PTK007 SOCIALIZATION Book II – Revision 3 / 2015 Balikpapan, 28 April 2015
EFFECTIVE DATE OF PTK007 REVISION 2015 Revision has made on : • Revision 02 on Book One General Provisions • Revision 03 on Book Two Manual on The Implementation of Goods/ Services Procurement • Decision Letter shall become effective 60 (sixty days) as from the date of its stipulation
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
2
MAIN OBJECTIVE PTK007 REVISION 2015
1. Percepatan & Penyederhanaan Proses Tender Acceleration & Simplification Tender Process
2. Peningkatan Keutamaan Penggunaan Sumber Daya Dalam Negeri Improve Utilization of Local Resources
3. Penerapan Sistem Akuntabilitas Pelaku Pengadaan Barang/Jasa Implementation of Accountability for Procurement Actors
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
3
Percepatan & Penyederhanaan Proses Tender Acceleration & Simplification Tender Process
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
4
TENDER SIMPLIFICATION – SMALL BUSINESS OPPORTUNITY BATASAN NILAI PEKERJAAN (LIMIT OF VALUE OF PROCUREMENT)
SCALE OF VENDORS
REV.3
REV.2
UK (SMALL)
≤ IDR 2.500.000.000 /
≤ IDR 1.000.000.000 /
USD 250,000
USD 100,000
UM (MEDIUM)
≤ IDR 10.000.000.000 /
≤ IDR 2.500.000.000 /
USD 1,000,000
USD 250,000
> IDR 10.000.000.000 /
> IDR 2.500.000.000 /
USD 1,000,000
USD 250,000
UB (LARGE) *
* Untuk calon peserta konsorsium, pemuka konsorsium (leadfirm) harus gol. UB (Large)
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
6
TENDER ANNOUNCEMENT KLASIFIKASI GOLONGAN USAHA (CLASSIFICATION OF ENTERPRISE) refer to following PTK007 articles.
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
7
PROCUREMENT STRATEGY & PARTICIPANTS – ACCELERATION
UB / large
MUS$1
MUS$1
Tender Khusus
Tender Khusus
Tender Khusus UM / m edium
KUS$500
(Rev.2: KUS$50)
KUS$250 UK / sm all
KUS$20
(Rev.2: KUS$5)
PELELANGAN UMUM/TERBATAS
PELELANGAN SEDERHANA
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
PEMILIHAN LANGSUNG
PENUNJUKAN LANGSUNG
8
TENDER WITH SPECIAL PROCUREMENT - ACCELERATION
Proc. Type Specific Activities
Pre-requisite Condition Offshore & Swamp Drilling Rig & associated services, Seismic Services Direct Selection / Direct Appointment Extension contract FSO/FPSO/FPU Direct Appointment Onshore Drilling Rig & associated services, EPC, Rental FSO/FPSO/FPU Limited Tender
Limited Tender
If initial tender fail due to: • Lack participants Direct Selection / Direct Appointment (passed PQ) • Price > OE/ROE invite bidders to submit new price
EOR (Enhanced Oil Recovery - EOR)
Laboratory-test, field test, pilot project in collaboration with national science institution / university Direct Appointment Not required OE (execution refer to approved budget only) Contract EOR applies for multi years
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
9
PROCUREMENT PROCESS - ACCELERATION TENDER PROCESS
LELANG AWAL (Initial Tender)
LELANG ULANG (Re-Tender)
PROSES LANJUTAN *) (Continuation)
Limited Tender
Limited Tender
Open Tender
APDN
Method
Barang Wajib (Mandatory)
Minimum TKDN/LC
15%
5%
0%
APDN
Method
Limited Tender
Open Tender
DS/DA
Barang Non-Wajib
Minimum TKDN/LC
5%
0%
0%
Barang Non-APDN (Non ADP)
Method
Open Tender
Open Tender
DS/DA
Service: Others, Consultancy, Construction
Minimum TKDN/LC
0%
0%
0%
Method
Open Tender
Open Tender
DS/DA
Minimum TKDN/LC
35% or specific condition min 5%
• 30% • 5%
TKDN/LC Preference
All Tender Value
≥ BIDR2.5 or KUS$250
• 15% • 0%
*) if not enough participant, not enough passed TE, not meet OE/ROE PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
10
Peningkatan Keutamaan Penggunaan Sumber Daya Dalam Negeri Improve Utilization of Local Resources
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
11
LOCAL RESOURCES – MAIN POLICIES
Mengutamakan penggunaan barang/jasa Produksi Dalam Negeri Prioritize Local Content (Material / Service)
Mengutamakan keikutsertaan Perusahaan Dalam Negeri Prioritize Participation of Domestic Company
Mengutamakan pelaksanaan jasa di dalam wilayah Indonesia Prioritize Execution of Service in Indonesia PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
12
LOCAL CONTENT – MAIN REFERENTIAL • Tata cara perhitungan TKDN mengikuti ketentuan peraturan UU yang diterbitkan oleh instansi pemerintah yang membidangi industri migas.
