DAFTAR REFERENSI
Ahmad Radzi, Ahmad Safuan Bin. (2005). The Study of Causes and Effects of Change Order to Engineering Consultant Practitioners. Master Theses Universiti Teknologi Malaysia. Al-Muhammadi, Faisal H., & Al-Harthi, Majed H. (n.d.). Change Order. ABX College of Environmental Design Department of Construction Engineering & Management. Assaf, Sadi A. & Al-Hejji, Sadiq. (2006). Cause of Delay in Large Construction Projects. International Journal of Project Management, 24, 4, 349. Azwar, Saifuddin. (1997). Reliabilitas dan Validitas. Yogjakarta: Pustaka Pelajar. Baldwin, Andrew N., & Austin, Simon A. (2007). Reducing Waste in High-rise Residential Building by Information Modelling at Design Stage. Journal of Surveying and Building Environtment, 18, 1, 51-62. Barrie, Donald S., & Paulson, Boyd C. (1992). Proffesional Construction Management Third Edition. Singapore: Mc Graw-Hill. Boutwell, Scott. (2008). How BIM and Green Tech Will Change The Construction Industry. Kiplinger Business Resouces Center. May 30, 2009. http://www.GreenBiz.com. Building Construction. (2009). In Encyclopedia Britannica. May 30, 2009. http://www.britannica.com. Callahan, Michael T. (2005). Construction Change Order Claims Second Edition. NY: Aspen Publisher Inc. Canada Mortgage and Housing Corporation (CMHC)’s Research. Healthy Highrise : A Guide to Innovation in The Design and Construction of High-rise Buildings, 02-101. Ontario: Reseach Highlights. Chase, Nancy. (1999). Quicker Engineering Change Order Approvals. Journal of Quality, 38, 47. Chao-hui, Wu, Hsieh, Ting-ya & Cheng, We-Ion. (2005). Statistical Analysis of Causes for Design Change in Highway Construction in Taiwan. International Journal of Project Management, 23, 7, 554. CIB-Wold Congress. (2004). High-rise Building, Analysis of Constraints to Innovation. Toronto.
134
Universitas Indonesia
Pengendalian change..., Wahyuni Nurhadiyati, FT UI, 2010.
135
Clough, Richard H., Scars, Glem A., & Scars, S. Kedla. (2000). Construction Project Management Fourth Edition. New York: John Wiley & Sons Inc. Construction Change Order Prosedure Guideline. (2006). Davies, Tom. (2008, May). Change Orders – Managing Construction Change and Claims. Paper presented at ABC – National Construction Education Conference. Dellon, Alfred L., & Dellon, Irene J. (1988). Documentation and Verification in The Change Order Process. Journal of American Association of Cost Engineers Transactions of The American Association, C.7.1. Dewi, Dharu, Joyosukarto, Priyanto M. & Rijanti, Arum Puni. (2006). Studi Sistem Pengendalian Proyek Konstruksi PLTN di Indonesia: Faktor-Faktor Penghambat dan Pendukung. Prosiding Seminar Nasional ke-12 Teknologi dan Keselamatan PLTN Serta Fasilitas Nuklir. Dhabi, Abu & Kristiawan (2006). Perubahan Lingkup Pekerjaan. Transferring Export Knowledge Migas Indonesia. Dinariana, Dwi. (2001). Pengaruh Perubahan-Perubahan yang Terjadi Pada Tahap Pelaksanaan Terhadap Kinerja Biaya Proyek Konstruksi di Lingkungan Bank BNI. Depok: Master Tesis Manajemen Proyek Universitas Indonesia. Douglas III, Edward E. (2003). Effective Management of Project Change Orders. Journal of AACE International Transactions, PM111. Doyle, Jacqueline T., Molnar, Michael & Brown, Robert B. (2008). Lesson Learned on Reducing Change Orders. Journal AACE International Transactions, OW21. Educational Program Innovations Center (EPIC). (2008). Planning Construction Equiptment and Methods for Reducing Cost of High-rise Buildings. Mississauga : EPIC Learning Centre. El-Razek, M.E. Abd, Bassioni, H.A. & Mobarak, A.M. (2008). Causes of Delay in Building Construction Project in Egypt. Journal of Construction Engineering and Management, 134, 11. Engineering and Physical Science Research Council (EPSRC). Industrial Report : Managing Changes in Construction Project. London : University of West of England. Fisk, Edward R. & Reynold, Wayne D. (2006). Construction Project Administration Eight Edition. New Jersey: Pentice Hall Inc.
