PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT-MANDIRI PERKOTAAN (PNPM-MP) PROYEK PEMBINAAN KAWASAN PERMUKIMAN DI PERKOTAAN (P2KP) DIREKTORAT JENDERAL CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM & PERUMAHAN RAKYAT Nomor Loan Nama Konsultan
: Integrated Community Driven Development (ICDD) Project - Phase II & III : PT. Surya Abadi Konsultan In Join Venture With PT. Laras Sembada : Jl. Banyu Urip No. 217, Surabaya : (NAD, North Sumatera, West Sumatera, Riau, Riau Island Provinces) : HK.02.03/OC-1/IDB-ICDD/SATKER-PKP/017/2013 - 07 Maret 2013 : Amandemen No.07, tanggal 29 Mei 2015 : 07 Maret 2013 s.d 31 Desember 2015
Alamat Konsultan Propinsi / OC Nomor & Tanggal Kontrak Amandemen Kontrak Periode Kontrak
DESCRIPTION
NO
AMENDEMENT CONTRACT NO. 7
REMUNERATION
39.659.708.000
1.1
PROFESSIONAL STAFF
33.263.665.000
1.2
SUPPORTING STAFF
II
DIRECT REIMBURSABLE COST
2.1
MOBILIZATION / DEMOBILIZATION
2.2
HOUSING ALLOWANCE
2.3
DUTY TRAVEL EXPENSES NAD
2.4
DUTY TRAVEL EXPENSES SUMATERA UTARA
1.350.972.200
2.5
DUTY TRAVEL EXPENSES SUMATERA BARAT
1.400.536.100
2.6
DUTY TRAVEL EXPENSES RIAU
2.7
DUTY TRAVEL EXPENSES KEP. RIAU
2.8
OFFICE OPERATIONAL EXPENSES
2.835.340.605
2.9
OFFICE EQUIPMENT EXPENSES
1.305.200.000
2.10
RENTAL EXPENSES
8.863.490.000
2.11
REPORTING EXPENCES
I
6.396.043.000 18.464.211.475 99.800.000 570.250.000 191.320.950
925.971.720 895.429.900
25.900.000
III
TRAINING ACTIVITY EXPENSES
3.1
Training in Regional Levels
3.2
Training in Provincial Levels
4.744.428.325
3.3
Training in City/Regency Levels
1.908.869.300 4.909.288.900
IV
SOCIALIZATION ACTIVITY EXPENSES
4.1
Socialization Activity in Provincial Levels
4.2
Socialization Activity in City/Regency Levels GRAND TOTAL ( I + II + III + IV )
6.734.226.625 80.929.000
786.899.400 4.122.389.500 69.767.435.000
I. REMUNERATION NO.
NAME
POSITION
AMENDEMENT CONTRACT NO. 7 Vol
Rate
I. 1 PROFESSIONAL STAFF I.1.1
OC LEVEL
A
Program Director
1
Ferry Setyawan, S.Si, M.Si
Program Director
26,5
Ferry Setyawan, S.Si, M.Si
Program Director
7,0
Muhammad Jumhadi, S.Ag
a. Assisten of PD for Consolidation & Reporting
15,7
Imam Asfahani, S.Ag
a. Assisten of PD for Consolidation & Reporting
17,8
Kaharudin M. Usman, SH
b. Assisten of PD for Legal & HCU
15,2
Awaluddin Siregar
b. Assisten of PD for Legal & HCU
17,8
2
3
B B.1
1.596.910.000
Province Level
31.666.755.000
Propinsi NAD (Banda Aceh)
2.122.690.000
1
Drs. Benny Supriyadi
Provincial Team Leader
5,5
2
Arif, SP
Monev Specialist
9,5
3
Abu Hasan As'ari, S.Ag
a. Sub Spec. for Monev
5,5
4
Muhammad Abduh, ST
MIS Specialist
8,8
5
Heriyanto, Spd
Socialization Specialist
9,5
6
Mad Enoh, SP
Training Specialist
5,5
Ma'mun Suryana
Training Specialist
4,0
Hendra Asmen, ST
Infrastructure Specialist
5,5
Lisa Afianti
Infrastructure Specialist
4,0
Tursaman, SE
Micro Fin & Fin.Mgmt Spec.
5,5
Yadi Sentosa
Micro Fin & Fin.Mgmt Spec.
4,0
7
8
a.1. Sub Proff. Financial (Community Grand) a.2. Sub Proff. Financial (Community Grand) a.3. Sub Proff. Financial (Community Grand) a.4. Sub Proff. Financial (Community Grand) a.5. Sub Proff. Financial (Community Grand)
9
Lena Afrina
10
Ferry Suryawan
11
Nurhasanah
12
Fahriansyah
13
Dwijayanti
14
Tedy Dermawan
b.1. Sub Proff. Administration (Fix Cost)
9,5
15
Hendra Saputra
b.2. Sub Proff. Administration (Fix Cost)
9,5
16
Hamami, S.Sos
Local Gov & Public Policy Spec
-
Syaifulsyah, SE
Local Gov & Public Policy Spec
8,5
17
Nur Wahidah, SE, M.sc
Livelihood & SME's Specialist
9,5
18
Sabirin Sahputra
Urban Planner Specialist
-
Ary Yondra
Urban Planner Specialist
9,5
B.2 1
2
3
Amount 33.263.665.000
9,5 9,5 9,5 9,5 6,5
Propinsi Sumatera Utara (Medan)
9.659.730.000
Estefanus Wolok, ST
Provincial Team Leader
7,5
Drs. Bajang Achmadi
Provincial Team Leader
18,8
Drs. Bajang Achmadi
Provincial Team Leader
Roby Batubara, ST
Monev Specialist
26,5
Roby Batubara, ST
Monev Specialist
7,0
Awaluddin Siregar, SH
a. Sub Spec. for Monev
7,0
15,7
Remuneration // 2 of 67
NO.
NAME
POSITION
AMENDEMENT CONTRACT NO. 7 Vol
4
5
6
7
8
9
10
11
a. Sub Spec. for Monev
16,5
Zulkifli Siregar, S.Kom
MIS Specialist
26,5
Zulkifli Siregar, S.Kom
MIS Specialist
7,0
Raziza Malindawati, SP
Socialization Specialist
15,7
Taufik Hidayat
Socialization Specialist
17,8
Nurwino Wajib, ST
Training Specialist
26,5
Nurwino Wajib, ST
Training Specialist
7,0
Dra. Roswaty M.Ed.
a. Sub Spec. for Training
-
Rd. Agus Vuttawan
a. Sub Spec. for Training
22,0
Rd. Agus Vuttawan
a. Sub Spec. for Training
7,0
Ir. Syafriadi Ma'aruf
Infrastructure Specialist
26,5
Ir. Syafriadi Ma'aruf
Infrastructure Specialist
7,0
Zulhan Hadi Lubis, ST
a. Sub Spec. for Infrastructure
26,5
Zulhan Hadi Lubis, ST
a. Sub Spec. for Infrastructure
7,0
Samuel Abel Tanta S, SE
Micro Fin & Fin.Mgmt Spec.
26,5
Samuel Abel Tanta S, SE
Micro Fin & Fin.Mgmt Spec.
7,0
Drs. Armin Lubis Drs. Armin Lubis
12
Dewi Astuti Dewi Astuti
13
Tri Febrianti Handayani Lilis Ernawaty Hutagaol, SE Lilis Ernawaty Hutagaol, SE
14
Supriyadi Supriyadi
15
Rita Malpinas Saragi Rita Malpinas Saragi
16
Adi Faomasi Buulolo Adi Faomasi Buulolo
17
Nia Tesalonika Nia Tesalonika
18
Rofiqoh Rofiqoh
19
20
21
Rate
Muliadi Torong
a.1. Sub Proff. Financial (Community Grand) a.1. Sub Proff. Financial (Community Grand) a.2. Sub Proff. Financial (Community Grand) a.2. Sub Proff. Financial (Community Grand) a.3. Sub Proff. Financial (Community Grand) a.3. Sub Proff. Financial (Community Grand) a.3. Sub Proff. Financial (Community Grand) a.4. Sub Proff. Financial (Community Grand) a.4. Sub Proff. Financial (Community Grand) a.5. Sub Proff. Financial (Community Grand) a.5. Sub Proff. Financial (Community Grand) a.6. Sub Proff. Financial (Community Grand) a.6. Sub Proff. Financial (Community Grand) a.7. Sub Proff. Financial (Community Grand) a.7. Sub Proff. Financial (Community Grand) a.8. Sub Proff. Financial (Community Grand) a.8. Sub Proff. Financial (Community Grand)
Amount
26,5 7,0 26,5 7,0 3,5 14,0 7,0 26,5 7,0 26,5 7,0 24,0 7,0 26,5 7,0 26,5 7,0
Erwin Yuswardin Lubis
b.1. Sub Proff. Administration (Fix Cost)
9,0
Nurhijrah, SE
b.1. Sub Proff. Administration (Fix Cost)
17,0
Nurhijrah, SE
b.1. Sub Proff. Administration (Fix Cost)
7,0
Eka Oktarina Pohan
b.2. Sub Proff. Administration (Fix Cost)
26,5
Eka Oktarina Pohan
b.2. Sub Proff. Administration (Fix Cost)
7,0
Susanti, S.Sos., M.Si
Local Gov & Public Policy Spec
15,7
Muhammad Jumhadi, S.Ag
Local Gov & Public Policy Spec
17,8 Remuneration // 3 of 67
NO.
NAME
POSITION
AMENDEMENT CONTRACT NO. 7 Vol
22
23
B.3 1
2
3
4
5
6
7
8
9
Livelihood & SME's Specialist
-
Elly Rahayu
Livelihood & SME's Specialist
25,5
Elly Rahayu
Livelihood & SME's Specialist
7,0
Ary Yondra
Urban Planner Specialist**)
-
Juli Ervina, ST
Urban Planner Specialist**)
15,7
Andi
Urban Planner Specialist**)
-
Nazriansyah
Urban Planner Specialist**)
16,5
Indro Budiono, S.Psi
Provincial Team Leader
15,7
Afriadi, M.Si
Provincial Team Leader
17,8
Joni Hardi, S.Pt
Monev Specialist
15,7
Totok Priyanto, SE
Monev Specialist
17,8
Risyanto Rahman, SH
a. Sub Spec. for Monev
26,5
Risyanto Rahman, SH
a. Sub Spec. for Monev
7,0
H. Zainul Mushoffie, ST
MIS Specialist
-
M. Ali Firman Tri Wibowo, S.MB
MIS Specialist
5,0
Muhammad Abduh
MIS Specialist
17,0
Muhammad Abduh
MIS Specialist
7,0
Robby Hotter
Socialization Specialist
26,5
Robby Hotter
Socialization Specialist
7,0
Zulfadli Muchtar, S.ThI
Training Specialist
9,5
Hendri Matias, S.Sos
Training Specialist
5,6
Zulfadli Muchtar, S.ThI
Training Specialist
17,8
Muslim, ST
Infrastructure Specialist
26,5
Muslim, ST
Infrastructure Specialist
7,0
Roza Hardeni, SE
Micro Fin & Fin.Mgmt Spec.
26,5
Roza Hardeni, SE
Micro Fin & Fin.Mgmt Spec.
7,0
Ferdiansyah
a.1. Sub Proff. Financial (Community Grand) a.1. Sub Proff. Financial (Community Grand) a.2. Sub Proff. Financial (Community Grand) a.2. Sub Proff. Financial (Community Grand) a.3. Sub Proff. Financial (Community Grand) a.3. Sub Proff. Financial (Community Grand) a.3. Sub Proff. Financial (Community Grand) a.4. Sub Proff. Financial (Community Grand) a.4. Sub Proff. Financial (Community Grand) a.5. Sub Proff. Financial (Community Grand) a.5. Sub Proff. Financial (Community Grand)
Propinsi Sumatera Barat (Padang)
Ferdiansyah 10
Rurry Lestarie Rurry Lestarie
11
Yulistia Fatimah Fatimah
12
Arravanco Ascesto Arravanco Ascesto
13
Novriyo Della Akhyar Novriyo Della Akhyar
14
15
16
Rate
Daniel Collyn Damani, SE, MM
Amount
8.434.865.000
26,5 7,0 26,5 7,0 7,5 14,0 7,0 26,5 7,0 26,5 7,0
Naomi De Marcia
b.1. Sub Proff. Administration (Fix Cost)
1,0
Ibrahim Al Hadid
b.1. Sub Proff. Administration (Fix Cost)
24,0
Ibrahim Al Hadid
b.1. Sub Proff. Administration (Fix Cost)
7,0
Nuraisyah
b.2. Sub Proff. Administration (Fix Cost)
26,5
Nuraisyah
b.2. Sub Proff. Administration (Fix Cost)
7,0
Dini Yusron
c.1. Sub Proff. Keuangan Mikro Syariah
Remuneration // 4 of 67
NO.
NAME
POSITION
AMENDEMENT CONTRACT NO. 7 Vol
Rate
M. Ridwan
c.1. Sub Proff. Keuangan Mikro Syariah
14,0
17
Maulana
c.2. Sub Proff. Keuangan Mikro Syariah
14,0
18
M. Ade Fadhillah Assidiq
c.3. Sub Proff. Keuangan Mikro Syariah
-
Islah Milono
c.3. Sub Proff. Keuangan Mikro Syariah
14,0
Ir. Afriadi, M.Si
Local Gov & Public Policy Spec
15,7
Hendri Matias, S.Sos
Local Gov & Public Policy Spec
17,8
Fauzan, SE
Livelihood & SME's Specialist
26,5
Fauzan, SE
Livelihood & SME's Specialist
Lisa Risna, ST
Urban Planner Specialist**)
26,5
Lisa Risna, ST
Urban Planner Specialist**)
7,0
19
20
21
B.4 1
2
3
4
5
6
7
8
Provincial Team Leader
15,7
Muhammad Irfan, ST
Provincial Team Leader
10,8
Muhammad Irfan, ST
Provincial Team Leader
Drs. Sapto Nugroho
Monev Specialist
Drs. Sapto Nugroho
Monev Specialist
Raden Rusdianto, S.Kom
MIS Specialist
19,5
Alamsyah Putra Lubis
MIS Specialist
12,0
Danu Umbara, SE
Socialization Specialist
26,5
Danu Umbara, SE
Socialization Specialist
7,0
Jaja Sumantri, S.Sos
Training Specialist
23,5
Raziza Malindawati
Training Specialist
9,0
Ir. Indra Wijaya
Infrastructure Specialist
26,5
Ir. Indra Wijaya
Infrastructure Specialist
7,0
Ery Kusmedi
Micro Fin & Fin.Mgmt Spec.
15,7
Erfan Ashari
Micro Fin & Fin.Mgmt Spec.
17,8
Mad Saputra Mad Saputra
10
11
12
B.5 1
2
3
5.829.155.000
Totok Priyanto, SE
Nora Diana 9
7,0
Propinsi Riau (Pekanbaru)
Nora Diana
Amount
a.1. Sub Proff. Financial (Community Grand) a.1. Sub Proff. Financial (Community Grand) a.2. Sub Proff. Financial (Community Grand) a.2. Sub Proff. Financial (Community Grand)
7,0 26,5 7,0
26,5 7,0 26,5 7,0
Rusmani Said, SE
Local Gov & Public Policy Spec
26,5
Rusmani Said, SE
Local Gov & Public Policy Spec
7,0
Dewi Sofia
Livelihood & SME's Specialist
25,5
To Be Name
Livelihood & SME's Specialist
7,0
Lola Lolita, ST
Urban Planner Specialist**)
-
To Be Name
Urban Planner Specialist**)
-
Propinsi Kepulauan Riau (Tanjung Pinang)
5.620.315.000
Muhammad Irfan, ST
Provincial Team Leader
15,7
Joni Hardi, S.Pt
Provincial Team Leader
17,8
Danlipasko Timisela, SE
Monev Specialist
26,5
Danlipasko Timisela, SE
Monev Specialist
7,0
Iskandar Nasution, S.Kom.
MIS Specialist
-
Bambang Suryono, S.Kom
MIS Specialist
25,5
Bambang Suryono, S.Kom
MIS Specialist
7,0 Remuneration // 5 of 67
NO.
NAME
POSITION
AMENDEMENT CONTRACT NO. 7 Vol
4
5
6
7
Rate
Suwisnu
Socialization Specialist
6,5
Rudi Rosyidi
Socialization Specialist
19,5
Rudi Rosyidi
Socialization Specialist
7,0
Imam Asfahani, S.Ag
Training Specialist
15,7
Ramdan Muhammad
Training Specialist
17,8
Ir. Ugraneta
Infrastructure Specialist
13,5
Doni Permadi
Infrastructure Specialist
-
Hendra Asmen
Infrastructure Specialist
16,5
Sholihul Hadi, SE
Micro Fin & Fin.Mgmt Spec.
5,5
Oriency P. Sitinjak, SE
Micro Fin & Fin.Mgmt Spec.
9,7
Ery Kusmedi, SE
Micro Fin & Fin.Mgmt Spec.