Nilai TKDN
• Methodlgy. to calculate TKDN refers to regulation issued by O&G government bodies.
APDN
• Mewajibkan KKKS untuk menggunakan Buku APDN sebagai acuan untuk menetapkan strategi pengadaan serta menetapkan persyaratan pengadaan.
(Barang & Jasa)
• O&G Companies shall use APDN book as reference to define the tender strategy
AML
SNI Preferensi Harga
• Kontraktor KKS dan Penyedia Barang/Jasa harus mengacu Buku APDN dalam penyusunan Approved Manufacturer List (AML). • O&G Companies shall use APDN book as reference to define the AML
• KKKS harus menggunakan SNI untuk barang atau peralatan yang sudah diberlakukan secara wajib oleh instansi pemerintah. • O&G Companies shall use list of Mandatory SNI material issued by Ministry
• Dihitung secara proporsional berdasarkan komitmen pencapaian TKDN disesuaikan dengan peta jalur (roadmap) pencapaian target TKDN. • Proportionally calculated based on TKDN commitment and roadmap TKDN target.
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
13
EXCEPTIONS TO LOCAL RESOUCES = IMPORTATION
Quality
Capacity
- NO QUAL/SPEC MEETS THE NEED - IF PRODUCT, SHALL BE TESTED - APPROVED BY TECH FUNC SKKM
- NOT ENOUGH BASED ON TENDER - PROVEN BY INDEPENDENT SURVEY - ASSOCIATION REPORT / APDN
Time
Price
- NOT AVAILABLE BASED ON TENDER - PROVEN BY MARKET SURVEY
- NEGOTIATED PRICE STILL ABOVE OE / REVISED OE
WITH PROFESSIONAL EVIDENCE/CALCULATION
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
14
DEFINITION OF DOMESTIC COMPONENTS
Material fabrication partly or fully performed in Indonesia
Completion of work partly or fully performed in Indonesia PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
15
ORIGIN OF EQUIPMENT & PERCENTAGE LOCAL CONTENT
(ownership)
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
16
EMPOWERING TKDN – TARGET PERMEN ESDM NO 15 / 2013 (ROADMAPS)
- Defined into short-medium-long term period as weighting factors for TKDN preference PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
17
CONSORTIUM MEMBERS – PRIORITY ON DOMESTIC Options for Consortium in PTK007 Book II Rev.3 : Perusahaan Dalam Negeri - Perusahaan Dalam Negeri (Domestic – Domestic) Perusahaan Dalam Negeri Leadfirm - Perusahaan Nasional (Domestic – National) Perusahaan Dalam Negeri Leadfirm - Perusahaan Asing (Domestic – Foreign) Perusahaan Dalam Negeri Leadfirm - Perusahaan Nasional – Perusahaan Asing (Domestic – National - Foreign) Perusahaan Dalam Negeri non-Leadfirm - Perusahaan Nasional (Domestic – National) Perusahaan Dalam Negeri non-Leadfirm - Perusahaan Nasional – Perusahaan Asing (Domestic – National - Foreign)
- At least one Domestic is member of Consortium; Leadfirm only for Domestic or National - Variation of TKDN preference calculation will depend on partnership composition of consortium PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
18
CURRENCY ON TENDER / CONTRACT
Enlarge circulation of Indonesia currency: Maximize utilization of Indonesian Rupiah for business transaction Procurement for material/service which are sourced locally will be in IDR Tender with relatively high LC will be in IDR, but it depends on the national capacity, capability and/or type of commodities
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
19
Penerapan Sistem Akuntabilitas Pelaku Pengadaan Barang/Jasa Implementation of Accountability for Procurement Actors
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
20
NEW PARADIGM ON ACCOUNTABILITY
Right
• Market not reflecting real competition • Price not follow ideal market conditions • Negative public perception to SCM environment
Contract shall stipulate willingness of contractor to be audited in compliance to UU Tindak Pidana Korupsi, FCPA, ABC
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
• Market shows healthy competition • Price become competitive and efficient • More positive public perception on parties involve in SCM activities