Universitas Indonesia Pengendalian change..., Wahyuni Nurhadiyati, FT UI, 2010.
136
Furqon. (2008).Statistika Terapan Untuk Penelitian. Bandung: Penerbit Alfabeta. Gilberth, Robert D. (1992). Managing Construction Contract Operational Control for Commercial Risk Second Edition. New York: John Wiley & Sons Inc. Goldhaber, Stanley, Jha, Candra K., & Macebo, Manuel C. (1977). Construction Management Principles & Practices. New York: John Wiley & Sons Inc. Greater Toronto Electrical Contractors Association. (2001). Change Order Users Guide. Ontario: Author. Harmon, Kathleen & Stephan, Bruce M. (2001). Claims Avoidance Technique : Best Practices for Contract Administration. Journal AACE International Transactions, CD11. Hassanein, Amr A.G., Nemr, Waleed El. (2008). Claims Management in The Egyptian Industrial Construction Sector : A Contractor’s Perspective. Journal of Engineering, Construction and Architectureal Management, 15, 5, 456. Henry. (2005). Metoda Estimasi Waktu Penyelesaian Konstruksi Bangunan Gedung. Bandung: Master Theses Departemen of Civil Engineering ITB. Iskandar. (2008). Perilaku Terhadap Proyek Yang Bermasalah. Project Management. Jauregui, Luis. (2009). The Architect’s Role Throughout Construction. Journal of Residential Design & Build, 74, 8. Joint Legislative Committee on Performance Evaluation and Expenditure Review (PEER Committee). (2002). The Bureau of Building’s Management of Construction Change Order. Mississippi. Jordan. Daniel W. (1989). Manage Change: Making The Most of Contingency. Journal of American Association of Cost Engineers Transactions of The American Associations, Q.1.1. Kadir, M. R. Abdul, et al. (2005). Factors Affecting Construction Labour Productivity for Malaysian Residential Projects. Journal Structural Survey, 23, 1, 42. Kentucky Transportation Cabinet. (2006). Change Order Process Plan. Kettlewell, Frank. (2003). Proactive Change Order Management. Journal of AACE International Transactions, CD161. Koning, Thomas L. & Pratt, L. Vincent Jr. (2007). Commissioning Repetitive Floor in a High-rise Office Building. National Conference on Building Commissioning.
Universitas Indonesia Pengendalian change..., Wahyuni Nurhadiyati, FT UI, 2010.
137
Levy, Sidney M. (2006). Project Management in Construction Fifth Edition. New York : McGraw Hill. Manzo, Frank A.(1997). The Impact of An Unbalanced Bid on The Change Order Process. North America: Greyhawk North America LLC. McCally, Bob M. (1997). Change Order Management. Journal of AACE International Transactions, 65. Mendes, Ricardo & Heineck, Luis Fernando M. (1999). Towards Production Control on Multi-Story Building Construction Sites. USA : University of California. Mullin, Kim. (2007, June). Change to Construction Plans? Building Permits Can Be Revoked. WeirFoulds LLP. May 30, 2009. http://www.WeirFoulds.com. Nadel, Barbara. (2009, January). High-rise International Building Code Changes Reflect Lessons Learned from 9/11. New York : Door and Hardware Institute. May 30, 2009. http://www.thefreelibrary.com/bussiness and industry/construction and material industries. National Safety Council. (n.d.). Evacuation System for High-rise Buildings. Neuman, W. Lawrence. (1994). Social Research Methods Qualitative & Quantitative Approaches Second Edition. New York: Mc Graw-Hill. Nunnaly, S.W. (1993). Construction Methods & Management Third Edition. New Jersey: Pentice Hall. O’Brien, J.J., & Zilly. (1991). Contractor’s Management Handbook. New York: Mc Graw-Hill. O’Leary, Arthur. (2009). Coping With Change Orders : Keeping Confusion Under Control and Limiting Dispute. Design Cost Data (DCD). Othman, Ayman A. E., Hassan, Tarek M., & Pasquire, Christine L. (2004). Drivers for Dynamic Brief Development in Construction. Journal of Engineering, Construction and Architectural Management, 11, 248. Padalka, Alex. (2008). High-rise Residential Construction Keeps Going. New York: Mc Graw-Hill. Pangihutan, Sahala. (1998). Pengaruh Pengendalian Perubahan Lingkup Kerja Pada Kinerja Pelaksanaan Proyek Konstruksi Bangunan Bertingkat di Jakarta. Depok: Master Tesis Manajemen Proyek Universitas Indonesia. Peraturan Menteri Pekerjaan Umum Nomor 29 Tahun 2006 Tentang Pedoman Persyaratan Teknis Bangunan Gedung.