17,8
Romalisa
26,5
9
Ali Murdani
10
Dadan Somdani, S.Ag, MM
a.1. Sub Proff. Financial (Community Grand) a.1. Sub Proff. Financial (Community Grand) a.2. Sub Proff. Financial (Community Grand) Local Gov & Public Policy Spec
Heru Setyo Budi, SP
Local Gov & Public Policy Spec
25,5
Heru Setyo Budi, SP
Local Gov & Public Policy Spec
7,0
M. Kasim Machmud, SE
Livelihood & SME's Specialist
15,2
Oriency P. Sitinjak, SE
Livelihood & SME's Specialist
17,8
Juli Ervina, ST
Urban Planner Specialist**)
-
To Be Name
Urban Planner Specialist**)
-
8
Romalisa
11
12
7,0 16,0 -
I. 2 SUPPORTING STAFF
6.396.043.000
I.2.1
Program Director
1
Wedia Abdul Halim
Office Manager
26,5
Wedia Abdul Halim
Office Manager
7,0
Asneli Lubis
Secretary
26,5
Asneli Lubis
Secretary
7,0
Achmad Syarifudin
Computer Operator
2,5
Hamsyah Fadli
Computer Operator
3,0
Erwinsyah Harahap
Computer Operator
11,0
Lia Syafrida
Computer Operator
17,0
Bebby Mardhani
Secretary
15,7
Lisa Novita
Secretary
17,8
Ismet Azhar
Computer Operator 1
26,5
Ismet Azhar
Computer Operator 1
7,0
Nikmat
Computer Operator 2
26,5
Nikmat
Computer Operator 2
7,0
Makmur
Office Boy
26,5
Makmur
Office Boy
7,0
Ngadimin
Security
26,5
Ngadimin
Security
7,0
Zuraida Aziz, SP
Ass Office Manager
5,5
Ika Fadilla
Ass Office Manager
4,0
Rizka Ade Putri
Secretary
5,5
2
3
I.2.2 1
2
3
4
5
I.2.3 1
2
Amount
304.300.000
Propinsi Sumatera Utara (Medan)
286.830.000
Propinsi NAD (Banda Aceh)
91.625.000
Remuneration // 6 of 67
NO.
NAME
POSITION
AMENDEMENT CONTRACT NO. 7 Vol
3
4
5
6
I.2.4 1
2
3
4
5
6
I.2.5 1
Rate
Marfah
Secretary
4,0
Sari Natalia
Computer Operator 1
5,5
Khairiandi
Computer Operator 1
1,0
Syarifuddin
Computer Operator 2
5,5
To Be Name
Computer Operator 2
-
Nasrullah
Office Boy
5,5
Syamsudin
Office Boy
3,0
Hendra
Security
9,5
Propinsi Sumatera Barat (Padang)
379.325.000
Rossa
Ass Office Manager
13,5
Leonardy Maha P
Ass Office Manager
13,0
Leonardy Maha P
Ass Office Manager
7,0
Zufniati, S.Kom
Secretary
9,5
Dayla May C, S.Kom
Secretary
17,0
Dayla May C, S.Kom
Secretary
7,0
Ibrahim Al Hadid
Computer Operator 1
2,5
Dayla May C, S.Kom
Computer Operator 1
7,0
Leonardy Maha P
Computer Operator 1
4,0
Rossa
Computer Operator 1
2,0
Vani Monita
Computer Operator 1
18,0
Daslim
Computer Operator 2
2,5
Leonardy Maha P
Computer Operator 2
7,0
Maulana Lukman
Computer Operator 2
1,0
Vani Monita
Computer Operator 2
5,0
Yeni Wasmal
Computer Operator 2
1,0
Vebrina Putri Risman
Computer Operator 2
17,0
Silus
Office Boy
26,5
Silus
Office Boy
7,0
Oswandi
Security
7,5
M. Fadri Anwar
Security
19,0
M. Fadri Anwar
Security
7,0
Propinsi Riau (Pekanbaru)
380.375.000
Agus Djuniar
Ass Office Manager
26,5
Agus Djuniar
Ass Office Manager
7,0
Yunita Safitri
Secretary
2,5
Marzarina Safri
Secretary
24,0
Marzarina Safri
Secretary
7,0
Marzarina Safri
Computer Operator 1
2,5
Indah Nursyiam
Computer Operator 1
24,0
Indah Nursyiam
Computer Operator 1
7,0
Indah Nursyiam
Computer Operator 2
2,5
Meliswati
Computer Operator 2
24,0
Meliswati
Computer Operator 2
7,0
5
Yuliana Pertiwi
Office Boy
33,5
6
Rahmad
Security
26,5
Rahmad
Security
7,0
2
3
4
Amount
Remuneration // 7 of 67
NO.
NAME
POSITION
AMENDEMENT CONTRACT NO. 7 Vol
I.2.6 1
2
3
4
5
6
Propinsi Kepulauan Riau (Tanjung Pinang) Ass Office Manager
21,5
Hidayati Anugerah
Ass Office Manager
12,0
Hidayati Anugerah
Secretary
21,5
Diza Meyrianda
Secretary
12,0
Diza Meyrianda
Computer Operator 1
21,5
Nadhia Masturina
Computer Operator 1
12,0
Eva Kardina Yuditha
Computer Operator 2
26,5
Eva Kardina Yuditha
Computer Operator 2
Husni Rozikin
Office Boy
Husni Rozikin
Office Boy
Ricky Juhendra
Security
26,5
Ricky Juhendra
Security
7,0
7,0 26,5 7,0
1.2.7 SUPPORT STAFF KORKOT + ASKOT Provinsi Sumatera Utara
1
Korkot 1 (Kota Medan) 1. Titin Handayani
13,5
Secretary
13,0
Afifah Maya Sari
Secretary
13,5
Dwi Anggriani Tarigan
Computer Operator
13,0
Dwi Anggriani Tarigan
Computer Operator
7,0
Office Boy
1,5
Fransta Wijaya
Office Boy
25,0
Fransta Wijaya
Office Boy
7,0
Secretary
26,5
Korkot 2 (Kota Tebing Tinggi)
Dewi Septiana Lestari 2. Muhammad Rizky Sinaga Muhammad Rizky Sinaga 3. Erna Ningsih Erna Ningsih
Secretary Computer Operator Computer Operator
7,0 26,5 7,0
Office Boy
26,5
Office Boy
7,0
Korkot 3 (Kab. Deli Serdang) 1. Atiya Tunnur
Secretary
1,5
Yane Mutia
Secretary
12,0
Cut Mutia Sari
Secretary
4,0
Dewi Purnama Sari
Secretary
16,0
2. Yane Mutia
Computer Operator
1,5
Cut Mutia Sari
Computer Operator
12,0
Vinky Feronika
Computer Operator
13,0
Vinky Feronika
Computer Operator
7,0
3. Poniem Poniem
4
7,0
Computer Operator
1. Dewi Septiana Lestari
3
1.835.600.000
Secretary
3. Desi Purnamasari
2
4.575.313.000
Afifah Maya Sari
2. Maya Putri Kirana
Amount 378.275.000
Claudia Kristianti
A.
Rate
Office Boy
26,5
Office Boy
7,0
Secretary
26,5
Korkot 4 (Kota Binjai) 1. Rita Damayanti
Remuneration // 8 of 67
NO.
NAME
POSITION
AMENDEMENT CONTRACT NO. 7 Vol
Rita Damayanti 2. Susi Setianingsih Susi Setianingsih 3. Mayang Sarifani
5
7,0 13,5 13,0
Shahnaz Hafiza R
Office Boy
7,0
Amount
Secretary
26,5
Secretary
7,0
Korkot 5 (Kota Padang Sidempuan)
Computer Operator
8,5
Sabra
Computer Operator
18,0
Sabra
Computer Operator
3. Sahroni Sahroni
7,0
Office Boy
26,5
Office Boy
7,0
Secretary
26,5
Secretary
7,0
Korkot 6 (Kota Pematang Siantar) 1. Siti Latifah Siti Latifah 2. Sahril Batubara Sahril Batubara 3. Rikijin Sijabat Rikijin Sijabat
Computer Operator
26,5
Computer Operator
7,0
Office Boy
26,5
Office Boy
7,0
Secretary
26,5
Korkot 7 (Kota Tanjung Balai) 1. Juliani Wirdasari Juliani Wirdasari 2. Dewi Tika Dewi Tika
Secretary
7,0
Computer Operator
26,5
Computer Operator
7,0
3. Ricky Yakub Sambas
Office Boy
7,5
Dedi Rosmanto
Office Boy
19,0
Dedi Rosmanto
Office Boy
7,0
Secretary
26,5
Secretary
7,0
Korkot 8 (Kab. Karo) 1. Sulastry Br Ginting Sulastry Br Ginting 2. Supriantho Viator Tarigan
Computer Operator
8,5
Rina Oktaviani br Purba
Computer Operator
10,0
Adelina
Computer Operator
15,0
Office Boy
26,5
Office Boy
7,0
3. Ani Ani
9
26,5
Computer Operator
Office Boy
2. Yusnidar
8
Computer Operator
Office Boy
Satila
7
Rate
7,0
Shahnaz Hafiza R
1. Satila
6
Secretary
Askot 1 (Kab. Simalungun) 1. Adibah Chaerani Pane
Computer Operator
13,5
Sri Andani
Computer Operator
5,0
Era Nurhaini
Computer Operator
15,0
Office Boy
13,5
2. Sri Andani Laura Marpaung
Office Boy
5,0
Sri Wahyuni
Office Boy
15,0 Remuneration // 9 of 67
NO.
NAME
POSITION
AMENDEMENT CONTRACT NO. 7 Vol
10
Halimatun Sa'diyah 2. Heriani Br Sinaga Heriani Br Sinaga
Suryani 2. Sihol Sihol
Tina Asmiani Harahap 2. Ikram Fauzi Ikram Fauzi
Wisti Mawarni 2. Iwan Boy Sinamo Iwan Boy Sinamo
Office Boy
7,0
Computer Operator
26,5
Computer Operator
7,0
Office Boy
26,5
Office Boy
7,0
Computer Operator Computer Operator
26,5 7,0
Office Boy
26,5
Office Boy
7,0
Computer Operator
26,5
Computer Operator
7,0
Office Boy
26,5
Office Boy
7,0
Computer Operator
13,5
Putri Afriyani NS
Computer Operator
13,0
Putri Afriyani NS
Computer Operator
7,0
2. Siti Mariam
Office Boy
1,5
Putri Afriyani NS
Office Boy
12,0
Yusri Anggraini Sitorus
Office Boy
13,0
Yusri Anggraini Sitorus
Office Boy
7,0
B.
Propinsi NAD
1
Korkot 1 (Kota Banda Aceh) 1. Ade Vidra Puspita Sari
390.175.000
Secretary
7,5
Secretary
2,0
Computer Operator
7,5
Computer Operator
1,0
Office Boy
9,5
1. Ria Rosika
Secretary
9,5
2. Arif Dwi Cahyo
Computer Operator
9,5
3. Sugeng
Office Boy
9,5
Secretary
9,5
Cut Miswari 2. Cut Miswari Nieky Sabatini 3. Yusri Yunus
3
26,5
Askot 6 (Kab. Asahan) 1. Meirani Situmorang
2
7,0
Office Boy
Askot 5 (Kab. Dairi) 1. Wisti Mawarni
14
Computer Operator
26,5
Askot 4 (Kab. Labuhan Batu) 1. Tina Asmiani Harahap
13
Computer Operator
Askot 3 (Kota Sibolga) 1. Suryani
12
Amount
Askot 2 (Kab. Langkat) 1. Halimatun Sa'diyah
11
Rate
Korkot 2 (Kota Langsa)
Korkot 3 (Kab. Pidie) 1. Isna Dewi
Remuneration // 10 of 67
NO.
NAME
POSITION
AMENDEMENT CONTRACT NO. 7 Vol
4
Computer Operator
9,5
3. Abubakar
Office Boy
9,5
1. Nevitra Isniarti
Secretary
9,5
2. Maqfiroh Wahidah
Computer Operator
3,5
Meirizal Amin
Computer Operator
1,0
Nuaraini Bancin
Computer Operator
5,0
Office Boy
9,5
1. Nurbaiti
Secretary
8,0
2. Rosiana
Korkot 5 (Kab. Aceh Tenggara)
Computer Operator
1,0
Annida Wijaya Yusuf
Computer Operator
5,0
Azhari Basar
Computer Operator
2,0
Office Boy
7,0
1. Weny Putri Izzati
Secretary
8,5
Tia Surfah
Secretary
1,0
Computer Operator
8,5
Computer Operator
1,0
Office Boy
8,5
1. Susan Triska
Secretary
8,5
Gustania Fajri
Secretary
1,0
Computer Operator
8,5
Computer Operator
1,0
Office Boy
9,5
3. Deni Darmawan
6
Korkot 6 (Kota Lhokseumawe)
2. Tia Sufrah Andriansyah 3. Andriansyah
7
Korkot 7 (Kab. Aceh Barat)
2. T. Habil Laksamana Yuni Marliana 3. Indra
8
9
10
11
12
Amount
Korkot 4 (Kota Subulussalam)
3. Susi Solin
5
Rate
2. Khairuddin
Korkot 8 (Kab. Gayo Lues) 1.
Secretary
-
2.
Computer Operator
-
3.
Office Boy
-
Askot 1 (Kota Sabang) 1. Desi Fadila
Computer Operator
2.
Office Boy
9,5 -
Askot 2 (Kab. Aceh Tengah) 1. Romy Syafrizal
Computer Operator
9,5
2. Erwin Syahputra
Office Boy
5,0
1. Maulidar
Computer Operator
9,5
2.
Office Boy
Askot 3 (Kab. Aceh Besar)
-
Askot 4 (Kab. Aceh Tamiang) Remuneration // 11 of 67
NO.
NAME
POSITION
AMENDEMENT CONTRACT NO. 7 Vol
Computer Operator
3,5
Zikriatul Ulya
Computer Operator
3,0
Ida Yunita
Computer Operator
3,0
2.
13
Office Boy
1. Asbar Medi
Computer Operator
2.
Office Boy
Propinsi Sumatera Barat
1
Korkot 1 (Kota Padang)
9,5 -
1.324.563.000
Secretary
18,5
Yesi Maiyulini
Secretary
15,0
Computer Operator
26,5
Computer Operator
7,0
Rinaldi 3. Fitriyanti
Office Boy
26,5
Office Boy
7,0
1. Sri Wahyuni, SE
Secretary
17,5
Yosi Maharani
Secretary
4,0
Merry Septia Adhelina
Secretary
12,0
2. Maidina Yunella Putri
Computer Operator
11,5
Deo Hendryan
Computer Operator
5,0
Merry Septia Adhelina
Computer Operator
5,0
Ria Anggrainy
Computer Operator
12,0
Office Boy
26,5
Office Boy
7,0
Secretary
9,5
Septia Fitri Jayanto
Secretary
17,0
Septia Fitri Jayanto
Secretary
7,0
Fitriyanti
Korkot 2 (Kota Sawahlunto)
3. Mimi Asyuarti Mimi Asyuarti
Korkot 3 (Kota Payakumbuh) 1. Yanuar Reviani
2. Dedi Firma
Computer Operator
0,5
Erizal Sandi
Computer Operator
26,0
Erizal Sandi
Computer Operator
7,0
3. Lusiamitra Lusiamitra
4
-
1. Ryan Trika Sari
2. Rinaldi
3
Amount
Askot 5 (Kab. Aceh Selatan)
C.
2
Rate
1. Wahyu Murtika
Office Boy
26,5
Office Boy
7,0
Korkot 4 (Kota Bukittinggi) 1. Dewi Wahyuni, S.Pd
Secretary
2,5
Arifah Rahmi
Secretary
19,0
Vely Karlina
Secretary
12,0
2. Maulana Lukman
Computer Operator
9,5
Yopi Ofiza
Computer Operator
17,0
Yopi Ofiza
Computer Operator
7,0
Office Boy
2,5
3. Arifah Rahmi Rahma Liza
Office Boy
9,0
Dira Sudirman
Office Boy
15,0 Remuneration // 12 of 67
NO.
NAME
POSITION
AMENDEMENT CONTRACT NO. 7 Vol
Dira Sudirman
5
7,0
1. Adharani Musdalifah
Secretary
14,8
Nofriyanti Rizky
Secretary
18,7
Computer Operator
17,5
Computer Operator
16,0
Office Boy
26,5
Office Boy
7,0
1. Vilka Elfia Nasrul, SE
Computer Operator
3,5
Yofanda Tessa
Computer Operator
13,0
Githa Prima Zoni
Computer Operator
17,0
Office Boy
23,0
Office Boy
7,0
Computer Operator
6,5
Indrianti
Computer Operator
20,0
Indrianti
Computer Operator
Fitri Handayani 3. Yuini Yuini
Askot 1 (Kota Solok)
2. Syahril Syahril 7
Askot 2 (Kab. Sijunjung) 1. Supriadi
2. Budi Pamel
26,5
Office Boy
7,0
1. Nurhaida
Computer Operator
4,5
Fitriani
Computer Operator
9,0
Welya Fitri
Computer Operator
4,0
Intan Yulia Rekha
Computer Operator
16,0
Askot 3 (Kab. Lima Puluh Kota)
2. Jasminar
9
Rasyid Rizki Saputra 2. Muhammad Zikri Muhammad Zikri
-
Computer Operator Computer Operator
26,5 7,0
Office Boy
25,5
Office Boy
7,0
Askot 5 (Kota Padang Panjang) 1. Sasmita Sari Sasmita Sari 2. Aryani
11
Office Boy
Askot 4 (Kab. Agam) 1. Rasyid Rizki Saputra
10
7,0
Office Boy
Budi Pamel 8
Amount
Korkot 5 (Kota Pariaman)
2. Trisno Fahrorozi, A.M.d
6
Rate
Office Boy
Computer Operator
26,5
Computer Operator
7,0
Office Boy
13,5
Robbi SF
Office Boy
13,0
Robbi SF
Office Boy
7,0
Askot 6 (Kab. Padang Pariaman) 1. Nola Elpedriana Nola Elpedriana 2. Indra AP Indra AP
Computer Operator
26,5
Computer Operator
7,0
Office Boy
26,5
Office Boy
7,0
Remuneration // 13 of 67
NO.
NAME
POSITION
AMENDEMENT CONTRACT NO. 7 Vol
12
1.
