (4 siklus disebar ke 4 cluster) 97 desa x 10% = 10 desa from Palembang to District Ogan Ilir, OKI and MUBA Inland Transport Accomodation OSA (Fixed) -
village village village
1 1 1
years years years
x x x
1 1 1
time time time
x x
5 6
from Palembang to District OKU , OKUT and OKUS Inland Transport Accomodation OSA (Fixed)
-
village village village
1 1 1
years years years
x x x
1 1 1
time time time
x x
from Palembang to District Muara Enim and Lahat Inland Transport Accomodation OSA (Fixed)
-
village village village
1 1 1
years years years
x x x
1 1 1
time time time
x x
Unit Rate Amount [IDR] [IDR] 4 5
AMENDMENT NO. 6 Unit Rate [IDR]
Vol. 1 2 3
850.000 300.000 200.000
VARIANT
Amount [IDR] 850.000 600.000 600.000
Vol.
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 7 Vol. 1 2 3
Unit Rate [IDR] 850.000 300.000 200.000
75.715.000
Amount [IDR] 850.000 600.000 600.000
Remarks 6 fixed rate celling rate fixed rate
75.715.000
1
485.000
485.000
1
485.000
485.000
fixed rate
2
300.000
600.000
2
300.000
600.000
celling rate
3
200.000
600.000
3
200.000
600.000
fixed rate
day(s) day(s)
2 4 6
620.000 300.000 200.000
1.240.000 1.200.000 1.200.000
2 4 6
620.000 300.000 200.000
1.240.000 1.200.000 1.200.000
fixed rate celling rate fixed rate
day(s) day(s)
2 2 8 10
4.480.000 1.095.000 300.000 200.000
8.960.000 2.190.000 2.400.000 2.000.000
2 2 8 10
4.480.000 1.095.000 300.000 200.000
8.960.000 2.190.000 2.400.000 2.000.000
celling rate fixed rate celling rate fixed rate
1
4.480.000
4.480.000
1
4.480.000
4.480.000
celling rate
1
940.000
940.000
1
940.000
940.000
fixed rate
2
300.000
600.000
2
300.000
600.000
celling rate
3
200.000
600.000
3
200.000
600.000
fixed rate
4 8
700.000 200.000
2.800.000 1.600.000
4 8
700.000 200.000
2.800.000 1.600.000
fixed rate fixed rate
4
3.480.000
13.920.000
4
3.480.000
13.920.000
celling rate
4
1.520.000
6.080.000
4
1.520.000
6.080.000
fixed rate
16
300.000
4.800.000
16
300.000
4.800.000
celling rate
20
200.000
4.000.000
20
200.000
4.000.000
fixed rate
day(s) day(s)
1 5 6
1.450.000 300.000 200.000
1.450.000 1.500.000 1.200.000
1 5 6
1.450.000 300.000 200.000
1.450.000 1.500.000 1.200.000
fixed rate celling rate fixed rate
5 6
day(s) day(s)
1 5 6
1.020.000 300.000 200.000
1.020.000 1.500.000 1.200.000
1 5 6
1.020.000 300.000 200.000
1.020.000 1.500.000 1.200.000
fixed rate celling rate fixed rate
5 6
day(s) day(s)
1 5 6
900.000 300.000 200.000
900.000 1.500.000 1.200.000
1 5 6
900.000 300.000 200.000
900.000 1.500.000 1.200.000
fixed rate celling rate fixed rate
CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
4
1.1.4 a. 1
2
b. 1
2
c. 1
d. 1
e. 1
2
3
from Palembang to District Musi Rawas and Empat Lawang Inland Transport Accomodation OSA (Fixed)
-
village village village
1 1 1
years years years
x x x
1 1 1
time time time
x x
5 6
day(s) day(s)
Spot Checking Provincial Team - Financial Management Specialist (FMS) to District / Village (Sustainability 1 Cycle) Provinsi Bengkulu (4 kabupaten x 2 = 8 desa) from Bengkulu to District Kepahiang and Rejang Lebong Inland Transport 4 village inland transport 4 village Accomodation 4 village accomodation 4 village OSA (Fixed) 4 village OSA (fixed) 4 village
years years years years years years
x x x x x x
1 4 1 4 1 4
time time time time time time
x x x x
2 2 3 3
day(s) day(s) day(s) day(s)
from Bengkulu to District Bengkulu Selatan and Kaur Inland Transport Accomodation OSA (Fixed)
4 4 4
village village village
years years years
x x x
1 1 1
time time time
x x
2 3
Provinsi Jambi (4 kabupaten x 2 = 8 desa) from Bengkulu to District Merangin and Sorolangun Air Transport Inland Transport Accomodation Accomodation OSA (Fixed) OSA (Fixed)
4 4 4 4 4 4
village village village village village village
years years years years years years
x x x x x x
1 1 1 1 1 1
time time time time time time
x x x x
4 4 5 5
from Bengkulu to District Bungo and Kerinci Air Transport transport Inland Transport Inland Transport Accomodation Accomodation Accomodation OSA (Fixed) OSA (ficed)
4 4 4 4 4 4 4 4 4
village village village village village village village village village
years years years years years years years years years
x x x x x x x x x
1 2 1 2 1 2 2 1 2
time time time time time time time time time
x x x x x
4 2 4 3 5
day(s) day(s) day(s) day(s) day(s)
Provinsi Bangka Belitung (2 kabupaten x 2 = 4 desa) from Pangkal Pinang to District Bangka dan Bangka Tengah Inland Transport OSA (Fixed)
4 4
village village
years years
x x
1 1
time time
x x
2 3
day(s) day(s)
Provinsi Lampung (2 kabupaten x 2 = 4 desa) from Pangkal Pinang to District Tanggamus and Lampung Selatan Air Transport Inland Transport Accomodation Accomodation OSA (Fixed) OSA (Fixed)
4 4 4 4 4 4
village village village village village village
years years years years years years
x x x x x x
1 1 1 1 1 1
time time time time time time
x x x x
4 4 5 5
day(s) day(s) day(s) day(s)
Provinsi Sumatera Selatan (10 kabupaten x 2 = 20 desa) from Palembang to District Ogan Ilir, OKI and MUBA Inland Transport Accomodation OSA (Fixed)
6 6 6
village village village
years years years
x x x
1 1 1
time time time
x x
3 4
from Palembang to District OKU , OKUT and OKUS Inland Transport Accomodation OSA (Fixed)
6 6 6
village village village
years years years
x x x
1 1 1
time time time
x x
from Palembang to District Muara Enim and Lahat Inland Transport Accomodation OSA (Fixed)
4 4 4
village village village
years years years
x x x
1 1 1
time time time
x x
Unit Rate Amount [IDR] [IDR] 4 5
AMENDMENT NO. 6 Unit Rate [IDR]
Vol.
VARIANT
Amount [IDR]
Unit Rate [IDR]
Vol.
AMENDMENT NO. 7
Amount [IDR]
Vol.
Unit Rate [IDR]
Amount [IDR]
Remarks 6
1 5 6
850.000 300.000 200.000
850.000 1.500.000 1.200.000
1 5 6
50.495.000
850.000 300.000 200.000
-
850.000 1.500.000 1.200.000
fixed rate celling rate fixed rate
50.495.000
4
485.000
1.940.000
4
485.000
1.940.000
fixed rate
8
300.000
2.400.000
8
300.000
2.400.000
celling rate
12
200.000
2.400.000
12
200.000
2.400.000
fixed rate
day(s) day(s)
1 2 3
620.000 300.000 200.000
620.000 600.000 600.000
1 2 3
620.000 300.000 200.000
620.000 600.000 600.000
fixed rate celling rate fixed rate
1 1 4 5
4.480.000 1.095.000 300.000 300.000 200.000 200.000
4.480.000 1.095.000 1.200.000 1.000.000
1 1
5
4.480.000 1.095.000 300.000 200.000
4.480.000 1.095.000 1.200.000 1.000.000
celling rate fixed rate
day(s) day(s) day(s) day(s)
2
4.480.000
8.960.000
2
4.480.000
8.960.000
celling rate
2
940.000
1.880.000
2
940.000
1.880.000
fixed rate
8
300.000
2.400.000
8
300.000
2.400.000
celling rate celling rate
10
200.000
2.000.000
10
200.000
2.000.000
fixed rate
2 3
550.000 200.000
1.100.000 600.000
2 3
550.000 200.000
1.100.000 600.000
fixed rate fixed rate
1 1
3.480.000 1.520.000
3.480.000 1.520.000
1 1
3.480.000 1.520.000
3.480.000 1.520.000
celling rate fixed rate
4
300.000
1.200.000
celling rate
5
200.000
1.000.000
fixed rate
4
-
-
-
celling rate fixed rate
4
300.000
1.200.000
5
200.000
1.000.000
day(s) day(s)
1 3 4
1.450.000 300.000 200.000
1.450.000 900.000 800.000
1 3 4
1.450.000 300.000 200.000
1.450.000 900.000 800.000
fixed rate celling rate fixed rate
3 4
day(s) day(s)
1 3 4
1.020.000 300.000 200.000
1.020.000 900.000 800.000
1 3 4
1.020.000 300.000 200.000
1.020.000 900.000 800.000
fixed rate celling rate fixed rate
2 3
day(s) day(s)
1 2 3
900.000 300.000 200.000
900.000 600.000 600.000
1 2 3
900.000 300.000 200.000
900.000 600.000 600.000
fixed rate celling rate fixed rate
CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
4
1.1.5 a. 1
2
3
4
b. 1
2
3
4
from Palembang to District Musi Rawas and Empat Lawang Inland Transport Accomodation OSA (Fixed) Spot Checking District Team (DC and DFMA) to 50% Village (6 cycle) Bengkulu Province (4 siklus) Kepahiang (10 village) - remote Spot Checking for Regular (6 Phase) Inland Transport 2 person OSA 2 person Spot Checking for Sustainability (1 Phase) Inland Transport 1 person Inland Transport 1 person OSA 1 person Rejang Lebong (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Kaur (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Bengkulu Selatan (10 village) Spot Checking for Regular (6 Phase) Inland Transport Inland Transport OSA OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Jambi Province Merangin (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Sorolangun (5 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Bungo (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Kerinci (8 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport
4 4 4
village village village
years years years
x x x
1 1 1
time time time
x x
2 3
day(s) day(s)
Unit Rate Amount [IDR] [IDR] 4 5
AMENDMENT NO. 6 Unit Rate [IDR]
Vol.
VARIANT
Amount [IDR]
village village
1 1
years years
x x
4 4
time time
x
3
day(s)
1 1 1
village village village
7 7 7
years years years
x x x
1 1 1
time time time
x
1
day(s)
2 2
person person
-
village village
1 1
years years
x x
4 4
time time
x
3
day(s)
1 1
person person
1 1
village village
7 7
years years
x x
1 1
time time
x
1
day(s)
2 2
person person
-
village village
1 1
years years
x x
4 4
time time
x
3
day(s)
1 1
person person
1 1
village village
7 7
years years
x x
1 1
time time
x
1
day(s)
2 2 2 2
person person person person
-
village village village village
1 1 1 1
years years years years
x x x x
4 2 4 2
time time time time
x x
3 3
day(s) day(s)
1 1
person person
1 1
village village
7 7
years years
x x
1 1
time time
x
1
day(s)
2 2
person person
-
village village
1 1
years years
x x
4 4
time time
x
3
day(s)
1 1
person person
1 1
village village
7 7
years years
x x
1 1
time time
x
1
day(s)
2 2
person person
-
village village
1 1
years years
x x
4 4
time time
x
2
day(s)
1 1
person person
1 1
village village
7 7
years years
x x
1 1
time time
x
1
day(s)
2 2
person person
-
village village
1 1
years years
x x
4 4
time time
x
3
day(s)
1 1
person person
1 1
village village
7 7
years years
x x
1 1
time time
x
1
day(s)
2 2
person person
-
village village
1 1
years years
x x
4 4
time time
x
2
day(s)
1
person
1
village
7
years
x
1
time
AMENDMENT NO. 7
Amount [IDR]
Vol.
Unit Rate [IDR]
Amount [IDR]
Remarks 6
1 2 3
850.000 300.000 200.000
850.000 600.000 600.000 10.900.000
-
Vol.
Unit Rate [IDR]
1 2 3
850.000 300.000 200.000
-
850.000 600.000 600.000
fixed rate celling rate fixed rate
10.900.000
fixed rate fixed rate
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
fixed rate fixed rate fixed rate
fixed rate fixed rate 1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
fixed rate fixed rate
fixed rate fixed rate 1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
4
100.000
400.000
4
100.000
400.000
12
50.000
600.000
12
50.000
600.000
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
fixed rate fixed rate
fixed rate fixed rate
fixed rate fixed rate
fixed rate fixed rate 1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
fixed rate fixed rate
fixed rate fixed rate 1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
fixed rate fixed rate
fixed rate fixed rate 1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
fixed rate fixed rate
fixed rate fixed rate 1
100.000
100.000
1
100.000
100.000
fixed rate
CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
c. 1
2
d. 1
2
3
4
5
6
OSA
1
person
1
village
7
years
x
1
time
x
1
day(s)
Bangka Belitung Province Bangka (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA
2 2
person person
-
village village
1 1
years years
x x
4 4
time time
x
3
day(s)
1 1
person person
1 1
village village
7 7
years years
x x
1 1
time time
x
1
day(s)
2 2 2 2
person person person person
-
village village village village
1 1 1 1
years years years years
x x x x
4 1 4 1
time time time time
x x
3 3
1 1
person person
1 1
village village
7 7
years years
x x
1 1
time time
x
2 2 2 2
person person person person
-
village village village village
1 1 1 1
years years years years
x x x x
4 1 4 1
time time time time
1 1
person person
1 1
village village
7 7
years years
x x
1 1
2 2
person person
-
village village
1 1
years years
x x
1 1
person person
1 1
village village
7 7
years years
2 2
person person
-
village village
1 1
1 1
person person
1 1
village village
2 2
person person
-
1 1
person person
2 2 2 2
Bangka Tengah (10 village) Spot Checking for Regular (6 Phase) Inland Transport inland transport OSA OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Sumatera Selatan Province Ogan Ilir (10 village) Spot Checking for Regular (6 Phase) Inland Transport inland transport OSA OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Ogan Komering Ilir (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA OKU Timur (8 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA OKU Selatan (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Muara Enim (9 village) Spot Checking for Regular (6 Phase) Inland Transport inland transport OSA OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Lahat (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA
Unit Rate Amount [IDR] [IDR] 4 5
AMENDMENT NO. 6 Unit Rate [IDR]
Vol. 1
50.000
VARIANT
Amount [IDR] 50.000
Vol.
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 7 Vol. 1
Unit Rate [IDR] 50.000
Amount [IDR] 50.000
Remarks 6 fixed rate
fixed rate fixed rate 1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
2
100.000
200.000
2
100.000
200.000
day(s) day(s)
6
50.000
300.000
6
50.000
300.000
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
2
100.000
200.000
2
100.000
200.000
x x
3 3
day(s) day(s)
6
50.000
300.000
6
50.000
300.000
time time
x
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
4 4
time time
x
3
day(s)
x x
1 1
time time
x
1
day(s)
years years
x x
4 4
time time
x
2
day(s)
7 7
years years
x x
1 1
time time
x
1
day(s)
village village
1 1
years years
x x
4 4
time time
x
3
day(s)
1 1
village village
7 7
years years
x x
1 1
time time
x
1
day(s)
person person person person
-
village village village village
1 1 1 1
years years years years
x x x x
4 3 4 3
time time time time
x x
3 3
1 1
person person
1 1
village village
7 7
years years
x x
1 1
time time
x
2 2
person person
-
village village
1 1
years years
x x
4 4
time time
1 1
person person
1 1
village village
7 7
years years
x x
1 1
time time
fixed rate fixed rate
fixed rate fixed rate
fixed rate fixed rate
fixed rate fixed rate
fixed rate fixed rate
fixed rate fixed rate 1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
fixed rate fixed rate
fixed rate fixed rate 1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
fixed rate fixed rate
fixed rate fixed rate 1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
6
100.000
600.000
6
100.000
600.000
day(s) day(s)
18
50.000
900.000
18
50.000
900.000
1
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
x
3
day(s)
x
1
day(s)
fixed rate fixed rate
fixed rate fixed rate
fixed rate fixed rate
fixed rate fixed rate 1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
fixed rate fixed rate
CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
7
8
9
1
e. 1
2
Musi Rawas (8 village) Spot Checking for Regular (6 Phase) Inland Transport inland transport OSA OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Musi Banyuasin (10 village) Spot Checking for Regular (6 Phase) Inland Transport inland transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Empat Lawang (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Ogan Komering Ulu (10 village) Spot Checking for Regular (6 Phase) Inland Transport inland transport OSA OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Lampung Province Lampung Selatan (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA Tanggamus (10 village) Spot Checking for Regular (6 Phase) Inland Transport OSA Spot Checking for Sustainability (1 Phase) Inland Transport OSA
Unit Rate Amount [IDR] [IDR] 4 5
AMENDMENT NO. 6 Unit Rate [IDR]
Vol.