21
AUDITOR TIPIKOR REFERENCE IN PTK007 - 2015 BAB VIII Dokumen Pemilihan PBJ Hal. 71
2.4 Dokumen pendukung kualifikasi ....: 2.4.1 Surat Pernyataan di ttd Pimpinan Tertinggi ...: 2.4.1.7. Kesediaan untuk dilakukan pemeriksaan kepatuhan terhadap Undang-Undang Tindak Pidana Korupsi, Foreign
Corrupt Practices Act (FCPA), dan/atau AntiBribery and Corruption
(ABC) oleh auditor independen yang ditunjuk oleh KKKS dan/atau SKK Migas, berdasarkan data hardcopy dan data digital
PRE
Bab XII Kontrak Hal. 195
2. Isi Kontrak 2.27 Ketentuan mengenai hak KKKS dan SKK Migas atau auditor independen yang ditunjuk oleh KKKS dan/atau SKK Migas untuk melakukan pemeriksaan terhadap pelaksanaan Kontrak termasuk kepatuhan terhadap Undang-Undang Tindak Pidana Korupsi, Foreign
Corrupt Practices Act (FCPA), dan/atau AntiBribery and Corruption
(ABC) kepada perusahaan Pelaksana Kontrak. Pelaksana Kontrak wajib menyampaikan data hardcopy dan data digital kepada auditor independen yang ditunjuk oleh KKKS dan/atau SKK Migas.
CURRENT
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
BAB XIII Penilaian Kinerja Hal. 206
2. Pengawasan 2.1 Pengawasan terhadap pelaksanaan Pengadaan Barang/Jasa termasuk kepatuhan terhadap Undang-Undang Tindak Pidana Korupsi, Foreign
Corrupt Practices Act (FCPA), dan/atau AntiBribery and Corruption
(ABC) kepada KKKS berdasarkan data hardcopy dan data digital. Pengawasan ini dapat dilakukan secara pre, current dan post audit: 2.1.1 Pengawasan internal: KKKS dan/atau SKK Migas atau auditor yang ditunjuk SKK Migas, dan 2.1.2 Pengawasan eksternal: auditor pemerintah dan eksternal lainnya
BAB XIV Pengelolaan PBJ Hal. 214
5.3 Kategori Hitam 5.3.2 Siapapun yang untuk dan atas nama Penyedia Barang/Jasa terbukti melakukan tindakan perbuatan penyuapan kepada pekerja KKKS atau melakukan perbuatan kolusi dan/atau nepotisme kepada pekerja KKKS berdasarkan hasil pemeriksaan auditor atau fungsi internal lain di KKKS.
POST
22
ADMINISTRATIVE SANCTION - OBJECTIVE Administrative sanction is applied to supplier/contractor as a LESSON
for
IMPROVEMENT , not a PUNISHMENT New in PTK007 Book II Rev. 3 : The purpose is for continuous improvement Applied only to Company (except to relevant personnel for the case of violation to UU Tipikor/FPCA/ABC – condition Black Sanction) Limited period With specific probation period For consortium, common sanction applied to all consortium’s member(s)
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
23
ADMINISTRATIVE SANCTION - COMPARISON • PTK007 – revision 2 Type
Format
Period
Entity
Application
Yellow
Warning Letter
6 months
Relevant company
TEPI
Red
Prohibition to participate
1 year
Relevant company
TEPI
Black
Prohibition to participate
1 year
Owner and companies owned by owner
KKKS
• PTK007 – revision 3 Type
Format
Period
Entity
Application
Yellow 1
Warning Letter
6 months
Relevant company
TEPI
Yellow 2
Probation violation lead to RED
6 months
Relevant company
TEPI
Red 1
Prohibition to participate
1 year
Relevant company
TEPI
Red 2
Probation violation lead to BLACK
1 year
Relevant company
TEPI
Black 1
Prohibition to participate
2 years
Relevant company
TEPI
Prohibition to participate
3 years
Relevant individual (violation to ABC / data manipulation)
All KKKS *)
Probation violation expand the application to all KKKS and multiply period of sanction
Multiply by 1 year
Relevant company / individual
All KKKS *)
Black 2
*) Black Sanction will be consulted and approved by SKKM then published in SKKM website PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
24
Ketentuan dan Aturan baru lainnya Other new provisions and rules
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
25
MAIN CHANGES ON PTK007 REV. 2015 - CLASSIFICATION BIDANG & SUB BIDANG (Business Sector / Sub Sector) More specific than Rev.2. Examples below.