Computer Operator
-
2.
Office Boy
-
D.
Propinsi Riau
1
Korkot 1 (Kota Pekanbaru) 1. Samiasih Lestari Samiasih Lestari 2. Hasrida
Secretary
7,0 4,5 9,0
Nurhayati Khasanah
Computer Operator
6,0
Inah Meitasari
Computer Operator
14,0
Office Boy
26,5
Office Boy
7,0
Secretary
26,5
Secretary
7,0
Computer Operator
9,5
Rosmidah
Computer Operator
17,0
Rosmidah
Computer Operator
7,0
Korkot 2 (Kota Dumai)
Putri Febriyani 2. Hariadi. H
3. Surbayani
Office Boy
18,5
Office Boy
15,0
Computer Operator
10,5
Nopa Betri
Computer Operator
16,0
Nopa Betri
Computer Operator
7,0
Office Boy
7,0
Juman
Askot 1 (Kab. Kuantan Singingi) 1. Ety Susanti
2. To Be Name
Askot 2 (Kab. Bengkalis) 1. Yayan Diana
Computer Operator
10,5
Eva Revania
Computer Operator
16,0
Eva Revania
Computer Operator
7,0
Office Boy
7,0
2. To Be Name
5
26,5
Computer Operator
1. Putri Febriyani
4
Secretary
Computer Operator
Alan Kaslan
3
Amount
516.325.000
Murtysol
3. Alan Kaslan
2
Rate
Askot 7 (Kab. Pesisir Selatan)
Askot 3 (Kab. Indragiri Hilir) 1. Ani Jatmiatin Ani Jatmiatin 2. To Be Name
E.
Propinsi Kepulauan Riau
1
Korkot 1 (Kota Batam) 1. Indah Sri Rezeky
Computer Operator
26,5
Computer Operator
7,0
Office Boy
7,0
508.650.000
Secretary
5,5
Miwirza Nindya Ananta
Secretary
9,0
Endi Selvi
Secretary
19,0
2. Dian Indah Silvia
Computer Operator
4,5
Ratih Indriani
Computer Operator
7,0
Andi Selvi
Computer Operator
3,0 Remuneration // 14 of 67
NO.
NAME
POSITION
AMENDEMENT CONTRACT NO. 7 Vol
Rizki Kurnia Bahri
Computer Operator
3. Totok Santoso
2
Office Boy
7,5
Eny Anggraeni
Office Boy
19,0
Eny Anggraeni
Office Boy
7,0
Secretary
26,5
Secretary
7,0
Shinta Fitriyani 2. Sabena Sabena 3. Rafli Rafli
Computer Operator
26,5
Computer Operator
7,0
Office Boy
26,5
Office Boy
7,0
Askot 1 (Kota Tanjung Pinang) 1. Lalu Irwan Lalu Irwan 2. Bulkaini Bulkaini
4
Amount
Korkot 2 (Kab. Karimun) 1. Shinta Fitriyani
3
Rate
19,0
Computer Operator Computer Operator
26,5 7,0
Office Boy
26,5
Office Boy
7,0
Askot 2 (Kab. Bintan) 1. Hengki Priadi Hengki Priadi 2. Winarto Winarto
Computer Operator
26,5
Computer Operator
7,0
Office Boy
26,5
Office Boy
7,0
TOTAL REMUNERATION
39.659.708.000
Remuneration // 15 of 67
II DIRECT REEIMBURSABLE COST 2.1. MOBILIZATION / DEMOBILIZATION NO
DESCRIPTION
AMENDEMENT CONTRACT NO. 7
UNIT Vol
2.1
Rate
Amount
Mobilization / Demobilization
1
Original Place - Medan
Trip
11
1.800.000
19.800.000
2
Original Place - Banda Aceh
Trip
10
2.500.000
25.000.000
3
Original Place - Padang
Trip
10
1.800.000
18.000.000
4
Original Place - Pekanbaru
Trip
10
1.800.000
18.000.000
5
Original Place - Tj. Pinang/Batam
Trip
10
1.900.000
19.000.000
TOTAL
99.800.000
II.1 // 16 of 67
II DIRECT REEIMBURSABLE COST 2.2. HOUSING ALLOWANCE NO.
AMENDEMENT CONTRACT NO. 7
DESCRIPTION Vol
2.2
Rate
Amount
Housing Allowance OC Level
1
Program Director
33,5
500.000
16.750.000
Province Level (North Sumatera) 1
Provincial Team Leader
33,5
500.000
16.750.000
2
Monev Specialist
33,5
500.000
16.750.000
3
MIS Specialist
7,0
500.000
3.500.000
4
Socialization Specialist
33,5
500.000
16.750.000
5
Training Specialist
33,5
500.000
16.750.000
6
Infrastructure Specialist
7,0
500.000
3.500.000
7
Micro Fin & Fin.Mgmt Spec.
7,0
500.000
3.500.000
8
Local Gov & Public Policy Spec
18,0
500.000
9.000.000
9
Livelihood & SME's Specialist
31,5
500.000
15.750.000
10
Urban Planner Specialist**)
28,5
500.000
14.250.000
Province Level (NAD) 1
Provincial Team Leader
5,5
500.000
2.750.000
2
Monev Specialist
9,5
500.000
4.750.000
3
MIS Specialist
9,0
500.000
4.500.000
4
Socialization Specialist
9,5
500.000
4.750.000
5
Training Specialist
9,5
500.000
4.750.000
6
Infrastructure Specialist
9,5
500.000
4.750.000
7
Micro Fin & Fin.Mgmt Spec.
9,5
500.000
4.750.000
8
Local Gov & Public Policy Spec
8,5
500.000
4.250.000
9
Livelihood & SME's Specialist
9,5
500.000
4.750.000
10
Urban Planner Specialist**)
9,5
500.000
4.750.000
Province Level (West Sumatera) 1
Provincial Team Leader
23,0
500.000
11.500.000
2
Monev Specialist
33,5
500.000
16.750.000
3
MIS Specialist
25,0
500.000
12.500.000
4
Socialization Specialist
7,0
500.000
3.500.000
5
Training Specialist
18,0
500.000
9.000.000
6
Infrastructure Specialist
7,0
500.000
3.500.000
7
Micro Fin & Fin.Mgmt Spec.
33,5
500.000
16.750.000
8
Local Gov & Public Policy Spec
18,0
500.000
9.000.000
9
Livelihood & SME's Specialist
33,5
500.000
16.750.000 II.2 // 17 of 67
NO.
AMENDEMENT CONTRACT NO. 7
DESCRIPTION Vol
10
Urban Planner Specialist**)
Rate
Amount
7,0
500.000
3.500.000
Province Level (Riau) 1
Provincial Team Leader
33,5
500.000
16.750.000
2
Monev Specialist
33,5
500.000
16.750.000
3
MIS Specialist
33,5
500.000
16.750.000
4
Socialization Specialist
33,5
500.000
16.750.000
5
Training Specialist
33,5
500.000
16.750.000
6
Infrastructure Specialist
33,5
500.000
16.750.000
7
Micro Fin & Fin.Mgmt Spec.
33,5
500.000
16.750.000
8
Local Gov & Public Policy Spec
33,5
500.000
16.750.000
9
Livelihood & SME's Specialist
33,5
500.000
16.750.000
10
Urban Planner Specialist**)
-
500.000
-
Province Level (Kep. Riau) 1
Provincial Team Leader
33,5
500.000
16.750.000
2
Monev Specialist
33,5
500.000
16.750.000
3
MIS Specialist
32,5
500.000
16.250.000
4
Socialization Specialist
33,5
500.000
16.750.000
5
Training Specialist
33,5
500.000
16.750.000
6
Infrastructure Specialist
26,5
500.000
13.250.000
7
Micro Fin & Fin.Mgmt Spec.
23,5
500.000
11.750.000
8
Local Gov & Public Policy Spec
32,5
500.000
16.250.000
9
Livelihood & SME's Specialist
28,5
500.000
14.250.000
10
Urban Planner Specialist**)
-
500.000
-
TOTAL
570.250.000
II.2 // 18 of 67
II DIRECT REEIMBURSABLE COST 2.3. DUTY TRAVEL EXPENSES PROVINCE NAD NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Amount
2.1.1. IN PROVINCE 2.1.1.1 FOR SPOTCHECK PROVINCE TO KELURAHAN (3 % x Number of Kelurahan) a
b
c
d
e
f
g
h
4.500.000
From Banda Aceh to Sabang (18 kel x 3% = 2 kel) Sea Transport
trip
1
300.000
300.000
Tranport
trip
1
100.000
100.000
Acomodation
m/d
-
300.000
-
Lumpsum
m/d
1
50.000
50.000
Tranport
trip
1
100.000
100.000
Acomodation
m/d
-
300.000
-
Lumpsum
m/d
1
50.000
50.000
Tranport
trip
1
300.000
300.000
Acomodation
m/d
1
300.000
300.000
Lumpsum
m/d
2
50.000
100.000
Tranport
trip
1
200.000
200.000
Acomodation
m/d
1
300.000
300.000
Lumpsum
m/d
2
50.000
100.000
From Banda Aceh to Aceh Besar (12 kel x 3% = 2 kel)
From Banda Aceh to Aceh Barat (20 kel x 3% = 3 kel)
From Banda Aceh to Pidie & Lhokseumawe (83 kel x 3% = 10 kel)
From Banda Aceh to Aceh Tengah, Aceh Tenggara & Gayo Lues (74 kel x 3% = 9 kel) Tranport
trip
1
600.000
600.000
Acomodation
m/d
1
300.000
300.000
Lumpsum
m/d
2
50.000
100.000
From Banda Aceh to Aceh Selatan & Subulussalam (88 kel x 3% = 9 kel) Tranport
trip
1
400.000
400.000
Acomodation
m/d
1
300.000
300.000
Lumpsum
m/d
2
50.000
100.000
Tranport
trip
1
300.000
300.000
Acomodation
m/d
1
300.000
300.000
Lumpsum
m/d
2
50.000
100.000
m/d
2
50.000
100.000
From Banda Aceh to Langsa & Aceh Tamiang (56 kel x 3% = 7 kel)
From Banda Aceh to Banda Aceh (89 kel x 3% = 10 kel) Lumpsum
2.1.1.2 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM
5.300.000
A. For City Coordinator and Assistance City Coordinator (440 Kel x 50%) x 4
trip
24
50.000
1.200.000 II.3 // 19 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Amount
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
B. For Ass. City Coordinator Infrastructure and FM in the city ((440 Kel - 65 Kel luar kota) x 50%) x 14
trip
18
50.000
900.000
Sea Transport
trip
2
300.000
600.000
Transport
trip
2
100.000
200.000
trip
2
200.000
400.000
trip
2
300.000
600.000
trip
2
300.000
600.000
trip
4
200.000
800.000
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
C. For City Coordinator Infrastructure and FM out of te town 1
2
From Banda Aceh to Sabang
From Banda Aceh to Aceh Besar From Pidie to Aceh Besar Transport
3
From Subulussalam to Aceh Selatan From Aceh Barat to Aceh Selatan Transport
4
From Aceh Tenggara to Aceh Tengah Transport
5
From Langsa to Aceh Tamiang Transport
2.1.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL a
b
-
From Banda Aceh to Sabang Sea Transport
trip
-
300.000
-
Tranport
trip
-
100.000
-
Lumpsum
trip
-
50.000
-
Tranport
trip
-
200.000
-
Lumpsum
trip
-
50.000
-
Tranport
trip
-
300.000
-
Lumpsum
trip
-
50.000
-
Tranport
trip
-
300.000
-
Lumpsum
trip
-
50.000
-
From Banda Aceh to Aceh Besar From Pidie to Aceh Besar
c
From Subulussalam to Aceh Selatan From Aceh Barat to Aceh Selatan
d
e
From Aceh Tenggara to Aceh Tengah
From Langsa to Aceh Tamiang II.3 // 20 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Tranport
trip
-
200.000
-
Lumpsum
trip
-
50.000
-
2.1.1.4 FROM KAB/KOTA TO TL OFFICE FOR COORDIANTION MEETING a
b
c
d
e
Amount
55.200.000
From Sabang to Banda Aceh Sea Transport
trip
6
300.000
1.800.000
Tranport
trip
6
100.000
600.000
Acomodation
m/d
6
300.000
1.800.000
OSA
m/d
12
50.000
600.000
Tranport
trip
6
100.000
600.000
Acomodation
m/d
6
300.000
1.800.000
OSA
m/d
12
50.000
600.000
Tranport
trip
6
300.000
1.800.000
Acomodation
m/d
6
300.000
1.800.000
OSA
m/d
12
50.000
600.000
Tranport
trip
12
200.000
2.400.000
Acomodation
m/d
12
300.000
3.600.000
OSA
m/d
24
50.000
1.200.000
Tranport
trip
18
600.000
10.800.000
Acomodation
m/d
18
300.000
5.400.000
OSA
m/d
36
50.000
1.800.000
Tranport
trip
12
400.000
4.800.000
Acomodation
m/d
12
300.000
3.600.000
OSA
m/d
24
50.000
1.200.000
Tranport
trip
12
300.000
3.600.000
Acomodation
m/d
12
300.000
3.600.000
OSA
m/d
24
50.000
1.200.000
From Aceh Besar to Banda Aceh
From Aceh Barat to Banda Aceh
From Pidie & Lhokseumawe to Banda Aceh
From Aceh Tengah, Aceh Tenggara & Gayo Lues to Banda Aceh From Aceh Tengah, Aceh Tenggara to Banda Aceh
f
g
From Aceh Selatan & Subulussalam to Banda Aceh
From Langsa & Aceh Tamiang to Banda Aceh
II.3 // 21 of 67
NO
DESCRIPTION
AMENDEMENT CONTRACT NO. 7
UNIT
Vol
Rate
2.1.1.5 FROM PROVINCE TO REGIONAL FOR WORKSHOP & COORDINATION MEETING AT OC
Amount
6.300.000
Workshop OC / Coordination Meeting at OC From Banda Aceh to Medan Air Transport
Trip
3
1.500.000
4.500.000
OSA [ Fixed ]
Man/ Days Trip
6
100.000
600.000
3
100.000
300.000
Man/ Days
3
300.000
900.000
Local Transport Accomodation
2.1.1.6 FOR SEVERAL TRAINING & SPECIAL EVENT FROM KAB. TO BANDA ACEH
62.500.000
For Training Inland Transport for Korkot&Askot (13 Kota/Kab) on OC Consolidation a
b
From Sabang to Banda Aceh Sea Transport
trip
5
300.000
1.500.000
Inlandtranport
trip
5
100.000
500.000
trip
2
100.000
200.000
trip
14
300.000
4.200.000
trip
22
200.000
4.400.000
trip
30
600.000
18.000.000
trip
12
400.000
4.800.000
trip
12
300.000
3.600.000
Sea Transport
trip
5
300.000
1.500.000
Inlandtranport
trip
5
100.000
500.000
trip
3
100.000
300.000
trip
5
300.000
1.500.000
From Aceh Besar to Banda Aceh Tranport
c
From Aceh Barat to Banda Aceh Tranport
d
From Pidie & Lhokseumawe to Banda Aceh Tranport
e
From Aceh Tengah, Aceh Tenggara & Gayo Lues to Banda Aceh From Aceh Tengah, Aceh Tenggara to Banda Aceh Tranport
f
From Aceh Selatan & Subulussalam to Banda Aceh Tranport
g
From Langsa & Aceh Tamiang to Banda Aceh Tranport
Inland Transport for SF, FT, FE, FS (13 Kota/Kab) a
b
From Sabang to Banda Aceh
From Aceh Besar to Banda Aceh Tranport
c
From Aceh Barat to Banda Aceh Tranport
II.3 // 22 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
d
Amount
From Pidie & Lhokseumawe to Banda Aceh Tranport
e
Rate
trip
10
200.000
2.000.000
trip
15
600.000
9.000.000
trip
15
400.000
6.000.000
trip
15
300.000
4.500.000
Sea Transport
trip
-
300.000
-
Tranport
trip
-
100.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
Tranport
trip
-
100.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
Tranport
trip
-
300.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
Tranport
trip
-
200.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
Tranport
trip
-
600.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
Tranport
trip
-
400.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
From Aceh Tengah, Aceh Tenggara & Gayo Lues to Banda Aceh From Aceh Tengah, Aceh Tenggara to Banda Aceh Tranport
f
From Aceh Selatan & Subulussalam to Banda Aceh Tranport
g
From Langsa & Aceh Tamiang to Banda Aceh Tranport
Special Event (by request) 1
2
3
4
5
From Sabang to Banda Aceh
From Aceh Besar to Banda Aceh
From Aceh Barat to Banda Aceh
From Pidie & Lhokseumawe to Banda Aceh
From Aceh Tengah, Aceh Tenggara & Gayo Lues to Banda Aceh From Aceh Tengah, Aceh Tenggara to Banda Aceh
6
From Aceh Selatan & Subulussalam to Banda Aceh
II.3 // 23 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
7
2.1.2
Rate
Amount
From Langsa & Aceh Tamiang to Banda Aceh Tranport
trip
-
300.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
TO JAKARTA
2.1.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST
11.272.000
Air Transport
trip
6
2.500.000
5.672.000
In land Travel in Jakarta
trip
6
200.000
1.200.000
OSA
trip
44
100.000
4.400.000
Hotel Accommodation
trip
-
350.000
-
2.1.2.2 FOR EGM TO JAKARTA
30.598.950
Air Transport 1
EGM TA/SubTA Training
trip
2
2.500.000
1.523.000
2
EGM TA Sosialisasi
trip
2
2.500.000
2.047.950
3
EGM TA/SubTA MK/Sub TA RLF
trip
2
2.500.000
1.523.000
4
EGM TA/SubTA INFRA/Sub TA Safeguard
trip
2
2.500.000
3.307.000
5
EGM TA/SubTA Monev /Sub TA Legal HCU
trip
4
2.500.000
4.497.000
6
EGM TA/SubTA SIM
trip
2
2.500.000
1.834.000
7
EGM TA Local Goverment
trip
2
2.500.000
2.480.000
8
EGM TA Livelihood & SME's
trip
2
2.500.000
1.603.000
9
EGM TA Urban Planner
trip
2
2.500.000
1.784.000
In land Transport in Jakarta
trip
20
200.000
2.000.000
OSA
m/d
80
100.000
8.000.000
Hotel Accommodation
trip
-
350.000
-
4.150.000
2.1.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) Air Transport
trip
1
2.500.000
2.500.000
In land Transport in Jakarta
trip
1
200.000
200.000
Hotel Accommodation
m/d
3
350.000
1.050.000
OSA
m/d
4
100.000
400.000
2.1.2.4 FROM PROVINCE (KMW NAD) TO OTHER PROVINCE (by request)
11.500.000
Air Transport
trip
2
4.000.000
8.000.000
In land Transport in Jakarta
trip
2
300.000
600.000
Hotel Accommodation
m/d
6
350.000
2.100.000
OSA
m/d
8
100.000
800.000
TOTAL DUTY TRAVEL PROVINCE NAD
191.320.950
II.3 // 24 of 67
II DIRECT REEIMBURSABLE COST 2.4. DUTY TRAVEL EXPENSES PROVINCE SUMATERA UTARA NO.