Amount [IDR]
Vol.
person person person person
-
village village village village
1 1 1 1
years years years years
x x x x
4 3 4 3
time time time time
x x
2 2
1 1
person person
1 1
village village
7 7
years years
x x
1 1
time time
x
1
2 2 2 2 1 1
person person person person person person
1 1
village village village village village village
1 1 1 1 7 7
years years years years years years
x x x x x x
4 3 4 3 1 1
time time time time time time
2 2
person person
-
village village
1 1
years years
x x
4 4
1 1
person person
1 1
village village
7 7
years years
x x
2 2 2 2
person person person person
-
village village village village
1 1 1 1
years years years years
1 1
person person
1 1
village village
7 7
2 2
person person
-
village village
1 1
person person
1 1
2 2
person person
1 1
person person
600.000
6
100.000
600.000
day(s) day(s)
12
50.000
600.000
12
50.000
600.000
day(s)
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
6
100.000
600.000
6
100.000
600.000
18 1 1
100.000 100.000 50.000
1.800.000 100.000 50.000
18 1 1
100.000 100.000 50.000
1.800.000 100.000 50.000
x
1
day(s)
time time
x
3
day(s)
1 1
time time
x
1
day(s)
x x x x
4 1 4 1
time time time time
x x
3 3
day(s) day(s)
years years
x x
1 1
time time
x
1
day(s)
1 1
years years
x x
4 4
time time
x
3
day(s)
village village
7 7
years years
x x
1 1
time time
x
1
day(s)
-
village village
1 1
years years
x x
4 4
time time
x
3
day(s)
1 1
village village
7 7
years years
x x
1 1
time time
x
1
day(s)
fixed rate
Inland Transport Inland Transport
1 1
person person
Acocomodation Acocomodation
1 1
person person
OSA OSA
1 1
person person
time time time time time time time time time time time time
fixed rate fixed rate
fixed rate fixed rate 1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
2
100.000
200.000
2
100.000
200.000
6
50.000
300.000
6
50.000
300.000
1 1
100.000 50.000
100.000 50.000
1 1
100.000 50.000
100.000 50.000
fixed rate fixed rate
fixed rate fixed rate
1 1
100.000 50.000
100.000 50.000
1 1
4 4 4 5 5 5
days days days days days days
100.000 50.000
100.000 50.000
fixed rate fixed rate
fixed rate fixed rate 1 1
2
x x x x x x
fixed rate fixed rate
fixed rate fixed rate
100.000 50.000
100.000 50.000
1 1
26.015.000
1 2 5 1 2 5 1 2 5 4 2 5
fixed rate fixed rate
fixed rate
2.500.000
5.000.000
100.000 50.000
(20.000.000)
1.049.185.000
x x x x x x x x x x x x
Remarks
fixed rate day(s) day(s)
years years years years years years years years years years years years
Amount [IDR]
100.000
3 3
1 1 1 1 1 1 1 1 1 1 1 1
Vol.
6
x x
x x x x x x x x x x x x
Amount [IDR]
fixed rate
2 2 2 2
Monitoring Evaluation Regional Team to Province and District (targeted 2016) From Regional to Province/District/Vilage Project Manager (PM) to Province Bengkulu : Transport to Bengkulu 1 person Transport to Bengkulu 1 person
AMENDMENT NO. 7 Unit Rate [IDR]
6
Management Fee 10 % of [1.1] 1.2 1.2.1 a 1
VARIANT Unit Rate [IDR]
100.000 50.000
fixed rate fixed rate
6.015.000
313.766.667
1.360.551.667
(2) 5
2.500.000 2.500.000
(5.000.000) 12.500.000
5
2.500.000
12.500.000
ceiling rate
2
620.000
1.240.000
(2) 5
620.000 620.000
(1.240.000) 3.100.000
5
620.000
3.100.000
fixed rate
8
300.000
2.400.000
(8) 20
300.000 300.000
(2.400.000) 6.000.000
20
300.000
6.000.000
ceiling rate
10
200.000
2.000.000
(10) 25
200.000 200.000
(2.000.000) 5.000.000
25
200.000
5.000.000
fixed rate
CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
2
3
4
5
b 1
to Provinsi Jambi : Transport to Jambi Transport to Jambi
1 1
person person
x x
Inland Transport Inland Transport
1 1
person person
x x
Acocomodation Acocomodation
1 1
person person
x x
OSA OSA
1 1
person person
x x
to Province Babel : Transport to Pangkal Pinang Transport to Pangkal Pinang
1 1
person person
Inland Transport Inland Transport
1 1
person person
Acocomodation Acocomodation
1 1
person person
OSA OSA
1 1
person person
to Province Lampung Transport to Lampung
1
person
Inland Transport
1
person
Acocomodation
1
person
OSA
1
person
to Province Sumatera Selatan Inland Transport Inland Transport
1 1
person person
Acocomodation Acocomodation
1 1
person person
OSA OSA
1 1
person person
Legal Government Specialist ( LGS ) to Province Bengkulu : Transport to Bengkulu
1
person
Inland Transport
1
person
Acocomodation
1
person
OSA
2
1
person
to Provinsi Jambi : Transport to Jambi Transport to Jambi
1 1
person person
Inland Transport Inland Transport
1 1
person person
Acocomodation Acocomodation
1 1
person person
OSA OSA
1 1
person person
1 1 1 1 1 1 1 1 1 1 1 1
years years years years years years years years years years years years
x x x x x x x x x x x x
1 2 5 1 2 5 1 2 5 1 2 5
time time time time time time time time time time time time
x x x x x x x x x x x x
1 1 1 1 1 1 1 1 1 1 1 1
years years years years years years years years years years years years
x x x x x x x x x x x x
1 2 5 1 2 5 1 2 5 1 2 5
time time time time time time time time time time time time
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
1 4 1 4 1 4 1 4
time time time time time time time time
x x x x
4 4 5 5
days days days days
x x x x x x x x x
1 1 1 1 1 1 1 1 1
years years years years years years years years years
x x x x x x x x x
1 2 5 1 2 5 1 2 5
time time time time time time time time time
x x x x x x
4 4 4 5 5 5
days days days days days days
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
1 4 1 4 1 4 1 4
time time time time time time time time
x x x x x x x x x x x
1 1 1 1 1 1 1 1 1 1 1
years years years years years years years years years years years
x x x x x x x x x x x
1 2 5 1 2 5 1 2 5 1 2
time time time time time time time time time time time
x x x x x x
4 4 4 5 5 5
days days days days days days
Unit Rate Amount [IDR] [IDR] 4 5
AMENDMENT NO. 6 Unit Rate [IDR]
Vol.
x x x x
x x x x x
4 4 4 5 5 5
2 2 3 3
2 2 2 3 3
days days days days days days
days days days days
days days days days days
Amount [IDR]
Vol.
AMENDMENT NO. 7
Amount [IDR]
Vol.
Unit Rate [IDR]
Amount [IDR]
Remarks 6
2
1.500.000
3.000.000
(2) 5
1.500.000 1.500.000
(3.000.000) 7.500.000
5
1.500.000
7.500.000
ceiling rate
2
1.095.000
2.190.000
(2) 5
1.095.000 1.095.000
(2.190.000) 5.475.000
5
1.095.000
5.475.000
fixed rate
8
300.000
2.400.000
(8) 20
300.000 300.000
(2.400.000) 6.000.000
20
300.000
6.000.000
ceiling rate
10
200.000
2.000.000
(10) 25
200.000 200.000
(2.000.000) 5.000.000
25 -
200.000 -
5.000.000 -
fixed rate
(2) 5
1.500.000 1.500.000
(3.000.000) 7.500.000
5
1.500.000
7.500.000
ceiling rate
2
x x x x x x
VARIANT Unit Rate [IDR]
1.500.000
3.000.000
2
700.000
1.400.000
(2) 5
700.000 700.000
(1.400.000) 3.500.000
5
700.000
3.500.000
fixed rate
8
300.000
2.400.000
(8) 20
300.000 300.000
(2.400.000) 6.000.000
20
300.000
6.000.000
ceiling rate
10
200.000
2.000.000
(10) 25
200.000 200.000
(2.000.000) 5.000.000
25
200.000
5.000.000
fixed rate
(1) 4 (1) 4 (4) 16 (5) 20
1.500.000 1.500.000 1.520.000 1.520.000 300.000 300.000 200.000 200.000
(1.500.000) 6.000.000 (1.520.000) 6.080.000 (1.200.000) 4.800.000 (1.000.000) 4.000.000
4
1.500.000
6.000.000
ceiling rate
4
1.520.000
6.080.000
fixed rate
16
300.000
4.800.000
ceiling rate
20
200.000
4.000.000
fixed rate
1
1.500.000
1.500.000
1
1.520.000
1.520.000
4
300.000
1.200.000
5
200.000
1.000.000
2
1.020.000
2.040.000
(2) 5
1.020.000 1.020.000
(2.040.000) 5.100.000
5
1.020.000
5.100.000
fixed rate
8
300.000
2.400.000
(8) 20
300.000 300.000
(2.400.000) 6.000.000
20
300.000
6.000.000
ceiling rate
10
200.000
2.000.000
(10) 25
200.000 200.000
(2.000.000) 5.000.000
25
200.000
5.000.000
fixed rate
(1) 4 (1) 4 (2) 8 (3) 12
2.500.000 2.500.000 620.000 620.000 300.000 300.000 200.000 200.000
(2.500.000) 10.000.000 (620.000) 2.480.000 (600.000) 2.400.000 (600.000) 2.400.000
4
2.500.000
10.000.000
ceiling rate
4
620.000
2.480.000
fixed rate
8
300.000
2.400.000
ceiling rate
12
200.000
2.400.000
fixed rate
1
2.500.000
2.500.000
1
620.000
620.000
2
300.000
600.000
3
200.000
600.000
2
1.020.000
2.040.000
(2) 5
1.020.000 1.020.000
(2.040.000) 5.100.000
5
1.020.000
5.100.000
ceiling rate
2
1.095.000
2.190.000
(2) 5
1.095.000 1.095.000
(2.190.000) 5.475.000
5
1.095.000
5.475.000
fixed rate
4
300.000
1.200.000
(4) 10
300.000 300.000
(1.200.000) 3.000.000
10
300.000
3.000.000
ceiling rate
6
200.000
1.200.000
(6)
200.000
(1.200.000)
CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
3
4
5
c 1
to Province Babel : Transport to Pangkal Pinang Transport to Pangkal Pinang
1 1
person person
Inland Transport Inland Transport
1 1
person person
Acocomodation Acocomodation
1 1
person person
OSA OSA
1 1
person person
to Province Lampung Transport to Lampung
1
person
Acocomodation
1
person
OSA
1
person
to Province Sumatera Selatan Inland Transport Inland Transport
1 1
person person
Acocomodation Acocomodation
1 1
person person
OSA OSA
1 1
person person
Training Coordinator ( TC ) to Province Bengkulu : Transport to Bengkulu
1
person
Inland Transport
1
person
OSA
1
person person
1
person
Inland Transport
1
person
OSA
1 1
person person
to Province Babel : Transport to Pangkal Pinang
1
person
Inland Transport
1
person
Acocomodation OSA
4
1
to Provinsi Jambi : Transport to Jambi
Acocomodation
3
person
Inland Transport
Acocomodation
2
1
to Province Lampung
1 1
person person
x
1
years
x
5
time
x
x x x x x x x x x x x x
1 1 1 1 1 1 1 1 1 1 1 1
years years years years years years years years years years years years
x x x x x x x x x x x x
1 2 5 1 2 5 1 2 5 1 2 5
time time time time time time time time time time time time
x x x x x x x x x x x x
1 1 1 1 1 1 1 1 1 1 1 1
years years years years years years years years years years years years
x x x x x x x x x x x x
1 2 5 1 2 5 1 2 5 1 2 5
time time time time time time time time time time time time
x x x x x x
2 2 2 3 3 3
days days days days days days
x x x x x x x x x
1 1 1 1 1 1 1 1 1
years years years years years years years years years
x x x x x x x x x
1 2 5 1 2 5 1 2 5
time time time time time time time time time
x x x x x x
2 2 2 3 3 3
days days days days days days
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
1 4 1 4 1 4 1 4
time time time time time time time time
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
1 4 1 4 1 4 1 4
time time time time time time time time
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
1 4 1 4 1 4 1 4
time time time time time time time time
x x x x x x
3
2 2 2 3 3 3
Unit Rate Amount [IDR] [IDR] 4 5
AMENDMENT NO. 6 Unit Rate [IDR]
Vol.
days days days days days days
x x x x
x x x x
2 2 3 3
2 2 3 3
days days days days
days days days days
days days days days
Vol. 15
200.000
AMENDMENT NO. 7
Amount [IDR]
Vol.
Unit Rate [IDR]
Amount [IDR]
Remarks
3.000.000
15
200.000
3.000.000
6 fixed rate
2
1.020.000
2.040.000
(2) 5
1.020.000 1.020.000
(2.040.000) 5.100.000
5
1.020.000
5.100.000
ceiling rate
2
700.000
1.400.000
(2) 5
700.000 700.000
(1.400.000) 3.500.000
5
700.000
3.500.000
fixed rate
4
300.000
1.200.000
(4) 10
300.000 300.000
(1.200.000) 3.000.000
10
300.000
3.000.000
ceiling rate
6
200.000
1.200.000
(6) 15
200.000 200.000
(1.200.000) 3.000.000
15
200.000
3.000.000
fixed rate
(1) 5
1.500.000 1.500.000
(1.500.000) 7.500.000
5
1.500.000
7.500.000
ceiling rate
1.500.000
1.500.000
1
1.520.000
1.520.000
(1) 5
1.520.000 1.520.000
(1.520.000) 7.600.000
5
1.520.000
7.600.000
fixed rate
2
300.000
600.000
(2) 10
300.000 300.000
(600.000) 3.000.000
10
300.000
3.000.000
ceiling rate
3
200.000
600.000
(3) 15
200.000 200.000
(600.000) 3.000.000
15
200.000
3.000.000
fixed rate
(2) 5
1.020.000 1.020.000
(2.040.000) 5.100.000
5
1.020.000
5.100.000
fixed rate
2
2 2 3 3
Amount [IDR]
days
1
x x x x
VARIANT Unit Rate [IDR]
1.020.000
2.040.000
4
1.020.000
4.080.000
(4) 10
1.020.000 1.020.000
(4.080.000) 10.200.000
10
1.020.000
10.200.000
ceiling rate
6
1.020.000
6.120.000
(6) 15
1.020.000 1.020.000
(6.120.000) 15.300.000
15
1.020.000
15.300.000
fixed rate
(1) 4 (1) 4 (2) 8 (3) 12
2.500.000 2.500.000 620.000 620.000 300.000 300.000 200.000 200.000
(2.500.000) 10.000.000 (620.000) 2.480.000 (600.000) 2.400.000 (600.000) 2.400.000
4
2.500.000
10.000.000
ceiling rate
4
620.000
2.480.000
fixed rate
8
300.000
2.400.000
ceiling rate
12
200.000
2.400.000
fixed rate
(1) 4 (1) 4 (2) 8 (3) 12
1.500.000 1.500.000 1.095.000 1.095.000 300.000 300.000 200.000 200.000
(1.500.000) 6.000.000 (1.095.000) 4.380.000 (600.000) 2.400.000 (600.000) 2.400.000
4
1.500.000
6.000.000
ceiling rate
4
1.095.000
4.380.000
fixed rate
8
300.000
2.400.000
ceiling rate
12
200.000
2.400.000
fixed rate
(1) 4 (1) 4 (2) 8 (3) 12
1.500.000 1.500.000 700.000 700.000 300.000 300.000 200.000 200.000
(1.500.000) 6.000.000 (700.000) 2.800.000 (600.000) 2.400.000 (600.000) 2.400.000
4
1.500.000
6.000.000
fixed rate
4
700.000
2.800.000
fixed rate
8
300.000
2.400.000
ceiling rate
12
200.000
2.400.000
fixed rate
1
2.500.000
2.500.000
1
620.000
620.000
2 3
300.000 200.000
600.000 600.000
1
1.500.000
1.500.000
1
1.095.000
1.095.000
2 3
300.000 200.000
600.000 600.000
1
1.500.000
1.500.000
1
700.000
700.000
2 3
300.000 200.000
600.000 600.000
CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
Transport to Lampung
5
1
person
Acocomodation
1
person
OSA
1
person
to Province Sumatera Selatan Inland Transport
1
person
Acocomodation
1
person
1
person
1
person
person
Inland Transport
1
person
1 1
person person
to Provinsi Jambi : Transport to Jambi
1
person
Inland Transport
1
person
OSA
1 1
person person
to Province Babel : Transport to Pangkal Pinang
1
person
Inland Transport
1
person
Acocomodation OSA
1 1
person person
to Province Lampung Transport to Lampung
1
person
Inland Transport
1
person
Acocomodation OSA
5
person
1
Acocomodation
4
1
Data Management Specialist ( DMS ) to Province Bengkulu : Transport to Bengkulu
OSA
3
person
Acocomodation
Acocomodation
2
1
22 kabupaten x 20% = 4 time Transport to District Inland Transport
OSA
d 1
person
Inland Transport
OSA
6
1
1 1
person person
to Province Sumatera Selatan Inland Transport
1
person
Acocomodation
1
person
OSA
1
person
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
1 4 1 4 1 4 1 4
time time time time time time time time
x x x x
2 2 3 3
days days days days
x x x x x x
1 1 1 1 1 1
years years years years years years
x x x x x x
1 4 1 4 1 4
time time time time time time
x x x x
2 2 3 3
days days days days
x x x x x x
1 1 1 1 1 1
years years years years years years
x x x x x x
2 5 2 5 2 5
time time time time time time
x x x x
2 2 3 3
days days days days
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
1 4 1 4 1 4 1 4
time time time time time time time time
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
1 4 1 4 1 4 1 4
time time time time time time time time
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
1 4 1 4 1 4 1 4
time time time time time time time time
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
1 4 1 4 1 4 1 4
time time time time time time time time
x x x x x
1 1 1 1 1
years years years years years
x x x x x
1 4 1 4 1
time time time time time
Unit Rate Amount [IDR] [IDR] 4 5
AMENDMENT NO. 6 Unit Rate [IDR]
Vol.
x x x x
x x x x
x x x x
x x x
2 2 3 3
2 2 3 3
2 2 3 3
2 2 3 3
2 2 3
days days days days
days days days days
days days days days
days days days days
days days days
Amount [IDR]
Vol.
AMENDMENT NO. 7
Amount [IDR]
Vol.
