TESIS
HUBUNGAN KOMPETENSI PROJECT MANAGER TERHADAP KEBERHASILAN PROYEK KONSTRUKSI GEDUNG
IDA AYU ARI BRAHMANTARIGUNA
PROGRAM PASCASARJANA UNIVERSITAS UDAYANA DENPASAR 2015
TESIS
HUBUNGAN KOMPETENSI PROJECT MANAGER TERHADAP KEBERHASILAN PROYEK KONSTRUKSI GEDUNG
IDA AYU ARI BRAHMANTARIGUNA NIM 1391561019
PROGRAM MAGISTER PROGRAM STUDI TEKNIK SIPIL PROGRAM PASCASARJANA UNIVERSITAS UDAYANA DENPASAR 201
HUBUNGAN KOMPETENSI PROJECT MANAGER TERHADAP KEBERHASILAN PROYEK KONSTRUKSI GEDUNG
Tesis untuk Memperoleh Gelar Magister Pada Program Magister, Program Studi Teknik Sipil Program Pascasarjana Universitas Udayana
IDA AYU ARI BRAHMANTARIGUNA NIM 1391561019
PROGRAM MAGISTER PROGRAM STUDI TEKNIK SIPIL PROGRAM PASCASARJANA UNIVERSITAS UDAYANA DENPASAR 2015
Lembar Pengesahan
TESIS INI TELAH DISETUJUI Tanggal, 5 Agustus 2015
Pembimbing I
Pembimbing II
(GAP. Candra Dharmayanti, ST., MSc., PhD) NIP. 19730715 200112 2 001 003
(Ir. I Wayan Yansen, MT) NIP. 19560601 198303 1
Mengetahui
Ketua Program Studi Magister Teknik Sipil Program Pascasarjana Universitas Udayana
(Putu Alit Suthanaya, ST., MEngSc.,PhD) NIP. 19690805 199503 1 001
Direktur Program Pascasarjana Universitas Udayana
(Prof. Dr. dr. A. A. Raka Sudewi, Sp. S (K)) NIP. 19590215 198510 2 001
Lembar Penetapan Panitia Penguji Tesis
TESIS INI TELAH DIUJI PADA Tanggal, 5 Agustus 2015
Panitia Penguji Tesis Berdasarkan SK Rektor Universitas Udayana No. 2337/UN.14.4/HK/2015, tanggal 3 Agustus 2015
Ketua
: GAP. Candra Dharmayanti, ST., MSc., Ph.D
Sekretaris
: Ir. I Wayan Yansen, MT
Anggota
:
1.
Dr. Ir. Dewa Ketut Sudarsana, MT
2.
Ir. Nyoman Martha Jaya, MConstMgt., Ph.D
3.
Ir. Gede Astawa Diputra, MT
SURAT PERNYATAAN BEBAS PLAGIAT
Saya yang bertanda tangan di bawah ini :
Nama
: Ida Ayu Ari Brahmantariguna
NIM
: 1391561019
Program Studi/Konsentrasi
:
Magister
Teknik
Sipil/Manajemen
Proyek
Konstruksi Judul Tesis
: Hubungan Kompetensi Project Manager Terhadap Keberhasilan Proyek Konstruksi Gedung
Dengan ini saya menyatakan bahwa karya ilmiah tesis ini bebas dari plagiat. Apabila dikemudian hari terbukti terdapat plagiat dalam karya ilmiah ini, maka saya bersedia menerima sanksi sesuai peraturan Mendiknas RI No. 17 Tahun 2010 dan peraturan perundangan yang berlaku.