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Amount
2.2.1. IN PROVINCE 2.2.1.1 FOR SPOTCHECK PROVINCE TO KELURAHAN (3 % x No. of Kelurahan) a
b
c
d
e
f
g
47.700.000
From Medan to Binjai & Langkat (62 kel x 3% = 5 kel) Tranport
trip
12
200.000
2.400.000
Several transport to Langkat (Remote Village)
trip
6
200.000
1.200.000
Lumpsum
m/d
36
50.000
1.800.000
From Medan to Deli Serdang & Tebing Tinggi (136 kel x 3% = 12 kel) Tranport
trip
18
200.000
3.600.000
Lumpsum
m/d
72
50.000
3.600.000
From Medan to Asahan, Tanjung Balai & Lab. Batu (75 kel x 3% = 7 kel) Tranport
trip
12
200.000
2.400.000
Acomodation
m/d
24
300.000
7.200.000
Lumpsum
m/d
36
50.000
1.800.000
Tranport
trip
6
200.000
1.200.000
Acomodation
m/d
6
300.000
1.800.000
Lumpsum
m/d
12
50.000
600.000
From Medan to Tanah Karo & Dairi (33 kel x 3% = 3 kel)
From Medan to Simalungun & Pematang Siantar (60 kel x 3% = 6 kel) Tranport
trip
6
200.000
1.200.000
Several transport to Simalungun (Remote Village)
trip
6
200.000
1.200.000
Acomodation
m/d
12
300.000
3.600.000
Lumpsum
m/d
18
50.000
900.000
Tranport
trip
12
200.000
2.400.000
Acomodation
m/d
24
300.000
7.200.000
Lumpsum
m/d
36
50.000
1.800.000
m/d
36
50.000
1.800.000
From Medan to Sibolga & Padang Sidempuan (96 kel x 3% = 9 kel)
From Medan to Medan (149 kel x 3% = 12 kel) Lumpsum
2.2.1.2 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM
124.700.000
A. For City Coordinator and Assistance City Coordinator (611 Kel x 50%) x 4
trip
611
50.000
30.550.000
trip
497
50.000
24.850.000
trip
88
100.000
8.800.000
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
B. For Ass. City Coordinator Infrastructure and FM in the city (611 Kel - 114 Kel luar kota) x 50%) x 14 Cost / Day Rp. 50.000.- 1 Day cover 2 kel
C. For City Coordinator Infrastructure and FM out of te town 1
From Binjai to Langkat Transport
II.4 // 25 of 67
NO.
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Lumpsum
2
Rate
Amount
trip
88
50.000
4.400.000
Transport
trip
132
100.000
13.200.000
Lumpsum
trip
132
50.000
6.600.000
Transport
trip
66
100.000
6.600.000
Lumpsum
trip
66
50.000
3.300.000
Transport
trip
44
100.000
4.400.000
Lumpsum
trip
44
50.000
2.200.000
Transport
trip
66
100.000
6.600.000
Lumpsum
trip
66
50.000
3.300.000
Transport
trip
66
100.000
6.600.000
Lumpsum
trip
66
50.000
3.300.000
From Tanjung Balai to Asahan From Deli Serdang, Tebing Tinggi to Asahan
3
4
5
6
From Tanjung Balai to Lab. Batu
From Tanah Karo to Dairi
From Pemantang Siantar to Simalungun
From Padang Sidempuan to Sibolga
2.2.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL <<<< seusaikan status progress CB activity a
b
5.400.000
From Binjai to Langkat Tranport
trip
6
100.000
600.000
Lumpsum
m/d
6
50.000
300.000
Tranport
trip
6
100.000
600.000
Lumpsum
m/d
6
50.000
300.000
Tranport
trip
6
100.000
600.000
Lumpsum
m/d
6
50.000
300.000
Tranport
trip
6
100.000
600.000
Lumpsum
m/d
6
50.000
300.000
Tranport
trip
6
100.000
600.000
Lumpsum
m/d
6
50.000
300.000
Tranport
trip
6
100.000
600.000
Lumpsum
m/d
6
50.000
300.000
From Tanjung Balai to Asahan From Tebing Tinggi to Asahan
c
d
e
f
From Tanjung Balai to Lab. Batu
From Tanah Karo to Dairi
From Pemantang Siantar to Simalungun
From Padang Sidempuan to Sibolga
II.4 // 26 of 67
NO.
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
2.2.1.4 FROM KAB/KOTA TO TL OFFICE FOR COORDIANTION MEETING a
b
c
d
e
f
Amount
225.900.000
From Binjai & Langkat to Medan Tranport
trip
36
100.000
3.600.000
Acomodation
m/d
72
300.000
21.600.000
OSA
m/d
108
50.000
5.400.000
Tranport
trip
36
150.000
5.400.000
Acomodation
m/d
72
300.000
21.600.000
OSA
m/d
108
50.000
5.400.000
Tranport
trip
54
300.000
16.200.000
Acomodation
m/d
108
300.000
32.400.000
OSA
m/d
162
50.000
8.100.000
Tranport
trip
36
200.000
7.200.000
Acomodation
m/d
72
300.000
21.600.000
OSA
m/d
108
50.000
5.400.000
Tranport
trip
36
200.000
7.200.000
Acomodation
m/d
72
300.000
21.600.000
OSA
m/d
108
50.000
5.400.000
Tranport
trip
36
300.000
10.800.000
Acomodation
m/d
72
300.000
21.600.000
OSA
m/d
108
50.000
5.400.000
From Deli Serdang & Tebing Tinggi to Medan
From Asahan, Tanjung Balai & Lab. Batu to Medan
From Tanah Karo & Dairi to Medan
From Simalungun & Pematang Siantar to Medan
From Sibolga & Padang Sidempuan to Medan
2.2.1.5 FOR SEVERAL TRAINING & SPECIAL EVENT FROM KAB. TO MEDAN
279.450.000
For Training Transport for Korkot &Askot (14 Kota/Kab) on OC Consolidation a
From Binjai & Langkat to Medan Tranport
b
16
100.000
1.600.000
trip
16
150.000
2.400.000
trip
24
300.000
7.200.000
From Deli Serdang & Tebing Tinggi to Medan Tranport
c
trip
From Asahan, Tanjung Balai & Lab. Batu to Medan Tranport
II.4 // 27 of 67
NO.
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
d
trip
16
200.000
3.200.000
trip
16
200.000
3.200.000
trip
16
300.000
4.800.000
trip
35
100.000
3.500.000
trip
74
150.000
11.100.000
trip
41
300.000
12.300.000
trip
16
200.000
3.200.000
trip
35
200.000
7.000.000
trip
54
300.000
16.200.000
Tranport
trip
-
100.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
Tranport
trip
-
150.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
Tranport
trip
-
300.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
Tranport
trip
-
200.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
From Simalungun & Pematang Siantar to Medan Tranport
f
Amount
From Tanah Karo & Dairi to Medan Tranport
e
Rate
From Sibolga & Padang Sidempuan to Medan Tranport
Inland Transport for SF, FK, FE, FS (14 Kota/Kab) a
From Binjai & Langkat to Medan Tranport
b
From Deli Serdang & Tebing Tinggi to Medan Tranport
c
From Asahan, Tanjung Balai & Lab. Batu to Medan Tranport
d
From Tanah Karo & Dairi to Medan Tranport
e
From Simalungun & Pematang Siantar to Medan Tranport
f
From Sibolga & Padang Sidempuan to Medan Tranport
Special Event (by request) 1
2
3
4
5
From Binjai & Langkat to Medan
From Deli Serdang & Tebing Tinggi to Medan
From Asahan, Tanjung Balai & Lab. Batu to Medan
From Tanah Karo & Dairi to Medan
From Simalungun & Pematang Siantar to Medan II.4 // 28 of 67
NO.
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
6
Rate
Amount
Tranport
trip
-
200.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
Tranport
trip
-
300.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
From Sibolga & Padang Sidempuan to Medan
BRIDGING (July 2014 to April 2015) 1. Konsolidasi Pemandu Pelatihan Penguatan Pemda dan Stakeholder a. Tranport From Kab to Medan - Binjai & Langkat
trip
-
100.000
-
- Deli Serdang & Tebing Tinggi
trip
-
150.000
-
- Asahan, Tanjung Balai & Lab. Batu
trip
-
300.000
-
- Tanah Karo & Dairi
trip
-
200.000
-
- Simalungun & Pematang Siantar
trip
-
200.000
-
- Sibolga & Padang Sidempuan
trip
-
300.000
-
- Binjai & Langkat
trip
-
100.000
-
- Deli Serdang & Tebing Tinggi
trip
-
150.000
-
- Asahan, Tanjung Balai & Lab. Batu
trip
-
300.000
-
- Tanah Karo & Dairi
trip
-
200.000
-
- Simalungun & Pematang Siantar
trip
-
200.000
-
- Sibolga & Padang Sidempuan
trip
-
300.000
-
2. Pelatihan Penguatan Pemda dan Stakeholder a. Tranport From Kab to Medan
3. Konsolidasi Pemandu Pelatihan Penguatan Askot dan Fasilitator a. Tranport From Kab to Medan - Binjai & Langkat
trip
-
100.000
-
- Deli Serdang & Tebing Tinggi
trip
-
150.000
-
- Asahan, Tanjung Balai & Lab. Batu
trip
-
300.000
-
- Tanah Karo & Dairi
trip
-
200.000
-
- Simalungun & Pematang Siantar
trip
-
200.000
-
- Sibolga & Padang Sidempuan
trip
-
300.000
-
- Binjai & Langkat
trip
-
100.000
-
- Deli Serdang & Tebing Tinggi
trip
-
150.000
-
- Asahan, Tanjung Balai & Lab. Batu
trip
-
300.000
-
- Tanah Karo & Dairi
trip
-
200.000
-
- Simalungun & Pematang Siantar
trip
-
200.000
-
- Sibolga & Padang Sidempuan
trip
-
300.000
-
trip
-
100.000
-
4. Pelatihan Penguatan Askot dan Fasilitator a. Tranport From Kab to Medan
5. Konsolidasi Pemandu Pelatihan PLPBK a. Tranport From Kab to Medan - Binjai & Langkat
II.4 // 29 of 67
NO.
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Amount
- Deli Serdang & Tebing Tinggi
trip
-
150.000
-
- Asahan, Tanjung Balai & Lab. Batu
trip
-
300.000
-
- Tanah Karo & Dairi
trip
-
200.000
-
- Simalungun & Pematang Siantar
trip
-
200.000
-
- Sibolga & Padang Sidempuan
trip
-
300.000
-
- Binjai & Langkat
trip
2
150.000
300.000
- Deli Serdang & Tebing Tinggi
trip
16
300.000
4.800.000
- Asahan, Tanjung Balai & Lab. Batu
trip
26
200.000
5.200.000
- Tanah Karo & Dairi
trip
13
200.000
2.600.000
- Simalungun & Pematang Siantar
trip
17
200.000
3.400.000
- Sibolga & Padang Sidempuan
trip
15
300.000
4.500.000
- Binjai & Langkat
trip
-
150.000
-
- Deli Serdang & Tebing Tinggi
trip
-
300.000
-
- Asahan, Tanjung Balai & Lab. Batu
trip
-
200.000
-
- Tanah Karo & Dairi
trip
-
200.000
-
- Simalungun & Pematang Siantar
trip
-
200.000
-
- Sibolga & Padang Sidempuan
trip
-
300.000
-
- Binjai & Langkat
trip
2
150.000
300.000
- Deli Serdang & Tebing Tinggi
trip
6
300.000
1.800.000
- Asahan, Tanjung Balai & Lab. Batu
trip
7
200.000
1.400.000
- Tanah Karo & Dairi
trip
6
200.000
1.200.000
- Simalungun & Pematang Siantar
trip
6
200.000
1.200.000
- Sibolga & Padang Sidempuan
trip
6
300.000
1.800.000
250.000
55.250.000
6. Pelatihan Dasar PLBPK a. Tranport From Kab to Medan
7. Pelatihan Penguatan PLPBK a. Tranport From Kab to Medan
8. Pelatihan Tim Teknis PLPBK a. Tranport From Kab to Medan
9. Orientasi and Planning Training for Livelihood/PPMK (New Location FY 2014) a. Tranport From Kab to Medan
trip
221
10. Advance Training for Livelihood/PPMK (Location FY 2012) and (Location 2014) a. Tranport From Kab to Medan
trip
480
250.000
120.000.000
trip
24
250.000
6.000.000
trip
70
250.000
17.500.000
21
250.000
5.250.000
BRIDGING (Mei to Desember 2015) 1. Konsolidasi Pemandu Pelatihan Pemerintah Daerah a. Tranport From Kab to Medan
2. Pelatihan Pemerintah Daerah a. Tranport From Kab to Medan
3. Konsolidasi Pemandu Pelatihan Penguatan Program Lanjutan a. Tranport From Kab to Medan
trip
II.4 // 30 of 67
NO.
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Amount
4. Pelatihan Penguatan Program Lanjutan a. Tranport From Kab to Medan
trip
430
250.000
107.500.000
trip
97
250.000
24.250.000
trip
154
250.000
38.500.000
trip
16
250.000
4.000.000
trip
84
250.000
21.000.000
trip
100
250.000
25.000.000
Air Transport
trip
52
1.800.000
In land Travel in Jakarta
trip
52
200.000
9.400.000
OSA
trip
364
100.000
36.400.000
Hotel Accommodation
trip
312
350.000
107.200.000
5. Pelatihan Penguatan PLPBK a. Tranport From Kab to Medan
6. Pelatihan Penguatan PPMK a. Tranport From Kab to Medan
7. Pelatihan SIM a. Tranport From Kab to Medan
8. Pelatihan Khusus Askot MK dan Faskel Ekonomi a. Tranport From Kab to Medan
9. Pelatihan Aplikasi Pembukuan UPK (Computerize System) a. Tranport From Kab to Medan
2.2.2
TO JAKARTA
2.2.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST
231.235.200
2.2.2.2 FOR EGM TO JAKARTA
78.235.200
287.837.000
Air Transport EGM TA/SubTA Training
trip
13
1.800.000
22.377.100
EGM TA Sosialisasi
trip
7
1.800.000
11.577.100
EGM TA/SubTA MK/Sub TA RLF
trip
7
1.800.000
11.398.200
EGM TA/SubTA INFRA/Sub TA Safeguard
trip
13
1.800.000
21.471.200
EGM TA/SubTA Monev /Sub TA Legal HCU
trip
20
1.800.000
33.077.800
EGM TA/SubTA SIM
trip
7
1.800.000
11.299.200
EGM TA Local Goverment
trip
7
1.800.000
11.616.100
EGM TA Livelihood & SME's
trip
7
1.800.000
11.577.100
EGM TA Urban Planner
trip
7
1.800.000
11.343.200
In land Transport in Jakarta
trip
88
200.000
16.000.000
OSA
m/d
352
100.000
35.200.000
Hotel Accommodation
trip
264
350.000
90.900.000
2.2.2.3 FOR COORDINATION MEETING TO JAKARTA (by request)
59.200.000
Air Transport
trip
16
1.800.000
28.800.000
In land Transport in Jakarta
trip
16
200.000
3.200.000
Hotel Accommodation
m/d
64
350.000
22.400.000
OSA
m/d
48
100.000
4.800.000
trip
5
4.000.000
2.2.2.4 FROM PROVINCE (KMW SUMUT) TO OTHER PROVINCE (by request) Air Transport
28.750.000 20.000.000 II.4 // 31 of 67
NO.