Unit Rate [IDR]
Amount [IDR]
Remarks 6
1
x x x x
VARIANT Unit Rate [IDR]
1.500.000
1.500.000
1
1.520.000
1.520.000
2
300.000
600.000
3
200.000
600.000
1
1.020.000
1.020.000
2
300.000
600.000
3
200.000
600.000
2
1.520.000
3.040.000
4
300.000
1.200.000
6
200.000
1.200.000
1
2.500.000
2.500.000
1
620.000
620.000
2 3
300.000 200.000
600.000 600.000
1
1.500.000
1.500.000
1
1.095.000
1.095.000
2 3
300.000 200.000
600.000 600.000
1
1.500.000
1.500.000
1
700.000
700.000
2 3
300.000 200.000
600.000 600.000
1
1.500.000
1.500.000
1
1.520.000
1.520.000
2 3
300.000 200.000
600.000 600.000
1
1.020.000
1.020.000
2
300.000
600.000
3
200.000
600.000
(1) 4 (1) 4 (2) 8 (3) 12
1.500.000 1.500.000 1.520.000 1.520.000 300.000 300.000 200.000 200.000
(1.500.000) 6.000.000 (1.520.000) 6.080.000 (600.000) 2.400.000 (600.000) 2.400.000
(1) 4 (2) 8 (3) 12
1.020.000 1.020.000 300.000 300.000 200.000 200.000
(1.020.000) 4.080.000 (600.000) 2.400.000 (600.000) 2.400.000
(2) 5 (4) 10 6 15
1.520.000 1.520.000 300.000 300.000 200.000 200.000
(3.040.000) 7.600.000 (1.200.000) 3.000.000 1.200.000 3.000.000
(1) 4 (1) 4 (2) 8 (3) 12
2.500.000 2.500.000 620.000 620.000 300.000 300.000 200.000 200.000
(2.500.000) 10.000.000 (620.000) 2.480.000 (600.000) 2.400.000 (600.000) 2.400.000
(1) 4 (1) 4 (2) 8 (3) 12
1.500.000 1.500.000 1.095.000 1.095.000 300.000 300.000 200.000 200.000
(1.500.000) 6.000.000 (1.095.000) 4.380.000 (600.000) 2.400.000 (600.000) 2.400.000
(1) 4 (1) 4 (2) 8 (3) 12
1.500.000 1.500.000 700.000 700.000 300.000 300.000 200.000 200.000
(1.500.000) 6.000.000 (700.000) 2.800.000 (600.000) 2.400.000 (600.000) 2.400.000
(1) 4 (1) 4 (2) 8 (3) 12
1.500.000 1.500.000 1.520.000 1.520.000 300.000 300.000 200.000 200.000
(1.500.000) 6.000.000 (1.520.000) 6.080.000 (600.000) 2.400.000 (600.000) 2.400.000
(1) 4 (2) 8 (3)
1.020.000 1.020.000 300.000 300.000 200.000
(1.020.000) 4.080.000 (600.000) 2.400.000 (600.000)
4
1.500.000
6.000.000
ceiling rate
4
1.520.000
6.080.000
fixed rate
8
300.000
2.400.000
ceiling rate
12
200.000
2.400.000
fixed rate
4
1.020.000
4.080.000
fixed rate
8
300.000
2.400.000
ceiling rate
12
200.000
2.400.000
ceiling rate
5
1.520.000
7.600.000
fixed rate
10
300.000
3.000.000
ceiling rate
15
200.000
3.000.000
fixed rate
4
2.500.000
10.000.000
ceiling rate
4
620.000
2.480.000
fixed rate
8
300.000
2.400.000
ceiling rate
12
200.000
2.400.000
fixed rate
4
1.500.000
6.000.000
ceiling rate
4
1.095.000
4.380.000
fixed rate
8
300.000
2.400.000
ceiling rate
12
200.000
2.400.000
fixed rate
4
1.500.000
6.000.000
ceiling rate
4
700.000
2.800.000
fixed rate
8
300.000
2.400.000
ceiling rate
12
200.000
2.400.000
fixed rate
4
1.500.000
6.000.000
ceiling rate
4
1.520.000
6.080.000
fixed rate
8
300.000
2.400.000
ceiling rate
12
200.000
2.400.000
fixed rate
4
1.020.000
4.080.000
fixed rate
8
300.000
2.400.000
ceiling rate
CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
6
22 kabupaten x 20% = 4 time Transport to District Inland Transport
1
person
Acocomodation
1
person
OSA
1
person
1.2.2 Monitoring Evaluation Provincial Team (PC/QAS) to District and Village (targeted 2016) 1 Province Bengkulu & Jambi a Bengkulu to District and Village Inland Transport 1 person Acocomodation OSA
b
2 a
b
3
1 1
person person
time
x
3
days
x x x x x x
1 1 1 1 1 1
years years years years years years
x x x x x x
2 5 2 5 2 5
time time time time time time
2
1.500.000
3.000.000
x x x x
2 2 3 3
days days days days
4
300.000
1.200.000
x x x x x x
1 1 1 1 1 1
years years years years years years
x x x x x x
6 7 6 7 6 7
time time time time time time
6
620.000
3.720.000
x x x x
4 4 5 5
days days days days
24
300.000
7.200.000
years years years years years years years years
x x x x x x x x
6 7 6 7 6 7 6 7
time time time time time time time time
x x x x
4 4 5 5
days days days days
Province Babel & Lampung Pangkal Pinang to District and Village Inland Transport Inland Transport Acocomodation Acocomodation OSA OSA
1 1 1 1 1 1
person person person person person person
x x x x x x
1 1 1 1 1 1
years years years years years years
x x x x x x
6 7 6 7 6 7
time time time time time time
x x x x
4 4 5 5
days days days days
Pangkal Pinang to Lampung and District and Village Air Transport transport Inland Transport Inland Transport Acocomodation Acocomodation OSA OSA
1 1 1 1 1 1 1 1
person person person person person person person person
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
6 7 6 7 6 7 6 7
time time time time time time time time
x x x x
4 4 5 5
days days days days
Province Sumatera selatan Palembang to District and Village Inland Transport Inland Transport Acocomodation Acocomodation OSA OSA
1 1 1 1 1 1
person person person person person person
x x x x x x
1 1 1 1 1 1
years years years years years years
x x x x x x
6 7 6 7 6 7
time time time time time time
x x x x
4 4 5 5
days days days days
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
4 7 4 7 4 7 4 7
time time time time time time time time
2
person
OSA
2
4
1 1 1 1 1 1 1 1
Acocomodation
Provincial Team Babel & Lampung to Province Lampung
2
person
Amount [IDR]
x
x x x x x x x x
person
Vol.
VARIANT
years
person person person person person person person person
2
Unit Rate [IDR]
1
1 1 1 1 1 1 1 1
Inland Transport
AMENDMENT NO. 6
x
Bengkulu To Jambi and District and Village Transport to Jambi Transport to Jambi Inland Transport Inland Transport Acocomodation Acocomodation OSA OSA
1.2.3 Monitoring Evaluation Provincial Team (PC/QAS and FMS) to Other Province (targeted 2016) 1 Provincial Team Bengkulu & Jambi to Provinsi Jambi : Transport to Jambi 2 person
Unit Rate Amount [IDR] [IDR] 4 5
x x x x
1 1 2 2
days days days days
Vol. 12
6
30
200.000
200.000
1.200.000
6.000.000
7
4.480.000
31.360.000
Unit Rate [IDR] 200.000
AMENDMENT NO. 7
Amount [IDR] 2.400.000
(2) 5 (4) 10 (6) 15
1.500.000 1.500.000 300.000 300.000 200.000 200.000
(3.000.000) 7.500.000 (1.200.000) 3.000.000 (1.200.000) 3.000.000
(6) 7 (24) 28 (30) 35
620.000 620.000 300.000 300.000 200.000 200.000
(3.720.000) 4.340.000 (7.200.000) 8.400.000 (6.000.000) 7.000.000
Vol.
Unit Rate [IDR]
Amount [IDR]
12
200.000
2.400.000
Remarks 6 fixed rate
5
1.500.000
7.500.000
fixed rate
10
300.000
3.000.000
ceiling rate
15
200.000
3.000.000
fixed rate
7
620.000
4.340.000
fixed rate
28
300.000
8.400.000
ceiling rate
35
200.000
7.000.000
fixed rate
7
4.480.000
31.360.000
ceiling rate
7
1.095.000
7.665.000
7
1.095.000
7.665.000
fixed rate
28
300.000
8.400.000
28
300.000
8.400.000
ceiling rate
35
200.000
7.000.000
35
200.000
7.000.000
fixed rate
7
700.000
4.900.000
7
700.000
4.900.000
fixed rate
28
300.000
8.400.000
28
300.000
8.400.000
ceiling rate
35
200.000
7.000.000
35
200.000
7.000.000
fixed rate
7
3.480.000
24.360.000
7
3.480.000
24.360.000
ceiling rate
7
1.520.000
10.640.000
7
1.520.000
10.640.000
fixed rate
28
300.000
8.400.000
28
300.000
8.400.000
ceiling rate
35
200.000
7.000.000
35
200.000
7.000.000
fixed rate
7
1.020.000
7.140.000
7
1.020.000
7.140.000
fixed rate
28
300.000
8.400.000
28
300.000
8.400.000
ceiling rate
35
200.000
7.000.000
35
200.000
7.000.000
fixed rate
8
4.480.000
35.840.000
7
4.480.000
31.360.000
ceiling rate
8
250.000
2.000.000
7
250.000
1.750.000
fixed rate
8
300.000
2.400.000
7
300.000
2.100.000
ceiling rate
14
200.000
2.800.000
fixed rate
16
200.000
3.200.000
(8) 7 (8) 7 (8) 7 (16) 14
4.480.000 4.480.000 250.000 250.000 300.000 300.000 200.000 200.000
(35.840.000) 31.360.000 (2.000.000) 1.750.000 (2.400.000) 2.100.000 (3.200.000) 2.800.000
CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
Transport to Lampung
2
Inland Transport
2
person
Acocomodation
2
person
OSA
2
person
1.2.4 Monitoring Evaluation District Team (DC and DFMA) to Village 1 District Coordinator Bengkulu 4 4 Inland Transport 4 4 Acocomodation 4 4 OSA 4 4 2
District Coordinator
Jambi
Inland Transport Acocomodation OSA
3
District Coordinator
Babel
Inland Transport Acocomodation OSA
4
District Coordinator District Coordinator
Sumsel
Inland Transport Inland Transport Acocomodation Acocomodation OSA OSA
5
person
District Coordinator
Lampung
Inland Transport Acocomodation OSA
1.2.5 Pendampingan Pembentukan PAKEM dan DPMU 1 Pangkal Pinang - Belitung transport inland transport accomodation OSA 2 Pangkal Pinang - Belitung Timur transport inland transport accomodation OSA 3 Pangkal Pinang - Bangka Barat
(targeted 2016) district 28 village district 28 village person 28 village person 28 village person 28 village person 28 village person 28 village person 28 village
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
4 7 4 7 4 7 4 7
time time time time time time time time
x x x x
1 1 2 2
days days days days
Unit Rate Amount [IDR] [IDR] 4 5
AMENDMENT NO. 6 Unit Rate [IDR]
Vol.
50% 50% 50% 50% 50% 50% 50% 50%
x x x x x x x x
0,7 0,9 0,7 0,9 0,7 0,9 0,7 0,9
years years years years years years years years
x x x x x x x x
5 5 5 5 5 5 5 5
time time time time time time time time
x x x x
1 1 2 2
days days days days
4 4 4 4 4 4 4 4
district district person person person person person person
26 26 26 26 26 26 26 26
village village village village village village village village
x x x x x x x x
50% 50% 50% 50% 50% 50% 50% 50%
x x x x x x x x
0,7 0,9 0,7 0,9 0,7 0,9 0,7 0,9
years years years years years years years years
x x x x x x x x
5 5 5 5 5 5 5 5
time time time time time time time time
x x x x
1 1 2 2
days days days days
2 2 2 2 2 2 2 2
district district person person person person person person
16 16 16 16 16 16 16 16
village village village village village village village village
x x x x x x x x
50% 50% 50% 50% 50% 50% 50% 50%
x x x x x x x x
0,7 0,9 0,7 0,9 0,7 0,9 0,7 0,9
years years years years years years years years
x x x x x x x x
5 5 5 5 5 5 5 5
time time time time time time time time
x x x x
1 1 2 2
days days days days
10 10 10 10 10 10 10 10 10 10 10 10
district district district person person person person person person person person person
77 77 77 77 77 77 77 77 77 77 77 77
village village village village village village village village village village village village
x x x x x x x x x x x x
50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50% 50%
x x x x x x x x x x x x
0,7 0,7 0,9 0,7 0,7 0,9 0,7 0,7 0,9 0,7 0,7 0,9
years years years years years years years years years years years years
x x x x x x x x x x x x
5 7 7 5 7 7 5 7 7 5 7 7
time time time time time time time time time time time time
x x x x x x
2 2 2 3 3 3
days days days days days days
2 2 2 2 2 2 2 2
district district person person person person person person
16 16 16 16 16 16 16 16
village village village village village village village village
x x x x x x x x
50% 50% 50% 50% 50% 50% 50% 50%
x x x x x x x x
0,7 0,9 0,7 0,9 0,7 0,9 0,7 0,9
years years years years years years years years
x x x x x x x x
5 5 5 5 5 5 5 5
time time time time time time time time
x x x x
1 1 2 2
days days days days
Amount [IDR]
Vol.
AMENDMENT NO. 7
Amount [IDR]
Vol.
Unit Rate [IDR]
Amount [IDR]
Remarks 6
8
x x x x x x x x
VARIANT Unit Rate [IDR]
3.480.000
27.840.000
8
250.000
2.000.000
8
300.000
2.400.000
16
200.000
3.200.000
14
250.000
3.500.000
14
300.000
4.200.000
28
50.000
1.400.000
14
250.000
3.500.000
14
300.000
4.200.000
28
50.000
1.400.000
7
250.000
1.750.000
7
300.000
2.100.000
14
50.000
700.000
(8) 7 (8) 7 (8) 7 (16) 14
3.480.000 3.480.000 250.000 250.000 300.000 300.000 200.000 200.000
(27.840.000) 24.360.000 (2.000.000) 1.750.000 (2.400.000) 2.100.000 (3.200.000) 2.800.000
(14) 18 (14) 18 (28) 37
250.000 250.000 300.000 300.000 50.000 50.000
(3.500.000) 4.583.333 (4.200.000) 5.500.000 (1.400.000) 1.833.333
(14) 18 (14) 18 (28) 37
250.000 250.000 300.000 300.000 50.000 50.000
(3.500.000) 4.583.333 (4.200.000) 5.500.000 (1.400.000) 1.833.333
(7) 9 (7) 9 (14) 18
250.000 250.000 300.000 300.000 50.000 50.000
(1.750.000) 2.291.667 (2.100.000) 2.750.000 (700.000) 916.667
7
3.480.000
24.360.000
ceiling rate
7
250.000
1.750.000
fixed rate
7
300.000
2.100.000
ceiling rate
14
200.000
2.800.000
fixed rate
18
250.000
4.583.333
fixed rate
18
300.000
5.500.000
ceiling rate
37
50.000
1.833.333
fixed rate
18
250.000
4.583.333
fixed rate
18
300.000
5.500.000
ceiling rate
37
50.000
1.833.333
fixed rate
9
250.000
2.291.667
fixed rate
9
300.000
2.750.000
ceiling rate
18
50.000
916.667
fixed rate
49
250.000
12.250.000
(49) 64
250.000 250.000
(12.250.000) 16.041.667
64
250.000
16.041.667
fixed rate
98
300.000
29.400.000
(98) 128
300.000 300.000
(29.400.000) 38.500.000
128
300.000
38.500.000
ceiling rate
147
50.000
7.350.000
(147) 193
50.000 50.000
(7.350.000) 9.625.000
193
50.000
9.625.000
fixed rate
(7) 9 (7) 9 (14) 18
250.000 250.000 300.000 300.000 50.000 50.000
(1.750.000) 2.291.667 (2.100.000) 2.750.000 (700.000) 916.667
9
250.000
2.291.667
fixed rate ceiling rate
7
250.000
1.750.000
7
300.000
2.100.000
14
50.000
700.000
9
300.000
2.750.000
18
50.000
916.667
fixed rate
1 1 1 1
personx personx personx personx
1 1 4 5
trip trip days days
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
fixed fixed fixed fixed
rate rate rate rate
1 1 1 1
personx personx personx personx
1 1 4 5
trip trip days days
1 1 4 5
1.400.000 1.520.000 300.000 200.000
1.400.000 1.520.000 1.200.000 1.000.000
1 1 4 5
1.400.000 1.520.000 300.000 200.000
1.400.000 1.520.000 1.200.000 1.000.000
fixed fixed fixed fixed
rate rate rate rate
CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
Unit Rate Amount [IDR] [IDR] 4 5
AMENDMENT NO. 6 Unit Rate [IDR]
Vol.
VARIANT
Amount [IDR]
Vol.
Unit Rate [IDR]
Amount [IDR]
AMENDMENT NO. 7 Vol.