Denpasar, Agustus 2015 Yang Menyatakan,
Ida Ayu Ari Brahmantariguna
UCAPAN TERIMA KASIH
Puji dan syukur dipanjatkan kehadapan Ida Sang Hyang Widhi Wasa/Tuhan Yang Maha Esa, karena berkat rahmat-Nya penulisan tesis dengan judul “Hubungan Kompetensi Project Manager terhadap Keberhasilan Proyek Konstruksi
Gedung”
ini
dapat
diselesaikan sebagai
pemenuhan syarat
penyelesaian Pendidikan Magister Pascasarjana Teknik Sipil Universitas Udayana. Dalam kesempatan ini penulis ingin mengucapkan terima kasih yang sebesar-besarnya kepada Putu Alit Suthanaya, ST, MEngSc., Ph.D selaku Ketua Program Studi Magister Teknik Sipil, GAP. Candra Dharmayanti, ST., Msc., PhD selaku Sekretarist Program Studi Magister Teknik Sipil dan Pembimbing I, Ir. I Wayan Yansen, MT selaku Pembimbing II, Dr. Ir. Dewa Ketut Sudarsana, MT selaku Penguji I, Ir. Nyoman Martha Jaya, MConstMgt., Ph.D selaku Penguji II dan Ir. Gede Astawa Diputra, MT selaku penguji III, serta Ir. Mayun Nadiasa, MT yang telah memberikan masukkan dan bimbingan untuk penyempurnaan penulisan tesis ini. Terima kasih yang sedalam-dalamnya diucapkan kepada keluarga tercinta, Tuaji, Ibu, Tugus Agung dan Mogek Anom, serta saudara-saudara lainnya yang telah memberikan doa dan dukungan yang tiada henti. Terima kasih diucapkan untuk yang tercinta Ida Bagus Komang Candra Rukmana, ST yang selalu setia menemani disetiap langkah dalam penyelesaian tesis ini, selalu memberikan doa dan semangat serta selalu menjadi tempat untuk berkeluh kesah. Terima kasih juga kepada sahabat-sahabat tersayang, Dewi Yulyastari, ST., Ida Ayu Indah F.W, ST., Putu Nadira, ST., Ida Ayu Praniti, ST., Sintya Rani, ST., Prema Diani, S.Psi., Okta Wahyu, SE serta teman-teman lainnya yang tak dapat disebutkan satu persatu. Dan terima kasih kepada seluruh responden serta pihakpihak lainnya yang telah membantu dalam penelitian tesis ini.
vi
Akhir kata, penulis sangat mengharapkan kritik dan saran untuk penyempurnaan tesis ini, dan semoga tesis ini dapat bermanfaat bagi para pembaca, khususnya untuk mereka yang berperan sebagai manajer proyek.
Denpasar, 5 Agustus 2015
Penulis
vii
ABSTRAK HUBUNGAN KOMPETENSI PROJECT MANAGER TERHADAP KEBERHASILAN PROYEK KONSTRUKSI GEDUNG
Salah satu faktor tercapainya keberhasilan proyek dipengaruhi oleh peran seorang project manager. Untuk mencapai keberhasilan proyek dibutuhkan project manager yang handal, yang mengetahui lingkup tugasnya sebagai seorang pemimpin proyek serta mempunyai persyaratan kompetensi yang dibutuhkan. Kompetensi seorang project manager dapat diukur oleh tiga aspek yaitu knowledge, skill serta attitude. Tujuan dari penelitian ini adalah untuk mengidentifikasi hubungan kompetensi seorang project manager berdasarkan tiga aspek yaitu knowledge, skill dan attitude terhadap keberhasilan proyek. Pengumpulan data dilakukan melalui survei menggunakan kuesioner. Sasaran responden dalam penelitian ini adalah orang-orang yang bepengalaman di bidang jasa konstruksi gedung dan bertindak selaku project manager. Pengolahan data dilakukan dalam tiga tahapan, yaitu analisis faktor untuk mereduksi/meringkas variabel yang berjumlah banyak menjadi beberapa kelompok faktor yang kemudian menjadi variabel bebas yang baru, dilanjutkan ke tahap uji korelasi dengan metode Pearson Correlation untuk mengetahui korelasi antara variabel bebas dengan variabel terikat dan terakhir melakukan analisis regresi linier berganda. Hasil analisis faktor menunjukkan bahwa variabel terbentuk menjadi sebelas kelompok faktor, hasil uji Pearson Correlation menunjukkan bahwa hanya enam kelompok faktor yang berkorelasi terhadap keberhasilan proyek diantaranya adalah: Communication and Scope Management, Human Resource Management yang merupakan bagian dari knowledge; Leadership and Project Management, Profesionalism and Isu Management sebagai bagian dari skill; serta attitude yang menyangkut Tanggung Jawab, Impian dan Prioritas. Keenam kelompok faktor tersebut akan menjadi variabel bebas dalam analisis regresi linier berganda. Dari hasil uji korelasi berganda, enam variabel bebas tersebut secara simultan memberikan pengaruh yang signifikan terhadap keberhasilan proyek, terbukti dari nilai probabilitas yang dihasilkan sebesar 0,032.