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Amount
In land Transport in Jakarta
trip
5
300.000
1.500.000
Hotel Accommodation
m/d
15
350.000
5.250.000
OSA
m/d
20
100.000
2.000.000
2.2.3. PROGRAME DIRECTOR 2.2.3.1 Duty Travel for Program Director to Other Province a.
60.800.000
From Medan to KMW Air Transport
Trip
19
2.000.000
38.000.000
OSA [ Fixed ]
m/d
57
100.000
5.700.000
Local Transport
Trip
19
200.000
3.800.000
Accomodation
m/d
38
350.000
13.300.000
TOTAL DUTY TRAVEL PROVINCE SUMATERA UTARA
1.350.972.200
II.4 // 32 of 67
II DIRECT REEIMBURSABLE COST 2.5. DUTY TRAVEL EXPENSES PROVINCE SUMATERA BARAT NO
DESCRIPTION
AMENDEMENT CONTRACT NO. 7
UNIT
Vol
Rate
Amount
2.3.1 IN PROVINCE 2.3.1.1 FOR SPOTCHECK PROVINCE TO KELURAHAN (3 % x No. of Kelurahan) a
b
c
d
e
41.400.000
From Padang to Agam, Bukit Tinggi & Padang Panjang (47 kel x 3% = 8 kel) Tranport
trip
12
200.000
2.400.000
Acomodation
m/d
12
300.000
3.600.000
Lumpsum
m/d
24
50.000
1.200.000
From Padang to Padang Pariaman & Pariaman (81 kel x 3% = 12 kel) Tranport
trip
18
150.000
2.700.000
Acomodation
m/d
18
300.000
5.400.000
Lumpsum
m/d
36
50.000
1.800.000
From Padang to Limapuluh Kota & Payakumbuh (80 kel x 3% = 11 kel) Tranport
trip
18
250.000
4.500.000
Acomodation
m/d
18
300.000
5.400.000
Lumpsum
m/d
36
50.000
1.800.000
From Padang to Solok, Sawah Lunto & Sijunjung (59 kel x 3% = 9 kel) Tranport
trip
12
300.000
3.600.000
Several transport to Sijunjung (Remote Village)
trip
6
300.000
1.800.000
Acomodation
m/d
12
300.000
3.600.000
Lumpsum
m/d
24
50.000
1.200.000
m/d
48
50.000
2.400.000
From Padang to Padang (104 kel x 3% = 14 kel) Lumpsum
2.3.1.2 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM
123.550.000
A. For City Coordinator and Assistance City Coordinator (371 Kel x 50%) x 4
trip
557
50.000
27.850.000
trip
924
50.000
46.200.000
Transport
trip
30
100.000
3.000.000
Lumpsum
trip
30
50.000
1.500.000
Transport
trip
90
100.000
9.000.000
Lumpsum
trip
90
50.000
4.500.000
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
B. For Ass. City Coordinator Infrastructure and FM in the city (371 Kel - 62 Kel luar kota) x 50%) x 14 Cost / Day Rp. 50.000.- 1 Day cover 2 kel
C. For City Coordinator Infrastructure and FM out of te town 1
2
From Bukit Tinggi to Agam
From Bukit Tinggi to Padang Panjang
II.5 // 33 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
3
Rate
Amount
From Pariaman to Padang Pariaman From Bukit Tinggi to Padang Pariaman
4
5
6
Transport
trip
60
100.000
6.000.000
Lumpsum
trip
60
50.000
3.000.000
Transport
trip
30
100.000
3.000.000
Lumpsum
trip
30
50.000
1.500.000
Transport
trip
60
100.000
6.000.000
Lumpsum
trip
60
50.000
3.000.000
Transport
trip
60
100.000
6.000.000
Lumpsum
trip
60
50.000
3.000.000
From Payakumbuh to Limapuluh Kota
From Sawah Lunto to Solok
From Sawah Lunto to Sijunjung
2.3.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL a
b
c
9.000.000
From Bukit Tinggi to Agam Tranport
trip
6
100.000
600.000
Lumpsum
m/d
18
50.000
900.000
Tranport
trip
6
100.000
600.000
Lumpsum
m/d
18
50.000
900.000
Tranport
trip
6
100.000
600.000
Lumpsum
m/d
18
50.000
900.000
Tranport
trip
6
100.000
600.000
Lumpsum
m/d
18
50.000
900.000
Tranport
trip
6
100.000
600.000
Lumpsum
m/d
18
50.000
900.000
Tranport
trip
6
100.000
600.000
Lumpsum
m/d
18
50.000
900.000
From Bukit Tinggi to Padang Panjang
From Pariaman to Padang Pariaman From Bukit Tinggi to Padang Pariaman
d
e
f
From Payakumbuh to Limapuluh Kota
From Sawah Lunto to Solok
From Sawah Lunto to Sijunjung
2.3.1.4 FROM KAB/KOTA TO TL OFFICE FOR COORDIANTION MEETING a
254.800.000
From Agam, Bukit Tinggi & Padang Panjang to Padang II.5 // 34 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
b
c
d
Rate
Amount
Tranport
trip
78
200.000
15.600.000
Acomodation
m/d
156
300.000
46.800.000
OSA
m/d
234
50.000
11.700.000
Tranport
trip
52
150.000
7.800.000
Acomodation
m/d
104
300.000
31.200.000
OSA
m/d
156
50.000
7.800.000
Tranport
trip
52
250.000
13.000.000
Acomodation
m/d
104
300.000
31.200.000
OSA
m/d
156
50.000
7.800.000
From Padang Pariaman & Pariaman to Padang
From Lima Puluh Kota & Payakumbuh to Padang
From Solok, Sawah Lunto & Sijunjung to Padang Tranport
trip
78
300.000
23.400.000
Acomodation
m/d
156
300.000
46.800.000
OSA
m/d
234
50.000
11.700.000
2.4.1.5 FROM PROVINCE TO REGIONAL FOR WORKSHOP & COORDINATION MEETING AT OC
37.800.000
Workshop OC / Coordination Meeting at OC From Padang to Medan Air Transport
Trip
18
1.500.000
27.000.000
OSA [ Fixed ]
Man/Days
36
100.000
3.600.000
Trip
18
100.000
1.800.000
Man/Days
18
300.000
5.400.000
Local Transport Accomodation
2.3.1.6 FOR SEVERAL TRA. & SPE. EVENT FROM KAB. TO PADANG
360.000.000
For Training Transport for Korkot &Askot (11 Kota/Kab) on OC Consolidation a
From Agam, Bukit Tinggi & Padang Panjang to Padang Tranport
b
200.000
4.800.000
trip
16
150.000
2.400.000
trip
16
250.000
4.000.000
trip
24
300.000
7.200.000
From Lima Puluh Kota & Payakumbuh to Padang Tranport
d
24
From Padang Pariaman & Pariaman to Padang Tranport
c
trip
From Solok, Sawah Lunto & Sijunjung to Padang Tranport
II.5 // 35 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Amount
Inland Transport for SF, FK, FE, FS (11 Kota/Kab) a
From Agam, Bukit Tinggi & Padang Panjang to Padang Tranport
b
trip
29
200.000
5.800.000
trip
45
150.000
6.750.000
trip
45
250.000
11.250.000
trip
31
300.000
9.300.000
Tranport
trip
-
200.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
Tranport
trip
-
150.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
Tranport
trip
-
250.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
Tranport
trip
-
300.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
From Padang Pariaman & Pariaman to Padang Tranport
c
From Lima Puluh Kota & Payakumbuh to Padang Tranport
d
From Solok, Sawah Lunto & Sijunjung to Padang Tranport
Special Event (by request) From Agam, Bukit Tinggi & Padang Panjang to Padang
From Padang Pariaman & Pariaman to Padang
From Lima Puluh Kota & Payakumbuh to Padang
From Solok, Sawah Lunto & Sijunjung to Padang
BRIDGING (July 2014 to April 2015) 1. Konsolidasi Pemandu Pelatihan Penguatan Pemda dan Stakeholder a. Tranport From Kab to Padang - Agam, Bukit Tinggi & Padang Panjang
trip
-
200.000
-
- Padang Pariaman & Pariaman
trip
-
150.000
-
- Lima Puluh Kota & Payakumbuh
trip
-
250.000
-
- Solok, Sawah Lunto & Sijunjung
trip
-
300.000
-
- Agam, Bukit Tinggi & Padang Panjang
trip
-
200.000
-
- Padang Pariaman & Pariaman
trip
-
150.000
-
2. Pelatihan Penguatan Pemda dan Stakeholder a. Tranport From Kab to Padang
II.5 // 36 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Amount
- Lima Puluh Kota & Payakumbuh
trip
-
250.000
-
- Solok, Sawah Lunto & Sijunjung
trip
-
300.000
-
3. Konsolidasi Pemandu Pelatihan Penguatan Askot dan Fasilitator a. Tranport From Kab to Padang - Agam, Bukit Tinggi & Padang Panjang
trip
-
200.000
-
- Padang Pariaman & Pariaman
trip
-
150.000
-
- Lima Puluh Kota & Payakumbuh
trip
-
250.000
-
- Solok, Sawah Lunto & Sijunjung
trip
-
300.000
-
- Agam, Bukit Tinggi & Padang Panjang
trip
-
200.000
-
- Padang Pariaman & Pariaman
trip
-
150.000
-
- Lima Puluh Kota & Payakumbuh
trip
-
250.000
-
- Solok, Sawah Lunto & Sijunjung
trip
-
300.000
-
- Agam, Bukit Tinggi & Padang Panjang
trip
-
200.000
-
- Padang Pariaman & Pariaman
trip
-
150.000
-
- Lima Puluh Kota & Payakumbuh
trip
-
250.000
-
- Solok, Sawah Lunto & Sijunjung
trip
-
300.000
-
- Agam, Bukit Tinggi & Padang Panjang
trip
10
200.000
2.000.000
- Padang Pariaman & Pariaman
trip
23
150.000
3.450.000
- Lima Puluh Kota & Payakumbuh
trip
23
250.000
5.750.000
- Solok, Sawah Lunto & Sijunjung
trip
8
300.000
2.400.000
- Agam, Bukit Tinggi & Padang Panjang
trip
-
200.000
-
- Padang Pariaman & Pariaman
trip
-
150.000
-
- Lima Puluh Kota & Payakumbuh
trip
-
250.000
-
- Solok, Sawah Lunto & Sijunjung
trip
-
300.000
-
- Agam, Bukit Tinggi & Padang Panjang
trip
7
200.000
1.400.000
- Padang Pariaman & Pariaman
trip
6
150.000
900.000
- Lima Puluh Kota & Payakumbuh
trip
6
250.000
1.500.000
- Solok, Sawah Lunto & Sijunjung
trip
7
300.000
2.100.000
4. Pelatihan Penguatan Askot dan Fasilitator a. Tranport From Kab to Padang
5. Konsolidasi Pemandu Pelatihan PLPBK a. Tranport From Kab to Padang
6. Pelatihan Dasar PLBPK a. Tranport From Kab to Padang
7. Pelatihan Penguatan PLPBK a. Tranport From Kab to Padang
8. Pelatihan Tim Teknis PLPBK a. Tranport From Kab to Padang
9. Orientasi and Planning Training for Livelihood/PPMK (New Location FY 2014) II.5 // 37 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
a. Tranport From Kab to Padang
trip
Rate
287
250.000
Amount 71.750.000
10. Advance Training for Livelihood/PPMK (Location FY 2012) and (Location 2014) a. Tranport From Kab to Padang
trip
291
250.000
72.750.000
trip
18
250.000
4.500.000
trip
55
250.000
13.750.000
trip
15
250.000
3.750.000
trip
271
250.000
67.750.000
trip
61
250.000
15.250.000
trip
55
250.000
13.750.000
trip
93
250.000
23.250.000
trip
10
250.000
2.500.000
trip
51
250.000
12.750.000
trip
61
250.000
15.250.000
BRIDGING (Mei to Desember 2015) 1. Konsolidasi Pemandu Pelatihan Pemerintah Daerah a. Tranport From Kab to Padang
2. Pelatihan Pemerintah Daerah a. Tranport From Kab to Padang
3. Konsolidasi Pemandu Pelatihan Penguatan Program Lanjutan a. Tranport From Kab to Padang
4. Pelatihan Penguatan Program Lanjutan a. Tranport From Kab to Padang
5. Pelatihan Penguatan PLPBK a. Tranport From Kab to Padang
6. Pelatihan Tim Teknis PLPBK (Sumbar) a. Tranport From Kab to Padang
7. Pelatihan Penguatan PPMK a. Tranport From Kab to Padang
8. Pelatihan SIM a. Tranport From Kab to Padang
9. Pelatihan Khusus Askot MK dan Faskel Ekonomi a. Tranport From Kab to Padang
10. Pelatihan Aplikasi Pembukuan UPK (Computerize System) a. Tranport From Kab to Padang
2.3.2 TO JAKARTA 2.3.2.1
FOR SEVERAL TRAINING TO JAKARTA BY REQUEST
242.187.300
Air Transport
trip
In land Travel in Jakarta OSA Hotel Accommodation
86.887.300
53
1.800.000
trip
53
200.000
9.700.000
trip
371
100.000
37.100.000
trip
318
350.000
108.500.000
2.3.2.2 FOR EGM TO JAKARTA
258.198.800
Air Transport EGM TA/SubTA Training
trip
7
1.800.000
10.725.700 II.5 // 38 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Amount
EGM TA Sosialisasi
trip
7
1.800.000
11.765.700
EGM TA/SubTA MK/Sub TA RLF/Sub Syariah
trip
13
1.800.000
21.945.200
EGM TA/SubTA INFRA/Sub TA Safeguard
trip
7
1.800.000
11.145.200
EGM TA/SubTA Monev /Sub TA Legal HCU
trip
13
1.800.000
20.647.200
EGM TA/SubTA SIM
trip
7
1.800.000
11.765.700
EGM TA Local Goverment
trip
7
1.800.000
10.693.200
EGM TA Livelihood & SME's
trip
7
1.800.000
10.571.700
EGM TA Urban Planner
trip
7
1.800.000
10.539.200
In land Transport in Jakarta
trip
75
200.000
13.600.000
OSA
m/d
348
100.000
34.800.000
Hotel Accommodation
trip
261
350.000
90.000.000
Air Transport
trip
13
1.800.000
23.400.000
In land Transport in Jakarta
trip
13
200.000
2.600.000
OSA
m/d
52
100.000
5.200.000
Hotel Accommodation
m/d
39
350.000
13.650.000
2.3.2.3 FOR COORDINATION MEETING TO JAKARTA (by request)
44.850.000
2.3.2.4 FROM PROVINCE (KMW SUMBAR) TO OTHER PROVINCE (by request)
28.750.000
Air Transport
trip
5
4.000.000
20.000.000
In land Transport in Jakarta
trip
5
300.000
1.500.000
Hotel Accommodation
m/d
15
350.000
5.250.000
OSA
m/d
20
100.000
2.000.000
TOTAL DUTY TRAVEL PROVINCE SUMATERA BARAT
1.400.536.100
II.5 // 39 of 67
II DIRECT REEIMBURSABLE COST 2.6. DUTY TRAVEL EXPENSES PROVINCE RIAU NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Amount
2.4.1 IN PROVINCE 2.4.1.1 FOR SPOTCHECK PROVINCE TO KELURAHAN (3 % x No. of Kelurah a
b
c
d
62.700.000
From Pekanbaru to Bengkalis (15 kel x 3% = 6 kel) Sea Transport
trip
12
350.000
4.200.000
Tranport
trip
12
200.000
2.400.000
Acomodation
m/d
24
300.000
7.200.000
Lumpsum
m/d
36
50.000
1.800.000
Tranport
trip
18
300.000
5.400.000
Several transport to Dumai (Remote Village)
trip
6
300.000
1.800.000
Acomodation
m/d
36
300.000
10.800.000
Lumpsum
m/d
54
50.000
2.700.000
From Pekanbaru to Dumai (32 kel x 3% = 13 kel)
From Pekanbaru to Kuantan Singingi & Indragiri Hilir (19 kel x 3% = 9 kel) Tranport
trip
12
400.000
4.800.000
Several transport to Kuansing & Indragiri Hilir (Remote Village)
trip
12
400.000
4.800.000
Acomodation
m/d
36
300.000
10.800.000
Lumpsum
m/d
48
50.000
2.400.000
m/d
72
50.000
3.600.000
From Pekanbaru to Pekanbaru (58 kel x 3% = 23 kel) Lumpsum
2.4.1.2 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM
95.850.000
A. For City Coordinator and Assistance City Coordinator (124 Kel x 50%) x 4
trip
186
50.000
9.300.000
trip
299
50.000
14.950.000
Sea Transport
trip
36
350.000
12.600.000
Tranport
trip
36
200.000
7.200.000
Acomodation
m/d
36
300.000
10.800.000
Lumpsum
trip
72
50.000
3.600.000
Tranport
trip
34
300.000
10.200.000
Acomodation
m/d
34
300.000
10.200.000
Lumpsum
trip
68
50.000
Cost / Day Rp. 50.000.- 1 Day cover 2 kel