Unit Rate [IDR]
Amount [IDR]
Remarks
1 1 1 1
personx personx personx personx
1 1 4 5
trip trip days days
1 1 4 5
1.000.000 1.020.000 300.000 200.000
1.000.000 1.020.000 1.200.000 1.000.000
1 1 4 5
1.000.000 1.020.000 300.000 200.000
1.000.000 1.020.000 1.200.000 1.000.000
6 fixed rate fixed rate fixed rate fixed rate
4 Pangkal Pinang - Bangka Selatan transport inland transport accomodation OSA
1 1 1 1
personx personx personx personx
1 1 4 5
trip trip days days
1 1 4 5
1.000.000 1.020.000 300.000 200.000
1.000.000 1.020.000 1.200.000 1.000.000
1 1 4 5
1.000.000 1.020.000 300.000 200.000
1.000.000 1.020.000 1.200.000 1.000.000
fixed fixed fixed fixed
rate rate rate rate
5 Bengkulu - Lebong transport inland transport accomodation OSA
1 1 1 1
personx personx personx personx
1 1 4 5
trip trip days days
1 1 4 5
1.000.000 1.020.000 300.000 200.000
1.000.000 1.020.000 1.200.000 1.000.000
1 1 4 5
1.000.000 1.020.000 300.000 200.000
1.000.000 1.020.000 1.200.000 1.000.000
fixed fixed fixed fixed
rate rate rate rate
6 Bengkulu - Bengkulu Tengah transport inland transport accomodation OSA
1 1 1 1
personx personx personx personx
1 1 4 5
trip trip days days
1 1 4 5
1.000.000 1.020.000 300.000 200.000
1.000.000 1.020.000 1.200.000 1.000.000
1 1 4 5
1.000.000 1.020.000 300.000 200.000
1.000.000 1.020.000 1.200.000 1.000.000
fixed fixed fixed fixed
rate rate rate rate
7 Bengkulu - Bengkulu Utara transport inland transport accomodation OSA
1 1 1 1
personx personx personx personx
1 1 4 5
trip trip days days
1 1 4 5
1.000.000 1.020.000 300.000 200.000
1.000.000 1.020.000 1.200.000 1.000.000
1 1 4 5
1.000.000 1.020.000 300.000 200.000
1.000.000 1.020.000 1.200.000 1.000.000
fixed fixed fixed fixed
rate rate rate rate
8 Bengkulu - Tebo transport inland transport accomodation OSA
1 1 1 1
personx personx personx personx
1 1 4 5
trip trip days days
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
fixed fixed fixed fixed
rate rate rate rate
9 Bengkulu - Batanghari transport inland transport accomodation OSA
1 1 1 1
personx personx personx personx
1 1 4 5
trip trip days days
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
fixed fixed fixed fixed
rate rate rate rate
10 Palembang - Tanjung Jabung Barat transport inland transport accomodation OSA
1 1 1 1
personx personx personx personx
1 1 4 5
trip trip days days
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
fixed fixed fixed fixed
rate rate rate rate
11 Palembang - Tanjung Jabung Timur transport inland transport accomodation OSA
1 1 1 1
personx personx personx personx
1 1 4 5
trip trip days days
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
fixed fixed fixed fixed
rate rate rate rate
12 Palembang - Muaro Jambi transport inland transport accomodation OSA
1 1 1 1
personx personx personx personx
1 1 4 5
trip trip days days
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
fixed fixed fixed fixed
rate rate rate rate
13 Palembang - lampung Utara transport inland transport accomodation OSA
1 1 1 1 1
personx personx personx personx personx
1 1 1 4 5
trip trip trip days days
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
fixed fixed fixed fixed
rate rate rate rate
14 Palembang - Tulang Bawang Lampung Timur transport inland transport accomodation OSA
1 1 1 1 1
personx personx personx personx personx
1 1 1 4 5
trip trip trip days days
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
fixed fixed fixed fixed
rate rate rate rate
15 Palembang - Lampung Tengah transport
1 1
personx personx
1 1
trip trip
1
1.400.000
1.400.000
1
1.400.000
1.400.000
fixed rate
transport inland transport accomodation OSA
CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
Unit Rate Amount [IDR] [IDR] 4 5
AMENDMENT NO. 6 Unit Rate [IDR]
Vol.
VARIANT
Amount [IDR]
Vol.
Unit Rate [IDR]
AMENDMENT NO. 7
Amount [IDR]
Vol.
Unit Rate [IDR]
Amount [IDR]
Remarks
1 1 1
personx personx personx
1 4 5
trip days days
1 4 5
1.020.000 300.000 200.000
1.020.000 1.200.000 1.000.000
1 4 5
1.020.000 300.000 200.000
1.020.000 1.200.000 1.000.000
6 fixed rate fixed rate fixed rate
16 Palembang - Lampung Barat transport inland transport accomodation OSA
1 1 1 1 1
personx personx personx personx personx
1 1 1 4 5
trip trip trip days days
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
fixed fixed fixed fixed
rate rate rate rate
17 Palembang - Mesuji transport inland transport accomodation OSA
1 1 1 1 1
personx personx personx personx personx
1 1 1 4 5
trip trip trip days days
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
fixed fixed fixed fixed
rate rate rate rate
18 Palembang - Pring Sewu transport inland transport accomodation OSA
1 1 1 1 1
personx personx personx personx personx
1 1 1 4 5
trip trip trip days days
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
fixed fixed fixed fixed
rate rate rate rate
19 Palembang - Tulang Bawang Barat transport inland transport accomodation OSA
1 1 1 1 1
personx personx personx personx personx
1 1 1 4 5
trip trip trip days days
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
fixed fixed fixed fixed
rate rate rate rate
20 Palembang - Way Kanan transport inland transport accomodation OSA
1 1 1 1 1
personx personx personx personx personx
1 1 1 4 5
trip trip trip days days
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
1 1 4 5
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 1.200.000 1.000.000
fixed fixed fixed fixed
rate rate rate rate
21 Bengkulu - Muko-Muko transport inland transport accomodation OSA
1 1 1 1 1
personx personx personx personx personx
1 1 1 4 5
trip trip trip days days
1 1 1 4
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 300.000 800.000
1 1 1 4
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 300.000 800.000
fixed fixed fixed fixed
rate rate rate rate
22 Bengkulu - Seluma transport inland transport accomodation OSA
1 1 1 1 1
personx personx personx personx personx
1 1 1 4 5
trip trip trip days days
1 1 1 4
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 300.000 800.000
1 1 1 4
1.400.000 1.020.000 300.000 200.000
1.400.000 1.020.000 300.000 800.000
fixed fixed fixed fixed
rate rate rate rate
1.2.6 Pendampingan Kabupaten Baru Pamsimas III 1 PROPINSI SUMATRA SELATAN a Perjalanan DC Sumsel ke Kab Baru di Sumsel (10 lokasi) transport dari kabupaten lama ke kabupaten baru di Sumsel inland transport di 1 kabupaten baru di Sumsel accomodation OSA
10 10 10 10
person x person x person x person x
4 4 4 4
trip trip trip trip
x x x x
1 1 1 1
district district district x district x
5 6
days days
40 40 200 240
250.000 250.000 300.000 50.000
10.000.000 10.000.000 60.000.000 12.000.000
40 40 200 240
250.000 250.000 300.000 50.000
10.000.000 10.000.000 60.000.000 12.000.000
fixed fixed fixed fixed
rate rate rate rate
b Perjalanan PMS Sumsel ke Kab Baru di Sumsel (3 lokasi) transport dari Palembang ke kabupaten baru di Sumsel inland transport di 1 kabupaten baru di Sumsel accomodation OSA
3 3 3 3
person x person x person x person x
4 4 4 4
trip trip trip trip
x x x x
1 1 1 1
district district district x district x
5 6
days days
12 12 60 72
250.000 250.000 300.000 200.000
3.000.000 3.000.000 18.000.000 14.400.000
12 12 60 72
250.000 250.000 300.000 200.000
3.000.000 3.000.000 18.000.000 14.400.000
2 PROPINSI JAMBI a Perjalanan DC Jambi ke Kab Baru di Jambi (8 lokasi) transport dari kabupaten lama ke kabupaten baru di Jambi
4
person x
4
trip
x
2
district
32
250.000
8.000.000
4 4 4
person x person x person x
4 4 4
trip trip trip
x x x
2 2 2
district district x district x
5 6
days days
32 160 192
250.000 300.000 50.000
8.000.000 48.000.000 9.600.000
32 32 160 192
500.000 250.000 300.000 50.000
16.000.000 8.000.000 48.000.000 9.600.000
fixed rate ceilling rate fixed rate
1 1 1 1
person x person x person x person x
4 4 4 4
trip trip trip trip
x x x x
1 1 1 1
district district district x district
5 6
days days
4 4 20 24
1.500.000 1.095.000 300.000 200.000
6.000.000 4.380.000 6.000.000 4.800.000
4 4 20 24
1.500.000 1.095.000 300.000 200.000
6.000.000 4.380.000 6.000.000 4.800.000
ceiling rate fixed rate ceilling rate fixed rate
inland transport accomodation OSA
inland transport di 2 kabupaten baru di Jambi accomodation OSA b Perjalanan ROMS (Palembang) ke Kab Baru di Jambi (1 lokasi) transport dari Palembang ke Jambi inland transport di 1 kabupaten baru di Jambi accomodation OSA
(32) 32
250.000 500.000
(8.000.000) 16.000.000
fixed rate fixed rate ceilling rate fixed rate
fixed rate
CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
3 PROPINSI BENGKULU a Perjalanan DC Bengkulu ke Kab Baru di Bengkulu (4 lokasi) transport dari kabupaten lama ke kabupaten baru di Bengkulu inland transport di 1 kabupaten baru di Bengkulu accomodation OSA
4 4 4 4
person x person x person x person x
4 4 4 4
trip trip trip trip
b Perjalanan PMS Bengkulu ke Kab Baru di Bengkulu (5 lokasi) transport dari Bengkulu ke kabupaten baru di Bengkulu inland transport di 2 kabupaten baru di Bengkulu accomodation OSA
2 2 2 2
person x person x person x person x
4 4 4 4
trip trip trip trip
1 1 1 1
person x person x person x person x
4 4 4 4
trip trip trip trip
4 PROPINSI LAMPUNG a Perjalanan DC Lampung ke Kab Baru di Lampung (4 lokasi) transport dari kabupaten lama ke kabupaen baru di Lampung inland transport di 2 kabupaten baru di Lampung accomodation OSA
2 2 2 2
person x person x person x person x
4 4 4 4
trip trip trip trip
b Perjalanan ROMS Palembang ke Kab Baru di Lampung (1 lokasi) Perjalanan ROMS Palembang ke Kab Baru di Lampung (2 lokasi) transport dari Palembang ke Lampung transport dari Palembang ke Lampung inland transport di 2 kabupaten baru di Lampung inland transport di 2 kabupaten baru di Lampung operational cost accomodation OSA
1 1 1 1 1 1 1
person x person x person x person x person x person x person x
1 2 1 2 1 2 2
trip trip month trip month trip trip
c Perjalanan PMS Sumsel ke Kab Baru di Lampung (2 lokasi) transport dari Palembang ke Lampung inland transport di 1 kabupaten baru di Lampung accomodation OSA
2 2 2 2
person x person x person x person x
4 4 4 4
d Perjalanan PMS Babel-Lampung ke Kab Baru di Lampung (4 lokasi) transport dari Babel ke Lampung inland transport di 1 kabupaten baru di Lampung accomodation OSA
2 2 2 2
person x person x person x person x
2 2 2 2
2 2 2 2
transport dari Bengkulu ke kabupaten baru di Bengkulu inland transport di 1 kabupaten baru di Bengkulu accomodation OSA
transport dari Babel ke Lampung inland transport di 2 kabupaten baru di Lampung accomodation OSA 5 PROPINSI BANGKA BELITUNG a Perjalanan DC Babel ke Kab Baru di Babel (4 lokasi) transport dari Pangkal Pinang ke kabupaten baru di Babel inland transport di 2 kabupaten baru accomodation OSA
x x x x
1 1 1 1
district district district x district x
5 6
x
2 (2 (2
district) district)x district)x
x x x x
1 1 1 1
x
2 (2 (2
Unit Rate Amount [IDR] [IDR] 4 5
AMENDMENT NO. 6 Unit Rate [IDR]
Vol.
VARIANT
Amount [IDR]
Vol.
Unit Rate [IDR]
AMENDMENT NO. 7
Amount [IDR]
Vol.
Unit Rate [IDR]
Amount [IDR]
Remarks 6
days days
16 16 80 96
250.000 250.000 300.000 50.000
4.000.000 4.000.000 24.000.000 4.800.000
16 16 80 96
250.000 250.000 300.000 50.000
4.000.000 4.000.000 24.000.000 4.800.000
fixed rate fixed rate ceilling rate fixed rate
5 6
days days
8 16 40 48
250.000 620.000 300.000 200.000
2.000.000 9.920.000 12.000.000 9.600.000
8 16 40 48
250.000 620.000 300.000 200.000
2.000.000 9.920.000 12.000.000 9.600.000
fixed rate fixed rate ceilling rate fixed rate
district) district) district)x district)x
5 6
days days
4 4 20 24
250.000 620.000 300.000 200.000
1.000.000 2.480.000 6.000.000 4.800.000
4 4 20 24
250.000 620.000 300.000 200.000
1.000.000 2.480.000 6.000.000 4.800.000
fixed rate fixed rate ceilling rate fixed rate
district) district)x district)x
5 6
days days
8 16 40 48
250.000 250.000 300.000 50.000
2.000.000 4.000.000 12.000.000 2.400.000
8 16 40 48
250.000 250.000 300.000 50.000
2.000.000 4.000.000 12.000.000 2.400.000
fixed rate fixed rate ceilling rate fixed rate
1
250.000
250.000
2
1.500.000
3.000.000
ceilling rate
1
6.400.000
6.400.000
4
1.520.000
6.080.000
fixed rate
40 48
300.000 200.000
12.000.000 9.600.000
ceilling rate fixed rate
(Tahap 1-2 dan Tahap 3-4)
(1) 2 (1) 4 (1) 40 48
250.000 1.500.000 6.400.000 1.520.000 2.000.000 300.000 200.000
(250.000) 3.000.000 (6.400.000) 6.080.000 (2.000.000) 12.000.000 9.600.000
x
2
district
x x
2 2
district district
x x
10 12
trip trip trip trip
x x x x
1 1 1 1
district district district x district x
5 6
days days
8 8 40 48
1.500.000 1.520.000 300.000 200.000
12.000.000 12.160.000 12.000.000 9.600.000
8 8 40 48
1.500.000 1.520.000 300.000 200.000
12.000.000 12.160.000 12.000.000 9.600.000
ceilling rate fixed rate ceilling rate fixed rate
2 2 2 2
trip trip trip trip
(tahap 1 x x x
dan 2) 2 district 2 district x 2 district x
days days
4 8 40 48
3.480.000 1.520.000 300.000 200.000
13.920.000 12.160.000 12.000.000 9.600.000
4 8 40 48
3.480.000 1.520.000 300.000 200.000
13.920.000 12.160.000 12.000.000 9.600.000
ceilling rate fixed rate ceilling rate fixed rate
person x person x person x person x
1 2 1 1
trip trip trip trip
(tahap 3 x x x
dan 4) 2 district 2 district x 2 district x
10 12
days days
2 8 40 48
3.480.000 1.520.000 300.000 200.000
6.960.000 12.160.000 12.000.000 9.600.000
2 8 40 48
3.480.000 1.520.000 300.000 200.000
6.960.000 12.160.000 12.000.000 9.600.000
ceilling rate fixed rate ceilling rate fixed rate
person x person x person x person x
4 4 4 4
trip trip trip trip
x
2 (2 (2
5 6
days days
8 16 40 48
250.000 250.000 300.000 50.000
2.000.000 4.000.000 12.000.000 2.400.000
8 16 40 48
250.000 250.000 300.000 50.000
2.000.000 4.000.000 12.000.000 2.400.000
fixed rate fixed rate ceilling rate fixed rate
1
district district)x district)x
5 6
2.000.000
2.000.000
days days
CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
b Perjalanan PMS Babel - Lampung ke Kab Baru di Babel (2 lokasi) transport dari Pangkal Pinang ke kabupaten baru di Babel
1 1 1 1 1
inland transport di 2 kabupaten baru accomodation OSA
1.3 1.3.1 1
days days
Vol.
Amount [IDR]
250.000
1.000.000
8 20 24
700.000 300.000 200.000
5.600.000 6.000.000 4.800.000
(4) 4
250.000 1.500.000
(1.000.000) 6.000.000
4 8 20 24
1.500.000 700.000 300.000 200.000
6.000.000 5.600.000 6.000.000 4.800.000
444.360.000
1 1 1 1 1 1 1 1
person person person person person person person person
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
4 4 5 4 4 5 4 5
time time time time time time time time
x x x x x
1 1 2 2 3
days days days days days
1 1 1 1 1 1 1 1
person person person person person person person person
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
4 4 5 4 4 5 4 5
time time time time time time time time
x x x x x
1 1 2 2 3
days days days days days
7 7
person person
x x
1 1
years years
x x
4 5
time time
x x
1 2
days days
Province Team to Other Province - 4 time From Bengkulu to Jambi Transport to Jambi Acocomodation OSA
3 3 3 3
person person person person
x x x x
1 1 1 1
years years years years
x x x x
7 7 7 7
time time time time
x x
4 5
From Bangka Belitung to Lampung Transport to Lampung Acocomodation OSA
3 3 3 3
person person person person
x x x x
1 1 1 1
years years years years
x x x x
7 7 7 7
time time time time
x x
District Team (DC and DFMA) to Province (in Province) - 4 time District Team (DC and DFMA) Provincial Bengkulu 8 Transport to Bengkulu 8 8 Acocomodation 8 8 OSA 8 8
person person person person person person person
x x x x x x x
1 1 1 1 1 1 1
years years years years years years years
x x x x x x x
4 4 5 4 5 4 5
time time time time time time time
8 8 8 8 8 8
person person person person person person
x x x x x x
1 1 1 1 1 1
years years years years years years
x x x x x x
4 5 4 5 4 5
4 4 4 4 4 4
person person person person person person
x x x x x x
1 1 1 1 1 1
years years years years years years
x x x x x x
20 20 20
person person person
x x x
1 1 1
years years years
x x x
From Bangka Belitung to Palembang Transport to Palembang
District Team (DC and DFMA) Provincial Jambi Transport to Jambi
District Team (DC and DFMA) Provincial Babel Transport to Pangkalpinang Acocomodation OSA
District Team (DC and DFMA) Provincial Sumsel Transport to Palembang Acocomodation
Remarks 6
4
136.055.167
OSA
4
5 6
Amount [IDR]
-
Acocomodation
3
district district)x district)x
Vol.