Kata kunci : kompetensi, manajer proyek, keberhasilan, konstruksi, gedung.
viii
ABSTRACT THE CORRELATION OF PROJECT MANAGER’S COMPETENCY WITH THE SUCCESS OF BUILDING CONSTRUCTION PROJECT
One of the factor that influences the achievement of a project success is the role of a project manager. A reliable project manager, who knows his duties as a project leader and has the necessary competency requirements is needed to achieve the success of the project. The competence of a project manager can be measured by three aspects: knowledge, skill and attitude. This research aims to analyze the relationship between project manager competencies (that measured by three independent variables, i.e. Knowledge, skills and attitude) and the success of the building construction project. Data was collected through a questionnaire survey. The sample/ respondents were the expertise in the field of building construction services those acts as a project manager. Data was analyzed in three stages: first, factor analysis to reduce the variables into several groups of factors, that called as independent variables; second, correlation test with Pearson Correlation method to determine the correlation between independent variables and dependent variable; lastly, perform multivariate regression analysis The results of factor analysis showed that the variables are formed into eleven groups, and the result of Pearson Correlation test showed only six groups correlated to project success, those are: Communication and Scope Management, Human Resource Management, which is part of knowledge; Leadership and Project Management, Professionalism and Issues Management as part of skill; and attitude concerning Responsibility, Vision and Priorities. The sixth group of these factors will be the independent variables in multivariate regression analysis. Based on multiple correlation test results, six independent variables simultaneously have a significant influence to the project success, proved by the result of probability value is 0,032.
Keywords : competency, project manager, success, constructions, building.
ix
DAFTAR ISI
SAMPUL DALAM ............................................................................................................ i PRASYARAT GELAR ....................................................................................................... ii LEMBAR PENGESAHAN ................................................................................................ iii LEMBAR PENETAPAN PANITIA PENGUJI.................................................................. iv PERNYATAAN BEBAS PLAGIAT .................................................................................. v UCAPAN TERIMA KASIH ............................................................................................... vi ABSTRAK .......................................................................................................................... viii ABSTRACT ........................................................................................................................ ix DAFTAR ISI ....................................................................................................................... x DAFTAR TABEL ............................................................................................................... xiii DAFTAR RUMUS.............................................................................................................. xiv DAFTAR GAMBAR .......................................................................................................... xiv DAFTAR LAMPIRAN ....................................................................................................... xvi
BAB I
BAB II
PENDAHULUAN 1.1
Latar Belakang ....................................................................................... 1
1.2
Rumusan Masalah .................................................................................. 3
1.3
Tujuan Penelitian.................................................................................... 4
1.4
Manfaat Penelitian.................................................................................. 4
1.5
Batasan Penelitian .................................................................................. 5
TINJAUAN PUSTAKA 2.1
Pengertian Project Manager .................................................................. 6
2.2
Peran dan Tanggung Jawab Project Manager ....................................... 7
2.3
Kompetensi Seorang Project Manager .................................................. 14 2.3.1