B. For Ass. City Coordinator Infrastructure and FM in the city (124 Kel - 34 Kel luar kota) x 50%) x 14 Cost / Day Rp. 50.000.- 1 Day cover 2 kel
C. For City Coordinator Infrastructure and FM out of te town 1
From Pekanbaru to Bengkalis From Dumai to Bengkalis
2
From Pekanbaru to Kuantan Singingi
3.400.000 II.6 // 40 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
3
Rate
From Pekanbaru to Indragiri Hilir Tranport
trip
17
400.000
6.800.000
Acomodation
m/d
17
300.000
5.100.000
Lumpsum
trip
34
50.000
1.700.000
2.4.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL a
c
21.000.000
From Pekanbaru to Bengkalis Sea Transport
b
trip
6
350.000
2.100.000
Tranport
trip
6
200.000
1.200.000
Acomodation
m/d
12
300.000
3.600.000
Lumpsum
m/d
18
50.000
900.000
Tranport
trip
6
300.000
1.800.000
Acomodation
m/d
12
300.000
3.600.000
Lumpsum
m/d
18
50.000
900.000
Tranport
trip
6
400.000
2.400.000
Acomodation
m/d
12
300.000
3.600.000
Lumpsum
m/d
18
50.000
900.000
From Pekanbaru to Kuantan Singingi
From Pekanbaru to Indragiri Hilir
2.4.1.4 FROM KAB/KOTA TO TL OFFICE FOR COORDIANTION MEETING a
b
c
Amount
74.400.000
From Bengkalis to Pekanbaru Sea Transport
trip
16
350.000
5.600.000
Tranport
trip
16
200.000
3.200.000
Acomodation
m/d
32
300.000
9.600.000
OSA
m/d
48
50.000
2.400.000
Tranport
trip
16
300.000
4.800.000
Acomodation
m/d
32
300.000
9.600.000
OSA
m/d
48
50.000
2.400.000
Tranport
trip
32
400.000
12.800.000
Acomodation
m/d
64
300.000
19.200.000
OSA
m/d
96
50.000
4.800.000
From Dumai to Pekanbaru
From Kuantan Singingi & Indragiri Hilir to Pekanbaru
2.4.1.5 FROM PROVINCE TO REGIONAL FOR WORKSHOP & COORDINATION MEETING AT OC
37.800.000
Workshop OC / Coordination Meeting at OC From Pekanbaru to Medan Air Transport
Trip
18
1.500.000
27.000.000
OSA [ Fixed ]
Man/Days
36
100.000
3.600.000
Trip
18
100.000
1.800.000
Local Transport
II.6 // 41 of 67
NO
DESCRIPTION
AMENDEMENT CONTRACT NO. 7
UNIT
Vol Accomodation
Man/Days
Rate
18
300.000
2.4.1.6 FOR SEVERAL TRAINING & SPECIAL EVENT FROM KAB. TO PEKANBARU
Amount 5.400.000
177.100.000
For Training Inlandtransport for Korkot &Askot (5 Kota/Kab) on OSP Consolidation 1
2
From Bengkalis to Pekabaru Sea Transport
trip
6
350.000
2.100.000
Tranport
trip
6
200.000
1.200.000
trip
13
300.000
3.900.000
trip
12
400.000
4.800.000
Sea Transport
trip
9
350.000
3.150.000
Tranport
trip
9
200.000
1.800.000
trip
19
300.000
5.700.000
trip
10
400.000
4.000.000
Sea Transport
trip
-
350.000
-
Tranport
trip
-
200.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
Tranport
trip
-
300.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
Tranport
trip
-
400.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
From Dumai to Pekanbaru Tranport
3
From Kuntan Singingi & Indragiri Hilir to Pekanbaru Tranport
Inland Transport for SF, FK, FE, FS (5 Kota/Kab) 1
2
From Bengkalis to Pekanbaru
From Dumai to Pekanbaru Tranport
3
From Kuantan Singingi & Indragiri Hilir to Pekanbaru Tranport
b
Special Event (by request)
1
From Bengkalis to Pekanbaru
2
3
From Dumai to Pekanbaru
From Kuantan Singingi & Indragiri Hilir to Pekanbaru
BRIDGING (July 2014 to April 2015) 1. Konsolidasi Pemandu Pelatihan Penguatan Pemda dan Stakeholder a. Tranport From Kab to Pekanbaru II.6 // 42 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Amount
- Bengkalis
trip
-
550.000
-
- Dumai
trip
-
300.000
-
- Kuantan Singingi & Indragiri Hilir
trip
-
400.000
-
m/d
-
50.000
-
- Bengkalis
trip
-
550.000
-
- Dumai
trip
-
300.000
-
- Kuantan Singingi & Indragiri Hilir
trip
-
400.000
-
b. OSA
2. Pelatihan Penguatan Pemda dan Stakeholder a. Tranport From Kab to Pekanbaru
3. Konsolidasi Pemandu Pelatihan Penguatan Askot dan Fasilitator a. Tranport From Kab to Pekanbaru - Bengkalis
trip
-
550.000
-
- Dumai
trip
-
300.000
-
- Kuantan Singingi & Indragiri Hilir
trip
-
400.000
-
- Bengkalis
trip
-
550.000
-
- Dumai
trip
-
300.000
-
- Kuantan Singingi & Indragiri Hilir
trip
-
400.000
-
- Bengkalis
trip
-
550.000
-
- Dumai
trip
-
300.000
-
- Kuantan Singingi & Indragiri Hilir
trip
-
400.000
-
- Bengkalis
trip
1
550.000
550.000
- Dumai
trip
1
300.000
300.000
- Kuantan Singingi & Indragiri Hilir
trip
2
400.000
800.000
- Bengkalis
trip
-
550.000
-
- Dumai
trip
-
300.000
-
- Kuantan Singingi & Indragiri Hilir
trip
-
400.000
-
400.000
30.000.000
400.000
39.600.000
4. Pelatihan Penguatan Askot dan Fasilitator a. Tranport From Kab to Pekanbaru
5. Konsolidasi Pemandu Pelatihan PLPBK a. Tranport From Kab to Pekanbaru
6. Pelatihan Dasar PLBPK a. Tranport From Kab to Pekanbaru
7. Pelatihan Penguatan PLPBK a. Tranport From Kab to Pekanbaru
9. Orientasi and Planning Training for Livelihood/PPMK (New Location FY 2014) a. Tranport From Kab to Pekanbaru
trip
75
10. Advance Training for Livelihood/PPMK (Location FY 2012) and (Location 2014) a. Tranport From Kab to Pekanbaru
trip
99
II.6 // 43 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Amount
BRIDGING (Mei to Desember 2015) 1. Konsolidasi Pemandu Pelatihan Pemerintah Daerah a. Tranport From Kab to Pekanbaru
trip
7
400.000
2.800.000
trip
30
400.000
12.000.000
trip
5
400.000
2.000.000
trip
96
400.000
38.400.000
trip
21
400.000
8.400.000
trip
36
400.000
14.400.000
trip
3
400.000
1.200.000
trip
20
400.000
8.000.000
trip
23
400.000
9.200.000
Air Transport
trip
53
1.800.000
83.388.000
In land Travel in Jakarta
trip
53
200.000
9.280.000
OSA
trip
371
100.000
37.100.000
Hotel Accommodation
trip
318
350.000
92.220.000
2. Pelatihan Pemerintah Daerah a. Tranport From Kab to Pekanbaru
3. Konsolidasi Pemandu Pelatihan Penguatan Program Lanjutan a. Tranport From Kab to Pekanbaru
4. Pelatihan Penguatan Program Lanjutan a. Tranport From Kab to Pekanbaru
5. Pelatihan Penguatan PLPBK a. Tranport From Kab to Pekanbaru
6. Pelatihan Penguatan PPMK a. Tranport From Kab to Pekanbaru
7. Pelatihan SIM a. Tranport From Kab to Pekanbaru
8. Pelatihan Khusus Askot MK dan Faskel Ekonomi a. Tranport From Kab to Pekanbaru
9. Pelatihan Aplikasi Pembukuan UPK (Computerize System) a. Tranport From Kab to Pekanbaru
2.4.2 TO JAKARTA 2.4.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST
221.988.000
2.4.2.2 FOR EGM TO JAKARTA
161.533.720
Air Transport EGM TA/SubTA Training
trip
7
1.800.000
9.763.140
EGM TA Sosialisasi
trip
7
1.800.000
9.711.440
EGM TA/SubTA MK/Sub TA RLF
trip
7
1.800.000
9.833.540
EGM TA/SubTA INFRA/Sub TA Safeguard
trip
7
1.800.000
9.866.340
EGM TA/SubTA Monev /Sub TA Legal HCU
trip
7
1.800.000
10.747.740
EGM TA/SubTA SIM
trip
7
1.800.000
9.881.740
EGM TA Local Goverment
trip
7
1.800.000
9.746.640
EGM TA Livelihood & SME's
trip
7
1.800.000
9.763.140 II.6 // 44 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Amount
EGM TA Urban Planner
trip
-
1.800.000
-
In land Transport in Jakarta
trip
56
200.000
9.660.000
OSA
m/d
224
100.000
22.400.000
Hotel Accommodation
trip
168
350.000
50.160.000
2.4.2.3 FOR COORDINATION MEETING TO JAKARTA (by request)
44.850.000
Air Transport
trip
13
1.800.000
23.400.000
In land Transport in Jakarta
trip
13
200.000
2.600.000
OSA
m/d
52
100.000
5.200.000
Hotel Accommodation
m/d
39
350.000
13.650.000
2.4.2.4 FROM PROVINCE (KMW SUMBAR) TO OTHER PROVINCE (by request)
28.750.000
Air Transport
trip
5
4.000.000
20.000.000
In land Transport in Jakarta
trip
5
300.000
1.500.000
Hotel Accommodation
m/d
15
350.000
5.250.000
OSA
m/d
20
100.000
2.000.000
TOTAL DUTY TRAVEL PROVINCE RIAU
925.971.720
II.6 // 45 of 67
II DIRECT REEIMBURSABLE COST 2.7. DUTY TRAVEL EXPENSES PROVINCE KEP. RIAU NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Amount
2.5.1 IN PROVINCE 2.5.1.1 FOR SPOTCHECK PROVINCE TO KELURAHAN (3 % x Number of Kelurahan) a
Lumpsum
b
c
d
75.800.000
From Tanjung Pinang to Bintan (5 kel x 3% = 3 kel) m/d
22
50.000
1.100.000
Sea Transport
trip
30
400.000
12.000.000
Tranport
trip
30
100.000
3.000.000
Acomodation
m/d
90
300.000
27.000.000
Lumpsum
m/d
120
50.000
6.000.000
Sea Transport
trip
20
400.000
8.000.000
Tranport
trip
20
100.000
2.000.000
Acomodation
m/d
40
300.000
12.000.000
Lumpsum
m/d
60
50.000
3.000.000
m/d
34
50.000
1.700.000
From Tanung Pinang to Batam (64 kel x 3% = 29 kel)
From Tanjung Pinang to Karimun (22 kel x 3% = 10 kel)
From Tanjung Pinang to Tanjung Pinang (18 kel x 3% = 10 kel) Lumpsum
2.5.1.2 SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR INFRA AND FM
113.450.000
A. For City Coordinator and Assistance City Coordinator (109 Kel x 50%) x 4
trip
136
50.000
6.800.000
trip
55
300.000
16.500.000
trip
323
50.000
16.150.000
trip
165
300.000
49.500.000
Sea Transport
trip
26
100.000
2.600.000
Transport
trip
26
100.000
2.600.000
Lumpsum
trip
26
50.000
1.300.000
Sea Transport
trip
72
100.000
7.200.000
Transport
trip
72
100.000
7.200.000
Lumpsum
trip
72
50.000
3.600.000
Cost / Day Rp. 50.000.- 1 Day cover 2 kel Various Transport (21 kel x 50%) x 4
B. For Ass. City Coordinator Infrastructure and FM in the city ((109 Kel - 23 Kel luar kota) x 50%) x 14 Cost / Day Rp. 50.000.- 1 Day cover 2 kel Various Transport (21 kel x 50%) x 14
C. For City Coordinator Infrastructure and FM out of te town 1
2
From Batam to Bintan
From Batam to Tanjung Pinang
2.5.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL
3.000.000
II.7 // 46 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
a
b
Rate
Sea Transport
trip
6
100.000
600.000
Tranport
trip
6
100.000
600.000
Lumpsum
trip
6
50.000
300.000
Sea Transport
trip
6
100.000
600.000
Tranport
trip
6
100.000
600.000
Lumpsum
trip
6
50.000
300.000
From Batam to Tanjung Pinang
2.5.1.4 FROM KAB/KOTA TO TL OFFICE FOR COORDIANTION MEETING a
b
38.400.000
From Bintan to Tanjung Pinang Tranport
trip
18
100.000
1.800.000
Acomodation
m/d
18
300.000
5.400.000
OSA
m/d
36
50.000
1.800.000
22
100.000
2.200.000
From Batam to Tanjung Pinang Sea Transport
c
Amount
From Batam to Bintan
Tranport
trip
22
100.000
2.200.000
Acomodation
m/d
22
300.000
6.600.000
OSA
m/d
44
50.000
2.200.000
From Karimun to Tanjung Pinang Sea Transport
18
400.000
7.200.000
Tranport
trip
18
100.000
1.800.000
Acomodation
m/d
18
300.000
5.400.000
OSA
m/d
36
50.000
1.800.000
2.5.1.5 FROM PROVINCE TO REGIONAL FOR WORKSHOP & COORDINATION MEETING AT OC
37.800.000
Workshop OC / Coordination Meeting at OC From Tanjung Pinang to Medan Air Transport
Trip
18
1.500.000
27.000.000
OSA [ Fixed ]
Man/Days
36
100.000
3.600.000
Trip
18
100.000
1.800.000
Man/Days
18
300.000
5.400.000
Local Transport Accomodation
2.5.1.6 FOR SEVERAL TRAINING & SPECIAL EVENT FROM KAB. TO TANJUNG PINANG
133.000.000
For Training Inland Transport for Korkot & Askot (4 Kota/Kab) on OC Consolidation a
From Bintan to Tanjung Pinang Inlandtranport
b
trip
8
100.000
800.000
From Batam to Tanjung Pinang II.7 // 47 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
c
Rate
Amount
Sea Transport
trip
8
100.000
800.000
Tranport
trip
8
100.000
800.000
Sea Transport
trip
11
400.000
4.400.000
Tranport
trip
13
100.000
1.300.000
trip
4
100.000
400.000
Sea Transport
trip
35
100.000
3.500.000
Tranport
trip
35
100.000
3.500.000
Sea Transport
trip
11
400.000
4.400.000
Tranport
trip
11
100.000
1.100.000
Tranport
trip
-
100.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
Sea Transport
trip
-
100.000
-
Tranport
trip
-
100.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
Sea Transport
trip
-
400.000
-
Tranport
trip
-
100.000
-
Acomodation
m/d
-
300.000
-
OSA
m/d
-
50.000
-
From Karimun to Tanjung Pinang
Inland Transport for SF, FT, FE, FS (4 Kota/Kab) a
From Bintan to Tanjung Pinang Inlandtranport
b
c
From Batam to Tanjung Pinang
From Karimun to Tanjung Pinang
Special Event (by request) 1
2
3
From Bintan to Tanjung Pinang
From Batam to Tanjung Pinang
From Karimun to Tanjung Pinang
BRIDGING (July 2014 to April 2015) 1. Konsolidasi Pemandu Pelatihan Penguatan Pemda dan Stakeholder a. Tranport From Kab to Tanjung Pinang - Bintan
trip
-
100.000
-
- Batam
trip
-
100.000
-
- Karimun
trip
-
500.000
-
2. Pelatihan Penguatan Pemda dan Stakeholder a. Tranport From Kab to Tanjung Pinang II.7 // 48 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Amount
- Bintan
trip
-
100.000
-
- Batam
trip
-
100.000
-
- Karimun
trip
-
500.000
-
3. Konsolidasi Pemandu Pelatihan Penguatan Askot dan Fasilitator a. Tranport From Kab to Tanjung Pinang - Bintan
trip
-
100.000
-
- Batam
trip
-
100.000
-
- Karimun
trip
-
500.000
-
- Bintan
trip
-
100.000
-
- Batam
trip
-
100.000
-
- Karimun
trip
-
500.000
-
- Bintan
trip
-
100.000
-
- Batam
trip
-
100.000
-
- Karimun
trip
-
500.000
-
- Bintan
trip
1
100.000
100.000
- Batam
trip
47
100.000
4.700.000
- Karimun
trip
1
500.000
500.000
- Bintan
trip
-
100.000
-
- Batam
trip
-
100.000
-
- Karimun
trip
-
500.000
-
4. Pelatihan Penguatan Askot dan Fasilitator a. Tranport From Kab to Tanjung Pinang
5. Konsolidasi Pemandu Pelatihan PLPBK a. Tranport From Kab to Tanjung Pinang
6. Pelatihan Dasar PLBPK a. Tranport From Kab to Tanjung Pinang
7. Pelatihan Penguatan PLPBK a. Tranport From Kab to Tanjung Pinang
8. Pelatihan Tim Teknis PLPBK a. Tranport From Kab to Tanjung Pinang - Bintan