MATERIAL
REVISION 3 PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
REVISION 2 26
MAIN CHANGES ON PTK007 REV. 2015 - CLASSIFICATION SERVICE
REVISION 3
REVISION 2
- Contractor / Supplier shall immediately update the status in proccom website : https://proccom.total.co.id/ PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
27
MAIN CHANGES ON PTK007 REV. 2015 – DOC SKTPM/DPM No.
DOCUMENT
HARDCOPY (Original)
SOFTCOPY (via Proccom Website)
1
PQ-01 Statement (incl. Agreement for independent auditing)
Yes
No
2
HSE Statement
Yes
No
3
E-Procurement Participation Form
Yes
No
4
E-Sourcing Participant Agreement Form
Yes
No
5
Due Diligence Questionnaire
Yes
No
6
Statement of Domestic Company Status
Yes
Yes
7
Deed of Establishment and valid amendment (if any)
No
Yes
8
Certificate of Domicile
No
Yes
9
SIUP / SIUJK / IUT/ SIUPAL / SIOPSUS
No
Yes
10
Valid TDP (within 5 years)
No
Yes
11
SKT Migas (mandatory for UB; UK/UM upon request)
No
Yes
12
STP / Partnering Agreement / Agency Letter
No
Yes
13
Tax Payment Certificate: • SPPKP (Surat Pengukuhan Pengusaha Kena Pajak)
No
Yes
• NPWP
No
Yes
• SPT (Surat Pemberitahuan – Form 1771, )
No
Yes
• Tax Receipt (Bukti Setoran Pajak)
No
Yes
14
Financial Report (for TEPI internal analysis)
No
Yes
15
PO/SO/Contract and proof completion from client (except Agent)
No
Yes
: Annual update starts July
: regular update at proccom website
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
28
MAIN CHANGES ON PTK007 REV. 2015 – DOC SKTPM/DPM
SKT MIGAS on PREQUALIFICATION: • Applicable for Large Enterprise (UB – Usaha Besar) and/or other classification (UK / UM) if tender requires custom clearance for the equip/ material. • Other government reference : Letter of the Director General of Oil and Gas (Dirjen Migas) No. 111/DJ/MIGAS/1974 dated 13 April 1974 jo . No. 7523 / 29.06 / DJM.B / 2003 dated 31 December 2003 regulates “the requirement for companies engaged in oil and gas industry to register their company data”. • SKT is mandatory document for custom clearance application (Master List)
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
29
MAIN CHANGES ON PTK007 REV. 2015 – BONDS
BID BOND : • Shall be provided for open tender, limited tender, simple tender and direct selection with estimate tender value > BIDR 2.5 or KUS$250. (Rev.2 limit is MIDR500 / KUS$50). • Liquidation will be exercised due to bid cancellation, decline participation, and/or post bidding. • Bidder refusal to extend the bid bond will lead to disqualification.
PERFORMANCE BOND : • Shall be provided for contract value > BIDR 1 or KUS$100. (Rev.2 limit is MIDR500 / KUS$50) • When bid value < 80% HPS/OE, PB amount is 5% of HPS/OE. (Rev.2 is 5% of 80% OE)
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
30
MAIN CHANGES ON PTK007 REV. 2015 – TKDN REALIZATION
TKDN MONITORING: • Reference : Permen 15 ESDM no. 15 / 2013 concerning “Utilization local product on oil & gas upstream activities” including TKDN target roadmaps & monitoring • Monitoring, Article 7
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
31
MAIN CHANGES ON PTK007 REV. 2015 – TKDN REALIZATION TKDN MONITORING: • Threshold and entity in-charge for verification, Article 17
certified
• Download on ESDM website: http://www.esdm.go.id/regulasi/permen/cat_view/64-regulasi/70-peraturanmenteri/276-peraturan-menteri-esdm/378-tahun-2013.html
- Contractor should calculate and state the TKDN in professional manner PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
32
MAIN CHANGES ON PTK007 REV. 2015 – TKDN REALIZATION Obligation on TKDN Service Verification – Threshold and Entity to Perform ≥ 30% Nilai Tender (Rp.)