Knowledge Project Manager ..................................................... 19
x
BAB III
BAB IV
2.3.2
Skill Project Manager ................................................................ 22
2.3.3
Attitude Project Manager .......................................................... 26
2.4
Keberhasilan Proyek .............................................................................. 27
2.5
Konseptual Kerangka Berpikir ............................................................... 32
METODE PENELITIAN 3.1
Kerangka Penelitian ............................................................................... 40
3.2
Jenis Penelitian ....................................................................................... 43
3.3
Jenis Data ............................................................................................... 43
3.4
Sampel dan Responden .......................................................................... 43
3.5
Teknik Pengumpulan Data ..................................................................... 44
3.6
Identifikasi Variabel Penelitian .............................................................. 45
3.7
Metode Pengolahan dan Analisis Data................................................... 48 3.7.1
Pengujian Kuesioner .................................................................. 49
3.7.2
Analisis Deskriptif ..................................................................... 51
3.7.3
Data Cleaning ............................................................................ 51
3.7.4
Analisis Faktor ........................................................................... 52
3.7.5
Uji Asumsi Klasik Regresi Linier Berganda ............................. 53
3.7.6
Analisis Korelasi (Pearson Correlation) ................................... 53
3.7.7
Analisis Regresi Linier Berganda .............................................. 53 3.7.7.1
Analisis Korelasi Berganda/Uji F ............................... 54
3.7.7.2
Analisis Determinasi ................................................... 54
HASIL DAN PEMBAHASAN 4.1
Gambaran Umum Responden ................................................................ 55
4.2
Melakukan Pilot Test Kuesioner ............................................................ 56
4.3
Pengujian Validitas dan Reliabilitas ...................................................... 57
4.4
Analisis Deskriptif.................................................................................. 61
4.5
Pembersihan Data (Data Cleaning) ....................................................... 66
xi
4.6
Analisis Faktor ....................................................................................... 69
4.7
Analisis Hubungan Kompetensi Project Manager terhadap Keberhasilan Proyek............................................................................. 74 4.7.1
Uji Asumsi Klasik Regresi Linier Berganda ............................. 74 4.7.1.1
Uji Normalitas ........................................................... 74
4.7.1.2
Uji Multikolinieritas .................................................. 75
4.7.1.3
Uji Autokorelasi ........................................................ 76
4.7.1.4
Uji Heteroskedastisitas .............................................. 77
4.7.2
Analisis Korelasi (Pearson Correlation) .................................... 78
4.7.3
Analisis RegresI Linier Berganda ............................................... 79 4.7.3.1
Analisis Korelasi BergandaUji F ............................... 82
4.7.3.2
Analisis Determinasi.................................................. 83
4.7.4 Urutan Variabel Yang mempengaruhi Keberhasilan Proyek ......................................................................................... 84
BAB V
KESIMPULAN DAN SARAN 5.1
Kesimpulan............................................................................................. 86
5.2
Saran ....................................................................................................... 87
DAFTAR PUSTAKA ........................................................................................................ 90
xii
DAFTAR TABEL