31.376.667
Fullboard meeting in regional (ROMS dan PMS)
2
2 (2 (2
Amount [IDR]
AMENDMENT NO. 7 Unit Rate [IDR]
444.360.000
OSA
1.3.3 1
x
Vol.
VARIANT Unit Rate [IDR]
104.918.500
Acommodation Acommodation
2
trip trip trip trip trip
Unit Rate [IDR]
Coordination Meeting Province to Regional (in Regional) - 4 time Province to Regional (in Regional) - 5 time From Bengkulu to Palembang Transport to Palembang
OSA
1.3.2 1
4 4 4 4 4
AMENDMENT NO. 6
Management Fee 10 % of [1.2]
Acommodation Acommodation
2
person x person x person x person x person x
Unit Rate Amount [IDR] [IDR] 4 5
fixed rate fixed rate ceilling rate fixed rate
4
2.500.000
10.000.000
4
2.500.000
10.000.000
ceiling rate
4
300.000
1.200.000
4
300.000
1.200.000
ceiling rate ceiling rate
8
200.000
1.600.000
8
200.000
1.600.000
fixed rate
4
1.500.000
6.000.000
4
1.500.000
6.000.000
ceiling rate
4
300.000
1.200.000
4
300.000
1.200.000
ceiling rate ceiling rate
8
200.000
1.600.000
8
200.000
1.600.000
fixed rate
28
350.000
9.800.000
28
350.000
9.800.000
ceiling rate
days days
21 84 105
4.480.000 300.000 200.000
94.080.000 25.200.000 21.000.000
21 84 105
4.480.000 300.000 200.000
94.080.000 25.200.000 21.000.000
ceiling rate ceiling rate fixed rate
4 5
days days
21 84 105
3.480.000 300.000 200.000
73.080.000 25.200.000 21.000.000
21 84 105
3.480.000 300.000 200.000
73.080.000 25.200.000 21.000.000
ceiling rate ceiling rate fixed rate
32
250.000
8.000.000
32
250.000
8.000.000
fixed rate
x x x x
1 2 2 3
days days days days
32
300.000
9.600.000
32
300.000
9.600.000
ceiling rate
64
50.000
3.200.000
64
50.000
3.200.000
fixed rate
time time time time time time
32
250.000
8.000.000
32
250.000
8.000.000
fixed rate
x x x x
1 2 2 3
days
32
300.000
9.600.000
32
300.000
9.600.000
ceiling rate
days days
64
50.000
3.200.000
64
50.000
3.200.000
fixed rate
4 5 4 5 4 5
time time time time time time
16
250.000
4.000.000
16
250.000
4.000.000
fixed rate
x x x x
1 2 2 3
days days days days
16
300.000
4.800.000
16
300.000
4.800.000
ceiling rate
32
50.000
1.600.000
32
50.000
1.600.000
fixed rate
4 5 4
time time time
80
250.000
20.000.000
80
250.000
20.000.000
fixed rate
x
1
days
80
300.000
24.000.000
80
300.000
24.000.000
ceiling rate
CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
20 20 20
person person person
x x x
1 1 1
years years years
x x x
5 4 5
time time time
x x x
2 2 3
days days days
4 4 4 4 4 4
person person person person person person
x x x x x x
1 1 1 1 1 1
years years years years years years
x x x x x x
4 4 4 4 4 4
time time time time time time
x x x x
1 1 2 2
days days days days
District Team (DEAO) to Province (in Province) - 2 time District Team (DEAO) Provincial Bengkulu Transport to Bengkulu Acocomodation OSA
4 4 4 4
person person person person
x x x x
1 1 1 1
years years years years
x x x x
2 2 2 2
time time time time
x x
1 2
days days
District Team (DEAO) Provincial Jambi District Team (DEAO) Provincial Jambi Transport to Jambi Transport to Jambi Acocomodation Acocomodation OSA OSA
4 4 4 4 4 4 4 4
person person person person person person person person
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
2 6 2 6 2 6 2 6
time time time time time time time time
x x x x
1 1 2 2
days days days days
District Team (DEAO) Provincial Babel Transport to Pangkalpinang Acocomodation OSA
2 2 2 2
person person person person
x x x x
1 1 1 1
years years years years
x x x x
2 2 2 2
time time time time
x x
1 2
10 10 10 10
person person person person
x x x x
1 1 1 1
years years years years
x x x x
2 2 2 2
time time time time
x x
2 2 2 2
person person person person
x x x x
1 1 1 1
years years years years
x x x x
2 2 2 2
time time time time
x x
OSA
5
District Team (DC and DFMA) Provincial Lampung Transport to Lampung Acocomodation OSA
1.3.4
District Team (DEAO) Provincial Sumsel Transport to Palembang Acocomodation OSA District Team (DEAO) Provincial Lampung Transport to Lampung Acocomodation OSA
Unit Rate Amount [IDR] [IDR] 4 5
AMENDMENT NO. 6 Unit Rate [IDR]
Vol.
``
2
Coordination Meeting For Several Event By Request Regional Team to Province to District/Village to Province Bengkulu : Transport to Bengkulu Transport to Bengkulu Transport to Bengkulu Inland Transport Inland Transport Inland Transport Acocomodation Acocomodation Acocomodation OSA OSA OSA
2 4 2 2 4 2 2 4 2 2 4 2
person person person person person person person person person person person person
x x x x x x x x
to Provinsi Jambi : Transport to Jambi Transport to Jambi Transport to Jambi Inland Transport Inland Transport Inland Transport Acocomodation Acocomodation Acocomodation OSA OSA OSA
2 4 2 2 4 2 2 4 2 2 4 2
person person person person person person person person person person person person
x x x
1 1 1 1 1 1 1 1 1 1 1 1
years years years years years years years years years years years years
x x x x x x x x x x x x
4 4 4 4 4 4 4 4 4 4 4 4
time time time time time time time time time time time time
x x x x x x x x x x x x
1 1 1 1 1 1 1 1 1 1 1 1
years years years years years years years years years years years years
x x x x x x x x x x x x
4 4 4 4 4 4 4 4 4 4 4 4
time time time time time time time time time time time time
Amount [IDR]
Vol.
AMENDMENT NO. 7
Amount [IDR]
Vol.
Unit Rate [IDR]
Amount [IDR]
Remarks 6 fixed rate
160
50.000
8.000.000
160
50.000
8.000.000
16
250.000
4.000.000
16
250.000
4.000.000
fixed rate
16
300.000
4.800.000
16
300.000
4.800.000
ceiling rate
32
50.000
1.600.000
32
50.000
1.600.000
fixed rate
8 8 16
250.000 300.000 50.000
2.000.000 2.400.000 800.000
8 8 16
250.000 300.000 50.000
2.000.000 2.400.000 800.000
fixed rate ceiling rate fixed rate
24
250.000
6.000.000
24
250.000
6.000.000
fixed rate ceiling rate 24
300.000
7.200.000
24
300.000
7.200.000
48
50.000
2.400.000
48
50.000
2.400.000
days days
4 4 8
250.000 300.000 50.000
1.000.000 1.200.000 400.000
4 4 8
250.000 300.000 50.000
1.000.000 1.200.000 400.000
fixed rate ceiling rate fixed rate
1 2
days days
20 20 40
250.000 300.000 50.000
5.000.000 6.000.000 2.000.000
20 20 40
250.000 300.000 50.000
5.000.000 6.000.000 2.000.000
fixed rate ceiling rate fixed rate
1 2
days days
4 4 8
250.000 300.000 50.000
1.000.000 1.200.000 400.000
4 4 8
250.000 300.000 50.000
1.000.000 1.200.000 400.000
fixed rate ceiling rate fixed rate
fixed rate
Management Fee 10 % of [1.3] 1.4 1.4.1 1
VARIANT Unit Rate [IDR]
x x x x x x
4 4 4 5 5 5
days days days days days days
44.436.000
-
44.436.000
109.520.000
-
109.520.000
8
2.500.000
20.000.000
8
2.500.000
20.000.000
8
620.000
4.960.000
8
620.000
4.960.000
32
300.000
9.600.000
32
300.000
9.600.000
40
200.000
8.000.000
40
200.000
8.000.000
8
1.500.000
12.000.000
8
1.500.000
12.000.000
8
300.000
2.400.000
8
300.000
2.400.000
32
300.000
9.600.000
32
300.000
9.600.000
40
200.000
8.000.000
40
200.000
8.000.000
ceiling rate ceiling rate ceiling rate fixed rate fixed rate fixed rate ceiling rate ceiling rate ceiling rate fixed rate fixed rate fixed rate
ceiling rate ceiling rate fixed rate fixed rate x x x x x x
4 4 4 5 5 5
days days days days days days
ceiling rate ceiling rate fixed rate fixed rate
CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
3
``
4
5
1.4.2 1
to Province Babel : Transport to Pangkal Pinang Transport to Pangkal Pinang Transport to Pangkal Pinang Inland Transport Inland Transport Inland Transport Acocomodation Acocomodation Acocomodation OSA OSA OSA
2 4 2 2 4 2 2 4 2 2 4 2
person person person person person person person person person person person person
x x x x x x x x x x x x
1 1 1 1 1 1 1 1 1 1 1 1
years years years years years years years years years years years years
x x x x x x x x x x x x
4 4 4 4 4 4 4 4 4 4 4 4
time time time time time time time time time time time time
to Province Lampung Transport to Lampung Transport to Lampung Transport to Lampung Inland Transport Inland Transport Inland Transport Acocomodation Acocomodation Acocomodation OSA OSA OSA
2 4 2 2 4 2 2 4 2 2 4 2
person person person person person person person person person person person person
x x x x x x x x x x x x
1 1 1 1 1 1 1 1 1 1 1 1
years years years years years years years years years years years years
x x x x x x x x x x x x
4 4 4 4 4 4 4 4 4 4 4 4
time time time time time time time time time time time time
to Province Sumatera Selatan Inland Transport Inland Transport Inland Transport Acocomodation Acocomodation Acocomodation OSA OSA OSA
2 4 2 2 4 2 2 4 2
person person person person person person person person person
x x x x x x x x x
1 1 1 1 1 1 1 1 1
years years years years years years years years years
x x x x x x x x x
4 4 4 4 4 4 4 4 4
time time time time time time time time time
4 4 1 1 1 1 1 1 1 1 1 1
person person person person person person person person person person person person
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
time time time time time trip time time time time time trip time time time
Panitia Pengadaan FM to other Province or local trip Tim ROMS Palembang to Palembang local Transport Robert Natakusuma Bengkulu to Bengkulu local Transport Rullyansyah Bengkulu to Jambi Transport OSA Acocomodation Sawaludin Pangkal Pinang to Lampung local Transport Gusti Fajrianto Palembang to Tanjung Pinang Transport Inland Transport OSA Acocomodation
1 1
person person
1.4.2. Pendampingan Seleksi Fasilitator Pamsimas 3 (Tim Pengadaan Fasilitator Daerah) a. Palembang to Palembang local transport accomodation
Unit Rate Amount [IDR] [IDR] 4 5
AMENDMENT NO. 6 Unit Rate [IDR]
Vol.
Amount [IDR]
Vol.
Amount [IDR]
AMENDMENT NO. 7 Vol.
Unit Rate [IDR]
Amount [IDR]
Remarks 6
ceiling rate ceiling rate 8
1.500.000
12.000.000
8
1.500.000
12.000.000
8
700.000
5.600.000
8
700.000
5.600.000
fixed rate fixed rate x x x x x x
4 4 4 5 5 5
days days days days days days
ceiling rate ceiling rate 32
300.000
9.600.000
32
300.000
9.600.000
40
200.000
8.000.000
40
200.000
8.000.000
8
1.500.000
12.000.000
8
1.500.000
12.000.000
8
1.520.000
12.160.000
8
1.520.000
12.160.000
32
300.000
9.600.000
32
300.000
9.600.000
40
200.000
8.000.000
40
200.000
8.000.000
8
1.020.000
8.160.000
8
1.020.000
8.160.000
fixed rate fixed rate
ceiling rate ceiling rate fixed rate fixed rate x x x x x x
4 4 4 5 5 5
days days days days days days
ceiling rate ceiling rate fixed rate fixed rate
fixed rate fixed rate x x x x x x
4 4 4 5 5 5
days days days days days days
ceiling rate ceiling rate 32
300.000
9.600.000
32
300.000
9.600.000
40
200.000
8.000.000
40
200.000
8.000.000
fixed rate fixed rate
fixed rate
1 x
x x x
2
days
fixed rate
1 6 1
days days
fixed rate fixed rate ceiling rate
2
days
fixed rate
2 2 1
days days days
fixed rate x x x
fixed rate ceiling rate
4 4 4
prs prs prs
x x
1 1 1
time time time
x x
7 6
days nights
b. Bengkulu to Bengkulu local transport accomodation
1 1 1
prs prs prs
x x
1 1 1
time time time
x x
6 5
days nights
28 24 6 5
c. Bengkulu to Jambi Transport Inland/local Transport OSA Acocomodation
1 1 1 1 1
prs prs prs prs prs
x x x x
1 1 1 1 1
time trip time time time
6 5
1 1 1 days night
1 1 6 5
x x
VARIANT Unit Rate [IDR]
100.000 200.000
100.000 200.000
2.800.000 4.800.000 600.000 1.000.000
28 24 6 5
4.480.000 250.000 200.000 300.000
4.480.000 250.000 1.200.000 1.500.000
1 1 6 5
100.000 200.000
100.000 200.000
2.800.000 4.800.000 600.000 1.000.000
4.480.000 250.000 200.000 300.000
4.480.000 250.000 1.200.000 1.500.000
CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
d. Pangkal Pinang to Lampung Transport Inland/local Transport OSA Acocomodation
1 1 1 1 1
prs prs prs prs prs
x x x x
1 1 1 1 2
time trip time time time
x x x
1 6 5
1 days days nights
e. Palembang to Lampung Transport Inland/local Transport OSA Acocomodation
1 1 1 1 1
prs prs prs prs prs
x x x x
1 1 1 1 1
time trip time time time
x x x
1 6 5
1 days days nights
f. Palembang to Pangkal Pinang Transport Inland/local Transport OSA Acocomodation
1 1 1 1 1
prs prs prs prs prs
x x x x
1 1 1 1 1
time trip time time time
x x x
1 5 4
1 days days nights
AMENDMENT NO. 6
Unit Rate Amount [IDR] [IDR] 4 5
Unit Rate [IDR]
Vol.
2
3
1 1 6 5 1 1 5 4
3.480.000 250.000 200.000 300.000
Vol.
Amount [IDR]
Vol.
1.500.000 250.000 200.000 300.000
1.500.000 250.000 200.000 300.000
3.480.000 250.000 1.200.000 3.000.000
1 1 6 10
1.500.000 250.000 1.200.000 1.500.000 1.500.000 250.000 1.000.000 1.200.000
1 1 6 5 1 1 5 4
10.952.000
3.480.000 250.000 200.000 300.000
1.500.000 250.000 200.000 300.000
1.500.000 250.000 200.000 300.000
-
person person person person person person person person
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
4 4 4 4 -
time time time time time time time time
Provincial to Jakarta [PC] Provincial to Jakarta Air Transport Air Transport Inland Transport Inland Transport Acocomodation accomodation OSA OSA
1 1 1 1 1 1 1 1
person person person person person person person person
x x x x x x x x
1 1 1 1 1 1 1 1
years years years years years years years years
x x x x x x x x
4 4 4 4 -
time time time time time time time time
x x x x
District to Jakarta Air Transport Inland Transport Acocomodation OSA
-
person person person person
x x x x
1 1 1 1
years years years years
x x x x
2 2 2 2
time time time time
x x
x x x x
days days days days
4 4 8 12 -
2.120.000 400.000 300.000 200.000 -
8.480.000 1.600.000 2.400.000 2.400.000 -
2 2 3 3
days days days days
4 4 8 12 -
2.120.000 400.000 300.000 200.000 -
8.480.000 1.600.000 2.400.000 2.400.000 -
2 3
days days
2 2 3 3
Amount [IDR]
Remarks
3.480.000 250.000 1.200.000 3.000.000
1.500.000 250.000 1.200.000 1.500.000 1.500.000 250.000 1.000.000 1.200.000 10.952.000
29.760.000
1 1 1 1 1 1 1 1
Management Fee 10 % of [1.5]
Amount [IDR]
AMENDMENT NO. 7 Unit Rate [IDR]
6 1 1 6 10
Management Fee 10 % of [1.4] 1.5 National Meeting in Jakarta (by Request) targeted 2016 1 Regional to Jakarta [PM] Regional to Jakarta Air Transport Air Transport Inland Transport Inland Transport Acocomodation accomodation OSA OSA
VARIANT Unit Rate [IDR]
29.760.000
4 4 8 12
4 4 8 12 -
2.120.000 400.000 300.000 200.000 -
8.480.000 1.600.000 2.400.000 2.400.000 -
2.120.000 400.000 300.000 200.000 -
8.480.000 1.600.000 2.400.000 2.400.000 -
ceiling rate fixed rate ceiling rate fixed rate
ceiling rate fixed rate ceiling rate fixed rate
ceiling rate fixed rate ceiling rate fixed rate -
2.976.000
-
2.976.000
REGIONAL OVERSIGHT MANAGEMENT SERVICES (ROMS) - 2 COMMUNITY BASED WATER SUPPLY PROJECT (PAMSIMAS II) ORIGINAL CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
B
Unit Rate [IDR] 4
2 MOBILIZATION AND DEMOBILIZATION Regional Team - Jakarta to Province to Jakarta Project Manager Data Management LG Specialist Trainer Coordinator Local Transport Provincial Team - Jakarta to Province to Jakarta Provincial Coordinator / LG
2.2.2
Financial Management Specialist
2.2.3
Quality Assurance Specialist
2.2.4 Local Transport 2,3 District Team - Jakarta to Province to Jakarta 2.3.1 District Coordinator
New District Coordinator
2.3.2
Financial Management Assistant
2.3.3
Local Transport (Province to District)
- Palembang - Palembang - Palembang - Palembang
Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta Jakarta
- Jakarta - Jakarta - Jakarta - Jakarta
Unit Rate [IDR]
Vol.