< 30%
Kompleksitas Tinggi
Kompleksitas Rendah
Kompleksitas Tinggi
Kompleksitas Rendah
≥ 1 Triliun
Independen *)
Vendor
Independen (≥ 5%) / Vendor (< 5%)
Vendor
200 M – 1 T
Independen *)
Vendor
Independen (≥ 15%) / Vendor (< 15%)
Vendor
50 M – 200 M
Independen *)
Vendor
Vendor
Vendor
5 M – 50 M
KKKS
Vendor
Vendor
Vendor
2,5 M – 5M
Vendor
Vendor
Vendor
Vendor
<2,5 M
NA
NA
NA
NA
*) Current potential company : Sucofindo & Surveyor Indonesia Note: If performed by vendor, shall be verified by CERTIFIED inspector (by DJMigas)
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
33
MAIN CHANGES ON PTK007 REV. 2015 SIMPLE TENDER: New tender strategy with following pre-requisites: • • • • • • • •
Tender value ≤ BIDR 5 / KUS$500 Submission document in one envelope or two envelopes No qualification process participants passed criteria as tender announcement No pre-bid spec should be considered clear No protest period any protest will not be responded No simultaneous negotiation fail if not meet OE at stage negotiation Objection only one time after winner announcement Tender value allowed > BIDR 5 / KUS$500 for : consumables with low risk impact to operation /non critical maintenance service having SOP (manufacture or TEPI)
LOCATION PROCUREMENT • Procurement process of material/service as support to production/operation facilities shall be conducted at KKKS’s main operation region/province • Tender value threshold ≤ IBDR 5 / KUS$ 500. (Rev.2 : IBDR 2 / KUS$ 200)
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
34
MAIN CHANGES ON PTK007 REV. 2015 – ORDER ACCEPTANCE FOO ACCEPTANCE: • Relevant article in PTK007 : Book II Chapter XI Article 16.1 16.1. ……. Peserta Tender yang ditunjuk sebagai pemenang wajib menerima penunjukan tersebut dalam waktu tiga hari kerja terhitung setelah tanggal surat penunjukan pemenang Tender. ….. appointed tender winner shall accept the FOO within three working days from the date of FOO issuance …. (Rev.2 : five working days) • Fail to respond will refer to RED Sanction clause : Book II Chapter XIV Article 5.2.4 5.2.4. Menolak memasok barang atau melaksanakan pekerjaan setelah ditunjuk sebagai pemenang Tender/pelaksana Kontrak. … refuse to supply the goods or render the service after being appointed as tender winner …
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
35
DISCLAIMER
Materi presentasi ini disusun dengan tujuan untuk mempermudah pemahaman. Apabila terdapat keputusan yang berdampak hukum maka yang berlaku adalah materi yang tercantum pada buku pedoman Nomor PTK-007/SKKO0000/2015/S0 Buku Kesatu Revisi02 dan Buku Kedua Revisi 03.
... end of presentation PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
ISSUANCE OF SIUP/SIUJK/IUT
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
40
KLASIFIKASI USAHA JASA PELAKSANA KONSTRUKSI No.
Kualifikasi
Sub Kualifikasi
Batasan Nilai Satu Pekerjaan
1
Orang Perorangan
P
Max. Rp 300 juta
2
Usaha Kecil
K1
Max. Rp 1 miliar
3
K2
Max. Rp 1.75 miliar
4
K3
Max. Rp 2.5 miliar
M1
Max. Rp 10 miliar
M2
Max. Rp 50 miliar
B1
Max. Rp 250 miliar
B2
Tak terbatas
5
Usaha Menengah
6 7
Usaha Besar
8
Referensi: Peraturan LPJK No. 10 Tahun 2014 tentang Perubahan Kedua Atas Peraturan lembaga Pengembangan Jasa Konstruksi Nasional No. 10 Tahun 2013 Tentang Registrasi Usaha Jasa Pelaksana Konstruksi – Lampiran 2
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
41
KLASIFIKASI USAHA JASA PERENCANA DAN PENGAWAS KONSTRUKSI
No.