trip
1
100.000
100.000
- Batam
trip
47
100.000
4.700.000
- Karimun
trip
1
500.000
500.000
300.000
24.600.000
9. Orientasi and Planning Training for Livelihood/PPMK (New Location FY 2014) a. Tranport From Kab to Tanjung Pinang
trip
82
10. Advance Training for Livelihood/PPMK (Location FY 2012) and (Location 2014) a. Tranport From Kab to Tanjung Pinang
trip
92
300.000
27.600.000
II.7 // 49 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Amount
BRIDGING (Mei to Desember 2015) 1. Konsolidasi Pemandu Pelatihan Pemerintah Daerah a. Tranport From Kab to Tanjung Pinang
trip
4
300.000
1.200.000
trip
20
300.000
6.000.000
trip
5
300.000
1.500.000
trip
82
300.000
24.600.000
trip
19
300.000
5.700.000
trip
31
300.000
9.300.000
trip
3
300.000
900.000
trip
18
300.000
5.400.000
trip
21
300.000
6.300.000
2. Pelatihan Pemerintah Daerah a. Tranport From Kab to Tanjung Pinang
3. Konsolidasi Pemandu Pelatihan Penguatan Program Lanjutan a. Tranport From Kab to Tanjung Pinang
4. Pelatihan Penguatan Program Lanjutan a. Tranport From Kab to Tanjung Pinang
5. Pelatihan Penguatan PLPBK a. Tranport From Kab to Tanjung Pinang
6. Pelatihan Penguatan PPMK a. Tranport From Kab to Tanjung Pinang
7. Pelatihan SIM a. Tranport From Kab to Tanjung Pinang
8. Pelatihan Khusus Askot MK dan Faskel Ekonomi a. Tranport From Kab to Tanjung Pinang
9. Pelatihan Aplikasi Pembukuan UPK (Computerize System) a. Tranport From Kab to Tanjung Pinang
2.5.2 TO JAKARTA 2.5.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST
238.382.700
Air Transport
trip
53
1.900.000
81.782.700
In land Travel in Jakarta
trip
53
200.000
9.800.000
OSA
trip
371
100.000
37.100.000
Hotel Accommodation
trip
318
350.000
109.700.000
2.5.2.2 FOR EGM TO JAKARTA
180.447.200
Air Transport 1
EGM TA/SubTA Training
trip
7
1.900.000
11.050.400
2
EGM TA Sosialisasi
trip
7
1.900.000
11.045.400
3
EGM TA/SubTA MK/Sub TA RLF
trip
7
1.900.000
12.073.800
4
EGM TA/SubTA INFRA/Sub TA Safeguard
trip
7
1.900.000
11.869.200
5
EGM TA/SubTA Monev /Sub TA Legal HCU
trip
7
1.900.000
12.067.700
6
EGM TA/SubTA SIM
trip
7
1.900.000
10.376.300
7
EGM TA Local Goverment
trip
7
1.900.000
10.907.800
8
EGM TA Livelihood & SME's
trip
7
1.900.000
11.056.600
9
EGM TA Urban Planner
trip
-
1.900.000
II.7 // 50 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Amount
In land Transport in Jakarta
trip
56
200.000
10.000.000
OSA
m/d
224
100.000
22.400.000
Hotel Accommodation
trip
168
350.000
57.600.000
2.5.2.3 FOR COORDINATION MEETING TO JAKARTA (by request)
46.400.000
Air Transport
trip
13
1.900.000
24.700.000
In land Transport in Jakarta
trip
13
200.000
2.600.000
Hotel Accommodation
m/d
40
350.000
14.000.000
OSA
m/d
51
100.000
5.100.000
2.5.2.4 FROM PROVINCE (KMW SUMBAR) TO OTHER PROVINCE (by request)
28.750.000
Air Transport
trip
5
4.000.000
20.000.000
In land Transport in Jakarta
trip
5
300.000
1.500.000
Hotel Accommodation
m/d
15
350.000
5.250.000
OSA
m/d
20
100.000
2.000.000
TOTAL DUTY TRAVEL PROVINCE KEP. RIAU
895.429.900
II.7 // 51 of 67
II DIRECT REIMBURSABLE COST 2.8. OFFICE OPERATIONAL EXPENSES NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Amount
2.2.1
OFFICE RUNNING COST
778.547.580
2.2.1.1
OC Office
292.890.497
a
Propinsi NAD (Banda Aceh)
mth
9,5
2.000.000
18.516.780
b
Propinsi Sumatera Utara (Medan) including PD
mth
33,5
2.500.000
81.240.118
c
Propinsi Sumatera Barat (Padang)
mth
33,5
2.000.000
62.833.364
d
Propinsi Riau (Pekanbaru)
mth
33,5
2.000.000
65.167.006
e
Propinsi Kep. Riau (Tanjung Pinang)
mth
33,5
2.000.000
65.133.229
2.2.1.2 a
City Coordinator Office Propinsi NAD (8 Kota/Kab)
b
a
e
500.000
128.074.828
mth
165,0
500.000
80.889.188
mth
66,0
500.000
32.548.902
mth
66,0
500.000
32.737.503
181.032.355
mth
45,0
300.000
13.097.370
mth
198,0
300.000
58.099.350
mth
198,0
300.000
58.642.352
(3 Kota/Kab)
mth
99,0
300.000
29.470.285
(Kab. Rokan Hulu), Kab. Non P2KP
mth
7,0
300.000
2.100.000
mth
66,0
300.000
19.622.998
Propinsi Sumatera Utara
Propinsi Sumatera Barat (7 Kota/Kab)
d
264,0
Propinsi NAD
(6 Kota/Kab) c
mth
Assitant CD City Coordinator Office
(5 Kota/Kab) b
30.374.307
Propinsi Kep. Riau (2 Kota/Kab)
2.2.1.3
500.000
Propinsi Riau (2 Kota/Kab)
e
63,0
Propinsi Sumatera Barat (5 Kota/Kab)
d
mth
Propinsi Sumatera Utara (8 Kota/Kab)
c
304.624.728
Propinsi Riau
Propinsi Kep. Riau (2 Kota/Kab)
2.2.2
OFFICE SUPPLY & CONSUMABLE
2.2.2.1
OC Office
1.333.795.208 424.985.360
a
Propinsi NAD (Banda Aceh)
mth
9,5
3.000.000
28.389.200
b
Propinsi Sumatera Utara (Medan) including PD
mth
33,5
4.000.000
132.192.125
c
Propinsi Sumatera Barat (Padang)
mth
33,5
3.000.000
99.420.585
d
Propinsi Riau (Pekanbaru)
mth
33,5
2.500.000
82.062.550
e
Propinsi Kep. Riau (Tanjung Pinang)
mth
33,5
2.500.000
82.920.900 II.8 // 52 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
2.2.2.2 a
City Coordinator Office
a
e
264,0
1.000.000
253.998.153
mth
165,0
1.000.000
161.815.770
mth
66,0
1.000.000
65.190.800
mth
66,0
1.000.000
64.644.050
301.563.375
mth
45,0
500.000
21.931.950
mth
198,0
500.000
98.177.900
mth
198,0
500.000
96.316.725
(3 Kota/Kab)
mth
99,0
500.000
49.187.800
(Kab. Rokan Hulu), Kab. Non P2KP
mth
7,0
500.000
3.500.000
mth
66,0
500.000
32.449.000
Propinsi Sumatera Utara
Propinsi Sumatera Barat (7 Kota/Kab)
d
mth
Propinsi NAD
(6 Kota/Kab)
c
61.597.700
Assitant CD City Coordinator Office
(5 Kota/Kab)
b
1.000.000
Propinsi Kep. Riau (2 Kota/Kab)
2.2.2.3
63,0
Propinsi Riau (2 Kota/Kab)
e
mth
Propinsi Sumatera Barat (5 Kota/Kab)
d
607.246.473
Propinsi Sumatera Utara (8 Kota/Kab)
c
Amount
Propinsi NAD (8 Kota/Kab)
b
Rate
Propinsi Riau
Propinsi Kep. Riau (2 Kota/Kab)
2.2.3
COMMUNICATION COST
722.997.817
2.2.3.1
OC Office
354.040.854
a
Propinsi NAD (Banda Aceh)
mth
9,5
2.000.000
9.838.035
b
Propinsi Sumatera Utara (Medan) including PD
mth
33,5
3.000.000
96.593.240
Internet for Prov. Sumatera Utara (Medan) including PD
mth
24,0
1.000.000
24.000.000
Propinsi Sumatera Barat (Padang)
mth
33,5
2.000.000
61.895.406
Internet for Prov. Sumatera Barat (Padang)
mth
23,0
1.000.000
23.000.000
Propinsi Riau (Pekanbaru)
mth
33,5
1.500.000
46.866.584
Internet for Prov. (Pekanbaru)
mth
23,0
1.000.000
23.000.000
Propinsi Kep. Riau (Tanjung Pinang)
mth
33,5
1.500.000
46.847.589
Internet for Prov. Riau (Tanjung Pinang)
mth
22,0
1.000.000
22.000.000
c
d
e
II.8 // 53 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
2.2.3.2 a
City Coordinator Office
a
e
264,0
500.000
131.194.650
mth
165,0
500.000
64.191.276
mth
66,0
500.000
27.852.722
mth
66,0
500.000
27.469.555
99.371.879
mth
45,0
250.000
5.064.451
mth
198,0
250.000
49.470.430
mth
113,0
250.000
20.479.358
(3 Kota/Kab)
mth
55,0
250.000
9.510.500
(Kab. Rokan Hulu), Kab. Non P2KP
mth
7,0
250.000
1.750.000
mth
53,0
250.000
13.097.140
Propinsi Sumatera Utara
Propinsi Sumatera Barat (7 Kota/Kab)
d
mth
Propinsi NAD
(6 Kota/Kab) c
18.876.881
Assitant CD City Coordinator Office
(5 Kota/Kab) b
500.000
Propinsi Kep. Riau (2 Kota/Kab)
2.2.3.3
63,0
Propinsi Riau (2 Kota/Kab)
e
mth
Propinsi Sumatera Barat (5 Kota/Kab)
d
269.585.084
Propinsi Sumatera Utara (8 Kota/Kab)
c
Amount
Propinsi NAD (8 Kota/Kab)
b
Rate
Propinsi Riau
Propinsi Kep. Riau (2 Kota/Kab) TOTAL OF OFFICE OPERATIONAL EXPENSES
2.835.340.605
II.8 // 54 of 67
II DIRECT REEIMBURSABLE COST 2.9. OFFICE EQUIPMENT EXPENSES NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
2.6
Rate
OC OFFICE
2.6.1.1
Amount 704.800.000
Propinsi Sumatera Utara (Medan)
171.600.000
a
Desktop Computer (Purchase)
Unit
9
6.500.000
56.700.000
b
Laptop/Notebook (Purchase)
Unit
11
7.500.000
79.750.000
c
Printer Laser Jet (Purchase)
Unit
3
1.750.000
4.800.000
d
Printer Color A3 (Purchase)
Unit
1
2.750.000
2.650.000
e
Digital Camera (Purchase)
Unit
1
2.500.000
2.500.000
f
GPS tools (Purchase)
Unit
1
3.500.000
3.250.000
g
LCD Projector (Purchase)
Unit
1
5.000.000
4.750.000
h
Scanner (Purchase)
Unit
2
1.200.000
2.200.000
i
Equipment Maintenance (Include existing equipment)
Atcost
1
15.000.000
15.000.000
2.6.1.2
Propinsi NAD (Banda Aceh)
136.450.000
a
Desktop Computer (Purchase)
Unit
5
6.500.000
31.500.000
b
Laptop/Notebook (Purchase)
Unit
10
7.500.000
72.500.000
c
Printer Laser Jet (Purchase)
Unit
2
1.750.000
3.200.000
d
Printer Color A3 (Purchase)
Unit
1
2.750.000
2.650.000
e
Digital Camera (Purchase)
Unit
1
2.500.000
2.500.000
f
GPS tools (Purchase)
Unit
1
3.500.000
3.250.000
g
5.000.000
4.750.000
LCD Projector (Purchase)
Unit
1
h
Scanner (Purchase)
Unit
1
1.200.000
1.100.000
i
Equipment Maintenance (Include existing equipment)
Atcost
1
15.000.000
15.000.000
2.6.1.3
Propinsi Sumatera Barat (Padang)
136.450.000
a
Desktop Computer (Purchase)
Unit
5
6.500.000
31.500.000
b
Laptop/Notebook (Purchase)
Unit
10
7.500.000
72.500.000
c
Printer Laser Jet (Purchase)
Unit
2
1.750.000
3.200.000
d
Printer Color A3 (Purchase)
Unit
1
2.750.000
2.650.000
e
Digital Camera (Purchase)
Unit
1
2.500.000
2.500.000
f
GPS tools (Purchase)
Unit
1
3.500.000
3.250.000
g
LCD Projector (Purchase)
Unit
1
5.000.000
4.750.000
h
Scanner (Purchase)
Unit
1
1.200.000
1.100.000
i
Equipment Maintenance (Include existing equipment)
Atcost
1
15.000.000
15.000.000
2.6.1.4
Propinsi Riau (Pekanbaru)
130.150.000
a
Desktop Computer (Purchase)
Unit
4
6.500.000
25.200.000
b
Laptop/Notebook (Purchase)
Unit
10
7.500.000
72.500.000
c
Printer Laser Jet (Purchase)
Unit
2
1.750.000
3.200.000
d
Printer Color A3 (Purchase)
Unit
1
2.750.000
2.650.000
e
Digital Camera (Purchase)
Unit
1
2.500.000
2.500.000
f
GPS tools (Purchase)
Unit
1
3.500.000
3.250.000
g
LCD Projector (Purchase)
Unit
1
5.000.000
4.750.000
h
Scanner (Purchase)
Unit
1
1.200.000
1.100.000 II.9 // 55 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
i
2.6.1.5
Equipment Maintenance (Include existing equipment)
Atcost
Rate 1
15.000.000
Propinsi Kep. Riau (Tanjung Pinang)
Amount 15.000.000
130.150.000
a
Desktop Computer (Purchase)
Unit
4
6.500.000
25.200.000
b
Laptop/Notebook (Purchase)
Unit
10
7.500.000
72.500.000
c
Printer Laser Jet (Purchase)
Unit
2
1.750.000
3.200.000
d
Printer Color A3 (Purchase)
Unit
1
2.750.000
2.650.000
e
Digital Camera (Purchase)
Unit
1
2.500.000
2.500.000
f
GPS tools (Purchase)
Unit
1
3.500.000
3.250.000
g
LCD Projector (Purchase)
Unit
1
5.000.000
4.750.000
h
Scanner (Purchase)
Unit
1
1.200.000
1.100.000
i
Equipment Maintenance (Include existing equipment)
Atcost
1
15.000.000
15.000.000
2.6.2
CITY COORDINATOR OFFICE
432.500.000
2.6.2.1
Propinsi NAD (8 Korkot)
138.400.000
a
Laptop/Notebook (Purchase)
Unit
8
7.500.000
58.000.000
b
Desktop Computer (Purchase)
Unit
8
6.500.000
50.400.000
c
Printer Color A3 (Purchase)
Unit
8
2.750.000
21.200.000
d
Scanner (Purchase)
Unit
8
1.200.000
8.800.000
2.6.2.2
Propinsi Sumatera Utara (8 Korkot)
138.400.000
a
Laptop/Notebook (Purchase)
Unit
8
7.500.000
58.000.000
b
Desktop Computer (Purchase)
Unit
8
6.500.000
50.400.000
c
Printer Color A3 (Purchase)
Unit
8
2.750.000
21.200.000
d
Scanner (Purchase)
Unit
8
1.200.000
8.800.000
2.6.2.3
Propinsi Sumatera Barat (5 Korkot)
86.500.000
a
Laptop/Notebook (Purchase)
Unit
5
7.500.000
36.250.000
b
Desktop Computer (Purchase)
Unit
5
6.500.000
31.500.000
c
Printer Color A3 (Purchase)
Unit
5
2.750.000
13.250.000
d
Scanner (Purchase)
Unit
5
1.200.000
5.500.000
2.6.2.4
Propinsi Riau (2 Korkot)
34.600.000
a
Laptop/Notebook (Purchase)
Unit
2
7.500.000
14.500.000
b
Desktop Computer (Purchase)
Unit
2
6.500.000
12.600.000
c
Printer Color A3 (Purchase)
Unit
2
2.750.000
5.300.000
d
Scanner (Purchase)
Unit
2
1.200.000
2.200.000
2.6.2.5
Propinsi Kep. Riau (2 Korkot)
34.600.000
a
Laptop/Notebook (Purchase)
Unit
2
7.500.000
14.500.000
b
Desktop Computer (Purchase)
Unit
2
6.500.000
12.600.000
c
Printer Color A3 (Purchase)
Unit
2
2.750.000
5.300.000
d
Scanner (Purchase)
Unit
2
1.200.000
2.200.000
2.6.3
ASSISTAN CD MANDIRI OFFICE
167.900.000 II.9 // 56 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
2.6.3.1
Rate
Propinsi NAD (5 AsKorkot CD MAndiri)
Amount 36.500.000
a
Desktop Computer (Purchase)
Unit
5
6.500.000
31.500.000
b
Printer InkJet (Purchase)
Unit
5
1.300.000
5.000.000
2.6.3.2
Propinsi Sumatera Utara ( 6 AsKorkot CD MAndiri)
43.800.000
a
Desktop Computer (Purchase)
Unit
6
6.500.000
37.800.000
b
Printer InkJet (Purchase)
Unit
6
1.300.000
6.000.000
2.6.3.3
Propinsi Sumatera Barat ( 7 AsKorkot CD MAndiri)
51.100.000
a
Desktop Computer (Purchase)
Unit
7
6.500.000
44.100.000
b
Printer InkJet (Purchase)
Unit
7
1.300.000
7.000.000
2.6.3.4
Propinsi Riau ( 3 AsKorkot CD Mandiri)
21.900.000
a
Desktop Computer (Purchase)
Unit
3
6.500.000
18.900.000
b
Printer InkJet (Purchase)
Unit
3
1.300.000
3.000.000
2.6.3.5
Propinsi Kep. Riau ( 2 AsKorkot CD Mandiri)
14.600.000
a
Desktop Computer (Purchase)
Unit
2
6.500.000
12.600.000
b
Printer InkJet (Purchase)
Unit
2
1.300.000
2.000.000
TOTAL OF OFFICE EQUIPMENT EXPENSES
1.305.200.000
II.9 // 57 of 67
II DIRECT REEIMBURSABLE COST 2.10. RENTAL EXPENSES NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Amount