AMENDMENT NO. 7 Amount [IDR]
Vol.
Unit Rate [IDR]
Amount [IDR]
Remarks 6
3,1 3.1.1 3.1.2 3.1.3
Regional Team & Prov. Team Provincial Team Regional Team & Prov. Team Provincial Team
3.1.4
Office Running Cost
3,2 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5
District Team District Team in District Team in District Team in District Team in District Team in
3.2.6
Office Running Cost
63.710.000
x x x x x
1 1 1 1 1
r-trip r-trip r-trip r-trip r-trip
1 1 1 1 4
2.120.000 2.120.000 2.120.000 2.120.000 200.000
2.120.000 2.120.000 2.120.000 2.120.000 800.000
-
2.120.000 2.120.000 2.120.000 2.120.000 200.000
-
-
-
ceiling ceiling ceiling ceiling ceiling
rate rate rate rate rate
- Palembang - Jakarta - Pangkal Pinang - Jakarta - Bengkulu - Jakarta - Palembang - Jakarta - Pangkal Pinang - Jakarta - Bengkulu - Jakarta - Palembang - Jakarta - Pangkal Pinang - Jakarta - Bengkulu - Jakarta
1 1 1 1 1 1 1 1 1 9
pers pers pers pers pers pers pers pers pers pers
x x x x x x x x x x
1 1 1 1 1 1 1 1 1 1
r-trip r-trip r-trip r-trip r-trip r-trip r-trip r-trip r-trip r-trip
1 1 1 1 1 1 1 1 1 9
2.120.000 2.000.000 2.450.000 2.120.000 2.000.000 2.450.000 2.120.000 2.000.000 2.450.000 200.000
2.120.000 2.000.000 2.450.000 2.120.000 2.000.000 2.450.000 2.120.000 2.000.000 2.450.000 1.800.000
-
2.120.000 2.000.000 2.450.000 2.120.000 2.000.000 2.450.000 2.120.000 2.000.000 2.450.000 200.000
-
-
-
ceiling ceiling ceiling ceiling ceiling ceiling ceiling ceiling ceiling ceiling
rate rate rate rate rate rate rate rate rate rate
Jakarta - Bengkulu - Jakarta Jakarta - Jambi - Jakarta Jakarta - Pangkal Pinang - Jakarta Jakarta - Palembang - Jakarta Jakarta - Lampung - Jakarta Jakarta - Bengkulu - Jakarta Jakarta - Jambi - Jakarta Jakarta - Pangkal Pinang - Jakarta Jakarta - Palembang - Jakarta Jakarta - Lampung - Jakarta Jakarta - Bengkulu - Jakarta Jakarta - Jambi - Jakarta Jakarta - Pangkal Pinang - Jakarta Jakarta - Palembang - Jakarta Jakarta - Lampung - Jakarta old district new district
4 4 2 10 2 5 5 4 3 10 4 4 2 10 2 44 27
pers pers pers pers pers pers pers pers pers pers pers pers pers pers pers pers pers
x x x x x x x x x x x x x x x x x
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
r-trip r-trip r-trip r-trip r-trip r-trip r-trip r-trip r-trip r-trip r-trip r-trip r-trip r-trip r-trip r-trip r-trip
4 4 2 10 2
2.450.000 2.300.000 2.000.000 2.120.000 1.480.000
9.800.000 9.200.000 4.000.000 21.200.000 2.960.000
-
2.450.000 2.300.000 2.000.000 2.120.000 1.480.000
-
2.450.000 2.300.000 2.000.000 2.120.000 1.480.000 400.000
12.250.000 11.500.000 8.000.000 6.360.000 14.800.000 10.800.000
ceiling ceiling ceiling ceiling ceiling
rate rate rate rate rate
ceiling ceiling ceiling ceiling ceiling ceiling
rate rate rate rate rate rate
2
Bengkulu Palembang Bangka Belitung
4 4 2 10 2 pamsimas 2 pamsimas 2
5 5 4 3 10 4 4 2 10 2 44
2.450.000 2.300.000 2.000.000 2.120.000 1.480.000 400.000
office office office office office
old district new district
3 9 3
pers pers pers
x x x
6 6 6
3
office
x
32
3 3 3 3 3
pers pers pers pers pers
x x x x x
6 6 6 6 6
8 14
office office
x x
32 32
m2 m2 m2
+ + +
month
+
m2 m2 m2 m2 m2
+ + + + +
month month
+ +
40 40 40
m2 m2 m2
= = =
58 94 58
m2 m2 m2
m2 m2 m2 m2 m2
= = = = =
58 58 58 58 58
-
2.450.000 2.300.000 2.000.000 2.120.000 1.480.000 400.000
old district new district new district
8 14 27
office office office
x
32
x x x
32 32 3
month
month month month
+ +
Office Supply, Consumable, and Office Running Cost
(3 month) (3 month)
6.371.000
816.800.000
57.900.000
874.700.000
1.500.000 2.000.000 1.500.000
36.000.000 48.000.000 36.000.000
96
750.000
72.000.000
96
750.000
72.000.000
24 24 24 24 24
2.600.000 2.600.000 1.300.000 6.500.000 1.300.000
62.400.000 62.400.000 31.200.000 156.000.000 31.200.000
24 24 24 24 24
2.600.000 2.600.000 1.300.000 6.500.000 1.300.000
62.400.000 62.400.000 31.200.000 156.000.000 31.200.000
256 448
400.000 400.000
102.400.000 179.200.000
256 448
400.000 400.000
102.400.000 179.200.000
96 63
96
600.000
33 63
600.000 1.350.000
19.800.000 85.050.000
256 448
256 448
88 154
30.800.000 53.900.000 126.000.000 220.500.000
488.127.500 14.000.000
168 294
(purchase) rental (purchase) (purchase)
11
+ +
22 27 22 1
pers pers pers pers
x x x x
1 1 1 1
unit unit unit unit
57.600.000
-
350.000 350.000
-
168 294
2
7.000.000
14.000.000 14.000.000
2
7.000.000
7.000.000 6.500.000
89.600.000 156.800.000
-
3 3 3
3 3 3 3 3
1.500.000 2.000.000 1.500.000
4.500.000 6.000.000 4.500.000
27 27 27
1.500.000 2.000.000 1.500.000
40.500.000 54.000.000 40.500.000
fixed rate fixed rate fixed rate
750.000
-
96
750.000
72.000.000
fixed rate
2.600.000 2.600.000 1.300.000 6.500.000 1.300.000
7.800.000 7.800.000 3.900.000 19.500.000 3.900.000
27 27 27 27 27
2.600.000 2.600.000 1.300.000 6.500.000 1.300.000
70.200.000 70.200.000 35.100.000 175.500.000 35.100.000
fixed rate fixed rate fixed rate fixed rate fixed rate
400.000 400.000
-
256 448
400.000 400.000
102.400.000 179.200.000
fixed rate fixed rate
536.050.000
350.000 350.000 350.000 750.000 750.000
-
27
816.800.000 24 24 24
350.000 350.000
5 5 4 3 10
2.716.000
36.000.000 48.000.000 36.000.000
(3 month) (3 month)
12.250.000 11.500.000 8.000.000 6.360.000 14.800.000 10.800.000
-
1.500.000 2.000.000 1.500.000
m2 m2 m2 m2 m2
2.450.000 2.300.000 2.000.000 2.120.000 1.480.000 400.000
14.271.000
304.000.000 3 office pamsimas 2
-
24 24 24
(3 month)
40 40 40 40 40
9.800.000 9.200.000 4.000.000 21.200.000 2.960.000 17.600.000
27
4 UTILITIES EXPENSES 4,1 Regional and Province 4.1.1 Office Supply and Consumable 4.1.2 Office Supply, Consumable, and Office Running Cost
5 OFFICE EQUIPMENT Notebook Computer (Regional+Provincial+District) Notebook Computer (New District) Notebook Computer for DFMA Portable Computer for Supporting Regional
52.910.000
pers pers pers pers pers
Bengkulu Jambi Bangka Belitung Sumatera Selatan Lampung
4,2 District 4.2.1 Office Supply and Consumable
-
1 1 1 1 4
3 OFFICE SPACE (Rental)
5. 2 5. 3
VARIANT
Amount [IDR]
5
142.710.000 Jakarta Jakarta Jakarta Jakarta
Management Fee 10 % of [2.1 + 2.2 + 2.3]
5. 1
Unit Rate [IDR]
Vol.
REIMBURSABLE COST
2,1 2.1.1 2.1.2 2.1.3 2.1.4 2.1.5 2,2 2.2.1
4.2.2
AMENDMENT NO. 6
Amount [IDR]
22 1
7.000.000 6.500.000
154.000.000 6.500.000
122.400.000
658.450.000
9
600.000 1.350.000
12.150.000
33 72
600.000 1.350.000
19.800.000 97.200.000
fixed rate fixed rate
350.000 350.000 750.000 750.000 750.000
60.750.000 18.000.000 31.500.000
88 154 81 192 336
350.000 350.000 750.000 750.000 750.000
30.800.000 53.900.000 60.750.000 144.000.000 252.000.000
fixed rate fixed rate
81 24 42
27
850.000
2 27 22 1
7.000.000 850.000 7.000.000 6.500.000
547.527.500 14.000.000 22.950.000 154.000.000 6.500.000
59.400.000 22.950.000
fixed rate fixed rate
fixed rate fixed rate fixed rate
ORIGINAL CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
5. 4 5. 5 5. 6 5. 7 5. 8 5. 9 5. 10 5. 11 5. 12 5. 13
Portable Computer for Supporting Province Portable Computer + Printer for Supporting District Portable Computer + Printer for Supporting New District Printer Laserjet Printer Colour A3 Scanner for District Facsimilie Digital Camera for District GSM Modem + SIM Card Router, LAN Peripheral GPS for District
(purchase) (purchase) rental (purchase) (purchase) (purchase) (purchase) (purchase) (purchase) (purchase) (purchase)
3 22 27 3 3 22 3 22 3 3 22
pers pers pers office office office office office office office office
x x x x x x x x x x x
1 1 1 1 1 1 1 1 1 1 1
unit unit unit unit unit unit unit unit unit unit unit
5. 14
Projector LCD for Province
(purchase)
3
office
x
1
unit
5. 15
Computer Desk/Work Table and Chair
(purchase)
4
pers
x
1
unit
5. 16
Biaya Pemeliharaan Peralatan [5% x Total Cost termasuk peralatan yang dibeli tim bridging] 6 6,1 6,2 6,3
VEHICLE RENTAL Car including O&M Car including O&M Car including O&M Car including O&M Car including O&M
and Driver (Regional Team) and Driver (Provincial Team) (District Team) Old District (District Team) New District and Driver (District Team) Old
-
-
1 3 8 14 8
office office office office office
x x x x x
1 1 1 1 1
unit unit unit unit unit
x x x x x
32 32 32 32 23
month month month month month
Car including O&M and Driver (District Team) New
(rental)
14
office
x
1
unit
x
23
month
Car including O&M and Driver (District Team) New Pam 3
allowance
27
pers
x
1
unit
x
3
month
COMMUNICATION Regional and Province Telephone and Postage Internet Connection for Office District Telephone and Internet Connection
8 8,1 8.1.1 a b 8.1.2 a b c d e 8.1.3
TRAINING Pelatihan FM Ass. dan Data Entry Operator Peserta Paket Fullboard Transportation Participant Pelatih (air transport economy class) Financial Management Spec. Financial Management Spec. Inland Transport Accomodation OSA (Fixed) Training Material + Kit
32 96 256 448
3.500.000 4.000.000 2.500.000 2.500.000 3.500.000 600.000 750.000 4.500.000
6.500.000 6.500.000 5.000.000 5.000.000
old district new district new district
8 14 27
22 22
a b c d e f
8.3.3. a b
Inland Transport District Team District Team
Unit Rate [IDR]
Vol.
Amount [IDR]
Remarks
5 -
3
6.500.000
19.500.000
-
4.352.000.000 208.000.000 624.000.000 1.280.000.000 2.240.000.000
1.350.000
36.450.000
3
6.500.000
19.500.000
27
1.350.000
36.450.000
6 fixed rate
22
2.500.000
55.000.000
22
2.500.000
55.000.000
fixed rate
22
3.500.000
77.000.000
22
3.500.000
77.000.000
fixed rate
22
4.500.000
99.000.000
22
4.500.000
99.000.000
fixed rate
3
6.000.000
18.000.000
3
6.000.000
18.000.000
fixed rate
4
500.000
2.000.000
4
500.000
2.000.000
fixed rate
0
862.550.000
43.127.500
0
862.550.000
43.127.500
ceiling rate
32 96 72 126 184
6.500.000 6.500.000 5.000.000 5.000.000 6.400.000
5.060.400.000 208.000.000 624.000.000 360.000.000 630.000.000 1.177.600.000
3 9 24 42 24
6.500.000 6.500.000 5.000.000 5.000.000 6.400.000
870.900.000 19.500.000 58.500.000 120.000.000 210.000.000 153.600.000
35 105 96 168 208
6.500.000 6.500.000 5.000.000 5.000.000 6.400.000
5.931.300.000 227.500.000 682.500.000 480.000.000 840.000.000 1.331.200.000
fixed rate fixed rate fixed rate fixed rate fixed rate
322
6.400.000
2.060.800.000
42
6.400.000
268.800.000
364
6.400.000
2.329.600.000
fixed rate
81
500.000
40.500.000
81
500.000
40.500.000
457.600.000
83.400.000
541.000.000
1 1
line line
x x
32 32
month month
96 96
750.000 350.000
72.000.000 33.600.000
96 96
750.000 350.000
72.000.000 33.600.000
9 9
750.000 350.000
6.750.000 3.150.000
105 105
750.000 350.000
78.750.000 36.750.000
ceiling rate ceiling rate
district district district
x x x
1 1 1
line line line
x x x
32 32 3
month month month
256 448
500.000 500.000
128.000.000 224.000.000
256 448
500.000 500.000
128.000.000 224.000.000
24 42 81
500.000 500.000 500.000
12.000.000 21.000.000 40.500.000
280 490 81
500.000 500.000 500.000
140.000.000 245.000.000 40.500.000
ceiling rate ceiling rate
district district
district
45.760.000
45.760.000
5.496.910.000
4.339.413.000
4.290.000
50.050.000
(1.830.196.000)
2.457.587.000
x x
2 2
pers pers
x x
3 1
days time
132 44
200.000 200.000
26.400.000 8.800.000
132 44
200.000 200.000
26.400.000 8.800.000
fixed rate ceiling rate
pers pers trip pers trip pers
x x
1 1
r-trip r-trip
x
1 1 2 2 2 2
x x x
3 4 1
days days package
1 1 2 6 8 44
4.750.000 3.480.000 200.000 300.000 200.000 100.000
4.750.000 3.480.000 400.000 1.800.000 1.600.000 4.400.000
1 1 2 6 8 44
4.750.000 3.480.000 200.000 300.000 200.000 100.000
4.750.000 3.480.000 400.000 1.800.000 1.600.000 4.400.000
ceiling rate ceiling rate ceiling rate fixed rate ceiling rate ceiling rate
2.343.000
1 3
reg prov
x x
4 3
pers pers
x x
3 3
days days
x x
6 6
time time
72 162
300.000 300.000
Management Fee 10 % of [8.2.4 + 8.2.5]
Air Transport [Economy Class] Transport Regional Team/ Palembang Regional Team/ Palembang Regional Team/ Palembang Regional Team/ Palembang Provincial Team/ Bengkulu Provincial Team/ Pangkal Pinang
AMENDMENT NO. 7 Amount [IDR]
2.343.000
-
covered by CMAC covered by CMAC covered by CMAC 21.600.000 48.600.000
72 162
300.000 300.000
7.020.000
8,3 Expert Group Meeting - Regional 8.3.1 Fullboard meeting Fullboard package for district team Fullboard package for district team Fullboard package for provincial team Fullboard package for provincial team Fullboard package for regional team Fullboard package for regional team 8.3.2
Unit Rate [IDR]
Vol.
x x
Bengkulu - Jambi Pangkal Pinang - Lampung
22
VARIANT
Amount [IDR]
office office
Management Fee 10 % of [8.1.1b + 8.1.2a + 8.1.2b + 8.1.2c + 8.1.2e + 8.1.3] Expert Group Meeting - Central Regional Team - Air Fare Province to Jakarta Provincial Team - Air Fare Province to Jakarta Inland Transport - Regional and Provincial Team OSA (Fixed) - Regional Team OSA (Fixed) - Provincial Team
Unit Rate [IDR]
Vol.