Universitas Indonesia Pengendalian change..., Wahyuni Nurhadiyati, FT UI, 2010.
138
Pooja, Mechanda. (2005). A Framework for Reducing Change Order Processing Time in University Construction Projects. Journal Michigan State University, 239. Popescu, Calin M. (1986). Construction Project: Change Order Management. Journal of American Association of Cost Engineers Transactions of The American Associations,J.2.1. PMI. (2004). A Guide To The Project Management Body of Knowledge (PMBOK) Third Edition. USA: Project Management Institute Inc. Reiner, Laurence E. (1972). Handbook of Construction Management. New Jersey: Pentice Hall Inc. Sanders, Mark C. (2004). Systematic Contract Change Review. Journal AACE International Transactions, PM191. Saunders, Mark, Lewis, Philip & Thornhill, Adrian. (2003). Research Methods for Bussiness Students. England : Prentice Hall. Sarvi, Hamid. (1992). Overhead and Profit on Change Order. Journal of Civil Engineering, 62,8. Schexnayder, Clifford J., & Mayo, Richard E. (2004). Construction Management Fundamentals. Singapore: Mc Graw-Hill. Smoot, Bob. (n.d.). A/E and Construction Change Order Estimating. Soeharto, Imam. (1995). Manajemen Proyek Dari Konseptual Sampai Operasional. Jakarta: Penerbit Erlangga. Stockenberg, Richard A. (2001). Change Order: An Unhappy Necessity. Journal of Building Design & Construction, 42, 41. Sudarmanto, R. Gunawan. (2005). Analisis Regresi Linier Ganda Dengan SPSS. Yogyakarta: Penerbit Graha Ilmu. Sugiyono. (2007). Metode Penelitian Kuantitatif Kualitatif dan R&D. Bandung: Penerbit Alfabeta. Sunyoto, Danang. (2009). Analisis Regresi Dan Uji Hipotesa. Yogyakarta: MedPress. Suhanic, George. (1980). Change Order Impact on Construction Cost and Schedule. Journal of American Association of Cost Engineers Transactions of The American Associations, F.3.1.
Universitas Indonesia Pengendalian change..., Wahyuni Nurhadiyati, FT UI, 2010.
139
Sweis, G., Sweis, R., Hammad, A. Abu & Shboul, A. (2008). Delays in Construction Project : The Case Jordan. International Journal of Project Management, 26, 6, 665. The Delaware ABC Partnering Committee. (2006). Prevailing Wage Rate Construction Change Order. The Las Vegas-Clark County Library District Board of Trustees. (2007). Construction/Renovation Project Change Order Approval Policy and Procedures. The Office of the City Auditor (OCA). (2006). Project Change Order Review. Ullman, David G. (2009). The Mechanical Design Process Fourth Edition. New York:Mc Graw Hill. Undang-undang Republik Indonesia Nomor 28 Tahun 2002 Tentang Bangunan Gedung. Utomo, Howard. (2003). Pengaruh Tingkat Penyebab Change Orders Pada Kinerja Waktu Pelaksanaan Proyek Konstruksi Bangunan Bertingkat di Jabotabek. Depok: Master Tesis Manajemen Proyek Universitas Indonesia. Uyanto, Stanislaus S. (2009). Pedoman Analisis Data dengan SPSS. Yogyakarta : Penerbit Graha Ilmu. Werderitsch, Anthony J., & Krebs, James E. (2002). Constructive Changes. Journal of AACE International Transactions, CD71. WSDOT. (2008). A Guide to The WSDOT Construction Change Order Process. Yin, Robert K. (2002). Studi Kasus Desain dan Metode. Jakarta: PT Rajagrafindo Persada. Zacky, Muhammad. (2001). Pengaruh Kualitas Manajemen Proyek Terhadap Kinerja Waktu Pelaksanaan Proyek Konstruksi Bangunan Bertingkat Di Jabotabek. Depok: Master Tesis Manajemen Proyek Universitas Indonesia.
Universitas Indonesia Pengendalian change..., Wahyuni Nurhadiyati, FT UI, 2010.