2.7.1
OC OFFICE SPACE (including furniture, AC etc)
2.7.1.1
NAD (Banda Aceh)
m2/mth
3.328
45.000
149.600.000
2.7.1.2
Sumatera Utara (Medan)
m2/mth
9.520
45.000
428.400.000
2.7.1.3
Sumatera Barat (Padang)
m2/mth
7.072
45.000
315.960.000
2.7.1.4
Riau (Pekanbaru)
m2/mth
5.610
45.000
251.750.000
2.7.1.5
Kep. Riau (Tanjung Pinang)
m2/mth
5.372
45.000
241.580.000
2.7.1.6
For City Coordinator (48)
m2/mth
22.248 17
25.000
556.200.000
2.7.2
VEHICLES (Minimun Y 2010 - Included driver, O & M, Insurance etc) for OC Office
2.7.2.1
NAD (Banda Aceh)
unit/mth
19
7.000.000
129.500.000
2.7.2.2
Sumatera Utara (Medan)
unit/mth
100
7.000.000
700.000.000
2.7.2.3
Sumatera Barat (Padang)
unit/mth
67
7.000.000
465.500.000
2.7.2.4
Riau (Pekanbaru)
unit/mth
67
7.000.000
465.500.000
2.7.2.5
Kep. Riau (Tanjung Pinang)
unit/mth
67
7.000.000
469.000.000
2.7.3 2.7.3.1
2.7.4
MOTORCYCLE (Minimun Year 2010 Included O & M, Insurance etc)For Assistant CD Mnandiri of City Coordinators
2.7.4.1
NAD (5 Kota/Kab)
unit/mth
264
7.000.000
1.848.000.000
unit/mth
165
7.000.000
1.155.000.000
unit/mth
67
7.000.000
465.500.000
unit/mth
67
7.000.000
469.000.000
312.000.000
48
500.000
23.750.000
unit/mth
201
500.000
100.500.000
unit/mth
201
500.000
100.500.000
(3 Kota/Kab)
unit/mth
101
500.000
50.250.000
(Kab. Rokan Hulu), Kab. Non P2KP
unit/mth
7
500.000
3.500.000
Sumatera Utara
Sumatera Barat (7 Kota/Kab)
2.7.4.4
441.000.000
unit/mth
(6 Kota/Kab) 2.7.4.3
7.000.000
Kep. Riau (2 Kota/Kab)
2.7.4.2
63
Riau (2 Kota/Kab)
2.7.3.5
unit/mth
Sumatera Barat (5 Kota/Kab)
2.7.3.4
4.378.500.000
Sumatera Utara (8 Kota/Kab)
2.7.3.3
2.229.500.000
VEHICLES (Minimun Year 2010 - Included driver, O & M, Insurance etc) for City Coordinator Office NAD (8 Kota/Kab)
2.7.3.2
1.943.490.000
Riau
II.10 // 58of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
2.7.4.5
Rate
Amount
Kep. Riau (2 Kota/Kab) TOTAL OF RENTAL EXPENSES
unit/mth
67
500.000
33.500.000 8.863.490.000
II.10 // 59of 67
II DIRECT REEIMBURSABLE COST 2.11. REPORTING EXPENSES NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
2.5.1
Rate
REGULAR REPORT
Amount 20.000.000
a
Inception Report
Ekp
15
50.000
750.000
b
Monthly Report
Ekp
315
25.000
7.875.000
c
Quarterly Report
Ekp
135
35.000
4.725.000
d
Annual Report
Ekp
45
50.000
2.250.000
e
Draft Final Report
Ekp
20
50.000
1.000.000
f
Final Report (Indonesia & English)
Ekp
40
50.000
2.000.000
g
Executive Summary (Indonesia & English)
Ekp
40
35.000
1.400.000
2.5.2
SPECIAL REPORT
5.900.000
a
Performance Evaluation of OC
Ekp
60
35.000
2.100.000
b
Complaint Resolution Follow-up Report
Ekp
80
30.000
2.400.000
c
Workshop Findings and Results
Ekp
40
35.000
1.400.000
TOTAL REPORTING EXPENSES
25.900.000
II.11 // 60 of 67
3. BREAKDOWN OF TRAINING ACTIVITY NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
3.3.1 a
3.3.2 a
Rate
IN REGIONAL LEVELS Rakor OC (4 kali dalam 1 tahun)
Amount 40.629.000
m/d
152
250.000
37.900.000
- Kits
piece
56
50.000
2.729.000
- Speaker honorarium
pers
-
500.000
-
IN PROVINCIAL LEVELS
777.760.825
OC Consolidation : OC Consolidation Sumatera Utara
m/d
368
100.000
36.800.000
OC Consolidation NAD
m/d
148
100.000
14.677.400
OC Consolidation Sumatera Barat
m/d
258
100.000
25.725.625
OC Consolidation Riau
m/d
128
100.000
12.630.000
OC Consolidation Kep. Riau
m/d
114
100.000
11.271.600
- Propinsi Sumatera Utara
m/d
305
75.000
22.875.000
- Propinsi NAD
m/d
410
75.000
30.750.000
- Propinsi Sumatera Barat
m/d
545
75.000
40.881.000
- Propinsi Riau
m/d
108
75.000
8.078.500
- Propinsi Kep. Riau
m/d
65
75.000
4.851.000
c
Advance Training/Couching PLPBK for City Coordinator
m/d
-
175.000
-
d
Training for City Coordinators Assistants (Infrastructure, Economic, Community Dev, MIS, Urban Planner)
m/d
481
175.000
83.992.000
e
Special Training for Kelurahan Facilitators (Technic)
m/d
981
175.000
170.515.400
f
Special Training for Kelurahan Facilitators (Economic)
m/d
581
175.000
101.500.700
g
Special Training for Kelurahan Facilitators (Social)
m/d
696
175.000
121.696.850
h
Special Training for Senior Facilitators
m/d
524
175.000
91.515.750
i
Pelatihan Dasar Pemda
-
175.000
-
Pelatihan Dasar Pemda
-
350.000
-
Training of AKP & Planning for Local Goverment
-
175.000
-
Training of AKP & Planning for Local Goverment
-
350.000
-
k
Special Training for Technical Team of PLPBK
-
175.000
-
l
Training of Poverty Budgeting for Local Government
-
175.000
-
Training of Poverty Budgeting for Local Government
-
350.000
-
b
j
Pelatihan Penguatan PLPBK :
m
Speaker honorarium
pers
-
500.000
-
n
Training for Local Auditor Prov. Sumut
m/d
-
350.000
-
- Kits (Training Material)
piece
-
75.000
-
- Honorarium (Narasumber & Pemandu)
pers
-
500.000
-
3.3.3
In City/Regency Levels
214.669.300
a
Diskusi/refleksi tematik KBP
m/d
582
75.000
43.523.800
b
Konsolidasi Faskel, Askot, Korkot
m/d
3.424
50.000
171.145.500
TOTAL TRAINING ACTIVITY (MAR 2013 S/D JUN 2014
1.033.059.125
BRIDGING PERIODE JULI 2014 up to APRIL 2015 III.3 // 61 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
3.3.1 a
3.3.2 a
Rate
IN REGIONAL LEVELS Rakor OC (4 kali dalam 1 tahun)
Amount 16.300.000
m/d
52
250.000
13.000.000
- Kits
piece
26
50.000
1.300.000
- Speaker honorarium
pers
4
500.000
2.000.000
IN PROVINCIAL LEVELS
2.089.767.500
OC Consolidation : - OC Consolidation Sumatera Utara
m/d
42
100.000
4.200.000
- OC Consolidation Sumatera Barat
m/d
34
100.000
3.400.000
- OC Consolidation Riau
m/d
21
100.000
2.100.000
- OC Consolidation Kep. Riau
m/d
20
100.000
2.000.000
b
Konsolidasi Pemandu Pelatihan Penguatan Pemda dan Stakeholder
m/d
-
350.000
-
c
Pelatihan Penguatan Pemda dan Stakeholder
m/d
-
350.000
-
d
Konsolidasi Pemandu Pelatihan Penguatan Askot dan Fasilitator
m/d
-
175.000
-
e
Pelatihan Penguatan Askot dan Fasilitator
m/d
-
175.000
-
f
Konsolidasi Pemandu Pelatihan PLPBK
m/d
-
175.000
-
g
Pelatihan Dasar PLBPK
m/d
1.224
175.000
214.142.500
h
Pelatihan Penguatan PLPBK
m/d
-
175.000
-
i
Pelatihan Tim Teknis PLPBK
m/d
208
175.000
36.400.000
m/d
4.935
175.000
863.625.000
m/d
5.508
175.000
963.900.000
j k
3.3.3
Orientasi and Planning Training for Livelihood/PPMK (New Location FY 2014) Advance Training for Livelihood/PPMK (Location FY 2012) and (Location 2014)
In City/Regency Levels
153.300.000
a
Pelatihan Aplikasi Pembukuan UPK (computerize system)
m/d
-
175.000
-
b
Diskusi/refleksi tematik KBP
m/d
1.360
75.000
102.000.000
c
Konsolidasi Faskel, Askot, Korkot
m/d
1.026
50.000
51.300.000
d
Pelatihan Pegembangan Federasi UPK
m/d
-
175.000
-
e
Pelatihan Pengelolaan BDC
m/d
-
175.000
-
TOTAL TRAINING ACTIVITY (BRIDGING)
2.259.367.500
BRIDGING PERIODE MEI up to DESEMBER 2015 3.3.1 a
3.3.2 a
IN REGIONAL LEVELS Rakor OC (4 kali dalam 1 tahun)
24.000.000 m/d
80
250.000
20.000.000
- Kits
piece
- Speaker honorarium
pers
40
50.000
2.000.000
4
500.000
2.000.000
IN PROVINCIAL LEVELS
1.876.900.000
OC Consolidation : - OC Consolidation Sumatera Utara
m/d
86
100.000
8.600.000
- OC Consolidation Sumatera Barat
m/d
72
100.000
7.200.000 III.3 // 62 of 67
NO
DESCRIPTION
UNIT
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Amount
- OC Consolidation Riau
m/d
42
100.000
4.200.000
- OC Consolidation Kep. Riau
m/d
40
100.000
4.000.000
b
Konsolidasi Pemandu Pelatihan Pemerintah Daerah
m/d
57
350.000
19.950.000
c
Pelatihan Pemerintah Daerah
m/d
600
350.000
210.000.000
d
Konsolidasi Pemandu Pelatihan Penguatan Program Lanjutan
m/d
49
175.000
8.575.000
e
Pelatihan Penguatan Program Lanjutan
m/d
4.695
175.000
821.625.000
f
Pelatihan Penguatan PLPBK
m/d
636
175.000
111.300.000
g
Pelatihan Tim Teknis PLPBK (Sumbar)
m/d
236
350.000
82.600.000
h
Pelatihan Penguatan PPMK
m/d
1.670
175.000
292.250.000
i
Pelatihan SIM
m/d
102
175.000
17.850.000
j
Pelatihan Khusus Askot MK dan Faskel Ekonomi
m/d
555
175.000
97.125.000
k
Pelatihan Aplikasi Pembukuan UPK (Computerize System)
m/d
1.095
175.000
191.625.000
3.3.3
In City/Regency Levels
1.540.900.000 m/d
1.492
75.000
111.900.000
m/d
2.811
50.000
140.550.000
c
Thematic Discussion / Reflection of KBP, City Changer, Forum BKM Consolidation of Kelurahan Facilitator, City Coordinator, Assistentc & City Coordinators Pelatihan Aplikasi Pembukuan UPK (computerize system)
m/d
6.755
175.000
1.182.125.000
d
Pelatihan Pegembangan Federasi UPK
m/d
384
175.000
67.200.000
e
Pelatihan Pengelolaan BDC (3 Kab/Kota)
m/d
215
175.000
37.625.000
Speaker Honorarium
pers
3
500.000
1.500.000
a b
TOTAL TRAINING ACTIVITY (BRIDGING MEI up to DESEMBER 2015)
3.441.800.000
TOTAL TRAINING ACTIVITY
6.734.226.625
III.3 // 63 of 67
IV. SOCIALIZATION ACTIVITY EXPENSES [ FIXED ] No
Description
Unit
AMENDEMENT CONTRACT NO. 7 Vol
Rate
Amount
4.1.
PROVINCIAL LEVELS (Prov. Sumatera Utara, NAD, Sumatera Barat, Riau & Kep. Riau)
229.199.400
4.1.1.
Lokakarya Review Propinsi/midterm
118.011.900
a
Kegiatan Lokakarya - Propinsi Sumatera Utara
m/d
100
250.000
25.000.000
- Propinsi NAD
m/d
92
250.000
23.000.000
- Propinsi Sumatera Barat
m/d
88
250.000
22.000.000
- Propinsi Riau
m/d
49
250.000
12.250.000
- Propinsi Kep. Riau
m/d
60
250.000
15.000.000
b
Press Conference
m/d
23
250.000
5.550.000
c
Nara Sumber Provinsi
m/d
10
500.000
4.700.000
d
Kits Lokakarya
pcs
212
50.000
10.511.900
4.1.2
Workshop Media
53.687.500
a
Kegiatan Workshop
m/d
195
250.000
48.503.000
b
Narasumber Workshop
m/d
6
500.000
2.700.000
c
Kits Workshop
pcs
51
50.000
2.484.500
4.1.3
Penulisan Artikel / Berita
time
5
1.000.000
5.000.000
4.1.4.
TV Talkshow
time
7
7.500.000
52.500.000
4.2.
CITY/REGENCY LEVELS
4.2.1
Lokakarya Review /midterm
661.189.500
- Kegiatan Lokakarya
m/d
3.220
125.000
402.429.300
- Press Conference
m/d
199
125.000
24.645.700
- Nara Sumber Provinsi
m/d
48
300.000
14.200.000
4.2.2
Radio Talkshow
time
144
500.000
71.900.000
4.2.3
Media Field Visit
time
45
500.000
22.500.000
4.2.4
Penulisan Artikel / Berita
time
122
500.000
61.000.000
4.2.5
Exibithion
time
14
5.000.000
64.514.500 IV // 64 of 67
TOTAL SOCIAL ACTIVITY (MAR 2013 S/D JUN 2014)
890.388.900
BRIDGING PERIODE JULI 2014 up to APRIL 2015 4.1.
PROVINCIAL LEVELS (Prov. Sumatera Utara, NAD, Sumatera Barat, Riau & Kep. Riau)
205.700.000
4.1.1. Lokakarya Review Propinsi/midterm a
90.700.000
Kegiatan Lokakarya - Propinsi Sumatera Utara
m/d
150
250.000
37.500.000
- Propinsi Sumatera Barat
m/d
150
250.000
37.500.000
- Propinsi Riau
m/d
-
250.000
-
- Propinsi Kep. Riau
m/d
-
250.000
-
b
Press Conference
m/d
20
250.000
5.000.000
c
Nara Sumber Provinsi
m/d
4
500.000
2.000.000
d
Kits Lokakarya
pcs
174
50.000
8.700.000
4.1.2
Workshop Media
47.000.000
a
Kegiatan Workshop
m/d
156
250.000
39.000.000
b
Narasumber Workshop
m/d
8
500.000
4.000.000
c
Kits Workshop
pcs
80
50.000
4.000.000
4.1.3
Penulisan Artikel / Berita
time
8
1.000.000
8.000.000
4.1.4.
TV Talkshow
time
8
7.500.000
60.000.000
4.2.
CITY/REGENCY LEVELS
4.2.1
Lokakarya Review /midterm
683.700.000
- Kegiatan Lokakarya
m/d
3.840
125.000
480.000.000
- Press Conference
m/d
320
125.000
40.000.000
- Nara Sumber Provinsi
m/d
64
300.000
19.200.000
4.2.2
Radio Talkshow
time
87
500.000
43.500.000
4.2.3
Media Field Visit
time
67
500.000
33.500.000
4.2.4
Penulisan Artikel / Berita
time
85
500.000
42.500.000
4.2.5
Exibithion
time
5
5.000.000
25.000.000
4.2.6
Workshop "BDC" di 15 Kab/Kota IV // 65 of 67
4.2.7
- Kegiatan Lokakarya
m/d
-
225.000
-
- Press Conference
m/d
-
250.000
-
- Nara Sumber
m/d
-
300.000
-
- Kits Lokakarya
pcs
-
50.000
-
- Kegiatan Lokakarya
m/d
-
225.000
-
- Press Conference
m/d
-
250.000
-
- Nara Sumber
m/d
-
300.000
-
- Kits Lokakarya
pcs
-
50.000
-
Workshop Federasi UPK di 3 Kab/Kota
TOTAL SOCIAL ACTIVITY (BRIDGING)
889.400.000
BRIDGING PERIODE MEI up to DESEMBER 2015 1 1,1
PROVINCIAL LEVELS
352.000.000
Lokakarya Sosialisasi Kumuh
a
Kegiatan Lokakarya
m/d
800
250.000
200.000.000
b
Press Conference
m/d
20
200.000
4.000.000
c
Nara Sumber Provinsi
m/d
12
500.000
6.000.000
d
Kits Lokakarya
Pc
500
50.000
25.000.000
1,2
Workshop Media
a
Kegiatan Workshop
m/d
160
250.000
40.000.000
b
Narasumber Workshop
m/d
8
500.000
4.000.000
c
Kits Workshop
Pc
100
50.000
5.000.000
1,3
Penulisan Artikel / Berita
time
8
1.000.000
8.000.000
1,4
TV Talkshow
time
8
7.500.000
60.000.000
2 2,1
CITY/REGENCY LEVELS
2.777.500.000
Lokakarya Sosialisasi Kumuh - Kegiatan Lokakarya
m/d
4.200
250.000
1.050.000.000
- Press Conference
m/d
350
100.000
35.000.000
- Nara Sumber Provinsi
m/d
175
300.000
52.500.000
2,2
Workshop "BDC" di 15 Kab/Kota (OC1=3, OC2=5, OC3=2, OC4=5)
m/d
360
250.000
90.000.000
2,3
Workshop Federasi UPK di 3 Kab/Kota (OC-1; OC-3 dan OC-4)
m/d
600
250.000
150.000.000
2,4
Lokakarya PLPBK
m/d
4.200
250.000
1.050.000.000
2,5
Radio Talkshow
time
140
500.000
70.000.000 IV // 66 of 67
2,5
Media Field Visit
time
70
500.000
35.000.000
2,6
Penulisan Berita
time
140
500.000
70.000.000
2,5
Exhibition
time
35
5.000.000
175.000.000
TOTAL SOCIAL ACTIVITY (BRIDGING)
3.129.500.000
TOTAL OF SOCIAL ACTIVITY
4.909.288.900
IV // 67 of 67