457.600.000 3 3
Management Fee 10 % of [7.1 + 7.2]
8,2 8.2.1 8.2.2 8.2.3 8.2.4 8.2.5
AMENDMENT NO. 6
Amount [IDR]
27 -
(rental) (rental) (rental) (rental) (rental)
7 7,1 7.1.1 7.1.2 7,2 7.2.1
Unit Rate [IDR] 4 6.500.000 8.000.000
3 1 3 1 3 3
year year year year year year
x x x x
Palembang - Bengkulu [via Jakarta] Palembang - Jambi [via Jakarta] Palembang - Pangkal Pinang Pelambang - Lampung [via Jakarta] Bengkulu - Jambi [via Jakarta] Pangkal Pinang - Lampung [via Jakarta]
2 5 2 5 2 6
time time time time time time
x x x x x x
22 22 3 3 1 1
district district prov prov region region
4 4 4 4 3 3
pers pers pers pers pers pers
x x x x x x
3 3 3 3 3 3
years years years years years years
x x x x x x
x x x x x x
2 2 3 3 4 4
2 2 2 2 2 2
time time time time time time
pers pers pers pers pers pers
x x x x x x
2 2 2 2 2 2
days days days days days days
528
200.000
105.600.000
108
250.000
27.000.000
48
24 24 24 24 18 18
250.000
1.770.000 4.420.000 3.060.000 2.580.000 4.750.000 3.480.000
Management Fee 10 % of [8.3.2]
12 12
pers pers
x x
3 3
years years
x x
2 2
time time
72 72
200.000 200.000
72 162
300.000 300.000
7.020.000
440
200.000
88.000.000
90
250.000
22.500.000
144
250.000
36.000.000
24 24 24 24 18 18
1.770.000 4.420.000 3.060.000 2.580.000 4.750.000 3.480.000
42.480.000 106.080.000 73.440.000 61.920.000 85.500.000 62.640.000
21.600.000 48.600.000
ceiling rate ceiling rate
7.020.000
-
-
-
440
200.000
88.000.000
fixed rate
90
250.000
22.500.000
fixed rate
144
250.000
36.000.000
fixed rate
-
1.770.000 4.420.000 3.060.000 2.580.000 4.750.000 3.480.000
-
12.000.000
42.480.000 106.080.000 73.440.000 61.920.000 85.500.000 62.640.000 43.206.000
Bengkulu Jambi
21.600.000 48.600.000
14.400.000 14.400.000
(24) (24) (24) (24) (18) (18)
1.770.000 4.420.000 3.060.000 2.580.000 4.750.000 3.480.000
(42.480.000) (106.080.000) (73.440.000) (61.920.000) (85.500.000) (62.640.000)
43.206.000
72 72
200.000 200.000
14.400.000 14.400.000
ceiling ceiling ceiling ceiling ceiling ceiling
rate rate rate rate rate rate
-
(72) (72)
200.000 200.000
(14.400.000) (14.400.000)
-
200.000 200.000
-
ceiling rate ceiling rate
ORIGINAL CONTRACT
36 36
Unit Rate [IDR] 4 200.000 200.000
1.044
200.000
NO.
DESCRIPTION
Vol.
1
2
3
c d e
District Team District Team District Team
8.3.4.
OSA (Fixed)
Pangkal Pinang Lampung Sumsel
6 6 10
pers pers pers
x x x
3 3 3
years years years
348 408
trip trip
x x
3 3
days days
x x x
2 2 2
time time time
Management Fee 10 % of [8.3.3 + 8.3.4] 8,4 OJT Fasilitator 8.4.1 Training Material + Kit 8.4.2
8,5 8.5.1 8.5.2 8.5.3 8.5.4 8.5.5 8.5.6
8.5.1
time time time time
x
2 2 2 2 2 2
time time time time time time
Pelatihan Kader BPSPAM dalam rangka keberlanjutan Lokasi 2013 2013 Sumatra Selatan (OKI, OKUS, OKUT, Ogan Ilir, Muara Enim, Lahat, Musi Rawas, Musi Banyuasin) Paket Fullboard dan Fullday Fullboard Peserta 1 Fullboard Pemandu 1
time time
Pelatihan Penguatan BPSPAM di Kabupaten Paket Fullboard Participant Paket Fullday for DPMU + TKK Uang Saku Participant Transport Training Material + Kit Spanduk
Paket Fullday DPMU Pakem
8.5.2
8.5.3
5 7.200.000 7.200.000
Vol.
Unit Rate [IDR]
3 2 3 2
years years years years
x x
1
time
Uang Saku Uang Saku Peserta Uang Saku Pemandu
1 1
time time
Transportation Transport Peserta Transport Pemandu
1 1
training kit and material spanduk
22 22 22 22
district district district district
x
x x x x x x
22 22 22 22 22 22
district district district district district district
x x
8 8
district district
x
x
8
district
x x
8 8
district district
time time
x
8 8
1 1
time time
x
Lokasi 2014 2014 Sumatra Selatan Paket Fullboard Fullboard Peserta Fullboard Pemandu Tambahan Fullboard Pemandu (OKU, Empat Lawang) Paket Fullday DPMU Pakem
1 1 1 1
time time time time
x x
Uang Saku Uang Saku Peserta Uang Saku Pemandu Tambahan Uang Saku Pemandu (OKU, Empat Lawang)
1 1 1
time time time
x x
Transportation Transport Peserta Transport Pemandu Tambahan Transport Pemandu (OKU, Empat Lawang)
1 1 1
time time time
training kit and material spanduk
1 1
time time
2014 - Bengkulu Paket Fullboard Fullboard Peserta Fullboard Pemandu Tambahan Fullboard Pemandu Paket Fullday for DPMU Pakem
1 1 1 1
Uang Saku Uang Saku Peserta Uang Saku Pemandu Tambahan Uang Saku Pemandu
6 6 6 6
pers pers pers pers
x
x x x x x x
25 2 25 25 2 25
pers pers pers pers unit pers
x x
288 2
pers pers
x
x
2
pers
day day day day
2.376
40.000
95.040.000
2.376
35.000
83.160.000
x x x
4 4 4
days days days
4.400 352 4.400 1.100 88 1.100
x x
4 4
days days
x
Unit Rate [IDR]
Vol.
Amount [IDR]
Remarks
200.000 200.000 200.000
7.200.000 7.200.000 12.000.000
(36) (36) (60)
200.000 200.000 200.000
(7.200.000) (7.200.000) (12.000.000)
-
200.000 200.000 200.000
-
6 ceiling rate ceiling rate ceiling rate
1.224
200.000
244.800.000
(1.224)
200.000
(244.800.000)
-
200.000
-
ceiling rate ceiling rate
30.000.000
-
1.584
40.000
63.340.000
1.584
35.000
55.440.000
-
-
fixed rate 1.584 1.584
40.000 35.000
63.340.000 fixed rate 55.440.000
880.000.000 35.200.000 220.000.000 110.000.000 12.320.000 110.000.000
fixed rate fixed rate ceiling rate ceiling rate ceiling rate ceiling rate
1.152
200.000
230.400.000
1.152
200.000
230.400.000
64
200.000
12.800.000
64
200.000
12.800.000
64
100.000
6.400.000
64
100.000
6.400.000
1.152 64
100.000
1.152
115.200.000 9.600.000
days
288 2
pers pers
150.000
115.200.000 9.600.000
64
100.000 150.000
district district
x
288 2
pers pers
288 16
100.000 200.000 200.000
28.800.000 3.200.000
288 200.000 16
100.000 200.000
28.800.000 3.200.000
8 8
district district
x x
288 2
pers unit
288 16
100.000 140.000
28.800.000 2.240.000
288 16
100.000 140.000
28.800.000 2.240.000
10 10 2 10
district district district district
x x x x
228 2 2 2
pers pers pers pers
x x x x
4 4 4 4
days days days days
912 80 8 80
200.000 200.000 200.000 100.000
182.400.000 16.000.000 1.600.000 8.000.000
912 80 8 80
200.000 200.000 200.000 100.000
182.400.000 16.000.000 1.600.000 8.000.000
10 10 2
district district district
x x x
228 2 2
pers pers pers
x x x
5 5 5
days days days
1.140 10 10
100.000 150.000 150.000
114.000.000 1.500.000 1.500.000
1.140 10 10
100.000 150.000 150.000
114.000.000 1.500.000 1.500.000
10 10 2
district district district
x x
228 2 2
pers pers pers
228 2 2
100.000 100.000 200.000
22.800.000 200.000 400.000
228 2 2
100.000 100.000 200.000
22.800.000 200.000 400.000
x
10 10
district district
x x
228 2
pers unit
228 20
100.000 140.000
22.800.000 2.800.000
228 20
100.000 140.000
22.800.000 2.800.000
time time time time
x x x x
4 4 4 4
district district district district
x x x x
80 2 1 2
pers pers pers pers
x x x x
4 4 4 4
days days days days
320 32 16 8
200.000 200.000 200.000 100.000
64.000.000 6.400.000 3.200.000 800.000
320 32 16 8
200.000 200.000 200.000 100.000
64.000.000 6.400.000 3.200.000 800.000
1 1 1
time time time
x x x
4 4 4
district district district
x x x
80 2 1
pers pers pers
x x x
4 4 4
days days days
320 32 16
100.000 150.000 150.000
32.000.000 4.800.000 2.400.000
320 32 16
100.000 150.000 150.000
32.000.000 4.800.000 2.400.000
Transportation Transport Peserta Transport Pemandu Tambahan Transport Pemandu
1 1 1
time time time
x x
4 4 4
district district district
x x
80 2 1
pers pers pers
80 8 4
100.000 400.000 400.000
8.000.000 3.200.000 1.600.000
80 8 4
100.000 400.000 400.000
8.000.000 3.200.000 1.600.000
training kit and material spanduk
1 1
time time
x
4 4
district district
x x
80 2
pers unit
80 8
100.000 140.000
8.000.000 1.120.000
80 8
100.000 140.000
8.000.000 1.120.000
x
4 4
AMENDMENT NO. 7 Amount [IDR]
x x
x
x x
4
200.000 100.000 50.000 100.000 140.000 100.000
Unit Rate [IDR]
Vol.
208.800.000
1 1 1 1
x
VARIANT
Amount [IDR]
36 36 60
25.200.000
6 6 6 6
Meals, Snack
AMENDMENT NO. 6
Amount [IDR]
days days
ORIGINAL CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
8.5.3
8.5.4.
8.5.5.
2014 - Jambi Paket Fullboard Fullboard Peserta Fullboard Pemandu Tambahan Fullboard Pemandu (Kerinci, Merangin, Sarolangun, Bungo) Paket Fullday for DPMU Pakem
1 1 1 1
time time time time
Uang Saku Uang Saku Peserta Uang Saku Pemandu Tambahan Uang Saku Pemandu (Kerinci, Merangin, Sarolangun, Bungo)
1 1 1
time time time
Transportation Transport Peserta Transport Pemandu Tambahan Transport Pemandu (Kerinci, Merangin, Sarolangun, Bungo)
1 1 1
time time time
training kit and material spanduk
1 1
2014 - Lampung Paket Fullboard Fullboard Peserta Fullboard Pemandu Tambahan Fullboard Pemandu (Tanggamus, Lampung Selatan) Paket Fullday for DPMU Pakem
Unit Rate [IDR] 4
Vol.
Unit Rate [IDR]
VARIANT
Amount [IDR]
Unit Rate [IDR]
Vol.
AMENDMENT NO. 7 Amount [IDR]
Unit Rate [IDR]
Vol.
Amount [IDR]
Remarks
5
6
4 4 4 4
district district district district
x x x x
68 2 1 2
pers pers pers pers
x x x x
4 4 4 4
days days days days
272 32 4 8
200.000 200.000 200.000 100.000
54.400.000 6.400.000 800.000 800.000
272 32 4 8
200.000 200.000 200.000 100.000
54.400.000 6.400.000 800.000 800.000
4 4 4
district district district
x x x
68 2 1
pers pers pers
x x x
4 4 4
days days days
272 32 4
100.000 150.000 150.000
27.200.000 4.800.000 600.000
272 32 4
100.000 150.000 150.000
27.200.000 4.800.000 600.000
x x
4 4 4
district district district
x x
68 2 1
pers pers pers
68 8 4
100.000 275.000 275.000
6.800.000 2.200.000 1.100.000
68 8 4
100.000 275.000 275.000
6.800.000 2.200.000 1.100.000
time time
x
4 4
district district
x x
68 2
pers unit
68 8
100.000 140.000
6.800.000 1.120.000
68 8
100.000 140.000
6.800.000 1.120.000
1 1 1 1
time time time time
x x x
4 4 4 4
district district district district
x x x x
40 2 1 2
pers pers pers pers
x x x x
4 4 4 4
days days days days
160 32 16 8
200.000 200.000 200.000 100.000
32.000.000 6.400.000 3.200.000 800.000
160 32 16 8
200.000 200.000 200.000 100.000
32.000.000 6.400.000 3.200.000 800.000
Uang Saku Uang Saku Participant Uang Saku Pemandu Tambahan Uang Saku Pemandu (Tanggamus, Lampung Selatan)
1 1 1
time time time
x x
4 4 4
district district district
x x x
40 2 1
pers pers pers
x x x
4 4 4
days days days
160 32 16
100.000 150.000 150.000
16.000.000 4.800.000 2.400.000
160 32 16
100.000 150.000 150.000
16.000.000 4.800.000 2.400.000
Transportation Transport Peserta Transport Pemandu Tambahan Transport Pemandu (Tanggamus, Lampung Selatan)
1 1 1
time time time
x x
4 4 4
district district district
x x
40 2 1
pers pers pers
40 8 4
100.000 500.000 500.000
4.000.000 4.000.000 2.000.000
40 8 4
100.000 500.000 500.000
4.000.000 4.000.000 2.000.000
training kit and material spanduk
1 1
time time
x
4 4
district district
x x
40 2
pers unit
40 8
100.000 140.000
4.000.000 1.120.000
40 8
100.000 140.000
4.000.000 1.120.000
2014 - Bangka Belitung Paket Fullboard Fullboard Peserta Fullboard Pemandu Tambahan Fullboard Pemandu (Bangka) Paket Fullday for DPMU Pakem
1 1 1 1
time time time time
x x x
2 2 1 2
district district district district
x x x x
28 1 1 2
pers pers pers pers
x x x x
4 4 4 4
days days days days
112 8 4 8
200.000 200.000 200.000 100.000
22.400.000 1.600.000 800.000 800.000
112 8 4 8
200.000 200.000 200.000 100.000
22.400.000 1.600.000 800.000 800.000
Uang Saku Uang Saku Participant Uang Saku Pemandu Tambahan Uang Saku Pemandu (Bangka)
1 1 1
time time time
x x
2 2 1
district district district
x x x
28 1 1
pers pers pers
x x x
4 4 4
days days days
112 8 4
100.000 150.000 150.000
11.200.000 1.200.000 600.000
112 8 4
100.000 150.000 150.000
11.200.000 1.200.000 600.000
Transportation Transport Peserta Transport Pemandu Tambahan Transport Pemandu (Bangka)
1 1 1
time time time
x x
2 2 1
district district district
x x
28 1 1
pers pers pers
28 2 1
100.000 1.000.000 1.000.000
2.800.000 2.000.000 1.000.000
28 2 1
100.000 1.000.000 1.000.000
2.800.000 2.000.000 1.000.000
training kit and material spanduk
1 1
time time
x
2 2
district district
x x
28 2
pers unit
28 4
100.000 140.000
2.800.000 560.000
28 4
100.000 140.000
2.800.000 560.000
x x
x
Management Fee 10 % of [8.5.3 + 8.5.4 )+ ............+ 8.5.14] 8,6 8.6.1 8.6.2 8.6.3 8.6.4 8.6.5 8.6.6
AMENDMENT NO. 6
Amount [IDR]
Pelatihan Kader AMPL in District Paket Fullboard Participant Paket Fullday for DPMU + TKK Uang Saku Participant Transport Participant Training Material + Kit Spanduk
45.232.000
2 2 2 2 2 2
time time time time time time
x x x x x x
22 22 22 22 22 22
district district district district district district
x x x x x x
25 2 25 25 2 25
pers pers pers pers unit pers
x x x
4 4 4
days days days
4.400 352 4.400 1.100 88 1.100
200.000 100.000 50.000 100.000 140.000 100.000
Management Fee 10 % of (8.6.3 + 8.6.4 + .... + 8.6.10) 8,7 Workshop RAD AMPL Workshop RAD AMPL Workshop RAD AMPL
time time
x x
22 22
district district
50 50
pers pers
x x
3 1
years years
132
5.000.000
Management Fee 10 % of [8.7]
2
Uang Transport Participant
3
Training Material + Kit
3.519 264 3.916 616 22 1.074
200.000 100.000 50.000 100.000 140.000 100.000
45.232.000
2 2
8,8 Workshop Forum/Asosiasi BPSPAM in Province 1 Paket Fullboard Participant + DPMU + TKK
880.000.000 35.200.000 220.000.000 110.000.000 12.320.000 110.000.000
52.606.000
660.000.000
66.000.000
2 1 2 1 2
time time time time time
x x x x x
22 22 22 22 22
district district district district district
x x x x x
5 5 5 5 5
pers pers pers pers pers
x x
2 2
days days
703.800.000 26.400.000 195.818.667 61.637.334 3.080.000 107.400.000
-
(3.519) (264) (3.916) (616) (22) (1.074)
200.000 100.000 50.000 100.000 140.000 100.000
36.793.600
44
5.000.000 5.000.000
220.000.000 22.000.000
(703.800.000) (26.400.000) (195.818.667) (61.637.334) (3.080.000) (107.400.000)
52.606.000
-
200.000 100.000 50.000 100.000 140.000 100.000
(36.793.600)
-
-
-
-
fixed rate fixed rate ceiling rate ceiling rate ceiling rate ceiling rate
-
44
5.000.000
220.000.000
ceiling rate
22.000.000
440
200.000
88.000.000
fixed rate
220
200.000
44.000.000
ceiling rate
220
100.000
22.000.000
ceiling rate
1
ORIGINAL CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
4
1 2 1
Spanduk
time time time
x x x
22 22 22
district district district
x x x
5 2 2
pers unit unit
Unit Rate [IDR] 4
88
140.000
3 3 3 3
time time time time
x x x x
22 22 22 22
district district district district
x x x x
3 3 3 2
pers pers pers unit
8.10.2 8.10.3
4 4 2 10 2 264 264
district district district district district trip trip
x x x x x x x
4 4 4 4 4 2 3
trip trip trip trip trip days days
x x x x x
3 3 3 3 3
x
4
days
792 198 198 132
200.000 200.000 100.000 140.000
years years years years years
48 48 24 120 24 528 792
200.000 200.000 200.000 200.000 200.000 200.000 200.000
Management Fee 10 % of [8.10.1 + 8.10.2 + 8.10.3] 8,11 Printing / Media: 8.11.1 Spanduk Spanduk 8.11.2 Poster Poster 8.11.3 Leaflet Leaflet 8.11.4 Biaya pengiriman
2 2 10 10 4 4
theme theme theme theme theme theme
x x x x x x
district x x x x x x
2 2 5 5 25 25
22 22 22 22
Unit Rate [IDR]
Vol.