Tabel 2.1 Jabaran Knowledge Project Manager ................................................................. 33 Tabel 2.2 Variabel Penelitian Unsur Knowledge pada Kompetensi Project Mgr............... 35 Tabel 2.3 Jabaran Skill Project Manager ............................................................................ 35 Tabel 2.4 Variabel Penelitian Unsur Skill pada Kompetensi Project Manager .................. 36 Tabel 2.5 Jabaran Attitude Project Manager ...................................................................... 37 Tabel 2.6 Variabel Penelitian Unsur Attitude pada Kompetensi Project Manager ............ 38 Tabel 3.1 Jabaran Variabel Penelitian ................................................................................. 45 Tabel 3.2 Interprestasi Koefisien Korelasi Nilai r .............................................................. 49 Tabel 4.1 Komposisi Karakteristik Responden ................................................................... 55 Tabel 4.2 Daftarorang sebagai sampel Pilot Test................................................................ 56 Tabel 4.3 Hasil Uji Validitas dan Reliabilitas pada Variabel X1 ....................................... 58 Tabel 4.4 Hasil Uji Validitas dan Reliabilitas Kuesioner ................................................... 59 Tabel 4.5 Analisis Deskriptif Variabel Knowledge............................................................. 61 Tabel 4.6 Analisis Deskriptif Variabel Skill ....................................................................... 63 Tabel 4.7 Analisis Deskriptif Variabel Attitude .................................................................. 64 Tabel 4.8 Analisis Deskriptif Variabel Keberhasilan Proyek ............................................. 65 Tabel 4.9 Hasil Uji KMO dan Barlett’s pada Faktor Knowledge ....................................... 69 Tabel 4.10 Pengelompokkan Faktor pada Knowledge ........................................................ 70 Tabel 4.11 Hasil Uji Normalitas dengan SPSS 16 .............................................................. 75 Tabel 4.12 Hasil Uji Multikolinieritas dengan SPSS 16 ..................................................... 76 Tabel 4.13 Hasil Uji Autokorelasi dengan SPSS 16 ........................................................... 77 Tabel 4.14 Hasil Analisis Regresi dengan SPSS 16 ........................................................... 79 Tabel 4.15 Hasil Uji Korelasi Berganda/Uji F SPSS 16 ..................................................... 83 Tabel 4.16 Urutan Variabel Yang Mempengaruhi Keberhasilan Proyek ........................... 84
xiii
DAFTAR RUMUS
Rumus 3.1 Rumus Uji Validitas Teknik Korelasi Product Moment................................... 49 Rumus 3.2 Rumus Uji Realibilitas Teknik Alpha Cronbach .............................................. 50 Rumus 3.3 Rumus Persamaan Analisis Regresi Berganda ................................................. 53 Rumus 4.1 Rumus Persamaan Analisis Regresi Berganda ................................................. 80
xiv
DAFTAR GAMBAR
Gambar 2.1 Diagram Kerangka Berpikir ............................................................................ 39 Gambar 3.1 Kerangka Penelitian ........................................................................................ 41 Gambar 4.1 Hasil Uji Data Outlier Knowledge .................................................................. 67 Gambar 4.2 Hasil Uji Data Outlier Knowledge .................................................................. 68 Gambar 4.3 Hasil Analisis Faktor Knowledge .................................................................... 71 Gambar 4.4 Hasil Analisis Faktor Skill ............................................................................... 72 Gambar 4.5 Hasil Analisis Faktor Attitude ......................................................................... 73 Gambar 4.6 Grafik Hasil Uji Heteroskedastisitas ............................................................... 78
xv
DAFTAR LAMPIRAN
Lampiran 1 Lembar Kuesioner Penelitian ......................................................................... 94 Lampiran 2 Rekapitulasi Jawaban Responden................................................................... 102 Lampiran 3 Pengujian Validitas dan Reliabilitas Tahap I Variabel Knowledge................ 118 Lampiran 4 Hasil Uji Validitas & Reliabilitas Variabel 46 Responden ............................ 122 Lampiran 5 Hasil Uji Validitas & Reliabilitas, Analisis Deskriptif, dan Data Cleaning Semua Variabel X dan Y ................................................................ 132 Lampiran 6 Hasil Analisis Faktor Knowledge, Skill, dan Attitude..................................... 153 Lampiran 7 Hasil Analisis Regresi Linier Berganda Tahap I ............................................ 161 Lampiran 8 Hasil Uji Pearson Correlation ....................................................................... 166 Lampiran 9 Hasil Analisis Regresi Linier Berganda Tahap II ........................................... 168
xvi