Kualifikasi
Sub Kualifikasi
Batasan Nilai Satu Pekerjaan
1
Orang Perorangan
P
Max. Rp 250 juta
2
Usaha Kecil
K1
Max Rp. 500 juta
K2
Max Rp. 750 juta
M1
Max. Rp 1,5 miliar
M2
Max. Rp 2,5 miliar
B
Tak terhingga
3 4
Usaha Menengah
5 6
Usaha Besar
Referensi: Peraturan LPJK No. 11 Tahun 2013 tentang Registrasi Usaha Jasa Perencana dan Pengawas Konstruksi – Lampiran 2
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
42
SUBMISSION BID DOCUMENTS
ATTENTION ZERO TOLERANCE Please ensure: 1. Submit document in time (closing at 14.00 WITA / 15.00 WIB) 2. Highlight remarks for each document type (ORIGINAL/COPY) 3. Letter of Bid Submission : signature date shall be the same with closing date.
!! Closing date extension !! 4. Bid Bond validity ≥ Bid validity : calculated from closing date (All CFT and DS > BIDR2.5/KUS$250)
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
45
PROTEST
OBJECTION
• Protest shall be an objection of Goods/Services Providers filed by no later than 3 (three) working days prior to the last day of the period for the submission of bids.
• Objection for Technical, Commercial Evaluation and Winner announcement shall be submitted at the latest 3 (three) working days after the announcement date.
• Protests MUST be submitted via Fax or Post Mail (e-mail or any other media is not accepted).
• Any objection submitted after the objection period, will not be accounted.
• Protest may only be filed against:
• Objection MUST be submitted via Fax or Post Mail (e-mail or any other media is not accepted).
a. Deviations in the content of the document and tender process related to the terms and conditions of goods/services procurement and/or applicable laws and regulations. b. Requirements, criteria, or procedures of procurement which lead to 1 (one) Goods/Services Provider or a certain type of product. c. The practices of corruption, collusion and nepotism (KKN) between Tender participants and member(s) of the Procurement Committee/Internal Team and/or Authorized Official.
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
• Objection will be responded at the latest 5 (five) working days after the objection letter is received. • The appeal-objection (for winner announcement) may be filed by supplier no later than 3 (three) working days as of the date on which the response to the objection is sent. And must be sent also to SKK Migas. • The appeal-objection collateral shall be set at 1 ‰ (permil) of the total value of the protester’s price bid and a maximum of Rp.50,000,000.00 (fifty million Rupiah).
46
BASIC CAPABILITY (KD) & HIGHEST EXPERIENCE (NPT) Basic Capability (KD) Type of Tender
Revision 3
Revision 2
80% - 110% $Tender
Equal $Tender
Mtri / Svc >12 mth 5 yr
80% - 110% Avg. 12m $Tender
Equal Avg. 12m $Tender
Mtrl / Svc > 5 yr
80% - 110% Avg. 5year $Tender
Equal Avg. 5year $Tender
Lump sum ≤ 12 mth
Highest Experience Value (NPt) Type of Commodity
Revision 3
Revision 2
Construction
1/3 KD
1/5 KD
Mtrl, Other Service, Consultancy
1/5 KD
1/5 KD
---
1/2 KD
Cumulative NPt members
Cumulative KD members
Contracting (Pemborongan) Consortium
Defintion NPt by period Period Tender
Revision 3
Revision 2
Duration ≤ 12 mth
Completed Single Contract Value
Single Contract Value
Duration > 12 mth
Cumulative in 12 mth
Cumulative 1 Jan – 31 Dec
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
48
BONDS (JAMINAN)
TYPE
VALUE
WHEN TO SUBMIT?
Bid Bond (Jaminan Pengadaan)
From Bid Offer Value (penawaran): • National Company: 1%-3% • Domestic Company: 0.5%
Bid Submission : Commercial Document
Performance Bond (Jaminan Pelaksanaan)
5% - 10% from contract value
At the latest 10 days after issuance of FOO
Down Payment Bond (Jaminan uang Muka)
≥ down payment value
At the latest 10 days after down payment request is approved
Maintenance Bond (Jaminan Pemeliharaan )
5% - 10% from contract value
Before entering maintenance period
• Issued by State Owned Bank (BUMN or BUMD Bank) • If not possible, National Bank is allowed (term and condition applied) PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
ORIGIN OF EQUIPMENT & PERCENTAGE LOCAL CONTENT Equipment Origin
(ownership)
(ownership)
(domestic)
local
(national / foreign)
(domestic)
abroad
(national / foreign)
PTK 007 Socialization to Contractor – Balikpapan, 28 April 2015
50