Amount [IDR]
Remarks 6
-
-
158.400.000 39.600.000 19.800.000 18.480.000
fixed rate ceiling rate ceiling rate ceiling rate
9.600.000 9.600.000 4.800.000 24.000.000 4.800.000 105.600.000 158.400.000
-
64 64 32 140 32 664 996
200.000 200.000 200.000 200.000 200.000 200.000 200.000
-
12.800.000 12.800.000 6.400.000 28.000.000 6.400.000 132.800.000 199.200.000 39.840.000
-
64 64 32 140 32 664 996
200.000 200.000 200.000 200.000 200.000 200.000 200.000
-
12.800.000 12.800.000 6.400.000 28.000.000 6.400.000 132.800.000 199.200.000
x x x x
5 5 5 5
5 5 5 5
x x x x
5 5 5 5
x x x x
2 2 2 2
736 808 21.100 22.900 37.880 TRUE
150.000
110.400.000
5.000
105.500.000
1.000
808
150.000
121.200.000
808
150.000
121.200.000
22.900
5.000
114.500.000
22.900
5.000
114.500.000
1.000 253.780.000
41.480.000 38.067.000
41.480 15%
1.000 253.780.000
41.480.000 38.067.000
fixed rate
37.880.000
fixed rate 41.480 15%
281.533.000
233.808.600
121.466.000
pers pers pers pers pers pers pers
x x x x x x x
5 5 5 5 5 5 5
day day day day day day day
5 25 5 5 10 15 345
120.000 100.000 120.000 100.000 100.000 120.000 100.000
600.000 2.500.000 600.000 500.000 1.000.000 1.800.000 34.500.000
5 25 5 5 10 15 345
120.000 100.000 120.000 100.000 100.000 120.000 100.000
600.000 2.500.000 600.000 500.000 1.000.000 1.800.000 34.500.000
9,2 Transportation a. Tickets - Central Government - Advisory CPMU - Pemandu Asosiasi (MURA, OKUS dan OKUT) - Participants Palembang (Transport lokal)
1 1 3 69
pers pers pers pers
x x x x
1 1 1 1
trip trip trip trip
1 1 3
2.120.000 2.120.000 300.000
2.120.000 2.120.000 900.000
1 1 3
2.120.000 2.120.000 300.000
2.120.000 2.120.000 900.000
2 5 2 69 8 9 9 9 9 9 8 8
pers pers pers pers pers pers pers pers pers pers pers pers
x x x x x x x x x x x x
1 1 1 1 1 1 1 1 1 1 1 1
trip trip trip trip trip trip trip trip trip trip trip trip
2 5 2
500.000 250.000 200.000
1.000.000 1.250.000 400.000
2 5 2
500.000 250.000 200.000
1.000.000 1.250.000 400.000
8 9 9 9 9 9 8 8
300.000 200.000 250.000 200.000 200.000 100.000 250.000 300.000
2.400.000 1.800.000 2.250.000 1.800.000 1.800.000 900.000 2.000.000 2.400.000
8 9 9 9 9 9 8 8
300.000 200.000 250.000 200.000 200.000 100.000 250.000 300.000
2.400.000 1.800.000 2.250.000 1.800.000 1.800.000 900.000 2.000.000 2.400.000
1 1
pers pers
x x
4 4
day day
4 4
325.000 325.000
1.300.000 1.300.000
4 4
325.000 325.000
1.300.000 1.300.000
5 69 1
pers pers pers
x x x
4 4 4
day day day
20 276 4
325.000 325.000 325.000
6.500.000 89.700.000 1.300.000
20 276 4
325.000 325.000 325.000
6.500.000 89.700.000 1.300.000
5
pers
x
4
day
20
200.000
4.000.000
20
200.000
4.000.000
75
set
75
200.000
15.000.000
75
200.000
15.000.000
1
2.000.000
2.000.000
1
2.000.000
2.000.000
9.4
Fullday Package - Provincial Government
9.5
Training Kit + Training Material
9.6
Stationery
9.7
Equipment
196.040.000
(36.793.600)
1 5 1 1 2 3 69
Fullboard Package a. Central - Central Government - Advisor CPMU b. Local Participants - Pemandu Asosiasi (Regional & District) - Participants (Pengurus Asosiasi/SKPD Asosiasi/DC/FK) c. Panitia Lokal
1
ls
rate rate rate rate rate rate rate
39.840.000
9 PROVINCIAL TRAINING for DISTRICT ASSOSIATION 9,1 Perdiem - Central Government - Provincial Government - Advisory CPMU - Panitia Lokal - Pemandu Asosiasi (Palembang) - Pemandu Asosiasi (MURA, OKUS dan OKUT) - Participants Palembang (Pengurus Asosiasi/SKPD Asosiasi/DC/FK)
b. Inland/Lokal Transport - Taxi (pp) for Central Government - Provincial Government - Pemandu Asosiasi (Palembang) - Participants Palembang (Pengurus Asosiasi/SKPD Asosiasi/DC/FK) Musi Rawas - Palembang (pp) Musi Banyuasin - Palembang (pp) Lahat - Palembang (pp) Muara Enim - Palembang (pp) Ogan Komering Ilir - Palembang (pp) Ogan Ilir - Palembang (pp) Ogan Komering Ulu Timur (pp) Ogan Komering Ulu Selatan (pp)
ceiling ceiling ceiling ceiling ceiling ceiling ceiling
province
Total Management Fee Training Activity [8.1 + 8.2 + 8.3.1 + 8.3.2 + 8.5 + 8.6 + 8.7 + 8.8 + 8.9 + 8.10 )
9.3
AMENDMENT NO. 7 Amount [IDR]
ceiling rate
31.680.000 village 184 202 184 202 184 202
Unit Rate [IDR]
12.320.000
7.788.000
District Team -District to Province for Coordnator Meeting Inland Transport District Coordinator Bengkulu District Coordinator Jambi District Coordinator Babel District Coordinator Sumsel District Coordinator Lampung Acomodation OSA (Fixed)
Vol.
5
7.832.000
Pelatihan Pengelola Program Kabupaten (DPMU+TKK+Satker) in Province Paket Fullboard Participant Uang Transport Participant Training Material + Kit Spanduk
VARIANT
Amount [IDR]
1
Management Fee 10 % of [8.9.2 + 8.9.3 + 8.9.4] 8. 10 8.10.1
Unit Rate [IDR]
Vol.
1
Management Fee 10 % of [8.8.2 + 8.8.3 + 8.8.4] 8,9 8.9.1 8.9.2 8.9.3 8.9.4
AMENDMENT NO. 6
Amount [IDR]
-
196.040.000
ORIGINAL CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
9.8
Unit Rate [IDR] 4
AMENDMENT NO. 6
Amount [IDR]
Unit Rate [IDR]
Vol.
VARIANT
Amount [IDR]
Vol.
Unit Rate [IDR]
AMENDMENT NO. 7 Amount [IDR]
Unit Rate [IDR]
Vol.
Amount [IDR]
5
6
a. Horizontal Banner b. Additional Classroom c. Preparation Meeting (Snack & Lunch) d. Car Rental e. Computer/Laptop Rental f. Printer Rental
2 1 6 1 1 1
unit unit set unit unit unit
x x x x x x
1 2 2 5 5 5
set day set day day day
2 2 12 5 5 5
250.000 1.500.000 50.000 580.000 300.000 300.000
Training Report
1
set
x
3
set
3
100.000
Management Fee 10 % of [9.1 s/d 9.8]
500.000 3.000.000 600.000 2.900.000 1.500.000 1.500.000
2 2 12 5 5 5
250.000 1.500.000 50.000 580.000 300.000 300.000
300.000
3
100.000
500.000 3.000.000 600.000 2.900.000 1.500.000 1.500.000 300.000
19.604.000
19.604.000
1.203.000.000
1.203.000.000
10 FACILITATOR FK & FM 10,1 Remunerasi FK ( Jan - Aprl 2014 ) - Jambi - Sumatera Selatan - Bengkulu - Lampung - Bangka Belitung
4 16 4 2 2
pers pers pers pers pers
x x x x x
4 -
month month month month month
FM ( Jan - Mart 2014 ) - Jambi - Jambi - Sumatera Selatan - Bengkulu - Lampung - Bangka Belitung
8 2 47 8 4 3
pers pers pers pers pers pers
x x x x x x
3 3 3 3 3 3
month month month month month month
FM ( Aprl 2014 ) - Jambi - Jambi - Sumatera Selatan - Sumatera Selatan - Bengkulu - Lampung - Bangka Belitung
20 2 56 47 24 12 14
pers pers pers pers pers pers pers
x x x x x x x
1 1 1 1 1 1 1
month month month month month month month
64
6.000.000
384.000.000
64
6.000.000
384.000.000
6 141
3.250.000 3.250.000
19.500.000 458.250.000
6 141
3.250.000 3.250.000
19.500.000 458.250.000
12 9
3.250.000 3.250.000
39.000.000 29.250.000
12 9
3.250.000 3.250.000
39.000.000 29.250.000
2 56 -
3.250.000 3.250.000 -
6.500.000 182.000.000 -
2 56 -
3.250.000 3.250.000 -
6.500.000 182.000.000 -
12 14
3.250.000 3.250.000
39.000.000 45.500.000
12 14
3.250.000 3.250.000
39.000.000 45.500.000
Management Fee 15 % of [10.1] 10,2 Biaya Operasional FM ( Jan - Mart 2014 ) - Jambi - Jambi - Sumatera Selatan - Bengkulu - Lampung - Bangka Belitung
8 2 47 8 4 3
pers pers pers pers pers pers
x x x x x x
3 3 3 3 3 3
month month month month month month
20 2 56 47 24 12 14
pers pers pers pers pers pers pers
x x x x x x x
1 1 1 1 1 1 1
month month month month month month month
10,3 Biaya Perjalanan Dinas FK ( Jan - Aprl 2014 ) - Jambi - Sumatera Selatan - Bengkulu - Lampung - Bangka Belitung
4 16 4 2 2
pers pers pers pers pers
x x x x x
4 -
month month month month month
FM ( Jan - Mart 2014 ) - Jambi - Jambi - Sumatera Selatan - Bengkulu - Lampung - Bangka Belitung
8 2 47 8 4 3
pers pers pers pers pers pers
x x x x x x
3 3 3 3 3 3
month month month month month month
FM ( Aprl 2014 ) - Jambi - Jambi - Sumatera Selatan - Sumatera Selatan - Bengkulu - Lampung - Bangka Belitung
20 2 56 47 24 12 14
pers pers pers pers pers pers pers
x x x x x x x
1 1 1 1 1 1 1
month month month month month month month
FM ( Aprl 2014 ) - Jambi - Jambi - Sumatera Selatan - Sumatera Selatan - Bengkulu - Lampung - Bangka Belitung
Remarks
180.450.000
180.450.000
60.750.000
60.750.000
6 141
250.000 250.000
1.500.000 35.250.000
6 141
250.000 250.000
1.500.000 35.250.000
12 9
250.000 250.000
3.000.000 2.250.000
12 9
250.000 250.000
3.000.000 2.250.000
2
250.000
500.000
2
250.000
500.000
47
250.000
11.750.000
47
250.000
11.750.000
12 14
250.000 250.000
3.000.000 3.500.000
12 14
250.000 250.000
3.000.000 3.500.000
71.050.000
71.050.000
6 141
300.000 250.000
1.800.000 35.250.000
6 141
300.000 250.000
1.800.000 35.250.000
12 9
200.000 400.000
2.400.000 3.600.000
12 9
200.000 400.000
2.400.000 3.600.000
20
300.000
6.000.000
20
300.000
6.000.000
56
250.000
14.000.000
56
250.000
14.000.000
12 14
200.000 400.000
2.400.000 5.600.000
12 14
200.000 400.000
2.400.000 5.600.000
ORIGINAL CONTRACT NO.
DESCRIPTION
Vol.
1
2
3
Unit Rate [IDR] 4
AMENDMENT NO. 6
Amount [IDR]
Vol.
Unit Rate [IDR]
Vol.
Unit Rate [IDR]
Vol.
Unit Rate [IDR]
Amount [IDR]
Remarks 6
13.180.000
13.180.000
-
-
-
1 1
x x
1 1
month month
ceilling rate ceilling rate
SUMATERA SELATAN Ogan Komering Ilir Muara Enim Lahat Musi Rawas Musi Banyuasin Ogan Komering Ulu Selatan Ogan Komering Ulu Timur Ogan Ilir Empat Lawang
3 2 2 4 4 2 2 2 1
x x x x x x x x x
1 1 1 1 1 1 1 1 1
month month month month month month month month month
ceilling ceilling ceilling ceilling ceilling ceilling ceilling ceilling ceilling
BENGKULU Bengkulu Selatan Rejang Lebong Kaur
1 1 1
x x x
1 1 1
month month month
ceilling rate ceilling rate ceilling rate
Management Fee 15 % of [10.4] 10,5 Biaya Operasioal Fasilitator (FM dan FK) Pamsimas II Biaya Operasional
27
x
1
10,4 Gaji Fasilitator (FM dan FS) Pamsimas III Fasilitator Masyarakat Jambi Kepulauan Bangka Belitung Sumatera Selatan Bengkulu Lampung Fasilitator Senior Jambi Kepulauan Bangka Belitung Sumatera Selatan Bengkulu Lampung
-
-
-
-
-
-
-
-
-
month
-
4.210.000.000
4.210.000.000
90 33 171 75 108
x x x x x
2 2 2 2 2
month month month month month
180 66 342 150 216
3.500.000 3.500.000 3.500.000 3.500.000 3.500.000
630.000.000 231.000.000 1.197.000.000 525.000.000 756.000.000
180 66 342 150 216
3.500.000 3.500.000 3.500.000 3.500.000 3.500.000
630.000.000 231.000.000 1.197.000.000 525.000.000 756.000.000
ceilling ceilling ceilling ceilling ceilling
rate rate rate rate rate
13 6 23 11 14
x x x x x
2 2 2 2 2
month month month month month
26 12 46 22 28
6.500.000 6.500.000 6.500.000 6.500.000 6.500.000
169.000.000 78.000.000 299.000.000 143.000.000 182.000.000
26 12 46 22 28
6.500.000 6.500.000 6.500.000 6.500.000 6.500.000
169.000.000 78.000.000 299.000.000 143.000.000 182.000.000
ceilling ceilling ceilling ceilling ceilling
rate rate rate rate rate
ceilling ceilling ceilling ceilling ceilling
rate rate rate rate rate
Management Fee 15 % of [10.6] 10,5 Biaya Operasioal Fasilitator (FM dan FS) Pamsimas III Jambi Kepulauan Bangka Belitung Sumatera Selatan Bengkulu Lampung
rate rate rate rate rate rate rate rate rate
ceilling rate
Management Fee 10 % of [10.5]
631.500.000
103 39 194 86 122
x x x x x
2 2 2 2 2
month month month month month
206 78 388 172 244
Management Fee 10 % of [10.7] 11
AMENDMENT NO. 7 Amount [IDR]
5
Management Fee 10 % of [10.2 + 10.3] 10,4 Gaji Fasilitator (FM dan FK) Pamsimas II JAMBI Kerinci Merangin
VARIANT
Amount [IDR]
811.000 811.000 750.000 792.000 811.000
-
COST TO THE DISTRICT ASSOCIATION (TF 094792]
855.432.000 167.066.000 63.258.000 291.000.000 136.224.000 197.884.000
631.500.000
206 78 388 172 244
811.000 811.000 750.000 792.000 811.000
85.543.200
855.432.000 167.066.000 63.258.000 291.000.000 136.224.000 197.884.000 85.543.200
220.000.000
220.000.000
[detail of estimated are attached]
170.000.000
170.000.000
[detail of estimated are attached]
50.000.000
50.000.000
11,1 Cost of "Basic Program" -South Sumatera Province [8 District] 11,2 Cost of "Pilot Program" (District Muara Enim) Management Fee 10 % of [11] 12 12,1 12,2 12,3 12,4 12,5 12,6 12,7 12,8 12,9
REPORTING Inception Report Monthly Report Quarterly Report Special Report Annual Report Financial Management Report (FMR) Draft Final Report Final Report Training Program Report
22.000.000
1 9 3 3 3 3 1 1 5
time time time time time time time time theme
x x
3 3
years years
x
3
years
x x x x x x x x
20 20 20 20 20 20 20 15
copies copies copies copies copies copies copies copies
=
3
month
25 540 180 60 60 60 20 20 225
48.000 50.000 75.000 100.000 100.000 50.700 100.000 150.000 250.000
117.992.000 1.200.000 27.000.000 13.500.000 6.000.000 6.000.000 3.042.000 2.000.000 3.000.000 56.250.000
25 540 180 60 60 60 20 20 225
48.000 50.000 75.000 100.000 100.000 50.700 100.000 150.000 250.000
117.992.000 1.200.000 27.000.000 13.500.000 6.000.000 6.000.000 3.042.000 2.000.000 3.000.000 56.250.000
ceiling rate
22.000.000 27.150.000 543
50.000
27.150.000
25 543 180 60 60 60 20 20 225
48.000 50.000 75.000 100.000 100.000 50.700 100.000 150.000 250.000
118.142.000 1.200.000 27.150.000 13.500.000 6.000.000 6.000.000 3.042.000 2.000.000 3.000.000 56.250.000
fixed rate fixed rate fixed rate fixed rate fixed rate fixed rate fixed rate fixed rate fixed rate
APPENDIX. E ADVANCE PAYMENT GUARANTEE
( No Change )
134
APPENDIX. F PERFORMANCE BANK GUARANTEE ( No Change )